City of Isle of Palms
Beach Preservation Committee
Beach Management
Alternatives Analysis – Findings Discussion
September 2, 2026
Page 2
◆ Recap of Study Baseline Definition
◆ Summary of Assumed Initial Conditions
▪ Volume Change Rates
▪ 2026 Project
◆ Alternatives
◆ Cost Analysis - Assumptions and Results
◆ Future Management
Outline
Page 3
◆ Baseline Development:
▪ Assumed to represent the primary dune crest of
minimum beach position
▪ Identified as the seaward-most occurrence of:
• 50-ft offset from seaward edge of development,
• 2017 SCDES Baseline, or
• Seaward edge of 2026 dune, where constructed.
Alternatives Study Baseline Definition
Page 4
Alternatives Study Baseline Definition
Development Line
(estimated)
2017 SCDES
2026 Dune
50-ft
(min.)
~175 to 200-ft
The “baseline” is assumed to be the primary
dune crest that is identified by the seaward
most occurrence of;
(1) 50-ft seaward of development line,
(2) the 2017 SCDES line, or
(3) the seaward edge of the 2026
constructed dune.
MHHW
Page 5
Alternatives Study Baseline Definition
Study Baseline
Seaward Edge of Infrastructure (typ.)
50-ft Seaward of Seaward Edge of Infrastructure (typ.)
2017 SCDES Baseline
2026 Dune
Beach Monitoring
Stations
Atlantic Ocean
Breach
Inlet
Page 6
Alternatives Study Baseline Definition
Seaward Edge of Infrastructure (typ.)
Study Baseline
50-ft Seaward of Seaward Edge of Infrastructure (typ.)
2017 SCDES
Baseline
2026 Dune
Beach Monitoring
Stations
Page 7
Page 7
Initial Conditions
Page 8
Volume Change Rates
“Low Rate”
Survey Period: April 2018 – September 2024
“High Rate”
Survey Period: July 2021 – September 2024
Note: Volume change rates were derived from volume data reported by CSE.
Page 9
Volume Change Rates (Reach 1)
Note: Volume change rates were derived from volume data reported by CSE.
Volume change data used
for Alternatives Analysis
Page 10
Volume Change Rates (Reach 5)
Note: Volume change rates were derived from volume data reported by CSE.
Volume change data used
for Alternatives Analysis
Page 11
NET Volume Change Rates (Reaches 1-6)
Note: Volume change rates were derived from volume data reported by CSE.
April 2018 -
September 2024
("low")
July 2021 -
September 2024
("high")
Reach 1 4,000 -36,800 -96,200
Reach 2 5,000 -22,300 -32,900
Reach 3 5,000 20,500 25,600
Reach 4 8,200 82,000 53,200
Reach 5 5,800 -141,900 -108,400
Reach 6 4,800 -102,200 -95,700
Total All Reaches 32,800 -200,700 -254,400
Total Reaches 1, 2, 5, & 6 19,600 -303,200 -333,200
Reach Length (ft)
Annualized Volume Change Rate
(cy/yr)
Reach
Page 12
2026 Project Volumes
Based on June. 2026 Survey
800,700 cy
799,100 cy 880,100 cy
Page 13
Post-2026 Beach Conditions (Projected)
This is the starting condition for
the alternatives analysis
Based on June. 2026 Survey
Page 14
Page 14
Alternatives
Page 15
Alternatives
◆ No-Action (“Do Nothing”)
◆ Beach Renourishment Only (Low and High Sand Loss Rates)
▪ Scheduled (5-yr, 7-yr, and 10-yr intervals)
▪ Triggered (Interval Required to Protect Baseline Condition)
◆ USACE Breach Inlet ICWW Maintenance – Reach 1 (150,000 cy every 3 yrs)
◆ Dewees Inlet Shoal Management – Reaches 5 and 6 (700,000 cy every 7 yrs)
◆ Terminal Groin (R1)
◆ T-Groins/Breakwaters and/or Geotubes (R5/R6) – Reaches 5 and 6 (last line of defense)
Page 16
No Action (Low Sand Loss Rate)
Note: Does not
consider
possible future
AICWW beach
disposal.
Page 17
No Action (High Sand Loss Rate)
Note: Does not
consider
possible future
AICWW beach
disposal.
Page 18
2026 Project Performance
Assuming recent beach change conditions continue,
the 2026 Project is expected to maintain beach
conditions seaward of the entire assumed beach
management Baseline for no more than about 3 years.
Page 19
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
Volume
Lost
Seaward of
Baseline
(cy)
Volume
Lost
Landward of
Baseline
(cy)
Total
Volume
Lost
(cy)
1 122,300 61,500 183,800 245,300 158,300 322,800 481,100 803,900
2 111,400 0 111,400 111,400 164,300 0 164,300 164,300
3 0 0 0 0 0 0 0 0
4 0 0 0 0 43,400 0 43,400 43,400
5 664,200 45,000 709,200 754,200 564,800 28,500 593,300 621,800
6 503,700 7,500 511,200 518,700 591,100 126,500 717,600 844,100
Total 1,401,600 114,000 1,515,600 1,629,600 1,521,900 477,800 1,999,700 2,477,500
Predicted Preformance of 2026 Project after 5 Years [D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Predicted Preformance of 2026 Project after 5 Years
Reach
April 2018 - September 2024
("Low" Erosion Rate)
July 2021 - September 2024
("High" Erosion Rate)
5-Year Project Interval after Completion of 2026 Project
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Renourishment - Scheduled
◆ Required Future Volume Following Completion of 2026 Project
▪ Restore Minimum AND Maintain Baseline Beach Condition
▪ Future Advance Fill required for 5-, 7-, and 10-year renourishment intervals
Page 20
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
1 158,300 209,200 367,500 576,700 158,300 804,000 962,300 1,766,300
2 222,800 0 222,800 222,800 262,600 66,000 328,600 394,600
3 0 0 0 0 0 0 0 0
4 0 0 0 0 86,800 0 86,800 86,800
5 885,300 533,300 1,418,600 1,951,900 741,500 445,000 1,186,500 1,631,500
6 865,800 156,600 1,022,400 1,179,000 761,700 673,600 1,435,300 2,108,900
Total 2,132,200 899,100 3,031,300 3,930,400 2,010,900 1,988,600 3,999,500 5,988,100
Predicted Preformance of 2026 Project after 10 Years [D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Predicted Preformance of 2026 Project after 10 Years
10-Year Project Interval after Completion of 2026 Project
April 2018 - September 2024
("Low" Erosion Rate)
July 2021 - September 2024
("High" Erosion Rate)
Reach
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
1 146,300 110,900 257,200 368,100 158,300 515,300 673,600 1,188,900
2 155,900 0 155,900 155,900 218,900 11,000 229,900 240,900
3 0 0 0 0 0 0 0 0
4 0 0 0 0 60,800 0 60,800 60,800
5 816,100 176,900 993,000 1,169,900 675,900 154,700 830,600 985,300
6 674,300 41,400 715,700 757,100 715,100 289,600 1,004,700 1,294,300
Total 1,792,600 329,200 2,121,800 2,451,000 1,829,000 970,600 2,799,600 3,770,200
Predicted Preformance of 2026 Project after 7 Years [D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
April 2018 - September 2024
("Low" Erosion Rate)
7-Year Project Interval after Completion of 2026 Project
July 2021 - September 2024
("High" Erosion Rate)
Reach
Predicted Preformance of 2026 Project after 7 Years
Renourishment - Scheduled
Page 21
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
1 97,300 13,000 110,300 123,300 88,100 8,100 96,200 104,300
2 66,800 0 66,800 66,800 32,900 0 32,900 32,900
3 0 0 0 0 0 0 0 0
4 0 0 0 0 8,700 0 8,700 8,700
5 418,500 7,100 425,600 432,700 118,700 0 118,700 118,700
6 306,700 0 306,700 306,700 141,700 1,900 143,600 145,500
Total 889,300 20,100 909,400 929,500 390,100 10,000 400,100 410,100
Predicted Preformance of 2026 Project after 3 Years Predicted Preformance of 2026 Project after 1 Year[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Trigger - 3 Years Until Erosion into Baseline
[Between Stations 12+00 and 30+00]
Trigger - 1 Year Until Erosion into Baseline
[Between Stations 12+00 and 30+00]
Reach
April 2018 - September 2024
("Low" Erosion Rate)
July 2021 - September 2024
("High" Erosion Rate)
Renourishment - Triggered
◆ Implement renourishment on scheduled intervals regardless of beach
condition between intervals
Page 22
Breach Inlet AICWW Beach Disposal
Note: Concept only.
Goals:
• Beneficial use of available dredge material
• Supplemental sand source for Reaches 1 and 2
• Extend time between required renourishments
• Reduce sand need from offshore borrow areas
Assumptions:
• 3 yr interval (more or less)
• ~150,000 cy/event (equivalent to ~50,000 cy/yr)
• All material placed in Reaches 1 and 2
• Available material is suitable for beach placement
• Material provided at no cost to the City
Reach 2Reach 1
Atlantic Intracoastal Waterway (AICWW)
Page 23
Dewees Inlet Shoal Management
Note: Concept only.
Goals:
• Collect ebb shoal sand before migrating shoals
approach IOP shoreline
• Place sand along Reaches 5 and 6
• Reduce impacts of future shoal attachments
• Extend time between required renourishments
• Reduce sand need from offshore borrow areas
Assumptions:
• 7 yr interval
• 700,000 cy/event (equivalent to 100,000 cy/yr)
• All material placed in Reaches 5 and 6
Page 24
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Volume Available
from AICWW
(Reaches 1&2)
and Dewees Shoal
(Reaches 5&6)
(cy)
Sand Volume
Needed from
Offshore for Full
Restoration and
Maintenance
(cy)
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Volume Available
from AICWW
(Reaches 1&2)
and Dewees Shoal
(Reaches 5&6)
(cy)
Sand Volume
Needed from
Offshore for Full
Restoration and
Maintenance
(cy)
1 122,300 61,500 183,800 245,300 106,700 158,300 322,800 481,100 803,900 718,200
2 111,400 0 111,400 111,400 0 164,300 0 164,300 164,300 0
3 0 0 0 0 0 0 0 0 0 0 0 0
4 0 0 0 0 0 0 43,400 0 43,400 43,400 0 43,400
5 664,200 45,000 709,200 754,200 504,200 564,800 28,500 593,300 621,800 371,800
6 503,700 7,500 511,200 518,700 268,700 591,100 126,500 717,600 844,100 594,100
Total 1,401,600 114,000 1,515,600 1,629,600 750,000 879,600 1,521,900 477,800 1,999,700 2,477,500 750,000 1,727,500
5-Year Project Interval after Completion of 2026 Project
Reach
April 2018 - September 2024
("Low" Erosion Rate)
July 2021 - September 2024
("High" Erosion Rate)
250,000
500,000
250,000
500,000
Renourishment – with AICWW and Shoal Mgt Sand
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Volume Available
from AICWW
(Reaches 1&2)
and Dewees Shoal
(Reaches 5&6)
(cy)
Sand Volume
Needed from
Offshore for Full
Restoration and
Maintenance
(cy)
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Volume Available
from AICWW
(Reaches 1&2)
and Dewees Shoal
(Reaches 5&6)
(cy)
Sand Volume
Needed from
Offshore for Full
Restoration and
Maintenance
(cy)
1 146,300 110,900 257,200 368,100 174,000 158,300 515,300 673,600 1,188,900 1,079,800
2 155,900 0 155,900 155,900 0 218,900 11,000 229,900 240,900 0
3 0 0 0 0 0 0 0 0 0 0 0 0
4 0 0 0 0 0 0 60,800 0 60,800 60,800 0 60,800
5 816,100 176,900 993,000 1,169,900 819,900 675,900 154,700 830,600 985,300 635,300
6 674,300 41,400 715,700 757,100 407,100 715,100 289,600 1,004,700 1,294,300 944,300
Total 1,792,600 329,200 2,121,800 2,451,000 1,050,000 1,401,000 1,829,000 970,600 2,799,600 3,770,200 1,050,000 2,720,200
Reach
April 2018 - September 2024
("Low" Erosion Rate)
July 2021 - September 2024
("High" Erosion Rate)
700,000
350,000
700,000
350,000
7-Year Project Interval after Completion of 2026 Project
Page 25
Renourishment – with AICWW and Shoal Mgt Sand
◆ Demand on offshore sand can be reduced with use of beach compatible sand
from AICWW and Dewees Inlet Shoal Management.
◆ Proposed sand volume from AICWW beach disposal MAY NOT be sufficient to
maintain Baseline conditions along Reach 1 without sand from offshore.
◆ Available volumes and schedule will need to be confirmed.
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Volume Available
from AICWW
(Reaches 1&2)
and Dewees Shoal
(Reaches 5&6)
(cy)
Sand Volume
Needed from
Offshore for Full
Restoration and
Maintenance
(cy)
[A]
Volume
Lost
Seaward of
Baseline
(cy)
[B]
Volume
Lost
Landward of
Baseline
(cy)
[C = A + B]
Total
Volume
Lost
(cy)
[D = C + B]
Future Volume
Required to
Restore and
Maintain Beach
Seaward of
Baseline (cy)
Volume Available
from AICWW
(Reaches 1&2)
and Dewees Shoal
(Reaches 5&6)
(cy)
Sand Volume
Needed from
Offshore for Full
Restoration and
Maintenance
(cy)
1 158,300 209,200 367,500 576,700 299,500 158,300 804,000 962,300 1,766,300 1,660,900
2 222,800 0 222,800 222,800 0 262,600 66,000 328,600 394,600 0
3 0 0 0 0 0 0 0 0 0 0 0 0
4 0 0 0 0 0 0 86,800 0 86,800 86,800 0 86,800
5 885,300 533,300 1,418,600 1,951,900 1,451,900 741,500 445,000 1,186,500 1,631,500 1,131,500
6 865,800 156,600 1,022,400 1,179,000 679,000 761,700 673,600 1,435,300 2,108,900 1,608,900
Total 2,132,200 899,100 3,031,300 3,930,400 1,500,000 2,430,400 2,010,900 1,988,600 3,999,500 5,988,100 1,500,000 4,488,100
10-Year Project Interval after Completion of 2026 Project
Reach
April 2018 - September 2024
("Low" Erosion Rate)
July 2021 - September 2024
("High" Erosion Rate)
500,000
1,000,000
500,000
1,000,000
Page 26
Renourishment with Structures
◆ Terminal Groin (Reach 1)
Page 27
7-Year Condition
Volume
Loss
Beyond
Baseline
(typ.)
Post-Project Beach
Volume Performance
Relative to Baseline
“Low” rate (2018-2024)
“High” rate (2021-2024)
Anticipated Sand Loss Landward of Baseline (Reach 1)
Page 28
Reach 1 Reach 2
6th Avenue
Area of Highest Erosion
and Volume Loss (typ.)
Beach Monitoring
Stations
Pier
14th Avenue
Anticipated Sand Loss Landward of Baseline (Reach 1)
Page 29
Reach 1 Reach 2
6th Avenue
Terminal Groin
(~1,200 ft)
Concept shoreline
response
14th Avenue
Pier
Goals:
• Reduce sand loss from the southern end
of the island
• Anchor shoreline position away from
Baseline
• Extend time between required
renourishment events
• Reduce demand on sand from offshore
borrow areas
Assumptions:
• ~1,200 feet long
(most of structure to be buried)
• ~15,000 tons of rock
(with stone-filled mattress foundation)
• Reduces sand loss:
• Reach 1 by 50%
• Reach 2 by 25%
Terminal Groin (Reach 1)
Note: Structures shown are conceptual and do not represent a final design. Quantities are assumed.
Page 30
Renourishment with Structures
◆ Terminal Groin (Reach 1)
◆ T-Groins/Breakwaters (Reaches 5 and 6)
Page 31
7-Year Condition
Volume
Loss
Beyond
Baseline
(typ.)
Post-Project Beach
Volume Performance
Relative to Baseline
“Low” rate (2018-2024)
“High” rate (2021-2024)
Anticipated Sand Loss Landward of Baseline (Reaches 5 &6)
Page 32
Area of
Highest
Erosion
(typ.)
Wild Dunes Resort
Anticipated Sand Loss Landward of Baseline (Reaches 5 &6)
Page 33
T-Groins and Breakwaters (Reaches 5 and 6)
Breakwater
(typ.)
T-groin
(typ.)
Wild Dunes Resort
Note: Structures shown are conceptual and do not represent a final design. Quantities are assumed.
Goals:
• Provide last line of defense to
upland
• Anchor shoreline position at
Baseline under most eroded
conditions
• Maintain recreational beach
seaward of Baseline
Note: Not intended to reduce sand loss rate
from renourishment but may allow for
smaller fill volumes and longer periods
between renourishments
Assumptions:
• Reach 5 (5, T-groins and 2, breakwaters)
• Reach 6 (2, T-groins and 2, breakwaters)
• T-Groin = 2,800 tons with foundation
• Breakwater = 1,600 tons with foundation
Page 34
Renourishment with Structures
◆ Terminal Groin (Reach 1)
◆ T-Groins/Breakwaters (Reaches 5 and 6)
◆ Sand filled Geotubes (Reaches 5 and 6)
Page 35
Geotubes (Reaches 5 and 6)
Geotubes
(typ.)
Wild Dunes Resort
Note: Structures shown are conceptual and do not represent a final design. Quantities are assumed.
Goals:
• Provide last line of defense to
upland
• Anchor shoreline position at
Baseline under most eroded
conditions
Note: Not intended to maintain recreational
beach seaward of Baseline
Assumptions:
• Reach 5 = 3,300 feet
• Reach 6 = 1,700 feet
Page 36
Beach Management Elements Summary
Note: Concept. Does not represent a final design.
Renourishment
Renourishment
AICWW Beach Disposal
Dewees Inlet Shoal Mgt
T-Groins/
Breakwaters
or Geotubes
Offshore Borrow Areas
Reach 2Reach 1
Reach 5
Reach 6
Terminal Groin
Page 37
Known Offshore Sand Sources
Sand Availability: no more than
~25 Mcy (pre-2026) (ref: CSE)
◆ Depleted: A, B, C, F
◆ Partially Depleted: E
◆ Available: D, G
◆ 2026 Project: Area 1
◆ Future: Area 2-5
Sand Demand:
Planning
Period
(yrs)
Total
Sand
Demand
(cy)
Total Sand
Demand with
20%
Contingency
(cy)
Low 303,000 50 15,150,000 18,200,000
High 400,000 50 20,000,000 24,000,000
Annual
Sand Loss
(cy/yr)
Page 38
◆ Offshore sand for continued renourishment
▪ Mob/Demob = $1.5M
▪ Sand = $9/cy (ref: recent Marinex proposal to City of IOP)
▪ As needed
◆ Dewees Inlet Shoal Management
▪ Mob/Demob = $1.0M (assumed)
▪ Sand = $7.5/cy (assumed)
▪ 700,000 cy every 7 years (equivalent to 100,000 cy/yr – Reaches 5 and 6 only)
◆ Breach Inlet AICWW Beach Disposal
▪ No cost to the City of IOP (ref: communications between USACE and City of IOP)
▪ 150,000 cy every 3 years (equivalent to 50,000 cy/yr – Reaches 1 and 2 only)
Cost Assumptions - Sand
Page 39
◆ Rock - Effective unit cost = $275/ton (recent market conditions in SC & NC)
▪ Terminal Groin (Reach 1) ~$4.5 to $5.5M
▪ T-Groins/Breakwaters (Reach 5) ~$4 to $5M
▪ T-Groins/Breakwaters (Reach 6) ~$3.5 to $4M
◆ Geotubes – Effective unit cost = $570/ft (recent market conditions in NC)
Cost Assumptions - Structures
Page 40
◆ Planning, Engineering, and Design (PED) = 5% of construction cost
◆ Const. Engr and Inspection (CEI) = 7% of construction cost
◆ Contingency = 0% (Note: The assumed costs are based upon proposals from industry and recent market examples, so no
contingency is applied to costs.)
◆ Planning period (n) = 50 years
◆ Discount rate (i) = 3.25% (2026 USACE planning guidance)
Cost Assumptions - Other
Page 41
Cost Summary (preliminary)
Scheduled Renourishment (offshore sand sources only; baseline condition rebuilt at time of each event)
Triggered Renourishment (offshore sand sources only)
Future
Renourish-
ment
Event
Volume
(cy)
Future
Renourish-
ment
Event
Cost
($)
Supplemental
Volume from
Dewees Inlet
and AICWW
(cy)
Dewees Inlet
Shoal Mgt
($)
Breach Inlet
AICWW Beach
Disposal
($)
Terminal
Groin
(Rch 1)
($)
Average
Annual
Equivalent
Cost
(AAEC)
($/yr)
5-Yr Interval (Low) 1,629,600 18,106,368$ - -$ -$ -$ 6,344,300$
5-Yr Interval (High) 2,477,500 26,653,200$ - -$ -$ -$ 9,273,300$
7-Yr interval (Low) 2,451,000 26,386,080$ - -$ -$ -$ 6,457,800$
7-Yr Interval (High) 3,770,200 39,683,616$ - -$ -$ -$ 9,636,800$
10-Yr Interval (Low) 3,930,400 41,298,432$ - -$ -$ -$ 7,116,900$
10-Yr Interval (High) 5,988,100 62,040,048$ - -$ -$ -$ 10,612,500$
Alternative
Scheduled
Renourishment
Future
Renourish-
ment
Event
Volume
(cy)
Future
Renourish-
ment
Event
Cost
($)
Supplemental
Volume from
Dewees Inlet
and AICWW
(cy)
Dewees Inlet
Shoal Mgt
($)
Breach Inlet
AICWW Beach
Disposal
($)
Terminal
Groin
(Rch 1)
($)
Average
Annual
Equivalent
Cost
(AAEC)
($/yr)
Trigger (Low) 3-Yr Interval 909,400 10,846,752$ - -$ -$ -$ 6,151,300$
Trigger (High) 1-Yr Interval 400,100 5,713,008$ - -$ -$ -$ 9,923,100$
Triggered
Renour-
ishment
Alternative
Note: “Future nourishment event volume and “cost” applies to all renourishments after first event.
The volume of the first renourishment event is increased to offset initial losses landward of Baseline.
Page 42
Cost Summary (preliminary)
Renourishment supplemented with AICWW Beach Disposal and Dewees Shoal Mgt
Renourishment supplemented with AICWW Beach Disposal and Dewees Shoal Mgt and Terminal Groin
Note: “Future nourishment event volume and “cost” applies to all renourishments after first event.
The volume of the first renourishment event is increased to offset initial losses landward of Baseline.
Future
Renourish-
ment
Event
Volume
(cy)
Future
Renourish-
ment
Event
Cost
($)
Supplemental
Volume from
Dewees Inlet
and AICWW
(cy)
Dewees Inlet
Shoal Mgt
($)
Breach Inlet
AICWW Beach
Disposal
($)
Terminal
Groin
(Rch 1)
($)
Average
Annual
Equivalent
Cost
(AAEC)
($/yr)
5-Yr (Low) 765,600 9,397,248$ 750,000 5,320,000$ -$ -$ 5,228,200$
5-Yr (High) 1,249,700 14,276,976$ 750,000 5,320,000$ -$ -$ 7,045,200$
7-Yr (Low) 1,071,800 12,483,744$ 1,050,000 7,000,000$ -$ -$ 4,937,000$
7-Yr (High) 1,749,600 19,315,968$ 1,050,000 7,000,000$ -$ -$ 6,822,300$
Alternative
AICWW and
Dewees Inlet Mgt
Future
Renourish-
ment
Event
Volume
(cy)
Future
Renourish-
ment
Event
Cost
($)
Supplemental
Volume from
Dewees Inlet
and AICWW
(cy)
Dewees Inlet
Shoal Mgt
($)
Breach Inlet
AICWW Beach
Disposal
($)
Terminal
Groin
(Rch 1)
($)
Average
Annual
Equivalent
Cost
(AAEC)
($/yr)
ALL 5-yr (Low) 720,000 8,937,600$ 750,000 5,320,000$ -$ 4,620,000$ 5,232,200$
ALL 5-yr (High) 925,000 11,004,000$ 750,000 5,320,000$ -$ 4,620,000$ 6,062,300$
ALL 7-yr (Low) 1,008,000 11,840,640$ 1,050,000 7,000,000$ -$ 4,620,000$ 4,925,800$
ALL 7-yr (High) 1,295,000 14,733,600$ 1,050,000 7,000,000$ -$ 4,620,000$ 6,818,600$
ALL Elements
(Reaches
1, 5, and 6)
Alternative
Details
provided on
next slide
Page 43
Example of Event Cost and 50-yr Cost Stream for Computation of AAEC (preliminary)
Item Quantity Unit Cost Units Total
Dredge Mob/Demob 1 1,500,000.00$ LS 1,500,000.00$
Sand 1,227,000 9.00$ cy 11,043,000.00$
12,543,000.00$
5% 627,150.00$
7% 878,010.00$
14,048,160.00$
0% -$
14,048,160.00$
Item Quantity Unit Cost Units Total
Dredge Mob/Demob 1 1,500,000.00$ LS 1,500,000.00$
Sand 1,008,000 9.00$ cy 9,072,000.00$
10,572,000.00$
5% 528,600.00$
7% 740,040.00$
11,840,640.00$
0% -$
11,840,640.00$
Item Quantity Unit Cost Units Total
Terminal Groin 15,000 275.00$ tons 4,125,000.00$
4,125,000.00$
5% 206,250.00$
7% 288,750.00$
4,620,000.00$
0% -$
4,620,000.00$
Item Quantity Unit Cost Units Total
Dredge Mob/Demob 1 1,000,000.00$ LS 1,000,000.00$
Sand 700,000 7.50$ cy 5,250,000.00$
6,250,000.00$
5% 312,500.00$
7% 437,500.00$
7,000,000.00$
0% -$
7,000,000.00$
Contingency
Total
Restore Baseline and Replace Advance Fill with First Renourishment
subtotal Construction
PED/Permitting
CEI/Monitoring
subtotal Project
CEI/Monitoring
subtotal Project
Contingency
Total
Dewees Shoal Dredging
subtotal Construction
PED/Permitting
Total
Terminal Groin
subtotal Construction
PED/Permitting
CEI/Monitoring
subtotal Project
Contingency
Total
Contingency
Future Maintenance (Normal Advance Fill after First Renourishment)
subtotal Construction
PED/Permitting
CEI/Monitoring
subtotal Project
Total
Cost
Renourisment
Offshore Sand
and Monitoring
Terminal
Groin
Dewees
Shoal
Mgt
Cost
Escolation
Factor
Renourisment
Offshore Sand
and Monitoring
Terminal
Groin
Dewees
Shoal
Mgt
Renourisment
Offshore Sand
and Monitoring
Terminal
Groin
Dewees
Shoal
Mgt
Present
Worth
Cost
0 2026 -$ -$ -$ -$ 1260.04 -$ -$ -$ -$ -$ -$ -$
1 2027 100,000$ 100,000$ 1292.80 102,600$ -$ -$ 99,400$ -$ -$ 99,400$
2 2028 4,720,000$ 100,000$ 4,620,000$ 1326.42 105,268$ 4,863,386$ -$ 98,700$ 4,562,000$ -$ 4,660,700$
3 2029 100,000$ 100,000$ 1360.90 108,005$ -$ -$ 98,100$ -$ -$ 98,100$
4 2030 100,000$ 100,000$ 1396.29 110,813$ -$ -$ 97,500$ -$ -$ 97,500$
5 2031 100,000$ 100,000$ 1432.59 113,694$ -$ -$ 96,900$ -$ -$ 96,900$
6 2032 100,000$ 100,000$ 1469.84 116,650$ -$ -$ 96,300$ -$ -$ 96,300$
7 2033 21,048,160$ 14,048,160$ 7,000,000$ 1508.05 16,813,218$ -$ 8,377,790$ 13,440,700$ -$ 6,697,300$ 20,138,000$
8 2034 100,000$ 100,000$ 1547.26 122,795$ -$ -$ 95,100$ -$ -$ 95,100$
9 2035 100,000$ 100,000$ 1587.49 125,987$ -$ -$ 94,500$ -$ -$ 94,500$
10 2036 100,000$ 100,000$ 1628.77 129,263$ -$ -$ 93,900$ -$ -$ 93,900$
11 2037 100,000$ 100,000$ 1671.12 132,624$ -$ -$ 93,300$ -$ -$ 93,300$
12 2038 100,000$ 100,000$ 1714.56 136,072$ -$ -$ 92,700$ -$ -$ 92,700$
13 2039 100,000$ 100,000$ 1759.14 139,610$ -$ -$ 92,100$ -$ -$ 92,100$
14 2040 18,840,640$ 11,840,640$ 7,000,000$ 1804.88 16,960,521$ -$ 10,026,793$ 10,838,700$ -$ 6,407,700$ 17,246,400$
15 2041 100,000$ 100,000$ 1851.81 146,964$ -$ -$ 91,000$ -$ -$ 91,000$
16 2042 100,000$ 100,000$ 1899.96 150,786$ -$ -$ 90,400$ -$ -$ 90,400$
17 2043 100,000$ 100,000$ 1949.35 154,705$ -$ -$ 89,800$ -$ -$ 89,800$
18 2044 100,000$ 100,000$ 2000.04 158,728$ -$ -$ 89,300$ -$ -$ 89,300$
19 2045 100,000$ 100,000$ 2052.04 162,855$ -$ -$ 88,700$ -$ -$ 88,700$
20 2046 100,000$ 100,000$ 2105.39 167,089$ -$ -$ 88,100$ -$ -$ 88,100$
21 2047 18,840,640$ 11,840,640$ 7,000,000$ 2160.13 20,298,817$ -$ 12,000,341$ 10,370,000$ -$ 6,130,600$ 16,500,600$
22 2048 100,000$ 100,000$ 2216.29 175,890$ -$ -$ 87,000$ -$ -$ 87,000$
23 2049 100,000$ 100,000$ 2273.92 180,464$ -$ -$ 86,500$ -$ -$ 86,500$
24 2050 100,000$ 100,000$ 2333.04 185,156$ -$ -$ 85,900$ -$ -$ 85,900$
25 2051 100,000$ 100,000$ 2393.70 189,970$ -$ -$ 85,400$ -$ -$ 85,400$
26 2052 100,000$ 100,000$ 2455.94 194,910$ -$ -$ 84,900$ -$ -$ 84,900$
27 2053 100,000$ 100,000$ 2519.79 199,977$ -$ -$ 84,300$ -$ -$ 84,300$
28 2054 18,840,640$ 11,840,640$ 7,000,000$ 2585.30 24,294,155$ -$ 14,362,322$ 9,921,600$ -$ 5,865,500$ 15,787,100$
29 2055 100,000$ 100,000$ 2652.52 210,511$ -$ -$ 83,300$ -$ -$ 83,300$
30 2056 100,000$ 100,000$ 2719.73 215,845$ -$ -$ 82,700$ -$ -$ 82,700$
31 2057 100,000$ 100,000$ 2788.65 221,314$ -$ -$ 82,100$ -$ -$ 82,100$
32 2058 100,000$ 100,000$ 2859.31 226,922$ -$ -$ 81,500$ -$ -$ 81,500$
33 2059 100,000$ 100,000$ 2931.77 232,672$ -$ -$ 81,000$ -$ -$ 81,000$
34 2060 100,000$ 100,000$ 3006.06 238,568$ -$ -$ 80,400$ -$ -$ 80,400$
35 2061 18,840,640$ 11,840,640$ 7,000,000$ 3082.23 28,963,793$ -$ 17,122,939$ 9,455,900$ -$ 5,590,200$ 15,046,100$
36 2062 100,000$ 100,000$ 3160.33 250,812$ -$ -$ 79,300$ -$ -$ 79,300$
37 2063 100,000$ 100,000$ 3240.41 257,167$ -$ -$ 78,800$ -$ -$ 78,800$
38 2064 100,000$ 100,000$ 3322.52 263,684$ -$ -$ 78,200$ -$ -$ 78,200$
39 2065 100,000$ 100,000$ 3406.71 270,365$ -$ -$ 77,700$ -$ -$ 77,700$
40 2066 100,000$ 100,000$ 3493.03 277,216$ -$ -$ 77,100$ -$ -$ 77,100$
41 2067 100,000$ 100,000$ 3581.55 284,241$ -$ -$ 76,600$ -$ -$ 76,600$
42 2068 18,840,640$ 11,840,640$ 7,000,000$ 3672.30 34,508,733$ -$ 20,401,020$ 9,006,300$ -$ 5,324,400$ 14,330,700$
43 2069 100,000$ 100,000$ 3765.35 298,828$ -$ -$ 75,500$ -$ -$ 75,500$
44 2070 100,000$ 100,000$ 3860.77 306,400$ -$ -$ 75,000$ -$ -$ 75,000$
45 2071 100,000$ 100,000$ 3958.60 314,164$ -$ -$ 74,500$ -$ -$ 74,500$
46 2072 100,000$ 100,000$ 4058.90 322,125$ -$ -$ 74,000$ -$ -$ 74,000$
47 2073 100,000$ 100,000$ 4161.75 330,287$ -$ -$ 73,500$ -$ -$ 73,500$
48 2074 100,000$ 100,000$ 4267.21 338,657$ -$ -$ 73,000$ -$ -$ 73,000$
49 2075 18,840,640$ 11,840,640$ 7,000,000$ 4375.34 41,115,218$ -$ 24,306,670$ 8,578,100$ -$ 5,071,200$ 13,649,300$
50 2076 100,000$ 100,000$ 4486.21 356,037$ -$ -$ 71,900$ -$ -$ 71,900$
75,287,200$ 4,562,000$ 41,086,900$ 120,936,100$
3.25% 3.25% 3.25% 3.25%
50 50 50 50
0.04073 0.04073 0.04073 0.04073
3,066,500$ 185,800$ 1,673,500$ 4,925,800$ Avg Annual Equivalent Cost
Year
Base Costs Escalated Costs Present Worth
Total Present Worth
Discount Rate
Amortization Period (years)
Capital Recovery Factor
EVENT COST
COST STREAM
AAEC
Example is for 7-Year periodic renourishment, sand contributions from Dewees Inlet shoal and AICWW (Breach Inlet), and Terminal Groin (Reach 1)
Page 44
Cost Summary - Comments
◆ Cost-effectiveness benefits derived from…
▪ Frequent, no cost sand from USACE AICWW Maintenance dredging
▪ Potentially lower cost sand from Dewees Inlet shoal management
compared to cost of sand from offshore
▪ Reduced sand loss from terminal groin at southern end of the island
Page 45
◆ Establish/Confirm Beach Management Baseline
◆ Prioritize beach management practices that provide best
opportunities to maintain baseline conditions at all times
◆ Prioritize management practices that minimize cost
Future Management
Page 46
◆ Establish appropriate beach management baseline
◆ Pursue agreement with Marinex for proposed renourishment pricing
◆ Pursue agreement with USACE to provide beach compatible sand to Reaches
1 and 2 from Breach Inlet AICWW Maintenance Dredging
◆ Investigate in more detail the feasibility, scope and cost of Dewees Inlet Shoal
Management (Consider a test project)
◆ Investigate in more detail the feasibility, scope, and cost of a Terminal Groin
at the southern end of Reach 1
◆ Consider last line of defense structural solutions in Reaches 5 and 6 to
compliment Dewees Inlet Shoal Management
Recommendations for Consideration
City of Isle of Palms
Beach Preservation Committee
Beach Management
Alternatives Analysis – Findings Discussion
September 2, 2026