TRC Minutes 10.01.26 Page 1 of 5
TECHNICAL REVIEW COMMITTEE MINUTES
Thursday, October 1, 2026 – 10:00 A.M.
Training Room/Zoom
NEW APPLICATIONS
CR-26-47: Courtesy Review – Joining 2706 South Ocean Boulevard and 2712 Perrin Drive
Attending
Customer
Representatives:
Dave DeLorenzo, Applicant
Staff Comments
Public Works: 1. Need site plan for review.
2. Driveway placement/spacing subject to review.
3. Parking area subject to review.
Zoning: 4. Need proposed floorplan.
5. Need survey of 2712 Perrin for permitting.
6. Need scaled drawing for proposed plot plan.
Building: 7. Architectural and engineering plans are required for combining the structures.
Fire: 8. Provide a fire apparatus turning exhibit to confirm that emergency vehicles can
access all areas of the site.
9. Based on the proposed occupancy/load, additional fire protection systems (e.g.,
sprinklers, fire alarm) may be required. Revise plans to demonstrate compliance
with applicable code provisions.
Planning: 10. Need site plan for review.
SUB-26-52: Major Preliminary Subdivision Plat – Cherry Grove Subdivision – Ye Olde Kings Highway
Attending
Customer
Representatives:
Brandon Truesdale, Engineer
Staff Comments
Public Works: 1. Shift sewer to the center of a travel lane, not the centerline of the road, per the
City’s Roadway Design Manual.
2. Pump station – Upgrades will be required, engineer to review and coordinate
upgrades with the City's Utilities Operation Manager, Ricky Bellamy.
3. Show a 15-foot public utility easement, centered on the new sewer line that
crosses lots 26, 2 & 3.
4. Water service on lot 1 should tie-in to the water main in front of the lot.
Should not cross through lot 2.
5. Label the actual vertical clearance dimensions at pipe crossings on profiles.
6. Add drainage easements to cover the rear yard swales.
7. No water quality on the swales draining towards the marsh.
8. No water quality shown on stormwater draining into the pond.
9. Move JB-22 out of the sidewalk.
10. Showing sumps in some catch basins, and none in others. Please show all
boxes with a 6” sump.
TRC Minutes 10.01.26 Page 2 of 5
11. Minimum RCP diameter should be 18” for storm pipes that are to be public.
(showing 15” in places).
12. How does water leave the existing pond? Is there a spillway to the marsh? If so,
show on plans.
13. Adjust limits of disturbance line to include storm pipe outlet to pond. Adjust
silt fence accordingly.
14. If the existing pond is going to require maintenance and/or clean up, extend
the limits of disturbance to encompass that area.
15. Dimension the tie-in radii at the entrance.
16. Add vertical curves to the roadway profile.
17. Additional comments may be forthcoming pending further review or receipt of
revised documents.
Zoning: 18. Please show trees on the subdivision plat.
19. Please confirm all lots are at least 50' wide at the front setback line.
20. Please confirm that all lots are at least 6000 square feet.
21. Please shift driveway on lot 19 to side property line. Tree protection.
22. Possible gravel drive lots 14-16. Tree protection.
23. Lot 18 26" Laurel Oak. BZA or Arborist's letter recommending removal due to
tree health.
24. Lot 18 shift driveway to side away from 24" Laurel Oak.
Building: 25. Lots 15,16 and 17 to be designed and built to the Coastal High Hazard V flood
zone standards due to FEMA LiMWA line.
Fire: 26. Fire hydrants are to be spaced along the roadway so as the travel distance
between hydrants does not exceed 600 ft.
27. Provide a fire apparatus turning exhibit to confirm that emergency vehicles can
access all areas of the site.
28. Provide a fire apparatus turning exhibit to confirm that emergency vehicles can
access all areas of the site.
Planning: 29. Show edge of payment on the plat.
30. Extend Seaside Drive through the development.
31. Include smallest and largest lot size in site data table on plat.
32. Label easements between lot 5 & 6 and 9 & 10.
33. Minimum of five types of native trees shall be planted for a tree count between
20-100 for street tree plantings.
34. Per Sec. 20-47, provide a minimum 20-foot water quality buffer around
wetlands.
35. Just a note on the wetland buffer above: All wetlands proposed to remain on a
site shall be surrounded with a minimum 20-foot water quality buffer, within
which no building construction shall occur. These areas shall be in common
ownership, and shall remain naturalized, with the exception that a multipurpose
path not exceeding ten (10) feet in width may be constructed within them. Such
paths may be utilized for recreation, and/or access for maintenance equipment.
Z-26-26: Major PDD Amendment – 14 Single-Family Units - North Beach Plantation Phase 3 Tower
Attending
Customer
Representatives:
Cameron Parker, Engineer and Robert Guyton, Attorney
TRC Minutes 10.01.26 Page 3 of 5
Staff Comments
Public Works: 1. Refer to Sec 23-29 for PDD submittal requirements.
2. A master site plan shall contain the following information: The approximate
location and sizes of existing and proposed sanitary and storm sewers, water
mains, culverts, and other underground facilities in or near the project on a
topographic map using contour lines at appropriate intervals.
3. Shift sewer to the center of a travel lane, not the centerline of the roadway per
the City’s Roadway Design Manual.
4. Shift waterline from under curb.
5. Address storm drainage new street.
6. See the NMB Street Planning Manual for new street requirements.
7. Specify type of street (private street or driveway)
8. Stormwater design per city stormwater design manual.
Zoning: 9. What is the minimum separation between homes?
10. 8.5' shown between with 5' HVAC platforms means only 3.5' separation
available.
11. Landscape plan?
12. Signage?
Building: 13. 8.5 ft separation between structures requires UL 1hr fire wall on each unit.
14. 10ft between units would omit fire rating, then 1hr rate overhang encroaching
in 10ft building separation.
15. 12ft between units, no fire rated requirements.
Fire: 16. Fire hydrants shall be spaced in accordance with City standards (maximum
spacing measured along the roadway). Provide a dimensioned exhibit
demonstrating compliance.
Planning: 17. Provide a continuous, accessible pedestrian connection between the public
sidewalk and the primary building entrances. Revise the site plan to clearly show
the route and associated improvements.
18. We may be able to include this on the 11/10 planning commission meeting, but
too many corrections are required to make it on the 10/20 agenda.
CR-26-50: Courtesy Review – Six-Sleeping Area at 502 South Ocean Boulevard
Attending
Customer
Representatives:
Mark Donevant, Engineer
Staff Comments
Public Works: 1. Will need to meet or exceed the 25 year – 24-hour rain event with tie-in to the
existing storm system. If no tie-in to an existing system is available will need to
hold the 100 year – 24-hour storm event.
2. Any work in the Ocean Blvd or 5th Ave S rights-of-way will require SCDOT
encroachment permit(s).Work in Miller Ln. right-of-way will require a City of
NMB encroachment permit.
3. Engineer to determine water meter size needed. All water
service/irrigation/fire lines will require an SCDES approved backflow device.
4. Recommend driveway access from Miller Ln.
5. Address pool discharge location.
6. Show sewer service/clean-out location.
TRC Minutes 10.01.26 Page 4 of 5
Zoning: 7. Revise driveway. Dust free all-weather materials such as concrete or asphalt are
needed for the driveway to meet commercial standards.
8. Add additional back out area for vehicles parked under the house to the right
side of the driveway as viewed from the street.
9. Pull back the vinyl fence for safety viewshed along Miller.
Building: No comments
Fire: No comments
Planning: No comments
CR-26-51: Courtesy Review – Six-Sleeping Area at 500 South Ocean Boulevard
Attending
Customer
Representatives:
Mark Donevant, Engineer
Staff Comments
Public Works: 1. AE flood zone: all buildings shall be elevated so the lowest floor is located not
less than twelve inches above the level of base flood. Will require a finished
construction elevation certificate.
2. Will need to meet or exceed the 25 year – 24-hour flood event with tie-in to the
existing storm system. If no tie-in to an existing system is available will need to
hold the 100 year – 24-hour storm event.
3. Any work in the Ocean Blvd or 5th Ave S right-of-way will require SCDOT
encroachment permit(s). Work in Miller Ln. right-of-way will require a City of
NMB encroachment permit.
4. Engineer to determine water meter size needed. All water/irrigation/fire
services will require an SCDES approved backflow device.
5. Recommend driveway access from Miller Ln.
6. Address pool discharge location.
7. Show sewer service/clean-out location.
Zoning: 8. Pull back vinyl fence for safety viewshed along street.
9. Dust free all-weather surface required for drive aisles.
10. Add back out area on side for vehicles under home.
Building: No comments
Fire: No comments
Planning: No comments
TRC-26-23: Site-Specific Development Plan – Compass Resort at 1717 South Ocean Boulevard
Attending
Customer
Representatives:
Cameron Parker, Engineer
Staff Comments
Public Works: 1. Parking lot 3 has poor circulation and needs to be re-configured. Long dead
end with no-turn around. Recommend removing an entrance from Perrin Dr.
and relocating it to Holly Dr. so that it is aligned with 18th Ave S. intersection.
2. The single parking stall in parking lot #2 could potentially be blocked when a
car parks in the adjacent space to the left.
3. Verify recommended throat lengths at all parking lot driveways per SCDOT
ARMS manual Section 3B-4.
TRC Minutes 10.01.26 Page 5 of 5
4. Verify compactor pad dimensions/appurtenances meets minimum city
standards.
5. Provide sewer manhole at property line for sewer service line tie-in.
6. Provide SCDES approved backflow at the potable water meter.
7. Provide approved SCDOT encroachment permits prior to final site plan sign-
off.
Zoning: 8. Comments pending.
Building: 9. Previous comment addressed.
Fire: No comments
Planning: No comments