PHASE 1 – Wild Dunes Harbor Course Tidal Flood Mitigation
Raised Golf Course
Pathway (Typ.)
Drainage Pipe (Typ.)
Raised Berm /
Landscape (Typ.)
PHASE 1A – 3107, 3109, and 3111 Waterway Blvd.
Tidal Flood Mitigation
Raised Berm /
Landscape (Typ.)
Drainage Pipe (Typ.)
PHASE 2– Waterway Blvd. - Pathway, Tidal Flood Mitigation,
and Drainage Improvements
Drainage Pipe (Typ.)
Improved Pathway (Typ.)
Check Valve Installed
on Exist. System (Typ.)
PHASE 2– Waterway Blvd. - Pathway, Tidal Flood Mitigation,
and Drainage Improvements
Water Line Offset (eliminated by CO 1)
Proposed Utility Line Offsets
Sewer FM Offset
Sewer FM Offset
Sewer FM Offset
Water Line Offset (added by CO 2)
Water Line Offset (added by CO 2)
Water Line Offset (added by CO 2)
Sewer FM Offset
Water Line Offset
Water Line Offset
PHASE 2– Waterway Blvd. - Pathway, Tidal Flood Mitigation,
and Drainage Improvements
CO 2
3 Add. Water Line Offsets
CO 1
Revised Drainage
CO 1
Eliminated Water Line Offset
Potential Future
Project Change
(Remove from
Contract)
Potential Future Project Change:
Eliminate Portions of Planned Sodding
Potential Future Project Change:
Eliminate Replacing Certain Driveways
Contract Changes
PHASE 3 – 3607, 3609, 3611, 3613 and 3615 Waterway Blvd. -
Tidal Flood Mitigation