City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
2026 ISLE OF PALMS
City Council Update
August 25th, 2026
Isle of Palms, SC
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
• Survey completed in June 2026
• Prior survey in Feb 2026
• Serves as pre-project condition
survey
• Includes additional survey profiles at
south end required by permits
Beach Monitoring Update
1 2 3 4
5
6
7
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
• New/updated report will include
• Executive Summary
• Dedicated section for shoreline
position/beach width analysis
• Geographical references
• More mapped data graphics
• Reorganized data sections
Updated Report
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
Updated Report – Shoreline Position
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
• IOP beach gained 42,000 cy of sand Feb-
June 2026
• Total gain of 230,000 cy over past year
• Gains mostly south of pier and at shoal
attachment area
• Erosion hotspots near Grand Pavilion,
Seascape/Ocean Club, Reaches 3-4
Big Picture
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
• Variable trends of erosion and accretion
• Gaining along center Wild Dunes area due
to continued shoal attachment (Beachwood
to Marines Walk)
• Erosional adjacent to shoal (Grand
Pavilion, Summerhouse to Ocean Club)
• Overall loss of 64,000 cy over past year
• Reaches 5a-6b net gain of 340,000cy over
past three years, offset by continued
erosion of adjacent areas
North Island (Monitoring Reaches 5-6)
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
North Island (Monitoring Reaches 5-6)
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
• Center reaches were erosional the past
year as sand wave moved south past pier.
• Loss of ~60,000 cy over the past year
• Area gained 650,000 cy from 2018-2025
and remains very healthy
• Erosional signature higher north of Citadel
House
Center Island (Monitoring Reaches 3-4)
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
Center Island (Monitoring Reaches 3-4)
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
• South of pier has gained 441,000 cy since
February 2025
• Large portion of the gain due to USACE
projects, which placed ~700,000 cy.
• Additional gains from sand moving from
north of pier
• Significant dune recovery over past 6
months
• Outer ridge will eventually move to upper
beach/dune
South End (Monitoring Reaches 1-2)
Outer
Beach
RidgeSwale
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
South End (Monitoring Reaches 1-2)
-400.0
-300.0
-200.0
-100.0
0.0
100.0
200.0
300.0
400.0
500.0
4 8 12 16 20 25 30 35 40 45 50 55 60 65 70 75 80 90 100 110 120 130 140 150 160 170 180 190 200
Movement of the normal high tide line (+ seaward) compared to the
2009 position (ft)
Position of the normal high tide line compared to 2009 location
Sep-10 Jun-11 Jul-12 Jul-13 Sep-14 Aug-15 Aug-16 May-17 Apr-18
Jun-19 Jun-20 Jul-21 Aug-22 Aug-23 Sep-24 Feb-25 Aug-25 Feb-26
8th
4th
21st
33rd
Pier
• Shoreline is near the 2009
position between 4th and 8th Ave.
• Shoreline is at healthiest position
recorded between 8th and 21st Ave
• Southern 1,000 lf of beach still
eroded but likely to gain additional
sand over next few months
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
Total Volume
• Nourishment will add 2.5 million cy
of sand to the beach
• Overall, the island will hold nearly
1.6 million cy more sand than at
any prior point since 2009.
• Prior nourishments have had a
significant benefit to entire island
• Erosion hotspots near inlets will
continue
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
• Mobilization to IOP began 7/7/2026
• Subline landed in Reach 2 on 7/16/2026
• Dredge Mobilized to borrow area on
7/25/2025
• First material pumped on shore on
7/27/2026
• First payment application on 8/14/2026
(Sta 280+00 to 296+00)
• Last Completed Station: 314+00 (Ocean
Club)
• Anticipated Reach 1 Completion Date is
9/16/2026* Earlier if weather is favorable
Nourishment Update
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
Reach 1: 900,000 cubic yards
• Placed to data (Aug 19): 526,913 cubic
yards
• Up to Station 309+00 (Seascape
Villas)
• Widest part of the template
• Pay App 1: 98,676 cubic yards
• Station 280+00 to 296+00
• Also included a portion of
mobilization
Volume Breakdown
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
• Dune construction along 2,600 linear feet of Reach 1
• Average berm width of 300 feet of dry sand beach
• Widest berm width is around ~600 feet
• Marinex has three spreaders to accommodate for wide
berms
• Beach will equalize its profile shortly after completion
and berm widths will decrease
Shoreline Growth
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
Next Steps
• Reach 1 expected completion is around September
16th
• Sandbag removal underway – Mostly complete at north
end
• Move onto Reach 2 directly after for 800,000 cubic
yards
• Dredge may have to move to complete Reach 3
depending on timing due to USFWS work windows
• USFWS work windows require all work within 1 mile of
an Inlet to be done by November 30th
• USFWS zone covers up to Access 7 (67% of sand in
Reach 3)
• Continued beach monitoring
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
Beach Project Info
• https://www.isleofpalms.gov/city-managed-beach-
restoration-projectsContinued beach monitoring
• Click top banner on isleofpalms.gov
• Instagram/Facebook
City Council Update for Isle of Palms Renourishment (25 Aug 2026) Coastal Science & Engineering, Inc.
Post-
Construction
THANK YOU!