Natural Resources Committee — Agenda Packet
Beaufort County · Beaufort County · Natural Resources Committee · meeting of Sep 8, 2026 · Agenda packets
Open the original document More from Beaufort County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Natural Resources Committee Meeting
Beaufort County, SC
Council Chambers, Administration Building
Beaufort County Government Robert Smalls Complex
100 Ribaut Road, Beaufort
Tuesday, September 8, 2026
2:00 PM
AGENDA
COMMITTEE MEMBERS:
York Glover, Chair
Gerald Dawson
Anna Maria Tabernik
Lawrence McElynn, Vice-Chairman
Joseph Passiment
Alice Howard, Ex-Officio
1. CALL TO ORDER:
2. PLEDGE OF ALLEGIANCE:
3. STATEMENT OF COMPLIANCE WITH FOIA:
4. APPROVAL OF AGENDA
5. APPROVAL OF MINUTES
● Minutes from August 3, 2026.
6. PUBLIC COMMENT PERIOD – 15 MINUTES TOTAL
7. ASSISTANT COUNTY ADMINISTRATOR REPORT
8. PRESENTATION AND DISCUSSION ITEMS
a. Data Center Regulation Approaches and Options (FISCAL IMPACT: No fiscal impact.) - Juliana
Zadik, Rob Merchant, Dylan Kidd
9. AGENDA ITEMS
a. An Ordinance authorizing the County Administrator to execute an Electric Line Easement with
Dominion Energy on the property known as Pocotaligo Preserve (TMS R710 012 000 0001 0000
and R710 012 000 0072 0000). (FISCAL IMPACT: There is no fiscal impact. Dominion will fully
fund the relocation of the electrical line.) - Dylan Kidd, Interim Assistant County Administrator, 5
minutes
b. A Resolution authorizing the County Administrator to enter into a License Agreement with the State
of South Carolina for the repair of a “Flywheel” artifact to be installed and displayed at Fort Fremont
Preserve. (FISCAL IMPACT: There is no fiscal impact to the County.) - Dylan Kidd, Interim ACA
Development (5 minutes)
Page 1 of 221
c. An Ordinance amending the Beaufort County Code of Ordinances, Chapter74 - Building and
Building Regulations, Section 74-64, Adoption of Building Codes (Amends Code of Ordinances to
adopt the 2024 State Mandated Code Editons). (FISCAL IMPACT: No Fiscal Impact) - Michael
Brantley, Director Building Services, 5 minutes
10. ADJOURNMENT
To watch committee or County Council meetings or for a complete list of agendas and backup packages,
please visit: https://beaufortcountysc.gov/council/council-committee-meetings/index.html
Page 2 of 221
Natural Resources Committee Meeting
Beaufort County, SC
Council Chambers, Administration Building
Beaufort County Government Robert Smalls Complex
100 Ribaut Road, Beaufort
Monday, August 3, 2026
4:00 PM
MINUTES
Watch the video stream available on the County's website to hear the Council’s discussion of a specific topic or the
complete meeting https://beaufortcountysc.new.swagit.com/videos/395100
1. Call to Order
Committee Chair Glover called the meeting to order at 4:18 PM
Present
Committee Chair York Glover
Committee Member Gerald Dawson - Virtual
Committee Vice-Chair Lawrence McElynn - Virtual
Committee Member Anna Maria Tabernik
Ex-Officio Alice Howard
Committee Member Passiment
Council Member David Bartholomew - @4:33 PM
Absent
Council Member Paula Brown
Council Member Logan Cunningham
Council Member Mark Lawson
Council Member Thomas Reitz
2. Pledge of Allegiance
Committee Chair Glover led the Pledge of Allegiance.
3. Statement of Compliance with FOIA
Committee Chair Glover stated that public notification of this meeting had been published, posted, and
distributed in compliance with SC FOIA.
4. Approval of Agenda
Motion: It was moved by Council Member Passiment, seconded by Council Member Tabernik to
approve the agenda.
The Vote - Voting Yea: Committee Chair Glover, Committee Vice-Chair McElynn, Committee Member
Dawson, Committee Member Tabernik, Ex-Officio Howard, and Committee Member Passiment. The
motion passed 6:0.
Page 3 of 221
5. Approval of Minutes
Motion: It was moved by Committee Member Passiment, seconded by Committee Member Tabernik to
approve the minutes from May 4, 2026, and Special Called Meeting June 15, 2026.
The Vote - Voting Yea: Committee Chair Glover, Committee Vice-Chair McElynn, Committee Member
Dawson, Committee Member Tabernik, Ex-Officio Howard, and Committee Member Passiment. The
motion passed 6:0.
6. Public Comment Period
Public comments were taken. Please watch the video stream on the county's website to view the full
comment period. https://beaufortcountysc.new.swagit.com/videos/395100
7. Assistant County Administrator Report
Jared Fralix, Assistant County Administrator, gave an update on the status of the famous tree near the
Pat Conroy Literacy Center. Please watch the video stream on the county's website to view the full
report. https://beaufortcountysc.new.swagit.com/videos/395100
8. Presentation and Discussion Items
a. Update on Green Space Program (FISCAL IMPACT: ) - Michael McShane, Green Space
Committee Chair
Michael McShane, Green Space Committee Chair, provided a Green Space program project update.
Please watch the video stream on the county's website to view the full update.
https://beaufortcountysc.new.swagit.com/videos/395100
b. Discussion regarding Data Centers (FISCAL IMPACT: ) -
The committee gave directions to staff to bring back options for consideration for data centers. Please
watch the video stream on the county's website to view the full discussion.
https://beaufortcountysc.new.swagit.com/videos/395100
9. Agenda Items
a. 2026/33: An Ordinance Amending the Community Development Code (CDC): Division 5.10
(Historic Preservation), Section 7.2.120 (Certificate Of Appropriateness), Section 7.3.80 (Historic
Designation), Section 7.4.50 (Public Hearing Scheduling and Notice), and Section 7.5.40 (Historic
Preservation Review Board (Hprb)).
The vote at Natural Resources Committee on May 4, 2026 - 6:0
The vote at First Reading on May 26, 2026 - 9:1
The vote to defer Second Reading until the June 22, 2026 County Council meeting on June 8,
2026 - 11:0
The vote to remand back to Natural Resources committee on June 22, 2026 - 6:5 (FISCAL
IMPACT: ) - Robert Merchant, AICP, Beaufort County Planning and Zoning Department
Motion: It was moved by Committee Member Passiment, seconded by Council Member Bartholomew to
deny the request for the text amendment for the following reasons: it is not consistent with the goals,
objectives, and policies of the comprehensive plan; it is in conflict with any provision of this development
code or the code of ordinances; it is not required by changed conditions; it does not address a
demonstrated community need; it is not consistent with the purpose and intent of the zones in this
development code, or would improve compatibility among uses and ensure efficient development within
the county; it would not result in a logical and orderly development pattern; and it would result in adverse
impacts on the natural environment including but not limited to water, air, noise, stormwater
management, wildlife, vegetation, wetlands, and the natural functioning of the environment.
Page 4 of 221
The Vote - Voting Yea: Committee Member Dawson, Committee Member Tabernik, Committee
Member Passiment, and Council Member Bartholomew
Voting Nay: Committee Chair Glover, Committee Vice-Chair McElynn, and Ex-Officio Howard. The
motion passed 4:3.
b. An Ordinance amending the Community Development Code (CDC): section 5.3.20 (applicability),
4.2.20 (standards for free-standing accessory buildings/structures), 5.8.100 (screening), and
10.1.190 (definitions) (FISCAL IMPACT: n/a) - Robert Merchant
Motion: It was moved by Committee Member Passiment, seconded by Ex-Officio Howard to approve
the request for the text amendment for the following reasons: it is consistent with the goals, objectives,
and policies of the comprehensive plan; it is not in conflict with any provision of this development code
or the code of ordinances; it is not required by changed conditions; it does address a demonstrated
community need; it is consistent with the purpose and intent of the zones in this development code or
would improve compatibility among uses and ensure efficient development within the county; it would
result in a logical and orderly development pattern; and it would not result in adverse impacts on the
natural environment including but not limited to water, air, noise, stormwater management, wildlife,
vegetation, wetlands, and the natural functioning of the environment.
The Vote - Voting Yea: Committee Chair Glover, Committee Vice-Chair McElynn, Committee Member
Dawson, Committee Member Tabernik, Ex-Officio Howard, Committee Member Passiment, and Council
Member Bartholomew. The motion passed 7:0.
c. An Ordinance amending the zoning map for 1.4 acres (r300 012 000 0129 0000, r300 012 000
047a 0000) from T2R to T2RC (FISCAL IMPACT: n/a) - Robert Merchant
Motion: It was moved by Committee Member Passiment, seconded by Ex-Officio Howard to approve
the request for rezoning for the following reasons: it is consistent with the goals and policies of the
comprehensive code and the purposes of the development code; it is not in conflict with provisions of
the development code and our code of ordinances; it is not required by changed conditions; it is
compatible with existing and proposed use of land surrounding this land; it would result in logical and
orderly development patterns; it would not result in adverse impact on the natural environment, water,
air, noise, stormwater management, wildlife, vegetation, wetlands, and the natural functioning of the
environment; and it would result in development that is adequately served by public facilities, streets,
potable water, sewer, stormwater management, solid waste collection and disposal, schools, parks,
police, fire, emergency medical facilities.
The Vote - Voting Yea: Committee Chair Glover, Committee Vice-Chair McElynn, Committee Member
Dawson, Committee Member Tabernik, Ex-Officio Howard, Committee Member Passiment, and Council
Member Bartholomew. The motion passed 7:0.
d. A Resolution authorizing the county administrator to execute a memorandum of agreement to
engage in discussions about improvements and usage of the Battle of Port Royal Island site,
subject to appropriate approval and securing of funding (FISCAL IMPACT: Unknown) - Monica
Main, Deputy County Attorney; Stefanie Nagid, Director of Land Preservation; and Beaufort
County 250th Commission
Motion: It was moved by Committee Member Passiment, seconded by Council Member Bartholomew to
approve a Resolution authorizing the county administrator to execute a memorandum of agreement to
engage in discussions about improvements and usage of the Battle of Port Royal Island site, subject to
appropriate approval and securing of funding.
The Vote - Voting Yea: Committee Chair Glover, Committee Vice-Chair McElynn, Committee Member
Dawson, Ex-Officio Howard, Committee Member Passiment, and Council Member Bartholomew.
Page 5 of 221
Voting Nay: Committee Member Tabernik. The motion passed 6:1.
e. Approval and authorization for the county administrator to enter into an agreement for a public-
private partnership with Brickyard Commons, LLC for a Royal Pines drainage project. (FISCAL
IMPACT: The total cost of the project is $3,475,000 that would be paid from Stormwater
Utility 5025-90-9020-54420 with a balance of $6,275,000.00) - Jared Fralix, Assistant County
Administrator, 10 minutes
Motion: It was moved by Committee Member Passiment, seconded by Council Member Bartholomew to
approve the approval and authorization for the county administrator to enter into an agreement for a
public-private partnership with Brickyard Commons, LLC for a Royal Pines drainage project.
The Vote - Voting Yea: Committee Chair Glover, Committee Vice-Chair McElynn, Committee Member
Dawson, Committee Member Tabernik, Ex-Officio Howard, Committee Member Passiment, and Council
Member Bartholomew. The motion passed 7:0.
10. Adjournment
Ratified:
Page 6 of 221
BEAUFORT COUNTY
NATURAL RESOURCES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
DATA CENTER REGULATION APPROACHES AND OPTIONS
MEETING NAME AND DATE:
Natural Resources Committee September 8, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends that Committee provide guidance regarding any and all regulations that should be brought
forward to Planning Commission, Committee, and Council for consideration and potential implementation.
PRESENTER INFORMATION:
Juliana Zadik, Rob Merchant, Dylan Kidd
ITEM BACKGROUND:
Pursuant to Committee's direction, Staff has researched options for regulating any future data centers to be
built in Beaufort County. Staff will present relevant considerations and approaches adopted by other
jurisdictions and seek guidance from Committee as to which, if any, should be brought forward to Planning
Commission, and subsequently to Committee and Council.
FISCAL IMPACT:
No fiscal impact.
APPROVAL HISTORY:
Page 7 of 221
MEMORANDUM
TO: York Glover, Chair, Natural Resources Committee of County Council
FROM: Rob Merchant, Director, Beaufort County Planning & Zoning Department
DATE: September 8, 2026
SUBJECT: DATA CENTERS
At the August 3
rd, 2026 Natural Resources Committee meeting, Staff was directed to look into
data centers and options for addressing this use. Currently, data centers are not specifically
regulated in many counties in South Carolina, including Beaufort County, but many are taking
action to begin to explore this use and how it fits within their communities.
Some of the tools available for local governments to regulate data centers are:
1. Banning the use entirely
This option would prohibit the use entirely within the jurisdiction.
2. Developing regulations for this use
This option would regulate the location and conditions, including any potential adverse
impacts, within the jurisdiction.
3. Utilizing a temporary moratorium to study and develop regulatory options for this
use
This option would temporarily prohibit the use while the jurisdiction develops a
permanent regulatory solution to address the use. Moratoriums are not meant to be
permanent but give the jurisdiction a specific timeframe to consider all regulatory
options.
4. Taking no action
Common factors to consider when regulating data centers include:
• Energy Sources and Usage Rates
• Water-based Cooling Systems, Sources, and Usage Rates
• Buffers and Setbacks to Surrounding Uses
• Back-up Electricity Generation and Sources
• Noise Impacts
• Light, Water, Air, and/or Runoff Pollution
Included with this agenda item are the following resources:
• List of South Carolina counties considering moratoriums
• Using a Development Moratorium Correctly
• Colleton County’s Data Center Moratorium Ordinance
• Guide for Data Center Approaches
• General Model Ordinance for Temporary Data Center Moratorium
• Example Ordinance Prohibiting Data Centers
Page 8 of 221
Here's a list of all SC Counties that have adopted or are considering moratoriums on Data
Centers. The highlighted red information is incomplete. I was unable to find the most
recent updates (minutes not yet published, etc). We may want to contact those Counties to
confirm status/outcomes:
12-month moratoriums
Greenwood County - Adopted July 21, 2026. 12-month moratorium. Article.
Newberry County - Adopted June 1, 2026. 12-month moratorium.
Fairfield County - Awaiting third and final reading. Proposed 12-month moratorium. Article.
Laurens County - Awaiting third and final reading. Proposed 12-month moratorium. Article.
Kershaw County - Awaiting first reading (tonight, August 25ht). Proposed 12-month
moratorium. Article.
9-month moratoriums
York County - Adopted July 13, 2026. 9-month moratorium. County info here.
McCormick County - Awaiting Council Consideration (PC has advanced). Proposed 9-
month moratorium. Article.
6-month moratoriums
Chesterfield County - Adopted June 1, 2026. 6-month moratorium.
Colleton County - Adopted July 6, 2026. 6-month moratorium.
Chester County - Adopted July 16, 2026. 6-month moratorium. Article.
Anderson County - Adopted on August 18, 2026. 6-month moratorium. Article.
Orangeburg County - Awaiting 3rd reading, Town Hall Meeting tonight (Aug 25th). Proposed
6-month moratorium. Article.
Clarendon County - Awaiting 2nd reading. Proposed 6-month moratorium. Article.
180-day moratorium
Sumter County - Third and final reading was on August 11th, unsure of outcome. 180-day
moratorium.
Page 9 of 221
STATE OF SOUTH CAROLINA
COUNTY OF BEAUFORT
BEAUFORT COUNTY COUNCIL
ORDINANCE NO. 2026/____
AN ORDINANCE TO AMEND THE BEAUFORT COUNTY COMMUNITY
DEVELOPMENT CODE TO PROHIBIT DATA CENTERS AS A PERMITTED,
CONDITIONAL, OR ACCESSORY USE IN ALL ZONING DISTRICTS OF BEAUFORT
COUNTY, SOUTH CAROLINA; TO DEFINE "DATA CENTER"; TO ESTABLISH
APPLICABILITY TO PENDING AND FUTURE APPLICATIONS; TO PROVIDE FOR
VESTED RIGHTS AND NONCONFORMITIES; TO PROVIDE FOR SEVERABILITY;
AND TO PROVIDE AN EFFECTIVE DATE.
WHEREAS, Beaufort County has adopted the Beaufort County Community Development
Code (the “Development Code”) pursuant to the South Carolina Local Government
Comprehensive Planning Enabling Act of 1994, S.C. Code Ann. § 6- 29-310 et seq., and
specifically the zoning authority conferred by S.C. Code Ann. § 6-29-720, to implement the goals,
objectives, and land use policies of the Beaufort County Comprehensive Plan; and
WHEREAS, large-scale data centers, defined generally as facilities primarily housing
computer servers, network infrastructure, and associated cooling, backup power, and switching
equipment for the storage, processing, management, or distribution of data, are land uses that are
fundamentally distinct in character, intensity, and community benefit from the residential,
commercial, mixed-use, agricultural, and light industrial uses contemplated by the Development
Code and the Comprehensive Plan; and
WHEREAS, data centers characteristically require large, continuous volumes of potable
and/or non-potable water for cooling, substantial and often continuous electric load on the order
of tens to hundreds of megawatts, extensive backup diesel or natural gas generati on, and high-
capacity transmission infrastructure, each of which places direct and disproportionate demands on
Beaufort County’s water resources, electric grid capacity, and air quality, and each of which is
inconsistent with the rural, coastal, and low-impact development character that the Comprehensive
Plan and the Development Code are designed to protect; and
WHEREAS, Beaufort County’s natural resources, including its sole -source and shallow
aquifers, tidal creeks, salt marsh, and the Port Royal Sound and May, Broad, Chechessee, Coosaw,
and Combahee River systems, are finite, ecologically sensitive, and already subject to documented
saltwater intrusion, withdrawal, and water- quality pressures, such that the introduction of a high
water and high energy consumption industrial use of this kind poses an unacceptable risk to those
resources and to the County’s long-term water and energy planning; and
Page 10 of 221
WHEREAS, data centers typically generate comparatively few permanent jobs per acre
and per dollar of capital investment relative to other commercial and industrial uses, generate
continuous mechanical and generator noise, require large impervious footprints and per imeter
security fencing inconsistent with the pedestrian-oriented and form-based design standards of the
Development Code, and are generally incompatible, in scale, appearance, traffic generation, and
neighborhood integration, with the character of the com munities, neighborhoods, and rural
districts of Beaufort County; and
WHEREAS, County Council finds that the values, environmental resources, infrastructure
capacity, and community character of Beaufort County are best protected by prohibiting data
centers as a use in all zoning districts of the County, rather than by attempting to m itigate their
impacts through conditional use, special exception, or performance standards review; and
WHEREAS, the Beaufort County Planning Commission has reviewed this proposed text
amendment to the Development Code for consistency with the Comprehensive Plan and has
forwarded its recommendation to County Council in accordance with S.C. Code Ann. § 6-29-720
and 6-29-760; and
WHEREAS, County Council finds that this Ordinance is a valid and reasonable exercise
of the County’s zoning and police power authority under S.C. Code Ann. § 4-9-25 and Chapter 29
of Title 6 of the South Carolina Code of Laws, bears a rational relationship to legit imate
governmental interests in protecting public health, safety, welfare, water and energy resources, and
community character, and is consistent with and implements the Beaufort County Comprehensive
Plan;
NOW, THEREFORE, BE IT ORDAINED by the County Council of Beaufort County,
South Carolina, in Council duly assembled, as follows:
SECTION 1. FINDINGS.
The foregoing recitals are incorporated herein as findings of County Council. County Council
further finds that the prohibition enacted by this Ordinance applies uniformly to the use
denominated “Data Center” as defined in Section 2 of this Ordinance, throughout every zoning
district established under Article 3 of the Development Co de, including all Transect Zones,
Conventional Zones, and Overlay Zones, and is not directed at any specific applicant, parcel, or
pending application.
SECTION 2. DEFINITION ADDED.
Article 10.1.40 (D Definitions) of the Development Code is hereby amended to add the following
definition, inserted in alphabetical order:
Page 11 of 221
Data Center. A building, structure, or portion thereof, or a campus of such buildings or
structures, designed, constructed, or used primarily to house computer servers, data storage
systems, network switching or routing equipment, or related electronic data processing
equipment, together with the associated cooling systems (including but not limited to
chillers, cooling towers, and water -based cooling infrastructure), uninterruptible power
supply systems, backup or standby electric generation equipment, and dedicated electrical
substation or switchgear infrastructure serving such use. The term includes, without
limitation, facilities marketed, described, or classified as “colocation facilities,” “server
farms,” “hyperscale data centers,” “enterprise data centers,” and “cloud computing
facilities,” regardless of the number of tenants. The term does not include: (i) computer or
server rooms accessory to and located within a principal building whose primary use is not
data processing or storage, provided such accessory space does not exceed [___] square
feet of floor area and does not require dedicated new electrical substation infrastructure;
(ii) equipment shelters, cabinets, or structures accessory to a wireless communication
facility or wireline telecommunications facility otherwise regulated under Article 4 of this
Code; or (iii) facilities operated directly by Beaufort County, the State of South Carolina,
or a federal agency for internal governmental information technology functions and not
offered for lease, colocation, or commercial data-hosting purposes to third parties.
SECTION 3. USE TABLE AMENDED — DATA CENTERS PROHIBITED IN ALL
ZONING DISTRICTS.
Article 4 (Specific to Use) of the Development Code, including the Table of Allowed Uses (and
any corresponding use tables in Article 3 to include but not limited to, Consolidated Use Table
3.1.60, Division 3.2 (Transect Zones) and Division 3.3 (Conventional Zones)), is hereby amended
to add the use “Data Center” as a listed use, designated “Use Not Allowed” (“—”) in every zoning
district of Beaufort County, as follows:
Use All Transect Zones
(T1-T4, TNCP)
All Conventional &
Overlay Zones
Data Center (as defined in Article 10) — Use Not Allowed — Use Not Allowed
This prohibition applies without exception in every zoning district of the County, including
without limitation districts in which data processing, office, commercial, or industrial uses are
otherwise permitted, conditionally permitted, or permitted subjec t to design or performance
standards. No conditional use permit, special exception, variance, planned development district,
Traditional Community Plan designation, or development agreement may be used to authorize a
Data Center use.
SECTION 4. ACCESSORY AND TEMPORARY USES.
No structure, equipment, or infrastructure that would independently meet the definition of “Data
Center” in Section 2 of this Ordinance may be established as an accessory use, temporary use, or
phase of any otherwise permitted principal use. This Section does not prohibit ordinary
Page 12 of 221
information technology infrastructure accessory to a lawful principal use that falls within the
exclusions in Section 2 of this Ordinance.
SECTION 5. APPLICABILITY; PENDING APPLICATIONS; VESTED RIGHTS.
This Ordinance applies to all applications for rezoning, conditional use approval, site plan
approval, development plan approval, and building or zoning permits for a Data Center use that
have not received final, unappealable approval as of the effective date of this Ordinance. In
accordance with S.C. Code Ann. § 6-29-1510 et seq. nothing in this Ordinance shall be construed
to divest a vested right established prior to the effective date of this Ordinance through the approval
of a site-specific development plan, a recorded development agreement under S.C. Code Ann. §
6-31-10 et seq., or other vesting mechanism recognized under South Carolina law. In the absence
of such a vested right, no applicant shall acquire a right to establish a Data Center use in Beaufort
County based solely on the filing of an application, the payment of fees, pre -application
conferences, or informal staff communications.
SECTION 6. NONCONFORMITIES.
Any Data Center lawfully established and in operation prior to the effective date of this Ordinance
shall be treated as a nonconforming use under Article 8 (Nonconformities) of the Development
Code, and shall not be expanded, enlarged, or increased in capacity (including additional building
floor area, additional electrical load, or additional server or cooling capacity beyond that lawfully
in place as of the effective date), and shall be subject to the discontinuance and restoration
limitations generally applicable to nonconforming uses under Article 8.
SECTION 7. CONFLICTING PROVISIONS.
All ordinances, resolutions, and provisions of the Development Code or the Beaufort County Code
of Ordinances in conflict with this Ordinance are hereby repealed to the extent of such conflict.
SECTION 8. SEVERABILITY.
If any section, subsection, sentence, clause, phrase, or portion of this Ordinance is for any reason
held invalid or unconstitutional by any court of competent jurisdiction, such portion shall be
deemed a separate, distinct, and independent provision, and such holding shall not affect the
validity of the remaining portions of this Ordinance. County Council hereby declares that it would
have enacted this Ordinance and each section, subsection, clause, and phrase thereof irrespective
of the fact that any one or more sections, subsections, clauses, or phrases be declared invalid.
Page 13 of 221
SECTION 9. EFFECTIVE DATE.
This Ordinance shall become effective immediately upon third and final reading by County
Council and ratification in accordance with the Beaufort County Code of Ordinances and
applicable South Carolina law.
Read the first time this ____ day of ______________, 2026.
Read the second time this ____ day of ______________, 2026.
Read the third time and ratified this ____ day of ______________, 2026.
BEAUFORT COUNTY COUNCIL
_______________________________________
Chairman, Beaufort County Council
ATTEST:
_______________________________________
Clerk to Council
Approved as to form:
_______________________________________
County Attorney
Page 14 of 221
Page 15 of 221
Page 16 of 221
Page 17 of 221
Page 18 of 221
Page 19 of 221
Page 20 of 221
AN EMERGENCY ORDINANCE DECLARING A TEMPORARY MORATORIUM ON THE ACCEPTANCE OF, REVIEW OF, AND/OR ACTION UPON APPLICATIONS FOR REZONING, SPECIAL EXCEPTIONS, SPECIAL USE PERMITS, BUILDING PERMITS, SITE PLANS, PLAN OF DEVELOPMENT FOR SITING, ECONOMIC INCENTIVES, FEE IN LIEU OF TAXES OR ANY OTHER FORM OF INCENTIVE, THAT WOULD AUTHORIZE OR PERMIT THE DEVELOPMENT OR CONSTRUCTION OF DATA CENTERS, DATA PROCESSING FACILITIES, CRYPTOCURRENCY MINING OPERATIONS OR ANY OTHER USES ASSOCIATED WITH DATA PROCESSING FACILITIES WITHIN _____ COUNTY; AND ADDRESSING OTHER MATTERS RELATED HITHERTO. WHEREAS, _____ County Council has observed an increase in the number of data centers seeking to locate to the State of South Carolina; and WHEREAS, the ____ County Council recognizes that the construction and operation of such facilities if not properly regulated, may adversely impact the residents of _____ County, including but not limited to placing significant demands on the local electrical grid and water supply, contributing to air pollution, generating electronic waste, and producing noise and light pollution; and WHEREAS, given the risks associated with such facilities, _____ County Council is informed and believes that an emergency situation exists in that the ____ County Code of Ordinances does not provide an adequate mechanism to regulate and control the location, design, size, density, land use, and infrastructure needs for data centers, data processing facilities, and cryptocurrency mining operations; and WHEREAS, the Tribal Alliance of South Carolina Nations’ Treaty asserts State and Federal acknowledgement of sovereignty over Tribal lands and cultural interests, _____ County Council will conduct interest meetings with signatory Tribal Councils whose grounds are within the County or which may be affected by data centers, data processing facilities, cryptocurrency mining operations, and related infrastructure; and WHEREAS, the _____ County Code of Ordinances does not define ‘data center,’ ‘data processing facility,’ or ‘cryptocurrency mining operation’ and does not make any reference to such facilities; and
Page 21 of 221
WHEREAS, ______ County Council believes that time is needed so that the Council and staff can study the impacts of data centers, data processing facilities, cryptocurrency mining, and any other uses associated with data processing facilities on communities, and develop reasonable regulations that will promote the safety and wellbeing of its citizens; and WHEREAS, _______ County Council believes that this moratorium will protect the public interest and welfare of the citizens of _____ County until such regulations regarding the aforementioned uses are adopted. NOW, THEREFORE, BE IT ORDAINED BY ______ COUNTY COUNCIL: Section 1. Moratorium. ______ County Council hereby declares a temporary moratorium on the acceptance of, review of, and/or action upon applications for rezoning, special exceptions, special use permits, building permits, site plans, plan of development for siting, economic incentives, or fee in lieu of taxes, that would incentivize, authorize, or permit the development or construction of data centers, data processing facilities, cryptocurrency mining operations, or any other uses associated with data processing facilities within _____ County. This moratorium will allow the County time to study the impacts of data centers and consider potential improvements to County ordinances, informed through a series of public hearings. This moratorium also applies to expansions of existing data centers that would increase energy demands by one (1) megawatt or more. This moratorium shall take effect immediately and shall remain in effect for one (1) year. Council may extend the moratorium by resolution for periods of six (6) months. Section 2. Definitions. For the purposes of this moratorium, a ‘data center’ or ‘data processing facility’ is a building or group of buildings or facilities that is used by an entity or other business enterprise to operate, manage, or maintain a computer, group of computers, or other organized assembly of hardware and software for the primary purpose of storing, retrieving, or transmitting digital data and that has a peak demand of one (1) megawatt or greater. Such uses include but are not limited to computationally intensive applications such as cryptocurrency mining, artificial intelligence (A.I.) computing, application hosting, cloud storage, and video and technical streaming services.
Page 22 of 221
These facilities may also include supporting infrastructure such as air handling systems, backup power generation, water cooling and storage systems, utility substations, and other related equipment necessary for operations. Section 3. Severability. Severability is intended throughout and within the provisions of this Ordinance. If any section, subsection, sentence, clause, phrase or portion of this Ordinance is held to be invalid or unconstitutional by a court of competent jurisdiction, then that decision shall not affect the validity of the remaining portions of this Ordinance. Section 4. Repeal. All ordinances or parts of ordinances in conflict with this Ordinance, or inconsistent with its provisions, are hereby repealed or superseded to the extent necessary to give this Ordinance full force and effect. Section 5. Pending Ordinance Doctrine. This Ordinance is subject to the Pending Ordinance Doctrine. Section 6. Effective Date. This ordinance is effective immediately and shall remain in effect for one (1) year thereafter pursuant to S.C. Code Ann. §4-9-130 and resolution of Council to extend the moratorium. Adopted this ___th day of ___, 2026.
Page 23 of 221
Getting It Right:
Local Approaches to
Data Center Development
Page 24 of 221
Getting It Right:
Local Approaches to Data Center Development
JANUARY 2026
For more information, contact:
Morgan Butler, SELC Senior Attorney
mbutler@selc.org
Christina Libre, SELC Associate Attorney
clibre@selc.org
Southern Environmental Law Center
120 Garrett Street, Suite 400
Charlottesville, VA 22902
Cover photo ©Sanjay Suchak
The Southern Environmental Law Center is a nonpartisan, nonprofit
organization that works throughout six Southern states to promote
policies and decisions that strengthen our communities and protect
our environment, health, and natural resources.
Page 25 of 221
1
Data centers — large facilities that house the
computer systems and associated components used
to store, process, and distribute massive volumes of
digital information — are an increasingly prominent
part of our modern society. But for all the services
they enable and the tax revenue they can generate,
data centers are extremely resource-intensive and can
consume vast amounts of energy, water, and land.
Their explosive growth in many areas of the country
in recent years is putting tremendous pressure on
energy systems, electricity rates, water supplies, and
natural and historic resources, while often generating
significant air and noise pollution. It is crucial that
all levels of government work to ensure that data
center development occurs in a way that safeguards
communities, public health, and the environment.
However, local governments have a particularly
important role to play because local zoning authority
often provides communities with their best —
and sometimes only — opportunity to exert any
meaningful influence over data center development.
SELC has been advocating on data center land use
issues for several years, and this report offers various
considerations for using zoning ordinances and
local advocacy to address the unique challenges data
centers present. Zoning ordinances that promote
transparent and accountable decision-making
and facilitate informed public engagement can
help ensure that local residents themselves, not
developers and data center companies, determine
how this industry impacts their communities.
Section 1 of this report provides general information
on some of the community and environmental
impacts that data centers can cause and that are
important for communities and their elected officials
to understand. Section 2 discusses various options
for how local zoning ordinances can effectively
empower local governing bodies — and, by extension,
the public — to address data center development
in an informed, responsible, and transparent way.
Section 3 covers the inclusion of data center-specific
development requirements in zoning ordinances
and summarizes examples of provisions from
several localities in Virginia, the state that has
experienced the most data center development.
Finally, Section 4 offers general suggestions for
how local residents can engage most effectively on
individual data center proposals.
Introduction
©SANJAY SUCHAK
Page 26 of 221
2
Data center development can cause substantial
community, environmental, and other impacts. The
impacts discussed in this section are only a partial list
that reflects those often causing the most concern.
Energy
Data centers require a tremendous amount of
electricity to both power their computer servers
and to operate the cooling systems that keep the
servers at an optimal temperature. A large hyperscale
data center operated by major tech companies like
Amazon, Google, and Microsoft can use as much
power as roughly 80,000 homes.1 Utilities across the
country are pointing to this power demand to justify
the buildout of expensive, polluting power facilities
— undermining climate emission reduction goals
and driving up electricity bills.
Water
Data centers can also consume vast amounts of water,
particularly when they rely on water for their cooling
needs. Lawrence Berkeley National Laboratory found
that in 2023 alone, U.S. data centers consumed
approximately 66 billion liters (or 17.4 billion gallons)
of water.2 This amount of water — which does not
capture any of the data centers built in the U.S. in the
last two years — would satisfy the household needs
of nearly 160,000 American families for an entire
year.3 The hyperscale data centers of one large tech
company reportedly use approximately 200 million
gallons of water — per facility — in a single year.4
For context, that amount of water would fill an
Olympic-sized swimming pool stretched to a length
of over 9 miles. Further, these figures do not account
for the substantial amount of water that is consumed
in the process of generating the power that data
centers use.5
Air Pollution
As noted above, utilities are using data center power
demand to justify building new fossil fuel power
plants that emit harmful air pollutants, including
sulfur dioxide (SO2), nitrogen oxides (NOX), and
fine particulate matter (PM2.5).6 These pollutants
are associated with cardiovascular and respiratory
illnesses7 and place residents at higher risk of
hospitalization.8 In some instances, developers have
proposed to build polluting fossil fuel power plants
on the same site as data centers to avoid having to
purchase primary power from the electric grid.
SECTION 1
Environmental and Community Impacts
©BRANDON DILL
Page 27 of 221
3
For example, a recent rezoning request to allow a
data center campus in Pittsylvania County, Virginia,
included a proposed gas-fired power plant to provide
power to a data center campus. A report from the
Harvard Data Science Initiative and the lab of Dr.
Francesca Dominici conservatively estimated that
the proposed gas plant would have emitted 326.53
tons of fine particulate matter each year, exposing
more than 17,500 people to concentrations of this
pollutant associated with severe health impacts,
including heart attack, pneumonia, or, in some
cases, stroke
or cancer.9
In addition, data centers are typically equipped with
commercial-scale, diesel-powered generators to
ensure a constant source of power during electricity
outages. Large data centers can have dozens or even
hundreds of these backup generators on site, and
they emit many of the same harmful pollutants
described above. Even though they are usually only
operated during power losses and for testing, these
generators can still be a problem for those who live
and work nearby.
Land Use and Community Impacts
Data center development can consume natural areas
and large swaths of undeveloped land, especially
as developers seek to co-locate multiple facilities
and create data center “campuses” that can occupy
thousands of acres.10 In Virginia — the state with
the most data center development11 — over 340 data
centers totaling 63 million square feet of data center
space and occupying roughly 7,200 acres of land12
had already been built as of 2024, and significant
additional construction in 2025 has increased these
numbers even further. But Virginia is not alone, as
data center development is accelerating in other
states and communities across the country. Without
proper land use planning and design standards, data
center development can lead to sprawl, destruction
of valuable habitat and farmland, damage to historic
and scenic viewsheds, and loss of land that would be
better used for housing, employment, and other local
needs and opportunities.
Data centers can also be particularly disruptive to
nearby homes, businesses, and other community
resources such as schools. They often emit around-
the-clock noise from the constant humming of fans
and other equipment used in their cooling systems.
The large buildings and the vast areas of pavement
that surround them can also increase polluted
stormwater runoff into local bodies of water. And,
as described above, the air pollution from onsite
power generation can harm nearby residents’ health.
Data center development can also result in indirect
impacts that go well beyond the immediate vicinity
of the facility itself, like construction of new electric
transmission infrastructure to connect data centers
to power sources.
©SANJAY SUCHAK
Page 28 of 221
4
Key considerations include whether a locality’s
zoning ordinance provides the governing body with
the ability to review and either approve or deny
data center proposals, and whether the ordinance
provides meaningful opportunities for public
comment. These essential protections can take
various forms, and the mechanisms are different
in each state due to differences in state land use
law. This report highlights some options available
under Virginia zoning law because that is where
much of the local land use work on data centers has
been done to date. Although these Virginia-specific
options are likely similar to potential options in most
other states, it is necessary to assess your own state
and locality’s land use laws to determine the extent
of their applicability, and the ideas and options
offered in this document should not be considered
legal advice.
BACKGROUND INFORMA TION ON ZONING
Local zoning ordinances typically divide the territory
of a locality into different zoning districts (e.g., Light
Industrial, Heavy Industrial, Highway Commercial,
Residential, Agricultural). The specific areas of the
locality that fall within each zoning district are shown
on the locality’s official zoning map.
Each zoning district’s regulations typically include
lists of specific land uses that are permissible within
that district, such as office buildings, apartment
buildings, warehouses, and data centers. When a
developer seeks to build a particular land use on a
specific parcel, the applicable review process will be
dictated by whether the proposed use on that parcel
is allowed “by right,” requires approval as a “special
use,” or would require a rezoning. These different
categories are further explained below.
A locality’s zoning ordinance will also usually include
a textual section for each zoning district, laying out
a set of development standards that apply to land
development within that district. These development
standards regulate things like maximum structure
height, the distances that buildings must be set
back from property lines, and the permissible
development densities in a district, and they apply to
Given the substantial impacts of data centers, it
is not surprising that the rapid increase of these
facilities is generating significant concerns. Data
centers’ impact on many environmental issues,
including energy use, air pollution, climate change,
water consumption, and land development, are not
only felt locally, but are often statewide, national,
and even global in scale. Yet it is local elected
governing bodies — through their land use
and zoning authority — that are often the only
governmental entity that has a meaningful say on
whether, where, and even many aspects of how a data
center may be built.
To be sure, a data center proposal might trigger
various federal or state permitting requirements —
for example, if it would impact federally protected
wetlands or require a large surface water withdrawal.
However, developers can often design their proposals
to avoid such triggers, and even if they cannot,
the decisions on those permits are typically more
difficult to influence than a local governing body’s
zoning decision. Among other challenges, state and
federal permitting authorities are much further
removed from — and less responsive to — the
impacted community and its specific concerns than
the locally elected officials. In addition, a zoning
decision typically comes at a much earlier stage
of project development and before it has acquired
significant regulatory inertia, whereas any federal
and state permitting decisions usually occur after a
proposal has received the necessary local approval
— making it that much harder to convince state or
federal officials to demand significant improvements
or to reject the proposal outright. As a result,
even if the local zoning process is not always the
community’s only chance to influence a data center
proposal, it is usually its best opportunity.
It is therefore crucial for local officials and
communities that wish to influence data center
development to understand how their local land use
ordinances apply to data centers, and, if necessary, to
consider changes that could maximize transparent,
accountable, and informed decision-making.
SECTION 2
Addressing Data Centers in Local Zoning Ordinances
Page 29 of 221
5
all development allowed in that district regardless of
the specific land use.
In addition to these district-based development
standards, a zoning ordinance may include a set of
development requirements specific to particular
land uses, such as data centers. These use-specific
requirements, which often cover design and
operational aspects (for example, prohibitions on
data centers testing their backup generators during
nighttime hours), apply to any proposal for that
use regardless of the zoning district in which it is
proposed to be located, and they apply on top of
the district-specific development standards.
(Section 3 shares examples of some data center-
specific development requirements from various
Virginia localities.)
By-Right Uses
Each zoning district’s regulations typically list a set
of land uses that are allowed without any review by
the public or approval by local elected officials as
long as the proposal complies with the applicable
development standards for that zoning district
and that particular use. These uses are most often
referred to in Virginia as “by-right” or “permitted”
uses. This means that if a zoning district allows data
centers by right and a data center proposal meets
all applicable development standards and use-
specific requirements, then the local government
Determining Who Reviews
Special Use Permit Applications
In Virginia, it is often the locally elected
governing body (i.e., a City Council
or County Board of Supervisors) that
reviews and then votes to approve or
deny an application for a special use
permit. However, these decisions may
be delegated to a local zoning board
(in Virginia, called a Board of Zoning
Appeals or “BZA”) whose members are
appointed. Because these appointed
bodies are usually further removed from
local residents than the members of the
governing bodies (whom local residents
directly elect), the public may have a better
chance to impact decisions on special
use permits for data centers when these
decisions are the responsibility of the
governing body. Localities that have the
authority to choose between the governing
body or an appointed body like the BZA
should carefully consider which body they
want to review and decide on special use
permit applications for data centers.
©STEVE JONES
Page 30 of 221
6
has no ability to deny the proposal. Local elected
officials are unable to vote on it, and they may not
even be aware of it before it receives administrative
approval from the locality’s planning staff. And with
no local government decision required, there is no
requirement for a public hearing or other formal
opportunity for public input. In other words, if the
local planning staff confirms that the proposal meets
all the applicable development standards, then it is
allowed as a matter of right and there is no role for
the public or the elected officials.
Special Uses
Each zoning district’s regulations will often also list
a second set of uses that are allowed only with the
approval of a local governmental body. These uses
are generally referred to in Virginia as “special uses,”
“conditional uses,” or “special exceptions.”
Special uses are considered to have a potentially
greater impact on neighboring properties or
the public than uses permitted by right, so a
public review process and a decision by a local
governmental body is required before they may be
built. Although the features of the public review
process for a special use permit may vary by state and
locality, in Virginia they often include:
• Publication of notice of the proposal in a local
newspaper, including information about where
the public can view the application and related
materials;
• A public hearing before the locality’s planning
commission, and a recommendation from
the planning commission to the local
governmental body;
• A public hearing before the local body; and
• A public vote by the local body.
Further, the local body may be able to place
protective conditions (e.g., reasonable limitations
on the amount of water the proposal may use,
or requirements for additional noise reduction
equipment) on any special use permit it decides
to approve to help mitigate the proposal’s adverse
impacts. Such conditions must comply with
constitutional and any statutory parameters. (For
example, they must be both reasonably related
and roughly proportional to the impacts the public
body is seeking to address.) Significantly, however,
there is no requirement under Virginia law that the
conditions be agreed to by the applicant.
Pushing for strong protections via reasonable
conditions is an important way the public can
participate in the special use permit process to
lessen the negative impacts of data center proposals.
For inappropriately sited proposals whose impacts
cannot be adequately mitigated, members of the
public may also advocate that the local body simply
deny the special use permit request.
Rezonings
If a proposed land use is not included as either a
by-right use or a special use within a zoning district,
then it is most likely not allowed in that district.
However, it is important to check with the locality’s
planning staff, as some localities may interpret
data centers as a subset of some broader land use
(such as “Warehouse/Storage” or “Utility Facility”)
that is listed as either a by-right or special use in a
zoning district.
Once it is confirmed that a particular zoning district
does not allow data centers either by right or as a
special use, a developer seeking to build a data center
on property within that zoning district would need
to seek a “rezoning” of the property to a different
zoning district classification that does allow data
centers. Under Virginia law, the rezoning process
typically includes similar opportunities for public
engagement as those outlined above for special
use permits (e.g., public notice in local newspaper,
public hearing and recommendation from the
locality’s planning commission, and a public hearing
and vote by the governing body). In addition, the
governing body generally may seek “proffers” from
the applicant, which are voluntary conditions or
commitments the applicant offers to help mitigate
the potential impacts of the proposed development
on the surrounding community. However, because
Virginia law requires proffers to be voluntary on the
part of the applicant and imposes other restraints
on their use, the governing body’s authority is more
limited with proffers than it is with conditions on
special use permits.
In summary, both a special use permit and a
rezoning will typically require a public process with
at least one public hearing and a public vote by a
local governmental body. These processes provide
members of the public with a crucial opportunity to
obtain information on, engage with, and help shape
individual data center proposals in their community,
and in so doing, they promote more transparent,
Page 31 of 221
7
informed, and accountable decision-making. As a
result, if a locality wishes to allow data centers at
all, consideration should be given to these different
options for ensuring public review and approval
processes for data center proposals.
RESPONSIBLE DA T A CENTER
ZONING STRA TEGIES
Localities wishing to structure their zoning
ordinance to promote transparent, accountable, and
informed decision-making on data center proposals
should consider the following options:
• Amending the local zoning ordinance, if
necessary, to eliminate all by-right allowances
for data centers.
• Localities that wish to allow some level of data
center development should consider allowing
data centers only by special use permit, and only
in zoning districts intended for large-scale
industrial uses with major impacts (primarily
“heavy industrial” districts and possibly “light
industrial” districts).
• If a locality decides to allow some level of data
center development by right, it should consider
limiting the by-right allowance to data centers
under a certain size threshold (e.g., 40,000 square
feet) and/or to industrial zoning districts.
The key takeaway is that communities should
be proactive and get out in front of data center
development (or the next data center development)
in their locality. The first step is to figure out what the
zoning ordinance currently allows. Are data centers
allowed by right, and if so, where? Are those locations
and the scale of buildout allowed by right acceptable
to the community? If not, the locality should consider
options like those above that require a public review
process and the governing body’s approval before
a data center may be built. A locality that is not
deliberate about how its zoning ordinance addresses
data centers may sacrifice its residents’ best and only
opportunity to impact this industry’s development in
their communities.
Understanding the Zoning
Ordinance’s Definition of “Data
Center”
For localities that do want to allow some
level of data center development, it is
important to consider whether the zoning
ordinance’s definition of “data center” is
specific to the computer systems and their
directly associated components (such as
telecommunications, storage, and cooling
systems). If the definition is broad enough
that it can be read to cover gas turbines
or other fossil-fuel-based primary power
generation sources that an applicant may
wish to build on the same site to power
the data center, those uses might be
considered part of a data center that is
either allowed by right or approved as a
special use and thereby evade review by
the local governing body.
Page 32 of 221
8
Zoning ordinances that allow data centers either by
right or by special use permit often include a set of
use-specific development requirements that all data
centers must meet, regardless of the zoning district in
which they may be located. These requirements
are typically intended to reduce specific impacts
(e.g., water use or noise) and can take a variety of
forms. This section summarizes examples of data
center development requirements that Virginia
localities have adopted or proposed.
Please note that this section is intended to provide
a general sense of how some Virginia localities are
approaching the regulation of various data center
impacts, and inclusion of a provision below is not
intended as a blanket endorsement. Each locality that
wishes to allow some level of data center development
will want to consider its own specific development
requirements based on its unique context and the
impacts that are of concern to its residents.
Any ordinance provision that goes beyond what a
particular locality wishes to include in its zoning
ordinance as a mandatory development requirement
for all data centers could alternatively be considered
as a condition to attach to a special use permit or as a
proffer to include in a rezoning for an individual data
center proposal.
WA TER USE
In an effort to account for and address the heavy
strain that data centers can place on water resources,
some Virginia localities have adopted or proposed
provisions that require developers to provide
information about likely water use and to incorporate
design features that reduce water consumption. Some
of those provisions include:
• Requiring applicants seeking a special use permit
for data centers to disclose how much water a
facility is projected to use once fully developed and
operating.13
• Requiring connection to a public water system and
prohibiting use of wells for water supply.14
• Requiring special use permit applicants to submit
a letter from the public water utility indicating the
system has sufficient capacity to serve the proposed
data center.15
• Requiring that data centers use a closed-loop or
recycled water system.16
• A requirement limiting flushes and refills of
cooling system water to times approved by the local
water authority.17
ENERGY AND TRANSMISSION INFRASTRUCTURE
Data centers generally require vast amounts of
power and may also necessitate new transmission
infrastructure to connect to the source(s) of that
electricity. Some Virginia localities have adopted
or proposed provisions that require data center
developers to provide information to help the locality
assess and address these needs. Examples include:
• Requiring that special use permit applicants
provide information on how electricity would be
provided to serve the proposed data center.18
• Requiring an applicant for a special use permit for
a data center to submit a letter from the electric
utility indicating that the project would be able to
connect to a substation and transmission lines with
sufficient capacity and proximity.19
BACKUP GENERA TORS
Data centers typically have backup power sources
located onsite, and these often take the form of
commercial-scale diesel generators that emit
hazardous air pollutants and can generate significant
noise. Development requirements that Virginia
localities have adopted or proposed to try to reduce
these impacts include:
• Requiring onsite backup generators to meet or
exceed EPA Tier 4 emission standards.20
• Limiting routine generator testing or maintenance
to certain days and times.21
• Requiring that generators be located within sound-
limiting enclosures.22
SECTION 3
Data Center-specific Development Requirements
Page 33 of 221
9
LOCA TION AND COMPA TIBILITY
WITH OTHER LAND USES
Some Virginia localities have established
development standards in an effort to reduce the
disruptive impacts that data centers can have on
nearby land uses. These include:
• Requiring setbacks from adjoining property lines
and sensitive land uses.23
• Requiring vegetated buffers near sensitive features
and adjoining land uses.24
• Requiring mechanical equipment to be screened or
enclosed within a building.25
• Prohibiting data centers from locating within
a certain distance of transit stations to avoid
impeding transit-oriented development.26
NOISE
The persistent low-frequency noise that many data
centers emit can be a source of significant concern
for nearby schools, homes, and businesses. Some of
the development requirements that Virginia localities
have considered include:
• Prohibiting data centers (including generators
and other equipment) from emitting noise in
excess of certain thresholds during the daytime
and nighttime.27
• Requiring developers to conduct and submit
a noise study prior to site plan approval
demonstrating that the project will comply with the
locality’s noise limits.28
• Requiring developers to submit a post-construction
noise study demonstrating that the project
complies with noise limits.29
However, data center noise is a particularly difficult
impact to address effectively because it is the
constancy of the noise, not its volume, that is often
the source of neighbors’ frustration, and most noise
ordinances (like the examples referenced above)
focus on volume.
©SANJAY SUCHAK©SANJAY SUCHAK
Page 34 of 221
10
After a locality’s zoning ordinance is structured
to require public input and the governing body’s
review of some or all data center proposals, the
next question for local residents is how to engage
effectively when an individual data center is
proposed. The context around each local decision
on a data center proposal is unique. The impacts of
a particular proposal will depend on the project’s
location, size, and design, and different localities will
diverge in their balancing of costs against benefits.
Unfortunately, residents seeking a thoughtful and
informed decision on a data center proposal coming
before their local governing body often face serious
challenges. Many data center companies go to great
lengths to limit public disclosure of information they
deem as trade secrets or sensitive, and most have
substantial financial and staffing resources they can
bring to bear during local review processes. However,
there are some general steps that interested groups
and individuals can take to engage effectively. Here
are some suggestions:
Obtain a copy of the proposal and study it. As soon
as you learn about the proposal, visit or contact your
locality’s planning department and request a copy
of the application and all related documents. Go
through the documents carefully, and then follow up
with local planning staff to ask questions.
Know the rules of the process. There are rules that
govern how the public review processes for rezonings
and special use permits are intended to work. These
rules are meant to ensure the public has a reasonable
opportunity to learn about the proposal and then
provide their input to decision-makers before a vote.
For example, these processes often require public
hearings, and the locality or the applicant may be
required to post a notice of an upcoming hearing
in a public setting (e.g., in a local newspaper) a
certain number of days before the hearing takes
place. Similarly, a data center applicant may seek
to postpone a scheduled public hearing on their
proposal because they would like more time to lobby
the governing body, and the governing body may have
bylaws or its own specific rules and procedures that
govern how and when scheduled public hearings may
be removed from its meeting agendas. It is helpful to
be at least somewhat familiar with these rules to help
make sure the procedural requirements are being met
with such requests.
Create an online hub (such as a Facebook group)
for communicating information about the project
and for posting details on upcoming meetings and
public hearings.
Host a community information meeting to share
what you have learned about the proposal and to try
to get additional information.
• Consider inviting the applicant to attend the
meeting to present their project and answer
questions from attendees. They may decline,
but giving them the opportunity to explain the
proposal, listen to community members’ concerns,
and respond directly to residents’ questions
can provide helpful information and may open
avenues of communication that lead to meaningful
commitments to mitigate impacts.
• A community-organized meeting can have distinct
benefits in contrast to a meeting organized by the
applicant. Although applicant-hosted meetings
can be informative, the applicant sets the agenda.
They may steer the discussion toward the issues
they want to address and not necessarily toward
the community’s most pressing questions and
concerns.
“Public participation in the data
center discussion on a local
level is especially critical, given
that this is an industry still in its
adolescence, with virtually no
state-wide regulations.”
— Judge Leisa K. Ciaffone, Roanoke City
Circuit Court, Virginia.
(Gendreau v. McEvoy, 2025)30
SECTION 4
Tips for Effective Public Engagement
Page 35 of 221
11
• Remember that credibility is important in the
public review process. Always strive to verify a
factual, defensible basis for any information that
you share.
Broaden your reach. In addition to neighbors and
friends, reach out to businesses, schools, houses of
worship, and other groups and organizations that
could be negatively impacted by the proposal to make
sure they are aware of it and understand its potential
impacts. It will be beneficial to demonstrate to the
decision-making body that concerns are widespread
throughout the locality and are not limited to
residents in the immediate vicinity of the proposal.
Research the applicant and their past projects.
Because large data center companies frequently use
subsidiaries or shell companies when acquiring land
and applying for special use permits and rezonings,
the true identity of data center applicants may be
difficult to uncover during local reviews. However, it
is still worth researching the applicant’s history to
try to identify any other projects they have developed.
In particular, try to discover whether the applicant
has effectively mitigated the harmful impacts of
other projects, or if their projects have violated any
environmental provisions or damaged the hosting
communities’ quality of life. Similarly, it can be
useful to know whether the applicant company and
its executives are from the area, or if they reside
somewhere far from the community where they
are asking to build. Sharing factual information
with local officials about an applicant’s history
as a developer can be helpful context for local
officials, but keep in mind that making sweeping
or misleading statements about an applicant can
undercut your credibility and possibly even leave you
vulnerable to legal liability.
Help decision-makers understand the impacts.
Data center applicants will often provide detailed
estimates of the local tax revenue their projects might
generate, but they may not be as forthcoming with
information about the costs their projects could
impose on the community. Urge your local governing
body members to get answers to questions like the
ones below — and to make those answers available to
the public — before they consider voting.
Is the proposal consistent with the locality’s
comprehensive plan (sometimes referred to as a
“general plan” or “master plan”)?
• A comprehensive plan is a document that serves
as a “blueprint” for the long-range development
of land in the locality. In many states it is a key
guidance document for the local officials tasked
with deciding rezonings and special use permit
requests, and a proposal’s inconsistency with the
comprehensive plan can present a compelling
argument for denying it. For example, a data
center proposal would generally not be consistent
with a comprehensive plan’s designation of an
area for high-density residential or agriculture/
conservation.
• If the comprehensive plan includes provisions
that a community deems too permissive toward
data centers (either generally or in specific areas
of the locality that may be inappropriate for data
center development), advocacy efforts may need
to focus on amending the plan to remove or change
those provisions.
What valuable community and natural resources are
located on the site or nearby that would be damaged
or disrupted by the proposal?
• Data centers are often massive buildings that
require significant acreage and can generate
substantial amounts of pavement and noise. They
are often built in “campuses” with a dozen or more
buildings, along with all the other components
they include. When proposed in or near resources
such as public parks, forests, agricultural areas, and
historic buildings or landscapes, data centers can
inflict irreparable damage on these resources and
the many values they provide to the community.
What will be the primary source(s) of power for the
proposal, and will it require onsite power generation?
• A growing number of data center proposals are
seeking to provide their own onsite primary power
generation sources. Depending on the power source
proposed, this can present a host of additional
negative impacts — such as significant air pollution
from the burning of fossil fuels like methane gas
— that local governments should quantify and
understand before deciding on a proposal.
Will backup diesel generators be installed, and if so,
how many and what size and type will they be?
• Data centers predominantly rely on large-scale
diesel generators for backup energy, and larger data
center campuses can be equipped with hundreds of
them. These generators can be significant sources
Page 36 of 221
12
of hazardous air pollutants such as PM2.5 (see
Section 1), and they pose particularly concerning
health risks when located near schools, hospitals,
and other community resources where vulnerable
people spend time.
How much water will the proposal use, and what will
be the source of that water?
• Data centers can use a huge amount of water, and
they may pull it from the public water system,
withdraw it directly from local waterways, or extract
it from the ground. Each of these options poses risks
to public safety, environmental resources, or both.
It is crucial for local decision-makers to understand
how much water will be consumed and what effect
that will have on area aquifers, stream flows, and
public water supplies.
Would the data center, by itself or in combination
with other data centers, require new or
expanded electricity transmission lines or water
infrastructure?
• These secondary infrastructure projects are
often overlooked or ignored by local officials. It
is important to know what other infrastructure
projects may need to be built to serve the data
center and to assess what impacts those other
projects may have.
Promote strong turnout at public meetings.
Last but not least, ensure that the public hearings
on the proposal are heavily attended. It can be very
difficult for decision-makers to look out on a room full
of constituents who are all in agreement on an issue
and then vote the other way. Use visual cues such as
matching signs, shirts, or buttons to help the decision-
makers easily identify all the people in the room who
are on your side of the issue. This also helps give a
“voice” to any people who attend the hearing
but may not be comfortable providing their own
public comment.
Conclusion
Given the scale of the impacts and the explosive
growth of the data center industry, effective
leadership and engagement is needed from all
levels of government to ensure that development is
occurring in a way that protects communities, public
health, and the environment. Local governments
have a key role to play given their authority over
local land use, and it is essential that local zoning
ordinances promote meaningful public engagement
on data center proposals, require review and approval
from governing bodies, and establish protective
development requirements for any data centers that
are approved.
Community members also play a crucial part, and
by engaging effectively in the public review of data
center proposals, they contribute to the paramount
goals of transparent and informed decision-making.
Combining thoughtful zoning ordinances with
smart public involvement is one of the best strategies
currently available for shaping responsible data
center development, and it is one that all
localities confronting this growing challenge
should be pursuing.
Page 37 of 221
13
REFERENCES
1 Investing in the Rising Data Center Economy at 3, McKinsey & Company (Jan. 2023), https://www.mckinsey.com/~/media/mckinsey/industries/
technology%20media%20and%20telecommunications/high%20tech/our%20insights/investing%20in%20the%20rising%20data%20center%20economy/
investing-in-the-rising-data-center-economy_final.pdf
2 Nuoa Lei et al., The Water Use of Data Center Workloads: A Review and Assessment of Key Determinants, 219 Resources, Conservation and Recycling, 3-4
(2025), https://doi.org/10.1016/j.resconrec.2025.108310.
3 See How We Use Water, Environmental Protection Agency (Aug. 22, 2025) https://www.epa.gov/watersense/how-we-use-water (“The average American
family uses more than 300 gallons of water per day at home.”).
4 Dashveenjit Kaur, Cloud’s Hidden Cost: Data Centre Water Consumption Creates a Global Crisis, Cloud Computing (July 15, 2025), https://www.
cloudcomputing-news.net/news/data-centre-water-consumption-crisis/#:~:text=Hyperscale%20facilities%20operated%20by%20companies%20like%20
Google,gallons%20(760%20million%20litres)%20annually%20per%20facility; see also Mary Zhang, Data Center Water Usage: A Comprehensive Guide, Dgtl
Infra (Ja. 17, 2024) https://dgtlinfra.com/data-center-water-usage/
5 See David Mytton, Data Centre Water Consumption, npj Clean Water, 1-6 (2021). https://doi.org/10.1038/s41545-021-00101-w; see also Nuoa Lei et al.,
The Water Use of Data Center Workloads: A Review and Assessment of Key Determinants, 219 Resources, Conservation and Recycling, 2 (2025), https://doi.
org/10.1016/j.resconrec.2025.108310.
6 Electricity: Information on Peak Demand Power Plants at 5, U.S. Government Accountability Office (2024) (hereafter referred to as “GAO Report”); Xiaopeng
Liu et al., Association Between Residential Proximity to Fuel-Fired Power Plants and Hospitalization Rate for Respiratory Diseases, 120 Environmental
Health Perspectives 807, 807 (2012), https://doi.org/10.1289/ehp.1104146.
7 GAO Report at 6.
8 Xiaopeng Liu et al., Association Between Residential Proximity to Fuel-Fired Power Plants and Hospitalization Rate for Respiratory Diseases, 120
Environmental Health Perspectives 807, 807 (2012), https://doi.org/10.1289/ehp.1104146.
9 Report: Balico Proposal Impact Analysis (April 12, 2025), https://www.selc.org/resource/publichealthimpacts-analysis-balico-gas-plant-report/.
10 Colleen Kelleher, Massive PW Digital Gateway Data Center Plan Approved in Prince William County, Northern Virginia Magazine (Dec. 14, 2023), https://
northernvirginiamag.com/news/2023/12/14/massive-pw-digital-gateway-data-center-plan-approved-in-prince-william-county/
11 Theo Burman, Map Shows States with the Most Data Centers as Electricity Bills Rise, Newsweek (Aug. 30, 2025), https://www.newsweek.com/map-data-
centers-us-electricity-bills-2120645.
12 Report to the Governor and the General Assembly of Virginia: Data Centers in Virginia at 5, Joint Legislative Audit and Review Commission (Dec. 2024),
https://jlarc.virginia.gov/pdfs/reports/Rpt598.pdf
13 York County Zoning Ordinance at § 24.1-489.1(a)(2).
14 York County Zoning Ordinance at § 24.1-489.1(b).
15 York County Zoning Ordinance at § 24.1-489.1(a)(2).
16 Albemarle County Zoning Ordinance at § 18-5.1.65(B)(2).
17 Albemarle County July 2025 Draft Ordinance Amendment at § 18-5.1.65(B)(3).
18 Albemarle County July 2025 Draft Ordinance Amendment at § 18-5.1.65(I).
19 York County Zoning Ordinance at § 24.1-489.1(a)(1).
20 Albemarle County July 2025 Draft Ordinance Amendment at § 18-5.1.65(D)(3).
21 Loudoun County Zoning Ordinance at § 4.06.02(D)(8))a-b); Albemarle County Zoning Ordinance at §.18-5.1.65(D)(1).
22 Albemarle County Zoning Ordinance at § 18-5.1.65(D)(2).
23 Albemarle County Zoning Ordinance at § 18-5.1.65(C).
24 Loudoun County Zoning Ordinance at § 4.06.02(D)(11).
25 Henrico County Zoning Ordinance at § 24-4328(B); Loudoun County Zoning Ordinance at§4.06.02(D)(2).
26 Fairfax County Zoning Ordinance at § 4102.6(A)(5).
27 Albemarle County July 2025 Draft Ordinance Amendment at § 18-5.1.65(G)(1).
28 Fairfax County Zoning Ordinance at § 4102.6(A)(6).
29 Fairfax County Zoning Ordinance at § 4102.6(A)(6).
30 Henri Gendreau v. Mike McEvoy, Va. Cir., CL25-2187 (2025)
Page 38 of 221
Page 39 of 221
Using a Development
Moratorium Correctly
South Carolina is growing fast. In some parts of the state, residents may
feel that growth is happening far too quickly. That perception has led
some municipalities to impose moratoria on at least some types of new
construction. Although imposing a moratorium is a useful tool to pause
the pressures of new development, there are guidelines that councils
should follow in imposing them.
The most important rule is that a municipal council may impose a
development moratorium only by ordinance. This rule arose from
Simpkins v. City of Gaffney, a case in which the city council passed a
motion placing a city-wide moratorium on the issuance of building
permits or construction of duplexes and multifamily dwellings. The
court reasoned that because the development rights arose under the
city's zoning ordinance, the moratorium was effectively a suspension or
an amendment of that ordinance. Under the so-called equal dignity
Page 40 of 221
rule, an ordinance may be suspended or amended only by a new
ordinance.
Implicit in the Simpkins rule is the idea that a moratorium is supposed
to allow council time to consider amendments or updates to the
underlying zoning ordinance, not simply to stop development. Although
the South Carolina courts have never explicitly established criteria for a
valid moratorium, a leading case from Minnesota provides that a
moratorium is valid if:
it is for the purpose of researching and implementing changes to
the zoning ordinance or comprehensive plan,
it is of limited duration, and
the government acts promptly to research and implement such
changes.
The best practices that have evolved in South Carolina are consistent
with these guidelines. First, in announcing a moratorium, the council
should specify that the purpose of the moratorium is to research and
implement amendments to its zoning ordinance or comprehensive
plan. The council should not simply declare a moratorium without also
detailing what it intends to do during the pause.
Second, the moratorium should be of limited duration. There appears
to be no strict limitation on what is a reasonable time period, but the
consensus among practitioners is that six months is a presumptively
reasonable length for a moratorium. Some ordinances also have
included the ability for council to extend the moratorium a single time,
by resolution, for no more than an additional three months. A longer
period might be upheld, but clearly an indefinite or excessively
prolonged moratorium would be invalid.
Third, once the council imposes a moratorium, it should promptly begin
to research and implement the desired amendments to the zoning
ordinance. If a frustrated developer were to challenge a moratorium, it
seems likely that a court would not look kindly on a municipality that
simply sat on its hands during the pause in development activity.
One question that frequently arises is whether, under the equal dignity
rule, the council must follow the notice and public hearing
requirements that apply to the actual amendments to the zoning
ordinance. Neither the South Carolina courts nor the South Carolina
Page 41 of 221
Uptown April 2020
Attorney General have addressed this question. The better
interpretation, however, seems to be that the municipality is not
required under state law to provide notice or public hearings before
imposing a development moratorium. On the other hand, if the
municipality determines during the moratorium to go forward with
amendments to its zoning ordinance or comprehensive plan, then
those amendments would be subject to the ordinary notice and public
hearing requirements.
Page 42 of 221
BEAUFORT COUNTY
NATURAL RESOURCES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE AN ELECTRIC LINE EASEMENT
WITH DOMINION ENERGY ON THE PROPERTY KNOWN AS POCOTALIGO PRESERVE (TMS R710 012 000 0001
0000 AND R710 012 000 0072 0000).
MEETING NAME AND DATE:
Natural Resources Committee September 8, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval. If the Natural Resources Committee recommends approval, then move forward
with three ordinance readings and a public hearing at County Council.
PRESENTER INFORMATION:
Dylan Kidd, Interim Assistant County Administrator, 5 minutes
ITEM BACKGROUND:
Beaufort County owns in fee-simple the property known as Pocotaligo Preserve located at 30 Cotton Hall Road
in Yemassee, SC. Dominion Energy owns an overhead electric line that runs through various open fields on the
property, which is negatively impacted by County-initiated land management activities. Due to the length of
time the original easement agreement was executed by prior property owners, and the desire by both the
County and Dominion to relocate the electric line to a more suitable location along the property access road,
the execution of a new easement agreement is recommended.
FISCAL IMPACT:
There is no fiscal impact. Dominion will fully fund the relocation of the electrical line.
APPROVAL HISTORY:
This is a new item
Page 43 of 221
ORDINANCE 2026/____
AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE
AN ELECTRIC LINE EASEMENT WITH DOMINION ENERGY ON THE PROPERTY
KNOWN AS POCOTALIGO PRESERVE (TMS R710 012 000 0001 0000 and R710 012
000 0072 0000)
WHEREAS, Beaufort County (“County”) owns in fee-simple the property known as Pocotaligo
Preserve (“Property”) with TMS numbers R710 012 000 0001 0000 and R710 012 000 0072
0000; and
WHEREAS, Dominion Energy (“Dominion”) owns an overhead electric line currently
traversing through multiple open fields on the Property; and
WHEREAS, the County and Dominion desire to formalize the use of the Property with an
electric line easement and relocate the electric line from its current location to a more suitable
location along the Property access road.
NOW, THEREFORE be it ordained that Beaufort County Council duly assembled, does hereby
authorize the County Administrator to execute an electric line easement with Dominion Energy
on the property known as Pocotaligo Preserve (TMS R710 012 000 0001 0000 and R710 012
000 0072 0000).
ORDAINED this ____ day of ____________, 2026
COUNTY COUNCIL OF BEAUFORT COUNTY
BY: ___________________________________
Alice Howard, Chairman
ATTEST:
___________________________
Sarah W. Brock, JD, Clerk to Council
Page 44 of 221
RW-4-E-SC (Rev. 4-2019)
Easement # 908057
INDENTURE, made this _________ day of ____________________, 2026 by and between Beaufort County of the State of South
Carolina, hereinafter called “Grantor” (whether singular or plural), and the DOMINION ENERGY SOUTH CAROLINA, INC., a
South Carolina corporation, having its principal office in Cayce, South Carolina, hereinafter called “Grantee”.
WITNESSETH:
That, in consideration of the sum of One Dollar ($1.00) received from Grantee, Grantor, being the owner of land situate in th e
County of Beaufort, State of South Carolina, hereby grants and conveys to Grantee, its successors and assigns, the right to construct,
extend, replace, relocate, perpetually maintain and operate an overhead or underground electric line or lines consisting of a ny or all of
the following: poles, conductors, lightning protective wires, municipal, public or private communication lines, cables, condu its, pad
mounted transformers, guys, push braces and other accessory apparatus and equipment deemed by Grantee to be necessary or
desirable, upon, over, across, through and under land described as follows: a tract or lot of land containing 527.1700 acres, more or
less, and being the same lands conveyed to Grantor by deed of Open Space Institute Land Trust, Inc., dated or recorded
10/20/2023, and filed in the Register of Deeds office for Beaufort County in Deed book 4284 at Page 1424.
All those certain pieces, parcels, or tracts of land, situate, lying and being in Beaufort County, South Carolina, containing
232.18 Acres known and designated as "Duveaux Hill Parcel A" and 294.99 Acres known and designated as "Parcel C" and
being more fully described and shown as plat entitled "This Plat is Prepared at the Request of the Tomotley Crew, LLC A
Division of Tax Map #R710 012 000 001 0000, Sheldon Area, Beaufo rt County, South Carolina" on that certain plat recorded
in Plat Book 161 at Page 136.
The easement is for the electric facilities more fully shown on Dominion Energy drawing # 86320 and any revisions made
thereof and is made a part hereof by reference only. This easement supersedes and replaces the previous easement granted by
The Tomotley Crew, LLC recorded October 4, 2022, and recorded in the Beaufort County Register of Deeds in Deed Book
4187 page 263. A signed Dominion Energy drawing by the Grantor will be authorization for the Grantee to install future
facilities within the limits of the property shown on the above-mentioned plat.
TMS: R710 012 000 0001 0000 and R710 012 000 0072 0000
Together with the right from time to time to install on said line such additional lines, apparatus and equipment as Grantee m ay deem
necessary or desirable and the right to remove said line or any part thereof.
Together also with the right (but not the obligation) from time to time to trim, cut or remove trees, underbrush and other ob structions
that are within, over, under or through a strip of land (“Easement Space”) extending Fifteen (15) feet on each side of any pole lines
and Five (5) feet on each side of any underground wires and within, over, under or through a section of land extending Twelve (12)
feet from the door side(s) of any pad mounted transformers, elbow cabinets, switchgears or other devices as th ey are installed;
provided, however, any damage to the property of Grantor (other than that caused by trimming, cutting or removing) caused by
Grantee in maintaining or repairing said lines, shall be borne by Grantee; provided further, however, that Granto rs agree for
themselves, their successors and assigns, not to build or allow any structure to be placed on the premises in such a manner t hat any
part thereof will exist within the applicable above specified Easement Space, and in case such structure is bu ilt, then Grantor, or such
successors and assigns as may be in possession and control of the premises at the time, will promptly remove the same upon de mand
of Grantee herein. Grantor further agrees to maintain minimum ground coverage of thirty six (36) inches and maximum ground
coverage of fifty four (54) inches over all underground primary electric lines. Together also with the right of entry upon said lands
of Grantor for all of the purposes aforesaid.
The words “Grantor” and “Grantee” shall include their heirs, executors, administrators, successors and assigns, as the case m ay be.
IN WITNESS WHEREOF, Grantor has caused this indenture to be duly executed the day and year first above written.
WITNESS:
[SIGNATURES TO FOLLOW
Page 45 of 221
RW-4-E-SC (Rev. 4-2019)
Easement # 908057
Beaufort County
______________________________________________________________ By: ________________________________________________________
1st Witness
______________________________________________________________ ____________________________________________________________
2nd Witness Print Name
___________________________________________________________
Title
ACKNOWLEDGMENT
STATE OF SOUTH CAROLINA )
)
COUNTY OF Beaufort )
The foregoing instrument was acknowledged before me, the undersigned Notary, and I do hereby certify that the within named o f
Beaufort County personally appeared before me this day and that the above named acknowledged the due execution of the foregoing
instrument.
Sworn to before me this ______ day of ____________, 2026
_________________________________
Signature of Notary Public State of SC
My commission expires: ___________
________________________________
Print Name of Notary Public
RIGHT OF WAY GRANT TO
DOMINION ENERGY SOUTH CAROLINA, INC.
Line: COTTON HALL TIE LINE
County: Beaufort
R/W File Number: 29059
Grantor(s): Beaufort County
Return to: DESC C/O Right of Way Dept., 81 May River Road, Bluffton, SC 29910
Page 46 of 221
RW-4-E-SC (Rev. 4-2019)
Page 47 of 221
TRASK PKWY.(US HWY 21)
COTTON HALL RD.
STONEY CREEK CEMETARY RD.
TRASK PKWY.(US HWY 21)
NO DATEBYREVISIONFORDRNSHEET OF SHEETS
TITLEDETAILSCALE:SUB.APPDIST#CKT# DOMINION ENERGY SOUTH CAROLINA, INC.
SCALE:
DEVELOPER'S SIGNATURE BLOCK
3 DAYS BEFORE DIGGINGIN SOUTH CAROLINACALL 811IT'S THE LAWPALMETTO UTILITY PROTECTION SERVICE
EASEMENT NO.FILE NUMBERR/W AGENTRIGHT OF WAY INFORMATION
W.R.#STARTED COMPLETEDCLOSED OUTW.O.#
GAS ENG.-TECH.ELECTRIC ENG.-TECH.COORDINATORBY:BY:BY:
DOMINION ENERGY SOUTH CAROLINA, INC.ELECTRIC DISTRIBUTION SYMBOLS
PRELIMINARY
Page 48 of 221
BEAUFORT COUNTY
NATURAL RESOURCES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO ENTER INTO A LICENSE AGREEMENT WITH
THE STATE OF SOUTH CAROLINA FOR THE REPAIR OF A “FLYWHEEL” ARTIFACT TO BE INSTALLED AND
DISPLAYED AT FORT FREMONT PRESERVE.
MEETING NAME AND DATE:
Natural Resources Committee September 8, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of the Resolution. If approved by the Natural Resource Committee, then it will go
to County Council on September 28, 2026.
PRESENTER INFORMATION:
Dylan Kidd, Interim ACA Development (5 minutes)
ITEM BACKGROUND:
Beaufort County owns several parcels of land collectively known as Fort Fremont Preserve located at 1124
Lands End Road, St. Helena Island, SC, which is a Spanish-American War era fort ruin. The County and the
Friends of Fort Fremont have entered into a Memorandum of Understanding dated April 8, 2019, which allows
the Friends to provide interpretive displays, services, assistance, and activities as approved by the County. The
Friends recovered a War era “Flywheel” artifact between the high and low tide lines on the beach adjacent to
Fort Fremont and want to clean, repair, display, and interpret the artifact on Fort Fremont. The State of South
Carolina is the ultimate owner of the artifact due to its found location and agrees to license the artifact to the
County and the Friends. The Friends are going to conduct and fund all cleaning and repairs to the artifact,
therefore there is no cost to the County.
FISCAL IMPACT:
There is no fiscal impact to the County.
APPROVAL HISTORY:
This is a new item for approval.
Page 49 of 221
RESOLUTION 2026/____
A RESOLUTION AUTHORIZING THE COUNTY ADMINISTRATOR TO ENTER
INTO A LICENSE AGREEMENT WITH THE STATE OF SOUTH CAROLINA FOR
THE REPAIR OF A “FLYWHEEL” ARTIFACT TO BE INSTALLED AND
DISPLAYED AT FORT FREMONT PRESERVE
WHEREAS, Beaufort County (“County”) owns several parcels of land collectively known
as Fort Fremont Preserve (“Property”) located at 1124 Lands End Road, St. Helena Island, SC,
which is a Spanish-American War era fort ruin; and
WHEREAS, the County and the Friends of Fort Fremont (“Friends”) have entered into a
Memorandum of Understanding dated April 8, 2019, which allows the Friends to provide
interpretive displays, services, assistance, and activities as approved by the County; and
WHEREAS, the Friends recovered a War era “Flywheel” artifact between the high and
low tide lines on the beach adjacent to the Property; and
WHEREAS, the State of South Carolina (“State”) is the ultimate owner of the artifact and
agrees to license the artifact to the County, which will be cleaned, repaired, painted, installed and
interpreted on the Property by the Friends; and
WHEREAS, the County agrees to accept the artifact to be installed and displayed on the
Property, until such time as the State requests its return.
NOW, THEREFORE, BE IT RESOLVED by Beaufort County Council, duly
assembled, does hereby authorize the County Administrator to enter into a license agreement with
the State of South Carolina for a “Flywheel” artifact to be installed and displayed at Fort Fremont
Preserve.
Adopted this ______ day of ____________, 2026.
COUNTY COUNCIL OF BEAUFORT COUNTY
By: _______________________________
Alic Howard, Chairwoman
ATTEST:
_______________________________
Sarah Brock, Clerk to Council
Page 50 of 221
Admin – Beaufort County Artifact
Beaufort/Admin License Agreement
1
STATE OF SOUTH CAROLINA )
) LICENSE AGREEMENT
COUNTY OF RICHLAND )
The State of South Carolina, by and through the Department of Administration, an agency,
institution, department (including any division or bureau thereof) or political subdivision of the
State of South Carolina, as custodian of the property described below, (hereinafter referred to as
“Licensor”), hereby grants to the Beaufort County, (hereinafter referred to as “Licensee”), a
temporary, revocable, non-transferable and non-exclusive license to use the property identified
and conditioned below. This License shall first be effective on the date that the Department of
Administration executes this License pursuant to S.C. Code Ann. Section 54-7-650(F) as set
forth on the signature page (“Effective Date”).
THIS LICENSE, as conditioned herein, is granted based upon the consideration provided to
Licensor through Licensee’s commitments expressed herein.
1. DESCRIPTION OF PROPERTY. The property to be used by the Licensee is a set of
iron wheels (2 ft in diameter) attached to an iron axle, a picture of which is attached hereto as
Exhibit A, found on the beach at Fort Fremont in Beaufort County, South Carolina in the public
area between low and high tide and believed to be the remains of one of the carts used by the
Army as part of a tram system to move supplies and items to and from the pier (herein “Iron
Wheels”). Licensee also seeks permission to restore and care for a flywheel (2 ft in diameter and
6 inches thick), a picture of which is attached hereto as Exhibit B, found on the beach at Fort
Fremont in Beaufort County, South Carolina in the public area between low and high tide and
believed to be a part of the Fort’s sewer pumping system (herein the “Flywheel”).Collectively,
the Iron Wheels and Flywheel shall be referred to as the “Property”. Licensor is custodian of the
Property pursuant to SC Code Section 54-7-640(C).
2. AUTHORIZED USE OF PROPERTY. Licensee has requested permission from
Licensor and Licensor hereby grants permission to Licensee to curate and display the Property at
the Fort Fremont Preserve located at 1124 Lands End Road, St. Helena Island, South Carolina
(herein “Fort Fremont Preserve”) in accordance with Licensee’s Agreement for Volunteer
Services on Public Property dated June 3, 2024 with the Friends of Fort Fremont Historical Park,
Inc (“Friends”), which allows the Friends to provide interpretive displays, services, assistance,
and activities as approved by Licensee. Licensee has also requested Permission from Licensor to
care for and/or restore the Property. In providing this limited authorization, Licensee may: a)
utilize the Property solely for these stated purposes, b) conduct such repair and restoration
activities upon the Property as necessary to construct a replica tram for display at Fort Fremont
Preserve, all at no cost or expense to Licensor; and c) properly care for and restore the Property,
including cleaning the Property, during the term of this License. At all times, Licensee must use
reasonable care to protect the Property. Licensee may not deaccession or dispose of the Property
without the approval of Licensor.
3. TERM. Unless otherwise terminated by Licensor, this License is granted for the
term which begins on the Effective Date and ends on December 31, 2036.
Page 51 of 221
Admin – Beaufort County Artifact
Beaufort/Admin License Agreement
2
4. NOTICES. All notices to be given pursuant to this License shall be addressed, if to
Licensor: SC Department of Administration, Attn: Real Property Services, 1200 Senate Street,
Columbia SC 29201, and if to the Licensee: Beaufort County, Attn: Stefanie M. Nagid, Director,
Land Preservation Department, 124 Lady’s Island Drive, Beaufort SC 29907, or as may from
time to time otherwise be directed by the parties. Notice shall be deemed to have been duly given
when properly posted with the United States Postal Service.
5. AUTHORIZED REPRESENTATIVES INCLUDED. Except as otherwise
specifically provided, any reference herein to “Licensor” shall include its duly authorized
representatives. Except as otherwise specifically provided, any reference to “Licensee” is limited
to Beaufort County through its duly authorized representatives, including its employees, invitees,
volunteers, agents, and contractors acting in accord with this Agreement. Additionally, the
Friends, as contractors of Licensee acting under this License, must first subscribe to and be bound
by the terms and conditions of this License.
6. APPLICABLE LAWS, REGULATIONS AND CONDITIONS. The Licensee
shall be bound by the following:
a. The Licensee shall comply with all applicable federal, state, county and municipal laws,
ordinances and regulations wherein the Property is located.
b. This License is only valid for the use of the specified Property and does not provide for
the special use of other State or Licensor property, buildings, or facilities.
c. This License is subject to the dominant rights of Licensor to improve, use, and maintain
the Property. Licensor retains the right for itself, its contractors, officers, employees,
agents, and/or invitees to use the Property.
d. The exercise of the privileges herein granted to Licensee shall be without cost or expense
to the Licensor.
e. This License may not be assigned by Licensee without prior written approval of Licensor
and Admin.
7. CONDITION OF THE PROPERTY. The Licensee acknowledges that s/he has
inspected the Property, knows its condition, and understands that access and use of the Property
is granted without any representation or warranties whatsoever and without any obligation on the
part of the State or Licensor.
8. PROTECTION AND RESTORATION OF PROPERTY. Licensee may
undertake cleaning and restoration of the Property pursuant to the terms set forth herein. Further,
Licensee shall be responsible for cleaning and maintaining the Property during the term of this
License. Licensee shall be responsible for damage to the Property related to or caused by the
activities of Licensee (or anyone acting on behalf of or under Licensee). All such repair and/or
restoration shall be done promptly, at Licensee’s sole cost and at no cost or expense to the
Licensor or the State and shall be subject to the satisfaction of Licensor. Additionally, the
Licensee shall exercise due diligence in the protection of the State’s and Licensor’s Property
against fire or damage from any and all other causes and shall be responsible for any damage that
may be caused to the Property of the State or Licensor by the acts or omissions of the Licensee
Page 52 of 221
Admin – Beaufort County Artifact
Beaufort/Admin License Agreement
3
(or anyone acting on behalf of or under Licensee) under this License. Any such damage shall be
promptly repaired by Licensee at Licensee’s sole cost and expense and to a condition satisfactory
to Licensor.
9. SUSPENSION AND TERMINATION. This License may be suspended temporarily
by Licensor in order to conduct Licensor activities on the Property, for public necessity, or to
ensure that the condition of the Property is not unduly damaged. This License may be terminated
at will by Licensor at any time by delivery of thirty (30) days written or in-person verbal notice
to Licensee by Licensor. Upon termination or expiration of this License, the Licensee will return
the Property to Licensor in good condition at Licensee’s sole cost and expense.
10. ACKNOWLEDGEMENT AND RELEASE. This License is effective only insofar
as the rights of the State of South Carolina, including Licensor, in the Property are concerned,
and the Licensee shall obtain any permit or license which may be required by federal, state, or
local statute in connection with the use of the Property.
11. INSURANCE. Licensee shall have and maintain insurance coverage during the
term of this License which shall cover the Property.
12. COMPLETE AGREEMENT. This License contains the entire agreement between
the parties and any agreement hereafter made shall be ineffective to change, modify, or discharge
it in whole or in part, unless such agreement is in writing and signed by all parties.
13. GOVERNING LAW. This License shall be governed by and construed pursuant
to the laws of the state of South Carolina.
(Signature Page Follows)
Page 53 of 221
Admin – Beaufort County Artifact
Beaufort/Admin License Agreement
4
Licensor and Licensee hereby agree to be bound by these terms and have executed this License
Agreement this _____ day of ____________, 20 .
LICENSOR: Department of Administration
BY: _____________________________
Name:
Title:
LICENSEE: Beaufort County
BY:______________________________
Name:
Title:
As a Contractor of Licensee selected to conduct certain activities and provide certain services
under the authority of this License, I agree to comply with and be bound by the terms of this
License Agreement.
Contractor Licensee:
Name: Friends of Fort Fremont Historical Park, Inc.
By: (signature)
(signatory printed name)
Title:
Address:
Phone:
Date: ____________________________________
Page 54 of 221
Admin – Beaufort County Artifact
Beaufort/Admin License Agreement
5
Exhibit A
Page 55 of 221
Admin – Beaufort County Artifact
Beaufort/Admin License Agreement
6
Page 56 of 221
BEAUFORT COUNTY
NATURAL RESOURCES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
AN ORDINANCE AMENDING THE BEAUFORT COUNTY CODE OF ORDINANCES, CHAPTER74 - BUILDING AND
BUILDING REGULATIONS, SECTION 74-64, ADOPTION OF BUILDING CODES (AMENDS CODE OF ORDINANCES
TO ADOPT THE 2024 STATE MANDATED CODE EDITONS).
MEETING NAME AND DATE:
Natural Resources Committee September 8, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval.
Motion to approve/deny — AN ORDINANCE AMENDING THE BEAUFORT COUNTY CODE OF ORDINANCES,
CHAPTER 74 - BUILDING AND BUILDING REGULATIONS, SECTION 74-64, ADOPTION OF BUILDING CODES
(AMENDS CODE OF ORDINANCES TO ADOPT THE 2024 STATE MANDATED CODE EDITIONS)
Move forward to Council for First Reading
PRESENTER INFORMATION:
Michael Brantley, Director Building Services, 5 minutes
ITEM BACKGROUND:
On August 26, 2025, the South Carolina Building Codes Council (the "Council") adopted the latest editions of
the mandatory code and appendices with modifications, as referenced in S.C. Code Ann. §6-9-50 (1976, as
amended), to be enforced by all municipalities and counties in South Carolina. The Council established the
implementation date for local jurisdictions as January 1, 2027. Local adoption of the latest state mandated
code editions is required by state law.
FISCAL IMPACT:
No Fiscal Impact
APPROVAL HISTORY:
Page 57 of 221
'-" South Carolina
N Building Codes
0 Modifications
N Index
Page 58 of 221
Introduction to 2024 Building Codes Modifications Index
On August 26, 2025, the South Carolina Building Codes Council (the “Council”) adopted the latest editions of the
mandatory codes and select appendices with modifications, as referenced in S.C. Code Ann. §6 -9-50 (1976, as
amended), to be enforced by all municipalities and counties in South Carolina. More specifically, t he Council
modified and adopted the building codes listed below for use in the State of South Carolina:
2024 Edition of the International Building Code1
2024 Edition of the International Residential Code2
2024 Edition of the International Fire Code3
2024 Edition of the International Plumbing Code4
2024 Edition of the International Mechanical Code5
2024 Edition of the International Fuel Gas Code6
2023 Edition of the National Electrical Code
The Council established the implementation date for local jurisdictions as January 1, 2027.
The Modifications Index lists all modifications that apply to the mandatory building codes listed above, as well as
any appendices adopted by the Council . The modifications are arranged by the affected code section numbers in
ascending order. Modifications continued from a prior building code cycle were renumbered to coincide with the
2024 building code cycle numbering, and are distinguished by a note and reference to their prior modification
numbers. Strikethrough indicates the language deleted by a modification and an underline indicates language
added.
The latest edition of the permissive codes referenced in S.C. Code Ann. § 6-9-60 (1976, as amended) may be adopted
by municipalities and counties via ordinance, and this local adoption by ordinance must take place before
enforcement can begin. The permissive codes are the latest editions of the International Property Maintenance
Code, International Existing Building Code, International Performance Code, and International Swimming Pool and
Spa Code.
Adoption of the mandatory codes and permissive codes does not include the chapters, sections or provisions
addressing administrative policies or procedures. Administrative policies and procedures are the sole responsibility
of each local jurisdiction. If the governing body of a local jurisdiction desires to use the administrative provisions in
one or more of the adopted codes, it must first adopt the chapters or sections by ordinance. In lieu of adopting the
administrative provisions contained in the adopted codes, the governing body of a local jurisdiction may develop
specific administrative policies and procedures for the operation o f its Building Inspection Department by
ordinance.
The latest edition of ICC/ANSI A117.1, Accessible and Usable Buildings and Facilities, is adopted by statute (S.C.
Code Ann. § 10-5-210 et seq.), and is mandatory for use in all municipalities and counties within the State.
1 As modified, known as the 2024 South Carolina Building Code
2 As modified, known as the 2024 South Carolina Residential Code
3 As modified, known as the 2024 South Carolina Fire Code
4 As modified, known as the 2024 South Carolina Plumbing Code
5 As modified, known as the 2024 South Carolina Mechanical Code
6 As modified, known as the 2024 South Carolina Fuel Gas Code
1
2024 Building Code Modification Index (11/3/2025 V.1)
Page 59 of 221
The South Carolina Legislature has enacted the Energy Standard Act (S.C. Code Ann. § 6-10-10 et seq.), and pursuant
to the Energy Standard Act, the 2009 edition of the Inte rnational Energy Conservation Code has been statutorily
adopted as the energy standard and is mandatory for use in all jurisdictions within the State.
Additional information about the building codes adoption process can be found on the South Carolina Building
Codes Council’s website.
2
2024 Building Code Modification Index (11/3/2025 V.1)
Page 60 of 221
2024 SOUTH CAROLINA BUILDING CODES MODIFICATIONS INDEX
Index # Code Modifications New/Continuation
2024 INTERNATIONAL BUILDING CODE (IBC)
IBC 2024 01 [A] 101.4.7 Existing buildings Continuation
IBC 2024 02 202 Definitions – Vapor retarder, ground contact & Primitive
camp structure
Continuation
IBC 2024 03 303.4 Assembly Group A-3
(IFC 2024 03)
Continuation
IBC 2024 04 312.1 General Continuation
IBC 2024 05 706.1 General Continuation
IBC 2024 06 1010.2.13 Controlled egress doors in Group I-1, I-2 and I-4
(Adult Day Care Occupancy only)
(IFC 2024 16)
Continuation
IBC 2024 07 1016.2 Egress through intervening spaces
(IFC 2024 17)
Continuation
IBC 2024 08 1803.2 Investigation required Continuation
IBC 2024 09 1907.4 Vapor retarder Continuation
IBC 2024 10 2303.2.3 Other means during manufacture Continuation
IBC 2024 11 [P] 2902.1.1 Fixture calculations
(IPC 2024 11)
Continuation
IBC 2024 12 [P] 2902.2 Separate facilities
(IPC 2024 12)
Continuation
IBC 2024 13 Appendix H Signs Continuation
2024 INTERNATIONAL RESIDENTIAL CODE (IRC)
IRC 2024 01 R202 Definitions – Accepted Engineering Practice Continuation
IRC 2024 02 R202 Definitions – Crawl Space Continuation
IRC 2024 03 R202 Definitions – Sleeping Loft New from HBA of SC
IRC 2024 04 R301.2.1 Wind design criteria Continuation
IRC 2024 05 R301.2.2 Seismic provisions New from HBA of SC
IRC 2024 06 R301.2.2.1 Determination of seismic design category Continuation
IRC 2024 07 R302.1 Exterior Walls (adds exception #6) Continuation
IRC 2024 08 R302.1 Exterior Walls (adds exception #7) Continuation
IRC 2024 09 R302.2.7 Meter Location New from HBA of SC
IRC 2024 10 R302.4.1 Through penetrations Continuation
IRC 2024 11 R302.5.1 Opening protection Continuation
IRC 2024 12 R302.13 Fire protection of floors Continuation
IRC 2024 13 R304.1.1 Field treatment Continuation
IRC 2024 14 305.1 Subterranean termite control methods Continuation
IRC 2024 15 R305.4 Foam Plastic Protection Continuation
IRC 2024 16 R305.5 Termite inspection strip Continuation
IRC 2024 17 R309 Automatic Sprinkler Systems Continuation
IRC 2024 03 R310.3 Location New from HBA of SC
IRC 2024 03 R314.1 General New from HBA of SC
3
2024 Building Code Modification Index (11/3/2025 V.1)
Page 61 of 221
Index # Code Modifications New/Continuation
IRC 2024 03 Section R315 Sleeping Lofts New from HBA of SC
IRC 2024 18 R316.3 Story above grade plane Continuation
IRC 2024 19 R318.3.1 Floor elevations at the required egress doors New from HBA of SC
IRC 2024 20 R318.7.5.1 Risers Continuation
IRC 2024 03 R319.1 Emergency escape and rescue opening required New from HBA of SC
IRC 2024 21 R321.1.1 Where required Continuation
IRC 2024 22 R321.2 Window fall protection Continuation
IRC 2024 23 R325.3 Mechanical ventilation Continuation
IRC 2024 24 Figure R327.1 Minimum Fixture Clearances Continuation
IRC 2024 25 R404.1.9.2 Masonry piers supporting floor girders Continuation
IRC 2024 26 R408.3 Unvented crawl space Continuation
IRC 2024 27 R408.3 Unvented crawl space Continuation
IRC 2024 28 R408.4 Access Continuation
IRC 2024 29 R408.8 Under-floor vapor retarder Continuation
IRC 2024 30 R502.12.4 Truss design drawings Continuation
IRC 2024 31 R506.3.3 Vapor retarder Continuation
IRC 2024 32 R606.7 Piers Continuation
IRC 2024 33 R802.10.1 Truss design drawings Continuation
IRC 2024 34 Table R905.1.1(2) Underlayment application New from HBA of SC
IRC 2024 35 R905.2.8.5 Drip Edge Continuation
IRC 2024 36 Chapter 11 Energy Efficiency Continuation
IRC 2024 37 M1411.9.1 Auxiliary and secondary drain systems New from HBA of SC
IRC 2024 38 M1411.12 Insulation of refrigerant piping Continuation
IRC 2024 39 M1411.15 Locking access port caps Continuation
IRC 2024 40 M1502.3 Duct termination Continuation
IRC 2024 41 M1502.4.2 Duct Installation Continuation
IRC 2024 42 M1502.4.6 Duct length Continuation
IRC 2024 43 M1503.6 Makeup air Continuation
IRC 2024 44 M1504.3 Exhaust Openings Continuation
IRC 2024 45 M1601.4.1 Joints, Seams and Connections Continuation
IRC 2024 46 G2415.17.1 (404.17.1) Limitations
(IFGC 2024 03)
New from Omega Flex, Inc.
IRC 2024 47 G2418.2 Design and installation Continuation
IRC 2024 48 P2503.6 Shower liner test Continuation
IRC 2024 49 P2503.6 Shower liner test New from HBA of SC
IRC 2024 50 P2603.2.1 Protection against physical damage Continuation
IRC 2024 51 P2603.5 Freezing Continuation
IRC 2024 52 P2603.5 Freezing Continuation
IRC 2024 53 P2705.1 General Continuation
IRC 2024 54 P2705.1 General New from HBA of SC
IRC 2024 55 P2708.4 Shower control valves Continuation
IRC 2024 56 P2713.3 Bathtub and whirlpool bathtub valves Continuation
4
2024 Building Code Modification Index (11/3/2025 V.1)
Page 62 of 221
Index # Code Modifications New/Continuation
IRC 2024 57 P2903.10.3 Fixture valves and access New from HBA of SC
IRC 2024 58 P2903.11 Hose bibb Continuation
IRC 2024 59 P2904.2.4.2.1 Additional requirements for pendent
sprinklers
Continuation
IRC 2024 60 E3601.7.3 Metering centers New from HBA
IRC 2024 61 E3606.5 Surge protection Continuation
IRC 2024 62 E3702.2 Branch-circuit ampere rating New from HBA
IRC 2024 62 E3702.3 Ten-ampere branch circuits New from HBA
IRC 2024 63 E3802.4 In unfinished basements Continuation
IRC 2024 64 E3901.4.2 Island and peninsular countertops and work
surfaces
New from HBA of SC
IRC 2024 64 E3901.4.3 Receptacle outlet location New from HBA of SC
IRC 2024 65 E3902 Ground-Fault and Arc-Fault Circuit-Interrupter
Protection
Continuation
IRC 2024 66 E3902.5 Basement receptacles Continuation
IRC 2024 67 E3902.12 Specific appliance outlets New from HBA of SC
IRC 2024 68 E3902.14 Outdoor outlets
(NEC 2023 02)
Continuation
IRC 2024 69 E3902.21 Arc-fault circuit-interrupter protection Continuation
IRC 2024 70 E4002.11 Bathtub and shower space New from HBA of SC
IRC 2024 71 E4002.14 Tamper-resistant receptacles Continuation
IRC 2024 72 Chapter 44 Referenced Standards Continuation
IRC 2024 73 Chapter 44 Referenced Standards
(IMC 2024 02)
New from Daikin Comfort
IRC 2024 74 Appendix BF Patio Covers Continuation
IRC 2024 75 Appendix BO Existing Buildings and Structures Continuation
IRC 2024 76 Appendix BB Tiny Houses Continuation
2024 INTERNATIONAL FIRE CODE (IFC)
IFC 2024 01 202 General definitions – Primitive camp structure Continuation
IFC 2024 02 202 General definitions – Recreational fire Continuation
IFC 2024 03 [BG] 203.2.8 Assembly Group A-3
(IBC 2024 03)
Continuation
IFC 2024 04 315.3.3 Equipment rooms Continuation
IFC 2024 05 503.1.2 Additional access Continuation
IFC 2024 06 503.2.1 Dimensions Continuation
IFC 2024 07 507.1 Required water supply Continuation
IFC 2024 08 507.5.1 Where required Continuation
IFC 2024 09 507.5.1.1 Hydrant for standpipe systems Continuation
IFC 2024 10 507.5.4 Obstruction Continuation
IFC 2024 11 606.3.3.2 Grease accumulation New from Midlands Fire
Marshal Association
IFC 2024 12 607.1 General Continuation
IFC 2024 13 901.6.3 Records Continuation
5
2024 Building Code Modification Index (11/3/2025 V.1)
Page 63 of 221
Index # Code Modifications New/Continuation
IFC 2024 16 1010.2.13 Controlled egress doors in Group I-1, I-2 and I-4
(Adult Day Care Occupancy only)
(IBC 2024 06)
Continuation
IFC 2024 17 1016.2 Egress through intervening spaces
(IBC 2024 07)
Continuation
IFC 2024 18 1032.11 Maintenance of the listed occupancy load signage New from Midlands Fire
Marshal Association
IFC 2024 19 2303.2 Emergency disconnect switches New from Midlands Fire
Marshal Association
IFC 2024 20 2303.2.2 Testing Continuation
IFC 2024 21 2304.3.6 Communications New from Midlands Fire
Marshal Association
IFC 2024 22 2305.5 Fire extinguishers Continuation
IFC 2024 23 2307.4 Location of dispensing operations and equipment Continuation
IFC 2024 24 2307.7 Public fueling of motor vehicles Continuation
IFC 2024 25 4106.6 Clearance Requirements Continuation
IFC 2024 26 6101.1 Scope Continuation
IFC 2024 27 6104.2 Maximum capacity within established limits New from Southeast
Propane Alliance (SEPA)
IFC 2024 28 6106.1 Attendants Continuation
IFC 2024 29 6107.3 Clearance to combustibles New from Southeast
Propane Alliance (SEPA)
IFC 2024 30 6107.4 Protecting containers from vehicles Continuation
IFC 2024 31 6109.13 Protection of containers Continuation
IFC 2024 32 6110.1 Removed from service New from Southeast
Propane Alliance (SEPA)
IFC 2024 33 6111.2.1 Near residential, educational and institutional
occupancies and other high-risk areas
Continuation
IFC 2024 34 6111.2.1 Near residential, educational and institutional
occupancies and other high-risk areas
New from Southeast
Propane Alliance (SEPA)
2024 INTERNATIONAL PLUMBING CODE (IPC)
IPC 2024 01 202 General Definitions – Drinking Fountain Continuation
IPC 2024 02 202 General Definitions – Bottle-Filling Station Continuation
IPC 2024 03 202 General Definitions – Water Cooler Continuation
IPC 2024 04 202 General Definitions – Water Dispenser Continuation
IPC 2024 05 403.1.1 Fixture calculations
(IBC 2024 11)
Continuation
IPC 2024 06 403.2 Separate facilities
(IBC 2024 12)
Continuation
2024 INTERNATIONAL MECHANICAL CODE (IMC)
IMC 2024 01 504.9.2 Duct Installation Continuation
IMC 2024 02 Table 1103.1 Refrigerant Classification, Amount and OEL
(IRC 2024 73)
New from Daikin Comfort
6
Page 64 of 221
Index # Code Modifications New/Continuation
IMC 2024 03 1109.2.5 Refrigerant pipe shafts New from Johnson and
Associates
IMC 2024 04 1109.3.2 Shaft ventilation New from Daikin Comfort
IMC 2024 02 Chapter 15 Referenced Standards New from Daikin Comfort
2024 INTERNATIONAL FUEL GAS CODE (IFGC)
IFGC 2024 01 401.9 Identification Continuation
IFGC 2024 02 401.10 Third-party testing and Certification Continuation
IFGC 2024 03 404.17.1 Limitations
(IRC 2024 46)
New from Omega Flex, Inc.
IFGC 2024 04 412.4 Listed equipment Continuation
IFGC 2024 05 412.6 Location Continuation
IFGC 2024 06 412.8.3 Vehicle impact protection Continuation
IFGC 2024 07 412.10 Private fueling of motor vehicles Continuation
IFGC 2024 08 505.1.1 Commercial cooking appliances vented by exhaust
hoods
Continuation
2023 NATIONAL ELECTRICAL CODE (NEC)
NEC 2023 01 210.8(A) Dwelling Units Continuation
NEC 2023 02 210.8(F) Outdoor Outlets
(IRC 2024 68)
Continuation
NEC 2023 03 210.12(B) Dwelling Units Continuation
7
Page 65 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 01
Code Section: [A] 101.4.7 Existing Buildings
Proponent: American Concrete Institute (ACI)
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 01 [A] 101.4.7
Reason: To establish minimum requirements for the evaluation, design, construction, repair and
rehabilitation of concrete structural elements in existing buildings.
Modification:
[A] 101.4.7 Existing buildings. The provisions of the International Existing Building Code shall apply to
matters governing the repair, alternation, change of occupancy, addition to and relocation of existing
buildings.
101.4.7.1 Structural concrete. In addition, assessment, repairs, and restoration of structural concrete in
accordance with ACI 562 shall be permitted.
Exception:
ACI 562 shall not be used for the evaluation or design of repairs or rehabilitation of elements of
seismic force-resisting system that result in strength, stiffness, or ductility of those elements
different from the pre-damage condition.
(Add new referenced standard to Chapter 35 as follows)
ACI American Concrete Institute
38800 Country Club Drive
Farmington Hills, MI 48331
Standard reference number Title Referenced in code section number
562-19 Code Requirements for Assessment, Repair, and Rehabilitation of Existing Concrete Structures
101.4.7.1
8
2024 Building Code Modification Index (11/3/2025 V.1)
Page 66 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 02
Code Section: 202 Definitions
Vapor Retarder, Ground Contact (new definition)
Primitive Camp Structure (new definition)
Proponent: Building Officials Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 02 202
IBC 2018 IBC 2018 01 202
Reason: To provide clear definitions and uniform interpretation of the phrases.
Modification:
202 Definitions:
Vapor Retarder, Ground Contact: Ground contact vapor retarder class shall be defined using the
requirements of ASTM E1745, Class A, B, or C -Standard specification for water vapor retarders used in
contact with soil or granular fill under concrete slabs.
Primitive Camp Structure: Shall include any structure permanent or temporary in nature, used for outdoor
camping (transient), open on at least one side with no fully enclosed habitable spaces, less than 400 square
feet under roof, and not classified as a res idential occupancy due to lack of electrical, plumbing,
mechanical and sprinkler systems.
9
2024 Building Code Modification Index (11/3/2025 V.1)
Page 67 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 03
Code Section: 303.4 Assembly Group A-3
Proponent: Building Officials Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 04 303.4
IBC 2018 IBC 2018 02 303.4
Reason: Add to the listing of A-3 occupancies the following use: Structures, without a commercial kitchen,
used in agritourism activity as defined by S.C. Code Ann. 46-53-10(1).
Modification:
303.4 Assembly Group A-3. Group A-3 occupancy includes assembly uses intended for worship, recreation
or amusement and other assembly uses not classified elsewhere in Group A including, but not limited to:
Amusement arcades
Art galleries
Bowling alleys
Community halls
Courtrooms
Dance halls (not including food or drink consumption)
Exhibition halls
Funeral parlors
Greenhouses for the conservation and exhibition of plants that provide public access
Gymnasiums (without spectator seating)
Indoor swimming pools (without spectator seating)
Indoor tennis courts (without spectator seating)
Lecture halls
Libraries
Museums
Places of religious worship
Pool and billiard parlors
Structures, without a commercial kitchen, used in agritourism activity as defined by S.C. Code Ann. 46-53-10(1)
Waiting areas in transportation terminals
10
2024 Building Code Modification Index (11/3/2025 V.1)
Page 68 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 04
Code Section: 312.1 General
Proponent: Building Officials Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 05 312.1
IBC 2018 IBC 2018 03 312.1
Reason: “Structures primarily used or associated with outdoor camping activities” include, but are not limited
to, shelters, tree stands, sheds, rustic cabins, campfire shelters, shelters, tents, tepees, or other indigenous
huts used only for campers or program participants, or used in conjunction with outdoor camping activities
such as hiking, fishing, hunting, or nature appreciation, regardless of material used for construction. These
structures are not to inclu de utilities such as mechanical, electrical or plumbing. Requiring that at least one
side of the building be open will provide ventilation for any outside hearing source or propane lighting that
may be used within the structure, and provide a clear path of egress travel to the outside. Limiting the size to
400 square feet will require larger buildings to be classified as a residential structure. Not allowing electrical,
plumbing or mechanical systems will maintain the integrity of a primitive structure.
Modification:
312.1 General. Buildings and structures of an accessory character and miscellaneous structures not classified in any
specific occupancy shall be constructed, equipped and maintained to conform to the requirements of this code
commensurate with the fire and life hazard incidental to their occupancy. Group U shall include, but not be limited
to, the following:
Agricultural buildings
Aircraft hangars, accessory to a one- or two-family residence (see Section 412.4)
Barns
Carports
Communication equipment structures with a gross floor area of less than 1,500 square feet (139 m2)
Fences more than 7 feet (2134 mm) in height
Grain silos, accessory to a residential occupancy
Livestock shelters
Primitive Camp Structures
Private garages
Retaining walls
Sheds
Stables
Tanks
Towers
11
2024 Building Code Modification Index (11/3/2025 V.1)
Page 69 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 05
Code Section: 706.1 General
Proponent: Building Officials Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 07 706.1
IBC 2018 IBC 2018 05 706.1
Reason: Unusually restrictive —in an attempt to clarify this section for the purpose of uniform
enforcement, the ICC created a huge error which takes away the designers’ options to leave an existing,
nonconforming building alone when separated by a fire wall. The intent was to show that the fire
protection systems, utilities, access, and egress could be one system when a fire wall is utilized, and do
not have to be separate systems due to the fire wall creating different buildings. This requirement would
unjustly and significantly drive up the cost of construction as it relates to additions to existing buildings.
Modification:
706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. Each
portion of a building separated by one or more firewalls may be considered a separate building. The extent
and location of such fire walls shall provide a complete separation. Where a fire wall separates
occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of
each separation shall apply.
12
2024 Building Code Modification Index (11/3/2025 V.1)
Page 70 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 06
Code Section: 1010.2.13 Controlled egress doors in Group I-1, I-2 and I-4 (Adult Day Care Occupancy
only)
Proponent: Midlands Fire Marshal Association
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 10 1010.2.14
Reason: To prevent nuisance alarms and reduce elopement issues when serving clients with Dementia or
Alzheimer’s, or similar health care issues.
Modification:
1010.2.13 Controlled egress doors in Groups I-1, I-2, and I-4 (Adult Day Care Occupancy only).
Controlled egress electrical locking systems where egress is controlled by authorized personnel shall be permitted
on doors in the means of egress in Group I -1, I-2, and I-4 (Adult Day Care occupancy only) occupancies where the
clinical needs of persons receiving care require their containment. Controlled egress doors shall be permitted in such
occupancies where the building is equipped throughout with an automatic sprinkler system in accordance with
Section 903.3.1.1 or an approved automatic smoke detectio n system installed in accordance with Section 907,
provided that the doors are installed and operate in accordance with all of the following:
1. The door's electric locks shall unlock on actuation of the automatic sprinkler system or automatic smoke detection system
allowing immediate free egress.
2. The door's electric locks shall unlock on loss of power to the electrical locking system or to the electric lock mechanism
allowing immediate free egress.
3. The electric locking system shall be installed to have the capability of unlocking the electric locks by a switch located at the
fire command center, a nursing station or other approved location. The switch shall directly break power to the electric lock.
4. A building occupant shall not be required to pass through more than one door equipped with a controlled egress locking
system before entering an exit.
5. The procedures for unlocking the doors shall be described and approved as part of the emergency planning and
preparedness required by Chapter 4 of the International South Carolina Fire Code.
6. All clinical staff shall have the keys, codes or other means necessary to operate the controlled egress electrical locking
systems.
7. Emergency lighting shall be provided at the door.
8. The electromechanical or electromagnetic locking device shall be listed in accordance with either UL 294 or UL 1034.
Exceptions:
1. Items 1 through 4 shall not apply to doors to areas occupied by persons who, because of clinical needs, require restraint
or containment as part of the function of a psychiatric or cognitive treatment area.
2. Items 1 through 4 shall not apply to doors to areas where a listed egress control system is utilized to reduce the risk of
child abduction from nursery and obstetric areas of a Group I-2 hospital.
13
2024 Building Code Modification Index (11/3/2025 V.1)
Page 71 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 07
Code Section: 1016.2 Egress through intervening spaces
Proponent: Building Officials Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 11 1016.2
IBC 2018 IBC 2018 10 1016.2
Reason: This is a longstanding modification that was updated in 2018 based on changes in the 2018 IBC.
The modification provides additional egress options by adding the exceptions below.
Modification:
1016.2 Egress through intervening spaces. Egress through in tervening spaces shall comply with this
section.
1. Exit access through an enclosed elevator lobby is permitted. Where access to two or more exits or
exit access doorways is required in Section 1006.2.1, access to not less than one of the required
exits shall be provided without travel through the enclosed elevator lobbies required by Section
3006 of the South Carolina Building Code . Where the path of exit access travel passes through an
enclosed elevator lobby, the level of protection required for the enclosed elevator lobby is not
required to be extended to the exit unless direct access to an exit is required by other sections of
this code.
2. In other than Group H occupancies, egress from a room or space is allowed to pass through
adjoining or intervening rooms or areas provided that such adjoining rooms or areas and the area
served are accessory to one or the other and provide a discernible path of egress travel to an exit.
3. In Group H occupancies, egress from a room or space is allowed to pass through adjoining or
intervening rooms or areas provided that such adjoining rooms or areas are the same or lesser
hazard occupancy group and provide a discernible path of egress travel to an exit.
4. An exit access shall not pass through a room that can be locked to prevent egress.
Exception: An electrically locked exit access door providing egress from an elevator lobby shall
be permitted in accordance with Section 1010.2.14.
5. Means of egress from dwelling units or sleeping areas shall not lead through other sleeping areas,
toilet rooms or bathrooms.
Exception: Dwelling units or sleeping areas in R -1 and R-2 occupancies shall be permitted to
egress through other sleeping areas serving adjoining rooms that are part of the same dwelling
unit or guest room.
(Page 2 of IBC 2024 07 - Section 1016.2)
14
2024 Building Code Modification Index (11/3/2025 V.1)
Page 72 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
6. Egress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes.
Exceptions:
1. Means of egress are not prohibited through a kitchen area serving adjoining rooms
constituting part of the same dwelling unit or sleeping unit.
2. Means of egress are not prohibited through stockrooms in Group M occupancies where all of
the following are met:
2.1. The stock is of the same hazard classification as that found in the main retail area.
2.2. Not more than 50 percent of the exit access is through the stockroom.
2.3. The stockroom is not subject to locking from the egress side.
2.4. There is a demarcated, minimum 44 -inch-wide (1118 mm) aisle defined by full- or
partial-height fixed wall s a wall not less than 42 inches (1067 mm) high or similar
construction that will maintain the required width and lead directly from the retail area
to the exit without obstructions.
15
2024 Building Code Modification Index (11/3/2025 V.1)
Page 73 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 08
Code Section: 1803.2 Investigations required
Proponent: Building Officials Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 14 1803.2
IBC 2018 IBC 2018 11 1803.2
Reason: The IBC requires a geotechnical investigation for all projects regardless of size. The only exception
which allows the building official to waive the requirements puts unnecessary liability on the building
official to determine if adequate information can be gathered from adjacent sites. In areas that must
account for seismic activity, the conditions may vary in as few as 100 yards. For large commercial projects,
the soil conditions may have a drastic effect on the design of the structure; however, for smaller projects
the soil condition has significantly less bearing on its design. It is often determined on small projects that
the soil conditions do not have an effect on the design of the structure. See ASCE 7 -20-3-1, Exception.
Each of the equations results in a period of vibration of less than 0.5 seconds and exceeds the size of a
typical one-story structure.
Modification:
1803.2 Investigations required. Geotechnical investigations shall be conducted in accordance
with Sections 1803.3 through 1803.5.
Exceptions:
1. The building official shall be permitted to waive the requirement for a geotechnical
investigation where satisfactory data from adjacent areas is available that demonstrates an
investigation is not necessary for any of the conditions in Sections 1803.5.1 through 1803.5.6 and
Sections 1803.5.10 and 1803.5.11.
2. For single story buildings not more than 5,000 sq ft and not more than 30ft in height, a site
specification investigation report is not required if the seismic design category is determined by
the design professional in accordance with Chapter 20 of ASCE 7.
16
2024 Building Code Modification Index (11/3/2025 V.1)
Page 74 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 09
Code Section: 1907.4 Vapor retarder
Proponent: Structural Engineers Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 16 1907.1
IBC 2018 IBC 2018 12 1907.1
Reason: To bring the IBC into compliance with the American Concrete Institute’s standards.
Modification:
1907.4 Vapor retarder. A 6-mil (0.006 inch; 0.15 mm) 10-mil (0.010 inch) polyethylene ground contact
vapor retarder with joints lapped not less than 6 inches (152 mm) shall be placed between the base course
or subgrade and the concrete floor slab, or other approved equivalent methods or materials shall be used
to retard vapor transmission through the floor slab.
Exception: A vapor retarder is not required:
1. For detached structures accessory to occupancies in Group R-3, such as garages, utility buildings
or other unheated facilities.
2. For unheated storage rooms having an area of less than 70 square feet (6.5 m2) and
carports attached to occupancies in Group R-3.
3. For buildings of other occupancies where migration of moisture through the slab from
below will not be detrimental to the intended occupancy of the building.
4. For driveways, walks, patios and other flatwork that will not be enclosed at a later date.
5. Where approved based on local site conditions.
17
2024 Building Code Modification Index (11/3/2025 V.1)
Page 75 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 10
Code Section: 2303.2.3 Other means during manufacture
Proponent: Building Officials Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 17 2303.2.2
IBC 2018 IBC 2018 13 2303.2.2
Reason: The language in the 2018 code would prevent the use of methods for the treatment of fire -
retardant treated wood that have been in use since at least 2009. We’re not aware of any issues with
products that have been tested in accordance with code requirements.
Modification:
[BF] 2303.2.3 Other means during manufacture. For wood products impregnated with chemicals by other
means during manufacture, the treatment shall be an integral part of the manufacturing process of the
wood product. The treatment shall provide permanent protection to all surfaces of the wood product. The
use of paints, coating, stains or other surface treatments is not an approved method of protection as
required in this section.
18
2024 Building Code Modification Index (11/3/2025 V.1)
Page 76 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 11
Code Section: [P] 2902.1.1 Fixture calculations
Emergency Code Modification
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 19 [P] 2902.1.1
Reason: Gender-neutral gang-type bathrooms pose a serious threat to the health and safety of all by
increasing the incident of sexual violence against women and children, as well as increasing the incident
of wrongful accusations of assault, voyeurism, and the like. Gender -neutral gang-type bathrooms also
undermine and reduce the “safe spaces” for victims of human trafficking, as well as discriminating against
women and children by disproportionately decreasing the available number of bathroom spaces for
women and children, while men will have access to both water closet compartments and urinal spaces. In
addition, the common use sink space discriminates against women and children by disproportionately
decreasing the area available for women to address personal needs, such as menstrual or other medical
care, nursing and baby changing activities.
Modification:
[P] 2902.1.1 Fixture calculations. To determine the occupant load of each sex, the total occupant load
shall be divided in half. To determine the required number of fixtures, the fixture ratio or ratios for each
fixture type shall be applied to the occupant load of each sex in accordance with Table 2902.1. Fractional
numbers resulting from applying the fixture ratios of Table 2902.1 shall be rounded up to the next whole
number. For calculations involving multiple occupancies, such fractional numbers for each occupancy shall
first be summed and then rounded up to the next whole number.
Exceptions:
1. The total occupant load shall not be required to be divided in half where approved statistical
data indicates a distribution of the sexes of other than 50 percent of each sex.
2. Where multiple-user facilities are designed to serve all genders, the minimum fixture count
shall be calculated 100 percent, based on total occupant load. In such multiple-user user facilities,
each fixture type shall be in accordance with ICC A117.1
19
2024 Building Code Modification Index (11/3/2025 V.1)
Page 77 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 12
Code Section: [P] 2902.2 Separate facilities
Emergency Code Modification
Previous Code Cycles Previous Modification Number Previous Code Section
IBC 2021 IBC 2021 20 [P] 2902.2
Reason: Exception 6 is not necessary, as Exceptions 1 -5 provide sufficient guidance and latitude for
business, schools, churches and other similar large-capacity spaces, to provide gender-neutral spaces with
adequate privacy protections.
Modification:
[P] 2902.2 Separate facilities. Where plumbing fixtures are required, separate facilities shall be provided
for each sex.
Exceptions:
1. Separate toilet facilities shall not be required for dwelling units and sleeping units.
2. Separate toilet facilities shall not be required in structures or tenant spaces with a total occupant
load, including both employees and customers, of 15 or fewer.
3. Separate toilet facilities shall not be required in mercantile occupancies in which the maximum
occupant load is 100 or fewer.
4. Separate toilet facilities shall not be required in business occupancies in which the maximum
occupant load is 25 or fewer.
5. Separate toilet facilities shall not be required to be designated by sex where single -user toilet
rooms are provided in accordance with Section 2902.1.2.
6. Separate toilet facilities shall not be required where rooms having both water closets and lavatory
fixtures are designed for use by all persons regardless of sex and privacy is provided for water
closets in accordance with Section 405.3.4 of the International Plumbing Code and for urinals in
accordance with Section 405.3.5 of the International Plumbing Code.
20
2024 Building Code Modification Index (11/3/2025 V.1)
Page 78 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Building Code
Modification Index Number: IBC 2024 13
Code Section: Appendix H Signs
Proponent: Structural Engineers Association of South Carolina
Previous Code Cycles Previous Modification
Number
Previous Code Section
IBC 2021 IBC 2021 18 Appendix H
IBC 2018 IBC 2018 14 Appendix H
IBC 2015 IBC 2015 07 Appendix H
IBC 2012 IBC 2012 05 Appendix H
Reason: To provide minimum requirements for signs for the protection of people and property.
Modification:
Appendix H Signs
The provisions in Appendix H are adopted for use statewide.
Appendix H gathers in one place the various standards that regulate the construction and protection of
outdoor signs. Wherever possible, the appendix provides standards in performance language, thus
allowing the widest possible application.
21
2024 Building Code Modification Index (11/3/2025 V.1)
Page 79 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 01
Code Section: R202 Definitions: Accepted Engineering Practice
Proponent: Coastal Code Enforcement Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 01 R202
IRC 2018 IRC 2018 01 R202
IRC 2015 IRC 2015 01 R202
IRC 2012 IRC 2012 01 R202
Reason: To provide a clear definition and uniform interpretation of the phrase.
Modification:
A definition of “Accepted Engineering Practice” was added:
Accepted Engineering Practice . The performance design of structures and/or structural elements that
vary from prescriptive design methods of this code. Such design shall be made with accepted design
standards by a South Carolina licensed Architect or Engineer as permitted by existing state law.
22
2024 Building Code Modification Index (11/3/2025 V.1)
Page 80 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 02
Code Section: R202 Definitions: Crawl Space
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 02 R202
Reason: To provide additional clarification.
Modification:
R202 Definitions
[RB] CRAWL SPACE. An underfloor space that is not a basement. Spaces under decks and porches that do
not contain mechanical equipment and are separated by a foundation wall are not to be considered
crawlspaces.
23
2024 Building Code Modification Index (11/3/2025 V.1)
Page 81 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 03
Code Section: R202 Definitions: Sleeping Loft
R.310.3 Location
R314.1 General
Section R315 Sleeping Lofts
R319.1 Emergency escape and rescue opening required
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: The section is overly restrictive, hard to apply and duplicates existing safety rules.
Modification:
R202 Definitions
[RB] SLEEPING LOFT. A space designated for sleeping on an intermediate level or levels
between the floor and ceiling of a story, open on one or more sides to the room in which the
space is located, and in accordance with Section R315.
(delete section without substitution)
R310.3 Location. Smoke alarms shall be installed in the following locations:
1. In each sleeping room.
2. Outside each separate sleeping area in the immediate vicinity of the bedrooms.
3. On each additional story of the dwelling unit, including basements and habitable attics and not
including crawl spaces and uninhabita ble attics. In dwelling units with split levels and without an
intervening door between the adjacent levels, a smoke alarm installed on the upper level shall suffice
for the adjacent lower level provided that the lower level is less than one full story below the upper
level.
4. Not less than 3 feet (914 mm) horizontally from the door or opening of a bathroom that contains a
bathtub or shower unless this would prevent placement of a smoke alarm required by this section.
5. In the hallway and in the room open to the hallway in dwelling units where the ceiling height of a room
open to a hallway serving bedrooms exceeds that of the hallway by 24 inches (610 mm) or more.
6. Within the room to which a sleeping loft is open, in the immediate vicinity of the sleeping loft .
24
2024 Building Code Modification Index (11/3/2025 V.1)
Page 82 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
(page 2 of IRC 2024 03 - R202, R310.1, etc.)
R314.1 General. Mezzanines shall comply with Sections R314.2 through R314.5.
Exception: Sleeping lofts in dwelling units and sleeping units shall be permitted to comply with
Section R315, subject to the limitations in Section R315.2.
SECTION R315
SLEEPING LOFTS
(Delete section without substitution)
R319.1 Emergency escape and rescue opening required. Basements, habitable attics, the room to which
a sleeping loft is open, and every sleeping room shall have not less than one operable emergency escape
and rescue opening . Where basements contain one or more sleeping rooms, an emergency escape and
rescue opening shall be required in each sleeping room. Emergency escape and rescue openings shall open
directly into a public way, or to a yard or court that opens to a public way.
Exceptions:
1. Basements used only to house mechanical equipment not exceeding a total floor area of 200
square feet (18.58 m2).
2. Storm shelters constructed in accordance with ICC 500.
3. Where the dwelling unit or townhouse unit is equipped with an automatic sprinkler system
installed in accordance with Section P2904, sleeping rooms in basements shall not be required to
have emergency escape and rescue openings provided that the basement has one of the following:
3.1. One means of egress complying with Section R318 and one emergency escape and rescue
opening.
3.2. Two means of egress complying with Section R318.
4. A yard shall not be required to open directly into a public way where the yard opens to an
unobstructed path from the yard to the public way. Such path shall have a width of not less than
36 inches (914 mm).
25
2024 Building Code Modification Index (11/3/2025 V.1)
Page 83 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 04
Code Section: R301.2.1 Wind design criteria
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 04
Reason: Provides added consistency and ease.
Modification:
R301.2.1 Wind design criteria. Buildings and portions thereof shall be constructed in accordance with the
wind provisions of this code using the ultimate design wind speed in Table R301.2 as determined from
Figure R301.2(2) American Society of Civil Engineers (ASCE) Hazard Tool. The local building official may
delineate the wind design category within their jurisdiction, as long as, it does not surpass those provided
on the American Society of Civil Engineers (ASCE) Hazard Tool website. The structural provisions of this
code for wind loads are not permitted where wind design is required as specified in Section R301.2.1.1.
Where different construction methods and structural materials are used for various portions of a building,
the applicable requirements of this section for each portion shall apply. Where not otherwise specified,
the wind loads listed in Table R301.2.1(1) adjusted for height and exposure using Table R301.2.1(2) shall
be used to determine design load performance requirements for wall coverings, curtain walls, roof
coverings, exterior windows, skylights, garage doors and exterior doors. Asphalt shingles shall be designed
for wind speeds in accordance with Section R905.2.4 . Metal roof shingles shall be designed for wind
speeds in accordance with Section R905.4.4. A continuous load path shall be provided to transmit the
applicable uplift forces in Section R802.11 from the roof assembly to the foundation. Where ultimate
design wind speeds in Figure R301.2(2) are less than the lowest wind speed indicated in the prescriptive
provisions of this code, the lowest wind speed indicated in the prescriptive provisions of this code shall be
used.
26
2024 Building Code Modification Index (11/3/2025 V.1)
Page 84 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 05
Code Section: R301.2.2 Seismic provisions
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: The structural requirements add cost without significant safety benefit in low -to-moderate
seismic rick areas.
Modification:
(removes “C” from #1 below)
R301.2.2 Seismic provisions. Buildings within the scope of this code as defined in Section R101.2 shall be
constructed in accordance with the requirements of this section and other seismic requirements of this
code. The seismic provisions of this code shall apply as follows:
1. Townhouses and buildings as permitted by the exceptions to Section R101.2 containing three or
more dwelling units in Seismic Design Categories C, D0, D 1 and D2.
2. Detached one- and two-family dwellings and buildings as permitted by the exceptions to Section
R101.2 containing less than three dwelling units in Seismic Design Categories D0, D 1 and D2.
Buildings in Seismic Design Category E shall be designed to resist seismic loads in accordance with
the International Building Code , except where the seismic design categ ories are reclassified to
lower seismic design categories in accordance with Section R301.2.2.1. Components of buildings
not required to be designed to resist seismic loads shall be constructed in accordance with the
provisions of this code.
27
2024 Building Code Modification Index (11/3/2025 V.1)
Page 85 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 06
Code Section: R301.2.2.1 Determination of seismic design category
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 04
Reason: Provides added consistency and ease.
Modification:
R301.2.2.1 Determination of seismic design category. Buildings shall be assigned a seismic design
category in accordance with the American Society of Civil Engineers (ASCE) Hazard Tool . Figures
R301.2.2.1(1) through R301.2.2.1(7), except as otherwise required by Section R401.4. The local building
official may delineate the seismic design category within the jurisdiction, as long as, it does not surpass
those provided on the American Society of Civil Engineers (ASCE) Hazard Tool website.
28
2024 Building Code Modification Index (11/3/2025 V.1)
Page 86 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 07
Code Section: R302.1 Exterior Walls (adds exception #6)
Proponent: Coastal Code Enforcement Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 06 R302.1
IRC 2018 IRC 2018 04 R302.1
IRC 2015 IRC 2015 01 R302.1
IRC 2012 IRC 2012 02 R302.1
Reason: To provide a clear definition and uniform interpretation of the phrase
Modification:
R302.1 Exterior walls. Construction, projections, openings and penetrations of exterior walls of
dwellings, townhouses and accessory buildings shall comply with Table R302.1(1) based on fire
separation distance; or dwellings and townhouses equipped throughout with an automatic sprinkler
system installed in accordance with Section P2904 shall comply with Table R302.1(2) based on fire
separation distance.
For the purposes of determining fire separation distance, dwellings and townhouses on the same
lot shall be assumed to have an imaginary line between them. Where a new dwelling or townhouse is to
be erected on the same lot as an existing dwelling or townhouse, the location of the assumed imaginary
line with relation to the existing dwelling or townhouse shall be such that the exist ing dwelling or
townhouse meets requirements of this section.
Where a lot line exists between adjacent townhouse units, fire separation distance of exterior walls
shall be measured to the lot line. Where a lot line does not exist between adjacent townhouse units, an
imaginary line shall be assumed between the adjacent townhouse units and fire separation distance of
exterior walls shall be measured to the imaginary line. Fire separation distance and requirements of
Section R302.1 shall not apply to walls separating townhouse units that are required by Section R302.2.
Exceptions:
1. Walls, projections, openings or penetrations in walls perpendicular to the line used to determine
the fire separation distance.
2. Walls of individual dwelling units and their accessory buildings located on the same lot.
3. Detached tool sheds and storage sheds, playhouses and similar structures exempted from permits
are not required to provide wall protection based on location on the lo t. Projections beyond the
exterior wall shall not extend over the lot line.
29
2024 Building Code Modification Index (11/3/2025 V.1)
Page 87 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
(page 2 of IRC 2024 07- R302.1)
4. Detached garages accessory to a dwelling unit located within 2 feet (610 mm) of a lot line are
permitted to have roof eave projections not exceeding 4 inches (102 mm).
5. Foundation vents installed in compliance with this code are permitted.
6. Fire separation distance.
a. The minimum fire separation distance for improvement constructed on a lot shown on: [ i ] a
recorded bonded or final subdivision plat, or [ii] a sketch plan, site plan, plan of phased
development or preliminary plat approved by the local governing authority, which was recorded
or approved prior to the implementation of 2012 International Residential Code and which shows
or describes lesser setbacks than the fire separation distances provided in Table R302.1(1), shall
be equal to the lesser setbacks, but in no event less than 3 feet (914 mm).
b. The minimum fire separation distance for improvements constructed on a lot where the local
governing authority has, prior to the implementation of 2012 International Residential Code: [ i ]
accepted exactions or issued conditions, [ ii ] granted a special exception, [ iii ] entered into a
development agreement, [ iv ] approved a variance, [ v ] approved a planned development district,
or [ vi ] otherwise approved a specific development plan which contemplated or provided for
setbacks less than the fire separation distances provided in Table R302.1(1), shall be equal to the
lesser setback, but in no event less than 3 feet (914 mm).
30
2024 Building Code Modification Index (11/3/2025 V.1)
Page 88 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 08
Code Section: R302.1 Exterior Walls (adds exception #7)
Proponent: Building Official’s Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 06 R302.1
Reason: To account for eave projections on townhomes.
Modification:
(Modification adds below exception to prior modification IRC 2024 07 for Section R302.1 Exterior walls)
Exceptions:
7. Aesthetic roof and siding projections may extend beyond the common wall of a townhouse unit
over an adjoining unit's property line as long as the construction of the projection does not damage
the integrity of the fire -rated assembly, the projection is completely supported by the common
wall, the projection is protected by a 1 -hour construction or fire retardant -treated wood, and the
projection is limited to 18 inches (457 mm). These projections shall not contain any plumbing,
electrical or mechanical installations. An easement may be required by the jurisdiction to ensure
future access to this projection for repair and maintenance.
31
2024 Building Code Modification Index (11/3/2025 V.1)
Page 89 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 09
Code Section: R302.2.7 Meter Location (new section)
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: Provides design and installation flexibility. Aligns with utility company practices and NEC
requirements. Maintains fire-resistance integrity of common walls. Clarifies enforcement for local building
officials and reduces conflicts during plan review.
Modification:
R.302.2.7 Meter Location. Installation of multiple electrical meters on the exterior wall of townhomes is
permitted, provided the installation does not breach the fire-resistance-rated wall assembly.
32
2024 Building Code Modification Index (11/3/2025 V.1)
Page 90 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 10
Code Section: R302.4.1 Through penetrations
Proponent: Building Official’s Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 09 R302.4.1
Reason: The common walls between townhouses are essentially property lines between adjacent
owners, and utilities or services of any kind should not pass through a property line.
Modification:
R302.4.1 Through penetrations. Through penetrations of fire-resistance-rated wall or floor assemblies
shall comply with Section R302.4.1.1 or R302.4.1.2. No penetrations shall pass completely through the
fire-rated assembly separating townhouse units.
Exceptions:
1. Where the penetrating items are steel, ferrous or copper pipes, tubes or conduits, the annular
space shall be protected as follows:
1.1. In concrete or masonry wall or floor assemblies, concrete, grout or mortar shall be permitted
where installed to the full thickness of the wall or floor assembly or the thickness required to
maintain the fire-resistance rating, provided that both of the following are complied with:
1.1.1. The nominal diameter of the penetrating item is not more than 6 inches (152 mm).
1.1.2. The area of the opening through the wall does not exceed 144 square inches
(92 900 mm2).
1.2. The material used to fill the annular space shall prevent the passage of flame and hot gases
sufficient to ignite cotton waste where subjected to ASTM E119 or UL 263 time temperature
fire conditions under a positive pressure differential of not less than 0.01 inch of water (3 Pa)
at the location of the penetration for the time period equivalent to the fire -resistance rating
of the construction penetrated.
2. The annular space created by the penetration of water -filled fire sprinkler piping, provided that
the annular space is filled using a material complying with Item 1.2 of Exception 1.
33
2024 Building Code Modification Index (11/3/2025 V.1)
Page 91 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 11
Code Section: R302.5.1 Opening protection
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 10 R302.5.1
IRC 2018 IRC 2018 05 R302.5.1
IRC 2015 IRC 2015 05 R302.5.1
Reason: Lack of supporting documentation proving that self -closing devices contribute to fire or carbon
monoxide safety.
Modification:
R302.5.1 Opening protection. Openings from a private garage directly into a room used for sleeping
purposes shall not be permitted. Other openings between the garage and dwelling unit shall be equipped
with solid wood doors not less than 1 3/8 inches (35 mm) in thickness, solid or hon eycomb-core steel
doors not less than 1 3/8 inches (35 mm) thick, or 20-minute fire-rated doors. Doors shall be self-latching
and equipped with a self-closing or automatic-closing device.
34
2024 Building Code Modification Index (11/3/2025 V.1)
Page 92 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 12
Code Section: R302.13 Fire protection of floors
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 11 R302.13
IRC 2018 IRC 2018 06 R302.13
IRC 2015 IRC 2015 06 R302.13
Reason: Requirements are unwarranted and unnecessary.
Modification:
R302.13 Fire protection of floors. Floor assemblies that are not required elsewhere in this code to be fire-
resistance rated, shall be provided with a 1/2-inch (12.7 mm) gypsum wallboard membrane, 5/8-inch (16
mm) wood structural panel membrane, or equivalent on the underside of the floor f raming member.
Penetrations or openings for ducts, vents, electrical outlets, lighting, devices, luminaires, wires, speakers,
drainage, piping and similar openings or penetrations shall be permitted.
Exceptions:
1. Floor assemblies located directly over a space protected by an automatic sprinkler system in
accordance with Section P2904, NFPA 13D, or other approved equivalent sprinkler system.
2. Floor assemblies located directly over a crawl space not intended for storage or for the installation of
fuel-fired or electric-powered heating appliances. Floor assemblies located directly over a crawl space.
3. Portions of floor assemblies shall be permitted to be unprotected where complying with the following:
3.1. The aggregate area of the unprotected portions does not exceed 80 square feet (7.4 m2) per story.
3.2. Fireblocking in accordance with Section R302.11.1 is installed along the perimeter of the
unprotected portion to separate the unprotected portion from the remainder of the floor assembly.
4. Wood floor assemblies using dimension lumber or structural composite lumber equal to or greater
than 2-inch by 10-inch (50.8 mm by 254 mm) nominal dimension, or other approved floor assemblies
demonstrating equivalent fire performance.
5. Wood floor assemblies less than 600 square feet (55.7 m2) within detached accessory structures with
no habitable space above them.
35
2024 Building Code Modification Index (11/3/2025 V.1)
Page 93 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 13
Code Section: 304.1.1 Field treatment
Proponent: Structural Engineers Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 22 R317.1.1
IRC 2018 IRC 2018 14 R317.1.1
IRC 2015 IRC 2015 13 R317.1.1
IRC 2012 IRC 2012 12 R317.1.1
Reason: To add the preservative-treated wood product manufacturer’s field treatment
recommendations as a method of compliance.
Modification:
R304.1.1 Field treatment. Field-cut ends, notches and drilled holes of preservative-treated wood shall
be treated in the field in accordance with AWPA M4 or in accordance with the preservative-treated
wood product manufacturer’s recommendations.
36
2024 Building Code Modification Index (11/3/2025 V.1)
Page 94 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 14
Code Section: R305.1 Subterranean termite control methods
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 23 318.1
IRC 2018 IRC 2018 15 318.1
Reason: Provides clarification that additional treatment methods are permissible if it adheres to Section
27-1085 of the Rules and Regulations for the Enforcement of the South Carolina Pesticide Control Act and
enforced by the Clemson University Department of Pesticide Regulations.
Modification:
R305.1 Subterranean termite control methods. In areas subject to damage from termites as
indicated by Table R301.2 , protection shall be by one, or a combination, of the following
methods:
1. Chemical termiticide treatment in accordance with Section R305.2.
2. Termite-baiting system installed and maintained in accordance with the label.
3. Pressure-preservative-treated wood in accordance with the provisions of Section R304.1.
4. Naturally durable termite-resistant wood.
5. Physical barriers in accordance with Section R305.3 and used in locations as specified in Section
R304.1.
6. Cold-formed steel framing in accordance with Sections R505.2.1 and R603.2.1.
7. Treatments may be conducted as outlined in Section 27-1085 of the Rules and Regulations for the
Enforcement of the South Carolina Pesticide Control Act and enforced by the Clemson University
Department of Pesticide Regulation.
37
2024 Building Code Modification Index (11/3/2025 V.1)
Page 95 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 15
Code Section: R305.4 Foam Plastic Protection
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 24 R318.4
IRC 2018 IRC 2018 16 R318.4
Reason: Provided language establishes a best management practice in order to inspect for termites and
other wood-destroying organisms. The exception should be deleted due to a lack of rigorous experimental
investigation and robust data to indicate a foam insulation product can be treated or produced in a way
to make the product 100 % effective against subterranean termite damage or an effective barrier to
prevent termites a route into a structure.
Modification:
R305.4 Foam plastic protection. In areas where the probability of termite infestation is “very heavy” as
indicated in Figure R305.4, extruded and expanded polystyrene, polyisocyanurate and other foam plastics
shall not be installed on the exterior face or under interior or exterior foundation walls or slab foundations
located below grade. The clearance between foam plastics installed above grade and exposed earth shall
be not less than 6 inches (152 mm). For crawl space applications, foam plastic shall be installed so as to
provide a termite inspection gap of no less than 6 inches (152 mm) along the top of the foundation w all
and foundation sill plate.
Exceptions:
1. Buildings where the structural members of walls, floors, ceilings and roofs are entirely
of noncombustible materials or pressure-preservative-treated wood.
2.Where in addition to the requirements of Section R318.1, an approved method of protecting
the foam plastic and structure from subterranean termite damage is used.
3.2. On the interior side of basement walls.
38
2024 Building Code Modification Index (11/3/2025 V.1)
Page 96 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 16
Code Section: R305.5 Termite inspection strip
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 25 R318.5
Reason: Provides added consistency and ease for inspections
Modification:
R305.5 Termite inspection strip. Where foam plastic is applied in accordance with Section R318.4 , a
continuous 6 -inch (152 mm) strip centered along the sill plate shall be left open for termite activity
inspection.
39
2024 Building Code Modification Index (11/3/2025 V.1)
Page 97 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 17
Code Section: R309 Automatic Sprinkler Systems
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 18 R313
IRC 2018 IRC 2018 12 R313
IRC 2015 IRC 2015 12 R313
IRC 2012 IRC 2012 10 R313.1
IRC 2012 IRC 2012 11 R313.2
Reason: Unusually restrictive
Modification:
SECTION R309
AUTOMATIC FIRE SPRINKLER SYSTEMS
R309.1 Townhouse automatic fire sprinkler systems. An automatic residential fire sprinkler system shall not be
required to be installed in townhouses when constructed in accordance with Section R302.2.
Exception: An automatic residential fire sprinkler system shall not be required where additions or
alterations are made to existing townhouses that do not have an automatic residential fire sprinkler
system installed.
R309.1.1 Design and installation. Automatic residential fire sprinkler systems for townhouses when installed shall
be designed and installed in accordance with Section P2904 or NFPA 13D.
R309.2 One- and two-family dwellings automatic sprinkler systems. An automatic residential fire sprinkler
system shall be installed shall not be required to be installed in one- and two-family dwellings.
Exception: An automatic sprinkler system shall not be required for additions or alterations to
existing buildings that are not already provided with a sprinkler system.
R309.2.1 Design and installation. Automatic residential fire sprinkler systems when installed shall be designed
and installed in accordance with Section P2904 or NFPA 13D.
40
2024 Building Code Modification Index (11/3/2025 V.1)
Page 98 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 18
Code Section: R316.3 Story above grade plane
Proponent(s): Home Builders Association of South Carolina (2021) and Building Officials Association of
South Carolina (2024)
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 29 R326.3
Reason: The deletions bring the definition of the habitable attic in line with the 2018 IRC.
Modification:
R316.3 Story above grade plane. A habitable attic shall be considered a story above grade plane.
Exceptions: A habitable attic shall not be considered to be a story above grade plane provided
that the habitable attic meets all the following:
1. The aggregate area of the habitable attic is either of the following:
1.1. Not greater than one-third one-half of the floor area of the story below.
1.2. Not greater than one-half of the floor area of the story below where the habitable
attic is located within a dwelling unit equipped with an automatic fire sprinkler system in
accordance with Section P2904.
2. The occupiable space is enclosed by the roof assembly above, knee walls, if applicable, on the
sides and the floor- ceiling assembly below.
3. The floor of the habitable attic does not extend beyond the exterior walls of the story below.
4. Where a habitable attic is located above a third story, an automatic sprinkler system in
accordance with Section P2904 shall be installed in the habitable attic and remaining portion
of the townhouse unit or dwelling unit or units located beneath the habitable attic.
41
2024 Building Code Modification Index (11/3/2025 V.1)
Page 99 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 19
Code Section: R318.3.1 Floor elevations at the required egress doors
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: Replacing “threshold” with “primary floor level” provides clarity for enforcement and design.
“Threshold” can vary by product, while “primary floor level” offers a consistent, measurable reference.
Modification:
R318.3.1 Floor elevations at the required egress doors. Landings or finished floors at the required egress
door shall be not more than 1 1/2 inches (38 mm) lower than the top of the threshold primary floor level.
Exception: The landing or floor on the exterior side shall be not more than 7 3/4 inches (196 mm)
below the top of the threshold provided that the door does not swing over the landing or floor.
Where exterior landings or floors serving the required egress door are not at grade, they shall be
provided with access to grade by means of a ramp in accordance with Section R318.8 or a stairway in
accordance with Section R318.7.
42
2024 Building Code Modification Index (11/3/2025 V.1)
Page 100 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 20
Code Section: R318.7.5.1 Risers
Proponent: Structural Engineers Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 15 R311.7.5.1
IRC 2018 IRC 2018 09 R311.7.5.1
IRC 2015 IRC 2015 09 R311.7.5.1
IRC 2012 IRC 2012 07 R311.7.5.1
Reason: To establish a maximum height for masonry risers
Modification:
R318.7.5.1 Risers. The maximum riser height shall be not more than 7 3/4 inches (196 mm). The
maximum riser height for masonry stairs shall be 8 inches (203 mm). The riser height shall be measured
vertically between leading edges of the adjacent treads. The greatest riser height within any flight of stairs
shall not exceed the smallest by more than 3/8 inch (9.5 mm). Risers shall be vertical or sloped from the
underside of the nosing of the tread above at an angle not more than 30 degrees (0.51 rad) from the
vertical. At open risers, openings located more than 30 inches (762 mm), as measured vertically, to the
floor or grade below shall not permit the passage of a 4- inch-diameter (102 mm) sphere.
Exceptions:
1. The opening between adjacent treads is not limited on spiral stairways.
2. The riser height of spiral stairways shall be in accordance with Section 318.7.11.1.
3. The opening between adjacent treads is not limited on stairs with a total rise of 30 inches (762 mm)
or less.
43
2024 Building Code Modification Index (11/3/2025 V.1)
Page 101 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 21
Code Section: R321.1.1 Where required
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 16 R312.1.1
IRC 2018 IRC 2018 10 R312.1.1
IRC 2015 IRC 2015 10 R312.1.1
IRC 2012 IRC 2012 08 R312.1.1
Reason: No technical justification to substantiate a 36-inch measurement away from the leading edge of
the walking surface or tread to determine when a guard should be required.
Modification:
R321.1.1 Where required. Guards shall be provided for those portions of open -sided walking surfaces,
including floors, stairs, ramps and landings that are located more than 30 inches (762 mm) measured
vertically to the floor or grade below at any point within 36 inches (914 mm) horizontally to the edge of
the open side. Insect screening shall not be considered as a guard.
Guards shall be located along open -sided walking surfaces of all decks, porches, balconies, floors, stairs,
ramps and landings that are located more than 30 inches (762 mm) measured vertically to the floor or
grade below; and at any point where a downward slope exceeds 3V:12H within 36 inches (914 mm)
horizontally to the edge of the open side. Insect screening shall not be considered as a guard.
44
2024 Building Code Modification Index (11/3/2025 V.1)
Page 102 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 22
Code Section: R321.2 Window fall protection
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 17 R312.2
IRC 2018 IRC 2018 11 R312.2
IRC 2015 IRC 2015 11 R312.2
IRC 2012 IRC 2012 09 R312.2
Reason: Unusually restrictive
Modification:
(Delete without substitution)
R321.2 Window fall protection. Window fall protection shall be provided in accordance with Sections
R321.2.1 and R321.2.2.
R321.2.1 Window opening height. In dwelling units, where the bottom of the clear opening of an
operable window opening is located less than 24 inches (610 mm) above the finished floor and
greater than 72 inches (1829 mm) above the finished grade or other surface below on the exterior
of the building, the operable window shall comply with one of the following:
1. Operable window openings will not allow a 4 -inch-diameter (102 mm) sphere to pass
through where the openings are in their largest opened position.
2. Operable windows are provided with window opening control devices or fall prevention
devices that comply with ASTM F2090.
R321.2.2 Emergency escape and re scue openings. Where an operable window serves as an
emergency escape and rescue opening, a window opening control device or fall prevention device,
after operation to release the control device or fall prevention device allowing the window to fully
open, shall not reduce the net clear opening area of the window unit to less than the area required
by Sections R319.2.1 and R319.2.2.
45
2024 Building Code Modification Index (11/3/2025 V.1)
Page 103 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 23
Code Section: R325.3 Mechanical ventilation
Proponent: Coastal Code Enforcement Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 12 R303.4
IRC 2018 IRC 2018 07 R303.4
IRC 2015 IRC 2015 07 R303.4
IRC 2012 IRC 2012 05 R303.4
Reason: The blower door test is not required with the current State Energy Standard (2009 International
Energy Conservation Code) and is not applicable.
Modification:
(Delete without substitution)
R303.4 Mechanical ventilation. Buildings and dwelling units complying with Section 1102.5.1 shall be
provided with mechanical ventilation in accordance with Section M1505, or with other approved means
of ventilation.
46
2024 Building Code Modification Index (11/3/2025 V.1)
Page 104 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 24
Code Section: Figure R327.1 Minimum Fixture Clearances
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 13 R307.1
IRC 2018 IRC 2018 08 R307.1
IRC 2015 IRC 2015 08 R307.1
IRC 2012 IRC 2012 06 R307.2
IRC 2006 IRC 2006 09 R307.2
IRC 2003 IRC 2003 05 R307.2
Reason: No valid reason exists to justify a minimum clearance of 15 inches
Modification:
Change the minimum dimension for the side clearance between bathtubs and water closets or bidets from
15 inches to 12 inches.
47
2024 Building Code Modification Index (11/3/2025 V.1)
Page 105 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 25
Code Section: R404.1.9.2 Masonry piers supporting floor girders
Proponent: Home Builders Association of South Carolina and Structural Engineers Association of South
Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 31 R404.1.9.2
IRC 2018 IRC 2018 20 R404.1.9.2
IRC 2015 IRC 2015 16 R404.1.9.2
IRC 2012 IRC 2012 13 R404.1.9.2
Reason: Unusually restrictive
Modification:
R404.1.9.2 Masonry piers supporting floor girders. Masonry piers supporting wood girders sized in
accordance with Tables R602.7(1) and R602.7(2) shall be permitted in accordance with this section. Piers
supporting girders for interior bearing walls shall have a minimum nominal dimension of 12 inches (305
mm) and a maximum height of 10 feet (3048 mm) be filled solidly with grout or type M or S mort ar and
shall have a minimum nominal dimension of 8 inches (203 mm) and a maximum height not exceeding 10
times the nominal thickness from top of footing to bottom of sill plate or girder. Piers supporting girders
for exterior bearing walls shall have a min imum nominal dimension of 12 inches (305 mm) and a
maximum height of 4 feet (1220 mm) from top of footing to bottom of sill plate or girder. Piers supporting
beams and girders for exterior bearing walls shall be filled solidly with grout or type M or S mor tar; shall
contain a minimum of one #4 (13 mm) dowel mid -depth; and shall have a minimum nominal dimension
of 8 inches (203 mm) and a maximum height of 4 times the nominal thickness from top of footing to
bottom of sill plate or girder unless it can be sho wn by accepted engineering practice that there is
sufficient foundation wall along the foundation line to resist the imposed lateral loads, in which case the
maximum height shall not exceed 10 times the nominal thickness. Girders and sill plates shall be anchored
to the pier or footing in accordance with Section R403.1.6 or Figure R404.1.5.3. Floor girder bearing shall
be in accordance with Section R502.6.
48
2024 Building Code Modification Index (11/3/2025 V.1)
Page 106 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 26
Code Section: R408.3 Unvented Crawl Space
Proponent: Structural Engineers Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 32 R408.3
IRC 2018 IRC 2018 21 R408.3
Reason: ASTM E1745 is the industry standard for plastic vapor retarders used under concrete slabs or in
contact with soil. It is also the main standards for evaluating plastic films that will be used in this application.
Three performance classes are outlined A, B and C (with Class A being the strongest). Performance levels are
the same for each class, less than 0.1 perms. Tensile strength and puncture resistance change with each class.
ASTM E1745 refers to ASTM E154 “Standard Test Methods for Water Vapor Retarders Used in Contact with
Earth Under Concrete Slabs, On Walls or as Ground Cover”, which describes test methods for testing the
performance of a plastic film after it is subjected to certain elements. These standards outline the methodology
whereby plastic vapor retarders are tested. Simply having a low perm rating is not enough when it comes to
real-life conditions. Vapor retarders/barriers must also be tough enough to endure the rigors of construction,
since this will determine their true long-term ability to protect against water vapor intrusion.
Modification:
R408.3 Unvented crawl space. For unvented under-floor spaces, the following items shall be provided:
1. Exposed earth shall be covered with a continuous Class I vapor retarder meeting ASTM E1745 Class A. Joints
of the vapor retarder shall overlap by 6 inches (152 mm) and shall be sealed or taped. The edges of the vapor
retarder shall extend not less than 6 inches (152 mm) up the stem wall and shall be attached and sealed to
the stem wall or insulation.
2. One of the following shall be provided for the under-floor space:
2.1. Continuously operated mechanical exhaust ventilation at a rate equal to 1 cubic foot per minute
(0.47 L/s) for each 50 square feet (4.7m 2) of crawl space floor area, including an air pathway to the
common area (such as a duct or transfer grille), and perimeter walls insulated in accordance with
Section N1102.2.11.1.
2.2. Conditioned air supply sized to deliver at a rate equal to 1 cubic foot per minute (0.47 L/s) for each
50 square feet (4.7 m2) of under-floor area, including a return air pathway to the common area (such
as a duct or transfer grille), and perimeter walls insulated in accordance with Section N1102.2.11.1.
2.3. Plenum in existing structures complying with Section M1601.5, if under -floor space is used as a
plenum.
2.4. Dehumidification sized in accordance with manufacturer's specifications.
49
2024 Building Code Modification Index (11/3/2025 V.1)
Page 107 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 27
Code Section: R408.3 Unvented Crawl Space
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 33 R408.3
IRC 2018 IRC 2018 21 R408.3
Reason: Provides added clarity and consistency of codes between regulation and statute.
Modification:
R408.3 Unvented crawl space. For unvented under-floor spaces, the following items shall be provided:
1. Exposed earth shall be covered with a continuous vapor retarder meeting ASTM E1745 Class A. Joints
of the vapor retarder shall overlap by 6 inches (152 mm) and shall be sealed or taped. The edges of the
vapor retarder shall extend not less than 6 inches (152 mm) up the stem wall and shall be attached and
sealed to the stem wall or insulation.
2. One of the following shall be provided for the under-floor space:
2.1. Continuously operated mechanical exhaust ventilation at a rate equal to 1 cubic foot per minute (0.47 L/s) for
each 50 square feet (4.7m2) of crawl space floor area, including an air pathway to the common area (such as
a duct or transfer grille), and perimeter walls insulated in accordance with Section N1102.2.11.1 the South
Carolina Energy Standard Act.
2.2. Conditioned air supply sized to deliver at a rate equal to 1 cubic foot per minute (0.47 L/s) for each 50 square
feet (4.7 m2) of under-floor area, including a return air pathway to the common area (such as a duct or transfer
grille), and perimeter walls insulated in accordance with Section N1102.2.11.1 the South Carolina Energy
Standard Act.
2.3. Plenum in existing structures complying with Section M1601.5, if under-floor space is used as a plenum.
2.4. Dehumidification sized in accordance with manufacturer's specifications.
50
2024 Building Code Modification Index (11/3/2025 V.1)
Page 108 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 28
Code Section: R408.4 Access
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 34 R408.4
IRC 2018 IRC 2018 22 R408.4
IRC 2015 IRC 2015 17 R408.4
Reason: To allow access openings under a doorway
Modification:
R408.4 Access. Access shall be provided to all under-floor spaces. Access openings through the floor shall
be not smaller than 18 inches by 24 inches (457 mm by 610 mm). Openings through a perimeter wall
shall be not less than 16 inches by 24 inches (407 mm by 610 mm). W here any portion of the through -
wall access is below grade, an areaway not less than 16 inches by 24 inches (407 mm by 610 mm) shall
be provided. The bottom of the areaway shall be below the threshold of the access opening. Through
wall access openings shall not be located under a door to the residence. See Section M1305.1.3 for access
requirements where mechanical equipment is located under floors.
51
2024 Building Code Modification Index (11/3/2025 V.1)
Page 109 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 29
Code Section: R408.8 Under floor vapor retarder
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 35 R408.4
Reason: Application is not practical.
Modification:
(Section deleted without substitution)
R408.8 Under -floor vapor retarder. In Climate Zones 1A, 2A and 3A below the warm -humid line, a
continuous Class I or II vapor retarder shall be provided on the exposed face of air-permeable insulation
installed between the floor joists and exposed to the grade in the under -floor space. The vapor retarder
shall have a maximum water vapor permeance of 1.5 perms when tested in accordance with Procedure B
of ASTM E96.
Exception: The vapor retarder shall not be required in unvented crawl spaces constructed in
accordance with Section R408.3.
52
2024 Building Code Modification Index (11/3/2025 V.1)
Page 110 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 30
Code Section: R502.12.4 Truss design drawings
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 36 R502.11.4
IRC 2018 IRC 2018 23 R502.11.4
IRC 2015 IRC 2015 18 R502.11.4
IRC 2012 IRC 2012 14 R502.11.4
IRC 2006 IRC 2006 21 R502.11.4
IRC 2003 IRC 2003 17 R502.11.4
Reason: The section was modified to allow the approval of truss design drawings by local building officials
to occur at the time of the framing inspection, rather than at an undefined time prior to installation.
Modification:
R502.12.4 Truss design drawings. Truss design drawings , prepared in compliance with Section
R502.12.1, shall be submitted to the building official and approved prior to installation at the time of
their inspection. Truss design drawings shall be provided with the shipment of trusses delivered to the
job site. Truss design drawings shall include, at a minimum, the information specified as follows:
(No changes to items 1-12)
53
2024 Building Code Modification Index (11/3/2025 V.1)
Page 111 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 31
Code Section: R506.3.3 Vapor retarder
Proponent: Structural Engineers’ Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 37 R506.2.3
IRC 2018 IRC 2018 24 R506.2.3
IRC 2015 IRC 2015 19 R506.2.3
Reason: It is a fairly common practice for garages to be transformed into conditioned space at which time
having a vapor retarder becomes necessary, or to be converted to storage space (over 70 sq. ft.) at which
time a vapor barrier is required.
Modification:
R506.3.3 Vapor retarder. A minimum 6 mil (0.006 inch; 152 μm) polyethylene or approved vapor retarder
with joints lapped not less than 6 inches (152 mm) shall be placed between the concrete floor slab and
the base course or the prepared subgrade where a base course does not exist.
Exception: The vapor retarder is not required for the following:
1. Garages, utility buildings and other unheated accessory structures.
2. For unheated storage rooms having an area of less than 70 square feet (6.5 m2) and carports.
3. Driveways, walks, patios and other flatwork not likely to be enclosed and heated at a later date.
4. Where approved by the building official, based on local site conditions.
54
2024 Building Code Modification Index (11/3/2025 V.1)
Page 112 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 32
Code Section: R606.7 Piers
Proponent: Structural Engineers’ Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 38 R606.7
IRC 2018 IRC 2018 25 R606.7
IRC 2015 IRC 2015 20 R606.7
Reason: To allow the use of only type M or S mortar to comply with ACI 530 which disallows the use of
type N mortar in foundation walls.
Modification:
R606.7 Piers. The unsupported height of masonry piers shall not ex ceed 10 times their least dimension.
Where structural clay tile or hollow concrete masonry units are used for isolated piers to support beams
and girders, the cellular spaces shall be filled solidly with grout or Type M or S mortar, except that unfilled
hollow piers shall be permitted to be used if their unsupported height is not more than four times their
least dimension. Where hollow masonry units are solidly filled with grout or Type M or S or N mortar, the
allowable compressive stress shall be permitted to be increased as provided in Table R606.9.
55
2024 Building Code Modification Index (11/3/2025 V.1)
Page 113 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 33
Code Section: R802.10.1 Truss design drawings
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 39 R802.10.1
IRC 2018 IRC 2018 26 R802.10.1
IRC 2015 IRC 2015 21 R802.10.1
Reason: The section was modified to allow the approval of truss design drawings by local building officials
to occur at the time of the framing inspection, rather than at an undefined time prior to installation.
Modification:
R802.10.1 Truss design drawings. Truss design drawings, prepared in conformance to Section R802.10.1,
shall be provided to the building official and approved prior to installation at the time of their inspection.
Truss design drawings shall be provided with the shipment of trusses delivered to the job site. Truss design
drawings shall include, at a minimum, the following information:
(No changes to items 1-12)
56
2024 Building Code Modification Index (11/3/2025 V.1)
Page 114 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 34
Code Section: Table R905.1.1(2) Underlayment application
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: Current high -wind underlayment requirements are prescriptive and may not reflect the
performance capabilities of modern materials. Removing this section allows evaluation based on the
actual performance rating of underpayments as s econdary moisture barriers, rather than mandating
specific installation methods. This encourages innovation, simplifies compliance, and ensures the focus
remains on tested results, not rigid procedures.
Modification:
***In Table R905.1.1(2) for asphalt shingles, the last column for “Areas Where Wind Design is Required in Accordance with
Figure R.301.2.1.1” is changed to match the requirements in the column for “Areas Where Wind Design is Not Required in
Accordance with Figure R. 301.2.1.1.
TABLE R905.1.1(2)
UNDERLAYMENT APPLICATION
Roof Covering: Asphalt Shingles
SECTION: R905.2
AREAS WHERE WIND DESIGN IS REQUIRED IN ACCORDANCE WITH FIGURE R301.2.1.1:
Underlayment shall be one of the following:
1. Two layers of mechanically fastened underlayment applied in the following manner: Apply a strip of
underlayment that is half the width of a full sheet parallel to and starting at the eaves, fastened
sufficiently to hold in place. Starting at the eave, apply full-width sheets of underlayment, overlapping
successive sheets half the width of a full sheet plus 2 inches. Distortions in the underlayment shall not
interfere with the ability of the shingles to seal. End laps shall be 4 inches and shall be offset by 6 feet.
2. A minimum 4 -inch-wide strip of self -adhering polymer modified bitumen underlayment complying
with ASTM D1970, installed in accordance with the manufacturer’s installation instructions for the
deck material, shall be applied over all joints in the roof decking. An approved underlayment complying
with Table R905.1.1(1) for the applicable roof covering shall be app lied over the entire roof over the
4-inch- wide membrane strips.
57
2024 Building Code Modification Index (11/3/2025 V.1)
Page 115 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
(page 2 of 2024 IRC 34 - Table R905.1.1(2))
3. A single layer of self-adhering polymer modified bitumen underlayment complying with ASTM D1970,
installed in accordance with the underlayment and roof covering manufacturer’s installation
instructions for the deck material, roof ventilation configuration and climate exposure of the roof
covering.
1. For roof slopes from 2 units vertical in 12 units horizontal (2:12), up to 4 units vertical in 12 units
horizontal (4:12), underlayment shall be two layers applied in the following manner: apply a strip of
underlayment that is half the width of a full sheet parallel to and starting at the eaves, fastened
sufficiently to hold in place. Starting at the eave, apply full-width sheets of underlayment, overlapping
successive sheets half the width of a full sheet plus 2 inches. Distortions in the underlayment shall not
interfere with the ability of the shingles to seal. End laps shall be 4 inches and shall offset by 6 feet.
2. For roof slopes of 4 units vertical in 12 units horizontal (4:12) or greater underlayment shall be one
layer applied in the following manner: underlayment shall be applied shingle fashion, parallel to and
starting from the eave and lapped 2 inches. Distortions in the underlayment shall not interfere with
the ability of the shingles to seal. End laps shall be 4 inches and shall be offset by 6 feet.
3. A single layer of self-adhering polymer modified bitumen underlayment complying with ASTM D1970,
installed in accordance with the underlayment and roof covering manufacturer’s installation
instructions for the deck material, roof ventilation configuration and climate exposure of the roof
covering.
58
2024 Building Code Modification Index (11/3/2025 V.1)
Page 116 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 35
Code Section: R905.2.8.5 Drip Edge
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 40 R905.2.8.5
IRC 2018 IRC 2018 27 R905.2.8.5
IRC 2015 IRC 2015 22 R905.2.8.5
Reason: Impractical—this process is very time intensive and is difficult to produce and enforce any
conformity. It is counterproductive and is trying to solve a non -issue. Jurisdictions have had to insert a
stand-alone inspection for this one phase of construction in many cases.
Modification:
R905.2.8.5 Drip edge. A drip edge shall be provided at eaves and rake edges of shingle roofs. Adjacent
segments of drip edge shall be overlapped not less than 2 inches (51 mm). Drip edges shall extend not less
than 1/4 inch (6.4 mm) below the roof sheathing and extend up back onto the roof deck not less than 2
inches (51 mm). Drip edges shall be mechanically fastened to the roof deck at not more than 12 inches
(305 mm) o.c. with fasteners as specified in Section R905.2.5. Underlayment shall be installed over the
drip edge along eaves and under the drip edge along rake edges. A drip edge shall be provided at eaves
and rake edges of asphalt shingle roofs where required by the manufacturer.
59
2024 Building Code Modification Index (11/3/2025 V.1)
Page 117 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 36
Code Section: Chapter 11 [RE] Energy Efficiency
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 41 Chapter 11
IRC 2018 IRC 2018 28 Chapter 11
IRC 2015 IRC 2015 22 Chapter 11
IRC 2012 IRC 2012 16 Chapter 11
IRC 2006 IRC 2006 27 Chapter 11
IRC 2003 IRC 2003 21 Chapter 11
Reason: The State of South Carolina has specific energy standards in statutory form (Re: Title 6, Chapter
9, Building Codes and Title 6, Chapter 10, Building Energy Efficiency Standard Act.). To eliminate any
possible conflicts concerning the insulation requiremen ts for single and two family residential buildings
between the International Residential Code and state law, Chapter 11 was deleted.
Modification:
(Chapter deleted without substitution).
CHAPTER 11 [RE]
ENERGY EFFICIENCY
The State of South Carolina has specific energy standards in statutory form (Re: Title 6, Chapter 9,
Building Codes and Title 6, Chapter 10, Building Energy Efficiency Standard Act). To eliminate any
possible conflicts concerning the insulation requirements for single and two family residential buildings
between the International Residential Code and state law, Chapter 11 was deleted.*
*All references to Chapter 11 in the Referenced Standards chapter and Index must also removed.
60
2024 Building Code Modification Index (11/3/2025 V.1)
Page 118 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 37
Code Section: M1411.9.1 Auxiliary and secondary drain systems
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: The language is removed because it creates confusion. It applies to a drain pan without a drain
line, yet it still requires a fitting intended for a drain line.
Modification:
M1411.9.1 Auxiliary and secondary drain systems. In addition to the requireme nts of Section M1411.9, a
secondary drain or auxiliary drain pan shall be required for each cooling or evaporator coil where damage to
any building components will occur as a result of overflow from the equipment drain pan or stoppage in the
condensate drain piping. Such piping shall maintain a minimum horizontal slope in the direction of discharge
of not less than 1/8 unit vertical in 12 units horizontal (1-percent slope). Drain piping shall be not less than 3/4-
inch (19 mm) nominal pipe size. One of the following methods shall be used:
1. An auxiliary drain pan with a separate drain shall be installed under the coils on which condensation
will occur. The auxiliary pan drain shall discharge to a conspicuous point of disposal to alert occupants
in the event of a stoppage of the primary drain. The pan shall have a minimum depth of 1.5 inches (38
mm), shall be not less than 3 inches (76 mm) larger than the unit or the coil dimensions in width and
length and shall be constructed of corrosion-resistant material. Galvanized sheet steel pans shall have
a minimum thickness of not less than 0.0236 -inch (0.6010 mm) (No. 24 Gage). Nonmetallic pans shall
have a minimum thickness of not less than 0.0625 inch (1.6 mm).
2. A separate overflow drain line shall be connected to the drain pan installed with the equipment. This
overflow drain shall discharge to a conspicuous point of disposal to alert occupants in the event of a
stoppage of the primary drain. The overflow drain line shall conn ect to the drain pan at a higher level
than the primary drain connection.
3. An auxiliary drain pan without a separate drain line shall be installed under the coils on which
condensation will occur. This pan shall be equipped with a water level detection device conforming to
UL 508 that will shut off the equipment served prior to overflow of the pan. The pan shall be equipped
with a fitting to allow for drainage. The auxiliary drain pan shall be constructed in accordance with Item
1 of this section.
4. A water-level detection device conforming to UL 508 shall be installed that will shut off the equipment
served in the event that the primary drain is blocked. The device shall be installed in the primary drain
line, the overflow drain line or the equipment -supplied drain pan, located at a point higher than the
primary drain line connection and below the overflow rim of such pan.
61
2024 Building Code Modification Index (11/3/2025 V.1)
Page 119 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 38
Code Section: M1411.12 Insulation of refrigerant piping
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 42 M1411.6
IRC 2018 IRC 2018 29 M1411.6
IRC 2015 IRC 2015 24 M1411.6
IRC 2012 IRC 2012 18 M1411.6
IRC 2006 IRC 2006 28 M1411.5
IRC 2003 IRC 2003 22 M1411.4
Reason: Section M1411.4 requires insulation of refrigerant lines to R 4. Further research is needed to
determine if this insulating product is commercially available. To qualify for R 4 additional insulation may
be required, which could limit the spaces in which refrigerant lines could be installed.
Modification:
M1411.12 Insulation of refrigerant piping. Piping and fittings for refrigerant vapor (suction) lines shall be
insulated with insulation having a thermal resistivity of not less than R-3 at least R 2.5 hr. ft 2 F/Btu and
having external surface permeance not exceeding 0.05 perm [2.87 ng/(s × m2 × Pa)] when tested in
accordance with ASTM E96.
62
2024 Building Code Modification Index (11/3/2025 V.1)
Page 120 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 39
Code Section: M1411.15 Locking access port caps
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 43 M1411.9
IRC 2018 IRC 2018 30 M1411.8
IRC 2015 IRC 2015 25 M1411.6
IRC 2012 IRC 2012 18 M1411.6
Reason: The section appears to solve a non-issue at an added cost to the consumer.
Modification:
(Section deleted without substitution)
M1411.15 Locking access port caps. Refrigerant circuit access ports located outdoors shall be fitted with
locking-type tamper-resistant caps or shall be otherwise secured to prevent unauthorized access.
63
2024 Building Code Modification Index (11/3/2025 V.1)
Page 121 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 40
Code Section: M1502.3 Duct termination
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 44 M1502.3
IRC 2018 IRC 2018 31 M1502.3
IRC 2015 IRC 2015 26 M1502.3
IRC 2012 IRC 2012 19 M1502.3
IRC 2006 IRC 2006 29 M1502.2
Reason: The three feet dimension is arbitrary and restrictive; the dimension is not a requirement of the
dryer manufacturers.
Modification:
M1502.3 Duct termination. Exhaust ducts shall terminate on the outside of the building. Exhaust duct
terminations shall be in accordance with the dryer manufacturer's installation instructions. If the
manufacturer's instructions do not specify a termination location, the exhaust du ct shall terminate not
less than 3 feet (914 mm) in any direction from openings into buildings, including openings in ventilated
soffits. Exhaust duct terminations shall be equipped with a backdraft damper. Screens shall not be
installed at the duct termination.
64
2024 Building Code Modification Index (11/3/2025 V.1)
Page 122 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 41
Code Section: M1502.4.2 Duct Installation
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 45 M1502.4.2
IRC 2018 IRC 2018 32 M1502.4.2
Reason: Due to the amount of dryer fires in the US every year, 15,000 according to the US Consumer
Product Safety Division, the requirement for adding three screws per joint to the exhaust vent of clothes
dryers is overly restrictive, impractical, and a threat to life safety. The amount of dryer fires in the US has
not been proven to be due to failure of the joints on vents, but has been proven to be due to an
accumulation of lint. Adding protrusions to any length into the dryer exhaust will not decrease the
probability of more accumulation. However, securing, scaling and supporting each side of the joint of a
no-vertical-exhaust will prevent the separation of joints.
Modification:
M1502.4.2 Duct installation. Exhaust ducts shall be supported at intervals not to exceed 8 feet (2438 mm)
and within 16 inches (406 mm) of each side of a joint that is not installed in a vertical orientation, 12 feet
(3658 mm) and shall be secured in place, making rigid contact with the duct at not less than 4 equally
spaced points or two-thirds contact if strap is used. All brackets or strapping must be noncombustible. The
insert end of the duct shall extend into the adjoining duct or fitting in the direction of airflow. The overlap
shall comply with Section M1601.4.2. Ducts shall not be joined with screws or similar devices that
protrude into the inside of the duct . Exhaust ducts joints shall be sealed in accordance with Section
M1601.4.1. and shall be mechanically fastened. Ducts shall not be joined with screws or similar fasteners
that protrude more than 1/8 inch (3.2 mm) into the inside of the duct . Where dryer exhaust ducts are
enclosed in wall or ceiling cavities, such cavities shall allow the installation of the duct withou t
deformation. The duct work may be ovalized as long as it terminates in an approved duct box. Minor
imperfections located on the duct, in areas other than along the seam, do not constitute a violation.
65
2024 Building Code Modification Index (11/3/2025 V.1)
Page 123 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 42
Code Section: M1502.4.6 Duct length
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 46 M1502.4.6
IRC 2018 IRC 2018 33 M1502.4.5
IRC 2015 IRC 2015 27 M1502.4.4
IRC 2012 IRC 2012 20 M1502.4.4
IRC 2006 IRC 2006 30 M1502.6
Reason: To coincide with the maximum duct length specified by most clothes dryer manufacturers.
Modification:
M1502.4.6 Duct length. The maximum allowable exhaust duct length shall be determined by one of the
methods specified in Sections M1502.4.6.1 through M1502.4.6.3. The maximum length of a clothes
dryer exhaust duct shall not exceed 35 feet (10668 mm) from the dryer location to the wall or roof
termination.
66
2024 Building Code Modification Index (11/3/2025 V.1)
Page 124 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 43
Code Section: M1503.6 Makeup air
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 47 M1503.6
IRC 2018 IRC 2018 34 M1503.6
IRC 2015 IRC 2015 28 M1503.4
Reason: Makeup air is not required for installations less than 400 cfm.
Modification:
M1503.6 Makeup air required. Where one or more gas, liquid or solid fuel -burning appliance that is
neither direct -vent nor uses a mechanical draft venting system is located within a dwelling unit's air
barrier, each exhaust system capable of exhausting in excess of 400 cubic feet per minute (0.19 m 3/s)
shall be mechanically or passively provided with makeup air at a rate approximately equal to the exhaust
air rate. Such makeup air systems shall be equipped with not fewer than one outdoor air duct and damper
complying with Section M1503.6.2.
Exception: Makeup air is not required for exhaust systems installed for the exclusive purpose of space
cooling and intended to be operated only when windows or other air inlets are open.
Exhaust hood systems capable of exhausting more than 400 cubic feet per minute (0.1 9 m 3 /s) shall be
mechanically or naturally provided with makeup air at a rate approximately equal to the exhaust air rate
more than 400 cubic feet (0.19 m3/s) per minute. Such makeup air systems shall be equipped with not less
than one outdoor air duct and damper. Each damper shall be a gravity damper or an electrically operated
damper that automatically opens when the exhaust system operates. Dampers shall be accessible for
inspection, service, repair and replacement without removing permanent construction or any other ducts
not connected to the damper being inspected, serviced, repaired or replaced.
67
2024 Building Code Modification Index (11/3/2025 V.1)
Page 125 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 44
Code Section: M1504.3 Exhaust Openings
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 48 M1504.3
IRC 2018 IRC 2018 35 M1504.3
Reason: Locating air exhaust openings (typically from bath exhaust fans) 3 or more feet (914 mm) away
from an operable window or door is impractical in the design of residential structures. This also brings the
exhaust air opening requirement in line with dryer vent duct termination in M1502.3.
Modification:
M1504.3 Exhaust openings. Air exhaust openings shall terminate as follows:
1. Not less than 3 feet (914 mm) from property lines.
2. Not less than 3 feet (914 mm) from gravity air intake openings, operable windows and doors
except where the exhaust opening is located not less than 1 foot (305 mm) above the gravity
air intake opening, operable windows and doors.
3. Not less than 10 feet (3048 mm) from mechanical air intake openings except where either of
the following apply:
3.1 The exhaust opening is located not less than 3 feet (914 mm) above the air intake opening.
3.2 The exhaust opening is part of a factory-built intake/exhaust combination
termination fitting installed in accordance with the fan manufacturer's instructions,
and the exhaust air is drawn from a living space.
4. In accordance with Section R303.5.2 and R303.6.
Exception: Bathrooms, water closets and shower spaces.
68
2024 Building Code Modification Index (11/3/2025 V.1)
Page 126 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 45
Code Section: M1601.4.1 Joints, Seams and Connections
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 49 M1601.4.1
IRC 2018 IRC 2018 36 M1601.4.1
IRC 2015 IRC 2015 29 M1601.4.1
Reason: The requirement to seal longitudinal duct joints and seams for commercial applications with static
pressure of 2 inches water column and greater. However, this should not apply to residential applicants
which operate at a much lower pressure, closer to 0.2 inches water column. One argument to seal all
seams and joints is so the duct system functions efficiently. However, whether the longitudinal joints and
seams are sealed or not on a low -pressure system has very little effect on system efficiency. To a muc h
greater degree, system efficiency is affected by factors outside of the installer’s influence. For example,
the duct system can be perfectly balanced at the time of the inspection, but the occupants set furniture
in front of registers, change the settings on the registers open and close doors, etc. Sealing the longitudinal
joints and seams will not make a noticeable difference in either the efficiency or the energy saved, making
the added time and cost unnecessary.
Modification:
M1601.4.1 Joints, seams and connections. Longitudinal and transverse joints, seams and connections in
metallic and nonmetallic ducts shall be constructed as specified in SMACNA HVAC Duct Construction
Standards --Metal and Flexible and NAIMA Fibrous Glass D uct Construction Standards . Joints,
longitudinal and transverse seams, and connections in ductwork shall be securely fastened and sealed
with welds, gaskets, mastics (adhesives), mastic-plus-embedded-fabric systems, liquid sealants or tapes.
Tapes and mastics used to seal fibrous glass ductwork shall be listed and labeled in accordance with UL
181A and shall be marked “181A -P” for pressure-sensitive tape, “181 A-M” for mastic or “181 A -H” for
heat-sensitive tape.
Tapes and mastics used to seal metallic and flexible air ducts and flexible air connectors shall comply
with UL 181B and shall be marked “181 B -FX” for pressure-sensitive tape or “181 BM” for mastic. Duct
connections to flanges of air distribution system equipment shall be sealed and mechanically fastened.
Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181B and shall be
marked 181B-C. Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25
mm) and shall be mechanically fastened by means of not less than three sheet -metal screws or rivets
equally spaced around the joint.
69
2024 Building Code Modification Index (11/3/2025 V.1)
Page 127 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
(page 2 of IRC 2024 45 - M1601.4.1)
Closure systems used to seal all ductwork shall be installed in accordance with the manufacturers'
instructions.
Exceptions:
1. Spray polyurethane foam shall be permitted to be applied without additional joint seals.
2. Where a duct connection is made that is partially without access, three screws or rivets shall
be equally spaced on the exposed portion of the joint so as to prevent a hinge effect.
3. For ducts having a static pressure classification of less than 2 inches of water column (500 Pa),
additional closure systems shall not be required for continuously welded joints and seams and
locking-type joints and seams. This exception shall not apply to snap-lock and button-lock type
joints and seams that are located outside of conditioned spaces.
70
2024 Building Code Modification Index (11/3/2025 V.1)
Page 128 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 46
Code Section: G2415.17.1 (404.17.1) Limitations
Proponent: Omega Flex, Inc.
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: Composite tubing (both pex-al-pex and pe-al-pe) is being sold in the United States for use in fuel
gas systems. The pex -al-pex material was evaluated by the NFPA 54 National Fuel Gas code committee
which did not approve it for fuel gas applications because the product lacks equivalency to proscribed
piping systems. It is, nonetheless, being presented to AHJs who are being asked to approve it for use as
an alternative material for use within buildings in the United States. Even though the evaluation services
report lists this section of the code limiting the material to outdoors below ground, several AHJs have
approved it for installation above grade within the building where it poses a potential hazard in the event
of a building fire. A characteristic it shares with plastic gas piping and the reason for this section.
Modification:
G2415.17.1 (404.17.1) Limitations. Plastic pipe and plastic composite piping including pex-al-pex and pe-
al-pe (where listed and approved) shall be installed outdoors underground only. Plastic pipe shall not be
used within or under any building or slab or be operated at pressures greater than 100 psig (689 kPa) for
natural gas or 30 psig (207 kPa) for LP-gas.
Exceptions:
1. Plastic pipe shall be permitted to terminate above ground outside of buildings where installed in
premanufactured anodeless risers or service head adapter risers that are installed in accordance
with the manufacturer’s instructions.
2. Plastic pipe shall be p ermitted to terminate with a wall head adapter within buildings where the
plastic pipe is inserted in a piping material for fuel gas use in buildings.
3. Plastic pipe shall be permitted under outdoor patio, walkway and driveway slabs provided that the
burial depth complies with Section G2415.12.
71
2024 Building Code Modification Index (11/3/2025 V.1)
Page 129 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 47
Code Section: G2418.2 Design and installation
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 50 G2418.2
IRC 2018 IRC 2018 37 G2418.2
IRC 2015 IRC 2015 30 G2418.2
IRC 2012 IRC 2012 21 G2418.2
Reason: To allow other support materials that have been used successfully for years.
Modification:
G2418.2 (407.2) Design and installation. Piping shall be supported with metal pipe hooks, metal pipe
straps, metal bands, metal brackets, metal hangers or building structural components suitable for the size
of piping, of adequate strength and quality, and located at intervals so as to prevent or damp out excessive
vibration. Piping shall be anchored to prevent undue strains on connected appliances and shall not be
supported by other piping. Pipe hangers and supports s hall conform to the requirements of MSS SP-58
and shall be spaced in accordance with Section G2424. Supports, hangers and anchors shall be installed
so as not to interfere with the free expansion and contraction of the piping between anchors. The
components of the supporting equipment shall be designed and installed so that they will not be
disengaged by movement of the supported piping.
72
2024 Building Code Modification Index (11/3/2025 V.1)
Page 130 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 48
Code Section: P2503.6 Shower liner test
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 51 P2503.6
IRC 2018 IRC 2018 38 P2503.6
IRC 2015 IRC 2015 31 P2503.6
IRC 2012 IRC 2012 22 P2503.6
Reason: To allow a simple test performed under typical conditions
Modification:
P2503.6 Shower liner test. Where shower floors and receptors are made watertight by the application of
materials required by Section P2709.2, the completed liner installation shall be tested. The pipe from the
shower drain shall be plugged watertight for the test. The floor and receptor area shall be filled with
potable water to a depth of not less than 2 inches (51 mm) measured at the threshold. Where a threshold
of not less than 2 inches (51 mm) in height does not exist, a temporary threshold shall be constructed to
retain the test water in the lined floor or receptor area to a level not less than 2 inches (51 mm) in depth
measured at the threshold. The water shall be retaine d The shower liner shall be tested to the lesser of
the depth of threshold or 2 inches (51 mm) and shall be operated at normal pressure for a test period of
not less than 15 minutes and there shall not be evidence of leakage.
73
2024 Building Code Modification Index (11/3/2025 V.1)
Page 131 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 49
Code Section: P2503.6 Shower liner test
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: Allows scheduling flexibility and avoids delays by letting builders choose the test stage, without
reducing safety or performance. Ensures compliance without disrupting construction flow.
Modification:
(Adds to modified language from IRC 2024 48)
P2503.6 Shower liner test. Where shower floors and receptors are made watertight by the application of
materials required by Section P2709.2, the completed liner installation shall be tested. The shower liner
shall be tested to the lesser of the depth of threshold or 2 inches (51 mm) and shall be operated at normal
pressure for a test period of not less than 15 minutes and there shall not be evidence of leakage. The
shower liner test shall be performed at the rough plumbing or at the final plumbing inspection at the
discretion of the builder.
74
2024 Building Code Modification Index (11/3/2025 V.1)
Page 132 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 50
Code Section: P2603.2.1 Protection against physical damage
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 53 P2603.2.1
Reason: Clarification
Modification:
P2603.2.1 Protection against physical damage. In concealed locations, where piping, other than cast-iron
or galvanized steel, is installed through holes or notches in studs, joists, rafters or similar members less
than 1 1/4 inches (31.8 mm) from the nearest edge of the member, the pipe shall be protected by steel
shield plates. Such plates shall cover the area of the pipe where the member is notched or bored, and shall
extend not less than 2 inches (51 mm) above sole plates and below top plates. Steel shield plates shall not
be secured with nails or screws, unless required by the manufacturer.
P2603.2.1.1. Shield Plates. Shield plates shall be of steel material having a thickness of not less
than 0.0575 inch (1.463 mm) (No. 16 gage).
75
2024 Building Code Modification Index (11/3/2025 V.1)
Page 133 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 51
Code Section: P2603.5 Freezing
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 54 P2603.5
IRC 2018 IRC 2018 39 P2603.5
IRC 2015 IRC 2015 32 P2603.5
Reason: Unusually restrictive
Modification:
P2603.5 Freezing. In localities having a winter design temperature of 32°F (0°C) or lower as shown in
Table R301.2 of this code, a water, soil or waste pipe shall not be installed outside of a building, in exterior
walls, in attics or crawl spaces, or in any other place subjected to freezing temperature unless adequate
provision is made to protect it from freezing by insulation or heat or both. Water service pipe shall be
installed not less than 12 inches (305 mm) deep and not less than 6 inches (152 mm) below the frost line.
76
2024 Building Code Modification Index (11/3/2025 V.1)
Page 134 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 52
Code Section: P2603.5 Freezing
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 55 P2603.5
Reason: Unusually restrictive
Modification:
(Adds to modified language from IRC 2024 51)
P2603.5 Freezing. In localities having a winter design temperature of 32°F (0°C) or lower as shown in
Table R301.2 of this code, a water pipe shall not be installed outside of a building, in exterior walls, in
attics or crawl spaces, or in any other place subjected to freezing temperature unless adequate provision
is made to protect it from freezing by insulation or heat or both. Water service pipe shall be installed not
less than 12 inches (305 mm) deep and not less than 6 inches (152 mm) below the frost line.
Exception: Water pipes that are installed on the warm in winter side of the building envelope, i.e.,
above the insulation line in a floor system or below the insulation line in an attic, do not need
additional pipe insulation.
77
2024 Building Code Modification Index (11/3/2025 V.1)
Page 135 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 53
Code Section: P2705.1 General
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 56 P2705.1
Reason: It has been decided that sealing a toilet/bidet to the floor would prevent witness to possible seal
leaks that may go undetected.
Modification:
P2705.1 General. The installation of fixtures shall conform to the following:
1. Floor-outlet or floor-mounted fixtures shall be secured to the drainage connection and to the floor,
where so designed, by screws, bolts, washers, nuts and similar fasteners of copper, copper alloy or
other corrosion-resistant material.
2. Wall-hung fixtures shall be rigidly supported so that strain is not transmitted to the plumbing system.
3. Where fixtures come in contact with walls and floors, the contact area shall be watertight.
Exception: Water closets and/or bidets shall not be required to be caulked to flooring surface.
4. Plumbing fixtures shall be usable.
5. Water closets, lavatories and bidets. A water closet, lavatory or bidet shall not be set closer than 15
inches (381 mm) from its center to any side wall, partition or vanity or closer than 30 inches (762 mm)
27 inches center-to-center between adjacent fixtures. There shall be a clearance of not less than 21
inches (533 mm) in front of a water closet, lavatory or bidet to any wall, fixture or door.
6. The location of piping, fixtures or equipment s hall not interfere with the operation of windows or
doors.
7. In flood hazard areas as established by Table R301.2, plumbing fixtures shall be located or installed
in accordance with Section R306.1.6.
8. Integral fixture -fitting mounting surfaces on manufactured plumbing fixtures or plumbing fixtures
constructed on site, shall meet the design requirements of ASME A112.19.2/CSA B45.1 or ASME
A112.19.3/CSA B45.4.
78
2024 Building Code Modification Index (11/3/2025 V.1)
Page 136 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 54
Code Section: P2705.1 General
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: The added exception allows greater design flexibility in tight spaces by permitting toilets and bidets
to be placed 12" from a shower or tub edge —areas where obstruction and access issues are minimal. This
helps optimize bathroom layouts in smaller homes without compromising functionality or safety. Removing
the lavatory from the spacing requirement in this context avoids unnecessary restrictions. Lavatories are often
placed adjacent to tubs or showers without access or usability issues, and the standard clearance in front still
ensures user comfort and code compliance.
Modification:
(Adds to modified language from IRC 2024 53)
P2705.1 General. The installation of fixtures shall conform to the following:
1. Floor-outlet or floor-mounted fixtures shall be secured to the drainage connection and to the floor, where
so designed, by screws, bolts, washers, nuts and similar fasteners of copper, copper alloy or other
corrosion-resistant material.
2. Wall-hung fixtures shall be rigidly supported so that strain is not transmitted to the plumbing system.
3. Where fixtures come in contact with walls and floors, the contact area shall be watertight.
Exception: Water closets and/or bidets shall not be required to be caulked to flooring surface.
4. Plumbing fixtures shall be usable.
5. Water closets, lavatories and bidets. A water closet, lavatory or bidet shall not be set closer than 15 inches
(381 mm) from its center to any side wall, partition or vanity or closer than 27 inches center-to-center
between adjacent fixtures. There shall be a clear ance of not less than 21 inches (533 mm) in front of a
water closet, lavatory or bidet to any wall, fixture or door.
Exception: toilets and bidets may have spaced 12” from its center to the edge of a shower or tub.
6. The location of piping, fixtures or equipment shall not interfere with the operation of windows or doors.
7. In flood hazard areas as established by Table R301.2, plumbing fixtures shall be located or installed in
accordance with Section R306.1.6.
8. Integral fixture -fitting mounting surfaces on manufactured plumbing fixtures or plumbing fixtures
constructed on site , shall meet the design requirements of ASME A112.19.2/CSA B45.1 or ASME
A112.19.3/CSA B45.4.
79
2024 Building Code Modification Index (11/3/2025 V.1)
Page 137 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 55
Code Section: P2708.4 Shower control valves
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 57 P2708.4
Reason: Unenforceable and ambiguous
Modification:
P2708.4 Shower control valves. Individual shower and tub/shower combination valves shall be balanced-
pressure, thermostatic or combination balanced -pressure/thermostatic valves that conform to the
requirements of ASSE 1016/ASME 112.1016/CSA B125.16 or ASME A112.18.1/CSA B125.1 . Shower
control valves shall be rated for the flow rate of the installed shower head. Such valves shall be installed
at the point of use. Shower and tub/shower combination valves required by this section shall be equipped
with a means to limit the maximum setting of the valve to 120°F (49°C), which shall be field adjusted in
accordance with the manufacturer's instructions to provide water at a temperature not to exceed 120ºF
(49°C). In-line thermostatic valves shall not be utilized for compliance with this section.
80
2024 Building Code Modification Index (11/3/2025 V.1)
Page 138 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 56
Code Section: P2713.3 Bathtub and whirlpool bathtub valves
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 58 P2713.3
Reason: New language is unenforceable and ambiguous. Reverts language back to 2018 IRC.
Modification:
P2713.3 Bathtub and whirlpool bathtub valves. Bathtubs and whirlpool bathtub valves shall have or be
supplied by a water -temperature-limiting device that conforms to ASSE 1070/ASME A112.1070/CSA
B125.70, except where such valve s are combination tub/shower valves in accordance with Section
P2708.4. The water-temperature-limiting device required by this section shall be equipped with a means
to limit the maximum setting of the device to 120ºF (49ºC), and, where adjustable, shall be field adjusted
in accordance with the manufacturer's instructions to prov ide hot water at a temperature not to exceed
120ºF (49ºC). Access shall be provided to water -temperature-limiting devices that conform to ASSE
1070/ASME A112.1070/CSA B125.70.
Exception: Access is not required for nonadjustable water -temperature-limiting d evices that
conform to ASSE 1070/ASM E A112.1070/CSA B125.70 and are integral with a fixture fitting,
provided that the fixture fitting itself can be accessed for replacement.
Hot water supplied to bathtubs and whirlpool bathtubs shall be limited to a tempe rature of not greater
than 120ºF (49ºC) by a water -temperature limiting device that conforms to ASSE 1070/ASME
A112.1070/CSA B125.70 or CSA B125.3 , except where such protection is otherwise provided by a
combination tub/shower valve in accordance with Section P2708.4.
81
2024 Building Code Modification Index (11/3/2025 V.1)
Page 139 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 57
Code Section: P2903.10.3 Fixture valves and access
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: Through-wall faucets often have limited access and are typically connected to a common supply
with an interior shutoff valve. Requiring individual shutoff valves at each through -wall fixture is
impractical and may require invasive wall modifications. Adding this exception aligns with standard
installation practices and maintains accessibility without unnecessary disruption or cost.
Modification:
P2903.10.3 Fixture valves and access. Shutoff valves shall be required on each fixture supply pipe to each
plumbing appliance and to each plumbing fixture other than through wall faucets bathtubs and showers.
Valves serving individual plumbing fixtures, plumbing appliances, risers and branches shall be accessible.
82
2024 Building Code Modification Index (11/3/2025 V.1)
Page 140 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 58
Code Section: P2903.11 Hose bibb
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 60 P2903.10
IRC 2018 IRC 2018 40 P2903.10
IRC 2015 IRC 2015 33 P2903.10
Reason: Unusually restrictive
Modification:
(Section deleted without substitution)
P2903.11 Hose bibb. Hose bibbs subject to freezing, including the “frostproof” type, shall be equipped
with an accessible stop -and-waste-type valve inside the building s o that they can be controlled and
drained during cold periods.
Exception: Frostproof hose bibbs installed such that th e stem extends through the building insulation
into an open heated or semiconditioned space need not be separately valved (see Figure P2903.11).
(Figure also deleted with section)
83
2024 Building Code Modification Index (11/3/2025 V.1)
Page 141 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 59
Code Section: P2904.2.4.2.1 Additional requirements for pendent sprinklers
Proponent: South Carolina Master Plumbers Association
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 62 P2904.2.4.2.1
Reason: To reconcile SC IRC P2904.2.4.2.1 to agree with NFPA 13D 8.2.5.1.4 that is considered to be equal
to SC IRC P2904. NFPA 13D -2016, 8.2.5.1.4: Where area of the fan blades encompass more than 50% of
the area of the plan view, the sprinkler shall be installed in accordance with 8.2.5.3. Cost analysis for this
modification: the cost of the residential sprinkler protection in the affected fan areas are reduced by as
much as 50% with no reduction in the effectiveness of the fire sprinkler performance.
Modification:
P2904.2.4.2.1 Additional requirements for pendent sprinklers. Pendent sprinklers within 3 feet (915
mm) of the center of a ceiling fan, surface mounted ceiling luminaire or similar object shall be considered
to be obstructed, and additional sprinklers shall be installed.
Exception: Pendent sprinklers within 3 feet (915 mm) of the center of a ceiling fan shall not be
considered to be obstructed if the total area of the fan blades do es not exceed more than 50
percent of the plan area view.
84
2024 Building Code Modification Index (11/3/2025 V.1)
Page 142 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 60
Code Section: E3601.7.3 Metering centers
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: Remove the word separate when referencing meter centers with two to six disconnecting means.
Requiring separate compartments for disconnecting means when these means of disconnect are grouped
together limits types of metering allowed in residential dwellings supplied by 400amp services as well as
types of meter centers allowed to be installed on residential single family town home construction. In
these situations, requiring separate compartments significantly increases cost of new home construction.
Modification:
E3601.7.3 Metering centers. A service with two to six disconnecting means in separate compartments of
a metering center or a metering center with a main service disconnecting means shall be permitted.
[230.71 (B), 230.72 (A)]
Exception: Disconnecting means installed as part of listed equipment and used solely for the following
shall not be considered a service disconnecting means:
1. Power monitoring equipment.
2. Surge-protective device(s).
3. Power-operable service disconnecting means. [230.71 (A)]
85
2024 Building Code Modification Index (11/3/2025 V.1)
Page 143 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 61
Code Section: E3606.5 Surge protection
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 66 E3606.5
Reason: Delete the entire section as the requirement does not cover low voltage systems, and cannot
provide complete coverage from surges outside of the incoming service line. This language would also
foster an unreasonable and unenforceable implied warranty. The additional costs do not justify any
potential benefits.
Modification:
(Section is deleted without substitution)
E3606.5 Surge protection. All services supplying one- and two-family dwelling units shall be provided with
a surge protective device (SPD) installed in accordance with Sections E3606.5.1 through E3606.5.3.
E3606.5.1 Location. The SPD shall be an integral part of the service equipment or shall be located
immediately adjacent thereto.
Exception: The SPD shall not be required to be located in the service equipment if located
at each next-level distribution equipment downstream toward the load.
E3606.5.2 Type. The SPD shall be a Type 1 or Type 2 SPD.
E3606.5.3 Replacement. Where service equipment is replaced, all of the requirements of this
section shall apply. [230.67]
E3606.5.4 Ratings. SPDs shall have a nominal discharge current rating (ln) of not less than 10 kA.
[230.67]
86
2024 Building Code Modification Index (11/3/2025 V.1)
Page 144 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 62
Code Section(s):
E3702.2 Branch-circuit ampere rating
E3702.3 Ten-ampere branch circuits
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: 10amp branch circuits for limited branch circuit loads will lead to post inspection code violations.
Homeowners who are not aware that they have a 10amp branch circuit supplying power to a lighting load
may add outlets to that branch circuit and therefore violate code. While adding the ability to use 10amp
over current protection on branch circuits for a limited basis, minimum size AWG circuit conductors from
Table E3702.15 (1) and E3702.15( 2) is equal to 15 amp over current protection, therefore leading to
additional opportunists for confusion and code violation.
Modification:
E3702.2 Branch-circuit ampere rating. Branch circuits shall be rated in accordance with the maximum
allowable ampere rating or setting of the overcurrent protection device. The rating for other than
individual branch circuits shall be 10, 15, 20, 30, 40 and 50 amperes. Where conductors of higher ampacity
are used, the ampere rating or setting of the spec ified over-current device shall determine the circuit
rating. (210.18)
E3702.3 Ten-ampere branch circuits. A 10-ampere branch circuit shall comply with the following:
1. A 10-ampere branch circuit shall be permitted to supply one or more of the following: lighting
outlets, dwelling unit exhaust fans on bathroom or laundry room lighting circuits, and a gas
fireplace unit supplied by an individual branch circuit.
2. A 10 -ampere branch circuit shall not supply receptacle outlets, fixed appliances except as
permitted for individual branch circuits, garage door openers and laundry equipment.
[210.23(A)(1) and (2)]
87
2024 Building Code Modification Index (11/3/2025 V.1)
Page 145 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 63
Code Section: E3802.4 In unfinished basements
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 67 E3802.4
IRC 2018 IRC 2018 42 E3802.4
IRC 2015 IRC 2015 35 E3802.4
Reason: Unusually restrictive
Modification:
E3802.4 In unfinished basements and crawl spaces. Where Type NM or SE cable is run at angles with joists
in unfinished basements and crawl spaces, cable assemblies containing two or more conductors of sizes 6
AWG and larger and assemblies containing three or more conductors of sizes 8 AWG and larger shall not
require additional protection where attached directly to the bottom of the joists. Smaller cables shall be
run either through bored holes in joists or on running boards. Type NM or SE cable installed on the wall of
an unfinished basement shall be permitted to be installed in a listed conduit or tubing or shall be protected
in accordance with Table E3802.1. Conduit or tubing shall be provided with a bushing or adapter that
provides protection from abrasion at the point where the cable enters and exits the raceway. The sheath
of the Type NM or SE cable shall ex tend through the conduit or tubing and into the outlet, device or
junction box not less than 1/4 inch (6.4 mm). The cable shall be secured within 12 inches (305 mm) of the
point where the cable enters the conduit or tubing. Metal conduit, tubing, and metal outlet boxes shall be
connected to an equipment grounding conductor complying with Section E3908.14. [334.15(C)]
88
2024 Building Code Modification Index (11/3/2025 V.1)
Page 146 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 64
Code Section(s):
E3901.4.2 Island and peninsular countertops and work surfaces
E3901.4.3 Receptacle outlet location
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: The original requirement mandating provisions for a future receptacle outlet —when one is not
otherwise required—is unnecessary and impractical. By adopting the updated NEC -based language that
clearly defines when and where receptacle outlets must be installed on islands and peninsulas, we ensure
adequate access to power based on actual layout and usage, rather than speculative future needs. This
approach provides code clarity, improves design flexibility, and removes an ambiguous and unenforceable
obligation, while still maintaining electrical safety and functionality.
Modification:
E3901.4.2 Island and peninsular countertops and work surfaces . Receptacle outlets, if installed to serve
an island or peninsular countertop or work surface, shall be installed in accordance with Section
E3901.4.3. If a receptacle outlet is not provided to serve an island or peninsular countertop or work
surface, provisions shall be provided at the island or peninsula for future addition of a receptacle outlet
to serve the island or peninsular countertop or work surface.
E3901.4.2 Island and peninsular countertops and work spaces. Receptacle outlets shall be installed in
accordance with the following: [210.52(C)(2)]
1. At least one receptacle outlet shall be provided for the first 6 feet (1829 mm) of length, or fraction
thereof, of the countertop or work surface. A minimum of two receptacle outlets shall be provided
for any island over 6 feet (1829 mm) long.
2. At least on e receptacle outlet shall be located within 2 feet (600 mm) of the outer end of a
peninsular countertop or work surface. Additional receptacle outlets shall be permitted to be
located as determined by the installer, designer or building owner. The location of the receptacle
outlets shall be in accordance with Section E3901.4.3. [210.52(C)(2)(b)]
89
2024 Building Code Modification Index (11/3/2025 V.1)
Page 147 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
(page 2 of IRC 2024 64 - E3901.4.2 & E3901.4.3)
E3901.4.3 Receptacle outlet location. Receptacle outlets rendered not readily accessible by appliances
fastened in place, appliance garages, sinks, or rangetops as covered in the exception to Section E3901.4.1,
or appliances occupying assigned spaces shall not be considered as these required outlets. Required
receptacle outlets shall be located in one or more of the following:
1. On or above, but not more than 20 inches (508 mm) above, the countertop or work surface.
2. In a countertop using receptacle outlet assemblies listed for the use in countertops.
3. In a work surface using receptacle outlet assemblies listed for use in work surfaces or listed for use in
countertops. [210.52(C)(3)]
E3901.4.3 Receptacle outlet location. Receptacle outlets rendered not readily accessible by appliances
fastened in place, appliance garages, sinks, or rangetops as covered in the exception to Section E3901.4.1,
or appliances occupying assigned spaces shall not be considered as these required outlets. Required
receptacle outlets shall be located in one or more of the following:
1. On or above, but not more than 20 inches (508 mm) above, the countertop or work surface.
2. Receptacle outlet assemblies listed for the use in countertops or work surfaces shall be permitted
to be installed in countertops or work surfaces.
3. Not more than 12 inches (305 mm) below t he countertop or work surface. Receptacles installed
below a countertop or work surface shall not be located where the countertop or work surface
extends more than 6 inches (152 mm) beyond its support base. [210.52(C)(3)]
90
2024 Building Code Modification Index (11/3/2025 V.1)
Page 148 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 65
Code Section: E3902 Ground-fault and Arc-fault Circuit Interrupted Protection
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 70 E3902
Reason: The amendment removes the requirements for AFCI devices for residential dwelling units,
including one- and two-family homes. Reasoning includes cost savings, citing that families who cannot
qualify to purchase homes due to the increased costs from mandatory code requirements, such as AFCIs,
will have to live in housing that is less safe, because that hous ing was built to less stringent code
requirements. The total cost to homebuyers to install AFCIs is over $430,000,000 per year —24 times the
cost of damage per year, and it is clear that requiring AFCIs in new construction will not prevent all
damage. This is due to the fact that AFCIs cannot prevent all fires and, more importantly, that electrical
fires occur overwhelmingly in older houses. From 1980 to 2015, there has been a significant drop in the
number of reported fires, injuries and fatalities in the U S. Both the number of fires and fatalities have
dropped by approximately 50%, even as the population increased. The decline was sharpest during the
1980s, before AFCIs were introduced. This further supports the importance of encouraging homeowners
to move up to newer homes without the added burden of increased regulation.
Modification:
Entire section E3902.1 - E3902.22 modified to remove “through 250 volt” from text.
SECTION E3902
GROUND-FAULT AND ARC-FAULT CIRCUIT-INTERRUPTER PROTECTION
91
2024 Building Code Modification Index (11/3/2025 V.1)
Page 149 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 66
Code Section: E3902.5 Basement receptacles
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 71 E3902.5
Reason: A finished basement is not noted as a wet areas and their addition is not needed or required.
Modification:
(Adds to modified language from IRC 2024 65)
E3902.5 Basement receptacles. 125-volt receptacles installed in basements and supplied by single -
phase branch circuits rated 150 volts or less to ground shall have ground -fault circuit -interrupter
protection for personnel. [210.8(A)(5)]
Exceptions:
1. Receptacles in walk-out basements are excluded from this requirement.
92
2024 Building Code Modification Index (11/3/2025 V.1)
Page 150 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 67
Code Section: E3902.12 Specific appliance outlets
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: Removing additional ground fault protection for specific outlets as this requirement is redundant
for most of these specific branch circuits, while also creating opportunity for nuisance tripping on
additional branch circuits not previously covered. Removing the requirements for GFI protection from the
above code section, aligns GFI protection with modifications from 2021 South Carolina IRC.
Modification:
E3902.12 Specific appliance outlets Ground-fault circuit-interrupter protection shall be provided for the
branch circuit or outlets supplying the following appliances rated 150 volts or less to ground and 60
amperes or less, single- or three-phase:
1. Drinking water coolers and bottle fill stations.
2. High-pressure spray washing machines.
3. Sump pumps.
4. Dishwashers.
5. Electric ranges.
6. Wall-mounted ovens.
7. Counter-mounted cooking units.
8. Clothes dryers.
9. Microwave ovens. [210.8(D)]
93
2024 Building Code Modification Index (11/3/2025 V.1)
Page 151 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 68
Code Section: E.3902.14 Outdoor Outlets
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
NEC 2020* NEC 2020 04 210.8(F)
*This was previously tied to a 2020 NEC modification that was amended with the 2024 code adoption process to
also include the IRC.
Reason: It has not been determined if all A/C condenser units will operate on a GFCI -protected circuit as
sufficient testing has not been conducted. In addition, branch circuit extensions or modifications would
require the addition of GFCI protection for old condens er units, and it is not known whether the existing
equipment is compatible with GFCI.
Modification:
E3902.14 Outdoor outlets. All outdoor outlets, including outlets installed in the following locations, and
supplied by single -phase branch circuits rated 150 volts or less to ground, 50 amperes or less, shall be
provided with GFCI protection:
1. Garages that have floors located at or below grade level.
2. Accessory buildings.
3. Boathouses.
Exceptions:
1. GFCI protection shall not be required on lighting outlets other than those covered in Section
210.8(F) of NFPA 70.
2. GFCI protection shall not be required for receptacles that are not readily accessible and are
supplied by a branch circuit dedicated to electric snow -melting, deicing, or pipeline an d vessel
heating equipment where such equipment is protected as required by NFPA 70.
3. GFCI protection shall not be required for listed HVAC equipment. This exception shall expire
September 1, 2026. [210.8(F)]
94
2024 Building Code Modification Index (11/3/2025 V.1)
Page 152 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 69
Code Section: E3902.21 Arc-fault circuit interrupter protection.
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 71 E3902.17
IRC 2018 IRC 2018 44 E3902.16
Reason: No accurate SC-specific data substantiates a need for AFCI. Data collected over a 12 -year period
(2002-2023) shows that there was an estimated average of 0.6 civilian deaths per year in fires caused by
electrical arcing in one- and two-family homes, and an estimated total of five civilian injuries. An average
of 19 fires were caused annually by electrical arcing, and the average annual total damage from fires
caused by electrical arcing in both prope rty and contents adjust to 2013 dollars was $438,349. The costs
association with AFCI don’t even take into account the added expense of nuisance trips. Due to these and
other findings, 29 states have either removed or made amendments to AFCI and GFCI provi sions.
Mandating costly incremental increases in safety will not only protect those who can afford them, and will
often decrease safety for those who cannot.
Modification:
E3902.21 Arc-fault circuit interrupter protection. In areas other than kitchen and laundry areas, Bbranch
circuits that supply 120 -volt, single-phase, 10-, 15- and 20- ampere outlets installed in kitchens, family
rooms, dining rooms, living rooms, parlors, librarie s, dens, bedrooms, sunrooms, recreations rooms,
closets, hallways, laundry areas and similar rooms or areas shall be protected by any of the following:
[210.12(A)]
(language in items 1 - 6 unchanged by modification)
95
2024 Building Code Modification Index (11/3/2025 V.1)
Page 153 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 70
Code Section: E4002.11 Bathtub and shower space
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: Replacing the 3' dimension measured horizontally from the edge of the bathtub or shower to 27"
measured horizontally matches the plumbing modification for plumbing code P2705.1 General. This
modification aligns electrical and plumbing requirements for the dimensions between adjacent fixtures.
Modification:
E4002.11 Bathtub and shower space.
Receptacles shall not be installed inside of the tub or shower within a zone measured 3 feet (914 mm) 27
inches horizontally from the outside edge of the bathtub or shower stall, including the space outside the
bathtub or shower stall space below the zone. The zone also includes the space measured vertically from
the floor to 8 feet (2438 mm) above the top of the bathtub rim or shower stall threshold. The identified
zone is all -encompassing and shall include the space directly over the bathtub or shower sta ll and the
space below this zone, but not space separated by a floor, wall, ceiling, room door, window, or fixed
barrier. [406.9(C)]
Exceptions:
1. Receptacles installed in accordance with Section E4209.4 shall be permitted. [406.9(C) Exception No. 1]
2. In bathrooms with less than the required zone, the receptacle(s) required by Section E3901.6 shall be
permitted to be installed opposite the bathtub rim or shower stall threshold on the farthest wall in the
room. [406.9(C) Exception No. 2]
3. Weight-supporting ceiling receptacles (WSCR) shall be permitted to be installed for listed luminaires that
employ a weight -supporting attachment fitting (WSAF) in damp locations complying with Section
E4003.11. [406.9(C) Exception No. 3]
4. A single receptacle shall be permitted fo r an electronic toilet or personal hygiene device such as an
electronic bidet seat. The receptacle shall be readily accessible and not located in the space between the
toilet and the bathtub or shower. [406.9(C) Exception No. 4]
96
2024 Building Code Modification Index (11/3/2025 V.1)
Page 154 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 71
Code Section: E4002.14 Tamper-resistant receptacles
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 75 E4002.14
Reason: This amendment retains the provisions of the 2017 NEC. It was added in the 2008 NEC and is not
based on sound technical information which adequately substantiates that it will result in protecting small
children from burns or injury. Concerns were raised over the comprehensiveness of the studies used to
substantiate this amendment, as well as how the elderly community would be able to use the tamper -
resistant receptacles due to the amount of force required to be applied to insert the plugs.
Modification:
E4002.14 Tamper-resistant receptacles. In areas specified in Section E3901.1, 15- and 20-ampere,
125- and 250-volt nonlocking-type receptacles shall be listed tamper-resistant receptacles. [406.12]
Exception: Receptacles in the following locations shall not be required to be tamper resistant:
1. Receptacles located more than 5.5 feet (1676 mm) above the floor.
2. Receptacles that are part of a luminaire or appliance.
3. A single receptacle that is not readily accessible that supplies a single appliance or a duplex
receptacle that is not readily accessible and supplies two appliances where such receptacles are
located in spaces occupied by or designated for the appliances served and, under conditions of
normal use, the appliances are not easily moved from one place to another. The appliances shall
be cord -and-plug-connected to such receptacles in accordance with Section E3909.4. [406.12
Exception]
97
2024 Building Code Modification Index (11/3/2025 V.1)
Page 155 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 72
Code Section: Chapter 44 Referenced Standards
Proponent: Air-Conditioning, Heating and Refrigeration Institute
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 76 Chapter 44
Reason: The 2022 standards from the original modification request in 2021 are now referenced
throughout. However, the below sections were not added to the IRC reference standards.
Modification:
UL/CSA 60335-2-40—2022: Household and Similar Electrical Appliances—Safety—Part 2-40: Particular
Requirements for Electrical Heat Pumps, Air-Conditioners
and Dehumidifiers
M1402.1, M1403.1, M1412.1, M1413.1, and M2006.1
98
2024 Building Code Modification Index (11/3/2025 V.1)
Page 156 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 73
Code Section: Chapter 44 Referenced Standards
Proponent: Daikin Comfort Technologies Manufacturing, Inc.
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: This is tied to modification IMC 2024 02:
Errors exist in Table 1103.1 of the 2024 IMC, which came from the 2022 edition of ASHRAE 34. These
errors have been corrected in the 2024 edition of ASHRAE 34, but are not reflected in Table 1103.1 of the
2024 IMC. The changes hav e been approved for the 2027 IMC using ASHRAE 34 -2024 as the referenced
standard in Chapter 15, and those change are reflected in ICA – TSG-000001 – Toto – ASHRAE – 2024 IMC.
This proposal is to correct those incorrect values within the Table in accordance with ASHRAE 34-2024.
Modification:
ASHRAE 34—2022 2024: Designation Classification of Refrigerants
M1411.1
99
2024 Building Code Modification Index (11/3/2025 V.1)
Page 157 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 74
Code Section: Appendix BF Patio Covers
Proponent: Structural Engineers Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 77 Appendix AH
IRC 2018 IRC 2018 45 Appendix H
IRC 2015 IRC 2015 36 Appendix H
IRC 2012 IRC 2012 25 Appendix H
Reason: To provide minimum requirements for patio covers for the protection of people and property.
Modification:
Appendix BF, Patio Covers, is adopted for use statewide.
100
2024 Building Code Modification Index (11/3/2025 V.1)
Page 158 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 75
Code Section: Appendix BO Existing Buildings and Structures
Proponent: Structural Engineers Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 78 Appendix AJ
IRC 2018 IRC 2018 46 Appendix J
IRC 2015 IRC 2015 37 Appendix J
Reason: To provide guidance for renovating, modifying or updating residential structures in applying the
IRC and to help with uniform enforcement of the IRC on renovation projects across the state.
Modification:
Appendix BO is adopted for use statewide.
101
2024 Building Code Modification Index (11/3/2025 V.1)
Page 159 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Residential Code
Modification Index Number: IRC 2024 76
Code Section: Appendix BB Tiny Houses
Proponent: Building Officials Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 79 Appendix AQ
IRC 2018 IRC 2018 47 Appendix Q
Reason: Jurisdictions will have more options and flexibility to approve small home construction.
Modification:
Appendix BB is adopted for use statewide.
102
2024 Building Code Modification Index (11/3/2025 V.1)
Page 160 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Fire Code
Modification Index Number: IFC 2024 01
Code Section: 202 General Definitions – Primitive camp structure
Proponent: Building Officials Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IFC 2021 IFC 2021 02 202
IFC 2018 IFC 2018 02 202
Reason: “Structures primarily used or associated with outdoor camping activities” include, but are not
limited to, shelters, tree stands, sheds, rustic cabins, campfire shelters, shelters, tents, tepees, or other
indigenous huts used only for campers or program participants, or used in conjunction with outdoor
camping activities such as hiking, fishing, hunting, or nature appreciation, regar dless of material used for
construction. These structures are not to include utilities such as mechanical, electrical or plumbing.
Modification:
R02 General Definitions
Primitive Camp Structure. Shall include any structure permanent or temporary in nature, used for outdoor
camping (transient), open on at least one side with no fully enclosed habitable spaces, less than 400 square
feet under roof, and not classified as a residential occupancy due to lack of electrical, plumbing, mechanical,
and sprinkler systems.
103
2024 Building Code Modification Index (11/3/2025 V.1)
Page 161 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Fire Code
Modification Index Number: IFC 2024 02
Code Section: 202 General Definitions – Recreational fire
Proponent: South Carolina Fire Marshals Association
Previous Code Cycles Previous Modification Number Previous Code Section
IFC 2021 IFC 2021 04 202
IFC 2018 IFC 2018 01 202
IFC 2015 IFC 2015 01 202
IFC 2012 IFC 2012 01 202
Reason: The definition of sky lanterns is being proposed to be added to the IFC. The Office of the State Fire
Marshal is regularly asked for clarification regarding these devices and how they are being addressed in the
IFC. The language in the code for “recreational fire” could be interpreted to exclude sky lanterns. These
devices are a serious threat to property and are a life safety hazard. Their use presents a fire hazard caused
by their release with no means of control. A sky lantern can achieve great height and distance from its
launch area. The final destination is undetermined and these sky lanter ns have been known to cause
uncontrolled fires.
Modification:
R02 General Definitions
Recreational Fire. An outdoor fire burning materials other than rubbish where the fuel being burned is not
contained in an incinerator, outdoor fireplace, portable outd oor fireplace, barbeque grill or barbeque pit
and has a total fuel area of 3 feet (914 mm) or less in diameter and 2 feet (610 mm) or less in height for
pleasure, religious, ceremonial to include sky lanterns, cooking, warmth or similar purposes.
104
2024 Building Code Modification Index (11/3/2025 V.1)
Page 162 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Fire Code
Modification Index Number: IFC 2024 03
Code Section: [BG] 203.2.8 Assembly Group A-3
Proponent: Building Officials Association of South Carolina (BOASC)
Previous Code Cycles Previous Modification Number Previous Code Section
IRC 2021 IRC 2021 03 202
IFC 2018 IFC 2018 03 202
Reason: Add to the listing of A-3 occupancies the following use: Structures, without a commercial kitchen,
used in agritourism activity as defined by S.C. Code Ann. 46-53-10(1).
Modification:
203.2.8 Assembly Group A -3. Group A -3 occupancy includes assembly uses intended for worship,
recreation or amusement and other assembly uses not classified elsewhere in Group A including, but not
limited to:
Amusement arcades
Art galleries
Bowling alleys
Community halls
Courtrooms
Dance halls (not including food or drink consumption)
Exhibition halls
Funeral parlors
Greenhouses for the conservation and exhibition of plants that provide public access
Gymnasiums (without spectator seating)
Indoor swimming pools (without spectator seating)
Indoor tennis courts (without spectator seating)
Lecture halls
Libraries
Museums
Places of religious worship
Pool and billiard parlors
Structures, without a commercial kitchen, used in agritourism activity as defined by S.C. Code Ann. 46-53-
10(1)
Waiting areas in transportation terminals
105
2024 Building Code Modification Index (11/3/2025 V.1)
Page 163 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Fire Code
Modification Index Number: IFC 2024 04
Code Section: 315.3.3 Equipment rooms
Proponent: Midlands Fire Marshal Association
Previous Code Cycles Previous Modification Number Previous Code Section
IFC 2021 IFC 2021 05 315.3.3
Reason: This would permit the authority having jurisdiction to have the owner/occupant label the rooms
as “No storage allowed.”
Modification:
315.3.3 Equipment rooms. Combustible material shall not be stored in boiler rooms, mechanical rooms,
elevator machine rooms, electrical equipment rooms or in fire command centers as specified in Section
508.1.5. Rooms shall be labeled with approved signage "No storage allowed".
106
2024 Building Code Modification Index (11/3/2025 V.1)
Page 164 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Fire Code
Modification Index Number: IFC 2024 05
Code Section: 503.1.2 Additional access
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IFC 2021 IFC 2021 08 503.1.2
Reason: To add an exception that permits fire apparatus access roads to be a driveway, pathway, or other
approved surface that creates a fire lane not accessible to motor vehicles.
Modification:
503.1.2 Additional access. The fire code official is authorized to require more than one fire apparatus access
road based on the potential for impairment of a single road by vehicle congestion, condition of terrain,
climatic conditions or other factors that could limit access.
Exception: Where two fire apparatus access roads are required by Section 503.1.2, the additional
fire apparatus access road is permitted to be a driveway, pathway, court or other approved fire lane
not accessible to public motor vehicles, where designed by a registered design professional to meet
the loading requirements and minimum specifications of Section 503, and the surface provides all-
weather driving capabilities. Marking or signs shall be provided in accordance with Section 503.3 and
Section D103.6.
107
2024 Building Code Modification Index (11/3/2025 V.1)
Page 165 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Fire Code
Modification Index Number: IFC 2024 06
Code Section: 503.2.1 Dimensions
Proponent: Home Builders Association of South Carolina
Previous Code Cycles Previous Modification Number Previous Code Section
IFC 2021 IFC 2021 10 503.2.1
IFC 2018 IFC 2018 05 503.2.1
IFC 2015 IFC 2015 04 503.2.1
IFC 2012 IFC 2012 04 503.2.1
Reason: To retain the current means by which fire apparatus access and road dimensions are measured.
Modification:
503.2.1 Dimensions. Fire apparatus access roads shall have an unobstructed width of not less than 20 feet
(6096 mm) exclusive of shoulders, except for approved security gates in accordance with Section 503.6 and
an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm).
108
2024 Building Code Modification Index (11/3/2025 V.1)
Page 166 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Fire Code
Modification Index Number: IFC 2024 07
Code Section: 507.1 Required water supply
Proponent: Charleston Fire Department
Previous Code Cycles Previous Modification Number Previous Code Section
IFC 2021 IFC 2021 11 507.1
IFC 2018 IFC 2018 06 507.1
Reason: This modification attempts to provide clarity . Previous modifications to this section caused
confusion regarding the specific application. The information regarding the location and spacing of fire
hydrants is now addressed in IFC Section 507.5.1.
Modification:
507.1 Required water supply. An approved water supply capable of supplying the required fire flow for fire
protection shall be provided to premises on which facilities, buildings or portions of buildings are hereafter
constructed or moved into or within the jurisdiction to meet the necessary fire flow as determined by the
fire code official. Where public water supply is inadequate or not available, an approved alternative water
source meeting the fire flow requirements shall be provided. Fire flow performance tests shall be witnessed
by the fire code official or representative prior to final approval.
Exception: One- and two-family dwellings, including attached or detached accessory structures.
109
2024 Building Code Modification Index (11/3/2025 V.1)
Page 167 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Fire Code
Modification Index Number: IFC 2024 08
Code Section: 507.5.1 Where required
Proponent: Charleston Fire Department
Previous Code Cycles Previous Modification Number Previous Code Section
IFC 2021 IFC 2021 12 507.5.1
IFC 2018 IFC 2018 07 507.5.1
Reason: A previous modification for hydrant spacing merged multiple sections of the code and caused
confusion between IFC 507.1 and 507.5.1. This modification attempts to remove some of the confusion,
return to the numbering in the base code, and place the modifications within the appropriate sections while
providing clear direction.
Modification:
507.5.1 Where required. Where a portion of the facility or building hereafter constructed or moved into or
within the jurisdiction is more than 400 feet (122 m) 500 feet (152m) from a hydrant on a fire apparatus
access road, as measured by an approved rout e around the exterior of the facility or building, on -site fire
hydrants and mains shall be provided where required by the fire code official.
Location. The location and number of hydrants shall be designated by the fire official, but in no case shall
the distance between installed fire hydrants exceed 1000 feet (305 m). Fire hydrants shall be located within
500 feet (152 m) of all fire fighter access points when measured along the normal routes of fire department
vehicle access which conforms to the requi rements of Section 503. No point of the exterior of a building
shall be located more than 500 feet (152 m) from a hydrant accessible to fire department vehicles as
provided in Section 503.
Exceptions:
1. For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183 m).
2. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance
with Section 903.3.1.1 or 903.3.1.2, the distance requirement shall be 600 feet (183 m).
110
2024 Building Code Modification Index (11/3/2025 V.1)
Page 168 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Fire Code
Modification Index Number: IFC 2024 09
Code Section: 507.5.1.1 Hydrant for standpipe systems
Proponent: Midlands Fire Marshal Association
Previous Code Cycles Previous Modification Number Previous Code Section
IFC 2021 IFC 2021 13 507.5.1.1
Reason: Adds fire sprinkler systems to this section.
Modification:
507.5.1.1 Hydrant for standpipe systems. Buildings equipped with a standpipe or fire sprinkler system
installed in accordance with Section 903 or 905 shall have a fire hydrant within 100 feet (30 480 mm) of the
fire department connections.
Exception: The distance shall be permitted to exceed 100 feet (30 480 mm) where approved by the fire
code official.
111
2024 Building Code Modification Index (11/3/2025 V.1)
Page 169 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Fire Code
Modification Index Number: IFC 2024 10
Code Section: 507.5.4 Obstruction
Proponent: Midlands Fire Marshal Association
Previous Code Cycles Previous Modification Number Previous Code Section
IFC 2021 IFC 2021 14 507.5.4
Reason: This is already a state traffic violation. Adding mirrored language to this section allows fire code
officials to enforce this violation as well. State traffic law states, SC Title 56-5—3530: Stopping, standing or
parking prohibited in specific places; exceptions.
Modification:
507.5.4 Obstruction. Unobstructed access to fire hydrants shall be maintained at all times. The fire
department shall not be deterred or hindered from gaining immediate access to fire protection equipment
or fire hydrants. No parking shall be allowed within 15 feet (4572 mm) of a fire hydrant.
112
2024 Building Code Modification Index (11/3/2025 V.1)
Page 170 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Fire Code
Modification Index Number: IFC 2024 11
Code Section: 606.3.3.2 Grease accumulation
Proponent: Midlands Fire Marshal Association
Previous Code Cycles Previous Modification Number Previous Code Section
N/A
Reason: This request intends to provide a direct reference to NFPA 96 for all operational and maintenance
requirements for commerc ial cooking systems. This proposal will made code enforcement by fire code
officials more consistent between the IFC and NFPA standards, as all requirements would be sourced from
the same document. NFPA 96 is currently a nationally recognized and reference d fire safety standard with
limited including in the IFC, and is not directly referenced for the specific purpose of operations and
maintenance. The code requirements for new construction and installation of commercial cooking systems
would still be in accordance with the South Carolina Building Code and the South Carolina Mechanical Code,
as is current practice. Based on the “scoping” of Section 606.3, there would be no conflict between new
construction installation requirements.
Modification:
606.3.3.2 Grease accumulation. If during the inspection it is found that hoods, grease -removal devices,
fans, ducts or other appurtenances have an accumulation of grease, such components shall be cleaned in
accordance with ANSI/IKECA C10 and NFPA 96. The cleanings shall be completed by a properly trained and
qualified company or person(s) acceptable to the authority having jurisdiction. The individual or company
performing the inspections and cleaning shall indicate their certifications to the authority having jurisdiction
upon request.
113
2024 Building Code Modification Index (11/3/2025 V.1)
Page 171 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Fire Code
Modification Index Number: IFC 2024 12
Code Section: 607.1 General
Proponent: Midlands Fire Marshal Association
Previous Code Cycles Previous Modification Number Previous Code Section
IFC 2021 IFC 2021 16 607.1
Reason: The intention is for the types of tanks referenced in this code section to have the contents
identified as outlined in Sections 5003.5, 5003.5.1 and NFPA 30.
Modification:
607.1 General. Storage of cooking oil (grease) in commercial cooking operations utilizing above -ground
tanks with a capacity greater than 60 gal (227 L) installed within a building shall comply with Sections 607.2
through 607.7 and NFPA 30. For purposes of this section, cooking oil shall be classified as a Class IIIB liquid
unless otherwise determined by testing. These tanks shall have the contents identified as outlined in
Section 5703.5.
114
2024 Building Code Modification Index (11/3/2025 V.1)
Page 172 of 221
South Carolina Department of Labor, Licensing and Regulation
South Carolina Building Codes Council
2024 Modification Index
Applicable Code: 2024 International Fire Code
Modification Index Number: IFC 2024 13
Code Section: 901.6.3 Records
Proponent: Charleston Fire Department
Previous Code Cycles Previous Modification Number Previous Code Section
IFC 2021 IFC 2021 19 901.6.3
IFC 2018 IFC 2018 08 901.6.3
Reason: Fire protection system reports are a critical component of maintaining a life safety system to
protect the public and first responders. Receiving, reviewing, and following up on deficient reports is an
important element of a comprehensive risk redu ction strategy for any community. The current reporting
method in the referenced code requires the serving vendor to leave a report with a responsible party on
site. These reports are often lost, misplaced, and never followed through to completion. By providing a path
for the information to flow to the jurisdiction, as required, we provide the local officials with a way to
monitor the operational conditions of these systems and improve the safety of our local communities.
Modification:
901.6.3 Records. Records of a
Text truncated. Open the original for the full document.
Source: Beaufort County website. First collected Oct 24, 2026.