County Council Meeting — Agenda Packet
Beaufort County · Beaufort County · County Council Meeting · meeting of Oct 12, 2026 · Agenda packets
Open the original document More from Beaufort County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
County Council Meeting
Beaufort County, SC
Council Chambers, Administration Building
Beaufort County Government Robert Smalls Complex
100 Ribaut Road, Beaufort
Monday, October 12, 2026
6:00 PM
AGENDA
COUNCIL MEMBERS:
Alice Howard, Chair
David P. Bartholomew
Logan Cunningham
York Glover
Lawrence McElynn
Thomas Reitz
Anna Maria Tabernik, Vice-Chair
Paula Brown
Gerald Dawson
Mark Lawson
Joseph Passiment
1. CALL TO ORDER: Alice Howard, Chair
2. PLEDGE OF ALLEGIANCE AND INVOCATION: Gerald Dawson, Council Member
3. STATEMENT OF COMPLIANCE WITH FOIA: Alice Howard, Chair
4. APPROVAL OF AGENDA
5. APPROVAL OF MINUTES
a. Minutes from Caucus and County Council September 14, 2026.
6. PROCLAMATION
a. Proclamation recognizing the Week of October 18–24 as National Friends of Libraries Week.
b. Proclamation recognizing Kraig Gordon.
7. ADMINISTRATOR'S REPORT
8. PUBLIC COMMENT PERIOD - 30 MINUTES TOTAL
9. LIAISON AND COMMITTEE REPORTS
● Community Services Committee
● Natural Resources Committee
● Finance, Administration, and Economic Development Committee
● Public Facilities Committee
Page 1 of 332
10. APPROVAL OF CONSENT AGENDA
CONSENT AGENDA
a. Items Originating from the Public Facilities and Safety Committee
1. Approval of task order to Collins Engineers, Inc for the design of improvements and
expansion of the Eddings Point Boat Landing ($233,912.80) (Pending A&H Tax awards on
9/14/26)
2. Approval of a change order to MAJ Enterprises, Inc. for the Shell Point Traffic Calming Project
($53,592.09)
3. Recommendation to Award a contract to Apac Atlantic, Inc for the Sunset Blvd / Miller Drive
roadway resurfacing and traffic calming project ($739,873.48)
4. Approval of a Task Order to HDR Engineering, Inc for the Preliminary Engineering for
Alterations to the Chowan Creek Bridge Approaches ($212,630)
5. Omnia contract award for St. Helena Island Library LED retrofit ($200,000).
6. Recommendation for approval of a change order with Kimley Horn for a Phase 2
Environmental Site Assessment (ESA) on the Ladys Island Drive Turn Lane at Ribaut Road
Project ($42,350)
END OF CONSENT AGENDA
11. ORDINANCES FOR THIRD READING:
a. 2026/43: An ordinance to amend Ordinance 2026/29 to authorize the transfer of funds.
The vote at the Finance, Administration, and Economic Development Committee on August 17,
2026 - 9:0
The vote at First Reading on September 14, 2026 - 9:1
The vote at Second Reading and Public Hearing September 28, 2026 - 6:4
b. 2026/44: An Ordinance Amending the FY2027 Budget for Stormwater Utility Operations, Carryover
Purchase Orders, Accommodations & Hospitality Tax projects, and Facility Operations.
The vote at Finance, Administration, and Economic Development Committee Meeting on August
17, 2026 - 9:0
The vote at First Reading on September 14, 2026 - 10:0
The vote at Second Reading and Public Hearing on September 28, 2026 - 10:0
c. 2026/45: An Ordinance Authorizing the County Administrator to Execute the Necessary Documents
and Provide Funding for the Purchase of Real Property Identified as TMS Nos. R200-010-000-
0340-0000, R200-010-000-021G-0000, and R200-010-000-0446-0000 from Brickyard Commons,
LLC for the Royal Pines Stormwater Project in the amount of $3,475,000.
The vote at the Finance, Administration, and Economic Development Committee meeting on
August 17, 2026 - 9:0
The vote at First Reading on September 14, 2026 - 10:0
The vote at Second Reading and Public Hearing on September 28, 2026 - 10:0
d. 2026/46: An Ordinance Authorizing the County Administrator or negotiating authority in accordance
with Resolutions 2019/44 and 2021/20 to execute any and all necessary documents for the
acceptance of Right of Way and/or Temporary Construction Easement properties as shown on
EXHIBIT A Pages 1-4 associated with the Sidewalks and Multi-use Pathways – Safe Routes to
Page 2 of 332
Schools and EXHIBIT A Pages 5-8 associated with the Lady’s Island Corridor Traffic
Improvements.
The vote at the Public Facilities Committee Meeting on August 17, 2026 - 9:0
The vote at First Reading on September 14, 2026 - 10:0
The vote at Second Reading and Public Hearing on September 28, 2026 - 10:0
12. ORDINANCES FOR SECOND READING:
a. 2026/47: An Ordinance authorizing the County Administrator to execute an Electric Line Easement
with Dominion Energy on the property known as Pocotaligo Preserve (TMS R710 012 000 0001
0000 and R710 012 000 0072 0000).
The vote at Natural Resources Committee on September 8, 2026 - 7:0
The vote at First Reading on September 28, 2026 - 10:0
b. 2026/48: An Ordinance amending the Beaufort County Code of Ordinances, Chapter74 - Building
and Building Regulations, Section 74-64, Adoption of Building Codes (Amends Code of Ordinances
to adopt the 2024 State Mandated Code Editions).
The vote at Natural Resources Committee on September 8, 2026 - 7:0
The vote at First Reading on September 28, 2026 - 10:0
13. ORDINANCES FOR FIRST READING:
a. 2026/49: An Ordinance authorizing the private road acceptance of Bellinger Bluff Road and
Bellinger Neck Road into the County Road Inventory.
The vote at Public Facilities Committee on September 21, 2026 - Failed 3:7
b. 2026/50: An Ordinance to amend Beaufort County's Budget Ordinance for Fiscal Year 2027
(Ordinance No. 2026/29) to amend Section III, County Operations Revenues, and Section IV,
County Operations Appropriations to appropriate Fund Balance for Beaufort County Regions
Tournament Complex.
The vote at Finance, Administration, and Economic Development Committee on September 21,
2026 - Failed 5:5
14. ADJOURNMENT
To watch committee or County Council meetings or for a complete list of agendas and backup packages,
please visit: https://beaufortcountysc.gov/council/council-committee-meetings/index.html
Page 3 of 332
Caucus Meeting
Beaufort County, SC
Council Chambers, Administration Building
Beaufort County Government Robert Smalls Complex
100 Ribaut Road, Beaufort
Monday, September 14, 2026
4:00 PM
MINUTES
Watch the video stream available on the County's website to hear the Council’s discussion of a specific topic or the
complete meeting https://beaufortcountysc.new.swagit.com/videos/400863
1. Call to Order
Chair Howard called the meeting to order at 4:00 PM
Present
Chair Alice Howard
Vice-Chair Anna Maria Tabernik
Council Member David Bartholomew
Council Member Paula Brown
Council Member Logan Cunningham
Council Member Gerald Dawson
Council Member Mark Lawson
Council Member Lawrence McElynn
Council Member Joseph Passiment
Council Member Thomas Reitz
Absent
Council Member York Glover
2. Pledge of Allegiance
Chair Howard led the Pledge of Allegiance.
3. Statement of Compliance with FOIA
Chair Howard stated that public notification of this meeting had been published, posted, and distributed
in compliance with SC FOIA.
4. Approval of Agenda
Motion: It was moved by Council Member Cunningham, seconded by Vice-Chair Tabernik to approve
the agenda.
Motion to Amend: It was moved by Council Member McElynn, seconded by Council Member
Bartholomew to amend the agenda to add item for consideration of structural, ethical, and organizational
reasons for discussions regarding the creation of County Ordinance change in the reporting requirement
Page 4 of 332
of the County Attorney from the County Administrator to County Council.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member McElynn,
Council Member Passiment, and Council Member Reitz. The motion to amend passed 9:0.
Main Motion: It was moved by Council Member Cunningham, seconded by Vice-Chair Tabernik to
approve the agenda as amended.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member McElynn,
Council Member Passiment, and Council Member Reitz. The amended motion passed 9:0.
5. Executive Session
Motion: It was moved by Council Member Cunningham, seconded by Vice-Chair Tabernik to go into
Executive Session.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member McElynn,
Council Member Passiment, and Council Member Reitz. The motion passed 9:0.
a. Under S.C. Code of Laws section 30-4-70(a)(1) discussion of personnel matters relating to an
inquiry being conducted pursuant to S.C Code Section 4-9-660 (Quick Group)
b. Under S.C. Code section 30-4-70(a)(2) legal advice related to discussion of negotiations incident
to pending litigation or other matters covered by the attorney client privilege (Pine Island Property
Holdings, LLC and Pine Island GC, LLC v. Beaufort County).
c. Under S.C. Code section 30-4-70(a)(2) Discussion of negotiations incident to proposed contractual
arrangements and legal advice related to pending, threatened, or potential claim or matters
covered by the attorney client privilege (Charleton Mews Storm Drainage Issue on Bluffton
Parkway).
d. Under S.C. Code section 30-4-70(a)(2) legal advice related to discussion of negotiations incident
to pending litigation or other matters covered by the attorney client privilege (Beaufort County v.
Nova Industrial Properties, LLC - Condemnation case).
e. Discussion of the Legal Department reporting to County Council instead of the County Attorney.
6. Matters Arising out of Executive Session
Motion: It was moved by Chair Howard, seconded by Vice-Chair Tabernik that Council accept the
proposed settlement offer from Nova Industrial Properties, LLC and that we authorize the County
Administrator to execute the proposed settlement agreement.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Brown, Council Member
Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council
Member Passiment, and Council Member Reitz. The motion passed 9:0.
7. Adjournment
Motion: It was moved by Council Member Passiment, seconded by Council Member Dawson to adjourn
the meeting.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Brown, Council Member
Page 5 of 332
Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council
Member Passiment, and Council Member Reitz. The motion passed 9:0.
COUNTY COUNCIL OF BEAUFORT COUNTY
BY: _________________________________________
Alice G. Howard, Chairman
ATTEST:
______________________________________
Sarah W. Brock, Clerk to Council
Ratified:
Page 6 of 332
County Council Meeting
Beaufort County, SC
Council Chambers, Administration Building
Beaufort County Government Robert Smalls Complex
100 Ribaut Road, Beaufort
Monday, September 14, 2026
6:00 PM
MINUTES
Watch the video stream available on the County's website to hear the Council’s discussion of a specific topic or
the complete meeting https://beaufortcountysc.new.swagit.com/videos/400866
1. Call to Order
Chair Howard called the meeting to order at 6:05 PM
Present
Chair Alice Howard
Vice-Chair Anna Maria Tabernik
Council Member David Bartholomew
Council Member Paula Brown
Council Member Logan Cunningham
Council Member Gerald Dawson
Council Member Mark Lawson
Council Member Lawrence McElynn
Council Member Joseph Passiment
Council Member Thomas Reitz
Absent
Council Member York Glover
2. Pledge of Allegiance and Invocation
Council Member Lawson led the Pledge of Allegiance and gave the invocation.
3. Statement of Compliance with FOIA
Chair Howard stated that public notification of this meeting had been published, posted, and distributed
in compliance with SC FOIA.
4. Approval of Agenda
Motion: It was moved by Vice-Chair Tabernik, seconded by Council Member Lawson to approve the
agenda.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
Page 7 of 332
5. Approval of Minutes
Motion: It was moved by Vice-Chair Tabernik, seconded by Council Member Lawson to approve the
minutes from Caucus and County Council August 10, 2026.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
6. Proclamation
a. Proclamation recognizing Fire Safe South Carolina Community Designations
Vice-Chair Tabernik presented a proclamation to the Fire Districts of Beaufort County recognizing
them for receiving the Fire Safe South Carolina Community Designations.
b. Proclamation recognizing the week of September 17 through 23 as Constitution Week.
Council Member Passiment presented a proclamation to Missy Thorpe recognizing the week of
September 17 through 23 as Constitution Week.
c. Proclamation recognizing September 2026 as National Recovery Month
Council Member McElynn presented representatives from Nexus a proclamation recognizing
September 2026 as National Recovery Week.
7. Administrator’s Report
Michael Moore, County Administrator, presented recognition to county employees for years of
longevity and retirement, introduced the new Detention Center Director, and recognized the First
Responder of the Year. Mr. Moore provided updates on the Sales Tax Referendum, the 278 Bridge
project, the Alljoy Pathway Project, and the new Fire Station 39. Please watch the video stream on the
county's website to view the full report. https://beaufortcountysc.new.swagit.com/videos/400866
8. Public Comment Period
Public comments were taken. Please watch the video stream on the county's website to view the full
comment period. https://beaufortcountysc.new.swagit.com/videos/400866
9. Liaison and Committee Reports
Council members gave updates on the boards and commissions. Please watch the video stream on
the county's website to view the full
report. https://beaufortcountysc.new.swagit.com/videos/400866
10. Approval of Consent Agenda
Motion: It was moved by Council Member Cunningham, seconded by Council Member Passiment to
approve the consent agenda.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
CONSENT AGENDA
a. Items Originating from the Public Facilities and Safety Committee
Page 8 of 332
1. Approval of Contract to Cape Romain Contractors, Inc for the demolition and removal of the
Wimbee Creek Fishing Pier ($563,282.50)
2. Approval of a contract for Admin Building Mechanical System Replacement via OMNIA Purchasing
Cooperative ($1,084,904)
3. Approval of Talbert, Bright & Ellington Work Authorization 2119-2410 Amendment 1 for Financial
Planning, Passenger Facility Charge (PFC) Application Coordination, and Airline Rates and
Charges Support Services ($204,128.97)
4. Approval of a contract to Edison Foard for the design-build of an Eight-Bay T-Hangar and 50' x 50'
Box Hangar at Beaufort Executive Airport (ARW) ($2,107,000)
5. Approval of Contract to Esposito Construction for the Design/Build project for Fort Fremont Stairs
& Rails Construction ($617,288.95)
END OF CONSENT AGENDA
11. Agenda Items
a. Appointment of John Meers to the Airports Board for a two-year term with the expiration date of
July 2028.
Motion: It was moved by Council Member Passiment, seconded by Council Member Cunningham to
approve the appointment of John Meers to the Airports Board for a two-year term with the expiration
date of July 2028.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
b. Discussion of Transfer and Acceptance of Intergovernmental Support Agreement (IGSA) Between
Marine Corps Air Station Beaufort, Beaufort County School District, and Beaufort County
Motion: It was moved by Council Member Passiment, seconded by Vice-Chair Tabernik to put the item
on the floor for discussion.
Council directed Administration and Staff to go forward with the transfer and acceptance of the IGSA.
Please watch the video stream on the county's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/400866
c. Approval of an assignment of contract to Tri Point Homes from Village Park Communities in a
existing three-way agreement with Beaufort County, Town of Bluffton and Village Park
Communities Agreement for Engineering Services Holly Hill Road.
Motion: It was moved by Vice-Chair Tabernik, seconded by Council Member Passiment to approve of
an assignment of contract to Tri Point Homes from Village Park Communities in a existing three way
agreement with Beaufort County, Town of Bluffton and Village Park Communities Agreement for
Engineering Services Holly Hill Road.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
d. Business License Appeal: Geismar North America
Page 9 of 332
Motion: It was moved by Council Member Passiment, seconded by Council Member Dawson to put the
item on the floor for discussion.
Motion: It was moved by Council Member Dawson, seconded by Council Member McElynn to have the
County Attorney negotiate a settlement between Geismar North America and the business license
department.
The Vote - Voting Yea: Chair Howard, Council Member Brown, Council Member Dawson, Council
Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz.
Voting Nay: Vice-Chair Tabernik and Council Member Cunningham.
Abstaining: Council Member Bartholomew. The motion passed 7:2:1
12. Ordinances for Second Reading
a. 2026/41: An Ordinance amending the Community Development Code (CDC): section 5.3.20
(applicability), 4.2.20 (standards for free-standing accessory buildings/structures), 5.8.100
(screening), and 10.1.190 (definitions) (PUBLIC HEARING)
Motion: It was moved by Council Member Passiment, seconded by Council Member Dawson to
approve Second Reading and Public Hearing of Beaufort County Ordinance 2026/41 for the following
reasons: it is consistent with the goals, objectives, and policies of the comprehensive plan; it is not in
conflict with any provision of this development code or the code of ordinances; it is not required by
changed conditions; it does address a demonstrated community need; it is consistent with the purpose
and intent of the zones in this development code, or would improve compatibility among uses and
ensure efficient development within the county; it would result in a logical and orderly development
pattern; and it would not result in adverse impacts in the natural environment including but not limited to
water, air, noise, stormwater management, wildlife, vegetation, wetlands, and the natural functioning of
the environment.
Vice-Chair Tabernik opened the floor for public comment.
No one came forward.
Vice-Chair Tabernik closed the floor for public comment.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
b. 2026/42: An Ordinance amending the zoning map for 1.4 acres (R300 012 000 0129 0000, R300
012 000 047A 0000) from T2R to T2RC. (PUBLIC HEARING)
Motion: It was moved by Council Member Passiment, seconded by Chair Howard to approve Second
Reading and Public Hearing of Beaufort County Ordinance 2026/42 for the following reasons: it is
consistent with the goals and policies of the comprehensive code and the purposes of the development
code; it is not in conflict with provisions of the development code and our code of ordinances; it is not
required by changed conditions; it is compatible with existing and proposed use of land surrounding this
land; it would not adversely affect nearby land; it would result in logical and orderly development
patterns; it would not result in adverse impact on the natural environment (water, air, noise, stormwater
management, wildlife, vegetation, wetlands, and the natural functioning of the environment); and it
would result in development that is adequately served by public facilities (streets; potable water, sewer,
stormwater management, solid waste collection and disposal, schools, parks, police, fire, emergency
medical facilities).
Page 10 of 332
Vice-Chair Tabernik opened the floor for public comment.
No one came forward.
Vice-Chair Tabernik closed the floor for public comment.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council
Member Passiment, and Council Member Reitz.
Voting Nay: Council Member Cunningham. The motion passed 9:1.
13. Ordinances for First Reading
a. 2026/43: An ordinance to amend Ordinance 2026/29 to authorize the transfer of funds.
Motion: It was moved by Council Member Passiment, seconded by Council Member Lawson to approve
the First Reading of Beaufort County Ordinance 2026/43.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Brown, Council Member
Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council
Member Passiment, and Council Member Reitz.
Voting Nay: Council Member Bartholomew. The motion passed 9:1.
b. 2026/44: An Ordinance Amending the FY2027 Budget for Stormwater Utility Operations, Carryover
Purchase Orders, Accommodations & Hospitality Tax projects, and Facility Operations.
Motion: It was moved by Chair Howard, seconded by Council Member Passiment to approve First
Reading of Beaufort County Ordinance 2026/44.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
c. 2026/45: An Ordinance Authorizing the County Administrator to Execute the Necessary
Documents and Provide Funding for the Purchase of Real Property Identified as TMS Nos. R200-
010-000-0340-0000, R200-010-000-021G-0000, and R200-010-000-0446-0000 from Brickyard
Commons, LLC for the Royal Pines Stormwater Project in the amount of $3,475,000.
Motion: It was moved by Council Member Bartholomew, seconded by Chair Howard to approve First
Reading of Beaufort County Ordinance 2026/45.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
d. 2026/46: An Ordinance Authorizing the County Administrator or negotiating authority in
accordance with Resolutions 2019/44 and 2021/20 to execute any and all necessary documents
for the acceptance of Right of Way and/or Temporary Construction Easement properties as shown
on EXHIBIT A Pages 1-4 associated with the Sidewalks and Multi-use Pathways – Safe Routes to
Schools and EXHIBIT A Pages 5-8 associated with the Lady’s Island Corridor Traffic
Improvements.
Page 11 of 332
Motion: It was moved by Council Member Dawson, seconded by Council Member Bartholomew to
approve First Reading of Beaufort County Ordinance 2026/46.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
14. Resolutions
a. 2026/36: Resolution to Award FY26 Local 3% Accommodations Tax Grants
Motion: It was moved by Vice-Chair Tabernik, seconded by Council Member Cunningham to approve
Beaufort County Resolution 2026/36.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
b. 2026/37: Resolution to Award FY26 Local 2% Hospitality Tax Grants.
Motion: It was moved by Vice-Chair Tabernik, seconded by Council Member Cunningham to approve
Beaufort County Resolution 2026/37.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
c. 2026/38: Resolution to establish and authorize the implementation of a Retiree Health
Reimbursement Arrangement for eligible Beaufort County retirees.
Motion: It was moved by Council Member Bartholomew, seconded by Council Member McElynn to
approve Beaufort County Resolution 2026/38.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
d. 2026/39: Resolution Authorizing the County Administrator to Pursue Condemnation for Portions of
Parcels as Specified on Exhibit "A" Associated with Right-of-Way Acquisition for a Sidewalk
Located on Big Estate Road as Part of the 2018 One Cent Referendum.
Motion: It was moved by Council Member Dawson, seconded by Council Member Cunningham to
approve Beaufort County Resolution 2026/39.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
e. 2026/40: Resolution to Adopt of the 2026 Lowcountry Hazard Mitigation Plan.
Motion: It was moved by Council Member Passiment, seconded by Council Member Cunningham to
approve Beaufort County Resolution 2026/40.
Page 12 of 332
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
f. 2026/41: Resolution to accept a Federal Aviation Administration (FAA) Airport Improvement
Program (AIP) grant in the amount of $1,819,044 to reimburse Beaufort County for the purchase of
26 Hunter Road, contingent upon receipt of the final FAA grant offer.
Motion: It was moved by Council Member Reitz, seconded by Council Member Bartholomew to approve
Beaufort County Resolution 2026/41.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
g. 2026/42: Resolution to accept a Federal Aviation Administration (FAA) Airport Infrastructure Grant
(AIG) in the amount of $1,358,322 to reimburse Beaufort County for the purchase of 28 Hunter
Road, contingent upon receipt of the final FAA grant offer.
Motion: It was moved by Council Member Reitz, seconded by Council Member Bartholomew to approve
Beaufort County Resolution 2026/42.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
15. Adjournment
Motion: It was moved by Council Member McElynn, seconded by Council Member Bartholomew to go
back into Executive Session.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Lawson,
Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed
10:0.
There were no matters coming out of Executive Session.
COUNTY COUNCIL OF BEAUFORT COUNTY
BY: _________________________________________
Alice G. Howard, Chairman
ATTEST:
______________________________________
Sarah W. Brock, Clerk to Council
Ratified:
Page 13 of 332
Whereas, libraries are essential to the educational, social, and cultural fabric
of our communities, providing access to knowledge, information, and resources that
empower people of all ages and backgrounds; and
Whereas, the Friends of the Beaufort Library, Friends of the Bluffton
Library, and Friends of the Hilton Head Island Library support fundraising
efforts that provide additional programs, special projects, collections, and
enhancements that enrich the library experience for residents throughout
Beaufort County; and
Whereas, the Friends support programs such as Summer Reading and
Winter Reading, advocate for well-funded libraries, and help ensure access to
materials, services, and opportunities that promote literacy and lifelong learning;
and
Whereas, through their generosity, volunteer service, and commitment to
the Beaufort County Library, the Friends demonstrate the positive impact of
civic engagement and volunteerism in strengthening our communities;
Now,
therefore
be
it
resolved, that Beaufort County Council does hereby
proclaims
“October 18th-24th National Friends of Libraries
Week”
and encourages residents to join and support a local Friends of the Library group in
recognition of their continued dedication and service to our Beaufort County
libraries and communities.
Dated this 12th day of October 2026.
___________________________________
Alice Howard, Chair
Beaufort County Council
~
Proclamation
~
Page 14 of 332
Whereas, the Beaufort County Transportation Committee plays an important
role in planning for transportation needs and investing in roads, infrastructure, and
transportation improvements throughout Beaufort County; and
Whereas, Kraig Gordon has dedicated eleven years of service to the
Beaufort County Transportation Committee, including serving as Chairman and
providing leadership, guidance, and commitment to the Committee’s work; and
Whereas, Mr. Gordon’s background in civil engineering, public works,
and the construction of bridges and highways has provided valuable experience
and knowledge in support of Beaufort County’s transportation needs; and
Whereas, throughout his tenure, Mr. Gordon worked with Committee
members, County staff, municipalities, and the South Carolina Department of
Transportation to support transportation projects and investments benefiting
Beaufort County.
Now,
therefore
be
it
resolved, that Beaufort County Council does
hereby recognizes and honors Kraig Gordon for eleven years of dedicated service
and leadership as Chairman of the Beaufort County Transportation Committee, and
expresses its sincere appreciation for his contributions to Beaufort County and its
citizens.
Dated this 12th day of October 2026.
___________________________________
Alice Howard, Chair
Beaufort County Council
~
Proclamation
~
Page 15 of 332
Page 16 of 332
J#2 REQUEST FOR PUBLIC COMMENTS
Beaufort County, SC Council
Date: / 6 / L J__ J JJ.,,,
Name-Print: CJ)..rrrf:...<2 • M
6_J
o r
District: ;:;_ • , • /uq_
Topic: SJ- I
1
� �J ' CFo
Email Address: (if you would like someone to reach out to you)
�Vlvrl e/1 s1-c. h ji./\__ l � 4 'Moo ., co tr\
PUBLIC COMMENTS
Beaufort County, SC Council
Date: (0/ / 2_/ 2�
Name-Print: Jo� fl Dv n f\
District: Blc:.J �t+ao
Topic: f"fo ck C "'wi-er0'.\5
Email Address: (if you would like someone to reach out to you)
,�john p�un11 3@jMC1�1 <t◊r"i
Signature: � P [}./VY{\t
Page 17 of 332
v#4 REQUEST FOR PUBLIC COMMENTS
Beaufort County, SC Council
Date: /0 / J h r -1 - -l Name-Print: /:-.1 {\ J IQ�-?20
District: ?f-_ T {OkVllvf
Topic: Ett1/C>
Email Address: (if you would like someone to reach out to you)
Signature: ____________________ _
'/J#5 REQUEST FOR PUBLIC COMMENTS
Beaufort County, SC Council
Date: I t?J I / a. I
Name-Print: &« rr '1 1h ,' 1:--,llt-1 dcv,
District: /111ql£,li"1 C[ 11 .,_ , 7
Topic: /., (i, 5}_ liJ EJ ·
Email Address: (if you would like someone to reach out to you)
Page 18 of 332
Page 19 of 332
Page 20 of 332
If you believe that you have participated in what is described above and you have any questions
regarding current litigation cases, please contact our County Attorney, Brian Hulbert. Every council
member needs to carefully consider whether they should initiate or participate in any of the meetings
or discussions listed above.
Copy to:
Michael Moore, County Administrator
Brian Hulbert, County Attorney
Sincerely,
�lbwd
Alice Howard, Chairman
Beaufort County Council
Page 21 of 332
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
APPROVAL OF TASK ORDER TO COLLINS ENGINEERS, INC FOR THE DESIGN OF IMPROVEMENTS AND
EXPANSION OF THE EDDINGS POINT BOAT LANDING ($233,912.80) (PENDING A&H TAX AWARDS ON 9/14/26)
MEETING NAME AND DATE:
County Council October 12, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of task order to Collins Engineers, Inc. for the design and permitting of
improvement and expansion of the Edding's Point Boat Landing in the amount of $233,912.80.
PRESENTER INFORMATION:
Bryan Bauer, PE - Director of Engineering (5 min)
ITEM BACKGROUND:
The Edding's Point Boat Landing was identified in the Beaufort County Public Boat Landing Facilities Study as a
high-priority for future expansion. It is one of the busier boat landings in the County and lacks adequate
parking and amenities. The project was selected for FY 2026 ATAX funding.
Collins Engineers, Inc was one of three consultants selected in the competitively bid RFQ # 040726 On-Call
Marine and Coastal Engineering Services
FISCAL IMPACT:
The fee for Collins Engineers, Inc. for the design and permitting of improvement and expansion of the Edding's
Point Boat Landing is $212,647.80. Staff recommends a 10% contingency of approximately $21,265 for a total
of $233,912.80. Funding for this project is from A & H tax with account number 2001-10-0000-57130-EDPT
with a balance to be updated after Council meeting on 9/14/26.
APPROVAL HISTORY:
The project was approved for award of FY 2026 ATAX funding at the August 17, 2026 Finance meeting and
then at County Council on September 14, 2026.
Page 22 of 332
Brian Bauer, PE, ENV SP August 27, 2026
Beaufort County
Director of Engineering
104 Industrial Village Road
Building 3
Beaufort, SC 29906
843-255-2706
RE: Eddings Point Boat Landing Improvement Proposal
Dear Mr. Bauer:
Collins Engineers, Inc. (Collins) is pleased to sub mit this cost proposal to Beaufort County (County) to
provide civil engineering services in support of im provements to the Eddings Point Boat Landing site
located at 511 Eddings Point Road in Beaufort County, South Carolina. The scope of services for this project
shall be subject to the terms and conditions of the On Call Marine and Coastal Engineering Services
contract dated June 10, 2026.
Collins understands that the County has identified Eddings Point Boat Landing for enhancement and
improvements to better serve the residents of Beauf ort County under the 2023 Public Boat Landing
Facilities Study. Key elements of improvements on t his project include the expansion of parking,
improvement of the parking and drive surfaces, crea tion of a walking trail, launch ramp improvements,
shoreline stabilization, consideration for an addit ional fishing pier, dock improvements and direction al
signage. Efforts will be made to incorporate resili ent practices where permissible, such as living/hyb rid
shorelines, stormwater treatment systems, corrosion resistant material selections, staging areas for
emergency response and sea-level rise considerations.
Scope of Work
Following is a summary of the scope of services that Collins anticipates performing:
I. Meetings
A. Project Kickoff Meeting: Collins proposes to meet with Beaufort County stakeholders to kickoff
the design efforts. It is anticipated that the kick off meeting will las no more than 2 hours in
duration. The kickoff meeting will include a discussion regarding permitting and include Beaufort
County permitting and Resource Land Consultants (RLC).
B. Design Submittal Review Meetings : At the conclusion of each design stage, Collins will conduct
a design review meeting to review consolidated comments from Beaufort County stakeholders.
It is assumed Collins will have consolidated comments prior to the review meeting and will come
prepared to discuss any comments requiring greater discussion. It is assumed that each design
review meeting will be 2 hours in duration.
Page 23 of 332
C. Monthly Coordination Calls: Collins will attend monthly meetings with the Beau fort County
Project Manager to discuss the project. Calls are anticipated to average 30 minutes in duration.
Issue tracking and risk register review shall be di scussed during these meetings; Collins will
maintain a list of ongoing issues along with resolutions when developed.
II. 30% Design (Schematic Design)
A. Basis of Design Memorandum: This document will outline the design criteria, assumptions, and
methodologies used in the schematic design phase. It will include:
• Project objectives and scope
• Design assumptions and criteria
• Preliminary design calculations
• List of anticipated drawings and specifications
B. Survey and Geotechnical Investigation: Complete a topographical and site survey of the fu ll
parcel(s), including Jenkins Creek adjacent to the site. A geotechnical investigation will also be
conducted to provide pavement recommendations and evaluate permeability of the site.
C. Schematic Drawings: These drawings will provide a preliminary layout o f proposed
modifications, including:
• General layout of parking and traffic flow
• Proposed drainage scheme
• Critical area impacts
D. Anticipated Drawings and Specifications: A comprehensive list of all drawings and specifications
expected to be developed during the detailed design phase.
E. Cost Estimate: Collins will develop a Class IV estimate as defined by AACE.
F. Schedule: Collins will provide a schedule of design, permitt ing and construction activities
anticipated for the project.
III. 60% Design (Detailed Design)
A. Plans and Specifications: The detailed design phase will produce plans and s pecifications that
are complete to an overall average of 60%, including:
• Detailed layout of parking, staging, traffic and surface improvements
• Storm structure locations and details
• Defined critical area impacts and mitigation plan
• Utility routing
• Final grading
B. Design Review and Coordination: Coordination with Beaufort County and other stakeholders to
review the 60% design documents and incorporate feedback.
Page 24 of 332
C. Cost Estimate: Collins will provide a class II estimate as define d by AACE. The design will be
considered frozen at the conclusion of the 60% design review process. Any changes made after
this may have a significant impact on project schedule and cost.
D. Schedule: Collins will provide an updated schedule at this design submission.
IV. 90% Design (Final Design)
A. Final Plans and Specifications: The final design phase will produce plans and specifications that
are 90% complete and ready for Beaufort County review, including:
• Complete set of construction drawings
• Finalized details
• Draft front-end documents
• Liquidated damages and schedule recommendations
• SWPPP
B. Quality Control and Assurance: Conduct thorough quality control and assurance rev iews to
ensure the design meets all project requirements and standards.
C. Final Design Review: Facilitate a final design review meeting with Beau fort County to address
and remaining comments and finalize the design documents.
D. Cost Estimate: Collins will develop a Class I estimate as defined by AACE. It is anticipated this
cost estimate will be updated during the bid phase of the project.
E. Schedule: Collins will provide an updated schedule at this design submission.
V. 100% Design (Issued for Bid Documents)
A. Sealed Drawing and Specification Set: Collins will provide a sealed set of construction drawings
and specifications for bidding purposes.
B. O & M Manual: Collins will prepare a short and concise O&M Manua l for the County outlining
any requirements listed on construction plans for required maintenance of proposed facilities.
C. Bid Support: Collins will prepare materials for and attend a pr e-bid meeting and support
Beaufort County during the bid process by respondin g to bidder inquiries and issuing any
necessary addenda. Collins will also review the bids for responsiveness and responsibleness and
issue a path forward recommendation letter to Beauf ort County for use in considering and
awarding bids.
D. Cost Estimate: Collins will update the previous Class I estimate during the bid phase.
VI. Permitting
Collins will engage Resource Land Consultants as a subconsultant to manage and execute the permitting
efforts required for the Eddings Point Boat Landing project. The scope of services for permitting will
include the following tasks:
Page 25 of 332
A. Permitting Strategy Development:
a. Initial Assessment: Conduct an initial assessment to identify all nece ssary permits and
regulatory requirements
b. Permitting Plan: Develop a comprehensive permitting plan outlining the steps, timelines,
and responsibilities for obtaining the required permits.
B. Regulatory Coordination:
a. Agency Consultation: Engage in early consultation with relevant regulat ory agencies,
including the U.S. Army Corps of Engineers (USACE), U.S. Coast Guard (USCG), South
Carolina Department of Environmental Services (DES), Coastal Zone Consistency Division
(CZC) Bureau of Coastal Management, and other stakeholders.
b. Pre-applications Meetings: Schedule and conduct pre-application meetings with
regulatory agencies to discuss project scope, poten tial impacts, and permitting
requirements as required.
C. Permit Application:
a. Nationwide Permit: Determine if the project qualifies for a Nationwid e Permit and
prepare the necessary documentation for submission.
b. Additional Permits: Identify and prepare applications for additional p ermits required,
such as local construction permits, water quality c ertifications, and coastal zone
consistency determinations.
D. Public Involvement:
a. Public Notices: Prepare and distribute public notices as required b y regulatory agencies
to inform the public about the project and solicit feedback.
VII. Construction Administration
A. Conformed Document Set: Upon completion of the procurement and contract aw ard process,
Collins will utilize addenda, clarifications and an y negotiations to updated construction
documents to one conformed set with the intention to issue for construction.
B. Meetings: Attend the preconstruction meeting and monthly pro gress meetings for a duration
up to 8 months of construction. Collins will also b e present at and document the substantial
completion inspection, the final completion inspect ion and the warranty inspection (post
construction).
C. RFIs and Submittals: Collins will review, evaluate and respond to up to 10 RFIs and 10 submittals
from the selected contractor.
D. Site Observations: Collins we perform observations of construction pr ogress on site twice
monthly for the duration of the project, up to 8 months from construction NTP.
E. Record Drawings: Upon completion of construction Collins will utili ze redline documents
provided by contractor to update the design drawings and generate record drawings. Collins will
also update the O&M manual with applicable changes applicable since draft issued at 100%
plans.
Page 26 of 332
Project Schedule
The following milestones are proposed, assuming a Notice to Proceed no later than October 1, 2026. Days
are in calendar days.
• Schematic Design: 75 days from NTP
• Detailed Design: 60 days from approval of SDs
• Final Design: 60 days from approval of DDs
• Issued for Construction: 120 days from approval of FDs
• Permitting: 240 days from SDs
• Construction Administration: As needed
Fees
Collins will provide the above scope of services on lump sum basis as follows. All of Collins’ rates are in
accordance with our 2026/2027 rate schedule. A summary of estimated labor hours is also provided.
Design.......................................................................................................... $113,020.00
Permitting ................................................................................................... $17,066.50
Surveying ..................................................................................................... $29,425.00
Geotechnical Investigation ......................................................................... $8,977.30
Construction Administration....................................................................... $41,810.00
Reimbursable Costs (travel, etc.) ................................................................ $2,349.00
Total Base Services ...............................................................................$21 2,647.80
In the event additional services are required, Collins recommends holding a budget of 10% for
unforeseen conditions or client driven change directives. It is proposed that the Additional Services task
will be executed only as authorized by Beaufort County, up to a total of $21,264.78.
Additional Services ............................... ...............................................$ 21 ,264.78
Total Proposed Fee ................................ ..............................................$ 233 ,912.58
Page 27 of 332
Assumptions and Conditions
A. This site lies within 1,500 LF of an active oyster reef and will require retention of the first 1.5”
rainfall on site.
B. Provide COLLINS with access to the site.
C. Provide COLLINS with any available construction and/or repair documents of the structure.
D. Provide COLLINS with a current geotechnical report of the proposed retaining wall site, sufficient
for design of the proposed wall.
E. Provide COLLINS with size, type, material and elevation of all utilities that enter the retaining wall
project area or may impact the retaining wall design.
Exemptions and Services not included
All services not listed under "Services" are consid ered Additional Services. The compensation for the se
services will be in addition to that for "Services." "Additional Services" include, but are not limited to the
following:
A. Visits to the site in excess of those noted in "Services" above.
B. Conducting condition assessments of existing facilities.
C. Engineering services incidental to project scope changes beyond COLLINS' control.
D. Control over or charge of safety procedures, precautions, and programs.
E. Construction administration and construction inspections beyond those listed in scope.
F. Performing site survey for record drawings.
Collins appreciates the opportunity to work with Be aufort County. Please feel free to contact Matthew
Barrow, Regional Manager, at 843-410-3720 or
mbarrow@collinsengr.com if you have any questions or
comments regarding this proposal.
Page 28 of 332
Determination of Price Reasonableness for Solicitation
Procurement Services Department
Solicitation Details
Date/Time:*
Aug 27, 2026 4:59 PM
Preparer:*
Bauer, Bryan
From:*
Bauer, Bryan
Department:*
Engineering
Solicitation Number:*
NA
Purpose:*
Edding's Point Boat Landing Improvement and Expansion
Background
Describe the relevant procurement, including a brief description of the product/service/scope of work.*
Staff requested a proposal from Collins Engineers, Inc under their marine engineering on-call, per the process identified in the on-call policy manual, for the design and permitting of improvement and expansion of the Edding's Point Boat Landing.
State procurement’s significance to the project or County operations.*
The Edding's Point Boat Landing was identified in the Beaufort County Public Boat Landing Facilities Study as a high-priority for future expansion. It is one of the busier boat landings in the County and lacks adequate pakring and amenities. The project was selected for FY 2026 ATAX funding.
Outline the procurement method utilized for this contract: (IFB, RFP, RFQ, Quotes).*
Collins Engineers, Inc was one of three consultants selected in the competitively bid RFQ # 040726 On-Call Marine and Coastal Engineering Services. Staff requested a proposal from Collins Engineers, Inc under their marine engineering on-call, per the process identified in the on-call policy manual, for the design and permitting of improvement and expansion of the Edding's Point Boat Landing.
https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 1/5
Page 29 of 332
Price Analysis
Summarize the bid (s)/quotes (s) received with their respective amounts.*
Collins proposal dated August 27, 2026 was for a fee of $206,664.80.
If applicable: note any previous price history for similar procurements.
Staff estimated the budget for the project to be $500,000 when submitting the ATAX application based on similar projects.
Comparisons with substantially similar items.*
The design of the Alljoy Boat Landing with similar scope was $495,000.The design of the Wimbee Creek boat landing with similar scope was $397,000.
Sales of the same item to other purchasers.*
NA
Analysis of the cost elements (e.g. labor rate and estimated hours, material rates, indirect costs, reasonable
profit)*
Projects have been priced as man-hour estimates with a not to exceed cost.
8/27/26, 5:25 PM Nintex Forms for SharePoint Lists
https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 2/5
Page 30 of 332
List and explain the benchmarks, market analysis, or other data sources used to evaluate price fairness.*
Price submitted is less than budget allotted and similar in price to previous projects.
Justification of Acceptance of Single Proposal/Bid
Consideration of re-solicitation?
Yes No
Consideration of reasons for a single applicant?
Yes No
Explain:
Collins Engineers, Inc was one of three consultants selected in the competitively bid RFQ # 040726 On-Call Marine and Coastal Engineering Services. Staff requested a proposal from Collins Engineers, Inc under their marine engineering on-call, per the process identified in the on-call policy manual, for the design and permitting of improvement and expansion of the Edding's Point Boat Landing.
Consideration of reasonable search for qualified applicants?
Yes No
Explain:
NA
Cost Analysis (if applicable)
Detail the cost elements (labor, materials, overhead, etc.) provided by the supplier or contractor.
NA
8/27/26, 5:25 PM Nintex Forms for SharePoint Lists
https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 3/5
Page 31 of 332
Provide an analysis of the necessity and reasonableness of each cost element.
NA
Vendor's Pricing Strategy (optional)
What is the vendor's pricing strategy?
Department Head Decision
Comments
Approve Disapprov
e
Department Head Signature
Bauer, Bryan
Date/Time
Aug 27, 2026 5:11 PM
Purchasing Decision
8/27/26, 5:25 PM Nintex Forms for SharePoint Lists
https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 4/5
Page 32 of 332
Comments
The price of the professional services is fair and reasonable and under the cost estimate. This procurement process complies with our procurement code.
Approve Disapprov
e
Purchasing Signature
Thomas, Dave
Date/Time
Aug 27, 2026 5:21 PM
8/27/26, 5:25 PM Nintex Forms for SharePoint Lists
https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 5/5
Page 33 of 332
Page 1 of 2
1. CONTRACT NAME AND NUMBER 2. TASK ORDER NO.: 3. EFFECTIVE DATE:
On-Call Marine and Coastal Engineering
RFQ #040726
Eddings Point Dock September 1, 2026
TASK ORDER FOR SERVICES
4. CONTRACTOR NAME, ADDRESS, PHONE, AND EMAIL:
Collins Engineers Inc.
5955 Core Rd, Suite 522
North Charleston, SC 29406
Matthew Barrow
mbarrow@collinsengr.com
5. ISSUED BY:
Beaufort County Procurement Services
PO Drawer 1228
Beaufort, SC 29901
For Questions Contact:
Gillian Murray
(843) 255-2287
Email: gmurray@bcgov.net
6. PROJECT NAME/TITLE AND DESCRIPTION:
Eddings Point Dock
1. Meetings
2. Schematic Design
3. Detailed Design
4. Final Design
5. 100% Design for bid documents
6. Permitting
7. Construction Administration
7. OTHER PERTINENT INFORMATION OR SPECIAL CONSIDERATIONS:
This task order is issued pursuant to the Scope and Fee Proposal dated August 27, 2026 and attached.
8. PAYMENT TYPE:
Vendor will be paid on a percentage complete basis with the submission of monthly invoices
9. LIQUIDATED DAMAGES
N\A
10. NUMBER OF DAYS/MONTHS
TO COMPLETE PROJECT
315 Days after issuance of Notice to
Proceed
11. TOTAL AWARD AMOUNT:
$212,647.80
12. Project Manager’s Name Mark Johnson
Project Manager’s Email mjohnson@bcgov.net
Project Manager’s Phone 843-255-2739
Page 34 of 332
Page 2 of 2
12. AUTHORIZED SIGNATURE FOR THE VENDOR:
a. SIGNATURE:
b. NAME/TITLE OF SIGNER:
c. DATE SIGNED:
13. AUTHORIZED SIGNATURE FOR THE COUNTY
a. SIGNATURE
b. NAME/TITLE OF SIGNER
c. DATE SIGNED
08/31/2026
Page 35 of 332
Timothy D. Weeks, PE
Senior Vice President
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
APPROVAL OF A CHANGE ORDER TO MAJ ENTERPRISES, INC. FOR THE SHELL POINT TRAFFIC CALMING
PROJECT ($53,592.09)
MEETING NAME AND DATE:
County Council October 12, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of a change order to MAJ Enterprises, Inc. for the Shell Point Traffic Calming
Project ($53,592.09)
PRESENTER INFORMATION:
Bryan Bauer, Director of Engineering (5 Minutes)
ITEM BACKGROUND:
On February 18, 2026 Beaufort County published an Invitation for Bid (IFB) # 032326 Shell Point Traffic
Calming requesting competitive bids for materials and installation of traffic calming measures in the Shell
Point neighborhood. Due to a resident complaint, one of the speed humps was moved to be further from their
driveway. Also, a catch basin was discovered at Broad River Drive and Shell Point Road that required a traffic
rated solid lid for the raised intersection. Additionally, construction quantities were substantially higher than
estimated for the Asphalt Surface Course. Due to these factors, the costs have exceeded the contract amount.
FISCAL IMPACT:
The change order for materials and construction in the amount of $48,720.09 is needed to complete and close
out the project. Staff recommends a 10% contingency of $4,872.00 for a total budget increase of $53,592.09.
The change order will be funded from the Capital Projects Fund Account No. 4000-80-1243-54500 with a
balance of $471,245.
APPROVAL HISTORY:
Resolution 2025/13 approved traffic-calming measures in the Shell Point neighborhood. On April 20, 2026 the
Public Facilities Committee approved a contract with M.A.J. Enterprises, Inc. for $170,108.96.
Page 36 of 332
Shell Point Traffic Calming
Estimated
Over/UnderLine Item Description Quantity Unit of MeasureUnit Cost Total Final Quant
1 1031000 Mobilization 1 LS $22,000.00 $22,000.00 1.00 22,000.00 $0.00
2 1032010 Bonds & Insurance 1 LS $8,500.00 $8,500.00 1.00 8,500.00 $0.00
3 1050800 Construction Stakes, Lines & Grades 1 EA $1,000.00 $1,000.00 1.00 1,000.00 $0.00
4 2012000 Clearing & Grubbing Within Roadway 1 LS $1,000.00 $1,000.00 1.00 1,000.00 $0.00
5 2033000 Liquid Asphalt Binder PG64-22 6 TN $366.67 $2,200.02 10.31 3,780.37 $1,580.35
6 4013990 Milling Existing Asphalt Pavement (Variable) 212 SY $16.00 $3,392.00 244.17 3,906.72 $514.72
7 4020320 Asphalt Base Course - Type B 10 TN $550.00 $5,500.00 9.25 5,087.50 -$412.50
8 4040340 Asphalt Surface Course - Type C 82 TN $525.00 $45,100.00 167.82 88,105.50 $45,055.50
9 6011000 Traffic Control 1 LS $15,000.00 $15,000.00 1.00 15,000.00 $0.00
10 6051120 Permanent Construction Signs (Ground Mounted) 496 SF $18.00 $8,928.00 94.00 1,692.00 -$7,236.00
11 6240110 4 In Yellow Solid Lines - Fast Dry Paint 60 LF $10.00 $600.00 324.00 3,240.00 $2,640.00
12 6240020 12 In White Solid Lines - Fast Dry Paint 350 LF $13.00 $4,550.00 400.00 5,200.00 $650.00
13 6240025 24 In White Solid Lines - Fast Dry Paint 50 LF $30.00 $1,500.00 50.00 1,500.00 $0.00
14 6281010 4 In White Solid Lines (edgline), High Build Paint - 25 mils 160 LF $30.00 $4,800.00 188.00 5,640.00 $840.00
15
6281105 4 In Yellow Solid Lines (centerline), High Build Paint - 25
mils 60 LF $35.00 $2,100.00 88.00 3,080.00 $980.00
16
6282020 12 In White Solid Lines, Sgl Comp. Hybridized Polymer - 25
mils 350 LF $50.00 $17,500.00 350.00 17,500.00 $0.00
17
6282025 24 In White Solid Lines, Sgl Comp. Hybridized Polymer- 25
mils 50 LF $60.00 $3,000.00 44.00 2,640.00 -$360.00
18 6510105 Flat Sheet, Type III, Fixed Size & Message Sign 178 SF $41.23 $7,338.94 152.00 6,266.96 -$1,071.98
19 6531210 U-Section Post for Sign Support - 3P 286 LF $10.00 $2,860.00 286.00 2,860.00 $0.00
20 7143618 18 In Smooth Wall Pipe 20 LF $100.00 $2,000.00 19.00 1,900.00 -$100.00
21 7149999 Cleaning Existing Pipe 120 LF $22.00 $2,640.00 34.09 750.00 -$1,890.00
22 7197052 Concrete Collar for up to 24 In Pipe 2 EA $750.00 $1,500.00 2.00 1,500.00 $0.00
23 8109901 Mowing 0.08 AC $6,250.00 $500.00 0.08 500.00 $0.00
24 8152007 Sediment Tube 4 EA $200.00 $800.00 4.00 800.00 $0.00
25 8153000 Silt Fence 100 LF $8.00 $800.00 100.00 800.00 $0.00
26 2031200 Site Excavation (including Borrow) 1 LS $3,500.00 $3,500.00 1.00 3,500.00 $0.00
27 8100102 Permanent Grassing for Resurfacing Projects 0.05 AC $30,000.00 $1,500.00 0.056 1,680.00 $180.00
CO 1 Removal of Speed Hump 1 EA $5,300.00 $5,300.00 1.00 5,300.00 $5,300.00
CO 2 Inlet Top for Storm Drain Structure Under Roadway (discovered) 1 EA $2,050.00 $2,050.00 1.00 2,050.00 $2,050.00
Page 37 of 332
Total $170,108.96 $48,720.09
$216,779.05
Reduced Price from $550 per ton
Page 38 of 332
SHELL POINT TRAFFIC CALMING
Scope of Work
The work will consist of furnishing all materials, labor and equipment for:
Construction of one raised intersection w ith minor improvements at the intersection of
Shell Point Road and Broad River Drive as well as three speed humps on Shell Point Road, five
on Broad River Drive and one on Dogwood Street.
All work under this contract shall be done in accordance with the South Carolina Department of
Transportation (SCDOT) Standards (specifications, supplemental specifications, drawings and
supplemental technical specifications); the latest edition of the Manual on Uniform Traffic
Control Devices (MUTCD) and all provisions of SCDOT Encroachment Permit No. 294120.
All materials used in the contract work must be furnished from SCDOT Qualified Products Listing
& Policies for Construction. A ll material certifications and submittals must be approved prior to
incorporation into the work.
It is preferred that the Prime Contractor be pre-qualified by SCDOT. All subcontractors must be
listed in the bid package or approved by the County in writing prior to performing work on the
project.
The contractor shall provide independent third party SCDOT Certified Quality Control
Inspections to include:
• Set-up roller patterns, monitor asphalt placement, verify temperature, receiving load
tickets.
• Document all work and inspections in accordance with SCDOT procedures. Provide
weekly copies of reports to County Project Manager.
• Provide independent SCDOT Certified inspector at plant during batching operations to
monitor and document product and tests in accordance with SCDOT requirements.
Project Administration:
Beaufort County Engineering
104 Industrial Village Rd, Bldg. 3
Beaufort, SC 29906
Project Administration will be provided by Beaufort County. Quality assurance inspection will
be performed by an independent firm hired by Beaufort County.
Page 425 of 522
Page 39 of 332
Contract Type:
Unit Rate
Quantities are approximate and payment shall be for measurements of actual in-place work as
per the plans and specifications. Any quantities exceeding the contract amount shall be requested
by the Contractor in writing, for approval by the County, prior to the work being performed.
Payment will not be made for additional quantities without prior written approval of the County.
The cost associated with any incidental items of construction in which no specific pay items are
set up for shall be included in the overall cost of the project.
Contract Documents:
Contract Documents include the Shell Point Traffic Calming IFB documents, construction plans
and the contract. The technical specifications (SCDOT Standards including Specifications,
Drawings, Supplemental Specifications and Supplemental Technical Specifications) for the
project are available online and are considered part of the contract documents.
Contract Time:
The Contractor shall agree to commence work under this contract within 10 working days after
the Notice to Proceed (NTP) is issued and complete all work within 60 calendar days from NTP.
The Contractor shall work continuously on the project after the Notice to Proceed is issued.
Any punch list work shall be completed within 30 calendar days.
Failure to complete all work within 60 calendar days plus any extension authorized in writing by
the County, or complete punchlist work within 30 calendar days, shall entitle the County to
deduct Liquidated Damages (LDs). LDs shall be deducted from the monies due the Contractor in
the amount of $600 for each calendar day in excess of the authorized construction time as per the
SCDOT schedule for liquidated damages 108.9.
Traffic Control:
Traffic Safety is paramount. The Contractor will be responsible for all traffic control, in
accordance with the Manual on Uniform Traffic Control Devices, SCDOT standards and all
other safety measures that will enhance the safety of the construction site. All costs associated
with this work shall be included in the bid price for traffic control. The Contractor shall submit a
traffic control plan for approval prior to beginning any work. Any changes to the approved traffic
control plan must be submitted and approved in writing.
The contractor shall designate a responsible person with sufficient qualifications who shall be
responsible for administering the traffic control plan. This representative shall have successfully
completed an advanced or supervisor work zone traffic control training program. The
representative shall be on-site anytime work is being performed in or adjacent to the roadway to
ensure proper installation, maintenance and removal of appropriate traffic control devices.
Preconstruction Conference:
The Contractor shall attend a pre-construction conference prior to commencing any work on site.
Page 426 of 522
Page 40 of 332
Construction Schedule:
The Contractor shall prepare a detailed schedule showing the sequence of operation and timeline
of all phases of construction. The schedule must be submitted and approved prior to beginning
work.
Utilities:
The Contractor will be responsible for all utility coordination, including required relocation, and
protection of utility facilities.
As-builts:
Contractor shall submit record drawings (marked with any changes) and post construction survey
invert elevations for the storm drain pipe.
Clarifications
Asphalt indexing using the SCDOT Index will not be utilized for this project.
The milling is intended for the parabolic areas of the raised intersection (6 ft) as well as parabolic
portions of the speed hump s (3 ft) each side to ensure a minimum lift of 150 lb/sy to the joint.
Time between milling and asphalt application will not exceed 5 calendar days.
Apply temporary paint striping, including stop bars and striping for the raised intersection and
speed humps immediately following paving operations.
There is no SWPPP for this project. Silt fence and sediment tubes w ill be installed as necessary
and per the direction of the Engineer.
The Unclassified Value within the contract, as per SCDOT may include but is not limited to:
rock, existing storm drain pipe, soil, relocating suitable materials from one location to another
location less than 3,000 LF, asphalt less than 2 inches thick, etc. Unclassified Value, when cross
sections are provided, will be paid at 100% of this value, divided over the estimated monthly pay
estimates based on the number of contract days. It is the contractor’s responsibility to bring to
the immediate attention (within 1 business day) of the County representative if in-field cross
sections do not conform to plan dimensions in order to be considered for additional payment.
Borrow Values within the contract, as per SCDOT will be quantified by measurement of placed
material. It is recommended the contractor perform elevation verifications prior to, and after
removal of surficial organic matter. After placement of borrow to defined cross sections, post
elevation verifications will be performed by the Couty to verify the placed borrow conforms to
cross sections. If existing elevation verifications are not performed simultaneously with and
agreed upon by county and contractor prior to borrow placement, elevations provided by cross
sections will be used for calculations of placed borrow. If approved in writing by country, truck
count method may be used.
Truck Count Method- A standard quantity of cubic yards per truck will be agreed upon prior to
the work. Daily random checks will be performed by the counties representative to verify the
truck bed dimensions and volume of fill. No payment will be made for volumes exceeding the
standard amount.
Page 427 of 522
Page 41 of 332
Page 428 of 522
Page 42 of 332
Page 429 of 522
Page 43 of 332
Page 430 of 522
Page 44 of 332
1
STATE OF SOUTH CAROLINA )
) CONTRACT
COUNTY OF BEAUFORT ) Shell Point Traffic Calming
THIS CONTRACT (hereinafter the "Contract") entered into this 8th day of April , 2026 , between the
COUNTY OF BEAUFORT, South Carolina, a public body corporate and politic and political subdivision
of the State of South Carolina, (hereinafter "County") and MAJ Enterprises, Inc. , (hereinafter the
"Contractor"), ("Party" as to each; collectively the "Parties")
WITNESSETH:
WHEREAS, the County wishes to contract for Shell Point Traffic Calming (the "Work" and/or
"Services"); and
WHEREAS, the Contractor has represented to the County that its staff is qualified to provide the Work
required in this Contract in a professional, timely manner; and
WHEREAS, the County has relied upon the above representations by the Contractor;
NOW, THEREFORE, in consideration of these premises and covenants set forth herein, it is agreed by and
between the Parties as follows:
SECTION ONE
Contract Documents
The Parties agree that the Contract Documents shall include the following, which are incorporated herein
by reference:
Exhibit A: Contractor's Bid dated March 23, 2026.
Exhibit B: IFB 032326
In the event of any conflict, discrepancy, or inconsistency among any of the documents which make up this
Contract, the following shall control:
As between the Contract and the Contract Documents which make up this Contract, the Contract
shall govern.
In the event of any conflict, discrepancy, or inconsistency among any of the Contract Documents,
the Contractor shall contact the County immediately upon discovery of the same for resolution by
the County.
Any documents not included or expressly contemplated in this Contract do not, and shall not, form
a part of this Contract. The Contract Documents are intended to be complementary, and a
requirement in one document shall be deemed a requirement in all documents.
SECTION TWO
Scope of Work
The Contractor agrees to perform and furnish all labor, supervision, materials, equipment, transportation
and supplies necessary for the completion of the Work required under this Contract in a timely and
Page 432 of 522
Page 45 of 332
2
workmanlike manner, professional in all aspects, and in accord with all applicable laws, rules and
regulations.
The Contractor shall provide the services outlined below in conjunction with the Contractor's Bid dated
March 23, 2026 marked as Exhibit A, that was previously incorporated by reference. The Contractor shall
commence the Work as specified in the Notice to Proceed, when it is issued, but not before it is issued.
Coordination of the Work and administration of this Contract shall be by Beaufort County.
SECTION THREE
Contract Price: Payment Terms
County agrees to pay for the performance of the Work described in this Contract, including all items
necessary to accomplish and complete the Work, in accordance with all terms and conditions as stated
herein on the following basis:
Contract Amount: One Hundred Seventy Thousand One Hundred Eight Dollars and Ninety-Six Cents
($170,108.96)
Payments:
Contractor will be paid on a line item by quantity basis with the submission of monthly invoices.
Monthly payments will be made based on a line item quantities of work in place. Final payment which shall
be paid upon Final Acceptance by the County's authorized representative. Final Acceptance is defined as
the County accepting the Work from the Contractor when the County deems the Work completed in
accordance with the terms of the Contract.
Final Payment is defined as the last payment from the County to the Contractor of the entire unpaid balance
of the Contract as adjusted by any approved change orders.
Application for payment shall be prepared and submitted electronically. All invoices shall be addressed to
Engineering Division, PO Drawer 1228 Beaufort SC 29901.
SECTION FOUR
Time: Term of Contract
The County hereby contracts with Contractor to provide the Work specified herein within Sixty (60)
calendar days after issuance of the Notice to Proceed.
The County reserves the right to extend the term of this Contract, if it is determined to be in its best interest.
The Contractor expressly acknowledges that time is of the essence in completion of this Contract and that
the time limits and dates herein are critical components of the Contract. Therefore, liquidated damages have
been set at $600 per calendar day. The Contractor warrants and represents that it has taken these facts into
consideration and has determined that it can complete the work within these time limits, including time for
likely delays caused by weather or from other sources. The Contractor will not be compensated for any
delays beyond the time set forth herein. The Contractor's only remedy for delays may be an extension of
time to perform the Work. Due consideration will be given to claims for an extension of time due to
extraordinary circumstances only.
Page 433 of 522
Page 46 of 332
3
SECTION FIVE
Insurance Requirements
The Contractor, at its own expense, shall at all times during the term of the Contract, maintain insurance as
included in the solicitation, Insurance Requirements, which is attached hereto and previously incorporated
by reference. The County may contact the Contractor's insurer(s) or insurer(s)' agent(s) directly at any time
regarding the Contractor's coverages, coverage amounts, or other such relevant and reasonable issues
related to this Contract. The Contractor shall also require any subcontractors to ca rry the same coverages
in the same amounts.
The County must be advised immediately of any changes in required coverages.
SECTION SIX
Compliance with Legal Requirements
All applicable federal, state and local laws, ordinances, and rules and regulations of any authorities
(including, but not limited to, any laws, ordinances or regulations relating to the S.C. Department of
Revenue or the S.C. Board of Contractors) shall be binding upon the Contractor throughout the pendency
of the Work. The Contractor shall be responsible for compliance with any such law, ordinance, rule or
regulation, and shall hold the County harmless and indemnify same in the event of non- compliance as set
forth in the Contract.
The Contractor certifies that it will comply with the applicable requirements of Title 8, Chapter 14 of South
Carolina Code of Laws (1976, as amended) and agrees to provide to the State upon request any
documentation required to establish either: (a) that Title 8, Chapter 14 is inapplicable to the Contractor and
its subcontractors or sub -subcontractors; or (b) that the Contractor and its subcontractors or
subsubcontractors are in compliance with Title 8, Chapter 14.
Pursuant to Section 8- 14-60, "A person who knowingly makes or files any false, fictitious, or fraudulent
document, statement, or report pursuant to this chapter is guilty of a felony and, upon conviction, must be
fined within the discretion of the Court or imprisoned for not more than five years, or both."
The Contractor agrees to include in any contracts with subcontractors, language requiring subcontractors
to (a) comply with applicable requirements of Title 8, Chapter 14, and (b) include in its contracts with the
subcontractors language requiring the sub- subcontractors to comply with the applicable requirements of
Title 8, Chapter 14.
The Contractor agrees to and shall certify agreement to abide by the requirements under Title VI of the
Civil Rights Act of 1964, and other non-discrimination authorities under Federal Executive Order Number
11246, as amended, and specifically the provisions of the equal opportunity clause.
The Contractor shall comply with all federal, state and local laws, ordinances, rules and regulations of any
authorities throughout the duration of this Contract. The Contractor shall be responsible for compliance
with any such law, ordinance, rule or regu lation, and shall hold the County harmless and indemnify same
in the event of non-compliance.
Page 434 of 522
Page 47 of 332
4
SECTION SEVEN
Drug-free Workplace Act
The Contractor shall comply with the South Carolina Drug-free Workplace Act, Section 44-107-10 et seq.,
S.C. Code of Laws (1976, as amended). The County requires all contractors executing contracts for a stated
or estimated value of $50,000 or more to sign a Drug-free Workplace Certification form prior to the issuance
of the Notice to Proceed.
SECTION EIGHT
Contractor's Warranties and Representations
The Contractor represents that its staff is knowledgeable about and experienced in performing the Work
required in this Contract and warrants that it will use best skill and attention to provide above described
Work in a professional, timely manner.
The Contractor warrants and represents that it shall be responsible for all subcontractors working directly
for it, as well as for their work product, as though the Contractor had performed the Work itself.
1. If equipment, materials and supplies are to be a part of the service provided, all equipment,
materials, and supplies incorporated in the Work covered by the bid and provided by the
Contractor are to be new and of the most suitable grade for the purpose intended. Unless
otherwise specifically provided in this Contract, reference to any equipment, material, article or
patented process, by trade name, make or catalog number, shall not be construed as limiting
competition. When requested, the Contractor shall furnish to the Purchasing Director, for
approval the name of the manufacturer, the model number, and other identifying data and
information respecting the performance, capacity, nature and rating of the machinery and
mechanical and other equipment which the Contractor contemplates incorporating in the Work.
When required by this Contract or when called for by the Purchasing Director, the Contractor
shall provide full information concerning the material or articles that he contemplates
incorporating in the Work. When so directed, samples shall be submitted for approval at the
Contractor's expense, with all shipping charges prepaid. Machinery, equipment, material and
articles installed or used without the required prior approval of the County shall be at the risk of
subsequent rejection by the County.
2. Any and all manufacturers' warranties on any equipment or materials will be passed on to the
County and copies of said warranties will be furnished by the Contractor to the County upon
completion and final acceptance of the Work.
3. The Purchasing Director may, in writing, require the Contractor to remove from the Work Site
any employee the Purchasing Director deems incompetent, careless or otherwise objectionable.
4. In addition to any manufacturer's warranties, all labor and materials are warranted to be free from
defects for a period of twelve (12) months after the date of Final Payment by the County.
Page 435 of 522
Page 48 of 332
5
SECTION NINE
Retention of Records
The Contractor agrees to maintain for three (3) years from the date of Final Payment, or until the end of
any audit or closure of all pending matters under this Contract, whichever is later, all books, documents,
papers, and records pertinent to this Contract. The Contractor agrees to provide to the County, any federal
grantor agency, the Comptroller General of the United States, any state gantor agency, any assignee, or any
of their duly authorized representatives access to such books, documents, papers, a nd records for the
purpose of examining, auditing, and copying them. The Contractor further agrees to include these
provisions in any subcontracts issued in connection with this Contract.
SECTION TEN
State and Local Taxes
Except as otherwise provided, Contract prices shall include all applicable state and local taxes.
The Contractor shall calculate that portion of the Contract that is subject to the six percent (6%) South
Carolina sales and/or use tax, and this amount shall be itemized and shown on all invoices, and shall be
paid to the SCDOR by Contractor. If Contractor is a non- South Carolina Company, the County will
withhold said amount from all invoices and remit payment to the SCDOR, unless the Contractor furnishes
the County with a valid South Carolina Use Tax Registration Certificate Number.
The Contractor shall indemnify and hold harmless the County for any loss, cost, or expense incurred by,
levied upon or billed to the County as a result of the Contractor's failure to pay any tax of any type due in
connection with this Contract.
The Contractor shall ensure that the above sections are included in all subcontracts and sub -subcontracts,
and shall ensure withholding on out of state sub and sub-subcontractors to which withholding is applicable.
SECTION ELEVEN
Independent Contractor
The Contractor is an independent contractor and shall not be deemed the agent or employee of the County
for any purpose whatsoever. Contractor shall not hold himself out as an employee of the County, and shall
have no power or authority to bind or obligate the County in any manner, except the County shall make
payment to the Contractor for work and expenses as herein provided. The Contractor shall obtain and
maintain all licenses and permits required by law for performance of this Contract by him or his employees,
agents, and servants. The Contractor shall be liable for and pay all taxes required by local, state or federal
governments, including but not limited to social security, Workers' Compensation, employment security,
and any other taxes and licenses or insurance premiums required by law. No employee benefits of any kind
shall be paid by the County to or for the benefit of the Contractor or its employees, agents, or servants by
reason of this Contract.
SECTION TWELVE
Other Contracts
The County reserves the right to undertake or award other contracts for additional work/services, and may
elect to complete portions of the Work/Services included in this Contract using its own forces or through
other contracts, and the Contractor shall fully cooperate with such other contractors, County employees and
Page 436 of 522
Page 49 of 332
6
carefully fit its own work/services to such work/services as may be directed by the County. The Contractor
shall not commit or permit any act by its forces or subcontractors which will interfere with the performance
of work/services by any other contractor or by County and or Department employees
SECTION THIRTEEN
Permits and Licenses
The Contractor shall, without additional expense to the County, be responsible for obtaining and
maintaining all necessary licenses and permits required by the State of South Carolina, a municipality or
the County or any other authority having jurisdiction. Prior to execution of a contract, the Contractor may
be required to provide a copy of its current applicable Contractor's License issued by the State of South
Carolina and business license issued by the County. Contractor's (and or any subcontractor's) L icense
Number, Person's Name and Business Name must all be shown on all required licenses.
SECTION FOURTEEN
Safety, Health, and Security Precautions
The Contractor shall take proper safety, health and security precautions to protect its workers and the
County's property, workers and the public at all times during the term of this Contract. All materials shall
be stored securely, protected from theft or damage.
SECTION FIFTEEN
Inspection and Acceptance
All Work shall be subject to inspection and test by the County at all reasonable times and places. The
Contractor shall, without charge, correct any workmanship found by the County not to conform to the
Contract requirements.
SECTION SIXTEEN
Conditions Affecting the Work
The Contractor shall be responsible for having taken steps reasonably necessary to ascertain the nature and
location of the Work, and the general and local conditions that can affect the Work or the cost thereof. Any
failure by the Contractor to do so will not relieve the Contractor from responsibility for successfully
performing the Work without additional expense to the County. The County assumes no responsibility for
any understanding or representations concerning conditions made by any of its officers o r agents prior to
the execution of this Contract, unless such understandings or representations by the County are expressly
stated in this Contract.
SECTION SEVENTEEN
Cleanup Work: Repair of Damages
During the performance of the Work, the Contractor shall continuously keep County-provided work space
(the "Work Site") and areas adjacent thereto in an orderly condition, free and clear from debris and
discarded materials.
Contractor will restore or replace, when and as directed by the County, any public or private property
damaged or destroyed by Contractor's work, equipment or employees to a condition at least equal to that
existing immediately prior to the beginning of the Work.
Page 437 of 522
Page 50 of 332
7
SECTION EIGHTEEN
Damages
The Contractor expressly agrees that if the Work, or any part thereof, is not performed or completed in a
timely or professional manner in accordance with this Contract or any amendment thereto, the Contractor
and its sureties shall be liable to the County for actual damages that relate to the Contractor's failure to
perform or complete the Work in the manner described above. If actual damages are agreed to by the County
and the Contractor or awarded by the Court, the County shall have the right to deduct f rom and retain out
of monies, which may be then due or which may become due and payable to the Contractor, the amount of
such actual damages; and if the amount so retained by the County is not sufficient to pay in full such actual
damages, the Contractor and/or its sureties shall pay to the County the amount necessary to effect payment
in full of such actual damages.
SECTION NINETEEN
Suspension of Work
The Purchasing Director may order, in writing, the Contractor to suspend, delay, or interrupt all or any part
of the Work for such period of time as he may determine to be appropriate for the convenience of the
County. The County may suspend performance of its obligations under this Contract in good faith for the
convenience of the County or to investigate matters arising in the Work.
The Purchasing Director may order suspension of the Work in whole or in part for such time as he deems
necessary because of the failure of the Contractor to comply with any of the requirements of this Contract,
and the Contract's completion date shall not be extended on account of any such suspension of Work.
When the Purchasing Director orders any suspension of the Work under the paragraph above, the Contractor
shall not be entitled to any payment for Work with respect to the period during which such Work is
suspended and shall not be entitled to any costs or damages resulting from such suspension.
The rights and remedies of the County provided in this Section are in addition to any other rights and
remedies provided by law or under this Contract.
SECTION TWENTY
Modification of Contract
The County's Purchasing Director has the unilateral right to modify this Contract, within the general scope
of work described above and in Exhibit B, when the modification is in the best interest of the County,
provided however, the Contractor is given wri tten notice of any such modification and the County is
responsible for paying Contractor for any additional expenses incurred by the Contractor that relate to the
modification. Subject to the above, the Contractor shall immediately notify the County in wri ting of any
proposed adjustment in its fee and the schedule for performance. The Contractor is obligated to perform
the revised contract when so directed by the Purchasing Director, and the County is obligated to pay for the
work performed pursuant to the modification. No claim by the Contractor for an adjustment hereunder shall
be allowed if asserted after Final Payment under this Contract.
SECTION TWENTY-ONE
Termination
Page 438 of 522
Page 51 of 332
8
1. For Convenience
The Purchasing Director, by advance written notice, may terminate this Contract when it is in the
best interests of the County. If this Contract is so terminated, the Contractor shall be compensated
for all necessary and reasonable direct costs of performing the Work actually accomplished. The
Contractor will not be compensated for any other costs in connection with a termination for
convenience. The Contractor will not be entitled to recover any damages in connection with a
termination for convenience.
2. For Default
If the Contractor refuses or fails to perform the Work or any separable part thereof in a timely or
workmanlike manner in accordance with the Contract Documents, or otherwise fails, in the sole
opinion of the County, to comply with any of the terms and conditions of the Contract Documents
deemed, in the sole opinion of the County, to be material (including, without limitation, the
requirement that Contractor obtain and maintain in force all necessary permits), such refusal or
failure shall be deemed a default under this Contract.
In the event of a default under this Section, the County shall have the right to inform the
Contractor of the default and demand that the Contractor immediately deliver a plan to remedy
the default. If the Contractor does not respond with a timely or reasonably achievable plan, the
County may terminate forthwith this Contract by additional written notice to the Contractor. In
the event of such default, the advance notice period for termination is waived and the Contractor
shall not be entitled to any costs or damages resulting from a termination under this Section.
Whether or not the Contractor's right to proceed with the Work is terminated, it and its sureties
shall be liable for any damage to the County resulting from the Contractor’s default. Any
wrongful termination for default shall be deemed by the Parties a termination for convenience.
3. Termination for Non-Appropriation of Funds
The Purchasing Director, by written advance notice, may terminate this Contract in whole or in
part in the event that sufficient appropriation of funds from any source (whether a federal, state,
County or other source) are not made or sufficient funds are otherwise unavailable, in either case,
to pay the charges under this Contract. If this Contract is so terminated, the Contractor shall be
compensated for all necessary and reasonable direct costs of performing the Work actually
provided to the date of such termination. The Contractor will not be compensated for any other
costs in connection with a termination for non-appropriation. The Contractor will not be entitled
to recover any damages in connection with a termination for non-appropriation, including, but not
limited to, lost profits.
4. Rights Cumulative
The rights and remedies of the County provided in this Section are in addition to any other rights
and remedies provided by law or under this Contract.
SECTION TWENTY-TW0
Indemnification
Except for expenses or liabilities arising from the negligence or intentional acts of the County, the
Contractor hereby expressly agrees to indemnify and hold the County harmless against any and all expenses
Page 439 of 522
Page 52 of 332
9
and liabilities arising out of the negligent or intentionally wrongful performance, action or inaction of the
Contractor in conduct of this Contract, as follows:
For matters other than those arising from the rendering or failure to render professional services, the
Contractor expressly agrees to the extent that there is a causal relationship between its negligence, action
or inaction, or the negligence, action or inaction of any of its employees or any person, firm or corporation
directly or indirectly employed by the Contractor and any damage, liability, injury, loss or expense (whether
in connection with bodily injury or death or property damage) that is suffered by the County and/or its
officers or employees or by any member of the public, to indemnify and save the County and its officers
and employees harmless against any and all liabilities, penalties, demands, claims, lawsuits, losses,
damages, costs, and expenses arising out of the negligence, action or inaction of the Contractor, regardless
of whether such liabilities, penalties, demands, claims, lawsuits, losses, damages, costs and expenses are
caused in part by the County. Such costs are to include, without limitation, defense, settlement and
reasonable attorney's fees incurred by the County and its employees. This promise to indemnify shall
include, without limitation, bodily injuries or death occurring to the Contractor's employees and any person,
directly or indirectly employed by the Contractor (including, without limitation, any employee of any
subcontractor), the County's officers or employees, the employees of any other independent contractors, or
occurring to any member of the public. When the County s ubmits notice, the Contractor shall promptly
defend any aforementioned action.
For matters arising out of the rendering or failure to render professional services, the Contractor will
indemnify and save the County and its officers and employees harmless from and against all liabilities,
penalties, demands, claims, lawsuits, losses, d amages, costs and expenses arising out of or resultant from
any negligent act, error or omission of the Contractor in the rendering or failure to render professional
services under this Contract. Such costs are to include, without limitation, defense, sett lement and
reasonable attorneys' fees incurred by the County and its officers and employees. This promise to indemnify
shall include, without limitation, bodily injuries or death occurring to the Contractor's employees and any
person, directly or indirectly employed by the Contractor (including, without limitation, any employee of
any subcontractor), the County's officers or employees, the employees of any other independent contractors,
or occurring to any member of the public. When the County submits notic e of a claim that triggers the
indemnity, the Contractor shall promptly defend any aforementioned action.
The limits of insurance required in this Contract shall not limit the Contractor's obligations under this
Section. The terms and conditions contained in this Section shall survive the termination of the Contract or
the suspension of the Work hereunder. To the extent that any liabilities, penalties, demands, claims,
lawsuits, losses, damages, costs and expenses are caused in part by the acts of the County, the Contractor’s
obligations shall be reduced in proportion to the County's fault. The obligations herein shall also extend to
any actions by the County to enforce this indemnity obligation. The recovery of costs and fees all extend
to those incurred in the enforcement of this indemnity.
SECTION TWENTY-THREE
Gratuities and Kickbacks
Gratuities. It shall be unethical for any person to offer, give or agree to give any employee or former
employee, or for any employee or former employee to solicit, demand, accept, or agree to accept from
another person a gratuity or an offer of employment in connection with any decision, approval, disapproval,
recommendation, preparation or any part of a program requirement or a purchase request, influencing the
content of any specification or procurement standard, rendering of advice, investigation, auditing, or in any
other advisory capacity in any proceeding or application, request for ruling, determination, claim or
Page 440 of 522
Page 53 of 332
10
controversy, or other particular matter pertaining to any program requirement of a contract or subcontract,
or to any solicitation or proposal therefore.
Kickbacks. It shall be unethical for any payment, gratuity, or offer of employment to be made by or on
behalf of a subcontractor under a contract to the prime contractor, or to hire any subcontractor or any person
associated therewith, as an inducement for the award of a subcontract or order.
Violation of this clause may result in Contract termination.
SECTION TWENTY-FOUR
Labor: Subcontractors
No subcontracts shall be allowed without the prior written approval of the County. The Contractor shall not
contract with a proposed person or entity to whom the County has made reasonable and timely objections.
The Contractor shall not be required to contract with anyone to whom the Contractor has made reasonable
and timely objection.
The Contractor shall enforce strict discipline and good order among its employees and other persons
carrying out the performance of the Contract.
Employment of labor by the Contractor shall be effected under conditions which are satisfactory to the
County. The Contractor shall remove or cause to have removed from the project any employee or employees
who are considered unsatisfactory by the County.
The Contractor assumes the responsibility for assuring that its working forces are compatible with the
County employees and the Contractor is responsible for making itself aware of those forces. The Contractor
will furnish a competent representative who is to be kept available to represent the Contractor for the
purpose of receiving notices, orders and instruction. No substitutions shall be made of such Contractor’s
representative without the approval of the County and a replacement by someone with comparable, skills,
experience and talent.
SECTION TWENTY-FIVE
Assignment
The Contractor shall not assign in whole or in part the Contract without the prior written consent of the
County or its Assignee. The Contractor shall not assign any money due or that may become due to it under
said the Contract without the prior written c onsent of the County or its Assignee. Each Party binds itself,
its successors, assigns, executors, administrators or other representatives to the other Party hereto and to
successors, assigns, executors, administrators or other representatives of such other Party in connection
with all terms and conditions of the Contract.
SECTION TWENTY-SIX
Controlling Law
The laws of South Carolina shall govern this Contract. All litigation arising under this Contract shall be
litigated only in a nonjury hearing in the Court of Common Pleas, Fourteenth Judicial Circuit, Beaufort
County, South Carolina.
Page 441 of 522
Page 54 of 332
11
SECTION TWENTY-SEVEN
Entire Contract
This Contract constitutes the entire understanding and contract between the Parties hereto and supersedes
all prior and contemporaneous written and oral contracts between the Parties and their predecessors in
interest regarding the subject matter of this Contract. This Contract may not be changed, altered, amended,
modified, or terminated orally, except as specifically provided, and any such change, alteration,
amendment, or modification must be in writing and executed by the Parties hereto.
SECTION TWENTY-EIGHT
Severance
Should any part of this Contract be determined by a Court of competent jurisdiction to be invalid, illegal,
or against public policy, said offending Section shall be void and of no effect and shall not render any other
Section herein, nor this Contract as a whole, invalid. Any terms which, by their nature, should survive the
suspension, termination or expiration hereof shall be deemed to so survive.
SECTION TWENTY-NINE
Non-waiver
Any waiver of any default by either Party to this Contract shall not constitute waiver of any subsequent
default, nor shall it operate to require either Party to waive, or entitle either Party to a waiver of, any
subsequent default hereunder.
Page 442 of 522
Page 55 of 332
Page 443 of 522
Page 56 of 332
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
RECOMMENDATION TO AWARD A CONTRACT TO APAC ATLANTIC, INC FOR THE SUNSET BLVD / MILLER DRIVE
ROADWAY RESURFACING AND TRAFFIC CALMING PROJECT ($739,873.48)
MEETING NAME AND DATE:
County Council October 12, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval to award contract to APAC Atlantic for the Sunset Blvd / Miller Drive roadway
resurfacing and traffic calming project ($739,873.48)
PRESENTER INFORMATION:
Bryan Bauer, Director of Engineering (5 min)
ITEM BACKGROUND:
This project is part of the 2018 Sales Tax Program and is governed by an encroachment permit between
SCDOT and Beaufort County. Project includes resurfacing of 0.35 miles of Sunset Boulevard (S-186) & Miller
Drive West (S-187) Project. (Sunset blvd from Sea Island Parkway to intersection of Miller Drive West and
Miller Drive West from Sunset Boulevard to Sam’s Point Road). Traffic calming installation within the project
roadways is also included within the scope of work.
FISCAL IMPACT:
The contract fee for materials and construction is $672,612.25. Staff recommend a contingency of 10%
($67,261.23) bringing the project requested budget to be $739,873.48. The funding for this project is from
Account No. 4705-80-0000-S4500-LIMP with a balance of $26,100,000
APPROVAL HISTORY:
Resolution 2025/46 Project redefined (by council) July 14, 2025
Page 57 of 332
Beaufort County, SC
Procurement
David Thomas, Director
PO Box 1228, Beaufort, SC 29902
EVALUATION TABULATION
IFB No. 082626
Sunset-Miller Resurfacing &Traffic Calming
RESPONSE DEADLINE: August 26, 2026 at 3:00 pm
Report Generated: Wednesday, August 26, 2026
SELECTED VENDOR TOTALS
Vendor Total
APAC Atlantic, Inc. $672,612.25
TABLE 1
APAC Atlantic, Inc.
Selected Line Item Description Quantity Unit of
Measure
Unit Cost Total
X 1031000 MOBILIZATION 1 LS $52,000.00 $52,000.00
X 1032010 BONDS AND INSURANCE 1 LS $5,000.00 $5,000.00
X 1050800 CONSTRUCTION STAKES, LINES & GRADES 1 EA $10,000.00 $10,000.00
X 2012000 CLEARING & GRUBBING WITHIN ROADWAY 1 LS $23,000.00 $23,000.00
X 2016010 LIMB TRIMMING 1 LS $60,000.00 $60,000.00
X 2025000 REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 180 SY $34.00 $6,120.00
X 2031000 UNCLASSIFIED EXCAVATION 31 CY $200.00 $6,200.00
X 2033000 BORROW EXCAVATION 6 CY $440.00 $2,640.00
Page 58 of 332
EVALUATION TABULATION
IFB No. 082626
Sunset-Miller Resurfacing &Traffic Calming
EVALUATION TABULATION
Invitation For Bid - Sunset-Miller Resurfacing &Traffic Calming
Page 2
APAC Atlantic, Inc.
Selected Line Item Description Quantity Unit of
Measure
Unit Cost Total
X 2081001 FINE GRADING 186 SY $23.00 $4,278.00
X 2091000 SELECT MATERIAL FOR SHOULDERS & SLOPES 100 CY $78.00 $7,800.00
X 4011004 LIQUID ASPHALT BINDER PG64-22 91 TON $800.00 $72,800.00
X 4012060 FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 500 SY $85.00 $42,500.00
X 4013110 MILLING EXISTING ASPHALT PAVEMENT 1.0" 4459 SY $5.50 $24,524.50
X 4013115 MILLING EXISTING ASPHALT PAVEMENT 1.5" 4877 SY $5.35 $26,091.95
X 4013990 MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 270 SY $52.00 $14,040.00
X 4020320 ASPHALT BASE COURSE - TYPE B 56 TON $200.00 $11,200.00
X 4030330 ASPHALT INTERMEDIATE COURSE TYPE C 33 TON $275.00 $9,075.00
X 4040340 ASPHALT SURFACE COURSE TYPE C 1268 TON $148.00 $187,664.00
X 6011000 TRAFFIC CONTROL 1 LS $71,000.00 $71,000.00
X 6051120 PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 240 SF $10.00 $2,400.00
X 6240010 4" WHITE SOLID LINES (PVT EDGE LINES) - FAST DRY PAINT 9288 LF $0.20 $1,857.60
X 6240015 8" WHITE SOLID LINES (CROSSWALK&CHANNELIZATION)-FAST DRY
PAINT
1848 LF $0.20 $369.60
X 6240020 12" WHITE SOLID LINES - FAST DRY PAINT 864 LF $0.30 $259.20
Page 59 of 332
EVALUATION TABULATION
IFB No. 082626
Sunset-Miller Resurfacing &Traffic Calming
EVALUATION TABULATION
Invitation For Bid - Sunset-Miller Resurfacing &Traffic Calming
Page 3
APAC Atlantic, Inc.
Selected Line Item Description Quantity Unit of
Measure
Unit Cost Total
X 6240025 24" WHITE SOLID LINES (STOP/DIAG LINES)-FAST DRY PAINT 600 LF $1.25 $750.00
X 6240110 4" YELLOW SOLID LINES (PVT. EDGE LINES) FAST DRY PAINT 402 LF $0.20 $80.40
X 6271010 4" WHITE SOLID LINES (PVT EDGE LINES) - THERMO. -90 MIL. 3096 LF $1.00 $3,096.00
X 6271015 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 616 LF $3.75 $2,310.00
X 6271020 12" WHITE SOLID LINES - THERMO. - 125 MIL. 288 LF $5.50 $1,584.00
X 6271025 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL. 200 LF $11.50 $2,300.00
X 6271074 4" YELLOW SOLID LINES (PVT. EDGE LINES) THERMO.-90 MIL. 6465 LF $1.00 $6,465.00
X 6301100 PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 45 EA $12.50 $562.50
X 6510105 FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 134 SF $30.00 $4,020.00
X 6531210 U-SECTION POST FOR SIGN SUPPORTS - 3P 242 LF $12.00 $2,904.00
X 8100101 PERMANENT GRASSING FOR SMALL PROJECTS 1.02 ACRE $4,225.00 $4,309.50
X 8151201 HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 1 0.09 ACRE $12,500.00 $1,125.00
X 8153000 SILT FENCE 381 LF $6.00 $2,286.00
Total $672,612.25
VENDOR QUESTIONNAIRE PASS/FAIL
Page 60 of 332
EVALUATION TABULATION
IFB No. 082626
Sunset-Miller Resurfacing &Traffic Calming
EVALUATION TABULATION
Invitation For Bid - Sunset-Miller Resurfacing &Traffic Calming
Page 4
Question Title APAC Atlantic, Inc.
Certification Pass
Contact information of authorized representative? Pass
Please Provide Licenses and Certificate of Insurance Pass
100% Labor and Material Payment Bond Pass
Bidder Confirmation Pass
Communications Pass
Are you submitting this bid as a local vendor? Pass
Local Vendor Preference - Participation Affidavit Pass
Non-Collusion Affidavit of Prime Bidder Pass
Will you be using subcontractors? Pass
Non-Collusion Affidavit of Subcontractor Pass
Certification By Contractor Regarding Non-Segregated Facilities Pass
Business Organization
Type of Business Organization: Pass
If you selected "Other" for your type of business, please explain: Pass
If applicable, please provide name of partners and additional information
below:
Pass
If your agency is a Corporation: Pass
Are you a Subchapter S Corporation? Pass
Please provide Subchapter S Shareholders: No Response
If individually owned: Pass
Have you ever operated under another name? Pass
Page 61 of 332
EVALUATION TABULATION
IFB No. 082626
Sunset-Miller Resurfacing &Traffic Calming
EVALUATION TABULATION
Invitation For Bid - Sunset-Miller Resurfacing &Traffic Calming
Page 5
Question Title APAC Atlantic, Inc.
Please provide all other business names and addresses of principal place of
business for each business:
Pass
Bonding
Bid Bond Pass
Please provide the Bonding information: Pass
Do you intend to use any alternative form of security Pass
Indicate the form of security you intend to use and the name, address, point of
contact, and telephone number of the banks, savings and loan, or surety you
intend to use. (NOTE: Prequalification will not assure acceptance of any form
of security.)
No Response
Have any Performance or Payment Bond claims ever been paid by any surety
on behalf of your organization?
Pass
State the name of the project(s); the date; the name, address, telephone
number, and contact person for the claimant; the surety satisfying the claim;
the size of the claim; and the circumstances giving rise to the claim.
No Response
Have you ever arbitrated or litigated a claim with an Owner, Architect, or
Engineer in the last five years?
Pass
State the name of the project(s); the date; the name, address, telephone
number, and contact person for the claimant; the surety satisfying the claim;
the size of the claim; and the circumstances giving rise to the claim. (Provide
attachments if necessary.)
No Response
Have you or any officer, partner, or owner of your organization, in any state or
territory of the United States, or with respect to any agency of the Federal
government:
In the last in the last five years, received any fines or citations for building code
violations which were unrelated to design?
Pass
Page 62 of 332
EVALUATION TABULATION
IFB No. 082626
Sunset-Miller Resurfacing &Traffic Calming
EVALUATION TABULATION
Invitation For Bid - Sunset-Miller Resurfacing &Traffic Calming
Page 6
Question Title APAC Atlantic, Inc.
Provide the name, address, telephone number, contact person, and
circumstances relating to the question.
No Response
Ever been found to be guilty of charges relating to conflicts of interest: Pass
Provide the name, address, telephone number, contact person, and
circumstances relating to the question.
No Response
Ever been convicted on charges related to any criminal activity relating to
construction means, methods, or techniques; bidding or bid rigging; or
bribery?
Pass
Provide the name, address, telephone number, contact person, and
circumstances relating to the question.
No Response
In the last five years, been found guilty of any minority contracting law
violations?
Pass
Provide the name, address, telephone number, contact person, and
circumstances relating to the question.
No Response
In the last five years, pleaded no contest in any criminal proceeding related to
contracting?
Pass
Provide the name, address, telephone number, contact person, and
circumstances relating to the question.
No Response
Ever been disbarred from doing Federal, state, or local government work for
any reason?
Pass
Provide the name, address, telephone number, contact person, and
circumstances relating to the question.
No Response
Ever been terminated on a contract due to your default? Pass
Provide the name, address, telephone number, contact person, and
circumstances relating to the question.
No Response
In the last five years, paid liquidated damages for being late on a project? Pass
Page 63 of 332
EVALUATION TABULATION
IFB No. 082626
Sunset-Miller Resurfacing &Traffic Calming
EVALUATION TABULATION
Invitation For Bid - Sunset-Miller Resurfacing &Traffic Calming
Page 7
Question Title APAC Atlantic, Inc.
Provide the name, address, telephone number, contact person, and
circumstances relating to the question.
No Response
In the last five years, been subject to tax collection proceedings? Pass
Provide the name, address, telephone number, contact person, and
circumstances relating to the question.
No Response
In the last seven years, filed for bankruptcy? Pass
Provide the name, address, telephone number, contact person, and
circumstances relating to the question.
No Response
Under what chapter of bankruptcy did you file? No Response
If you filed under Chapter 11 Reorganization, how long did you operate under
this status?
No Response
Are you operating under Chapter 11 status now? No Response
Safety
Have you, in the last three years, been cited for willful violations for failure to
abate, or for repeated violations, by the United States Occupational Safety and
Health Administration or by the South Carolina Occupational Safety and Health
Administration or by any other governmental body?
Pass
State date, name, address, telephone number, and contact person for agency
issuing citation and the nature of the violation. Also, advise the amount of
fines paid, if any. Provide attachments if necessary.
No Response
List your worker’s compensation experience modifier for the last three years. No Response
References
Provide at least two references from each industry group listed. Provide other
references as requested. Provide current names, addresses, telephone
numbers, and contacts.
Pass
Page 64 of 332
EVALUATION TABULATION
IFB No. 082626
Sunset-Miller Resurfacing &Traffic Calming
EVALUATION TABULATION
Invitation For Bid - Sunset-Miller Resurfacing &Traffic Calming
Page 8
Question Title APAC Atlantic, Inc.
Certification regarding Debarment, Suspension, Ineligibility, and Voluntary
Exclusion:
The contractor certifies: Pass
Explain fully if it has been involved in any litigation involving performance. No Response
Small and Minority Business Participation Program
Are you a Small or Minority Business ? Pass
Upload your Small/Minority Documentation No Response
Are you self-performing 100%? Pass
Self-Performing 100% Affidavit No Response
Good Faith Agencies Distribution List Pass
Page 65 of 332
Determination of Price Reasonableness for Solicitation
Procurement Services Department
Solicitation Details
Date/Time:*
Aug 31, 2026 3:24 PM
Preparer:*
Sloan, Robert
From:*
Sloan, Robert
Department:*
Engineering
Solicitation Number:*
IFB - 082626
Purpose:*
Sunset Blvd / Miller Drive Resurfacing and traffic calming
Background
Describe the relevant procurement, including a brief description of the product/service/scope of work.*
Resurfacing of 0.35 miles of Sunset Boulevard (S-186) & Miller Drive West (S-187) Project. ( Sunset blvd from Sea Island Parkway to the intersection of Miller Drive West and Miller Drive West from Sunset Boulevard to Sam’s Point Road). “Traffic calming” installation within the project roadways is also included within the Scope of Work.
State procurement’s significance to the project or County operations.*
This project is part of the 2018 Sales Tax Program and is governed by an intergovernmental agreement and encroachment permit between SCDOT and Beaufort County.
Outline the procurement method utilized for this contract: (IFB, RFP, RFQ, Quotes).*
On July 24, 2026 Beaufort County published an invitation to bid (IFB 082626) . One bid was received by the deadline of August 26, 2026 and was within expected project cost estimates as determined by a qualified engineering and construction consultant (ICE).
https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 1/5
Page 66 of 332
Price Analysis
Summarize the bid (s)/quotes (s) received with their respective amounts.*
One bid submittal was received from APAC Atlantic Inc. Total Bid was $672,612.25 as compared to Engineers pre-bid estimate of $705,869.64
If applicable: note any previous price history for similar procurements.
Beaufort County has used APAC Atlantic previously and have achieved satisfactory results.
Comparisons with substantially similar items.*
Consultant J. Bragg evaluated the bid as compared to projects of similar scope and size.
Sales of the same item to other purchasers.*
substantially similar pricing
Analysis of the cost elements (e.g. labor rate and estimated hours, material rates, indirect costs, reasonable
profit)*
project was bid by unit rates
9/1/26, 4:20 PM Nintex Forms for SharePoint Lists
https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 2/5
Page 67 of 332
List and explain the benchmarks, market analysis, or other data sources used to evaluate price fairness.*
pricing within the ranges of similar project work
Justification of Acceptance of Single Proposal/Bid
Consideration of re-solicitation?
Yes No
Consideration of reasons for a single applicant?
Yes No
Explain:
Price proposal was within the expected costs of the project as bid.
Consideration of reasonable search for qualified applicants?
Yes No
Explain:
Project was put out for public bid.
Cost Analysis (if applicable)
Detail the cost elements (labor, materials, overhead, etc.) provided by the supplier or contractor.
9/1/26, 4:20 PM Nintex Forms for SharePoint Lists
https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 3/5
Page 68 of 332
Provide an analysis of the necessity and reasonableness of each cost element.
Vendor's Pricing Strategy (optional)
What is the vendor's pricing strategy?
Department Head Decision
Comments
J. Bragg, the 2018 Sales Tax Program manager, has evaluated the bid and recommended approval. The contractors bid is approximately 7% less than the engineers estimate.
Approve Disapprov
e
Department Head Signature
Bauer, Bryan
Date/Time
Sep 1, 2026 8:12 AM
Purchasing Decision
9/1/26, 4:20 PM Nintex Forms for SharePoint Lists
https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 4/5
Page 69 of 332
Comments
Approve Disapprov
e
Purchasing Signature
Thomas, Dave
Date/Time
Sep 1, 2026 8:35 AM
9/1/26, 4:20 PM Nintex Forms for SharePoint Lists
https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x010067538D3D0D6C2243A7E3698E8EFB131400D4512833729ED54A91C809F9DD964505… 5/5
Page 70 of 332
Page 71 of 332
Page 72 of 332
Page 73 of 332
Page 74 of 332
Page 75 of 332
Page 76 of 332
Page 77 of 332
Page 78 of 332
Page 79 of 332
Page 80 of 332
Page 81 of 332
Page 82 of 332
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
APPROVAL OF A TASK ORDER TO HDR ENGINEERING, INC FOR THE PRELIMINARY ENGINEERING FOR
ALTERATIONS TO THE CHOWAN CREEK BRIDGE APPROACHES ($212,630)
MEETING NAME AND DATE:
County Council October 12, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of task order to HDR Engineering, Inc. for the preliminary design and engineering
of alterations to the Chowan Creek Bridge in the amount of $212,630.
PRESENTER INFORMATION:
Bryan Bauer, PE - Director of Engineering (5 min)
ITEM BACKGROUND:
The Chowan Creek bridge has been noted as a choke point along US 21 on St. Helena Island in emergency
situations. The bridge was also identified in the Beaufort County Roadway Vulnerability Study completed in
2025. The project has been included in the 2026 Transportation Sales Tax referendum. This task order will
enable the County to begin preliminary engineering and design for alterations to provide congestion relief
during emergency situations. The concept will be to restipe the bridge to allow for a center median and widen
the approaches on both sides for the additional lane width requirements.
HDR Engineers, Inc was one of ten consultants selected in the competitively bid RFQ # 032626 On-Call
Transportation Roadway Design.
FISCAL IMPACT:
The fee for HDR Engineering, Inc. for the preliminary design and engineering of alterations to the Chowan
Creek Bridge is $193,300. Staff recommends a 10% contingency of approximately $19,330 for a total of
$212,630. Funding for this project is from TAG account number 2342-30-0000-51160 with a balance of
$1,868,672.00.
APPROVAL HISTORY:
Page 83 of 332
hdrinc.com
1201 Main Street, Suite 800, Columbia, SC 29201-3271
(803) 509-6600
September 3, 2026
Bryan Bauer
Director of Engineering
Beaufort County Engineering
100 Ribaut Road
Beaufort, SC 29902
Re: US 21 @ Chowan Creek Preliminary Plans
2026 On-Call Transportation Roadway Design
Task Order #1
HDR # 10473069
Dear Mr. Bauer:
HDR Engineering, Inc. (HDR) appreciates this opportunity to provide Beaufort County with a proposal to
provide engineering services associated with the preliminary plans for the US21 at Chowan Creek
widening. Based on the scope of services, deliverables and schedule outlined below, HDR, and its sub-
consultant will survey the project, develop preliminary engineering plans, and assist with moving forward.
The Scope of Services is outlined below:
PURPOSE
Beaufort County wishes to obtain preliminary plans for US 21 at Chowan Creek . These modifications
include but are not limited to adding a center two way left turn lane (TWLTL) from 750’ south of Chowen
Creek Bluff to 500’ north of Warsaw Road. This will include re-striping the existing 510’ long bridge. HDR
will coordinate surveys, study the proposed typical section, and develop preliminary plans. Assumptions for
the project are as follows:
• Preliminary plans will include typical elements from the SCDOT Roadway Design Manual,
• Utility coordination will include early utility coordination and contact, but no SUE will be acquired.
• Environmental studies will be limited to wetland delineation to evaluate potential impacts.
• Typical section studies will be performed to determine lane widths, shoulder widths, and drainage
alternatives. Potential design exceptions or variances will be noted but not acquired.
• No geotechnical investigations will be conducted regarding these plans.
• Survey will occur for 75’ from the existing centerline for a length of 75’. No underwater survey will
be conducted.
• Plans will be provided to County review 3 months from NTP.
For this proposal, HDR Engineering Inc. will be referred to as the CONSULTANT. McKim and Creek will be
referred to as the SUBCONSULTANT . The widening plans will be referred to as the PROJECT , and
Beaufort County, SC will be referred to as the CLIENT.
Docusign Envelope ID: B08FEC3B-167F-8A95-80B0-151ED0500083
Page 84 of 332
Page 2 of 5
Scope of Services
1. PROJECT MANAGEMENT
The CONSULTANT will coordinate with the CLIENT to prepare a schedule for the proposed project.
Coordination meetings will occur monthly during the life of the project. The CONSULTANT will coordinate
with the CLIENT for ny specific design standards. Invoicing will occur monthly. The CONSULTANT will
coordinate with the SUBCONSULTANT for survey needs.
2. SURVEYS
Field surveys will be performed to determine accurate elevations and locations of existing facilities, e.g.,
roadways, bridges, culverts, utilities, and other physical feature needed for design and to provide ground
controls for all design surveys. Surveys along the entire project will include the items listed below:
1. All surveys will be based on SC State Plane Coordinate System using NAD-83 and
elevations on NAVD 1988 datum.
2. Survey Control Points shall be distributed throughout the project at 500-foot intervals.
Survey control points shall be inter-visible from two other survey control points. A
minimum of 4 survey control points shall be established along the survey corridor and
shall be established outside the physical limits of disturbance.
3. Survey existing centerline alignment of US-21.
4. Cross-sections will be taken at 50’ intervals from the existing roadway centerline to 75’
left and right for 3,000’ US-21.
5. Locate all planimetric features such as edge of pavement, structures, utilities, residential
trees, residential shrubs, tree lines, streams, fences, driveways, and mailboxes from the
centerline to 75’ left and right. Locate all specimen trees as required by the County.
Surveyor shall contact PUPS 811 design location service to mark all utility lines.
The surveyor will be provided with existing utility and right of way plans prior to
beginning survey work if available. Surveyor shall locate marked existing utilities
and utility ROW based on plans, if provided.
6. Locate all drainage and sanitary sewer structures from the centerline to 75’ left and right.
Locate the system upstream, whether a ditch or pipe. All pipes shall be located and
elevations, types, and size shall be provided.
7. Horizontally and vertically locate all potential outfall drainage ditches and streams. At all
outfalls obtain cross-sections 100 feet upstream and/or 100 feet downstream using a 40’
corridor (20’ on either side of the ditch centerline).
8. Public records research of all properties (approximately 10 tracts) that may be impacted
by the construction of the proposed project will be conducted. Where available in the
public record, the current owner’s name, address, tax map number, total area of parcel,
and corresponding Plat Book with page and/or Deed Book with page Number(s) for the
property owners as listed on the Tax Assessor’s records will be provided. This
information will be provided to the COUNTY in the form of a Microsoft Excel, with one
copy each of the electronic and hardcopy versions of the file. Search and survey all
detectable property corners and pins of tracts that may be impacted. The location and
bearings of property lines intersecting the proposed right of way will be determined by
surveyed corners or by data from available records where corners cannot be found.
Information used to compute property lines will be limited to data that is part of the public
Docusign Envelope ID: B08FEC3B-167F-8A95-80B0-151ED0500083
Page 85 of 332
Page 3 of 5
record. This property strip map is considered a partial survey and does not constitute a
full boundary survey.
9. An electronic property strip map which will include the names of property owners and
their tax map number and will be prepared in Openroads format.
3. ROADWAY DESIGN
Design will be completed in accordance with the policies and practices of SCDOT as described in the
SCDOT Roadway Design Manual and Standard Specifications for Road Construction. Items not covered
by these sources will be as provided by the American Association of State Highway and Transportation
Officials (AASHTO).
Plans will be developed at a 1”=20’ scale.
1. Preliminary Plans
Preliminary plans will be developed by the CONSULTANT to illustrate the alignment, grades, cross
sections, construction limits, relevant dimensions, and location of existing features and proposed
improvements. A typical section of the proposed improvements will be pr epared to provide the
standard section of improvement, pavement types and application rates, cross slopes, and limits
of improvement. The plan, profile, and cross section sheets will show information necessary to
permit construction stakeout and to indicate and delineate details necessary for construction.
2. Design Refinement & Comment Resolution
Comments generated by the CLIENT’s review of the preliminary plans will be consolidated into a
matrix to track the resolution of comments. The CONSULTANT will revise the project design and
resubmit the plans in accordance with the accepted resolution to each comment generated by the
CLIENT.
Deliverables: Preliminary plans will be provided electronically in PDF format.
4. DRAINAGE DESIGN
The CONSULTANT will develop drainage calculations, as necessary to facilitate preliminary plans. The
stormwater design will be prepared in accordance with the SCDOT Requirements for Hydraulic Design
Studies manual dated May 26, 2009.
The CONSULTANT will review the stormwater runoff for quantity and quality and make recommendations
based on potential impacts. The CONSULTANT will not include a stormwater permit application.
The locations of proposed drainage features will be shown on the roadway plan sheets.
Deliverables: Drainage calculations and plans will be provided in PDF format.
5. ENVIRONMENTAL
The CONSULTANT will not include obtaining any permits needed to construct the project. Only wetland
delineation and threatened and endangered (T&E) habitat surveys will occur. GPS located wetlands will
be shown on the plans.
Deliverables: Wetland delineation survey and T&E Survey Memo.
Docusign Envelope ID: B08FEC3B-167F-8A95-80B0-151ED0500083
Page 86 of 332
Page 4 of 5
6. UTILITY COORDINATION
Preliminary utility coordination will occur with the appropriate utility owners by contacting them
and reviewing documents provided. We assume that up to five utilities will be within the project
limits. They will be contacted during the development of preliminary design plans. We assume
that up to two field visits will be necessary during preliminary utility coordination. A preliminary
report containing an assessment of the effected utility owners and a review of their possible prior
rights will be submitted to the CLIENT.
Deliverables: Preliminary Utility Contact Report will be provided in PDF format.
Items Not Included In Scope
• Geotechnical Engineering
• Pavement Design
• Subsurface Utility Engineering (SUE)
• Utility Relocation Design
• Environmental Resource Surveys (Haz-Mat, Cultural Resources)
• Wetland Permitting
• Right of Way Staking
• Right of Way Acquisition
• Construction Engineering and Inspection
• Permitting Fees
SCHEDULE
Survey will be completed within one ( 1) month of NTP. Submittal of the preliminary plans to the CLIENT
will be two (2) months from completion of the survey.
FEE
HDR proposes to perform the tasks described in this proposal as outlined below:
Task 1 PROJECT MANAGEMENT $ 29,900.00 (122 manhours)
Task 2 SURVEYS $ 39,800.00 (16 manhours)
Task 3 ROADWAY DESIGN $ 67,700.00 (340 manhours)
Task 4 DRAINAGE DESIGN $ 30,500.00 (204 manhours)
Task 5 ENVIRONMENTAL $ 9,200.00 (66 manhours)
Task 6 UTILITY COORDINATION $ 16,200.00
(64 manhours)
Total
$ 193,300.00 (812 manhours)
Docusign Envelope ID: B08FEC3B-167F-8A95-80B0-151ED0500083
Page 87 of 332
Page 5 of 5
Once again, HDR appreciates this opportunity to provide assistance to the Beaufort County. We look
forward to working with you on this project. Please call 803-509-6626 with any questions or comments
you may have.
Sincerely,
HDR ENGINEERING, INC.
__________________________
Phillip Hutcherson, P.E.
Project Manager
________________________
Jennifer Mustar, P.E. VP
South Carolina Area Manager
Docusign Envelope ID: B08FEC3B-167F-8A95-80B0-151ED0500083
Page 88 of 332
Page 1 of 2
1. CONTRACT NAME AND NUMBER 2. TASK ORDER NO.: 3. EFFECTIVE DATE:
On Call Transportation Engineering
Services (Design) RFQ 032626
FY27 Chowen Creek September 3, 2026
TASK ORDER FOR SERVICES
4. CONTRACTOR NAME, ADDRESS, PHONE, AND EMAIL:
HDR
1201 Main Street, Suite 800, Columbia, SC 29201
803-509-6600
Phillip Hutcherson
Phillip.Hutcherson@hdrinc.com
5. ISSUED BY:
Beaufort County Procurement Services
PO Drawer 1228
Beaufort, SC 29901
For Questions Contact:
Gillian Murray
Senior Buyer
(843) 255-2295
Email: gmurray@bcgov.net
6. PROJECT NAME/TITLE AND DESCRIPTION:
US 21 @ Chowen Creek Preliminary Plans
Task 1: Project Management
Task 2: Surveys
Task 3: Roadway Design
Task 4: Drainage Design
Task 5: Environmental
Task 6: Utility Design
7. OTHER PERTINENT INFORMATION OR SPECIAL CONSIDERATIONS:
This task order is issued pursuant to the Scope and Fee Proposal dated September 3, 2026 and attached.
8. PAYMENT TYPE:
Contractor will be paid on a percentage complete basis with the submission of monthly invoices
9. LIQUIDATED DAMAGES
N\A
10. NUMBER OF DAYS/MONTHS
TO COMPLETE PROJECT
3 Months after issuance of Notice to
Proceed. No work shall begin prior to
issuance of Notice to Proceed
11. TOTAL AWARD AMOUNT:
$193,300.00
12. Project Manager’s Name Bryan Bauer
Project Manager’s Email frederick.bauer@bcgov.net
Project Manager’s Phone 843-255-2706
Docusign Envelope ID: 0AEF5F96-6FDC-89E2-80E4-D8C2C9FD99B2
Page 89 of 332
Page 2 of 2
12. AUTHORIZED SIGNATURE FOR THE VENDOR:
a. SIGNATURE:
b. NAME/TITLE OF SIGNER:
c. DATE SIGNED:
13. AUTHORIZED SIGNATURE FOR THE COUNTY
a. SIGNATURE
b. NAME/TITLE OF SIGNER
c. DATE SIGNED
Docusign Envelope ID: 0AEF5F96-6FDC-89E2-80E4-D8C2C9FD99B2
9/4/2026
Jennifer G. Mustar Vice President
Page 90 of 332
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
OMNIA CONTRACT AWARD FOR ST. HELENA ISLAND LIBRARY LED RETROFIT ($200,000).
MEETING NAME AND DATE:
County Council October 12, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends the approval of the Omnia contract for Graybar Electric in the amount of $200,000.
PRESENTER INFORMATION:
Ron Lewis, Senior Project Manager, 5 min.
ITEM BACKGROUND:
The interior lighting system at St. Helena Library is very complex and in need of repair; the parts are obsolete
and no longer available. Completing an LED lighting retrofit is the only solution available to restore the
interior lighting to working condition. Two local and one national vendors declined to provide a proposal due
to the complexity of the project. We were able to secure one proposal with Graybar through an Omnia based
contract.
FISCAL IMPACT:
The contract amount is $189,000, staff recommends $11,000 for contingency; bringing the total cost to
$200,000. The funding source will be the 2025 GL Bond GL account # 4013-80-1310-54420 which has the
account balance of $100,000; and Repairs to Buildings GL account # 1000-30-1310-51130 which has the
account balance of $3,000,000.
APPROVAL HISTORY:
N/A
Page 91 of 332
Omnia Contract
Qty
Type
Mfg
Model Number & Notes
Lead Time
1
INCLUDED
RETROFIT/UPGRADE
LIGHTING FIXTURES.
(INTERIOR). MATERI
ALS/LABOR/EQUIPM
ENT DISPOSAL
-
-
-
Omnia Contract Subtotal
$189,000.00
Grand Total
$189,000.00
Project Notes:
Note: this will be performed utilizing the Omnia Contract
Graybar to co-ordinate project upon award.
Dominion Rebate to be provided through Graybar and 100 % of rebate to be paid to Beaufort County .
Job Name :
St. Helena Library lighting Upfit
Quote Number :
485114-969412-1
Bid Date :
May 28, 2026
Expiration Date :
Jun 27, 2026
Quote Start
1
Page 92 of 332
General Terms & Conditions
Graybar Standard Terms and Conditions Apply. https://www.graybar.com/standard-terms-and-
conditions
Job Name :
St. Helena Library lighting Upfit
Quote Number :
485114-969412-1
Bid Date :
May 28, 2026
Expiration Date :
Jun 27, 2026
Quote Start
2
Page 93 of 332
Page 94 of 332
Page 95 of 332
Page 96 of 332
Page 97 of 332
Page 98 of 332
Page 99 of 332
Page 100 of 332
Page 101 of 332
Page 102 of 332
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
RECOMMENDATION FOR APPROVAL OF A CHANGE ORDER WITH KIMLEY HORN FOR A PHASE 2
ENVIRONMENTAL SITE ASSESSMENT (ESA) ON THE LADYS ISLAND DRIVE TURN LANE AT RIBAUT ROAD
PROJECT ($42,350)
MEETING NAME AND DATE:
County Council October 12, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommend approval of a change order with Kimley Horn for a Phase 2 ESA on the Ladys Island Drive at
Ribaut Road project. ($42,350)
PRESENTER INFORMATION:
Bryan Bauer, Director of Engineering (5 Min)
ITEM BACKGROUND:
The task order with Kimley Horn for design services of a right turn lane on Ladys Island Drive to Ribaut Road
requires right of way from the adjacent property where a gas station was previously operated. The Phase 1
Environmental Site Assessment found that contamination is likely, which requires a Phase 2 ESA to determine
the extent of the contamination and potential mitigation.
FISCAL IMPACT:
The change order for the Phase 2 ESA is $38,500. Staff recommends a 10% contingency of $3,850, bringing
the total approved budget increase to $42,350. Funding for this task order will be from Impact Fees North
account 2300-30-0000-54500-12303 with a balance of $4,900,000.00.
APPROVAL HISTORY:
The task order with Kimley Horn for design services of a turn lane on Ladys Island Drive at Ribaut was
approved by PFC on March 16, 2026.
Page 103 of 332
Page 5
kimley-horn.com 1080 Morrison Drive, Suite 240, Charleston, SC 29403 843-737-6390
access to all areas of the site and that the site reconnaissance shall be conducted as a single event.
Should an additional site reconnaissance be required due to access limitations, the additional site
reconnaissance shall be considered additional services.
We assume one day to complete the reconnaissance of the Subject Property.
Interviews
Consistent with ASTM E 1527-21, 10.5.2.3 and 10.5.4, Kimley-Horn will make a reasonable attempt
to conduct the following interviews:
1. Kimley-Horn will attempt to interview current and past owners, operators and occupants of
the property that have or are likely to have material information regarding uses, physical
characteristics, and the potential for recognized environmental conditions (RECs) at the
subject property consistent with ASTM E 1527-21 sections 10.5.1, 10.5.2, 10.5.2.1, 10.5.2.2,
and 10.5.4.
2. In the case of abandoned properties as defined in ASTM E 1527-21, 3.2.1, where there is
evidence of uncontrolled access or unauthorized uses, Kimley-Horn will attempt to interview
current neighboring or nearby property owners (ASTM E 1527-21, 10.5.5).
3. Kimley-Horn will attempt to interview one or more of the following state or local agencies:
a. Local fire department
b. Local health agency
c. Local environmental regulatory agency
Report Preparation
Upon completion of the tasks, Kimley-Horn will prepare a summary report of the results of the Phase I
ESA. Kimley-Horn will provide the report to the Client in electronic format (PDF). Kimley-Horn will
prepare a separate cover letter to accompany the Phase I ESA Report. The cover letter will include
recommendations based on the findings of the Phase I ESA.
Task 8 – Phase II Environmental Site Assessment (If Required)
The Subject Property has historically been used as a fuel station. As such, we assume that a Phase I
ESA may reveal evidence of recognized environmental conditions that would warrant completion of a
Phase II ESA to confirm whether localized contamination is present.
The following Phase II ESA scope of services is based on our current knowledge of potential
contamination concerns for the Subject Property. It may be necessary to adjust the scope of services
pending the results of the Phase I ESA. If that is the case, Kimley-Horn will discuss the proposed
changes and corresponding costs with the Client prior to initiating the Phase II ESA.
Soil and Groundwater Sampling
Kimley-Horn will collect representative soil and groundwater samples from the Subject Property to
determine whether historical activities have contributed to localized contamination. We assume up to
Page 104 of 332
Page 6
kimley-horn.com 1080 Morrison Drive, Suite 240, Charleston, SC 29403 843-737-6390
20 soil samples and 5 groundwater samples will be collected from the Site. The actual number of
samples to be collected from the Site will be contingent upon the findings of the Phase I ESA.
We will engage a drilling sub-consultant to install up to 20 soil borings and 5 temporary monitoring
wells to facilitate the soil and groundwater sampling. The soil borings and monitoring wells will be
installed using direct-push technology (DPT). The soil borings will be advanced to a maximum depth
of 12 feet below land surface (bls). Continuous soil samples will be collected from the land surface to
the termination depth at each borehole. The soil samples will be screened on two-foot intervals for the
presence of volatile organic compounds using a photoionization detector (PID). One soil sample will
be retained for laboratory analysis from each soil boring based on the results of the PID screening.
Lithologic logs will be prepared for each soil boring.
The temporary monitoring well will be installed to a maximum depth of 30 feet bls, depending on the
depth at which groundwater is encountered. If groundwater is not encountered within 30 feet of the
land surface, monitoring wells will not be installed on the property. The temporary monitoring wells
will be constructed of 1-inch diameter, schedule 40 PVC casing with 10-feet of machine slotted well
screen. Individual monitoring well construction logs will be prepared for each temporary monitoring
well. Kimley-Horn will use low-flow techniques to collect groundwater samples from each monitoring
well.
Pursuant to state regulations, Kimley-Horn will notify and obtain approval from the South Carolina
Department of Environmental Services (SCDES) to install and sample temporary monitoring wells on
the Subject Property. The Client acknowledges that in accordance with state regulations, Kimley-Horn
will forward copies of the well construction logs and groundwater analytical data to SCDES upon
completion of the Phase II ESA.
All field activities will be performed in general accordance with the SCDES Standard Operating
Procedures (SOP). The northing and easting coordinates and approximate land surface elevation of
the soil borings and temporary groundwater monitoring wells will be surveyed with a handheld GPS
unit.
The soil and groundwater samples collected from the Subject Property will be analyzed for one or
more of the following parameters:
x Arsenic, barium, cadmium, chro mium, lead, mercury, selenium, and silver (8 RCRA Metals) by
EPA Method 6010 and 7000 series
x Volatile organic compounds (VOCs) by EPA Method 8260
x Semi-volatile organic compounds (SVOC) by EPA Method 8270
If the groundwater screening samples are turbid, Kimley-Horn will collect both total and dissolved
metals samples for analysis. The dissolved metals samples will be filtered by the laboratory. The soil
and groundwater samples collected by Kimley-Horn will be analyzed by a laboratory accredited by the
NELAC Institute and certified by the state of South Carolina. Sample analysis is anticipated to be on
the laboratories normal 10 to 14-day turnaround time.
All soil borings and temporary monitoring wells will be abandoned following the completion of the
sampling activities. The soil borings will be abandoned using soil cuttings and bentonite. Similarly, the
Page 105 of 332
Page 7
kimley-horn.com 1080 Morrison Drive, Suite 240, Charleston, SC 29403 843-737-6390
temporary monitoring well casings and screens will be removed from the ground and the
corresponding boreholes will be abandoned with soil cuttings and hydrated bentonite.
Phase II ESA Report
Kimley-Horn will prepare a Phase II ESA Report upon receipt of the soil and groundwater analytical
data from the laboratory. The purpose of the Phase II ESA is to determine whether the historical use
of the Subject Property have contributed to localized soil or groundwater impacts. As such, the report
is not intended to delineate the full extent of contamination, if present. The report will include a
summary and interpretation of the analytical data. The Phase II ESA report will include the following:
x Written narrative of the sampling methodology
x Summary of the data quality objectives
x Tabular summaries of the soil and analytical data
x An interpretation of the analytical data
x Maps depicting the sample locations and analytical data
x Soil boring logs
x Monitoring well construction logs
x Laboratory data sheets
The Phase II ESA report will include our recommendations based on the results of the soil and
groundwater quality data. We will provide the client with one copy of the report in electronic (PDF)
format.
Task 9 – Meetings and Coordination
Kimley-Horn will coordinate, facilitate, and document up to four (4) meetings with Beaufort County
Staff. The meetings are assumed to be in person at Beaufort County offices and consist of two (2)
Kimley-Horn personnel.
Task 10 – Survey and Subsurface Utility Exploration (SUE) – By Others
At the direction of the Client, Kimley-Horn will contract with Atlas to provide survey and SUE
coordination services. Kimley-Horn will coordinate and manage the effort of the survey and SUE
subconsultant(s) as described in the attached proposals provided by the subconsultant(s). Kimley-
Horn will endeavor to coordinate the subconsultants’ scope of work, schedules, and provide a cursory
review of their deliverables on behalf of the Client.
The Client/Owner acknowledges that Kimley-Horn will not be reviewing the work product of
Subconsultant(s) in detail and will not be liable for it in any way. If the Client has any future claim
related to these services, Client will pursue Subconsultant directly and not Kimley-Horn.
Task 11 – Utility Coordination – By Others
At the direction of the Client, Kimley-Horn will contract with Triton Utility Coordinating to provide utility
coordination services. Kimley-Horn will coordinate and manage the effort of the utility coordination
subconsultant(s) as described in the attached proposals provided by the subconsultant(s). Kimley-
Page 106 of 332
Page 9
kimley-horn.com 1080 Morrison Drive, Suite 240, Charleston, SC 29403 843-737-6390
FEE AND BILLING
Kimley-Horn will perform the services listed above for the fee below. All permitting, application, and
similar project fees will be paid directly by the Client.
Task Fee Type Fee
Task 1 – Capacity Analysis Lump Sum $5,525
Task 2 – Roadway Design Lump Sum $25,985
Task 3 – Drainage Design and Report Lump Sum $18,525
Task 4 – Signal Design Lump Sum $11,675
Task 5 – Permitting Lump Sum $18,275
Task 6 – Opinion of Probable Construction Cost (OPCC) Lump Sum $3,335
Task 7 – Phase 1 ESA Lump Sum $5,620
Phase 1 ESA Expenses Lump Sum $6,500
Task 8 – Phase 2 ESA (If Required) Lump Sum $13,500
Allowance for Phase II ESA Drilling and Laboratory
Subcontractor Expense
Lump Sum $25,000*
Task 9 – Meetings and Coordination Lump Sum $7,175
Task 10 – Survey and SUE - by Others Lump Sum $21,900
KH Survey subconsultant Coordination Lump Sum $3,730
Task 11- Utility Coordination – by others Lump Sum $20,000
KH Utility subconsultant Coordination Lump Sum $2,960
Total Without Task 8 $151,205
Total with Task 8 $189,705
*An allowance has been provided for general budgetary purposes for the laboratory and drilling sub-
consultant expense for the Phase II scope of work. Actual fees will be dependent on the number of
borings needed. Once those have been identified, Kimley-Horn will coordinate with the boring
subconsultant for a proposal for the exact scope of work. Kimley-Horn will then add a 15% markup to
cover administrative efforts. The Client can elect to contract with the boring subconsultant directly for
this scope of work to avoid this markup.
Lump sum fees will be invoiced monthly based upon the overall percentage of services performed.
Payment will be due within 25 days of your receipt of the invoice and should include the invoice
number and Kimley-Horn project number.
CLOSURE
In addition to the matters set forth herein, our Proposal shall include and be subject to, and only to, the
terms and conditions in the attached modified Standard Provisions, which are incorporated by
Page 107 of 332
Phase I Environmental Site Assessment
Lady’s Island Site
Project No. 012716030
5
1.0 EXECUTIVE SUMMARY
Kimley-Horn and Associates, Inc. (Kimley-Horn) was retained by Beaufort County Engineering (the “Client”)
to conduct a Phase I Envi ronmental Site Assessment (ESA) for an approximate 0.6-acre parcel (PIN #
R110 009 000 0031 0000) located within Lady’s Island, Beaufort County, South Carolina (referred to herein
as the “Site” or “Subject Property”). This Phase I ESA was performed in general accordance with (1) the
United States Environmental Protection Agency (USEPA) Standards and Practices for All Appropriate
Inquiries (AAI), 40 CFR Part 312 and (2) guidelines established by the American Society for Testing and
Materials (ASTM) in the Standard Practice for Environmental Site Assessments: Phase I Environmental
Site Assessment Process/Designation E1527-21 (ASTM Standard Practice E1527-21). The ESA was
conducted under the supervision or responsible charge of Mr. Ben Lawson, Environmental Professional.
The Phase I ESA summary is provided below. Specific details were not included or fully developed in this
section, and the Phase I ESA must be reviewed in its entirety for a comprehensive understanding of the
results. This report represents our services as of the report date and constitutes our final document; its text
may not be altered after final issuance. Findings in this report are based upon the Subject Property’s current
utilization; information derived from the most recent reconnaissance and from other activities described
herein; such information is subject to change. Certain indicators of the presence of hazardous substances
or petroleum products may have been latent, inaccessible, unobservable, or not present during the most
recent reconnaissance and may subsequently become observable (such as after property renovation or
development). Further, these services are not to be construed as legal interpretation or advice.
Viability of this report is subject to ASTM E1527-21 Section 4.6. As listed in Section 4.6 of the ASTM
Standard Practice E1527-21, an environmental site assessment meeting or exceeding this practice is
presumed to be viable when it is conducted within 180 days prior to the date of acquisition or transaction
of the Subject Property.
Table 1.0-1 Summary Phase I ESA Component Dates
Component Date
Interviews
User Questionnaire was sent to Mr. Bryan Bauer and Ms. Pamela Bernard with
Beaufort County, on June 9, 2026. Ms. Bernard completed the User
Questionnaire on June 26, 2026
Property Owner Interview Questionnaire was sent to Mr. Bryan Bauer and Ms.
Pamela Bernard with Beaufort County, on June 9, 2026, for coordination with
the current property owner. Ms. Bernard completed the Property Owner
Interview Questionnaire on June 26, 2026.
Review of Government Records May 19, 2026
Visual Inspection May 20, 2026
Declaration by Environmental
Professional July 2, 2026
Subject Property Description and Use
The Subject Property is located in Lady’s Island in Beaufort County, South Carolina. The Site is currently
utilized as a cleared and graded lot.
The approximately 0.6-acre Subject Property is composed of one parcel (PIN#: R110 009 000 0031 0000)
currently owned by Drayton-Parker Companies, LLC. Information was obtained from the Beaufort County
Parcel Search (accessed June 1, 2026) and is attached in Appendix F. However, according to the current
property owner interview, the parcel is owned by Beaufort County. The Subject Property is currently zoned
as T4 - Urban Center under the Town of Porty Royal. The Subject Property is located within the Beaufort,
Page 108 of 332
Phase I Environmental Site Assessment
Lady’s Island Site
Project No. 012716030
6
Parris Island, and Fort Fremont, South Carolina United States Geological Survey (USGS) 2024, 7.5-minute
topographic quadrangle maps presented in Figure 2.
Historical Information
Historical aerial photographs indicate that the Subject Property was established primarily as agricultural
land with a portion of forested land along the western boundary prior to 1951. By 1968, the Site is primarily
composed of forested land. By 1994, a gas station was constructed in the center of the Site with a portion
of forested land along the eastern boundary. No significant changes were observed between 1994 and
2023. According to the Site reconnaissance, between 2023 to present day, the gas station was removed.
Prior to 1951, the Subject Property vicinity was primarily composed of agricultural land, with scattered
single-family homes, commercial buildings, pockets of forested land, marsh land, and the Beaufort River.
Additionally, Ribaut Road, Johnny Morrall Circle, and the Naval Base were established prior to 1951. By
1968, multiple commercial properties were developed to the north, and a multi-family residential
neighborhood was constructed to the west. Between 1968 and 1983, commercial properties continued to
be developed to the north, and all agricultural fields were revegetated in all directions. Additionally, Ladys
Island Drive was constructed to the east, multiple commercial properties were developed to the south, and
multiple single-family homes and commercial properties were developed to the west. By 1994, multiple
docks were constructed along the Beaufort River, and multiple commercial properties were developed to
the east. By 2006, multiple commercial properties were developed to the west. By 2011, multiple
commercial properties were developed to the south. By 2015, Ladys Island Drive expanded to a 4-lane
road. No significant changes were observed between 2015 and 2023.
Records Review
Kimley-Horn reviewed select federal and state environmental regulatory databases, as well as responses
from state and local regulatory agencies. Review of these databases and responses did identify a REC
associated with the Subject Property.
Table 1.0-2 Summary of Record Review Dates
Records
Reviewed Date of Review Results of Review
Historical Aerials May 12, 2026
x No RECs,
HRECs, or
CRECs
x BERs identified
Topographic
Maps
May 11, 2026 x No RECs
City Directories May 12, 2026 x No RECs
Sanborn Fire
Insurance Maps May 11, 2026
No fire insurance maps
are available for the
Subject Property.
Interviews
User Questionnaire was sent to Mr. Bryan Bauer and Ms.
Pamela Bernard with Beaufort County, on June 9, 2026. Ms.
Bernard completed the User Questionnaire on June 26, 2026
Property Owner Interview Questionnaire was sent to Mr.
Bryan Bauer and Ms. Pamela Bernard with Beaufort County,
on June 9, 2026, for coordination with the current property
owner. Ms. Bernard completed the Property Owner Interview
Questionnaire on June 26, 2026.
Government Officials: FOIA request May 19, 2026
x REC identified
Site Recon May 21, 2026 x REC identified
x BERs identified
Page 109 of 332
Phase I Environmental Site Assessment
Lady’s Island Site
Project No. 012716030
7
Site Reconnaissance
On May 21, 2026, Ms. Skylar Cole Kimley-Horn, under the supervision of Mr. Ben Lawson, PWS, qualified
environmental professional, visited the Subject Property. Ms. Cole was not escorted during the completion
of site reconnaissance of the Subject Property. No interior observations were made during the completion
of this Phase I ESA as part of this investigation. A summary of exterior observations from the site
reconnaissance are as follows:
x The Site was observed to be primarily composed of a cleared and graded lot.
x Three monitoring wells were observed within the Site.
x Overhead powerlines and pole-mounted transformers were observed transecting the northern
boundary of the Site. The pole-mounted transformers appeared to be corrosive.
x One closed drum labeled “non-hazardous waste” was observed within the eastern portion of the
Site. The contents inside are unknown, however no leaking, soil staining, or odor was observed.
Kimley-Horn did identify a REC associated with three monitoring wells located within the Subject Property
during the site reconnaissance.
Adjoining Properties
The Subject Property is bordered to the north by a maintained roadway (Johnny Morrall Cir) followed by a
religious facility. The Site is bordered to the west by a maintained roadway (Ribaut Road) followed by
commercial developments. The Site is bordered to the south by a maintained roadway (Ladys Island Dr)
followed by commercial developments. The Site is bordered to the east by commercial developments.
Opinions and Conclusions
Kimley-Horn has performed a Phase I Environmental Site Assessment (ESA) in conformance with the
scope and limitations of ASTM Practice E1527-21 for the approximately 0.6-acre property (PIN# R110 009
000 0031 0000) located within Lady’s Island, Beaufort County, SC, the Subject Property. This assessment
has revealed no controlled recognized environmental conditions or historical recognized environmental
conditions in connection with the Subject Property.
The following Recognized Environmental Conditions (RECs) were identified in association with the
Subject Property:
x During the site reconnaissance, three monitoring wells were observed within the Subject Property.
The monitoring wells appear to be in connection with the remediation of EDR record Piedmont
Petroleum Corp / Happy Mart #33 (Exxon) / Parkers 76 located within the Subject Property. The
Subject Property is listed as a historical gasoline service station with multiple UST leaks and
groundwater contamination. The EDR database search has limited information on the status of the
monitoring wells or the status of the remediation efforts. The Client provided Kimley-Horn with a
prior Limited Phase 2 ESA where further coordination with SCDHEC (now SCDES) was
recommended. Due to the known Site contamination, the unknown status of the morning wells and
remediation effort, and the potential requirement to close and/or relocate the monitoring wells, the
Subject Property is considered a REC.
x EDR record NAVSUPPFAC Beaufort SC/ US Naval Hospital is located approximately 0.046-miles
south of the Subject Property and approximately 0.407-miles southeast of the Subject Property.
The NAVSUPPFAC Beaufort SC/ US Naval Hospital is recorded for multiple UST leaks. Due to the
known contamination and the proximity to the Subject Property, the facility is considered a REC for
the Subject Property.
Page 110 of 332
Phase I Environmental Site Assessment
Lady’s Island Site
Project No. 012716030
8
The following Business Environmental Risks (BERs) were identified in association with the Subject
Property:
x Portions of the Site have been historically utilized for agricultural purposes from prior to 1951 until
prior to 1961. The historical land uses presumably included the legal and common application of
herbicides, fertilizers, and/or pesticides for crop cultivation. The legal application of these
compounds over time can result in localized impacts to the soil and/or groundwater. There was no
evidence observed during the site reconnaissance to indicate that these compounds had been
improperly applied to the Site. Earthwork or soil disturbance associated with future uses may
uncover or expose original soil. Based on historical land use, the potential for agrichemicals to be
present in the soil and groundwater is considered a BER.
x A drum labeled “non-hazardous waste” was observed in the eastern portion of the Site. The drum
appeared to closed and no leaking, soil staining, or odor was observed. However, due to the exact
contents and duration of the material remaining unknown, the drum is considered a BER.
x Evidence of overhead powerlines and associated pole-mounted transformers observed along the
northern boundary of the Site. The utilities may need to be moved or relocated as part of
development within the Site. Additionally, during the site reconnaissance, majority of the pole
mounted transformers appeared to be corrosive and may warrant further investigation. The
overhead powerlines and pole-mounted transformers are considered a BER.
Page 111 of 332
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
2026/43: AN ORDINANCE TO AMEND ORDINANCE 2026/29 TO AUTHORIZE THE TRANSFER OF FUNDS.
THE VOTE AT THE FINANCE, ADMINISTRATION, AND ECONOMIC DEVELOPMENT COMMITTEE ON AUGUST 17,
2026 - 9:0
THE VOTE AT FIRST READING ON SEPTEMBER 14, 2026 - 9:1
THE VOTE AT SECOND READING AND PUBLIC HEARING SEPTEMBER 28, 2026 - 6:4
MEETING NAME AND DATE:
County Council October 12, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Recommend for approval.
PRESENTER INFORMATION:
Mike Moore, County Administrator (10 minutes)
ITEM BACKGROUND:
Language authorizing the transfer of funds was removed from the FY27 Budget Ordinance. This means that no
movement of funds between departments or within the CIP funds can occur without Council approval. There
are currently several CIP projects that are on hold until additional funding can be approved. There are many
projects that are complete with project savings available to provide funding for these projects. Staff have
provided three options that would restore authority to approve budget transfers for the County Administrator
or CFO. The approval of one of these options would allow staff to continue work on these projects.
FISCAL IMPACT:
N/A
APPROVAL HISTORY:
The vote at the Finance, Administration, and Economic Development Committee on August 17, 2026 - 9:0
The vote at First Reading on September 14, 2026 - 9:1
The vote at Second Reading and Public Hearing September 28, 2026 - 6:4
Page 112 of 332
ORDINANCE 2026/
AN ORDINANCE TO AMEND BEAUFORT COUNTY’S BUDGET ORDINANCE FOR
FISCAL YEAR 2027 (ORDINANCE 2026/29) TO AUTHORIZE THE TRANSFER OF
FUNDS.
WHEREAS, the Beaufort County Council (“Council”), pursuant to the authority granted by
the Constitution of the State of South Carolina and the General Assembly of the State of South
Carolina, has the authority to provide for the issuance and sale of general obligation bonds; and
WHEREAS, on June 22, 2026, County Council adopted Ordinance 2026/29, which set the
County’s FY2027 budget and associated expenditures; and
WHEREAS, a motion was made to amend the proposed FY2027 budget ordinance at the
County Council meeting on May 26, 2026, to remove language from section VIII of the ordinance
that would authorize the County Administrator to transfer funds; and
WHEREAS, County Council desires to amend the FY2027 Budget Ordinance 2026/29 to
authorize the County Administrator with the recommendation of the CFO, to transfer appropriations
between departments (from one department to another) and within the County’s General Fund,
Capital Projects Fund, and Capital Improvements Fund, excluding all Enterprise Funds, provided a
single transfer does not exceed $200,000, the transfer does not increase the total overall budget of
the fund, the transfer does not establish a new capital project, and the transfer does not eliminate or
materially change the scope, purpose, or intended outcome of a project; and
NOW, THEREFORE, BE IT ORDAINED BY BEAUFORT COUNTY COUNCIL
that the FY2027 Beaufort County Budget Ordinance 2026/29 is amended to authorize the County
Administrator, when it is in the best interest of the individual County departments or agencies and with the
recommendation of the CFO, to transfer appropriations between departments (from one department to
another). The County Administrator is permitted to transfer appropriations within the County’s General
Fund, Capital Projects Fund, and Capital Improvements Fund, excluding all Enterprise Funds, as long as
it:
a) Does not exceed $200,000 in a single transfer
b) Does not increase the total overall budget of the fund
c) Does not establish a new capital project
d) Does not eliminate or materially change the scope, purpose, or intended outcome of a project
Done this ___ day of ________ 2026.
COUNTY COUNCIL OF BEAUFORT COUNTY
By: ___________________________________
Alice Howard, Chairman
ATTEST:
________________________
Sarah Brock, Clerk to Council
Page 113 of 332
Options:
1. Restore original language:
The County Administrator or the CFO is permitted, when it is in the best interest of the
individual County departments or agencies, to transfer appropriations between departments
(from one department to another department) and between the County’s General Fund,
Capital Projects Fund and Capital Improvements Fund (from one Fund to another Fund) up to
$150,000.
2. Transfers between departments approved upon authorization from the
Administrator/CFO. Transfers within CIP funds conditionally authorized:
The County Administrator or the CFO is permitted, when it is in the best interest of the
individual County departments or agencies, to transfer appropriations between departments
(from one department to another). The County Administrator or the CFO is permitted to
transfer appropriations within the County’s General Fund, Capital Projects Fund, and Capital
Improvements Fund as long as it:
a) Does not exceed $200,000 in a single transfer.
b) Does not increase the total overall budget of the fund.
c) Does not establish a new capital project.
d) Does not eliminate or materially change the scope, purpose, or intended outcome of
a project.
3. Provide full authority for Administrator/CFO to authorize transfers without a
threshold limit:
The County Administrator or the CFO is permitted, when it is in the best interest of the
individual County departments or agencies, to transfer appropriations between
departments (from one department to another department) and between and within the
County’s General Fund, Capital Projects Fund and Capital Improvements Fund.
Page 114 of 332
Summary of Findings:
Administrator/CFO has full
authorization on transfers
with no $ limit
Administrator/CFO has
authorization on transfers
within a defined threshold
Nothing specifically noted in
a budget ordinance
Dorchester County Jasper County Richland County
Charleston County Horry County Lexington County
Greenville County
Colleton County
Aiken County
Dorchester County
• SECTION VII: Each department head is permitted, subject to the County Administrator's
(or his designee's) approval, to transfer appropriation(s) between object classification
codes within that department. Transfers between objects 11-01 through 26-01
(personnel codes) must be approved by the County Administrator or their designee;
transfers from objects 11-01 and 26- 01 to other object codes are not permitted under
any circumstances without the approval of County Council. Transfers from objects 33-03
(autopsies & postmortems), 53-02 (cell phones) and 62-02 (fuel) are not permitted
without the approval of the County Administrator. The County Administrator or CFO is
permitted, when it is in the best interest of the individual County departments or
agencies, to transfer appropriations between departments (from one department to
another department) and between the County's General Fund, Capital Projects Fund,
Special Revenue Funds, and Capital Improvements Fund (from one Fund to another
Fund).
Charleston County
• Overall: Administrator has almost executive authority in transfers
• SECTION 9: Organization units are bound to the appropriated disbursements as defined
in SECTION 2 and delineated in the Fiscal Year 2027 Approved Budget Detail document.
o (a) For contributions, the organizational budgets are bound by “object code.”
o (b) The County Administrator, or his designated representative, is hereby
authorized to effect transfers between organizational units. The County
Administrator is also authorized to further restrict budget transfers within major
expenditure categories.
o (c) County Council may by resolution effect transfers from Council's Contingency
to organizational units.
Page 115 of 332
o (d) County Council may by amendment to this Ordinance adjust appropriation
transactions affecting fund totals, other than those authorized elsewhere within
this Ordinance.
o (e) For personnel costs, the organizational budgets are bound at the total of
personnel costs. Funds cannot be transferred into or out of personnel.
Greenville County
• Administrator has executive authority
• SECTION 4: LINE ITEM ACCOUNTS ESTABLISHED. All line item accounts as set forth in the
FY2027 Budget Proposal, as adjusted and established by the aforementioned
appropriation, are herein established and incorporated as if fully set forth and shall be
expended, transferred, or supplemented pursuant to the Greenville County Code. The
County Administrator is authorized to transfer funds between departments to make
necessary changes and adjustments to reflect Council amendments to the proposed
budget.
Richland County
• Nothing specifically noted in budget ordinance
Jasper County
• Same language as our FY26 ordinance but transfer limit is smaller:
Colleton County
• As long as the overall budget is not increased, Administrator has full authority
• SECTION 9. TRANSFERS VALIDATED All duly authorized transfers of funds heretofore
made from one account to another, or from one fund to another during Fiscal Year
2025-2026, are hereby approved, and the Administrator shall be authorized to
implement and fulfill the same transfer authority in Fiscal Year 2026-2027 so long as the
Page 116 of 332
transfer does not exceed the amount budgeted therefore or violate any restrictions
associated with the expenditure of monies from such fund.
Horry County
• Allowed up to $100,000 which then needs a resolution
• SECTION 36. Any budget transfer from the Capital Improvement Plan (CIP) Inflation or
General Contingency that exceeds $100,000 must first be approved by County Council
through a resolution before the transfer is completed. These resolutions are not
required to first go through a Council Committee.
Lexington County
• Nothing specifically noted in budget ordinance
Aiken County
• Generally allowed with approval from Administrator
• Generally, transfers between object categories are authorized unless restricted herein,
or elsewhere by ordinance or administrative directive. Budget transfers involving the
Personnel Services object categories of a department's budget must be requested in
writing by the supervising department head, and approved in writing by the County
Administrator or his designee. Transfers out of Personnel Services object categories are
prohibited except for pooled payments for health insurance, taxes, worker
compensation, and similar purposes, or personnel position reassignments for efficiency
or emergencies as authorized by the County Administrator. Transfers out of the Road
Maintenance Fund are prohibited, except as approved herein for interest and indirect
cost payments. Departments are authorized to transfer funds within operating accounts
with the approval of the County Administrator or his designee.
Page 117 of 332
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
2026/44: AN ORDINANCE AMENDING THE FY2027 BUDGET FOR STORMWATER UTILITY OPERATIONS,
CARRYOVER PURCHASE ORDERS, ACCOMMODATIONS & HOSPITALITY TAX PROJECTS, AND FACILITY
OPERATIONS.
THE VOTE AT FINANCE, ADMINISTRATION, AND ECONOMIC DEVELOPMENT COMMITTEE MEETING ON
AUGUST 17, 2026 - 9:0
THE VOTE AT FIRST READING ON SEPTEMBER 14, 2026 - 10:0
THE VOTE AT SECOND READING AND PUBLIC HEARING ON SEPTEMBER 28, 2026 - 10:0
MEETING NAME AND DATE:
County Council October 12, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of the budget amendment ordinance to properly recognize the applicable fund
balances and appropriate the funds necessary for the Stormwater Utility operational budget, the identified
carryover Purchase Orders, & Facilities Operations.
PRESENTER INFORMATION:
Sandy Novak, Finance Director, 5 minutes
ITEM BACKGROUND:
The amendment allocates stormwater funds to finance the Royal Pines Drainage Project and address four
ongoing projects for which purchase orders were not correctly entered in the budget process, totaling
$7,247,672.28. The details of the transfers are as follows: (1) $3,475,000 from the Stormwater Utility
Enterprise Fund for the Stormwater Utility operational budget; and (2) $1,916,589.12 from A-Tax to fund 2
carryover Purchase Orders that were planned in the prior fiscal year but not adequately budgeted in
FY2027($642,489.12), support for the Waterfront Park project ($1,000,000), and 15% of A-Tax for to support
affordable housing ($274,100) (3) $1,000,000 from H-Tax to support the Waterfront Park project (4) $539,900
from Parks & Rec Impact Fees to fund a carryover Purchase Orders that was planned in the prior fiscal year but
not adequately budgeted in FY2027 (5) $62,914.06 in Airport Funds to fund a carryover Purchase Orders that
was planned in the prior fiscal year but not adequately budgeted in FY2027 and (6) $253,269.10 from the
General Fund fund balance for the HVAC replacement at the Animal Shelter.
FISCAL IMPACT:
The amendment increases FY2027 appropriations by $7,247,672.28. The amendment does not rely on a new
tax or fee; the appropriations are funded from existing fund balances in the Stormwater Utility Fund, Local
Accommodations Tax Fund, Parks and Recreation Impact Fee Fund, Hilton Head Island Airport Enterprise Fund
and the General Fund fund balance. Funding breakdown: $3,475,000.00 Stormwater Utility Fund balance;
$1,916,589.12 Local A-Tax fund balance; $1,000,000 H-Tax fund balance; $539,900.00 Parks and Recreation
Page 118 of 332
Impact Fee fund balance; $62,914.06 Hilton Head Island Airport fund balance; and $253,269.10 from General
Fund fund balance.
APPROVAL HISTORY:
The vote at Finance, Administration, and Economic Development Committee Meeting on August 17, 2026 - 9:0
The vote at First Reading on September 14, 2026 - 10:0
The vote at Second Reading and Public Hearing on September 28, 2026 - 10:0
Page 119 of 332
ORDINANCE 2026/____
AN ORDINANCE TO AMEND BEAUFORT COUNTY’S BUDGET ORDINANCE FOR
FISCAL YEAR 2027 (ORDINANCE NO. 2026/29) TO AMEND SECTION III, COUNTY
OPERATIONS REVENUES, AND SECTION IV, COUNTY OPERATIONS
APPROPRIATION TO APPROPRIATE FUND BALANCE FOR STORMWATER
UTILITY OPERATIONS, CERTAIN GENERAL FUND CARRYOVER PURCHASE
ORDERS, AND FACILITY OPERATIONS
WHEREAS, the Beaufort County Council, pursuant to the authority granted by the
Constitution of the State of South Carolina and the General Assembly of the State of South
Carolina, has the authority to prepare an annual budget for all Beaufort County Departments,
Agencies, Elected Officials, Boards and Commissions; and
WHEREAS, Beaufort County Council adopted Ordinance 2026/29 on June 22, 2025,
which set the County’s FY2027 budget and associated expenditures; and
WHEREAS, the County has identified a need to appropriate $3,475,000 from the
Stormwater Utility Fund balance, an Enterprise Fund, to the Stormwater Utility operational budget
for FY2027; and
WHEREAS, the County has further identified four carryover Purchase Orders for projects
that were planned but were not appropriately budgeted in FY2027 and therefore require an
appropriation from Local 3% Accommodations Tax Special Revenue Fund fund balance, Parks
and Recreation Impact Fees fund balance, and HHI Airport Enterprise Fund fund balance; and
WHEREAS, the required overall appropriations for these carryover Purchase Orders totals
$1,245,303.18 and consists of the projects and amounts identified in Exhibit A attached hereto and
incorporated herein by reference; and
WHEREAS, the County has a need to appropriate $253,269.10 from the General Fund
fund balance to repair a failing HVAC at the Animal Shelter from funds recently received via a
recent settlement involving the impaired equipment; and
WHEREAS, the City of Beaufort has requested Local 3% Accommodations and
Hospitality Tax for a project on at the Waterfront Park and the County desires to provide
$1,000,000 of A-Tax funding and $1,000,000 of H-Tax funding for the project; and
WHEREAS, The County desires to use 15% of Local 3% Accommodations Tax for
Affordable Workforce Housing in the amount of $274,100; and
WHEREAS, the combined impact of this budget amendment is to increase FY2027
appropriations by $7,247,672.28, consisting of $3,475,000 from Stormwater Utility Fund balance
$1,916,589.12 from Local 3% Accommodations Tax fund balance, $1,000,000 from H-Tax fund
balance, $539,900 from Parks and Recreation Impact Fund, $62,914.06 from Airports, and
$253,269.10 from General Fund fund balance; and
WHEREAS, in the interest of good accounting practices and transparency in the budget
process, it is beneficial and necessary to amend the budget to reflect the changes as set forth herein.
Page 120 of 332
NOW, THEREFORE, BE IT ORDAINED BY BEAUFORT COUNTY COUNCIL
that the FY2027 Beaufort County Budget Ordinance 2026/29 is hereby amended as
follows:
SECTION III. COUNTY OPERATIONS REVENUES
A. Stormwater Utility Fund. The Stormwater Utility Fund, an Enterprise Fund, is amended
to recognize and appropriate $3,475,000 from Stormwater Utility Fund balance for the
Stormwater Utility operational budget.
B. Local 3% Accommodation Tax. Local 3% Accommodations Tax revenues are amended
to recognize and appropriate $642,489.12 from fund balance to support carryover Purchase
Orders identified in “Exhibit A”, $1,000,000 from fund balance to support the Waterfront
Park project, and $274,100 from fund balance to support workforce housing for a total of
$1,916,589.12.
C. Local Hospitality Tax. H-Tax fund budget is amended to recognize and appropriate
$1,000,000 for the Waterfront Park project from fund balance.
D. Parks and Recreation Impact fees. Impact fees revenues are amended to recognize and
appropriate $539,900 from fund balance to support carryover Purchase Orders identified
in “Exhibit A”.
E. Airports Fund. Airport revenues are amended to recognize and appropriate $62,914.06
from Airports fund balance to support carryover Purchase Orders identified in “Exhibit A”.
F. General Fund Fund Balance. General fund fund balance is amended to reorganize and
appropriate $253,269.10 to support the HVAC replacement at the Animal Shelter facility.
The details of line-item accounts for these funds are hereby adopted as part of this Ordinance.
SECTION IV. COUNTY OPERATIONS APPROPRIATION
A. Stormwater Utility Fund (Fund 5025). The Stormwater Utility operational
appropriation is increased by $3,475,000, funded from Stormwater Utility Fund balance.
B. Local 3% Accommodation Tax Fund (Fund 2001) is increased by $1,916,589.12 from
fund balance.
C. Local Hospitality Tax (Fund 2002) is increased by $1,000,000 from fund balance.
D. Parks and Recreation Impact fees (Fund 2650) are increased by $539,900 from fund
balance.
E. Airports (Fund 5102) is increased by $62,914.06 from fund balance.
F. Facilities Operations (Fund 1000) is increased by $253,269.10 from General Fund fund
balance.
Page 121 of 332
EXHIBIT A
FY2026 CARRYOVER PURCHASE ORDERS
Project Funding Source Purchase Order
# Amount
Alljoy Boat Landing Local 3% A-Tax 270328 $397,989.12
Broad River Fishing Pier Local 3% A-Tax 270333 $244,500.00
BRACE Project Lighting P&R Impact Fees 270308 $539,900.00
SCAC Grant HHI Airport $62,914.06
Total Appropriations $1,245,303.18
Done this ___ day of __________ 2026.
COUNTY COUNCIL OF BEAUFORT COUNTY
By: ___________________________________
Alice Howard, Chairman
ATTEST:
________________________
Sarah Brock, Clerk to Council
First Reading:
Public Reading:
Second Reading:
Third Reading:
Page 122 of 332
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
2026/45: AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE NECESSARY
DOCUMENTS AND PROVIDE FUNDING FOR THE PURCHASE OF REAL PROPERTY IDENTIFIED AS TMS NOS. R200-
010-000-0340-0000, R200-010-000-021G-0000, AND R200-010-000-0446-0000 FROM BRICKYARD COMMONS,
LLC FOR THE ROYAL PINES STORMWATER PROJECT IN THE AMOUNT OF $3,475,000.
THE VOTE AT THE FINANCE, ADMINISTRATION, AND ECONOMIC DEVELOPMENT COMMITTEE MEETING ON
AUGUST 17, 2026 - 9:0
THE VOTE AT FIRST READING ON SEPTEMBER 14, 2026 - 10:0
THE VOTE AT SECOND READING AND PUBLIC HEARING ON SEPTEMBER 28, 2026 - 10:0
MEETING NAME AND DATE:
County Council October 12, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends that an ordinance authorizing the County Administrator to execute the necessary
documents and provide funding for the purchase of the three identified parcels and the associated fixed-price
project agreement with Brickyard Commons, LLC, subject to final legal, procurement, risk, title, environmental,
and funding review.
PRESENTER INFORMATION:
Jared Fralix, Assistant County Administrator
ITEM BACKGROUND:
Beaufort County has identified the southern Royal Pines area as an area of known drainage concern, and the
area was evaluated as part of the Northern Lady's Island Drainage Study completed in May 2024. Last fall, a
developer, Brickyard Commons, LLC, approached the County with an unsolicited public-private stormwater
concept for this area.
An earlier Royal Pines Stormwater Project concept involved a larger and more complex project footprint. After
further discussions and County review, the developer submitted a revised fixed-price proposal limited to three
parcels currently owned by Brickyard Commons, LLC, totaling approximately 25 acres east of Middle Road. The
revised proposal is intended to provide a smaller, more achievable stormwater opportunity while preventing
the site from advancing as a potential 75-unit residential development.
FISCAL IMPACT:
The proposed fixed contract price is $3,475,000, inclusive of the land, design, and permitting work, and the
defined construction scope. Funding is anticipated from the Stormwater Utility Fund 5025-90-9020-54500
APPROVAL HISTORY:
The vote at the Finance, Administration, and Economic Development Committee meeting on 8/17/2026 - 9:0
Page 123 of 332
The vote at First Reading on September 14, 2026 - 10:0
The vote at Second Reading and Public Hearing on September 28, 2026 - 10:0
Page 124 of 332
ORDINANCE 2026/_____
AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE
NECESSARY DOCUMENTS AND PROVIDE FUNDING FOR THE PURCHASE OF REAL
PROPERTY CONSISTING OF APPROXIMATELY TWENTY-FIVE (25) ACRES IN THE
ROYAL PINES AREA OF LADY'S ISLAND, IDENTIFIED AS TMS NOS. R200-010-000-0340-
0000, R200-010-000-021G-0000, AND R200-010-000-0446-0000, FOR THE ROYAL PINES
MARSH COURSE STORMWATER PROJECT - PHASE 1
WHEREAS, Beaufort County Council and Beaufort County ("County") is a body politic and
political subdivision of the State of South Carolina; and
WHEREAS, under SC Code Ann. Sections 4-9-25 and 4-9-30, the County is empowered to act in
the interests of public safety and in matters involving the health and welfare of its citizens, and may acquire
real property; and
WHEREAS, the County has identified drainage and flooding concerns affecting the southern
Royal Pines area of Lady's Island, and the area is included within the 2024 Lady's Island Drainage Study,
which identifies multiple problematic drainage zones surrounding the proposed project site; and
WHEREAS, Brickyard Commons, LLC ("Seller" or "Developer") owns three (3) parcels of real
property identified as TMS Nos. R200-010-000-0340-0000, R200-010-000-021G-0000, and R200-010-
000-0446-0000, consisting of approximately twenty-five (25) acres, hereinafter referred to collectively as
the "Property" or "Project Site"; and
WHEREAS, the County desires to acquire the Property for the Royal Pines Stormwater Project -
a best management practice regional stormwater retention facility intended to provide public stormwater
benefit to the surrounding community; and
WHEREAS, acquisition of the Property will dedicate the Project Site to public stormwater
retention purposes and will prevent the Property from being advanced as a potential seventy-five (75) unit
residential duplex development that could further affect drainage conditions in the surrounding area; and
WHEREAS, the County and Developer have negotiated a proposed Fixed-Price Project
Agreement under which Developer would convey the Property to the County and perform the defined
design, permitting, and construction obligations for Phase 1 of the Royal Pines Stormwater Project; and
WHEREAS, the proposed fixed contract price is Three Million Four Hundred Seventy-Five
Thousand Dollars ($3,475,000.00), which is inclusive of conveyance of the Property, design and permitting
work, and the defined construction scope, subject to the final terms and conditions of the Fixed-Price Project
Agreement; and
WHEREAS, under the proposed agreement, Developer would convey fee simple title to the
Property to the County upon execution of the agreement and payment of the first installment, subject to
temporary retained mineral and excavation rights during construction that must be relinquished to the
County upon completion as provided in the agreement; and
WHEREAS, the funding for the purchase of the Property and related project obligations will be
from the Stormwater Utility (Fund 5025) – Infrastructure, line item 5025-90-9020-54500; and
Page 125 of 332
WHEREAS, Beaufort County Council finds that it is in the best interest of the citizens and
residents of Beaufort County to purchase the Property for the reasons stated above.
NOW, THEREFORE, BE IT ORDAINED by Beaufort County Council, duly assembled, that
the County Administrator is authorized to execute the necessary documents to purchase and fund the
purchase of the real property identified as TMS Nos. R200-010-000-0340-0000, R200-010-000-021G-
0000, and R200-010-000-0446-0000, and to execute the related Fixed-Price Project Agreement and
associated closing, conveyance, funding, and project documents for the Royal Pines Stormwater Project,
subject to review and approval as to form by the County Attorney and subject to available and lawfully
appropriated funds.
Done this ___ day of __________ 2026.
COUNTY COUNCIL OF BEAUFORT COUNTY
By: ___________________________________
Alice Howard, Chairman
ATTEST:
________________________
Sarah Brock, Clerk to Council
First Reading:
Public Reading:
Second Reading:
Third Reading:
Page 126 of 332
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
2026/46: AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR OR NEGOTIATING AUTHORITY IN
ACCORDANCE WITH RESOLUTIONS 2019/44 AND 2021/20 TO EXECUTE ANY AND ALL NECESSARY DOCUMENTS
FOR THE ACCEPTANCE OF RIGHT OF WAY AND/OR TEMPORARY CONSTRUCTION EASEMENT PROPERTIES AS
SHOWN ON EXHIBIT A PAGES 1-4 ASSOCIATED WITH THE SIDEWALKS AND MULTI-USE PATHWAYS – SAFE
ROUTES TO SCHOOLS AND EXHIBIT A PAGES 5-8 ASSOCIATED WITH THE LADY’S ISLAND CORRIDOR TRAFFIC
IMPROVEMENTS.
THE VOTE AT THE PUBLIC FACILITIES COMMITTEE MEETING ON AUGUST 17, 2026 - 9:0
THE VOTE AT FIRST READING ON SEPTEMBER 14, 2026 - 10:0
THE VOTE AT SECOND READING AND PUBLIC HEARING ON SEPTEMBER 28, 2026 - 10:0
MEETING NAME AND DATE:
County Council October 12, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Approval to formalize Right of Way interests for the parcels shown on EXHIBIT A Pages 1-4 associated with the
Sidewalks and Multi-use Pathways – Safe Routes to Schools and EXHIBIT A Pages 5-8 associated with the
Lady’s Island Corridor Traffic Improvements
PRESENTER INFORMATION:
Bryan Bauer PE, ENV SP, Director of Engineering
(5 Minutes)
ITEM BACKGROUND:
Per Resolution 2019/44 for the 2018 One Percent (1%) Transportation Sales and Use Tax which states “County
Council authorizes the acquisition of all rights-of-way needed by way of negotiations by agents or
administrators of Beaufort County and/or by way of eminent domain of such rights-of-way to complete the
projects” which includes the Sidewalks and Multi-use Pathways – Safe Routes to School and Lady’s Island
Corridor Traffic Improvements, and “all acquisitions of such rights-of-way will conform to the standards
approved by Beaufort County, South Carolina Department of Transportation, and the Federal Highway
Administration”. EXHIBIT A Pages 1-4 document the Tracts requiring new right of way and/or temporary
construction easement for the Sidewalks and Multi-use Pathways – Safe Routes to Schools and EXHIBIT A
Pages 5-8 for the Lady’s Island Corridor Traffic Improvements. Beaufort County and its agent are acquiring the
rights-of-way and/or temporary construction easements for the project by appraisal recommending the ‘just
compensation’ value as approved by Beaufort County and SCDOT in accordance with the Intergovernmental
Agreement. The Beaufort County approval/negotiating process is following Resolution 2021/20 for the ‘just
compensation’ value to the property owner and/or eminent domain proceedings.
FISCAL IMPACT:
Funded by the 2018 One Percent Transportation Sales and Use Tax Account # 4705-80-0000-54500-PTHWY
Page 127 of 332
Current balance is $13,148,493.49
APPROVAL HISTORY:
The vote at the Public Facilities Committee Meeting on August 17, 2026 - 9:0
The vote at First Reading on September 14, 2026 - 10:0
The vote at Second Reading and Public Hearing on September 28, 2026 - 10:0
Page 128 of 332
Page I of2
ORDINANCE NO. 2026/
AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR OR
NEGOTIATING AUTHORITY TO EXECUTE ANY AND ALL NECESSARY
DOCUMENTS FOR THE ACCEPTANCE OF RIGHT OF WAY AND/OR TEMPORARY
CONSTRUCTION EASEMENT PROPERTIES AS SHOWN ON EXHIBIT A PAGES 1–4
ASSOCIATED WITH THE SIDEWALKS AND MULTI-USE PATHWAYS – SAFE
ROUTES TO SCHOOLS AND EXHIBIT A PAGES 5–8 ASSOCIATED WITH THE
LADY'S ISLAND CORRIDOR TRAFFIC IMPROVEMENTS
WHEREAS, Beaufort County Council approved Resolution 2019/44 for
the 2018 One Percent (1%) Transportation Sales and Use Tax that authorizes the
acquisition of all right-of-ways needed by way of negotiations conducted by
agents or administrators of Beaufort County and/ or by way of eminent domain
of such right-of-ways needed to complete the projects which includes:
1. Sidewalks and Multi-use Pathways – Safe Routes to School
a. Broad River Boulevard and Riley Road
b. Broad River Drive
c. Salem Road
2. Lady’s Island Corridor Traffic Improvements
a. Airport Frontage Road Phase 2
b. Hazel Farm Road/Gay Drive
c. US 21 Widening near Walmart
WHEREAS, Beaufort County Council approved Resolution 2021/20, a
Resolution establishing right of way ac quisition policies associated with the
implementation of 2018 One Cent Sales Tax Referendum Projects approved by
voters November 6, 2018; and
WHEREAS, Beaufort County and its agents are acquiring the right of
ways and/or temporary construction easem ents to the standards approved by
Beaufort County, South Carolina Department of Transportation, and the Federal
Highway Administration.; and
WHEREAS, Beaufort County and its agents are acquiring the right of
ways and/or temporary construction easem ents for the properties as shown on
Exhibit A Pages 1-4 for the Sidewalks and Multi-use Pathways – Safe Routes to
School projects and Exhibit A Pages 5-8 for the Lady’s Island Corridor Traffic
Improvements projects by appraisal recommending the ‘just compensation’
value as approved by Beaufort County and SCDOT in accordance with the
Intergovernmental Agreement; and
Page 129 of 332
Page I of2
WHEREAS, Beaufort County approval/negotiating process is following
Resolution 2021/20 for the ‘just compensa tion’ value to the property owner
and/or eminent domain proceedings; and
WHEREAS, the right of way and/or te mporary construction easement
properties for the Sidewalks and Multi-use Pathways – Safe Routes to School
projects and Lady’s Island Corridor Traffic Improvements projects are funded by
the 2018 One Percent Transportation Sales and Use Tax; and
WHEREAS, Beaufort County Council believe s that it is in the best
interest of its citizens to formalize the County’s Right of Way interest in the
properties on Exhibit A Pages 1-4 for th e Sidewalks and Multi-use Pathways –
Safe Routes to School projects and E xhibit A Pages 5-8 for the Lady’s Island
Corridor Traffic Improvements projects in Beaufort County.
NOW, THEREFORE, BE IT ORDAINED that Beaufort County
Council hereby authorizes the County Ad ministrator to execute any and all
necessary documents for the acceptance of Right of Way properties on Exhibit A
Pages 1-4 for the Sidewalks and Multi-use Pathways – Safe Routes to School
projects and Exhibit A Pages 5-8 fo r the Lady’s Island Corridor Traffic
Improvements projects in Beaufort County.
ADOPTED this _____ day of _______, 2026.
COUNTY COUNCIL OF BEAUFORT COUNTY
By: ______________________________________
Alice Howard, Chairwoman
ATTEST:
___________________________
Sarah W. Brock, Clerk to Council
Third and Final Reading:
Public Hearing:
Second Reading:
First Reading:
Page 130 of 332
&9)*#*5"
1"(&
Page 131 of 332
"3 $"()&-)$"3
()3
3
&$3 &/&3 & /3 (
3
"$)3 *$3 (!3
120
"()&-)$"3
()3
3
&$3 &/&3
&/3 (
3
.%'+3 %.#,3
&9)*#*5"
1"(&
Page 132 of 332
&9)*#*5"
1"(&
Page 133 of 332
&9)*#*5"
1"(&
Page 134 of 332
&9)*#*5"
1"(&
Page 135 of 332
&9)*#*5"
1"(&
Page 136 of 332
&9)*#*5"
1"(&
Page 137 of 332
&9)*#*5"
1"(&
Page 138 of 332
Page 139 of 332
Page 140 of 332
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
2026/47: AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE AN ELECTRIC LINE
EASEMENT WITH DOMINION ENERGY ON THE PROPERTY KNOWN AS POCOTALIGO PRESERVE (TMS R710 012
000 0001 0000 AND R710 012 000 0072 0000).
THE VOTE AT NATURAL RESOURCES COMMITTEE ON SEPTEMBER 8, 2026 - 7:0
THE VOTE AT FIRST READING ON SEPTEMBER 28, 2026 - 10:0
MEETING NAME AND DATE:
County Council October 12, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval. If the Natural Resources Committee recommends approval, then move forward
with three ordinance readings and a public hearing at County Council.
PRESENTER INFORMATION:
Dylan Kidd, Interim Assistant County Administrator, 5 minutes
ITEM BACKGROUND:
Beaufort County owns in fee-simple the property known as Pocotaligo Preserve located at 30 Cotton Hall Road
in Yemassee, SC. Dominion Energy owns an overhead electric line that runs through various open fields on the
property, which is negatively impacted by County-initiated land management activities. Due to the length of
time the original easement agreement was executed by prior property owners, and the desire by both the
County and Dominion to relocate the electric line to a more suitable location along the property access road,
the execution of a new easement agreement is recommended.
FISCAL IMPACT:
There is no fiscal impact. Dominion will fully fund the relocation of the electrical line.
APPROVAL HISTORY:
The vote at Natural Resources Committee on September 8, 2026 - 7:0
The vote at First Reading on September 28, 2026 - 10:0
Page 141 of 332
ORDINANCE 2026/____
AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE
AN ELECTRIC LINE EASEMENT WITH DOMINION ENERGY ON THE PROPERTY
KNOWN AS POCOTALIGO PRESERVE (TMS R710 012 000 0001 0000 and R710 012
000 0072 0000)
WHEREAS, Beaufort County (“County”) owns in fee-simple the property known as Pocotaligo
Preserve (“Property”) with TMS numbers R710 012 000 0001 0000 and R710 012 000 0072
0000; and
WHEREAS, Dominion Energy (“Dominion”) owns an overhead electric line currently
traversing through multiple open fields on the Property; and
WHEREAS, the County and Dominion desire to formalize the use of the Property with an
electric line easement and relocate the electric line from its current location to a more suitable
location along the Property access road.
NOW, THEREFORE be it ordained that Beaufort County Council duly assembled, does hereby
authorize the County Administrator to execute an electric line easement with Dominion Energy
on the property known as Pocotaligo Preserve (TMS R710 012 000 0001 0000 and R710 012
000 0072 0000).
ORDAINED this ____ day of ____________, 2026
COUNTY COUNCIL OF BEAUFORT COUNTY
BY: ___________________________________
Alice Howard, Chairman
ATTEST:
___________________________
Sarah W. Brock, JD, Clerk to Council
Page 142 of 332
RW-4-E-SC (Rev. 4-2019)
Easement # 908057
INDENTURE, made this _________ day of ____________________, 2026 by and between Beaufort County of the State of South
Carolina, hereinafter called “Grantor” (whether singular or plural), and the DOMINION ENERGY SOUTH CAROLINA, INC., a
South Carolina corporation, having its principal office in Cayce, South Carolina, hereinafter called “Grantee”.
WITNESSETH:
That, in consideration of the sum of One Dollar ($1.00) received from Grantee, Grantor, being the owner of land situate in th e
County of Beaufort, State of South Carolina, hereby grants and conveys to Grantee, its successors and assigns, the right to construct,
extend, replace, relocate, perpetually maintain and operate an overhead or underground electric line or lines consisting of a ny or all of
the following: poles, conductors, lightning protective wires, municipal, public or private communication lines, cables, condu its, pad
mounted transformers, guys, push braces and other accessory apparatus and equipment deemed by Grantee to be necessary or
desirable, upon, over, across, through and under land described as follows: a tract or lot of land containing 527.1700 acres, more or
less, and being the same lands conveyed to Grantor by deed of Open Space Institute Land Trust, Inc., dated or recorded
10/20/2023, and filed in the Register of Deeds office for Beaufort County in Deed book 4284 at Page 1424.
All those certain pieces, parcels, or tracts of land, situate, lying and being in Beaufort County, South Carolina, containing
232.18 Acres known and designated as "Duveaux Hill Parcel A" and 294.99 Acres known and designated as "Parcel C" and
being more fully described and shown as plat entitled "This Plat is Prepared at the Request of the Tomotley Crew, LLC A
Division of Tax Map #R710 012 000 001 0000, Sheldon Area, Beaufo rt County, South Carolina" on that certain plat recorded
in Plat Book 161 at Page 136.
The easement is for the electric facilities more fully shown on Dominion Energy drawing # 86320 and any revisions made
thereof and is made a part hereof by reference only. This easement supersedes and replaces the previous easement granted by
The Tomotley Crew, LLC recorded October 4, 2022, and recorded in the Beaufort County Register of Deeds in Deed Book
4187 page 263. A signed Dominion Energy drawing by the Grantor will be authorization for the Grantee to install future
facilities within the limits of the property shown on the above-mentioned plat.
TMS: R710 012 000 0001 0000 and R710 012 000 0072 0000
Together with the right from time to time to install on said line such additional lines, apparatus and equipment as Grantee m ay deem
necessary or desirable and the right to remove said line or any part thereof.
Together also with the right (but not the obligation) from time to time to trim, cut or remove trees, underbrush and other ob structions
that are within, over, under or through a strip of land (“Easement Space”) extending Fifteen (15) feet on each side of any pole lines
and Five (5) feet on each side of any underground wires and within, over, under or through a section of land extending Twelve (12)
feet from the door side(s) of any pad mounted transformers, elbow cabinets, switchgears or other devices as th ey are installed;
provided, however, any damage to the property of Grantor (other than that caused by trimming, cutting or removing) caused by
Grantee in maintaining or repairing said lines, shall be borne by Grantee; provided further, however, that Granto rs agree for
themselves, their successors and assigns, not to build or allow any structure to be placed on the premises in such a manner t hat any
part thereof will exist within the applicable above specified Easement Space, and in case such structure is bu ilt, then Grantor, or such
successors and assigns as may be in possession and control of the premises at the time, will promptly remove the same upon de mand
of Grantee herein. Grantor further agrees to maintain minimum ground coverage of thirty six (36) inches and maximum ground
coverage of fifty four (54) inches over all underground primary electric lines. Together also with the right of entry upon said lands
of Grantor for all of the purposes aforesaid.
The words “Grantor” and “Grantee” shall include their heirs, executors, administrators, successors and assigns, as the case m ay be.
IN WITNESS WHEREOF, Grantor has caused this indenture to be duly executed the day and year first above written.
WITNESS:
[SIGNATURES TO FOLLOW
Page 143 of 332
RW-4-E-SC (Rev. 4-2019)
Easement # 908057
Beaufort County
______________________________________________________________ By: ________________________________________________________
1st Witness
______________________________________________________________ ____________________________________________________________
2nd Witness Print Name
___________________________________________________________
Title
ACKNOWLEDGMENT
STATE OF SOUTH CAROLINA )
)
COUNTY OF Beaufort )
The foregoing instrument was acknowledged before me, the undersigned Notary, and I do hereby certify that the within named o f
Beaufort County personally appeared before me this day and that the above named acknowledged the due execution of the foregoing
instrument.
Sworn to before me this ______ day of ____________, 2026
_________________________________
Signature of Notary Public State of SC
My commission expires: ___________
________________________________
Print Name of Notary Public
RIGHT OF WAY GRANT TO
DOMINION ENERGY SOUTH CAROLINA, INC.
Line: COTTON HALL TIE LINE
County: Beaufort
R/W File Number: 29059
Grantor(s): Beaufort County
Return to: DESC C/O Right of Way Dept., 81 May River Road, Bluffton, SC 29910
Page 144 of 332
RW-4-E-SC (Rev. 4-2019)
Page 145 of 332
TRASK PKWY.(US HWY 21)
COTTON HALL RD.
STONEY CREEK CEMETARY RD.
TRASK PKWY.(US HWY 21)
NO DATEBYREVISIONFORDRNSHEET OF SHEETS
TITLEDETAILSCALE:SUB.APPDIST#CKT# DOMINION ENERGY SOUTH CAROLINA, INC.
SCALE:
DEVELOPER'S SIGNATURE BLOCK
3 DAYS BEFORE DIGGINGIN SOUTH CAROLINACALL 811IT'S THE LAWPALMETTO UTILITY PROTECTION SERVICE
EASEMENT NO.FILE NUMBERR/W AGENTRIGHT OF WAY INFORMATION
W.R.#STARTED COMPLETEDCLOSED OUTW.O.#
GAS ENG.-TECH.ELECTRIC ENG.-TECH.COORDINATORBY:BY:BY:
DOMINION ENERGY SOUTH CAROLINA, INC.ELECTRIC DISTRIBUTION SYMBOLS
PRELIMINARY
Page 146 of 332
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
2026/48: AN ORDINANCE AMENDING THE BEAUFORT COUNTY CODE OF ORDINANCES, CHAPTER74 - BUILDING
AND BUILDING REGULATIONS, SECTION 74-64, ADOPTION OF BUILDING CODES (AMENDS CODE OF
ORDINANCES TO ADOPT THE 2024 STATE MANDATED CODE EDITIONS).
THE VOTE AT NATURAL RESOURCES COMMITTEE ON SEPTEMBER 8, 2026 - 7:0
THE VOTE AT FIRST READING ON SEPTEMBER 28, 2026 - 10:0
MEETING NAME AND DATE:
County Council October 12, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval.
Motion to approve/deny — AN ORDINANCE AMENDING THE BEAUFORT COUNTY CODE OF ORDINANCES,
CHAPTER 74 - BUILDING AND BUILDING REGULATIONS, SECTION 74-64, ADOPTION OF BUILDING CODES
(AMENDS CODE OF ORDINANCES TO ADOPT THE 2024 STATE MANDATED CODE EDITIONS)
Move forward to Council for First Reading
PRESENTER INFORMATION:
Michael Brantley, Director Building Services, 5 minutes
ITEM BACKGROUND:
On August 26, 2025, the South Carolina Building Codes Council (the "Council") adopted the latest editions of
the mandatory code and appendices with modifications, as referenced in S.C. Code Ann. §6-9-50 (1976, as
amended), to be enforced by all municipalities and counties in South Carolina. The Council established the
implementation date for local jurisdictions as January 1, 2027. Local adoption of the latest state mandated
code editions is required by state law.
FISCAL IMPACT:
No Fiscal Impact
APPROVAL HISTORY:
The vote at Natural Resources Committee on September 8, 2026 - 7:0
The vote at First Reading on September 28, 2026 - 10:0
Page 147 of 332
'-" South Carolina
N Building Codes
0 Modifications
N Index
Page 148 of 332
Introduction to 2024 Building Codes Modifications Index
On August 26, 2025, the South Carolina Building Codes Council (the “Council”) adopted the latest editions of the
mandatory codes and select appendices with modifications, as referenced in S.C. Code Ann. §6 -9-50 (1976, as
amended), to be enforced by all municipalities and counties in South Carolina. More specifically, t he Council
modified and adopted the building codes listed below for use in the State of South Carolina:
2024 Edition of the International Building Code1
2024 Edition of the International Residential Code2
2024 Edition of the International Fire Code3
2024 Edition of the International Plumbing Code4
2024 Edition of the International Mechanical Code5
2024 Edition of the International Fuel Gas Code6
2023 Edition of the National Electrical Code
The Council established the implementation date for local jurisdictions as January 1, 2027.
The Modifications Index lists all modifications that apply to the mandatory building codes listed above, as well as
any appendices adopted by the Council . The modifications are arranged by the affected code section numbers in
ascending order. Modifications continued from a prior building code cycle were renumbered to coincide with the
2024 building code cycle numbering, and are distinguished by a note and reference to their prior modification
numbers. Strikethrough indicates the language deleted by a modification and an underline indicates language
added.
The latest edition of the permissive codes referenced in S.C. Code Ann. § 6-9-60 (1976, as amended) may be adopted
by municipalities and counties via ordinance, and this local adoption by ordinance must take place before
enforcement can begin. The permissive codes are the latest editions of the International Property Maintenance
Code, International Existing Building Code, International Performance Code, and International Swimming Pool and
Spa Code.
Adoption of the mandatory codes and permissive codes does not include the chapters, sections or provisions
addressing administrative policies or procedures. Administrative policies and procedures are the sole responsibility
of each local jurisdiction. If the governing body of a local jurisdiction desires to use the administrative provisions in
one or more of the adopted codes, it must first adopt the chapters or sections by ordinance. In lieu of adopting the
administrative provisions contained in the adopted codes, the governing body of a local jurisdiction may develop
specific administrative policies and procedures for the operation o f its Building Inspection Department by
ordinance.
The latest edition of ICC/ANSI A117.1, Accessible and Usable Buildings and Facilities, is adopted by statute (S.C.
Code Ann. § 10-5-210 et seq.), and is mandatory for use in all municipalities and counties within the State.
1 As modified, known as the 2024 South Carolina Building Code
2 As modified, known as the 2024 South Carolina Residential Code
3 As modified, known as the 2024 South Carolina Fire Code
4 As modified, known as the 2024 South Carolina Plumbing Code
5 As modified, known as the 2024 South Carolina Mechanical Code
6 As modified, known as the 2024 South Carolina Fuel Gas Code
1
2024 Building Code Modification Index (11/3/2025 V.1)
Page 149 of 332
The South Carolina Legislature has enacted the Energy Standard Act (S.C. Code Ann. § 6-10-10 et seq.), and pursuant
to the Energy Standard Act, the 2009 edition of the Inte rnational Energy Conservation Code has been statutorily
adopted as the energy standard and is mandatory for use in all jurisdictions within the State.
Additional information about the building codes adoption process can be found on the South Carolina Building
Codes Council’s website.
2
2024 Building Code Modification Index (11/3/2025 V.1)
Page 150 of 332
2024 SOUTH CAROLINA BUILDING CODES MODIFICATIONS INDEX
Index # Code Modifications New/Continuation
2024 INTERNATIONAL BUILDING CODE (IBC)
IBC 2024 01 [A] 101.4.7 Existing buildings Continuation
IBC 2024 02 202 Definitions – Vapor retarder, ground contact & Primitive
camp structure
Continuation
IBC 2024 03 303.4 Assembly Group A-3
(IFC 2024 03)
Continuation
IBC 2024 04 312.1 General Continuation
IBC 2024 05 706.1 General Continuation
IBC 2024 06 1010.2.13 Controlled egress doors in Group I-1, I-2 and I-4
(Adult Day Care Occupancy only)
(IFC 2024 16)
Continuation
IBC 2024 07 1016.2 Egress through intervening spaces
(IFC 2024 17)
Continuation
IBC 2024 08 1803.2 Investigation required Continuation
IBC 2024 09 1907.4 Vapor retarder Continuation
IBC 2024 10 2303.2.3 Other means during manufacture Continuation
IBC 2024 11 [P] 2902.1.1 Fixture calculations
(IPC 2024 11)
Continuation
IBC 2024 12 [P] 2902.2 Separate facilities
(IPC 2024 12)
Continuation
IBC 2024 13 Appendix H Signs Continuation
2024 INTERNATIONAL RESIDENTIAL CODE (IRC)
IRC 2024 01 R202 Definitions – Accepted Engineering Practice Continuation
IRC 2024 02 R202 Definitions – Crawl Space Continuation
IRC 2024 03 R202 Definitions – Sleeping Loft New from HBA of SC
IRC 2024 04 R301.2.1 Wind design criteria Continuation
IRC 2024 05 R301.2.2 Seismic provisions New from HBA of SC
IRC 2024 06 R301.2.2.1 Determination of seismic design category Continuation
IRC 2024 07 R302.1 Exterior Walls (adds exception #6) Continuation
IRC 2024 08 R302.1 Exterior Walls (adds exception #7) Continuation
IRC 2024 09 R302.2.7 Meter Location New from HBA of SC
IRC 2024 10 R302.4.1 Through penetrations Continuation
IRC 2024 11 R302.5.1 Opening protection Continuation
IRC 2024 12 R302.13 Fire protection of floors Continuation
IRC 2024 13 R304.1.1 Field treatment Continuation
IRC 2024 14 305.1 Subterranean termite control methods Continuation
IRC 2024 15 R305.4 Foam Plastic Protection Continuation
IRC 2024 16 R305.5 Termite inspection strip Continuation
IRC 2024 17 R309 Automatic Sprinkler Systems Continuation
IRC 2024 03 R310.3 Location New from HBA of SC
IRC 2024 03 R314.1 General New from HBA of SC
3
2024 Building Code Modification Index (11/3/2025 V.1)
Page 151 of 332
Index # Code Modifications New/Continuation
IRC 2024 03 Section R315 Sleeping Lofts New from HBA of SC
IRC 2024 18 R316.3 Story above grade plane Continuation
IRC 2024 19 R318.3.1 Floor elevations at the required egress doors New from HBA of SC
IRC 2024 20 R318.7.5.1 Risers Continuation
IRC 2024 03 R319.1 Emergency escape and rescue opening required New from HBA of SC
IRC 2024 21 R321.1.1 Where required Continuation
IRC 2024 22 R321.2 Window fall protection Continuation
IRC 2024 23 R325.3 Mechanical ventilation Continuation
IRC 2024 24 Figure R327.1 Minimum Fixture Clearances Continuation
IRC 2024 25 R404.1.9.2 Masonry piers supporting floor girders Continuation
IRC 2024 26 R408.3 Unvented crawl space Continuation
IRC 2024 27 R408.3 Unvented crawl space Continuation
IRC 2024 28 R408.4 Access Continuation
IRC 2024 29 R408.8 Under-floor vapor retarder Continuation
IRC 2024 30 R502.12.4 Truss design drawings Continuation
IRC 2024 31 R506.3.3 Vapor retarder Continuation
IRC 2024 32 R606.7 Piers Continuation
IRC 2024 33 R802.10.1 Truss design drawings Continuation
IRC 2024 34 Table R905.1.1(2) Underlayment application New from HBA of SC
IRC 2024 35 R905.2.8.5 Drip Edge Continuation
IRC 2024 36 Chapter 11 Energy Efficiency Continuation
IRC 2024 37 M1411.9.1 Auxiliary and secondary drain systems New from HBA of SC
IRC 2024 38 M1411.12 Insulation of refrigerant piping Continuation
IRC 2024 39 M1411.15 Locking access port caps Continuation
IRC 2024 40 M1502.3 Duct termination Continuation
IRC 2024 41 M1502.4.2 Duct Installation Continuation
IRC 2024 42 M1502.4.6 Duct length Continuation
IRC 2024 43 M1503.6 Makeup air Continuation
IRC 2024 44 M1504.3 Exhaust Openings Continuation
IRC 2024 45 M1601.4.1 Joints, Seams and Connections Continuation
IRC 2024 46 G2415.17.1 (404.17.1) Limitations
(IFGC 2024 03)
New from Omega Flex, Inc.
IRC 2024 47 G2418.2 Design and installation Continuation
IRC 2024 48 P2503.6 Shower liner test Continuation
IRC 2024 49 P2503.6 Shower liner test New from HBA of SC
IRC 2024 50 P2603.2.1 Protection against physical damage Continuation
IRC 2024 51 P2603.5 Freezing Continuation
IRC 2024 52 P2603.5 Freezing Continuation
IRC 2024 53 P2705.1 General Continuation
IRC 2024 54 P2705.1 General New from HBA of SC
IRC 2024 55 P2708.4 Shower control valves Continuation
IRC 2024 56 P2713.3 Bathtub and whirlpool bathtub valves Continuation
4
2024 Building Code Modification Index (11/3/2025 V.1)
Page 152 of 332
Index # Code Modifications New/Continuation
IRC 2024 57 P2903.10.3 Fixture valves and access New from HBA of SC
IRC 2024 58 P2903.11 Hose bibb Continuation
IRC 2024 59 P2904.2.4.2.1 Additional requirements for pendent
sprinklers
Continuation
IRC 2024 60 E3601.7.3 Metering centers New from HBA
IRC 2024 61 E3606.5 Surge protection Continuation
IRC 2024 62 E3702.2 Branch-circuit ampere rating New from HBA
IRC 2024 62 E3702.3 Ten-ampere branch circuits New from HBA
IRC 2024 63 E3802.4 In unfinished basements Continuation
IRC 2024 64 E3901.4.2 Island and peninsular countertops and work
surfaces
New from HBA of SC
IRC 2024 64 E3901.4.3 Receptacle outlet location New from HBA of SC
IRC 2024 65 E3902 Ground-Fault and Arc-Fault Circuit-Interrupter
Protection
Continuation
IRC 2024 66 E3902.5 Basement receptacles Continuation
IRC 2024 67 E3902.12 Specific appliance outlets New from HBA of SC
IRC 2024 68 E3902.14 Outdoor outlets
(NEC 2023 02)
Continuation
IRC 2024 69 E3902.21 Arc-fault circuit-interrupter protection Continuation
IRC 2024 70 E4002.11 Bathtub and shower space New from HBA of SC
IRC 2024 71 E4002.14 Tamper-resistant receptacles Continuation
IRC 2024 72 Chapter 44 Referenced Standards Continuation
IRC 2024 73 Chapter 44 Referenced Standards
(IMC 2024 02)
New from Daikin Comfort
IRC 2024 74 Appendix BF Patio Covers Continuation
IRC 2024 75 Appendix BO Existing Buildings and Structures Continuation
IRC 2024 76 Appendix BB Tiny Houses Continuation
2024 INTERNATIONAL FIRE CODE (IFC)
IFC 2024 01 202 General definitions – Primitive camp structure Continuation
IFC 2024 02 202 General definitions – Recreational fire Continuation
IFC 2024 03 [BG] 203.2.8 Assembly Group A-3
(IBC 2024 03)
Continuation
IFC 2024 04 315.3.3 Equipment rooms Continuation
IFC 2024 05 503.1.2 Additional access Continuation
IFC 2024 06 503.2.1 Dimensions Continuation
IFC 2024 07 507.1 Required water supply Continuation
IFC 2024 08 507.5.1 Where required Continuation
IFC 2024 09 507.5.1.1 Hydrant for standpipe systems Continuation
IFC 2024 10 507.5.4 Obstruction Continuation
IFC 2024 11 606.3.3.2 Grease accumulation New from Midlands Fire
Marshal Association
IFC 2024 12 607.1 General Continuation
IFC 2024 13 901.6.3 Records Continuation
5
2024 Building Code Modification Index (11/3/2025 V.1)
Page 153 of 332
Index # Code Modifications New/Continuation
IFC 2024 16 1010.2.13 Controlled egress doors in Group I-1, I-2 and I-4
(Adult Day Care Occupancy only)
(IBC 2024 06)
Continuation
IFC 2024 17 1016.2 Egress through intervening spaces
(IBC 2024 07)
Continuation
IFC 2024 18 1032.11 Maintenance of the listed occupancy load signage New from Midlands Fire
Marshal Association
IFC 2024 19 2303.2 Emergency disconnect switches New from Midlands Fire
Marshal Association
IFC 2024 20 2303.2.2 Testing Continuation
IFC 2024 21 2304.3.6 Communications New from Midlands Fire
Marshal Association
IFC 2024 22 2305.5 Fire extinguishers Continuation
IFC 2024 23 2307.4 Location of dispensing operations and equipment Continuation
IFC 2024 24 2307.7 Public fueling of motor vehicles Continuation
IFC 2024 25 4106.6 Clearance Requirements Continuation
IFC 2024 26 6101.1 Scope Continuation
IFC 2024 27 6104.2 Maximum capacity within established limits New from Southeast
Propane Alliance (SEPA)
IFC 2024 28 6106.1 Attendants Continuation
IFC 2024 29 6107.3 Clearance to combustibles New from Southeast
Propane Alliance (SEPA)
IFC 2024 30 6107.4 Protecting containers from vehicles Continuation
IFC 2024 31 6109.13 Protection of containers Continuation
IFC 2024 32 6110.1 Removed from service New from Southeast
Propane Alliance (SEPA)
IFC 2024 33 6111.2.1 Near residential, educational and institutional
occupancies and other high-risk areas
Continuation
IFC 2024 34 6111.2.1 Near residential, educational and institutional
occupancies and other high-risk areas
New from Southeast
Propane Alliance (SEPA)
2024 INTERNATIONAL PLUMBING CODE (IPC)
IPC 2024 01 202 General Definitions – Drinking Fountain Continuation
IPC 2024 02 202 General Definitions – Bottle-Filling Station Continuation
IPC 2024 03 202 General Definitions – Water Cooler Continuation
IPC 2024 04 202 General Definitions – Water Dispenser Continuation
IPC 2024 05 403.1.1 Fixture calculations
(IBC 2024 11)
Continuation
IPC 2024 06 403.2 Separate facilities
(IBC 2024 12)
Continuation
2024 INTERNATIONAL MECHANICAL CODE (IMC)
IMC 2024 01 504.9.2 Duct Installation Continuation
IMC 2024 02 Table 1103.1 Refrigerant Classification, Amount and OEL
(IRC 2024 73)
New from Daikin Comfort
6
Page 154 of 332
Index # Code Modifications New/Continuation
IMC 2024 03 1109.2.5 Refrigerant pipe shafts New from Johnson and
Associates
IMC 2024 04 1109.3.2 Shaft ventilation New from Daikin Comfort
IMC 2024 02 Chapter 15 Referenced Standards New from Daikin Comfort
2024 INTERNATIONAL FUEL GAS CODE (IFGC)
IFGC 2024 01 401.9 Identification Continuation
IFGC 2024 02 401.10 Third-party testing and Certification Continuation
IFGC 2024 03 404.17.1 Limitations
(IRC 2024 46)
New from Omega Flex, Inc.
IFGC 2024 04 412.4 Listed equipment Continuation
IFGC 2024 05 412.6 Location Continuation
IFGC 2024 06 412.8.3 Vehicle impact protection Continuation
IFGC 2024 07 412.10 Private fueling of motor vehicles Continuation
IFGC 2024 08 505.1.1 Commercial cooking appliances vented by exhaust
hoods
Continuation
2023 NATIONAL ELECTRICAL CODE (NEC)
NEC 2023 01 210.8(A) Dwelling Units Continuation
NEC 2023 02 210.8(F) Outdoor Outlets
(IRC 2024 68)
Continuation
NEC 2023 03 210.12(B) Dwelling Units Continuation
7
Page 155 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 01
Code Section: [A] 101.4.7 Existing Buildings
Proponent: American Concrete Institute (ACI)
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 01 [A] 101.4.7
Reason: To establish minimum requirements for the evaluation, design, construction, repair and
rehabilitation of concrete structural elements in existing buildings.
Modification:
[A] 101.4.7 Existing buildings. The provisions of the International Existing Building Code shall apply to
matters governing the repair, alternation, change of occupancy, addition to and relocation of existing
buildings.
101.4.7.1 Structural concrete. In addition, assessment, repairs, and restoration of structural concrete in
accordance with ACI 562 shall be permitted.
Exception:
ACI 562 shall not be used for the evaluation or design of repairs or rehabilitation of elements of
seismic force-resisting system that result in strength, stiffness, or ductility of those elements
different from the pre-damage condition.
(Add new referenced standard to Chapter 35 as follows)
ACI American Concrete Institute
38800 Country Club Drive
Farmington Hills, MI 48331
Standard reference number Title Referenced in code section number
562-19 Code Requirements for Assessment, Repair, and Rehabilitation of Existing Concrete Structures
101.4.7.1
8
2024 Building Code Modification Index (11/3/2025 V.1)
Page 156 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 02
Code Section: 202 Definitions
Vapor Retarder, Ground Contact (new definition)
Primitive Camp Structure (new definition)
Proponent: Building Officials Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 02 202
IBC 2018 IBC 2018 01 202
Reason: To provide clear definitions and uniform interpretation of the phrases.
Modification:
202 Definitions:
Vapor Retarder, Ground Contact: Ground contact vapor retarder class shall be defined using the
requirements of ASTM E1745, Class A, B, or C -Standard specification for water vapor retarders used in
contact with soil or granular fill under concrete slabs.
Primitive Camp Structure: Shall include any structure permanent or temporary in nature, used for outdoor
camping (transient), open on at least one side with no fully enclosed habitable spaces, less than 400 square
feet under roof, and not classified as a res idential occupancy due to lack of electrical, plumbing,
mechanical and sprinkler systems.
9
2024 Building Code Modification Index (11/3/2025 V.1)
Page 157 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 03
Code Section: 303.4 Assembly Group A-3
Proponent: Building Officials Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 04 303.4
IBC 2018 IBC 2018 02 303.4
Reason: Add to the listing of A-3 occupancies the following use: Structures, without a commercial kitchen,
used in agritourism activity as defined by S.C. Code Ann. 46-53-10(1).
Modification:
303.4 Assembly Group A-3. Group A-3 occupancy includes assembly uses intended for worship, recreation
or amusement and other assembly uses not classified elsewhere in Group A including, but not limited to:
Amusement arcades
Art galleries
Bowling alleys
Community halls
Courtrooms
Dance halls (not including food or drink consumption)
Exhibition halls
Funeral parlors
Greenhouses for the conservation and exhibition of plants that provide public access
Gymnasiums (without spectator seating)
Indoor swimming pools (without spectator seating)
Indoor tennis courts (without spectator seating)
Lecture halls
Libraries
Museums
Places of religious worship
Pool and billiard parlors
Structures, without a commercial kitchen, used in agritourism activity as defined by S.C. Code Ann. 46-53-10(1)
Waiting areas in transportation terminals
10
2024 Building Code Modification Index (11/3/2025 V.1)
Page 158 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 04
Code Section: 312.1 General
Proponent: Building Officials Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 05 312.1
IBC 2018 IBC 2018 03 312.1
Reason: “Structures primarily used or associated with outdoor camping activities” include, but are not limited
to, shelters, tree stands, sheds, rustic cabins, campfire shelters, shelters, tents, tepees, or other indigenous
huts used only for campers or program participants, or used in conjunction with outdoor camping activities
such as hiking, fishing, hunting, or nature appreciation, regardless of material used for construction. These
structures are not to inclu de utilities such as mechanical, electrical or plumbing. Requiring that at least one
side of the building be open will provide ventilation for any outside hearing source or propane lighting that
may be used within the structure, and provide a clear path of egress travel to the outside. Limiting the size to
400 square feet will require larger buildings to be classified as a residential structure. Not allowing electrical,
plumbing or mechanical systems will maintain the integrity of a primitive structure.
Modification:
312.1 General. Buildings and structures of an accessory character and miscellaneous structures not classified in any
specific occupancy shall be constructed, equipped and maintained to conform to the requirements of this code
commensurate with the fire and life hazard incidental to their occupancy. Group U shall include, but not be limited
to, the following:
Agricultural buildings
Aircraft hangars, accessory to a one- or two-family residence (see Section 412.4)
Barns
Carports
Communication equipment structures with a gross floor area of less than 1,500 square feet (139 m2)
Fences more than 7 feet (2134 mm) in height
Grain silos, accessory to a residential occupancy
Livestock shelters
Primitive Camp Structures
Private garages
Retaining walls
Sheds
Stables
Tanks
Towers
11
2024 Building Code Modification Index (11/3/2025 V.1)
Page 159 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 05
Code Section: 706.1 General
Proponent: Building Officials Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 07 706.1
IBC 2018 IBC 2018 05 706.1
Reason: Unusually restrictive —in an attempt to clarify this section for the purpose of uniform
enforcement, the ICC created a huge error which takes away the designers’ options to leave an existing,
nonconforming building alone when separated by a fire wall. The intent was to show that the fire
protection systems, utilities, access, and egress could be one system when a fire wall is utilized, and do
not have to be separate systems due to the fire wall creating different buildings. This requirement would
unjustly and significantly drive up the cost of construction as it relates to additions to existing buildings.
Modification:
706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. Each
portion of a building separated by one or more firewalls may be considered a separate building. The extent
and location of such fire walls shall provide a complete separation. Where a fire wall separates
occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of
each separation shall apply.
12
2024 Building Code Modification Index (11/3/2025 V.1)
Page 160 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 06
Code Section: 1010.2.13 Controlled egress doors in Group I-1, I-2 and I-4 (Adult Day Care Occupancy
only)
Proponent: Midlands Fire Marshal Association
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 10 1010.2.14
Reason: To prevent nuisance alarms and reduce elopement issues when serving clients with Dementia or
Alzheimer’s, or similar health care issues.
Modification:
1010.2.13 Controlled egress doors in Groups I-1, I-2, and I-4 (Adult Day Care Occupancy only).
Controlled egress electrical locking systems where egress is controlled by authorized personnel shall be permitted
on doors in the means of egress in Group I -1, I-2, and I-4 (Adult Day Care occupancy only) occupancies where the
clinical needs of persons receiving care require their containment. Controlled egress doors shall be permitted in such
occupancies where the building is equipped throughout with an automatic sprinkler system in accordance with
Section 903.3.1.1 or an approved automatic smoke detectio n system installed in accordance with Section 907,
provided that the doors are installed and operate in accordance with all of the following:
1. The door's electric locks shall unlock on actuation of the automatic sprinkler system or automatic smoke detection system
allowing immediate free egress.
2. The door's electric locks shall unlock on loss of power to the electrical locking system or to the electric lock mechanism
allowing immediate free egress.
3. The electric locking system shall be installed to have the capability of unlocking the electric locks by a switch located at the
fire command center, a nursing station or other approved location. The switch shall directly break power to the electric lock.
4. A building occupant shall not be required to pass through more than one door equipped with a controlled egress locking
system before entering an exit.
5. The procedures for unlocking the doors shall be described and approved as part of the emergency planning and
preparedness required by Chapter 4 of the International South Carolina Fire Code.
6. All clinical staff shall have the keys, codes or other means necessary to operate the controlled egress electrical locking
systems.
7. Emergency lighting shall be provided at the door.
8. The electromechanical or electromagnetic locking device shall be listed in accordance with either UL 294 or UL 1034.
Exceptions:
1. Items 1 through 4 shall not apply to doors to areas occupied by persons who, because of clinical needs, require restraint
or containment as part of the function of a psychiatric or cognitive treatment area.
2. Items 1 through 4 shall not apply to doors to areas where a listed egress control system is utilized to reduce the risk of
child abduction from nursery and obstetric areas of a Group I-2 hospital.
13
2024 Building Code Modification Index (11/3/2025 V.1)
Page 161 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 07
Code Section: 1016.2 Egress through intervening spaces
Proponent: Building Officials Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 11 1016.2
IBC 2018 IBC 2018 10 1016.2
Reason: This is a longstanding modification that was updated in 2018 based on changes in the 2018 IBC.
The modification provides additional egress options by adding the exceptions below.
Modification:
1016.2 Egress through intervening spaces. Egress through in tervening spaces shall comply with this
section.
1. Exit access through an enclosed elevator lobby is permitted. Where access to two or more exits or
exit access doorways is required in Section 1006.2.1, access to not less than one of the required
exits shall be provided without travel through the enclosed elevator lobbies required by Section
3006 of the South Carolina Building Code . Where the path of exit access travel passes through an
enclosed elevator lobby, the level of protection required for the enclosed elevator lobby is not
required to be extended to the exit unless direct access to an exit is required by other sections of
this code.
2. In other than Group H occupancies, egress from a room or space is allowed to pass through
adjoining or intervening rooms or areas provided that such adjoining rooms or areas and the area
served are accessory to one or the other and provide a discernible path of egress travel to an exit.
3. In Group H occupancies, egress from a room or space is allowed to pass through adjoining or
intervening rooms or areas provided that such adjoining rooms or areas are the same or lesser
hazard occupancy group and provide a discernible path of egress travel to an exit.
4. An exit access shall not pass through a room that can be locked to prevent egress.
Exception: An electrically locked exit access door providing egress from an elevator lobby shall
be permitted in accordance with Section 1010.2.14.
5. Means of egress from dwelling units or sleeping areas shall not lead through other sleeping areas,
toilet rooms or bathrooms.
Exception: Dwelling units or sleeping areas in R -1 and R-2 occupancies shall be permitted to
egress through other sleeping areas serving adjoining rooms that are part of the same dwelling
unit or guest room.
(Page 2 of IBC 2024 07 - Section 1016.2)
14
2024 Building Code Modification Index (11/3/2025 V.1)
Page 162 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
6. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes.
Exceptions:
1. Means of egress are not prohibited through a kitchen area serving adjoining rooms
constituting part of the same dwelling unit or sleeping unit.
2. Means of egress are not prohibited through stockrooms in Group M occupancies where all of
the following are met:
2.1. The stock is of the same hazard classification as that found in the main retail area.
2.2. Not more than 50 percent of the exit access is through the stockroom.
2.3. The stockroom is not subject to locking from the egress side.
2.4. There is a demarcated, minimum 44 -inch-wide (1118 mm) aisle defined by full- or
partial-height fixed wall s a wall not less than 42 inches (1067 mm) high or similar
construction that will maintain the required width and lead directly from the retail area
to the exit without obstructions.
15
2024 Building Code Modification Index (11/3/2025 V.1)
Page 163 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 08
Code Section: 1803.2 Investigations required
Proponent: Building Officials Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 14 1803.2
IBC 2018 IBC 2018 11 1803.2
Reason: The IBC requires a geotechnical investigation for all projects regardless of size. The only exception
which allows the building official to waive the requirements puts unnecessary liability on the building
official to determine if adequate information can be gathered from adjacent sites. In areas that must
account for seismic activity, the conditions may vary in as few as 100 yards. For large commercial projects,
the soil conditions may have a drastic effect on the design of the structure; however, for smaller projects
the soil condition has significantly less bearing on its design. It is often determined on small projects that
the soil conditions do not have an effect on the design of the structure. See ASCE 7 -20-3-1, Exception.
Each of the equations results in a period of vibration of less than 0.5 seconds and exceeds the size of a
typical one-story structure.
Modification:
1803.2 Investigations required. Geotechnical investigations shall be conducted in accordance
with Sections 1803.3 through 1803.5.
Exceptions:
1. The building official shall be permitted to waive the requirement for a geotechnical
investigation where satisfactory data from adjacent areas is available that demonstrates an
investigation is not necessary for any of the conditions in Sections 1803.5.1 through 1803.5.6 and
Sections 1803.5.10 and 1803.5.11.
2. For single story buildings not more than 5,000 sq ft and not more than 30ft in height, a site
specification investigation report is not required if the seismic design category is determined by
the design professional in accordance with Chapter 20 of ASCE 7.
16
2024 Building Code Modification Index (11/3/2025 V.1)
Page 164 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 09
Code Section: 1907.4 Vapor retarder
Proponent: Structural Engineers Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 16 1907.1
IBC 2018 IBC 2018 12 1907.1
Reason: To bring the IBC into compliance with the American Concrete Institute’s standards.
Modification:
1907.4 Vapor retarder. A 6-mil (0.006 inch; 0.15 mm) 10-mil (0.010 inch) polyethylene ground contact
vapor retarder with joints lapped not less than 6 inches (152 mm) shall be placed between the base course
or subgrade and the concrete floor slab, or other approved equivalent methods or materials shall be used
to retard vapor transmission through the floor slab.
Exception: A vapor retarder is not required:
1. For detached structures accessory to occupancies in Group R-3, such as garages, utility buildings
or other unheated facilities.
2. For unheated storage rooms having an area of less than 70 square feet (6.5 m2) and
carports attached to occupancies in Group R-3.
3. For buildings of other occupancies where migration of moisture through the slab from
below will not be detrimental to the intended occupancy of the building.
4. For driveways, walks, patios and other flatwork that will not be enclosed at a later date.
5. Where approved based on local site conditions.
17
2024 Building Code Modification Index (11/3/2025 V.1)
Page 165 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 10
Code Section: 2303.2.3 Other means during manufacture
Proponent: Building Officials Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 17 2303.2.2
IBC 2018 IBC 2018 13 2303.2.2
Reason: The language in the 2018 code would prevent the use of methods for the treatment of fire -
retardant treated wood that have been in use since at least 2009. We’re not aware of any issues with
products that have been tested in accordance with code requirements.
Modification:
[BF] 2303.2.3 Other means during manufacture. For wood products impregnated with chemicals by other
means during manufacture, the treatment shall be an integral part of the manufacturing process of the
wood product. The treatment shall provide permanent protection to all surfaces of the wood product. The
use of paints, coating, stains or other surface treatments is not an approved method of protection as
required in this section.
18
2024 Building Code Modification Index (11/3/2025 V.1)
Page 166 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 11
Code Section: [P] 2902.1.1 Fixture calculations
Emergency Code Modification
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 19 [P] 2902.1.1
Reason: Gender-neutral gang-type bathrooms pose a serious threat to the health and safety of all by
increasing the incident of sexual violence against women and children, as well as increasing the incident
of wrongful accusations of assault, voyeurism, and the like. Gender -neutral gang-type bathrooms also
undermine and reduce the “safe spaces” for victims of human trafficking, as well as discriminating against
women and children by disproportionately decreasing the available number of bathroom spaces for
women and children, while men will have access to both water closet compartments and urinal spaces. In
addition, the common use sink space discriminates against women and children by disproportionately
decreasing the area available for women to address personal needs, such as menstrual or other medical
care, nursing and baby changing activities.
Modification:
[P] 2902.1.1 Fixture calculations. To determine the occupant load of each sex, the total occupant load
shall be divided in half. To determine the required number of fixtures, the fixture ratio or ratios for each
fixture type shall be applied to the occupant load of each sex in accordance with Table 2902.1. Fractional
numbers resulting from applying the fixture ratios of Table 2902.1 shall be rounded up to the next whole
number. For calculations involving multiple occupancies, such fractional numbers for each occupancy shall
first be summed and then rounded up to the next whole number.
Exceptions:
1. The total occupant load shall not be required to be divided in half where approved statistical
data indicates a distribution of the sexes of other than 50 percent of each sex.
2. Where multiple-user facilities are designed to serve all genders, the minimum fixture count
shall be calculated 100 percent, based on total occupant load. In such multiple-user user facilities,
each fixture type shall be in accordance with ICC A117.1
19
2024 Building Code Modification Index (11/3/2025 V.1)
Page 167 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 12
Code Section: [P] 2902.2 Separate facilities
Emergency Code Modification
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 20 [P] 2902.2
Reason: Exception 6 is not necessary, as Exceptions 1 -5 provide sufficient guidance and latitude for
business, schools, churches and other similar large-capacity spaces, to provide gender-neutral spaces with
adequate privacy protections.
Modification:
[P] 2902.2 Separate facilities. Where plumbing fixtures are required, separate facilities shall be provided
for each sex.
Exceptions:
1. Separate toilet facilities shall not be required for dwelling units and sleeping units.
2. Separate toilet facilities shall not be required in structures or tenant spaces with a total occupant
load, including both employees and customers, of 15 or fewer.
3. Separate toilet facilities shall not be required in mercantile occupancies in which the maximum
occupant load is 100 or fewer.
4. Separate toilet facilities shall not be required in business occupancies in which the maximum
occupant load is 25 or fewer.
5. Separate toilet facilities shall not be required to be designated by sex where single -user toilet
rooms are provided in accordance with Section 2902.1.2.
6. Separate toilet facilities shall not be required where rooms having both water closets and lavatory
fixtures are designed for use by all persons regardless of sex and privacy is provided for water
closets in accordance with Section 405.3.4 of the International Plumbing Code and for urinals in
accordance with Section 405.3.5 of the International Plumbing Code.
20
2024 Building Code Modification Index (11/3/2025 V.1)
Page 168 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 13
Code Section: Appendix H Signs
Proponent: Structural Engineers Association of South Carolina
Previous Code Cycles Previous Modification
Number
Previous Code Section
IBC 2021 IBC 2021 18 Appendix H
IBC 2018 IBC 2018 14 Appendix H
IBC 2015 IBC 2015 07 Appendix H
IBC 2012 IBC 2012 05 Appendix H
Reason: To provide minimum requirements for signs for the protection of people and property.
Modification:
Appendix H Signs
The provisions in Appendix H are adopted for use statewide.
Appendix H gathers in one place the various standards that regulate the construction and protection of
outdoor signs. Wherever possible, the appendix provides standards in performance language, thus
allowing the widest possible application.
21
2024 Building Code Modification Index (11/3/2025 V.1)
Page 169 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 01
Code Section: R202 Definitions: Accepted Engineering Practice
Proponent: Coastal Code Enforcement Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 01 R202
IRC 2018 IRC 2018 01 R202
IRC 2015 IRC 2015 01 R202
IRC 2012 IRC 2012 01 R202
Reason: To provide a clear definition and uniform interpretation of the phrase.
Modification:
A definition of “Accepted Engineering Practice” was added:
Accepted Engineering Practice . The performance design of structures and/or structural elements that
vary from prescriptive design methods of this code. Such design shall be made with accepted design
standards by a South Carolina licensed Architect or Engineer as permitted by existing state law.
22
2024 Building Code Modification Index (11/3/2025 V.1)
Page 170 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 02
Code Section: R202 Definitions: Crawl Space
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 02 R202
Reason: To provide additional clarification.
Modification:
R202 Definitions
[RB] CRAWL SPACE. An underfloor space that is not a basement. Spaces under decks and porches that do
not contain mechanical equipment and are separated by a foundation wall are not to be considered
crawlspaces.
23
2024 Building Code Modification Index (11/3/2025 V.1)
Page 171 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 03
Code Section: R202 Definitions: Sleeping Loft
R.310.3 Location
R314.1 General
Section R315 Sleeping Lofts
R319.1 Emergency escape and rescue opening required
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: The section is overly restrictive, hard to apply and duplicates existing safety rules.
Modification:
R202 Definitions
[RB] SLEEPING LOFT. A space designated for sleeping on an intermediate level or levels
between the floor and ceiling of a story, open on one or more sides to the room in which the
space is located, and in accordance with Section R315.
(delete section without substitution)
R310.3 Location. Smoke alarms shall be installed in the following locations:
1. In each sleeping room.
2. Outside each separate sleeping area in the immediate vicinity of the bedrooms.
3. On each additional story of the dwelling unit, including basements and habitable attics and not
including crawl spaces and uninhabita ble attics. In dwelling units with split levels and without an
intervening door between the adjacent levels, a smoke alarm installed on the upper level shall suffice
for the adjacent lower level provided that the lower level is less than one full story below the upper
level.
4. Not less than 3 feet (914 mm) horizontally from the door or opening of a bathroom that contains a
bathtub or shower unless this would prevent placement of a smoke alarm required by this section.
5. In the hallway and in the room open to the hallway in dwelling units where the ceiling height of a room
open to a hallway serving bedrooms exceeds that of the hallway by 24 inches (610 mm) or more.
6. Within the room to which a sleeping loft is open, in the immediate vicinity of the sleeping loft .
24
2024 Building Code Modification Index (11/3/2025 V.1)
Page 172 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
(page 2 of IRC 2024 03 - R202, R310.1, etc.)
R314.1 General. Mezzanines shall comply with Sections R314.2 through R314.5.
Exception: Sleeping lofts in dwelling units and sleeping units shall be permitted to comply with
Section R315, subject to the limitations in Section R315.2.
SECTION R315
SLEEPING LOFTS
(Delete section without substitution)
R319.1 Emergency escape and rescue opening required. Basements, habitable attics, the room to which
a sleeping loft is open, and every sleeping room shall have not less than one operable emergency escape
and rescue opening . Where basements contain one or more sleeping rooms, an emergency escape and
rescue opening shall be required in each sleeping room. Emergency escape and rescue openings shall open
directly into a public way, or to a yard or court that opens to a public way.
Exceptions:
1. Basements used only to house mechanical equipment not exceeding a total floor area of 200
square feet (18.58 m2).
2. Storm shelters constructed in accordance with ICC 500.
3. Where the dwelling unit or townhouse unit is equipped with an automatic sprinkler system
installed in accordance with Section P2904, sleeping rooms in basements shall not be required to
have emergency escape and rescue openings provided that the basement has one of the following:
3.1. One means of egress complying with Section R318 and one emergency escape and rescue
opening.
3.2. Two means of egress complying with Section R318.
4. A yard shall not be required to open directly into a public way where the yard opens to an
unobstructed path from the yard to the public way. Such path shall have a width of not less than
36 inches (914 mm).
25
2024 Building Code Modification Index (11/3/2025 V.1)
Page 173 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 04
Code Section: R301.2.1 Wind design criteria
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 04
Reason: Provides added consistency and ease.
Modification:
R301.2.1 Wind design criteria. Buildings and portions thereof shall be constructed in accordance with the
wind provisions of this code using the ultimate design wind speed in Table R301.2 as determined from
Figure R301.2(2) American Society of Civil Engineers (ASCE) Hazard Tool. The local building official may
delineate the wind design category within their jurisdiction, as long as, it does not surpass those provided
on the American Society of Civil Engineers (ASCE) Hazard Tool website. The structural provisions of this
code for wind loads are not permitted where wind design is required as specified in Section R301.2.1.1.
Where different construction methods and structural materials are used for various portions of a building,
the applicable requirements of this section for each portion shall apply. Where not otherwise specified,
the wind loads listed in Table R301.2.1(1) adjusted for height and exposure using Table R301.2.1(2) shall
be used to determine design load performance requirements for wall coverings, curtain walls, roof
coverings, exterior windows, skylights, garage doors and exterior doors. Asphalt shingles shall be designed
for wind speeds in accordance with Section R905.2.4 . Metal roof shingles shall be designed for wind
speeds in accordance with Section R905.4.4. A continuous load path shall be provided to transmit the
applicable uplift forces in Section R802.11 from the roof assembly to the foundation. Where ultimate
design wind speeds in Figure R301.2(2) are less than the lowest wind speed indicated in the prescriptive
provisions of this code, the lowest wind speed indicated in the prescriptive provisions of this code shall be
used.
26
2024 Building Code Modification Index (11/3/2025 V.1)
Page 174 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 05
Code Section: R301.2.2 Seismic provisions
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: The structural requirements add cost without significant safety benefit in low -to-moderate
seismic rick areas.
Modification:
(removes “C” from #1 below)
R301.2.2 Seismic provisions. Buildings within the scope of this code as defined in Section R101.2 shall be
constructed in accordance with the requirements of this section and other seismic requirements of this
code. The seismic provisions of this code shall apply as follows:
1. Townhouses and buildings as permitted by the exceptions to Section R101.2 containing three or
more dwelling units in Seismic Design Categories C, D0, D 1 and D2.
2. Detached one- and two-family dwellings and buildings as permitted by the exceptions to Section
R101.2 containing less than three dwelling units in Seismic Design Categories D0, D 1 and D2.
Buildings in Seismic Design Category E shall be designed to resist seismic loads in accordance with
the International Building Code , except where the seismic design categ ories are reclassified to
lower seismic design categories in accordance with Section R301.2.2.1. Components of buildings
not required to be designed to resist seismic loads shall be constructed in accordance with the
provisions of this code.
27
2024 Building Code Modification Index (11/3/2025 V.1)
Page 175 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 06
Code Section: R301.2.2.1 Determination of seismic design category
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 04
Reason: Provides added consistency and ease.
Modification:
R301.2.2.1 Determination of seismic design category. Buildings shall be assigned a seismic design
category in accordance with the American Society of Civil Engineers (ASCE) Hazard Tool . Figures
R301.2.2.1(1) through R301.2.2.1(7), except as otherwise required by Section R401.4. The local building
official may delineate the seismic design category within the jurisdiction, as long as, it does not surpass
those provided on the American Society of Civil Engineers (ASCE) Hazard Tool website.
28
2024 Building Code Modification Index (11/3/2025 V.1)
Page 176 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 07
Code Section: R302.1 Exterior Walls (adds exception #6)
Proponent: Coastal Code Enforcement Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 06 R302.1
IRC 2018 IRC 2018 04 R302.1
IRC 2015 IRC 2015 01 R302.1
IRC 2012 IRC 2012 02 R302.1
Reason: To provide a clear definition and uniform interpretation of the phrase
Modification:
R302.1 Exterior walls. Construction, projections, openings and penetrations of exterior walls of
dwellings, townhouses and accessory buildings shall comply with Table R302.1(1) based on fire
separation distance; or dwellings and townhouses equipped throughout with an automatic sprinkler
system installed in accordance with Section P2904 shall comply with Table R302.1(2) based on fire
separation distance.
For the purposes of determining fire separation distance, dwellings and townhouses on the same
lot shall be assumed to have an imaginary line between them. Where a new dwelling or townhouse is to
be erected on the same lot as an existing dwelling or townhouse, the location of the assumed imaginary
line with relation to the existing dwelling or townhouse shall be such that the exist ing dwelling or
townhouse meets requirements of this section.
Where a lot line exists between adjacent townhouse units, fire separation distance of exterior walls
shall be measured to the lot line. Where a lot line does not exist between adjacent townhouse units, an
imaginary line shall be assumed between the adjacent townhouse units and fire separation distance of
exterior walls shall be measured to the imaginary line. Fire separation distance and requirements of
Section R302.1 shall not apply to walls separating townhouse units that are required by Section R302.2.
Exceptions:
1. Walls, projections, openings or penetrations in walls perpendicular to the line used to determine
the fire separation distance.
2. Walls of individual dwelling units and their accessory buildings located on the same lot.
3. Detached tool sheds and storage sheds, playhouses and similar structures exempted from permits
are not required to provide wall protection based on location on the lo t. Projections beyond the
exterior wall shall not extend over the lot line.
29
2024 Building Code Modification Index (11/3/2025 V.1)
Page 177 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
(page 2 of IRC 2024 07- R302.1)
4. Detached garages accessory to a dwelling unit located within 2 feet (610 mm) of a lot line are
permitted to have roof eave projections not exceeding 4 inches (102 mm).
5. Foundation vents installed in compliance with this code are permitted.
6. Fire separation distance.
a. The minimum fire separation distance for improvement constructed on a lot shown on: [ i ] a
recorded bonded or final subdivision plat, or [ii] a sketch plan, site plan, plan of phased
development or preliminary plat approved by the local governing authority, which was recorded
or approved prior to the implementation of 2012 International Residential Code and which shows
or describes lesser setbacks than the fire separation distances provided in Table R302.1(1), shall
be equal to the lesser setbacks, but in no event less than 3 feet (914 mm).
b. The minimum fire separation distance for improvements constructed on a lot where the local
governing authority has, prior to the implementation of 2012 International Residential Code: [ i ]
accepted exactions or issued conditions, [ ii ] granted a special exception, [ iii ] entered into a
development agreement, [ iv ] approved a variance, [ v ] approved a planned development district,
or [ vi ] otherwise approved a specific development plan which contemplated or provided for
setbacks less than the fire separation distances provided in Table R302.1(1), shall be equal to the
lesser setback, but in no event less than 3 feet (914 mm).
30
2024 Building Code Modification Index (11/3/2025 V.1)
Page 178 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 08
Code Section: R302.1 Exterior Walls (adds exception #7)
Proponent: Building Official’s Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 06 R302.1
Reason: To account for eave projections on townhomes.
Modification:
(Modification adds below exception to prior modification IRC 2024 07 for Section R302.1 Exterior walls)
Exceptions:
7. Aesthetic roof and siding projections may extend beyond the common wall of a townhouse unit
over an adjoining unit's property line as long as the construction of the projection does not damage
the integrity of the fire -rated assembly, the projection is completely supported by the common
wall, the projection is protected by a 1 -hour construction or fire retardant -treated wood, and the
projection is limited to 18 inches (457 mm). These projections shall not contain any plumbing,
electrical or mechanical installations. An easement may be required by the jurisdiction to ensure
future access to this projection for repair and maintenance.
31
2024 Building Code Modification Index (11/3/2025 V.1)
Page 179 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 09
Code Section: R302.2.7 Meter Location (new section)
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: Provides design and installation flexibility. Aligns with utility company practices and NEC
requirements. Maintains fire-resistance integrity of common walls. Clarifies enforcement for local building
officials and reduces conflicts during plan review.
Modification:
R.302.2.7 Meter Location. Installation of multiple electrical meters on the exterior wall of townhomes is
permitted, provided the installation does not breach the fire-resistance-rated wall assembly.
32
2024 Building Code Modification Index (11/3/2025 V.1)
Page 180 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 10
Code Section: R302.4.1 Through penetrations
Proponent: Building Official’s Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 09 R302.4.1
Reason: The common walls between townhouses are essentially property lines between adjacent
owners, and utilities or services of any kind should not pass through a property line.
Modification:
R302.4.1 Through penetrations. Through penetrations of fire-resistance-rated wall or floor assemblies
shall comply with Section R302.4.1.1 or R302.4.1.2. No penetrations shall pass completely through the
fire-rated assembly separating townhouse units.
Exceptions:
1. Where the penetrating items are steel, ferrous or copper pipes, tubes or conduits, the annular
space shall be protected as follows:
1.1. In concrete or masonry wall or floor assemblies, concrete, grout or mortar shall be permitted
where installed to the full thickness of the wall or floor assembly or the thickness required to
maintain the fire-resistance rating, provided that both of the following are complied with:
1.1.1. The nominal diameter of the penetrating item is not more than 6 inches (152 mm).
1.1.2. The area of the opening through the wall does not exceed 144 square inches
(92 900 mm2).
1.2. The material used to fill the annular space shall prevent the passage of flame and hot gases
sufficient to ignite cotton waste where subjected to ASTM E119 or UL 263 time temperature
fire conditions under a positive pressure differential of not less than 0.01 inch of water (3 Pa)
at the location of the penetration for the time period equivalent to the fire -resistance rating
of the construction penetrated.
2. The annular space created by the penetration of water -filled fire sprinkler piping, provided that
the annular space is filled using a material complying with Item 1.2 of Exception 1.
33
2024 Building Code Modification Index (11/3/2025 V.1)
Page 181 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 11
Code Section: R302.5.1 Opening protection
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 10 R302.5.1
IRC 2018 IRC 2018 05 R302.5.1
IRC 2015 IRC 2015 05 R302.5.1
Reason: Lack of supporting documentation proving that self -closing devices contribute to fire or carbon
monoxide safety.
Modification:
R302.5.1 Opening protection. Openings from a private garage directly into a room used for sleeping
purposes shall not be permitted. Other openings between the garage and dwelling unit shall be equipped
with solid wood doors not less than 1 3/8 inches (35 mm) in thickness, solid or hon eycomb-core steel
doors not less than 1 3/8 inches (35 mm) thick, or 20-minute fire-rated doors. Doors shall be self-latching
and equipped with a self-closing or automatic-closing device.
34
2024 Building Code Modification Index (11/3/2025 V.1)
Page 182 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 12
Code Section: R302.13 Fire protection of floors
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 11 R302.13
IRC 2018 IRC 2018 06 R302.13
IRC 2015 IRC 2015 06 R302.13
Reason: Requirements are unwarranted and unnecessary.
Modification:
R302.13 Fire protection of floors. Floor assemblies that are not required elsewhere in this code to be fire-
resistance rated, shall be provided with a 1/2-inch (12.7 mm) gypsum wallboard membrane, 5/8-inch (16
mm) wood structural panel membrane, or equivalent on the underside of the floor f raming member.
Penetrations or openings for ducts, vents, electrical outlets, lighting, devices, luminaires, wires, speakers,
drainage, piping and similar openings or penetrations shall be permitted.
Exceptions:
1. Floor assemblies located directly over a space protected by an automatic sprinkler system in
accordance with Section P2904, NFPA 13D, or other approved equivalent sprinkler system.
2. Floor assemblies located directly over a crawl space not intended for storage or for the installation of
fuel-fired or electric-powered heating appliances. Floor assemblies located directly over a crawl space.
3. Portions of floor assemblies shall be permitted to be unprotected where complying with the following:
3.1. The aggregate area of the unprotected portions does not exceed 80 square feet (7.4 m2) per story.
3.2. Fireblocking in accordance with Section R302.11.1 is installed along the perimeter of the
unprotected portion to separate the unprotected portion from the remainder of the floor assembly.
4. Wood floor assemblies using dimension lumber or structural composite lumber equal to or greater
than 2-inch by 10-inch (50.8 mm by 254 mm) nominal dimension, or other approved floor assemblies
demonstrating equivalent fire performance.
5. Wood floor assemblies less than 600 square feet (55.7 m2) within detached accessory structures with
no habitable space above them.
35
2024 Building Code Modification Index (11/3/2025 V.1)
Page 183 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 13
Code Section: 304.1.1 Field treatment
Proponent: Structural Engineers Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 22 R317.1.1
IRC 2018 IRC 2018 14 R317.1.1
IRC 2015 IRC 2015 13 R317.1.1
IRC 2012 IRC 2012 12 R317.1.1
Reason: To add the preservative-treated wood product manufacturer’s field treatment
recommendations as a method of compliance.
Modification:
R304.1.1 Field treatment. Field-cut ends, notches and drilled holes of preservative-treated wood shall
be treated in the field in accordance with AWPA M4 or in accordance with the preservative-treated
wood product manufacturer’s recommendations.
36
2024 Building Code Modification Index (11/3/2025 V.1)
Page 184 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 14
Code Section: R305.1 Subterranean termite control methods
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 23 318.1
IRC 2018 IRC 2018 15 318.1
Reason: Provides clarification that additional treatment methods are permissible if it adheres to Section
27-1085 of the Rules and Regulations for the Enforcement of the South Carolina Pesticide Control Act and
enforced by the Clemson University Department of Pesticide Regulations.
Modification:
R305.1 Subterranean termite control methods. In areas subject to damage from termites as
indicated by Table R301.2 , protection shall be by one, or a combination, of the following
methods:
1. Chemical termiticide treatment in accordance with Section R305.2.
2. Termite-baiting system installed and maintained in accordance with the label.
3. Pressure-preservative-treated wood in accordance with the provisions of Section R304.1.
4. Naturally durable termite-resistant wood.
5. Physical barriers in accordance with Section R305.3 and used in locations as specified in Section
R304.1.
6. Cold-formed steel framing in accordance with Sections R505.2.1 and R603.2.1.
7. Treatments may be conducted as outlined in Section 27-1085 of the Rules and Regulations for the
Enforcement of the South Carolina Pesticide Control Act and enforced by the Clemson University
Department of Pesticide Regulation.
37
2024 Building Code Modification Index (11/3/2025 V.1)
Page 185 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 15
Code Section: R305.4 Foam Plastic Protection
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 24 R318.4
IRC 2018 IRC 2018 16 R318.4
Reason: Provided language establishes a best management practice in order to inspect for termites and
other wood-destroying organisms. The exception should be deleted due to a lack of rigorous experimental
investigation and robust data to indicate a foam insulation product can be treated or produced in a way
to make the product 100 % effective against subterranean termite damage or an effective barrier to
prevent termites a route into a structure.
Modification:
R305.4 Foam plastic protection. In areas where the probability of termite infestation is “very heavy” as
indicated in Figure R305.4, extruded and expanded polystyrene, polyisocyanurate and other foam plastics
shall not be installed on the exterior face or under interior or exterior foundation walls or slab foundations
located below grade. The clearance between foam plastics installed above grade and exposed earth shall
be not less than 6 inches (152 mm). For crawl space applications, foam plastic shall be installed so as to
provide a termite inspection gap of no less than 6 inches (152 mm) along the top of the foundation w all
and foundation sill plate.
Exceptions:
1. Buildings where the structural members of walls, floors, ceilings and roofs are entirely
of noncombustible materials or pressure-preservative-treated wood.
2.Where in addition to the requirements of Section R318.1, an approved method of protecting
the foam plastic and structure from subterranean termite damage is used.
3.2. On the interior side of basement walls.
38
2024 Building Code Modification Index (11/3/2025 V.1)
Page 186 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 16
Code Section: R305.5 Termite inspection strip
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 25 R318.5
Reason: Provides added consistency and ease for inspections
Modification:
R305.5 Termite inspection strip. Where foam plastic is applied in accordance with Section R318.4 , a
continuous 6 -inch (152 mm) strip centered along the sill plate shall be left open for termite activity
inspection.
39
2024 Building Code Modification Index (11/3/2025 V.1)
Page 187 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 17
Code Section: R309 Automatic Sprinkler Systems
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 18 R313
IRC 2018 IRC 2018 12 R313
IRC 2015 IRC 2015 12 R313
IRC 2012 IRC 2012 10 R313.1
IRC 2012 IRC 2012 11 R313.2
Reason: Unusually restrictive
Modification:
SECTION R309
AUTOMATIC FIRE SPRINKLER SYSTEMS
R309.1 Townhouse automatic fire sprinkler systems. An automatic residential fire sprinkler system shall not be
required to be installed in townhouses when constructed in accordance with Section R302.2.
Exception: An automatic residential fire sprinkler system shall not be required where additions or
alterations are made to existing townhouses that do not have an automatic residential fire sprinkler
system installed.
R309.1.1 Design and installation. Automatic residential fire sprinkler systems for townhouses when installed shall
be designed and installed in accordance with Section P2904 or NFPA 13D.
R309.2 One- and two-family dwellings automatic sprinkler systems. An automatic residential fire sprinkler
system shall be installed shall not be required to be installed in one- and two-family dwellings.
Exception: An automatic sprinkler system shall not be required for additions or alterations to
existing buildings that are not already provided with a sprinkler system.
R309.2.1 Design and installation. Automatic residential fire sprinkler systems when installed shall be designed
and installed in accordance with Section P2904 or NFPA 13D.
40
2024 Building Code Modification Index (11/3/2025 V.1)
Page 188 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 18
Code Section: R316.3 Story above grade plane
Proponent(s): Home Builders Association of South Carolina (2021) and Building Officials Association of
South Carolina (2024)
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 29 R326.3
Reason: The deletions bring the definition of the habitable attic in line with the 2018 IRC.
Modification:
R316.3 Story above grade plane. A habitable attic shall be considered a story above grade plane.
Exceptions: A habitable attic shall not be considered to be a story above grade plane provided
that the habitable attic meets all the following:
1. The aggregate area of the habitable attic is either of the following:
1.1. Not greater than one-third one-half of the floor area of the story below.
1.2. Not greater than one-half of the floor area of the story below where the habitable
attic is located within a dwelling unit equipped with an automatic fire sprinkler system in
accordance with Section P2904.
2. The occupiable space is enclosed by the roof assembly above, knee walls, if applicable, on the
sides and the floor- ceiling assembly below.
3. The floor of the habitable attic does not extend beyond the exterior walls of the story below.
4. Where a habitable attic is located above a third story, an automatic sprinkler system in
accordance with Section P2904 shall be installed in the habitable attic and remaining portion
of the townhouse unit or dwelling unit or units located beneath the habitable attic.
41
2024 Building Code Modification Index (11/3/2025 V.1)
Page 189 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 19
Code Section: R318.3.1 Floor elevations at the required egress doors
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: Replacing “threshold” with “primary floor level” provides clarity for enforcement and design.
“Threshold” can vary by product, while “primary floor level” offers a consistent, measurable reference.
Modification:
R318.3.1 Floor elevations at the required egress doors. Landings or finished floors at the required egress
door shall be not more than 1 1/2 inches (38 mm) lower than the top of the threshold primary floor level.
Exception: The landing or floor on the exterior side shall be not more than 7 3/4 inches (196 mm)
below the top of the threshold provided that the door does not swing over the landing or floor.
Where exterior landings or floors serving the required egress door are not at grade, they shall be
provided with access to grade by means of a ramp in accordance with Section R318.8 or a stairway in
accordance with Section R318.7.
42
2024 Building Code Modification Index (11/3/2025 V.1)
Page 190 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 20
Code Section: R318.7.5.1 Risers
Proponent: Structural Engineers Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 15 R311.7.5.1
IRC 2018 IRC 2018 09 R311.7.5.1
IRC 2015 IRC 2015 09 R311.7.5.1
IRC 2012 IRC 2012 07 R311.7.5.1
Reason: To establish a maximum height for masonry risers
Modification:
R318.7.5.1 Risers. The maximum riser height shall be not more than 7 3/4 inches (196 mm). The
maximum riser height for masonry stairs shall be 8 inches (203 mm). The riser height shall be measured
vertically between leading edges of the adjacent treads. The greatest riser height within any flight of stairs
shall not exceed the smallest by more than 3/8 inch (9.5 mm). Risers shall be vertical or sloped from the
underside of the nosing of the tread above at an angle not more than 30 degrees (0.51 rad) from the
vertical. At open risers, openings located more than 30 inches (762 mm), as measured vertically, to the
floor or grade below shall not permit the passage of a 4- inch-diameter (102 mm) sphere.
Exceptions:
1. The opening between adjacent treads is not limited on spiral stairways.
2. The riser height of spiral stairways shall be in accordance with Section 318.7.11.1.
3. The opening between adjacent treads is not limited on stairs with a total rise of 30 inches (762 mm)
or less.
43
2024 Building Code Modification Index (11/3/2025 V.1)
Page 191 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 21
Code Section: R321.1.1 Where required
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 16 R312.1.1
IRC 2018 IRC 2018 10 R312.1.1
IRC 2015 IRC 2015 10 R312.1.1
IRC 2012 IRC 2012 08 R312.1.1
Reason: No technical justification to substantiate a 36-inch measurement away from the leading edge of
the walking surface or tread to determine when a guard should be required.
Modification:
R321.1.1 Where required. Guards shall be provided for those portions of open -sided walking surfaces,
including floors, stairs, ramps and landings that are located more than 30 inches (762 mm) measured
vertically to the floor or grade below at any point within 36 inches (914 mm) horizontally to the edge of
the open side. Insect screening shall not be considered as a guard.
Guards shall be located along open -sided walking surfaces of all decks, porches, balconies, floors, stairs,
ramps and landings that are located more than 30 inches (762 mm) measured vertically to the floor or
grade below; and at any point where a downward slope exceeds 3V:12H within 36 inches (914 mm)
horizontally to the edge of the open side. Insect screening shall not be considered as a guard.
44
2024 Building Code Modification Index (11/3/2025 V.1)
Page 192 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 22
Code Section: R321.2 Window fall protection
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 17 R312.2
IRC 2018 IRC 2018 11 R312.2
IRC 2015 IRC 2015 11 R312.2
IRC 2012 IRC 2012 09 R312.2
Reason: Unusually restrictive
Modification:
(Delete without substitution)
R321.2 Window fall protection. Window fall protection shall be provided in accordance with Sections
R321.2.1 and R321.2.2.
R321.2.1 Window opening height. In dwelling units, where the bottom of the clear opening of an
operable window opening is located less than 24 inches (610 mm) above the finished floor and
greater than 72 inches (1829 mm) above the finished grade or other surface below on the exterior
of the building, the operable window shall comply with one of the following:
1. Operable window openings will not allow a 4 -inch-diameter (102 mm) sphere to pass
through where the openings are in their largest opened position.
2. Operable windows are provided with window opening control devices or fall prevention
devices that comply with ASTM F2090.
R321.2.2 Emergency escape and re scue openings. Where an operable window serves as an
emergency escape and rescue opening, a window opening control device or fall prevention device,
after operation to release the control device or fall prevention device allowing the window to fully
open, shall not reduce the net clear opening area of the window unit to less than the area required
by Sections R319.2.1 and R319.2.2.
45
2024 Building Code Modification Index (11/3/2025 V.1)
Page 193 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 23
Code Section: R325.3 Mechanical ventilation
Proponent: Coastal Code Enforcement Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 12 R303.4
IRC 2018 IRC 2018 07 R303.4
IRC 2015 IRC 2015 07 R303.4
IRC 2012 IRC 2012 05 R303.4
Reason: The blower door test is not required with the current State Energy Standard (2009 International
Energy Conservation Code) and is not applicable.
Modification:
(Delete without substitution)
R303.4 Mechanical ventilation. Buildings and dwelling units complying with Section 1102.5.1 shall be
provided with mechanical ventilation in accordance with Section M1505, or with other approved means
of ventilation.
46
2024 Building Code Modification Index (11/3/2025 V.1)
Page 194 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 24
Code Section: Figure R327.1 Minimum Fixture Clearances
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 13 R307.1
IRC 2018 IRC 2018 08 R307.1
IRC 2015 IRC 2015 08 R307.1
IRC 2012 IRC 2012 06 R307.2
IRC 2006 IRC 2006 09 R307.2
IRC 2003 IRC 2003 05 R307.2
Reason: No valid reason exists to justify a minimum clearance of 15 inches
Modification:
Change the minimum dimension for the side clearance between bathtubs and water closets or bidets from
15 inches to 12 inches.
47
2024 Building Code Modification Index (11/3/2025 V.1)
Page 195 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 25
Code Section: R404.1.9.2 Masonry piers supporting floor girders
Proponent: Home Builders Association of South Carolina and Structural Engineers Association of South
Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 31 R404.1.9.2
IRC 2018 IRC 2018 20 R404.1.9.2
IRC 2015 IRC 2015 16 R404.1.9.2
IRC 2012 IRC 2012 13 R404.1.9.2
Reason: Unusually restrictive
Modification:
R404.1.9.2 Masonry piers supporting floor girders. Masonry piers supporting wood girders sized in
accordance with Tables R602.7(1) and R602.7(2) shall be permitted in accordance with this section. Piers
supporting girders for interior bearing walls shall have a minimum nominal dimension of 12 inches (305
mm) and a maximum height of 10 feet (3048 mm) be filled solidly with grout or type M or S mort ar and
shall have a minimum nominal dimension of 8 inches (203 mm) and a maximum height not exceeding 10
times the nominal thickness from top of footing to bottom of sill plate or girder. Piers supporting girders
for exterior bearing walls shall have a min imum nominal dimension of 12 inches (305 mm) and a
maximum height of 4 feet (1220 mm) from top of footing to bottom of sill plate or girder. Piers supporting
beams and girders for exterior bearing walls shall be filled solidly with grout or type M or S mor tar; shall
contain a minimum of one #4 (13 mm) dowel mid -depth; and shall have a minimum nominal dimension
of 8 inches (203 mm) and a maximum height of 4 times the nominal thickness from top of footing to
bottom of sill plate or girder unless it can be sho wn by accepted engineering practice that there is
sufficient foundation wall along the foundation line to resist the imposed lateral loads, in which case the
maximum height shall not exceed 10 times the nominal thickness. Girders and sill plates shall be anchored
to the pier or footing in accordance with Section R403.1.6 or Figure R404.1.5.3. Floor girder bearing shall
be in accordance with Section R502.6.
48
2024 Building Code Modification Index (11/3/2025 V.1)
Page 196 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 26
Code Section: R408.3 Unvented Crawl Space
Proponent: Structural Engineers Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 32 R408.3
IRC 2018 IRC 2018 21 R408.3
Reason: ASTM E1745 is the industry standard for plastic vapor retarders used under concrete slabs or in
contact with soil. It is also the main standards for evaluating plastic films that will be used in this application.
Three performance classes are outlined A, B and C (with Class A being the strongest). Performance levels are
the same for each class, less than 0.1 perms. Tensile strength and puncture resistance change with each class.
ASTM E1745 refers to ASTM E154 “Standard Test Methods for Water Vapor Retarders Used in Contact with
Earth Under Concrete Slabs, On Walls or as Ground Cover”, which describes test methods for testing the
performance of a plastic film after it is subjected to certain elements. These standards outline the methodology
whereby plastic vapor retarders are tested. Simply having a low perm rating is not enough when it comes to
real-life conditions. Vapor retarders/barriers must also be tough enough to endure the rigors of construction,
since this will determine their true long-term ability to protect against water vapor intrusion.
Modification:
R408.3 Unvented crawl space. For unvented under-floor spaces, the following items shall be provided:
1. Exposed earth shall be covered with a continuous Class I vapor retarder meeting ASTM E1745 Class A. Joints
of the vapor retarder shall overlap by 6 inches (152 mm) and shall be sealed or taped. The edges of the vapor
retarder shall extend not less than 6 inches (152 mm) up the stem wall and shall be attached and sealed to
the stem wall or insulation.
2. One of the following shall be provided for the under-floor space:
2.1. Continuously operated mechanical exhaust ventilation at a rate equal to 1 cubic foot per minute
(0.47 L/s) for each 50 square feet (4.7m 2) of crawl space floor area, including an air pathway to the
common area (such as a duct or transfer grille), and perimeter walls insulated in accordance with
Section N1102.2.11.1.
2.2. Conditioned air supply sized to deliver at a rate equal to 1 cubic foot per minute (0.47 L/s) for each
50 square feet (4.7 m2) of under-floor area, including a return air pathway to the common area (such
as a duct or transfer grille), and perimeter walls insulated in accordance with Section N1102.2.11.1.
2.3. Plenum in existing structures complying with Section M1601.5, if under -floor space is used as a
plenum.
2.4. Dehumidification sized in accordance with manufacturer's specifications.
49
2024 Building Code Modification Index (11/3/2025 V.1)
Page 197 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 27
Code Section: R408.3 Unvented Crawl Space
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 33 R408.3
IRC 2018 IRC 2018 21 R408.3
Reason: Provides added clarity and consistency of codes between regulation and statute.
Modification:
R408.3 Unvented crawl space. For unvented under-floor spaces, the following items shall be provided:
1. Exposed earth shall be covered with a continuous vapor retarder meeting ASTM E1745 Class A. Joints
of the vapor retarder shall overlap by 6 inches (152 mm) and shall be sealed or taped. The edges of the
vapor retarder shall extend not less than 6 inches (152 mm) up the stem wall and shall be attached and
sealed to the stem wall or insulation.
2. One of the following shall be provided for the under-floor space:
2.1. Continuously operated mechanical exhaust ventilation at a rate equal to 1 cubic foot per minute (0.47 L/s) for
each 50 square feet (4.7m2) of crawl space floor area, including an air pathway to the common area (such as
a duct or transfer grille), and perimeter walls insulated in accordance with Section N1102.2.11.1 the South
Carolina Energy Standard Act.
2.2. Conditioned air supply sized to deliver at a rate equal to 1 cubic foot per minute (0.47 L/s) for each 50 square
feet (4.7 m2) of under-floor area, including a return air pathway to the common area (such as a duct or transfer
grille), and perimeter walls insulated in accordance with Section N1102.2.11.1 the South Carolina Energy
Standard Act.
2.3. Plenum in existing structures complying with Section M1601.5, if under-floor space is used as a plenum.
2.4. Dehumidification sized in accordance with manufacturer's specifications.
50
2024 Building Code Modification Index (11/3/2025 V.1)
Page 198 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 28
Code Section: R408.4 Access
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 34 R408.4
IRC 2018 IRC 2018 22 R408.4
IRC 2015 IRC 2015 17 R408.4
Reason: To allow access openings under a doorway
Modification:
R408.4 Access. Access shall be provided to all under-floor spaces. Access openings through the floor shall
be not smaller than 18 inches by 24 inches (457 mm by 610 mm). Openings through a perimeter wall
shall be not less than 16 inches by 24 inches (407 mm by 610 mm). W here any portion of the through -
wall access is below grade, an areaway not less than 16 inches by 24 inches (407 mm by 610 mm) shall
be provided. The bottom of the areaway shall be below the threshold of the access opening. Through
wall access openings shall not be located under a door to the residence. See Section M1305.1.3 for access
requirements where mechanical equipment is located under floors.
51
2024 Building Code Modification Index (11/3/2025 V.1)
Page 199 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 29
Code Section: R408.8 Under floor vapor retarder
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 35 R408.4
Reason: Application is not practical.
Modification:
(Section deleted without substitution)
R408.8 Under -floor vapor retarder. In Climate Zones 1A, 2A and 3A below the warm -humid line, a
continuous Class I or II vapor retarder shall be provided on the exposed face of air-permeable insulation
installed between the floor joists and exposed to the grade in the under -floor space. The vapor retarder
shall have a maximum water vapor permeance of 1.5 perms when tested in accordance with Procedure B
of ASTM E96.
Exception: The vapor retarder shall not be required in unvented crawl spaces constructed in
accordance with Section R408.3.
52
2024 Building Code Modification Index (11/3/2025 V.1)
Page 200 of 332
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 30
Code Section: R502.12.4 Truss design drawings
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 36 R502.11.4
IRC 2018 IRC 2018 23 R502.11.4
IRC 2015 IRC 2015 18 R502.11.4
IRC 2012 IRC 2012 14 R502.11.4
IRC 2006 IRC 2006 21 R502.11.4
IRC 2003 IRC 2003 17 R502.11.4
Reason: The section was modified to allow the approval of truss design drawings by local building officials
to occur at the time of the framing inspection, rather than at an undefined time prior to installation.
Modification:
R502.12.4 Truss design drawings. Truss design drawings , prepared in compliance with Section
R502.12.1, shall be submitted to the building official and approved prior to installation at the time of
their inspection. Truss design drawings shall be provided with the shipment of trusses delivered to the
job site. Truss design drawings shall include, at a minimum, the information specified as follows:
(No changes to items 1-12)
53
2024 Building Code Modification Index (11/3/2025 V.1)
Page
Text truncated. Open the original for the full document.
Source: Beaufort County website. First collected Oct 24, 2026.