TOWN OF SEABROOK ISLAND
Board of Zoning Appeals Meeting
July 30, 2021 – 2:30 PM
Virtual Meeting Hosted via Zoom
Live Streamed on YouTube
MINUTES
Present: Walter Sewell (Chair), John Fox, Janet Gorski, Bob Leggett, Joe Cronin (Zoning
Administrator), Katharine Watkins (Town Clerk)
Absent: Tom Pinckney
Guests: Keith Murphy (3North), Chip Olsen (Seabrook Island Real Estate), Jay Hugo
(Earthsource), Katrina Burrell (SIPOA), Larry Buchman (Seabrook Island Club)
Chairman Sewell called the meeting of the Board of Zoning Appeals to order at 2:35 PM. Zoning
Administrator Cronin confirmed that the requirements of the Freedom of Information Act were
fulfilled, and the meeting was properly posted. Chairman Sewell introduced himself and members of
the Board to those watching the meeting remotely and confirmed that a quorum was present.
APPROVAL OF MINUTES
1. Board of Zoning Appeals Meeting: June 29, 2021: Mr. Fox made a motion to approve the
minutes from the June 29, 2021, meeting, as submitted. Ms. Gorski seconded the motion. The
motion was APPROVED by a vote of 4-0.
PUBLIC HEARING ITEMS
1. Variance #175: Tax Map # 149-01-00-092: Chairman Sewell introduced the pending variance
request, which was submitted by Reynolds-Williams at Marshwood LLC (Owner) and Keith
Murphy (Applicant). Chairman Sewell disclosed that members of the Board were encouraged
to visit the subject property prior to the hearing for the purpose of viewing existing conditions
at the site, as well as neighboring properties. Members of the Board confirmed that they had
visited the site prior to the meeting. Chairman Sewell added that no testimony was received
during the individual site visits.
Chairman Sewell then called on Zoning Administrator Cronin to provide a brief overview of
Variance Application #17 5. Chairman Sewell administered an oath to Zoning Administrator
Cronin prior to receiving his testimony.
Zoning Administrator Cronin stated that t he property is located off Long Bend Drive and is
currently vacant. It borders the Marsh Walk Villas Horizontal Property Regime to the north
and west and the Club at Seabrook Island’s Racquet Club facilities to the south. A portion of
the property to the north and east is located within an area designated by SCDHEC-OCRM as
a marsh critical area. The total area of the property is 1.824 acres.
He stated that the applicants were seeking to acquire the property for the purpose of
developing up to 12 multi -family homes. He added that t he property is currently zoned
PUD/MF Multi -Family. U nder § 7.60.50 of the Development Standards Ordinance (DSO),
multi-family residential units are a permitted use at this location with a maximum allowable
density of up to 7 dwelling units per acre (1.824 acres x 7 DUA = Up to 12 dwelling units) ,
provided the development meets all other requirements of the DSO.
As part of its due diligence process, Zoning Administrator Cronin stated that the applicant had
prepared a site plan for pr eliminary review by the town prior to closing on the purchase of
the property. Upon reviewing the site plan, the Zoning Administrator determined that the
proposed development plans would not conform to multiple zoning requirements, including:
• A portion of the driveway and vehicular parking area would encroach up to 15 feet
into the required 25-foot marsh setback;
• A portion of the proposed “Unit 8” would encroach up to 7 feet into the required
25-foot marsh setback and up to 8 feet into the required 15-foot marsh setback for
open decks; and
• The required 50-foot landscaped buffer was not included between the proposed
multi-family development and the neighboring Seabrook Island Racquet Club tennis
courts.
As a result of these non-conformities, the applicants sought approval from the Board of
Zoning Appeals to grant relief from the following requirements, as provided by the DSO:
TYPE REQUIRED
PER DSO VARIANCE (REQUESTED)
Marsh Setback § 7.60.50
Reduce the marsh setback from 25 feet to 10 feet (15 -
foot encroachment) to allow for construction of a
driveway and vehicular parking area
Marsh Setback § 7.60.50
Reduce the marsh setback from 25 feet to
approximately 18 feet (7 -foot encroachment) to allow
for construction of an attached multi -family residence
(“Unit 8”)
Marsh Setback § 7.60.50
Reduce the marsh setback for open decks from 15 feet
to 7 feet (8-foot encroachment) to allow for the
encroachment of an open deck (“Unit 8”)
Marsh Area
Requirements § 9.40.10
Modify the requirements of § 9.40.10 to for portions of
the development where one or more variances have
been authorized so as to exempt those areas from the
requirement to retain natural ground cover, or to plant
and maintain such a reas with grass or similar
groundcover, when such areas are located within
twenty-five (25) feet of wetlands, marsh or typical
marsh vegetation as determined by SCDHEC -OCRM
Buffering of
Incompatible Land
Uses
§ 10.30
Eliminate the required 50 -foot landsca ped buffer along
the shared property line with TM # 149 -01-00-093
(Seabrook Island Racquet Club tennis courts)
As part of their variance request, the applicants stated that strict application of the DSO would
result in an unnecessary hardship. In support of their request, the applicants argued:
(1) When the 50 -foot incompatible land use buffer (adjacent to the tennis courts) is
combined with the OCRM and wetland setbacks, the buildable area of the lot is
decreased by approximately 60%. The incompatible land use buffer would also
restrict access to the property from Long Bend Drive.
(2) Condominium buildings located within the adjacent Marsh Walk Villas development
are within a few feet of the tennis courts and do not allow for a 50' buffer separation.
Through GIS observation by the Civil Engineer, the buildings within the Marsh Walk
Villas development also appeared to overstep their 25' OCRM marsh setback.
(3) The application of the zoning requirements to this particular piece of property would
effectively prohibit or unreasonable restrict utilization of the property by allowing
only 4 townhomes of similar size and prohibiting access from Long Bend Drive.
(4) The adjacent property are the existing two tennis courts which are fenced and are not
equipped with lighting. The neighboring Marsh Walk Villas development is already
non-compliant with the 50-foot buffer, and the new townhomes would comply with
the 25 -foot setback from the neighboring residential units. Proposed d ecks would
protrude less than 15 feet into the OCRM Marsh Setback on 2 units (8 and 10). Careful
care and consideration would be implemented for all landscape elements to create
as much buffer as possible between the tennis courts and this development. Pla nt
choices would be carefully picked to fit the local flora of Seabrook Island. The
proposed building designs would be respectful of all SIPOA guidelines, with the
ultimate goal of enhancing the overall unique character of Seabrook Island.
Zoning Administrator Cronin also noted that the proposed site plan anticipated reclamation
of an area which had been designated on the existing site survey by SCDHEC-OCRM as a marsh
critical area. Zoning Administrator Cronin stated that he had spoken with Josh Hoke at the
OCRM Charleston office. He stated that Mr. Hoke informed him that any request to use fill in
a critical area for private gain would likely be denied. A damaged dike, similar to the one on
this property, may be repaired, provided it is repaired in a tim ely manner. Based on earlier
surveys of this property, it appeared that the dike has been breached since at least 2007 and
the area was allowed to “naturalize.” If the applicant were to seek approval to repair the dike
and reclaim the marsh area, they woul d need to go through a full permitting process,
demonstrate that there is no feasible alternative and mitigate for the lost marsh area. Even
then, Zoning Administrator Cronin was informed that there was a very low probability that
the work would be permitted.
Prior to calling on the applicants, Chairman Sewell asked if there were any other questions
for Zoning Administrator Cronin.
Chairman Sewell asked Zoning Administrator Cronin if he could point out the area which
would be reclassified after reclamat ion. He also inquired about the purpose of the existing
24” pipe. Zoning Administrator Cronin guessed that the pipe was likely used as the outfall for
storm drainage from the lagoon.
Mr. Leggett asked whether the lagoon area was located on the subject pro perty or outside.
Zoning Administrator Cronin responded that the lagoon area was on the subject property.
Hearing no additional questions, Chairman Sewell then called on the applicants to provide
additional information related to their variance request. Chairman Sewell administered an
oath to each individual prior to receiving his or her testimony.
• Keith Murphy, 3North (7303 Three Chopped Road, Richmond, VA):
Mr. Muphy gave a brief introduction of himself to the Board. He stated that he has
been visiting Seabrook for many years and believes this proposed project fits the
aesthetic of the area. He also introduced Mr. Hugo, who is the principal engineer on
the project, who will discuss the unique aspects of the property to the Board.
• Chip Olsen, Seabrook Island Reality (2548 High Hammock Road, Seabrook Island, SC):
Mr. Olsen introduced Mr. Murphy and Mr. Hugo from 3North to the board and added
this is the third time th is project has been proposed due to changing market
conditions. Mr. Olsen summarized the history of the property with regards to
stormwater issues dating back fifteen years ago, and how the proposed project will
improve the conditions in that area as they have proposed to rebuild the damaged
stormwater pond and have started to communicate with OCRM on this issue.
• Jay Hugo, 3North/Earthsource (4015 Fitzview Avenue, Richmond, VA):
Mr. Hugo commented to the Board that the design team for this project includes a
civil engineer and environmental engineer from Mount Pleasant who specialize s in
wetlands to ensure that the marshland is protected. He further added that the
proposed use is permitted in the zoning ordinance. He stated that the majority of the
proposed development will conform with the town’s setbacks, but the applicants are
seeking a variance for certain areas due to issues with the stormwater pond, which
they propose to fix, as stated by Mr. Olsen.
Mr. Hugo commented noted that site constraints created pinch points near the
existing stormwater pond, which is why they are seeking relief. He added that the 50’
incompatible use buffer ha s created a significant hardship as the proposed
development would not be able to access Long Bend Drive without a reduction in the
buffer requirement. He further added that the requested relief is consistent with
anticipated changes to the town’s setback requirements as part of the DSO update.
Mr. Hugo summarized how this project will improve the quality of development in the
area with the way it is designed to preserve the environment around it. He believe d
that the placement and aesthetic of the buildings would be desirable.
Chairman Sewell asked if there were any questions for the applicants.
Mr. Leggett noted that the driveway would be a foot or less from the neighboring property
line and asked how the applicants could have any form of meaningful buffer. Mr. Murphy
responded that the applicants would install screening along the driveway.
Mr. Fox stated that it would have been nice to see a representation of the landscaping plans
and added that there doesn’t appear to have been any effort undertaken to mitigate the
reduction of the buffer area. Mr. Olsen responded that the minor changes to the driveway
alignment could be made to accommodate landscaping.
Ms. Gorski asked what the minimum required width of the driveway would be. Mr. Murphy
responded that the driveway would be 22 feet wide. Ms. Gorski noted that there was not
sufficient width to access Long Bend Drive from the property without a reduction of the
buffer. Zoning Administrator Cronin noted that the plan showed a second access point
through Marsh Walk Villas, which would connect the development to Long Bend Drive.
Ms. Gorski noted that the 50-foot buffer appeared to impact the placement 7 of the 12 units,
as well as the driveway.
Mr. Leggett asked if the applicant had spoken with the Seabrook Island Club about the buffer
reduction or with SIPOA about a possible curb cut. Mr. Murphy responded that they have
spoken with the club but not SIPOA. Mr. Larry Buchman stated on behalf of the club that the
club had reviewed the plans and did not have an issue with the requested variance.
Ms. Gorski asked how the new DSO would impact the buffer requirements in this area. Zoning
Administrator Cronin responded that the proposed DSO would reduce the requi red buffer
adjacent to recreational districts from 50 feet to 25 feet. He added that the DSO is currently
in draft form, however, and has not bee n adopted. Therefore, the proposed language is
preliminary and may change prior to adoption.
Chairman Sewell asked if the applicants were aware of the stagnant water in the adjacent 45-
foot drainage easement. Mr. Murphy responded that the applicants were not proposing to
do anything within the drainage easement. Mr. Olsen added that standing water is all around
the island and the lowcountry and is not unique to this particular piece of property.
Mr. Fox asked how the applicants would address runoff from the project. Mr. Murphy
responded that their intent was to repair the dike and restore the stormwater pond , which
would allow the runoff to be discharged as originally intended. Mr. Fox then asked if any
consideration had been given to using pervious pavement. Mr. Murphy responded that their
plans were not far enough along to have considered material selections.
There being no further questions, Chairman Sewell recessed the meeting at 3:38 PM.
The meeting was reconvened at 3:42 PM.
Chairman Sewell then opened the public hearing for comments. Due to the public hearing
being held “virtually” as a result of the on going COVID-19 pandemic, Zoning Administrator
Cronin noted that interested parties were invited to submit written comments regarding the
variance request prior to the meeting via the town’s website, email, mail or in person. He
stated that the town had received over 120 comments in advance of the meeting, including:
• 2 comments in support of the variance request;
• 120 comments in opposition to the variance request;
• 1 general comment; and
• 1 letter of acknowledgement from the Seabrook Island Property Owners Association
Noting a large number of individuals on the Zoom call, Chairman Sewell asked if anyone
wished to make a comment in support of the request. There were no comments in support
of the request.
Chairman Sewell then asked if anyone wished to make a comment in opposition to the
request. There were 7 public comments made in opposition to the request. Chairman Sewell
administered an oath to each individual prior to receiving his or her testimony.
• Leslie Lenhart (SC Environmental Law Project) 510 Live Oak Dr, Mount Pleasant, SC:
Ms. Lenhart stated that she is an attorney with the SC Environmental Law Project and,
on behalf of the Coastal Conservation League , she discussed the letter of opposition
from July 28th that was included in the agenda packet.
Ms. Lenhart summarized the criteria which must be considered by the Board when
determining whether a property qualifies for a variance and stated that she felt the
applicant d id not meet any of these criteria. She further added the variances
requested by the applicant would take away wetland protections. She added that the
applicant should have been aware of the buffer and setback requirements when
purchasing the property and should redesign the project to con form to these
requirements.
Ms. Lenhart commented that approval of this would set a bad precedent for future
developments on the island, and disagreed with the applicants’ comments that the
rebuilding of the stormwater pond would not harm the wetlands.
• Jason Crowley (Coastal Conservation League) 131 Spring Street, Charleston, SC:
Mr. Crowley stated that the applicants should whittle away some of the units as
prescribed in the code to conform to the setback and buffer requirements. He added
the applicant has created a “manmade self -imposed” hardship with regards to the
primary entrance to the development.
Mr. Crowley restated Ms. Lenhart’s comments on the importance of setbacks to
protect the wetlands as the stormwater pond has been found by OCRM to ha ve
naturalized into marshland. He further urged the board to deny this variance.
• Laurie Droze Warren (1532 Strathmore Lane, Mount Pleasant):
Ms. Warren, a property owner of Marsh Walk Villas, commented on how the
proposed road leading into the project would affect the parking spaces in front of
Marsh Walk Villas. Further, the homes would be adjacent to the road which would
leave no buffer between Marsh Walk Villas and the new properties. She added this
would hinder the quality of life for the residents at Marsh Walk Villas.
• Susan Gaston (2024 Long Bend Drive):
Ms. Gaston, a resident of Marsh Walk Villas, commented on how this project will
remove the only guest parking spaces available at Marsh Walk. She added that there
would be no guest parking spaces available for others to park when visiting these new
units.
• Dave Illar (2020 Long Bend Drive):
Mr. Illar, resident at Marsh Walk Villas, expressed concerns for the proposed driveway
adjacent to the tennis courts. He stated that this is a blind curve on Long Bend Drive
with limited site distance s and will create a dangerous access point for ingress and
egress to the new development.
• Clayton Shedrow (2783 Live Oak Villas):
Mr. Shedrow, a member of the Seabrook Island Greenspace Conservancy,
commented on the stormwater revetment pond that has bee n naturalized into
wetlands. He asked what the applicants would do to with the stormwater runoff from
the development if they are not able to restore the stormwater pond. He also
commented on how this project would have an adverse environmental effect on the
island.
• Jack Faught (1801 Long Bend Drive):
Mr. Faught, a resident at Heron Point Villas, expressed concerns similar to Ms.
Lenhart’s testimony with regards to setback requirements. He also commented on
how this will be a high -density project, that the applicants cannot guarantee these
will not be rental properties, and how the general membership of the Seabrook Island
Club would not be in favor of this project.
Chairman Sewell then asked if there were any other comments about the pending variance
request.
• Katrina Burrell (Seabrook Island Property Owners Association (SIPOA):
Ms. Burrell provided clarification for the Board regarding some of the previous
comments about communications between the applicants and SIPOA. She stated that
there had been discussions between the ARC and the applicants about ARC review
procedures, but that nothing has actually been reviewed or approved.
Ms. Burrell also clarified discussions between the applicant and SIPOA for access on
Long Bend Drive and the process for ingress and egress to the proposed development.
There being no further comments, Chairman Sewell closed the public hearing.
Chairman Sewell asked the applicants if they wished to make any additional comments.
Mr. Murphy offered clarification on a couple points. Regarding access to Long Bend Drive, he
stated that all properties must to have access to a road without relying on a neighboring
property owner; the entrance on Long Bend is intended to serve as that access point. The
guest parking spaces at Marsh Walk are actually on the subject parcel and not on the Marsh
Walk property. The stormwater pond was never a natural wetland; it was a manmade feature
that was naturalized only due to a lack of maintenance. Lastly, their plan was designed based
on the fact that two prior plans had been approved for this property; to say the applicants
“should have known” is a misguided statement.
Zoning Administrator Cronin asked if he could request clarification from the applicant on two
statements. The applicant stated that all properties must be guaranteed access to a road. He
asked whether this was something stated in SIPOA’s governing docum ents. Mr. Murphy
responded that he was referencing that you couldn’t have a parcel of land without access to
a public or private street. Zoning Administrator Cronin responded that this was certainly true
for a public street, but he was not aware of such a requirement for a private street. He asked
Ms. Burrell if she could confirm the applicant’s statement as it relates to SIPOA’s
requirements. Ms. Burrell responded that she wasn’t aware of anything that discusses that in
any way.
Zoning Administrator Croni n then noted that the applicant stated two prior development
plans had been approved for this property. He asked if the applicants could provide more
information on prior plans to develop the property which had gone all the way through the
approval process. Mr. Olsen stated that it had been portrayed to the buyers that development
plans had been approved in the past. Zoning Administrator Cronin responded that he was
aware of the original 1984 plan for Marsh Walk which showed a future second phase which
was never permitted or built, as well as a second attempt to develop the property in 2007 -
08, which also which never received final approval or permitting from the town; however, he
stated that he was not aware of any other requests which had actually been approved by the
town. To say that either plan was “approved” would not be accurate.
Chairman Sewell then called on Zoning Administrator Cronin to review the four criteria under
state law which must be used by the Board when hearing and deciding variance requests.
Zoning Administrator Cronin stated that the Board has the power to hear and decide appeals
for variance from the requirements of the zoning ordinance when strict application of the
provisions of the ordinance would result in unnecessary hardship. A variance may be granted
in an individual case of unnecessary hardship if the Board makes and explains in writing the
following findings:
(1) There are extraordinary and exceptional conditions pertaining to the particular piece
of property;
(2) These conditions do not generally apply to other property in the vicinity;
(3) Because of these conditions, the application of the ordinance to the particular piece
of property would effectively prohibit or unreasonably restrict the utilization of the
property; and
(4) The auth orization of a variance will not be of substantial detriment to adjacent
property or to the public good, and the character of the district will not be harmed by
the granting of the variance.
Chairman Sewell noted that, in granting a variance, the Board has the authority to attach such
conditions as the Board may consider advisable to protect established property values in the
surrounding area or to promote the public health, safety, or general welfare. Referencing the
staff write up contained within the ag enda packet, Chairman Sewell stated that the Zoning
Administrator had recommended attaching three conditions, should the Board vote to
approve the variance request. Chairman Sewell offered two additional conditions related to
drainage should the Board vote to approve the variance request.
Chairman Sewell opened the floor for discussion.
Ms. Gorski suggested that the Board take up the variance requests one at a time. She
suggested beginning discussion with the request to eliminate the 50 -foot buffer. She stated
that a 50 -foot buffer seemed like a huge distance to start off with, especially given the
irregular shape of the lot. She added that it seemed bizarre to have a 50 -foot buffer around
the tennis court.
Mr. Fox expressed his concern that the applicants were proposing essentially no buffer. He
stated that the applicants made assurances that they would install plantings, but they have
not provided any plans or details. He added that the applicants weren’t asking for relief from
the buffer; they wanted it to be done away with completely. He said it looked like the
applicants were just trying to cram as many units on the property as they could and expressed
concern with the lack of guest parking, among other items. He said he would support relief,
but not elimination of the buffer. He added that whether they can get 12 units or 4 units
depends on what the property is worth, and that’s not the concern of the Board. He also
referenced other property owners with similar site constraints going out of their way to meet
the town’s requirements and then asking for minimal relief only when necessary. He said he
felt that this applicant has not done that in this case.
Mr. Fox made a motion to deny the variance request. There was no second to the motion and
discussion continued.
Mr. Leggett stated that the applicant was trying to cram too many units onto a small parcel.
He added that he didn’t want to count on the applicant being able to reclaim the lagoon area
and would need additional information regardi ng the feasibility of those plans before being
comfortable supporting the request.
Mr. Fox stated that it didn’t appear to him that the applicant had made any effort to work
around the town’s buffer requirements and instead sought a variance to reduce or eliminate
these requirements. He stated that he would be open to meeting the applicants halfway if
they made some sort of effort.
Ms. Gorski stated that she appreciates that the odd shape of the property creates issues, but
she agreed with the concerns expressed by Mr. Fox and Mr. Leggett.
There being no further discussion, Chairman Sewell called for a motion.
Following a thorough review of the application, including all supporting materials received in
advance of the meeting, and all testimony received during the public hearing, Mr. Fox made
a motion to accept that the request meets the four criteria established by state law and,
therefore, to approve the following variance request:
a. The required 25-foot marsh setback, as specified by Sec. 7.60.50 of the DSO, is
hereby reduced to 10 feet (15-foot encroachment) to allow for construction of
a driveway and vehicular parking area;
b. The required 25-foot marsh setback, as specified by Sec. 7.60.50 of the DSO, is
hereby reduced to 18 feet (7-foot encroachment) to allow for construction of an
attached multi-family residence (“Unit 8”);
c. The required 15-foot marsh setback for open decks, as specified by Sec. 7.60.50
of the DSO, is hereby reduced to 8 feet (7 -foot encroachment) to allow for the
encroachment of an open deck (“Unit 8”);
d. The marsh area requirements specified by Sec. 9.40.10 of the DSO, are hereby
modified for portions of the development where one or more variances have
been authorized so as to exempt those areas from the requiremen t to retain
natural ground cover, or to plant and maintain such areas with grass or similar
groundcover, when such areas are located within twenty -five (25) feet of
wetlands, marsh or typical marsh vegetation as determined by SCDHEC -OCRM;
and
e. The 50-foot landscaped buffer along the shared property line with TM # 149-01-
00-093 (Seabrook Island Racquet Club tennis courts), as required by Sec. 10.30
of the DSO, is hereby eliminated.
The motion was seconded by Ms. Gorski.
There being no further discussion on the motion, Chairman Sewell called for a vote. Chairman
Sewell reminded members that a “yes” vote was a determination that the request meets the
four criteria and, therefore, in favor of approving the variance, while a “no” vote would be
opposed to approving the variance.
IN FAVOR (YES) OPPOSED (NO)
Chairman Sewell
Mr. Fox
Ms. Gorski
Mr. Leggett
The motion to grant the variance was DENIED.
ITEMS FOR INFORMATION / DISCUSSION
There were no Items for Information / Discussion
There being no further business, Mr. Leggett made a motion to adjourn the meeting. M r. Fox
seconded the motion. The motion was APPROVED by a vote of 4-0 and the meeting was adjourned
at 5:48 PM.
Minutes Approved: 08/20/2021 Joseph M. Cronin
Zoning Administrator