PROJECT : Palm Blvd Drainage Improvements REVISED: LOCATION : Old Village, Mt. Pleasant Isle of Palms, SC ESTIMATOR : HEA, MCV X SCDOT ITEM NO. DESCRIPTION NUMBER OF UNITS UNIT MEASURE PER UNIT TOTAL COST 1031000 Mobilization 1 LS 200,000.00 $ 6011000 Traffic Control 1 LS 100,000.00 $ 1050800 Construction Stakes, Lines & Grades 1 LS 65,000.00 $ - As-built Construction Plans 1 LS 20,000.00 $ 2011000 Clearing and Grubbing within Right-of-Way 1 LS 20,000.00 $ 2023000 Removal & Disposal of Existing Pavement 455 CY 60.00 $ 27,300.00 $ 2106000 Selected Removal of Marked Trees 14 EA 1,500.00 $ 21,000.00 $ 3050108 Graded Aggregate Base Course 726 SY 50.00 $ 36,300.00 $ 4013990 Milling Existing Asphalt Pavement 3,488 SY 15.00 $ 52,320.00 $ 4020320 Asphalt Base Course Type B 82 TON 225.00 $ 18,450.00 $ 4040320 Asphalt Surface Course Type B 393 TON 225.00 $ 88,425.00 $ 6271010 4" White Solid Lines (Pvt. Edge Lines) Thermoplastic - 90 mil. 2,100 LF 4.00 $ 8,400.00 $ 6271015 8" White Solid Lines (Crosswalk) Thermoplastic - 125 mil. 205 LF 6.00 $ 1,230.00 $ 6271025 24" White Solid Lines (Stop/Diag Lines) Thermoplastic - 125 mil. 24 LF 25.00 $ 600.00 $ 6271074 4" Yellow Solid Lines (PVT. Edge Lines) Thermoplast ic - 90 mil. 860 LF 4.00 $ 3,440.00 $ - 6" Sewer Service & 12" Steel Casing 18 LF 1,500.00 $ 27,000.00 $ - Water Service 1 EA 4,500.00 $ 4,500.00 $ - 8" PVC 37 LF 550.00 $ 20,350.00 $ - 12" PVC 76 LF 600.00 $ 45,600.00 $ - 14" PVC 337 LF 650.00 $ 219,050.00 $ - Hydrant Assembly 1 EA 12,000.00 $ 12,000.00 $ - 14" x 12" Reducer 1 EA 1,800.00 $ 1,800.00 $ - 12" x 8" Tee 1 EA 1,400.00 $ 1,400.00 $ - 14" x 12" Reducer 1 EA 1,500.00 $ 1,500.00 $ - 14" x 14" Tee 1 EA 1,600.00 $ 1,600.00 $ - 8" 45 Degree Bend 3 EA 1,800.00 $ 5,400.00 $ 8" 90 Degree Bend 1 EA 2,000.00 $ 2,000.00 $ - 12" 45 Degree Bend 2 EA 2,500.00 $ 5,000.00 $ - 14" 22.5 Degree Bend 2 EA 2,800.00 $ 5,600.00 $ - 14" 45 Degree Bend 6 EA 2,800.00 $ 16,800.00 $ - 8" Gate Valve 1 EA 8,500.00 $ 8,500.00 $ - 12" Gate Valve 1 EA 10,000.00 $ 10,000.00 $ 7141118 38" x 60" RCEP (Class III) 835 LF 900.00 $ 751,500.00 $ 7191205 Catch Basin - Type 9 2 EA 10,000.00 $ 20,000.00 $ 7192020 Drop Inlet (24" x 36") 6 EA 8,000.00 $ 48,000.00 $ 7192105 Manhole 1 EA 12,000.00 $ 12,000.00 $ 7192110 Junction Box 2 EA 10,000.00 $ 20,000.00 $ 7204100 Concrete Sidewalk 144 SY 100.00 $ 14,400.00 $ 7204900 Detectable Warning Material 20 SF 40.00 $ 800.00 $ 7205000 Concrete Driveway 215 SY 150.00 $ 32,250.00 $ 8041020 Rip Rap (Class B) 80 TON 200.00 $ 16,000.00 $ 8048205 Geotextile for Erosion Control Under Riprap (Class 2) Type B 110 SY 40.00 $ 4,400.00 $ 8131000 Sodding 6.1 MSY 12,000.00 $ 73,200.00 $ - Misc. Erosion Control/Water Management 1 LS 65,000.00 $ SUBTOTAL 2,108,115.00 $ Contingency at 10.0 % 210,900.00 $ 210,900.00 $ GRAND TOTAL OPINION OF CONSTRUCTION COST $2,319,100 (Other) QUANTITY COST OPINION OF PROBABLE CONSTRUCTION COST DATE PREPARED : 07/15/2025 BASIS FOR ESTIMATE (No design completed-Master Plan) (Preliminary design - 50% Design Level) (Final design - 95% level) OPINION OF PROBABLE CONSTRUCTION COST Since the Engineer has no control over the cost of labor, materials, equipment, over the Contractor's methods of determining prices, or over competitive bidding or market conditions, the Opinions of Probable Construction Costs provided for herein are made on the basis of his experience and qualificat ions. These opinions represent his best judgment a s a design professional familiar with the construction industry. However, the Engineer canno t and does not guarantee that proposals, bids, or t he construction cost will not vary from Opinions of Probable Construction Costs prepared by him. Thomas & Hutton Sheet 1 of 1

Source: City of Isle of Palms website. First collected Oct 26, 2026.