RecordWell Data

County Council Meeting — Agenda Packet

Beaufort County · Beaufort County · County Council Meeting · meeting of Sep 28, 2026 · Agenda packets

Open the original document More from Beaufort County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

County Council Meeting Beaufort County, SC Council Chambers, Administration Building Beaufort County Government Robert Smalls Complex 100 Ribaut Road, Beaufort Monday, September 28, 2026 6:00 PM AGENDA COUNCIL MEMBERS: Alice Howard, Chair David P. Bartholomew Logan Cunningham York Glover Lawrence McElynn Thomas Reitz Anna Maria Tabernik, Vice-Chair Paula Brown Gerald Dawson Mark Lawson Joseph Passiment 1. CALL TO ORDER: Alice Howard, Chair 2. PLEDGE OF ALLEGIANCE AND INVOCATION: Alice Howard, Chair 3. STATEMENT OF COMPLIANCE WITH FOIA: Alice Howard, Chair 4. APPROVAL OF AGENDA 5. APPROVAL OF MINUTES a. Minutes from County Council Workshop August 28, 2026. 6. PROCLAMATIONS a. Proclamation recognizing Mr. McShane on receiving the Order of the Palmetto. b. Proclamation recognizing National Preparedness Month. 7. ADMINISTRATOR'S REPORT 8. PUBLIC COMMENT PERIOD - 30 MINUTES TOTAL 9. LIAISON AND COMMITTEE REPORTS 10. AGENDA ITEMS a. Recommend approval to fund due diligence and negotiate terms of acquisitions for the following proposed Green Space Program applications: V&R Investment Tract, Seaside Oaks Tracts, and Okatie Bluff Road Tracts b. Business License Appeal: Geismar North America Page 1 of 246 11. ORDINANCES FOR THIRD READING: a. 2026/41: An Ordinance amending the Community Development Code (CDC): section 5.3.20 (applicability), 4.2.20 (standards for free-standing accessory buildings/structures), 5.8.100 (screening), and 10.1.190 (definitions) b. 2026/42: An Ordinance amending the zoning map for 1.4 acres (R300 012 000 0129 0000, R300 012 000 047A 0000) from T2R to T2RC. 12. ORDINANCES FOR SECOND READING: a. 2026/43: An ordinance to amend Ordinance 2026/29 to authorize the transfer of funds. (PUBLIC HEARING) b. 2026/44: An Ordinance Amending the FY2027 Budget for Stormwater Utility Operations, Carryover Purchase Orders, Accommodations & Hospitality Tax projects, and Facility Operations. (PUBLIC HEARING) c. 2026/45: An Ordinance Authorizing the County Administrator to Execute the Necessary Documents and Provide Funding for the Purchase of Real Property Identified as TMS Nos. R200-010-000- 0340-0000, R200-010-000-021G-0000, and R200-010-000-0446-0000 from Brickyard Commons, LLC for the Royal Pines Stormwater Project in the amount of $3,475,000.(PUBLIC HEARING) d. 2026/46: An Ordinance Authorizing the County Administrator or negotiating authority in accordance with Resolutions 2019/44 and 2021/20 to execute any and all necessary documents for the acceptance of Right of Way and/or Temporary Construction Easement properties as shown on EXHIBIT A Pages 1-4 associated with the Sidewalks and Multi-use Pathways – Safe Routes to Schools and EXHIBIT A Pages 5-8 associated with the Lady’s Island Corridor Traffic Improvements.(PUBLIC HEARING) 13. ORDINANCES FOR FIRST READING: a. 2026/47: An Ordinance authorizing the County Administrator to execute an Electric Line Easement with Dominion Energy on the property known as Pocotaligo Preserve (TMS R710 012 000 0001 0000 and R710 012 000 0072 0000). b. 2026/48: An Ordinance amending the Beaufort County Code of Ordinances, Chapter74 - Building and Building Regulations, Section 74-64, Adoption of Building Codes (Amends Code of Ordinances to adopt the 2024 State Mandated Code Editions). 14. RESOLUTIONS: a. 2026/43: A Resolution authorizing the County Administrator to enter into a License Agreement with the State of South Carolina for the repair of a “Flywheel” artifact to be installed and displayed at Fort Fremont Preserve. 15. ADJOURNMENT To watch committee or County Council meetings or for a complete list of agendas and backup packages, please visit: https://beaufortcountysc.gov/council/council-committee-meetings/index.html Page 2 of 246 County Council Workshop Beaufort County, SC Council Chambers, Administration Building Beaufort County Government Robert Smalls Complex 100 Ribaut Road, Beaufort *OR AT THE CONCLUSION OF THE NORTHERN REGIONAL PLAN IMPLEMENTATION COMMITTEE MEETING, NO SOONER THAN 10:00 AM* Friday, August 28, 2026 10:00 AM MINUTES Watch the video stream available on the County's website to hear the Council’s discussion of a specific topic or the complete meeting https://beaufortcountysc.new.swagit.com/videos/399472 1. Call to Order Chair Howard called the meeting to order at 10:00 AM Present Chair Alice Howard Vice-Chair Anna Maria Tabernik Council Member David Bartholomew Council Member Paula Brown Council Member Logan Cunningham - Virtual @ 10:04 AM Council Member Gerald Dawson Council Member York Glover Council Member Mark Lawson - Virtual Council Member Lawrence McElynn - Virtual Council Member Joseph Passiment - Virtual Council Member Thomas Reitz 2. Pledge of Allegiance Chair Howard led the Pledge of Allegiance. 3. Statement of Compliance with FOIA Chair Howard stated that public notification of this meeting had been published, posted, and distributed in compliance with SC FOIA. 4. Approval of Agenda Motion: It was moved by Vice-Chair Tabernik, seconded by Council Member Brown to approve the agenda. The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council Member Brown, Council Member Dawson, Council Member Glover, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member Reitz. The motion passed 10:0. Page 3 of 246 5. Public Comment Period Public comments were taken. Please watch the video stream on the county's website to view the full comment period. https://beaufortcountysc.new.swagit.com/videos/399472 6. AGENDA ITEMS ● Discussion regarding revisions to the Beaufort County Employee Handbook, specifically to section 1.6, Whistleblower Policy Council directed Administration and Staff to come to the next Finance, Administration, and Economic Development Committee with a draft Resolution with the proposed changes and edits to the policy. Please watch the video stream on the county's website to view the full discussion. https://beaufortcountysc.new.swagit.com/videos/399472 7. Adjouirnment COUNTY COUNCIL OF BEAUFORT COUNTY BY: _________________________________________ Alice G. Howard, Chairman ATTEST: ______________________________________ Sarah W. Brock, Clerk to Council Ratified: Page 4 of 246 Whereas, the Order of the Palmetto is the highest civilian honor bestowed by the Governor of South Carolina and recognizes individuals whose exceptional lifetime achievements, service, and contributions have made a meaningful and enduring impact on the State of South Carolina; and Whereas, Michael “Mike” McShane has dedicated his life and career to the conservation, protection, and responsible stewardship of South Carolina’s natural resources, with a particular commitment to the Lowcountry and the ACE Basin; and Whereas, Mr. McShane has provided extraordinary leadership through his service as Chairman of the South Carolina Department of Natural Resources Board and Chairman of the South Carolina Conservation Bank, helping advance efforts to permanently protect hundreds of thousands of acres of South Carolina’s vital natural resources; and Whereas, Mr. McShane continues to serve Beaufort County as Chairman of the Beaufort County Green Space Advisory Committee, where his leadership, knowledge, and commitment have helped advance the preservation of significant natural lands and the protection of the County’s unique environmental heritage; and Whereas, in recognition of his exceptional public service and lifelong dedication to conservation, Senator Chip Campsen presented Mr. McShane with the Order of the Palmetto on behalf of Governor Henry McMaster on June 24, 2026, honoring his significant contributions to the State of South Carolina; and Whereas, Beaufort County Council recognizes that Mr. McShane’s leadership, vision, and dedication have strengthened conservation efforts throughout Beaufort County and the Lowcountry and have helped preserve the natural character and environmental legacy of our community. Now, therefore be it resolved, that the Beaufort County Council proudly recognizes and congratulates Mr. McShane on receiving the Order of the Palmetto, South Carolina’s highest civilian honor, and extends its sincere appreciation for his decades of exceptional leadership, service, and unwavering commitment to conserving the lands, waters, wildlife, and natural resources of Beaufort County and South Carolina. Beaufort County Council commends Mr. McShane for his continued dedication to our community and congratulates him on this well-deserved and prestigious honor. Dated this 21st day of September 2026. ___________________________________ Alice Howard, Chair Beaufort County Council ~ Proclamation ~ Page 5 of 246 Whereas, September is observed as National Preparedness Month, an annual observance dedicated to raising awareness about preparing for emergencies and disasters and strengthening the resilience of individuals, families, businesses, and communities; and Whereas, South Carolina communities face a variety of natural and man-made hazards, including hurricanes, flooding, severe storms, wildfires, earthquakes, and other emergencies that can threaten lives, property, and critical infrastructure; and Whereas, effective preparedness requires strong partnerships among individuals, local governments, emergency management organizations, law enforcement, first responders, state agencies, nonprofit organizations, and other community partners; and Whereas, the South Carolina State Guard is a professional military organization and component of the South Carolina Military Department, separate and distinct from the National Guard, and is composed of volunteer officers and enlisted personnel who stand ready to serve the citizens of South Carolina when called upon; and Whereas, the South Carolina State Guard supports preparedness and emergency response through disaster relief, search and rescue, medical support, logistics, engineering, legal services, chaplain and counseling services, communications, and other specialized capabilities, working alongside state and local partners to prepare for, respond to, and recover from emergencies and disasters; and Whereas, the members of the South Carolina State Guard exemplify a commitment to public service by volunteering their time, skills, and expertise to assist their fellow South Carolinians and strengthen the State’s ability to respond when disaster strikes; and Whereas, National Preparedness Month provides an important opportunity to encourage residents, businesses, organizations, and community partners to take meaningful steps to prepare for emergencies while recognizing those who help build safer and more resilient communities; and Whereas, the Beaufort County Council recognizes the importance of preparedness and the value of strong partnerships among county government, emergency management, public safety agencies, and the South Carolina State Guard in protecting the citizens of Beaufort County. Now, therefore be it resolved, that the Beaufort County Council hereby recognizes September 2026 as National Preparedness Month in Beaufort County, encourages all residents, businesses, organizations, and community partners to take meaningful steps to prepare for emergencies and disasters, and recognizes and honors the members of the South Carolina State Guard for their dedicated volunteer service to the people of South Carolina and their continued commitment to preparedness, public service, disaster response, and the safety and resilience of communities throughout the State. Dated this 28th day of September 2026. ___________________________________ Alice Howard, Chair ~ Proclamation ~ Page 6 of 246 Beaufort County Council Page 7 of 246 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: RECOMMEND APPROVAL TO FUND DUE DILIGENCE AND NEGOTIATE TERMS OF ACQUISITIONS FOR THE FOLLOWING PROPOSED GREEN SPACE PROGRAM APPLICATIONS: V&R INVESTMENT TRACT, SEASIDE OAKS TRACTS, AND OKATIE BLUFF ROAD TRACTS MEETING NAME AND DATE: County Council September 28, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Motion to approve, modify, or deny the recommendations of the Green Space Advisory Committee. PRESENTER INFORMATION: Mr. Mike McShane, Chair of Green Space Advisory Committee & Mr. Mark Davis, Green Space Program Manager (15 minutes) ITEM BACKGROUND: During their Sept. 10, 2026 meeting, the Green Space Advisory Committee (GSAC) reviewed new applications for consideration of pursuing due diligence and negotiations. The recommendations from the GSAC are as follows: (1) Corridor Protection Application: V&R Investment Tract, Beaufort; Political Jurisdiction – Town of Port Royal; Geographic Region – Northern (Pursue Due Diligence) (2) Farmland Preservation Application: Seaside Oaks Tracts, Saint Helena Island; Political Jurisdiction – Unincorporated Beaufort County; Geographic Region – Eastern (Pursue Due Diligence) (3) Conservation Easement Application: Okatie Bluff Road Tracts, Okatie; Political Jurisdiction – Unincorporated Beaufort County; Geographic Region – Western (Pursue Due Diligence) FISCAL IMPACT: Green Space Program Fund Account #4706 (fund balance as of Sept.4, 2026 - $100,279,854): 1. V&R Investment Tract - $35,000 2. Seaside Oaks Tracts - $15,000 3. Okatie Bluff Road Tracts - $15,000 APPROVAL HISTORY: No history Page 8 of 246 Page 9 of 246 Page 10 of 246 Page 11 of 246 Page 12 of 246 Page 13 of 246 Page 14 of 246 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: 2026/41: AN ORDINANCE AMENDING THE COMMUNITY DEVELOPMENT CODE (CDC): SECTION 5.3.20 (APPLICABILITY), 4.2.20 (STANDARDS FOR FREE-STANDING ACCESSORY BUILDINGS/STRUCTURES), 5.8.100 (SCREENING), AND 10.1.190 (DEFINITIONS) MEETING NAME AND DATE: County Council September 28, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval. PRESENTER INFORMATION: Robert Merchant ITEM BACKGROUND: The Planning Department staff was directed by a member of County Council to explore adopting language that permits shipping containers for agricultural uses. Staff explored other municipalities' ordinances and met with the Beaufort County Farm Bureau to write the proposed text amendments. FISCAL IMPACT: n/a APPROVAL HISTORY: The vote at Natural Resources Committee on August 3, 2026 - 7:0 The vote at First Reading on August 10, 2026 - 10:0 The vote at Second Reading and Public Hearing on September 14, 2026 - 10:0 Page 15 of 246 CDPA-000057-2026 Storage Amendment Page 1 of 5 MEMORANDUM TO: York Glover, Chair, Natural Resources Committee of County Council FROM: Robert Merchant, AICP, Beaufort County Planning and Zoning Department DATE: July 23, 2026 SUBJECT: CONSIDERATION OF TEXT AMENDMENTS TO THE COMMUNITY DEVELOPMENT CODE (CDC): SECTION 5.3.20 (APPLICABILITY), 4.2.20 (STANDARDS FOR FREE STANDING ACCESSORY BUILDINGS/STRUCTURES), 5.8.100 (SCREENING), AND 10.1.190 (S DEFINITIONS) STAFF REPORT: A. BACKGROUND: Case No. CDPA-000057-2026 Applicant: Beaufort County Planning Department Proposed Amendment: Amendment to Section 5.3.20, 4.2.20, 5.8.100, 10.1.190 to Allow Shipping Containers for Bona Fide Agricultural Purposes B. SUMMARY AND BACKGROUND: Currently, there are two sections in the CDC (5.3.20 and 4.2.20) that prohibit the use of shipping containers as structures. It was brought to staff’s attention by a Council Member that it is common practice to use shipping containers in agricultural operations. Therefore, staff was directed to bring forth language to permit them in relation to agricultural uses. At their April meeting, the Planning Commission voted to defer the amendment to give staff time to define Bona fide Agriculture and Shipping Container. Since then, staff has also added further standards for the structure’s size, placement, and use. In addition, a list was compiled, with assistance from the County’s legal department, for the purposes of determining whether a property is being used for bona fide agricultural purposes. At their May meeting, Planning Commission voted to defer the amendment to give staff further time to meet with the farmers of Beaufort County. On May 14th, staff attended a Farm Bureau meeting and discussed the proposed amendment with the group. Based on the input from two meetings, staff has made additional edits that reflect tightening of the necessary documentation for bona fide farm and added buffer requirements. At their June meeting, Planning Commission voted to defer the amendment to have staff address the following: cleaning of language to differentiate standards from semitrailers, Page 16 of 246 CDPA-000057-2026 Storage Amendment Page 2 of 5 annual inspections, screening standards from 100 ft to 200 ft, and the inclusion of “hazardous” as a prohibited type of storage. Staff has addressed all comments except the inspection amendment. Staff does not support the inclusion of an annual inspection into the ordinance. C. TEXT AMENDMENT REVIEW STANDARDS: In determining whether to adopt or deny a proposed Text Amendment, the County Council shall weigh the relevance of and consider whether and the extent to which the proposed amendment: 1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and the purposes of this Development Code; Yes, C4 in the Comprehensive Plan states “promote the preservation and viability of agriculture and forestry.” Removing regulatory barriers to common agricultural practices furthers this goal. 2. Is not in conflict with any provision of this Development Code, or the Code of Ordinances; No, the language is written to provide a specific exemption for agriculture; otherwise, restrictions on shipping containers still apply to other uses. 3. Addresses a demonstrated community need; Yes, it contributes to the viability of agriculture which is an important industry in the rural parts of Beaufort County. 4. Is required by changed conditions; No. 5. Is consistent with the purpose and intent of the zones in this Development Code, or would improve compatibility among uses and ensure efficient development within the County; Yes, in rural areas of the County, there are generally more relaxed design standards for structures used for bona fide agriculture. 6. Would result in a logical and orderly development pattern; and Yes, shipping containers would only be allowed for agricultural uses which are typically on large tracts located in rural districts. 7. Would not result in adverse impacts on the natural environment, including but not limited to water, air, noise, stormwater management, wildlife, vegetation, wetlands, and the natural functioning of the environment. Yes, it would not result in adverse impacts. Any development on the site would be required to adhere to the natural resource protection, tree protection, wetland Page 17 of 246 CDPA-000057-2026 Storage Amendment Page 3 of 5 protection, and stormwater standards in the Community Development Code and the Stormwater BMP Manual. D. RECOMMENDATION: Staff recommends approval. E. PLANNING COMMISSION RECOMMENDATION: At their July 9th meeting, the Planning Commission voted unanimously 6-0 to recommend approval of the text amendment. F. ATTACHMENTS: • Text Amendment Changes Page 18 of 246 CDPA-000057-2026 Storage Amendment Page 4 of 5 5.3.20 Applicability C. Within All Zones. The use of any shipping container or the like, travel trailer, or recreational vehicle (RV) as a primary or accessory structure shall be prohibited in all zoning districts with the exception that shipping containers are permitted as an accessory structure for bona fide agricultural purposes as defined in Section 4.2.20.H (Exemptions for Bona Fide Agricultural Uses). 10.1.190 Shipping container. A detachable, prefabricated, durable steel container designed and intended for and customarily associated with transporting cargo with strength suitable to withstand shipment, storage, and handling. 4.2.20 E. Standards for Freestanding Accessory Buildings/Structures. 2.  Size. Except for the T2R district, individual freestanding accessory structures on a parcel shall not collectively exceed 30 percent of the floor area of the principal structure. This does not include standard two-car garages (less than 600 square feet), accessory dwellings, structures used for bona fide agricultural purposes, and accessory structures used for home businesses and cottage industries. In the T2R district, except for structures used for bona fide agricultural purposes, all freestanding accessory structures shall be clearly incidental and subordinate to the principal structure. 3.  Storage Buildings for Private Residential Use Only. Storage buildings are permitted on residential lots provided they are used only for private residential storage of the property owner or tenant. 4.  Tractor trailers and shipping containers may not be used as accessory structures. 5. Shipping containers may not be used as accessory structures except as exempt in Section 4.2.20.H (Exemptions for Bona Fide Agricultural Uses). F.  Temporary Accessory Uses and Structures. Temporary accessory uses and structures shall be governed by the standards and temporary use procedures set forth in Section 4.3.40 (Temporary Use Permit), and Section 4.3.50 (General Standards for all Temporary Uses and Structures). G.  Storage of Trucks and Heavy Equipment. Semitrailer trucks, their cabs or trailers, construction vehicles or equipment, or commercial vehicles with a gross cargo weight of more than three tons or a gross weight of seven tons shall not be parked on any residential lot or residential street in the C3 zone, any transect zone except T2, or any Community Preservation District unless specifically permitted in Appendix A of this code. H. Exemptions for Bona Fide Agricultural Uses 1. Bona fide agriculture. Good faith commercial and income producing agricultural use of the land meeting the definition of Agriculture and Crop Harvesting as defined in Table 3.1.70 (Land Use Definitions). 2. Structures used for bona fide agricultural uses are exempt from the size limitations as referenced in Section 4.2.20.E.2 (General Standards and Limitations). Page 19 of 246 CDPA-000057-2026 Storage Amendment Page 5 of 5 3. Shipping containers are permitted for bona fide agricultural purposes with the following standards: (a) Shipping containers shall not be stacked. (b) Shipping containers shall not be used as living quarters. No livestock nor pets may be stored in a container. (c) The storage of hazardous waste, explosive, flammable, or toxic materials without proper ventilation is prohibited in shipping containers. (d) Shipping containers shall have a fifty (50) foot setback from all property lines. (e) Shipping containers within two hundred (200) feet of a residential structure or public right-of-way shall be screened as referenced in Section 5.8.100 (Screening). (f) The maximum size of an individual shipping container shall not exceed 400 square feet. 4. Sufficient proof must be provided by the property owner or their agent to demonstrate the property is being used for bona fide agricultural purposes. The applicant shall provide one of the following items to demonstrate this purpose: (a) A copy of the owner/operator’s Schedule F from the most recent income tax return; (b) An approved non-timberland agricultural tax exemption by the Beaufort County Assessor’s Office; (c) USDA Farm Number; or (d) South Carolina Agriculture Tax Exemption (SCATE) card. 5.8.100 - Screening B. Items to be Screened. The following areas shall be screened in accordance with this Section: 1.Large waste receptacles (e.g., dumpsters and cardboard recycling containers) and refuse collection areas; 2.Loading and service areas to the extent practicable; 3.Outdoor storage areas (including, but not limited to, inoperable vehicles, appliances, tires, manufactured homes, building materials, equipment, raw materials, and aboveground storage tanks) located within 200 feet of a public right-of-way; 4.Exterior shopping cart storage areas located adjacent to single-family development; and 5.Ground-level mechanical equipment and utility meters. 6. Shipping containers used for bona fide agricultural purposes located within two hundred (200) feet of a residential structure or public right-of-way. Page 20 of 246 ORDINANCE 2026/ AN ORDINANCE AMENDING THE COMMUNITY DEVELOPMENT CODE (CDC): SECTION 5.3.20 (APPLICABILITY), 4.2.20 (STANDARDS FOR FREE STANDING ACCESSORY BUILDINGS/STRUCTURES), 5.8.100 (SCREENING), AND 10.1.190 (S DEFINITIONS) WHEREAS, Beaufort County currently does not permit shipping containers; and WHEREAS, shipping containers have become a common practice in agricultural operations; and WHEREAS, a goal of the Beaufort County Comprehensive Plan is to promote the preservation and viability of agriculture; and WHEREAS, removing regulatory barriers to common agricultural practices furthers this goal of the Comprehensive Plan; and WHEREAS, the amended language sets standards for shipping containers for bona fide agriculture use; and WHEREAS, the Beaufort County Planning Commission considered the request on July 9, 2026, voting 6-0 to recommend that County Council approve the request; and WHEREAS, County Council now wishes to amend the Community Development Code (CDC) to permit shipping containers for bona fide agricultural purposes. NOW, THEREFORE be it ordained by County Council in a meeting duly assembled as follows: The Community Development Code is hereby amended to permit the use of Shipping Containers. Section 5.3.20, 4.2.20, 5.8.100, and 10.1.90 of the Community Development Code are hereby amended to reflect the language depicted in Exhibit A. Ordained this day of , 2026 Alice Howard, Chairman Sarah Brock, Clerk to Council Page 21 of 246 Exhibit A 5.3.20 Applicability C. Within All Zones. The use of any shipping container or the like, travel trailer, or recreational vehicle (RV) as a primary or accessory structure shall be prohibited in all zoning districts with the exception that shipping containers are permitted as an accessory structure for bona fide agricultural purposes as defined in Section 4.2.20.H (Exemptions for Bona Fide Agricultural Uses). 10.1.190 Shipping container. A detachable, prefabricated, durable steel container designed and intended for and customarily associated with transporting cargo with strength suitable to withstand shipment, storage, and handling. 4.2.20 E. Standards for Freestanding Accessory Buildings/Structures. 2.  Size. Except for the T2R district, individual freestanding accessory structures on a parcel shall not collectively exceed 30 percent of the floor area of the principal structure. This does not include standard two-car garages (less than 600 square feet), accessory dwellings, structures used for bona fide agricultural purposes, and accessory structures used for home businesses and cottage industries. In the T2R district, except for structures used for bona fide agricultural purposes, all freestanding accessory structures shall be clearly incidental and subordinate to the principal structure. 3.  Storage Buildings for Private Residential Use Only. Storage buildings are permitted on residential lots provided they are used only for private residential storage of the property owner or tenant. 4.  Tractor trailers and shipping containers may not be used as accessory structures. 5. Shipping containers may not be used as accessory structures except as exempt in Section 4.2.20.H (Exemptions for Bona Fide Agricultural Uses). F.  Temporary Accessory Uses and Structures. Temporary accessory uses and structures shall be governed by the standards and temporary use procedures set forth in Section 4.3.40 (Temporary Use Permit), and Section 4.3.50 (General Standards for all Temporary Uses and Structures). G.  Storage of Trucks and Heavy Equipment. Semitrailer trucks, their cabs or trailers, construction vehicles or equipment, or commercial vehicles with a gross cargo weight of more than three tons or a gross weight of seven tons shall not be parked on any residential lot or residential street in the C3 zone, any transect zone except T2, or any Community Preservation District unless specifically permitted in Appendix A of this code. H. Exemptions for Bona Fide Agricultural Uses 1. Bona fide agriculture. Good faith commercial and income producing agricultural use of the land meeting the definition of Agriculture and Crop Harvesting as defined in Table 3.1.70 (Land Use Definitions). Page 22 of 246 2. Structures used for bona fide agricultural uses are exempt from the size limitations as referenced in Section 4.2.20.E.2 (General Standards and Limitations). 3. Shipping containers are permitted for bona fide agricultural purposes with the following standards: (a) Shipping containers shall not be stacked. (b) Shipping containers shall not be used as living quarters. No livestock nor pets may be stored in a container. (c) The storage of hazardous waste, explosive, flammable, or toxic materials without proper ventilation is prohibited in shipping containers. (d) Shipping containers shall have a fifty (50) foot setback from all property lines. (e) Shipping containers within two hundred (200) feet of a residential structure or public right-of-way shall be screened as referenced in Section 5.8.100 (Screening). (f) The maximum size of an individual shipping container shall not exceed 400 square feet. 4. Sufficient proof must be provided by the property owner or their agent to demonstrate the property is being used for bona fide agricultural purposes. The applicant shall provide one of the following items to demonstrate this purpose: (a) A copy of the owner/operator’s Schedule F from the most recent income tax return; (b) An approved non-timberland agricultural tax exemption by the Beaufort County Assessor’s Office; (c) USDA Farm Number; or (d) South Carolina Agriculture Tax Exemption (SCATE) card. 5.8.100 - Screening B. Items to be Screened. The following areas shall be screened in accordance with this Section: 1.Large waste receptacles (e.g., dumpsters and cardboard recycling containers) and refuse collection areas; 2.Loading and service areas to the extent practicable; 3.Outdoor storage areas (including, but not limited to, inoperable vehicles, appliances, tires, manufactured homes, building materials, equipment, raw materials, and aboveground storage tanks) located within 200 feet of a public right-of-way; 4.Exterior shopping cart storage areas located adjacent to single-family development; and 5.Ground-level mechanical equipment and utility meters. 6. Shipping containers used for bona fide agricultural purposes located within two hundred (200) feet of a residential structure or public right-of-way. Page 23 of 246 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: 2026/42: AN ORDINANCE AMENDING THE ZONING MAP FOR 1.4 ACRES (R300 012 000 0129 0000, R300 012 000 047A 0000) FROM T2R TO T2RC. MEETING NAME AND DATE: County Council September 28, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval. PRESENTER INFORMATION: Robert Merchant ITEM BACKGROUND: Originally, the applicant applied to request a rezoning of the two parcels from T2R to C4CCMU to rectify a nonconforming office and accommodate a new storage use. These parcels are adjacent to a commercial node. The Planning Commission and staff recommended that the applicant revise their request to T2RC as it is a more appropriate zoning district for St. Helena Island and would still serve the purpose of the rezoning request. Also, T2RC is aligned with the Comprehensive Plan's future land use designation of "Rural." The applicant has since adjusted their request to T2RC. FISCAL IMPACT: n/a APPROVAL HISTORY: The vote at Natural Resources Committee on August 3, 2026 - 7:0 The vote at First Reading on August 10, 2026 - 10:0 The vote at Second Reading and Public Hearing on September 14, 2026 - 9:1 Page 24 of 246 Rezoning T2R to T2RC Page 1 of 4 TO: York Glover, Chair, Natural Resources Committee of County Council FROM: Robert Merchant, AICP, Beaufort County Planning and Zoning Department DATE: July 23, 2026 SUBJECT: CONSIDERATION OF AN ORDINANCE AMENDING THE ZONING MAP FOR 1.4 ACRES (R300 012 000 0129 0000, R300 012 000 047A 0000) FROM T2R TO T2RC STAFF REPORT: A. BACKGROUND: Case No. CDPA-000058-2026 Owner: TSB Properties of Greenwood LLC Applicant: Kevin Dukes District/Map/Parcel: CONSIDERATION OF AN ORDINANCE AMENDING THE ZONING MAP FOR 1.4 ACRES (R300 012 000 0129 0000, R300 012 000 047A 0000) FROM T2R TO T2RC Property Size: 1.4 Acres Current Zoning District: T2R Proposed Zoning District: T2RC B. SUMMARY AND BACKGROUND: Originally, the applicant requested to rezone two parcels (1782 and 1788 Sea Island Parkway) on St. Helena Island from T2 Rural (T2R) to C4 Community Center Mixed Use (C4CCMU) to rectify a current non-conforming office building (built in 1988) and to accommodate a new equipment storage building. These parcels are located outside of a C4CCMU cluster/ commercial node. This existing commercial node was created to accommodate several commercial uses in the area. When the application went before the Planning Commission, staff recommended that the parcels be rezoned to T2 Rural Center (T2RC) and not C4CCMU as T2RC is a more appropriate district for St. Helena Island. For MEMORANDUM Page 25 of 246 Rezoning T2R to T2RC Page 2 of 4 example, C4CCMU could accommodate multi-family at a density of 12 units per acre. This site has a lack of infrastructure to support this intensity of development. In addition, C4CCMU is not consistent with the parcels’ Comprehensive Plan future land use designation of Rural. T2RC would still accommodate rectifying the non-conforming use and the proposed use while maintaining St. Helena Island’s rural character. The applicant and the Planning Commission both agreed that T2RC would be more appropriate. The Planning Commission voted to recommend approval of the request with the condition that the applicant amended the application to T2RC. The applicant has since made those changes. C. ZONING MAP AMENDMENT REVIEW STANDARDS: In determining whether to adopt or deny a proposed Zone Map Amendment, the County Council shall weigh the relevance of and consider whether and the extent to which the proposed amendment: 1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and the purposes of this Development Code; Yes, it is consistent. The T2RC zoning district is consistent with the future land use map; the future land use map designates these parcels as “Rural.” According to Table 1.4.10 of the CDC, zoning district T2RC is consistent with the future land use designation of Rural. 2. Is not in conflict with any provision of this Development Code, or the Code of Ordinances; No, it is not in conflict. The T2RC district is listed in Table 1.4.10 as a zoning district that implements the Rural future land use designation. 3. Addresses a demonstrated community need; n/a Page 26 of 246 Rezoning T2R to T2RC Page 3 of 4 4. Is required by changed conditions; No, it is not. 5. Is compatible with existing and proposed uses surrounding the land subject to the application, and is the appropriate zone and uses for the land; Yes, T2RC is a compatible fit for the surrounding area. T2RC permits the applicant’s proposed use while maintaining the rural character of St. Helena Island. 6. Would not adversely affect nearby lands; No, the proposed zoning district and lot sizes would not accommodate a use that would disrupt the rural character. 7. Would result in a logical and orderly development pattern; See 5 and 6. 8. Would not result in adverse impacts on the natural environment – including, but not limited to, water, air, noise, stormwater management, wildlife, vegetation, wetlands, and the natural functioning of the environment: Any development on the site would be required to adhere to the natural resource protection, tree protection, wetland protection, and stormwater standards in the Community Development Code and the Stormwater BMP Manual. 9. Would result in development that is adequately served by public facilities (e.g.. streets, potable water, sewerage, stormwater management, solid waste collection and disposal, schools, parks, police, and fire and emergency medical facilities: Yes, T2RC is a low intensity mixed-use district. D. STAFF RECOMMENDATION: Staff recommends approval of the rezoning to T2RC as it is deemed most appropriate for the area. T2RC would still accommodate rectifying the non- conforming use and the proposed use while maintaining St. Helena Island’s rural character. E. PLANNING COMMISSION RECOMMENDATION: At their June 1, 2026 meeting, the Planning Commission voted unanimously to recommend approval of the request with the condition that the applicant amend the application to T2RC. F. ATTACHMENTS: • Zoning Map (existing and proposed) • Application Page 27 of 246 Rezoning T2R to T2RC Page 4 of 4 Page 28 of 246 Harvey & Battey, P.A. | P.O. Drawer 1107 | 1001 Craven Street | Beaufort, SC 29901-1107 (843) 524-3109 | (843) 524-6973 Fax | www.harveyandbattey.com July 20, 2026 Via Email Kristen Forbus, MPA, AICP Long Range Planner Beaufort County Government 100 Ribaut Road, Room 115 Beaufort, SC 29901 RE: Map Amendment R300 012 000 0129 0000 and R300 012 000 047A 0000 Dear Kristen: I write to confirm our client’s intent to amend the pending rezoning request from C4MMCU to T2RC for the following parcels: R300 012 000 0129 0000 and R300 012 000 047A 0000. Our initial Zoning Map Amendment application sought to rezone the subject property from T2R (Rural) to C4MMCU (Community Center Mixed-Use) for three primary reasons: 1. Our client intends to construct an office building and auxiliary equipment storage buildings behind the office to support his local roofing company on the portion of the property located on Wards Landing Road. In addition, on an interior parcel an office building has existed and been used since 1988 and has continued as a legal nonconforming commercial use. 2. The properties adjacent to the subject property on both sides of the street are zoned C4MMCU. The intent was to align the subject property’s zoning with the surrounding commercial zoning, and that the fifty -foot-wide roadway would not defeat zoning contiguity. 3. Under the Comprehensive Plan, this area is one of only two locations on Saint Helena Island designated for future commercial growth that is consistent with its historical commercial use at a rural crossroads. After receiving the Staff Report recommending T2RC (Rural Center) zoning, and following discussions with Staff, it became clear that T2RC would both advance the County’s goal Page 29 of 246 Harvey & Battey, P.A. | P.O. Drawer 1107 | 1001 Craven Street | Beaufort, SC 29901-1107 (843) 524-3109 | (843) 524-6973 Fax | www.harveyandbattey.com of maintaining compatibility with surrounding uses and meet our client’s intended use for the property. Staff also explained that when C4MMCU was applied to the nearby parcels, it was the only available zoning option at that time. We appreciate the time and assistance Staff has provided and its willingness to accommodate our amended application. We look forward to continuing to work with the County on this matter. If you have any questions, please feel free to contact me. Sincerely, Kevin E. Dukes KED/cbk Page 30 of 246 1. Is consistent with and furthers the goals and policies of the Comprehensive Plan and the purposes of this Development Code. The proposed map amendment is consistent with and furthers the goals and policies of the Beaufort County 2040 Comprehensive Plan (the “Comp. Plan”) and the purposes of the Community Development Code (“CDC”). The request is to rezone the subject property (the “Property”) from T2R Rural to T2 Rural Center . The proposed amendment places the Property into a zoning classification that better reflects its existing and intended use as an office/shop and warehouse/storage location for an established local business. The Comp. Plan recognizes that Beaufort County must balance rural preservation, environmental protection, economic opportunity, access to jobs and services, and orderly growth. The Comp. Plan states that growth can occur together with resource protection a nd resilience planning, and that growth “does not need to be an either -or decision.” This request advances that balance by allowing a limited, local business use in one of the limited commercial/growth areas on St. Helena Island, while avoiding incompatible forms of development. The Property is located near the Sea Island Parkway and Seaside Road/Wards Landing Road crossroads, one of the limited areas on St. Helena Island where commercial activity is appropriate. The Comp. Plan recognizes the importance of locating jobs near where people live and supporting businesses that fit their location. This request directly supports those policies. C. E. Bourne & Co., Inc. (the “Applicant”) is a sixth- generation, family- owned South Carolina business dating back to 1906, has owned property in Beaufort County since 1999, and has continuously operated in Beaufort County for more than two decades. The Applicant employs Beaufort County residents and provides valuable services to both the public and private sectors of Beaufort County’s economy. 2. Is not in conflict with any provision of this Development Code, or the Code of Ordinances. The proposed amendment is not in conflict with the CDC or the Beaufort County Code of Ordinances. CDC Section 7.3.40 provides the process for amending the Official Zoning Map when the public necessity, general welfare, the Comp. Plan, or appropriate land use practices justify or require doing so. The T2RC standard allows general office and uses of 10,000 square feet or less and are designed for smaller commercial and office uses including garage bays for equipment to be housed and for lay down yards. The proposed use as T2RC is consistent with adjacent properties in terms of commercial properties across Wards Landing Road and HWY 21, making the requested classification consistent with the nearby zoning pattern. Finally, this location is designated under the Comp. Plan as a growth/commercial area. 3. Addresses a demonstrated community need. The proposed amendment addresses a demonstrated community need by supporting local employment, local contractor services, public infrastructure maintenance, and community oriented business activity on St. Helena Island and within Beaufort County. Page 31 of 246 The Applicant is not an outside company entering the Beaufort County market. It has operated in Beaufort County for more than two decades, its Beaufort County employees reside locally, and the company has reroofed more than 600 homes within Beaufort County. The company also performs roofing, reroofing, and maintenance work throughout Beaufort County, including Beaufort, Fripp Island, Harbor Island, and Dataw Island. The business also serves an important public and institutional function. The Applicant has maintained a continuous maintenance contract with the Beaufort County School District since 2008 and has performed work on numerous school facilities, including St. Helena Early Childhood Center, Mossy Oaks Elementary School, Lady’s Island Elementary School, Whale Branch Middle School, Bluffton High School, and others. It has also completed reroofing work on Beaufort County government buildings, including the Beaufort County Administration Building, Beaufort County Detention Center, and other public facilities. The rezoning therefore addresses more than a private business need. It supports a local employer that provides essential roofing and maintenance services to homes, schools, county facilities, and public institutions. The relocation closer to town will impr ove response times for public school and county maintenance needs, reduce travel distances for employees, improve operational efficiency, decrease fuel usage, and reduce the traffic burdens. 4. Is required by changed conditions. The amendment is justified by changed conditions and by the need to correct a zoning classification that no longer accurately reflects the property’s existing conditions, surrounding zoning pattern, or the County’s planning framework for this area. The T2R district is intended to preserve the rural character of Beaufort County and applies to sparsely settled lands, open or cultivated areas, large lot residential uses, farms, woodland, grasslands, trails, and open space. While that classification is a ppropriate for many areas of St. Helena Island, it does not accurately reflect the existing condition or intended use of this particular property, which is located near a commercial crossroads along Sea Island Parkway, has been used historically for commercial office purposes, and is designated in the Comp. Plan as a location for commercial growth. When the CDC replaced the prior Zoning and Development Standards Ordinance (“ZDSO”), this area was recognized as an area appropriate for limited commercial activity. However, the Property was placed in the T2R district, which created a legal nonconformity for the existing commercial office use on a portion of the Property. The requested T2RC is a more appropriate classification because it reflects the Property’s actual and intended use while maintaining compatibility with adjacent commercial uses. 5. Is compatible with existing and proposed uses surrounding the land subject to the application, and is the appropriate zone and uses for the land. Page 32 of 246 The requested T2RC zoning is compatible with existing and proposed uses surrounding the Property and is the appropriate zoning classification for the land. The Property is located near an established commercial crossroads on Sea Island Parkway near Seaside Road and Wards Landing Road. Adjacent property across Wards Landing Road is already zoned for commercial use, making the requested amendment consistent with the immediately surrounding zoning pattern. T2RC is also an appropriate district because it is not intended for strip development, highway-service commercial activity, or high -intensity industrial use. The T2RC is expressly intended for smaller retail, service, and office uses serving the surrounding neighborhood, with standards designed to ensure that development blends with surrounding areas and does not threaten community character. The proposed use is compatible with that purpose. The Applicant is a professional roofing contractor that operates during standard business hours with structured logistics, scheduled material deliveries, and managed storage practices. The Applicant is not a heavy industrial manufacturer and its operations are orderly, code-compliant, and consistent with light commercial or contractor service uses commonly approved within similar zoning classifications. The requested zoning therefore provides an appropriate transition between rural areas and a recognized neighborhood commercial node. 6. Would not adversely impact nearby lands. The proposed amendment would not adversely impact nearby lands. The Property is already used for a similar commercial purpose, although presently as a legal nonconformity. Rezoning the Property to T2RC would bring the zoning into better alignment with the existing and proposed use rather than introduce a new or incompatible land use pattern. The proposed use is also limited and operationally responsible. The Applicant is not proposing heavy manufacturing or speculative commercial development. The company is seeking to relocate its existing Beaufort County office and warehouse to better serve the County. It operates with scheduled deliveries, managed storage practices, and standard business operations. The nearby zoning pattern further supports the request because commercial zoning exists across Wards Landing Road. This amendment would therefore create a more consistent zoning pattern at the commercial crossroads. Future development or redevelopment will remain subject to site design, buffering, access, parking, lighting, signage, a nd stormwater. These standards provide additional protection for nearby lands and ensure compatibility. 7. Would result in a logical and orderly development pattern. The proposed amendment would result in a logical and orderly development pattern. It places a limited commercial/mixed-use zoning classification at an existing commercial crossroads along a primary transportation corridor, rather than scattering commercial uses into rural or undeveloped areas of St. Helena Island. Page 33 of 246 The Comp. Plan emphasizes that growth should be directed to this specific location based on environmental, economic, cultural, social, historical, and infrastructure considerations. This request follows that approach by locating limited commercial activity where commercial activity already exists, where adjacent zoning is compatible, and where the Property has historically been used for commercial office purposes. The amendment also cures an existing nonconformity and aligns the Property with the surrounding development pattern. Rather than expanding commercial zoning into an unrelated rural area, the request reinforces a recognized and designated commercial node an d allows a reasonable local business use in a district designed for local commercial activity. The proposed relocation also supports orderly public service and infrastructure maintenance. The Applicant provides roofing and maintenance services to homes, schools, county buildings, and public institutions throughout Beaufort County. A more centrally located office and warehouse will improve response times, reduce unnecessary travel, and support more efficient service to the County. 8. Would not result in adverse impacts on the natural environment —including water, air, noise, stormwater management, wildlife, vegetation, wetlands, and the natural functioning of the environment. The proposed amendment would not result in adverse impacts on the natural environment. The proposed use is an office building with shop/storage behind it for a local business. The use is limited in scale and is located on Property already used for a similar commercial purpose. The request does not seek to increase residential density in a rural area or extend development into environmentally sensitive lands. Any future site improvements will be required to comply with applicable stormwater, drainage, tree protection, buffering, parking, access, and environmental standards. Since the Property is located within an existing commercial crossroads and is proposed for a modest local business use, the amendment is not expected to create adverse impacts to water, air, noise, wildlife, vegetation, wetlands, stormwater management, or the natural functioning of the environment. The Property is located in close proximity to existing services and accomplishes the County’s goal of providing jobs close to where people live without adversely impacting the community or environment. 9. Would result in development that is adequately served by public facilities. The proposed amendment would result in development that is adequately served by public facilities. The Property is located along Sea Island Parkway, a primary transportation corridor on St. Helena Island, at or near an existing crossroads. The Property has access to available water, existing road infrastructure, solid waste service, and emergency services, and the proposed office/shop use is not expected to create a need for significant new public facilities or services. Page 34 of 246 The amendment does not propose a large residential subdivision, intensive commercial center, or use that would materially increase demand on schools, parks, police, fire, EMS, or other public facilities. Instead, it allows continued and improved use of an existing commercial property in a location where commercial activity is already present and planned. The proposed rezoning will also support public facilities rather than burden them. The Applicant has maintained a continuous maintenance contract with the Beaufort County School District since 2008 and has performed work on numerous school facilities throughout the County. The Applicant has also performed reroofing work on Beaufort County government facilities, including the Beaufort County Administration Building and Beaufort County Detention Center. A more centrally located office and warehouse will improve response time for public school and county maintenance needs and enhance emergency service responsiveness for public facilities. For these reasons, the proposed amendment is adequately served by existing public facilities and will support the efficient maintenance of public infrastructure within Beaufort County. Page 35 of 246 BEAUFORT COUNTY, SOUTH CAROLINA COMMUNITY DEVELOPMENT CODE (CDC) ZONING MAP AMENDMENT TO: Beaufort County Council The under signed hereby respectfully requests that the Community Development Code (CDC) be amended as described below: GENE RAL INFORMATION OWNER’S NAME(S)*: MAILING ADDRESS: PHONE: EMAIL: NAME OF APPLICANT (IF DIFFERENT FROM OWNER): MAILING ADDRESS: PHONE: EMAIL: *Only property owners or their authorized representative/agent can sign this application. If there are multiple owners, each property owner must sign an individual application and all applications must be submitted simultaneously. If a business entity is the owner, the authorized representative/agent of the business must attach: 1- a copy of the power of attorney that gives him the authority to sign for the business, and 2- a copy of the articles of incorporation that lists the names of all the owners of the business. PROP ERTY INFORMATION PARCEL NUMBER(S) (TMS): ADDRESS OF SUBJECT PARCEL(S): SIZE OF SUBJECT PROPERTY: PRESENT ZONING CLASSIFICATION (AND ANY APPLICABLE OVERLAY DISTRICTS): T2R with CPO REQUESTED ZONING CLASSIFICATION: REASON FOR REQUEST: ATTACH TRAFFIC IMPACT ANALYSIS (TIA) (IF APPLICABLE)** **The applicant should address and attach a Traffic Impact Analysis per Division 6.3.20(D) if a particular project or zoning district may result in a development that generates 50 trips during the peak hour or will change the level of service of the affected street. TSB Properties of Greenwood LLC P.O. Box 614, Greenwood, SC 26948 (864) 910-1361 ted@cebourne.com Kevin E. Dukes P.O. Box 1107, Beaufort, SC 29901 (843) 524-3109 kdukes@harveyandbattey.com R300 012 000 0129 0000 and R300 012 000 047A 0000 1782 and 1788 Sea Island Parkway 1.4 Acres T2RC with CPO Improvement as an office building with shop for local business. Conformity with of current legal nonconformities and the Comprehensive Plan. Page 36 of 246 It i s understood by the undersigned that while this application will be carefully reviewed and considered, the burden of proof for the proposed rezoning rests with the owner. Signature of Owner Date UPON RECEIPT OF APPLICATIONS, THE STAFF HAS THREE (3) WORKDAYS TO REVIEW ALL APPLICATIONS FOR COMPLETENESS. THE COMPLETED APPLICATIONS WILL BE REVIEWED FIRST BY THE BEAUFORT COUNTY PLANNING COMMISSION SUBCOMMITTEE RESPONSIBLE FOR THE AREA WHERE YOUR PROPERTY IS LOCATED. MEETING SCHEDULES ARE LISTED ON THE APPLICATION PROCESS (ATTACHED). COMPLETE APPLICATIONS MUST BE SUBMITTED BY NOON FIRST MONDAY OF THE MONTH PRIOR TO THE APPLICABLE PLANNING COMMISSION MEETING DATE. SUBMISSION OF APPLICATION. ALL APPLICATIONS SHALL BE SUBMITTED TO THE APPROPRIATE COUNTY DEPARTMENT. NO APPLICATION WILL BE ACCEPTED UNLESS ACCOMPANIED BY THE REQUIRED FEE. APPLICATIONS RECEIVED BEFORE 12:00 P.M. SHALL BE DATED THE SAME WORKING DAY. APPLICATIONS RECEIVED AFTER 12:00 P.M. SHALL BE DATED THE NEXT WORKING DAY. FOR MAP AMENDMENT REQUESTS, THE PLANNING OFFICE WILL POST A NOTICE ON THE AFFECTED PROPERTY AS OUTLINED IN DIV. 7.4.50 OF THE COMMUNITY DEVELOPMENT CODE. CONTACT THE PLANNING DEPARTMENT AT (843) 255-2140 FOR EXACT APPLICATION FEES. July 20, 2026 Page 37 of 246 THE FOLLOWING MUST BE ADDRESSED ON A SEPARATE SHEET AND ATTACHED Se ction 7.3.40 Zone Map Amendment (Rezoning) 1. Is consistent with and furthers the goals, and policies of the Comprehensive Plan and the purposes of t his Development Code. In areas of new development, a finding of consistency with the Comprehensive Plan shall be considered to meet the standards below, unless compelling evidence demonstrates the pr oposed amendment would threaten the public health, safety, and welfare if the land subject to the amendment is classified to be consistent with the Comprehensive Plan: 2. Is not in conflict with any provision of this Development Code, or the Code of Ordinances: 3. Addresses a demonstrated community need: 4. Is required by changed conditions: 5. Is compatible with existing and proposed uses surrounding the land subject to the application, and is the appropriate zone and uses for the land: 6. Would not adversely impact nearby lands: 7. Would result in a logical and orderly development pattern: 8. Would not result in adverse impacts on the natural environment—including, but not limited to, water, a ir, noise, storm water management, wildlife, vegetation, wetlands, and the natural functioning of the environment: 9. Would result in development that is adequately served by public facilities (e.g., streets, potable water, sewerage, stormwater management, solid waste collection and disposal, schools, parks, police, and fire and emergency medical facilities): Page 38 of 246 BEAUFORT COUNTY, SOUTH CAROLINA PROPOSED COMMUNITY DEVELOPMENT CODE (CDC) ZONING MAP AMENDMENT APPLICATION PROCESS Y our application is subject to either the Zoning Map Amendment (Rezoning) Procedure per Division 7.3.40(C). Y our application will be heard by the following groups before final determination by County Council occurs (approximately five to six separate hearings depending on the property location) as indicated below: 1. M etropolitan Planning Commission (a subcommittee of the County Planning Commission -- for properties on Port Royal Island including Burton, Grays Hill, Seabrook, and Shell Point areas; and Lady’s Island, including Coosaw Island—map amendment only): Generally Third (3 rd) Monday of each month, at 5:30 p.m. in the Beaufort City Hall Council Chambers, 1911 Boundary Street, Beaufort, SC 29902. 2. T he Beaufort County Planning Commission: First (1st) Monday of each month, at 6:00 p.m. in the County Council Chambers, Administration Building, 100 Ribaut Road, Beaufort, SC. If the first Monday is a County holiday or a County Council meeting day, the meeting will be held on the first Thursday of the month. 3. C ommunity Service and Land Use Committee of Beaufort County Council: generally Second (2nd) Monday of each month, usually at 3:00 p.m. in the Executive Conference Room, Administration Building, 100 Ribaut Road, Beaufort, SC. 4 -6. County Council: Second (2nd) and Fourth (4th) Mondays of each month, at 5:00 p.m. usually in the County Council Chambers, Administration Building, 100 Ribaut Road, Beaufort, SC. a. First (1 st) Reading b. Second (2 nd) Reading c. Third (3rd) and Final Reading (Public Hearing generally prior to final reading) Page 39 of 246 ORDINANCE 2026/________ AN ORDINANCE AMENDING THE ZONING MAP FOR 1.4 ACRES (R300 012 000 0129 0000, R300 012 000 047A 0000) FROM T2R TO T2RC WHEREAS, the properties located at 1782 and 1788 Sea Island Parkway (R300 012 000 0129 0000, R300 012 000 047A 0000) are currently zoned T2 Rural; and WHEREAS, the owners of the properties have requested to change the zoning to T2 Rural Center to rectify a current non-conforming office and to accommodate the use of an auxiliary equipment storage building; and WHEREAS, the Beaufort County Comprehensive Plan Future Land Use designation is Rural which accommodates the proposed zoning district; and WHEREAS, the parcels adjoin an existing commercial node of St. Helena Island; and WHEREAS, the Beaufort County Planning Commission considered the request on June 1, 2026, voting 8-0 to recommend that County Council approve the request to rezone the properties to T2RC; and WHEREAS, County Council now wishes to amend the zoning map to change the zoning of the properties from T2 Rural to T2 Rural Center. NOW, THEREFORE be it ordained by County Council in a meeting duly assembled as follows: To adopt an ordinance amending the zoning map for 1.4 acres (R300 012 000 0129 0000, R300 012 000 047A 0000) located at 1782 and 1788 Sea Island Parkway from T2 Rural to T2 Rural Center. Ordained this ___ day of ______________, 2026 _________________________ Alice Howard, Chair ___________________________ Sarah Brock, Clerk to Council Page 40 of 246 Page 41 of 246 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: AN ORDINANCE TO AMEND ORDINANCE 2026/29 TO AUTHORIZE THE TRANSFER OF FUNDS. MEETING NAME AND DATE: Finance, Administration and Economic Development Committee August 17, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Council review and discuss the three options provided to them and provide a recommendation for approval. PRESENTER INFORMATION: Michael Moore, County Administrator (10 minutes) ITEM BACKGROUND: Language authorizing the transfer of funds was removed from the FY27 Budget Ordinance. This means that no movement of funds between departments or within the CIP funds can occur without Council approval. There are currently several CIP projects that are on hold until additional funding can be approved. There are many projects that are complete with project savings available to provide funding for these projects. Staff have provided three options that would restore authority to approve budget transfers for the County Administrator or CFO. The approval of one of these options would allow staff to continue work on these projects. FISCAL IMPACT: N/A APPROVAL HISTORY: N/A Page 42 of 246 ORDINANCE 2026/ AN ORDINANCE TO AMEND BEAUFORT COUNTY’S BUDGET ORDINANCE FOR FISCAL YEAR 2027 (ORDINANCE 2026/29) TO AUTHORIZE THE TRANSFER OF FUNDS. WHEREAS, the Beaufort County Council (“Council”), pursuant to the authority granted by the Constitution of the State of South Carolina and the General Assembly of the State of South Carolina, has the authority to provide for the issuance and sale of general obligation bonds; and WHEREAS, on June 22, 2026, County Council adopted Ordinance 2026/29, which set the County’s FY2027 budget and associated expenditures; and WHEREAS, a motion was made to amend the proposed FY2027 budget ordinance at the County Council meeting on May 26, 2026, to remove language from section VIII of the ordinance that would authorize the County Administrator to transfer funds; and WHEREAS, County Council desires to amend the FY2027 Budget Ordinance 2026/29 to authorize the County Administrator with the recommendation of the CFO, to transfer appropriations between departments (from one department to another) and within the County’s General Fund, Capital Projects Fund, and Capital Improvements Fund, excluding all Enterprise Funds, provided a single transfer does not exceed $200,000, the transfer does not increase the total overall budget of the fund, the transfer does not establish a new capital project, and the transfer does not eliminate or materially change the scope, purpose, or intended outcome of a project; and NOW, THEREFORE, BE IT ORDAINED BY BEAUFORT COUNTY COUNCIL that the FY2027 Beaufort County Budget Ordinance 2026/29 is amended to authorize the County Administrator, when it is in the best interest of the individual County departments or agencies and with the recommendation of the CFO, to transfer appropriations between departments (from one department to another). The County Administrator is permitted to transfer appropriations within the County’s General Fund, Capital Projects Fund, and Capital Improvements Fund, excluding all Enterprise Funds, as long as it: a) Does not exceed $200,000 in a single transfer b) Does not increase the total overall budget of the fund c) Does not establish a new capital project d) Does not eliminate or materially change the scope, purpose, or intended outcome of a project Done this ___ day of ________ 2026. COUNTY COUNCIL OF BEAUFORT COUNTY By: ___________________________________ Alice Howard, Chairman ATTEST: ________________________ Sarah Brock, Clerk to Council Page 43 of 246 Options: 1. Restore original language: The County Administrator or the CFO is permitted, when it is in the best interest of the individual County departments or agencies, to transfer appropriations between departments (from one department to another department) and between the County’s General Fund, Capital Projects Fund and Capital Improvements Fund (from one Fund to another Fund) up to $150,000. 2. Transfers between departments approved upon authorization from the Administrator/CFO. Transfers within CIP funds conditionally authorized: The County Administrator or the CFO is permitted, when it is in the best interest of the individual County departments or agencies, to transfer appropriations between departments (from one department to another). The County Administrator or the CFO is permitted to transfer appropriations within the County’s General Fund, Capital Projects Fund, and Capital Improvements Fund as long as it: a) Does not exceed $200,000 in a single transfer. b) Does not increase the total overall budget of the fund. c) Does not establish a new capital project. d) Does not eliminate or materially change the scope, purpose, or intended outcome of a project. 3. Provide full authority for Administrator/CFO to authorize transfers without a threshold limit: The County Administrator or the CFO is permitted, when it is in the best interest of the individual County departments or agencies, to transfer appropriations between departments (from one department to another department) and between and within the County’s General Fund, Capital Projects Fund and Capital Improvements Fund. Page 44 of 246 Summary of Findings: Administrator/CFO has full authorization on transfers with no $ limit Administrator/CFO has authorization on transfers within a defined threshold Nothing specifically noted in a budget ordinance Dorchester County Jasper County Richland County Charleston County Horry County Lexington County Greenville County Colleton County Aiken County Dorchester County • SECTION VII: Each department head is permitted, subject to the County Administrator's (or his designee's) approval, to transfer appropriation(s) between object classification codes within that department. Transfers between objects 11-01 through 26-01 (personnel codes) must be approved by the County Administrator or their designee; transfers from objects 11-01 and 26- 01 to other object codes are not permitted under any circumstances without the approval of County Council. Transfers from objects 33-03 (autopsies & postmortems), 53-02 (cell phones) and 62-02 (fuel) are not permitted without the approval of the County Administrator. The County Administrator or CFO is permitted, when it is in the best interest of the individual County departments or agencies, to transfer appropriations between departments (from one department to another department) and between the County's General Fund, Capital Projects Fund, Special Revenue Funds, and Capital Improvements Fund (from one Fund to another Fund). Charleston County • Overall: Administrator has almost executive authority in transfers • SECTION 9: Organization units are bound to the appropriated disbursements as defined in SECTION 2 and delineated in the Fiscal Year 2027 Approved Budget Detail document. o (a) For contributions, the organizational budgets are bound by “object code.” o (b) The County Administrator, or his designated representative, is hereby authorized to effect transfers between organizational units. The County Administrator is also authorized to further restrict budget transfers within major expenditure categories. o (c) County Council may by resolution effect transfers from Council's Contingency to organizational units. Page 45 of 246 o (d) County Council may by amendment to this Ordinance adjust appropriation transactions affecting fund totals, other than those authorized elsewhere within this Ordinance. o (e) For personnel costs, the organizational budgets are bound at the total of personnel costs. Funds cannot be transferred into or out of personnel. Greenville County • Administrator has executive authority • SECTION 4: LINE ITEM ACCOUNTS ESTABLISHED. All line item accounts as set forth in the FY2027 Budget Proposal, as adjusted and established by the aforementioned appropriation, are herein established and incorporated as if fully set forth and shall be expended, transferred, or supplemented pursuant to the Greenville County Code. The County Administrator is authorized to transfer funds between departments to make necessary changes and adjustments to reflect Council amendments to the proposed budget. Richland County • Nothing specifically noted in budget ordinance Jasper County • Same language as our FY26 ordinance but transfer limit is smaller: Colleton County • As long as the overall budget is not increased, Administrator has full authority • SECTION 9. TRANSFERS VALIDATED All duly authorized transfers of funds heretofore made from one account to another, or from one fund to another during Fiscal Year 2025-2026, are hereby approved, and the Administrator shall be authorized to implement and fulfill the same transfer authority in Fiscal Year 2026-2027 so long as the Page 46 of 246 transfer does not exceed the amount budgeted therefore or violate any restrictions associated with the expenditure of monies from such fund. Horry County • Allowed up to $100,000 which then needs a resolution • SECTION 36. Any budget transfer from the Capital Improvement Plan (CIP) Inflation or General Contingency that exceeds $100,000 must first be approved by County Council through a resolution before the transfer is completed. These resolutions are not required to first go through a Council Committee. Lexington County • Nothing specifically noted in budget ordinance Aiken County • Generally allowed with approval from Administrator • Generally, transfers between object categories are authorized unless restricted herein, or elsewhere by ordinance or administrative directive. Budget transfers involving the Personnel Services object categories of a department's budget must be requested in writing by the supervising department head, and approved in writing by the County Administrator or his designee. Transfers out of Personnel Services object categories are prohibited except for pooled payments for health insurance, taxes, worker compensation, and similar purposes, or personnel position reassignments for efficiency or emergencies as authorized by the County Administrator. Transfers out of the Road Maintenance Fund are prohibited, except as approved herein for interest and indirect cost payments. Departments are authorized to transfer funds within operating accounts with the approval of the County Administrator or his designee. Page 47 of 246 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: 2026/44: AN ORDINANCE AMENDING THE FY2027 BUDGET FOR STORMWATER UTILITY OPERATIONS, CARRYOVER PURCHASE ORDERS, ACCOMMODATIONS & HOSPITALITY TAX PROJECTS, AND FACILITY OPERATIONS. (PUBLIC HEARING) MEETING NAME AND DATE: County Council September 28, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval of the budget amendment ordinance to properly recognize the applicable fund balances and appropriate the funds necessary for the Stormwater Utility operational budget, the identified carryover Purchase Orders, & Facilities Operations. PRESENTER INFORMATION: Sandy Novak, Finance Director, 5 minutes ITEM BACKGROUND: The amendment allocates stormwater funds to finance the Royal Pines Drainage Project and address four ongoing projects for which purchase orders were not correctly entered in the budget process, totaling $7,247,672.28. The details of the transfers are as follows: (1) $3,475,000 from the Stormwater Utility Enterprise Fund for the Stormwater Utility operational budget; and (2) $1,916,589.12 from A-Tax to fund 2 carryover Purchase Orders that were planned in the prior fiscal year but not adequately budgeted in FY2027($642,489.12), support for the Waterfront Park project ($1,000,000), and 15% of A-Tax for to support affordable housing ($274,100) (3) $1,000,000 from H-Tax to support the Waterfront Park project (4) $539,900 from Parks & Rec Impact Fees to fund a carryover Purchase Orders that was planned in the prior fiscal year but not adequately budgeted in FY2027 (5) $62,914.06 in Airport Funds to fund a carryover Purchase Orders that was planned in the prior fiscal year but not adequately budgeted in FY2027 and (6) $253,269.10 from the General Fund fund balance for the HVAC replacement at the Animal Shelter. FISCAL IMPACT: The amendment increases FY2027 appropriations by $7,247,672.28. The amendment does not rely on a new tax or fee; the appropriations are funded from existing fund balances in the Stormwater Utility Fund, Local Accommodations Tax Fund, Parks and Recreation Impact Fee Fund, Hilton Head Island Airport Enterprise Fund and the General Fund fund balance. Funding breakdown: $3,475,000.00 Stormwater Utility Fund balance; $1,916,589.12 Local A-Tax fund balance; $1,000,000 H-Tax fund balance; $539,900.00 Parks and Recreation Impact Fee fund balance; $62,914.06 Hilton Head Island Airport fund balance; and $253,269.10 from General Fund fund balance. APPROVAL HISTORY: The vote at Finance, Administration, and Economic Development Committee Meeting on August 17, 2026 - 9:0 Page 48 of 246 The vote at First Reading on September 14, 2026 - 10:0 Page 49 of 246 ORDINANCE 2026/____ AN ORDINANCE TO AMEND BEAUFORT COUNTY’S BUDGET ORDINANCE FOR FISCAL YEAR 2027 (ORDINANCE NO. 2026/29) TO AMEND SECTION III, COUNTY OPERATIONS REVENUES, AND SECTION IV, COUNTY OPERATIONS APPROPRIATION TO APPROPRIATE FUND BALANCE FOR STORMWATER UTILITY OPERATIONS, CERTAIN GENERAL FUND CARRYOVER PURCHASE ORDERS, AND FACILITY OPERATIONS WHEREAS, the Beaufort County Council, pursuant to the authority granted by the Constitution of the State of South Carolina and the General Assembly of the State of South Carolina, has the authority to prepare an annual budget for all Beaufort County Departments, Agencies, Elected Officials, Boards and Commissions; and WHEREAS, Beaufort County Council adopted Ordinance 2026/29 on June 22, 2025, which set the County’s FY2027 budget and associated expenditures; and WHEREAS, the County has identified a need to appropriate $3,475,000 from the Stormwater Utility Fund balance, an Enterprise Fund, to the Stormwater Utility operational budget for FY2027; and WHEREAS, the County has further identified four carryover Purchase Orders for projects that were planned but were not appropriately budgeted in FY2027 and therefore require an appropriation from Local 3% Accommodations Tax Special Revenue Fund fund balance, Parks and Recreation Impact Fees fund balance, and HHI Airport Enterprise Fund fund balance; and WHEREAS, the required overall appropriations for these carryover Purchase Orders totals $1,245,303.18 and consists of the projects and amounts identified in Exhibit A attached hereto and incorporated herein by reference; and WHEREAS, the County has a need to appropriate $253,269.10 from the General Fund fund balance to repair a failing HVAC at the Animal Shelter from funds recently received via a recent settlement involving the impaired equipment; and WHEREAS, the City of Beaufort has requested Local 3% Accommodations and Hospitality Tax for a project on at the Waterfront Park and the County desires to provide $1,000,000 of A-Tax funding and $1,000,000 of H-Tax funding for the project; and WHEREAS, The County desires to use 15% of Local 3% Accommodations Tax for Affordable Workforce Housing in the amount of $274,100; and WHEREAS, the combined impact of this budget amendment is to increase FY2027 appropriations by $7,247,672.28, consisting of $3,475,000 from Stormwater Utility Fund balance $1,916,589.12 from Local 3% Accommodations Tax fund balance, $1,000,000 from H-Tax fund balance, $539,900 from Parks and Recreation Impact Fund, $62,914.06 from Airports, and $253,269.10 from General Fund fund balance; and WHEREAS, in the interest of good accounting practices and transparency in the budget process, it is beneficial and necessary to amend the budget to reflect the changes as set forth herein. Page 50 of 246 NOW, THEREFORE, BE IT ORDAINED BY BEAUFORT COUNTY COUNCIL that the FY2027 Beaufort County Budget Ordinance 2026/29 is hereby amended as follows: SECTION III. COUNTY OPERATIONS REVENUES A. Stormwater Utility Fund. The Stormwater Utility Fund, an Enterprise Fund, is amended to recognize and appropriate $3,475,000 from Stormwater Utility Fund balance for the Stormwater Utility operational budget. B. Local 3% Accommodation Tax. Local 3% Accommodations Tax revenues are amended to recognize and appropriate $642,489.12 from fund balance to support carryover Purchase Orders identified in “Exhibit A”, $1,000,000 from fund balance to support the Waterfront Park project, and $274,100 from fund balance to support workforce housing for a total of $1,916,589.12. C. Local Hospitality Tax. H-Tax fund budget is amended to recognize and appropriate $1,000,000 for the Waterfront Park project from fund balance. D. Parks and Recreation Impact fees. Impact fees revenues are amended to recognize and appropriate $539,900 from fund balance to support carryover Purchase Orders identified in “Exhibit A”. E. Airports Fund. Airport revenues are amended to recognize and appropriate $62,914.06 from Airports fund balance to support carryover Purchase Orders identified in “Exhibit A”. F. General Fund Fund Balance. General fund fund balance is amended to reorganize and appropriate $253,269.10 to support the HVAC replacement at the Animal Shelter facility. The details of line-item accounts for these funds are hereby adopted as part of this Ordinance. SECTION IV. COUNTY OPERATIONS APPROPRIATION A. Stormwater Utility Fund (Fund 5025). The Stormwater Utility operational appropriation is increased by $3,475,000, funded from Stormwater Utility Fund balance. B. Local 3% Accommodation Tax Fund (Fund 2001) is increased by $1,916,589.12 from fund balance. C. Local Hospitality Tax (Fund 2002) is increased by $1,000,000 from fund balance. D. Parks and Recreation Impact fees (Fund 2650) are increased by $539,900 from fund balance. E. Airports (Fund 5102) is increased by $62,914.06 from fund balance. F. Facilities Operations (Fund 1000) is increased by $253,269.10 from General Fund fund balance. Page 51 of 246 EXHIBIT A FY2026 CARRYOVER PURCHASE ORDERS Project Funding Source Purchase Order # Amount Alljoy Boat Landing Local 3% A-Tax 270328 $397,989.12 Broad River Fishing Pier Local 3% A-Tax 270333 $244,500.00 BRACE Project Lighting P&R Impact Fees 270308 $539,900.00 SCAC Grant HHI Airport $62,914.06 Total Appropriations $1,245,303.18 Done this ___ day of __________ 2026. COUNTY COUNCIL OF BEAUFORT COUNTY By: ___________________________________ Alice Howard, Chairman ATTEST: ________________________ Sarah Brock, Clerk to Council First Reading: Public Reading: Second Reading: Third Reading: Page 52 of 246 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: 2026/45: AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE NECESSARY DOCUMENTS AND PROVIDE FUNDING FOR THE PURCHASE OF REAL PROPERTY IDENTIFIED AS TMS NOS. R200- 010-000-0340-0000, R200-010-000-021G-0000, AND R200-010-000-0446-0000 FROM BRICKYARD COMMONS, LLC FOR THE ROYAL PINES STORMWATER PROJECT IN THE AMOUNT OF $3,475,000.(PUBLIC HEARING) MEETING NAME AND DATE: County Council September 28, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends that an ordinance authorizing the County Administrator to execute the necessary documents and provide funding for the purchase of the three identified parcels and the associated fixed-price project agreement with Brickyard Commons, LLC, subject to final legal, procurement, risk, title, environmental, and funding review. PRESENTER INFORMATION: Jared Fralix, Assistant County Administrator ITEM BACKGROUND: Beaufort County has identified the southern Royal Pines area as an area of known drainage concern, and the area was evaluated as part of the Northern Lady's Island Drainage Study completed in May 2024. Last fall, a developer, Brickyard Commons, LLC, approached the County with an unsolicited public-private stormwater concept for this area. An earlier Royal Pines Stormwater Project concept involved a larger and more complex project footprint. After further discussions and County review, the developer submitted a revised fixed-price proposal limited to three parcels currently owned by Brickyard Commons, LLC, totaling approximately 25 acres east of Middle Road. The revised proposal is intended to provide a smaller, more achievable stormwater opportunity while preventing the site from advancing as a potential 75-unit residential development. FISCAL IMPACT: The proposed fixed contract price is $3,475,000, inclusive of the land, design, and permitting work, and the defined construction scope. Funding is anticipated from the Stormwater Utility Fund 5025-90-9020-54500 APPROVAL HISTORY: The vote at the Finance, Administration, and Economic Development Committee meeting on 8/17/2026 - 9:0 The vote at First Reading on September 14, 2026 - 10:0 Page 53 of 246 ORDINANCE 2026/_____ AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE NECESSARY DOCUMENTS AND PROVIDE FUNDING FOR THE PURCHASE OF REAL PROPERTY CONSISTING OF APPROXIMATELY TWENTY-FIVE (25) ACRES IN THE ROYAL PINES AREA OF LADY'S ISLAND, IDENTIFIED AS TMS NOS. R200-010-000-0340- 0000, R200-010-000-021G-0000, AND R200-010-000-0446-0000, FOR THE ROYAL PINES MARSH COURSE STORMWATER PROJECT - PHASE 1 WHEREAS, Beaufort County Council and Beaufort County ("County") is a body politic and political subdivision of the State of South Carolina; and WHEREAS, under SC Code Ann. Sections 4-9-25 and 4-9-30, the County is empowered to act in the interests of public safety and in matters involving the health and welfare of its citizens, and may acquire real property; and WHEREAS, the County has identified drainage and flooding concerns affecting the southern Royal Pines area of Lady's Island, and the area is included within the 2024 Lady's Island Drainage Study, which identifies multiple problematic drainage zones surrounding the proposed project site; and WHEREAS, Brickyard Commons, LLC ("Seller" or "Developer") owns three (3) parcels of real property identified as TMS Nos. R200-010-000-0340-0000, R200-010-000-021G-0000, and R200-010- 000-0446-0000, consisting of approximately twenty-five (25) acres, hereinafter referred to collectively as the "Property" or "Project Site"; and WHEREAS, the County desires to acquire the Property for the Royal Pines Stormwater Project - a best management practice regional stormwater retention facility intended to provide public stormwater benefit to the surrounding community; and WHEREAS, acquisition of the Property will dedicate the Project Site to public stormwater retention purposes and will prevent the Property from being advanced as a potential seventy-five (75) unit residential duplex development that could further affect drainage conditions in the surrounding area; and WHEREAS, the County and Developer have negotiated a proposed Fixed-Price Project Agreement under which Developer would convey the Property to the County and perform the defined design, permitting, and construction obligations for Phase 1 of the Royal Pines Stormwater Project; and WHEREAS, the proposed fixed contract price is Three Million Four Hundred Seventy-Five Thousand Dollars ($3,475,000.00), which is inclusive of conveyance of the Property, design and permitting work, and the defined construction scope, subject to the final terms and conditions of the Fixed-Price Project Agreement; and WHEREAS, under the proposed agreement, Developer would convey fee simple title to the Property to the County upon execution of the agreement and payment of the first installment, subject to temporary retained mineral and excavation rights during construction that must be relinquished to the County upon completion as provided in the agreement; and WHEREAS, the funding for the purchase of the Property and related project obligations will be from the Stormwater Utility (Fund 5025) – Infrastructure, line item 5025-90-9020-54500; and Page 54 of 246 WHEREAS, Beaufort County Council finds that it is in the best interest of the citizens and residents of Beaufort County to purchase the Property for the reasons stated above. NOW, THEREFORE, BE IT ORDAINED by Beaufort County Council, duly assembled, that the County Administrator is authorized to execute the necessary documents to purchase and fund the purchase of the real property identified as TMS Nos. R200-010-000-0340-0000, R200-010-000-021G- 0000, and R200-010-000-0446-0000, and to execute the related Fixed-Price Project Agreement and associated closing, conveyance, funding, and project documents for the Royal Pines Stormwater Project, subject to review and approval as to form by the County Attorney and subject to available and lawfully appropriated funds. Done this ___ day of __________ 2026. COUNTY COUNCIL OF BEAUFORT COUNTY By: ___________________________________ Alice Howard, Chairman ATTEST: ________________________ Sarah Brock, Clerk to Council First Reading: Public Reading: Second Reading: Third Reading: Page 55 of 246 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: 2026/46: AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR OR NEGOTIATING AUTHORITY IN ACCORDANCE WITH RESOLUTIONS 2019/44 AND 2021/20 TO EXECUTE ANY AND ALL NECESSARY DOCUMENTS FOR THE ACCEPTANCE OF RIGHT OF WAY AND/OR TEMPORARY CONSTRUCTION EASEMENT PROPERTIES AS SHOWN ON EXHIBIT A PAGES 1-4 ASSOCIATED WITH THE SIDEWALKS AND MULTI-USE PATHWAYS – SAFE ROUTES TO SCHOOLS AND EXHIBIT A PAGES 5-8 ASSOCIATED WITH THE LADY’S ISLAND CORRIDOR TRAFFIC IMPROVEMENTS.(PUBLIC HEARING) MEETING NAME AND DATE: County Council September 28, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Approval to formalize Right of Way interests for the parcels shown on EXHIBIT A Pages 1-4 associated with the Sidewalks and Multi-use Pathways – Safe Routes to Schools and EXHIBIT A Pages 5-8 associated with the Lady’s Island Corridor Traffic Improvements PRESENTER INFORMATION: Bryan Bauer PE, ENV SP, Director of Engineering (5 Minutes) ITEM BACKGROUND: Per Resolution 2019/44 for the 2018 One Percent (1%) Transportation Sales and Use Tax which states “County Council authorizes the acquisition of all rights-of-way needed by way of negotiations by agents or administrators of Beaufort County and/or by way of eminent domain of such rights-of-way to complete the projects” which includes the Sidewalks and Multi-use Pathways – Safe Routes to School and Lady’s Island Corridor Traffic Improvements, and “all acquisitions of such rights-of-way will conform to the standards approved by Beaufort County, South Carolina Department of Transportation, and the Federal Highway Administration”. EXHIBIT A Pages 1-4 document the Tracts requiring new right of way and/or temporary construction easement for the Sidewalks and Multi-use Pathways – Safe Routes to Schools and EXHIBIT A Pages 5-8 for the Lady’s Island Corridor Traffic Improvements. Beaufort County and its agent are acquiring the rights-of-way and/or temporary construction easements for the project by appraisal recommending the ‘just compensation’ value as approved by Beaufort County and SCDOT in accordance with the Intergovernmental Agreement. The Beaufort County approval/negotiating process is following Resolution 2021/20 for the ‘just compensation’ value to the property owner and/or eminent domain proceedings. FISCAL IMPACT: Funded by the 2018 One Percent Transportation Sales and Use Tax Account # 4705-80-0000-54500-PTHWY Current balance is $13,148,493.49 APPROVAL HISTORY: The vote at the Public Facilities Committee Meeting on August 17, 2026 - 9:0 Page 56 of 246 The vote at First Reading on September 14, 2026 - 10:0. Page 57 of 246 Page I of2 ORDINANCE NO. 2026/ AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR OR NEGOTIATING AUTHORITY TO EXECUTE ANY AND ALL NECESSARY DOCUMENTS FOR THE ACCEPTANCE OF RIGHT OF WAY AND/OR TEMPORARY CONSTRUCTION EASEMENT PROPERTIES AS SHOWN ON EXHIBIT A PAGES 1–4 ASSOCIATED WITH THE SIDEWALKS AND MULTI-USE PATHWAYS – SAFE ROUTES TO SCHOOLS AND EXHIBIT A PAGES 5–8 ASSOCIATED WITH THE LADY'S ISLAND CORRIDOR TRAFFIC IMPROVEMENTS WHEREAS, Beaufort County Council approved Resolution 2019/44 for the 2018 One Percent (1%) Transportation Sales and Use Tax that authorizes the acquisition of all right-of-ways needed by way of negotiations conducted by agents or administrators of Beaufort County and/ or by way of eminent domain of such right-of-ways needed to complete the projects which includes: 1. Sidewalks and Multi-use Pathways – Safe Routes to School a. Broad River Boulevard and Riley Road b. Broad River Drive c. Salem Road 2. Lady’s Island Corridor Traffic Improvements a. Airport Frontage Road Phase 2 b. Hazel Farm Road/Gay Drive c. US 21 Widening near Walmart WHEREAS, Beaufort County Council approved Resolution 2021/20, a Resolution establishing right of way ac quisition policies associated with the implementation of 2018 One Cent Sales Tax Referendum Projects approved by voters November 6, 2018; and WHEREAS, Beaufort County and its agents are acquiring the right of ways and/or temporary construction easem ents to the standards approved by Beaufort County, South Carolina Department of Transportation, and the Federal Highway Administration.; and WHEREAS, Beaufort County and its agents are acquiring the right of ways and/or temporary construction easem ents for the properties as shown on Exhibit A Pages 1-4 for the Sidewalks and Multi-use Pathways – Safe Routes to School projects and Exhibit A Pages 5-8 for the Lady’s Island Corridor Traffic Improvements projects by appraisal recommending the ‘just compensation’ value as approved by Beaufort County and SCDOT in accordance with the Intergovernmental Agreement; and Page 58 of 246 Page I of2 WHEREAS, Beaufort County approval/negotiating process is following Resolution 2021/20 for the ‘just compensa tion’ value to the property owner and/or eminent domain proceedings; and WHEREAS, the right of way and/or te mporary construction easement properties for the Sidewalks and Multi-use Pathways – Safe Routes to School projects and Lady’s Island Corridor Traffic Improvements projects are funded by the 2018 One Percent Transportation Sales and Use Tax; and WHEREAS, Beaufort County Council believe s that it is in the best interest of its citizens to formalize the County’s Right of Way interest in the properties on Exhibit A Pages 1-4 for th e Sidewalks and Multi-use Pathways – Safe Routes to School projects and E xhibit A Pages 5-8 for the Lady’s Island Corridor Traffic Improvements projects in Beaufort County. NOW, THEREFORE, BE IT ORDAINED that Beaufort County Council hereby authorizes the County Ad ministrator to execute any and all necessary documents for the acceptance of Right of Way properties on Exhibit A Pages 1-4 for the Sidewalks and Multi-use Pathways – Safe Routes to School projects and Exhibit A Pages 5-8 fo r the Lady’s Island Corridor Traffic Improvements projects in Beaufort County. ADOPTED this _____ day of _______, 2026. COUNTY COUNCIL OF BEAUFORT COUNTY By: ______________________________________ Alice Howard, Chairwoman ATTEST: ___________________________ Sarah W. Brock, Clerk to Council Third and Final Reading: Public Hearing: Second Reading: First Reading: Page 59 of 246 &9)*#*5" 1"(& Page 60 of 246                   "3 $"()&-)$"3 ()3  3 &$3 &/&3 & /3 ( 3 "$)3 *$3 (!3                                                       120 "()&-)$"3 ()3  3 &$3 &/&3 &/3 ( 3   .%'+3 %.#,3                                 &9)*#*5" 1"(& Page 61 of 246 &9)*#*5" 1"(& Page 62 of 246 &9)*#*5" 1"(& Page 63 of 246 &9)*#*5" 1"(& Page 64 of 246 &9)*#*5" 1"(& Page 65 of 246 &9)*#*5" 1"(& Page 66 of 246 &9)*#*5" 1"(& Page 67 of 246 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: 2026/47: AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE AN ELECTRIC LINE EASEMENT WITH DOMINION ENERGY ON THE PROPERTY KNOWN AS POCOTALIGO PRESERVE (TMS R710 012 000 0001 0000 AND R710 012 000 0072 0000). MEETING NAME AND DATE: County Council September 28, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval. If the Natural Resources Committee recommends approval, then move forward with three ordinance readings and a public hearing at County Council. PRESENTER INFORMATION: Dylan Kidd, Interim Assistant County Administrator, 5 minutes ITEM BACKGROUND: Beaufort County owns in fee-simple the property known as Pocotaligo Preserve located at 30 Cotton Hall Road in Yemassee, SC. Dominion Energy owns an overhead electric line that runs through various open fields on the property, which is negatively impacted by County-initiated land management activities. Due to the length of time the original easement agreement was executed by prior property owners, and the desire by both the County and Dominion to relocate the electric line to a more suitable location along the property access road, the execution of a new easement agreement is recommended. FISCAL IMPACT: There is no fiscal impact. Dominion will fully fund the relocation of the electrical line. APPROVAL HISTORY: The vote at Natural Resources Committee on September 8, 2026 - 7:0 Page 68 of 246 ORDINANCE 2026/____ AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE AN ELECTRIC LINE EASEMENT WITH DOMINION ENERGY ON THE PROPERTY KNOWN AS POCOTALIGO PRESERVE (TMS R710 012 000 0001 0000 and R710 012 000 0072 0000) WHEREAS, Beaufort County (“County”) owns in fee-simple the property known as Pocotaligo Preserve (“Property”) with TMS numbers R710 012 000 0001 0000 and R710 012 000 0072 0000; and WHEREAS, Dominion Energy (“Dominion”) owns an overhead electric line currently traversing through multiple open fields on the Property; and WHEREAS, the County and Dominion desire to formalize the use of the Property with an electric line easement and relocate the electric line from its current location to a more suitable location along the Property access road. NOW, THEREFORE be it ordained that Beaufort County Council duly assembled, does hereby authorize the County Administrator to execute an electric line easement with Dominion Energy on the property known as Pocotaligo Preserve (TMS R710 012 000 0001 0000 and R710 012 000 0072 0000). ORDAINED this ____ day of ____________, 2026 COUNTY COUNCIL OF BEAUFORT COUNTY BY: ___________________________________ Alice Howard, Chairman ATTEST: ___________________________ Sarah W. Brock, JD, Clerk to Council Page 69 of 246 RW-4-E-SC (Rev. 4-2019) Easement # 908057 INDENTURE, made this _________ day of ____________________, 2026 by and between Beaufort County of the State of South Carolina, hereinafter called “Grantor” (whether singular or plural), and the DOMINION ENERGY SOUTH CAROLINA, INC., a South Carolina corporation, having its principal office in Cayce, South Carolina, hereinafter called “Grantee”. WITNESSETH: That, in consideration of the sum of One Dollar ($1.00) received from Grantee, Grantor, being the owner of land situate in th e County of Beaufort, State of South Carolina, hereby grants and conveys to Grantee, its successors and assigns, the right to construct, extend, replace, relocate, perpetually maintain and operate an overhead or underground electric line or lines consisting of a ny or all of the following: poles, conductors, lightning protective wires, municipal, public or private communication lines, cables, condu its, pad mounted transformers, guys, push braces and other accessory apparatus and equipment deemed by Grantee to be necessary or desirable, upon, over, across, through and under land described as follows: a tract or lot of land containing 527.1700 acres, more or less, and being the same lands conveyed to Grantor by deed of Open Space Institute Land Trust, Inc., dated or recorded 10/20/2023, and filed in the Register of Deeds office for Beaufort County in Deed book 4284 at Page 1424. All those certain pieces, parcels, or tracts of land, situate, lying and being in Beaufort County, South Carolina, containing 232.18 Acres known and designated as "Duveaux Hill Parcel A" and 294.99 Acres known and designated as "Parcel C" and being more fully described and shown as plat entitled "This Plat is Prepared at the Request of the Tomotley Crew, LLC A Division of Tax Map #R710 012 000 001 0000, Sheldon Area, Beaufo rt County, South Carolina" on that certain plat recorded in Plat Book 161 at Page 136. The easement is for the electric facilities more fully shown on Dominion Energy drawing # 86320 and any revisions made thereof and is made a part hereof by reference only. This easement supersedes and replaces the previous easement granted by The Tomotley Crew, LLC recorded October 4, 2022, and recorded in the Beaufort County Register of Deeds in Deed Book 4187 page 263. A signed Dominion Energy drawing by the Grantor will be authorization for the Grantee to install future facilities within the limits of the property shown on the above-mentioned plat. TMS: R710 012 000 0001 0000 and R710 012 000 0072 0000 Together with the right from time to time to install on said line such additional lines, apparatus and equipment as Grantee m ay deem necessary or desirable and the right to remove said line or any part thereof. Together also with the right (but not the obligation) from time to time to trim, cut or remove trees, underbrush and other ob structions that are within, over, under or through a strip of land (“Easement Space”) extending Fifteen (15) feet on each side of any pole lines and Five (5) feet on each side of any underground wires and within, over, under or through a section of land extending Twelve (12) feet from the door side(s) of any pad mounted transformers, elbow cabinets, switchgears or other devices as th ey are installed; provided, however, any damage to the property of Grantor (other than that caused by trimming, cutting or removing) caused by Grantee in maintaining or repairing said lines, shall be borne by Grantee; provided further, however, that Granto rs agree for themselves, their successors and assigns, not to build or allow any structure to be placed on the premises in such a manner t hat any part thereof will exist within the applicable above specified Easement Space, and in case such structure is bu ilt, then Grantor, or such successors and assigns as may be in possession and control of the premises at the time, will promptly remove the same upon de mand of Grantee herein. Grantor further agrees to maintain minimum ground coverage of thirty six (36) inches and maximum ground coverage of fifty four (54) inches over all underground primary electric lines. Together also with the right of entry upon said lands of Grantor for all of the purposes aforesaid. The words “Grantor” and “Grantee” shall include their heirs, executors, administrators, successors and assigns, as the case m ay be. IN WITNESS WHEREOF, Grantor has caused this indenture to be duly executed the day and year first above written. WITNESS: [SIGNATURES TO FOLLOW Page 70 of 246 RW-4-E-SC (Rev. 4-2019) Easement # 908057 Beaufort County ______________________________________________________________ By: ________________________________________________________ 1st Witness ______________________________________________________________ ____________________________________________________________ 2nd Witness Print Name ___________________________________________________________ Title ACKNOWLEDGMENT STATE OF SOUTH CAROLINA ) ) COUNTY OF Beaufort ) The foregoing instrument was acknowledged before me, the undersigned Notary, and I do hereby certify that the within named o f Beaufort County personally appeared before me this day and that the above named acknowledged the due execution of the foregoing instrument. Sworn to before me this ______ day of ____________, 2026 _________________________________ Signature of Notary Public State of SC My commission expires: ___________ ________________________________ Print Name of Notary Public RIGHT OF WAY GRANT TO DOMINION ENERGY SOUTH CAROLINA, INC. Line: COTTON HALL TIE LINE County: Beaufort R/W File Number: 29059 Grantor(s): Beaufort County Return to: DESC C/O Right of Way Dept., 81 May River Road, Bluffton, SC 29910 Page 71 of 246 RW-4-E-SC (Rev. 4-2019) Page 72 of 246 TRASK PKWY.(US HWY 21) COTTON HALL RD. STONEY CREEK CEMETARY RD. TRASK PKWY.(US HWY 21) NO DATEBYREVISIONFORDRNSHEET OF SHEETS TITLEDETAILSCALE:SUB.APPDIST#CKT# DOMINION ENERGY SOUTH CAROLINA, INC. SCALE: DEVELOPER'S SIGNATURE BLOCK 3 DAYS BEFORE DIGGINGIN SOUTH CAROLINACALL 811IT'S THE LAWPALMETTO UTILITY PROTECTION SERVICE EASEMENT NO.FILE NUMBERR/W AGENTRIGHT OF WAY INFORMATION W.R.#STARTED COMPLETEDCLOSED OUTW.O.# GAS ENG.-TECH.ELECTRIC ENG.-TECH.COORDINATORBY:BY:BY: DOMINION ENERGY SOUTH CAROLINA, INC.ELECTRIC DISTRIBUTION SYMBOLS PRELIMINARY Page 73 of 246 BEAUFORT COUNTY COUNTY COUNCIL AGENDA ITEM SUMMARY ITEM TITLE: 2026/48: AN ORDINANCE AMENDING THE BEAUFORT COUNTY CODE OF ORDINANCES, CHAPTER74 - BUILDING AND BUILDING REGULATIONS, SECTION 74-64, ADOPTION OF BUILDING CODES (AMENDS CODE OF ORDINANCES TO ADOPT THE 2024 STATE MANDATED CODE EDITIONS). MEETING NAME AND DATE: County Council September 28, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval. Motion to approve/deny — AN ORDINANCE AMENDING THE BEAUFORT COUNTY CODE OF ORDINANCES, CHAPTER 74 - BUILDING AND BUILDING REGULATIONS, SECTION 74-64, ADOPTION OF BUILDING CODES (AMENDS CODE OF ORDINANCES TO ADOPT THE 2024 STATE MANDATED CODE EDITIONS) Move forward to Council for First Reading PRESENTER INFORMATION: Michael Brantley, Director Building Services, 5 minutes ITEM BACKGROUND: On August 26, 2025, the South Carolina Building Codes Council (the "Council") adopted the latest editions of the mandatory code and appendices with modifications, as referenced in S.C. Code Ann. §6-9-50 (1976, as amended), to be enforced by all municipalities and counties in South Carolina. The Council established the implementation date for local jurisdictions as January 1, 2027. Local adoption of the latest state mandated code editions is required by state law. FISCAL IMPACT: No Fiscal Impact APPROVAL HISTORY: The vote at Natural Resources Committee on September 8, 2026 - 7:0 Page 74 of 246 '-" South Carolina N Building Codes 0 Modifications N Index Page 75 of 246 Introduction to 2024 Building Codes Modifications Index On August 26, 2025, the South Carolina Building Codes Council (the “Council”) adopted the latest editions of the mandatory codes and select appendices with modifications, as referenced in S.C. Code Ann. §6 -9-50 (1976, as amended), to be enforced by all municipalities and counties in South Carolina. More specifically, t he Council modified and adopted the building codes listed below for use in the State of South Carolina: 2024 Edition of the International Building Code1 2024 Edition of the International Residential Code2 2024 Edition of the International Fire Code3 2024 Edition of the International Plumbing Code4 2024 Edition of the International Mechanical Code5 2024 Edition of the International Fuel Gas Code6 2023 Edition of the National Electrical Code The Council established the implementation date for local jurisdictions as January 1, 2027. The Modifications Index lists all modifications that apply to the mandatory building codes listed above, as well as any appendices adopted by the Council . The modifications are arranged by the affected code section numbers in ascending order. Modifications continued from a prior building code cycle were renumbered to coincide with the 2024 building code cycle numbering, and are distinguished by a note and reference to their prior modification numbers. Strikethrough indicates the language deleted by a modification and an underline indicates language added. The latest edition of the permissive codes referenced in S.C. Code Ann. § 6-9-60 (1976, as amended) may be adopted by municipalities and counties via ordinance, and this local adoption by ordinance must take place before enforcement can begin. The permissive codes are the latest editions of the International Property Maintenance Code, International Existing Building Code, International Performance Code, and International Swimming Pool and Spa Code. Adoption of the mandatory codes and permissive codes does not include the chapters, sections or provisions addressing administrative policies or procedures. Administrative policies and procedures are the sole responsibility of each local jurisdiction. If the governing body of a local jurisdiction desires to use the administrative provisions in one or more of the adopted codes, it must first adopt the chapters or sections by ordinance. In lieu of adopting the administrative provisions contained in the adopted codes, the governing body of a local jurisdiction may develop specific administrative policies and procedures for the operation o f its Building Inspection Department by ordinance. The latest edition of ICC/ANSI A117.1, Accessible and Usable Buildings and Facilities, is adopted by statute (S.C. Code Ann. § 10-5-210 et seq.), and is mandatory for use in all municipalities and counties within the State. 1 As modified, known as the 2024 South Carolina Building Code 2 As modified, known as the 2024 South Carolina Residential Code 3 As modified, known as the 2024 South Carolina Fire Code 4 As modified, known as the 2024 South Carolina Plumbing Code 5 As modified, known as the 2024 South Carolina Mechanical Code 6 As modified, known as the 2024 South Carolina Fuel Gas Code 1 2024 Building Code Modification Index (11/3/2025 V.1) Page 76 of 246 The South Carolina Legislature has enacted the Energy Standard Act (S.C. Code Ann. § 6-10-10 et seq.), and pursuant to the Energy Standard Act, the 2009 edition of the Inte rnational Energy Conservation Code has been statutorily adopted as the energy standard and is mandatory for use in all jurisdictions within the State. Additional information about the building codes adoption process can be found on the South Carolina Building Codes Council’s website. 2 2024 Building Code Modification Index (11/3/2025 V.1) Page 77 of 246 2024 SOUTH CAROLINA BUILDING CODES MODIFICATIONS INDEX Index # Code Modifications New/Continuation 2024 INTERNATIONAL BUILDING CODE (IBC) IBC 2024 01 [A] 101.4.7 Existing buildings Continuation IBC 2024 02 202 Definitions – Vapor retarder, ground contact & Primitive camp structure Continuation IBC 2024 03 303.4 Assembly Group A-3 (IFC 2024 03) Continuation IBC 2024 04 312.1 General Continuation IBC 2024 05 706.1 General Continuation IBC 2024 06 1010.2.13 Controlled egress doors in Group I-1, I-2 and I-4 (Adult Day Care Occupancy only) (IFC 2024 16) Continuation IBC 2024 07 1016.2 Egress through intervening spaces (IFC 2024 17) Continuation IBC 2024 08 1803.2 Investigation required Continuation IBC 2024 09 1907.4 Vapor retarder Continuation IBC 2024 10 2303.2.3 Other means during manufacture Continuation IBC 2024 11 [P] 2902.1.1 Fixture calculations (IPC 2024 11) Continuation IBC 2024 12 [P] 2902.2 Separate facilities (IPC 2024 12) Continuation IBC 2024 13 Appendix H Signs Continuation 2024 INTERNATIONAL RESIDENTIAL CODE (IRC) IRC 2024 01 R202 Definitions – Accepted Engineering Practice Continuation IRC 2024 02 R202 Definitions – Crawl Space Continuation IRC 2024 03 R202 Definitions – Sleeping Loft New from HBA of SC IRC 2024 04 R301.2.1 Wind design criteria Continuation IRC 2024 05 R301.2.2 Seismic provisions New from HBA of SC IRC 2024 06 R301.2.2.1 Determination of seismic design category Continuation IRC 2024 07 R302.1 Exterior Walls (adds exception #6) Continuation IRC 2024 08 R302.1 Exterior Walls (adds exception #7) Continuation IRC 2024 09 R302.2.7 Meter Location New from HBA of SC IRC 2024 10 R302.4.1 Through penetrations Continuation IRC 2024 11 R302.5.1 Opening protection Continuation IRC 2024 12 R302.13 Fire protection of floors Continuation IRC 2024 13 R304.1.1 Field treatment Continuation IRC 2024 14 305.1 Subterranean termite control methods Continuation IRC 2024 15 R305.4 Foam Plastic Protection Continuation IRC 2024 16 R305.5 Termite inspection strip Continuation IRC 2024 17 R309 Automatic Sprinkler Systems Continuation IRC 2024 03 R310.3 Location New from HBA of SC IRC 2024 03 R314.1 General New from HBA of SC 3 2024 Building Code Modification Index (11/3/2025 V.1) Page 78 of 246 Index # Code Modifications New/Continuation IRC 2024 03 Section R315 Sleeping Lofts New from HBA of SC IRC 2024 18 R316.3 Story above grade plane Continuation IRC 2024 19 R318.3.1 Floor elevations at the required egress doors New from HBA of SC IRC 2024 20 R318.7.5.1 Risers Continuation IRC 2024 03 R319.1 Emergency escape and rescue opening required New from HBA of SC IRC 2024 21 R321.1.1 Where required Continuation IRC 2024 22 R321.2 Window fall protection Continuation IRC 2024 23 R325.3 Mechanical ventilation Continuation IRC 2024 24 Figure R327.1 Minimum Fixture Clearances Continuation IRC 2024 25 R404.1.9.2 Masonry piers supporting floor girders Continuation IRC 2024 26 R408.3 Unvented crawl space Continuation IRC 2024 27 R408.3 Unvented crawl space Continuation IRC 2024 28 R408.4 Access Continuation IRC 2024 29 R408.8 Under-floor vapor retarder Continuation IRC 2024 30 R502.12.4 Truss design drawings Continuation IRC 2024 31 R506.3.3 Vapor retarder Continuation IRC 2024 32 R606.7 Piers Continuation IRC 2024 33 R802.10.1 Truss design drawings Continuation IRC 2024 34 Table R905.1.1(2) Underlayment application New from HBA of SC IRC 2024 35 R905.2.8.5 Drip Edge Continuation IRC 2024 36 Chapter 11 Energy Efficiency Continuation IRC 2024 37 M1411.9.1 Auxiliary and secondary drain systems New from HBA of SC IRC 2024 38 M1411.12 Insulation of refrigerant piping Continuation IRC 2024 39 M1411.15 Locking access port caps Continuation IRC 2024 40 M1502.3 Duct termination Continuation IRC 2024 41 M1502.4.2 Duct Installation Continuation IRC 2024 42 M1502.4.6 Duct length Continuation IRC 2024 43 M1503.6 Makeup air Continuation IRC 2024 44 M1504.3 Exhaust Openings Continuation IRC 2024 45 M1601.4.1 Joints, Seams and Connections Continuation IRC 2024 46 G2415.17.1 (404.17.1) Limitations (IFGC 2024 03) New from Omega Flex, Inc. IRC 2024 47 G2418.2 Design and installation Continuation IRC 2024 48 P2503.6 Shower liner test Continuation IRC 2024 49 P2503.6 Shower liner test New from HBA of SC IRC 2024 50 P2603.2.1 Protection against physical damage Continuation IRC 2024 51 P2603.5 Freezing Continuation IRC 2024 52 P2603.5 Freezing Continuation IRC 2024 53 P2705.1 General Continuation IRC 2024 54 P2705.1 General New from HBA of SC IRC 2024 55 P2708.4 Shower control valves Continuation IRC 2024 56 P2713.3 Bathtub and whirlpool bathtub valves Continuation 4 2024 Building Code Modification Index (11/3/2025 V.1) Page 79 of 246 Index # Code Modifications New/Continuation IRC 2024 57 P2903.10.3 Fixture valves and access New from HBA of SC IRC 2024 58 P2903.11 Hose bibb Continuation IRC 2024 59 P2904.2.4.2.1 Additional requirements for pendent sprinklers Continuation IRC 2024 60 E3601.7.3 Metering centers New from HBA IRC 2024 61 E3606.5 Surge protection Continuation IRC 2024 62 E3702.2 Branch-circuit ampere rating New from HBA IRC 2024 62 E3702.3 Ten-ampere branch circuits New from HBA IRC 2024 63 E3802.4 In unfinished basements Continuation IRC 2024 64 E3901.4.2 Island and peninsular countertops and work surfaces New from HBA of SC IRC 2024 64 E3901.4.3 Receptacle outlet location New from HBA of SC IRC 2024 65 E3902 Ground-Fault and Arc-Fault Circuit-Interrupter Protection Continuation IRC 2024 66 E3902.5 Basement receptacles Continuation IRC 2024 67 E3902.12 Specific appliance outlets New from HBA of SC IRC 2024 68 E3902.14 Outdoor outlets (NEC 2023 02) Continuation IRC 2024 69 E3902.21 Arc-fault circuit-interrupter protection Continuation IRC 2024 70 E4002.11 Bathtub and shower space New from HBA of SC IRC 2024 71 E4002.14 Tamper-resistant receptacles Continuation IRC 2024 72 Chapter 44 Referenced Standards Continuation IRC 2024 73 Chapter 44 Referenced Standards (IMC 2024 02) New from Daikin Comfort IRC 2024 74 Appendix BF Patio Covers Continuation IRC 2024 75 Appendix BO Existing Buildings and Structures Continuation IRC 2024 76 Appendix BB Tiny Houses Continuation 2024 INTERNATIONAL FIRE CODE (IFC) IFC 2024 01 202 General definitions – Primitive camp structure Continuation IFC 2024 02 202 General definitions – Recreational fire Continuation IFC 2024 03 [BG] 203.2.8 Assembly Group A-3 (IBC 2024 03) Continuation IFC 2024 04 315.3.3 Equipment rooms Continuation IFC 2024 05 503.1.2 Additional access Continuation IFC 2024 06 503.2.1 Dimensions Continuation IFC 2024 07 507.1 Required water supply Continuation IFC 2024 08 507.5.1 Where required Continuation IFC 2024 09 507.5.1.1 Hydrant for standpipe systems Continuation IFC 2024 10 507.5.4 Obstruction Continuation IFC 2024 11 606.3.3.2 Grease accumulation New from Midlands Fire Marshal Association IFC 2024 12 607.1 General Continuation IFC 2024 13 901.6.3 Records Continuation 5 2024 Building Code Modification Index (11/3/2025 V.1) Page 80 of 246 Index # Code Modifications New/Continuation IFC 2024 16 1010.2.13 Controlled egress doors in Group I-1, I-2 and I-4 (Adult Day Care Occupancy only) (IBC 2024 06) Continuation IFC 2024 17 1016.2 Egress through intervening spaces (IBC 2024 07) Continuation IFC 2024 18 1032.11 Maintenance of the listed occupancy load signage New from Midlands Fire Marshal Association IFC 2024 19 2303.2 Emergency disconnect switches New from Midlands Fire Marshal Association IFC 2024 20 2303.2.2 Testing Continuation IFC 2024 21 2304.3.6 Communications New from Midlands Fire Marshal Association IFC 2024 22 2305.5 Fire extinguishers Continuation IFC 2024 23 2307.4 Location of dispensing operations and equipment Continuation IFC 2024 24 2307.7 Public fueling of motor vehicles Continuation IFC 2024 25 4106.6 Clearance Requirements Continuation IFC 2024 26 6101.1 Scope Continuation IFC 2024 27 6104.2 Maximum capacity within established limits New from Southeast Propane Alliance (SEPA) IFC 2024 28 6106.1 Attendants Continuation IFC 2024 29 6107.3 Clearance to combustibles New from Southeast Propane Alliance (SEPA) IFC 2024 30 6107.4 Protecting containers from vehicles Continuation IFC 2024 31 6109.13 Protection of containers Continuation IFC 2024 32 6110.1 Removed from service New from Southeast Propane Alliance (SEPA) IFC 2024 33 6111.2.1 Near residential, educational and institutional occupancies and other high-risk areas Continuation IFC 2024 34 6111.2.1 Near residential, educational and institutional occupancies and other high-risk areas New from Southeast Propane Alliance (SEPA) 2024 INTERNATIONAL PLUMBING CODE (IPC) IPC 2024 01 202 General Definitions – Drinking Fountain Continuation IPC 2024 02 202 General Definitions – Bottle-Filling Station Continuation IPC 2024 03 202 General Definitions – Water Cooler Continuation IPC 2024 04 202 General Definitions – Water Dispenser Continuation IPC 2024 05 403.1.1 Fixture calculations (IBC 2024 11) Continuation IPC 2024 06 403.2 Separate facilities (IBC 2024 12) Continuation 2024 INTERNATIONAL MECHANICAL CODE (IMC) IMC 2024 01 504.9.2 Duct Installation Continuation IMC 2024 02 Table 1103.1 Refrigerant Classification, Amount and OEL (IRC 2024 73) New from Daikin Comfort 6 Page 81 of 246 Index # Code Modifications New/Continuation IMC 2024 03 1109.2.5 Refrigerant pipe shafts New from Johnson and Associates IMC 2024 04 1109.3.2 Shaft ventilation New from Daikin Comfort IMC 2024 02 Chapter 15 Referenced Standards New from Daikin Comfort 2024 INTERNATIONAL FUEL GAS CODE (IFGC) IFGC 2024 01 401.9 Identification Continuation IFGC 2024 02 401.10 Third-party testing and Certification Continuation IFGC 2024 03 404.17.1 Limitations (IRC 2024 46) New from Omega Flex, Inc. IFGC 2024 04 412.4 Listed equipment Continuation IFGC 2024 05 412.6 Location Continuation IFGC 2024 06 412.8.3 Vehicle impact protection Continuation IFGC 2024 07 412.10 Private fueling of motor vehicles Continuation IFGC 2024 08 505.1.1 Commercial cooking appliances vented by exhaust hoods Continuation 2023 NATIONAL ELECTRICAL CODE (NEC) NEC 2023 01 210.8(A) Dwelling Units Continuation NEC 2023 02 210.8(F) Outdoor Outlets (IRC 2024 68) Continuation NEC 2023 03 210.12(B) Dwelling Units Continuation 7 Page 82 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 01 Code Section: [A] 101.4.7 Existing Buildings Proponent: American Concrete Institute (ACI) Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 01 [A] 101.4.7 Reason: To establish minimum requirements for the evaluation, design, construction, repair and rehabilitation of concrete structural elements in existing buildings. Modification: [A] 101.4.7 Existing buildings. The provisions of the International Existing Building Code shall apply to matters governing the repair, alternation, change of occupancy, addition to and relocation of existing buildings. 101.4.7.1 Structural concrete. In addition, assessment, repairs, and restoration of structural concrete in accordance with ACI 562 shall be permitted. Exception: ACI 562 shall not be used for the evaluation or design of repairs or rehabilitation of elements of seismic force-resisting system that result in strength, stiffness, or ductility of those elements different from the pre-damage condition. (Add new referenced standard to Chapter 35 as follows) ACI American Concrete Institute 38800 Country Club Drive Farmington Hills, MI 48331 Standard reference number Title Referenced in code section number 562-19 Code Requirements for Assessment, Repair, and Rehabilitation of Existing Concrete Structures 101.4.7.1 8 2024 Building Code Modification Index (11/3/2025 V.1) Page 83 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 02 Code Section: 202 Definitions Vapor Retarder, Ground Contact (new definition) Primitive Camp Structure (new definition) Proponent: Building Officials Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 02 202 IBC 2018 IBC 2018 01 202 Reason: To provide clear definitions and uniform interpretation of the phrases. Modification: 202 Definitions: Vapor Retarder, Ground Contact: Ground contact vapor retarder class shall be defined using the requirements of ASTM E1745, Class A, B, or C -Standard specification for water vapor retarders used in contact with soil or granular fill under concrete slabs. Primitive Camp Structure: Shall include any structure permanent or temporary in nature, used for outdoor camping (transient), open on at least one side with no fully enclosed habitable spaces, less than 400 square feet under roof, and not classified as a res idential occupancy due to lack of electrical, plumbing, mechanical and sprinkler systems. 9 2024 Building Code Modification Index (11/3/2025 V.1) Page 84 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 03 Code Section: 303.4 Assembly Group A-3 Proponent: Building Officials Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 04 303.4 IBC 2018 IBC 2018 02 303.4 Reason: Add to the listing of A-3 occupancies the following use: Structures, without a commercial kitchen, used in agritourism activity as defined by S.C. Code Ann. 46-53-10(1). Modification: 303.4 Assembly Group A-3. Group A-3 occupancy includes assembly uses intended for worship, recreation or amusement and other assembly uses not classified elsewhere in Group A including, but not limited to: Amusement arcades Art galleries Bowling alleys Community halls Courtrooms Dance halls (not including food or drink consumption) Exhibition halls Funeral parlors Greenhouses for the conservation and exhibition of plants that provide public access Gymnasiums (without spectator seating) Indoor swimming pools (without spectator seating) Indoor tennis courts (without spectator seating) Lecture halls Libraries Museums Places of religious worship Pool and billiard parlors Structures, without a commercial kitchen, used in agritourism activity as defined by S.C. Code Ann. 46-53-10(1) Waiting areas in transportation terminals 10 2024 Building Code Modification Index (11/3/2025 V.1) Page 85 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 04 Code Section: 312.1 General Proponent: Building Officials Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 05 312.1 IBC 2018 IBC 2018 03 312.1 Reason: “Structures primarily used or associated with outdoor camping activities” include, but are not limited to, shelters, tree stands, sheds, rustic cabins, campfire shelters, shelters, tents, tepees, or other indigenous huts used only for campers or program participants, or used in conjunction with outdoor camping activities such as hiking, fishing, hunting, or nature appreciation, regardless of material used for construction. These structures are not to inclu de utilities such as mechanical, electrical or plumbing. Requiring that at least one side of the building be open will provide ventilation for any outside hearing source or propane lighting that may be used within the structure, and provide a clear path of egress travel to the outside. Limiting the size to 400 square feet will require larger buildings to be classified as a residential structure. Not allowing electrical, plumbing or mechanical systems will maintain the integrity of a primitive structure. Modification: 312.1 General. Buildings and structures of an accessory character and miscellaneous structures not classified in any specific occupancy shall be constructed, equipped and maintained to conform to the requirements of this code commensurate with the fire and life hazard incidental to their occupancy. Group U shall include, but not be limited to, the following: Agricultural buildings Aircraft hangars, accessory to a one- or two-family residence (see Section 412.4) Barns Carports Communication equipment structures with a gross floor area of less than 1,500 square feet (139 m2) Fences more than 7 feet (2134 mm) in height Grain silos, accessory to a residential occupancy Livestock shelters Primitive Camp Structures Private garages Retaining walls Sheds Stables Tanks Towers 11 2024 Building Code Modification Index (11/3/2025 V.1) Page 86 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 05 Code Section: 706.1 General Proponent: Building Officials Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 07 706.1 IBC 2018 IBC 2018 05 706.1 Reason: Unusually restrictive —in an attempt to clarify this section for the purpose of uniform enforcement, the ICC created a huge error which takes away the designers’ options to leave an existing, nonconforming building alone when separated by a fire wall. The intent was to show that the fire protection systems, utilities, access, and egress could be one system when a fire wall is utilized, and do not have to be separate systems due to the fire wall creating different buildings. This requirement would unjustly and significantly drive up the cost of construction as it relates to additions to existing buildings. Modification: 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. Each portion of a building separated by one or more firewalls may be considered a separate building. The extent and location of such fire walls shall provide a complete separation. Where a fire wall separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. 12 2024 Building Code Modification Index (11/3/2025 V.1) Page 87 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 06 Code Section: 1010.2.13 Controlled egress doors in Group I-1, I-2 and I-4 (Adult Day Care Occupancy only) Proponent: Midlands Fire Marshal Association Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 10 1010.2.14 Reason: To prevent nuisance alarms and reduce elopement issues when serving clients with Dementia or Alzheimer’s, or similar health care issues. Modification: 1010.2.13 Controlled egress doors in Groups I-1, I-2, and I-4 (Adult Day Care Occupancy only). Controlled egress electrical locking systems where egress is controlled by authorized personnel shall be permitted on doors in the means of egress in Group I -1, I-2, and I-4 (Adult Day Care occupancy only) occupancies where the clinical needs of persons receiving care require their containment. Controlled egress doors shall be permitted in such occupancies where the building is equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1 or an approved automatic smoke detectio n system installed in accordance with Section 907, provided that the doors are installed and operate in accordance with all of the following: 1. The door's electric locks shall unlock on actuation of the automatic sprinkler system or automatic smoke detection system allowing immediate free egress. 2. The door's electric locks shall unlock on loss of power to the electrical locking system or to the electric lock mechanism allowing immediate free egress. 3. The electric locking system shall be installed to have the capability of unlocking the electric locks by a switch located at the fire command center, a nursing station or other approved location. The switch shall directly break power to the electric lock. 4. A building occupant shall not be required to pass through more than one door equipped with a controlled egress locking system before entering an exit. 5. The procedures for unlocking the doors shall be described and approved as part of the emergency planning and preparedness required by Chapter 4 of the International South Carolina Fire Code. 6. All clinical staff shall have the keys, codes or other means necessary to operate the controlled egress electrical locking systems. 7. Emergency lighting shall be provided at the door. 8. The electromechanical or electromagnetic locking device shall be listed in accordance with either UL 294 or UL 1034. Exceptions: 1. Items 1 through 4 shall not apply to doors to areas occupied by persons who, because of clinical needs, require restraint or containment as part of the function of a psychiatric or cognitive treatment area. 2. Items 1 through 4 shall not apply to doors to areas where a listed egress control system is utilized to reduce the risk of child abduction from nursery and obstetric areas of a Group I-2 hospital. 13 2024 Building Code Modification Index (11/3/2025 V.1) Page 88 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 07 Code Section: 1016.2 Egress through intervening spaces Proponent: Building Officials Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 11 1016.2 IBC 2018 IBC 2018 10 1016.2 Reason: This is a longstanding modification that was updated in 2018 based on changes in the 2018 IBC. The modification provides additional egress options by adding the exceptions below. Modification: 1016.2 Egress through intervening spaces. Egress through in tervening spaces shall comply with this section. 1. Exit access through an enclosed elevator lobby is permitted. Where access to two or more exits or exit access doorways is required in Section 1006.2.1, access to not less than one of the required exits shall be provided without travel through the enclosed elevator lobbies required by Section 3006 of the South Carolina Building Code . Where the path of exit access travel passes through an enclosed elevator lobby, the level of protection required for the enclosed elevator lobby is not required to be extended to the exit unless direct access to an exit is required by other sections of this code. 2. In other than Group H occupancies, egress from a room or space is allowed to pass through adjoining or intervening rooms or areas provided that such adjoining rooms or areas and the area served are accessory to one or the other and provide a discernible path of egress travel to an exit. 3. In Group H occupancies, egress from a room or space is allowed to pass through adjoining or intervening rooms or areas provided that such adjoining rooms or areas are the same or lesser hazard occupancy group and provide a discernible path of egress travel to an exit. 4. An exit access shall not pass through a room that can be locked to prevent egress. Exception: An electrically locked exit access door providing egress from an elevator lobby shall be permitted in accordance with Section 1010.2.14. 5. Means of egress from dwelling units or sleeping areas shall not lead through other sleeping areas, toilet rooms or bathrooms. Exception: Dwelling units or sleeping areas in R -1 and R-2 occupancies shall be permitted to egress through other sleeping areas serving adjoining rooms that are part of the same dwelling unit or guest room. (Page 2 of IBC 2024 07 - Section 1016.2) 14 2024 Building Code Modification Index (11/3/2025 V.1) Page 89 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index 6. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes. Exceptions: 1. Means of egress are not prohibited through a kitchen area serving adjoining rooms constituting part of the same dwelling unit or sleeping unit. 2. Means of egress are not prohibited through stockrooms in Group M occupancies where all of the following are met: 2.1. The stock is of the same hazard classification as that found in the main retail area. 2.2. Not more than 50 percent of the exit access is through the stockroom. 2.3. The stockroom is not subject to locking from the egress side. 2.4. There is a demarcated, minimum 44 -inch-wide (1118 mm) aisle defined by full- or partial-height fixed wall s a wall not less than 42 inches (1067 mm) high or similar construction that will maintain the required width and lead directly from the retail area to the exit without obstructions. 15 2024 Building Code Modification Index (11/3/2025 V.1) Page 90 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 08 Code Section: 1803.2 Investigations required Proponent: Building Officials Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 14 1803.2 IBC 2018 IBC 2018 11 1803.2 Reason: The IBC requires a geotechnical investigation for all projects regardless of size. The only exception which allows the building official to waive the requirements puts unnecessary liability on the building official to determine if adequate information can be gathered from adjacent sites. In areas that must account for seismic activity, the conditions may vary in as few as 100 yards. For large commercial projects, the soil conditions may have a drastic effect on the design of the structure; however, for smaller projects the soil condition has significantly less bearing on its design. It is often determined on small projects that the soil conditions do not have an effect on the design of the structure. See ASCE 7 -20-3-1, Exception. Each of the equations results in a period of vibration of less than 0.5 seconds and exceeds the size of a typical one-story structure. Modification: 1803.2 Investigations required. Geotechnical investigations shall be conducted in accordance with Sections 1803.3 through 1803.5. Exceptions: 1. The building official shall be permitted to waive the requirement for a geotechnical investigation where satisfactory data from adjacent areas is available that demonstrates an investigation is not necessary for any of the conditions in Sections 1803.5.1 through 1803.5.6 and Sections 1803.5.10 and 1803.5.11. 2. For single story buildings not more than 5,000 sq ft and not more than 30ft in height, a site specification investigation report is not required if the seismic design category is determined by the design professional in accordance with Chapter 20 of ASCE 7. 16 2024 Building Code Modification Index (11/3/2025 V.1) Page 91 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 09 Code Section: 1907.4 Vapor retarder Proponent: Structural Engineers Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 16 1907.1 IBC 2018 IBC 2018 12 1907.1 Reason: To bring the IBC into compliance with the American Concrete Institute’s standards. Modification: 1907.4 Vapor retarder. A 6-mil (0.006 inch; 0.15 mm) 10-mil (0.010 inch) polyethylene ground contact vapor retarder with joints lapped not less than 6 inches (152 mm) shall be placed between the base course or subgrade and the concrete floor slab, or other approved equivalent methods or materials shall be used to retard vapor transmission through the floor slab. Exception: A vapor retarder is not required: 1. For detached structures accessory to occupancies in Group R-3, such as garages, utility buildings or other unheated facilities. 2. For unheated storage rooms having an area of less than 70 square feet (6.5 m2) and carports attached to occupancies in Group R-3. 3. For buildings of other occupancies where migration of moisture through the slab from below will not be detrimental to the intended occupancy of the building. 4. For driveways, walks, patios and other flatwork that will not be enclosed at a later date. 5. Where approved based on local site conditions. 17 2024 Building Code Modification Index (11/3/2025 V.1) Page 92 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 10 Code Section: 2303.2.3 Other means during manufacture Proponent: Building Officials Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 17 2303.2.2 IBC 2018 IBC 2018 13 2303.2.2 Reason: The language in the 2018 code would prevent the use of methods for the treatment of fire - retardant treated wood that have been in use since at least 2009. We’re not aware of any issues with products that have been tested in accordance with code requirements. Modification: [BF] 2303.2.3 Other means during manufacture. For wood products impregnated with chemicals by other means during manufacture, the treatment shall be an integral part of the manufacturing process of the wood product. The treatment shall provide permanent protection to all surfaces of the wood product. The use of paints, coating, stains or other surface treatments is not an approved method of protection as required in this section. 18 2024 Building Code Modification Index (11/3/2025 V.1) Page 93 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 11 Code Section: [P] 2902.1.1 Fixture calculations Emergency Code Modification Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 19 [P] 2902.1.1 Reason: Gender-neutral gang-type bathrooms pose a serious threat to the health and safety of all by increasing the incident of sexual violence against women and children, as well as increasing the incident of wrongful accusations of assault, voyeurism, and the like. Gender -neutral gang-type bathrooms also undermine and reduce the “safe spaces” for victims of human trafficking, as well as discriminating against women and children by disproportionately decreasing the available number of bathroom spaces for women and children, while men will have access to both water closet compartments and urinal spaces. In addition, the common use sink space discriminates against women and children by disproportionately decreasing the area available for women to address personal needs, such as menstrual or other medical care, nursing and baby changing activities. Modification: [P] 2902.1.1 Fixture calculations. To determine the occupant load of each sex, the total occupant load shall be divided in half. To determine the required number of fixtures, the fixture ratio or ratios for each fixture type shall be applied to the occupant load of each sex in accordance with Table 2902.1. Fractional numbers resulting from applying the fixture ratios of Table 2902.1 shall be rounded up to the next whole number. For calculations involving multiple occupancies, such fractional numbers for each occupancy shall first be summed and then rounded up to the next whole number. Exceptions: 1. The total occupant load shall not be required to be divided in half where approved statistical data indicates a distribution of the sexes of other than 50 percent of each sex. 2. Where multiple-user facilities are designed to serve all genders, the minimum fixture count shall be calculated 100 percent, based on total occupant load. In such multiple-user user facilities, each fixture type shall be in accordance with ICC A117.1 19 2024 Building Code Modification Index (11/3/2025 V.1) Page 94 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 12 Code Section: [P] 2902.2 Separate facilities Emergency Code Modification Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 20 [P] 2902.2 Reason: Exception 6 is not necessary, as Exceptions 1 -5 provide sufficient guidance and latitude for business, schools, churches and other similar large-capacity spaces, to provide gender-neutral spaces with adequate privacy protections. Modification: [P] 2902.2 Separate facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. Exceptions: 1. Separate toilet facilities shall not be required for dwelling units and sleeping units. 2. Separate toilet facilities shall not be required in structures or tenant spaces with a total occupant load, including both employees and customers, of 15 or fewer. 3. Separate toilet facilities shall not be required in mercantile occupancies in which the maximum occupant load is 100 or fewer. 4. Separate toilet facilities shall not be required in business occupancies in which the maximum occupant load is 25 or fewer. 5. Separate toilet facilities shall not be required to be designated by sex where single -user toilet rooms are provided in accordance with Section 2902.1.2. 6. Separate toilet facilities shall not be required where rooms having both water closets and lavatory fixtures are designed for use by all persons regardless of sex and privacy is provided for water closets in accordance with Section 405.3.4 of the International Plumbing Code and for urinals in accordance with Section 405.3.5 of the International Plumbing Code. 20 2024 Building Code Modification Index (11/3/2025 V.1) Page 95 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Building Code Modification Index Number: IBC 2024 13 Code Section: Appendix H Signs Proponent: Structural Engineers Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IBC 2021 IBC 2021 18 Appendix H IBC 2018 IBC 2018 14 Appendix H IBC 2015 IBC 2015 07 Appendix H IBC 2012 IBC 2012 05 Appendix H Reason: To provide minimum requirements for signs for the protection of people and property. Modification: Appendix H Signs The provisions in Appendix H are adopted for use statewide. Appendix H gathers in one place the various standards that regulate the construction and protection of outdoor signs. Wherever possible, the appendix provides standards in performance language, thus allowing the widest possible application. 21 2024 Building Code Modification Index (11/3/2025 V.1) Page 96 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 01 Code Section: R202 Definitions: Accepted Engineering Practice Proponent: Coastal Code Enforcement Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 01 R202 IRC 2018 IRC 2018 01 R202 IRC 2015 IRC 2015 01 R202 IRC 2012 IRC 2012 01 R202 Reason: To provide a clear definition and uniform interpretation of the phrase. Modification: A definition of “Accepted Engineering Practice” was added: Accepted Engineering Practice . The performance design of structures and/or structural elements that vary from prescriptive design methods of this code. Such design shall be made with accepted design standards by a South Carolina licensed Architect or Engineer as permitted by existing state law. 22 2024 Building Code Modification Index (11/3/2025 V.1) Page 97 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 02 Code Section: R202 Definitions: Crawl Space Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 02 R202 Reason: To provide additional clarification. Modification: R202 Definitions [RB] CRAWL SPACE. An underfloor space that is not a basement. Spaces under decks and porches that do not contain mechanical equipment and are separated by a foundation wall are not to be considered crawlspaces. 23 2024 Building Code Modification Index (11/3/2025 V.1) Page 98 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 03 Code Section: R202 Definitions: Sleeping Loft R.310.3 Location R314.1 General Section R315 Sleeping Lofts R319.1 Emergency escape and rescue opening required Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: The section is overly restrictive, hard to apply and duplicates existing safety rules. Modification: R202 Definitions [RB] SLEEPING LOFT. A space designated for sleeping on an intermediate level or levels between the floor and ceiling of a story, open on one or more sides to the room in which the space is located, and in accordance with Section R315. (delete section without substitution) R310.3 Location. Smoke alarms shall be installed in the following locations: 1. In each sleeping room. 2. Outside each separate sleeping area in the immediate vicinity of the bedrooms. 3. On each additional story of the dwelling unit, including basements and habitable attics and not including crawl spaces and uninhabita ble attics. In dwelling units with split levels and without an intervening door between the adjacent levels, a smoke alarm installed on the upper level shall suffice for the adjacent lower level provided that the lower level is less than one full story below the upper level. 4. Not less than 3 feet (914 mm) horizontally from the door or opening of a bathroom that contains a bathtub or shower unless this would prevent placement of a smoke alarm required by this section. 5. In the hallway and in the room open to the hallway in dwelling units where the ceiling height of a room open to a hallway serving bedrooms exceeds that of the hallway by 24 inches (610 mm) or more. 6. Within the room to which a sleeping loft is open, in the immediate vicinity of the sleeping loft . 24 2024 Building Code Modification Index (11/3/2025 V.1) Page 99 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index (page 2 of IRC 2024 03 - R202, R310.1, etc.) R314.1 General. Mezzanines shall comply with Sections R314.2 through R314.5. Exception: Sleeping lofts in dwelling units and sleeping units shall be permitted to comply with Section R315, subject to the limitations in Section R315.2. SECTION R315 SLEEPING LOFTS (Delete section without substitution) R319.1 Emergency escape and rescue opening required. Basements, habitable attics, the room to which a sleeping loft is open, and every sleeping room shall have not less than one operable emergency escape and rescue opening . Where basements contain one or more sleeping rooms, an emergency escape and rescue opening shall be required in each sleeping room. Emergency escape and rescue openings shall open directly into a public way, or to a yard or court that opens to a public way. Exceptions: 1. Basements used only to house mechanical equipment not exceeding a total floor area of 200 square feet (18.58 m2). 2. Storm shelters constructed in accordance with ICC 500. 3. Where the dwelling unit or townhouse unit is equipped with an automatic sprinkler system installed in accordance with Section P2904, sleeping rooms in basements shall not be required to have emergency escape and rescue openings provided that the basement has one of the following: 3.1. One means of egress complying with Section R318 and one emergency escape and rescue opening. 3.2. Two means of egress complying with Section R318. 4. A yard shall not be required to open directly into a public way where the yard opens to an unobstructed path from the yard to the public way. Such path shall have a width of not less than 36 inches (914 mm). 25 2024 Building Code Modification Index (11/3/2025 V.1) Page 100 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 04 Code Section: R301.2.1 Wind design criteria Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 04 Reason: Provides added consistency and ease. Modification: R301.2.1 Wind design criteria. Buildings and portions thereof shall be constructed in accordance with the wind provisions of this code using the ultimate design wind speed in Table R301.2 as determined from Figure R301.2(2) American Society of Civil Engineers (ASCE) Hazard Tool. The local building official may delineate the wind design category within their jurisdiction, as long as, it does not surpass those provided on the American Society of Civil Engineers (ASCE) Hazard Tool website. The structural provisions of this code for wind loads are not permitted where wind design is required as specified in Section R301.2.1.1. Where different construction methods and structural materials are used for various portions of a building, the applicable requirements of this section for each portion shall apply. Where not otherwise specified, the wind loads listed in Table R301.2.1(1) adjusted for height and exposure using Table R301.2.1(2) shall be used to determine design load performance requirements for wall coverings, curtain walls, roof coverings, exterior windows, skylights, garage doors and exterior doors. Asphalt shingles shall be designed for wind speeds in accordance with Section R905.2.4 . Metal roof shingles shall be designed for wind speeds in accordance with Section R905.4.4. A continuous load path shall be provided to transmit the applicable uplift forces in Section R802.11 from the roof assembly to the foundation. Where ultimate design wind speeds in Figure R301.2(2) are less than the lowest wind speed indicated in the prescriptive provisions of this code, the lowest wind speed indicated in the prescriptive provisions of this code shall be used. 26 2024 Building Code Modification Index (11/3/2025 V.1) Page 101 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 05 Code Section: R301.2.2 Seismic provisions Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: The structural requirements add cost without significant safety benefit in low -to-moderate seismic rick areas. Modification: (removes “C” from #1 below) R301.2.2 Seismic provisions. Buildings within the scope of this code as defined in Section R101.2 shall be constructed in accordance with the requirements of this section and other seismic requirements of this code. The seismic provisions of this code shall apply as follows: 1. Townhouses and buildings as permitted by the exceptions to Section R101.2 containing three or more dwelling units in Seismic Design Categories C, D0, D 1 and D2. 2. Detached one- and two-family dwellings and buildings as permitted by the exceptions to Section R101.2 containing less than three dwelling units in Seismic Design Categories D0, D 1 and D2. Buildings in Seismic Design Category E shall be designed to resist seismic loads in accordance with the International Building Code , except where the seismic design categ ories are reclassified to lower seismic design categories in accordance with Section R301.2.2.1. Components of buildings not required to be designed to resist seismic loads shall be constructed in accordance with the provisions of this code. 27 2024 Building Code Modification Index (11/3/2025 V.1) Page 102 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 06 Code Section: R301.2.2.1 Determination of seismic design category Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 04 Reason: Provides added consistency and ease. Modification: R301.2.2.1 Determination of seismic design category. Buildings shall be assigned a seismic design category in accordance with the American Society of Civil Engineers (ASCE) Hazard Tool . Figures R301.2.2.1(1) through R301.2.2.1(7), except as otherwise required by Section R401.4. The local building official may delineate the seismic design category within the jurisdiction, as long as, it does not surpass those provided on the American Society of Civil Engineers (ASCE) Hazard Tool website. 28 2024 Building Code Modification Index (11/3/2025 V.1) Page 103 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 07 Code Section: R302.1 Exterior Walls (adds exception #6) Proponent: Coastal Code Enforcement Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 06 R302.1 IRC 2018 IRC 2018 04 R302.1 IRC 2015 IRC 2015 01 R302.1 IRC 2012 IRC 2012 02 R302.1 Reason: To provide a clear definition and uniform interpretation of the phrase Modification: R302.1 Exterior walls. Construction, projections, openings and penetrations of exterior walls of dwellings, townhouses and accessory buildings shall comply with Table R302.1(1) based on fire separation distance; or dwellings and townhouses equipped throughout with an automatic sprinkler system installed in accordance with Section P2904 shall comply with Table R302.1(2) based on fire separation distance. For the purposes of determining fire separation distance, dwellings and townhouses on the same lot shall be assumed to have an imaginary line between them. Where a new dwelling or townhouse is to be erected on the same lot as an existing dwelling or townhouse, the location of the assumed imaginary line with relation to the existing dwelling or townhouse shall be such that the exist ing dwelling or townhouse meets requirements of this section. Where a lot line exists between adjacent townhouse units, fire separation distance of exterior walls shall be measured to the lot line. Where a lot line does not exist between adjacent townhouse units, an imaginary line shall be assumed between the adjacent townhouse units and fire separation distance of exterior walls shall be measured to the imaginary line. Fire separation distance and requirements of Section R302.1 shall not apply to walls separating townhouse units that are required by Section R302.2. Exceptions: 1. Walls, projections, openings or penetrations in walls perpendicular to the line used to determine the fire separation distance. 2. Walls of individual dwelling units and their accessory buildings located on the same lot. 3. Detached tool sheds and storage sheds, playhouses and similar structures exempted from permits are not required to provide wall protection based on location on the lo t. Projections beyond the exterior wall shall not extend over the lot line. 29 2024 Building Code Modification Index (11/3/2025 V.1) Page 104 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index (page 2 of IRC 2024 07- R302.1) 4. Detached garages accessory to a dwelling unit located within 2 feet (610 mm) of a lot line are permitted to have roof eave projections not exceeding 4 inches (102 mm). 5. Foundation vents installed in compliance with this code are permitted. 6. Fire separation distance. a. The minimum fire separation distance for improvement constructed on a lot shown on: [ i ] a recorded bonded or final subdivision plat, or [ii] a sketch plan, site plan, plan of phased development or preliminary plat approved by the local governing authority, which was recorded or approved prior to the implementation of 2012 International Residential Code and which shows or describes lesser setbacks than the fire separation distances provided in Table R302.1(1), shall be equal to the lesser setbacks, but in no event less than 3 feet (914 mm). b. The minimum fire separation distance for improvements constructed on a lot where the local governing authority has, prior to the implementation of 2012 International Residential Code: [ i ] accepted exactions or issued conditions, [ ii ] granted a special exception, [ iii ] entered into a development agreement, [ iv ] approved a variance, [ v ] approved a planned development district, or [ vi ] otherwise approved a specific development plan which contemplated or provided for setbacks less than the fire separation distances provided in Table R302.1(1), shall be equal to the lesser setback, but in no event less than 3 feet (914 mm). 30 2024 Building Code Modification Index (11/3/2025 V.1) Page 105 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 08 Code Section: R302.1 Exterior Walls (adds exception #7) Proponent: Building Official’s Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 06 R302.1 Reason: To account for eave projections on townhomes. Modification: (Modification adds below exception to prior modification IRC 2024 07 for Section R302.1 Exterior walls) Exceptions: 7. Aesthetic roof and siding projections may extend beyond the common wall of a townhouse unit over an adjoining unit's property line as long as the construction of the projection does not damage the integrity of the fire -rated assembly, the projection is completely supported by the common wall, the projection is protected by a 1 -hour construction or fire retardant -treated wood, and the projection is limited to 18 inches (457 mm). These projections shall not contain any plumbing, electrical or mechanical installations. An easement may be required by the jurisdiction to ensure future access to this projection for repair and maintenance. 31 2024 Building Code Modification Index (11/3/2025 V.1) Page 106 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 09 Code Section: R302.2.7 Meter Location (new section) Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: Provides design and installation flexibility. Aligns with utility company practices and NEC requirements. Maintains fire-resistance integrity of common walls. Clarifies enforcement for local building officials and reduces conflicts during plan review. Modification: R.302.2.7 Meter Location. Installation of multiple electrical meters on the exterior wall of townhomes is permitted, provided the installation does not breach the fire-resistance-rated wall assembly. 32 2024 Building Code Modification Index (11/3/2025 V.1) Page 107 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 10 Code Section: R302.4.1 Through penetrations Proponent: Building Official’s Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 09 R302.4.1 Reason: The common walls between townhouses are essentially property lines between adjacent owners, and utilities or services of any kind should not pass through a property line. Modification: R302.4.1 Through penetrations. Through penetrations of fire-resistance-rated wall or floor assemblies shall comply with Section R302.4.1.1 or R302.4.1.2. No penetrations shall pass completely through the fire-rated assembly separating townhouse units. Exceptions: 1. Where the penetrating items are steel, ferrous or copper pipes, tubes or conduits, the annular space shall be protected as follows: 1.1. In concrete or masonry wall or floor assemblies, concrete, grout or mortar shall be permitted where installed to the full thickness of the wall or floor assembly or the thickness required to maintain the fire-resistance rating, provided that both of the following are complied with: 1.1.1. The nominal diameter of the penetrating item is not more than 6 inches (152 mm). 1.1.2. The area of the opening through the wall does not exceed 144 square inches (92 900 mm2). 1.2. The material used to fill the annular space shall prevent the passage of flame and hot gases sufficient to ignite cotton waste where subjected to ASTM E119 or UL 263 time temperature fire conditions under a positive pressure differential of not less than 0.01 inch of water (3 Pa) at the location of the penetration for the time period equivalent to the fire -resistance rating of the construction penetrated. 2. The annular space created by the penetration of water -filled fire sprinkler piping, provided that the annular space is filled using a material complying with Item 1.2 of Exception 1. 33 2024 Building Code Modification Index (11/3/2025 V.1) Page 108 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 11 Code Section: R302.5.1 Opening protection Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 10 R302.5.1 IRC 2018 IRC 2018 05 R302.5.1 IRC 2015 IRC 2015 05 R302.5.1 Reason: Lack of supporting documentation proving that self -closing devices contribute to fire or carbon monoxide safety. Modification: R302.5.1 Opening protection. Openings from a private garage directly into a room used for sleeping purposes shall not be permitted. Other openings between the garage and dwelling unit shall be equipped with solid wood doors not less than 1 3/8 inches (35 mm) in thickness, solid or hon eycomb-core steel doors not less than 1 3/8 inches (35 mm) thick, or 20-minute fire-rated doors. Doors shall be self-latching and equipped with a self-closing or automatic-closing device. 34 2024 Building Code Modification Index (11/3/2025 V.1) Page 109 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 12 Code Section: R302.13 Fire protection of floors Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 11 R302.13 IRC 2018 IRC 2018 06 R302.13 IRC 2015 IRC 2015 06 R302.13 Reason: Requirements are unwarranted and unnecessary. Modification: R302.13 Fire protection of floors. Floor assemblies that are not required elsewhere in this code to be fire- resistance rated, shall be provided with a 1/2-inch (12.7 mm) gypsum wallboard membrane, 5/8-inch (16 mm) wood structural panel membrane, or equivalent on the underside of the floor f raming member. Penetrations or openings for ducts, vents, electrical outlets, lighting, devices, luminaires, wires, speakers, drainage, piping and similar openings or penetrations shall be permitted. Exceptions: 1. Floor assemblies located directly over a space protected by an automatic sprinkler system in accordance with Section P2904, NFPA 13D, or other approved equivalent sprinkler system. 2. Floor assemblies located directly over a crawl space not intended for storage or for the installation of fuel-fired or electric-powered heating appliances. Floor assemblies located directly over a crawl space. 3. Portions of floor assemblies shall be permitted to be unprotected where complying with the following: 3.1. The aggregate area of the unprotected portions does not exceed 80 square feet (7.4 m2) per story. 3.2. Fireblocking in accordance with Section R302.11.1 is installed along the perimeter of the unprotected portion to separate the unprotected portion from the remainder of the floor assembly. 4. Wood floor assemblies using dimension lumber or structural composite lumber equal to or greater than 2-inch by 10-inch (50.8 mm by 254 mm) nominal dimension, or other approved floor assemblies demonstrating equivalent fire performance. 5. Wood floor assemblies less than 600 square feet (55.7 m2) within detached accessory structures with no habitable space above them. 35 2024 Building Code Modification Index (11/3/2025 V.1) Page 110 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 13 Code Section: 304.1.1 Field treatment Proponent: Structural Engineers Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 22 R317.1.1 IRC 2018 IRC 2018 14 R317.1.1 IRC 2015 IRC 2015 13 R317.1.1 IRC 2012 IRC 2012 12 R317.1.1 Reason: To add the preservative-treated wood product manufacturer’s field treatment recommendations as a method of compliance. Modification: R304.1.1 Field treatment. Field-cut ends, notches and drilled holes of preservative-treated wood shall be treated in the field in accordance with AWPA M4 or in accordance with the preservative-treated wood product manufacturer’s recommendations. 36 2024 Building Code Modification Index (11/3/2025 V.1) Page 111 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 14 Code Section: R305.1 Subterranean termite control methods Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 23 318.1 IRC 2018 IRC 2018 15 318.1 Reason: Provides clarification that additional treatment methods are permissible if it adheres to Section 27-1085 of the Rules and Regulations for the Enforcement of the South Carolina Pesticide Control Act and enforced by the Clemson University Department of Pesticide Regulations. Modification: R305.1 Subterranean termite control methods. In areas subject to damage from termites as indicated by Table R301.2 , protection shall be by one, or a combination, of the following methods: 1. Chemical termiticide treatment in accordance with Section R305.2. 2. Termite-baiting system installed and maintained in accordance with the label. 3. Pressure-preservative-treated wood in accordance with the provisions of Section R304.1. 4. Naturally durable termite-resistant wood. 5. Physical barriers in accordance with Section R305.3 and used in locations as specified in Section R304.1. 6. Cold-formed steel framing in accordance with Sections R505.2.1 and R603.2.1. 7. Treatments may be conducted as outlined in Section 27-1085 of the Rules and Regulations for the Enforcement of the South Carolina Pesticide Control Act and enforced by the Clemson University Department of Pesticide Regulation. 37 2024 Building Code Modification Index (11/3/2025 V.1) Page 112 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 15 Code Section: R305.4 Foam Plastic Protection Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 24 R318.4 IRC 2018 IRC 2018 16 R318.4 Reason: Provided language establishes a best management practice in order to inspect for termites and other wood-destroying organisms. The exception should be deleted due to a lack of rigorous experimental investigation and robust data to indicate a foam insulation product can be treated or produced in a way to make the product 100 % effective against subterranean termite damage or an effective barrier to prevent termites a route into a structure. Modification: R305.4 Foam plastic protection. In areas where the probability of termite infestation is “very heavy” as indicated in Figure R305.4, extruded and expanded polystyrene, polyisocyanurate and other foam plastics shall not be installed on the exterior face or under interior or exterior foundation walls or slab foundations located below grade. The clearance between foam plastics installed above grade and exposed earth shall be not less than 6 inches (152 mm). For crawl space applications, foam plastic shall be installed so as to provide a termite inspection gap of no less than 6 inches (152 mm) along the top of the foundation w all and foundation sill plate. Exceptions: 1. Buildings where the structural members of walls, floors, ceilings and roofs are entirely of noncombustible materials or pressure-preservative-treated wood. 2.Where in addition to the requirements of Section R318.1, an approved method of protecting the foam plastic and structure from subterranean termite damage is used. 3.2. On the interior side of basement walls. 38 2024 Building Code Modification Index (11/3/2025 V.1) Page 113 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 16 Code Section: R305.5 Termite inspection strip Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 25 R318.5 Reason: Provides added consistency and ease for inspections Modification: R305.5 Termite inspection strip. Where foam plastic is applied in accordance with Section R318.4 , a continuous 6 -inch (152 mm) strip centered along the sill plate shall be left open for termite activity inspection. 39 2024 Building Code Modification Index (11/3/2025 V.1) Page 114 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 17 Code Section: R309 Automatic Sprinkler Systems Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 18 R313 IRC 2018 IRC 2018 12 R313 IRC 2015 IRC 2015 12 R313 IRC 2012 IRC 2012 10 R313.1 IRC 2012 IRC 2012 11 R313.2 Reason: Unusually restrictive Modification: SECTION R309 AUTOMATIC FIRE SPRINKLER SYSTEMS R309.1 Townhouse automatic fire sprinkler systems. An automatic residential fire sprinkler system shall not be required to be installed in townhouses when constructed in accordance with Section R302.2. Exception: An automatic residential fire sprinkler system shall not be required where additions or alterations are made to existing townhouses that do not have an automatic residential fire sprinkler system installed. R309.1.1 Design and installation. Automatic residential fire sprinkler systems for townhouses when installed shall be designed and installed in accordance with Section P2904 or NFPA 13D. R309.2 One- and two-family dwellings automatic sprinkler systems. An automatic residential fire sprinkler system shall be installed shall not be required to be installed in one- and two-family dwellings. Exception: An automatic sprinkler system shall not be required for additions or alterations to existing buildings that are not already provided with a sprinkler system. R309.2.1 Design and installation. Automatic residential fire sprinkler systems when installed shall be designed and installed in accordance with Section P2904 or NFPA 13D. 40 2024 Building Code Modification Index (11/3/2025 V.1) Page 115 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 18 Code Section: R316.3 Story above grade plane Proponent(s): Home Builders Association of South Carolina (2021) and Building Officials Association of South Carolina (2024) Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 29 R326.3 Reason: The deletions bring the definition of the habitable attic in line with the 2018 IRC. Modification: R316.3 Story above grade plane. A habitable attic shall be considered a story above grade plane. Exceptions: A habitable attic shall not be considered to be a story above grade plane provided that the habitable attic meets all the following: 1. The aggregate area of the habitable attic is either of the following: 1.1. Not greater than one-third one-half of the floor area of the story below. 1.2. Not greater than one-half of the floor area of the story below where the habitable attic is located within a dwelling unit equipped with an automatic fire sprinkler system in accordance with Section P2904. 2. The occupiable space is enclosed by the roof assembly above, knee walls, if applicable, on the sides and the floor- ceiling assembly below. 3. The floor of the habitable attic does not extend beyond the exterior walls of the story below. 4. Where a habitable attic is located above a third story, an automatic sprinkler system in accordance with Section P2904 shall be installed in the habitable attic and remaining portion of the townhouse unit or dwelling unit or units located beneath the habitable attic. 41 2024 Building Code Modification Index (11/3/2025 V.1) Page 116 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 19 Code Section: R318.3.1 Floor elevations at the required egress doors Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: Replacing “threshold” with “primary floor level” provides clarity for enforcement and design. “Threshold” can vary by product, while “primary floor level” offers a consistent, measurable reference. Modification: R318.3.1 Floor elevations at the required egress doors. Landings or finished floors at the required egress door shall be not more than 1 1/2 inches (38 mm) lower than the top of the threshold primary floor level. Exception: The landing or floor on the exterior side shall be not more than 7 3/4 inches (196 mm) below the top of the threshold provided that the door does not swing over the landing or floor. Where exterior landings or floors serving the required egress door are not at grade, they shall be provided with access to grade by means of a ramp in accordance with Section R318.8 or a stairway in accordance with Section R318.7. 42 2024 Building Code Modification Index (11/3/2025 V.1) Page 117 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 20 Code Section: R318.7.5.1 Risers Proponent: Structural Engineers Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 15 R311.7.5.1 IRC 2018 IRC 2018 09 R311.7.5.1 IRC 2015 IRC 2015 09 R311.7.5.1 IRC 2012 IRC 2012 07 R311.7.5.1 Reason: To establish a maximum height for masonry risers Modification: R318.7.5.1 Risers. The maximum riser height shall be not more than 7 3/4 inches (196 mm). The maximum riser height for masonry stairs shall be 8 inches (203 mm). The riser height shall be measured vertically between leading edges of the adjacent treads. The greatest riser height within any flight of stairs shall not exceed the smallest by more than 3/8 inch (9.5 mm). Risers shall be vertical or sloped from the underside of the nosing of the tread above at an angle not more than 30 degrees (0.51 rad) from the vertical. At open risers, openings located more than 30 inches (762 mm), as measured vertically, to the floor or grade below shall not permit the passage of a 4- inch-diameter (102 mm) sphere. Exceptions: 1. The opening between adjacent treads is not limited on spiral stairways. 2. The riser height of spiral stairways shall be in accordance with Section 318.7.11.1. 3. The opening between adjacent treads is not limited on stairs with a total rise of 30 inches (762 mm) or less. 43 2024 Building Code Modification Index (11/3/2025 V.1) Page 118 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 21 Code Section: R321.1.1 Where required Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 16 R312.1.1 IRC 2018 IRC 2018 10 R312.1.1 IRC 2015 IRC 2015 10 R312.1.1 IRC 2012 IRC 2012 08 R312.1.1 Reason: No technical justification to substantiate a 36-inch measurement away from the leading edge of the walking surface or tread to determine when a guard should be required. Modification: R321.1.1 Where required. Guards shall be provided for those portions of open -sided walking surfaces, including floors, stairs, ramps and landings that are located more than 30 inches (762 mm) measured vertically to the floor or grade below at any point within 36 inches (914 mm) horizontally to the edge of the open side. Insect screening shall not be considered as a guard. Guards shall be located along open -sided walking surfaces of all decks, porches, balconies, floors, stairs, ramps and landings that are located more than 30 inches (762 mm) measured vertically to the floor or grade below; and at any point where a downward slope exceeds 3V:12H within 36 inches (914 mm) horizontally to the edge of the open side. Insect screening shall not be considered as a guard. 44 2024 Building Code Modification Index (11/3/2025 V.1) Page 119 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 22 Code Section: R321.2 Window fall protection Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 17 R312.2 IRC 2018 IRC 2018 11 R312.2 IRC 2015 IRC 2015 11 R312.2 IRC 2012 IRC 2012 09 R312.2 Reason: Unusually restrictive Modification: (Delete without substitution) R321.2 Window fall protection. Window fall protection shall be provided in accordance with Sections R321.2.1 and R321.2.2. R321.2.1 Window opening height. In dwelling units, where the bottom of the clear opening of an operable window opening is located less than 24 inches (610 mm) above the finished floor and greater than 72 inches (1829 mm) above the finished grade or other surface below on the exterior of the building, the operable window shall comply with one of the following: 1. Operable window openings will not allow a 4 -inch-diameter (102 mm) sphere to pass through where the openings are in their largest opened position. 2. Operable windows are provided with window opening control devices or fall prevention devices that comply with ASTM F2090. R321.2.2 Emergency escape and re scue openings. Where an operable window serves as an emergency escape and rescue opening, a window opening control device or fall prevention device, after operation to release the control device or fall prevention device allowing the window to fully open, shall not reduce the net clear opening area of the window unit to less than the area required by Sections R319.2.1 and R319.2.2. 45 2024 Building Code Modification Index (11/3/2025 V.1) Page 120 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 23 Code Section: R325.3 Mechanical ventilation Proponent: Coastal Code Enforcement Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 12 R303.4 IRC 2018 IRC 2018 07 R303.4 IRC 2015 IRC 2015 07 R303.4 IRC 2012 IRC 2012 05 R303.4 Reason: The blower door test is not required with the current State Energy Standard (2009 International Energy Conservation Code) and is not applicable. Modification: (Delete without substitution) R303.4 Mechanical ventilation. Buildings and dwelling units complying with Section 1102.5.1 shall be provided with mechanical ventilation in accordance with Section M1505, or with other approved means of ventilation. 46 2024 Building Code Modification Index (11/3/2025 V.1) Page 121 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 24 Code Section: Figure R327.1 Minimum Fixture Clearances Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 13 R307.1 IRC 2018 IRC 2018 08 R307.1 IRC 2015 IRC 2015 08 R307.1 IRC 2012 IRC 2012 06 R307.2 IRC 2006 IRC 2006 09 R307.2 IRC 2003 IRC 2003 05 R307.2 Reason: No valid reason exists to justify a minimum clearance of 15 inches Modification: Change the minimum dimension for the side clearance between bathtubs and water closets or bidets from 15 inches to 12 inches. 47 2024 Building Code Modification Index (11/3/2025 V.1) Page 122 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 25 Code Section: R404.1.9.2 Masonry piers supporting floor girders Proponent: Home Builders Association of South Carolina and Structural Engineers Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 31 R404.1.9.2 IRC 2018 IRC 2018 20 R404.1.9.2 IRC 2015 IRC 2015 16 R404.1.9.2 IRC 2012 IRC 2012 13 R404.1.9.2 Reason: Unusually restrictive Modification: R404.1.9.2 Masonry piers supporting floor girders. Masonry piers supporting wood girders sized in accordance with Tables R602.7(1) and R602.7(2) shall be permitted in accordance with this section. Piers supporting girders for interior bearing walls shall have a minimum nominal dimension of 12 inches (305 mm) and a maximum height of 10 feet (3048 mm) be filled solidly with grout or type M or S mort ar and shall have a minimum nominal dimension of 8 inches (203 mm) and a maximum height not exceeding 10 times the nominal thickness from top of footing to bottom of sill plate or girder. Piers supporting girders for exterior bearing walls shall have a min imum nominal dimension of 12 inches (305 mm) and a maximum height of 4 feet (1220 mm) from top of footing to bottom of sill plate or girder. Piers supporting beams and girders for exterior bearing walls shall be filled solidly with grout or type M or S mor tar; shall contain a minimum of one #4 (13 mm) dowel mid -depth; and shall have a minimum nominal dimension of 8 inches (203 mm) and a maximum height of 4 times the nominal thickness from top of footing to bottom of sill plate or girder unless it can be sho wn by accepted engineering practice that there is sufficient foundation wall along the foundation line to resist the imposed lateral loads, in which case the maximum height shall not exceed 10 times the nominal thickness. Girders and sill plates shall be anchored to the pier or footing in accordance with Section R403.1.6 or Figure R404.1.5.3. Floor girder bearing shall be in accordance with Section R502.6. 48 2024 Building Code Modification Index (11/3/2025 V.1) Page 123 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 26 Code Section: R408.3 Unvented Crawl Space Proponent: Structural Engineers Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 32 R408.3 IRC 2018 IRC 2018 21 R408.3 Reason: ASTM E1745 is the industry standard for plastic vapor retarders used under concrete slabs or in contact with soil. It is also the main standards for evaluating plastic films that will be used in this application. Three performance classes are outlined A, B and C (with Class A being the strongest). Performance levels are the same for each class, less than 0.1 perms. Tensile strength and puncture resistance change with each class. ASTM E1745 refers to ASTM E154 “Standard Test Methods for Water Vapor Retarders Used in Contact with Earth Under Concrete Slabs, On Walls or as Ground Cover”, which describes test methods for testing the performance of a plastic film after it is subjected to certain elements. These standards outline the methodology whereby plastic vapor retarders are tested. Simply having a low perm rating is not enough when it comes to real-life conditions. Vapor retarders/barriers must also be tough enough to endure the rigors of construction, since this will determine their true long-term ability to protect against water vapor intrusion. Modification: R408.3 Unvented crawl space. For unvented under-floor spaces, the following items shall be provided: 1. Exposed earth shall be covered with a continuous Class I vapor retarder meeting ASTM E1745 Class A. Joints of the vapor retarder shall overlap by 6 inches (152 mm) and shall be sealed or taped. The edges of the vapor retarder shall extend not less than 6 inches (152 mm) up the stem wall and shall be attached and sealed to the stem wall or insulation. 2. One of the following shall be provided for the under-floor space: 2.1. Continuously operated mechanical exhaust ventilation at a rate equal to 1 cubic foot per minute (0.47 L/s) for each 50 square feet (4.7m 2) of crawl space floor area, including an air pathway to the common area (such as a duct or transfer grille), and perimeter walls insulated in accordance with Section N1102.2.11.1. 2.2. Conditioned air supply sized to deliver at a rate equal to 1 cubic foot per minute (0.47 L/s) for each 50 square feet (4.7 m2) of under-floor area, including a return air pathway to the common area (such as a duct or transfer grille), and perimeter walls insulated in accordance with Section N1102.2.11.1. 2.3. Plenum in existing structures complying with Section M1601.5, if under -floor space is used as a plenum. 2.4. Dehumidification sized in accordance with manufacturer's specifications. 49 2024 Building Code Modification Index (11/3/2025 V.1) Page 124 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 27 Code Section: R408.3 Unvented Crawl Space Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 33 R408.3 IRC 2018 IRC 2018 21 R408.3 Reason: Provides added clarity and consistency of codes between regulation and statute. Modification: R408.3 Unvented crawl space. For unvented under-floor spaces, the following items shall be provided: 1. Exposed earth shall be covered with a continuous vapor retarder meeting ASTM E1745 Class A. Joints of the vapor retarder shall overlap by 6 inches (152 mm) and shall be sealed or taped. The edges of the vapor retarder shall extend not less than 6 inches (152 mm) up the stem wall and shall be attached and sealed to the stem wall or insulation. 2. One of the following shall be provided for the under-floor space: 2.1. Continuously operated mechanical exhaust ventilation at a rate equal to 1 cubic foot per minute (0.47 L/s) for each 50 square feet (4.7m2) of crawl space floor area, including an air pathway to the common area (such as a duct or transfer grille), and perimeter walls insulated in accordance with Section N1102.2.11.1 the South Carolina Energy Standard Act. 2.2. Conditioned air supply sized to deliver at a rate equal to 1 cubic foot per minute (0.47 L/s) for each 50 square feet (4.7 m2) of under-floor area, including a return air pathway to the common area (such as a duct or transfer grille), and perimeter walls insulated in accordance with Section N1102.2.11.1 the South Carolina Energy Standard Act. 2.3. Plenum in existing structures complying with Section M1601.5, if under-floor space is used as a plenum. 2.4. Dehumidification sized in accordance with manufacturer's specifications. 50 2024 Building Code Modification Index (11/3/2025 V.1) Page 125 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 28 Code Section: R408.4 Access Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 34 R408.4 IRC 2018 IRC 2018 22 R408.4 IRC 2015 IRC 2015 17 R408.4 Reason: To allow access openings under a doorway Modification: R408.4 Access. Access shall be provided to all under-floor spaces. Access openings through the floor shall be not smaller than 18 inches by 24 inches (457 mm by 610 mm). Openings through a perimeter wall shall be not less than 16 inches by 24 inches (407 mm by 610 mm). W here any portion of the through - wall access is below grade, an areaway not less than 16 inches by 24 inches (407 mm by 610 mm) shall be provided. The bottom of the areaway shall be below the threshold of the access opening. Through wall access openings shall not be located under a door to the residence. See Section M1305.1.3 for access requirements where mechanical equipment is located under floors. 51 2024 Building Code Modification Index (11/3/2025 V.1) Page 126 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 29 Code Section: R408.8 Under floor vapor retarder Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 35 R408.4 Reason: Application is not practical. Modification: (Section deleted without substitution) R408.8 Under -floor vapor retarder. In Climate Zones 1A, 2A and 3A below the warm -humid line, a continuous Class I or II vapor retarder shall be provided on the exposed face of air-permeable insulation installed between the floor joists and exposed to the grade in the under -floor space. The vapor retarder shall have a maximum water vapor permeance of 1.5 perms when tested in accordance with Procedure B of ASTM E96. Exception: The vapor retarder shall not be required in unvented crawl spaces constructed in accordance with Section R408.3. 52 2024 Building Code Modification Index (11/3/2025 V.1) Page 127 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 30 Code Section: R502.12.4 Truss design drawings Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 36 R502.11.4 IRC 2018 IRC 2018 23 R502.11.4 IRC 2015 IRC 2015 18 R502.11.4 IRC 2012 IRC 2012 14 R502.11.4 IRC 2006 IRC 2006 21 R502.11.4 IRC 2003 IRC 2003 17 R502.11.4 Reason: The section was modified to allow the approval of truss design drawings by local building officials to occur at the time of the framing inspection, rather than at an undefined time prior to installation. Modification: R502.12.4 Truss design drawings. Truss design drawings , prepared in compliance with Section R502.12.1, shall be submitted to the building official and approved prior to installation at the time of their inspection. Truss design drawings shall be provided with the shipment of trusses delivered to the job site. Truss design drawings shall include, at a minimum, the information specified as follows: (No changes to items 1-12) 53 2024 Building Code Modification Index (11/3/2025 V.1) Page 128 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 31 Code Section: R506.3.3 Vapor retarder Proponent: Structural Engineers’ Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 37 R506.2.3 IRC 2018 IRC 2018 24 R506.2.3 IRC 2015 IRC 2015 19 R506.2.3 Reason: It is a fairly common practice for garages to be transformed into conditioned space at which time having a vapor retarder becomes necessary, or to be converted to storage space (over 70 sq. ft.) at which time a vapor barrier is required. Modification: R506.3.3 Vapor retarder. A minimum 6 mil (0.006 inch; 152 μm) polyethylene or approved vapor retarder with joints lapped not less than 6 inches (152 mm) shall be placed between the concrete floor slab and the base course or the prepared subgrade where a base course does not exist. Exception: The vapor retarder is not required for the following: 1. Garages, utility buildings and other unheated accessory structures. 2. For unheated storage rooms having an area of less than 70 square feet (6.5 m2) and carports. 3. Driveways, walks, patios and other flatwork not likely to be enclosed and heated at a later date. 4. Where approved by the building official, based on local site conditions. 54 2024 Building Code Modification Index (11/3/2025 V.1) Page 129 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 32 Code Section: R606.7 Piers Proponent: Structural Engineers’ Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 38 R606.7 IRC 2018 IRC 2018 25 R606.7 IRC 2015 IRC 2015 20 R606.7 Reason: To allow the use of only type M or S mortar to comply with ACI 530 which disallows the use of type N mortar in foundation walls. Modification: R606.7 Piers. The unsupported height of masonry piers shall not ex ceed 10 times their least dimension. Where structural clay tile or hollow concrete masonry units are used for isolated piers to support beams and girders, the cellular spaces shall be filled solidly with grout or Type M or S mortar, except that unfilled hollow piers shall be permitted to be used if their unsupported height is not more than four times their least dimension. Where hollow masonry units are solidly filled with grout or Type M or S or N mortar, the allowable compressive stress shall be permitted to be increased as provided in Table R606.9. 55 2024 Building Code Modification Index (11/3/2025 V.1) Page 130 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 33 Code Section: R802.10.1 Truss design drawings Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 39 R802.10.1 IRC 2018 IRC 2018 26 R802.10.1 IRC 2015 IRC 2015 21 R802.10.1 Reason: The section was modified to allow the approval of truss design drawings by local building officials to occur at the time of the framing inspection, rather than at an undefined time prior to installation. Modification: R802.10.1 Truss design drawings. Truss design drawings, prepared in conformance to Section R802.10.1, shall be provided to the building official and approved prior to installation at the time of their inspection. Truss design drawings shall be provided with the shipment of trusses delivered to the job site. Truss design drawings shall include, at a minimum, the following information: (No changes to items 1-12) 56 2024 Building Code Modification Index (11/3/2025 V.1) Page 131 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 34 Code Section: Table R905.1.1(2) Underlayment application Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: Current high -wind underlayment requirements are prescriptive and may not reflect the performance capabilities of modern materials. Removing this section allows evaluation based on the actual performance rating of underpayments as s econdary moisture barriers, rather than mandating specific installation methods. This encourages innovation, simplifies compliance, and ensures the focus remains on tested results, not rigid procedures. Modification: ***In Table R905.1.1(2) for asphalt shingles, the last column for “Areas Where Wind Design is Required in Accordance with Figure R.301.2.1.1” is changed to match the requirements in the column for “Areas Where Wind Design is Not Required in Accordance with Figure R. 301.2.1.1. TABLE R905.1.1(2) UNDERLAYMENT APPLICATION Roof Covering: Asphalt Shingles SECTION: R905.2 AREAS WHERE WIND DESIGN IS REQUIRED IN ACCORDANCE WITH FIGURE R301.2.1.1: Underlayment shall be one of the following: 1. Two layers of mechanically fastened underlayment applied in the following manner: Apply a strip of underlayment that is half the width of a full sheet parallel to and starting at the eaves, fastened sufficiently to hold in place. Starting at the eave, apply full-width sheets of underlayment, overlapping successive sheets half the width of a full sheet plus 2 inches. Distortions in the underlayment shall not interfere with the ability of the shingles to seal. End laps shall be 4 inches and shall be offset by 6 feet. 2. A minimum 4 -inch-wide strip of self -adhering polymer modified bitumen underlayment complying with ASTM D1970, installed in accordance with the manufacturer’s installation instructions for the deck material, shall be applied over all joints in the roof decking. An approved underlayment complying with Table R905.1.1(1) for the applicable roof covering shall be app lied over the entire roof over the 4-inch- wide membrane strips. 57 2024 Building Code Modification Index (11/3/2025 V.1) Page 132 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index (page 2 of 2024 IRC 34 - Table R905.1.1(2)) 3. A single layer of self-adhering polymer modified bitumen underlayment complying with ASTM D1970, installed in accordance with the underlayment and roof covering manufacturer’s installation instructions for the deck material, roof ventilation configuration and climate exposure of the roof covering. 1. For roof slopes from 2 units vertical in 12 units horizontal (2:12), up to 4 units vertical in 12 units horizontal (4:12), underlayment shall be two layers applied in the following manner: apply a strip of underlayment that is half the width of a full sheet parallel to and starting at the eaves, fastened sufficiently to hold in place. Starting at the eave, apply full-width sheets of underlayment, overlapping successive sheets half the width of a full sheet plus 2 inches. Distortions in the underlayment shall not interfere with the ability of the shingles to seal. End laps shall be 4 inches and shall offset by 6 feet. 2. For roof slopes of 4 units vertical in 12 units horizontal (4:12) or greater underlayment shall be one layer applied in the following manner: underlayment shall be applied shingle fashion, parallel to and starting from the eave and lapped 2 inches. Distortions in the underlayment shall not interfere with the ability of the shingles to seal. End laps shall be 4 inches and shall be offset by 6 feet. 3. A single layer of self-adhering polymer modified bitumen underlayment complying with ASTM D1970, installed in accordance with the underlayment and roof covering manufacturer’s installation instructions for the deck material, roof ventilation configuration and climate exposure of the roof covering. 58 2024 Building Code Modification Index (11/3/2025 V.1) Page 133 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 35 Code Section: R905.2.8.5 Drip Edge Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 40 R905.2.8.5 IRC 2018 IRC 2018 27 R905.2.8.5 IRC 2015 IRC 2015 22 R905.2.8.5 Reason: Impractical—this process is very time intensive and is difficult to produce and enforce any conformity. It is counterproductive and is trying to solve a non -issue. Jurisdictions have had to insert a stand-alone inspection for this one phase of construction in many cases. Modification: R905.2.8.5 Drip edge. A drip edge shall be provided at eaves and rake edges of shingle roofs. Adjacent segments of drip edge shall be overlapped not less than 2 inches (51 mm). Drip edges shall extend not less than 1/4 inch (6.4 mm) below the roof sheathing and extend up back onto the roof deck not less than 2 inches (51 mm). Drip edges shall be mechanically fastened to the roof deck at not more than 12 inches (305 mm) o.c. with fasteners as specified in Section R905.2.5. Underlayment shall be installed over the drip edge along eaves and under the drip edge along rake edges. A drip edge shall be provided at eaves and rake edges of asphalt shingle roofs where required by the manufacturer. 59 2024 Building Code Modification Index (11/3/2025 V.1) Page 134 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 36 Code Section: Chapter 11 [RE] Energy Efficiency Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 41 Chapter 11 IRC 2018 IRC 2018 28 Chapter 11 IRC 2015 IRC 2015 22 Chapter 11 IRC 2012 IRC 2012 16 Chapter 11 IRC 2006 IRC 2006 27 Chapter 11 IRC 2003 IRC 2003 21 Chapter 11 Reason: The State of South Carolina has specific energy standards in statutory form (Re: Title 6, Chapter 9, Building Codes and Title 6, Chapter 10, Building Energy Efficiency Standard Act.). To eliminate any possible conflicts concerning the insulation requiremen ts for single and two family residential buildings between the International Residential Code and state law, Chapter 11 was deleted. Modification: (Chapter deleted without substitution). CHAPTER 11 [RE] ENERGY EFFICIENCY The State of South Carolina has specific energy standards in statutory form (Re: Title 6, Chapter 9, Building Codes and Title 6, Chapter 10, Building Energy Efficiency Standard Act). To eliminate any possible conflicts concerning the insulation requirements for single and two family residential buildings between the International Residential Code and state law, Chapter 11 was deleted.* *All references to Chapter 11 in the Referenced Standards chapter and Index must also removed. 60 2024 Building Code Modification Index (11/3/2025 V.1) Page 135 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 37 Code Section: M1411.9.1 Auxiliary and secondary drain systems Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: The language is removed because it creates confusion. It applies to a drain pan without a drain line, yet it still requires a fitting intended for a drain line. Modification: M1411.9.1 Auxiliary and secondary drain systems. In addition to the requireme nts of Section M1411.9, a secondary drain or auxiliary drain pan shall be required for each cooling or evaporator coil where damage to any building components will occur as a result of overflow from the equipment drain pan or stoppage in the condensate drain piping. Such piping shall maintain a minimum horizontal slope in the direction of discharge of not less than 1/8 unit vertical in 12 units horizontal (1-percent slope). Drain piping shall be not less than 3/4- inch (19 mm) nominal pipe size. One of the following methods shall be used: 1. An auxiliary drain pan with a separate drain shall be installed under the coils on which condensation will occur. The auxiliary pan drain shall discharge to a conspicuous point of disposal to alert occupants in the event of a stoppage of the primary drain. The pan shall have a minimum depth of 1.5 inches (38 mm), shall be not less than 3 inches (76 mm) larger than the unit or the coil dimensions in width and length and shall be constructed of corrosion-resistant material. Galvanized sheet steel pans shall have a minimum thickness of not less than 0.0236 -inch (0.6010 mm) (No. 24 Gage). Nonmetallic pans shall have a minimum thickness of not less than 0.0625 inch (1.6 mm). 2. A separate overflow drain line shall be connected to the drain pan installed with the equipment. This overflow drain shall discharge to a conspicuous point of disposal to alert occupants in the event of a stoppage of the primary drain. The overflow drain line shall conn ect to the drain pan at a higher level than the primary drain connection. 3. An auxiliary drain pan without a separate drain line shall be installed under the coils on which condensation will occur. This pan shall be equipped with a water level detection device conforming to UL 508 that will shut off the equipment served prior to overflow of the pan. The pan shall be equipped with a fitting to allow for drainage. The auxiliary drain pan shall be constructed in accordance with Item 1 of this section. 4. A water-level detection device conforming to UL 508 shall be installed that will shut off the equipment served in the event that the primary drain is blocked. The device shall be installed in the primary drain line, the overflow drain line or the equipment -supplied drain pan, located at a point higher than the primary drain line connection and below the overflow rim of such pan. 61 2024 Building Code Modification Index (11/3/2025 V.1) Page 136 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 38 Code Section: M1411.12 Insulation of refrigerant piping Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 42 M1411.6 IRC 2018 IRC 2018 29 M1411.6 IRC 2015 IRC 2015 24 M1411.6 IRC 2012 IRC 2012 18 M1411.6 IRC 2006 IRC 2006 28 M1411.5 IRC 2003 IRC 2003 22 M1411.4 Reason: Section M1411.4 requires insulation of refrigerant lines to R 4. Further research is needed to determine if this insulating product is commercially available. To qualify for R 4 additional insulation may be required, which could limit the spaces in which refrigerant lines could be installed. Modification: M1411.12 Insulation of refrigerant piping. Piping and fittings for refrigerant vapor (suction) lines shall be insulated with insulation having a thermal resistivity of not less than R-3 at least R 2.5 hr. ft 2 F/Btu and having external surface permeance not exceeding 0.05 perm [2.87 ng/(s × m2 × Pa)] when tested in accordance with ASTM E96. 62 2024 Building Code Modification Index (11/3/2025 V.1) Page 137 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 39 Code Section: M1411.15 Locking access port caps Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 43 M1411.9 IRC 2018 IRC 2018 30 M1411.8 IRC 2015 IRC 2015 25 M1411.6 IRC 2012 IRC 2012 18 M1411.6 Reason: The section appears to solve a non-issue at an added cost to the consumer. Modification: (Section deleted without substitution) M1411.15 Locking access port caps. Refrigerant circuit access ports located outdoors shall be fitted with locking-type tamper-resistant caps or shall be otherwise secured to prevent unauthorized access. 63 2024 Building Code Modification Index (11/3/2025 V.1) Page 138 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 40 Code Section: M1502.3 Duct termination Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 44 M1502.3 IRC 2018 IRC 2018 31 M1502.3 IRC 2015 IRC 2015 26 M1502.3 IRC 2012 IRC 2012 19 M1502.3 IRC 2006 IRC 2006 29 M1502.2 Reason: The three feet dimension is arbitrary and restrictive; the dimension is not a requirement of the dryer manufacturers. Modification: M1502.3 Duct termination. Exhaust ducts shall terminate on the outside of the building. Exhaust duct terminations shall be in accordance with the dryer manufacturer's installation instructions. If the manufacturer's instructions do not specify a termination location, the exhaust du ct shall terminate not less than 3 feet (914 mm) in any direction from openings into buildings, including openings in ventilated soffits. Exhaust duct terminations shall be equipped with a backdraft damper. Screens shall not be installed at the duct termination. 64 2024 Building Code Modification Index (11/3/2025 V.1) Page 139 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 41 Code Section: M1502.4.2 Duct Installation Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 45 M1502.4.2 IRC 2018 IRC 2018 32 M1502.4.2 Reason: Due to the amount of dryer fires in the US every year, 15,000 according to the US Consumer Product Safety Division, the requirement for adding three screws per joint to the exhaust vent of clothes dryers is overly restrictive, impractical, and a threat to life safety. The amount of dryer fires in the US has not been proven to be due to failure of the joints on vents, but has been proven to be due to an accumulation of lint. Adding protrusions to any length into the dryer exhaust will not decrease the probability of more accumulation. However, securing, scaling and supporting each side of the joint of a no-vertical-exhaust will prevent the separation of joints. Modification: M1502.4.2 Duct installation. Exhaust ducts shall be supported at intervals not to exceed 8 feet (2438 mm) and within 16 inches (406 mm) of each side of a joint that is not installed in a vertical orientation, 12 feet (3658 mm) and shall be secured in place, making rigid contact with the duct at not less than 4 equally spaced points or two-thirds contact if strap is used. All brackets or strapping must be noncombustible. The insert end of the duct shall extend into the adjoining duct or fitting in the direction of airflow. The overlap shall comply with Section M1601.4.2. Ducts shall not be joined with screws or similar devices that protrude into the inside of the duct . Exhaust ducts joints shall be sealed in accordance with Section M1601.4.1. and shall be mechanically fastened. Ducts shall not be joined with screws or similar fasteners that protrude more than 1/8 inch (3.2 mm) into the inside of the duct . Where dryer exhaust ducts are enclosed in wall or ceiling cavities, such cavities shall allow the installation of the duct withou t deformation. The duct work may be ovalized as long as it terminates in an approved duct box. Minor imperfections located on the duct, in areas other than along the seam, do not constitute a violation. 65 2024 Building Code Modification Index (11/3/2025 V.1) Page 140 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 42 Code Section: M1502.4.6 Duct length Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 46 M1502.4.6 IRC 2018 IRC 2018 33 M1502.4.5 IRC 2015 IRC 2015 27 M1502.4.4 IRC 2012 IRC 2012 20 M1502.4.4 IRC 2006 IRC 2006 30 M1502.6 Reason: To coincide with the maximum duct length specified by most clothes dryer manufacturers. Modification: M1502.4.6 Duct length. The maximum allowable exhaust duct length shall be determined by one of the methods specified in Sections M1502.4.6.1 through M1502.4.6.3. The maximum length of a clothes dryer exhaust duct shall not exceed 35 feet (10668 mm) from the dryer location to the wall or roof termination. 66 2024 Building Code Modification Index (11/3/2025 V.1) Page 141 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 43 Code Section: M1503.6 Makeup air Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 47 M1503.6 IRC 2018 IRC 2018 34 M1503.6 IRC 2015 IRC 2015 28 M1503.4 Reason: Makeup air is not required for installations less than 400 cfm. Modification: M1503.6 Makeup air required. Where one or more gas, liquid or solid fuel -burning appliance that is neither direct -vent nor uses a mechanical draft venting system is located within a dwelling unit's air barrier, each exhaust system capable of exhausting in excess of 400 cubic feet per minute (0.19 m 3/s) shall be mechanically or passively provided with makeup air at a rate approximately equal to the exhaust air rate. Such makeup air systems shall be equipped with not fewer than one outdoor air duct and damper complying with Section M1503.6.2. Exception: Makeup air is not required for exhaust systems installed for the exclusive purpose of space cooling and intended to be operated only when windows or other air inlets are open. Exhaust hood systems capable of exhausting more than 400 cubic feet per minute (0.1 9 m 3 /s) shall be mechanically or naturally provided with makeup air at a rate approximately equal to the exhaust air rate more than 400 cubic feet (0.19 m3/s) per minute. Such makeup air systems shall be equipped with not less than one outdoor air duct and damper. Each damper shall be a gravity damper or an electrically operated damper that automatically opens when the exhaust system operates. Dampers shall be accessible for inspection, service, repair and replacement without removing permanent construction or any other ducts not connected to the damper being inspected, serviced, repaired or replaced. 67 2024 Building Code Modification Index (11/3/2025 V.1) Page 142 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 44 Code Section: M1504.3 Exhaust Openings Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 48 M1504.3 IRC 2018 IRC 2018 35 M1504.3 Reason: Locating air exhaust openings (typically from bath exhaust fans) 3 or more feet (914 mm) away from an operable window or door is impractical in the design of residential structures. This also brings the exhaust air opening requirement in line with dryer vent duct termination in M1502.3. Modification: M1504.3 Exhaust openings. Air exhaust openings shall terminate as follows: 1. Not less than 3 feet (914 mm) from property lines. 2. Not less than 3 feet (914 mm) from gravity air intake openings, operable windows and doors except where the exhaust opening is located not less than 1 foot (305 mm) above the gravity air intake opening, operable windows and doors. 3. Not less than 10 feet (3048 mm) from mechanical air intake openings except where either of the following apply: 3.1 The exhaust opening is located not less than 3 feet (914 mm) above the air intake opening. 3.2 The exhaust opening is part of a factory-built intake/exhaust combination termination fitting installed in accordance with the fan manufacturer's instructions, and the exhaust air is drawn from a living space. 4. In accordance with Section R303.5.2 and R303.6. Exception: Bathrooms, water closets and shower spaces. 68 2024 Building Code Modification Index (11/3/2025 V.1) Page 143 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 45 Code Section: M1601.4.1 Joints, Seams and Connections Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 49 M1601.4.1 IRC 2018 IRC 2018 36 M1601.4.1 IRC 2015 IRC 2015 29 M1601.4.1 Reason: The requirement to seal longitudinal duct joints and seams for commercial applications with static pressure of 2 inches water column and greater. However, this should not apply to residential applicants which operate at a much lower pressure, closer to 0.2 inches water column. One argument to seal all seams and joints is so the duct system functions efficiently. However, whether the longitudinal joints and seams are sealed or not on a low -pressure system has very little effect on system efficiency. To a muc h greater degree, system efficiency is affected by factors outside of the installer’s influence. For example, the duct system can be perfectly balanced at the time of the inspection, but the occupants set furniture in front of registers, change the settings on the registers open and close doors, etc. Sealing the longitudinal joints and seams will not make a noticeable difference in either the efficiency or the energy saved, making the added time and cost unnecessary. Modification: M1601.4.1 Joints, seams and connections. Longitudinal and transverse joints, seams and connections in metallic and nonmetallic ducts shall be constructed as specified in SMACNA HVAC Duct Construction Standards --Metal and Flexible and NAIMA Fibrous Glass D uct Construction Standards . Joints, longitudinal and transverse seams, and connections in ductwork shall be securely fastened and sealed with welds, gaskets, mastics (adhesives), mastic-plus-embedded-fabric systems, liquid sealants or tapes. Tapes and mastics used to seal fibrous glass ductwork shall be listed and labeled in accordance with UL 181A and shall be marked “181A -P” for pressure-sensitive tape, “181 A-M” for mastic or “181 A -H” for heat-sensitive tape. Tapes and mastics used to seal metallic and flexible air ducts and flexible air connectors shall comply with UL 181B and shall be marked “181 B -FX” for pressure-sensitive tape or “181 BM” for mastic. Duct connections to flanges of air distribution system equipment shall be sealed and mechanically fastened. Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181B and shall be marked 181B-C. Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet -metal screws or rivets equally spaced around the joint. 69 2024 Building Code Modification Index (11/3/2025 V.1) Page 144 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index (page 2 of IRC 2024 45 - M1601.4.1) Closure systems used to seal all ductwork shall be installed in accordance with the manufacturers' instructions. Exceptions: 1. Spray polyurethane foam shall be permitted to be applied without additional joint seals. 2. Where a duct connection is made that is partially without access, three screws or rivets shall be equally spaced on the exposed portion of the joint so as to prevent a hinge effect. 3. For ducts having a static pressure classification of less than 2 inches of water column (500 Pa), additional closure systems shall not be required for continuously welded joints and seams and locking-type joints and seams. This exception shall not apply to snap-lock and button-lock type joints and seams that are located outside of conditioned spaces. 70 2024 Building Code Modification Index (11/3/2025 V.1) Page 145 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 46 Code Section: G2415.17.1 (404.17.1) Limitations Proponent: Omega Flex, Inc. Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: Composite tubing (both pex-al-pex and pe-al-pe) is being sold in the United States for use in fuel gas systems. The pex -al-pex material was evaluated by the NFPA 54 National Fuel Gas code committee which did not approve it for fuel gas applications because the product lacks equivalency to proscribed piping systems. It is, nonetheless, being presented to AHJs who are being asked to approve it for use as an alternative material for use within buildings in the United States. Even though the evaluation services report lists this section of the code limiting the material to outdoors below ground, several AHJs have approved it for installation above grade within the building where it poses a potential hazard in the event of a building fire. A characteristic it shares with plastic gas piping and the reason for this section. Modification: G2415.17.1 (404.17.1) Limitations. Plastic pipe and plastic composite piping including pex-al-pex and pe- al-pe (where listed and approved) shall be installed outdoors underground only. Plastic pipe shall not be used within or under any building or slab or be operated at pressures greater than 100 psig (689 kPa) for natural gas or 30 psig (207 kPa) for LP-gas. Exceptions: 1. Plastic pipe shall be permitted to terminate above ground outside of buildings where installed in premanufactured anodeless risers or service head adapter risers that are installed in accordance with the manufacturer’s instructions. 2. Plastic pipe shall be p ermitted to terminate with a wall head adapter within buildings where the plastic pipe is inserted in a piping material for fuel gas use in buildings. 3. Plastic pipe shall be permitted under outdoor patio, walkway and driveway slabs provided that the burial depth complies with Section G2415.12. 71 2024 Building Code Modification Index (11/3/2025 V.1) Page 146 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 47 Code Section: G2418.2 Design and installation Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 50 G2418.2 IRC 2018 IRC 2018 37 G2418.2 IRC 2015 IRC 2015 30 G2418.2 IRC 2012 IRC 2012 21 G2418.2 Reason: To allow other support materials that have been used successfully for years. Modification: G2418.2 (407.2) Design and installation. Piping shall be supported with metal pipe hooks, metal pipe straps, metal bands, metal brackets, metal hangers or building structural components suitable for the size of piping, of adequate strength and quality, and located at intervals so as to prevent or damp out excessive vibration. Piping shall be anchored to prevent undue strains on connected appliances and shall not be supported by other piping. Pipe hangers and supports s hall conform to the requirements of MSS SP-58 and shall be spaced in accordance with Section G2424. Supports, hangers and anchors shall be installed so as not to interfere with the free expansion and contraction of the piping between anchors. The components of the supporting equipment shall be designed and installed so that they will not be disengaged by movement of the supported piping. 72 2024 Building Code Modification Index (11/3/2025 V.1) Page 147 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 48 Code Section: P2503.6 Shower liner test Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 51 P2503.6 IRC 2018 IRC 2018 38 P2503.6 IRC 2015 IRC 2015 31 P2503.6 IRC 2012 IRC 2012 22 P2503.6 Reason: To allow a simple test performed under typical conditions Modification: P2503.6 Shower liner test. Where shower floors and receptors are made watertight by the application of materials required by Section P2709.2, the completed liner installation shall be tested. The pipe from the shower drain shall be plugged watertight for the test. The floor and receptor area shall be filled with potable water to a depth of not less than 2 inches (51 mm) measured at the threshold. Where a threshold of not less than 2 inches (51 mm) in height does not exist, a temporary threshold shall be constructed to retain the test water in the lined floor or receptor area to a level not less than 2 inches (51 mm) in depth measured at the threshold. The water shall be retaine d The shower liner shall be tested to the lesser of the depth of threshold or 2 inches (51 mm) and shall be operated at normal pressure for a test period of not less than 15 minutes and there shall not be evidence of leakage. 73 2024 Building Code Modification Index (11/3/2025 V.1) Page 148 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 49 Code Section: P2503.6 Shower liner test Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: Allows scheduling flexibility and avoids delays by letting builders choose the test stage, without reducing safety or performance. Ensures compliance without disrupting construction flow. Modification: (Adds to modified language from IRC 2024 48) P2503.6 Shower liner test. Where shower floors and receptors are made watertight by the application of materials required by Section P2709.2, the completed liner installation shall be tested. The shower liner shall be tested to the lesser of the depth of threshold or 2 inches (51 mm) and shall be operated at normal pressure for a test period of not less than 15 minutes and there shall not be evidence of leakage. The shower liner test shall be performed at the rough plumbing or at the final plumbing inspection at the discretion of the builder. 74 2024 Building Code Modification Index (11/3/2025 V.1) Page 149 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 50 Code Section: P2603.2.1 Protection against physical damage Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 53 P2603.2.1 Reason: Clarification Modification: P2603.2.1 Protection against physical damage. In concealed locations, where piping, other than cast-iron or galvanized steel, is installed through holes or notches in studs, joists, rafters or similar members less than 1 1/4 inches (31.8 mm) from the nearest edge of the member, the pipe shall be protected by steel shield plates. Such plates shall cover the area of the pipe where the member is notched or bored, and shall extend not less than 2 inches (51 mm) above sole plates and below top plates. Steel shield plates shall not be secured with nails or screws, unless required by the manufacturer. P2603.2.1.1. Shield Plates. Shield plates shall be of steel material having a thickness of not less than 0.0575 inch (1.463 mm) (No. 16 gage). 75 2024 Building Code Modification Index (11/3/2025 V.1) Page 150 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 51 Code Section: P2603.5 Freezing Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 54 P2603.5 IRC 2018 IRC 2018 39 P2603.5 IRC 2015 IRC 2015 32 P2603.5 Reason: Unusually restrictive Modification: P2603.5 Freezing. In localities having a winter design temperature of 32°F (0°C) or lower as shown in Table R301.2 of this code, a water, soil or waste pipe shall not be installed outside of a building, in exterior walls, in attics or crawl spaces, or in any other place subjected to freezing temperature unless adequate provision is made to protect it from freezing by insulation or heat or both. Water service pipe shall be installed not less than 12 inches (305 mm) deep and not less than 6 inches (152 mm) below the frost line. 76 2024 Building Code Modification Index (11/3/2025 V.1) Page 151 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 52 Code Section: P2603.5 Freezing Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 55 P2603.5 Reason: Unusually restrictive Modification: (Adds to modified language from IRC 2024 51) P2603.5 Freezing. In localities having a winter design temperature of 32°F (0°C) or lower as shown in Table R301.2 of this code, a water pipe shall not be installed outside of a building, in exterior walls, in attics or crawl spaces, or in any other place subjected to freezing temperature unless adequate provision is made to protect it from freezing by insulation or heat or both. Water service pipe shall be installed not less than 12 inches (305 mm) deep and not less than 6 inches (152 mm) below the frost line. Exception: Water pipes that are installed on the warm in winter side of the building envelope, i.e., above the insulation line in a floor system or below the insulation line in an attic, do not need additional pipe insulation. 77 2024 Building Code Modification Index (11/3/2025 V.1) Page 152 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 53 Code Section: P2705.1 General Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 56 P2705.1 Reason: It has been decided that sealing a toilet/bidet to the floor would prevent witness to possible seal leaks that may go undetected. Modification: P2705.1 General. The installation of fixtures shall conform to the following: 1. Floor-outlet or floor-mounted fixtures shall be secured to the drainage connection and to the floor, where so designed, by screws, bolts, washers, nuts and similar fasteners of copper, copper alloy or other corrosion-resistant material. 2. Wall-hung fixtures shall be rigidly supported so that strain is not transmitted to the plumbing system. 3. Where fixtures come in contact with walls and floors, the contact area shall be watertight. Exception: Water closets and/or bidets shall not be required to be caulked to flooring surface. 4. Plumbing fixtures shall be usable. 5. Water closets, lavatories and bidets. A water closet, lavatory or bidet shall not be set closer than 15 inches (381 mm) from its center to any side wall, partition or vanity or closer than 30 inches (762 mm) 27 inches center-to-center between adjacent fixtures. There shall be a clearance of not less than 21 inches (533 mm) in front of a water closet, lavatory or bidet to any wall, fixture or door. 6. The location of piping, fixtures or equipment s hall not interfere with the operation of windows or doors. 7. In flood hazard areas as established by Table R301.2, plumbing fixtures shall be located or installed in accordance with Section R306.1.6. 8. Integral fixture -fitting mounting surfaces on manufactured plumbing fixtures or plumbing fixtures constructed on site, shall meet the design requirements of ASME A112.19.2/CSA B45.1 or ASME A112.19.3/CSA B45.4. 78 2024 Building Code Modification Index (11/3/2025 V.1) Page 153 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 54 Code Section: P2705.1 General Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: The added exception allows greater design flexibility in tight spaces by permitting toilets and bidets to be placed 12" from a shower or tub edge —areas where obstruction and access issues are minimal. This helps optimize bathroom layouts in smaller homes without compromising functionality or safety. Removing the lavatory from the spacing requirement in this context avoids unnecessary restrictions. Lavatories are often placed adjacent to tubs or showers without access or usability issues, and the standard clearance in front still ensures user comfort and code compliance. Modification: (Adds to modified language from IRC 2024 53) P2705.1 General. The installation of fixtures shall conform to the following: 1. Floor-outlet or floor-mounted fixtures shall be secured to the drainage connection and to the floor, where so designed, by screws, bolts, washers, nuts and similar fasteners of copper, copper alloy or other corrosion-resistant material. 2. Wall-hung fixtures shall be rigidly supported so that strain is not transmitted to the plumbing system. 3. Where fixtures come in contact with walls and floors, the contact area shall be watertight. Exception: Water closets and/or bidets shall not be required to be caulked to flooring surface. 4. Plumbing fixtures shall be usable. 5. Water closets, lavatories and bidets. A water closet, lavatory or bidet shall not be set closer than 15 inches (381 mm) from its center to any side wall, partition or vanity or closer than 27 inches center-to-center between adjacent fixtures. There shall be a clear ance of not less than 21 inches (533 mm) in front of a water closet, lavatory or bidet to any wall, fixture or door. Exception: toilets and bidets may have spaced 12” from its center to the edge of a shower or tub. 6. The location of piping, fixtures or equipment shall not interfere with the operation of windows or doors. 7. In flood hazard areas as established by Table R301.2, plumbing fixtures shall be located or installed in accordance with Section R306.1.6. 8. Integral fixture -fitting mounting surfaces on manufactured plumbing fixtures or plumbing fixtures constructed on site , shall meet the design requirements of ASME A112.19.2/CSA B45.1 or ASME A112.19.3/CSA B45.4. 79 2024 Building Code Modification Index (11/3/2025 V.1) Page 154 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 55 Code Section: P2708.4 Shower control valves Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 57 P2708.4 Reason: Unenforceable and ambiguous Modification: P2708.4 Shower control valves. Individual shower and tub/shower combination valves shall be balanced- pressure, thermostatic or combination balanced -pressure/thermostatic valves that conform to the requirements of ASSE 1016/ASME 112.1016/CSA B125.16 or ASME A112.18.1/CSA B125.1 . Shower control valves shall be rated for the flow rate of the installed shower head. Such valves shall be installed at the point of use. Shower and tub/shower combination valves required by this section shall be equipped with a means to limit the maximum setting of the valve to 120°F (49°C), which shall be field adjusted in accordance with the manufacturer's instructions to provide water at a temperature not to exceed 120ºF (49°C). In-line thermostatic valves shall not be utilized for compliance with this section. 80 2024 Building Code Modification Index (11/3/2025 V.1) Page 155 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 56 Code Section: P2713.3 Bathtub and whirlpool bathtub valves Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 58 P2713.3 Reason: New language is unenforceable and ambiguous. Reverts language back to 2018 IRC. Modification: P2713.3 Bathtub and whirlpool bathtub valves. Bathtubs and whirlpool bathtub valves shall have or be supplied by a water -temperature-limiting device that conforms to ASSE 1070/ASME A112.1070/CSA B125.70, except where such valve s are combination tub/shower valves in accordance with Section P2708.4. The water-temperature-limiting device required by this section shall be equipped with a means to limit the maximum setting of the device to 120ºF (49ºC), and, where adjustable, shall be field adjusted in accordance with the manufacturer's instructions to prov ide hot water at a temperature not to exceed 120ºF (49ºC). Access shall be provided to water -temperature-limiting devices that conform to ASSE 1070/ASME A112.1070/CSA B125.70. Exception: Access is not required for nonadjustable water -temperature-limiting d evices that conform to ASSE 1070/ASM E A112.1070/CSA B125.70 and are integral with a fixture fitting, provided that the fixture fitting itself can be accessed for replacement. Hot water supplied to bathtubs and whirlpool bathtubs shall be limited to a tempe rature of not greater than 120ºF (49ºC) by a water -temperature limiting device that conforms to ASSE 1070/ASME A112.1070/CSA B125.70 or CSA B125.3 , except where such protection is otherwise provided by a combination tub/shower valve in accordance with Section P2708.4. 81 2024 Building Code Modification Index (11/3/2025 V.1) Page 156 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 57 Code Section: P2903.10.3 Fixture valves and access Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: Through-wall faucets often have limited access and are typically connected to a common supply with an interior shutoff valve. Requiring individual shutoff valves at each through -wall fixture is impractical and may require invasive wall modifications. Adding this exception aligns with standard installation practices and maintains accessibility without unnecessary disruption or cost. Modification: P2903.10.3 Fixture valves and access. Shutoff valves shall be required on each fixture supply pipe to each plumbing appliance and to each plumbing fixture other than through wall faucets bathtubs and showers. Valves serving individual plumbing fixtures, plumbing appliances, risers and branches shall be accessible. 82 2024 Building Code Modification Index (11/3/2025 V.1) Page 157 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 58 Code Section: P2903.11 Hose bibb Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 60 P2903.10 IRC 2018 IRC 2018 40 P2903.10 IRC 2015 IRC 2015 33 P2903.10 Reason: Unusually restrictive Modification: (Section deleted without substitution) P2903.11 Hose bibb. Hose bibbs subject to freezing, including the “frostproof” type, shall be equipped with an accessible stop -and-waste-type valve inside the building s o that they can be controlled and drained during cold periods. Exception: Frostproof hose bibbs installed such that th e stem extends through the building insulation into an open heated or semiconditioned space need not be separately valved (see Figure P2903.11). (Figure also deleted with section) 83 2024 Building Code Modification Index (11/3/2025 V.1) Page 158 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 59 Code Section: P2904.2.4.2.1 Additional requirements for pendent sprinklers Proponent: South Carolina Master Plumbers Association Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 62 P2904.2.4.2.1 Reason: To reconcile SC IRC P2904.2.4.2.1 to agree with NFPA 13D 8.2.5.1.4 that is considered to be equal to SC IRC P2904. NFPA 13D -2016, 8.2.5.1.4: Where area of the fan blades encompass more than 50% of the area of the plan view, the sprinkler shall be installed in accordance with 8.2.5.3. Cost analysis for this modification: the cost of the residential sprinkler protection in the affected fan areas are reduced by as much as 50% with no reduction in the effectiveness of the fire sprinkler performance. Modification: P2904.2.4.2.1 Additional requirements for pendent sprinklers. Pendent sprinklers within 3 feet (915 mm) of the center of a ceiling fan, surface mounted ceiling luminaire or similar object shall be considered to be obstructed, and additional sprinklers shall be installed. Exception: Pendent sprinklers within 3 feet (915 mm) of the center of a ceiling fan shall not be considered to be obstructed if the total area of the fan blades do es not exceed more than 50 percent of the plan area view. 84 2024 Building Code Modification Index (11/3/2025 V.1) Page 159 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 60 Code Section: E3601.7.3 Metering centers Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: Remove the word separate when referencing meter centers with two to six disconnecting means. Requiring separate compartments for disconnecting means when these means of disconnect are grouped together limits types of metering allowed in residential dwellings supplied by 400amp services as well as types of meter centers allowed to be installed on residential single family town home construction. In these situations, requiring separate compartments significantly increases cost of new home construction. Modification: E3601.7.3 Metering centers. A service with two to six disconnecting means in separate compartments of a metering center or a metering center with a main service disconnecting means shall be permitted. [230.71 (B), 230.72 (A)] Exception: Disconnecting means installed as part of listed equipment and used solely for the following shall not be considered a service disconnecting means: 1. Power monitoring equipment. 2. Surge-protective device(s). 3. Power-operable service disconnecting means. [230.71 (A)] 85 2024 Building Code Modification Index (11/3/2025 V.1) Page 160 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 61 Code Section: E3606.5 Surge protection Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 66 E3606.5 Reason: Delete the entire section as the requirement does not cover low voltage systems, and cannot provide complete coverage from surges outside of the incoming service line. This language would also foster an unreasonable and unenforceable implied warranty. The additional costs do not justify any potential benefits. Modification: (Section is deleted without substitution) E3606.5 Surge protection. All services supplying one- and two-family dwelling units shall be provided with a surge protective device (SPD) installed in accordance with Sections E3606.5.1 through E3606.5.3. E3606.5.1 Location. The SPD shall be an integral part of the service equipment or shall be located immediately adjacent thereto. Exception: The SPD shall not be required to be located in the service equipment if located at each next-level distribution equipment downstream toward the load. E3606.5.2 Type. The SPD shall be a Type 1 or Type 2 SPD. E3606.5.3 Replacement. Where service equipment is replaced, all of the requirements of this section shall apply. [230.67] E3606.5.4 Ratings. SPDs shall have a nominal discharge current rating (ln) of not less than 10 kA. [230.67] 86 2024 Building Code Modification Index (11/3/2025 V.1) Page 161 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 62 Code Section(s): E3702.2 Branch-circuit ampere rating E3702.3 Ten-ampere branch circuits Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: 10amp branch circuits for limited branch circuit loads will lead to post inspection code violations. Homeowners who are not aware that they have a 10amp branch circuit supplying power to a lighting load may add outlets to that branch circuit and therefore violate code. While adding the ability to use 10amp over current protection on branch circuits for a limited basis, minimum size AWG circuit conductors from Table E3702.15 (1) and E3702.15( 2) is equal to 15 amp over current protection, therefore leading to additional opportunists for confusion and code violation. Modification: E3702.2 Branch-circuit ampere rating. Branch circuits shall be rated in accordance with the maximum allowable ampere rating or setting of the overcurrent protection device. The rating for other than individual branch circuits shall be 10, 15, 20, 30, 40 and 50 amperes. Where conductors of higher ampacity are used, the ampere rating or setting of the spec ified over-current device shall determine the circuit rating. (210.18) E3702.3 Ten-ampere branch circuits. A 10-ampere branch circuit shall comply with the following: 1. A 10-ampere branch circuit shall be permitted to supply one or more of the following: lighting outlets, dwelling unit exhaust fans on bathroom or laundry room lighting circuits, and a gas fireplace unit supplied by an individual branch circuit. 2. A 10 -ampere branch circuit shall not supply receptacle outlets, fixed appliances except as permitted for individual branch circuits, garage door openers and laundry equipment. [210.23(A)(1) and (2)] 87 2024 Building Code Modification Index (11/3/2025 V.1) Page 162 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 63 Code Section: E3802.4 In unfinished basements Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 67 E3802.4 IRC 2018 IRC 2018 42 E3802.4 IRC 2015 IRC 2015 35 E3802.4 Reason: Unusually restrictive Modification: E3802.4 In unfinished basements and crawl spaces. Where Type NM or SE cable is run at angles with joists in unfinished basements and crawl spaces, cable assemblies containing two or more conductors of sizes 6 AWG and larger and assemblies containing three or more conductors of sizes 8 AWG and larger shall not require additional protection where attached directly to the bottom of the joists. Smaller cables shall be run either through bored holes in joists or on running boards. Type NM or SE cable installed on the wall of an unfinished basement shall be permitted to be installed in a listed conduit or tubing or shall be protected in accordance with Table E3802.1. Conduit or tubing shall be provided with a bushing or adapter that provides protection from abrasion at the point where the cable enters and exits the raceway. The sheath of the Type NM or SE cable shall ex tend through the conduit or tubing and into the outlet, device or junction box not less than 1/4 inch (6.4 mm). The cable shall be secured within 12 inches (305 mm) of the point where the cable enters the conduit or tubing. Metal conduit, tubing, and metal outlet boxes shall be connected to an equipment grounding conductor complying with Section E3908.14. [334.15(C)] 88 2024 Building Code Modification Index (11/3/2025 V.1) Page 163 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 64 Code Section(s): E3901.4.2 Island and peninsular countertops and work surfaces E3901.4.3 Receptacle outlet location Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: The original requirement mandating provisions for a future receptacle outlet —when one is not otherwise required—is unnecessary and impractical. By adopting the updated NEC -based language that clearly defines when and where receptacle outlets must be installed on islands and peninsulas, we ensure adequate access to power based on actual layout and usage, rather than speculative future needs. This approach provides code clarity, improves design flexibility, and removes an ambiguous and unenforceable obligation, while still maintaining electrical safety and functionality. Modification: E3901.4.2 Island and peninsular countertops and work surfaces . Receptacle outlets, if installed to serve an island or peninsular countertop or work surface, shall be installed in accordance with Section E3901.4.3. If a receptacle outlet is not provided to serve an island or peninsular countertop or work surface, provisions shall be provided at the island or peninsula for future addition of a receptacle outlet to serve the island or peninsular countertop or work surface. E3901.4.2 Island and peninsular countertops and work spaces. Receptacle outlets shall be installed in accordance with the following: [210.52(C)(2)] 1. At least one receptacle outlet shall be provided for the first 6 feet (1829 mm) of length, or fraction thereof, of the countertop or work surface. A minimum of two receptacle outlets shall be provided for any island over 6 feet (1829 mm) long. 2. At least on e receptacle outlet shall be located within 2 feet (600 mm) of the outer end of a peninsular countertop or work surface. Additional receptacle outlets shall be permitted to be located as determined by the installer, designer or building owner. The location of the receptacle outlets shall be in accordance with Section E3901.4.3. [210.52(C)(2)(b)] 89 2024 Building Code Modification Index (11/3/2025 V.1) Page 164 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index (page 2 of IRC 2024 64 - E3901.4.2 & E3901.4.3) E3901.4.3 Receptacle outlet location. Receptacle outlets rendered not readily accessible by appliances fastened in place, appliance garages, sinks, or rangetops as covered in the exception to Section E3901.4.1, or appliances occupying assigned spaces shall not be considered as these required outlets. Required receptacle outlets shall be located in one or more of the following: 1. On or above, but not more than 20 inches (508 mm) above, the countertop or work surface. 2. In a countertop using receptacle outlet assemblies listed for the use in countertops. 3. In a work surface using receptacle outlet assemblies listed for use in work surfaces or listed for use in countertops. [210.52(C)(3)] E3901.4.3 Receptacle outlet location. Receptacle outlets rendered not readily accessible by appliances fastened in place, appliance garages, sinks, or rangetops as covered in the exception to Section E3901.4.1, or appliances occupying assigned spaces shall not be considered as these required outlets. Required receptacle outlets shall be located in one or more of the following: 1. On or above, but not more than 20 inches (508 mm) above, the countertop or work surface. 2. Receptacle outlet assemblies listed for the use in countertops or work surfaces shall be permitted to be installed in countertops or work surfaces. 3. Not more than 12 inches (305 mm) below t he countertop or work surface. Receptacles installed below a countertop or work surface shall not be located where the countertop or work surface extends more than 6 inches (152 mm) beyond its support base. [210.52(C)(3)] 90 2024 Building Code Modification Index (11/3/2025 V.1) Page 165 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 65 Code Section: E3902 Ground-fault and Arc-fault Circuit Interrupted Protection Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 70 E3902 Reason: The amendment removes the requirements for AFCI devices for residential dwelling units, including one- and two-family homes. Reasoning includes cost savings, citing that families who cannot qualify to purchase homes due to the increased costs from mandatory code requirements, such as AFCIs, will have to live in housing that is less safe, because that hous ing was built to less stringent code requirements. The total cost to homebuyers to install AFCIs is over $430,000,000 per year —24 times the cost of damage per year, and it is clear that requiring AFCIs in new construction will not prevent all damage. This is due to the fact that AFCIs cannot prevent all fires and, more importantly, that electrical fires occur overwhelmingly in older houses. From 1980 to 2015, there has been a significant drop in the number of reported fires, injuries and fatalities in the U S. Both the number of fires and fatalities have dropped by approximately 50%, even as the population increased. The decline was sharpest during the 1980s, before AFCIs were introduced. This further supports the importance of encouraging homeowners to move up to newer homes without the added burden of increased regulation. Modification: Entire section E3902.1 - E3902.22 modified to remove “through 250 volt” from text. SECTION E3902 GROUND-FAULT AND ARC-FAULT CIRCUIT-INTERRUPTER PROTECTION 91 2024 Building Code Modification Index (11/3/2025 V.1) Page 166 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 66 Code Section: E3902.5 Basement receptacles Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 71 E3902.5 Reason: A finished basement is not noted as a wet areas and their addition is not needed or required. Modification: (Adds to modified language from IRC 2024 65) E3902.5 Basement receptacles. 125-volt receptacles installed in basements and supplied by single - phase branch circuits rated 150 volts or less to ground shall have ground -fault circuit -interrupter protection for personnel. [210.8(A)(5)] Exceptions: 1. Receptacles in walk-out basements are excluded from this requirement. 92 2024 Building Code Modification Index (11/3/2025 V.1) Page 167 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 67 Code Section: E3902.12 Specific appliance outlets Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: Removing additional ground fault protection for specific outlets as this requirement is redundant for most of these specific branch circuits, while also creating opportunity for nuisance tripping on additional branch circuits not previously covered. Removing the requirements for GFI protection from the above code section, aligns GFI protection with modifications from 2021 South Carolina IRC. Modification: E3902.12 Specific appliance outlets Ground-fault circuit-interrupter protection shall be provided for the branch circuit or outlets supplying the following appliances rated 150 volts or less to ground and 60 amperes or less, single- or three-phase: 1. Drinking water coolers and bottle fill stations. 2. High-pressure spray washing machines. 3. Sump pumps. 4. Dishwashers. 5. Electric ranges. 6. Wall-mounted ovens. 7. Counter-mounted cooking units. 8. Clothes dryers. 9. Microwave ovens. [210.8(D)] 93 2024 Building Code Modification Index (11/3/2025 V.1) Page 168 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 68 Code Section: E.3902.14 Outdoor Outlets Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section NEC 2020* NEC 2020 04 210.8(F) *This was previously tied to a 2020 NEC modification that was amended with the 2024 code adoption process to also include the IRC. Reason: It has not been determined if all A/C condenser units will operate on a GFCI -protected circuit as sufficient testing has not been conducted. In addition, branch circuit extensions or modifications would require the addition of GFCI protection for old condens er units, and it is not known whether the existing equipment is compatible with GFCI. Modification: E3902.14 Outdoor outlets. All outdoor outlets, including outlets installed in the following locations, and supplied by single -phase branch circuits rated 150 volts or less to ground, 50 amperes or less, shall be provided with GFCI protection: 1. Garages that have floors located at or below grade level. 2. Accessory buildings. 3. Boathouses. Exceptions: 1. GFCI protection shall not be required on lighting outlets other than those covered in Section 210.8(F) of NFPA 70. 2. GFCI protection shall not be required for receptacles that are not readily accessible and are supplied by a branch circuit dedicated to electric snow -melting, deicing, or pipeline an d vessel heating equipment where such equipment is protected as required by NFPA 70. 3. GFCI protection shall not be required for listed HVAC equipment. This exception shall expire September 1, 2026. [210.8(F)] 94 2024 Building Code Modification Index (11/3/2025 V.1) Page 169 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 69 Code Section: E3902.21 Arc-fault circuit interrupter protection. Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 71 E3902.17 IRC 2018 IRC 2018 44 E3902.16 Reason: No accurate SC-specific data substantiates a need for AFCI. Data collected over a 12 -year period (2002-2023) shows that there was an estimated average of 0.6 civilian deaths per year in fires caused by electrical arcing in one- and two-family homes, and an estimated total of five civilian injuries. An average of 19 fires were caused annually by electrical arcing, and the average annual total damage from fires caused by electrical arcing in both prope rty and contents adjust to 2013 dollars was $438,349. The costs association with AFCI don’t even take into account the added expense of nuisance trips. Due to these and other findings, 29 states have either removed or made amendments to AFCI and GFCI provi sions. Mandating costly incremental increases in safety will not only protect those who can afford them, and will often decrease safety for those who cannot. Modification: E3902.21 Arc-fault circuit interrupter protection. In areas other than kitchen and laundry areas, Bbranch circuits that supply 120 -volt, single-phase, 10-, 15- and 20- ampere outlets installed in kitchens, family rooms, dining rooms, living rooms, parlors, librarie s, dens, bedrooms, sunrooms, recreations rooms, closets, hallways, laundry areas and similar rooms or areas shall be protected by any of the following: [210.12(A)] (language in items 1 - 6 unchanged by modification) 95 2024 Building Code Modification Index (11/3/2025 V.1) Page 170 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 70 Code Section: E4002.11 Bathtub and shower space Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: Replacing the 3' dimension measured horizontally from the edge of the bathtub or shower to 27" measured horizontally matches the plumbing modification for plumbing code P2705.1 General. This modification aligns electrical and plumbing requirements for the dimensions between adjacent fixtures. Modification: E4002.11 Bathtub and shower space. Receptacles shall not be installed inside of the tub or shower within a zone measured 3 feet (914 mm) 27 inches horizontally from the outside edge of the bathtub or shower stall, including the space outside the bathtub or shower stall space below the zone. The zone also includes the space measured vertically from the floor to 8 feet (2438 mm) above the top of the bathtub rim or shower stall threshold. The identified zone is all -encompassing and shall include the space directly over the bathtub or shower sta ll and the space below this zone, but not space separated by a floor, wall, ceiling, room door, window, or fixed barrier. [406.9(C)] Exceptions: 1. Receptacles installed in accordance with Section E4209.4 shall be permitted. [406.9(C) Exception No. 1] 2. In bathrooms with less than the required zone, the receptacle(s) required by Section E3901.6 shall be permitted to be installed opposite the bathtub rim or shower stall threshold on the farthest wall in the room. [406.9(C) Exception No. 2] 3. Weight-supporting ceiling receptacles (WSCR) shall be permitted to be installed for listed luminaires that employ a weight -supporting attachment fitting (WSAF) in damp locations complying with Section E4003.11. [406.9(C) Exception No. 3] 4. A single receptacle shall be permitted fo r an electronic toilet or personal hygiene device such as an electronic bidet seat. The receptacle shall be readily accessible and not located in the space between the toilet and the bathtub or shower. [406.9(C) Exception No. 4] 96 2024 Building Code Modification Index (11/3/2025 V.1) Page 171 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 71 Code Section: E4002.14 Tamper-resistant receptacles Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 75 E4002.14 Reason: This amendment retains the provisions of the 2017 NEC. It was added in the 2008 NEC and is not based on sound technical information which adequately substantiates that it will result in protecting small children from burns or injury. Concerns were raised over the comprehensiveness of the studies used to substantiate this amendment, as well as how the elderly community would be able to use the tamper - resistant receptacles due to the amount of force required to be applied to insert the plugs. Modification: E4002.14 Tamper-resistant receptacles. In areas specified in Section E3901.1, 15- and 20-ampere, 125- and 250-volt nonlocking-type receptacles shall be listed tamper-resistant receptacles. [406.12] Exception: Receptacles in the following locations shall not be required to be tamper resistant: 1. Receptacles located more than 5.5 feet (1676 mm) above the floor. 2. Receptacles that are part of a luminaire or appliance. 3. A single receptacle that is not readily accessible that supplies a single appliance or a duplex receptacle that is not readily accessible and supplies two appliances where such receptacles are located in spaces occupied by or designated for the appliances served and, under conditions of normal use, the appliances are not easily moved from one place to another. The appliances shall be cord -and-plug-connected to such receptacles in accordance with Section E3909.4. [406.12 Exception] 97 2024 Building Code Modification Index (11/3/2025 V.1) Page 172 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 72 Code Section: Chapter 44 Referenced Standards Proponent: Air-Conditioning, Heating and Refrigeration Institute Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 76 Chapter 44 Reason: The 2022 standards from the original modification request in 2021 are now referenced throughout. However, the below sections were not added to the IRC reference standards. Modification: UL/CSA 60335-2-40—2022: Household and Similar Electrical Appliances—Safety—Part 2-40: Particular Requirements for Electrical Heat Pumps, Air-Conditioners and Dehumidifiers M1402.1, M1403.1, M1412.1, M1413.1, and M2006.1 98 2024 Building Code Modification Index (11/3/2025 V.1) Page 173 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 73 Code Section: Chapter 44 Referenced Standards Proponent: Daikin Comfort Technologies Manufacturing, Inc. Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: This is tied to modification IMC 2024 02: Errors exist in Table 1103.1 of the 2024 IMC, which came from the 2022 edition of ASHRAE 34. These errors have been corrected in the 2024 edition of ASHRAE 34, but are not reflected in Table 1103.1 of the 2024 IMC. The changes hav e been approved for the 2027 IMC using ASHRAE 34 -2024 as the referenced standard in Chapter 15, and those change are reflected in ICA – TSG-000001 – Toto – ASHRAE – 2024 IMC. This proposal is to correct those incorrect values within the Table in accordance with ASHRAE 34-2024. Modification: ASHRAE 34—2022 2024: Designation Classification of Refrigerants M1411.1 99 2024 Building Code Modification Index (11/3/2025 V.1) Page 174 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 74 Code Section: Appendix BF Patio Covers Proponent: Structural Engineers Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 77 Appendix AH IRC 2018 IRC 2018 45 Appendix H IRC 2015 IRC 2015 36 Appendix H IRC 2012 IRC 2012 25 Appendix H Reason: To provide minimum requirements for patio covers for the protection of people and property. Modification: Appendix BF, Patio Covers, is adopted for use statewide. 100 2024 Building Code Modification Index (11/3/2025 V.1) Page 175 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 75 Code Section: Appendix BO Existing Buildings and Structures Proponent: Structural Engineers Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 78 Appendix AJ IRC 2018 IRC 2018 46 Appendix J IRC 2015 IRC 2015 37 Appendix J Reason: To provide guidance for renovating, modifying or updating residential structures in applying the IRC and to help with uniform enforcement of the IRC on renovation projects across the state. Modification: Appendix BO is adopted for use statewide. 101 2024 Building Code Modification Index (11/3/2025 V.1) Page 176 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Residential Code Modification Index Number: IRC 2024 76 Code Section: Appendix BB Tiny Houses Proponent: Building Officials Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 79 Appendix AQ IRC 2018 IRC 2018 47 Appendix Q Reason: Jurisdictions will have more options and flexibility to approve small home construction. Modification: Appendix BB is adopted for use statewide. 102 2024 Building Code Modification Index (11/3/2025 V.1) Page 177 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Fire Code Modification Index Number: IFC 2024 01 Code Section: 202 General Definitions – Primitive camp structure Proponent: Building Officials Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IFC 2021 IFC 2021 02 202 IFC 2018 IFC 2018 02 202 Reason: “Structures primarily used or associated with outdoor camping activities” include, but are not limited to, shelters, tree stands, sheds, rustic cabins, campfire shelters, shelters, tents, tepees, or other indigenous huts used only for campers or program participants, or used in conjunction with outdoor camping activities such as hiking, fishing, hunting, or nature appreciation, regar dless of material used for construction. These structures are not to include utilities such as mechanical, electrical or plumbing. Modification: R02 General Definitions Primitive Camp Structure. Shall include any structure permanent or temporary in nature, used for outdoor camping (transient), open on at least one side with no fully enclosed habitable spaces, less than 400 square feet under roof, and not classified as a residential occupancy due to lack of electrical, plumbing, mechanical, and sprinkler systems. 103 2024 Building Code Modification Index (11/3/2025 V.1) Page 178 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Fire Code Modification Index Number: IFC 2024 02 Code Section: 202 General Definitions – Recreational fire Proponent: South Carolina Fire Marshals Association Previous Code Cycles Previous Modification Number Previous Code Section IFC 2021 IFC 2021 04 202 IFC 2018 IFC 2018 01 202 IFC 2015 IFC 2015 01 202 IFC 2012 IFC 2012 01 202 Reason: The definition of sky lanterns is being proposed to be added to the IFC. The Office of the State Fire Marshal is regularly asked for clarification regarding these devices and how they are being addressed in the IFC. The language in the code for “recreational fire” could be interpreted to exclude sky lanterns. These devices are a serious threat to property and are a life safety hazard. Their use presents a fire hazard caused by their release with no means of control. A sky lantern can achieve great height and distance from its launch area. The final destination is undetermined and these sky lanter ns have been known to cause uncontrolled fires. Modification: R02 General Definitions Recreational Fire. An outdoor fire burning materials other than rubbish where the fuel being burned is not contained in an incinerator, outdoor fireplace, portable outd oor fireplace, barbeque grill or barbeque pit and has a total fuel area of 3 feet (914 mm) or less in diameter and 2 feet (610 mm) or less in height for pleasure, religious, ceremonial to include sky lanterns, cooking, warmth or similar purposes. 104 2024 Building Code Modification Index (11/3/2025 V.1) Page 179 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Fire Code Modification Index Number: IFC 2024 03 Code Section: [BG] 203.2.8 Assembly Group A-3 Proponent: Building Officials Association of South Carolina (BOASC) Previous Code Cycles Previous Modification Number Previous Code Section IRC 2021 IRC 2021 03 202 IFC 2018 IFC 2018 03 202 Reason: Add to the listing of A-3 occupancies the following use: Structures, without a commercial kitchen, used in agritourism activity as defined by S.C. Code Ann. 46-53-10(1). Modification: 203.2.8 Assembly Group A -3. Group A -3 occupancy includes assembly uses intended for worship, recreation or amusement and other assembly uses not classified elsewhere in Group A including, but not limited to: Amusement arcades Art galleries Bowling alleys Community halls Courtrooms Dance halls (not including food or drink consumption) Exhibition halls Funeral parlors Greenhouses for the conservation and exhibition of plants that provide public access Gymnasiums (without spectator seating) Indoor swimming pools (without spectator seating) Indoor tennis courts (without spectator seating) Lecture halls Libraries Museums Places of religious worship Pool and billiard parlors Structures, without a commercial kitchen, used in agritourism activity as defined by S.C. Code Ann. 46-53- 10(1) Waiting areas in transportation terminals 105 2024 Building Code Modification Index (11/3/2025 V.1) Page 180 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Fire Code Modification Index Number: IFC 2024 04 Code Section: 315.3.3 Equipment rooms Proponent: Midlands Fire Marshal Association Previous Code Cycles Previous Modification Number Previous Code Section IFC 2021 IFC 2021 05 315.3.3 Reason: This would permit the authority having jurisdiction to have the owner/occupant label the rooms as “No storage allowed.” Modification: 315.3.3 Equipment rooms. Combustible material shall not be stored in boiler rooms, mechanical rooms, elevator machine rooms, electrical equipment rooms or in fire command centers as specified in Section 508.1.5. Rooms shall be labeled with approved signage "No storage allowed". 106 2024 Building Code Modification Index (11/3/2025 V.1) Page 181 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Fire Code Modification Index Number: IFC 2024 05 Code Section: 503.1.2 Additional access Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IFC 2021 IFC 2021 08 503.1.2 Reason: To add an exception that permits fire apparatus access roads to be a driveway, pathway, or other approved surface that creates a fire lane not accessible to motor vehicles. Modification: 503.1.2 Additional access. The fire code official is authorized to require more than one fire apparatus access road based on the potential for impairment of a single road by vehicle congestion, condition of terrain, climatic conditions or other factors that could limit access. Exception: Where two fire apparatus access roads are required by Section 503.1.2, the additional fire apparatus access road is permitted to be a driveway, pathway, court or other approved fire lane not accessible to public motor vehicles, where designed by a registered design professional to meet the loading requirements and minimum specifications of Section 503, and the surface provides all- weather driving capabilities. Marking or signs shall be provided in accordance with Section 503.3 and Section D103.6. 107 2024 Building Code Modification Index (11/3/2025 V.1) Page 182 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Fire Code Modification Index Number: IFC 2024 06 Code Section: 503.2.1 Dimensions Proponent: Home Builders Association of South Carolina Previous Code Cycles Previous Modification Number Previous Code Section IFC 2021 IFC 2021 10 503.2.1 IFC 2018 IFC 2018 05 503.2.1 IFC 2015 IFC 2015 04 503.2.1 IFC 2012 IFC 2012 04 503.2.1 Reason: To retain the current means by which fire apparatus access and road dimensions are measured. Modification: 503.2.1 Dimensions. Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm) exclusive of shoulders, except for approved security gates in accordance with Section 503.6 and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm). 108 2024 Building Code Modification Index (11/3/2025 V.1) Page 183 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Fire Code Modification Index Number: IFC 2024 07 Code Section: 507.1 Required water supply Proponent: Charleston Fire Department Previous Code Cycles Previous Modification Number Previous Code Section IFC 2021 IFC 2021 11 507.1 IFC 2018 IFC 2018 06 507.1 Reason: This modification attempts to provide clarity . Previous modifications to this section caused confusion regarding the specific application. The information regarding the location and spacing of fire hydrants is now addressed in IFC Section 507.5.1. Modification: 507.1 Required water supply. An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises on which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction to meet the necessary fire flow as determined by the fire code official. Where public water supply is inadequate or not available, an approved alternative water source meeting the fire flow requirements shall be provided. Fire flow performance tests shall be witnessed by the fire code official or representative prior to final approval. Exception: One- and two-family dwellings, including attached or detached accessory structures. 109 2024 Building Code Modification Index (11/3/2025 V.1) Page 184 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Fire Code Modification Index Number: IFC 2024 08 Code Section: 507.5.1 Where required Proponent: Charleston Fire Department Previous Code Cycles Previous Modification Number Previous Code Section IFC 2021 IFC 2021 12 507.5.1 IFC 2018 IFC 2018 07 507.5.1 Reason: A previous modification for hydrant spacing merged multiple sections of the code and caused confusion between IFC 507.1 and 507.5.1. This modification attempts to remove some of the confusion, return to the numbering in the base code, and place the modifications within the appropriate sections while providing clear direction. Modification: 507.5.1 Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 feet (122 m) 500 feet (152m) from a hydrant on a fire apparatus access road, as measured by an approved rout e around the exterior of the facility or building, on -site fire hydrants and mains shall be provided where required by the fire code official. Location. The location and number of hydrants shall be designated by the fire official, but in no case shall the distance between installed fire hydrants exceed 1000 feet (305 m). Fire hydrants shall be located within 500 feet (152 m) of all fire fighter access points when measured along the normal routes of fire department vehicle access which conforms to the requi rements of Section 503. No point of the exterior of a building shall be located more than 500 feet (152 m) from a hydrant accessible to fire department vehicles as provided in Section 503. Exceptions: 1. For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183 m). 2. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2, the distance requirement shall be 600 feet (183 m). 110 2024 Building Code Modification Index (11/3/2025 V.1) Page 185 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Fire Code Modification Index Number: IFC 2024 09 Code Section: 507.5.1.1 Hydrant for standpipe systems Proponent: Midlands Fire Marshal Association Previous Code Cycles Previous Modification Number Previous Code Section IFC 2021 IFC 2021 13 507.5.1.1 Reason: Adds fire sprinkler systems to this section. Modification: 507.5.1.1 Hydrant for standpipe systems. Buildings equipped with a standpipe or fire sprinkler system installed in accordance with Section 903 or 905 shall have a fire hydrant within 100 feet (30 480 mm) of the fire department connections. Exception: The distance shall be permitted to exceed 100 feet (30 480 mm) where approved by the fire code official. 111 2024 Building Code Modification Index (11/3/2025 V.1) Page 186 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Fire Code Modification Index Number: IFC 2024 10 Code Section: 507.5.4 Obstruction Proponent: Midlands Fire Marshal Association Previous Code Cycles Previous Modification Number Previous Code Section IFC 2021 IFC 2021 14 507.5.4 Reason: This is already a state traffic violation. Adding mirrored language to this section allows fire code officials to enforce this violation as well. State traffic law states, SC Title 56-5—3530: Stopping, standing or parking prohibited in specific places; exceptions. Modification: 507.5.4 Obstruction. Unobstructed access to fire hydrants shall be maintained at all times. The fire department shall not be deterred or hindered from gaining immediate access to fire protection equipment or fire hydrants. No parking shall be allowed within 15 feet (4572 mm) of a fire hydrant. 112 2024 Building Code Modification Index (11/3/2025 V.1) Page 187 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Fire Code Modification Index Number: IFC 2024 11 Code Section: 606.3.3.2 Grease accumulation Proponent: Midlands Fire Marshal Association Previous Code Cycles Previous Modification Number Previous Code Section N/A Reason: This request intends to provide a direct reference to NFPA 96 for all operational and maintenance requirements for commerc ial cooking systems. This proposal will made code enforcement by fire code officials more consistent between the IFC and NFPA standards, as all requirements would be sourced from the same document. NFPA 96 is currently a nationally recognized and reference d fire safety standard with limited including in the IFC, and is not directly referenced for the specific purpose of operations and maintenance. The code requirements for new construction and installation of commercial cooking systems would still be in accordance with the South Carolina Building Code and the South Carolina Mechanical Code, as is current practice. Based on the “scoping” of Section 606.3, there would be no conflict between new construction installation requirements. Modification: 606.3.3.2 Grease accumulation. If during the inspection it is found that hoods, grease -removal devices, fans, ducts or other appurtenances have an accumulation of grease, such components shall be cleaned in accordance with ANSI/IKECA C10 and NFPA 96. The cleanings shall be completed by a properly trained and qualified company or person(s) acceptable to the authority having jurisdiction. The individual or company performing the inspections and cleaning shall indicate their certifications to the authority having jurisdiction upon request. 113 2024 Building Code Modification Index (11/3/2025 V.1) Page 188 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Fire Code Modification Index Number: IFC 2024 12 Code Section: 607.1 General Proponent: Midlands Fire Marshal Association Previous Code Cycles Previous Modification Number Previous Code Section IFC 2021 IFC 2021 16 607.1 Reason: The intention is for the types of tanks referenced in this code section to have the contents identified as outlined in Sections 5003.5, 5003.5.1 and NFPA 30. Modification: 607.1 General. Storage of cooking oil (grease) in commercial cooking operations utilizing above -ground tanks with a capacity greater than 60 gal (227 L) installed within a building shall comply with Sections 607.2 through 607.7 and NFPA 30. For purposes of this section, cooking oil shall be classified as a Class IIIB liquid unless otherwise determined by testing. These tanks shall have the contents identified as outlined in Section 5703.5. 114 2024 Building Code Modification Index (11/3/2025 V.1) Page 189 of 246 South Carolina Department of Labor, Licensing and Regulation South Carolina Building Codes Council 2024 Modification Index Applicable Code: 2024 International Fire Code Modification Index Number: IFC 2024 13 Code Section: 901.6.3 Records Proponent: Charleston Fire Department Previous Code Cycles Previous Modification Number Previous Code

Text truncated. Open the original for the full document.

Source: Beaufort County website. First collected Oct 24, 2026.