BOA-26-29, 7056 Camden Hwy. (County) - Staff Report
City of Sumter · Sumter County · meeting of Nov 4, 2026 · Other
Open the original document More from City of Sumter
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Sumter City-County
Board of Zoning Appeals
November 4, 2026
BOA-26-29, 7056 Camden Hwy. (County)
The Board of Zoning Appeals will consider a request from Harmoni
Gateway Towers, LLC to establish a 279 ft. tall telecommunications
tower on the property. The Zoning Administrator has referred this
request to the Board of Zoning Appeals consistent with Article
5.b.4: Communication Towers and Antenne of the Sumter County
Zoning & Development Standards Ordinance. The property is
located at 7056 Camden Hwy., is zoned Agricultural Conservation
(AC), and is identified as TMS# 088-00-03-028.
2
Sumter City-County
Zoning Board of Appeals
November 4, 2026
BOA-26-29, 7056 Camden Hwy. (County)
I. THE REQUEST
Applicant(s): Harmoni Gateway Towers, LLC
Status of the Applicant: Authorized Agent (Leaseholder)
Request:
Request to establish a 279 ft. tall telecommunications tower on
the property.
County Council District: 1
Location: 7056 Camden Hwy.
Zoning: Agricultural Conservation (AC)
Tax Map Reference: 088-00-03-028
II. B ACKGROUND
Communications towers and/or antenna may be treated as Conditional Uses in Sumter County
without further review by the Sumter City- County Board of Zoning Appeals if the Zoning
Administrator determines all
applicable conditions in the
Ordinance are met. The Zoning
Administrator has referred the
request by Harmoni Gateway
Towers, LLC to construct a 279 ft.
self-supported telecommunications
tower at 7056 Camden Hwy. for
decision by the Board of Zoning
Appeals consistent with Article
5.b.4: Communication Towers and
Antennae.
The property is zoned Agricultural
Conservation (AC) and is located
on Camden Hwy (US-521).
3
approximately 950 ft. south of the intersection of Camden Hwy and Dais Rd. The property is
shown in red on the map on the previous page.
Under the AC district zoning regulations which govern the property, telecommunications towers
are evaluated in accordance with Article 1.h.4.c and Article 3.d.4 and in accordance with Article
5.b.4. of the Sumter County Zoning & Development Standards Ordinance.
A copy of the overall property boundary with the proposed tower lease area identified, the
proposed site development plan, and elevation drawing of the tower are included as Exhibit 1.
Figure 1 - Property boundary with proposed tower lease area identified in the northwest corner
4
Figure 2 – Proposed site development plan
Figure 3 – Proposed tower elevation drawing with Antenna Locations Identified
5
Figure 4 - Photo Simulation of Proposed Tower from Camden Hwy (US-521) Looking South
Figure 5 - Photo Simulation of Proposed Tower from Camden Hwy (US-521) Looking North
6
Below is a list of exhibits pertaining to this case:
Exhibit # Description
1 Site Plans titled “Harmoni Tower ID SC0009812”, sheets T-1, Survey, Z-1, Z-2,
and Z-3, last revised January 16, 2026
2 Structural Design Report for 279’ S3TL Series HD2 Self-Supporting Tower, Site:
Borden, SC, Site Number: SC0009812, Dated January 21, 2026.
3 NEPA Report for Site, Prepared by Trileaf Environmental Architecture and
Engineering, Dated January 23, 2026
4 Signed Unrecorded Memorandum of Easement Agreement, executed by buyer and
seller on February 2, 2026
5 ASR Registration Search Record for Registration 1332844, retrieved September 3,
2026
6 ULS License, PCS Broadband License – KNLH718 – Cellco Partnership,
retrieved June 11, 2026
7 Tower Removal Agreement Letter Dated June 8, 2026
8 Letter from Harmoni Towers Gateway, LLC certifying that facilities will comply
with government rules and regulations and will maintain general liability
insurance, Dated April 1, 2026
9 Certificate of Liability Insurance, Dated March 20, 2026
10 Photo-simulation images depicting proposed tower visual impact (2 images, one
facing north on US-521 and one facing south on US-521)
11 Tower Fall Radius Letter – Nello 280’ NSX Lattice Self Support Tower, Dated
June 5, 2026
12 Tower Fall Radius Letter – Nello 280’ NSX Lattice Self Support Tower, Dated
July 10, 2026
13 Letter from Applicant Attorney to County Attorney, and attached plans dated
October 5, 2026
III. SPECIAL EXCEPTION REVIEW CRITERIA
In the AC zoning district under Article 3, Exhibit 3 -5, telecommunications towers are special
exception uses requiring the review and approval of the BZA, unless the Zoning Administrator
determines all applicable conditions in the Ordinance are met. Special exception requests for
telecommunications towers are evaluated in accordance with Article 1.h.4.c. and Article 5.b.4. as
contained in the Sumter County Zoning & Development Standards Ordinance.
Article 1.h.4.c: Special Exceptions
Permits for Special Exceptions shall be evaluated by the Board of Zoning Appeals on the basis of
the following criteria:
1. That the Special Exception complies with all applicable development standards contained
elsewhere in this Ordinance, including landscaping and bufferyards, off -street parking,
and dimensional requirements;
7
Case Facts:
1. Telecommunications tower development standards are discussed later in this report.
There are no general Ordinance- specified development standards applicable to this
site that have not been addressed.
2. That the special exception will be in substantial harmony with the area in which it is
located;
Case Facts:
1. The subject property and parcels immediately adjacent on all sides are zoned
Agricultural Conservation (AC).
2. The parcel on which the tower is proposed is undeveloped and is currently an open
field.
3. There is a single-family residence located +/- 500 ft. to the southwest of the proposed
tower location and a single-family home located +/- 150 ft. the north across Camden
Hwy.
4. The proposed 279 ft. self-support telecommunications tower is approximately 55 ft.
from the edge of the existing public road right-of-way.
3. That the special exception will not discourage or negate the use of surrounding property
for use(s) permitted by right.
Case Facts:
1. The subject property and parcels immediately adjacent on all sides are zoned
Agricultural Conservation (AC).
2. There is a single-family residence located +/- 500 ft. to the southwest of the proposed
tower location and a single -family home located +/ - 150 ft. the north across Camden
Hwy.
3. The proposed 279 ft. self -support telecommunications tower approximately 55 ft.
from the edge of the existing public road right-of-way
8
Article 5.b.4. Communication Towers and Antennae:
Application Requirements: The applicant for a permit for construction of a communications
tower or the placement of a communications antenna on an existing structure other than a tower
previously permitted must file with the Zoning Administrator an application accompanied by a
fee of $500.00 and the following documents:
1. Specifications
2. Site Plan
3. Tower Location Map
4. Antenna Capacity – Wind Load
5. Antenna Owners
6. Owner Authorization
7. FCC License
8. Visual Impact Analysis
9. Removal Agreement
Case Facts:
• The applicant has submitted all aforementioned documents via Minor Site Plan
#MSP-26-24.
Conditions: Applicant must show that all of the following conditions are met:
1. Location and Visual Impact : The proposed tower, antenna or accessory structure
will be placed on site in such a manner that it will minimize the visual impact on the
surrounding properties;
Case Facts:
• The applicant is proposing to install a 279 ft. self-support telecommunications
tower approximately 55 ft. from the edge of the existing public road right-of-
way.
• Figures #4 and #5 as submitted by the applicant represent photo simulation of
the proposed tower as viewed from Camden Hwy.
2. Inability to locate on existing structures: The applicant must show that a proposed
antenna and equipment cannot be accommodated and function as required by
applicable regulations and the applicants’ technical design requirements without
unreasonable modifications on any existing structure or tower under control of
applicant, or to locate on an available and suitable nearby tower at reasonable costs
(i.e., at or below local area rent average);
Case Facts:
• There are no known telecommunications towers within the immediate area of
the site.
3. Necessity for location in residential district: The applicant must show that the
portion of the county intended to receive coverage cannot be adequately served by a
9
communications tower or antenna placed in a non-residential district for valid
technical reasons;
Case Facts:
• The proposed site is not in a residential zoning district.
4. Public property or other private property not suitable: Prior to consideration of a
permit for location on private property which must be acquired, the applicant must
show that available publicly owned sites, and available privately owned sites
occupied by a compatible use, are unsuitable for operation of the facility under
applicable communications regulations and the applicant’s technical design
requirements;
Case Facts:
• There are no suitable publicly-owned sites within the vicinity of the proposed
site.
5. Design for multiple use: Applicants must show that a new tower is designed to
accommodate additional antennae equal to applicant’s present and future
requirements;
Case Facts:
• The applicant’s design plans indicate three separate antenna arrays. The top
array is identified for future Verizon antennas, and the two additional arrays
are unspecified as to future users.
6. Safety Codes Met: Applicant must show that all applicable health, nuisance, fire,
building, and life safety code requirements are met;
Case Facts:
• The project is subject to Sumter County building permit requirements. The
Building Department has not completed review of the application to date,
• All code requirements must be addressed by the applicant as a condition of
any building permit issuance.
7. Paint and illumination: A communications tower must not be painted or illuminated
unless otherwise required by state or federal regulations;
Case Facts:
• The tower is not proposed to be painted or illuminated, except for required
safety beacons at the top and midpoint of the tower.
8. Distance from existing tower: A permit for a proposed tower site within 1,000 ft. of
an existing tower shall not be issued unless the applicant certifies that the existing
tower does not meet the applicant’s structural specifications and design
requirements, or that a co-location agreement could not be obtained;
10
Case Facts:
• There is a Verizon Wireless tower located +/- 1,900 linear feet to the
northwest of the site. There are no towers within 1,000 ft. of the proposed
site.
9. Indemnity and claims resolution: The applicant must show by certification from a
registered professional engineer that the proposed facility will contain only
equipment meeting FCC rules, and must file with the Zoning Administrator a written
indemnification of Sumter County and proof of liability insurance or financial ability
to respond to claims up to $1,000,000.00 dollars in the aggregate which may arise
from the operation of the facilities during its life, at no cost to the county and in a
form approved by the County Attorney.
Case Facts:
• The applicant has submitted a written indemnification of Sumter County and
proof of liability insurance.
10. Minimum Setback:
Non-Residential Zoning: Towers located on non-residentially zoned properties
must be set back from all lot lines by distances equal to the district setback
requirement or the tower’s fall zone, whichever is greater. Fall zones less than
the full height of the tower shall be determined by an engineer licensed in the
state of South Carolina in a letter that includes the engineer’s signature and seal.
Case Facts:
• The applicant submitted a fall radius letter signed and sealed by South
Carolina-licensed professional engineer Jason Mark Lambert dated June 5,
2026. In the letter, Mr. Lambert states that the tower has been designed using
119 mph 3-second gust wind with no ice and a 30 mph 3-second wind gust
with 1 inch of ice.
In the letter, Mr. Lambert stated “Although we cannot guarantee
exactly how a tower would fall if it were to fail, the most likely mode of
failure would be a buckling failure of one of the tower sections due to
excessive wind loading. The tower leg with the highest stress ratio is
located at the 220’ – 240’ level. The stress ratio in that leg is
calculated to be 91% of the code-permitted design loading. Given that
the tower section with the highest stress ratio will most likely fail first,
the proposed tower would fail at the 220’ level with the top 60’ of the
tower collapsing. Depending on the conditions at the time of failure
and the stress levels in structural material below, the top 60’ of the
tower would likely fall within a 60’ fall radius”. (Exhibit 11)
• After staff questioned the stated fall zone of 60’ as being inclusive of a portion
of the right-of-way for US-521, the applicant submitted a revised fall radius
letter signed and sealed by South Carolina-licensed professional engineer
Adam N. Howe dated July 10, 2026. In the letter, Mr. Howe states that the
11
tower has been designed using 119 mph 3-second gust wind with no ice and a
30 mph 3-second wind gust with 1 inch of ice.
In the letter, Mr. Howe stated “Although we cannot guarantee exactly
how a tower would fall if it were to fail, the most likely mode of failure
would be a buckling failure of one of the tower sections due to
excessive wind loading. The tower leg with the highest stress ratio is
located at the 220’ – 240’ level. The stress ratio in that leg is
calculated to be 91% of the code-permitted design loading. Given that
the tower section with the highest stress ratio will most likely fail first,
the proposed tower would fail at the 220’ level with the top 60’ of the
tower collapsing. Depending on the conditions at the time of failure
and the stress levels in structural material below, the top 60’ of the
tower would likely fall within a 37.5’ fall radius”. (Exhibit 12)
11. Technical Assistance: Prior to issuing a permit, the Zoning Administrator may make
use of professional technical services to determine if the standards in Article 5.b.4.d.
are met;
Case Facts:
• The Zoning Administrator has not utilized any outside professional technical
services in the consideration of this request.
12. Maintenance: The communications tower shall be maintained by common corrosion
control procedures so it continuously maintains a minimum visual impact on
surrounding properties
Case Facts:
• All code requirements must be addressed by the applicant as a condition of
any building permit issuance.
12
Special Exception: A tower, pole, or antenna may be permitted by Special Exception together
with the findings considered in Section 1.h.4.c. after a public hearing along with the fol lowing
criteria:
1. All application requirements and conditions imposed by 5.b.4.d. and 5.b.4.e. are
met except height limitations and setbacks;
Case Facts:
1. All application materials required by Article 5.b.4.d. have been submitted by the
applicant.
2. If additional tower height is required, the total tower height will not exceed one
hundred-fifty (150%) percent of the maximum height permitted in the district. In
unincorporated portions of Sumter County, radio and television towers are exempt
at the Board of Appeals from tower height limits (this rule does not apply within the
corporate limits of the City of Sumter);
Case Facts:
1. N/A, No additional tower height is required beyond the maximum height
permitted.
3. The applicant has demonstrated that additional height above that permitted by the
regulations is necessary for service to occupants of an area within the City or
County of Sumter;
Case Facts:
1. N/A, No additional tower height is required beyond the maximum height
permitted.
4. Setback requirements and additional conditions are established by the Zoning
Board of Appeals as it deems necessary to remove dangers to public health and
safety and to protect adjacent property;
Case Facts:
1. 279 ft. self-support telecommunications tower is proposed to be placed 55 ft. from
the edge of the existing public road right-of-way.
5. Prior to approving a permit by Special Exception or on appeal from the Zoning
Administrator, the Board may make use of professional technical services to
determine that the standards in 5.b.4.d and 5.b.4.e. are met.
13
IV. STAFF RECOMMENDATION
The proposed tower’s placement close to Camden Hwy (US -521) carries significant risk to the
Sumter community. Camden Hwy. is a principal arterial roadway, and functions as a critical link
within Sumter County and between Sumter and areas to the north. Introducing a facility which,
in the event of failure, would potentially block this critical corridor is a hazard mitigation risk.
While engineers can design telecommunications towers to buckle or fold over on themselves, the
proposed fall zone represents only 13.4% of the tower's total height. Expecting a freestanding
structure of this size to collapse so perfectly that no part of it lands beyond that distance is highly
unrealistic and outside standard engineering safety margins . W here manufacturers provide
certified "fall zone letters" utilizing advanced hinge -point calculations, the legal and physical
minimum limit typically stops at 33% to 50% of the total height.
If the board makes the necessary findings to approve this request, then staff recommends the
following conditions be applied:
1. If the foundation design used in association with this tower is performed by a third party,
Nello (the entity that prepared the fall zone letter) must review the design in order to
confirm the fall radius remains satisfactory. A report shall be provided concerning this
condition prior to building permit approval for any component of the project.
V. DRAFT MOTIONS FOR BOA-26-29
A. I move the Zoning Board of Appeals approve BOA-26-29, subject to the findings of fact
and conclusions developed by the BZA and so stated:
[reference specific findings as developed based on facts presented in the staff
report, exhibits, and/or during the public hearing.]
B. I move the Zoning Board of Appeals deny BOA-26-29, subject to the following findings
of fact and conclusions developed by the BZA and so stated:
[reference specific findings as developed based on facts presented in the staff
report, exhibits, and/or during the public hearing.]
C. I move the Zoning Board of Appeals enter an alternative motion for BOA-26-29.
VII. BOARD OF APPEALS – September 9, 2026
The Sumter City -County Board of Appeals at its meeting on Wednesday, September 9, 2026,
deferred the request referenced above until the next Board of Zoning Appeals meeting on
Wednesday, October 14, 2026.
14
VII. BOARD OF APPEALS –October 14, 2026
The Sumter City -County Board of Appeals at its meeting on Wednesday, October 14, 2026,
deferred the request referenced above until the next Board of Zoning Appeals meeting on
Wednesday, November 4, 2026.
Exhibit 1
SITE INFORMATION
COPYRIGHT 2025 T-SQUARED SITE SERVICES, LLCC
CAMDEN HIGHWAY
REMBERT, SC 29128
T-1
THESE DOCUMENTS ARE CONFIDENTIAL AND ARE THE SOLE PROPERTY
OF HARMONI TOWERS AND MAY NOT BE REPRODUCED, DISSEMINATED
OR REDISTRIBUTED WITHOUT THE EXPRESS WRITTEN CONSENT OF
HARMONI TOWERS.
HARMONI SITE NAME:
BORDEN
NEW 279'
SELF-SUPPORT TOWER
11.16.26 TM
08.25.25ISSUED FOR REVIEW JDK
0
68160
HARMONI TOWER ID # :
SC0009812
VZW FUZE PROJECT #:
17333601
HERMITAGE, PA 16148
www.t-sqrd.com
2501 SHENANGO VALLEY FREEWAY, SUITE 3
T-SQUARED
SITE SERVICES
HERMITAGE, PA 16148
www.t-sqrd.com
T-SQUARED
SITE SERVICES
2501 SHENANGO VALLEY FREEWAY, SUITE 3
724.308.7855724.308.7855
6210 ARDREY KELL ROAD
SUITE 375
CHARLOTTE, NC 28277
HARMONI TOWERS
FINAL ZDS
PROJECT TEAM
DRAWING INDEX
SHEET SHEET DESCRIPTION
PROJECT DESCRIPTION
THE PURPOSE OF THIS PROJECT IS TO ENHANCE BROADBAND CONNECTIVITY
AND CAPACITY TO THE EXISTING ELIGIBLE WIRELESS FACILITY.
THE PARTIES ABOVE HEREBY APPROVE AND ACCEPT THESE DOCUMENTS AND
AUTHORIZE THE CONTRACTOR TO PROCEED WITH THE CONSTRUCTION
DESCRIBED HEREIN. ALL CONSTRUCTION DOCUMENTS ARE SUBJECT TO REVIEW
BY THE LOCAL BUILDING DEPARTMENT AND ANY CHANGES AND
MODIFICATIONS THE MAY IMPOSE.
LOCATION MAP
APPLICABLE CODES / REFERENCE DOCUMENTS
CALL SOUTH CAROLINA ONE CALL
(800) 721-7877
CALL 3 WORKING DAYS
BEFORE YOU DIG!
HARMONI TOWER ID: BORDEN
AT&T SITE NAME: 17333601
SITE ADDRESS: CAMDEN HIGHWAY
REMBERT, SC 29128
COUNTY: SUMTER COUNTY
E-911 ADDRESS: TBD
AREA OF CONSTRUCTION: RAWLAND
LATITUDE: 34.067385°
LONGITUDE: -80.509680°
LAT/LONG TYPE: NAD83
JURISDICTION: SUMTER COUNTY
ZONING: AF - AGRICULTURAL/FORESTRY
OCCUPANCY CLASSIFICATION: AGRE 4
TYPE OF CONSTRUCTION: II-B
A.D.A. COMPLIANCE: FACILITY IS UNMANNED AND NOT FOR HUMAN
HABITATION
LAND OWNER: JOSEPH AND JOANN TAYLOR LIFE ESTATE
1479 LONGFELLOW AVE
BRONX NY 10460
KENNETH TAYLOR
(803) 968-0732
copsandteens@aol.com
TOWER OWNER: HARMONI TOWERS, LLC
6210 ARDREY KELL ROAD
CHARLOTTE, NC 28277
ELECTRICAL SERVICE PROVIDER: BLACK RIVER ELECTRIC COOPERATIVE INC.
803-469-8060
TELCO PROVIDER: WINDSTREAM
XXX-XXX-XXXX
· INSTALL 279' SELF-SUPPORT TOWER
· INSTALL CHAIN LINK FENCING
· INSTALL (1) UTILITY H-FRAME
· INSTALL (2) FIBER VAULTS
· INSTALL ACCESS ROAD
T-1 TITLE SHEET
DIRECTIONS:
Z-1
ENLARGED SITE PLAN
ALL DRAWINGS CONTAINED HEREIN ARE FORMATTED FOR 11X17 CONTRACTOR SHALL VERIFY ALL PLANS,
EXISTING DIMENSIONS AND CONDITIONS ON THE JOB SITE AND SHALL IMMEDIATELY NOTIFY THE ENGINEER IN
WRITING OF ANY DISCREPANCIES BEFORE PROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR SAME.
ELEVATION
Z-2
SURVEY SURVEY PLAT
SITE PLAN
ZONING DRAWINGS
ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITH THE
CURRENT EDITIONS OF THE FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNING
AUTHORITIES. NOTHING IN THESE PLANS IS TO BE CONSTRUCTED TO PERMIT WORK NOT
CONFORMING TO THE LATEST EDITIONS OF THE FOLLOWING CODES.
· 2021 INTERNATIONAL BUILDING CODE
· 2023 NATIONAL ELECTRIC CODE
· 2009 INTERNATIONAL ENERGY CONSERVATION CODE
· 2018 INTERNATIONAL EXISTING BUILDING CODE
· 2021 INTERNATIONAL FIRE CODE
· 2021 INTERNATIONAL MECHANICAL CODE
· 2021 INTERNATIONAL RESIDENTIAL CODE
Z-3
HARMONI TOWER ID: SC0009812
HARMONI SITE NAME: BORDEN
AT&T SITE ID: 17333601
SITE ADDRESS: CAMDEN HIGHWAY
REMBERT, SC 29128
JURISDICTION: SUMTER COUNTY
SITE TYPE: 279' SELF-SUPPORT
E-911 ADDRESS: ###
HARMONI TOWERS
VESTED IN:
KENNETH TAYLOR
Document 1190, Page 1626
APN: 088-00-03-028
75'x75' Leased Premises
5625 sq ft, 0.1291 acres
S 55°29'32" E 75.00'
S 34°30'28" W 75.00'
N 55°29'32" W 75.00'
N 34°30'28" E 75.00'
30' Access & Utility Easement545 sq ft, 0.0125
acres
Now or Formerly:
GEORGE NATHANIEL TAYLOR & YVONNE B. TAYLOR, Trustees
Document 1302-1594
088-00-02-021
Camden Highway
14
L1
L2
L3
L4
L5
L6
N 34°30'28" E 297.83'
S 51°16'32" E 443.97'
MSI Project No. 61711
Sheet No.1
Harmonin Tower ID#SC009812
Camden Highway
Parcel 088-00-03-028
City of Rembert
County of Sumter
State of South Carolina
of2
Date Signed:
SITE
VICINITY MAP
NORTH
PM:Drafter: CALCAL
REVISION HISTORY
PC: TRM
SPECIAL PURPOSE SURVEY
PREPARED FOR:
HARMONI
TOWERS, LLC
Transforming the Industry
Land Surveys
Zoning Compliance
Environmental Consulting
Property Condition Assessment
Seismic Risk Analysis
Appraisal
Millman Surveying, Inc.
d.b.a CBRE Land Surveying
Corporate Headquarters
950 Main Avenue,
Cleveland, OH 44113
Phone: 800-520-1010
Fax: 330-342-0834
www.millmanland.com
landsurveyors@cbre.com
Surveyor's Seal
GRAPHIC SCALE
”
”
”
”
”
30' ACCESS AND UTILITIES EASEMENT:
FLOOD ZONE:
OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY
COMMITMENT NO. 01-25025513-01T- SCHEDULE A:
CERTIFICATION:
MISCELLANEOUS NOTES:
SYMBOL LEGEND
”
”
”
”
”
75'X75' LEASED PREMISES:
OLD REPUBLIC NATIONAL TITLE INSURANCE COMPANY
COMMITMENT NO. 01-25025513-01T- SCHEDULE B, SECTION II:
X
11-21-2025
N 40°53'32" W 672.80'
N 34°30'28" E 297.83'
S 51°16'32" E 443.97'
S 08°54'28" W 482.11'
65.35'
N 40°51'32" W 118.42'
607.45'
VESTED IN:
KENNETH TAYLOR
Document 1190, Page 1626
APN: 088-00-03-028
Now or Formerly:
GEORGE NATHANIEL TAYLOR & YVONNE B. TAYLOR, Trustees
Document 1302-1594
088-00-02-021
Now or Formerly:
WILLIAM J. KENDRICK
Document 1306-4535
088-00-03-050
Now or Formerly:
ORA SPANN
Document 1006-671
088-00-03-013
Lease Premises
Access
Easement
6.27'
475.84'
Camden Highway
Sheet No.2of2
Date Signed:
NORTH
Transforming the Industry
Land Surveys
Zoning Compliance
Environmental Consulting
Property Condition Assessment
Seismic Risk Analysis
Appraisal
Millman Surveying, Inc.
d.b.a CBRE Land Surveying
Corporate Headquarters
950 Main Avenue,
Cleveland, OH 44113
Phone: 800-520-1010
Fax: 330-342-0834
www.millmanland.com
landsurveyors@cbre.com
Surveyor's Seal
GRAPHIC SCALE
MSI Project No. 61711
Harmonin Tower ID#SC009812
Camden Highway
Parcel 088-00-03-028
City of Rembert
County of Sumter
State of South Carolina
PM:Drafter: CALCAL
PC: TRM
SPECIAL PURPOSE SURVEY
PREPARED FOR:
HARMONI
TOWERS, LLC
11-21-2025
~Grass~
Camden Highway
75' Wide - Public - Asphalt Pavement
14 12.5' Right-of-Way
Book 1319, Page 2276
N 40°53'32" W 672.80'
S 08°54'28" W 482.11'
COPYRIGHT 2025 T-SQUARED SITE SERVICES, LLCC
CAMDEN HIGHWAY
REMBERT, SC 29128
Z-1
THESE DOCUMENTS ARE CONFIDENTIAL AND ARE THE SOLE PROPERTY
OF HARMONI TOWERS AND MAY NOT BE REPRODUCED, DISSEMINATED
OR REDISTRIBUTED WITHOUT THE EXPRESS WRITTEN CONSENT OF
HARMONI TOWERS.
HARMONI SITE NAME:
BORDEN
NEW 279'
SELF-SUPPORT TOWER
11.16.26 TM
08.25.25ISSUED FOR REVIEW JDK
0
68160
HARMONI TOWER ID # :
SC0009812
VZW FUZE PROJECT #:
17333601
HERMITAGE, PA 16148
www.t-sqrd.com
2501 SHENANGO VALLEY FREEWAY, SUITE 3
T-SQUARED
SITE SERVICES
HERMITAGE, PA 16148
www.t-sqrd.com
T-SQUARED
SITE SERVICES
2501 SHENANGO VALLEY FREEWAY, SUITE 3
724.308.7855724.308.7855
6210 ARDREY KELL ROAD
SUITE 375
CHARLOTTE, NC 28277
HARMONI TOWERS
FINAL ZDS
~Grass~
Camden Highway
75' Wide - Public - Asphalt Pavement
14 12.5' Right-of-Way
Book 1319, Page 2276
COPYRIGHT 2025 T-SQUARED SITE SERVICES, LLCC
CAMDEN HIGHWAY
REMBERT, SC 29128
Z-2
THESE DOCUMENTS ARE CONFIDENTIAL AND ARE THE SOLE PROPERTY
OF HARMONI TOWERS AND MAY NOT BE REPRODUCED, DISSEMINATED
OR REDISTRIBUTED WITHOUT THE EXPRESS WRITTEN CONSENT OF
HARMONI TOWERS.
HARMONI SITE NAME:
BORDEN
NEW 279'
SELF-SUPPORT TOWER
11.16.26 TM
08.25.25ISSUED FOR REVIEW JDK
0
68160
HARMONI TOWER ID # :
SC0009812
VZW FUZE PROJECT #:
17333601
HERMITAGE, PA 16148
www.t-sqrd.com
2501 SHENANGO VALLEY FREEWAY, SUITE 3
T-SQUARED
SITE SERVICES
HERMITAGE, PA 16148
www.t-sqrd.com
T-SQUARED
SITE SERVICES
2501 SHENANGO VALLEY FREEWAY, SUITE 3
724.308.7855724.308.7855
6210 ARDREY KELL ROAD
SUITE 375
CHARLOTTE, NC 28277
HARMONI TOWERS
FINAL ZDS
COPYRIGHT 2025 T-SQUARED SITE SERVICES, LLCC
CAMDEN HIGHWAY
REMBERT, SC 29128
Z-3
THESE DOCUMENTS ARE CONFIDENTIAL AND ARE THE SOLE PROPERTY
OF HARMONI TOWERS AND MAY NOT BE REPRODUCED, DISSEMINATED
OR REDISTRIBUTED WITHOUT THE EXPRESS WRITTEN CONSENT OF
HARMONI TOWERS.
HARMONI SITE NAME:
BORDEN
NEW 279'
SELF-SUPPORT TOWER
11.16.26 TM
08.25.25ISSUED FOR REVIEW JDK
0
68160
HARMONI TOWER ID # :
SC0009812
VZW FUZE PROJECT #:
17333601
HERMITAGE, PA 16148
www.t-sqrd.com
2501 SHENANGO VALLEY FREEWAY, SUITE 3
T-SQUARED
SITE SERVICES
HERMITAGE, PA 16148
www.t-sqrd.com
T-SQUARED
SITE SERVICES
2501 SHENANGO VALLEY FREEWAY, SUITE 3
724.308.7855724.308.7855
6210 ARDREY KELL ROAD
SUITE 375
CHARLOTTE, NC 28277
HARMONI TOWERS
FINAL ZDS
Exhibit 3
NEPA Report
January 23, 2026
Borden
Client #SC0009812
Camden Highway
Rembert, Sumter County, South Carolina 29128
Trileaf # 772867
Prepared For: Prepared By:
Harmoni Towers LLC Trileaf Corporation
10801 Executive Center Dr 1775 The Exchange SE, Suite 525
Little Rock, AR 72211 Atlanta, GA 30339
NEPA Report Summary
Site Name/Location:
Borden / Client #SC0009812 / Trileaf #772867
Camden Highway, Rembert, Sumter County, South Carolina 29128
Latitude: 34° 4’ 2.5869” N, Longitude: 80° 30’ 34.8467” W
Project Description:
Harmoni Towers LLC proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of 283 feet and associated equipment within a
50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility
easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease area towards Camden Highway.
1. Is the facility located in an officially designated wilderness area? [47 CFR 1.1307 (a)(1)]
Yes No Data Sources: Site Reconnaissance
Review of 7.5-Minute USGS Topographic Map (Appendix B)
National Wilderness Preservation System Website (www.wilderness.net)
2. Is the facility located in an officially designated wildlife preserve? [47 CFR 1.1307 (a)(2)]
Yes No Data Sources: Site Reconnaissance
Review of 7.5-Minute USGS Topographic Map (Appendix B)
US Fish & Wildlife Service National Wildlife Refuge System Map (Appendix B)
3. Will the facility: (i) affect listed threatened or endangered species or designated critical habitats; or (ii) jeopardize the continued existence of any proposed
endangered or threatened species; or is it likely to result in the destruction or adverse modification of proposed critical habitats, as determined by the
Secretary of the Interior pursuant to the Endangered Species Act of 1973? [47 CFR 1.1307 (a)(3)]
Yes No
Data Sources: Site Reconnaissance
Review of US Fish & Wildlife Service Critical Habitat and Federally Listed Endangered Species (Appendix D)
Informal Biological Assessment (Appendix D)
South Carolina Department of Natural Resources
4. Will the facility affect districts, sites, buildings, structures, or objects significant in American history, architecture, archeology, engineering or culture, that
are listed, or are eligible for listing on the State or National Registers of Historic Places? [47 CFR 1.1307 (a)(4)]
Yes No
Data Sources: Site Reconnaissance
Cultural Resource Investigation (Appendix E)
State Historic Preservation Office Section 106 Review (Appendix E)
5. Will the facility affect an Indian religious site? [47 CFR 1.1307 (a)(5)]
Yes No
Data Sources: Site Reconnaissance
Correspondence with Native American Tribes via FCC TCNS (Appendix F)
Review of Bureau of Indian Affairs Indian Reservation Map (Appendix B)
6. Will the facility be located in a "floodplain", and not be placed at least one (1) foot above the base flood elevation of the floodplain? [47 CFR 1.1307 (a)(6)]
Yes No
Data Sources: Review of FEMA Flood Map (Appendix B)
7. Will the construction of the facility involve significant change in surface features (e.g. wetland fill, deforestation, or water diversion)? [47 CFR 1.1307 (a)(7)]
Yes No
Data Sources: Site Reconnaissance
Review of 7.5-Minute USGS Topographic Map (Appendix B)
Review of US Fish & Wildlife Service National Wetlands Inventory Map (Appendix B)
Review of USDA NRCS Web Soil Survey Map (Appendix B)
8. Will the antenna tower or supporting structure be equipped with high intensity white lights and located in a residential neighborhood, as defined by the
applicable zoning law?
Yes No
Data Sources: Construction Drawings (Appendix A)
It is assumed that clients will not utilize high intensity white lights in residential areas
9. Will the facility cause human exposure to levels of radiofrequency radiation in excess of Commission-adopted guidelines?
Yes No
Data Sources: Construction Drawings (Appendix A) and/or interviews with clients
Clients will comply with the established criteria regarding radio frequency exposure limits , as established at the time
of this report
January 23, 2026
Signature Date
Hannah Dell Trileaf Corporation
Name Company
1
NEPA Report
Introduction
Trileaf Corporation (Trileaf) completed a NEPA Review for the above -referenced Harmoni Towers LLC
(Harmoni Towers) site. The purpose of a NEPA Review is to comply with the National Environmental
Policy Act (NEPA) of 1969. Trileaf performed extensive research by consulting with appropriate state and
federal agencies and reviewing readily available published lists, files, data, and maps to provide our clients
with a complete NEPA document. The following summarizes the scope of work Trileaf performed in
accordance with the Federal Communications Commission’s (FCC’s) rules implementing NEPA (47 CFR
Section 1.1307 (a) (1) through (8) to determine whether any of the below listed FCC special interest items
would be affected by the proposed action. Referenced materials are included as attachments, where
applicable and available.
Harmoni Towers proposes to construct a 279- foot Self-Support Communications Tower, with an overall
height of 283 feet and associated equipment within a 50 -foot by 50-foot fenced area within a 75- foot by
75-foot (5,625-square- foot) lease area. The project includes a 12 -foot-wide gravel drive within an
access/utility easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away
from the lease area towards Camden Highway. The proposed project site is located at approximately
Camden Highway, Rembert, Sumter County, South Carolina 29128 at 34° 4’ 2.5869” North latitude and
80° 30’ 34.8467” West longitude.
During Trileaf’s site reconnaissance, it was observed that the site is currently located within an agricultural
field, and the areas surrounding the site are currently agricultural development and wooded land.
1. Will the facility be located in an officially designated wilderness area?
Trileaf reviewed the USGS 7.5-minute topographic map titled “Rembert” Quadrangle, South Carolina and
information from the National Wilderness Preservation System (NWPS) ( http://www.wilderness.net) to
determine if the site is located within an officially designated wilderness area.
There are cur rently seven (7) officially designated wilderness areas in the State of South Carolina. The
closest wilderness area to the project site is the Congaree National Park Wilderness Area, which is located
approximately 22 miles southwest of the project site.
Based on this review, the project site is not located within an officially designated wilderness area.
2. Will the facility be located in an officially designated wildlife preserve?
Trileaf reviewed the USGS 7.5-minute topographic map titled “Rembert” Quadrangle, South Carolina, and
information from the National Wildlife Refuge (NWR) System (http://www.fws.gov/refuges) to determine
if the site is located within an officially designated wildlife preserve or refuge.
Based on this review, the project site is not located within an officially designated wildlife preserve or
refuge. A copy of the NWR System map is located in Appendix B.
2
3. Will the facility (i) affect listed threatened or endangered species or designated critical habitat;
or (ii) likely jeopardize the continued existence of any proposed endangered or threatened species
or likely result in the destruction or adverse modification of proposed critical habitats, as
determined by the Secretary of the Interior pursuant to the Endangered Species Act of 1973?
The Endangered Species Act (ESA) of 1973 (16 U.S.C. §§ 1536), as amended, protects endangered and
threatened species and the ecosystems upon which they depend. As interpreted and implemented by 50
CFR 402, Section 7 of the ESA directs Federal agencies, in consultation with and with the assistance of the
Secretary of the Interior, to utilize their authorities to further the purposes of the ESA. It also requires every
Federal agency to ensure that any action it authorizes, funds or carries out, is not likely to jeopardize the
continued existence of any endangered or threatened species or results in the destruction or adverse
modification of critical habitat.
On September 26, 2025 , a Trileaf representative visited and photographed the project site to conduct an
Informal Biological Assessment (IBA). In addition, Trileaf reviewed the United States Fish and Wildlife
Service (USFWS) critical habitat information and determined that the site is not located within designated
critical habitat. Based on the results of our assessment, impacts to listed and/or proposed, threatened and
endangered species or critical habitats resulting from the proposed action are not an ticipated. Therefore,
Trileaf determined that the proposed project site will have “no effect” on the species, their habitats, or
designated critical habitats. Copies of the IBA and critical habitat review are located in Appendix D.
FEDERAL
On October 17, 2025, Trileaf reviewed the Section 7 Consultation guidance set forth by the USFWS –
South Carolina Ecological Services Field Office. According to guidance dated January 3, 2023, “f or all
sites with potential projects that have no effect or impact upon federally protected species or designated
critical habitat, no further coordination with the Service is necessary at this time ”. Therefore, as Trileaf
determined the project would have no effect on listed or proposed threatened or endangered species or
critical habitats, no further consultation with the USFWS was required. A copy of the USFWS’ Section 7
guidance is located in Appendix D.
STATE
On October 17, 2025, Trileaf submitted project information to the South Carolina Department of Natural
Resources (SCDNR) through the online portal . An automated project analysis was generated which
indicated there are no records for species of concern within the project area. Therefore, no further
consultation with the SCDNR was required. A copy of the SCDNR project analysis is located in Appendix
D.
4. Will the facility affect districts, sites, buildings, structures, or objects significant in American
history, architecture, archeology, engineering, or culture that are listed, or are eligible for listing, in
the National Register of Historic Places?
Trileaf referred to Section 106 of the National Historic Preservation Act (NHPA) of 1966 as amended (16
U.S.C. §§ 470 et seq.), the Advisory Council on Historic Preservation (ACHP) implementing regulations
(36 CFR Part 800) and the Nationwide Programmatic Agreement (NPA) for Review of Effects on Historic
Properties for Certain Undertakings Approved by the Federal Communications Commission dated
September 2004 to determine if the project site is contained in, on, or within the viewshed of a building,
site, district, structure, or object, significant in American history, architecture, archaeology, engineering, or
culture, that is listed, or eligible for listing on the National Registers of Historic Places, or located in or on
an Indian Religious Site.
3
A search of the National Historic Landmarks (NHL), National Register of Historic Places (NRHP), State
Historic Preservation Office (SHPO) files, and a field survey was conducted by Mr. Jason Flay, Secretary
of Interior-qualified Archaeologist contracted by Trileaf through Acheulean Consulting , to identify any
cultural resources within the area of direct effects and within a 0.75-mile radius for visual effects.
It was determined that there were no historic properties identified within the Area of Potential Effects (APE)
for direct effects, and no historic properties identified within the APE for visual effects. Additionally, the
identification process did not locate archaeological materials that would be directly affected, or sites that
are of cultural or religious significance to Tribes/NHOs. Documentation of these reviews was submitted to
the SHPO via Form 620 on November 26, 2025. The SHPO concurred that the proposed undertaking would
have no direct or visual effects on historic properties in a response letter dated December 28, 2025. A copy
of the SHPO concurrence letter, Form 620, and associated documents are located in Appendix E.
On September 22, 2025, the Sumter County Planning Department and the Sumter County Genealogical
Society were notified of the proposed project and invited to comment on the proposed project’s potential
effect on Historic Properties as well as indicate whether they are interested in consulting further on the
proposed project. Additionally, a legal notice rega rding the proposed telecommunications tower
construction was posted in The Sumter Item on September 24, 2025. No comments from the local
government, historical society, or legal notice have been received by Trileaf. Copies of the correspondence
and legal notice are located in Appendix E.
NATIONAL SCENIC TRAILS
On October 5, 1999, the Cellular Telecommunications Industry Association, Personal Communications
Industry Association, Appalachian Trail Conference, American Hiking Society, and representative
Managing and Supporting Trails Organizations (MSTOs) for the National Scenic Trails signed a resolution
for the Siting of Wireless Telecommunications Facilities Near National Scenic Trails. This resolution states
that if a wireless telecommunications or site management company plans a new or significantly expanded
facility within one mile of a National Scenic Trail, it will notify the non-
profit group that supports the trail.
In order to determine if the site is located within one mile of a National Scenic Trail, Trileaf reviewed
information from the National Park Service (NPS) National Trails System created by the National Trails
System Act of 1968.
Based on this review, the project site is not located within 1 mile of a National Scenic Trail. A copy of the
trails map is located in Appendix B.
5. Will the facility affect any Indian religious sites?
Trileaf referred to Section 106 of the National Historic Preservation Act (NHPA) of 1966 as amended (16
U.S.C. §§ 470 et seq.), the Advisory Council on Historic Preservation (ACHP) implementing regulations
(36 CFR Part 800) and the Nationwide Programmatic Agreement (NPA) for Review of Effects on Historic
Properties for Certain Undertakings Approved by the Federal Communications Commission dated
September 2004 to determine if the project site is located in or on an Indian Religious Site.
On September 16, 2025, Trileaf submitted project information through the Tower Construction Notification
System (TCNS) to the FCC who initiated contact with the tribes on September 19, 2025. As of January 23,
2026, all tribes have confirmed clearance either directly or by default via the FCC referral process. Trileaf
determined that the subject Property is not located on or near a Native American Religious or Sacred Site.
However, if archaeological remains or resources are unearthed during construction activities, Trileaf
recommends that the client stop construction and notify our office immediately. Tribal consultation
documentation and associated correspondence is located in Appendix F.
4
6. Will the facility be located in a floodplain and not be placed at least one (1) foot above the base
flood elevation of the floodplain?
Trileaf reviewed the relevant Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map
(FIRM) Panel #45085C0100E, dated September 28, 2018, to determine if the project was located within
the 100-year floodplain.
Trileaf determined that the property is located in Zone X, areas determined to be outside the 500- year
floodplain. Therefore, the project site is not located within a 100-year floodplain. A copy of the FEMA
FIRM showing the project site location is located in Appendix B.
7. Will the construction of the facility involve significant change in surface features (e.g. wetland
fill, deforestation, or water diversion)?
Trileaf determined through site reconnaissance, review of the relevant USGS 7.5-minute topographic map
titled “Rembert” Quadrangle, South Carolina , and review of the relevant USFWS National Wetlands
Inventory Map ( http://www.fws.gov/wetlands/Data/Mapper.html) that there are no federally designated
wetlands on or in the immediate vicinity of the proposed project site.
Trileaf’s site assessment did not reveal any evidence of potential wetlands or hydrophytic vegetation located
on or in the immediate vicinity of the project site. Additionally, a review of the United States Department
of Agriculture (USDA) Soil Survey (http://websoilsurvey.sc.egov.usda.gov) did not indicate hydric soils at
the project site.
Based on this review, no designated wetland areas were located within the vicinity o f this project and no
significant changes in surface features resulting from the proposed undertaking are anticipated. Copies of
the soil map and wetlands map are located in Appendix B.
8. Zoning/High Intensity White Lights/Radio Frequency
As a standard practice, Harmoni Towers does not construct facilities requiring high intensity white lights
that are to be located in residentially zoned neighborhoods. According to Harmoni Towers, high intensity
white lights will not be used for towers less than 500 feet in height.
9. Radio Frequency
FCC licensees transmitting from antennas mounted on Harmoni Towers owned antenna structures will
comply with the established criteria regarding radio frequency exposure limits in accordance with the
Second Report and Order, as well as the FCC Code of Federal Regulations [47 CFR § 1.1307, § 1.1310]
published at the time of this report.
5
Conclusion
A NEPA Review of the proposed undertaking was performed by Trileaf Corporation in conformance with
the FCC rules and regulations for implementing NEPA; 47 CFR 1.1301 to 1.1319.
Based on data obtained during the Site visit, consultation with government agencies, and a review of readily
available information from other sources, the preparation and filing of an Environmental Assessment will
not be required and no further NEPA-related action is required for the proposed undertaking.
Qualifications
Hanna
h Dell
Assistant Project Manager
Laura Elston
Quality Assurance
Morg
an Rasmussen
Senior Project Manager
Appendix A
Site Plans
Appendix B
Site Maps
Site Location & Surrounding Properties
Site Location
Aerial Photographs (2024)
Harmoni Towers LLC – Borden
Camden Highway
Rembert, South Carolina 29128
Easement
Rembert Quadrangle, South Carolina (2018)
Contour Interval = 10 Feet
Scale 1 Inch = ~2,000 Feet
Latitude: 34° 4’ 2.5868” N, Longitude: 80° 30’ 34.8467” W
North
Site Vicinity Map
Harmoni Towers LLC – Borden
Camden Highway
Rembert, South Carolina 29128
Site Location
National Flood Hazard Layer FIRMette
0 500 1,000 1,500 2,000250
Feet
Ü
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOOD
HAZARD AREAS
Without Base Flood Elevation (BFE)
Zone A, V, A99
With BFE or Depth Zone AE, AO, AH, VE, AR
Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas
of 1% annual chance flood with average
depth less than one foot or with drainage
areas of less than one square mile Zone X
Future Conditions 1% Annual
Chance Flood Hazard Zone X
Area with Reduced Flood Risk due to
Levee. See Notes. Zone X
Area with Flood Risk due to LeveeZone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood Hazard Zone D
Channel, Culvert, or Storm Sewer
Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline
Profile Baseline
Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study
Jurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This map complies with FEMA's standards for the use of
digital flood maps if it is not void as described below.
The basemap shown complies with FEMA's basemap
accuracy standards
The flood hazard information is derived directly from the
authoritative NFHL web services provided by FEMA. This map
was exported on 9/9/2025 at 3:29 PM and does not
reflect changes or amendments subsequent to this date and
time. The NFHL and effective information may change or
become superseded by new data over time.
This map image is void if the one or more of the following map
elements do not appear: basemap imagery, flood zone labels,
legend, scale bar, map creation date, community identifiers,
FIRM panel number, and FIRM effective date. Map images for
unmapped and unmodernized areas cannot be used for
regulatory purposes.
Legend
OTHER AREAS OF
FLOOD HAZARD
OTHER AREAS
GENERAL
STRUCTURES
OTHER
FEATURES
MAP PANELS
8
B 20.2
The pin displayed on the map is an approximate
point selected by the user and does not represent
an authoritative property location.
1:6,000
80°30'54"W 34°4'17"N
80°30'16"W 34°3'48"N
Basemap Imagery Source: USGS National Map 2023
Borden
U.S. Fish and Wildlife Service, National Standards and Support Team,
wetlands_team@fws.gov
Wetlands
Estuarine and Marine Deepwater
Estuarine and Marine Wetland
Freshwater Emergent Wetland
Freshwater Forested/Shrub Wetland
Freshwater Pond
Lake
Other
Riverine
September 9, 2025
0 0.1 0.20.05 mi
0 0.2 0.40.1 km
1:7,523
This page was produced by the NWI mapper
National Wetlands Inventory (NWI)
This map is for general reference only. The US Fish and Wildlife
Service is not responsible for the accuracy or currentness of the
base data shown on this map. All wetlands related data should
be used in accordance with the layer metadata found on the
Wetlands Mapper web site.
Soil Map—Sumter County, South Carolina
(b8840f18-9019-11f0-95a3-eb93979c98bf)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/12/2025
Page 1 of 3
3769590 3769620 3769650 3769680 3769710 3769740 3769770 3769800 3769830 3769860 3769890
3769590 3769620 3769650 3769680 3769710 3769740 3769770 3769800 3769830 3769860 3769890
545140 545170 545200 545230 545260 545290 545320 545350
545140 545170 545200 545230 545260 545290 545320 545350
34° 4' 7'' N
80° 30' 39'' W
34° 4' 7'' N
80° 30' 30'' W
34° 3' 57'' N
80° 30' 39'' W
34° 3' 57'' N
80° 30' 30'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 17N WGS84
0 50 100 200 300
Feet
0 20 40 80 120
Meters
Map Scale: 1:1,500 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Sumter County
, South Carolina
Survey Area Data: Version 22, Aug 29, 2024
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Apr 15, 2022—May
10, 2022
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Soil Map—Sumter County, South Carolina
(b8840f18-9019-11f0-95a3-eb93979c98bf)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/12/2025
Page 2 of 3
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
DoB Dothan-Norfolk complex, 2 to 6
percent slopes
0.3 100.0%
Totals for Area of Interest 0.3 100.0%
Soil Map—Sumter County, South Carolina b8840f18-9019-11f0-95a3-
eb93979c98bf
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/12/2025
Page 3 of 3
U.S. Fish and Wildlife Service
National Wildlife Refuge System Map
North
USFWS – Wildlife Refuge Map
Harmoni Towers LLC – Borden
Camden Highway
Rembert, South Carolina 29128
Site Location
North American Migration Flyways
North
Migratory Bird Flyways – Location Map
Harmoni Towers LLC – Borden
Camden Highway
Rembert, South Carolina 29128
Site Location
National Park Service
National Historic Trails and Scenic Routes
North
National Park Service – Trails and Routes Map
Harmoni Towers LLC – Borden
Camden Highway
Rembert, South Carolina 29128
Site Location
Bureau of Indian Affairs
Indian Reservation Map
North
Bureau of Indian Affairs – Reservation Map
Harmoni Towers LLC – Borden
Camden Highway
Rembert, South Carolina 29128
Site Location
Appendix C
Site Photographs
Site Photograph 1 – Looking north at the Site
Site Photograph 2 – Looking south at the Site
Site Photographs
Harmoni Towers LLC – Borden
Camden Highway
Rembert, South Carolina 29128
Photographed:
September 26, 2025
Site Photograph 3 – Looking east at the Site
Site Photograph 4 – Looking west at the Site
Site Photographs
Harmoni Towers LLC – Borden
Camden Highway
Rembert, South Carolina 29128
Photographed:
September 26, 2025
Site Photograph 5 – Looking north away from the Site
Site Photograph 6 – Looking south away from the Site
Site Photographs
Harmoni Towers LLC – Borden
Camden Highway
Rembert, South Carolina 29128
Photographed:
September 26, 2025
Site Photograph 7 – Looking east away from the Site
Site Photograph 8 – Looking west away from the Site
Site Photographs
Harmoni Towers LLC – Borden
Camden Highway
Rembert, South Carolina 29128
Photographed:
September 26, 2025
Site Photograph 9 – Looking south along the access/utility easement
Site Photograph 10 – Looking northeast away from the access/utility easement
Site Photographs
Harmoni Towers LLC – Borden
Camden Highway
Rembert, South Carolina 29128
Photographed:
September 26, 2025
Appendix D
Documentation of Officially Designated
Wilderness Areas, Wildlife Preserves and
Endangered Species
United States Department of the Interior
FISH AND WILDLIFE SERVICE
176 Croghan Spur Road, Suite 200
Charleston, South Carolina 29407
U.S. Fish and Wildlife Service Clearance Letter for Species and Habitat Assessments
Updated: January 3, 2023
The U.S. Fish and Wildlife Service (Service) is one of two lead Federal Agencies mandated with
the protection and conservation of Federal trust resources, including threatened and endangered
(T&E) species and designated critical habitat as listed under the Endangered Species Act of 1973
(16 U.S.C. 1531 et seq.) (ESA). Development of lands in So uth Carolina have the potential to
impact federally protected species. Accord ingly, obligations under the ESA, National
Environmental Policy Act (NEPA), Clean Water Act (CWA), Federal Power Act (FPA), and
other laws, require project proponents to perform an environmental impact review prior to
performing work on the site. These projects may include a wide variety of activities including,
but not limited to, residential or commercial developments, energy production, power
transmission, transportation, infrastructure repair, maintenance, or reconstruction of existing
facilities on previously developed land.
Project applicants, or their designated representatives, may perform initial species assessments in
advance of specific development proposals to determine the presence of T&E species and
designated critical habitat that are protected under the ESA. These reviews are purposely
speculative and do not include specific project or site development plans. Many of these
speculative proposals are for previously developed or disturbed lands such as pasture lands,
agricultural fields, or abandoned industrial facilities. Due to historical uses and existing
conditions, these sites often do not contain suitable habitat to support T&E species. Therefore,
an assessment may conclude that any future development of the site would have no effect to
T&E species or adversely modify designated critical habitat. If the applicant, or their designee,
determines there is no effect or impact to federally protected species or designated critical
habitat, no further action is required under the ESA.
Clearance to Proceed
For all sites with potential projects that have no effect or impact upon federally protected species
or designated critical habitat, no further coordination with the Service is necessary at this time.
This letter may be downloaded and serve as the Service’s concurrence or agreement to the
conclusions of the species assessment. Any protected species survey or assessment conducted
for the property should be included with this letter when submitting the project to Federal
permitting agencies. Due to obligations under the ESA potential impacts must be reconsidered
if: (1) new information reveals impacts of this identified action may affect any listed species or
critical habitat in a manner not previously considered; (2) this action is subsequently modified in
a manner which was not considered in this assessment; or (3) a new species is listed or critical
habitat is designated that may be affected by the identified action.
Please note this Clearance Letter applies only to assessments in South Carolina and may
not be used to satisfy section 7 requirements for projects that have already been completed
or currently under construction.
If suitable habitat for T&E species or designated critical habitat occurs on, or nearby, the project
site, a determination of no effect/impact may not be appropriate. In these cases, direct
consultation requests with the Service should be initiated by the Federal action agency.
Additional coordination with the Service may also be required if the potential project requires an
evaluation under another resource law such as, but not limited to, NEPA, CWA, FPA, and the
Coastal Zone Management Act.
The Service appreciates your cooperation in the protection of federally listed species and their
habitats in South Carolina.
Thomas D. McCoy
Field Supervisor
Sincerely,
2
Informal B iological Assessment
Harmoni Towers, LLC
Project Name: Borden / Client #SC0009812 - Trileaf #7 72 867
Latitude: 34° 4’ 2.5869” N, Longitude: 80° 30’ 34.8467” W
Trileaf performed an Informal Biological Assessment for the subject site. The purpose is to
docum
ent whether the proposed undertaking will affect listed or proposed threatened or
endangered species , designated critical habitat s, wetlands, and migratory birds. A project
description, site photographs , topogr aphical maps, wetland maps, and soil maps a re included in
this report.
Proposed Project Description:
The Site is l ocated at C amden Highway, Rembert, Sumter County, South Carolina 29128, and
cons
ists of the construction of a 279-foot Se lf-Support Communications Tower, with an overall
hei
ght of 283 feet and associated equipment wit hin a 50-foot by 50-foot fenced area within a 75-
foot by 75-foot (5,625-square-foot) lease area. T he project i ncludes a 12-foot-wide gravel drive
within an access/utilit y easement, measuring 30 fee t wide, extending approximately 20 feet
gene
rally northeast away from the lease area towards Camden Highway. The proposed
acc
ess/utility easement and tower compound lease area are located wit h an agricultur al field. The
proposed structure site is approximately 241.79 feet above mean sea level.
Site and Surrounding Habitat:
The Site is currently located w ithin an agricultural field. Dur ing the area reconnaissance, no trees
along the access road, and generally throughout the ar ea were identified to be removed.
The surrounding habitat within a 0.5-m ile radius of the proposed site consists predominantly
of
agricultural development and wooded land. To the north is Camden Highway, followed by
wooded land interspersed with rural residences, followed by Dais Road, followed by additional
wooded land. To the east is Camden Highway, followed by wooded land interspersed with
rural residences, followed by additional wooded land. To the south is agricultural
development interspersed with rural residences. To the west is an agricultural field, followed
by
wooded land, followed by residential development, followed by Dennis Road, followed
by additional wooded land. The current habitat is not mapped as critical habitat, nor does it
qualify as sufficient habitat for Federal or State listed species.
Wetlands:
Trileaf has reviewed the topographic map, soil composition, as well as the National Wetlands
Inventory Map to determine if the proposed lease area and easements would have an impact
on any wetlands or require significant amounts of fill or grading. Trileaf determined that the
site is not located in a recognized national wetland area.
Trileaf
performed a field visit and identified surface water bodies. Using local maps in combination
with an area reconnaissance the
following water bodies have been identified in the table below:
Borden
Trileaf #772867
Water Body Type Water Body
Name
Direction from
Structure
Distance from
Structure
Freshwater Forested Shrub
Wetland Unnamed WNW 0.10 miles
Stream Unnamed WNW 0.16 miles
Stream Unnamed ESE 0.18 miles
Freshwater Forested Shrub
Wetland Unnamed SW 0.19 miles
Freshwater Forested Shrub
Wetland Unnamed N 0.42 miles
Stream Unnamed ESE 0.49 miles
Freshwater Forested Shrub
Wetland Unnamed E 0.49 miles
Migratory Birds:
The proposed Site and design process for this project could not conform to all the USFWS
recommendations to decrease potential effects on migratory birds. Therefore, it has included
mitigating factors such as structure placement within minimally sensitive areas, avoiding
placement near wetlands and large water bodies, and eliminating the need for guy wires. While the
proposed Site is located near the Atlantic flyway, our site investigation has determined that the
project area is not located in an NWI mapped wetland, waterway, wildlife refuge, national
wilderness area, native grassland or forest area, ridgeline, mountain top, coastline or area
commonly known to have high incidences of fog or low clouds, where migratory birds may be
found. Based upon the efforts undertaken during this IBA as well as the current data made
available, we have concluded that this project will not have a significant effect on migratory birds;
however, the presence of migratory birds cannot be ruled out.
Soils:
According to the U.S. Department of Agriculture Natural Resources Conservation Service Web
Soil Survey of Sumter County, South Carolina, the Site is underlain by Dothan-Norfolk complex,
2 to 6 percent slopes . Dothan soils consist of well drained soils that are formed from l oamy
fluviomarine deposits and are found in marine terraces. The depth to the most restrictive feature is
32 to 55 inches to plinthite. The depth to the water table is about 40 to 58 inches. A typical profile
of Dothan soil consists of a surface layer of loamy sand extending from 0 to 8 inches and two (2)
distinct subsurface layers of sandy clay loam extending from 8 to 80 inches. Dothan soils have no
frequency of flooding or ponding.
Norfolk soils consist of well drained soils that are formed from loamy fluviomarine deposits and
are found in marine terraces. The depth to the most restrictive feature is 61 to 69 inches to plinthite.
The depth to the water table is about 40 to 68 inches. A typical profile of Norfolk soil consists of
a surface layer of loamy sand extending from 0 to 9 inches, subsur face layers of loamy sand
extending from 9 to 11 inches, and two (2) distinct layers of sandy clay loam extending from 11
to 80 inches. Norfolk soils have no frequency of flooding or ponding.
Dothan-Norfolk complex, 2 to 6 percent slopes, is not considered a hydric soil, and no hydrophytic
vegetation or surface water was observed.
Borden
Trileaf #772867
Threatened or Endangered Species:
Trileaf has researched the listed or proposed threatened or endangered species and designated
critical habitat for the project area. This includes any such species that have been reported to exist
within the action area where the project is located. The list of federally threatened or endangered
species was acquired through the U.S. Fish and Wildlife Service's Information, Planning, and
Consultation system (IPaC) and is site specific. The state list of threatened or endangered species
was acquired from The South Carolina Department of Natural Resources (SCDNR). The lease area
is not located within an aquatic environment; therefore, any obligate aquatic species should not be
directly impacted by this project and are not included in the table below. A list of remaining species
and site observations are summarized in the following table:
Species /
Resource Name
Federal / State
Status Habitat Description Recommendation
of Effect
Notes /
Documentation
Tricolored Bat
(Perimyotis
subflavus)
Federal-
Proposed
Endangered
Foliage or in high tree
cavities and crevices
preferring edge habitats
near areas of mixed
agricultural use
No effect
Habitat assessment
indicated no
potential habitat
present
Red-cockaded
Woodpecker
(Picoides
borealis)
Federal-
Threatened
State-
Endangered
Open pine forest
maintained by frequent
fires, especially mature
longleaf pine forests
No effect
Habitat assessment
indicated no
potential habitat
present
Southern
Hognose Snake
(Heterodon
simus)
Federal-
Proposed
Threatened
State-
Threatened
Sandhills, fallow fields, and
longleaf pine-turkey oak;
xeric sandy habitats such as
pine flatwoods, sand ridges,
and coastal dunes; may
persist in agricultural or
suburban areas with suitable
sandy soils
No effect
Habitat assessment
indicated no
potential habitat
present
Monarch
Butterfly
(Danaus
plexippus)
Federal-
Proposed
Threatened
Breeding habitat must
contain milkweeds.
Adults can be found
in a variety of sunny,
open spaces, both
natural and disturbed
No effect
Habitat assessment
indicated no
potential habitat
present
Borden
Trileaf #772867
Species /
Resource Name
Federal / State
Status Habitat Description Recommendation
of Effect
Notes /
Documentation
American
Chaffseed
(Schwalbea
americana)
Federal-
Endangered
Open, moist pine flatwoods;
fire-maintained savannas,
ecotonal areas between
peaty wetlands; xeric sandy
soils
No effect
Habitat assessment
indicated no
potential habitat
present
Canby’s
Dropwort
(Oxypolis canbyi)
Federal-
Endangered
Wetlands with acidic
organic soils and patchy or
no canopy cover
No effect
Habitat assessment
indicated no
potential habitat
present
Spotted Turtle
(Clemmys
guttata)
State-
Threatened
Heavily vegetated, shallow
wetlands with standing or
slowly flowing water; bays,
bogs, swamps, marshes, wet
meadows, and even tidally-
influenced brackish streams
No effect
Habitat assessment
indicated no
potential habitat
present
Rafinesque's Big-
eared Bat
(Corynorhinus
rafinesquii)
State-
Endangered
Mature forests, including
bottomland and upland
hardwoods and pine
flatwoods with water
nearby; roosting sites are
usually dimly lit sheltered
areas, such as dilapidated
buildings, bridges, hollow
trees, loose bark, rock
shelters, and the entrance
zones of caves and mines
No effect
Habitat assessment
indicated no
potential habitat
present
Swallow-tailed
Kite
(Elanoides
forficatus)
State-
Endangered
Breed in swamps, lowland
forests, and marshes;
nesting and foraging habitat
includes slash pine
wetlands, edges of pine
forest, cypress swamps, wet
prairies, freshwater and
brackish marshes,
hardwood hammocks, and
mangrove forests
No effect
Habitat assessment
indicated no
potential habitat
present
Borden
Trileaf #772867
Species /
Resource Name
Federal / State
Status Habitat Description Recommendation
of Effect
Notes /
Documentation
Bald Eagle
(Haliaeetus
leucocephalus)
State-Threatened
Areas close to coastal areas,
bays, rivers, lakes; nest in
tall trees (mostly pine) that
provide clear view of
surrounding area
No effect
Habitat assessment
indicated no
potential habitat
present
Carolina Gopher
Frog
(Lithobates
capito)
State-
Endangered
Burrows of the gopher
tortoise (Gopherus
polyphemus), stump holes,
root tunnels and mammal
and crayfish burrows;
breeding sites are upland
ephemeral ponds in longleaf
pine savannas
No effect
Habitat assessment
indicated no
potential habitat
present
Least Tern
(Sternula
antillarum)
State-
Threatened
Nest in colonies on sandy,
shelly beaches or islands on
coastlines and rivers;
sometimes also nest in
gravel pits, on dredge spoil,
on flat gravel rooftops, or
on dry mudflats
No effect
Habitat assessment
indicated no
potential habitat
present
Conclusions:
Based on the efforts undertaken during our IBA, project specifications, and the current data made
available, we have concluded that there is no potential for the proposed project to have a significant
effect on listed or proposed, threatened and endangered species, their designated critical habitat,
or migratory birds.
It should be noted that this informal biological assessment was conducted in accordance with the
Scope of Work and does not constitute a Section 7 Biological Assessment under the Endangered
Species Act (50 CFR Part 402.01).
Hannah Dell
Natural Resource Specialist
Please refer to Appendix B for Site Maps
Please refer to Appendix C for Site Photographs
Please refer to Appendix B for Site Maps
Sumter County, South Carolina
DoB—Dothan-Norfolk complex, 2 to 6 percent slopes
Map Unit Setting
National map unit symbol: 2pfs7
Elevation: 180 to 300 feet
Mean annual precipitation: 42 to 55 inches
Mean annual air temperature: 51 to 75 degrees F
Frost-free period: 202 to 253 days
Farmland classification: All areas are prime farmland
Map Unit Composition
Dothan and similar soils: 59 percent
Norfolk and similar soils: 41 percent
Estimates are based on observations, descriptions, and transects of
the mapunit.
Description of Dothan
Setting
Landform: Marine terraces
Landform position (two-dimensional): Summit, shoulder, backslope
Landform position (three-dimensional): Interfluve
Down-slope shape: Convex, linear
Across-slope shape: Convex, linear
Parent material: Loamy fluviomarine deposits
Typical profile
Ap - 0 to 8 inches: loamy sand
Bt - 8 to 37 inches: sandy clay loam
Btv - 37 to 80 inches: sandy clay loam
Properties and qualities
Slope: 2 to 6 percent
Depth to restrictive feature: 32 to 55 inches to plinthite
Drainage class: Well drained
Runoff class: Medium
Capacity of the most limiting layer to transmit water
(Ksat): Moderately high (0.20 to 0.57 in/hr)
Depth to water table: About 40 to 58 inches
Frequency of flooding: None
Frequency of ponding: None
Available water supply, 0 to 60 inches: Low (about 4.9 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 2e
Hydrologic Soil Group: C
Hydric soil rating: No
Map Unit Description: Dothan-Norfolk complex, 2 to 6 percent slopes---Sumter County, South
Carolina
b8840f18-9019-11f0-95a3-
eb93979c98bf
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/12/2025
Page 1 of 2
Description of Norfolk
Setting
Landform: Marine terraces
Landform position (two-dimensional): Summit, shoulder, backslope
Landform position (three-dimensional): Interfluve
Down-slope shape: Linear
Across-slope shape: Convex
Parent material: Loamy fluviomarine deposits
Typical profile
Ap - 0 to 9 inches: loamy sand
E - 9 to 11 inches: loamy sand
Bt - 11 to 61 inches: sandy clay loam
Btv - 61 to 80 inches: sandy clay loam
Properties and qualities
Slope: 2 to 6 percent
Depth to restrictive feature: 61 to 69 inches to plinthite
Drainage class: Well drained
Runoff class: Medium
Capacity of the most limiting layer to transmit water
(Ksat): Moderately high (0.20 to 0.57 in/hr)
Depth to water table: About 40 to 68 inches
Frequency of flooding: None
Frequency of ponding: None
Available water supply, 0 to 60 inches: Moderate (about 7.8
inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 2e
Hydrologic Soil Group: B
Hydric soil rating: No
Data Source Information
Soil Survey Area: Sumter County, South Carolina
Survey Area Data: Version 22, Aug 29, 2024
Map Unit Description: Dothan-Norfolk complex, 2 to 6 percent slopes---Sumter County, South
Carolina
b8840f18-9019-11f0-95a3-
eb93979c98bf
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
9/12/2025
Page 2 of 2
09/30/2025 22:22:01 UTC
United States Department of the Interior
FISH AND WILDLIFE SERVICE
South Carolina Ecological Services
176 Croghan Spur Road, Suite 200
Charleston, SC 29407-7558
Phone: (843) 727-4707 Fax: (843) 727-4218
In Reply Refer To:
Project Code: 2025-0157205
Project Name: Borden
Subject: List of threatened and endangered species that may occur in your proposed project
location or may be affected by your proposed project
To Whom It May Concern:
The enclosed species list identifies threatened, endangered, proposed and candidate species, as
well as proposed and final designated critical habitat, that may occur within the boundary of your
proposed project and/or may be affected by your proposed project. The species list fulfills the
requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the
Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.).
New information based on updated surveys, changes in the abundance and distribution of
species, changed habitat conditions, or other factors could change this list. Please feel free to
contact us if you need more current information or assistance regarding the potential impacts to
federally proposed, listed, and candidate species and federally designated and proposed critical
habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the
Act, the accuracy of this species list should be verified after 90 days. This verification can be
completed formally or informally as desired. The Service recommends that verification be
completed by visiting the IPaC website at regular intervals during project planning and
implementation for updates to species lists and information. An updated list may be requested
through the IPaC system by completing the same process used to receive the enclosed list.
The purpose of the Act is to provide a means whereby threatened and endangered species and the
ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the
Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to
utilize their authorities to carry out programs for the conservation of threatened and endangered
species and to determine whether projects may affect threatened and endangered species and/or
designated critical habitat.
A Biological Assessment is required for construction projects (or other undertakings having
similar physical impacts) that are major Federal actions significantly affecting the quality of the
human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2)
(c)). For projects other than major construction activities, the Service suggests that a biological
Project code: 2025-0157205 09/30/2025 22:22:01 UTC
2 of 10
▪
evaluation similar to a Biological Assessment be prepared to determine whether the project may
affect listed or proposed species and/or designated or proposed critical habitat. Recommended
contents of a Biological Assessment are described at 50 CFR 402.12.
If a Federal agency determines, based on the Biological Assessment or biological evaluation, that
listed species and/or designated critical habitat may be affected by the proposed project, the
agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service
recommends that candidate species, proposed species and proposed critical habitat be addressed
within the consultation. More information on the regulations and procedures for section 7
consultation, including the role of permit or license applicants, can be found in the "Endangered
Species Consultation Handbook" at:
https://www.fws.gov/sites/default/files/documents/endangered-species-consultation-
handbook.pdf
Migratory Birds: In addition to responsibilities to protect threatened and endangered species
under the Endangered Species Act (ESA), there are additional responsibilities under the
Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA) to
protect native birds from project-related impacts. Any activity resulting in take of migratory
birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife
Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). For more information regarding these
Acts, see https://www.fws.gov/program/migratory-bird-permit/what-we-do.
It is the responsibility of the project proponent to comply with these Acts by identifying potential
impacts to migratory birds and eagles within applicable NEPA documents (when there is a
federal nexus) or a Bird/Eagle Conservation Plan (when there is no federal nexus). Proponents
should implement conservation measures to avoid or minimize the production of project-related
stressors or minimize the exposure of birds and their resources to the project-related stressors.
For more information on avian stressors and recommended conservation measures, see https://
www.fws.gov/library/collections/threats-birds.
In addition to MBTA and BGEPA, Executive Order 13186: Responsibilities of Federal Agencies
to Protect Migratory Birds, obligates all Federal agencies that engage in or authorize activities
that might affect migratory birds, to minimize those effects and encourage conservation measures
that will improve bird populations. Executive Order 13186 provides for the protection of both
migratory birds and migratory bird habitat. For information regarding the implementation of
Executive Order 13186, please visit https://www.fws.gov/partner/council-conservation-
migratory-birds.
We appreciate your concern for threatened and endangered species. The Service encourages
Federal agencies to include conservation of threatened and endangered species into their project
planning to further the purposes of the Act. Please include the Consultation Code in the header of
this letter with any request for consultation or correspondence about your project that you submit
to our office.
Attachment(s):
Official Species List
Project code: 2025-0157205 09/30/2025 22:22:01 UTC
3 of 10
▪
▪
▪
USFWS National Wildlife Refuges and Fish Hatcheries
Bald & Golden Eagles
Migratory Birds
OFFICIAL SPECIES LIST
This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the
requirement for Federal agencies to "request of the Secretary of the Interior information whether
any species which is listed or proposed to be listed may be present in the area of a proposed
action".
This species list is provided by:
South Carolina Ecological Services
176 Croghan Spur Road, Suite 200
Charleston, SC 29407-7558
(843) 727-4707
Project code: 2025-0157205 09/30/2025 22:22:01 UTC
4 of 10
PROJECT SUMMARY
Project Code: 2025-0157205
Project Name: Borden
Project Type: Communication Tower New Construction
Project Description: Our client proposes to construct a 279-foot Self-Support Communications
Tower, with an overall height of 283 feet and associated equipment within
a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-
square-foot) lease area. The project includes a 12-foot-wide gravel drive
within an access/utility easement, measuring 30 feet wide, extending
approximately 20 feet generally northeast away from the lease area
towards Camden Highway. The proposed access/utility easement and
tower compound lease area are located with an agricultural field.
Project Location:
The approximate location of the project can be viewed in Google Maps:
https://
www.google.com/maps/@34.0674004,-80.50967575061141,14z
Counties: Sumter County, South Carolina
Project code: 2025-0157205 09/30/2025 22:22:01 UTC
5 of 10
1.
ENDANGERED SPECIES ACT SPECIES
There is a total of 6 threatened, endangered, or candidate species on this species list.
Species on this list should be considered in an effects analysis for your project and could include
species that exist in another geographic area. For example, certain fish may appear on the species
list because a project could affect downstream species.
IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA
Fisheries , as USFWS does not have the authority to speak on behalf of NOAA and the
Department of Commerce.
See the "Critical habitats" section below for those critical habitats that lie wholly or partially
within your project area under this office's jurisdiction. Please contact the designated FWS office
if you have questions.
NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an
office of the National Oceanic and Atmospheric Administration within the Department of
Commerce.
1
Project code: 2025-0157205 09/30/2025 22:22:01 UTC
6 of 10
MAMMALS
NAME STATUS
Tricolored Bat Perimyotis subflavus
No critical habitat has been designated for this species.
Species profile: https://ecos.fws.gov/ecp/species/10515
General project design guidelines:
https://ipac.ecosphere.fws.gov/project/L2PX35QZ2ZFS3OZ6FSMH3GM65A/documents/
generated/9721.pdf
Proposed
Endangered
BIRDS
NAME STATUS
Red-cockaded Woodpecker Dryobates borealis
No critical habitat has been designated for this species.
Species profile: https://ecos.fws.gov/ecp/species/7614
Threatened
REPTILES
NAME STATUS
Southern Hognose Snake Heterodon simus
No critical habitat has been designated for this species.
Species profile: https://ecos.fws.gov/ecp/species/3248
Proposed
Threatened
INSECTS
NAME STATUS
Monarch Butterfly Danaus plexippus
There is proposed critical habitat for this species. Your location does not overlap the critical
habitat.
Species profile:
https://ecos.fws.gov/ecp/species/9743
Proposed
Threatened
FLOWERING PLANTS
NAME STATUS
American Chaffseed Schwalbea americana
No critical habitat has been designated for this species.
Species profile: https://ecos.fws.gov/ecp/species/1286
General project design guidelines:
https://ipac.ecosphere.fws.gov/project/L2PX35QZ2ZFS3OZ6FSMH3GM65A/documents/
generated/9753.pdf
Endangered
Canby's Dropwort Oxypolis canbyi
No critical habitat has been designated for this species.
Species profile:
https://ecos.fws.gov/ecp/species/7738
General project design guidelines:
https://ipac.ecosphere.fws.gov/project/L2PX35QZ2ZFS3OZ6FSMH3GM65A/documents/
generated/9753.pdf
Endangered
Project code: 2025-0157205 09/30/2025 22:22:01 UTC
7 of 10
1.
2.
3.
CRITICAL HABITATS
THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S
JURISDICTION.
YOU ARE STILL REQUIRED TO DETERMINE IF YOUR PROJECT(S) MAY HA VE EFFECTS ON ALL
ABOVE LISTED SPECIES.
USFWS NATIONAL WILDLIFE REFUGE LANDS
AND FISH HATCHERIES
Any activity proposed on lands managed by the
National Wildlife Refuge system must undergo a
'Compatibility Determination' conducted by the Refuge. Please contact the individual Refuges to
discuss any questions or concerns.
THERE ARE NO REFUGE LANDS OR FISH HATCHERIES WITHIN YOUR PROJECT AREA.
BALD & GOLDEN EAGLES
Bald and Golden Eagles are protected under the Bald and Golden Eagle Protection Act and the
Migratory Bird Treaty Act (MBTA) . Any person or organization who plans or conducts
activities that may result in impacts to Bald or Golden Eagles, or their habitats, should follow
appropriate regulations and consider implementing appropriate avoidance and minimization
measures, as described in the various links on this page.
The
Bald and Golden Eagle Protection Act of 1940.
The Migratory Birds Treaty Act of 1918.
50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)
Bald and Golden Eagles are protected under the Bald and Golden Eagle Protection Act and the
Migratory Bird Treaty Act (MBTA). Any person or organization who plans or conducts activities
that may result in impacts to Bald or Golden Eagles, or their nests, should follow appropriate
regulations and implement required avoidance and minimization measures, as described in the
various links on this page.
The data in this location indicates that no eagles have been observed in this area. This does not
mean eagles are not present in your project area, especially if the area is difficult to survey.
Please review the 'Steps to Take When No Results Are Returned' section of the Supplemental
Information on Migratory Birds and Eagles document to determine if your project is in a poorly
surveyed area. If it is, you may need to rely on other resources to determine if eagles may be
present (e.g. your local FWS field office, state surveys, your own surveys).
Any person or organization who plans or conducts activities that may result in impacts to bald or
golden eagles, or their habitats, should follow appropriate regulations and consider implementing
2
1
Project code: 2025-0157205 09/30/2025 22:22:01 UTC
8 of 10
1.
2.
3.
appropriate conservation measures, as described in the links below. Specifically, please review
the ''Supplemental Information on Migratory Birds and Eagles''.
MIGRATORY BIRDS
The Migratory Bird Treaty Act (MBTA) prohibits the take (including killing, capturing, selling,
trading, and transport) of protected migratory bird species without prior authorization by the
Department of Interior U.S. Fish and Wildlife Service (Service).
The Migratory Birds Treaty Act of 1918.
The Bald and Golden Eagle Protection Act of 1940.
50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)
For guidance on when to schedule activities or implement avoidance and minimization measures
to reduce impacts to migratory birds on your list, see the "Probability of Presence Summary"
below to see when these birds are most likely to be present and breeding in your project area.
NAME
BREEDING SEASON
American Kestrel Falco sparverius paulus
This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation
Regions (BCRs) in the continental USA
https://ecos.fws.gov/ecp/species/9587
Breeds Apr 1 to Aug
31
Painted Bunting Passerina ciris
This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation
Regions (BCRs) in the continental USA
https://ecos.fws.gov/ecp/species/9511
Breeds Apr 25 to Aug
15
PROBABILITY OF PRESENCE SUMMARY
The graphs below provide our best understanding of when birds of concern are most likely to be
present in your project area. This information can be used to tailor and schedule your project
activities to avoid or minimize impacts to birds. Please make sure you read
"Supplemental
Information on Migratory Birds and Eagles", specifically the FAQ section titled "Proper
Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret
this report.
Probability of Presence (
)
Green bars; the bird's relative probability of presence in the 10km grid cell(s) your project
overlaps during that week of the year.
Breeding Season ( )
Yellow bars; liberal estimate of the timeframe inside which the bird breeds across its entire
range.
1
Project code: 2025-0157205 09/30/2025 22:22:01 UTC
9 of 10
▪
▪
▪
▪
no data survey effort breeding season probability of presence
Survey Effort ( )
Vertical black lines; the number of surveys performed for that species in the 10km grid cell(s)
your project area overlaps.
No Data ( )
A week is marked as having no data if there were no survey events for that week.
SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
American Kestrel
BCC - BCR
Painted Bunting
BCC - BCR
Additional information can be found using the following links:
Eagle Management https://www.fws.gov/program/eagle-management
Measures for avoiding and minimizing impacts to birds https://www.fws.gov/library/
collections/avoiding-and-minimizing-incidental-take-migratory-birds
Nationwide avoidance and minimization measures for birds
Supplemental Information for Migratory Birds and Eagles in IPaC https://www.fws.gov/
media/supplemental-information-migratory-birds-and-bald-and-golden-eagles-may-occur-
project-action
Project code: 2025-0157205 09/30/2025 22:22:01 UTC
10 of 10
IPAC USER CONTACT INFORMATION
Agency: Trileaf Corporation
Name: Hannah Dell
Address: 1775 The Exchange SE
Address Line 2: Suite 525
City: Marietta
State: GA
Zip: 30339
Email h.dell@trileaf.com
Phone: 7063621745
01/22/2026 13:32:54 UTC
United States Department of the Interior
FISH AND WILDLIFE SERVICE
South Carolina Ecological Services
176 Croghan Spur Road, Suite 200
Charleston, SC 29407-7558
Phone: (843) 727-4707 Fax: (843) 727-4218
In Reply Refer To:
Project Code: 2025-0157205
Project Name: Borden
Subject: List of threatened and endangered species that may occur in your proposed project
location or may be affected by your proposed project
To Whom It May Concern:
The enclosed species list identifies threatened, endangered, proposed and candidate species, as
well as proposed and final designated critical habitat, that may occur within the boundary of your
proposed project and/or may be affected by your proposed project. The species list fulfills the
requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the
Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.).
New information based on updated surveys, changes in the abundance and distribution of
species, changed habitat conditions, or other factors could change this list. Please feel free to
contact us if you need more current information or assistance regarding the potential impacts to
federally proposed, listed, and candidate species and federally designated and proposed critical
habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the
Act, the accuracy of this species list should be verified after 90 days. This verification can be
completed formally or informally as desired. The Service recommends that verification be
completed by visiting the IPaC website at regular intervals during project planning and
implementation for updates to species lists and information. An updated list may be requested
through the IPaC system by completing the same process used to receive the enclosed list.
The purpose of the Act is to provide a means whereby threatened and endangered species and the
ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the
Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to
utilize their authorities to carry out programs for the conservation of threatened and endangered
species and to determine whether projects may affect threatened and endangered species and/or
designated critical habitat.
A Biological Assessment is required for construction projects (or other undertakings having
similar physical impacts) that are major Federal actions significantly affecting the quality of the
human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2)
(c)). For projects other than major construction activities, the Service suggests that a biological
Project code: 2025-0157205 01/22/2026 13:32:54 UTC
2 of 10
▪
evaluation similar to a Biological Assessment be prepared to determine whether the project may
affect listed or proposed species and/or designated or proposed critical habitat. Recommended
contents of a Biological Assessment are described at 50 CFR 402.12.
If a Federal agency determines, based on the Biological Assessment or biological evaluation, that
listed species and/or designated critical habitat may be affected by the proposed project, the
agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service
recommends that candidate species, proposed species and proposed critical habitat be addressed
within the consultation. More information on the regulations and procedures for section 7
consultation, including the role of permit or license applicants, can be found in the "Endangered
Species Consultation Handbook" at:
https://www.fws.gov/sites/default/files/documents/endangered-species-consultation-
handbook.pdf
Migratory Birds: In addition to responsibilities to protect threatened and endangered species
under the Endangered Species Act (ESA), there are additional responsibilities under the
Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA) to
protect native birds from project-related impacts. Any activity resulting in take of migratory
birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife
Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). For more information regarding these
Acts, see https://www.fws.gov/program/migratory-bird-permit/what-we-do.
It is the responsibility of the project proponent to comply with these Acts by identifying potential
impacts to migratory birds and eagles within applicable NEPA documents (when there is a
federal nexus) or a Bird/Eagle Conservation Plan (when there is no federal nexus). Proponents
should implement conservation measures to avoid or minimize the production of project-related
stressors or minimize the exposure of birds and their resources to the project-related stressors.
For more information on avian stressors and recommended conservation measures, see https://
www.fws.gov/library/collections/threats-birds.
In addition to MBTA and BGEPA, Executive Order 13186: Responsibilities of Federal Agencies
to Protect Migratory Birds, obligates all Federal agencies that engage in or authorize activities
that might affect migratory birds, to minimize those effects and encourage conservation measures
that will improve bird populations. Executive Order 13186 provides for the protection of both
migratory birds and migratory bird habitat. For information regarding the implementation of
Executive Order 13186, please visit https://www.fws.gov/partner/council-conservation-
migratory-birds.
We appreciate your concern for threatened and endangered species. The Service encourages
Federal agencies to include conservation of threatened and endangered species into their project
planning to further the purposes of the Act. Please include the Consultation Code in the header of
this letter with any request for consultation or correspondence about your project that you submit
to our office.
Attachment(s):
Official Species List
Project code: 2025-0157205 01/22/2026 13:32:54 UTC
3 of 10
▪
▪
▪
▪
USFWS National Wildlife Refuges and Fish Hatcheries
Bald & Golden Eagles
Migratory Birds
Wetlands
OFFICIAL SPECIES LIST
This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the
requirement for Federal agencies to "request of the Secretary of the Interior information whether
any species which is listed or proposed to be listed may be present in the area of a proposed
action".
This species list is provided by:
South Carolina Ecological Services
176 Croghan Spur Road, Suite 200
Charleston, SC 29407-7558
(843) 727-4707
Project code: 2025-0157205 01/22/2026 13:32:54 UTC
4 of 10
PROJECT SUMMARY
Project Code: 2025-0157205
Project Name: Borden
Project Type: Communication Tower New Construction
Project Description: Our client proposes to construct a 279-foot Self-Support Communications
Tower, with an overall height of 283 feet and associated equipment within
a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-
square-foot) lease area. The project includes a 12-foot-wide gravel drive
within an access/utility easement, measuring 30 feet wide, extending
approximately 20 feet generally northeast away from the lease area
towards Camden Highway. The proposed access/utility easement and
tower compound lease area are located with an agricultural field.
Project Location:
The approximate location of the project can be viewed in Google Maps:
https://
www.google.com/maps/@34.0673977,-80.50967833432742,14z
Counties: Sumter County, South Carolina
Project code: 2025-0157205 01/22/2026 13:32:54 UTC
5 of 10
1.
ENDANGERED SPECIES ACT SPECIES
There is a total of 6 threatened, endangered, or candidate species on this species list.
Species on this list should be considered in an effects analysis for your project and could include
species that exist in another geographic area. For example, certain fish may appear on the species
list because a project could affect downstream species.
IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA
Fisheries , as USFWS does not have the authority to speak on behalf of NOAA and the
Department of Commerce.
See the "Critical habitats" section below for those critical habitats that lie wholly or partially
within your project area under this office's jurisdiction. Please contact the designated FWS office
if you have questions.
NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an
office of the National Oceanic and Atmospheric Administration within the Department of
Commerce.
1
Project code: 2025-0157205 01/22/2026 13:32:54 UTC
6 of 10
MAMMALS
NAME STATUS
Tricolored Bat Perimyotis subflavus
No critical habitat has been designated for this species.
Species profile: https://ecos.fws.gov/ecp/species/10515
General project design guidelines:
https://ipac.ecosphere.fws.gov/project/L2PX35QZ2ZFS3OZ6FSMH3GM65A/documents/
generated/9721.pdf
Proposed
Endangered
BIRDS
NAME STATUS
Red-cockaded Woodpecker Dryobates borealis
No critical habitat has been designated for this species.
Species profile: https://ecos.fws.gov/ecp/species/7614
Threatened
REPTILES
NAME STATUS
Southern Hognose Snake Heterodon simus
No critical habitat has been designated for this species.
Species profile: https://ecos.fws.gov/ecp/species/3248
Proposed
Threatened
INSECTS
NAME STATUS
Monarch Butterfly Danaus plexippus
There is proposed critical habitat for this species. Your location does not overlap the critical
habitat.
Species profile:
https://ecos.fws.gov/ecp/species/9743
Proposed
Threatened
FLOWERING PLANTS
NAME STATUS
American Chaffseed Schwalbea americana
No critical habitat has been designated for this species.
Species profile: https://ecos.fws.gov/ecp/species/1286
General project design guidelines:
https://ipac.ecosphere.fws.gov/project/L2PX35QZ2ZFS3OZ6FSMH3GM65A/documents/
generated/9753.pdf
Endangered
Canby's Dropwort Oxypolis canbyi
No critical habitat has been designated for this species.
Species profile:
https://ecos.fws.gov/ecp/species/7738
General project design guidelines:
https://ipac.ecosphere.fws.gov/project/L2PX35QZ2ZFS3OZ6FSMH3GM65A/documents/
generated/9753.pdf
Endangered
Project code: 2025-0157205 01/22/2026 13:32:54 UTC
7 of 10
1.
2.
3.
CRITICAL HABITATS
THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S
JURISDICTION.
YOU ARE STILL REQUIRED TO DETERMINE IF YOUR PROJECT(S) MAY HA VE EFFECTS ON ALL
ABOVE LISTED SPECIES.
USFWS NATIONAL WILDLIFE REFUGE LANDS
AND FISH HATCHERIES
Any activity proposed on lands managed by the
National Wildlife Refuge system must undergo a
'Compatibility Determination' conducted by the Refuge. Please contact the individual Refuges to
discuss any questions or concerns.
THERE ARE NO REFUGE LANDS OR FISH HATCHERIES WITHIN YOUR PROJECT AREA.
BALD & GOLDEN EAGLES
Bald and Golden Eagles are protected under the Bald and Golden Eagle Protection Act and the
Migratory Bird Treaty Act (MBTA) . Any person or organization who plans or conducts
activities that may result in impacts to Bald or Golden Eagles, or their habitats, should follow
appropriate regulations and consider implementing appropriate avoidance and minimization
measures, as described in the various links on this page.
The
Bald and Golden Eagle Protection Act of 1940.
The Migratory Birds Treaty Act of 1918.
50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)
Bald and Golden Eagles are protected under the Bald and Golden Eagle Protection Act and the
Migratory Bird Treaty Act (MBTA). Any person or organization who plans or conducts activities
that may result in impacts to Bald or Golden Eagles, or their nests, should follow appropriate
regulations and implement required avoidance and minimization measures, as described in the
various links on this page.
The data in this location indicates that no eagles have been observed in this area. This does not
mean eagles are not present in your project area, especially if the area is difficult to survey.
Please review the 'Steps to Take When No Results Are Returned' section of the Supplemental
Information on Migratory Birds and Eagles document to determine if your project is in a poorly
surveyed area. If it is, you may need to rely on other resources to determine if eagles may be
present (e.g. your local FWS field office, state surveys, your own surveys).
Any person or organization who plans or conducts activities that may result in impacts to bald or
golden eagles, or their habitats, should follow appropriate regulations and consider implementing
2
1
Project code: 2025-0157205 01/22/2026 13:32:54 UTC
8 of 10
1.
2.
3.
appropriate conservation measures, as described in the links below. Specifically, please review
the ''Supplemental Information on Migratory Birds and Eagles''.
MIGRATORY BIRDS
The Migratory Bird Treaty Act (MBTA) prohibits the take (including killing, capturing, selling,
trading, and transport) of protected migratory bird species without prior authorization by the
Department of Interior U.S. Fish and Wildlife Service (Service).
The Migratory Birds Treaty Act of 1918.
The Bald and Golden Eagle Protection Act of 1940.
50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)
For guidance on when to schedule activities or implement avoidance and minimization measures
to reduce impacts to migratory birds on your list, see the "Probability of Presence Summary"
below to see when these birds are most likely to be present and breeding in your project area.
NAME
BREEDING SEASON
American Kestrel Falco sparverius paulus
This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation
Regions (BCRs) in the continental USA
https://ecos.fws.gov/ecp/species/9587
Breeds Apr 1 to Aug
31
Painted Bunting Passerina ciris
This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation
Regions (BCRs) in the continental USA
https://ecos.fws.gov/ecp/species/9511
Breeds Apr 25 to Aug
15
PROBABILITY OF PRESENCE SUMMARY
The graphs below provide our best understanding of when birds of concern are most likely to be
present in your project area. This information can be used to tailor and schedule your project
activities to avoid or minimize impacts to birds. Please make sure you read
"Supplemental
Information on Migratory Birds and Eagles", specifically the FAQ section titled "Proper
Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret
this report.
Probability of Presence (
)
Green bars; the bird's relative probability of presence in the 10km grid cell(s) your project
overlaps during that week of the year.
Breeding Season ( )
Yellow bars; liberal estimate of the timeframe inside which the bird breeds across its entire
range.
1
Project code: 2025-0157205 01/22/2026 13:32:54 UTC
9 of 10
▪
▪
▪
▪
no data survey effort breeding season probability of presence
Survey Effort ( )
Vertical black lines; the number of surveys performed for that species in the 10km grid cell(s)
your project area overlaps.
No Data ( )
A week is marked as having no data if there were no survey events for that week.
SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
American Kestrel
BCC - BCR
Painted Bunting
BCC - BCR
Additional information can be found using the following links:
Eagle Management https://www.fws.gov/program/eagle-management
Measures for avoiding and minimizing impacts to birds https://www.fws.gov/library/
collections/avoiding-and-minimizing-incidental-take-migratory-birds
Nationwide avoidance and minimization measures for birds
Supplemental Information for Migratory Birds and Eagles in IPaC https://www.fws.gov/
media/supplemental-information-migratory-birds-and-bald-and-golden-eagles-may-occur-
project-action
WETLANDS
Impacts to NWI wetlands and other aquatic habitats may be subject to regulation under Section
404 of the Clean Water Act, or other State/Federal statutes.
For more information please contact the Regulatory Program of the local U.S. Army Corps of
Engineers District.
Please note that the NWI data being shown may be out of date. We are currently working to
update our NWI data set. We recommend you verify these results with a site visit to determine
the actual extent of wetlands on site.
THERE ARE NO WETLANDS WITHIN YOUR PROJECT AREA.
Project code: 2025-0157205 01/22/2026 13:32:54 UTC
10 of 10
IPAC USER CONTACT INFORMATION
Agency: Trileaf Corporation
Name: Hannah Dell
Address: 1775 The Exchange SE
Address Line 2: Suite 525
City: Marietta
State: GA
Zip: 30339
Email h.dell@trileaf.com
Phone: 7063621745
LEAD AGENCY CONTACT INFORMATION
Lead Agency: Federal Communications Commission
01/22/2026 13:42:24 UTC
United States Department of the Interior
FISH AND WILDLIFE SERVICE
South Carolina Ecological Services
176 Croghan Spur Road, Suite 200
Charleston, SC 29407-7558
Phone: (843) 727-4707 Fax: (843) 727-4218
In Reply Refer To:
Project code: 2025-0157205
Project Name: Borden
Federal Nexus: yes
Federal Action Agency (if applicable): Federal Communications Commission
Subject: Record of project representative’s no effect determination for 'Borden'
Dear Hannah Dell:
This letter records your determination using the Information for Planning and Consultation
(IPaC) system provided to the U.S. Fish and Wildlife Service (Service) on January 22, 2026, for
'Borden' (here forward, Project). This project has been assigned Project Code 2025-0157205 and
all future correspondence should clearly reference this number. Please carefully review this
letter.
Ensuring Accurate Determinations When Using IPaC
The Service developed the IPaC system and associated species’ determination keys in accordance
with the Endangered Species Act of 1973 (ESA; 87 Stat. 884, as amended; 16 U.S.C. 1531 et
seq.) and based on a standing analysis. All information submitted by the Project proponent into
IPaC must accurately represent the full scope and details of the Project.
Failure to accurately represent or implement the Project as detailed in IPaC or the Northern
Long-eared Bat and Tricolored Bat Range-wide Determination Key (Dkey), invalidates this
letter. Answers to certain questions in the DKey commit the project proponent to
implementation of conservation measures that must be followed for the ESA determination to
remain valid.
Determination for the Northern Long-Eared Bat and/or Tricolored Bat
Based upon your IPaC submission and a standing analysis, your project has reached the
following effect determinations:
Species Listing Status Determination
Tricolored Bat (Perimyotis subflavus) Proposed
Endangered
No effect
Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC
DKey Version Publish Date: 01/14/2026 2 of 12
▪
▪
▪
▪
▪
Federal agencies must consult with U.S. Fish and Wildlife Service under section 7(a)(2) of the
Endangered Species Act (ESA) when an action may affect a listed species. Tricolored bat is
proposed for listing as endangered under the ESA, but not yet listed. For actions that may affect a
proposed species, agencies cannot consult, but they can confer under the authority of section 7(a)
(4) of the ESA. Such conferences can follow the procedures for a consultation and be adopted as
such if and when the proposed species is listed. Should the tricolored bat be listed, agencies must
review projects that are not yet complete, or projects with ongoing effects within the tricolored
bat range that previously received a NE or NLAA determination from the key to confirm that the
determination is still accurate.
To make a no effect determination, the full scope of the proposed project implementation (action)
should not have any effects (either positive or negative), to a federally listed species or
designated critical habitat. Effects of the action are all consequences to listed species or critical
habitat that are caused by the proposed action, including the consequences of other activities that
are caused by the proposed action. A consequence is caused by the proposed action if it would
not occur but for the proposed action and it is reasonably certain to occur. Effects of the action
may occur later in time and may include consequences occurring outside the immediate area
involved in the action. (See § 402.17).
Under Section 7 of the ESA, if a federal action agency makes a no effect determination, no
consultation with the Service is required (ESA §7). If a proposed Federal action may affect a
listed species or designated critical habitat, formal consultation is required except when the
Service concurs, in writing, that a proposed action "is not likely to adversely affect" listed species
or designated critical habitat [50 CFR §402.02, 50 CFR§402.13].
Other Species and Critical Habitat that May be Present in the Action Area
The IPaC-assisted determination key for the northern long-eared bat and tricolored bat does not
apply to the following ESA-protected species and/or critical habitat that also may occur in your
Action area:
American Chaffseed Schwalbea americana Endangered
Canby's Dropwort Oxypolis canbyi Endangered
Monarch Butterfly Danaus plexippus Proposed Threatened
Red-cockaded Woodpecker Dryobates borealis Threatened
Southern Hognose Snake Heterodon simus Proposed Threatened
You may coordinate with our Office to determine whether the Action may affect the animal
species listed above and, if so, how they may be affected.
Next Steps
If there are no updates on listed species, no further consultation/coordination for this project is
required with respect to the species covered by this key. However, the Service recommends that
project proponents re-evaluate the Project in IPaC if: 1) the scope, timing, duration, or location
Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC
DKey Version Publish Date: 01/14/2026 3 of 12
of the Project changes (includes any project changes or amendments); 2) new information reveals
the Project may impact (positively or negatively) federally listed species or designated critical
habitat; or 3) a new species is listed, or critical habitat designated. If any of the above conditions
occurs, additional coordination with the Service should take place to ensure compliance with the
Act.
If you have any questions regarding this letter or need further assistance, please contact the South
Carolina Ecological Services and reference Project Code 2025-0157205 associated with this
Project.
Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC
DKey Version Publish Date: 01/14/2026 4 of 12
Action Description
You provided to IPaC the following name and description for the subject Action.
1. Name
Borden
2. Description
The following description was provided for the project 'Borden':
Our client proposes to construct a 279-foot Self-Support Communications Tower,
with an overall height of 283 feet and associated equipment within a 50-foot by
50-foot fenced area within a 75-foot by 75-foot (5,625-square-foot) lease area.
The project includes a 12-foot-wide gravel drive within an access/utility
easement, measuring 30 feet wide, extending approximately 20 feet generally
northeast away from the lease area towards Camden Highway. The proposed
access/utility easement and tower compound lease area are located with an
agricultural field.
The approximate location of the project can be viewed in Google Maps:
https://
www.google.com/maps/@34.0673977,-80.50967833432742,14z
Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC
DKey Version Publish Date: 01/14/2026 5 of 12
1.
2.
3.
4.
5.
DETERMINATION KEY RESULT
Based on the information you provided, you have determined that the Proposed Action will have
no effect on the species covered by this determination key. Therefore, no consultation with the
U.S. Fish and Wildlife Service pursuant to Section 7(a)(2) of the Endangered Species Act of
1973 (87 Stat. 884, as amended 16 U.S.C. 1531 et seq.) is required for those species.
QUALIFICATION INTERVIEW
Does the proposed project include, or is it reasonably certain to cause, intentional take of
listed bats or any other listed species?
Note: Intentional take is defined as take that is the intended result of a project. Intentional take could refer to
research, direct species management, surveys, and/or studies that include intentional handling/encountering,
harassment, collection, or capturing of any individual of a federally listed threatened, endangered or proposed
species?
No
Is the action area wholly within Zone 2 of the year-round active area for northern long-
eared bat and/or tricolored bat?
Automatically answered
No
Does the action area intersect Zone 1 of the year-round active area for northern long-eared
bat and/or tricolored bat?
Automatically answered
Yes
Your project overlaps with an area where northern long-eared bats or tricolored bats may
be present and roosting in trees year-round.
Do you understand that your project may impact bats roosting in trees at any time during
the year?
Yes
Does any component of the action involve leasing, construction or operation of wind
turbines? Answer 'yes' if the activities considered are conducted with the intention of
gathering survey information to inform the leasing, construction, or operation of wind
turbines.
No
Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC
DKey Version Publish Date: 01/14/2026 6 of 12
6.
7.
8.
9.
10.
11.
12.
Is the proposed action authorized, permitted, licensed, funded, or being carried out by a
Federal agency in whole or in part?
Note for projects in Pennsylvania: Projects requiring authorization under Section 404 of the Clean Water Act
and/or Section 10 of the Rivers and Harbors Act would be considered as having a federal nexus. Since the U.S.
Army Corps of Engineers (Corps) has issued the Pennsylvania State Programmatic General Permit (PASPGP),
which may be verified by the PA Department of Environmental Protection or certain Conservation Districts, the
need to receive a Corps authorization to perform the work under the PASPGP serves as a federal nexus. As such,
if proposing to use the PASPGP, you would answer ‘yes’ to this question.
Yes
Is the Federal Highway Administration (FHWA), Federal Railroad Administration (FRA),
or Federal Transit Administration (FTA) funding or authorizing the proposed action, in
whole or in part?
No
Are you an employee of the federal action agency or have you been officially designated in
writing by the agency as its designated non-federal representative for the purposes of
Endangered Species Act Section 7 informal consultation per 50 CFR § 402.08?
Note: This key may be used for federal actions and for non-federal actions to facilitate section 7 consultation and
to help determine whether an incidental take permit may be needed, respectively. This question is for information
purposes only.
Yes
Is the lead federal action agency the Environmental Protection Agency (EPA) or Federal
Communications Commission (FCC)? Is the Environmental Protection Agency (EPA) or
Federal Communications Commission (FCC) funding or authorizing the proposed action,
in whole or in part?
Yes
[Semantic] Is the action area located within 0.5 miles of a known bat hibernaculum or
winter roost? Note: The map queried for this question contains proprietary information and
cannot be displayed. If you need additional information, please contact your state wildlife
agency.
Automatically answered
No
Does the action area contain any winter roosts or caves (or associated sinkholes, fissures,
or other karst features), mines, rocky outcroppings, or tunnels that could provide habitat
for hibernating bats?
No
Does the action area contain (1) talus or (2) anthropogenic or naturally formed rock
shelters or crevices in rocky outcrops, rock faces or cliffs?
No
Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC
DKey Version Publish Date: 01/14/2026 7 of 12
13.
14.
15.
16.
17.
18.
19.
Will the action cause effects to a bridge?
Note: Covered bridges should be considered as bridges in this question.
No
Will the action result in effects to a culvert or tunnel at any time of year?
No
Are trees present within 1000 feet of the action area?
Note: If there are trees within the action area that are of a sufficient size to be potential roosts for bats answer
"Yes". If unsure, additional information defining suitable summer habitat for the northern long-eared bat and
tricolored bat can be found in Appendix A of the USFWS’ Range-wide Indiana Bat and Northern long-eared bat
Survey Guidelines at:
https://www.fws.gov/media/range-wide-indiana-bat-and-northern-long-eared-bat-survey-
guidelines.
Yes
Does the action include the intentional exclusion of bats from a building or building-like
structure? Note: Exclusion is conducted to deny bats’ entry or reentry into a building. To be effective and to
avoid harming bats, it should be done according to established standards. If your action includes bat exclusion
and you are unsure whether northern long-eared bats or tricolored bats are present, answer “Yes.” Answer “No” if
there are no signs of bat use in the building/structure. If unsure, contact your local Ecological Services Field
Office to help assess whether northern long-eared bats or tricolored bats may be present. Contact a Nuisance
Wildlife Control Operator (NWCO) for help in how to exclude bats from a structure safely without causing harm
to the bats (to find a NWCO certified in bat standards, search the Internet using the search term “National
Wildlife Control Operators Association bats”). Also see the White-Nose Syndrome Response Team's guide for bat
control in structures.
No
Does the action involve removal, modification, or maintenance of a human-made building-
like structure (barn, house, or other building) known or suspected to contain roosting
bats?
No
Will the action cause construction of one or more new roads open to the public?
For federal actions, answer ‘yes’ when the construction or operation of these facilities is
either (1) part of the federal action or (2) would not occur but for an action taken by a
federal agency (federal permit, funding, etc.).
No
Will the action include or cause any construction or other activity that is reasonably certain
to increase average night-time traffic permanently or temporarily on one or more existing
roads? Note: For federal actions, answer ‘yes’ when the construction or operation of these facilities is either (1)
part of the federal action or (2) would not occur but for an action taken by a federal agency (federal permit,
funding, etc.). .
No
Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC
DKey Version Publish Date: 01/14/2026 8 of 12
20.
21.
22.
23.
24.
25.
26.
Will the action include or cause any construction or other activity that is reasonably certain
to increase the number of travel lanes on an existing thoroughfare?
For federal actions, answer ‘yes’ when the construction or operation of these facilities is
either (1) part of the federal action or (2) would not occur but for an action taken by a
federal agency (federal permit, funding, etc.).
No
Will the proposed Action involve the creation of a new water-borne contaminant source
(e.g., leachate pond, pits containing chemicals that are not NSF/ANSI 60 compliant)?
Note: For information regarding NSF/ANSI 60 please visit
https://www.nsf.org/knowledge-library/nsf-ansi-
standard-60-drinking-water-treatment-chemicals-health-effects
No
Will the proposed action involve the creation of a new point source discharge from a
facility other than a water treatment plant or storm water system?
No
Will the action include drilling or blasting?
No
Will the action involve military training (e.g., smoke operations, obscurant operations,
exploding munitions, artillery fire, range use, helicopter or fixed wing aircraft use at
night)?
No
Will the proposed action involve the use of herbicides or pesticides (e.g., fungicides,
insecticides, or rodenticides)?
No
Will the action include or cause activities that are reasonably certain to cause chronic or
intense nighttime noise (above current levels of ambient noise in the area) in suitable
summer habitat for the northern long-eared bat or tricolored bat during the active season?
Chronic noise is noise that is continuous or occurs repeatedly again and again for a long
time. Sources of chronic or intense noise that could cause adverse effects to bats may
include, but are not limited to: road traffic; trains; aircraft; industrial activities; gas
compressor stations; loud music; crowds; oil and gas extraction; construction; and mining.
Note: Additional information defining suitable summer habitat for the northern long-eared bat and tricolored bat
can be found in Appendix A of the USFWS’ Range-wide Indiana Bat and Northern long-eared bat Survey
Guidelines at:
https://www.fws.gov/media/range-wide-indiana-bat-and-northern-long-eared-bat-survey-
guidelines.
No
Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC
DKey Version Publish Date: 01/14/2026 9 of 12
27.
28.
29.
30.
31.
32.
33.
Does the action include, or is it reasonably certain to cause, the use of permanent or
temporary artificial lighting within 1000 feet of suitable northern long-eared bat or
tricolored bat roosting habitat?
Note: Additional information defining suitable summer habitat for the northern long-eared bat and tricolored bat
can be found in Appendix A of the USFWS’ Range-wide Indiana Bat and Northern long-eared bat Survey
Guidelines at:
https://www.fws.gov/media/range-wide-indiana-bat-and-northern-long-eared-bat-survey-
guidelines.
No
Will the action include tree cutting or other means of knocking down or bringing down
trees, tree topping, or tree trimming?
No
Will the proposed action result in the use of prescribed fire?
Note: If the prescribed fire action includes other activities than application of fire (e.g., tree cutting, fire line
preparation) please consider impacts from those activities within the previous representative questions in the key.
This set of questions only considers impacts from flame and smoke.
No
Does the action area intersect the tricolored bat species list area?
Automatically answered
Yes
Is the action area located within 0.5-mile of radius of an entrance/opening to any known
tricolored bat hibernacula or winter roost?
Note: The map queried for this question contains proprietary information and cannot be
displayed. If you need additional information, please contact your state wildlife agency.
Automatically answered
No
[Semantic] Is the action area located within 0.25 miles of a culvert that is known to be
occupied by northern long-eared or tricolored bats? Note: The map queried for this question
contains proprietary information and cannot be displayed. If you need additional information, please contact your
State wildlife agency.
Automatically answered
No
Your project overlaps with an area where tricolored bats may be present and roosting in
trees year-round.
Has a presence/probable absence survey for the tricolored bat following the Service’s
Range-wide Indiana Bat and Northern Long-Eared Bat Survey Guidelines been conducted
within the project area? If unsure, answer “No.”
No
Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC
DKey Version Publish Date: 01/14/2026 10 of 12
34.
35.
Your project overlaps with an area where tricolored bats may be present and roosting in
trees year-round.
Is suitable tricolored bat habitat present within 1000 feet of project activities? Note: If
there are trees within the action area that may provide potential roosts for tricolored bats
(e.g., clusters of leaves in live and dead deciduous trees, Spanish moss (Tillandsia
usneoides), clusters of dead pine needles of large live pines) answer "Yes." Additional
information defining suitable summer habitat for the northern long-eared bat and tricolored
bat can be found in Appendix A of the USFWS’ Range-wide Indiana Bat and Northern
long-eared bat Survey Guidelines at:
https://www.fws.gov/media/range-wide-indiana-bat-
and-northern-long-eared-bat-survey-guidelines.
Yes
Do you have any documents that you want to include with this submission?
No
Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC
DKey Version Publish Date: 01/14/2026 11 of 12
PROJECT QUESTIONNAIRE
Project code: 2025-0157205 IPaC Record Locator: 951-175636542 01/22/2026 13:42:24 UTC
DKey Version Publish Date: 01/14/2026 12 of 12
IPAC USER CONTACT INFORMATION
Agency: Trileaf Corporation
Name: Hannah Dell
Address: 1775 The Exchange SE
Address Line 2: Suite 525
City: Marietta
State: GA
Zip: 30339
Email h.dell@trileaf.com
Phone: 7063621745
LEAD AGENCY CONTACT INFORMATION
Lead Agency: Federal Communications Commission
County Scientific Name Common Name G Rank S Rank Federal Status State Status Group Type
Sumter Acipenser brevirostrum Shortnose Sturgeon G3 S3 LE: Federally
Endangered
SE: State Endangered Zoological
Sumter Clemmys guttata Spotted Turtle G5 S2 ARS: At-Risk Species ST: State Threatened Zoological
Sumter Corynorhinus rafinesquii Rafinesque's Big-eared Bat G3G4 S2 Not Applicable SE: State Endangered Zoological
Sumter Dryobates bor ealis Red-cockaded Woodpecker G3 S2 LT: Federally Threatend SE: State Endangered Zoological
Sumter Elanoides forficatus Swallow-tailed Kite G5 S2 MBTA: Migratory Bird
T
reaty Act
SE: State Endangered Zoological
Sumter Elassoma boehlkei Carolina Pygmy Sunfish G2 S1 Not Applicable ST: State Threatened Zoological
Sumter Eurycea chamberlaini Chamberlain's Dwarf Salamander G4 S3 ARS: At-Risk Species Not Applicable Zoological
Sumter Haliaeetus leucocephalus Bald Eagle G5 S3B,S3N Bald & Golden Eagle
Protection Act
ST: State Threatened Zoological
Sumter Heter odon simus Southern Hog-nosed Snake G2 S1 Not Applicable ST: State Threatened Zoological
Sumter Lasiurus cinereus Hoary Bat G3G4 S2 ARS: At-Risk Species Not Applicable Zoological
Sumter Lithobates capito Carolina Gopher Frog G2G3 S1 ARS: At-Risk Species SE: State Endangered Zoological
Sumter Lobelia boykinii Boykin’ s Lobelia G1G2 S2? ARS: At-Risk Species Not Applicable Botanical
Sumter Myotis lucifugus Little Brown Bat G3G4
S2 ARS: At-Risk Spe cies Not Applicable Zoological
Sumter Noturus sp. 2 Broadtail Madtom G2 S1 Not Applicable ST: State Threatened Zoological
Sumter Perimyotis subflavus T ricolored Bat G3G4 S3 LEP: Federally
Endangered (Proposed)
Not Applicable Zoological
Sumter Schwalbea americana Chaf fseed G2 S2 LE: Federally
Endangered
Not
Applicable Botanical
Sumter Sternula antillarum Least Tern G4 S2B MBTA: Migratory Bird
Treaty Act
ST: State Threatened Zoological
Sumter T iedemannia canbyi Canby's Cowbane G2 S2 LE: Federally
Endangered
Not
Applicable Botanical
HANNAH DELL
ASSISTANT PROJECT MANAGER
Education
Biology, B. S.
University of North Georgia / Gainesville, GA
Areas of Expertise
Ms. Dell has experience performing site inspections and conducting environmental due diligence pursuant
to EPA All Appropriate Inquiries (AAI) and the American Society of Testing and Materials (ASTM) for
commercial real estate and lending projects. Additionally, Ms. Dell has experience performing National
Environmental Policy Act (NEPA) reviews for wireless telecommunications projects.
Environmental service expertise includes:
Phase I Environmental Site Assessments
Historical City Directories
Information Section 7 Consultation
National Wetland Inventory Maps
Flood Insurance Rate Maps
Critical Habitat Maps
Environmental Evaluation Summaries
Archaeological and Architectural Impacts
Soil Characterization
Field Reconnaissance
Section 106 Compliance
NEPA Environmental Assessments
Migratory Bird Evaluations
Form 620/621 Submittals
Historical Topographic Maps and Aerial Imagery
Local Government Consultation
Native American Consultation
Land Use History
Certifications/Affiliations
ANSI/FCC RF Radiation Safety Competent Person
Basic Wetland Delineation (2023)
Professional Resume
Requested on Friday, October 17, 2025 by Hannah Dell.
PO Box 167
Columbia, SC 29202
(803) 734-1396
speciesreview@dnr.sc.gov
Re: Request for Threatened and Endangered Species Consultation
Hannah Dell - Borden - Communication/Cell Tower - Sumter County, South Carolina
The South Carolina Department of Natural Resources (SCDNR) has received your request for threatened and endangered
species consultation of the above named project in Sumter County, South Carolina. The following map depicts the project
area and a 1 mile buffer surrounding:
S
W E
N
RaftingCreek
521
Din
kin
s M
ill Rd
Scotts Branch Rd
Easy
St
T
B W
right Rd
De
nnis Rd
Dais Rd
Ellerbees Mill
253 ft
521
Da
is Rd
Spe
nce
rRd
Spence
rRd
M
cDaniel
Rd
Ma
yra
nt R
d
Dinkins Mill Rd
Hin es Rd
Hin
es Rd
Sources: Esri, USGS, CNES/Airbus DS, InterMap, Kartverket, LINZ, NASA/
METI, NASA/NGS, NLS Finland, NLSI, Ordnance Survey, SKGeodesy, Esri,
NASA, NGA, USGS, FEMA
0 0.25 0.50.13 Miles
This report includes the following items:
A - A report for species which intersect the project area
B - A report for species which intersect the buffer around the project area
C - A list of best management practices relevant to species near to or within the project area
D - A list of best management practices relevant to the project type
E - A list of state & federally listed species within the county of the project area
F - Other important information on conservation status, listed species, and how to submit observations to the program.
Please be advised:
The contents of this report, including all tables, maps, recommendations, and various other text, are produced as a direct
result of the information a user provides at the time of submission. The SCDNR assumes that all information submitted by
the user represents the project scope as proposed, and recommends that additional reports be requested should the scope
deviate from how the project was initially represented to the SCDNR.
The technical comments outlined in this report are submitted to speak to the general impacts of the activities as described
through inquiry by parties outside the South Carolina Department of Natural Resources. These technical comments are
submitted as guidance to be considered and are not submitted as final agency comments that might be related to any
unspecified local, state or federal permit, certification or license applications that may be needed by any applicant or their
contractors, consultants or agents presently under review or not yet made available for public review. In accordance with
its policy 600.01, Comments on Projects Under Department Review, the South Carolina Department of Natural
Resources, reserves the right to comment on any permit, certification or license application that may be published by any
regulatory agency which may incorporate, directly or by reference, these technical comments.
Interested parties are to understand that SCDNR may provide a final agency position to regulatory agencies if any local,
state or federal permit, certification or license applications may be needed by any applicant or their contractors,
consultants or agents. For further information regarding comments and input from SCDNR on your project, please contact
our Office of Environmental Programs by emailing environmental@dnr.sc.gov or by visiting
www.dnr.sc.gov/environmental. Pursuant to Section 7 of the Endangered Species Act, requests for formal letters of
concurrence with regards to federally listed species should be directed to the USFWS.
Should you have any questions or need more information, please do not hesitate to contact our office by email at
speciesreview@dnr.sc.gov or by phone at 803-734-4080.
Sincerely,
Megan Levinson
Heritage Trust Program
SC Department of Natural Resources
Camden H
wy
521
There are 0 tracked species records found within the project foot print. The
following table outlines occurrences found within the project footprint (if any),
sorted by listing status and species name. Please keep in mind that this
information is derived from existing databases and do not assume that it is
complete. Areas not yet inventoried may contain significant species or
communities. You can find more information about global and state rank status
definitions by visiting Natureserve's web page. Please note that certain
sensitive species found on site may be listed in this table but are not
represented on the map. Please contact speciesreview@dnr.sc.gov should you
have further questions related to sensitive species found within the project area.
Map Credits: Sources: Esri, USGS, CNES/Airbus DS, InterMap, Kartverket, LINZ, NASA/METI, NASA/NGS, NLS
Finland, NLSI, Ordnance Survey, SKGeodesy, Sources: Esri, Maxar, Airbus DS, USGS, NGA, NASA, CGIAR, N
Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, Intermap, and the
A. Project Area - Species Report
No records for species of concern are found within the project area
521
Dinkins Mil
l Rd
Sco
tts Bra nch R
d
El
lerb
e
Mi
llRd
T B Wri
ght R
d Ellerbees Mill Dais
Rd
Ci
mmaro
n Rd
Spe
ncer Rd
B. Buffer Area - Species Report
The following table outlines rare, threatened or endangered species found
within 1 miles of the project footprint, arranged in order of protection status
and species name. Please keep in mind that this information is derived from
existing databases and do not assume that it is complete. Areas not yet
inventoried may contain significant species or communities. You can find more
information about global and state rank status definitions by visiting
Natureserve's web page. Please note that certain sensitive species found within
the buffer area may be listed in this table but are not represented on the map.
Map Credits: Sources: Esri, USGS, CNES/Airbus DS, InterMap, Kartverket, LINZ, NASA/METI, NASA/NGS, NLS
Finland, NLSI, Ordnance Survey, SKGeodesy, Esri, NASA, NGA, USGS, FEMA
No records for species of concern are found within the buffered
search distance area
Camden H
wy
C. Species Best Management Practices (1 of 1)
SCDNR offers the following comments and best
management practices (BMPs) regarding this project's
potential impacts to species of concern which may be
found on or near to the project area. Please contact
speciesreview@dnr.sc.gov should you have further
questions with regard to survey methods, consultation, or
other species-related concerns.
Map Credits: Sources: Esri, USGS, CNES/Airbus DS, InterMap, Kartverket, LINZ, NASA/METI, NASA/NGS, NLS
Finland, NLSI, Ordnance Survey, SKGeodesy, Sources: Esri, Maxar, Airbus DS, USGS, NGA, NASA, CGIAR, N
Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, Intermap, and the GIS
BMP Output
Three listed species of bats have been known to occur in the coastal plain ecoregions of South Carolina, including the state-
endangered Rafinesque’s big-eared bat (Corynorhinus rafinesquii); the federally endangered northern long-eared bat (NLEB) (Myotis
septentrionalis); and the federally at-risk & proposed endangered tricolored bat (Perimyotis subflavus). Please note that take of a
state endangered species is prohibited under S.C. Code of Laws §50-15-30. Prior to any land-clearing activities in the proposed
project area, the SCDNR recommends a threatened and endangered species assessment be conducted to identify suitable habitat and
provided to SCDNR for review.
Regarding Rafinesque's big-eared bat (1 of 2): Suitable habitat for Rafinesque’s big-eared bat is defined as swamp forests, hardwood
or mixed mature bottomlands, maritime forests and black gum (Nyssa sylvatica) and water tupelo (Nyssa aquatic) stands (Cochran
1999, Hofmann et al. 1999, Lance et al. 2001, Gooding and Langford 2004, Trousdale and Beckett 2005).If suitable habitat exists
within the project, the SCDNR recommends assumption of presence of Rafinesque’s big-eared bat within areas of forested wetlands
and to further protect these areas, surround them with a 1000-foot buffers and avoid tree clearing from May 1st to July 31st to
minimize disturbance and destruction of habitat that may be used by females during gestation or maternal care for pups. All other
tree clearing outside of the forested wetlands and its associated buffer may occur in areas that are not wetlands or other aquatic
resources in non-Rafinesque’s big-eared bat maternity roosting habitat anytime. Where wetlands occur that are not Rafinesque’s big-
eared bat habitat, but they are spotted turtle habitat, tree clearing should only occur August to December to prevent impacts to spotted
turtles during reproduction. However, if wetlands are dry January to June, they may be cleared, but they must be completely dry (no
surface water present).For future right-of-way management (if applicable), use heavy equipment and herbicide treatment for right-of-
way vegetation management in wetlands only during the months of July to November. If wetlands are completely dry (no surface
water present), heavy equipment may be used January to June, but the wetlands must be completely dry.
Please note that tricolored bat was proposed for listing by the U.S. Fish and Wildlife Service on September 13, 2022. Therefore, due
to the conservation concerns surrounding this species, the SCDNR strongly suggests acoustic surveys be conducted by a qualified
individual during the summer months to assess the use of the area to be cleared by tricolored bats. Should the species occur in the
proposed area slated for clearing, coordination should occur with SCDNR and USFWS regarding avoidance and minimization
measures. Tricolored bat utilize caves, rock crevices, tree foliage and basal cavities, Spanish moss and man-made structures, such as
houses, barns and culverts, as maternity roosts during the summer months and they will use more than one roost location. If this
species are found on-site, please contact the U.S. Fish & Wildlife Service and SCDNR. The SCDNR recommends the assumption of
presence of the the species and abide by a clearing moratorium from May 1st to July 31st if suitable habitat for the species is likely or
are explicitly identified within the project footprint.
D. Project Best Management Practices (1 of 2)
Camden H
wy
SCDNR offers the following comments and best management
practices (BMPs) regarding this project's potential impacts to
natural resources within or surrounding the project area. Please
contact our Office of Environmental Programs at
environmental@dnr.sc.gov should you have further questions
with regard to best management practices related to this project
area.
Map Credits: Sources: Esri, USGS, CNES/Airbus DS, InterMap, Kartverket, LINZ, NASA/METI, NASA/NGS, NLS
Finland, NLSI, Ordnance Survey, SKGeodesy, Sources: Esri, Maxar, Airbus DS, USGS, NGA, NASA, CGIAR, N
Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, Intermap, and the GIS
BMP Output
• All necessary measures must be taken to prevent oil, tar, trash and other pollutants from entering the adjacent offsite areas/wetlands/
water.• Once the project is initiated, it must be carried to completion in an expeditious manner to minimize the period of disturbance
to the environment.
• Upon project completion, all disturbed areas must be permanently stabilized with vegetative cover (preferable), riprap or other
erosion control methods as appropriate.
• The project must be in compliance with any applicable floodplain, stormwater, land disturbance, shoreline management guidance or
riparian buffer ordinances.
• Prior to beginning any land disturbing activity, appropriate erosion and siltation control measures (e.g. silt fences or barriers) must
be in place and maintained in a functioning capacity until the area is permanently stabilized.
• Materials used for erosion control (e.g., hay bales or straw mulch) will be certified as weed free by the supplier.
• Inspecting and ensuring the maintenance of temporary erosion control measures at least:
a. on a daily basis in areas of active construction or equipment operation;
b. on a weekly basis in areas with no construction or equipment operation; and
c. within 24 hours of each 0.5 inch of rainfall.
• Ensuring the repair of all ineffective temporary erosion control measures within 24 hours of identification, or as soon as conditions
allow if compliance with this time frame would result in greater environmental impacts.
• Land disturbing activities must avoid encroachment into any wetland areas (outside the permitted impact area).Wetlands that are
unavoidably impacted must be appropriately mitigated.
• Your project may require a Stormwater Permit from the SC Department of Health & Environmental Control, please visit
<LINK>https://www.scdhec.gov/environment/water-quality/stormwater</LINK>
D. Project Best Management Practices (2 of 2)
Camden H
wy
SCDNR offers the following comments and best management
practices (BMPs) regarding this project's potential impacts to
natural resources within or surrounding the project area. Please
contact our Office of Environmental Programs at
environmental@dnr.sc.gov should you have further questions
with regard to best management practices related to this project
area.
Map Credits: Sources: Esri, USGS, CNES/Airbus DS, InterMap, Kartverket, LINZ, NASA/METI, NASA/NGS, NLS
Finland, NLSI, Ordnance Survey, SKGeodesy, Sources: Esri, Maxar, Airbus DS, USGS, NGA, NASA, CGIAR, N
Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, Intermap, and the GIS
BMP Output
• Maintenance clearing or mowing of rights-of-way should not occur between April 15 and August 1 of a given year to avoid nesting
season for a majority of migratory birds. The mower deck should be set no lower than 6 inches high so native herbaceous
vegetation will not be damaged.• The SCDNR recommends you follow the current guidelines outlined in the US Fish and Wildlife
Service’s Recommended Best Practices for Communication Tower Design, Siting, Construction, Operation, Maintenance, and
Decommissioning (https://www.fws.gov/media/recommended-best-practices-communication-tower-design-siting-construction-
operation)• Pertinent suggestions discussed in the guidelines that effect birds include using flashing lights only, not situating the
tower near wetlands, reducing or eliminating tension wires which are impact hazards, and that vegetation removal be done outside
of the nesting season to avoid mortality to eggs and chicks. Migrating bats such as hoary bats sometimes do hit wires and tall
structures so reducing guy wires or using a lattice instead per these guidelines might help. Additional tower guidelines for federally
protected Northern long-eared bat conservation can be found in the Federal Communications Commission’s Tower Construction
Guidance for Protection of Northern Long-Eared Bat Under the Endangered Species Act (https://www.fcc.gov/document/tower-
guidance-northern-long-eared-bat.)
County Scientific Name Common Name G Rank S Rank Federal Status State Status Group Type
Sumter Acipenser brevirostrum Shortnose Sturgeon G3 S3 LE: Federally
Endangered
SE: State Endangered Zoological
Sumter Clemmys guttata Spotted Turtle G5 S2 ARS: At-Risk Species ST: State Threatened Zoological
Sumter Corynorhinus rafinesquii Rafinesque's Big-eared Bat G3G4 S2 Not Applicable SE: State Endangered Zoological
Sumter Dryobates borealis Red-cockaded Woodpecker G3 S2 LT: Federally Threatend SE: State Endangered Zoological
Sumter Elanoides forficatus Swallow-tailed Kite G5 S2 MBTA: Migratory Bird
Treaty Act
SE: State Endangered Zoological
Sumter Elassoma boehlkei Carolina Pygmy Sunfish G2 S1 Not Applicable ST: State Threatened Zoological
Sumter Eurycea chamberlaini Chamberlain's Dwarf Salamander G4 S3 ARS: At-Risk Species Not Applicable Zoological
Sumter Haliaeetus leucocephalus Bald Eagle G5 S3B,S3N Bald & Golden Eagle
Protection Act
ST: State Threatened Zoological
Sumter Heterodon simus Southern Hog-nosed Snake G2 S1 Not Applicable ST: State Threatened Zoological
Sumter Lasiurus cinereus Hoary Bat G3G4 S2 ARS: At-Risk Species Not Applicable Zoological
Sumter Lithobates capito Carolina Gopher Frog G2G3 S1 ARS: At-Risk Species SE: State Endangered Zoological
Sumter Lobelia boykinii Boykin’s Lobelia G1G2 S2? ARS: At-Risk Species Not Applicable Botanical
Sumter Myotis lucifugus Little Brown Bat G3G4 S2 ARS: At-Risk Species Not Applicable Zoological
Sumter Noturus sp. 2 Broadtail Madtom G2 S1 Not Applicable ST: State Threatened Zoological
Sumter Perimyotis subflavus Tricolored Bat G3G4 S3 LEP: Federally
Endangered (Proposed)
Not Applicable Zoological
Sumter Schwalbea americana Chaffseed G2 S2 LE: Federally
Endangered
Not Applicable Botanical
Sumter Sternula antillarum Least Tern G4 S2B MBTA: Migratory Bird
Treaty Act
ST: State Threatened Zoological
Sumter Tiedemannia canbyi Canby's Cowbane G2 S2 LE: Federally
Endangered
Not Applicable Botanical
The South Carolina Department of Natural Resources’ Heritage Trust Program organizes a database
that captures and tracks element of occurrence data for rare, threatened and endangered species, both
federal and state. Please keep in mind that this information included within this report is derived from
existing databases, and do not assume that it is complete. Areas not yet inventoried may contain
significant species or communities. If your project requires the assessment of potential threatened or
endangered species that could be within the project area, the SCDNR asks that you include a review of
the state listed species within the county or watershed in addition to those that may be within the
report as being within the project footprint or within 1-mile of the proposed project area.
Consideration should be given to the occurrence of suitable habitat onsite, species movement and
connectivity of habitat when assessing the likelihood of a state listed species on the project area.
E. State & Federally Listed Species in
Sumter County
Camden H
wy
521
Map Credits: Sources: Esri, USGS, CNES/Airbus DS, InterMap, Kartverket, LINZ, NASA/METI, NASA/NGS, NLS
Finland, NLSI, Ordnance Survey, SKGeodesy, Sources: Esri, Maxar, Airbus DS, USGS, NGA, NASA, CGIAR, N
Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, Intermap, and the GIS
1) Follow https://arcg.is/1a0jzC0 or use the QR code here.
2) Select ‘Open in browser’ or 'Open in the Survey123 field app' depending on
your preference. The browser option will only work when connected to the
internet.
3) If using in the Survey123 field app, be sure to download the app from your
app store beforehand.
The SC Natural Heritage Dataset relies on continuous
monitoring and surveying for species of concern throughout the
state. Any records of species of concern found within this project
area would greatly benefit the quality and comprehensiveness of
the statewide dataset for rare, threatened and endangered species.
Below are instructions for how to download the SC Natural
Heritage Occurrence Reporting Form through the Survey123
App.
F. Important Information & Instructions
for Submitting Species Observations
Camden H
wy
Map Credits: Sources: Esri, USGS, CNES/Airbus DS, InterMap, Kartverket, LINZ, NASA/METI, NASA/NGS, NLS
Finland, NLSI, Ordnance Survey, SKGeodesy, Sources: Esri, Maxar, Airbus DS, USGS, NGA, NASA, CGIAR, N
Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, Intermap, and the GIS
Instructions for accessing the SC Natural Heritage Occurrence Reporting Form
Conservation Ranks & SWAP Priority Status
The SC Natural Heritage Program assigns S Ranks for species tracked within the state of South Carolina based on ranking
methodology developed by NatureServe and its state program network. For information conservation rank definitions,
please visit https://explorer.natureserve.org/AboutTheData/Statuses
The SCDNR maintains and updates it's State Wildlife Action Plan (SWAP) every 10 years. This plan categorizes species
of concern by Moderate, High, and Highest Priority. Please visit https://www.dnr.sc.gov/swap/index.html for more
information about the SC SWAP.
The South Carolina Department of Natural Resources’ Heritage Trust Program organizes a database that captures and
tracks element of occurrence data for rare, threatened and endangered species, both federal and state. Please keep in mind
that this information included within this report is derived from existing databases, and do not assume that it is complete.
Areas not yet inventoried may contain significant species or communities. If your project requires the assessment of
potential threatened or endangered species that could be within the project area, the SCDNR asks that you include a
review of the state listed species within the county or watershed in addition to those that may be within the report as being
within the project footprint or within 1-mile of the proposed project area. Consideration should be given to the occurrence
of suitable habitat onsite, species movement and connectivity of habitat when assessing the likelihood of a state listed
species on the project area. To view these lists please visit our county and watershed dashboards at our website:
https://natural-heritage-program-scdnr.hub.arcgis.com/#track
Important Information Regarding Element Occurrence Data:
State-listed Species Guidance
The South Carolina Department of Natural Resources has released a document to provide clarity for the avoidance of a
take of a state listed species and what may be needed from permit applicants, for each species listed as threatened or
endangered under SC Code of Regulations 123-150 and 123-150.2. Please review this document for information on
species-habitat requirements, survey protocol, and other information regarding environmental review:
https://dnr.sc.gov/environmental/docs/SCDNRStateListedSpeciesProtectionGuidance.pdf
Appendix E
Section 106 Review
1775 The Exchange SE, Suite 525, Atlanta, GA 30339 - 678-653-8673 - www.trileaf.com
November 26, 2025
South Carolina Department of Archives and History
8301 Pa
rklane Road
Columbia, SC 29223
Phone: 803-
896-6196
RE: Harmoni Towers LLC – Borden – Client #SC 0009812 – Trileaf Project #772867
Camde
n Highway, Rembert, South Carolina 29128
Sumter County, Rembert Quadrangle (USGS)
Latitude: 34° 4’ 2.5869” N, Longitude: 80° 30’ 34.8467” W
To Whom It May Concern,
Tril
eaf Corporation is in the process of completing a NEPA review at the referenced property. Our client proposes
to construct a 279- foot Self-Support Communications Tower, with an overall height of 283 feet and associated
equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-square-foot) lease area. The
project includes a 12-foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending
approximately 20 feet generally northeast away from the lease area towards Camden Highway. The proposed
access/utility easement and tower compound lease area are located with an agricultural field. The antenna will be
licensed by the Federal Communications Commission (FCC).
In acc
ordance with the Nationwide Programmatic Agreement for Review of Effects on Historic Properties for
Certain Undertakings Approved by the Federal Communications Commission, dated September 2004, a cultural
resource investigation has been conducted. Our investigation includes determining if the site is contained in, on,
or within the viewshed of a building, site, district, structure or object, significant in American history, architecture,
archeology, engineering or culture, that is listed, or eligible for listing on the State or National Registers of Historic
Places, or located in or on an Indian Religious Site.
Summa
ry reports of this investigation, maps, photographs and other information are provided in the attached Form
620. As noted in Attachment 5, there are No Historic Properties in the APE for Direct Effects and No Historic
Properties in the APE for Visual Effects. Therefore, it is recommended that the proposed undertaking proceed
without further archaeological review.
We app
reciate your cooperation in this regard and anticipate your concurrence with these findings. Please call me
at (706) 362-1745 or email h.dell@trileaf.com if you need any additional information or have any questions.
Thank you for your assistance.
Sinc
erely,
Hannah
Dell
Assistant Project Manager
FCC Form FCC Wireless Telecommunications Bureau Approved by OMB
3060 – 1039
Notification Date: See instructions for
File Number: public burden estimates
General Information
1) (Select only one) ( )
NE – New UA – Update of Application WD – Withdrawal of Application
2) If this application is for an Update or Withdrawal, enter the file number of the pending application
currently on file. File Number:
Applicant Information
3) FCC Registration Number (FRN):
4) Name:
Contact Name
5) First Name: 6) MI: 7) Last Name: 8) Suffix:
9) Title:
Contact Information
10) P.O. Box: And
/Or 11) Street Address:
12) City: 13) State: 14) Zip Code:
15) Telephone Number: 16) Fax Number:
17) E-mail Address:
Consultant Information
18) FCC Registration Number (FRN):
19) Name:
Principal Investigator
20) First Name: 21) MI: 22) Last Name: 23) Suffix:
24) Title:
Principal Investigator Contact Information
25) P.O. Box: And
/Or 26) Street Address:
27) City: 28) State: 29) Zip Code:
30) Telephone Number: 31) Fax Number:
32) E-mail Address:
Harmoni Towers, LLC
0025999053
Jennifer Brown
10801 Executive Center Drive
Little Rock AR 72211
(501)799-6390
0011724176
Acheulean Consulting on behalf of Trileaf Corporation
Jennifer.Brown@harmonitowers.com
Jason Flay
1503 Cypress Street
Paris KY 40361
(678)653-8673
h.dell@trileaf.com
1 of 13
NE
620
FCC Form 620
New Tower (/0 NT/1) Submission Packet
0011798220
7AM EST 11/28/2025
May 2014
Professional Qualification
33) Does the Principal Investigator satisfy the Secretary of the Interior’s Professional Qualification Standards? ( ) Yes ( ) N o
34) Areas of Professional Qualification:
( ) Archaeologist
( ) Architectural Historian
( ) Historian
( ) Architect
( ) Other (Specify) __________________________________________________________________________________________
Additional Staff
35) Are there other staff involved who meet the Professional Qualification Standards of the Secretary of the Interior? ( ) Yes ( ) N o
If “YES,” complete the following:
X
X
X
36) First Name: 37) MI: 38) Last Name: 39) Suffix:
40) Title:
41) Areas of Professional Qualification:
( ) Archaeologist
( ) Architectural Historian
( ) Historian
( ) Architect
( ) Other (Specify) ____________________________________________________________________________________________
2 of 13 FCC Form 620
May 2014
Site Information
Tower Construction Notification System
1) TCNS Notification Number:
Site Information
2) Positive Train Control Filing Subject to Expedited Treatment Under Program Comment: ( ) Yes ( ) No
3) Site Name:
4) Site Address:
5) Detailed Description of Project:
6) City: 7) State: 8) Zip Code:
9) County/Borough/Parish:
10) Nearest Crossroads:
11) NAD 83 Latitude (DD-MM-SS.S): ( ) N or ( ) S
12) NAD 83 Longitude (DD-MM-SS.S): ( ) E or ( ) W
Tower Information
13) Tower height above ground level (include top-mounted attachments such as lightning rods): ___________________ ( ) Feet ( ) Meters
14) Tower Type (Select One):
( ) Guyed lattice tower
( ) Self-supporting lattice
( ) Monopole
( ) Other (Describe):
Project Status
15) Current Project Status (Select One):
( ) Construction has not yet commenced
( ) Construction has commenced, but is not completed Construction commenced on: _______________
( ) Construction has been completed Construction commenced on: _______________
Construction completed on: _______________
301523
Borden
Camden Highway
Rembert SC
SUMTER
29128
34-04-02.6
080-30-34.8
X
X
86.3 X
/32
3 of 13
X
X
FCC Form 620
Camden Highway and Dais Road
May 2014
Camden Highway and Dais Road
Harmoni Towers LLC proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of 283
feet and associated equipment within a 75-foot by 75-foot (5,625-square-foot) lease area.
X
Determination of Effect
14) Direct Effects (Select One):
( ) No Historic Properties in Area of Potential Effects (APE)
( ) No Effect on Historic Properties in APE
( ) No Adverse Effect on Historic Properties in APE
( ) Adverse Effect on one or more Historic Properties in APE
15) Visual Effects (Select One):
( ) No Historic Properties in Area of Potential Effects (APE)
( ) No Effect on Historic Properties in APE
( ) No Adverse Effect on Historic Properties in APE
( ) Adverse Effect on one or more Historic Properties in APE
4 of 13
X
X
FCC Form 620
May 2014
Tribal/NHO Involvement
1) Have Indian Tribes or Native Hawaiian Organizations (NHOs) been identified that may attach religious and cultural
significance to historic properties which may be affected by the undertaking within the APEs for direct and visual
effects?
( ) Yes ( ) No
2a) Tribes/NHOs contacted through TCNS Notification Number: ___________________ Number of Tribes/NHOs: _________________
2b) Tribes/NHOs contacted through an alternate system: Number of Tribes/NHOs: _________________
301523 6
X
0
Tribe/NHO Contacted Through TCNS
3) Tribe/NHO FRN:
4) Tribe/NHO Name:
Contact Name
5) First Name: 6) MI: 7) Last Name: 8) Suffix:
9) Title:
Dates & Response
10) Date Contacted ______________ 11) Date Replied _______________
( ) No Reply
( ) Replied/No Interest
( ) Replied/Have Interest
( ) Replied/Other
Catawba Indian Nation
09/18/2025
X
Dr. Wenonah Haire DMDG
THPO and Executive Director
Tribe/NHO Contacted Through TCNS
3) Tribe/NHO FRN:
4) Tribe/NHO Name:
Contact Name
5) First Name: 6) MI: 7) Last Name: 8) Suffix:
9) Title:
Dates & Response
10) Date Contacted ______________ 11) Date Replied _______________
( ) No Reply
( ) Replied/No Interest
( ) Replied/Have Interest
( ) Replied/Other
Cherokee Nation
09/17/2025
X
Gwen Terrapin
5 of 13 FCC Form 620
May 2014
Tribal/NHO Involvement
1) Have Indian Tribes or Native Hawaiian Organizations (NHOs) been identified that may attach religious and cultural
significance to historic properties which may be affected by the undertaking within the APEs for direct and visual
effects?
( ) Yes ( ) No
2a) Tribes/NHOs contacted through TCNS Notification Number: ___________________ Number of Tribes/NHOs: _________________
2b) Tribes/NHOs contacted through an alternate system: Number of Tribes/NHOs: _________________
301523 6
X
0
Tribe/NHO Contacted Through TCNS
3) Tribe/NHO FRN:
4) Tribe/NHO Name:
Contact Name
5) First Name: 6) MI: 7) Last Name: 8) Suffix:
9) Title:
Dates & Response
10) Date Contacted ______________ 11) Date Replied _______________
( ) No Reply
( ) Replied/No Interest
( ) Replied/Have Interest
( ) Replied/Other
Eastern Shawnee Tribe of Oklahoma
09/18/2025 09/18/2025
X
Lora Nuckolls
Director
Tribe/NHO Contacted Through TCNS
3) Tribe/NHO FRN:
4) Tribe/NHO Name:
Contact Name
5) First Name: 6) MI: 7) Last Name: 8) Suffix:
9) Title:
Dates & Response
10) Date Contacted ______________ 11) Date Replied _______________
( ) No Reply
( ) Replied/No Interest
( ) Replied/Have Interest
( ) Replied/Other
Prairie Island Indian Community
09/17/2025
X
Noah White IIIC
THPO
6 of 13 FCC Form 620
May 2014
Tribal/NHO Involvement
1) Have Indian Tribes or Native Hawaiian Organizations (NHOs) been identified that may attach religious and cultural
significance to historic properties which may be affected by the undertaking within the APEs for direct and visual
effects?
( ) Yes ( ) No
2a) Tribes/NHOs contacted through TCNS Notification Number: ___________________ Number of Tribes/NHOs: _________________
2b) Tribes/NHOs contacted through an alternate system: Number of Tribes/NHOs: _________________
301523 6
X
0
Tribe/NHO Contacted Through TCNS
3) Tribe/NHO FRN:
4) Tribe/NHO Name:
Contact Name
5) First Name: 6) MI: 7) Last Name: 8) Suffix:
9) Title:
Dates & Response
10) Date Contacted ______________ 11) Date Replied _______________
( ) No Reply
( ) Replied/No Interest
( ) Replied/Have Interest
( ) Replied/Other
Thlopthlocco Tribal Town
09/17/2025
X
Ryan Morrow
Mekko
Tribe/NHO Contacted Through TCNS
3) Tribe/NHO FRN:
4) Tribe/NHO Name:
Contact Name
5) First Name: 6) MI: 7) Last Name: 8) Suffix:
9) Title:
Dates & Response
10) Date Contacted ______________ 11) Date Replied _______________
( ) No Reply
( ) Replied/No Interest
( ) Replied/Have Interest
( ) Replied/Other
Tuscarora Nation
09/17/2025
X
Bryan Printup
TCNS Rep
7 of 13 FCC Form 620
May 2014
Other Tribes/NHOs Contacted
Tribe/NHO Information
1) FCC Registration Number (FRN):
2) Name:
Contact Name
3) First Name: 4) MI: 5) Last Name: 6) Suffix:
7) Title:
Contact Information
8) P.O. Box: And
/Or 9) Street Address:
10) City: 11) State: 12) Zip Code:
13) Telephone Number: 14) Fax Number:
15) E-mail Address:
16) Preferred means of communication:
( ) E-mail
( ) Letter
( ) Both
Dates & Response
17) Date Contacted _______________ 18) Date Replied _______________
( ) No Reply
( ) Replied/No Interest
( ) Replied/Have Interest
( ) Replied/Other
8 of 13 FCC Form 620
May 2014
Historic Properties
Properties Identified
1) Have any historic properties been identified within the APEs for direct and visual effect? ( ) Yes ( ) No
2) Has the identification process located archaeological materials that would be directly affected, or sites that are of
cultural or religious significance to Tribes/NHOs? ( ) Yes ( ) No
3) Are there more than 10 historic properties within the APEs for direct and visual effect?
If “Yes”, you are required to attach a Cultural Res ources Report in lieu of adding the Historic Property below. ( ) Yes ( ) No
Historic Property
4) Property Name:
5) SHPO Site Number:
Property Address
6) Street Address:
7) City: 8) State: 9) Zip Code:
10) County/Borough/Parish:
Status & Eligibility
11) Is this property listed on the National Register?
Source: _______________________________________________________________________________________
( ) Yes ( ) No
12) Is this property eligible for listing on the National Register?
Source: _______________________________________________________________________________________
( ) Yes ( ) No
13) Is this property a National Historic Landmark? ( ) Yes ( ) No
14) Direct Effects (Select One):
( ) No Effect on this Historic Property in APE
( ) No Adverse Effect on this Historic Property in APE
( ) Adverse Effect on this Historic Property in APE
15) Visual Effects (Select One):
( ) No Effect on this Historic Property in APE
( ) No Adverse Effect on this Historic Property in APE
( ) Adverse Effect on this Historic Property in APE
X
X
X
9 of 13 FCC Form 620
May 2014
Local Government Involvement
Local Government Agency
1) FCC Registration Number (FRN):
2) Name:
Contact Name
3) First Name: 4) MI: 5) Last Name: 6) Suffix:
7) Title:
Contact Information
8) P.O. Box: And
/Or 9) Street Address:
10) City: 11) State: 12) Zip Code:
13) Telephone Number: 14) Fax Number:
15) E-mail Address:
16) Preferred means of communication:
( ) E-mail
( ) Letter
( ) Both
Dates & Response
17) Date Contacted _______________ 18) Date Replied _______________
( ) No Reply
( ) Replied/No Interest
( ) Replied/Have Interest
( ) Replied/Other
Additional Information
19) Information on local government’s role or interest (optional):
Sumter County Planning Department
To Whom It May Concern
12 West Liberty Street
Sumter SC 29150
(803)774-1660
planningdepartment@sumtersc.gov
09/22/2025
X
X
10 of 13 FCC Form 620
May 2014
Other Consulting Parties
Other Consulting Parties Contacted
1) Has any other agency been contacted and invited to become a consulting party? ( ) Yes ( ) No
Consulting Party
2) FCC Registration Number (FRN):
3) Name:
Contact Name
4) First Name: 5) MI: 6) Last Name: 7) Suffix:
8) Title:
Contact Information
9) P.O. Box: And
/Or 10) Street Address:
11) City: 12) State: 13) Zip Code:
14) Telephone Number: 15) Fax Number:
16) E-mail Address:
17) Preferred means of communication:
( ) E-mail
( ) Letter
( ) Both
Dates & Response
18) Date Contacted _______________ 19) Date Replied _______________
( ) No Reply
( ) Replied/No Interest
( ) Replied/Have Interest
( ) Replied/Other
Additional Information
20) Information on other consulting parties’ role or interest (optional):
X
Sumter County Genealogical Society
To Whom It May Concern
122 N Washington St.
Sumter SC 29150
(803)774-3901
genealogy@ftc-i.net
X
09/22/2025
X
11 of 13 FCC Form 620
May 2014
Designation of SHPO/THPO
1) Designate the Lead State Historic Preservation Officer (SHPO) or Tribal Historic Preservation Officer (THPO) based on the location of the tower.
SHPO/THPO
Name: ___________________________________________________________________________________________________________
2) You may also designate up to three additional SHPOs/THPOs if the APEs include multiple states. If the APEs include other countries, enter the name of
the National Historic Preservation Agency and any state and provincial Historic Preservation Agency.
SHPO/THPO Name: ________________________________________________________________________________________________
SHPO/THPO Name: ________________________________________________________________________________________________
SHPO/THPO Name: ________________________________________________________________________________________________
Certification
I certify that all representations on this FCC Form 620 Submission Packet and the accompanying attachments are true, correct, and complete.
Party Authorized to Sign
First Name: MI: Last Name: Suffix:
Signature: Date:
_______________
FAILURE TO SIGN THIS APPLICATION MAY RESULT IN DISMISSAL OF THE APPLICATION AND FORFEITURE OF ANY FEES PAID.
WILLFUL FALSE STATEMENTS MADE ON THIS FORM OR ANY ATTACHMENTS ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S.
Code, Title 18, Section 1001) AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. Code, Title 47, Section
312(a)(1)), AND/OR FORFEITURE (U.S. Code, Title 47, Section 503).
12 of 13 FCC Form 620
Department of Archives and History
Hannah Dell
11/26/2025
Hannah Dell
May 2014
Attachments :
Type Description Date Entered
Other SHPO Cover Letter 11/26/2025
Resumes/Vitae Attach1 - Resumes 11/26/2025
Photographs Attach2 - Photos 11/26/2025
Map Documents Attach3 - Maps 11/26/2025
Additional Site Information Attach4 - Site Info 11/26/2025
Area of Potential Effects Attach5 - APE 11/26/2025
Tribal/NHO Involvement Attach6 - Tribes 11/26/2025
Historic Properties for Direct Effects Attach7 - Direct APE 11/26/2025
Historic Properties for Visual Effects Attach8 - Visual APE 11/26/2025
Local Government Involvement Attach9 - Local Gov 11/26/2025
Public Involvement Attach10 - PN 11/26/2025
State-Specific Forms Attach11 - SHPO Specific Forms 11/26/2025
FCC Form 620
May 2014
13 of 13
ATTACHMENT 1. CONSULTANT INFORMATION
Provide a current copy of the resume or curriculum vitae for the Principal Investigator and any
researcher or other person who contributed to, reviewed, or provided significant input into the
research, analysis, writing or conclusions presented in this filing.
A current copy of the resume for the Principal Investigator and any researcher or other person
who contributed to, reviewed, or provided significant input into the research, analysis, writing,
or conclusions presented in this filing.
HANNAH DELL
ASSISTANT PROJECT MANAGER
Education
Biology, B. S.
University of North Georgia / Gainesville, GA
Areas of Expertise
Ms. Dell has experience performing site inspections and conducting environmental due diligence pursuant
to EPA All Appropriate Inquiries (AAI) and the American Society of Testing and Materials (ASTM) for
commercial real estate and lending projects. Additionally, Ms. Dell has experience performing National
Environmental Policy Act (NEPA) reviews for wireless telecommunications projects.
Environmental service expertise includes:
Phase I Environmental Site Assessments
Historical City Directories
Information Section 7 Consultation
National Wetland Inventory Maps
Flood Insurance Rate Maps
Critical Habitat Maps
Environmental Evaluation Summaries
Archaeological and Architectural Impacts
Soil Characterization
Field Reconnaissance
Section 106 Compliance
NEPA Environmental Assessments
Migratory Bird Evaluations
Form 620/621 Submittals
Historical Topographic Maps and Aerial Imagery
Local Government Consultation
Native American Consultation
Land Use History
Certifications/Affiliations
ANSI/FCC RF Radiation Safety Competent Person
Basic Wetland Delineation (2023)
Professional Resume
ATTACHMENT 2. SITE INFORMATION – PHOTOGRAPHS
You are required to provide photographs and maps as part of this filing. Additional site information can
be provided in an optional attachment.
Photograph Requirements:
Except in cases where no Historic Properties were identified within the Areas of Potential Effects, submit
photographs as described below. Photographs should be in color, marked so as to identify the project, keyed
to the relevant map or text, and dated; the focal length of the lens and the height of the camera should be
noted. The source of any photograph included but not taken by the Applicant or its consultant (including
copies of historic images) should be identified on the photograph.
a. Photographs taken from the site should show views from the proposed location
in all directions. The direction (e.g., north, south, etc.) should be indicated on each
photograph, and, as a group, the photographs should present a complete (360 degree)
view of the area around the proposed site.
Please reference the following directional photographs of the project area, which were
taken by Jason C. Flay on October 07, 2025, unless otherwise noted.
b. If any listed or eligible properties are visible from the proposed site,
photographs looking at the site from each historic property. The approximate distance
in feet (meters) between the site and the historic property should be included. If any
listed or eligible properties are within the APE, photos looking at each historic property
should be included.
N/A
c. Photographs of all listed in and eligible properties within the Areas of Potential
Effects.
Aerial photographs of the site were obtained via Google Earth, imagery is dated to 2024.
View west, of APE-DE
View north from APE
View east from APE
View south from APE
View west from APE
Please refer to Appendix B for Site Maps
ATTACHMENT 3. SITE INFORMATION – MAP REQUIREMENTS
Include one or more 7.5-minute quad USGS topographical maps that:
a. Identify the Areas of Potential Effects for both Direct and Visual Effects. If a map is
copied from the original, include a key with the name of quad and date.
b. Show the location of the proposed site and any access roads or other easements
including excavations.
c. Show the locations of each property listed.
d. Include keys for any symbols, colors, or other identifiers.
e. Submit color maps whenever possible.
The following maps have been attached to this report:
• Site Vicinity Map
• 7.5-min Topographic Quad Map with Project Location, 2025
• Aerial Map
• Modern Soil Map with Project Location
• Historic Resources Buffer Map
Please refer to Appendix B for Site Maps
7.5-min Topographic Quad Map with Project Location, 2025
Aerial Map
Modern Soil Map with Project Location
Historic Resources Map
ATTACHMENT 4. SITE INFORMATION – ADDITIONAL SITE
INFORMATION
Describe any additional structures, access roads, utility lines, fences, easements, or other
construction planned for the site.
The project consists of construction of a 279-foot Self-Support Communications Tower, with an
overall height of 283 feet and associated equipment within a 50-foot by 50-foot fenced area within
a 75-foot by 75-foot (5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive
within an access/utility easement, measuring 30 feet wide, extending approximately 20 feet
generally northeast away from the lease area towards Camden Highway. The project area is
located in an agricultural field covered in crops. The total area of disturbance is 0.14 acre (0.0567
hectares).
Please refer to Appendix A for Site Plans
ATTACHMENT 5. AREA OF POTENTIAL EFFECTS
You ar
e required to provide two attachments regarding the Determination of Effect: Areas of
Potential Effect and Mitigation of Effect (if applicable).
AREAS OF POTENTIAL EFFECT GUIDELINES:
a. Describe the APE for direct effects and explain how this APE was determined.
Under the NPA for FCC Projects, the Direct APE (APE-DE) "is defined as the area of
potential ground disturbance and any property, or any portion thereof that will be physically
altered or destroyed by the undertaking" (FCC 2004). On November 24, 2008, the FCC
further clarified
that the APE-DE is limited to the tower or non-tower structure on which the
collocation will be mounted and the lease area, including the access route and utility
corridor. The APE -DE is located in a previously undeveloped area. The APE -DE comprises
the lease parcel for the construction of the proposed cellular tower, the turnaround area, and
access road. The proposed ground disturbance should be restricted to the lease parcel.
b. Describe the APE for visual effects and explain how this APE was determined.
Per the NPA, the Visual APE (APE-VE) is the "geographic area in which the project has the
potential to introduce visual elements that diminish or alter the setting, including the
landscape, where the setting is a character-defining feature of a historic property that makes
it eligible for listing on the National Register of Historic Places (NRHP)" (FCC 2004). The
presumed APE-VE for construction of new facilities is the area from where the tower will be
visible: a. Within a ½ mile from the tower site if the proposed tower is 200 feet or less; b.
Within ¾ of a mile from the tower site if the proposed tower is more than 200 but no more
than 400 feet in overall height; or c. Within 1½ miles from the tower site if the proposed tower is
more
than 400 feet in overall height.
Takin
g into consideration the maximum height of the proposed undertaking (283 feet) and
the minimal scale of the installation, Acheulean determined that the current project's APE
for visual effects will encompass a 0.75-mile radius from the subject property.
ATTACHMENT 5. CONTINUED
MITIGATION OF EFFECT GUIDELINES:
In the case of where an Adverse Visual Effect or Adverse Direct Effect has been determined you
must provide the following:
a. Copies of any correspondence and summaries of any oral communication with the
SHPO/THPO and any consulting parties.
N/A
b. Describe any alternatives that have been considered that might avoid, minimize, or
mitigate any adverse effects. Explain the Applicant 's conclusion regarding the feasibility
of each alternative.
N/A
For each property identified as a Historic Property in the online e-106 form:
a. Indicate whether the Applicant believes the proposed undertaking would have a) no effect;
b) no adverse effect; or, c) an adverse effect. Explain how each such assessment was made.
Provide supporting documentation where necessary.
Acheulean Principal Investigator Jason Flay performed this survey in response to the planned
use of the above-described parcel and the potential impacts of such use on any archaeological
and architectural cultural resources within the project area. Jason Flay meets the Secretary of
the Interior's Historic Preservation Professional Qualifications Standards for Archaeology.
Background research, including a review of archival sources, was conducted for the current
project location prior to the initiation of field investigations. The aim of this research was to
determine the likelihood of encountering sensitive historic propert ies within the current
project area. A review of previously recorded archaeological sites and surveys was conducted
using the South Carolina ArchSite system on October 05, 202 5. This study identified any
previous archaeological investigations, previously recorded archaeological sites within a 1-
mile buffer, and previously recorded historic resources within a 0.75-mile buffer of the APE-
DE.
ATTACHMENT 5. CONTINUED
A review of the South Carolina ArcSite Historic Resources Inventory Map, and through the
National Register Information System website (http://www.nr.nps.gov/) was conducted on October
05, 2025.
There are 0 Historic Districts and 0 individual property within the 0.75-mile buffer of the APE -
DE. Of the resources, 0 districts and 0 individual properties are NRHP-eligible or -listed.
There is 1 Below-Ground resources identified in the 1-mile buffer, 0 are NRHP eligible or listed.
It is determined that there are No Historic Properties in the APE-DE or APE-VE.
Please see the attached Cultural Resources Survey Report for additional information.
A PHASE I CULTURAL RESOURCE
INVESTIGATION
FOR
BORDEN
,
REMBERT
,
SUM
TER
COUNTY,
SC
T
RILEAF
N
UMBER
:
772867
APN:
CR
-
202
5
-
0
84
JASON
C
.
FLAY
,
MA
, RPA
ACHEULEAN CONSULTING
1503 Cypress St. Paris, KY 40361
OCTOBER
11
, 202
5
Ph. 315
-
292
-
0563
www.acheuleanconsulting.com
A Phase I Cultural Resource Investigation
For Borden,
Rembert, Sumter County, SC
Submitted by:
Acheulean Consulting
1503 Cypress St.
Paris
, KY 40
361
Prepared for:
Trileaf
Lead Agency:
Federal Communications Commission
October 11, 2025
_______________________________________
Jason C. Flay, MA, RPA
Principal Investigator
Contact
AcheuleanConsulting@gmail.com
315
-
292
-
0563
www.acheuleanconsulting.com
Trileaf
:
772867
APN:
CR
-
202
5
-
0
84
1775 The Exchange SE, Suite 525
Atlanta, GA 30339
ABSTRACT
T
his is an abbreviated technical report describing a no
-
find survey from a Phase I archaeological
investigation
conducted
on
October 7, 2025
.
Trileaf contacted Acheulean Consulting (Acheulean) to conduct a Phase I archaeological survey for a
proposed cellular tower project in Rembert, SC 34.067385, -80.509680 (34° 4’ 2.5868 N, 80° 30’ 34.8467”
W )). The project is Borden, Project Number 772867 , located at Camden Highway , Rembert, Sumter
County , South Carolina . The proposed ground disturbance should be restricted to the lease parcels. The
total acreage of the new construction area is approximately 0.14 acre (0.0567 hectares) (Fig. 1.1 ).
The archaeological survey involved a visual inspection of the entire APE
-
DE for prehistoric or historic
features or materials. Acheulean determined that
five shovel
tests within the lease area would efficiently
cover the project area (
Fig. 3.2
). Each STP was excavated no less than 35 cm in diameter to a depth of no
less than 20 cm into the subsoil. All soils were screened through a ¼" mesh. Photographs and GPS points
were taken
.
No further archaeological work is recommended within the APE
-
DE
,
and construction may proceed as
planned.
Table of Contents
1.0 Introduction ............................................................................................................................................ 1
1.1. Regulatory Authority
................................
................................
................................
.........................
1
1.2 Purpose and Scope of Work
................................
................................
................................
...............
1
1.3 Project Area Description
................................
................................
................................
....................
2
1.4 Environmental Setting
................................
................................
................................
........................
5
1.5 Records Search
................................
................................
................................
................................
....
5
1.6 Project Staff and Principal Investigator
................................
................................
..............................
6
1.7 Curation
................................
................................
................................
................................
..............
6
2.0 Previous Investigations and Summary of Known Sites .......................................................................... 7
2.1 Historical Documentation
................................
................................
................................
..................
7
2.2 Previous Archaeological Investigations
................................
................................
...............................
7
2.3 Known Archaeological Sites
................................
................................
................................
...............
7
2.4 Historic Resources
................................
................................
................................
..............................
8
3.0 Methods and Results .............................................................................................................................. 9
3.1 Implemented Field Methods
................................
................................
................................
..............
9
3.1.2 Visual Inspection
................................
................................
................................
........................
10
3.2 Evaluation of Field Methods
................................
................................
................................
............
13
4.0 Summary and Recommendations ......................................................................................................... 14
4.1 Summary
................................
................................
................................
................................
...........
14
4.2 Recommendations
................................
................................
................................
............................
14
5.0 References ............................................................................................................................................. 15
Engineering Plans ....................................................................................................................................... 16
List of Figures
Fig. 1.1
-
Project Location Map
................................
................................
................................
.....................
3
Fig. 1.2
–
Project Aerial Map
................................
................................
................................
.........................
4
Fig. 1.3
–
Soils within the APE
-
DE
................................
................................
................................
...............
5
Fig. 2.1
–
Historic Resources Inventory Map
................................
................................
................................
..
8
Fig. 3.1
–
Representational STP Soil Drawing
................................
................................
..............................
10
Fig. 3.2
–
Representational STP
................................
................................
................................
...................
10
Fig. 3.3
-
View west, of APE
-
DE
................................
................................
................................
.................
11
Fig. 3.4
–
View north from APE
-
DE
................................
................................
................................
...........
11
Fig. 3.5
-
View east from APE
-
DE
................................
................................
................................
..............
12
Fig. 3.6
-
View south from APE
-
DE
................................
................................
................................
............
12
Fig. 3.7
-
View west from APE
-
DE
................................
................................
................................
.............
13
Page |
1
1.0
INTRODUCTION
Th
is
is an
abbreviated technical report describing a no
-
find survey from a Phase I archaeological
investigation conducted
on
October 07, 2025
.
Trileaf contacted Acheulean Consulting (Acheulean) to conduct a Phase I archaeological survey for a
proposed cellular tower project
in
Rembert
,
SC
(
34.067385,
-
80.509680
(
34° 12' 56.55" N 80° 42' 30.05"
W))
. The project
is
Borden
, Project Number
772867
,
located at
Camden Highway
,
Rembert
,
Sumter
County
,
SC
29128
(
Fig. 1.1
).
Per Section VI.D.2 of the Federal Communications Commission
'
s (FCC) 2004 Nationwide Programmatic
Agreement,
Acheulean
conducted a field survey to identify any archaeological or historic properties that
may lie within the Area of Potential Effects
-
Direct Effects (APE
-
DE). The FCC has defined the APE
-
DE as
"
the area of potential ground disturbance and any property, or any portion thereof, [which] will be
physically altered or destroyed by the undertaking.
"
Areas outside of the lease
parcel
,
access
,
and utilit
y
easements
,
as shown on the project plans (buffer zones)
,
were not surveyed because these areas are not part
of the APE
-
DE
,
and the applicant
does not have
permission
or
legal or financial arrangement with the
property owner to use
and/
or modify those areas.
The APE
-
DE is located in a previously undeveloped area. The APE
-
DE comprises the lease parcel for the
construction of the proposed cellular tower, the turnaround area, and access road. The proposed ground
disturbance should be restricted to the lease parce
ls.
1.1.
Regulatory Authority
The
F
ederal
A
gency overseeing the survey is the
Federal Communications Commission (
FCC
)
.
The survey
was conducted in compliance with guidelines established by the
South Carolina Institute of
Archaeology
and Anthropology (SCAII)
, various interested THPOs, the National Historic Preservation
A
ct of 1966
(P
L
89
-
655; 80 Stat. 915, 16 U
S
C 470 et seq), the National Environmental Policy Act of 1969 (PL 910190;
83 Stat. 852, 42 U
SC
4321 et seq) Procedures of the Advisory Council on Historic Preservation
(36CFR800), Executive Order 11593, Protection and Enhancement of the Cultural Environment (16 U
SC
470; sup. 1, 1971).
1.2
Purpose and Scope of Work
As technology progresses in t
elecommunications, more stress is
put on wireless communications and
wireless internet bandwidth.
T
owers and ancillary tower facilities must be
maintained
to fulfill the need.
To facilitate this, the client intends
to
construct a
new with attachments.
The archaeological field crew was
tasked with
performing a visual inspection
and shovel testing
areas of less
than 15% slope that w
as
not previously disturbed by construction activity and
visually inspect
ing
the entire
Page |
2
project
area. The purpose of this work was to identify any archaeological resources which might have existed
within the APE
-
DE and to record their extent, significance, and the potential impact of the proposed
project on these cultural resources.
1.3
Project Area Description
The project is Borden, Project Number 772867, located at Camden Highway , Rembert, SC 39739 located
on the Rembert, SC Quadrangle USGS 7.5' topographical map (34.067385, -80.509680 (34° 4’ 2.5869”
N, 80° 30’ 34.8467” W )).
The project consists of building a 279 -foot lattice tower with antenna extending to a height of 283 -feet.
The tower is located on a 75-foot x 75 -foot lease area at the western end of an approximately 50’-foot by
30’ access road extending west from Camden H ighway in Borden, Sumter County, SC (34.067385, -
80.509680 (34° 4’ 2.5868” N, 80° 30’ 34.8467” W)). The project area is located in an agricultural field
covered in crops. The total area of disturbance is 0.14 acre (0.0567 hectares). (Fig. 1.1 - 2).
Page |
3
Fig.
1.
1
-
Project
Location
Map
Page |
4
Fig. 1.2
–
Project
Aerial Map
Page |
5
1.4 Environmental Setting
The APE
-
DE is in the
Sand Hills
region of the
Atlantic Plain
physiographic zone.
The
Atlantic Plain
is
made up of sandy beaches, marshlands, bays, and barrier islands. It is the flattest of the U.S. physiographic
divisions and stretches over 2,200 miles (3,500 km) in length from Cape Cod to the Mexican border and
southward an additional 1,000 miles (1,600
km) to the Yucatán Peninsula.
(NRCS 202
5
).
The predominate soils are
DoB
—
Dothan
-
Norfolk complex, 2 to 6 percent slopes
. “
The Dothan series
consists of very deep, well drained soils that formed in thick beds of unconsolidated, medium to fine
-
textured marine sediments. Dothan soils are on interfluves. Slopes range from 0 to 15 percent. Mean
annual temperature is about 18 degre
es C (65 degrees F), and the mean annual precipitation is about
1360 millimeters (53 inches).
” (
NRCS 202
5
).
Fig. 1.
3
–
Soils within the APE
-
DE
1.5
Records Search
A review of the
South Carolina ArcSite
Historic Resources Inventory Map, and through the National Register
Information System website (http://www.nr.nps.gov/) was conducted on
October 05
, 202
5
.
Page |
6
There
are
0
Historic Districts and
0
individual
property
within the 0.5
-
mile buffer of the APE
-
DE. Of the
resources,
0
district
s
and
0
individual properties are
NRHP
-
eligible or
-
listed.
There
is
1
Below
-
Ground
resources identified in the 1
-
mile buffer,
0
are NRHP eligible or listed
.
I
t is recommended that project will have
No Effect
on any
Historic Properties
in the APE
-
DE
and
APE
-
VE.
This will be discussed further in
Section 2.3 Known Archaeological Sites
.
1.6
Project Staff and Principal Investigator
T
he
Principal Investigator for this project
is Jason C. Flay, MA, RPA
. He holds an MA in Archaeology
and Heritage from the University of Leicester and a BA
in Anthropology
from the University of Kansas.
Jason C. Flay
has conducted archaeological fieldwork for
over 20
years and
has been researching and writing
archaeological reports for
over 1
0
years.
1.7
Curation
There are no artifacts to curate. Field notes and a copy of this report will be
filed
at the office of
Acheulean
Consulting
at
1503 Cypress St
reet
,
Paris
, KY 40
361
.
Page |
7
2.0
PREVIOUS INVESTIGATIONS AND SUMMARY OF
KNOWN SITES
2.1 Historical Documentation
A review of historic maps was conducted online, including:
Hagood
,
SC
1:
62
,
5
00 (19
38
),
Hagood
,
SC
1:
62
,
5
00
(19
45
)
,
Rembert
,
SC
1:
24,000
(
19
57
)
USGS topographic maps
.
The area has been undeveloped throughout the 20
th
and 21
st
century
.
2.2 Previous Archaeological Investigations
Report
Number
Title
Author
Report
Date
N/A
Cultural Resources Survey of a 10.22
-
Kilometer Section of US 521 for the
South Carolina Department of Transportation's Rural Roads Safety Project
Baluha and
Dantuma
2023
2.3 Known Archaeological Sites
Site_#
Site Name
Site Type
Date
NR Status
38SU1130
5260
-
4 (Mt. Pisgah MBC
Cemetery)
African American Cemetery
1882
-
pres
Not Eligible
Page |
8
2.4 Historic Resources
Fig. 2.1
–
Historic Resources Inventory Map
Inventory
ID
Address
National Register Status
Name
Resource
Category
Date
Built
N/A
N/A
N/A
N/A
N/A
N/A
Project #
and Status
of Subject
Property
Photograph of Subject Property
Description of Subject
Property
Summary of
Effects on
Subject
Property
N/A
N/A
N/A
N/A
Page |
9
3.0
METHODS AND RESULTS
In this section, the field methods employed
during
this study are described. These methods include
fieldwork
activities, their application in different portions of the project, reflection upon conditions
encountered, and an evaluation of their effectiveness.
Fieldwork was conducted
on
October 07, 2025
.
3.1 Implemented Field Methods
Fieldwork was conducted per the guidelines established by the
South Carolina
Institute of Archaeology
and Anthropology
(
SCIAA
), and guidelines from Tribal Historic Preservation Offices (THPOs) interested
in the conducted work.
Before conducting the survey, test points were plotted at 15
-
meter (50
-
foot) intervals throughout the APE
-
DE. Crews were prepared to excavate STPs on slopes less than 15%. A 1
-
in
diameter soil probe was used
in areas to determine the presence and extent of disturbed soils. The archaeological survey involved a visual
inspection of the entire APE
-
DE for prehistoric or historic features or materials. Acheulean determined
that
five shovel
tests within the lease area would efficiently cover the project area (
Fig
. 3.2
). Each STP was
excavated no less than 35 cm in diameter to a depth of no less than 20 cm into the subsoil. All soils were
screened through a ¼" mesh. Photographs and GPS points were taken.
No cultural material
or features were
discovered during this archaeological survey. Total archaeological field
time: 1 person, 2 hours.
Based on the findings of this survey, Acheulean
is determined that there are No Historic Properties in the
APE
-
DE or APE
-
VE.
It is therefore recommended that project clearance be granted with no further
investigation or evaluation of the project area.
Page |
10
3.1.1 Shovel Testing/ Geomorphological Sampling
10
Y
r
4/4
S
aLo
1
8
cm
10
Y
r
4/5
S
iLo
43
cm
STP 4
Fig
.
3.1
–
Representational STP Soil Drawing
Fig
.
3.2
–
Representational STP
3.1.2 Visual Inspection
The entire APE
-
DE was walked to identify the presence of archaeological materials
and/
or features
; none
were identified.
Photographs of the surrounding areas were taken with corresponding GPS points.
Page |
11
Fig. 3.3
-
View
west
,
of APE
-
DE
Fig
.
3.4
–
View
north from
APE
-
DE
Page |
12
Fig
.
3.5
-
View
east
from APE
-
DE
Fig
.
3.6
-
View
south
from APE
-
DE
Page |
13
Fig. 3.7
-
View
west
from APE
-
DE
3.2 Evaluation of Field Methods
South Carolina Institute of Archaeology and Anthropology (SCIAA)
, and guidelines from Tribal Historic
Preservation Offices (THPOs) interested in the conducted work.
The fieldwork did not identify any
cultural material within the APE
-
DE.
Page |
14
4.0 SUMMARY AND RECOMMENDATIONS
4.1 Summary
This is an
abbreviated technical report describing a no
-
find survey from a Phase I archaeological
investigation conducted on
October 07, 2025
.
Trileaf contacted Acheulean Consulting (Acheulean) to conduct a Phase I archaeological survey for a
proposed cellular tower project
in
Rembert
,
SC
(30.5823612°,
-
89.0749278
(30
34’56.05”, 89
04
'29.74").
The project is
Borden
, Project Number
772867
,
located at
Camden Highway
,
Rembert
,
Sumter County
,
South Carolina
(
Fig. 1.1
).
The archaeological survey involved a visual inspection of the entire APE
-
DE for prehistoric or historic
features or materials. Acheulean determined that
five shovel
tests within the lease area would efficiently
cover the project area (Fig. 3.2). Each STP was excavated no less than 35 cm in diameter to a depth of no
less than 20 cm into the subsoil. All soils were screened through a ¼" mesh. Photographs and GPS points
were taken
. No archaeological materials or features were identified.
No further archaeological work is recommended within the APE
-
DE.
4.2 Recommendations
Based on the findings of this survey,
Acheulean
determined
that the project will have
n
o
e
ffect
as there are
No
Historic Properties
in the APE
-
DE and APE
-
VE
.
Due to the research and field data, i
t is therefore
recommended that
clearance be granted with no further investigation or evaluation of the project area
.
Page |
15
5.0 REFERENCES
NRCS
202
5
. Natural Resources Conservation Service,
Web Soil Survey
, United States Department of
Agriculture, http://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.
S
tewart, R.A.
20
0
4
,
South Carolina Physiographic Provinces
,
United States Geological Society,
Accessed
10
/
0
7/202
5
USGSa.
202
5
.
Rembert
,
SC
1:24,000,
United States Geological Survey, Accessed
10
/
0
7
/202
5
,
https://ngmdb.usgs.gov/topoview/viewer/#14/31.7105/
-
89.0932
Page |
16
ENGINEERING PLANS
Page |
17
ATTACHMENT 6. TRIBAL AND NHO INVOLVEMENT
At an early stage in the planning process, the Nationwide Agreement requires the Applicant
to gather information from appropriate Indian Tribes or Native Hawaiian Organizations
("NHOs") to assist in the identification of Historic Properties of religious and cultural
significance to them. Describe measures taken to identify Indian tribes and NHOs that may
attach religious and cultural significance to Historic Properties that may be affec ted by the
construction within the Areas of Potential Effects ("APE") for direct and visual effects. If such
Indian tribes or NHOs were identified, list them and provide a summary of contacts by either
the FCC, the Applicant, or the Applicant 's representative. Provide copies of relevant
documents, including correspondence. If no such Indian tribes or NHOs were identified,
please explain.
Trileaf Corporation completed the Tower Construction Notification System (TCNS) on
September 16, 2025, and received the notification of interested tribes on September 19, 2025. The
attached FCC Notification email lists the Tribes identified through the TCNS process. A second
notice will be sent to all interested tribes/organizations, after a period of 30 days and the
consultation process will continue per the FCC's guidelines. Any relevant comments from Tribes
received by Trileaf will be forwarded to your office.
1
Michael Romanoski
From: towernotifyinfo@fcc.gov
Sent: Friday, September 19, 2025 2:02 AM
To: Tribal
Cc: tcnsweekly@fcc.gov
Subject: NOTICE OF ORGANIZATION(S) WHICH WERE SENT PROPOSED TOWER CONSTRUCTION
NOTIFICATION INFORMATION - Email ID #9325921
Categories: Mike
CAUTION: This email originated from outside of the organiza. on. Do not click links or open aƩachments unless you
recognize the sender and know the content is safe.
Dear Applicant:
Thank you for using the Federal CommunicaƟons Commission's (FCC) Tower ConstrucƟon NoƟficaƟon System
(TCNS). The purpose of this electronic mail message is to inform you that the following authorized persons were sent the
noƟficaƟon that you provided through TCNS, which relates to your proposed antenna structure. The informaƟon was
forwarded by the FCC to authorized TCNS users by electronic mail and/or regular mail (leƩer). We note that the review
period for all parƟes begins upon receipt of the Submission Packet pursuant to SecƟon VII.A of the NPA and noƟficaƟons
that do not provide this serve as informaƟon only.
Persons who have received the noƟficaƟon that you provided include leaders or their designees of federally-
recognized American Indian Tribes, including Alaska NaƟve Villages (collecƟvely "Tribal NaƟons"), NaƟve Hawaiian
OrganizaƟons (NHOs), and State Historic PreservaƟon Officers (SHPOs). For your convenience in idenƟfying the
referenced Tribal NaƟons and NHOs and in making further contacts, the City and State of the Seat of Government for
each Tribal NaƟon and NHO, as well as the designated contact person, is included in the lisƟng below. We note that
Tribal NaƟons may have SecƟon 106 cultural interests in ancestral homelands or other locaƟons that are far removed
from their current Seat of Government. Pursuant to the Commission's rules as set forth in the NaƟonwide ProgrammaƟc
Agreement for Review of Effects on Historic ProperƟes for Certain Undertakings Approved by the Federal
CommunicaƟons Commission (NPA), all Tribal NaƟons and NHOs listed below must be afforded a reasonable opportunity
to respond to this noƟficaƟon, consistent with the procedures set forth below, unless the proposed construcƟ
on falls
within an exclusion designated by the Tribal NaƟon or NHO. (NPA, SecƟon IV.F.4).
The noƟficaƟon that you provided was forwarded to the following Tribal NaƟons and NHOs. A Tribal NaƟon or
NHO may not respond unƟl a full Submission Packet is provided. If, upon receipt, the Tribal NaƟon or NHO does not
respond within a reasonable Ɵme, you should make a reasonable effort at follow-up contact, unless the Tribal NaƟon or
NHO has agreed to different procedures (NPA, SecƟon IV.F.5). In the event a Tribal NaƟon or NHO does not respond to a
follow-up inquiry, or if a substanƟve or procedural disagreement arises between you and a Tribal NaƟon or NHO, you
must seek guidance from the Commission (NPA, SecƟon IV.G). These procedures are further set forth in the FCC's Second
Report and Order released on March 30, 2018 (FCC 18-30).
1. TCNS Rep Bryan Printup - Tuscarora NaƟon - 5226 Walmore Rd Via: Lewiston, NY - bprintup@heƞ.org - 716-264-
6011 (ext: 103) - electronic mail
2
If the applicant/tower builder receives no response from the Tuscarora NaƟon within 30 days aŌer noƟficaƟon
through TCNS, the Tuscarora NaƟon has no interest in parƟcipaƟng in pre-construcƟon review for the proposed site. The
Applicant/tower builder,
however, must immediately noƟfy the Tuscarora NaƟon in the event archaeological properƟes or human remains
are discovered during construcƟon, consistent with SecƟon IX of the NaƟonwide ProgrammaƟc Agreement and
applicable law.
2. THPO Noah C White III - Prairie Island Indian Community - 5636 Sturgeon Lake Road Welch, MN -
celltower@piic.org - 651-385-4175 - electronic mail
If the applicant/tower builder receives no response from the Prairie Island Indian Community within 30 days aŌer
noƟficaƟon through TCNS, the Prairie Island Indian Community has no interest in parƟcipaƟng in pre-construcƟon review
for the proposed site. The Applicant/tower builder,
however, must immediately noƟfy the Prairie Island Indian Community in the event archaeological properƟes or
human remains are discovered during construcƟon, consistent with SecƟon IX of the NaƟonwide ProgrammaƟc
Agreement and applicable law.
3. Gwen Terrapin - Cherokee NaƟon - (PO Box: 948) Tahlequah, OK - historicpreservaƟon@cherokee.org; gwen-
terrapin@cherokee.org - 918-772-4165 - electronic mail
Exclusions: Please email all review documents for FCC Form 620/621 (i.e. archeologist report, photos, SHPO response,
etc.) to historicpreservaƟon@cherokee.org or gwen-terrapin@cherokee.org. You may also mail a cover leƩer and a CD
or flash drive containing the review documents and FCC forms to: Cherokee NaƟon: AƩn: Gwen Terrapin, PO Box 948,
Tahlequah, OK 74465. Should you have any quesƟons, please do not hesitate to email or call 918.772.4165.
Wado,
Cherokee NaƟon
4. Director Lora Nuckolls - Eastern Shawnee Tribe of Oklahoma - 70400 East HWY 60 WyandoƩe, OK -
celltower@estoo.net - 918-238-5151 (ext: 1840) - regular mail
Exclusions: Submit one printed color copy by US postal mail or other parcel carrier of all documentaƟon to:
Eastern Shawnee Tribe
AƩn: Cell Tower Program
70500 E. 128 Rd.
WyandoƩe, OK 74370
Provide a 1-page cover leƩer with the following informaƟon:
a. TCNS Number
b. Company Name
c. Project Name, City, County, State
d. Project type
3
e. Project coordinates
f. Contact informaƟon
The Eastern Shawnee Procedures document is available and highly recommended for guidance; send an email to
celltower@estoo.net requesƟng our most current copy.
If the applicant/tower builder receives no response from the Eastern Shawnee Tribe of Oklahoma within 30 days
aŌer noƟficaƟon through TCNS, the Eastern Shawnee Tribe of Oklahoma has no interest in parƟcipaƟng in pre-
construcƟon review for the proposed site. The Applicant/tower builder,
however, must immediately noƟfy the Eastern Shawnee Tribe of Oklahoma in the event archaeological properƟes or
human remains are discovered during construcƟon, consistent with SecƟon IX of the NaƟonwide ProgrammaƟc
Agreement and applicable law.
5. Mekko Ryan Morrow - Thlopthlocco Tribal Town - P .O. Box 188 Okemah, OK - thpo@Ʃtown.org - 000-000-0000 -
electronic mail
Exclusions: Thlopthlocco Tribal Town requests that all iniƟal review materials required by applicable law be submiƩed by
email directly to thpo@Ʃtown.org. In addiƟon, in the event archeological or cultural materials or human remains are
discovered at any Ɵme during this undertaking, please noƟfy Thlopthlocco Tribal Town immediately.
6. THPO and ExecuƟve Director Dr. Wenonah G Haire DMD - Catawba Indian NaƟon - 1536 Tom Steven Road
Catawba Cultural Center Rock Hill, SC - Wenonah.Haire@catawba.com; Caitlin.Rogers@catawba.com - 803-417-9057 -
regular mail
Exclusions: Please do not email documentaƟon; it will be deleted without being opened. Mail one printed color copy of
all documentaƟon to address:
Dr. Wenonah G. Haire
Tribal Historic PreservaƟon Office
1536 Tom Steven Road
Rock Hill, SC 29730
Please submit by US Postal mail or other parcel carrier complete informaƟon for all telecommunicaƟon projects:
1. Please provide 1 page cover leƩer with following informaƟon
a. TCNS Number
b. Company Name
c. Project Name, City, County, State
d. Project Type
e. Project coordinates
f. Contact informaƟon
2. We also request photographs of project area, previous land use history and copy of SHPO LeƩer.
If yo
u have any quesƟons about our process or Ɵmeline of project noƟficaƟons you can email Caitlin Rogers at
Caitlinh@ccppcraŌs.com
4
The noƟficaƟon that you provided was also forwarded to the following SHPOs in the State in which you propose
to construct and neighboring States. The informaƟon was provided to these SHPOs as a courtesy for their informaƟon
and planning. You need make no effort at this Ɵme to follow up with any SHPO that does not respond to this
noƟficaƟon. Prior to construcƟon, you must provide the SHPO of the State in which you propose to construct (or the
Tribal Historic PreservaƟon Officer, if the project will be located on certain Tribal lands), with a Submission Packet
pursuant to SecƟon VII.A of the NPA unless the project is excluded from SHPO review under SecƟon III D or E of the NPA.
7. Environmental Review Coordinator Renee GledhillEarley - NC State Historic PreservaƟon Office - 4617 Mail Service
Center Raleigh, NC - renee.gledhill-earley@ncmail.net - 919-733-4763 - electronic mail
8. Deputy SHPO David Brook - Historic PreservaƟon Office - 4610 Mail Service Center Raleigh, NC -
david.brook@ncmail.net - 919-807-7283 - electronic mail
9. Project Review Coordinator John Sylvest - Department of Archives and History - 8301 Parklane Road Columbia, SC
- jsylvest@scdah.sc.gov - 803-896-6129 - electronic mail
TCNS automaƟcally forwards all noƟficaƟons to all Tribal NaƟons and SHPOs that have an expressed interest in
the geographic area of a proposal. However, if a proposal for PTC wayside poles falls within a designated exclusion, you
need not expect any response and need not pursue any addiƟonal process with that Tribal NaƟon or SHPO. In addiƟon, a
parƟcular Tribal NaƟon or SHPO may also set forth policies or procedures within its details box that exclude from review
certain faciliƟes (for example, a statement that it does not review collocaƟons with no ground disturbance; or that
indicates that no response within 30 days indicates no interest in parƟcipaƟng in pre-construcƟon review).
Please be advised that the FCC cannot guarantee that the contact(s) listed above have opened and reviewed an
electronic or regular mail noƟficaƟon. If you learn that any of the above contact informaƟon
is no longer valid, please
contact the FCC by emailing tcnshelp@fcc.gov. The following informaƟon relaƟng to the proposed tower was forwarded
to the person(s) listed above:
NoƟficaƟon Received: 09/16/2025
NoƟficaƟon ID: 301523
Excluded from SHPO Review: No
Tower Owner Individual or EnƟty Name: Harmoni Towers, LLC
Consultant Name: Michael Romanoski
Street Address: 1515 Des Peres Rd. Ste 200
Suite 200
City: St. Louis
State: MISSOURI
Zip Code: 63131
Phone: 314-997-6111
5
Email: tribal@trileaf.com
Structure Type: LTOWER - Laƫce Tower
LaƟtude: 34 deg 4 min 2.6 sec N
Longitude: 80 deg 30 min 34.8 sec W
LocaƟon DescripƟon: Camden Highway
City: Rembert
State: SOUTH CAROLINA
County: SUMTER
Detailed DescripƟon of Project: Harmoni Towers LLC proposes to construct a 279-foot Self-Support CommunicaƟons
Tower, with an overall height of 283 feet and associated equipment within a 75-foot by 75-foot (5,625-square-foot) lease
area.
Ground ElevaƟon: 73.7 meters
Support Structure: 85.0 meters above ground level
Overall Structure: 86.3 meters above ground level
Overall Height AMSL: 160.0 meters above mean sea level
If you have any quesƟons or comments regarding this noƟce, please contact the FCC using the electronic Help Request
form located on the FCC's website at:
hƩps://urldefense.proofpoint.com/v2/url?u=hƩps-3A__www.fcc.gov_wireless_available-2Dsupport-
2Dservices&d=DwIFaQ&c=euGZstcaTDllvimEN8b7jXrwqOf-
v5A_CdpgnVfiiMM&r=tVy9dfE6fJUkHc15_Itk39MNoGtgWe1vmeedh3_FbFk&m=xuiZwBxPrrSZc80Qlv-s_t4MZ3-
4W43LAQuZILpwSmamvP77ioLuOxWQSxov-Grt&s=7pP426Lnov_hso07F0PYDL9dZUmZSUhpCoajHchF3q4&e=
You may also call the FCC Support Center at (877) 480-3201 (TTY 717-338-2824). Hours are from 8:00 a.m. to
6:00 p.m. Eastern Time, Monday through Friday (except Federal holidays). To provide quality service and ensure security,
all telephone calls are recorded.
Thank you,
Federal CommunicaƟons Commission
----------
This email has been scanned for spam and viruses by Proofpoint EssenƟals. Visit the following link to report this email as
spam:
hƩps://us1.proofpointessenƟals.com/app/report_spam.php?mod_id=11&mod_opƟon=logitem&report=1&type=easysp
am&k=k1&payload=53616c7465645f5f7c8c95c304975a1603a9de986fdea90adf0ĩcd871dad7a98ec00c339035a5c34f7a
76df77222347df7c3465237ab8fc46265ce14133d361f6cce50718162a0ea8c679559ccbc6ddf26aa1ed0f691d0e004979ce4
2de0733c4257e4c4cf71474817c8e1f4a74eddd5f580a008ac18bddd5d39f3afc95777642632cd41a6f10039b6f4b5b7aa31
62e312a8e8b3c100c584719b434eced4789
ATTACHMENT 7. HISTORIC PROPERTIES DIRECT EFFECTS
a. List all Below-Ground Resources within the APE-DE.
b. Provide the name and address (including U.S. Postal Service ZIP Code) of each property
in the APE for direct effects, not listed in part "a" (above), that the Applicant considers
to be eligible for listing in the National Register because of the Applicant's research.
For each such property, describe how it satisfies the criteria of eligibility (36 C FR Part
63). For each property that was specifically considered and determined not to be
eligible, describe why it does not satisfy the criteria of eligibility.
There are no additional properties in the APE for direct effects not listed in part "a."
Site_# Site Name Site Type Date NR Status
38SU1130 5260-4 (Mt. Pisgah MBC
Cemetery)
African American
Cemetery
1882-pres Not Eligible
ATTACHMENT 7. CONTINUED
a. Describe the techniques and the methodology, including any field survey, used to identify
Historic Properties within the APE for direct effects. 1 If no archeological field survey was
performed, provide a report substantiating that: i) the depth of previous disturbance
exceeds the proposed construction depth (excluding footings and other anchoring
mechanisms) by at least 2 feet; or, ii) geomorphological evidence indicates that cultural
resource-bearing soils do not occur within the project area or may occur but at depths that
exceed 2 feet below the proposed construction depth.
2
Fieldwork was conducted per the guidelines established by the South Carolina Department
of Archives and History , and guidelines from Tribal Historic Preservation Offices (THPOs)
interested in the conducted work.
Before conducting the survey, test points were plotted at 15 -meter (50 -foot) intervals
throughout the APE-DE. Crews were prepared to excavate STPs on slopes less than 15%. A 1
in-diameter soil probe was used in areas to determine the presence and extent of disturbed
soils. The archaeological survey involved a visual inspection of the entire APE -DE for
prehistoric or historic features or materials. Acheulean determined that five shovel tests
within the lease area would efficiently cover the project area (Fig. 3.2). Each STP was
excavated no less than 35 cm in diameter to a depth of no less than 20 cm into the subsoil. All
soils were screened through a ¼" mesh. Photographs and GPS points were taken.
No cultural material was discovered during this archaeological survey. Total archaeological
field time: 1 person, 1 hours.
Based on the findings of this survey, Acheulean recommends that there are No Below-
Ground Historic Properties in the Direct APE. It is therefore recommended that project
clearance be granted with no further investigation or evaluation of the project area related to
those resources.
Please refer to the Cultural Resources Report provided in Attachment 5 for additional
information.
a. Representational Shovel Test Profile
10 Yr 4/4 Sa
18cm
10 Yr 4/5 Sa
1 Pursuant to Section VI.D.2.a. of the Nationwide Agreement, Applicants shall make a reasonable and good faith effort to identify
above ground and archeological Historic Properties, including buildings, structures, and historic districts, that lie within the APE
for direct effects. Such reasonable and good faith efforts may include a field survey where appropriate.
2 Under Section VI.D.2.d. of the Nationwide Agreement, an archeological field survey is required even if none of these conditions
applies, if an Indian tribe or NHO provides evidence that supports a high probability of the presence of intact archeological Historic
Properties within the APE for direct effects.
43cm
STP 4
Fig 7.1 – Representational STP Soil Drawing
Fig 7.2 – Representational STP
ATTACHMENT 8. HISTORIC PROPERTIES VISUAL EFFECTS
Historic Properties Identified for Visual Effects Guidelines
a. Provide the name and address (including U.S. Postal Service ZIP Code) of each property in
the APE for visual effects that is listed in the National Register, has been formally
determined eligible for listing by the Keeper of the National Register, or is id entified as
considered eligible for listing in the records of the SHPO/THPO, pursuant to Section
VI.D.I.a. of the Nationwide Agreement.
A review of the SC ArchSite SHPO database of National Register Sites and Districts, Certified
Local Districts and Architectural Surveys, Archaeology Viewer, National Register Information
System website (http://www.nr.nps.gov/).
b. Provide the name and address (including U.S. Postal Service ZIP Code) of each Historic
Property in the APE for visual effects, not listed in part "a", identified through the
comments of Indian Tribes, NHOs, local governments, or members of the public. Identify
each individual or group whose comments led to the inclusion of a Historic Property in
this attachment. For each such property, describe how it satisfies the criteria of eligibility
(36 CFR Part 63).
N/A
c. For any properties listed in the above Historic Properties list, that the Applicant considers
no longer eligible for inclusion in the National Register, explain the basis for this
recommendation.
N/A
Inventory
ID Address National
Register Status Name Resource Category Date Built
N/A N/A N/A N/A N/A N/A
Project # and Status of
Subject Property
Photograph of Subject Property
N/A
N/A
N/A
ATTACHMENT 9. LOCAL GOVERNMENT
a. If any local government has been contacted and invited to become a consulting party
pursuant to Section V A of the Nationwide Programmatic Agreement, list the local
government agencies contacted. Provide a summary of contacts and copies of any
relevant documents (e.g., correspondence or notices).
On September 22 , 2025, the Sumter County Planning Department was notified of the
proposed project. They have been invited to comment on the proposed project’s potential
effect on Historic Properties and to indicate whether they are interested in consulting
further on the proposed project. A copy of Trileaf Corporation’s correspondence with the
Sumter County Planning Department is attached. As of this date, no response has been
received from the Sumter County Planning Department. Should a response be received, a
copy will be forwarded to all consulting parties as an addendum to this packet.
b. If a local government agency will be contacted but has not been to date, explain why
and when such contact will take place.
N/A
1775 The Exchange SE, Suite 525, Atlanta, GA 30339 - 678-653-8673 - www.trileaf.com
September 22, 2025
Sumte
r County Planning Department
12 West Liberty Street
Sumter, South Carolina, 29150
Phone: (803) 774-1660
Email: planningdepartment@sumtersc.gov
RE: Har
moni Towers LLC – Borden – Client #SC0009812 – Trileaf Project #772867
Camden Highway, Rembert, South Carolina 29128
Sumter County, Rembert Quadrangle (USGS)
Latitude: 34° 4’ 2.5869” N, Longitude: 80° 30’ 34.8467” W
To Whom It May Concern,
Tri
leaf Corporation is in the process of completing a NEPA Review at the referenced property. Our client proposes
to construct a 279- foot Self-Support Communications Tower, with an overall height of 283 feet and associated
equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-square-foot) lease area. The
project includes a 12-foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending
approximately 20 feet generally northeast away from the lease area towards Camden Highway. The proposed
access/utility easement and tower compound lease area are located with an agricultural field. The antenna will be
licensed by the Federal Communications Commission (FCC).
Our
investigation includes determining if the site is contained in, on or within the viewshed of a building, site,
district, structure or object, significant in American history, architecture, archaeology, engineering or culture, that
is listed, or eligible for listing on the State or National Registers of Historic Places, or located in or on an Indian
Religious Site.
Tri
leaf is requesting information regarding this tower’s potential effect on Historic Properties. All information
received will be forwarded to the State Historic Preservation Office (SHPO) as part of the Section 106 review
process. Additionally, this invitation to comment is separate from any local planning/zoning process that may
apply to this project.
If
you wish to comment or be considered a consulting party, please respond within thirty (30) days of the date of
this letter. If a response is not received within thirty (30) days, it will be assumed that you have no objections to
this undertaking. A site topography map and aerial photograph are enclosed for your reference.
Pleas
e call me at (706) 362-1745 or email h.dell@trileaf.com if you need additional information or have any
questions. Thank you for your assistance in this regard.
Sin
cerely,
Hann
ah Dell
Assistant Project Manager
ATTACHMENT 10. OTHER CONSU LTING PARTIES AND PUBLIC
NOTICE
List additional consulting parties that were invited to participate by the Applicant, or
independently requested to participate. Provide any relevant correspondence or other
documents.
On September 22, 2025, the Sumter County Genealogical Society was notified of the proposed
project. They were i nvited to comment on the proposed project’s potential effect on Historic
Properties and to indicate whether they are interested in consulting further on the proposed
proj
ect. A copy of Trileaf’s correspondence with the Sumter County Genealogical Society is
attached. As of this date, no response has been received from the S umter County Genealogical
Society. Should a response be received, a copy will be forwarded to all consulting parties as an
adde
ndum to this packet.
You are required t o p rovide a Public Notice Attachment.
Attached, please find a copy of a legal notice regarding the proposed telecommunications tower
construction that was posted in the Item on September 25, 2025. No responses have yet been
recived. Should a response be received, copies will be forwarded to all consulting parties as an
addendum to this submission packet.
1775 The Exchange SE, Suite 525, Atlanta, GA 30339 - 678-653-8673 - www.trileaf.com
September 22, 2025
Sumte
r County Genealogical Society
122 N Washington St.
Sumter, South Carolina 29150
Phone: (803) 774-3901
Email:genealogy@ftc-i.net
RE: Har
moni Towers LLC – Borden – Client #SC0009812 – Trileaf Project #772867
Camden Highway, Rembert, South Carolina 29128
Sumter County, Rembert Quadrangle (USGS)
Latitude: 34° 4’ 2.5869” N, Longitude: 80° 30’ 34.8467” W
To Whom It May Concern,
Tri
leaf Corporation is in the process of completing a NEPA Review at the referenced property. Our client proposes
to construct a 279- foot Self-Support Communications Tower, with an overall height of 283 feet and associated
equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot (5,625-square-foot) lease area. The
project includes a 12-foot-wide gravel drive within an access/utility easement, measuring 30 feet wide, extending
approximately 20 feet generally northeast away from the lease area towards Camden Highway. The proposed
access/utility easement and tower compound lease area are located with an agricultural field. The antenna will be
licensed by the Federal Communications Commission (FCC).
Our
investigation includes determining if the site is contained in, on or within the viewshed of a building, site,
district, structure or object, significant in American history, architecture, archaeology, engineering or culture, that
is listed, or eligible for listing on the State or National Registers of Historic Places, or located in or on an Indian
Religious Site.
Tri
leaf is requesting information regarding this tower’s potential effect on Historic Properties. All information
received will be forwarded to the State Historic Preservation Office (SHPO) as part of the Section 106 review
process. Additionally, this invitation to comment is separate from any local planning/zoning process that may
apply to this project.
If
you wish to comment or be considered a consulting party, please respond within thirty (30) days of the date of
this letter. If a response is not received within thirty (30) days, it will be assumed that you have no objections to
this undertaking. A site topography map and aerial photograph are enclosed for your reference.
Pleas
e call me at (706) 362-1745 or email h.dell@trileaf.com if you need additional information or have any
questions. Thank you for your assistance in this regard.
Sin
cerely,
Hann
ah Dell
Assistant Project Manager
UmterlTEM Publisheddailyby Osteen PublishingCo., Inc.
Sumter,sc 29151. (803)774-1200
STATE OF SOUTH CAROLINA
COUNTY OF SUMTER
PRINTER AFFIDAVIT
INKLYNK. LLC
2300 BETHELVIEW RD # 110-302
Harmeni Towers LLC
build
0
self-support
communications tower attheapprox.
vicinity of Camden
a 283-foot
Persoiia^y^PRearedbeforeme
hjjầة
[Laf: 34-4-2.5869, Long:ج
regardingpotentialeffectsfrom this
siteon historicpropertiesmay be
submittedwithin 39 days from"the
date of thispublicationto:TrilCar
Coip, Hannah Dell, h.dell
Ctrlleaf.com,1775 The Exchan'ge
SĘ, Suite 525,Atlanta,GA 30339,1745
TheSumterItem,%UàClerk
Who being duly sworn,says sticisa
Bookkeeping clerkof theOSTEEN
PUBLISHING CO., PublisherofTHE ITEM
A Newspaper publisliedinsaidstateand
county and tlicadvcrtisctiicnt
comments
Sort Text; Harmoni Towers, LLC
Ad Order ID; 362810
was publisliedinsaidnewspaper on
09/24/2025
and a copy oftheadvertisementisattached.
Swo
ااا-ا٩
Nota^ Public-StateofSouthCarolina
My Commission Expires
31,2026May
ATTACHMENT 11. SHPO SPECIFIC FORMS
N/A
1
Hannah Dell
From: towernotifyinfo@fcc.gov
Sent: Sunday, December 28, 2025 11:46 PM
To: Hannah Dell
Subject: Section 106 Notification of SHPO/THPO Concurrence- Email ID #11966099
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
This is to notify you that the Lead SHPO/THPO has concurred with the following filing:
Date of Action: 12/28/2025
Direct Effect: No Historic Properties in Area of Potential Effects (APE)
Visual Effect: No Historic Properties in Area of Potential Effects (APE)
Comment Text: None
File Number: 0011798220
TCNS Number: 301523
Purpose: New Tower Submission Packet
Notification Date: 7AM EST 11/28/2025
Applicant: Harmoni Towers, LLC
Consultant: Acheulean Consulting on behalf of Trileaf Corporation
Positive Train Control Filing Subject to Expedited Treatment Under Program Comment: No
Site Name: Borden
Site Address: Camden Highway
Detailed Description of Project: Harmoni Towers LLC proposes to construct a 279-foot Self-Support
Communications Tower, with an overall height of 283 feet and associated equipment within a 75-foot by
75-foot (5,625-square-foot) lease area.
Site Coordinates: 34-4-2.6 N, 80-30-34.8 W
City: Rembert
County: SUMTER
State:SC
Lead SHPO/THPO: Department of Archives and History
NOTICE OF FRAUDULENT USE OF SYSTEM, ABUSE OF PASSWORD AND RELATED MISUSE
Use of the Section 106 system is intended to facilitate consultation under Section 106 of the National
Historic Preservation Act and may contain information that is confidential, privileged or otherwise
protected from disclosure under applicable laws. Any person having access to Section 106 information
shall use it only for its intended purpose. Appropriate action will be taken with respect to any misuse of
the system.
1
Hannah Dell
From: towernotifyinfo@fcc.gov
Sent: Wednesday, November 26, 2025 10:17 AM
To: Hannah Dell
Subject: Section 106 New Filing Submitted- Email ID #11823393
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
The following new Section 106 filing has been submitted:
File Number: 0011798220
TCNS Number: 301523
Purpose: New Tower Submission Packet
Notification Date: 7AM EST 11/28/2025
Applicant: Harmoni Towers, LLC
Consultant: Acheulean Consulting on behalf of Trileaf Corporation
Positive Train Control Filing Subject to Expedited Treatment Under Program Comment: No
Site Name: Borden
Site Address: Camden Highway
Detailed Description of Project: Harmoni Towers LLC proposes to construct a 279-foot Self-Support
Communications Tower, with an overall height of 283 feet and associated equipment within a 75-foot by
75-foot (5,625-square-foot) lease area.
Site Coordinates: 34-4-2.6 N, 80-30-34.8 W
City: Rembert
County: SUMTER
State:SC
Lead SHPO/THPO: Department of Archives and History
Consultant Contact Information:
Name: Acheulean Consulting on behalf of Trileaf Corporation
Title:
PO Box:
Address: 1503 Cypress Street
City: Paris
State: KY
Zip: 40361
Phone: 678-653-8673
Fax:
Email: h.dell@trileaf.com
NOTICE OF FRAUDULENT USE OF SYSTEM, ABUSE OF PASSWORD AND RELATED MISUSE
Use of the Section 106 system is intended to facilitate consultation under Section 106 of the National
Historic Preservation Act and may contain information that is confidential, privileged or otherwise
2
protected from disclosure under applicable laws. Any person having access to Section 106 information
shall use it only for its intended purpose. Appropriate action will be taken with respect to any misuse of
the system.
Appendix F
Native American Correspondence
Date Requested
Information Date Sent Date Comments
Catawba Indian Nation 12/2/2025 Sent Letter & Form
620/621 12/30/2025
No immediate concerns with regard to
traditional cultural properties, sacred
sites or Native American archeological
sites within the boundaries of the
proposed project areas - Requests
inadvertent discovery notification.
Cherokee Nation 12/2/2025 Sent Letter & Form
620/621 1/8/2026
the Nation does not object to the project
proceeding as long as the
following mitigative procedures are
followed:
• The Nation requests that Trileaf
re‐contact this Office if there are any
amendments or edits to this project; and
• The Nation requests that Trileaf
contact this Office if there are any
pre‐contact or post‐contact artifacts
located
throughout the course of this project.
Examples of pre‐contact artifacts may
include but are not limited to
arrowheads,
stone‐ground tools, mortars, pestles,
pottery shards, or fire pits. Post‐contact
artifacts may include but are not limited
to
cellars, cabins, or ceramic vessels.
If the above procedures are observed,
the Nation does not object to this
project proceeding. - Requests scope
change & inadvertent discovery
notification.
Eastern Shawnee Tribe
of Oklahoma
30 days no interest
Notify of inadvertent discovery 9/18/2025
We have no interest in this site. -
Requests inadvertent discovery
notification.
Prairie Island Indian
Community
30 days no interest
Notify of inadvertent discovery 12/2/2025 Sent Letter & Form
620/621 1/1/2026 Cleared per NOO
Thlopthlocco Tribal
Town 12/2/2025 Sent Letter & Form
620/621
1/23/2026 Cleared by Referral 1/8/2026
Tuscarora Nation 30 days no interest
Notify of inadvertent discovery 12/2/2025 Sent Letter & Form
620/621 1/1/2026 Cleared per NOO
September 19, 2025FCC Start:
FCC
Referral
Standing
Agreements &
Comments
Tribal Summary Table
Tribe TCNS auto-reply
Follow Up Request from Tribe Follow Up(s) to Tribe Final Reply
Site: Borden
TCNS Number: 301523
Site ID: SC0009812
Page 1 of 1
1
Michael Romanoski
From: towernotifyinfo@fcc.gov
Sent: Friday, September 19, 2025 2:02 AM
To: Tribal
Cc: tcnsweekly@fcc.gov
Subject: NOTICE OF ORGANIZATION(S) WHICH WERE SENT PROPOSED TOWER CONSTRUCTION
NOTIFICATION INFORMATION - Email ID #9325921
Categories: Mike
CAUTION: This email originated from outside of the organiza. on. Do not click links or open aƩachments unless you
recognize the sender and know the content is safe.
Dear Applicant:
Thank you for using the Federal CommunicaƟons Commission's (FCC) Tower ConstrucƟon NoƟficaƟon System
(TCNS). The purpose of this electronic mail message is to inform you that the following authorized persons were sent the
noƟficaƟon that you provided through TCNS, which relates to your proposed antenna structure. The informaƟon was
forwarded by the FCC to authorized TCNS users by electronic mail and/or regular mail (leƩer). We note that the review
period for all parƟes begins upon receipt of the Submission Packet pursuant to SecƟon VII.A of the NPA and noƟficaƟons
that do not provide this serve as informaƟon only.
Persons who have received the noƟficaƟon that you provided include leaders or their designees of federally-
recognized American Indian Tribes, including Alaska NaƟve Villages (collecƟvely "Tribal NaƟons"), NaƟve Hawaiian
OrganizaƟons (NHOs), and State Historic PreservaƟon Officers (SHPOs). For your convenience in idenƟfying the
referenced Tribal NaƟons and NHOs and in making further contacts, the City and State of the Seat of Government for
each Tribal NaƟon and NHO, as well as the designated contact person, is included in the lisƟng below. We note that
Tribal NaƟons may have SecƟon 106 cultural interests in ancestral homelands or other locaƟons that are far removed
from their current Seat of Government. Pursuant to the Commission's rules as set forth in the NaƟonwide ProgrammaƟc
Agreement for Review of Effects on Historic ProperƟes for Certain Undertakings Approved by the Federal
CommunicaƟons Commission (NPA), all Tribal NaƟons and NHOs listed below must be afforded a reasonable opportunity
to respond to this noƟficaƟon, consistent with the procedures set forth below, unless the proposed construcƟ
on falls
within an exclusion designated by the Tribal NaƟon or NHO. (NPA, SecƟon IV.F.4).
The noƟficaƟon that you provided was forwarded to the following Tribal NaƟons and NHOs. A Tribal NaƟon or
NHO may not respond unƟl a full Submission Packet is provided. If, upon receipt, the Tribal NaƟon or NHO does not
respond within a reasonable Ɵme, you should make a reasonable effort at follow-up contact, unless the Tribal NaƟon or
NHO has agreed to different procedures (NPA, SecƟon IV.F.5). In the event a Tribal NaƟon or NHO does not respond to a
follow-up inquiry, or if a substanƟve or procedural disagreement arises between you and a Tribal NaƟon or NHO, you
must seek guidance from the Commission (NPA, SecƟon IV.G). These procedures are further set forth in the FCC's Second
Report and Order released on March 30, 2018 (FCC 18-30).
1. TCNS Rep Bryan Printup - Tuscarora NaƟon - 5226 Walmore Rd Via: Lewiston, NY - bprintup@heƞ.org - 716-264-
6011 (ext: 103) - electronic mail
2
If the applicant/tower builder receives no response from the Tuscarora NaƟon within 30 days aŌer noƟficaƟon
through TCNS, the Tuscarora NaƟon has no interest in parƟcipaƟng in pre-construcƟon review for the proposed site. The
Applicant/tower builder,
however, must immediately noƟfy the Tuscarora NaƟon in the event archaeological properƟes or human remains
are discovered during construcƟon, consistent with SecƟon IX of the NaƟonwide ProgrammaƟc Agreement and
applicable law.
2. THPO Noah C White III - Prairie Island Indian Community - 5636 Sturgeon Lake Road Welch, MN -
celltower@piic.org - 651-385-4175 - electronic mail
If the applicant/tower builder receives no response from the Prairie Island Indian Community within 30 days aŌer
noƟficaƟon through TCNS, the Prairie Island Indian Community has no interest in parƟcipaƟng in pre-construcƟon review
for the proposed site. The Applicant/tower builder,
however, must immediately noƟfy the Prairie Island Indian Community in the event archaeological properƟes or
human remains are discovered during construcƟon, consistent with SecƟon IX of the NaƟonwide ProgrammaƟc
Agreement and applicable law.
3. Gwen Terrapin - Cherokee NaƟon - (PO Box: 948) Tahlequah, OK - historicpreservaƟon@cherokee.org; gwen-
terrapin@cherokee.org - 918-772-4165 - electronic mail
Exclusions: Please email all review documents for FCC Form 620/621 (i.e. archeologist report, photos, SHPO response,
etc.) to historicpreservaƟon@cherokee.org or gwen-terrapin@cherokee.org. You may also mail a cover leƩer and a CD
or flash drive containing the review documents and FCC forms to: Cherokee NaƟon: AƩn: Gwen Terrapin, PO Box 948,
Tahlequah, OK 74465. Should you have any quesƟons, please do not hesitate to email or call 918.772.4165.
Wado,
Cherokee NaƟon
4. Director Lora Nuckolls - Eastern Shawnee Tribe of Oklahoma - 70400 East HWY 60 WyandoƩe, OK -
celltower@estoo.net - 918-238-5151 (ext: 1840) - regular mail
Exclusions: Submit one printed color copy by US postal mail or other parcel carrier of all documentaƟon to:
Eastern Shawnee Tribe
AƩn: Cell Tower Program
70500 E. 128 Rd.
WyandoƩe, OK 74370
Provide a 1-page cover leƩer with the following informaƟon:
a. TCNS Number
b. Company Name
c. Project Name, City, County, State
d. Project type
3
e. Project coordinates
f. Contact informaƟon
The Eastern Shawnee Procedures document is available and highly recommended for guidance; send an email to
celltower@estoo.net requesƟng our most current copy.
If the applicant/tower builder receives no response from the Eastern Shawnee Tribe of Oklahoma within 30 days
aŌer noƟficaƟon through TCNS, the Eastern Shawnee Tribe of Oklahoma has no interest in parƟcipaƟng in pre-
construcƟon review for the proposed site. The Applicant/tower builder,
however, must immediately noƟfy the Eastern Shawnee Tribe of Oklahoma in the event archaeological properƟes or
human remains are discovered during construcƟon, consistent with SecƟon IX of the NaƟonwide ProgrammaƟc
Agreement and applicable law.
5. Mekko Ryan Morrow - Thlopthlocco Tribal Town - P .O. Box 188 Okemah, OK - thpo@Ʃtown.org - 000-000-0000 -
electronic mail
Exclusions: Thlopthlocco Tribal Town requests that all iniƟal review materials required by applicable law be submiƩed by
email directly to thpo@Ʃtown.org. In addiƟon, in the event archeological or cultural materials or human remains are
discovered at any Ɵme during this undertaking, please noƟfy Thlopthlocco Tribal Town immediately.
6. THPO and ExecuƟve Director Dr. Wenonah G Haire DMD - Catawba Indian NaƟon - 1536 Tom Steven Road
Catawba Cultural Center Rock Hill, SC - Wenonah.Haire@catawba.com; Caitlin.Rogers@catawba.com - 803-417-9057 -
regular mail
Exclusions: Please do not email documentaƟon; it will be deleted without being opened. Mail one printed color copy of
all documentaƟon to address:
Dr. Wenonah G. Haire
Tribal Historic PreservaƟon Office
1536 Tom Steven Road
Rock Hill, SC 29730
Please submit by US Postal mail or other parcel carrier complete informaƟon for all telecommunicaƟon projects:
1. Please provide 1 page cover leƩer with following informaƟon
a. TCNS Number
b. Company Name
c. Project Name, City, County, State
d. Project Type
e. Project coordinates
f. Contact informaƟon
2. We also request photographs of project area, previous land use history and copy of SHPO LeƩer.
If yo
u have any quesƟons about our process or Ɵmeline of project noƟficaƟons you can email Caitlin Rogers at
Caitlinh@ccppcraŌs.com
4
The noƟficaƟon that you provided was also forwarded to the following SHPOs in the State in which you propose
to construct and neighboring States. The informaƟon was provided to these SHPOs as a courtesy for their informaƟon
and planning. You need make no effort at this Ɵme to follow up with any SHPO that does not respond to this
noƟficaƟon. Prior to construcƟon, you must provide the SHPO of the State in which you propose to construct (or the
Tribal Historic PreservaƟon Officer, if the project will be located on certain Tribal lands), with a Submission Packet
pursuant to SecƟon VII.A of the NPA unless the project is excluded from SHPO review under SecƟon III D or E of the NPA.
7. Environmental Review Coordinator Renee GledhillEarley - NC State Historic PreservaƟon Office - 4617 Mail Service
Center Raleigh, NC - renee.gledhill-earley@ncmail.net - 919-733-4763 - electronic mail
8. Deputy SHPO David Brook - Historic PreservaƟon Office - 4610 Mail Service Center Raleigh, NC -
david.brook@ncmail.net - 919-807-7283 - electronic mail
9. Project Review Coordinator John Sylvest - Department of Archives and History - 8301 Parklane Road Columbia, SC
- jsylvest@scdah.sc.gov - 803-896-6129 - electronic mail
TCNS automaƟcally forwards all noƟficaƟons to all Tribal NaƟons and SHPOs that have an expressed interest in
the geographic area of a proposal. However, if a proposal for PTC wayside poles falls within a designated exclusion, you
need not expect any response and need not pursue any addiƟonal process with that Tribal NaƟon or SHPO. In addiƟon, a
parƟcular Tribal NaƟon or SHPO may also set forth policies or procedures within its details box that exclude from review
certain faciliƟes (for example, a statement that it does not review collocaƟons with no ground disturbance; or that
indicates that no response within 30 days indicates no interest in parƟcipaƟng in pre-construcƟon review).
Please be advised that the FCC cannot guarantee that the contact(s) listed above have opened and reviewed an
electronic or regular mail noƟficaƟon. If you learn that any of the above contact informaƟon
is no longer valid, please
contact the FCC by emailing tcnshelp@fcc.gov. The following informaƟon relaƟng to the proposed tower was forwarded
to the person(s) listed above:
NoƟficaƟon Received: 09/16/2025
NoƟficaƟon ID: 301523
Excluded from SHPO Review: No
Tower Owner Individual or EnƟty Name: Harmoni Towers, LLC
Consultant Name: Michael Romanoski
Street Address: 1515 Des Peres Rd. Ste 200
Suite 200
City: St. Louis
State: MISSOURI
Zip Code: 63131
Phone: 314-997-6111
5
Email: tribal@trileaf.com
Structure Type: LTOWER - Laƫce Tower
LaƟtude: 34 deg 4 min 2.6 sec N
Longitude: 80 deg 30 min 34.8 sec W
LocaƟon DescripƟon: Camden Highway
City: Rembert
State: SOUTH CAROLINA
County: SUMTER
Detailed DescripƟon of Project: Harmoni Towers LLC proposes to construct a 279-foot Self-Support CommunicaƟons
Tower, with an overall height of 283 feet and associated equipment within a 75-foot by 75-foot (5,625-square-foot) lease
area.
Ground ElevaƟon: 73.7 meters
Support Structure: 85.0 meters above ground level
Overall Structure: 86.3 meters above ground level
Overall Height AMSL: 160.0 meters above mean sea level
If you have any quesƟons or comments regarding this noƟce, please contact the FCC using the electronic Help Request
form located on the FCC's website at:
hƩps://urldefense.proofpoint.com/v2/url?u=hƩps-3A__www.fcc.gov_wireless_available-2Dsupport-
2Dservices&d=DwIFaQ&c=euGZstcaTDllvimEN8b7jXrwqOf-
v5A_CdpgnVfiiMM&r=tVy9dfE6fJUkHc15_Itk39MNoGtgWe1vmeedh3_FbFk&m=xuiZwBxPrrSZc80Qlv-s_t4MZ3-
4W43LAQuZILpwSmamvP77ioLuOxWQSxov-Grt&s=7pP426Lnov_hso07F0PYDL9dZUmZSUhpCoajHchF3q4&e=
You may also call the FCC Support Center at (877) 480-3201 (TTY 717-338-2824). Hours are from 8:00 a.m. to
6:00 p.m. Eastern Time, Monday through Friday (except Federal holidays). To provide quality service and ensure security,
all telephone calls are recorded.
Thank you,
Federal CommunicaƟons Commission
----------
This email has been scanned for spam and viruses by Proofpoint EssenƟals. Visit the following link to report this email as
spam:
hƩps://us1.proofpointessenƟals.com/app/report_spam.php?mod_id=11&mod_opƟon=logitem&report=1&type=easysp
am&k=k1&payload=53616c7465645f5f7c8c95c304975a1603a9de986fdea90adf0ĩcd871dad7a98ec00c339035a5c34f7a
76df77222347df7c3465237ab8fc46265ce14133d361f6cce50718162a0ea8c679559ccbc6ddf26aa1ed0f691d0e004979ce4
2de0733c4257e4c4cf71474817c8e1f4a74eddd5f580a008ac18bddd5d39f3afc95777642632cd41a6f10039b6f4b5b7aa31
62e312a8e8b3c100c584719b434eced4789
December 2, 2025
Catawba Indian Nation
Dr. Wenonah G. Haire
1536 Tom Steven Road
Tribal Historic Preservation Office
Rock Hill, SC 29730
RE: Harmoni Towers LLC
Trileaf Project # 772867 / SC0009812 / Borden
Camden Highway, Rembert, Sumter County, SC 29128
Latitude: 34° 4’ 2.59” N, Longitude: 80° 30’ 34.85” W
TCNS # 301523
Dear Dr. Haire:
This project was originally submitted in TCNS on 9/19/2025. Trileaf Corporation is in the process of
completing a NEPA Review at the above referenced property. Our investigation includes determining if
the site is contained in, on, or within the viewshed of a building, site, district, structure or object, significant
in American history, architecture, archeology, engineering or culture, that is listed or eligible for listing on
the State or National Registers of Historic Places, or located in or on, or within the viewshed of an Indian
Religious Site. Trileaf has learned your tribe has an interest in property located within this County.
Our client proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of
283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot
(5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility
easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease
area towards Camden Highway. The proposed access/utility easement and tower compound lease area are
located with an agricultural field.
The form 620/621 submission packet is attached for your review. Please let us know if you have any
objections or comments on this project as soon as possible. Contact me at (314) 997-6111 or email
tribal@trileaf.com if you have any questions. Thank you for your assistance in this regard.
Sincerely,
Michael Romanoski
Tribal Consultation Manager
1515 Des Peres Road, Suite 200, Saint Louis, Missouri 63131 - 314.997.6111 www.trileaf.com
December 30, 2025
Attention: Michael Romanoski
Trileaf
1515 Des Peres Road, Suite 200
Saint Louis, Missouri 63131
Re. THPO # TCNS # Project Description
2026-160-24 301523 Camden Highway, Rembert, Sumter Co., SC
Dear Mr. Romanoski,
The Catawba have no immediate concerns with regard to traditional cultural properties,
sacred sites or Native American archaeological sites within the boundaries of the
proposed project areas. However, the Catawba are to be notified if Native American
artifacts and / or human remains are located during the ground disturbance phase
of this project.
If you have questions, please contact Caitlin Rogers at 803-328-2427 ext. 226, or e-mail
Caitlin.Rogers@catawba.com.
Sincerely,
Wenonah G. Haire
Tribal Historic Preservation Officer
Catawba Indian Nation
Tribal Historic Preservation Office
1536 Tom Steven Road
Rock Hill, South Carolina 29730
Office 803-328-2427
December 2, 2025
Cherokee Nation
Ms. Gwen Terrapin
P.O. Box 948
Tahlequah, OK 74465
RE: Harmoni Towers LLC
Trileaf Project # 772867 / SC0009812 / Borden
Camden Highway, Rembert, Sumter County, SC 29128
Latitude: 34° 4’ 2.59” N, Longitude: 80° 30’ 34.85” W
TCNS # 301523
Dear Ms. Terrapin:
This project was originally submitted in TCNS on 9/19/2025. Trileaf Corporation is in the process of
completing a NEPA Review at the above referenced property. Our investigation includes determining if
the site is contained in, on, or within the viewshed of a building, site, district, structure or object, significant
in American history, architecture, archeology, engineering or culture, that is listed or eligible for listing on
the State or National Registers of Historic Places, or located in or on, or within the viewshed of an Indian
Religious Site. Trileaf has learned your tribe has an interest in property located within this County.
Our client proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of
283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot
(5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility
easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease
area towards Camden Highway. The proposed access/utility easement and tower compound lease area are
located with an agricultural field.
The form 620/621 submission packet is attached for your review. Please let us know if you have any
objections or comments on this project as soon as possible. Contact me at (314) 997-6111 or email
tribal@trileaf.com if you have any questions. Thank you for your assistance in this regard.
Sincerely,
Michael Romanoski
Tribal Consultation Manager
1515 Des Peres Road, Suite 200, Saint Louis, Missouri 63131 - 314.997.6111 www.trileaf.com
1
From: towernotifyinfo@fcc.gov
Sent: Thursday, January 8, 2026 12:22 PM
To: Tribal
Cc: tcns.fccarchive@fcc.gov; historicpreservation@cherokee.org; gwen-terrapin@cherokee.org
Subject: Reply to Proposed Tower Structure (Notification ID: 301523) - Email ID #9410656
Categories:
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
Dear Michael Romanoski,
Thank you for using the Federal Communications Commission's (FCC) Tower Construction Notification System (TCNS).
The purpose of this email is to inform you that an authorized user of the TCNS has replied to a proposed tower
construction notification that you had submitted through the TCNS.
The following message has been sent to you from Gwen Terrapin of the Cherokee Nation in reference to Notification ID
#301523:
The Cherokee Nation (Nation) is in receipt of your correspondence for tower project, TCNS No. 301523 located in
Sumter County, SC and appreciates the opportunity to provide comments upon this project.
The National Historic Preservation Act (NHPA, 54 U.S.C. § 300101 et seq), and its implementing regulations (36 CFR part
800), provide that undertakings subject to the Section 106 review process are referred to in 54 U.S.C. § 306108, which
clarifies that historic properties may have religious and cultural significance to Indian tribes.
The Nation maintains proprietary databases and records of cultural, pre‐contact, and post‐contact archeological
resources in this area. Upon completion of our Section 106 review the Nation’s Historic Preservation Office researched
and cross‐referenced the project’s legal description against our information and found instances where this project
intersects or adjoins such resources. However, the Nation does not object to the project proceeding as long as the
following mitigative procedures are followed:
• The Nation requests that Trileaf re‐contact this Office if there are any amendments or edits to this project; and
• The Nation requests that Trileaf contact this Office if there are any pre‐contact or post‐contact artifacts located
throughout the course of this project. Examples of pre‐contact artifacts may include but are not limited to arrowheads,
stone‐ground tools, mortars, pestles, pottery shards, or fire pits. Post‐contact artifacts may include but are not limited to
cellars, cabins, or ceramic vessels.
If the above procedures are observed, the Nation does not object to this project proceeding.
Additionally, due to the historic presence of our people in the project area, inadvertent discoveries of human remains
and related NAGPRA items may occur, even in areas of existing or prior development. Should this occur, we request all
2
work cease and Cherokee Nation be notified immediately at (918) 931‐7161. In such discovery, other appropriate
agencies will need to be contacted immediately as well.
Should you have any further questions, please do not hesitate to call.
Wado,
Cherokee Nation
For your convenience, the information you submitted for this notification is deta
iled below.
Notification Received: 09/16/2025
Notification ID: 301523
Tower Owner Individual or Entity Name: Harmoni Towers, LLC
Consultant Name: Michael Romanoski
Street Address: 1515 Des Peres Rd. Ste 200
Suite 200
City: St. Louis
State: MISSOURI
Zip Code: 63131
Phone: 314‐997‐6111
Email: tribal@trileaf.com
Structure Type: LTOWER ‐ Lattice Tower
Latitude: 34 deg 4 min 2.6 sec N
Longitude: 80 deg 30 min 34.8 sec W
Location Description: Camden Highway
City: Rembert
State: SOUTH CAROLINA
County: SUMTER
Detailed Description of Project: Harmoni Towers LLC proposes to construct a 279‐ foot Self‐Support Communications
Tower, with an overall height of 283 feet and associated equipment within a 75‐foot by 75‐foot (5,625‐square‐foot)
lease area.
Ground Elevation: 73.7 meters
Support Structure: 85.0 meters above ground level
Overall Structure: 86.3 meters above ground level
Overall Height AMSL: 160.0 me ters above mean sea level
‐‐‐‐‐‐‐‐‐‐
This email has been scanned for spam and viruses by Proofpoint Essentials. Visit the following link to report this email as
spam:
https://us1.proofpointessentials.com/app/report_spam.php?mod_id=11&mod_option=logitem&report=1&type=easysp
am&k=k1&payload=53616c7465645f5f8e5de8511ef4e97fec5f597c5e1088806b981ef19935cfb53b70fd7864f3e582bf090
096c1fdd034d1a420e22460321b98df4a03d62fd4d59bcad9f7a700d95be9f40814ae4ec427f922d486a7ad306bc2b8b06e
603f9fcde132b06712a1b6cc8842fcece960ad23880120f4354b6f5236e6308dbe3e22de00c7b726e4f8249b9fdca32f791f9
1ce38019715d2f0d7812b466537f334b857
December 2, 2025
Trileaf
Attn: Michael Romanoski
VIA: Email: tribal@trileaf.com
Re: TCNS 301523
The Cherokee Nation (Nation) is in receipt of your correspondence about TCNS 301523 and
appreciates the opportunity to provide comment upon this proposed facility deployment.
The Nation possesses, maintains, and updates databases and records of cultural, pre-contact, and
post-contact historic and archeological resources in this area that are unique to the Nation and the
removed Cherokees. In order to ensure that your project review is accurate and complete, the
Nation can cross -reference your project and its associated activities against these databases and
records. The Nation can provide this review and submit the documentation necessary for your
project to move forward without delay.
Please contact the Nation directly at the information provided below this letter to discuss this
compensable service. If you require additional information or have any questions, please contact
me at your convenience. Thank you for your time and attention to this matter.
Wado,
Elizabeth Toombs, Tribal Historic Preservation Officer
Cherokee Nation Tribal Historic Preservation Office
elizabeth-toombs@cherokee.org
918.453.5389
1
Michael Romanoski
From: towernotifyinfo@fcc.gov
Sent: Thursday, September 18, 2025 8:39 AM
To: Tribal
Cc: tcns.fccarchive@fcc.gov; celltower@estoo.net
Subject: Reply to Proposed Tower Structure (Notification ID: 301523) - Email ID #9329251
Categories: Mike, Responses to File
CAUTION: This email originated from outside of the organizaƟon. Do not click links or open aƩachments unless you
recognize the sender and know the content is safe.
Dear Michael Romanoski,
Thank you for using the Federal CommunicaƟons Commission's (FCC) Tower ConstrucƟon NoƟficaı on System (TCNS).
The purpose of this email is to inform you that an authorized user of the TCNS has replied to a proposed tower
construcı on noƟficaı on that you had submiı ed through the TCNS.
The following message has been sent to you from Director Lora Nuckolls of the Eastern Shawnee Tribe of Oklahoma in
reference to Noı ficaı on ID #301523:
We have no interest in this site. However, if the Applicant discovers archaeological remains or resources during
construcı on, the Applicant should immediately stop construcı on and noı fy the appropriate Federal Agency and the
Tribe.
For your convenience, the informaı on you submiı ed for this noı ficaı on is detailed below.
NoƟficaı on Received: 09/16/2025
Noı ficaı on ID: 301523
Tower Owner Individual or Enı ty Name: Harmoni Towers, LLC
Consultant Name: Michael Romanoski
Street Address: 1515 Des Peres Rd. Ste 200
Suite 200
City: St. Louis
State: MISSOURI
Zip Code: 63131
Phone: 314-997-6111
Email: tribal@trileaf.com
Structure Type: LTOWER - Laı ce Tower
Laı tude: 34 deg 4 min 2.6 sec N
Longitude: 80 deg 30 min 34.8 sec W
2
LocaƟon DescripƟon: Camden Highway
City: Rembert
State: SOUTH CAROLINA
County: SUMTER
Detailed DescripƟon of Project: Harmoni Towers LLC proposes to construct a 279-foot Self-Support CommunicaƟons
Tower, with an overall height of 283 feet and associated equipment within a 75-foot by 75-foot (5,625-square-foot) lease
area.
Ground ElevaƟon: 73.7 meters
Support Structure: 85.0 meters above ground level
Overall Structure: 86.3 meters above ground level
Overall Height AMSL: 160.0 meters above mean sea level
----------
This email has been scanned for spam and viruses by Proofpoint EssenƟals. Visit the following link to report this email as
spam:
hƩps://us1.proofpointessenƟals.com/app/report_spam.php?mod_id=11&mod_opƟon=logitem&report=1&type=easysp
am&k=k1&payload=53616c7465645f5f450c6c336ecd4ae4c992e119abdf603b8bc39f1d8888a535d42da883e6995b10586
fa9b421a56c4f6e89f08982439d6888e63fd0559f9a4cebf9543d98aa6edd6ad446ccc728a5c3dac4dc755c6180cb470e96f0
e48a5bce67ae1413139023f0b7973cfdb76a8f5be0b53b210856adbcĩd0d9df5f3a12e2a2950a0d84056b67f486438d47d4
bcb6cad58a23aaf0cc40c8e0db3d81516944
December 2, 2025
Prairie Island Indian Community
Mr. Noah White III
5636 Sturgeon Lake Road
Welch, MN 55089
RE: Harmoni Towers LLC
Trileaf Project # 772867 / SC0009812 / Borden
Camden Highway, Rembert, Sumter County, SC 29128
Latitude: 34° 4’ 2.59” N, Longitude: 80° 30’ 34.85” W
TCNS # 301523
Dear Mr. White III:
This project was originally submitted in TCNS on 9/19/2025. Trileaf Corporation is in the process of
completing a NEPA Review at the above referenced property. Our investigation includes determining if
the site is contained in, on, or within the viewshed of a building, site, district, structure or object, significant
in American history, architecture, archeology, engineering or culture, that is listed or eligible for listing on
the State or National Registers of Historic Places, or located in or on, or within the viewshed of an Indian
Religious Site. Trileaf has learned your tribe has an interest in property located within this County.
Our client proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of
283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot
(5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility
easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease
area towards Camden Highway. The proposed access/utility easement and tower compound lease area are
located with an agricultural field.
The form 620/621 submission packet is attached for your review. Please let us know if you have any
objections or comments on this project as soon as possible. Contact me at (314) 997-6111 or email
tribal@trileaf.com if you have any questions. Thank you for your assistance in this regard.
Sincerely,
Michael Romanoski
Tribal Consultation Manager
1515 Des Peres Road, Suite 200, Saint Louis, Missouri 63131 - 314.997.6111 www.trileaf.com
December 2, 2025
Thlopthlocco Tribal Town
Mekko Ryan Morrow
P.O. Box 188
Okemah, OK 74859
RE: Harmoni Towers LLC
Trileaf Project # 772867 / SC0009812 / Borden
Camden Highway, Rembert, Sumter County, SC 29128
Latitude: 34° 4’ 2.59” N, Longitude: 80° 30’ 34.85” W
TCNS # 301523
Dear Mekko Morrow:
This project was originally submitted in TCNS on 9/19/2025. Trileaf Corporation is in the process of
completing a NEPA Review at the above referenced property. Our investigation includes determining if
the site is contained in, on, or within the viewshed of a building, site, district, structure or object, significant
in American history, architecture, archeology, engineering or culture, that is listed or eligible for listing on
the State or National Registers of Historic Places, or located in or on, or within the viewshed of an Indian
Religious Site. Trileaf has learned your tribe has an interest in property located within this County.
Our client proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of
283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot
(5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility
easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease
area towards Camden Highway. The proposed access/utility easement and tower compound lease area are
located with an agricultural field.
The form 620/621 submission packet is attached for your review. Please let us know if you have any
objections or comments on this project as soon as possible. Contact me at (314) 997-6111 or email
tribal@trileaf.com if you have any questions. Thank you for your assistance in this regard.
Sincerely,
Michael Romanoski
Tribal Consultation Manager
1515 Des Peres Road, Suite 200, Saint Louis, Missouri 63131 - 314.997.6111 www.trileaf.com
1
Lee Castile
From: towernotifyinfo@fcc.gov
Sent: Thursday, January 8, 2026 8:03 AM
To: Tribal
Cc: tcnsweekly@fcc.gov
Subject: Proposed Construction of Communications Facilities Notification of Final Contacts - Email ID #39087
CAUTION: This email originated from outside of the organiza. on. Do not click links or open aƩachments unless you
recognize the sender and know the content is safe.
Michael Romanoski
1515 Des Peres Rd. Ste 200
Suite 200
St. Louis, MO 63131
Dear Applicant:
This leƩer addresses the proposed communicaƟons faciliƟes listed below that you have referred to the Federal
CommunicaƟons Commission (Commission) for purposes of contacƟng federally recognized Indian Tribes, including
Alaska NaƟve Villages (collecƟvely Indian Tribes), and NaƟve Hawaiian OrganizaƟons (NHOs), as specified by SecƟon IV.G
of the NaƟonwide ProgrammaƟc Agreement (NPA). Consistent with the procedures outlined in the Commission's
Wireless Infrastructure Second Report and Order (1), we have contacted the Indian Tribes or NHOs idenƟfied in the
aƩached Table for the projects listed in the aƩached Table. You referred these projects to us between 01/01/2026 and
01/08/2026. Our contact with these Tribal NaƟons or NHOs was sent on 01/08/2026.
Thus, as described in the Wireless Infrastructure Second Report and Order (2), if you or Commission staff do not
receive a statement of interest regarding a parƟcular project from any Tribe or NHO within 15 calendar days of
01/08/2026, your obligaƟons under SecƟon IV of the NPA with respect to these Tribal NaƟons or NHOs are complete. If a
Tribal NaƟon or NHO responds that it has concerns about a historic property of tradiƟonal religious and cultural
significance that may be affected by the proposed construcƟon within the 15 calendar day period, the Applicant must
involve it in the review as set forth in the NPA, and may not begin construcƟon unƟl the process set forth in the NPA is
completed.
You are reminded that SecƟon IX of the NPA imposes independent obligaƟons on an Applicant when a previously
unidenƟfied site that may be a historic pr
opert y, including an archeological property, is discovered during construcƟon or
aŌer the compleƟon of review. In such instances, the Applicant must cease construcƟon and promptly noƟfy, among
others, any potenƟally affected Tribal NaƟon or NHO. A Tribal NaƟon's or NHO's failure to express interest in parƟcipaƟng
in pre-construcƟon review of an undertaking does not necessarily mean it is not interested in archeological properƟes or
human remains that may inadvertently be discovered during construcƟon. Hence, an Applicant is sƟll required to noƟfy
any potenƟally affected Tribal NaƟon or NHO of any such finds pursuant to SecƟon IX or other applicable law.
Sincerely,
Ellen Saint Onge
Federal PreservaƟon Officer
Federal CommunicaƟons Commission
ellen.saintonge@fcc.gov
_______________________________________
36
Tribe Name: Muscogee (Creek) NaƟon
TCNS# 301523 Referred Date: 01/07/2026 LocaƟon: Camden Highway, Rembert, SC
Detailed DescripƟon of Project: Harmoni Towers LLC proposes to construct a 279-foot Self-Support CommunicaƟons
Tower, with an overall height of 283 feet and associated equipment within a 75-foot by 75-foot (5,625-square-foot) lease
area.
Tribe Name: Thlopthlocco Tribal Town
TCNS# 301460 Referred Date: 01/07/2026 LocaƟon: W2655 US Highway 10, Granton, WI
Detailed DescripƟon of Project: New wireless communicaƟons antennas at centerline height of 165Ō on a 180Ō-tall self-
support laƫce communicaƟons tower with overall height of 189.3Ō. Equipment will be installed in a 10Ōx15Ō lease area
within the exisƟng fenced compound.
Tribe Name: Chippewa Cree Tribe of the Rocky Boy's ReservaƟon
Tribe Name: Ho-Chunk NaƟon
Tribe Name: Iowa Tribe of Oklahoma
Tribe Name: Keweenaw Bay Indian Community
Tribe Name: Kickapoo Tribe of Oklahoma
Tribe Name: Lac Courte Oreilles Band of Lake Superior Chippewa Indians of Wisconsin
Tribe Name: Lac Vieux Desert Band of Lake Superior Chippewa Indians
Tribe Name: Lower Brule Sioux Tribe
Tribe Name: Menominee Indian Tribe of Wisconsin
Tribe Name: Mille Lacs Band of Ojibwe Indians
Tribe Name: Omaha Tribe of Nebraska
Tribe Name: Otoe-Missouria Tribe of Indians
Tribe Name: OƩawa Tribe of Oklahoma
Tribe Name: Ponca Tribe of Indians of Oklahoma
Tribe Name: Red Cliff Band of Lake Superior Chippewa Indians of Wisconsin
Tribe Name: Rosebud Sioux Tribe
Tribe Name: Santee Sioux NaƟon of Nebraska
Tribe Name: Sisseton-Wahpeton Oyate of the Lake Traverse ReservaƟon
Tribe Name: WyandoƩe NaƟon
TCNS# 301437 Referred Date: 01/07/2026 LocaƟon: Highway 89, Glen Canyon Rec Area, Greenehaven, AZ
Detailed DescripƟon of Project: Our client proposes to build a 99-Ō. monopole in a 50-Ō.x50-Ō. lease area (LA). A 12-Ō.-
wide easement will run approx. 490 Ō. E from the LA, then the fiber conduit will conƟnue approx. 450 Ō. NE. An exisƟng
1,580-Ō. power route will be used.
Tribe Name: Apache Tribe of Oklahoma
Tribe Name: Eastern Shoshone Tribe
Tribe Name: Havasupai Tribe
Tribe Name: Hualapai Tribe
Tribe Name: Mescalero Apache Tribe
Tribe Name: Navajo NaƟon
Tribe Name: Pueblo of Zuni
Tribe Name: San Carlos Apache Tribe
TCNS# 301235 Referred Date: 01/07/2026 LocaƟon: 4698A Costa Bravo Drive, Orlando, FL
Detailed DescripƟon of Project: Our client proposes to construct a 29Ō pole and associated wireless communicaƟons
antennas with an overall height of 35Ō. Power/uƟliƟes will be routed approx. 138Ō southwest to a new Duke pole
mounted transformer.
Tribe Name: CoushaƩa Indian Tribe
Tribe Name: Seminole Tribe of Florida
Tribe Name: Thlopthlocco Tribal Town
December 2, 2025
Tuscarora Nation
Mr. Bryan Printup
5226 Walmore Rd
Lewiston, NY 14092
RE: Harmoni Towers LLC
Trileaf Project # 772867 / SC0009812 / Borden
Camden Highway, Rembert, Sumter County, SC 29128
Latitude: 34° 4’ 2.59” N, Longitude: 80° 30’ 34.85” W
TCNS # 301523
Dear Mr. Printup:
This project was originally submitted in TCNS on 9/19/2025. Trileaf Corporation is in the process of
completing a NEPA Review at the above referenced property. Our investigation includes determining if
the site is contained in, on, or within the viewshed of a building, site, district, structure or object, significant
in American history, architecture, archeology, engineering or culture, that is listed or eligible for listing on
the State or National Registers of Historic Places, or located in or on, or within the viewshed of an Indian
Religious Site. Trileaf has learned your tribe has an interest in property located within this County.
Our client proposes to construct a 279-foot Self-Support Communications Tower, with an overall height of
283 feet and associated equipment within a 50-foot by 50-foot fenced area within a 75-foot by 75-foot
(5,625-square-foot) lease area. The project includes a 12-foot-wide gravel drive within an access/utility
easement, measuring 30 feet wide, extending approximately 20 feet generally northeast away from the lease
area towards Camden Highway. The proposed access/utility easement and tower compound lease area are
located with an agricultural field.
The form 620/621 submission packet is attached for your review. Please let us know if you have any
objections or comments on this project as soon as possible. Contact me at (314) 997-6111 or email
tribal@trileaf.com if you have any questions. Thank you for your assistance in this regard.
Sincerely,
Michael Romanoski
Tribal Consultation Manager
1515 Des Peres Road, Suite 200, Saint Louis, Missouri 63131 - 314.997.6111 www.trileaf.com
Appendix G
Resumes
HANNAH DELL
ASSISTANT PROJECT MANAGER
Education
Biology, B. S.
University of North Georgia / Gainesville, GA
Areas of Expertise
Ms. Dell has experience performing site inspections and conducting environmental due diligence pursuant
to EPA All Appropriate Inquiries (AAI) and the American Society of Testing and Materials (ASTM) for
commercial real estate and lending projects. Additionally, Ms. Dell has experience performing National
Environmental Policy Act (NEPA) reviews for wireless telecommunications projects.
Environmental service expertise includes:
Phase I Environmental Site Assessments
Historical City Directories
Information Section 7 Consultation
National Wetland Inventory Maps
Flood Insurance Rate Maps
Critical Habitat Maps
Environmental Evaluation Summaries
Archaeological and Architectural Impacts
Soil Characterization
Field Reconnaissance
Section 106 Compliance
NEPA Environmental Assessments
Migratory Bird Evaluations
Form 620/621 Submittals
Historical Topographic Maps and Aerial Imagery
Local Government Consultation
Native American Consultation
Land Use History
Certifications/Affiliations
ANSI/FCC RF Radiation Safety Competent Person
Basic Wetland Delineation (2023)
Professional Resume
LAURA ELSTON
ASSISTANT PROJECT MANAGER II
Education
B.S. Marine Science
Jacksonville University / Jacksonville, FL
Areas of Expertise
Ms. Laura Elston has experience performing site inspections and conducting environmental due diligence
pursuant to EPA All Appropriate Inquiries (AAI) and the American Society of Testing and Materials
(ASTM) for commercial real estate and lending projects.
Ms. Elston has experience performing National Environmental Policy Act (NEPA) reviews for wireless
telecommunications projects.
Environmental service expertise includes:
Phase I Environmental Site Assessments
Phase II Environmental Site Assessments
Historical City Directories
Indoor Air Quality Assessments
Information Section 7 Consultation
National Wetland Inventory Maps
Flood Insurance Rate Maps
Critical Habitat Maps
Soil Characterization
Field Reconnaissance
Section 106 Compliance
NEPA Environmental Assessments
Migratory Bird Evaluations
Form 620/621 Submittals
Historical Topographic Maps and Aerial Imagery
Local Government Consultation
Native American Consultation
Land Use History
Certifications/Affiliations
OSHA 40-Hour HAZWOPER
ANSI/FCC RF Radiation Safety Competent Person
Basic Wetland Delineation (2014) and Refresher Course (2019)
Member – The Wildlife Society
Professional Resume
MORGAN RASMUSSEN
SENIOR PROJECT MANAGER
Education
Environmental Science, B. S.
Georgia College & State University / Milledgeville, GA
Areas of Expertise
Ms. Rasmussen has experience performing site inspections and conducting due diligence pursuant to EPA
All Appropriate Inquiries (AAI) and the American Society of Testing and Materials (ASTM) for
commercial real estate and lending projects. Additionally, Ms. Rasmussen has experience performing
National Environmental Policy Act (NEPA) reviews for wireless telecommunications projects.
Environmental service expertise includes:
Phase I Environmental Site Assessments
Historical City Directories
Information Section 7 Consultation
National Wetland Inventory Maps
Flood Insurance Rate Maps
Critical Habitat Maps
Environmental Evaluation Summaries
Archaeological and Architectural Impacts
Soil Characterization
Field Reconnaissance
Section 106 Compliance
NEPA Environmental Assessments
Migratory Bird Evaluations
Form 620/621 Submittals
Historical Topographic Maps and Aerial Imagery
Local Government Consultation
Native American Consultation
Land Use History
Certifications/Affiliations
ANSI/FCC RF Radiation Safety Competent Person
Professional Resume
Exhibit 4
Exhibit 5
ASR Registration Search
Registration 1332844
Map Registration
Registration Detail
Reg Number 1332844 Status Granted
File Number A1352612 Constructed
EMI No Dismantled
NEPA
Antenna Structure
Structure Type
LTOWER - Lattice Tower
Location (in NAD83 Coordinates)
Lat/Long 34-04-02.6 N 080-30-34.9 W Address Camden Highway
City, State Sumter , SC
Zip 29128 County SUMTER
Center of
AM Array
Position of Tower
in Array
Heights (meters)
Elevation of Site Above Mean Sea Level Overall Height Above Ground (AGL)
73.8 86.3
Overall Height Above Mean Sea Level Overall Height Above Ground w/o Appurtenances
160.1 85.0
Painting and Lighting Specifications
FAA Chapters 4, 8, 15
Paint and Light in Accordance with FAA Circular Number 70/7460-1M
FAA Notification
FAA Study 2025-ASO-18996-OE FAA Issue Date 12/29/2025
Owner & Contact Information
FRN 0025999053 Owner Entity
Type
Limited Liability Company
Owner
Harmoni Towers, LLC
Attention To: SC0009812
6210 Ardrey Kell Road
Suite 450
Charlotte , NC 28277
P: (800)821-5825
F: (501)537-0769
E: regulatory@harmonitowers.com
Contact
Harmoni Towers, LLC
Charlotte , NC 28277
P: (800)821-5825
F: (501)537-0769
E: regulatory@harmonitowers.com
Last Action Status
Status
Granted Received 03/09/2026
Purpose Amendment Entered 03/09/2026
Mode Interactive
Related Applications
9/3/26, 12:11 PM ASR Registration 1332844
https://wireless2.fcc.gov/UlsApp/AsrSearch/asrRegistration.jsp?regKey=2733355&printable 1/2
03/09/2026 A1352612 - Amendment (AM)
Comments
Comments
None
History
Date Event
None
Pleadings
Pleading Type Filer Name Description Date Entered
None
Automated Letters
None
9/3/26, 12:11 PM ASR Registration 1332844
https://wireless2.fcc.gov/UlsApp/AsrSearch/asrRegistration.jsp?regKey=2733355&printable 2/2
Exhibit 6
ULS License
PCS Broadband License - KNLH718 - Cellco Partnership
Call Sign KNLH718 Radio Service CW - PCS Broadband
Status Active Auth Type Regular
Rural Service Provider Bidding Credit
Is the Applicant seeking a Rural Service Provider (RSP)
bidding credit?
Reserved Spectrum
Reserved Spectrum
Market
Market BTA436 - Sumter, SC Channel Block F
Submarket 0 Associated
Frequencies
(MHz)
001890.00000000-
001895.00000000
001970.00000000-
001975.00000000
3.7 GHz License
Type
3.7 GHz Linked
License
Dates
Grant
04/04/2017 Expiration 04/28/2027
Effective 04/04/2017 Cancellation
Buildout Deadlines
1st
04/28/2002 2nd
Discontinuance Dates
1st
2nd
Notification Dates
1st
11/16/2004 2nd
ECIP Information
ECIP Flag
Small Carrier or
Tribal Nation
Transaction
Rural-Focused
Transaction
ECIP Dates
5-Year Holding
Period Begins
5-Year Holding
Period Ends
Required Operational Filing Dates
IORN Operation
Begin Date
FORN Deadline
Date
FORN Filed Date
Licensee
FRN 0003290673 Type General Partnership
6/11/26, 9:34 AM ULS License - PCS Broadband License - KNLH718 - Cellco Partnership
https://wireless2.fcc.gov/UlsApp/UlsSearch/license.jsp?licKey=10887&printable 1/2
Licensee
Cellco Partnership
5055 North Point Pkwy, NP2NE Network Engineering
Alpharetta, GA 30022
ATTN Regulatory
P:(770)797-1070
F:(770)797-1036
E:LicensingCompliance@VerizonWireless.com
Contact
Cellco Partnership
Licensing Manager
5055 North Point Pkwy, NP2NE Network Engineering
Alpharetta, GA 30022
ATTN Regulatory
P:(770)797-1070
F:(770)797-1036
E:LicensingCompliance@VerizonWireless.com
Ownership and Qualifications
Radio Service Type Mobile
Regulatory Status Common Carrier Interconnected Yes
Alien Ownership
Is the applicant a foreign government or the representative of any
foreign government?
No
Is the applicant an alien or the representative of an alien? No
Is the applicant a corporation organized under the laws of any foreign
government?
No
Is the applicant a corporation of which more than one-fifth of the
capital stock is owned of record or voted by aliens or their
representatives or by a foreign government or representative thereof
or by any corporation organized under the laws of a foreign country?
No
Is the applicant directly or indirectly controlled by any other
corporation of which more than one-fourth of the capital stock is
owned of record or voted by aliens, their representatives, or by a
foreign government or representative thereof, or by any corporation
organized under the laws of a foreign country?
Yes
If the answer to the above question is 'Yes', has the applicant received
a ruling(s) under Section 310(b)(4) of the Communications Act with
respect to the same radio service involved in this application?
Yes
Basic Qualifications
The Applicant answered "No" to each of the Basic Qualification questions.
Tribal Land Bidding Credits
This license did not have tribal land bidding credits.
Demographics
Race
Ethnicity Sex
6/11/26, 9:34 AM ULS License - PCS Broadband License - KNLH718 - Cellco Partnership
https://wireless2.fcc.gov/UlsApp/UlsSearch/license.jsp?licKey=10887&printable 2/2
Exhibit 7
Connecting America
Harmoni Towers Gateway LLC
6210 Ardrey Kell Rd.
Suite 375
Charlotte, NC 28277
501.621.0521 | harmonitowers.com
June 8, 2026
Sumter City-County Planning
PO Box 1449
Sumter, SC 29151
RE: Harmoni Towers Gateway LLC (CELL TOWER) located at 7056 Camden Highway, REMBERT, SC
29128
Dear Planning Dept.
Harmoni Towers Gateway LLC, as the owner of the proposed communications tower to be located at
the above referenced property, hereby affirms that if the tower is no longer being used it will be
removed within 180 days of the cessation of operation.
Regards,
Evelyn Radowicz
Evelyn Radowicz, Director, Project Management
413-658-4815
Evelyn.radowicz@harmonitowers.com
Exhibit 8
April 1, 2026
Sumter County
13 East Canal Street
Sumter, S.C. 29150
To Whom it May Concern:
Harmoni Towers Gateway LLC, as applicant, and to the extent permitted by the law, shall at all times defend,
indemnify, protect, save, hold harmless, and exempt Sumter County, and its officers, boards, employees,
committee members, attorneys, agents, and consultants from any and all damages, costs, or charges arising out of
any and all third party claims, suits, demands, causes of action or expenses arising there from, either at law or in
equity, which might arise out of, or are caused by, the construction, use, operation, maintenance, replacement,
removal, or restoration of the proposed telecommunications facility, excepting, however, any portion of such
claims, suits, demands, causes of action or award of damages as may be attributable to the gross negligent or
intentional acts or omissions of Sumter County, or its servants or agents.
Additionally, Harmoni Towers Gateway LLC warrants that the proposed telecommunications facility shall,
at all times, comply with all applicable, local, state and governmental rules and regulations including all FCC rules
and regulations. Moreover, Harmoni Towers Gateway LLC shall at all times maintain commercial general liability
insurance with limits of not less than $1,000,000 aggregate for the duration of the proposed telecommunications
facility.
Harmoni Towers Gateway LLC
By: Riken Patel
Its: Assistant General Counsel
Dated: April 1, 2026
Page 1 of 1
Building and Operating Mission Critical Telecom Infrastructure
Harmoni Towers LLC
6210 Adrey Kell Drive, Suite 375
Charlotte, NC 28277
harmonitowers.com
Exhibit 9
INSR ADDL SUBR
LTR INSR WVD
DATE (MM/DD/YYYY)
PRODUCER CONTACT
NAME:
FAXPHONE
(A/C, No):(A/C, No, Ext):
E-MAIL
ADDRESS:
INSURER A :
INSURED INSURER B :
INSURER C :
INSURER D :
INSURER E :
INSURER F :
POLICY NUMBER
POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY)
COMMERCIAL GENERAL LIABILITY
AUTOMOBILE LIABILITY
UMBRELLA LIAB
EXCESS LIAB
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
AUTHORIZED REPRESENTATIVE
INSURER(S) AFFORDING COVERAGE NAIC #
Y / N
N / A
(Mandatory in NH)
ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?
EACH OCCURRENCE $
DAMAGE TO RENTED $PREMISES (Ea occurrence)CLAIMS-MADE OCCUR
MED EXP (Any one person) $
PERSONAL & ADV INJURY $
GENERAL AGGREGATE $GEN'L AGGREGATE LIMIT APPLIES PER:
PRODUCTS - COMP/OP AGG $
$
PRO-
OTHER:
LOCJECT
COMBINED SINGLE LIMIT
$(Ea accident)
BODILY INJURY (Per person) $ANY AUTO
OWNED SCHEDULED BODILY INJURY (Per accident) $AUTOS ONLY AUTOS
AUTOS ONLY
HIRED PROPERTY DAMAGE $AUTOS ONLY (Per accident)
$
OCCUR EACH OCCURRENCE $
CLAIMS-MADE AGGREGATE $
DED RETENTION $ $
PER OTH-
STATUTE ER
E.L. EACH ACCIDENT $
E.L. DISEASE - EA EMPLOYEE $
If yes, describe under
E.L. DISEASE - POLICY LIMIT $DESCRIPTION OF OPERATIONS below
POLICY
NON-OWNED
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer any rights to the certificate holder in lieu of such endorsement(s).
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
CERTIFICATE HOLDER CANCELLATION
© 1988-2015 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORDACORD 25 (2016/03)
ACORDTM CERTIFICATE OF LIABILITY INSURANCE
Hanover Insurance Company
The Continental Insurance Company
Allmerica Financial Benefits
3/20/2026
McGriff, a MMA LLC Company
5850 Waterloo Road, Suite 240
Columbia, MD 21045
410 480-4400
mcg.coi@marshmma.com
Harmoni Towers LLC
6210 Ardrey Kell Road
Suite 375
Charlotte, NC 28277
22292
35289
41840
A X
X
X
X ZHQH39487607 12/02/2025 12/02/2026 1,000,000
1,000,000
10,000
1,000,000
2,000,000
2,000,000
C
X X
X AWQJ29289103 12/02/2025 12/02/2026 1,000,000
A
B
X
X
X
X 0
X
X
UHQH39506406
7036404314
12/02/2025
12/02/2025
12/02/2026
12/02/2026
10,000,000
10,000,000
Ea Occ/Agg 16,000,000
Evidence of Coverage
*
*ADDITIONAL NAMED INSUREDS**
Alpha Towers HoldCo III LLC
Alpha Towers PropCo III LLC
Harmoni Completed Towers, LLC
Harmoni Network Services, LLC
Harmoni Towers Gateway LLC
11101 Anderson Dr, Ste 200
Little Rock, AR 72212
1 of 2
#S39403031/M38982164
140PALISCOMClient#: 2209128
JMBU
1 of 2
#S39403031/M38982164
SAGITTA 25.3 (2016/03)
DESCRIPTIONS (Continued from Page 1)
Harmoni Towers Assetco II, LLC
Har
moni Towers Assetco, LLC
Harmoni Towers Development Company Holdings I, LLC
Harmoni Towers Development Company Holdings II, LLC
Harmoni Towers Development Company, LLC
Harmoni Towers Gateway LLC
Harmoni Towers Holdings, LLC
Harmoni Towers Infrastructure, LLC
Harmoni Towers Management, LLC
Harmoni Towers, L.P.
2 of 2
#S39403031/M38982164
Exhibit 10
Exhibit 11
1201 S Sheridan St
South Bend, IN 46619
Phone: 574-288-3632
Fax: 574-288-5860
www.nelloinc.com
June 5, 2026
Harmoni Towers, LLC
11101 Anderson Dr. Suite 200
Little Rock, AR 72212
Re: Nello Tower Fall Radius – Nello 280’ NSX Lattice Self-Sup port Tower
Project Name: Borden
Nello Job #: SO35537
Tower Drawing #: 857811
To Whom It May Concern:
This letter is regarding your inquiry about the expected performance of your proposed tower designed by Nello
based on site-specific criteria.
Our towers are designed to meet or exceed industry standards defined by TIA-222-H, “Structural Standards for
Antenna Supporting Structures and Antennas” (TIA Standard). It is our opinion that the possibility of a tower
collapse is very unlikely. The tower is designed using extreme wind and ice conditions. In fact, wind speeds
specified by the TIA Standard are 50-year wind speeds. That is, they have only a 2% statistical chance of occurring
in any given year.
This tower has been designed using the following wind conditions as a minimum: a 119 mph 3-second gust wind
speed with no ice and a 30 mph 3-second gust wind with 1” ice. The TIA Standard specifies 119 mph as the wind
speed required for this site in Sumter County, South Carolina. The “3-second gust wind speed” refers to a wind
measured at 33 feet above the ground. Equations in the TIA Standard take into account that wind speed escalates
with increasing height of the tower.
Although we cannot guarantee exactly how a tower would fall if it were to fail, the most likely mode of failure
would be a buckling failure of one of the tower sections due to excessive wind loading. The tower leg with the
highest stress ratio is located at the 220’ – 240’ level. The stress ratio in that leg is calculated to be 91% of the code-
permitted design loading. Given that the tower section with the highest stress ratio will most likely fail first, the
proposed tower would fail at the 220’ level with the top 60’ of the tower collapsing. Depending on the conditions at
the time of failure and the stress levels in structural material below, the top 60’ of the tower would likely fall within
a 60’ fall radius.
The fall radius statement above assumes proper foundation construction and tower installation. The foundation
design should be reviewed to ensure that no foundation limit state governs the entire structural system and negates
the fall radius design. The fall radius expectancy requires that the foundation be designed with a capacity greater
than that of the tower capacity. If the foundation design used in association with this tower is performed by a third
party, Nello must be provided the opportunity to review the design in order to confirm that the fall radius remains
satisfactory. If for some reason Nello does not provide the tower design, or is not given the opportunity to design or
review the foundation for this specific project, the content of this letter becomes void.
If you have any other questions or concerns regarding the design of your site-specific tower, please contact our
engineering or sales department.
Sincerely,
06/09/2026
Exhibit 12
Exhibit 13
Norton Rose Fulbright US LLP is a limited liability partnership registered under the laws of Texas.
Norton Rose Fulbright LLP, Norton Rose Fulbright Canada LLP, and Norton Rose Fulbright US LLP are separate legal entities and all of them are members
of Norton Rose Fulbright Verein, a Swiss verein. Norton Rose Fulbright Verein helps coordinate the activities of the members but does not itself provide legal
services to clients. Details of each entity, with certain regulatory information, are available at nortonrosefulbright.com/le gal-notices.
Norton Rose Fulbright US LLP
8001 Forsyth Boulevard, Suite 800
St. Louis, Missouri 63105
Direct line +1 314 505 8871
sasha.riedisser@nortonrosefulbright.com
Tel +1 314 505 8800
Fax +1 314 505 8899
nortonrosefulbright.com
October 5, 2026
Re: BZA Case No. BOA-26-29
Dear Mr. Bryan:
Thank you very much for taking the time to speak with me on Friday. I appreciated your
willingness to talk through the issues in advance of the next hearing. As we discussed, I am writing
to set out our position regarding approval of Harmoni Gateway Towers , LLC ’s (“Harmoni”)
application for a communications facility at 7056 Camden Highway, which the Sumter City -
County Board of Zoning Appeals deferred at its September 9, 2026 hearing. I want to be clear at
the outset that our goal is not to create friction with the County. Our goal is to work cooperatively
with you, the Zoning Administrator, and the Board to deliver reliable wireless coverage to this part
of the County.
We understand that concerns have been raised about the proximity of the facility to the road, and
that the deferral at the September hearing was prompted by questions about the engineered fall
zone rather than by any staff finding of noncompliance. As we understand it, the underlying worry
is that the structure could fall onto the highway during a storm, and that the highway serves as an
evacuation route.
The County’s ordinance sets the rule that both Harmoni and the County are bound to follow, and
Harmoni meets it. Article 5.b.4.e.10 of the Sumter County Zoning and Development Standards
Ordinance requires that a tower be set back from all lot lines by a distance equa l to the district
setback requirement or the tower’s fall zone, whichever is greater, and it expressly provides that a
fall zone less than the full height of the tower is to be determined by an engineer licensed in South
Carolina in a letter bearing the engineer’s signature and seal.
That is precisely the mechanism the ordinance contemplates for exactly this question, and it is the
mechanism we have followed. Our fall-zone letter is signed and sealed by an engineer licensed in
South Carolina and confirms the structural integrity of the structure and the radius within which it
is designed to fall.
Moreover, a generalized concern of this kind is not a lawful basis for denying the application,
particularly where the concern has been answered by a stamped engineering analysis. Under the
Telecommunications Act of 1996, any decision denying a request to place or construct a personal
wireless service facility must be in writing and supported by substantial evidence contained in a
written record.
John Bryan
October 5, 2026
Page 2
The Fourth Circuit ’s decision in Petersburg Cellular Partnership v. Board of Supervisors of
Nottoway County, 205 F.3d 688 (4th Cir. 2000), is closely on point and we believe it controls the
analysis here. There, a county denied a permit for a 199 -foot tower on a U.S. highway after a
handful of residents voiced speculative safety fears, including the fear that t he tower would
collapse onto people or homes and that debris might land on the adjacent federal highway. The
court held the denial was not supported by substantial evidence. It expl