04292021 FINAL FY2022 Proposed Budget
City of Westminster · Oconee County · meeting of Oct 24, 2023 · Budget documents
Open the original document More from City of Westminster
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Gateway to the Mountain Lakes Region
City of Westminster Draft
Budget FY2022
Schedule of events
• Priority Setting Workshop – January 26, 2021
• Expenditure Review Part 1 - February 16, 2021
• Utility Fund
• Electric
• Water
• Water Plant
• Sewer
• Expenditure Review Part 2 – March 16, 2021
• General Fund
• Solid Waste Fund
• Youth Recreation Fund
• Hospitality and Accommodations Tax Fund
• Revenue Review – April 20, 2021 - cancelled
• City Council Budget Workshop – April 29, 2021
• Public Hearing and 1st Reading – May 11, 2021
• 2nd Reading – June 15, 2021
Gateway to the Mountain Lakes Region
Summary of All funds
Gateway to the Mountain Lakes Region
Taxes and Fees -Rates
Millage (tax) – no increase
Electric – no increase
$7.00 “AMI” fee – renamed to “Meter Fee”
Water
• Inside city – no increase
• Outside city – increase margin from 34% to 40% (a 4.2% increase on per/1000 gal)
Sewer (pass through 15.2% increase from OJRSA)
• Inside city 15.2% increase
• Outside city 15.2% increase
• Garbage Fee
• 5% increase both inside and outside
Gateway to the Mountain Lakes Region
Included - Personnel
• No health insurance increases
• No workers comp increases
• 2% cola for all city employees
• Personnel additions
• Recreation Maintenance Supervisor $16/hr
• Code Enforcement Officer/Annexation Manager $16.35/hr
• Electric – Tree Trimmer $16/hr
• Water/Sewer Inspector and Locator $16/hr
Gateway to the Mountain Lakes Region
Highlights – Major expenses
• General Fund
• 5 Year Comp Plan Update (required by SC) $40,000
• Server Update $20,000
• Utility Fund Admin
• Riley Street Demo/Shop Improvements $80,000
• Lease Purchase Equipment $488,000
• Electric Fund
• Westminster Crossing $25,000 (electric materials)
• Water Plant Fund
• Sludge pump/backwash pump/filter bed replace $57,500
• Utility Non-Departmental
• Contingency $132,157
Gateway to the Mountain Lakes Region
Transfer Summary
• $496,296 Utility Fund Transfer to General Fund (6.6% gross revenue transfer)
• $154,314 General Fund Transfer to Youth Recreation
• $76,487 General Fund Transfer to Solid Waste
• $62,600 Htax Transfer to General Fund
• $111,621 Htax Transfer to Youth Recreation
Gateway to the Mountain Lakes Region
General Fund – revenue summary
• Estimated revenues are similar to FY2021
• Reduced Htax transfer from $106,000 to $62,600
• Tied to eligible expenses
• Transfer from Utility fund $496,296
• (for FY2021 it was $495,106)
General Fund – major expense summary
• Code Enforcement Officer/Annexation Manager $16.35/hr
• 5 Year Comp Plan Update (required by SC) $40,000
• Server Update $20,000
• Capital Outlay for PD roof $20,000
• Police and Fire staffing and O&M at FY2021 levels
Gateway to the Mountain Lakes Region
• Budget closely resembles pre-COVID levels
• Directing more eligible Htax directly to Youth Recreation rather than
running the Htax transfer through the General Fund
• Eligible capital expenses for Youth Recreation are budgeted directly in
Htax Fund
• Recreation Maintenance Supervisor $16/hr
• Increase in projected revenue $22,800
• Fund Balance appropriation of $266,121
• FY2020 fund balance $593,297
(would leave a balance of $327,176)
• Reduce transfer to GF from $106,000 to $62,600
• Transfer is tied to eligible activities
• Transfer to Youth Recreation $111,621
• Transfer is tied to eligible activities
Gateway to the Mountain Lakes Region
Htax – major expenses
• $25,000 for grant matches
• $40,000 for community grants (current requests are $69,800)
• $50,000 lighting for old practice field
• $100,000 capital projects
• Lights at pool field
• Dug outs
• Playground equipment
• Anderson Park
• Pool property
• Owens Field
Gateway to the Mountain Lakes Region
• 5% increase in inside and outside rates
• Inside $18.40 $19.32
• Outside $24.15 $25.36
• Transfer from GF reduced by $9,905
• Moves closer to the cost-to-serve model
Gateway to the Mountain Lakes Region
Current monthly fee Proposed monthly fee
Gateway to the Mountain Lakes Region
Utility Fund
Revenue Expenses difference
Admin $ 997,119 $ 1,636,723 $ (639,604)
Electric $ 4,298,000 $ 3,429,122 $ 868,878
Water $ 1,956,500 $ 1,484,107 $ 472,393
Sewer $ 721,740 $ 902,342 $ (180,602)
Non Dept $ - $ 521,065 $ (521,065)
$ 7,973,359 $ 7,973,359 $ -
Gateway to the Mountain Lakes Region
Utility Fund: Fees - Rates
Electric – no increase
$7.00 “AMI” fee – renamed to “Meter Fee”
Water
• Inside city – no increase
• Outside city – increase margin from 34% to 40% (a 4.2% increase on per/1000)
Sewer (pass through 15.2% increase from OJRSA)
• Inside city 15.2% increase
• Outside city 15.2% increase
Gateway to the Mountain Lakes Region
Inside/Outside differential
Gateway to the Mountain Lakes Region
Walhalla Seneca Westminster
water base 96% 26% 77%
water per 1,000 54% 34% 34%
sewer 0% 33% 17%
sewer per 1,000 51% 34% 6%
solid waste 42% 22% 31%
OJRSA rate increase pass through
base per/1000
SW Inside Residential $17.80 $6.01
$20.51 $6.92
SW Outside Residential $20.75 $6.35
$23.90 $7.32
Gateway to the Mountain Lakes Region
Utility Fund – expense review
• Utility Fund Admin
• Riley Street Demo/Shop Improvements $80,000
• Lease Purchase Equipment $488,000 (next slide more info)
• Electric Fund
• Westminster Crossing $25,000 (electric materials)
• Water Plant Fund
• Sludge pump/backwash pump/filter bed replace $57,500
• Utility Non-Departmental
• Contingency $132,157
• (1 day cash = $21,845; $132,157 = 6 days cash)
Lease/Purchase – Capital Utility Fund
(2) 4x4 pick up trucks (@ 6 years) $40,000/each
Brush hog (@ 6 years) $108,000
Bucket Truck (@ 8 years) $300,000
Annual Financing $71,194
Gateway to the Mountain Lakes Region
Inside Rates – Peer Comparison
Walhalla Rates Inside City
Water
First 2,000 Gallons $16.50
Per 1,000 Gallons $3.31
Sewer
Upto 1,000 Gallons $5.00
Per 1,000 Gallons thereafter $4.50
Electric (Per Duke Energy)
Base Fee/month $11.96
First 1,000 kWh per kWh $0.10179
All over 1,000 kWh per kWh $0.108691
Solid Waste $15.50
Seneca Rates Inside City
Water
Base fee/month $10.15
Per 1,000 Gallons $2.06
Sewer
Base fee/month
$11.98
Per 1,000 Gallons $4.77
Electric
Base fee/month $14.96
Per kWh $0.08246
Solid Waste $15.75
Westminster Rates Inside City
Water
Base fee/month $12.70
Per 1,000 Gallons $3.49
Sewer
Base fee/month
$17.80
Per 1,000 Gallons $6.01
Electric
Base fee/month $14.00
Per kWh $0.13690
Solid Waste $18.40
Outside Rates – Peer Comparison
Walhalla Rates Outside City
Water
First 2,000 Gallons $32.40
Per 1,000 Gallons $5.10
Sewer
Upto 1,000 Gallons
$5.00
Per 1,000 Gallons thereafter $6.80
Solid Waste $22.00
Seneca Rates Outside City
Water
Base fee/month $12.83
Per 1,000 Gallons $4.71
Sewer
Base fee/month
$15.94
Per 1,000 Gallons $6.39
Solid Waste $19.25
Westminster Rates Outside City
Water
Base fee/month $22.46
Per 1,000 Gallons $4.69
Sewer
Base fee/month
$20.75
Per 1,000 Gallons $6.35
Solid Waste $24.15
Westminster Rates Inside City
Water
Base fee/month $12.70
Per 1,000 Gallons $3.49
Sewer
Base fee/month
$17.80
Per 1,000 Gallons $6.01
Electric
Base fee/month
$14.00
Per kWh $0.13690
Outside Rates – Peer
Comparison
Westminster Rates Outside City
Water
Base fee/month $22.46
Per 1,000 Gallons $4.69
Sewer
Base fee/month
$20.75
Per 1,000 Gallons $6.35
Solid Waste $24.15
Pioneer
Water
Upto 3,000 Gallons $33.80
Per 1,000 Gallons thereafter $5.00
Blue Ridge
Electric
Base fee/month $28.50
Per Kilowatt Hour $0.12174
TESI
Water (Flat fee very month) $45.07
Sewer (Flat fee every month) $40.25
Rate Comparison
Gateway to the Mountain Lakes Region
Rate Schedule Comparison
Service Walhalla Seneca Westminster TESI Pioneer Blue Ridge
Electric (Inside) $127.23 $107.65 $167.88 - - $165.34
Water (Inside) $26.43 $20.45 $30.15 $ 45.07 $43.80 -
Water (Outside) $47.70 $36.38 $45.91 $ 45.07 $43.80 -
Sewer (Inside) $23.00 $35.83 $47.85 $ 40.25 - -
Sewer (Outside) $32.20 $47.89 $52.50 $ 40.25 - -
Solid Waste (Inside) $15.50 $15.75 $18.40 - - -
Solid Waste (Outside) $22.00 $19.25 $24.15 - - -
*All water and sewer rates are based on 5,000 gallons
*All electric rates are based on 1,124 KWH
*Electric rates in Westminster are based on the good neighbor rate
Entity
**Base fee
per month
Rate per
kilowatt
City of Seneca $14.96 $0.08246
Blue Ridge $28.50 $0.12174
City of Westminster $14.70 $0.14375
*City of Westminster GNR $14.00 $0.13690
Duke Energy $11.96 $0.10179 (Rate per kWh after 1,000 KW is $.108691)
*City of Westminster Good Neighbor Rate (GNR) applies to customers who opted in
to having a load management device put onto their air unit by the City to help control
usage during peak periods.
**All base fees do not include any kilowatt usage.**
Utility Fund
Gateway to the Mountain Lakes Region
Service Last date the rate was increased
Electric 10/1/2016
Water 11/1/2019
Garbage 7/1/2019
Sewer 6/1/2015
Thank you.
The End.
Gateway to the Mountain Lakes Region
Source: City of Westminster website. First collected Oct 31, 2026.