RecordWell Data

DRB Meeting Results

City of Charleston · Berkeley County · meeting of Jul 6, 2026 · Agendas

Open the original document More from City of Charleston

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

CITY OF CHARLESTON DESIGN REVIEW BOARD MEETING RESULTS JULY 6, 2026 4:30 P.M. 2 GEORGE STREET BOARD MEMBERS PRESENT: Bill Eubanks, Lucas Boyd, Stephanie Tillerson, Jeff Johnston STAFF MEMBERS PRESENT: David Meeks, DRB Administrator; Brad Thomas, Staff Architectural Planner A. APPLICATIONS 1. 1798 Ashley River Rd. West Ashley | Council District 9 | TMS# 351-07-00-002 | DRB2026-000355 Requesting approval of staff denial of a sign package that uses gradient colors for their signage. Owner: Jupiter Holdings Applicant: Kimberly Hunt/Supreme Sign Services. DECISION: APPROVED MOTION: Request to appeal staff decisions to deny a sign color was approved. Applicant may proceed with their proposed gradient colors. MADE BY: Tillerson SECOND: Boyd VOTE: FOR: 4 AGAINST: 0 2. 3041, 3025, 3015 Reva Ridge Dr. Johns Island | Council District 3 | TMS# 313-00-00-584, 585 | DRB2026-000357 Requesting conceptual approval for three new 3-story multi-family buildings. Owner: Crowne at Live Oak Sq. Phase 2 Applicant: Spencer Plowden DECISION: APPROVED MOTION: Conceptual approval with Board comments to provide more consistency in the roof plane, and to work on the proportioning of the architecture of the tower elements. MADE BY: Johnston SECOND: Boyd VOTE: FOR: 4 AGAINST: 0 Design Review Board Meeting Results | July 6, 2026 Page 2 3. 3930 West Ashley Circle West Ashley | Council District 5 | TMS# 301-00-00-819, 469 | DRB2026-000356 Requesting preliminary approval for a single-story shell retail building. Owner: Bees Wedge, LLC Applicant: LFK Architects, LLC DECISION: APPROVED MOTION: Preliminary approval with FRBS MADE BY: Boyd SECOND: Johnston VOTE: FOR: 4 AGAINST: 0 4. 2110 Ashepoo Ln. UP | Council District 4 | TMS# 464-06-00-011 | DRB2026-000362 Requesting Preliminary approval for a new 4-story storage building. Owner: JEAL-K Associates LLC Applicant: SeamonWhiteside and Assoc DECISION: APPROVED MOTION: Preliminary approval with staff comment #1 and final review by staff MADE BY: Boyd SECOND: Johnston VOTE: FOR: 4 AGAINST: 0 STAFF COMMENTS: 1. The one staff comment from the previous meeting was to add to the dry pond planting to create a strong buffer/garden. The “landscape rendered site plan” from the last meeting is what we were asking to add onto and beef up. The current plan looks to be less plantings than the last schematic plan. The upper screening is good with the Live Oaks and the Crepe Myrtles, but at the low level there are only two rows of ornamental grasses and the rest is lawn grass in the center. Staff recommends continuing down the slope with more plantings. A couple more rows of ornamental grasses and some water tolerant native shrubs of different variety would be good. And/or perhaps a band of natural, no mow mix with wildflowers. This could be for the entire pond center, or we could also support just an additional band of planting inside the proposed grasses, and to keep the center of the pond lawn grass. STAFF RECOMMENDATION: Preliminary approval with the condition noted and FRBS. Board comment regarding staff comment # 1 above, was to keep the additional plantings, simple. Design Review Board Meeting Results | July 6, 2026 Page 3 5. 3943 West Ashley Circle West Ashley | Council District 5 | TMS# 301-00-00-469 | DRB2026-000360 Requesting preliminary approval for a new 1-story McDonalds. Owner: Whitefield Construction Co Applicant: McDonalds USA LLC DECISION: APPROVED MOTION: Preliminary approval with staff comments 1 and 2, and Board comments, 1) to close off the service area and make the screen fence opaque and landscape the drive side of the fence. 2) to extend the canopy that is proposed over the patio, down the entire north façade, as opposed to the broken canopy on the current plans. And final review by the Board. MADE BY: Johnston SECOND: Boyd VOTE: FOR: 4 AGAINST: 0 STAFF COMMENTS: 1. Staff questions again if the center loading area is essential and must remain. If so, staff cannot accept this area to be stamped concrete. The look of this material is not good. Staff ask that the material of this area be studied. Grass Crete interlocking pavers is our 1st recommendation, which can be engineered to withhold the weight of WB-67 delivery trucks. Our 2nd recommendation would be another interlocking pervious or decorative type paver over concrete. 2. Dominion will not permit a screen wall in the easement area. The applicants have added 2 rows of Dwarf hollies. Staff ask that this area within the property lines, between the parking lot and streets, gets another layer of landscape added with some varying heights and shrub variety. 3) Study the location and the materiality of the service drive. Board recommends it being a “pull off drive” parallel to the south entry drive. (pending Dominion OK) 6. Grand Oaks, just NW of W. Ashley Circle West Ashley | Council District 10 | TMS# 301-00-00-052 | DRB2026-000361 Requesting conceptual approval for a new multi-family community with seven 4-story buildings containing 348 units, 33 townhomes, 6 detached garages and a clubhouse. Owner: Middleburg Communities Applicant: Mark Ward DECISION: APPROVED 1st MOTION: conceptual approval with staff comments #s 1, 2 (revised below), 4, 5 , 6, 12 and Board comments, 1) restudy of architectural expression throughout, with an emphasis on the material pallet, with special focus on the townhomes 2) MADE BY: Boyd SECOND: no second VOTE: FOR: 1 AGAINST: 3 DECISION: DEFERRED 2nd MOTION: Deferral, with all the Board and staff comments in the 1st motion Design Review Board Meeting Results | July 6, 2026 Page 4 MADE BY: Johnston SECOND: no second VOTE: FOR: 3 AGAINST: 1 STAFF COMMENTS: 1. Staff recommends relocation the mail kiosk building more site central and out of the view of the entry arrival. We feel this space would greatly improve the entry experience if this were instead green space and a view to the apartment building behind. Restudy the mail kiosk location. 2. Regarding the entry arrival experience off of Grand Oaks, we feel this entry could be improved. Study the arrival experience. Staff recommends a roundabout with a specimen tree in the middle. End of the townhouse facing the entry drive needs to be enhanced. Perhaps a balcony, and additional windows. 3. Based on some of the Board comments at the courtesy review, staff agrees that the overall massing is still too great and agrees that some areas of the apartment buildings should step down to 3 stories. Our recommendation would be to focus this around the 2 entries. Perhaps the east ends of buildings 1 and 7, drop down to 3 stories, so that the Clubhouse is framed with the 3 story ends of building 1 and 7. This drop to 3 stories could be studied in other areas as well but at a minimum in reducing massing, near the entries are where we recommend the strongest. 4. Staff recommends improving the pedestrian circulation even more, by adding a soft path around both detention ponds. Hugging the edge between the ponds and wetlands, crossing the entry drive in front of the Clubhouse. 5. Staff recommends adding to the pond planting edges with natives plugs/shrubs and wildflowers seed mixes. 6. Staff recommends a 6 ft. ht. opaque fence along the west property line, located closer to the parking with most of the plantings on the streetside of the fence. 7. Staff recommends a brick base on all the buildings. 8. Study the apartment buildings that have B&B on the top floor. Staff recommends simplifying the materials and making this top floor more of the same horizontal siding but perhaps the light blue or grey to distinguish the top floor. 9. Staff recommends not using B&B on the entire 2-story ends of the townhomes (sheet SD60) If B&B is used on the townhome end units, staff feels it should only be used in the gables as shown on sheet SD 54 (avoid vertical B&B on the apartment buildings) 10. Staff recommends not having a continuous fence along Grand Oaks and suggest only fencing the AC units. 11. Eric Schultz mentioned a tree-save area in the NW corner of the site that was agreed on, that he is not seeing in the current plans. Please confirm. 12. The applicants are over the # of Zoning required parking spots. We ask that they study the removal of any parking spaces that would open up any more green space. If keeping these parking #s, DRB requires some of your paved areas to be pervious. (at a min. equal to the sq. footage of parking spaces applicant is over what Zoning requires) Another suggestion is to change all the straight in parking along the west property line to parallel parking to increase the width of the buffer along the west property line. Design Review Board Meeting Results | July 6, 2026 Page 5 B. MINUTES 1. Review of Minutes from the 6.1.26 Meeting DECISION: APPROVED MOTION: Minutes approved MADE BY: Johnston SECOND: Boyd VOTE: FOR: 4 AGAINST: 0

Source: City of Charleston website. First collected Oct 31, 2026.