Town Council Workshop — Agenda Packet
Town of Hilton Head Island · Beaufort County · Town Council · meeting of Sep 30, 2025 · Agenda packets
Open the original document More from Town of Hilton Head Island
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Town of Hilton Head Island
Town Council Workshop
Tuesday, September 30, 2025, 1:00 PM
1 Town Center Court, Hilton Head Island, SC
Benjamin M. Racusin Council Chambers
The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County
Channel, and Spectrum Channel 1304.
1. Call to Order
2. Adoption of the Agenda
3. Workshop Discussion
a. Stormwater Utility Program Update
4. Public Comment - Non Agenda Items
5. Adjournment
FOIA Compliance: Public notification of this workshop has been published, posted, and
distributed in compliance with the South Carolina Freedom of Information Act and the
requirements of the Town of Hilton Head Island.
In accordance with the requirements of Title II of the Americans with Disabilities Act of
1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified
individuals with disabilities on the basis of disability in its services, programs, or
activities. Auditory accommodations are available. Any person requiring further
accommodation should contact the Town of Hilton Head Island ADA Coordinator as
soon as possible but no later than 48 hours before the scheduled event.
Municipal Association of South Carolina (MASC) Civility Pledge:
“I pledge to build a stronger and more prosperous community by advocating for civil
engagement, respecting others and their viewpoints, and finding solutions for the
betterment of my city or town.”
Page 1 of 33
Stephen G. Riley Municipal Complex
One Town Center Court ⬧ Hilton Head Island ⬧ South Carolina ⬧ 29928
www.hiltonheadislandsc.gov
TOWN OF HILTON HEAD ISLAND
Town Council
TO: Town Council
FROM: Shawn Leininger, AICP, Deputy Town Manager
Shawn Gillen, Interim Assistant Town Manager
Jeff Netzinger, P.E., Engineering & Public Projects Director
John Troyer, Finance Director
CC: Marc Orlando, ICMA-CM, Town Manager
DATE: September 23, 2025
SUBJECT: Stormwater Utility Program Workshop
SUMMARY:
To advance discussion and direction on the topic of the FY2026-2030 Stormwater Utility
Program and funding, Town Staff will provide the attached draft presentation at the Town
Council Workshop on September 30, 2025. This presentation will review the following
topics:
1. FY2026-2028 Strategic Action Plan Priorities
2. Overview of Funding Source, Revenues, and Balances
3. Status of Current FY2026 Stormwater Capital Improvement P rogram ( CIP)
Projects
4. Planned FY2027-2030 Stormwater CIP Projects
5. Funding Options to Support Planned Stormwater CIP Projects
Town Staff anticipates a collaborative discussion with Town Council, to better understand
and how to best advance planned Stormwater Utility Program initiatives in accordance
with the FY26-28 Town Council Strategic Action Plan.
ATTACHMENTS:
1. Stormwater Utility Program Workshop Presentation (Draft)
Page 2 of 33
TOWN OF HILTON HEAD ISLAND
Stormwater Utility
Program Workshop
Town Council I September 30, 2025
Page 3 of 33
1. FY2026-2028 Strategic Action
Plan Priorities
2. Overview of Funding Source,
Revenues, and Balances
3. Status of Current FY2026
Stormwater CIP Projects
4. Planned FY2027-2030
Stormwater CIP Projects
5. Funding Options to Support
Planned Stormwater CIP
Projects
6. General Discussion
Agenda
TOWN OF HILTON HEAD ISLAND
2
Page 4 of 33
FY2026-2028
Strategic Action Plan Priorities
3
Page 5 of 33
I TOWN OF HILTON HEAD ISLAND
Strategic Action Plan Goals
4
Page 6 of 33
I TOWN OF HILTON HEAD ISLAND
Strategic Action Plan Goals
5
Page 7 of 33
I TOWN OF HILTON HEAD ISLAND
Page 8 of 33
Overview of Funding Source,
Revenues, and Balances
7
Page 9 of 33
TOWN OF HILTON HEAD ISLAND
Stormwater Utility Fund – Funding and Collection Rate Overview
8
• The Stormwater Utility (SWU) formed in 2001 to provide a funding source for addressing stormwater
deficiencies throughout Beaufort County.
• Beaufort County collects the fees annually and includes the fee on annual property tax bills.
• The Town sets the base Single-Family Unit (SFU) rate and determines the rate structure to be
utilized. The Town is afforded anopportunity to adjust the SFU rate annually, based on the SWU IGA
with Beaufort County.
• The SFU is set based on 4,906 square feet of impervious area. Fees for various parcel categories
are calculated based on the base rate per the chart to the right.
• Fees for Commercial properties vary based on parcel size
and total measured impervious area.
• The Current SFU rate of $150.00 is
determined based on 3 components:
o Administrative Fee Component (AFC) $ 24.00
o Impervious Area Component (IAC) $ 105.00
o Gross Area Component (GAC) $ 21.00
Page 10 of 33
TOWN OF HILTON HEAD ISLAND
Stormwater Utility Fund – Single Family Unit (SFU) Rate History
9
• The Stormwater Utility
was formed in 2001
• There have been five rate
increases since 2005
• The current SFU rate is $150
• The last increase, following
Hurricane Matthew, was
approved eight years ago (38%
increase)
• No change in the rate was
proposed for FY2026
• Current SFU rates for the four
other SWU member entities:
o Beaufort County: $100
o City of Beaufort: $135
o Town of Port Royal: $ 60
o Town of Bluffton: $115
Fiscal Year
Hurricane Matthew
Current Stormwater Fee Rate Structure allows the Town to utilize approximately $2.5million in annual capital improvements if no borrowing occurs.
Page 11 of 33
TOWN OF HILTON HEAD ISLAND
Stormwater Utility Fund – Revenue History
10
Fiscal Year
Rate Increases
Page 12 of 33
Stormwater Fund Revenues History
TOWN OF HILTON HEAD ISLAND
The Stormwater fee brings in just over $5 million annually – all operating & maintenance costs are covered by these fees.
Page 13 of 33
Stormwater Fund Balance History
TOWN OF HILTON HEAD ISLAND
Page 14 of 33
Stormwater Debt Outstanding History
TOWN OF HILTON HEAD ISLAND
Page 15 of 33
FY 2026 Proposed CIP Uses of Funds
TOWN OF HILTON HEAD ISLAND
Use of Funds
FY 2023
Actual
FY 2024
Actual
FY 2025
Revised
Budget
FY 2026
Proposed
Budget
FY26 to
FY25 Budget
$ Change
FY26 to
FY25 Budget
% Change
% of
Budget
Beach Program 1,153,510$ 2,404,079$ 21,599,000$ 48,820,000$ 27,221,000$ 126.03% 62.84%
Pathway Program 312,853 1,527,321 5,500,000 1,650,000 (3,850,000) -70.00% 2.12%
Roadway Program 4,361,824 2,770,550 10,317,218 5,079,500 (5,237,718) -50.77% 6.54%
Park Program 1,396,152 2,323,598 19,815,273 10,636,000 (9,179,273) -46.32% 13.69%
Facility & Equipment Program 5,036,029 3,623,957 8,402,291 4,721,000 (3,681,291) -43.81% 6.08%
Stormwater Program 133,993 1,088,427 2,193,310 6,350,880 4,157,570 189.56% 8.17%
Fleet Program 480,489 1,071,075 11,750,707 180,000 (11,570,707) -98.47% 0.23%
Land Acquisition & Administration 7,826,584 12,019,174 3,225,000 250,000 (2,975,000) -92.25% 0.32%
Housing 120,851 - - - - 0.00% 0.00%
Transfers Out to Housing - 350,000 - - - 0.00% 0.00%
Debt Service - 220,558 - - - 0.00% 0.00%
Total Use of Funds 20,822,285$ 27,398,738$ 82,802,799$ 77,687,380$ (5,115,419)$ -6.18% 100.00%
14
Page 16 of 33
Status of Current
FY2026 Stormwater CIP Projects
15
Page 17 of 33
FY 2026 CIP Project Dashboard (https://hiltonheadislandsc.gov/cip/)
TOWN OF HILTON HEAD ISLAND
16
Page 18 of 33
TOWN OF HILTON HEAD ISLAND
FY 2026 Stormwater CIP
Projects Overview
• Current Status of Stormwater CIP Projects
o Planning 5 Projects
o Design 8 Projects
o Construction 4 Projects
• Project Delivery Challenges & Opportunities
o Easement / right-of-way acquisition
o Contractor availability / capacity
o Staff capacity to manage projects
17
Page 19 of 33
TOWN OF HILTON HEAD ISLAND
FY 2026 CIP Project Map –
Current Project Status
18
Page 20 of 33
TOWN OF HILTON HEAD ISLAND
FY 2026 Stormwater Program Capital Improvement Projects
19
Project Name FY26 Budget Status Project Description
Stormwater Maintenance & Improvement Program * $ 1,800,000 Construction Public System Corrective Maintenance Projects
Stormwater Maintenance Agreement Program * $ 2,000,000 Construction Agreements Program Projects and Reimbursements
Moonshell Road / Folly Field Neighborhood Improvements $ 60,000 Design Improve ditch capacity within the neighborhood and increase pipe
and ditch capacity downstream
75 Helmsman Way Drainage Improvements $ 50,000 Planning Increase pipe capacity and install tidal backflow prevention devices
Bryant Road Pond Restoration $ 25,000 Planning Remove organics and sediment from shallow lagoons
and connect the pond to the outfall with a new pipe
Cordillo Courts Drainage Improvements $ 95,880 Design Install a new piped system to address road ponding issues adjacent
to the tennis courts
Gum Tree Road Drainage Improvements $ 120,000 Design Adding new pipe connections and improving ditches in several
locations between School Drive & Wild Horse Rd
Jarvis Creek Outfall $ 50,000 Design Installing new backflow preventive devices in two locations
underneath the Cross Island Parkway
Jarvis Creek Pump Station - Pump Replacements $ 300,000 Planning Replacing one of four existing pumps approaching the end of their
useful life
Main Street Drainage Improvements $ 50,000 Planning Pipe cleaning and video inspection
Old Woodlands-26 Indian Trail Improvements $ 80,000 Design Install pipe and improve ditch connections adjacent to Aquatera
Palmetto Hall Outfall Improvements $ 150,000 Design Install new pipe and backflow prevention devices to mitigate risk of
roadway and structure flooding in the upstream system
Water Level Monitoring $ 75,000 Construction Install devices to dynamically monitor water surface elevations to aid
in pre-storm preparation and to inform future CIP design
Weather Monitoring $ 50,000 Construction Install weather stations to provide real-time data during storm
events and to inform future CIP design
Central Island Pump Station Overhaul and Resilience Improvements $ 750,000 Design Install new infrastructure and replace aging infrastructure at this
critical facility located between Wexford and Log Cove Club.
Gum Tree Channel Capacity Improvements at Chinaberry Crossing $ 120,000 Design Improve capacity and address public safety concerns at the roadway
culvert crossing
Arrow Road Laydown Yard Improvements $ 75,000 Planning Install rock in the yard to address chronic roadway tracking issues
Total $ 6,350,880 Including the $500,000 Stormwater Program contingency
Page 21 of 33
Planned FY2027-2030
Stormwater CIP Projects
20
Page 22 of 33
FY2027-2030 Stormwater CIP
Projects Overview
PLANNED FY27-30 CIP PROJECTS
• Major investment in stormwater infrastructure is needed to
preserve and enhance public safety and protect property
• Project scopes and costs are not yet fully realized for
all fiscal year 2027-2030 projects
• Town considerations for project delivery include:
o Prioritization
o Scope
o Schedule
o Phasing
o Cash versus debt
• Challenges and opportunities moving forward
o Easement acquisition
o Contractor availability / capacity
o Staff capacity to manage projects
21
Page 23 of 33
TOWN OF HILTON HEAD ISLAND
Stormwater Program Planned Capital Improvement Projects
22
Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total
Stormwater Maintenance & Improvement Program * $ 1,800,000 $ 1,200,000 $ 1,200,000 $ 1,200,000 $ 1,200,000 $ 6,600,000
Stormwater Maintenance Agreement Program * $ 2,000,000 $ 1,800,000 $ 1,900,000 $ 2,000,000 $ 2,100,000 $ 9,800,000
Moonshell Road / Folly Field Neighborhood Improvements $ 60,000 $ 900,000 $ 960,000
75 Helmsman Way Drainage Improvements $ 50,000 $ 120,000 $ 550,000 $ 720,000
Bryant Road Pond Restoration $ 25,000 $ 30,000 $ 55,000
Cordillo Courts Drainage Improvements $ 95,880 $ 95,880
Gum Tree Road Drainage Improvements $ 120,000 $ 50,000 $ 170,000
Jarvis Creek Outfall $ 50,000 $ 280,000 $ 850,000 $ 1,180,000
Jarvis Creek Pump Station - Pump Replacements $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 1,200,000
Main Street Drainage Improvements $ 50,000 $ 600,000 $ 650,000
Old Woodlands-26 Indian Trail Improvements $ 80,000 $ 40,000 $ 120,000
Palmetto Hall Outfall Improvements $ 150,000 $ 60,000 $ 200,000 $ 150,000 $ 1,500,000 $ 2,060,000
* Allocated funds support the Stormwater Corrective Maintenance Programs.
Page 24 of 33
TOWN OF HILTON HEAD ISLAND
Stormwater Program - Qualifying Corrective Maintenance Projects
23
o 163 Active Qualifying Service
Requests
o 59 new Service Requests since
July 23 of this year. many of these
are still begin evaluated.
o Service Request data is tracked
dynamically throughout the year
o Project Locations
▪ Public drainage system: 38
▪ Agreement program: 125
o Evaluation Scores
▪ Based on a 20-point scale
▪ Average score is 7.0
▪ None score higher than 16
o Common Fixes Required
▪ Pipe repair and replacement
▪ Inlet structure repair
▪ Control structure repair
▪ Gate repair and replacement
▪ Pipe and ditch cleaning
Page 25 of 33
TOWN OF HILTON HEAD ISLAND
Stormwater Program – Drainage Agreement Program Partners
24
11 Original Agreement Partners, 2007 - 2012
• Hilton Head Plantation
• Indigo Run
• Leamington
• Long Cove Club
• Palmetto Dunes
• Palmetto Hall
15 More Recent Partners, 2021 - 2024
• Ashton Cove
• Beach City Place
• Bermuda Pointe
• Broad Creek Landing
• Carolina Isles
• Chinaberry Ridge
• Jarvis Creek Club
• Paddocks on Jarvis Creek
5 Current Applicants:
• Cedar Woods
• Crosswinds
• Fuller Pointe
27 Potentially Qualifying Communities
• Calibogue Club
• Carolina Place (in SP)
• Graham Lane Plantation
• Hammock Breeze
• Hanahan Place
• Hilton Head Terrace
• Jarvis Creek (Walking Horse)
• Lake Forest (in SP)
• Lands' End (in SP)
• Little Cove Cottages
• Magnolia Place
• Oakview
• Old House Creek
• Old Stoney Creek
• Silver Moss
• Singleton by the Beach
• Singleton Place
• Spanish Pointe
• Sunderland Point
• Tansyleaf
• The Marshes on Marshland
• Tidal Bluff
• Tide Pointe
• Timber Crest
• Turtle Lane Club (in SP)
• The Cottages at Leg O Mutton
• Village at Singleton Beach
• Peregrine Point
• Ribaut Island
• Seagrass Landing
• Spanish Wells
• Victoria Square
• Wells East
• Yacht Cove
• Port Royal
• Sea Pines
• Shelter Cove
• Shipyard
• Wexford
26 Active Agreements 32 Potentially Qualifying
• Salt Creek Landing
• The Estuary
Page 26 of 33
TOWN OF HILTON HEAD ISLAND
Stormwater Program Planned Capital Improvement Projects
25
Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total
Stormwater Maintenance & Improvement Program * $ 1,800,000 $ 1,200,000 $ 1,200,000 $ 1,200,000 $ 1,200,000 $ 6,600,000
Stormwater Maintenance Agreement Program * $ 2,000,000 $ 1,800,000 $ 1,900,000 $ 2,000,000 $ 2,100,000 $ 9,800,000
Moonshell Road / Folly Field Neighborhood Improvements $ 60,000 $ 900,000 $ 960,000
75 Helmsman Way Drainage Improvements $ 50,000 $ 120,000 $ 550,000 $ 720,000
Bryant Road Pond Restoration $ 25,000 $ 30,000 $ 55,000
Cordillo Courts Drainage Improvements $ 95,880 $ 95,880
Gum Tree Road Drainage Improvements $ 120,000 $ 50,000 $ 170,000
Jarvis Creek Outfall $ 50,000 $ 280,000 $ 850,000 $ 1,180,000
Jarvis Creek Pump Station - Pump Replacements $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 1,200,000
Main Street Drainage Improvements $ 50,000 $ 600,000 $ 650,000
Old Woodlands-26 Indian Trail Improvements $ 80,000 $ 40,000 $ 120,000
Palmetto Hall Outfall Improvements $ 150,000 $ 60,000 $ 200,000 $ 150,000 $ 1,500,000 $ 2,060,000
* Allocated funds support the Stormwater Corrective Maintenance Programs.
Page 27 of 33
TOWN OF HILTON HEAD ISLAND
Stormwater Program Planned Capital Improvement Projects
26
Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total
Water Level Monitoring $ 75,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 875,000
Weather Monitoring $ 50,000 $ 40,000 $ 40,000 $ 40,000 $ 40,000 $ 210,000
Central Island Pump Station Overhaul and Resiliency Improvements $ 750,000 $ 3,000,000 $ 3,500,000 $ 7,250,000
Ashmore Channel Resilience/278 Backflow Prevention Port Royal $ 15,000 $ 30,000 $ 300,000 $ 345,000
Gum Tree Channel Capacity Improvements at Chinaberry Crossing $ 120,000 $ 350,000 $ 470,000
24 Pope Avenue Outfall to Shipyard $ 40,000 $ 70,000 $ 100,000 $ 210,000
25 Dunnagans Alley Parking Lot Drainage Improvements $ 30,000 $ 30,000
Airport Outfall Ditch Relocation $ 200,000 $ 700,000 $ 900,000
Arrow Road Laydown Yard Improvements $ 75,000 $ 75,000
Arrow Road Outfall at Greenery $ 30,000 $ 100,000 $ 300,000 $ 430,000
Burkes Beach Area Drainage Improvements $ 40,000 $ 100,000 $ 300,000 $ 440,000
Gardner Channel Capacity Improvements at 278 $ 30,000 $ 50,000 $ 150,000 $ 230,000
Page 28 of 33
TOWN OF HILTON HEAD ISLAND
Stormwater Program Planned Capital Improvement Projects
27
Project Name FY26 FY27 FY28 FY29 FY30 5-Year Total
Marshland Road Pathway Drainage Issues $ 120,000 $ 100,000 $ 100,000 $ 100,000 $ 420,000
Muddy Creek South Outfall $ 50,000 $ 80,000 $ 130,000
North Forest Beach Pipe Replacements/Rehabilitation $ 160,000 $ 160,000 $ 160,000 $ 160,000 $ 640,000
Shipyard Pump Station Overhaul $ 100,000 $ 250,000 $ 1,800,000 $ 2,150,000
Squire Pope Outfalls- Backflow Prevention (2 Locations) $ 60,000 $ 60,000 $ 120,000
The Links at Port Royal Improvements $ 50,000 $ 100,000 $ 500,000 $ 650,000
Woodlake Villas/Mathews Drive Outfall Improvements $ 20,000 $ 50,000 $ 300,000 $ 370,000
Woodward Avenue Pipe Rehabilitation $ 575,000 $ 575,000
Arrow Road Powerline Channel Excavation- Capacity Improvements $ 200,000 $ 200,000
Point Comfort – Sea Olive Road Outfall Improvements * $ 20,000 $ 50,000 $ 90,000
Shell Midden / Cordillo Parkway Drainage Improvements * $ 82,000 $ 800,000 $ 882,000
Stormwater Contingency ** $ 398,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000
TOTALS $ 6,350,880 $ 10,175,000 $ 10,555,000 $ 7,170,000 $ 9,430,000 $ 41,802,880
* Recently identified and added to the Stormwater CIP Program ** Contingency account utilized to fund recently added projects
Page 29 of 33
Stormwater CIP
Funding Options
28
Page 30 of 33
TOWN OF HILTON HEAD ISLAND
Stormwater CIP Funding Options
29
• The Stormwater fee brings in just over $5 million annually – all operating & maintenance
costs are covered by these fees
• Current Stormwater Fee Rate Structure allows the Town to utilize approximately $2.5
million in annual capital improvements if no borrowing occurs
• The Finance Team suggests the Town could borrow with a 20 or 25-Year Payback period
to finance more projects sooner
• The budget process would be used to prioritize specific Stormwater projects for funding
• The Finance Team recommends the Town consider any Stormwater borrowing to align
with FY27 Budget Approval process timing
• Stormwater Revenue Borrowing History:
o $3,200,000 in 2018 Bonds payable through April 1, 2028 ($360k payments due April 1,
2027 & 2028)
o $5,630,000 in 2021 Refunding Bonds will be paid off April 1, 2026, with the final
$950,000 payment
o Future fixed payments on debt limits future budget flexibility
Page 31 of 33
General Discussion
30
Page 32 of 33
TOWN OF HILTON HEAD ISLAND
Stormwater Utility
Program Workshop
Town Council I September 30, 2025
Page 33 of 33
Source: Town of Hilton Head Island website. First collected Oct 26, 2026.