Planning Commission Meeting — Agenda Packet
Town of Hilton Head Island · Beaufort County · Planning Commission · meeting of Sep 17, 2025 · Agenda packets
Open the original document More from Town of Hilton Head Island
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Town of Hilton Head Island
Planning Commission Meeting
Wednesday, September 17, 2025, 2:00 PM
1 Town Center Court, Hilton Head Island, SC
Benjamin M. Racusin Council Chambers
The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County
Channel, and Spectrum Channel 1304.
1. Call to Order
2. Pledge to the Flag
3. Adoption of the Agenda
4. Approval of the Minutes
a. Regular Meeting Minutes of August 20, 2025
5. Unfinished Business
a. Consideration of an Ordinance of the Town of Hilton Head Island to Amend
Chapter 16 of the Municipal Code, the Land Management Ordinance, to
Amend the Traffic Impact Analysis Plan Requirements and Traffic Analysis
Standards in Land Management Ordinance Sections 16-2-103, 16-5-106 and
Appendix D, and Providing for Severability and an Effective Date - Shea
Farrar, Pricipal Planner
6. New Business
a. PPR-000829-2025- Public Hearing Request from Scott Harris, with the Town
of Hilton Head Island, for the Public Project Review for a new park facility on
the Town-owned parcel located at 23 Marshland Road. The affected parcel is
Beaufort County Tax Map Parcel R510 008 000 008D 0000. - Shea Farrar,
Pricipal Planner
7. Public Comment - Non Agenda Items
8. Commission Business
9. Chairman's Report
10. Staff Reports
Page 1 of 58
a. DPR-001043-2024 – Axis Engineering Consultants is proposing the
development of an Aldi grocery store at Sea Turtle Marketplace. The subject
property is located at 80 Mathews Drive and is identified as Beaufort County
Tax Map Parcel R511 008 000 0156 0000. - Michael Connolly, Senior Planner
b. DPR-000104-2025 - Casey Warfield of Kimley-Horn and Associates is
proposing the redevelopment of 70 Pope Ave for a grocery store. The subject
properties are identified as Beaufort County Tax Map Parcels R553 018 000
0268 0000 and R553 018 000 0269 0000. - Michael Connolly, Senior Planner
c. DPR-000518-2025 - James Atkins, of Court Atkins Group, is proposing the
redevelopment of 2 Tanglewood Drive for multifamily use. The subject property
is identified as Beaufort County Tax Map Parcel R553 018 000 0330 0000. -
Brian Eber, Principal Planner
11. Adjournment
FOIA Compliance: Public notification of this meeting has been published, posted, and
distributed in compliance with the South Carolina Freedom of Information Act and the
requirements of the Town of Hilton Head Island.
In accordance with the requirements of Title II of the Americans with Disabilities Act of
1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified
individuals with disabilities on the basis of disability in its services, programs, or
activities. Auditory accommodations are available. Any person requiring further
accommodation should contact the Town of Hilton Head Island ADA Coordinator as
soon as possible but no later than 48 hours before the scheduled event.
Municipal Association of South Carolina (MASC) Civility Pledge:
“I pledge to build a stronger and more prosperous community by advocating for civil
engagement, respecting others and their viewpoints, and finding solutions for the
betterment of my city or town.”
Page 2 of 58
Town of Hilton Head Island Planning Commission
Meeting Minutes
8/20/2025 Page | 1
Town of Hilton Head Island
PLANNING COMMISSION MEETING
Wednesday, August 20, 2025, 2:00 PM
Minutes
1. Call to Order
2. Pledge to the Flag
3. Adoption of the Agenda
Commissioner Lobaugh made a motion to adopt the agenda as presented. Commissioner
Siebold seconded. Motion carried 9-0.
4. Chairman's Report
a. New Member Welcome - Mayor Alan Perry
Mayor Alan Perry welcomed new members to the Planning Commission.
5. Approval of the Minutes
a. Regular Meeting Minutes of July 16, 2025
Vice Chair Whaley made a motion to approve the meeting minutes of July 16, 2025.
Commissioner Siebold seconded. Motion carried 9-0.
6. Unfinished Business
7. New Business
a. STDV-000661-2025 – Consideration of a Public Hearing for a street name request
from Brendan Barr of One Street Residential proposing to name four new streets off
Northpointe Circle. The affected parcels are identified on Beaufort County Tax Maps
as Parcels R510 007 000 0121 0000, R510 007 000 0219 0000, R510 007 000 0228
0000, R510 007 000 0230 0000, R510 007 000 0231 0000, R510 007 000 0232
0000, R510 007 000 0233 0000, R510 007 000 0234 0000, R510 007 000 0235
0000, R510 007 000 0236 0000, R510 007 000 0237 0000, R510 007 000 0238
0000, R510 007 000 0239 0000, R510 007 000 0240 0000, R510 007 000 0241
0000, R510 007 000 0242 0000, R510 007 000 0243 0000, and R510 007 000 0265
0000. - Joheida Fister, Deputy Fire Chief
Chairman Henz introduced the item and declared the Public Hearing open. Kathleen
Litchfield, 911 Communications Manager, presented a proposal for 4 new streets off
Northpoint Circle named Northpoint, Fairfiled Station, Dunebrook Court, and Fencliff Trail.
Following the opportunity for public comment and Commission discussion, the Public
Hearing was closed.
Page 3 of 58
Town of Hilton Head Island Planning Commission
Meeting Minutes
8/20/2025 Page | 2
A motion was made by Commissioner Lobaugh to approve the naming of the streets as
presented. Commissioner Redman seconded. The motion passed unanimously.
b. Public Hearing for Consideration of an Ordinance of the Town of Hilton Head Island
to Amend Title 16 of the Municipal Code, the Land Management Ordinance, to
Amend Sections 16-3-105.H, 16-4-102.A.6, 16-4-105, and 16-4-102.B.1 to allow
residential Workforce Housing within the Medical (MED) Zoning District. - Shawn
Leininger, Assistant Town Manager
Chairman Henz introduced the item and declared the Public Hearing open. Ben Brown,
Director of Strategic Initiatives, presented an Ordinance to Amend Chapter 16 of the
Municipal Code, the Land Management Ordinance, to allow for residential Workforce
Housing within the Medical Zoning District. There was an opportunity for public comment
and Commission discussion. The Public Hearing was left open. Staff indicated that
additional information was needed for the associated rezoning, so the action should be
postponed to stay on the same track as the rezoning.
A motion was made by Vice Chair Whaley to postpone the decision until the September
17, 2025 Planning Commission meeting. Chairman Cordes seconded the motion. The
motion passed unanimously.
c. Public Hearing for Consideration of an Ordinance of the Town of Hilton Head Island
to Amend the Official Zoning Map with Respect to the Real Property located at
Bethea Drive to Amend the Palmetto Headlands/H.H. Hospital Master Plan within the
Planned Development Overlay District (PD-2) for Beaufort County Tax Map Parcels
R510 008 000 337A 0000, R510 008 000 0337 0000 and R510 008 000 0452 0000
to change the allocated uses from Commercial Use to Commercial or Residential
Use and to Provide for Severability and an Effective Date. - Shawn Leininger,
Assistant Town Manager
Chairman Henz introduced the item and declared the Public Hearing open. Ben Brown,
Director of Strategic Iniatives, presented the rezoning request, to amend the Palmetto
Headlands/Hilton Head Hospital Master Plan within the Planned Development Overlay
District (PD-2) to change the allocated uses from Commercial Use to Commericlal or
Residential Use.
The applicant then presented to the Committee. Brian Quinn and Keith Kostrzewski, of
Abode spoke regarding the project. Abode is the developer for the project with Novant
Health and the Coastal Community Development Corporation as partners in support. Joel
Taylor of Novant Health discussed his company's involvement with the project to provide
workforce housing to hospital employees. Dave Wetmore, Vice Chair of the Coastal
Community Development Corporation, spoke about their involvement in the project as the
property manager. Staff indicated that additional information related to the Palmetto
Headlands and the Plannded Development Overlay (PD-2) was needed so the action
should be postponed.
Page 4 of 58
Town of Hilton Head Island Planning Commission
Meeting Minutes
8/20/2025 Page | 3
There was an opportunity for public comment and Commission discussion. The Public
Hearing was left open.
A motion was made by Vice Chair Whaley to postpone the decision on the applicant until
the September 17, 2025 meeting. Commissioner Sielbold seconded the motion. The
motion passed unanimously.
d. PPR-000119-2025 - Public Hearing Request from Scott Harris, with the Town of
Hilton Head Island, for the Public Project Review for a new park facility on the Town-
owned parcel located at 252 Wild Horse Road. The affected parcel is Beaufort
County Tax Map Parcel R510 003 000 0027 0000. - Brian Eber, Principal Planner
Chairman Henz introduced the item and declared the Public Hearing open. Brian Eber,
Principal Planner, presented a new park facility on Town-owned property at 252 Wild
Horse Road for Public Project Review. Following an opportunity for public comment and
Commission discussion, the Public Hearing was closed.
A motion was made by Commissioner Lobaugh to approve the Public Project Review
Application as presented. Commissioner Siebold seconded. The motion passed
unanimously.
8. Public Comment - Non Agenda Items
9. Commission Business
a. Nomination and Recommendation to Town Council of Two (2) Planning Commission
Members to Fill Vacancies on the Gullah Geechee Land & Cultural Preservation
Task Force
Commissioner Siebold nominated Commissioners Lobaugh and Hewitt for appointment to
the Gullah Geechee Land & Cultural Preservation Task Force. The nominations will be
forwarded to Town Council for approval.All were in favor.
b. Appointment of Board Secretary for July 1, 2025 - June 30, 2026 Term
This item will be taken up at a later date.
10. Staff Reports
a. DPR-000412-2025 – Jennifer Palmer of Seamon Whiteside & Associates, on behalf
of The Town of Hilton Head Island, is proposing a Workforce Housing Development
Project at 10 Northpointe Circle. This new development consists of multifamily units
and townhome cottages, totaling 157 units and supporting infrastructure. The subject
property is zoned Moderate to High Density Residential District (RM-12) and is
located within the Corridor Overlay. The affected parcels are identified on Beaufort
County Tax Map 7 as Parcels R510 007 000 0121 0000, R510 007 000 0219 0000,
R510 007 000 0230 0000, R510 007 000 0232 0000, R510 007 000 0233 0000,
R510 007 000 0234 0000, R510 007 000 0235 0000, R510 007 000 0236 0000,
Page 5 of 58
Town of Hilton Head Island Planning Commission
Meeting Minutes
8/20/2025 Page | 4
R510 007 000 0237 0000, R510 007 000 0238 0000, R510 007 000 0239 0000,
R510 007 000 0240 0000, R510 007 000 0241 0000, R510 007 000 0242 0000,
R510 007 000 0243 0000, and R510 007 000 0265 0000. - Michael Connolly, Senior
Planner
Chairman Henz introduced the item. Ben Brown, Senior Advisor to the Town Manager,
presented a Development Plan Review as submitted by Seamon Whiteside & Associates
proposing a 157-unit Workforce Housing Project at 10 Northpoint Circle. Following an
opportunity for public comment the Commission concluded discussion on the project and
thanked Mr. Brown for his work to date on this project. The Public Hearing was closed.
11. Adjournment
Chairman Henz adjourned the meeting at 4:10pm
The full recording and a transcript of this meeting can be found on the Town’s website
at www.hiltonheadislandsc.gov
Page 6 of 58
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TOWN OF HILTON HEAD ISLAND
Planning Commission
TO: Planning Commission
FROM: Shea Farrar, Principal Planner
VIA: Michelle Melaer, Community Planning Manager
CC: Shawn Leininger, Assistant Town Manager
Marc Orlando, Town Manager
DATE: September 17, 2025
SUBJECT: Consideration of an Ordinance of the Town of Hilton Head Island to
Amend Chapter 16 of the Municipal Code, the Land Management
Ordinance, to Amend the Traffic Impact Analysis Plan Requirements
and Traffic Analysis Standards in Land Management Ordinance
Sections 16- 2-103, 16 -5-106 and Appendix D, and Providing for
Severability and an Effective Date
RECOMMENDATION:
Consideration of an Ordinance to Amend Chapter 16 of the Municipal Code, t he Land
Management Ordinance, to Amend t he Traffic Impact Analysis Plan Requirements and
Traffic Analysis Standards in 16-2-103, 16-5-106, and Appendix D ., and to provide for
severability and an effective date, and forward a recommendation to Town Council.
The Planning Commission held a public hearing on April 16, 2025, and, after
consideration of the criteria set forth in Land Management Ordinance (LMO) Section 16-
2-103, voted unanimously to recommend that Town Council approve the proposed text
amendment.
On May 19, 2025, the Community Services and Public Safety Committee voted
unanimously to recommend approval to Town Council. with the following items addressed
prior to first reading:
1. Ensure inclusion of downstream impacts on traffic to the requirements;
2. Consider raising level of service to higher than an “F”;
3. Ensure the changes do not impact redevelopment opportunities and consider a
definition of blighted;
4. Clarify the size of the area to be analyzed when the traffic impact is studied; and
5. Consider what multimodal means to Hilton Head Island now and in the future.
Page 7 of 58
Page 2 of 2
On August 19, 2025, Town Council reviewed the proposed amendment, including
changes based on the direction from CSPS and voted unanimously to approve first
reading of the amendment.
The LMO requires that any change or departure from the text amendment that is different
than what was recommended by the Planning Commission shall first be submitted back
to the Planning Commission for review and recommendation in accordance with State
law. Following review and recommendation by the Planning Commission of the additional
changes, the text amendment ordinance will be returned to Town Council for second
reading.
PLANNING COMMISSION ACTION:
LMO Sec.16-2-103-B.2.d states that the Planning Commission's recommendation shall
be based on the standards in Sec. 16- 2-103.B.3, Ordinance Text Amendment Review
Standards.
The Planning Commission has the following options when considering this agenda item.
These include:
1. Recommend approval to Town Council.
2. Recommend denial to Town Council.
3. Recommend approval with conditions to Town Council.
ATTACHMENTS:
1. Staff Report
2. Ordinance
3. Text Amendment (as recommended by the Planning Commission with changes
highlighted in yellow)
Page 8 of 58
Stephen G. Riley Municipal Complex
One Town Center Court ⬧ Hilton Head Island ⬧ South Carolina ⬧ 29928
www.hiltonheadislandsc.gov
TOWN OF HILTON HEAD ISLAND
Town Council
TO: Town Council
FROM: Shawn Leininger, Assistant Town Manager
CC: Marc Orlando, Town Manager
DATE: August 19, 2025
SUBJECT: Consideration of an Ordinance of the Town of Hilton Head Island to
Amend Chapter 16 of the Municipal Code, the Land Management
Ordinance, to Amend the Traffic Impact Analysis Plan Requirements
and Traffic Analysis Standards in Land Management Ordinance
Sections 16 -2-103, 16 -5-106 and Appendix D, and Providing for
Severability and an Effective Date
RECOMMENDATION:
Consideration of an Ordinance to Amend Chapter 16 of the Municipal Code, the Land
Management Ordinance, to Amend the Traffic Impact Analysis Plan Requirements and
Traffic Analysis Standards in 16-2-103, 16-5-106, and Appendix D ., and to provide for
severability and an effective date, and forward a recommendation to Town Council.
The Planning Commission held a public hearing on April 16, 2025, and, after
consideration of the criteria set forth in Land Management Ordinance (LMO) Section 16-
2-103, voted unanimously to recommend that Town Council approve the proposed text
amendment.
On May 19, 2025, the Community Services and Public Safety Committee voted
unanimously to recommend approval to Town Council. with the following items addressed
prior to first reading:
1. Ensure inclusion of downstream impacts on traffic to the requirements;
2. Consider raising level of service to higher than an “F”;
3. Ensure the changes do not impact redevelopment opportunities and consider a
definition of blighted;
4. Clarify the size of the area to be analyzed when the traffic impact is studied; and
5. Consider what multimodal means to Hilton Head Island now and in the future.
Page 9 of 58
Page 2 of 11
BACKGROUND:
Revitalize and Modernize the Economy is a focus area in the adopted Town Council 2023-
2025 Strategic Action Plan. In fulfillment of this focus area, Strategy #1 Establish a
Growth Management Strategy states the Town will:
“Successfully manage increasing and evolving future growth patterns in a manner that
will ensure sustainability of Hilton Head Island’s unique character. Additionally, the
Town must monitor economic and demographic trends, undertaking a comprehensive
list o f future planning activities, and proactively protecting the Island’s rich natural
resources through appropriate design, regulation, and capital investment practices.”
In this regard, Town Council directed Town Staff to advance amendments to the Land
Management Ordinance (LMO) in the 2024 Strategic Action Work Plan. The effort has
been divided into two separate projects, the f ull LMO Overhaul and the priority
amendments. The priority amendments include incremental changes to both the LMO
and portions of the Municipal Code related to land management that address important
and urgent issues in advance of the full LMO Overhaul. These priority amendments
address pressing community development issues with the best short-term solution while
minimizing unintended outcomes. Issues that require additional analysis and research or
are more complex are recommended to be further explored during the full LMO Overhaul.
At the September 24, 2024, Town Council Workshop, Town staff received the following
comments and direction regarding amendments related to Traffic Impact Analysis.
1. Change name from Traffic Impact Analysis to Transportation Impact Analysis Plan
(TIAP) to account for a multimodal approach (ie: car, bicycle, pedestrian, public
transit, plane, etc.)
2. Reduce the threshold a develop ment needs to meet to trigger a mandatory TIA P
from 100 peak hour trips to 50 peak hour trips.
3. Include multimodal infrastructure (suc h as bike paths, sidewalks, transit) in the
analysis.
4. Include more impact mitigation options.
5. Clarify subject matter approval by the Town Engineer instead of the LMO Official
as a best practice.
6. Add unsignalized intersections level of service standard including mitigation
requirements and remove the discounting of impacts due to “background traffic ,”
(i.e. the trips generated by previously existing development).
The Planning Commission held a public hearing on April 16, 2025, and, after
consideration of the criteria set forth in Land Management Ordinance (LMO) Section 16-
2-103, voted unanimously to recommend that Town Council approve the proposed text
amendment.
On May 19, 2025, the Community Services and Public Safety Committee voted
unanimously to recommend approval to Town Council with items to be addressed prior
Page 10 of 58
Page 3 of 11
to first reading. The following is a list of the Committee items followed by a response /
action taken to address each item:
1. Ensure inclusion of downstream impacts on traffic to the requirements.
The study area to be considered within Transportation Impact Analysis Plan
studies is determined in accordance with Appendix D -11(B)8, which requires that
a minimum of three signalized intersections on major arterials to be analyzed. Any
traffic circle or roundabout may be included as a study intersection analyzed at the
direction of the Town Engineer, and the Town Engineer may request that
unsignalized intersections be analyzed, effectively vesting the Town Engineer with
the authority to determine the study area limits. Section 16-5-105(A)5.e, which is
not proposed for revision, requires that site access for all development review
applications be compliant with SCDOT’s design standards as outlined in their
Access and Roadside Management Standards manual relative to geometric
design and the need to provide any turn lanes.
2. Consider raising level of service to higher than an “F”.
A level of service of “F” is not accepted. The standards within the existing and
proposed text establish a minimum threshold level of service of “D”.
3. Ensure the changes do not impact redevelopment opportunities and consider a
definition of blighted.
To find a balance between the mitigation of traffic impacts from development and
supporting the redevelopment of properties that previously generated traffic, Town
staff have proposed the following amendment to Section 16-2-103.J.4.b., “If the
proposed development is located on a previously developed parcel, then the
number of peak hour trips projected to be generated by the proposed development
shall be reduced by the number of trips generated by the previous development
during the peak hour for the preceding twenty four months. If the resulting number
is less than 50 peak hour trips, a Transportation Impact Analysis Plan is not
required for the proposed development.”
4. Clarify the size of the area to be analyzed when the traffic impact is studied.
Similar to item 1 above, t he study area to be considered within a Transportation
Impact Analysis Plan is determined in accordance with Appendix D-11(B)8, which
requires that a minimum of three signalized intersections on major arterials to be
analyzed. Any traffic circle or roundabout may be included as a study intersection
analyzed at the direction of the Town Engineer, and the Town Engineer may
request that unsignalized intersections be analyzed, effectively vesting the Town
Engineer with the authority t o determine the study area limits. Section 16 -5-
105.A.5.e. already requires that site access for all development review applications
be compliant with SCDOT’s design standards as outlined in their Access and
Page 11 of 58
Page 4 of 11
Roadside Management Standards manual relative to geometric design and the
need to provide any turn lanes.
5. Consider what multimodal means to Hilton Head Island now and in the future.
Multimodal is a common transportation term that involves the use of multiple
modes of transport for moving people or goods. The most typical modes are
walking, biking, public transit, railways, motor vehicles, waterways, and airways.
In the case of Hilton Head Island and the LMO, multimodal considers the
movement of people and goods on roadways and pathways to encompass a
variety of users, including motorists, transit users, carriers of goods, cyclists, and
pedestrians, including those with disabilities.
SUMMARY OF AMENDMENT:
Effective transportation planning is essential for managing growth, ensuring mobility, and
maintaining a safe and efficient transportation network. As communities develop, new
projects introduce additional traffic, impacting roads, intersections, and multi modal
infrastructure such as sidewalks, bike lanes, and transit systems. Without proper
assessment, development can lead to congestion, safety hazards, and infrastructure
strain.
For the Town, t his type of assessment is conducted during the development approval
process and involves a detailed study of projected traffic volumes, travel patterns, and
potential impacts on roadway safety and congestion. The analysis helps determine
whether improvements , such as roadway expansions, new traffic signals, pedestrian
enhancements, or transit service modifications , are necessary to maintain efficient and
safe travel conditions as identified by the study parameters.
While these studies are designed to assess how new projects affect traffic, there are
concerns about whether the Town’s current process and requirements truly addresses
the needs of residents and adequately mitigate transportation impacts resulting from new
development and redevelopment . As part of the priority amendments, the Town is
proposing to update its current requirements for these studies for a more comprehensive
approach that better reflects the transportation needs of everyone, including pedestrians,
cyclists, and transit users.
The proposed amendments strengthen the Town’s requirements by:
1. Expanding the scope of stud y beyond traffic to include multimodal infrastructure
such as sidewalks, bike lanes, and transit services,
2. Reducing the threshold for requiring a traffic study from 100 peak-hour trips to 50
peak-hour trips, ensuring that even moderate developments undergo proper
transportation impact review,
3. Expanding the type of mitigation options that can be used to address transportation
impacts,
Page 12 of 58
Page 5 of 11
4. Shifting approval authority from the LMO Official to the Town Engineer for
consistency with best practices,
5. Adding new standards for unsignalized intersections, and
6. Eliminating exemptions associated with trips generated by previously existing
development.
These updates will make the Town’s process more responsive to the community's needs
and promote a more balanced, multimodal, and forward -thinking approach to
transportation planning, ensuring that growth aligns with the Town’s long -term mobility
and infrastructure goals . These changes are part of an ongoing effort to update the
Town’s regulations, with further revisions expected during the full LMO update.
ANALYSIS:
Proposed Amendments
The Town currently requires a “Traffic Impact Analysis Plan.” Examples of projects that
recently required a TIAP include:
1. 147 Residential Units on Jonesville Road and
2. 132 Residential Units on Office Way
It is proposed to be renamed to the “Transportation Impact Analysis Plan” (TIAP) to reflect
a more comprehensive, multimodal approach that includes biking, walking, and transit.
Oversight of TIAPs has shifted from the LMO Official to the Town Engineer to ensure
technical accuracy and alignment with best practices.
As part of this amendment, the threshold for requiring a TIAP is proposed to be lowered
from 100 to 50 peak hour trips, thereby increasing the number of projects subject to
analysis. For instance, two recent projects that were not required to provide a TIA P but
were exempted due to the trips factored in for previously existing development would
have been required to provide a TIAP under the proposed language are the following:
1. Timeshare development on Folly Field Road near Islanders Beach Park and
2. Waterfront restaurant on Squire Pope Road near the Rowing and Sailing Center
at Squire Pope Community Park
The proposed TIAP amendments would also require the evaluation of multimodal
infrastructure, such as bike paths, sidewalks, and public transit options. Transportation
impacts can be mitigated by expanded and more flexible mitigation strategies to address
transportation impacts, such as replacing a traffic signal or uncontrolled intersection with
a roundabout that meets the Town’s operational and design standards , c hanges to
locations or design of median crossovers and removal of changes to the number and
location, or design of access points. Additionally, new standards for unsignalized
intersections have been introduced, requiring mitigation for impacts.
Page 13 of 58
Page 6 of 11
The following table demonstrates how the proposed amendments address demonstrated
issues.
Issue Proposed Amendment
Clarify subject matter
approval by the Town
Engineer instead of the
LMO Official as a best
practice.
The Town Engineer is now referenced throughout the text
amendment as the decision-making authority concerning
Transportation Impact Analysis Review.
Change name from
Traffic Impact Analysis
Plan to Transportation
Impact Analysis Plan to
account for a multimodal
approach.
Reduce the threshold a
developer needs to meet
to trigger a mandatory
TIA from 100 peak hour
trips to 50 peak hour
trips.
Sec.16-2-103. Application Specific Review Procedures
J. Traffic Transportation Impact Analysis Plan Review
1. Applicability
a. The A Traffic Transportation Impact Analysis
Plan, monitoring and mitigation
requirements, and procedures set forth in
this section are applicable to all
development as defined in this Title that
would generate 50 or more peak hour trips,
except for that as specifically exempted in
paragraph 4 below of this subsection.
Add unsignalized
intersections level of
service standard
including mitigation
requirements.
Chapter 16-5-106:
C. Traffic Impact Analysis Plan Service Level
Standards
3. The average total day delay on any approach to a
traffic circle or roundabout the Sea Pines Circle
does not exceed 150 seconds per vehicle during
the peak hour for an average July weekday, and
the average total delay on any approach to any
other traffic circle or roundabout does not exceed
55.0 seconds per vehicle during the peak hour for
an average July weekday; and
4. The Level of Service (LOS) for any vehicular
traffic movement does not decline by more than
one level per the requirements of the Highway
Capacity Manual (HCM), nor to a Level of
Service of “F”; and
Page 14 of 58
Page 7 of 11
5. The development causes safety issues or delays
that require mitigation as determined by the Town
Engineer.
Include multimodal
infrastructure (such as
bike paths, sidewalks,
transit) in the analysis.
Appendix D:
Application Submittal Requirements
D-11. Traffic Transportation Impact Analysis Plan
Review
B. Submittal Requirements
7. The impact on non-motorized travel shall be based on
the procedures and practices recommended by ITE,
Transportation Research Board (TRB), AASHTO
and FHWA. The applicant shall incorporate where
possible any non -motorized recommendations
included in Town and/or regional long-term plans in
the vicinity of the site. The study should identify
potential changes such as:
a. Improvements to pedestrian crossings;
b. Additional pedestrian or bicycle crossings;
c. Improvements to pedestrian signals, pedestrian
signal intervals, signs, and pavement
markings;
d. Construction of additional sidewalks or non -
motorized pathways;
e. Changes to the site design and access to ease
non-motorized travel and reduce conflicts with
vehicles, from the public right -of-way to the
building entrances or on-site activity; and
f. Other similar improvements to transportation
facilities.
Modify the discounting of
impacts due to
“background traffic.”
i.e. the trips generated
by previously existing
development.
Per the recommendation
of Community Services
Public Safety
Committee, a
4. Exemptions
The following types of development shall be exempt from
the Traffic Transportation Impact Analysis Plan and
mitigation requirements of this section:
b. Development that would generate fewer than
peak hour trips on the adjacent street.
i. If the proposed development will be
replacing a vacant or occupied structure on
the same site, then for the purpose of
Page 15 of 58
Page 8 of 11
modification has been
drafted to support the
redevelopment of
property (see yellow
highlighted text).
determining exemptions, the number of peak
hour trips generated by the proposed land
use shall be reduced by the number of peak
hour trips generated by the most recent
legally established land use.
ii. Proof of the most recent principal land use of
a site shall be the responsibility of the
applicant and shall be submitted to the
Official for approval. Absent such proof, the
peak hour trip rate will be based on the lowest
trip generation of all the uses permitted by
right in the site's zoning district.
b. If the proposed development is located on a
previously developed parcel, then the number
of peak hour trips projected to be generated
by the proposed development shall be
reduced by the number of trips generated by
the previous development during the peak
hour for the preceding twenty four months. If
the resulting number is less than 50 peak hour
trips, a Transportation Impact Analysis Plan is
not required for the proposed development.
Include more impact
mitigation options.
Appendix D:
Application Submittal Requirements
D-11. Traffic Transportation Impact Analysis Plan
Review
B. Submittal Requirements
8. 10. If the initial computerized analysis indicates that
the Town's adopted traffic service level
standards will be not be met, a mitigation plan must
be included in the plan based on at least one
additional computer analysis. This mitigation plan
must show how the Town's adopted traffic service
level standards will be satisfied. Applicants will
only shall be responsible to mitigate the traffic
transportation impacts of their proposed
Page 16 of 58
Page 9 of 11
development. Acceptable roadway mitigation
measures are limited to the following:
a. Traffic signal timing adjustments; timing or
phasing revisions, that not only mitigate traffic
impacts generated by this development, but also
result in safe and acceptable operations at the
study intersection as demonstrated by a network
traffic analysis;
b. Traffic signal phasing adjustments; Addition of
signs, signals, markings, or other measures to
accommodate road crossings and improve safety
for pedestrians and achieve ADA compliance;
c. Pavement marking revisions;
d. Adding additional intersection turn lanes not to
exceed 4 lanes on minor arterial approaches and
5 lanes on major arterial approaches; and
e. Geometric improvements to traffic circles or
roundabouts signalized or unsignalized
intersections, including traffic circles or
roundabouts, to improve traffic operations,
pedestrian and bicycle operations or to improve
safety;
f. Road widening;
g. Adding a traffic signal at a location that is
warranted per the Manual of Uniform Traffic
Control (MUTCD);
h. Replacing a traffic signal or uncontrolled
intersection with a roundabout that meets the
Town’s operational and design standards;
i. Changes to locations or design of median
crossovers to reduce congestion and mitigate
accidents;
j. Removal of changes to the number and location,
or design of access points to reduce congestion
and mitigate accidents;
k. Additional signage;
l. Other transportation-related safety improvements
identified and/or recommended by the Town
Engineer.
Page 17 of 58
Page 10 of 11
Nonconformities
Chapter 16-7 provides standards for nonconformities. This amendment will not create
nonconformities and is not applicable.
Text Amendment Review Standards
Section 16-2-103.B.3 of the LMO provides standards for the review of Text Amendments
and states the following:
“In determining whether to recommend that Town Council adopt or deny the proposed
text amendment, the Planning Commission may weigh the relevance of and consider
whether and the extent to which the proposed Text Amendment:
a. Is in accordance with the Comprehensive Plan;
b. Is required by changed conditions;
c. Addresses a demonstrated community need;
d. Is consistent with the purpose and intent of the zoning districts in this Ordinance,
or would improve compatibility among uses and ensure efficient development
within the Town;
e. Would result in a logical and orderly development pattern; and
f. Would not result in significantly adverse impacts on the natural environment,
including but not limited to water, air, noise, stormwater management, wildlife,
vegetation, wetlands, and the natural functioning of the environment.”
The proposed text amendment aligns with the review criteria, as it:
1. Supports the Comprehensive Plan , which includes the following strategy and
tactic: “Maintain, evaluate, and update as needed traffic analysis standards to
guide development in accordance with the existing and future needs of the Town.”
2. Is required due to increased traffic and congestion.
3. Addresses a demonstrated community need to mitigate traffic impact and includes
consideration of essential multimodal transportation options.
4. Ensures that overall transportation impacts and mitigation efforts are consistent
with the intent of the LMO.
5. Results in safer and less congested streets and intersections ensuring orderly
development and transportation networks.
6. Minimizes the overall impact of Town-wide development and resulting traffic.
TOWN COUNCIL REVIEW AND DECISION:
Section 16 -2-103.B.2.e of the LMO provides standards for the decision of Text
Amendments.
The Town Council shall review th e application, staff report, and Planning Commission
recommendation and make a final decision on the application. The Town Council's
decision shall be one of the following:
Page 18 of 58
Page 11 of 11
1. In this case, should Town Council support the Community Services Public Safety
Committee recommendations, any change or departure from the text amendment
that is different than what was recommended by the Planning Commission shall
first be submitted back to the Planning Commission for review and
recommendation in accordance with State law. Following review and
recommendation by the Planning Commission of the additional changes, the text
amendment ordinance will be returned to Town Council for second reading.
2. Otherwise, Town Council shall:
a. Adopt an ordinance approving the Text Amendment as recommended by
Planning Commission; or
b. Adopt a resolution denying the Text Amendment.
ATTACHMENTS:
1. Ordinance
2. Text Amendment (as recommended by Planning Commission with Community
Services Public Safety Committee recommendations in yellow highlighted text)
Page 19 of 58
Attachment 1 –Transportation Impact Analysis Amendment Ordinance
Page 1 of 4
AN ORDINANCE OF THE TOWN OF HILTON HEAD
ISLAND
ORDINANCE NO. 2025-____
AN ORDINANCE OF THE TOWN OF HILTON HEAD ISLAND TO
AMEND CHAPTER 16 OF THE MUNICIPAL CODE, THE LAND
MANAGEMENT ORDINANCE, TO AMEND THE TRAFFIC IMPACT
ANALYSIS PLAN REQUIREMENTS AND TRAFFIC ANALYSIS
STANDARDS IN LAND MANAGEMENT ORDINANCE SECTIONS
16-2-103, 16-5-106 AND APPENDIX D, AND PROVIDING FOR
SEVERABILITY AND AN EFFECTIVE DATE.
WHEREAS, The Town Council previously adopted a Strategic Action Plan for 2023-
2025, and Strategy Number 1 states that the Town will:
Successfully manage increasing and evolving future growth patterns in a
manner that will ensure sustainability of Hilton Head Island’s unique
character. Additionally, the Town must monitor economic and demographic
trends, undertaking a comprehensive list of future planning activities, and
proactively protecting the Island’s rich natural resources through appropriate
design, regulation, and capital investment practices; and,
WHEREAS, at its September 24, 2024, Town Council Workshop, Town staff
received the following comments and direction regarding amendments to the Land
Management Ordinance related to Traffic Impact Analysis Standards:
1. Change name from Traffic Impact Analysis to Transportation Impact Analysis Plan
to account for a multimodal approach.
2. Reduce the threshold a developer needs to meet to trigger a mandatory TIA from 100
peak hour trips to 50 peak hour trips.
3. Include multimodal infrastructure (such as bike paths, sidewalks, transit) in the
analysis
4. Include more impact mitigation options.
5. Clarify subject matter approval by the Town Engineer instead of the LMO Official as
a best practice.
6. Add unsignalized intersections level of service standard including mitigation
requirements and remove the discounting of impacts due to “background traffic,”
(i.e., the trips generated by previously existing development); and,
WHEREAS, the Town Council finds that Traffic Impact Analysis studies are important
tools and assist the Town in avoiding congestion in the streets, undue concentration of
population, safety hazards and overburdening of public infrastructure and also assist the
Town in facilitating the creation of a convenient, attractive, and harmonious community;
and,
Attachment 2
Page 20 of 58
Attachment 1 –Transportation Impact Analysis Amendment Ordinance
Page 2 of 4
WHEREAS, the Town Council finds that the best interests of the Town, and the health,
safety and welfare of its citizens, property owners, residents and visitors will be furthered
by an amendment to the Land Management Ordinance Traffic Impact Analysis Plan
Requirements and Traffic Analysis Standards to change the title to Transportation Impact
Analysis Plan, amend applicability requirements, modify the threshold for requiring an
analysis plan, increase mitigation options to modernize the transportation review process,
prioritize multimodal considerations, and ensure a thorough evaluation of development
impacts on the transportation network by including the following requirements:
Expanding the scope of Traffic Impact Analysis studies to include multimodal
infrastructure such as sidewalks, bike lanes, and transit services,
Reducing the threshold for requiring a study from 100 peak-hour trips to 50 peak-
hour trips, ensuring that even moderate developments undergo proper
transportation impact review,
Expanding the type of mitigation options that can be used to address transportation
impacts,
Shifting approval authority from the LMO Official to the Town Engineer for
consistency with best practices,
Adding new standards for unsignalized intersections, and
Eliminating exemptions associated with trips generated by previously existing
development; and,
WHEREAS, the Town Council finds that these requirements will make the
development review process more responsive to the community's needs and promote a
more balanced, multimodal, and forward-thinking approach to transportation planning,
ensuring that growth aligns with the Town’s long-term mobility and infrastructure goals
and that these things are in the best interests of the Town, and that the health, safety and
welfare of its citizens, property owners, residents and visitors will be furthered by them;
and,
WHEREAS, on April 16, 2025, the Planning Commission held a Public Hearing to consider the proposed amendments to change the applicability and to
include multimodal options, and the public had an opportunity to comment on the proposed amendments, and the Planning Commission voted unanimously to recommend that Town Council adopt the amendments Land Management Ordinance
Traffic Impact Analysis Plan Requirements and Traffic Analysis Standards; and, WHEREAS, on May 19, 2025, the Community Services and Public Safety Committee discussed the proposed amendments to change the applicability and
include multimodal options, and voted ___ to recommend that Town Council adopt the amendments Land Management Ordinance Traffic Impact Analysis Plan
Requirements and Traffic Analysis Standards; and,
WHEREAS, the Town Council finds that the best interests of the Town, and the
health, safety and welfare of its citizens, property owners, residents and visitors will be
furthered by this amendment to the Land Management Ordinance Traffic Impact Analysis
Page 21 of 58
Attachment 1 –Transportation Impact Analysis Amendment Ordinance
Page 3 of 4
Plan Requirements and Traffic Analysis Standards which will aid in avoiding congestion in
the streets, undue concentration of population, safety hazards and overburdening of public
infrastructure and also assist the Town in facilitating the creation of a convenient,
attractive, and harmonious community.
NOW, THEREFORE, BE IT ORDERED AND ORDAINED BY THE TOWN COUNCIL FOR THE TOWN OF HILTON HEAD ISLAND, SOUTH CAROLINA, AND IT IS HEREBY ORDERED AND ORDAINED BY AND UNDER AUTHORITY OF SAID TOWN COUNCIL, AS FOLLOWS:
Section 1. Amendment. That the Land Management Ordinance is amended as shown on Exhibit “A” to this Ordinance. Newly added language is illustrated with double underline and deleted language is illustrated with strikethrough.
Section 2. Severability. If any section, phrase, sentence, or portion of this Ordinance is for any reason held invalid or unconstitutional by any court of competent jurisdiction, such portion shall be deemed a separate, distinct, and independent provision, and such holding shall not affect the validity of the remaining portions thereof.
Section 3. Effective Date. This Ordinance shall be effective upon its adoption by the Town Council of the Town of Hilton Head Island, South Carolina.
Page 22 of 58
Attachment 1 –Transportation Impact Analysis Amendment Ordinance
Page 4 of 4
PASSED, APPROVED, AND ADOPTED BY THE COUNCIL FOR THE
TOWN OF HILTON HEAD ISLAND ON THIS _____ DAY OF __ , 2025.
THE TOWN OF HILTON HEAD ISLAND, SOUTH CAROLINA
____________________________
Alan R. Perry, Mayor
ATTEST:
_____________________________
Kimberly Gammon, Town Clerk
First Reading:
Second Reading:
APPROVED AS TO FORM:
_____________________________
Curtis L. Coltrane, Town Attorney
Page 23 of 58
Attachment 3: Exhibit A: Transportation Impact Analysis Plan Amendment
Chapter 16-2:
Administration
Sec.16-2-103. Application Specific Review Procedures
J. Traffic Transportation Impact Analysis Plan Review
1. Purpose
The purpose of this subsection is to establish procedures and standards for the review
and decision on Traffic Transportation Impact Analysis Plans, to ensure new
development does not create street congestion beyond an amount established as
acceptable by the Town.
2. Applicability
a. The A Traffic Transportation Impact Analysis Plan, monitoring and
mitigation requirements, and procedures set forth in this section are
applicable to all development as defined in this Title that would generate
50 or more peak hour trips, except for thatas specifically exempted in
paragraph 4 belowof this subsection.
b. Development Plan approval, with or without conditions or modifications,
nor a Building Permit, shall not be granted until without the applicant
has received for Development Plan approval first obtaining Traffic of a
Transportation Impact Analysis Plan approval in accordance with this
section, in addition to all other requirements, unless the development is
specifically exempt as provided for in this Chapter.
c. A Building Permit may not be issued for development undertaken in
accordance with a previously issued final development permit until the
applicant first obtains Traffic Transportation Impact Analysis Plan
approval, unless the development is exempt.
3. Trip Generation Rates
Trip generation rates shall be taken from the most current edition of the Institute of
Transportation Engineers'ITE Trip Generation Manual (ITE Manual), except; provided,
however, that an applicant may elect to perform, at the applicant's expense, a trip
generation study which shall be submitted to the Official Town Engineer in determining
an exemption. The An applicant’s trip generation study shall be undertaken by a
qualified traffic transportation engineering firm selected in accordance with Appendix
D.11, and is subject to review and approval by the Official Town Engineer. For any
proposed uses use not specifically listed in the ITE Manual, the Official Town Engineer
shall determine the most appropriate trip generation rate. The Official Town Engineer
may consider input from the applicant in making this decision.
Trip rates shall be generated for pass-by trips, internal trips and multi-modal trips that
are generated by a mode other than a personal motor vehicle. Trip rate reductions must
Page 24 of 58
Page 2 of 14
be supported by the ITE handbooks or, if local data is used, approved by the Town
Engineer.
4. Exemptions
The following types of development shall be exempt from the Traffic Transportation
Impact Analysis Plan and mitigation requirements of this section:
a. Activities and uses not constituting development (see Sec. 16-1-104.B,
Development Activities Constituting Development), or exempt from
Development Plan approval (see Sec. 16-2-103.G.3, Exemptions).
b. Development that would generate fewer than 100 peak hour trips on the
adjacent street.
i. If the proposed development will be replacing a vacant or occupied
structure on the same site, then for the purpose of determining
exemptions, the number of peak hour trips generated by the
proposed land use shall be reduced by the number of peak hour
trips generated by the most recent legally established land use.
ii. Proof of the most recent principal land use of a site shall be the
responsibility of the applicant and shall be submitted to the Official
for approval. Absent such proof, the peak hour trip rate will be based
on the lowest trip generation of all the uses permitted by right in the
site's zoning district.
If the proposed development is located on a previously developed
parcel, then the number of peak hour trips projected to be generated by
the proposed development shall be reduced by the number of trips
generated by the previous development during the peak hour for the
preceding twenty four months. If the resulting number is less than 50
peak hour trips, a Transportation Impact Analysis Plan is not required for
the proposed development.
b. A residential development generating less than 200 peak hour trips
in which at least 20 percent of the units will qualify and be maintained
as affordable housing in accordance with this Ordinance.
5. Traffic Transportation Impact Analysis Plan Review Procedure
a. Application Submittal
An application for Traffic Transportation Impact Analysis Plan Review may be
submitted by persons identified in Sec. 16-2-102.C.1, and shall be submitted in
accordance with Sec. 16-2-102.C.
b. Staff Review and Action
I. No or Minor Mitigation Required
Page 25 of 58
Page 3 of 14
For any proposed development that does not require any mitigation or for which
mitigation is limited to adjustments to signal timing, signal phasing, or intersection
restriping, or improvements serving non-motorized travel, the Official Town
Engineer shall review and make a final decision on the application in
accordance with Sec. 16-2-102.D. The Official's decision shall be based on the
standards in Sec. 16-2-103.J.6, Traffic Transportation Impact Analysis Plan
Standards, and shall be one of the following:
01. Approve the application as submitted;
02. Approve the application subject to conditions of approval or
modifications; or
03. Deny the application.
II. Major Mitigation Required
Page 26 of 58
Page 4 of 14
Where the proposed development requires mitigation beyond just adjustments
to signal timing, signal phasing, or intersection re-striping, or improvements
serving non-motorized travel, the Official Town Engineer shall review the
application and prepare a staff report with a recommendation for action in
accordance with Sec. 16-2-102.D. The Official's Town Engineer’s
recommendation shall be based on the standards in Sec. 16-2-103.J.6,
Traffic Transportation Impact Analysis Plan Standards. Any mitigation
improvements should comply with the latest edition of SCDOT’s Access and
Roadside Management Standards (ARMS) manual and SCDOT Roadway
Design Manual.
c. Decision-Making Body Review and Decision
I. For any proposed development that requires mitigation beyond just adjustments
to signal timing, signal phasing, or intersection re-striping, the Planning
Commission shall review the application and staff report at a public meeting
and make a final decision on the application in accordance with Sec. 16-2-
102.G. The Commission's decision shall be based on the standards in Sec. 16-2-
103.J.6, Traffic Transportation Impact Analysis Plan Standards, and shall be one
of the following:
01. Approve the Traffic Transportation Impact Analysis Plan as submitted;
02. Approve the Traffic Transportation Impact Analysis Plan subject to
conditions of approval or modifications; or
03. Deny the Traffic Transportation Impact Analysis Plan.
II. Traffic Transportation Impact Analysis Plans containing mitigation other than
that allowed in Appendix D (specifically D-11.B.8) will not be accepted.
d. Post-Decision Actions and Limitations
I. Notice of Decision
The Official Town Engineer shall provide notice of the final decision on the
application in accordance with Sec. 16-2-102.H.1.
II. Appeal
01. Appeals from the final decision of the Official Town Engineer on an
application for Traffic Transportation Impact Analysis Plan Review are
governed by Sec. 16-2-103.U, Appeal of Official's Decision to Planning
Commission, and S.C. Code Ann. § 6-29-1150.
02. Appeals from the decision of the Planning Commission on an
application for Traffic Transportation Impact Analysis Plan Review are
governed by S.C. Code Ann. § 6-29-1150.
Page 27 of 58
Page 5 of 14
6. Traffic Transportation Impact Analysis Plan Standards
The proposed Traffic Transportation Impact Analysis Plan shall not be approved unless
it is demonstrated the Town's street system can operate and comply with the Town's
adopted traffic service level standards, and the plan complies with Sec. 16-5-106,
Traffic Transportation Analysis Standards.
7. Expiration of Approval
A Traffic Transportation Impact Analysis Plan approval shall expire after one (1) year
from the date of approval unless the applicant submits a complete Development Plan
review application.
8. Amendment
A Traffic Transportation Impact Analysis Plan may be amended only in accordance with
the procedures and standards for applicable to its original approval.
9. Traffic Transportation Mitigation Program Implementation
a. Timing of Implementation
If a traffic transportation mitigation program is part of an approved Traffic Transportation
Impact Analysis Plan, all approved traffic transportation mitigation improvements must
be implemented prior to issuance of a Certificate of Compliance unless otherwise
provided for as part of the approved Traffic Transportation Impact Analysis Plan.
b. Responsibility for Costs of Improvement; Reimbursement
I. Except as provided for in provisions ii through iv below, t The costs of
implementation of an approved mitigation program shall be the responsibility of the
applicant, except as follows:.
II. If an applicant is required to provide an improvement that would otherwise be
funded by transportation impact fees, a transportation impact fee credit shall be
available as provided in accordance with Sec. 16-5-116.K, Offsets to Impact Fees.
III. If an applicant is required to provide an improvement which is eligible for a
transportation impact fee credit as provided for in accordance with Sec. 16-5-
116.K, Offsets to Impact Fees, and the cost of the improvement exceeds the
amount of the transportation impact fee otherwise calculated to be due in
accordance with that section, the applicant may submit a plan for reimbursement
to the Town Council for action. Such reimbursement plan shall be consistent with
the Town's contractual obligations with respect to other planned street
improvements and consistent with the Town's adopted Capital Improvements
Program (CIP).
IV. If an applicant is required to provide an improvement, other than a site-related
traffic transportation improvement that is eligible for funding with transportation
impact fees, or if an applicant proposes a change in priorities in the adopted CIP,
the applicant may submit a proposal to the Town Council requesting
consideration for inclusion of such improvement in the CIP or for a shifting of
Page 28 of 58
Page 6 of 14
priorities within the CIP, together with a proposed reimbursement plan which is
consistent with the requirements of this section.
10. Traffic Transportation Monitoring and Evaluation Report
a. Report
Annually, following the preparation of the June July intersection turning movement
counts, the Official Town Engineer shall prepare a Traffic Transportation Monitoring
and Evaluation Report, which shall include each of the following:
I. Peak hour traffic turning movement counts for an average June July weekday for
all signalized intersections as measured by the Town Engineer;
II. Twenty-four hour traffic volumes on William Hilton Parkway, Palmetto Bay Road,
Pope Avenue, and the Cross Island Parkway as measured by the Town Engineer;
III. Historical trends over the past five years if available for items in paragraph II above;
IV. Description of the operating conditions, relative to the adopted traffic service level
standards, for each signalized intersection and how the operating conditions have
changed since the last reporting period;
V. Morning, midday, and afternoon peak hour volumes for Sea Pines Circle in reports
for years evenly divisible by five two; and
VI. Recommendations for mitigation improvements to intersections that fail to meet
the traffic transportation standards outlined in Sec. 16-5-106, Traffic Transportation
Analysis Standards.
b. Certification of Traffic Transportation Data
Based on the Traffic Transportation Monitoring and Evaluation Report, Traffic
Transportation Impact Analysis Plans, and such other information as deemed
appropriate, the Official Town Engineer shall certify the traffic transportation data to be
used by all applicants, traffic transportation engineers, Town staff and consultants, in
performing and reviewing Traffic Transportation Impact Analysis Plans. The Official
Town Engineer will certify the traffic volume data on an annual basis or more frequently
as deemed appropriate.
c. Planning Commission Action
I. The Traffic Transportation Monitoring and Evaluation Report prepared by the
Official Town Engineer as described above shall be forwarded to the Planning
Commission and simultaneously conveyed to the Town Council. Upon receipt of
the Report and recommendations from the Official Town Engineer, the Planning
Commission shall give notice and hold a public meeting for the purpose of
discussing the Report and recommendations and eliciting public comments.
II. Following its review, the Planning Commission shall forward the Traffic
Transportation Monitoring and Evaluation Report and recommendations, and may
forward its own supplemental report and recommendations, to the Town Council.
Page 29 of 58
Page 7 of 14
11. Vehicular Multimodal Access Analysis
a. All development shall have an access analysis undertaken by the Official Town
Engineer. This analysis shall be undertaken to ensure that vehicular and multi-
modal access to all proposed developments and subdivisions is accomplished in
a safe manner.
b. This analysis will identify any vehicular access improvements the applicant must
install at the applicant's expense, such as deceleration lanes, and shall identify
the location of any curb cuts based on, but not limited to sight distances, existing
roadway infrastructure, opposing driveways locations, and shared vehicular
access. This analysis will address requirements for adequate driveway design
including, but not limited to turning radius and stacking distance. The standards in
the South Carolina Department of Transportation's Access and Roadside
Management Standards Manual shall serve as a guide for this review.
c. This analysis will identify any improvements required to serve non-vehicular site
access, including any modifications to or improvements of pathway crossings
being impacted by the site development.
d. The vehicular and multimodal access requirements approved by the Official Town
Engineer shall be incorporated on development or subdivision plans prior to their
approval. If an applicant is required to provide site-related traffic improvements,
the cost of implementing such improvements shall be borne by the applicant and
no such costs shall be eligible for a credit or offset from any transportation impact
fees required in accordance with Sec. 16-5-116.K, Offsets to Impact Fees.
Chapter 16-5:
Development and Design Standards
Sec.16-5-106. Traffic Transportation Analysis Standards
A. Purpose
The purpose of this section is to guide development in accordance with the existing
and future needs of the Town in order to protect, promote and improve the public
health, safety, morals, convenience, order, appearance, prosperity and general welfare
of the citizens of the Town, by ensuring new development does not overburden and
overly congest streets, pathways, sidewalks, and other transportation systems in the
Town.'s streets.
B. Intent
The regulations of this section are designed and intended:
1. To ensure that the Town's adopted traffic transportation service level
standards are met within the Town and to provide safety from fire, panic and
other dangers, to promote the public health and general welfare, to prevent the
Page 30 of 58
Page 8 of 14
overcrowding of land, to avoid undue concentration of population, and to
facilitate safe and the adequate provision of street and non-motorized facilities.
2. To enable the Town Engineer or their designee to conduct an appropriate
review and evaluation of the traffic multimodal transportation impacts of
proposed development, to provide for the imposition of conditions in order to
assure that new development does not impair the safety and the Town's
ability and obligation to provide adequate adequacy of impacted street and
transportation facilities to all its used by the Town’s citizens, and to prescribe
necessary project-specific mitigation measures or to otherwise changes to the
site design or operations, and establish the implementation timing and funding,
as part of the condition traffic impact analysis plan approval.
3. To ensure that no traffic transportation impact analysis plan approvals are
granted that would cause a reduction in the service level of any street facility
that is currently operating in a manner that fails to satisfy the Town's adopted
traffic service level standards.
4. To ensure that no traffic transportation impact analysis plan approvals are
granted unless street facilities with adequate capacity to accommodate the
traffic generated by the proposed development are available concurrently with
the scheduled opening of the development.
5. To establish uniform procedures for the review of applications for traffic
transportation impact analysis plan approval subject to the traffic transportation
impact analysis plan requirements set forth herein.
6. To better coordinate the short-term growth potential of the Town with the
immediately available street system capacity, taking into account exempt
development and approved development that has not been built, to the
extent to which these may be eligible for development plan approval without
being subject to the traffic transportation impact analysis plan requirements of
this section.
7. To better coordinate the long-term growth potential of the Town with an
realistic assessment of street capacity which is currently and which may in the
future become available, recognizing the limitations on the Town's financial
resources, the constraints presented by the geography of the Island, and the
need to preserve the Island's sensitive natural, historic, and environmental
resources.
8. To better coordinate the type, location, amount, timing, and rate of
development of proposed land uses in accordance with the Comprehensive
Plan, zoning district regulations, and Official Zoning Map with the present and
projected future availability of street system capacity.
9. 8. To establish and maintain a traffic monitoring system to regularly determine the
volume of traffic on the Town's street system and the degree to which
capacity limits ("thresholds") are being approached or exceeded. To require
that Transportation Impact Analysis Plans are prepared by a licensed
Page 31 of 58
Page 9 of 14
professional transportation engineer, and that the plan contents and modeling
are consistent with national guidelines and practices published by the Institute
of Transportation Engineers (ITE), the Transportation Research Board
(TB), the Federal Highway Association (FHWA), the American Association
of State Highway and Transportation Officials (ASHTO), the National
Association of City Transportation Officials.
10. 9. It is not the intent of this section to deny to any person a reasonable
opportunity to develop land in a beneficial manner, but rather to coordinate the
type, location, amount, timing, and rate of development with the Town's
reasonable ability to provide adequate public street facilities consistent with
the Town's adopted traffic service level standards. To ensure that, in
addition to measuring the impact on the roadway system, the transportation
impact analysis plan measures the multimodal impacts, and mitigation
measures, for non-motorized travel and transit.
10. To establish and maintain a traffic monitoring system to regularly determine the
volume of traffic of the Town’s street system and the degree to which capacity
limits (“thresholds”) are being approached or exceeded.
C. Traffic Service Level Standards
All required traffic transportation impact analysis plans shall, at a minimum, indicate
compliance or non-compliance with the standards of this section.
1. The average total delay in seconds per vehicle for each signalized intersection
does not exceed 55.0 seconds during the peak hour for an average July
weekday; and
2. The volume-to-capacity (V/C) ratio for each signalized intersection does not
exceed 0.90 during the peak hour for an average July weekday; and
3. The average total day on any approach to a traffic circle or roundabout the Sea
Pines Circle does not exceed 150 seconds per vehicle during the peak hour
for an average July weekday., and the average total delay on any approach to
any other traffic circle or roundabout does not exceed 55.0 seconds per vehicle
during the peak hour for an average July weekday; and
4. The Level of Service (LOS) for any vehicular traffic movement does not decline
by more than one level per the requirements of the Highway Capacity Manual
(HCM), nor to a Level of Service of “F”; and
5. The development causes safety issues or delays that require mitigation as
determined by the Town Engineer.
Page 32 of 58
Page 10 of 14
Appendix D:
Application Submittal Requirements
D-11. Traffic Transportation Impact Analysis Plan Review
A. Plan Preparation
1. Selection of Traffic Transportation Engineering Firm
The Traffic Transportation Impact Analysis Plan shall be prepared for the
applicant by a qualified traffic Transportation engineer/engineering firm,
selected from a list of traffic engineering firms maintained by the Town. The list
shall be created through the solicitation by the Town of professional traffic
engineers qualified to perform this service. The list shall contain the names of
at least three traffic engineering firms. approved by the Town Engineer or their
designee, and sealed by a licensed professional engineer registered in South
Carolina.
2. Establishment of Traffic Transportation Impact Plan Parameters
a. Prior to beginning the Traffic Transportation Impact Analysis Plan, the
applicant shall supply the Official Town Engineer with the following:
I. A written narrative describing the proposed land use(s), size and
projected opening date of the project and any phases. The narrative
must also identify the Beaufort County Tax Map and parcel numbers
to be occupied by the proposed development;
II. A site location map; and
III. A proposed site plan showing the location of the proposed
development on the site and vehicular access to public or private
streets or any other development.
IV. A study area map or maps that illustrate the intersections to be
evaluated in the study, along with the relevant pedestrian and non-
motorized pathway systems. The non-motorized map shall generally
depict expected walking and bicycling patterns (origan and
destinations), where people will cross roadways, and improvements
needed. Public transportation systems shall be included in this study
area map as well.
V. For uses, as determined by the Town Engineer or their designee, a
review of the transit or other mobility options, and how they can be
accommodated on or near the site.
Page 33 of 58
Page 11 of 14
b. Based on this information, along with the ITE Trip Generation Manual and
available information on land use, travel patterns and traffic conditions, the
Official Town Engineer will supply in writing to the applicant or the
applicant's selected engineering firm the parameters to be followed in the
study, including the study area for all modes, directional split of driveway
traffic, trip distribution to multiple access points, trip distribution on the
study area roadway network background traffic growth rate, previously
approved or proposed projects that are but not completed projects, and
the intersections to be analyzed along with any associated turning
movement counts and signal timing data that which are available.
B. Submittal Requirements
An acceptable traffic transportation impact analysis plan shall include an accurate
representation of the following elements:
1. A current site plan or subdivision plat identifying access to and from
existing or proposed streets and intersections. In addition, a vicinity map shall
be provided.
2. Description of the proposed development, including the type of proposed land
use, the number of residential units by type, the number of existing and
proposed lots, the type of proposed non-residential development and the
amount of such development measured by gross floor area or other
appropriate unit of measure, the general size and type of accessory
development or facilities, and, for non-residential development, adequate
information to identify the appropriate land use category or categories for trip
generation.
3. Traffic, pedestrian, and bicycle counts must be collected and analyzed if the
existing data is more than two years old or is determined to be unavailable by
Town Engineer. The existing conditions shall consider and include any
development in the study area that has generated a previous application for a
TIAP study or other development in the study area that is projected to occur
within five (5) years from the TIAP study as determined by the Town Engineer.
Projected vehicular trips to and from the completed development, or any
interim development phases, on the adjacent street during the a.m. and p.m.
peak hours of the surrounding roadway network. In some cases the Town
Engineer may also require an analysis of Saturday conditions or the peak
hours of the proposed land-use. The percentage of passerby pass-by trips, if
used in the plan, shall be included, as well as the source of this information.
The trips shall be presented as “Multi-Modal Trips” with a listing of pass-by
trips, internal trips (within the development), pedestrian, bicycle, transit, ride-
hailing, or other trips. In cases where multi-use pathway segments or pathway
crossings are being impacted by the development, the Town Engineer shall
also require analysis of projected levels-of-service.
Page 34 of 58
Page 12 of 14
4. A written narrative setting forth the assumptions upon which any projection,
made in developing the traffic transportation impact analysis plan required
under this part, is based upon. If the assumptions are derived from the ITE
manual, the materials excerpts shall be identified. If the assumptions are not
from the ITE manual, appropriate excerpts will the referenced materials shall
be included in the study and the reasoning underlying the assumptions shall be
stated in the narrative. If the project predicts fewer auto trips due to various
travel demand management measures, assurances that those measures will
be applied and are enforceable will be determined by the Town Engineer.
5. The traffic Transportation Impact Analysis Plan study shall be based on
intersection analysis procedures for signalized intersections and roundabouts
or traffic circles as identified in the Transportation Research Board's (TRB)
current Highway Capacity Manual Special Report 209 and utilize computer
software which emulates these procedures and is acceptable to the Official
Town Engineer. Any analysis involving a traffic circle will utilize computer
software which is designed to analyze traffic circles and is acceptable to the
Official. The results of any required computer analysis shall, at a minimum,
indicate compliance or non-compliance with the traffic transportation standards
of Sec. 16-5-106, Traffic Transportation Analysis Standards.
6. Safety data in the study area, when required by the Town Engineer, shall
include the types of collisions. The study should describe how safety will be
influenced by the project’s transportation impacts and evaluate potential
solutions. Potential mitigation measures shall be consistent with the American
Association of State Highway and Transportation Officials AASAHTO Highway
Safety Manual, Federal Highways Administration (FHWA) guides on non-
motorized crossings, and other national research.
7. The impact on non-motorized travel shall be based on the procedures and
practices recommended by ITE, Transportation Research Board (TRB),
AASHTO and FHWA. The applicant shall incorporate where possible any non-
motorized recommendations included in Town and/or regional long-term plans
in the vicinity of the site. The study should identify potential changes such as:
a. Improvements to pedestrian crossings;
b. Additional pedestrian or bicycle crossings;
c. Improvements to pedestrian signals, pedestrian signal intervals, signs, and
pavement markings;
d. Construction of additional sidewalks or non-motorized pathways;
e. Changes to the site design and access to ease non-motorized travel and
reduce conflicts with vehicles, from the public right-of-way to the building
entrances or on-site activity; and
f. Other similar improvements to transportation facilities.
Page 35 of 58
Page 13 of 14
6.8. The intersections which must be analyzed in the study are identified as:
a. Any signalized intersection that serves as a development's point of
access to a major arterial. This will include intersections of public and
private roads with major arterials, and driveways offering direct access to
a major arterial; and
b. The first signalized intersection on either side of the development's
primary point of access to a major arterial; and
c. Other signalized intersections on major arterials if within 1 road mile of the
development's primary point of access to a major arterial and when in
the opinion of the Official Town Engineer there is a potential for a
significant impact to the intersection's level of service from site related
site-related traffic; and
d. Any traffic circle or roundabout, when in the opinion of the Official Town
Engineer, there is a potential for a significant impact to the circle's level of
service from site related traffic.
7.9. At a minimum, the plan must include the results of a computerized analysis
projecting the operating conditions of critical intersections relative to signalized
intersections and roundabouts or traffic circles identified in 8. above. The
intersections shall meet the Town's adopted traffic service level standards
outlined in 16-5-106. All other intersections must be projected to operate at
levels of service acceptable to the Town Engineer. The analysis shall reflect
the projected condition of these intersections and movements based on the full
operation and/or build-out of the development date of the development and,
where applicable, on other significant phase-in dates of the development
project.
8.10. If the initial computerized analysis indicates that the Town's adopted traffic
service level standards will be not be met, a mitigation plan must be included
in the plan based on at least one additional computer analysis. This mitigation
plan must show how the Town's adopted traffic service level standards will
be satisfied. Applicants will only shall be responsible to mitigate the traffic
transportation impacts. of their proposed development. Acceptable roadway
mitigation measures are limited to the following:
a. Traffic signal timing adjustments; timing or phasing revisions, that not only
mitigate traffic impacts generated by this development, but also result in
safe and acceptable operations at the study intersection as demonstrated
by a network traffic analysis;
b. Traffic signal phasing adjustments; Addition of signs, signals, markings, or
other measures to accommodate road crossings and improve safety for
pedestrians and achieve ADA compliance;
c. Pavement marking revisions;
Page 36 of 58
Page 14 of 14
d. Adding additional intersection turn lanes not to exceed 4 lanes on minor
arterial approaches and 5 lanes on major arterial approaches; and
e. Geometric improvements to traffic circles or roundabouts signalized or
unsignalized intersections, including traffic circles or roundabouts, to
improve traffic operations, pedestrian and bicycle operations or to improve
safety;
f. Road widening;
g. Adding a traffic signal at a location that is warranted per the Manual of
Uniform Traffic Control (MUTCD);
h. Replacing a traffic signal or uncontrolled intersection with a roundabout
that meets the Town’s operational and design standards;
i. Changes to locations or design of median crossovers to reduce congestion
and mitigate accidents;
j. Removal of changes to the number and location, or design of access
points to reduce congestion and mitigate accidents;
k. Additional signage;
l. Other transportation-related safety improvements identified and/or
recommended by the Town Engineer.
Page 37 of 58
TOWN OF HILTON HEAD ISLAND
COMMUNITY DEVELOPMENT DEPARTMENT
One Town Center Court, Hilton Head Island, SC 29928 843-341-4757 FAX 843-842-8908
STAFF REPORT
PUBLIC PROJECT REVIEW
Case# Pro· ect Name Public Hearin Date
PPR-000829-2025 Patterson Famil Park Se tember 17, 2025
Project Location Applicant
23 Marshland Road Scott Harris
Hilton Head Island, SC 29926 Town of Hilton Head Island
1 Town Center Court
Parcels: RS 10 008 000 008D 0000 & Hilton Head Island, SC 29928
RS 10 008 000 0460 0000
Application Summary
PPR-000829-2025- Public Hearing Request from Scott Harris, with the Town of Hilton Head Island,
for the Public Project Review for a new park facility on the Town-owned parcel located at 23
Marshland Road. The affected parcel is Beaufort County Tax Map Parcel RS 10 008 000 008D 0000
Staff Recommendation
Staff recommends the Planning Commission find this application to be consistent with the Town's
Comprehensive Plan (Our Plan) for location, character, and extent based on those Findings of Fact
and Conclusions of Law as determined by the LMO Official and enclosed herein.
Back1:?;round
Parks and Recreation is one of the
Major Core Values under the Town's Our Plan. Under the Parks
and Recreation Core Value, there are 8 Major Goals, one of them being to provide best-in-class
recreation facilities and programs in the Island's public parks, and another being to promote multi
dimensional inclusion and access for all parks, facilities, and recreation programming. Patterson
Family Park is anticipated to have a blend of family oriented use by the public on a daily basis,
particularly at the play features, providing paved handicapped parking, a sidewalk, and fixed toilet
facilities with running water will contribute to the Town's Comprehensive Plan goals of providing
best-in-class parks and recreation facilities, and accessible facilities and routes at the Town's parks.
Descri tion of Pro·ect
The proposed park will feature pedestrian pathways and crosswalks, vehicular access and parking, and
internal interpretive signage. It will also include passive open lawn spaces, a playground and a covered
avilion e ui ed with restrooms, tables, ·us, and seatin areas. Pathwa sw ill be scattered
1
Page 38 of 58
Page 39 of 58
Page 40 of 58
Page 41 of 58
Attachment A - Location
Page 42 of 58
Page 43 of 58
23 PROMENADE STREET, SUITE 201 BLUFFTON, SC 29910 OFFICE: (843) 757.7411
PUBLIC PROJECT REVIEW NARRATIVE Patterson Family Park Parcel Number: R510 008 000 008D 0000 The Town of Hilton Head Island is proposing the development of a new park on a Town owned parcel located at 23 Marshland Rd. Currently the property is undeveloped wooded lot. Creation of this park is consistent with Hilton Head Island’s 2020 to 2040 Comprehensive Plan to develop the Patterson Tract as a mini park. The vision for this project is to provide a neighborhood park that tells the story of this land, nestled within the Marshland Historic Gullah Neighborhood. Woven into that story is a commitment to honor the community’s voice—incorporating the features they asked for during neighborhood meetings. These include a multi-purpose lawn, playground, a pavilion with restrooms, oyster roasting / grilling area, observation area overlooking Broad Creek, and walking paths. Guided by the site analysis, each element has been thoughtfully placed to complement and the site’s existing composition: specimen live oaks, broad creek views, and integration with Beautiful Island Square and adjacent residences.
Page 44 of 58
Page 45 of 58
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TO:
FROM:
VIA:
CC:
DATE:
SUBJECT:
Planning Commission
Michael Connolly, Senior Planner
Trey Lowe, Development Services Program Manager
Shawn Leininger, Deputy Town Manager, Interim LMO Official
September 17, 2025
Axis Engineering Consultants is proposing the development of an Aldi grocery
store at Sea Turtle Marketplace. The subject property is located at 80 Mathews
Drive, is zoned CC (Community Commercial), is within the Airport and Corridor
Overlays and has the Property Identification Number of R511 008 000 0156 0000.
Town Staff continuously looks for ways to improve its processes. One recent change
implemented by Staff for the Development Review Program is to require all Major
Development Plan Review applications for new commercial development and Major
Subdivision applications to be shared with the Planning Commission. The applications will be
presented by Staff for information purposes only. This will provide a way for the Planning
Commission and the general public to be made aware of all new developments being proposed
on Hilton Head Island.
There is one new Major Development Plan Review application ready to be shared with the
Planning Commission – DPR-001043-2025 – Aldi Grocery Store. Axis Engineering Consultants is
proposing the development of an Aldi grocery store at Sea Turtle Marketplace. The subject
property is located at 80 Mathews Drive, is zoned CC (Community Commercial), is within the
Airport and Corridor Overlays and has the Property Identification Number of R511 008 000
0156 0000.
Attachments:
A. DPR-001043-2025 - Site Plan
B. DPR-001043-2025 - Narrative
TOWN OF HILTON HEAD ISLAND
Staff Report Memo
Page 46 of 58
MATHEWS DRIVE - PUBLIC R/WVARIES
N/F
MATTHEWS COURT LLC
N/F
GG REIF I SEA TURTLE LLC
(PARCEL-C)
N/F
GG REIF I SEA TURTLE LLC
(PARCEL-D)
N/F
DRAYTON-PARKERCOMPANIES LLC
(PARCEL-E)
N/F
GG REIF I SEA TURTLE LLC
(PARCEL-C)
VERSION 7.0 PROTOTYPE
(RIGHT HAND ENTRY, SIDE DOCK)
±21,867 SF INCLUDING CANOPY
CANOPY SF: ±1,181
BUILDING SF: ±20,686
FFE: 15.20
11
8 8
2
2
7
6
61 2 3 4
CURBSIDE CURBSIDE
CURBSIDE
CURBSIDE
20' BUILDING SETBACK
20' BUILDING SETBACK
50' BUILDING SETBACK
50' BUILDING SETBACK
7
1'
10'
9'
10'
18'
12'
R6'
R3' R6'
R6'
R6'
R3'
R3'
5'
8'8'8'8'5'8'9'
20'
9'
9'
18'
9'18'
10'
10'
10'
10'
10'
10'
10'
10'
10'10'
30'18'24'
18'
10'
R100'
R15'
R50'
R67'
R12'
R15'
R130'
R5'
R5'
R5'
R5'
8'
24'
30'
R15'
R15'
R15'
R5'
10'
8.5'
8.5'
10'
5'
R15'
R15'
4'
30'
4'
6'
R15'
24'
R400'
R300'
5' 8'
R2'R2'
5'
5'
10'
R20'
R20'
24'
76'
49.33'
24.67'
1
1
1
1
1
1
1
2
2
2
3
3
3
4
4
5
5
6
6
8
9
10
10
11
11
11
7
13
14
15
16
16
16
17
18
18 20
20
22
22
18
2
11
11
2
18
1
3
11
5
5
12
1
5
22
4
8
21
21
22
19
19
19
19
12
23
24
25
26
27
22
6
6
5'
R3'
28
15'
R11'
R5'
R5'R3'
R5'
22
11
11
6
1
1
R11'
R11'
R15'
R15'R5'
3'
R3.5'R5'
R5'
9'10' 10'
R5'
R15'
10'
R35'
R15'
R8'
R3'
15'
10'
27
29
R53'
9'
10'
R5'
R5'
2.5'
10
10
10
10
10
ALL PROPOSED SIDEWALK TO MATCH
EXISTING SHELL TEXTURE SEEN
THROUGHOUT EXISTING SEA
TURTLE MARKETPLACE
10'
10'
30
SHEET
OF
9
10
8
7
6
5
4
3
2
DATE NO.DESCRIPTION
REVISIONS
DATE OF PLANS
1
AEC PROJECT NUMBER
Z:\Shared\AEC\Projects\2025\25-25029 ALDI - W. H. Pkwy Hilton Head Island, SC\DWG\61153C_B01.dwg - 7/21/2025 3:25 PM
C4.0 31
ALDI AT HILTON HEAD ISLAND
ALDI, INC.
SITE PLAN
2/11/2025 REV PER TOWN OF HILTON HEAD
REV PER TOWN OF HILTON HEAD
REV PER TOWN OF HILTON HEAD
-
-
-
-
-
-
-
4/25/2025
7/21/2025
-
-
-
-
-
-
-
7/19/2024
25-25029
HILTON HEAD ISLAND,
BEAUFORT COUNTY, SOUTH
CAROLINA
PARKING CALCULATIONS:
REQUIRED MINIMUM PARKING STALLS:
ONE STALL PER 200 SF GFA
20,644 SF / 200 SF * 1 STALL = 103.2 STALLS - 2 STALLS (REDUCED BY ONE STALL
PER 10 BICYCLE STALLS) = 101.2 STALLS
101 STALLS REQUIRED
REQUIRED MINIMUM ELECTRICAL VEHICLE (EV) CHARGING STATIONS
ONE STATION PER SITE
REQUIRED MINIMUM BICYCLE STALLS
2 BICYCLE STALLS PER EVERY 10 VEHICLE STALLS
101 STALLS / 10 * 2 STALLS = 20.2 STALLS
20 STALLS REQUIRED
PROVIDED PARKING STALLS:
46 STANDARD STALLS, 2 EV STALLS, 4 CURBSIDE PICK-UP STALLS, 5 HANDICAP
STALLS, AND 44 EXISTING SHARED STALLS
101 STALLS TOTAL
PROVIDED ELECTRICAL VEHICLE (EV) CHARGING STATIONS
2 EV STALLS TOTAL
PROVIDED BICYCLE STALLS
4 BICYCLE RACKS; EACH WITH 5 STALLS
20 STALLS TOTAL
GENERAL SITE NOTES:
1. HANDICAPPED PARKING AND ACCESSIBLE ROUTES SHALL MEET THE
AMERICANS WITH DISABILITIES ACTS STANDARDS FOR ACCESSIBLE
DESIGN - LATEST EDITION. SIDEWALKS SHALL NOT EXCEED 5% MAXIMUM
LONGITUDINAL SLOPE AND 2% MAXIMUM CROSS SLOPE. ACCESSIBLE
PARKING STALLS SHALL NOT EXCEED 2% MAXIMUM SLOPE IN ALL
DIRECTIONS. ACCESSIBLE RAMPS SHALL NOT EXCEED 12H:1V GRADE.
2. ALL SIGNS AND STRIPING SHALL CONFIRM TO THE MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES (MUTCD) - LATEST EDITION AND/OR
DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS.
3. ALL DIMENSIONS ARE MEASURED TO THE FACE OF CURB (WHEN PRESENT),
EDGE OF ASPHALT AND/OR EDGE OF BUILDING.
4. HORIZONTAL DATA SHOWN HEREON IS BASED ON NAD83 SOUTH CAROLINA
STATE PLANES, US FOOT. VERTICAL DATA SHOWN HEREON IS BASED ON
NAVD 88(12B).
SITE INFORMATION
PROJECT ADDRESS80 MATTHEWS DRIVE, HILTON HEAD
ISLAND, SOUTH CAROLINA 29926
PARCEL NUMBERR511 008 000 0156 0000 (2.81 AC)
PARCEL ZONINGCC (COMMUNITY COMMERCIAL)
PROJECT AREA±2.81 ACRES
BUILDING SETBACKLANDSCAPE SETBACK
FRONT50'FRONTN/A
SIDE20'SIDEN/A
REAR20'REARN/A
0'
GRAPHIC SCALE 1" =
30' 15'30'
30'
R
Call 811 Before you Dig
HATCH LEGEND:
STANDARD DUTY
ASPHALT PAVEMENT
CONCRETE SIDEWALK
(MATCH EXISTING
DEVELOPMENT)
HEAVY DUTY ASPHALT
PAVEMENT
HEAVY DUTY
CONCRETE PAVEMENT
KEY NOTES:
18" CURB & GUTTER
24" WHITE STOP BAR; PAINT
4" WHITE PARKING STALL STRIPING; PAINT
5" BLUE HANDICAP STALL/LOADING AREA STRIPING; PAINT
HANDICAP / VAN ACCESSIBLE SIGN (R7-8 & R7-8P); MOUNTED ON WALL
36" STOP SIGN (R1-1)
12" CONCRETE RIBBON CURB (EDGE RESTRAINT)
6" YELLOW TRAFFIC STRIPING - 18" OC @ 45°; PAINT
CART WALL (SEE ARCHITECTURAL / STRUCTURAL PLANS)
5" DOUBLE YELLOW CENTERLINE STRIPING; PAINT
PAVEMENT MARKING - STRAIGHT ARROW (SCDOT STD); PAINT
6' RAMP WITH MAX 12:1 SLOPE
CART STORAGE (SEE ARCHITECTURAL PLANS)
CONCRETE WHEEL STOP (ALL PARKING SPOTS ALONG BUILDING)
DUMPSTER GATE (SEE ARCHITECTURAL PLANS)
10" CONCRETE BOLLARD (SEE ARCHITECTURAL / STRUCTURAL PLANS)
3" STEEL PIPE POST (SEE ARCHITECTURAL / STRUCTURAL PLANS)
PIPE GUARDRAIL AND HANDRAIL (SEE ARCHITECTURAL PLANS)
UNDERGROUND DETENTION BED LIMITS
LOADING DOCK WALL (SEE ARCHITECTURAL / STRUCTURAL PLANS)
BICYCLE RACK (MINIMUM 5 BICYCLES PER RACK)
TACTILE PAVING (2' MIN)
3' TALL MODULAR RETAINING WALL (±75 LF); SEE DETAIL SHEET
ELECTRICAL VEHICLE (EV) PARKING STALL WITH CHARGING STATION
12" x 30" CURBSIDE PICK-UP PARKING SIGN (SEE DETAIL SHEET)
CURBSIDE PICK-UP PARKING PAVEMENT MARKINGS (60" WHITE
NUMBERS AND 24" BLUE STRIP WITH 12" LETTERS; SEE DETAIL SHEET)
2' CURB TAPER
1
2
3
4
5
6
7
8
PERVIOUS PAVERS
(MATCH EXISTING)
9
10
11
12
13
14
15
16
17
18
EXISTING CONCRETE
EXISTING ASPHALT
PAVEMENT
19
20
21
22
EXISTING DIRT ROAD
EXISTING GRAVEL EXISTING BRICK
PAVERS
WETLAND AREA
PRE-DEVELOPEDPOST-DEVELOPED
TOTAL AREA 2.81 AC100%TOTAL AREA 2.81 AC100%
IMPERVIOUS 0.09 AC 3.2% IMPERVIOUS 1.66 AC 59.0%
PERVIOUS 2.72 AC 96.8% PERVIOUS 1.15 AC 41.0%
23
24
25
26
27
N
CONCRETE TRANSFORMER PAD (SEE MEP PLANS)28
No. 7594
SOUTH CAROLINA
CERTIFICATE OF AUTHORIZATION
AXIS ENGINEERING CONSULTANTS
No. 33627
SOUTH CAROLINA
LICENSED PROFESSIONAL ENGINEER
BRAIN HILL BRAUN
296" HEADER CURB
30RAISED WALKING PLATFORM (SEE LANDSCAPE PLAN)
________________________
Page 47 of 58
Advanced Engineering Services, LLC. • Phone: 800-416-8136
OFFICES IN: Albany, GA • Valdosta, GA • Warner Robins, GA • Tal lahassee, FL
February 13, 2025
Town of Hilton Head
Community Development Department
1 Town Center Court
Hilton Head Island, SC 29928
CDIC@hiltonheadislandsc.gov
RE: ALDI, Inc. – Sea Turtle Marketplace
P
arcel # R511 008 000 016 0000 – Intersection of US HWY 278 & Mathews Drive
Hilton Head, Beaufort County, South Carolina
Dear Town of Hilton Head,
We are proposing the construction of an ALDI, Inc. store at the Sea Turtle Marketplace, located off William Hilton
Parkway (US HWY 278). This project includes the development of a 20,664 square-foot commercial building, new
utility infrastructure, parking lot installation, pedestrian access, a Stormwater Management Plan, and landscaping.
The site is situated within the Airport Overlay District, near the edge of the Runway Protection Zone, Zone A. To
ensure compliance, we engaged the Federal Aviation Administration (FAA) for a report and investigation regarding
the feasibility of construction in this area, and we also consulted with local airport director Jon Rembold. Based
on the local airport review, we meet all requirements, with the exception of the Land Use portion under the CLUE
tool analysis. While we understand the position of the local airport review, the Greenberg Gibbons team and ALDI
are aware that the Town code does not consider this review as final, as it is just one aspect of the overall approval
process.
Additionally, we have received FAA confirmation that the project poses no hazard to air navigation. The FAA's
determination letter is included in the submittal documents for your review.
If you have any questions, please contact our office at 1-800-416-8136 or via email at aespermit@aesllc.us.
Sincerely,
Advanced Engineering Services, LLC
B. Matthew Inman, PE
Associate Vice President
Page 48 of 58
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TO: Planning Commission
FROM:
VIA:
Michael Connolly, Senior Planner
Trey Lowe, Development Services Program Manager
CC: Shawn Leininger, Deputy Town Manager, Interim LMO Official
DATE: September 17, 2025
SUBJECT: Casey Warfield of Kimley Horn, is proposing the redevelopment of a grocery store
at 70 Pope Ave. The subject properties are zoned Coligny Resort (CR) District and
are located within the Corridor Overlay. The subject parcels are identified on
Beaufort County Tax Map 18 as R553 018 000 0268 0000 and R553 018 000 0269
0000.
Town Staff continuously looks for ways to improve its processes. One recent change
implemented by Staff for the Development Review Program is to require all Major
Development Plan Review applications for new commercial development and Major
Subdivision applications to be shared with the Planning Commission. The applications will be
presented by Staff for information purposes only. This will provide a way for the Planning
Commission and the general public to be made aware of all new developments being proposed
on Hilton Head Island.
There is one new Major Development Plan Review application ready to be shared with the
Planning Commission – DPR-000104-2025 - 70 Pope Ave., a redevelopment of a grocery store.
The subject properties are zoned CR District and are located within the Corridor Overlay, and
are identified on Beaufort County Tax Map 18 as R553 018 000 0268 0000 and R553 018 000
0269 0000.
Attachments:
A. DPR-000104-2025 - Site Plan
B. DPR-000104-2025 - Narrative
TOWN OF HILTON HEAD ISLAND
Staff Report Memo
Page 49 of 58
UGTUGTUGTGAS
X
XXX
VAN
VAN
VAN
110'
PROPOSED BUILDING±47,000 SFFFE: 13.1'
PROPOSED RETAIL±1,500 SF
13121110090806
04B04A
02B02A01
VAN
TRASHCOMPACTOR
PROPOSEDPATIO±2,000 SF
PROPOSEDPATIO±600 SF
EVEV
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT70'
24'
FULL ACCESSENTRANCE/EXITROADWAY EASEMENT PERDEED BOOK 4184, PAGE 247
EXISTING MONUMENT SIGN
EXISTINGMONUMENTSIGN20' BUILDING SETBACK
20' BUILDING SETBACK
20' BUILDING SETBACK20' BUILDING SETBACK
FLOOD ZONEAE LIMITSFLOOD ZONEAE LIMITS
FLOOD ZONEX LIMITS
FLOOD ZONEX LIMITS
50'
30' BUILDING SETBACK
POPE AVE 100'R/W
OGTCW
SHEET NUMBERPROJECT NO.SCALE:DRAWN BY:DESIGNED BY:CHECKED BY:PROJECT:TITLE: No. DATEBY
DATE
Drawing name: K:\CHA_LDEV\019842 Brixmor\004 - Circle Center HHI\02 - DWG\PlanSheets\C2-00 - SITE PLAN.dwg C2-00 SITE PLAN Aug 12, 2025 11:39am by: Olivia.TiceThis document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
© 2025 KIMLEY-HORN AND ASSOCIATES, INC.1080 MORRISON DRIVE, SUITE 240CHARLESTON, SOUTH CAROLINA 29403PHONE (843) 737-6390WWW.KIMLEY-HORN.COMAS SHOWNCLIENT:
CERTIFICATE OF AUTHORIZATIONANDNo. C00166INCKIMLEY-HORNASSOCIATES,TUSONILAHCROAOGT REVISIONS0ISSUED FOR DPR REVIEW01/23/2025KHA1REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA2REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA3 04/30/202507/08/2025BRE RETAIL RESIDUAL CIRCLECENTER OWNERS LLC1003 HOLCOMB WOODS PARKWAY,ROSWELL, GA 30076PHONE: (770) 360-8429CIRCLE CENTER HHIREDEVELOPMENT70 POPE AVENUE, HILTON HEAD ISLAND, SC 29928
01984200401/23/2025
REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA08/12/2025
C2-00SITE PLAN - OVERALLNORTHSEE SHEET C2-01SEE SHEET C2-02
DEVELOPMENT SUMMARY:SITE SUMMARY:ZONING:CR (COLIGNY RESORT)OVERLAY ZONING DISTRICT:COR (CORRIDOR OVERLAY DISTRICT)LAND USE:SHOPPING CENTERFLOOD ZONES:X, X-SHADED, AEMAX DENSITY: N/AGROSS SITE AREA: 7.48 ACRESNET SITE AREA:7.48ACRESMAX IMPERVIOUS COVER: N/ACURRENT IMPERVIOUS AREA:5.77ACRESPROPOSED IMPERVIOUS AREA:5.54 ACRES (74%)PERVIOUS AREA:1.94 ACRES (26%)TOTAL DISTURBED AREA:4.5 ACRESBUILDING SETBACK*:FRONT:30 FTSIDE (NASSAU ST):20 FTSIDE (NORTH):20 FTBACK:20 FTMAX BUILDING HEIGHT:36 FT ALONG ADJACENT STREET SETBACK, 60 FT ONCE SETBACK ANGLE ATTAINEDPROPOSED BUILDING HEIGHT: 30'-8"*THE 30' SETBACK ALONG POPE AVE IS SHOWN, BUT IS NOT APPLICABLE DUE TOPARCEL SHAPE. THE 20' SETBACK ALONG NASSAU STREET IS SHOWN, BUT IS NOTAPPLICABLE DUE TO NASSAU STREET BEING WITHIN A ROADWAY EASEMENT.PROPOSED LAND USES & DENSITIES:EXISTING GROCERY STORE:44,993 SFPROPOSED GROCERY STORE:47,000 SFPROPOSED RETAIL:1,500 SFEXISTING SHOPPING CENTER TO REMAIN:20,500 SFTOTAL:69,000 SFPARKING SUMMARY:EXISTING PARKING TOTAL:259 SPACES (TOTAL)STANDARD (9'X18')173 SPACESCOMPACT78 SPACESPERVIOUS0 SPACESADA8 SPACESREQUIRED PARKING RATIO PER HHI:SHOPPING CENTER (1 SPACE/500 GFA):44 SPACESGROCERY STORE (1 SPACE/250 SF):188 SPACESTOTAL REQUIRED PARKING232 SPACESMAXIMUM ALLOWABLE PARKING (105%)244 SPACESPROPOSED PARKING TOTAL:251 SPACES (TOTAL)STANDARD (9.5' X 18')74 SPACESPERVIOUS (9.5' X 18')133 SPACESPERVIOUS COMPACT28 SPACESPERVIOUS ELECTRIC VEHICLE CHARGING2 SPACESADA10 SPACESVAN ADA4 SPACESBICYCLE PARKING SUMMARY:EXISTING BICYCLE PARKING:18 SPACES (TOTAL)REQUIRED BICYCLE PARKING:61 SPACES (TOTAL)PROPOSED BICYCLE PARKING:32 SPACES (TOTAL)**SUBSTITUTION OF NONCONFORMITIES (SUBNC-000139-2025) APPROVED ONFEBRUARY 12, 2025SITE NOTES:1.THE PROPOSED BUILDING INFORMATION SHOWN HEREON IS FROM ANELECTRONIC FILE PROVIDED BY HISCUTT & ASSOCIATES ARCHITECTURE,DATED 08/01/2024 AND IS FOR ILLUSTRATIVE PURPOSES ONLY. CONTRACTORSHALL REFERENCE ARCHITECTURAL PLANS FOR EXACT BUILDINGINFORMATION.2.EXISTING CONDITIONS SHOWN HEREON ARE FROM A SURVEY FILE PROVIDEDBY NANDINA INC. d.b.a. SEA ISLAND LAND SURVEY, INC., DATED 05/08/2024.3.ALL DIMENSIONS ARE FROM FACE OF CURB TO FACE OF CURB UNLESSOTHERWISE NOTED.4.SIDEWALK INSTALLED AGAINST BACK OF CURB SHALL BE INSTALLED PER THEPLAN AS MEASURED FROM THE BACK OF CURB.5.ALL SIGNAGE AND STRIPING MUST MEET THE LATEST REQUIREMENTS SETFORTH BY MUTCD, SCDOT, AND SOUTH CAROLINA STATE CODE.6.REFERENCE LANDSCAPE PLANS FOR ALL HARDSCAPE AND LANDSCAPEDETAILS AND SPECIFICATIONS.7.EV STALLS PROVIDED ARE TO BE ADA COMPLIANT AND SHOULD HAVE SIGNSTATING THEY ARE FOR ACTIVE EV CHARGING ONLY.8.PROPOSED LOCATION OF STORAGE TANK(S) AT THE SUBJECT SITE ARE NOTWITHIN 500 FEET OF ANY EXISTING COMMUNITY WATER SUPPLY WELL, NOTWITHIN 500 FEET OF ANY NON-TRANSIENT, NON-COMMUNITY WATER SUPPLYWELL, AND NOT WITHIN 100 FEET OF ANY OTHER EXISTING POTABLE WATERSUPPLY WELL.9.PAINT STRIPING IN ALL PARKING LOT AND PAVEMENT AREAS SHOULD BECONSTRUCTED WITH A PAINT PRODUCT THAT PROVIDES A HIGHSLIP-RESISTANT FINISH AND PREVENTS INDIVIDUALS FROM SLIPPING WHENSTEPPING ON THE STRIPING IN BOTH WET AND DRY CONDITIONS.10.TEMPORARY WORK ZONE TRAFFIC CONTROL DEVICES EMPLOYED ARE TO BECOMPLIANT WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
3
3
3
3
Page 50 of 58
UGTUGTUGTUGTUGTUGT
UGTGASGASGASGAS
XX
XXXXXXXX
VANVAN
VAN
110'
PROPOSED BUILDING±47,000 SFFFE: 13.1'PROPOSEDRETAIL±1,500 SF
VAN
TRASHCOMPACTOR
XX
PROPOSEDPATIO±2,000 SF
EVEV
5' SIDEWALK FLUSH WITHBACK OF EXISTING CURB
TYP.
TYP.
TYP.TYP.
TYP.
TYP.TYP. TYP.I
EEEEE
AA
DC
A
A GA
H
A
AA
J
B B
BB
B
KK
L L
BMO
O
G GP
K QTYP.
CONCRETEFLUME N
R
S
MAILBOXES TO BERELOCATED TOBUILDING FACE
UCONTRACTOR SHALLTIE INTO EXISTINGSIDEWALK
T TV
W
W
5'X5' TREEWELL, TYP. OF 2I
SIDEWALK TO HAVETURN DOWN EDGEWITH HANDRAIL
QTYP.
T
T
CONTRACTOR SHALL RESET/RESTRIPE MULTIUSEPATH TO RELOCATE STOP BAR, STOP SIGN,CONCRETE PAD, AND DETECTABLE WARNING TOTHE REVISED CURB LINE LOCATION
X
X
I RAMP, REFERENCEARCHITECTURAL DRAWINGSY
F
S SS
S SS
S S S
CURB ALONG FRONTSIDEWALK TO BE PAINTEDTRAFFIC YELLOW (TYP.)CURB ALONG FRONTSIDEWALK TO BE PAINTEDTRAFFIC YELLOW (TYP.)
TYP.B TYP.B
BTYP.
BTYP.
AA
AATYP.
TYP.
TYP.
BB BTYP.CC CC
PROPOSED 5'SIDEWALKPTYP.
DD
DD
DD
EE
L FFFFFF
R3'R50'R3'R5'
R3'R3'R3'R3'R3'
R3'R3'R3'R3'R3'R3'
R1.25'R1.25'
R3'R5'R10'R3'
R34'
R2.5'R2.5'R3'R3'R3'R3'R1.25'R1.25'R3'R3'R1.25'
R3'
R3'
R3'
R10'R5'
R1.25'
R3'R3'R3'
R1.25'
R3'R3'
R50'R15'
R5'R3'
R1.25'R1.25'R1.25'
R5'R3'R3'R5'R3'
R3'
R5'
9.5'20.41'
5'12'5'12'9.5'9.5'18' 9.5'18'12'12'
3'18'9.5'9.5'
12'12'12'5'12'12'5'
18'9.5'
9.5'
5'12'
18'9.5'9.5'18'
24'18'
5'12'5'
24'18'18'24'18'18'24'18'
18'18'24'18'9.5'
24'
20' BUILDING SETBACK
24'
12'
5'
24'70' 28'80'
GGGG
121056412 109210
63
43
7
4
139
PROPOSED ADA RAMP WITHDETECTABLE WARNING TOMATCH EXISTINGSTREETSCAPE, REFERENCESCDOT STANDARDDRAWING 720-951-11
CC CC CCCCCCCC CC
OGTCW
SHEET NUMBERPROJECT NO.SCALE:DRAWN BY:DESIGNED BY:CHECKED BY:PROJECT:TITLE: No. DATEBY
DATE
Drawing name: K:\CHA_LDEV\019842 Brixmor\004 - Circle Center HHI\02 - DWG\PlanSheets\C2-00 - SITE PLAN.dwg C2-01 SITE PLAN - WEST Aug 12, 2025 11:39am by: Olivia.TiceThis document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
© 2025 KIMLEY-HORN AND ASSOCIATES, INC.1080 MORRISON DRIVE, SUITE 240CHARLESTON, SOUTH CAROLINA 29403PHONE (843) 737-6390WWW.KIMLEY-HORN.COMAS SHOWNCLIENT:
CERTIFICATE OF AUTHORIZATIONANDNo. C00166INCKIMLEY-HORNASSOCIATES,TUSONILAHCROAOGT REVISIONS0ISSUED FOR DPR REVIEW01/23/2025KHA1REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA2REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA3 04/30/202507/08/2025BRE RETAIL RESIDUAL CIRCLECENTER OWNERS LLC1003 HOLCOMB WOODS PARKWAY,ROSWELL, GA 30076PHONE: (770) 360-8429CIRCLE CENTER HHIREDEVELOPMENT70 POPE AVENUE, HILTON HEAD ISLAND, SC 29928
01984200401/23/2025
REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA08/12/2025
C2-01SITE PLAN - WESTNORTHMATCHLINE -SEE SHEET C2-02
R3'
R3'
BUILDING SETBACK LINEHEAVY DUTY ASPHALT PAVEMENTPROPERTY LINEMILL AND OVERLAY EXISTING PAVEMENTSITE PLAN LEGEND:
HEAVY DUTY CONCRETE PAVEMENTPARKING COUNT10PERVIOUS PAVERSEXPOSED AGGREGATE DETECTABLEWARNINGABCDEFGHI
SITE KEYNOTE LEGEND:PROPOSED TIE INTO EXISTING CURBPROPOSED 6" STANDARD CURB AND GUTTERPARKING LOT STRIPING, 4" SOLID WHITE STRIPECURBSIDE PICKUP SPACE SIGN4" SOLID WHITE STRIPING, 2'-0" O.C. @ 45°ACCESSIBLE ADA PARKING STALL WITH ACCESSIBLE PARKINGSYMBOL AND SIGNPROPOSED CROSSWALKRECESSED TRUCK DOCK. REFERENCE ARCH PLANS FORDETAILS.JPROPOSED STOP BAR AND SIGNPROPOSED CART CORRALKPROPOSED UTILITY EQUIPMENT PADS, REFERENCEARCHITECTURAL PLANS BY OTHERSLACCESSIBLE ADA VAN PARKING STALL WITH ACCESSIBLEVAN PARKING SYMBOL AND SIGNNPROPOSED BIKE RACKSMPROPOSED DUMPSTER ENCLOSUREOPROPOSED BOLLARDSPPROPOSED LIGHT POLE (SEE LIGHTING PLAN FOR DETAILS)QPROPOSED ADA RAMP, REFERENCE DETAILSPROPOSED EV CHARGING PEDESTAL, REFERENCE ELECTRICALPLANS BY OTHERSRPROPOSED FLUSH CURBSEXTENTS OF ASPHALT PAVEMENT REPLACEMENTTPROPOSED COVERED MAINTENANCE CORRIDOR, REFERENCEARCHITECTURAL PLANSU2,000 GALLON ABOVE GROUND PROPANE TANKVPROPOSED TREE WELL WITH WALLS, REFERENCE GRADINGPLANWPROPOSED FIRE RISER ROOMXGREASE WASTE BARREL PADYPROPOSED ROLLED CURBZPROPOSED EDGE OF PAVEMENT. NO PROPOSED CURB ANDGUTTERAABBPROPOSED 6" STANDARD CURBCCRETURN CURB RAMP DETECTABLE WARNING (SEE SHEET C6-20FOR DETAIL)DDPROPOSED PEDESTRIAN STOP SIGNEEPROPOSED ONE WAY SIGNFFPROPOSED CONCRETE WHEEL STOPSGGPROPOSED R7-113 "NO PARKING EXCEPT WHILE CHARGINGSIGN" (SEE SHEET C6-01)
3
3
3
3
3
3
3
3
3
3
Page 51 of 58
PROPOSEDPATIO±600 SF
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT
TYP.TYP.
TYP.TYP.
E
A A
A
A
A
A
C G
IBQTYP.
EXISTINGMONUMENTSIGNEXISTINGMONUMENT SIGN
FULL ACCESSENTRANCE/EXIT
NASSAU STREET
CONTRACTOR SHALL RESET/RESTRIPE MULTIUSEPATH TO RELOCATE STOP BAR, STOP SIGN,CONCRETE PAD, AND DETECTABLE WARNING TOTHE REVISED CURB LINE LOCATIONCONTRACTOR SHALL EXTEND THE EXISTINGCROSSWALK TO THE NEW CURB LINE LOCATION
NTYP.GPROPOSED ADA RAMP WITHDETECTABLE WARNING TO MATCHEXISTING STREETSCAPE,REFERENCE SCDOT STANDARDDRAWING 720-981-36
Z
Z
Z
TRANSITION FROM FULLHEIGHT CURB AND GUTTERTO ROLL CURB OVER 3', TYP.
PROPOSED ADA RAMP WITHDETECTABLE WARNING TO MATCHEXISTING STREETSCAPE,REFERENCE SCDOT STANDARDDRAWING 720-951-11R3'R3'R3'R3'R3'R3'R8'R14.5'R8'R14.5'R3'R3'R10'R3'R5'R3'
R3'R3'
R5'R3' R3'R5'R5'R3'R3'R5'R3'R3'R12'R3'
R5'R5'
R3'R10'R3'R3'R3'R3'R3'R3'
R2'R30'
R5'R3'R3'
R50'
9.5'9.5'14'
9.5'18'
12'11'
24'
14'
18'24'18'
9.5'18'26'
18'9.5'24'9.5'15'
18'24'18'9.5'9.5'9.5'9.5'18'24'18' 18'24'18'9.5'9.5'
24'
9.5'
9.62'21.07'18'18'
20' BUILDING SETBACK
20' BUILDING SETBACK
8'
30' BUILDING SETBACK
1212
7
81212134865
313 7 81212
CONTRACTOR SHALL MILL AND OVERLAY THEEXISTING PAVEMENT TO THE NASSAU STREETLANE LINE
CC
OGTCW
SHEET NUMBERPROJECT NO.SCALE:DRAWN BY:DESIGNED BY:CHECKED BY:PROJECT:TITLE: No. DATEBY
DATE
Drawing name: K:\CHA_LDEV\019842 Brixmor\004 - Circle Center HHI\02 - DWG\PlanSheets\C2-00 - SITE PLAN.dwg C2-02 SITE PLAN - EAST Aug 12, 2025 11:39am by: Olivia.TiceThis document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.
© 2025 KIMLEY-HORN AND ASSOCIATES, INC.1080 MORRISON DRIVE, SUITE 240CHARLESTON, SOUTH CAROLINA 29403PHONE (843) 737-6390WWW.KIMLEY-HORN.COMAS SHOWNCLIENT:
CERTIFICATE OF AUTHORIZATIONANDNo. C00166INCKIMLEY-HORNASSOCIATES,TUSONILAHCROAOGT REVISIONS0ISSUED FOR DPR REVIEW01/23/2025KHA1REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA2REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA3 04/30/202507/08/2025BRE RETAIL RESIDUAL CIRCLECENTER OWNERS LLC1003 HOLCOMB WOODS PARKWAY,ROSWELL, GA 30076PHONE: (770) 360-8429CIRCLE CENTER HHIREDEVELOPMENT70 POPE AVENUE, HILTON HEAD ISLAND, SC 29928
01984200401/23/2025
REVISED PER TOWN OF HILTON HEAD DPR COMMENTSKHA08/12/2025
C2-02SITE PLAN - EASTNORTH
MATCHLINE -SEE SHEET C2-01
BUILDING SETBACK LINEHEAVY DUTY ASPHALT PAVEMENTPROPERTY LINEMILL AND OVERLAY EXISTING PAVEMENTSITE PLAN LEGEND:
HEAVY DUTY CONCRETE PAVEMENTPARKING COUNT10PERVIOUS PAVERSEXPOSED AGGREGATE DETECTABLEWARNINGABCDEFGHI
SITE KEYNOTE LEGEND:PROPOSED TIE INTO EXISTING CURBPROPOSED 6" STANDARD CURB AND GUTTERPARKING LOT STRIPING, 4" SOLID WHITE STRIPECURBSIDE PICKUP SPACE SIGN4" SOLID WHITE STRIPING, 2'-0" O.C. @ 45°ACCESSIBLE ADA PARKING STALL WITH ACCESSIBLE PARKINGSYMBOL AND SIGNPROPOSED CROSSWALKRECESSED TRUCK DOCK. REFERENCE ARCH PLANS FORDETAILS.JPROPOSED STOP BAR AND SIGNPROPOSED CART CORRALKPROPOSED UTILITY EQUIPMENT PADS, REFERENCEARCHITECTURAL PLANS BY OTHERSLACCESSIBLE ADA VAN PARKING STALL WITH ACCESSIBLEVAN PARKING SYMBOL AND SIGNNPROPOSED BIKE RACKSMPROPOSED DUMPSTER ENCLOSUREOPROPOSED BOLLARDSPPROPOSED LIGHT POLE (SEE LIGHTING PLAN FOR DETAILS)QPROPOSED ADA RAMP, REFERENCE DETAILSPROPOSED EV CHARGING PEDESTAL, REFERENCE ELECTRICALPLANS BY OTHERSRPROPOSED FLUSH CURBSEXTENTS OF ASPHALT PAVEMENT REPLACEMENTTPROPOSED COVERED MAINTENANCE CORRIDOR, REFERENCEARCHITECTURAL PLANSU2,000 GALLON ABOVE GROUND PROPANE TANKVPROPOSED TREE WELL WITH WALLS, REFERENCE GRADINGPLANWPROPOSED FIRE RISER ROOMXGREASE WASTE BARREL PADYPROPOSED ROLLED CURBZPROPOSED EDGE OF PAVEMENT. NO PROPOSED CURB ANDGUTTERAABBPROPOSED 6" STANDARD CURBCCRETURN CURB RAMP DETECTABLE WARNING (SEE SHEET C6-20FOR DETAIL)DDPROPOSED PEDESTRIAN STOP SIGNEEPROPOSED ONE WAY SIGNFFPROPOSED CONCRETE WHEEL STOPSGGPROPOSED R7-113 "NO PARKING EXCEPT WHILE CHARGINGSIGN" (SEE SHEET C6-01)
3
3
Page 52 of 58
Page 1
kimley-horn.com 1080 Morrison Drive, Suite 240, Charleston, SC 29403 (843) 737-6390
MEMORANDUM
To: Town of Hilton Head Community Development Department
One Town Center Court, Hilton Head Island, SC 29928
From: Casey Warfield
Kimley-Horn and Associates, Inc.
Date: 08/28/2025
Subject: Circle Center – Planning Commission Narrative
Planning Commission Narrative:
Kimley-Horn & Associates Inc. is submitting the following Project Narrative on behalf of BRE Retail
Residual Circle Center Owners LLC (Owner/Developer), for a proposed commercial redevelopment
on approximately 7.5 acres. The project site, including the parcels with tax map numbers R553-018-
000-0268 and R553-018-000-0269-0000, is zoned Coligny Resort within the jurisdiction of the Town
of Hilton Head, Beaufort County. The commercial shopping center is located along Pope Avenue and
Nassau Street. The existing developed shopping center contains 13 separate units and 259 parking
spaces. This is not a multi-phase project. A pre-application meeting was held on March 4, 2024
(PAPP-000252-2024), a Substitution of Nonconformities for the site was issued on February 12,
2025, and final DRB approval was provided on August 26, 2025.
The proposed redevelopment of the Circle Center shopping center consists of upgrades to the
existing center façade, replacement and expansion of the existing grocery store, and associated
parking and utility infrastructure improvements. The parking improvements within the front parking
area are intended to update the existing parking spaces and drive aisle widths in order to be better
aligned with best practices for the grocery store customer needs. The proposed 1-story (with
mezzanine) ±47,000 sf grocer and ±1,500 sf retail result in an increase of ±3,507 sf of building area.
The proposed improvements approximately decrease impervious area by ±0.2 acre.
The Owner accepts and retains maintenance responsibility of all proposed improvements on site.
Very truly yours;
Kimley-Horn and Associates, Inc.
Casey Warfield, P.E.
Casey.Warfield@kimley-horn.com
Page 53 of 58
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TO: Planning Commission
FROM:
VIA:
Brian Eber, Principal Planner
Trey Lowe, Development Services Program Manager
CC: Shawn Leininger, Deputy Town Manager, Interim LMO Official
DATE: September 17, 2025
SUBJECT: James Atkins of Court Atkins Group is proposing the redevelopment of 2
Tanglewood for Multifamily use. The subject property is identified as Beaufort
County Tax Map Parcel R553 018 000 0330 0000.
Town Staff continuously looks for ways to improve its processes. One recent change
implemented by Staff for the Development Review Program is to require all Major
Development Plan Review applications for new commercial development and Major
Subdivision applications to be shared with the Planning Commission. The applications will be
presented by Staff for information purposes only. This will provide a way for the Planning
Commission and the general public to be made aware of all new developments being proposed
on Hilton Head Island.
There is one new Major Development Plan Review application ready to be shared with the
Planning Commission – DPR-000518-2025 - 2 Tanglewood., a redevelopment of a hotel
commissary building into a 20-unit Multifamily structure. The subject property is zoned Resort
Development (RD) District and is located within the Corridor Overlay, and is identified on
Beaufort County Tax Map 18 as R553 018 000 0330 0000.
Attachments:
A. DPR-000518-2025 - Site Plans
B. DPR-000518-2025 – Narrative
TOWN OF HILTON HEAD ISLAND
Staff Report Memo
Page 54 of 58
C-8SITE IMPROVEMENT PLAN
HORIZONTAL SCALE 1" = 20'PLAN
SHEET NO.SHEET NAMEDATE
ENGINEER OF RECORDNATHAN STURRE, P.E.SC PE# 40266PO Box 2227Bluffton, SC 29910843.929.9432
HORIZ. DATUM:STATE PLANE, NAD83VERT. DATUM: NAVD88
PROJECT:2 TANGLEWOOD DRR553-018-000-0230-0000
08/05/2025
PREPARED FOR:TANGLWOOD CAPITAL
SURVEYORPATRICK BOYLAN, PLSBOYLAN SURVEYINGSC PLS#190101446 AUDUBON DRIVE SEAIKEN, SC 29801803.480.4495
08/05/2025
Page 55 of 58
DPR Narrative
Project Name:
Parcel: 2 Tanglewood
Location: 2 Tanglewood Drive
Hilton Head Island, SC 29928
Parcel: R553 018 000 0330 0000
Owner: Tanglewood Capital
2140 Vadalabene Drive
Maryville, IL 62062
Email – corey@crevocapital.com
Cell – (618) 972-4334
Project Description:
Tanglewood Capital is proposing the construction of a twenty (20) unit interval occupancy resort at
2 Tanglewood Drive. The property is in the Resort D evelopment (RD) zoning district and COR-RD
overlay district. The 1.25-acre lot currently houses a resort development, which will be demolished
as part of this effort. The proposed improvements i nclude the removal of the existing site
improvements, including all structures, drive aisle s, sidewalks, steps, patios, landings, air
conditioning units, etc. Proposed improvements include the construction of the new 3-story resort
development, parking, pervious paver drive aisles, concrete sidewalks, and associated
infrastructure to accommodate the development.
The proposed project will disturb approximately 0.9 acres and will decrease the total impervious
area of the lot from 41% to 39%, not including BMP areas or pervious roadways. Runoff from
existing and proposed conditions discharges to an onsite detention pond which ultimately outfalls
to Broad Creek through the Sea Pines canal system.
Site Description
The site is generally bordered to the north by the Holiday Inn property on parcel R553 018 000 0230
0000, to the east by the Continental Club on parcel R553 018 000 004B 0000, to the south by the
South Forest Beach Drive (State Road S-243), and to the west by Tanglewood Drive (Town owned
road).
Zoning District:
Resort Development (RD)
Overlay District:
Corridor Overlay District – RD
Page 56 of 58
Wetlands:
There are no jurisdictional or non-jurisdictional wetlands onsite.
Protected Species
The site is currently developed and there are no known protected species at the site.
Proposed Structure
The proposed three-story structure will house 20 interval occupancy units including four (4) 2-
bedroom units, six (6) 3-bedroom units, and ten (10) 4-bedroom units. Below is a summary of the
proposed unit count and square footages.
• 2 Bedroom – 4 units, 1,196 sf each
• 3-Bedroom – 6 units, 1,500 sf each
• 4-Bedroom – 10 units, 1,800 sf each
Vehicle Access:
The site is currently accessed through two existing curb cuts along Tanglewood Drive (Town owned
road). The improved site will retain the two existing curb cuts. The northern curb cut will be a one-
way access in, and the southern curb cut will be a one-way access out.
Site Parking:
The post-development site requires 30 parking space s per LMO Section 16-3-105.L.2, interval
occupancy. The site offers 44 spaces to accommodate proposed 3- and 4-bedroom units where
more than 1.5 cars per unit are expected. 42 of the proposed spaces are located under the proposed
structures, with the remaining 2 spaces located on the northern drive aisle in.
Fire & Rescue Access:
The fire department will have vehicular access arou nd the structure through the new drive aisle
and new gravel fire drive on the north side of the property. The fire department can access the
remainder of the site from Tanglewood Drive.
Grading & Stormwater Management:
All runoff from the existing and proposed site is r outed to an onsite detention basin on the north
side of the property, which ultimately outfalls to Broad Creek through the Sea Pines canal system.
As the site reduces overall impervious area from the developed site and reduces the curve number
from the site using brick-paver drive aisles, no additional water quantity or quality control measures
are proposed. The proposed pervious drive aisles do provide approximately 1,216 cubic feet of
additional retention volume upstream of the existing wet detention basin.
Page 57 of 58
Underground Utilities:
Existing water and sewer connections will be utilized for the proposed structure. Water and sewer
services for the site are provided through South Island PSD.
The site has ample availability of power and telecommunications.
Trash Receptacles & Enclosures:
A community dumpster is proposed near the entrance to the parking garage under the building.
Maintenance Responsibilities
The property will be retained by Tanglewood Capital who will be the responsible party for all site
maintenance.
Site Lighting
Site lighting alternatives are currently being explored, and additional clarity will be provided as
the project progresses through the DPR process. All proposed site lighting will conform to LMO
standards.