RecordWell Data

County Council Meeting — Agenda Packet

Beaufort County · Beaufort County · County Council Meeting · meeting of Oct 12, 2026 · Agenda packets

Open the original document More from Beaufort County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

County Council Meeting Beaufort County, SC Council Chambers, Administration Building Beaufort County Government Robert Smalls Complex 100 Ribaut Road, Beaufort Monday, October 12, 2026 6:00 PM AGENDA COUNCIL MEMBERS: Alice Howard, Chair David P. Bartholomew Logan Cunningham York Glover Lawrence McElynn Thomas Reitz Anna Maria Tabernik, Vice-Chair Paula Brown Gerald Dawson Mark Lawson Joseph Passiment 1. CALL TO ORDER: Alice Howard, Chair 2. PLEDGE OF ALLEGIANCE AND INVOCATION: Gerald Dawson, Council Member 3. STATEMENT OF COMPLIANCE WITH FOIA: Alice Howard, Chair 4. APPROVAL OF AGENDA 5. APPROVAL OF MINUTES a. Minutes from Caucus and County Council September 14, 2026. 6. PROCLAMATION a. Proclamation recognizing the Week of October 18–24 as National Friends of Libraries Week. b. Proclamation recognizing Kraig Gordon. 7. ADMINISTRATOR'S REPORT 8. PUBLIC COMMENT PERIOD - 30 MINUTES TOTAL 9. LIAISON AND COMMITTEE REPORTS ● Community Services Committee ● Natural Resources Committee ● Finance, Administration, and Economic Development Committee ● Public Facilities Committee Page 1 of 332 10. APPROVAL OF CONSENT AGENDA CONSENT AGENDA a. Items Originating from the Public Facilities and Safety Committee 1. Approval of task order to Collins Engineers, Inc for the design of improvements and expansion of the Eddings Point Boat Landing ($233,912.80) (Pending A&H Tax awards on 9/14/26) 2. Approval of a change order to MAJ Enterprises, Inc. for the Shell Point Traffic Calming Project ($53,592.09) 3. Recommendation to Award a contract to Apac Atlantic, Inc for the Sunset Blvd / Miller Drive roadway resurfacing and traffic calming project ($739,873.48) 4. Approval of a Task Order to HDR Engineering, Inc for the Preliminary Engineering for Alterations to the Chowan Creek Bridge Approaches ($212,630) 5. Omnia contract award for St. Helena Island Library LED retrofit ($200,000). 6. Recommendation for approval of a change order with Kimley Horn for a Phase 2 Environmental Site Assessment (ESA) on the Ladys Island Drive Turn Lane at Ribaut Road Project ($42,350) END OF CONSENT AGENDA 11. ORDINANCES FOR THIRD READING: a. 2026/43: An ordinance to amend Ordinance 2026/29 to authorize the transfer of funds. The vote at the Finance, Administration, and Economic Development Committee on August 17, 2026 - 9:0 The vote at First Reading on September 14, 2026 - 9:1 The vote at Second Reading and Public Hearing September 28, 2026 - 6:4 b. 2026/44: An Ordinance Amending the FY2027 Budget for Stormwater Utility Operations, Carryover Purchase Orders, Accommodations & Hospitality Tax projects, and Facility Operations. The vote at Finance, Administration, and Economic Development Committee Meeting on August 17, 2026 - 9:0 The vote at First Reading on September 14, 2026 - 10:0 The vote at Second Reading and Public Hearing on September 28, 2026 - 10:0 c. 2026/45: An Ordinance Authorizing the County Administrator to Execute the Necessary Documents and Provide Funding for the Purchase of Real Property Identified as TMS Nos. R200-010-000- 0340-0000, R200-010-000-021G-0000, and R200-010-000-0446-0000 from Brickyard Commons, LLC for the Royal Pines Stormwater Project in the amount of $3,475,000. The vote at the Finance, Administration, and Economic Development Committee meeting on August 17, 2026 - 9:0 The vote at First Reading on September 14, 2026 - 10:0 The vote at Second Reading and Public Hearing on September 28, 2026 - 10:0 d. 2026/46: An Ordinance Authorizing the County Administrator or negotiating authority in accordance with Resolutions 2019/44 and 2021/20 to execute any and all necessary documents for the acceptance of Right of Way and/or Temporary Construction Easement properties as shown on EXHIBIT A Pages 1-4 associated with the Sidewalks and Multi-use Pathways – Safe Routes to Page 2 of 332 Schools and EXHIBIT A Pages 5-8 associated with the Lady’s Island Corridor Traffic Improvements. The vote at the Public Facilities Committee Meeting on August 17, 2026 - 9:0 The vote at First Reading on September 14, 2026 - 10:0 The vote at Second Reading and Public Hearing on September 28, 2026 - 10:0 12. ORDINANCES FOR SECOND READING: a. 2026/47: An Ordinance authorizing the County Administrator to execute an Electric Line Easement with Dominion Energy on the property known as Pocotaligo Preserve (TMS R710 012 000 0001 0000 and R710 012 000 0072 0000). The vote at Natural Resources Committee on September 8, 2026 - 7:0 The vote at First Reading on September 28, 2026 - 10:0 b. 2026/48: An Ordinance amending the Beaufort County Code of Ordinances, Chapter74 - Building and Building Regulations, Section 74-64, Adoption of Building Codes (Amends Code of Ordinances to adopt the 2024 State Mandated Code Editions). The vote at Natural Resources Committee on September 8, 2026 - 7:0 The vote at First Reading on September 28, 2026 - 10:0 13. ORDINANCES FOR FIRST READING: a. 2026/49: An Ordinance authorizing the private road acceptance of Bellinger Bluff Road and Bellinger Neck Road into the County Road Inventory. The vote at Public Facilities Committee on September 21, 2026 - Failed 3:7 b. 2026/50: An Ordinance to amend Beaufort County's Budget Ordinance for Fiscal Year 2027 (Ordinance No. 2026/29) to amend Section III, County Operations Revenues, and Section IV, County Operations Appropriations to appropriate Fund Balance for Beaufort County Regions Tournament Complex. The vote at Finance, Administration, and Economic Development Committee on September 21, 2026 - Failed 5:5 14. ADJOURNMENT To watch committee or County Council meetings or for a complete list of agendas and backup packages, please visit: https://beaufortcountysc.gov/council/council-committee-meetings/index.html Page 3 of 332 Caucus Meeting Beaufort County, SC Council Chambers, Administration Building Beaufort County Government Robert Smalls Complex 100 Ribaut Road, Beaufort Monday, September 14, 2026 4:00 PM MINUTES Watch the video stream available on the County's website to hear the Council’s discussion of a specific topic or the complete meeting https://beaufortcountysc.new.swagit.com/videos/400863 1. Call to Order Chair Howard called the meeting to order at 4:00 PM Present Chair Alice Howard Vice-Chair Anna Maria Tabernik Council Member David Bartholomew Council Member Paula Brown Council Member Logan Cunningham Council Member Gerald Dawson Council Member Mark Lawson Council Member Lawrence McElynn Council Member Joseph Passiment Council Member Thomas Reitz Absent Council Member York Glover 2. Pledge of Allegiance Chair Howard led the Pledge of Allegiance. 3. Statement of Compliance with FOIA Chair Howard stated that public notification of this meeting had been published, posted, and distributed in compliance with SC FOIA. 4. Approval of Agenda Motion: It was moved by Council Member Cunningham, seconded by Vice-Chair Tabernik to approve the agenda. Motion to Amend: It was moved by Council Member McElynn, seconded by Council Member Bartholomew to amend the agenda to add item for consideration of structural, ethical, and organizational reasons for discussions regarding the creation of County Ordinance change in the reporting requirement Page 4 of 332 of the County Attorney from the County Administrator to County Council. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion to amend passed 9:0. Main Motion: It was moved by Council Member Cunningham, seconded by Vice-Chair Tabernik to approve the agenda as amended. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The amended motion passed 9:0. 5. Executive Session Motion: It was moved by Council Member Cunningham, seconded by Vice-Chair Tabernik to go into Executive Session. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 9:0. a. Under S.C. Code of Laws section 30-4-70(a)(1) discussion of personnel matters relating to an inquiry being conducted pursuant to S.C Code Section 4-9-660 (Quick Group) b. Under S.C. Code section 30-4-70(a)(2) legal advice related to discussion of negotiations incident to pending litigation or other matters covered by the attorney client privilege (Pine Island Property Holdings, LLC and Pine Island GC, LLC v. Beaufort County). c. Under S.C. Code section 30-4-70(a)(2) Discussion of negotiations incident to proposed contractual arrangements and legal advice related to pending, threatened, or potential claim or matters covered by the attorney client privilege (Charleton Mews Storm Drainage Issue on Bluffton Parkway). d. Under S.C. Code section 30-4-70(a)(2) legal advice related to discussion of negotiations incident to pending litigation or other matters covered by the attorney client privilege (Beaufort County v. Nova Industrial Properties, LLC - Condemnation case). e. Discussion of the Legal Department reporting to County Council instead of the County Attorney. 6. Matters Arising out of Executive Session Motion: It was moved by Chair Howard, seconded by Vice-Chair Tabernik that Council accept the proposed settlement offer from Nova Industrial Properties, LLC and that we authorize the County Administrator to execute the proposed settlement agreement. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 9:0. 7. Adjournment Motion: It was moved by Council Member Passiment, seconded by Council Member Dawson to adjourn the meeting. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Brown, Council Member Page 5 of 332 Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 9:0. COUNTY COUNCIL OF BEAUFORT COUNTY BY: _________________________________________ Alice G. Howard, Chairman ATTEST: ______________________________________ Sarah W. Brock, Clerk to Council Ratified: Page 6 of 332 County Council Meeting Beaufort County, SC Council Chambers, Administration Building Beaufort County Government Robert Smalls Complex 100 Ribaut Road, Beaufort Monday, September 14, 2026 6:00 PM MINUTES Watch the video stream available on the County's website to hear the Council’s discussion of a specific topic or the complete meeting https://beaufortcountysc.new.swagit.com/videos/400866 1. Call to Order Chair Howard called the meeting to order at 6:05 PM Present Chair Alice Howard Vice-Chair Anna Maria Tabernik Council Member David Bartholomew Council Member Paula Brown Council Member Logan Cunningham Council Member Gerald Dawson Council Member Mark Lawson Council Member Lawrence McElynn Council Member Joseph Passiment Council Member Thomas Reitz Absent Council Member York Glover 2. Pledge of Allegiance and Invocation Council Member Lawson led the Pledge of Allegiance and gave the invocation. 3. Statement of Compliance with FOIA Chair Howard stated that public notification of this meeting had been published, posted, and distributed in compliance with SC FOIA. 4. Approval of Agenda Motion: It was moved by Vice-Chair Tabernik, seconded by Council Member Lawson to approve the agenda. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. Page 7 of 332 5. Approval of Minutes Motion: It was moved by Vice-Chair Tabernik, seconded by Council Member Lawson to approve the minutes from Caucus and County Council August 10, 2026. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. 6. Proclamation a. Proclamation recognizing Fire Safe South Carolina Community Designations Vice-Chair Tabernik presented a proclamation to the Fire Districts of Beaufort County recognizing them for receiving the Fire Safe South Carolina Community Designations. b. Proclamation recognizing the week of September 17 through 23 as Constitution Week. Council Member Passiment presented a proclamation to Missy Thorpe recognizing the week of September 17 through 23 as Constitution Week. c. Proclamation recognizing September 2026 as National Recovery Month Council Member McElynn presented representatives from Nexus a proclamation recognizing September 2026 as National Recovery Week. 7. Administrator’s Report Michael Moore, County Administrator, presented recognition to county employees for years of longevity and retirement, introduced the new Detention Center Director, and recognized the First Responder of the Year. Mr. Moore provided updates on the Sales Tax Referendum, the 278 Bridge project, the Alljoy Pathway Project, and the new Fire Station 39. Please watch the video stream on the county's website to view the full report. https://beaufortcountysc.new.swagit.com/videos/400866 8. Public Comment Period Public comments were taken. Please watch the video stream on the county's website to view the full comment period. https://beaufortcountysc.new.swagit.com/videos/400866 9. Liaison and Committee Reports Council members gave updates on the boards and commissions. Please watch the video stream on the county's website to view the full report. https://beaufortcountysc.new.swagit.com/videos/400866 10. Approval of Consent Agenda Motion: It was moved by Council Member Cunningham, seconded by Council Member Passiment to approve the consent agenda. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. CONSENT AGENDA a. Items Originating from the Public Facilities and Safety Committee Page 8 of 332 1. Approval of Contract to Cape Romain Contractors, Inc for the demolition and removal of the Wimbee Creek Fishing Pier ($563,282.50) 2. Approval of a contract for Admin Building Mechanical System Replacement via OMNIA Purchasing Cooperative ($1,084,904) 3. Approval of Talbert, Bright & Ellington Work Authorization 2119-2410 Amendment 1 for Financial Planning, Passenger Facility Charge (PFC) Application Coordination, and Airline Rates and Charges Support Services ($204,128.97) 4. Approval of a contract to Edison Foard for the design-build of an Eight-Bay T-Hangar and 50' x 50' Box Hangar at Beaufort Executive Airport (ARW) ($2,107,000) 5. Approval of Contract to Esposito Construction for the Design/Build project for Fort Fremont Stairs & Rails Construction ($617,288.95) END OF CONSENT AGENDA 11. Agenda Items a. Appointment of John Meers to the Airports Board for a two-year term with the expiration date of July 2028. Motion: It was moved by Council Member Passiment, seconded by Council Member Cunningham to approve the appointment of John Meers to the Airports Board for a two-year term with the expiration date of July 2028. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. b. Discussion of Transfer and Acceptance of Intergovernmental Support Agreement (IGSA) Between Marine Corps Air Station Beaufort, Beaufort County School District, and Beaufort County Motion: It was moved by Council Member Passiment, seconded by Vice-Chair Tabernik to put the item on the floor for discussion. Council directed Administration and Staff to go forward with the transfer and acceptance of the IGSA. Please watch the video stream on the county's website to view the full discussion. https://beaufortcountysc.new.swagit.com/videos/400866 c. Approval of an assignment of contract to Tri Point Homes from Village Park Communities in a existing three-way agreement with Beaufort County, Town of Bluffton and Village Park Communities Agreement for Engineering Services Holly Hill Road. Motion: It was moved by Vice-Chair Tabernik, seconded by Council Member Passiment to approve of an assignment of contract to Tri Point Homes from Village Park Communities in a existing three way agreement with Beaufort County, Town of Bluffton and Village Park Communities Agreement for Engineering Services Holly Hill Road. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. d. Business License Appeal: Geismar North America Page 9 of 332 Motion: It was moved by Council Member Passiment, seconded by Council Member Dawson to put the item on the floor for discussion. Motion: It was moved by Council Member Dawson, seconded by Council Member McElynn to have the County Attorney negotiate a settlement between Geismar North America and the business license department. The Vote - Voting Yea: Chair Howard, Council Member Brown, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. Voting Nay: Vice-Chair Tabernik and Council Member Cunningham. Abstaining: Council Member Bartholomew. The motion passed 7:2:1 12. Ordinances for Second Reading a. 2026/41: An Ordinance amending the Community Development Code (CDC): section 5.3.20 (applicability), 4.2.20 (standards for free-standing accessory buildings/structures), 5.8.100 (screening), and 10.1.190 (definitions) (PUBLIC HEARING) Motion: It was moved by Council Member Passiment, seconded by Council Member Dawson to approve Second Reading and Public Hearing of Beaufort County Ordinance 2026/41 for the following reasons: it is consistent with the goals, objectives, and policies of the comprehensive plan; it is not in conflict with any provision of this development code or the code of ordinances; it is not required by changed conditions; it does address a demonstrated community need; it is consistent with the purpose and intent of the zones in this development code, or would improve compatibility among uses and ensure efficient development within the county; it would result in a logical and orderly development pattern; and it would not result in adverse impacts in the natural environment including but not limited to water, air, noise, stormwater management, wildlife, vegetation, wetlands, and the natural functioning of the environment. Vice-Chair Tabernik opened the floor for public comment. No one came forward. Vice-Chair Tabernik closed the floor for public comment. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. b. 2026/42: An Ordinance amending the zoning map for 1.4 acres (R300 012 000 0129 0000, R300 012 000 047A 0000) from T2R to T2RC. (PUBLIC HEARING) Motion: It was moved by Council Member Passiment, seconded by Chair Howard to approve Second Reading and Public Hearing of Beaufort County Ordinance 2026/42 for the following reasons: it is consistent with the goals and policies of the comprehensive code and the purposes of the development code; it is not in conflict with provisions of the development code and our code of ordinances; it is not required by changed conditions; it is compatible with existing and proposed use of land surrounding this land; it would not adversely affect nearby land; it would result in logical and orderly development patterns; it would not result in adverse impact on the natural environment (water, air, noise, stormwater management, wildlife, vegetation, wetlands, and the natural functioning of the environment); and it would result in development that is adequately served by public facilities (streets; potable water, sewer, stormwater management, solid waste collection and disposal, schools, parks, police, fire, emergency medical facilities). Page 10 of 332 Vice-Chair Tabernik opened the floor for public comment. No one came forward. Vice-Chair Tabernik closed the floor for public comment. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. Voting Nay: Council Member Cunningham. The motion passed 9:1. 13. Ordinances for First Reading a. 2026/43: An ordinance to amend Ordinance 2026/29 to authorize the transfer of funds. Motion: It was moved by Council Member Passiment, seconded by Council Member Lawson to approve the First Reading of Beaufort County Ordinance 2026/43. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. Voting Nay: Council Member Bartholomew. The motion passed 9:1. b. 2026/44: An Ordinance Amending the FY2027 Budget for Stormwater Utility Operations, Carryover Purchase Orders, Accommodations & Hospitality Tax projects, and Facility Operations. Motion: It was moved by Chair Howard, seconded by Council Member Passiment to approve First Reading of Beaufort County Ordinance 2026/44. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. c. 2026/45: An Ordinance Authorizing the County Administrator to Execute the Necessary Documents and Provide Funding for the Purchase of Real Property Identified as TMS Nos. R200- 010-000-0340-0000, R200-010-000-021G-0000, and R200-010-000-0446-0000 from Brickyard Commons, LLC for the Royal Pines Stormwater Project in the amount of $3,475,000. Motion: It was moved by Council Member Bartholomew, seconded by Chair Howard to approve First Reading of Beaufort County Ordinance 2026/45. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. d. 2026/46: An Ordinance Authorizing the County Administrator or negotiating authority in accordance with Resolutions 2019/44 and 2021/20 to execute any and all necessary documents for the acceptance of Right of Way and/or Temporary Construction Easement properties as shown on EXHIBIT A Pages 1-4 associated with the Sidewalks and Multi-use Pathways – Safe Routes to Schools and EXHIBIT A Pages 5-8 associated with the Lady’s Island Corridor Traffic Improvements. Page 11 of 332 Motion: It was moved by Council Member Dawson, seconded by Council Member Bartholomew to approve First Reading of Beaufort County Ordinance 2026/46. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. 14. Resolutions a. 2026/36: Resolution to Award FY26 Local 3% Accommodations Tax Grants Motion: It was moved by Vice-Chair Tabernik, seconded by Council Member Cunningham to approve Beaufort County Resolution 2026/36. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. b. 2026/37: Resolution to Award FY26 Local 2% Hospitality Tax Grants. Motion: It was moved by Vice-Chair Tabernik, seconded by Council Member Cunningham to approve Beaufort County Resolution 2026/37. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. c. 2026/38: Resolution to establish and authorize the implementation of a Retiree Health Reimbursement Arrangement for eligible Beaufort County retirees. Motion: It was moved by Council Member Bartholomew, seconded by Council Member McElynn to approve Beaufort County Resolution 2026/38. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. d. 2026/39: Resolution Authorizing the County Administrator to Pursue Condemnation for Portions of Parcels as Specified on Exhibit "A" Associated with Right-of-Way Acquisition for a Sidewalk Located on Big Estate Road as Part of the 2018 One Cent Referendum. Motion: It was moved by Council Member Dawson, seconded by Council Member Cunningham to approve Beaufort County Resolution 2026/39. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. e. 2026/40: Resolution to Adopt of the 2026 Lowcountry Hazard Mitigation Plan. Motion: It was moved by Council Member Passiment, seconded by Council Member Cunningham to approve Beaufort County Resolution 2026/40. Page 12 of 332 The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. f. 2026/41: Resolution to accept a Federal Aviation Administration (FAA) Airport Improvement Program (AIP) grant in the amount of $1,819,044 to reimburse Beaufort County for the purchase of 26 Hunter Road, contingent upon receipt of the final FAA grant offer. Motion: It was moved by Council Member Reitz, seconded by Council Member Bartholomew to approve Beaufort County Resolution 2026/41. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. g. 2026/42: Resolution to accept a Federal Aviation Administration (FAA) Airport Infrastructure Grant (AIG) in the amount of $1,358,322 to reimburse Beaufort County for the purchase of 28 Hunter Road, contingent upon receipt of the final FAA grant offer. Motion: It was moved by Council Member Reitz, seconded by Council Member Bartholomew to approve Beaufort County Resolution 2026/42. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. 15. Adjournment Motion: It was moved by Council Member McElynn, seconded by Council Member Bartholomew to go back into Executive Session. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. There were no matters coming out of Executive Session. COUNTY COUNCIL OF BEAUFORT COUNTY BY: _________________________________________ Alice G. Howard, Chairman ATTEST: ______________________________________ Sarah W. Brock, Clerk to Council Ratified: Page 13 of 332 Whereas, libraries are essential to the educational, social, and cultural fabric of our communities, providing access to knowledge, information, and resources that empower people of all ages and backgrounds; and Whereas, the Friends of the Beaufort Library, Friends of the Bluffton Library, and Friends of the Hilton Head Island Library support fundraising efforts that provide additional programs, special projects, collections, and enhancements that enrich the library experience for residents throughout Beaufort County; and Whereas, the Friends support programs such as Summer Reading and Winter Reading, advocate for well-funded libraries, and help ensure access to materials, services, and opportunities that promote literacy and lifelong learning; and Whereas, through their generosity, volunteer service, and commitment to the Beaufort County Library, the Friends demonstrate the positive impact of civic engagement and volunteerism in strengthening our communities; Now, therefore be it resolved, that Beaufort County Council does hereby proclaims “October 18th-24th National Friends of Libraries Week” and encourages residents to join and support a local Friends of the Library group in recognition of their continued dedication and service to our Beaufort County libraries and communities. Dated this 12th day of October 2026. ___________________________________ Alice Howard, Chair Beaufort County Council ~ Proclamation ~ Page 14 of 332 Whereas, the Beaufort County Transportation Committee plays an important role in planning for transportation needs and investing in roads, infrastructure, and transportation improvements throughout Beaufort County; and Whereas, Kraig Gordon has dedicated eleven years of service to the Beaufort County Transportation Committee, including serving as Chairman and providing leadership, guidance, and commitment to the Committee’s work; and Whereas, Mr. Gordon’s background in civil engineering, public works, and the construction of bridges and highways has provided valuable experience and knowledge in support of Beaufort County’s transportation needs; and Whereas, throughout his tenure, Mr. Gordon worked with Committee members, County staff, municipalities, and the South Carolina Department of Transportation to support transportation projects and investments benefiting Beaufort County. Now, therefore be it resolved, that Beaufort County Council does hereby recognizes and honors Kraig Gordon for eleven years of dedicated service and leadership as Chairman of the Beaufort County Transportation Committee, and expresses its sincere appreciation for his contributions to Beaufort County and its citizens. Dated this 12th day of October 2026. ___________________________________ Alice Howard, Chair Beaufort County Council ~ Proclamation ~ Page 15 of 332 Page 16 of 332 J#2 REQUEST FOR PUBLIC COMMENTS Beaufort County, SC Council Date: / 6 / L J__ J JJ.,,, Name-Print: CJ)..rrrf:...<2 • M 6_J o r District: ;:;_ • , • /uq_ Topic: SJ- I 1 � �J ' CFo Email Address: (if you would like someone to reach out to you) �Vlvrl e/1 s1-c. h ji./\__ l � 4 'Moo ., co tr\ PUBLIC COMMENTS Beaufort County, SC Council Date: (0/ / 2_/ 2� Name-Print: Jo� fl Dv n f\ District: Blc:.J �t+ao Topic: f"fo ck C "'wi-er0'.\5 Email Address: (if you would like someone to reach out to you) ,�john p�un11 3@jMC1�1 <t◊r"i Signature: � P [}./VY{\t Page 17 of 332 v#4 REQUEST FOR PUBLIC COMMENTS Beaufort County, SC Council Date: /0 / J h r -1 - -l Name-Print: /:-.1 {\ J IQ�-?20 District: ?f-_ T {OkVllvf Topic: Ett1/C> Email Address: (if you would like someone to reach out to you) Signature: ____________________ _ '/J#5 REQUEST FOR PUBLIC COMMENTS Beaufort County, SC Council Date: I t?J I / a. I Name-Print: &« rr '1 1h ,' 1:--,llt-1 dcv, District: /111ql£,li"1 C[ 11 .,_ , 7 Topic: /., (i, 5}_ liJ EJ · Email Address: (if you would like someone to reach out to you) Page 18 of 332 Page 19 of 332 Page 20 of 332 If you believe that you have participated in what is described above and you have any questions regarding current litigation cases, please contact our County Attorney, Brian Hulbert. Every council member needs to carefully consider whether they should initiate or participate in any of the meetings or discussions listed above. Copy to: Michael Moore, County Administrator Brian Hulbert, County Attorney Sincerely, �lbwd Alice Howard, Chairman Beaufort County Council Page 21 of 332 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: APPROVAL OF TASK ORDER TO COLLINS ENGINEERS, INC FOR THE DESIGN OF IMPROVEMENTS AND EXPANSION OF THE EDDINGS POINT BOAT LANDING ($233,912.80) (PENDING A&H TAX AWARDS ON 9/14/26) MEETING NAME AND DATE: County Council October 12, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval of task order to Collins Engineers, Inc. for the design and permitting of improvement and expansion of the Edding's Point Boat Landing in the amount of $233,912.80. PRESENTER INFORMATION: Bryan Bauer, PE - Director of Engineering (5 min) ITEM BACKGROUND: The Edding's Point Boat Landing was identified in the Beaufort County Public Boat Landing Facilities Study as a high-priority for future expansion. It is one of the busier boat landings in the County and lacks adequate parking and amenities. The project was selected for FY 2026 ATAX funding. Collins Engineers, Inc was one of three consultants selected in the competitively bid RFQ # 040726 On-Call Marine and Coastal Engineering Services FISCAL IMPACT: The fee for Collins Engineers, Inc. for the design and permitting of improvement and expansion of the Edding's Point Boat Landing is $212,647.80. Staff recommends a 10% contingency of approximately $21,265 for a total of $233,912.80. Funding for this project is from A & H tax with account number 2001-10-0000-57130-EDPT with a balance to be updated after Council meeting on 9/14/26. APPROVAL HISTORY: The project was approved for award of FY 2026 ATAX funding at the August 17, 2026 Finance meeting and then at County Council on September 14, 2026. Page 22 of 332 Brian Bauer, PE, ENV SP August 27, 2026 Beaufort County Director of Engineering 104 Industrial Village Road Building 3 Beaufort, SC 29906 843-255-2706 RE: Eddings Point Boat Landing Improvement Proposal Dear Mr. Bauer: Collins Engineers, Inc. (Collins) is pleased to sub mit this cost proposal to Beaufort County (County) to provide civil engineering services in support of im provements to the Eddings Point Boat Landing site located at 511 Eddings Point Road in Beaufort County, South Carolina. The scope of services for this project shall be subject to the terms and conditions of the On Call Marine and Coastal Engineering Services contract dated June 10, 2026. Collins understands that the County has identified Eddings Point Boat Landing for enhancement and improvements to better serve the residents of Beauf ort County under the 2023 Public Boat Landing Facilities Study. Key elements of improvements on t his project include the expansion of parking, improvement of the parking and drive surfaces, crea tion of a walking trail, launch ramp improvements, shoreline stabilization, consideration for an addit ional fishing pier, dock improvements and direction al signage. Efforts will be made to incorporate resili ent practices where permissible, such as living/hyb rid shorelines, stormwater treatment systems, corrosion resistant material selections, staging areas for emergency response and sea-level rise considerations. Scope of Work Following is a summary of the scope of services that Collins anticipates performing: I. Meetings A. Project Kickoff Meeting: Collins proposes to meet with Beaufort County stakeholders to kickoff the design efforts. It is anticipated that the kick off meeting will las no more than 2 hours in duration. The kickoff meeting will include a discussion regarding permitting and include Beaufort County permitting and Resource Land Consultants (RLC). B. Design Submittal Review Meetings : At the conclusion of each design stage, Collins will conduct a design review meeting to review consolidated comments from Beaufort County stakeholders. It is assumed Collins will have consolidated comments prior to the review meeting and will come prepared to discuss any comments requiring greater discussion. It is assumed that each design review meeting will be 2 hours in duration. Page 23 of 332 C. Monthly Coordination Calls: Collins will attend monthly meetings with the Beau fort County Project Manager to discuss the project. Calls are anticipated to average 30 minutes in duration. Issue tracking and risk register review shall be di scussed during these meetings; Collins will maintain a list of ongoing issues along with resolutions when developed. II. 30% Design (Schematic Design) A. Basis of Design Memorandum: This document will outline the design criteria, assumptions, and methodologies used in the schematic design phase. It will include: • Project objectives and scope • Design assumptions and criteria • Preliminary design calculations • List of anticipated drawings and specifications B. Survey and Geotechnical Investigation: Complete a topographical and site survey of the fu ll parcel(s), including Jenkins Creek adjacent to the site. A geotechnical investigation will also be conducted to provide pavement recommendations and evaluate permeability of the site. C. Schematic Drawings: These drawings will provide a preliminary layout o f proposed modifications, including: • General layout of parking and traffic flow • Proposed drainage scheme • Critical area impacts D. Anticipated Drawings and Specifications: A comprehensive list of all drawings and specifications expected to be developed during the detailed design phase. E. Cost Estimate: Collins will develop a Class IV estimate as defined by AACE. F. Schedule: Collins will provide a schedule of design, permitt ing and construction activities anticipated for the project. III. 60% Design (Detailed Design) A. Plans and Specifications: The detailed design phase will produce plans and s pecifications that are complete to an overall average of 60%, including: • Detailed layout of parking, staging, traffic and surface improvements • Storm structure locations and details • Defined critical area impacts and mitigation plan • Utility routing • Final grading B. Design Review and Coordination: Coordination with Beaufort County and other stakeholders to review the 60% design documents and incorporate feedback. Page 24 of 332 C. Cost Estimate: Collins will provide a class II estimate as define d by AACE. The design will be considered frozen at the conclusion of the 60% design review process. Any changes made after this may have a significant impact on project schedule and cost. D. Schedule: Collins will provide an updated schedule at this design submission. IV. 90% Design (Final Design) A. Final Plans and Specifications: The final design phase will produce plans and specifications that are 90% complete and ready for Beaufort County review, including: • Complete set of construction drawings • Finalized details • Draft front-end documents • Liquidated damages and schedule recommendations • SWPPP B. Quality Control and Assurance: Conduct thorough quality control and assurance rev iews to ensure the design meets all project requirements and standards. C. Final Design Review: Facilitate a final design review meeting with Beau fort County to address and remaining comments and finalize the design documents. D. Cost Estimate: Collins will develop a Class I estimate as defined by AACE. It is anticipated this cost estimate will be updated during the bid phase of the project. E. Schedule: Collins will provide an updated schedule at this design submission. V. 100% Design (Issued for Bid Documents) A. Sealed Drawing and Specification Set: Collins will provide a sealed set of construction drawings and specifications for bidding purposes. B. O & M Manual: Collins will prepare a short and concise O&M Manua l for the County outlining any requirements listed on construction plans for required maintenance of proposed facilities. C. Bid Support: Collins will prepare materials for and attend a pr e-bid meeting and support Beaufort County during the bid process by respondin g to bidder inquiries and issuing any necessary addenda. Collins will also review the bids for responsiveness and responsibleness and issue a path forward recommendation letter to Beauf ort County for use in considering and awarding bids. D. Cost Estimate: Collins will update the previous Class I estimate during the bid phase. VI. Permitting Collins will engage Resource Land Consultants as a subconsultant to manage and execute the permitting efforts required for the Eddings Point Boat Landing project. The scope of services for permitting will include the following tasks: Page 25 of 332 A. Permitting Strategy Development: a. Initial Assessment: Conduct an initial assessment to identify all nece ssary permits and regulatory requirements b. Permitting Plan: Develop a comprehensive permitting plan outlining the steps, timelines, and responsibilities for obtaining the required permits. B. Regulatory Coordination: a. Agency Consultation: Engage in early consultation with relevant regulat ory agencies, including the U.S. Army Corps of Engineers (USACE), U.S. Coast Guard (USCG), South Carolina Department of Environmental Services (DES), Coastal Zone Consistency Division (CZC) Bureau of Coastal Management, and other stakeholders. b. Pre-applications Meetings: Schedule and conduct pre-application meetings with regulatory agencies to discuss project scope, poten tial impacts, and permitting requirements as required. C. Permit Application: a. Nationwide Permit: Determine if the project qualifies for a Nationwid e Permit and prepare the necessary documentation for submission. b. Additional Permits: Identify and prepare applications for additional p ermits required, such as local construction permits, water quality c ertifications, and coastal zone consistency determinations. D. Public Involvement: a. Public Notices: Prepare and distribute public notices as required b y regulatory agencies to inform the public about the project and solicit feedback. VII. Construction Administration A. Conformed Document Set: Upon completion of the procurement and contract aw ard process, Collins will utilize addenda, clarifications and an y negotiations to updated construction documents to one conformed set with the intention to issue for construction. B. Meetings: Attend the preconstruction meeting and monthly pro gress meetings for a duration up to 8 months of construction. Collins will also b e present at and document the substantial completion inspection, the final completion inspect ion and the warranty inspection (post construction). C. RFIs and Submittals: Collins will review, evaluate and respond to up to 10 RFIs and 10 submittals from the selected contractor. D. Site Observations: Collins we perform observations of construction pr ogress on site twice monthly for the duration of the project, up to 8 months from construction NTP. E. Record Drawings: Upon completion of construction Collins will utili ze redline documents provided by contractor to update the design drawings and generate record drawings. Collins will also update the O&M manual with applicable changes applicable since draft issued at 100% plans. Page 26 of 332 Project Schedule The following milestones are proposed, assuming a Notice to Proceed no later than October 1, 2026. Days are in calendar days. • Schematic Design: 75 days from NTP • Detailed Design: 60 days from approval of SDs • Final Design: 60 days from approval of DDs • Issued for Construction: 120 days from approval of FDs • Permitting: 240 days from SDs • Construction Administration: As needed Fees Collins will provide the above scope of services on lump sum basis as follows. All of Collins’ rates are in accordance with our 2026/2027 rate schedule. A summary of estimated labor hours is also provided. Design.......................................................................................................... $113,020.00 Permitting ................................................................................................... $17,066.50 Surveying ..................................................................................................... $29,425.00 Geotechnical Investigation ......................................................................... $8,977.30 Construction Administration....................................................................... $41,810.00 Reimbursable Costs (travel, etc.) ................................................................ $2,349.00 Total Base Services ...............................................................................$21 2,647.80 In the event additional services are required, Collins recommends holding a budget of 10% for unforeseen conditions or client driven change directives. It is proposed that the Additional Services task will be executed only as authorized by Beaufort County, up to a total of $21,264.78. Additional Services ............................... ...............................................$ 21 ,264.78 Total Proposed Fee ................................ ..............................................$ 233 ,912.58 Page 27 of 332 Assumptions and Conditions A. This site lies within 1,500 LF of an active oyster reef and will require retention of the first 1.5” rainfall on site. B. Provide COLLINS with access to the site. C. Provide COLLINS with any available construction and/or repair documents of the structure. D. Provide COLLINS with a current geotechnical report of the proposed retaining wall site, sufficient for design of the proposed wall. E. Provide COLLINS with size, type, material and elevation of all utilities that enter the retaining wall project area or may impact the retaining wall design. Exemptions and Services not included All services not listed under "Services" are consid ered Additional Services. The compensation for the se services will be in addition to that for "Services." "Additional Services" include, but are not limited to the following: A. Visits to the site in excess of those noted in "Services" above. B. Conducting condition assessments of existing facilities. C. Engineering services incidental to project scope changes beyond COLLINS' control. D. Control over or charge of safety procedures, precautions, and programs. E. Construction administration and construction inspections beyond those listed in scope. F. Performing site survey for record drawings. Collins appreciates the opportunity to work with Be aufort County. Please feel free to contact Matthew Barrow, Regional Manager, at 843-410-3720 or mbarrow@collinsengr.com if you have any questions or comments regarding this proposal. Page 28 of 332 Determination of Price Reasonableness for Solicitation Procurement Services Department Solicitation Details Date/Time:* Aug 27, 2026 4:59 PM Preparer:* Bauer, Bryan From:* Bauer, Bryan Department:* Engineering Solicitation Number:* NA Purpose:* Edding's Point Boat Landing Improvement and Expansion Background Describe the relevant procurement, including a brief description of the product/service/scope of work.* Staff requested a proposal from Collins Engineers, Inc under their marine engineering on-call, per the process identified in the on-call policy manual, for the design and permitting of improvement and expansion of the Edding's Point Boat Landing. State procurement’s significance to the project or County operations.* The Edding's Point Boat Landing was identified in the Beaufort County Public Boat Landing Facilities Study as a high-priority for future expansion. It is one of the busier boat landings in the County and lacks adequate pakring and amenities. The project was selected for FY 2026 ATAX funding. Outline the procurement method utilized for this contract: (IFB, RFP, RFQ, Quotes).* Collins Engineers, Inc was one of three consultants selected in the competitively bid RFQ # 040726 On-Call Marine and Coastal Engineering Services. Staff requested a proposal from Collins Engineers, Inc under their marine engineering on-call, per the process identified in the on-call policy manual, for the design and permitting of improvement and expansion of the Edding's Point Boat Landing. https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 1/5 Page 29 of 332 Price Analysis Summarize the bid (s)/quotes (s) received with their respective amounts.* Collins proposal dated August 27, 2026 was for a fee of $206,664.80. If applicable: note any previous price history for similar procurements. Staff estimated the budget for the project to be $500,000 when submitting the ATAX application based on similar projects. Comparisons with substantially similar items.* The design of the Alljoy Boat Landing with similar scope was $495,000.The design of the Wimbee Creek boat landing with similar scope was $397,000. Sales of the same item to other purchasers.* NA Analysis of the cost elements (e.g. labor rate and estimated hours, material rates, indirect costs, reasonable profit)* Projects have been priced as man-hour estimates with a not to exceed cost. 8/27/26, 5:25 PM Nintex Forms for SharePoint Lists https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 2/5 Page 30 of 332 List and explain the benchmarks, market analysis, or other data sources used to evaluate price fairness.* Price submitted is less than budget allotted and similar in price to previous projects. Justification of Acceptance of Single Proposal/Bid Consideration of re-solicitation? Yes No Consideration of reasons for a single applicant? Yes No Explain: Collins Engineers, Inc was one of three consultants selected in the competitively bid RFQ # 040726 On-Call Marine and Coastal Engineering Services. Staff requested a proposal from Collins Engineers, Inc under their marine engineering on-call, per the process identified in the on-call policy manual, for the design and permitting of improvement and expansion of the Edding's Point Boat Landing. Consideration of reasonable search for qualified applicants? Yes No Explain: NA Cost Analysis (if applicable) Detail the cost elements (labor, materials, overhead, etc.) provided by the supplier or contractor. NA 8/27/26, 5:25 PM Nintex Forms for SharePoint Lists https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 3/5 Page 31 of 332 Provide an analysis of the necessity and reasonableness of each cost element. NA Vendor's Pricing Strategy (optional) What is the vendor's pricing strategy? Department Head Decision Comments Approve Disapprov e Department Head Signature Bauer, Bryan Date/Time Aug 27, 2026 5:11 PM Purchasing Decision 8/27/26, 5:25 PM Nintex Forms for SharePoint Lists https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 4/5 Page 32 of 332 Comments The price of the professional services is fair and reasonable and under the cost estimate. This procurement process complies with our procurement code. Approve Disapprov e Purchasing Signature Thomas, Dave Date/Time Aug 27, 2026 5:21 PM 8/27/26, 5:25 PM Nintex Forms for SharePoint Lists https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 5/5 Page 33 of 332 Page 1 of 2 1. CONTRACT NAME AND NUMBER 2. TASK ORDER NO.: 3. EFFECTIVE DATE: On-Call Marine and Coastal Engineering RFQ #040726 Eddings Point Dock September 1, 2026 TASK ORDER FOR SERVICES 4. CONTRACTOR NAME, ADDRESS, PHONE, AND EMAIL: Collins Engineers Inc. 5955 Core Rd, Suite 522 North Charleston, SC 29406 Matthew Barrow mbarrow@collinsengr.com 5. ISSUED BY: Beaufort County Procurement Services PO Drawer 1228 Beaufort, SC 29901 For Questions Contact: Gillian Murray (843) 255-2287 Email: gmurray@bcgov.net 6. PROJECT NAME/TITLE AND DESCRIPTION: Eddings Point Dock 1. Meetings 2. Schematic Design 3. Detailed Design 4. Final Design 5. 100% Design for bid documents 6. Permitting 7. Construction Administration 7. OTHER PERTINENT INFORMATION OR SPECIAL CONSIDERATIONS: This task order is issued pursuant to the Scope and Fee Proposal dated August 27, 2026 and attached. 8. PAYMENT TYPE: Vendor will be paid on a percentage complete basis with the submission of monthly invoices 9. LIQUIDATED DAMAGES N\A 10. NUMBER OF DAYS/MONTHS TO COMPLETE PROJECT 315 Days after issuance of Notice to Proceed 11. TOTAL AWARD AMOUNT: $212,647.80 12. Project Manager’s Name Mark Johnson Project Manager’s Email mjohnson@bcgov.net Project Manager’s Phone 843-255-2739 Page 34 of 332 Page 2 of 2 12. AUTHORIZED SIGNATURE FOR THE VENDOR: a. SIGNATURE: b. NAME/TITLE OF SIGNER: c. DATE SIGNED: 13. AUTHORIZED SIGNATURE FOR THE COUNTY a. SIGNATURE b. NAME/TITLE OF SIGNER c. DATE SIGNED 08/31/2026 Page 35 of 332 Timothy D. Weeks, PE Senior Vice President BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: APPROVAL OF A CHANGE ORDER TO MAJ ENTERPRISES, INC. FOR THE SHELL POINT TRAFFIC CALMING PROJECT ($53,592.09) MEETING NAME AND DATE: County Council October 12, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval of a change order to MAJ Enterprises, Inc. for the Shell Point Traffic Calming Project ($53,592.09) PRESENTER INFORMATION: Bryan Bauer, Director of Engineering (5 Minutes) ITEM BACKGROUND: On February 18, 2026 Beaufort County published an Invitation for Bid (IFB) # 032326 Shell Point Traffic Calming requesting competitive bids for materials and installation of traffic calming measures in the Shell Point neighborhood. Due to a resident complaint, one of the speed humps was moved to be further from their driveway. Also, a catch basin was discovered at Broad River Drive and Shell Point Road that required a traffic rated solid lid for the raised intersection. Additionally, construction quantities were substantially higher than estimated for the Asphalt Surface Course. Due to these factors, the costs have exceeded the contract amount. FISCAL IMPACT: The change order for materials and construction in the amount of $48,720.09 is needed to complete and close out the project. Staff recommends a 10% contingency of $4,872.00 for a total budget increase of $53,592.09. The change order will be funded from the Capital Projects Fund Account No. 4000-80-1243-54500 with a balance of $471,245. APPROVAL HISTORY: Resolution 2025/13 approved traffic-calming measures in the Shell Point neighborhood. On April 20, 2026 the Public Facilities Committee approved a contract with M.A.J. Enterprises, Inc. for $170,108.96. Page 36 of 332 Shell Point Traffic Calming Estimated Over/UnderLine Item Description Quantity Unit of MeasureUnit Cost Total Final Quant 1 1031000 Mobilization 1 LS $22,000.00 $22,000.00 1.00 22,000.00 $0.00 2 1032010 Bonds & Insurance 1 LS $8,500.00 $8,500.00 1.00 8,500.00 $0.00 3 1050800 Construction Stakes, Lines & Grades 1 EA $1,000.00 $1,000.00 1.00 1,000.00 $0.00 4 2012000 Clearing & Grubbing Within Roadway 1 LS $1,000.00 $1,000.00 1.00 1,000.00 $0.00 5 2033000 Liquid Asphalt Binder PG64-22 6 TN $366.67 $2,200.02 10.31 3,780.37 $1,580.35 6 4013990 Milling Existing Asphalt Pavement (Variable) 212 SY $16.00 $3,392.00 244.17 3,906.72 $514.72 7 4020320 Asphalt Base Course - Type B 10 TN $550.00 $5,500.00 9.25 5,087.50 -$412.50 8 4040340 Asphalt Surface Course - Type C 82 TN $525.00 $45,100.00 167.82 88,105.50 $45,055.50 9 6011000 Traffic Control 1 LS $15,000.00 $15,000.00 1.00 15,000.00 $0.00 10 6051120 Permanent Construction Signs (Ground Mounted) 496 SF $18.00 $8,928.00 94.00 1,692.00 -$7,236.00 11 6240110 4 In Yellow Solid Lines - Fast Dry Paint 60 LF $10.00 $600.00 324.00 3,240.00 $2,640.00 12 6240020 12 In White Solid Lines - Fast Dry Paint 350 LF $13.00 $4,550.00 400.00 5,200.00 $650.00 13 6240025 24 In White Solid Lines - Fast Dry Paint 50 LF $30.00 $1,500.00 50.00 1,500.00 $0.00 14 6281010 4 In White Solid Lines (edgline), High Build Paint - 25 mils 160 LF $30.00 $4,800.00 188.00 5,640.00 $840.00 15 6281105 4 In Yellow Solid Lines (centerline), High Build Paint - 25 mils 60 LF $35.00 $2,100.00 88.00 3,080.00 $980.00 16 6282020 12 In White Solid Lines, Sgl Comp. Hybridized Polymer - 25 mils 350 LF $50.00 $17,500.00 350.00 17,500.00 $0.00 17 6282025 24 In White Solid Lines, Sgl Comp. Hybridized Polymer- 25 mils 50 LF $60.00 $3,000.00 44.00 2,640.00 -$360.00 18 6510105 Flat Sheet, Type III, Fixed Size & Message Sign 178 SF $41.23 $7,338.94 152.00 6,266.96 -$1,071.98 19 6531210 U-Section Post for Sign Support - 3P 286 LF $10.00 $2,860.00 286.00 2,860.00 $0.00 20 7143618 18 In Smooth Wall Pipe 20 LF $100.00 $2,000.00 19.00 1,900.00 -$100.00 21 7149999 Cleaning Existing Pipe 120 LF $22.00 $2,640.00 34.09 750.00 -$1,890.00 22 7197052 Concrete Collar for up to 24 In Pipe 2 EA $750.00 $1,500.00 2.00 1,500.00 $0.00 23 8109901 Mowing 0.08 AC $6,250.00 $500.00 0.08 500.00 $0.00 24 8152007 Sediment Tube 4 EA $200.00 $800.00 4.00 800.00 $0.00 25 8153000 Silt Fence 100 LF $8.00 $800.00 100.00 800.00 $0.00 26 2031200  Site Excavation  (including Borrow) 1 LS $3,500.00 $3,500.00 1.00 3,500.00 $0.00 27 8100102 Permanent Grassing for Resurfacing Projects 0.05 AC $30,000.00 $1,500.00 0.056 1,680.00 $180.00 CO 1 Removal of Speed Hump 1 EA $5,300.00 $5,300.00 1.00 5,300.00 $5,300.00 CO 2 Inlet Top for Storm Drain Structure Under Roadway (discovered) 1 EA $2,050.00 $2,050.00 1.00 2,050.00 $2,050.00 Page 37 of 332 Total $170,108.96 $48,720.09 $216,779.05 Reduced Price from $550 per ton Page 38 of 332 SHELL POINT TRAFFIC CALMING Scope of Work The work will consist of furnishing all materials, labor and equipment for: Construction of one raised intersection w ith minor improvements at the intersection of Shell Point Road and Broad River Drive as well as three speed humps on Shell Point Road, five on Broad River Drive and one on Dogwood Street. All work under this contract shall be done in accordance with the South Carolina Department of Transportation (SCDOT) Standards (specifications, supplemental specifications, drawings and supplemental technical specifications); the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD) and all provisions of SCDOT Encroachment Permit No. 294120. All materials used in the contract work must be furnished from SCDOT Qualified Products Listing & Policies for Construction. A ll material certifications and submittals must be approved prior to incorporation into the work. It is preferred that the Prime Contractor be pre-qualified by SCDOT. All subcontractors must be listed in the bid package or approved by the County in writing prior to performing work on the project. The contractor shall provide independent third party SCDOT Certified Quality Control Inspections to include: • Set-up roller patterns, monitor asphalt placement, verify temperature, receiving load tickets. • Document all work and inspections in accordance with SCDOT procedures. Provide weekly copies of reports to County Project Manager. • Provide independent SCDOT Certified inspector at plant during batching operations to monitor and document product and tests in accordance with SCDOT requirements. Project Administration: Beaufort County Engineering 104 Industrial Village Rd, Bldg. 3 Beaufort, SC 29906 Project Administration will be provided by Beaufort County. Quality assurance inspection will be performed by an independent firm hired by Beaufort County. Page 425 of 522 Page 39 of 332 Contract Type: Unit Rate Quantities are approximate and payment shall be for measurements of actual in-place work as per the plans and specifications. Any quantities exceeding the contract amount shall be requested by the Contractor in writing, for approval by the County, prior to the work being performed. Payment will not be made for additional quantities without prior written approval of the County. The cost associated with any incidental items of construction in which no specific pay items are set up for shall be included in the overall cost of the project. Contract Documents: Contract Documents include the Shell Point Traffic Calming IFB documents, construction plans and the contract. The technical specifications (SCDOT Standards including Specifications, Drawings, Supplemental Specifications and Supplemental Technical Specifications) for the project are available online and are considered part of the contract documents. Contract Time: The Contractor shall agree to commence work under this contract within 10 working days after the Notice to Proceed (NTP) is issued and complete all work within 60 calendar days from NTP. The Contractor shall work continuously on the project after the Notice to Proceed is issued. Any punch list work shall be completed within 30 calendar days. Failure to complete all work within 60 calendar days plus any extension authorized in writing by the County, or complete punchlist work within 30 calendar days, shall entitle the County to deduct Liquidated Damages (LDs). LDs shall be deducted from the monies due the Contractor in the amount of $600 for each calendar day in excess of the authorized construction time as per the SCDOT schedule for liquidated damages 108.9. Traffic Control: Traffic Safety is paramount. The Contractor will be responsible for all traffic control, in accordance with the Manual on Uniform Traffic Control Devices, SCDOT standards and all other safety measures that will enhance the safety of the construction site. All costs associated with this work shall be included in the bid price for traffic control. The Contractor shall submit a traffic control plan for approval prior to beginning any work. Any changes to the approved traffic control plan must be submitted and approved in writing. The contractor shall designate a responsible person with sufficient qualifications who shall be responsible for administering the traffic control plan. This representative shall have successfully completed an advanced or supervisor work zone traffic control training program. The representative shall be on-site anytime work is being performed in or adjacent to the roadway to ensure proper installation, maintenance and removal of appropriate traffic control devices. Preconstruction Conference: The Contractor shall attend a pre-construction conference prior to commencing any work on site. Page 426 of 522 Page 40 of 332 Construction Schedule: The Contractor shall prepare a detailed schedule showing the sequence of operation and timeline of all phases of construction. The schedule must be submitted and approved prior to beginning work. Utilities: The Contractor will be responsible for all utility coordination, including required relocation, and protection of utility facilities. As-builts: Contractor shall submit record drawings (marked with any changes) and post construction survey invert elevations for the storm drain pipe. Clarifications Asphalt indexing using the SCDOT Index will not be utilized for this project. The milling is intended for the parabolic areas of the raised intersection (6 ft) as well as parabolic portions of the speed hump s (3 ft) each side to ensure a minimum lift of 150 lb/sy to the joint. Time between milling and asphalt application will not exceed 5 calendar days. Apply temporary paint striping, including stop bars and striping for the raised intersection and speed humps immediately following paving operations. There is no SWPPP for this project. Silt fence and sediment tubes w ill be installed as necessary and per the direction of the Engineer. The Unclassified Value within the contract, as per SCDOT may include but is not limited to: rock, existing storm drain pipe, soil, relocating suitable materials from one location to another location less than 3,000 LF, asphalt less than 2 inches thick, etc. Unclassified Value, when cross sections are provided, will be paid at 100% of this value, divided over the estimated monthly pay estimates based on the number of contract days. It is the contractor’s responsibility to bring to the immediate attention (within 1 business day) of the County representative if in-field cross sections do not conform to plan dimensions in order to be considered for additional payment. Borrow Values within the contract, as per SCDOT will be quantified by measurement of placed material. It is recommended the contractor perform elevation verifications prior to, and after removal of surficial organic matter. After placement of borrow to defined cross sections, post elevation verifications will be performed by the Couty to verify the placed borrow conforms to cross sections. If existing elevation verifications are not performed simultaneously with and agreed upon by county and contractor prior to borrow placement, elevations provided by cross sections will be used for calculations of placed borrow. If approved in writing by country, truck count method may be used. Truck Count Method- A standard quantity of cubic yards per truck will be agreed upon prior to the work. Daily random checks will be performed by the counties representative to verify the truck bed dimensions and volume of fill. No payment will be made for volumes exceeding the standard amount. Page 427 of 522 Page 41 of 332 Page 428 of 522 Page 42 of 332 Page 429 of 522 Page 43 of 332 Page 430 of 522 Page 44 of 332 1 STATE OF SOUTH CAROLINA ) ) CONTRACT COUNTY OF BEAUFORT ) Shell Point Traffic Calming THIS CONTRACT (hereinafter the "Contract") entered into this 8th day of April , 2026 , between the COUNTY OF BEAUFORT, South Carolina, a public body corporate and politic and political subdivision of the State of South Carolina, (hereinafter "County") and MAJ Enterprises, Inc. , (hereinafter the "Contractor"), ("Party" as to each; collectively the "Parties") WITNESSETH: WHEREAS, the County wishes to contract for Shell Point Traffic Calming (the "Work" and/or "Services"); and WHEREAS, the Contractor has represented to the County that its staff is qualified to provide the Work required in this Contract in a professional, timely manner; and WHEREAS, the County has relied upon the above representations by the Contractor; NOW, THEREFORE, in consideration of these premises and covenants set forth herein, it is agreed by and between the Parties as follows: SECTION ONE Contract Documents The Parties agree that the Contract Documents shall include the following, which are incorporated herein by reference: Exhibit A: Contractor's Bid dated March 23, 2026. Exhibit B: IFB 032326 In the event of any conflict, discrepancy, or inconsistency among any of the documents which make up this Contract, the following shall control: As between the Contract and the Contract Documents which make up this Contract, the Contract shall govern. In the event of any conflict, discrepancy, or inconsistency among any of the Contract Documents, the Contractor shall contact the County immediately upon discovery of the same for resolution by the County. Any documents not included or expressly contemplated in this Contract do not, and shall not, form a part of this Contract. The Contract Documents are intended to be complementary, and a requirement in one document shall be deemed a requirement in all documents. SECTION TWO Scope of Work The Contractor agrees to perform and furnish all labor, supervision, materials, equipment, transportation and supplies necessary for the completion of the Work required under this Contract in a timely and Page 432 of 522 Page 45 of 332 2 workmanlike manner, professional in all aspects, and in accord with all applicable laws, rules and regulations. The Contractor shall provide the services outlined below in conjunction with the Contractor's Bid dated March 23, 2026 marked as Exhibit A, that was previously incorporated by reference. The Contractor shall commence the Work as specified in the Notice to Proceed, when it is issued, but not before it is issued. Coordination of the Work and administration of this Contract shall be by Beaufort County. SECTION THREE Contract Price: Payment Terms County agrees to pay for the performance of the Work described in this Contract, including all items necessary to accomplish and complete the Work, in accordance with all terms and conditions as stated herein on the following basis: Contract Amount: One Hundred Seventy Thousand One Hundred Eight Dollars and Ninety-Six Cents ($170,108.96) Payments: Contractor will be paid on a line item by quantity basis with the submission of monthly invoices. Monthly payments will be made based on a line item quantities of work in place. Final payment which shall be paid upon Final Acceptance by the County's authorized representative. Final Acceptance is defined as the County accepting the Work from the Contractor when the County deems the Work completed in accordance with the terms of the Contract. Final Payment is defined as the last payment from the County to the Contractor of the entire unpaid balance of the Contract as adjusted by any approved change orders. Application for payment shall be prepared and submitted electronically. All invoices shall be addressed to Engineering Division, PO Drawer 1228 Beaufort SC 29901. SECTION FOUR Time: Term of Contract The County hereby contracts with Contractor to provide the Work specified herein within Sixty (60) calendar days after issuance of the Notice to Proceed. The County reserves the right to extend the term of this Contract, if it is determined to be in its best interest. The Contractor expressly acknowledges that time is of the essence in completion of this Contract and that the time limits and dates herein are critical components of the Contract. Therefore, liquidated damages have been set at $600 per calendar day. The Contractor warrants and represents that it has taken these facts into consideration and has determined that it can complete the work within these time limits, including time for likely delays caused by weather or from other sources. The Contractor will not be compensated for any delays beyond the time set forth herein. The Contractor's only remedy for delays may be an extension of time to perform the Work. Due consideration will be given to claims for an extension of time due to extraordinary circumstances only. Page 433 of 522 Page 46 of 332 3 SECTION FIVE Insurance Requirements The Contractor, at its own expense, shall at all times during the term of the Contract, maintain insurance as included in the solicitation, Insurance Requirements, which is attached hereto and previously incorporated by reference. The County may contact the Contractor's insurer(s) or insurer(s)' agent(s) directly at any time regarding the Contractor's coverages, coverage amounts, or other such relevant and reasonable issues related to this Contract. The Contractor shall also require any subcontractors to ca rry the same coverages in the same amounts. The County must be advised immediately of any changes in required coverages. SECTION SIX Compliance with Legal Requirements All applicable federal, state and local laws, ordinances, and rules and regulations of any authorities (including, but not limited to, any laws, ordinances or regulations relating to the S.C. Department of Revenue or the S.C. Board of Contractors) shall be binding upon the Contractor throughout the pendency of the Work. The Contractor shall be responsible for compliance with any such law, ordinance, rule or regulation, and shall hold the County harmless and indemnify same in the event of non- compliance as set forth in the Contract. The Contractor certifies that it will comply with the applicable requirements of Title 8, Chapter 14 of South Carolina Code of Laws (1976, as amended) and agrees to provide to the State upon request any documentation required to establish either: (a) that Title 8, Chapter 14 is inapplicable to the Contractor and its subcontractors or sub -subcontractors; or (b) that the Contractor and its subcontractors or subsubcontractors are in compliance with Title 8, Chapter 14. Pursuant to Section 8- 14-60, "A person who knowingly makes or files any false, fictitious, or fraudulent document, statement, or report pursuant to this chapter is guilty of a felony and, upon conviction, must be fined within the discretion of the Court or imprisoned for not more than five years, or both." The Contractor agrees to include in any contracts with subcontractors, language requiring subcontractors to (a) comply with applicable requirements of Title 8, Chapter 14, and (b) include in its contracts with the subcontractors language requiring the sub- subcontractors to comply with the applicable requirements of Title 8, Chapter 14. The Contractor agrees to and shall certify agreement to abide by the requirements under Title VI of the Civil Rights Act of 1964, and other non-discrimination authorities under Federal Executive Order Number 11246, as amended, and specifically the provisions of the equal opportunity clause. The Contractor shall comply with all federal, state and local laws, ordinances, rules and regulations of any authorities throughout the duration of this Contract. The Contractor shall be responsible for compliance with any such law, ordinance, rule or regu lation, and shall hold the County harmless and indemnify same in the event of non-compliance. Page 434 of 522 Page 47 of 332 4 SECTION SEVEN Drug-free Workplace Act The Contractor shall comply with the South Carolina Drug-free Workplace Act, Section 44-107-10 et seq., S.C. Code of Laws (1976, as amended). The County requires all contractors executing contracts for a stated or estimated value of $50,000 or more to sign a Drug-free Workplace Certification form prior to the issuance of the Notice to Proceed. SECTION EIGHT Contractor's Warranties and Representations The Contractor represents that its staff is knowledgeable about and experienced in performing the Work required in this Contract and warrants that it will use best skill and attention to provide above described Work in a professional, timely manner. The Contractor warrants and represents that it shall be responsible for all subcontractors working directly for it, as well as for their work product, as though the Contractor had performed the Work itself. 1. If equipment, materials and supplies are to be a part of the service provided, all equipment, materials, and supplies incorporated in the Work covered by the bid and provided by the Contractor are to be new and of the most suitable grade for the purpose intended. Unless otherwise specifically provided in this Contract, reference to any equipment, material, article or patented process, by trade name, make or catalog number, shall not be construed as limiting competition. When requested, the Contractor shall furnish to the Purchasing Director, for approval the name of the manufacturer, the model number, and other identifying data and information respecting the performance, capacity, nature and rating of the machinery and mechanical and other equipment which the Contractor contemplates incorporating in the Work. When required by this Contract or when called for by the Purchasing Director, the Contractor shall provide full information concerning the material or articles that he contemplates incorporating in the Work. When so directed, samples shall be submitted for approval at the Contractor's expense, with all shipping charges prepaid. Machinery, equipment, material and articles installed or used without the required prior approval of the County shall be at the risk of subsequent rejection by the County. 2. Any and all manufacturers' warranties on any equipment or materials will be passed on to the County and copies of said warranties will be furnished by the Contractor to the County upon completion and final acceptance of the Work. 3. The Purchasing Director may, in writing, require the Contractor to remove from the Work Site any employee the Purchasing Director deems incompetent, careless or otherwise objectionable. 4. In addition to any manufacturer's warranties, all labor and materials are warranted to be free from defects for a period of twelve (12) months after the date of Final Payment by the County. Page 435 of 522 Page 48 of 332 5 SECTION NINE Retention of Records The Contractor agrees to maintain for three (3) years from the date of Final Payment, or until the end of any audit or closure of all pending matters under this Contract, whichever is later, all books, documents, papers, and records pertinent to this Contract. The Contractor agrees to provide to the County, any federal grantor agency, the Comptroller General of the United States, any state gantor agency, any assignee, or any of their duly authorized representatives access to such books, documents, papers, a nd records for the purpose of examining, auditing, and copying them. The Contractor further agrees to include these provisions in any subcontracts issued in connection with this Contract. SECTION TEN State and Local Taxes Except as otherwise provided, Contract prices shall include all applicable state and local taxes. The Contractor shall calculate that portion of the Contract that is subject to the six percent (6%) South Carolina sales and/or use tax, and this amount shall be itemized and shown on all invoices, and shall be paid to the SCDOR by Contractor. If Contractor is a non- South Carolina Company, the County will withhold said amount from all invoices and remit payment to the SCDOR, unless the Contractor furnishes the County with a valid South Carolina Use Tax Registration Certificate Number. The Contractor shall indemnify and hold harmless the County for any loss, cost, or expense incurred by, levied upon or billed to the County as a result of the Contractor's failure to pay any tax of any type due in connection with this Contract. The Contractor shall ensure that the above sections are included in all subcontracts and sub -subcontracts, and shall ensure withholding on out of state sub and sub-subcontractors to which withholding is applicable. SECTION ELEVEN Independent Contractor The Contractor is an independent contractor and shall not be deemed the agent or employee of the County for any purpose whatsoever. Contractor shall not hold himself out as an employee of the County, and shall have no power or authority to bind or obligate the County in any manner, except the County shall make payment to the Contractor for work and expenses as herein provided. The Contractor shall obtain and maintain all licenses and permits required by law for performance of this Contract by him or his employees, agents, and servants. The Contractor shall be liable for and pay all taxes required by local, state or federal governments, including but not limited to social security, Workers' Compensation, employment security, and any other taxes and licenses or insurance premiums required by law. No employee benefits of any kind shall be paid by the County to or for the benefit of the Contractor or its employees, agents, or servants by reason of this Contract. SECTION TWELVE Other Contracts The County reserves the right to undertake or award other contracts for additional work/services, and may elect to complete portions of the Work/Services included in this Contract using its own forces or through other contracts, and the Contractor shall fully cooperate with such other contractors, County employees and Page 436 of 522 Page 49 of 332 6 carefully fit its own work/services to such work/services as may be directed by the County. The Contractor shall not commit or permit any act by its forces or subcontractors which will interfere with the performance of work/services by any other contractor or by County and or Department employees SECTION THIRTEEN Permits and Licenses The Contractor shall, without additional expense to the County, be responsible for obtaining and maintaining all necessary licenses and permits required by the State of South Carolina, a municipality or the County or any other authority having jurisdiction. Prior to execution of a contract, the Contractor may be required to provide a copy of its current applicable Contractor's License issued by the State of South Carolina and business license issued by the County. Contractor's (and or any subcontractor's) L icense Number, Person's Name and Business Name must all be shown on all required licenses. SECTION FOURTEEN Safety, Health, and Security Precautions The Contractor shall take proper safety, health and security precautions to protect its workers and the County's property, workers and the public at all times during the term of this Contract. All materials shall be stored securely, protected from theft or damage. SECTION FIFTEEN Inspection and Acceptance All Work shall be subject to inspection and test by the County at all reasonable times and places. The Contractor shall, without charge, correct any workmanship found by the County not to conform to the Contract requirements. SECTION SIXTEEN Conditions Affecting the Work The Contractor shall be responsible for having taken steps reasonably necessary to ascertain the nature and location of the Work, and the general and local conditions that can affect the Work or the cost thereof. Any failure by the Contractor to do so will not relieve the Contractor from responsibility for successfully performing the Work without additional expense to the County. The County assumes no responsibility for any understanding or representations concerning conditions made by any of its officers o r agents prior to the execution of this Contract, unless such understandings or representations by the County are expressly stated in this Contract. SECTION SEVENTEEN Cleanup Work: Repair of Damages During the performance of the Work, the Contractor shall continuously keep County-provided work space (the "Work Site") and areas adjacent thereto in an orderly condition, free and clear from debris and discarded materials. Contractor will restore or replace, when and as directed by the County, any public or private property damaged or destroyed by Contractor's work, equipment or employees to a condition at least equal to that existing immediately prior to the beginning of the Work. Page 437 of 522 Page 50 of 332 7 SECTION EIGHTEEN Damages The Contractor expressly agrees that if the Work, or any part thereof, is not performed or completed in a timely or professional manner in accordance with this Contract or any amendment thereto, the Contractor and its sureties shall be liable to the County for actual damages that relate to the Contractor's failure to perform or complete the Work in the manner described above. If actual damages are agreed to by the County and the Contractor or awarded by the Court, the County shall have the right to deduct f rom and retain out of monies, which may be then due or which may become due and payable to the Contractor, the amount of such actual damages; and if the amount so retained by the County is not sufficient to pay in full such actual damages, the Contractor and/or its sureties shall pay to the County the amount necessary to effect payment in full of such actual damages. SECTION NINETEEN Suspension of Work The Purchasing Director may order, in writing, the Contractor to suspend, delay, or interrupt all or any part of the Work for such period of time as he may determine to be appropriate for the convenience of the County. The County may suspend performance of its obligations under this Contract in good faith for the convenience of the County or to investigate matters arising in the Work. The Purchasing Director may order suspension of the Work in whole or in part for such time as he deems necessary because of the failure of the Contractor to comply with any of the requirements of this Contract, and the Contract's completion date shall not be extended on account of any such suspension of Work. When the Purchasing Director orders any suspension of the Work under the paragraph above, the Contractor shall not be entitled to any payment for Work with respect to the period during which such Work is suspended and shall not be entitled to any costs or damages resulting from such suspension. The rights and remedies of the County provided in this Section are in addition to any other rights and remedies provided by law or under this Contract. SECTION TWENTY Modification of Contract The County's Purchasing Director has the unilateral right to modify this Contract, within the general scope of work described above and in Exhibit B, when the modification is in the best interest of the County, provided however, the Contractor is given wri tten notice of any such modification and the County is responsible for paying Contractor for any additional expenses incurred by the Contractor that relate to the modification. Subject to the above, the Contractor shall immediately notify the County in wri ting of any proposed adjustment in its fee and the schedule for performance. The Contractor is obligated to perform the revised contract when so directed by the Purchasing Director, and the County is obligated to pay for the work performed pursuant to the modification. No claim by the Contractor for an adjustment hereunder shall be allowed if asserted after Final Payment under this Contract. SECTION TWENTY-ONE Termination Page 438 of 522 Page 51 of 332 8 1. For Convenience The Purchasing Director, by advance written notice, may terminate this Contract when it is in the best interests of the County. If this Contract is so terminated, the Contractor shall be compensated for all necessary and reasonable direct costs of performing the Work actually accomplished. The Contractor will not be compensated for any other costs in connection with a termination for convenience. The Contractor will not be entitled to recover any damages in connection with a termination for convenience. 2. For Default If the Contractor refuses or fails to perform the Work or any separable part thereof in a timely or workmanlike manner in accordance with the Contract Documents, or otherwise fails, in the sole opinion of the County, to comply with any of the terms and conditions of the Contract Documents deemed, in the sole opinion of the County, to be material (including, without limitation, the requirement that Contractor obtain and maintain in force all necessary permits), such refusal or failure shall be deemed a default under this Contract. In the event of a default under this Section, the County shall have the right to inform the Contractor of the default and demand that the Contractor immediately deliver a plan to remedy the default. If the Contractor does not respond with a timely or reasonably achievable plan, the County may terminate forthwith this Contract by additional written notice to the Contractor. In the event of such default, the advance notice period for termination is waived and the Contractor shall not be entitled to any costs or damages resulting from a termination under this Section. Whether or not the Contractor's right to proceed with the Work is terminated, it and its sureties shall be liable for any damage to the County resulting from the Contractor’s default. Any wrongful termination for default shall be deemed by the Parties a termination for convenience. 3. Termination for Non-Appropriation of Funds The Purchasing Director, by written advance notice, may terminate this Contract in whole or in part in the event that sufficient appropriation of funds from any source (whether a federal, state, County or other source) are not made or sufficient funds are otherwise unavailable, in either case, to pay the charges under this Contract. If this Contract is so terminated, the Contractor shall be compensated for all necessary and reasonable direct costs of performing the Work actually provided to the date of such termination. The Contractor will not be compensated for any other costs in connection with a termination for non-appropriation. The Contractor will not be entitled to recover any damages in connection with a termination for non-appropriation, including, but not limited to, lost profits. 4. Rights Cumulative The rights and remedies of the County provided in this Section are in addition to any other rights and remedies provided by law or under this Contract. SECTION TWENTY-TW0 Indemnification Except for expenses or liabilities arising from the negligence or intentional acts of the County, the Contractor hereby expressly agrees to indemnify and hold the County harmless against any and all expenses Page 439 of 522 Page 52 of 332 9 and liabilities arising out of the negligent or intentionally wrongful performance, action or inaction of the Contractor in conduct of this Contract, as follows: For matters other than those arising from the rendering or failure to render professional services, the Contractor expressly agrees to the extent that there is a causal relationship between its negligence, action or inaction, or the negligence, action or inaction of any of its employees or any person, firm or corporation directly or indirectly employed by the Contractor and any damage, liability, injury, loss or expense (whether in connection with bodily injury or death or property damage) that is suffered by the County and/or its officers or employees or by any member of the public, to indemnify and save the County and its officers and employees harmless against any and all liabilities, penalties, demands, claims, lawsuits, losses, damages, costs, and expenses arising out of the negligence, action or inaction of the Contractor, regardless of whether such liabilities, penalties, demands, claims, lawsuits, losses, damages, costs and expenses are caused in part by the County. Such costs are to include, without limitation, defense, settlement and reasonable attorney's fees incurred by the County and its employees. This promise to indemnify shall include, without limitation, bodily injuries or death occurring to the Contractor's employees and any person, directly or indirectly employed by the Contractor (including, without limitation, any employee of any subcontractor), the County's officers or employees, the employees of any other independent contractors, or occurring to any member of the public. When the County s ubmits notice, the Contractor shall promptly defend any aforementioned action. For matters arising out of the rendering or failure to render professional services, the Contractor will indemnify and save the County and its officers and employees harmless from and against all liabilities, penalties, demands, claims, lawsuits, losses, d amages, costs and expenses arising out of or resultant from any negligent act, error or omission of the Contractor in the rendering or failure to render professional services under this Contract. Such costs are to include, without limitation, defense, sett lement and reasonable attorneys' fees incurred by the County and its officers and employees. This promise to indemnify shall include, without limitation, bodily injuries or death occurring to the Contractor's employees and any person, directly or indirectly employed by the Contractor (including, without limitation, any employee of any subcontractor), the County's officers or employees, the employees of any other independent contractors, or occurring to any member of the public. When the County submits notic e of a claim that triggers the indemnity, the Contractor shall promptly defend any aforementioned action. The limits of insurance required in this Contract shall not limit the Contractor's obligations under this Section. The terms and conditions contained in this Section shall survive the termination of the Contract or the suspension of the Work hereunder. To the extent that any liabilities, penalties, demands, claims, lawsuits, losses, damages, costs and expenses are caused in part by the acts of the County, the Contractor’s obligations shall be reduced in proportion to the County's fault. The obligations herein shall also extend to any actions by the County to enforce this indemnity obligation. The recovery of costs and fees all extend to those incurred in the enforcement of this indemnity. SECTION TWENTY-THREE Gratuities and Kickbacks Gratuities. It shall be unethical for any person to offer, give or agree to give any employee or former employee, or for any employee or former employee to solicit, demand, accept, or agree to accept from another person a gratuity or an offer of employment in connection with any decision, approval, disapproval, recommendation, preparation or any part of a program requirement or a purchase request, influencing the content of any specification or procurement standard, rendering of advice, investigation, auditing, or in any other advisory capacity in any proceeding or application, request for ruling, determination, claim or Page 440 of 522 Page 53 of 332 10 controversy, or other particular matter pertaining to any program requirement of a contract or subcontract, or to any solicitation or proposal therefore. Kickbacks. It shall be unethical for any payment, gratuity, or offer of employment to be made by or on behalf of a subcontractor under a contract to the prime contractor, or to hire any subcontractor or any person associated therewith, as an inducement for the award of a subcontract or order. Violation of this clause may result in Contract termination. SECTION TWENTY-FOUR Labor: Subcontractors No subcontracts shall be allowed without the prior written approval of the County. The Contractor shall not contract with a proposed person or entity to whom the County has made reasonable and timely objections. The Contractor shall not be required to contract with anyone to whom the Contractor has made reasonable and timely objection. The Contractor shall enforce strict discipline and good order among its employees and other persons carrying out the performance of the Contract. Employment of labor by the Contractor shall be effected under conditions which are satisfactory to the County. The Contractor shall remove or cause to have removed from the project any employee or employees who are considered unsatisfactory by the County. The Contractor assumes the responsibility for assuring that its working forces are compatible with the County employees and the Contractor is responsible for making itself aware of those forces. The Contractor will furnish a competent representative who is to be kept available to represent the Contractor for the purpose of receiving notices, orders and instruction. No substitutions shall be made of such Contractor’s representative without the approval of the County and a replacement by someone with comparable, skills, experience and talent. SECTION TWENTY-FIVE Assignment The Contractor shall not assign in whole or in part the Contract without the prior written consent of the County or its Assignee. The Contractor shall not assign any money due or that may become due to it under said the Contract without the prior written c onsent of the County or its Assignee. Each Party binds itself, its successors, assigns, executors, administrators or other representatives to the other Party hereto and to successors, assigns, executors, administrators or other representatives of such other Party in connection with all terms and conditions of the Contract. SECTION TWENTY-SIX Controlling Law The laws of South Carolina shall govern this Contract. All litigation arising under this Contract shall be litigated only in a nonjury hearing in the Court of Common Pleas, Fourteenth Judicial Circuit, Beaufort County, South Carolina. Page 441 of 522 Page 54 of 332 11 SECTION TWENTY-SEVEN Entire Contract This Contract constitutes the entire understanding and contract between the Parties hereto and supersedes all prior and contemporaneous written and oral contracts between the Parties and their predecessors in interest regarding the subject matter of this Contract. This Contract may not be changed, altered, amended, modified, or terminated orally, except as specifically provided, and any such change, alteration, amendment, or modification must be in writing and executed by the Parties hereto. SECTION TWENTY-EIGHT Severance Should any part of this Contract be determined by a Court of competent jurisdiction to be invalid, illegal, or against public policy, said offending Section shall be void and of no effect and shall not render any other Section herein, nor this Contract as a whole, invalid. Any terms which, by their nature, should survive the suspension, termination or expiration hereof shall be deemed to so survive. SECTION TWENTY-NINE Non-waiver Any waiver of any default by either Party to this Contract shall not constitute waiver of any subsequent default, nor shall it operate to require either Party to waive, or entitle either Party to a waiver of, any subsequent default hereunder. Page 442 of 522 Page 55 of 332 Page 443 of 522 Page 56 of 332 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: RECOMMENDATION TO AWARD A CONTRACT TO APAC ATLANTIC, INC FOR THE SUNSET BLVD / MILLER DRIVE ROADWAY RESURFACING AND TRAFFIC CALMING PROJECT ($739,873.48) MEETING NAME AND DATE: County Council October 12, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval to award contract to APAC Atlantic for the Sunset Blvd / Miller Drive roadway resurfacing and traffic calming project ($739,873.48) PRESENTER INFORMATION: Bryan Bauer, Director of Engineering (5 min) ITEM BACKGROUND: This project is part of the 2018 Sales Tax Program and is governed by an encroachment permit between SCDOT and Beaufort County. Project includes resurfacing of 0.35 miles of Sunset Boulevard (S-186) & Miller Drive West (S-187) Project. (Sunset blvd from Sea Island Parkway to intersection of Miller Drive West and Miller Drive West from Sunset Boulevard to Sam’s Point Road). Traffic calming installation within the project roadways is also included within the scope of work. FISCAL IMPACT: The contract fee for materials and construction is $672,612.25. Staff recommend a contingency of 10% ($67,261.23) bringing the project requested budget to be $739,873.48. The funding for this project is from Account No. 4705-80-0000-S4500-LIMP with a balance of $26,100,000 APPROVAL HISTORY: Resolution 2025/46 Project redefined (by council) July 14, 2025 Page 57 of 332 Beaufort County, SC Procurement David Thomas, Director PO Box 1228, Beaufort, SC 29902 EVALUATION TABULATION IFB No. 082626 Sunset-Miller Resurfacing &Traffic Calming RESPONSE DEADLINE: August 26, 2026 at 3:00 pm Report Generated: Wednesday, August 26, 2026 SELECTED VENDOR TOTALS Vendor Total APAC Atlantic, Inc. $672,612.25 TABLE 1 APAC Atlantic, Inc. Selected Line Item Description Quantity Unit of Measure Unit Cost Total X 1031000 MOBILIZATION 1 LS $52,000.00 $52,000.00 X 1032010 BONDS AND INSURANCE 1 LS $5,000.00 $5,000.00 X 1050800 CONSTRUCTION STAKES, LINES & GRADES 1 EA $10,000.00 $10,000.00 X 2012000 CLEARING & GRUBBING WITHIN ROADWAY 1 LS $23,000.00 $23,000.00 X 2016010 LIMB TRIMMING 1 LS $60,000.00 $60,000.00 X 2025000 REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 180 SY $34.00 $6,120.00 X 2031000 UNCLASSIFIED EXCAVATION 31 CY $200.00 $6,200.00 X 2033000 BORROW EXCAVATION 6 CY $440.00 $2,640.00 Page 58 of 332 EVALUATION TABULATION IFB No. 082626 Sunset-Miller Resurfacing &Traffic Calming EVALUATION TABULATION Invitation For Bid - Sunset-Miller Resurfacing &Traffic Calming Page 2 APAC Atlantic, Inc. Selected Line Item Description Quantity Unit of Measure Unit Cost Total X 2081001 FINE GRADING 186 SY $23.00 $4,278.00 X 2091000 SELECT MATERIAL FOR SHOULDERS & SLOPES 100 CY $78.00 $7,800.00 X 4011004 LIQUID ASPHALT BINDER PG64-22 91 TON $800.00 $72,800.00 X 4012060 FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 500 SY $85.00 $42,500.00 X 4013110 MILLING EXISTING ASPHALT PAVEMENT 1.0" 4459 SY $5.50 $24,524.50 X 4013115 MILLING EXISTING ASPHALT PAVEMENT 1.5" 4877 SY $5.35 $26,091.95 X 4013990 MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 270 SY $52.00 $14,040.00 X 4020320 ASPHALT BASE COURSE - TYPE B 56 TON $200.00 $11,200.00 X 4030330 ASPHALT INTERMEDIATE COURSE TYPE C 33 TON $275.00 $9,075.00 X 4040340 ASPHALT SURFACE COURSE TYPE C 1268 TON $148.00 $187,664.00 X 6011000 TRAFFIC CONTROL 1 LS $71,000.00 $71,000.00 X 6051120 PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 240 SF $10.00 $2,400.00 X 6240010 4" WHITE SOLID LINES (PVT EDGE LINES) - FAST DRY PAINT 9288 LF $0.20 $1,857.60 X 6240015 8" WHITE SOLID LINES (CROSSWALK&CHANNELIZATION)-FAST DRY PAINT 1848 LF $0.20 $369.60 X 6240020 12" WHITE SOLID LINES - FAST DRY PAINT 864 LF $0.30 $259.20 Page 59 of 332 EVALUATION TABULATION IFB No. 082626 Sunset-Miller Resurfacing &Traffic Calming EVALUATION TABULATION Invitation For Bid - Sunset-Miller Resurfacing &Traffic Calming Page 3 APAC Atlantic, Inc. Selected Line Item Description Quantity Unit of Measure Unit Cost Total X 6240025 24" WHITE SOLID LINES (STOP/DIAG LINES)-FAST DRY PAINT 600 LF $1.25 $750.00 X 6240110 4" YELLOW SOLID LINES (PVT. EDGE LINES) FAST DRY PAINT 402 LF $0.20 $80.40 X 6271010 4" WHITE SOLID LINES (PVT EDGE LINES) - THERMO. -90 MIL. 3096 LF $1.00 $3,096.00 X 6271015 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 616 LF $3.75 $2,310.00 X 6271020 12" WHITE SOLID LINES - THERMO. - 125 MIL. 288 LF $5.50 $1,584.00 X 6271025 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL. 200 LF $11.50 $2,300.00 X 6271074 4" YELLOW SOLID LINES (PVT. EDGE LINES) THERMO.-90 MIL. 6465 LF $1.00 $6,465.00 X 6301100 PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 45 EA $12.50 $562.50 X 6510105 FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 134 SF $30.00 $4,020.00 X 6531210 U-SECTION POST FOR SIGN SUPPORTS - 3P 242 LF $12.00 $2,904.00 X 8100101 PERMANENT GRASSING FOR SMALL PROJECTS 1.02 ACRE $4,225.00 $4,309.50 X 8151201 HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 1 0.09 ACRE $12,500.00 $1,125.00 X 8153000 SILT FENCE 381 LF $6.00 $2,286.00 Total $672,612.25 VENDOR QUESTIONNAIRE PASS/FAIL Page 60 of 332 EVALUATION TABULATION IFB No. 082626 Sunset-Miller Resurfacing &Traffic Calming EVALUATION TABULATION Invitation For Bid - Sunset-Miller Resurfacing &Traffic Calming Page 4 Question Title APAC Atlantic, Inc. Certification Pass Contact information of authorized representative? Pass Please Provide Licenses and Certificate of Insurance Pass 100% Labor and Material Payment Bond Pass Bidder Confirmation Pass Communications Pass Are you submitting this bid as a local vendor? Pass Local Vendor Preference - Participation Affidavit Pass Non-Collusion Affidavit of Prime Bidder Pass Will you be using subcontractors? Pass Non-Collusion Affidavit of Subcontractor Pass Certification By Contractor Regarding Non-Segregated Facilities Pass Business Organization Type of Business Organization: Pass If you selected "Other" for your type of business, please explain: Pass If applicable, please provide name of partners and additional information below: Pass If your agency is a Corporation: Pass Are you a Subchapter S Corporation? Pass Please provide Subchapter S Shareholders: No Response If individually owned: Pass Have you ever operated under another name? Pass Page 61 of 332 EVALUATION TABULATION IFB No. 082626 Sunset-Miller Resurfacing &Traffic Calming EVALUATION TABULATION Invitation For Bid - Sunset-Miller Resurfacing &Traffic Calming Page 5 Question Title APAC Atlantic, Inc. Please provide all other business names and addresses of principal place of business for each business: Pass Bonding Bid Bond Pass Please provide the Bonding information: Pass Do you intend to use any alternative form of security Pass Indicate the form of security you intend to use and the name, address, point of contact, and telephone number of the banks, savings and loan, or surety you intend to use. (NOTE: Prequalification will not assure acceptance of any form of security.) No Response Have any Performance or Payment Bond claims ever been paid by any surety on behalf of your organization? Pass State the name of the project(s); the date; the name, address, telephone number, and contact person for the claimant; the surety satisfying the claim; the size of the claim; and the circumstances giving rise to the claim. No Response Have you ever arbitrated or litigated a claim with an Owner, Architect, or Engineer in the last five years? Pass State the name of the project(s); the date; the name, address, telephone number, and contact person for the claimant; the surety satisfying the claim; the size of the claim; and the circumstances giving rise to the claim. (Provide attachments if necessary.) No Response Have you or any officer, partner, or owner of your organization, in any state or territory of the United States, or with respect to any agency of the Federal government: In the last in the last five years, received any fines or citations for building code violations which were unrelated to design? Pass Page 62 of 332 EVALUATION TABULATION IFB No. 082626 Sunset-Miller Resurfacing &Traffic Calming EVALUATION TABULATION Invitation For Bid - Sunset-Miller Resurfacing &Traffic Calming Page 6 Question Title APAC Atlantic, Inc. Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response Ever been found to be guilty of charges relating to conflicts of interest: Pass Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response Ever been convicted on charges related to any criminal activity relating to construction means, methods, or techniques; bidding or bid rigging; or bribery? Pass Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response In the last five years, been found guilty of any minority contracting law violations? Pass Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response In the last five years, pleaded no contest in any criminal proceeding related to contracting? Pass Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response Ever been disbarred from doing Federal, state, or local government work for any reason? Pass Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response Ever been terminated on a contract due to your default? Pass Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response In the last five years, paid liquidated damages for being late on a project? Pass Page 63 of 332 EVALUATION TABULATION IFB No. 082626 Sunset-Miller Resurfacing &Traffic Calming EVALUATION TABULATION Invitation For Bid - Sunset-Miller Resurfacing &Traffic Calming Page 7 Question Title APAC Atlantic, Inc. Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response In the last five years, been subject to tax collection proceedings? Pass Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response In the last seven years, filed for bankruptcy? Pass Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response Under what chapter of bankruptcy did you file? No Response If you filed under Chapter 11 Reorganization, how long did you operate under this status? No Response Are you operating under Chapter 11 status now? No Response Safety Have you, in the last three years, been cited for willful violations for failure to abate, or for repeated violations, by the United States Occupational Safety and Health Administration or by the South Carolina Occupational Safety and Health Administration or by any other governmental body? Pass State date, name, address, telephone number, and contact person for agency issuing citation and the nature of the violation. Also, advise the amount of fines paid, if any. Provide attachments if necessary. No Response List your worker’s compensation experience modifier for the last three years. No Response References Provide at least two references from each industry group listed. Provide other references as requested. Provide current names, addresses, telephone numbers, and contacts. Pass Page 64 of 332 EVALUATION TABULATION IFB No. 082626 Sunset-Miller Resurfacing &Traffic Calming EVALUATION TABULATION Invitation For Bid - Sunset-Miller Resurfacing &Traffic Calming Page 8 Question Title APAC Atlantic, Inc. Certification regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion: The contractor certifies: Pass Explain fully if it has been involved in any litigation involving performance. No Response Small and Minority Business Participation Program Are you a Small or Minority Business ? Pass Upload your Small/Minority Documentation No Response Are you self-performing 100%? Pass Self-Performing 100% Affidavit No Response Good Faith Agencies Distribution List Pass Page 65 of 332 Determination of Price Reasonableness for Solicitation Procurement Services Department Solicitation Details Date/Time:* Aug 31, 2026 3:24 PM Preparer:* Sloan, Robert From:* Sloan, Robert Department:* Engineering Solicitation Number:* IFB - 082626 Purpose:* Sunset Blvd / Miller Drive Resurfacing and traffic calming Background Describe the relevant procurement, including a brief description of the product/service/scope of work.* Resurfacing of 0.35 miles of Sunset Boulevard (S-186) & Miller Drive West (S-187) Project. ( Sunset blvd from Sea Island Parkway to the intersection of Miller Drive West and Miller Drive West from Sunset Boulevard to Sam’s Point Road). “Traffic calming” installation within the project roadways is also included within the Scope of Work. State procurement’s significance to the project or County operations.* This project is part of the 2018 Sales Tax Program and is governed by an intergovernmental agreement and encroachment permit between SCDOT and Beaufort County. Outline the procurement method utilized for this contract: (IFB, RFP, RFQ, Quotes).* On July 24, 2026 Beaufort County published an invitation to bid (IFB 082626) . One bid was received by the deadline of August 26, 2026 and was within expected project cost estimates as determined by a qualified engineering and construction consultant (ICE). https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 1/5 Page 66 of 332 Price Analysis Summarize the bid (s)/quotes (s) received with their respective amounts.* One bid submittal was received from APAC Atlantic Inc. Total Bid was $672,612.25 as compared to Engineers pre-bid estimate of $705,869.64 If applicable: note any previous price history for similar procurements. Beaufort County has used APAC Atlantic previously and have achieved satisfactory results. Comparisons with substantially similar items.* Consultant J. Bragg evaluated the bid as compared to projects of similar scope and size. Sales of the same item to other purchasers.* substantially similar pricing Analysis of the cost elements (e.g. labor rate and estimated hours, material rates, indirect costs, reasonable profit)* project was bid by unit rates 9/1/26, 4:20 PM Nintex Forms for SharePoint Lists https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 2/5 Page 67 of 332 List and explain the benchmarks, market analysis, or other data sources used to evaluate price fairness.* pricing within the ranges of similar project work Justification of Acceptance of Single Proposal/Bid Consideration of re-solicitation? Yes No Consideration of reasons for a single applicant? Yes No Explain: Price proposal was within the expected costs of the project as bid. Consideration of reasonable search for qualified applicants? Yes No Explain: Project was put out for public bid. Cost Analysis (if applicable) Detail the cost elements (labor, materials, overhead, etc.) provided by the supplier or contractor. 9/1/26, 4:20 PM Nintex Forms for SharePoint Lists https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 3/5 Page 68 of 332 Provide an analysis of the necessity and reasonableness of each cost element. Vendor's Pricing Strategy (optional) What is the vendor's pricing strategy? Department Head Decision Comments J. Bragg, the 2018 Sales Tax Program manager, has evaluated the bid and recommended approval. The contractors bid is approximately 7% less than the engineers estimate. Approve Disapprov e Department Head Signature Bauer, Bryan Date/Time Sep 1, 2026 8:12 AM Purchasing Decision 9/1/26, 4:20 PM Nintex Forms for SharePoint Lists https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 4/5 Page 69 of 332 Comments Approve Disapprov e Purchasing Signature Thomas, Dave Date/Time Sep 1, 2026 8:35 AM 9/1/26, 4:20 PM Nintex Forms for SharePoint Lists https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 5/5 Page 70 of 332 Page 71 of 332 Page 72 of 332 Page 73 of 332 Page 74 of 332 Page 75 of 332 Page 76 of 332 Page 77 of 332 Page 78 of 332 Page 79 of 332 Page 80 of 332 Page 81 of 332 Page 82 of 332 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: APPROVAL OF A TASK ORDER TO HDR ENGINEERING, INC FOR THE PRELIMINARY ENGINEERING FOR ALTERATIONS TO THE CHOWAN CREEK BRIDGE APPROACHES ($212,630) MEETING NAME AND DATE: County Council October 12, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval of task order to HDR Engineering, Inc. for the preliminary design and engineering of alterations to the Chowan Creek Bridge in the amount of $212,630. PRESENTER INFORMATION: Bryan Bauer, PE - Director of Engineering (5 min) ITEM BACKGROUND: The Chowan Creek bridge has been noted as a choke point along US 21 on St. Helena Island in emergency situations. The bridge was also identified in the Beaufort County Roadway Vulnerability Study completed in 2025. The project has been included in the 2026 Transportation Sales Tax referendum. This task order will enable the County to begin preliminary engineering and design for alterations to provide congestion relief during emergency situations. The concept will be to restipe the bridge to allow for a center median and widen the approaches on both sides for the additional lane width requirements. HDR Engineers, Inc was one of ten consultants selected in the competitively bid RFQ # 032626 On-Call Transportation Roadway Design. FISCAL IMPACT: The fee for HDR Engineering, Inc. for the preliminary design and engineering of alterations to the Chowan Creek Bridge is $193,300. Staff recommends a 10% contingency of approximately $19,330 for a total of $212,630. Funding for this project is from TAG account number 2342-30-0000-51160 with a balance of $1,868,672.00. APPROVAL HISTORY: Page 83 of 332 hdrinc.com 1201 Main Street, Suite 800, Columbia, SC 29201-3271 (803) 509-6600 September 3, 2026 Bryan Bauer Director of Engineering Beaufort County Engineering 100 Ribaut Road Beaufort, SC 29902 Re: US 21 @ Chowan Creek Preliminary Plans 2026 On-Call Transportation Roadway Design Task Order #1 HDR # 10473069 Dear Mr. Bauer: HDR Engineering, Inc. (HDR) appreciates this opportunity to provide Beaufort County with a proposal to provide engineering services associated with the preliminary plans for the US21 at Chowan Creek widening. Based on the scope of services, deliverables and schedule outlined below, HDR, and its sub- consultant will survey the project, develop preliminary engineering plans, and assist with moving forward. The Scope of Services is outlined below: PURPOSE Beaufort County wishes to obtain preliminary plans for US 21 at Chowan Creek . These modifications include but are not limited to adding a center two way left turn lane (TWLTL) from 750’ south of Chowen Creek Bluff to 500’ north of Warsaw Road. This will include re-striping the existing 510’ long bridge. HDR will coordinate surveys, study the proposed typical section, and develop preliminary plans. Assumptions for the project are as follows: • Preliminary plans will include typical elements from the SCDOT Roadway Design Manual, • Utility coordination will include early utility coordination and contact, but no SUE will be acquired. • Environmental studies will be limited to wetland delineation to evaluate potential impacts. • Typical section studies will be performed to determine lane widths, shoulder widths, and drainage alternatives. Potential design exceptions or variances will be noted but not acquired. • No geotechnical investigations will be conducted regarding these plans. • Survey will occur for 75’ from the existing centerline for a length of 75’. No underwater survey will be conducted. • Plans will be provided to County review 3 months from NTP. For this proposal, HDR Engineering Inc. will be referred to as the CONSULTANT. McKim and Creek will be referred to as the SUBCONSULTANT . The widening plans will be referred to as the PROJECT , and Beaufort County, SC will be referred to as the CLIENT. Docusign Envelope ID: B08FEC3B-167F-8A95-80B0-151ED0500083 Page 84 of 332 Page 2 of 5 Scope of Services 1. PROJECT MANAGEMENT The CONSULTANT will coordinate with the CLIENT to prepare a schedule for the proposed project. Coordination meetings will occur monthly during the life of the project. The CONSULTANT will coordinate with the CLIENT for ny specific design standards. Invoicing will occur monthly. The CONSULTANT will coordinate with the SUBCONSULTANT for survey needs. 2. SURVEYS Field surveys will be performed to determine accurate elevations and locations of existing facilities, e.g., roadways, bridges, culverts, utilities, and other physical feature needed for design and to provide ground controls for all design surveys. Surveys along the entire project will include the items listed below: 1. All surveys will be based on SC State Plane Coordinate System using NAD-83 and elevations on NAVD 1988 datum. 2. Survey Control Points shall be distributed throughout the project at 500-foot intervals. Survey control points shall be inter-visible from two other survey control points. A minimum of 4 survey control points shall be established along the survey corridor and shall be established outside the physical limits of disturbance. 3. Survey existing centerline alignment of US-21. 4. Cross-sections will be taken at 50’ intervals from the existing roadway centerline to 75’ left and right for 3,000’ US-21. 5. Locate all planimetric features such as edge of pavement, structures, utilities, residential trees, residential shrubs, tree lines, streams, fences, driveways, and mailboxes from the centerline to 75’ left and right. Locate all specimen trees as required by the County. Surveyor shall contact PUPS 811 design location service to mark all utility lines. The surveyor will be provided with existing utility and right of way plans prior to beginning survey work if available. Surveyor shall locate marked existing utilities and utility ROW based on plans, if provided. 6. Locate all drainage and sanitary sewer structures from the centerline to 75’ left and right. Locate the system upstream, whether a ditch or pipe. All pipes shall be located and elevations, types, and size shall be provided. 7. Horizontally and vertically locate all potential outfall drainage ditches and streams. At all outfalls obtain cross-sections 100 feet upstream and/or 100 feet downstream using a 40’ corridor (20’ on either side of the ditch centerline). 8. Public records research of all properties (approximately 10 tracts) that may be impacted by the construction of the proposed project will be conducted. Where available in the public record, the current owner’s name, address, tax map number, total area of parcel, and corresponding Plat Book with page and/or Deed Book with page Number(s) for the property owners as listed on the Tax Assessor’s records will be provided. This information will be provided to the COUNTY in the form of a Microsoft Excel, with one copy each of the electronic and hardcopy versions of the file. Search and survey all detectable property corners and pins of tracts that may be impacted. The location and bearings of property lines intersecting the proposed right of way will be determined by surveyed corners or by data from available records where corners cannot be found. Information used to compute property lines will be limited to data that is part of the public Docusign Envelope ID: B08FEC3B-167F-8A95-80B0-151ED0500083 Page 85 of 332 Page 3 of 5 record. This property strip map is considered a partial survey and does not constitute a full boundary survey. 9. An electronic property strip map which will include the names of property owners and their tax map number and will be prepared in Openroads format. 3. ROADWAY DESIGN Design will be completed in accordance with the policies and practices of SCDOT as described in the SCDOT Roadway Design Manual and Standard Specifications for Road Construction. Items not covered by these sources will be as provided by the American Association of State Highway and Transportation Officials (AASHTO). Plans will be developed at a 1”=20’ scale. 1. Preliminary Plans Preliminary plans will be developed by the CONSULTANT to illustrate the alignment, grades, cross sections, construction limits, relevant dimensions, and location of existing features and proposed improvements. A typical section of the proposed improvements will be pr epared to provide the standard section of improvement, pavement types and application rates, cross slopes, and limits of improvement. The plan, profile, and cross section sheets will show information necessary to permit construction stakeout and to indicate and delineate details necessary for construction. 2. Design Refinement & Comment Resolution Comments generated by the CLIENT’s review of the preliminary plans will be consolidated into a matrix to track the resolution of comments. The CONSULTANT will revise the project design and resubmit the plans in accordance with the accepted resolution to each comment generated by the CLIENT. Deliverables: Preliminary plans will be provided electronically in PDF format. 4. DRAINAGE DESIGN The CONSULTANT will develop drainage calculations, as necessary to facilitate preliminary plans. The stormwater design will be prepared in accordance with the SCDOT Requirements for Hydraulic Design Studies manual dated May 26, 2009. The CONSULTANT will review the stormwater runoff for quantity and quality and make recommendations based on potential impacts. The CONSULTANT will not include a stormwater permit application. The locations of proposed drainage features will be shown on the roadway plan sheets. Deliverables: Drainage calculations and plans will be provided in PDF format. 5. ENVIRONMENTAL The CONSULTANT will not include obtaining any permits needed to construct the project. Only wetland delineation and threatened and endangered (T&E) habitat surveys will occur. GPS located wetlands will be shown on the plans. Deliverables: Wetland delineation survey and T&E Survey Memo. Docusign Envelope ID: B08FEC3B-167F-8A95-80B0-151ED0500083 Page 86 of 332 Page 4 of 5 6. UTILITY COORDINATION Preliminary utility coordination will occur with the appropriate utility owners by contacting them and reviewing documents provided. We assume that up to five utilities will be within the project limits. They will be contacted during the development of preliminary design plans. We assume that up to two field visits will be necessary during preliminary utility coordination. A preliminary report containing an assessment of the effected utility owners and a review of their possible prior rights will be submitted to the CLIENT. Deliverables: Preliminary Utility Contact Report will be provided in PDF format. Items Not Included In Scope • Geotechnical Engineering • Pavement Design • Subsurface Utility Engineering (SUE) • Utility Relocation Design • Environmental Resource Surveys (Haz-Mat, Cultural Resources) • Wetland Permitting • Right of Way Staking • Right of Way Acquisition • Construction Engineering and Inspection • Permitting Fees SCHEDULE Survey will be completed within one ( 1) month of NTP. Submittal of the preliminary plans to the CLIENT will be two (2) months from completion of the survey. FEE HDR proposes to perform the tasks described in this proposal as outlined below: Task 1 PROJECT MANAGEMENT $ 29,900.00 (122 manhours) Task 2 SURVEYS $ 39,800.00 (16 manhours) Task 3 ROADWAY DESIGN $ 67,700.00 (340 manhours) Task 4 DRAINAGE DESIGN $ 30,500.00 (204 manhours) Task 5 ENVIRONMENTAL $ 9,200.00 (66 manhours) Task 6 UTILITY COORDINATION $ 16,200.00 (64 manhours) Total $ 193,300.00 (812 manhours) Docusign Envelope ID: B08FEC3B-167F-8A95-80B0-151ED0500083 Page 87 of 332 Page 5 of 5 Once again, HDR appreciates this opportunity to provide assistance to the Beaufort County. We look forward to working with you on this project. Please call 803-509-6626 with any questions or comments you may have. Sincerely, HDR ENGINEERING, INC. __________________________ Phillip Hutcherson, P.E. Project Manager ________________________ Jennifer Mustar, P.E. VP South Carolina Area Manager Docusign Envelope ID: B08FEC3B-167F-8A95-80B0-151ED0500083 Page 88 of 332 Page 1 of 2 1. CONTRACT NAME AND NUMBER 2. TASK ORDER NO.: 3. EFFECTIVE DATE: On Call Transportation Engineering Services (Design) RFQ 032626 FY27 Chowen Creek September 3, 2026 TASK ORDER FOR SERVICES 4. CONTRACTOR NAME, ADDRESS, PHONE, AND EMAIL: HDR 1201 Main Street, Suite 800, Columbia, SC 29201 803-509-6600 Phillip Hutcherson Phillip.Hutcherson@hdrinc.com 5. ISSUED BY: Beaufort County Procurement Services PO Drawer 1228 Beaufort, SC 29901 For Questions Contact: Gillian Murray Senior Buyer (843) 255-2295 Email: gmurray@bcgov.net 6. PROJECT NAME/TITLE AND DESCRIPTION: US 21 @ Chowen Creek Preliminary Plans Task 1: Project Management Task 2: Surveys Task 3: Roadway Design Task 4: Drainage Design Task 5: Environmental Task 6: Utility Design 7. OTHER PERTINENT INFORMATION OR SPECIAL CONSIDERATIONS: This task order is issued pursuant to the Scope and Fee Proposal dated September 3, 2026 and attached. 8. PAYMENT TYPE: Contractor will be paid on a percentage complete basis with the submission of monthly invoices 9. LIQUIDATED DAMAGES N\A 10. NUMBER OF DAYS/MONTHS TO COMPLETE PROJECT 3 Months after issuance of Notice to Proceed. No work shall begin prior to issuance of Notice to Proceed 11. TOTAL AWARD AMOUNT: $193,300.00 12. Project Manager’s Name Bryan Bauer Project Manager’s Email frederick.bauer@bcgov.net Project Manager’s Phone 843-255-2706 Docusign Envelope ID: 0AEF5F96-6FDC-89E2-80E4-D8C2C9FD99B2 Page 89 of 332 Page 2 of 2 12. AUTHORIZED SIGNATURE FOR THE VENDOR: a. SIGNATURE: b. NAME/TITLE OF SIGNER: c. DATE SIGNED: 13. AUTHORIZED SIGNATURE FOR THE COUNTY a. SIGNATURE b. NAME/TITLE OF SIGNER c. DATE SIGNED Docusign Envelope ID: 0AEF5F96-6FDC-89E2-80E4-D8C2C9FD99B2 9/4/2026 Jennifer G. Mustar Vice President Page 90 of 332 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: OMNIA CONTRACT AWARD FOR ST. HELENA ISLAND LIBRARY LED RETROFIT ($200,000). MEETING NAME AND DATE: County Council October 12, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends the approval of the Omnia contract for Graybar Electric in the amount of $200,000. PRESENTER INFORMATION: Ron Lewis, Senior Project Manager, 5 min. ITEM BACKGROUND: The interior lighting system at St. Helena Library is very complex and in need of repair; the parts are obsolete and no longer available. Completing an LED lighting retrofit is the only solution available to restore the interior lighting to working condition. Two local and one national vendors declined to provide a proposal due to the complexity of the project. We were able to secure one proposal with Graybar through an Omnia based contract. FISCAL IMPACT: The contract amount is $189,000, staff recommends $11,000 for contingency; bringing the total cost to $200,000. The funding source will be the 2025 GL Bond GL account # 4013-80-1310-54420 which has the account balance of $100,000; and Repairs to Buildings GL account # 1000-30-1310-51130 which has the account balance of $3,000,000. APPROVAL HISTORY: N/A Page 91 of 332 Omnia Contract Qty Type Mfg Model Number & Notes Lead Time 1 INCLUDED RETROFIT/UPGRADE LIGHTING FIXTURES. (INTERIOR). MATERI ALS/LABOR/EQUIPM ENT DISPOSAL - - - Omnia Contract Subtotal $189,000.00 Grand Total $189,000.00 Project Notes: Note: this will be performed utilizing the Omnia Contract Graybar to co-ordinate project upon award. Dominion Rebate to be provided through Graybar and 100 % of rebate to be paid to Beaufort County . Job Name : St. Helena Library lighting Upfit Quote Number : 485114-969412-1 Bid Date : May 28, 2026 Expiration Date : Jun 27, 2026 Quote Start 1 Page 92 of 332 General Terms & Conditions Graybar Standard Terms and Conditions Apply. https://www.graybar.com/standard-terms-and- conditions Job Name : St. Helena Library lighting Upfit Quote Number : 485114-969412-1 Bid Date : May 28, 2026 Expiration Date : Jun 27, 2026 Quote Start 2 Page 93 of 332 Page 94 of 332 Page 95 of 332 Page 96 of 332 Page 97 of 332 Page 98 of 332 Page 99 of 332 Page 100 of 332 Page 101 of 332 Page 102 of 332 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: RECOMMENDATION FOR APPROVAL OF A CHANGE ORDER WITH KIMLEY HORN FOR A PHASE 2 ENVIRONMENTAL SITE ASSESSMENT (ESA) ON THE LADYS ISLAND DRIVE TURN LANE AT RIBAUT ROAD PROJECT ($42,350) MEETING NAME AND DATE: County Council October 12, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommend approval of a change order with Kimley Horn for a Phase 2 ESA on the Ladys Island Drive at Ribaut Road project. ($42,350) PRESENTER INFORMATION: Bryan Bauer, Director of Engineering (5 Min) ITEM BACKGROUND: The task order with Kimley Horn for design services of a right turn lane on Ladys Island Drive to Ribaut Road requires right of way from the adjacent property where a gas station was previously operated. The Phase 1 Environmental Site Assessment found that contamination is likely, which requires a Phase 2 ESA to determine the extent of the contamination and potential mitigation. FISCAL IMPACT: The change order for the Phase 2 ESA is $38,500. Staff recommends a 10% contingency of $3,850, bringing the total approved budget increase to $42,350. Funding for this task order will be from Impact Fees North account 2300-30-0000-54500-12303 with a balance of $4,900,000.00. APPROVAL HISTORY: The task order with Kimley Horn for design services of a turn lane on Ladys Island Drive at Ribaut was approved by PFC on March 16, 2026. Page 103 of 332 Page 5 kimley-horn.com 1080 Morrison Drive, Suite 240, Charleston, SC 29403 843-737-6390 access to all areas of the site and that the site reconnaissance shall be conducted as a single event. Should an additional site reconnaissance be required due to access limitations, the additional site reconnaissance shall be considered additional services. We assume one day to complete the reconnaissance of the Subject Property. Interviews Consistent with ASTM E 1527-21, 10.5.2.3 and 10.5.4, Kimley-Horn will make a reasonable attempt to conduct the following interviews: 1. Kimley-Horn will attempt to interview current and past owners, operators and occupants of the property that have or are likely to have material information regarding uses, physical characteristics, and the potential for recognized environmental conditions (RECs) at the subject property consistent with ASTM E 1527-21 sections 10.5.1, 10.5.2, 10.5.2.1, 10.5.2.2, and 10.5.4. 2. In the case of abandoned properties as defined in ASTM E 1527-21, 3.2.1, where there is evidence of uncontrolled access or unauthorized uses, Kimley-Horn will attempt to interview current neighboring or nearby property owners (ASTM E 1527-21, 10.5.5). 3. Kimley-Horn will attempt to interview one or more of the following state or local agencies: a. Local fire department b. Local health agency c. Local environmental regulatory agency Report Preparation Upon completion of the tasks, Kimley-Horn will prepare a summary report of the results of the Phase I ESA. Kimley-Horn will provide the report to the Client in electronic format (PDF). Kimley-Horn will prepare a separate cover letter to accompany the Phase I ESA Report. The cover letter will include recommendations based on the findings of the Phase I ESA. Task 8 – Phase II Environmental Site Assessment (If Required) The Subject Property has historically been used as a fuel station. As such, we assume that a Phase I ESA may reveal evidence of recognized environmental conditions that would warrant completion of a Phase II ESA to confirm whether localized contamination is present. The following Phase II ESA scope of services is based on our current knowledge of potential contamination concerns for the Subject Property. It may be necessary to adjust the scope of services pending the results of the Phase I ESA. If that is the case, Kimley-Horn will discuss the proposed changes and corresponding costs with the Client prior to initiating the Phase II ESA. Soil and Groundwater Sampling Kimley-Horn will collect representative soil and groundwater samples from the Subject Property to determine whether historical activities have contributed to localized contamination. We assume up to Page 104 of 332 Page 6 kimley-horn.com 1080 Morrison Drive, Suite 240, Charleston, SC 29403 843-737-6390 20 soil samples and 5 groundwater samples will be collected from the Site. The actual number of samples to be collected from the Site will be contingent upon the findings of the Phase I ESA. We will engage a drilling sub-consultant to install up to 20 soil borings and 5 temporary monitoring wells to facilitate the soil and groundwater sampling. The soil borings and monitoring wells will be installed using direct-push technology (DPT). The soil borings will be advanced to a maximum depth of 12 feet below land surface (bls). Continuous soil samples will be collected from the land surface to the termination depth at each borehole. The soil samples will be screened on two-foot intervals for the presence of volatile organic compounds using a photoionization detector (PID). One soil sample will be retained for laboratory analysis from each soil boring based on the results of the PID screening. Lithologic logs will be prepared for each soil boring. The temporary monitoring well will be installed to a maximum depth of 30 feet bls, depending on the depth at which groundwater is encountered. If groundwater is not encountered within 30 feet of the land surface, monitoring wells will not be installed on the property. The temporary monitoring wells will be constructed of 1-inch diameter, schedule 40 PVC casing with 10-feet of machine slotted well screen. Individual monitoring well construction logs will be prepared for each temporary monitoring well. Kimley-Horn will use low-flow techniques to collect groundwater samples from each monitoring well. Pursuant to state regulations, Kimley-Horn will notify and obtain approval from the South Carolina Department of Environmental Services (SCDES) to install and sample temporary monitoring wells on the Subject Property. The Client acknowledges that in accordance with state regulations, Kimley-Horn will forward copies of the well construction logs and groundwater analytical data to SCDES upon completion of the Phase II ESA. All field activities will be performed in general accordance with the SCDES Standard Operating Procedures (SOP). The northing and easting coordinates and approximate land surface elevation of the soil borings and temporary groundwater monitoring wells will be surveyed with a handheld GPS unit. The soil and groundwater samples collected from the Subject Property will be analyzed for one or more of the following parameters: x Arsenic, barium, cadmium, chro mium, lead, mercury, selenium, and silver (8 RCRA Metals) by EPA Method 6010 and 7000 series x Volatile organic compounds (VOCs) by EPA Method 8260 x Semi-volatile organic compounds (SVOC) by EPA Method 8270 If the groundwater screening samples are turbid, Kimley-Horn will collect both total and dissolved metals samples for analysis. The dissolved metals samples will be filtered by the laboratory. The soil and groundwater samples collected by Kimley-Horn will be analyzed by a laboratory accredited by the NELAC Institute and certified by the state of South Carolina. Sample analysis is anticipated to be on the laboratories normal 10 to 14-day turnaround time. All soil borings and temporary monitoring wells will be abandoned following the completion of the sampling activities. The soil borings will be abandoned using soil cuttings and bentonite. Similarly, the Page 105 of 332 Page 7 kimley-horn.com 1080 Morrison Drive, Suite 240, Charleston, SC 29403 843-737-6390 temporary monitoring well casings and screens will be removed from the ground and the corresponding boreholes will be abandoned with soil cuttings and hydrated bentonite. Phase II ESA Report Kimley-Horn will prepare a Phase II ESA Report upon receipt of the soil and groundwater analytical data from the laboratory. The purpose of the Phase II ESA is to determine whether the historical use of the Subject Property have contributed to localized soil or groundwater impacts. As such, the report is not intended to delineate the full extent of contamination, if present. The report will include a summary and interpretation of the analytical data. The Phase II ESA report will include the following: x Written narrative of the sampling methodology x Summary of the data quality objectives x Tabular summaries of the soil and analytical data x An interpretation of the analytical data x Maps depicting the sample locations and analytical data x Soil boring logs x Monitoring well construction logs x Laboratory data sheets The Phase II ESA report will include our recommendations based on the results of the soil and groundwater quality data. We will provide the client with one copy of the report in electronic (PDF) format. Task 9 – Meetings and Coordination Kimley-Horn will coordinate, facilitate, and document up to four (4) meetings with Beaufort County Staff. The meetings are assumed to be in person at Beaufort County offices and consist of two (2) Kimley-Horn personnel. Task 10 – Survey and Subsurface Utility Exploration (SUE) – By Others At the direction of the Client, Kimley-Horn will contract with Atlas to provide survey and SUE coordination services. Kimley-Horn will coordinate and manage the effort of the survey and SUE subconsultant(s) as described in the attached proposals provided by the subconsultant(s). Kimley- Horn will endeavor to coordinate the subconsultants’ scope of work, schedules, and provide a cursory review of their deliverables on behalf of the Client. The Client/Owner acknowledges that Kimley-Horn will not be reviewing the work product of Subconsultant(s) in detail and will not be liable for it in any way. If the Client has any future claim related to these services, Client will pursue Subconsultant directly and not Kimley-Horn. Task 11 – Utility Coordination – By Others At the direction of the Client, Kimley-Horn will contract with Triton Utility Coordinating to provide utility coordination services. Kimley-Horn will coordinate and manage the effort of the utility coordination subconsultant(s) as described in the attached proposals provided by the subconsultant(s). Kimley- Page 106 of 332 Page 9 kimley-horn.com 1080 Morrison Drive, Suite 240, Charleston, SC 29403 843-737-6390 FEE AND BILLING Kimley-Horn will perform the services listed above for the fee below. All permitting, application, and similar project fees will be paid directly by the Client. Task Fee Type Fee Task 1 – Capacity Analysis Lump Sum $5,525 Task 2 – Roadway Design Lump Sum $25,985 Task 3 – Drainage Design and Report Lump Sum $18,525 Task 4 – Signal Design Lump Sum $11,675 Task 5 – Permitting Lump Sum $18,275 Task 6 – Opinion of Probable Construction Cost (OPCC) Lump Sum $3,335 Task 7 – Phase 1 ESA Lump Sum $5,620 Phase 1 ESA Expenses Lump Sum $6,500 Task 8 – Phase 2 ESA (If Required) Lump Sum $13,500 Allowance for Phase II ESA Drilling and Laboratory Subcontractor Expense Lump Sum $25,000* Task 9 – Meetings and Coordination Lump Sum $7,175 Task 10 – Survey and SUE - by Others Lump Sum $21,900 KH Survey subconsultant Coordination Lump Sum $3,730 Task 11- Utility Coordination – by others Lump Sum $20,000 KH Utility subconsultant Coordination Lump Sum $2,960 Total Without Task 8 $151,205 Total with Task 8 $189,705 *An allowance has been provided for general budgetary purposes for the laboratory and drilling sub- consultant expense for the Phase II scope of work. Actual fees will be dependent on the number of borings needed. Once those have been identified, Kimley-Horn will coordinate with the boring subconsultant for a proposal for the exact scope of work. Kimley-Horn will then add a 15% markup to cover administrative efforts. The Client can elect to contract with the boring subconsultant directly for this scope of work to avoid this markup. Lump sum fees will be invoiced monthly based upon the overall percentage of services performed. Payment will be due within 25 days of your receipt of the invoice and should include the invoice number and Kimley-Horn project number. CLOSURE In addition to the matters set forth herein, our Proposal shall include and be subject to, and only to, the terms and conditions in the attached modified Standard Provisions, which are incorporated by Page 107 of 332 Phase I Environmental Site Assessment Lady’s Island Site Project No. 012716030 5 1.0 EXECUTIVE SUMMARY Kimley-Horn and Associates, Inc. (Kimley-Horn) was retained by Beaufort County Engineering (the “Client”) to conduct a Phase I Envi ronmental Site Assessment (ESA) for an approximate 0.6-acre parcel (PIN # R110 009 000 0031 0000) located within Lady’s Island, Beaufort County, South Carolina (referred to herein as the “Site” or “Subject Property”). This Phase I ESA was performed in general accordance with (1) the United States Environmental Protection Agency (USEPA) Standards and Practices for All Appropriate Inquiries (AAI), 40 CFR Part 312 and (2) guidelines established by the American Society for Testing and Materials (ASTM) in the Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process/Designation E1527-21 (ASTM Standard Practice E1527-21). The ESA was conducted under the supervision or responsible charge of Mr. Ben Lawson, Environmental Professional. The Phase I ESA summary is provided below. Specific details were not included or fully developed in this section, and the Phase I ESA must be reviewed in its entirety for a comprehensive understanding of the results. This report represents our services as of the report date and constitutes our final document; its text may not be altered after final issuance. Findings in this report are based upon the Subject Property’s current utilization; information derived from the most recent reconnaissance and from other activities described herein; such information is subject to change. Certain indicators of the presence of hazardous substances or petroleum products may have been latent, inaccessible, unobservable, or not present during the most recent reconnaissance and may subsequently become observable (such as after property renovation or development). Further, these services are not to be construed as legal interpretation or advice. Viability of this report is subject to ASTM E1527-21 Section 4.6. As listed in Section 4.6 of the ASTM Standard Practice E1527-21, an environmental site assessment meeting or exceeding this practice is presumed to be viable when it is conducted within 180 days prior to the date of acquisition or transaction of the Subject Property. Table 1.0-1 Summary Phase I ESA Component Dates Component Date Interviews User Questionnaire was sent to Mr. Bryan Bauer and Ms. Pamela Bernard with Beaufort County, on June 9, 2026. Ms. Bernard completed the User Questionnaire on June 26, 2026 Property Owner Interview Questionnaire was sent to Mr. Bryan Bauer and Ms. Pamela Bernard with Beaufort County, on June 9, 2026, for coordination with the current property owner. Ms. Bernard completed the Property Owner Interview Questionnaire on June 26, 2026. Review of Government Records May 19, 2026 Visual Inspection May 20, 2026 Declaration by Environmental Professional July 2, 2026 Subject Property Description and Use The Subject Property is located in Lady’s Island in Beaufort County, South Carolina. The Site is currently utilized as a cleared and graded lot. The approximately 0.6-acre Subject Property is composed of one parcel (PIN#: R110 009 000 0031 0000) currently owned by Drayton-Parker Companies, LLC. Information was obtained from the Beaufort County Parcel Search (accessed June 1, 2026) and is attached in Appendix F. However, according to the current property owner interview, the parcel is owned by Beaufort County. The Subject Property is currently zoned as T4 - Urban Center under the Town of Porty Royal. The Subject Property is located within the Beaufort, Page 108 of 332 Phase I Environmental Site Assessment Lady’s Island Site Project No. 012716030 6 Parris Island, and Fort Fremont, South Carolina United States Geological Survey (USGS) 2024, 7.5-minute topographic quadrangle maps presented in Figure 2. Historical Information Historical aerial photographs indicate that the Subject Property was established primarily as agricultural land with a portion of forested land along the western boundary prior to 1951. By 1968, the Site is primarily composed of forested land. By 1994, a gas station was constructed in the center of the Site with a portion of forested land along the eastern boundary. No significant changes were observed between 1994 and 2023. According to the Site reconnaissance, between 2023 to present day, the gas station was removed. Prior to 1951, the Subject Property vicinity was primarily composed of agricultural land, with scattered single-family homes, commercial buildings, pockets of forested land, marsh land, and the Beaufort River. Additionally, Ribaut Road, Johnny Morrall Circle, and the Naval Base were established prior to 1951. By 1968, multiple commercial properties were developed to the north, and a multi-family residential neighborhood was constructed to the west. Between 1968 and 1983, commercial properties continued to be developed to the north, and all agricultural fields were revegetated in all directions. Additionally, Ladys Island Drive was constructed to the east, multiple commercial properties were developed to the south, and multiple single-family homes and commercial properties were developed to the west. By 1994, multiple docks were constructed along the Beaufort River, and multiple commercial properties were developed to the east. By 2006, multiple commercial properties were developed to the west. By 2011, multiple commercial properties were developed to the south. By 2015, Ladys Island Drive expanded to a 4-lane road. No significant changes were observed between 2015 and 2023. Records Review Kimley-Horn reviewed select federal and state environmental regulatory databases, as well as responses from state and local regulatory agencies. Review of these databases and responses did identify a REC associated with the Subject Property. Table 1.0-2 Summary of Record Review Dates Records Reviewed Date of Review Results of Review Historical Aerials May 12, 2026 x No RECs, HRECs, or CRECs x BERs identified Topographic Maps May 11, 2026 x No RECs City Directories May 12, 2026 x No RECs Sanborn Fire Insurance Maps May 11, 2026 No fire insurance maps are available for the Subject Property. Interviews User Questionnaire was sent to Mr. Bryan Bauer and Ms. Pamela Bernard with Beaufort County, on June 9, 2026. Ms. Bernard completed the User Questionnaire on June 26, 2026 Property Owner Interview Questionnaire was sent to Mr. Bryan Bauer and Ms. Pamela Bernard with Beaufort County, on June 9, 2026, for coordination with the current property owner. Ms. Bernard completed the Property Owner Interview Questionnaire on June 26, 2026. Government Officials: FOIA request May 19, 2026 x REC identified Site Recon May 21, 2026 x REC identified x BERs identified Page 109 of 332 Phase I Environmental Site Assessment Lady’s Island Site Project No. 012716030 7 Site Reconnaissance On May 21, 2026, Ms. Skylar Cole Kimley-Horn, under the supervision of Mr. Ben Lawson, PWS, qualified environmental professional, visited the Subject Property. Ms. Cole was not escorted during the completion of site reconnaissance of the Subject Property. No interior observations were made during the completion of this Phase I ESA as part of this investigation. A summary of exterior observations from the site reconnaissance are as follows: x The Site was observed to be primarily composed of a cleared and graded lot. x Three monitoring wells were observed within the Site. x Overhead powerlines and pole-mounted transformers were observed transecting the northern boundary of the Site. The pole-mounted transformers appeared to be corrosive. x One closed drum labeled “non-hazardous waste” was observed within the eastern portion of the Site. The contents inside are unknown, however no leaking, soil staining, or odor was observed. Kimley-Horn did identify a REC associated with three monitoring wells located within the Subject Property during the site reconnaissance. Adjoining Properties The Subject Property is bordered to the north by a maintained roadway (Johnny Morrall Cir) followed by a religious facility. The Site is bordered to the west by a maintained roadway (Ribaut Road) followed by commercial developments. The Site is bordered to the south by a maintained roadway (Ladys Island Dr) followed by commercial developments. The Site is bordered to the east by commercial developments. Opinions and Conclusions Kimley-Horn has performed a Phase I Environmental Site Assessment (ESA) in conformance with the scope and limitations of ASTM Practice E1527-21 for the approximately 0.6-acre property (PIN# R110 009 000 0031 0000) located within Lady’s Island, Beaufort County, SC, the Subject Property. This assessment has revealed no controlled recognized environmental conditions or historical recognized environmental conditions in connection with the Subject Property. The following Recognized Environmental Conditions (RECs) were identified in association with the Subject Property: x During the site reconnaissance, three monitoring wells were observed within the Subject Property. The monitoring wells appear to be in connection with the remediation of EDR record Piedmont Petroleum Corp / Happy Mart #33 (Exxon) / Parkers 76 located within the Subject Property. The Subject Property is listed as a historical gasoline service station with multiple UST leaks and groundwater contamination. The EDR database search has limited information on the status of the monitoring wells or the status of the remediation efforts. The Client provided Kimley-Horn with a prior Limited Phase 2 ESA where further coordination with SCDHEC (now SCDES) was recommended. Due to the known Site contamination, the unknown status of the morning wells and remediation effort, and the potential requirement to close and/or relocate the monitoring wells, the Subject Property is considered a REC. x EDR record NAVSUPPFAC Beaufort SC/ US Naval Hospital is located approximately 0.046-miles south of the Subject Property and approximately 0.407-miles southeast of the Subject Property. The NAVSUPPFAC Beaufort SC/ US Naval Hospital is recorded for multiple UST leaks. Due to the known contamination and the proximity to the Subject Property, the facility is considered a REC for the Subject Property. Page 110 of 332 Phase I Environmental Site Assessment Lady’s Island Site Project No. 012716030 8 The following Business Environmental Risks (BERs) were identified in association with the Subject Property: x Portions of the Site have been historically utilized for agricultural purposes from prior to 1951 until prior to 1961. The historical land uses presumably included the legal and common application of herbicides, fertilizers, and/or pesticides for crop cultivation. The legal application of these compounds over time can result in localized impacts to the soil and/or groundwater. There was no evidence observed during the site reconnaissance to indicate that these compounds had been improperly applied to the Site. Earthwork or soil disturbance associated with future uses may uncover or expose original soil. Based on historical land use, the potential for agrichemicals to be present in the soil and groundwater is considered a BER. x A drum labeled “non-hazardous waste” was observed in the eastern portion of the Site. The drum appeared to closed and no leaking, soil staining, or odor was observed. However, due to the exact contents and duration of the material remaining unknown, the drum is considered a BER. x Evidence of overhead powerlines and associated pole-mounted transformers observed along the northern boundary of the Site. The utilities may need to be moved or relocated as part of development within the Site. Additionally, during the site reconnaissance, majority of the pole mounted transformers appeared to be corrosive and may warrant further investigation. The overhead powerlines and pole-mounted transformers are considered a BER. Page 111 of 332 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: 2026/43: AN ORDINANCE TO AMEND ORDINANCE 2026/29 TO AUTHORIZE THE TRANSFER OF FUNDS. THE VOTE AT THE FINANCE, ADMINISTRATION, AND ECONOMIC DEVELOPMENT COMMITTEE ON AUGUST 17, 2026 - 9:0 THE VOTE AT FIRST READING ON SEPTEMBER 14, 2026 - 9:1 THE VOTE AT SECOND READING AND PUBLIC HEARING SEPTEMBER 28, 2026 - 6:4 MEETING NAME AND DATE: County Council October 12, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Recommend for approval. PRESENTER INFORMATION: Mike Moore, County Administrator (10 minutes) ITEM BACKGROUND: Language authorizing the transfer of funds was removed from the FY27 Budget Ordinance. This means that no movement of funds between departments or within the CIP funds can occur without Council approval. There are currently several CIP projects that are on hold until additional funding can be approved. There are many projects that are complete with project savings available to provide funding for these projects. Staff have provided three options that would restore authority to approve budget transfers for the County Administrator or CFO. The approval of one of these options would allow staff to continue work on these projects. FISCAL IMPACT: N/A APPROVAL HISTORY: The vote at the Finance, Administration, and Economic Development Committee on August 17, 2026 - 9:0 The vote at First Reading on September 14, 2026 - 9:1 The vote at Second Reading and Public Hearing September 28, 2026 - 6:4 Page 112 of 332 ORDINANCE 2026/ AN ORDINANCE TO AMEND BEAUFORT COUNTY’S BUDGET ORDINANCE FOR FISCAL YEAR 2027 (ORDINANCE 2026/29) TO AUTHORIZE THE TRANSFER OF FUNDS. WHEREAS, the Beaufort County Council (“Council”), pursuant to the authority granted by the Constitution of the State of South Carolina and the General Assembly of the State of South Carolina, has the authority to provide for the issuance and sale of general obligation bonds; and WHEREAS, on June 22, 2026, County Council adopted Ordinance 2026/29, which set the County’s FY2027 budget and associated expenditures; and WHEREAS, a motion was made to amend the proposed FY2027 budget ordinance at the County Council meeting on May 26, 2026, to remove language from section VIII of the ordinance that would authorize the County Administrator to transfer funds; and WHEREAS, County Council desires to amend the FY2027 Budget Ordinance 2026/29 to authorize the County Administrator with the recommendation of the CFO, to transfer appropriations between departments (from one department to another) and within the County’s General Fund, Capital Projects Fund, and Capital Improvements Fund, excluding all Enterprise Funds, provided a single transfer does not exceed $200,000, the transfer does not increase the total overall budget of the fund, the transfer does not establish a new capital project, and the transfer does not eliminate or materially change the scope, purpose, or intended outcome of a project; and NOW, THEREFORE, BE IT ORDAINED BY BEAUFORT COUNTY COUNCIL that the FY2027 Beaufort County Budget Ordinance 2026/29 is amended to authorize the County Administrator, when it is in the best interest of the individual County departments or agencies and with the recommendation of the CFO, to transfer appropriations between departments (from one department to another). The County Administrator is permitted to transfer appropriations within the County’s General Fund, Capital Projects Fund, and Capital Improvements Fund, excluding all Enterprise Funds, as long as it: a) Does not exceed $200,000 in a single transfer b) Does not increase the total overall budget of the fund c) Does not establish a new capital project d) Does not eliminate or materially change the scope, purpose, or intended outcome of a project Done this ___ day of ________ 2026. COUNTY COUNCIL OF BEAUFORT COUNTY By: ___________________________________ Alice Howard, Chairman ATTEST: ________________________ Sarah Brock, Clerk to Council Page 113 of 332 Options: 1. Restore original language: The County Administrator or the CFO is permitted, when it is in the best interest of the individual County departments or agencies, to transfer appropriations between departments (from one department to another department) and between the County’s General Fund, Capital Projects Fund and Capital Improvements Fund (from one Fund to another Fund) up to $150,000. 2. Transfers between departments approved upon authorization from the Administrator/CFO. Transfers within CIP funds conditionally authorized: The County Administrator or the CFO is permitted, when it is in the best interest of the individual County departments or agencies, to transfer appropriations between departments (from one department to another). The County Administrator or the CFO is permitted to transfer appropriations within the County’s General Fund, Capital Projects Fund, and Capital Improvements Fund as long as it: a) Does not exceed $200,000 in a single transfer. b) Does not increase the total overall budget of the fund. c) Does not establish a new capital project. d) Does not eliminate or materially change the scope, purpose, or intended outcome of a project. 3. Provide full authority for Administrator/CFO to authorize transfers without a threshold limit: The County Administrator or the CFO is permitted, when it is in the best interest of the individual County departments or agencies, to transfer appropriations between departments (from one department to another department) and between and within the County’s General Fund, Capital Projects Fund and Capital Improvements Fund. Page 114 of 332 Summary of Findings: Administrator/CFO has full authorization on transfers with no $ limit Administrator/CFO has authorization on transfers within a defined threshold Nothing specifically noted in a budget ordinance Dorchester County Jasper County Richland County Charleston County Horry County Lexington County Greenville County Colleton County Aiken County Dorchester County • SECTION VII: Each department head is permitted, subject to the County Administrator's (or his designee's) approval, to transfer appropriation(s) between object classification codes within that department. Transfers between objects 11-01 through 26-01 (personnel codes) must be approved by the County Administrator or their designee; transfers from objects 11-01 and 26- 01 to other object codes are not permitted under any circumstances without the approval of County Council. Transfers from objects 33-03 (autopsies & postmortems), 53-02 (cell phones) and 62-02 (fuel) are not permitted without the approval of the County Administrator. The County Administrator or CFO is permitted, when it is in the best interest of the individual County departments or agencies, to transfer appropriations between departments (from one department to another department) and between the County's General Fund, Capital Projects Fund, Special Revenue Funds, and Capital Improvements Fund (from one Fund to another Fund). Charleston County • Overall: Administrator has almost executive authority in transfers • SECTION 9: Organization units are bound to the appropriated disbursements as defined in SECTION 2 and delineated in the Fiscal Year 2027 Approved Budget Detail document. o (a) For contributions, the organizational budgets are bound by “object code.” o (b) The County Administrator, or his designated representative, is hereby authorized to effect transfers between organizational units. The County Administrator is also authorized to further restrict budget transfers within major expenditure categories. o (c) County Council may by resolution effect transfers from Council's Contingency to organizational units. Page 115 of 332 o (d) County Council may by amendment to this Ordinance adjust appropriation transactions affecting fund totals, other than those authorized elsewhere within this Ordinance. o (e) For personnel costs, the organizational budgets are bound at the total of personnel costs. Funds cannot be transferred into or out of personnel. Greenville County • Administrator has executive authority • SECTION 4: LINE ITEM ACCOUNTS ESTABLISHED. All line item accounts as set forth in the FY2027 Budget Proposal, as adjusted and established by the aforementioned appropriation, are herein established and incorporated as if fully set forth and shall be expended, transferred, or supplemented pursuant to the Greenville County Code. The County Administrator is authorized to transfer funds between departments to make necessary changes and adjustments to reflect Council amendments to the proposed budget. Richland County • Nothing specifically noted in budget ordinance Jasper County • Same language as our FY26 ordinance but transfer limit is smaller: Colleton County • As long as the overall budget is not increased, Administrator has full authority • SECTION 9. TRANSFERS VALIDATED All duly authorized transfers of funds heretofore made from one account to another, or from one fund to another during Fiscal Year 2025-2026, are hereby approved, and the Administrator shall be authorized to implement and fulfill the same transfer authority in Fiscal Year 2026-2027 so long as the Page 116 of 332 transfer does not exceed the amount budgeted therefore or violate any restrictions associated with the expenditure of monies from such fund. Horry County • Allowed up to $100,000 which then needs a resolution • SECTION 36. Any budget transfer from the Capital Improvement Plan (CIP) Inflation or General Contingency that exceeds $100,000 must first be approved by County Council through a resolution before the transfer is completed. These resolutions are not required to first go through a Council Committee. Lexington County • Nothing specifically noted in budget ordinance Aiken County • Generally allowed with approval from Administrator • Generally, transfers between object categories are authorized unless restricted herein, or elsewhere by ordinance or administrative directive. Budget transfers involving the Personnel Services object categories of a department's budget must be requested in writing by the supervising department head, and approved in writing by the County Administrator or his designee. Transfers out of Personnel Services object categories are prohibited except for pooled payments for health insurance, taxes, worker compensation, and similar purposes, or personnel position reassignments for efficiency or emergencies as authorized by the County Administrator. Transfers out of the Road Maintenance Fund are prohibited, except as approved herein for interest and indirect cost payments. Departments are authorized to transfer funds within operating accounts with the approval of the County Administrator or his designee. Page 117 of 332 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: 2026/44: AN ORDINANCE AMENDING THE FY2027 BUDGET FOR STORMWATER UTILITY OPERATIONS, CARRYOVER PURCHASE ORDERS, ACCOMMODATIONS & HOSPITALITY TAX PROJECTS, AND FACILITY OPERATIONS. THE VOTE AT FINANCE, ADMINISTRATION, AND ECONOMIC DEVELOPMENT COMMITTEE MEETING ON AUGUST 17, 2026 - 9:0 THE VOTE AT FIRST READING ON SEPTEMBER 14, 2026 - 10:0 THE VOTE AT SECOND READING AND PUBLIC HEARING ON SEPTEMBER 28, 2026 - 10:0 MEETING NAME AND DATE: County Council October 12, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval of the budget amendment ordinance to properly recognize the applicable fund balances and appropriate the funds necessary for the Stormwater Utility operational budget, the identified carryover Purchase Orders, & Facilities Operations. PRESENTER INFORMATION: Sandy Novak, Finance Director, 5 minutes ITEM BACKGROUND: The amendment allocates stormwater funds to finance the Royal Pines Drainage Project and address four ongoing projects for which purchase orders were not correctly entered in the budget process, totaling $7,247,672.28. The details of the transfers are as follows: (1) $3,475,000 from the Stormwater Utility Enterprise Fund for the Stormwater Utility operational budget; and (2) $1,916,589.12 from A-Tax to fund 2 carryover Purchase Orders that were planned in the prior fiscal year but not adequately budgeted in FY2027($642,489.12), support for the Waterfront Park project ($1,000,000), and 15% of A-Tax for to support affordable housing ($274,100) (3) $1,000,000 from H-Tax to support the Waterfront Park project (4) $539,900 from Parks & Rec Impact Fees to fund a carryover Purchase Orders that was planned in the prior fiscal year but not adequately budgeted in FY2027 (5) $62,914.06 in Airport Funds to fund a carryover Purchase Orders that was planned in the prior fiscal year but not adequately budgeted in FY2027 and (6) $253,269.10 from the General Fund fund balance for the HVAC replacement at the Animal Shelter. FISCAL IMPACT: The amendment increases FY2027 appropriations by $7,247,672.28. The amendment does not rely on a new tax or fee; the appropriations are funded from existing fund balances in the Stormwater Utility Fund, Local Accommodations Tax Fund, Parks and Recreation Impact Fee Fund, Hilton Head Island Airport Enterprise Fund and the General Fund fund balance. Funding breakdown: $3,475,000.00 Stormwater Utility Fund balance; $1,916,589.12 Local A-Tax fund balance; $1,000,000 H-Tax fund balance; $539,900.00 Parks and Recreation Page 118 of 332 Impact Fee fund balance; $62,914.06 Hilton Head Island Airport fund balance; and $253,269.10 from General Fund fund balance. APPROVAL HISTORY: The vote at Finance, Administration, and Economic Development Committee Meeting on August 17, 2026 - 9:0 The vote at First Reading on September 14, 2026 - 10:0 The vote at Second Reading and Public Hearing on September 28, 2026 - 10:0 Page 119 of 332 ORDINANCE 2026/____ AN ORDINANCE TO AMEND BEAUFORT COUNTY’S BUDGET ORDINANCE FOR FISCAL YEAR 2027 (ORDINANCE NO. 2026/29) TO AMEND SECTION III, COUNTY OPERATIONS REVENUES, AND SECTION IV, COUNTY OPERATIONS APPROPRIATION TO APPROPRIATE FUND BALANCE FOR STORMWATER UTILITY OPERATIONS, CERTAIN GENERAL FUND CARRYOVER PURCHASE ORDERS, AND FACILITY OPERATIONS WHEREAS, the Beaufort County Council, pursuant to the authority granted by the Constitution of the State of South Carolina and the General Assembly of the State of South Carolina, has the authority to prepare an annual budget for all Beaufort County Departments, Agencies, Elected Officials, Boards and Commissions; and WHEREAS, Beaufort County Council adopted Ordinance 2026/29 on June 22, 2025, which set the County’s FY2027 budget and associated expenditures; and WHEREAS, the County has identified a need to appropriate $3,475,000 from the Stormwater Utility Fund balance, an Enterprise Fund, to the Stormwater Utility operational budget for FY2027; and WHEREAS, the County has further identified four carryover Purchase Orders for projects that were planned but were not appropriately budgeted in FY2027 and therefore require an appropriation from Local 3% Accommodations Tax Special Revenue Fund fund balance, Parks and Recreation Impact Fees fund balance, and HHI Airport Enterprise Fund fund balance; and WHEREAS, the required overall appropriations for these carryover Purchase Orders totals $1,245,303.18 and consists of the projects and amounts identified in Exhibit A attached hereto and incorporated herein by reference; and WHEREAS, the County has a need to appropriate $253,269.10 from the General Fund fund balance to repair a failing HVAC at the Animal Shelter from funds recently received via a recent settlement involving the impaired equipment; and WHEREAS, the City of Beaufort has requested Local 3% Accommodations and Hospitality Tax for a project on at the Waterfront Park and the County desires to provide $1,000,000 of A-Tax funding and $1,000,000 of H-Tax funding for the project; and WHEREAS, The County desires to use 15% of Local 3% Accommodations Tax for Affordable Workforce Housing in the amount of $274,100; and WHEREAS, the combined impact of this budget amendment is to increase FY2027 appropriations by $7,247,672.28, consisting of $3,475,000 from Stormwater Utility Fund balance $1,916,589.12 from Local 3% Accommodations Tax fund balance, $1,000,000 from H-Tax fund balance, $539,900 from Parks and Recreation Impact Fund, $62,914.06 from Airports, and $253,269.10 from General Fund fund balance; and WHEREAS, in the interest of good accounting practices and transparency in the budget process, it is beneficial and necessary to amend the budget to reflect the changes as set forth herein. Page 120 of 332 NOW, THEREFORE, BE IT ORDAINED BY BEAUFORT COUNTY COUNCIL that the FY2027 Beaufort County Budget Ordinance 2026/29 is hereby amended as follows: SECTION III. COUNTY OPERATIONS REVENUES A. Stormwater Utility Fund. The Stormwater Utility Fund, an Enterprise Fund, is amended to recognize and appropriate $3,475,000 from Stormwater Utility Fund balance for the Stormwater Utility operational budget. B. Local 3% Accommodation Tax. Local 3% Accommodations Tax revenues are amended to recognize and appropriate $642,489.12 from fund balance to support carryover Purchase Orders identified in “Exhibit A”, $1,000,000 from fund balance to support the Waterfront Park project, and $274,100 from fund balance to support workforce housing for a total of $1,916,589.12. C. Local Hospitality Tax. H-Tax fund budget is amended to recognize and appropriate $1,000,000 for the Waterfront Park project from fund balance. D. Parks and Recreation Impact fees. Impact fees revenues are amended to recognize and appropriate $539,900 from fund balance to support carryover Purchase Orders identified in “Exhibit A”. E. Airports Fund. Airport revenues are amended to recognize and appropriate $62,914.06 from Airports fund balance to support carryover Purchase Orders identified in “Exhibit A”. F. General Fund Fund Balance. General fund fund balance is amended to reorganize and appropriate $253,269.10 to support the HVAC replacement at the Animal Shelter facility. The details of line-item accounts for these funds are hereby adopted as part of this Ordinance. SECTION IV. COUNTY OPERATIONS APPROPRIATION A. Stormwater Utility Fund (Fund 5025). The Stormwater Utility operational appropriation is increased by $3,475,000, funded from Stormwater Utility Fund balance. B. Local 3% Accommodation Tax Fund (Fund 2001) is increased by $1,916,589.12 from fund balance. C. Local Hospitality Tax (Fund 2002) is increased by $1,000,000 from fund balance. D. Parks and Recreation Impact fees (Fund 2650) are increased by $539,900 from fund balance. E. Airports (Fund 5102) is increased by $62,914.06 from fund balance. F. Facilities Operations (Fund 1000) is increased by $253,269.10 from General Fund fund balance. Page 121 of 332 EXHIBIT A FY2026 CARRYOVER PURCHASE ORDERS Project Funding Source Purchase Order # Amount Alljoy Boat Landing Local 3% A-Tax 270328 $397,989.12 Broad River Fishing Pier Local 3% A-Tax 270333 $244,500.00 BRACE Project Lighting P&R Impact Fees 270308 $539,900.00 SCAC Grant HHI Airport $62,914.06 Total Appropriations $1,245,303.18 Done this ___ day of __________ 2026. COUNTY COUNCIL OF BEAUFORT COUNTY By: ___________________________________ Alice Howard, Chairman ATTEST: ________________________ Sarah Brock, Clerk to Council First Reading: Public Reading: Second Reading: Third Reading: Page 122 of 332 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: 2026/45: AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE NECESSARY DOCUMENTS AND PROVIDE FUNDING FOR THE PURCHASE OF REAL PROPERTY IDENTIFIED AS TMS NOS. R200- 010-000-0340-0000, R200-010-000-021G-0000, AND R200-010-000-0446-0000 FROM BRICKYARD COMMONS, LLC FOR THE ROYAL PINES STORMWATER PROJECT IN THE AMOUNT OF $3,475,000. THE VOTE AT THE FINANCE, ADMINISTRATION, AND ECONOMIC DEVELOPMENT COMMITTEE MEETING ON AUGUST 17, 2026 - 9:0 THE VOTE AT FIRST READING ON SEPTEMBER 14, 2026 - 10:0 THE VOTE AT SECOND READING AND PUBLIC HEARING ON SEPTEMBER 28, 2026 - 10:0 MEETING NAME AND DATE: County Council October 12, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends that an ordinance authorizing the County Administrator to execute the necessary documents and provide funding for the purchase of the three identified parcels and the associated fixed-price project agreement with Brickyard Commons, LLC, subject to final legal, procurement, risk, title, environmental, and funding review. PRESENTER INFORMATION: Jared Fralix, Assistant County Administrator ITEM BACKGROUND: Beaufort County has identified the southern Royal Pines area as an area of known drainage concern, and the area was evaluated as part of the Northern Lady's Island Drainage Study completed in May 2024. Last fall, a developer, Brickyard Commons, LLC, approached the County with an unsolicited public-private stormwater concept for this area. An earlier Royal Pines Stormwater Project concept involved a larger and more complex project footprint. After further discussions and County review, the developer submitted a revised fixed-price proposal limited to three parcels currently owned by Brickyard Commons, LLC, totaling approximately 25 acres east of Middle Road. The revised proposal is intended to provide a smaller, more achievable stormwater opportunity while preventing the site from advancing as a potential 75-unit residential development. FISCAL IMPACT: The proposed fixed contract price is $3,475,000, inclusive of the land, design, and permitting work, and the defined construction scope. Funding is anticipated from the Stormwater Utility Fund 5025-90-9020-54500 APPROVAL HISTORY: The vote at the Finance, Administration, and Economic Development Committee meeting on 8/17/2026 - 9:0 Page 123 of 332 The vote at First Reading on September 14, 2026 - 10:0 The vote at Second Reading and Public Hearing on September 28, 2026 - 10:0 Page 124 of 332 ORDINANCE 2026/_____ AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE NECESSARY DOCUMENTS AND PROVIDE FUNDING FOR THE PURCHASE OF REAL PROPERTY CONSISTING OF APPROXIMATELY TWENTY-FIVE (25) ACRES IN THE ROYAL PINES AREA OF LADY'S ISLAND, IDENTIFIED AS TMS NOS. R200-010-000-0340- 0000, R200-010-000-021G-0000, AND R200-010-000-0446-0000, FOR THE ROYAL PINES MARSH COURSE STORMWATER PROJECT - PHASE 1 WHEREAS, Beaufort County Council and Beaufort County ("County") is a body politic and political subdivision of the State of South Carolina; and WHEREAS, under SC Code Ann. Sections 4-9-25 and 4-9-30, the County is empowered to act in the interests of public safety and in matters involving the health and welfare of its citizens, and may acquire real property; and WHEREAS, the County has identified drainage and flooding concerns affecting the southern Royal Pines area of Lady's Island, and the area is included within the 2024 Lady's Island Drainage Study, which identifies multiple problematic drainage zones surrounding the proposed project site; and WHEREAS, Brickyard Commons, LLC ("Seller" or "Developer") owns three (3) parcels of real property identified as TMS Nos. R200-010-000-0340-0000, R200-010-000-021G-0000, and R200-010- 000-0446-0000, consisting of approximately twenty-five (25) acres, hereinafter referred to collectively as the "Property" or "Project Site"; and WHEREAS, the County desires to acquire the Property for the Royal Pines Stormwater Project - a best management practice regional stormwater retention facility intended to provide public stormwater benefit to the surrounding community; and WHEREAS, acquisition of the Property will dedicate the Project Site to public stormwater retention purposes and will prevent the Property from being advanced as a potential seventy-five (75) unit residential duplex development that could further affect drainage conditions in the surrounding area; and WHEREAS, the County and Developer have negotiated a proposed Fixed-Price Project Agreement under which Developer would convey the Property to the County and perform the defined design, permitting, and construction obligations for Phase 1 of the Royal Pines Stormwater Project; and WHEREAS, the proposed fixed contract price is Three Million Four Hundred Seventy-Five Thousand Dollars ($3,475,000.00), which is inclusive of conveyance of the Property, design and permitting work, and the defined construction scope, subject to the final terms and conditions of the Fixed-Price Project Agreement; and WHEREAS, under the proposed agreement, Developer would convey fee simple title to the Property to the County upon execution of the agreement and payment of the first installment, subject to temporary retained mineral and excavation rights during construction that must be relinquished to the County upon completion as provided in the agreement; and WHEREAS, the funding for the purchase of the Property and related project obligations will be from the Stormwater Utility (Fund 5025) – Infrastructure, line item 5025-90-9020-54500; and Page 125 of 332 WHEREAS, Beaufort County Council finds that it is in the best interest of the citizens and residents of Beaufort County to purchase the Property for the reasons stated above. NOW, THEREFORE, BE IT ORDAINED by Beaufort County Council, duly assembled, that the County Administrator is authorized to execute the necessary documents to purchase and fund the purchase of the real property identified as TMS Nos. R200-010-000-0340-0000, R200-010-000-021G- 0000, and R200-010-000-0446-0000, and to execute the related Fixed-Price Project Agreement and associated closing, conveyance, funding, and project documents for the Royal Pines Stormwater Project, subject to review and approval as to form by the County Attorney and subject to available and lawfully appropriated funds. Done this ___ day of __________ 2026. COUNTY COUNCIL OF BEAUFORT COUNTY By: ___________________________________ Alice Howard, Chairman ATTEST: ________________________ Sarah Brock, Clerk to Council First Reading: Public Reading: Second Reading: Third Reading: Page 126 of 332 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: 2026/46: AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR OR NEGOTIATING AUTHORITY IN ACCORDANCE WITH RESOLUTIONS 2019/44 AND 2021/20 TO EXECUTE ANY AND ALL NECESSARY DOCUMENTS FOR THE ACCEPTANCE OF RIGHT OF WAY AND/OR TEMPORARY CONSTRUCTION EASEMENT PROPERTIES AS SHOWN ON EXHIBIT A PAGES 1-4 ASSOCIATED WITH THE SIDEWALKS AND MULTI-USE PATHWAYS – SAFE ROUTES TO SCHOOLS AND EXHIBIT A PAGES 5-8 ASSOCIATED WITH THE LADY’S ISLAND CORRIDOR TRAFFIC IMPROVEMENTS. THE VOTE AT THE PUBLIC FACILITIES COMMITTEE MEETING ON AUGUST 17, 2026 - 9:0 THE VOTE AT FIRST READING ON SEPTEMBER 14, 2026 - 10:0 THE VOTE AT SECOND READING AND PUBLIC HEARING ON SEPTEMBER 28, 2026 - 10:0 MEETING NAME AND DATE: County Council October 12, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Approval to formalize Right of Way interests for the parcels shown on EXHIBIT A Pages 1-4 associated with the Sidewalks and Multi-use Pathways – Safe Routes to Schools and EXHIBIT A Pages 5-8 associated with the Lady’s Island Corridor Traffic Improvements PRESENTER INFORMATION: Bryan Bauer PE, ENV SP, Director of Engineering (5 Minutes) ITEM BACKGROUND: Per Resolution 2019/44 for the 2018 One Percent (1%) Transportation Sales and Use Tax which states “County Council authorizes the acquisition of all rights-of-way needed by way of negotiations by agents or administrators of Beaufort County and/or by way of eminent domain of such rights-of-way to complete the projects” which includes the Sidewalks and Multi-use Pathways – Safe Routes to School and Lady’s Island Corridor Traffic Improvements, and “all acquisitions of such rights-of-way will conform to the standards approved by Beaufort County, South Carolina Department of Transportation, and the Federal Highway Administration”. EXHIBIT A Pages 1-4 document the Tracts requiring new right of way and/or temporary construction easement for the Sidewalks and Multi-use Pathways – Safe Routes to Schools and EXHIBIT A Pages 5-8 for the Lady’s Island Corridor Traffic Improvements. Beaufort County and its agent are acquiring the rights-of-way and/or temporary construction easements for the project by appraisal recommending the ‘just compensation’ value as approved by Beaufort County and SCDOT in accordance with the Intergovernmental Agreement. The Beaufort County approval/negotiating process is following Resolution 2021/20 for the ‘just compensation’ value to the property owner and/or eminent domain proceedings. FISCAL IMPACT: Funded by the 2018 One Percent Transportation Sales and Use Tax Account # 4705-80-0000-54500-PTHWY Page 127 of 332 Current balance is $13,148,493.49 APPROVAL HISTORY: The vote at the Public Facilities Committee Meeting on August 17, 2026 - 9:0 The vote at First Reading on September 14, 2026 - 10:0 The vote at Second Reading and Public Hearing on September 28, 2026 - 10:0 Page 128 of 332 Page I of2 ORDINANCE NO. 2026/ AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR OR NEGOTIATING AUTHORITY TO EXECUTE ANY AND ALL NECESSARY DOCUMENTS FOR THE ACCEPTANCE OF RIGHT OF WAY AND/OR TEMPORARY CONSTRUCTION EASEMENT PROPERTIES AS SHOWN ON EXHIBIT A PAGES 1–4 ASSOCIATED WITH THE SIDEWALKS AND MULTI-USE PATHWAYS – SAFE ROUTES TO SCHOOLS AND EXHIBIT A PAGES 5–8 ASSOCIATED WITH THE LADY'S ISLAND CORRIDOR TRAFFIC IMPROVEMENTS WHEREAS, Beaufort County Council approved Resolution 2019/44 for the 2018 One Percent (1%) Transportation Sales and Use Tax that authorizes the acquisition of all right-of-ways needed by way of negotiations conducted by agents or administrators of Beaufort County and/ or by way of eminent domain of such right-of-ways needed to complete the projects which includes: 1. Sidewalks and Multi-use Pathways – Safe Routes to School a. Broad River Boulevard and Riley Road b. Broad River Drive c. Salem Road 2. Lady’s Island Corridor Traffic Improvements a. Airport Frontage Road Phase 2 b. Hazel Farm Road/Gay Drive c. US 21 Widening near Walmart WHEREAS, Beaufort County Council approved Resolution 2021/20, a Resolution establishing right of way ac quisition policies associated with the implementation of 2018 One Cent Sales Tax Referendum Projects approved by voters November 6, 2018; and WHEREAS, Beaufort County and its agents are acquiring the right of ways and/or temporary construction easem ents to the standards approved by Beaufort County, South Carolina Department of Transportation, and the Federal Highway Administration.; and WHEREAS, Beaufort County and its agents are acquiring the right of ways and/or temporary construction easem ents for the properties as shown on Exhibit A Pages 1-4 for the Sidewalks and Multi-use Pathways – Safe Routes to School projects and Exhibit A Pages 5-8 for the Lady’s Island Corridor Traffic Improvements projects by appraisal recommending the ‘just compensation’ value as approved by Beaufort County and SCDOT in accordance with the Intergovernmental Agreement; and Page 129 of 332 Page I of2 WHEREAS, Beaufort County approval/negotiating process is following Resolution 2021/20 for the ‘just compensa tion’ value to the property owner and/or eminent domain proceedings; and WHEREAS, the right of way and/or te mporary construction easement properties for the Sidewalks and Multi-use Pathways – Safe Routes to School projects and Lady’s Island Corridor Traffic Improvements projects are funded by the 2018 One Percent Transportation Sales and Use Tax; and WHEREAS, Beaufort County Council believe s that it is in the best interest of its citizens to formalize the County’s Right of Way interest in the properties on Exhibit A Pages 1-4 for th e Sidewalks and Multi-use Pathways – Safe Routes to School projects and E xhibit A Pages 5-8 for the Lady’s Island Corridor Traffic Improvements projects in Beaufort County. NOW, THEREFORE, BE IT ORDAINED that Beaufort County Council hereby authorizes the County Ad ministrator to execute any and all necessary documents for the acceptance of Right of Way properties on Exhibit A Pages 1-4 for the Sidewalks and Multi-use Pathways – Safe Routes to School projects and Exhibit A Pages 5-8 fo r the Lady’s Island Corridor Traffic Improvements projects in Beaufort County. ADOPTED this _____ day of _______, 2026. COUNTY COUNCIL OF BEAUFORT COUNTY By: ______________________________________ Alice Howard, Chairwoman ATTEST: ___________________________ Sarah W. Brock, Clerk to Council Third and Final Reading: Public Hearing: Second Reading: First Reading: Page 130 of 332 &9)*#*5" 1"(& Page 131 of 332                   "3 $"()&-)$"3 ()3  3 &$3 &/&3 & /3 ( 3 "$)3 *$3 (!3                                                       120 "()&-)$"3 ()3  3 &$3 &/&3 &/3 ( 3   .%'+3 %.#,3                                 &9)*#*5" 1"(& Page 132 of 332 &9)*#*5" 1"(& Page 133 of 332 &9)*#*5" 1"(& Page 134 of 332 &9)*#*5" 1"(& Page 135 of 332 &9)*#*5" 1"(& Page 136 of 332 &9)*#*5" 1"(& Page 137 of 332 &9)*#*5" 1"(& Page 138 of 332 Page 139 of 332 Page 140 of 332 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: 2026/47: AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE AN ELECTRIC LINE EASEMENT WITH DOMINION ENERGY ON THE PROPERTY KNOWN AS POCOTALIGO PRESERVE (TMS R710 012 000 0001 0000 AND R710 012 000 0072 0000). THE VOTE AT NATURAL RESOURCES COMMITTEE ON SEPTEMBER 8, 2026 - 7:0 THE VOTE AT FIRST READING ON SEPTEMBER 28, 2026 - 10:0 MEETING NAME AND DATE: County Council October 12, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval. If the Natural Resources Committee recommends approval, then move forward with three ordinance readings and a public hearing at County Council. PRESENTER INFORMATION: Dylan Kidd, Interim Assistant County Administrator, 5 minutes ITEM BACKGROUND: Beaufort County owns in fee-simple the property known as Pocotaligo Preserve located at 30 Cotton Hall Road in Yemassee, SC. Dominion Energy owns an overhead electric line that runs through various open fields on the property, which is negatively impacted by County-initiated land management activities. Due to the length of time the original easement agreement was executed by prior property owners, and the desire by both the County and Dominion to relocate the electric line to a more suitable location along the property access road, the execution of a new easement agreement is recommended. FISCAL IMPACT: There is no fiscal impact. Dominion will fully fund the relocation of the electrical line. APPROVAL HISTORY: The vote at Natural Resources Committee on September 8, 2026 - 7:0 The vote at First Reading on September 28, 2026 - 10:0 Page 141 of 332 ORDINANCE 2026/____ AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE AN ELECTRIC LINE EASEMENT WITH DOMINION ENERGY ON THE PROPERTY KNOWN AS POCOTALIGO PRESERVE (TMS R710 012 000 0001 0000 and R710 012 000 0072 0000) WHEREAS, Beaufort County (“County”) owns in fee-simple the property known as Pocotaligo Preserve (“Property”) with TMS numbers R710 012 000 0001 0000 and R710 012 000 0072 0000; and WHEREAS, Dominion Energy (“Dominion”) owns an overhead electric line currently traversing through multiple open fields on the Property; and WHEREAS, the County and Dominion desire to formalize the use of the Property with an electric line easement and relocate the electric line from its current location to a more suitable location along the Property access road. NOW, THEREFORE be it ordained that Beaufort County Council duly assembled, does hereby authorize the County Administrator to execute an electric line easement with Dominion Energy on the property known as Pocotaligo Preserve (TMS R710 012 000 0001 0000 and R710 012 000 0072 0000). ORDAINED this ____ day of ____________, 2026 COUNTY COUNCIL OF BEAUFORT COUNTY BY: ___________________________________ Alice Howard, Chairman ATTEST: ___________________________ Sarah W. Brock, JD, Clerk to Council Page 142 of 332 RW-4-E-SC (Rev. 4-2019) Easement # 908057 INDENTURE, made this _________ day of ____________________, 2026 by and between Beaufort County of the State of South Carolina, hereinafter called “Grantor” (whether singular or plural), and the DOMINION ENERGY SOUTH CAROLINA, INC., a South Carolina corporation, having its principal office in Cayce, South Carolina, hereinafter called “Grantee”. WITNESSETH: That, in consideration of the sum of One Dollar ($1.00) received from Grantee, Grantor, being the owner of land situate in th e County of Beaufort, State of South Carolina, hereby grants and conveys to Grantee, its successors and assigns, the right to construct, extend, replace, relocate, perpetually maintain and operate an overhead or underground electric line or lines consisting of a ny or all of the following: poles, conductors, lightning protective wires, municipal, public or private communication lines, cables, condu its, pad mounted transformers, guys, push braces and other accessory apparatus and equipment deemed by Grantee to be necessary or desirable, upon, over, across, through and under land described as follows: a tract or lot of land containing 527.1700 acres, more or less, and being the same lands conveyed to Grantor by deed of Open Space Institute Land Trust, Inc., dated or recorded 10/20/2023, and filed in the Register of Deeds office for Beaufort County in Deed book 4284 at Page 1424. All those certain pieces, parcels, or tracts of land, situate, lying and being in Beaufort County, South Carolina, containing 232.18 Acres known and designated as "Duveaux Hill Parcel A" and 294.99 Acres known and designated as "Parcel C" and being more fully described and shown as plat entitled "This Plat is Prepared at the Request of the Tomotley Crew, LLC A Division of Tax Map #R710 012 000 001 0000, Sheldon Area, Beaufo rt County, South Carolina" on that certain plat recorded in Plat Book 161 at Page 136. The easement is for the electric facilities more fully shown on Dominion Energy drawing # 86320 and any revisions made thereof and is made a part hereof by reference only. This easement supersedes and replaces the previous easement granted by The Tomotley Crew, LLC recorded October 4, 2022, and recorded in the Beaufort County Register of Deeds in Deed Book 4187 page 263. A signed Dominion Energy drawing by the Grantor will be authorization for the Grantee to install future facilities within the limits of the property shown on the above-mentioned plat. TMS: R710 012 000 0001 0000 and R710 012 000 0072 0000 Together with the right from time to time to install on said line such additional lines, apparatus and equipment as Grantee m ay deem necessary or desirable and the right to remove said line or any part thereof. Together also with the right (but not the obligation) from time to time to trim, cut or remove trees, underbrush and other ob structions that are within, over, under or through a strip of land (“Easement Space”) extending Fifteen (15) feet on each side of any pole lines and Five (5) feet on each side of any underground wires and within, over, under or through a section of land extending Twelve (12) feet from the door side(s) of any pad mounted transformers, elbow cabinets, switchgears or other devices as th ey are installed; provided, however, any damage to the property of Grantor (other than that caused by trimming, cutting or removing) caused by Grantee in maintaining or repairing said lines, shall be borne by Grantee; provided further, however, that Granto rs agree for themselves, their successors and assigns, not to build or allow any structure to be placed on the premises in such a manner t hat any part thereof will exist within the applicable above specified Easement Space, and in case such structure is bu ilt, then Grantor, or such successors and assigns as may be in possession and control of the premises at the time, will promptly remove the same upon de mand of Grantee herein. Grantor further agrees to maintain minimum ground coverage of thirty six (36) inches and maximum ground coverage of fifty four (54) inches over all underground primary electric lines. Together also with the right of entry upon said lands of Grantor for all of the purposes aforesaid. The words “Grantor” and “Grantee” shall include their heirs, executors, administrators, successors and assigns, as the case m ay be. IN WITNESS WHEREOF, Grantor has caused this indenture to be duly executed the day and year first above written. WITNESS: [SIGNATURES TO FOLLOW Page 143 of 332 RW-4-E-SC (Rev. 4-2019) Easement # 908057 Beaufort County ______________________________________________________________ By: ________________________________________________________ 1st Witness ______________________________________________________________ ____________________________________________________________ 2nd Witness Print Name ___________________________________________________________ Title ACKNOWLEDGMENT STATE OF SOUTH CAROLINA ) ) COUNTY OF Beaufort ) The foregoing instrument was acknowledged before me, the undersigned Notary, and I do hereby certify that the within named o f Beaufort County personally appeared before me this day and that the above named acknowledged the due execution of the foregoing instrument. Sworn to before me this ______ day of ____________, 2026 _________________________________ Signature of Notary Public State of SC My commission expires: ___________ ________________________________ Print Name of Notary Public RIGHT OF WAY GRANT TO DOMINION ENERGY SOUTH CAROLINA, INC. Line: COTTON HALL TIE LINE County: Beaufort R/W File Number: 29059 Grantor(s): Beaufort County Return to: DESC C/O Right of Way Dept., 81 May River Road, Bluffton, SC 29910 Page 144 of 332 RW-4-E-SC (Rev. 4-2019) Page 145 of 332 TRASK PKWY.(US HWY 21) COTTON HALL RD. STONEY CREEK CEMETARY RD. TRASK PKWY.(US HWY 21) NO DATEBYREVISIONFORDRNSHEET OF SHEETS TITLEDETAILSCALE:SUB.APPDIST#CKT# DOMINION ENERGY SOUTH CAROLINA, INC. SCALE: DEVELOPER'S SIGNATURE BLOCK 3 DAYS BEFORE DIGGINGIN SOUTH CAROLINACALL 811IT'S THE LAWPALMETTO UTILITY PROTECTION SERVICE EASEMENT NO.FILE NUMBERR/W AGENTRIGHT OF WAY INFORMATION W.R.#STARTED COMPLETEDCLOSED OUTW.O.# GAS ENG.-TECH.ELECTRIC ENG.-TECH.COORDINATORBY:BY:BY: DOMINION ENERGY SOUTH CAROLINA, INC.ELECTRIC DISTRIBUTION SYMBOLS PRELIMINARY Page 146 of 332 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: 2026/48: AN ORDINANCE AMENDING THE BEAUFORT COUNTY CODE OF ORDINANCES, CHAPTER74 - BUILDING AND BUILDING REGULATIONS, SECTION 74-64, ADOPTION OF BUILDING CODES (AMENDS CODE OF ORDINANCES TO ADOPT THE 2024 STATE MANDATED CODE EDITIONS). THE VOTE AT NATURAL RESOURCES COMMITTEE ON SEPTEMBER 8, 2026 - 7:0 THE VOTE AT FIRST READING ON SEPTEMBER 28, 2026 - 10:0 MEETING NAME AND DATE: County Council October 12, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval. Motion to approve/deny — AN ORDINANCE AMENDING THE BEAUFORT COUNTY CODE OF ORDINANCES, CHAPTER 74 - BUILDING AND BUILDING REGULATIONS, SECTION 74-64, ADOPTION OF BUILDING CODES (AMENDS CODE OF ORDINANCES TO ADOPT THE 2024 STATE MANDATED CODE EDITIONS) Move forward to Council for First Reading PRESENTER INFORMATION: Michael Brantley, Director Building Services, 5 minutes ITEM BACKGROUND: On August 26, 2025, the South Carolina Building Codes Council (the "Council") adopted the latest editions of the mandatory code and appendices with modifications, as referenced in S.C. Code Ann. §6-9-50 (1976, as amended), to be enforced by all municipalities and counties in South Carolina. The Council established the implementation date for local jurisdictions as January 1, 2027. Local adoption of the latest state mandated code editions is required by state law. FISCAL IMPACT: No Fiscal Impact APPROVAL HISTORY: The vote at Natural Resources Committee on September 8, 2026 - 7:0 The vote at First Reading on September 28, 2026 - 10:0 Page 147 of 332 '-" South Carolina N Building Codes 0 Modifications N Index Page 148 of 332 Introduction to 2024 Building Codes Modifications Index On August 26, 2025, the South Carolina Building Codes Council (the “Council”) adopted the latest editions of the mandatory codes and select appendices with modifications, as referenced in S.C. Code Ann. §6 -9-50 (1976, as amended), to be enforced by all municipalities and counties in South Carolina. More specifically, t he Council modified and adopted the building codes listed below for use in the State of South Carolina: 2024 Edition of the International Building Code1 2024 Edition of the International Residential Code2 2024 Edition of the International Fire Code3 2024 Edition of the International Plumbing Code4 2024 Edition of the International Mechanical Code5 2024 Edition of the International Fuel Gas Code6 2023 Edition of the National Electrical Code The Council established the implementation date for local jurisdictions as January 1, 2027. The Modifications Index lists all modifications that apply to the mandatory building codes listed above, as well as any appendices adopted by the Council . The modifications are arranged by the affected code section numbers in ascending order. Modifications continued from a prior building code cycle were renumbered to coincide with the 2024 building code cycle numbering, and are distinguished by a note and reference to their prior modification numbers. Strikethrough indicates the language deleted by a modification and an underline indicates language added. The latest edition of the permissive codes referenced in S.C. Code Ann. § 6-9-60 (1976, as amended) may be adopted by municipalities and counties via ordinance, and this local adoption by ordinance must take place before enforcement can begin. The permissive codes are the latest editions of the International Property Maintenance Code, International Existing Building Code, International Performance Code, and International Swimming Pool and Spa Code. Adoption of the mandatory codes and permissive codes does not include the chapters, sections or provisions addressing administrative policies or procedures. Administrative policies and procedures are the sole responsibility of each local jurisdiction. If the governing body of a local jurisdiction desires to use the administrative provisions in one or more of the adopted codes, it must first adopt the chapters or sections by ordinance. In lieu of adopting the administrative provisions contained in the adopted codes, the governing body of a local jurisdiction may develop specific administrative policies and procedures for the operation o f its Building Inspection Department by ordinance. The latest edition of ICC/ANSI A117.1, Accessible and Usable Buildings and Facilities, is adopted by statute (S.C. Code Ann. § 10-5-210 et seq.), and is mandatory for use in all municipalities and counties within the State. 1 As modified, known as the 2024 South Carolina Building Code 2 As modified, known as the 2024 South Carolina Residential Code 3 As modified, known as the 2024 South Carolina Fire Code 4 As modified, known as the 2024 South Carolina Plumbing Code 5 As modified, known as the 2024 South Carolina Mechanical Code 6 As modified, known as the 2024 South Carolina Fuel Gas Code 1 2024 Building Code Modification Index (11/3/2025 V.1) Page 149 of 332 The South Carolina Legislature has enacted the Energy Standard Act (S.C. Code Ann. § 6-10-10 et seq.), and pursuant to the Energy Standard Act, the 2009 edition of the Inte rnational Energy Conservation Code has been statutorily adopted as the energy standard and is mandatory for use in all jurisdictions within the State. Additional information about the building codes adoption process can be found on the South Carolina Building Codes Council’s website. 2 2024 Building Code Modification Index (11/3/2025 V.1) Page 150 of 332 2024 SOUTH CAROLINA BUILDING CODES MODIFICATIONS INDEX Index # Code Modifications New/Continuation 2024 INTERNATIONAL BUILDING CODE (IBC) IBC 2024 01 [A] 101.4.7 Existing buildings Continuation IBC 2024 02 202 Definitions – Vapor retarder, ground contact & Primitive camp structure Continuation IBC 2024 03 303.4 Assembly Group A-3 (IFC 2024 03) Continuation IBC 2024 04 312.1 General Continuation IBC 2024 05 706.1 General Continuation IBC 2024 06 1010.2.13 Controlled egress doors in Group I-1, I-2 and I-4 (Adult Day Care Occupancy only) (IFC 2024 16) Continuation IBC 2024 07 1016.2 Egress through intervening spaces (IFC 2024 17) Continuation IBC 2024 08 1803.2 Investigation required Continuation IBC 2024 09 1907.4 Vapor retarder Continuation IBC 2024 10 2303.2.3 Other means during manufacture Continuation IBC 2024 11 [P] 2902.1.1 Fixture calculations (IPC 2024 11) Continuation IBC 2024 12 [P] 2902.2 Separate facilities (IPC 2024 12) Continuation IBC 2024 13 Appendix H Signs Continuation 2024 INTERNATIONAL RESIDENTIAL CODE (IRC) IRC 2024 01 R202 Definitions – Accepted Engineering Practice Continuation IRC 2024 02 R202 Definitions – Crawl Space Continuation IRC 2024 03 R202 Definitions – Sleeping Loft New from HBA of SC IRC 2024 04 R301.2.1 Wind design criteria Continuation IRC 2024 05 R301.2.2 Seismic provisions New from HBA of SC IRC 2024 06 R301.2.2.1 Determination of seismic design category Continuation IRC 2024 07 R302.1 Exterior Walls (adds exception #6) Continuation IRC 2024 08 R302.1 Exterior Walls (adds exception #7) Continuation IRC 2024 09 R302.2.7 Meter Location New from HBA of SC IRC 2024 10 R302.4.1 Through penetrations Continuation IRC 2024 11 R302.5.1 Opening protection Continuation IRC 2024 12 R302.13 Fire protection of floors Continuation IRC 2024 13 R304.1.1 Field treatment Continuation IRC 2024 14 305.1 Subterranean termite control methods Continuation IRC 2024 15 R305.4 Foam Plastic Protection Continuation IRC 2024 16 R305.5 Termite inspection strip Continuation IRC 2024 17 R309 Automatic Sprinkler Systems Continuation IRC 2024 03 R310.3 Location New from HBA of SC IRC 2024 03 R314.1 General New from HBA of SC 3 2024 Building Code Modification Index (11/3/2025 V.1) Page 151 of 332 Index # Code Modifications New/Continuation IRC 2024 03 Section R315 Sleeping Lofts New from HBA of SC IRC 2024 18 R316.3 Story above grade plane Continuation IRC 2024 19 R318.3.1 Floor elevations at the required egress doors New from HBA of SC IRC 2024 20 R318.7.5.1 Risers Continuation IRC 2024 03 R319.1 Emergency escape and rescue opening required New from HBA of SC IRC 2024 21 R321.1.1 Where required Continuation IRC 2024 22 R321.2 Window fall protection Continuation IRC 2024 23 R325.3 Mechanical ventilation Continuation IRC 2024 24 Figure R327.1 Minimum Fixture Clearances Continuation IRC 2024 25 R404.1.9.2 Masonry piers supporting floor girders Continuation IRC 2024 26 R408.3 Unvented crawl space Continuation IRC 2024 27 R408.3 Unvented crawl space Continuation IRC 2024 28 R408.4 Access Continuation IRC 2024 29 R408.8 Under-floor vapor retarder Continuation IRC 2024 30 R502.12.4 Truss design drawings Continuation IRC 2024 31 R506.3.3 Vapor retarder Continuation IRC 2024 32 R606.7 Piers Continuation IRC 2024 33 R802.10.1 Truss design drawings Continuation IRC 2024 34 Table R905.1.1(2) Underlayment application New from HBA of SC IRC 2024 35 R905.2.8.5 Drip Edge Continuation IRC 2024 36 Chapter 11 Energy Efficiency Continuation IRC 2024 37 M1411.9.1 Auxiliary and secondary drain systems New from HBA of SC IRC 2024 38 M1411.12 Insulation of refrigerant piping Continuation IRC 2024 39 M1411.15 Locking access port caps Continuation IRC 2024 40 M1502.3 Duct termination Continuation IRC 2024 41 M1502.4.2 Duct Installation Continuation IRC 2024 42 M1502.4.6 Duct length Continuation IRC 2024 43 M1503.6 Makeup air Continuation IRC 2024 44 M1504.3 Exhaust Openings Continuation IRC 2024 45 M1601.4.1 Joints, Seams and Connections Continuation IRC 2024 46 G2415.17.1 (404.17.1) Limitations (IFGC 2024 03) New from Omega Flex, Inc. IRC 2024 47 G2418.2 Design and installation Continuation IRC 2024 48 P2503.6 Shower liner test Continuation IRC 2024 49 P2503.6 Shower liner test New from HBA of SC IRC 2024 50 P2603.2.1 Protection against physical damage Continuation IRC 2024 51 P2603.5 Freezing Continuation IRC 2024 52 P2603.5 Freezing Continuation IRC 2024 53 P2705.1 General Continuation IRC 2024 54 P2705.1 General New from HBA of SC IRC 2024 55 P2708.4 Shower control valves Continuation IRC 2024 56 P2713.3 Bathtub and whirlpool bathtub valves Continuation 4 2024 Building Code Modification Index (11/3/2025 V.1) Page 152 of 332 Index # Code Modifications New/Continuation IRC 2024 57 P2903.10.3 Fixture valves and access New from HBA of SC IRC 2024 58 P2903.11 Hose bibb Continuation IRC 2024 59 P2904.2.4.2.1 Additional requirements for pendent sprinklers Continuation IRC 2024 60 E3601.7.3 Metering centers New from HBA IRC 2024 61 E3606.5 Surge protection Continuation IRC 2024 62 E3702.2 Branch-circuit ampere rating New from HBA IRC 2024 62 E3702.3 Ten-ampere branch circuits New from HBA IRC 2024 63 E3802.4 In unfinished basements Continuation IRC 2024 64 E3901.4.2 Island and peninsular countertops and work surfaces New from HBA of SC IRC 2024 64 E3901.4.3 Receptacle outlet location New from HBA of SC IRC 2024 65 E3902 Ground-Fault and Arc-Fault Circuit-Interrupter Protection Continuation IRC 2024 66 E3902.5 Basement receptacles Continuation IRC 2024 67 E3902.12 Specific appliance outlets New from HBA of SC IRC 2024 68 E3902.14 Outdoor outlets (NEC 2023 02) Continuation IRC 2024 69 E3902.21 Arc-fault circuit-interrupter protection Continuation IRC 2024 70 E4002.11 Bathtub and shower space New from HBA of SC IRC 2024 71 E4002.14 Tamper-resistant receptacles Continuation IRC 2024 72 Chapter 44 Referenced Standards Continuation IRC 2024 73 Chapter 44 Referenced Standards (IMC 2024 02) New from Daikin Comfort IRC 2024 74 Appendix BF Patio Covers Continuation IRC 2024 75 Appendix BO Existing Buildings and Structures Continuation IRC 2024 76 Appendix BB Tiny Houses Continuation 2024 INTERNATIONAL FIRE CODE (IFC) IFC 2024 01 202 General definitions – Primitive camp structure Continuation IFC 2024 02 202 General definitions – Recreational fire Continuation IFC 2024 03 [BG] 203.2.8 Assembly Group A-3 (IBC 2024 03) Continuation IFC 2024 04 315.3.3 Equipment rooms Continuation IFC 2024 05 503.1.2 Additional access Continuation IFC 2024 06 503.2.1 Dimensions Continuation IFC 2024 07 507.1 Required water supply Continuation IFC 2024 08 507.5.1 Where required Continuation IFC 2024 09 507.5.1.1 Hydrant for standpipe systems Continuation IFC 2024 10 507.5.4 Obstruction Continuation IFC 2024 11 606.3.3.2 Grease accumulation New from Midlands Fire Marshal Association IFC 2024 12 607.1 General Continuation IFC 2024 13 901.6.3 Records Continuation 5 2024 Building Code Modification Index (11/3/2025 V.1) Page 153 of 332 Index # Code Modifications New/Continuation IFC 2024 16 1010.2.13 Controlled egress doors in Group I-1, I-2 and I-4 (Adult Day Care Occupancy only) (IBC 2024 06) Continuation IFC 2024 17 1016.2 Egress through intervening spaces (IBC 2024 07) Continuation IFC 2024 18 1032.11 Maintenance of the listed occupancy load signage New from Midlands Fire Marshal Association IFC 2024 19 2303.2 Emergency disconnect switches New from Midlands Fire Marshal Association IFC 2024 20 2303.2.2 Testing Continuation IFC 2024 21 2304.3.6 Communications New from Midlands Fire Marshal Association IFC 2024 22 2305.5 Fire extinguishers Continuation IFC 2024 23 2307.4 Location of dispensing operations and equipment Continuation IFC 2024 24 2307.7 Public fueling of motor vehicles Continuation IFC 2024 25 4106.6 Clearance Requirements Continuation IFC 2024 26 6101.1 Scope Continuation IFC 2024 27 6104.2 Maximum capacity within established limits New from Southeast Propane Alliance (SEPA) IFC 2024 28 6106.1 Attendants Continuation IFC 2024 29 6107.3 Clearance to combustibles New from Southeast Propane Alliance (SEPA) IFC 2024 30 6107.4 Protecting containers from vehicles Continuation IFC 2024 31 6109.13 Protection of containers Continuation IFC 2024 32 6110.1 Removed from service New from Southeast Propane Alliance (SEPA) IFC 2024 33 6111.2.1 Near residential, educational and institutional occupancies and other high-risk areas Continuation IFC 2024 34 6111.2.1 Near residential, educational and institutional occupancies and other high-risk areas New from Southeast Propane Alliance (SEPA) 2024 INTERNATIONAL PLUMBING CODE (IPC) IPC 2024 01 202 General Definitions – Drinking Fountain Continuation IPC 2024 02 202 General Definitions – Bottle-Filling Station Continuation IPC 2024 03 202 General Definitions – Water Cooler Continuation IPC 2024 04 202 General Definitions – Water Dispenser Continuation IPC 2024 05 403.1.1 Fixture calculations (IBC 2024 11) Continuation IPC 2024 06 403.2 Separate facilities (IBC 2024 12) Continuation 2024 INTERNATIONAL MECHANICAL CODE (IMC) IMC 2024 01 504.9.2 Duct Installation Continuation IMC 2024 02 Table 1103.1 Refrigerant Classification, Amount and OEL (IRC 2024 73) New from Daikin Comfort 6 Page 154 of 332 Index # Code Modifications New/Continuation IMC 2024 03 1109.2.5 Refrigerant pipe shafts New from Johnson and Associates IMC 2024 04 1109.3.2 Shaft ventilation New from Daikin Comfort IMC 2024 02 Chapter 15 Referenced Standards New from Daikin Comfort 2024 INTERNATIONAL FUEL GAS CODE (IFGC) IFGC 2024 01 401.9 Identification Continuation IFGC 2024 02 401.10 Third-party testing and Certification Continuation IFGC 2024 03 404.17.1 Limitations (IRC 2024 46) New from Omega Flex, Inc. IFGC 2024 04 412.4 Listed equipment Continuation IFGC 2024 05 412.6 Location Continuation IFGC 2024 06 412.8.3 Vehicle impact protection Continuation IFGC 2024 07 412.10 Private fueling of motor vehicles Continuation IFGC 2024 08 505.1.1 Commercial cooking appliances vented by exhaust hoods Continuation 2023 NATIONAL ELECTRICAL CODE (NEC) NEC 2023 01 210.8(A) Dwelling Units Continuation NEC 2023 02 210.8(F) Outdoor Outlets (IRC 2024 68) Continuation NEC 2023 03 210.12(B) Dwelling Units Continuation 7 Page 155 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 01 Code Section: [A] 101.4.7 Existing Buildings Proponent: American Concrete Institute (ACI) Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 01 [A] 101.4.7 Reason: To establish minimum requirements for the evaluation, design, construction, repair and rehabilitation of concrete structural elements in existing buildings. Modification: [A] 101.4.7 Existing buildings. The provisions of the International Existing Building Code shall apply to matters governing the repair, alternation, change of occupancy, addition to and relocation of existing buildings. 101.4.7.1 Structural concrete. In addition, assessment, repairs, and restoration of structural concrete in accordance with ACI 562 shall be permitted. Exception: ACI 562 shall not be used for the evaluation or design of repairs or rehabilitation of elements of seismic force-resisting system that result in strength, stiffness, or ductility of those elements different from the pre-damage condition. (Add new referenced standard to Chapter 35 as follows) ACI American Concrete Institute 38800 Country Club Drive Farmington Hills, MI 48331 Standard reference number Title Referenced in code section number 562-19 Code Requirements for Assessment, Repair, and Rehabilitation of Existing Concrete Structures 101.4.7.1 8 2024 Building Code Modification Index (11/3/2025 V.1) Page 156 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 02 Code Section: 202 Definitions Vapor Retarder, Ground Contact (new definition) Primitive Camp Structure (new definition) Proponent: Building Officials Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 02 202 IBC 2018 IBC 2018 01 202 Reason: To provide clear definitions and uniform interpretation of the phrases. Modification: 202 Definitions: Vapor Retarder, Ground Contact: Ground contact vapor retarder class shall be defined using the requirements of ASTM E1745, Class A, B, or C -Standard specification for water vapor retarders used in contact with soil or granular fill under concrete slabs. Primitive Camp Structure: Shall include any structure permanent or temporary in nature, used for outdoor camping (transient), open on at least one side with no fully enclosed habitable spaces, less than 400 square feet under roof, and not classified as a res idential occupancy due to lack of electrical, plumbing, mechanical and sprinkler systems. 9 2024 Building Code Modification Index (11/3/2025 V.1) Page 157 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 03 Code Section: 303.4 Assembly Group A-3 Proponent: Building Officials Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 04 303.4 IBC 2018 IBC 2018 02 303.4 Reason: Add to the listing of A-3 occupancies the following use: Structures, without a commercial kitchen, used in agritourism activity as defined by S.C. Code Ann. 46-53-10(1). Modification: 303.4 Assembly Group A-3. Group A-3 occupancy includes assembly uses intended for worship, recreation or amusement and other assembly uses not classified elsewhere in Group A including, but not limited to: Amusement arcades Art galleries Bowling alleys Community halls Courtrooms Dance halls (not including food or drink consumption) Exhibition halls Funeral parlors Greenhouses for the conservation and exhibition of plants that provide public access Gymnasiums (without spectator seating) Indoor swimming pools (without spectator seating) Indoor tennis courts (without spectator seating) Lecture halls Libraries Museums Places of religious worship Pool and billiard parlors Structures, without a commercial kitchen, used in agritourism activity as defined by S.C. Code Ann. 46-53-10(1) Waiting areas in transportation terminals 10 2024 Building Code Modification Index (11/3/2025 V.1) Page 158 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 04 Code Section: 312.1 General Proponent: Building Officials Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 05 312.1 IBC 2018 IBC 2018 03 312.1 Reason: “Structures primarily used or associated with outdoor camping activities” include, but are not limited to, shelters, tree stands, sheds, rustic cabins, campfire shelters, shelters, tents, tepees, or other indigenous huts used only for campers or program participants, or used in conjunction with outdoor camping activities such as hiking, fishing, hunting, or nature appreciation, regardless of material used for construction. These structures are not to inclu de utilities such as mechanical, electrical or plumbing. Requiring that at least one side of the building be open will provide ventilation for any outside hearing source or propane lighting that may be used within the structure, and provide a clear path of egress travel to the outside. Limiting the size to 400 square feet will require larger buildings to be classified as a residential structure. Not allowing electrical, plumbing or mechanical systems will maintain the integrity of a primitive structure. Modification: 312.1 General. Buildings and structures of an accessory character and miscellaneous structures not classified in any specific occupancy shall be constructed, equipped and maintained to conform to the requirements of this code commensurate with the fire and life hazard incidental to their occupancy. Group U shall include, but not be limited to, the following: Agricultural buildings Aircraft hangars, accessory to a one- or two-family residence (see Section 412.4) Barns Carports Communication equipment structures with a gross floor area of less than 1,500 square feet (139 m2) Fences more than 7 feet (2134 mm) in height Grain silos, accessory to a residential occupancy Livestock shelters Primitive Camp Structures Private garages Retaining walls Sheds Stables Tanks Towers 11 2024 Building Code Modification Index (11/3/2025 V.1) Page 159 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 05 Code Section: 706.1 General Proponent: Building Officials Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 07 706.1 IBC 2018 IBC 2018 05 706.1 Reason: Unusually restrictive —in an attempt to clarify this section for the purpose of uniform enforcement, the ICC created a huge error which takes away the designers’ options to leave an existing, nonconforming building alone when separated by a fire wall. The intent was to show that the fire protection systems, utilities, access, and egress could be one system when a fire wall is utilized, and do not have to be separate systems due to the fire wall creating different buildings. This requirement would unjustly and significantly drive up the cost of construction as it relates to additions to existing buildings. Modification: 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. Each portion of a building separated by one or more firewalls may be considered a separate building. The extent and location of such fire walls shall provide a complete separation. Where a fire wall separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. 12 2024 Building Code Modification Index (11/3/2025 V.1) Page 160 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 06 Code Section: 1010.2.13 Controlled egress doors in Group I-1, I-2 and I-4 (Adult Day Care Occupancy only) Proponent: Midlands Fire Marshal Association Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 10 1010.2.14 Reason: To prevent nuisance alarms and reduce elopement issues when serving clients with Dementia or Alzheimer’s, or similar health care issues. Modification: 1010.2.13 Controlled egress doors in Groups I-1, I-2, and I-4 (Adult Day Care Occupancy only). Controlled egress electrical locking systems where egress is controlled by authorized personnel shall be permitted on doors in the means of egress in Group I -1, I-2, and I-4 (Adult Day Care occupancy only) occupancies where the clinical needs of persons receiving care require their containment. Controlled egress doors shall be permitted in such occupancies where the building is equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1 or an approved automatic smoke detectio n system installed in accordance with Section 907, provided that the doors are installed and operate in accordance with all of the following: 1. The door's electric locks shall unlock on actuation of the automatic sprinkler system or automatic smoke detection system allowing immediate free egress. 2. The door's electric locks shall unlock on loss of power to the electrical locking system or to the electric lock mechanism allowing immediate free egress. 3. The electric locking system shall be installed to have the capability of unlocking the electric locks by a switch located at the fire command center, a nursing station or other approved location. The switch shall directly break power to the electric lock. 4. A building occupant shall not be required to pass through more than one door equipped with a controlled egress locking system before entering an exit. 5. The procedures for unlocking the doors shall be described and approved as part of the emergency planning and preparedness required by Chapter 4 of the International South Carolina Fire Code. 6. All clinical staff shall have the keys, codes or other means necessary to operate the controlled egress electrical locking systems. 7. Emergency lighting shall be provided at the door. 8. The electromechanical or electromagnetic locking device shall be listed in accordance with either UL 294 or UL 1034. Exceptions: 1. Items 1 through 4 shall not apply to doors to areas occupied by persons who, because of clinical needs, require restraint or containment as part of the function of a psychiatric or cognitive treatment area. 2. Items 1 through 4 shall not apply to doors to areas where a listed egress control system is utilized to reduce the risk of child abduction from nursery and obstetric areas of a Group I-2 hospital. 13 2024 Building Code Modification Index (11/3/2025 V.1) Page 161 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 07 Code Section: 1016.2 Egress through intervening spaces Proponent: Building Officials Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 11 1016.2 IBC 2018 IBC 2018 10 1016.2 Reason: This is a longstanding modification that was updated in 2018 based on changes in the 2018 IBC. The modification provides additional egress options by adding the exceptions below. Modification: 1016.2 Egress through intervening spaces. Egress through in tervening spaces shall comply with this section. 1. Exit access through an enclosed elevator lobby is permitted. Where access to two or more exits or exit access doorways is required in Section 1006.2.1, access to not less than one of the required exits shall be provided without travel through the enclosed elevator lobbies required by Section 3006 of the South Carolina Building Code . Where the path of exit access travel passes through an enclosed elevator lobby, the level of protection required for the enclosed elevator lobby is not required to be extended to the exit unless direct access to an exit is required by other sections of this code. 2. In other than Group H occupancies, egress from a room or space is allowed to pass through adjoining or intervening rooms or areas provided that such adjoining rooms or areas and the area served are accessory to one or the other and provide a discernible path of egress travel to an exit. 3. In Group H occupancies, egress from a room or space is allowed to pass through adjoining or intervening rooms or areas provided that such adjoining rooms or areas are the same or lesser hazard occupancy group and provide a discernible path of egress travel to an exit. 4. An exit access shall not pass through a room that can be locked to prevent egress. Exception: An electrically locked exit access door providing egress from an elevator lobby shall be permitted in accordance with Section 1010.2.14. 5. Means of egress from dwelling units or sleeping areas shall not lead through other sleeping areas, toilet rooms or bathrooms. Exception: Dwelling units or sleeping areas in R -1 and R-2 occupancies shall be permitted to egress through other sleeping areas serving adjoining rooms that are part of the same dwelling unit or guest room. (Page 2 of IBC 2024 07 - Section 1016.2) 14 2024 Building Code Modification Index (11/3/2025 V.1) Page 162 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index 6. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes. Exceptions: 1. Means of egress are not prohibited through a kitchen area serving adjoining rooms constituting part of the same dwelling unit or sleeping unit. 2. Means of egress are not prohibited through stockrooms in Group M occupancies where all of the following are met: 2.1. The stock is of the same hazard classification as that found in the main retail area. 2.2. Not more than 50 percent of the exit access is through the stockroom. 2.3. The stockroom is not subject to locking from the egress side. 2.4. There is a demarcated, minimum 44 -inch-wide (1118 mm) aisle defined by full- or partial-height fixed wall s a wall not less than 42 inches (1067 mm) high or similar construction that will maintain the required width and lead directly from the retail area to the exit without obstructions. 15 2024 Building Code Modification Index (11/3/2025 V.1) Page 163 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 08 Code Section: 1803.2 Investigations required Proponent: Building Officials Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 14 1803.2 IBC 2018 IBC 2018 11 1803.2 Reason: The IBC requires a geotechnical investigation for all projects regardless of size. The only exception which allows the building official to waive the requirements puts unnecessary liability on the building official to determine if adequate information can be gathered from adjacent sites. In areas that must account for seismic activity, the conditions may vary in as few as 100 yards. For large commercial projects, the soil conditions may have a drastic effect on the design of the structure; however, for smaller projects the soil condition has significantly less bearing on its design. It is often determined on small projects that the soil conditions do not have an effect on the design of the structure. See ASCE 7 -20-3-1, Exception. Each of the equations results in a period of vibration of less than 0.5 seconds and exceeds the size of a typical one-story structure. Modification: 1803.2 Investigations required. Geotechnical investigations shall be conducted in accordance with Sections 1803.3 through 1803.5. Exceptions: 1. The building official shall be permitted to waive the requirement for a geotechnical investigation where satisfactory data from adjacent areas is available that demonstrates an investigation is not necessary for any of the conditions in Sections 1803.5.1 through 1803.5.6 and Sections 1803.5.10 and 1803.5.11. 2. For single story buildings not more than 5,000 sq ft and not more than 30ft in height, a site specification investigation report is not required if the seismic design category is determined by the design professional in accordance with Chapter 20 of ASCE 7. 16 2024 Building Code Modification Index (11/3/2025 V.1) Page 164 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 09 Code Section: 1907.4 Vapor retarder Proponent: Structural Engineers Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 16 1907.1 IBC 2018 IBC 2018 12 1907.1 Reason: To bring the IBC into compliance with the American Concrete Institute’s standards. Modification: 1907.4 Vapor retarder. A 6-mil (0.006 inch; 0.15 mm) 10-mil (0.010 inch) polyethylene ground contact vapor retarder with joints lapped not less than 6 inches (152 mm) shall be placed between the base course or subgrade and the concrete floor slab, or other approved equivalent methods or materials shall be used to retard vapor transmission through the floor slab. Exception: A vapor retarder is not required: 1. For detached structures accessory to occupancies in Group R-3, such as garages, utility buildings or other unheated facilities. 2. For unheated storage rooms having an area of less than 70 square feet (6.5 m2) and carports attached to occupancies in Group R-3. 3. For buildings of other occupancies where migration of moisture through the slab from below will not be detrimental to the intended occupancy of the building. 4. For driveways, walks, patios and other flatwork that will not be enclosed at a later date. 5. Where approved based on local site conditions. 17 2024 Building Code Modification Index (11/3/2025 V.1) Page 165 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 10 Code Section: 2303.2.3 Other means during manufacture Proponent: Building Officials Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 17 2303.2.2 IBC 2018 IBC 2018 13 2303.2.2 Reason: The language in the 2018 code would prevent the use of methods for the treatment of fire - retardant treated wood that have been in use since at least 2009. We’re not aware of any issues with products that have been tested in accordance with code requirements. Modification: [BF] 2303.2.3 Other means during manufacture. For wood products impregnated with chemicals by other means during manufacture, the treatment shall be an integral part of the manufacturing process of the wood product. The treatment shall provide permanent protection to all surfaces of the wood product. The use of paints, coating, stains or other surface treatments is not an approved method of protection as required in this section. 18 2024 Building Code Modification Index (11/3/2025 V.1) Page 166 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 11 Code Section: [P] 2902.1.1 Fixture calculations Emergency Code Modification Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 19 [P] 2902.1.1 Reason: Gender-neutral gang-type bathrooms pose a serious threat to the health and safety of all by increasing the incident of sexual violence against women and children, as well as increasing the incident of wrongful accusations of assault, voyeurism, and the like. Gender -neutral gang-type bathrooms also undermine and reduce the “safe spaces” for victims of human trafficking, as well as discriminating against women and children by disproportionately decreasing the available number of bathroom spaces for women and children, while men will have access to both water closet compartments and urinal spaces. In addition, the common use sink space discriminates against women and children by disproportionately decreasing the area available for women to address personal needs, such as menstrual or other medical care, nursing and baby changing activities. Modification: [P] 2902.1.1 Fixture calculations. To determine the occupant load of each sex, the total occupant load shall be divided in half. To determine the required number of fixtures, the fixture ratio or ratios for each fixture type shall be applied to the occupant load of each sex in accordance with Table 2902.1. Fractional numbers resulting from applying the fixture ratios of Table 2902.1 shall be rounded up to the next whole number. For calculations involving multiple occupancies, such fractional numbers for each occupancy shall first be summed and then rounded up to the next whole number. Exceptions: 1. The total occupant load shall not be required to be divided in half where approved statistical data indicates a distribution of the sexes of other than 50 percent of each sex. 2. Where multiple-user facilities are designed to serve all genders, the minimum fixture count shall be calculated 100 percent, based on total occupant load. In such multiple-user user facilities, each fixture type shall be in accordance with ICC A117.1 19 2024 Building Code Modification Index (11/3/2025 V.1) Page 167 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 12 Code Section: [P] 2902.2 Separate facilities Emergency Code Modification Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 20 [P] 2902.2 Reason: Exception 6 is not necessary, as Exceptions 1 -5 provide sufficient guidance and latitude for business, schools, churches and other similar large-capacity spaces, to provide gender-neutral spaces with adequate privacy protections. Modification: [P] 2902.2 Separate facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. Exceptions: 1. Separate toilet facilities shall not be required for dwelling units and sleeping units. 2. Separate toilet facilities shall not be required in structures or tenant spaces with a total occupant load, including both employees and customers, of 15 or fewer. 3. Separate toilet facilities shall not be required in mercantile occupancies in which the maximum occupant load is 100 or fewer. 4. Separate toilet facilities shall not be required in business occupancies in which the maximum occupant load is 25 or fewer. 5. Separate toilet facilities shall not be required to be designated by sex where single -user toilet rooms are provided in accordance with Section 2902.1.2. 6. Separate toilet facilities shall not be required where rooms having both water closets and lavatory fixtures are designed for use by all persons regardless of sex and privacy is provided for water closets in accordance with Section 405.3.4 of the International Plumbing Code and for urinals in accordance with Section 405.3.5 of the International Plumbing Code. 20 2024 Building Code Modification Index (11/3/2025 V.1) Page 168 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 13 Code Section: Appendix H Signs Proponent: Structural Engineers Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 18 Appendix H IBC 2018 IBC 2018 14 Appendix H IBC 2015 IBC 2015 07 Appendix H IBC 2012 IBC 2012 05 Appendix H Reason: To provide minimum requirements for signs for the protection of people and property. Modification: Appendix H Signs The provisions in Appendix H are adopted for use statewide. Appendix H gathers in one place the various standards that regulate the construction and protection of outdoor signs. Wherever possible, the appendix provides standards in performance language, thus allowing the widest possible application. 21 2024 Building Code Modification Index (11/3/2025 V.1) Page 169 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 01 Code Section: R202 Definitions: Accepted Engineering Practice Proponent: Coastal Code Enforcement Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 01 R202 IRC 2018 IRC 2018 01 R202 IRC 2015 IRC 2015 01 R202 IRC 2012 IRC 2012 01 R202 Reason: To provide a clear definition and uniform interpretation of the phrase. Modification: A definition of “Accepted Engineering Practice” was added: Accepted Engineering Practice . The performance design of structures and/or structural elements that vary from prescriptive design methods of this code. Such design shall be made with accepted design standards by a South Carolina licensed Architect or Engineer as permitted by existing state law. 22 2024 Building Code Modification Index (11/3/2025 V.1) Page 170 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 02 Code Section: R202 Definitions: Crawl Space Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 02 R202 Reason: To provide additional clarification. Modification: R202 Definitions [RB] CRAWL SPACE. An underfloor space that is not a basement. Spaces under decks and porches that do not contain mechanical equipment and are separated by a foundation wall are not to be considered crawlspaces. 23 2024 Building Code Modification Index (11/3/2025 V.1) Page 171 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 03 Code Section: R202 Definitions: Sleeping Loft R.310.3 Location R314.1 General Section R315 Sleeping Lofts R319.1 Emergency escape and rescue opening required Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: The section is overly restrictive, hard to apply and duplicates existing safety rules. Modification: R202 Definitions [RB] SLEEPING LOFT. A space designated for sleeping on an intermediate level or levels between the floor and ceiling of a story, open on one or more sides to the room in which the space is located, and in accordance with Section R315. (delete section without substitution) R310.3 Location. Smoke alarms shall be installed in the following locations: 1. In each sleeping room. 2. Outside each separate sleeping area in the immediate vicinity of the bedrooms. 3. On each additional story of the dwelling unit, including basements and habitable attics and not including crawl spaces and uninhabita ble attics. In dwelling units with split levels and without an intervening door between the adjacent levels, a smoke alarm installed on the upper level shall suffice for the adjacent lower level provided that the lower level is less than one full story below the upper level. 4. Not less than 3 feet (914 mm) horizontally from the door or opening of a bathroom that contains a bathtub or shower unless this would prevent placement of a smoke alarm required by this section. 5. In the hallway and in the room open to the hallway in dwelling units where the ceiling height of a room open to a hallway serving bedrooms exceeds that of the hallway by 24 inches (610 mm) or more. 6. Within the room to which a sleeping loft is open, in the immediate vicinity of the sleeping loft . 24 2024 Building Code Modification Index (11/3/2025 V.1) Page 172 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index (page 2 of IRC 2024 03 - R202, R310.1, etc.) R314.1 General. Mezzanines shall comply with Sections R314.2 through R314.5. Exception: Sleeping lofts in dwelling units and sleeping units shall be permitted to comply with Section R315, subject to the limitations in Section R315.2. SECTION R315 SLEEPING LOFTS (Delete section without substitution) R319.1 Emergency escape and rescue opening required. Basements, habitable attics, the room to which a sleeping loft is open, and every sleeping room shall have not less than one operable emergency escape and rescue opening . Where basements contain one or more sleeping rooms, an emergency escape and rescue opening shall be required in each sleeping room. Emergency escape and rescue openings shall open directly into a public way, or to a yard or court that opens to a public way. Exceptions: 1. Basements used only to house mechanical equipment not exceeding a total floor area of 200 square feet (18.58 m2). 2. Storm shelters constructed in accordance with ICC 500. 3. Where the dwelling unit or townhouse unit is equipped with an automatic sprinkler system installed in accordance with Section P2904, sleeping rooms in basements shall not be required to have emergency escape and rescue openings provided that the basement has one of the following: 3.1. One means of egress complying with Section R318 and one emergency escape and rescue opening. 3.2. Two means of egress complying with Section R318. 4. A yard shall not be required to open directly into a public way where the yard opens to an unobstructed path from the yard to the public way. Such path shall have a width of not less than 36 inches (914 mm). 25 2024 Building Code Modification Index (11/3/2025 V.1) Page 173 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 04 Code Section: R301.2.1 Wind design criteria Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 04 Reason: Provides added consistency and ease. Modification: R301.2.1 Wind design criteria. Buildings and portions thereof shall be constructed in accordance with the wind provisions of this code using the ultimate design wind speed in Table R301.2 as determined from Figure R301.2(2) American Society of Civil Engineers (ASCE) Hazard Tool. The local building official may delineate the wind design category within their jurisdiction, as long as, it does not surpass those provided on the American Society of Civil Engineers (ASCE) Hazard Tool website. The structural provisions of this code for wind loads are not permitted where wind design is required as specified in Section R301.2.1.1. Where different construction methods and structural materials are used for various portions of a building, the applicable requirements of this section for each portion shall apply. Where not otherwise specified, the wind loads listed in Table R301.2.1(1) adjusted for height and exposure using Table R301.2.1(2) shall be used to determine design load performance requirements for wall coverings, curtain walls, roof coverings, exterior windows, skylights, garage doors and exterior doors. Asphalt shingles shall be designed for wind speeds in accordance with Section R905.2.4 . Metal roof shingles shall be designed for wind speeds in accordance with Section R905.4.4. A continuous load path shall be provided to transmit the applicable uplift forces in Section R802.11 from the roof assembly to the foundation. Where ultimate design wind speeds in Figure R301.2(2) are less than the lowest wind speed indicated in the prescriptive provisions of this code, the lowest wind speed indicated in the prescriptive provisions of this code shall be used. 26 2024 Building Code Modification Index (11/3/2025 V.1) Page 174 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 05 Code Section: R301.2.2 Seismic provisions Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: The structural requirements add cost without significant safety benefit in low -to-moderate seismic rick areas. Modification: (removes “C” from #1 below) R301.2.2 Seismic provisions. Buildings within the scope of this code as defined in Section R101.2 shall be constructed in accordance with the requirements of this section and other seismic requirements of this code. The seismic provisions of this code shall apply as follows: 1. Townhouses and buildings as permitted by the exceptions to Section R101.2 containing three or more dwelling units in Seismic Design Categories C, D0, D 1 and D2. 2. Detached one- and two-family dwellings and buildings as permitted by the exceptions to Section R101.2 containing less than three dwelling units in Seismic Design Categories D0, D 1 and D2. Buildings in Seismic Design Category E shall be designed to resist seismic loads in accordance with the International Building Code , except where the seismic design categ ories are reclassified to lower seismic design categories in accordance with Section R301.2.2.1. Components of buildings not required to be designed to resist seismic loads shall be constructed in accordance with the provisions of this code. 27 2024 Building Code Modification Index (11/3/2025 V.1) Page 175 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 06 Code Section: R301.2.2.1 Determination of seismic design category Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 04 Reason: Provides added consistency and ease. Modification: R301.2.2.1 Determination of seismic design category. Buildings shall be assigned a seismic design category in accordance with the American Society of Civil Engineers (ASCE) Hazard Tool . Figures R301.2.2.1(1) through R301.2.2.1(7), except as otherwise required by Section R401.4. The local building official may delineate the seismic design category within the jurisdiction, as long as, it does not surpass those provided on the American Society of Civil Engineers (ASCE) Hazard Tool website. 28 2024 Building Code Modification Index (11/3/2025 V.1) Page 176 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 07 Code Section: R302.1 Exterior Walls (adds exception #6) Proponent: Coastal Code Enforcement Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 06 R302.1 IRC 2018 IRC 2018 04 R302.1 IRC 2015 IRC 2015 01 R302.1 IRC 2012 IRC 2012 02 R302.1 Reason: To provide a clear definition and uniform interpretation of the phrase Modification: R302.1 Exterior walls. Construction, projections, openings and penetrations of exterior walls of dwellings, townhouses and accessory buildings shall comply with Table R302.1(1) based on fire separation distance; or dwellings and townhouses equipped throughout with an automatic sprinkler system installed in accordance with Section P2904 shall comply with Table R302.1(2) based on fire separation distance. For the purposes of determining fire separation distance, dwellings and townhouses on the same lot shall be assumed to have an imaginary line between them. Where a new dwelling or townhouse is to be erected on the same lot as an existing dwelling or townhouse, the location of the assumed imaginary line with relation to the existing dwelling or townhouse shall be such that the exist ing dwelling or townhouse meets requirements of this section. Where a lot line exists between adjacent townhouse units, fire separation distance of exterior walls shall be measured to the lot line. Where a lot line does not exist between adjacent townhouse units, an imaginary line shall be assumed between the adjacent townhouse units and fire separation distance of exterior walls shall be measured to the imaginary line. Fire separation distance and requirements of Section R302.1 shall not apply to walls separating townhouse units that are required by Section R302.2. Exceptions: 1. Walls, projections, openings or penetrations in walls perpendicular to the line used to determine the fire separation distance. 2. Walls of individual dwelling units and their accessory buildings located on the same lot. 3. Detached tool sheds and storage sheds, playhouses and similar structures exempted from permits are not required to provide wall protection based on location on the lo t. Projections beyond the exterior wall shall not extend over the lot line. 29 2024 Building Code Modification Index (11/3/2025 V.1) Page 177 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index (page 2 of IRC 2024 07- R302.1) 4. Detached garages accessory to a dwelling unit located within 2 feet (610 mm) of a lot line are permitted to have roof eave projections not exceeding 4 inches (102 mm). 5. Foundation vents installed in compliance with this code are permitted. 6. Fire separation distance. a. The minimum fire separation distance for improvement constructed on a lot shown on: [ i ] a recorded bonded or final subdivision plat, or [ii] a sketch plan, site plan, plan of phased development or preliminary plat approved by the local governing authority, which was recorded or approved prior to the implementation of 2012 International Residential Code and which shows or describes lesser setbacks than the fire separation distances provided in Table R302.1(1), shall be equal to the lesser setbacks, but in no event less than 3 feet (914 mm). b. The minimum fire separation distance for improvements constructed on a lot where the local governing authority has, prior to the implementation of 2012 International Residential Code: [ i ] accepted exactions or issued conditions, [ ii ] granted a special exception, [ iii ] entered into a development agreement, [ iv ] approved a variance, [ v ] approved a planned development district, or [ vi ] otherwise approved a specific development plan which contemplated or provided for setbacks less than the fire separation distances provided in Table R302.1(1), shall be equal to the lesser setback, but in no event less than 3 feet (914 mm). 30 2024 Building Code Modification Index (11/3/2025 V.1) Page 178 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 08 Code Section: R302.1 Exterior Walls (adds exception #7) Proponent: Building Official’s Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 06 R302.1 Reason: To account for eave projections on townhomes. Modification: (Modification adds below exception to prior modification IRC 2024 07 for Section R302.1 Exterior walls) Exceptions: 7. Aesthetic roof and siding projections may extend beyond the common wall of a townhouse unit over an adjoining unit's property line as long as the construction of the projection does not damage the integrity of the fire -rated assembly, the projection is completely supported by the common wall, the projection is protected by a 1 -hour construction or fire retardant -treated wood, and the projection is limited to 18 inches (457 mm). These projections shall not contain any plumbing, electrical or mechanical installations. An easement may be required by the jurisdiction to ensure future access to this projection for repair and maintenance. 31 2024 Building Code Modification Index (11/3/2025 V.1) Page 179 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 09 Code Section: R302.2.7 Meter Location (new section) Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: Provides design and installation flexibility. Aligns with utility company practices and NEC requirements. Maintains fire-resistance integrity of common walls. Clarifies enforcement for local building officials and reduces conflicts during plan review. Modification: R.302.2.7 Meter Location. Installation of multiple electrical meters on the exterior wall of townhomes is permitted, provided the installation does not breach the fire-resistance-rated wall assembly. 32 2024 Building Code Modification Index (11/3/2025 V.1) Page 180 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 10 Code Section: R302.4.1 Through penetrations Proponent: Building Official’s Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 09 R302.4.1 Reason: The common walls between townhouses are essentially property lines between adjacent owners, and utilities or services of any kind should not pass through a property line. Modification: R302.4.1 Through penetrations. Through penetrations of fire-resistance-rated wall or floor assemblies shall comply with Section R302.4.1.1 or R302.4.1.2. No penetrations shall pass completely through the fire-rated assembly separating townhouse units. Exceptions: 1. Where the penetrating items are steel, ferrous or copper pipes, tubes or conduits, the annular space shall be protected as follows: 1.1. In concrete or masonry wall or floor assemblies, concrete, grout or mortar shall be permitted where installed to the full thickness of the wall or floor assembly or the thickness required to maintain the fire-resistance rating, provided that both of the following are complied with: 1.1.1. The nominal diameter of the penetrating item is not more than 6 inches (152 mm). 1.1.2. The area of the opening through the wall does not exceed 144 square inches (92 900 mm2). 1.2. The material used to fill the annular space shall prevent the passage of flame and hot gases sufficient to ignite cotton waste where subjected to ASTM E119 or UL 263 time temperature fire conditions under a positive pressure differential of not less than 0.01 inch of water (3 Pa) at the location of the penetration for the time period equivalent to the fire -resistance rating of the construction penetrated. 2. The annular space created by the penetration of water -filled fire sprinkler piping, provided that the annular space is filled using a material complying with Item 1.2 of Exception 1. 33 2024 Building Code Modification Index (11/3/2025 V.1) Page 181 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 11 Code Section: R302.5.1 Opening protection Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 10 R302.5.1 IRC 2018 IRC 2018 05 R302.5.1 IRC 2015 IRC 2015 05 R302.5.1 Reason: Lack of supporting documentation proving that self -closing devices contribute to fire or carbon monoxide safety. Modification: R302.5.1 Opening protection. Openings from a private garage directly into a room used for sleeping purposes shall not be permitted. Other openings between the garage and dwelling unit shall be equipped with solid wood doors not less than 1 3/8 inches (35 mm) in thickness, solid or hon eycomb-core steel doors not less than 1 3/8 inches (35 mm) thick, or 20-minute fire-rated doors. Doors shall be self-latching and equipped with a self-closing or automatic-closing device. 34 2024 Building Code Modification Index (11/3/2025 V.1) Page 182 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 12 Code Section: R302.13 Fire protection of floors Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 11 R302.13 IRC 2018 IRC 2018 06 R302.13 IRC 2015 IRC 2015 06 R302.13 Reason: Requirements are unwarranted and unnecessary. Modification: R302.13 Fire protection of floors. Floor assemblies that are not required elsewhere in this code to be fire- resistance rated, shall be provided with a 1/2-inch (12.7 mm) gypsum wallboard membrane, 5/8-inch (16 mm) wood structural panel membrane, or equivalent on the underside of the floor f raming member. Penetrations or openings for ducts, vents, electrical outlets, lighting, devices, luminaires, wires, speakers, drainage, piping and similar openings or penetrations shall be permitted. Exceptions: 1. Floor assemblies located directly over a space protected by an automatic sprinkler system in accordance with Section P2904, NFPA 13D, or other approved equivalent sprinkler system. 2. Floor assemblies located directly over a crawl space not intended for storage or for the installation of fuel-fired or electric-powered heating appliances. Floor assemblies located directly over a crawl space. 3. Portions of floor assemblies shall be permitted to be unprotected where complying with the following: 3.1. The aggregate area of the unprotected portions does not exceed 80 square feet (7.4 m2) per story. 3.2. Fireblocking in accordance with Section R302.11.1 is installed along the perimeter of the unprotected portion to separate the unprotected portion from the remainder of the floor assembly. 4. Wood floor assemblies using dimension lumber or structural composite lumber equal to or greater than 2-inch by 10-inch (50.8 mm by 254 mm) nominal dimension, or other approved floor assemblies demonstrating equivalent fire performance. 5. Wood floor assemblies less than 600 square feet (55.7 m2) within detached accessory structures with no habitable space above them. 35 2024 Building Code Modification Index (11/3/2025 V.1) Page 183 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 13 Code Section: 304.1.1 Field treatment Proponent: Structural Engineers Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 22 R317.1.1 IRC 2018 IRC 2018 14 R317.1.1 IRC 2015 IRC 2015 13 R317.1.1 IRC 2012 IRC 2012 12 R317.1.1 Reason: To add the preservative-treated wood product manufacturer’s field treatment recommendations as a method of compliance. Modification: R304.1.1 Field treatment. Field-cut ends, notches and drilled holes of preservative-treated wood shall be treated in the field in accordance with AWPA M4 or in accordance with the preservative-treated wood product manufacturer’s recommendations. 36 2024 Building Code Modification Index (11/3/2025 V.1) Page 184 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 14 Code Section: R305.1 Subterranean termite control methods Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 23 318.1 IRC 2018 IRC 2018 15 318.1 Reason: Provides clarification that additional treatment methods are permissible if it adheres to Section 27-1085 of the Rules and Regulations for the Enforcement of the South Carolina Pesticide Control Act and enforced by the Clemson University Department of Pesticide Regulations. Modification: R305.1 Subterranean termite control methods. In areas subject to damage from termites as indicated by Table R301.2 , protection shall be by one, or a combination, of the following methods: 1. Chemical termiticide treatment in accordance with Section R305.2. 2. Termite-baiting system installed and maintained in accordance with the label. 3. Pressure-preservative-treated wood in accordance with the provisions of Section R304.1. 4. Naturally durable termite-resistant wood. 5. Physical barriers in accordance with Section R305.3 and used in locations as specified in Section R304.1. 6. Cold-formed steel framing in accordance with Sections R505.2.1 and R603.2.1. 7. Treatments may be conducted as outlined in Section 27-1085 of the Rules and Regulations for the Enforcement of the South Carolina Pesticide Control Act and enforced by the Clemson University Department of Pesticide Regulation. 37 2024 Building Code Modification Index (11/3/2025 V.1) Page 185 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 15 Code Section: R305.4 Foam Plastic Protection Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 24 R318.4 IRC 2018 IRC 2018 16 R318.4 Reason: Provided language establishes a best management practice in order to inspect for termites and other wood-destroying organisms. The exception should be deleted due to a lack of rigorous experimental investigation and robust data to indicate a foam insulation product can be treated or produced in a way to make the product 100 % effective against subterranean termite damage or an effective barrier to prevent termites a route into a structure. Modification: R305.4 Foam plastic protection. In areas where the probability of termite infestation is “very heavy” as indicated in Figure R305.4, extruded and expanded polystyrene, polyisocyanurate and other foam plastics shall not be installed on the exterior face or under interior or exterior foundation walls or slab foundations located below grade. The clearance between foam plastics installed above grade and exposed earth shall be not less than 6 inches (152 mm). For crawl space applications, foam plastic shall be installed so as to provide a termite inspection gap of no less than 6 inches (152 mm) along the top of the foundation w all and foundation sill plate. Exceptions: 1. Buildings where the structural members of walls, floors, ceilings and roofs are entirely of noncombustible materials or pressure-preservative-treated wood. 2.Where in addition to the requirements of Section R318.1, an approved method of protecting the foam plastic and structure from subterranean termite damage is used. 3.2. On the interior side of basement walls. 38 2024 Building Code Modification Index (11/3/2025 V.1) Page 186 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 16 Code Section: R305.5 Termite inspection strip Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 25 R318.5 Reason: Provides added consistency and ease for inspections Modification: R305.5 Termite inspection strip. Where foam plastic is applied in accordance with Section R318.4 , a continuous 6 -inch (152 mm) strip centered along the sill plate shall be left open for termite activity inspection. 39 2024 Building Code Modification Index (11/3/2025 V.1) Page 187 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 17 Code Section: R309 Automatic Sprinkler Systems Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 18 R313 IRC 2018 IRC 2018 12 R313 IRC 2015 IRC 2015 12 R313 IRC 2012 IRC 2012 10 R313.1 IRC 2012 IRC 2012 11 R313.2 Reason: Unusually restrictive Modification: SECTION R309 AUTOMATIC FIRE SPRINKLER SYSTEMS R309.1 Townhouse automatic fire sprinkler systems. An automatic residential fire sprinkler system shall not be required to be installed in townhouses when constructed in accordance with Section R302.2. Exception: An automatic residential fire sprinkler system shall not be required where additions or alterations are made to existing townhouses that do not have an automatic residential fire sprinkler system installed. R309.1.1 Design and installation. Automatic residential fire sprinkler systems for townhouses when installed shall be designed and installed in accordance with Section P2904 or NFPA 13D. R309.2 One- and two-family dwellings automatic sprinkler systems. An automatic residential fire sprinkler system shall be installed shall not be required to be installed in one- and two-family dwellings. Exception: An automatic sprinkler system shall not be required for additions or alterations to existing buildings that are not already provided with a sprinkler system. R309.2.1 Design and installation. Automatic residential fire sprinkler systems when installed shall be designed and installed in accordance with Section P2904 or NFPA 13D. 40 2024 Building Code Modification Index (11/3/2025 V.1) Page 188 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 18 Code Section: R316.3 Story above grade plane Proponent(s): Home Builders Association of South Carolina (2021) and Building Officials Association of South Carolina (2024) Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 29 R326.3 Reason: The deletions bring the definition of the habitable attic in line with the 2018 IRC. Modification: R316.3 Story above grade plane. A habitable attic shall be considered a story above grade plane. Exceptions: A habitable attic shall not be considered to be a story above grade plane provided that the habitable attic meets all the following: 1. The aggregate area of the habitable attic is either of the following: 1.1. Not greater than one-third one-half of the floor area of the story below. 1.2. Not greater than one-half of the floor area of the story below where the habitable attic is located within a dwelling unit equipped with an automatic fire sprinkler system in accordance with Section P2904. 2. The occupiable space is enclosed by the roof assembly above, knee walls, if applicable, on the sides and the floor- ceiling assembly below. 3. The floor of the habitable attic does not extend beyond the exterior walls of the story below. 4. Where a habitable attic is located above a third story, an automatic sprinkler system in accordance with Section P2904 shall be installed in the habitable attic and remaining portion of the townhouse unit or dwelling unit or units located beneath the habitable attic. 41 2024 Building Code Modification Index (11/3/2025 V.1) Page 189 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 19 Code Section: R318.3.1 Floor elevations at the required egress doors Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: Replacing “threshold” with “primary floor level” provides clarity for enforcement and design. “Threshold” can vary by product, while “primary floor level” offers a consistent, measurable reference. Modification: R318.3.1 Floor elevations at the required egress doors. Landings or finished floors at the required egress door shall be not more than 1 1/2 inches (38 mm) lower than the top of the threshold primary floor level. Exception: The landing or floor on the exterior side shall be not more than 7 3/4 inches (196 mm) below the top of the threshold provided that the door does not swing over the landing or floor. Where exterior landings or floors serving the required egress door are not at grade, they shall be provided with access to grade by means of a ramp in accordance with Section R318.8 or a stairway in accordance with Section R318.7. 42 2024 Building Code Modification Index (11/3/2025 V.1) Page 190 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 20 Code Section: R318.7.5.1 Risers Proponent: Structural Engineers Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 15 R311.7.5.1 IRC 2018 IRC 2018 09 R311.7.5.1 IRC 2015 IRC 2015 09 R311.7.5.1 IRC 2012 IRC 2012 07 R311.7.5.1 Reason: To establish a maximum height for masonry risers Modification: R318.7.5.1 Risers. The maximum riser height shall be not more than 7 3/4 inches (196 mm). The maximum riser height for masonry stairs shall be 8 inches (203 mm). The riser height shall be measured vertically between leading edges of the adjacent treads. The greatest riser height within any flight of stairs shall not exceed the smallest by more than 3/8 inch (9.5 mm). Risers shall be vertical or sloped from the underside of the nosing of the tread above at an angle not more than 30 degrees (0.51 rad) from the vertical. At open risers, openings located more than 30 inches (762 mm), as measured vertically, to the floor or grade below shall not permit the passage of a 4- inch-diameter (102 mm) sphere. Exceptions: 1. The opening between adjacent treads is not limited on spiral stairways. 2. The riser height of spiral stairways shall be in accordance with Section 318.7.11.1. 3. The opening between adjacent treads is not limited on stairs with a total rise of 30 inches (762 mm) or less. 43 2024 Building Code Modification Index (11/3/2025 V.1) Page 191 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 21 Code Section: R321.1.1 Where required Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 16 R312.1.1 IRC 2018 IRC 2018 10 R312.1.1 IRC 2015 IRC 2015 10 R312.1.1 IRC 2012 IRC 2012 08 R312.1.1 Reason: No technical justification to substantiate a 36-inch measurement away from the leading edge of the walking surface or tread to determine when a guard should be required. Modification: R321.1.1 Where required. Guards shall be provided for those portions of open -sided walking surfaces, including floors, stairs, ramps and landings that are located more than 30 inches (762 mm) measured vertically to the floor or grade below at any point within 36 inches (914 mm) horizontally to the edge of the open side. Insect screening shall not be considered as a guard. Guards shall be located along open -sided walking surfaces of all decks, porches, balconies, floors, stairs, ramps and landings that are located more than 30 inches (762 mm) measured vertically to the floor or grade below; and at any point where a downward slope exceeds 3V:12H within 36 inches (914 mm) horizontally to the edge of the open side. Insect screening shall not be considered as a guard. 44 2024 Building Code Modification Index (11/3/2025 V.1) Page 192 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 22 Code Section: R321.2 Window fall protection Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 17 R312.2 IRC 2018 IRC 2018 11 R312.2 IRC 2015 IRC 2015 11 R312.2 IRC 2012 IRC 2012 09 R312.2 Reason: Unusually restrictive Modification: (Delete without substitution) R321.2 Window fall protection. Window fall protection shall be provided in accordance with Sections R321.2.1 and R321.2.2. R321.2.1 Window opening height. In dwelling units, where the bottom of the clear opening of an operable window opening is located less than 24 inches (610 mm) above the finished floor and greater than 72 inches (1829 mm) above the finished grade or other surface below on the exterior of the building, the operable window shall comply with one of the following: 1. Operable window openings will not allow a 4 -inch-diameter (102 mm) sphere to pass through where the openings are in their largest opened position. 2. Operable windows are provided with window opening control devices or fall prevention devices that comply with ASTM F2090. R321.2.2 Emergency escape and re scue openings. Where an operable window serves as an emergency escape and rescue opening, a window opening control device or fall prevention device, after operation to release the control device or fall prevention device allowing the window to fully open, shall not reduce the net clear opening area of the window unit to less than the area required by Sections R319.2.1 and R319.2.2. 45 2024 Building Code Modification Index (11/3/2025 V.1) Page 193 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 23 Code Section: R325.3 Mechanical ventilation Proponent: Coastal Code Enforcement Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 12 R303.4 IRC 2018 IRC 2018 07 R303.4 IRC 2015 IRC 2015 07 R303.4 IRC 2012 IRC 2012 05 R303.4 Reason: The blower door test is not required with the current State Energy Standard (2009 International Energy Conservation Code) and is not applicable. Modification: (Delete without substitution) R303.4 Mechanical ventilation. Buildings and dwelling units complying with Section 1102.5.1 shall be provided with mechanical ventilation in accordance with Section M1505, or with other approved means of ventilation. 46 2024 Building Code Modification Index (11/3/2025 V.1) Page 194 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 24 Code Section: Figure R327.1 Minimum Fixture Clearances Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 13 R307.1 IRC 2018 IRC 2018 08 R307.1 IRC 2015 IRC 2015 08 R307.1 IRC 2012 IRC 2012 06 R307.2 IRC 2006 IRC 2006 09 R307.2 IRC 2003 IRC 2003 05 R307.2 Reason: No valid reason exists to justify a minimum clearance of 15 inches Modification: Change the minimum dimension for the side clearance between bathtubs and water closets or bidets from 15 inches to 12 inches. 47 2024 Building Code Modification Index (11/3/2025 V.1) Page 195 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 25 Code Section: R404.1.9.2 Masonry piers supporting floor girders Proponent: Home Builders Association of South Carolina and Structural Engineers Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 31 R404.1.9.2 IRC 2018 IRC 2018 20 R404.1.9.2 IRC 2015 IRC 2015 16 R404.1.9.2 IRC 2012 IRC 2012 13 R404.1.9.2 Reason: Unusually restrictive Modification: R404.1.9.2 Masonry piers supporting floor girders. Masonry piers supporting wood girders sized in accordance with Tables R602.7(1) and R602.7(2) shall be permitted in accordance with this section. Piers supporting girders for interior bearing walls shall have a minimum nominal dimension of 12 inches (305 mm) and a maximum height of 10 feet (3048 mm) be filled solidly with grout or type M or S mort ar and shall have a minimum nominal dimension of 8 inches (203 mm) and a maximum height not exceeding 10 times the nominal thickness from top of footing to bottom of sill plate or girder. Piers supporting girders for exterior bearing walls shall have a min imum nominal dimension of 12 inches (305 mm) and a maximum height of 4 feet (1220 mm) from top of footing to bottom of sill plate or girder. Piers supporting beams and girders for exterior bearing walls shall be filled solidly with grout or type M or S mor tar; shall contain a minimum of one #4 (13 mm) dowel mid -depth; and shall have a minimum nominal dimension of 8 inches (203 mm) and a maximum height of 4 times the nominal thickness from top of footing to bottom of sill plate or girder unless it can be sho wn by accepted engineering practice that there is sufficient foundation wall along the foundation line to resist the imposed lateral loads, in which case the maximum height shall not exceed 10 times the nominal thickness. Girders and sill plates shall be anchored to the pier or footing in accordance with Section R403.1.6 or Figure R404.1.5.3. Floor girder bearing shall be in accordance with Section R502.6. 48 2024 Building Code Modification Index (11/3/2025 V.1) Page 196 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 26 Code Section: R408.3 Unvented Crawl Space Proponent: Structural Engineers Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 32 R408.3 IRC 2018 IRC 2018 21 R408.3 Reason: ASTM E1745 is the industry standard for plastic vapor retarders used under concrete slabs or in contact with soil. It is also the main standards for evaluating plastic films that will be used in this application. Three performance classes are outlined A, B and C (with Class A being the strongest). Performance levels are the same for each class, less than 0.1 perms. Tensile strength and puncture resistance change with each class. ASTM E1745 refers to ASTM E154 “Standard Test Methods for Water Vapor Retarders Used in Contact with Earth Under Concrete Slabs, On Walls or as Ground Cover”, which describes test methods for testing the performance of a plastic film after it is subjected to certain elements. These standards outline the methodology whereby plastic vapor retarders are tested. Simply having a low perm rating is not enough when it comes to real-life conditions. Vapor retarders/barriers must also be tough enough to endure the rigors of construction, since this will determine their true long-term ability to protect against water vapor intrusion. Modification: R408.3 Unvented crawl space. For unvented under-floor spaces, the following items shall be provided: 1. Exposed earth shall be covered with a continuous Class I vapor retarder meeting ASTM E1745 Class A. Joints of the vapor retarder shall overlap by 6 inches (152 mm) and shall be sealed or taped. The edges of the vapor retarder shall extend not less than 6 inches (152 mm) up the stem wall and shall be attached and sealed to the stem wall or insulation. 2. One of the following shall be provided for the under-floor space: 2.1. Continuously operated mechanical exhaust ventilation at a rate equal to 1 cubic foot per minute (0.47 L/s) for each 50 square feet (4.7m 2) of crawl space floor area, including an air pathway to the common area (such as a duct or transfer grille), and perimeter walls insulated in accordance with Section N1102.2.11.1. 2.2. Conditioned air supply sized to deliver at a rate equal to 1 cubic foot per minute (0.47 L/s) for each 50 square feet (4.7 m2) of under-floor area, including a return air pathway to the common area (such as a duct or transfer grille), and perimeter walls insulated in accordance with Section N1102.2.11.1. 2.3. Plenum in existing structures complying with Section M1601.5, if under -floor space is used as a plenum. 2.4. Dehumidification sized in accordance with manufacturer's specifications. 49 2024 Building Code Modification Index (11/3/2025 V.1) Page 197 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 27 Code Section: R408.3 Unvented Crawl Space Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 33 R408.3 IRC 2018 IRC 2018 21 R408.3 Reason: Provides added clarity and consistency of codes between regulation and statute. Modification: R408.3 Unvented crawl space. For unvented under-floor spaces, the following items shall be provided: 1. Exposed earth shall be covered with a continuous vapor retarder meeting ASTM E1745 Class A. Joints of the vapor retarder shall overlap by 6 inches (152 mm) and shall be sealed or taped. The edges of the vapor retarder shall extend not less than 6 inches (152 mm) up the stem wall and shall be attached and sealed to the stem wall or insulation. 2. One of the following shall be provided for the under-floor space: 2.1. Continuously operated mechanical exhaust ventilation at a rate equal to 1 cubic foot per minute (0.47 L/s) for each 50 square feet (4.7m2) of crawl space floor area, including an air pathway to the common area (such as a duct or transfer grille), and perimeter walls insulated in accordance with Section N1102.2.11.1 the South Carolina Energy Standard Act. 2.2. Conditioned air supply sized to deliver at a rate equal to 1 cubic foot per minute (0.47 L/s) for each 50 square feet (4.7 m2) of under-floor area, including a return air pathway to the common area (such as a duct or transfer grille), and perimeter walls insulated in accordance with Section N1102.2.11.1 the South Carolina Energy Standard Act. 2.3. Plenum in existing structures complying with Section M1601.5, if under-floor space is used as a plenum. 2.4. Dehumidification sized in accordance with manufacturer's specifications. 50 2024 Building Code Modification Index (11/3/2025 V.1) Page 198 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 28 Code Section: R408.4 Access Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 34 R408.4 IRC 2018 IRC 2018 22 R408.4 IRC 2015 IRC 2015 17 R408.4 Reason: To allow access openings under a doorway Modification: R408.4 Access. Access shall be provided to all under-floor spaces. Access openings through the floor shall be not smaller than 18 inches by 24 inches (457 mm by 610 mm). Openings through a perimeter wall shall be not less than 16 inches by 24 inches (407 mm by 610 mm). W here any portion of the through - wall access is below grade, an areaway not less than 16 inches by 24 inches (407 mm by 610 mm) shall be provided. The bottom of the areaway shall be below the threshold of the access opening. Through wall access openings shall not be located under a door to the residence. See Section M1305.1.3 for access requirements where mechanical equipment is located under floors. 51 2024 Building Code Modification Index (11/3/2025 V.1) Page 199 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 29 Code Section: R408.8 Under floor vapor retarder Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 35 R408.4 Reason: Application is not practical. Modification: (Section deleted without substitution) R408.8 Under -floor vapor retarder. In Climate Zones 1A, 2A and 3A below the warm -humid line, a continuous Class I or II vapor retarder shall be provided on the exposed face of air-permeable insulation installed between the floor joists and exposed to the grade in the under -floor space. The vapor retarder shall have a maximum water vapor permeance of 1.5 perms when tested in accordance with Procedure B of ASTM E96. Exception: The vapor retarder shall not be required in unvented crawl spaces constructed in accordance with Section R408.3. 52 2024 Building Code Modification Index (11/3/2025 V.1) Page 200 of 332 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 30 Code Section: R502.12.4 Truss design drawings Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 36 R502.11.4 IRC 2018 IRC 2018 23 R502.11.4 IRC 2015 IRC 2015 18 R502.11.4 IRC 2012 IRC 2012 14 R502.11.4 IRC 2006 IRC 2006 21 R502.11.4 IRC 2003 IRC 2003 17 R502.11.4 Reason: The section was modified to allow the approval of truss design drawings by local building officials to occur at the time of the framing inspection, rather than at an undefined time prior to installation. Modification: R502.12.4 Truss design drawings. Truss design drawings , prepared in compliance with Section R502.12.1, shall be submitted to the building official and approved prior to installation at the time of their inspection. Truss design drawings shall be provided with the shipment of trusses delivered to the job site. Truss design drawings shall include, at a minimum, the information specified as follows: (No changes to items 1-12) 53 2024 Building Code Modification Index (11/3/2025 V.1) Page

Text truncated. Open the original for the full document.

Source: Beaufort County website. First collected Oct 24, 2026.