RecordWell Data

Packet and Exhibits Combo

Edgefield County · Edgefield County · meeting of Oct 11, 2023 · Agenda packets

Open the original document More from Edgefield County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Edgefield County Planning Commission County Council Chambers October 12, 2023 Work Session 5:00 PM Meeting 6:00 PM Chair: James Burt – Dist. I Vice-Chair: Lisa Whitaker-Dist. III Daniel Baker – At Large Tracy Walsh – At Large Rhonda Nowicki – Dist. II Sharon Hadden– Dist. V Karlene Butler – Dist. IV The next Planning Commission Meeting is scheduled for November 09, 2023 Table of Contents Work Session Agenda ........................................................................ 3 LD Memorandum ............................................................................... 5 Meeting Agenda ............................................................................... 14 September 14, 2023 Work Session Minutes .................................... 16 September 14,2023 Meeting Minutes ............................................. 26 3 Edgefield County Planning Commission Work Session Agenda County Council Chambers October 12, 2023 5:00 PM This agenda may be modified at any time prior to or during the meeting described herein. The meeting may begin after the advertised start time if a reasonable adjustment to the advertised start time is needed for any reason. I. Call to Order II. Guest Speakers Representative from Trotter General to answer questions regarding Land Development Application / Dollar General proposed on Tax ID 146-04-01-0031-000. III. Old Business a) Continued discussion on recommended revisions to county ordinance ch.24 Sec. 24-252 (including Sec. 24-248, 251,285, and 286) b) Final discussion before vote and Public Hearing regarding changes to County Ordinance CH. 24 Sec. 24-29 and the County’s Comprehensive Plan. IV. New Business a) Review of the Land Development Application submitted by Trotter General. The proposed is a Dollar General retail store to be located on the corner of Edgefield Rd and Trailside Dr. in North Augusta baring tax ID# 146-04-01-031-000. b) Review & discussions regarding the proposed zoning of certain parcels of land from Stephens Rd in North Augusta to Indian Ridge in North August c) Discuss the proposed creation of new zoning district to be implemented on parcels of land running from Stephens Rd in North Augusta to Indian Ridge in North Augusta. 4 V. Adjourn To watch the Planning Commission Work-Session live: Subscribe to our YouTube Account – Edgefield County Government. You can be notified of upcoming live streams. The next Planning Commission Meeting is scheduled for November 9, 2023 The Planning Commission is scheduled to meet on the second Thursday of each month at 5:00 p.m. for a work session and at 6:00 p.m. for the meeting at the Edgefield County Council Chambers, located at 225 Jeter St., Edgefield, SC. These meetings are subject to prior cancelation or change. The public will be notified of any cancelation or change. Individuals requiring special assistance or a sign interpreter to participate in the meeting are asked to please notify the Building & Planning Department 48 hours prior to the meeting at (803) 637 - 4073. Any questions regarding the Planning Commission should be directed to the County’s Planner April Morgan Amorgan@e dgefieldcounty.sc.gov 5 Memorandum To: Edgefield County Planning Commission From: April Morgan, Edgefield County Planner Date: October 5, 2023 Re: Land Development Application (Dollar General) Applicant: Trotter General LLC Property Owner: Jason Fox/Fox Springs, LLC Property Address: TBT (or) Location: Corner of Edgefield Road & Trailside Dr. North Augusta Parcel ID: 146-04-01-031-000 Property Size: 2.84 Land Use: Vacant Zoning: GC (General Commercial) Proposed Use: Commercial Sewer/Septic: ECWSA Water: ECWSA Council District: District 2 Fire District: Merriweather Land Development Description The current owner Fox Springs, LLC, has granted permission to Trotter General, to make application for the proposed Land Development of the above-mentioned property. Trotter General LLC, is proposing the development of a commercial building, to be utilized as a Doller General Store. This site is located on Edgefield Road in North Augusta at the corner of Edgefield Road and Trailside Dr. The proposed consist of the following: o 2.84 acres total property area o 1.70 acres to be developed o 0.80 acres of impervious surface o 2.04 (72%) greenspace o A 10, 640 sf retail store/commercial building o 31 parking spaces provided (2 being handicap) o Concrete delivery pad o Concrete dumpster pad area w/ shadowbox, fence, and gates o Ingress and egress located off of Trailside Dr. 6 Compliance with County Land Development Ordinances The location of the proposed development has a zoning designation of GC (General Commercial). As sighted in the Edgefield County Code of Ordinances Sec. 24-29 (4) GC General Commercial Development District, “This district is to provide for a wide variety of retail and service uses to satisfy the common and frequent needs of residents in large sections of the county. This district supports most commercial uses including uses that require outdoor storage or dispensing systems. Proposed residential uses in this district are required to have larger lots and must meet the requirements of section 24-107 , buffer yards. As sighted in section 24-29 (h) (1) (2) requires 1 loading space for this 10,640sf structure. As sighted in the Edgefield County Code of Ordinance 24-31miscellaneous retail is a permitted use in GC (General Commercial) Zoning making the proposed in compliance under permitted use. The proposed commercial building is compliant with GC Zoning lot area, setback, height, and density requirements. The proposed commercial building (Dollar General) is classified as Minor Land Development as sighted by the Edgefield County Code of Ordinances Sec. 24-242 “Minor land development" is any commercial, industrial, institutional, or other nonresidential land development or land altering activity requiring a permit from the county other than a subdivision or major land development.” Other requirements • Sec 24-32 in GC zoning there is no maximum building size for commercial • Sec 24-32 in GC zoning No limits; however, buildings in excess of 40 feet in height shall observe an additional setback from side and rear property lines of one foot for each one foot in height over 40 feet. NOTE: The proposed is 18’ in height • Set Back Requirements (Low Impact Commercial) Set back on the south/south east portion & west portion are 30. Set back on the Eastern portion facing Edgefield Road is 45’. Setbacks of property bordering Trailside Dr are 25’ • Sec 24-29 (4) of Edgefield County Ordinance HOD Highway Overlay District will apply as well as Hwy 25 Overlay requirements as listed in the Edgefield County Comprehensive Plan. 7 Other Than a Subdivision application process. • P ermitted Use in Zoning District -Compliant • Minimum Lot area requirements in Zoning District -Compliant • Application process for Land Development -Compliant Compliance with County Comprehensive Plan • Permitted Land Use - Compliant Approval by Other Regulatory Entities • Trotter General LLC, has consulted with required regulatory entities for the development of the proposed commercial building (Dollar General) that have been marked Approved. If approved by the Planning Commission approval by those entities will be needed before construction as sighted in the Edgefield County Code of Ordinances Sec. 24-252 “(a) No building permit shall be issued for a shopping center; apartment or condominium complex; commercial, business, or industrial park; manufactured home park; or other multi-use or multi-occupant project, unless and until an applicant for such use submits to the planning administrator the following: (1) A plat and/or site plan with date and scale, showing the actual shape and dimensions of the lot to be built upon; the size, height, and location on the lot of existing and proposed buildings and structures; the intended use of each building, the number of units the building is designed to accommodate; storm water analysis and control plan, flood and wetland areas; proposed parking, driveways, street ROW and interior circulation pattern, proposed buffer-yard, open space and landscaping; building elevations; and contiguous off-site development. (2) Grading, erosion and sediment control plan. (3) All required permits of other state and local agencies.” • DHEC Storm Water / Sediment Control • D HEC Wastewater Approval • E CWSA Tap Approval • E lectric Utility • SCDOT Encroachment • Other Regulatory Entities - SWEPPP Provided - ECWSA - Pending - Pending -Pending NA PLEASE NOTE: Regulatory Entities marked as PENDING approval does NOT mean they are not compliant. It simply means that once a project obtains the County’s approval after a Preliminary Hearing, verification of compliance provided by that regulatory entity must be submitted to the County Planning Department prior to construction. Without documentation of compliance form that Entity, the project may not move forward. 8 Planning Commission Action The Planning Commission needs to hold a vote on Preliminary plat (plan) approval for the proposed commercial building (Dollar General). As sighted in the Edgefield County Code of Ordinances Sec. 24-252 “(b) The planning commission shall hear and evaluate the application in relation to the following design and improvement criteria. (1) Ingress and egress to the project site shall be designed to maximize automotive and pedestrian safety and facilitate traffic flow. (2) Off-street parking, off-street loading, refuse, and service areas shall be designed to minimize their visual and physical impact on neighboring property. (3) Street right-of-way and pavement construction shall be adequate to accommodate the type and volume of traffic anticipated. (4) The project shall be designed in harmony with its physical surroundings and in such a manner as to ensure land use compatibility. (c) If, upon review of these standards, the project is determined to be in-compliance, the planning commission shall approve the land development application and cause the issuance of a building permit” Following Public hearing, the Planning Commission may vote on the Land Development Application for Trotter General. The proposal will receive automatic approval on November 12,2023 if no decision is reached by that time unless both applicant and the Planning Commission agree to an extension. As sighted in Edgefield County Ordinances Sec. 24-82 (3) “The Planning Commission shall review and evaluate the application and plans at this hearing. They will either approve the plans as presented, request additional information, approve a modified plan or disapprove the plan”. 9 Land Development Area Aerial: (Image, Streets, Property red outline) Land Use: (Land Use name under picture) Zoning: (same as aerial with zoning) 10 Land Development Property (same as aerial but also addresses) 11 Land Development Preliminary Plan 12 Buffer-Yard: Shown is a 30’ Landscaped Buffer-yard NOTE: For Commercial/ Table 3 & 4 in Ch. 24 Sec. 24-107, require no more than a type 3 Buffer-yard Agriculture – 0 Single-Family Dwelling RD-Zoning-Type 3 Single-Family Dwelling- Type 2 All other residential uses- Type 1 Office/Institutional- none Commercial/ Non-Effluent Industrial- 0 Effluent Producing Industry- none Street- Type 1 13 See Buffer-yard table on next page Table 4 Bufferyard Plant Requirements Type Bufferyard Width Plants per 100 Feet 1 5 feet 2 large trees 2 small trees 6 shrubs 2 10 feet 3 large trees 4 small trees 12 shrubs 3 15 feet 4 large trees 6 small trees 24 shrubs 4* 25 feet 6 large trees 8 small trees 36 shrubs 5* 50 feet 8 large trees 12 small trees 54 shrubs 14 Edgefield County PLANNING COMMISSION Meeting Agenda County Council Chambers October 12, 20223 6:00 PM This agenda may be modified at any time prior to or during the meeting described herein. A vote may be held on all agenda items. The meeting may begin after the advertised start time if a reasonable adjustment to the advertised start time is needed for any reason VI. Call to Order A. Invocation B. Pledge VII. Approval of Agenda A. Approval of October 12,2023 Meeting Agenda VIII. Approval of Minutes A. Approval of September 14,2023 Work Session Meeting Minutes IX. Guest Speaker(s) Trotter General/Applicants of the Land Development Application for parcel 146-04-01-031-000 /Proposed Dollar General available for questions X. Public Hearing This portion of Planning Commissions regular Meeting allows for comments from citizens regarding Public Hearing items on the Agenda during the regular meeting. Citizens may sign up to speak on these matters. Interested citizens may sign up to speak on a list maintained by the County Planner prior to the meeting. Each citizen shall be eligible to speak for a maximum of 5 minutes. All citizens wishing to speak during the public hearing shall be subject to recognition by the presiding officer and shall address the presiding officer directly. Written comments may be submitted to the County Planner prior to the meeting which will be read during the Public Hearing Comment Section. 15 XI. Reports from Staff No reports by staff XII. Old Business a) Vote regarding recommended changes to County Ordinance 24-29 b) Vote regarding changes to the County’s Comprehensive Plan XIII. New Business a. Vote regarding Land Development Application submitted by Trotter General for a proposed Dollar General retail store to be located at the corner of Edgefield Road and Trailside Dr in North Augusta (Tax ID # 146-04-01-031-000) XIV. Executive Session No Executive Session XV. Comments by the Planning Commission Chair XVI. Adjourn To watch the Planning Commission Meeting live: Subscribe to our YouTube Account – Edgefield County Government. You can be notified of upcoming live streams. The next Planning Commission Meeting is scheduled for November 9, 2023 The Planning Commission is scheduled to meet on the second Thursday of each month at 5:00 p.m. for a work session and at 6:00 p.m. for the meeting at the Edgefield County Council Chambers located at 225 Jeter St., Edgefield, SC. These meetings are subject to prior cancelation or change. The public will be notified of any cancelation or change. Individuals requiring special assistance or a sign interpreter to participate in the meeting are asked to please notify the Building & Planning Department 48 hours prior to the meeting at (803) 637 - 4073. Any questions regarding the Planning Commission should be directed to the County’s Planner April Morgan Amorgan@edgefieldcounty.sc.gov 16 Edgefield County PLANNING COMMISSION Work Session Minutes County Council Chambers September 14, 2023 5:00 PM The Edgefield County Planning Commission Work Session was held on Thursday September 14th, 2023, at the Edgefield County Council Chambers at 225 Jeter Street in Edgefield at 5:00pm. Notice of the time date and agenda of this meeting was provided to The Edgefield Advertiser, placed on the Message Board outside Council Chambers, and provided to others when requested. Any questions regarding the Planning Commission should be directed to the County’s Planner April Morgan Amorgan@edgefieldcounty.sc.gov Members present: Fab Burt, Lisa Whitaker, Karleen Butler, Rhonda Nowicki, Sharon Hadden, Tracy Walsh Members absent: Daniel Baker Staff present: April Morgan, Dharma Williams, Hart Clark County Council members present: No County Council Members Guest Speakers: No Guest Speakers 17 N o votes held during work session. I. Call to Order B urt called the meeting to order at 5:00 pm. II. Guest Speakers No guest speakers III. Old Business B urt begins the meeting that the commissioners will continue discussion regarding suggested changes to Edgefield County’s Comprehensive Plan and ordinances. During this meeting, Commissioners will review suggested changes as well as identify agreed upon items that are ready for Public Hearing and vote. Items ready for vote will be placed on the October Agender for Planning Commission’s Work Session and Regular Meeting. C lark explains that he would like to go through the changes section by section and if the commissioners decide they are good with the change with want it to go forward they will raise their hand and if they decide that they are not okay with the changes or want to continue discussion then they will not raise their hand. He explains that if there is something in the text specifically that needs to be changed it can be briefly discussed so that it can move forward. S ection 24-252, Land development other than a subdivision is for commercial properties (not PUD’s, subdivisions, etc.) that is not an industrial park, manufactured home park, or multi use project - such as a general store- will only go to Planning Commission if not administratively approved by Planning Staff, in which the case it can be appealed by the Planning Commission. He explains that this will prevent the public from feeling unheard at public meetings as they legally have to be approved as they are allowed by right whether the public likes it or not. 18 Nowicki clarifies that past items, such as the Frito-Lay project or dog kennels, would no longer come to planning commission or have a public hearing. She explains that this public hearing gives the public knowledge to where they can do things such as protest, like the Woodlawn Road wedding venue where the man backed out due to protests. Walsh and Hadden agree that the public hearing gives public a chance to express their opinion and let them know what is going on in the County as well as informing the representatives of said project that their project is not wanted by the public. Hadden says that the transparency to public is very important. Clark continues to explain that the public hearing could have people show up but be angry because it gets approved anyways as it is allowed by right, and he is trying to prevent this problem. He says that yes, the public being able to voice their opinion is great but that it also creates anger in the public which he wants to prevent. Walsh explains that we should continue these public hearings to educate the public and let them feel as if they are heard and to express their opinions and at the public hearing the Commissioners can say to the public that they hear the concerns of the public but that legally it has to be accepted. Whitaker says that we cannot think that just because a business will move in somewhere and that the public will have an outcry, that they will not have any business. The number of people that may have an outcry will be far outnumbered by the people who may want that business. She explains that the commissioners cannot say that the business will fail because the ten people who show up to the public hearing and do not want it, while there may be a hundred people who do not show up who may want it. Walsh agrees but also says that transparency is very important in the County. Whitaker asks if the approved items would go to County Council. Clark explains that no, the regular land development applications do not go to County Council to be approved unless there is a change to the law, such as a PUD. Whitaker agrees that we need to be transparent but that public hearings can get the public very angry and riled up over something that will happen whether they like it or not. Clark explains that he will put this section to the side to be talked about more. 19 Clark continues to section 24-29, Establishment and purpose of zoning districts. He says that there was a change to extend the Highway Overlay District to West Martintown Road from the Aiken County Line to the intersection of Old Martintown Road and the intersection of Briggs Road, Martintown Road, W Martintown Road, and Woodlawn Road and this is primarily to prevent signage problems in commercial properties. He says the other major throughout this document is changing “Zoning Administrator” to “Planning Department” throughout the document to make it to where he and Morgan can both make changes and approvals. Walsh first asks if Murrah Road Extension was still included in this, to which Clark replies yes due to the apartment complex as at the time they did not have green space requirement. There is then discussion on where the line for North Augusta is which would be where our overlay would end. Walsh then clarifies that she was under the impression that West Martintown Road was extended from Aiken County Line to Big Oak Drive. Clark explains that she is right, and he will correct that. Clark continues to the last change in Section 24-29 where he added the table for Buffer Yard Requirements for the Highway Overlay District. He made non-aesthetically pleasing uses, such as industries having a class five overlay district, must be behind a buffer. He says the Buffer Yard requirement has not changed, only been applied to the Overlay District and given each use their own requirements. Walsh explains that she had concerns with the temporary signage with a light on it, and that she is aware that this section is only for the Highway Overlay District, but that she would like to talk about real estate or rent signs being eliminated from the illuminated sign topper for dark areas. She passed a picture around to show an example of when she, as a real estate agent, is trying to find these types of signs in areas with no street lights. She also asks if this can be allowed County Wide. Clark explains that if okay with other commissioners he could eliminate this sign from the limitations of having a sign topper in this District and that for other parts of the County there are not restrictions on this, but for the Highway Overlay District signage is much stricter. Walsh also says that in section G there is a section that says signs offering tenant space. She asks if that means a single room space in a house or a house for rent. She says that if this is the case it should not be a sign in the window but a yard sign. 20 Clark clarifies that this is for multi-use buildings, such a strip mall, having a room for rent putting the rent sign in the window of the room being rented. This is not for residential. Clark confirms that everybody is okay with changes in this section with the noting of the signage changes. Nowicki clarifies that we will hold off on the entire section 24-252, and Clark confirms that we will continue discussion and hold off on that section because when sending changes to County Council he wants for the entire section to be finished. Walsh questions about the minimum requirement of land being 15 acres for a PD application. She says that this does not seem like much land, Clark explains that it has been increased from 5 acres to 15 acres. Clark further explains that this is just the minimum that should be looked at during the application, but that we could look at setting it higher if wanted by commissioners. Burt expresses that he believes 15 acres is fine. Walsh expressed that she has a hard time imagining a PD on only 15 acres of land, and Clark reminds her that a PD is any multi use that is not allowed by the zoning. For example, in a GC district applying for a strip mall with one building with ten units with one use not allowed in GC, this would be considered a PD. Nowicki explains that our PD’s are not legal according to state law. Clark explains that the state law has PUD’s and PD and many jurisdictions have three or four different variations of a PD so he would not say that our PD is not legal, but rather it is not the same Planned Development as what is being referred to as in the state law. Nowicki states that the state law requires commercial, Clark explains that this is for a planned unit development, and Nowicki says that she does not think that they differentiate between the PD and a PUD in the state law there is only one definition. Clark explains that she is correct but that the only time that this has been challenged was in Charleston and the only reason that it was challenged was because they were using a PD to get around the zoning requirements. They wanted to put lot sizes that were smaller than what was required in the zoning districts. As long as you are not using a PD as just a means to get around the existing zoning, for example Tavern Hill was on un-zoned land and did not require any type of zoning but chose to zone it for regulations to be set in stone for the future when they no longer have their hands in it. 21 Nowicki asks what the lot size was where Windsor is at. Clark explains that he is not sure about the lot size but that there were two different zoning categories on that properties which is why they applied for a PUD there so that they could have a more uniform zoning. Nowicki asks if the lots became smaller when they applied for a PUD, to which Clark explains that a good portion was un-zoned so there was no minimum lot size requirement so they could have made the lot sizes even smaller while a portion was zoned GD so the minimum lot sizes would have been quarter acre lot sizes at that time and another portion was zoned RD which would have been around 10,000-12,000 square feet minimums (about six units per acre). Walsh says that the point was that the state law says that those are requires to have a mix use of residential and commercial. Clark says right but if you approve a PUD that does not conflict with the law what is the conflict what would be the problem. Walsh says would you be meeting state law allowing that. Hart explains that you would just be creating a zoning district, and that you could create a zoning district right now saying that there are minimum five acre lot sizes with no other requirements and call it whatever you want to. He reminds the commissioners that the creation of a PUD is the creation of an ordinance and it has to go through the same process of creating any other law. He explains that you could call it a PD, a residential PD, a zoning district XYZ, whatever you want to when creating a new zoning district and as long as it is not conflicting another law then it is not a problem. Walsh asks if the state law does not say that you have to have mixed use. Clark says that “the state law says that for a Planned Use Development (PUD), basically what it is saying is that if you have a situation where you have an area that has clearly defined laws and a developer applies for a change to those zonings that is a planned devolvement and you should have a commercial element or a mixed use commercial element inside of that development because you cannot use that law as a way to get around the zoning that is already on the property. Basically, it is saying that you can’t use it to get around a conflict in the law”. Walsh says “But we can conflict the state law by saying that PD’s can be residential”. Clark explains that if there is nothing to conflict with it is not a conflict. Walsh reminds Clark that she is talking about the PD/PUD being mixed use. Clark gives an example of somebody buying a property and bringing it to Planning Commission asking for it to be zoned. He gives a hypothetical situation of creating a zoning called Windsor Zoning X3. Clark explains that there is no law stating that we cannot create that zoning, and that we could make an entire custom zoning ordinance that would be passed onto County Council to be voted upon to be passed into the law and it would be perfectly legal as long as it does not conflict with any existing laws. He explains that you cannot create an ordinance that conflicts with an existing law just as a way to get around the already applied as 22 that would open you up to a conflict and a lawsuit. However if there were no laws there in place to conflict with that would just be creating a zoning district there would be no conflict. Walsh explains “ I understand that if they are not conflicting with County Ordinances- County Laws when they put that and plan that zone but if state law says that state wide PD’s/PUDS have to be mixed use then when we put in a PD and we don’t have a mixed use isn’t that in conflict with the state law?” Clark explains “No, only if it is conflicting with something that is already present. That would be the only time it conflicts with the state law. Otherwise you are just creating a custom zoning district, that is all you are doing.” Morgan explains that back when we held our joint meeting Roger LeDuc actually touched on that topic. A PUD, Planned Unit Development, according to state law does require a mixed use. What County Council has adopted as an Ordinance is a Planned Development. He explained at this meeting that the PD’s which the County adopted does not include the Commercial aspect. Walsh explains “I had another attorney explain to me that there no difference between a PD and a PUD other than a name”. Clark says that she could ask the attorney about creation of General Residential Districts with these same rules and if these would be okay, and continues to explain that the attorney would agree that this would be okay because the County has the ability to zone and if it is on un-zoned property and you are putting zoning on it for the first time there cannot be a conflict no matter what you create because there is nothing for it to conflict with. Walsh states “So we do not have to follow the state law that says it was intended for mixed use”. Clark responds “If somebody applied for a PD in a zoned area and the only reason the applied was because something in there was not allowed by the zoning that was there, they would have to meet the state law for a Planned Development”. Walsh confirms that this is when they would have to meet the state law, and that she is just trying to understand when the state law has to be met. Clark says “Right, because otherwise they are just trying to get around a lot size requirement and the state has ruled in court that you cannot use it for that purpose”. Walsh confirms “I think you finally answered my question”. Nowicki asks if it is a PD in a zoned area and the zoned area says that the lot sizes are a two acre minimum, they cannot do a PD because it is a conflict. Clark explains that they cannot do a PD unless they meet the requirement of the state law, but if it is in an un-zoned area and there are no areas of conflict then you would not be doing a PD but rather creating a zoning district. Clark uses Sharps Overlook as an example. He explains that they applied for a PD in an area where our Comprehensive Plan and zoning did not allow it, his recommendation to the commissioners was to approve it on the condition that they meet our requirements, they refused to comply with that, they went to County Council and got denied. Clark explains that this is the way that it is supposed to work. 23 Clark confirms with commissioners that we will not continue discussion on this section. Clark begins to review changes in Comprehensive Planning starting with the Census changes from 2010 to 2020. Commissioners confirm they are okay with this change. Clark explains the change made to table 7.3 changing the language to match precisely to the Categories found above the table. Commissioners confirm they are okay with this change. Clark continues to change made at table 7.4. He explains that in rural agriculture he took commercial uses out of allowed and moved it to conditional use. He also took small lot residential from conditional and moved it to not allowed. Next in estate residential small lot residential was removed from condition and moved to not allowed. The next change was in suburban density residential, the word density was removed to match the rest of the document. All of the rest of the changes were the same matching the language to the rest of the document. Commissioners confirm they are okay with this change. Clark continues to the Zoning and Development categories, where he removed General Development and added General Residential and General Commercial and continued to reflect these changes in the definitions of the categories. He explains that this really just means that he updated this section to match our current zoning. Commissioners confirm they are okay with this change. Walsh questioned if we could add chart showing what zoning categories would be appropriate in which land use categories for the public’s knowledge which Clark confirms he will add as table 7.5. Clark continues to the Highway Overlay District where he reflected the changes discussed previously, showing that item 2 being changes from Murrah Road Extension to Sweetwater Road and item 3 being changed from Five Notch Road to Big Oak Drive. Clark also explains that he added items 5 which is West Martintown Road from the Aiken County Line to the intersection of Old Martintown Road and item 6 which is the intersection at Briggs Road. Commissioners confirm they are okay with this change. Calrk continues to the zoning overlay changes. He explains that he changed the language for the Sweetwater zoning overlay as it had more of a residential overlay which it was decided that you (the commissioners) wanted more of a commercial overlay. The language 24 was changed to match the existing commercial overlay conditions. Commissioners confirm they are okay with this change. Clark continues to the change on the Martintown Road Overlay which he left the same but removed the architectural control concerning fencing. Commissioners confirm they are okay with this change. Clark tells the final change of removing the Town of Edgefield Growth Area Overlay and the Town of Johnson Growth Area Overlay. Commissioners confirm they are okay with this change. Nowicki asks about recreation and green space requirements and explains that a retention pond should not be considered a part of the green space. Clark explains that detention ponds can not be a part of the green space as it is fenced off land while retention pond would be just like a pond in your land and shows where in the definition section in the County Ordinances the definitions of green space, retention ponds, and detention ponds are explained for reference. He explains that a detention pond had to be fenced off as it could be a hazard. Walsh explains that she still cannot imagine a PD as being a minimum of 15 acres. Clark explains that this is because she is imagining a PD as only residential developments, which is not always the case as a PD could possibly be as small as a one building facility. He explains that we could increase this and if somebody gets denied based on the fact of not meeting the minimum land requirement, they could come to Planning Commission to request approval. Walsh expressed concerns about green space being turned into housing down the road and asks if we could put something into the Comprehensive Plan where the County would be handed over the property to be sure that no housing would be added as when another Planning Commission or County Council comes into the picture, they may not keep require these developers to keep the previously required green space as green space. Clark clarifies that while this could be recommended, he does not believe that County Council would accept this due to liability. He explains that this type of situation is in perpetuity and talks about a case where recently in Planning somebody bought a buffer yard from a tax sale and tried to sell a piece of this buffer yard and got denied by planning staff with the concerns that they would have to go back through the Planning Commission or County Council process before being approved. He explains that there is no way to lock things like this into place for hundreds of years to go. 25 IV. New Business No new business V. Adjourn Burt put the work Session to Adjourn at 6:01 pm. 26 Edgefield County PLANNING COMMISSION Meeting Minutes County Council Chambers September 14, 2023 6:01 PM The Edgefield County Planning Commission Meeting was held on Thursday September 14, 2023 in the Edgefield County Council Chambers at 225 Jeter Street in Edgefield at 6:01pm. Notice of the time date and agenda of this meeting was provided to The Edgefield Advertiser, posted on the message board outside of Council Chambers, and provided to others when requested. Any questions regarding the Planning Commission should be directed to the County’s Planner April Morgan Aprilmorgan@edgefieldcounty.sc.gov Members present: Fab Burt-Chairman. V, Lisa Whitaker-Dist. III, Karlene Butler-Dist. IV, Rhonda Nowicki Dist. II, Tracy Walsh-At Large, Sharron Haden Dist. V Members absent: Daniel Baker At Large Staff present: April Morgan-Planner, Dharma Williams-Planning Staff, Hart Clark-Zoning Administrator, Andrew Marine-County Attorney County Council members present: No County Council Members Present Guests Speakers: 27 No Guest Speakers Present I. Call to Order Chairman Fab Burt called the meeting to order at 6:01 pm. A. Invocation Burt gave an invocation. B. Pledge Burt led the pledge of allegiance. II. Approval of Agenda A. Approval of September 14,2023 Meeting Agenda Walsh made a motion to approve the September 14,2023 agenda. Butler seconded the motion. Burt put the motion to a vote. All present voted in favor (6-0). Motion passed. III. Approval of Minutes A. Approval of August 10 ,2023 Work Session Meeting Minutes Whitaker made a motion to approve the August 10,2023 Work Session Meeting minutes. Butler seconded the motion. Burt put the motion to a vote. All voted in favor (6-0). Motion Passed. B. Approval of August 10 ,2023 Meeting Minutes Whitaker made a motion to approve the August 10,2023 Meeting minutes. Butler seconded the motion. Burt put the motion to a vote. Majority voted in favor (6-0). Motion Passed. IV. Guest Speakers No guest speakers V. Reports Windsor Planned Development has had preconstruction meeting for Phase Four and construction will begin. VI. Old Business No old business VII. New Business No new business VIII. Executive Session Planning Commission moved into an executive session with Andrew Marine, the County Attorney, for discussion regarding potential pending litigation concerning subdivision approvals. Whitaker makes a motion to move into Executive Session, Walsh seconds. Burt put the motion to a vote. All voted in 28 favor (6-0). Motioned was passed. Commissioners, Planning Staff, and County Attorney Marine moved into Executive Session, which concludes at 6:29. Burt explains that we have concluded the Executive Session with no votes being made. He asks for a motion to approve. Whitaker motions, Butler Seconds. Burt put the motion to a vote. All voted in favor (6-0). IX. Comments by the Planning Commission Chair No Comments Made X. Adjourn Table 7.5 Acceptable Zoning for Land Use Categories Land Use Category Acceptable Zoning Rural Agricultural RR, RD, GC, LC Estate Residential Recommended 2-acre lot size no matching zoning district currently Suburban Density Residential RR, RD Village Density Residential RR, RD, GR, LC Multi-Family Residential GC Neighborhood Commercial LC, GC Commercial / Mixed Use Activity Center LC, GC Recreation and Open Space1 Special Use District Institutional/Campus1 Special Use District Agribusiness/Light Industrial ID, RR Light Industrial/Office-Distribution GC, ID Heavy Industrial ID Public/TCU1 Special Use District Town & City (Out of Scope) Outside of County’s Scope New Zoning District Staff Example: Agriculture District Use Table Use Staff Recommended Uses Planning Commission County Council Sector 11: Agriculture, Forestry, Fishing and Hunting Agricultural production, crops P Agricultural livestock P Cattle ranching and farming P Hogs and pig farming P Poultry and eggs P Sheep and goat farming P Animal aquaculture P Animal specialties P Horses and other equine P General farms P Forestry and logging P Fishing, hunting, trapping P Agricultural services P Forestry P Sector 21: Mining Mining P Sector 22: Utilities Electric, gas, and sanitary services P Solar electric generation1 P Commercial electric generation1 P Electrical transmission P Natural gas distribution P Water supply systems P Storage/treatment P Water supply transmission P Sewerage systems P Sewage collection P Sewage treatment P Steam and air conditioning supply P Sector 23: Construction Building construction— General contract, operative builders P Heavy construction not building construction P Special trade contractors P Sectors 31—33: Manufacturing Food N Beverage and tobacco N Textile mills N Textile product mills N Apparel N Leather and allied products N Wood products N Paper N Printing and related activities N Petroleum products N Chemical products N Plastic and rubber products N Nonmetallic mineral products N Primary metal N Fabricated metal products N Machinery N Computer and electronic products N Electrical equipment, appliances and components N Transportation equipment N Furniture and related products N Miscellaneous manufacturing N Sector 42: Wholesale Trade Wholesale trade— Durable goods P Scrap waste material1 P Wholesale trade— Non-durable goods P Sectors 44—45: Retail Trade Motor vehicle and parts P Furniture and home furnishings P Electronics and appliances P Building materials, garden supplies P Lumber and building materials P Lawn and garden equipment and supplies stores P Food and beverage stores P Grocery stores P Convenience stores P Specialty stores P Fruit and vegetable P Beer, wine and liquor P Health and personal care P Gasoline stations P Truck stops P Clothing and accessory stores P Sporting goods, hobbies, books and music P General merchandise stores P Miscellaneous retail P Flea markets P Manufactured home dealers P Non-store retailers P Fuel dealers P Sectors 48—49: Transportation and Warehousing Air transportation P Rail transportation P Water transportation P Truck transportation1 P Transit and ground passenger P Pipeline transportation P Scenic and sightseeing transportation P Support activities for transportation P U.S. Postal Service P Warehousing and storage P Sector 51: Information Publishing industries P Motion pictures and sound industries P Motion picture theaters P Broadcasting and telecommunications P Communication towers and antennas1 P Information services and data processing P Libraries P Sector 52: Finance and Insurance Banks P Credit intermediation P Pawnshops P Security and commodity contracts/investments P Insurance carriers and related activities P Funds, trust, and other financial vehicles P Sector 53: Real Estate and Rental and Leasing Real estate P Mini-warehouses P Rental and leasing services P Videotape rental P Sector 54: Professional, Scientific, and Technical Services Professional, scientific, technical services P Display advertising— Signs1 P Veterinary services P Sector 55: Management of Companies and Enterprises Management of companies and enterprises P Sector 56: Administrative and Support and Waste Management and Remediation Services Administrative and support services P Landscape services P Waste management services P Waste collection P Solid waste collection P Hazardous waste treatment and disposal P Solid waste landfill P Solid waste incinerators P Material recovery facilities P All other waste management P Sector 61: Educational Services Educational services P Elementary schools P Secondary schools P Jr. colleges, colleges, universities, professional schools P Business schools, computer, and management training P Other schools and instruction P Tutoring and in-home instructions P Educational support services P Sector 62: Health Care and Social Assistance Ambulatory health care services P Hospitals P Nursing and residential care facilities P Nursing care facilities P Community care for elderly P Social assistance P Individual and family services P Community, food, and housing and emergency and relief services P Vocational rehabilitation services P Day care services P Sector 71: Arts, Entertainment, and Recreation Performing arts, spectator sports and related industries P Museums, historical sites, and similar institutions P Museums P Historical sites P Zoos and botanical gardens P Amusement, gambling, and recreation P Coin operated amusement, cash payouts, more than 5 machines P Coin operated amusement, non-cash payouts P Golf courses and country clubs P Marinas P Physical fitness facilities P Bowling centers P Weapons firing ranges, gun clubs1 P All other amusement and recreational industries P Sector 72: Accommodation and Food Services Accommodations P Hotels and motels P Bed and breakfast inns1 P Camps and recreational vehicle parks P Rooming houses, boardinghouses, dormitories, group occupied housing P Eating places P Drinking places P Sector 81: Other Services (except Public Administration) Auto repair and maintenance P General auto repair P Other repair P Personal and laundry services P Personal care services P Funeral homes and services P Cemeteries P Crematories P Laundry and dry cleaning services P Coin-operated laundries/dry cleaning P Pet care P Automotive parking lots and garages P Sexually oriented business1 P All other personal services P Religious, fraternal, professional, political, civic, business organizations P Religious organizations P All other organizations P Sector 92: Public Administration Executive, legislative, and general government P Justice, public order and safety P Courts P Police protection P Correctional institutions P Fire protection P Administration of human resources P Administration of environmental quality and housing program P Administration of housing, planning, CD programs P Administration of economic programs P Residential Uses Single-family detached P Duplex P Multifamily, apartments1 P Townhouses P Patio homes P Triplex and quadruplex P Manufactured homes Residential designed1 P Standard designed1 P Manufactured home parks1 P Accessory Uses to Residential Uses Bathhouses and cabanas P Domestic animal shelters P Noncommercial greenhouses P Private garage and carport P Storage building P Swimming pool, tennis courts P Auxiliary shed, workshop P Home occupation P Horticulture, gardening P Family day care home P Satellite dishes, and the like P Noncommercial production of livestock and animals P Buildings, structures P Open storage P All temporary uses P Staff Recommendation Table Notes and References: NA = Not Applicable. A. Measurement from property line. B. Measurement from average elevation to the finished grade at the building line to the highest point on the roof. C. Measurement in units per gross acre. D. No limits; however, buildings in excess of 40 feet in height shall observe an additional setback from side and rear property lines of one foot for each one foot in height over 40 feet. E. Twelve thousand square feet for single-family dwelling; 4,000 square feet for each additional unit. F. Minimum side and rear yard setbacks are as follows: Table 2: Schedule of Lot Area, Setback, Height, and Density, by District AD Minimum lot (square feet) Residential (G) 87,120 Nonresidential (commercial) 87,120 Without community sewer 87,120 With community sewer 87,120 Width (feet) 100 Minimum Yard and Building Setback (feet.) Front (A) residential Major street (multilane) 50 Major street (two lane) 50 Minor street 25 Front (A) nonresidential (commercial) Major street (multilane) 100 Major street (two lane) 100 Minor street 100 Side Residential 15 Nonresidential (commercial) 50 Rear Residential 20 Nonresidential (commercial) 50 Maximum commercial building size 20,000 Maximum height (feet) (B) D Maximum height (feet) (C) 1 Planning Commission Table Notes and References: NA = Not Applicable. A. Measurement from property line. B. Measurement from average elevation to the finished grade at the building line to the highest point on the roof. C. Measurement in units per gross acre. D. No limits; however, buildings in excess of 40 feet in height shall observe an additional setback from side and rear property lines of one foot for each one foot in height over 40 feet. E. Twelve thousand square feet for single-family dwelling; 4,000 square feet for each additional unit. F. Minimum side and rear yard setbacks are as follows: Table 2: Schedule of Lot Area, Setback, Height, and Density, by District AD Minimum lot (square feet) Residential (G) Nonresidential (commercial) Without community sewer With community sewer Width (feet) Minimum Yard and Building Setback (feet.) Front (A) residential Major street (multilane) Major street (two lane) Minor street Front (A) nonresidential (commercial) Major street (multilane) Major street (two lane) Minor street Side Residential Nonresidential (commercial) Rear Residential Nonresidential (commercial) Maximum commercial building size Maximum height (feet) (B) Maximum height (feet) (C) County Council Table Notes and References: NA = Not Applicable. A. Measurement from property line. B. Measurement from average elevation to the finished grade at the building line to the highest point on the roof. C. Measurement in units per gross acre. D. No limits; however, buildings in excess of 40 feet in height shall observe an additional setback from side and rear property lines of one foot for each one foot in height over 40 feet. E. Twelve thousand square feet for single-family dwelling; 4,000 square feet for each additional unit. F. Minimum side and rear yard setbacks are as follows: Table 2: Schedule of Lot Area, Setback, Height, and Density, by District AD Minimum lot (square feet) Residential (G) Nonresidential (commercial) Without community sewer With community sewer Width (feet) Minimum Yard and Building Setback (feet.) Front (A) residential Major street (multilane) Major street (two lane) Minor street Front (A) nonresidential (commercial) Major street (multilane) Major street (two lane) Minor street Side Residential Nonresidential (commercial) Rear Residential Nonresidential (commercial) Maximum commercial building size Maximum height (feet) (B) Maximum height (feet) (C) ParcelID STR Acres ParcelClass HouseNum PropertyAddress 124-00-00-022-000 79.7 AG-FARM 0 124-00-00-057-000 37.31 AG-FARM 0 125-00-00-050-000 23.5 AG-FARM 543 543 STEPHENS MILL 124-00-00-028-000 20.56 AG-FARM 21 21 WELLER 124-00-00-018-000 65.58 AG-FARM 0 124-00-00-027-000 296.27 AG-FARM 99 99 WELLER 124-00-00-030-000 108.82 AG-FARM 405 405 SWEETWATER 125-00-00-013-000 57.13 REGULAR 6% 232 232 STEPHENS 125-00-00-057-000 67.96 AG-FARM 0 125-00-00-066-000 37.48 AG-FARM 1251 1251 STEPHENS 125-00-00-062-000 28.47 AG-FARM 0 125-00-00-011-000 70.75 AG-FARM 0 124-00-00-058-000 20 AG-FARM 19 19 WELLER 125-00-00-010-000 76.43 AG-FARM 0 125-00-00-063-000 2.53 OO 1345 1345 STEPHENS 124-00-00-023-000 73.5 AG-FARM 0 124-00-00-029-000 153.74 AG-FARM 0 124-00-00-062-000 10 AG-FARM 17 17 WELLER 125-00-00-067-000 20 REGULAR 6% 0 City Owner Name OwnerAddress2 TURNER WILLIAM C & DEBORAH 114 INDIAN RIDGE DR NORTH AUGUSTA SC HATTAWAY TIMOTHY M 17 WELLER LN NORTH AUGUSTA SC ANDERSON JOHNNY F SR & LINDA 541 STEPHENS MILL DR NORTH AUGUSTA SC MCKENZIE THOMAS L & LISA K 21 WELLER LN NORTH AUGUSTA SC MILLER JIM & CYNTHIA 1514 EDGEFIELD RD NORTH AUGUSTA SC MILLER JAMES E 9 GEORGIA RD EDGEFIELD SC WILLIAMS JOHN L DR 385 SWEETWATER RD NORTH AUGUSTA SC MILLER JAMES E 1514 EDGEFIELD RD NORTH AUGUSTA SC MILLER JAMES E 1514 EDGEFIELD RD NORTH AUGUSTA SC SACK MAGAN NYCOLE 1002 REDWOOD DR NORTH AUGUSTA SC MCCARTHY GENE & NORMA &KEVIN D 375 SWEETWATER RD NORTH AUGUSTA SC WILSON BOBBY P & JAN O PO BOX 105 BALLENTINE SC BURKETT TRAVIS & CARRIE 19 WELLER LN NORTH AUGUSTA SC WILLIAMS JOHN L DR 385 SWEETWATER RD NORTH AUGUSTA SC MCCARTHY KEVIN D 1345 STEPHENS RD NORTH AUGUSTA SC WILLIAMS JOHN L DR 385 SWEETWATER RD NORTH AUGUSTA SC CAMPBELL SR TIMOTHY & SUSAN J 284 E SHORELINE DR NORTH AUGUSTA SC HATTAWAY TIMOTHY M & MARIE W 17 WELLER LN NORTH AUGUSTA SC MILLER JAMES E 1514 EDGEFIELD RD NORTH AUGUSTA SC OwnerAddress3 AssessedValue 29860 327,806.00$ 29860 193,930.00$ 29860 133,386.00$ 29860 599,038.00$ 29860 285,666.00$ 29824 803,694.00$ 29860 417,882.00$ 29860 254,457.00$ 29860 243,105.00$ 29860 186,763.00$ 29860 153,653.00$ 29002 301,961.00$ 29860 370,067.00$ 29860 196,536.00$ 29860 158,531.00$ 29860 307,745.00$ 29841 509,033.00$ 29860 358,281.00$ 29860 120,760.00$ Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 1 of 24 Sec. 24-29. Establishment and purpose of zoning districts. (a) For purposes of this chapter, the following zoning and special development districts are hereby established for portions of the county: (1) Zoning districts. a. Residential-Agricultural Development (RD). b. Rural-Residential Development (RR). c. General Residential Development (GR) d. General Commercial Development (GC) e. Industrial Development (ID). f. Limited Commercial District (LC). (2) Special development districts. a. Flood Hazard (FH). b. Airport Compatibility (AC). c. Planned Development (PD). d. Highway Overlay District (HOD). (b) Collectively, these districts are intended to advance the purposes of this chapter, as stated in the preamble. Individually, each district is designed and intended to accomplish the following more specific objectives. (c) Zoning districts; objectives: (1) RD Residential-Agricultural Development District. a. The purpose of this district is to foster, sustain, and prot ect areas in which the principal use of land is for single-family dwellings exclusive of residentially designed and standard designed manufactured housing, and related support uses. b. This district is also designed to allow greater use flexibility for la rge tracts, ten acres or more in size, as provided for in section 24-208, ten-acre rule. (2) RR Rural-Residential Development District. This district seeks to preserve the rural nature of development within its boundaries, managing density and fostering growth that is relatively quiet, low- traffic, and otherwise use-compatible with existing development. Through regulations aimed at achieving these ends, the district is intended to maintain the quality of life that citizens, farmers, and business owners of the district have historically enjoyed. (3) GR General Residential Development District. This district is projected to have the most public facilities and infrastructure in support of suburban/urban development such as schools, sewer, water, and streets. These are areas where development logically should be located as a consequence of planned public facilities. This district should include uses for single family, multi -family, residentially designed manufactured housing, and low impact commercial designed to provide services to residents. (4) GC General Commercial Development District. This district is to provide for a wide variety of retail and service uses to satisfy the common and frequent needs of residents in large sections of the county. This district supports most commercial uses including uses that require outdoor storage or dispensing systems. Proposed residential uses in this district are required to have larger lots and must meet the requirements of section 24-107, buffer yards. Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 2 of 24 (5) ID Industrial Development District. The intent of this district is to promote and accommodate industrial development in suitable environs, separated from potentially incompatible uses, including residential, social, and medical uses. This district also is intended to protect potential sites for industrial development. (6) LC Limited Commercial District. The LC District is intended to meet the commercial and service needs generated by residential areas. Goods and services commonly available in this district are of the "convenience variety", and relatively compatible with and suitable to locations in proximity to residential subdivisions. (d) Special development districts. (1) FH Flood Hazard Districts. a. It is the intent of this district to protect human life and health, minimize property damage, encourage appropriate construction practices, and minimize public and private losses due to flood conditions by requiring that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction. b. Additionally, this district is intended to help maintain a stable tax base by providing for the sound use and development of flood prone areas and to ensure that potential home buyers are notified that property is in a flood area. The provisions of this district are intended to minimize damage to public facilities and utilities such as water and gas mains, electric, telephone, and sewer lines, streets and bridges located in the floodplain, and prolonged busine ss interruptions; and to minimize expenditures of public money for costly flood control projects and rescue and relief efforts associated with flooding. (2) AC Airport Compatibility District. It is the intent of this district to protect the dual interests of airports and neighboring land uses, and to: a. Protect and promote the general health, safety, economy, and welfare of airport environs; b. Prevent the impairment and promote the utility and safety of airports; c. Promote land use compatibility between airports and surrounding development; d. Protect the character and stability of existing land uses; and e. Enhance environmental conditions in areas affected by airports and airport oper ations. (3) PD Planned Development District. The Planned Development District provides a mechanism for the planning commission, the county council and the applicant to agree on the scope of the proposed development. Some concepts will be more appropriate than others will and the approval of an application in one location does not necessarily indicate the development will be acceptable in other locations. a. Intent. 1. Encourage flexibility in the larger scale development of land in order to promote its m ost appropriate use; 2. Improve the design, character and quality of new development; 3. Facilitate the provision of streets and utilities; 4. Preserve the natural and scenic features of open areas; and 5. Shall follow the intent of the Comprehensive Plan. b. Generally. Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 3 of 24 1. An area may be eligible for Planned Development District zoning if either of the following conditions exist: (i) Separate land uses not otherwise permitted to [be] locate[d] within the same zoning district are proposed for development on one or more adjacent parcels. This would allow up to ten percent commercial in RR and RD Zones. (ii) Exceptions or variations to the existing regulations are essential for the project in terms of site, design or dimensional requirements. 2. Minimum parcel size: 15 acres. 3. Minimum parcel depth: 300 feet. 4. Minimum parcel width: 200 feet. 5. Lot shall adjoin or have direct access to at least one state or county approved paved road. Standards for interchanges and curb cuts on the paved road shall follow current county policy. 6. If the site consists of multiple ownerships, each owner shall file an application for amendment to the zoning plan. c. Uses. 1. Permitted uses. The planning commission and the county council may permit any use proposed by the developer as being compatible to other nearby uses within and beyond the district. A listing of permitted uses within a Planned Development District shall become a part of the regulations applying to that district. Thereafter, the uses permitted in the district shall be restricted to those listed, approved and adopted. 2. Prohibited uses: (i) Sexually oriented businesses. (ii) Mobile or manufactured housing. d. Design criteria and development standards. 1. Overall site design shall be harmonious in terms of landscaping, enclosure of principal and accessory uses, sizes of structures, street patterns and use relationships. Variety in building types, heights, facades, setbacks and size of open spaces shall be encouraged. 2. There shall be a maximum of one detached residential unit per 6,500 square feet of land area including yard and other dimensional requirements. 3. Buffer yards. As determined as needed by the planning commission and the county council. 4. Open space. There shall be a minimum of 30 percent open space which shall be set aside in perpetuity and cannot be built upon with residential structures. 5. All standards of the existing zoning district shall apply, if not specified otherwise in that particular Planned Development District. 6. Impervious area. There shall be a maximum of 30 percent impervious area in the PD. e. Administrative procedures with regard to Planned Development Zoning Districts. 1. Required zoning chapter amendment. The establishment of a Planned Development Zoning District shall be an amendment to this chapter and be administered in accordance with section 24-241. The applicant shall submit the request to the planning commission for Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 4 of 24 review, public hearing and recommendation to the county council for further public hearing and final action. 2. Time limitation. If the approved Planned Development District has not begun within two years of its approval date by the county council, the Planned Development District shall become invalid and the land classification shall revert to its previous zoning classification. The county council must receive an extension request at least six months before the end of the approval period. The county council may grant only one extension per project . f. Submission materials required for development plan. 1. Purpose and effect. An application for rezoning to a Planned Development District shall include a development plan incorporating the information required in subsection f.2. of this section, and such additional information, as the planning commission may deem necessary to provide a detailed understanding of the proposed PD. Although it is unnecessary to submit engineering drawings at this stage, the development plan must sufficiently demonstrate its superiority to other forms of development or other zoning districts. 2. Application contents. The following information and documentation together with such additional information as required by the planning commission shall constitute a rezoning application: (i) The applicant's name, address and ownership interest in the subject property. (ii) The name, address and signed written consent of those having an ownership interest, if different from the applicant filing the application. (iii) The tax map identification number. (iv) The existing and proposed zoning classifications and current uses of the subject and adjacent properties. (v) A survey showing property boundary lines, metes and bounds, utility transmission lines and public rights-of-way crossing and adjacent to the subject property. (vi) A vicinity map showing a five-mile radius. (vii) A written statement describing the proposed development's compliance with the comprehensive plan. (viii) One or more development plans at a scale approved by the zoning administrator planning department depicting or describing the following features of the development: A. A land use plan map with a description of the type, location and nature of land use (and building type and proposed architectural style) within each area of the development indicating the acreage and the proposed density and lot requirements of each subarea. B. A proposed traffic circulation map, which illustrates internal traffic ways, related to the development, existing and proposed access points, and through roads accessing adjacent parcels. C. A general description of the means of providing utilities, refuse collection, schools, fire protection, libraries, parks and similar services, where applicable. Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 5 of 24 D. A delineation and description of the open space areas and a generalized landscaping plan. E. A statement identifying easements and restrictive covenants relating to the establishment of common open space or service facility within the planned development and the establishment and activation of any entity that is to be responsible for the management and maintenance of any public or private common area. The county is not responsible for enforcing easements and restrictive covenants. F. A project analysis done by a reputable, independent firm to include the following information at a minimum: • Current and potential traffic counts. • Population and income within the development's market area. • An analysis of existing comparable developments and their impact on the surrounding neighborhoods. • A review of alternative locations considered and why this one is the best option. • A sales gap analysis for the market area showing the current sales figures for the products to be sold in the area vs. the potential market for these products. • Any other relevant information as deemed necessary by the planning commission or the county council. • An analysis of traffic impact on the surrounding area including approval of the proposed traffic plan by the state department of transportation. • An analysis estimating the impact to the county-provided emergency services with comparisons showing current conditions and conditions at the time of stabilization. Include estimated project schedule from ground breaking to stabilization or sellout of units. • A traffic study by a licensed engineer shall be completed for the PD. The study will analyze the traffic volumes at the entrance intersection(s) of the PD roads and all intersecting roads. The engineer will determine what if any improvements are required on the adjoining roads. The study will measure the current level of the level of service (LOS) of the adjoining roadways before and after the development. G. A tabulation of the following information: • The maximum number of dwelling units proposed by type of structure including typical size or size restrictions. • The maximum total square feet of building floor area proposed for nonresidential uses by type of use, or by subarea, if applicable. • The total land area, expressed in acres and as a percent of the total development area, proposed to be devoted to residential and nonresidential uses. • The minimum lot requirements for each proposed use if different from the minimum lot requirements specified in the current zoning district. Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 6 of 24 H. If the planned development is proposed for construction in phases, a proposed phasing plan shall be submitted stating the portion of each uses and public spaces to be provided during each stage. I. A statement identifying each of the regulations or other applicable provisions of this chapter, which the applicant proposes to be modified as part of the development plan, the proposed modification and the justification thereof. g. Fees. 1. Fees due at the time of formal application to the planning commission are $100.00 per acre, with a maximum application fee of $1,000.00. Paying the application fee does not guarantee approval of any feature of the application. 2. The developer must furnish a bond to cover the cost of infrastructure for each proposed phase. The bond must be from an insurer rated "A" or better by A.M. Best. (4) HOD Highway Overlay District. a. Purpose. The intent of this district is to protect residents, enhance developments and improve the traffic flow on primary highway corridors in Edgefield County. The county council may establish additional Highway Overlay Districts by ordinance on other highways in various areas of Edgefield County. b. Delineation of Highway Overlay Districts. This applies to property parcels fronting on or within 400 feet of the right-of-way of the roads listed below, except for property zoned residential: 1. Murrah Road Extension. 2. Five Notch Road from the Aiken County Line to the intersection of Murrah Road Extension Sweetwater Road. 3. Sweetwater Road from the intersection of Five Notch Road Big Oak Dr. to the Aiken County Line. 4. Highway 25 South from the Aiken County Line to the intersection of Greenhouse Road and Highway 25. 5. W. Martintown Rd from Aiken County Line to the intersection of Old Martintown Rd. 6. The intersection of Briggs Rd, Martintown Rd, W Martintown Rd, and Woodlawn Rd. c. Applicability. This applies to all new construction other than single family residential. The overlay district also applies to an entire site or development other than single family residential if the building official determines that any renovation or expansion of the site or development exceeds 50 percent of its appraised value as set by the Edgefield County Assessor, or by the building official for developments that are tax exempt. For a development composed of individual lots, the determination of whether the previously mentioned limit has been exceeded shall be based on the appraised value of the individual lot or lots on which the proposed improvement or improvements will be located and not on the appraised value of the entire development, including other lots. d. Open space. A minimum of 25 percent of the site must be devoted to open space not covered by building or pavement for a nonresidential use and 40 percent for multifamily residential use. e. Signs. This only applies to signs visible from any point on a street right -of-way in the overlay district. Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 7 of 24 1. Design standards. (i) All signs shall conform to the provisions for signs and outdoor displays of the International Building Code and of this section. (ii) No sign or sign structure shall be erected, constructed, or maintained so as to obstruct any fire escape, window, door, opening, or any means of ingress and/or egress. (iii) Illuminated signs shall be so placed and so shielded that glare from the sign does not adversely affect any residential area or use nor interfere with the operation of a vehicle on any public right-of-way. 2. Sign measurement. (i) The square footage of the sign area shall be the area enclosed within a perimeter consisting of a series of straight lines at right angles enclosing all parts of the sign face. The area of a freestanding sign includes the area of the sign face on one side only. The certification of measurements by a licensed professional engineer, the sign manufacturer, or other professional may be accepted for irregularly shaped or uniquely shaped [signs]. (ii) Signs are subject to review and approval by the zoning administrator planning department. (iii) The height of a sign shall be measured from the edge of the pavement of the street abutting or closest to the sign structure to the top of the sign or sign structure, whichever is higher. (iv) Federal-mandated or state-mandated requirements for signage based on federal or state law or regulations are exempt from the sign area limitations, but only to the extent of such minimum requirements. 3. Prohibited signs and exceptions in overlay district. The following signs are prohibited in "overlay districts". (i) No off-site signs identifying or advertising a business or use shall be permitted other than on the premises of such building or use. (ii) No sign shall display intermittent lights resembling the flashing lights customarily used in traffic signals or in police, fire, ambulance, or rescue vehicles, nor shall any sign use the words "stop", "danger", or any other word, phrase, symbol or character in a manner that might mislead or confuse any vehicle driver, except for temporary construction signs and lights indicating a hazard. (iii) Signs painted on or attached to trees, fence posts, and telephone or other utility poles; signs painted on or attached to rocks or other natural features; or signs panted on the roofs of buildings. (iv) Signs which contain a high intensity illuminating device causing it to blink , flash, pulsate, fluctuate, or animate, except signs giving public service information such as time, temperature, date, weather, or similar information intermittently with low intensity lights. (v) Changeable face signs and changeable-copy signs on which the message changes more than one time per minute. Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 8 of 24 (vi) Mobile or portable signs that are not attached to a permanent foundation. (vii) Ribbons, streamers, and similar materials or devices whether moving or not are prohibited. (viii) Signs within street or highway right-of-way are not allowed except: A. One newspaper box per family. B. Standard highway signs and markers that the SCDOT and Edgefield County may authorize. C. Historical, commemorative and other monuments and memorials approved by staff. D. Signs for public events located in the right-of-way. E. Signs for the entrance or identification of subdivisions or Planned Development (PD) which are approved by the planning commission, so long as such signs are not located on right-of-way property owned by a government. (ix) Abandoned signs. (x) Signs placed with the primary purpose of providing a sign not otherwise allowed by this section. 4. Wall or projecting signs. (i) Wall signs on a building (including signs attached flat against the wall, painted wall signs, and projecting signs) shall meet the following requirements: A. Signs on the front surface of a building shall not exceed 20 percent of that surface. B. Signs on the side and rear surface of a building shall not exceed 25 percent of that surface. C. Depth of wall signs. Wall signs attached flat against a wall may extend not more than 18 inches from the wall. A wall sign which extends more than two inches from the wall shall be placed a minimum of eight feet above any sidewalk. (ii) Projecting signs perpendicular to the wall of a building may be substituted for a wall sign. Projecting signs shall be placed a minimum of eight feet above any sidewalk and may project a maximum of six feet. Total area of projecting signs shall not exceed ten percent of front surface area of building. 5. Freestanding signs. (i) In general. A. Any freestanding sign must be a monument sign complying with item (iii), monument signs, below. B. A freestanding sign is a sign not attached to a building and containing a sign face on one or more sides. C. Freestanding signs shall not project into any street or highway right-of- way. Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 9 of 24 D. All freestanding signs must be monument signs with a maximum height from four feet to 12 feet. All such signs shall have a consistent style or unifying theme. (ii) There shall be no more than one freestanding sign permitted per lot, except where the lot fronts on two arterials as determined by the zoning administer, in which case an additional freestanding sign may be permitted with no more than one such sign located along each arterial. (iii) Monument signs that are freestanding shall not be included in calculating the area of the sign permitted by this section. The area of the supporting structure shall not exceed 50 percent of the total combined area of the sign and supporting structure. Any pedestal on which a sign rests shall be at least 67 percent of the width of the entire sign. (iv) Reader boards are not permitted. (v) Shopping center signs. A. Signs identifying the name of the shopping center as well as the individual stores shall be consolidated on one monument sign standard. B. Not more than one such sign standard shall be permitted per shopping center except where a shopping center fronts on two arterials as [determined] by the zoning administrator planning department. If a shopping center fronts on two major arterials with more than 150 feet of frontage on each, one additional sign standard shall be permitted with no more than one such standard being placed on each such arterial. C. Any shopping center with two or more businesses may have one freestanding sign not to exceed 60 square feet for the first two tenants and an additional ten square feet for each additional tenant over two, with a maximum of 120 square feet. 6. Miscellaneous sign types. (i) For institutional signs for such uses as schools and churches, one double -face sign or two single-face signs shall be permitted for each entrance to the project or use. If a double sign is proposed, the total area of the faces of both signs shall not exceed the maximum permitted sign area for a single sign. All such signs shall be ground-mounted, monument-type signs. No additional freestanding sign shall be permitted. Where approved by the zoning administrator planning department, such signs may be located in a landscaped median in the right-of way. (ii) B anners for governmental or civic organizations are allowed at the entity's main location or at the location of the activity promoted on the banner. No banners shall be erected in a street right-of-way except as approved by the zoning administrator planning department. (iii) A maximum of three flags may be displayed on each lot of record zoned any category other than single-family residential use. (iv) Canopy or awning signs in place of wall or projecting signs are allowed in accordance with the following provisions: Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 10 of 24 A. Canopies or awnings extending over the sidewalk or walkway may display one business identification sign at each building entrance with a combined area not to exceed 20 percent of the surface of the awning or canopy. B. Canopy or awning signs shall not project beyond the curb line of the adjacent street or alley. C. One business identification sign not exceeding one and one-half square feet is permitted to hang underneath the awning or canopy, in addition to the sign displayed on the canopy. 7. Temporary signs. (i) Signs on new projects under construction. One non-illuminated sign, not exceeding 32 square feet in nonresidential areas and 16 square feet in residential areas, displaying the [name] of the building, the contractors, the architects, the engineers, the owners, and the financial, selling and development agencies, is permitted upon the premises of any project under construction, alteration or relocation. Such sign shall be removed from the site if the project is abandoned for six months or within 30 days after substantial completion of the project as determined by the zoning administrator planning department. (ii) Construction, remodeling and other signs. Signs not exceeding five square feet in size identifying the contractor involved in remodeling, re-roofing, landscaping or other similar service are permitted provided they are removed within ten days after substantial completion of the project, as determined by the zoning administrator planning department. (iii) Real estate signs are permitted for advertising a property for sale or lease provided it conforms to all of the following standards: A. Size shall not exceed five square feet in any residential district or for a single-family residential unit in a PD and 32 square feet in any other district, including all peripheral attachments. B. Copy shall be limited to: (1) the name of the owner or the listing agent, (2) the real estate company, (3) the type of offering, and (4) telephone numbers. C. The quantity shall be limited to one per street frontage of the affected premises. D. A freestanding sign shall be mounted so that its top edge is no higher than four feet above grade, and the top of a façade-mounted sign shall be mounted no higher than eight feet above grade and it doesn't block the sight distance. E. The sign shall not be illuminated. The sign may be illuminated with a sign topper not disruptive to traffic. F. A second sign announcing an open house that is no larger than the primary sign or a smaller sign attached to the primary sign may be erected for a period not to exceed 48 hours on the subject property. Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 11 of 24 G. Signs offering tenant space shall not be freestanding, but may be placed as a tenant panel on a permitted directory sign or in the window of the tenant space being offered. (iv) A banner is permitted for the grand opening of a retail establishment for a period not to exceed 21 days. One banner not to exceed 75 [square] feet in size may be allowed on the façade of the building. This regulation shall not be construed to regulate the use of small balloons. (v) The maximum size of a sign for a multifamily project or a project with attached single-family units shall be 32 square feet in area and six feet in height on any arterial and 20 square feet in area and four feet in height on any street other than an arterial. Any such sign may be illuminated only by exterior lighting. (vi) Any individual nonresidential use on an individual lot may have one freestanding sign not to exceed 50 square feet in area and 12 feet in height on any major thoroughfare and one sign not to exceed 30 square feet and four feet in height on any street that is not a major thoroughfare. f. Parking spaces to be provided. 1. Spaces required for off-street parking for all structures and uses of land shall conform to the requirements shown in section 24-31, schedule of permitted and conditional uses, and off-street parking requirements by zoning districts. The zoning administrator planning department may accept a different number of spaces in accordance with subsection 4.(i) below. 2. Calculation of off-street parking requirements: (i) When calculating the minimum number of off-street parking spaces in accordance with the section above, calculations shall be rounded to the nearest whole number. (ii) Calculation of required off-street parking for any eating establishment shall include all seating areas located outdoors. 3. Parking for uses not in section 24-31 shall be governed by the provisions in those paragraphs most suitable for that use as determined by the zoning administrator planning department. 4. Developer submitted parking data. (i) The planning commission at their discretion may accept a higher or lower number of parking spaces than required in section 24-31, or a specific number of spaces for a use not listed based on developer submitted parking data such as a shared parking analysis or appropriate standards from another accepted source. (ii) If the planning commission accepts a lower number of parking spaces than is required in section 24-31, the site shall be required to accommodate the higher number of spaces in case of future need. The design and location of these additional parking spaces shall meet the site design standards in f.1. above and the following: A. The area necessary to accommodate these spaces shall not be included as part of the site's minimum open space requirement. Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 12 of 24 B. The area necessary to accommodate these spaces shall be included in the impervious coverage for the site and accounted for in the drainage design. C. Until or unless such spaces are needed, as determined by the zoning administrator planning department, the area shall be maintained as open space. 5. Off street parking design standards. (i) General design standards for new or changed parking areas shall be developed in accordance with the following design standards. A. Any parking facilities containing ten or more parking spaces shall be paved with concrete or asphalt. If parking facilities containing fewer than ten parking spaces are not paved with concrete or asphalt, the parking spaces reserved for handicapped parking and the pathway leading from the handicapped parking spaces to the entrance to the building shall be paved with concrete or asphalt. B. No more than one bay of parking shall be allowed between a structure and the right-of-way of the primary street fronting the site. C. Driveways and parking areas shall be designed to limit the removal of significant and grand trees to the maximum extent feasible. D. Landscaped buffers for parking areas adjacent to any property zoned or used residentially shall be provided for in accordance with the open space and landscaping section. No parking shall be permitted in required side yards adjacent to any residential district or use. Any light used to illuminate said parking area shall be directed away from any property zoned or used residentially. E. All off-street parking facilities shall be designed with appropriate means of access to street, alley or maneuvering area. F. Each required parking space shall be at least nine feet by 19 feet. (ii) Off-street parking for a development in front of an arterial street shall be designed so that vehicles can turn around within the parking facility without backing into the street. (iii) Parallel parking stalls shall be not less than nine feet by 24 feet. The minimum isle widths for 90 degree parking shall be 24 feet, for 60 degree parking, 20 feet, 45 degree parking, 15 feet. Only one-way traffic shall be permitted in driving aisles serving single-row parking spaces placed at an angle other than 90 degrees. (iv) Wheel-stops are required in all parking facilities without perimeter curbing. The vehicle side of the wheel-stop shall be no less than 18 inches from the end of the parking space. Where sidewalks or other walkways occur in parking facilities, parked vehicles shall not overhang or extend over the sidewalk. Where sidewalks are six feet or more in width, wheel-stops shall not be required. Wheel-stops are not required for interior parking spaces. g. Driveway standards. Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 13 of 24 1. Driveways shall comply with South Carolina Department of Transportation standards for separation. No more than one driveway shall be allowed for every 300 feet of street frontage. 2. No driveway or curb cut into a public parking area shall exceed 30 feet in width for two - lane driveways and 15 feet in width for single-lane driveways. For the purposes of this paragraph, the width of any landscaped median shall not be included in determining driveway width. 3. No driveway serving a nonresidential use shall be permitted through a residential area, and no driveway serving a multifamily use shall be permitted through a single -family area. 4. Detailed plans shall be submitted to the zoning administrator planning department for approval of all driveway openings or curb cuts before a permit may be obtained. 5. Interconnecting driveways. Where a parking area is within 50 feet of a property line which is not on a street right-of-way, an easement shall be provided to allow for a future driveway connection to the adjacent property. A cross-access easement and hold-harmless agreement shall be required for interconnecting drives. h. Off-street loading space. 1. Whenever the normal operation of any development requires that goods, merchandise, or equipment be routinely delivered to or shipped from that development, a sufficient off - street loading and unloading area must be provided in accordance with this section to accommodate the delivery or shipment operations in a safe and convenient manner. Determination of the applicability of this section shall be made by the zoning administrator planning department. 2. Typical loading area requirements are shown below and indicates the number and size of spaces that normally shall satisfy the standard set forth in this subsection. However, the zoning administrator planning department may require more or fewer spaces if necessary to satisfy the intent of this standard, upon evaluation of adequate data submitted by the applicant. Gross Floor Area in Structure Number of Loading Spaces 0 to 25,000 s.f. 1 25,001 to 40,000 s.f. 2 40,001 to 100,000 s.f. 3 100,001 to 160,000 s.f. 4 Over 160,000 s.f. 4 plus 1 space/+ 80,000 s.f. 3. Design standards. (i) Minimum dimensions for space shall be 12 by 40 feet. The zoning administer planning department if deemed necessary for a given expected type of vehicle use may require additional length or width. An overhead clearance of 14 feet from pavement grade shall be required. (ii) Loading areas shall be so located and designed that the vehicles intended to use them can maneuver safely and conveniently to and from a street right -of- way and complete loading and unloading operations without obstructing or interfering with any public right-of-way, parking space, or parking lot aisle. No backing into the street shall be permitted. Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 14 of 24 (iii) No area allocated to loading and unloading facilities may be used to satisfy the area requirements for off-street parking, nor shall any portion of any off-street parking area be used to satisfy the area requirements for loading a nd unloading facilities. Detached single-family dwellings are not subject to this requirement. 4. Exceptions apply whenever there exists a lot that meets all of the requirements below. If so, the developer need only comply with this section to the extent reasonably possible. (i) One or more structures on the lot were constructed before the effective date of this chapter; and (ii) A change in use is proposed that does not involve any enlargement of a structure; and (iii) The loading area requirements of this section cannot be satisfied because there is insufficient area available on the lot that can practically be used for loading and unloading. i. Large retail projects. 1. A large retail project is defined as any new, predominantly retail development or collection of retail uses with a gross indoor floor in excess of 40,000 square feet or any enlargement or alteration to an existing predominantly retail project that would result in a gross indoor floor area in excess of 40,000 square feet. 2. Any new large retail project or one for which the cost of alterations, renovation, expansion in any one-year period exceeds 50 percent of the appraised value of the development as set by the Edgefield County Tax Assessor shall comply with the following. (i) These projects can be located in Planned Development (PD) or General - Agricultural District (GD) within the overlay district. Site/landscape plan approval shall be required prior to issuance of a building permit. (ii) The buildings will be designed in a way that will reduce massive scale, provide visual interest, and avoid overwhelming surrounding development. The buildings shall be configured in a manner harmonious with topography an d vegetation. (iii) Architectural controls. A. Predominant exterior building materials may include brick, wood, stone, tile, split concrete block, or stucco. Smooth-faced concrete block are not permitted. B. Exterior façade colors must be low-reflecting, low-intensity, subtle, and neutral or earth-toned. Building trim may feature brighter, complementary colors that do not overwhelm the primary colors. Neon tubing is not allowed as accent material. C. Rooflines shall be varied to add interest, minimize massive scale, and complement the character of nearby neighborhoods by using parapets, gables, eaves, or other similar designs. D. No large expanse of exterior walls will be allowed. Variation may be achieved by using recesses, projections, windows, columns, horizontal and vertical offsets, awnings, canopies, and other features. Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 15 of 24 E. Screening of rooftop or other mechanical or electrical equipment shall be screened to minimize noise and view from all directions except overhead. If the equipment is roof-mounted, the screening shall be designed to conform architecturally to the design of the building. Walls or evergreen shrubbery must screen ground mounted mechanical or electrical equipment; shrubbery must be large enough at the time of planting to screen the equipment. F. The building design shall clearly indicate to visitors where entrances are located. Walkways shall be well lighted and marked, easily accessible to parking areas, and in the safest areas. G. Outdoor sales areas shall be incorporated into the overall design of the building and shall be screened with walls and/or fences not to exceed 15 feet in height. Materials, colors, and design of such walls and fences shall conform to those used predominantly on the principal building. To prevent unsightly clutter outdoor storage of products in an area where customers are not permitted is prohibited. H. Outdoor lighting shall comply with subsection j. below. I. Fences shall not exceed eight feet in height except those for outdoor sales and storage areas. Chain link fencing is not permitted. (iv) Landscaping. A. A landscape plan for a large retail project shall be incorporated as part of site plan approval. Prior to issuance of a building permit or a development permit (site permit), a detailed landscape plan conforming to the tree preservation and landscaping provisions in subsections j. and k. below and conforming to the provision of article IV, Appearance, buffering, screening, and landscaping. Screenings must be approved except where such provisions would conflict with the following provisions. B. Buffers along a street right-of way, (including out-parcels), shall be a landscaped buffer yard at least 30 feet in depth. C. In the buffer yard, in addition to the required trees there shall be a continuous screen consisting of either evergreen shrubbery and/or a berm with plantings. (1) The shrubbery shall be at least three feet high after pruning at the time of the planting and shall be planted no more than five feet on center in at least two staggered rows. (2) Any berm must be at least three feet high. Any berm less than five feet high must be planted with evergreen shrubbery at least two feet high after pruning at the time of planting and shall be planted no more than five feet on center in at least two staggered rows. (3) The screen shall be maintained at a minimum of five feet in height after plantings have matured. D. The buffer yard may include a sidewalk or pathway parallel to the street and/or sidewalks or pathways perpendicular to the street to provide a pedestrian connection to parking areas. Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 16 of 24 E. Garbage and trash collection areas and delivery and loading areas shall be screened from view of adjacent property and street rights-of-way with a masonry wall or wooden fence and/or evergreen shrubbery and shall be located away from pedestrian and vehicular traffic, and shall be out of sight to the maximum feasible extent. (v) Delivery and loading. A. Delivery and loading areas shall be designed and located to minimize visual and noise impacts to residential areas. B. Each delivery and loading dock shall be set back at least 75 feet from adjacent land zoned or used residentially including a landscaped buffer at least 30 feet in depth along the property line conforming to the provisions in the buffer yard section. C. Delivery trucks shall not be parked during non-delivery hours with any motor, compressor, refrigerator or similar device running unless it is a t least 100 feet from property zoned or used residentially. (vi) In addition to the sign provisions in section (d)(4)e. above, all signs within a new or altered large retail project shall be compatible and use similar design elements. (vii) A "traffic impact study" by a licensed traffic engineer shall be submitted for the proposed project. The analysis and guidelines for needed improvements should include but not be limited to the South Carolina Highway Capacity Manual, 2003, and any subsequent addendums. The developer/owner shall be responsible for any new or additional roads or improvements, turn lanes, traffic signals, or other improvements made necessary by the project. j. Outdoor lighting. 1. All lighting shall be designed to minimize the amount of ambient light perceptible from adjacent properties or that would impair the vision of a motorist. 2. Fixture design: (i) Each fixture shall be a full cut off, down directional lighting fixture whose source is recessed with an opaque housing. (ii) Each fixture under a building canopy shall be flush mount with a flat lens. (iii) Maximum electricity levels per fixture on a pole shall be 420 watts, on a wall 250 watts, and under a canopy 400 watts. (iv) The cone of light from any fixture shall not be directed at a property line. (v) Only incandescent, fluorescent, metal halide, mercury vapor, or high-pressure sodium sources may be used generating either white or off-white light. 3. No pole height may exceed 42 feet including the base except t hat no pole within 100 feet of any property zoned or used residentially shall exceed 25 feet. 4. The maximum lighting levels in footcandles shall not exceed the following: Location of Type of Lighting Minimum Average Maximum Parking lots 0.6 2.4 10 Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 17 of 24 Outdoor display of merchandise 0.5 1.0 15 Landscape and decorative 0.0 0.5 5 Walkways and driveways 0.2 1.0 10 Canopies 20 25 30 5. The maximum light spillover shall not exceed two footcandles at the property line adjacent to a street right-of-way or property zoned to allow commercial use and one-half footcandle at the property adjacent to any property zoned or used residentially. 6. All wiring and connections must be underground. 7. A site lighting plan should be submitted in conjunction with the site plan at a minimum scale of 1" = 20' and include the following: (i) The location, design, type of lamp, distribution, manufacturer's photometric data (including lumens and wattage), and mounting information for each light fixture including those under the canopy. (ii) The location and height of each light standard. (iii) Light intensity levels in footcandles at points on a ten-foot grid and the minimum average and maximum footcandle calculations excluding the areas of any building. (iv) A notation that all requirements of the lighting provisions will be met. 8. The zoning administrator planning department after issuance of a certificate of occupancy has the discretion of requiring changes to fixtures to bring the lighting levels into compliance with these provisions or to alleviate particular impacts on residential areas or motorists. 9. Any existing large retail project shall come into compliance with these provisions if the cost of any renovation or expansion in any one-year period exceeds 50 percent of the appraised value of the development as set by the Edgefield County Tax Assessor or by the building official if the property is taxed exempt. 10. Lights from vehicles should not affect adjacent property that is zoned or used residentially; parking areas and driveways shall be screened from such property by evergreen shrubbery planted at least five feet on center and three feet high at the time of planting after pruning or by a berm at least three feet high. The zoning administrator planning department may waive this provision if it is not necessary because of topography or other reasons. 11. Lights intended to attract attention such as searchlights, flashing lights, or other such lights are prohibited. 12. Lighting used during construction must be full cut-off or directionally shielded fixtures that are aimed and controlled so the directed light is substantially confined to the object intended to be illuminated. A building is no longer considered under construction once exterior walls and windows are installed and permanent lighting replaces temporary lighting as the primary source of lighting for the building. 13. Holiday lighting displays and neon lighting used to outline a structure are e xempt from these standards though such lighting may not extend above the roofline. Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 18 of 24 14. Any variance request from the developer or their engineer for relief from any of the lighting requirements described above must be accompanied by a detailed explanation of the additional impact the granting of the variance would have on surrounding properties. k. Tree preservation. 1. Significant trees are oaks, pine, magnolia, or other trees that grow to have a diameter breast height (DBH) of eight to 24 inches, or a dogwood, redbud, or other smaller tree that does not grow as large with a DBH of four to six inches. A grand tree is an oak, pine, magnolia, or other trees over 24 inches DBH or a dogwood, rosebud, or other smaller tree over eight inches DBH. 2. Removal of existing trees. (i) The natural landscape, including existing trees, shall be preserved wherever possible. On all non-residential and multifamily developments within the overlay district, no significant or grand tree may be removed in the setback, bufferyard, or open space areas (tree protection areas) of a development site unless one or more of the following can be demonstrated to the satisfaction of the zoning administrator planning department, at their discretion. A. It is in the interest of good forestry management. B. The tree is diseased, dying, or dead. C. The tree causes a safety hazard to nearby buildings or pedestrians or vehicular traffic. D. The tree is a pine, pecan, or magnolia that is dropping debris or sap that is significantly affecting vehicles in a parking lot. E. The tree is causing significant structural damage to a building or other structure that reasonable maintenance cannot prevent. F. The tree is interfering with an existing underground utility line. G. It is necessary to allow construction of a road or driveway essential for access to the site, subject to the requirement that the inches of grand and significant trees removed therefore shall be replaced when the site is developed. (ii) If significant or grand trees are removed on land zoned to permit single family residential, no application for rezoning to a commercial or multi-family residential zoning classification will be considered for two years after staff determines that such removal has occurred. 3. Removal of trees associated with development must first obtain a site permit for a nonresidential or multifamily project, a site/landscape plan must be approved in accordance with the following provisions. (i) A detailed tree survey shall be submitted for every non-residential and multi- family project within the overlay district showing the tree protection areas or the entire development site depicting the DBH, variety, and location of all significant and grand trees at the same scale as the site plan; this information shall be prepared by a licensed engineer, surveyor, landscape architect, forester, arborist or other person with demonstrated experience in preparing accurate tree surveys as determined by the zoning administrator planning Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 19 of 24 department. The information submitted shall not be more than two years old on the date of the application submission. (ii) Tree protection areas (setback, buffer yard, and open space). A. All significant and grand trees shall remain unless their preservation would prevent the installation of a necessary driveway, sidewalk, permitted sign, or essential utility. All such driveways, sidewalks, signs, and utilities shall be located so as to preserve the maximum number of grand and significant trees as determined by the zoning administrator planning department. B. No grand tree shall be removed from the tree protection areas unless the zoning administrator planning department determines there is absolutely no alternative because of unavoidable grading or because of the required configuration of paving, essential utilities, or buildings. No more than 80 percent of the DBH inches of significant trees may be removed from the tree protection areas unless the zoning administrator planning department determines there is absolutely no alternative because of unavoidable grading or because of the required configuration of paving, essential utilities or buildings. C. G rand and significant DBH inches remove d from the tree protection areas shall be replaced somewhere within the tree protection areas, or elsewhere on the development site as approved by the zoning administrator planning department, except for trees removed: (1) pursuant to the requirements of county ordinances and regulations; (2) after determination by the county staff to be diseased, dying, or dead; or (3) in conjunction with construction of athletic fields at a public or private school required by the SC State Department of Education or other licensing or accreditation organizations for such schools. D. The cumulative DBH of replacement trees shall at least equal the cumulative caliper of the grand and significant trees removed except that the DBH of any grand or significant tree on the approved tree list saved or newly planted may count double as replacement trees under this provision. E. Trees planted to meet other requirements of this section may be counted as replacement trees. The minimum caliper for a replacement tree shall be two inches and the tree must be from the approved tree list. F. The zoning administrator planning department shall approve the type, size and location of each replacement tree. G. When the zoning administrator planning department determines that planting the required number of trees on the site will result in an unacceptable density of trees based upon good forestry management, the zoning administrator planning department may reduce that number; provided, however, in such event, that off-street parking shall be limited to no more than ten percent over the minimum number of spaces required. 4. Tree protection during and after construction. Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 20 of 24 (i) During construction and grading a circular protected area with a radius equal to one foot for every inch of DBH of each tree shall be provided within which paving, grading, or the storage of dirt, building materials, debris, or any other materials or other equipment shall not be allowed. Each protected area shall be enclosed by a barrier constructed in a manner required and approved by the zoning administrator planning department prior to commencement of clearing and grubbing and grading of the site and prior to issuance of the development permit or building permit. Failure to maintain barriers may result in revocation of the building permit and/or development permit. Protective barriers shall be maintained until issuance of a certificate of occupancy. The protected areas shall be permanent and maintained by the property owner. No pavement shall be installed in the protected areas. (ii) Tree maintenance provisions shall apply to all permanent trees on the subject site. No matter what pruning methods are used, no more than one -third of the crown shall be removed in any one growing season. A. When necessary to improve visibility for public safety purposes, suckers of limbs below seven feet in height may be removed through proper crown raising. B. Maintenance of trees shall take their natural shape and growth patterns into account. Trees that are intended to grow full to the ground, such as magnolias, shall not be limbed up. C. No topping or heading back shall be permitted which involves the cutting of limbs back to a stub, bud, or lateral branch not large enough to assume the terminal role. Crown reduction shall be used to reduce the size of a tree and is best accomplished by cutting limbs back to laterals that are at least one-third the diameter of the parent limb. 5. During construction approved site/landscaped plans must be kept on site. 6. Removal of trees after issuance of a certificate of occupancy for a commercial or multi - family residential project in the overlay district is prohibited without the approval of the zoning administrator planning department. l. Open space, landscaping and buffering requirements. 1. The minimum area required for open space shall be 25 percent of the site for commercial uses and 40 percent of the site for multifamily residential uses. The buffer yards, setbacks, and retention/detention pond areas may be included in calculating the required open landscaped area. Where a portion of a larger undeveloped tract is being developed, only landscaped areas reasonably associated with the project as determined by the zoning administrator planning department shall be counted in meeting the requirements of this provision. 2. Application requirements. (i) An application for approval of the site plan, including the landscape plan, shall be submitted to the zoning administrator planning department, with the number of copies set by them, along with the appropriate fee. (ii) The site/landscape plan shall include the following (unless waived by the development official): A. Name of the project. Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 21 of 24 B. Tax parcel number. C. Acreage or square footage of the lot/parcel. D. Acreage or square footage being disturbed. E. Dimension of the lot/parcel on which the project is situated. F. Graphic scale and north arrow. G. Name, address and phone number of the property owner. H. Name, address and phone number of the preparer. I. Zoning of the site. J. Location map at a scale sufficient to depict the exact location of the site. K. Calculation of the area of the total site required to be landscaped as open space and that's actually provided. L. In the tree protection area, the location, type, and caliper of all grand and significant trees, indicating those to be removed and existing trees to be counted in meeting the requirements for buffer yards. M. The total DBH of significant trees in the tree protection areas and the total DBH of such significant trees being removed. N. The protected area required around each grand and significant tree based on the one-foot radius for each inch DBH. O. A statement of the total caliper of the replacement inches required and the total caliper of those provided. P. Clear delineation of the limits of clearing. Q. The number, location, and botanical and common names of plants to be installed along with the caliper of the required trees, a clear indication of the areas to be seeded or sodded and a drawing of all the shrubbery, berms and fences. R. A notation that protective measures for trees, installation methods for new plant material, maintenance of landscaped areas, and maintenance and pruning of trees and shrubs will comply with the standards established by this section and the county staff. S. Other information as required by county staff to facilitate review. 3. Landscaping in vehicular use areas. (i) Each parking area should be defined by linear landscaped areas to delineate driveways and control traffic flow. Such linear landscaped areas should be at least eight feet in width and include canopy trees as determined by the zoning administrator planning department unless such trees would interfere with traffic movement in which case other types of trees may be used. (ii) Islands between parking spaces should be provided when more than one double bay of parking spaces, no more than ten spaces are allowed in a row without a landscaped island of at least 300 square feet excluding curbing and having a minimum width of eight feet. Each such island shall have at least one canopy tree allowed in parking lots as set forth in the approved tree list. Such Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 22 of 24 islands must be offset so that they are evenly distributed in the parking area and are not in straight lines. (iii) At the end of each row of parking spaces a landscaped island of at least 100 square feet in area shall be provided closest to a building; each such island shall have a berm two feet high planted with ground cover or where there are two such islands together totaling at least 200 square feet, a small tree planted as set forth in the approved tree list. A landscaped island of at least 150 square feet shall be provided at the ends of each single row of parking spaces nearest the street frontage; where there are two such islands together total ing at least 300 square feet, there shall be one canopy tree. The islands shall be designed and maintained so as not to obstruct visibility for motorists. The zoning administrator planning department may modify or waive this provision if compliance would not be practical. (iv) I slands shall be located to preserve the maximum number of existing trees. The maximum number of trees must be planted as determined by the zoning administrator planning department taking into account the size of the trees at maturity. The zoning administrator planning department shall approve the size, type and location of the trees. Any combination of large and small trees may be planted to meet the minimum number required by this provision with the approval of the zoning administrator planning department. (v) Dumpsters, utility boxes and similar structures must be screened. 4. A detention pond may be counted as open landscaped area unless it is unable to support healthy trees, as determined by the county. Each detention pond shall be screened for aesthetic purposes. A lake shall be counted as landscaped area if approved by the zoning administrator planning department as affecting the purpose of this section. 5. Landscaping installed during the development should meet the following design standards. (i) Landscaping should be designed for the long term; the size of plants at maturity should be considered when selecting plant material and designing its installation. (ii) Landscaping should continue thematic elements, if any, found in the surrounding area, including plant types and planting patterns. (iii) Landscaping should be designed to be functional (reducing heat, controlling runoff, etc.). 6. Irrigation systems must be installed to water all new landscaped areas. The system must remain operational and have a timer set to water plantings to keep them alive. 7. All landscaping shall be installed in accordance with the approved landscape plan unless substitutions are approved by the zoning administrator planning department and noted in writing on the plan. A certificate of occupancy for any business or use on a site with such an approved plan shall not be issued until the required landscaping is installed by the property owner and approved by the zoning administrator planning department or a cash equivalent performance guarantee is posted with the zoning administrator planning department in the minimum amount of 110 percent of the total cost of the required uncompleted landscaping, including the labor, as determined by the zoning administrator planning department. A site not requiring a certificate of occupancy may not be used until the required landscaping is installed or a guarantee posted. The guarantee and accompanying surety shall be in a form approved by the zoning administrator planning Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 23 of 24 department and shall be released and returned to the party posting the guarantee upon installation by the property owner of all required landscaping and acceptance by the zoning administrator planning department of such installation. The landscaping shall be installed within three months of the posting of the performance guarantee with the county. However, the zoning administrator planning department may extend the time for installation of landscaping for a maximum of an additional three months if weather conditions are not suitable for such installation or trees are not available during the initial three-month period. If the landscaping is not installed within the required period, the guarantee shall be forfeited to and used by the county to complete the approved landscaping with any remaining funds being returned to the party who posted the guarantee. For a project in an unincorporated area receiving city services and for which a landscape plan has been approved, the use of those services may not commence until the requirements of this section are met. 8. The property owners, occupants, and tenants or their agents shall be jointly and severally responsible for the maintenance of all landscaping. All landscaping required by or installed pursuant to landscaping plans approved under this section or prior ordinances shall be maintained in good condition so as to present a healthy, neat and orderly appearance; shall be kept free of refuse, debris, and dead, diseased, or severely damaged plants or vegetation; and shall contain at all times the number, variety, and location of plants and trees required thereby. 9. Bufferyard requirements inside of the Highway Overlay District. Table 3 Bufferyard Requirements Existing Use Proposed Use Agricultural Single-Family Dwelling, RD Single-Family Dwelling All Other Residential Office/Instituti onal Commercial/N on-Effluent Effluent Producing Street Office/Institutional 1 3 2 1 1 1 1 3 Multifamily/Manufactured Home and RV Parks 3 3 3 3 3 3 3 3 Low Impact Commercial 1 3 2 1 1 1 1 1 Commercial 1 4 3 2 1 1 1 1 Non-Effluent Producing Industry 2 5 4 3 2 1 1 5 Effluent Producing Industry 5 5 5 5 5 5 1 5 Type Bufferyard Width Plants per 100 Feet Created: 2022-08-31 10:20:48 [EST] (Supp. No. 16) Page 24 of 24 1 5 feet 2 large trees 2 small trees 6 shrubs 2 10 feet 3 large trees 4 small trees 12 shrubs 3 15 feet 4 large trees 6 small trees 24 shrubs 4 25 feet 6 large trees 8 small trees 36 shrubs 5 50 feet 8 large trees 12 small trees 54 shrubs m. If the Highway Overlay conflicts with any other regulations, including the permitted uses of the zoning districts, the more restrictive and stringent regulations shall prevail. n. Non-residential and multifamily projects within the overlay districts must comply with all other applicable provisions of the land management regulations. (Code 1999, § 152.020; Ord. No. 99-00-380, § 2.1, 4-4-2000; Ord. No. 05-06-577, 6-14-2006; Ord. No. 09-10-624, §§ 1, 2, 8-10-2010; Ord. No. 12-13-658, §§ 1, 2, 3-5-2013; Ord. No. 12-13-660, § 2, 4-2-2013; Ord. No. 12-13-667, § 1, 7-2-2013; Ord. No. 19-20-764, § 1, 11-5-2019; Ord. No. 20-21-796, § 1(Exh. A), 2-1-2022) Created: 2022-08-31 10:20:52 [EST] (Supp. No. 16) Page 1 of 1 Sec. 24-252. Land development other than a subdivision. (a) No building permit shall be issued for a shopping center; apartment or condominium complex; commercial, business commercial business park, or industrial park; manufactured home park; or other multi-use or multi- occupant projects, unless and until an applicant for such use submits to the planning administrator department the following: (1) A plat and/or site plan with date and scale, showing the actual shape and dimensions of the lot to be built upon; the size, height, and location on the lot of existing and proposed buildings and structures; the intended use of each building, the number of units the building is designed to accommodate; stor m water analysis and control plan, flood and wetland areas; traffic study, proposed parking, driveways, street ROW and interior circulation pattern, proposed bufferyard, open space and landscaping; building elevations; and contiguous off-site development. (2) Grading, erosion and sediment control plan. (3) All required permits of other state and local agencies. (b) The planning commission shall hear and evaluate the application in relation to the following design and improvement criteria. (1) Ingress and egress to the project site shall be designed to maximize automotive and pedestrian safety and facilitate traffic flow. (2) Off-street parking, off-street loading, refuse, and service areas shall be designed to minimize their visual and physical impact on neighboring property. (3) Street right-of-way and pavement construction shall be adequate to accommodate the type and volume of traffic anticipated. (4) The project shall be designed in harmony accordance with its physical surroundings the comprehensive plan and in such a manner as to ensure land use compatibility. (c) If, upon review of these standards, the project is determined to be in compliance, the planning commission shall approve the land development application and cause the issuance of a buil ding permit. (d) Any proposed changes to an approved project shall be resubmitted and reevaluated in light of the above. (Code 1999, § 152.132; Ord. No. 99-00-380, § 8.6-6, 4-4-2000; Ord. No. 12-13-660, § 47, 4-2-2013)

Source: Edgefield County website. First collected Oct 26, 2026.