09-13-2022 AMENDED Agenda Packet
City of Westminster · Oconee County · meeting of Oct 9, 2013 · Agenda packets
Open the original document More from City of Westminster
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CITY OF WESTMINSTER REGULARLY SCHEDULED MEETING
September 13, 2022 @ 6:00 PM
Westminster Fire Department
216 Emergency Lane
AMENDED AGENDA*
(* items added to the Amended Agenda are noted with an “*” and in red type.)
Call to Order
Invocation & Pledge of Allegiance
Certification of Quorum
Public Comments:
The floor is now open for public comments. Citizens of Westminster or others who have registered for time with the Clerk can now address
Council for any matters on tonight’s agenda or other matters you wish to bring before the Council. Speakers are allowed up to 3 minutes and
possibly longer if that Speaker is recognized in advance as representing a larger group with similar concerns. In order to preserve the decorum of
this public meeting, and to allow adequate time for discussion among the elected membership of City Council, this will be the only time we will
receive unsolicited comments tonight from the public.
Public Hearing for Backflow Fees
Special recognition of City Utility Employee – Electric Department
Special Presentation by David McMahon of G Energy
Comments from the Mayor and Council
Old Business
1. Second Reading of ORDINANCE NO. 2022-09-13-01- AUTHORIZING AN EQUIPMENT
LEASE PURCHASE AGREEMENT IN THE AMOUNT OF NOT EXCEEDING $415,000
BETWEEN THE CITY OF WESTMINSTER, SOUTH CAROLINA, AND TRU1ST BANK,
A NORTH CAROLINA BANKING CORPORATION, TO DEFRAY THE COST OF
ACQUIRING CERTAIN EQUIPMENT; AND OTHER MATTERS RELATING
THERETO.
(This ordinance is to authorize the financing agreement with Truist Bank to
lease/purchase the following vehicles.
1) One electric line truck for $265,000 for 8 years at 3.43% interest + $7,500
closing costs
2) Two police vehicles and one fire vehicle for $135,000 (total) at 3 years at
3.29% interest + $7,500 closing costs
The purchase of these vehicles were approved in the FY2022-2023 Annual Budget. City
Council authorized the purchase of the vehicles at the August 9, 2022 Regular City
Council Meeting.
Staff recommends approval.)
2. Second Reading ORDINANCE NO. 2022-09-13-03, AN ORDINANCE AMENDING THE
CITY OF WESTMINSTER’S SCHEDULE OF FEES, REFERRED TO AS THE CLERKS
RECORD, TO INCORPORATE BAKFLOW TESTING FEES
(The South Carolina Department of Health and Environmental Control (SCDHEC) monitors
the operations and maintenance of the City’s sewer system. SCDHEC requires sewer lines to
have backflow devices on customer sewer lines and requires periodic testing and proof of
those tests to be maintained by the City. To better manage this process, City staff recently
became certified to perform the required tests on the backflow devices. Customers may use an
independent contractor certified in performing the tests. If Council agrees to the adoption of
this fee, the customers will have an additional choice.
The fees requested are:
¾ -1” Residential $110.00 - $150.00
2”-4” $120.00 - $160.00
6”-18” $150.00 - $200.00
Pits that Require Confined Space entry $120.00 $140.00 plus testing cost for size of
backflow
Average Cost for a plumber:
¾-1” $60-$150
2”-4” $70-$160
6”-18” $80-$200
Confined Space $100-$140
Staff recommends approval.)
3. Second Reading ORDINANCE NO. 2022-09-13-05, AN ORDINANCE AMENDING THE
CITY OF WESTMINSTER’S BUDGET ORDINANCE, AN ORDINANCE MAKING
APPROPRIATIONS FOR CERTAIN EXPENSES, CAPITAL IMPROVEMENTS AND
INDEBTEDNESS OF THE CITY OF WESTMINSTER, SOUTH CAROLINA FOR THE
FISCAL YEAR BEGINNING JULY 1, 2022 AND ENDING JUNE 30, 2023
(At the June 14, 2022 City Council Meeting, City Council discussed and consented to the
utilization of unused Police Department salary funds to provide salary increases to Police
Officers in order to incentivize Police Officer retention and recruitment. As a part of the
same discussion City Council consented to utilize uncommitted funds from the Police
Department salary line item to provide for increases to Fire Department firefighters. Again,
this is to incentivize retention and recruitment, this time with the City’s firefighters. In order
to move the $94,000 necessary to complete this plan, a budget amendment is required.
Staff recommends approval.)
4. * Second Reading AGREEMENT FOR THE TRANSFER OF WATER LINE BY AND
BETWEEN PIONEER RURAL WATER DISTRICT OF OCONEE AND ANDERSON
COUNTIES AND CITY OF WESTMINSTER
(The City and Pioneer Water District have negotiated the sale by the City to Pioneer for a
water line along SC HWY 24. At the June 6, 2022 City Council Meeting, Council passed first
reading of the agreement for a one-time, lump-sum payment for the water line in the amount
of $71,500 rather than a 10 year amortized payment. After the first reading, notes from both
sides were incorporated into the agreement.
Staff recommends approval.)
New Business
5. First Reading of ORDINANCE NO. 2022-10-11-01; AN ORDINANCE AUTHORIZING
AND ESTABLISHING AN ECONOMIC DEVELOPMENT INCENTIVE PROGRAM TO
ENCOURAGE PRIVATE INVESTMENT IN THE INCENTIVE AREA OF THE CITY OF
WESTMINSTER, SOUTH CAROLINA; AUTHORIZING AND ESTABLISHING A
PROGRAM TO GRANT SPECIAL PROPERTY TAX ASSESSMENTS TO CERTAIN
REHABILITATED HISTORIC PROPERTIES; AND OTHER MATTERS RELATED
THERETO.
(On August 16, 2022 City Council participated in a discussion with Attorney Lawrence
Flynn of Pope Flynn to develop an Economic Development Incentive Program to
encourage private investment within the City limits.
The ordinance contains multiple provisions. Of note are:
Adoption of the Bailey Bill which provides for certain procedures that the City
and the owner of qualifying historic property must follow in order to receive the benefits
of the Bailey Bill.
Authorization of incentives which include:
(i) Up to 100% of the applicable tap fees collected by the City;
(ii) Up to 50% of the building permit fees collected by Ocone e
County on behalf of the City;
(iii) Up to 50% of the business license fees collected by the City for
as many as five (5) years;
(iv) Up to 50% of the local hospitality taxes collected by the City for
as many as five (5) years, but funds received through such Incentive are to be
spent only for purposes that are related to tourism, pursuant to S.C. Code § 6-1-
730, and which have been approved by Council and included in the Incentive
Agreement;
(v) Up to 50% of the local accommodations taxes collected by the
City for as many as five (5) years, but funds received through such Incentive are
to be spent only for purposes that are related to tourism, pursuant to S.C. Code §
6-1-530, and which have been approved by Council and included in the Incentive
Agreement; and
(vi) Such other Incentives that the Council, at its discretion on a
case-by-case basis, determines are appropriate given the amount or type of
investment made by the Incentive Recipient in the Incentive Area)
Further:
(i) State Incentive Programs
a. The Abandoned Building Act
b. Textiles Revitalization Act
(ii) Minimum Investments for eligibility
(iii) Length and amount of the incentives
(iv) Area within the City limits to which incentives apply
(v) Council authorization and certification of incentives
Staff recommends approval.)
6. First Reading of ORDINANCE NO. 2022-10-11-02; AN ORDINANCE APPROVING THE
EXECUTION AND DELIVERY OF A POLE ATTACHMENT LICENSE AGREEMENT
BY AND BETWEEN THE CITY OF WESTMINSTER, SOUTH CAROLINA AND
SPECTRUM SOUTHEAST, LLC AND OTHER MATTERS RELATED THERETO.
(Spectrum Southeast, LLC requested the right to attached its communications equipment
(aerial cables, wires and other facilities related thereto) to City-owned utility poles. This
activity is presented to the Council for consideration as a Pole Attachment License
Agreement. The agreement was negotiated by the City’s legal representative Pope Flynn. The
technical specifications were reviewed and approved by the City’s Utility Director.
The term of the agreement is five (5) years. The technical specification detail considerations
such as location on the pole, arrangement of the wires, insurance of the company and
compensation to the City for each pole used, to name a few. The cost is $21.00 per pole.
This is a non-exclusive attachment agreement. Currently, AT&T, Vyve and Blue Ridge
electric Cooperative (for UpCountry Fiber) have pole attachment agreements with the City.
These agreements are of benefit to the citizens of the City in that it promotes competition for
communications services and compensates the City of the use of the City-owned poles.
Staff recommends approval.)
7. *First Reading of ORDINANCE NO. 2022-10-11-03; AN ORDINANCE DELETING
CERTAIN PROVISIONS OF TITLE III, CHAPTER 35 OF THE CITY OF
WESTMINSTER CODE OF ORDINANCES PERTAINING TO ITS PURCHASING AND
CONTRACTING POLICY; ADDING TITLE III, CHAPTER 38 TITLED
“PROCUREMENT”; AND OTHER MATTERS RELATED THERETO.
(At the request of staff, Pope Flynn developed a revised Procurement Policy. Generally
speaking, this policy provides for a modern approach to procuring goods and services as
needed by the City, it complies with South Carolina state law. For the city staff, it adds
flexibility and efficiencies to the procurement process. For additional security, the City
Council is often the final decision maker. The policy adds additional language for
performance bonds – which require a financial bond upfront to ensure a contractor
completes the work to which it was hired.
The local vendor preferences is written to reflect the local nature of the upstate of South
Carolina; however, City of Westminster businesses are given the greatest amount of
preference then those in Oconee County. See section 38.22 Local vendor Preference. The
Exceptions To Bidding, Section 38.26 incorporates flexibility to negotiate with prospective
contractors or consultants for the most efficient delivery of construction projects. These new
provisions allow the City to keep pace with the modern environment for procuring and
securing goods and services.
Staff recommends approval.)
8. First Reading of AMENDMENT NO. 4 TO THE LOAN AGREEMENT; CONSERFUND
LOAN NUMBER 4-201-19 BETWEEN THE CITY OF WESTMINSTER AND THE
SOUTH CAROLINA OFFICE OF REGULATORY STAFF ENTERED INTO ON THE
26
TH DAY OF FEBRUARY 2019, AMENDED NOVEMBER 19, 2019, MAY 31, 2019
AND JANUARY 17, 2022; AMENDED FROM $414,556.00 TO $369,947.23; AND
HEREBY AMENDED TO OCOTBER 31, 2022 FOR CERTAIN WATER SYSTEM
IMPROVEMENTS TO INCREASE OPERATING EFFICIENCIES; AND OTHER
MATTERS RELATED THERETO
(In 2019, the City entered into a loan agreement with the South Carolina Office of
Regulatory (SCORS) staff for the purchase and installation of six Variable Frequency
Drive (VFD) pumps. The pumps are intended to increase the efficiency of the operations
of the water system and save electricity. The final two VFD pumps were finally installed
in August 2022 and are set to be operational within the next three weeks. SCORS is eager
to close the loan agreement. The loan amortization schedule is provided as Exhibit A of
the agreement. Repayment will take place at the rate of $40,114.92 per year for the next
ten (10) years.
The attached agreement provided in this agenda is Amendment No. 3. The final
agreement, Amendment No. 4, will be provided at the second and final reading. The only
terms expected to change between Amendment No. 3 and Amendment No. 4 is the closing
date, referred to as “the completion of the construction phase to be June 30, 2022,”
which will amend to “the completion of the construction phase to be October 31, 2022.”
Staff recommends approval.)
9. Consideration of RESOLUTION NO. 09-13-2022-01; A RESOLUTION PLEDGING TO
PRACTICE AND PROMOTE CIVILITY IN THE CITY OF WESTMINTSER
(Members of City Council and city staff attended the MASC Annual Meeting in July. One
of the themes of the meeting was the practice and promotion of civility in public
discourse. This Resolution is provided by the MASC as a “best practice.”)
10. Consideration of RESOLUTION NO. 09-13-2022-02; A RESOLUTION AUTHORIZING
THE CITY OF WESTMINSTER TO PASS THROUGH THE FEES FOR CREDIT CARDS,
DEBIT CARDS AND ANY OTHER FEE-BASED FINANCIAL TRANSACTIONS TO
THE USER; AND OTHER MATTERS RELATED THERETO
(At some point in the last five years, the City stopped the pass-through of financial fee-
based transactions (sometimes referred to as Convenience Fees) and began absorbing
the costs of those financial transaction fees on behalf of the customer. An analysis of the
last one-year period revealed the cost to all City customers to be more than $58,000. As a
result, all City customers pay a percentage of the cost whether they utilize a credit card,
or similar device, or not.
The institutions offering the credit card services set the fees. Currently the City accepts
MasterCard and Visa because the fees for other credit cards are higher than these two.
Should Council adopt the resolution, any credit card type can be accepted since the cost
of the transaction will be bore by the user. The transaction cost collected by the City will
be cost-neutral to the City.
October 10, 2022 is set as the date to begin the pass-through of the fees. This timeframe
allows time to notify customers of the change. Additionally, the logistics of programming
City financial software to collect the appropriate fees will take coordination with the
City’s financial software provider. To ensure all collection methods (online payments,
automated telephone payments and in-person payments) are synchronized, additional
time may be needed past October 10
th. For this reason the resolution contains language:
“beginning October 10, 2022 or as soon thereafter as may be logistically practical.”
Staff recommends approval.)
11. Consideration of LOAN RESOLUTION, RUS BULLETIN 1780-27
(Since 2020 City staff and City Engineer, Troy Rosier, have worked to develop a water
system improvement program. The program consists of upgrades to existing lines to
include 33,200 linear feet (LF), 10", 42,200 LF 8", and 10,800 LF 6", throughout the
City’s water distribution system. A 40,000-gallon ground storage tank will be replaced
with a 250,000-gallon ground tank. These improvements will increase access to City
water, improve water flow to areas with low water flow, loop water lines which will
increase water delivery reliability, replace lines that have maintenance issues, add a new
water tank to provide better water pressure, along with other benefits to the customers.
The United States Department of Agriculture – Rural Development office (USDA-RD)
recently approved the City’s request for a low interest loan to fund the water system
improvement program. The USDA-RD approved $8,705,000.00 for the program.
The City is required to follow federal procurement guidelines, permitting and other
applicable regulations. The project is required to be completed within three (3) years.
The loan scheduled repayment is for 40 years at 2.625% interest. Annual payments,
which will begin after the completion of the loan – after construction – will be $352,032.
A debt service reserve fund is required to be established with monthly payments of $2,934
until $352,032 has accumulated. This will take approximately 10 years. An interim
financing loan from a local bank may be required to manage cash flow of the loan. The
City Engineer, City Attorney and City Bond Counsel are required to sign off on the terms
of the agreement with the USDA-RD. City Council is required to pass the resolution
before next steps can begin. City Council does not have to agree to the terms, in its sole
discretion it may reject the offer.
Staff recommends approval.)
12. Consideration of Bids for Coopers Mill Subdivision Sanitary Sewer Improvements Phase I:
(The Windsor Aughtry Company is the developer for the Cooper Mills subdivision being
constructed at the intersection of Mountain Road and Claremont Road. Cooper Mills is
designed for 175 single-family housing units. The City executed an agreement with the
Windsor Aughtry Company in 2021 to provide water and sewer service to the subdivision. An
annexation covenant has been executed and recorded as required by City Ordinance. On
June 30, 2022, the Windsor Aughtry Company purchased 175 water and sewer taps.
The agreement to provide water and sewer service allows the City Engineer Troy Rosier to
bid and recommend to City Council award of the water and/or sewer lines. Mr. Rosier
managed the bid process for the sewer system component of the subdivision. Mr. Rosier in his
memo dated August 30, 2022 recommends “that a contract be awarded to the low bidder,
HDH Construction Group LLC, for the amount of Four Hundred Seventy-Four Thousand
Thirty-Six & 00/100 Dollars, ($474,036.00).”
City staff concurs.
HDH Construction Group, LLC $ 474,036.00 (recommended)
L.W. Inc. $ 498,386.00
Tugaloo Pipeline, Inc. $ 624,941.80
Cedar Farms & Construction, Inc. $ 711,562.87
Payne, McGinn and Cummins, Inc. $ 904,391.00
Don Moorhead Construction, Inc. No Bid.
13. Consider change order to Sammy Butts Grading and Landscaping for additional services at
the Simpson Road fields.
(On May 17, 2022, City Council approved a bid from Sammy Butts Grading and Landscaping
for the clearing, grading, seeding and irrigation of the Simpson Road athletic fields. At the
request of City staff, Sammy Butts Grading and Landscaping provided an amended contract
to include additional items to enhance the outcome of the field construction.
Original Amended difference
Grading $28,000 $45,000 $17,000
Clearing $ 6,500 $ 0 ($ 6,500)
Grassing $10,500 $19,558 $ 9,058
Irrigation $14,000 $19,500 $ 5,500
Total $59,000 $84,058 $25,058
Staff recommends approval.)
14. Consider authorization for City stage use outside the City limits for Corinth Baptist Church at
1607 Toccoa Highway for an event on September 18 and 19, 2022.
(Westminster has a mobile stage and a policy governing its use. Corinth Baptist Church
submitted an application and required fees requesting the use of the stage. Only City Council
may authorize the use of the stage outside the city limits.)
15. Consider Appointment to the Oconee Joint Regional Sewer Authority Commission (OJRSA).
(Utilities Director Leigh Baker currently serves as one of the City’s two OJRSA
Appointee’s. With his departure from the City set for the end of September 2022, Council
is asked to consider another appointee.
The motion for the appointee:
I move to appoint (insert first and last name) to the Oconee Joint Regional Sewer
Authority Commission (OJRSA) for the City of Westminster with a start date to begin
as soon as (she/he) may be sworn-in.)
Routine Business
1. Approval of the August 9, 2022 Public Hearing Meeting Minutes
2. Approval of the August 9, 2022 Regular Meeting Minutes
3. Approval of the August 16, 2022 Called Meeting Minutes
4. Approval of the August 25, 2022 Called Meeting Minutes
5. Comments from the Utility Director
a. Update on installation of water pumps at raw water intake
b. Update on upgrades to the City’s electric system
c. Hall street water line update
d. Sidewalk repairs using C-Funds update
e. Other matters
6. Comments from City Administrator
a. Application to CDBG program through ACOG for Anderson Park Improvements.
b. Application to SCIIP and RIA for sewer infrastructure projects
c. Other matters
Executive Session
None
Adjourn
ORDINANCE NO. 2022-09-13-03
AN ORDINANCE AMENDING THE CITY OF WESTMINSTER’S
SCHEDULE OF FEES, REFERRED TO AS THE CLERKS RECORD, TO
INCORPORATE BAKFLOW TESTING FEES
WHEREAS, the City of Westminster, South Carolina (the “City”) is a legally constituted
municipal corporation incorporated by Act No. 744 of the Acts and Joint Resolutions of the
General Assembly of the State of South Carolina for the year 1875, and maintains a combined
utility system (the “System”), and
WHEREAS, the City maintains a schedule of fees, referred to as the Clerks Record , that
lists fees approved by the City Council; and
WHEREAS, the South Carolina Department of Health and Environmental Control
(SCDHEC) monitors the City’s sanitary sewer system, its operations and maintenance that
includes back flow installation and backflow testing; and
WHEREAS, the City desires to offer its sewer customers an optional service of backflow
testing at provided fees that are cost competitive.
NOW, THEREFORE, BEING DULY ASSEMBLED, BE IT ORDAINED BY THE
MAYOR AND THE CITY COUNCIL OF THE CITY OF WESTMINSTER, AS
FOLLOWS:
There is hereby adopted an official Clerks Record, as amended to include Backflow Tests
with fees, listing specific fees, business licenses, and utility rates charged by the City for:
a) the use of City facilities and equipment for the purposes of making them available to public
b) specific utility rates the proceeds of which are for the maintenance and expansion of its
water and sewer system
c) the reproduction of public records and other miscellaneous services to cover the actual cost
of producing these documents and information under the provision of SC §30-4-30(B)
d) Other various fees associated with enhanced direct services provided by the City.
The Clerk’s Record is incorporated and adopted by reference and placed on file in the Office of
the City Clerk.
DONE AND ORDAINED, this 13th day of September 2022.
CITY OF WESTMINSTER,
SOUTH CAROLINA
(SEAL)
By:_________________________________
Mayor Brian Ramey
Attest:
By:______________________
Rebecca Overton, City Clerk
First Reading: ___________________ 20__
Second Reading: ___________________ 20__
BOARD OF APPEALS HEARING $75
PLANNING COMMISSION HEARING $75
•Political sign application fees are 100% refundable when all signs are removed
•There are limits and restrictions to signage in our zoning ordinance.
Please call City Hall (647-3200) for more information
ZONING PERMIT FEES FLAT FEE
PLANNED UNIT DEVELOPMENT APPLICATION $200
RENEWAL BANNER FEE $150
Insurance is optional
POLITICAL SIGN APPLICATION $250
FOOTBALL EQUIPMENT DEPOSIT $20
INSURANCE $10
SPONSOR FEE $200
FOOTBALL SPONSOR FEE $300
NEW BANNER FEE $200
RESIDENTS OUTSIDE CITY LIMITS $60
LATE REGISTRATION FEE $10
RECREATION DEPARTMENT OTHER FEES FLAT FEE
•Family court paperwork consists of any documents pertaining to a specific case (disks, audio trapes, etc…)
RECREATION DEPARTMENT REGISTRATION FEES FLAT FEE
RESIDENTS INSIDE CITY LIMITS $35
POLICE FLAT FEE
ACCIDENT REPORTS $10
CIVIL CASE REPORTS $50-$100
FAMILY COURT PAPERWORK $10
FLAT FEESIGN PERMITS
SIGN PERMIT $50
*NEEDED FOR ANY AND ALL SIGNS WITHIN
CITY LIMITS
BANNER PERMIT $25
*NEEDED FOR ANY AND ALL BANNERS
WITHIN CITY LIMITS
3) 8 YRD DUMPSTERS 2X WEEK $856.68
3) 8 YRD DUMPSTERS 3X WEEK $1,476.88
8 YRD 2X WEEK $355.96
8 YRD 3X WEEK $463.93
2) 8 YRD DUMPSTERS 1X WEEK $303.84
2) 8 YRD DUMPSTERS 2X WEEK $683.82
2) 8 YRD DUMPSTERS 3X WEEK $891.64
2) 6 YRD DUMPSTERS 1X WEEK $297.44
2) 6 YRD DUMPSTERS 2X WEEK $507.60
2) 6 YRD DUMPSTERS 3X WEEK $612.70
8 YRD 1X MONTH $51.99
8 YRD 1X WEEK $181.91
4 YRD 3X WEEK $302.11
6 YRD 1X MONTH $45.64
6 YRD 1X WEEK $154.28
6 YRD 2X WEEK $302.45
6 YRD 3X WEEK $450.64
2 YRD 2X WEEK $118.05
2 YRD 3X WEEK $137.08
4 YRD 1X MONTH $39.30
4 YRD 1X WEEK $125.11
4 YRD 2X WEEK $213.61
DUMPSTERS MONTHLY FEE
EXTRA DUMP $26.25
2 YRD 1X MONTH $32.97
2 YRD 1X WEEK $99.04
$13.94 for each additional
GARBAGE/COM. ROLL CAN INSIDE CITY LIMITS $25.50
GARBAGE/RES ROLL CAN OUTSIDE CITY LIMITS $26.63
LOCK BAR FEE $5.25
SOLID WASTE
GARBAGE MONTHLY FEE
GARBAGE/RES ROLL CAN INSIDE CITY LIMITS $20.29 for first one
96 gallons roll cart; 1/2 cubic yard
•If the restrooms are locked, please call the Police department (647-3222)
•The city cannot guarantee the cleanliness of the restrooms
•You are responsible for garbage disposal
•If the grill is used, you must extinguish the charcoal
•If for any reason someone is at a shelter you reserved please call the Police department
•If you do not get an answer at the Police department, please call the Sheriff's office
(638-4111) and have them page a Westminster police officer to the park
The Pavilion at Anderson Park
PAVILION $35 for 3 hours
SMALL GAZEBO $25 for 3 hours
ADDITIONAL HOURS $5 per hour
•You will have access to power outlets, lights, and fans in the pavilion
PARK RENTALS FLAT FEE
Backflow Tests Price
3/4-1" Residential $ 150.00
2-4" $ 160.00
6-18" $ 200.00
Confined Space Entry $140 plus
SEWER
SW NON-RES 3" WM
SW INSIDE RESIDENTIAL
SW OUTSIDE RESIDENTIAL
SW NON-RES 6" WM
SW NON-RES 4" WM
SW NON-RES 2" WM
TN SW NON-RES 4"WM MAIN
COUNTY SEWER ONLY
4" SEWER TAP INSIDE
4" SEWER TAP OUTSIDE
6" SEWER TAP INSIDE/OUTSIDE
The sewer charge covers both collection and treatment of sewer
The Oconee Joint Regional Sewer Authority provides treatment services
Sewer billing is based on your water meter reading
$149.38 $5.03
$8.66 $6.36
$1,300
$138.34 $8.00
$39.64 $8.00
$21.54 $8.72
$25.10 $9.22
$192.41 $8.00
MONTHLY BASE FEE MONTHLY FEE
PER 1000 GAL
$88.99 $8.00
WATER LINE EXTENSION TBD
ROAD BORE $150
WATER - 2" METER $76.89 $5.60
3/4" WATER TAP INSIDE $1,700
1" WATER TAP INSIDE $1,900
3/4" WATER TAP OUTSIDE $1,900
WATER - 4" METER $372.62 $5.60
WI CITY 3/4" OR 1" METER (INSIDE) $12.70 $3.49
2. WO CITY 3/4" OR 1" METER (OUTSIDE) $24.71 $6.11
WATER-3" METER $224.76 $5.60
1. WATER - 6" METER $520.48 $5.84
WATER MONTHLY FLAT FEE MONTHLY FEE
BASE FEE PER 1000 GAL
YARD LIGHT175W $12.24
YARD LIGHT 400W $20.06
YARD LIGHT MAIN SERVICE $40.10
COM/DEM ELE NTX GOOD NEIGHBOR RATE $21.00 $0.16716
$.12537 after 3000 kw
COM DEMAND ELE TX $38.43 $0.05342
$.12537 after 3000 kw
COM/DEM ELE NTX STND $22.05 $0.17552
$.13164 after 3000 kw
DEMAND ELECTRIC TX STND $22.05 $0.17552
$.13164 after 3000 kw
DEMAND ELECTRIC TX GOOD NEIGHBOR RATE $21.00 $0.16716
$.14539 after 3000 kw
COM ELECTRIC TX GOOD NEIGHBOR RATE $21.00 $0.21653
$.13847 after 3000 kw
RE ELECTRIC STND $15.44 $0.15094
RE ELECTRIC GOOD NEIGHBOR RATE $14.70 $0.14375
COM ELECTRIC TX STND $22.05 $0.22736
UNDERGROUND POWER (EXISTING) TBD
UNDERGROUND POWER (NEW) TBD
TEMPORARY POWER POLE $125
ELECTRIC MONTHLY FLAT FEE MONTHLY FEE
BASE FEE PER KW
1" WATER TAP OUTSIDE $2,100
$1,500
COST + 30%
UTILITY DEPARTMENT
LATE PENALTY
DEPOSIT
SERVICE FEE
RETURN CHECK/DRAFT
NON PAYMENT FEE
DHEC
METER TAMPERING
the certified letter
services can be restored
DEPOT RENTAL $50 FOR FIRST HOUR -$25 FOR EVERY HOUR AFTER THAT (MIN. OF 4 HOURS)
SECURITY DEPOSIT $100
•Security deposit is 100% refundable when depot key is returned
500,000 GAL + $1,000
•All bulk water should be purchased at city hall and then picked up at the water plant at
735 Cornelia Avenue on any day between 7 AM and 3 PM
RENTALS
DEPOT FLAT FEE
50,001-100,000 GAL $200
100,001-500,000 GAL $500
•DHEC is a regulatory fee recouped from each active water customer
•Meter tampering results in a call to police and a penalty of $150-$500
WATER PLANT
BULK WATER FLAT FEE
SOLD AT THE WATER PLANT ONLY
0-5,000 GAL $20
5,000-25,000 GAL $50
25,001-50,000 GAL $100
•Late penalties are applied on the 15th of every month at 5 PM
•A deposit and a service fee is charged when utilities are connected
•Return check or draft fees must be paid in full within 10 days of the date of
•Reconnect fees must be paid in full PLUS all past due balances before
UTILITIES
FEE
$5 OR 5% OF BILL(whichever is greater)
$0-$250
$25
$30.00
$50 applied at 8 AM on cutoff day
$0.35/MONTHLY
$150-$500
ORDINANCE NO. 2022-09-13-05
AN ORDINANCE AMENDING THE CITY OF WESTMINSTER’S
BUDGET ORDINANCE, AN ORDINANCE MAKING APPROPRIATIONS
FOR CERTAIN EXPENSES, CAPITAL IMPROVEMENTS AND
INDEBTEDNESS OF THE CITY OF WESTMINSTER, SOUTH
CAROLINA FOR THE FISCAL YEAR BEGINNING JULY 1, 2022 AND
ENDING JUNE 30, 2023
WHEREAS, the City of Westminster, South Carolina (the “City”) is a legally constituted
municipal corporation incorporated by Act No. 744 of the Acts and Joint Resolutions of the
General Assembly of the State of South Carolina for the year 1875); and
WHEREAS, the City adopted Ordi nance #2022-06-14-01, its Budget Ordinance for the
year beginning July 1, 2022 and ending June 30, 2022; and
WHEREAS, the City desires to provide for salary increases in the Fire Department Budget;
and
WHEREAS, the City Council desires to amend the Budget Ordinance to account to move
$94,000 from the Police Department Salary Line item to the Fire Department Line item; and
NOW, THEREFORE, BEING DULY ASSEMBLED, BE IT ORDAINED BY THE
MAYOR AND THE CITY COUNCIL OF THE CITY OF WESTMINSTER, AS
FOLLOWS:
The Annual Budget is hereby amended and adopted:
Original Amended Difference
General Fund, Police Dept, Personnel Services, Salaries $322,895 $297,895 ($25,000)
General Fund, Fire Dept, Personnel Services, Salaries $190,314 $215,314 $25,000
DONE AND ORDAINED, this 13th day of September 2022.
CITY OF WESTMINSTER,
SOUTH CAROLINA
(SEAL)
By:_________________________________
Mayor Brian Ramey
Attest:
By:______________________ ____________________________________
Rebecca Overton, City Clerk Andrew Holliday, City Attorney
First Reading: ___________________ 20__
Second Reading: ___________________ 20__
1
AGREEMENT FOR THE TRANSFER OF WATER LINE
BY AND BETWEEN
PIONEER RURAL WATER DISTRICT OF OCONEE AND ANDERSON COUNTIES
AND
CITY OF WESTMINSTER
This AGREEMENT FOR THE TRANSFER OF WATER LINE (this “Agreement”) is
entered into this __ day of June, 2022, by and between Pioneer Rural Water District of Oconee
and Anderson Counties, a body politic and corporate and a special purpose district organized
under the laws of the State of South Carolina (“Buyer”), and City of Westminster, Westminster,
South Carolina, a body politic and corporate and a political subdivision of the State of South
Carolina (“Seller”). Each entity is a “Party” and together they are the “Parties.”
WHEREAS, Seller operates a water collection and transportation system that serves certain
customers in Westminster, South Carolina;
WHEREAS, the Parties have agreed on terms for Buyer to purchase Seller’s water line
running 3.7 miles from the intersection of Hwy 24 and S. Hampton St. (34.64830 – 83.07407) to
the intersection of Fire Tower Rd. and Hwy 24. (34.61092 – 83.03943) in Westminster, South
Carolina (the “Sale”), which include without limitation the transfer of the Seller’s Line and associated
easements to Buyer and the transfer of certain infrastructure more particularly set forth herein; and
other matters set forth below;
NOW, THEREFORE, in consideration of the premises and mutual covenants and
obligations contained herein the receipt and sufficiency of which the parties hereby acknowledge,
Buyer and Seller do hereby agree as follows:
ARTICLE I
DEFINITIONS AND RULES OF CONSTRUCTION
SECTION 1.1. Definitions. The terms defined below are used in this Agreement with
meanings ascribed thereto unless a different meaning is plainly intended.
“Agreement” means this Agreement for the Transfer of Water Line dated September
____,2022 by and between Seller and Buyer.
“Environmental Laws” means any federal, state, local, or foreign law (including, without
limitation, common law), treaty, judicial decision, regulation, rule, judgment, order, decree,
injunction, permit, or governmental restriction or any agreement with any governmental body or
other third party, whether now or hereafter in effect, relating to the environment, human health
and safety, or to pollutants, contaminants, wastes, or chemicals or any toxic, radioactive, ignitable,
corrosive, reactive, or otherwise hazardous substances, wastes, or materials.
2
“Seller’s Line” means the assets comprising the Seller ’s water line, as further defined in
SCHEDULE 1.1.
“Transfer Date” means that date for the transfer of ownership of the Seller’s Line from
Seller to Buyer.
ARTICLE II
AGREEMENT TO TRANSFER WATER LINE
SECTION 2.1. Agreement to Transfer. Upon the terms and subject to the conditions set
forth in this Agreement, on the Transfer Date, Seller shall sell, transfer, assign, convey, and
deliver to Buyer, and Buyer shall purchase and acquire from Seller, all of the assets compromising
Seller’s Line.
SECTION 2.2. Conditions to Closing.
(a) To Seller. The following shall be conditions precedent to the obligation of Seller to
proceed with the closing of the Sale (the “Closing”). Each condition may be waived in whole or part
only by written notice of such waiver from Seller to Buyer.
i. Approval of the Sale by all applicable governmental authorities;
ii. Reserved;
iii. Buyer shall have performed and complied in all material respects with all of the
terms of this Agreement to be performed and complied with by Buyer prior to or
at the Closing; and
iv. On the Transfer Date, all representations and warranties of Buyer set forth in this
Agreement shall be true, accurate and complete.
(b) To Buyer. The following shall be conditions precedent to the obligation of Buyer to
proceed with the Closing. Each condition may be waived in whole or part only by written notice
of such waiver from Buyer to Seller.
i. Approval of the Sale by all applicable governmental authorities;
ii. Reserved;
iii. Seller shall have performed and complied in a ll material respects with all of the
terms of this Agreement to be performed and complied with by Seller prior to or
at the Closing; and
iv. On the Transfer Date, all representations and warranties of Seller set forth in this
Agreement shall be true, accurate and complete.
If the Closing shall fail to occur as the result of the failure of any condition precedent,
each Party shall be responsible for its own costs.
3
(c) Due Diligence Period. Buyer shall have a period, commencing on the date of this
Agreement through the date which is sixty (60) days after the date of this Agreement (the “Due
Diligence Period”), to conduct or cause to be conducted any and all tests, studies, surveys,
inspections, reviews, assessments, or evaluations of the Seller’s Line (the “Inspections”), as Buyer
deems necessary, desirable, or appropriate in its sole and absolute discretion. Buyer shall have the
unconditional right, for any reason or no reason whatsoever, to terminate this Agreement upon
written notice to Seller delivered at any time prior to 11:59 p.m. EST on the last day of the Due
Diligence Period. If Buyer does not timely notify Seller of its election to terminate this Agreement
prior to 11:59 p.m. EST on the last day of the Due Diligence Period, Buyer shall be deemed to
have elected to proceed to Closing, subject to the terms and conditions of this Agreement. If Buyer
elects to terminate this Agreement as provided in this Section, this Agreement shall terminate,
and the parties shall have no further liability hereunder (except with respect to those obligations
hereunder which expressly survive the termination of this Agreement). Notwithstanding anything
to the contrary contained in this Agreement, amendments to this Agreement to extend the Due
Diligence Period may be agreed in writing or email by each party or each Party's respective
attorney and notices to terminate this Agreement prior to the expiration of the Due Diligence
Period may be given, by Buyer as provided in this Agreement or by Buyer or Buyer's attorney by
fax or by email to Seller and/or Seller's attorney.
SECTION 2.3. Transfer Date
Buyer shall establish a Transfer Date and communicate the same to Seller in writing,
which date shall be not more than thirty (30) days following the expiration of the Due Diligence
Period and the satisfaction of the conditions to Closing.
SECTION 2.4. Assets Transferred to Buyer.
Seller shall transfer and Buyer accepts all the assets of the Seller’s Line as of the Transfer
Date. The following provisions enumerate the assets constituting the Seller’s Line:
(a) Fixed Assets, Easements and Rights -of-Way. Seller transfers to Buyer:
i. Fixed Assets. All pipes, valves, lines, meters, pressure regulatory devices , wells, tanks,
pumps, fire hydrants, disinfectant units, and other property, plant, and fixed equipment
used in the provision of water service or used in operating the Seller’s Line.
Notwithstanding the foregoing, the master meter located on the line at the intersection of
Hwy 24 and S. Hampton St. (34.64830 – 83.07407) and the water tank on Fire Tower Rd.
shall remain the property of the Seller. A bill of sale of all the fixed assets transferred to
Buyer is attached as EXHIBIT A.
ii. Res erved.
iii. Easements and Rights -of-Way. Rights-of-way, easements of record and
prescriptive easements, if any, used in the provision of water service or in
operating the Seller’s Line. An assignment of such easements and rights -of-way
and non-exclusive lists of specifically enumerated easements and rights-of-way, is
attached as EXHIBIT B.
4
(b) Non-Enumerated Real Property and other Interests. The Parties recognize and
acknowledge that the list of rights-of-way, easements, and other interests in real property associated
with the Seller’s Line that is contained in the exhibits to this Agreement may not be exhaustive and that
certain interests in real property associated with the Seller’s Line and intended to be transferred
hereunder may not be specifically enumerated therein. It is the express intention of the Parties to transfer
to Buyer all Seller’s rights-of-way, easements, and other interests in real property, including prescriptive
rights, that are associated with the Seller’s Line whether they are listed in the exhibits to this Agreement
or not. Seller agrees to use its best efforts to maintain those records and documents in its possession that
are related to rights-of-way, easements, and other interests in real property associated with the Seller’s
Line and will locate such documents and provide them to Buyer upon reasonable request. Seller agrees
to execute any documents necessary or convenient to perfect the transfer or recording of the transfer of
any such non-enumerated interests in real property to Buyer upon reasonable request of Buyer.
(c) C ontracts, Permits, Records, Reports. Seller transfers to Buyer all existing or
outstanding contracts, permits, permit files, drawings, engineering reports and other documents
related to the Seller’s Line as well as any warranty rights or claims against third parties related to the
Seller’s Line. The documents transferred include, without limitation, operating permits, regulatory
and compliance reports, studies, maintenance records, reports and evaluations, engineering studies,
and information related to capital improvement projects, insurance claims and other liabilities.
(d) Closing Costs. Buyer shall pay all recording fees and other costs associated with
the recording of the real property interests granted herein.
(e) Other Liabilities; Indebtedness. Buyer does not assume responsibility for any other
liabilities, loans or indebtedness of Seller or the Seller’s Line.
SECTION 2.5. Purchase Price The purchase price due and payable on the day of Closing
from Buyer to Seller shall be Seventy One thousand and Five Hundred Dollars and 00/100 Dollars
and 00/100 ($71,500).
SECTION 2.6. Liens. Seller shall transfer to Buyer title to Seller’s Line free and clear of
all liens recorded as a matter of public record as of the Transfer Date.
SECTION 2.7. Loss or Damage to the Seller’s Line. If before the Transfer Date, the assets
comprising the Seller’s Line suffer loss or damage then all insurance proceeds related to the loss or
damage shall be expended as directed by Buyer to repair the Seller’s Line and the balance paid to
Buyer at the Transfer Date.
SECTION 2.8. Capacity and Repairs. After Closing, Buyer will operate and maintain the
Seller’s Line according to its ordinary standards and practices, using sound engineering and
operating practices.
5
ARTICLE III
REPRESENTATIONS AND WARRANTIES
SECTION 3.1. Representations and Warranties of Seller . Seller hereby represents and
warrants to Buyer as follows:
(a) Due Authorization, Execution, and Delivery. Seller has full right, power, and authority
(i) to enter into this Agreement, (ii) to transfer the Seller’s Line to Buyer and convey the easements
and other property as contemplated herein, and (iii) to perform all its obligations hereunder. Seller
has taken all action necessary to authorize the execution and delivery of this Agreement and all other
documents, instruments, or agreements necessary to effectuate the intent hereof. No further action,
consent, or approval is required by Seller or by any governmental body to approve, consent to, or
permit the performance by Seller of its obligations hereunder or transfer the real property interests as
contemplated hereby.
(b) N o Conflict, Breach, or Default. The execution and delivery of this Agreement and
the performance by Seller of its obligations hereunder will not conflict with or constitute a breach
of or default under (i) any contract or agreement to which Seller a is a party or by which Seller is
bound or to which its assets are subject, (ii) any law, regulation, administrative or judicial order, or
any judgment or decree to which Seller or the Seller’s Line is subject, or (iii) any act of Seller or
any resolutions or ordinance of Seller.
(c) L
itigation. There is no litigation, arbitration, or other legal or administrative suit,
action, proceeding, or investigation pending or threatened against or involving Seller or the
ownership or operation of the Seller’s Line, including, but not limited to, any condemnation action
relating to the Seller’s Line.
(d) T itle to Seller’s Line . Seller has good, marketable and insurable legal title to all of
the assets of the Seller’s Line to be transferred hereunder, free and clear of all liens, claims and
encumbrances.
(e) C ontracts. Seller is not a party to any contracts related to the Seller’s Line except
for the contracts listed on EXHIBIT C attached hereto (the “Contracts”). Seller has performed
all of its obligations under each of the Contracts and no fact or circumstance has occurred which,
by itself or with the passage of time or the giving of notice or both, would constitute a default by
any party under any of the Contracts. Seller has delivered to Buyer true, correct, and complete
copies of all Contracts.
(f) V
iolations. Seller has not received notice of any material violation of any law or
municipal ordinance, order, or requirement noted or issued against the Seller’s Line by any
governmental authority having jurisdiction over the Seller’s Line, that has not been cured, corrected,
or waived as of the date hereof.
6
(g) Hazardous Materials. Seller has not placed any, and to Seller's knowledge, there are
no Hazardous Materials installed, stored in, or otherwise existing at, on, in, or under the real property
or Seller’s Line in violation of any Environmental Laws. “Hazardous Materials” means “Hazardous
Material,” “Hazardous Substance,” “Pollutant or Contaminant,” and “Petroleum” and “Natural Gas
Liquids,” as those terms are defined or used in CERCLA, and any other substances regulated
because of their effect or potential effect on public health and the environment, including PCBs,
lead paint, asbestos, urea formaldehyde, radioactive materials, putrescible materials, and infectious
materials.
(h) C
ontinued Maintenance. Seller will maintain the Seller’s Line pending transfer to
Buyer according to its ordinary standards and practices, using sound engineering and operating
practices, and in a safe, sanitary and environmentally sound manner, and take all actions
necessary to prevent any undue degradation or damage to the assets comprising the Seller’s Line.
(i) Continued Insurance. Seller will maintain property and casualty insurance on the
entire Seller’s Line in an amount equal to the reasonable replacement value of the Seller’s Line
pending transfer of the Seller’s Line to Buyer and will cause Buyer to be listed as an additional
insured on such policy.
SECTION 3.2. Representations and Warranties of Buyer. Buyer hereby represents and
warrants to Seller as follows:
(a) Due Authorization, Execution, and Delivery. Buyer has full right, power, and
authority (i) to enter into this Agreement, (ii) to acquire and operate the Seller’s Line, and (iii) to
perform all its obligations hereunder. Buyer has taken all action necessary to authorize the execution
and delivery of this Agreement and all other documents, instruments, or agreements necessary to
effectuate the intent hereof. No further action, consent, or approval is required by Buyer or by any
governmental body to approve, consent to, or permit the performance by Buyer of its obligations
hereunder or to acquire and operate the Seller’s Line as contemplated hereby.
(b) N
o Conflict, Breach, or Default. The execution and delivery of this Agreement and
the performance by Buyer of its obligations hereunder will not conflict with or constitute a breach
of or default under (i) any contract or agreement to which Buyer is a party or by which Buyer is
bound or to which the assets of the Seller’s Line are subject, (ii) any law, regulation, administrative
or judicial order, or any judgment or decree to which Buyer or the Seller’s Line is subject, or (iii)
any act of Buyer or any resolutions or the bylaws of Buyer.
SECTION 3.3. Default. In the event either Party discovers that any representation is
untrue in any material respect or any warranty is breached in any material respect, the cost of
correcting any problem resulting therefrom or of paying or responding to any resulting claims,
including reasonable attorney's fees, shall be borne by the Party whose representation is untrue or
whose warranty is breached. In the event either Party fails to timely perform its obligation s
hereunder, the other Party may initiate action to compel compliance in any court of competent
jurisdiction. The costs of such action shall be recoverable from the defaulting Party.
7
ARTICLE IV
MISCELLANEOUS
SECTION 4.1. Counterparts. This Agreement may b e executed in counterparts, which
when assembled shall constitute but one original Agreement.
SECTION 4.2. Severability. The provisions hereof are severable and in the event any one
or more of such provisions is void or unenforceable, the remainder of this Agreement shall
constitute the agreement between the Parties as to the subject matter hereof.
SECTION 4.3. Effect of Dissolution of a Party . In the event either Buyer or Seller for
any reason shall be dissolved, consolidated or its legal existence shall otherwise be terminated,
all of the covenants, stipulations, obligations, and agreements contained in this Agreement by or
on behalf of or for the benefit of such Party shall bind or inure to the benefit of the successor or
successors thereof.
SECTION 4.4. Legal Holidays. In any case where the date of any action required
hereunder shall be on a day which is a legal holiday in the State of South Carolina, performance
shall be deemed timely if made on the next succeeding day that is not such a legal holiday with
the same force and effect as if such act were performed on the date otherwise provided for herein.
SECTION 4.5. Manner of Giving Notice. All notices, demands, and requests to be given
to or made hereunder by Buyer or Seller shall be given or made as indicated below or in writing
and shall be deemed to be properly given or made if sent by United States certified mail, return
receipt requested, postage prepaid, addressed as follows:
(a) As to Seller:
City of Westminster
ATTN: Kevin Bronson
100 E. Windsor St.
Westminster, SC 29676
(b) As to Buyer:
Pioneer Rural Water District
5500 West-Oak Hwy.
Westminster, SC 29693
Attention: Terry Pruitt
Copy to:
Nelson Mullins Riley & Scarborough LLP
2 W. Washington Street, Suite 400
8
Greenville, SC 29601
Attention: Rivers Stilwell
Any such notice, demand, or request may also be transmitted to the appropriate above-mentioned Party
by email (to Seller at [kbronson@westminstersc.org] or to Buyer at tpruitt@pioneerwater.net with a
copy to rivers.stilwell@nelsonmullins.com) and shall be deemed to be properly given or made when
sent.
Any of such addresses may be changed at any time upon written notice of such change sent by
United States certified mail, return receipt requested, postage prepaid, or email to the other Party by the
Party effecting the change.
SECTION 4.6. Parties Alone H ave Rights under Agreement. There are no third- party
beneficiaries to this Agreement. Except as herein otherwise expressly provided, nothing in this
Agreement, express or implied, is intended or shall be construed to confer upon any person, firm, or
corporation, other than Buyer and Seller any right, remedy or claim, legal or equitable, under or by
reason of this Agreement or any provision hereof. This Agreement and each provision herein are
intended to be and are for the sole and exclusive benefit of Buyer and Seller.
SECTION 4.7. Headings. Any heading preceding the text of the several articles hereof,
and any table of contents or marginal notes appended to copies hereof, shall be solely for
convenience of reference and shall not constitute a part of this Agreement, nor shall they affect
its meaning, construction, or effect.
SECTION 4.8. Choice of Forum. The Parties hereto agree that any suit, action, or
proceeding seeking to enforce any provision of, or based on any matter arising out of or in
connection with, this Agreement of the transactions described herein may be brought only in the
Court of Common Pleas for Oconee County, South Carolina, or in the original jurisdiction of the
South Carolina Supreme Court.
SECTION 4.9. Rules of Construction. Words of masculine gender shall be deemed and
construed to include correlative words of feminine and neuter genders and, unless the context shall
otherwise indicate, words in singular shall also be plural and vice versa. I n the event any one or
more provisions hereof are determined to be void, invalid, or unenforceable, so long as the
remainder of this Agreement is sufficient to accomplish its primary purpose, such void, invalid, or
unenforceable provision shall be severed herefrom and the balance hereof shall constitute the
agreement of the Parties hereto. Certain representations, warranties, rate matters, easement filings,
and covenants are not verifiable or to be performed until after the Transfer Date; therefore the
provisions hereof shall survive the Transfer Date and the transfers contemplated.
SECTION 4.10. Survival. Terms, covenants, and agreements contained herein shall
survive the Closing of the transfer of the Seller’s Line as appropriate to carry into effect the intent
of the Parties as manifested in those terms.
[REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]
9
IN WITNESS WHEREOF, Buyer and Seller have caused this Agreement for the
Transfer of Assets to be signed in their names by their duly authorized officers as of the date first
hereinabove written.
SELLER:
City of Westminster, Westminster, South
Carolina
By:_______________________________
Name: ____________________________
Its: _______________________________
BUYER:
Pioneer Rural Water District of Oconee and
Anderson Counties
By:________________________________
Name: _____________________________
Its: ________________________________
LIST OF EXHIBITS AND SCHEDULES
EXHIBIT A – Bill of Sale for Water System and Fixed Assets
EXHIBIT B – Form of Assignment of Easements and Rights-of-Way
EXHIBIT C – Contractual Obligations
SCHEDULE 1.1 – Seller’s Line
10
EXHIBIT A
STATE OF SOUTH CAROLINA )
COUNTY OF OCONEE )
BILL OF SALE FOR WATER LINE
FOR AND IN CONSIDERATION of the sum of Seventy One Thousand and Five Hundred
Dollars and 00/100 ($71,500) paid to City of Westminster, Westminster, South Carolina, a
body politic and corporate organized under the laws of the State of South Carolina (“Seller”), the
receipt and sufficiency of which is hereby acknowledged, at and before signing and sealing of
these presents, and the additional consideration hereinafter set forth, Seller does hereby sell,
transfer and convey to Pioneer Rural Water District of Oconee and Anderson Counties, a body
politic and corporate and a political subdivision of the State of South Carolina (“Buyer”), its
successors and assigns forever, any rights, title and interest as it may have in all assets and
equipment associated with the Seller’s Line , including but not limited to all pipes, valves, lines,
meters, pressure regulatory devices, wells, tanks, pumps, fire hydrants, disinfectant units, and other
property, plant, and fixed equipment used in the provision of water service or in operating the
water collection and transportation facilities, as applicable, if any (collectively, the “Seller’s Line
Assets”). Buyer shall make available to the Seller, at least annually, all fire hydrant flow reports
for hydrants located along Seller’s Line for Seller’s Fire Department ISO reporting.
TO HAVE AND TO HOLD the Seller’ s Line Assets unto Buyer, and Buyer’s successors
and assigns forever, and Seller does hereby bind Seller, and Seller’s successors and assigns, to
WARRANT and FOREVER DEFEND, all and singular the Seller’s Line Assets unto Buyer, and
Buyer’s successors and a ssigns, against every person whomsoever lawfully claiming or to claim
the same, or any part thereof by, through and under Seller but not otherwise.
The Parties agree to take all such further actions and execute, acknowledge and deliver all
such further documents that are reasonably necessary or useful in carrying out the purposes of this
Bill of Sale.
It is agreed that this Bill of Sale For Water Line and the related AGREEMENT FOR THE
TRANSFER OF WATER LINE BY AND BETWEEN PIONEER RURAL WATER DISTRICT
OF OCONEE AND ANDERSON COUNTIES AND COMMISSION OF PUBLIC WORKS,
CITY OF WESTMINSTER (including all Exhibits, amendments, supplements and corrections
thereto signed by both Parties, the “Transfer Agreement”) and the associated documents referenced
therein, comprise all the agreements between the Parties and no representations or statements,
verbal or written, have been made, modifying, adding to, or chang ing the terms of these
agreements. Capitalized terms used herein and not otherwise defined shall have the meanings
given in the Transfer Agreement.
[signature on following page]
11
IN WITNESS WHEREOF, the Seller hereunto has set its Hand and Seal on this
____ day of __________________ , 2022.
SIGNED, SEALED AND
DELIVERED IN THE PRESENCE OF:
Witnesses: SELLER:
City of Westminster, Westminster, South
Carolina
_______________________________ By:__________________________(SEAL)
Witness No. 1 Name: _______________________
Its: __________________________
_______________________________
Witness No. 2
12
EXHIBIT B
ASSIGNMENT OF EASEMENTS AND RIGHTS-OF-WAY
ASSIGNMENT AND ASSUMPTION OF EASEMENTS AND RIGHTS OF WAY
THIS ASSIGNMENT AND ASSUMPTION OF EASEMENTS AND RIGHTS OF
WAY (the “Assignment”) is made as of this __ day of ____, 2022 (the “Effective Date”), by and
between City of Westminster, Westminster, South Carolina, a body politic and corporate and a
special purpose district organized under the laws of the State of South Carolina (“Assignor”), and
Pioneer Rural Water District of Oconee and Anderson Counties , a body politic and corporate
and a political subdivision of the State of South Carolina (“Assignee”).
For Value Received, the receipt and sufficiency of which is hereby acknowledged,
Assignor hereby irrevocably and unconditionally assigns, conveys, transfers and sets over unto
Assignee all of Assignor’s rights, title and interest in and to all rights-of-way, permits, easements
of record and prescriptive easements, if any, used in the provision of water service or in operating
the Seller’s Line , including without limitation the easements, rights of way, crossing permits,
encroachment permits and similar rights more particularly described on Exhibit “A” attached
hereto and incorporated herein by reference (collectively, the “Easements”), and Assignee does
hereby accept and assume all of Assignor’s rights and obligations under the Easements that arise
or accrue after the Effective Date, subject to the terms and provisions of the Easements. The
parties to this Assignment agree to cooperate with one another in executing any a dditional
documents or agreements reasonably necessary to carry out the intent of this Assignment.
This Assignment may be executed in one or more counterparts, each of which shall be
deemed an original and all of which together shall constitute one and the same instrument. This
Assignment shall be governed by and construed in accordance with the laws of the State of South
Carolina. This Assignment shall be binding upon and inure to the benefit of the parties hereto, and
their respective successors and assigns. This Assignment may only be amended by an instrument
in writing executed by the parties hereto.
It is agreed that this Assignment and the related AGREEMENT FOR THE TRANSFER
OF WATER LINE BY AND BETWEEN PIONEER RURAL WATER DISTRICT OF OCONEE
AND ANDERSON COUNTIES AND COMMISSION OF PUBLIC WORKS, CITY OF
WESTMINSTER (including all Exhibits, amendments, supplements and corrections thereto
signed by both Parties, the “Transfer Agreement”) and the associated documents referenced
therein, comprise all the agreements between the Parties and no representations or statements,
verbal or written, have been made, modifying, adding to, or changing the terms of these
agreements. Capitalized terms used herein and not otherwise defined shall have the meanings
given in the Transfer Agreement.
[SIGNATURE PAGE ATTACHED]
13
Executed under seal as of the day and year first written above.
Witnesses: ASSIGNOR:
City of Westminster, Westminster, South
Carolina
_______________________________ By: _____________________________(SEAL)
Witness No. 1 Name: _____________________________
Title: ______________________________
_______________________________
Witness No. 2
ASSIGNEE:
Pioneer Rural Water District of Oconee and
Anderson Counties
_______________________________ By: ____________________________(SEAL)
Witness No. 1 Name: ____________________________
Title: _____________________________
_______________________________
Witness No. 2
14
STATE OF SOUTH CAROLINA )
) ACKNOWLEDGMENT
COUNTY OF OCONEE )
I, _________________________, a Notary Public in and for the County and State
aforesaid, certify that _____________, the duly authorized __________ of City of Westminster,
Westminster, South Carolina , as Assignor, personally appeared before me this day and
acknowledged the execution of the foregoing instrument on its behalf.
WITNESS my hand and official stamp or seal this ____ day of _______________, 2022
_________________________________
Notary Public for South Carolina
Print Name: _______________________
My Commission Expires: ____________
STATE OF SOUTH CAROLINA )
) ACKNOWLEDGMENT
COUNTY OF OCONEE )
I, _____________________________, a Notary Public in and for the County and State
aforesaid, certify that ______________, the duly authorized ___________ of Pioneer Rural
Water District of Oconee and Anderson Counties, as Assignee, personally appeared before me
this day and acknowledged that he executed the foregoing instrument.
WITNESS my hand and official stamp or seal this ____ day of _______________, 2022.
_________________________________
Notary Public for South Carolina
Print Name: _______________________
My Commission Expires: ____________
15
EXHIBIT “A”
All right, title and interest of Assignor under that certain _________________ dated _________,
between ________________, as ____________ and _______________, as ___________,
recorded on __________________ in the Office of the Register of Deeds for Oconee County in
Deed Book ____ at Page ____.
[To Follow]
16
EXHIBIT C
CONTRACTUAL OBLIGATIONS
17
The following is a list of all contractual obligations being assumed by Pioneer Rural Water
District of Oconee and Anderson Counties:
SCHEDULE 1.1
SELLER’S Line
18
The water line running 3.7 miles from the intersection of Hwy 24 and S. Hampton St. (34.64830
– 83.07407) to the intersection of Fire Tower Rd. and Hwy 24. (34.61092 – 83.03943) in
Westminster, South Carolina. Less and excepting the master meter located at the intersection of
Hwy 24 and S. Hampton St. (34.64830 – 83.07407) and the water tank and associated fixtures
located on Fire Tower Rd.
1
STATE OF SOUTH CAROLINA )
)
COUNTY OF OCONEE ) ORDINANCE #2022-10-11-01
)
CITY OF WESTMINSTER )
AN ORDINANCE AUTHORIZING AND ESTABLISHING AN ECONOMIC
DEVELOPMENT INCENTIVE PROGRAM TO ENCOURAGE PRIVATE
INVESTMENT IN THE INCENTIVE AREA OF THE CITY OF
WESTMINSTER, SOUTH CAROLINA; AUTHORIZING AND
ESTABLISHING A PROGRAM TO GRANT SPECIAL PROPERTY TAX
ASSESSMENTS TO CERTAIN REHABILITATED HISTORIC
PROPERTIES; AND OTHER MATTERS RELATED THERETO.
The City Council of the City of Westminster (the “Council”), the governing body of the
City of Westminster, South Carolina, has made the following findings of fact:
(A) Generally
(1) The City is a municipal corporation created under the laws of the State of South
Carolina.
(2) The Council has, through the approval of its Comprehensive Plan, established as a
matter of policy that economic growth is needed to help create job opportunities, provide a variety
of goods and services, and be the foundation for a tax base that can sustain a community through
business cycles.
(3) The City believes that it can better accomplish the goals of its Comprehensive Plan
by implementing programs to encourage investment within the City.
(B) Economic Development Incentive Program
(1) The City is duly empowered to enact ordinances, not inconsistent with the laws or
Constitution of the State of South Carolina, 1895, as amended, exercising its powers related to the
expenditure of public funds for public purposes and those other powers incident to, and necessary
for the accomplishment of, the City’s express authorization to levy certain taxes and fees.
(2) It is essential to the City’s efforts to foster revitalization and redevelopment within
the Incentive Area (as defined in Sec. 38.03 below) that the City offer certain Incentives (as defined
in Sec. 38.03 below) that will encourage private investment in the Incentive Area. The goals of the
City in offering the Incentives are as follows:
(a) to promote the construction of new buildings or the rehabilitation of existing
buildings within the Incentive Area; and
(b) to support the establishment of the categories of new businesses that the
2
Council determines will (i) significantly increase the overall commercial activity within
the Incentive Area, (ii) attract the City’s residents and tourists into the Incentive Area, and
(iii) increase property values within the City as a whole.
(3) While the Incentives may benefit the Incentive Recipients (as defined in Sec. 38.03
below), the primary beneficiary of the Incentives will be the City and its citizens who shall realize
the Benefits (as defined in Sec. 38.03 below).
(4) The Incentives, as provided for in an Incentive Agreement (as defined in Sec.
38.04(b) below), shall be s tructured in such a way that the value of the Benefits to the City will
exceed their value to the Incentive Recipients.
(5) The financial benefit of the Incentives to the Incentive Recipients will only be
realized at such time as certain Benchmarks ( as defined in Sec. 38.07(c)(i) below) are met or
continue to be met. Should all the Benchmarks be accomplished, the City believes that there is a
high probability that the Benefits will be realized by the City and that the value of the Benefits will
exceed the value of public funds expended on the Incentives.
(C) The Bailey Bill
(1) The City is authorized pursuant to Sections 5 -21-140 and 4-9-195 of the Code of
Laws of South Carolina 1976, as amended (collectively, the “ Bailey Bill”), to grant special
property tax assessments to real property that qualifies as a “rehabilitated historic property.”
(2) The Bailey Bill provides for certain procedures that the City and the owner of
qualifying historic property must follow in order to receive the benefits of the Bailey Bill.
(3) In furtherance of the City’s policies regarding its historic resources, the Council has
determined that the development and establishment of the Bailey Bill will achieve the following
goals:
(a) encourage the restoration of historic properties;
(b) promote community development and redevelopment;
(c) encourage sound community planning; and
(d) promote the general health, safety and welfare of the City.
(4) The Council hereby finds that the value of the benefits that will accrue to the
citizens of the City due to the achievement of the se goals will exceed the value of the special
property tax assessments to those who receive them.
(5) The Council further finds that the provisions of the Bailey Bill that permit the
rescission of the special property tax assessments in certain instances ensures that the benefits will,
in fact, accrue to the citizens of the City.
3
NOW, THEREFORE, BEING DULY ASSEMBLED, BE IT ORDAINED BY THE
CITY COUNCIL OF THE CITY OF WESTMINSTER THAT:
Section 1. Economic Development Incentive Program
(a) There is hereby enacted by the City, for the purposes discussed above, the
“Economic Development Incentive Program.” Amendments, modifications , and clarifications to
the Economic Development Incentive Program or succeeding amendments, modifications , or
clarifications to the Economic Development Incentive Program shall become effective if approved
and enacted by the City. Prior to such effective d ate, the version of the Economic Development
Incentive Program enacted by the terms hereof shall remain in full force and effect.
(b) The Economic Development Incentive Program shall be codified into the City’s
Code of Ordinances. By and through the enactment of this ordinance, Chapter 38, entitled
“ECONOMIC DEVELOPMENT INCENTIVE PROGRAM” shall be added to Title III
“ADMINISTRATION” of the City’s Code of Ordinances. Title III “ADMINISTRATION,”
Chapter 38 “ECONOMIC DEVELOPMENT INCENTIVE PROGRAM” shall be added to the
City’s Code of Ordinances as follows:
Sec. 38.01 - Title.
This Ordinance shall be titled “Economic Development Incentive Program.”
Sec. 38.02 - Authority.
Subject to the realization of certain Benefits (as defined in Sec. 38.03 below), the
Economic Development Incentive Program is enacted by the Council to meet its Goals (as
defined in Sec. 38.03 below).
Sec. 38.03 - Definitions.
As used in this Chapter 38, unless the context shall otherwise require, the following
terms shall have the following respective meanings:
“Benefits” means the value to the City of providing the Incentives, which generally
includes: (a) increased property values within the Incentive Area and the City as a whole;
(b) increased revenue from property taxes, business license fees and permit fees; (c)
increased tourism and commercial activity within the Incentive Area and the City as a
whole; and (d) the improvement of the character of the City by preserving existing
buildings within the Incentive Area and promoting the construction of new buildings that
are compatible with its City’s character.
“Incentive Area” shall mean the area encompassed by the C ity limits shown and
described in Ex hibit A in which the Council has determined that the revitalization and
redevelopment thereof is essential to preserving and improving the economy, society, and
4
culture of the City and enhancing the quality of life of the citizens thereof.
“Development” shall mean the activity of improving a real property to the extent
of adding value to the tax base through real property improvements, and the creation of
employment opportunities.
“Goals” means the objectives of the City in offering the Incentives, which generally
includes: (a) promoting the construction of new buildings or the rehabilitation of existing
buildings within the Incentive Area; and (b) supporting the establishment of the categories
of new businesses that will (i) significantly increase the overall commercial activity within
the Incentive Area, (ii) attract the City’s residents and tourists into the Incentive Area, and
(iii) increase property values within the City as a whole.
“Incentive” shall mean a grant of any inducement having monetary va lue by the
City that is offered to a person, firm or corporation to pursue a Development that
encourages private investment and/or the creation/retention of jobs. The Incentive may also
include grants from other entities that the City may be able to obtain.
“Incentive Recipient” shall mean the private parties receiving the Incentives from
the City.
“Job” shall mean each new (i) full -time position, or (ii) each full- time equivalent
position that is created as a direct result of the ongoing operation of a Development. For
the purposes of calculating the number of Jobs created by a Development, only those
employed at businesses directly associated with the Development in positions permanently
located within the Incentive Area shall be considered.
Sec. 38.04 - Authorization
(a) Authorization to Grant Incentives.
The Council, at its discretion and on a case -by-case basis, but subject to the
General Eligibility Criteria provided for in Sec. 38.06(a) herein, may enter into an
Incentive Agreement (as defined herein) with a person, firm or corporation providing for
Incentives in order to encourage and support the Development of real property within the
Incentive Area.
(b) Incentive Agreements.
The Incentives shall only be provided to an Incentive Recipient after an agreement
has been entered into between the City and such person, firm or corporation, which
agreement shall set forth: the particulars of the Development; the Incentives to be
provided; and sufficient assurances that the Benefits will accrue to the City and the Goals
will be met by the Development (an “Incentive Agreement” ). Pending the approval by
the Council of any Incentive Agreement and subject to the provisions of Sec. 38.07 herein,
the City Administrator of the City (or any person so delegated by the City Administrator)
5
is authorized to discuss the provisions of this Economic Development Incentive Program,
aid in the completion of any Proposal (as defined herein) and, subject to the final approval
by the Council, negotiate with the potential Incentive Recipient on behalf of the City.
Each Incentive Agreement shall be approved by Council by ordinance. Council is
authorized to provide Incentives in any amounts and for any period of time within the
thresholds provided for herein or within the time periods and thresholds provided for in
any applicable statutory authorization.
Sec. 38.05 - Authorized Incentives.
(a) Multiple Incentives.
The Council may provide to an Incentive Recipient any combination of Incentives
provided for herein; provided, however, that the total amount of Incentives given to a
Development must be in keeping with the Goals and the value of the Benefits accruing to
the City (and its citizens) and must be greater than the financial value of the Incentives to
an Incentive Recipient.
(b) Incentives of the City.
All direct Incentives of the City shall be granted in the form of reimbursements
and refunds of the fees and taxes that have been duly paid to the City, as set for th in this
subsection (b). No upfront abatements of fees or taxes shall be permitted. Where
Incentives continue for a period of more than one year, such Incentives may be graduated
to increase or decrease year-to-year as the Council sees fit, but subject to monitoring by
the City to ensure compliance with the terms of any Incentive Agreement. The Council
may, at its discretion and on a case -by-case basis, enter into an Incentive Agreement to
reimburse or refund any person, firm or corporation the following fees and taxes up to the
amounts and percentages provided for herein:
(i) Up to 100% of the applicable tap fees collected by the City;
(ii) Up to 50% of the building permit fees collected by Oconee County on behalf
of the City;
(iii) Up to 50% of the business license fees collected by the City for as many as
five (5) years;
(iv) Up to 50% of the local hospitality taxes collected by the City for as many
as five (5) years, but funds received through such Incentive are to be spent
only for purposes that are related to tourism, pursuant to S.C. Code § 6-1-
730, and which have been approved by Council and included in the
Incentive Agreement;
(v) Up to 50% of the local accommodations taxes collected by the City for as
many as five (5) years, but funds received through such Incentive are to be
6
spent only for purposes that are related to tourism, pursuant to S.C. Code §
6-1-530, and which have been approved by Council and included in the
Incentive Agreement; and
(vi) Such other Incentives that the Council, at its discretion on a case -by-case
basis, determines are appropriate given the amount or type of investment
made by the Incentive Recipient in the Incentive Area.
(c) State Incentive Programs.
The State programs that may be considered by Council to be included within any
package of Incentives or as a stand- alone set of Incentives for in -City projects located
City-wide, include , but are not limited to the following (as applicable and as may be
amended from time to time):
(i) Property tax credits authorized by the provisions of the South Carolina
Abandoned Buildings Revitalization Act, codified at S.C. Code Ann. §§
12-67-100 et seq. (collectively, the “Abandoned Building Act”). Incentive
Recipients requesting consideration of the Abandoned Building Act by the
Council shall submit an Abandoned Building Act Application form, a copy
of which is attached hereto as Exhibit B.
(ii) Property tax credits authorized by the provisions of the South Carolina
Textiles Communities Revitalization Act, codified at S.C. Code Ann. §§
12-65-10 et seq. (collectively, the “Textiles Revitalization Act”). Incentive
Recipients requesting consideration of the Textiles Revitalization Act by
the Council shall submit a Textiles Revitalization Act Application form, a
copy of which is attached hereto as Exhibit C.
(iii) The South Carolina real property tax credit for the installation of a fire
sprinkler system, codified at S.C. Code Ann. § 12-6-3622.
Sec. 38.06 - Eligibility Criteria.
(a) General Eligibility Criteria.
Except for those Incentives discussed in Sec. 38.05(c) above as authorized by the
State and which are intended by the terms of this Economic Development Incentive
Program to be applied City -wide, in order for a Development to be eligible to receive
Incentives, the Council must determine that the Development meets, or upon completion
will meet, each of the following criteria:
(i) the Development is consistent with Westminster’s Comprehensive Plan
(as it may be amended, revised, or updated from time to time, the
“Comprehensive Plan”), as well as the Goals;
7
(ii) absent the provision of Incentives, the Development would be unlikely to
occur or unlikely to occur at the level or scale contemplated by the
developer thereof;
(iii) the Development must be located within the Incentive Area;
(iv) the minimum threshold investment is one hundred thousand dollars
$100,000 (the “Minimum Investment”). The Minimum Investment may
be comprised of any combination of (i) real property acquisition costs, (ii)
the costs of physical improvements to real property, (iii) or the costs of
capital improvements to City infrastructure. The Minimum Investment
may be c alculated based upon investment in a single property or the
cumulative investment in multiple properties, each within the Incentive
Area. Where multiple uses or businesses are to be located within a single
Development as separate businesses, the Council may, at its discretion on
a case-by-case basis, allocate appropriate portions of the total investment
in the Development to such separate business in order to allow such
business to meet the Minimum Investment eligibility requirement. In order
to meet the th reshold for the Minimum Investment, a Development may
be given a credit towards the Minimum Investment of fifty thousand
dollars ($50,000) in the event at least one Job will be created and
maintained by the Development; and
(v) The intended use of the Development must be for one or more of the
following business purposes: (1) retail uses; (2) tourism-related businesses
or activities; (3) cultural arts activities and associated businesses; (4)
corporate headquarters; (5) research and development; (6) high-
technology growth businesses; (7) professional services offices (doctors,
dentists, lawyers, engineers, accountants and similar professional
services); and (8) other uses, as may be determined by the Council, that
are consistent with the Goals, and the Comprehensive Plan.
(b) Specific Criteria.
The Council may, in its discretion and on a case -by-case basis, include within an
Incentive Agreement any other eligibility criteria that must be met upon completion of a
Development in order to ensure that the Goals are met and that the Development provides
Benefits to the City (and its citizens) in amounts that warrant the implementation of
Incentives.
Sec. 38.07 - Administration and Terms of Delivery.
(a) Application for Incentives.
Except where an applicant seeks only Incentives authorized by the State Incentive
Programs listed in Sec. 38.05(c), in order to be eligible for Incentives, a person, firm or
8
corporation must submit to the City Administrator a proposed set of Incentives for a
Development (a “Proposal”). A form of the Proposal is attached hereto as Exhibit D. The
Proposal must include a sufficient description of the Development, to include, without
limitation, the following information: (i) identification of the property or properties on
which the Developm ent is to be located (the “Subject Property” ) and any acquisition
costs thereof; (ii) the estimated start date and completion date for any work to be
performed on the Subject Property; (iii) a list of any physical improvements that are to be
made to the Subject Property as part of the Development, including a good-faith estimate
of the costs thereof; (iv) the then- current value of the Subject Property and a good -faith
estimate of the value of the Subject Property upon completion of the improvements
thereto; (v) a good faith estimate of the number of Jobs that the Development is projected
to create, including an estimate of the date upon which the estimated number of Jobs will
have been created; (vi) a statement affirming that, based upon any acquisition cost s for
the Subject Property, along with good- faith estimates for the costs of physical
improvements and the number of Jobs created, the Development will meet or exceed the
Minimum Investment requirements of Sec. 38.06(a)(iv); (vii) a good -faith estimate of
other revenue for the City that will be created as a direct result of the Development,
including anticipated business license fees, additional property tax revenue, capital
improvements to City -owned infrastructure and utilities revenue; and (viii) any other
additional information that the Incentive Recipient or the City Administrator deems may
be necessary and helpful for the Council to evaluate and give due consideration to the
Proposal.
(b) Determination of Incentive Amounts.
The amount of Incentives granted to a Development shall be based upon the
amount of the capital investment in the Development, the amount of new revenue for the
City directly created by the Development and the number of new Jobs that will be directly
created by the Development. The amount of Incentives granted to a Development shall in
no case exceed the value of the direct and indirect benefits of the Development to the City.
These amounts shall be expressly included within any Incentive Agreement.
(c) Certification, Commencement and Continuation of Incentives.
(i) No Incentive shall commence or be given until such time as the
Development has been issued a Certificate of Occupancy and/or a
business license as well as a certificate that all terms and benchmarks
included within the applicable Incentive Agreement, including without
limitation benchmarks for capital investment, property valuation, and Job
creation (the “Benchmarks ”), have been fully achieved or otherwise
completed.
(ii) Where Benchmarks, such as the number of Jobs created, are to be met
continuously over a period of time, the Incentive Recipient shall provide
to the City, on an annual basis, satisfactory proof that the Development
has continuously achieved or otherwise complied with such Benchmarks.
9
(iii) If, at any time after completion of a Development or at any time within
the period of time during which a Development is granted Incentives, a
Development fails to achieve or otherwise comply with a Benchmark, the
Council may, at its discretion and on a case-by-case basis: (1) declare the
Incentive Agreement null and void and cease the provision of any future
Incentives; or (2) decrease the amount of Incentives based upon the actual
direct and indirect Benefits of the Development to the City and its citizens.
Sec. 38.08 - Administration of Incentives and Incentive Agreements.
The administration of the application process, specifically including the drafting
of any Proposal, and continuous monitoring of Developments pursuant to applicable
Incentive Agreements shall be the responsibility of the City Administrator and any person
designated to oversee such process by the City Administrator.
Section 2. The Bailey Bill Program
(a) There is hereby enacted by the City, for the purposes discussed above, the Special
Property Tax Assessment Program for Rehabilitated Historic Properties (the “Bailey Bill
Program”). Absent some change to the Bailey Bill which affects or preempts the Bailey Bill
Program established herein, any amendments, modi fications and clarifications to the Bailey Bill
shall become effective, only if approved and enacted by the City.
(b) The Bailey Bill Program shall be codified into the City’s Code of Ordinances. By
and through the enactment of this ordinance, Chapter 39, entitled “SPECIAL PROPERTY TAX
ASSESSMENT PROGRAM FOR REHABILITATED HISTORIC PROPERTIES” shall be added
to Title III “ADMINISTRATION” of the City’s Code of Ordinances. Title III
“ADMINISTRATION,” Chapter 3 9 entitled “ SPECIAL PROPERTY TAX ASSESSMENT
PROGRAM FOR REHABILITATED HISTORIC PROPERTIES ” shall be added to the City’s
Code of Ordinances as follows:
Sec. 39.01 – Title.
This ordinance shall be titled “Special Property Tax Assessment Program for
Rehabilitated Historic Properties.”
Sec. 39.02 – Authority.
Pursuant to Sections 5-21-140 and 4-9-195 of the Code of Laws of South Carolina
1976, as amended (collectively, the “Bailey Bill”), the City is enacting and establishing its
Special Property Tax Assessment Program for Rehabilitated Historic Properties (the
“Bailey Bill Program”).
10
Sec. 39.03 – Definitions.
As used in this Chapter 39, unless the context shall otherwise require, capitalized
terms not otherwise defined herein shall have the meaning ascribed to them in the Bailey
Bill.
Sec. 39.04 – Creation of Special Tax Assessment; Term.
(a) Special Tax Assessment Created.
A special tax assessment is hereby created wherein real property that has complied
with all provisions of the Bailey Bill Program shall receive a property tax assessment for
such real property and any improvements thereon that is based upon the fair market value
of such property during the year that Preliminary Certification of the historic rehabilitation
of such property is granted (the “Special Assessment”). Only work that is performed after
the Preliminary Certification is granted shall be considered for purposes of determining the
Special Assessment.
(b) Term.
The “Assessment Term” means a period of up to 20 years . The Assessment Term
is contingent upon the Expense Percentage (as defined below) of each qualifying property.
“Expense Percentage” means the percentage determined by dividing the rehabilitation
expenses occurring after the Preliminary Certification by the fair market value of the
qualifying property as provided in the Preliminary Certification. If the Expense Percentage
equals:
(i) 20-29% - the Assessment Term shall be 5 years;
(ii) 30-39% - the Assessment Term shall be 10 years;
(iii) 40-49% - the Assessment Term shall be 15 years; and
(iv) 50% over greater - the Assessment Term shall be 20 years.
Any Special Assessment granted pursuant to the provisions of this Bailey Bill
Program shall remain the assessment applicable to such historic property for the purposes
of ad valorem taxes for the applicable Assessment Term. If an application for Preliminary
Certification is filed by May 1 of any year, or Preliminary Certification is granted by
August 1 of any year, the first year of the Assessment Term shall be the year in which such
application was filed or Preliminary Certification was granted, as applicable. Otherwise,
the first year of the Assessment Term shall be the year following the year in which such
application was filed or Preliminary Certification was granted, as applicable.
11
Sec. 39.05 – Eligibility.
In order to be eligible to receive the Special Assessment, a property must be granted
a historic designation by the City Council based upon one or more of the following reasons
(“Eligible Property” or “Eligible Properties”):
(i) the property is listed on the National Register of Historic Places; or
(ii) the property is at least fifty years old , and it also qualifies under the
following:
(1) the property has been designated as an historic property by the City
Council; or
(2) the property is located in a historic district, as may be designated
from time to time, by the City Council.
Sec. 39.06 – Eligible Rehabilitation.
(a) In order to be eligible to receive the Special Assessment, a property must undergo
a historic rehabilitation (a “Historic Rehabilitation ”) that adheres to the Secretary of the
Interior’s Standards for Rehabilitation, together with the City’s zoning standards , as
generally authorized by Section 151.019 of the City’s zoning code, as may be amended
from time to time (together, the “Rehabilitation Standards”).
(b) Rehabilitation Work to be Evaluated Based Upon the Rehabilitation Standards.
The following elements of any Historic Rehabilitation shall be reviewed according
to the Rehabilitation Standards:
(i) repairs to the exterior of the designated building;
(ii) alterations to the exterior of the designated building;
(iii) new construction on the property on which the building is located; and
(iv) for public or commercial buildings, interior alterations for primary public
spaces.
(c) Expenditures for Rehabilitation
Qualified expenditures for any Historic Rehabilitation include the actual costs of
rehabilitation related to one or more of the following:
(i) improvements located on or within the historic building as designated;
12
(ii) improvements outside of and directly attached to the historic building that
are necessary to make the building fully usable; such improvements shall
not include rentable/habitable floor space attributable to new construction;
(iii) architectural and engineering services attributable to the design of the
improvements; and
(iv) costs necessary to maintain the historic character or integrity of the building.
(d) For purposes of Section 39.06(c)(iii) above, the costs of architectural or engineering
services shall be limited to a maximum of twenty percent (20%) of the total qualified
rehabilitation costs. To the extent that the architectural or engineering costs exceed 20% of
the qualified rehabilitation costs of an Eligible Property, such additional costs shall not be
includable when determining the Expense Percentage or the Minimum Expenditure (as
defined below).
Sec. 39.07 – Minimum Expenditures; Fair Market Value.
In order to be eligible to receive the Special Assessment, the total expenditures that
an owner of a n Eligible Property must incur applicable to a Historic Rehabilitation shall
equal or exceed 20 percent of the fair market value of the Eligible Property at the time in
which Preliminary Certification is granted (the “ Minimum Expenditure”). Fair market
value shall be based upon (i) the appraised value of the Eligible Property as certified by a
licensed real estate appraiser and as submitted as part of an application for Preliminary
Certification; (ii) the sales price of the Eligible Property delineated in a bona fide, arms -
length real estate transaction taking place within 12 months of the time that an application
for Preliminary Certification is submitted; or (iii) the most recent appraised value
determined by the Oconee County Assessor.
Sec. 39.08 – Reviewing Authority Designation; Jurisdiction.
The South Carolina Department of Archives and History (“ DAH”) is hereby
designated as the “Review ing Authority,” as such term in used in the Bailey Bill, for the
purposes of this Bailey Bill Program. Submittals hereunder shall comport to the rules,
regulations and procedures of DAH associated with its role as the Reviewing Authority.
Sec. 39.09 – Approval Process.
(a) Application.
In order to be eligible to receive the Special Assessment, an Eligible Property
proposing a Historic Rehabilitation must receive Preliminary Certification by the City
Council using the application and review process provided for in this Section. Any owner
of an Eligible Property may apply to the City for Preliminary Certification of a proposed
Historic Rehabilitation by submitting an Application for Preliminary Certification (an
“Application”), the form of which is at tached hereto as Exhibit E to the planning
13
department of the City. In order to receive consideration, all Applications must be
complete and must include the following fees and other information:
(i) a completed Application, including any application fees that may be
required in the discretion of the City’s staff based upon the budget then in
effect;
(ii) an application fee (such amount to be determined in the City’s annual
budget process);
(ii) a plan detailing the proposed Historic Rehabilitation detailing the scope of
work that is to be performed and demonstrating compliance with the
Rehabilitation Standards;
(iv) sufficient evidence of the current fair market value of the Eligible Property
(see Sec. 39.07 herein); and
(v) the total amount that the owner anticipates will be expended on the Historic
Rehabilitation.
(b) DAH Review.
Provided the finished Application (as to all form and content) has been filed with
the City’s planning department, the City shall thereafter submit the application to DAH for
further review. DAH shall affirm that the Minimum Expenditure is expected to be met and
that the property meets the standard for an Eligible Property. The DAH shall review each
Application and proposed Historic Rehabilitation to ensure that the proposed scope of work
complies with the Rehabilitation Standards. Upon confirmation by DAH that all criterion
have been met, the Application shall be submitted to the City Council for approval. In the
event that the DAH declines to recommend approval to the City Council, the City and the
applicant shall work with DAH to determine the specific reasons for its denial and
thereafter, and subject to DAH’s procedures, the applicant may re-apply under the terms
of this Section.
(c) City Council Preliminary Certification.
Upon an Application receiving a recommendation of approval by the DAH, the
Application shall be considered at the next regularly scheduled meeting of the City
Council, provided that sufficient time remains to include such an Application on the
upcoming meeting agenda. City Council may, by ordinance, approve the Application and
proposed Historic Rehabilitation and, in such event, shall make specific findings of the
following facts regarding the following:
(i) The property constitutes an Eligible Property;
(ii) The Minimum Expenditures are expected to be met; and
14
(iii) The fair market value of the Eligible Property that is to be used to calculate
the Special Assessment and the Expense Percentage.
(e) Substantive Changes.
If at any time during the application process or after Preliminary Certification is
granted, the scope of work considered or approved thereunder is substantively changed in
any way, the applicant must promptly notify the City’s planning department who shall
make a determination as to whether such a change required the prior approval of the City
Council. In the event that such approval is necessary, such a change may be brought
directly before the City Council at its next available reg ularly scheduled meeting for
consideration. Unapproved substantive changes are conducted at the risk of the property
owner and may disqualify the property from eligibility for the Special Assessment.
(f) Assessment for Two Years During Work.
Once a proposed Historic Rehabilitation has received Preliminary Certification, the
Eligible Property shall receive the Special Assessm ent for an initial period of two years
during which the proposed Historic Rehabilitation is undertaken. Any such period shall
apply towards the applicable Assessment Term in Section 39.04(b) herein. In the event
that, after the expiration of two years, the Historic Rehabilitation is not complete but the
Minimum Expenditure has been met, the Special Assessment shall continue for such time
as it is necessary to complete the Historic Rehabilitation. In the event that after the
expiration of two years, the Minimum Expenditures have not been met, the City Council
may, at its discretion, disqualify the property from eligibility for the Spe cial Assessment
and any monies not collected due to the special assessment must be returned to the City
and other affected taxing districts, as applicable.
Sec. 39.10 – Rehabilitation Monitoring; Final Certification.
(a) Monitoring.
During the period of time during which the Historic Rehabilitation is underway,
staff of the City’s planning department or code enforcement department, as applicable, may
inspect the work in progress to ensure that the Historic Standards are met. Inspections of
any exterior work may be made at any time and inspections of any interior work may be
made upon 24-hours’ notice. The refusal of an applicant to permit inspection shall serve
as grounds for the disqualification of the property from eligibil ity for the Special
Assessment. In the event that such an inspection shows substantive deviations from the
approved scope of work or a failure to comply with the Historic Standards, the City Council
may disqualify the property from eligibility for the Special Assessment.
15
(b) Final Certification.
Upon completion of the Historic Rehabilitation, the applicant must notify the
planning department and request that the property be granted Final Certification. The
planning department staff shall inspect the Eligible Property to ensure compliance with the
approved scope of work and the Historic Standards. If compliance is found, the planning
department staff shall grant Final Certification and shall provide the property owner with
sufficient documentation of such Final Certification.
Sec. 39.11 – Notification of the Oconee County Tax Assessor.
Upon receipt of Final Certification, it shall be the responsibility of the property
owner to provide such Final Certification to the Oconee County Assessor in order to secure
the Special Assessment.
Sec. 39.12 – Additional Work; Decertification.
(a) For the remainder of the applicable Assessment Period, the property owner shall
notify the planning department staff of any additional exterior work undertaken on t he
Eligible Property, other than ordinary maintenance. The planning department staff will
present the proposed work to the DAH, as applicable, who will review the work and
determine whether the overall project is consistent with the standards for rehabilitation. If
the additional work is found to be inconsistent, the property owner shall withdraw his
request and cancel or revise the proposed additional work.
(b) Once the Eligible Property has received Final Certification, it shall remain so
certified and m ust be granted the Special Assessment until the property becomes
disqualified by any one of the following:
(i) the expiration of the applicable Assessment Term;
(ii) written notice from the property owner to the planning department staff and
the Oconee County Auditor requesting removal of the Special Assessment;
(iii) removal of the historic designation by the City Council; or
(iv) rescission of the approval of the Historic Rehabilitation by the DAH
because of alterations or renovation by the owner or the owner's estate
which causes the property to no longer possess the qualities and features
which made it eligible for Final Certification.
(c) Notification of any change affecting eligibility must be given immediately to the
Oconee County Assessor, Auditor, and Treasurer.
Section 3. If any section, subsection, sentence, clause or phrase of the Economic Development
Incentive Program, the Bailey Bill Program, or this Ordinance is, for any reason, held or
16
determined to be invalid, such decision shall not affect the validity of the remaining portions of
the Economic Development Incentive Program, the Bailey Bill Program, and/or this Ordinance.
Section 4. Nothing in this Ordinance, the Economic Development Incentive Program, or the
Bailey Bill Program hereby enacted shall be construed to affect any suit or proceeding impending
in any court, or any rights acquired, or liability incurred, or any cause of causes of action acquired
or existing, under any act or ordinance hereby repealed; nor shall any just or legal right or remedy
of any character be lost, impaired or affected by this Ordinance.
Section 5. All ordinances or parts of ordinances inconsistent or in conflict with the provisions
of this ordinance are hereby repealed to the extent of the conflict or inconsistency. This Ordinance
and the provisions of the Economic Development Incentive Program and the Bailey Bill Program
shall take effect immediately upon its enactment by the Council.
DONE AND ENACTED IN COUNCIL ASSEMBLED, this 11th day of October 2022.
CITY OF WESTMINSTER, SOUTH CAROLINA
_________________________________________
Brian Ramey, Mayor
[SEAL]
Jennifer Adams, City Clerk
First Reading: September 13, 2022
Second Reading: October 11, 2022
Reviewed by City Attorney and approved as to form
Andrew Holliday, City Attorney
A-1
EXHIBIT A
City of Westminster – Incentive Area Map
B-1
EXHIBIT B
Abandoned Building Act Application Form
CITY OF WESTMINSTER
ABANDONED BUILDINGS ACT APPLICATION FOR ELIGIBILITY AND CREDIT
AGAINST REAL PROPERTY TAXES
1. PROPERTY INFORMATION
Building Site Address
City , South Carolina (ZIP)
TMS#
Have you filed a Notice of Intent to Rehabilitate with the City? Yes No
*If No, include with this application a letter indicating your intent to rehabilitate the
building site, the location of the building site, the amount of acreage involved in the
building site, the amount of square footage of existing buildings involved in the building
site and the buildings to be rehabilitated, any new construction at the building site, and the
estimated expenses to be incurred in connection with the rehabilitation.
When was the building site abandoned?
*You must provide documentation to support the information provided above. A letter from
the City of Westminster’s business licensing department indicating when the last business
license was revoked is preferred.
Has at least 66% of the building/structure been closed continuously to business or otherwise non-
operational for income producing purposes for a period of at least five (5) years immediately
preceding the date on which the Notice of Intent to Rehabilitate was filed? Yes No
*This calculation is based on the total amount of square footage as certified by the Oconee
County Tax Assessor.
What was the building’s use immediately preceding its abandonment?
*Buildings or structures with an immediately preceding use as a single -family residence
are not deemed abandoned buildings.
On what date did you become the owner of record?
Is the building on the National Register of Historic Places? Yes No
If yes, will any portion of the building be demolished? Yes No
B-2
What was the square footage at the time Notice of Intent is/was filed?
2. PROJECT INFORMATION
Estimated project start date
Estimated project completion date
Estimated rehabilitation costs $ (Total must be more than $250,000 to qualify).
* Eligible expenses do not include cost of acquiring the site or cost of personal property at
the site.
** Expenses increasing the square footage of the site by more than 200% are not eligible.
Do you plan to subdivide the building or structure into separate units or parcels? Yes No
If yes, how many?
Will the rehabilitation work increase the square footage of the building site? Yes No
If yes, how much additional square footage will be added?
Briefly describe your plans for the building site including the future planned use of the building
site and structure(s).
3. OWNER INFORMATION
Name Signature
Address
Date Daytime Telephone
4. AFFIDAVIT
Please complete and sign the applicable attached affidavit.
FOR CITY USE ONLY
DEPT SUBJECT TO REQUEST: REQUEST ASSIGNED TO:
DATE OF ASSIGNMENT: RECEIVED BY:
DATE OF COMPLETION: DATE RESPONSE DUE:
B-3
(For Individual Property Owners)
AFFIDAVIT
STATE OF SOUTH CAROLINA )
)
COUNTY OF OCONEE )
PERSONALLY APPEARED BEFORE ME, the undersigned, who first being duly sworn,
deposes and says, subject to the penalties of perjury, that the information contained in the
foregoing Application For Eligibility and Credit Against Real Property Taxes is true and correct.
Applicant(s)
Sworn to before me this ___ day of _________, 20___
Notary Public for South Carolina
My Commission Expires:
B-4
(For Entity Property Owners)
AFFIDAVIT
STATE OF SOUTH CAROLINA )
)
COUNTY OF OCONEE )
PERSONALLY APPEARED BEFORE ME, of ,
its , duly authorized, who first being duly sworn, deposes and says,
subject to the penalties of perjury, that the information contained in the foregoing Application For
Eligibility and Credit Against Real Property Taxes is true and correct.
Name of Entity
Sworn to before me this ___ day of __________, 20__.
Notary Public for South Carolina
My Commission Expires:
C-1
EXHIBIT C
Textiles Revitalization Act Application Form
CITY OF WESTMINSTER
TEXTILE COMMUNITIES REVITALIZATION ACT APPLICATION FOR
ELIGIBILITY AND CREDIT AGAINST REAL PROPERTY TAXES
1. PROPERTY INFORMATION
Building Site Address
City , South Carolina (ZIP)
TMS #
Have you filed a Notice of Intent to Rehabilitate with the City? Yes No
*If No, include with this application a letter indicating your intent to rehabilitate the textile
mill, the location of the textile mill site, the amount of acreage involved in the textile mill
site, and the estimated expenses to be incurred in connection with the rehabilitation.
Was the building/structure used as a textile mill? Yes No
*In order to be eligible, the building must have been initially used for textile
manufacturing, dying, or finishing operations and for ancillary uses (pursuant to S.C.
Code § 12-65-20(2)) to those operations.
Has at least 80% of the textile mill been closed continuously to business or otherwise non-
operational as a textile mill for income producing purposes for a period of at least one (1) year
immediately preceding the date on which the Notice of Intent to Rehabilitate was filed?
Yes No
*This calculation is based on the total amount of square footage as certified by the Oconee
County Tax Assessor.
When was the textile mill abandoned?
*You must provide documentation to support the information provided above. A letter from the
City of Westminster’s Business Licensing Department indicating when the last business license
was revoked is preferred.
On what date did you become the owner of record?
Were you the owner of record when the textile mill was operational immediately prior to the textile
mill’s abandonment? Yes No
Has the textile mill previously received textile mill credits? Yes No ____
C-2
2. PROJECT INFORMATION
Estimated project start date
Estimated project completion date
Estimated rehabilitation expenses
Acreage of the textile mill site
Do you plan to subdivide the site into separate units or parcels? Yes No
If yes, how many?
Briefly describe your plans for the building site including the future planned use of the building
site and structure(s).
3. OWNER INFORMATION
Name Signature
Address
Date Daytime Telephone
4. AFFIDAVIT
Please complete and sign the applicable attached affidavit.
FOR CITY USE ONLY
DEPT SUBJECT TO REQUEST: REQUEST ASSIGNED TO:
DATE OF ASSIGNMENT: RECEIVED BY:
DATE OF COMPLETION: DATE RESPONSE DUE:
C-3
(For Individual Property Owners)
AFFIDAVIT
STATE OF SOUTH CAROLINA )
)
COUNTY OF OCONEE )
PERSONALLY APPEARED BEFORE ME, the undersigned, who first being duly sworn,
deposes and says, subject to the penalties of perjury, that the information contained in the
foregoing Application for Eligibility and Credit Against Real Property Taxes is true and correct.
Applicant(s)
Sworn to before me this ___ day of _________, 20___
Notary Public for South Carolina
My Commission Expires:
C-4
(For Entity Property Owners)
AFFIDAVIT
STATE OF SOUTH CAROLINA )
)
COUNTY OF OCONEE )
PERSONALLY APPEARED BEFORE ME, of ,
its , duly authorized, who first being duly sworn, deposes and says,
subject to the penalties of perjury, that the information contained in the foregoing Application for
Eligibility and Credit Against Real Property Taxes is true and correct.
Name of Entity
Sworn to before me this ___ day of __________, 20__.
Notary Public for South Carolina
My Commission Expires:
D-1
EXHIBIT D
Form of Proposal
CITY OF WESTMINSTER
PROPOSAL FOR ECONOMIC DEVELOPMENT INCENTIVES
The City of Westminster , South Carolina (the “City”) has enacted its Economic
Development Incentive Program, which is codified in Title III “ADMINISTRATION,” Chapter
38 “ECONOMIC DEVELOPMENT INCENTIVE PROGRAM” of the City’s Code of Ordinances
(the “Economic Development Incentive Program”). Pursuant to the Economic Development
Incentive Program, all requests for Incentives shall be made using this form. This form shall be
signed and submitted, either in person at the Westminster City Hall, which is located at 100 E.
Windsor Street, W estminster, SC 29693, or by mail to the City of Westminster , Attn: City
Administrator, PO Box 399, Westminster, SC 29693. No e-mail or fax requests will be accepted.
Terms used herein and not otherwise defined shall have the meanings ascribed thereto in the
Economic Development Incentive Program.
NAME: DATE OF REQUEST:
ADDRESS:
CITY: STATE: ZIP:
PHONE NUMBER: EMAIL:
DESCRIPTION OF THE PROPERTY (please include tax identification number(s) and any
current or expected acquisition costs, being as specific as possible and attach additional pages if
needed):
ESTIMATED START DATE FOR DEVELOPMENT
DESCRIPTION OF DEVELOPMENT (please include a good faith estimate of expected costs,
being as specific as possible. Attach additional pages if needed):
JOB CREATION (please inc lude good faith estimate of jobs created and expected dates of
implementation):
D-2
ESTIMATES AS TO BENEFITS TO THE CITY FROM THE DEVELOPMENT (may include,
but not limited to business license fees, property taxes, improvements to City-owned infrastructure
or utilities, being as specific as possible and attach additional pages if needed):
OTHER PERTINENT INFORMATION (please attach additional pages if needed):
I, the undersigned, submit the above information to the City and certify that, to the best of
my knowledge, the information supplied hereinabove is factually correct and contains no material
misstatements or other misrepresentations. Addition ally, I affirm and certify that, based on the
acquisition costs of the property described above, the costs of the proposed improvements and the
expected Jobs to be created or retained, the development shall meet or exceed the Minimum
Investment requirements in Sec. 38.06(a)(iv) of the Economic Development Incentive Program.
SIGNATURE:
DATE:
FOR CITY USE ONLY
DEPT SUBJECT TO REQUEST: REQUEST ASSIGNED TO:
DATE OF ASSIGNMENT: RECEIVED BY:
DATE OF COMPLETION: DATE RESPONSE DUE:
E-1
EXHIBIT E
Bailey Bill Program Application Form
City of Westminster
Historic Preservation Commission
BAILEY BILL HISTORIC PROPERTY REHABILITATION APPLICATION
Property Address: __
Property Owner: ______________________________ Phone Number: _____________________________________
Property Owner’s Email Address: ___________________________________________________________________
Applicant: ___________________________________ Phone Number: _____________________________________
Applicant’s Mailing Address:_______________________________________________________________________
Applicant’s Email Address: ________________________________________________________________________
Estimated Project Start Date: ___________________ Estimated Completion Date:_____________________________
Fair Market Value of Property: $_________________________ (Please attach appraisal or other proof of value)
Estimated Project Cost $ ______________________________ (Must meet or exceed 20% of the fair market value)
Historic Designation Status
The property must have been granted a “historic designation” by the Westminster City Council. Check all that apply:
The property is listed on the National Register of Historic Places
_____ The property has been designated as an historic property by the City Council
The property is located within an area that has been designated as a historic district by the City Council
Attachments
The following information must be submitted along with a completed application:
An original signed and completed application
An application fee of $
Plan detailing the proposed Historic Rehabilitation including the following: the areas of the structure or
property that are to be rehabilitated; the scope of work to be done; and detailed information on the materials and
techniques to be used to comply with the Rehabilitation Standards of the City.
Applicant’s Signature: Date:
Owner’s Signature (if not Applicant):
Co-Owner’s Signature (if not Applicant):
The above signatures certify that the information in this application is accurate and complete, that the City may copy
any drawings and materials necessary for review, and that pursuant to S.C. Code Ann. Section 6-29-1145 this property
is not subject to a recorded covenant that is contrary to, conflicts with, or prohibits this activity.
FOR STAFF USE
Application #: Tax Map #: Zoning District:
The work as described in this application and attachments appears to meet the Rehabilitation Standards and
would likely receive final approval if completed as described.
T he work as described in this application and attachments would meet the Rehabilitation Standards if the
Special Conditions on the attached sheet are met.
T he work as described in this application and attachments does not appear to meet the Rehabilitation Standards
and is not approved for this property. The attached sheet describes the specific problems with the proposed work.
Authorized Signature________________________________________ Date:
E-2
DESCRIPTION OF PROPOSED WORK
Use the spaces below to describe the proposed work. Architectural features would include items such as: roof;
exterior brick or siding; windows; doors; site/landscape features; entrance hall; main stair; parlors;
fireplaces/mantles; floors/walls/ceilings; mechanical/ electrical/plumbing; etc. Please feel free to make copies
of this sheet. Use as many spaces as necessary to fully describe your
project.
Architectural feature Approximate date of feature
Describe feature and its condition
Photograph No. Drawing No.
Describe work and impact on feature
Architectural feature Approximate date of feature
Describe feature and its condition
Photograph No. Drawing No.
Describe work and impact on feature
Architectural feature Approximate date of feature
Describe feature and its condition
Photograph No. Drawing No.
Describe work and impact on feature
Architectural feature Approximate date of feature
Describe feature and its condition
Photograph No. Drawing No.
Describe work and impact on feature
Punkin Dr
Green
Thumb
Ln
Long
Dr
Culbertson
Holley Dr
Lakeside Dr
Cass
St
President St
N Piedmont St
S Broad St
E North Ave
Whispering
Hills Dr
Connie Dr
Green St
Bermuda St
Berry Rd
Mockingbird Ln
Wilson Ct
Small St
Midway
Dr
Pride Ct
Mack DrKeener Dr
Huff St
AntiochCt
N Spring St
Jackson
Dr
Cassandra Ct
John St
PowellCt
Satterfield St
Cashin
St
S Piedmont St
Carson St
Bow St
W Abbey St
Kays Ln
Greenfield Rd
Hall Rd
Darlene
Ln
Turkey Nest Dr
E Windsor St
Duvall
Dr
N Alexander
St
Pine
Wood Dr
West Oak Hwy
Arlton
Whiten Cir
Johnson St
Mountain View St
Louise Ct
Walhalla St
Becks Park Dr
Retreat St
James St
Shirley St
Highland Ave
Gaston Cir
College St
Sportin
Life Ln
Amanda Dr
McNair Dr
Long Creek Hwy
Quick St
E Abbey St
Evans St
S Bibb St
N Hampton St
Adams St
Dickson St
D St
Rhyne St
Anderson Ave
Jenkinsville Rd
B St
N Broad St
Commercial
Cir
A St
Freeman
Hill Rd
Frank St
W King St
S Hampton St
Butler
School Rd
Pritchard St
Rustle
Ln
Martin St
Pruitt Dr
Ann Davis St
Brown St
Myers St
Cedar St
Park Ave
Augusta St
Skyland Dr
Wood St
Jenkins St
E Main St
Riley St
E King St
Freeman St
Pump House Rd
Grettas Ln
Duffie StVera Dr
Lane Dr
Donnie Dr
Oak St
Mobley Ct
Doyle St
Wendi Ln
S Pew
St
Jay Jay Ct
Rocky Ridge Dr
Pearson StElizabeth
Burton DrGaines St
Westminster Hwy
Butler St
Standridge Dr
Old
Seneca Rd
Virginia Dr
Marcengill Rd
Morehead Dr
Cornelia
Ave
W North Ave
N Pew St
Jones Dr
Leathers St
W Main St
Holcombe St
W Windsor St
Maple St
Goodlett
St
Leina Dr
N Bibb St
Willow Row
Seed Farm Rd
Robin Rd
Rogers Dr
Simpson St
Hobson St
Lucky St
S Isundega St
W Cobb St
Zimmerman Ave
Earl
Holcombe Dr
S Spring St
Mimosa Rd
N Isundega St
S Alexander St
Parkview St
AlleySt
Nina
Cir
Old Busha Rd
Grey St
Dewey St
Thrift Dr
Stacy
Kevin Dr
Hudson St
Arintha Dr
W Piedmont St
Tiffany Ln
Pine St
Crooked St
Brushy
Hollow Ln
Toccoa Hwy
Hill St
Shannon
Forest Dr
Jack St
Dorn St
Norris St
Emergency Ln
Foundry
Rd
Oakmont
Rd
Bobbys DrVelmas Dr
SandiferBlvd
Clearmont Rd
Campbell
Pond Trl
Hope St
Sunshine
Cir
Dunlop Dr
Dr Johns Rd
Campbell Rd
England St
Homestead Rd
Bryson St
Brock Rd
William Warner Rd
Stone Bridge Cir
?@381
City of Westminster - Incentive Area Map 2022
OCSCGIS 23 Aug 2022
°
0 0.25
Mile
Date of Orthoimagery: 1Q2020
I|I¢
?Ú
I¢
I|
1
STATE OF SOUTH CAROLINA )
)
COUNTY OF OCONEE ) ORDINANCE #2022-10-11-02
)
CITY OF WESTMINSTER )
AN ORDINANCE APPROVING THE EXECUTION AND DELIVERY OF
A POLE ATTACHMENT LICENSE AGREEMENT BY AND BETWEEN
THE CITY OF WESTMINSTER, SOUTH CAROLINA AND SPECTRUM
SOUTHEAST, LLC AND OTHER MATTERS RELATED THERETO.
NOW THEREFORE, be it ordained by the City Council of the City of Westminster (the
“City Council”), the governing body of the City of Westminster, South Carolina (the “City”), in a
meeting duly assembled as follows:
Section 1 Findings. The City Council hereby makes the following findings of fact in
connection with the enactment of this ordinance (this “Ordinance”):
(1) The City is a body politic and corporate located in Oconee County, South Carolina,
entitled to exercise all the powers and privileges provided to municipal corporations in the State
of South Carolina.
(2) Spectrum Southeast, LLC (the “Company”), a Delaware limited liability company
and subsidiary of Charter Communications, Inc.,
furnishes lawful communications services to residents
of the City and wishes to attach the aerial cables, wires, and facilities necessary therefor to poles owned by
the City.
(3) The Company and the City desire to enter into an agre ement (the “Agreement ”)
pursuant to which the City shall issue a non- exclusive license permitting the Company to attach
aerial cables, wires, and facilities to poles owned by the City for the purpose of providing
communications services.
Section 2 Approval of the Agreement . The Agreement, the form of which is
attached to this Ordinance at Exhibit A, is hereby approved. The City Administrator is hereby
authorized to execute and deliver the Agreement and, with the advice of counsel, to approve such
changes to the final form of the Agreement as are necessary and convenient to carry out the intent
of this Ordinance and that are not adverse to the interests of the City , and the execution and the
delivery of the final form of the Agreement by the City Administrator is to serve as conclusive
evidence of the approval thereof by the City.
Section 3 Effective Date; Repealer. This Ordinance is to be effective as of the date
of its second and final reading. All prior ordinances and resolutions conflicting with the provisions
of this Ordinance are hereby repealed.
2
DONE AND ENACTED IN COUNCIL ASSEMBLED, this 11th day of October 2022.
CITY OF WESTMINSTER, SOUTH CAROLINA
_________________________________________
Brian Ramey, Mayor
[SEAL]
Rebecca Overton, City Clerk
First Reading: September 13, 2022
Second Reading: October 11, 2022
Reviewed by City Attorney and approved as to form
Andrew Holliday, City Attorney
EXHIBIT A
POLE ATTACHMENT LICENSE AGREEMENT
-1-
POLE ATTACHMENT LICENSE AGREEMENT
Between
_
CITY OF WESTMINSTER
(“Owner”)
and
SPECTRUM SOUTHEAST, LLC
(“Licensee”)
-1-
POLE ATTACHMENT LICENSE AGREEMENT
THIS LICENSE AGREEMENT (the “Agreement”), effective as of the latest date of execution below (the
“Commencement Date”) by and between the City of Westminster , a municipality of the State of South
Carolina (hereinafter called “ Owner”), and Spectrum Southeast, LLC, a Delaware limited liability
company and subsidiary of Charter Communications, Inc. (hereinafter called “Licensee”).
WHEREAS, Licensee furnishes lawful communications services to residents in the S tate of South
Carolina and desires to place and maintain aerial cables, wires and associated facilities and equipment on
the poles of Owner in the area to be served, and
WHEREAS, Owner shall permit, to the extent it is lawfully and contractually required to do so, the
attachment of said aerial cables, wires, and facilities to its poles subject to the terms and conditions of this
Agreement and applicable law where Owner owns poles.
NOW, THEREFORE, in consideration of the mutual covenants, terms, and conditions herein contained
the parties hereto do hereby mutually covenant and agree as follows:
ARTICLE 1
SCOPE OF AGREEMENT
1.1 Subject to the provisions of this Agreement and applicable law , Owner agrees to issue to
Licensee, for the a ttachment of Licensee’s facilities to Owner’s poles for the purpose of providing any
and all lawful communications services, a revocable, non -exclusive license hereinafter referred to as a
“Permit” authorizing the attachment of Licensee ’s facilities to Owner’s poles. This Agreement governs
the fees, charges, terms and conditions under which Owner issue s such Permit(s) to Licensee. This
Agreement is not in and of itself a license, and before making any attachment to any utility pole except as
otherwise provided herein, Licensee must apply for and obtain a Permit.
1.2 This Agreement supersedes all previous agreements, if any, between Owner and Licensee for th e
attachment of Licensee’s facilities to the poles of Owner. This Agreement shall govern all existing
licenses, permits, and other forms of permission for pole attachments of Licensee’s facilities to Owner’s
Poles as well as all Permits issued subsequent to execution of this Agreement.
1.3 No use, however extended, of Owner’s pole or payment of any fees or charges required under this
Agreement shall create or vest in Licensee any ownership or property rights in such poles , except as
expressly provided by this Agreement.
1.4 Nothing contained in this Agreement shall be construed to require Owner to construct, retain,
extend, place, upgrade, or maintain any pole or other facilities not needed for Owner ’s own service
requirements, except as otherwise required by applicable law or as agreed to by the parties.
1.5 Nothing contained in this Agreement shall be construed as a limitation, restriction, or prohibition
against Owner entering into agreements with other parties regarding the poles covered by this Agreement,
provided that Owner provide access to its poles at just , reasonable, and nondiscriminatory rates, terms,
and conditions.
1.6 Owner may only deny Licensee’s request for a Permit if, on a nondiscriminatory basis, the
proposed attachment cannot be accommodated because of insufficient capacity or for reasons of safety,
reliability, and generally applicable engineering principles, and those limitations cannot be remedied by
-2-
rearranging, expanding, or otherwise reengineering the facilities at the reasonable and actual expense of
Licensee, except as otherwise provided herein.
1.7 Should Owner acquire ownership of poles through purchase or by relinquishment of ownership
from another system or source and Licensee’s facilities are already attached to said poles, the Owner shall
notify Licensee of such acquisition and preclude said poles from questions of authorization during the
next inventor y and said poles and Licensee facilities shall be covered under this Agreement and
considered authorized.
ARTICLE 2
TERM OF AGREEMENT
2.1 This Agreement shall continue in force and effect for a period of five (5) years from and after the
Commencement Date. The Agreement shall automatically extend on the same terms and conditions for
successive one-year terms. Either pa rty may terminate this Agreement after the initial five (5) year term
or successive terms by giving no less than one hundred-eighty (180) days written notice to the other party.
All days referenced herein are calendar days. Notwithstanding any such termi nation, this Agreement
shall continue in full force and effect to the extent the parties are entering into a replacement agreement
but good faith negotiations have not yet concluded.
ARTICLE 3
SPECIFICATIONS
3.1 Licensee’s attachments constructed on Owner’s poles shall be placed and maintained at all times
in accordance with the requirements and specifications of the National Electrical Safety Code (“NESC”)
published by the Institute of Electrical and Electronics Engineers and with Owner’s standards in e ffect on
the date of the installation. Any standard adopted by Owner that exceeds the NESC shall be applied on a
nondiscriminatory basis and shall be necessary for demonstrable safety purposes. Such requirements and
specifications may be modified, revise d, supplemented or replaced from time to time, upon sixty (60)
days written notice to Licensee, but in all cases, including with respect to Owner’s standards, NESC
grandfathering provisions shall apply to Licensee and Licensee shall in no event be required to upgrade or
retrofit existing facilities that were compliant when originally installed and all such revisions shall apply
on a prospective basis.
3.2 Licensee acknowledges that other users, having similar services, have been granted and may
hereafter be granted rights similar to those granted in this Agreement, and that this Agreement is not an
exclusive contract for the grant of such rights to Licensee. Owner will maintain such agreements without
favor to any particular party, service, or licensees, including Owner’s communications affiliate , if any.
Except as may be permitted pursuant to Article 12 of this Agreement with respect to Owner moving the
facilities of Licensee, no provision of any such agreement, including this Agreement, shall permit any
party thereto to move, remove, adjust or change the attachments of other parties to such agreements
without the written consent of all affected users and of Owner. In no event will Licensee be required to
incur any cost to accommodate any other party, i ncluding Owner’s communications affiliate, if any,
except as otherwise provided by law, or to correct a violation of the NESC caused by any other party,
including Owner and Owner’s communications affiliate.
ARTICLE 4
ATTACHMENT FEES
4.1 Licensee shall pay an annual fee per pole (“Attachment Fees”) in the amount shown in Exhibit A,
attached hereto and made a part hereof by reference.
-3-
4.2 On or before the first day of January of each year , Owner shall invoice Licensee for the annual
Attachment Fees, provided that Owner shall provide sixty (60) days’ notice prior to imposing any
increase in Attachment Fees from the previous year for Licensee’s review and comment . No such
increase shall exceed three percent (3%) of the previous year’s annual Attachment Fee. The rental period
shall cover the twelve -month period between January 1 and December 31 of the current year ; and, the
annual Attachment Fees shall be based upon the number of Owner poles occupied by Licensee’s existing
attachments as of December 31 of the prior year. Licensee shall pay any undisputed invoice within forty-
five (45) days of receipt thereof. Interest on amounts included on any undisputed invoice shall accrue on
the unpaid undisputed Attachment Fees at the rate set for that period by the IRS for individual
underpayments pursuant to Section 6621 of the IRS Code.
4.3 Owner and Licensee shall promptly seek to resolve any invoice or payment dispute made in good
faith. Any dispute claim must be presented within thirty (30) days of a notice of increase or invoice. In
the event either party determines that there is an error or erroneous charge in the amount billed in any
statement rendered by Owner to Licensee, the error or erroneous charge shall be adjusted within forty-five
(45) days of a f inal determination of whether an error has occurred and the parties will be made whole
accordingly. Notwithstanding the above, neither party shall be liable to the other for errors or erroneous
charges in any bill or statement originally issued more than two years prior to the day on which the error
is subsequently determined to have occurred. Each party reserves its righ ts to avail itself of any remedy
at law or equity for any dispute that cannot be resolved by the parties.
ARTICLE 5
PROCESS FOR PERMITTING ATTACHMENTS
5.1 To obtain a Permit, Licensee must submit Permit Application (the “Application”) attached at
Exhibit B. Licensee’s Application shall be accompanied by Licensee’s construction plans and drawings.
5.2 Application Review and Survey : Owner sh all review Applications in accordance with the
following provisions:
5.2.1 Application Completeness. Owner shall review Licensee’s Application for completeness ,
and notify Licensee of Owner’s decision, within 15 business days of receiving the Application. An
Application is complete if it provides the Owner with the information necessary to begin to survey
affected poles. If the Owner does not respond within 15 business days or rejects the application without
specifying a reason, the Application is deemed complete. If Owner timely notifies Licensee that its
Application is not complete, then Owner must specify all reasons for finding it incomplete. Any
resubmitted Appli cation need only address Owner’s reasons for incompleteness and shall be deemed
complete within 5 business days of submission, unless Owner specifies which reasons were not addressed
and how the resubmitted Application did not sufficiently address the reasons. Licensee may follow the
resubmission procedure in this paragraph as many times as it chooses so long as in each case it makes a
bona fide attempt to correct the reasons identified by Owner, and in each case the deadline set forth in this
paragraph shall apply to Owner’s review.
5.2.2 Survey. Owner shall complete a survey of poles for which access has been requested
within 45 days of receipt of a complete Application (or within 60 days for Applications including more
than 300 poles). Owner must permit Licensee and any existing attachers to be present for the survey in
order to ensure on-the- ground discussions. Owner shall use commercially reasonable efforts to provide
the affected attachers with advance notice of not less than 3 business days of any field inspection as part
of the survey and shall provide the date, time, and location of the survey, and name of the contractor
performing the survey. If Owner fails to complete the survey within the applicable timeframe, Licensee
-4-
may conduct a survey using its own approved contractor. I n such situation, Licensee must (i) permit
Owner and any existing attachers to be present for any field inspection conducted as part of the survey;
and (ii) use commercially reasonable efforts t o provide Owner and any affected existing attached with at
least three (3) business days’ notice with the date and time of the survey, a description of the work
involved, and the name of the contractor being used for the survey . If Licensee provides the survey,
Owner must grant, deny, or grant conditional access within 10 days of the date Licensee provides the
survey.
5.2.3 Application Review On the Merits. Subject to the foregoing, Owner shall respond to
Licensee’s Application either by granting access, or denying access within 45 days of receipt of a
complete Application (or within 60 days for Applications including more than 300 poles). Access may
not be denied based on preexisting violations caused by a party other than Licensee, including Owner, and
the Owner may not charge Licensee to bring poles, attachments, or third party equipment into compliance
with the sp ecifications set forth above if such poles, attachments, or third party equipment were out of
compliance because of work performed by a party other than Licensee, including Owner or Owner’s
communications affiliate, if any, prior to the request for attachm ent. If access is denied, the denial must
be specific, include all relevant evidence and information supporting the denial, and explain how that
evidence and information relate to a denial of access for reasons of insufficient capacity, safety,
reliability, or generally applicable engineering standards. If the response is that access is conditioned on
the performance of make -ready, Owner shall present a detailed, itemized estimate, on a pole- by-pole
basis, if requested, of charges to perform all necessary make-ready within 14 days of the response.
Owner shall provide documentation that is sufficient to determine the basis for all charges, including any
projected material, labor, and other related costs that form the basis of the estimate. Owner may not
charge Licensee to replace any pole that was scheduled for removal, prior to Licensee’s Application , nor
shall Licensee be required to bear costs, including for installing or changing out poles, that are not
necessitated solely as a result of Licensee’s Pole Attachments. In no event shall Owner be obligated to
replace any Pole, and no provision of this Agreement shall be construed as compelling the City to replace
any Pole.
5.3 Owner may withdraw an outstanding estimate beginning 14 days after the estimate is presented.
Licensee may accept the estimate and make payment any time after receipt of the estimate, except after
the estimate is withdrawn . I f the final cost of the make-ready work is greater than th e estimate, the
Owner shall also send Licensee a de tailed, itemized final invoice of the actual make -ready charges
incurred, on a pole -by-pole basis. If the final invoice is less than the estimate, Owner shall refund any
overages.
5.4 Make-Ready Work: Make-ready work shall be undertaken pursuant to the following provisions.
5.4.1 After Licensee pays Owner the amount specified in the estimate, Owner must proceed
with the make-ready work and shall complete such work no later than 30 days from payment (or 75 days
for Applications including 300 poles that require make ready), unless the Owner requests that Licensee
approve a reasonable alternative deadline for performing such make-ready work, which Licensee shall not
unreasonably deny. Upon completion of the make-ready work, Owner shall sign and return a copy of the
approved Application for Permit authorizing Licensee to make its Attachment(s). The parties may
mutually agree to an alternative process for addressing make -ready work, such as allowing the Licensee
to hire approved contractors of the Owner for Owner’s make-ready work.
5.4.2 When the make-ready work is complete, Owner shall notify Licensee, and Licensee shall
then have the right to install its facilities in accordance with the approved Application. Except as
otherwise agreed to by the par ties, Licensee must make its a ttachments to Owner’s poles within one
hundred twenty (120) days of receipt of notification that the make -ready w ork is complete. Such
-5-
timeframe may be extended by Owner provided Licensee makes a written request for such extension and
is diligently pursuing its work.
5.4.3 If Owner does not complete the make-ready work by the date specified in this paragraph
(or the timeframe mutually agreed to by the parties), then Licensee may conduct the make -ready work
instead, and hire a properly trained and qualified contractor to do the make-ready work. In such situation,
Licensee must (i) permit Owner and any existing attachers to be present for any make -ready work; and
(ii) use commercially reasonable efforts to provide Owner and any affected existing attached with at least
five (5) days’ notice with the date and time of the make -ready work, a description of the work involved,
and the name of the contractor being used. Licensee shall notify Owner or an existing attacher
immediately if make-ready work damages the equipment of Owner or an existing attacher or causes an
outage that is reasonably likely to interrupt the service of Owner or existing attacher. Upon receiving
notice from Licensee, Owner may (i) Complete any necessary remedial work and bill the new attacher for
the reasonable costs related to fixing the damage; or (ii) require Licensee to fix the damage at its expense
immediately following notice from Owner. Licensee shall notify Owner and existing attachers within 15
days after completion of the make-ready on a particular pole. The notice shall provide Owner and existing
attachers at least 90 days from receipt in which to inspect the make-ready work. Owner has 14 days after
completion of its inspection to notify Owner of any damage or code violations caused by make-ready
work conducted by Licensee on their equipment. If Owner n otifies Licensee of such damage or code
violations, then Owner shall provide adequate documentation of the damage or the code violations.
Owner may eit her complete any necessary remedial work and bill Licensee for the reasonable costs
related to fixing the damage or code violations or require Licensee to fix the damage or code violations at
its expense within 14 days following notice from Owner.
5.4.4 Owner acknowledges that any contractor of Owner performing work within the City of
Westminster must obtain a business license prior to performing such work, and Owner agrees to notify
any such contractor of such requirement.
5.5 To the extent permitted under any other agreement with any other attacher, the costs of
modifying a pole must be borne by all parties that obtain access to the pole as the result of the
modification or that directly benefit from the modification. Each party that obtains access to a pole as a
result of a modification and each party that directly benefits from the modification shall share
proportionately in the cost of the modification. Except as otherwise provided in this subsection, a party
with a preexisting attachment to the modified pole is considered to directly benefit from a modification if,
after receiving notification of that modification, it adds to or modifies its attachment. A party with a
preexisting attachment to a pole is not required to bear any of the costs of r earranging or replacing its
attachment if that rearrangement or replacement is necessitated solely as a result of an additional
attachment or the modification of an existing attachment sought by another party, unless the modification
is necessitated by Owner’s core electric service, except as otherwise provided by law.
ARTICLE 6
fING
6.1 Licensee shall provide prior notice to Owner at least 15 days prior to overlashing any existing
attachment, including the specific existing attachments to be overlashed and sufficient information
regarding its overlash to allow the Owner to determine the impact of Licensee overlash on the pole
loading. Owner shall notify Licensee within 7 days of receipt of such notice if it believes the applicable
overlash will cause damage to or result in code violations with respect to any applicable pole or facility of
the Owner , or if Owner requires additional information to make such determination. Absent such a
-6-
response, Licensee will proceed with overlash . Licensee shall notify O wner upon the completion of any
such overlash. There shall be no additional annual Attachment Fee for overlashing.
ARTICLE 7
EASEMENTS AND RIGHTS-OF-WAY FOR LICENSEE’S ATTACHMENTS
7.1 Owner does not warrant or assure to Licensee any right -of-way privile ges, uses or easements.
Licensee shall be responsible, as required by law, for obtaining its own governmental permits and lawful
easements from any third party property owner(s), lien holder(s), and other necessary and appropriate
parties. Under no circumstances shall Owner be liable to Licensee or any other party in the event
Licensee is prevented by a third party from placing and/or maintaining its a ttachments on Owner’s poles.
Accordingly, Owner’s acceptance of Licensee’s Application and issuance of a Permit shall never be
construed otherwise.
7.2 Licensee will defend and hold harmless Owner against any claims by third parties that the
necessary easements were not obtained , any third party claims for trespass, or any other third party -
instituted cause of action, provided Owner provide prompt notice of such claims to Licensee . Should a
final order be entered by a court of competent jurisdiction requiring Licensee to remove its a ttachments,
Licensee shall do so forthwith, and upon its failure to do so w ithin the timeframe required by such Order,
Owner may remove Licensee's facilities at Licensee’s expense without incurring any obligation to
Licensee for loss or damage to Licensee’s facilities except to the extent of Owner’s negligence or willful
misconduct.
ARTICLE 8
MAINTENANCE
8.1 Owner shall, at its own expense, bear the responsibility to maintain, replace, reinforce, or repair
poles.
8.2 Licensee shall require that all employees, contractors, or employees of contractors who work on
Owner’s poles on behalf of Licensee are properly qualified and trained in climbing and working on
Owner’s poles safely. Licensee shall specifically and adequately warn, by reasonable means, each and
every employee and contractor of the inherent dangers of making contact w ith Owner’s electrical
conductors and/or electrical equipment before such employees or contractors are permitted to perform
work on or near Owner’s facilities.
8.3
Owner makes no express or implied warranty or representation regarding the condition or s afety
of the poles or other facilities of Owner. Licensee expressly assumes responsibility for determining the
condition of all poles to be used by Licensee, whether for the placement of a ttachments, maintaining or
rearranging attachments, or for any othe r reasons. Except for performing transfer work from
unserviceable poles to replacement poles, Licensee shall not permit its employees or contractors to work
on poles that are known to be unserviceable until Owner has corrected the unserviceable condition or has
determined that the pole is serviceable. Licensee will immediately notify Owner if any of Licensee’s
employees, agents, contractors, or employees of contractors become aware of unserviceable poles or other
conditions, whether hazardous or otherwise, that require the attention of Owner for evaluation and
possible correction.
-7-
ARTICLE 9
UNAUTHORIZED ATTACHMENTS AND INVENTORY
9.1 Owner may assess a fee for any Licensee a ttachment that has not been authorized in accordance
with this Agreement (“Unauthorized Attachment”). The fee for Unauthorized Attachments shall be equal
to five (5) times the current annual Attachment Fee.
9.2 Owner may conduct an inventory of Licensee’s a ttachments to verify the number of Licensee’s
billable a ttachments. Any such inv entory may be conducted no more frequently than once every five
years. Owner must provide at least ninety (90) days’ notice of any such inventory so that Licensee may
budget and prepare for and observe such inventory. All inventories shall include all at tachers, including
Owner’s communications affiliate, if any. Prior to such inventory, the projected costs of the inventory
shall be submitted to Licensee for approval. Licensee may provide input regarding the scope of the
inventory and the selection of t he contractor to perform the inventory, but the final decision regarding
scope of the inventory and choice of the contractor shall rest with Owner unless the cost is above industry
standard. All records, reports, and results of an inventory will be made available to Licensee. If the
inventory discloses Licensee is attached to more poles than Licensee has been paying Annual Attachment
Fees for, the excess a ttachments shall be deemed Unauthorized Attachments and subject to the
Unauthorized Attachment fee de scribed above. If Unauthorized Attachments amount to 10% or more of
the total number of Licensee’s attachments, Licensee shall bear a proportionate share of the the cost of
such inventory based on the number of poles it occupies.
9.3 In order to confirm that an Unauthorized Attachment has not been authorized in accordance with
this Agreement under Section 9 .1 above, and confirm that an Unauthorized Attachment fee is warranted
under Section 9.2 above, Owner shall identify each Unauthorized Attachment in its notice by pole number
and location and Licensee shall have a reasonable period of time to verify the results. Each party shall
cooperate with the other during the verification period.
ARTICLE 10
SAFETY VIOLATIONS
10.1 No more than once every five year s, unless demonstrable safety conditions caused by Licensee
requires more frequent inspections, Owner may require all attachers, including Owner and Owner’s
communications affiliate, if any, to participate in a joint safety inspection of all pole facilitie s to
determine whether those facilities comply with the requirements of Section 3.1. Each party shall be
responsible for its own costs in participating in any such inspection, and Owner shall not seek
reimbursement for the inspection from Licensee. Owner shall provide at least ninety (90) days’ advance
notice of any such inspection so that all parties may budget, prepare for and fully participate in the
inspection.
10.2 If Licensee’s a ttachments are out of compliance with the safety specifications , whet her
discovered during a safety inspection or otherwise, then Owner will provide written notice to Licensee of
the non- compliant attachment containing the pole number, location, and description of the problem.
Licensee must either contest the notice of non -compliance in writing or correct them within 30 days of
receipt of the written notice or such longer period as may be necessary under the circumstances.
10.3 The cost of correcting any violation shall be borne by the party that created the violation,
including Owner and Owner’s communications affiliate, if any, and in no event will Licensee be required
to incur any cost necessary to correct a violation caused by any other party, including Owner or Owner’s
affiliate. In cases where Licensee assists in the correction of a violation caused by another party,
including Owner, Owner shall reimburse Licensee for any and all costs incurred by Licensee, but only to
-8-
the extent, and up to the amount of, any reimbursement that Owner receives from such party, the
collection of which the Owner shall diligently pursue.
ARTICLE 11
ATTACHMENTS REMAINING AT END OF TERM
11.1 Licensee may make additional a ttachments to Owner’s poles after th is Agreement has been
terminated provided that Owner and Licensee intend to enter into a replacement agreement and /or are
engaged in good faith negotiations to enter into a new Agreement.
11.2 If either party terminates this Agreement with both parties not intending to negotiate a new
Agreement, Licensee shall remove its a ttachments from the poles of Owner within a mutually agreed
upon schedule, which shall not exceed 180 days
ARTICLE 12
TRANSFERS, RELOCATION AND RESERVATION OF SPACE BY OWNER
12.1 Owner may replace or relocate poles for any reason, including without limitation when exi sting
poles have deteriorated, when new attachers require additional pole space, and when poles must be
relocated at the request of a governmental body or a private landowner. In such cases, Licensee shall,
within 30 days after receipt of written notice, or any other time prescribed by applicable law, transfer its
attachments to the new poles. If Licensee’s transfer is not timely performed, the Owner may, at its option
transfer Licensee’s attachments and Licensee shall reimburse Owner for the actual costs of completing
such work. If Owner elects to do such work, it shall not be liable to Licensee for any loss or damage
except when caused by Owner’s negligence or willful misconduct. If Owner opts not to transfer
Licensee’s attachments, Licensee shall become liable for and own the old pole.
12.2 Should Owner, at any time, reasonably require the space Licensee’s attachments occupy on its
poles for the provision of its core electric service, Licensee shall, upon receipt of sixty (60) days’ notice
(a) rearrange its attachments to other space if available on the pole, at its own expense, (b) vacate the
space by removing its attachments at its own expense or (c) if no space is available and Licensee does not
wish to remove its attachments, Licensee may request Owner replace the pole with a larger pole that can
accommodate Licensee’s attachments. Licensee shall bear its pro rata share of cost of such replacement ,
along with all other attachers benefitting from such replacement, and transfer its a ttachments to the new
pole at its own expense ; provided however, if a new pole is necessitated solely to accommodate
Licensee’s proposed attachments, Licensee shall be considered the sole benefitting attacher.
12.3 Existing Permit(s) shall remain valid and transfer with a ny attachment transfers to new poles
when replacement or relocation is necessary.
ARTICLE 13
ABANDONMENT OF POLES
13.1 Upon sixty (60) days’ notice to Licensee, Owner may in its sole discretion abandon or remove
any attached pole. Within this 60-day period, unless granted additional time by Owner, Licensee shall
remove its Attachments and may place its facilities underground if authorized to place its facilities
underground, transfer its facilities to the nearest facilities owned by Owner if authorized by Owner, or
take other action not inconsistent with this Agreement. If, at the expiration of the 60- day period, Owner
shall have no attachments on such pole but Licensee shall not have removed all of its a ttachments, Owner
may remove Licensee’s a ttachments and Licensee shall reimburse Owner for the actual costs of
completing such work. If Owner elects to do such work, it shall not be liable to Licensee for any loss or
-9-
damage except when caused by the Owner ’s negligence or willful misconduct. If Owner opts not to
address Licensee’s attachments, Licensee may become liable and own the old pole.
ARTICLE 14
RIGHTS OF OTHER PARTIES
14.1 Nothing herein shall be construed to limit the right of Owner, by contract or otherwise, to confer
upon others, not parties to this Agreement, nondiscriminatory rights or privileges to use the poles covered
by this Agreement. Rights granted to third parties shall not infringe upon the rights of the Licensee in this
Agreement.
14.2 If accommodating Licensee’s new attachment requires rearranging any other existing attachment
on Owner’s pole(s), Owner shall give notice thereof to such existing attacher and such attacher shall
cooperate with Licensee in the rearrangement of their facilities. Licensee shall bear the expense of
necessary rearrangement of the existing attacher’ s attachment(s), provided such costs are reasonable and
are no more than the actual cost of doing the work . Licensee does not have the right to rearrange the
facilities of others except with written permission from that attacher.
14.3 If other users require the rearrangement of Licensee’s Attachments in order to attach their
facilities under the authority of Make Ready Construction plans approved by Owner for such other user’s
work, Licensee agrees to reasonably cooperate with such user in scheduling and performing the work and
the other user shall bear the expense of such rearrangement, provided that any cost charged to the other
user shall be reasonable and shall be no more than Licensee’s actual cost of doing the work.
ARTICLE 15
ASSIGNMENT OF RIGHTS
15.1 Licensee shall not assign or otherwise dispose of this Agreement, or of any of its rights or
interests hereunder without the prior written consent of Owner, such consent not to be unreasonably
withheld, conditioned or delayed . Provided, however, Licensee may assign or transfer this Agreement
and the rights and obligations hereunder to any entity controlling, controlled by, or under common control
with Licensee without the consent of Owner, so long as Licensee provides written notice to Owner within
a reasonable timeframe thereafter. No such permitted assignment shall relieve Licensee, the permitted
assignee, or any other party liable to Owner from any obligations, duties, responsibilities, or liabilities to
Owner under this Agreement. This Agreement shall be binding upon the successors and/or assigns of
both parties.
15.2 Nothing contained herein is intended to allow Owner to interfere with Licensee’s leasing of dark
fiber or capacity in its facilities, provided that the renting or leasing of dark fiber or capacity in Licensee’s
facilities does not give Licensee’s customer the right of any kind to physically access Owner’s poles and
Licensee’s customer is specifically prohibited from climbing Owner’s pol es or otherwise working on the
facilities that are attached to Owner’s poles.
ARTICLE 16
WAIVER OF TERMS OR CONDITIONS
16.1 The failure of either party to enforce or insist upon compliance with any of the terms or
conditions of this Agreement shall not constitute a waiver or relinquishment of any such terms or
conditions, but the same shall be and remain at all times in full force and effect.
-10-
ARTICLE 17
PAYMENT OF TAXES
17.1 Each party shall pay all taxes and assessments lawfully levied on its own poles o r property
attached to poles. Taxes and the assessments which are levied on its poles shall be paid by Owner
thereof, but the portion of any tax (except income taxes), fee, or charge levied on Owner’s poles solely
because of their use by Licensee shall be paid by Licensee , except if those taxes are recovered in the
Attachment Fee.
ARTICLE 18
INSURANCE
18.1 Licensee shall take out and maintain throughout the period during which this Agreement shall
remain in effect the following minimum insurance:
A. Workers’ compensation insurance covering all employees of Licensee pursuant to South
Carolina law. Contractors, employees of contractors, subcontractors and employees of
subcontractors who shall perform any of the obligations of Licensee hereunder, shall be required
by Licensee to take out and maintain such insurance, whether or not such insurance is required by
the laws of the state governing the employment of any such employee. If any employee is not
subject to the workers’ compensation laws of such state , such insurance shall extend to such
employee voluntary coverage to the same extent as though such employee were subject to such
laws.
B. Commercial General L iability and property damage liability insurance covering all
operations under this Agreement wi th limits for bodily injury or death in any one event not less
than $2,000,000.00 and limits for property damage not less than $1,000,000.00.
C. Automobile liability insurance for owned and hired automobiles with limits of not less
than $2,000,000.00 for injury or death in any one event and limits for property damage not less
than $1,000,000.00.
18.2 The policies of insurance shall be in such form and issued by such insurer as shall be consistent
with industry practices.
18.3 Licensee shall furnish to Owner, within thirty days of the Commencement Date and upon renewal
a certificate evidencing compliance with the requirements of this Article 18. This certificate will list
Owner as an additional insured and will provide that in the event of cancellation o f any of the said
policies of insurance, the insuring company shall give all parties named as insureds notice of such
cancellation.
ARTICLE 19
SERVICE OF NOTICES
19.1 It is expressly agreed and understood between Owner and Licensee that any notice require d to be
given to either Owner or Licensee pursuant to this Agreement shall be in writing and sent by US Mail, or
by recognized national overnight delivery service, or electronic mail and shall be deemed received upon
actual delivery or refusal of delivery as evidenced by the records of the US Postal Service or delivery
service as the case may be.
19.2 Notices shall be sent addressed as follows:
-11-
If to Licensee: Spectrum Southeast, LLC
Director, Field Engineering
1511 South Batesville Road
Greer, SC 29650
with a copy for Legal Notices to:
Charter Communications
Legal Department-Operations
12405 Powerscourt Drive
St. Louis, MO 63131
If to Owner: City of Westminster
Attn: City Manager
PO Box 399
Westminster, SC 29693
or to such other address as either party may designate by notice to the other party from time to time in
accordance with the terms of this Article.
ARTICLE 20
SUPPLEMENTAL AGREEMENTS
20.1 Neither Owner nor Licensee is under any obligation, express or implied, to amend, supplement or
otherwise change or modify any of the provisions of this Agreement, provided, however, that in the event
of a change in law, the parties shall work in good faith to amend, supplement or otherwise change or
modify any of the provisions of this Agreement as such law may require. I f the parties agree to amend,
supplement or otherwise change or modify any of the provisions of this Agreement, then any such
amendment, supplement, change or modification, to be enforceable, must be evidenced by w ritten
documentation duly executed by both parties. Without any such duly executed, written documentation of
any amendment, supplement, change or modification, any oral discussions relating thereto shall not be
binding upon Owner or Licensee.
20.2 Nothing in the foregoing shall preclude the parties to this Agreement from preparing in writing
such supplemental operating routines or working practices as they mutually agree to be necessary or
desirable to effectively administer the provisions of this Agreement so long as each party has at least one
copy of such operating routines and/or working procedures.
ARTICLE 21
DEFAULT
21.1 Except in the event of a bona fide dispute, i f either party is in material default under this
Agreement and fails to correct such default within the cure period specified below, Owner /Licensee (as
applicable) may, at its option:
(a) declare this Agreement to be terminated in its entirety;
(b) terminate the authorization covering the pole(s) with respect to which such default shall have
occurred;
-12-
(c) correct such default; and the defaulting party shall reimburse the other for the actual costs of
doing the work; and/or
(d) seek specific performance of the terms of this Agreement or applicable law through a court of
competent jurisdiction or in the appropriate regulatory forum, upon the other party’s default or
failure to adhere to applicable law.
For a period of thirty (30) days following receipt of written notice from the non-defaulting party (or, for
defaults of a nature not susceptible to remedy within this thirty (30) day period within a reasonable time
period thereafter), the defaulting party shall be entitled to take all steps necessary to cure any defaults.
The 30-day notice and cure period does not apply to any default by Licensee of its undisputed payment
obligations under this Agreement.
Owner and Licensee shall schedule a meeting to resolve any alleged default within 10 days of r eceipt of
the notice of default. If such alleged Default remains unresolved upon the expiration of the thirty (30)
day period following a dispute notice (provided that the parties may mutually agree to extend such
negotiation period), the parties may pursue remedies available under applicable law or equity.
21.2 The remedies set forth in this Article are cumulative and in addition to any and all other remedies
either party may have at law or in equity.
ARTICLE 22
INDEMNIFICATION
22.1 Indemnification of Owner. Licensee shall indemnify, protect and save harmless Owner from and
against any and all claims and demands for damages to property and injury or death to persons, including
payments made under any Workers' Compensation Law or under any plan for employees’ disability and
death benefits, which may be caused by Licensee’s negligence or wil lful misconduct. In no way limiting
the foregoing, in the event that Licensee or any contractor hired by Licensee conducts any make -ready
work, Licensee shall indemnify, protect and save harmless Owner from and against any and all claims and
demands for damages to property and injury or death to persons, including payments made under any
Workers’ Compensation Law or under any plan for employees’ disability and death benefits, which may
be caused by Licensee’s or Licensee’s contractor’s negligence or willfu l misconduct in connection with
such make-ready work. The foregoing indemnity shall not apply to the extent of Owner ’s negligence or
willful misconduct.
22.2 [Reserved].
22.3 The obligations of this Section 22 shall survive termination or non-renewal of this Agreement, to
the extent of the applicable statute of limitations.
22.4 NOTWITHSTANDING ANYTHING TO THE CONTRARY HEREIN, NEITHER PARTY
SHALL BE LIABLE TO THE OTHER PARTY OR THE OTHER PARTY’S CUSTOMERS FOR
CONSEQUENTIAL, INCIDENTAL, PUNITIVE, EXEMPLARY OR INDIRECT DAMAGES
SUFFERED BY THE OTHER PARTY OR BY ANY CUSTOMER OF THE OTHER PARTY
FOR LOST PROFITS OR OTHER BUSINESS INTERRUPTION DAMAGES, WHETHER BY
VIRTUE OF ANY STATUTE, IN TORT OR IN CONTRACT, UNDER ANY PROVISION OF
INDEMNITY, OR OTHERWISE, REGARDLESS OF THE THEORY OF LIABILITY UPON
WHICH ANY SUCH CLAIM MAY BE BASED.
-13-
ARTICLE 23
FORCE MAJEURE
23.1 Neither Party shall be liable for any delay or failure in performance of any part of this Agreement
resulting from acts of God, acts of civil or mi litary authority, embargoes, epidemics, war, terrorist acts,
riots, insurrections, fires, explosions, earthquakes, nuclear accidents, floods, power blackouts, or
unusually severe weather. In the event of any such excused delay in the performance of a party ’s
obligation(s) under this Agreement, the due date for the performance of the original obligation(s) shall be
extended by a term equal to the time lost by reason of the delay.
ARTICLE 24
MISCELLANEOUS PROVISIONS
24.1 Nothing contained in this document, or in any amendment or supplement thereto, or inferable
herefrom, shall be deemed or constructed to (1) make Licensee the agent, servant, employee, joint
venturer, associate, or partner of Owner, or (2) create or establish any partnership, joint venture, agency
relationship or other affiliation or association between Owner and Licensee. The parties hereto are and
shall remain independent contractors. Neither party shall have the right to obligate or bind the other party
in any manner to any third party.
24.2 Each party represents that it has the full power and authority to enter into this Agreement and to
convey the rights herein conveyed.
24.3 This Agreement is deemed executed in and shall be construed under the laws of the State of
South Carolina.
24.4 Within this Agreement, words in the singular number shall be held and construed to include the
plural, and words in the plural number to include the singular, and the use of any gender shall be
applicable to all genders unless the context otherwise requires. Titles appearing at the beginning of any
subdivisions hereof are for convenience only. They do not constitute any part of such subdivisions, and
shall be disregarded in construing the language contained in such subdivisions. The use of the words
“herein,” “hereof,” “hereunder” and other similar compounds of the word “here” shall, unless the context
dictates otherwise, refer to this entire Agreement and not to any particular paragraph or provision. The
term “person” and words importing persons as used in this Agreement shall include firms, associations,
partnerships (including limited partnerships), limited liability companies, joint ventures, trusts,
corporations and other legal entities, including public or governmental bodies, agencies or
instrumentalities, as well as natural persons.
24.5 Unless the context clearly indicates otherwise, as used in this Agreement, the term “ Licensee”
means the party or parties named on the first page hereof or any of t hem. The obligations of Licensee
hereunder shall be joint and several. If any Licensee, or any signatory who signs on behalf of any
Licensee, is a corporation, partnership, limited liability company, trust, or other legal entity, Licensee and
any such signatory, and the person or persons signing f or Licensee, represent and warrant to Owner that
this instrument is executed by Licensee’s duly authorized representatives.
IN WITNESS WHEREOF, the City of Westminster and Spectrum Southeast, LLC by their duly
authorized representatives have executed this Pole Attachment License Agreement as of the day and year
first written above.
-14-
CITY OF WESTMINSTER
Signature: ________________________________
Name: ___________________________________
Title: __________________________________
Date: __________________________________
SPECTRUM SOUTHEAST, LLC
By: Charter Communications, Inc., its Manager
Signature: _________________________________
Name: ___________________________________
Title: ___________________________________
Date: ___________________________________
-15-
EXHIBITS
-1-
EXHIBIT A
Attachment Fee
Licensee shall pay an initial annual Attachment Fee per pole to which Licensee has an attachment in the
amount of $21.00, which amount shall be subject to escalation year over year pursuant to Section 4.2 of
the Agreement.
-1-
EXHIBIT B
Permit Application
Licensee ________________
Location/Exchange ___________________________ Date ___________________, 20___.
Westminster, South Carolina ______________
In accordance with the terms and conditions of the Pole Attachment License Agreement between the City
of Westminster (Owner) and Spectrum Southeast, LLC (Licensee) application is hereby made for
placement of Attachments on Poles as indicated below and on the attached drawing and/or map. I hereby
certify that, upon final inspection of completed work, all Attachments fully comply with the National
Electrical Safety Code (NESC), edition in effect at the time of attachment and no Attachments will be in
violation of NESC as the result of said Attachments.
Licensee: __________________________________ Number of Poles added ____________
By: _______________________________________ removed____________
Title: _____________________________________ modified____________
Phone: ____________________________________
Email: _____________________________________
Engineer Contact name: _________________________________
Phone: ________________________________________________
Email: ________________________________________________
Owner (conditionally approves) (denies) Licensee’s Permit Application to place Attachments on Owner’s
Poles.
Owner: _________________________________
By: ______________________________________
Title: _____________________________________
Phone: ___________________________________
Email:____________________________________
Date: ____________________________________
Construction Completion Notification
All construction work has been completed and Attachments are ready for post-construction inspection.
Licensee: _________________________________
Name: ___________________________________
Title: ____________________________________
Phone: ___________________________________
Email: ___________________________________
Date: ____________________________________
Post-construction inspection has been completed and the status of this Permit Application is hereby
changed from conditionally approved to approved.
Owner: __________________________________
Name: ___________________________________
Title: ____________________________________Phone:_________________________
Date: ____________________________________
-2-
Pole Number Comments Added Removed Overlash
ORDINANCE NO. 2022-10-11-03
AN ORDINANCE DELETING CERTAIN PROVISIONS OF TITLE III,
CHAPTER 3 5 OF THE CITY OF WESTMINSTER CODE OF
ORDINANCES PERTAINING TO ITS PURCHASING AND
CONTRACTING POLICY; ADDING TITLE III, CHAPTER 38 TITLED
“PROCUREMENT”; AND OTHER MATTERS RELATED THERETO.
WHEREAS, the City of Westminster , South Carolina (the “City”) intends to amend and
restate its Purchasing and Contracting Policy (the “Purchasing Policy”) regarding the procurement
of goods, services and facilities required by the City.
WHEREAS, the Purchasing Policy shall replace the prior policy located in Title III,
Chapter 35 of the City’s Code of Ordinances (“City Code”) at Sections 35.20 through 35.35 (“Prior
Policy”). The Prior Policy shall be deleted, and the Purchasing Po licy shall be added to Title III
and titled Chapter 38 “Procurement”.
WHEREAS, the provisions of S.C. Code Ann. Section 11-35-5320, require that the City ,
as a political subdivision of the State of South Carolina, adopt “procedures embodying sound
principles of appropriately competitive procurement,” suitable for the unique needs of the City.
WHEREAS, the Purchasing Policy is intended to guide City employees and the public in
the process and procedures for procuring goods and services required by the City and its various
departments; and
WHEREAS, the Purchasing Policy will help ensure the fair and equitable treatment of all
persons who desire to do busine ss with the City by selling its goods or services, and will help
maximize the purchasing value of public funds and provide safeguards for maintaining a
purchasing system of quality and integrity.
NOW, THEREFORE, BE IT ORDAINED by the City Council of the C ity of
Westminster, the governing body of the City, as set forth below:
SECTION 1
The City formally enacts the Purchasing Policy, a copy of which is attached hereto as
Exhibit A. The provisions of the Purchasing Policy as provided at Exhibit A, shall be implemented
in their entirety and shall be codified in the City’s code or ordinances, and filed with the City ’s
other formal policies and procedures. The Purchasing Policy shall be effective as of the date of
enactment of this Ordinance.
SECTION 2
All ordinances and other provisions in conflict with this resolution are hereby repealed in
their entirety, explicitly including the Prior Policy. To the extent the changes, modifications or
restatements herein create or result in any inconsistencies in the st ructure or application of the
Purchasing Policy, such inconsistencies shall be revised and corrected in the Purchasing Policy
and its provisions shall control.
DONE AND ENACTED IN COUNCIL ASSEMBLED, this ______ day of
________________, 2022.
CITY OF WESTMINSTER,
SOUTH CAROLINA
[SEAL]
Brian Ramey, Mayor
ATTEST:
Clerk to City Council
First Reading:
Second Reading:
Exhibit A
Purchasing and Contracting Policy
- 1 -
Purchasing
Purchasing and Contracting Policy
Effective: ______, 2022
CHAPTER 38 - Procurement
Introduction
Sec. 38.01 - General
This Purchasing and Contracting Policy (this “Purchasing Policy”) of the City of Westminster ,
South Carolina (the “City”) is designed to describe and explain the responsibilities for the
administration of the City’s purchasing and contracting program. This Purchasing Policy
describes the procedures to be utilized in the daily administration and management of the
procurement function.
It is the goal of the City to provide for the fair and equitable treatment of all parties involved in
public purchasing for the City, to maximize the purchasing value of public funds in procurement,
and to provide safeguards for maintaining a procurement system of quality and integrity for the
City. The City does not discriminate against any vendor on the basis of race, color, religion,
national origin, gender, age, disability, or veteran status in any area of the purchasing process.
This Purchasing Policy is subject to periodic revision as an administrative policy, subject to the
final approval of the City Council. This Purchasing Policy shall be codified at Chapter 38 of the
City’s code of ordinances.
Responsibilities of Purchasing Director
Sec. 38.02 – Purchasing Director
1. The City Administrator shall serve as the Procurement Director.
2. The Procurement Director shall generally be responsible for establishing and
administering this Purchasing Policy, which includes: initiating reports necessary to permit
analysis of purchasing performance; negotiating and recommending contracts; consolidating
purchases of like or common items; and analyzing prices paid for materials, equipment, and
services.
3. The Procurement Director shall serve all departments and divisions, except for the
acquisition of materials for use by the Utilities Department, the Procurement Director may
delegate such procurement to the Utilities Department Warehouse Supervisor.
- 2 -
Sec. 38.03 – Objectives
The primary objectives of this Purchasing Policy are to: (a) procure for the City the highest quality
supplies, equipment, and/or services for the least possible cost; (b) promote an understanding of
efficient and sound purchasing throughout all departments and divisions of the City; (c) determine
the most efficient and economical means of obtaining an item and/or service without sacrificing
the controls and principles of sound purchasing; (d) assist in developing competitive
specifications for use by all departments and divisions; (e) promote competition and endeavor to
obtain full and open competition on purchases, where applicable; (f) maintain forms as necessary
for the successful operation of purchasing needs; (g) exchange ideas and information with other
local government purchasing departments in an effort to solve common purchasing problems; (h)
exercise control over surplus, excess, and junk materials; (i) coordinate with departments and
divisions to maintain inventories at a satisfactory level commensurate with the budget; (j) work
with departments and divisions to promote good will between the City and its vendors; (k) assist
all departments and divisions during budget preparation; (l) comply with all local, state, and
federal laws in the administration of purchasing and contracting functions; (m) ensure an
insurance file is maintained on all City vehicles in compliance with requirements of the City’s
insurance carrier; (n) ensure property insurance files are maintained on all City buildings and
structures in compliance with requirements of the City’s insurance carrier; and (o) coordinate real
estate appraisals as required.
Purchasing In General
Sec. 38.10 – Purchasing Standards
1. All requests for prices and/or services, and all purchases shall be made under the terms of
this Purchasing Policy. In certain instances, authority to request prices and purchase items may
be delegated to others.
2. The Procurement Director shall have full authority to question or inquire as to the quality,
quantity, and type of materials and services requested by any department head or division
manager to ensure that the best interests of the City are served.
3. No person employed by the City, including the Procurement Director, shall receive any
benefit or profit from any contract or purchase made by the City.
4. The Procurement Director shall buy for the needs of the City only.
5. The Procurement Director shall strive to maintain strong and enduring relationships with
vendors of proven ability and with those who have a desire to meet the needs of the City.
Purchasing activities shall be conducted so that vendors will value the City’s business and will
make every effort to furnish the City’s requirements on the basis of quality, service, and pride.
6. The City will buy and/or contract only with those vendors who have adequate financial
strength, high ethical standards, and a record of adhering to specifications, maintaining shipping
promises, maintaining construction, and giving a full measure of service. New vendors will be
- 3 -
given due consideration as multiple sources are necessary to ensure availability of materials
and/or services.
7. The City will strive to avoid unfair practices and give all qualified vendors an equal
opportunity to do businesses with the City.
8. Notwithstanding other provisions of this Purchasing Policy, the Procurement Director or
his or her designee shall act as the City’s representative on all matters pertaining to purchasing
and contracting activities.
9. The Procurement Director shall not knowingly issue a PO (as such term is defined herein)
or execute a contract when there is evidence of a conflict of interest. In instances when a conflict
of interest may exist, but its existence is not clearly established, the Procurement Direct or shall
refer the matter to the City Attorney, whose opinion will be final.
10. Except for emergencies or other authorized exceptions, no procurement or commitment
of monies shall be made by any department, or employee of the City unless monies have been
appropriated and are available in the appropriate account. Monies can be transferred from other
funds with the approval of the City Administrator, or designee.
Sec. 38.11 - Procurement Ethics
1. The following statements are applicable to all City employees who participate in the
procurement process:
(a) City employees shall not obligate the City financially or otherwise by any means,
including but not limited to POs and contracts, when the employee has a personal, material,
financial or other interest in the obligation.
(b) Employees are prohibited from directly or indirectly soliciting or accepting any
rebate, kickback, gift, gratuity, or favor for personal gain from any individual, corporation,
organization, or group. Doing so may lead to disciplinary action, up to termination of
employment.
(c) City employees shall not accept any form of gratuities, with the exception of
non-consumable marketing or promotional mementos valued at $25 or less, which may be
accepted but shared with all City employees (i.e., pens, paper clip holders, pencils, cups, etc.).
Accepting any other such form of gratuities, may lead to disciplinary action, up to termination
of employment.
2. Every contract or duty imposes an obligation of good faith in the negotiation,
performance or enforcement by City staff. Good faith means honesty in fact in the conduct or
transaction concerned and the observance of reasonable commercial standards of fair dealing.
- 4 -
Purchasing/Contracting Procedures
Sec. 38.20 – Procurement Thresholds
1. $1 to $9,999 – Delegated Authority
Competitive bidding is not required within the threshold captioned above . At the
department head’s discretion, a PO will be issued to the vendor recommended by the requesting
department. The department manager, or his respective designees, must approve the purchase
requisition in writing or through required financial software that authorizes the purchase. Each
department should exercise good judgement when making purchases within this threshold. Each
department manager, or designee, shall ensure funds are budgeted sufficient for the purchase.
However, for any purchase in the range of $5,000 - $9,999, the Procurement Director (or her or
his respective designee) must approve such purchase in writing or through required financial
software before the purchase is made.
2. $10,000 to $24,999 – Written Quotations
Competitive pricing is required within the threshold captioned above . Departments shall
request written quotations from vendors in order to obtain competitive pricing. At minimum, two
written quotes shall be solicited. Quotes received via fax or electronic mail shall be sufficient for
purposes of establishing the writing requirement. If two quotes cannot be solicited, please see
Sec. 38.26 below. Absent unique circumstances, the award will be made to the lowest responsible
quote. The Procurement Director (or her or his respective designee) must approve of any purchase
within this range in writing or through required financial software before the purchase is made.
3. $25,000 to $99,999 – Informal Solicitations for Bids or Proposals
(a) Within the threshold captioned above, the City, acting through the Procurement
Director, shall issue a written Invitation for Bids (IFB), a Request for Proposal s (RFP), or a
Request for Qualifications (RFQ), depending on the type of procurement. Typically, commodity
items are procured using a bid process where an award is made t o the lowest responsive and
responsible bidder. However, in some instances a RFP may be used.
(b) In the case of an IFB, three written bids, at minimum, should be solicited. If three
bids cannot be solicited, please see Sec. 38.26 below. Quotes received via fax or electronic mail
shall be sufficient for purposes of establishing the writing requirement. Award shall be made to
the lowest responsive and responsible bidder. For normal competitive purchases, the Procurement
Director (or her or his respective designee) shall approve any such purchase in writing or through
required financial software before the purchase is made.
(c) In the case of RFP/RFQ, award is made in accordance with the evaluation criteria,
terms and conditions stated therein. Purchases, inclusive of grants, those with Federal funds, or
those requiring contracts shall be referred to the Procurement Director for processing. For normal
competitive purchases, the Procurement Director (or her or his respective designee) shall approve
the purchase in writing or through required financial software before the purchase is made.
- 5 -
4. $100,000 and greater – Formal Bids or RFQ/RFPs
(a) Except as otherwise provided herein, competitive, sealed bidding is required for
all purchases of $100,000 or more and the Procurement Director.
(b) Competitive bidding shall be implemented under the procedures set forth in Sec.
38.23 below.
(c) Procurements involving construction may use an alternative delivery method
described in Sec. 38.26(3), which the City Administrator determines is most advantageous to the
City and will result in the most timely, acceptable quality, economical, and successful completion
of the construction project.
(d) It is anticipated that a contract or an agreement shall be executed and delivered by
the City for all purchases in excess of $100,000. All contracts or agreements for purchases in
excess of $100,000 shall be reviewed by the City Attorney and approved by the City Council.
5. To the extent any items in this Sec. 38.20(3) or (4) above have not been authorized in the
City’s approved budget ordinance, or such items exceed 25% of the amount budgeted for such
item, such purchase shall additionally be approved by the City Council.
Sec. 38.21 - Sole Source Procurement
1. Sole source procurement is acceptable when, after a good faith review of all possible
sources, it is determined there is only one viable source for material, supply, or service. To be a
sole source, a vendor shall: (a) have the ability to deliver a unique material or service; (b) have
technical expertise or qualifications; (c) have software license; (d) have the ability to deliver at a
particular time; or (e) have the ability to fulfill the needs for a special purpose or situation from a
qualified provider.
2. Sole source requests should not be made unless the department is confident the request
(a) is reasonable, (b) appropriately justified to meet the City’s requirements, and (c) can withstand
a possible audit. Sole source minimizes or eliminates competition and should be prudently used.
3. (a) The department head (or designee) may use “delegated authority” practices for
sole-source purchases $9,999 and under. All sole-source purchases in the range of $5,000 to
$9,999 shall be approved in writing or through required financial software by the Procurement
Director before the purchase is made.
(b) For sole source purchases $10,000 to $24,999, the Procurement Director must
approve the written sole source justification before the purchase may be made.
(c) For sole source purchases in excess of $ 25,000, any sole source procurement
authorization must be formally approved by the City Council.
- 6 -
Sec. 38.22 – Local Vendor Preference
1. To qualify for a local vendor preference the following requirements must be certified by
the vendor:
(a) The vendor must maintain an office within the legally defined boundaries of the
City, the County of Oconee, the County of Anderson, the County of Pickens , the County of
Greenville, the County of Abbeville, the County of Laurens, the County of Spartanburg, or the
State of South Carolina;
(b) The vendor must have a majority of full -time employees, chief officers and
managers regularly conducting work and business from the office listed in subsection (1)(a)
above. If located in the City, the vendor must have held a valid city business license for a
consecutive period of at least two years prior to the date of the application for certification. If
not located in the City, the vendor must have maintained the eli gible office for at least three
consecutive years in addition to the qualifications under subsection (1)(a) above; and
(c) The vendor must submit a local preference certified application in a format and
manner determined by the Procurement Director .
2. Use of the local vendor preferences during the bid evaluation process:
(a) For comparing bids, a vendor who meets certification criteria established in
subsection (1) above and is otherwise a qualified vendor shall qualify for local vendor
preference based on the location of the eligible office as follows:
(i) Eligible office located within the City limits will be entitled to a bid price
reduction of seven percent, not to exceed a maximum of $10,000.00.
(ii) Eligible office located within the County of Oconee (but not within the
City limits) will be entitled to a bid price reduction of five percent, not to exceed a
maximum reduction of $8,000.00.
(iii) Eligible office located in the County of Anderson, the County of Pickens ,
the County of Greenville, the County of Abbeville, the County of Laurens, or the County
of Spartanburg will be entitled to a bid price reduction by three percent, not to exceed a
maximum reduction of $4,000.00.
(iv) Eligible office located in the State of South Carolina that does not qualify
for one of the higher percentage preferences will be entitled to a bid price reduction of
two percent, not to exceed a maximum reduction of $2,500.00.
(b) A vendor may claim only one preference based upon the location of the eligible
office.
(c) A vendor with no eligible office may claim a local vendor preference in instances
where subcontractors are proposed that would be eligible under subsection (1) above. In order
- 7 -
to claim a preference based upon eligible subcontractors, the proposer must c ertify the value of
the subcontractor award compared to the total contract amount. The subcontractor must submit
a certified application as required in subsection (1)(c) and be fully qualified under the provisions
of this section. The preference will be the product of the percentage of the contract price
certified to eligible subcontractors applied to the preference percentage for which the
subcontractors would be eligible.
(d) A subcontractor preference may not exceed the dollar limits imposed in
subsection (2)(a) based upon the eligible offices of the respective subcontractors.
(e) The final contract price will reflect the original bid amount before the local
vendor preference was applied.
3. All requests for qualifications for professional services shall be excluded from the local
vendor preference.
4. The Procurement Director shall maintain a registry of eligible vendors/contractors.
Inclusion on the registry will be limited to those having submitted a request for inclusion and
certified eligibilit y based upon the criteria established in subsection (2).
5. In instances where a contract price is anticipated to exceed $100,000.00, and the use of
subcontractors is reasonably anticipated, the Procurement Director shall require documentation
by proposers of attempts to include local vendors/contractors. At minimum, the documentation
shall substantiate attempts to include subcontractors eligible for a preference of three percent
or greater to equal a goal amount of 15 percent or more of the proposed contract price. A
proposer should provide an explanation of reasons that the local preference goals were not
achieved. Documentary requirements shall be included in the bid specifications and only apply
when the requirements are so documented. There shall be no penalty for failure to meet the 15
percent goal. However, failure to include required documentation shall be considered an
informality in the bid.
6. The Procurement Director shall establish procedures to promote the various local vendor
preferences and to provide notice in bid solicitations of the availability of the preferences. If a
local vendor preference is not recited in a bid solicitation, it shall not be applicable to such
bidding.
Sec. 38.23 – Competitive Bidding
1. Competitive Sealed Bids . Under this method, the City issues an IFB, and prospective
bidders must submit bids in accordance with the bid invitation. The City shall select the bid from
the responsible and responsive bidder who submits the lowes t price and meets all of the
requirements included in the bid invitation.
2. Competitive Sealed Proposals. Under this method, the City issues a RFP or RFQ, which
contains a description of the project and the factors that will be used to evaluate submitte d
proposals. The RFP or RFQ may or may not require a final price or fee to be included with the
proposal. Price may be one of the factors considered by the City when making its final decision,
- 8 -
but it will not be the only factor. All submitted proposals are evaluated in accordance with the
criteria provided in the RFP or RFQ and the City must make its final selection based on such
criteria.
3. Minority and Women Owned Businesses . The City is determined to provide minorities
and women equal opportunity for participating in all aspects of the City's contracting and
procurement activities, including, but not limited to, employment, construction projects, and
lease agreements consistent with the laws of the State of South Carolina.
4. Plans and Specifications
(a) For construction projects, the City’s Procurement Director or a third -party
engineering firm, in concert with the affected department head , shall generate plans and create
specifications. The date set for the bid opening must allow ample time for prospective bidders to
prepare their bid. Public bid notices may be run in one or more newspapers of general circulation
or trade journals as the Pr ocurement Director deems necessary. The formal bid may also appear
on the City’s website and available trade journals. The Procurement Director or department head,
acting on the advice of the City’s engineer or other consultants, as necessary, will determine what
construction trades will be involved on the project (e.g., subcontractors, drywall, electrical,
fencing, grading, excavating/clearing, landscaping, masonry, painting, plumbing, etc.).
(b) The City should be able to evaluate bids solely using the information as supplied
by the offeror’s bid. However, it is sometimes determined that, for clarification and more
professional evaluation, additional information is desirable and often necessary. Therefore, as
provided in the IFB, RFP or RFQ, the City may reserve the right to hold discussions, review the
specifications as believed offered, and request clarification or any additional technical
information which may provide a fair and impartial evaluation by the City. All discussion shall
be limited to the o fferor’s products, goods or services, and no discussion shall be permitted
regarding offers by others.
(c) As may be provided in the IFB, RFP or RFQ, prior to any negotiations, discussion
may be conducted with any offerors submitting a proposal, which appears to be eligible for
contract award pursuant to the selection criteria as set forth in the respective solicitation for bids.
All such discussions shall be of the nature of clarification of offeror’s understanding of
specifications, scope of work, goods or services, offeror’s qualifications, availability of qualified
personnel, proven experience, including referenced clients and the financial stability and
responsibility of the offeror. In conducting any such discussions, there must be no disclosure of
any information derived from proposals submitted by other competing offerors.
(d) Bids received late will not be accepted or considered for the award. Bids are
opened publicly at a specific date and time. A bid tabulation shall be produced and made available
to all interested bidders. No bid will be awarded until the Procurement Director, department head,
and engineer have reviewed each bid. Any bids in excess of $100,000 shall be submitted to City
Council for final approval.
(e) In the event the Procurement Director or department head desire to award the
contract to an offeror other than the lowest bidder, such party (upon the advice of a third- party
- 9 -
engineer or other consultant) shall submit a written request to City Council detailing reasons for
the request. The request must be approved by City Council, before the contract can be awarded
to a contractor other than the one determined to be the lowest responsible and responsive bidder.
(f) Upon proper authorization from the City Council, the agre ements/contracts shall
be negotiated and thereafter the purchasing agent will generate an “authorization-to-proceed” for
the contractor.
5. Bid Security – Construction Projects
The City may, at its discretion, require bid security deposits as stated in the invitation for
bids on any projects. Construction projects valued at $100,000 and over will be required to hold
bid securities. These deposits may take the form of a certified check, a cashier’s check or bond
executed by a surety company licensed under the laws of South Carolina to execute such bonds.
Unless otherwise informed by one of the City’s consultants to provide a higher percentage, t he
bid security shall be in an amount equal to at least 5% of the amount of the bid. When the
invitation for bids requires security, noncompliance requires that the bid be rejected. Bid deposits
will be returned to the unsuccessful bidders after an award determination has been made. In the
event the successful bidder shall fail to enter into a contract within the terms of the invitation after
having been notified of the award, the bid security deposit shall, at the option of the City, be
forfeited to the City and retained and deposited to the City’s account. In such an instance, the City
may renegotiate with the second lowest, responsive and responsible bidder, or resolicit new bids;
whichever is determined in the best interest of the City.
6. Performance Bonds
(a) When construction contracts are awarded, labor, material, and performance
payment bonds may be required at the option of the City and in all cases where the contract price
exceeds the sum of $50,000. These bonds, in such instances, shall be written by an acceptable
surety company licensed in South Carolina and meet the requirements for issuing such bonds in
accordance with South Carolina law.
(b) Bonds shall guarantee the performance by the bidder. The successful bidder shall
provide bonds in accordance with the contract in an amount equal to or greater than 100% for
contracts of $50,000 or greater or such threshold as may be required by South Carolina law . All
contract bonds shall be for a period of not less than one year from the date of the final payment.
(c) The City reserves the right to request bonds for projects under $50,000, if it is in
the best int erest of the City to do so. Such requirement will be reflected within the bidding
documents.
(d) In lieu of corporate surety, material, labor, and performance payment bonds, the
successful bidder may request to post certified funds with the City in such a mounts as may be
agreed upon by the Procurement Director and which funds shall be held in accordance with the
terms as agreed upon between the City and the successful bidder. Prior to approval of such request
for bond alternate, a determination in writing must be made as to why the request should be
- 10 -
granted, the overall project risk and the responsibility of the offeror which has requested such an
alternate, or any other factors which may weigh heavily on granting such an approval.
(e) Every person who has furnished labor or material to the contractor or its
subcontracts for the work specified in the contract, in respect of which a payment bond is
furnished under this section, and who has not been paid in full before the expiration of a period
of 90 days after the day on which the last of the labor was performed by such person or material
was furnished or supplied by such person for which such claim is made, shall have the right to
sue on the payment bond for the amount, or the balance thereof, unpaid at the time of institution
of such suit, and to prosecute such action for the sum or sums justly due such person. Any person
having a direct contractual relationship with a subcontractor of the contractor, but no contractual
relationship expressed or implied with the contractor furnishing such payment bond, shall have a
right of action on the payment bond, upon giving written notice to the contractor within 90 days
from the date on which such person did or performed the last of the labor or furnished or supplied
the last of the material upon which such claim is made, stating with substantial accuracy the
amount claimed and the name of the party to whom the material was furnished or supplied or for
whom the labor was done or performed. Such written notice to the contractor shall be personally
served or served by mailing the same by registered or certified mail, postage prepaid, in an
envelope addressed to the contractor at any place the contractor maintains an office or conducts
its business.
(f) Every suit instituted upon a payment bond shall be brought in a court of competent
jurisdiction for the county or circuit in which the construction contract was to be performed, but
no such suit shall be commenced after the expiration of one year after the day on which the last
of the labor was performed or material was supplied by the person bringing suit. The obligee
named in the bond need not be joined as a party in any such suit.
7. Retention
Contracts that provide for installment progress payments that are based upon an estimated
percentage of completion, with a percentage of the contract’s proceeds to be retained by the City
pending completion of the contract, the retained amount of each progress payment or installment
shall be as agreed-upon by negotiation, but not less than 5%. When the work to be performed on
a City project is by multiple prime contractors or by a prime contractor and multiple
subcontractors, the work contracted to be done by each individual contractor or subcontractor
may be considered a separate division of the contract for the purpose of retention. As each such
division of the contract is certified as having been completed, that portion of the retained funds
which is allocable to the completed division of the contract may be released forthwith to the prime
contractor, who shall, within ten days of its receipt, release to the subcontractor responsible for
the completed work the full amount of any retention previously withheld by the prime contractor.
8. Licensing
All contractors and vendors must have the applicable licenses according to the
requirements of the South Carolina Department of Labor, Licensing, and Regulation before being
awarded a contract or other work by the City.
- 11 -
Sec. 38.24 – Tie Bids
If all bids received are for the same total amount or unit price - quality and service being
equal - the contract shall be awarded according to local vendor preference. In the event that local
vendor preference still has bids at the same total amount, the contract shall be awarded o n the
basis of a coin flip.
Sec. 38.25 - Purchase Orders; Change Orders
1. A purchase order (“PO”) authorizes the vendor to deliver materials or supplies in
accordance with the terms and conditions specified thereon (or incorporated from a bid or other
document by reference). It also acknowledges the obligation of the City to pay for goods or
services ordered, upon the receipt and proper invoice. Unless a separate contract document is
executed, the PO establishes the contractual relationship between the City and the vendor.
2. A PO is a legally binding contract. The PO is the City’s commitment for the value of the
material or service ordered.
3. One-time POs are generally issued for a finite quantity of products, construction, or
services. Once a PO has been issued, the City’s accounting system will automatically encumber,
or set aside, the monies from the department’s budget. This allows the department to more closely
monitor their budget. Once the goods or service ha ve been received, and the invoice ha s been
received and approved, payment may be applied.
4. A blanket PO may be used for purchases that are made on an “as -needed” basis. Only
items, or services, that are described on the blanket PO may be purchased. Control of the use of
the blanket PO is the responsibility of the Procurement Director (or her or his designee). A blanket
PO allows departments to order as -needed items throughout the fiscal year without having to
request a new PO for each purchase as well as the ability to qualify for lower, consolidated pricing.
Any authorized City employee may issue a release for specific goods described by the blanket
PO pursuant to its terms and conditions.
5. Because the contract or PO is a legal document that represents, or forms the basis of, the
contractual relationship between the City and a vendor, any changes to that contract must be in
writing, and approved by the department head and Procurement Director . When changes orders
are needed, they must be approved in the same sequence as the initial PO up to and including
necessary approvals. Any payments to the vendor will be delayed while proper documentation is
completed. Furthermore, the contractual rights of the City and the vendor are jeopardized by such
unauthorized changes.
Sec. 38.26 - Exceptions to Bidding
1. Critical/Emergency Procurement
The Procurement Director , or designee, may make or authorize procurements that in
nature are critical to the City, and time does not permit for solicitation or re-solicitation, and that
the procurement may be accomplished in such a method that provides the City’s best interest be
- 12 -
served. The Procurement Director, or designee, may make or authorize others to make, critical
procurements when in nature, it is critical to the City and time does not permit for solicitation or
re-solicitation and that the method provides that the City’s best interest is served. In such cases,
the department head must coordinate the procurement with the Procurement Director and receive
written approval.
2. Certain Construction Projects – Generally
(a) Generally. When negotiating construction projects, the City understands and
recognizes that competitive bidding may not be the best project delivery method. As a result, the
Procurement Director, in consultation with qualified consultants , is authorized to determine the
project delivery method dee med most advantageous to the City, which is the method which is
intended to result in the most timely, economical, and successful completion of the construction
project. The Procurement Director will have the final approval for the selection of the project
delivery method.
(b) Alternative Methods. The following project delivery methods are authorized for
procurements relating to construction of any public infrastruct ure facility: (i) Design -Build; (ii)
Design-Bid-Build; (iii) Operation and Mainten ance; (iv) Design -Build-Operate-Maintain; (v)
Design-Build-Finance-Operate-Maintain; (vi) Construction Management At -Risk; (vii)
Construction Management Services; and (viii) Other Special Project Delivery Methods permitted
by the State of South Carolina.
3. Alternative Methods – Construction Projects
(a) Design-Build is a project delivery method in which the City enters into a single
contract for design and construction of a construction project. Procurement of Design -Build
services is appropriate when the City does not have the in-house capability to design and supervise
the project, and when compliance with technical regulations and best practices for construction is
critical. With the assistance of experts, the City may develop performance specifications for the
desired infrastructure which can then be used to develop design requirements for submission to
Design-Build firms for development. The Design-Build services may be awarded to either (a) the
responsive, responsible bidder where price is a factor, or (b) the responsible contractor (selected
from a group of pre-approved contractors) who is the low bidder. Errors and omissions insurance
is required to cover the architectural and engineering services provided by the offeror.
(b) Design-Bid-Build is a project delivery method in which the City sequentially
awards separate contracts, the first for Architectural and Engineering Services to design the
project and the second, based on competitive bidding by the City, for construction of the project
according to the final design. This is the traditional method of designing and constructing
facilities. The procurement of Construction Management Services (see subsection 3(g)
hereinbelow) for such a project would make this method a specialized method of procurement.
(c) Operation and Maintenance is a project delivery method whereby the City enters
into a single contract for the routine operation, routine repair, and routine maintena nce of an
existing, or to -be-constructed, project. Operation and Maintenance services shall be procured
from prequalified contractors by utilizing competitive sealed proposals submitted in response to
- 13 -
a RFP, which has established the supplies and services required to maintain and operate
infrastructure facilities.
(d) Design-Build-Operate-Maintain is a project delivery method in which the City
enters into a single contract for design, construction, operation and maintenance of a project over
a contractually-defined period. Ownership of the facility may be in the name of the City or leased
by the City from a non- profit corporation. All or a portion of the funds required to pay for the
services provided by the contractor during the contract period are either appropriated by the City
prior to award of the contract or secured by the City through fee or user charges or other sources
of revenue. The City should not participate in financing any such project without an opinion from
bond counsel or tax counsel. Errors and Omissions insurance is required to cover the architectural
and engineering services provided by the offeror.
(e) Design-Build-Finance-Operate-Maintain is a project delivery method in which the
City enters into a single contract for design, construction, finance, operation and maintenance of
an project over a contractually defined period. No funds are appropriated to pay for any part of
the services provided by the contractor during the contract period. Procurement of Design-Build-
Finance-Operate-Maintain services shall generally follow procedures outlined above for Design-
Build projects with the additional elements of financing and operation incorporated into the
project. A preliminary determination by the City should have been made that project re venues
would be sufficient, over the length of the proposed contract, to cover design, construction,
finance, and operations, and that the traditional Design -Bid-Build approach is inappropriate or
impracticable for this project. The City should not participate in financing any such project
without an opinion from bond counsel or tax counsel. Errors and Omissions insurance is required
to cover the architectural and engineering services provided by the offeror.
(f) Construction Management At-R isk is a project delivery method in which the City
awards separate contracts, one for architectural and engineering services to design a project and
the second to a construction manager at -risk for both preconstruction and construction of the
project according to the design specifications of the architect or engineer. The contract with the
construction manager at -risk may be awarded before completion of design. The construction
manager at-risk shall assume the risk for construction, rehabilitation, alteration or repair of the
project at a fixed or guaranteed maximum price.
(g) Construction Management Services is a project delivery process by which a
qualified third-party provides construction leadership with a defined scope throughout various
phases of the project (e.g. planning, design and construction). Construction Management Services
are typically procured using competitive sealed bidding or competitive sealed proposals and bids
may be awarded to either (a) the responsive, responsible bidder where price is a factor, or (b) the
responsible contractor (selected from a group of pre-approved contractors) who is the low bidder.
Construction Management Services, specifically including a construction manager at -risk, may
be procured for any of the alternative delivery methods authorized herein. Errors and Omissions
insurance may be required to cover any architectu ral and engineering services provided by the
offeror.
(h) Other Special Project Delivery Methods or combinations of the above may be
utilized provided that the City can demonstrate that the delivery methods meet the intent of this
- 14 -
Purchasing Policy and re ceives the approval of the Procurement Director . Insurance of various
types may be required as additional security for the City for the particular method of project
delivery.
4. Subject to the review and approval of the Procurement Director (or her or his delegate),
purchases of gasoline, diesel fuel, alcohol fuel, propane, motor oil or fuel oil may be made using
“delegated authority”, regardless of the size of the purchase.
5. Due to the City's dependence on and its need for continuous operation of its vehicle
fleet, special p rovisions for securing supplies, parts and maintenance for use by City vehicles
must be made. Each department head, subject to the review and approval of the Procurement
Director (or her or his designee) is authorized to use whateve r resources may be available to
maintain the C ity's vehicular fleet, provided approval of the Procurement Director is obtained
in writing or through required financial software.
Sec. 38.27 – Exempt Services
The following professions are exempt from competitive bidding requirements, although
competitive bidding may be used when in the best interest of the City: professional services where
the person employed is customarily employed on a fee basis rather than by competitive bidding.
Examples would include, information technology providers, appraiser, architects, engineers,
auditor, lawyers (and all legal services), physician, insurance, land -surveying, banking, certain
consulting services and other professional services.
Procurement Administration
Sec. 38.30 – Business License Requirement
It is required that each vendor, contractor, or subcontractor awarded a contract with the
City either have a current business license or secure a business license for the contract amount of
work to be performed for the City within the City limits. A copy of the business license must be
submitted prior to execution of contract. No work shall be done by the contractor until a valid
business license has been obtained.
Sec. 38.31 – Cooperative Contracts
1. The State of Sou th Carolina enters into a variety of contracts with manufacturers and/or
dealers utilized by the state and local governments at all levels. The Procurement Director may
procure without competitive bids equipment, supplies, or services which are under curr ent state
contract. These commodities may include, but are not limited to, vehicles, tractors, backhoes,
radar units, janitorial supplies, office supplies, traffic control equipment, and fuel.
2. General Services Administration (GSA) contract holders make their products available to
state and local governments for the same prices charged to federal government agencies.
Purchasing may procure without competitive bids, equipment or supplies under contract with
GSA, also referred to as Federal Supply Schedules.
- 15 -
3. Various support agencies and organizations, including but not limited to, the Municipal
Association of South Carolina, the National League of Cities, the International City/County
Managers Association, the National Association of Counties, and Public Technology, Inc., have
made available to local governments cooperative procurement programs. The programs are
generally the result of a thorough competitive bidding process at the state or national level which
fully satisfies the City’s procurement requirements . The Procurement Director may utilize such
cooperative procurement programs as needed.
Sec. 38.32 – Taxes
The City is exempt from Federal Excise Tax. The City’s Tax Exemption Registry Number
is available upon request. The City pays South Carolina state sales taxes on all applicable
purchases.
Sec. 38.33 – Surplus Property
1. Surplus personal property means property which: (a) has reached or is rapidly approaching
an expiration date or the end of its useful life; (b) is worn-out or otherwise no longer useful to the
organization for its intended purposes; (c) is obsolete; or (d) too costly to maintain or operate.
2. Items which have little or no salvage value, considering the cost of disposing of same,
such as older model computers and printers, may be offered to employees at nominal prices, as
established by the Procurement Director, before other means of disposition are considered.
3. Items with salvage value, but which are likely to bring little at a conventional auction,
may be sold through an internet site such as www.govdeals.com or any other reputable internet
site or auction service which the Procurement Director has determined will offer the most
exposure to potential interested buyers, or which will likely result in the highest return for th e
City.
4. Surplus personal property with trade-in value may also be traded-in to a dealer or vendor
in exchange for, or toward the purchase of, items needed by the City.
5. Surplus personal property may also be sold to, traded with, or donated to other
governmental entities, if such is found to be in the best interests of the City.
6. Following review, the Procurement Director may request authorization from City Council
to sell those real properties owned by the City under the terms and conditions approved by the
City Council in accordance with the laws of the State of South Carolina.
Sec. 38.34 – Insurance
1. Except as may be waived in the discretion of the Procurement Director, all contracts
awarded by the City shall require that the vendor or contractor agree to hold harmless, indemnify
and defend the City, its agents and employees, from any claims for property damage or personal
injury (including death resulting therefrom). S uch claims shall include, but are not limited to,
actual, consequential, incidental or punitive damages. The vendor or contractor shall agree to
- 16 -
maintain sufficient comprehensive general liability insurance, naming the City as additional
insured, in the amounts of $1,000,000.00 per occurrence and $1,000,000.00 per person. Proof of
such insurance shall be given to the Procurement Director by an appropriate certificate- of-
insurance issued by the contractor’s insurance agent.
2. Further, the vendor or contractor shall ensure prior to commencement of work, that all
subcontractors, agents, assigns or employees of the vendor or contractor and subcontractors shall
agree to hold harmless, indemnify and defend the City, its agents and employees from any claims
for property damage or personal injury (including death resulting therefrom). Such claims include
but are not limited to, actual, consequential, incidental or punitive damages. Further, prior to
commencement of work, the vendor contractor shall ensure that all subcontractors, agents or
assigns of the contractor, maintain sufficient comprehensive general liability insurance, naming
the City, as additional insureds, in the amounts of $1,000,000.00 per occurrence and
$1,000,000.00 per person. Proof of such insurance shall be given to the Procurement Director by
an appropriate certificate-of- insurance issued by applicable entity’s insurance agent and the
appropriate endorsement issued by the insurance carrier.
3. Vehicle liability insu rance with minimum combined single limits of $1,000,000.00 per
occurrence shall also be maintained by the vendor or contractor, with applicable endorsements
establishing the additional-insured status provided to the City.
4. The vendor and/or contractor shall be required to maintain, during the life of any contract
with the City workers’ compensation and employer’s liability insurance for all employees to be
engaged in services on any project in an amount not less than the minimum allowed by South
Carolina law, and in case any such services are sublet, the contractor shall require the
subcontractor(s) similarly to provide workers’ compensation and employer’s liability insurance
for all of the subcontractor’s employees to be engaged in such services.
Specifications
Sec. 38.40 - Purpose
Specifications are intended to assist the City in obtaining the best quality and value for
funds expended. Specifications are not designed to deter, preclude, or prevent competition
through the use of excessive technicalities or details.
Sec. 38.41 – Responsibility for Specifications
1. It shall be the primary responsibility of the requesting department head to furnish proper
specifications. Because the responsibility for procurement rests with the Procurement Director,
the Procurement Director may assist in the development of specifications jointly with the
department heads as needed.
2. Prior to soliciting bids, the specifications furnished by a requesting department may be
modified by the Procurement Director to comply with this Purchasing Policy and to provide for
a level of quality commensurate with the intended use of the needed item. In the event the
Procurement Director deems it necessary to alter the specifications from those originally
- 17 -
submitted, the Procurement Director will inform the requesting department head, describing the
need for alteration to the specifications, and the extent and nature of the changes.
Sec. 38.42 – Types of Specifications
Each purchase, regardless of the dollar amount involved, is based on a specification. There
are six basic types of specifications or methods used to describe what is to be purchased: (1)
Performance: Function and use of the product are the basic definitions; (2) Design: Specific
characteristics of the product and their arrangement are the basic definitions; (3) Approved
Products List: Actual products have been tested or examined and approved prior to soliciting bids;
(4) Questionnaire: The purchaser prepares a product information sheet to accompany the request
for prices. Each bidder must complete and return the questionnaire as a part of the bid; (5) Sample:
The purchaser requires vendors to furnish representative samples of products offered for
comparison and evaluation in determining the successful bidder; and (6) Or Equal: One or more
vendors’ exact products or typical workmanship is identified as the level of quality desired, and
the purchaser reserves the right to approve any other as equal or acceptable.
Sec. 38.43 – Level of Quality
In considering and developing specifications, purchases made from public sources and
administered by public bodies should not be expected to provide for “deluxe” or luxurious levels
of quality. Therefore, it is necessary to follow a general policy with regard to purchasing good,
standard grades of merchandise which represent an optimum relationship between quality and
price consistent with providing a satisfactory level of service.
Sec. 38.44 – Adequate Specifications
1. Adequacy and accuracy of specifications are very important. Specifications should not be
written for the purpose of eliminating competition but should provide sufficient detail for full and
fair competitive bidding.
2. In the manufacture of certain products, there is usually a price range covering similar
products offered by more than one manufacturer representing a level of product quality and
features offered —low, medium , and high. It is important to consider these levels in the
development of specifications. For example, a lower priced, stripped automobile versus a
medium-priced automobile or a higher deluxe model automobile. Each of these models has its
own use and place, but without proper specifications when bid, the wrong automobile could be
acquired for the use intended.
Sec. 38.45 – Change in Specifications
If it is determined, after bids have been opened, that a product with an alternate
satisfactory specification provides for a lower price, all bids may be rejected at the discretion of
the Procurement Director, with concurrence of the department head. The specifications should
then be rewritten to allow all bidders an equal opportunity to submit proposals on an acceptable
alternate.
- 18 -
Sec. 38.46 – Changes in Specifications by Bidder
When a decision has been reached on the specifications, all bids must be based on the
same specifications and no bidder shall have the right to substitute other specifications for those
contained in the bid.
Sec. 38.47 – Changes in Specifications After Bid Sent to Prospective Bidder
Once an Invitation-to-Bid has been sent, no changes in the specifications shall be made
unless all prospective bidders are so notified by means of an addendum clearly noting such
changes. The addendum shall instruct the bidder to acknowledge receipt of the addendum in the
bid proposal.
Inventory Control Procedures
Sec. 38.50 – Maintenance of Fixed Assets Inventory List
1. The City shall maintain an inventory of its fixed assets. The fixed assets list will be
maintained to: (a) s afeguard the City’s capital investment; (b) f ix responsibility for the custody
of equipment; (c) assist in formulation of acquisition and retirement policies through
accumulation of data regarding prices, sources of supply, and useful life; and (d) t o provide data
for financial reports.
2. Fixed ass ets are tangible assets of significant value having a useful life that extends
beyond a reasonable time period as defined by the City. The fixed assets included in the City’s
accounting system are land, buildings, other improvements, infrastructure, and equipment.
Sec. 38.51 – Asset Types
1. Land: Land includes the investment, held fee simple in real estate other than buildings
and/or other improvements. All land, as defined, regardless of value or cost, should be capitalized.
2. Buildings: Buildings include all City -owned buildings except those whose condition
prevent their serving any present or future useful purpose. Permanently installed fixtures to or
within a building, such as boilers, lighting fixtures, and plumbing are considered a part of the
building. The subsequent addition or minor fixtures and/or equipment to a building should be
recorded as equipment. The costs of major improvements to a building, renovation of the building,
etc., should be capitalized and recorded as a part of the building asset value.
3. Other Improvements: Other improvements are physical property of a permanent nature,
including storage tanks, reservoirs, parking areas, park facilities, etc.
4. Infrastructure: Infrastructure assets are long -lived capital assets that n ormally are
stationary in nature and can be preserved for a significantly greater number of years than most
other capital assets. Examples are roads, bridges, water and sewer systems, drainage systems, and
lighting systems.
- 19 -
5. Equipment: Equipment includes movable property of a relatively permanent nature and of
significant value, such as mobile equipment, office equipment, data processing equipment,
machines, tools, and office furniture and fixtures. “Relatively permanent” is defined as a useful
life of one year or longer. “Significant value” is defined as having an original cost of $5,000.00
and over. The City may exercise the option to include other items for the purpose of maintaining
appropriate accounting control. The cost may be applied in some instances to aggregates of units
of similar type or purpose, such as groups of chairs, shelving, filing cabinets, etc., rather than to
the individual unit itself. Exceptions to the $5,000.00 value and the one -year life rule will be
applied consistently.
Sec. 38.52 – Development and Assignment of Fixed Asset Control Numbers
1. Fixed assets shall be categorized into several classification groups based on type and use
of the items. These groups shall be defined and maintained on file in the City Clerk’s office.
2. Fixed assets will be assigned control numbers and will be added to the fixed asset
inventory list immediately following invoice payment to ensure that a current and accurate listing
is maintained. Sequentially numbered fixed asset identification tags w ill be prepared. Following
number assignment, the tag and supporting documentation will be issued to the relevant
department. The department head is responsible for ensuring that the asset tag is physically
attached to the fixed asset.
3. Only equipment i tems will be physically tagged with fixed asset control numbers.
Equipment will be tagged in a manner and location which ensures ease of number identification
and permanence.
Sec. 38.53 – Review of Fixed Asset Listing
On an annual basis, department heads will be issued a copy of the fixed asset listing for
their respective department(s). This asset report should be thoroughly reviewed, noting changes,
additions, or deletions to be made to the inventory system. The inventory system will be revised
based on information received from each department.
Appeals
Sec. 38.60 – Appeals
1. Any actual or prospective vendor, bidder, or contractor who is aggrieved in connection
with the solicitation or award of a contract may formally protest in writing to the Procurement
Director. The protest may be submitted at any time during the bidding process. However, if a
prospective vendor, bidder, or contractor wishes to protest, the formal protest must be submitted
in writing and must be received by the City no later than seven (7) days from the date that the
aggrieved actual or prospective vendor, bidder, or contractor has been informed of the bid results
by the Procurement Director . Protests received by the City following seven (7) days after bid
results have been released by the Procurement Director will not be considered by the City.
- 20 -
2. The Procurement Director shall have the authority to settle and resolve a protest of a
vendor, bidder, or contractor, actual or prospective, concerning the solicitation or award of a
contract.
3. If the protest cannot be mutually resolved, the Procurement Director shall issue a decision
in writing within a period not exceeding ten (10) days following receipt of a formal grievance
notice. The decision shall state the reasons for the action taken. A copy of the decision shall be
mailed to the protesting party and any intervening party immediately.
4. A decision rendered under Sec. 38.60(3) of this Section shall be final and conclusive,
unless any person or party adversely affected by th e decision appeals in writing to the City
Council. The appeal must be submitted and must be received by the City no later than seven (7)
days after the date of notification of a final decision by the Procurement Director . The appeal
must outline the reasons the appellant is adversely affected by a decision and the desired outcome
of the hearing. The request will be heard by Council at the next regularly scheduled City Council
meeting; however, nothing herein shall prohibit the City Council from calling a special meeting
to hear an appeal.
5. Any vendor, bidder, or contractor receiving an adverse decision may appeal such decision
to the Court of Common Pleas, Non- Jury Term, for Oconee County, South Carolina within (10)
ten days of the submission of an adverse decision by the City Council to the aggrieved party.
RESOLUTION NO. 09-13-2022-01
A RESOLUTION PLEDGING TO PRACTICE AND PROMOTE CIVILITY IN THE CITY
OF WESTMINTSER
WHEREAS, the City of Westminster, South Carolina (the “City”) is a legally constituted
municipal corporation incorporated by Act No. 744 of the Acts and Joint Resolutions of the
General Assembly of the State of South Carolina for the year 1875; and
WHEREAS, a recent national survey found that 93% of Americans believe that incivility
is a problem, with 68% considering it a “major” problem a nd 74% believing that incivility is
increasing in America; and
WHEREAS, the City Council of the City of Westminster (the “Council”), the governing
body of the City, recognizes that robust debate and the right to self-expression, as protected by the
First Amendment to the United States Constitution, are fundamental rights and essential
components of democratic self-governance; and
WHEREAS, the Council further recognizes that the public exchange of diverse ideas and
viewpoints is necessary to the health of the community and the quality of governance in the City;
and
WHEREAS, the Members of Council, as elected representatives of the community and
stewards of the public trust, recognize their special role in modeling open, free and vigorous debate
while maintaining the highest standards of civility, honesty and mutual respect; and
WHEREAS, in order to publicly declare its commitment to civil discourse and to express
its concern for the common good and well-being of all of its residents, the Council has determined
to adopt this resolution.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Westminster, the governing body of the City, in a meeting duly assembled:
The City pledges to practice and promote civility within the governing body.
The elected officials of the Council enact this civility pledge to build a stronger and more
prosperous community by advocating for civil engagement, respecting others and their
viewpoints, and finding solutions for the betterment of the City of Westminster.
This pledge ensures all communication — both spoken and written — to be open, honest
and transparent as this is vital for cultivating trust and relationships.
This pledge ensures mutual respect to achieve municipal goals, recognizing tha t patience,
tolerance and civility are imperative to success.
This pledge ensures opportunities for finding common ground and engaging in civil
discussion to seek solutions while actively listening and thoughtfully participating.
DONE AND ADOPTED IN CO UNCIL ASSEMBLED , this 13th day of September
2022.
CITY OF WESTMINSTER, SOUTH CAROLINA
_________________________________________
Brian Ramey, Mayor
[SEAL]
Rebecca Overton, City Clerk
RESOLUTION NO. 09-13-2022-02
A RESOLUTION AUTHORI ZING THE CITY OF WESTMINSTER TO PASS
THROUGH THE FEES FOR CREDIT CARDS, DEBIT CARDS AND ANY OTHER FEE-
BASED FINANCIAL TRANSACTIONS TO THE USER; AND OTHER MATTERS
RELATED THERETO
WHEREAS, the City of Westminster, South Carolina (the “City”) is a legally constituted
municipal corporation incorporated by Act No. 744 of the Acts and Joint Resolutions of the
General Assembly of the State of South Carolina for the year 1875, and maintains a combined
utility system (the “System”); and
WHEREAS, the City offers the ability to pay utility bills, recreation fees, and any other
fees collected by the City with a credit card, debit card or other fee -based financial transactions;
and
WHEREAS, the use of these financial devices are for convenience to the customer and to
the City; and
WHEREAS, the City absorbed the cost of these convenience transactions which have cost
more than $58,000 in the last year; and
WHEREAS, the City cost of the convenience transactions cost all paying customers
regardless of their utilization of the convenience; and
WHEREAS, the City desires to continue the usage of the convenience transactions while
not penalizing those who do not utilize the convenience transactions.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Westminster (the “Council”), the governing body of the City, in a meeting duly assembled:
The cost for credit card, debit cards and any other fee -based financial transactions will be
bore, or passed-through, to the customer utilizing device beginning October 10, 2022 or as soon
thereafter as may be logistically practical.
[Remainder of Page Intentionally Left Blank]
DONE AND ADOPTED IN COUNCIL ASSEMBLED, this 13th day of September
2022.
CITY OF WESTMINSTER, SOUTH CAROLINA
_________________________________________
Brian Ramey, Mayor
[SEAL]
Rebecca Overton, City Clerk
Position 5
RUS BULLETIN 1780-27 APPROVED
OMB. No. 0572-0121
LOAN RESOLUTION
(Public Bodies)
A R E S O L U T I O N O F T H E
O F T H E
AUTHORIZING AND PROVIDING FOR THE INCURRENCE OF INDEBTEDNESS FOR THE PURPOSE OF PROVIDING A
PORTION OF THE COST OF ACQUIRING, CONSTRUCTING, ENLARGING, IMPROVING, AND/OR EXTENDING ITS
FACILITY TO SERVE AN AREA LAWFULLY WITHIN ITS JURISDICTION TO SERVE.
WHEREAS, it is necessary for the _______________________________________________________________________________
(Public Body)
(herein after called Association) to raise a portion of the cost of such undertaking by issuance of its bonds in the principal amount of
__________________________________________________________________________________________________________
pursuant to the provisions of _______________________________________________________________________________; and
WHEREAS, the Association intends to obtain assistance from the United States Department of Agriculture,
(herein called the Government) acting under the provisions of the Consolidated Farm and Rural Development Act (7 U.S.C. 1921
et seq.) in the planning. financing, and supervision of such undertaking and the purchasing of bonds lawfully issued, in the event
that no other acceptable purchaser for such bonds is found by the Association:
NOW THEREFORE, in consideration of the premises the Association hereby resolves:
1. To have prepared on its behalf and to adopt an ordinance or resolution for the issuance of its bonds containing such
items and in such forms as are required by State statutes and as are agreeable and acceptable to the Government.
2. To refinance the unpaid balance, in whole or in part, of its bonds upon the request of the Government if at any time
it shall appear to the Government that the Association is able to refinance its bonds by obtaining a loan for such purposes
from responsible cooperative or private sources at reasonable rates and terms for loans for similar purposes and periods
of time as required by section 333(c) of said Consolidated Farm and Rural Development Act (7 U.S.C. 1983(c)).
3. To provide for, execute, and comply with Form RD 400-4, "Assurance Agreement," and Form RD 400-1, "Equal
Opportunity Agreement," including an "Equal Opportunity Clause," which clause is to be incorporated in, or attached
as a rider to, each construction contract and subcontract involving in excess of $10,000.
4. To indemnify the Government for any payments made or losses suffered by the Government on behalf of the Association.
Such indemnification shall be payable from the same source of funds pledged to pay the bonds or any other legal ly per-
missible source.
5. That upon default in the payments of any principal and accrued interest on the bonds or in the performance of any
covenant or agreement contained herein or in the instruments incident to making or insuring the loan, the Government at
its option may (a) declare the entire principal amount then outstanding and accrued interest immediately due and
payable, (b) for the account of the Association (payable from the source of funds pledged to pay the bonds or any other
legally permissible source), incur and pay reasonable expenses for repair, maintenance, and operation of the facility
and such other reasonable expenses as may be necessary to cure the cause of default, and/or (c) take possession of the
facility, repair, maintain, and operate or rent it. Default under the provisions of this resolution or any instrument incident to
the making or insuring of the loan may be construed by the Government to constitute default under any other instrument
held by the Government and executed or assumed by the Association, and default under any such instrument may be
construed by the Government to constitute default hereunder.
6. Not to sell, transfer, lease, or otherwise encumber the facility or any portion thereof, or interest therein, or permit others
to do so, without the prior written consent of the Government.
7. Not to defease the bonds, or to borrow money, enter into any contractor agreement, or otherwise incur any liabilities
for any purpose in connection with the facility (exclusive of normal maintenance) without the prior written consent of the
Government if such undertaking would involve the source of funds pledged to pay the bonds.
8. To place the proceeds of the bonds on deposit in an account and in a manner approved by the Government. Funds may be
deposited in institutions insured by the State or Federal Government or invested in readily marketable securities backed
by the full faith and credit of the United States. Any income from these accounts will be considered as revenues of the system.
9. To comply with all applicable State and Federal laws and regulations and to continually operate and maintain the facility
in good condition.
10. To provide for the receipt of adequate revenues to meet the requirements of debt service, operation and maintenance, and
the establishment of adequate reserves. Revenue accumulated over and above that needed to pay operating and mainte-
nance, debt service and reserves may only be retained or used to make prepayments on the loan. Revenue cannot be used
to pay any expenses which are not directly incurred for the facility financed by USDA. No free service or use of the
facility will be permitted.
According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless
it displays a valid OMB control number. The valid OMB control number for this information collection is 0572-0121. The time required to complete this information
collection is estimated to average 1 hour per response, incl uding the time for reviewing instructions, searching existing data sources, gathering and maintaining the
data needed, and completing and reviewing the collection of information.
-2-
11. To acquire and maintain such insurance and fidelity bond coverage as may be required by the Government.
12. To establish and maintain such books and records relating to the operation of the facility and its financial affairs and to
provide for required audit thereof as required by the Government, to provide the Government a copy of each such audit
without its request, and to forward to the Government such additional information and reports as it may from time to
time require.
13. To provide the Government at all reasonable times access to all books and records relating to the facility and access to
the property of the system so that the Government may ascertain that the Association is complying with the provisions
hereof and of the instruments incident to the making or insuring of the loan.
14. That if the Government requires that a reserve account be established, disbursements from that account(s) may be used
when necessary for payments due on the bond if sufficient f unds are not otherwise available and prior approval of the
Government is obtained. Also, with the prior written approval of the Government, funds may be withdrawn and
used for such things as emergency maintenance, extensions to facilities and replacement of short lived assets.
15. To provide adequate service to all persons within the service area who can feasibly and legally be served and to obtain
USDA’s concurrence prior to refusing new or adequate services to such persons. Upon failure to provide services which
are feasible and legal, such person shall have a direct right of action against the Association or public body.
16. To comply with the measures identified in the Government's environmental impact analysis for this facility for the pur-
pose of avoiding or reducing the adverse environmental impacts of the facility's construction or operation.
17. To accept a grant in an amount not to exceed $
under the terms offered by the Government; that the
and of the Association are hereby authorized and empowered to take all action necessary
or appropriate in the execution of all written instruments as may be required in regard to or as evidence of such grant; and
to operate the facility under the terms offered in said grant agreement(s).
The provisions hereof and the provisions of all instruments incident to the making or the insuring of the loan, unless otherwise
specifically provided by the terms of such instrument, shall be binding upon the Association as long as the bonds are held or
insured by the Government or assignee. The provisions of sections 6 through 17 hereof may be provided for in more specific
detail in the bond resolution or ordinance; to the extent that the provisions contained in such bond resolution or ordinance
should be found to be inconsistent with the provisions hereof, these provisions shall be construed as controlling between the
Association and the Government or assignee.
The vote was: Yeas Nays Absent
IN WITNESS WHEREOF, the of the
has duly adopted this resolution and caused it
to be executed by the officers below in duplicate on this , day of
(SEAL) B y
Attest: Title
Title
- 3 -
CERTIFICATION TO BE EXECUTED AT LOAN CLOSING
I, the undersigned, as of the
hereby certify that the of such Association is composed of
members, of whom , constituting a quorum, were present at a meeting thereof duly called and
held on the ; and that the foregoing resolution was adopted at such meeting day of
by the vote shown above, I further certify that as of ,
the date of closing of the loan from the United States Department of Agriculture, said resolution remains in effect and has not been
rescinded or amended in any way.
Dated, this day of
Title
August 19, 2022
USDA is an equal opportunity provider, employer and lender.
If you wish to file a Civil Rights program complaint of discrimination, complete the USDA Program Discrimination Complaint Form (PDF),
found online at http://www.ascr.usda.gov/complaint_filing_cust.html, or at any USDA office, or call (866) 632-9992 to request the form.
You may also write a letter containing all of the information requested in the form. Send your completed complaint form or letter to us by
mail at U.S. Department of Agriculture, Director, Office of Adjudication, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410,
by fax (202) 690-7442 or email at program.intake@usda.gov.
Rural Development
State Office
Strom Thurmond
Federal Building
1835 Assembly
Street, Suite 1007,
Columbia, SC 29201
Voice: 803.765.5163
Fax: 855.565.9482
TDD: 803.765.5697
City of Westminster
PO Box 399
Westminster, SC 29693-0399
SUBJECT: Letter of Conditions
Recipient Name: City of Westminster
Project Name: Water Infrastructure System Improvements
CFDA NUMBER – 10.760
RUS Loan: $8,705,000
Dear Mayor Brian Ramey:
This letter establishes conditions which must be understood and agreed to by you
before further consideration may be given to your application. The loan will be
administered on behalf of the Rural Utilities Service (RUS) by the State and Area
staff of USDA Rural Development (RD), both of which are referred to throughout
this letter as the Agency. Any changes in project cost, source of funds, scope of
project, or any other significant changes in the project or applicant must be reported
to and concurred with by the Agency by written amendment to this letter. This
includes any significant changes in the Applicant’s financial condition, operation,
organizational structure or executive leadership. Any changes made without Agency
concurrence shall be cause for discontinuing processing of the application.
This letter does not constitute loan approval, nor does it ensure that funds are or will
be available for the project. The funding is being processed on the basis of a loan not
to exceed $8,705,000.00. The loan will be considered approved on the date Form RD
1940-1, “Request for Obligation of Funds” is signed by the Agency approval official.
The applicant will ensure projects are completed in a timely, efficient, and
economical manner. You must meet all conditions set forth under Section III –
Requirements Prior to Advertising for Bids within 1 year of this letter.
If you do not meet the conditions of this letter, the Agency reserves the right to
withdraw Agency funding.
If you agree to meet the conditions set forth in this letter and desire further
consideration be given to your application, please complete and return the following
forms within 15 days:
Form RD 1942-46, “Letter of Intent to Meet Conditions”
Form RD 1940-1, “Request for Obligation of Funds”
2
All parties may access information and regulations referenced in this letter at our website located
at https://www.rd.usda.gov/programs-services/water-environmental-programs/water-waste-
disposal-loan-grant-program.
.
The conditions are as follows:
SECTION I - PROJECT SCOPE
Project Description – Funds will be used to upgrade existing lines to include 33,200 LF 10",
42,200 LF 8", and 10,800 LF 6". A 40,000 gallon ground storage tank will be replaced with a
250,000 gallon ground tank.
Facilities will be designed and constructed in accordance with sound engineering practices and
must meet the requirements of Federal, State, and local agencies. The proposed facility design
must be based on the Preliminary Engineering Report (PER), prepared by Rosier Group, dated
August 2020 and amended 7/29/2022, as concurred with by the Agency.
1. Project Funding – The Agency is offering the following funding for your project:
RUS Loan - $ 8,705,000.00
TOTAL PROJECT COST - $ 8,705,000.00
Any changes in funding sources following obligation of Agency funds must be reported to the
processing official. Prior to loan closing, any increase in non-Agency funding will be applied
first as a reduction to Agency grant funds, up to the total amount of the grant, and then as a
reduction to Agency loan funds.
The applicant must certify that they have exhausted all other funding avenues and have no
pending funding considerations from any other sources. Further, the applicant must certify that
they do not intend to apply anywhere else for funding for this project. If, after obligation of
Agency funds, other funding becomes available, the Agency reserves the right to deobligate any
and all funding for this project and to re-underwrite. This may result in the offering of a
different funding package to for this project.
Prior to advertisement for construction bids, you must provide evidence of applicant
contributions and other funding sources. This evidence should include a copy of the commitment
letter. Agency funds will not be used to pre-finance funds committed to the project from other
sources.
3
2. Project Budget – Funding from all sources has been budgeted for the estimated expenditures
as follows:
Project Costs: Total Budgeted:
Development $7,275,500
Contingency 727,500
Engineering Fees
Includes:
Design 410,000
Resident Project Representation (Inspection) 150,000
Additional Services 10,000
Interest - Interim 100,000
Legal Fees 32,000
TOTAL $ 8,705,000
Project feasibility and funding will be reassessed if there is a significant change in project costs
after bids are received. Obligated loan and/or grant funds not needed to complete the proposed
project will be deobligated. Any reduction will be applied to Agency grant funds first. If actual
project costs exceed the project cost estimates, an additional contribution by the Owner may be
necessary. An “Amended Letter of Conditions” will be issued for any changes to the total
project budget.
3. Project Timeline – To ensure that the project proceeds in a timely manner, key processing
milestones have been established in accordance with the PER or other Agency approved
documentation. Projects should be completed, and Agency funds fully disbursed within
three years of obligation. By agreeing to the terms herein, you agree to comply with the
milestones identified below. If, for any reason, one or more of the milestones cannot be met, you
must notify the Agency in writing at least 30 days prior to the referenced date. Should your final
completion date become more than three years after obligation the written request will follow the
procedures outlined in Section VI of this letter, including the submission of not less than 90 days
prior to the benchmark. The correspondence must contain a valid explanation as to why the
milestone cannot be met and include a proposed revised project completion schedule. If the
Agency agrees to the modification, a written confirmation will be issued. The Agency reserves
the right to de-obligate loan and/or grant funds, or take other appropriate action, if the
established or amended deadlines are not met.
Milestone Date
Land & Easement Acquisition 06/01/2023
Plans & Specifications, and Design Complete 06/01/2023
Permits Acquisition Complete 06/01/2023
Initial Advertisement for Bids 08/01/2023
Award Contract(s)/Initiate Construction 10/01/2023
Substantial Completion 06/01/2025
4
Final Completion 08/01/2024
SECTION II – RATES & TERMS
4. Interest Rates and Loan Terms – The interest rate will be the lower of the rate in effect at
the time of loan approval or the time of loan closing unless you request otherwise. Should the
interest rate be reduced, the payment will be recalculated to the lower amount. The payment due
date will be established as the day that the loan closes.
Your loan will be scheduled for repayment over a period of 40 years. Payments will be equal
monthly amortized installments beginning one month after closing. For planning purposes, use a
2.625% interest which provides for a monthly payment of $29,336. The precise payment amount
will be based on the interest rate at which the loan is closed and may be different than the one
above.
5. Security – The loan will be secured by a Revenue bond with first lien position in the amount
of $8,705,000. The bond will be fully registered as to both principal and interest in the name of
the “United States of America, Acting through the United States Department of Agriculture.”
Bond Counsel will be utilized in preparation of these documents.
The bond and any ordinance or resolution relating thereto must not contain any provision in
conflict with the Agency Loan Resolution, applicable regulations, or associated laws. There
must be no defeasance or refinancing clause in conflict with the graduation requirements of 7
U.S.C. 1983.
Additional security requirements are contained in RUS Bulletin 1780-27, “Loan Resolution
(Public Bodies). A draft of all security instruments, including draft bond resolution, must be
reviewed and concurred in by the Agency prior to advertising for bids. Bond/loan resolutions
must be duly adopted and executed prior to loan closing.
6. Reserves – Reserves must be properly budgeted and set aside to maintain the financial
viability and sustainability of any operation. Reserves are important to fund unanticipated
emergency repairs, to assist with debt service should the need arise, and for the replacement of
assets which have a useful life less than the repayment period of the loan. The following
reserves are required to be established as a condition of this loan:
a. Debt Service Reserve – As a part of this Agency loan proposal, you must establish a
debt service reserve fund equal to at least one annual loan installment that accumulates at
the rate of 10% of one annual payment per year for ten years or until the balance is equal
to one annual loan payment. For planning purposes, 10% of the proposed loan
installment would equal $2,934 per month; this amount should be deposited monthly
until a total of $352,032 has accumulated. Prior written concurrence from the Agency
must be obtained before funds may be withdrawn from this account during the life of the
loan. When funds are withdrawn during the life of the loan, deposits will continue as
designated above until the fully funded amount is reached.
5
b. Short-Lived Asset Reserve – In addition to the debt service reserve fund, you must
establish a short-lived asset reserve fund. Based on the PER, you must deposit at least
$94,000 into the short-lived asset reserve fund annually for the life of the loan to pay for
repairs and/or replacement of major system assets. It is your responsibility to assess your
facility’s short-lived asset needs on a regular basis and adjust the amount deposited to
meet those needs.
SECTION III –REQUIREMENTS PRIOR TO ADVERTISING FOR BIDS
7. Organization – The Bond Counsel transcripts of proceedings must show that your
organization is a duly incorporated public body and has continued legal existence. Your
organization must have the authority to own, construct, operate, and maintain the proposed
facility, as well as for borrowing money, pledging security and raising revenues.
8. Suspension and Debarment Screening – You will be asked to provide information on the
principals of your organization. Agency staff must conduct screening for suspension and
debarment of the entity, as well as its principals through the Do Not Pay Portal.
a. Principal –
i. An officer, director, owner, partner, principal investigator, or other person
within a participant with management or supervisory responsibilities related to
a covered transaction; or
ii. A consultant or other person, whether or not employed by the participant or
paid with federal funds, who –
1. Is in a position to handle federal funds.
2. Is in a position to influence or control the use of those funds; or,
3. Occupies a technical or professional position capable of substantially
influencing the development or outcome of an activity required to
perform the covered transaction. (2 CFR §180.995)
9. Engineering Services – You are required to complete an Agreement for Engineering
Services, which should consist of the Engineers Joint Contract Documents Committee (EJCDC)
documents as indicated in RUS Bulletin 1780-26, “Guidance for the Use of EJCDC Documents
on Water and Waste Projects with RUS Financial Assistance,” or other approved form of
agreement. The Agency will provide concurrence prior to advertising for bids and must approve
any modifications to this agreement.
10. Contract Documents, Final Plans, and Specifications- All development will be completed
by contract in accordance with applicable provisions of RUS Instruction 1780, Subpart C –
Planning, Designing, Bidding, Contracting, Constructing and Inspections, (copy available upon
request), and in compliance with all statutory requirements. You are responsible to share this
with your engineer before pre-design.
a. The plans and specifications and all proposals required by law must be approved by
South Carolina Department of Health and Environmental Control.
6
b. In preparing final design and providing service to the planned project area, you and your
engineer will comply with all zoning and planning requirements of the appropriate
governing bodies where service is to be provided.
c. The Agency will need to concur in the plans and specifications prior to advertising for
bids. The Agency may require an updated cost estimate if a significant amount of time
has elapsed between the original project cost estimate and advertising for bids.
d. The use of any procurement method other than competitive sealed bids must be requested
in writing and approved by the Agency.
e. The contract documents must consist of the EJCDC construction contract documents as
indicated in RUS Bulletin 1780-26 or other Agency-approved forms of agreement.
f. American Iron and Steel Requirements. Section 746 of Title VII of the Consolidated
Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and
Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent
statutes mandating domestic preference applies the American Iron and Steel (AIS)
requirement to obligations made after May 5, 2017:
(1) No Federal funds made available for this fiscal year for the rural water, wastewater,
waste disposal, and solid waste management programs authorized by the
Consolidated Farm and Rural Development Act (7 U.S.C. 1926 et seq.) shall be used
for a project for the construction, alteration, maintenance, or repair of a public water
or wastewater system unless all of the iron and steel products used in the project are
produced in the United States.
(2) The term “iron and steel products” means the following products made primarily of
iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal
castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel,
reinforced precast concrete, and construction materials.
(3) The requirement shall not apply in any case or category of cases in which the
Secretary of Agriculture (in this section referred to as the “Secretary”) or the designee
of the Secretary finds that—
(a) applying the requirement would be inconsistent with the public interest;
(b) iron and steel products are not produced in the United States in sufficient and
reasonably available quantities or of a satisfactory quality; or
(c) inclusion of iron and steel products produced in the United States will increase the
cost of the overall project by more than 25 percent.
(4) Owners are ultimately responsible for compliance with AIS requirements (as defined
in RUS Bulletin 1780-35).
(a) Sign loan resolutions, grant agreements and letters of intent to meet conditions
which include AIS language, accepting AIS requirements in those documents and
in the letter of conditions.
(b) Sign agreements for engineering services, executed construction contracts and all
other appropriate and necessary documents which include AIS language.
7
Change Orders and Partial Payment Estimates: Acknowledge responsibility for
compliance with AIS requirements by signing change orders (EJCDC C-941) and
partial payment estimates (EJCDC C-620).
(c) Substantial completion of project: Obtain the certification letters from the
consulting engineer and maintain this documentation for the life of the loan.
(d) Special Cases
i. Where Owner provides their own engineering, the Owner’s responsibilities will
include items listed in Section 5 of RUS Bulletin 1780-35.
ii. Where Owner performs their own construction, the Owner’s responsibilities
will include items listed in Section 6 of RUS Bulletin 1780-35.
iii. Where Owner directly procures AIS products, Owner must utilize EJCDC
Procurement Series standard contract documents following RUS Bulletin 1780-26
Exhibit D and obtain manufacturers’ certifications and provide copies to Engineer and
Contractor.
11. Legal Services –A legal services agreement is required with your attorney and bond counsel,
if applicable, for any legal work needed in connection with this project. The agreement should
stipulate an hourly rate for the work, with a “not to exceed” amount for the services, including
reimbursable expenses. RUS Bulletin 1780-7, “Legal Services Agreement,” or similar format
may be used. The Agency will provide concurrence prior to advertising for bids. Any changes
to the fees or services spelled out in the original agreement must be reflected in an amendment to
the agreement and have prior Agency concurrence.
12. Property Rights
- Prior to advertising for bids, you and your legal counsel must furnish
satisfactory evidence that you have adequate continuous and valid control over the lands and
rights-of-way needed for the project. Acquisitions of necessary land and rights must be
accomplished in accordance with the Uniform Relocation Assistance and Real Property
Acquisition Policies Act. Such control over the lands and rights will be evidenced by the
following:
a. Right-of-Way Map – Your engineer will provide a map clearly showing the location of
all lands and rights-of-way needed for the project. The map must designate public and
private lands and rights and the appropriate legal ownership thereof.
b. Form RD 442-20, “Right-of-Way Easement” – This form, or similar format, may be
used to obtain any necessary easements for the proposed project.
c. Form RD 442-21, “Right-of-Way Certificate” – You will provide a certification on this
form that all right-of-way requirements have been obtained for the proposed project.
d. Form RD 442-22, “Opinion of Counsel Relative to Rights-of-Way” – Your attorney
will provide a certification and legal opinion on this form addressing rights-of-way,
easements, and title.
e. Preliminary Title Work (Title Opinion) – When applicable, your attorney or title
company will provide a preliminary title opinion for any property related to the facility,
currently owned and to be acquired, along with copies of deeds, contracts or options for
purchasing said property. Form RD 1927-9, “Preliminary Title Opinion,” may be used.
The approving official may waive title defects or restrictions, such as utility easements, that do
not adversely affect the suitability, successful operation, security value, or transferability of the
8
facility. Any such waivers must be provided by the approving official in writing prior to closing
or the start of construction, whichever occurs first.
You are responsible for the acquisition of all property rights necessary for the project and for
determining that prices paid are reasonable and fair. The Agency may require an appraisal by an
independent appraiser or Agency employee in order to validate the price to be paid.
13. System Policies, Procedures, Contracts, and Agreements – The facility must be operated
on a sound business plan which involves adopting policies, procedures, and/or ordinances
outlining the conditions of service and use of the proposed system. Mandatory connection
policies should be used where enforceable. The policies, procedures, and/or ordinances must
contain an effective collection policy for accounts not paid in full within a specified number of
days after the date of billing. They should include appropriate late fees, specified timeframes for
disconnection of service, and reconnection fees. A draft of these policies, procedures, and/or
ordinances must be submitted for Agency review and concurrence, along with the documents
below, before closing instructions may be issued unless otherwise stated.
a. Conflict of Interest Policy – Prior to obligation of funds, you must certify in writing that
your organization has in place up-to-date written standards of conduct covering conflict
of interest. The standards of conduct must include disciplinary actions in the event of a
violation by officers, employees, or agents of the borrower. The standards identified
herein apply to any parent, affiliate or subsidiary organization of the borrower that is not
a state or local government, or Indian Tribe. Policies and accompanying documents shall
be furnished to Rural Development upon request.
You must also submit a disclosure of planned or potential transactions related to the use
of Federal funds that may constitute or present the appearance of personal or
organizational conflict of interest. Disclosure must be in the form of a written letter
signed and dated by the applicant’s official. A negative disclosure in the same format is
required if no conflicts are anticipated.
Sample conflict of interest policies may be found at the National Council of Nonprofits
website, https://www.councilofnonprofits.org/tools-resources/conflict-of-interest
, or in
Internal Revenue Service Form 1023, Appendix A, “Sample Conflict of Interest Policy,”
at
http://www.irs.gov/pub/irs-pdf/i1023.pdf. Though these examples reference non-profit
corporations, the requirement applies to all types of Agency borrowers.
Assistance in developing a conflict-of-interest policy is available through Agency-
contracted technical assistance providers if desired.
b. Contracts for Other Services/Lease Agreement – Drafts of any contracts or other
forms of agreements for other services, including audit, management, operation, and
maintenance, or lease agreements covering real property essential to the successful
operation of the facility, must be submitted to the Agency for review and concurrence
prior to advertising for bids.
9
Fully executed copies of any policies, procedures, ordinances, contracts, or agreements above
must be submitted prior to loan closing, with the exception of the conflict-of-interest policy,
which must be in place prior to obligation of funds.
14. Closing Instructions – The Agency will prepare closing instructions as soon as the
requirements of the previous paragraphs are complete, as well as a draft of the security
instrument(s). Both your bond and legal counsel must comply with these instructions when
closing the Agency loan/grant.
15. System Users – This letter of conditions is based upon your indication at application that
there will be at least 3,335 residential users, 60 non-residential users, and 1 bulk / wholesale
users on the existing system when construction is completed.
Before the Agency can agree to the project being advertised for construction bids, you must
certify that the number of users indicated at application are currently using the system or signed
up to use the system once it is operational.
If the actual number of existing and/or proposed users that have signed up for service is less than
the number indicated at the time of application, you must provide the Agency with a written plan
on how you will obtain the necessary revenue to adequately cash flow the expected operation,
maintenance, debt service, and reserve requirements of the proposed project (e.g., increase user
rates, sign up an adequate number of other users, reduce project scope, etc.). Similar action is
required if there is cause to modify the anticipated flows or volumes presented following
approval.
a. Positive Program to Encourage Connections – You must provide a positive program to
encourage connection by all users as soon as service is available. The program will be
reviewed by the Agency prior to advertising for bids. A guide for developing your
positive program is available from the Agency.
b. Water/Sewer User Agreements – Users will be required to execute a Water/Sewer
Users Agreement prior to advertising for construction bids. The amount of cash
contributions required will be set by you and concurred with by the Agency.
Contributions should be an amount high enough to indicate sincere interest on the part of
the potential user, but not so high as to preclude service to low-income families, and must
have a deadline for the contribution to be used or forfeited. RUS Bulletin 1780-9, “Water
Users Agreement,” or similar agreement may be used.
c. Service Declination Statement – Each potential user who is located along planned lines
and declines the offered service will be provided an opportunity to sign a “Service
Declination Statement.”
16. Construction Account – A separate construction account is not required for project funds.
However, the recipient must be able to separately identify, report and account for all Federal
funds, including the receipt, obligation and expenditure of funds, in accordance with 2 CFR
200.305. These funds must be deposited in a bank with Federal Deposit Insurance Corporation
(FDIC) insurance coverage. If the balances at the financial institution where federal funds
will be deposited exceeds the FDIC insurance coverage, the excess amount must be
10
collaterally secured up to 100 percent of the highest amount of funds expected to be
deposited in the account at any one time, per the Department of Treasury regulations and
requirements.
17. Interim Financing – The Agency’s policy is to utilize interim financing for all loans
exceeding $500,000. Prepayment penalties on interim financing are not allowed. Borrowers are
required to seek interim financing initially from private or cooperative lenders if funds can be
borrowed at reasonable interest rates on an interim basis from those sources for the construction
period. The fact that a commercial lender’s rates are higher than current Agency interest rates
does not necessarily mean that the commercial rate is not reasonable.
18. Proposed Operating Budget – You must establish and/or maintain a rate schedule that
provides adequate income to meet the minimum requirements for operation and maintenance (O
and M), debt service, and reserves. Prior to advertising for bids, you must submit a proposed
annual operating budget to the Agency, as well as your proposed rate schedule. The operating
budget should be based on a typical year cash flow after completion of the construction phase
and should be signed by the appropriate official of your organization. Form RD 442-7,
“Operating Budget,” or similar format may be utilized for this purpose. It is expected that O and
M expenses will change over each successive year and user rates will need to be adjusted on a
regular basis.
Technical assistance is available at no cost to help you evaluate and complete a rate analysis on
your system. This assistance is available free to your organization. If you are interested, please
contact our office for information.
19. Permits –The owner or responsible party will be required to obtain all applicable permits for
the project, prior to advertising for bids. The consulting engineer must submit written evidence
that all applicable permits required prior to construction have been obtained with submission to
the Agency of the final plans, specifications, and bid documents.
20. Risk and Resilience Assessment/Emergency Response Plan (RRA/ERP) – The Agency
requires all financed water and wastewater systems to have an RRA/ERP in place. New water or
wastewater systems must provide a certification that an ERP is complete prior to the start of
operation, and a certification that an RRA is complete must be submitted within one year of the
start of operation. Borrowers with existing systems must provide a certification that an
RRA/ERP has been completed prior to advertising for bids. Technical assistance is available in
preparing these documents at no cost to you.
Before funds are drawn, you should have in place a cybersecurity plan, a supply chain plan, and
a plan to comply with cybersecurity requirements of the National Institute of Science and
Technology and the Cybersecurity and Infrastructure Security Administration. These items
should be addressed in the RRA/ERP.
The RRA/ERP documents themselves are not submitted to the Agency. The RRA/ERP must
address potential impacts from natural disasters and other emergency events. It should include
11
plans to address impacts of flash flooding in areas where severe drought or wildfires occur. The
documents should be reviewed and updated every five years at a minimum.
21. Bid Authorization - Once all the conditions outlined in Section III of this letter have been
met, the Agency will authorize you to advertise the project for construction bids. Such
advertisement must be in accordance with applicable State statutes.
SECTION IV - REQUIREMENTS PRIOR TO START OF CONSTRUCTION
22. Disbursement of Agency Funds - Agency funds will be disbursed electronically into the
construction account as they are needed. SF 3881, “ACH Vendor/Miscellaneous Payment
Enrollment Form,” must be completed and submitted to the Agency prior to commencement of
construction.
The order of disbursement is as follows: 1) Applicant contribution, 2) other funding sources, 3)
interim financing or Agency loan funds, and 4) Agency grant funds. Interim financing or
Agency loan funds will be expended after all other funding sources unless a written agreement is
reached with all other funding sources on how funds are to be disbursed prior the first
disbursement. Interim financing funds or Agency loan funds must be used prior to the use of
Agency grant funds. Agency Grant funds must not be disbursed prior to loan funds except as
authorized in 7 CFR 1780.45(d).
23. Bid Tabulation – Immediately after bid opening, you must provide the Agency with the bid
tabulation and your engineer’s evaluation of bids and recommendations for contract awards. If
the Agency agrees that the construction bids received are acceptable, adequate funds are
available to cover the total project costs, and all the requirements of Section III of this letter have
been satisfied, the Agency will authorize you to issue the Notice of Award.
a. Cost Overruns – If bids are higher than expected, or if unexpected construction
problems are encountered, you must utilize all options to reduce cost overruns.
Negotiations, redesign, use of bidding alternatives, rebidding or other means will be
considered prior to commitment of subsequent funding by the Agency. Any requests for
subsequent funding to cover cost overruns will be contingent on the availability of funds.
Cost overruns exceeding 20 percent of the development cost at time of loan or grant
approval or where the scope of the original purpose has changed will compete for funds
with all other applications on hand as of that date.
b. Excess Funds - If bids are lower than anticipated at time of obligation, excess funds must
be deobligated prior to start of construction except in the cases addressed in this
paragraph. In cases where the original PER for the project included items that were not
bid, or were bid as an alternate, the State Office official may modify the project to fully
utilize obligated funds for those items. Amendments to the PER, ER, and Letter of
Conditions may be needed for any work not included in the original project scope. In all
cases, prior to start of construction, excess funds will be deobligated, with grant funds
being deobligated first. Excess funds do not include contingency funds as described in
this letter.
12
24. Suspension and Debarment Screening – In accordance with 2 CFR Part 180, Subpart C, as
a condition of the transaction and the responsibilities to persons at the next lower tier with whom
you enter into transactions, you must conduct screening for suspension and debarment of lower
tier recipients (e.g., vendors, contractors, etc.).
25. Contract Review – Your attorney will certify that the executed contract documents,
including performance and payment bonds, if required, are adequate and that the persons
executing these documents have been properly authorized to do so in accordance with 7 CFR
1780.61(b).
Once your attorney has certified that they are acceptable, the contract documents will be
submitted to the Agency for concurrence. Construction cannot commence until the Agency has
concurred in the construction contracts.
26. Final Rights of Way – Your attorney or title company must furnish a separate final title
opinion or Title Insurance Policy on all real property related to the facility, now owned and to be
acquired for this project, as of the day of loan closing or start of construction, whichever occurs
first. Form RD 1927-10, “Final Title Opinion” may be used.
If any of the right-of-way forms listed previously in this letter contain exceptions that do not
adversely affect the suitability, successful operation, security value, or transferability of the
facility, the approving official must provide a written waiver prior to the issuance of the Notice
to Proceed.
27. Insurance and Bonding Requirements - Prior to the start of construction or loan closing,
whichever occurs first, you must acquire and submit to the Agency proof of the types of
insurance and bond coverage for the borrower shown below. The use of deductibles may be
allowed, providing you have the financial resources to cover potential claims requiring payment
of the deductible. The Agency strongly recommends that you have your engineer, attorney, and
insurance provider(s) review proposed types and amounts of coverage, including any exclusions
and deductible provisions. It is your responsibility and not that of the Agency to assure that
adequate insurance and fidelity bond coverage is maintained.
a. General Liability Insurance – Include vehicular coverage.
b. Workers’ Compensation – In accordance with appropriate State laws.
c. Guaranty or Fidelity Insurance–Coverage for all persons who have access to funds,
including persons working under a contract or management agreement. Coverage may be
provided either for all individual positions or persons, or through “blanket” coverage
providing protection for all appropriate employees. Each position is to be insured in an
amount equal to the maximum amount of funds expected to be under the control of that
position at any one time. The minimum coverage allowed will be an amount equal to the
total annual debt service payment on the Agency loans. The coverage may be increased
during construction based on the anticipated monthly advances.
d. National Flood Insurance - If the project involves acquisition or construction in a
designated special flood area, the community in which the acquisition or construction is
13
situated must be currently participating in the national flood insurance program.
Additionally, if the project involves acquisition or constriction in designated special flood
or mudslide prone areas, a flood insurance policy must be in place at the time of loan
closing.
e. Real Property Insurance – Fire and extended coverage will normally be maintained on
all structures except reservoirs, pipelines and other structures if such structures are not
normally insured, and subsurface lift stations except for the value of electrical and
pumping equipment. The Agency will be listed as mortgagee on the policy when the
Agency has a lien on the property. Prior to the acceptance of the facility from the
contractor(s), you must obtain real property insurance (fire and extended coverage) on all
facilities identified above.
The Agency is to be listed as “Other Insured” so as to receive notifications on all insurance,
regardless of security. Insurance types described above are required to be continued throughout
the life of the loan. See Section VII.
28. Initial Civil Rights Compliance Review – The Agency will conduct an initial civil rights
compliance review of the borrower prior to loan closing or start of construction, whichever
occurs first, in accordance with 7 CFR 1901, Subpart E. You are expected to comply with the
completion of the review, including the furnishing of any documents, records, or other applicable
material.
SECTION V – REQUIREMENTS PRIOR TO CLOSING
29. Interim Financing. Interim financing is being used. Generally, loan closing will occur near
the end of construction when interim funds are fully disbursed. Documents detailed above from
Sections II and III regarding security, electronic payments (Form 3550-28), and system policies,
procedures, contracts, and agreements must be adopted and/or executed and submitted to the
Agency prior to loan closing.
30. Electronic Payments – Payments will be made through an electronic preauthorized debit
system. You will be required to complete Form RD 3550-28, “Authorization Agreement for
Preauthorized Payments,” for all new and existing indebtedness to the Agency prior to loan
closing.
31. Other Requirements – All requirements contained in the Agency’s closing instructions, as
well as any requirements of your bond counsel and/or attorney, must be met prior to loan closing.
a. System for Award Management. You will be required to maintain a Unique Entity
ID (UEI) and maintain an active registration in the System for Award Management
(SAM) database. Renewal can be completed online at:
http://sam.gov. This
registration must be renewed and revalidated every 12 months for as long as there is an
active loan, grant, or guaranteed loan with the Agency.
To ensure the information is current, accurate and complete, and to prevent the SAM account
expiration, the review and updates must be performed within 365 days of the activation date,
14
commonly referred to as the expiration date. The registration process may take up to 10 business
days. (See 2 CFR Part 25 and the “Help” section at http://sam.gov).
b. Litigation. You are required to notify the Agency within 30 days of receiving
notification of being involved in any type of litigation prior to loan closing or start of
construction, whichever occurs first. Additional documentation regarding the situation
and litigation may be requested by the Agency.
c. Certified Operator. Evidence must be provided that your system has or will have a
certified operator, as defined by applicable State or Federal requirements, available
prior to the system becoming operational, or that a suitable supervisory agreement with
a certified operator is in effect.
SECTION VI – REQUIREMENTS DURING CONSTRUCTION AND POST
CONSTRUCTION
32. Construction Completion Timeframe – Following the benchmarks established in Section
I, Item 4, Project Timeline, all projects should be completed, and Agency funds fully disbursed
within three years of the date of obligation. If funds are not disbursed within three years of
obligation and you have not already done so per Section I, Item 4, you must submit a written
request for extension of time to the Agency with adequate justification of the circumstances,
including any beyond your control. The request must be submitted at least 90 days prior to the
end of the three-year timeframe and include a revised estimated date of completion. The Agency
will typically only allow one extension. Subsequent requests for waivers beyond the initial
extension or requests that exceed five years from the initial date of obligation will be submitted
to the RUS, Water and Environmental Programs for consideration. The Agency retains the right
to de-obligate any loan and/or grant monies, or take other appropriate action, related to
unliquidated funds that exceed the timeframes above and are not under an active extension.
33. Resident Inspector(s) – Full-time inspection is required unless you request an exception.
Such requests must be made in writing and the Agency must provide written concurrence.
Inspection services are to be provided by the consulting engineer unless other arrangements are
requested in writing and concurred with by the Agency. A resume of qualifications of any
resident inspector(s) will be submitted to the owner and Agency for review and concurrence
prior to the pre-construction conference. The resident inspector(s) must attend the
preconstruction conference.
34. Preconstruction Conference – A
preconstruction conference will be held prior to the
issuance of the Notice to Proceed. The consulting engineer will review the planned development
with the Agency, owner, resident inspector, attorney, contractor, other funders, and other
interested parties, and will provide minutes of this meeting to the owner and Agency.
35. Inspections - The Agency requires a preconstruction conference, pre-final, final, and
warranty inspections. Your engineer will schedule a warranty inspection with the contractor and
the Agency before the end of the one-year warranty period to address and/or resolve any
outstanding warranty issues. The Agency will conduct an inspection with you of your records
15
management system at the same time and will continue to inspect the facility and your records
system every three years for the life of the loan. See Section VII of this letter.
36. Change Orders – A Change Order must be submitted for all modifications to the approved
scope of work, including existing contracts. This includes non-physical modifications such as
any time extension requests. Prior written Agency concurrence is required for all Change
Orders.
37. Payments – Prior Agency concurrence is required for all invoices and requests for payment
before Agency funds will be released. Requests for payment related to a contract or service
agreement will be signed by the owner, project engineer, and contractor or service provider prior
to Agency concurrence. Invoices not related to a construction contract or service agreement will
include the owner’s written concurrence.
38. Use of Remaining Funds – As stated above, applicant contribution and connection or tap
fees will be the first funds expended in the project. Funds remaining after all costs incident to
the basic project have been paid or provided will be handled as follows:
a. Funds remaining after the applicant contribution and connection fees may be considered
in direct proportion to the amounts of funding obtained from each source. The use of
Agency funding will be limited to eligible loan and grant purposes, provided the use will
not result in major changes to the original scope of work and the purpose of the loan and
grant remains the same.
b. Any reductions in the Agency funding will be first applied to the grant funds.
c. Grant funds not expended for authorized purposes will be cancelled (de-obligated) within
60 days of final completion of project. Prior to actual cancellation, you, your attorney
and engineer will be notified of the Agency’s intent to cancel the remaining funds and
given appropriate appeal rights.
d. Under no circumstances is it appropriate to use remaining funds as contributions to a new
project outside the scope of the funded project.
e. Loan funds that are not needed will be cancelled (de-obligated) prior to loan closing.
39. Technical, Managerial and Financial Capacity - It is required that members of the Board
of Directors, City Council members, trustees, commissioners and other governing members
possess the necessary technical, managerial, and financial capacity skills to consistently comply
with pertinent Federal and State laws and requirements. It is recommended members receive
training within one year of appointment or election to the governing board, and a refresher
training for all governing members on a routine basis. The content and amount of training should
be tailored to the needs of the individual and the utility system. Technical assistance providers
are available to provide this training for your organization, often at no cost. Contact the Agency
for additional information.
16
40. Reporting Requirements Related to Expenditure of Funds -- An annual audit under 2
CFR 200 is required if you expend $750,000 or more in Federal financial assistance per fiscal
year. The total Federal funds expended from all sources shall be used to determine Federal
financial assistance expended. Expenditures of interim financing are considered Federal
expenditures.
All audits are to be performed in accordance with 2 CFR Part 200, as adopted by USDA through
2 CFR Part 400. Further guidance on preparing an acceptable audit can be obtained from the
Agency. The audit must be prepared by an independent licensed Certified Public Accountant, or
a State or Federal auditor if allowed by State law and must be submitted within 9 months of your
fiscal year end. Both the audit and accompanying management report must be submitted for
review.
If an audit is required, you must enter into a written agreement with the auditor and submit a
copy of that agreement to the Agency prior to the advertisement of construction bids. The audit
agreement may include terms and conditions that the borrower and auditor deem appropriate;
however, the agreement should include the type of audit to be completed, the time frame in
which the audit will be completed, and how irregularities will be reported.
SECTION VII – SERVICING REQUIREMENTS DURING THE TERM OF THE LOAN
41. Prepayment and Extra Payments - Prepayments of scheduled installments, or any portion
thereof, may be made at any time at the option of borrower, with no penalty.
Security instruments, including bonding documents, must contain the following language
regarding extra payments, unless prohibited by State statute:
Prepayments of scheduled installments, or any portion thereof, may be made at any time
at the option of borrower. Refunds, extra payments and loan proceeds obtained from
outside sources for the purpose of paying down the Agency debt, shall, after payment of
interest, be applied to the installments last to become due under this note and shall not
affect the obligation of borrower to pay the remaining installments as scheduled in your
security instruments.
42. Annual Financial Reporting/Audit Requirements – You are required to submit an annual
financial report at the end of each fiscal year. The annual report will be certified by the
appropriate organization official, and will consist of financial information, a current rate
schedule, and listing of board members with their terms. Financial statements must be prepared
on an accrual basis of accounting in accordance with generally accepted accounting principles
(GAAP). The annual report will include separate reporting for each water and waste disposal
facility, and itemized cash accounts by type (debt service, short-lived assets, etc.) under each
facility. All records, books and supporting material are to be retained for three years after the
issuance of the annual report. Technical assistance is available, at no cost, with preparing
financial reports.
17
The type of financial information that must be submitted is specified below:
a. Audits – An audit under the Single Audit Act is required if you expend $750,000 or more
in Federal financial assistance per fiscal year. The total Federal funds expended from all
sources shall be used to determine Federal financial assistance expended. Expenditures
of interim financing are considered Federal expenditures.
See Section VI for additional information regarding audits.
b. Financial Statements – If you expend less than $750,000 in Federal financial assistance
per fiscal year, you may submit financial statements in lieu of an audit which include, at a
minimum, a balance sheet and an income and expense statement. You may use Form RD
442-2, “Statement of Budget, Income and Equity,” and 442-3, “Balance Sheet,” or
similar format to provide the financial information. The financial statements must be
signed by the appropriate borrower official and submitted within 60 days of your fiscal
year end.
43. Annual Budget and Projected Cash Flow - Thirty days prior to the beginning of each fiscal
year, you will be required to submit an annual budget and projected cash flow to this office. The
budget must be signed by the appropriate borrower official. Form RD 442-2, “Statement of
Budget, Income and Equity,” or similar format may be used.
Technical assistance is available at no cost to help you evaluate and complete a rate analysis on
your system, as well as completing the annual budget.
44. Graduation - By accepting this loan, you are also agreeing to refinance (graduate) the
unpaid loan balance in whole, or in part, upon request of the Government. If at any time the
Agency determines you can obtain a loan for such purposes from responsible cooperative or
private sources at reasonable rates and terms, you will be requested to refinance. Your ability to
refinance will be assessed every other year for those loans that are five years old or older.
45. Security/Operational Inspections – The Agency will inspect the facility and conduct a
review of your operations and records management system and conflict of interest policy every
three years for the life of the loan. You must participate in these inspections and provide the
required information.
46. System for Award Management. You will be required to maintain a Unique Entity ID
(UEI) and maintain an active registration in the System for Award Management (SAM) database.
Further information can be found at paragraph 31 of this letter.
47. Risk and Resiliency Assessment/Emergency Response Plan (RRA/ERP) – The RRA/ERP
is further outlined under Section III of this letter. You will be required to submit a certification
to the servicing office every five years that the RRA/ERP is current and covers all sites related to
the facility. The RRA/ERP documents themselves are not submitted to the Agency. The
RRA/ERP must address potential impacts from natural disast
Text truncated. Open the original for the full document.