RecordWell Data

Revised DRB app.pdf

Town of Sullivan's Island · Charleston County · Other

Open the original document More from Town of Sullivan's Island

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

1 SULLIVAN’S ISLAND DESIGN REVIEW BOARD SUBMITTAL APPLICATION (PAGE 1) PROPERTY ADDRESS: _________________________________ PARCEL ID (TMS #): _____________________ SUBMITTAL DATE: ________________ MEETING DATE: ________________ REQUEST: CONCEPTUAL REVIEW: ____ PRELIMINARY APPROVAL: ___ FINAL APPROVAL: ___ DESCRIPTION OF SCOPE OF WORK: ___________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ___ Submittal outside of the Historic District, not classified historic, and requests DRB relief. ___ Submittal is outside of the Historic District and designated as a historic resource. ____ DRB relief requests ____ No DRB requests ___ Submittal is within the Historic District and is: ____ designated as Historic Resource ___ DRB relief requests ___No DRB requests ____ Not designated as a Historic Resource: ___DRB relief requests ___ No DRB requests DRB SUBMITTAL CHECKLIST: The following items must be included in the submittal for placement on the DRB agenda. ___Application fee (Historic properties: $116.00; New constructions: $1,280; Addition/renovations: $426.60) ___Completes and signed submittal application (Page 1). (All submissions) ___ Zoning Standards Compliance Worksheet (Page 2). (All submissions with relief requests) ___ Neighborhood Compatibility Worksheet (Page 3). (All submissions with relief requests) ___ Historic Design Review Worksheet (Page 4). (All submissions involving a designated Historic Resource) ___ Online submittal through BSA; Town of Sullivan’s Island online submittal portal. ___ Two (2) sets of drawings, no bigger than 11X17”; Drawings to include: __ A current as-built survey, Certified by a S.C. Registered Land Surveyor [ 1/16"= 1'-0" OR 1"= 20'-0" Required for all new construction and for work which expands or is outside of an existing building footprint; illustrating the following: • All applicable Flood Zone information • Setbacks, property lines and easements • Spot elevations required to comply with § 21-24 • OCRM Critical Lines, or Baseline and Setback if applicable • Existing Structures, if applicable __Site Plan [ 1/16" = 1'-0" OR 1" = 20'-0" scale ], illustrating the following: • Existing structures, if applicable • Proposed new structures • All applicable survey information • Narrative for Scope of Work (all Historic projects) __Floor Plans [ 1/8" = 1'-0" scale ], with the following requirements: • Exterior dimensions • Graphically depict the outlines of heated space, covered porches and open decks. • In the case of renovations and/or additions, the outlines of existing and new construction must also be shown. __Exterior Elevations [ 1/8" = 1'-0" scale ], with the following requirements: • All exterior materials such as wood, stucco, roofing and / or masonry shall be graphically represented for intent. • Must be rendered with shadows depicting roof and / or deck overhangs, changes in wall plane, or massing. • Roof ridge heights to natural grade. Finished Floor Elevation (FFE), Lowest Structural Member (LSM), Base Flood Elevation (BFE) to finish grade. • Detailed descriptions of treatment of all historic materials. (all Historic projects ___Conditional/Optional: • 3-D perspective sketches and / or models, as well as streetscape renderings that include adjacent properties are always encouraged and are required for submissions with requests for relief, additional coverage, or additional square footage. • Any relevant photographs or documentation that might be descriptive (of adjacent properties). OWNER NAME: ______________________________ PHONE NUMBER: _______________________________ ADDRESS: ___________________________________________________ EMAIL: _________________________ ARCHITECT/DESIGNER: ___________________________ PHONE NUMBER: __________________________ ADDRESS: _____________________________________________ EMAIL: _______________________________ CONTRACTOR: ______________________________ PHONE NUMBER: ________________________________ ADDRESS: _____________________________________________ EMAIL: _______________________________ _________(Initials): I understand that incomplete applications will be rejected. I (we) submit that the above information is true If Owner is not the Applicant: to the best of my (our) knowledge. I (we) hereby appoint the person named as applicant as my (our) agent to represent me (us) in this application __________________________________________________ ________________________________________________________ Applicant name (print) Owner’s signature ____________________________________________ __________________________________________________ Applicant’s signature Owner’s signature 2 ZONING STANDARDS COMPLIANCE WORKSHEET (PAGE 2) Zoning ordinance reference section Zoning Standard ✓if meets standard DRB's Max. authorty for relief applicant request for relief Percent (%) relief requested Total allowed + requested relief (SF) A 21-22 FRONT SETBACK 25 Feet 15% B 21-22 ADDITIONAL FRONT YARD SETBACK 45 above 20' 15% C 21-22 SIDE SETBACK per lot: Enter result: _____min: ____comb: 25% D 21-22 SECOND STORY SIDE SETBACK per lot: Enter result: _____min: ____comb: 25% E 21-22 REAR SETBACK 25 feet N/A X X X F 21-25 PRINCIPAL BUILDING COVERAGE as per formula:enter result ___________sf 20% G 21-26 IMPERVIOUS COVERAGE as per formula:enter result 30% sf maximum N/A X X X H 21-27 PRINCIPAL BUILDING SQUARE FOOTAGE as per formula:enter result ___________sf A: New Construction / Non-historic additions: 15% ____________sf (not to exceed 500 sf) B: Historic additions: 20%_____________sf C: Historic ADU Special Exceptions: I 21-28 THIRD STORY as per formula:enter result ___________sf 15% ____________sf J 21-22 PRINCIPAL BUILDING FRONT FAÇADE 50' feet or, 2/3 lot width (whichever is less) 15% K 21-22 PRINCIPAL BUILDING SIDE FAÇADE 38 feet (wall length) 16 feet within 15 ft x 2 16-in articulations 25% L 21-22 2ND STORY SIDE FAÇADE SETBACK 32 feet (wall length) 6-foot (knee wall) 16-in articulations 25% M 21-30 BUILDING ORIENTATION towards ocean, excluding marsh and ocean lots Adjust for Neighborhood Compatablity N 21-30 BLDG. FOUNDATION HEIGHT 8' to LSM & 9'4" to FFE 1 foot O 21-32 FOUNDATION ENCLOSURE 1/2" space Adjust for Neighborhood Compatablity P 21-138 ACCESSORY STRUCTURE Height (15 to 18) Setback (20) 20% Height (3 ft 6 in) 40%(4') SETBACKSLOT COVERAGEDESIGN STANDARDS 3 NEIGHBORHOOD COMPATIBILTY WORKSHEET (PAGE 3) Have you reached out to the neighbors to get their feedback on the proposed plans? Yes: ___ No: ___ In accordance with the Sullivan’s Island Zoning Ordinance, Section 21-111, the DRB shall only grant modifications of the Zoning Ordinance standards if the design is compatible with the surrounding neighborhood. See the DRB application submittal guidance document for additional information for filling in this form. Lot area: _______sf Highland lot area: ______sf (if applicable) Principal Building Square Footage (21-27): Existing SF: ________ Standard SF: ________ Proposed SF: ________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ Principal Building Coverage (21-25): Existing SF: ________ Standard SF: ________ Proposed SF: ________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ Front/Side/2nd-Story Building Setbacks (21-22): Standard, combined ______ Proposed, combined______, min _______ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ _____________________________________________________________________________________________ Second Story Side Façade Setback (21-22): Requested relief: _______________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ Principal Building Side Façade Setback (21-22): Requested Relief: _________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ Other (circle any that apply): Third Story, Principal Building Front Façade, Building Orientation, Building Foundation Height, Foundation Enclosure, or Accessory Structure: ____________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ 4 REQUEST FOR HISTORIC DESIGN REVIEW (PAGE 4) Do you propose any exterior changes to the historic structure? Yes: _______ No: _______ If you answered “yes” , please provide a detailed explanation and sequence of the work below: Section 21-97. C Historic Preservation Standards: Submit in writing and be prepared to describe how your project is consistent with the following ten preservation standards, and the most recent version of the Secretary of Interior’s Guidelines for the Treatment of Historic Properties. **On your elevation drawings show all existing conditions and proposed changes. Detail existing materials and highlight all new and preserved architectural and structural elements. https://www.nps.gov/tps/standards/treatment-guidelines-2017.pdf (a) Using a property as it was used historically or giving a new use that requires minimal change to its distinctive materials, features, spaces, and spatial relationships; (b) Retaining and preserving the historic character of a property; avoidance of the removal of distinctive materials or alteration of features, spaces, and spatial relationships that characterize a property; (c) Avoiding changes that create a false sense of historical development, such as adding conjectural features or elements from other buildings; (d) Retaining and preserving changes to a property that have acquired historic significance in their own right; (e) Preserving distinctive materials, features, finishes, and construction techniques or examples of craftsmanship that characterize a property; (f) Repairing rather than replacing deteriorated historic features; or where the severity of deterioration requires replacement of a distinctive feature, the new feature will match the old in design, color, texture, and, where possible, materials; (g) Utilizing the gentlest means of chemical or physical treatments; (h) Protecting and preserving the archeological resources in place, and if disturbing, mitigation measures will be undertaken; (i) Not destroying historic materials, features, and spatial relationships that characterize the property; differentiating the new work from the old and making it compatible with the historic materials, features, size, scale, and proportion, and massing to protect the integrity of the property and its environment; and, (j) Undertaking new construction in such a manner that, if removed in the future, the essential form and integrity of the historic property and its environment would be unimpaired. ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ ______________________________________________________________________________________________ (Please use extra sheet as needed)

Source: Town of Sullivan's Island website. First collected Oct 31, 2026.