RecordWell Data

Update from Steven Traynum

City of Isle of Palms · Charleston County · Agendas

Open the original document More from City of Isle of Palms

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. 2026 ISLE OF PALMS City Council Update August 25th, 2026 Isle of Palms, SC City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. • Survey completed in June 2026 • Prior survey in Feb 2026 • Serves as pre-project condition survey • Includes additional survey profiles at south end required by permits Beach Monitoring Update 1 2 3 4 5 6 7 City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. • New/updated report will include • Executive Summary • Dedicated section for shoreline position/beach width analysis • Geographical references • More mapped data graphics • Reorganized data sections Updated Report City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. Updated Report – Shoreline Position City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. • IOP beach gained 42,000 cy of sand Feb- June 2026 • Total gain of 230,000 cy over past year • Gains mostly south of pier and at shoal attachment area • Erosion hotspots near Grand Pavilion, Seascape/Ocean Club, Reaches 3-4 Big Picture City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. • Variable trends of erosion and accretion • Gaining along center Wild Dunes area due to continued shoal attachment (Beachwood to Marines Walk) • Erosional adjacent to shoal (Grand Pavilion, Summerhouse to Ocean Club) • Overall loss of 64,000 cy over past year • Reaches 5a-6b net gain of 340,000cy over past three years, offset by continued erosion of adjacent areas North Island (Monitoring Reaches 5-6) City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. North Island (Monitoring Reaches 5-6) City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. • Center reaches were erosional the past year as sand wave moved south past pier. • Loss of ~60,000 cy over the past year • Area gained 650,000 cy from 2018-2025 and remains very healthy • Erosional signature higher north of Citadel House Center Island (Monitoring Reaches 3-4) City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. Center Island (Monitoring Reaches 3-4) City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. • South of pier has gained 441,000 cy since February 2025 • Large portion of the gain due to USACE projects, which placed ~700,000 cy. • Additional gains from sand moving from north of pier • Significant dune recovery over past 6 months • Outer ridge will eventually move to upper beach/dune South End (Monitoring Reaches 1-2) Outer Beach RidgeSwale City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. South End (Monitoring Reaches 1-2) -400.0 -300.0 -200.0 -100.0 0.0 100.0 200.0 300.0 400.0 500.0 4 8 12 16 20 25 30 35 40 45 50 55 60 65 70 75 80 90 100 110 120 130 140 150 160 170 180 190 200 Movement of the normal high tide line (+ seaward) compared to the 2009 position (ft) Position of the normal high tide line compared to 2009 location Sep-10 Jun-11 Jul-12 Jul-13 Sep-14 Aug-15 Aug-16 May-17 Apr-18 Jun-19 Jun-20 Jul-21 Aug-22 Aug-23 Sep-24 Feb-25 Aug-25 Feb-26 8th 4th 21st 33rd Pier • Shoreline is near the 2009 position between 4th and 8th Ave. • Shoreline is at healthiest position recorded between 8th and 21st Ave • Southern 1,000 lf of beach still eroded but likely to gain additional sand over next few months City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. Total Volume • Nourishment will add 2.5 million cy of sand to the beach • Overall, the island will hold nearly 1.6 million cy more sand than at any prior point since 2009. • Prior nourishments have had a significant benefit to entire island • Erosion hotspots near inlets will continue City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. • Mobilization to IOP began 7/7/2026 • Subline landed in Reach 2 on 7/16/2026 • Dredge Mobilized to borrow area on 7/25/2025 • First material pumped on shore on 7/27/2026 • First payment application on 8/14/2026 (Sta 280+00 to 296+00) • Last Completed Station: 314+00 (Ocean Club) • Anticipated Reach 1 Completion Date is 9/16/2026* Earlier if weather is favorable Nourishment Update City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. Reach 1: 900,000 cubic yards • Placed to data (Aug 19): 526,913 cubic yards • Up to Station 309+00 (Seascape Villas) • Widest part of the template • Pay App 1: 98,676 cubic yards • Station 280+00 to 296+00 • Also included a portion of mobilization Volume Breakdown City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. • Dune construction along 2,600 linear feet of Reach 1 • Average berm width of 300 feet of dry sand beach • Widest berm width is around ~600 feet • Marinex has three spreaders to accommodate for wide berms • Beach will equalize its profile shortly after completion and berm widths will decrease Shoreline Growth City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. Next Steps • Reach 1 expected completion is around September 16th • Sandbag removal underway – Mostly complete at north end • Move onto Reach 2 directly after for 800,000 cubic yards • Dredge may have to move to complete Reach 3 depending on timing due to USFWS work windows • USFWS work windows require all work within 1 mile of an Inlet to be done by November 30th • USFWS zone covers up to Access 7 (67% of sand in Reach 3) • Continued beach monitoring City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. Beach Project Info • https://www.isleofpalms.gov/city-managed-beach- restoration-projectsContinued beach monitoring • Click top banner on isleofpalms.gov • Instagram/Facebook City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc. Post- Construction THANK YOU!

Source: City of Isle of Palms website. First collected Oct 26, 2026.