Public Services & Facilities Committee
9:00 a.m., Tuesday, October 6, 2026
1207 Palm Boulevard
City Hall Council Chambers
Public Comment:
Citizens who wish to speak during the meeting must email their first and last name, address
and topic to Nicole DeNeane, City Clerk, at nicoled@isleofpalms.gov no later than 3:00 p.m.
the day before the meeting. Citizens may also provide written public comment here:
https://www.isleofpalms.gov/public-comment-form
Agenda
1. Call to order and acknowledgment that the press and the public have been
duly notified of the meeting in accordance with the Freedom of Information Act.
2. Citizens’ Comments – All comments have a time limit of three (3) minutes.
3. Approval of previous meeting’s minutes – September 1, 2026
4. Marina Tenants’ Comments
5. Departmental Reports
6. Old Business
a. Discussion and consideration of IT RFP responses
b. Update and discussion of Waterway Boulevard project and future phase 3
c. Update on beach projects
d. Update on drainage project from 36th Ave-Marginal Road
e. Update on marina dredging project work schedule
f. Update on marina bulkhead recoating
g. Discussion and consideration of Sharp response to AV Proposal
h. Update on beach volleyball court at Recreation Center
7. New Business- Discussion and consideration of proposals to reconfigure the
marina parking lot
8. Miscellaneous Business- next meeting: Wednesday, November 4, 2026 at
9am
9. Adjournment
1
Public Services & Facilities Committee Meeting
9:00am, Tuesday, September 1, 2026
1207 Palm Boulevard, Isle of Palms, SC and
broadcasted live on YouTube: https://www.youtube.com/user/cityofisleofpalms
MINUTES
1. Call to Order
Present: Council members Miars, Streetman and Pierce
Staff Present: Administrator Kerr, Deputy Administrator Kuester, Director Asero,
Director Ferrell
Also present: Rick Karkowski, Thomas & Hutton
2. Citizen’s Comments – none
MOTION: Council Member Miars made a motion to reorder the agenda so that topics
involving Thomas & Hutton were discussed first. Council Member Pierce seconded the
motion. The motion passed unanimously.
3. Old Business
A. Update on Waterway Boulevard Project
Administrator Kerr provided an update on the Waterway Boulevard project, noting that it is
generally back on track following several utility conflicts, including an AT&T conflict and other
utility issues, which he indicated have now been resolved. He also addressed concerns raised by
residents in the 3600 block, stating that design work between Thomas & Hutton and the Bastion
Group has identified a cost-effective solution to meaningfully improve conditions for those
residents, beyond the original goal of simply avoiding making things worse.
He noted that a change order from the Bastion Group included in the packet reflects a net savings
of $155,000, primarily from reductions in driveway and sod removal work. He cautioned that
this savings figure will likely decrease slightly, as one additional driveway is expected to be
added back into the project, and will be further offset by an additional sodding cost of
approximately $25,000 through the City's landscaper. Administrator Kerr said that while there
are many moving parts to this project, he believes the more challenging aspects are largely
complete, with smoother progress anticipated going forward.
Mr. Karkowski agreed and believes the project will be completed in mid-to-late September.
2
Due to the patchwork of repaving along the project area, Administrator Kerr said staff is looking
into the feasibility of moving the repaving of Waterway Boulevard up on the County’s paving
program. He added that it could still be 1-2 years away.
When asked about future change orders, Mr. Karkowski there is still one deduct change order
coming. The project will end within budget. A final change order is expected to line up the
contract with the project.
Director Asero reported that ground disturbance areas have largely been restored to their original
condition, with pine straw and mulch reapplied in appropriate areas and hydro seeding used in
areas that previously had grass. He noted that the City has the capability to water the seeded
areas using a large jet tank if dry conditions arise, though he expressed confidence the grass
would establish well with minimal watering, particularly given that August and September are
typically the area's wettest months and August rainfall this year has been above average.
4. New Business
B. Discussion and consideration of Waterway flood barrier project – Thomas &
Hutton CO#6, $35,000 for additional field management expenses
Mr. Karkowski said this project and the area residents have been very “needy.” This change
order amount reflects the amount of time spent on the job including working with SCDOT,
AT&T, and weekly visits required by the grant.
MOTION: Council Member Pierce made a motion to approve and recommend the
change order to the Ways & Means Committee for consideration. Council Member
Streetman seconded the motion. The motion passed unanimously.
C. Discussion of Waterway flood barrier project – Thomas & Hutton CO#7, $63,550
for feasibility/planning work for Phase 3 of Waterway flood barrier
Administrator Kerr provided an update on Phase 3 of the Waterway Boulevard project, which
has historically been conceptualized as a wall behind five or six affected property owners to
prevent flood cresting into their yards and across Waterway Boulevard. He noted that a related
issue involving Wild Dunes property owners behind Fire Station 2 — originally part of Phase 2
— has been moved into Phase 3 due to ongoing conflicts, requiring the City to either secure
WDCA buy-in on a proposed solution or develop an alternative approach near the station or
along 41st Street.
Regarding the five property owners, Administrator Kerr reported that the City has been in
contact with three of them and noted that, unlike property owners in earlier project sections who
experienced severe flooding, these owners face a lesser and more varied degree of impact, with
uncertainty as to whether all five will be cooperative. He emphasized that staff are not seeking
approval at this time, but wanted to inform the Committee and Council that solutions for both
areas must be developed before Council consideration, and that the City intends to hold
individual or group meetings with the five owners to gauge willingness to participate.
3
He explained that the item up for consideration is a feasibility study intended to develop two or
three conceptual options for each area, along with cost and impact analysis, to guide a future
decision. Once Council selects a preferred option, that selection would trigger full design work,
including survey-grade data collection. Briefly touching on the options under consideration,
Administrator Kerr and Mr. Karkowski described one alternative involving a gradual, localized
raising of Waterway Boulevard to maintain flood protection if the affected property owners
choose not to participate, and noted that this and other options carry varying implications,
including potential coordination with SCDOT, the golf course, and private property easements.
Administrator Kerr said that if any of the five property owners decline to participate, the wall
solution behind their properties would not proceed, though he added that no owner has yet said
no — only raised questions about the project's necessity for their specific properties, as the need
is less visibly apparent in this section than in previous project areas.
D. Discussion of drainage project for Palm Boulevard and 38th-41st Avenue
Administrator Kerr confirmed a $1 million earmark in the State budget for this project. The
project is 80-90% permitted and is waiting on encroachment permits.
Council Member Pierce wants clarity on the significantly increased cost of this project. He
wondered if there is a more impactful project that could benefit from this funding. Council
Member Streetman said the area has a great need for this project. Administrator Kerr added that
this project has been on the books for many years and he is reluctant to shift focus to another
project this far in.
Committee members discussed phasing options for the project with Administrator Kerr and Mr.
Karkowski. Due to the high probability of costs continuing to increase, Council Member Miars
suggested moving forward with completing this project in phases.
Administrator Kerr asked Mr. Karkowski about next steps for the Palm Boulevard drainage
project, noting that design is complete and permitting is nearly finished, and inquired whether an
additional agreement would be needed for construction administration and bidding services, as
the current contract does not include that scope.
Mr. Karkowski pointed to a permitting caveat involving the Isle of Palms Water and Sewer
Commission. He explained that both the City and the Water and Sewer Commission hold
encroachment permits for the same area, historically on a first-come basis, but SCDOT has
indicated that the City's drainage line — sited at the optimal low point to capture drainage —
occupies the same location the Commission had planned for a sewer line as part of a since-
shelved basin project. As a result, the Commission would need to redesign its project at its own
cost if that project is revived in the future.
To finalize the City's DOT encroachment permit, Mr. Karkowski explained that the City must
also apply, on the Water and Sewer Commission's behalf, for two additional encroachment
permits (for water and sewer relocations), which requires the Commission's signed authorization.
He noted this coordination is currently a sensitive matter and represents a dependency for
completing the overall project. Administrator Kerr confirmed this is a dependency for the entire
4
project, and the two agreed to pursue those conversations with the Water and Sewer
Commission. This will be further discussed at October’s meeting.
5. Approval of Previous Meeting’s Minutes – August 4, 2026
MOTION: Council Member Miars made a motion to approve the minutes. Council
Member Streetman seconded the motion. The motion passed unanimously.
6. Marina Tenant’s Comments – none
7. Departmental Reports
Director Asero gave a report of the status of the Public Works Department after his first 90 days
as director. That presentation is attached to these minutes.
He will report back to the Committee with more specifics after the first of the year.
8. Old Business
B. Update and discussion of beach projects
Administrator Kerr said the work at Reach 1 is complete. Marinex is now working in front of
Beachwood East. He said it has been challenging to keep on top of sandbag removal since the
sandbags need to be removed before Marinex reaches the area. The City continues to work
closely with CS&E and Marinex to keep the public informed of the project’s progression.
Administrator Kerr noted that Marinex has expressed a willingness, given its home base in town,
to guarantee the City's current project pricing into the future in exchange for a certain amount of
guaranteed future work, with the primary condition being flexibility in scheduling their work.
C. Update and discussion of marina parking lot reconfiguration
Administrator Kerr reported that this project is out to bid, and bids are due at the end of
September. The Public Services & Facilities Committee will consider the bids at their October
meeting. He said if the heavy liquidated damages clause prevents companies from bidding, the
project will be pulled until next year.
The City is working with Islander 71 on their request for additional lighting in the parking lot.
D. Update on Marina dredging project work schedule
Administrator Kerr said that GeoSynTech (formerly ATM) is waiting to hear from USACE on
permission to use the spoil site. Once that permission is received, the project will go out to bid.
E. Discussion and consideration of amending trash collection policies as they relate to
commercial operations
Director Asero reviewed the changes to the proposed ordinance, noting changes affect
contractors and not residents. He believes it will reduce the number of large debris piles.
5
MOTION: Council Member Pierce made a motion to approve the ordinance following
cleanups mention by Director Asero. Council Member Streetman seconded the motion. The
motion passed unanimously.
9. New Business
A. Discussion and consideration of proposals to manage bulkhead recoating
Administrator Kerr said the recoating of the marina bulkhead is budgeted this year after the
existing coating degraded faster than expected. He explained that the next step would be
engaging a professional consultant to study the cause of the failure, likely related to surface
preparation, and to specify a new preparation process and coating intended to achieve a longer
duration than the current application. Staff obtained two proposals: $33,000 from ATM
(Geosyntec/ATM), the City's longtime marine consultant, and $60,000 from John Gary Taylor
(JGT), who also handles dredging permitting for other entities in the area. Administrator Kerr
noted that GeoSynTech’s proposal included a smaller on-site presence allowance (approximately
$4,000) during construction compared to JGT's more extensive on-site proposal, but expressed
confidence in recommending GeoSynTech based on the City's prior experience with the firm,
noting the scope would include developing specifications, managing bidding, and overseeing
construction.
Council Member Pierce asked for assurance that the recommended allowance would sufficiently
cover on-site oversight during construction without resulting in additional change orders.
Administrator Kerr confirmed GeoSynTech had performed the original coating work and, when
asked whether the firm could explain the prior failure, indicated GeoSynTech suspects the issue
stemmed from surface preparation and possible electrolysis affecting the wall, though the exact
cause may never be fully determined. GeoSynTech’s expectation is that the wall will likely need
to be brought back down to bare metal and recoated from scratch.
E. Discussion and consideration of A/V RFP responses
Administrator Kerr said 4 proposals were received for this project and had a wide range of
pricing. He explained the proposed upgrades include higher resolutions, more camera angles, and
upgraded equipment. Improvements to the A/V capabilities in Council Chambers will likely be
incremental, specifically related to the closed captioning as there are governmental regulations
involved.
Administrator Kerr said staff would like to negotiate with the proposal with Sharpe. Council
Member Pierce expressed support for that effort.
MOTION: Council Member Pierce made a motion to approve staff negotiating the
proposal from Sharpe. Council Member Miars seconded the motion. The motion passed
unanimously.
6
F. Discussion and consideration of IT RFP Responses
Administrator Kerr said staff received over 20 responses to this RFP. Staff would like to narrow
down the number of RFPs for the Committee to consider and have a Special Meeting later in the
month to review them then make a recommendation to City Council for consideration.
The Committee will hold a Special Meeting at 9am on September 23 to make a recommendation
on the IT RFP.
G. Consideration of purchase of new truck for Building Department, $37,686, Santee
Automotive, State Purchasing Contract (FY27 Capital, $45,000)
MOTION: Council Member Miars made a motion to approve, and Council Member
Pierce seconded the motion. The motion passed unanimously.
10. Miscellaneous Business
The next regular meeting of the Public Services & Facilities Committee will be Tuesday,
October 6, 2026 at 9am.
11. Adjournment
Council Member Miars made a motion to adjourn and Council Member Streetman seconded the
motion. The meeting was adjourned at 10:50am.
Respectfully submitted,
Nicole DeNeane
City Clerk
7
Public Services
Departmental
Assessment & Outlook
1 September 2026
City of Isle of Palms
Presented by PS Director, Robert Asero
8
Agenda
• Purpose
• Bottom Line
• Organizational Review
• Vision and Department Functions
• Detailed Assessment
• Staff / Fleet / Facilities
• Key Findings
• Key Conclusions
• Moving Forward
• Discussion and Questions
2
9
Purpose
The Public Services Department exists to
provide reliable, equitable, and
community-centered services.
Improvements to operations and delivering
responsive, transparent service through
collaboration, innovation, and responsible
stewardship of public resources. Our
purpose is to ensure that every interaction
with our department reflects
professionalism, accountability, and a
renewed dedication to serving the
community with integrity.
310
Bottom Line
• In the short term, PS has sufficient personnel, equipment,
and facilities to perform daily operations, with no
immediate resource shortfall that threatens service
delivery.
• The principal near operational risk is the aging sanitation
fleet and its effect on vehicle maintenance cost, reliability,
and operational flexibility.
• New ideas that challenge the status quo on operations will
be considered to achieve efficiencies, save on cost, and
address regional growth that impacts IOP .
4
11
Organizational
5
Director
Assistant
director-vacant
Stormwater
Foreman CDL
Sanitation
Foreman CDL
10 CDL drivers
5-11 temporary
staff
Facilities
• 800 sq ft office
• Maintenance garage
• Wash station
• 40-foot storage
container
• Fueling station
• City owned trash
compactor
CURRENT FLEET
2008 Mack w/ 31yd Loadmaster Packer (PW22)
2009 Mack w/ 31yd Loadmaster Packer (PW24)
2014 Mack w/ 30yd Packer (PW26)
2016 Mack w/ 30yd Packer (PW16)
2018 Mack w/ 30yd Packer (PW28)
2025 Mack w/30yd Packer (PW 40)
2006 Caterpillar wheel loader
2022 Caterpillar wheel loader
2020 Mack dump truck (PW 21)
2018 Mack dump truck (PW 27)
2022 F150 4x4
2025 F150 4x4
2016 Ford F350 4x4 with hopper
2017 Ford F250 with hopper
2019 Dodge Ram 1500 4x4 (PW-30)
2019 Dodge Ram 1500 4x4 w/ 6 ft bed (PW-29)
2023 Chevy 3500 HD for storm water (PW34)
Obrien jet Vac trailer
JCB mini excavator
JCB skid Steer
12
Vision and Department Functions
6
Department Functions:
• Sanitation*
• Stormwater Management*
• Personnel Management
• Training
• Contract and Vendor Management
• Facilities Maintenance / Emergency
Support
• Fleet and Equipment Management
• City owned asset management
The Future of the Public Services Department
The future of the Public Services Department is defined
by modernization, efficiency, accountability and
strategic investment. Innovative operations,
sustainable practices and high-quality service delivery
will help form the foundation of a department prepared
not only for current demands, but for the challenges
and opportunities of the next decade
13
Staff
7
Internal changes to public services staff
Reorganization of job descriptions duties
Public Services Assistant Director position
Reduction of temporary labor cost
Redefine temporary labor job descriptions and
duties
14
Fleet
8
Streamline sanitation route collections
Implement side loading operations
Update aging fleet FY 27 or ASAP
Update fleet accordingly to fit current size and
needs
Reduction vehicle maintenance budget
Sanitation fleet tonnage audit
15
Public services facilities
9
Update Update service garage, equipment and tools
Create Create more yard space for city vehicles to
access fuel station and DEF storage
Update Update Public Services offices and facilities
16
Additional Key Findings
• Sanitation and Stormwater foremen positions are key enablers for Director for PS operations.
• Update solid waste ordinance for operations reduction of volume.
• Use of temp labor is effective but has drawbacks that may outweigh value in long term.
• Combination of niche equipment like the Jet vac when combined with targeted drainage contracts
has proven highly effective in maintaining our drainage systems. This is a good example of right
sizing the servicing of a requirement.
• PS main site is a likely candidate for substantial refurbishment.
• Critical gap identified is administrative actions such as processing purchase orders and crafting
RFBs. Possible area of improvement for senior staff and consideration in Deputy hire.
• Training and professional development program is an area that could be improved.
• New beach trash contracts are proving highly effective and flexible.
10
17
Key Conclusions
11
Organizational structure and staffing level are generally
adequate for current operations, but administrative capacity
and workforce development require improvement.
Sanitation operations are the center of gravity for PS
Department. The critical requirement for sanitation is the
sanitation fleet.
Aging sanitation fleet coupled with rising maintenance costs
necessitates reevaluation of operational approach.
More efficient sanitation operations will enable better
fulfillment of other PS functions throughout the city
The current PS facility remains functional but requires a
comprehensive condition/needs assessment.
Targeted contracting and specialized in-house capabilities can
be combined to improve efficiency without unnecessarily
expanding permanent staff or fleet.
18
Moving
forward
• Sanitation Fleet
Develop a sustainable sanitation operating and fleet-
replacement strategy. 10 year capital plan
• Streamline sanitation route collections
• Implement side loading operations
• Update fleet accordingly to fit current size and needs
• Reduction vehicle maintenance budget
• Workforce Development & Administration
Strengthen training, professional development, and
administrative capacity.
• Public Services Main Site
Conduct a comprehensive facility condition and needs
assessment.
• Operational Efficiency
Continue evaluating the how we perform our functions,
particularly sanitation.
12
19
Discussion and Questions
13
20
Monthly Report
September 2026
Isle of Palms Recreation Department
Programs, Group Fitness, Athletics & Special Events
Adult Classes: Fitness Classes and Programs with top participation: Core & More (15), Strength (14), Ropes &
Resistance (21), Move-It (18), Stability & Strength (13), RXFit Club (13), Dog Obedience (20) and Line Dancing (12).
Youth Classes: Art (32), Gymnastics (13), Safe Sitter Babysitting Course (9), Sing Play & Learn (8), and Tiny Chefs (6)
Beach Yoga: Tuesdays at 7:30am through Oct. - 25th Ave Beach Access. Approximately 20 people per week.
Keenagers: Wednesday, September 2 at Noon. (41) people attended the luncheon and Carroll Brown performed.
Farmers Market, Food Truck Jam, Thursday, Sept. 17. 54 vendors onsite, live music and great community support.
Speaker Series: Guardianship- September 8 at 6pm (1) and IOP Compost Program - September 18 at 11am (3)
Sea Stroll & Learn: Thursday, September 10 - 13 participated.
Art at the Rec: August 3 - October 31 the Recreation Center’s hallway & lobby are turning into an Art Walk,
showcasing local talent. September artist - Robert M. and Gieselle Harrington
Mahjong Tournament: Wednesday, September 23 at 10am. (28) people participated.
Adult Athletics: All leagues started the 1 week of September. 6 v6 soccer - 4 teams, 48 players. 3 on 3 Basketball - 6
teams, 36 players and Table Tennis - 8 players participating.
st
Youth Athletics: Soccer season and practices started the last week in August and the official season started
September 28. Big Shrimpin food truck will be onsite to serve as concessions for the opening game.
Operations
IOP Connector Run: monthly meetings with board for preparations and planning of the 5K & 10K Run on October 3.
Exterior lights: working on bids and information to improve lighting. Quotes from Shine Construction and NetZero.
Recreation Newsletter: re-establishing recreation newsletter - scheduled for October 1.
Regional Directors Meeting: Wednesday, September 23 at Noon at Mt. Pleasant Public Services Facility.
Hiring: Recreation Assistant - part-time positions: scorekeepers, front-desk, evening and weekends.
Outdoor Basketball goal replacement: contacting vendors and receiving quotes.
10 year capital plan updates. Projects, equipment and updated quotes.
PARD Grant letter of intent submitted September 25, 2026.
Maintenance & Repairs
Upcoming Programs, & Events
IOP Connector Run: Saturday, October 3 at 8am. Connector closes at 7am. Expect traffic delays.
Keenagers: Wednesday, October 7 at Noon. Covered dish lunch and entertainment. Free
Puzzle Competition: Friday, October 9 at 10am. Currently 8 teams are registered.
Sea Stroll & Learn: Thursday, October 1 at 7:30am – IOP Public Dock and Marina
Sea Stroll & Learn: Thursday, October 8 at 7:30am - Surf fishing, 25 Ave Beach Access. th
Youth Basketball: Registration starts October 6 for Isle of Palms and Sullivan’s Island residents and October 13 for
non-residents.
Farmers Market & Food Truck Jam: Thursday, October 15 from 4pm - 7pm. Last Market of the season.
Youth Volleyball League Play: Thursday, October 15 for grades 2 - 8. Currently 11 people are registered .nd th
Ghostly Tide Tales: Friday, October 16 at 6pm. Front Beach, Isle of Palms. Storyteller, Bulldog Tours.
IOP Golf Cart Parade & Carnival: Saturday, October 31 from 4pm - 6pm .
Holiday Street Festival: Saturday, December 5 from 2pm - 7pm. 62 craft and artisans have been selected and 4 food
trucks secured.
Soccer Field: Irrigation valve and nozzle repair for zone 3. Adult and youth field preparations for practices and
games.
Playground: Safety inspection, secured bolts where needed, raked and filled mulch areas.
Baseball, Softball and multi-purpose field: weekly maintenance mow, trim, edge debris and trash pick up.
Building & Ground Maintenance: repaired irrigation at front of building, cleaned and recalked restrooms, replaced
toilet flush valve, cleaned and repainted middle island curb with safety yellow along with no parking areas around
parking lot. Trimmed trees and shrubs in the front of building. Bark Park spigot repair for water source.
Waterway Blvd: mowed 29 Ave - 21 Ave. th st
Charleston County Recycle: contacted and replaced broken recycle cans for around facility. 21
Enrollment Report
September 2026
Monthly Revenues 2026
Annual Comparison
RecTracWebTracTotal
JanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberOctoberNovemberDecember0
10K
20K
30K
40K
50K
60K
70K
2023202420252026
JanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberOctoberNovemberDecember0
10.00K
20.00K
30.00K
40.00K
50.00K
60.00K
70.00K
Participants registering for classes during the month from
August 28 - September 30. RecTrac: in-house registration vs.
WebTrac: online Registrations.
Total registrations for September: 483
Revenue sales brought in by programs, athletics and events.
RecTrac: in-house vs WebTrac: online
Total Revenue for September $20,535
Year to Year
RecTracWebTrac
RecTrac74.9%
WebTrac25.1%
22
20252026
JanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberOctoberNovemberDecember0
2
4
6
8
10
12
14
20252026
JanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberOctoberNovemberDecember0
5
10
15
20
C KIE
Farmers Market &Food Truck Jam
Of EventsOf EventsOf Events
CCaalleennddaarrCalendar
IOP RECREATION
FREEFREE
Cardio Room Daily Average Visits
Open Gym Daily Average Visits
Participants utilizing the gymnasium for open play
Participants utilizing the cardio room
Upcoming Events:
SATURDAY, DECEMBER 52PM - 7PM TREE LIGHTING 5:30PM
FRONT BEACH, ISLE OF PALMS
ISLE OF PALMS
FOOD, CRAFTS, GIFTS, AND LIVE MUSIC,SANTA CLAUS, CARNIVAL RIDES & MORE! HOLIDAY MAGIC AWAITS!
HOLIDAYSTREETFESTIVAL
WORKSHOPWORKSHOP
SANTA’SSANTA’S
DECDEC
1717
4 PM4 PM
4pm - 7pm
Ghostly Tide Tales
6pmFront Beach, IOP
Golf Cart & Halloween
4pm - 6pm Registration now Open!
Coffee & Canines
Saturday, November 14 9-11am the Bark Park
Bring your pup to theIOP REC bark park for amorning of live music,good coffee, and dogfriendly fun!
Live music From Daniel Patrick
Thursday, November 12
7:30am
23
682 Johnnie Dodds Blvd., Suite 100
Mt. Pleasant, SC 29464
843.849.0200
thomasandhutton.com
Project Meeting Notes
Meeting Date Start End Next Meeting Next Time Prepared By
October 1, 2026 9:00 AM 9:30 AM October 15, 2026 9:00 AM RPK
Purpose Location
Waterway Blvd Pathway
Construction Progress Meeting Virtual
Attended By Copies To
Douglas Kerr – City of Isle of Palms
Sean Kuester – City of Isle of Palms
Robert Asero – City of Isle of Palms
Greg Parris – Bastion
Rick Karkowski – Thomas & Hutton
Maria Valenzuela – Thomas & Hutton
Douglas Kerr
Sean Kuester
Robert Asero
Greg Parris
Rick Karkowski
Maria Valenzuela
Summary of Meeting
• Pavement
o Edges, work quality - various remediations to be performed to make asphalt look
better
o Raised path section at 3105/3107 – proceed as is (planned elevation)
o Each resident has dual driveway, so one d/w for each lot to be done, then the other
o Milling and paving work to be done – today/tomorrow. Striping to be done at least 7
days out
o Berm to attain 7.0 ft protection – access for resident to move trash can - crack in
driveway to be fixed
o 25th paving? Robert reported Murry’s concerns. Greg report it will be ok - 6” in 13
feet
• Check valves to be installed soon.
o Robert working with Fordis to clean out pipe valves . 21st has oysters. Greg report
the installation will depend on tides. One pipe is separated – bastion to remove
section and push out of way. Robert to meet them out there when installation starts
• Grates on inlets
o Structure at 3607 (back side) – need grate to limit access, but not cause a clogging
issue. Rick to research and provide recommendation
o Additional structure? - 25th intersection inlet – flume is in line with the pathway
(pathway narrows at the inle). Grate to be installed over the flume to protect
people from walking/riding into flume. Greg to coordinate
• 3011 resident concerns. Claims damage to wooden retaining wall. AT&T box was
relocated in the area
• Greg may be out for the 15th meeting
– End of Notes 24
M EETING N OTES (C ONTINUED )
October 1, , 2026
Waterway Blvd Pathway Project
Above is a summary of the meeting. Notify the undersigned as soon as possible if there are any
discrepancies or misunderstandings with the above notes. Please contact me if you have any questions
or if there are other issues or items requiring attention.
Prepared by:
Rick Karkowski
RICK KARKOWSKI, PE, PH, D.WRE | Principal/Water Resources Manager
THOMAS & HUTTON
p 843 -725-5280 m 843-708-1509
e karkowski.r@tandh.com
a 682 Johnnie Dodds Blvd.; Suite 100 | Mt. Pleasant, SC 29464
vCard | Website | LinkedIn | Facebook | Instagram | YouTube
25
Managed Technology Services Finalist Assessment
RFP 2026-09 | Committee decision paper | 2 October 2026
Executive Summary
Recommend interviews with VC3, Corsica Technologies and Cantey Tech Consulting, in updated score
order. VC3 remains the strongest continuity choice. Corsica offers the lowest comparison cost and broad
included services; its newly supplied references raise its score to second. Cantey remains the strongest
direct municipal and CJIS challenger. Corsica’s current CJIS staffing and comparable municipal
experience still need verification before award.
This paper updates the 14 September assessment using the six TCO submissions and supporting
schedules. The committee previously expanded the original six-firm slate to seven by adding InterDev.
Novatech has now withdrawn, leaving six active finalists. This is an interview recommendation, not an
award or best-and-final-offer determination.
Rank Finalist Score /38 Comparison 3-year TCO Recommendation
1 VC3 33.5 Interview
2 Corsica 33.0 Interview
3 Cantey 32.5 Interview
4 InterDev 30.5 First reserve
5 Merit 29.0 Second reserve
6 SoftSages 22.5 Do not interview now
The figures compare fixed costs for 2027–2029, including Microsoft subscriptions, planning, startup and
other stated fees. Separate continuing VC3 payments and unquantified extra work are excluded. Where
prices conflict, the higher supported amount is used.
Appendix A summary
• If VC3 is selected, its separate Managed Security contract and billing end on 31 December 2026. The
same cybersecurity functions continue within the new managed IT contract from 1 January 2027,
leaving three contracts: managed IT, website and backups.1
• Corsica is lowest at $ followed by Cantey at and VC3 at $ . Merit and
InterDev total and SoftSages is highest at $921,391 using its higher written prices.
• Appendix A separates services, Microsoft licensing and additional-work rates. Corsica offers the best
growth terms and three-year service-price stability. Cantey’s total includes separately priced security
and Microsoft 365 backup enhancements to clarify in BAFO.
1If VC3 is selected, its separate cybersecurity contract and billing end 31 December 2026. Those
functions continue within managed IT from 1 January 2027. The City retains three contracts: managed IT,
website and backups. The quoted managed IT price already includes cybersecurity; no additional credit is
deducted.
26
Evaluation Method and Updated Scoring
Retain the original seven criteria, 0–4 score definitions and weights: Understanding 1; Qualifications 1;
Technical Approach 2; Strategic Advisory 1; Operational Support 1; Pricing and Value 2.5; References 1.
Maximum score: 38. The scoring document contains inconsistent written numerals for Technical and
Pricing; the 2.0 and 2.5 weights used in the September paper control this continuation.
The September paper records aggregate scores, but no criterion-by-criterion ledger. The scores below are
therefore a fresh, explicit application of the same method to the prior evidence and the new submissions.
They are not a reconstructed historical scorecard, and differences from September cannot be attributed
solely to price. No new reference calls, visits or demonstrations are credited.
Criterion Weight VC3 Cantey Corsica InterDev Merit SoftSages
Understanding 1 4 3 4 4 4 3
Qualifications 1 4 4 2 4 3 3
Technical 2 3 3 4 4 4 3
Strategic 1 4 4 4 4 4 3
Operations 1 4 4 3 4 3 3
Pricing/value
References 1 4 4 2 4 2 2
Weighted total 38 max 33.5 32.5 33.0 30.5 29.0 22.5
Score definitions: 0 = unsatisfactory or insufficient information; 1 = marginal with significant deficiencies; 2
= partially meets with notable weaknesses; 3 = meets requirements; 4 = exceptional with meaningful
added value. The table shows unweighted criterion scores; only the last row applies the weights.
Basis for the principal scoring distinctions
VC3 and Cantey earn the highest qualification and reference scores for substantial municipal/public-safety
evidence. Corsica earns strong technical, strategic and pricing scores for its inclusive commitments. Its
references score rises from 0 to 2 after receipt of three named business references; like Merit’s
nonmunicipal references, these provide useful evidence without demonstrating directly comparable
municipal service. Corsica’s qualifications score remains 2 because municipal experience and current
CJIS staffing are not yet substantiated.
InterDev’s municipal portfolio, staffing and reference package remain exceptional; its high cost limits
pricing/value to 1. Merit remains technically and strategically strong, but its higher service price, smaller
bench and nonmunicipal reference list reduce comparative value. SoftSages improves its IOP-specific
operating description, but its price contradiction, missing supporting schedules and unproven current CJIS
bench prevent a stronger rating. Its reference list demonstrates relevant technical work rather than directly
comparable municipal prime-MSP service.
September → October totals: VC3 35.5 → 33.5; Cantey 35.5 → 32.5; Corsica 33.0 → 33.0; InterDev 30.5
→ 30.5; Merit 33.5 → 29.0; SoftSages 30.0 → 22.5. Small gaps are not precise predictions of
performance. Reference scores assess supplied evidence, not completed checks.
27
Findings That Affect the Committee Decision
VC3 security consolidation is a real distinction
VC3’s written commitment and the City’s subsequent clarification establish that, if VC3 wins, the separate
Managed Security contract ends on 31 December 2026. Its functions continue within managed IT on 1
January 2027, with no separate security bill. Website and backup contracts remain in place. The City will
have three VC3 contracts.
This strengthens VC3’s value because the City retains the cybersecurity services while eliminating their
separate charge. The quoted managed IT price already includes those services, so no further security
credit is deducted from VC3’s TCO. Other vendors’ totals exclude the existing VC3 security payments,
which would continue through the existing term unless separately agreed. This distinction favors VC3 but
is not converted into an assumed three-year saving.
Compare services separately from subscriptions
The original $ screen concerned recurring managed services, not a newly expanded total including
the full Microsoft license portfolio. Year 1 services, re uired security, quoted backup additions, formal
plannin and recurring recover charges total $ for Corsica, $ for Cantey, for
VC3, $ for Merit, $ for InterDev and $ for SoftSages using its higher written rates.
Microsoft subscriptions and startup are additional. The target remains a management screen, not a new
eligibility condition.
Arithmetic is sound but commercial comparability is qualified
The workbook formulas add correctly. The comparison uses higher supported prices where descriptions
conflict with numeric cells: SoftSages is evaluated using its higher written core/security rates; InterDev
uses its higher $ onboarding figure. Other matters to confirm are limited to material scope,
licensing and binding price terms.
Cantey explicitly adds $ annually in license tax. InterDev says applicable taxes are included.
Corsica, VC3, Merit and SoftSages leave some tax treatment conditional or insufficiently settled. The
appendix uses the comparison totals and also isolates services/startup excluding Microsoft and separately
itemized tax. It does not presume a tax exemption or apply an invented uniform tax rate.
The comparison is not the entire future IT budget
This comparison covers the vendors’ proposed services. The City will still pay for its existing VC3 backup
and website contracts, and for separately approved equipment or extra work. We have not guessed at
future workloads, replacement services or licensing savings. The BAFO round should settle the remaining
scope and price questions.
28
1 VC3
Recommendation: Interview. Strongest continuity choice, with meaningful security consolidation and
several specific commercial corrections required.
Year 1 Year 2 Year 3 Three years
Commercial position. Year 1 includes managed -user su ort, email -only support,
$ Microsoft licensing, $ advisory services and $ for an annual recovery exercise. No
onboarding charge. The service acka e excluding Microsoft is $ , versus the prior $
headline including advisory; the $ difference is the new recovery -exercise charge.
Capacity and fit. The original proposal reports 600+ employees, 300+ engineering resources and 40+
strategic advisors, with extensive municipal experience and direct knowledge of the City. Its existing
access, records and operational relationships reduce transition risk. Those advantages must be
accompanied by measurable improvements to the service and communication shortcomings
acknowledged in its proposal.
What the TCO resolves
• The existing Managed Security agreement is expressly replaced and its services included. Website
and hosted backup contracts continue. This is stronger evidence than an informal expectation of a
discount.
• Routine onsite support/travel, the 45-device mobile baseline and incumbent transition are included.
The advisory line describes quarterly steering/governance, budget support and a maintained
roadmap.
Items to include in BAFO request
• Included scope: confirm the annual disaster recovery exercise (a test of restoring s stems and data
after an outage) and the required Defender licenses. The comparison retains the $ annual
exercise charge.
• Final price terms: provide one controlling escalation schedule and state taxes and procurement
markups.
• Contract alignment: reflect security consolidation from 1 January 2027 and correct the backup
expiration date. Website and backup services remain under their existing contracts.
29
2 Corsica Technologies
Recommendation: Interview. Second by updated score after receipt of references; best comparison cost
and broad included-service commitments. Verify municipal delivery experience and CJIS staffing before
award.
Year 1 Year 2 Year 3 Three years
Commercial osition. The $ monthly core fee remains fixed for 36 months. Microsoft subscriptions
add $ annually at the selected annual -commitment/monthly-billing terms. No onboarding or other
fixed charges. Its submitted three-year total is $ below Cantey and $ below VC3,
subject to tax, licensing and retained-security differences.
Capacity and fit. The original proposal reports approximately 200 employees and a South Carolina
headquarters. Corsica has now supplied three named business contacts: Aesthetic Partners, Green Valley
Pecan and O’Daniel Auto. These support reference checking for multi-site operations, compliance and
modernization. They do not establish comparable municipal/public-safety experience or current CJIS-
qualified staffing.
What the TCO resolves
• Explicitly includes all baseline quantities, routine onsite support and travel, required critical after-hours
response, normal hurricane preparation, security tooling and M365 administration.
• Includes backup monitoring, restore testing and annual recovery exercise while VC3 retains its backup
platform. Formal annual roadmap, capital/budget support, the initial 120-day assessment and
license/asset review are included.
• Adds users, PCs, mobile devices and servers without additional support fees; PC imaging/deployment
is included even for City-direct purchases. No onboarding, offboarding or data-handoff fee.
• Itemizes all seven Microsoft products in an internal workbook tab. Procurement markup is
Microsoft changes can pass through at renewal. Annual prepayment is an optional lower license price,
not the selected comparison basis.
Items to include in BAFO request
• References and readiness: check the three supplied business references, obtain comparable
municipal evidence and address the original five-reference requirement. Email format itself is not a
scoring deficiency.
• Assigned staff: verify named onsite and backup personnel, CJIS eligibility and authorization steps, and
emergency coverage before award.
• Final price terms: confirm taxes and hourly billing increments. Corsica’s bundled security does not
terminate the City’s separate VC3 security obligation.
30
3 Cantey Tech Consulting
Recommendation: Interview. Strongest municipal and CJIS challenger, with a competitive total that
needs baseline and scope reconciliation.
Year 1 Year 2 Year 3 Three years
Commercial osition. Year 1 includes ore support, $ Microsoft licensing, $
security, $ cloud backup/archiving an license tax. Email -only support, formal planning
and onboardin are quoted at no separate charge. Services excluding licensing/tax total
$h . T h e s u b m i t t e d t h r e e-year total is $ below VC3 before any confirmed security -
contract savings.
Capacity and fit. The original submission reports 126 employees, a dedicated municipal/critical-
infrastructure team and South Carolina offices, including Charleston. Named municipal police references
and CJIS/SLED experience directly address the City’s public-safety needs. Cantey remains the most
credible lower-cost challenger on demonstrated municipal specialization.
What the TCO resolves
• The mixed Microsoft portfolio replaces the prior generic Exchange-only assumption. Routine
onsite/travel, after-hours support, annual recovery exercise, formal planning and transition are included
in the described core services.
• The security attachment deducts for overlap with VC3 from Cantey’s own compliance
program. This credit is already reflected in the $ security line; it is not an additional City
credit and must not be deducted twice.
Items to include in BAFO request
• Coverage and enhancements: confirm City baseline quantities, separate required protection from
optional cybersecurity and Microsoft 365 backup/archiving enhancements, and demonstrate no
duplication of retained VC3 services. All quoted costs remain in the comparison.
• Final price terms: confirm Microsoft products, taxes, annual increases, procurement markups and the
City’s three-year term with two optional one-year renewals.
• Growth charges: explain when added-user and device charges apply so the same support is not billed
twice.
31
4 InterDev
Recommendation: First reserve. Strong municipal alternative if the committee accepts a material
premium or Corsica cannot close its evidence gaps.
Year 1 Year 2 Year 3 Three years
Commercial position. Year 1 comprises $ core support, email -onl support, $
cybersecurity, $ formal planning, Microsoft licensing and $ onboarding.
On oin services excluding Microsoft equal $ h. Its three -year comparison total is
$ above VC3’s proposed total and second highest among the six.
Capacity and fit. InterDev reports 52 employees, including 42 technical staff, more than 30 municipal
clients and a Beaufort regional office. Its reference package includes named municipal customers and a
City of Beaufort recommendation letter. The previous concern was cost, not capability; the new
submission reinforces that distinction.
What the TCO resolves
• Explicitly covers 45 mobile devices with MDM licenses and confirms routine onsite/travel, critical after-
hours response, normal hurricane preparation and ordinary MSP tools in core.
• Separately identifies $ of security labor reallocated from core plus $ of endpoint
licensing in Year 1; the labor is not double-counted.
• Includes required backup monitoring, periodic restores and one annual disaster recovery exercise
while retaining VC3’s platform. It clearly excludes the separately retained VC3 security scope and
website services.
• Microsoft detail includes all seven products, annual billing and a disclosed embedded reseller markup.
No extra software markup is added to those quoted license prices. Applicable taxes are stated to be
included.
Items to include in BAFO request
• Onboarding: use $ the higher of the numeric figure and the $ narrative figure. Obtain
a final schedule confirming that amount.
• Price changes: confirm the ncreases and distinguish assumed licensing increases from
actual publisher renewal prices.
• Delivery and growth: confirm the assigned local team and how added-user/device charges apply. A
primary PC included with an added managed user must not be charged again.
Why not in the initial three. The qualifications are among the best, but the cost premium is substantial. A
premium may be justified if lower-cost alternatives fail the City’s readiness or service requirements; the
present evidence does not show that this extra expenditure is necessary. Place InterDev ahead of Merit in
reserve because its municipal record and reference evidence are stronger.
32
5 Merit Technologies
Recommendation: Second reserve. Technically strong and lower-priced than InterDev, but the new total
weakens its previous near-target value case.
Year 1 Year 2 Year 3 Three years
Commercial position. Year 1 includes core support, $ email -only support, $
Microsoft licensing and $ formal planning; onboardin is included. Services excludin Microsoft total
$h . T h e t h r e e -year submitted cost is $ above VC3, but $ below
InterDev.
Capacity and fit. The original proposal reports 35 employees and current CJIS-qualified engineers across
South Carolina jurisdictions. This is a credible specialist firm, but the bench is materially smaller than the
largest finalists. Its five supplied references are commercial, professional, residential-care and faith-based
organizations rather than municipalities; those references do not substantiate the same direct municipal
MSP record demonstrated by VC3, Cantey or InterDev.
What the TCO resolves
• Includes routine onsite support/travel, 24x7 critical response without a dispatch fee, normal hurricane
preparation, recovery monitoring, restore tests and the annual exercise. Engineers are described as 1–
2 hours from the City.
• Removes the separate replacement backup platform and excludes VC3-retained training, dark-web,
external scanning and vCISO services. Includes M365 backup for managed and email-only users and
backup for key workstations.
• Confirms no onboarding, offboarding, export or handoff charge. Support escalation is capped at the
lesser of 3% or CPI; the dollars use the maximum .
• Adds 50 hours of formal annual planning for $ beyond 50 executive -advisor hours included in
core. This is a substantial advisory allowance, but the City should ensure the extra block matches the
requested deliverables.
Items to include in BAFO request
• Licensing and taxes: confirm the exact Government products, quoted unit prices and full payable
amount.
• Incident response: define included restoration and stabilization versus separately authorized extended
remediation.
• Delivery and planning: verify municipal experience, concurrent-incident staffing and the deliverables for
the 100 total advisory/planning hours.
Why not in the initial three. Merit has meaningful technical and advisory strengths, but no longer sits at
the original approximately $ service target. The larger fixed commitment does not yet overcome
Cantey’s municipal fit or Corsica’s lower-cost service model. It remains a reasonable alternate if the City
gives greater weight to its advisory depth and technical package.
33
6 SoftSages Technology
Recommendation: Do not interview in the initial round. Improved service detail is outweighed by a
materially higher and internally inconsistent commercial submission.
Year 1 Year 2 Year 3 Three years
Commercial position. Numeric entries total $ h before Microsoft in Years 1 –2 0 core,
security and 0 planning. They increase 3% in Year 3. The written descriptions instead say
0 core and security, which with planning total h. This is a material price
conflict, not rounding.
For this evaluation, the higher written rates are used: core plus security, with
$750/month lanning. A l in the submitted Year 3 escalation produces a three -year comparison total of
which is above the numeric -cell total. This is the City’s conservative comparison
calculation, pending a confirmed vendor schedule.
Capacity and fit. SoftSages reports 350+ professionals and public-sector work, but its references mainly
cover technical work rather than comparable municipal prime-provider service. CJIS readiness is not
demonstrated: it promises to complete checks and training at its own expense but has not substantiated a
currently qualified, assigned team ready for City access. This is a readiness gap, not proof that it cannot
qualify.
What the TCO improves
• The service narrative is more specific to IOP: weekly Charleston-area onsite presence, next-business-
day dispatch, four-hour critical dispatch, 45 mobile devices, named application categories, routine
travel and critical after-hours coverage.
• Includes monitoring, quarterly restore tests, annual disaster recovery/tabletop exercise and recovery
documentation. Onboarding is explicitly free; offboarding includes up to 40 hours of assistance.
• Identifies growth bands, procurement markups and project rates, and separates retained VC3 security
from supplemental protection.
Items to include in BAFO request
• Final price: confirm the higher comparison amount in one signed schedule and supply the
missing Microsoft and additional-rate attachments.
• Included response: define critical recovery responsibilities and any extra-charge boundary without
importing a limit from VC3’s separate contract.
• Coverage and readiness: confirm security endpoint counts, nonduplicative growth charges and named
personnel eligible for CJIS access. Sales taxes remain additional.
Assessment. Give credit for the improved City-specific operating description, but it does not establish
current CJIS readiness or offset the price uncertainty and increase from the origina headline. The
firm remains active; this is a recommendation against using one of the initial three interview slots, not a
formal nonresponsiveness finding.
34
Committee Interview Priorities and Next Steps
Approve interviews with VC3, Corsica and Cantey. Corsica’s three business references have been
received and credited; municipal experience and CJIS staffing still need verification. If its delivery
capability cannot be substantiated, advance InterDev. Merit remains second reserve. Interview selection
does not approve exceptions or commit the City to award.
Novatech withdrawal
Angel Miranda’s 1 October 2026 email states that Novatech decided not to continue because it was not
“CJIS certified,” notwithstanding other compliance certifications. Novatech framed the decision as
protecting the City’s safety. Record it as a voluntary withdrawal; do not assign a new score or include it in
the cost ranking.
The City’s clarification distinguished applicable CJIS compliance and personnel authorization from a
separate company-level certification. Accordingly, the withdrawal note records Novatech’s stated reason
without implying that the City imposed a new corporate certification requirement or formally disqualified the
firm.
Confirmed security consolidation
The City has confirmed the security contract ends on 31 December 2026 if VC3 is selected. The functions
continue in the managed IT contract from 1 January 2027 without separate security billing. No additional
credit is deducted from the already inclusive proposal. Website and backup agreements continue
separately.
35
Appendix A Total Cost of Ownership Comparison
All amounts cover the three comparison years, 2027–2029. Submitted scheduled costs include Sections A
and C of each finalist’s pricing form. Figures below are rounded to the nearest dollar for readability;
calculations retain cents. Rank here is cost order, not the overall recommendation.
Firm 2027 2028 2029 3-year total Avg /month
Corsica
Cantey
VC3
Merit
InterDev
SoftSages
The average spreads startup costs across 36 months; it is not a monthly invoice. Totals exclude
continuing VC3 payments and variable work. SoftSages uses the higher written rates, producing
$921,391.10 rather than its $775,951.10 numeric-cell total. InterDev uses the higher onboarding charge.
These choices apply consistently throughout this paper.
Services and startup without Microsoft subscriptions
To isolate provider economics, subtract each vendor’s Microsoft line and separately itemized tax from its
scheduled total. This view retains all other fixed charges, including formal planning, Cantey’s
security/backup additions, VC3’s recovery exercise and InterDev’s onboarding. It is a comparison subtotal,
not the total amount the City would pay. Embedded taxes cannot be isolated from InterDev’s quote.
Firm Year 1 recurring services /mo. 3-year services and startup Onboarding included in
subtotal
Corsica
Cantey
VC3
Merit
InterDev
SoftSages
Treatment of retained services
Retained agreements: the prior packet reports security at $1,158.31/month (July review), backups at
$11,995/year and website/hosting at $8,526/year. The existing terms end 31 August 2027, 16 April 2028
and 31 January 2028, respectively, subject to confirming the backup date. If VC3 wins, the security
agreement instead ends 31 December 2026.
From 1 January 2027, VC3’s new managed IT price includes the security functions with no separate bill.
Do not deduct another credit. Other finalists leave the existing security obligation in place. Backup and
website remain separate; no extensions or replacement prices are assumed.
36
Appendix A Fixed Cost Components
Three-year amounts by cost category. SoftSages uses the higher written core and security rates; InterDev uses the higher onboarding figure.
All other fixed amounts follow the submitted schedules. Zero means no separate charge, not an absence of service.
Cost component VC3 Cantey Corsica InterDev Merit SoftSages
Core managed IT
Email-only support
Microsoft subscriptions
Other required licenses
Cybersecurity
Additional backup / archiving
Storage
Disaster recovery in Section A
Formal annual planning
Other recurring advisory
Onboarding
Other one-time costs
Separately itemized tax/fees
Section C recovery exercise
TOTAL
Cantey checked a ainst source: cybersecurity totals Microsoft 365 backup/ archiving
totals $ Security already includes its $1,158.31/month VC3 overlap deduction. These are proposed enhancements, not
payments for VC3’s retained contracts. Keep them in the total until BAFO establishes required versus optional scope and confirms no
duplication.
Cantey’s complete three-year total remains VC3’s recovery exercises remain included. InterDev uses the higher $
onboarding figure; SoftSages uses its higher written core/security rates. No assumed workloads or replacement services are added.
37
Appendix A Microsoft Licensing Reconciliation
Monthly unit-price equivalents for the seven required products. Quantities are the City’s comparison baseline and overlap; they must not be
added to infer headcount. These are submitted prices, not independently validated publisher rates.
Product Qty VC3 Cantey Corsica InterDev Merit SoftSages
Teams Essentials 15 4.73 4.00 3.60 4.00 4.00 Not itemized
Exchange Online P1 Gov 86 4.20 4.00 3.60 4.00 4.00 Not itemized
Exchange Online P2 Gov 1 8.40 8.00 7.19 8.00 8.00 Not itemized
Defender Office 365 P1 Gov 123 0 separately 2.00 1.80 2.00 5.00 Not itemized
Entra ID P1 Gov 124 6.30 6.00 5.93 6.60 4.00 Not itemized
Microsoft 365 G3 Gov 51 37.80 36.00 35.05 39.00 36.00 Not itemized
Project Plan 1 Gov 1 10.50 10.00 8.99 10.00 10.00 Not itemized
Year 1 annual total
Billing and comparison qualifications
• VC3: the stated unit rates reproduce $ annually, but Defender is zero separately rather than 123 expressly priced su bscriptions.
Confirm coverage and terms before treating this as the complete common basket.
• Cantey: $ nnually, annual commitment re aid b Cantey and billed monthly to the City; the attachment labels pricing b udgetary
and pending distributor/SKU/markup validation. annual tax is elsewhere in the TCO.
• Corsica: annual commitment billed monthly at $ . Its optional annual -prepay schedule is $ saving $ at
quoted rates; it is not substituted into the main comparison. Verify Government product equivalence for the Teams and renamed
Project/Planner entries.
• InterDev: selected annual commitment with annual billing is $ in Year 1. A assumed increase produces $ a nd
$i n Y e a r s 2 –3. The embedded reseller markup is not charged again.
• Merit: $ annually at stated cost without markup. Resolve the Defender and Entra unit rates and confirm exact SKUs and billing
frequency. Future publisher changes remain pass-through.
• SoftSages: $ in Year 1 with assumed increases. The referenced Attachment 1B was not supplied, so the seven unit p rices
cannot be reconciled. Do not credit suggested license-right-sizing savings before validating assignments.
Licensing escalation is not uniform: VC3, Cantey, Corsica and Merit hold current license figures flat for comparison, while InterDev assumes
5% and SoftSages 3%. All reserve some exposure to actual publisher changes. The service-only comparison on the preceding portrait page
separates this difference without inventing a common future license price.
38
Appendix A Additional Work Rates
Year 1 rates only. No assumed quantities are applied and no amounts below are added to the fixed TCO. Included means no separate vendor charge for the
described allowance; it does not mean the City receives unlimited new equipment, storage or projects.
Charge trigger or unit VC3 Cantey Corsica InterDev Merit SoftSages
Added managed user /mo.
Added email-only user /mo.
Added PC /mo.
Added mobile /mo.
Added server /mo.
Added backup /TB/mo.
Added storage /TB/mo.
Extra recovery work /hour
PC setup /PC
Extra onsite /hour
Extra travel
Noncritical after-hours /hour
Project engineering /hour
Hardware markup
Other software markup
Procurement marku is added to the vendor’s purchase cost. Cantey enters 20% but describes 20–30%; use 30% pending BAFO confirmation
($ ). City -direct purchasing is also offered. No purchases are assumed in TCO.
Best growth terms: Corsica. Added users, PCs, mobile devices, servers and PC setup are included in support. Equipment and Microsoft
subscriptions remain extra. Other firms charge for some growth; InterDev includes one primary PC per added managed user. Confirm Corsica’s
commitment in BAFO.
Best price stability: Corsica, with flat core and additional-work rates for three years. Microsoft renewals may change. Cantey generally rises 2%,
Merit up to 3%, VC3 approximately 4% (text conflicts), and InterDev 5% annually. SoftSages rises 3% in Year 3 after two flat years but starts
much higher.
39
Appendix A Evidence and Reconciliation Index
The source locations below let the committee or staff trace the principal findings. Spreadsheet references
are to Finalist Pricing Form unless another tab is named. Original-proposal page references below use
PDF page order, which may differ from printed page labels.
Controlling assessment and scope
• RFP_2026-09_14SEP26_v2.docx: executive summary, evaluation method, six recommended firms
and InterDev assessment; the basic outline and qualification findings form the starting point for this
sequel.
• Evaluation Criteria RFP 2026(3).docx: 0–4 score definitions and seven weights, interpreted
consistently with the September assessment. Original RFP and Addendum 7: base support, licensing,
retained-service coordination, CJIS personnel and three-year term requirements.
• IOP_IT_TCO_V4.xlsx and TCO_Cover_Letter_V4.docx: issued comparison quantities, costs-only
response structure and continuing VC3 agreement descriptions. Current counts include 45 mobile
devices.
New submissions reviewed
• TCO_VC3.xlsx: rows 12, 16, 18, 24–26, 39–41, 54, 59–60, 69–70 and 76. Re_ RFP 2026-09 Managed
IT Services Isle of Palms, SC.pdf: Dustin Tucker email, 1 October 2026, expressly replacing Managed
Security and continuing backup/website agreements.
• TCO_Cantey.xlsx: rows 8, 16–18, 31–32, 39, 46–48, 59–61 and 76.
TCO_Cantey_Cybersec_Pricing.pdf: all three pages, including quantities and embedded overlap
credit. TCO_Cantey_MS_Licensing.pdf: both pages, including budgetary status and billing terms.
• TCO_Corsica.xlsx: pricing responses and MS Licensing Detail tab. Corsica_Refernces.pdf: Nate
Troyer email dated 2 October 2026, providing three business reference contacts; reviewed for the
revised reference score.
• TCO_Interdev.xlsx: rows 16, 28, 39, 46–60 and 74–76. TCO_Interdev_MS_Licensing.pdf: both pages,
including selected billing basis, embedded markup and assumed escalation.
• TCO_Merit.xlsx: rows 8, 24, 39–41, 50, 56, 61 and 76. TCO_Merti_Lic_Sched.xlsx (filename as
supplied): Microsoft Licensing rows 8–21.
• TCO_Soft_Sages.xlsx: rows 8, 12, 16, 22, 24, 39, 41, 46–61 and 70. Referenced Attachments 1B/1C
were not in the supplied set.
• Managed IT RFP.pdf: Angel Miranda email, 1 October 2026, recording Novatech’s withdrawal and
stated CJIS reason.
Original qualification evidence used for scoring
VC3.pdf: PDF pages 4 and 9, organizational depth and municipal references.
Canty_Tech_Consulting(2).pdf: pages 9–10 and 13–14, municipal team and references; page 11, original
commercial terms. Corsica_Technologies(2).pdf: pages 3 and 8, original qualification claims;
supplemented by the 2 October reference email. INTERDEV(2).pdf: pages 4–5 and 13–14, staffing,
municipal clients and Beaufort reference. Merit_Technologies(2).pdf: pages 5, 8 and 11, staffing, CJIS
claims and nonmunicipal reference list. SoftSages(2).pdf: pages 9–10, reference scope and original
pricing. No new reference-check results are assumed.
40
41
42
44
From: Josh Uys
To: Douglas Kerr
Cc: Nicole DeNeane; Sean Kuester; Karrie Ferrell
Subject: Re: October 6 agenda
Date: Wednesday, September 30, 2026 1:58:03 PM
Attachments: img-e68737bc-db39-435e-b731-0c6bc860a3fe.png
img-1066402a-34b3-4e5e-bc66-a884f58b2346.png
img-e332b4a5-7c87-4bb9-9fc5-4a4106b4f018.png
img-9f037e78-44eb-4965-9d48-58c7f40b33b4.png
Sharp Council chamber AV diagram.pdf
Douglas,
Sharp is working on two projects with us:
1. For the council AV system, they’ve provided an updated proposal ($45,713 down
from $54,993). I worked with them on simplifying the set up a bit, removing video
switchers, and instead using broadcasting software for all our mixing and camera
switching, identical to the work flow I used at the March Town Hall.
They agreed a Mac Studio will be capable of carrying the additional weight.
2. Sharp is also going to visit the Rec Center next week (10/07) to get an
understanding on what sort of upgrades we are looking for there.
Thanks,
Joshua Uys
Public Information Officer
City of Isle of Palms
1207 Palm Blvd
PO Box 508
Isle of Palms, SC 29451
(P): 854-837-2330
Connect with IOP!
From: Sean Kuester <SKuester@isleofpalms.gov>
Date: Wednesday, September 30, 2026 at 1:06 PM
To: Robert Asero <rasero@isleofpalms.gov>; Karrie Ferrell <kferrell@isleofpalms.gov>;
Josh Uys <juys@isleofpalms.gov>
Cc: Nicole DeNeane <Nicoled@isleofpalms.gov>
Subject: FW: October 6 agenda
45
Product Description Cost
ALF-EXT60IR18G- GEN2
The ALF-EXT60IR-18G extender set HDMI 2.0 IR 4K / UHD video @ 60 Hz with 4:4:4 HDMI 18 Gbps
HDCP 2.2 compliant. 230 feet /
40 meters over single CAT6 cable.Receiver and Transmitter Set $956.25
BIAMP
TesiraFORTÉ AVB CI Fixed I/O DSP with 12 analog inputs, 8 analog outputs, 8 channels configurable
USB audio, 128 x 128 channels
of AVB, and AEC technology (all 12 inputs) $2,987.50
BIAMP TesiraCONNECT TC-5D 5-port expansion device with AVB to Dante Bridging $1,312.50
BIAMP Tesira EX-AEC Tesira 4 channel mic/line input expander with AEC and PoE+ $2,915.00
BZBGear 4-Port USB 3.0 HDBaseT Extender Over Cat6/7 Cable with PoC/RS-232/FSYNC GPIO up to 330ft $1,345.00
NETGEAR 8x1G PoE+ 125W 2x1G and 2xSFP Managed Switch - GSM4212P-100NAS $640.00
SHARP DD-E244F
MultiSync DD-E244F, 23.8" IPS LED Backlit LCD monitor with 3-sided Ultra Narrow Bezels, 1920 X
1080, HDMI 1.4 $226.25
PTZ OPTICS
(3) PT20X-4K-GY-G3 cameras, one (1) PT-SUPERJOY-G1 IP & Serial joystick controller and the
PTZOptics Camera Management
Platform ("CMP") $7,762.50
PTZ OPTICS PTZOptics Move 4K SDI/HDMI/USB/IP PTZ Camera with 20x Optical Zoom (Gray) $2,350.00
STREAMDECK OG 15-Key Control Pad $186.25
WIRE/CABLE System wiring, cables, connector $937.50
MAC STUDIO
Computer for encoding 4X 4K cameras, microphone input, closed captioning stream, and
presenter's PCs into OBS for live broadcasting. Controls YouTube Studio. Adds lower thirds and
titles. Displays agendas and presentations. $2,499.00
STUDIO DISPLAYS
Monitors, speakers, webcam for Mac Studio. Thunderbolt hub for daisy chaining displays and
providing additional ports for input devices. Displays camera angles for switching. $3,198.00
LABOR $24,095.09
TOTAL INSTALLATION Excluding sales tax $51,410.84
LEXI-CLOUD Annual cloud based captioning subscription $500-$3000
Council Chamber AV Upgrades
46
“Continuous Improvement”
City of Isle of Palms, South Carolina
Audio Visual Design and Implementation Services
Request for Proposals (RFP) 2026-08
August 27th, 2026 @ 12:00PM
Response From: Sharp Business Systems
109 Ben Hamby Drive Greenville SC 29615
Brooks Gardner
Brooks.gardner@sharpusa.com
864-361-1612
47
City of Isle of Palms, South Carolina (IOP) requirements and questions are denoted in gray.
Mandatory Requirements:
• Four (4) or more permanently installed 4K pan, tilt, and optical zoom cameras
• Camera coverage of councilmembers, public comment podium, wide room view, and multiple angles
for round-table discussions.
• Professional production capabilities and video switching between camera angles, presentation
content, remote meetings, and meeting start, recess, and adjournment screens.
• System should facilitate remote meeting participants (Zoom/Teams/etc.) to show on the livestream
and display in the council chamber
• Install necessary cabling for all audio/video work that is hidden or minimally visible
• Ability to overlay graphics including lower-thirds, meeting titles, and City branding.
• Provide hands on training of all AV technology installed
• Provide documentation on network setup, passwords and access information, and instructions on how
to use all equipment
Sharp Business Systems of South Carolina (SBS) will comply with these requirements.
Accessibility Requirements:
• Real time closed captions with four (4) seconds or less latency.
• Captions must be viewer-selectable and not permanently burned into the video.
• Caption functionality during YouTube livestreams.
• Vendors shall disclose caption accuracy, hardware/cloud subscription costs, licensing requirements.
• Ability to live stream 4K video quality
SBS will comply with these requirements.
System Architecture Diagram Requirement
Each proposal shall include a detailed system architecture diagram illustrating cameras, audio systems,
video switching, cable connection and feed types, captioning workflow, remote meeting integration,
network connectivity, and YouTube streaming workflows.
Signal flow and system responsibilities shall be clearly identified.
SBS will comply with these requirements. Please see systems architecture diagram in appendix.
Proposal Evaluation Criteria
• Experience in similar installations
• Adherence to best practices to yield a professional, high quality, reliable, and neat AV installation
SBS and predecessor companies have served South Carolina agencies since 1981 and employ ~90 SC
residents.
Sharp Electronics Corporation (SEC) has been in business since 1962, and in November of 2008, SEC
purchased Kearns Business Solutions in Easley, SC and changed its name to Sharp Business Systems
(SBS). At the time of the purchase, the focus of Kearns Business Solutions was document based. With
the introduction to the entire Sharp line and adoption of the Sharp emphasis of documents as well as
AV, SBS of SC attention has also changed to document output devices as well as AV products. SBS
installed solutions encompass private companies as well as public sector and non-profit agencies around
the state.
48
A few SBS ~90 employees:
SBS has been a premier provider of AV solutions in South Carolina since 2009 and a state contract
provider since 2010.
As Sharp is a recognized leader in technology
products and a market leader since the early
1990s, it should be said that SBS sees itself as a
premier provider of these products especially in
interactive whiteboard technology and complex
AV solutions, and related services. SBS has
many employees with relevant certifications and
experience regarding this RFP and uses a few
subcontractors that can fill required areas.
Accordingly, hardware, solution, and
service pricing from SBS will be indicative of a
premier technology manufacturer that takes
ownership of the result.
Business Philosophy
SBS is a direct sales division of Sharp
Electronics Corporation. SBS branches
throughout the U.S. combine the
resources of a multi-billion-dollar
corporation and the value of local
representation with local management
and community relationships. SBS experienced business technology specialists evaluate current
technology environment to help improve a company’s efficiency, security and bottom-line through best-
in-class products, solutions and support.
49
Key Sharp personnel:
• Brandon Bailey – Sharp Electronics Corporation through its Sharp Business Systems
• Division (SBS) AV Contract Point of Contact and Visual Solutions Regional Manager, East
• Ty Olsen – SBS Av Specialist
• John Wardlaw – SBS AV Inventory and Implementation Specialist
• Chris Fouracre – SBS AV Project Manager and Post Sales Specialist
• Curt Von Burg – SBS AV trainer
• Steve Brauner – Sharp Electronics Senior Product Manager, Professional Displays
• Brooks Gardner – SBS RFP Response POC and Government Account Specialist
• Cindy Guest – SBS Customer Support Representative Manager and SC Contracts Administration
Fee Contact
Information about Sharp key personnel:
• Brandon Bailey – experience in AV solutions since early 2000s
• Ty Olsen – AV solutions and inventory control since early 2000s
• John Wardlaw – AV Inventory and Implementation Specialist since 2021
• Chris Fouracre – AV Project Manager and Post Sales Specialist since 2022
• Curt Von Burg – SBS MFP and AV trainer since 2011
• Steve Brauner –As the senior product manager for Sharp professional displays, Mr.
• Brauner will also support Brandon in presales as well as post sales in surveying
• customers to improve Sharp offerings. Steve has worked for Sharp since 2009.
• Brooks Gardner –Brooks has served as government accounts representative responsible
• for RFP responses and adherence to procurement code and contracts since 2009
• Cindy Guest –SBS State contract admin fee administrator since 2018. Employed with
• SBS since 2010.
• References for similar installations
Georgetown County School District
2018 Church St, Georgetown, SC 29440
Linda Crouch
(843) 436-7000
lcrouch@gcsd.k12.sc.us
~600 Sharp boards located in classrooms and conference rooms.
Town of Hilton Head
1 Town Center Ct, Hilton Head Island, SC 29928
Thomas Sunday
(843) 341-4600
ThomasS@hiltonheadislandsc.gov
Sharp AV solutions are installed in conference rooms, boardroom, EOC, training rooms, etc.
Town of Bluffton
20 Bridge St, Bluffton, SC 29910
Tracye Stormer
(843) 706-4500
tstormer@townofbluffton.com
50
Sharp AV solutions are installed in conference rooms, boardroom, EOC, training rooms, etc.
Town of Beaufort
1911 Boundary Street Beaufort, SC 29902
Traci Guldner
843-525-7024
tguldner@cityofbeaufort.org
Sharp AV solutions are installed in conference room/boardroom
Town of Hardeeville
30 Martin Street, Hardeeville, SC 29927
Daniel Rock
843-784-2392
drock@hardeevillesc.gov
Sharp AV solutions are installed in conference room/boardroom
City of Anderson
401 Main Street, SC, 29624
Jason Nixon
864-231-2620
jnixon@CITYOFANDERSONSC.com
Sharp AV solutions are installed in conference room/boardroom
Sample of other South Carolina public bodies for which supplies or services have been provided during
the past three years:
South Carolina State University
South Carolina Arts Commission
South Carolina Regional Housing Authority
Laurens County Airport
Laurens County Detention Center
Laurens County Sheriff’s Office
Laurens County Library
Laurens County Museum
Lexington County
Greenville County
Legacy Early College
City of Spartanburg
Pickens County
Union County School District
City of Clinton
SC DEW
McCormick County School District
Calhoun County
Midlands Workforce
City of Union
Newberry County
51
Kershaw County Board of Disabilities Center for Excellence
High Point Academy
South Carolina Commission for the Blind
City of Greer
City of Travelers Rest
• Timeline for completion of project and proposed downtime
Once award has been made, it is expected that inventory will take a maximum of 3 weeks and physical
installation taking up to 2 weeks. Downtime will be up to 2 weeks but negotiable based on staffing and
needs of The City.
• Cost
Please see detailed pricing located in the appendix.
• On-going support, training and availability for support 24/7
For terms and conditions, please see SBS standard service agreement located in appendix. Business
Hours are Monday-Friday 8:00am to 5:00pm (excluding holidays). SBS has authority to negotiate these
terms with IOP.
Proposal Requirements
• The contractor must provide documentation articulating their qualifications, and how many years of
experience they have in the area of AV design and implementation.
Please see documentation above regarding references, SBS employee qualifications, and solutions
provided. SBS has been providing AV solutions since 2009.
• The Contractor shall provide a detailed pricing breakdown of all designs and installation services.
Please see detailed pricing located in the appendix.
• Warranty
o Labor: Provide a 12-month labor guarantee of all shop and field fabricated components and all QSYS
control functionality. This includes the labor to remove and replace any/all defective audio, power or
video cabling.
SBS will comply with this requirement.
o Materials: Provide a 12-month warranty of all small components i.e. cables, connectors, stands,
custom fabricated products. All other audio, power and video components are covered by each
respective manufacturer’s warranty and subject to their implicit terms.
SBS will comply with this requirement.
o Provide any software maintenance agreements or warranty information
Please see SBS standard service agreement located in appendix.
o Provide information on any manufacturer or third party hardware warranties
All equipment installed by SBS is applicable to standard manufacturer warranties.
• Provide all system passwords and admin access information
52
SBS will comply with this requirement.
Deadline for Questions
The deadline for questions is August 13, 2026. Proposers should send questions regarding this Request
for Proposals to Joshua Uys, Public Information Officer, in writing by email to juys@isleofpalms.gov.
Questions received before this deadline will be answered via addendum posted on the City’s website at
www.isleofpalms.gov/requests-bids-proposals. If an addendum is issued, proposers must acknowledge
receipt of the addendum with their proposal. Questions received after this deadline will not be
answered.
SBS acknowledges any addendums.
By submitting a proposal, proposers attest that they have read the “Agreement” that is included
in this Request for Proposals and are prepared to execute these documents should they be the
successful proposer.
SBS acknowledges any agreement that is included in this RFP.
Proposers acknowledge and agree that the City will not be liable for any costs, expenses, losses,
damages (including damages for loss of anticipated profit) or liabilities incurred by the respondent or
any member of the respondent’s organization as a result of, or arising out of, submitting a proposal,
negotiating changes to such proposal, or due to the City’s acceptance or non-acceptance of the proposal
or the rejection of any and all Proposals. Respondents are responsible for submission of accurate,
adequate and clear descriptions of the information requests. Neither issuance of the RFP, preparation
and submission of a response, nor the subsequent receipt and evaluation of any response by the City of
Isle of Palms will commit the City to award a contract to any respondent even if all the requirements in
the RFP have been met. By signing its proposal, Proposer certifies that it will comply with the applicable
requirements of Title 8, Chapter 14 of the South Carolina Code of Laws and agrees to provide to the City
upon request any documentation required to establish either: (a) that Title 8, Chapter 14 is inapplicable
both to Proposer and its subcontractors or sub-subcontractors; or (b) that Proposer and its
subcontractors or sub-subcontractors are in compliance with Title 8, Chapter 14. Pursuant to Section 8-
14-60, "A person who knowingly makes or files any false, fictitious, or fraudulent document, statement,
or report pursuant to this chapter is guilty of a felony, and, upon conviction, must be fined within the
discretion of the court or imprisoned for not more than five years, or both." Proposer agrees to include
in any contracts with its subcontractors language requiring its subcontractors to (a) comply with the
applicable requirements of Title 8, Chapter 14, and (b) include in their contracts with the sub-
subcontractors language requiring the subcontractors to comply with the applicable requirements of
Title 8, Chapter 14.
SBS agrees to these requirements.
Thomas Pickens, President
If the Proposer is a corporation, state your correct corporate name and State of incorporation. If
Proposer is a partnership, state names and addresses of partners. If Proposer is a trust or other
legal entity, state correct names and addresses of trustees or names and address of those legally
authorized to proposal and enter into contracts.
53
SBS full legal name is Sharp Electronics Corporation through its Sharp Business Systems Division. Sharp
Electronics Corporation is incorporated in New Jersey.
54
Appendix
55
56
USA-SEC-2020-SBS-00019.1
Customer Care Maintenance Agreement
Sharp Business Systems of South Carolina Service / Supplies 800-768-6482
SCHEDULE 1
Description of Installed System:
ALFATRON ALFATRON ALF-EXT60IR18G- GEN2
BIAMP BIAMP 920-00396-00001
BIAMP BIAMP 920-00087-00001
BIAMP BIAMP 920-00308-00001
BZBGEAR BZBGEAR BG-USB3-LR100
NETGEAR NETGEAR GSM4212P100NAS
SHARP SHARP DD-E244F
PTZ OPTICS PTZ OPTICS
PT20X4K-PRODUCER-
SJOY
PTZ OPTICS PTZ OPTICS PT20X4KGYG3
ALMO ROLAND V-160HD
ELGATO ELGATO STREAMDECK
AI-MEDIA AI-MEDIA LEXI-CLOUD
Z-SHARP Z-SHARP WIRE/CABLE
Premises Name & Address
City of Isle of Palms, South Carolina
1207 Palm Boulevard, Isle of Palms, South Carolina 29451
57
USA-SEC-2020-SBS-00019.1
Sharp SBS Annual Service Level Agreement (SLA) - Billed Annually Includes:
Note: Service items must be requested by emailing Sharp-SBS, or by phone at 800-go-sharp.
* Service hours exceeding plan will be charged at current service rates.
** Emergency truck roll rates apply at two times the normal billing rate of current enrolled plan.
*** Email response during business hours.
***Business Hours are Monday-Friday 8:00am to 5:00pm (excluding holidays). No repair
service shall be performed after normal business hours, and Sharp or an authorized
Dealer (“Dealer”) shall not be obligated to render any repair service except during normal
business hours, unless Client first agrees to pay Dealer's then-current hourly rate for
after-hours support.
Description of Coverage SHARP's Standard Limited
Product Warranty
SLA coverage
per year, per unit
Repair or Replacement of Defective Products / Parts at No Charge
for Up to Three Years Following the Purchase Date
Helpdesk Support by Calling: 1-800 BE-Sharp Local Support (864) 675-2000
Helpdesk Support to Address all Service Issues, including the
Handling and Scheduling of Warranty Work by Calling Our Local
Phone Number Directly: 1-864-675-2000
Aquosboard removal, Installation, Configuration of the Shuttle
PC for Servicing (Max Height 6')
Loaner Aquosboard Provided if Customer's Aquosboard must be
Sent Offsite for Repair or Becomes Unusable for more than 48
Hours due to Repairs
Coverage for Reloading Original Software Back to Factory
Defaults
Scheduled annual firmware/software updates & training.
58
USA-SEC-2020-SBS-00019.1
Services and Expenses Not Covered by this Agreement.
Dealer is not responsible for programming any software used or required by
the Systems unless such programming or software is specifically listed on Schedule 1. Software
upgrades, revisions, and installation are not covered under this Agreement, nor is service for
software that becomes corrupted by no intentional act of Dealer.
This Agreement does not cover or apply to, and Dealer will have no Obligation or responsibility to
provide Services for any equipment or components not specifically identified in the description of
the System in Schedule 1, or for any inability to provide Services with respect to any Equipment
or Systems or components thereof damaged due to (i) abuse, (ii) misuse, (iii) loss of electrical
power or power fluctuation, (iv) work performed by non-Dealer personnel, (v) Acts of God.
Dealer will have no obligation or responsibility for services not designated as Services in
Schedule 1 of this Agreement.
Unless otherwise specified in Schedule 1, this Agreement does not cover the repair of the
monitoring appliance, Systems or components of Systems or the replacement of a monitoring
appliance, Systems or components of Systems.
Any excluded services performed by Dealer at Client’s request will be subject to payment of
Dealer’s then-current rates for such services.
Time and Materials (“T&M”) Charge for Additional Service Beyond this Plan. If during the Annual
On-Site Preventative Maintenance visit, the Dealer’s technician discovers or determines that
there are current or potential problems with the covered equipment that require service beyond
the scope of this Plan, Dealer will prepare a written work order requesting Client to authorize all
necessary labor, materials and replacement parts (T&M). The work order will reflect all such
T&M necessary to perform the work based on the discounted hourly labor rate and equipment
discount stated in this Plan.
Standard & Client Care Plan Fee Schedule
Service Price
*Standard Service Rate $175/hour
Standard Design & Engineering Labor Rate $175/hour
Standard Programming Rate $175/hour
**Standard Truck Roll Rate $75
59
USA-SEC-2020-SBS-00019.1
Summary of Service Level Agreement Pricing
Standard Service Level Agreement 3-Years - $11,550 to start at customer acceptance of
installation.
Option to pay in full by check or wire transfer or by payment outline below to billed by credit
card. Credit card will be billed automatically on the due date.
60
Sharp Service Level Agreement
Sharp Business Systems
USA-SEC-2020-SBS-00019
v. 11.23.2020
1) SERVICES
Subject to the provisions of this Agreement, Sharp Electronics Corporation (“Company”
or “Sharp”) will provide remote monitoring, hosting services and additional services
(the “Services”) for Sharp’s Client signing below (“Client”) on-premises electronic
systems (the “Systems”), each as described in Schedule 1 to this Agreement. All such
Services will be rendered in accordance with such policies as may be established by
Company from time to time.
2) MONITORING
Company’s ability to perform certain Services is dependent upon installation and
continued connection at the location in Schedule 1 (“Premises”) of the remote
monitoring appliance (the “Appliance”) described in Schedule 1, which is available for
[purchase/lease] from Company for the price specified on such Schedule. Company’s
ability to perform certain Services is also dependent on Client’s maintenance of a
reliable, timely, electronic connection to the Internet. Accordingly, Client will obtain,
install, operate and maintain, at Client’s expense, all necessary hardware, software, and
telecommunications connections, services and equipment, compatible with and suitable
to allow Company to monitor the Systems via the Internet.
3) PAYMENT
Client will make payment within ten (10) days of invoice being due. Client shall be
liable for all reasonable attorneys' fees as well as costs incurred in collection of past due
balances, including but not limited to collection fees, filing fees and court costs.
4) ACCESS TO PREMISES
To the extent that Services are performed on Premises, Client hereby grants to
Company, access to the Premises and further grants Company a payment-free license to
provide the Services described in any Statement of Work (“SOW”) and use Client’s
facilities necessary therefor within the Premises.
5) WARRANTIES; LIMITATIONS OF LIABILITY
a) Client warrants and represents that it shall not use any systems or processes made
available by Company to Client for any purposes or activities that violate the laws of
any jurisdiction, including the sending of unsolicited, bulk commercial email (i.e.,
SPAM).
b) In no event shall either party be liable for any special, indirect, exemplary, or
consequential damages, or for lost revenue, loss of profits, savings, or other economic
loss arising out of or in connection with this agreement, any SOW(s), or any services
performed or parts supplied hereunder, any loss or interruption of data, technology, or
services, or for any breach hereof or for any damages caused by delay in furnishing
services under this agreement or any SOW(s), even if such party has been advised of the
possibility of such damages.
Company’s aggregate liability to client for damages from any and all causes whatsoever,
and regardless of the form of action, whether in contract, tort, or negligence, shall be
limited to the amount of the client’s actual direct damages not to exceed the amount of
fees paid by client to company for the services during the three (3) months immediately
prior to the date on which the cause of action accrued.
It is understood and agreed that the costs of hardware or software (if any) provided to
client under this agreement shall not be included in the calculation of the limitation of
damages described in the preceding sentence.
c) Company shall not be responsible for failures to provide service if any of the
following issues exist that are unrelated to Company’s actions or inactions: (a) Client
network issues, (b) changes made to the Client network not communicated to the
Company, (c) loss of or limitation to necessary internet connectivity to the Client site for
any reason, or (d) service failures that result from any actions or inactions of the Client
contrary to the Company’s recommendations, (e) if the Systems are relocated without
prior agreement.
6) INDEMNIFICATION
Each party (an “Indemnifying Party”) hereby agrees to indemnify, defend and hold the
other party harmless from and against any and all loss, damage, cost, expense or
liability, including reasonable attorneys' fees, (collectively, “Damages”) that arise from,
or are related to the negligent acts or omissions, breach of the agreement, or intentional
wrongful misconduct of the Indemnifying Party and/or the Indemnifying Party's
employees.
7) COPYRIGHTS AND OTHER INTELLECTUAL PROPERTY
Company owns and retains all intellectual property rights as related to its products
software, including but not limited to all plans, software or software modifications.
Company’s intellectual property rights may not be distributed, transferred or sold in any
form or manner without the express written consent of Company.
8) TERM AND TERMINATION
a) Term. This Agreement shall remain in effect for a period of _________ (__) months
beginning on the effective date of this Agreement. The Client is only permitted to
terminate this Agreement within three (3) days after this Agreement is signed.
b) Renewal: This Agreement shall automatically be renewed for the length of the
original term at then current rates unless either party gives written notice at least thirty
(30) days before the end of the term, not to renew during the term of the Agreement.
c) Default. In the event that one party (a “Defaulting Party”) commits a material breach
of this Agreement (including failure to make a payment) or a SOW, the non-Defaulting
Party shall have the right, but not the obligation, to terminate this Agreement and/or the
relevant SOW provided that (i) the non-Defaulting Party has notified the Defaulting
Party of the specific details of the breach in writing, and (ii) the Defaulting Party has not
cured the default within thirty (30) days following receipt of written notice from the non-
Defaulting Party.
9) CONFIDENTIAL INFORMATION:
With respect to all confidential information which includes all pricing information or
any information related to Sharp’s products, disclosed under this Agreement by a
disclosing party (“Disclosing Party”) to a receiving party (“Receiving Party”)
(“Confidential Information”), the parties hereto agree as follows: (a) the Receiving Party
will not, without the prior written consent of Disclosing Party, disclose the Confidential
Information to any third party, and (b) Receiving Party will take reasonable and
customary precautions to prevent disclosure of such Confidential Information to any
third party.
10) MISCELLANEOUS
a) Amendment. No amendment or modification of this Agreement or any SOW
(including any schedules or exhibits) shall be valid or binding upon the parties unless
such amendment or modification specifically refers to this Agreement, is in writing and
is signed by each party.
b) Time Limitations. The parties mutually agree that any action for breach of or upon a
matter arising out of this Agreement or any SOW must be commenced within one (1)
year after the cause of action accrues or the action is forever barred.
c) Severability. If any provision hereof or any SOW is declared invalid by a court of
competent jurisdiction, such provision shall be ineffective only to the extent of such
invalidity, illegibility or unenforceability so that the remainder of that provision and all
remaining provisions of this Agreement or any SOW shall be valid and enforceable to
the fullest extent permitted by applicable law.
d) Force Majeure. Company shall not be liable to Client for delays or failures to
perform its obligations under this Agreement or any SOW because of circumstances
beyond its reasonable control. Such circumstances include, but shall not be limited to,
any acts or omissions of any governmental authority, natural disaster, act of a public
enemy, acts of terrorism, riot, sabotage, disputes or differences with workmen, power
failure, communications delays/outages, delays in transportation or deliveries of
supplies or materials, acts of God, pandemics/epidemics or any other events beyond the
reasonable control of Company.
e) Insurance. Company and Client shall each maintain, at their own expense, all
insurance reasonably required in connection with this Agreement or any SOW,
including but not limited to, workers compensation and general liability with a limit not
less than $1,000,000 per occurrence. The required insurance coverage shall be issued by
an insurance company duly authorized and licensed with the following minimum
qualifications in accordance with the latest edition of A.M. Best's Insurance Guide:
Financial Stability B+ to A+.
f) Governing Law; Venue. This Agreement and any SOW shall be governed by, and
construed according to, the laws of the State of New Jersey. Client hereby irrevocably
consents to the exclusive jurisdiction and venue of the federal and state courts in Essex
and Bergen Counties, in the State of New Jersey, for any and all claims and causes of
action arising from or related to this Agreement.
g) Waiver of Jury Trial. The parties agree that they waive any right to a trial by jury for
any and all claims and causes of action arising from or related to this Agreement.
h) Subcontractors. Company may subcontract or delegate part or all of the Services to
one or more third parties.
i) Export. Client will comply with applicable import, export control and economic
sanction laws and regulations, including those of the United States, that prohibit or
restrict the export, re-export, or transfer of products, technology, services or data,
directly or indirectly, to certain sanctioned countries and users, and for certain
prohibited end uses, including, but not limited to, nuclear facilities, space or missile
systems, and weapons systems (whether chemical, biological, or otherwise). Client
agrees to comply with all such laws, regulations, orders, and policies.
j) Taxes. Client will pay all taxes (if any) and assessments levied or payable as a result
of ownership, sale, rental, use, or possession of delivered, installed, or repaired
machines, accessories, and supplies.
k) Non-Interference. Client agrees that it will not interfere with or attempt to impair
any business relationship between Company and any third party. Client will not
attempt, either directly or indirectly, to solicit, entice, hire or otherwise induce any
employee of Company to terminate its employee relationship with the Company for
twelve (12) months following the termination or expiration of this Agreement.
61
Sharp Service Level Agreement
Sharp Business Systems
USA-SEC-2020-SBS-00019
v. 11.23.2020
l) Derivative Works: Client shall not (i) modify, copy or create derivative works based
on the software or intellectual property rights provided by Company; (ii) frame or mirror
any content forming part of the software or Services, other than on Client's own
intranets or otherwise for its own internal business purposes; or (iii) reverse engineer the
software.
o) Notices. Where notice is required to be provided to a party under this Agreement,
such notice shall be deemed delivered upon receipt by the receiving party or refusal of
delivery, when deposited in the United States Mail, first class mail, certified or return
receipt requested, postage prepaid, or one (1) day following delivery when sent by
FedEx to the addresses set forth in the opening paragraph of this Agreement, or to such
other address as the parties may designate from time to time.
IN WITNESS WHEREOF, this Agreement is executed by the parties hereto as of the date indicated below.
Sharp Electronics Corporation Client
By:
By:
Date:
Date:
62
VENDOR MANUF PRODUCT DESCRIPTION QTY MSRP UNIT PRICE EXT PRICE REP OUTCOST
ALFATRON ALFATRON ALF-EXT60IR18G- GEN2
The ALF-EXT60IR-18G extender set HDMI 2.0 IR 4K / UHD video @ 60 Hz with 4:4:4 HDMI 18 Gbps HDCP 2.2 compliant. 230 feet /
40 meters over single CAT6 cable.Receiver and Transmitter Set 5 $278.00 219.00$ 1,095.00$ 956.25$
BIAMP BIAMP 920-00395-00001
TesiraFORTÉ AVB CI Fixed I/O DSP with 12 analog inputs, 8 analog outputs, 8 channels configurable USB audio, 128 x 128 channels
of AVB, and AEC technology (all 12 inputs) 1 $4,780.00 3,415.00$ 3,415.00$ 2,987.50$
BIAMP BIAMP 920-00087-00001 TesiraCONNECT TC-5D 5-port expansion device with AVB to Dante Bridging 1 $2,100.00 1,500.00$ 1,500.00$ 1,312.50$
BIAMP BIAMP 920-00308-00001 Tesira EX-AEC Tesira 4 channel mic/line input expander with AEC and PoE+ 2 $2,332.00 1,666.00$ 3,332.00$ 2,915.00$
BZBGEAR BZBGEAR BG-USB3-LR100 4-Port USB 3.0 HDBaseT Extender Over Cat6/7 Cable with PoC/RS-232/FSYNC GPIO up to 330ft 4 $449.00 385.00$ 1,540.00$ 1,345.00$
NETGEAR NETGEAR GSM4212P100NAS 8x1G PoE+ 125W 2x1G and 2xSFP Managed Switch - GSM4212P-100NAS 1 $890.00 683.00$ 683.00$ 640.00$
SHARP SHARP DD-E244F MultiSync DD-E244F, 23.8" IPS LED Backlit LCD monitor with 3-sided Ultra Narrow Bezels, 1920 X 1080, HDMI 1.4 1 $417.00 259.00$ 259.00$ 226.25$
PTZ OPTICS PTZ OPTICS PT20X4K-PRODUCER-SJOY
(3) PT20X-4K-GY-G3 cameras, one (1) PT-SUPERJOY-G1 IP & Serial joystick controller and the PTZOptics Camera Management
Platform ("CMP") 1 $9,181.00 7,762.00$ 7,762.00$ 7,762.50$
PTZ OPTICS PTZ OPTICS PT20X4KGYG3 PTZOptics Move 4K SDI/HDMI/USB/IP PTZ Camera with 20x Optical Zoom (Gray) 1 $2,589.00 2,349.00$ 2,349.00$ 2,350.00$
ELGATO ELGATO STREAMDECK OG 15-Key Control Pad 1 $149.00 149.00$ 149.00$ 186.25$
AI-MEDIA AI-MEDIA LEXI-CLOUD cost per usage or subscription based CC (annual cost between $500-$3000 depending on amount of usage) 0 36.00$ - $ - $
Z-SHARP Z-SHARP WIRE/CABLE SYSTEM WIRING, CABLES, CONNECTORS 1 1,072.00$ 1,072.00$ 937.50$
TOTAL PARTS (APPLICABLE SALES TAX WILL APPLY) 23,156.00$ 23,156.00$ 21,618.75$
TOTAL LABOR (NON-TAX) 25,836.00$ 25,836.00$ 24,095.09$
GRAND TOTAL 48,992.00$ 48,992.00$ 45,713.84$
3 YEAR ON SITE SERVICE (APPLICABLE SALES TAX WILL APPLY) 10,290.00$ 10,290.00$
63
64
65
10AM, September 25, 2026 Budgetted:$500,000.00
Vendor Base Bid Alternate 1 Alternate 2Total
Whitestone Construction $296,000.00$35,000.00$34,000.00 $365,000.00
Icon Contracting $488,431.00$14,819.00$18,930.00 $522,180.00
Truluck Construction, Inc $618,069.00$51,450.00$34,195.00 $703,714.00
IPW Construction Group, LLC $744,513.00$60,000.00$30,000.00 $834,513.00
The Bastion Group LLC $1,127,050.00$25,500.00$39,500.00$1,192,050.00
RFB 2026-07
Marina Parking Lot Improvements
66
1
Douglas Kerr
From: Douglas Kerr
Sent: Tuesday, September 29, 2026 8:59 AM
To: 'Clarkson Jones'; 'Matthew Cline'; Sean Kuester
Subject: RE: concrete items for IOP Master plan
Here is a list of topics we would like to discuss:
1. Your quesƟons below, that we did not answer
2. Talk through issues that may not have been clear in the plans (example- there is a dumpster enclosure
in a drive aisle that needs to be demolished)
3. We need to add a dumpster enclosure in a spot where the ditch used to be- final locaƟon working out
now
4. Bidders had quesƟons about items that should have been included and items that should not (wall
blocking headlights, monument signage, transformer pad, access gate, etc). They claim to have
included those in their bids and we wanted to understand how you bid.
5.We have a power pole that Dominion is moving and we will need a new service wire run from that pole
locaƟon (being staked out today maybe) and our exisƟng electrical meter out by the dock. We would
like to see if your electrician could add this work and if so what the cost will be.
6. We would like to add an asphalt bike path to connect the new Waterway Blvd. mulƟuse path and the
public dock (see blue line on below and we want to discuss cost to add this- the could be whatever
width that works for the equipment you would have on site, but ideally 5’ish. Length appears to be
about 640’.
67
2
68
3
Thanks, Douglas
Douglas Kerr
City Administrator
City of Isle of Palms
P.O. Drawer 508
Isle of Palms, SC 29451
(p) 843-886-6428
(c) 843-666-9326
(f) 843-886-8005
To submit service requests or sign up for city text alerts:
Text “Hello” to (877) 607-6467
Connect with IOP!
*** WARNING *** All e-mail correspondence to and from this address may be subject to public disclosure
under the South Carolina Freedom of Information Act (FOIA).
From: Douglas Kerr
Sent: Tuesday, September 29, 2026 8:40 AM
To: Clarkson Jones <cjones@wschs.com>; Matthew Cline <matt@clineeng.com>; Sean Kuester
<SKuester@isleofpalms.gov>
Subject: RE: concrete items for IOP Master plan
Clarkson- could we have a call someƟme today or tomorrow to talk through your bid and the quesƟons you
asked and we failed to answer?
Thanks, Douglas
Douglas Kerr
City Administrator
City of Isle of Palms
P.O. Drawer 508
Isle of Palms, SC 29451
(p) 843-886-6428
(c) 843-666-9326
(f) 843-886-8005
To submit service requests or sign up for city text alerts:
Text “Hello” to (877) 607-6467
Connect with IOP!
*** WARNING *** All e-mail correspondence to and from this address may be subject to public disclosure
under the South Carolina Freedom of Information Act (FOIA).
69
4
From: Clarkson Jones <cjones@wschs.com>
Sent: Friday, September 18, 2026 3:17 PM
To: Douglas Kerr <dkerr@isleofpalms.gov>
Subject: concrete items for IOP Master plan
Mr. Kerr,
Is there any concrete sidewalks and ADA concrete on the planset ? We see it in the contract bid docs, but
nothing called out by Cline other than on the front page?
Thanks !
Clarkson Jones
Whitestone Construction
5841 Rivers Ave Suite 101
North Charleston, SC 29406
C: 704-491-6222
cjones@wschs.com
www.wscjax.com
70
CITY OF ISLE OF PALMS, SOUTH CAROLINA
REQUEST FOR BIDS (RFB) 2026-07
ISLE OF PALMS MARINA PARKING LOT IMPROVEMENTS
The City of Isle of Palms is seeking bids from qualified contractors to redevelop and
modify the parking lot and driveways at the Isle of Palms Marina site, 50 41st Avenue.
The work includes demolition and asphalt milling, grading and drainage improvements,
asphalt pavement and asphalt-millings parking areas, ADA parking and access
improvements, concrete work, curbing, gates, fencing, signage, pavement markings,
erosion control, and related site improvements shown in the attached plans prepared by
Cline Engineering and dated August 24, 2026.
Because the site is an operational restaurant, time is of the essence and the timeframe
to get work completed is important. The chosen contractor will have the time between
January 1, 2027 and February 28, 2027 to complete all of the work associated with this
project.
A Bid Form is included in this RFB package. Bidders shall review the complete RFB, the
attached plans, all notes and details, existing site conditions, and any addenda, and
shall include in the Base Bid all costs necessary to complete the work except items
specifically identified as Bid Alternates. The successful contractor will be responsible for
completing the accepted work for the lump-sum Base Bid and any alternates accepted
by the City, subject only to written change orders approved in accordance with the
contract.
This request is being made and awarded pursuant to the City's procurement ordinance.
The City reserves the right to reject any and all bids and to waive irregularities.
Bids should be submitted to the following:
Douglas Kerr
City Administrator
City of Isle of Palms
1207 Palm Boulevard
Post Office Box 508
Isle of Palms, South Carolina 29451
Deadline for Questions
The deadline for questions is 5:00 p.m., Eastern Time, September 18, 2026. Bidders
should send questions regarding this Request for Bids to Douglas Kerr in writing or by
email to dkerr@isleofpalms.gov. Questions received before this deadline will be
71
answered by addendum posted on the City's website at http://www.iop.net/requests-for-
bids-proposals. Questions received after this deadline will not be answered.
If an addendum is issued, Bidders must acknowledge receipt of the addendum with their
bid.
Deadline for Submissions
The deadline for submission and public bid opening is 10:00 a.m., local time,
September 25, 2026. Bids will be received at City Hall, 1207 Palm Boulevard, Isle of
Palms, South Carolina 29451, in a sealed envelope and will be publicly opened at 10:00
a.m. in City Hall. Sealed envelopes must be clearly marked "RFB 2026-07 - Isle of
Palms Marina Parking Lot Improvements" and include one (1) hard copy and one (1)
electronic copy saved to a USB flash drive. It will be the responsibility of the bidders to
verify receipt by the City.
Bids may be delivered by hand or by mail, but no bid shall be considered which is not
actually received by the City at the place, date and time appointed by the City and the
City shall not be responsible for any failure, misdirection, delay or error resulting from
the selection by any bidder of any particular means of delivery.
Proprietary and/or Confidential Information: Your bid is a public document under the
South Carolina Freedom of Information Act (FOIA), except as to information that may be
treated as confidential as an exception to disclosure under the FOIA. If you cannot
agree to this standard, please do not submit your bid. All information that is to be
treated as confidential and/or proprietary must be CLEARLY identified, and each page
containing confidential and/or proprietary information, in whole or in part, must be
stamped and/or denoted as CONFIDENTIAL, in bold, in a font of at least 12-point type,
in the upper right-hand corner of the page. All information not so denoted and identified
will be subject to disclosure by the City.
Bidders acknowledge and agree that the City will not be liable for any costs, expenses,
losses, damages (including damages for loss of anticipated profit) or liabilities incurred
by the respondent or any member of the respondent’s organization as a result of, or
arising out of, submitting a bid, negotiating changes, or due to the City’s acceptance or
non-acceptance of the bid or the rejection of any and all bids. Bidders are responsible
for submission of accurate, adequate and clear descriptions of the information requests.
Neither issuance of the RFB, preparation and submission of a response, nor the
subsequent receipt and evaluation of any response by the City of Isle of Palms will
commit the City to award a contract to any respondent even if all the requirements in the
RFB have been met.
Bidders must have or be able to procure an Isle of Palms Business License.
72
Contractors considering submission under this RFB will be expected to have read and
be prepared to enter into the attached contract, which is a part of this RFB. The City of
Isle of Palms reserves the right to accept or reject any and all bids, or any parts thereof;
to waive irregularities or informalities in any bid received to allow the bid to be
considered; to negotiate terms and conditions with Bidders; and to select a Bidder or to
cancel in whole or in part this RFB, if it is in the best interest of the City to do so. Bids
determined not to be in compliance with the provisions of this RFB and applicable laws
and/or regulations will not be processed.
By signing its bid, Bidder certifies that it will comply with the applicable requirements of
Title 8, Chapter 14 of the South Carolina Code of Laws and agrees to provide the City
upon request any documentation required to establish either: (a) that Title 8, Chapter 14
is inapplicable both to Bidder and its subcontractors or sub-subcontractors; or (b) that
Bidder and its subcontractors or sub-subcontractors are in compliance with Title 8,
Chapter 14. Pursuant to Section 8-14-60, “A person who knowingly makes or files any
false, fictitious, or fraudulent document, statement, or report pursuant to this chapter is
guilty of a felony and, upon conviction, must be fined within the discretion of the court or
imprisoned for not more than five years, or both.” Bidder agrees to include in any
contracts with its subcontractors language requiring its subcontractors to (a) comply
with the applicable requirements of Title 8, Chapter 14 and (b) include in their contracts
with subcontractors, language requiring the sub-subcontractors to comply with the
applicable requirements of Title 8, Chapter 14.
Scope of Work
A site visit to the project site at 50 41st Avenue is encouraged.
The Scope of Work for the project includes, but is not limited to, the following:
• Perform the complete redevelopment of the existing parking lot and driveways at
the Isle of Palms Marina, 50 41st Avenue, in accordance with the attached Cline
Engineering plans titled "IOP Master Plan," Job No. 22047, dated August 24,
2026, including all notes, details, and specifications.
• Provide mobilization, survey and layout, utility locating, protection of existing
facilities, site safety, temporary access, traffic control, and maintenance of an
ADA-compliant public route throughout construction.
• The topographic surveys included in the plans show conditions prior to the ditch
on the western edge of the property being piped and filled. To achieve the proper
elevations in this area, material will have to be shifted and it is possible that some
material will have to be removed. The city is willing to accept up to 100 cubic
yards of material at the Public Works site.
73
• Install and maintain the construction entrance, silt fence, inlet protection, and all
temporary and permanent erosion and sediment-control measures; stabilize and
restore all disturbed areas.
• Sawcut and mill existing asphalt and remove and legally dispose of pavement,
curbing, fencing, signage, vegetation, debris, and other items shown to be
removed or affected by the work.
• Perform excavation, subgrade preparation, proof-rolling, undercutting as
required, fill placement, compaction, grading, and fine grading to the lines,
grades, slopes, and elevations shown on the plans.
• Construct the proposed asphalt drive aisles, paved ADA parking areas,
pavement transitions, and tie-ins in accordance with the pavement sections and
details.
• Construct the proposed asphalt-millings parking areas with 3” thick of millings
and all associated base and subgrade preparation.
• Construct concrete sidewalks, thickened pavement edges, parking islands, and
other concrete improvements shown on the plans.
• Layout and stripe parking spaces, ADA spaces and access aisles, directional
arrows, fire lanes, and other pavement markings, and install ADA, Do Not Enter,
Islander 71, and other required signage.
• Modify the existing catch basin to a grate inlet, install permanent FlexStorm
woven inlet filter bags at the locations shown, and complete all related grading
and drainage work.
• Protect and coordinate with existing utilities and structures, and adjust or relocate
facilities only where required by the plans and field conditions. No new utility
improvements are proposed.
• Provide separate prices for:
o Bid Alternate No. 1 - installation of a Barracuda water quality unit to
replace the existing drainage box and tie into the existing system.
o Bid Alternate No. 2 - installation of 8-inch-high by 12-inch-wide ribbon curb
at the locations identified on the plans. Please note that this ribbon curb
will be flush with proposed grade and the 8” is intended to contain the
pavement base adjacent to the improvement.
• Provide all labor, materials, equipment, supervision, permits, licenses, testing
coordination, freight, taxes, disposal, cleanup, closeout documentation, and other
incidentals necessary for a complete and accepted project.
The chosen contractor shall provide all materials, equipment, supplies, freight, state
sales tax, labor, supervision, permits, disposal, testing coordination, and incidentals
necessary to complete the work.
Time is of the essence for this project, and all work associated with this RFB must be
substantially completed within forty-five (45) calendar days from the date established in
the Notice to Proceed.
74
Bid Format
In responding to this request, contractors shall provide a lump-sum Base Bid and
separate prices for each Bid Alternate on the attached "BID FORM."
If any addendum is issued, the contractor must acknowledge receipt by listing each
addendum on the BID FORM.
In addition to submitting the completed BID FORM, contractors submitting bids should
provide examples of experience with similar projects. Provide a brief description of
similar projects of comparable size and complexity for which the Bidder provided
construction services within the past five (5) years. Limit information to no more than
five (5) projects.
All such descriptions should include:
1. Project location.
2. Description of work performed.
3. Description of original project budget versus actual cost.
4. Name and contact information for a reference with knowledge of the Bidder’s
work on the specified project.
Provide the name of the Contractor and, if possible, the names and bids of all
subcontractors that will be part of the Bidder's Team, and identify the specific work each
subcontractor will perform. Once the City issues a contract, no change in subcontractors
assigned to the project will be permitted without prior written approval from the City.
Evaluation Criteria
The City will evaluate bids based on the factors outlined within this RFB and the City’s
procurement ordinance, which shall be applied to all eligible, responsive bids in
selecting the successful contractor. The City reserves the right to disqualify any bid from
a bidder it deems as non-responsive and/or non-responsible. The City reserves the right
to make such investigations of the Bidders as it deems appropriate.
Award of any contract may be made without discussion with Bidders after bids are
received. The City reserves the right to cease contract negotiations if it is determined
that the Bidder cannot perform the services specified in their response.
Recommendation of award for contract will be made based not only on price, which is
an important factor, but also on quality of bid, qualifications, experience, technical
expertise, references and ability to execute the work. After careful evaluation, the Public
75
Facilities Committee may make a recommendation to City Council for award of a
contract or City Council will decide to award a contract without a recommendation.
76
BID FORM
BID OF:_______________________________________________________________
(Contractor)
BID TO: The City of Isle of Palms
PROJECT NAME: Isle of Palms Marina Parking Lot Improvements
PROJECT NUMBER: RFB 2026-07
BID DATE: _______________________________
BASE BID AGREEMENT
The undersigned, having examined all the Bidding Documents, including all Addenda,
shall execute the entire Work in the Bidding Documents described as the Base Bid for
the lump sum of:
_____________________________________________________________________
Dollars
($____________________________) which sum is hereafter called the BASE BID.
BID ALTERNATES
ALTERNATE NO. 1 - Barracuda water quality unit: Add to Base Bid
________________________________ Dollars ($________________).
ALTERNATE NO. 2 - 8-inch x 12-inch ribbon curb: Add to Base Bid
________________________________ Dollars ($________________).
\
77
DATE FOR COMMENCEMENT AND SUBSTANTIAL COMPLETION
The Date for Commencement shall be established in the Notice to Proceed. The
Contractor shall not incur any expense until the contract has been awarded. An award
requires that either the Contract be signed by both the awarding authority and the
contractor or a Notice to Proceed is executed.
All work for the Project shall be substantially completed (as evidenced by the date on
the CERTIFICATE OF SUBSTANTIAL COMPLETION) within 90 (90) calendar days
from the date set forth in the NOTICE TO PROCEED, subject to adjustments as
provided in the Contract Documents.
Final completion of all work shall be performed within the period between January 1,
2027 and February 28, 2027: FIFTY-NINE (59) calendar days from the scheduled
contract time for substantial completion, subject to adjustments as provided in the
Contract Documents.
The undersigned further agrees that from the compensation to be paid, the owner may
retain as liquidated damages the sum of three thousand dollars ($3,000) for each
calendar day the actual contract time for Substantial Completion for the project exceeds
the specified or adjusted contract time for Substantial Completion as provided in the
Contract Documents.
78
THIS AGREEMENT IS SUBJECT TO BINDING ARBITRATION PURSUANT TO
SOUTH CAROLINA CODE SECTION 15-48-10, ET SEQ., AS AMENDED
STATE OF SOUTH CAROLINA ) Marina Parking Lot Improvements
)
COUNTY OF CHARLESTON )
THIS AGREEMENT ("Agreement") is made and entered into this ____ day of
__________, 2026, by and between the City of Isle of Palms, S.C., a South Carolina
municipal corporation ("City"), and ______________________________ ("Contractor").
WHEREAS, Contractor was the successful bidder under the City's RFB 2026-07
for the Isle of Palms Marina Parking Lot Improvements; and
WHEREAS, the parties hereto desire to enter into this Agreement to set forth the
exact rights, duties and obligations of each party regarding the services to be performed
by Contractor pursuant to the bid.
THEREFORE, in consideration of the mutual covenants and promises set forth
herein,
City and Contractor agree as follows:
1. SCOPE OF WORK.
A. Contractor agrees to provide all labor, equipment, tools, materials,
supplies, and incidentals necessary to complete the Isle of Palms Marina Parking Lot
Improvements in accordance with RFB 2026-07, the attached plans, all addenda, and
the bid submitted by Contractor to City dated ______________________ (the "Bid"), a
copy of which is attached hereto as "Exhibit I" and made a part of this Agreement by
reference. In the event of any conflict between the provisions of this Agreement and the
Solicitation, the terms of this Agreement shall control.
B. Contractor agrees to use its best skill and attention and be solely
responsible for all means, methods, techniques, sequences, and procedures in the
performance of the work on the Project. Contractor hereby warrants to City that all work
on the Project shall be performed in a good and workmanlike manner. Contractor
agrees to comply with all applicable federal, state and local laws, rules and regulations
regarding all work performed by Contractor pursuant to this Agreement.
2. CONTRACT PRICE. For all work under this Agreement, including any Bid
Alternates accepted by the City, City agrees to pay Contractor the sum of
79
_______________________________ ($______________) Dollars, payable in
accordance with the Contract Documents.
3. CHANGE ORDERS. The City has the right to require alterations or changes
(“Change Orders”) to the Project and in such case Contractor agrees to make such
alterations or changes; provided, however, that the details and additional cost or credit
of such Change Order must be agreed to by the City and Contractor in writing prior to
the commencement of the Change Order.
4. COMPLETION SCHEDULE. TIME IS OF THE ESSENCE. Contractor agrees to
substantially complete the Project within sixty (60) calendar days from the date set forth
in the Notice to Proceed. Provided, however, that if performance by Contractor is
delayed for reasons or causes beyond Contractor's control (including, but not limited to,
acts of God, weather conditions, unforeseen site conditions, labor or material shortages,
delays caused by City, and casualty losses), the Project completion date shall be
extended as provided in the Contract Documents.
5. INSURANCE. Contractor agrees to maintain comprehensive general liability
insurance coverage on the work under the Project in an amount not less than
$1,000,000.00 per person, $2,000,000.00 per claim, and $250,000.00 per claim for
property damage. Contractor also agrees to maintain worker’s compensation coverage
on its employees as required by the State of South Carolina workers’ compensation
laws. All insurance coverage required hereunder shall be with companies approved in
advance by City, who shall be named as an additional insured on all such policies.
Proof of such insurance shall be provided to City prior to commencement of any work by
Contractor.
6. PERMITS, FEES AND LICENSES. Contractor agrees to apply for, obtain and
pay for all permits, fees, licenses and inspections by governmental agencies necessary
for the Contractor’s proper performance and completion of the Project, including, but not
limited to, a City business license.
7. INDEMNIFICATION. Contractor agrees to hold harmless and indemnify City and
its officers, agents and employees from and against any loss or damage, including all
reasonable attorney’s fees and expenses, incurred as a result of any and all claims,
demands, causes of action, suits, judgments, fines or penalties (including but not limited
to all fees and expenses incurred as a result of death or injury to persons or for loss of
or damage to property) arising out of or in connection with Contractor’s performance of
the work under this Agreement.
8. SITE INVESTIGATION. Contractor acknowledges that Contractor has inspected
the service areas, has determined the nature of the work and the difficulties and
80
facilities attending performance of the work, and all other matters which Contractor
contemplates may in any way affect the work under this Agreement.
9. BINDING ARBITRATION. Any dispute or controversy arising under or in
connection with this Agreement shall be submitted to binding arbitration in accordance
with the requirements of the South Carolina Uniform Arbitration Act as then in effect
(“SCUAA”). All arbitration proceedings shall be conducted in Charleston County, South
Carolina. The arbitrators shall be selected as provided in the SCUAA, and the
arbitrators shall render a decision on any dispute within ninety (90) days after the last of
the arbitrators has been selected. If any party to this Agreement fails to select an
arbitrator with regard to any dispute submitted to Arbitration under this Section within
thirty (30) days after receiving notice of the submission to arbitration of such dispute,
then the other party or parties shall select an arbitrator for such nonselecting party, and
the decision of the arbitrators shall be final and binding upon all the parties to the
dispute, their personal representatives, legal representatives, heirs, successors and
assigns. The prevailing party in any such proceeding shall be entitled to reimbursement
by the losing party, in addition to any damages awarded, for all reasonable costs and
expenses, including attorney’s fees, incurred in any such proceeding, including all trial
and appellate levels. Nothing contained in this Section shall preclude either party from
seeking injunctive relief through a court of competent jurisdiction in connection with the
Arbitration, and the prevailing party shall also be entitled to reimbursement by the losing
party for all reasonable fees and costs, including attorney’s fees, incurred in the
proceedings seeking injunctive relief.
10. BREACH.
A. In the event that either party breaches any provision of this Agreement,
and the same continues for a period of seven (7) days after receipt of written notice
thereof, then the nonbreaching party may exercise any and all remedies at law or in
equity regarding the breach of this Agreement. Without prejudice to any other rights or
remedies available for the said breach, the non-breaching party may terminate this
Agreement and cease further performance under this Agreement.
B. Unless authorized by this Agreement, if the Contractor completely ceases
work on the Project for a period of fifteen (15) days, or defaults or persistently fails or
neglects to carry out the Project, the City may, after seven (7) days’ written notice to the
Contractor, complete the
Project and if the unpaid balance of the contract price exceeds the City’s actual cost of
completing the Project, such excess shall be paid to the Contractor, but if such expense
exceeds the unpaid balance, the Contractor shall pay the difference to the City.
11. EFFECT OF WAIVER OR CONSENT. A waiver or consent, express or implied,
to or of any breach or default by a party in the performance of its obligations under this
81
Agreement is not a consent or waiver to or of any other breach or default in the
performance by that party of the same or any other obligations of that party with respect
to this Agreement. Failure on the part of a party to complain of any act of the other party
or to declare a party in default with respect to this Agreement, irrespective of how long
that failure continues, does not constitute a waiver by that party of its rights with respect
to that default until the applicable statute-of-limitation period has run.
12. SUB-CONTRACT OR ASSIGNMENT. Contractor agrees not to enter into any
subcontracts or assignments pertaining to the performance of all or any part of this
Agreement, either voluntarily or by operation of law, without prior written approval of
City.
13. BINDING AGREEMENT. This Agreement shall be binding upon and inure to the
benefit of the parties hereto and their respective successors and permitted assigns.
14. GOVERNING LAW; SEVERABILITY. This Agreement is governed by and shall
be construed and interpreted in accordance with the laws of the State of South Carolina.
If any provision of this Agreement is held invalid or unenforceable to any extent by a
court of competent jurisdiction, the remainder of this Agreement is not affected thereby
and that provision shall be enforced to the greatest extent permitted by law.
15. ENTIRE AGREEMENT. This Agreement constitutes the entire agreement
between the parties hereto relating to the subject matter hereof, and supersedes and
nullifies all prior or contemporaneous contracts, agreements, understandings or
representations, whether oral or written, which are not expressly stated in this
agreement. Neither party is relying upon any representation not expressly contained
herein. This Agreement may be amended and modified from time to time only upon the
written mutual consent of City and Contractor.
16. SECTION HEADINGS. The headings of Sections or paragraphs used in this
Agreement have been inserted for convenience only and are not to be used in
determining the contents contained herein.
82
IN WITNESS WHEREOF, the City and Contractor have hereunto set their hands and
seals, by and through the undersigned officers, as of the day and year first above
written.
WITNESS: Contractor:
_______________________________
(#1 as to Contractor)
By: _______________________________
_______________________________
(#2 as to Contractor) Title: ______________________________
The City of Isle of Palms, S.C.:
_______________________________
(#1 as to City)
By: ________________________________
_______________________________
(#2 as to City) Title: _______________________________
83
PLOT DATE: 8/25/2026 1:08:59 PM FILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0027
C L I N EE N G I N E E R I N G
THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING.
REV. DATE DRAWN APPV.DESCRIPTION
SHEET NUMBER
PROJECT MANAGER
DRAWN BY
PROJECT DATE
JOB NUMBER
PROFESSIONAL DESIGN CONSULTING
80 41ST AVENUE
ISLE OF PALMS, SOUTH CAROLINA
IOP MASTER PLAN
22047
AUGUST 2022
AJ/JR
MDC
A 07/29/2026 ISSUED FOR REVIEW AND APPROVAL -- MDC
B 08/24/2026 ISSUED FOR REVIEW AND APPROVAL -- MDC
G-1
COVER
site development plans
for
80 41ST AVENUE
ISLE OF PALMS, south carolina
IOP MASTER PLAN
VICINITY MAPSCALE 1" = 1000'
PROJECT
LOCATION
ADA COMPLIANCETHE PUBLIC RIGHT-OF-WAY MUST REMAIN ADA COMPLIANT DURING
CONSTRUCTION OR AN ALTERNATIVE ROUTE MUST BE PROVIDED. IT
IS THE OWNERS RESPONSIBILITY TO REPAIR ALL DAMAGED
SIDEWALKS TO REINSTATE AN ADA ACCESSIBLE ROUTE.
PROJECT DESCRIPTIONSITE IMPROVEMENTS WILL CONSIST OF THE REDEVELOPMENT OF
PARKING LOT AND DRIVEWAYS.
SITE CONTACTS CLIENTCIVIL ENGINEER
MATTHEW CLINE, P.E.
CLINE ENGINEERING
P.O. BOX 21204
CHARLESTON, SC 29413
PHONE (843) 991-7239
PROJECT SURVEYOR
CITY OF ISLE OF PALMS
DOUGLAS KERR
PO DRAWER 508
ISLE OF PALMS, SC 29451
PHONE (843) 886-6428
SOUTH CAROLINA EROSION CONTROL
S.C.D.E.S. B.C.M.
STORMWATER DIVISION
1362 MCMILLAN AVE. SUITE 400
CHARLESTON, SC 29405
PHONE (843) 953-0200
SOUTH CAROLINA DEPARTMENT OF
TRANSPORTATION DISTRICT 6
6355 FAIN BLVD.
NORTH CHARLESTON, SC 29406
PHONE (843) 740-1667
SHEET LIST TABLESHEET NUMBERSHEET TITLE
G-1 COVER
G-2 GENERAL NOTES
G-3 GENERAL NOTES
V-1 SITE CONDITIONS
C-1 SITE PLAN
C-2 DEMOLITION AND SWPPP
C-3 GRADING AND DRAINAGE PLAN
C-4 UTILITY PLAN
C-5 CONSTRUCTION DETAILS
C-6 CONSTRUCTION DETAILS
C-7 CONSTRUCTION DETAILS
84
PLOT DATE: 8/25/2026 1:09:06 PM FILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0028
C L I N EE N G I N E E R I N G
THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING.
REV. DATE DRAWN APPV.DESCRIPTION
SHEET NUMBER
PROJECT MANAGER
DRAWN BY
PROJECT DATE
JOB NUMBER
PROFESSIONAL DESIGN CONSULTING
80 41ST AVENUE
ISLE OF PALMS, SOUTH CAROLINA
IOP MASTER PLAN
22047
AUGUST 2022
AJ/JR
MDC
A 07/29/2026 ISSUED FOR REVIEW AND APPROVAL -- MDC
B 08/24/2026 ISSUED FOR REVIEW AND APPROVAL -- MDC
G-2
GENERAL NOTES
SITEWORK1. TOPOGRAPHIC AND BOUNDARY SURVEY BY OTHERS AND PROVIDED TO CLINE ENGINEERING BY CLIENT.
2. THE CONTRACTOR SHALL VERIFY THE LOCATION AND INVERT ELEVATION OF ALL UNDERGROUND UTILITIES, AND VERIFY PROPERTY CORNERS AND
TOPOGRAPHY BEFORE ANY CONSTRUCTION IS BEGUN. CALL UTILITY COMPANIES BEFORE EXCAVATION TO LOCATE ALL BURIED CABLES AND UNDERGROUND
UTILITIES. PRIOR TO INSTALLATION OF STORM OR SANITARY SEWER, THE CONTRACTOR SHALL VERIFY THE INVERTS OF EXISTING STRUCTURES AND INFORM
THE OWNER AND THE ENGINEER OF ANY CONFLICTS PRIOR TO CONSTRUCTION.
3. THE CONTRACTOR SHOULD NOTIFY THE ENGINEERS FOR A REVIEW SHOULD DISCREPANCIES BE DISCOVERED AT THE SITE OR ON THE DRAWINGS BEFORE
AND DURING CONSTRUCTION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE BETWEEN ALL CIVIL DRAWINGS WITH GRADING AND UTILITY
CONTRACTORS IN ORDER TO AVOID PROBLEMS DURING CONSTRUCTION.
4. CONTRACTOR TO SCHEDULE A PRECONSTRUCTION MEETING WITH ALL UTILITY COMPANIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE
ENGINEER AND UTILITY COMPANIES DURING CONSTRUCTION OF WATER AND SEWER SO PERIODIC OBSERVATIONS CAN BE MADE. CONTRACTOR WILL
CERTIFY TO THE ENGINEER IN WRITING THAT WATER AND SEWER LINES HAVE BEEN TESTED AND CONSTRUCTED ACCORDING TO THE ENGINEER'S AND
UTILITY COMPANY'S DRAWINGS AND SPECIFICATIONS.
5. EXISTING DRAINAGE STRUCTURES TO BE INSPECTED AND REPAIRED AS NEEDED AND EXISTING PIPES TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS.
6. ALL REFERENCE TO SPECIFICATIONS FOR HIGHWAY CONSTRUCTION OR MATERIALS ARE MADE FROM SOUTH CAROLINA STATE HIGHWAY DEPARTMENT'S
STANDARD SPECIFICATION, LATEST EDITION.
7. ALL DIMENSIONS SHOWN ARE MEASURED FROM OUTSIDE FACE OF BUILDING WALL AND TO FACE OF CURB LINE. MIDDLE LINE IS THE FACE OF CURB.
8. EARTHWORK SHALL BE TO THE LINES AND GRADES SHOWN. PROOF ROLLING AND COMPACTION TEST SHALL BE ACCOMPLISHED IN THE FIELD TO TEST ALL
AREAS. THE OWNER SHALL RETAIN THE SERVICES OF A TESTING COMPANY TO TEST ALL AREAS. MASS AREAS OF FILL SHALL BE PLACED IN LOOSELY
MEASURED LIFTS NOT EXCEEDING 8" THICKNESS. ISOLATED AREAS OF FILL (SUCH AS TRENCH BACKFILL) SHALL BE PLACED IN LIFTS NOT EXCEEDING 6"
THICKNESS.
9. CONTRACTOR SHALL PROTECT ALL TREES THAT ARE TO REMAIN AS MARKED IN THE FIELD BY OWNER'S REPRESENTATIVE.
10. THE GRADING CONTRACTOR SHALL PROOF-ROLL THE CONSTRUCTION AREA WITH A FULLY-LOADED TANDEM-AXLE DUMP TRUCK, OR APPROVED EQUAL, BY
MAKING 2 COMPLETE PASSES IN EACH OF 2 PERPENDICULAR DIRECTIONS. ALL SOFT SPOTS SHALL BE UNDERCUT AND RE-COMPACTED WITH SUITABLE
STRUCTURAL FILL MATERIAL. MINIMUM AXLE WEIGHT = 10 TONS.
11. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND
PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND WILL NOT BE LIMITED TO NORMAL WORKING HOURS.
THE DUTY OF THE ENGINEER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE
ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES, IN, ON, OR NEAR THE CONSTRUCTION SITE. THE CONTRACTOR WILL BE RESPONSIBLE FOR
PROVIDING AND MAINTAINING ALL BARRICADES, WARNING SIGNS, FLASHING LIGHTS, AND TRAFFIC CONTROL DEVICES DURING CONSTRUCTION. THE
CONTRACTOR IS TO COMPLY WITH ALL OSHA REGULATIONS, REQUIREMENTS, AND SAFETY MEETING REQUIREMENTS.
12. ALL NEW ELEVATIONS SHOWN ARE FINISH GRADE ELEVATION. THE GRADING CONTRACTOR SHALL DEDUCT THE FOLLOWING FOR SUBGRADE ELEVATION:
BUILDING FLOOR - SEE ARCHITECTURAL PLANS
HEAVY DUTY PAVEMENT - 11"
LIGHT DUTY PAVEMENT - 8"
PCC PAVEMENT - 12"
SIDEWALKS - 4"
TURF AREAS - 4"
13. THE CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION THAT ARE WITHIN 5 FEET OF NEW CONSTRUCTION. REMOVE DEBRIS FROM SITE OR BURN IN
ACCORDANCE WITH LOCAL LAWS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING NECESSARY BURNING PERMITS. PROTECT ALL TREES THAT
ARE TO REMAIN.
14. TOPSOIL SHALL BE STRIPPED TO A DEPTH AS REQUIRED BY OWNER OR GEOTECH AND STOCKPILED AS DIRECTED BY THE OWNER'S REPRESENTATIVE.
15. THE TOP 18" OF FILL SHALL BE COMPACTED TO 98% OF MAXIMUM DRY DENSITY BY THE STANDARD PROCTOR METHOD ASTM D-698. ALL OTHER FILL SHALL BE
COMPACTED TO 95% MAXIMUM DRY DENSITY. MOISTURE SHALL BE CONTROLLED TO WITHIN ±2% OF OPTIMUM.
16. ALL EXCAVATION SHALL BE "CLASSIFIED EXCAVATION". EXCAVATION SHALL BE "CLASSIFIED" AS "COMMON EXCAVATION" OR "ROCK EXCAVATION". ROCK
EXCAVATION SHALL BE CLASSIFIED AS FOLLOWS:
MASSIVE ROCK EXCAVATION - ANY MATERIAL WHICH CANNOT BE EXCAVATED WITH A SINGLE TOOTH RIPPER DRAWN BY A CRAWLER TRACTOR HAVING A
MINIMUM DRAW BAR RATED AT NOT LESS THAN 53,000 POUNDS (CATERPILLAR D-8 OR EQUIVALENT) AND OCCUPYING AN ORIGINAL VOLUME OF AT LEAST ONE
CUBIC YARD OR MORE.
TRENCH EXCAVATION - ANY MATERIAL WHICH CANNOT BE EXCAVATED WITH A POWER SHOVEL HAVING THE CAPACITY OF AT LEAST THAT OF A CATERPILLAR
225 AND OCCUPYING AN ORIGINAL VOLUME OF AT LEAST 1/2 CUBIC YARD OR MORE.
COMMON EXCAVATION SHALL INCLUDE ALL MATERIALS THAT CAN BE RIPPED, BOULDERS, AND ALL OTHER MATERIALS THAT DO NOT FALL IN THE CATEGORY
OF ROCK EXCAVATION AS DEFINED ABOVE.
17. THE CLASSIFICATION OF SOILS INCLUDE: TOPSOIL, FILL MATERIAL, UNSUITABLE MATERIAL, AND ROCK EXCAVATION. THE CLASSIFICATION OF SOILS IS THE
RESPONSIBILITY OF THE OWNER'S SOIL TESTING FIRM.
18. ALL FILL MATERIAL SHALL CONSIST OF AN APPROVED MATERIAL AND BE FREE OF ORGANIC MATTER AND DEBRIS. IMPORTED FILL SHALL HAVE A MINIMUM
STANDARD PROCTOR MAXIMUM DRY DENSITY OF 95 PCF, CLAY/SILT FINES CONTENT NOT GREATER THAN 25%, AND A PLASTICITY INDEX LESS THAN 15%.
19. ALL EXISTING SLOPES STEEPER THAN 4:1 THAT WILL RECEIVE FILL SHALL BE PLOWED AND SCARIFIED SO NEW FILL WILL BOND WITH EXISTING SURFACE.
20. CONTRACTOR SHALL SCARIFY ALL EXISTING ASPHALT PAVEMENT BEFORE PLACING FILL, UNLESS OVERLAYING ASPHALT ONTO EXISTING ASPHALT.
21. THE GRADING CONTRACTOR SHALL CONFORM TO ELEVATIONS AND DIMENSIONS SHOWN WITHIN A TOLERANCE OF PLUS OR MINUS 0.05 FEET. (FINAL GRADED
SURFACE UNDER BUILDING SLABS SHALL BE WITHIN A TOLERANCE OF 3/8" WHEN MEASURED WITH A 10' STRAIGHT EDGE). (FINAL PAVEMENT WEARING
COURSE SURFACE SHALL BE WITHIN A TOLERANCE OF 3/16" WHEN MEASURED WITH A 10' STRAIGHT EDGE.) (PAVEMENT VARIATION FROM TRUE DESIGN
ELEVATION SHALL BE 1/4" OR LESS.)
22. SPOT ELEVATIONS SHALL TAKE PRECEDENCE OVER CONTOURS AND SLOPES SHOWN. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF SPOT ELEVATIONS
WHICH DO NOT APPEAR TO BE CONSISTENT WITH THE CONTOURS AND SLOPES. SPOT ELEVATIONS SHALL BE USED FOR SETTING ELEVATIONS OF CURB AND
GUTTER AND UTILITIES.
23. IF GRADE ADJUSTMENTS ARE REQUIRED, THE CONTRACTOR SHALL NOTIFY THE THE ENGINEER TO INVESTIGATE SUCH ADJUSTMENTS.
24. GRADES SHOWN AT ALL ENTRANCES ARE DESIGN GRADES. CONTRACTOR SHALL COORDINATE GRADING IN THESE AREAS WITH THE EXISTING FEATURES IN
THE FIELD AND/OR CURRENT DESIGN DRAWINGS.
25. SITE CONTRACTOR SHALL EXTEND UNDERGROUND ROOF DRAINAGE PIPING TO WITHIN 5 FT OF BUILDING FOR CONNECTION TO ROOF DOWNSPOUTS.
CONNECTIONS SHALL BE COORDINATED WITH BUILDING CONTRACTOR.
26. ALL ROADS AND PARKING LOTS SHALL HAVE A MINIMUM 3'-0" WIDE GRASSED SHOULDER. A 5'-0" WIDE SHOULDER IS PREFERRED AND SHALL BE PROVIDED
WHERE POSSIBLE.
27. ALL REINFORCED CONCRETE PIPE (RCP) SHALL BE CLASS III, UNLESS NOTED ON DRAWINGS WITH BELL & SPIGOT ENDS AND SHALL CONFORM TO ALL
REQUIREMENTS OF ASTM C 76, LATEST EDITION, INSTALLED WITH FLEXIBLE PLASTIC (BITUMEN) GASKETS AT ALL JOINTS. GASKETS SHALL COMPLY WITH
AASHTO M-198 751, TYPE B, AND SHALL BE INSTALLED IN STRICT ACCORDANCE WITH PIPE MANUFACTURER'S RECOMMENDATIONS.
28. ALL CORRUGATED PLASTIC PIPE SHALL MEET THE REQUIREMENTS OF AASHTO M-294, TYPE S, SHALL BE SMOOTH INTERIOR WITH ANNULAR CORRUGATED
EXTERIOR. HI-Q SURE-LOCK 10.8 PIPE, ADS, N-12, OR APPROVED EQUAL. ALL JOINTS SHALL BE BELL AND SPIGOT AND SHALL MEET THE REQUIREMENTS OF
AASHTO M-294, SHALL BE WATERTIGHT, MEETING THE REQUIREMENTS OF ASTM D 3212. THE GASKETS SHALL BE MADE OF POLYISOPRENE MEETING THE
REQUIREMENTS OF ASTM F 477. INSTALLATION SHALL CONFORM TO AASHTO M-294, ASTM D-2321, AND MANUFACTURERS INSTALLATION PROCEDURES.
29. ANY REINFORCED CONCRETE PIPE WITH MORE THAN 15 FOOT OF COVER SHALL BE CLASS IV WITH O-RING JOINTS.
30. ALL STORM PIPE LENGTH AND ELEVATIONS (TOPS AND INVERTS) OF STORM DRAINAGE STRUCTURES SHOWN ON THE DRAWINGS ARE APPROXIMATE.
CONTRACTOR MAY HAVE TO FIELD ADJUST AS NECESSARY DURING CONSTRUCTION. THE CONTRACTOR MAY USE PRE-CAST DRAINAGE STRUCTURES AS AN
ALTERNATE FOR STRUCTURES SPECIFIED ON THIS PLAN. HOWEVER, THE OWNER AND CLINE ENGINEERING, INC. ASSUME NO RESPONSIBILITY FOR THESE
STRUCTURES, AS FIELD CONDITIONS DURING CONSTRUCTION OFTEN DICTATE ADJUSTMENTS STORM DRAINAGE STRUCTURES. THE CONTRACTOR RETAINS
ALL RESPONSIBILITY AND EXPENSE FOR MODIFYING THESE PRE-CAST STRUCTURES TO ACCOMMODATE THESE ADJUSTMENTS.
31. ANY REINFORCED CONCRETE PIPE STEEPER THAN 10 PERCENT MUST HAVE CONCRETE COLLARS. CORRUGATED METAL PIPE WITH HUGGER BANDS MAY BE
SUBSTITUTED. THE NUMBER OF CONCRETE COLLARS AND TYPE OF STORM PIPE WILL BE DETERMINED TOGETHER BY THE CONTRACTOR AND THE ENGINEER.
32. ALL SANITARY SEWER WORK SHALL BE CONSTRUCTED TO LINES AND GRADES SHOWN AND AS DETAILED ON THE DRAWINGS. ALL MANHOLE/CLEANOUT TOP
ELEVATIONS ON CIVIL DRAWINGS ARE APPROXIMATE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL MANHOLE/CLEANOUT TOPS ARE
FLUSH WITH PAVEMENT FINISHED GRADE THROUGHOUT THE PROJECT.
33. THE CONTRACTOR SHALL PROVIDE STANDARD CLEAN-OUTS OR MANHOLES AT ALL BENDS AND CHANGES IN GRADE IN SEWER LINES AND CONNECTIONS TO
EXISTING SEWER LINES. PIPE BEDDING AND BACKFILL SHALL BE CAREFULLY CONTROLLED. ALL SANITARY SEWER WORK SHALL COMPLY WITH LOCAL CODES
AND ORDINANCES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING WITH THE LOCAL AND STATE SEWER APPROVAL AUTHORITIES TO INSURE THAT
ALL MATERIALS, INSTALLATION, TESTING, AND AS-BUILT DRAWING REQUIREMENTS WILL BE TO THE SATISFACTION OF THE LOCAL AND STATE AUTHORITIES.
34. ALL WATER LINES SHALL BE INSTALLED AS SHOWN ON THE DRAWINGS. ALL PIPES, VALVES, AND FITTINGS SHALL COMPLY WITH AWWA STANDARDS, ALL LOCAL
AND STATE CODES AND ORDINANCES. PIPE BEDDING AND BACKFILL SHALL BE CAREFULLY CONTROLLED. WATER LINES SHALL BE PRESSURE TESTED, AND
DISINFECTED AS REQUIRED. ALL NECESSARY AS-BUILTS SHALL BE ACCOMPLISHED TO THE SATISFACTION OF THE LOCAL AUTHORITY.
35. ALL UTILITY TRENCHES SHALL BE THOROUGHLY COMPACTED AND TESTED TO PREVENT SETTLEMENT AND DAMAGE TO FUTURE PAVEMENT AND STRUCTURES.
36. ASPHALT PAVING FOR LIGHT DUTY AREAS SHALL BE CONSTRUCTED ON A PREPARED AND WELL-DRAINED SUBGRADE COMPACTED AS SPECIFIED. THE BASE
COURSE SHALL BE CONSTRUCTED WITH 6" COMPACTED THICKNESS STONE BASE. THE SURFACE COURSE SHALL BE CONSTRUCTED WITH 2" COMPACTED
THICKNESS ALL PAVING WORK (MATERIALS AND CONSTRUCTION) SHALL COMPLY WITH STATE SPECIFICATIONS.
37. ASPHALT PAVING FOR HEAVY DUTY AREAS SHALL BE CONSTRUCTED ON A PREPARED AND WELL-DRAINED SUBGRADE COMPACTED AS SPECIFIED. THE BASE
COURSE SHALL BE CONSTRUCTED WITH 8" COMPACTED THICKNESS STONE BASE. THE BINDER COURSE SHALL BE CONSTRUCTED WITH 1.5" COMPACTED
THICKNESS ASPHALT CONCRETE. THE SURFACE COURSE SHALL BE CONSTRUCTED WITH 1.5" COMPACTED THICKNESS ASPHALT CONCRETE. ALL PAVING
WORK (MATERIALS AND CONSTRUCTION) SHALL COMPLY WITH STATE SPECIFICATIONS.
38. CONCRETE TRUCK PAVEMENT SHALL BE CONSTRUCTED WITH 4,000 PSI CONCRETE, 6" THICK REINFORCED WITH 6" X 6" - W2.9 X W2.9 W.W.M. JOINTS SHALL BE
CONSTRUCTED AS SHOWN ON DETAILS.
39. CONCRETE SIDEWALKS SHALL BE CONSTRUCTED WITH 3,000 PSI CONCRETE, 4" THICK NON-REINFORCED WITH JOINTS AS SHOWN ON DETAILS.
40. ALL AREAS NOT COVERED BY BUILDINGS AND PAVEMENT SHALL RECEIVE TOPSOIL AND BE GRASSED IN ACCORDANCE WITH SPECIFICATIONS.
41. CONCRETE CURB AND GUTTER SHALL BE 18" WIDE WITH 6" CURB CONSTRUCTED WITH 3,000 PSI CONCRETE WITH EXPANSION JOINTS AND CONTRACTION
JOINTS INSTALLED TO COMPLY WITH S.C.D.O.T. STANDARD SPECIFICATION FOR MATERIALS AND CONSTRUCTION OF CURB AND GUTTER.
42. THE GRADING CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE AWAY FROM BUILDING AT ALL TIMES. CONTRACTOR SHALL BRING TO THE ATTENTION OF
THE ENGINEER ANY AREAS THAT MAY NOT DRAIN PROPERLY DURING CONSTRUCTION.
43. GRADING CONTRACTOR SHALL INCLUDE IN COST ALL CUT/FILL AND IMPORT/EXPORT NECESSARY FOR EARTHWORK BALANCE. CONTRACTOR SHALL INCLUDE
IN COST ALL WETTING/DRYING OF SOILS NECESSARY TO ACHIEVE COMPACTION PER SPECIFICATIONS.
44. THE CONTRACTOR SHALL CONFORM TO THE CONSTRUCTION SEQUENCE.
45. THE CONTRACTOR SHALL CONSTRUCT TEMPORARY SEDIMENT TRAPS BEFORE OTHER SITE GRADING AND SITEWORK IS BEGUN. THE SEDIMENT TRAPS AND
SEDIMENT CONTROL DURING CONSTRUCTION SHALL COMPLY WITH ALL LOCAL CODES AND REGULATIONS. AFTER ALL SITEWORK IS COMPLETED AND
GRASSING ESTABLISHED, THE GRADING CONTRACTOR SHALL REMOVE ALL SILT FROM THE SITE AND LEGALLY DISPOSE OF ALL SILT OFF-SITE AT NO
ADDITIONAL COST TO THE OWNER.
46. THE CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE WHEN INSTRUCTIONS FROM REGULATORY AGENCIES ARE RECEIVED AND COMPLY WITH
INSTRUCTIONS AS DIRECTED BY THE OWNER'S REPRESENTATIVE.
47. THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE CONSTRUCTION DOCUMENTS AND SHALL AT ONCE REPORT TO THE ENGINEER ANY
INCONSISTENCIES OR OMISSIONS DISCOVERED. THE CONTRACTOR SHALL TAKE FIELD MEASUREMENTS TO VERIFY THAT ALL LOCATIONS ARE CORRECT
PRIOR TO COMMENCING CONSTRUCTION.
48. THE CONTRACTOR SHALL NOT PERFORM ANY WORK ON ANY UTILITIES OR IN ANY PUBLIC RIGHT-OF-WAYS UNTIL HE HAS OBTAINED COPIES OF ALL
NECESSARY ENCROACHMENT AND CONSTRUCTION PERMITS. ANY FIELD CHANGES WITHIN SCDOT R/W OR CHANGES THAT WOULD IMPACT SCDOT R/W WILL
REQUIRE WRITTEN SCDOT APPROVAL PRIOR TO CHANGES BEING IMPLEMENTED IN THE FIELD. (E.G. DRAINAGE, GRADING, ACCESS DESIGN ETC..).
49. THE CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN FOR ALL LANE AND SHOULDER CLOSURES WILL NEED TO BE SUBMITTED FOR ALL WORK WITHIN
THE R/W PRIOR TO CONSTRUCTION. NIGHT WORK COULD BE REQUIRED FOR ANY AND ALL LANE CLOSURES.
50. THE OWNER SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF DRIVEWAYS AND OTHER ACCESS POINTS, INCLUDING ANY NEW DRAINAGE STRUCTURES,
FOR AREAS WITHIN THE RIGHTS-OF-WAYS OF STATE MAINTAINED FACILITIES IN PERPETUITY.
51. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING ANY EXISTING UTILITIES NECESSARY FOR SITE CONSTRUCTION INCLUDING ALL PERMITS AND
FEES.
52. THE CONTRACTOR SHALL VERIFY BENCH MARK LOCATION AND ELEVATION WITH SURVEYOR BEFORE BEGINNING CONSTRUCTION.
53. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL EASEMENTS ON THE SITE BEFORE PROCEEDING WITH CONSTRUCTION.
54. ALL PARKING LOT STRIPING IS TO BE PER SOUTH CAROLINA D.O.T. SPECIFICATIONS AND HAVE TWO (2) COATS OF PAINT. THE CONTRACTOR IS RESPONSIBLE
FOR PROVIDING FIRE LANE STRIPING AND SIGNAGE TO MEET LOCAL REQUIREMENTS. THE BASES OF ALL LIGHT POLES, ALL SPEED BUMPS, ALL BOLLARDS,
AND ALL FACES OF SIDEWALK THAT ARE NOT FLUSH WITH ASPHALT ARE TO BE PAINTED TRAFFIC YELLOW.
55. IN THE CASE OF A CONFLICT IN SPECIFICATIONS, NOTES, OR DETAILS, THE STRICTER SHALL GOVERN.
DEMOLITION NOTES
1. DEMOLITION INCLUDES THE REMOVAL AND DISPOSAL OF DEMOLISHED MATERIALS, AS SHOWN ON THE DRAWINGS AND HEREIN SPECIFIED.
2. CONDITIONS EXISTING AT THE TIME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY THE OWNER IN SO FAR AS PRACTICABLE, HOWEVER,
VARIATIONS MAY OCCUR.
3. STORAGE OR SALE OF DEMOLISHED MATERIAL ON THE SITE WILL NOT BE PERMITTED.
4. THE USE OF EXPLOSIVES WILL BE PERMITTED ONLY WHEN AUTHORIZED BY THE CONSTRUCTION PROJECT MANAGER.
5. CONDUCT DEMOLITION OPERATIONS AND THE REMOVAL OF DEBRIS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, WALKS, AND OTHER
ADJACENT OCCUPIED OR USED FACILITIES OR ADJACENT CONSTRUCTION PROCESSES.
6. DO NOT CLOSE OR OBSTRUCT STREETS, WALKS OR OTHER OCCUPIED OR USED FACILITIES WITHOUT PERMISSION FROM THE CONSTRUCTION PROJECT
MANAGER AND THE AUTHORITIES HAVING JURISDICTION. PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC WAYS IF REQUIRED BY
GOVERNING REGULATIONS.
7. ENSURE THE SAFE PASSAGE OF PERSONS AROUND THE AREA OF DEMOLITION. CONDUCT OPERATIONS TO PREVENT INJURY TO ADJACENT BUILDINGS,
STRUCTURES, OTHER FACILITIES, AND PERSONS.
8. PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION OPERATIONS AT NO COST TO THE OWNER.
9. MAINTAIN EXISTING UTILITIES, INDICATED TO REMAIN, KEEP IN SERVICE, AND PROTECT AGAINST DAMAGE DURING DEMOLITION OPERATIONS. CONTRACTOR
SHALL FIELD LOCATE AND VERIFY ALL UTILITIES ON SITE.
10. DO NOT INTERRUPT EXISTING UTILITIES SERVING OCCUPIED OR USED FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING FROM THE CONSTRUCTION
PROJECT MANAGER AND THE AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING UTILITIES, AS
ACCEPTABLE TO THE GOVERNING AUTHORITIES. NOTIFY ALL BUSINESSES IMPACTED IN ADVANCE OF ALL SCHEDULED UTILITY INTERRUPTIONS.
11. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION.
12. DEMOLISH CONCRETE AND MASONRY IN SMALL SECTIONS.
13. COMPLETELY FILL BELOW-GRADE AREAS AND VOIDS RESULTING FROM THE DEMOLITION OF STRUCTURES BELOW GRADE.
14. PLACE FILL MATERIALS IN HORIZONTAL LAYERS NOT EXCEEDING 6" IN LOOSE DEPTH. COMPACT EACH LAYER AT OPTIMUM MOISTURE CONTENT OF THE FILL
MATERIAL TO A DENSITY EQUAL TO THE ORIGINAL ADJACENT GROUND, UNLESS SUBSEQUENT EXCAVATION FOR NEW WORK IS REQUIRED. AFTER FILL
PLACEMENT AND COMPACTION, GRADE THE SURFACE TO MEET ADJACENT CONTOURS AND TO PROVIDE FLOW TO SURFACE DRAINAGE STRUCTURES.
15. REMOVE FROM THE SITE DEBRIS, RUBBISH, AND OTHER MATERIALS RESULTING FROM DEMOLITION OPERATIONS, OR AS DIRECTED BY THE CONSTRUCTION
PROJECT MANAGER AND LEGALLY DISPOSE OF DEBRIS "OFF-SITE".
16. ALL PIPING, FENCING AND OTHER MATERIALS THAT INTERFERE WITH NEW CONSTRUCTION SHALL BE REMOVED OR ABANDONED AS DIRECTED BY THE
CONSTRUCTION PROJECT MANAGER.
17. ALL SALVAGEABLE MATERIALS WILL REMAIN THE PROPERTY OF THE OWNER. THE CONTRACTOR SHALL REMOVE AND STORE THIS MATERIAL AS DIRECTED BY
THE CONSTRUCTION PROJECT MANAGER.
18. TRANSPORT MATERIALS REMOVED FROM DEMOLISHED STRUCTURES AND DISPOSE OF "OFF" SITE AS REQUIRED. DEBRIS SHALL NOT BE "BURIED" OR LEFT ON
SITE EXCEPT AS ALLOWED BY ALL APPLICABLE LAWS AND BY THE GEOTECHNICAL ENGINEER.
19. THE CONTRACTOR IS TO MAINTAIN MINIMUM COVER OVER ALL UTILITY LINES THROUGHOUT CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR
REPAIRING ANY DAMAGE TO UTILITY LINES AT NO ADDITIONAL COST TO THE OWNER.
20. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO THE SITE OR TO THE BUILDING AND IMPROVEMENTS ON THE SITE THAT OCCUR DURING
CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.
21. THE CONTRACTOR MUST VISIT SITE PRIOR TO SUBMITTING BID AND INCLUDE IN HIS PRICE ALL DEMOLITION AND DISPOSAL COSTS TO REMOVE/RELOCATE ANY
AND ALL ITEMS THAT MAY INTERFERE WITH NEW CONSTRUCTION.
22. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES AND COORDINATE THE DEMOLITION, REMOVAL, RELOCATION, ABANDONMENT, ETC. OF ALL
UTILITIES THAT INTERFERE WITH NEW CONSTRUCTION. ANY DEMOLITION AND RELOCATION SHOWN IS SCHEMATIC ONLY. THE CONTRACTOR IS RESPONSIBLE
FOR COORDINATING THE DESIGN, CONSTRUCTION, AND EASEMENTS OF ALL UTILITY WORK WITH THE APPROPRIATE UTILITIES.
23. DEMOLISH ALL EXISTING UTILITIES THAT LIE UNDER AND 10' OUTSIDE OF NEW BUILDING. THE EXISTING UTILITIES 10' OR MORE OUTSIDE NEW BUILDINGS MAY
BE DRAINED AND FILLED WITH FLOWABLE FILL IF TESTING COMPANY APPROVES EXISTING BACKFILL.
TEMPORARY SEEDING
DESCRIPTION
THE PURPOSE OF TEMPORARY SEEDING IS TO REDUCE EROSION AND SEDIMENTATION BY STABILIZING DISTURBED AREAS THAT WOULD OTHERWISE LAY BARE FOR
LONG PERIODS OF TIME BEFORE THEY ARE WORKED OR STABILIZED. TEMPORARY SEEDING IS ALSO USED WHERE PERMANENT VEGETATION GROWTH IS NOT
NECESSARY OR APPROPRIATE.
WHEN AND WHERE TO USE IT
TEMPORARY SEEDING IS USED ON EXPOSED SOIL SURFACES SUCH AS DENUDED AREAS, SOIL STOCKPILES, DIKES, DAMS, BANKS OF SEDIMENT BASINS, BANKS OF
SEDIMENT TRAPS, AND TEMPORARY ROAD BANKS. TEMPORARY SEEDING PREVENTS AND LIMITS COSTLY MAINTENANCE OPERATIONS ON OTHER SEDIMENT
CONTROL STRUCTURES. SEDIMENT CLEANOUT REQUIREMENTS FOR SEDIMENT BASINS, SEDIMENT, TRAPS, AND SILT FENCE IS REDUCED IF THE DRAINAGE AREA IS
SEEDED WHEN GRADING AND CONSTRUCTION OPERATION ARE NOT TAKING PLACE.
TEMPORARY STABILIZATION IS REQUIRED WITHIN 14 DAYS AFTER CONSTRUCTION ACTIVITY IS COMPLETE UNLESS CONSTRUCTION ACTIVITY IS GOING TO RESUME
WITHIN 21 DAYS. COVER SEEDED AREAS WITH AN APPROPRIATE MULCH TO PROVIDE PROTECTION FROM THE WEATHER. WHEN THE TEMPORARY VEGETATION
DOES NOT GROW QUICKLY OR THICK ENOUGH TO PREVENT EROSION, RE-SEED AS SOON AS POSSIBLE. KEEP SEEDED AREAS ADEQUATELY MOIST. IRRIGATE THE
SEEDED AREA IF NORMAL RAINFALL IS NOT ADEQUATE FOR THE GERMINATION AND GROWTH OF SEEDLINGS. WATER SEEDED AREAS AT CONTROLLED RATES THAT
ARE LESS THAN THE RATE AT WHICH THE SOIL CAN ABSORB WATER TO PREVENT RUNOFF. RUNOFF OF IRRIGATION WATER WASTES WATER AND CAN CAUSE
EROSION.
SEED SELECTION
SEED SELECTION IS BASED ON GEOGRAPHICAL LOCATION, SOIL TYPE AND THE SEASON OF THE YEAR IN WHICH THE PLANTING IS TO BE DONE. USE THE TABLES IN
APPENDIX C AS A GUIDE FOR CONVENTIONAL TILLAGE METHODS (PLOWING, SEEDBED PREPARATION, HYDROSEEDING, ETC). IF A FAST GROWING CROP TO NURSE
THE PERMANENT SPECIE OR SPECIES IS REQUIRED, THEN USE THE MIX RATE. FAILURE TO CAREFULLY FOLLOW AGRONOMIC RECOMMENDATIONS RESULTS IN AN
INADEQUATE STAND OF TEMPORARY VEGETATION THAT PROVIDES LITTLE OR NO EROSION CONTROL.
INSTALLATION
TILLAGE: IF THE AREA HAS BEEN RECENTLY PLOWED, NO TILLAGE IS REQUIRED OTHER THAN RAKING OR SURFACE ROUGHENING TO BREAK ANY CRUST THAT
HAS FORMED LEAVING A TEXTURED SURFACE. DISK THE SOIL FOR OPTIMAL GERMINATION WHEN THE SOIL IS COMPACTED LESS THAN 6-INCHES.
SOIL TESTING: SOIL TESTING IS AVAILABLE THROUGH CLEMSON UNIVERSITY COOPERATIVE EXTENSION SERVICE.
LIME: LIME IS NOT REQUIRED FOR TEMPORARY SEEDING UNLESS A SOIL TEST SHOWS THAT THE SOIL PH IS BELOW 5.0. IT MAY BE DESIRABLE TO APPLY LIME
DURING THE TEMPORARY SEEDING OPERATION TO BENEFIT THE LONG-TERM PERMANENT SEEDING.
FERTILIZER: APPLY A MINIMUM OF 1.5 TONS OF LIME/ACRE (70 POUNDS PER 1000 SQUARE FEET) IF IT IS TO BE USED.APPLY A MINIMUM OF 500 POUNDS PER
ACRE OF 10-10-10 FERTILIZER (11.5 POUNDS PER 1000 SQUARE FEET) OR EQUIVALENT DURING TEMPORARY SEEDING UNLESS A SOIL TEST INDICATES A
DIFFERENT REQUIREMENT. INCORPORATE FERTILIZER AND LIME (IF USED) INTO THE TOP 4-6 INCHES OF THE SOIL BY DISKING OR OTHER MEANS WHERE
CONDITIONS ALLOW.
SEEDING: LOOSEN THE SOIL SURFACE BEFORE BROADCASTING THE SEED. APPLY SEED EVENLY BY THE MOST CONVENIENT METHOD AVAILABLE FOR THE
TYPE OF SEED USED AND THE LOCATION OF THE TEMPORARY SEEDING. TYPICAL APPLICATION METHODS INCLUDE BUT ARE NOT LIMITED TO CYCLONE
SEEDERS, ROTARY SPREADERS, DROP SPREADERS, BROADCAST SPREADERS, HAND SPREADERS, CULTIPACKER SEEDER, AND HYDRO-SEEDERS. COVER
APPLIED SEED BY RAKING OR DRAGGING A CHAIN, AND THEN LIGHTLY FIRM THE AREA WITH A ROLLER OR CULTIPACKER.
MULCHING: USE MULCH WITH TEMPORARY SEED APPLICATIONS TO RETAIN SOIL MOISTURE AND REDUCE EROSION DURING THE ESTABLISHMENT OF
VEGETATION. TYPICAL MULCH APPLICATIONS INCLUDE STRAW, WOOD FIBER, HYDROMULCHES, BFM AND FGM. USE HYDROMULCHES WITH A MINIMUM BLEND
OF 70% WOOD FIBERS. THE MOST COMMONLY ACCEPTED MULCH USED IN CONJUNCTION WITH TEMPORARY SEEDING IS SMALL GRAIN STRAW. THIS STRAW
SHOULD BE DRY AND FREE FROM MOLD DAMAGE AND NOXIOUS WEEDS. THE STRAW MAY NEED TO BE ANCHORED WITH NETTING OR EMULSIONS TO PREVENT
IT FROM BEING BLOWN OR WASHED AWAY. APPLY THE STRAW MULCH BY HAND OR MACHINE AT THE RATE 1.5-2 TONS PER ACRE (90 POUNDS PER 1000
SQUARE FEET). FREQUENT INSPECTIONS ARE NECESSARY TO CHECK THAT CONDITIONS FOR GROWTH ARE GOOD.
IRRIGATION: SEEDED AREAS SHOULD BE KEPT ADEQUATELY MOIST. IRRIGATE THE SEEDED AREA IF NORMAL RAINFALL IS NOT ADEQUATE FOR THE
GERMINATION AND GROWTH OF SEEDLINGS. WATER SEEDED AREAS AT CONTROLLED RATES THAT ARE LESS THAN THE RATE AT WHICH THE SOIL CAN
ABSORB WATER TO PREVENT RUNOFF. RUNOFF OF IRRIGATION WATER WASTES WATER AND CAN CAUSE EROSION.
RE-SEEDING: RE-SEED AREAS WHERE SEEDING DOES NOT GROW QUICKLY, THICK ENOUGH, OR ADEQUATELY TO PREVENT EROSION. BASE SEED SELECTION
SHOULD ON THE REQUIREMENTS OF LOCAL SPECIFICATIONS.
INSPECTION AND MAINTENANCE
INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24-HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES ½-INCHES OR MORE OF PRECIPITATION.
COVER SEEDED WITH MULCH TO PROVIDE PROTECTION. FREQUENT INSPECTIONS ARE NECESSARY TO CHECK THAT CONDITIONS FOR GROWTH ARE GOOD.
SUPPLY TEMPORARY SEEDING WITH ADEQUATE MOISTURE. SUPPLY WATER AS NEEDED, ESPECIALLY IN ABNORMALLY HOT OR DRY WEATHER OR ON
ADVERSE SITES. CONTROL WATER APPLICATION RATES TO PREVENT RUNOFF.
BASE SEED SELECTION ON LOCAL SPECIFICATIONS.
RE-SEED AREAS WHERE THE PLANTS DO NOT GROW QUICK ENOUGH, THICK ENOUGH, OR ADEQUATELY ENOUGH TO PREVENT EROSION SHOULD BE
RE-SEEDED.
PERMANENT SEEDING
DESCRIPTION
CONTROLLING RUNOFF AND PREVENTING EROSION BY ESTABLISHING A PERENNIAL VEGETATIVE COVER WITH SEED.
WHEN AND WHERE TO USE IT
A MAJOR CONSIDERATION IN THE SELECTION OF THE TYPE OF PERMANENT GRASS TO ESTABLISH IS THE INTENDED USE OF THE LAND. LAND USE IS SEPARATED IN
TO TWO CATEGORIES, HIGH-MAINTENANCE AND LOW-MAINTENANCE.
HIGH-MAINTENANCE: HIGH MAINTENANCE AREAS ARE MOWED FREQUENTLY, LIME OR FERTILIZED ON A REGULAR BASIS, AND REQUIRE MAINTENANCE TO AN
AESTHETIC STANDARD. LAND USES WITH HIGH MAINTENANCE GRASSES INCLUDE HOMES, INDUSTRIAL PARKS, SCHOOLS, CHURCHES, AND RECREATIONAL
AREAS SUCH AS PARKS, ATHLETIC FIELDS, AND GOLF COURSES.
LOW-MAINTENANCE: LOW MAINTENANCE AREAS ARE MOWED INFREQUENTLY, IF AT ALL, AND LIME AND FERTILIZER MAY NOT BE APPLIED ON A REGULAR
SCHEDULE. THESE AREAS ARE NOT SUBJECT TO INTENSE USE AND DO NOT REQUIRE A UNIFORM APPEARANCE. THE VEGETATION MUST BE ABLE TO SURVIVE
WITH LITTLE MAINTENANCE OVER LONG PERIODS OF TIME. GRASS AND LEGUME MIXTURES ARE FAVORED IN THESE AREAS BECAUSE LEGUMES ARE CAPABLE
OF FIXING NITROGEN IN THE SOIL FOR THEIR OWN USE AND THE USE OF THE GRASSES AROUND THEM. LAND USES REQUIRING LOW-MAINTENANCE GRASSES
INCLUDE STEEP SLOPES, STREAM AND CHANNEL BANKS, ROAD BANKS, AND COMMERCIAL AND INDUSTRIAL AREAS WITH LIMITED ACCESS.
SEED SELECTION
THE USE OF NATIVE SPECIES IS PREFERRED WHEN SELECTING VEGETATION. BASE PLANT SEED SELECTION ON GEOGRAPHICAL LOCATION, THE TYPE OF SOIL, THE
SEASON OF THE YEAR IN WHICH THE PLANTING IS TO BE DONE, AND THE NEEDS AND DESIRES OF THE PERMANENT LAND USER. FAILURE TO CAREFULLY FOLLOW
AGRONOMIC RECOMMENDATIONS RESULTS IN AN INADEQUATE STAND OF PERMANENT VEGETATION THAT PROVIDES LITTLE OR NO EROSION CONTROL.
INSTALLATION
TOPSOIL: APPLY TOPSOIL IF THE SURFACE SOIL OF THE SEEDBED IS NOT ADEQUATE FOR PLANT GROWTH.
TILLAGE: IF THE AREA HAS BEEN RECENTLY PLOWED, NO TILLAGE IS REQUIRED OTHER THAN RAKING OR SURFACE ROUGHENING TO BREAK ANY CRUST THAT
HAS FORMED LEAVING A TEXTURED SURFACE. DISK THE SOIL FOR OPTIMAL GERMINATION WHEN THE SOIL IS COMPACTED LESS THAN 6-INCHES. IF THE SOIL
IS COMPACTED MORE THAN 6-INCHES, SUB-SOILED AND DISK THE AREA.
SOIL TESTING: SOIL TESTING IS AVAILABLE THROUGH CLEMSON UNIVERSITY COOPERATIVE EXTENSION SERVICE.
LIME: UNLESS A SPECIFIC SOIL TEST INDICATES OTHERWISE, APPLY 1½ TONS OF GROUND COURSE TEXTURED AGRICULTURAL LIMESTONE PER ACRE (70
POUNDS PER 1000 SQUARE FEET).
FERTILIZER: APPLY A MINIMUM OF 1000 POUNDS PER ACRE OF A COMPLETE 10-10-10 FERTILIZER (23 POUNDS PER 1000 SQUARE FEET) OR EQUIVALENT
DURING PERMANENT SEEDING OF GRASSES UNLESS A SOIL TEST INDICATES A DIFFERENT REQUIREMENT. INCORPORATE FERTILIZER AND LIME (IF USED) INTO
THE TOP 4-6 INCHES OF THE SOIL BY DISKING OR OTHER MEANS WHERE CONDITIONS ALLOW. DO NOT MIX THE LIME AND THE FERTILIZER PRIOR TO THE FIELD
APPLICATION.
SEEDING: LOOSEN THE SURFACE OF THE SOIL JUST BEFORE BROADCASTING THE SEED. EVENLY APPLY SEED BY THE MOST CONVENIENT METHOD AVAILABLE
FOR THE TYPE OF SEED APPLIED AND THE LOCATION OF THE SEEDING. TYPICAL APPLICATION METHODS INCLUDE BUT ARE NOT LIMITED TO CYCLONE
SEEDERS, ROTARY SPREADERS, DROP SPREADERS, BROADCAST SPREADERS, HAND SPREADERS, CULTIPACKER SEEDER, AND HYDRO-SEEDERS. COVER
APPLIED SEED BY RAKING OR DRAGGING A CHAIN OR BRUSH MAT, AND THEN LIGHTLY FIRM THE AREA WITH A ROLLER OR CULTIPACKER. DO NOT ROLL SEED
THAT IS APPLIED WITH A HYDRO-SEEDER AND HYDRO-MULCH.
MULCHING: COVER ALL PERMANENT SEEDED AREAS WITH MULCH IMMEDIATELY UPON COMPLETION OF THE SEEDING APPLICATION TO RETAIN SOIL MOISTURE
AND REDUCE EROSION DURING ESTABLISHMENT OF VEGETATION. APPLY THE MULCH EVENLY IN SUCH A MANNER THAT IT PROVIDES A MINIMUM OF 75%
COVERAGE. TYPICAL MULCH APPLICATIONS INCLUDE STRAW, WOOD FIBER, HYDROMULCHES, BFM AND FGM. USE HYDROMULCHES WITH A MINIMUM BLEND OF
70% WOOD FIBERS. THE MOST COMMONLY ACCEPTED MULCH USED IN CONJUNCTION WITH PERMANENT SEEDING IS SMALL GRAIN STRAW. SELECT STRAW
THAT IS DRY AND FREE FROM MOLD DAMAGE AND NOXIOUS WEEDS. THE STRAW MAY NEED TO BE ANCHORED WITH NETTING OR ASPHALT EMULSIONS TO
PREVENT IT FROM BEING BLOWN OR WASHED AWAY. APPLY STRAW MULCH BY HAND OR MACHINE AT THE RATE 2 TONS PER ACRE (90 POUNDS PER 1000
SQUARE FEET). FREQUENT INSPECTIONS ARE NECESSARY TO CHECK THAT CONDITIONS FOR GROWTH ARE GOOD.
IRRIGATION: KEEP PERMANENT SEEDED AREAS ADEQUATELY MOIST, ESPECIALLY LATE IN THE SPECIFIC GROWING SEASON. IRRIGATE THE SEEDED AREA IF
NORMAL RAINFALL IS NOT ADEQUATE FOR THE GERMINATION AND GROWTH OF SEEDLINGS. WATER SEEDED AREAS AT CONTROLLED RATES THAT ARE LESS
THAN THE RATE AT WHICH THE SOIL CAN ABSORB WATER TO PREVENT RUNOFF. RUNOFF OF IRRIGATION WATER WASTES WATER AND CAN CAUSE EROSION.
RE-SEEDING: INSPECT PERMANENTLY SEEDED AREAS FOR FAILURE, MAKE NECESSARY REPAIRS AND RE-SEED OR OVERSEED WITHIN THE SAME GROWING
SEASON IF POSSIBLE. IF THE GRASS COVER IS SPARSE OR PATCHY, RE-EVALUATE THE CHOICE OF GRASS AND QUANTITIES OF LIME AND FERTILIZER APPLIED.
FINAL STABILIZATION BY PERMANENT SEEDING OF THE SITE REQUIRES THAT IT BE COVERED BY A 70% COVERAGE RATE.
INSPECTION AND MAINTENANCE FOR PERMANENT SEEDING
INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS AND RE-SEED IMMEDIATELY. CONDUCT A FOLLOW-UP SURVEY AFTER ONE YEAR AND
REPLACE FAILED PLANTS WHERE NECESSARY.
IF VEGETATIVE COVER IS INADEQUATE TO PREVENT RILL EROSION, OVERSEED AND FERTILIZE IN ACCORDANCE WITH SOIL TEST RESULTS.
IF A STAND OF PERMANENT VEGETATION HAS LESS THAN 40 PERCENT COVER, RE-EVALUATE CHOICE OF PLANT MATERIALS AND QUANTITIES OF LIME AND
FERTILIZER.
RE-ESTABLISH THE STAND FOLLOWING SEED BED PREPARATION AND SEEDING RECOMMENDATIONS, OMITTING LIME AND FERTILIZER IN THE ABSENCE OF
SOIL TEST RESULTS.
IF THE SEASON PREVENTS RE-SOWING, MULCH IS AN EFFECTIVE TEMPORARY COVER.
FINAL STABILIZATION OF THE SITE REQUIRES A 70 PERCENT OVERALL COVERAGE RATE. THIS DOES NOT MEAN THAT 30 PERCENT OF THE SITE CAN REMAIN
BARE. THE COVERAGE IS DEFINED AS LOOKING AT A SQUARE YARD OF COVERAGE, IN WHICH 70 PERCENT OF THAT SQUARE YARD IS COVERED WITH
VEGETATION.
TEMPORARY SEEDING - COASTAL
SPECIESRATES PER ACREPLANTING DATES
SANDY, DROUGHTY SITES
BROWNTOP MILLET40 LBS.MAR. 10 - SEPT. 1
RYE, GRAIN56 LBS.SEPT. 1 - MAR. 15
RYEGRASS50 LBS.SEPT. 1 - APR. 15
WELL DRAINED, CLAYEY/LOAMEY SITES
BROWNTOP MILLET OR JAPANESE MILLET40 LBS.MAR. 15 - SEPT. 1
RYE, GRAIN
OR OATS
56 LBS.
75 LBS.
SEPT. 1 - MAR. 15
RYEGRASS50 LBS.SEPT. 1 - APR. 15
PERMANENT SEEDING - COASTAL
SPECIESRATES PER ACREPLANTING DATES
SANDY, DROUGHTY SITES
BROWNTOP MILLET
BAHIAGRASS
10 LBS.
40 LBS.
MAR. 10 - SEPT. 1
BROWNTOP MILLET
BAHIAGRASS
SERICEA LESPEDEZA
10 LBS.
30 LBS.
40 LBS.
MAR. 10 - SEPT. 1
BROWNTOP MILLET
ATLANTIC COASTAL
PANICGRASS
10 LBS.
15 LBS.
PLS
MAR. 10 - JUN. 25
BROWNTOP MILLET
SWITCHGRASS (ALAMO)
LITTLE BLUESTEM
SERICEA LESPEDEZA
10 LBS.
8 LBS. PLS
4 LBS.
20 LBS.
MAR. 10 - JUN. 25
BROWNTOP MILLET
WEEPING LOVEGRASS
10 LBS.
8 LBS.
MAR. 10 - JUN. 25
WELL DRAINED, CLAYEY/LOAMEY SITES
BROWNTOP MILLET
BAHIAGRASS
10 LBS.
40 LBS.
MAR. 15 - SEPT. 1
RYE, GRAIN
BAHIAGRASS
CLOVER, CRIMSON (ANNUAL)
10 LBS.
40 LBS.
5 LBS.
SEPT. 1 - NOV. 10
BROWNTOP MILLET
BAHIAGRASS
SERICEA LESPEDEZA
10 LBS.
30 LBS.
40 LBS.
MAR. 15 - SEPT. 1
BROWNTOP MILLET
BERMUDA, COMMON
SERICEA LESPEDEZA
10 LBS.
10 LBS.
40 LBS.
MAR. 15 - SEPT. 1
BROWNTOP MILLET
BERMUDA, COMMON
KOBE LESPEDEZA (ANNUAL)
10 LBS.
12 LBS.
10 LBS.
MAR. 15 - SEPT. 1
BROWNTOP MILLET
BAHIAGRASS
BERMUDA, COMMON
SERICEA LESPEDEZA
10 LBS.
20 LBS.
6 LBS.
40 LBS.
MAR. 15 - SEPT. 1
BROWNTOP MILLET
SWITCHGRASS
LITTLE BLUESTEM
INDIANGRASS
10 LBS.
8 LBS. PLS
3 LBS. PLS
3 LBS. PLS
MAR. 15 - SEPT. 1
85
PLOT DATE: 8/25/2026 1:09:08 PM FILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0028
C L I N EE N G I N E E R I N G
THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING.
REV. DATE DRAWN APPV.DESCRIPTION
SHEET NUMBER
PROJECT MANAGER
DRAWN BY
PROJECT DATE
JOB NUMBER
PROFESSIONAL DESIGN CONSULTING
80 41ST AVENUE
ISLE OF PALMS, SOUTH CAROLINA
IOP MASTER PLAN
22047
AUGUST 2022
AJ/JR
MDC
A 07/29/2026 ISSUED FOR REVIEW AND APPROVAL -- MDC
B 08/24/2026 ISSUED FOR REVIEW AND APPROVAL -- MDC
G-3
GENERAL NOTES
WATER LINES
1. ALL WATER LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND DETAILS. ALL MATERIALS AND PRODUCTS THAT CONTACT POTABLE
WATER MUST BE THIRD PARTY CERTIFIED AS MEETING THE SPECIFICATIONS OF ANSI/NSF STANDARD 61. ALL PIPING MATERIALS AND INSTALLATION SHALL
MEET THE APPROVAL OF THE LOCAL AUTHORITY AND THE STATE HEALTH AUTHORITY.
2. ALL DUCTILE IRON PIPE (DIP) SHALL BE PRESSURE CLASS "350" CONFORMING TO AWWA C151. ALL FITTINGS SHALL BE EITHER MECHANICAL OR PUSH-ON JOINT
AND SHALL COMPLY WITH AWWA C110. ALL POLY-VINYL CHLORIDE WATER LINES 4" AND SMALLER SHALL BE CLASS 200 -SDR21 CONFORMING TO ASTM D-2241
AND ASTM D-1784. WATER LINES 6" AND LARGER SHALL BE 235, DR18, JM EAGLE OR APPROVED EQUAL CONFORMING TO AWWA C-900 AND N.S.F. APPROVED. A
DETECTABLE TAPE WITH THE WORDS "CAUTION: WATERLINE BURIED BELOW" SHALL BE INSTALLED 6" TO 12" ABOVE THE PIPE.
3. SEAMLESS COPPER TUBING, 3" AND SMALLER SHALL BE TYPE "K" ROLL FORM TO COMPLY WITH ASTM B-88, LATEST REVISION AND SHALL BE INSTALLED WITH
WROUGHT COPPER (95-5 TIN ANTIMONY SOLDER JOINT) FITTINGS IN ACCORDANCE WITH ASTM B16.22.
4. ALL WATER LINES SHALL BE PRESSURE TESTED TO 1.5 TIMES THE MAXIMUM WORKING PRESSURE, 150 PSIG (MINIMUM), CLEANED, STERILIZED, AND FLUSHED
UNTIL TWO SUCCESSIVE SATISFACTORY WATER BACTERIOLOGICAL SAMPLES TAKEN AT LEAST 24 HOURS APART ARE OBTAINED. THE SAMPLES SHALL BE
ANALYZED BY A STATE APPROVED LABORATORY. THE RESULTS SHALL INCLUDE BOTH COLIFORM AND NON-COLIFORM GROWTH. ALL BACKFLOW PREVENTION
DEVICES SHALL BE INSPECTED AND CERTIFIED BY A LICENSED INSPECTOR.
5. ALL FIRE HYDRANTS SHALL COMPLY WITH AWWA C502 AND MEET THE APPROVAL OF THE LOCAL WATER AUTHORITY.
6. ALL GATE VALVES SHALL COMPLY WITH AWWA C500, 175 PSI WORKING PRESSURE AND MEET THE APPROVAL OF THE LOCAL WATER AUTHORITY.
7. A MINIMUM OF A DOUBLE CHECK VALVE (BACKFLOW PREVENTOR) ASSEMBLY SHALL BE INSTALLED ON ALL LINES DEDICATED FOR FIRE LINE SPRINKLER
SYSTEMS IN A MANNER ACCEPTABLE TO THE LOCAL AUTHORITY. A BACKFLOW PREVENTION DEVICE MEETING STATE AND LOCAL REQUIREMENTS SHALL BE
INSTALLED ON ALL DOMESTIC WATER LINES.
8. ALL PIPE MATERIAL, SOLDER AND FLUX SHALL BE LEAD FREE (LESS THAN 0.2% LEAD IN SOLDER AND FLUX AND LESS THAN 8.0% LEAD IN PIPES AND FITTINGS).
LUBRICANTS WHICH WILL SUPPORT MICROBIOLOGICAL GROWTH SHALL NOT BE USED FOR SLIP ON JOINTS. VEGETABLE SHORTENING SHALL NOT BE USED TO
LUBRICATE JOINTS. NATURAL RUBBER OR OTHER MATERIAL WHICH WILL SUPPORT MICROBIOLOGICAL GROWTH MAY NOT BE USED FOR ANY GASKETS,
O-RINGS, AND OTHER PRODUCTS USED FOR JOINTING PIPES, SETTING METERS OR VALVES, OR OTHER APPURTENANCES WHICH WILL EXPOSE THE MATERIAL
TO THE WATER.
9. ALL WATER LINES SHALL BE INSPECTED BY THE UTILITY COMPANY AND THE ENGINEER AND CERTIFIED TO THE STATE HEALTH AUTHORITY BEFORE
ACCEPTANCE AND A PERMIT TO OPERATE WILL BE ISSUED AS REQUIRED.
10. ALL WATER LINE SHALL HAVE A MINIMUM 3'-0" COVER.
11. WATER LINE SHALL BE INSTALLED AFTER SANITARY SEWER LINES ARE COMPLETE WHERE THEY CROSS. CONTRACTOR SHALL MAINTAIN A 10' HORIZONTAL
AND 2' VERTICAL CLEARANCE OF WATER AND SEWER LINES. ALL WATER LINES SHALL CROSS ABOVE SEWER LINES.
12. CONTRACTOR SHALL INCLUDE COST OF METER AND TAP FEES IN PROPOSAL. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL EXCAVATION, COORDINATION
AND SCHEDULING OF TAPS. THE CONTRACTOR WILL INSTALL WATER METER AND BOX AS FURNISHED BY THE LOCAL AUTHORITY AND INSTALL SERVICES LINES
TO WITHIN 5' OF BUILDING AS INDICATED ON THE DRAWINGS.
13. THE CONTRACTOR WILL FOLLOW PROCEDURES AS DIRECTED TO FLUSH, STERILIZE AND FURNISH WATER SAMPLES FOR TESTING AS PER AWWA 651 UNTIL
APPROVAL IS GRANTED BY THE STATE HEALTH AUTHORITY AND THE LOCAL WATER SYSTEM. A PERMIT TO OPERATE WILL NOT BE ISSUED UNTIL THE
COMPLETED WATER SYSTEM MEETS ALL REQUIRED STATE AND LOCAL APPROVALS. THE CONTRACTOR IS RESPONSIBLE TO FURNISH THE OWNER WITH A
COMPLETED AND APPROVED WATER SYSTEM ALONG WITH A SET OF APPROVED AS-BUILT DRAWINGS IN A FORMAT ACCEPTABLE TO THE LOCAL UTILITY
AUTHORITY.
14. THE CONTRACTOR SHALL NOT PERFORM ANY WORK UNTIL HE HAS OBTAINED COPIES OF ALL NECESSARY ENCROACHMENT AND CONSTRUCTION PERMITS.
15. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE LOCAL WATER AUTHORITY AND DETERMINING THE REQUIREMENTS AND PROCEDURES FOR
OBTAINING THE AUTHORITY'S APPROVAL OF THE WATER SYSTEM PRIOR TO SUBMITTING A PRICE TO THE OWNER. THE DETAILS AND SPECIFICATIONS OF THE
LOCAL WATER AUTHORITY SHALL GOVERN.
SANITARY SEWER LINES
1. ALL CONSTRUCTION SHALL BE PER THE LOCAL SEWER UTILITY'S REQUIREMENTS AND SPECIFICATIONS.
2. THE PLUMBER IS RESPONSIBLE FOR SETTING INVERT ELEVATIONS, PIPE SLOPES, ETC MEETING ALL LOCAL AND STATE CODES.
3. EACH JOINT SHALL BE CLEARLY AND LEGIBLY MARKED WITH THE MANUFACTURER'S NAME OR IDENTIFYING SYMBOL WITH THE LETTERS E.S. APPEARING ON
THE EXTERIOR OF THE PIPE NEAR THE SOCKET.
4. A MINIMUM OF 3 FEET OF COVER SHALL BE MAINTAINED OVER ALL PVC PIPE LINES.
5. WATER LINES SHALL BE INSTALLED AFTER ALL GRAVITY SEWER LINES ARE INSTALLED.
6. THIS CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UNDERGROUND UTILITIES BEFORE COMMENCING WORK. CONTACT WATER, TELEPHONE,
POWER AND GAS COMPANY BEFORE EXCAVATION IS BEGUN.
7. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SURVEY WORK NECESSARY TO STAKE SEWER LINES. THE CENTERLINE AND ALL CLEANOUT LOCATIONS
SHALL BE STAKED IN THE FIELD. THE OWNER'S SURVEYOR WILL SET ALL LOT CORNERS. THE CONTRACTOR SHALL PROTECT ALL PROPERTY MARKERS.
8. ALL UTILITY TRENCHES SHALL BE THOROUGHLY COMPACTED TO PREVENT SETTLEMENT AND DAMAGE TO FUTURE PAVEMENT AND STRUCTURES.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRS TO EXISTING ROADS USED BY HIS OPERATION. THE CONTRACTOR SHALL REMOVE MUD AND DEBRIS
FROM HIGHWAY AND NOT ALLOW DUST TO BECOME A NUISANCE OR SAFETY HAZARD.
10. ALL SANITARY SEWER WORK SHALL BE CONSTRUCTED TO LINES AND GRADES SHOWN AS DETAILED ON THE DRAWING. THE CONTRACTOR SHALL PROVIDE
STANDARD MANHOLES OR CLEAN-OUTS AT ALL BENDS AND CHANGES IN GRADE IN SEWER LINES AND CONNECTIONS TO EXISTING SEWER LINES. PIPE
BEDDING AND BACKFILL SHALL BE CAREFULLY CONTROLLED. ALL SANITARY SEWER WORK SHALL COMPLY WITH LOCAL CODES AN ORDINANCES. THE
ENGINEER, THE LOCAL AUTHORITY AND THE STATE HEALTH AUTHORITY MUST INSPECT ALL SEWER WORK AS REQUIRED BEFORE BEING PUT IN SERVICE.
11. ALL WORK SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND INSTRUCTIONS GIVEN BY THE OWNER'S
REPRESENTATIVE, THE STATE HEALTH AUTHORITY AND THE LOCAL GOVERNING AUTHORITY.
12. ALL SEWER LINES IN RELATION TO WATER LINES MUST CONFORM TO "TEN STATES STANDARDS", SECTION 38.3, 1990 EDITION, AT A MINIMUM. MAINTAIN A
MINIMUM OF 10' HORIZONTAL AND 2' VERTICAL SEPARATION BETWEEN THE WATER AND SANITARY SEWER LINES. WATER LINES SHALL CROSS OVER SANITARY
SEWER LINES.
13. CONTRACTOR TO ASSUME CLASS "B" BEDDING FOR SDR-26 PVC IN HIS BID PROPOSAL. CLASS "A" BEDDING WILL BE PAID FOR AS AN "EXTRA" SHOULD FIELD
CONDITIONS REQUIRE THIS BEDDING.
14. COUPLINGS SHALL BE EASTERN STANDARD SEWER REPAIR COUPLINGS AS MANUFACTURED BY MISSION RUBBER COMPANY, INC. CATALOG NO. 0408-807
(8640) 0410-704 (0636), OR 0412-6250 (2636), OR AS MANUFACTURED BY FERNCO JOINT SEALER CO., FERNDALE, MICHIGAN, OR APPROVED EQUAL.
15. SANITARY SEWER SERVICES SHALL BE INSTALLED PER DETAILS. LOCATION OF SERVICE LINES SHALL BE MEASURED FROM MANHOLES AND FURNISHED WITH
"AS-BUILT" DRAWINGS TO THE ENGINEER. EACH BUILDING SHALL HAVE (1) 6" OR 4" SERVICE LINE, AS SPECIFIED FOR ON THE DRAWINGS, BROUGHT TO WITHIN
5' OF THE BUILDING. SERVICE LINES SHALL BE INSTALLED AS REQUIRED ON PLANS. MINIMUM SLOPE AND CLEANOUT SPACING SHALL 1.04% FOR 6" AND 2.08%
FOR 4" SERIES.
16. ALL WATER AND SEWER LINE BACKFILL SHALL BE COMPACTED TO 95% STD. PROCTOR BY CONTRACTOR. THE OWNER SHALL TEST COMPACTION.
17. THE OWNER SHALL PAY ALL SEWER TAP FEES TO THE LOCAL GOVERNING AUTHORITY. THE CONTRACTOR SHALL COORDINATE WITH LOCAL AUTHORITY ON
SEWER TAPS.
18. THIS CONTRACTOR SHALL SHORE TRENCH EXCAVATION AND USE PIPE BOX TO COMPLY WITH ALL OSHA SAFETY REGULATIONS. IT IS THE CONTRACTORS
SOLE RESPONSIBILITY TO PROVIDE JOB SITE SAFETY AND COMPLY WITH ALL SAFETY REQUIREMENTS. THE CONTRACTOR IS RESPONSIBLE FOR HIS MEANS
AND METHODS OF CONSTRUCTION.
19. POLYVINYL CHLORIDE (PVC) 8" AND LARGER SHALL CONFORM TO ASTM D-3034, SDR-26, INSTALLED IN ACCORDANCE WITH ASTM D-2321. ELASTOMERIC JOINTS
SHALL COMPLY WITH ASTM D-3212. SDR-26 SHALL BE INSTALLED IN CLASS "B" BEDDING AS DETAILED ON THE DRAWINGS. PVC SEWER 6" AND SMALLER SHALL
CONFORM TO SCHEDULE 40.
20. DUCTILE IRON SHALL BE PRESSURE CLASS "350", CONFORMING TO AWWA C151, FURNISHED AND INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS.
JOINTS IN DIP AT THE CREEK CROSSING SHALL BE RESTRAINED FROM MOVEMENT (LOK-TIGHT OR APPROVED EQUAL).
21. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE LOCAL SEWER AUTHORITY AND DETERMINING THE REQUIREMENTS AND PROCEDURES FOR
OBTAINING THE AUTHORITY'S APPROVAL OF THE SEWER SYSTEM PRIOR TO SUBMITTING A PRICE TO THE OWNER. THE DETAILS AND SPECIFICATIONS OF THE
LOCAL SEWER AUTHORITY SHALL GOVERN.
22. MANHOLE FRAME AND COVER SHALL BE MF-11 AND MC-18 RESPECTIVELY AS MANUFACTURED BY SUMTER MACHINERY COMPANY OR SEWER AUTHORITY
APPROVED EQUAL. FRAME SHALL WEIGH 208 POUNDS AND COVER SHALL WEIGH 120 POUNDS. ALL SURFACES OF FRAME AND COVER SHALL BE BITUMINOUS
COATED.
23. STEPS SHALL BE COPOLYMER POLYPROPYLENE PLASTIC, REINFORCED WITH 1/2" GRADE 60 REINFORCEMENT OR SEWER DISTRICT APPROVED (IF ALLOWED
BY LOCAL AUTHORITY).
24. ALL SANITARY SEWER LINES SHALL BE AIR TESTED AND MUST CONFORM TO ASTM C828, LATEST REVISION.
25. ALL FLEXIBLE AND SEMI-RIGID PIPE SHALL BE TESTED BY PULLING A MANDREL, GO/NO GO, DEVICE BY HAND NO EARLIER THAN 30 DAYS AFTER THE
TRENCHING HAS BEEN COMPLETELY BACKFILLED. THE MAXIMUM ALLOWABLE DEFLECTION SHALL NOT EXCEED 5 PERCENT OF NOMINAL INSIDE DIAMETER.
26. CONTRACTOR SHALL NOT TIE NEW SEWER LINE TO EXISTING MANHOLE UNTIL ALL CONSTRUCTION IS APPROVED, TESTED AND ACCEPTED BY THE LOCAL
GOVERNING AUTHORITY.
27. A PRE-CONSTRUCTION CONFERENCE WITH THE CONTRACTOR, SEWER AUTHORITY, STATE HEALTH AUTHORITY, AND THE ENGINEER WILL BE HELD PRIOR TO
SEWER LINE CONSTRUCTION. CONTRACTOR SHALL SET UP PRE-CONSTRUCTION CONFERENCE WITH CITY.
28. THE CONTRACTOR SHALL GRASS ALL RIGHT-OF-WAY IN ACCORDANCE WITH SPECIFICATIONS FOR GRASSING.
29. ALL SEWER LINE WORK SHALL BE "APPROVED" BY THE STATE HEALTH AND LOCAL AUTHORITY, AND "APPROVED" AS-BUILT DRAWINGS SHALL BE FURNISH TO
THE OWNER BEFORE CONTRACTOR RECEIVES FINAL PAYMENT.
30. THE CONTRACTOR SHALL NOT PERFORM ANY WORK UNTIL HE HAS OBTAINED COPIES OF ALL NECESSARY ENCROACHMENT AND CONSTRUCTION PERMITS.
SCDES
1. IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO
HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE
SLOPE IS BROUGHT TO GRADE.
2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY
OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW.
WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS STABILIZATION MEASURES MUST BE
INITIATED AS SOON AS PRACTICABLE.
WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14
DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE.
3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION
INDICATES THAT A BMP HAS BEEN INAPPROPRIATELY, OR INCORRECTLY, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION
REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION.
4. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED
AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY
SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE
SEDIMENT BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE.
5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION
ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO
CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE
SITE IS STABILIZED.
6. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE
GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED.
7. RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUAL
PROPERTY OWNERS SHALL FOLLOW THESE PLANS DURING CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN IN ACCORDANCE WITH S.C REG.
72-300 ET SEQ. AND SCR100000.
8. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE
RUNOFF AND/OR TO DIVERT SEDIMENT-LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS.
9. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT
FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN’T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER
SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOS..
10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY
TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT
SOURCE IN STORM WATER DISCHARGES.
11. A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY
ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL
STABILIZATION IS REACHED.
12. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND-DISTURBING ACTIVITIES HAVE PERMANENTLY OR
TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS.
13. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL.
14. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS
MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE;
15. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH
APPROPRIATE BMPS (SEDIMENT BASIN, FILTER BAG, ETC.).
16. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED
WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL;
WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS;
FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND
SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING.
17. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE
CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE.
18. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR SC’S
WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATION
BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPS MUST BE IMPLEMENTED
AS SOON AS REASONABLY POSSIBLE.
19. A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATION
OF CONSTRUCTION ACTIVITIES. FOR NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE THIS CONFERENCE MUST BE HELD ON-SITE UNLESS THE
DEPARTMENT HAS APPROVED OTHERWISE.
MISCELLANEOUS
1. ALL RIP RAP FOR CHECK DAMS, EMERGENCY SPILLWAYS, AND OUTLET STABILIZATION PROTECTION TO BE UNDERLAIN WITH FILTER FABRIC. ALL RIP-RAP
SHALL BE DUMPED RIP-RAP IN ACCORDANCE WITH THE SOUTH CAROLINA STATE HIGHWAY DEPARTMENT STANDARD SPECIFICATIONS FOR HIGHWAY
CONSTRUCTION, LATEST EDITION. PIECES SHALL BE NO LARGER THAN 24 INCHES.
2. ASPHALT DESIGN SHALL BE DONE BY GEOTECHICAL ENGINEER. CONTRACTOR TO COORDINATE WITH OWNER FOR ASPHALT SPECIFICATION.
3. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS HIS REQUIRED FOR BORROW AREA (IF NEEDED).
4. ALL EROSION CONTROL FOR STOCKPILING OF DIRT SHALL COMPLY WITH SCDES STANDARDS.
5. SEDIMENT MUST BE REMOVED FROM SEDIMENT CONTROL DIKE WHEN SEDIMENT REACHES 50% OF THE SEDIMENT STORAGE VOLUME OR THE TOP OF THE
CLEAN-OUT STAKE, WHICHEVER IS LESS.
6. ALL SLOPES DRAINING OFF-SITE, (NOT THROUGH POND) TO BE GRASSED AND STABILIZED WITH EROSION CONTROL BLANKETS.
ABBREVIATIONS
±MORE OR LESS
ØDIAMETER
AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY TRANSPORTATION OFFICIALS
Ac.ACRE
ADAAMERICANS WITH DISABILITY ACT
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ASTM AMERICAN SOCIETY OF TESTING AND MATERIALS
AWWA AMERICAN WATER WORKS ASSOCIATION
BMBENCHMARK
BMPEROSION CONTROL BEST MANAGEMENT PRACTICES
BOW BOTTOM OF WALL
C&GCURB AND GUTTER
CBCATCH BASIN
CIPCAST IN PLACE
CLCENTERLINE
CYCUBIC YARD
DBHDIAMETER BREAST HEIGHT
DESDEPARTMENT OF ENVIRONMENTAL SERVICES
DIPDUCTILE IRON PIPE
EEAST
E.G.EXAMPLE GIVEN
ELELEVATION
ETCETCETERA
FDCFIRE DEPARTMENT CONNECTION
FFEFINISHED FLOOR ELEVATION
FHWA FEDERAL HIGHWAY ADMINISTRATION
FIRM FLOOD INSURANCE RATE MAP
FPEFINISHED PAD ELEVATION
FTFEET (LENGTH)
HHORIZONTAL
HDPE HIGH-DENSITY POLYETHYLENE
HPHIGH POINT
IBCINTERNATIONAL BUILDING CODE
IEINVERT ELEVATION
INVINVERT
LBSPOUNDS
LFLINEAR FEET (LENGTH)
LPLOW POINT
MAXMAXIMUM
MINMINIMUM
MPCE MATCH PRE-CONSTRUCTION ELEVATION
MS4s STORMWATER DISCHARGE FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMS
MUTCD MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
NNORTH
NENORTHEAST
NO.NUMBER
NSFNATIONAL SANITATION FOUNDATION
NTSNOT TO SCALE
NWNORTHWEST
OCON CENTER
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
PCPRECAST
PVCPOLYVINYLCHLORIDE
RRADIUS
RCPREINFORCED CONCRETE PIPE
R/WRIGHT OF WAY
PSFPOUNDS PER SQUARE FOOT (PRESSURE)
PSIPOUNDS PER SQUARE INCH (PRESSURE)
PSIGPOUNDS PER SQUARE INCH GUAGE
SSOUTH
SCDES SOUTH CAROLINA DEPARTMENT OF ENVIRONMENTAL SERVICES
SCDOT SOUTH CAROLINA DEPARTMENT OF TRANSPORATION
SESOUTHEAST
SFSQUARE FEET
STASTATION
STD. STANDARD
SWSOUTHWEST
TCTOP OF CURB
TPTOP OF PAVEMENT
TOW TOP OF WALL
TYPTYPICAL
VVERTICAL
VCPVITRIFIED CLAY PIPE
WWEST
WWF WELDED WIRE FABRIC
THERE MAY BE ADDITIONAL ABBREVIATIONS USED IN THESE PLANS. PLEASE CONTACT ENGINEER IF ANY ABBREVIATION IS UNDEFINED OR
UNCLEAR.
OVERHEAD CABLE XOC
LEGEND
G XGGAS
OC
DIVERSION BERMDB
DIVERSION DITCHDD
OVERHEAD ELECTRIC XOEOE
OVERHEAD TELEPHONE XOTOT
PERMANENT DIVERSION DITCHPD
ROOF DRAIN RD
RSFREINFORCED SILT FENCE
STORM DRAINAGE XDSD
SANITARY SEWER XSSS
SSDSUBSURFACE DRAIN
TEMPORARY DIVERSION DITCHTD
TREE PROTECTIONTP
C XCUNDERGROUND COMMUNICATION
E XEUNDERGROUND ELECTRIC
W XWWATER
FIRE SERVICE FW
X XXFENCE
THERE MAY BE ADDITIONAL SYMBOLS USED IN THESE PLANS. PLEASE CONTACT ENGINEER IF ANY SYMBOL IS
UNDEFINED OR UNCLEAR.
EXISTINGPROPOSEDDESCRIPTION
FIRE HYDRANT
SEWER CLEANOUT
ELECTRICAL BOX
UTILITY POLE
WATER VALVE
LIGHT POLE
WATER METER
CABLE BOX
TELEPHONE BOX
BENCHMARK
POST INDICATOR VALVE
IRON PIN
SIGN
REDUCER
TELEPHONE MANHOLE
ELECTRICAL MANHOLE
PARKING COUNT
FIRE DEPARTMENT CONNECTION
ASPHALT PAVEMENT
(LIGHT DUTY)
CONCRETE PAVEMENT
BRICK PAVEMENT OR HARDSCAPE
WETLANDS
PROPERTY BOUNDARY
ADJACENT/INTERNAL PROPERTY LINES
BUFFER
WETLANDS
CENTERLINE
GRAVEL PAVEMENT
LIMITS OF DISTURBANCE
UTILITY LINE, PIPE, OR CURB TO BE DEMOLISHED
ASPHALT PAVEMENT
(HEAVY DUTY)
SANITARY SEWER MANHOLE
STORM DRAINAGE - CATCH BASIN TYPE 16
STORM DRAINAGE - CATCH BASIN TYPE 9
STORM DRAINAGE - CURB INLET TYPE 1
STORM DRAINAGE - DROP INLET
STORM DRAINAGE - JUNCTION BOX
INLET PROTECTION TYPE A
INLET PROTECTION TYPE F
INLET PROTECTION TYPE E
ROCK OUTLET STABILIZATION
ROCK SEDIMENT DIKE
STORM DRAINAGE - MISCELLANEOUS
TREE - TO BE REMOVED
TREE
EASEMENT
SETBACK
ENTITY TO BE DEMOLISHED
HOSE PULL HP
ROCK CHECK DAM
SILTSACK INLET PROTECTION
CONCRETE WASHOUT
SILT FENCE SF
TREE - TO BE RELOCATED
PARKING ISLAND
GUTTER EEL INLET PROTECTION
TREE PROTECTION BARRICADETB
or
or
or
or
or
TURBIDITY BARRIER
86
+1227/256#6+10
XDXDXDXDXDXDXD XD XD XD
XDXDXDXDXDXDXDXDXDXDXDXDXD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD XD XD XD XD XD XD XD XD XD XD XD
XS
XS
XS
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW
XW
XW
XW
XW
XW XW XW XW XW XW XW XW XW XW XW XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE XE XE XE XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE
XE
XE
XE
XE
XE
XE
XE
XE
XE XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE XE XE XE XE XE XE XE XE XE XE XE XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XEXEXEXEXEXE
XE
XE
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XSXSXSXSXSXSXSXSXSXSXSXSXSXSXS
XDXDXDXDXDXDXDXDXDXD
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XCXCXCXCXCXCXC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XCXC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XXXXXXXXXXX
X
X
X
X
XX
X
X
XXXXXXXXX
X X X X X X X X
X X X X X X X X X X X
X
X
X
X X X X X X X X X X X X X
ADA ACCESSIBLE PATH
PLOT DATE: 8/25/2026 1:09:33 PM FILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0025 THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING.
53
27.9
Max 68.5° Horiz
Max 10° Vert
43.5 4 2.5
23.5
4 17.4 4.2
WB-67 - Interstate Semi-Trailer
Overall Length 73.501ft
Overall Width 8.500ft
Overall Body Height 13.500ft
Min Body Ground Clearance 1.334ft
Max Track Width 8.500ft
Lock-to-lock time 6.00s
Max Steering Angle (Virtual) 28.40°
VEHICLE TRACKING SPECIFICATIONS
SAFETY NOTE TO CONTRACTOR
THE CONTRACTOR SHALL SHORE TRENCH EXCAVATION AND USE
PIPE BOX TO COMPLY WITH ALL OSHA SAFETY REGULATIONS. IT IS
THE CONTRACTOR'S SOLE RESPONSIBILITY TO PROVIDE JOB SITE
SAFETY AND COMPLY WITH ALL SAFETY REQUIREMENTS. THE
CONTRACTOR IS RESPONSIBLE FOR HIS MEANS AND METHODS OF
CONSTRUCTION.
UTILITY NOTE TO CONTRACTOR
THE UTILITIES SHOWN ARE FOR THE CONTRACTOR'S
CONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOT
SHOWN ON THESE PLANS. THE ENGINEER ASSUMES NO
RESPONSIBILITY FOR THE LOCATIONS SHOWN AND IT SHALL BE
THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATIONS
OF ALL UTILITIES WITHIN THE LIMITS OF THE WORK. ALL DAMAGE
MADE TO EXISTING UTILITIES BY THE CONTRACTOR SHALL BE THE
SOLE RESPONSIBILITY OF THE CONTRACTOR.
SITE DATA TABLE
TAX MAP INFORMATION
SUBJECT PARCEL(S) ZONING GENERAL COMMERCIAL DISTRICT (GC1)
SUBJECT PARCEL(S) AREA
BUILDING AREA - PROPOSED
BUILDING SETBACK
REQUIREMENTS
SITE BUFFER
REQUIREMENTS
15' BUFFER YARD ABUTTING RESIDENTIAL PROPERTY
BUILDING HEIGHT LIMITS
FLOOD ZONE INFORMATION
(PROVIDED BY OTHERS)
PROJECT SITE APPEARS TO BE LOCATED IN FLOOD ZONE "AE
(11 & 12)" AS SCALED FROM FIRM COMMUNITY PANEL NUMBER
455416 AND MAP NUMBER 45019C0542K DATED JANUARY 29,
2021. THE DEPICTION OF THE FLOOD ZONE WITHIN THIS SET
OF PLANS SHALL NOT BE USED AS THE BASIS FOR FLOOD
ZONE DETERMINATION OR FLOOD ZONE RELATED ISSUES.
XDXDXDXDXDXDXD XD XD XD
XDXDXDXDXDXDXDXDXDXDXDXDXD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD XD XD XD XD XD XD XD XD XD XD XD
XS
XS
XS
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW
XW
XW
XW
XW
XW XW XW XW XW XW XW XW XW XW XW XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE XE XE XE XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE
XE
XE
XE
XE
XE
XE
XE
XE
XE XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE XE XE XE XE XE XE XE XE XE XE XE XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XEXEXEXEXEXE
XE
XE
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XSXSXSXSXSXSXSXSXSXSXSXSXSXSXS
XDXDXDXDXDXDXDXDXDXD
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XCXCXCXCXCXCXC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XCXC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF
SF
SF
SF
SF
SF
SF SF SF SF
SF
SF
SF
SF
SF
SF
SF SF SF SF SF SF SF SF SF SF SF SF SF
SF
PLOT DATE: 8/25/2026 1:09:56 PM FILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0031 THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING.
SAFETY NOTE TO CONTRACTOR
THE CONTRACTOR SHALL SHORE TRENCH EXCAVATION AND USE
PIPE BOX TO COMPLY WITH ALL OSHA SAFETY REGULATIONS. IT IS
THE CONTRACTOR'S SOLE RESPONSIBILITY TO PROVIDE JOB SITE
SAFETY AND COMPLY WITH ALL SAFETY REQUIREMENTS. THE
CONTRACTOR IS RESPONSIBLE FOR HIS MEANS AND METHODS OF
CONSTRUCTION.
UTILITY NOTE TO CONTRACTOR
THE UTILITIES SHOWN ARE FOR THE CONTRACTOR'S
CONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOT
SHOWN ON THESE PLANS. THE ENGINEER ASSUMES NO
RESPONSIBILITY FOR THE LOCATIONS SHOWN AND IT SHALL BE
THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATIONS
OF ALL UTILITIES WITHIN THE LIMITS OF THE WORK. ALL DAMAGE
MADE TO EXISTING UTILITIES BY THE CONTRACTOR SHALL BE THE
SOLE RESPONSIBILITY OF THE CONTRACTOR.
XDXDXDXDXDXDXD XD XD XD
XDXDXDXDXDXDXDXDXDXDXDXDXD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD XD XD XD XD XD XD XD XD XD XD XD
XS
XS
XS
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW
XW
XW
XW
XW
XW XW XW XW XW XW XW XW XW XW XW XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE XE XE XE XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE
XE
XE
XE
XE
XE
XE
XE
XE
XE XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE XE XE XE XE XE XE XE XE XE XE XE XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XEXEXEXEXEXE
XE
XE
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XSXSXSXSXSXSXSXSXSXSXSXSXSXSXS
XDXDXDXDXDXDXDXDXDXD
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XCXCXCXCXCXCXC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XCXC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XXXXXXXXXXX
X
X
X
X
XX
X
X
XXXXXXXXX
X X X X X X X X
X X X X X X X X X X X
X
X
X
X X X X X X X X X X X X X
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF
SF
SF
SF
SF
SF
SF SF SF SF
SF
SF
SF
SF
SF
SF
SF SF SF SF SF SF SF SF SF SF SF SF SF
SF
PLOT DATE: 8/25/2026 1:10:18 PM FILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0032 THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING.
SAFETY NOTE TO CONTRACTOR
THE CONTRACTOR SHALL SHORE TRENCH EXCAVATION AND USE
PIPE BOX TO COMPLY WITH ALL OSHA SAFETY REGULATIONS. IT IS
THE CONTRACTOR'S SOLE RESPONSIBILITY TO PROVIDE JOB SITE
SAFETY AND COMPLY WITH ALL SAFETY REQUIREMENTS. THE
CONTRACTOR IS RESPONSIBLE FOR HIS MEANS AND METHODS OF
CONSTRUCTION.
UTILITY NOTE TO CONTRACTOR
THE UTILITIES SHOWN ARE FOR THE CONTRACTOR'S
CONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOT
SHOWN ON THESE PLANS. THE ENGINEER ASSUMES NO
RESPONSIBILITY FOR THE LOCATIONS SHOWN AND IT SHALL BE
THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATIONS
OF ALL UTILITIES WITHIN THE LIMITS OF THE WORK. ALL DAMAGE
MADE TO EXISTING UTILITIES BY THE CONTRACTOR SHALL BE THE
SOLE RESPONSIBILITY OF THE CONTRACTOR.
XDXDXDXDXDXDXD XD XD XD
XDXDXDXDXDXDXDXDXDXDXDXDXD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD
XD XD XD XD XD XD XD XD XD XD XD XD
XS
XS
XS
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW XW
XW
XW
XW
XW
XW XW XW XW XW XW XW XW XW XW XW XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XW
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE XE XE XE XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE XE
XE
XE
XE
XE
XE
XE
XE
XE
XE XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE XE XE XE XE XE XE XE XE XE XE XE XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XE
XEXEXEXEXEXE
XE
XE
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XS
XSXSXSXSXSXSXSXSXSXSXSXSXSXSXS
XDXDXDXDXDXDXDXDXDXD
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XCXCXCXCXCXCXC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XCXC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XC
XXXXXXXXXXX
X
X
X
X
XX
X
X
XXXXXXXXX
X X X X X X X X
X X X X X X X X X X X
X
X
X
X X X X X X X X X X X X X
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF
SF
SF
SF
SF
SF
SF SF SF SF
SF
SF
SF
SF
SF
SF
SF SF SF SF SF SF SF SF SF SF SF SF SF
SF
PLOT DATE: 8/25/2026 1:10:37 PM FILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0033 THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING.
SAFETY NOTE TO CONTRACTOR
THE CONTRACTOR SHALL SHORE TRENCH EXCAVATION AND USE
PIPE BOX TO COMPLY WITH ALL OSHA SAFETY REGULATIONS. IT IS
THE CONTRACTOR'S SOLE RESPONSIBILITY TO PROVIDE JOB SITE
SAFETY AND COMPLY WITH ALL SAFETY REQUIREMENTS. THE
CONTRACTOR IS RESPONSIBLE FOR HIS MEANS AND METHODS OF
CONSTRUCTION.
UTILITY NOTE TO CONTRACTOR
THE UTILITIES SHOWN ARE FOR THE CONTRACTOR'S
CONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOT
SHOWN ON THESE PLANS. THE ENGINEER ASSUMES NO
RESPONSIBILITY FOR THE LOCATIONS SHOWN AND IT SHALL BE
THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATIONS
OF ALL UTILITIES WITHIN THE LIMITS OF THE WORK. ALL DAMAGE
MADE TO EXISTING UTILITIES BY THE CONTRACTOR SHALL BE THE
SOLE RESPONSIBILITY OF THE CONTRACTOR.
NO UTILITY IMPROVEMENTS PROPOSED
PLOT DATE: 8/25/2026 1:10:46 PM FILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0034 THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING.
CONSTRUCTION ENTRANCE
South Carolina Department of
Health and Environmental Control
SIZESPECIFICATION
PLAN SYMBOL
DATE
South Carolina Department of
Health and Environmental Control
CONSTRUCTION ENTRANCE
DATE
FLAT-BOTTOM TRENCH DETAIL
V-SHAPED TRENCH DETAIL
SILT FENCE INSTALLATION
South Carolina Department of
Health and Environmental Control
PLAN SYMBOL
DATE
STANDARD DRAWING NO.
South Carolina Department of
Health and Environmental Control
DATE
PLOT DATE: 8/25/2026 1:10:48 PM FILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0034 THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING.
TYPICAL PARKING SPACE DETAIL
NOT TO SCALE
TYPICAL ADA PARKING STRIPING DETAIL
NOT TO SCALE
INTERNATIONAL ADA SYMBOL DETAIL
NOT TO SCALE
ADA PARKING SIGN DETAIL
NOT TO SCALE
DO NOT ENTER SIGN DETAIL
NOT TO SCALE
ENTER
DO NOT
CHAIN LINK FENCE AND GATE DETAIL
NOT TO SCALE
CONCRETE SIDEWALK DETAIL
NOT TO SCALE
SECTION A SECTION B TYPICAL THICKENED EDGE AT PARKING LOT
PLOT DATE: 8/25/2026 1:10:49 PM FILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0034
C L I N EE N G I N E E R I N G
THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING.
REV. DATE DRAWN APPV.DESCRIPTION
SHEET NUMBER
PROJECT MANAGER
DRAWN BY
PROJECT DATE
JOB NUMBER
PROFESSIONAL DESIGN CONSULTING
80 41ST AVENUE
ISLE OF PALMS, SOUTH CAROLINA
IOP MASTER PLAN
22047
AUGUST 2022
AJ/JR
MDC
A 07/29/2026 ISSUED FOR REVIEW AND APPROVAL -- MDC
B 08/24/2026 ISSUED FOR REVIEW AND APPROVAL -- MDC
C-7
CONSTRUCTION DETAILS