CITY OF CHARLESTON
DESIGN REVIEW BOARD
PUBLIC COMMENT
JULY 6, 2026
A meeting of the Design Review Board (DRB) will be held on Monday, July 6, 2026 at 4:30 p.m.
in the Public Meeting Room, First Floor, 2 George Street.
The following written comments will be provided to the board members on the deadline date and
also be acknowledged into the record and summarized. The public is encouraged to attend the
meeting in person to speak in order for comments to be fully heard.
Application information is available at www.charleston-sc.gov/drb. Please check the website on the
meeting date to view any withdrawn or deferred agenda items.
For additional information, please contact:
Department of Planning & Preservation | 843-724-3781
A. APPLICATIONS
1. 1798 Ashley River Rd.
West Ashley | Council District 9 | TMS# 351-07-00-002 | DRB2026-000355
Requesting approval of staff denial of a sign package that uses gradient colors for their
signage.
Owner: Jupiter Holdings
Applicant: Kimberly Hunt/Supreme Sign Services.
No Comments Submitted
2. 3041, 3025, 3015 Reva Ridge Dr.
Johns Island | Council District 3 | TMS# 313-00-00-584, 585 | DRB2026-000357
Requesting conceptual approval for three new 3-story multi-family buildings.
Owner: Crowne at Live Oak Sq. Phase 2
Applicant: Spencer Plowden
1 Comment Submitted:
• Michelle Robbins, 1508 Roustabout Way, Charleston, SC 29414
Submitted to Innovate Site on July 5, 2026 11:24 AM
We strongly oppose further approvals for multifamily apartments, housing
developments, drive-through fast food, storage units, car washes, gas stations, and
similar high-impact projects in West Ashley. Our roads are already overwhelmed,
and thousands of apartments and homes have recently been built, approved, or are
planned near Bees Ferry and Glenn McConnell. Residents have repeatedly voiced
concerns, yet development continues to move forward despite clear community
opposition. West Ashley needs a moratorium on additional multifamily housing until
traffic infrastructure, drainage, public safety, and quality-of-life impacts are properly
addressed. Continued overdevelopment is destroying the wooded landscape,
displacing wildlife, and pushing animals into neighborhoods where they increasingly
pose risks to pets and residents. Instead of more apartments and low-value
commercial development, the community needs thoughtful restaurants, local retail,
Design Review Board
Public Comment | July 6, 2026 Page 2
outdoor gathering spaces, and entertainment that enhance West Ashley without
erasing the natural character that makes it special. Protect what remains before it is
gone.
3. 3930 West Ashley Circle
West Ashley | Council District 5 | TMS# 301-00-00-819, 469 | DRB2026-000356
Requesting preliminary approval for a single-story shell retail building.
Owner: Bees Wedge, LLC
Applicant: LFK Architects, LLC
1 Comment Submitted:
• Michelle Robbins, 1508 Roustabout Way, Charleston, SC 29414
Submitted to Innovate Site on July 5, 2026 11:27 AM
We strongly oppose further approvals for storage units, car washes, gas stations, and
similar high-impact projects in West Ashley. Residents have repeatedly voiced
concerns, yet development continues to move forward despite clear community
opposition. West Ashley needs a moratorium on additional multifamily housing until
traffic infrastructure, drainage, public safety, and quality-of-life impacts are properly
addressed. Continued overdevelopment is destroying the wooded landscape,
displacing wildlife, and pushing animals into neighborhoods where they increasingly
pose risks to pets and residents. Instead of more apartments and low-value
commercial development, the community needs thoughtful restaurants, local retail,
outdoor gathering spaces, and entertainment that enhance West Ashley without
erasing the natural character that makes it special. Protect what remains before it is
gone.
4. 2110 Ashepoo Ln.
UP | Council District 4 | TMS# 464-06-00-011 | DRB2026-000362
Requesting Preliminary approval for a new 4-story storage building.
Owner: JEAL-K Associates LLC
Applicant: SeamonWhiteside and Assoc
1 Comment Submitted:
• Michelle Robbins, 1508 Roustabout Way, Charleston, SC 29414
Submitted to Innovate Site on July 5, 2026 11:29 AM
We strongly oppose further approvals for multifamily apartments, housing
developments, drive-through fast food, storage units, car washes, gas stations, and
similar high-impact projects in West Ashley. Instead of low-value commercial
development, the community needs thoughtful restaurants, local retail, outdoor
gathering spaces, and entertainment that enhance West Ashley without erasing the
natural character that makes it special. Protect what remains before it is gone.
Design Review Board
Public Comment | July 6, 2026 Page 3
5. 3943 West Ashley Circle
West Ashley | Council District 5 | TMS# 301-00-00-469 | DRB2026-000360
Requesting preliminary approval for a new 1-story McDonalds.
Owner: Whitefield Construction Co
Applicant: McDonalds USA LLC
2 Comments Submitted:
• Michelle Robbins, 1508 Roustabout Way, Charleston, SC 29414
Submitted to Innovate Site on July 5, 2026 11:33 AM
We strongly oppose further approvals for drive-through fast food, storage units, car
washes, gas stations, and similar high-impact projects in West Ashley. Instead of low-
value commercial development, the community needs thoughtful restaurants, local
retail, outdoor gathering spaces, and entertainment that enhance West Ashley without
erasing the natural character that makes it special. Protect what remains before it is
gone.
• Loretta Silecchia, 402 Blue Jasmine Ln, Charleston 29414
Submitted to Innovate Site on July 5, 2026 3:50 PM
our neighborhood does not need another McDonalds restaurant.There is a McDonalds
across the street in Walmart.There is too much traffic in the area because of all the
apartments that were built nearby. Fast food such as McDonalds will lower our quality
of life.We need small franchise or mom and pop restaurants
6. Grand Oaks, just NW of W. Ashley Circle
West Ashley | Council District 10 | TMS# 301-00-00-052 | DRB2026-000361
Requesting conceptual approval for a new multi-family community with seven 4-story
buildings containing 348 units, 33 townhomes, 6 detached garages and a clubhouse.
Owner: Middleburg Communities
Applicant: Mark Ward
First
Name
Last
Name
Address Submitted Comment Date/Time
Submitted
Pamela Wike 793 Bent
Hickory Road
I am opposed to the site design and architecture of the
buildings. The site design has "future city roadway" and
"future Long Savannah Pkwy", when are these roadways
being constructed? I'm assuming after the construction is
done and the contractor is long gone. So, then residents
will pressure the Mayor and City Council to do something
in reverse, just doesn't make sense. Infrastructure first then
development. The design also has two ponds to send all
the flooding/stormwater too. Why can't nature based
solutions be used by the engineering firm to save more
trees in/around the pond and beyond? Take a look at the
pond right down the street that has a couple trees that
have thrived for years growing in the ponds. The 25'
landscape buffer along Grand Oaks Boulevard doesn't
make sense. Why not put the Long Savannah Road 50'
landscape buffer on the Grand Oaks Boulevard side? Push
the whole plan slightly and the residents get 25 more feet
of wooded scenery. The Long Savannah Road stretch has
Jul 1
2026
3:23PM
Design Review Board
Public Comment | July 6, 2026 Page 4
no people living there, the buffers just don't make sense.
The 15' landscape buffer for the "future city road" will not
provide adequate shade for Building #4 when the sun is
setting. Finally, on the plan there's the tree preserve areas,
I think the engineering firm could design this better to save
more "already there" trees.
Kathryn Wilson 225
Brambling
Lane,
Charleston,
SC 29414
Dear DR Board: I’d like to express my strong disapproval
of the proposed height for the apartments of the planned
development at Grand Oaks. The current design calls for
seven (!), four- story apartment buildings. This new
development sits at the entrance to Grand Oaks setting
the first impression of our neighborhood! All of the existing
apartment buildings in Grand Oaks – Proximity, The
Atlantic, The Enclave and Bees Ferry – have no more than
three stories. Please – as you do for the downtown
peninsula - have some respect for the existing
neighborhood of Grand Oaks and keep with what is
already here. Go view the other apartments here to see
how they blend with the single family home sub-divisions.
To approve the developers’ current design would show
that the DRB has complete disregard for the character and
beauty of ALL our neighborhoods. Do not allow the new
apartments to be more than three stories tall! I hope the
Board will agree and deny approval of the current design.
Thank you.
Jul 4
2026
5:21PM
Loretta Silecchia 402 Blue
Jasmine
Ln,Charleston
29414
There are too many apartments and townhomes already in
my neighborhood. Our quality of life has already been
affected by all the extra population and traffic. my
neighborhood is already being impacted by all the fumes
from the traffic. it takes several lights to get out of grand
oaks blvd during non rush hours. we time our trips in the
community to try to avoid traffic but there is always traffic.
I moved down here to escape traffic and the concrete
jungle. Apartments eventually will destabilize our
neighborhood. Build homes that young people can afford
not apartments, we have more than enough here.
Jul 5
2026
4:06PM
Erin Lawhorn 1500
parklawn
drive
Dear Members of the Design Review Board,As a
concerned cofounder of the Charleston County Tree
Preservation Alliance regarding the upcoming multi-family
and townhome development at Grand Oaks Boulevard, I
request that the Board mandate stringent architectural, site
layout, and landscaping conditions to protect our historic
canopy and combat localized flooding.I respectfully ask
the DRB to incorporate the following requirements into any
conceptual or preliminary approvals:1. Resilient & Native
Canopy Planting SpecificationsNative Live Oaks (Quercus
virginiana): Request that all mitigation canopy trees along
the streetscape and key buffers prioritize native Live Oaks
to maintain the historic character of the West Ashley
canopy.Flood-Tolerant Species: Given the region's intense
stormwater challenges, require the integration of highly
flood-tolerant native and adapted species, specifically
Jul 5
2026
10:59PM
Design Review Board
Public Comment | July 6, 2026 Page 5
requesting the inclusion of Dawn Redwood (Metasequoia
glyptostroboides) in low-lying bio-retention cells and
drainage buffers.2. Best Industry Standard Specs for
Grand Tree ProtectionTo ensure that retained grand trees
survive construction stressors, the developer must adhere to
strict, enforceable tree protection standards before,
during, and after construction:Critical Root Zone (CRZ) /
Drip Line Protection: Erect rigid, chain-link tree protection
barricades at the full radius of the tree’s drip line (or 1
foot of radius per 1 inch of tree diameter, whichever is
greater) before any equipment arrives on site. Barricades
must remain completely undisturbed through final
inspection.Mandatory Hand Digging: Prohibit heavy
machinery within the drip line or CRZ. Any mandatory
utility trenching or grading within these zones must be
executed exclusively via hand-digging or pneumatic air-
spading to prevent root shearing.Color-Sensitive Plan
Zones: Require all civil, architectural, and grading plans to
utilize specialized, highly visible color-coded "Tree
Protection Zones" (TPZs) so contractors can easily identify
zero-tolerance boundaries.3. Tree-Forward Site Layout
and Architectural DesignClustered & Grouped Parking:
Reject standard, monolithic grid parking layouts that force
the clear-cutting of grand trees. Require clustered or
grouped parking configurations that pocket vehicles
around existing root systems.Curved Infrastructure:
Mandate the use of curved parking lot drives, meandering
sidewalks, and curved building footprints. Aligning the
architecture to bend naturally around grand trees
dynamically minimizes root impacts and enhances the
aesthetic value of the development.Thank you for your
rigorous review and continued dedication to protecting
West Ashley's environmental assets.
Michelle Robbins 1508
Roustabout
Way,
Charleston,
SC 29414
We strongly oppose further approvals for multifamily
apartments, housing developments, drive-through fast
food, storage units, car washes, gas stations, and similar
high-impact projects in West Ashley. Our roads are
already overwhelmed, and thousands of apartments and
homes have recently been built, approved, or are planned
near Bees Ferry and Glenn McConnell. Residents have
repeatedly voiced concerns, yet development continues to
move forward despite clear community opposition. West
Ashley needs a moratorium on additional multifamily
housing until traffic infrastructure, drainage, public safety,
and quality-of-life impacts are properly addressed.
Continued overdevelopment is destroying the wooded
landscape, displacing wildlife, and pushing animals into
neighborhoods where they increasingly pose risks to pets
and residents. Instead of more apartments and low-value
commercial development, the community needs thoughtful
restaurants, local retail, outdoor gathering spaces, and
entertainment that enhance West Ashley without erasing
Jul 5
2026
11:34AM
Design Review Board
Public Comment | July 6, 2026 Page 6
the natural character that makes it special. Protect what
remains before it is gone.
Nancy Huber 337
Weeping
Willow Way
How in the world can you all approve this design? Our
beautiful entrance will be taken away. All the wild life
will be removed of tgeir habitat. No way do we need 7 -
4 story apartments much less any apartments. The traffic
now is ridiculous much less adding 1000s of more cars. I
beg you to vote no on this construction.
Jul 5
2026
11:39AM
Pamela Ingram 1036 Tyron
Circle,
Charleston,
SC 29414
The scale is still too large. Not only do we not have any 4-
story buildings in the neighborhood, this is at the front of
the neighborhood, where we have just 1 and 2-story single
family residences. The building height should be no more
than 2-stories. Trees-any removed trees should be
replaced with trees that have more storm resistance and
flood control features (grand oaks, bald cypress, weeping
willow, etc NOT crepe myrtles, etc). Also, they need to
provide more understory vegetation. Close the
entrance/exit onto Grand Oaks Blvd. They claim this is
needed as an emergency exit and that they do not know
for certain that Long Savanna Pkwy will be built so they
can’t count that as an exit. Long Savanna Pkwy is a
definite. They have already clear cut behind Grand Oaks
and neighborhood roads for Long Savanna. I have seen
crews out at the site of the future parkway many times.
Certainly this can be confirmed for them. Make sure the
views of backs of buildings/utilities/garages that back up
to Grand Oaks Blvd. are masked as much as possible with
vegetation
Jul 5
2026
12:19PM
David Quick 1502 Village
Square
Dear Members of the Design Review Board, As a
concerned member of the Charleston County Tree
Preservation Alliance regarding the upcoming multi-family
and townhome development at Grand Oaks Boulevard, I
request that the Board mandate stringent architectural, site
layout, and landscaping conditions to protect our historic
canopy and combat localized flooding. I respectfully ask
the DRB to incorporate the following requirements into any
conceptual or preliminary approvals: 1. Resilient & Native
Canopy Planting Specifications •Native Live Oaks
(Quercus virginiana): Request that all mitigation canopy
trees along the streetscape and key buffers prioritize
native Live Oaks to maintain the historic character of the
West Ashley canopy. •Flood-Tolerant Species: Given the
region's intense stormwater challenges, require the
integration of highly flood-tolerant native and adapted
species, specifically requesting the inclusion of Dawn
Redwood (Metasequoia glyptostroboides) in low-lying bio-
retention cells and drainage buffers. 2. Best Industry
Standard Specs for Grand Tree Protection To ensure that
retained grand trees survive construction stressors, the
developer must adhere to strict, enforceable tree
protection standards before, during, and after construction:
[1] •Critical Root Zone (CRZ) / Drip Line Protection: Erect
Jul 6
2026
8:15AM
Design Review Board
Public Comment | July 6, 2026 Page 7
rigid, chain-link tree protection barricades at the full
radius of the tree’s drip line (or 1 foot of radius per 1 inch
of tree diameter, whichever is greater) before any
equipment arrives on site. Barricades must remain
completely undisturbed through final inspection. [1, 2, 3, 4]
•Mandatory Hand Digging: Prohibit heavy machinery
within the drip line or CRZ. Any mandatory utility trenching
or grading within these zones must be executed exclusively
via hand-digging or pneumatic air-spading to prevent root
shearing. [1] •Color-Sensitive Plan Zones: Require all civil,
architectural, and grading plans to utilize specialized,
highly visible color-coded "Tree Protection Zones" (TPZs) so
contractors can easily identify zero-tolerance boundaries.
3. Tree-Forward Site Layout and Architectural Design
•Clustered & Grouped Parking: Reject standard, monolithic
grid parking layouts that force the clear-cutting of grand
trees. Require clustered or grouped parking configurations
that pocket vehicles around existing root systems. [1]
•Curved Infrastructure: Mandate the use of curved parking
lot drives, meandering sidewalks, and curved building
footprints. Aligning the architecture to bend naturally
around grand trees dynamically minimizes root impacts
and enhances the aesthetic value of the development.
Thank you for your rigorous review and continued
dedication to protecting West Ashley's environmental
assets. Sincerely, David Quick
Leah Low 2753 garden
creek rd chas
sc 29414
Why are we approving more apartments and more of our
grand live oaks to be cut down We have enough
apartments currently being built and that we’re just built on
beesferry. With long savanna coming yall are going to
make this side of west Ashley an absolute nightmare. 1 live
oak holds up to 100,000 gallons of water 1 acre of wet
lands hold up to 1 million gallons of water, so respectfully
why do yall keep prioritizing new comers and developers
over what makes Charleston beautiful and the locals who
have been here our entire lives? Most decisions yall make
are in areas where NONE OF YOU even travel through.
Quit failing true Charlestonians & quit over developing our
home. Do yall sit in this traffic?? It’s absolutely miserable
every damn day!! Yall need to start thinking about people
who have been here for generations being taxed out and
pushed out!! Please STOP CUTTING DOWN OUR LIVE
OAKS!! It tooks hundreds of years for them to get the size
they are, your saplings u have developers plant will never
EVER amount to the live oaks we have today and it won’t
ever come back not in our lifetime Quit destroying
Charleston Blood is on yalls hands.
Jul 6
2026
8:50AM
Anna Skerkavich 220 WATER
LOTUS DR
CHARLESTON
SC 29414
Dear Members of the Design Review Board, As a
concerned member of the Charleston County Tree
Preservation Alliance regarding the upcoming multi-family
and townhome development at Grand Oaks Boulevard, I
request that the Board mandate stringent architectural, site
Jul 6
2026
9:56AM
Design Review Board
Public Comment | July 6, 2026 Page 8
layout, and landscaping conditions to protect our historic
canopy and combat localized flooding. I respectfully ask
the DRB to incorporate the following requirements into any
conceptual or preliminary approvals: Specifications
•Native Live Oaks (Quercus virginiana): Request that all
mitigation canopy trees along the streetscape and key
buffers prioritize native Live Oaks to maintain the historic
character of the West Ashley canopy. •Flood-Tolerant
Species: Given the region's intense stormwater challenges,
require the integration of highly flood-tolerant native and
adapted species, specifically requesting the inclusion of
Dawn Redwood (Metasequoia glyptostroboides) in low-
lying bio-retention cells and drainage buffers. 2. Best
Industry Standard Specs for Grand Tree Protection To
ensure that retained grand trees survive construction
stressors, the developer must adhere to strict, enforceable
tree protection standards before, during, and after
construction: [1] •Critical Root Zone (CRZ) / Drip Line
Protection: Erect rigid, chain-link tree protection barricades
at the full radius of the tree’s drip line (or 1 foot of radius
per 1 inch of tree diameter, whichever is greater) before
any equipment arrives on site. Barricades must remain
completely undisturbed through final inspection. [1, 2, 3, 4]
•Mandatory Hand Digging: Prohibit heavy machinery
within the drip line or CRZ. Any mandatory utility trenching
or grading within these zones must be executed exclusively
via hand-digging or pneumatic air-spading to prevent root
shearing. [1] •Color-Sensitive Plan Zones: Require all civil,
architectural, and grading plans to utilize specialized,
highly visible color-coded "Tree Protection Zones" (TPZs) so
contractors can easily identify zero-tolerance boundaries.
3. Tree-Forward Site Layout and Architectural Design
•Clustered & Grouped Parking: Reject standard, monolithic
grid parking layouts that force the clear-cutting of grand
trees. Require clustered or grouped parking configurations
that pocket vehicles around existing root systems. [1]
•Curved Infrastructure: Mandate the use of curved parking
lot drives, meandering sidewalks, and curved building
footprints. Aligning the architecture to bend naturally
around grand trees dynamically minimizes root impacts
and enhances the aesthetic value of the development.
Thank you for your rigorous review and continued
dedication to protecting West Ashley's environmental
assets. Sincerely, Anna M Skerkavich
David Skerkavich 220 WATER
LOTUS DR
CHARLESTON
SC 29414
Dear Members of the Design Review Board, As a
concerned member of the Charleston County Tree
Preservation Alliance regarding the upcoming multi-family
and townhome development at Grand Oaks Boulevard, I
request that the Board mandate stringent architectural, site
layout, and landscaping conditions to protect our historic
canopy and combat localized flooding. I respectfully ask
the DRB to incorporate the following requirements into any
Jul 6
2026
10:00AM
Design Review Board
Public Comment | July 6, 2026 Page 9
conceptual or preliminary approvals: Specifications
•Native Live Oaks (Quercus virginiana): Request that all
mitigation canopy trees along the streetscape and key
buffers prioritize native Live Oaks to maintain the historic
character of the West Ashley canopy. •Flood-Tolerant
Species: Given the region's intense stormwater challenges,
require the integration of highly flood-tolerant native and
adapted species, specifically requesting the inclusion of
Dawn Redwood (Metasequoia glyptostroboides) in low-
lying bio-retention cells and drainage buffers. 2. Best
Industry Standard Specs for Grand Tree Protection To
ensure that retained grand trees survive construction
stressors, the developer must adhere to strict, enforceable
tree protection standards before, during, and after
construction: [1] •Critical Root Zone (CRZ) / Drip Line
Protection: Erect rigid, chain-link tree protection barricades
at the full radius of the tree’s drip line (or 1 foot of radius
per 1 inch of tree diameter, whichever is greater) before
any equipment arrives on site. Barricades must remain
completely undisturbed through final inspection. [1, 2, 3, 4]
•Mandatory Hand Digging: Prohibit heavy machinery
within the drip line or CRZ. Any mandatory utility trenching
or grading within these zones must be executed exclusively
via hand-digging or pneumatic air-spading to prevent root
shearing. [1] •Color-Sensitive Plan Zones: Require all civil,
architectural, and grading plans to utilize specialized,
highly visible color-coded "Tree Protection Zones" (TPZs) so
contractors can easily identify zero-tolerance boundaries.
3. Tree-Forward Site Layout and Architectural Design
•Clustered & Grouped Parking: Reject standard, monolithic
grid parking layouts that force the clear-cutting of grand
trees. Require clustered or grouped parking configurations
that pocket vehicles around existing root systems. [1]
•Curved Infrastructure: Mandate the use of curved parking
lot drives, meandering sidewalks, and curved building
footprints. Aligning the architecture to bend naturally
around grand trees dynamically minimizes root impacts
and enhances the aesthetic value of the development.
Thank you for your rigorous review and continued
dedication to protecting West Ashley's environmental
assets. Sincerely, DAVID P SKERKAVICH
Tyler Skerkavich 180
RESIDENCES
LANE; unit
301,
CHARLESTON
SC 29414
Dear Members of the Design Review Board, As a
concerned member of the Charleston County Tree
Preservation Alliance regarding the upcoming multi-family
and townhome development at Grand Oaks Boulevard, I
request that the Board mandate stringent architectural, site
layout, and landscaping conditions to protect our historic
canopy and combat localized flooding. I respectfully ask
the DRB to incorporate the following requirements into any
conceptual or preliminary approvals: Specifications
•Native Live Oaks (Quercus virginiana): Request that all
mitigation canopy trees along the streetscape and key
Jul 6
2026
10:02AM
Design Review Board
Public Comment | July 6, 2026 Page 10
buffers prioritize native Live Oaks to maintain the historic
character of the West Ashley canopy. •Flood-Tolerant
Species: Given the region's intense stormwater challenges,
require the integration of highly flood-tolerant native and
adapted species, specifically requesting the inclusion of
Dawn Redwood (Metasequoia glyptostroboides) in low-
lying bio-retention cells and drainage buffers. 2. Best
Industry Standard Specs for Grand Tree Protection To
ensure that retained grand trees survive construction
stressors, the developer must adhere to strict, enforceable
tree protection standards before, during, and after
construction: [1] •Critical Root Zone (CRZ) / Drip Line
Protection: Erect rigid, chain-link tree protection barricades
at the full radius of the tree’s drip line (or 1 foot of radius
per 1 inch of tree diameter, whichever is greater) before
any equipment arrives on site. Barricades must remain
completely undisturbed through final inspection. [1, 2, 3, 4]
•Mandatory Hand Digging: Prohibit heavy machinery
within the drip line or CRZ. Any mandatory utility trenching
or grading within these zones must be executed exclusively
via hand-digging or pneumatic air-spading to prevent root
shearing. [1] •Color-Sensitive Plan Zones: Require all civil,
architectural, and grading plans to utilize specialized,
highly visible color-coded "Tree Protection Zones" (TPZs) so
contractors can easily identify zero-tolerance boundaries.
3. Tree-Forward Site Layout and Architectural Design
•Clustered & Grouped Parking: Reject standard, monolithic
grid parking layouts that force the clear-cutting of grand
trees. Require clustered or grouped parking configurations
that pocket vehicles around existing root systems. [1]
•Curved Infrastructure: Mandate the use of curved parking
lot drives, meandering sidewalks, and curved building
footprints. Aligning the architecture to bend naturally
around grand trees dynamically minimizes root impacts
and enhances the aesthetic value of the development.
Thank you for your rigorous review and continued
dedication to protecting West Ashley's environmental
assets. Sincerely, TYLER D SKERKAVICH
Robert Frederick 110 Sugar
Magnolia
Way
Four stories for apartment buildings in this neighborhood is
unacceptable. The apartments in the back of the
neighborhood top out at three and so should these to keep
with the aesthetic of the overall neighborhood plan.
Jun 26
2026
7:12PM
Eric Wilhelm 1706 N Elgin
Ct
This is another project that is not needed in this area, and
will only lead to more problems for current residents.
Infrastructure continues to be years behind developments in
the area. Bees Ferry, 17 and many other areas are
oversaturated with new or proposed developments. In an
already flood-prone area, removing more
forestry/wetlands vital to countering flooding. Church
Creek's historic flood 10 years ago proved
overdeveloping the Shadowmoss area was foolish. A large
area there has since been reverted to address flooding.
Jun 27
2026
1:20PM
Design Review Board
Public Comment | July 6, 2026 Page 11
Why are developers being given an opportunity to repeat
the same mistakes?
Christine Horne 249 Larissa
Dr,
Charleston,
SC 29414
To the Design Review Board, I respectfully urge the Board
to deny or postpone approval of the proposed Grand
Oaks development. The West Ashley area has
experienced significant growth over the past several
years, and the pace of development has exceeded the
capacity of the surrounding infrastructure. Adding another
large residential development will only worsen existing
problems that residents deal with every day. First, the
road network in this area is already overwhelmed. Traffic
congestion on West Ashley Circle and the surrounding
roads continues to increase, particularly during peak
commuting hours. Residents experience long delays,
difficulty entering and exiting neighborhoods, and
increased safety concerns. The existing transportation
infrastructure simply cannot support hundreds of additional
residential units without substantial roadway improvements.
Second, this project will further reduce wildlife habitat. The
undeveloped land in this area provides an important
refuge for native wildlife, and continued development
fragments these habitats, displaces animals, and
permanently alters the natural character of West Ashley.
Finally, I am deeply concerned about flooding. The
proposed development is located in an area that already
experiences drainage challenges during heavy rainfall.
Replacing natural land with buildings, roads, and other
impervious surfaces will increase stormwater runoff and
has the potential to worsen flooding for surrounding
neighborhoods. Before any approval is considered, there
should be clear evidence that the project will not
negatively impact existing residents or downstream
properties. Growth should be balanced with responsible
planning. Until transportation improvements, environmental
impacts, and flooding concerns are adequately addressed,
approving another high-density development is not in the
best interest of the community. Thank you for your
consideration. Respectfully, Christine Horne
Jun 27
2026
4:21PM
Melissa Muse 637
Halstead St,
Charleston
29414
We cannot support more residents Jun 27
2026
9:17PM
Careen Jensen 904
Lansfaire Dr.,
Charleston,
SC 29414
The design of this project is not within scale of the existing
neighborhood. The proposed buildings are 4 story high.
Within the Grand Oaks neighborhood, we have two and
three story buildings along with single family homes. As I
drive by all the new construction of apartments in the Bees
Ferry/Glen McConnell area, the 4 story apartments are on
the highway and next to retail. The proposed
development does not fit within this neighborhood. Please
consider moving this development to another area or
significantly reduce the size and scale of this housing. As
Jun 27
2026
12:19PM
Design Review Board
Public Comment | July 6, 2026 Page 12
proposed, it will bring much more traffic and we already
have backups getting out of Grand Oaks Blvd and onto
Bees Ferry. Please hear the voice of the people who live in
the neighborhood. There have been many residents who
have commented on this development who don't think we
are being heard.
Malorie Igo 439 minim
street
It’s clear the developer does not care about keeping the
beauty of grand oaks. We shouldn’t look at the landscape
and see a 4story building. We shouldn’t look see grand
oaks, which you are chopping down just as much as you
please. Building heights should be limited to as tall as the
houses 2 stories. We moved to this part of west Ashley for
more nature not buildings and you are destroying that.
Jun 28
2026
3:13PM
Daniel Gracie 260 Gazania
Way,
Charleston,
SC 29414
Dan Gracie 260 Gazania Way Charleston, SC 29424
July 6, 2026 City of Charleston Design Review Board 2
George Street, First Floor Meeting Room Charleston, SC
29403 RE: Opposition to Conceptual Approval—Design
Character and Aesthetic Compatibility 350 Grand
Oaks Boulevard Development MS# 301-00-00-052 |
DRB2026-000361 Dear Design Review Board Members,
I submit this letter in opposition to conceptual approval of
the proposed development at 350 Grand Oaks
Boulevard. The project fails to meet the Design Review
Board's core mandate: "to establish a review process that
will protect and improve the visual and aesthetic character
and economic value" of development within Charleston.
The project's scale, massing, architectural treatment, and
extensive forest clearing are fundamentally incompatible
with Grand Oaks' established aesthetic character.
Approval would diminish both the visual character and
economic value of the neighborhood for existing residents.
I. Grand Oaks' Established Aesthetic Character Grand
Oaks is defined by a distinctive, cohesive visual character
that residents chose deliberately. The neighborhood
consists primarily of one- and two-story homes arranged
along winding roads with preserved wetlands, ponds, and
mature forest canopy. This character is not accidental—it
reflects the original site planning and has endured for
decades as the neighborhood's defining aesthetic. Dr.
Frank Ricker, a longtime Grand Oaks resident, testified to
this before the board in January: "What concerns me is
what happens to Charleston. Developers come in and they
just dump these big buildings on us." His statement captures
what residents understand about their neighborhood's
visual identity: it is modest in scale, residential in character,
and dependent on preserved natural elements. Charlie
Strickland, another resident of 20 years, made this point
directly to the board: the design "does not match the rest
of the community" and asked the board to "consider the
residents who have to view the project daily, not the
developers." This is precisely the DRB's mandate—to
protect the visual character that residents and neighbors
Jun 28
2026
9:38PM
Design Review Board
Public Comment | July 6, 2026 Page 13
experience. II. Scale and Massing: Incompatible with
Neighborhood Character The proposed development
includes four- to six-story apartment buildings. These
heights are fundamentally out of proportion to Grand
Oaks' existing architecture. In January, board member
David Meeks articulated this concern directly: "I think even
at a height scale and massing, I struggle to support it." The
board's own initial response flagged that the scale does
not fit the neighborhood. A four- to six-story apartment
building next to one- and two-story homes creates visual
jarring. The scale relationship is not gradual or
transitional—it is abrupt. Residents living on adjacent
streets will look out their windows at structures 2–3 times
the height of their own homes. This is not a matter of
accepting development. It is a matter of ensuring that
development respects the scale context of its surroundings.
The neighborhood is not asking for no change. It is asking
for change that fits. III. Architectural Incompatibility and
Design Quality The architect described the project as
"meant to feel as residential as possible" and said it would
"echo some kind of Lowcountry vernacular." This framing
reveals a design problem: the project needs to claim to be
residential and Lowcountry because it actually is not either.
A genuine Lowcountry vernacular—which characterizes
existing Grand Oaks homes—features modest pitched
roofs, deep porches, natural materials, and integration
with landscape. A four- to six-story apartment complex
cannot honestly claim that vernacular regardless of surface
details. Applying Lowcountry color palettes to a building
of fundamentally incompatible scale does not create
compatibility. It creates a costume. The board should not
accept design strategies that attempt to mask
incompatibility. The project's design should demonstrate
genuine fit with the neighborhood, not simulate it. IV.
Forest Clearing and Loss of Visual Amenity In June 2026,
the Board of Zoning Appeals approved removal of 22
historic oak trees from this site. Originally the developer
requested removal of 50 trees. The fact that the developer
had to request removal of 50 trees and negotiate down to
22 signals the extent and significance of the existing
forest. This forest is not incidental to the neighborhood's
visual character—it defines it. Grand Oaks residents chose
to live among preserved trees and natural vegetation. The
forest provides visual screening, seasonal interest, and the
sense of being in a landscape rather than an urban
development. Removing 22 historic oaks and clearing
significant forest canopy to accommodate apartment
construction diminishes the neighborhood's most valued
aesthetic feature. The replacement planting of 495.25
caliper inches of new trees is arithmetic compensation, not
functional replacement. A mature oak tree provides 15+
years of growth and character. New plantings do not
Design Review Board
Public Comment | July 6, 2026 Page 14
replicate that value. The DRB should recognize that forest
clearing for high-density development is an aesthetic loss
that cannot be fully mitigated through replanting
requirements. V. Economic Value and Neighborhood
Investment Residents of Grand Oaks have invested in their
homes with expectations shaped by neighborhood
character. Home values in residential neighborhoods
depend on visual stability and character preservation.
When a developer introduces a major multifamily project
with incompatible scale and design, existing homeowners
absorb an aesthetic loss they did not choose and cannot
easily remediate. A neighbor cannot renovate away a
four-story apartment building next to their property. They
cannot improve their home's visual context. They
experience a permanent diminishment of their investment's
setting. The DRB's mandate includes protecting "economic
value." That mandate applies to existing residents as much
as to developers. Approving developments that degrade
neighborhood character—and therefore neighborhood
property values—contradicts the board's core
responsibility. VI. The Board's Own January Concerns In
January, the Design Review Board itself expressed
concerns about this project's compatibility: - Board
member David Meeks struggled with the height and
massing. - The board requested design adjustments,
including color modification of the pool house. - Residents
testified repeatedly that the design does not fit the
neighborhood. - The board was unable to reach consensus
on conceptual approval—a clear signal of design
concerns. These concerns have not been resolved. The
developer's presentation framed the project as "meant to
feel as residential as possible" and "Lowcountry
vernacular"—language that reveals the design team
understands the fundamental incompatibility and is
attempting to manage it through framing rather than
redesign. The board should not grant conceptual approval
to a project it already identified as having significant
design compatibility concerns. VII. Recommendations 1.
Deny conceptual approval in its current form. The scale,
massing, and architectural treatment are fundamentally
incompatible with Grand Oaks' established aesthetic
character. 2. Require substantial redesign for height,
massing, and scale. If the site is to be developed, it should
be developed at a scale consistent with the surrounding
neighborhood—primarily one- to two-story residential
structures. This is not a request to prevent development. It is
a request that development respect the scale context of its
setting. 3. Require preservation of significant forest
canopy. The existing forest is a defining element of Grand
Oaks' visual character. Require the developer to modify
site planning to preserve existing forest where feasible
and to avoid wholesale clearing for parking and
Design Review Board
Public Comment | July 6, 2026 Page 15
hardscape. 4. Require authentic architectural
compatibility, not simulated vernacular. The project should
demonstrate genuine architectural fit with Lowcountry
residential character, not apply surface details to
incompatible forms. 5. Require visual impact analysis.
Before reconsidering this project, require a professional
visual impact assessment showing sightlines from nearby
residences, seasonal views, and cumulative visual impact of
the development on the neighborhood streetscape and
residence views. VIII. Conclusion The Design Review
Board's mandate is to protect and improve the visual and
aesthetic character and economic value of development
within Charleston. Grand Oaks residents have built a
neighborhood defined by modest scale, preserved forest,
and residential character. They have invested in that
neighborhood with expectations shaped by its visual
identity. The proposed development contradicts that
character at every scale: height incompatible with
surrounding homes, massing that creates visual jarring,
forest clearing that removes defining landscape features,
and design that requires "Lowcountry vernacular"
language to mask its fundamental incompatibility. The
board's own January discussion flagged these exact
concerns. The board should honor those concerns and
require redesign that respects the visual character and
economic value of the existing neighborhood. I urge you
to deny conceptual approval and require substantial
redesign on scale, massing, forest preservation, and
architectural authenticity before reconsidering this project.
Respectfully, Dan Gracie 260 Gazania Way Charleston,
SC 29424 (843) 278-0256 dangracie@gmail.com —
Sources and References City of Charleston (2021). Design
Review Board Guidelines and Standards. City of
Charleston Design Review Board (January 6, 2026).
Meeting Minutes and Board Discussion—350 Grand Oaks
Boulevard Development. Live5News (June 3, 2026).
Charleston board approves removal of 22 historic oak
trees for apartment complex. Post and Courier (January
6, 2026). Another 400 apartments, townhomes proposed
behind West Ashley grocery store. Professional visual
impact assessment standards and best practices for
neighborhood design compatibility analysis.
Liz Munn 3631 Morse
Avenue, Johns
Island, SC
29455
This project has obtained approval for removal of grand
trees with the variance granted with conditions regarding
the circumstances. The current packet shows replacement
canopy trees that are not appropriate for hurricane
survival, will not be considered protected in the future, and
meet aesthetic needs only. Shumard Oak, Nuttal Oak, and
Pin Oaks are described as being wind sails. A more
resilient choice would be Bald Cypress for wet areas and
Live Oaks. The removal of so much should result in the
Jun 29
2026
3:25PM
Design Review Board
Public Comment | July 6, 2026 Page 16
responsibile replacement of trees which will stand up to the
conditions of the lowcountry.
Charles Stricklin Sr 330 Cabrill
Dr.
Charleston,
SC 29414.
This purposed development of 4 story, 348 units, 33
townhomes, 6 garages and clubhouse is very much
opposed by my neighbors and myself. The addition traffic
from this complex will just be a big mess! No only will there
be additional congestion but emergency vehicles will have
a terrible time getting to anyone or locations during rush
hours. Flooding conditions will surely be elevated with all
the additional concrete and asphalt. This is a flood prone
area as it is. The loss of large trees will cause the ground
to become saturated very quickly during heavy rain
events. I have talked with District 10 Rep. Stephen Bowden
and the mayor’s aide Hampton Logan IV. They both argue
that this is in the master plan for this area call; Long
Savannah. This plan is a old plan they say. Plans can be
changed, they are all the time. There are enough
apartments available now and others are being built as of
this writing. If you haven’t visited this area in the past year
or so please do. This complex is just not needed, it’s all
about money. The powerful families like the Rivers and
others just want more money. They don’t live where this will
be built so they don’t care one iota. Please stop this
madness! The traffic that will be created will be a
nightmare. This is not a job creator or good for economic
development as developers and politicians like to say. It
all about money!!!
Jun 29
2026
7:11PM
Carlos Bright 310 Grouse
Park,
Charleston
SC 29414
I am opposed to the project due to it's negative impact on
the community and surrounding areas. This project does not
have a site plan that offers a buffer to nearby
neighborhoods. Our neighborhood in particular will be
directly backed up to tall multi-family building with no
buffer whatsoever. The development consists of large 4
story buildings with only a few townhomes along the street.
This should be rethought / redesigned to swap that and
provide more single family homes rather than apartments.
The neighborhood is currently 100% single family homes
and townhomes. Placing a massive amount of rental
properties in the area will change the demographics
relating in more noise, crime, etc. There will also be an
influx of cars on an already over-burdened street (Grand
Oaks Blvd). This street at the Bees Ferry intersection
already backs up all day. This traffic light, and the lack of
enough turning lanes etc in the immediate area causes a
lot of traffic and quite a bit of road rage. This area is a
nice, quiet neighborhood and this development will only be
detrimental to that peace. No one wants it here, and there
is certainly no reason for it to be here. There are too many
new apartments in the area already. I would guess there
have been more than 1500 units built in the last 5 years
and absolutely NO new roads to handle them. The added
lane to Glenn McConnell is not enough to help especially
Jun 30
2026
8:25AM
Design Review Board
Public Comment | July 6, 2026 Page 17
since there was no improvement to Bees Ferry. This is just a
bad idea no matter how you look at it. It only helps the
developer, no one else. Maybe consider whether the other
apartments are at full capacity before allowing this to
happen.
Nicole Heugel 217
Brambling
Lane
Charleston
SC 29414
Before granting conceptual approval, I believe the
Planning Commission should take a closer look at the
project's density, infrastructure demands, environmental
impacts, and compatibility with existing neighborhoods.
Although this development has been discussed for years,
the surrounding community has changed significantly, and
the project should be evaluated based on current
conditions rather than assumptions made decades ago.
Many nearby residents were not directly notified of the
proposal or informed of opportunities to provide
feedback. Given the size and potential impact of this
development, meaningful community engagement should
occur before any conceptual approval is granted. My
primary concern is the proposed density, particularly the
apartment units planned adjacent to existing
neighborhoods. A lower-density design with more
townhomes, greater setbacks from existing homes, and the
preservation of additional green space and mature trees
would be more compatible with the surrounding community.
The proposal also raises concerns regarding traffic, road
safety, stormwater management, flooding, wildlife habitat,
wetlands, and overall environmental impacts. These issues
deserve careful evaluation before moving forward. In
addition, the area is already experiencing growing
pressure on roads, utilities, schools, healthcare facilities,
emergency services, and other public infrastructure. It is
unclear whether these systems can adequately support the
additional population this development would bring.
Growth should be planned responsibly and in a manner
that protects both current and future residents. For these
reasons, I encourage the Commission to reconsider the
scale and density of the proposal and require
modifications that better address infrastructure,
environmental preservation, and compatibility with the
surrounding community before granting conceptual
approval.
Jun 30
2026
9:24AM
Design Review Board
Public Comment | July 6, 2026 Page 18
Other Comments:
2 Comments Submitted:
• Shannon Wolcott, 139 Toura lane
Submitted to Innovate Site on June 28, 2026 12:34 PM
No more housing. Too much traffic. Use that land to make a road going from Glen Mc
Connell to Summerville to ease up traffic on 61 where they cannot add more lanes .
So many acccidents on the black hole of 61 from bees ferry to Dorchester rd. Many
deaths
• Donna McClain, 2475 Wensley Drive
Submitted to Innovate Site on June 28, 2026 1:31 PM
West Ashley is currently a complete nightmare with regards to traffic. One minor
fender locks up Hwy 17 and 61. Each new subdivision will cause more devastating
flooding which we are already suffering due to over development. Please do not
allow any further building until our infrastructure can properly support it. At present
our infrastructure is about 20 years behind.