RecordWell Data

Town Council Workshop — Agenda Packet

Town of Hilton Head Island · Beaufort County · Town Council · meeting of Sep 30, 2025 · Agenda packets

Open the original document More from Town of Hilton Head Island

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Town of Hilton Head Island Town Council Workshop Tuesday, September 30, 2025, 1:00 PM 1 Town Center Court, Hilton Head Island, SC Benjamin M. Racusin Council Chambers The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County Channel, and Spectrum Channel 1304. 1. Call to Order 2. Adoption of the Agenda 3. Workshop Discussion a. Stormwater Utility Program Update 4. Public Comment - Non Agenda Items 5. Adjournment FOIA Compliance: Public notification of this workshop has been published, posted, and distributed in compliance with the South Carolina Freedom of Information Act and the requirements of the Town of Hilton Head Island. In accordance with the requirements of Title II of the Americans with Disabilities Act of 1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified individuals with disabilities on the basis of disability in its services, programs, or activities. Auditory accommodations are available. Any person requiring further accommodation should contact the Town of Hilton Head Island ADA Coordinator as soon as possible but no later than 48 hours before the scheduled event. Municipal Association of South Carolina (MASC) Civility Pledge: “I pledge to build a stronger and more prosperous community by advocating for civil engagement, respecting others and their viewpoints, and finding solutions for the betterment of my city or town.” Page 1 of 33 Stephen G. Riley Municipal Complex One Town Center Court ⬧ Hilton Head Island ⬧ South Carolina ⬧ 29928 www.hiltonheadislandsc.gov TOWN OF HILTON HEAD ISLAND Town Council TO: Town Council FROM: Shawn Leininger, AICP, Deputy Town Manager Shawn Gillen, Interim Assistant Town Manager Jeff Netzinger, P.E., Engineering & Public Projects Director John Troyer, Finance Director CC: Marc Orlando, ICMA-CM, Town Manager DATE: September 23, 2025 SUBJECT: Stormwater Utility Program Workshop SUMMARY: To advance discussion and direction on the topic of the FY2026-2030 Stormwater Utility Program and funding, Town Staff will provide the attached draft presentation at the Town Council Workshop on September 30, 2025. This presentation will review the following topics: 1. FY2026-2028 Strategic Action Plan Priorities 2. Overview of Funding Source, Revenues, and Balances 3. Status of Current FY2026 Stormwater Capital Improvement P rogram ( CIP) Projects 4. Planned FY2027-2030 Stormwater CIP Projects 5. Funding Options to Support Planned Stormwater CIP Projects Town Staff anticipates a collaborative discussion with Town Council, to better understand and how to best advance planned Stormwater Utility Program initiatives in accordance with the FY26-28 Town Council Strategic Action Plan. ATTACHMENTS: 1. Stormwater Utility Program Workshop Presentation (Draft) Page 2 of 33 TOWN OF HILTON HEAD ISLAND Stormwater Utility Program Workshop Town Council I September 30, 2025 Page 3 of 33 1. FY2026-2028 Strategic Action Plan Priorities 2. Overview of Funding Source, Revenues, and Balances 3. Status of Current FY2026 Stormwater CIP Projects 4. Planned FY2027-2030 Stormwater CIP Projects 5. Funding Options to Support Planned Stormwater CIP Projects 6. General Discussion Agenda TOWN OF HILTON HEAD ISLAND 2 Page 4 of 33 FY2026-2028 Strategic Action Plan Priorities 3 Page 5 of 33 I TOWN OF HILTON HEAD ISLAND Strategic Action Plan Goals 4 Page 6 of 33 I TOWN OF HILTON HEAD ISLAND Strategic Action Plan Goals 5 Page 7 of 33 I TOWN OF HILTON HEAD ISLAND Page 8 of 33 Overview of Funding Source, Revenues, and Balances 7 Page 9 of 33 TOWN OF HILTON HEAD ISLAND Stormwater Utility Fund – Funding and Collection Rate Overview 8 • The Stormwater Utility (SWU) formed in 2001 to provide a funding source for addressing stormwater deficiencies throughout Beaufort County. • Beaufort County collects the fees annually and includes the fee on annual property tax bills. • The Town sets the base Single-Family Unit (SFU) rate and determines the rate structure to be utilized. The Town is afforded anopportunity to adjust the SFU rate annually, based on the SWU IGA with Beaufort County. • The SFU is set based on 4,906 square feet of impervious area. Fees for various parcel categories are calculated based on the base rate per the chart to the right. • Fees for Commercial properties vary based on parcel size and total measured impervious area. • The Current SFU rate of $150.00 is determined based on 3 components: o Administrative Fee Component (AFC) $ 24.00 o Impervious Area Component (IAC) $ 105.00 o Gross Area Component (GAC) $ 21.00 Page 10 of 33 TOWN OF HILTON HEAD ISLAND Stormwater Utility Fund – Single Family Unit (SFU) Rate History 9 • The Stormwater Utility was formed in 2001 • There have been five rate increases since 2005 • The current SFU rate is $150 • The last increase, following Hurricane Matthew, was approved eight years ago (38% increase) • No change in the rate was proposed for FY2026 • Current SFU rates for the four other SWU member entities: o Beaufort County: $100 o City of Beaufort: $135 o Town of Port Royal: $ 60 o Town of Bluffton: $115 Fiscal Year Hurricane Matthew Current Stormwater Fee Rate Structure allows the Town to utilize approximately $2.5million in annual capital improvements if no borrowing occurs. Page 11 of 33 TOWN OF HILTON HEAD ISLAND Stormwater Utility Fund – Revenue History 10 Fiscal Year Rate Increases Page 12 of 33 Stormwater Fund Revenues History TOWN OF HILTON HEAD ISLAND The Stormwater fee brings in just over $5 million annually – all operating & maintenance costs are covered by these fees. Page 13 of 33 Stormwater Fund Balance History TOWN OF HILTON HEAD ISLAND Page 14 of 33 Stormwater Debt Outstanding History TOWN OF HILTON HEAD ISLAND Page 15 of 33 FY 2026 Proposed CIP Uses of Funds TOWN OF HILTON HEAD ISLAND Use of Funds FY 2023 Actual FY 2024 Actual FY 2025 Revised Budget FY 2026 Proposed Budget FY26 to FY25 Budget $ Change FY26 to FY25 Budget % Change % of Budget Beach Program 1,153,510$ 2,404,079$ 21,599,000$ 48,820,000$ 27,221,000$ 126.03% 62.84% Pathway Program 312,853 1,527,321 5,500,000 1,650,000 (3,850,000) -70.00% 2.12% Roadway Program 4,361,824 2,770,550 10,317,218 5,079,500 (5,237,718) -50.77% 6.54% Park Program 1,396,152 2,323,598 19,815,273 10,636,000 (9,179,273) -46.32% 13.69% Facility & Equipment Program 5,036,029 3,623,957 8,402,291 4,721,000 (3,681,291) -43.81% 6.08% Stormwater Program 133,993 1,088,427 2,193,310 6,350,880 4,157,570 189.56% 8.17% Fleet Program 480,489 1,071,075 11,750,707 180,000 (11,570,707) -98.47% 0.23% Land Acquisition & Administration 7,826,584 12,019,174 3,225,000 250,000 (2,975,000) -92.25% 0.32% Housing 120,851 - - - - 0.00% 0.00% Transfers Out to Housing - 350,000 - - - 0.00% 0.00% Debt Service - 220,558 - - - 0.00% 0.00% Total Use of Funds 20,822,285$ 27,398,738$ 82,802,799$ 77,687,380$ (5,115,419)$ -6.18% 100.00% 14 Page 16 of 33 Status of Current FY2026 Stormwater CIP Projects 15 Page 17 of 33 FY 2026 CIP Project Dashboard (https://hiltonheadislandsc.gov/cip/) TOWN OF HILTON HEAD ISLAND 16 Page 18 of 33 TOWN OF HILTON HEAD ISLAND FY 2026 Stormwater CIP Projects Overview • Current Status of Stormwater CIP Projects o Planning 5 Projects o Design 8 Projects o Construction 4 Projects • Project Delivery Challenges & Opportunities o Easement / right-of-way acquisition o Contractor availability / capacity o Staff capacity to manage projects 17 Page 19 of 33 TOWN OF HILTON HEAD ISLAND FY 2026 CIP Project Map – Current Project Status 18 Page 20 of 33 TOWN OF HILTON HEAD ISLAND FY 2026 Stormwater Program Capital Improvement Projects 19 Project Name FY26 Budget Status Project Description Stormwater Maintenance & Improvement Program * $ 1,800,000 Construction Public System Corrective Maintenance Projects Stormwater Maintenance Agreement Program * $ 2,000,000 Construction Agreements Program Projects and Reimbursements Moonshell Road / Folly Field Neighborhood Improvements $ 60,000 Design Improve ditch capacity within the neighborhood and increase pipe and ditch capacity downstream 75 Helmsman Way Drainage Improvements $ 50,000 Planning Increase pipe capacity and install tidal backflow prevention devices Bryant Road Pond Restoration $ 25,000 Planning Remove organics and sediment from shallow lagoons and connect the pond to the outfall with a new pipe Cordillo Courts Drainage Improvements $ 95,880 Design Install a new piped system to address road ponding issues adjacent to the tennis courts Gum Tree Road Drainage Improvements $ 120,000 Design Adding new pipe connections and improving ditches in several locations between School Drive & Wild Horse Rd Jarvis Creek Outfall $ 50,000 Design Installing new backflow preventive devices in two locations underneath the Cross Island Parkway Jarvis Creek Pump Station - Pump Replacements $ 300,000 Planning Replacing one of four existing pumps approaching the end of their useful life Main Street Drainage Improvements $ 50,000 Planning Pipe cleaning and video inspection Old Woodlands-26 Indian Trail Improvements $ 80,000 Design Install pipe and improve ditch connections adjacent to Aquatera Palmetto Hall Outfall Improvements $ 150,000 Design Install new pipe and backflow prevention devices to mitigate risk of roadway and structure flooding in the upstream system Water Level Monitoring $ 75,000 Construction Install devices to dynamically monitor water surface elevations to aid in pre-storm preparation and to inform future CIP design Weather Monitoring $ 50,000 Construction Install weather stations to provide real-time data during storm events and to inform future CIP design Central Island Pump Station Overhaul and Resilience Improvements $ 750,000 Design Install new infrastructure and replace aging infrastructure at this critical facility located between Wexford and Log Cove Club. Gum Tree Channel Capacity Improvements at Chinaberry Crossing $ 120,000 Design Improve capacity and address public safety concerns at the roadway culvert crossing Arrow Road Laydown Yard Improvements $ 75,000 Planning Install rock in the yard to address chronic roadway tracking issues Total $ 6,350,880 Including the $500,000 Stormwater Program contingency Page 21 of 33 Planned FY2027-2030 Stormwater CIP Projects 20 Page 22 of 33 FY2027-2030 Stormwater CIP Projects Overview PLANNED FY27-30 CIP PROJECTS • Major investment in stormwater infrastructure is needed to preserve and enhance public safety and protect property • Project scopes and costs are not yet fully realized for all fiscal year 2027-2030 projects • Town considerations for project delivery include: o Prioritization o Scope o Schedule o Phasing o Cash versus debt • Challenges and opportunities moving forward o Easement acquisition o Contractor availability / capacity o Staff capacity to manage projects 21 Page 23 of 33 TOWN OF HILTON HEAD ISLAND Stormwater Program Planned Capital Improvement Projects 22 Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total Stormwater Maintenance & Improvement Program * $ 1,800,000 $ 1,200,000 $ 1,200,000 $ 1,200,000 $ 1,200,000 $ 6,600,000 Stormwater Maintenance Agreement Program * $ 2,000,000 $ 1,800,000 $ 1,900,000 $ 2,000,000 $ 2,100,000 $ 9,800,000 Moonshell Road / Folly Field Neighborhood Improvements $ 60,000 $ 900,000 $ 960,000 75 Helmsman Way Drainage Improvements $ 50,000 $ 120,000 $ 550,000 $ 720,000 Bryant Road Pond Restoration $ 25,000 $ 30,000 $ 55,000 Cordillo Courts Drainage Improvements $ 95,880 $ 95,880 Gum Tree Road Drainage Improvements $ 120,000 $ 50,000 $ 170,000 Jarvis Creek Outfall $ 50,000 $ 280,000 $ 850,000 $ 1,180,000 Jarvis Creek Pump Station - Pump Replacements $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 1,200,000 Main Street Drainage Improvements $ 50,000 $ 600,000 $ 650,000 Old Woodlands-26 Indian Trail Improvements $ 80,000 $ 40,000 $ 120,000 Palmetto Hall Outfall Improvements $ 150,000 $ 60,000 $ 200,000 $ 150,000 $ 1,500,000 $ 2,060,000 * Allocated funds support the Stormwater Corrective Maintenance Programs. Page 24 of 33 TOWN OF HILTON HEAD ISLAND Stormwater Program - Qualifying Corrective Maintenance Projects 23 o 163 Active Qualifying Service Requests o 59 new Service Requests since July 23 of this year. many of these are still begin evaluated. o Service Request data is tracked dynamically throughout the year o Project Locations ▪ Public drainage system: 38 ▪ Agreement program: 125 o Evaluation Scores ▪ Based on a 20-point scale ▪ Average score is 7.0 ▪ None score higher than 16 o Common Fixes Required ▪ Pipe repair and replacement ▪ Inlet structure repair ▪ Control structure repair ▪ Gate repair and replacement ▪ Pipe and ditch cleaning Page 25 of 33 TOWN OF HILTON HEAD ISLAND Stormwater Program – Drainage Agreement Program Partners 24 11 Original Agreement Partners, 2007 - 2012 • Hilton Head Plantation • Indigo Run • Leamington • Long Cove Club • Palmetto Dunes • Palmetto Hall 15 More Recent Partners, 2021 - 2024 • Ashton Cove • Beach City Place • Bermuda Pointe • Broad Creek Landing • Carolina Isles • Chinaberry Ridge • Jarvis Creek Club • Paddocks on Jarvis Creek 5 Current Applicants: • Cedar Woods • Crosswinds • Fuller Pointe 27 Potentially Qualifying Communities • Calibogue Club • Carolina Place (in SP) • Graham Lane Plantation • Hammock Breeze • Hanahan Place • Hilton Head Terrace • Jarvis Creek (Walking Horse) • Lake Forest (in SP) • Lands' End (in SP) • Little Cove Cottages • Magnolia Place • Oakview • Old House Creek • Old Stoney Creek • Silver Moss • Singleton by the Beach • Singleton Place • Spanish Pointe • Sunderland Point • Tansyleaf • The Marshes on Marshland • Tidal Bluff • Tide Pointe • Timber Crest • Turtle Lane Club (in SP) • The Cottages at Leg O Mutton • Village at Singleton Beach • Peregrine Point • Ribaut Island • Seagrass Landing • Spanish Wells • Victoria Square • Wells East • Yacht Cove • Port Royal • Sea Pines • Shelter Cove • Shipyard • Wexford 26 Active Agreements 32 Potentially Qualifying • Salt Creek Landing • The Estuary Page 26 of 33 TOWN OF HILTON HEAD ISLAND Stormwater Program Planned Capital Improvement Projects 25 Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total Stormwater Maintenance & Improvement Program * $ 1,800,000 $ 1,200,000 $ 1,200,000 $ 1,200,000 $ 1,200,000 $ 6,600,000 Stormwater Maintenance Agreement Program * $ 2,000,000 $ 1,800,000 $ 1,900,000 $ 2,000,000 $ 2,100,000 $ 9,800,000 Moonshell Road / Folly Field Neighborhood Improvements $ 60,000 $ 900,000 $ 960,000 75 Helmsman Way Drainage Improvements $ 50,000 $ 120,000 $ 550,000 $ 720,000 Bryant Road Pond Restoration $ 25,000 $ 30,000 $ 55,000 Cordillo Courts Drainage Improvements $ 95,880 $ 95,880 Gum Tree Road Drainage Improvements $ 120,000 $ 50,000 $ 170,000 Jarvis Creek Outfall $ 50,000 $ 280,000 $ 850,000 $ 1,180,000 Jarvis Creek Pump Station - Pump Replacements $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 1,200,000 Main Street Drainage Improvements $ 50,000 $ 600,000 $ 650,000 Old Woodlands-26 Indian Trail Improvements $ 80,000 $ 40,000 $ 120,000 Palmetto Hall Outfall Improvements $ 150,000 $ 60,000 $ 200,000 $ 150,000 $ 1,500,000 $ 2,060,000 * Allocated funds support the Stormwater Corrective Maintenance Programs. Page 27 of 33 TOWN OF HILTON HEAD ISLAND Stormwater Program Planned Capital Improvement Projects 26 Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total Water Level Monitoring $ 75,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 875,000 Weather Monitoring $ 50,000 $ 40,000 $ 40,000 $ 40,000 $ 40,000 $ 210,000 Central Island Pump Station Overhaul and Resiliency Improvements $ 750,000 $ 3,000,000 $ 3,500,000 $ 7,250,000 Ashmore Channel Resilience/278 Backflow Prevention Port Royal $ 15,000 $ 30,000 $ 300,000 $ 345,000 Gum Tree Channel Capacity Improvements at Chinaberry Crossing $ 120,000 $ 350,000 $ 470,000 24 Pope Avenue Outfall to Shipyard $ 40,000 $ 70,000 $ 100,000 $ 210,000 25 Dunnagans Alley Parking Lot Drainage Improvements $ 30,000 $ 30,000 Airport Outfall Ditch Relocation $ 200,000 $ 700,000 $ 900,000 Arrow Road Laydown Yard Improvements $ 75,000 $ 75,000 Arrow Road Outfall at Greenery $ 30,000 $ 100,000 $ 300,000 $ 430,000 Burkes Beach Area Drainage Improvements $ 40,000 $ 100,000 $ 300,000 $ 440,000 Gardner Channel Capacity Improvements at 278 $ 30,000 $ 50,000 $ 150,000 $ 230,000 Page 28 of 33 TOWN OF HILTON HEAD ISLAND Stormwater Program Planned Capital Improvement Projects 27 Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total Marshland Road Pathway Drainage Issues $ 120,000 $ 100,000 $ 100,000 $ 100,000 $ 420,000 Muddy Creek South Outfall $ 50,000 $ 80,000 $ 130,000 North Forest Beach Pipe Replacements/Rehabilitation $ 160,000 $ 160,000 $ 160,000 $ 160,000 $ 640,000 Shipyard Pump Station Overhaul $ 100,000 $ 250,000 $ 1,800,000 $ 2,150,000 Squire Pope Outfalls- Backflow Prevention (2 Locations) $ 60,000 $ 60,000 $ 120,000 The Links at Port Royal Improvements $ 50,000 $ 100,000 $ 500,000 $ 650,000 Woodlake Villas/Mathews Drive Outfall Improvements $ 20,000 $ 50,000 $ 300,000 $ 370,000 Woodward Avenue Pipe Rehabilitation $ 575,000 $ 575,000 Arrow Road Powerline Channel Excavation- Capacity Improvements $ 200,000 $ 200,000 Point Comfort – Sea Olive Road Outfall Improvements * $ 20,000 $ 50,000 $ 90,000 Shell Midden / Cordillo Parkway Drainage Improvements * $ 82,000 $ 800,000 $ 882,000 Stormwater Contingency ** $ 398,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 TOTALS $ 6,350,880 $ 10,175,000 $ 10,555,000 $ 7,170,000 $ 9,430,000 $ 41,802,880 * Recently identified and added to the Stormwater CIP Program ** Contingency account utilized to fund recently added projects Page 29 of 33 Stormwater CIP Funding Options 28 Page 30 of 33 TOWN OF HILTON HEAD ISLAND Stormwater CIP Funding Options 29 • The Stormwater fee brings in just over $5 million annually – all operating & maintenance costs are covered by these fees • Current Stormwater Fee Rate Structure allows the Town to utilize approximately $2.5 million in annual capital improvements if no borrowing occurs • The Finance Team suggests the Town could borrow with a 20 or 25-Year Payback period to finance more projects sooner • The budget process would be used to prioritize specific Stormwater projects for funding • The Finance Team recommends the Town consider any Stormwater borrowing to align with FY27 Budget Approval process timing • Stormwater Revenue Borrowing History: o $3,200,000 in 2018 Bonds payable through April 1, 2028 ($360k payments due April 1, 2027 & 2028) o $5,630,000 in 2021 Refunding Bonds will be paid off April 1, 2026, with the final $950,000 payment o Future fixed payments on debt limits future budget flexibility Page 31 of 33 General Discussion 30 Page 32 of 33 TOWN OF HILTON HEAD ISLAND Stormwater Utility Program Workshop Town Council I September 30, 2025 Page 33 of 33

Source: Town of Hilton Head Island website. First collected Oct 26, 2026.