RecordWell Data

062520 Agenda 6pm

City of Darlington · Darlington County · meeting of Jun 24, 2020 · Agendas

Open the original document More from City of Darlington

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

T 1. 2. 3. 4. 5. 6. CITY OF DARLINGTON PUBLIC IIEARING 2020-2021 BUDCET THURSDAY JIINE 25, 2O2O BALDWIN GYM 6 PM Welcome- Mayor Curtis Boyd Prayer- Mayor Curtis Boyd Pledge of Allegiance Opening Remarks- Mayor Curtis Boyd Public Commenr 2020-2021 Budget Adjoum To: Darlington City Council From: Darlington City Manager Fre. 2020/2021 B:jdget The following changes have been made to the2020-2021B.ud,getl. The stom water department is now just the storm water firnd and can be fouad on page 65. The proposed stom water fees are as follows: Increase of$2.50 per molth per house ($4 to$6.50), and an increase of $3.50 per month per business ($5 to $8.50). We articipate collecting an additional $88,650. This would be enough fi]nding to cover the bond payment ($180,000), vaotor truck pa).ment ($30,000) and allow for $10,650 to be placed in resewe. The vactor truck operator would be an employee from the street department and the assistant would be a water department employee. The revenue line item for storm water has been removed from the general fund r€venue list. A11 departrnenti have had changes made in salaries as the State of South Carolina is not moving forward with a[ indease in state retirement contributions. Other expenditure changes have been made as follows: Legislative 500-215- Traveling Expenses reduced ftom $7,000 to $1,000 due to elimination ofthe MASC Araual meeting. Public Buildings- 580- 381- Building and Fixed Equipment increased from $8,369 to $11,686. 580-288- Paving, C&G, SW- $61,400 be moved to 2020-2021Jine item 580- 388 Paving, C&G, SW to be added to 2020-2021 total of $61,677 for a total of $123,077. Planning and Beautificanoi- 590- 273.3- Beautihcation Board changed from $2000 to $17,163. Some ofthe savings ftom the state retirement contribution were added here. Police Department- 600-101- Salaries- $6,000 added fiom 500-215 Traveling Expenses tohelpwithraisesforpoliceoffrcers.600-226-Inqeasedby$15,000to$90,000with revenue coming ftom savings from the state retireme[t conaibution reduction and fiom elimination of fi.rnding for 600-220 Electricity, Water, Gas from $4,000 to $0. Codes Deparhnent 620-272- Special Conhacts- Increased ftom $48,500 to $60,000 with revenue coming from savings fiom state retircm€nt contribution reduction. Sanitation D€partment- 640-10l- The oity mechanic has been rcmoved fiom the saniration deparhnent personnel roster. Garage Department 660- The City mechanic is back in Departrnent 660 as the Storm water depaxhnent is now the storm water Fund. Water/Sewer Deparhneti- 914T-277- Sewq Bed Repair has been increased to $232,090 with revenue coming from savings ftom state retirement contribution reduction. City of DarlinEton Ensineering Proiects East Broad Street Sewer Replacement - RIA Grant Replace 750 feet of sewer pipe at 20 feet deep, 5 manholes and 20 sewer services- An RIA grant was applied for and will soon be awarded for 5500,000. Estimated cost S1,080,000. Start Date: Odober 2020 Completion Date: lanuary 2021 Upgrade sewer pumping stations - Joe Lewis, Altel, Grove Hill, and Main The Joe Lewis station will be completely demolished and replaced and 3900 feet of new 6" force main will be installed. EDA srant = $7,214,320 RIA Grant = s294,000 Estimated cost s1,530,000. Start Date: December 2020 Completion Date: September 2021 , Farm Street Sewer Overflow lssues- Possible CDBG Grant Upgrade Allen Street sewer pump station and upgrade downstream sewer pipe segments to clear flows, Preliminary investigations are underway. Estimated cost not developed, Proiect Details East Broad StreetSewer Replacement- RIA Grant A section ofsewer pipe, atapproximately 20 deep, collapsed on East Broad Street between Vaughan and Ervin Streets causing roadwayfailure. lnitially, itwas determined that 400lfofsewer mainwillhave to be replaced (manhole to manhole) , with two new manholes and five new sewer services. An RIA grant was applied for and willsoon be awarded for5500,000. The project at that time was estimated to be 5750,000 with no engineering design needed. During the interim between RIA application and Award, more video inspection were made and it was discovered more piping had collapsed beyond the initial scope of project. The new piping cannot be successfully attached to the collapsed pipint, so more sewer pipe is planned to be replaced. This increases the scope of the project to replace 750 lfof piping and 20 sewer services to the residents. Also, engineering design is now required to determine how to attach the seNices to the sewer main that is 20' below ground. ltwasdecided to laya new8" sewerline shallowand pa rallel to the deep sewer main to attach allthe seNices. This new design has been submitted to DHEC for approval. The new construction estimate forthis plan is S1,080,000. South Darlinqton Sewer Pumo Station Renovations - EDA Grant An EDA grant was awarded forS1,517,9oo and an RIA Grant was awarded fdr S294,ooO forthis project. The project will upgrade four sewer pumping stations -Joe Lewis, Altel, Grove Hill, and Main. The internal piping in each station will be removed, replaced, and upsized. Each site will have a permanent on-site generator installed. The Joe Lewis station will be completely demolished and replaced. Also, 3900 lf of new 6" force main willbe installed from the Joe Lewis station to a manhole at "D" Ave and Third Street. This project is estimated to cost 51,530,000. Farm StreetSewer Overflow lssues A shallow existin8 manhole (18" deep) on Farm Street adjacent to Pine Villa8e overflows during heavy rain events. Sewage flow from this area is designed to flow into the Allen Street sewer pump station and is pumped into an existinggravity sewer main on xx Street. From thls point flow Eoes to a new 10" sewer main on D Avenue. We evaluated the system and determined that the Allen Street sewer pump station is not pumping at design capacity (only one pump)allowing sewerto backup in the manholes. We also noted restricted flow across S. Main and allthe way to D Avenue. City repair crews reported completing repairs between s. Main and D Avenue on the old deteriorated concrete sewer main. We sent COG a map ofthe areas alfected so they can the process for a CDGB 8rant. To address the issue with the shallow manhole on Farm Street, a possible solution is to directthe gravity flow to the nearby Limit Street sewer pump station and reroute the existing sewerforce main to a manhole nearthe Allen Street sewer pump station.

Source: City of Darlington website. First collected Oct 31, 2026.