RecordWell Data

Foth Beach Preservation Alternatives Analysis 9-2-206

City of Isle of Palms · Charleston County · Agendas

Open the original document More from City of Isle of Palms

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

City of Isle of Palms Beach Preservation Committee Beach Management Alternatives Analysis – Findings Discussion September 2, 2026 Page 2 ◆ Recap of Study Baseline Definition ◆ Summary of Assumed Initial Conditions ▪ Volume Change Rates ▪ 2026 Project ◆ Alternatives ◆ Cost Analysis - Assumptions and Results ◆ Future Management Outline Page 3 ◆ Baseline Development: ▪ Assumed to represent the primary dune crest of minimum beach position ▪ Identified as the seaward-most occurrence of: • 50-ft offset from seaward edge of development, • 2017 SCDES Baseline, or • Seaward edge of 2026 dune, where constructed. Alternatives Study Baseline Definition Page 4 Alternatives Study Baseline Definition Development Line (estimated) 2017 SCDES 2026 Dune 50-ft (min.) ~175 to 200-ft The “baseline” is assumed to be the primary dune crest that is identified by the seaward most occurrence of; (1) 50-ft seaward of development line, (2) the 2017 SCDES line, or (3) the seaward edge of the 2026 constructed dune. MHHW Page 5 Alternatives Study Baseline Definition Study Baseline Seaward Edge of Infrastructure (typ.) 50-ft Seaward of Seaward Edge of Infrastructure (typ.) 2017 SCDES Baseline 2026 Dune Beach Monitoring Stations Atlantic Ocean Breach Inlet Page 6 Alternatives Study Baseline Definition Seaward Edge of Infrastructure (typ.) Study Baseline 50-ft Seaward of Seaward Edge of Infrastructure (typ.) 2017 SCDES Baseline 2026 Dune Beach Monitoring Stations Page 7 Page 7 Initial Conditions Page 8 Volume Change Rates “Low Rate” Survey Period: April 2018 – September 2024 “High Rate” Survey Period: July 2021 – September 2024 Note: Volume change rates were derived from volume data reported by CSE. Page 9 Volume Change Rates (Reach 1) Note: Volume change rates were derived from volume data reported by CSE. Volume change data used for Alternatives Analysis Page 10 Volume Change Rates (Reach 5) Note: Volume change rates were derived from volume data reported by CSE. Volume change data used for Alternatives Analysis Page 11 NET Volume Change Rates (Reaches 1-6) Note: Volume change rates were derived from volume data reported by CSE. April 2018 - September 2024 ("low") July 2021 - September 2024 ("high") Reach 1 4,000 -36,800 -96,200 Reach 2 5,000 -22,300 -32,900 Reach 3 5,000 20,500 25,600 Reach 4 8,200 82,000 53,200 Reach 5 5,800 -141,900 -108,400 Reach 6 4,800 -102,200 -95,700 Total All Reaches 32,800 -200,700 -254,400 Total Reaches 1, 2, 5, & 6 19,600 -303,200 -333,200 Reach Length (ft) Annualized Volume Change Rate (cy/yr) Reach Page 12 2026 Project Volumes Based on June. 2026 Survey 800,700 cy 799,100 cy 880,100 cy Page 13 Post-2026 Beach Conditions (Projected) This is the starting condition for the alternatives analysis Based on June. 2026 Survey Page 14 Page 14 Alternatives Page 15 Alternatives ◆ No-Action (“Do Nothing”) ◆ Beach Renourishment Only (Low and High Sand Loss Rates) ▪ Scheduled (5-yr, 7-yr, and 10-yr intervals) ▪ Triggered (Interval Required to Protect Baseline Condition) ◆ USACE Breach Inlet ICWW Maintenance – Reach 1 (150,000 cy every 3 yrs) ◆ Dewees Inlet Shoal Management – Reaches 5 and 6 (700,000 cy every 7 yrs) ◆ Terminal Groin (R1) ◆ T-Groins/Breakwaters and/or Geotubes (R5/R6) – Reaches 5 and 6 (last line of defense) Page 16 No Action (Low Sand Loss Rate) Note: Does not consider possible future AICWW beach disposal. Page 17 No Action (High Sand Loss Rate) Note: Does not consider possible future AICWW beach disposal. Page 18 2026 Project Performance Assuming recent beach change conditions continue, the 2026 Project is expected to maintain beach conditions seaward of the entire assumed beach management Baseline for no more than about 3 years. Page 19 [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) Volume Lost Seaward of Baseline (cy) Volume Lost Landward of Baseline (cy) Total Volume Lost (cy) 1 122,300 61,500 183,800 245,300 158,300 322,800 481,100 803,900 2 111,400 0 111,400 111,400 164,300 0 164,300 164,300 3 0 0 0 0 0 0 0 0 4 0 0 0 0 43,400 0 43,400 43,400 5 664,200 45,000 709,200 754,200 564,800 28,500 593,300 621,800 6 503,700 7,500 511,200 518,700 591,100 126,500 717,600 844,100 Total 1,401,600 114,000 1,515,600 1,629,600 1,521,900 477,800 1,999,700 2,477,500 Predicted Preformance of 2026 Project after 5 Years [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Predicted Preformance of 2026 Project after 5 Years Reach April 2018 - September 2024 ("Low" Erosion Rate) July 2021 - September 2024 ("High" Erosion Rate) 5-Year Project Interval after Completion of 2026 Project [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Renourishment - Scheduled ◆ Required Future Volume Following Completion of 2026 Project ▪ Restore Minimum AND Maintain Baseline Beach Condition ▪ Future Advance Fill required for 5-, 7-, and 10-year renourishment intervals Page 20 [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) 1 158,300 209,200 367,500 576,700 158,300 804,000 962,300 1,766,300 2 222,800 0 222,800 222,800 262,600 66,000 328,600 394,600 3 0 0 0 0 0 0 0 0 4 0 0 0 0 86,800 0 86,800 86,800 5 885,300 533,300 1,418,600 1,951,900 741,500 445,000 1,186,500 1,631,500 6 865,800 156,600 1,022,400 1,179,000 761,700 673,600 1,435,300 2,108,900 Total 2,132,200 899,100 3,031,300 3,930,400 2,010,900 1,988,600 3,999,500 5,988,100 Predicted Preformance of 2026 Project after 10 Years [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Predicted Preformance of 2026 Project after 10 Years 10-Year Project Interval after Completion of 2026 Project April 2018 - September 2024 ("Low" Erosion Rate) July 2021 - September 2024 ("High" Erosion Rate) Reach [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) 1 146,300 110,900 257,200 368,100 158,300 515,300 673,600 1,188,900 2 155,900 0 155,900 155,900 218,900 11,000 229,900 240,900 3 0 0 0 0 0 0 0 0 4 0 0 0 0 60,800 0 60,800 60,800 5 816,100 176,900 993,000 1,169,900 675,900 154,700 830,600 985,300 6 674,300 41,400 715,700 757,100 715,100 289,600 1,004,700 1,294,300 Total 1,792,600 329,200 2,121,800 2,451,000 1,829,000 970,600 2,799,600 3,770,200 Predicted Preformance of 2026 Project after 7 Years [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) April 2018 - September 2024 ("Low" Erosion Rate) 7-Year Project Interval after Completion of 2026 Project July 2021 - September 2024 ("High" Erosion Rate) Reach Predicted Preformance of 2026 Project after 7 Years Renourishment - Scheduled Page 21 [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) 1 97,300 13,000 110,300 123,300 88,100 8,100 96,200 104,300 2 66,800 0 66,800 66,800 32,900 0 32,900 32,900 3 0 0 0 0 0 0 0 0 4 0 0 0 0 8,700 0 8,700 8,700 5 418,500 7,100 425,600 432,700 118,700 0 118,700 118,700 6 306,700 0 306,700 306,700 141,700 1,900 143,600 145,500 Total 889,300 20,100 909,400 929,500 390,100 10,000 400,100 410,100 Predicted Preformance of 2026 Project after 3 Years Predicted Preformance of 2026 Project after 1 Year[D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Trigger - 3 Years Until Erosion into Baseline [Between Stations 12+00 and 30+00] Trigger - 1 Year Until Erosion into Baseline [Between Stations 12+00 and 30+00] Reach April 2018 - September 2024 ("Low" Erosion Rate) July 2021 - September 2024 ("High" Erosion Rate) Renourishment - Triggered ◆ Implement renourishment on scheduled intervals regardless of beach condition between intervals Page 22 Breach Inlet AICWW Beach Disposal Note: Concept only. Goals: • Beneficial use of available dredge material • Supplemental sand source for Reaches 1 and 2 • Extend time between required renourishments • Reduce sand need from offshore borrow areas Assumptions: • 3 yr interval (more or less) • ~150,000 cy/event (equivalent to ~50,000 cy/yr) • All material placed in Reaches 1 and 2 • Available material is suitable for beach placement • Material provided at no cost to the City Reach 2Reach 1 Atlantic Intracoastal Waterway (AICWW) Page 23 Dewees Inlet Shoal Management Note: Concept only. Goals: • Collect ebb shoal sand before migrating shoals approach IOP shoreline • Place sand along Reaches 5 and 6 • Reduce impacts of future shoal attachments • Extend time between required renourishments • Reduce sand need from offshore borrow areas Assumptions: • 7 yr interval • 700,000 cy/event (equivalent to 100,000 cy/yr) • All material placed in Reaches 5 and 6 Page 24 [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Volume Available from AICWW (Reaches 1&2) and Dewees Shoal (Reaches 5&6) (cy) Sand Volume Needed from Offshore for Full Restoration and Maintenance (cy) [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Volume Available from AICWW (Reaches 1&2) and Dewees Shoal (Reaches 5&6) (cy) Sand Volume Needed from Offshore for Full Restoration and Maintenance (cy) 1 122,300 61,500 183,800 245,300 106,700 158,300 322,800 481,100 803,900 718,200 2 111,400 0 111,400 111,400 0 164,300 0 164,300 164,300 0 3 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 43,400 0 43,400 43,400 0 43,400 5 664,200 45,000 709,200 754,200 504,200 564,800 28,500 593,300 621,800 371,800 6 503,700 7,500 511,200 518,700 268,700 591,100 126,500 717,600 844,100 594,100 Total 1,401,600 114,000 1,515,600 1,629,600 750,000 879,600 1,521,900 477,800 1,999,700 2,477,500 750,000 1,727,500 5-Year Project Interval after Completion of 2026 Project Reach April 2018 - September 2024 ("Low" Erosion Rate) July 2021 - September 2024 ("High" Erosion Rate) 250,000 500,000 250,000 500,000 Renourishment – with AICWW and Shoal Mgt Sand [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Volume Available from AICWW (Reaches 1&2) and Dewees Shoal (Reaches 5&6) (cy) Sand Volume Needed from Offshore for Full Restoration and Maintenance (cy) [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Volume Available from AICWW (Reaches 1&2) and Dewees Shoal (Reaches 5&6) (cy) Sand Volume Needed from Offshore for Full Restoration and Maintenance (cy) 1 146,300 110,900 257,200 368,100 174,000 158,300 515,300 673,600 1,188,900 1,079,800 2 155,900 0 155,900 155,900 0 218,900 11,000 229,900 240,900 0 3 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 60,800 0 60,800 60,800 0 60,800 5 816,100 176,900 993,000 1,169,900 819,900 675,900 154,700 830,600 985,300 635,300 6 674,300 41,400 715,700 757,100 407,100 715,100 289,600 1,004,700 1,294,300 944,300 Total 1,792,600 329,200 2,121,800 2,451,000 1,050,000 1,401,000 1,829,000 970,600 2,799,600 3,770,200 1,050,000 2,720,200 Reach April 2018 - September 2024 ("Low" Erosion Rate) July 2021 - September 2024 ("High" Erosion Rate) 700,000 350,000 700,000 350,000 7-Year Project Interval after Completion of 2026 Project Page 25 Renourishment – with AICWW and Shoal Mgt Sand ◆ Demand on offshore sand can be reduced with use of beach compatible sand from AICWW and Dewees Inlet Shoal Management. ◆ Proposed sand volume from AICWW beach disposal MAY NOT be sufficient to maintain Baseline conditions along Reach 1 without sand from offshore. ◆ Available volumes and schedule will need to be confirmed. [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Volume Available from AICWW (Reaches 1&2) and Dewees Shoal (Reaches 5&6) (cy) Sand Volume Needed from Offshore for Full Restoration and Maintenance (cy) [A] Volume Lost Seaward of Baseline (cy) [B] Volume Lost Landward of Baseline (cy) [C = A + B] Total Volume Lost (cy) [D = C + B] Future Volume Required to Restore and Maintain Beach Seaward of Baseline (cy) Volume Available from AICWW (Reaches 1&2) and Dewees Shoal (Reaches 5&6) (cy) Sand Volume Needed from Offshore for Full Restoration and Maintenance (cy) 1 158,300 209,200 367,500 576,700 299,500 158,300 804,000 962,300 1,766,300 1,660,900 2 222,800 0 222,800 222,800 0 262,600 66,000 328,600 394,600 0 3 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 86,800 0 86,800 86,800 0 86,800 5 885,300 533,300 1,418,600 1,951,900 1,451,900 741,500 445,000 1,186,500 1,631,500 1,131,500 6 865,800 156,600 1,022,400 1,179,000 679,000 761,700 673,600 1,435,300 2,108,900 1,608,900 Total 2,132,200 899,100 3,031,300 3,930,400 1,500,000 2,430,400 2,010,900 1,988,600 3,999,500 5,988,100 1,500,000 4,488,100 10-Year Project Interval after Completion of 2026 Project Reach April 2018 - September 2024 ("Low" Erosion Rate) July 2021 - September 2024 ("High" Erosion Rate) 500,000 1,000,000 500,000 1,000,000 Page 26 Renourishment with Structures ◆ Terminal Groin (Reach 1) Page 27 7-Year Condition Volume Loss Beyond Baseline (typ.) Post-Project Beach Volume Performance Relative to Baseline “Low” rate (2018-2024) “High” rate (2021-2024) Anticipated Sand Loss Landward of Baseline (Reach 1) Page 28 Reach 1 Reach 2 6th Avenue Area of Highest Erosion and Volume Loss (typ.) Beach Monitoring Stations Pier 14th Avenue Anticipated Sand Loss Landward of Baseline (Reach 1) Page 29 Reach 1 Reach 2 6th Avenue Terminal Groin (~1,200 ft) Concept shoreline response 14th Avenue Pier Goals: • Reduce sand loss from the southern end of the island • Anchor shoreline position away from Baseline • Extend time between required renourishment events • Reduce demand on sand from offshore borrow areas Assumptions: • ~1,200 feet long (most of structure to be buried) • ~15,000 tons of rock (with stone-filled mattress foundation) • Reduces sand loss: • Reach 1 by 50% • Reach 2 by 25% Terminal Groin (Reach 1) Note: Structures shown are conceptual and do not represent a final design. Quantities are assumed. Page 30 Renourishment with Structures ◆ Terminal Groin (Reach 1) ◆ T-Groins/Breakwaters (Reaches 5 and 6) Page 31 7-Year Condition Volume Loss Beyond Baseline (typ.) Post-Project Beach Volume Performance Relative to Baseline “Low” rate (2018-2024) “High” rate (2021-2024) Anticipated Sand Loss Landward of Baseline (Reaches 5 &6) Page 32 Area of Highest Erosion (typ.) Wild Dunes Resort Anticipated Sand Loss Landward of Baseline (Reaches 5 &6) Page 33 T-Groins and Breakwaters (Reaches 5 and 6) Breakwater (typ.) T-groin (typ.) Wild Dunes Resort Note: Structures shown are conceptual and do not represent a final design. Quantities are assumed. Goals: • Provide last line of defense to upland • Anchor shoreline position at Baseline under most eroded conditions • Maintain recreational beach seaward of Baseline Note: Not intended to reduce sand loss rate from renourishment but may allow for smaller fill volumes and longer periods between renourishments Assumptions: • Reach 5 (5, T-groins and 2, breakwaters) • Reach 6 (2, T-groins and 2, breakwaters) • T-Groin = 2,800 tons with foundation • Breakwater = 1,600 tons with foundation Page 34 Renourishment with Structures ◆ Terminal Groin (Reach 1) ◆ T-Groins/Breakwaters (Reaches 5 and 6) ◆ Sand filled Geotubes (Reaches 5 and 6) Page 35 Geotubes (Reaches 5 and 6) Geotubes (typ.) Wild Dunes Resort Note: Structures shown are conceptual and do not represent a final design. Quantities are assumed. Goals: • Provide last line of defense to upland • Anchor shoreline position at Baseline under most eroded conditions Note: Not intended to maintain recreational beach seaward of Baseline Assumptions: • Reach 5 = 3,300 feet • Reach 6 = 1,700 feet Page 36 Beach Management Elements Summary Note: Concept. Does not represent a final design. Renourishment Renourishment AICWW Beach Disposal Dewees Inlet Shoal Mgt T-Groins/ Breakwaters or Geotubes Offshore Borrow Areas Reach 2Reach 1 Reach 5 Reach 6 Terminal Groin Page 37 Known Offshore Sand Sources Sand Availability: no more than ~25 Mcy (pre-2026) (ref: CSE) ◆ Depleted: A, B, C, F ◆ Partially Depleted: E ◆ Available: D, G ◆ 2026 Project: Area 1 ◆ Future: Area 2-5 Sand Demand: Planning Period (yrs) Total Sand Demand (cy) Total Sand Demand with 20% Contingency (cy) Low 303,000 50 15,150,000 18,200,000 High 400,000 50 20,000,000 24,000,000 Annual Sand Loss (cy/yr) Page 38 ◆ Offshore sand for continued renourishment ▪ Mob/Demob = $1.5M ▪ Sand = $9/cy (ref: recent Marinex proposal to City of IOP) ▪ As needed ◆ Dewees Inlet Shoal Management ▪ Mob/Demob = $1.0M (assumed) ▪ Sand = $7.5/cy (assumed) ▪ 700,000 cy every 7 years (equivalent to 100,000 cy/yr – Reaches 5 and 6 only) ◆ Breach Inlet AICWW Beach Disposal ▪ No cost to the City of IOP (ref: communications between USACE and City of IOP) ▪ 150,000 cy every 3 years (equivalent to 50,000 cy/yr – Reaches 1 and 2 only) Cost Assumptions - Sand Page 39 ◆ Rock - Effective unit cost = $275/ton (recent market conditions in SC & NC) ▪ Terminal Groin (Reach 1) ~$4.5 to $5.5M ▪ T-Groins/Breakwaters (Reach 5) ~$4 to $5M ▪ T-Groins/Breakwaters (Reach 6) ~$3.5 to $4M ◆ Geotubes – Effective unit cost = $570/ft (recent market conditions in NC) Cost Assumptions - Structures Page 40 ◆ Planning, Engineering, and Design (PED) = 5% of construction cost ◆ Const. Engr and Inspection (CEI) = 7% of construction cost ◆ Contingency = 0% (Note: The assumed costs are based upon proposals from industry and recent market examples, so no contingency is applied to costs.) ◆ Planning period (n) = 50 years ◆ Discount rate (i) = 3.25% (2026 USACE planning guidance) Cost Assumptions - Other Page 41 Cost Summary (preliminary) Scheduled Renourishment (offshore sand sources only; baseline condition rebuilt at time of each event) Triggered Renourishment (offshore sand sources only) Future Renourish- ment Event Volume (cy) Future Renourish- ment Event Cost ($) Supplemental Volume from Dewees Inlet and AICWW (cy) Dewees Inlet Shoal Mgt ($) Breach Inlet AICWW Beach Disposal ($) Terminal Groin (Rch 1) ($) Average Annual Equivalent Cost (AAEC) ($/yr) 5-Yr Interval (Low) 1,629,600 18,106,368$ - -$ -$ -$ 6,344,300$ 5-Yr Interval (High) 2,477,500 26,653,200$ - -$ -$ -$ 9,273,300$ 7-Yr interval (Low) 2,451,000 26,386,080$ - -$ -$ -$ 6,457,800$ 7-Yr Interval (High) 3,770,200 39,683,616$ - -$ -$ -$ 9,636,800$ 10-Yr Interval (Low) 3,930,400 41,298,432$ - -$ -$ -$ 7,116,900$ 10-Yr Interval (High) 5,988,100 62,040,048$ - -$ -$ -$ 10,612,500$ Alternative Scheduled Renourishment Future Renourish- ment Event Volume (cy) Future Renourish- ment Event Cost ($) Supplemental Volume from Dewees Inlet and AICWW (cy) Dewees Inlet Shoal Mgt ($) Breach Inlet AICWW Beach Disposal ($) Terminal Groin (Rch 1) ($) Average Annual Equivalent Cost (AAEC) ($/yr) Trigger (Low) 3-Yr Interval 909,400 10,846,752$ - -$ -$ -$ 6,151,300$ Trigger (High) 1-Yr Interval 400,100 5,713,008$ - -$ -$ -$ 9,923,100$ Triggered Renour- ishment Alternative Note: “Future nourishment event volume and “cost” applies to all renourishments after first event. The volume of the first renourishment event is increased to offset initial losses landward of Baseline. Page 42 Cost Summary (preliminary) Renourishment supplemented with AICWW Beach Disposal and Dewees Shoal Mgt Renourishment supplemented with AICWW Beach Disposal and Dewees Shoal Mgt and Terminal Groin Note: “Future nourishment event volume and “cost” applies to all renourishments after first event. The volume of the first renourishment event is increased to offset initial losses landward of Baseline. Future Renourish- ment Event Volume (cy) Future Renourish- ment Event Cost ($) Supplemental Volume from Dewees Inlet and AICWW (cy) Dewees Inlet Shoal Mgt ($) Breach Inlet AICWW Beach Disposal ($) Terminal Groin (Rch 1) ($) Average Annual Equivalent Cost (AAEC) ($/yr) 5-Yr (Low) 765,600 9,397,248$ 750,000 5,320,000$ -$ -$ 5,228,200$ 5-Yr (High) 1,249,700 14,276,976$ 750,000 5,320,000$ -$ -$ 7,045,200$ 7-Yr (Low) 1,071,800 12,483,744$ 1,050,000 7,000,000$ -$ -$ 4,937,000$ 7-Yr (High) 1,749,600 19,315,968$ 1,050,000 7,000,000$ -$ -$ 6,822,300$ Alternative AICWW and Dewees Inlet Mgt Future Renourish- ment Event Volume (cy) Future Renourish- ment Event Cost ($) Supplemental Volume from Dewees Inlet and AICWW (cy) Dewees Inlet Shoal Mgt ($) Breach Inlet AICWW Beach Disposal ($) Terminal Groin (Rch 1) ($) Average Annual Equivalent Cost (AAEC) ($/yr) ALL 5-yr (Low) 720,000 8,937,600$ 750,000 5,320,000$ -$ 4,620,000$ 5,232,200$ ALL 5-yr (High) 925,000 11,004,000$ 750,000 5,320,000$ -$ 4,620,000$ 6,062,300$ ALL 7-yr (Low) 1,008,000 11,840,640$ 1,050,000 7,000,000$ -$ 4,620,000$ 4,925,800$ ALL 7-yr (High) 1,295,000 14,733,600$ 1,050,000 7,000,000$ -$ 4,620,000$ 6,818,600$ ALL Elements (Reaches 1, 5, and 6) Alternative Details provided on next slide Page 43 Example of Event Cost and 50-yr Cost Stream for Computation of AAEC (preliminary) Item Quantity Unit Cost Units Total Dredge Mob/Demob 1 1,500,000.00$ LS 1,500,000.00$ Sand 1,227,000 9.00$ cy 11,043,000.00$ 12,543,000.00$ 5% 627,150.00$ 7% 878,010.00$ 14,048,160.00$ 0% -$ 14,048,160.00$ Item Quantity Unit Cost Units Total Dredge Mob/Demob 1 1,500,000.00$ LS 1,500,000.00$ Sand 1,008,000 9.00$ cy 9,072,000.00$ 10,572,000.00$ 5% 528,600.00$ 7% 740,040.00$ 11,840,640.00$ 0% -$ 11,840,640.00$ Item Quantity Unit Cost Units Total Terminal Groin 15,000 275.00$ tons 4,125,000.00$ 4,125,000.00$ 5% 206,250.00$ 7% 288,750.00$ 4,620,000.00$ 0% -$ 4,620,000.00$ Item Quantity Unit Cost Units Total Dredge Mob/Demob 1 1,000,000.00$ LS 1,000,000.00$ Sand 700,000 7.50$ cy 5,250,000.00$ 6,250,000.00$ 5% 312,500.00$ 7% 437,500.00$ 7,000,000.00$ 0% -$ 7,000,000.00$ Contingency Total Restore Baseline and Replace Advance Fill with First Renourishment subtotal Construction PED/Permitting CEI/Monitoring subtotal Project CEI/Monitoring subtotal Project Contingency Total Dewees Shoal Dredging subtotal Construction PED/Permitting Total Terminal Groin subtotal Construction PED/Permitting CEI/Monitoring subtotal Project Contingency Total Contingency Future Maintenance (Normal Advance Fill after First Renourishment) subtotal Construction PED/Permitting CEI/Monitoring subtotal Project Total Cost Renourisment Offshore Sand and Monitoring Terminal Groin Dewees Shoal Mgt Cost Escolation Factor Renourisment Offshore Sand and Monitoring Terminal Groin Dewees Shoal Mgt Renourisment Offshore Sand and Monitoring Terminal Groin Dewees Shoal Mgt Present Worth Cost 0 2026 -$ -$ -$ -$ 1260.04 -$ -$ -$ -$ -$ -$ -$ 1 2027 100,000$ 100,000$ 1292.80 102,600$ -$ -$ 99,400$ -$ -$ 99,400$ 2 2028 4,720,000$ 100,000$ 4,620,000$ 1326.42 105,268$ 4,863,386$ -$ 98,700$ 4,562,000$ -$ 4,660,700$ 3 2029 100,000$ 100,000$ 1360.90 108,005$ -$ -$ 98,100$ -$ -$ 98,100$ 4 2030 100,000$ 100,000$ 1396.29 110,813$ -$ -$ 97,500$ -$ -$ 97,500$ 5 2031 100,000$ 100,000$ 1432.59 113,694$ -$ -$ 96,900$ -$ -$ 96,900$ 6 2032 100,000$ 100,000$ 1469.84 116,650$ -$ -$ 96,300$ -$ -$ 96,300$ 7 2033 21,048,160$ 14,048,160$ 7,000,000$ 1508.05 16,813,218$ -$ 8,377,790$ 13,440,700$ -$ 6,697,300$ 20,138,000$ 8 2034 100,000$ 100,000$ 1547.26 122,795$ -$ -$ 95,100$ -$ -$ 95,100$ 9 2035 100,000$ 100,000$ 1587.49 125,987$ -$ -$ 94,500$ -$ -$ 94,500$ 10 2036 100,000$ 100,000$ 1628.77 129,263$ -$ -$ 93,900$ -$ -$ 93,900$ 11 2037 100,000$ 100,000$ 1671.12 132,624$ -$ -$ 93,300$ -$ -$ 93,300$ 12 2038 100,000$ 100,000$ 1714.56 136,072$ -$ -$ 92,700$ -$ -$ 92,700$ 13 2039 100,000$ 100,000$ 1759.14 139,610$ -$ -$ 92,100$ -$ -$ 92,100$ 14 2040 18,840,640$ 11,840,640$ 7,000,000$ 1804.88 16,960,521$ -$ 10,026,793$ 10,838,700$ -$ 6,407,700$ 17,246,400$ 15 2041 100,000$ 100,000$ 1851.81 146,964$ -$ -$ 91,000$ -$ -$ 91,000$ 16 2042 100,000$ 100,000$ 1899.96 150,786$ -$ -$ 90,400$ -$ -$ 90,400$ 17 2043 100,000$ 100,000$ 1949.35 154,705$ -$ -$ 89,800$ -$ -$ 89,800$ 18 2044 100,000$ 100,000$ 2000.04 158,728$ -$ -$ 89,300$ -$ -$ 89,300$ 19 2045 100,000$ 100,000$ 2052.04 162,855$ -$ -$ 88,700$ -$ -$ 88,700$ 20 2046 100,000$ 100,000$ 2105.39 167,089$ -$ -$ 88,100$ -$ -$ 88,100$ 21 2047 18,840,640$ 11,840,640$ 7,000,000$ 2160.13 20,298,817$ -$ 12,000,341$ 10,370,000$ -$ 6,130,600$ 16,500,600$ 22 2048 100,000$ 100,000$ 2216.29 175,890$ -$ -$ 87,000$ -$ -$ 87,000$ 23 2049 100,000$ 100,000$ 2273.92 180,464$ -$ -$ 86,500$ -$ -$ 86,500$ 24 2050 100,000$ 100,000$ 2333.04 185,156$ -$ -$ 85,900$ -$ -$ 85,900$ 25 2051 100,000$ 100,000$ 2393.70 189,970$ -$ -$ 85,400$ -$ -$ 85,400$ 26 2052 100,000$ 100,000$ 2455.94 194,910$ -$ -$ 84,900$ -$ -$ 84,900$ 27 2053 100,000$ 100,000$ 2519.79 199,977$ -$ -$ 84,300$ -$ -$ 84,300$ 28 2054 18,840,640$ 11,840,640$ 7,000,000$ 2585.30 24,294,155$ -$ 14,362,322$ 9,921,600$ -$ 5,865,500$ 15,787,100$ 29 2055 100,000$ 100,000$ 2652.52 210,511$ -$ -$ 83,300$ -$ -$ 83,300$ 30 2056 100,000$ 100,000$ 2719.73 215,845$ -$ -$ 82,700$ -$ -$ 82,700$ 31 2057 100,000$ 100,000$ 2788.65 221,314$ -$ -$ 82,100$ -$ -$ 82,100$ 32 2058 100,000$ 100,000$ 2859.31 226,922$ -$ -$ 81,500$ -$ -$ 81,500$ 33 2059 100,000$ 100,000$ 2931.77 232,672$ -$ -$ 81,000$ -$ -$ 81,000$ 34 2060 100,000$ 100,000$ 3006.06 238,568$ -$ -$ 80,400$ -$ -$ 80,400$ 35 2061 18,840,640$ 11,840,640$ 7,000,000$ 3082.23 28,963,793$ -$ 17,122,939$ 9,455,900$ -$ 5,590,200$ 15,046,100$ 36 2062 100,000$ 100,000$ 3160.33 250,812$ -$ -$ 79,300$ -$ -$ 79,300$ 37 2063 100,000$ 100,000$ 3240.41 257,167$ -$ -$ 78,800$ -$ -$ 78,800$ 38 2064 100,000$ 100,000$ 3322.52 263,684$ -$ -$ 78,200$ -$ -$ 78,200$ 39 2065 100,000$ 100,000$ 3406.71 270,365$ -$ -$ 77,700$ -$ -$ 77,700$ 40 2066 100,000$ 100,000$ 3493.03 277,216$ -$ -$ 77,100$ -$ -$ 77,100$ 41 2067 100,000$ 100,000$ 3581.55 284,241$ -$ -$ 76,600$ -$ -$ 76,600$ 42 2068 18,840,640$ 11,840,640$ 7,000,000$ 3672.30 34,508,733$ -$ 20,401,020$ 9,006,300$ -$ 5,324,400$ 14,330,700$ 43 2069 100,000$ 100,000$ 3765.35 298,828$ -$ -$ 75,500$ -$ -$ 75,500$ 44 2070 100,000$ 100,000$ 3860.77 306,400$ -$ -$ 75,000$ -$ -$ 75,000$ 45 2071 100,000$ 100,000$ 3958.60 314,164$ -$ -$ 74,500$ -$ -$ 74,500$ 46 2072 100,000$ 100,000$ 4058.90 322,125$ -$ -$ 74,000$ -$ -$ 74,000$ 47 2073 100,000$ 100,000$ 4161.75 330,287$ -$ -$ 73,500$ -$ -$ 73,500$ 48 2074 100,000$ 100,000$ 4267.21 338,657$ -$ -$ 73,000$ -$ -$ 73,000$ 49 2075 18,840,640$ 11,840,640$ 7,000,000$ 4375.34 41,115,218$ -$ 24,306,670$ 8,578,100$ -$ 5,071,200$ 13,649,300$ 50 2076 100,000$ 100,000$ 4486.21 356,037$ -$ -$ 71,900$ -$ -$ 71,900$ 75,287,200$ 4,562,000$ 41,086,900$ 120,936,100$ 3.25% 3.25% 3.25% 3.25% 50 50 50 50 0.04073 0.04073 0.04073 0.04073 3,066,500$ 185,800$ 1,673,500$ 4,925,800$ Avg Annual Equivalent Cost Year Base Costs Escalated Costs Present Worth Total Present Worth Discount Rate Amortization Period (years) Capital Recovery Factor EVENT COST COST STREAM AAEC Example is for 7-Year periodic renourishment, sand contributions from Dewees Inlet shoal and AICWW (Breach Inlet), and Terminal Groin (Reach 1) Page 44 Cost Summary - Comments ◆ Cost-effectiveness benefits derived from… ▪ Frequent, no cost sand from USACE AICWW Maintenance dredging ▪ Potentially lower cost sand from Dewees Inlet shoal management compared to cost of sand from offshore ▪ Reduced sand loss from terminal groin at southern end of the island Page 45 ◆ Establish/Confirm Beach Management Baseline ◆ Prioritize beach management practices that provide best opportunities to maintain baseline conditions at all times ◆ Prioritize management practices that minimize cost Future Management Page 46 ◆ Establish appropriate beach management baseline ◆ Pursue agreement with Marinex for proposed renourishment pricing ◆ Pursue agreement with USACE to provide beach compatible sand to Reaches 1 and 2 from Breach Inlet AICWW Maintenance Dredging ◆ Investigate in more detail the feasibility, scope and cost of Dewees Inlet Shoal Management (Consider a test project) ◆ Investigate in more detail the feasibility, scope, and cost of a Terminal Groin at the southern end of Reach 1 ◆ Consider last line of defense structural solutions in Reaches 5 and 6 to compliment Dewees Inlet Shoal Management Recommendations for Consideration City of Isle of Palms Beach Preservation Committee Beach Management Alternatives Analysis – Findings Discussion September 2, 2026

Source: City of Isle of Palms website. First collected Oct 26, 2026.