Committee on Public Works and Utilities Agenda
City of Charleston · Berkeley County · meeting of Jun 15, 2026 · Agendas
Open the original document More from City of Charleston
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
WILLIAM S. COGSWELL, JR
Mayor
V|àç Éy V{tÜÄxáàÉÇ
fÉâà{ VtÜÉÄ|Çt
Chair: Keith Waring
Vice Chair: Boyd Gregg
Members: Michael Seekings, Kevin Shealy, Leslie Skardon
MANDI HERRING
Interim Section Chief –
Planning, Permitting, and
Engineering
ROBERT SOMERVILLE
Section Chief – Public Works
PUBLIC WORKS AND UTILITIES COMMITTEE
AGENDA
There will be a meeting of the Public Works and Utilities Committee on June 15, 2026 to begin at 5:00
pm. The following items will be heard via call-in number 1-929-205-6099 and access code 592 385
519:
A. Invocation
B. Approval of Public Works and Utilities Committee Minutes
May 21, 2026
C. Request to Set a Public Hearing
None
D. Old Business
None
E. Acceptance and Dedication of Rights-of-Way and Easements
1. Del Webb Point Hope Phase 2 – Poletimber Ct. (50’ R/W), Bottomland Dr. (50’ R/W),
Woodmill Rd. (50’ R/W), Caliper St. (50’ R/W), Firewood Way (50’ R/W), Bay Strip Dr. (53’
R/W), Sawtimber St. (50’ R/W), Wright Brothers Dr. (53’ R/W)
a. Title to Real Estate
b. Exclusive Stormwater Drainage Easement Agreement
c. Affidavit for Taxable or Exempt Transfers
d. Plat
2. Rhett’s Cove Townhomes – Atherton Way ( 23’ R/W), Fernbank Road (50’ R/W),
Thornwell Dr. (55’ R/W), Laurelhurst Ln. (50’ R/W)
a. Title to Real Estate
b. Exclusive and Non Exclusive Stormw ater Drainage Easement Agreements
c. Affidavit for Taxable or Exempt Transfers
d. Plat
3. Contract between SCDOT, Charleston County and the City stating the City intends to
maintain the boardwalk and the RRFB/s that are part of the Central Park and Riverland Dr.
Intersection Improvement Project. (deferred from 05/21/26)
4. Acceptance of multi-use path easement (2944 Maybank), TMS #312-00—00-103, 312-00-
00-104, and 312-00-00-105.
F. Temporary Encroachments Approved by Th e Department of Development Services (For
information only)
1. 536 Carters Grove Rd. – Installing fence encroaching into City maintained drainage
easement.
2. 1140 Peninsula Cove Dr. – Installing fence encroaching into City maintained drainage
easement.
3. 1242 Harriman Lane – Installing fence encroaching into City maintained drainage
easement.
4. 2048 Ten Point Dr. – Installing fence encroaching into City maintained drainage
easement.
5. 204 Twinleaf Court – Installing fence encroaching into City maintained drainage
easement.
6. 24 Gordan Street – Installing 4” drainage pipe in two locations encroaching into City right
of way.
7. 285 Meeting St. (Regions) – Installing flag sign encroaching into City right of way.
8. 2310 Henry Tecklenburg (Dominion Energy)– Installing monument sign encroaching
into City right of way.
9. 465 Meeting St. (Modern Italian) – Installing blade sign encroaching into City right of
way.
10. 210 Coming St. (TEM-PO) – Installing blade sign encroaching into City right of way.
11. 509 Spiral Ramp Ct. – Installing irrigation encroaching into City right of way.
12. 2089 UT Bear Swamp Rd. – Installing irrigation encroaching into City right of way.
13. 949 Fish Camp Rd. – Installing irrigation encroaching into City right of way.
14. 509 Spiral Ramp Ct. – Installing irrigation encroaching into City right of way.
G. Request for Permanent Encroachments
1. None
H. Public Service Department Update
1. Sidewalk Budget and IRF payout s presentation (Matt Alltop)
I. Department of Development Services Update
1. Acceptance of the memorandum of the agreement between the City of Charleston and
Courier Square III Owner, LLC regarding third party stormwater review to allow the
applicant to pay for the fees associated with the third-party review.
2. Approval of Addendum 4 to the Professional Services Contract with Ardurra Group, Inc.
(Previously names WK Dickson & Co, Inc.) for 3rd Party Plan Review.
J. Stormwater Management Department Update
1. Approval of Amendment #2 fo r Professional Services with Black & Veatch for $69,905 for
SW Utility Fee Account Management Services including bill calculation and program
support for the 2027 billing cycle
K. Miscellaneous Business
1. Authorization to add path fr om municipal golf clubhouse to Maybank Highway as part of
the existing NSSF underground project for the Municipal Golf Course
2. Consideration of appeal fil ed on behalf of the Villages of St. Johns Woods Homeowners
Association of City’s denial to accept financial responsibility for 10 streetlights along St.
Johns Woods Parkway.
Miles of Sidewalk
433
400
ExshawMaintained by the City
The City Maintains 433 Miles of Sidewalk.
These sidewalks can be concrete, brick or
bluestone
$450,000
$450,000
$300,000
$300,000
$275,000
$275,000
2025 Budget 2026 Budget
/g57/g54
Sidewalk Repairs
Historic Sidewalk
Repairs
Construction
supplies
* Last increase we received was in 2025 when the construction budget went from $215,000 to $275,000 *
Approximate
433
400
ExshawSidewalk costs
One standard 5’x5’ concrete sidewalk panel costs
the city about $360
One 5’x5’ Brick panel typically costs the city
approximately $600
One 5’x5’ bluestone panel costs the city
approximately $1,125
* These costs do not include labor *
$311,500
$242,177
$162,250
$692,000
$404,427
$1,003,500
2025 Payouts 2026 Payouts
/g57/g54
IRF TORT claim
payouts
IRF Lawsuit
payouts
Total IRF payouts
* Note IRF payments do not come from city funds *
Source: City of Charleston website. First collected Oct 31, 2026.