RecordWell Data

Agenda

City of Isle of Palms · Charleston County · Agenda packets

Open the original document More from City of Isle of Palms

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Public Ser vices & Facilities Committee 9:00 a.m., Tuesday, August 4, 2026 1207 Palm Boulevard City Hall Council Chambers Public Comm ent: Citizens who wish to speak during the meeting must email their first and last name, address and topic to Nicole DeNeane, City Clerk, at nicoled@isleofpalms.gov no later than 3:00 p.m. the day before the meeting. Citizens may also provide written public comment here: https://www.isleofpalms.gov/public-comment-form Agenda 1. Call to order and acknowledgment that the press and the public have been duly notified of the meeting in accordance with the Freedom of Information Act. 2. Citizens’ Comments – All comments have a time limit of three (3) minutes. 3. Approval of previous meeting’s minutes – July 7, 2026 4. Marina Tenants’ Comments 5. Departmental Reports (p. 9 ) 6. Old Business a. Update and discussion of Waterway Boulevard project b. Update and discussion of beach projects (p. 13 ) c. Update and discussion of marina parking lot reconfiguration (p. 15 ) d. Update and discussion of marina dredging project work schedule e. Update on potential beach volleyball court f. Update on IT Costs g. Discussion of amending trash collection policies as they relate to commercial operations (p. 27) 7. New Business a. Discussion and consideration of purchase of Public Works Automated Side Loader (FY 27, Hospitality Fund, $435K budgeted) (p. 33 ) b. Discussion of trash at the marina 8. Miscellaneous Business- next meeting: Tuesday, September 1, 2026 at 9am 9. Adjournment P ublic Services & Facilities Committee Meeting 9:00am, Tuesday, July 7, 2026 1207 Palm Boulevard, Isle of Palms, SC and broadcasted live on YouTube: https://www.youtube.com/user/cityofisleofpalms MINUTES 1. Call to Order Present: Council members Miars , Streetman and Pierce Staff Present: Administrator Kerr, Deputy Administrator Kuester, Director Asero, Director Ferrell 2. Citizen’s Comments Brenda Rosenthal spoke with concern about the use of e-bikes on the Waterway Boulevard path. She said that according to national standards, the Waterway Boulevard path is not wide enough to qualify as a multi-use path. She would like to see the City enact an ordinance similar to Wild Dunes that restricts the use of e-bikes on paths. Kevin Martz spoke about the use of the 28th Avenue cul-de-sac during basketball camp. His comments are attached to these minutes. 3. Approval of Previous Meeting’s Minutes – June 2, 2026 MOTION: Council Member Miars made a motion to approve the minutes. Council Member Pierce seconded the motion. The motion passed unanimously. 4. Marina Tenant’s Comments – none 5. Departmental Reports 6. Old Business A. Update and discussion of Waterway Boulevard project Administrator Kerr said the change order with The Bastion Group has been executed. Staff continues to review the need for or elimination of sod and prepare an inventory of driveways needing repair. Council Member Pierce noted some breakage on outer edges of new asphalt in areas adjacent to a drop-off. Administrator Kerr will look into the matter. The Committee briefly discussed Ms. Rosenthal’s concern about the use of e-bikes on the path. Administrator Kerr noted that the intent of the project was not to change the use of the path, but Public Services & Facilities Committee, 7/7/2026 2 to improve it. He added that the Public Safety Committee has approved the placement of signs indicating “No Motorized Vehicles” along the path when it is completed. However, he points out that Chief Cornett is limited by State law on how much he can enforce the e-bikes on the path. The project is currently due to be completed in mid-September. B. Update and discussion of beach projects Administrator Kerr said equipment for the renourishment project begins arriving today. City staff meets weekly with CS&E, Marinex, and Wild Dunes. He said that BCM has concerns with some of the private beach walkovers that come out further than they should and or are wider than permitted. There are remnants of a pool that also need to be removed. Video showing some cleanup of the mudballs on the south end was shared. C. Update and discussion of marina parking lot reconfiguration Administrator Kerr said Matt Cline has been engaged, and he attended a kickoff meeting with the restaurant tenants. Mr. Cline has expressed concern about the budgeted amount for the project, believing it to be too low. D. Update on Marina dredging project work schedule Administrator Kerr reported that the new bathometric surveys show more sediment around the T- dock needs to be removed than originally thought. ATM is working with USACE on the best permitting path forward. USACE is suggesting no change to the permit but making an adjustment at the end of the project. Administrator Kerr said he met with the 26the Avenue Canal Association who believe they may be ready to begin work on their portion of the project about the same time as the City plans to mobilize. If that happens, it may be possible to share in mobilization costs. E. Update on IT Costs Deputy Administrator Kuester described the staff’s internal review process related to IT expenses. Current savings are approximately $9,000. Staff will continue to look for areas to prune or consolidate IT services. Council Member Pierce stated he would like to look at the vendor view as it would include IT costs and expenditures that might appear elsewhere in the budget. He believes more savings can be found. He added that it might be helpful to bring in someone temporarily to look at all of the City’s IT-related expenses. Public Services & Facilities Committee, 7/7/2026 3 7. N ew Business A. Discussion of location and costs of potential beach volleyball court Director Ferrell said the costs for a beach volleyball court range from $45,000-$60,000. She is still looking into a space for the court. B. Consideration of bid trimming for palm trees - $31,200, Planet Green Tree Service Director Asero said trimming of the palm trees is necessary to capture the fruits that cause a mess on vehicles as well as the dead fronds. He said the City’s arborist reviewed the trees to be trimmed and said this is the time of year to trim. He added that the new palm trees in the municipal lot will not need trimming for two years. Administrator Kerr said that this is the annual cost of a 3-year contract that is paid out of the City’s tree fund. C. Discussion of the use of 28th Avenue cul-de-sac by Recreation Center visitors Director Ferrell explained how the cul-de-sac at 28th Avenue is used as a safe drop-off and pickup spot for the annual basketball camp. She said drop-off at the front entrance is possible, but it makes parking difficult for the exercise classes beginning at the same time. After discussion of options, the Committee members asked Director Ferrell to not advertise the spot as a pickup and drop-off location. D. Discussion of amending trash collection policies as they relate to commercial operations Director Asero said he has reviewed the history of ordinances related to solid waste collection. He is preparing an updated ordinance for the committee to review next month. 8. Miscellaneous Business The next regular meeting of the Public Services & Facilities Committee will be Tuesday, August 4, 2026 at 9am. 9. Adjournment Council Member Miars made a motion to adjourn and Council Member Streetman seconded the motion. The meeting was adjourned at 10:24am. Respectfully submitted, Nicole DeNeane City Clerk Monthly Report July 2026 Isle of Palms Recreation Department Programs, Group Fitness, Athletics & Special Events Adult Classes: Fitness Classes and Programs with top participation: Core & More (15), Strength (16), Tabata (24), Move-It (19), Stability & Strength (15), RXFit Club (14), Suspension Training (11), and Morning Yoga (16) Beach Yoga: Tuesdays at 7:30am through October - 25th Ave Beach Access. Approximately 20 people per week. 4th of July Home Decorating Contest: All American Spirit - 1 Place IOP Marina & 2 Place - IOP Beach Chair Co. Most Patriotic - 1 Place Daniella Charles & 2 Place Jackie Malan and Most Traditional - 1 Place Marcie Thompson & 2 Place Bonnie Criswell. Participants had the month of June to register and decorate, judging took place June 30 and winners were announced via social media on July 1. st nd st nd st nd Youth Soccer: registration opened July 7 and closes August 14 - currently 95 youth are registered. Adult Athletics: Table Tennis, 6v6 Soccer, and 3on3 Basketball - registration opened July 7 and closes August 14. Sea Stroll & Learn: Thursday, July 9 - Mary Pringle & Island Turtle Team, 58 people participated in the walk. Tennis Camp Red/Orange Ball: July 13 - 16, 6 youth participated in camp. Farmers Market, Food Truck Jam & Outdoor Movie “Matilda” will be held on Thursday, July 16. 46 vendors participated in the market and over 200 people stayed to watch the outdoor movie. IOP Beach Run: Saturday, July 25 - Front Beach Isle of Palms, 390 people preregistered and a total of 452 Soccer Camp: July 27 - 31, 25 youth participated in the soccer camp. Operations Tennis Court reconstruction started Tuesday, May 26, grading and asphalt complete, fence installed and the surfacing and striping is scheduled for 1 week of August.st Meeting with vendors for quotes on exterior lighting upgrades at the Recreation Center. Activity Guide Fall 2026: finalizing schedules, classes, events and programs for fall programming scheduled to be released 1 week of August online and hard copies by the 2 week of August. st nd SCRPA Southern District Workshop: Thursday, July 30 at 10am at Alhambra Hall. Special Elections: August 11 and August 25 runoff, if needed. IOP Connector Run: monthly meetings with board for preparations and planning of the 5K & 10K Run on October 3. Maintenance & Repairs Upcoming Programs, Events & New Offerings Get your Spike On Volleyball Camp: August 3 - 6 from 9am - 11am, currently 15 youth are registered. Gymnastics Camp: August 3 - 5 from 10:30am - Noon, currently 15 youth are registered. Trading Card Lab: August 4, 5 & 6 from 3:15 - 5:15pm, Ages 7-11. Create your own card game. Around the World: Aug 7 - Sept 18 from 3-4pm, ages 5-9 will virtually travel the world and discover cultures and traditions. 28 Annual Half Rubber Tournament: Saturday, August 8 at 8am, currently 4 teams are registered. th Tiny Chefs: Aug. 10 - Sept. 14 at 3pm, 3 and 4 year olds will assemble no bake snack options, taste, share & clean. Speaker Series: Narcan Training for youth and families: Monday, August 10 at 6pm & Move Better, Live Better, Simple Strategies to stay strong & Active: Tuesday, August 11 at 5:30pm. Sea Stroll & Learn: Thursday, August 13, Seafoam, Algae, Fleas and other Curiosities 25 Ave Beach Access - Free 3th AI Workshop: Tuesday, August 18 from 10am - Noon. Farmers Market, Food Truck Jam will be held on Thursday, August 20 from 4pm -7pm Marsh paint-along workshop: Saturday, August 22 at 11am Coffee with the Mayor: Friday, August 28 at 9am Ice machine: met with AVIV for diagnostics. Recreation members cleaned and replaced sensors in machine. Soccer Field: replaced irrigation heads, replaced and remounted irrigation control box. Daily blowing, trash pickup, mow, trim & edge. Treated for Mole Crickets. Basketball, Pickleball, Fitness Court: daily blowing, cleaning, trash pickup, trim and edge. Repaired fitness court tiles. Cleaning and prepping island curb to be painted safety yellow. Replaced broken parking stop in parking lot. Met with Bastion Group for pricing on sidewalk repairs and other concrete work. Met with Possums for site survey and soil samples for turf fields. Back of building and Dog Park clean up: mow, leaf clean up, trash pickup, grading and level around fence. Equipment: replaced blades on push mower and zero turn. Enrollment Report July 2026 Monthly Revenues 2026 Annual Comparison RecTrac WebTrac Total January February March April May June July August September October November December 0 10000 20000 30000 40000 50000 60000 70000 2023 2024 2025 2026 January February March April May June July August September October November December 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 Participants registering for classes during the month from July 1 - July 30 RecTrac: in-house registration vs. WebTrac: online Registrations. Total registrations for July: 444 Revenue sales brought in by programs, athletics and events. RecTrac: in-house vs WebTrac: online Total Revenue for July: $21,148 Year to Year RecTrac WebTrac RecTrac 70% WebTrac 30% 2025 2026 January February March April May June July August September October November December 0 2 4 6 8 10 12 14 2025 2026 January February March April May June July August September October November December 0 5 10 15 20 Cardio Room Daily Average Visits Open Gym Daily Average Visits Participants utilizing the gymnasium for open play Participants utilizing the cardio room Upcoming Events: Farmers Market 3rd Thursday July - October 4pm - 7pm Food Truck Jam, Arts & Crafts Vendors, Live Music & More B e a c h Yo g aBeach YogaB e a c h Yo g a Tuesdays | August - October 7:30am | 25 Ave th Free Thursday, August 13 7:30am 25 Ave. Beach Accessth REGISTER TODAY! ADULT SPORTS 1. Project on schedule – always subject to change 2. Daily cubic yard projection w/in initial estimates: ~25-30K cy per day 3. Back fence issue 4. Sandbags 5. Removal of derelict structures to comply with BCM Photo taken at high tide 31 JUL Active construction zone Limit of fencing Foot traffic Available beach at high tide is compressing Alternate foot traffic paths will be required PLOT DATE: 7/29/2026 10:53:46 AMFILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0027 C L I N EE N G I N E E R I N G THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING. REV.DATEDRAWNAPPV.DESCRIPTION SHEET NUMBERPROJECT MANAGERDRAWN BYPROJECT DATEJOB NUMBER PROFESSIONAL DESIGN CONSULTING50 41ST AVENUEISLE OF PALMS, SOUTH CAROLINAIOP MASTER PLAN 22047AUGUST 2022AJ/JRMDC A07/29/2026ISSUED FOR REVIEW AND APPROVAL--MDC G-1COVER site development plansfor50 41ST AVENUEISLE OF PALMS, south carolinaIOP MASTER PLAN VICINITY MAPSCALE 1" = 1000' PROJECTLOCATION ADA COMPLIANCETHE PUBLIC RIGHT-OF-WAY MUST REMAIN ADA COMPLIANT DURINGCONSTRUCTION OR AN ALTERNATIVE ROUTE MUST BE PROVIDED. ITIS THE OWNERS RESPONSIBILITY TO REPAIR ALL DAMAGEDSIDEWALKS TO REINSTATE AN ADA ACCESSIBLE ROUTE.PROJECT DESCRIPTIONSITE IMPROVEMENTS WILL CONSIST OF THE REDEVELOPMENT OFPARKING LOT AND DRIVEWAYS. SITE CONTACTSCLIENTCIVIL ENGINEERMATTHEW CLINE, P.E.CLINE ENGINEERINGP.O. BOX 21204CHARLESTON, SC 29413PHONE (843) 991-7239PROJECT SURVEYORCITY OF ISLE OF PALMSDOUGLAS KERRPO DRAWER 508ISLE OF PALMS, SC 29451PHONE (843) 886-6428SOUTH CAROLINA EROSION CONTROLS.C.D.E.S. B.C.M.STORMWATER DIVISION1362 MCMILLAN AVE. SUITE 400CHARLESTON, SC 29405PHONE (843) 953-0200SOUTH CAROLINA DEPARTMENT OFTRANSPORTATION DISTRICT 66355 FAIN BLVD.NORTH CHARLESTON, SC 29406PHONE (843) 740-1667SHEET LIST TABLESHEET NUMBERSHEET TITLEG-1COVERG-2GENERAL NOTESG-3GENERAL NOTESV-1SITE CONDITIONSC-1SITE PLANC-2DEMOLITION AND SWPPPC-3GRADING AND DRAINAGE PLANC-4UTILITY PLANC-5CONSTRUCTION DETAILSC-6CONSTRUCTION DETAILSC-7CONSTRUCTION DETAILS PLOT DATE: 7/29/2026 10:53:53 AMFILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0028 C L I N EE N G I N E E R I N G THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING. REV.DATEDRAWNAPPV.DESCRIPTION SHEET NUMBERPROJECT MANAGERDRAWN BYPROJECT DATEJOB NUMBER PROFESSIONAL DESIGN CONSULTING50 41ST AVENUEISLE OF PALMS, SOUTH CAROLINAIOP MASTER PLAN 22047AUGUST 2022AJ/JRMDC A07/29/2026ISSUED FOR REVIEW AND APPROVAL--MDC G-2GENERAL NOTES SITEWORK1.TOPOGRAPHIC AND BOUNDARY SURVEY BY OTHERS AND PROVIDED TO CLINE ENGINEERING BY CLIENT.2.THE CONTRACTOR SHALL VERIFY THE LOCATION AND INVERT ELEVATION OF ALL UNDERGROUND UTILITIES, AND VERIFY PROPERTY CORNERS ANDTOPOGRAPHY BEFORE ANY CONSTRUCTION IS BEGUN. CALL UTILITY COMPANIES BEFORE EXCAVATION TO LOCATE ALL BURIED CABLES AND UNDERGROUNDUTILITIES. PRIOR TO INSTALLATION OF STORM OR SANITARY SEWER, THE CONTRACTOR SHALL VERIFY THE INVERTS OF EXISTING STRUCTURES AND INFORMTHE OWNER AND THE ENGINEER OF ANY CONFLICTS PRIOR TO CONSTRUCTION.3.THE CONTRACTOR SHOULD NOTIFY THE ENGINEERS FOR A REVIEW SHOULD DISCREPANCIES BE DISCOVERED AT THE SITE OR ON THE DRAWINGS BEFOREAND DURING CONSTRUCTION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE BETWEEN ALL CIVIL DRAWINGS WITH GRADING AND UTILITYCONTRACTORS IN ORDER TO AVOID PROBLEMS DURING CONSTRUCTION.4.CONTRACTOR TO SCHEDULE A PRECONSTRUCTION MEETING WITH ALL UTILITY COMPANIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY THEENGINEER AND UTILITY COMPANIES DURING CONSTRUCTION OF WATER AND SEWER SO PERIODIC OBSERVATIONS CAN BE MADE. CONTRACTOR WILLCERTIFY TO THE ENGINEER IN WRITING THAT WATER AND SEWER LINES HAVE BEEN TESTED AND CONSTRUCTED ACCORDING TO THE ENGINEER'S ANDUTILITY COMPANY'S DRAWINGS AND SPECIFICATIONS.5.EXISTING DRAINAGE STRUCTURES TO BE INSPECTED AND REPAIRED AS NEEDED AND EXISTING PIPES TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS.6.ALL REFERENCE TO SPECIFICATIONS FOR HIGHWAY CONSTRUCTION OR MATERIALS ARE MADE FROM SOUTH CAROLINA STATE HIGHWAY DEPARTMENT'SSTANDARD SPECIFICATION, LATEST EDITION.7.ALL DIMENSIONS SHOWN ARE MEASURED FROM OUTSIDE FACE OF BUILDING WALL AND TO FACE OF CURB LINE. MIDDLE LINE IS THE FACE OF CURB.8.EARTHWORK SHALL BE TO THE LINES AND GRADES SHOWN. PROOF ROLLING AND COMPACTION TEST SHALL BE ACCOMPLISHED IN THE FIELD TO TEST ALLAREAS. THE OWNER SHALL RETAIN THE SERVICES OF A TESTING COMPANY TO TEST ALL AREAS. MASS AREAS OF FILL SHALL BE PLACED IN LOOSELYMEASURED LIFTS NOT EXCEEDING 8" THICKNESS. ISOLATED AREAS OF FILL (SUCH AS TRENCH BACKFILL) SHALL BE PLACED IN LIFTS NOT EXCEEDING 6"THICKNESS.9.CONTRACTOR SHALL PROTECT ALL TREES THAT ARE TO REMAIN AS MARKED IN THE FIELD BY OWNER'S REPRESENTATIVE.10.THE GRADING CONTRACTOR SHALL PROOF-ROLL THE CONSTRUCTION AREA WITH A FULLY-LOADED TANDEM-AXLE DUMP TRUCK, OR APPROVED EQUAL, BYMAKING 2 COMPLETE PASSES IN EACH OF 2 PERPENDICULAR DIRECTIONS. ALL SOFT SPOTS SHALL BE UNDERCUT AND RE-COMPACTED WITH SUITABLESTRUCTURAL FILL MATERIAL. MINIMUM AXLE WEIGHT = 10 TONS.11.THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS ANDPROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND WILL NOT BE LIMITED TO NORMAL WORKING HOURS.THE DUTY OF THE ENGINEER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THEADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES, IN, ON, OR NEAR THE CONSTRUCTION SITE. THE CONTRACTOR WILL BE RESPONSIBLE FORPROVIDING AND MAINTAINING ALL BARRICADES, WARNING SIGNS, FLASHING LIGHTS, AND TRAFFIC CONTROL DEVICES DURING CONSTRUCTION. THECONTRACTOR IS TO COMPLY WITH ALL OSHA REGULATIONS, REQUIREMENTS, AND SAFETY MEETING REQUIREMENTS.12.ALL NEW ELEVATIONS SHOWN ARE FINISH GRADE ELEVATION. THE GRADING CONTRACTOR SHALL DEDUCT THE FOLLOWING FOR SUBGRADE ELEVATION:·BUILDING FLOOR - SEE ARCHITECTURAL PLANS·HEAVY DUTY PAVEMENT - 11"·LIGHT DUTY PAVEMENT - 8"·PCC PAVEMENT - 12"·SIDEWALKS - 4"·TURF AREAS - 4"13.THE CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION THAT ARE WITHIN 5 FEET OF NEW CONSTRUCTION. REMOVE DEBRIS FROM SITE OR BURN INACCORDANCE WITH LOCAL LAWS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING NECESSARY BURNING PERMITS. PROTECT ALL TREES THATARE TO REMAIN.14.TOPSOIL SHALL BE STRIPPED TO A DEPTH AS REQUIRED BY OWNER OR GEOTECH AND STOCKPILED AS DIRECTED BY THE OWNER'S REPRESENTATIVE.15.THE TOP 18" OF FILL SHALL BE COMPACTED TO 98% OF MAXIMUM DRY DENSITY BY THE STANDARD PROCTOR METHOD ASTM D-698. ALL OTHER FILL SHALL BECOMPACTED TO 95% MAXIMUM DRY DENSITY. MOISTURE SHALL BE CONTROLLED TO WITHIN ±2% OF OPTIMUM.16.ALL EXCAVATION SHALL BE "CLASSIFIED EXCAVATION". EXCAVATION SHALL BE "CLASSIFIED" AS "COMMON EXCAVATION" OR "ROCK EXCAVATION". ROCKEXCAVATION SHALL BE CLASSIFIED AS FOLLOWS:·MASSIVE ROCK EXCAVATION - ANY MATERIAL WHICH CANNOT BE EXCAVATED WITH A SINGLE TOOTH RIPPER DRAWN BY A CRAWLER TRACTOR HAVING AMINIMUM DRAW BAR RATED AT NOT LESS THAN 53,000 POUNDS (CATERPILLAR D-8 OR EQUIVALENT) AND OCCUPYING AN ORIGINAL VOLUME OF AT LEAST ONECUBIC YARD OR MORE.·TRENCH EXCAVATION - ANY MATERIAL WHICH CANNOT BE EXCAVATED WITH A POWER SHOVEL HAVING THE CAPACITY OF AT LEAST THAT OF A CATERPILLAR225 AND OCCUPYING AN ORIGINAL VOLUME OF AT LEAST 1/2 CUBIC YARD OR MORE.COMMON EXCAVATION SHALL INCLUDE ALL MATERIALS THAT CAN BE RIPPED, BOULDERS, AND ALL OTHER MATERIALS THAT DO NOT FALL IN THE CATEGORYOF ROCK EXCAVATION AS DEFINED ABOVE.17.THE CLASSIFICATION OF SOILS INCLUDE: TOPSOIL, FILL MATERIAL, UNSUITABLE MATERIAL, AND ROCK EXCAVATION. THE CLASSIFICATION OF SOILS IS THERESPONSIBILITY OF THE OWNER'S SOIL TESTING FIRM.18.ALL FILL MATERIAL SHALL CONSIST OF AN APPROVED MATERIAL AND BE FREE OF ORGANIC MATTER AND DEBRIS. IMPORTED FILL SHALL HAVE A MINIMUMSTANDARD PROCTOR MAXIMUM DRY DENSITY OF 95 PCF, CLAY/SILT FINES CONTENT NOT GREATER THAN 25%, AND A PLASTICITY INDEX LESS THAN 15%.19.ALL EXISTING SLOPES STEEPER THAN 4:1 THAT WILL RECEIVE FILL SHALL BE PLOWED AND SCARIFIED SO NEW FILL WILL BOND WITH EXISTING SURFACE.20.CONTRACTOR SHALL SCARIFY ALL EXISTING ASPHALT PAVEMENT BEFORE PLACING FILL, UNLESS OVERLAYING ASPHALT ONTO EXISTING ASPHALT.21.THE GRADING CONTRACTOR SHALL CONFORM TO ELEVATIONS AND DIMENSIONS SHOWN WITHIN A TOLERANCE OF PLUS OR MINUS 0.05 FEET. (FINAL GRADEDSURFACE UNDER BUILDING SLABS SHALL BE WITHIN A TOLERANCE OF 3/8" WHEN MEASURED WITH A 10' STRAIGHT EDGE). (FINAL PAVEMENT WEARINGCOURSE SURFACE SHALL BE WITHIN A TOLERANCE OF 3/16" WHEN MEASURED WITH A 10' STRAIGHT EDGE.) (PAVEMENT VARIATION FROM TRUE DESIGNELEVATION SHALL BE 1/4" OR LESS.)22.SPOT ELEVATIONS SHALL TAKE PRECEDENCE OVER CONTOURS AND SLOPES SHOWN. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF SPOT ELEVATIONSWHICH DO NOT APPEAR TO BE CONSISTENT WITH THE CONTOURS AND SLOPES. SPOT ELEVATIONS SHALL BE USED FOR SETTING ELEVATIONS OF CURB ANDGUTTER AND UTILITIES.23.IF GRADE ADJUSTMENTS ARE REQUIRED, THE CONTRACTOR SHALL NOTIFY THE THE ENGINEER TO INVESTIGATE SUCH ADJUSTMENTS.24.GRADES SHOWN AT ALL ENTRANCES ARE DESIGN GRADES. CONTRACTOR SHALL COORDINATE GRADING IN THESE AREAS WITH THE EXISTING FEATURES INTHE FIELD AND/OR CURRENT DESIGN DRAWINGS.25.SITE CONTRACTOR SHALL EXTEND UNDERGROUND ROOF DRAINAGE PIPING TO WITHIN 5 FT OF BUILDING FOR CONNECTION TO ROOF DOWNSPOUTS.CONNECTIONS SHALL BE COORDINATED WITH BUILDING CONTRACTOR.26.ALL ROADS AND PARKING LOTS SHALL HAVE A MINIMUM 3'-0" WIDE GRASSED SHOULDER. A 5'-0" WIDE SHOULDER IS PREFERRED AND SHALL BE PROVIDEDWHERE POSSIBLE.27.ALL REINFORCED CONCRETE PIPE (RCP) SHALL BE CLASS III, UNLESS NOTED ON DRAWINGS WITH BELL & SPIGOT ENDS AND SHALL CONFORM TO ALLREQUIREMENTS OF ASTM C 76, LATEST EDITION, INSTALLED WITH FLEXIBLE PLASTIC (BITUMEN) GASKETS AT ALL JOINTS. GASKETS SHALL COMPLY WITHAASHTO M-198 751, TYPE B, AND SHALL BE INSTALLED IN STRICT ACCORDANCE WITH PIPE MANUFACTURER'S RECOMMENDATIONS.28.ALL CORRUGATED PLASTIC PIPE SHALL MEET THE REQUIREMENTS OF AASHTO M-294, TYPE S, SHALL BE SMOOTH INTERIOR WITH ANNULAR CORRUGATEDEXTERIOR. HI-Q SURE-LOCK 10.8 PIPE, ADS, N-12, OR APPROVED EQUAL. ALL JOINTS SHALL BE BELL AND SPIGOT AND SHALL MEET THE REQUIREMENTS OFAASHTO M-294, SHALL BE WATERTIGHT, MEETING THE REQUIREMENTS OF ASTM D 3212. THE GASKETS SHALL BE MADE OF POLYISOPRENE MEETING THEREQUIREMENTS OF ASTM F 477. INSTALLATION SHALL CONFORM TO AASHTO M-294, ASTM D-2321, AND MANUFACTURERS INSTALLATION PROCEDURES.29.ANY REINFORCED CONCRETE PIPE WITH MORE THAN 15 FOOT OF COVER SHALL BE CLASS IV WITH O-RING JOINTS.30.ALL STORM PIPE LENGTH AND ELEVATIONS (TOPS AND INVERTS) OF STORM DRAINAGE STRUCTURES SHOWN ON THE DRAWINGS ARE APPROXIMATE.CONTRACTOR MAY HAVE TO FIELD ADJUST AS NECESSARY DURING CONSTRUCTION. THE CONTRACTOR MAY USE PRE-CAST DRAINAGE STRUCTURES AS ANALTERNATE FOR STRUCTURES SPECIFIED ON THIS PLAN. HOWEVER, THE OWNER AND CLINE ENGINEERING, INC. ASSUME NO RESPONSIBILITY FOR THESESTRUCTURES, AS FIELD CONDITIONS DURING CONSTRUCTION OFTEN DICTATE ADJUSTMENTS STORM DRAINAGE STRUCTURES. THE CONTRACTOR RETAINSALL RESPONSIBILITY AND EXPENSE FOR MODIFYING THESE PRE-CAST STRUCTURES TO ACCOMMODATE THESE ADJUSTMENTS.31.ANY REINFORCED CONCRETE PIPE STEEPER THAN 10 PERCENT MUST HAVE CONCRETE COLLARS. CORRUGATED METAL PIPE WITH HUGGER BANDS MAY BESUBSTITUTED. THE NUMBER OF CONCRETE COLLARS AND TYPE OF STORM PIPE WILL BE DETERMINED TOGETHER BY THE CONTRACTOR AND THE ENGINEER.32.ALL SANITARY SEWER WORK SHALL BE CONSTRUCTED TO LINES AND GRADES SHOWN AND AS DETAILED ON THE DRAWINGS. ALL MANHOLE/CLEANOUT TOPELEVATIONS ON CIVIL DRAWINGS ARE APPROXIMATE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL MANHOLE/CLEANOUT TOPS AREFLUSH WITH PAVEMENT FINISHED GRADE THROUGHOUT THE PROJECT.33.THE CONTRACTOR SHALL PROVIDE STANDARD CLEAN-OUTS OR MANHOLES AT ALL BENDS AND CHANGES IN GRADE IN SEWER LINES AND CONNECTIONS TOEXISTING SEWER LINES. PIPE BEDDING AND BACKFILL SHALL BE CAREFULLY CONTROLLED. ALL SANITARY SEWER WORK SHALL COMPLY WITH LOCAL CODESAND ORDINANCES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING WITH THE LOCAL AND STATE SEWER APPROVAL AUTHORITIES TO INSURE THATALL MATERIALS, INSTALLATION, TESTING, AND AS-BUILT DRAWING REQUIREMENTS WILL BE TO THE SATISFACTION OF THE LOCAL AND STATE AUTHORITIES.34.ALL WATER LINES SHALL BE INSTALLED AS SHOWN ON THE DRAWINGS. ALL PIPES, VALVES, AND FITTINGS SHALL COMPLY WITH AWWA STANDARDS, ALL LOCALAND STATE CODES AND ORDINANCES. PIPE BEDDING AND BACKFILL SHALL BE CAREFULLY CONTROLLED. WATER LINES SHALL BE PRESSURE TESTED, ANDDISINFECTED AS REQUIRED. ALL NECESSARY AS-BUILTS SHALL BE ACCOMPLISHED TO THE SATISFACTION OF THE LOCAL AUTHORITY.35.ALL UTILITY TRENCHES SHALL BE THOROUGHLY COMPACTED AND TESTED TO PREVENT SETTLEMENT AND DAMAGE TO FUTURE PAVEMENT AND STRUCTURES.36.ASPHALT PAVING FOR LIGHT DUTY AREAS SHALL BE CONSTRUCTED ON A PREPARED AND WELL-DRAINED SUBGRADE COMPACTED AS SPECIFIED. THE BASECOURSE SHALL BE CONSTRUCTED WITH 6" COMPACTED THICKNESS STONE BASE. THE SURFACE COURSE SHALL BE CONSTRUCTED WITH 2" COMPACTEDTHICKNESS ALL PAVING WORK (MATERIALS AND CONSTRUCTION) SHALL COMPLY WITH STATE SPECIFICATIONS.37.ASPHALT PAVING FOR HEAVY DUTY AREAS SHALL BE CONSTRUCTED ON A PREPARED AND WELL-DRAINED SUBGRADE COMPACTED AS SPECIFIED. THE BASECOURSE SHALL BE CONSTRUCTED WITH 8" COMPACTED THICKNESS STONE BASE. THE BINDER COURSE SHALL BE CONSTRUCTED WITH 1.5" COMPACTEDTHICKNESS ASPHALT CONCRETE. THE SURFACE COURSE SHALL BE CONSTRUCTED WITH 1.5" COMPACTED THICKNESS ASPHALT CONCRETE. ALL PAVINGWORK (MATERIALS AND CONSTRUCTION) SHALL COMPLY WITH STATE SPECIFICATIONS.38.CONCRETE TRUCK PAVEMENT SHALL BE CONSTRUCTED WITH 4,000 PSI CONCRETE, 6" THICK REINFORCED WITH 6" X 6" - W2.9 X W2.9 W.W.M. JOINTS SHALL BECONSTRUCTED AS SHOWN ON DETAILS.39.CONCRETE SIDEWALKS SHALL BE CONSTRUCTED WITH 3,000 PSI CONCRETE, 4" THICK NON-REINFORCED WITH JOINTS AS SHOWN ON DETAILS.40.ALL AREAS NOT COVERED BY BUILDINGS AND PAVEMENT SHALL RECEIVE TOPSOIL AND BE GRASSED IN ACCORDANCE WITH SPECIFICATIONS.41.CONCRETE CURB AND GUTTER SHALL BE 18" WIDE WITH 6" CURB CONSTRUCTED WITH 3,000 PSI CONCRETE WITH EXPANSION JOINTS AND CONTRACTIONJOINTS INSTALLED TO COMPLY WITH S.C.D.O.T. STANDARD SPECIFICATION FOR MATERIALS AND CONSTRUCTION OF CURB AND GUTTER.42.THE GRADING CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE AWAY FROM BUILDING AT ALL TIMES. CONTRACTOR SHALL BRING TO THE ATTENTION OFTHE ENGINEER ANY AREAS THAT MAY NOT DRAIN PROPERLY DURING CONSTRUCTION.43.GRADING CONTRACTOR SHALL INCLUDE IN COST ALL CUT/FILL AND IMPORT/EXPORT NECESSARY FOR EARTHWORK BALANCE. CONTRACTOR SHALL INCLUDEIN COST ALL WETTING/DRYING OF SOILS NECESSARY TO ACHIEVE COMPACTION PER SPECIFICATIONS.44.THE CONTRACTOR SHALL CONFORM TO THE CONSTRUCTION SEQUENCE.45.THE CONTRACTOR SHALL CONSTRUCT TEMPORARY SEDIMENT TRAPS BEFORE OTHER SITE GRADING AND SITEWORK IS BEGUN. THE SEDIMENT TRAPS ANDSEDIMENT CONTROL DURING CONSTRUCTION SHALL COMPLY WITH ALL LOCAL CODES AND REGULATIONS. AFTER ALL SITEWORK IS COMPLETED ANDGRASSING ESTABLISHED, THE GRADING CONTRACTOR SHALL REMOVE ALL SILT FROM THE SITE AND LEGALLY DISPOSE OF ALL SILT OFF-SITE AT NOADDITIONAL COST TO THE OWNER.46.THE CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE WHEN INSTRUCTIONS FROM REGULATORY AGENCIES ARE RECEIVED AND COMPLY WITHINSTRUCTIONS AS DIRECTED BY THE OWNER'S REPRESENTATIVE.47.THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE CONSTRUCTION DOCUMENTS AND SHALL AT ONCE REPORT TO THE ENGINEER ANYINCONSISTENCIES OR OMISSIONS DISCOVERED. THE CONTRACTOR SHALL TAKE FIELD MEASUREMENTS TO VERIFY THAT ALL LOCATIONS ARE CORRECTPRIOR TO COMMENCING CONSTRUCTION.48.THE CONTRACTOR SHALL NOT PERFORM ANY WORK ON ANY UTILITIES OR IN ANY PUBLIC RIGHT-OF-WAYS UNTIL HE HAS OBTAINED COPIES OF ALLNECESSARY ENCROACHMENT AND CONSTRUCTION PERMITS. ANY FIELD CHANGES WITHIN SCDOT R/W OR CHANGES THAT WOULD IMPACT SCDOT R/W WILLREQUIRE WRITTEN SCDOT APPROVAL PRIOR TO CHANGES BEING IMPLEMENTED IN THE FIELD. (E.G. DRAINAGE, GRADING, ACCESS DESIGN ETC..). 49.THE CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN FOR ALL LANE AND SHOULDER CLOSURES WILL NEED TO BE SUBMITTED FOR ALL WORK WITHINTHE R/W PRIOR TO CONSTRUCTION. NIGHT WORK COULD BE REQUIRED FOR ANY AND ALL LANE CLOSURES.50.THE OWNER SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF DRIVEWAYS AND OTHER ACCESS POINTS, INCLUDING ANY NEW DRAINAGE STRUCTURES,FOR AREAS WITHIN THE RIGHTS-OF-WAYS OF STATE MAINTAINED FACILITIES IN PERPETUITY.51.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING ANY EXISTING UTILITIES NECESSARY FOR SITE CONSTRUCTION INCLUDING ALL PERMITS ANDFEES.52.THE CONTRACTOR SHALL VERIFY BENCH MARK LOCATION AND ELEVATION WITH SURVEYOR BEFORE BEGINNING CONSTRUCTION.53.THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL EASEMENTS ON THE SITE BEFORE PROCEEDING WITH CONSTRUCTION.54.ALL PARKING LOT STRIPING IS TO BE PER SOUTH CAROLINA D.O.T. SPECIFICATIONS AND HAVE TWO (2) COATS OF PAINT. THE CONTRACTOR IS RESPONSIBLEFOR PROVIDING FIRE LANE STRIPING AND SIGNAGE TO MEET LOCAL REQUIREMENTS. THE BASES OF ALL LIGHT POLES, ALL SPEED BUMPS, ALL BOLLARDS,AND ALL FACES OF SIDEWALK THAT ARE NOT FLUSH WITH ASPHALT ARE TO BE PAINTED TRAFFIC YELLOW.55.IN THE CASE OF A CONFLICT IN SPECIFICATIONS, NOTES, OR DETAILS, THE STRICTER SHALL GOVERN.DEMOLITION NOTES1.DEMOLITION INCLUDES THE REMOVAL AND DISPOSAL OF DEMOLISHED MATERIALS, AS SHOWN ON THE DRAWINGS AND HEREIN SPECIFIED.2.CONDITIONS EXISTING AT THE TIME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY THE OWNER IN SO FAR AS PRACTICABLE, HOWEVER,VARIATIONS MAY OCCUR.3.STORAGE OR SALE OF DEMOLISHED MATERIAL ON THE SITE WILL NOT BE PERMITTED.4.THE USE OF EXPLOSIVES WILL BE PERMITTED ONLY WHEN AUTHORIZED BY THE CONSTRUCTION PROJECT MANAGER.5.CONDUCT DEMOLITION OPERATIONS AND THE REMOVAL OF DEBRIS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, WALKS, AND OTHERADJACENT OCCUPIED OR USED FACILITIES OR ADJACENT CONSTRUCTION PROCESSES.6.DO NOT CLOSE OR OBSTRUCT STREETS, WALKS OR OTHER OCCUPIED OR USED FACILITIES WITHOUT PERMISSION FROM THE CONSTRUCTION PROJECTMANAGER AND THE AUTHORITIES HAVING JURISDICTION. PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC WAYS IF REQUIRED BYGOVERNING REGULATIONS.7.ENSURE THE SAFE PASSAGE OF PERSONS AROUND THE AREA OF DEMOLITION. CONDUCT OPERATIONS TO PREVENT INJURY TO ADJACENT BUILDINGS,STRUCTURES, OTHER FACILITIES, AND PERSONS.8.PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION OPERATIONS AT NO COST TO THE OWNER.9.MAINTAIN EXISTING UTILITIES, INDICATED TO REMAIN, KEEP IN SERVICE, AND PROTECT AGAINST DAMAGE DURING DEMOLITION OPERATIONS. CONTRACTORSHALL FIELD LOCATE AND VERIFY ALL UTILITIES ON SITE.10.DO NOT INTERRUPT EXISTING UTILITIES SERVING OCCUPIED OR USED FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING FROM THE CONSTRUCTIONPROJECT MANAGER AND THE AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING UTILITIES, ASACCEPTABLE TO THE GOVERNING AUTHORITIES. NOTIFY ALL BUSINESSES IMPACTED IN ADVANCE OF ALL SCHEDULED UTILITY INTERRUPTIONS.11.COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION.12.DEMOLISH CONCRETE AND MASONRY IN SMALL SECTIONS.13.COMPLETELY FILL BELOW-GRADE AREAS AND VOIDS RESULTING FROM THE DEMOLITION OF STRUCTURES BELOW GRADE.14.PLACE FILL MATERIALS IN HORIZONTAL LAYERS NOT EXCEEDING 6" IN LOOSE DEPTH. COMPACT EACH LAYER AT OPTIMUM MOISTURE CONTENT OF THE FILLMATERIAL TO A DENSITY EQUAL TO THE ORIGINAL ADJACENT GROUND, UNLESS SUBSEQUENT EXCAVATION FOR NEW WORK IS REQUIRED. AFTER FILLPLACEMENT AND COMPACTION, GRADE THE SURFACE TO MEET ADJACENT CONTOURS AND TO PROVIDE FLOW TO SURFACE DRAINAGE STRUCTURES.15.REMOVE FROM THE SITE DEBRIS, RUBBISH, AND OTHER MATERIALS RESULTING FROM DEMOLITION OPERATIONS, OR AS DIRECTED BY THE CONSTRUCTIONPROJECT MANAGER AND LEGALLY DISPOSE OF DEBRIS "OFF-SITE".16.ALL PIPING, FENCING AND OTHER MATERIALS THAT INTERFERE WITH NEW CONSTRUCTION SHALL BE REMOVED OR ABANDONED AS DIRECTED BY THECONSTRUCTION PROJECT MANAGER.17.ALL SALVAGEABLE MATERIALS WILL REMAIN THE PROPERTY OF THE OWNER. THE CONTRACTOR SHALL REMOVE AND STORE THIS MATERIAL AS DIRECTED BYTHE CONSTRUCTION PROJECT MANAGER.18.TRANSPORT MATERIALS REMOVED FROM DEMOLISHED STRUCTURES AND DISPOSE OF "OFF" SITE AS REQUIRED. DEBRIS SHALL NOT BE "BURIED" OR LEFT ONSITE EXCEPT AS ALLOWED BY ALL APPLICABLE LAWS AND BY THE GEOTECHNICAL ENGINEER.19.THE CONTRACTOR IS TO MAINTAIN MINIMUM COVER OVER ALL UTILITY LINES THROUGHOUT CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FORREPAIRING ANY DAMAGE TO UTILITY LINES AT NO ADDITIONAL COST TO THE OWNER.20.THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO THE SITE OR TO THE BUILDING AND IMPROVEMENTS ON THE SITE THAT OCCUR DURINGCONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.21.THE CONTRACTOR MUST VISIT SITE PRIOR TO SUBMITTING BID AND INCLUDE IN HIS PRICE ALL DEMOLITION AND DISPOSAL COSTS TO REMOVE/RELOCATE ANYAND ALL ITEMS THAT MAY INTERFERE WITH NEW CONSTRUCTION.22.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES AND COORDINATE THE DEMOLITION, REMOVAL, RELOCATION, ABANDONMENT, ETC. OF ALLUTILITIES THAT INTERFERE WITH NEW CONSTRUCTION. ANY DEMOLITION AND RELOCATION SHOWN IS SCHEMATIC ONLY. THE CONTRACTOR IS RESPONSIBLEFOR COORDINATING THE DESIGN, CONSTRUCTION, AND EASEMENTS OF ALL UTILITY WORK WITH THE APPROPRIATE UTILITIES.23.DEMOLISH ALL EXISTING UTILITIES THAT LIE UNDER AND 10' OUTSIDE OF NEW BUILDING. THE EXISTING UTILITIES 10' OR MORE OUTSIDE NEW BUILDINGS MAYBE DRAINED AND FILLED WITH FLOWABLE FILL IF TESTING COMPANY APPROVES EXISTING BACKFILL.TEMPORARY SEEDINGDESCRIPTIONTHE PURPOSE OF TEMPORARY SEEDING IS TO REDUCE EROSION AND SEDIMENTATION BY STABILIZING DISTURBED AREAS THAT WOULD OTHERWISE LAY BARE FORLONG PERIODS OF TIME BEFORE THEY ARE WORKED OR STABILIZED. TEMPORARY SEEDING IS ALSO USED WHERE PERMANENT VEGETATION GROWTH IS NOTNECESSARY OR APPROPRIATE.WHEN AND WHERE TO USE ITTEMPORARY SEEDING IS USED ON EXPOSED SOIL SURFACES SUCH AS DENUDED AREAS, SOIL STOCKPILES, DIKES, DAMS, BANKS OF SEDIMENT BASINS, BANKS OFSEDIMENT TRAPS, AND TEMPORARY ROAD BANKS. TEMPORARY SEEDING PREVENTS AND LIMITS COSTLY MAINTENANCE OPERATIONS ON OTHER SEDIMENTCONTROL STRUCTURES. SEDIMENT CLEANOUT REQUIREMENTS FOR SEDIMENT BASINS, SEDIMENT, TRAPS, AND SILT FENCE IS REDUCED IF THE DRAINAGE AREA ISSEEDED WHEN GRADING AND CONSTRUCTION OPERATION ARE NOT TAKING PLACE.TEMPORARY STABILIZATION IS REQUIRED WITHIN 14 DAYS AFTER CONSTRUCTION ACTIVITY IS COMPLETE UNLESS CONSTRUCTION ACTIVITY IS GOING TO RESUMEWITHIN 21 DAYS. COVER SEEDED AREAS WITH AN APPROPRIATE MULCH TO PROVIDE PROTECTION FROM THE WEATHER. WHEN THE TEMPORARY VEGETATIONDOES NOT GROW QUICKLY OR THICK ENOUGH TO PREVENT EROSION, RE-SEED AS SOON AS POSSIBLE. KEEP SEEDED AREAS ADEQUATELY MOIST. IRRIGATE THESEEDED AREA IF NORMAL RAINFALL IS NOT ADEQUATE FOR THE GERMINATION AND GROWTH OF SEEDLINGS. WATER SEEDED AREAS AT CONTROLLED RATES THATARE LESS THAN THE RATE AT WHICH THE SOIL CAN ABSORB WATER TO PREVENT RUNOFF. RUNOFF OF IRRIGATION WATER WASTES WATER AND CAN CAUSEEROSION.SEED SELECTIONSEED SELECTION IS BASED ON GEOGRAPHICAL LOCATION, SOIL TYPE AND THE SEASON OF THE YEAR IN WHICH THE PLANTING IS TO BE DONE. USE THE TABLES INAPPENDIX C AS A GUIDE FOR CONVENTIONAL TILLAGE METHODS (PLOWING, SEEDBED PREPARATION, HYDROSEEDING, ETC). IF A FAST GROWING CROP TO NURSETHE PERMANENT SPECIE OR SPECIES IS REQUIRED, THEN USE THE MIX RATE. FAILURE TO CAREFULLY FOLLOW AGRONOMIC RECOMMENDATIONS RESULTS IN ANINADEQUATE STAND OF TEMPORARY VEGETATION THAT PROVIDES LITTLE OR NO EROSION CONTROL.INSTALLATION·TILLAGE: IF THE AREA HAS BEEN RECENTLY PLOWED, NO TILLAGE IS REQUIRED OTHER THAN RAKING OR SURFACE ROUGHENING TO BREAK ANY CRUST THATHAS FORMED LEAVING A TEXTURED SURFACE. DISK THE SOIL FOR OPTIMAL GERMINATION WHEN THE SOIL IS COMPACTED LESS THAN 6-INCHES.·SOIL TESTING: SOIL TESTING IS AVAILABLE THROUGH CLEMSON UNIVERSITY COOPERATIVE EXTENSION SERVICE.·LIME: LIME IS NOT REQUIRED FOR TEMPORARY SEEDING UNLESS A SOIL TEST SHOWS THAT THE SOIL PH IS BELOW 5.0. IT MAY BE DESIRABLE TO APPLY LIMEDURING THE TEMPORARY SEEDING OPERATION TO BENEFIT THE LONG-TERM PERMANENT SEEDING.·FERTILIZER: APPLY A MINIMUM OF 1.5 TONS OF LIME/ACRE (70 POUNDS PER 1000 SQUARE FEET) IF IT IS TO BE USED.APPLY A MINIMUM OF 500 POUNDS PERACRE OF 10-10-10 FERTILIZER (11.5 POUNDS PER 1000 SQUARE FEET) OR EQUIVALENT DURING TEMPORARY SEEDING UNLESS A SOIL TEST INDICATES ADIFFERENT REQUIREMENT. INCORPORATE FERTILIZER AND LIME (IF USED) INTO THE TOP 4-6 INCHES OF THE SOIL BY DISKING OR OTHER MEANS WHERECONDITIONS ALLOW.·SEEDING: LOOSEN THE SOIL SURFACE BEFORE BROADCASTING THE SEED. APPLY SEED EVENLY BY THE MOST CONVENIENT METHOD AVAILABLE FOR THETYPE OF SEED USED AND THE LOCATION OF THE TEMPORARY SEEDING. TYPICAL APPLICATION METHODS INCLUDE BUT ARE NOT LIMITED TO CYCLONESEEDERS, ROTARY SPREADERS, DROP SPREADERS, BROADCAST SPREADERS, HAND SPREADERS, CULTIPACKER SEEDER, AND HYDRO-SEEDERS. COVERAPPLIED SEED BY RAKING OR DRAGGING A CHAIN, AND THEN LIGHTLY FIRM THE AREA WITH A ROLLER OR CULTIPACKER.·MULCHING: USE MULCH WITH TEMPORARY SEED APPLICATIONS TO RETAIN SOIL MOISTURE AND REDUCE EROSION DURING THE ESTABLISHMENT OFVEGETATION. TYPICAL MULCH APPLICATIONS INCLUDE STRAW, WOOD FIBER, HYDROMULCHES, BFM AND FGM. USE HYDROMULCHES WITH A MINIMUM BLENDOF 70% WOOD FIBERS. THE MOST COMMONLY ACCEPTED MULCH USED IN CONJUNCTION WITH TEMPORARY SEEDING IS SMALL GRAIN STRAW. THIS STRAWSHOULD BE DRY AND FREE FROM MOLD DAMAGE AND NOXIOUS WEEDS. THE STRAW MAY NEED TO BE ANCHORED WITH NETTING OR EMULSIONS TO PREVENTIT FROM BEING BLOWN OR WASHED AWAY. APPLY THE STRAW MULCH BY HAND OR MACHINE AT THE RATE 1.5-2 TONS PER ACRE (90 POUNDS PER 1000SQUARE FEET). FREQUENT INSPECTIONS ARE NECESSARY TO CHECK THAT CONDITIONS FOR GROWTH ARE GOOD.·IRRIGATION: SEEDED AREAS SHOULD BE KEPT ADEQUATELY MOIST. IRRIGATE THE SEEDED AREA IF NORMAL RAINFALL IS NOT ADEQUATE FOR THEGERMINATION AND GROWTH OF SEEDLINGS. WATER SEEDED AREAS AT CONTROLLED RATES THAT ARE LESS THAN THE RATE AT WHICH THE SOIL CANABSORB WATER TO PREVENT RUNOFF. RUNOFF OF IRRIGATION WATER WASTES WATER AND CAN CAUSE EROSION.·RE-SEEDING: RE-SEED AREAS WHERE SEEDING DOES NOT GROW QUICKLY, THICK ENOUGH, OR ADEQUATELY TO PREVENT EROSION. BASE SEED SELECTIONSHOULD ON THE REQUIREMENTS OF LOCAL SPECIFICATIONS.INSPECTION AND MAINTENANCE·INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24-HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES ½-INCHES OR MORE OF PRECIPITATION.·COVER SEEDED WITH MULCH TO PROVIDE PROTECTION. FREQUENT INSPECTIONS ARE NECESSARY TO CHECK THAT CONDITIONS FOR GROWTH ARE GOOD.·SUPPLY TEMPORARY SEEDING WITH ADEQUATE MOISTURE. SUPPLY WATER AS NEEDED, ESPECIALLY IN ABNORMALLY HOT OR DRY WEATHER OR ONADVERSE SITES. CONTROL WATER APPLICATION RATES TO PREVENT RUNOFF.·BASE SEED SELECTION ON LOCAL SPECIFICATIONS.·RE-SEED AREAS WHERE THE PLANTS DO NOT GROW QUICK ENOUGH, THICK ENOUGH, OR ADEQUATELY ENOUGH TO PREVENT EROSION SHOULD BERE-SEEDED. PERMANENT SEEDINGDESCRIPTIONCONTROLLING RUNOFF AND PREVENTING EROSION BY ESTABLISHING A PERENNIAL VEGETATIVE COVER WITH SEED.WHEN AND WHERE TO USE ITA MAJOR CONSIDERATION IN THE SELECTION OF THE TYPE OF PERMANENT GRASS TO ESTABLISH IS THE INTENDED USE OF THE LAND. LAND USE IS SEPARATED INTO TWO CATEGORIES, HIGH-MAINTENANCE AND LOW-MAINTENANCE.·HIGH-MAINTENANCE: HIGH MAINTENANCE AREAS ARE MOWED FREQUENTLY, LIME OR FERTILIZED ON A REGULAR BASIS, AND REQUIRE MAINTENANCE TO ANAESTHETIC STANDARD. LAND USES WITH HIGH MAINTENANCE GRASSES INCLUDE HOMES, INDUSTRIAL PARKS, SCHOOLS, CHURCHES, AND RECREATIONALAREAS SUCH AS PARKS, ATHLETIC FIELDS, AND GOLF COURSES.·LOW-MAINTENANCE: LOW MAINTENANCE AREAS ARE MOWED INFREQUENTLY, IF AT ALL, AND LIME AND FERTILIZER MAY NOT BE APPLIED ON A REGULARSCHEDULE. THESE AREAS ARE NOT SUBJECT TO INTENSE USE AND DO NOT REQUIRE A UNIFORM APPEARANCE. THE VEGETATION MUST BE ABLE TO SURVIVEWITH LITTLE MAINTENANCE OVER LONG PERIODS OF TIME. GRASS AND LEGUME MIXTURES ARE FAVORED IN THESE AREAS BECAUSE LEGUMES ARE CAPABLEOF FIXING NITROGEN IN THE SOIL FOR THEIR OWN USE AND THE USE OF THE GRASSES AROUND THEM. LAND USES REQUIRING LOW-MAINTENANCE GRASSESINCLUDE STEEP SLOPES, STREAM AND CHANNEL BANKS, ROAD BANKS, AND COMMERCIAL AND INDUSTRIAL AREAS WITH LIMITED ACCESS.SEED SELECTIONTHE USE OF NATIVE SPECIES IS PREFERRED WHEN SELECTING VEGETATION. BASE PLANT SEED SELECTION ON GEOGRAPHICAL LOCATION, THE TYPE OF SOIL, THESEASON OF THE YEAR IN WHICH THE PLANTING IS TO BE DONE, AND THE NEEDS AND DESIRES OF THE PERMANENT LAND USER. FAILURE TO CAREFULLY FOLLOWAGRONOMIC RECOMMENDATIONS RESULTS IN AN INADEQUATE STAND OF PERMANENT VEGETATION THAT PROVIDES LITTLE OR NO EROSION CONTROL.INSTALLATION·TOPSOIL: APPLY TOPSOIL IF THE SURFACE SOIL OF THE SEEDBED IS NOT ADEQUATE FOR PLANT GROWTH.·TILLAGE: IF THE AREA HAS BEEN RECENTLY PLOWED, NO TILLAGE IS REQUIRED OTHER THAN RAKING OR SURFACE ROUGHENING TO BREAK ANY CRUST THATHAS FORMED LEAVING A TEXTURED SURFACE. DISK THE SOIL FOR OPTIMAL GERMINATION WHEN THE SOIL IS COMPACTED LESS THAN 6-INCHES. IF THE SOILIS COMPACTED MORE THAN 6-INCHES, SUB-SOILED AND DISK THE AREA.·SOIL TESTING: SOIL TESTING IS AVAILABLE THROUGH CLEMSON UNIVERSITY COOPERATIVE EXTENSION SERVICE.·LIME: UNLESS A SPECIFIC SOIL TEST INDICATES OTHERWISE, APPLY 1½ TONS OF GROUND COURSE TEXTURED AGRICULTURAL LIMESTONE PER ACRE (70POUNDS PER 1000 SQUARE FEET).·FERTILIZER: APPLY A MINIMUM OF 1000 POUNDS PER ACRE OF A COMPLETE 10-10-10 FERTILIZER (23 POUNDS PER 1000 SQUARE FEET) OR EQUIVALENTDURING PERMANENT SEEDING OF GRASSES UNLESS A SOIL TEST INDICATES A DIFFERENT REQUIREMENT. INCORPORATE FERTILIZER AND LIME (IF USED) INTOTHE TOP 4-6 INCHES OF THE SOIL BY DISKING OR OTHER MEANS WHERE CONDITIONS ALLOW. DO NOT MIX THE LIME AND THE FERTILIZER PRIOR TO THE FIELDAPPLICATION.·SEEDING: LOOSEN THE SURFACE OF THE SOIL JUST BEFORE BROADCASTING THE SEED. EVENLY APPLY SEED BY THE MOST CONVENIENT METHOD AVAILABLEFOR THE TYPE OF SEED APPLIED AND THE LOCATION OF THE SEEDING. TYPICAL APPLICATION METHODS INCLUDE BUT ARE NOT LIMITED TO CYCLONESEEDERS, ROTARY SPREADERS, DROP SPREADERS, BROADCAST SPREADERS, HAND SPREADERS, CULTIPACKER SEEDER, AND HYDRO-SEEDERS. COVERAPPLIED SEED BY RAKING OR DRAGGING A CHAIN OR BRUSH MAT, AND THEN LIGHTLY FIRM THE AREA WITH A ROLLER OR CULTIPACKER. DO NOT ROLL SEEDTHAT IS APPLIED WITH A HYDRO-SEEDER AND HYDRO-MULCH.·MULCHING: COVER ALL PERMANENT SEEDED AREAS WITH MULCH IMMEDIATELY UPON COMPLETION OF THE SEEDING APPLICATION TO RETAIN SOIL MOISTUREAND REDUCE EROSION DURING ESTABLISHMENT OF VEGETATION. APPLY THE MULCH EVENLY IN SUCH A MANNER THAT IT PROVIDES A MINIMUM OF 75%COVERAGE. TYPICAL MULCH APPLICATIONS INCLUDE STRAW, WOOD FIBER, HYDROMULCHES, BFM AND FGM. USE HYDROMULCHES WITH A MINIMUM BLEND OF70% WOOD FIBERS. THE MOST COMMONLY ACCEPTED MULCH USED IN CONJUNCTION WITH PERMANENT SEEDING IS SMALL GRAIN STRAW. SELECT STRAWTHAT IS DRY AND FREE FROM MOLD DAMAGE AND NOXIOUS WEEDS. THE STRAW MAY NEED TO BE ANCHORED WITH NETTING OR ASPHALT EMULSIONS TOPREVENT IT FROM BEING BLOWN OR WASHED AWAY. APPLY STRAW MULCH BY HAND OR MACHINE AT THE RATE 2 TONS PER ACRE (90 POUNDS PER 1000SQUARE FEET). FREQUENT INSPECTIONS ARE NECESSARY TO CHECK THAT CONDITIONS FOR GROWTH ARE GOOD.·IRRIGATION: KEEP PERMANENT SEEDED AREAS ADEQUATELY MOIST, ESPECIALLY LATE IN THE SPECIFIC GROWING SEASON. IRRIGATE THE SEEDED AREA IFNORMAL RAINFALL IS NOT ADEQUATE FOR THE GERMINATION AND GROWTH OF SEEDLINGS. WATER SEEDED AREAS AT CONTROLLED RATES THAT ARE LESSTHAN THE RATE AT WHICH THE SOIL CAN ABSORB WATER TO PREVENT RUNOFF. RUNOFF OF IRRIGATION WATER WASTES WATER AND CAN CAUSE EROSION.·RE-SEEDING: INSPECT PERMANENTLY SEEDED AREAS FOR FAILURE, MAKE NECESSARY REPAIRS AND RE-SEED OR OVERSEED WITHIN THE SAME GROWINGSEASON IF POSSIBLE. IF THE GRASS COVER IS SPARSE OR PATCHY, RE-EVALUATE THE CHOICE OF GRASS AND QUANTITIES OF LIME AND FERTILIZER APPLIED.FINAL STABILIZATION BY PERMANENT SEEDING OF THE SITE REQUIRES THAT IT BE COVERED BY A 70% COVERAGE RATE.INSPECTION AND MAINTENANCE FOR PERMANENT SEEDING·INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS AND RE-SEED IMMEDIATELY. CONDUCT A FOLLOW-UP SURVEY AFTER ONE YEAR ANDREPLACE FAILED PLANTS WHERE NECESSARY.·IF VEGETATIVE COVER IS INADEQUATE TO PREVENT RILL EROSION, OVERSEED AND FERTILIZE IN ACCORDANCE WITH SOIL TEST RESULTS.·IF A STAND OF PERMANENT VEGETATION HAS LESS THAN 40 PERCENT COVER, RE-EVALUATE CHOICE OF PLANT MATERIALS AND QUANTITIES OF LIME ANDFERTILIZER.·RE-ESTABLISH THE STAND FOLLOWING SEED BED PREPARATION AND SEEDING RECOMMENDATIONS, OMITTING LIME AND FERTILIZER IN THE ABSENCE OFSOIL TEST RESULTS.·IF THE SEASON PREVENTS RE-SOWING, MULCH IS AN EFFECTIVE TEMPORARY COVER.·FINAL STABILIZATION OF THE SITE REQUIRES A 70 PERCENT OVERALL COVERAGE RATE. THIS DOES NOT MEAN THAT 30 PERCENT OF THE SITE CAN REMAINBARE. THE COVERAGE IS DEFINED AS LOOKING AT A SQUARE YARD OF COVERAGE, IN WHICH 70 PERCENT OF THAT SQUARE YARD IS COVERED WITHVEGETATION. TEMPORARY SEEDING - COASTALSPECIESRATES PER ACREPLANTING DATESSANDY, DROUGHTY SITESBROWNTOP MILLET40 LBS.MAR. 10 - SEPT. 1RYE, GRAIN56 LBS.SEPT. 1 - MAR. 15RYEGRASS50 LBS.SEPT. 1 - APR. 15WELL DRAINED, CLAYEY/LOAMEY SITESBROWNTOP MILLET OR JAPANESE MILLET40 LBS.MAR. 15 - SEPT. 1RYE, GRAINOR OATS56 LBS.75 LBS.SEPT. 1 - MAR. 15RYEGRASS50 LBS.SEPT. 1 - APR. 15 PERMANENT SEEDING - COASTALSPECIESRATES PER ACREPLANTING DATESSANDY, DROUGHTY SITESBROWNTOP MILLETBAHIAGRASS10 LBS.40 LBS.MAR. 10 - SEPT. 1BROWNTOP MILLETBAHIAGRASSSERICEA LESPEDEZA10 LBS.30 LBS.40 LBS.MAR. 10 - SEPT. 1BROWNTOP MILLETATLANTIC COASTALPANICGRASS10 LBS.15 LBS.PLSMAR. 10 - JUN. 25BROWNTOP MILLETSWITCHGRASS (ALAMO)LITTLE BLUESTEMSERICEA LESPEDEZA10 LBS.8 LBS. PLS4 LBS.20 LBS.MAR. 10 - JUN. 25BROWNTOP MILLETWEEPING LOVEGRASS10 LBS.8 LBS.MAR. 10 - JUN. 25WELL DRAINED, CLAYEY/LOAMEY SITESBROWNTOP MILLETBAHIAGRASS10 LBS.40 LBS.MAR. 15 - SEPT. 1RYE, GRAINBAHIAGRASSCLOVER, CRIMSON (ANNUAL)10 LBS.40 LBS.5 LBS.SEPT. 1 - NOV. 10BROWNTOP MILLETBAHIAGRASSSERICEA LESPEDEZA10 LBS.30 LBS.40 LBS.MAR. 15 - SEPT. 1BROWNTOP MILLETBERMUDA, COMMONSERICEA LESPEDEZA10 LBS.10 LBS.40 LBS.MAR. 15 - SEPT. 1BROWNTOP MILLETBERMUDA, COMMONKOBE LESPEDEZA (ANNUAL)10 LBS.12 LBS.10 LBS.MAR. 15 - SEPT. 1BROWNTOP MILLETBAHIAGRASSBERMUDA, COMMONSERICEA LESPEDEZA10 LBS.20 LBS.6 LBS.40 LBS.MAR. 15 - SEPT. 1BROWNTOP MILLETSWITCHGRASSLITTLE BLUESTEMINDIANGRASS10 LBS.8 LBS. PLS3 LBS. PLS3 LBS. PLSMAR. 15 - SEPT. 1 PLOT DATE: 7/29/2026 10:53:55 AMFILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0028 C L I N EE N G I N E E R I N G THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING. REV.DATEDRAWNAPPV.DESCRIPTION SHEET NUMBERPROJECT MANAGERDRAWN BYPROJECT DATEJOB NUMBER PROFESSIONAL DESIGN CONSULTING50 41ST AVENUEISLE OF PALMS, SOUTH CAROLINAIOP MASTER PLAN 22047AUGUST 2022AJ/JRMDC A07/29/2026ISSUED FOR REVIEW AND APPROVAL--MDC G-3GENERAL NOTES WATER LINES1.ALL WATER LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND DETAILS. ALL MATERIALS AND PRODUCTS THAT CONTACT POTABLEWATER MUST BE THIRD PARTY CERTIFIED AS MEETING THE SPECIFICATIONS OF ANSI/NSF STANDARD 61. ALL PIPING MATERIALS AND INSTALLATION SHALLMEET THE APPROVAL OF THE LOCAL AUTHORITY AND THE STATE HEALTH AUTHORITY.2.ALL DUCTILE IRON PIPE (DIP) SHALL BE PRESSURE CLASS "350" CONFORMING TO AWWA C151. ALL FITTINGS SHALL BE EITHER MECHANICAL OR PUSH-ON JOINTAND SHALL COMPLY WITH AWWA C110. ALL POLY-VINYL CHLORIDE WATER LINES 4" AND SMALLER SHALL BE CLASS 200 -SDR21 CONFORMING TO ASTM D-2241AND ASTM D-1784. WATER LINES 6" AND LARGER SHALL BE 235, DR18, JM EAGLE OR APPROVED EQUAL CONFORMING TO AWWA C-900 AND N.S.F. APPROVED. ADETECTABLE TAPE WITH THE WORDS "CAUTION: WATERLINE BURIED BELOW" SHALL BE INSTALLED 6" TO 12" ABOVE THE PIPE.3.SEAMLESS COPPER TUBING, 3" AND SMALLER SHALL BE TYPE "K" ROLL FORM TO COMPLY WITH ASTM B-88, LATEST REVISION AND SHALL BE INSTALLED WITHWROUGHT COPPER (95-5 TIN ANTIMONY SOLDER JOINT) FITTINGS IN ACCORDANCE WITH ASTM B16.22.4.ALL WATER LINES SHALL BE PRESSURE TESTED TO 1.5 TIMES THE MAXIMUM WORKING PRESSURE, 150 PSIG (MINIMUM), CLEANED, STERILIZED, AND FLUSHEDUNTIL TWO SUCCESSIVE SATISFACTORY WATER BACTERIOLOGICAL SAMPLES TAKEN AT LEAST 24 HOURS APART ARE OBTAINED. THE SAMPLES SHALL BEANALYZED BY A STATE APPROVED LABORATORY. THE RESULTS SHALL INCLUDE BOTH COLIFORM AND NON-COLIFORM GROWTH. ALL BACKFLOW PREVENTIONDEVICES SHALL BE INSPECTED AND CERTIFIED BY A LICENSED INSPECTOR.5.ALL FIRE HYDRANTS SHALL COMPLY WITH AWWA C502 AND MEET THE APPROVAL OF THE LOCAL WATER AUTHORITY.6.ALL GATE VALVES SHALL COMPLY WITH AWWA C500, 175 PSI WORKING PRESSURE AND MEET THE APPROVAL OF THE LOCAL WATER AUTHORITY.7.A MINIMUM OF A DOUBLE CHECK VALVE (BACKFLOW PREVENTOR) ASSEMBLY SHALL BE INSTALLED ON ALL LINES DEDICATED FOR FIRE LINE SPRINKLERSYSTEMS IN A MANNER ACCEPTABLE TO THE LOCAL AUTHORITY. A BACKFLOW PREVENTION DEVICE MEETING STATE AND LOCAL REQUIREMENTS SHALL BEINSTALLED ON ALL DOMESTIC WATER LINES.8.ALL PIPE MATERIAL, SOLDER AND FLUX SHALL BE LEAD FREE (LESS THAN 0.2% LEAD IN SOLDER AND FLUX AND LESS THAN 8.0% LEAD IN PIPES AND FITTINGS).LUBRICANTS WHICH WILL SUPPORT MICROBIOLOGICAL GROWTH SHALL NOT BE USED FOR SLIP ON JOINTS. VEGETABLE SHORTENING SHALL NOT BE USED TOLUBRICATE JOINTS. NATURAL RUBBER OR OTHER MATERIAL WHICH WILL SUPPORT MICROBIOLOGICAL GROWTH MAY NOT BE USED FOR ANY GASKETS,O-RINGS, AND OTHER PRODUCTS USED FOR JOINTING PIPES, SETTING METERS OR VALVES, OR OTHER APPURTENANCES WHICH WILL EXPOSE THE MATERIALTO THE WATER.9.ALL WATER LINES SHALL BE INSPECTED BY THE UTILITY COMPANY AND THE ENGINEER AND CERTIFIED TO THE STATE HEALTH AUTHORITY BEFOREACCEPTANCE AND A PERMIT TO OPERATE WILL BE ISSUED AS REQUIRED.10.ALL WATER LINE SHALL HAVE A MINIMUM 3'-0" COVER.11.WATER LINE SHALL BE INSTALLED AFTER SANITARY SEWER LINES ARE COMPLETE WHERE THEY CROSS. CONTRACTOR SHALL MAINTAIN A 10' HORIZONTALAND 2' VERTICAL CLEARANCE OF WATER AND SEWER LINES. ALL WATER LINES SHALL CROSS ABOVE SEWER LINES.12.CONTRACTOR SHALL INCLUDE COST OF METER AND TAP FEES IN PROPOSAL. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL EXCAVATION, COORDINATIONAND SCHEDULING OF TAPS. THE CONTRACTOR WILL INSTALL WATER METER AND BOX AS FURNISHED BY THE LOCAL AUTHORITY AND INSTALL SERVICES LINESTO WITHIN 5' OF BUILDING AS INDICATED ON THE DRAWINGS.13.THE CONTRACTOR WILL FOLLOW PROCEDURES AS DIRECTED TO FLUSH, STERILIZE AND FURNISH WATER SAMPLES FOR TESTING AS PER AWWA 651 UNTILAPPROVAL IS GRANTED BY THE STATE HEALTH AUTHORITY AND THE LOCAL WATER SYSTEM. A PERMIT TO OPERATE WILL NOT BE ISSUED UNTIL THECOMPLETED WATER SYSTEM MEETS ALL REQUIRED STATE AND LOCAL APPROVALS. THE CONTRACTOR IS RESPONSIBLE TO FURNISH THE OWNER WITH ACOMPLETED AND APPROVED WATER SYSTEM ALONG WITH A SET OF APPROVED AS-BUILT DRAWINGS IN A FORMAT ACCEPTABLE TO THE LOCAL UTILITYAUTHORITY.14.THE CONTRACTOR SHALL NOT PERFORM ANY WORK UNTIL HE HAS OBTAINED COPIES OF ALL NECESSARY ENCROACHMENT AND CONSTRUCTION PERMITS.15.THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE LOCAL WATER AUTHORITY AND DETERMINING THE REQUIREMENTS AND PROCEDURES FOROBTAINING THE AUTHORITY'S APPROVAL OF THE WATER SYSTEM PRIOR TO SUBMITTING A PRICE TO THE OWNER. THE DETAILS AND SPECIFICATIONS OF THELOCAL WATER AUTHORITY SHALL GOVERN.SANITARY SEWER LINES1.ALL CONSTRUCTION SHALL BE PER THE LOCAL SEWER UTILITY'S REQUIREMENTS AND SPECIFICATIONS.2.THE PLUMBER IS RESPONSIBLE FOR SETTING INVERT ELEVATIONS, PIPE SLOPES, ETC MEETING ALL LOCAL AND STATE CODES.3.EACH JOINT SHALL BE CLEARLY AND LEGIBLY MARKED WITH THE MANUFACTURER'S NAME OR IDENTIFYING SYMBOL WITH THE LETTERS E.S. APPEARING ONTHE EXTERIOR OF THE PIPE NEAR THE SOCKET.4.A MINIMUM OF 3 FEET OF COVER SHALL BE MAINTAINED OVER ALL PVC PIPE LINES.5.WATER LINES SHALL BE INSTALLED AFTER ALL GRAVITY SEWER LINES ARE INSTALLED.6.THIS CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UNDERGROUND UTILITIES BEFORE COMMENCING WORK. CONTACT WATER, TELEPHONE,POWER AND GAS COMPANY BEFORE EXCAVATION IS BEGUN.7.THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SURVEY WORK NECESSARY TO STAKE SEWER LINES. THE CENTERLINE AND ALL CLEANOUT LOCATIONSSHALL BE STAKED IN THE FIELD. THE OWNER'S SURVEYOR WILL SET ALL LOT CORNERS. THE CONTRACTOR SHALL PROTECT ALL PROPERTY MARKERS.8.ALL UTILITY TRENCHES SHALL BE THOROUGHLY COMPACTED TO PREVENT SETTLEMENT AND DAMAGE TO FUTURE PAVEMENT AND STRUCTURES.9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRS TO EXISTING ROADS USED BY HIS OPERATION. THE CONTRACTOR SHALL REMOVE MUD AND DEBRISFROM HIGHWAY AND NOT ALLOW DUST TO BECOME A NUISANCE OR SAFETY HAZARD.10.ALL SANITARY SEWER WORK SHALL BE CONSTRUCTED TO LINES AND GRADES SHOWN AS DETAILED ON THE DRAWING. THE CONTRACTOR SHALL PROVIDESTANDARD MANHOLES OR CLEAN-OUTS AT ALL BENDS AND CHANGES IN GRADE IN SEWER LINES AND CONNECTIONS TO EXISTING SEWER LINES. PIPEBEDDING AND BACKFILL SHALL BE CAREFULLY CONTROLLED. ALL SANITARY SEWER WORK SHALL COMPLY WITH LOCAL CODES AN ORDINANCES. THEENGINEER, THE LOCAL AUTHORITY AND THE STATE HEALTH AUTHORITY MUST INSPECT ALL SEWER WORK AS REQUIRED BEFORE BEING PUT IN SERVICE.11.ALL WORK SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND INSTRUCTIONS GIVEN BY THE OWNER'SREPRESENTATIVE, THE STATE HEALTH AUTHORITY AND THE LOCAL GOVERNING AUTHORITY.12.ALL SEWER LINES IN RELATION TO WATER LINES MUST CONFORM TO "TEN STATES STANDARDS", SECTION 38.3, 1990 EDITION, AT A MINIMUM. MAINTAIN AMINIMUM OF 10' HORIZONTAL AND 2' VERTICAL SEPARATION BETWEEN THE WATER AND SANITARY SEWER LINES. WATER LINES SHALL CROSS OVER SANITARYSEWER LINES.13.CONTRACTOR TO ASSUME CLASS "B" BEDDING FOR SDR-26 PVC IN HIS BID PROPOSAL. CLASS "A" BEDDING WILL BE PAID FOR AS AN "EXTRA" SHOULD FIELDCONDITIONS REQUIRE THIS BEDDING.14.COUPLINGS SHALL BE EASTERN STANDARD SEWER REPAIR COUPLINGS AS MANUFACTURED BY MISSION RUBBER COMPANY, INC. CATALOG NO. 0408-807(8640) 0410-704 (0636), OR 0412-6250 (2636), OR AS MANUFACTURED BY FERNCO JOINT SEALER CO., FERNDALE, MICHIGAN, OR APPROVED EQUAL.15.SANITARY SEWER SERVICES SHALL BE INSTALLED PER DETAILS. LOCATION OF SERVICE LINES SHALL BE MEASURED FROM MANHOLES AND FURNISHED WITH"AS-BUILT" DRAWINGS TO THE ENGINEER. EACH BUILDING SHALL HAVE (1) 6" OR 4" SERVICE LINE, AS SPECIFIED FOR ON THE DRAWINGS, BROUGHT TO WITHIN5' OF THE BUILDING. SERVICE LINES SHALL BE INSTALLED AS REQUIRED ON PLANS. MINIMUM SLOPE AND CLEANOUT SPACING SHALL 1.04% FOR 6" AND 2.08%FOR 4" SERIES.16.ALL WATER AND SEWER LINE BACKFILL SHALL BE COMPACTED TO 95% STD. PROCTOR BY CONTRACTOR. THE OWNER SHALL TEST COMPACTION.17.THE OWNER SHALL PAY ALL SEWER TAP FEES TO THE LOCAL GOVERNING AUTHORITY. THE CONTRACTOR SHALL COORDINATE WITH LOCAL AUTHORITY ONSEWER TAPS.18.THIS CONTRACTOR SHALL SHORE TRENCH EXCAVATION AND USE PIPE BOX TO COMPLY WITH ALL OSHA SAFETY REGULATIONS. IT IS THE CONTRACTORSSOLE RESPONSIBILITY TO PROVIDE JOB SITE SAFETY AND COMPLY WITH ALL SAFETY REQUIREMENTS. THE CONTRACTOR IS RESPONSIBLE FOR HIS MEANSAND METHODS OF CONSTRUCTION.19.POLYVINYL CHLORIDE (PVC) 8" AND LARGER SHALL CONFORM TO ASTM D-3034, SDR-26, INSTALLED IN ACCORDANCE WITH ASTM D-2321. ELASTOMERIC JOINTSSHALL COMPLY WITH ASTM D-3212. SDR-26 SHALL BE INSTALLED IN CLASS "B" BEDDING AS DETAILED ON THE DRAWINGS. PVC SEWER 6" AND SMALLER SHALLCONFORM TO SCHEDULE 40.20.DUCTILE IRON SHALL BE PRESSURE CLASS "350", CONFORMING TO AWWA C151, FURNISHED AND INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS.JOINTS IN DIP AT THE CREEK CROSSING SHALL BE RESTRAINED FROM MOVEMENT (LOK-TIGHT OR APPROVED EQUAL).21.THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE LOCAL SEWER AUTHORITY AND DETERMINING THE REQUIREMENTS AND PROCEDURES FOROBTAINING THE AUTHORITY'S APPROVAL OF THE SEWER SYSTEM PRIOR TO SUBMITTING A PRICE TO THE OWNER. THE DETAILS AND SPECIFICATIONS OF THELOCAL SEWER AUTHORITY SHALL GOVERN.22.MANHOLE FRAME AND COVER SHALL BE MF-11 AND MC-18 RESPECTIVELY AS MANUFACTURED BY SUMTER MACHINERY COMPANY OR SEWER AUTHORITYAPPROVED EQUAL. FRAME SHALL WEIGH 208 POUNDS AND COVER SHALL WEIGH 120 POUNDS. ALL SURFACES OF FRAME AND COVER SHALL BE BITUMINOUSCOATED.23.STEPS SHALL BE COPOLYMER POLYPROPYLENE PLASTIC, REINFORCED WITH 1/2" GRADE 60 REINFORCEMENT OR SEWER DISTRICT APPROVED (IF ALLOWEDBY LOCAL AUTHORITY).24.ALL SANITARY SEWER LINES SHALL BE AIR TESTED AND MUST CONFORM TO ASTM C828, LATEST REVISION.25.ALL FLEXIBLE AND SEMI-RIGID PIPE SHALL BE TESTED BY PULLING A MANDREL, GO/NO GO, DEVICE BY HAND NO EARLIER THAN 30 DAYS AFTER THETRENCHING HAS BEEN COMPLETELY BACKFILLED. THE MAXIMUM ALLOWABLE DEFLECTION SHALL NOT EXCEED 5 PERCENT OF NOMINAL INSIDE DIAMETER.26.CONTRACTOR SHALL NOT TIE NEW SEWER LINE TO EXISTING MANHOLE UNTIL ALL CONSTRUCTION IS APPROVED, TESTED AND ACCEPTED BY THE LOCALGOVERNING AUTHORITY.27.A PRE-CONSTRUCTION CONFERENCE WITH THE CONTRACTOR, SEWER AUTHORITY, STATE HEALTH AUTHORITY, AND THE ENGINEER WILL BE HELD PRIOR TOSEWER LINE CONSTRUCTION. CONTRACTOR SHALL SET UP PRE-CONSTRUCTION CONFERENCE WITH CITY.28.THE CONTRACTOR SHALL GRASS ALL RIGHT-OF-WAY IN ACCORDANCE WITH SPECIFICATIONS FOR GRASSING.29.ALL SEWER LINE WORK SHALL BE "APPROVED" BY THE STATE HEALTH AND LOCAL AUTHORITY, AND "APPROVED" AS-BUILT DRAWINGS SHALL BE FURNISH TOTHE OWNER BEFORE CONTRACTOR RECEIVES FINAL PAYMENT.30.THE CONTRACTOR SHALL NOT PERFORM ANY WORK UNTIL HE HAS OBTAINED COPIES OF ALL NECESSARY ENCROACHMENT AND CONSTRUCTION PERMITS. SCDES1.IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TOHYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THESLOPE IS BROUGHT TO GRADE.2.STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILYOR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW.·WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS STABILIZATION MEASURES MUST BEINITIATED AS SOON AS PRACTICABLE.·WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE.3.ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATIONINDICATES THAT A BMP HAS BEEN INAPPROPRIATELY, OR INCORRECTLY, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATIONREQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION.4.PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBEDAREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARYSEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVESEDIMENT BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE.5.ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTIONACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TOCONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THESITE IS STABILIZED.6.THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THEGENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED.7.RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUALPROPERTY OWNERS SHALL FOLLOW THESE PLANS DURING CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN IN ACCORDANCE WITH S.C REG.72-300 ET SEQ. AND SCR100000.8.TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPERUNOFF AND/OR TO DIVERT SEDIMENT-LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS.9.ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILTFENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN’T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFERSHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOS..10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLYTREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANTSOURCE IN STORM WATER DISCHARGES.11.A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILYACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINALSTABILIZATION IS REACHED.12.INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND-DISTURBING ACTIVITIES HAVE PERMANENTLY ORTEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS.13.MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL.14.MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERSMUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE;15.MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGHAPPROPRIATE BMPS (SEDIMENT BASIN, FILTER BAG, ETC.).16.THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED·WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL;·WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS;·FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND·SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING.17.AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BECONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE.18.IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR SC’SWATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATIONBEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPS MUST BE IMPLEMENTEDAS SOON AS REASONABLY POSSIBLE.19.A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATIONOF CONSTRUCTION ACTIVITIES. FOR NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE THIS CONFERENCE MUST BE HELD ON-SITE UNLESS THEDEPARTMENT HAS APPROVED OTHERWISE.MISCELLANEOUS1.ALL RIP RAP FOR CHECK DAMS, EMERGENCY SPILLWAYS, AND OUTLET STABILIZATION PROTECTION TO BE UNDERLAIN WITH FILTER FABRIC. ALL RIP-RAPSHALL BE DUMPED RIP-RAP IN ACCORDANCE WITH THE SOUTH CAROLINA STATE HIGHWAY DEPARTMENT STANDARD SPECIFICATIONS FOR HIGHWAYCONSTRUCTION, LATEST EDITION. PIECES SHALL BE NO LARGER THAN 24 INCHES.2.ASPHALT DESIGN SHALL BE DONE BY GEOTECHICAL ENGINEER. CONTRACTOR TO COORDINATE WITH OWNER FOR ASPHALT SPECIFICATION.3.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS HIS REQUIRED FOR BORROW AREA (IF NEEDED).4.ALL EROSION CONTROL FOR STOCKPILING OF DIRT SHALL COMPLY WITH SCDES STANDARDS.5.SEDIMENT MUST BE REMOVED FROM SEDIMENT CONTROL DIKE WHEN SEDIMENT REACHES 50% OF THE SEDIMENT STORAGE VOLUME OR THE TOP OF THECLEAN-OUT STAKE, WHICHEVER IS LESS.6.ALL SLOPES DRAINING OFF-SITE, (NOT THROUGH POND) TO BE GRASSED AND STABILIZED WITH EROSION CONTROL BLANKETS. ABBREVIATIONS±MORE OR LESSØDIAMETERAASHTOAMERICAN ASSOCIATION OF STATE HIGHWAY TRANSPORTATION OFFICIALSAc.ACREADAAMERICANS WITH DISABILITY ACTANSIAMERICAN NATIONAL STANDARDS INSTITUTEASTMAMERICAN SOCIETY OF TESTING AND MATERIALSAWWAAMERICAN WATER WORKS ASSOCIATIONBMBENCHMARKBMPEROSION CONTROL BEST MANAGEMENT PRACTICESBOWBOTTOM OF WALLC&GCURB AND GUTTERCBCATCH BASINCIPCAST IN PLACECLCENTERLINECYCUBIC YARDDBHDIAMETER BREAST HEIGHTDESDEPARTMENT OF ENVIRONMENTAL SERVICESDIPDUCTILE IRON PIPEEEASTE.G.EXAMPLE GIVENELELEVATIONETCETCETERAFDCFIRE DEPARTMENT CONNECTIONFFEFINISHED FLOOR ELEVATIONFHWAFEDERAL HIGHWAY ADMINISTRATIONFIRMFLOOD INSURANCE RATE MAPFPEFINISHED PAD ELEVATIONFTFEET (LENGTH)HHORIZONTALHDPEHIGH-DENSITY POLYETHYLENEHPHIGH POINTIBCINTERNATIONAL BUILDING CODEIEINVERT ELEVATIONINVINVERTLBSPOUNDSLFLINEAR FEET (LENGTH)LPLOW POINTMAXMAXIMUMMINMINIMUMMPCEMATCH PRE-CONSTRUCTION ELEVATIONMS4sSTORMWATER DISCHARGE FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMSMUTCDMANUAL ON UNIFORM TRAFFIC CONTROL DEVICESNNORTHNENORTHEASTNO.NUMBERNSFNATIONAL SANITATION FOUNDATIONNTSNOT TO SCALENWNORTHWESTOCON CENTEROSHAOCCUPATIONAL SAFETY AND HEALTH ADMINISTRATIONPCPRECASTPVCPOLYVINYLCHLORIDERRADIUSRCPREINFORCED CONCRETE PIPER/WRIGHT OF WAYPSFPOUNDS PER SQUARE FOOT (PRESSURE)PSIPOUNDS PER SQUARE INCH (PRESSURE)PSIGPOUNDS PER SQUARE INCH GUAGESSOUTHSCDESSOUTH CAROLINA DEPARTMENT OF ENVIRONMENTAL SERVICESSCDOTSOUTH CAROLINA DEPARTMENT OF TRANSPORATIONSESOUTHEASTSFSQUARE FEETSTASTATIONSTD.STANDARDSWSOUTHWESTTCTOP OF CURBTPTOP OF PAVEMENTTOWTOP OF WALLTYPTYPICALVVERTICALVCPVITRIFIED CLAY PIPEWWESTWWFWELDED WIRE FABRICTHERE MAY BE ADDITIONAL ABBREVIATIONS USED IN THESE PLANS. PLEASE CONTACT ENGINEER IF ANY ABBREVIATION IS UNDEFINED ORUNCLEAR. OVERHEAD CABLEXOC LEGEND G XGGASOCDIVERSION BERMDBDIVERSION DITCHDDOVERHEAD ELECTRICXOEOEOVERHEAD TELEPHONEXOTOTPERMANENT DIVERSION DITCHPDROOF DRAINRDRSFREINFORCED SILT FENCESTORM DRAINAGEXDSDSANITARY SEWERXSSSSSDSUBSURFACE DRAINTEMPORARY DIVERSION DITCHTDTREE PROTECTIONTPC XCUNDERGROUND COMMUNICATIONE XEUNDERGROUND ELECTRICW XWWATERFIRE SERVICEFWX XXFENCE THERE MAY BE ADDITIONAL SYMBOLS USED IN THESE PLANS. PLEASE CONTACT ENGINEER IF ANY SYMBOL ISUNDEFINED OR UNCLEAR. EXISTINGPROPOSEDDESCRIPTION FIRE HYDRANTSEWER CLEANOUT ELECTRICAL BOXUTILITY POLEWATER VALVELIGHT POLEWATER METER CABLE BOXTELEPHONE BOX BENCHMARK POST INDICATOR VALVE IRON PINSIGNREDUCER TELEPHONE MANHOLEELECTRICAL MANHOLEPARKING COUNTFIRE DEPARTMENT CONNECTION ASPHALT PAVEMENT(LIGHT DUTY)CONCRETE PAVEMENTBRICK PAVEMENT OR HARDSCAPE WETLANDS PROPERTY BOUNDARYADJACENT/INTERNAL PROPERTY LINESBUFFERWETLANDSCENTERLINE GRAVEL PAVEMENT LIMITS OF DISTURBANCE UTILITY LINE, PIPE, OR CURB TO BE DEMOLISHEDASPHALT PAVEMENT(HEAVY DUTY) SANITARY SEWER MANHOLESTORM DRAINAGE - CATCH BASIN TYPE 16STORM DRAINAGE - CATCH BASIN TYPE 9STORM DRAINAGE - CURB INLET TYPE 1STORM DRAINAGE - DROP INLETSTORM DRAINAGE - JUNCTION BOX INLET PROTECTION TYPE AINLET PROTECTION TYPE FINLET PROTECTION TYPE EROCK OUTLET STABILIZATIONROCK SEDIMENT DIKESTORM DRAINAGE - MISCELLANEOUS TREE - TO BE REMOVEDTREE EASEMENTSETBACK ENTITY TO BE DEMOLISHED HOSE PULLHP ROCK CHECK DAMSILTSACK INLET PROTECTIONCONCRETE WASHOUT SILT FENCESF TREE - TO BE RELOCATEDPARKING ISLAND GUTTER EEL INLET PROTECTION TREE PROTECTION BARRICADETB oror or oror TURBIDITY BARRIER 6121)4#2*+%5748'; +5.'1(2#./5/#4+0# %*#4.'5610%1706;5176*%#41.+0# ,./ 5*''607/$'4 241,'%607/$'4 &4#90%*'%-'& &4#9+0)(+.'0#/' &#6'5748';'& 1( ENVIRONMENTAL ENGINEERING SURVEYING Engineering LLC a member of THE GEL GROUP problem solved P.O. BOX 30712 Charleston, SC 29417 2040 Savage Road Charleston, SC 29407 P 843.769.7378 F 843.769.7397 www.gel.com 018'/$'4 ,./ #6/#   #22418'&2.166'& ($  .#564'8+5'&  .+0'.')'0& GRAPHIC SCALE #$$4'8+#6+105 +1227/256#6+10 %106174+06'48#.ž SITE CONDITIONS V-1 SHEET NUMBER SITE CONDITION DATA PROVIDED TO CLINE ENGINEERING BY OTHERS. CONTRACTOR TO VERIFY PRIOR TO CONSTRUCTION. XDXDXDXDXDXDXD XDXDXD XDXDXDXDXDXD XDXDXDXDXDXDXD XDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXD XEXEXE XE XSXSXS XWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXW XWXWXWXW XWXWXWXW XWXWXWXWXWXWXWXW XWXWXWXWXWXWXW XWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXW XW XWXWXW XWXWXWXWXWXW XWXWXWXWXWXWXWXWXW XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXE XEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XDXDXDXDXDXDXDXDXDXD XCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXC XCXCXCXCXCXCXCXCXCXCXCXC XCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX ADA ACCESSIBLE PATH ADA ACCESSIBLE PATH PLOT DATE: 7/29/2026 10:54:21 AMFILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0025 C L I N EE N G I N E E R I N G THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING. REV.DATEDRAWNAPPV.DESCRIPTION SHEET NUMBERPROJECT MANAGERDRAWN BYPROJECT DATEJOB NUMBER PROFESSIONAL DESIGN CONSULTING50 41ST AVENUEISLE OF PALMS, SOUTH CAROLINAIOP MASTER PLAN 22047AUGUST 2022AJ/JRMDC A07/29/2026ISSUED FOR REVIEW AND APPROVAL--MDCSITE PLANC-1 N 53 27.9 Max 68.5° HorizMax 10° Vert43.542.5 23.5417.44.2WB-67 - Interstate Semi-TrailerOverall Length73.501ftOverall Width8.500ftOverall Body Height13.500ftMin Body Ground Clearance1.334ftMax Track Width8.500ftLock-to-lock time6.00sMax Steering Angle (Virtual)28.40° VEHICLE TRACKING SPECIFICATIONS SAFETY NOTE TO CONTRACTORTHE CONTRACTOR SHALL SHORE TRENCH EXCAVATION AND USEPIPE BOX TO COMPLY WITH ALL OSHA SAFETY REGULATIONS. IT ISTHE CONTRACTOR'S SOLE RESPONSIBILITY TO PROVIDE JOB SITESAFETY AND COMPLY WITH ALL SAFETY REQUIREMENTS. THECONTRACTOR IS RESPONSIBLE FOR HIS MEANS AND METHODS OFCONSTRUCTION.UTILITY NOTE TO CONTRACTORTHE UTILITIES SHOWN ARE FOR THE CONTRACTOR'SCONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOTSHOWN ON THESE PLANS. THE ENGINEER ASSUMES NORESPONSIBILITY FOR THE LOCATIONS SHOWN AND IT SHALL BETHE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATIONSOF ALL UTILITIES WITHIN THE LIMITS OF THE WORK. ALL DAMAGEMADE TO EXISTING UTILITIES BY THE CONTRACTOR SHALL BE THESOLE RESPONSIBILITY OF THE CONTRACTOR.SITE DATA TABLETAX MAP INFORMATION TMS # 571-08-00-007SUBJECT PARCEL(S) ZONINGGENERAL COMMERCIAL DISTRICT (GC1)SUBJECT PARCEL(S) AREA5.12 Ac.±BUILDING AREA - PROPOSEDNONEBUILDING SETBACKREQUIREMENTSN/ASITE BUFFERREQUIREMENTS15' BUFFER YARD ABUTTING RESIDENTIAL PROPERTYBUILDING HEIGHT LIMITSN/AFLOOD ZONE INFORMATION(PROVIDED BY OTHERS)PROJECT SITE APPEARS TO BE LOCATED IN FLOOD ZONE "AE(11 & 12)" AS SCALED FROM FIRM COMMUNITY PANEL NUMBER455416 AND MAP NUMBER 45019C0542K DATED JANUARY 29,2021. THE DEPICTION OF THE FLOOD ZONE WITHIN THIS SETOF PLANS SHALL NOT BE USED AS THE BASIS FOR FLOODZONE DETERMINATION OR FLOOD ZONE RELATED ISSUES. XDXDXDXDXDXDXD XDXDXD XDXDXDXDXDXD XDXDXDXDXDXDXD XDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXD XEXEXE XE XSXSXS XWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXW XWXWXWXW XWXWXWXW XWXWXWXWXWXWXWXW XWXWXWXWXWXWXW XWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXW XW XWXWXW XWXWXWXWXWXW XWXWXWXWXWXWXWXWXW XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXE XEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XDXDXDXDXDXDXDXDXDXD XCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXC XCXCXCXCXCXCXCXCXCXCXCXC XCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXC SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SFSFSFSFSFSFSFSFSF PLOT DATE: 7/29/2026 10:54:43 AMFILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0031 C L I N EE N G I N E E R I N G THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING. REV.DATEDRAWNAPPV.DESCRIPTION SHEET NUMBERPROJECT MANAGERDRAWN BYPROJECT DATEJOB NUMBER PROFESSIONAL DESIGN CONSULTING50 41ST AVENUEISLE OF PALMS, SOUTH CAROLINAIOP MASTER PLAN 22047AUGUST 2022AJ/JRMDC A07/29/2026ISSUED FOR REVIEW AND APPROVAL--MDC C-2DEMOLITION AND SWPPP N SAFETY NOTE TO CONTRACTORTHE CONTRACTOR SHALL SHORE TRENCH EXCAVATION AND USEPIPE BOX TO COMPLY WITH ALL OSHA SAFETY REGULATIONS. IT ISTHE CONTRACTOR'S SOLE RESPONSIBILITY TO PROVIDE JOB SITESAFETY AND COMPLY WITH ALL SAFETY REQUIREMENTS. THECONTRACTOR IS RESPONSIBLE FOR HIS MEANS AND METHODS OFCONSTRUCTION.UTILITY NOTE TO CONTRACTORTHE UTILITIES SHOWN ARE FOR THE CONTRACTOR'SCONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOTSHOWN ON THESE PLANS. THE ENGINEER ASSUMES NORESPONSIBILITY FOR THE LOCATIONS SHOWN AND IT SHALL BETHE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATIONSOF ALL UTILITIES WITHIN THE LIMITS OF THE WORK. ALL DAMAGEMADE TO EXISTING UTILITIES BY THE CONTRACTOR SHALL BE THESOLE RESPONSIBILITY OF THE CONTRACTOR. XDXDXDXDXDXDXD XDXDXD XDXDXDXDXDXD XDXDXDXDXDXDXD XDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXD XEXEXE XE XSXSXS XWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXW XWXWXWXW XWXWXWXW XWXWXWXWXWXWXWXW XWXWXWXWXWXWXW XWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXW XW XWXWXW XWXWXWXWXWXW XWXWXWXWXWXWXWXWXW XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXE XEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XDXDXDXDXDXDXDXDXDXD XCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXC XCXCXCXCXCXCXCXCXCXCXCXC XCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SFSFSFSFSFSFSFSFSF PLOT DATE: 7/29/2026 10:55:06 AMFILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0032 C L I N EE N G I N E E R I N G THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING. REV.DATEDRAWNAPPV.DESCRIPTION SHEET NUMBERPROJECT MANAGERDRAWN BYPROJECT DATEJOB NUMBER PROFESSIONAL DESIGN CONSULTING50 41ST AVENUEISLE OF PALMS, SOUTH CAROLINAIOP MASTER PLAN 22047AUGUST 2022AJ/JRMDC A07/29/2026ISSUED FOR REVIEW AND APPROVAL--MDC C-3GRADING AND DRAINAGE PLAN N SAFETY NOTE TO CONTRACTORTHE CONTRACTOR SHALL SHORE TRENCH EXCAVATION AND USEPIPE BOX TO COMPLY WITH ALL OSHA SAFETY REGULATIONS. IT ISTHE CONTRACTOR'S SOLE RESPONSIBILITY TO PROVIDE JOB SITESAFETY AND COMPLY WITH ALL SAFETY REQUIREMENTS. THECONTRACTOR IS RESPONSIBLE FOR HIS MEANS AND METHODS OFCONSTRUCTION.UTILITY NOTE TO CONTRACTORTHE UTILITIES SHOWN ARE FOR THE CONTRACTOR'SCONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOTSHOWN ON THESE PLANS. THE ENGINEER ASSUMES NORESPONSIBILITY FOR THE LOCATIONS SHOWN AND IT SHALL BETHE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATIONSOF ALL UTILITIES WITHIN THE LIMITS OF THE WORK. ALL DAMAGEMADE TO EXISTING UTILITIES BY THE CONTRACTOR SHALL BE THESOLE RESPONSIBILITY OF THE CONTRACTOR. XDXDXDXDXDXDXD XDXDXD XDXDXDXDXDXD XDXDXDXDXDXDXD XDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXDXD XEXEXE XE XSXSXS XWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXW XWXWXWXW XWXWXWXW XWXWXWXWXWXWXWXW XWXWXWXWXWXWXW XWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXW XW XWXWXW XWXWXWXWXWXW XWXWXWXWXWXWXWXWXW XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXE XEXEXE XEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXEXE XEXEXEXEXEXEXEXEXEXEXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXSXS XDXDXDXDXDXDXDXDXDXD XCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXC XCXCXCXCXCXCXCXCXCXCXCXC XCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SFSFSFSFSFSFSFSFSF PLOT DATE: 7/29/2026 10:55:26 AMFILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0033 C L I N EE N G I N E E R I N G THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING. REV.DATEDRAWNAPPV.DESCRIPTION SHEET NUMBERPROJECT MANAGERDRAWN BYPROJECT DATEJOB NUMBER PROFESSIONAL DESIGN CONSULTING50 41ST AVENUEISLE OF PALMS, SOUTH CAROLINAIOP MASTER PLAN 22047AUGUST 2022AJ/JRMDC A07/29/2026ISSUED FOR REVIEW AND APPROVAL--MDC C-4UTILITY PLAN N SAFETY NOTE TO CONTRACTORTHE CONTRACTOR SHALL SHORE TRENCH EXCAVATION AND USEPIPE BOX TO COMPLY WITH ALL OSHA SAFETY REGULATIONS. IT ISTHE CONTRACTOR'S SOLE RESPONSIBILITY TO PROVIDE JOB SITESAFETY AND COMPLY WITH ALL SAFETY REQUIREMENTS. THECONTRACTOR IS RESPONSIBLE FOR HIS MEANS AND METHODS OFCONSTRUCTION.UTILITY NOTE TO CONTRACTORTHE UTILITIES SHOWN ARE FOR THE CONTRACTOR'SCONVENIENCE ONLY. THERE MAY BE OTHER UTILITIES NOTSHOWN ON THESE PLANS. THE ENGINEER ASSUMES NORESPONSIBILITY FOR THE LOCATIONS SHOWN AND IT SHALL BETHE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATIONSOF ALL UTILITIES WITHIN THE LIMITS OF THE WORK. ALL DAMAGEMADE TO EXISTING UTILITIES BY THE CONTRACTOR SHALL BE THESOLE RESPONSIBILITY OF THE CONTRACTOR. NO UTILITY IMPROVEMENTS PROPOSED PLOT DATE: 7/29/2026 10:55:35 AMFILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0034 C L I N EE N G I N E E R I N G THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING. REV.DATEDRAWNAPPV.DESCRIPTION SHEET NUMBERPROJECT MANAGERDRAWN BYPROJECT DATEJOB NUMBER PROFESSIONAL DESIGN CONSULTING50 41ST AVENUEISLE OF PALMS, SOUTH CAROLINAIOP MASTER PLAN 22047AUGUST 2022AJ/JRMDC A07/29/2026ISSUED FOR REVIEW AND APPROVAL--MDC C-5CONSTRUCTION DETAILS CONSTRUCTION ENTRANCESouth Carolina Department ofHealth and Environmental ControlSIZESPECIFICATIONPLAN SYMBOL DATE South Carolina Department ofHealth and Environmental ControlCONSTRUCTION ENTRANCEDATEFLAT-BOTTOM TRENCH DETAIL V-SHAPED TRENCH DETAIL SILT FENCE INSTALLATION South Carolina Department ofHealth and Environmental Control PLAN SYMBOL DATESTANDARD DRAWING NO. South Carolina Department ofHealth and Environmental ControlDATESILTSACK INLET PROTECTION DETAILNOT TO SCALE · · · PLOT DATE: 7/29/2026 10:55:38 AMFILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0034 C L I N EE N G I N E E R I N G THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING. REV.DATEDRAWNAPPV.DESCRIPTION SHEET NUMBERPROJECT MANAGERDRAWN BYPROJECT DATEJOB NUMBER PROFESSIONAL DESIGN CONSULTING50 41ST AVENUEISLE OF PALMS, SOUTH CAROLINAIOP MASTER PLAN 22047AUGUST 2022AJ/JRMDC A07/29/2026ISSUED FOR REVIEW AND APPROVAL--MDC C-6CONSTRUCTION DETAILS TYPICAL PARKING SPACE DETAILNOT TO SCALETYPICAL ADA PARKING STRIPING DETAILNOT TO SCALEINTERNATIONAL ADA SYMBOL DETAILNOT TO SCALE ADA PARKING SIGN DETAILNOT TO SCALEDO NOT ENTER SIGN DETAILNOT TO SCALE ENTERDO NOT CHAIN LINK FENCE AND GATE DETAILNOT TO SCALE CONCRETE SIDEWALK DETAILNOT TO SCALESECTIONASECTIONBTYPICAL THICKENED EDGE AT PARKING LOT HEAVY DUTY ASPHALT PAVEMENTNOT TO SCALE PLOT DATE: 7/29/2026 10:55:39 AMFILE LOCATION: X:\2022\22047.ACAD\001\X\PRODUCTION.DRAWINGS\PD.0034 C L I N EE N G I N E E R I N G THIS DRAWING AND ASSOCIATED CAD FILES ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF CLINE ENGINEERING, INC. AND SHALL NOT BE USED OR REPRODUCED IN ANY WAY OTHER THAN AUTHORIZED BY CLINE ENGINEERING, INC. IN WRITING. REV.DATEDRAWNAPPV.DESCRIPTION SHEET NUMBERPROJECT MANAGERDRAWN BYPROJECT DATEJOB NUMBER PROFESSIONAL DESIGN CONSULTING50 41ST AVENUEISLE OF PALMS, SOUTH CAROLINAIOP MASTER PLAN 22047AUGUST 2022AJ/JRMDC A07/29/2026ISSUED FOR REVIEW AND APPROVAL--MDC C-7CONSTRUCTION DETAILS Created: 2026-01-06 12:52:58 [EST] (Supp. No. 27) Page 1 of 5 CHAPTER 2. SOLID WASTE1 Sec. 3-2-1. Burning to be performed in incinerator, etc. FD No person shall burn or cause to be burned any rubbish, trash, leaves, tree limbs, shavings, chips, sawdust or other debris within the City unless such material is burned in an incinerator or suitable metal container and such burning complies with all applicable state, federal and local environmental and safety laws, rules and regulations. (Code 1970, § 18-1; Code 1994, § 3-2-1; Ord. No. 1997-16, § 1, 8-26-1997) Sec. 3-2-2. Hours of authorized burning. FD Burning shall be allowed only during daylight hours. (Code 1994, § 3-2-2; Ord. No. 1997-16, § 2, 8-26-1997) State law reference(s)—Regulations of department of health and environmental control concerning burning, R 61- 62.2. Sec. 3-2-3. Procedure for burning quantity exceeding incinerator capacity. FD Whenever the material to be disposed of as set forth in section 3-2-1 exceeds the quantity that can be accommodated by an incinerator or suitable metal container, written permission to burn the material shall be secured from the Chief of the Fire Department and the burning shall be done only under the direction of the Fire Department and during daylight hours. (Code 1970, § 18-3; Code 1994, § 3-2-3) Sec. 3-2-4. Garbage containers required. (a) Residential. It shall be the duty of every owner or other occupant of a residential dwelling to use either a 96 90-gallon or a 40-gallon plastic roll-out cart approved by the City. Each dwelling shall receive one (1) cart from the City at no cost to the user. Additional carts may be rented purchased by the user. Each dwelling owner shall be responsible for damage to the cart unless such damage is caused by City personnel or normal wear. All garbage shall be kept in the carts until collected by the City and shall be kept closed in such a manner as will prevent access by flies, rodents and other animals. The cart and contents shall not weigh more than two hundred (200) pounds. No garbage cart shall be used for any other purpose. In the event of overflow, plastic bags which are tightly bound may be placed on the carts at curbside on the day of collection. In the event of regular overflow, the Director of Public Works may require owners to purchase an additional roll cart(s). The owner or occupant of any dwelling where carts or plastic bags are placed at curbside shall be responsible for prompt cleanup and removal of the contents of such carts and bags if the bags are torn or the carts overturned from any cause. If a cart is damaged through negligence or abuse, it 1State law reference(s)—Spilling loads on highways, S.C. Code 1976, § 56-5-4100; solid waste management; storage, transportation and collection of municipal solid wastes, S.C. Code Reg. 61-107.5; full cost disclosure by local governments concerning solid waste management, S.C. Code 1976, § 44-96-90. Created: 2026-01-06 12:52:58 [EST] (Supp. No. 27) Page 2 of 5 shall be the responsibility of the owner to replace the cart and the Public Works Department may refuse to handle such cart until it is replaced. Roll-out carts found to be inoperable due to normal wear or usage shall be repaired or replaced by the Public Works Department. The Public Works Department will notify users that a roll-out cart is unfit for continued use by placing a tag on the cart. All carts shall remain at the dwelling, and shall remain the property of the City. (b) Commercial. SUB CONTRACTED (1) Each business which generates a volume of garbage in excess of two (2) 90-gallon roll-out carts between scheduled collection dates of the Public Works Department may be required to use a bulk container of appropriate capacity approved by the Public Works Department if the site lacks sufficient area for safe and proper storage of the cart. (2) Bulk containers shall be of sufficient size to hold all garbage deposited between scheduled collection dates so that there shall be no spillage of garbage or other material from said container. (3) Bulk containers shall be placed in an area easily accessible to the equipment used for collection. Such area shall be designated for each container by the Public Works Department. (4) No container used for garbage shall be used for any other purpose. Garbage will be collected only if it is deposited in an approved container at a location also approved by the Public Works Department. (5) The Public Works Department may refuse service to any bulk container that is no longer in serviceable condition to rust, wear, or other damage. (6) It shall be the duty of the commercial user to maintain the bulk container in a reasonably clean and sanitary condition. (c) Rental property. The owner and tenant of each rental property shall have joint and several liability for any violation of this section. (d) Proper disposal. It shall be unlawful for any person to place any material in any bulk container, or garbage roll-out cart, which at the time of collection is not qualified for municipal solid waste disposal at the County solid waste landfill or Resource Recovery Center. (Code 1994, § 3-2-4; Ord. No. 1979-16, 10-14-1979; Ord. No. 1997-16, § 3, 8-26-1997) Sec. 3-2-5. Trash collection. (a) No waste which at the time of collection is defined by the United States Environmental Protection Agency or the State Department of Health and Environmental Control as hazardous waste shall be collected by the City. (b) No tires, batteries, motor oil, petroleum products or auto parts of any kind will be collected by the City. No paint shall be mixed in with household trash into city roll carts. Paint spillage on to city, state or private roads is not the responsibility of the Isle of Palms public service department. Proper disposal of same shall be the responsibility of the owner or person in possession of the same. (c) Leaves and grass clippings. All leaves and grass clippings shall be placed at the curb in front of the property in bio-degradable paper bags or plastic containers for collection. No plastic bags shall be used for the disposal of leaves or grass clippings. No household garbage or other materials may be placed with leaves or grass clippings. No mixed materials or plastic bags will be collected by the City. Home composting of leaves and grass clippings is encouraged. (d) Logs, limbs, brush, and like materials shall be placed at the curb in front of the property in the following manner: (1) Length of material shall not exceed four feet. Created: 2026-01-06 12:52:58 [EST] (Supp. No. 27) Page 3 of 5 (2) Diameter of material shall not exceed four inches. (3) The City will only collect materials as listed in this category which are generated by routine landscape maintenance on developed lots. Debris generated by grading or clearing of undeveloped property shall be disposed of by the party generating such debris. The city will not collect materials listed in this category which are generated by landscapers, tree services or other contractors. Debris resulting from commercial landscaping maintenance operations tree service or other contractors shall be removed and legally disposed of by the contractor. (4) When placed at the curbside for collection, materials shall not obstruct access to water meters, stormwater collection boxes, sewer manhole covers, or fire hydrants. (5) No garbage shall be mixed with the items listed in this category. (6) No plastic bags shall be used for the disposal of any items listed in this category. (e) Building materials, furniture or other trash shall be placed at the curb in front of the property for collection in the following manner: Builder refuse which is generated exclusively by an owner or resident shall be collected by the city when the volume of the said material does not exceed limits outlined in the Solid Waste Services Collection Procedures (1) Any single collection day will be limited to the equivalent of two ninety six (19280 ) gallons in volumevolume, the equivalent of two trash carts. (2) No hazardous waste as defined in subsection (a) of this section will be collected by the Citycity. (3) No roofing shingles will be collected by the Citycity. (4) No building materials or other trash generated by a contractor shall be collected by the City. (5) Items within this category shall be separated at the curb for collection. Any materials in these categories that are mixed together shall not be collected by the City. (6) No garbage shall be mixed with the items in this category. (f) Collection days shall be designated by the cCity, from time to time. Reasonable notice will be given by the City of collection schedules or practices. Garbage and trash shall be collected according to the schedule established by the Director of Public Services Department. Property owners and tenants shall be notified of such schedule change or practices by public notice. (Code 1994, § 3-2-5; Ord. No. 1993-8, 5-25-1993; Ord. No. 1997-16, § 4, 8-26-1997; Ord. No. 1998-8, 4-28-1998; Ord. No. 2011-03, § 1, 3-22-2011) Sec. 3-2-6. Removal of contractors' and builders' refuse. Contractors' and builders' refuse , generated by a contractor, construction material such as bricks, scraps of lumber, mortar, plaster, roofing, guttering, shavings, vegetative debris and all other like materials shall be removed by the contractor, owner or tenant of the premises, each being jointly and severally responsible for such removal. (Code 1970, § 18-7; Code 1994, § 3-2-6; Ord. of 1-13-1977) Created: 2026-01-06 12:52:58 [EST] (Supp. No. 27) Page 4 of 5 Sec. 3-2-7.Dumping, Scattering scattering of contents or rummaging through garbage containers. It shall be unlawful for any person to dump, scatter or spread, or allow to be dumped, scattered or spread, the contents of garbage carts, bags,vegitative debris, or containers ,or offloading of trucks or trailers of debris generated outside of the isle of Palms on public or private, on any property in the City, and further it shall be unlawful for any person to enter upon or rummage or plunder through the contents of any garbage cart, bag or container of another, or to use the container or trash enclosure of another without permission. Placing items on vacant parcels or on any public or on any public property shall be considered illegal dumping. (Code 1970, § 18-9; Code 1994, § 3-2-7; Ord. of 1-13-1977; Ord. No. 1997-16, § 5, 8-26-1997) Sec. 3-2-8. Garbage roll-out carts and county recycling containers shall not be kept upon street or road rights-of-way. Garbage roll-out carts and county recycling containers shall not be placed in the right-of-way of a street or road except when placed for collection. Garbage carts and recycling containers shall not be placed for collection prior to 5:00 p.m. on the day before collection. Garbage carts and recycling containers shall be removed from the right-of-way no later than 9:00 a.m. on the day following collection. Except for such times when lawfully placed for collection, no garbage carts or recycling containers shall be allowed to remain clearly visible from a street, road, or right-of-way. Garbage carts and recycling containers located on publicly owned areas, including, but not limited to, public parking lots, public parks, public beach and recreational areas, or any City-owned property, are exempt from the requirements of this section. The City has the right to move garbage carts and recycling containers placed in violation of this section. (Code 1970, § 18-10; Code 1994, § 3-2-8; Ord. of 1-13-1977; Ord. No. 1997-16, § 6, 8-26-1997; Ord. No. 2001-3, § 1, 2-27-2001; Ord. No. 2013-03, § 1, 5-28-2013) Editor's note(s)—Ord. No. 2013-03, § 1, adopted May 28, 2013, changed the title of § 3-2-8 from garbage roll-out carts shall not be kept upon street or road rights-of-way to garbage roll-out carts and county recycling containers shall not be kept upon street or road rights-of-way. PAPER AND CARDBOARD. (A) Paper and cardboard boxes in large quantities shall be disposed of at a recycling center. (B) If being disposed disposed of in the Charleston County blue recycling carts, cardboard boxes must be broken down and fit loosely in the cart. Sec. 3-2-9. Scheduled Collection. All garbage generated from residential property will be collected in accordance with schedules established by the City from time to time. Scheduled collections of, garbage,garbage and trash shall be collected according to the schedule established by the Director of Public Services Department. Property owners and tenants shall be notified of such schedule change or practices by public notice. (Code 1994, § 3-2-9; Ord. No. 1997-16, § 7, 8-26-1997) Created: 2026-01-06 12:52:58 [EST] (Supp. No. 27) Page 5 of 5 Sec. 3-2-10. Placing garbage roll-out carts for collection. When placing garbage roll-out carts for collection, they shall be placed within ten (10) 3 feet of the edge of the pavement of the street. Carts which are not placed in a location which is easily accessible by collection personnel and equipment will not be emptied. The handles of the carts shall be faced toward the street unless otherwise notified by the public services department with the implementation of the automatic side loading garbage truck which will effect which may affect handle placement, distance from the curb and distance from .obstructions.. (Code 1994, § 3-2-10; Ord. No. 1997-16, § 8, 8-26-1997) Sec. 3-2-11. Collection of major household appliances. The collection of major household appliances such as refrigerators, washing machines, dryers, dishwashers, furniture, bed mattresses, etc., are to be placed out on schedule pick up days Tuesday night for Wednesday pick up, unless otherwise agreed to by the Public Works Department. . (Code 1970, § 18-13; Code 1994, § 3-2-11) Sec. 3-2-12. Penalties for noncompliance with or violation of this chapter. Any person violating any provision of this chapter shall, upon conviction, be punished as provided in section 1-3-66. A violation of this chapter shall not be considered as a continuing offense, but each day that this chapter is violated shall be a separate and distinct offense. (Code 1994, § 3-2-12; Ord. No. 1979-16, 10-14-1979) Sec. 3-2-13. Definition of curb. For purpose of this chapter, the term "curb" shall include the edge of a street, road or right-of-way. (Code 1994, § 3-2-13; Ord. No. 2001-3, § 2, 2-27-2001) Jul y 6, 2026 S healy Truck Center 1340 Bluff Rd. Columbia SC 29211 S ubject: Letter of Intent to Purchase equipment D ear Johnathan Myers, The c ity of Isle of Palms hereby expresses its intent to purchase the following equipment from Shealy Truck Center under the terms outlined in your quotation dated January 25th, 2026: C hassis: 2027 Mack LR Equipment: New Way Sidewinder 31 YD Automated side loader South Carolina state contract #4400035137 Total purchase price: $428,007.08 (inclusive of applicable taxes and discounts) Estimated delivery: Chassis ETA May 25,2026: Equipment completion approximately 180 days after chassis receipt (November 25, 2027) Thi s purchase will be made in accordance with the specifications and terms provided in your proposal, Including warranty coverage and dealer services as stated. The city acknowledges the pricing disclaimer regarding potential tariff-related adjustment and agrees to work collaboratively should such circumstances arise. P lease consider this letter as confirmation of our intent to proceed with the purchase, subject to final approval by the City Council and execution of a formal purchase order. We appreciate your assistance and look forward to working with Shealy Truck center on this acquisition. S incerely, D ouglas Kerr City Administrator Mayor: Phillip Pounds City Council: Jan Anderson John Bogosian Blair Hahn Katie Miars Kevin Popson Rusty Streetman Jimmy Ward Scott Pierce CITY OF ISLE OF PALMS South Carolina P.O. Box 508 Isle of Palms, South Carolina 29451 (843) 886-6428 Fax (843) 886-8005 www.IOP.net ORDER # DATE Mileage QTY. YEAR MAKE MODEL TRUCK SERIAL # Unit Price Total 1 2027 $413,795.92 $0.00 $0.00 $0.00 $0.00 $13,438.16 $427,234.08 $0.00 $0.00 $48.00 $225.00 $500.00 $428,007.08 $0.00 $428,007.08 Warranties.THE DISTRUBUTOR AND THE MANUFACTURER MAKE NO WARRANTIES AS TO SAID VEHICLES(S). EXPRESS OR IMPLIED BY LAW, EXCEPT THE MANUFACTURER'S STANDARD VEHICLE WARRANTY, A COPY OF WHICH HAS BEEN DELIVERED TO THE PURCHASER AND WHICH IS INCORPORATED HEREIN BY REFERENCE. THE DISTRIBUTOR AND THE MANUFACTURERE SPECIFICALLY DISCLAMAND IMPLIED WARRANTY OR MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE AND ANY LIABLILTIY FOR CONSEQUENTIAL DAMAGES. UNLESS OTHERWISE STATE, THIS VEHICLE IS SOLD AS IS WITH NO WARRANTY EITHER EXPRESSED OR IMPLIED. PRICING BASED OFF QUOTE ID CUSTOMER SIGNATURE BELOW INDICATES APPROVAL OF SPECS ON QUOTE ID Shealy Truck Center "QUALITY WITHOUT COMPRIMSE " Since 1932 State Contract #4400035137 Allowed 5.88% Profit THIS PRICING INCLUDES ALL CURRENT MANUFACTURERS MATERIAL AND TRANSPORT SURCHARGES. FUTURE CHARGES THAT THE MANUFACTURER FUTURE CHARGES THAT THE MANUFACTURER DEEMS NECESSARY Mack LR TBD FET EXEMPT ITEMS Amick Equipment Supplied - New Way Sidewinder 31 YD ASL Body Piece Included - $213,334.04 SHEALY TRUCK CENTER 1340 BLUFF RD. COLUMBIA, SC 29201 Jonathan Myers CUSTOMER SIGNATURE DATE (Shealy's Sales ReprestaƟve) THOSE FEES WILL BE CALCULATED THROUGH THE DMV SYSTEM AT TIME OF DELIVERY. THERE IS A CLOSING DOC FEE OF $225. A SIGNED BUYERS ORDER, NON-REFUNDABLE DEPOSIT AND CREDIT APPROVAL REQUIRED PRIOR TO ORDERING THE TRUCK FET: TIRE TAX CREDIT: Titling P.O. BOX 940 DUNCAN, SC 29334 DEPOSIT RECEIVED: PHONE 800-968-4914 FAX 864-968-1171 DUE AT DELIVERY: P.O. BOX 12027 COLUMBIA, SC 29211 PHONE 800-951-8580 FAX 803-771-4879 SHEALY TRUCK CENTER OF THE PIEDMONT 331 MIDPOINT BLVD DUNCAN, SC 29334 SUB TOTAL: AS OF JANUARY 18, 2024 THE STATE OF SOUTH CAROLINA NOW REQUIRES SELLING DEALERS TO HANDLE WILL BE PASSED ALONG TO THE CUSTOMER, ALONG WITH APPLICABLE TAXES ON THOSE SURCHARGES. ALL STATE TAGS, TITLING AND REGISTRATION FEES, WITH THE EXCEPTION OF IRP TAGS.. The undersigned purchaser hereby offers to purchase from you, the Seller, for the state price, the truck(s) described below. DESCRIPTION MAKE MODEL TRUCK SERIAL NUMBER PHONE July 9, 2026 SUB TOTAL: Closing Fee SC IMF: SUBJECT TO THE TERMS AND CONDITIONS SET FORTH ON THE FACE AND REVERSE SIDE HEREOF: EMAIL FED ID INSURANCE CARRIER Isle of Palms Isle of Palms, SC 29451 CUSTOMER NAME SHEALY TRUCK CENTER SALES PROPOSAL TAG TRANSFER TAG CONDITION NEW PTAG NO 1303 Palm Blvd 843-886-8956 INCREASE IN PURCHASER PRICE. Purchaser agrees that if the cost of labor, materials, accessories or other equipment or component parts increases beyond the basis upon which the price set forth herein was established, the distributor at any time before delivery may give the purchaser written notice of such increase in price, and such increased price shall be the new contract price, unless Purchaser, within ten (10) days thereafter, provides Distributor with written notice of cancellation. This is Purchaser’s only right of cancellation. Any such increase in the contract price, pursuant to this provision, however, shall not prevent additional increases, if necessary, under the circumstances set forth herein at any time prior to delivery. It is understood and agreed that this Purchase Order sets the parties’ entire agreement with respect to the vehicle(s) to be purchased. All previous communications between Purchaser and Distributor, whether verbal or written, with reference to the purchase of the vehicle(s), are hereby abrogated, and Purchaser may not rely upon any such previous communications. Accordingly, Purchaser acknowledges that this Agreement contains the entire and complete understanding between the parties and that no modification of the Agreement shall be binding upon the Distributor unless such modification is in writing, and is agreed to and accepted in writing by an authorized officer or agent of the Distributor. WARRANTY BY PURCHASER. In the event that Purchaser has traded in one or more vehicles in connection with this purchase, Purchaser warrants that such vehicles are free and clear of all liens and/or encumbrances of any nature whatsoever and that Purchaser has good and marketable title to the vehicle(s) at the time of delivery thereof to distributor. Such vehicle(s) is to be delivered to the Distributor in the same condition and appearance in which it was when first inspected by the distributor or its agents or employees. The Distributor, upon the tender of delivery of such trade-in vehicle(s), shall have the right once again to inspect such vehicle(s), and the distributor shall be the sole judge as to its condition, with the right to accept or reject said trade-in vehicle(s) at its option. If such trade-in vehicle(s) is not in a condition and appearance as that existing when first inspected by the Distributor, the distributor shall have the right to revalue the amount of allowance offered for such trade-in vehicle(s), and the total cash purchase price shall be increased accordingly. The Purchaser agrees that the amount of the allowances made upon such trade-in vehicles(s), if any, is to be applied by the Distributor as part payment on the purchase price of the purchased vehicle(s). FINANCING THROUGH DISTRIBUTOR. In the event that Distributor provides financing to Purchaser or arranges for financing, purchaser acknowledges that this Purchase Order shall constitute the sole agreement between the parties with respect to the vehicle(s) purchased and the terms and conditions of sale. The {total} of the repayment of any financing shall be included within the documents to be executed in connection with such financing and are not made a part of this Purchase Order except as specifically stated therein. TERMS AND CONDITIONS EXPENSES OF DISTRIBUTOR. In the event of a breach by Purchaser of any of the terms and conditions of this Purchase Order, the Purchaser shall be liable for all of Distributor’s out-of-pocket costs including court costs, expenses and attorneys’ fees. PURCHASER UNDERSTANDS THAT ITS ORDER OF THE PURCHASED VEHICLE(S) MAY INCLUDE SPECIAL ORDER ITEMS NOT REGULARLY PROVIDED FOR SAID VEHICLE(S). IN SUCH EVENTS, DISTRIBUTORWILL INCUR INCREASED COSTS AND EXPENSES WHICH ARE, THERFORE, RELATED SOLELY TO PURCHASER’S PURCHASE AND FOR WHICH PURCHASER SHALL REMAIN LIABLE IN ALL EVENTS. ACCEPTANCE BY DISTRIBUTOR. Once the Purchase Order is executed by Purchaser and tendered for acceptance by Distributor, it will be binding only upon the execution hereof by Distributor TITLE RETENTION. Until such time as the Distributor has received, in full, the entire cash price for the purchased vehicle(s), all title(s) shall remain with Distributor and shall not pass to Purchaser until full payment and, to the extent not inconsistent, Distributor shall retain a security interest in such purchased vehicle(s) equal to the unpaid cash price for said vehicle(s). DEFAULT BY PURCHASER. In the event that the Purchaser shall fail to accept delivery of the vehicle(s) for any reason whatsoever (THIS BEING A NON-CANCELLABLE CONTRACT), Distributor shall have all remedies available at law or in equity including, without limitation, the following remedies: LIMITATION ON LIABILITY. The Distributor shall not be held responsible for any loss, damage, detention, delay or failure to deliver resulting from any cause which is unavoidable or beyond its reasonable control, including, but not limited to, fire, flood, natural disaster, strike or labor disturbance, accident, vandalism, riot, insurrection, war any order, decree, law or regulation of any court, government or governmental agency, shortage of materials, demand in excess of available supply, failure or interruption of normal transportation or power facilities; AND IN NO EVENT SHALL THE DISTRIBUTOR BE LIABLE FOR CONSEQUENTIAL OR INCIDENTAL DAMAGES INCLUDING, BUT NOT LIMITED TO, LOSS OF INCOME. Receipt of said vehicle(s) by the Purchaser upon delivery shall constitute a waiver of all claims for loss or damage due to delay. In executing this Purchase Order, Purchaser understands that the projected date is based, in part, upon circumstances outside of Distributor’s control and is based on a good faith estimate as to such events.

Source: City of Isle of Palms website. First collected Oct 26, 2026.