BAR-L Public Comment
City of Charleston · Berkeley County · meeting of Jul 8, 2026 · Agendas
Open the original document More from City of Charleston
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CITY OF CHARLESTON
BOARD OF ARCHITECTURAL REVIEW – LARGE
PUBLIC COMMENT
JULY 8, 2026
A meeting of the Board of Architectural Review – Large (BAR -L) will be held on Wednesday,
July 8, 2026 at 4:30 p.m. in the Public Meeting Room, First Floor, 2 George Street.
The following written comments will be provided to the board members 24 hours in advance of the
meeting. The comments will also be acknowledged into the record and summarized. The public is
encouraged to attend the meeting in person to speak in order for comments to be fully heard.
Application information is available at www.charleston-sc.gov/bar. Please check the website on the
meeting date to view any withdrawn or deferred agenda items.
For additional information, please contact:
Department of Planning & Preservation | 843-724-3781
B. APPLICATIONS
1. 35 Bee Street
BAR2026-002699 | TMS #4601501043 | Medical Complex | Council District 6
New Construction | Height Districts 55/30S, 85/30, 85/125 | Old City District, Medical
District Overlay
Requesting Approval of a mockup panel.
Owner: Medical University of South Carolina (MUSC)
Applicant: Liollio Architecture
NOTE: The Board will convene at this address on Tuesday, July 7, 2026, at
8:30 a.m. for a site visit.
No Comments Submitted
2. 106 Coming Street
BAR2026-002703 | TMS #4601603017 | Radcliffeborough | Council District 4
New Construction | Height Districts 4, 8 | Old City District
Requesting Conceptual Approval of a student housing building.
Owner: College of Charleston
Applicant: Liollio Architecture
28 Comments Submitted:
• Thomas Orth, Charleston
Submitted to Staff
See attached letter.
• 27 Comments Submitted to Innovate Site
See attached comments.
Board of Architectural Review – Large
Public Comment | July 8, 2026 Page 2
3. 989 Morrison Drive
BAR2026-002706 | TMS #4590101001 | East Central | Council District 4
New Construction | Height District 4-12 | Historic Corridor District
Requesting Conceptual Approval of a new multi-family building.
Owner: Scott Fuller (representative)
Applicant: Brad Brown
18 Comments Submitted:
• 18 Comments Submitted to Innovate Site
See attached comments.
4. 48 & 52 Line Street
BAR2026-002700 | TMS #4590503136, 4590503139
Cannonborough/Elliottborough | Council District 8 | New Construction
Height District 8 | Old and Historic District
Requesting Revision to Conceptual Approval and Preliminary Approval of two (2) mixed-
use buildings.
Owner: LL East LLC
Applicant: Kevin Smith (Robert A.M. Stern Architects)
7 Comments Submitted:
• 7 Comments Submitted to Innovate Site
See attached comments.
5. 251 King Street
BAR2026-002690 | TMS #4570801052 | Downtown | Council District 4
Category 2 | c. 1880’s | Height Districts 3, 6 | Old and Historic District
Requesting Conceptual Approval of exterior alterations and illuminated signage.
Owner: Peter Demetre
Applicant: Bill Marshall
4 Comments Submitted:
• Chip Ervin, Grady Ervin & Co.
Submitted to Staff
See attached letter.
• Casey Lavin, Beemok Hospitality Collection
Submitted to Staff by Bill Marshall
See attached letter.
• Historic Charleston Foundation
Submitted to Staff by Bill Marshall
See attached letter.
• Preservation Society of Charleston
Submitted to Staff by Bill Marshall
See attached letter.
Board of Architectural Review – Large
Public Comment | July 8, 2026 Page 3
6. 134 Saint Philip Street
BAR2026-002672 | TMS #4601202038 | Radcliffeborough | Council District 4
Category 3 | c. 1887 | Height Districts 2.5-3, 4 | Old City District
Requesting Final Approval of an exterior lighting package.
Owner: Father Johnbosco Ikemeh (St. Patrick Catholic Church)
Applicant: David Hill (Innova Architecture)
1 Comment Submitted:
• Preservation Society of Charleston
Submitted to Staff
See attached statement.
7. 200 Meeting Street
BAR2026-002694 | TMS #4580503001 | Downtown | Council District 8
Not Rated | c. 1991 | Height Districts 3.5, 4 | Old and Historic District
Requesting Final Approval of a signage package containing illuminated signage.
Owner: Fourthline Capital Management LLC
Applicant: Paul Dalesandro (Rise Above Signs & Graphics)
No Comments Submitted
Other Comments
• Hallie Seibels, 34 Rutledge Avenue
Submitted on Innovate Site July 6, 2026 6:14 PM
Stop the development. I vote no
CITY OF CHARLESTON
BOARD OF ARCHITECTURAL REVIEW – LARGE
106 Coming Street
BAR2026-002703 | TMS #4601603017 | Radcliffeborough | Council District 4
New Construction | Height Districts 4, 8 | Old City District
Requesting Conceptual Approval of a student housing building.
Owner: College of Charleston
Applicant: Liollio Architecture
Wednesday, July 8, 2026
Public Comment BAR Application
#2 106 Coming Street
New Construction
It's premature for the Board of Architectural Review to
take any action on the proposed architectural
aesthetics for the 106 Coming Street project site.
There has been inadequate consideration and
engagement with African and Indigenous
Communities. There has been no information for the
public about how immorally thousands of Negroes
and Strangers are buried at this site.
Thomas Orth
B.S., M.Ed.
Citizen of Charleston
CITY OF CHARLESTON
BOARD OF ARCHITECTURAL REVIEW – LARGE
106 Coming Street
27 Comments Submitted
5 Comments in Support | 22 Comments Requesting Deferral or in Opposition
First Name Last Name Address Submitted Comment Date/Time
Submitted
5 Comments in Support
Joe McGee 1 Magazine
Street
Dear Chair and members of the Board, I write in
qualified support of the College of Charleston’s 106
Coming Street Commons proposal. Similar to the
Radcliffeborough Neighborhood, our neighborhood
understands the daily pressures created when
student housing demand is absorbed by residential
streets: parking competition, late-night behavior,
absentee ownership, and the conversion of family
housing into student rentals. For that reason, we
support the College’s effort to house more students
on campus and align with Radcliffeborough’s view
that this project can improve neighborhood livability.
At the same time, support should not be understood
as unconditional approval of the design before you.
This is an unusually sensitive site. The burial-ground
history must be treated as central to the project, not
as a secondary interpretive feature added after
design decisions are made. The College should be
expected to demonstrate that archaeological
findings, commemoration, and community
engagement have meaningfully shaped the plan. We
also ask the BAR to require greater sensitivity to
scale, massing, setbacks, and streetscape character
along Coming and Vanderhorst. A student residence
can serve an important public purpose and still fail if
it overwhelms the adjoining neighborhood. The
College of Charleston and Charleston’s historic
neighborhoods are intertwined. The College benefits
from the character of these neighborhoods, and it
has a corresponding responsibility to strengthen, not
diminish, that character. I urge the Board to
shepherd this project forward only with clear
conditions: a more sympathetic scale, a completed
and credible burial-ground treatment plan, and a
design that reflects the full historical significance of
the site. Joe McGee, President, Harleston Village
Association
Jul 7 2026
11:42AM
Elizabeth Soule
Brainard
Warren Street I am writing in support of the College of Charleston’s
BAR proposal for the student housing at the 106
Coming/99 Vanderhorst Streets site, known as
Jul 1 2026
11:32AM
Board of Architectural Review – Large
106 Coming Street Page 2
Coming Street Commons. The College has kept
Radcliffeborough Neighborhood Association (RNA)
appraised of the project since at least April 2023.
They have been forthright about the heights along
Coming and Vanderhorst streets, and were
supportive of our requests for setbacks and step ups
to minimize mass closest to residential homes. RNA
appreciates the need for additional student housing
and our members have consistently supported the
return of neighborhood housing stock to non-student
occupants. RNA believes that Coming Street
Commons will greatly advance this goal. Please do
not hesitate to reach out should you need additional
information. You may also learn more about us by
visiting www.RadcliffeboroughSC.org.
Patrick DeMarco 1430 Brian Rd,
Charleston, SC
29407
I write in support of the College of Charleston's
application and plans. This student housing is
desperately needed, and will help alleviate housing
demand (and hopefully costs) in the surrounding
neighborhoods. In a fully-developed, thriving city,
every new development poses trade-offs, and we
must consider the most urgent problems at all times.
While we all want to honor burial grounds and the
deceased generations before us, I would argue that
the living should be the focus. I am confident the
college will do right with transfers of bodies and
signage commemorating the site, and this project is
far too important to languish in delays, reviews, etc.
I encourage the board to approve this project
without delay.
Jul 2 2026
12:33PM
Justin Moffitt 29403 I support this project. It is well designed. Jul 2 2026
3:33PM
Zac Viscidi 59 Cypress St The College of Charleston is a storied institution that
is older than our own nation. It will outlive all of us,
and it possesses the ability to sensibly and sensitively
develop this plot. There are significant concerns, but
the College is more adequately prepared than most
entities to address them. The city should be
supportive of its largest and most important
institutions. Encouraging a nice public space to
honor those individuals who were buried in this plot
is totally feasible and can be accomplished.
Jul 3 2026
9:23PM
Continued on Page 3
Board of Architectural Review – Large
106 Coming Street Page 3
22 Comments Requesting Deferral or in Opposition
Stephen Ziff 8 Legare St This project is contrary to the BAR's commitment to
protect Charleston's historic resources.
Jul 2 2026
1:34PM
Joseph R Faraguna 5 Gadsdenboro
#306 Charleston
SC 29401
Greetings thank you for the opportunity to put my
“two cents” in. I’ll give you a little of my background
for what it’s worth and to show where I’m coming
from. Born in Queens and raised in Brooklyn and I
live in Charleston, which is a small version of
Brooklyn - waterfront, the ability to walk
everywhere, history and culture. History! I
graduated West Point and New York University and
was a soldier and then an Army Lawyer. I am very
much into America. I am fortunate that I was born
here. I am fortunate that I live here. Like most I
respect our history and our heritage. I find it hard to
believe that we’re even having this discussion and
that the College Of Charleston of all entities is
seeking to interfere with a historic gravesite. Am I
missing something? I think that mindset would
takeoff and for example, my hometown of New York
City has so many ancient graveyards on prime Real
Estate. - well maybe we should start ondoing all the
grave sites. More profitable $$$. It’s disappointing
that some people are trying to “do this” and there’s
this underlying attitude and approach toward parts
of our culture. Parts that we should respect not
denigrate. Leave this graveyard alone and apologize
please! Bobby Joe Faraguna (631) 514-5547
Jul 2 2026
2:19PM
Isabel Warner Wagner Terrace Reject the request based on the fact that the
property would lay on top of a burial ground.
Jul 2 2026
2:51PM
Nicolas Pasanella 127 Westworth
Street
I live in a Charleston single on Wentworth and am
proud of our neighborhood. This particular design
completely and utterly overwhelms the
neighborhood and is far too large and dense. I fully
support C of C as a valued neighbor but absolutely
object to this proposed building. Slowly the "feel" of
Charleston is being bitten away bite by bite through
enormous non contextual architecture. I am an
architect and a developer but this is a bridge too far.
I urge you to reject this proposed project
Jul 2 2026
3:12PM
Jennifer B. 55419 The presence of this burial ground is relevant to the
Board’s duty to ensure that new construction is
sympathetic to the historic features that characterize
the site’s setting and context. The BAR should defer
review unless and until it has a more complete
understanding of site conditions. This process
cannot be rushed given the site’s sanctity.
Community-led commemorative projects — from the
African Burial Ground in New York City to
Contrabands & Freedmen Cemetery in Alexandria,
Va. — demonstrate the time and engagement
Jul 2 2026
12:53PM
Board of Architectural Review – Large
106 Coming Street Page 4
required to do this work responsibly.
Laura Isenstein 4 Beaufain St
Unit 206
The presence of this burial ground is relevant to the
Board’s duty to ensure that new construction is
sympathetic to the historic features that characterize
the site’s setting and context. The BAR should defer
review unless and until it has a more complete
understanding of site conditions. This process
cannot be rushed given the site’s sanctity.
Community-led commemorative projects — from the
African Burial Ground in New York City to
Contrabands & Freedmen Cemetery in Alexandria,
Va. — demonstrate the time and engagement
required to do this work responsibly. IT’s time for C
OF C to STOP ENCROACHING UPON THE LIVIBILITY OF
SURROUNDING NEIGHBORHOODS! ENOUGH TOWN
AND GOWN! The City MUST SEND A CLEAR MESSAGE
NOW! Look for land to DEVELOP A SATELLITE
CAMPUS OFF THE PENINSULA! NEXT FIGHT -
WENTWORTH GARAGE PROPERTY!
Jul 3 2026
9:56AM
Ruth Miller 169 Manchester
Road
What you see is what you remember. What you don't
see can be much more important. The past is literally
buried by the present. Such is the situation in historic
Charleston’s burial grounds. By 1710 the majority of
people walking Broad St. were enslaved Africans or
African-Americans. Into the 1960s the majority of
people walking Calhoun Street were African-
Americans. And how do we remember those of our
18th and 19th century city - exploring their
graveyards. Charleston has more 18th century burial
grounds than any city in America. Yet what is
missing? No African-American is buried in any of
them. In a city built by black hands with the wealth
earned by plantation slaves, only white church
members are buried in their cemeteries. Some
congregations had more enslaved and free people of
color in their balconies than sitting in the pew boxes
below, yet nary a one was interred in the churchyard.
There is documentation the site at 106 Coming St.
holds the remains of thousands. Not just the
enslaved, also the remains of the poor, the strangers,
folks of any ethnicity, real people who were cast
aside at their death by the living society because
these people were not "important" enough or rich
enough or white enough for our churchyards. The
site at 106 Coming St. gives us, today, the
opportunity to honor "We the people" who built
America. The land should allow nothing but a park
established by the living to honor the dead!
Jul 3 2026
11:32AM
MEREDITH HOFFORD 2 LAURENS ST,
CHARLESTON
29401
PLEASE ACKNOWLEDGE, SOMEHOW, THOSE BURIED
HERE. PLEASE IMPROVE THE AESTHETICS OF THE
BUILDING.
Jul 3 2026
12:58PM
Board of Architectural Review – Large
106 Coming Street Page 5
Renee Webb 99 King St I respectfully oppose this project and urge the Board
to deny conceptual approval. No development
should disturb or excavate this historic burial ground.
The College of Charleston should pursue an
alternative locatio inn or design that preserves the
site and honors those buried there. This project is
also premature for design review. The archaeological
investigation should be completed before any
conceptual approval is considered so the site’s full
historical significance can guide future decisions.
Jul 4 2026
7:43PM
James Newhard 8506 William
Moultrie Drive,
North
Charleston, SC
29420
I write to request that the Board defer conceptual
approval of the proposed student housing
development at 106 Coming Street. I am a Registered
Professional Archaeologist with more than 20 years’
professional experience, Vice President of the
Charleston Society of the Archaeological Institute of
America, Director of the Center for Historical
Landscapes, former Director of the Archaeology
Program at the College of Charleston, and a member
of the College’s Community Engagement Council. I
write solely in my individual capacity and not on
behalf of the Council, the College, or any other
organization. I am not asking BAR-L to assess
archaeological methods, the treatment of human
remains, or the broader question of whether
development should occur on this property. I am
asking the Board to exercise its own responsibility
over new construction in Charleston’s historic urban
fabric. The City’s Charleston Standards provide that
new construction should be sympathetic to the
historic features that characterize its setting and
context and should respect the setting’s size, scale,
proportions, and massing. The questions raised by
this application – where the building is placed, how
development is phased, what spatial hierarchy
governs the block, and what physical weight is given
to commemoration – therefore fall squarely within
BAR-L’s review. The applicant’s own materials
establish the extraordinary sensitivity of this setting.
Liollio’s submission maps approximately 51,630
square feet of the 64,995-square-foot project site as
overlapping the recorded limits of Charleston’s
1790s–1807 municipal burial ground. The applicant’s
commissioned historical research further concludes
that the Project Area may retain a higher degree of
historic integrity than more heavily developed
portions of the cemetery. This burial ground
received people among the most marginalized by
Charleston’s social order: enslaved people, free
people of color, people of Indigenous ancestry, the
poor, strangers, sailors, orphaned children, and
others excluded from more privileged forms of
Jul 5 2026
11:13AM
Board of Architectural Review – Large
106 Coming Street Page 6
burial. The applicant’s own historical research goes
further. BVL concludes that Africans who survived
the Middle Passage but died after reaching
Charleston – while confined aboard ships or in
dockside facilities awaiting sale – were likely interred
here. Some reached Charleston alive and died while
awaiting sale. Its history, therefore, reaches beyond
Charleston into the Atlantic world and the human
consequences of the transatlantic slave trade. For a
site carrying that history, conceptual approval should
follow, not precede, meaningful public testing of the
concept. The applicant’s submission points to public
meetings in 2025, monthly CEC meetings, a May
2026 CEC presentation, and the June 2 design
charrette. But a chronology of meetings is not
evidence of substantive consultation on architectural
design. Substantial portions of the 2025 meetings
focused on whether this project should proceed at
all. The architecture now before BAR-L was not their
principal subject. Meetings debating on whether to
build cannot later be counted as consultation on how
to build. Opposition to the project is not design
consultation. Nor are monthly CEC meetings
equivalent to monthly architectural consultation. The
CEC is an advisory body, not a proxy for the broader
public or for descendant, tribal, and affiliated
communities. At Liollio’s May 2026 presentation, I
understood the firm to have treated engagement
with the CEC as engagement with community
representatives. That assumption is consequential:
CEC members bring important knowledge and
community relationships, but the Council cannot
substitute for direct engagement with the
communities connected to this site. The June 2
charrette did not cure that problem. At the June 4
CEC meeting, College representatives explained that
notice had been sent to CEC members and to people
who had already subscribed for project updates.
According to that explanation, notice was not
broadly distributed even across the College
community. A design charrette promoted principally
to an already self-selected audience is targeted
outreach, not broad public notice. In my observation,
attendance was correspondingly concentrated
among people already deeply engaged in the
controversy. Liollio’s substantive presentation of
architectural and commemorative concepts to the
CEC occurred in May 2026. The discussion surfaced
unresolved questions about whether quiet
contemplation is realistic beside undergraduate
housing, whether commemorative space would
remain meaningfully accessible to the public, how
Board of Architectural Review – Large
106 Coming Street Page 7
Indigenous histories are represented, and whether
commemoration can genuinely respond to
community concerns when the building program
itself is treated as fixed. This is the central process
problem. The submission invokes “engagement” to
validate design choices that the cited process did not
consistently place before the broader public for
meaningful consideration. Attendance is not
consultation. An advisory council is not the public.
Iterations of one preferred scheme are not
alternatives. The proposed site planning and phasing
raise an even more serious concern. The applicant’s
own commissioned historical research documents
that this was not an undifferentiated burial ground.
An 1801 City ordinance required segregation. A
northern section, not exceeding one acre, was
reserved for free white persons, strangers, and
foreigners; the remainder was assigned to enslaved
people and people of color. BVL Historic Preservation
Research appropriately identifies the reconstructed
location of the partition fence as approximate. Yet
BVL also states that the southern section of the
property and Project Area served as the final resting
place for a substantial number of enslaved
individuals. Liollio’s own plans must be read against
that history. The submitted site strategy places Phase
I predominantly in the southern portion of the parcel
while identifying land to the north for “Future
Student Housing.” The same submission leaves
approximately 13,365 square feet – about one-fifth
of the project site – outside the mapped cemetery
overlap. That is not proof of improper intent. It is a
design choice requiring explanation. The Board need
not determine the exact position of an eighteenth-
century fence to ask a straightforward design
question: what alternative massing and phasing
schemes were tested to prioritize development
outside the recorded cemetery footprint and reduce
early construction pressure on the portion of the
burial ground that the applicant’s own research
associates with enslaved people, people of color, and
African captives who died after reaching Charleston
while awaiting sale? Uncertainty about the fence
line is not a reason to disregard the cemetery’s
documented racial geography. It is a reason to plan
more cautiously. Before conceptual approval, the
applicant should show what materially different
phasing and massing options were evaluated,
including options that shift development toward land
outside the mapped cemetery overlap. It should
explain why those alternatives were accepted or
rejected and demonstrate when and how affected
Board of Architectural Review – Large
106 Coming Street Page 8
communities were meaningfully engaged in
evaluating them. Without that record, the current
plan invites an obvious and damaging question: why
does Phase I begin predominantly in the section
reserved by ordinance for enslaved people and
people of color while other land is deferred for
future development? That question belongs before
conceptual approval, not after it. The proposed
commemorative strategy raises a related concern.
The Phase I plan labels a principal cemetery-related
element the “Ancestral Spine,” organized as a linear
passage along the southern edge of the building,
together with areas identified as “Healing +
Reflection” and a “Mural Wall.” Elsewhere, the
presentation invokes historic Charleston alleys as
architectural precedents. But typological fit is not
the same as commemorative adequacy. An alley can
be historically Charlestonian and still be the wrong
urban form for this site. This is not an incidental
interpretive feature to be fitted around a 608-bed
undergraduate residence hall. The burial ground links
Charleston’s marginalized dead to the Atlantic slave
trade and to a system of coerced labor that
generated extraordinary wealth in this city and
beyond. Its significance is local, national, and
transatlantic. The architecture should give that
history spatial weight. A narrow contemplative strip
beside undergraduate housing risks turning
commemoration into mitigation rather than an
organizing principle of the public realm. The relevant
question for BAR-L is whether the proposed public
realm is proportionate to the historic meaning of the
place and whether it provides adequate scale,
dignity, public access, visibility, and solemnity. In my
view, it does not. When the residence hall organizes
the block and the burial ground’s commemoration is
fitted around its edge, the spatial hierarchy is
backward. I therefore respectfully request deferral
until the applicant completes a genuinely design-
focused public process, broadly noticed beyond an
existing list of project subscribers. That process
should test materially different site-planning
alternatives, not successive iterations of a preferred
scheme, and should document what feedback
changed, what was rejected or retained, and why.
The applicant should return with a master plan that:
1. meaningfully tests alternative phasing and
massing, including options that prioritize land outside
the mapped cemetery overlap, 2. accurately
distinguishes the CEC’s advisory role from broader
public and descendant engagement, and 3. provides
commemorative space commensurate with the
Board of Architectural Review – Large
106 Coming Street Page 9
magnitude of the site. Deferral would not decide the
ultimate fate of the project. It would recognize that
these questions are not details to be resolved after
the concept is approved. The siting, massing,
phasing, circulation, and spatial hierarchy are the
concept. This is the moment when meaningful
alternatives should be tested. At present, the
architecture has moved ahead of the engagement
process. On a site carrying this history, that sequence
should be corrected before the Board grants
conceptual approval.
Harlan Greene 32 Chapel Street,
Charleston, SC
If goals of the BAR are to protect historic resources
and to establish amenable design standards, this
proposal should not be allowed to proceed in any
manner. It is a well-known fact that this is a
gravesite of national importance, and any building,
no matter its excellence, would be a desecration; the
current design is out of scale with its neighbors, and
its use is incompatible with the neighborhood -- a
quiet residential one, and one were thousands rest.
The owner of the property can find other options to
build a dormitory and even has a current dormitory
site on Calhoun Street that it will demolish and not
use as a dorm. While it is beyond the ken of the BAR,
members should know that Federal Law about
indigenous burials on the site may keep the site
under litigation for years. As time passes and
budgets expand, it is likely attempts to cost cut and
deliver a less felicitous design (hard to imagine a
worse one as the current) will develop. As for the
design itself, putting a "grab and go" shop balanced
between a celebration for the YWCA and a memorial
for the dead hardly does service to either goal; and it
becomes a crass hodgepodge of intentions, with no
architectural merit. The public is highly engaged and
incensed and while many do not want a building on
the site at all, the real argument is that the current
design makes no real concessions to the
neighborhood or the site on which it wants to stand.
Jul 6 2026
1:18PM
Carol Jackson 1461 Patterson
Ave Charleston
29412
Please do not approve the submissions you will rule
on for any of these 3 scene changing projects--huge
in scope, location and purpose. I know there will be
plenty of commentators who have the expertise and
experience I don't claim. My collective descriptions
for each of these inappropriate projects and sites are
dishonoring, disruptive and deconstructive to the
longstanding architectural values and objectives your
Board is pledged to uphold. Thank you.
Jul 6 2026
3:50PM
Michael Turner 1918 2nd Drive Dear Members of the Board of Architectural Review,
I am submitting this formal public comment
regarding the proposed student residence hall
Jul 6 2026
4:44PM
Board of Architectural Review – Large
106 Coming Street Page 10
project at 106 Coming Street, bounded by Calhoun,
Coming, and Vanderhorst Streets. My perspective is
informed by 23 years of institutional service at the
College of Charleston, including serving as the
Director of Facilities Planning for eight years. While
understanding the institutional need for student
housing, I urge the Board to defer conceptual design
approval until comprehensive, independent
archaeological investigations are finalized, and the
site's complete physical and cultural conditions are
fully understood. The presence of the 1794–1807
Strangers and Negroes Burial Ground is deeply
relevant to this Board’s explicit duty to ensure that
new construction is sympathetic to the historic
features, setting, and sacred context characterizing a
site. Granting early conceptual approval would
severely inhibit the community’s ability to guide the
interpretation and commemoration that must be the
core focus of this property. The following critical
factors require the Board’s immediate scrutiny prior
to rendering any design decisions: 1. Incomplete Site
Diagnostics vs. Spatial Realities Premature Review:
Design concepts cannot be evaluated responsibly
without completed ground-penetrating radar (GPR)
and subsurface archaeological mappings.
Subsurface Preservations: While 19th-century
residential structures facing Coming and Vanderhorst
Streets utilized shallow brick footings or piers
extending only 1 to 3 feet deep (largely to avoid the
peninsula's high water table), these footprints left
the deeper, interior spaces of the block significantly
undisturbed. The former backyard zones—now
capped by surface parking lots—likely contain heavily
intact, layered human remains from the 1794–1807
municipal cemetery. Reviewing structural massing or
foundation footprints prior to mapping these intact
sectors presents an extreme risk of site desecration.
Topographical Disparities: Historical data indicates
that the city's segregated municipal practices
relegated the remains of enslaved and free people of
African descent to the lower, topographically
challenged, and marshy sections near the historic
Coming’s Creek bed, while saving more stable ground
for white "strangers." Designing a building footprint
before mapping these distinct sectors compromises
the context of the site. 2. Discrepancies in
Institutional Planning and Unprecedented Financial
Expenditures Record-Breaking Acquisition Costs for
an "As-Is" Site: The College of Charleston’s as-is
purchase of this approximately 1-acre unimproved
parcel for nearly $28 million represents an
unprecedented per-acre transaction for the City of
Board of Architectural Review – Large
106 Coming Street Page 11
Charleston and the State of South Carolina.
Committing a premium, record-setting sum for raw,
unremediated real estate—without factoring in the
massive development liabilities of an active burial
ground—placed an immediate, structural strain on
the project's financial validity. A Deviation from
State Funding Norms and Taxpayer Subsidy: The
revenue source for this property acquisition came
from the State of South Carolina’s Capital Reserve
Fund. Historically and conventionally, these state-
appropriated funds—which are directly comprised of
state revenues and fundamentally backed by South
Carolina taxpayers—are typically reserved for
Education and General (E&G) purposes, such as
academic buildings, labs, and capital infrastructure
that benefit the entire student body. By South
Carolina statutory design, auxiliary operations
(including housing, dining, athletics, and parking) are
mandated to be self-supporting enterprises funded
by their own generated revenues. While the specific
wording of the budget proviso legally permitted this
particular transaction, using general state capital
funds to purchase a premium site means that South
Carolina taxpayers indirectly footed the bill for a
housing project, bypassing standard fiscal boundaries
and shielding the project from the true financial
scrutiny a self-supporting auxiliary should face. A
Failure of Due Diligence and Negotiation: College
administrators have publicly admitted they were fully
aware that a centuries-old burial ground surrounded
and occupied this site before they finalized the
purchase. This raises a critical question for the public
record: knowing the extreme historical sensitivities,
the massive legal obligations, and the strict
requirement that housing projects eventually sustain
themselves, why did the college fail to leverage this
knowledge during negotiations? No concessions
appear to have been made with the developer to
perform advance subsurface testing, build in deep
cost discounts, or structure site development
safeguards into the contract before committing
millions in atypical state funds. Unaddressed
Operational and Economic Feasibility: Because the
land was bought as an unimproved, "as-is" site at a
premium market rate, the underlying financial model
for the actual housing operation is inherently fragile.
A project of this magnitude requires a multi-year,
highly complex forensic excavation, advanced
bioarchaeological mapping, potential DNA analysis,
and individual reinterments. By failing to structure
these massive, infrastructure-level archaeological
liabilities into the initial purchase model, it remains
Board of Architectural Review – Large
106 Coming Street Page 12
completely unverified how the housing auxiliary can
legally remain self-supporting while still fulfilling its
state-mandated goal of providing affordable student
housing. Abrupt Abandonment of the Vetted Capital
Roadmap: The College of Charleston's 2023 Campus
Framework Plan previously prioritized the
development of three smaller, less historically
complicated student housing locations: the Lightsey
Center Annex, the College Lodge, and the Wentworth
Street parking garage. These projects were actively
on the design boards, with some already undergoing
the formal state approval process. Crucially, the
Lightsey Center Annex and College Lodge dormitory
projects were situated on existing campus property
that was already owned and paid for by the college.
Developing these sites would have yielded a vastly
superior financial outcome for the institution—
delivering a lower per-bed cost overall and
maximizing long-term taxpayer and university value,
even with a smaller total bed count. The sudden,
administrative directive to halt these cost-effective
projects to force all effort and capital into a high-risk,
premium-priced purchase at 106 Coming Street
points to institutional haste rather than sound fiscal
or spatial design. 3. Ethical and Socio-Cultural
Context Adherence to Commissioned Findings: The
College of Charleston’s own commissioned historic
reports note a distinct possibility that this potter's
field contains the remains of captive individuals
brought through Gadsden's Wharf to be sold into
slavery. Moving forward with building footprints
before these ancestral remains are fully accounted
for risks replicating historical patterns of exploiting
marginalized populations for administrative or
institutional convenience. Impact on the Student
Body: Erecting a massive modern facility on an active,
sacred burial ground ignores the social and
psychological impact on the prospective residents,
particularly non-white students who may feel deep
discomfort living atop an inadequately preserved
ancestral site. A Staring Double Standard in
Institutional Precedent: The current rush to clear and
develop the Coming Street cemetery stands in direct,
unbalanced contrast to the philosophy expressed by
the college just two years ago. On October 21, 2024,
during a soil collection ceremony at Rivers Green to
honor three former African American cemeteries,
College of Charleston President Andrew T. Hsu
explicitly stated: "Throughout human history, the soil
near gravesites and in burial grounds holds deep
cultural, spiritual and historical significance... The soil
connects us and, quite literally, provides us all
Board of Architectural Review – Large
106 Coming Street Page 13
common ground." If the administration genuinely
believes that burial soil holds this deep cultural and
spiritual significance, that standard must be applied
equally here. It creates an unacceptable double
standard to perform symbolic ceremonies of
reverence on one part of campus while rushing a
massive concrete foundation over an active,
unmapped burial ground on another. The sanctity of
this burial ground demands that we do not rush the
process. I respectfully ask that the BAR defer review
of this project until the complete scope of the
underground remains is scientifically established,
ensuring that the final design is shaped by historical
reality rather than institutional haste. Respectfully
submitted, Michael J. Turner Former Director of
Facilities Planning, College of Charleston Charleston,
SC
Hallie Seibels 34 Rutledge
Avenue
Do not build a huge dorm on top of a graveyard. I
vote no
Jul 6 2026
6:16PM
Melody Miller 98 Logan St,
Charleston, SC
29401
I urge the BAR not to rush to design approval for this
project. This is an 18th-century burial ground and
should be treated with respect; time should be
allowed for archaeological review.
Jul 6 2026
8:16AM
Larry Musetti 98 Logan St,
Charleston
Please do not approve. CofC is not a good Charleston
citizen. They only have their interests at heart.
Worse, CofC is fuzzing the facts, not totally honest or
trustworthy. Your approval now would make harder
our ability to shape interpretation and
commemoration of this historic burial ground.
Jul 6 2026
8:37AM
Lynn Hanlin 67 Meeting,
Charleston SC
29401
It’s premature to act on this request as the
archaeologists report is not complete. Such report
will aggect the design of new construction .reject the
CofC request at this time
Jul 6 2026
9:55PM
Ellen Waller 1056 Wharf
Indigo Place, Mt.
Pleasant, SC
The CoC does not appear to be a good steward of
Charleston. Ignoring the public burial ground on the
proposed site in addition to apparently ignoring or
disregarding the surrounding neighborhood speaks
volumes. Disappointing.
Jul 6 2026
10:04PM
Jerome Harris 528 Cecilia Cove
Dr, Charleston,
SC 29412
The proposed Coming Street Commons new
construction project is controversial and has stirred
strong emotions in broad segments of the
community. The approach to secure regulatory
approvals for the project without meaningful
engagement of descendants and other impacted
stakeholders is disturbing to me both as a member of
the Protect and Respect the Bodies Coalition and the
Community Engagement Council. The community
engagement efforts undertaken to date have been
more performative than substantive in my opinion.
Much remains to be done by the applicant and the
owner before conceptual approval is granted by BAR
Jul 7 2026
8:38AM
Board of Architectural Review – Large
106 Coming Street Page 14
L on the architectural aesthetic elements of this
project to answer the question how the design
appeals to human senses and how the proposed
elements combine to define the structure's visual
character, cultural meaning and spatial experience
given the history of the site. Prior to granting
conceptual approval BAR L should require the
applicant and owner to: 1) secure from the City of
Charleston approval to remove the site as an
abandoned cemetery as requires by SC Code Section
27-43-40 2) secure approval of a Cemetery and
Commemoration Plan for the Potter's Field/ Second
Official Cemetery reflecting engagement with the
descendant community and consultation with SC
DES<SHPO<the City of Charleston, stakeholders and
other interested parties. I urge BARL to defer this
application
Amanda Metze 321 Sumter St 106 Coming Street is the final resting place for an
estimated 4,600-12,000 immigrants, orphans, and
enslaved people that were forcibly brought into the
City of Charleston through Gadsden’s Wharf. The
purchase of this property and discovery of this burial
ground places immense international responsibility in
the hands of College of Charleston, the City of
Charleston, and the State of South Carolina. I urge
the City of Charleston and College of Charleston to
rigorously study precedents, such as the New York
African Burial Ground, as an appropriate
consideration for this site. As public entities, The City
and College of Charleston are obligated to consider
the magnitude of this project, and to remember the
opportunity that they have to offer dignity and
memorialization to those buried at 106 Coming
Street.
Jul 7 2026
11:37AM
Emilie Crossan Summerville I respectfully urge the BAR to defer and reconsider
the proposed design for 106 Coming Street. The
existing one-story mid-century modern structure on
this site has significant historical value in its own
right, as the location of the first Black YWCA in
Charleston and a crucial gathering place for those
involved in the Civil Rights Movement. The College
should do its due diligence to ensure that all those
buried in the cemetery are properly accounted for —
not only freed and enslaved Black and Indigenous
people, but also the poor, the unknown or
“Strangers,” and the orphans from the orphanage
across the street, on whose site the College has also
built a dorm. The last enslaved Africans to enter the
city through its ports, before the end of the
Transatlantic Slave Trade in 1807, were likely buried
here. Beyond the broader ethical concerns, the
proposed work on the site does not sufficiently
Jul 7 2026
11:42AM
Board of Architectural Review – Large
106 Coming Street Page 15
honor the estimated 4,000 to 12,000 people buried
in the cemetery. If the disturbance of the burial
ground cannot be reversed, I urge the BAR to do
everything in its power to require the College to
develop a design that meaningfully reflects and
honors the historic and sacred nature of this site,
drawing on precedents such as the African Burial
Ground National Monument in New York City.
Brittany Lsvelle Tulla 231 King Street,
Charleston, SC
29401
It is imperative that the BAR defer this request until
we have fully archeologically evaluated this burial
ground. This site is of international importance, and
this project requires utmost professional and civic
due diligence.
Jul 7 2026
11:55AM
CITY OF CHARLESTON
BOARD OF ARCHITECTURAL REVIEW – LARGE
989 Morrison Drive
BAR2026-002706 | TMS #4590101001 | East Central | Council District 4
New Construction | Height District 4-12 | Historic Corridor District
Requesting Conceptual Approval of a new multi-family building.
Owner: Scott Fuller (representative)
Applicant: Brad Brown
CITY OF CHARLESTON
BOARD OF ARCHITECTURAL REVIEW – LARGE
989 Morrison Drive
18 Comments Submitted
3 in Support | 15 in Opposition
First Name Last Name Address Submitted Comment Date/Time
Submitted
3 Comments in Support
Justin Moffitt 29403 This is a well designed building that fits the intent of
its zoning district (Upper Peninsula). The city
specifically selected this area of the peninsula to
have higher density. This fits the area and is
significantly better than what is on the parcel now.
Jul 2 2026
3:30PM
Pat DeMarco 1430 Brian
Road,
Charleston,
SC 29407
Upon review of the overall trade-offs of this project, I
believe it to be a net positive for the city and should
be approved as-is and without delay. - Thanks to
this project's relatively isolated site, the height
shouldn't cause any problems for immediate
neighbors. - This also is not a historic or low-density
area, and there are similar-size projects very close to
the site. - It would be ideal to have ground-level retail
and pedestrian activity. Perhaps this project could
have retail/restaurant amenities available on an
elevated floor via stairs/ramp. But this is less
important than 1) providing urgently-needed rental
housing, and 2) ensuring that the site is flood-
resilient. - Yes, the tidal and environmental concerns
are important. We should ensure this project
provides adequate buffers for wetlands, and that its
landscaping includes native vegetation, pollinator
plants, and wetlands-appropriate grounds that drain
well and can support marsh-dwelling creatures. We
as a city have two paths forward: continue to freeze
the peninsula into a museum for wealthy people and
tourists, or allow it to be a dynamic city that works
for all demographics. It would be great if nothing
had to change, but that isn't possible. This overall is
a worthy project for the city.
Jul 2 2026
12:43PM
Jessica Smith 5106 West
Dolphin St.
North
Charleston,
SC 29405
I'm writing today to voice my support for the
proposed building at 989 Morrison Drive. Unlike the
previous design, this design does not impact
Newmarket Creek. It also satisfies multiple incentives
from the Upper Peninsula District, including:
workforce housing, decreasing stormwater runoff
and impervious surfaces, exceptional bicycle parking
and facilities, and the obtainment of a green building
certification. This building would be a win for the city
of Charleston and I hope you will support it!
Jul 6 2026
10:42AM
Board of Architectural Review – Large
989 Morrison Drive Page 2
15 Comments in Opposition
Stephen Ziff 8 Legare St The proposed height and scale is overwhelming. Jul 2 2026
1:38PM
Constance Baldwin 1 Bishop
Gadsden
Way, Apt.
211;
Charleston,
SC 29412
The proposed building at 12 stories is too tall and
much too large for the site. In addition. the dark
color and strange "screening" which overlays the
windows bears no reference to Charleston
architecture of any period. What is the most puzzling
is that PS3P is a local firm and should have produced
a much smaller, significantly better design for that
location and for our city.
Jul 2 2026
2:34PM
Isabel Warner Wagener
Terrace
Deny request due to continues building of these large
scale projects that end io having multiple structural
issues and mold issues. These issues go unanswered
at other buildings. We don't need more.
Jul 2 2026
2:52PM
Lesa Watts 947 White
Point Court
A 12-story apartment building In a flood zone and
built on a tidal creek- No, please don’t approve this
proposal. The scale and size of this project are so far
off the mark for what Charleston residents want to
see being constructed here. The size of this building
alone is so out of character for our city. Not to
mention the additional cars and traffic potentially
added to an already very high traffic area.
Jul 2 2026
4:54PM
Howard Taylor 979 Lakeview
Dr.
Too large a footprint, too tall, too much. Jul 2 2026
12:40PM
Anna Brigid Creason 10 9th
avenue
Charleston, sc
29403
YIKES, the scale alone of this project overwhelms the
area. Not to mention having to raise the ground floor
due to the tidal creek it would sit on. This will end up
being a pain for residents of the building and the
community. Have we learned nothing from Atlantic
on Romney? The only benefit is to the developers
bank account.
Jul 2 2026
12:48PM
Jennifer B. 55419 The proposed height, scale, and mass overwhelm the
site and its context. 12 stories significantly exceeds
nearby building heights, and the footprint fills the
site with insufficient articulation to reduce perceived
mass. The architectural expression — particularly
window scale and patterning — is unnecessarily
complicated.
Jul 2 2026
12:54PM
MEREDITH HOFFORD 2 LAURENS
ST,
CHARLESTON,
29401
How is it that ANY development was approved for
this site?! much less something of this scale. Please
preserve the Newmarket Creek as much as possible.
The population density of this area of the Peninsula is
TOO MUCH. This building is too large and too high.
Jul 3 2026
1:06PM
Renee Webb 99 King St The proposed building’s height, scale, and overall
mass are out of proportion with the surrounding area
and overwhelm both the site and its context. 2. At 12
stories, the building is substantially taller than
neighboring structures, and its expansive footprint
occupies most of the site with too little architectural
Jul 4 2026
7:30PM
Board of Architectural Review – Large
989 Morrison Drive Page 3
articulation to lessen its visual bulk.
Harlan Greene 32 Chapel
Street,
Charleston,
SC
While the architectural design seems massive for the
site and with flood levels restricting use of the
ground level, this plan, as presented, seems to
negate the spirit of this neighborhood, and seems to
continue the idea of creating towers that disconnect
residents from their neighborhoods, require more
cars, and appeal to non residents ... This then seems
to defy local attempts to curb tourism and to deal
with possible flooding. Destroying on the last tidal
creeks in the area, and piling more people into a
vulnerable spot does not seem to be a wise move for
our city.
Jul 6 2026
1:27PM
Joe McGee 1 Magazine
Street
The proposed height, scale, and mass overwhelm the
site and its context. 12 stories significantly exceeds
nearby building heights, and the footprint fills the
site with insufficient articulation to reduce perceived
mass. The architectural expression is very
unappealing, not sympathetic to nearby properties.
The appropriate denial of ground floor waiver,
complicated by flood zone and FEMA requirements
seem to not favor of this scale of development.
Cannot the future of the neck be more appropriately
designed and human-scale?
Jul 6 2026
5:15PM
Blake Scott 211 Gordon
St.
Dear Board Members, Please protect the historical,
cultural, and environmental heritage of the peninsula
of Charleston and deny this current request at 989
Morrison. The property is historically part of
Newmarket Creek, and is highly flood prone. The
builders should give more space - a wider vegetative
buffer - for what remains of the marsh. They are
trying to maximize profit, via building square footage,
at the expense of the rest of us, downstream. Have
your building, but give some space back to the marsh
and nature. In the long run, it will add value to all of
our properties and the community can still
experience a healthy tidal creek and greenspace
downtown.
Jul 6 2026
6:58PM
Larry Musetti 98 Logan St,
Charleston
FEMA’s requirements will restrict pedestrian activity
at this massive complex. It violates everything I view
as Charleston. The proposed height, scale, and mass
overwhelm the site and its context.
Jul 6 2026
8:50AM
Lynn Hanlin 67 Meeting,
Charleston SC
29401
The scale, mass, height overwhelm the surrounding
buildings. Additionally, the property is located in a
flood zone which should take priority over whatever
is built.
Jul 6 2026
10:05PM
Carol Jackson 1461
Patterson
Ave
Charleston
29412
Please do not approve the submissions you will rule
on for any of these 3 scene changing projects--huge
in scope, location and purpose. I know there will be
plenty of commentators who have the expertise and
experience I don't claim. My collective descriptions
Jul 6 2026
3:50PM
Board of Architectural Review – Large
989 Morrison Drive Page 4
for each of these inappropriate projects and sites are
dishonoring, disruptive and deconstructive to the
longstanding architectural values and objectives your
Board is pledged to uphold. Thank you.
CITY OF CHARLESTON
BOARD OF ARCHITECTURAL REVIEW – LARGE
48 & 52 Line Street
BAR2026-002700 | TMS #4590503136, 4590503139
Cannonborough/Elliottborough | Council District 8 | New Construction
Height District 8 | Old and Historic District
Requesting Revision to Conceptual Approval and Preliminary Approval
of two (2) mixed-use buildings.
Owner: LL East LLC
Applicant: Kevin Smith (Robert A.M. Stern Architects)
CITY OF CHARLESTON
BOARD OF ARCHITECTURAL REVIEW – LARGE
48 & 52 Line Street
7 Comments Submitted
First Name Last Name Address Submitted Comment Date/Time
Submitted
Stephen Ziff 8 Legare St The redesign is cheapened and should be
rejected. Developer just wants to turn a getter
profit at citizens' expense.
Jul 2 2026
1:44PM
Isabel Warner Wagener
Terrace
Deny the request. Put in a park considering the
building just went up at the top of king and line
which is going to create incredible congestion
issues but there have been no road infrastructure
ideas made to make sure the area is moving as
smooth as it should. Keep the historical charm of
Charleston…. Our charm is disappearing.
Jul 2 2026
2:54PM
Jennifer B. 55419 Reduced architectural detailing across both
buildings diminishes overall quality and
compatibility with the surrounding district.
Revised massing is more boxy and less responsive
to its context. These changes represent a step
backward; strong design standards should be
upheld given the project’s impact on the
streetscape and skyline.
Jul 2 2026
12:55PM
MEREDITH HOFFORD 1 LAURENS ST,
CHARLESTON
29401
Please do not approve these proposed changes.
The original design is MUCH better. Stick with it.
Do not reward or encourage this "bait and switch"
tactic.
Jul 3 2026
1:10PM
Larry Musetti 98 Logan St,
Charleston
This project should not allow the delays any
longer. Please do not approve changes now after
so many years of mistakes that diminishes overall
quality of these historic buildings. It’s backward
and will harm this the character of this historic
Charleston neighborhood.
Jul 6 2026
9:02AM
Lynn Hanlin 67 Meeting ,
Charleston SC
29401
Reject this new plan as it significantly departs
from the approved plan from 2018, a plan which
included significant input from steak holders,
preservation groups .
Jul 6 2026
10:18PM
Carol Jackson 1461 Patterson
Ave Charleston
29412
Please do not approve the submissions you will
rule on for any of these 3 scene changing projects-
-huge in scope, location and purpose. I know
there will be plenty of commentators who have
the expertise and experience I don't claim. My
collective descriptions for each of these
inappropriate projects and sites are dishonoring,
disruptive and deconstructive to the longstanding
architectural values and objectives your Board is
pledged to uphold. Thank you.
Jul 6 2026
3:50PM
CITY OF CHARLESTON
BOARD OF ARCHITECTURAL REVIEW – LARGE
251 King Street
BAR2026-002690 | TMS #4570801052 | Downtown | Council District 4
Category 2 | c. 1880’s | Height Districts 3, 6 | Old and Historic District
Requesting Conceptual Approval of exterior alterations and illuminated signage.
Owner: Peter Demetre
Applicant: Bill Marshall
Gt?attv Ervix fie Co.
Classic Clothiers To Gentlemen
June 12, 2026
To: Cityof Charleston BAR
RE: M.P.Demetre Improvements to 251 King St.
To Whom it may concern:
My name is Chip Ervln. I am the business and building owner at 313 King St./Grady Ervin &
Company for over 30 years.
I am writing in support of M.R Demetre Improvements to 251 King St. This is a huge win for
the City of Charleston and the Historic King Street shopping district! This local building
owner is doing great things with the preservation and improvement to this property!
The plans for a Future Rolex High End Boutique built to a very high finish and standard!
Good for all retail on King St. with the fact that the owner is Peter Demetre along with the
Gold standard of Retailer's and world class watch maker.
The repairs to the building interior and facade will be second to none based on the
stewardship of the other Demetre buildings that front King St. this too is very exciting for the
city and the most Historic Street in SC. Not many property owners are willing to make such
a large financial investment to pass on to future generations.
Many thanks in advance for your consideration.
Chip Ervin
313 King Street Charleston, SC 29401 4- Ph: 843-722-1776 4> Fax: 843-722-1708
BEEMOK HOSPITALITY
COLLECTION
200 Meeting Street, Ste 11
Charleston, SO 29401
BHC.COM
30 June 2026
Dear B.A.R. Members,
We are pleased to offer our support for Demetre Jewelers' proposed plans for the 251
King Street Rolex Project. Having reviewed the images of the boutique, we believe the
exterior and interior elements are compatible with the historic district's guidelines and
would be a welcome improvement to the streetscape we share.
As a neighboring business, we welcome this common investment to the city's namesake
street and encourage the Board's favorable consideration.
Sincerely,
Casey Lavin
President
Beemok Hospitality Collection
7/1/26, 4:47 PM Fw: 251 King - Bill Marshall - Outlook
about:blank
Outlook
Fw: 251 King
From Bill Marshall
Date Wed 7/1/2026 4:46 PM
To Bill Marshall
From: Kate Dutilly
Sent: Thursday, June 18, 2026 5:30 PM
To: Bill Marshall
Subject: Re: 251 King
Hi Bill,
April forwarded me the drawings you sent over regarding 251
King. I just took a closer look and as I think we discussed when we
met, we do not have any concerns/questions at the moment. We
look forward to seeing the project move forward!
Thanks,
Kate Dutilly
Preservation Planner
Historic Charleston Foundation
40 East Bay Street, Charleston, SC 29401
1/4
7/1/26, 4:49 PM lnbox - Bill Marshall - Outlook
Outlook
Re: Rolex BAR_S set
From Flannery Antinoro
Date Wed 6/17/2026 4:54 PM
To Bill Marshall; Laurel Fay
Hi Bill,
We took another look at the plans and have no questions or
concerns about the project.
Thank you again for taking the time to meet with us. Please let me
know if you have any questions.
Best,
Flannery Antinoro
Preservation Specialist
PRESERVATION SOCIETY OF CHARLESTON
14 7 King Street
Charleston, South Carolina 29401
0: 843. 722.4630 ext. 125
12reservationsocie(Y..org
From: Flannery Antinoro
Date: Wednesday, June 10, 2026 at 5:00 PM
https://outlook.cloud .microsoft/mail/id/AAQkADU0Yzl2ZDU0L TkzZWMtNDIIMS04MmJmL Tk5YjU 1 ZmQ 1 ODExYQAQAJcsWpLGqBplleaEYIQVikw%3D 1 /3
CITY OF CHARLESTON
BOARD OF ARCHITECTURAL REVIEW – LARGE
134 Saint Philip Street
BAR2026-002672 | TMS #4601202038 | Radcliffeborough | Council District 4
Category 3 | c. 1887 | Height Districts 2.5-3, 4 | Old City District
Requesting Final Approval of an exterior lighting package.
Owner: Father Johnbosco Ikemeh (St. Patrick Catholic Church)
Applicant: David Hill (Innova Architecture)
Position Statement Board of Architectural Review - Large July 8, 2026 134 St. Philip Street Dear Board Members: The Preservation Society of Charleston commends the St. Patrick's congregation for its dedicated stewardship of this important historic church. We were honored to highlight their preservation efforts during Preservation Month and look forward to seeing the broader restoration project come to fruition. While we are not opposed to uplighting this building, we encourage the applicant to minimize the proposal’s visual and physical impact on the historic exterior to the greatest extent possible. Specifically, we recommend reducing the amount of visible conduit as well as the scale and prominence of the proposed light fixtures. We encourage the applicant to work with staff to pursue a simpler, more discreet lighting design that achieves the project goals while remaining sensitive to the character of the historic building. Sincerely, Anna-Catherine Alexander Director of Advocacy Initiatives
Source: City of Charleston website. First collected Oct 31, 2026.