RecordWell Data

Planning Commission Meeting — Agenda Packet

Town of Hilton Head Island · Beaufort County · Planning Commission · meeting of Sep 17, 2025 · Agenda packets

Open the original document More from Town of Hilton Head Island

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Town of Hilton Head Island Planning Commission Meeting Wednesday, September 17, 2025, 2:00 PM 1 Town Center Court, Hilton Head Island, SC Benjamin M. Racusin Council Chambers The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County Channel, and Spectrum Channel 1304. 1. Call to Order 2. Pledge to the Flag 3. Adoption of the Agenda 4. Approval of the Minutes a. Regular Meeting Minutes of August 20, 2025 5. Unfinished Business a. Consideration of an Ordinance of the Town of Hilton Head Island to Amend Chapter 16 of the Municipal Code, the Land Management Ordinance, to Amend the Traffic Impact Analysis Plan Requirements and Traffic Analysis Standards in Land Management Ordinance Sections 16-2-103, 16-5-106 and Appendix D, and Providing for Severability and an Effective Date - Shea Farrar, Pricipal Planner 6. New Business a. PPR-000829-2025- Public Hearing Request from Scott Harris, with the Town of Hilton Head Island, for the Public Project Review for a new park facility on the Town-owned parcel located at 23 Marshland Road. The affected parcel is Beaufort County Tax Map Parcel R510 008 000 008D 0000. - Shea Farrar, Pricipal Planner 7. Public Comment - Non Agenda Items 8. Commission Business 9. Chairman's Report 10. Staff Reports Page 1 of 58 a. DPR-001043-2024 – Axis Engineering Consultants is proposing the development of an Aldi grocery store at Sea Turtle Marketplace. The subject property is located at 80 Mathews Drive and is identified as Beaufort County Tax Map Parcel R511 008 000 0156 0000. - Michael Connolly, Senior Planner b. DPR-000104-2025 - Casey Warfield of Kimley-Horn and Associates is proposing the redevelopment of 70 Pope Ave for a grocery store. The subject properties are identified as Beaufort County Tax Map Parcels R553 018 000 0268 0000 and R553 018 000 0269 0000. - Michael Connolly, Senior Planner c. DPR-000518-2025 - James Atkins, of Court Atkins Group, is proposing the redevelopment of 2 Tanglewood Drive for multifamily use. The subject property is identified as Beaufort County Tax Map Parcel R553 018 000 0330 0000. - Brian Eber, Principal Planner 11. Adjournment FOIA Compliance: Public notification of this meeting has been published, posted, and distributed in compliance with the South Carolina Freedom of Information Act and the requirements of the Town of Hilton Head Island. In accordance with the requirements of Title II of the Americans with Disabilities Act of 1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified individuals with disabilities on the basis of disability in its services, programs, or activities. Auditory accommodations are available. Any person requiring further accommodation should contact the Town of Hilton Head Island ADA Coordinator as soon as possible but no later than 48 hours before the scheduled event. Municipal Association of South Carolina (MASC) Civility Pledge: “I pledge to build a stronger and more prosperous community by advocating for civil engagement, respecting others and their viewpoints, and finding solutions for the betterment of my city or town.” Page 2 of 58 Town of Hilton Head Island Planning Commission Meeting Minutes 8/20/2025 Page | 1 Town of Hilton Head Island PLANNING COMMISSION MEETING Wednesday, August 20, 2025, 2:00 PM Minutes 1. Call to Order 2. Pledge to the Flag 3. Adoption of the Agenda Commissioner Lobaugh made a motion to adopt the agenda as presented. Commissioner Siebold seconded. Motion carried 9-0. 4. Chairman's Report a. New Member Welcome - Mayor Alan Perry Mayor Alan Perry welcomed new members to the Planning Commission. 5. Approval of the Minutes a. Regular Meeting Minutes of July 16, 2025 Vice Chair Whaley made a motion to approve the meeting minutes of July 16, 2025. Commissioner Siebold seconded. Motion carried 9-0. 6. Unfinished Business 7. New Business a. STDV-000661-2025 – Consideration of a Public Hearing for a street name request from Brendan Barr of One Street Residential proposing to name four new streets off Northpointe Circle. The affected parcels are identified on Beaufort County Tax Maps as Parcels R510 007 000 0121 0000, R510 007 000 0219 0000, R510 007 000 0228 0000, R510 007 000 0230 0000, R510 007 000 0231 0000, R510 007 000 0232 0000, R510 007 000 0233 0000, R510 007 000 0234 0000, R510 007 000 0235 0000, R510 007 000 0236 0000, R510 007 000 0237 0000, R510 007 000 0238 0000, R510 007 000 0239 0000, R510 007 000 0240 0000, R510 007 000 0241 0000, R510 007 000 0242 0000, R510 007 000 0243 0000, and R510 007 000 0265 0000. - Joheida Fister, Deputy Fire Chief Chairman Henz introduced the item and declared the Public Hearing open. Kathleen Litchfield, 911 Communications Manager, presented a proposal for 4 new streets off Northpoint Circle named Northpoint, Fairfiled Station, Dunebrook Court, and Fencliff Trail. Following the opportunity for public comment and Commission discussion, the Public Hearing was closed. Page 3 of 58 Town of Hilton Head Island Planning Commission Meeting Minutes 8/20/2025 Page | 2 A motion was made by Commissioner Lobaugh to approve the naming of the streets as presented. Commissioner Redman seconded. The motion passed unanimously. b. Public Hearing for Consideration of an Ordinance of the Town of Hilton Head Island to Amend Title 16 of the Municipal Code, the Land Management Ordinance, to Amend Sections 16-3-105.H, 16-4-102.A.6, 16-4-105, and 16-4-102.B.1 to allow residential Workforce Housing within the Medical (MED) Zoning District. - Shawn Leininger, Assistant Town Manager Chairman Henz introduced the item and declared the Public Hearing open. Ben Brown, Director of Strategic Initiatives, presented an Ordinance to Amend Chapter 16 of the Municipal Code, the Land Management Ordinance, to allow for residential Workforce Housing within the Medical Zoning District. There was an opportunity for public comment and Commission discussion. The Public Hearing was left open. Staff indicated that additional information was needed for the associated rezoning, so the action should be postponed to stay on the same track as the rezoning. A motion was made by Vice Chair Whaley to postpone the decision until the September 17, 2025 Planning Commission meeting. Chairman Cordes seconded the motion. The motion passed unanimously. c. Public Hearing for Consideration of an Ordinance of the Town of Hilton Head Island to Amend the Official Zoning Map with Respect to the Real Property located at Bethea Drive to Amend the Palmetto Headlands/H.H. Hospital Master Plan within the Planned Development Overlay District (PD-2) for Beaufort County Tax Map Parcels R510 008 000 337A 0000, R510 008 000 0337 0000 and R510 008 000 0452 0000 to change the allocated uses from Commercial Use to Commercial or Residential Use and to Provide for Severability and an Effective Date. - Shawn Leininger, Assistant Town Manager Chairman Henz introduced the item and declared the Public Hearing open. Ben Brown, Director of Strategic Iniatives, presented the rezoning request, to amend the Palmetto Headlands/Hilton Head Hospital Master Plan within the Planned Development Overlay District (PD-2) to change the allocated uses from Commercial Use to Commericlal or Residential Use. The applicant then presented to the Committee. Brian Quinn and Keith Kostrzewski, of Abode spoke regarding the project. Abode is the developer for the project with Novant Health and the Coastal Community Development Corporation as partners in support. Joel Taylor of Novant Health discussed his company's involvement with the project to provide workforce housing to hospital employees. Dave Wetmore, Vice Chair of the Coastal Community Development Corporation, spoke about their involvement in the project as the property manager. Staff indicated that additional information related to the Palmetto Headlands and the Plannded Development Overlay (PD-2) was needed so the action should be postponed. Page 4 of 58 Town of Hilton Head Island Planning Commission Meeting Minutes 8/20/2025 Page | 3 There was an opportunity for public comment and Commission discussion. The Public Hearing was left open. A motion was made by Vice Chair Whaley to postpone the decision on the applicant until the September 17, 2025 meeting. Commissioner Sielbold seconded the motion. The motion passed unanimously. d. PPR-000119-2025 - Public Hearing Request from Scott Harris, with the Town of Hilton Head Island, for the Public Project Review for a new park facility on the Town- owned parcel located at 252 Wild Horse Road. The affected parcel is Beaufort County Tax Map Parcel R510 003 000 0027 0000. - Brian Eber, Principal Planner Chairman Henz introduced the item and declared the Public Hearing open. Brian Eber, Principal Planner, presented a new park facility on Town-owned property at 252 Wild Horse Road for Public Project Review. Following an opportunity for public comment and Commission discussion, the Public Hearing was closed. A motion was made by Commissioner Lobaugh to approve the Public Project Review Application as presented. Commissioner Siebold seconded. The motion passed unanimously. 8. Public Comment - Non Agenda Items 9. Commission Business a. Nomination and Recommendation to Town Council of Two (2) Planning Commission Members to Fill Vacancies on the Gullah Geechee Land & Cultural Preservation Task Force Commissioner Siebold nominated Commissioners Lobaugh and Hewitt for appointment to the Gullah Geechee Land & Cultural Preservation Task Force. The nominations will be forwarded to Town Council for approval.All were in favor. b. Appointment of Board Secretary for July 1, 2025 - June 30, 2026 Term This item will be taken up at a later date. 10. Staff Reports a. DPR-000412-2025 – Jennifer Palmer of Seamon Whiteside & Associates, on behalf of The Town of Hilton Head Island, is proposing a Workforce Housing Development Project at 10 Northpointe Circle. This new development consists of multifamily units and townhome cottages, totaling 157 units and supporting infrastructure. The subject property is zoned Moderate to High Density Residential District (RM-12) and is located within the Corridor Overlay. The affected parcels are identified on Beaufort County Tax Map 7 as Parcels R510 007 000 0121 0000, R510 007 000 0219 0000, R510 007 000 0230 0000, R510 007 000 0232 0000, R510 007 000 0233 0000, R510 007 000 0234 0000, R510 007 000 0235 0000, R510 007 000 0236 0000, Page 5 of 58 Town of Hilton Head Island Planning Commission Meeting Minutes 8/20/2025 Page | 4 R510 007 000 0237 0000, R510 007 000 0238 0000, R510 007 000 0239 0000, R510 007 000 0240 0000, R510 007 000 0241 0000, R510 007 000 0242 0000, R510 007 000 0243 0000, and R510 007 000 0265 0000. - Michael Connolly, Senior Planner Chairman Henz introduced the item. Ben Brown, Senior Advisor to the Town Manager, presented a Development Plan Review as submitted by Seamon Whiteside & Associates proposing a 157-unit Workforce Housing Project at 10 Northpoint Circle. Following an opportunity for public comment the Commission concluded discussion on the project and thanked Mr. Brown for his work to date on this project. The Public Hearing was closed. 11. Adjournment Chairman Henz adjourned the meeting at 4:10pm The full recording and a transcript of this meeting can be found on the Town’s website at www.hiltonheadislandsc.gov Page 6 of 58 Stephen G. Riley Municipal Complex One Town Center Court  Hilton Head Island  South Carolina  29928 www.hiltonheadislandsc.gov TOWN OF HILTON HEAD ISLAND Planning Commission TO: Planning Commission FROM: Shea Farrar, Principal Planner VIA: Michelle Melaer, Community Planning Manager CC: Shawn Leininger, Assistant Town Manager Marc Orlando, Town Manager DATE: September 17, 2025 SUBJECT: Consideration of an Ordinance of the Town of Hilton Head Island to Amend Chapter 16 of the Municipal Code, the Land Management Ordinance, to Amend the Traffic Impact Analysis Plan Requirements and Traffic Analysis Standards in Land Management Ordinance Sections 16- 2-103, 16 -5-106 and Appendix D, and Providing for Severability and an Effective Date RECOMMENDATION: Consideration of an Ordinance to Amend Chapter 16 of the Municipal Code, t he Land Management Ordinance, to Amend t he Traffic Impact Analysis Plan Requirements and Traffic Analysis Standards in 16-2-103, 16-5-106, and Appendix D ., and to provide for severability and an effective date, and forward a recommendation to Town Council. The Planning Commission held a public hearing on April 16, 2025, and, after consideration of the criteria set forth in Land Management Ordinance (LMO) Section 16- 2-103, voted unanimously to recommend that Town Council approve the proposed text amendment. On May 19, 2025, the Community Services and Public Safety Committee voted unanimously to recommend approval to Town Council. with the following items addressed prior to first reading: 1. Ensure inclusion of downstream impacts on traffic to the requirements; 2. Consider raising level of service to higher than an “F”; 3. Ensure the changes do not impact redevelopment opportunities and consider a definition of blighted; 4. Clarify the size of the area to be analyzed when the traffic impact is studied; and 5. Consider what multimodal means to Hilton Head Island now and in the future. Page 7 of 58 Page 2 of 2 On August 19, 2025, Town Council reviewed the proposed amendment, including changes based on the direction from CSPS and voted unanimously to approve first reading of the amendment. The LMO requires that any change or departure from the text amendment that is different than what was recommended by the Planning Commission shall first be submitted back to the Planning Commission for review and recommendation in accordance with State law. Following review and recommendation by the Planning Commission of the additional changes, the text amendment ordinance will be returned to Town Council for second reading. PLANNING COMMISSION ACTION: LMO Sec.16-2-103-B.2.d states that the Planning Commission's recommendation shall be based on the standards in Sec. 16- 2-103.B.3, Ordinance Text Amendment Review Standards. The Planning Commission has the following options when considering this agenda item. These include: 1. Recommend approval to Town Council. 2. Recommend denial to Town Council. 3. Recommend approval with conditions to Town Council. ATTACHMENTS: 1. Staff Report 2. Ordinance 3. Text Amendment (as recommended by the Planning Commission with changes highlighted in yellow) Page 8 of 58 Stephen G. Riley Municipal Complex One Town Center Court ⬧ Hilton Head Island ⬧ South Carolina ⬧ 29928 www.hiltonheadislandsc.gov TOWN OF HILTON HEAD ISLAND Town Council TO: Town Council FROM: Shawn Leininger, Assistant Town Manager CC: Marc Orlando, Town Manager DATE: August 19, 2025 SUBJECT: Consideration of an Ordinance of the Town of Hilton Head Island to Amend Chapter 16 of the Municipal Code, the Land Management Ordinance, to Amend the Traffic Impact Analysis Plan Requirements and Traffic Analysis Standards in Land Management Ordinance Sections 16 -2-103, 16 -5-106 and Appendix D, and Providing for Severability and an Effective Date RECOMMENDATION: Consideration of an Ordinance to Amend Chapter 16 of the Municipal Code, the Land Management Ordinance, to Amend the Traffic Impact Analysis Plan Requirements and Traffic Analysis Standards in 16-2-103, 16-5-106, and Appendix D ., and to provide for severability and an effective date, and forward a recommendation to Town Council. The Planning Commission held a public hearing on April 16, 2025, and, after consideration of the criteria set forth in Land Management Ordinance (LMO) Section 16- 2-103, voted unanimously to recommend that Town Council approve the proposed text amendment. On May 19, 2025, the Community Services and Public Safety Committee voted unanimously to recommend approval to Town Council. with the following items addressed prior to first reading: 1. Ensure inclusion of downstream impacts on traffic to the requirements; 2. Consider raising level of service to higher than an “F”; 3. Ensure the changes do not impact redevelopment opportunities and consider a definition of blighted; 4. Clarify the size of the area to be analyzed when the traffic impact is studied; and 5. Consider what multimodal means to Hilton Head Island now and in the future. Page 9 of 58 Page 2 of 11 BACKGROUND: Revitalize and Modernize the Economy is a focus area in the adopted Town Council 2023- 2025 Strategic Action Plan. In fulfillment of this focus area, Strategy #1 Establish a Growth Management Strategy states the Town will: “Successfully manage increasing and evolving future growth patterns in a manner that will ensure sustainability of Hilton Head Island’s unique character. Additionally, the Town must monitor economic and demographic trends, undertaking a comprehensive list o f future planning activities, and proactively protecting the Island’s rich natural resources through appropriate design, regulation, and capital investment practices.” In this regard, Town Council directed Town Staff to advance amendments to the Land Management Ordinance (LMO) in the 2024 Strategic Action Work Plan. The effort has been divided into two separate projects, the f ull LMO Overhaul and the priority amendments. The priority amendments include incremental changes to both the LMO and portions of the Municipal Code related to land management that address important and urgent issues in advance of the full LMO Overhaul. These priority amendments address pressing community development issues with the best short-term solution while minimizing unintended outcomes. Issues that require additional analysis and research or are more complex are recommended to be further explored during the full LMO Overhaul. At the September 24, 2024, Town Council Workshop, Town staff received the following comments and direction regarding amendments related to Traffic Impact Analysis. 1. Change name from Traffic Impact Analysis to Transportation Impact Analysis Plan (TIAP) to account for a multimodal approach (ie: car, bicycle, pedestrian, public transit, plane, etc.) 2. Reduce the threshold a develop ment needs to meet to trigger a mandatory TIA P from 100 peak hour trips to 50 peak hour trips. 3. Include multimodal infrastructure (suc h as bike paths, sidewalks, transit) in the analysis. 4. Include more impact mitigation options. 5. Clarify subject matter approval by the Town Engineer instead of the LMO Official as a best practice. 6. Add unsignalized intersections level of service standard including mitigation requirements and remove the discounting of impacts due to “background traffic ,” (i.e. the trips generated by previously existing development). The Planning Commission held a public hearing on April 16, 2025, and, after consideration of the criteria set forth in Land Management Ordinance (LMO) Section 16- 2-103, voted unanimously to recommend that Town Council approve the proposed text amendment. On May 19, 2025, the Community Services and Public Safety Committee voted unanimously to recommend approval to Town Council with items to be addressed prior Page 10 of 58 Page 3 of 11 to first reading. The following is a list of the Committee items followed by a response / action taken to address each item: 1. Ensure inclusion of downstream impacts on traffic to the requirements. The study area to be considered within Transportation Impact Analysis Plan studies is determined in accordance with Appendix D -11(B)8, which requires that a minimum of three signalized intersections on major arterials to be analyzed. Any traffic circle or roundabout may be included as a study intersection analyzed at the direction of the Town Engineer, and the Town Engineer may request that unsignalized intersections be analyzed, effectively vesting the Town Engineer with the authority to determine the study area limits. Section 16-5-105(A)5.e, which is not proposed for revision, requires that site access for all development review applications be compliant with SCDOT’s design standards as outlined in their Access and Roadside Management Standards manual relative to geometric design and the need to provide any turn lanes. 2. Consider raising level of service to higher than an “F”. A level of service of “F” is not accepted. The standards within the existing and proposed text establish a minimum threshold level of service of “D”. 3. Ensure the changes do not impact redevelopment opportunities and consider a definition of blighted. To find a balance between the mitigation of traffic impacts from development and supporting the redevelopment of properties that previously generated traffic, Town staff have proposed the following amendment to Section 16-2-103.J.4.b., “If the proposed development is located on a previously developed parcel, then the number of peak hour trips projected to be generated by the proposed development shall be reduced by the number of trips generated by the previous development during the peak hour for the preceding twenty four months. If the resulting number is less than 50 peak hour trips, a Transportation Impact Analysis Plan is not required for the proposed development.” 4. Clarify the size of the area to be analyzed when the traffic impact is studied. Similar to item 1 above, t he study area to be considered within a Transportation Impact Analysis Plan is determined in accordance with Appendix D-11(B)8, which requires that a minimum of three signalized intersections on major arterials to be analyzed. Any traffic circle or roundabout may be included as a study intersection analyzed at the direction of the Town Engineer, and the Town Engineer may request that unsignalized intersections be analyzed, effectively vesting the Town Engineer with the authority t o determine the study area limits. Section 16 -5- 105.A.5.e. already requires that site access for all development review applications be compliant with SCDOT’s design standards as outlined in their Access and Page 11 of 58 Page 4 of 11 Roadside Management Standards manual relative to geometric design and the need to provide any turn lanes. 5. Consider what multimodal means to Hilton Head Island now and in the future. Multimodal is a common transportation term that involves the use of multiple modes of transport for moving people or goods. The most typical modes are walking, biking, public transit, railways, motor vehicles, waterways, and airways. In the case of Hilton Head Island and the LMO, multimodal considers the movement of people and goods on roadways and pathways to encompass a variety of users, including motorists, transit users, carriers of goods, cyclists, and pedestrians, including those with disabilities. SUMMARY OF AMENDMENT: Effective transportation planning is essential for managing growth, ensuring mobility, and maintaining a safe and efficient transportation network. As communities develop, new projects introduce additional traffic, impacting roads, intersections, and multi modal infrastructure such as sidewalks, bike lanes, and transit systems. Without proper assessment, development can lead to congestion, safety hazards, and infrastructure strain. For the Town, t his type of assessment is conducted during the development approval process and involves a detailed study of projected traffic volumes, travel patterns, and potential impacts on roadway safety and congestion. The analysis helps determine whether improvements , such as roadway expansions, new traffic signals, pedestrian enhancements, or transit service modifications , are necessary to maintain efficient and safe travel conditions as identified by the study parameters. While these studies are designed to assess how new projects affect traffic, there are concerns about whether the Town’s current process and requirements truly addresses the needs of residents and adequately mitigate transportation impacts resulting from new development and redevelopment . As part of the priority amendments, the Town is proposing to update its current requirements for these studies for a more comprehensive approach that better reflects the transportation needs of everyone, including pedestrians, cyclists, and transit users. The proposed amendments strengthen the Town’s requirements by: 1. Expanding the scope of stud y beyond traffic to include multimodal infrastructure such as sidewalks, bike lanes, and transit services, 2. Reducing the threshold for requiring a traffic study from 100 peak-hour trips to 50 peak-hour trips, ensuring that even moderate developments undergo proper transportation impact review, 3. Expanding the type of mitigation options that can be used to address transportation impacts, Page 12 of 58 Page 5 of 11 4. Shifting approval authority from the LMO Official to the Town Engineer for consistency with best practices, 5. Adding new standards for unsignalized intersections, and 6. Eliminating exemptions associated with trips generated by previously existing development. These updates will make the Town’s process more responsive to the community's needs and promote a more balanced, multimodal, and forward -thinking approach to transportation planning, ensuring that growth aligns with the Town’s long -term mobility and infrastructure goals . These changes are part of an ongoing effort to update the Town’s regulations, with further revisions expected during the full LMO update. ANALYSIS: Proposed Amendments The Town currently requires a “Traffic Impact Analysis Plan.” Examples of projects that recently required a TIAP include: 1. 147 Residential Units on Jonesville Road and 2. 132 Residential Units on Office Way It is proposed to be renamed to the “Transportation Impact Analysis Plan” (TIAP) to reflect a more comprehensive, multimodal approach that includes biking, walking, and transit. Oversight of TIAPs has shifted from the LMO Official to the Town Engineer to ensure technical accuracy and alignment with best practices. As part of this amendment, the threshold for requiring a TIAP is proposed to be lowered from 100 to 50 peak hour trips, thereby increasing the number of projects subject to analysis. For instance, two recent projects that were not required to provide a TIA P but were exempted due to the trips factored in for previously existing development would have been required to provide a TIAP under the proposed language are the following: 1. Timeshare development on Folly Field Road near Islanders Beach Park and 2. Waterfront restaurant on Squire Pope Road near the Rowing and Sailing Center at Squire Pope Community Park The proposed TIAP amendments would also require the evaluation of multimodal infrastructure, such as bike paths, sidewalks, and public transit options. Transportation impacts can be mitigated by expanded and more flexible mitigation strategies to address transportation impacts, such as replacing a traffic signal or uncontrolled intersection with a roundabout that meets the Town’s operational and design standards , c hanges to locations or design of median crossovers and removal of changes to the number and location, or design of access points. Additionally, new standards for unsignalized intersections have been introduced, requiring mitigation for impacts. Page 13 of 58 Page 6 of 11 The following table demonstrates how the proposed amendments address demonstrated issues. Issue Proposed Amendment Clarify subject matter approval by the Town Engineer instead of the LMO Official as a best practice. The Town Engineer is now referenced throughout the text amendment as the decision-making authority concerning Transportation Impact Analysis Review. Change name from Traffic Impact Analysis Plan to Transportation Impact Analysis Plan to account for a multimodal approach. Reduce the threshold a developer needs to meet to trigger a mandatory TIA from 100 peak hour trips to 50 peak hour trips. Sec.16-2-103. Application Specific Review Procedures J. Traffic Transportation Impact Analysis Plan Review 1. Applicability a. The A Traffic Transportation Impact Analysis Plan, monitoring and mitigation requirements, and procedures set forth in this section are applicable to all development as defined in this Title that would generate 50 or more peak hour trips, except for that as specifically exempted in paragraph 4 below of this subsection. Add unsignalized intersections level of service standard including mitigation requirements. Chapter 16-5-106: C. Traffic Impact Analysis Plan Service Level Standards 3. The average total day delay on any approach to a traffic circle or roundabout the Sea Pines Circle does not exceed 150 seconds per vehicle during the peak hour for an average July weekday, and the average total delay on any approach to any other traffic circle or roundabout does not exceed 55.0 seconds per vehicle during the peak hour for an average July weekday; and 4. The Level of Service (LOS) for any vehicular traffic movement does not decline by more than one level per the requirements of the Highway Capacity Manual (HCM), nor to a Level of Service of “F”; and Page 14 of 58 Page 7 of 11 5. The development causes safety issues or delays that require mitigation as determined by the Town Engineer. Include multimodal infrastructure (such as bike paths, sidewalks, transit) in the analysis. Appendix D: Application Submittal Requirements D-11. Traffic Transportation Impact Analysis Plan Review B. Submittal Requirements 7. The impact on non-motorized travel shall be based on the procedures and practices recommended by ITE, Transportation Research Board (TRB), AASHTO and FHWA. The applicant shall incorporate where possible any non -motorized recommendations included in Town and/or regional long-term plans in the vicinity of the site. The study should identify potential changes such as: a. Improvements to pedestrian crossings; b. Additional pedestrian or bicycle crossings; c. Improvements to pedestrian signals, pedestrian signal intervals, signs, and pavement markings; d. Construction of additional sidewalks or non - motorized pathways; e. Changes to the site design and access to ease non-motorized travel and reduce conflicts with vehicles, from the public right -of-way to the building entrances or on-site activity; and f. Other similar improvements to transportation facilities. Modify the discounting of impacts due to “background traffic.” i.e. the trips generated by previously existing development. Per the recommendation of Community Services Public Safety Committee, a 4. Exemptions The following types of development shall be exempt from the Traffic Transportation Impact Analysis Plan and mitigation requirements of this section: b. Development that would generate fewer than peak hour trips on the adjacent street. i. If the proposed development will be replacing a vacant or occupied structure on the same site, then for the purpose of Page 15 of 58 Page 8 of 11 modification has been drafted to support the redevelopment of property (see yellow highlighted text). determining exemptions, the number of peak hour trips generated by the proposed land use shall be reduced by the number of peak hour trips generated by the most recent legally established land use. ii. Proof of the most recent principal land use of a site shall be the responsibility of the applicant and shall be submitted to the Official for approval. Absent such proof, the peak hour trip rate will be based on the lowest trip generation of all the uses permitted by right in the site's zoning district. b. If the proposed development is located on a previously developed parcel, then the number of peak hour trips projected to be generated by the proposed development shall be reduced by the number of trips generated by the previous development during the peak hour for the preceding twenty four months. If the resulting number is less than 50 peak hour trips, a Transportation Impact Analysis Plan is not required for the proposed development. Include more impact mitigation options. Appendix D: Application Submittal Requirements D-11. Traffic Transportation Impact Analysis Plan Review B. Submittal Requirements 8. 10. If the initial computerized analysis indicates that the Town's adopted traffic service level standards will be not be met, a mitigation plan must be included in the plan based on at least one additional computer analysis. This mitigation plan must show how the Town's adopted traffic service level standards will be satisfied. Applicants will only shall be responsible to mitigate the traffic transportation impacts of their proposed Page 16 of 58 Page 9 of 11 development. Acceptable roadway mitigation measures are limited to the following: a. Traffic signal timing adjustments; timing or phasing revisions, that not only mitigate traffic impacts generated by this development, but also result in safe and acceptable operations at the study intersection as demonstrated by a network traffic analysis; b. Traffic signal phasing adjustments; Addition of signs, signals, markings, or other measures to accommodate road crossings and improve safety for pedestrians and achieve ADA compliance; c. Pavement marking revisions; d. Adding additional intersection turn lanes not to exceed 4 lanes on minor arterial approaches and 5 lanes on major arterial approaches; and e. Geometric improvements to traffic circles or roundabouts signalized or unsignalized intersections, including traffic circles or roundabouts, to improve traffic operations, pedestrian and bicycle operations or to improve safety; f. Road widening; g. Adding a traffic signal at a location that is warranted per the Manual of Uniform Traffic Control (MUTCD); h. Replacing a traffic signal or uncontrolled intersection with a roundabout that meets the Town’s operational and design standards; i. Changes to locations or design of median crossovers to reduce congestion and mitigate accidents; j. Removal of changes to the number and location, or design of access points to reduce congestion and mitigate accidents; k. Additional signage; l. Other transportation-related safety improvements identified and/or recommended by the Town Engineer. Page 17 of 58 Page 10 of 11 Nonconformities Chapter 16-7 provides standards for nonconformities. This amendment will not create nonconformities and is not applicable. Text Amendment Review Standards Section 16-2-103.B.3 of the LMO provides standards for the review of Text Amendments and states the following: “In determining whether to recommend that Town Council adopt or deny the proposed text amendment, the Planning Commission may weigh the relevance of and consider whether and the extent to which the proposed Text Amendment: a. Is in accordance with the Comprehensive Plan; b. Is required by changed conditions; c. Addresses a demonstrated community need; d. Is consistent with the purpose and intent of the zoning districts in this Ordinance, or would improve compatibility among uses and ensure efficient development within the Town; e. Would result in a logical and orderly development pattern; and f. Would not result in significantly adverse impacts on the natural environment, including but not limited to water, air, noise, stormwater management, wildlife, vegetation, wetlands, and the natural functioning of the environment.” The proposed text amendment aligns with the review criteria, as it: 1. Supports the Comprehensive Plan , which includes the following strategy and tactic: “Maintain, evaluate, and update as needed traffic analysis standards to guide development in accordance with the existing and future needs of the Town.” 2. Is required due to increased traffic and congestion. 3. Addresses a demonstrated community need to mitigate traffic impact and includes consideration of essential multimodal transportation options. 4. Ensures that overall transportation impacts and mitigation efforts are consistent with the intent of the LMO. 5. Results in safer and less congested streets and intersections ensuring orderly development and transportation networks. 6. Minimizes the overall impact of Town-wide development and resulting traffic. TOWN COUNCIL REVIEW AND DECISION: Section 16 -2-103.B.2.e of the LMO provides standards for the decision of Text Amendments. The Town Council shall review th e application, staff report, and Planning Commission recommendation and make a final decision on the application. The Town Council's decision shall be one of the following: Page 18 of 58 Page 11 of 11 1. In this case, should Town Council support the Community Services Public Safety Committee recommendations, any change or departure from the text amendment that is different than what was recommended by the Planning Commission shall first be submitted back to the Planning Commission for review and recommendation in accordance with State law. Following review and recommendation by the Planning Commission of the additional changes, the text amendment ordinance will be returned to Town Council for second reading. 2. Otherwise, Town Council shall: a. Adopt an ordinance approving the Text Amendment as recommended by Planning Commission; or b. Adopt a resolution denying the Text Amendment. ATTACHMENTS: 1. Ordinance 2. Text Amendment (as recommended by Planning Commission with Community Services Public Safety Committee recommendations in yellow highlighted text) Page 19 of 58 Attachment 1 –Transportation Impact Analysis Amendment Ordinance Page 1 of 4 AN ORDINANCE OF THE TOWN OF HILTON HEAD ISLAND ORDINANCE NO. 2025-____ AN ORDINANCE OF THE TOWN OF HILTON HEAD ISLAND TO AMEND CHAPTER 16 OF THE MUNICIPAL CODE, THE LAND MANAGEMENT ORDINANCE, TO AMEND THE TRAFFIC IMPACT ANALYSIS PLAN REQUIREMENTS AND TRAFFIC ANALYSIS STANDARDS IN LAND MANAGEMENT ORDINANCE SECTIONS 16-2-103, 16-5-106 AND APPENDIX D, AND PROVIDING FOR SEVERABILITY AND AN EFFECTIVE DATE. WHEREAS, The Town Council previously adopted a Strategic Action Plan for 2023- 2025, and Strategy Number 1 states that the Town will: Successfully manage increasing and evolving future growth patterns in a manner that will ensure sustainability of Hilton Head Island’s unique character. Additionally, the Town must monitor economic and demographic trends, undertaking a comprehensive list of future planning activities, and proactively protecting the Island’s rich natural resources through appropriate design, regulation, and capital investment practices; and, WHEREAS, at its September 24, 2024, Town Council Workshop, Town staff received the following comments and direction regarding amendments to the Land Management Ordinance related to Traffic Impact Analysis Standards: 1. Change name from Traffic Impact Analysis to Transportation Impact Analysis Plan to account for a multimodal approach. 2. Reduce the threshold a developer needs to meet to trigger a mandatory TIA from 100 peak hour trips to 50 peak hour trips. 3. Include multimodal infrastructure (such as bike paths, sidewalks, transit) in the analysis 4. Include more impact mitigation options. 5. Clarify subject matter approval by the Town Engineer instead of the LMO Official as a best practice. 6. Add unsignalized intersections level of service standard including mitigation requirements and remove the discounting of impacts due to “background traffic,” (i.e., the trips generated by previously existing development); and, WHEREAS, the Town Council finds that Traffic Impact Analysis studies are important tools and assist the Town in avoiding congestion in the streets, undue concentration of population, safety hazards and overburdening of public infrastructure and also assist the Town in facilitating the creation of a convenient, attractive, and harmonious community; and, Attachment 2 Page 20 of 58 Attachment 1 –Transportation Impact Analysis Amendment Ordinance Page 2 of 4 WHEREAS, the Town Council finds that the best interests of the Town, and the health, safety and welfare of its citizens, property owners, residents and visitors will be furthered by an amendment to the Land Management Ordinance Traffic Impact Analysis Plan Requirements and Traffic Analysis Standards to change the title to Transportation Impact Analysis Plan, amend applicability requirements, modify the threshold for requiring an analysis plan, increase mitigation options to modernize the transportation review process, prioritize multimodal considerations, and ensure a thorough evaluation of development impacts on the transportation network by including the following requirements:  Expanding the scope of Traffic Impact Analysis studies to include multimodal infrastructure such as sidewalks, bike lanes, and transit services,  Reducing the threshold for requiring a study from 100 peak-hour trips to 50 peak- hour trips, ensuring that even moderate developments undergo proper transportation impact review,  Expanding the type of mitigation options that can be used to address transportation impacts,  Shifting approval authority from the LMO Official to the Town Engineer for consistency with best practices,  Adding new standards for unsignalized intersections, and  Eliminating exemptions associated with trips generated by previously existing development; and, WHEREAS, the Town Council finds that these requirements will make the development review process more responsive to the community's needs and promote a more balanced, multimodal, and forward-thinking approach to transportation planning, ensuring that growth aligns with the Town’s long-term mobility and infrastructure goals and that these things are in the best interests of the Town, and that the health, safety and welfare of its citizens, property owners, residents and visitors will be furthered by them; and, WHEREAS, on April 16, 2025, the Planning Commission held a Public Hearing to consider the proposed amendments to change the applicability and to include multimodal options, and the public had an opportunity to comment on the proposed amendments, and the Planning Commission voted unanimously to recommend that Town Council adopt the amendments Land Management Ordinance Traffic Impact Analysis Plan Requirements and Traffic Analysis Standards; and, WHEREAS, on May 19, 2025, the Community Services and Public Safety Committee discussed the proposed amendments to change the applicability and include multimodal options, and voted ___ to recommend that Town Council adopt the amendments Land Management Ordinance Traffic Impact Analysis Plan Requirements and Traffic Analysis Standards; and, WHEREAS, the Town Council finds that the best interests of the Town, and the health, safety and welfare of its citizens, property owners, residents and visitors will be furthered by this amendment to the Land Management Ordinance Traffic Impact Analysis Page 21 of 58 Attachment 1 –Transportation Impact Analysis Amendment Ordinance Page 3 of 4 Plan Requirements and Traffic Analysis Standards which will aid in avoiding congestion in the streets, undue concentration of population, safety hazards and overburdening of public infrastructure and also assist the Town in facilitating the creation of a convenient, attractive, and harmonious community. NOW, THEREFORE, BE IT ORDERED AND ORDAINED BY THE TOWN COUNCIL FOR THE TOWN OF HILTON HEAD ISLAND, SOUTH CAROLINA, AND IT IS HEREBY ORDERED AND ORDAINED BY AND UNDER AUTHORITY OF SAID TOWN COUNCIL, AS FOLLOWS: Section 1. Amendment. That the Land Management Ordinance is amended as shown on Exhibit “A” to this Ordinance. Newly added language is illustrated with double underline and deleted language is illustrated with strikethrough. Section 2. Severability. If any section, phrase, sentence, or portion of this Ordinance is for any reason held invalid or unconstitutional by any court of competent jurisdiction, such portion shall be deemed a separate, distinct, and independent provision, and such holding shall not affect the validity of the remaining portions thereof. Section 3. Effective Date. This Ordinance shall be effective upon its adoption by the Town Council of the Town of Hilton Head Island, South Carolina. Page 22 of 58 Attachment 1 –Transportation Impact Analysis Amendment Ordinance Page 4 of 4 PASSED, APPROVED, AND ADOPTED BY THE COUNCIL FOR THE TOWN OF HILTON HEAD ISLAND ON THIS _____ DAY OF __ , 2025. THE TOWN OF HILTON HEAD ISLAND, SOUTH CAROLINA ____________________________ Alan R. Perry, Mayor ATTEST: _____________________________ Kimberly Gammon, Town Clerk First Reading: Second Reading: APPROVED AS TO FORM: _____________________________ Curtis L. Coltrane, Town Attorney Page 23 of 58 Attachment 3: Exhibit A: Transportation Impact Analysis Plan Amendment Chapter 16-2: Administration Sec.16-2-103. Application Specific Review Procedures J. Traffic Transportation Impact Analysis Plan Review 1. Purpose The purpose of this subsection is to establish procedures and standards for the review and decision on Traffic Transportation Impact Analysis Plans, to ensure new development does not create street congestion beyond an amount established as acceptable by the Town. 2. Applicability a. The A Traffic Transportation Impact Analysis Plan, monitoring and mitigation requirements, and procedures set forth in this section are applicable to all development as defined in this Title that would generate 50 or more peak hour trips, except for thatas specifically exempted in paragraph 4 belowof this subsection. b. Development Plan approval, with or without conditions or modifications, nor a Building Permit, shall not be granted until without the applicant has received for Development Plan approval first obtaining Traffic of a Transportation Impact Analysis Plan approval in accordance with this section, in addition to all other requirements, unless the development is specifically exempt as provided for in this Chapter. c. A Building Permit may not be issued for development undertaken in accordance with a previously issued final development permit until the applicant first obtains Traffic Transportation Impact Analysis Plan approval, unless the development is exempt. 3. Trip Generation Rates Trip generation rates shall be taken from the most current edition of the Institute of Transportation Engineers'ITE Trip Generation Manual (ITE Manual), except; provided, however, that an applicant may elect to perform, at the applicant's expense, a trip generation study which shall be submitted to the Official Town Engineer in determining an exemption. The An applicant’s trip generation study shall be undertaken by a qualified traffic transportation engineering firm selected in accordance with Appendix D.11, and is subject to review and approval by the Official Town Engineer. For any proposed uses use not specifically listed in the ITE Manual, the Official Town Engineer shall determine the most appropriate trip generation rate. The Official Town Engineer may consider input from the applicant in making this decision. Trip rates shall be generated for pass-by trips, internal trips and multi-modal trips that are generated by a mode other than a personal motor vehicle. Trip rate reductions must Page 24 of 58 Page 2 of 14 be supported by the ITE handbooks or, if local data is used, approved by the Town Engineer. 4. Exemptions The following types of development shall be exempt from the Traffic Transportation Impact Analysis Plan and mitigation requirements of this section: a. Activities and uses not constituting development (see Sec. 16-1-104.B, Development Activities Constituting Development), or exempt from Development Plan approval (see Sec. 16-2-103.G.3, Exemptions). b. Development that would generate fewer than 100 peak hour trips on the adjacent street. i. If the proposed development will be replacing a vacant or occupied structure on the same site, then for the purpose of determining exemptions, the number of peak hour trips generated by the proposed land use shall be reduced by the number of peak hour trips generated by the most recent legally established land use. ii. Proof of the most recent principal land use of a site shall be the responsibility of the applicant and shall be submitted to the Official for approval. Absent such proof, the peak hour trip rate will be based on the lowest trip generation of all the uses permitted by right in the site's zoning district. If the proposed development is located on a previously developed parcel, then the number of peak hour trips projected to be generated by the proposed development shall be reduced by the number of trips generated by the previous development during the peak hour for the preceding twenty four months. If the resulting number is less than 50 peak hour trips, a Transportation Impact Analysis Plan is not required for the proposed development. b. A residential development generating less than 200 peak hour trips in which at least 20 percent of the units will qualify and be maintained as affordable housing in accordance with this Ordinance. 5. Traffic Transportation Impact Analysis Plan Review Procedure a. Application Submittal An application for Traffic Transportation Impact Analysis Plan Review may be submitted by persons identified in Sec. 16-2-102.C.1, and shall be submitted in accordance with Sec. 16-2-102.C. b. Staff Review and Action I. No or Minor Mitigation Required Page 25 of 58 Page 3 of 14 For any proposed development that does not require any mitigation or for which mitigation is limited to adjustments to signal timing, signal phasing, or intersection restriping, or improvements serving non-motorized travel, the Official Town Engineer shall review and make a final decision on the application in accordance with Sec. 16-2-102.D. The Official's decision shall be based on the standards in Sec. 16-2-103.J.6, Traffic Transportation Impact Analysis Plan Standards, and shall be one of the following: 01. Approve the application as submitted; 02. Approve the application subject to conditions of approval or modifications; or 03. Deny the application. II. Major Mitigation Required Page 26 of 58 Page 4 of 14 Where the proposed development requires mitigation beyond just adjustments to signal timing, signal phasing, or intersection re-striping, or improvements serving non-motorized travel, the Official Town Engineer shall review the application and prepare a staff report with a recommendation for action in accordance with Sec. 16-2-102.D. The Official's Town Engineer’s recommendation shall be based on the standards in Sec. 16-2-103.J.6, Traffic Transportation Impact Analysis Plan Standards. Any mitigation improvements should comply with the latest edition of SCDOT’s Access and Roadside Management Standards (ARMS) manual and SCDOT Roadway Design Manual. c. Decision-Making Body Review and Decision I. For any proposed development that requires mitigation beyond just adjustments to signal timing, signal phasing, or intersection re-striping, the Planning Commission shall review the application and staff report at a public meeting and make a final decision on the application in accordance with Sec. 16-2- 102.G. The Commission's decision shall be based on the standards in Sec. 16-2- 103.J.6, Traffic Transportation Impact Analysis Plan Standards, and shall be one of the following: 01. Approve the Traffic Transportation Impact Analysis Plan as submitted; 02. Approve the Traffic Transportation Impact Analysis Plan subject to conditions of approval or modifications; or 03. Deny the Traffic Transportation Impact Analysis Plan. II. Traffic Transportation Impact Analysis Plans containing mitigation other than that allowed in Appendix D (specifically D-11.B.8) will not be accepted. d. Post-Decision Actions and Limitations I. Notice of Decision The Official Town Engineer shall provide notice of the final decision on the application in accordance with Sec. 16-2-102.H.1. II. Appeal 01. Appeals from the final decision of the Official Town Engineer on an application for Traffic Transportation Impact Analysis Plan Review are governed by Sec. 16-2-103.U, Appeal of Official's Decision to Planning Commission, and S.C. Code Ann. § 6-29-1150. 02. Appeals from the decision of the Planning Commission on an application for Traffic Transportation Impact Analysis Plan Review are governed by S.C. Code Ann. § 6-29-1150. Page 27 of 58 Page 5 of 14 6. Traffic Transportation Impact Analysis Plan Standards The proposed Traffic Transportation Impact Analysis Plan shall not be approved unless it is demonstrated the Town's street system can operate and comply with the Town's adopted traffic service level standards, and the plan complies with Sec. 16-5-106, Traffic Transportation Analysis Standards. 7. Expiration of Approval A Traffic Transportation Impact Analysis Plan approval shall expire after one (1) year from the date of approval unless the applicant submits a complete Development Plan review application. 8. Amendment A Traffic Transportation Impact Analysis Plan may be amended only in accordance with the procedures and standards for applicable to its original approval. 9. Traffic Transportation Mitigation Program Implementation a. Timing of Implementation If a traffic transportation mitigation program is part of an approved Traffic Transportation Impact Analysis Plan, all approved traffic transportation mitigation improvements must be implemented prior to issuance of a Certificate of Compliance unless otherwise provided for as part of the approved Traffic Transportation Impact Analysis Plan. b. Responsibility for Costs of Improvement; Reimbursement I. Except as provided for in provisions ii through iv below, t The costs of implementation of an approved mitigation program shall be the responsibility of the applicant, except as follows:. II. If an applicant is required to provide an improvement that would otherwise be funded by transportation impact fees, a transportation impact fee credit shall be available as provided in accordance with Sec. 16-5-116.K, Offsets to Impact Fees. III. If an applicant is required to provide an improvement which is eligible for a transportation impact fee credit as provided for in accordance with Sec. 16-5- 116.K, Offsets to Impact Fees, and the cost of the improvement exceeds the amount of the transportation impact fee otherwise calculated to be due in accordance with that section, the applicant may submit a plan for reimbursement to the Town Council for action. Such reimbursement plan shall be consistent with the Town's contractual obligations with respect to other planned street improvements and consistent with the Town's adopted Capital Improvements Program (CIP). IV. If an applicant is required to provide an improvement, other than a site-related traffic transportation improvement that is eligible for funding with transportation impact fees, or if an applicant proposes a change in priorities in the adopted CIP, the applicant may submit a proposal to the Town Council requesting consideration for inclusion of such improvement in the CIP or for a shifting of Page 28 of 58 Page 6 of 14 priorities within the CIP, together with a proposed reimbursement plan which is consistent with the requirements of this section. 10. Traffic Transportation Monitoring and Evaluation Report a. Report Annually, following the preparation of the June July intersection turning movement counts, the Official Town Engineer shall prepare a Traffic Transportation Monitoring and Evaluation Report, which shall include each of the following: I. Peak hour traffic turning movement counts for an average June July weekday for all signalized intersections as measured by the Town Engineer; II. Twenty-four hour traffic volumes on William Hilton Parkway, Palmetto Bay Road, Pope Avenue, and the Cross Island Parkway as measured by the Town Engineer; III. Historical trends over the past five years if available for items in paragraph II above; IV. Description of the operating conditions, relative to the adopted traffic service level standards, for each signalized intersection and how the operating conditions have changed since the last reporting period; V. Morning, midday, and afternoon peak hour volumes for Sea Pines Circle in reports for years evenly divisible by five two; and VI. Recommendations for mitigation improvements to intersections that fail to meet the traffic transportation standards outlined in Sec. 16-5-106, Traffic Transportation Analysis Standards. b. Certification of Traffic Transportation Data Based on the Traffic Transportation Monitoring and Evaluation Report, Traffic Transportation Impact Analysis Plans, and such other information as deemed appropriate, the Official Town Engineer shall certify the traffic transportation data to be used by all applicants, traffic transportation engineers, Town staff and consultants, in performing and reviewing Traffic Transportation Impact Analysis Plans. The Official Town Engineer will certify the traffic volume data on an annual basis or more frequently as deemed appropriate. c. Planning Commission Action I. The Traffic Transportation Monitoring and Evaluation Report prepared by the Official Town Engineer as described above shall be forwarded to the Planning Commission and simultaneously conveyed to the Town Council. Upon receipt of the Report and recommendations from the Official Town Engineer, the Planning Commission shall give notice and hold a public meeting for the purpose of discussing the Report and recommendations and eliciting public comments. II. Following its review, the Planning Commission shall forward the Traffic Transportation Monitoring and Evaluation Report and recommendations, and may forward its own supplemental report and recommendations, to the Town Council. Page 29 of 58 Page 7 of 14 11. Vehicular Multimodal Access Analysis a. All development shall have an access analysis undertaken by the Official Town Engineer. This analysis shall be undertaken to ensure that vehicular and multi- modal access to all proposed developments and subdivisions is accomplished in a safe manner. b. This analysis will identify any vehicular access improvements the applicant must install at the applicant's expense, such as deceleration lanes, and shall identify the location of any curb cuts based on, but not limited to sight distances, existing roadway infrastructure, opposing driveways locations, and shared vehicular access. This analysis will address requirements for adequate driveway design including, but not limited to turning radius and stacking distance. The standards in the South Carolina Department of Transportation's Access and Roadside Management Standards Manual shall serve as a guide for this review. c. This analysis will identify any improvements required to serve non-vehicular site access, including any modifications to or improvements of pathway crossings being impacted by the site development. d. The vehicular and multimodal access requirements approved by the Official Town Engineer shall be incorporated on development or subdivision plans prior to their approval. If an applicant is required to provide site-related traffic improvements, the cost of implementing such improvements shall be borne by the applicant and no such costs shall be eligible for a credit or offset from any transportation impact fees required in accordance with Sec. 16-5-116.K, Offsets to Impact Fees. Chapter 16-5: Development and Design Standards Sec.16-5-106. Traffic Transportation Analysis Standards A. Purpose The purpose of this section is to guide development in accordance with the existing and future needs of the Town in order to protect, promote and improve the public health, safety, morals, convenience, order, appearance, prosperity and general welfare of the citizens of the Town, by ensuring new development does not overburden and overly congest streets, pathways, sidewalks, and other transportation systems in the Town.'s streets. B. Intent The regulations of this section are designed and intended: 1. To ensure that the Town's adopted traffic transportation service level standards are met within the Town and to provide safety from fire, panic and other dangers, to promote the public health and general welfare, to prevent the Page 30 of 58 Page 8 of 14 overcrowding of land, to avoid undue concentration of population, and to facilitate safe and the adequate provision of street and non-motorized facilities. 2. To enable the Town Engineer or their designee to conduct an appropriate review and evaluation of the traffic multimodal transportation impacts of proposed development, to provide for the imposition of conditions in order to assure that new development does not impair the safety and the Town's ability and obligation to provide adequate adequacy of impacted street and transportation facilities to all its used by the Town’s citizens, and to prescribe necessary project-specific mitigation measures or to otherwise changes to the site design or operations, and establish the implementation timing and funding, as part of the condition traffic impact analysis plan approval. 3. To ensure that no traffic transportation impact analysis plan approvals are granted that would cause a reduction in the service level of any street facility that is currently operating in a manner that fails to satisfy the Town's adopted traffic service level standards. 4. To ensure that no traffic transportation impact analysis plan approvals are granted unless street facilities with adequate capacity to accommodate the traffic generated by the proposed development are available concurrently with the scheduled opening of the development. 5. To establish uniform procedures for the review of applications for traffic transportation impact analysis plan approval subject to the traffic transportation impact analysis plan requirements set forth herein. 6. To better coordinate the short-term growth potential of the Town with the immediately available street system capacity, taking into account exempt development and approved development that has not been built, to the extent to which these may be eligible for development plan approval without being subject to the traffic transportation impact analysis plan requirements of this section. 7. To better coordinate the long-term growth potential of the Town with an realistic assessment of street capacity which is currently and which may in the future become available, recognizing the limitations on the Town's financial resources, the constraints presented by the geography of the Island, and the need to preserve the Island's sensitive natural, historic, and environmental resources. 8. To better coordinate the type, location, amount, timing, and rate of development of proposed land uses in accordance with the Comprehensive Plan, zoning district regulations, and Official Zoning Map with the present and projected future availability of street system capacity. 9. 8. To establish and maintain a traffic monitoring system to regularly determine the volume of traffic on the Town's street system and the degree to which capacity limits ("thresholds") are being approached or exceeded. To require that Transportation Impact Analysis Plans are prepared by a licensed Page 31 of 58 Page 9 of 14 professional transportation engineer, and that the plan contents and modeling are consistent with national guidelines and practices published by the Institute of Transportation Engineers (ITE), the Transportation Research Board (TB), the Federal Highway Association (FHWA), the American Association of State Highway and Transportation Officials (ASHTO), the National Association of City Transportation Officials. 10. 9. It is not the intent of this section to deny to any person a reasonable opportunity to develop land in a beneficial manner, but rather to coordinate the type, location, amount, timing, and rate of development with the Town's reasonable ability to provide adequate public street facilities consistent with the Town's adopted traffic service level standards. To ensure that, in addition to measuring the impact on the roadway system, the transportation impact analysis plan measures the multimodal impacts, and mitigation measures, for non-motorized travel and transit. 10. To establish and maintain a traffic monitoring system to regularly determine the volume of traffic of the Town’s street system and the degree to which capacity limits (“thresholds”) are being approached or exceeded. C. Traffic Service Level Standards All required traffic transportation impact analysis plans shall, at a minimum, indicate compliance or non-compliance with the standards of this section. 1. The average total delay in seconds per vehicle for each signalized intersection does not exceed 55.0 seconds during the peak hour for an average July weekday; and 2. The volume-to-capacity (V/C) ratio for each signalized intersection does not exceed 0.90 during the peak hour for an average July weekday; and 3. The average total day on any approach to a traffic circle or roundabout the Sea Pines Circle does not exceed 150 seconds per vehicle during the peak hour for an average July weekday., and the average total delay on any approach to any other traffic circle or roundabout does not exceed 55.0 seconds per vehicle during the peak hour for an average July weekday; and 4. The Level of Service (LOS) for any vehicular traffic movement does not decline by more than one level per the requirements of the Highway Capacity Manual (HCM), nor to a Level of Service of “F”; and 5. The development causes safety issues or delays that require mitigation as determined by the Town Engineer. Page 32 of 58 Page 10 of 14 Appendix D: Application Submittal Requirements D-11. Traffic Transportation Impact Analysis Plan Review A. Plan Preparation 1. Selection of Traffic Transportation Engineering Firm The Traffic Transportation Impact Analysis Plan shall be prepared for the applicant by a qualified traffic Transportation engineer/engineering firm, selected from a list of traffic engineering firms maintained by the Town. The list shall be created through the solicitation by the Town of professional traffic engineers qualified to perform this service. The list shall contain the names of at least three traffic engineering firms. approved by the Town Engineer or their designee, and sealed by a licensed professional engineer registered in South Carolina. 2. Establishment of Traffic Transportation Impact Plan Parameters a. Prior to beginning the Traffic Transportation Impact Analysis Plan, the applicant shall supply the Official Town Engineer with the following: I. A written narrative describing the proposed land use(s), size and projected opening date of the project and any phases. The narrative must also identify the Beaufort County Tax Map and parcel numbers to be occupied by the proposed development; II. A site location map; and III. A proposed site plan showing the location of the proposed development on the site and vehicular access to public or private streets or any other development. IV. A study area map or maps that illustrate the intersections to be evaluated in the study, along with the relevant pedestrian and non- motorized pathway systems. The non-motorized map shall generally depict expected walking and bicycling patterns (origan and destinations), where people will cross roadways, and improvements needed. Public transportation systems shall be included in this study area map as well. V. For uses, as determined by the Town Engineer or their designee, a review of the transit or other mobility options, and how they can be accommodated on or near the site. Page 33 of 58 Page 11 of 14 b. Based on this information, along with the ITE Trip Generation Manual and available information on land use, travel patterns and traffic conditions, the Official Town Engineer will supply in writing to the applicant or the applicant's selected engineering firm the parameters to be followed in the study, including the study area for all modes, directional split of driveway traffic, trip distribution to multiple access points, trip distribution on the study area roadway network background traffic growth rate, previously approved or proposed projects that are but not completed projects, and the intersections to be analyzed along with any associated turning movement counts and signal timing data that which are available. B. Submittal Requirements An acceptable traffic transportation impact analysis plan shall include an accurate representation of the following elements: 1. A current site plan or subdivision plat identifying access to and from existing or proposed streets and intersections. In addition, a vicinity map shall be provided. 2. Description of the proposed development, including the type of proposed land use, the number of residential units by type, the number of existing and proposed lots, the type of proposed non-residential development and the amount of such development measured by gross floor area or other appropriate unit of measure, the general size and type of accessory development or facilities, and, for non-residential development, adequate information to identify the appropriate land use category or categories for trip generation. 3. Traffic, pedestrian, and bicycle counts must be collected and analyzed if the existing data is more than two years old or is determined to be unavailable by Town Engineer. The existing conditions shall consider and include any development in the study area that has generated a previous application for a TIAP study or other development in the study area that is projected to occur within five (5) years from the TIAP study as determined by the Town Engineer. Projected vehicular trips to and from the completed development, or any interim development phases, on the adjacent street during the a.m. and p.m. peak hours of the surrounding roadway network. In some cases the Town Engineer may also require an analysis of Saturday conditions or the peak hours of the proposed land-use. The percentage of passerby pass-by trips, if used in the plan, shall be included, as well as the source of this information. The trips shall be presented as “Multi-Modal Trips” with a listing of pass-by trips, internal trips (within the development), pedestrian, bicycle, transit, ride- hailing, or other trips. In cases where multi-use pathway segments or pathway crossings are being impacted by the development, the Town Engineer shall also require analysis of projected levels-of-service. Page 34 of 58 Page 12 of 14 4. A written narrative setting forth the assumptions upon which any projection, made in developing the traffic transportation impact analysis plan required under this part, is based upon. If the assumptions are derived from the ITE manual, the materials excerpts shall be identified. If the assumptions are not from the ITE manual, appropriate excerpts will the referenced materials shall be included in the study and the reasoning underlying the assumptions shall be stated in the narrative. If the project predicts fewer auto trips due to various travel demand management measures, assurances that those measures will be applied and are enforceable will be determined by the Town Engineer. 5. The traffic Transportation Impact Analysis Plan study shall be based on intersection analysis procedures for signalized intersections and roundabouts or traffic circles as identified in the Transportation Research Board's (TRB) current Highway Capacity Manual Special Report 209 and utilize computer software which emulates these procedures and is acceptable to the Official Town Engineer. Any analysis involving a traffic circle will utilize computer software which is designed to analyze traffic circles and is acceptable to the Official. The results of any required computer analysis shall, at a minimum, indicate compliance or non-compliance with the traffic transportation standards of Sec. 16-5-106, Traffic Transportation Analysis Standards. 6. Safety data in the study area, when required by the Town Engineer, shall include the types of collisions. The study should describe how safety will be influenced by the project’s transportation impacts and evaluate potential solutions. Potential mitigation measures shall be consistent with the American Association of State Highway and Transportation Officials AASAHTO Highway Safety Manual, Federal Highways Administration (FHWA) guides on non- motorized crossings, and other national research. 7. The impact on non-motorized travel shall be based on the procedures and practices recommended by ITE, Transportation Research Board (TRB), AASHTO and FHWA. The applicant shall incorporate where possible any non- motorized recommendations included in Town and/or regional long-term plans in the vicinity of the site. The study should identify potential changes such as: a. Improvements to pedestrian crossings; b. Additional pedestrian or bicycle crossings; c. Improvements to pedestrian signals, pedestrian signal intervals, signs, and pavement markings; d. Construction of additional sidewalks or non-motorized pathways; e. Changes to the site design and access to ease non-motorized travel and reduce conflicts with vehicles, from the public right-of-way to the building entrances or on-site activity; and f. Other similar improvements to transportation facilities. Page 35 of 58 Page 13 of 14 6.8. The intersections which must be analyzed in the study are identified as: a. Any signalized intersection that serves as a development's point of access to a major arterial. This will include intersections of public and private roads with major arterials, and driveways offering direct access to a major arterial; and b. The first signalized intersection on either side of the development's primary point of access to a major arterial; and c. Other signalized intersections on major arterials if within 1 road mile of the development's primary point of access to a major arterial and when in the opinion of the Official Town Engineer there is a potential for a significant impact to the intersection's level of service from site related site-related traffic; and d. Any traffic circle or roundabout, when in the opinion of the Official Town Engineer, there is a potential for a significant impact to the circle's level of service from site related traffic. 7.9. At a minimum, the plan must include the results of a computerized analysis projecting the operating conditions of critical intersections relative to signalized intersections and roundabouts or traffic circles identified in 8. above. The intersections shall meet the Town's adopted traffic service level standards outlined in 16-5-106. All other intersections must be projected to operate at levels of service acceptable to the Town Engineer. The analysis shall reflect the projected condition of these intersections and movements based on the full operation and/or build-out of the development date of the development and, where applicable, on other significant phase-in dates of the development project. 8.10. If the initial computerized analysis indicates that the Town's adopted traffic service level standards will be not be met, a mitigation plan must be included in the plan based on at least one additional computer analysis. This mitigation plan must show how the Town's adopted traffic service level standards will be satisfied. Applicants will only shall be responsible to mitigate the traffic transportation impacts. of their proposed development. Acceptable roadway mitigation measures are limited to the following: a. Traffic signal timing adjustments; timing or phasing revisions, that not only mitigate traffic impacts generated by this development, but also result in safe and acceptable operations at the study intersection as demonstrated by a network traffic analysis; b. Traffic signal phasing adjustments; Addition of signs, signals, markings, or other measures to accommodate road crossings and improve safety for pedestrians and achieve ADA compliance; c. Pavement marking revisions; Page 36 of 58 Page 14 of 14 d. Adding additional intersection turn lanes not to exceed 4 lanes on minor arterial approaches and 5 lanes on major arterial approaches; and e. Geometric improvements to traffic circles or roundabouts signalized or unsignalized intersections, including traffic circles or roundabouts, to improve traffic operations, pedestrian and bicycle operations or to improve safety; f. Road widening; g. Adding a traffic signal at a location that is warranted per the Manual of Uniform Traffic Control (MUTCD); h. Replacing a traffic signal or uncontrolled intersection with a roundabout that meets the Town’s operational and design standards; i. Changes to locations or design of median crossovers to reduce congestion and mitigate accidents; j. Removal of changes to the number and location, or design of access points to reduce congestion and mitigate accidents; k. Additional signage; l. Other transportation-related safety improvements identified and/or recommended by the Town Engineer. Page 37 of 58 TOWN OF HILTON HEAD ISLAND COMMUNITY DEVELOPMENT DEPARTMENT One Town Center Court, Hilton Head Island, SC 29928 843-341-4757 FAX 843-842-8908 STAFF REPORT PUBLIC PROJECT REVIEW Case# Pro· ect Name Public Hearin Date PPR-000829-2025 Patterson Famil Park Se tember 17, 2025 Project Location Applicant 23 Marshland Road Scott Harris Hilton Head Island, SC 29926 Town of Hilton Head Island 1 Town Center Court Parcels: RS 10 008 000 008D 0000 & Hilton Head Island, SC 29928 RS 10 008 000 0460 0000 Application Summary PPR-000829-2025- Public Hearing Request from Scott Harris, with the Town of Hilton Head Island, for the Public Project Review for a new park facility on the Town-owned parcel located at 23 Marshland Road. The affected parcel is Beaufort County Tax Map Parcel RS 10 008 000 008D 0000 Staff Recommendation Staff recommends the Planning Commission find this application to be consistent with the Town's Comprehensive Plan (Our Plan) for location, character, and extent based on those Findings of Fact and Conclusions of Law as determined by the LMO Official and enclosed herein. Back1:?;round Parks and Recreation is one of the Major Core Values under the Town's Our Plan. Under the Parks and Recreation Core Value, there are 8 Major Goals, one of them being to provide best-in-class recreation facilities and programs in the Island's public parks, and another being to promote multi­ dimensional inclusion and access for all parks, facilities, and recreation programming. Patterson Family Park is anticipated to have a blend of family oriented use by the public on a daily basis, particularly at the play features, providing paved handicapped parking, a sidewalk, and fixed toilet facilities with running water will contribute to the Town's Comprehensive Plan goals of providing best-in-class parks and recreation facilities, and accessible facilities and routes at the Town's parks. Descri tion of Pro·ect The proposed park will feature pedestrian pathways and crosswalks, vehicular access and parking, and internal interpretive signage. It will also include passive open lawn spaces, a playground and a covered avilion e ui ed with restrooms, tables, ·us, and seatin areas. Pathwa sw ill be scattered 1 Page 38 of 58 Page 39 of 58 Page 40 of 58 Page 41 of 58 Attachment A - Location Page 42 of 58 Page 43 of 58 23 PROMENADE STREET, SUITE 201 BLUFFTON, SC 29910 OFFICE: (843) 757.7411 PUBLIC PROJECT REVIEW NARRATIVE Patterson Family Park Parcel Number: R510 008 000 008D 0000 The Town of Hilton Head Island is proposing the development of a new park on a Town owned parcel located at 23 Marshland Rd. Currently the property is undeveloped wooded lot. Creation of this park is consistent with Hilton Head Island’s 2020 to 2040 Comprehensive Plan to develop the Patterson Tract as a mini park. The vision for this project is to provide a neighborhood park that tells the story of this land, nestled within the Marshland Historic Gullah Neighborhood. Woven into that story is a commitment to honor the community’s voice—incorporating the features they asked for during neighborhood meetings. These include a multi-purpose lawn, playground, a pavilion with restrooms, oyster roasting / grilling area, observation area overlooking Broad Creek, and walking paths. Guided by the site analysis, each element has been thoughtfully placed to complement and the site’s existing composition: specimen live oaks, broad creek views, and integration with Beautiful Island Square and adjacent residences. Page 44 of 58 Page 45 of 58 Stephen G. Riley Municipal Complex One Town Center Court  Hilton Head Island  South Carolina  29928 www.hiltonheadislandsc.gov TO: FROM: VIA: CC: DATE: SUBJECT: Planning Commission Michael Connolly, Senior Planner Trey Lowe, Development Services Program Manager Shawn Leininger, Deputy Town Manager, Interim LMO Official September 17, 2025 Axis Engineering Consultants is proposing the development of an Aldi grocery store at Sea Turtle Marketplace. The subject property is located at 80 Mathews Drive, is zoned CC (Community Commercial), is within the Airport and Corridor Overlays and has the Property Identification Number of R511 008 000 0156 0000. Town Staff continuously looks for ways to improve its processes. One recent change implemented by Staff for the Development Review Program is to require all Major Development Plan Review applications for new commercial development and Major Subdivision applications to be shared with the Planning Commission. The applications will be presented by Staff for information purposes only. This will provide a way for the Planning Commission and the general public to be made aware of all new developments being proposed on Hilton Head Island. There is one new Major Development Plan Review application ready to be shared with the Planning Commission – DPR-001043-2025 – Aldi Grocery Store. Axis Engineering Consultants is proposing the development of an Aldi grocery store at Sea Turtle Marketplace. The subject property is located at 80 Mathews Drive, is zoned CC (Community Commercial), is within the Airport and Corridor Overlays and has the Property Identification Number of R511 008 000 0156 0000. Attachments: A. DPR-001043-2025 - Site Plan B. DPR-001043-2025 - Narrative TOWN OF HILTON HEAD ISLAND Staff Report Memo Page 46 of 58 MATHEWS DRIVE - PUBLIC R/WVARIES N/F MATTHEWS COURT LLC N/F GG REIF I SEA TURTLE LLC (PARCEL-C) N/F GG REIF I SEA TURTLE LLC (PARCEL-D) N/F DRAYTON-PARKERCOMPANIES LLC (PARCEL-E) N/F GG REIF I SEA TURTLE LLC (PARCEL-C) VERSION 7.0 PROTOTYPE (RIGHT HAND ENTRY, SIDE DOCK) ±21,867 SF INCLUDING CANOPY CANOPY SF: ±1,181 BUILDING SF: ±20,686 FFE: 15.20 11 8 8 2 2 7 6 61 2 3 4 CURBSIDE CURBSIDE CURBSIDE CURBSIDE 20' BUILDING SETBACK 20' BUILDING SETBACK 50' BUILDING SETBACK 50' BUILDING SETBACK 7 1' 10' 9' 10' 18' 12' R6' R3' R6' R6' R6' R3' R3' 5' 8'8'8'8'5'8'9' 20' 9' 9' 18' 9'18' 10' 10' 10' 10' 10' 10' 10' 10' 10'10' 30'18'24' 18' 10' R100' R15' R50' R67' R12' R15' R130' R5' R5' R5' R5' 8' 24' 30' R15' R15' R15' R5' 10' 8.5' 8.5' 10' 5' R15' R15' 4' 30' 4' 6' R15' 24' R400' R300' 5' 8' R2'R2' 5' 5' 10' R20' R20' 24' 76' 49.33' 24.67' 1 1 1 1 1 1 1 2 2 2 3 3 3 4 4 5 5 6 6 8 9 10 10 11 11 11 7 13 14 15 16 16 16 17 18 18 20 20 22 22 18 2 11 11 2 18 1 3 11 5 5 12 1 5 22 4 8 21 21 22 19 19 19 19 12 23 24 25 26 27 22 6 6 5' R3' 28 15' R11' R5' R5'R3' R5' 22 11 11 6 1 1 R11' R11' R15' R15'R5' 3' R3.5'R5' R5' 9'10' 10' R5' R15' 10' R35' R15' R8' R3' 15' 10' 27 29 R53' 9' 10' R5' R5' 2.5' 10 10 10 10 10 ALL PROPOSED SIDEWALK TO MATCH EXISTING SHELL TEXTURE SEEN THROUGHOUT EXISTING SEA TURTLE MARKETPLACE 10' 10' 30 SHEET OF 9 10 8 7 6 5 4 3 2 DATE NO.DESCRIPTION REVISIONS DATE OF PLANS 1 AEC PROJECT NUMBER Z:\Shared\AEC\Projects\2025\25-25029 ALDI - W. H. Pkwy Hilton Head Island, SC\DWG\61153C_B01.dwg - 7/21/2025 3:25 PM C4.0 31 ALDI AT HILTON HEAD ISLAND ALDI, INC. SITE PLAN 2/11/2025 REV PER TOWN OF HILTON HEAD REV PER TOWN OF HILTON HEAD REV PER TOWN OF HILTON HEAD - - - - - - - 4/25/2025 7/21/2025 - - - - - - - 7/19/2024 25-25029 HILTON HEAD ISLAND, BEAUFORT COUNTY, SOUTH CAROLINA PARKING CALCULATIONS: REQUIRED MINIMUM PARKING STALLS: ONE STALL PER 200 SF GFA 20,644 SF / 200 SF * 1 STALL = 103.2 STALLS - 2 STALLS (REDUCED BY ONE STALL PER 10 BICYCLE STALLS) = 101.2 STALLS 101 STALLS REQUIRED REQUIRED MINIMUM ELECTRICAL VEHICLE (EV) CHARGING STATIONS ONE STATION PER SITE REQUIRED MINIMUM BICYCLE STALLS 2 BICYCLE STALLS PER EVERY 10 VEHICLE STALLS 101 STALLS / 10 * 2 STALLS = 20.2 STALLS 20 STALLS REQUIRED PROVIDED PARKING STALLS: 46 STANDARD STALLS, 2 EV STALLS, 4 CURBSIDE PICK-UP STALLS, 5 HANDICAP STALLS, AND 44 EXISTING SHARED STALLS 101 STALLS TOTAL PROVIDED ELECTRICAL VEHICLE (EV) CHARGING STATIONS 2 EV STALLS TOTAL PROVIDED BICYCLE STALLS 4 BICYCLE RACKS; EACH WITH 5 STALLS 20 STALLS TOTAL GENERAL SITE NOTES: 1. HANDICAPPED PARKING AND ACCESSIBLE ROUTES SHALL MEET THE AMERICANS WITH DISABILITIES ACTS STANDARDS FOR ACCESSIBLE DESIGN - LATEST EDITION. SIDEWALKS SHALL NOT EXCEED 5% MAXIMUM LONGITUDINAL SLOPE AND 2% MAXIMUM CROSS SLOPE. ACCESSIBLE PARKING STALLS SHALL NOT EXCEED 2% MAXIMUM SLOPE IN ALL DIRECTIONS. ACCESSIBLE RAMPS SHALL NOT EXCEED 12H:1V GRADE. 2. ALL SIGNS AND STRIPING SHALL CONFIRM TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) - LATEST EDITION AND/OR DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS. 3. ALL DIMENSIONS ARE MEASURED TO THE FACE OF CURB (WHEN PRESENT), EDGE OF ASPHALT AND/OR EDGE OF BUILDING. 4. HORIZONTAL DATA SHOWN HEREON IS BASED ON NAD83 SOUTH CAROLINA STATE PLANES, US FOOT. VERTICAL DATA SHOWN HEREON IS BASED ON NAVD 88(12B). SITE INFORMATION PROJECT ADDRESS80 MATTHEWS DRIVE, HILTON HEAD ISLAND, SOUTH CAROLINA 29926 PARCEL NUMBERR511 008 000 0156 0000 (2.81 AC) PARCEL ZONINGCC (COMMUNITY COMMERCIAL) PROJECT AREA±2.81 ACRES BUILDING SETBACKLANDSCAPE SETBACK FRONT50'FRONTN/A SIDE20'SIDEN/A REAR20'REARN/A 0' GRAPHIC SCALE 1" = 30' 15'30' 30' R Call 811 Before you Dig HATCH LEGEND: STANDARD DUTY ASPHALT PAVEMENT CONCRETE SIDEWALK (MATCH EXISTING DEVELOPMENT) HEAVY DUTY ASPHALT PAVEMENT HEAVY DUTY CONCRETE PAVEMENT KEY NOTES: 18" CURB & GUTTER 24" WHITE STOP BAR; PAINT 4" WHITE PARKING STALL STRIPING; PAINT 5" BLUE HANDICAP STALL/LOADING AREA STRIPING; PAINT HANDICAP / VAN ACCESSIBLE SIGN (R7-8 & R7-8P); MOUNTED ON WALL 36" STOP SIGN (R1-1) 12" CONCRETE RIBBON CURB (EDGE RESTRAINT) 6" YELLOW TRAFFIC STRIPING - 18" OC @ 45°; PAINT CART WALL (SEE ARCHITECTURAL / STRUCTURAL PLANS) 5" DOUBLE YELLOW CENTERLINE STRIPING; PAINT PAVEMENT MARKING - STRAIGHT ARROW (SCDOT STD); PAINT 6' RAMP WITH MAX 12:1 SLOPE CART STORAGE (SEE ARCHITECTURAL PLANS) CONCRETE WHEEL STOP (ALL PARKING SPOTS ALONG BUILDING) DUMPSTER GATE (SEE ARCHITECTURAL PLANS) 10" CONCRETE BOLLARD (SEE ARCHITECTURAL / STRUCTURAL PLANS) 3" STEEL PIPE POST (SEE ARCHITECTURAL / STRUCTURAL PLANS) PIPE GUARDRAIL AND HANDRAIL (SEE ARCHITECTURAL PLANS) UNDERGROUND DETENTION BED LIMITS LOADING DOCK WALL (SEE ARCHITECTURAL / STRUCTURAL PLANS) BICYCLE RACK (MINIMUM 5 BICYCLES PER RACK) TACTILE PAVING (2' MIN) 3' TALL MODULAR RETAINING WALL (±75 LF); SEE DETAIL SHEET ELECTRICAL VEHICLE (EV) PARKING STALL WITH CHARGING STATION 12" x 30" CURBSIDE PICK-UP PARKING SIGN (SEE DETAIL SHEET) CURBSIDE PICK-UP PARKING PAVEMENT MARKINGS (60" WHITE NUMBERS AND 24" BLUE STRIP WITH 12" LETTERS; SEE DETAIL SHEET) 2' CURB TAPER 1 2 3 4 5 6 7 8 PERVIOUS PAVERS (MATCH EXISTING) 9 10 11 12 13 14 15 16 17 18 EXISTING CONCRETE EXISTING ASPHALT PAVEMENT 19 20 21 22 EXISTING DIRT ROAD EXISTING GRAVEL EXISTING BRICK PAVERS WETLAND AREA PRE-DEVELOPEDPOST-DEVELOPED TOTAL AREA 2.81 AC100%TOTAL AREA 2.81 AC100% IMPERVIOUS 0.09 AC 3.2% IMPERVIOUS 1.66 AC 59.0% PERVIOUS 2.72 AC 96.8% PERVIOUS 1.15 AC 41.0% 23 24 25 26 27 N CONCRETE TRANSFORMER PAD (SEE MEP PLANS)28 No. 7594 SOUTH CAROLINA CERTIFICATE OF AUTHORIZATION AXIS ENGINEERING CONSULTANTS No. 33627 SOUTH CAROLINA LICENSED PROFESSIONAL ENGINEER BRAIN HILL BRAUN 296" HEADER CURB 30RAISED WALKING PLATFORM (SEE LANDSCAPE PLAN) ________________________ Page 47 of 58 Advanced Engineering Services, LLC. • Phone: 800-416-8136 OFFICES IN: Albany, GA • Valdosta, GA • Warner Robins, GA • Tal lahassee, FL February 13, 2025 Town of Hilton Head Community Development Department 1 Town Center Court Hilton Head Island, SC 29928 CDIC@hiltonheadislandsc.gov RE: ALDI, Inc. – Sea Turtle Marketplace P arcel # R511 008 000 016 0000 – Intersection of US HWY 278 & Mathews Drive Hilton Head, Beaufort County, South Carolina Dear Town of Hilton Head, We are proposing the construction of an ALDI, Inc. store at the Sea Turtle Marketplace, located off William Hilton Parkway (US HWY 278). This project includes the development of a 20,664 square-foot commercial building, new utility infrastructure, parking lot installation, pedestrian access, a Stormwater Management Plan, and landscaping. The site is situated within the Airport Overlay District, near the edge of the Runway Protection Zone, Zone A. To ensure compliance, we engaged the Federal Aviation Administration (FAA) for a report and investigation regarding the feasibility of construction in this area, and we also consulted with local airport director Jon Rembold. Based on the local airport review, we meet all requirements, with the exception of the Land Use portion under the CLUE tool analysis. While we understand the position of the local airport review, the Greenberg Gibbons team and ALDI are aware that the Town code does not consider this review as final, as it is just one aspect of the overall approval process. Additionally, we have received FAA confirmation that the project poses no hazard to air navigation. The FAA's determination letter is included in the submittal documents for your review. If you have any questions, please contact our office at 1-800-416-8136 or via email at aespermit@aesllc.us. Sincerely, Advanced Engineering Services, LLC B. Matthew Inman, PE Associate Vice President Page 48 of 58 Stephen G. Riley Municipal Complex One Town Center Court  Hilton Head Island  South Carolina  29928 www.hiltonheadislandsc.gov TO: Planning Commission FROM: VIA: Michael Connolly, Senior Planner Trey Lowe, Development Services Program Manager CC: Shawn Leininger, Deputy Town Manager, Interim LMO Official DATE: September 17, 2025 SUBJECT: Casey Warfield of Kimley Horn, is proposing the redevelopment of a grocery store at 70 Pope Ave. The subject properties are zoned Coligny Resort (CR) District and are located within the Corridor Overlay. The subject parcels are identified on Beaufort County Tax Map 18 as R553 018 000 0268 0000 and R553 018 000 0269 0000. Town Staff continuously looks for ways to improve its processes. One recent change implemented by Staff for the Development Review Program is to require all Major Development Plan Review applications for new commercial development and Major Subdivision applications to be shared with the Planning Commission. The applications will be presented by Staff for information purposes only. This will provide a way for the Planning Commission and the general public to be made aware of all new developments being proposed on Hilton Head Island. There is one new Major Development Plan Review application ready to be shared with the Planning Commission – DPR-000104-2025 - 70 Pope Ave., a redevelopment of a grocery store. The subject properties are zoned CR District and are located within the Corridor Overlay, and are identified on Beaufort County Tax Map 18 as R553 018 000 0268 0000 and R553 018 000 0269 0000. Attachments: A. DPR-000104-2025 - Site Plan B. DPR-000104-2025 - Narrative TOWN OF HILTON HEAD ISLAND Staff Report Memo Page 49 of 58 UGTUGTUGTGAS X XXX VAN VAN VAN 110' PROPOSED BUILDING±47,000 SFFFE: 13.1' PROPOSED RETAIL±1,500 SF 13121110090806 04B04A 02B02A01 VAN TRASHCOMPACTOR PROPOSEDPATIO±2,000 SF PROPOSEDPATIO±600 SF EVEV COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT70' 24' FULL ACCESSENTRANCE/EXITROADWAY EASEMENT PERDEED BOOK 4184, PAGE 247 EXISTING MONUMENT SIGN EXISTINGMONUMENTSIGN20' BUILDING SETBACK 20' BUILDING SETBACK 20' BUILDING SETBACK20' BUILDING SETBACK FLOOD ZONEAE LIMITSFLOOD ZONEAE LIMITS FLOOD ZONEX LIMITS FLOOD ZONEX LIMITS 50' 30' BUILDING SETBACK POPE AVE 100'R/W OGTCW SHEET NUMBERPROJECT NO.SCALE:DRAWN BY:DESIGNED BY:CHECKED BY:PROJECT:TITLE: No. DATEBY DATE Drawing name: K:\CHA_LDEV\019842 Brixmor\004 - Circle Center HHI\02 - DWG\PlanSheets\C2-00 - SITE PLAN.dwg C2-00 SITE PLAN Aug 12, 2025 11:39am by: Olivia.TiceThis document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. © 2025 KIMLEY-HORN AND ASSOCIATES, INC.1080 MORRISON DRIVE, SUITE 240CHARLESTON, SOUTH CAROLINA 29403PHONE (843) 737-6390WWW.KIMLEY-HORN.COMAS SHOWNCLIENT: CERTIFICATE OF AUTHORIZATIONANDNo. C00166INCKIMLEY-HORNASSOCIATES,TUSONILAHCROAOGT REVISIONS0ISSUED FOR DPR REVIEW01/23/2025KHA1REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA2REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA3 04/30/202507/08/2025BRE RETAIL RESIDUAL CIRCLECENTER OWNERS LLC1003 HOLCOMB WOODS PARKWAY,ROSWELL, GA 30076PHONE: (770) 360-8429CIRCLE CENTER HHIREDEVELOPMENT70 POPE AVENUE, HILTON HEAD ISLAND, SC 29928 01984200401/23/2025 REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA08/12/2025 C2-00SITE PLAN - OVERALLNORTHSEE SHEET C2-01SEE SHEET C2-02 DEVELOPMENT SUMMARY:SITE SUMMARY:ZONING:CR (COLIGNY RESORT)OVERLAY ZONING DISTRICT:COR (CORRIDOR OVERLAY DISTRICT)LAND USE:SHOPPING CENTERFLOOD ZONES:X, X-SHADED, AEMAX DENSITY: N/AGROSS SITE AREA: 7.48 ACRESNET SITE AREA:7.48ACRESMAX IMPERVIOUS COVER: N/ACURRENT IMPERVIOUS AREA:5.77ACRESPROPOSED IMPERVIOUS AREA:5.54 ACRES (74%)PERVIOUS AREA:1.94 ACRES (26%)TOTAL DISTURBED AREA:4.5 ACRESBUILDING SETBACK*:FRONT:30 FTSIDE (NASSAU ST):20 FTSIDE (NORTH):20 FTBACK:20 FTMAX BUILDING HEIGHT:36 FT ALONG ADJACENT STREET SETBACK, 60 FT ONCE SETBACK ANGLE ATTAINEDPROPOSED BUILDING HEIGHT: 30'-8"*THE 30' SETBACK ALONG POPE AVE IS SHOWN, BUT IS NOT APPLICABLE DUE TOPARCEL SHAPE. THE 20' SETBACK ALONG NASSAU STREET IS SHOWN, BUT IS NOTAPPLICABLE DUE TO NASSAU STREET BEING WITHIN A ROADWAY EASEMENT.PROPOSED LAND USES & DENSITIES:EXISTING GROCERY STORE:44,993 SFPROPOSED GROCERY STORE:47,000 SFPROPOSED RETAIL:1,500 SFEXISTING SHOPPING CENTER TO REMAIN:20,500 SFTOTAL:69,000 SFPARKING SUMMARY:EXISTING PARKING TOTAL:259 SPACES (TOTAL)STANDARD (9'X18')173 SPACESCOMPACT78 SPACESPERVIOUS0 SPACESADA8 SPACESREQUIRED PARKING RATIO PER HHI:SHOPPING CENTER (1 SPACE/500 GFA):44 SPACESGROCERY STORE (1 SPACE/250 SF):188 SPACESTOTAL REQUIRED PARKING232 SPACESMAXIMUM ALLOWABLE PARKING (105%)244 SPACESPROPOSED PARKING TOTAL:251 SPACES (TOTAL)STANDARD (9.5' X 18')74 SPACESPERVIOUS (9.5' X 18')133 SPACESPERVIOUS COMPACT28 SPACESPERVIOUS ELECTRIC VEHICLE CHARGING2 SPACESADA10 SPACESVAN ADA4 SPACESBICYCLE PARKING SUMMARY:EXISTING BICYCLE PARKING:18 SPACES (TOTAL)REQUIRED BICYCLE PARKING:61 SPACES (TOTAL)PROPOSED BICYCLE PARKING:32 SPACES (TOTAL)**SUBSTITUTION OF NONCONFORMITIES (SUBNC-000139-2025) APPROVED ONFEBRUARY 12, 2025SITE NOTES:1.THE PROPOSED BUILDING INFORMATION SHOWN HEREON IS FROM ANELECTRONIC FILE PROVIDED BY HISCUTT & ASSOCIATES ARCHITECTURE,DATED 08/01/2024 AND IS FOR ILLUSTRATIVE PURPOSES ONLY. CONTRACTORSHALL REFERENCE ARCHITECTURAL PLANS FOR EXACT BUILDINGINFORMATION.2.EXISTING CONDITIONS SHOWN HEREON ARE FROM A SURVEY FILE PROVIDEDBY NANDINA INC. d.b.a. SEA ISLAND LAND SURVEY, INC., DATED 05/08/2024.3.ALL DIMENSIONS ARE FROM FACE OF CURB TO FACE OF CURB UNLESSOTHERWISE NOTED.4.SIDEWALK INSTALLED AGAINST BACK OF CURB SHALL BE INSTALLED PER THEPLAN AS MEASURED FROM THE BACK OF CURB.5.ALL SIGNAGE AND STRIPING MUST MEET THE LATEST REQUIREMENTS SETFORTH BY MUTCD, SCDOT, AND SOUTH CAROLINA STATE CODE.6.REFERENCE LANDSCAPE PLANS FOR ALL HARDSCAPE AND LANDSCAPEDETAILS AND SPECIFICATIONS.7.EV STALLS PROVIDED ARE TO BE ADA COMPLIANT AND SHOULD HAVE SIGNSTATING THEY ARE FOR ACTIVE EV CHARGING ONLY.8.PROPOSED LOCATION OF STORAGE TANK(S) AT THE SUBJECT SITE ARE NOTWITHIN 500 FEET OF ANY EXISTING COMMUNITY WATER SUPPLY WELL, NOTWITHIN 500 FEET OF ANY NON-TRANSIENT, NON-COMMUNITY WATER SUPPLYWELL, AND NOT WITHIN 100 FEET OF ANY OTHER EXISTING POTABLE WATERSUPPLY WELL.9.PAINT STRIPING IN ALL PARKING LOT AND PAVEMENT AREAS SHOULD BECONSTRUCTED WITH A PAINT PRODUCT THAT PROVIDES A HIGHSLIP-RESISTANT FINISH AND PREVENTS INDIVIDUALS FROM SLIPPING WHENSTEPPING ON THE STRIPING IN BOTH WET AND DRY CONDITIONS.10.TEMPORARY WORK ZONE TRAFFIC CONTROL DEVICES EMPLOYED ARE TO BECOMPLIANT WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. 3 3 3 3 Page 50 of 58 UGTUGTUGTUGTUGTUGT UGTGASGASGASGAS XX XXXXXXXX VANVAN VAN 110' PROPOSED BUILDING±47,000 SFFFE: 13.1'PROPOSEDRETAIL±1,500 SF VAN TRASHCOMPACTOR XX PROPOSEDPATIO±2,000 SF EVEV 5' SIDEWALK FLUSH WITHBACK OF EXISTING CURB TYP. TYP. TYP.TYP. TYP. TYP.TYP. TYP.I EEEEE AA DC A A GA H A AA J B B BB B KK L L BMO O G GP K QTYP. CONCRETEFLUME N R S MAILBOXES TO BERELOCATED TOBUILDING FACE UCONTRACTOR SHALLTIE INTO EXISTINGSIDEWALK T TV W W 5'X5' TREEWELL, TYP. OF 2I SIDEWALK TO HAVETURN DOWN EDGEWITH HANDRAIL QTYP. T T CONTRACTOR SHALL RESET/RESTRIPE MULTIUSEPATH TO RELOCATE STOP BAR, STOP SIGN,CONCRETE PAD, AND DETECTABLE WARNING TOTHE REVISED CURB LINE LOCATION X X I RAMP, REFERENCEARCHITECTURAL DRAWINGSY F S SS S SS S S S CURB ALONG FRONTSIDEWALK TO BE PAINTEDTRAFFIC YELLOW (TYP.)CURB ALONG FRONTSIDEWALK TO BE PAINTEDTRAFFIC YELLOW (TYP.) TYP.B TYP.B BTYP. BTYP. AA AATYP. TYP. TYP. BB BTYP.CC CC PROPOSED 5'SIDEWALKPTYP. DD DD DD EE L FFFFFF R3'R50'R3'R5' R3'R3'R3'R3'R3' R3'R3'R3'R3'R3'R3' R1.25'R1.25' R3'R5'R10'R3' R34' R2.5'R2.5'R3'R3'R3'R3'R1.25'R1.25'R3'R3'R1.25' R3' R3' R3' R10'R5' R1.25' R3'R3'R3' R1.25' R3'R3' R50'R15' R5'R3' R1.25'R1.25'R1.25' R5'R3'R3'R5'R3' R3' R5' 9.5'20.41' 5'12'5'12'9.5'9.5'18' 9.5'18'12'12' 3'18'9.5'9.5' 12'12'12'5'12'12'5' 18'9.5' 9.5' 5'12' 18'9.5'9.5'18' 24'18' 5'12'5' 24'18'18'24'18'18'24'18' 18'18'24'18'9.5' 24' 20' BUILDING SETBACK 24' 12' 5' 24'70' 28'80' GGGG 121056412 109210 63 43 7 4 139 PROPOSED ADA RAMP WITHDETECTABLE WARNING TOMATCH EXISTINGSTREETSCAPE, REFERENCESCDOT STANDARDDRAWING 720-951-11 CC CC CCCCCCCC CC OGTCW SHEET NUMBERPROJECT NO.SCALE:DRAWN BY:DESIGNED BY:CHECKED BY:PROJECT:TITLE: No. DATEBY DATE Drawing name: K:\CHA_LDEV\019842 Brixmor\004 - Circle Center HHI\02 - DWG\PlanSheets\C2-00 - SITE PLAN.dwg C2-01 SITE PLAN - WEST Aug 12, 2025 11:39am by: Olivia.TiceThis document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. © 2025 KIMLEY-HORN AND ASSOCIATES, INC.1080 MORRISON DRIVE, SUITE 240CHARLESTON, SOUTH CAROLINA 29403PHONE (843) 737-6390WWW.KIMLEY-HORN.COMAS SHOWNCLIENT: CERTIFICATE OF AUTHORIZATIONANDNo. C00166INCKIMLEY-HORNASSOCIATES,TUSONILAHCROAOGT REVISIONS0ISSUED FOR DPR REVIEW01/23/2025KHA1REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA2REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA3 04/30/202507/08/2025BRE RETAIL RESIDUAL CIRCLECENTER OWNERS LLC1003 HOLCOMB WOODS PARKWAY,ROSWELL, GA 30076PHONE: (770) 360-8429CIRCLE CENTER HHIREDEVELOPMENT70 POPE AVENUE, HILTON HEAD ISLAND, SC 29928 01984200401/23/2025 REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA08/12/2025 C2-01SITE PLAN - WESTNORTHMATCHLINE -SEE SHEET C2-02 R3' R3' BUILDING SETBACK LINEHEAVY DUTY ASPHALT PAVEMENTPROPERTY LINEMILL AND OVERLAY EXISTING PAVEMENTSITE PLAN LEGEND: HEAVY DUTY CONCRETE PAVEMENTPARKING COUNT10PERVIOUS PAVERSEXPOSED AGGREGATE DETECTABLEWARNINGABCDEFGHI SITE KEYNOTE LEGEND:PROPOSED TIE INTO EXISTING CURBPROPOSED 6" STANDARD CURB AND GUTTERPARKING LOT STRIPING, 4" SOLID WHITE STRIPECURBSIDE PICKUP SPACE SIGN4" SOLID WHITE STRIPING, 2'-0" O.C. @ 45°ACCESSIBLE ADA PARKING STALL WITH ACCESSIBLE PARKINGSYMBOL AND SIGNPROPOSED CROSSWALKRECESSED TRUCK DOCK. REFERENCE ARCH PLANS FORDETAILS.JPROPOSED STOP BAR AND SIGNPROPOSED CART CORRALKPROPOSED UTILITY EQUIPMENT PADS, REFERENCEARCHITECTURAL PLANS BY OTHERSLACCESSIBLE ADA VAN PARKING STALL WITH ACCESSIBLEVAN PARKING SYMBOL AND SIGNNPROPOSED BIKE RACKSMPROPOSED DUMPSTER ENCLOSUREOPROPOSED BOLLARDSPPROPOSED LIGHT POLE (SEE LIGHTING PLAN FOR DETAILS)QPROPOSED ADA RAMP, REFERENCE DETAILSPROPOSED EV CHARGING PEDESTAL, REFERENCE ELECTRICALPLANS BY OTHERSRPROPOSED FLUSH CURBSEXTENTS OF ASPHALT PAVEMENT REPLACEMENTTPROPOSED COVERED MAINTENANCE CORRIDOR, REFERENCEARCHITECTURAL PLANSU2,000 GALLON ABOVE GROUND PROPANE TANKVPROPOSED TREE WELL WITH WALLS, REFERENCE GRADINGPLANWPROPOSED FIRE RISER ROOMXGREASE WASTE BARREL PADYPROPOSED ROLLED CURBZPROPOSED EDGE OF PAVEMENT. NO PROPOSED CURB ANDGUTTERAABBPROPOSED 6" STANDARD CURBCCRETURN CURB RAMP DETECTABLE WARNING (SEE SHEET C6-20FOR DETAIL)DDPROPOSED PEDESTRIAN STOP SIGNEEPROPOSED ONE WAY SIGNFFPROPOSED CONCRETE WHEEL STOPSGGPROPOSED R7-113 "NO PARKING EXCEPT WHILE CHARGINGSIGN" (SEE SHEET C6-01) 3 3 3 3 3 3 3 3 3 3 Page 51 of 58 PROPOSEDPATIO±600 SF COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT TYP.TYP. TYP.TYP. E A A A A A A C G IBQTYP. EXISTINGMONUMENTSIGNEXISTINGMONUMENT SIGN FULL ACCESSENTRANCE/EXIT NASSAU STREET CONTRACTOR SHALL RESET/RESTRIPE MULTIUSEPATH TO RELOCATE STOP BAR, STOP SIGN,CONCRETE PAD, AND DETECTABLE WARNING TOTHE REVISED CURB LINE LOCATIONCONTRACTOR SHALL EXTEND THE EXISTINGCROSSWALK TO THE NEW CURB LINE LOCATION NTYP.GPROPOSED ADA RAMP WITHDETECTABLE WARNING TO MATCHEXISTING STREETSCAPE,REFERENCE SCDOT STANDARDDRAWING 720-981-36 Z Z Z TRANSITION FROM FULLHEIGHT CURB AND GUTTERTO ROLL CURB OVER 3', TYP. PROPOSED ADA RAMP WITHDETECTABLE WARNING TO MATCHEXISTING STREETSCAPE,REFERENCE SCDOT STANDARDDRAWING 720-951-11R3'R3'R3'R3'R3'R3'R8'R14.5'R8'R14.5'R3'R3'R10'R3'R5'R3' R3'R3' R5'R3' R3'R5'R5'R3'R3'R5'R3'R3'R12'R3' R5'R5' R3'R10'R3'R3'R3'R3'R3'R3' R2'R30' R5'R3'R3' R50' 9.5'9.5'14' 9.5'18' 12'11' 24' 14' 18'24'18' 9.5'18'26' 18'9.5'24'9.5'15' 18'24'18'9.5'9.5'9.5'9.5'18'24'18' 18'24'18'9.5'9.5' 24' 9.5' 9.62'21.07'18'18' 20' BUILDING SETBACK 20' BUILDING SETBACK 8' 30' BUILDING SETBACK 1212 7 81212134865 313 7 81212 CONTRACTOR SHALL MILL AND OVERLAY THEEXISTING PAVEMENT TO THE NASSAU STREETLANE LINE CC OGTCW SHEET NUMBERPROJECT NO.SCALE:DRAWN BY:DESIGNED BY:CHECKED BY:PROJECT:TITLE: No. DATEBY DATE Drawing name: K:\CHA_LDEV\019842 Brixmor\004 - Circle Center HHI\02 - DWG\PlanSheets\C2-00 - SITE PLAN.dwg C2-02 SITE PLAN - EAST Aug 12, 2025 11:39am by: Olivia.TiceThis document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. © 2025 KIMLEY-HORN AND ASSOCIATES, INC.1080 MORRISON DRIVE, SUITE 240CHARLESTON, SOUTH CAROLINA 29403PHONE (843) 737-6390WWW.KIMLEY-HORN.COMAS SHOWNCLIENT: CERTIFICATE OF AUTHORIZATIONANDNo. C00166INCKIMLEY-HORNASSOCIATES,TUSONILAHCROAOGT REVISIONS0ISSUED FOR DPR REVIEW01/23/2025KHA1REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA2REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA3 04/30/202507/08/2025BRE RETAIL RESIDUAL CIRCLECENTER OWNERS LLC1003 HOLCOMB WOODS PARKWAY,ROSWELL, GA 30076PHONE: (770) 360-8429CIRCLE CENTER HHIREDEVELOPMENT70 POPE AVENUE, HILTON HEAD ISLAND, SC 29928 01984200401/23/2025 REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA08/12/2025 C2-02SITE PLAN - EASTNORTH MATCHLINE -SEE SHEET C2-01 BUILDING SETBACK LINEHEAVY DUTY ASPHALT PAVEMENTPROPERTY LINEMILL AND OVERLAY EXISTING PAVEMENTSITE PLAN LEGEND: HEAVY DUTY CONCRETE PAVEMENTPARKING COUNT10PERVIOUS PAVERSEXPOSED AGGREGATE DETECTABLEWARNINGABCDEFGHI SITE KEYNOTE LEGEND:PROPOSED TIE INTO EXISTING CURBPROPOSED 6" STANDARD CURB AND GUTTERPARKING LOT STRIPING, 4" SOLID WHITE STRIPECURBSIDE PICKUP SPACE SIGN4" SOLID WHITE STRIPING, 2'-0" O.C. @ 45°ACCESSIBLE ADA PARKING STALL WITH ACCESSIBLE PARKINGSYMBOL AND SIGNPROPOSED CROSSWALKRECESSED TRUCK DOCK. REFERENCE ARCH PLANS FORDETAILS.JPROPOSED STOP BAR AND SIGNPROPOSED CART CORRALKPROPOSED UTILITY EQUIPMENT PADS, REFERENCEARCHITECTURAL PLANS BY OTHERSLACCESSIBLE ADA VAN PARKING STALL WITH ACCESSIBLEVAN PARKING SYMBOL AND SIGNNPROPOSED BIKE RACKSMPROPOSED DUMPSTER ENCLOSUREOPROPOSED BOLLARDSPPROPOSED LIGHT POLE (SEE LIGHTING PLAN FOR DETAILS)QPROPOSED ADA RAMP, REFERENCE DETAILSPROPOSED EV CHARGING PEDESTAL, REFERENCE ELECTRICALPLANS BY OTHERSRPROPOSED FLUSH CURBSEXTENTS OF ASPHALT PAVEMENT REPLACEMENTTPROPOSED COVERED MAINTENANCE CORRIDOR, REFERENCEARCHITECTURAL PLANSU2,000 GALLON ABOVE GROUND PROPANE TANKVPROPOSED TREE WELL WITH WALLS, REFERENCE GRADINGPLANWPROPOSED FIRE RISER ROOMXGREASE WASTE BARREL PADYPROPOSED ROLLED CURBZPROPOSED EDGE OF PAVEMENT. NO PROPOSED CURB ANDGUTTERAABBPROPOSED 6" STANDARD CURBCCRETURN CURB RAMP DETECTABLE WARNING (SEE SHEET C6-20FOR DETAIL)DDPROPOSED PEDESTRIAN STOP SIGNEEPROPOSED ONE WAY SIGNFFPROPOSED CONCRETE WHEEL STOPSGGPROPOSED R7-113 "NO PARKING EXCEPT WHILE CHARGINGSIGN" (SEE SHEET C6-01) 3 3 Page 52 of 58 Page 1 kimley-horn.com 1080 Morrison Drive, Suite 240, Charleston, SC 29403 (843) 737-6390 MEMORANDUM To: Town of Hilton Head Community Development Department One Town Center Court, Hilton Head Island, SC 29928 From: Casey Warfield Kimley-Horn and Associates, Inc. Date: 08/28/2025 Subject: Circle Center – Planning Commission Narrative Planning Commission Narrative: Kimley-Horn & Associates Inc. is submitting the following Project Narrative on behalf of BRE Retail Residual Circle Center Owners LLC (Owner/Developer), for a proposed commercial redevelopment on approximately 7.5 acres. The project site, including the parcels with tax map numbers R553-018- 000-0268 and R553-018-000-0269-0000, is zoned Coligny Resort within the jurisdiction of the Town of Hilton Head, Beaufort County. The commercial shopping center is located along Pope Avenue and Nassau Street. The existing developed shopping center contains 13 separate units and 259 parking spaces. This is not a multi-phase project. A pre-application meeting was held on March 4, 2024 (PAPP-000252-2024), a Substitution of Nonconformities for the site was issued on February 12, 2025, and final DRB approval was provided on August 26, 2025. The proposed redevelopment of the Circle Center shopping center consists of upgrades to the existing center façade, replacement and expansion of the existing grocery store, and associated parking and utility infrastructure improvements. The parking improvements within the front parking area are intended to update the existing parking spaces and drive aisle widths in order to be better aligned with best practices for the grocery store customer needs. The proposed 1-story (with mezzanine) ±47,000 sf grocer and ±1,500 sf retail result in an increase of ±3,507 sf of building area. The proposed improvements approximately decrease impervious area by ±0.2 acre. The Owner accepts and retains maintenance responsibility of all proposed improvements on site. Very truly yours; Kimley-Horn and Associates, Inc. Casey Warfield, P.E. Casey.Warfield@kimley-horn.com Page 53 of 58 Stephen G. Riley Municipal Complex One Town Center Court  Hilton Head Island  South Carolina  29928 www.hiltonheadislandsc.gov TO: Planning Commission FROM: VIA: Brian Eber, Principal Planner Trey Lowe, Development Services Program Manager CC: Shawn Leininger, Deputy Town Manager, Interim LMO Official DATE: September 17, 2025 SUBJECT: James Atkins of Court Atkins Group is proposing the redevelopment of 2 Tanglewood for Multifamily use. The subject property is identified as Beaufort County Tax Map Parcel R553 018 000 0330 0000. Town Staff continuously looks for ways to improve its processes. One recent change implemented by Staff for the Development Review Program is to require all Major Development Plan Review applications for new commercial development and Major Subdivision applications to be shared with the Planning Commission. The applications will be presented by Staff for information purposes only. This will provide a way for the Planning Commission and the general public to be made aware of all new developments being proposed on Hilton Head Island. There is one new Major Development Plan Review application ready to be shared with the Planning Commission – DPR-000518-2025 - 2 Tanglewood., a redevelopment of a hotel commissary building into a 20-unit Multifamily structure. The subject property is zoned Resort Development (RD) District and is located within the Corridor Overlay, and is identified on Beaufort County Tax Map 18 as R553 018 000 0330 0000. Attachments: A. DPR-000518-2025 - Site Plans B. DPR-000518-2025 – Narrative TOWN OF HILTON HEAD ISLAND Staff Report Memo Page 54 of 58 C-8SITE IMPROVEMENT PLAN HORIZONTAL SCALE 1" = 20'PLAN SHEET NO.SHEET NAMEDATE ENGINEER OF RECORDNATHAN STURRE, P.E.SC PE# 40266PO Box 2227Bluffton, SC 29910843.929.9432 HORIZ. DATUM:STATE PLANE, NAD83VERT. DATUM: NAVD88 PROJECT:2 TANGLEWOOD DRR553-018-000-0230-0000 08/05/2025 PREPARED FOR:TANGLWOOD CAPITAL SURVEYORPATRICK BOYLAN, PLSBOYLAN SURVEYINGSC PLS#190101446 AUDUBON DRIVE SEAIKEN, SC 29801803.480.4495 08/05/2025 Page 55 of 58 DPR Narrative Project Name: Parcel: 2 Tanglewood Location: 2 Tanglewood Drive Hilton Head Island, SC 29928 Parcel: R553 018 000 0330 0000 Owner: Tanglewood Capital 2140 Vadalabene Drive Maryville, IL 62062 Email – corey@crevocapital.com Cell – (618) 972-4334 Project Description: Tanglewood Capital is proposing the construction of a twenty (20) unit interval occupancy resort at 2 Tanglewood Drive. The property is in the Resort D evelopment (RD) zoning district and COR-RD overlay district. The 1.25-acre lot currently houses a resort development, which will be demolished as part of this effort. The proposed improvements i nclude the removal of the existing site improvements, including all structures, drive aisle s, sidewalks, steps, patios, landings, air conditioning units, etc. Proposed improvements include the construction of the new 3-story resort development, parking, pervious paver drive aisles, concrete sidewalks, and associated infrastructure to accommodate the development. The proposed project will disturb approximately 0.9 acres and will decrease the total impervious area of the lot from 41% to 39%, not including BMP areas or pervious roadways. Runoff from existing and proposed conditions discharges to an onsite detention pond which ultimately outfalls to Broad Creek through the Sea Pines canal system. Site Description The site is generally bordered to the north by the Holiday Inn property on parcel R553 018 000 0230 0000, to the east by the Continental Club on parcel R553 018 000 004B 0000, to the south by the South Forest Beach Drive (State Road S-243), and to the west by Tanglewood Drive (Town owned road). Zoning District: Resort Development (RD) Overlay District: Corridor Overlay District – RD Page 56 of 58 Wetlands: There are no jurisdictional or non-jurisdictional wetlands onsite. Protected Species The site is currently developed and there are no known protected species at the site. Proposed Structure The proposed three-story structure will house 20 interval occupancy units including four (4) 2- bedroom units, six (6) 3-bedroom units, and ten (10) 4-bedroom units. Below is a summary of the proposed unit count and square footages. • 2 Bedroom – 4 units, 1,196 sf each • 3-Bedroom – 6 units, 1,500 sf each • 4-Bedroom – 10 units, 1,800 sf each Vehicle Access: The site is currently accessed through two existing curb cuts along Tanglewood Drive (Town owned road). The improved site will retain the two existing curb cuts. The northern curb cut will be a one- way access in, and the southern curb cut will be a one-way access out. Site Parking: The post-development site requires 30 parking space s per LMO Section 16-3-105.L.2, interval occupancy. The site offers 44 spaces to accommodate proposed 3- and 4-bedroom units where more than 1.5 cars per unit are expected. 42 of the proposed spaces are located under the proposed structures, with the remaining 2 spaces located on the northern drive aisle in. Fire & Rescue Access: The fire department will have vehicular access arou nd the structure through the new drive aisle and new gravel fire drive on the north side of the property. The fire department can access the remainder of the site from Tanglewood Drive. Grading & Stormwater Management: All runoff from the existing and proposed site is r outed to an onsite detention basin on the north side of the property, which ultimately outfalls to Broad Creek through the Sea Pines canal system. As the site reduces overall impervious area from the developed site and reduces the curve number from the site using brick-paver drive aisles, no additional water quantity or quality control measures are proposed. The proposed pervious drive aisles do provide approximately 1,216 cubic feet of additional retention volume upstream of the existing wet detention basin. Page 57 of 58 Underground Utilities: Existing water and sewer connections will be utilized for the proposed structure. Water and sewer services for the site are provided through South Island PSD. The site has ample availability of power and telecommunications. Trash Receptacles & Enclosures: A community dumpster is proposed near the entrance to the parking garage under the building. Maintenance Responsibilities The property will be retained by Tanglewood Capital who will be the responsible party for all site maintenance. Site Lighting Site lighting alternatives are currently being explored, and additional clarity will be provided as the project progresses through the DPR process. All proposed site lighting will conform to LMO standards. Page 58 of 58

Source: Town of Hilton Head Island website. First collected Oct 26, 2026.