04.07.2025 Agenda E Packet Part # 2 (Item #13 Thru Item #18)
Jasper County · Jasper County · meeting of Apr 7, 2025 · Agenda packets
Open the original document More from Jasper County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Page 1 of 4
STATE OF SOUTH CAROLINA
COUNTY OF JASPER
ORDINANCE #O-2025-09
AN ORDINANCE
OF JASPER COUNTY COUNCIL
To amend and re-number the Jasper County Code of Ordinances, Chapter 2
Administration, Article II County Council, Division 1, Generally, being
codified as Section s 2-31 through Section 2-33C, Repealing as of July 1,
2025 Ordinance 08 -20 adopting Jasper County Personnel Policies and
Procedures Manual, as Amended , and Adding a New Section 2 -72 in Article
III, Officers and Employees, Regarding the Adoption of Personnel System
Policies and Procedures.
WHEREAS, the Jasper County Code of Ordinances, Chapter 2 Administration, Article
II County Council, Division 1, Generally, and being codified at Sections 2 -31 through
Section 2-33C of the Jasper County Code of Ordinances (the “Division 1 sections”) h as
been previously amended from time to time since its initial adoption in 1976; and
WHEREAS, The Jasper County Council periodically review s County Ordinances for
relevance and adjustment , and in such review, has determined certain further
amendments are desirable to the referenced Division 1 sections;
NOW THEREFORE BE IT ORDAINED by the Jasper County Council in council
duly assembled and by the authority of the same:
Section 1. The Jasper County Code of Ordinances, Chapter 2 Administration, Article
II County Council, Division 1, Generally, being codified as Section 2 -31 through Section
2-33C, is amended by deleting Sections 2 -31 through 2 -33C in their entirety, and
replacing those sections with the substitute re-numbered Sections 2-21 through Section
2-27 as set forth in the attached Exhibit “A” following.
Section 2. Former Section 2 -33, “At Will Employment” , is renumbered and inserted
as new Section 2-71 in Chapter 2 Administration, Article III Officers and Employees of
the Code of Ordinances, as set forth in Exhibit “A” attached.
Section 3. Ordinance 08 -20 enacted on July 21, 2008, as amended thereafter,
adopting the Jasper County Personnel Pol icies and Procedures Manual is repealed as of
July 1, 2025, and the Jasper County Personnel Pol icies and Procedures Manua l is also
repealed as of that date.
Section 4. A new Section 2 -72, Adoption of personnel policies , is inserted in Chapter
2 Administration, Article III Officers and Employees of the Code of Ordinances , as set
forth in Exhibit “A” attached.
Section 5. Severability.
If any section, clause, paragraph, sentence or phrase of this ordinance shall, for any
reason, be held to be invalid or unconstitutional, such invalid section, clause,
paragraph, sentence or phrase is hereby declared to be severable; and any such invalid
or unconstitutional section, clause, paragraph, sentence or phrase shall in no way affect
the remainder of this ordinance; and it is hereby declared to be the intention of the
County Council that the remainder of this ordinance would have been passed
notwithstanding the invalidity or unconstitutionality of any section, clause, paragraph,
sentence or phrase thereof.
Section 4. Effective Date.
This Ordinance shall take effect upon approval by Council.
SIGNATURES FOLLOW
_________________________
John A. Kemp
Chairman
ATTEST:
_________________________
Wanda Giles
ORDINANCE: O-2025-09 Clerk to Council
First Reading: March 17, 2025
Second Reading: April 7, 2025
Public Hearing: April 7, 2025
Adopted: _____________
Exhibit A is attached and incorporated by reference
Reviewed for form and draftsmanship by the Jasper County Attorney.
__________________________ _______________
David Tedder Date
EXHIBIT A
- CODE OF ORDINANCES
Chapter 2 - ADMINISTRATION
ARTICLE II. - COUNTY COUNCIL
DIVISION 1. GENERALLY
Page 1 of 4
DIVISION 1. GENERALLY
(Renumber Article II by taking 2-20 through 2-30 from Article I)
Sec. 2-21. Composition; residency of members.
The county council shall consist of five members elected at-large county-wide; provided, that each of the
four township districts shall be entitled to have one of its residents elected to Council, and the fifth member of
council may be a resident of any of the four township districts.
(Ord. of 6-25-76(1))
State law reference(s)—Membership of council, S.C. Code 1976, § 4-9-610.
Sec. 2-22. Duties of chairperson
(a) The chairperson shall preside at all meetings of the council. The chairperson, on behalf of the council,
will execute all ordinances, resolutions, directives, deeds, bonds, contracts and other official documents
unless execution is otherwise directed by ordinance or other council action. The chairperson shall also
have such other duties and perform such other functions as these rules specifically set forth or as the
council specifically directs
(b) Additional Duties. The chairperson will devote the time necessary to:
(1) Attend and report on meetings of the county planning commission.
(2) Attend and report on meetings and activities of the Beaufort/Jasper Water and Sewer Authority.
(3) Establish, attend and report on joint county issues with Beaufort County.
(4) Establish, attend and report on county issues with Jasper County municipalities.
(5) To continue to carry out the normal duties of chairperson.
(c) The chairperson may delegate another council member to attend meetings on behalf of the council in the
event the chairperson is unable to attend
Sec. 2-23. Election of chairperson.
At its initial meeting in January, the council shall elect one of its members to serve as chair person for a term
of one year. So long as the chairperson remains a member of the county council in good standing, he or she shall
serve as chairperson until a successor is selected in accordance with these rules. A member may be elected for
successive terms. If the office of the chairperson becomes vacated, the vice-chairperson shall immediately become
chairperson.
Sec. 2-24. Duties and election of vice chairperson.
At its initial meeting in January, the council shall elect one of its members to serve as vice chairperson for a
term of one year. So long as the vice chairperson remains a member of the county council in good standing, he or
]
Page 2 of 4
she may serve successive terms as a vice chairperson. The vice chairperson shall preside at meetings of the council
when the chairperson is absent or unable to preside. In the absence or disability of the chairperson or in the event
the office of the chairperson should be vacant, the vice chairperson, on behalf of the council, will execute all
ordinance, resolution, directive deeds, bonds, contracts and other official documents unless execution is otherwise
directed by ordinance or other council action. If the office of vice chairperson becomes vacant, at the next meeting
following the occurrence of the vacancy, council shall choose one of its members to serve as vice chairperson for
the remainder of the term.
Sec. 2-25. Duties and identification of chairperson pro tempore.
If at any time both the chairperson and the vice chairperson are absent or vacancies exist in both offices, the
council members in attendance will elect from among themselves a chairperson pro tempore who shall serve
temporarily as chairperson until the existing chairperson (or vice chairperson) is able to resume his duties, or the
vacancies are filled.
Sec. 2-26. Councilmembers.
Council members shall strive to attend all regular and special meetings of the county council and shall
hold themselves at all times in readiness to perform any duty entrusted to them by county council. The council
members shall perform the duties thus imposed upon them with dispatch and to the best of their abilities.
All council members have a responsibility to adhere to the highest ideals of civility and decorum while
participating in all meetings conducted on behalf of the community. In doing so, council members are expected to
abide by the decorum guidelines contained herein and shall, at all times, honor the public trust and dignity
bestowed upon them as elected community leaders. The council shall cooperate and support the chairperson in
maintaining order and civility throughout council meetings.
Council members may attend meetings of county boards and commissions but shall not participate in
board or commission discussions except by specific direction of county council or when the meeting relates to
their property.
Sec. 2-27. Communications.
The Chairperson will strive to relate to and communicate with the county administrator and with the
county council as a whole any and all problems, situations and conditions which arise concerning any department
or activity of the county. Except for the purpose of inquiry, the members of the county council shall communicate
only with the chairperson and county administrator in any and all matters concerning any department or activity of
the county.
Sec. 2-27. Compensation of the chairperson and council members.
(a) Base annual pay. The members of council shall receive base annual pay for each fiscal year as follows:
(1) Councilmember. Each member of council, with the exception of the chairperson, shall receive
$16,463.00; and
(2) Council chair person. The chairperson of council shall receive $16,463.00; and an additional $1,000.00
to compensate for the additional duties and responsibilities.
(3) Cost of living. Any cost of living increase approved in an annual budget for county employees shall also
apply to councilmembers' salary. However, the effective date of any such cost of living increase for all members of
council shall be the first of January following a general election where two or more members of council have been
elected.
Page 3 of 4
(b) Mileage reimbursement. Each member of council shall be reimbursed mileage to and from their residences for
travel outside Jasper County for official business, at the rate as published annually by the U.S. Internal Revenue
Service.
(c) Benefits. Council members shall be eligible to receive health insurance benefits for themselves and their
spouse and dependents upon the same basis as county employees , and are required to participate in the county
retirement program with the State or in the alternative, should the council member elect, may enroll in the 457
Plan through Mission Square Retirement with the bi-weekly contribution made by the county on the
councilmember’s behalf being capped at $225.00.
(d) Expenses. Expenses for council members will be limited to the amounts and types of expenses provided for
employees in the County Personnel Manual. Members of council may also be reimbursed for actual expenses
incurred in the conduct of their official duties, including reasonable costs for overnight travel, lodging, meals, and
incidental expenses where such travel outside the County is necessary and appropriate. Airfare shall be at the
lowest available coach fare. Destination travel shall be by local bus, shuttle, ride share, taxi, Uber©, Lyft©, or lowest
available car rental cost. Advances may be made, but costs must be reconciled immediately following any such
travel.
(d) Method of payment. Base annual pay shall be divided into 26 equal payment s and made biweekly through the
normal payroll cycle. Payment of the mileage will be made no later than the second scheduled pay date of each
month following the month in which the mileage was claimed; i.e., for meetings attended in January, payment
would be made on the second payroll check paid in the month of February, etc.; and
(e) Required documentation. An affidavit form must be completed and signed by the councilmember,
countersigned by the Chairperson or Vice-Chairperson, and submitted to the finance department in order for
payment of the mileage/expenses to be made. The affidavit shall provide for the recording of the date, location,
total mileage to and from, and the purpose of the meeting.
Sec. 2-71. "At will" employment policy. (TO BE MOVED FROM OLD SECTION 2-33.C AND
PLACED INTO ARTICLE III, OFFICERS AND EMPLOYEES)
(a) All employees of the county are employed "at will" and may resign or be discharged from employment at any
time.
(b) Only county council shall have the right to enter into contracts for other than "at will" employment on the
county's behalf and that any contract for other than "at will" employment must:
(1) Be in writing
(2) Be executed by the council
(3) Specify the duration of the employment; and
(4) Specifically state that the contract is being created pursuant to the council's authority under this
section.
Sec. 2.72. Adoption of personnel policies (NEW SECTION ADDED TO ARTICLE III, OFFICERS
AND EMPLOYEES)
Page 4 of 4
(a) County Council may, from time to time develop personnel system policies and procedures
for county employees by which all county employees are regulated except those directly
elected by the people; to that end, County Council shall by resolution adopt and amend
such personnel system policies as it sees fit from time to time in an “Employee
Handbook”, with such to be provided to each new employee and the current version of
the Employee handbook available on the County’s web site and in the Human Resources
Office.
(b) Adoption of a handbook, personnel manual, procedure or other document shall not
create an express or implied contract of employment (see Section 2-71 above and § 41-1-
110 of the Code of Laws of South Carolina) and each such document shall contain a
conspicuous disclaimer compliant with § 41-1-110 and signed by the employee, with a
copy of the employee’s acknowledgment that he/she received a copy of the Handbook
to be made a part of the employee’s personnel record.
1
STATE OF SOUTH CAROLINA
JASPER COUNTY
ORDINANCE #O-2025-10
ORDINANCE OF JASPER COUNTY COUNCIL
An Ordinance authorizing the sale to 719 Holdings, LLC of 1.139
acre parcel, more or less , being subdivided out of the original 19.09
acre Parcel identified as Parcel B as shown on a Plat recorded at
Plat Book 27 at Page 80, being a portion of tax parcel 048 -00-01-
005, and to authorize the Jasper County Administrator to execute
such contracts, amendments, deeds and other documents as may be
necessary and appropriate to effect the sale to 719 Holdings, LLC, or
its assigns, and matters related thereto.
WHEREAS, Jasper County and 719 Holdings, LLC have negotiated the terms of
a proposed Contract for the Purchase and Sale of Commercial Real Property
(“Agreement”) between them by which Jasper County would sell , and 719
Holdings, LLC would purchase a parcel of land totaling approximately 1.139 acres
located at the Cypress Ridge Industrial Park , said parcel being a portion of TMS
048-00-01-005, in order to establish a new commercial enterprise; and
WHEREAS, Addendum #1 to the Agreement provides that it is not valid,
binding, or enforceable unless and until ratified by Jasper County Council within
30 days of Jasper County Administrator executing the Agreement; and
WHEREAS, in accordance with South Carolina law, Jasper County Council
must pass an ordinance authorizing the sale of real property; and
WHEREAS, a new subdivision survey of the 1.139 acre more or less parcel to be
conveyed has been commissioned , and County Council desires to utilize this
survey as the legal description of the property in the deed and related documents;
and
WHEREAS, Jasper County Council finds th e terms of the Agreement to be fair,
equitable and in the best interests of the citizens of Jasper County , and in
furtherance of additional economic development within the County;
NOW THEREFORE, BE IT RESOLVED by Jasper County Council, in council
duly assembled and by the authority of the same:
2
1. Jasper County Council adopts the foregoing recitals as part of this
Ordinance, ratifies the execution of the Contract for the Purchase and Sale
of Commercial Real Property ( “Agreement”) as required by Addendum # 1
to the Agreement, and approves the sale of the referenced County
property, as generally described by the subdivision sketch map attached
hereto as Exhibit “A,” with the final legal description to be derived from
the new survey being prepared and to be approved by the County
Administrator upon the terms and conditions of the Agreement to 719
Holdings, LLC, or its assigns;
2. The Jasper County Administrator , with the assistance of the County
Attorney, is further authorized to execute and deliver a deed, closing
statements and such other documents as may be necessary or desirable to
accomplish the transfer of title to the property to the purchaser this
transaction as more particularly described in the Agreement, as modified.
3. In connection with the execution and delivery of the deeds and other
documents authorized hereunder, the County Administrator, with the
advice and counsel of the County Attorney, and the law firm of Harvey &
Battey, PA, is fully authorized to prepare, review, negotiate, execute,
deliver, and agree to such additional agreements, amendments,
certifications, documents, closing proofs, and undertakings as he shall
deem necessary or advisable.
4. Any actions previously undertaken by the County Administrator, County
Council or County staff in connection with the execution and delivery of
the contracts, contract amendments, deeds, including the negotiation of
the terms related thereto and any other agreements prior to the enactment
of this Ordinance are ratified and confirmed.
5. This Ordinance shall take effect upon approval of the Council.
Done this ______ day of _______________, 2025.
_________________________________
John A. Kemp, Chairman
ATTEST:
_________________________________
Wanda Giles, Clerk to Council
3
ORDINANCE 2025-O- ___
First Reading: _________
Second Reading: _________
Public hearing: _________
Adopted: _________
Reviewed for form and draftsmanship by the Jasper County Attorney.
_______________________________________
David L. Tedder Date: _______________
4
Drawing of Area to be Conveyed
(To be Replaced with Recordable Survey)
Page 1 of 3
STATE OF SOUTH CAROLINA
COUNTY OF JASPER
ORDINANCE # 0 -2025-______
AN ORDINANCE OF JASPER COUNTY COUNCIL
To amend the Jasper County Code of Ordinances by repealing
Chapter 28, Utilities, Articles II through IV in their entirety and
replacing them with a new Article II
WHEREAS, The Jasper County Council has undertaken to periodically
review County Ordinances for relevance and adjustment; and
WHEREAS, The Jasper County Council realizes Ordinances may from time
to time become out date d, no longer valid , or may need enhancement or
revision; and
WHEREAS, pursuant to the powers and authorities granted to counties
under Home Rule Act of 1975, and specifically Title 4, Chapter 9 of the Code
of Laws of South Carolina, counties may establish or abolish agencies,
departments, boards, commissions , and positions in the county in
accordance with § 4-9-30 of the Code of Laws of South Carolina; and
WHEREAS, the provisions of Article II of Chapter 28, Hardeeville Area Water
Quality Management Agency, and Article III, Beaufort-Jasper County Water
Authority are no longer necessary due to the acquisition by the Beaufort -
Jasper Water and Sewer Authority of the City of Hardeeville water and sewer
system in 2002 , and the assumption by the Beaufort -Jasper Water and
Sewer Authority of various water supply and distribution functions as well as
collection, treatment, disposal and recycling of wastewater in Jasper County,
pursuant to South Carolina 2009 Act No. 55, codified as Sections 6 -37-10,
et seq., and
WHEREAS, 2009 Act No 55, Section 2 , effective June 2, 2009, specifically
provides:
Page 2 of 3
“The provisions of this act are intended to supersede all other legislative acts or
actions of a county council which are inconsistent with this act. Therefore, all other
legislative acts or actions of a county council taken to date concerning the
establishment of the authority that are inconsistent with this act are hereby
repealed to the extent of such inconsistencies."
NOW THEREFORE, BE IT ORDAINED , by the Japer County Council duly
assembled and by the authority of the same;
1. The Hardeeville Area Water Quality Management Agency, established
by Jasper County Ordinance of 1-7-80, such ordinance being codified
at Sections 2 8-36 through 28-41 (with Sections 28 -42 through 28 -70
reserved) is hereby abolished, and Article II of Chapter 28, Hardeeville
Area Water Quality Management Agency, is deleted in its entirety.
2. Article III of Chapter 28 is hereby renamed “Article II, Beaufort-Jasper
County Water and Sewer Authority, and all Sections of such prior Article
III are deleted, with the exception of a new Section 28 -36, to read as
follows:
Sec. 28 -36. Water and Sewer. For provisions regarding the
provision of water and sewer facilities in Jasper County, including
the authority, jurisdiction, appointment of members and other
matters regarding the Beaufort-Jasper Water and Sewer Authority,
reference may be had to 2009 Act No. 55, codified at Sections 6 -
37-10, et seq. of the Code of Laws of South Carolina, as such may
hereafter be amended.
3. Article IV, Rural Water System , is hereby deleted in its entirety, with
Code Sections 28-37 through 2-113 to be shown as “Reserved.”
4. Pursuant to the requirements of Section 2 of 2009 Act 55, provisions of
ordinances previously adopted by County Council, which are not
consistent with the provisions of 2009 Act No. 55, are deemed
superseded and repealed.
Page 3 of 3
5. If any section, clause, paragraph, sentence or phrase of this ordinance,
or application thereof any person or circumstances must, for any reason
be held to be invalid or unconstitutional. The invalid section, clause
paragraph, sentence, phrase or application shall no way affect the
remainder of this ordinance: and is hereby declared to be the intention
of the County Council that the remainder of this ordinance would have
passed notwithstanding the inv alidity or unconstitutionality of any
section, clause paragraph, sentence or phrase thereof.
6. This ordinance shall take effect upon approval by Council.
John A. Kemp, Chairman
Attest:
_______________________________
Wanda Giles, Clerk to Council
Ordinance O-2025-_______
First Reading:
Public Hearing:
Second Reading:
Third Reading:
Adopted:
Reviewed for form and draftsmanship by Jasper County Attorney
___________________________________
David L. Tedder Date
Page 4 of 3
- CODE OF ORDINANCES
Chapter 28 UTILITIES
Jasper County, South Carolina, Code of Ordinances Created: 2025-03-04 13:45:48 [EST]
(Supp. No. 4)
Page 1 of 9
Chapter 28 UTILITIES1
ARTICLE I. IN GENERAL
Secs. 28-1—28-35. Reserved.
ARTICLE II. HARDEEVILLE AREA WATER QUALITY MANAGEMENT AGENCY2
Sec. 28-36. Definitions.
The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them
in this section, except where the context clearly indicates a different meaning:
201 refers to section 201 of PL 92-500, the Federal Water Pollution Control Act, as amended.
Nonpoint source pollution means pollutants which are not collected or centralized. Stormwater runoff is a
major nonpoint source.
Point source facilities means waste treatment facilities and the collection system through which wastewater
is transmitted to a single point for processing.
Point source pollution means wastewater which is collected and transferred to a single point or place.
(Ord. of 1-7-80, § 6)
Cross reference(s)—Definitions generally, § 1-2.
Sec. 28-37. Designation.
(a) The Town of Hardeeville is hereby designated as the water quality management agency for the area
described by section 28-38, with powers and duties as defined by section 28-39, to control both point and
nonpoint source pollution.
(b) The county is designated as a supplemental agency for the unincorporated portions of the area described in
section 28-38, with powers and duties as defined in section 28-39, to manage point sources.
(Ord. of 1-7-80, § 1)
1Cross reference(s)—Buildings and building regulations, ch. 6.
State law reference(s)—Authority to grant franchises for public utilities, S.C. Code 1976, § 4 -9-30(11).
2Cross reference(s)—Boards, commissions and committees, § 2-76 et seq.
Created: 2025-03-04 13:45:48 [EST]
(Supp. No. 4)
Page 2 of 9
Sec. 28-38. Jurisdiction.
The area over which the Town of Hardeeville shall have jurisdiction for water quality matters shall coincide
with the boundaries of the approved and certified 201 facilities plan for Hardeeville, as delineated by the map
attached to the ordinance from which this article is derived, which is made a part of this article by reference.
Where uncertainty exists as to the boundaries of the 201 planning area, the following rules shall apply:
(1) Boundaries indicated as approximately following the center of streets, highways, railroad lines, utility
easements, streams, rivers, lakes, canals and other bodies of water shall be construed to follow such
centerlines.
(2) Boundaries indicated as approximately following platted lot lines and corporate lines shall be
construed as following such lines.
(3) Boundaries indicated as parallel to or extensions of features indicated in subsections (1) and (2) of this
section shall be so construed. Distances not specifically indicated on the 201 map shall be determined
by the scale of the map.
(Ord. of 1-7-80, § 2)
Sec. 28-39. Powers and duties.
(a) The Town of Hardeeville shall have the authority to exercise the following powers and duties within the area
defined by section 28-38:
(1) To annually review and establish 201 facilities priorities for water quality projects.
(2) To ensure implementation of the approved 201 facilities plan by:
a. Enforcing uniform sewer use regulations for the entire area, to include, among other things, the
authority to mandate tie-ons where sewer lines are available.
b. Enforcing regulations to control the location of waste treatment facilities within the area.
c. Establishing policies and procedures to ensure areawide consideration of water quality matters.
d. Enforcing user charges and industrial cost recovery systems (UCICR) to ensure that each recipient
of waste treatment service will pay its proportionate share of the costs of operation and
maintenance, including replacement, as required by EPA.
(3) To provide water and sewer utility service to the incorporated and unincorporated parts of the area, in
accord with the 201 plan.
(b) The county shall enact sewer use ordinances and other measures deemed appropriate by both jurisdictions,
which shall be consistent with those of the Town of Hardeeville, the designated management agency. The
county shall authorize the town to enforce such ordinances in the unincorporated portions of the 201
facilities planning area for purposes of ensuring proper administration of the service facilities.
(Ord. of 1-7-80, § 3)
Sec. 28-40. Exceptions to sewer connection requirements.
In the implementation of the 201 plan it may be necessary to require tap -ins to existing or proposed
wastewater collection lines. Such authority will be contained in the sewer use ordinance of the Town of
Hardeeville. However, to avoid undue hardships, those dwellings with properly functioning septic tanks, on -site
Created: 2025-03-04 13:45:48 [EST]
(Supp. No. 4)
Page 3 of 9
disposal systems or wells will be exempt from the requirements of the sewer use ordinance or any other
regulatory ordinance requiring tap-ins for a period of five years from the date the service is first made available.
(Ord. of 1-7-80, § 4)
Sec. 28-41. Financial assistance for sewer connection expenses.
To the extent that financial assistance is available from other local, state or federal agencies, the Town of
Hardeeville will work to obtain monies to assist low- and moderate-income persons with tap-in fees and other
related expenses.
(Ord. of 1-7-80, § 5)
Secs. 28-42—28-70. Reserved.
ARTICLE III. BEAUFORT-JASPER COUNTY WATER AUTHORITY
Sec. 28-71. Consolidation of Beaufort-Jasper County water authority and Jasper County water
and sewer authority.
The Beaufort-Jasper County water authority, initially created by Act No. 784 of 1954, as amended, shall be
enlarged by adding thereto all of Jasper County except for any municipalities which operate water and sewer
systems and except the area presently being served by any municipally owned waterworks and sewer system by
consolidating the Jasper County water and sewer authority as created by Act No. 598 of 1971 into the Beaufort -
Jasper County water authority.
The District of the Beaufort-Jasper Water and Sewer Authority (BJWSA) shall be restricted to exclude all of
unincorporated Jasper County, except for those areas of unincorporated Jasper County where infrastructure built
by BJWSA is already in place and serving water or sewer customers in Jasper County, including areas at Point South
and Palm Key. A boundary survey of any such regions will be provided at or before the earliest of: the date that a
true and accurate survey of those areas is provided to Jasper County by the BJWSA, 90 days from the passing of
this resolution.
(Ord. of 10-3-83, § 1; Ord. of 6-2-97, § 1)
Sec. 28-72. Membership.
The composition of the Beaufort-Jasper County water authority shall be as follows: The authority shall be
composed of nine members, seven of whom shall be resident electors of Beaufort County and two of whom shall
be resident electors of Jasper County. The Beaufort County members of the authority shall be appointed by the
governor upon the recommendation of a majority of the legislative delegation of Beaufort County. Of the Beaufort
County members, the respective governing bodies of the City of Beaufort, th e Town of Port Royal and the Town of
Bluffton shall each recommend to the legislative delegation of Beaufort County one person who may in turn be
recommended by the legislative delegation of Beaufort County to the governor for appointment, and the Beaufort
County council shall recommend to the legislative delegation of Beaufort County three persons who shall in turn
be recommended by the legislative delegation of Beaufort County to the governor for appointment. The Jasper
County members of the authority shall be appointed by the governor upon the recommendation of a majority of
the legislative delegation of Jasper County. Of the Jasper County members, the respective governing bodies of the
City of Ridgeland and the City of Hardeeville shall each recommend to the legislative delegation of Jasper County
Created: 2025-03-04 13:45:48 [EST]
(Supp. No. 4)
Page 4 of 9
one person who may in turn be recommended by the legislative delegation of Jasper County to the governor for
appointment. The terms of office for all members and their successors of the authority shall be six years. All
members of the authority shall hold office until their successors have been appointed and qualify. Any vacancy
occurring for any reason among the members of the authority shall be filled for the remainder of the unexpired
term by the procedure set forth in this section.
(Ord. of 10-3-83, § 1)
Sec. 28-73. Compensation of members.
The members of the Beaufort-Jasper County water authority may fix their compensation for each meeting in
actual attendance upon the business of the authority, but in no event shall such compensation exceed $600.00 per
year for each member or $840.00 per year for the chairman.
(Ord. of 10-3-83, § 1)
Sec. 28-74. Continuation of previous authority.
Pursuant to S.C. Code 1976, § 6-11-610, there will be no new commission appointed under this article, nor
will any changes be made in the old members of the Beaufort-Jasper County water authority, as enlarged pursuant
to this article, except as set forth in section 28-72.
(Ord. of 10-3-83, § 3)
Sec. 28-75. Financing of improvements and extensions.
The Beaufort-Jasper County water authority, as enlarged pursuant to this article, will not issue any general
obligation bonds under S.C. Code 1976, §§ 6-11-490—6-11-600. At the present time the authority has no
immediate plans for the issuance of revenue bonds payable from the revenues derived from the operation of its
waterworks system to provide for the funding of the proposed extensions into Jasper County. It is, however,
anticipated that the authority will negotiate with the Farmers Home Administration of the United States
Department of Agriculture with respect to the future financing of the construction of the improvements and
extensions of the waterworks system into Jasper County and for the sale of waterworks revenue bonds to the
Farmers Home Administration. It is anticipated that the negotiations will eventually lead to loans and grants with
which the authority will construct improvements and extensions to the waterworks system into Jasper County.
(Ord. of 10-3-83, § 2)
Secs. 28-76—28-100. Reserved.
ARTICLE IV. RURAL WATER SYSTEM
Sec. 28-101. Establishment.
There is hereby created a body corporate and politic to be known as the county rural water system. It shall
be the function of the system to supply water to individuals, public and private corporations and political
subdivisions within the geographical area specified in this article. To that end, it shall be empowered to drill wells,
construct reservoirs, water treatment, transmission and distribution facilities and appurtenances thereto, and to
Created: 2025-03-04 13:45:48 [EST]
(Supp. No. 4)
Page 5 of 9
acquire such land, rights-of-way, easements, machinery, apparatus and equipment as shall be deemed useful
therefor.
(Ord. of 9-15-80, § 1)
Sec. 28-102. Membership.
The rural water system shall be composed of five members, who shall be resident electors of the county. All
members of the system shall be appointed by the county council. The original appointees shall serve staggered
terms. Upon the termination of the terms of the original members, their successors shall be appointed by the
county council in the same manner as is provided for the original appointment, for terms of four years. Any
vacancy occurring by reason of death, resignation or otherwise shall be fille d for the remainder of the unexpired
term by appointment of the county council. All members of the system shall hold office until their successors shall
have been appointed and shall have qualified.
(Ord. of 9-15-80, § 2)
Sec. 28-103. Officers.
As soon as convenient, the rural water system shall convene and shall organize by electing one of its number
as chairman, a second as vice-chairman and a third as secretary. The terms of office of the officers of the system
shall be for such period as the system shall determine in its bylaws.
(Ord. of 9-15-80, § 2)
Sec. 28-104. Certifications regarding membership and personnel.
The secretary of the rural water system shall from time to time file in the office of the clerk of court of the
county appropriate certificates showing the personnel of the system and the duration of the terms of the
respective members.
(Ord. of 9-15-80, § 2)
Sec. 28-105. Compensation of members.
The members of the rural water system shall receive no compensation, but shall be reimbursed for any
actual expenses incurred in connection with the business of the system.
(Ord. of 9-15-80, § 2)
Sec. 28-106. Service area.
The service area of the rural water system shall encompass all of the county. The system shall not provide
any of its authorized services to persons or private corporations within the established limits of any municipality or
legally constituted water or sewerage district that was in existence at the time of the ratification of the ordinance
from which this article is derived, without the consent of the governing body thereof.
(Ord. of 9-15-80, § 3)
Created: 2025-03-04 13:45:48 [EST]
(Supp. No. 4)
Page 6 of 9
Sec. 28-107. Powers.
The rural water system shall be fully empowered to acquire, construct, operate, maintain, improve and
extend facilities which would enable it to obtain fresh water in large volume and to distribute and sell the water,
subject to the limitations set forth in section 28-106, to persons, firms, corporations, municipal corporations,
political divisions, and the United States government, or any agencies thereof, at any point within its service area.
To that end, the authority shall have the following powers:
(1) To have perpetual succession.
(2) To sue and be sued.
(3) To adopt, use and alter a corporate seal.
(4) To define a quorum for its meetings.
(5) To establish a principal office.
(6) To make bylaws for the management and regulation of its affairs.
(7) To build, construct, maintain and operate canals, aqueducts, ditches, tunnels, culverts, flumes,
conduits, mains, pipes, dikes, dams and water reservoirs.
(8) To impound fresh water in lakes or reservoirs.
(9) To build, construct, maintain and operate water distribution systems for the distribution of water for
domestic or industrial use.
(10) To acquire and operate any type of machinery, appliances or appurtenances necessary or useful to
discharge the functions committed to the authority by this article.
(11) To accept gifts or grants of services, properties or moneys from the United States, or any of its
agencies, under such conditions as the United States or such agency shall prescribe.
(12) Subject to the provisions of section 28-106, to sell water for industrial or domestic use.
(13) To prescribe rates and regulations under which water shall be sold for domestic and industrial use.
(14) Subject to the provisions of section 28-106, to enter into contracts for the sale of water upon such
terms as the parties thereto shall approve, with persons, private corporations, municipal corporations,
public bodies and public agencies and with the United States government or any agencies thereof.
(15) To prescribe such regulations as it shall deem necessary to protect from pollution all water in its canals,
aqueducts, reservoirs or distribution systems.
(16) To make contracts of all sorts and to execute all instruments necessary or convenient for the carrying
on of the business of the system.
(17) To lease or sell and convey lands, or interests therein.
(18) To make use of county and state highway rights-of-way in which to lay pipes and lines, in such manner
and under such conditions as the appropriate officials in charge of such rights -of-way shall approve.
(19) To alter and change county and state highways wherever necessary in order that it may discharge the
functions committed to it in such manner and under such conditions as the appropriate officials in
charge of such highways shall approve.
(20) To acquire, by purchase or gift, or through the exercise of eminent domain, all land, interests therein,
easements and rights-of-way which the authority shall deem necessary to enable it to fully and
Created: 2025-03-04 13:45:48 [EST]
(Supp. No. 4)
Page 7 of 9
adequately discharge all functions committed to it. The power granted in this subsection shall be
deemed to include the power to acquire protective areas of land adjacent to any of its facilities.
(21) To exercise the power of eminent domain for any corporate function. The power of eminent domain
may be exercised through any procedure prescribed by the Code of Laws of South Carolina, 1976, as
such statutes are now constituted or as they may afterwards be constituted following any amendments
thereto.
(22) To appoint officers, agents, employees and servants, to prescribe the duties of such persons, to fix
their compensation, and to determine to what extent they shall be bonded for the faithful
performance of their duties.
(23) To make contracts for construction, engineering, legal and other services, with or without competitive
bidding.
(24) To borrow money and to make and issue negotiable bonds, notes and other evidences of
indebtedness, payable from all or any part of the revenues derived from the operation of its facilities.
The sums borrowed may be those needed to pay all costs incident to the construction and
establishment of the facilities, and any extension, addition and improvement thereto, including
engineering costs, construction costs, the sum needed to pay interest during the period prior to which
the facilities or any extension, addition or improvement thereto shall be fully in operation, such sum as
is needed to apply working capital to place the facilities in operation, and all other expenses of any sort
that the system may incur in establishing, extending and enlarging the facilities. Neither the faith and
credit of the state, nor that of any county, municipality or political subdivision of the state, shall be
pledged for the payment of the principal and interest of the obligations, and there shall be on the face
of each obligation a statement, plainly worded, to that effect. Neither the members of the system nor
any person signing the obligations shall be personally liable thereon. To the end that a convenient
procedure for borrowing money may be prescribed, the system shall be fully empowered to:
a. Covenant and agree that, upon it being adjudged in default as to the payment of any installment
of principal or interest upon any obligation issued by it or in default as to the performance of any
covenant or undertaking made by it, that in such event the principal of all obligations of such
issue may be declared forthwith due and payable, notwithstanding that any of them may not
have then matured.
b. Confer upon a corporate trustee the power to make disposition of the proceeds from all
borrowings and of all revenues derived from the operation of the facilities, in accordance with
and in the order of priority prescribed by the resolutions adopted by the authority as an incident
to the issuance of any notes, bonds or other types of securities.
c. Dispose of its obligations at public or private sale, and upon such terms and conditions as it shall
approve.
d. Make such provision for the redemption of any obligations issued by it prior to their stated
maturity, with or without premium, and on such terms and conditions as the system shall
approve.
e. Covenant and agree that any cushion fund established to further secure the payment of the
principal and interest of any obligations shall be in a fixed amount.
f. Limit or prohibit free service to any person, firm, corporation or municipal corporation, or any
subdivision or division of the state.
g. Prescribe the procedure, if any, by which the terms of the contract with the holders of its
obligations may be amended, the number of obligations whose holders must consent thereto,
and the manner in which such consent shall be given.
Created: 2025-03-04 13:45:48 [EST]
(Supp. No. 4)
Page 8 of 9
h. Prescribe the events of default and the terms and conditions upon which all or any obligations
shall become or may be declared due before maturity, and the terms and conditions upon which
such declaration and its consequences may be waived.
(25) To do all other acts and things necessary or convenient to carry out any function or power committed
or granted to the system.
(Ord. of 9-15-80, § 4)
Sec. 28-108. Rates for services not to be regulated by state.
The rates charged for services furnished by the rural water system shall not be subject to supervision or
regulation by any state bureau, board, commission or like instrumentality or agency thereof.
(Ord. of 9-15-80, § 5)
Sec. 28-109. Tax exemption for property of system.
All property of the rural water system shall be exempt from all ad valorem taxes levied by the state, the
county or any municipality, division, subdivision or agency thereof, direct or indirect.
(Ord. of 9-15-80, § 6)
Sec. 28-110. Fiscal year; annual audit.
The rural water system shall conduct its affairs on the fiscal year basis employed by the county, that is, its
fiscal year shall begin on July 1 of each year and shall end on June 30 of the succeeding year. As shortly after the
close of its fiscal year as may be practicable, an audit of its affairs shall be made by certified public accountants, of
good standing, to be designated by the system. Copies of such audits, incorporated into an annual report of the
system, shall be filed in the office of the clerk of court of the county and with the secretary of state.
(Ord. of 9-15-80, § 7)
Sec. 28-111. Use of revenue.
All revenues derived by the rural water system from the operation of its facilities which may not be required
to discharge covenants made by it in issuing bonds, notes or other obligations authorized by this article shall be
disposed of by the system from time to time for purposes germane to the functions of the system, or in such other
manner as the general assembly may, by proper enactment, direct.
(Ord. of 9-15-80, § 9)
Sec. 28-112. Contracts for sale of water.
All municipalities, public bodies and public agencies operating water district systems in the county shall be
fully empowered to enter into contracts to buy water from the rural water system. Such contracts shall extend
over such period of time and shall contain such terms and conditions as shall be mutually agreeable to the system
and to the contracting municipality, public body or public agency.
(Ord. of 9-15-80, § 10)
Created: 2025-03-04 13:45:48 [EST]
(Supp. No. 4)
Page 9 of 9
Sec. 28-113. Tampering with facilities or polluting water; unlawful use of water.
It shall be unlawful for any person to wilfully injure or destroy or in any manner hurt, damage, tamper with
or impair the facilities of the rural water system, or any part of such facilities, or any machinery, apparatus or
equipment of the system, or to pollute the water in any part of its service area, or to obtain water therefrom
except in accordance with the regulations promulgated by the system. Any person so offending shall be deemed
guilty of a misdemeanor and upon conviction shall be punished in acc ordance with section 1-8 and shall be further
liable to pay all damages suffered by the system.
(Ord. of 9-15-80, § 8)
P age 1 of 1
Jasper County
Finance Department
358 Third Avenue, Post Office Box 1149
Ridgeland, South Carolina 29936
Phone (843) 717-3692 Fax (843) 717-3626
Ki
mberly Burgess, CPA
Director of Administrative Services
kburgessr@jaspercountysc.gov
Jasper County Council
M. B. Kahn Construction Co., Inc.
Capital Planning Services Extension
Meeting Date: April 7, 2025
Subject: Council acceptance of M. B. Kahn Construction Co., Inc., (M. B. Kahn) capital
planning services extension.
Recommendation: The Council accepts M. B. Kahn capital planning services extension in an
amount not to exceed $35,000 for services that do not fall under a specific work
authorization and for the annual update of the capital plan report, and to
authorize the County Administrator to execute all necessary documents.
Description: Jasper County has a construction management at risk contract with M. B. Kahn and
throughout the year requests services from M. B. Kahn for future planning or project support services.
These services fall under a capital planning services agreement for which there is a current not to exceed
(NTE) amount of $60,000. The current capital planning services agreement is at or near the current
limit. Therefore, the M. B. Kahn would like an extension for any 2025 capital planning services in an
amount NTE an additional $35,000 which includes the annual update of the capital plan report. Fiscal
year 2025 expenditures for additional capital planning services under this agreement will be recorded as
Consulting Services (010-062-3772) and any amount remaining for fiscal year 2026 will be budgeted in
the same account.
Recommendation: Staff recommend that the County Council accept the M. B. Kahn Construction Co.,
Inc., 2025 capital plan extension request not to exceed $35,000 and authorize the County Administrator
to execute all necessary documents.
Attachments:
M. B. Kahn Construction Co., Inc. Capital Planning Extension Request
Post Office Box 1179 Columbia, SC 29202 803.736.2950 www.mbkahn.com
NC #1425 FL #CGC056891 (licenses listed per state law)
March 11. 2025
Andrew P. Fulghum, ICMA-CM, County Administrator
Jasper County
PO Box 1149
Ridgeland, South Carolina 29936
Re: Jasper County Capital Planning Extension
Dear Mr. Fulghum:
M. B. Kahn is excited to be a part of the continued growth of Jasper County, and look forward to continuing to support
your staff with planning and management as capital projects are developed and brought from ideas to reality. We have
prepared the following proposal for future planning and project support services. These services include:
Review new/potential capital projects identified by County officials.
Define scopes based on facility walk-throughs and information provided by County officials
Develop conceptual budgets for each project based on agreed upon scope
Provide project detail sheets and photos for each project (per format established in original plan report)
Option for annual update of original report
M. B. Kahn will provide these services based on an hourly cost basis with a not-to-exceed total cost:
Estimator - 100 hours@ $80.00/hr
Senior Estimator - 50 hours @ $125.00/hr
Project Executive - 50 hours @ $175.00/hr
Current NTE amount $60,000
Added NTE for capital planning services extension (2025) $25,000
Added NTE for Annual update of original report (January 28, 2025) $5,000
Total revised NTE amount $90,000
Optional NTE for Annual update of original report (2025-2026) $5,000
Please indicate your acceptance of this proposal by signing below and returning a copy to us for our files. We look
forward to continuing this successful and exciting program!
Sincerely.
M. B. KAHN CONSTRUCTION CO., INC. Jasper County
Craig Floyd Andrew W. Fulghum ICMA-CM
Executive Vice President County Administrator
Craig Floyd
Page 1 of 1
Jasper County
Finance Department
358 Third Avenue, Post Office Box 1149
Ridgeland, South Carolina 29936
Phone (843) 717-3692 Fax (843) 717-3626
K
imberly Burgess, CPA
Director of Administrative Services
kburgessr@jaspercountysc.gov
Jasper County Council
M. B. Kahn Construction Co., Inc.
Temporary Library Upfit Change Order
Meeting Date: April 7, 2025
Subject: Council acceptance of M. B. Kahn Construction Co., Inc. (M. B. Kahn) change
order for the temporary library upfit not to exceed $23,000.
Recommendation: The Council accepts M. B. Kahn change order for the temporary library upfit
not to exceed $23,000 and authorize the County Administrator to execute all
necessary documents.
D
escription: The County Council approved and accepted the Guaranteed Maximum Price (GMP) from
M. B. Kahn Construction Co., Inc. for the Temporar y Library Upfit in the amount of $183,296. The
agreed upon scope of work in the original GMP is complete, however, there are some additional items at
the temporary library location that need to be repaired or replaced. Therefore, M. B. Kahn has prepared
a change order in the amount of $23,000 to address the additional items.
R
ecommendation: Staff recommend that the County Council accept the M. B. Kahn Construction Co.,
Inc., change order not to exceed $23,000 for the temporary library upfit, to authorize that American
Rescue Fund (ARPA) be utilized pay for the change order and to authorize the County Administrator to
execute all necessary documents.
A
ttachments:
M. B. Kahn Construction Co., Inc. Jasper County Temporary Library Upfit Change Order
Page 1 of 1
Jasper County
Finance Department
358 Third Avenue, Post Office Box 1149
Ridgeland, South Carolina 29936
Phone (843) 717-3692 Fax (843) 717-3626
Ki
mberly Burgess, CPA, CGFO
Director, Administrative Services Division
kburgessr@jaspercountysc.gov
Jas
per County Council
Approval and Acceptance of Quotation
From Gordian and Johnson-Laux Construction (SC)
For 252 Russell Street Upfit
Meeting Date: April 7, 2024
Subject: Approval and acceptance of the quotation provided by Johnson-Laux Construction (SC)
with Gordian, a construction procurement provider, through a cooperative purchasing
agreement with Equalis Group, not to exceed $312,000.
Recommendation: Approve and accept the quotation provided by Johnson-Laux Construction (SC)
through Gordian and authorize the County Administrator to negotiate and execute all
necessary agreements for the project.
D
escription: Jasper County purchased the building at 252 Russell Street, Ridgeland, SC on January 8,
2025. The building requires repairs and an upfit for use by the County. The County has obtained a
quotation for the desired scope of work from Johnson-Laux Construction (SC) with Gordian, a
construction procurement provider, through a cooperative purchasing agreement with Equalis Group, not
to exceed $312,000. The project will be funded by budgeted amounts for capital expenditures in the
Capital Outlay line item #010-095-3752. A grant request in the amount of $250,000 has been submitted
to the Jasper County Legislative Delegation.
R
ecommendation: Staff recommend that the Council approve and accept the proposal submitted by
Johson-Laux Construction (SC) for repairs and upfit of 252 Russell Street, Ridgeland, SC, with funding
provided by budgeted amounts for capital expenditures in the Capital Outlay line item #010-095-375,
reduced by any grant funds received, with notice to proceed after the disposition of a grant request that
has been submitted to the Legislative Delegation is known, and to authorize the County Administrator to
execute documents necessary for this project.
A
ttachments:
Johnson-Laux Construction (SC) proposal for 252 Russell Street, Ridgeland, SC
2.00
Work Order Signature Document
EZIQC Contract No.: 2023-21-01
Russell Street Renovation
New Work Order
139155.00
Modify an Existing Work Order
Work Order Title:
Work Order Number: Work Order Date:
X
03/20/2025
Contractor Name:
Contact:
Phone:
Contact:
Phone:
John Tisdall
912-480-0580
Owner Name:
Jim Iwanicki
Johnson-Laux Construction (SC)Jasper County
Work to be Performed
Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of
EZIQC Contract No 2023-21-01.
Brief Work Order Description:
Flooring, Painting, Tree Trimming, Electrical, Stair System.
Time of Performance See Schedule Section of the Detailed Scope of Work
Will not apply:Will apply:Liquidated Damages X
Work Order Firm Fixed Price: $311,790.23
Owner Purchase Order Number:
Approvals
Date DateContractorOwner
Page 1 of 1
3/20/2025
Work Order Signature Document
Jasper County
3.00
Detailed Scope of Work
To: From: Jim Iwanicki
Jasper County
623 Live Oak Road
Ridgeland, SC 29936
John Tisdall
Johnson-Laux Construction (SC)
7001 Chatham Center Drive
Savannah, GA 31405
912-480-0580 No Data Input
Work Order Number:
March 20, 2025Date Printed:
139155.00
Russell Street RenovationWork Order Title:
Brief Scope: Flooring, Painting, Tree Trimming, Electrical, Stair System.
Revised FinalPreliminary X
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the
items set forth below shall be considered part of this scope of work.
Please see the attached scope of work at the end of this package.
Contractor Date
DateOwner
Page 1 of 1
3/20/2025
Scope of Work
Jasper County
4.00
Contractor's Price Proposal - Summary
Owner PO #:
Russell Street Renovation
139155.00
2023-21-01IQC Master Contract #:
Work Order Number:
Work Order Title:
March 20, 2025Date:
Contractor: Johnson-Laux Construction (SC)
Proposal Value:
Proposal Name:
$311,790.23
Russell Street Renovation R1
$12,086.79Alt 1 - Paint Existing Shutters
$14,595.31Alt 2 - Remove and Replace Shutters
$52,043.84Alt 3 - Generator
$7,657.67Alt 4 - Interior Ceiling Painting
$2,576.44Alt 5 - Shutter Removal
$3,469.40Base Contract - Bond
$3,099.19Base Contract - Carpentry
$19,367.21Base Contract - Electrical
$2,522.47Base Contract - Engineering
$73,968.67Base Contract - Flooring
$3,135.82Base Contract - HVAC
$2,902.79Base Contract - Landscaping
$91,784.63Base Contract - Painting
$19,830.00Base Contract - Stairs and Deck
$2,750.00Base Contract -Business License/Permits
The Percentage of NPP on this Proposal: %
$311,790.23Proposal Total
This total represents the correct total for the proposal. Any discrepancy between line totals,
sub-totals and the proposal total is due to rounding.
Page 1 of 1
3/20/2025
Contractor's Price Proposal - Summary
Jasper County
5.00
Contractor's Price Proposal - Detail
Date: March 20, 2025
Contractor:
Work Order Title:
Owner PO #:
Work Order Number:
IQC Master Contract #: 2023-21-01
139155.00
Russell Street Renovation
Johnson-Laux Construction (SC)
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Alt 1 - Paint Existing Shutters
01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible
costs as directed by Owner. Insert the appropriate quantity to adjust the base
cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees,
list each one separately and add a comment in the "note" block to identify the
Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended
warranty, expedited shipping costs, etc.). A copy of each receipt, invoice, or
proof of payment shall be submitted with the Price Proposal.
1 $190.30EA
Installation =x x 190.30
FactorUnit PriceQuantity Total
1.00 1.1000 173.00
Bond - APPROX CONTRACT AMOUNT 12,000
FIRST NEXT NEXT NEXT NEXT OVER
100,000 400,000 2,000,000 2,500,000 2,500,000 7,500,000
- - - - -
--_ RATE 0.01440 0.01440 0.00870 0.00690 0.0063 0.00563
VALUE 173 0 0 0 0 0
CALCULATION 173 _=========_ 173
# OF MONTHS 12 Equal?
BOTTOM LINE 173
01 22 23 00 0022 34' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform2 $1,583.92DAY
Installation =x x 1,583.92
FactorUnit PriceQuantity Total
426.99 1.2365 3.00
Alt 1: Articulating boom lift for shutter removal and installation
01 71 13 00 0002 Equipment Delivery, Pickup, Mobilization And Demobilization Using A Rollback
Flatbed TruckIncludes loading, tie-down of equipment, delivery of equipment,
off loading on site, rigging, dismantling, loading for return and transporting
away. For equipment such as trenchers, skid-steer loaders (bobcats), industrial
warehouse forklifts, sweepers, scissor platform lifts, telescoping and
articulating boom man lifts with up to 40' boom lengths, etc.
3 $400.30EA
Installation =x x 400.30
FactorUnit PriceQuantity Total
323.74 1.2365 1.00
Alt 1 Boom lift mob
09 01 90 52 0038 Hand Scrape Wood Surfaces, Surface Preparation4 $40.80SF
Installation =x x 40.80
FactorUnit PriceQuantity Total
0.33 1.2365 100.00
Alt 1 Shutter Painting - additional Prep
09 01 90 52 0038 0332 For Up To 100, Add5 $30.91MOD
Installation =x x 30.91
FactorUnit PriceQuantity Total
0.25 1.2365 100.00
09 01 90 52 0040 2,000 To 5,000 PSI, Pressure Wash Wood Surfaces, Surface Preparation6 $309.82SF
Installation =x x 309.82
FactorUnit PriceQuantity Total
0.29 1.2365 864.00
Alt 1 Shutter Painting 60 Shutters 4'*1.8'*60 shutters * 2 sides = 864SF
Page 1 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Alt 1 - Paint Existing Shutters
09 91 13 00 0436 1 Coat Primer, Brush Work, Paint Shutter Or Blinds, Louvered Panel7 $2,350.34SF
Installation =x x 2,350.34
FactorUnit PriceQuantity Total
2.20 1.2365 864.00
Alt 1 Shutter Painting - 0 Shutters 4'*1.8'*60 shutters * 2 sides = 864SF
09 91 13 00 0438 2 Coats Paint, Brush Work, Paint Shutter Or Blinds, Louvered Panel8 $4,230.61SF
Installation =x x 4,230.61
FactorUnit PriceQuantity Total
3.96 1.2365 864.00
Alt 1 Shutter Painting - 60 Shutters 4'*1.8'*60 shutters * 2 sides = 864SF
10 71 13 13 0011 15" x 60" Louvered Shutter, High Impact Resistant Plastic9 $2,094.38PR
Installation =x x 1,196.68
FactorUnit PriceQuantity Total
X 32.26 1.2365 30.00
Demolition x x = 897.70X 24.20 1.2365 30.00
Alt 1 Replace exterior wooden shutters with new vinyl shutters
10 71 13 13 0404 Hinge Set, Galvanized And Painted10 $534.54PR
Installation =x x 534.54
FactorUnit PriceQuantity Total
X 14.41 1.2365 30.00
Alt 1Replace exterior wooden shutters with new vinyl shutters
10 71 13 13 0405 Acorn Holdback11 $320.87PR
Installation =x x 320.87
FactorUnit PriceQuantity Total
X 8.65 1.2365 30.00
Alt 1 Replace exterior wooden shutters with new vinyl shutters
$12,086.79Subtotal for Alt 1 - Paint Existing Shutters
Alt 2 - Remove and Replace Shutters
01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible
costs as directed by Owner. Insert the appropriate quantity to adjust the base
cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees,
list each one separately and add a comment in the "note" block to identify the
Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended
warranty, expedited shipping costs, etc.). A copy of each receipt, invoice, or
proof of payment shall be submitted with the Price Proposal.
12 $229.90EA
Installation =x x 229.90
FactorUnit PriceQuantity Total
1.00 1.1000 209.00
Alt 2 Bond
* * * * * * * *
PERFORMANCE BOND CALCULATION
APPROX CONTRACT AMOUNT 14,500
FIRST NEXT NEXT NEXT NEXT OVER
100,000 400,000 2,000,000 2,500,000 2,500,000 7,500,000
- - - - -
--_ RATE 0.01440 0.01440 0.00870 0.00690 0.0063 0.00563
VALUE 209 0 0 0 0 0
CALCULATION 209 _=========_ 209
# OF MONTHS 12 Equal?
BOTTOM LINE 209
Page 2 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Alt 2 - Remove and Replace Shutters
01 22 23 00 0022 34' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform13 $1,583.92DAY
Installation =x x 1,583.92
FactorUnit PriceQuantity Total
426.99 1.2365 3.00
Alt 2 Articulating boom lift for shutter removal and installation
01 71 13 00 0002 Equipment Delivery, Pickup, Mobilization And Demobilization Using A Rollback
Flatbed TruckIncludes loading, tie-down of equipment, delivery of equipment,
off loading on site, rigging, dismantling, loading for return and transporting
away. For equipment such as trenchers, skid-steer loaders (bobcats), industrial
warehouse forklifts, sweepers, scissor platform lifts, telescoping and
articulating boom man lifts with up to 40' boom lengths, etc.
14 $400.30EA
Installation =x x 400.30
FactorUnit PriceQuantity Total
323.74 1.2365 1.00
Alt 2 Boom lift mob
10 71 13 13 0011 15" x 60" Louvered Shutter, High Impact Resistant Plastic15 $2,094.38PR
Installation =x x 1,196.68
FactorUnit PriceQuantity Total
X 32.26 1.2365 30.00
Demolition x x = 897.70X 24.20 1.2365 30.00
Alt 2 Replace exterior wooden shutters with new vinyl shutters
10 71 13 13 0011 15" x 60" Louvered Shutter, High Impact Resistant Plastic16 $4,675.45PR
Installation =x x 4,675.45
FactorUnit PriceQuantity Total
X X 126.04 1.2365 30.00
Alt 2: New Shutters Material
10 71 13 13 0011 0138 For Colored Finish, Add17 $841.69MOD
Installation =x x 841.69
FactorUnit PriceQuantity Total
22.69 1.2365 30.00
10 71 13 13 0404 Hinge Set, Galvanized And Painted18 $1,874.78PR
Installation =x x 1,874.78
FactorUnit PriceQuantity Total
X X 50.54 1.2365 30.00
Alt 2: New Shutters Material
10 71 13 13 0404 Hinge Set, Galvanized And Painted19 $534.54PR
Installation =x x 534.54
FactorUnit PriceQuantity Total
X 14.41 1.2365 30.00
Alt 2 Replace exterior wooden shutters with new vinyl shutters
10 71 13 13 0405 Acorn Holdback20 $2,039.48PR
Installation =x x 2,039.48
FactorUnit PriceQuantity Total
X X 54.98 1.2365 30.00
Alt 2: New Shutters Material
10 71 13 13 0405 Acorn Holdback21 $320.87PR
Installation =x x 320.87
FactorUnit PriceQuantity Total
X 8.65 1.2365 30.00
Alt 2 Replace exterior wooden shutters with new vinyl shutters
$14,595.31Subtotal for Alt 2 - Remove and Replace Shutters
Page 3 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Alt 3 - Generator
01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible
costs as directed by Owner. Insert the appropriate quantity to adjust the base
cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees,
list each one separately and add a comment in the "note" block to identify the
Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended
warranty, expedited shipping costs, etc.). A copy of each receipt, invoice, or
proof of payment shall be submitted with the Price Proposal.
22 $807.40EA
Installation =x x 807.40
FactorUnit PriceQuantity Total
1.00 1.1000 734.00
Alt 3 - Generator Bond
* * * * * * * *
PERFORMANCE BOND CALCULATION
APPROX CONTRACT AMOUNT 51,000
FIRST NEXT NEXT NEXT NEXT OVER
100,000 400,000 2,000,000 2,500,000 2,500,000 7,500,000
- - - - -
--_ RATE 0.01440 0.01440 0.00870 0.00690 0.0063 0.00563
VALUE 734 0 0 0 0 0
CALCULATION 734 _=========_ 734
# OF MONTHS 12 Equal?
BOTTOM LINE 734
26 05 19 16 0282 #6 AWG, Type THHN-THWN, 600 Volt, Copper, Single Stranded Cable,
Installed In Conduit
23 $175.45MLF
Installation =x x 175.45
FactorUnit PriceQuantity Total
1,418.95 1.2365 0.10
Alt 3 - Generator - Genset conductor
26 05 19 16 0285 #2 AWG, Type THHN-THWN, 600 Volt, Copper, Single Stranded Cable,
Installed In Conduit
24 $761.16MLF
Installation =x x 761.16
FactorUnit PriceQuantity Total
2,931.32 1.2365 0.21
Alt 3 - Generator - Genset conductor
26 05 29 00 0195 2", Two Hole Steel Conduit Strap25 $31.56EA
Installation =x x 31.56
FactorUnit PriceQuantity Total
3.19 1.2365 8.00
Alt 3 - Generator - Conduit for generators
26 05 33 13 1495 2" Schedule 40 Polyvinyl Chloride (PVC) Conduit With Coupled End26 $908.09LF
Installation =x x 908.09
FactorUnit PriceQuantity Total
8.16 1.2365 90.00
Alt 3 - Generator - Conduit for generators
26 05 33 13 1508 2" Schedule 40 Polyvinyl Chloride (PVC) Conduit 90 Degree ElbowSee CSI
section 26 05 33 13-2329 for conduit field bending.
27 $230.73EA
Installation =x x 230.73
FactorUnit PriceQuantity Total
31.10 1.2365 6.00
Alt 3 - Generator - Conduit for generators
Page 4 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Alt 3 - Generator
26 05 33 13 1609 2" Polyvinyl Chloride (PVC) Conduit Male Terminal Adapter28 $162.82EA
Installation =x x 162.82
FactorUnit PriceQuantity Total
16.46 1.2365 8.00
Alt 3 - Generator - Conduit for generators
26 32 13 19 0003 25 KW Natural Gas Or Propane Generator Set, 3 Phase (Cummins GGMB)29 $38,398.27EA
Installation =x x 38,398.27
FactorUnit PriceQuantity Total
15,527.00 1.2365 2.00
Alt 3 - Generator - 26 KW genset
26 36 23 00 0004 225 Amperes, Automatic Transfer Switch, 120/240 Volt, NEMA 1, 2 Pole Circuit
Breaker, Programmable, 3 Wire
30 $10,342.23EA
Installation =x x 10,342.23
FactorUnit PriceQuantity Total
4,182.06 1.2365 2.00
Alt 3 - Generator - Genset transfer switch
31 22 19 13 0004 Trim And Shape Area On Grade By Hand, Finish Grade31 $24.11SF
Installation =x x 24.11
FactorUnit PriceQuantity Total
0.39 1.2365 50.00
Alt 3 - Generator - Installation of conduit
31 23 16 13 0007 Excavation For Trenching By Hand In SoilIncludes stockpiling excess materials
and trimming sides and bottom of trench.
32 $126.96CY
Installation =x x 126.96
FactorUnit PriceQuantity Total
51.34 1.2365 2.00
Alt 3 - Generator - Installation of conduit
31 23 16 13 0013 Backfilling or Placing Subbase for Trenches with Imported or Stockpiled
Materials by Hand
33 $35.27CY
Installation =x x 35.26
FactorUnit PriceQuantity Total
14.26 1.2365 2.00
Alt 3 - Generator - Installation of conduit
31 23 16 13 0016 Compaction of Fill or Subbase for Trenches by Hand34 $39.79CY
Installation =x x 39.79
FactorUnit PriceQuantity Total
16.09 1.2365 2.00
Alt 3 - Generator - Installation of conduit
$52,043.84Subtotal for Alt 3 - Generator
Alt 4 - Interior Ceiling Painting
Page 5 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Alt 4 - Interior Ceiling Painting
01 22 16 00 0003 TaxesThe Contractor shall pay all sales, consumer, use and other similar taxes
required by Law for which an exemption does not exist. If the Contractor is
required to pay sales tax on non-exempt material, equipment, services or other
items purchased in connection with a Purchase Order, the Member will
reimburse the Contractor for such tax, without mark-up, provided the
Contractor submits the appropriate documentation therefore.
The Adjustment Factor applied to Taxes will be 1.1000. The base cost of the
Taxes is $1.00. The quantity used will adjust the base cost to the actual Taxes
(e.g. quantity of 125 = $125.00 Taxes).
35 $119.90EA
Installation =x x 119.90
FactorUnit PriceQuantity Total
1.00 1.1000 109.00
Alt -4 PERFORMANCE BOND CALCULATION
APPROX CONTRACT AMOUNT 7,550
FIRST NEXT NEXT NEXT NEXT OVER
100,000 400,000 2,000,000 2,500,000 2,500,000 7,500,000
- - - - -
--_ RATE 0.01440 0.01440 0.00870 0.00690 0.0063 0.00563
VALUE 109 0 0 0 0 0
CALCULATION 109 _=========_ 109
# OF MONTHS 12 Equal?
BOTTOM LINE 109
09 91 23 00 0158 1 Coat Primer, Brush/Roller Work, Paint Interior Drywall/Plaster Ceiling36 $2,838.30SF
Installation =x x 2,838.30
FactorUnit PriceQuantity Total
0.61 1.2365 3,763.00
Paint - Prime Interior Ceilings
09 91 23 00 0158 0282 For >2,500 To 5,000, Deduct37 -$139.59MOD
Installation =x x -139.59
FactorUnit PriceQuantity Total
-0.03 1.2365 3,763.00
09 91 23 00 0160 2 Coats Paint, Brush/Roller Work, Paint Interior Drywall/Plaster Ceiling38 $5,118.24SF
Installation =x x 5,118.24
FactorUnit PriceQuantity Total
1.10 1.2365 3,763.00
Paint - Paint interior Ceilings
09 91 23 00 0160 0282 For >2,500 To 5,000, Deduct39 -$279.18MOD
Installation =x x -279.18
FactorUnit PriceQuantity Total
-0.06 1.2365 3,763.00
$7,657.67Subtotal for Alt 4 - Interior Ceiling Painting
Alt 5 - Shutter Removal
Page 6 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Alt 5 - Shutter Removal
01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible
costs as directed by Owner. Insert the appropriate quantity to adjust the base
cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees,
list each one separately and add a comment in the "note" block to identify the
Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended
warranty, expedited shipping costs, etc.). A copy of each receipt, invoice, or
proof of payment shall be submitted with the Price Proposal.
40 $40.70EA
Installation =x x 40.70
FactorUnit PriceQuantity Total
1.00 1.1000 37.00
Alt 5- PERFORMANCE BOND CALCULATION
APPROX CONTRACT AMOUNT 2,535
FIRST NEXT NEXT NEXT NEXT OVER
100,000 400,000 2,000,000 2,500,000 2,500,000 7,500,000
- - - - -
--_ RATE 0.01440 0.01440 0.00870 0.00690 0.0063 0.00563
VALUE 37 0 0 0 0 0
CALCULATION 37 _=========_ 37
# OF MONTHS 12 Equal?
BOTTOM LINE 37
01 22 23 00 0022 34' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform41 $1,055.95DAY
Installation =x x 1,055.95
FactorUnit PriceQuantity Total
426.99 1.2365 2.00
Alt 5: Articulating boom lift for shutter Removal and Caulking
01 71 13 00 0002 Equipment Delivery, Pickup, Mobilization And Demobilization Using A Rollback
Flatbed TruckIncludes loading, tie-down of equipment, delivery of equipment,
off loading on site, rigging, dismantling, loading for return and transporting
away. For equipment such as trenchers, skid-steer loaders (bobcats), industrial
warehouse forklifts, sweepers, scissor platform lifts, telescoping and
articulating boom man lifts with up to 40' boom lengths, etc.
42 $400.30EA
Installation =x x 400.30
FactorUnit PriceQuantity Total
323.74 1.2365 1.00
Alt 5 Boom lift mob
07 92 13 00 0006 3/8" x 1/2" Joint, Silicone Sealant And Caulking43 $206.88CLF
Installation =x x 206.88
FactorUnit PriceQuantity Total
334.62 1.2365 0.50
Alt 5 - Caulking Shutters holes after demo
07 92 13 00 0006 0092 For Custom Match Coloring, Add44 $26.03MOD
Installation =x x 26.03
FactorUnit PriceQuantity Total
42.10 1.2365 0.50
07 92 13 00 0006 0101 For Up To 2 CLF, Add45 $13.06MOD
Installation =x x 13.06
FactorUnit PriceQuantity Total
21.12 1.2365 0.50
Page 7 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Alt 5 - Shutter Removal
10 71 13 13 0207 18" Thru 20" Width x 58-1/8" Thru 62" Height Cypress Fixed Louver Wood
Shutter
46 $833.52PR
Installation =x x 0.00
FactorUnit PriceQuantity Total
2,219.25 1.2365 0.00
Demolition x x = 833.52 22.47 1.2365 30.00
Alt 5 Demo of shutters
$2,576.44Subtotal for Alt 5 - Shutter Removal
Base Contract - Bond
01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible
costs as directed by Owner. Insert the appropriate quantity to adjust the base
cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees,
list each one separately and add a comment in the "note" block to identify the
Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended
warranty, expedited shipping costs, etc.). A copy of each receipt, invoice, or
proof of payment shall be submitted with the Price Proposal.
47 $3,469.40EA
Installation =x x 3,469.40
FactorUnit PriceQuantity Total
1.00 1.1000 3,154.00
PERFORMANCE BOND CALCULATION
APPROX CONTRACT AMOUNT 219,000
FIRST NEXT NEXT NEXT NEXT OVER
100,000 400,000 2,000,000 2,500,000 2,500,000 7,500,000
- - - - -
--_ RATE 0.01440 0.01440 0.00870 0.00690 0.0063 0.00563
VALUE 1,440 1,714 0 0 0 0
CALCULATION 3,154 _=========_ 3,154
# OF MONTHS 12 Equal?
BOTTOM LINE 3,154
* * * * * * * *
$3,469.40Subtotal for Base Contract - Bond
Base Contract - Carpentry
01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible
costs as directed by Owner. Insert the appropriate quantity to adjust the base
cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees,
list each one separately and add a comment in the "note" block to identify the
Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended
warranty, expedited shipping costs, etc.). A copy of each receipt, invoice, or
proof of payment shall be submitted with the Price Proposal.
48 $2,800.00EA
Installation =x x 2,800.00
FactorUnit PriceQuantity Total
1.00 1.0000 2,800.00
Carpentry- Allowance for patching drywall and re-install crown molding from IT department work ($2,000)
Ceiling tile replacement ($800.00)
Page 8 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Base Contract - Carpentry
08 71 11 00 2255 Rekey Existing Cylinder To Match Existing Cylinders Or Master Key49 $84.47EA
Installation =x x 84.47
FactorUnit PriceQuantity Total
68.31 1.2365 1.00
Carpentry - Lock Assembly
08 71 11 00 2437 Single Cylinder Deadbolt, Key One Side, Knob One SideCylindrical, ANSI
Grade 1, interchangeable core, bright brass or satin chromium finish.
50 $214.72EA
Installation =x x 197.14
FactorUnit PriceQuantity Total
159.43 1.2365 1.00
Demolition x x = 17.58 14.22 1.2365 1.00
Carpentry - Lock Assembly
$3,099.19Subtotal for Base Contract - Carpentry
Base Contract - Electrical
01 22 20 00 0010 ElectricianFor tasks not included in the Construction Task Catalog® and as
directed by owner only.
51 $704.31HR
Installation =x x 704.31
FactorUnit PriceQuantity Total
56.96 1.2365 10.00
Electrical - Used to trace connections for labeling and to investigate disconnects.
26 01 20 91 0002 Lock Out/Tag Out Local DisconnectExcludes tag or padlock See CSI section
26 01 20 91-0004 for padlock, 26 01 20 91-0005 for tag(s).
52 $103.17EA
Installation =x x 103.17
FactorUnit PriceQuantity Total
20.86 1.2365 4.00
Electrical - Lockout tagout during electrical work.
26 01 50 51 0340 4', 2,200 Lumens, 4000K CCT, LED Tube (T8 Fluorescent Lamp Replacement)
(Remphos RPT-TOTALTUBEG2HO-T8-48IN-4000K)
53 $10,318.05EA
Installation =x x 10,318.05
FactorUnit PriceQuantity Total
49.67 1.2365 168.00
Electrical - Lighting -
Upgrade 7 lay in lights to LED. 4 per fixture = 28 Lamps
Upgrade 36 Surface Mounted to LED 4 per fixture = 144 Lamps
26 01 50 51 0340 0024 For Removal Of Multiple Lamps In A Fixture, Deduct54 -$91.98MOD
Installation =x x -91.98
FactorUnit PriceQuantity Total
-1.73 1.2365 43.00
26 01 50 51 0386 Recycle Compact Fluorescent Lamps55 $938.95EA
Installation =x x 938.95
FactorUnit PriceQuantity Total
4.52 1.2365 168.00
Electrical - Recycle existing lamps
26 01 50 52 0061 4 Lamp, 25 Watt, Instant Start, T8 Fluorescent Electronic Ballast56 $1,083.59EA
Installation =x x 1,083.59
FactorUnit PriceQuantity Total
X 20.38 1.2365 43.00
Electrical - Used to disconnect and rewire around existing ballast for light
Page 9 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Base Contract - Electrical
26 01 50 53 0006 Removal And Replacement Of 1' x 4' Diffuser With 0.125" Thick Prismatic
Acrylic Diffuser
57 $515.47EA
Installation =x x 515.47
FactorUnit PriceQuantity Total
X 11.58 1.2365 36.00
Electrical - Removal and Reinstall Lens to access bulbs (36 fixtures) - Material excluded
26 01 50 53 0008 Removal And Replacement Of 2' x 4' Diffuser With 0.125" Thick Prismatic
Acrylic Diffuser
58 $100.23EA
Installation =x x 100.23
FactorUnit PriceQuantity Total
X 11.58 1.2365 7.00
Electrical - Removal and Reinstall Lens to access bulbs (7 Laying fixtures) - Material excluded
26 05 19 16 0279 #12 AWG, Type THHN-THWN, 600 Volt, Copper, Single Stranded Cable,
Installed In Conduit
59 $631.04MLF
Installation =x x 631.04
FactorUnit PriceQuantity Total
510.34 1.2365 1.00
Electrical - Power wire for lighting
26 05 19 16 0280 #10 AWG, Type THHN-THWN, 600 Volt, Copper, Single Stranded Cable,
Installed In Conduit
60 $408.39MLF
Installation =x x 408.39
FactorUnit PriceQuantity Total
660.55 1.2365 0.50
Electrical - Ground Wire for Lighting
26 05 33 13 0602 3/4" Electrical Metallic Tubing (EMT) Conduit61 $954.58LF
Installation =x x 954.58
FactorUnit PriceQuantity Total
3.86 1.2365 200.00
Electrical - Conduit assembly
26 05 33 13 0613 3/4" Electrical Metallic Tubing (EMT) 90 Degree Elbow62 $82.20EA
Installation =x x 82.20
FactorUnit PriceQuantity Total
8.31 1.2365 8.00
Electrical - Conduit assembly
26 05 33 13 0712 3/4" Electrical Metallic Tubing (EMT) Insulated Straight Box Compression
Connector
63 $57.25EA
Installation =x x 57.25
FactorUnit PriceQuantity Total
4.63 1.2365 10.00
Electrical - Conduit assembly
26 05 33 13 2399 3/4" Flexible Metallic Conduit64 $0.00LF
Installation =x x 0.00
FactorUnit PriceQuantity Total
2.88 1.2365 0.00
Electrical - Conduit assembly
26 05 33 16 0038 3-1/4" Depth, 4-11/16" Square Steel Box65 $176.13EA
Installation =x x 176.13
FactorUnit PriceQuantity Total
35.61 1.2365 4.00
Electrical - Conduit assembly
26 05 33 16 0063 Flat, 4-11/16" Square Steel Exposed Work Cover66 $18.25EA
Installation =x x 18.25
FactorUnit PriceQuantity Total
7.38 1.2365 2.00
Electrical - Electrical - Conduit assembly
Page 10 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Base Contract - Electrical
26 05 53 00 0019 Labeling Existing Wire67 $108.61EA
Installation =x x 108.61
FactorUnit PriceQuantity Total
1.83 1.2365 48.00
Electrical - Labeling of Panels
26 51 19 00 0269 2-1/2" Diameter x 15-1/2" High, Polished Nickel, LED Wall Sconce (Hudson
Valley Lighting SHAW 1200-PN)
68 $28.55EA
Installation =x x 0.00
FactorUnit PriceQuantity Total
497.39 1.2365 0.00
Demolition x x = 28.55 23.09 1.2365 1.00
Electrical - Removal of exterior Sconce for new light for new motion light.
26 52 13 13 0009 72 Max Wattage At 90 Minutes, 12 Volt, Remote Capability, Polycarbonate
Housing, Krypton Lamps, Commercial Emergency Light (Lithonia ELM1272)
69 $1,918.68EA
Installation =x x 1,918.68
FactorUnit PriceQuantity Total
775.85 1.2365 2.00
Electrical - EM lights for washrooms
26 56 19 00 0005 30 LEDs, 35 Watt, 350 mA Drive Current, Full Cutoff, LED Wall Pack (Lithonia
CSXW LED)
70 $1,177.44EA
Installation =x x 1,177.44
FactorUnit PriceQuantity Total
952.24 1.2365 1.00
Electrical - New Motion Light at the top of the back exterior stairs.
26 56 19 00 0029 Photocell For Wall Pack71 $134.30EA
Installation =x x 134.30
FactorUnit PriceQuantity Total
108.61 1.2365 1.00
Electrical - Photo Cell for Wall Pack Light
$19,367.21Subtotal for Base Contract - Electrical
Base Contract - Engineering
01 22 20 00 0057 Principal Engineer72 $506.97HR
Installation =x x 506.97
FactorUnit PriceQuantity Total
205.00 1.2365 2.00
Principal Engineering for Stairs for Permit/Inspection/Code
01 22 20 00 0059 Engineer73 $1,323.06HR
Installation =x x 1,323.06
FactorUnit PriceQuantity Total
133.75 1.2365 8.00
Engineering for Stairs for Permit/Inspection/Code
01 22 20 00 0060 Draft Person74 $692.44HR
Installation =x x 692.44
FactorUnit PriceQuantity Total
70.00 1.2365 8.00
Drafting for Stairs for Permit/Inspection/Code
$2,522.47Subtotal for Base Contract - Engineering
Base Contract - Flooring
Page 11 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Base Contract - Flooring
01 95 08 00 0073 Residential Wood Threshold75 $62.02EA
Installation =x x 55.88
FactorUnit PriceQuantity Total
45.19 1.2365 1.00
Demolition x x = 6.15 4.97 1.2365 1.00
Flooring - Wood Threshold
06 42 16 00 0005 1/4" Unfinished Birch Plywood, Natural Faced With Trim76 $8,533.61SF
Installation =x x 8,533.61
FactorUnit PriceQuantity Total
3.26 1.2365 2,117.00
Flooring - Subfloor for 2nd Floor
06 42 16 00 0005 0064 For Waterproof Glue, Add77 $209.41MOD
Installation =x x 209.41
FactorUnit PriceQuantity Total
0.08 1.2365 2,117.00
06 42 16 00 0005 0070 For 1/2" Thick Paneling, Add78 $2,329.73MOD
Installation =x x 2,329.73
FactorUnit PriceQuantity Total
0.89 1.2365 2,117.00
06 46 19 00 0002 1/2" x 1/2" Pine Quarter Round Trim79 $5,096.36LF
Installation =x x 4,028.02
FactorUnit PriceQuantity Total
3.20 1.2365 1,018.00
Demolition x x = 1,068.34 1.08 1.2365 800.00
Flooring Replace Quarter Round Trim
06 46 19 00 0002 0053 For Curved Surfaces With A 2'-0" Maximum Radius, Add80 $0.00MOD
Installation =x x 0.00
FactorUnit PriceQuantity Total
0.55 1.2365 0.00
07 13 53 00 0020 6 Mil Polyethylene Vapor Barrier81 $463.43CSF
Installation =x x 463.43
FactorUnit PriceQuantity Total
24.18 1.2365 15.50
Flooring - Vapor Barrier on First floor Concrete under LVT
07 13 53 00 0020 0018 For Joint Taping, Add82 $90.85MOD
Installation =x x 90.85
FactorUnit PriceQuantity Total
4.74 1.2365 15.50
09 65 13 23 0020 1/4" Thick, 9" To 12-1/2" Deep, Ribbed Vinyl Stair Tread83 $1,679.51LF
Installation =x x 1,679.51
FactorUnit PriceQuantity Total
21.56 1.2365 63.00
Flooring - Interior Stair Treads 18 Steps * 3.5 = 63LF (Ground to 2nd Floor only)
09 65 13 33 0003 1/4" Thick, Flexible Self Leveling Cementitious Underlayment With Liquid Latex
Modifiers
84 $3,190.17SF
Installation =x x 3,190.17
FactorUnit PriceQuantity Total
2.15 1.2365 1,200.00
Flooring - Floor Prep - 33 percent
Page 12 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Base Contract - Flooring
09 65 13 33 0005 Removal Of Glue From Concrete FloorFor removal of glue from VCT or carpet
placement. Not to be used in conjunction with demolition tasks associated with
floor tile installation.
85 $1,359.89SF
Installation =x x 1,359.89
FactorUnit PriceQuantity Total
0.71 1.2365 1,549.00
Flooring - Prep- 1st floor
09 65 13 36 0002 Vinyl Transition Strip, Brown Or Black86 $263.08LF
Installation =x x 263.08
FactorUnit PriceQuantity Total
1.97 1.2365 108.00
Flooring Transition Strips
09 65 23 00 0004 0.16" Overall Thickness, 0.020" Wear Layer, Vinyl Plank Flooring (Armstrong®
Luxe Plank™)
87 $52,310.92SF
Installation =x x 52,310.92
FactorUnit PriceQuantity Total
11.54 1.2365 3,666.00
Flooring
09 65 23 00 0004 0138 For >1,000, Deduct88 -$4,850.32MOD
Installation =x x -4,850.32
FactorUnit PriceQuantity Total
-1.07 1.2365 3,666.00
09 68 16 00 0004 7/16" Thick, Prime Polyurethane Foam Carpet Padding89 $702.76SY
Installation =x x 0.00
FactorUnit PriceQuantity Total
15.58 1.2365 0.00
Demolition x x = 702.76 1.35 1.2365 421.00
Flooring - Carpet Assembly Removal
09 68 16 00 0044 45 Ounce, Medium Traffic, Residential, Nylon Broadloom Carpet90 $2,061.44SY
Installation =x x 0.00
FactorUnit PriceQuantity Total
49.70 1.2365 0.00
Demolition x x = 2,061.44 3.96 1.2365 421.00
Flooring - Carpet Assembly Removal
09 68 16 00 0074 Metal Carpet Saddle Strip, Up To 4" Wide91 $465.81LF
Installation =x x 0.00
FactorUnit PriceQuantity Total
6.71 1.2365 0.00
Demolition x x = 465.81 0.34 1.2365 1,108.00
Flooring - Carpet Assembly Removal
$73,968.67Subtotal for Base Contract - Flooring
Base Contract - HVAC
01 22 20 00 0004 BoilermakerFor tasks not included in the Construction Task Catalog® and as
directed by owner only.
92 $347.51HR
Installation =x x 347.51
FactorUnit PriceQuantity Total
70.26 1.2365 4.00
Inspection of existing Hvac Units
Page 13 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Base Contract - HVAC
01 74 23 00 0023 Cleaning Of Ductwork Vent Opening93 $289.34EA
Installation =x x 289.34
FactorUnit PriceQuantity Total
4.50 1.2365 52.00
HVAC Cleaning - interior Vents
22 11 19 00 0215 Dryer Vent Kit With Hood, 4" x 5' Flexible Vent And Clamps94 $158.20EA
Installation =x x 137.77
FactorUnit PriceQuantity Total
55.71 1.2365 2.00
Demolition x x = 20.43 8.26 1.2365 2.00
HVAC - Dryer Vent Replacement
23 01 30 51 0002 Up To 2 SF Cross Section, Clean Supply/Return DuctworkIncludes sealing
registers, grilles, diffusers as required. Excludes cleaning of registers, grilles,
diffusers, or other devices.
95 $1,406.52LF
Installation =x x 1,406.52
FactorUnit PriceQuantity Total
1.82 1.2365 625.00
HVAC Cleaning - interior Vents
23 01 30 51 0012 Clean Grille/Diffuser/RegisterIncludes removal and reinstallation.96 $934.25EA
Installation =x x 934.25
FactorUnit PriceQuantity Total
14.53 1.2365 52.00
HVAC Cleaning - interior Vents
$3,135.82Subtotal for Base Contract - HVAC
Base Contract - Landscaping
01 22 23 00 0106 29' To 33' Bucket Truck With Full-Time Operator97 $1,539.39DAY
Installation =x x 1,539.39
FactorUnit PriceQuantity Total
1,244.96 1.2365 1.00
Tree Trimming and gutter cleaning Lift
01 22 23 00 1439 6 CY Rear Dump Truck With Full-Time Truck Driver98 $676.54DAY
Installation =x x 676.54
FactorUnit PriceQuantity Total
1,094.29 1.2365 0.50
Tree Trimming - Haul away trimmings.
07 71 23 00 0343 Cleanout Roof Gutters And Downspouts99 $87.05LF
Installation =x x 87.05
FactorUnit PriceQuantity Total
0.88 1.2365 80.00
Tree Trimming - Gutter Cleaning
32 01 90 23 0089 30" Caliper, Tree Pruning (Crown Reduction), Aerial Lift Equipment100 $599.81EA
Installation =x x 599.81
FactorUnit PriceQuantity Total
485.09 1.2365 1.00
Tree Trimming
$2,902.79Subtotal for Base Contract - Landscaping
Base Contract - Painting
Page 14 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Base Contract - Painting
01 22 23 00 0023 34' Engine Powered, Articulating (Up/Over) Boom Man Lift With Platform101 $3,974.21WK
Installation =x x 3,974.21
FactorUnit PriceQuantity Total
1,071.36 1.2365 3.00
Painting/Caulking - Lift of Exterior Painting
01 54 23 00 0048 5/16" CD Grade Plywood, Temporary Lumber102 $1,414.56SF
Installation =x x 1,414.56
FactorUnit PriceQuantity Total
1.43 1.2365 800.00
Painting - Used for ground protection for lift
01 56 16 00 0002 6 Mil, Plastic Sheeting, Applied To FloorsIncludes removal after use.103 $741.90SF
Installation =x x 741.90
FactorUnit PriceQuantity Total
0.20 1.2365 3,000.00
Painting - Used for painting protection for floors and exterior vegetation.
01 71 13 00 0002 Equipment Delivery, Pickup, Mobilization And Demobilization Using A Rollback
Flatbed TruckIncludes loading, tie-down of equipment, delivery of equipment,
off loading on site, rigging, dismantling, loading for return and transporting
away. For equipment such as trenchers, skid-steer loaders (bobcats), industrial
warehouse forklifts, sweepers, scissor platform lifts, telescoping and
articulating boom man lifts with up to 40' boom lengths, etc.
104 $400.30EA
Installation =x x 400.30
FactorUnit PriceQuantity Total
323.74 1.2365 1.00
Painting/caulking - Lift of Exterior Painting Mobilization
07 92 13 00 0004 1/4" x 1/2" Joint, Silicone Sealant And Caulking105 $1,024.42CLF
Installation =x x 1,024.42
FactorUnit PriceQuantity Total
276.16 1.2365 3.00
Caulking- Exterior - Caulking of Vertical Joints
07 92 13 00 0004 0097 For Up To 3 CLF, Add106 $62.06MOD
Installation =x x 62.06
FactorUnit PriceQuantity Total
16.73 1.2365 3.00
07 92 13 00 0009 1/2" x 1/2" Joint, Silicone Sealant And Caulking107 $986.16CLF
Installation =x x 986.16
FactorUnit PriceQuantity Total
398.77 1.2365 2.00
Caulking- Exterior - Caulking of Vertical Joints
07 92 13 00 0009 0092 For Custom Match Coloring, Add108 $138.81MOD
Installation =x x 138.81
FactorUnit PriceQuantity Total
56.13 1.2365 2.00
07 92 13 00 0016 1" x 1" Joint, Silicone Sealant And Caulking109 $287.59CLF
Installation =x x 287.59
FactorUnit PriceQuantity Total
1,162.93 1.2365 0.20
Caulking - Exterior open penetrations
09 01 90 52 0033 Chemical Alkaline Cleaner, Brush And Wash Tile Surfaces, Surface
Preparation
110 $1,869.98CSF
Installation =x x 1,869.98
FactorUnit PriceQuantity Total
23.63 1.2365 64.00
Painting Exterior - Prep with Alkaline Cleaner
Page 15 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Base Contract - Painting
09 01 90 52 0033 0332 For Up To 100, Add111 $1,380.92MOD
Installation =x x 1,380.92
FactorUnit PriceQuantity Total
17.45 1.2365 64.00
09 01 90 52 0034 2,000 To 5,000 PSI, Pressure Wash Tile Surfaces, Surface Preparation112 $1,496.30SF
Installation =x x 1,496.30
FactorUnit PriceQuantity Total
0.19 1.2365 6,369.00
Painting Exterior - Power Washing includes Rafters
4500 (Walls)+1419 ( Rafter Tails) + 280 Supports +170 Porch Ceilings
09 01 90 52 0034 0335 For >5,000 To 10,000, Deduct113 -$78.75MOD
Installation =x x -78.75
FactorUnit PriceQuantity Total
-0.01 1.2365 6,369.00
09 91 13 00 0091 1 Coat Primer, Brush Work, Paint Exterior Stucco Wall Surfaces114 $5,564.25SF
Installation =x x 5,564.25
FactorUnit PriceQuantity Total
1.00 1.2365 4,500.00
Painting Exterior - Prime Walls
09 91 13 00 0091 0194 For Work >15' To 20' Above Floor, AddApplied only to work area above 15' to
20'.
115 $173.11MOD
Installation =x x 173.11
FactorUnit PriceQuantity Total
0.10 1.2365 1,400.00
09 91 13 00 0091 0204 For >2,500 To 5,000, Deduct116 -$278.21MOD
Installation =x x -278.21
FactorUnit PriceQuantity Total
-0.05 1.2365 4,500.00
09 91 13 00 0093 2 Coats Paint, Brush Work, Paint Exterior Stucco Wall Surfaces117 $11,684.93SF
Installation =x x 11,684.93
FactorUnit PriceQuantity Total
2.10 1.2365 4,500.00
Painting Exterior - Paint Walls
09 91 13 00 0093 0194 For Work >15' To 20' Above Floor, AddApplied only to work area above 15' to
20'.
118 $346.22MOD
Installation =x x 346.22
FactorUnit PriceQuantity Total
0.20 1.2365 1,400.00
09 91 13 00 0093 0204 For >2,500 To 5,000, Deduct119 -$612.07MOD
Installation =x x -612.07
FactorUnit PriceQuantity Total
-0.11 1.2365 4,500.00
09 91 13 00 0103 1 Coat Primer, Brush Work, Paint Exterior Wood Smooth Siding120 $123.77SF
Installation =x x 123.77
FactorUnit PriceQuantity Total
0.91 1.2365 110.00
Painting Exterior - Prime Front Porch Columns
09 91 13 00 0103 0202 For >100 To 250, Add121 $31.28MOD
Installation =x x 31.28
FactorUnit PriceQuantity Total
0.23 1.2365 110.00
Page 16 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Base Contract - Painting
09 91 13 00 0105 2 Coats Paint, Brush Work, Paint Exterior Wood Smooth Siding122 $228.51SF
Installation =x x 228.51
FactorUnit PriceQuantity Total
1.68 1.2365 110.00
Painting Exterior - Paint Front Porch Columns
09 91 13 00 0105 0202 For >100 To 250, Add123 $58.49MOD
Installation =x x 58.49
FactorUnit PriceQuantity Total
0.43 1.2365 110.00
09 91 13 00 0173 1 Coat Primer, Brush/Roller Work, Paint Exterior Rough Wood Ceiling124 $275.37SF
Installation =x x 275.37
FactorUnit PriceQuantity Total
1.31 1.2365 170.00
Painting Exterior -
Prime Porch Ceiling
09 91 13 00 0173 0202 For >100 To 250, Add125 $60.96MOD
Installation =x x 60.96
FactorUnit PriceQuantity Total
0.29 1.2365 170.00
09 91 13 00 0175 2 Coats Paint, Brush/Roller Work, Paint Exterior Rough Wood Ceiling126 $536.02SF
Installation =x x 536.02
FactorUnit PriceQuantity Total
2.55 1.2365 170.00
Painting Exterior -
Paint Porch Ceiling
09 91 13 00 0175 0202 For >100 To 250, Add127 $115.61MOD
Installation =x x 115.61
FactorUnit PriceQuantity Total
0.55 1.2365 170.00
09 91 13 00 0263 1 Coat Primer, Brush/Roller Work, Paint Exterior Wood DoorBoth faces128 $382.47EA
Installation =x x 382.47
FactorUnit PriceQuantity Total
77.33 1.2365 4.00
Paint - Prime Exterior Doors
09 91 13 00 0265 2 Coats Paint, Brush Roller Work, Paint Exterior Wood DoorBoth faces129 $715.93EA
Installation =x x 715.93
FactorUnit PriceQuantity Total
144.75 1.2365 4.00
Paint - Paint Exterior Doors
09 91 13 00 0366 1 Coat Alkyd Primer, Brush/Roller Work, 1 Rail, Paint Hand Rail And Bracket130 $142.44LF
Installation =x x 142.44
FactorUnit PriceQuantity Total
0.96 1.2365 120.00
Paint Exterior and Interior - Prime Hand Rail
09 91 13 00 0368 2 Coats Alkyd Enamel Paint, Brush/Roller Work, 1 Rail, Paint Hand Rail And
Bracket
131 $244.83LF
Installation =x x 244.83
FactorUnit PriceQuantity Total
1.65 1.2365 120.00
Paint Exterior - Paint Hand Rail
Page 17 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Base Contract - Painting
09 91 13 00 0467 1 Coat Non-Slip Paint, Brush/Roller Work, Paint Exterior Wood Stair (To 4'
Wide)
132 $1,180.96RSR
Installation =x x 1,180.96
FactorUnit PriceQuantity Total
11.37 1.2365 84.00
Painting- Stain Both Sides of Exterior Stairs *2. Non Slip Finish
09 91 13 00 0483 1 Coat Primer, Brush Work, Paint Exterior Wood Trim133 $965.46SF
Installation =x x 965.46
FactorUnit PriceQuantity Total
1.22 1.2365 640.00
Paint Exterior - Prime Wood Trim at windows and doors
09 91 13 00 0485 2 Coats Paint, Brush Work, Paint Exterior Wood Trim134 $1,954.66SF
Installation =x x 1,954.66
FactorUnit PriceQuantity Total
2.47 1.2365 640.00
Paint Exterior - Paint Wood Trim at windows and doors
09 91 13 00 0487 1 Coat Paint, Brush/Roller Work, Paint Exterior Wood Trim135 $2,415.94SF
Installation =x x 2,415.94
FactorUnit PriceQuantity Total
1.15 1.2365 1,699.00
Paint Exterior - Prime Rafter Tails (1419) and Supports (280)
09 91 13 00 0488 2 Coats Paint, Brush/Roller Work, Paint Exterior Wood Trim136 $4,558.77SF
Installation =x x 4,558.77
FactorUnit PriceQuantity Total
2.17 1.2365 1,699.00
Paint Exterior - Paint Rafter Tails (1419) and Supports (280)
09 91 23 00 0065 1 Coat Primer, Brush/Roller Work, Paint Interior Plaster/Drywall Walls137 $12,108.92SF
Installation =x x 12,108.92
FactorUnit PriceQuantity Total
0.54 1.2365 18,135.00
Paint - Prime Interior Walls
09 91 23 00 0065 0284 For >10,000 To 20,000, Deduct138 -$1,793.91MOD
Installation =x x -1,793.91
FactorUnit PriceQuantity Total
-0.08 1.2365 18,135.00
09 91 23 00 0067 2 Coats Paint, Brush/Roller Work, Paint Interior Plaster/Drywall Walls139 $23,769.36SF
Installation =x x 23,769.36
FactorUnit PriceQuantity Total
1.06 1.2365 18,135.00
Paint - Paint Interior Walls
09 91 23 00 0067 0284 For >10,000 To 20,000, Deduct140 -$3,587.83MOD
Installation =x x -3,587.83
FactorUnit PriceQuantity Total
-0.16 1.2365 18,135.00
09 91 23 00 0247 1 Coat Primer, Brush/Roller Work, Paint Interior Wood Door Frame And Trim141 $2,707.01LF
Installation =x x 2,707.01
FactorUnit PriceQuantity Total
0.75 1.2365 2,919.00
Paint - Prime Door Frame, Trim and Molding
Page 18 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Base Contract - Painting
09 91 23 00 0249 2 Coats Paint, Brush/Roller Work, Paint Interior Wood Door Frame And Trim142 $5,702.76LF
Installation =x x 5,702.76
FactorUnit PriceQuantity Total
1.58 1.2365 2,919.00
Paint - Prime Door Frame, Trim and Molding
09 91 23 00 0270 1 Coat Primer, Brush/Roller Work, Both Faces, Paint Interior Wood Door143 $2,841.38EA
Installation =x x 2,841.38
FactorUnit PriceQuantity Total
71.81 1.2365 32.00
Paint - Prime interior Doors
09 91 23 00 0270 0298 For >25, Deduct144 -$426.15MOD
Installation =x x -426.15
FactorUnit PriceQuantity Total
-10.77 1.2365 32.00
09 91 23 00 0272 2 Coats Paint, Brush/Roller Work, Both Faces, Paint Interior Wood Door145 $5,247.11EA
Installation =x x 5,247.11
FactorUnit PriceQuantity Total
132.61 1.2365 32.00
Paint - Paint interior Doors
09 91 23 00 0272 0298 For >25, Deduct146 -$787.01MOD
Installation =x x -787.01
FactorUnit PriceQuantity Total
-19.89 1.2365 32.00
09 91 33 00 0071 Redwood Oil Stain, 300 SF Per Gallon147 $340.41GAL
Installation =x x 340.41
FactorUnit PriceQuantity Total
55.06 1.2365 5.00
Painting - Used for Supercoat Stain - Oil based
09 93 23 13 0002 Stain Wood Trim, Up To 6" Wide, 1 Coat Stain, With Brush And Wipe Off148 $664.74LF
Installation =x x 664.74
FactorUnit PriceQuantity Total
0.70 1.2365 768.00
Painting - Staining 384 LF of surface (posts, trim and blocking) * 2 = 768
09 93 23 13 0003 Stain Wood Trim, 1 Coat Stain, With Brush And Wipe Off149 $327.67SF
Installation =x x 327.67
FactorUnit PriceQuantity Total
1.06 1.2365 250.00
Painting- Stain Exterior Stair Decks and facia
09 93 23 13 0003 0319 For >100 To 250, Add150 $102.01MOD
Installation =x x 102.01
FactorUnit PriceQuantity Total
0.33 1.2365 250.00
$91,784.63Subtotal for Base Contract - Painting
Base Contract - Stairs and Deck
01 22 23 00 1049 10,000 Lb. Capacity, Telescopic Boom, Hi-Reach, Rough Terrain Construction
Forklift With Full-Time Operator
151 $5,130.21WK
Installation =x x 5,130.21
FactorUnit PriceQuantity Total
4,148.98 1.2365 1.00
Stairs/Deck - telescopic boom forklift for deck installation
Page 19 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Base Contract - Stairs and Deck
01 54 23 00 0013 Heavy-Duty Masonry Scaffolding With Bracing Accessories - Area Based On 4'
Wide Sections (CCF / Month)
152 $1,035.84CCF
Installation =x x 1,035.84
FactorUnit PriceQuantity Total
69.81 1.2365 12.00
Stairs/Deck - Scaffold for deck demolition and installation
01 54 23 00 0019 Up To 20' Height Heavy-Duty Masonry Scaffolding Initial Erection And Final
Dismantling, Per CCF Of Scaffolding And Accessories.
153 $590.26CCF
Installation =x x 590.26
FactorUnit PriceQuantity Total
39.78 1.2365 12.00
Stairs/Deck - Scaffold for deck demolition and installation
01 71 13 00 0003 Equipment Delivery, Pickup, Mobilization And Demobilization Using A Tractor
Trailer With Up To 53' BedIncludes loading, tie-down of equipment, delivery of
equipment, off loading on site, rigging, dismantling, loading for return and
transporting away. For equipment such as bulldozers, motor scrapers,
hydraulic excavators, gradalls, road graders, loader-backhoes, heavy-duty
construction loaders, tractors, pavers, rollers, bridge finishers, straight mast
construction forklifts, telescoping boom rough terrain construction forklifts,
telescoping and articulating boom man lifts with >40' boom lengths, etc.
154 $1,579.64EA
Installation =x x 1,579.64
FactorUnit PriceQuantity Total
1,277.51 1.2365 1.00
Stairs/Deck - Hi reach forklift mob
01 74 19 00 0014 20 CY Dumpster (3 Ton) "Construction Debris"Includes delivery of dumpster,
rental cost, pick-up cost, hauling, and disposal fee. Non-hazardous material.
155 $673.89EA
Installation =x x 673.89
FactorUnit PriceQuantity Total
545.00 1.2365 1.00
Stairs/Deck - Pressure treated wood deck demo and construction debris hauled off site
02 41 16 13 0020 By Pneumatic Tools/Hand, Wood Frame Construction Building Demolition156 $1,454.56CCF
Installation =x x 1,454.56
FactorUnit PriceQuantity Total
33.61 1.2365 35.00
Stairs/Deck - Demo
02 41 16 13 0020 0004 For Up To 500, Add157 $436.24MOD
Installation =x x 436.24
FactorUnit PriceQuantity Total
10.08 1.2365 35.00
02 41 16 13 0020 0010 For Volume Of Area Within 15' To An Adjacent Building, Add158 $479.95MOD
Installation =x x 479.95
FactorUnit PriceQuantity Total
11.09 1.2365 35.00
06 11 16 00 0105 6" x 6" Pressure Treated Wood Post159 $712.97LF
Installation =x x 712.97
FactorUnit PriceQuantity Total
9.61 1.2365 60.00
Stairs/Deck - Ground posts
06 11 16 00 0135 2" x 8" Pressure Treated Wood Blocking To Wood160 $111.58LF
Installation =x x 111.58
FactorUnit PriceQuantity Total
5.64 1.2365 16.00
Stairs/Deck - Ledger board
Page 20 of 21
3/20/2025
Contractor's Price Proposal - Detail
Jasper County
Contractor's Price Proposal - Detail Continues..
Work Order Title:
Work Order Number: 139155.00
Russell Street Renovation
Proposal Name:
$311,790.23
Russell Street Renovation R1
Proposal Value:
Labor
Sect. Item Modifer UOM Description Line Total
MaterialEquip. (Excluded if marked with an X)
Base Contract - Stairs and Deck
06 15 13 00 0011 2" x 4" Pressure Treated Decking, 2" x 10" Pressure Treated Joists 16" On
Center, Wood Deck System
161 $2,058.33SF
Installation =x x 2,058.33
FactorUnit PriceQuantity Total
23.12 1.2365 72.00
Stairs/Deck - Stair deck assembly
06 15 13 00 0140 3'-6" Wide, 2" x 4" Pressure Treated Decking With 2" x 10" Pressure Treated
Joists, Wood Stair System
162 $1,964.11RSR
Installation =x x 1,964.11
FactorUnit PriceQuantity Total
75.64 1.2365 21.00
Stairs/Deck - Stair assembly
06 43 16 00 0008 2-1/2" Diameter, Wood Handrail With Brackets163 $3,017.31LF
Installation =x x 3,017.31
FactorUnit PriceQuantity Total
40.67 1.2365 60.00
Stairs/Deck - ADA railing on new stairs/deck assembly
07 46 46 00 0002 5-1/4" Board with 4" Exposure, 5/16" Thick, Fiber Cement Lap Siding164 $298.44SF
Installation =x x 298.44
FactorUnit PriceQuantity Total
4.31 1.2365 56.00
Stairs/Deck - Cement siding fascia board at new deck
07 46 46 00 0015 4" Wide, 7/16" Thick, Fiber Cement Trim Board165 $286.67LF
Installation =x x 286.67
FactorUnit PriceQuantity Total
2.07 1.2365 112.00
Stairs/Deck - Cement siding repairs at new deck
$19,830.00Subtotal for Base Contract - Stairs and Deck
Base Contract -Business License/Permits
01 22 16 00 0002 Reimbursable FeesReimbursable Fees will be paid to the contractor for eligible
costs as directed by Owner. Insert the appropriate quantity to adjust the base
cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees,
list each one separately and add a comment in the "note" block to identify the
Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended
warranty, expedited shipping costs, etc.). A copy of each receipt, invoice, or
proof of payment shall be submitted with the Price Proposal.
166 $2,750.00EA
Installation =x x 2,750.00
FactorUnit PriceQuantity Total
1.00 1.1000 2,500.00
Business License/Permit
$2,750.00Subtotal for Base Contract -Business License/Permits
The Percentage of NPP on this Proposal: %
$311,790.23
This total represents the correct total for the proposal. Any discrepancy between line totals,
sub-totals and the proposal total is due to rounding.
Proposal Total
Page 21 of 21
3/20/2025
Subcontractor Listing
Jasper County
Client - Jasper County
Detailed Scope of Work
March 20, 2025
Russell Street Renovation
139155.00Work Order Number:
Work Order Title:
Print Date:
Contractor: 2023-21-01 - Johnson-Laux Construction (SC)
Brief Scope: Flooring, Painting, Tree Trimming, Electrical, Stair System.
To: From:John Tisdall
Johnson-Laux Construction (SC)
7001 Chatham Center Drive
Savannah, GA 31405
Jim Iwanicki
Jasper County
623 Live Oak Road
Ridgeland, SC 29936
912-480-0580 No Data Input
The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the
items set forth below shall be considered part of this scope of work.
Please see the attached scope of work at the end of this package.
Detailed Scope:
Owner Date
Contractor Date
Page 1 of 1Detailed Scope of Work
3/20/2025Jasper County
SCOPE OF WORK
Russell Street Reno
252 Russell Street
Ridgeland, SC
[1]
Building March 19, 2025
Summary Scope
The project consists of specific activities associated with Renovation of the new IT Building on Russell
Street.
Detailed Scope of Work
The Contractor shall provide all materials, labor, and equipment and perform all work as described in the
scope of work below:
Engineering & Design
▪ Contractor to perform the following for the desired access stairs on the backside of the Russell
Street building:
o Provide engineer stamped drawings for exterior stair assembly
Site
▪ Contractor to provide labor and materials to
o Remove and dispose of debris from gutter on east side by tree.
o Trim tree on east side of building
Wood
▪ Contractor to provide labor and materials to
o Remove and replace exterior fire escape stair treads, risers, railing, landing & stringers
utilizing pressure treated lumber.
o Install Wood Handrail to meet ADA Code
o Contractor assumes stairs to be direct replacement of existing.
Openings
▪ Contractor to provide labor and materials to remove the existing Deadbolt on the 2nd floor exit
door to fire escape and replace with thumb turn Deadbolt to meet fire code.
o Lock to match existing exterior door locks.
Finishes
▪ Contractor to provide labor and materials to
o Remove and dispose of all existing carpet including the stairway (Ground to 2nd floor
stairwell)
o Apply (1) coat primer and (2) coats finish paint to all walls. (eggshell)
SCOPE OF WORK
Russell Street Reno
252 Russell Street
Ridgeland, SC
[2]
o Apply (1) coat finish paint to doors and trim. (semi-gloss)
o Apply (1) coat primer and (2) coats finish paint to fire escape/exterior stairs, railing and
supports. (super deck)
o Apply (2) coats finish paint to ADA pipe railing at exterior stairs.
o Caulk around exterior penetrations, Pressure wash and paint exterior of building siding &
trim with (2) coats Exterior finish paint.
o Provide and install new LVT flooring throughout the building, including the stairwell as a
direct replacement for all carpeted areas.
o Provide new flooring to include the following:
▪ LVT plank flooring floating or glue down.
▪ Moisture barrier/underlayment for floating floors.
▪ Vinyl transitions to each room.
▪ Vinyl riser and LVT tread on stairs.
▪ Quarter round trim at all base boards.
HVAC
▪ Contractor to provide labor and materials to
o Furnish and install (2) Plastic dryer vent covers at exterior wall for the first floor.
o Clean ducts and diffusers
Electrical
▪ Contractor to provide labor and materials to
o Remove and replace light bulbs with LED bulbs.
▪ lay ins (4 bulbs)
▪ surface mounted 1 x 4 fixtures (4 bulbs)
▪ Battery backup emergency lights 2 downstairs ADA bathrooms
o Replace existing exterior light fixture at exit door on second floor with LED wall pack
with photocell.
o Confirmation of Panel Labeling
o Investigate exterior disconnect for appropriate size.
Allowance
o Patch drywall and re-install crown molding from IT department work and ceiling tile
replacement ($2,800)
Alternate Bid Item #1
▪ Contractor to provide labor and materials to
o Remove, clean, paint and re-install existing shutters with (2) coats exterior finish paint.
Alternate Bid Item #2
SCOPE OF WORK
Russell Street Reno
252 Russell Street
Ridgeland, SC
[3]
▪ Contractor to provide labor and materials
o Remove and dispose of all shutters
o Replace with Builder’s Edge 14.5”x72” Louvered Vinyl shutters
Alternate Bid Item #3
o Provide and install (2) 26/22.5 kw Air-Cooled Generac Stanby Generator, Aluminum
Enclosure with 200 amps TS, equipped with wifi
▪ Smart Management Heat Strip Load Control Connection
▪ 50 Amp Smart Management Connection
Alternate Bid Item #4
o Contractor to provide labor and materials to
▪ Paint interior ceilings - Eggshell Finish
Alternate Bid Item #5
▪ Contractor to provide labor and materials
o Remove and dispose of all shutters
o Caulk holes with paintable caulk, paint over existing penetrations.
Clarification
▪ Contractor to note
o The owner is responsible for providing a dumpster
Exclusions
▪ Contractor to note the following:
o Painting of drywall ceiling
o IT Department to furnish and install all necessary wiring and communications.
o Flooring in Restrooms and Kitchen areas.
o Finishes at 3rd floor and stairwell to 3rd floor.
o Paint of Interior Ceilings (alt 4)
o Relocation of phone cable supported by Oak tree limbs.
o Propane tank and connections to generator
o Generator locking device – Lock to put on generator covers
o Generator annunciator work
o Full lockset at backdoor
o Shutter scope (Alt 1, 2 or 4)
Details that Apply to All Work Areas
SCOPE OF WORK
Russell Street Reno
252 Russell Street
Ridgeland, SC
[4]
▪ Contractor to maintain clean work areas at all times, remove and dispose of all demolished
materials and construction debris.
▪ Parking will be made available for the Contractor by the Owner and the Contractor shall
coordinate all parking with the Owner prior to the beginning of work.
▪ Contractor shall coordinate inspections with the Owner as required.
▪ Upon completion of work, all construction areas shall be left clean and free from debris.
Warranty
▪ Provide all labor, material, and equipment warranties to the owner prior to project closeout.
Submittals
• The Contractor shall submit for approval the manufacturer’s cut sheets for materials utilized for
the project prior to commencing any work.
Permitting
▪ Contractor will be responsible for obtaining such applicable permits and the Owner will be
responsible for compensating the Contractor for permit fees and any design necessary to
obtain such permits or related approvals as described in the Gordian master contract
documents (i.e. permit fees are dollar for dollar reimbursable and professional design and
engineering fees are paid for at hourly rates published in the Construction Task Catalog).
Owner Responsibilities
▪ Provide access to the worksite during normal business hours.
▪ Provide a staging area for project related materials.
▪ Owner shall be responsible for re-routing pedestrian traffic as necessary.
Source: Jasper County website. First collected Oct 26, 2026.