RecordWell Data

Backup Material

Oconee County · Oconee County · meeting of Feb 23, 2026 · Other

Open the original document More from Oconee County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

OCONEE COUNTY BOARD OF ZONING APPEALS 415 S. Pine St. Walhalla, SC 29691 864.638.4218 OconeeSC.com planninginfo@oconeesc.com The meeting will be broadcasted live on the County’s YouTube channel, which can be found on the County’s website at www.oconeesc.com. Rev. 07/2025 BOARD MEMBERS Jim Henderson, District 1 Gwen Fowler, District 2 Bill Gilster, District 3 Jason Cox, District 4 Chad Overholt, District 5 John Eagar, At-Large Wayne McCall, At-Large AGENDA Monday, February 23, 2026 – 6:00 PM Oconee County Council Chambers 1. Call to Order 2. Election of Officers a. Chairman b. Vice Chairman c. Secretary 3. Approval of Minutes: December 17, 2025 meeting 4. Brief statement about rules and procedures 5. Special Exception Application SE25-000003. Umair Ali requests relief from the Fair Play Village Overlay District for a service station. Ref. Sec. 38-11.2 (2) D 1. TMS 337- 00-03-009; Address: 503 E. Fairplay Blvd. Fair Play, SC 29643. 6. Variance Application VA25-000017. Umair Ali requests relief from the setback requirement in Appendix A for a service station. Ref. Appendix A (a) 3. TMS 337-00- 03-009; Address: 503 E. Fairplay Blvd. Fair Play, SC 29643. 7. Adjourn OCONEE COUNTY BOARD OF ZONING APPEALS 415 S. Pine St. Walhalla, SC 29691 864.638.4218 OconeeSC.com planninginfo@oconeesc.com The meeting will be broadcasted live on the County’s YouTube channel, which can be found on the County’s website at www.oconeesc.com. Rev. 07/2025 BOARD MEMBERS John Eagar, Chairman, At-Large Jim Henderson, District 1 Gwen Fowler, District 2 Bill Gilster, District 3 Jason Cox, District 4 Tim Mays, District 5 Wayne McCall, At-Large STAFF Elise Dunaway MINUTES Monday, December 17, 2025 – 6:00 PM Oconee County Council Chambers 1. Call to Order – Mr. Eagar called the meeting to order at 6:00 PM. 2. Motion to approve the minutes from November 24, 2025 – Mr. Mays made a motion to approve the minutes; seconded by Mr. McCall. Mr. Eagar called for a vote. The motion passed 6-0. 3. 2026 Meeting Calendar Revision – Mr. Mays made a motion to accept the revision to the 2026 Meeting Calendar. Seconded by Mr. Gilster. Approved Unanimously. 4. Brief statement about rules and procedures – Mr. Eagar outlined the proceedings of the meeting going forward: • The applicant will provide a presentation regarding the needs for the variance for 5-minutes with the Board having the ability to grant more time if needed. • The Board will ask questions after each presenter • The staff will address any additional issues • Citizen comments will be allowed for period of 3-minutes each with the Board’s request that the speakers not repeat what others are saying, but rather concur or state other facts not previously presented • There will be an applicant rebuttal period if necessary • The Board will ask any further questions before deliberations • Once the Board begins its deliberations, there will be no further input from the floor. and the Board will begin it’s voting on four questions, and a negative vote on any one of the four questions will require a denial of the variance or special exception. OCONEE COUNTY BOARD OF ZONING APPEALS 415 S. Pine St. Walhalla, SC 29691 864.638.4218 OconeeSC.com planninginfo@oconeesc.com The meeting will be broadcasted live on the County’s YouTube channel, which can be found on the County’s website at www.oconeesc.com. Rev. 07/2025 1. Variance application VA25-000019 - David Irvine requests relief from Sec. 16- 122 to build over the floodplain less than 3 feet above the base flood elevation. TMS 052-03-06-010; Address: 331 Time Out Pl. Tamassee, SC 29686. Applicant Comments: Stated Name: David Irvine Mr. Irvine explains he is wanting to add onto his house on Lake Cherokee. He is requesting to build at the same height as the rest of the house within the floodplain. In 2005, the highest level of water in Lake Cherokee was 1079.6ft. Staff comments: Miss. Dunaway reminds the board to consider Section 1.2 Background and Meaning of Variance from the Variances and the National Flood Insurance Program that states, “In some cases, a variance granted for floodplain management purposes can result in a project that does not meet the minimum standards of the NFIP. Because a variance can lead to an increased risk to life and property, variances from flood elevation requirements or other floodplain management requirements should be granted only rarely.” Public comment: NA Applicant rebuttal: NA Board Questions/ Discussion: The Board reviews Chapter 16-166 Considerations and Ch. 16-169 Conditions. Consideration of VA25-00019: I. There are extraordinary and exceptional conditions pertaining to the particular piece of property: a. Motion – Mr. McCall made a motion in the affirmative, seconded by Mr. Mays. No discussion b. Vote In-favor Opposed 6 0 OCONEE COUNTY BOARD OF ZONING APPEALS 415 S. Pine St. Walhalla, SC 29691 864.638.4218 OconeeSC.com planninginfo@oconeesc.com The meeting will be broadcasted live on the County’s YouTube channel, which can be found on the County’s website at www.oconeesc.com. Rev. 07/2025 II. These conditions do not generally apply to other property in the vicinity: a. Motion – Mr. Henderson made a motion in the affirmative, seconded by Mr. Mays. No Discussion b. Vote In-favor Opposed 6 0 III. Because of these conditions, the application of this chapter to the particular piece of property would effectively prohibit or unreasonably restrict the utilization of the property. a. Motion – Mr. Gilster made a motion in the affirmative, seconded by Mr. Mays. No discussion. b. Vote In-favor Opposed 6 0 IV. The authorization of a variance will not be of substantial detriment to adjacent uses or to the public good, and the character of the district will not be harmed by the granting of the variance. a. Motion – Mr. Mays made a motion in the affirmative, seconded by Mrs. Fowler. No Discussion. Mr. Eager opposed. b. Vote In-favor Opposed 5 1 V. Mr. Eagar asked for an amendment – Based on the evidence presented to the Board, do I hear a motion that the proposed variance be Approved based upon Oconee County being held harmless in the event there is ever any damage to the property resulting from flooding and that the property owner maintain adequate FEMA Flood insurance on the property regardless of the cost. a. Motion – Failed due to no second OCONEE COUNTY BOARD OF ZONING APPEALS 415 S. Pine St. Walhalla, SC 29691 864.638.4218 OconeeSC.com planninginfo@oconeesc.com The meeting will be broadcasted live on the County’s YouTube channel, which can be found on the County’s website at www.oconeesc.com. Rev. 07/2025 VI. Mr. Eagar asked – Based on the evidence presented to the Board, do I hear a motion that the proposed variance be Approved. a. Motion – Mr. McCall made a motion; seconded by Mrs. Fowler. b. Discussion regarding conditions attached to the approval: NA c. Vote In-favor Opposed 6 0 Mr. Eagar noted that the variance request was Approved. 5. Adjourn- Motion by Mr. Gilster. Second by Mr. McCall. Approved 6-0 Freedom of Information Act - Variance Application Permitting Information Code section from which a variance is requested Sec-38-10.2 Upload Supporting Documentation Here Application is Application is not Is not APPLICANT RESPONSES TO SECTION 38-7.1 Describe the extraordinary and exceptional condition (such as size, shape, and topography) that pertains to the subject property that does not generally apply to other land or structures in the vicinity.: The place is small and if we put canopy in 25 feet set back it will not give us enough room to maneuver for vehicles Which brings us very close to the main building if we can put canopy little further from building it gives us enough safe space to maneuver and turn around if it needs to be Are the circumstances affecting the subject property the result of actions by the applicant/owner? Explain. No, the circumstances affecting the subject property are not the result of actions by the applicant or owner. The need for the variance arises from the existing site conditions and roadway configuration, which limit the available area for development while maintaining safe vehicle circulation and access. The current road alignment and required driveway placement constrain the location of the proposed canopy and fuel dispensers. These conditions existed prior to the applicant’s involvement and were not created by any changes made to the property. The proposed 5 foot setback for the canopy is necessary to achieve proper site functionality and safety while maintaining compliance with other zoning and design requirements. The request is consistent with typical commercial gas station layouts and does not result from any self-imposed hardship by the owner. Describe the ways in which application of the requirement(s) of the ordinance effectively prohibit or unreasonably restrict the utilization of the subject property.: Strict application of the 25-foot front setback requirement unreasonably restricts the functional use and development potential of the subject property. The existing road alignment, right-of-way limits, and required driveway locations reduce the available buildable area for proper fuel canopy placement and safe vehicle circulation. Will the proposed variance result in an activity that will not be of substantial detriment to adjacent uses or to the public good, and the character of the district will not be harmed by the granting of the variance. Explain.: Maintaining the full 25-foot setback would force the canopy and fuel dispensers too far from the road, leaving inadequate maneuvering space between the canopy, parking, and the convenience store building. This restriction would make it difficult to safely accommodate customer traffic, fuel deliveries, and emergency vehicle access — effectively preventing the property from being developed as a modern, compliant gas station. The requested 5 foot setback provides the minimum necessary relief to allow reasonable use of the land consistent with its commercial zoning, while still preserving public safety and the overall intent of the ordinance. General Contractor ICC 113.2 Limitations on authority. An application for appeal shall be based on a claim that the true intent of this code of the rules legally adopted there under have been incorrectly interpreted, the provisions of this code do not fully apply or an equally good or better form of construction is proposed. The board shall have no authority to waive requirements of this code. Comments OCONEE COUNTYS APPROVAL, PERMITTING, AND/OR INSPECTION(S) OF THIS PROJECT DOES NOT MEAN THAT THE PROJECT IS IN COMPLIANCE WITH ALL APPLICABLE SUBDIVISION AND/OR HOMEOWNERS ASSOCIATION, OR SIMILAR ENTITYS, BUILDING AND LAND USE REQUIREMENTS OR RESTRICTIONS, BY SIGNING BELOW YOU ACKNOWLEDGE THAT COMPLIANCE WITH ANY SUCH STANDARDS IS YOUR RESPONSIBILITY. Workflow Reviews Information 2/18/26, 1:34 PM Permit Details | Citizenserve https://www3.citizenserve.com/Admin/PermitController?Action=DisplayPermitDetail&SelectedTab=Permits&Permit_ID=52621793&WorkOrder_ID=904… 1/3 Fair Play Development Corporation February 12, 2026 To: The members of the Board of Zoning Appeals, Oconee County, SC Ref: Special Exception Application SE25-000003 and Variance Application VA25-000017 We write regarding the application, by Umair Ali / Gondal Gee Enterprise LLC, for approval of the following 2 exceptions for a proposed service station located at 503 E. Fairplay Blvd., Fair Play SC 29643 (TMS 337-00-03-009): 1. Variance Application VA25-000017 requesting relief from the setback requirement in Appendix A for a service station. Ref Appendix A (a) 3 2. Special Exception Application SE25-000003 requesting relief from the Fair Play Village Overlay District for a service station. Ref. Section 38-11.2 (2) D 1 Our understanding is that currently there are no drawings or building specifications to review, simply the application for permission to install a service station and receive relief from setback requirements if granted. We would ask that the BZA take the following into account as they deliberate their decision on this application: ● Village of Fair Play Strategic Master Plan (Attached) – this plan was developed in partnership with Oconee County in 2012 and updated in late 2021/early 2022. The Plan recognized opportunities along Fair Play Boulevard for reinvestment that will create a more vibrant business district, gathering places for citizens of the community and a more pedestrian and bicycle friendly community. While the Plan does not dictate specific uses or businesses, it did include before and after drawings of key sites and buildings to help portray the strategic vision for the Village, including retaining and updating façade renovations for existing buildings. This included the vacant building located on the property in question before the BZA. Without drawings or building specifications to review and therefore an understanding of what is intended by the applicant for this building, we cannot determine if the proposed service station is in fact aligned with the Strategic Master Plan. ○ Based on this we strongly request that more information is provided to the BZA so that they can make an informed decision. ● Fair Play Village Overlay – in reviewing the application for a special exception, the BZA will have the option on whether to require structures on the property to conform to the standards established in Appendix A (38-11.2 (2) D 1 [our understanding is requirements contained in 38-11.2 (2) D 4 in terms of heights, signage etc. will automatically apply]. In our opinion, PO Box 103 Fair Play, SC 29643 fairplaydevelopment@gmail.com Fair Play Development Corporation Appendix A building standards SHOULD be applied if the applicant is to replace the existing vacant building with a new structure (again this is unclear as there are no proposed drawings etc included with the application). This would ensure that the design and appearance would at the very least align with the existing buildings of e.g. Yoders and Diamond T in terms of roof lines, siding, use of stone etc. and therefore more closely align with the overall Strategic Master Plan. We appreciate the time and effort the BZA puts into reviewing these applications to ensure the best needs of the community are met. Thank you for your time and consideration of our input. Yours Sincerely, Alicia Walker President, Fair Play Development Corp PO Box 103 Fair Play, SC 29643 fairplaydevelopment@gmail.com Fair Play Development Corporation Questions from the Community 1. Will it be open 24/7? 2. Will it offer regular and diesel and non-ethanol and/or electric charging stations? a. How many tanks will there be? b. What regulations will they be required to meet? 3. Semi trucks (18 Wheelers) a. Will there be parking for them? b. Will there be diesel gas pumps for them? 4. Will the car gas lanes be sufficient size for vehicles with trailers, boats etc.? 5. Has traffic been studied to confirm if the roads can sufficiently handle the ingress and egress into the proposed station? 6. Are there mandatory provisions in case of gasoline fire? a. We have a volunteer fire department, do they have the proper equipment? b. Are there rules around proximity of a gas station to a fire department? 7. What products will the service station sell other than gasoline? a. Alcohol? b. Cigarettes? c. Lottery? d. Food? i. Hot, cold? PO Box 103, Fair Play, 29643

Source: Oconee County website. First collected Oct 31, 2026.