TOWN OF SEABROOK ISLAND
Board of Zoning Appeals Meeting
January 29, 2019 – 2:30 PM
Town Hall, Council Chambers
2001 Seabrook Island Road
MINUTES
Present: Walter Sewell (Chairman), Ava Kleinman (Vice Chair), Bob Leggett, John Fox, Richard
Finkelstein, Joe Cronin (Zoning Administrator) , Lynda Stearns (License & Permit
Specialist)
Absent: None
Guests: Jean Jones , Tommy B erl, Clint Galloway, Bennett Galloway, Raymond Hamilton,
Stephanie Hamilton, Katrina Burrell (SIPOA), Stephen Atkinson, Bill Bane
Chairman Sewell called the meeting of the Board of Zoning Appeals to order at 2:30 PM and
introduced himself and Board members Kleinman, Fox and Leggett to those in attendance. Zoning
Administrator Cronin confirmed that the requirements of the Freedom of Information Act were
fulfilled, and the meeting was properly posted.
APPROVAL OF MINUTES
1. Board of Zoning Appeals Meeting: April 25, 2018 : Ms. Kleinman made a motion to approve
the minutes from the January 18, 2019, meeting as submitted. Mr. Fox seconded the motion.
The motion was APPROVED by a vote of 4-0.
Mr. Finkelstein arrived at 2:35 pm.
PUBLIC HEARING ITEMS
1. 2633 Jenkins Point Road (Tax Map # 149-00-00-046 – Lot 34, Block 52): Chairman Sewell
introduced the first variance request , which was submitted by John C. Butera and Jean W.
Jones, the owners of 2633 Jenkins Point Road, as well as their contractor, Tommy B erl of
Surfside Construction. Chairman Sewell disclosed for the record that the Board had
conducted a site visit to 2633 Jenkins Point Road on January 18, 2019, at which time the Board
viewed the subject property, as well as neighboring properties. He added that no testimony
was received during the site visit. He asked whether any Board members had subsequently
visited the property, to which none responded in the affirmative.
Chairman Sewell then administered an oath to Zoning Administrator Cronin and asked him to
provide a brief overview of Variance Application #157.
Zoning Administrator Cronin stated that the town had received a completed variance
application from John C. Butera and Jean W. Jones, the owners of 2633 Jenkins Point Road,
as well as their contractor, Tommy B erl of Surfside Construction . The applicants were
requesting a reduction in the 25 -foot marsh setback requirement to allow construction of a
pervious pergola system over an existing deck at the rear of a single-family residence located
at 2633 Jenkins Point Road (Lot 34, Block 52).
Zoning Administrator Cronin stated that there is a circular roof coverin g a portion of the
existing deck at the rear of the home. The existing roof, which covers an outdoor kitchen area,
encroaches approximately 6.5 feet into the 25-foot marsh setback. He noted that the existing
roof was conforming at the time of its construction in 2007-08. The roof was only made non-
conforming by subsequent changes to the marsh critical line over the last 10 years.
Zoning Administrator Cronin stated that the applicants were proposing to remove the existing
circular roof and to replace it with a pervious pergola system that will cover the entire deck,
including portions which are currently uncovered. He stated that he had previously denied a
zoning permit in October 2018 due to the fact that the pergola would constitute a “roof or
covering of any kind,” thereby converting the existing “pervious deck” (which requires a 15 -
foot marsh setback) into a “covered porch” (which requires a 25 -foot marsh setback). The
Zoning Administrator also determined that while the existing non -conforming roof may be
repaired and maintained, its removal and replacement with another non -conforming
structure would require a variance from the Board of Zoning Appeals. The applicants filed an
appeal of the Zoning Administrator’s decision on October 9, 2018. The Board considered the
appeal on November 8, 2018, at which time the Board voted to uphold the Zoning
Administrator’s decision. At that time, the applicants were advised that they may resubmit
the request for consideration as a variance.
Zoning Administrator Cronin explained that while a majority of the new pergola structure will
meet the 25 -foot marsh setback requirement, portions of the structure will encroach, at
most, 7 feet into the required setb ack. The proposed pergola will not increase the extent of
non-conformity in the area where the existing roof is present; however, one small corner of
the deck, if allowed to be covered, would encroach approximately 2 -3 feet into the 25 -foot
marsh setback. With the exception of the aforementioned non-conforming roof, the existing
home meets all other requirements of the town’s DSO:
In order to allow removal of the existing roof and replacement with a pervious pergola
system, the applicants sought approval of a variance to grant relief from the following setback
requirements, as provided in the town’s DSO:
Type DSO
Reference
DSO
Requirement
Variance
Requested
Marsh
(Principal Structure) § 7.60.50 25 feet
Allow encroachment of up to 7
feet where the existing roof is
located and up to 3 feet where
the non-conforming roof will
be expanded
In their application, the applicants stated their intent in seeking a variance was to be able to
use and enjoy their outdoor deck. The applicants argued that replacing the existing solid roof
with a pervious pergola system would allow water to flow through the deck to the ground
below, which is more in line with the intent of the marsh setback requirement.
Chairman Sewell then called on the applicants to provide additional information related to
their variance request. Chairman Sewell administered an oath to each individual prior to their
testimony.
• Tommy Berl: Mr. Berl of Surfside Construction spoke on behalf of the applicants. He
stated that he primary purpose of the pergola system was to provide shade over the
existing deck and make it more usable to the occupants, especially Mr. Butera, who
suffers from a serious medical condition and is unable to spend long periods of time
exposed to the sun and heat. He added that the existing roof also destroys the view
of the marsh from inside the home. He explained that the existing roof conformed to
the marsh setback at the time it was built and was only made non -conforming by
subsequent changes to the location of the critical line. He stated that the proposed
pergola was an open, permeable system that would allow water to return to the
surface, thereby making it more compliant with the zoning ordinance than the
existing non-conforming roof, which was proposed to be removed. Lastly, he said that
strict application of the ordinance to th is p roperty would effectively prohibit or
unreasonably restrict the owners’ use and enjoyment of their deck.
Chairman Sewell asked if members of the Board had any questions for Mr. Berl.
Ms. Kleinman asked for clarification as to what portion of the pergola was the subject of the
variance request. Mr. Berl noted that most of the pergola was to be located outside the 25 -
foot setback line, and that only the portion of the deck which was already covered, as well as
one small corner, were the subject of the request. Ms. Kleinman asked if the pergola was
intended to replace the existing gazebo, in which case it was not necessarily a “new”
encroachment. Mr. Berl responded in the affirmative. Ms. Kleinman asked what was
“extraordinary” about the corner section that would be newly covered by the pergola. Mr.
Berl responded that it wasn’t necessarily extraordinary, but that it would be impractical to
mount the roof supports anywhere other than at the corners of the deck. By extending the
pergola out to the corner, the applicants would have a logical place to install a support beam
and would not lose any usable space on their existing deck. He added that the supports would
be mounted on the existing deck rather than on the ground, and that the overall footprint of
the deck would not be expanded. Ms. Kleinman as ked if this situation applied to any other
property in the vicinity. Mr. Berl responded that other homes in the vicinity were pulled
further back from the marsh. He added that he was not aware of any other homes which
faced a similar situation. Ms. Kleinman stated that while the new encroachment at the corner
of the deck would not “effectively prohibit” the use of the property, it did appear that it would
impact the owners’ ability to use and enjoy their outdoor kitchen area by impacting the
location of the support posts. Lastly, Ms. Kleinman asked if the granting of a variance would
be a detriment to neighboring property owners. Mr. Berl responded that the pergola would
not be visible from the road or from neighboring properties , and that no houses would ev er
be built in the marsh behind the property. He added that the pergola system would be made
of aircraft quality aluminum and painted to match the existing trim color of the house. It was
the homeowners’ intent that the pergola would “disappear” when viewed from a distance.
Chairman Sewell asked if any other Board members had questions for the applicant. There
were no additional questions.
Zoning Administrator Cronin noted that there was one additional public comment received in
advance of the meeting. He requested consent for the letter from Mrs. Maritza Doak in
support of the variance request to be entered into the public record. There was no objection.
Chairman Sewell opened the public hearing to individuals who wished to speak in favor of the
variance request. Chairman Sewell administered an oath to each individual prior to receiving
their testimony.
• Terrell Bowers: Mr. Bowers stated that he was about to close on the purchase of 1307
Jenkins Lagoon S, which is two houses down from the subject property. Mr. Bowers
stated that he was in favor of the request because the pergola would be located over
an existing deck and would result in the replacement of an impervious roof with a
pervious structure. He stated that the covering would not be visible from the road or
from his property. Therefore, he had no objection to the granting of the variance.
Chairman Sewell then opened the public hearing to individual s who wished to speak in
opposition to the variance request. No one spoke in opposition to the request.
There being no further comments, Chairman Sewell closed the public hearing.
Chairman Sewell asked if the applicants or their representatives had any additional
comments. No additional comments were offered.
Chairman Sewell asked members of the Board whether they had any additional questions.
There were no additional questions.
Chairman Sewell then called on Zoning Administrator Cronin to review the four criteria under
state law which must be used by the Board when hearing and deciding variance requests.
Zoning Administrator Cronin stated that the Board has the power to hear and decide appeals
for variance from the requirements of the zoning ordinance when strict application of the
provisions of the ordinance would result in unnecessary hardship. A variance may be granted
in an individual case of unnecessary hardship if the Board makes and explains in writing the
following findings:
1) There are extraordinary and exceptional conditions pertaining to the particular piece
of property;
2) These conditions do not generally apply to other property in the vicinity;
3) Because of these conditions, the application of the ordinance to the particular piece
of property would effectively prohibit or unreasonably restrict the utilization of the
property; and
4) The authorization of a variance will not be o f substantial detriment to adjacent
property or to the public good, and the character of the district will not be harmed by
the granting of the variance.
Chairman Sewell noted that, in granting a variance, the Board has the authority to attach such
conditions as the Board may consider advisable to protect established property values in the
surrounding area or to promote the public health, safety, or general welfare. Referencing the
staff write up contained within the agenda packet, Chairman Sewell stated t hat the Zoning
Administrator had recommended the following conditions, should the Board vote to approve
the variance request:
1) The approved variance shall apply to the building layout as shown on the site-specific
plan prepared by the applicants and reviewed by the Board on January 29, 2019. Any
modification to this site-specific plan prior to the issuance of a zoning permit, with the
exception of minor corrections and/or modifications which conform to the
requirements of the town’s DSO, shall require furth er review and approval by the
Board of Zoning Appeals prior to permitting.
2) The approved variance shall expire on November 2, 2019 (five years from the date of
the current OCRM Critical Line Survey) if no zoning permit has been issued by the
town on or before that date.
There being no further discussion, Chairman Sewell called for a motion.
Following a thorough review of the application, including all supporting materials received in
advance of the meeting, and all testimony received during the public hearing, Ms. Kleinman
made the following motion, which was seconded by Mr. Finkelstein:
1) The Board finds that strict application of the Town’s DSO WOULD result in an
unnecessary hardship;
2) For the reasons referenced in the Applicants’ request for variance, the Board finds
that the Property MEETS the criteria for approval of a variance, as outlined in § 6-29-
800(A)(2) of the SC Code of Laws; and
3) The requested variance is APPROVED, and the marsh setback requirement for the
Property is hereby amended, as follows:
Type DSO
Requirement
Variance
APPROVED
Marsh Setback
(Covered Porch) 25 feet Reduce the 25-foot marsh setback by up to 7
feet to allow for removal of an existing non-
conforming roof (impervious) and
replacement with a pervious pergola system
Mr. Leggett recommended that the motion be amended to include the two conditions
recommended by the Zoning Administrator. Ms. Kleinman amended her motion to include
the two conditions recommended by the Zoning Administrator, as follows:
To protect established property values in the surrounding area, and to promote the public
health, safety, and general welfare , the motion to approve the variance contained the
following conditions, as allowed by § 6-29-800(A)(2)(d)(i) of the South Carolina Code of
Laws:
1) The approved variance shall apply to the building layout as shown on the site -
specific plan prepared by the applicants and reviewed by the Board on January
29, 2019. Any modification to this site -specific plan prior to the issuance of a
zoning permit, with the exceptio n of minor corrections and/or modifications
which conform to the requirements of the town’s DSO, shall require further
review and approval by the Board of Zoning Appeals prior to permitting.
2) The approved variance shall expire on November 2, 2019 (five years from the date
of the current OCRM Critical Line Survey) if no zoning permit has been issued by
the town on or before that date.
Mr. Finkelstein accepted the amendment. There being no further discussion on the motion,
Chairman Sewell called for a vote. Chairman Sewell reminded members that a “yes” vote was
in favor of granting the variance, while a “no” vote was opposed to granting the variance.
IN FAVOR (YES) OPPOSED (NO)
Ms. Kleinman
Mr. Leggett
Mr. Fox
Mr. Finkelstein
Chairman Sewell
The motion to grant the variance, with conditions, was APPROVED by a vote of 4-1.
The meeting was recessed at 3:09 PM.
The meeting was reconvened at 3:15 PM.
2. 2959 Seabrook Island Road (Tax Map # 149-10-00-036 – Lot 12-B, Block 42): Chairman Sewell
introduced the second variance request, which was submitted by Stephanie and Raymond
Hamilton, the owners of 2959 Seabrook Island Road, as well as their homebuilder, Bennett
Galloway and Clint Galloway of Galloway Family Homes. Chairman Sewell disclosed for the
record that the Board had conducted a site visit to 2959 Seabrook Island Road on January 18,
2019, at which time the Board viewed the subject property, as well as neighboring properties.
He added that no testimony was received during the site visit. He asked if any Board members
had subsequently visited the property, to which none responded in the affirmative.
Chairman Sewell then called on Zoning Administrator Cronin and asked him to provide a brief
overview of Variance Application #158. He reminded Zoning Administrator Cronin that he was
still under oath.
Zoning Administrator Cronin stated that the town had received a completed variance
application from Stephanie and Raymond Hamilton , the owners of 2959 Seabrook Island
Road, as well as their homebuilder, Bennett Galloway and Clint Galloway of Galloway Family
Homes. The applicants were requesting a variance to exceed the 36 -foot maximum height
requirement for a new single -family home which was currently under construction at 2959
Seabrook Island Road (Lot 12-B, Block 42).
Zoning Administrator Cronin stated that the property owners had contracted with Galloway
Family Homes for construction of a new single -family residence on their property. Galloway
applied for and obtained a zoning permit (Permit #14595) from the Town of Seabrook Island
on March 16, 2018. A building permit was subsequently obtained from Charleston County,
and construction of the new residence began in the spring of 2018.
Zoning Administrator Cronin stated that at the time a zoning permit was issued by the town,
the applicant received a list of the town’s construction requirements. Among those was a
requirement to provide a variety of surveys – including a preliminary elevation certificate,
foundation survey and certification of height – during the construction process. The applicant
signed an acknowledgement page indicating that they had received this information and were
aware of these obligations.
Zoning Administrator Cronin stated that the town’s License and Permit Specialist, Ms. Lynda
Stearns, had sent a letter to Galloway on October 30, 2018 notifying them that the town had
not received a preliminary elevation certification or foundation survey, despite the fact that
framing had begun on the house. After more than 30 days of non-response, a stop work order
was placed on the property.
On or around December 22, 2018, Galloway submitted to the town’s Zoning Administrator a
certification of height form, which was prepared by Lauren Maurice Wilder, a Professional
Land Surveyor in the State of South Carolina, and dated December 6, 2018 . Upon review, it
was determined by the Zoning Administrator that the height of the residence, which was still
under construction, exceeded the maximum height requirement as established by § 7.90.20
of the town’s Development Standards Ordinance. The maximum height allowed by the DSO
is 36 feet above the base flood elevation (hereafter, the “BFE”) plus 2 -foot freeboard
requirement, or similarly, 38 feet above the BFE. The Certification of Height identified t he
total height of the structure as 39.2 feet above the BFE, or 1.2 feet higher than the maximum
height allowed by the DSO. Zoning Administrator Cronin stated that he advised Galloway that
they would need to modify the structure to meet the maximum height requirement or seek
a height variance from the Board.
In their variance application, the applicants sought approval from the Board to grant relief
from the following zoning requirement:
Type DSO
Reference
DSO
Requirement
Variance
Requested
Maximum Height § 7.90.20
36’ above BFE
+ 2’ FB
(38’ above BFE)
Increase the maximum
height requirement by up to
1.2 feet (39.2’ above BFE)
As part of their variance request, the applicants stated that strict application of the maximum
height requirement would result in an unnecessary hardship. The applicants further argued:
1) The Architectural Review Committee (ARC) of the Seabrook Island Property Owners’
Association requested that the finished gra de of the lot be increased to aid in
stormwater runoff, and that this request contributed to the structure’s non -
conforming height;
2) Further, a building error in the field by a previous foreman was not discovered and
made known to the applicants until the house was fully framed and the roof was
installed;
3) Modifying the pitch of the roof to conform with the maximum height requirement
would result in a structure which looks out of character with other homes in the
vicinity; and
4) The actual front yard setback of the residence (approximately 57 feet) significantly
exceeds the 30-foot front yard setback required by the town’s DSO.
Zoning Administrator Cronin noted that there were no other non-conformities, except for the
building height. He added that if the Board votes to approve the variance request, then staff
would recommend in favor of attaching the following conditions:
1) The approved variance shall apply to the building elevation as p resented by the
applicant and reviewed by the Board on January 29, 2019. Any modification to this
building elevation prior to the issuance of an amended zoning permit and/or
certificate of occupancy, with the exception of minor corrections and/or
modifications which conform to the requirements of the town’s DSO, shall require
further review and approval by the Board of Zoning Appeals.
2) If the existing building permit for 2959 Seabrook Island Road expires prior to the
issuance of a Certificate of Occupancy, or prior to the granting of an extension
pursuant to § 7.90.20 of the DSO, a variance authorizing the structure to exceed the
maximum height shall terminate upon expiration of the existing building permit.
Chairman Sewell noted that one height certificate provided by the applicant indicated that
the building height was 1.2 feet higher that what was allowed, whereas a subsequent survey
identified the structure as 0.96 foot above the maximum height. He asked whether the
variance request was for 1.2 feet or 0.96 feet. Zoning Administrator Cronin noted that it was
not uncommon to have minor variation among surveyors , but that both surveys did in fact
exceed the maximum height requirement . He recommended that the Board consider the
request to exceed the maximum height by “up to 1.2 feet” to account for the variation
between the two surveys.
Chairman Sewell called upon License and Permit Specialist Stearns to provide testimony to
the Board. Chairman Sewell then administered an oath to Ms. Stearns.
Chairman Sewell asked Ms. Stearns when the elevation documentation is typically provided
by a builder. Ms. Stearns responded that the preliminary elevation and foundation surveys
are required to be provided before the builder begins framing the house. Chairman Sewell
asked Ms. Stearns, based on her experience, when she wo uld have reasonably expected to
receive these documents. Ms. Stearns responded that assuming the county issued a building
permit in May, the paperwork would typically have been submitted around July.
Mr. Finkelstein asked if the builder acknowledged that the structure exceeded the maximum
height when the surveys were submitted. Ms. Stearns responded that all of the surveys were
received at the same time. Mr. Finkelstein asked if it was typical for a builder to submit all
surveys at the same time. Ms. Stearns responded that this was unusual, as the preliminary
elevation and foundation surveys are required prior to framing, whereas the certification of
height is not completed until the building is fully framed and the roof is topped out.
Mr. Fox asked whether the purpose of the foundation survey is to determine whether the
location of the building meets all of the town’s setback requirements. Ms. Stearns responded
in the affirmative. He then asked whether the preliminary elevation is measured based on the
ground floor elevation or the first floor. Ms. Stearns responded that the purpose of this survey
is to determine the elevation of the first floor. Mr. Fox asked whether the purpose of the
preliminary elevation is to determine whet her the first floor is too low or too high, and to
make any corrections at that time prior to framing the house. Ms. Stearns responded in the
affirmative. Mr. Fox also asked whether the roof is supposed to be installed prior to
measuring the height of the ridge. Ms. Stearns responded that the contractor is required to
provide a certification of height prior to installing the roof sheathing. She added that she had
previously created a “cheat sheet” to inform builders of what surve ys are required to be
provided at what time during the construction process. This sheet is provided to all builders
when they pick up their permit. Each contractor also signs an acknowledgement that they
have received and understand these requirements. Mr. Fox asked whether this issue could
have been avoided if the contractor had followed the town’s procedure. Ms. Stearns
responded in the affirmative.
There being no further questions for Ms. Stearns, Chairman Sewell then called on the
applicants to provide additional information related to their variance request. Chairman
Sewell administered an oath to each individual prior to receiving their testimony.
• Raymond Hamilton: Mr. Hamilton introduced himself as the owner of 2959 Seabrook
Island Road , along with his wife Stephanie, who was also in attendance. He also
introduced his homebuilders, Bennett and Clint Galloway of Galloway Family Homs.
Mr. Hamilton t hanked the Board for the opportunity to present their request. He
stated that he understands the importance of the town’s ordinances, adding that the
beauty and quality of development on the island was what attracted them to
Seabrook. He added that this structure will become their permanent residence once
it is completed . He stated that the final height of the building was the result of a
mistake in the field, which resulted in the building being somewhere between 11 and
14 inches to tall. He offered an apology to the Board and stated that he was not aware
of the issue until it was brought to his attention in December. He explained that two
changes requested by the SIPOA AR C contributed to the problem: increasing the
height of the building pad to aid water runoff toward the lagoon rather than Seabrook
Island Road and increasing the pitch of the roof . He stated that the owners
accommodated all of the ARC’s requests, which raised the total height of structure.
He stated that he and his wife wa nt to be good neighbor s and fit in with the
community but added that they would like to complete construction and move in as
soon as possible. He stated that no construction has taken place in last month and a
half and questioned what could be done at this point. He explained that removing and
adjusting the roof to lower its pitch would be a hardship due to the cost and time
involved. He a sked the B oard to grant the variance so that construction may be
completed in a timely manner.
• Clint Galloway: Mr. Clint Galloway stated that he thought the height survey was not
required until prior to the issuance of a certificate of occupancy. Zoning Administrator
Cronin clarified that the town ’s ordinance requires a certification of height be
provided prior to the installation of the roof sheathing. Mr. Galloway stated that as
soon as they found out that the building exceeded the maximum height requirement,
they began looking at options to address the issue. It was determined that a variance
request was the best option. Mr. Galloway stated that his company has built over 750
homes and has never been in a situation where they had to ask for a variance, so this
was a new process to him . He stated that the builder h ad some personnel issues
during constru ction of the foundation which contributed to the error . He
acknowledged that there was an issue and that they were accountable for addressing
it. He stated that the building was only 11 inches too tall, and they were hopeful that
they could obtain relief f rom the Board. He explained that the front gable (which is
the one visible from the street) was actually under the maximum height; whereas the
gable in the rear exceeded the maximum height. He added that construction stopped
in December and the house has been sitting pending the outcome of today’s hearing.
Mr. Leggett asked how the building pad ended up being one foot too high. Mr. Galloway
responded that there was some confusion as to the height required to achieve adequate
flow to the lagoon. He also stated that there was a change in personnel during the
foundation stage, adding that that the builder was not aware that the foundation was too
tall until after the survey was completed later in the construction process. Mr. Galloway
stated that there were multiple factors that contributed to the building being about a foot
too tall.
Mr. Fox noted that the original plan showed the building, even with the raised pad, would
still be a couple inches below the maximum height. He asked how the builder knew they
were going to make it. He also asked if the builder had surveyed the finished elevation
prior to constructing the foundation . Mr. Galloway responded that there was a marked
point in the field that was used to determine the height of the pad. Mr. Galloway added
that the foundation blocks were also higher than what was shown on the plan. Mr. Fox
stated that if the builder had checked the elevation at each step, they would have known
that they were falling out of line with the plans.
• Bennett Galloway: Mr. Bennet Galloway, also of Galloway Family Homes, then spoke
on behalf of the applicants. Mr. Galloway stated that the plans were not followed by
the superintendent on the job site. He added that this wasn’t known until later on in
the construction process, which is 100% the builder’s fault. He said that it was never
their intent to create a $100,000 problem and then ask for forgiveness. He stated that
the foundation was not completed until the end of September , rather than the July
date which was referenced earlier . He stated that the foundation work and framing
were completed quickly. The roof was completed, and the shingles were subsequently
installed three days later. He added that the surveys were all completed right around
the same time. He said it was also the builder’s fault for not having the information
on what was required to be provided to the town during the construction process.
Ms. Kleinman asked Mr. Bennett Galloway whether the builder was aware that the ordinance
required a foundation survey to be filed prior to framing the house. Mr. Galloway stated that
they were not aware until they received the stop work order from the town. She asked if the
builder was aware that a certification of height was required prior to installing the sheathing
on the roof. Mr. Galloway responded that he was not aware that they could not install the
roofing materials on top of the trusses at that point. Ms. Kleinman asked what construction
took place between the time the letter was sent from the town on October 30th and the date
the stop work order was issued. Mr. Galloway responded that once the builder found out
there was an issue, they had stopped construction on the property.
Mr. Fox asked who signed the acknowledgement sheet on behalf of the builder at the time
the permit was issued. Mr. Fox stated for the record that the builder was in fact made aware
of the town’s surveying requirements and procedures and signed an acknowledgement
stating as such. Mr. Galloway stated that they were in fact made aware of the requirements
for building here in Seabrook.
Chairman Sewell asked if any other Board members had additional questions for the
applicant. There were no additional questions.
Chairman Sewell th en asked Katrina Burrell, ARC Administrator for the SIPOA , to come
forward to the podium. Chairman Sewell administered an oath to Ms. Burrell. Chairman
Sewell stated that he requested Ms. Burrell to attend the meeting because the applicants
claimed that the ARC’s requirements contributed to the building exceeding the maximum
height. Ms. Burrell stated that the ARC did request an increase to the building pad to improve
storm drainage, as well as an increase to the roof pitch. However, she added that these
modifications were discussed prior to submission of the final building plans. She added that
these changes were incorporated into the final plans and were subsequently approved by
both the ARC and the town. Chairman Sewell asked if the ARC had any further role in the
process once the plans were approved. Ms. Burrell responded that the ARC did not have any
further role after the plans were approved. Chairman Sewell asked if any other members had
questions for Ms. Burrell. There were no additional questions.
Chairman Sewell opened the public hearing to individuals who wished to speak in favor of the
variance request. No one spoke in favor of the request.
Chairman Sewell opened the public hearing to individuals who wished to speak in opposition
to the variance request. No one spoke in opposition to the request.
Chairman Sewell then asked if there were any additional public comments regarding the
variance request. Chairman Sewell administered an oath to each individual prior to receiving
their testimony.
• Stephen Atkinson: Mr. Atkinson stated that he had recently purchased property at
3712 Seabrook Island Road. He stated that approval of this request could affect him
in the future. He asked whether anyone has ever come before the board seeking a
height variance. Zoning Administrator Cronin responded that as far back as the town’s
electronic records go, he has not found any such instances; however, there may have
been similar requests in the past. Mr. Atkinson stated that the responsibility for
correcting the error should rest with the builder. He stated that while he didn’t really
care whether the variance was approved or not, he worried about the precedent that
this decision could establish for future cases. He added that if a similar variance were
ever approved near his property, it would likely block his views of the ocean. He
reiterated that his primary concern is the precedent that this decision could set.
There being no further comments, Chairman Sewell closed the public hearing.
Chairman Sewell asked if the applicants or their representatives had any additional
comments. Mr. Hamilton stated that he and his wife came from Atlanta and have never gone
through the ARC process. He s tated that they were advised early on that if the ARC
recommended something, they needed to include it in their plans. He stated that several of
the plan changes were incorporated at the ARC’s request, adding that these changes were
not viewed as suggestions, but as requirements. He also stated that these changes were made
at a significant cost of time and money. He again asked for lenience from the Board.
Mr. Clint Galloway asked if there was an option whereby the applicant could pay a fine and
continue with construction. Zoning Administrator Cronin responded that the penalty for non-
compliance would be the withholding of a certificate of occupancy, as well as fines of up to
$500 per day for each day the violation continues to occur.
Mr. Bill Bane asked if he could speak regarding the request. Chairman Sewell administered an
oath to Mr. Bane prior to receiving his testimony.
• Bill Bane: Mr. Bane stated that he is currently the chairman of the ARC. He responded to
Mr. Hamilton’s comment by stating that any suggestions made by the ARC are intended
to improve the final build of a home. He stated that all such discussions are undertaken
prior to final plan approval. In this case, the house was not built according to the plans
which were reviewed and approved by the ARC or the town. He added that if the house
was built according to the approved plans, then it would have met the maximum height
requirement.
Chairman Sewell asked whether members of the Board had any additional questions. There
were no additional questions.
Chairman Sewell then called on Zoning Administrator Cronin to review the four criteria under
state law which must be used by the Board when hearing and deciding variance requests.
Zoning Administrator Cronin stated that the Board has the power to hear and decide appeals
for variance from the requirements of the zoning ordinance when strict application of the
provisions of the ordinance would result in unnecessary hardship. A variance may be granted
in an individual case of unnecessary hardship if the Board makes and explains in writing the
following findings:
1) There are extraordinary and exceptional conditions pertaining to the particular piece
of property;
2) These conditions do not generally apply to other property in the vicinity;
3) Because of these conditions, the application of the ordinance to the particular piece
of property would effectively prohibit or unreasonably restrict the utilization of the
property; and
4) The authorization of a variance will not be of substantial detriment to adjacent
property or to the public good, and the character of the district will not be harmed by
the granting of the variance.
There being no further discussion, Chairman Sewell called for a motion.
Following a thorough review of the application, including all supporting materials received in
advance of the meeting, and all tes timony received during the public hearing, Ms. Kleinman
made a motion to vote on whether to approve or deny the variance request. The motion was
seconded by Mr. Fox.
There being no further discussion on the motion, Chairman Sewell called for a vote. Chairman
Sewell reminded members that a “yes” vote was in favor of granting the variance, while a
“no” vote was opposed to granting the variance.
IN FAVOR (YES) OPPOSED (NO)
Chairman Sewell
Ms. Kleinman
Mr. Leggett
Mr. Fox
Mr. Finkelstein
The motion to grant the variance was DENIED by a vote of 0-5.
In denying the variance, the Board made the following findings:
1) There are NOT extraordinary and exceptional conditions pertaining to this particular
piece of property due to the fact that the basis for the variance request was a contractor
error during construction of the foundation, an error of which the applicants should
have been aware, and which should have been corrected in the field prior to framing
the house;
2) Any conditions applicable to this particular piece of property WOULD apply to all other
property in the vicinity, as the maximum height requirement applies to all single-family
zoned properties in the town limits;
3) The application of the maximum height requirement to this particular piece of property
would NOT effectively prohibit or unreasonably restrict the utilization of the property,
as the applicants testified that t he roof elevation shown on the approved plans was
intended to be lower than what was constructed and, had the designated agent built
the structure according to those plans, then a variance would not be required. Further,
the design of the existing structur e may be modified to conform to the Town’s
maximum height requirement without the necessity of a variance; and
4) The authorization of a variance WILL be of substantial detriment to adjacent property
and to the public good, as the granting of a variance due to a building error may be
considered as precedent for similar cases in the future. This would be especially
inappropriate in this case because the contractor failed to comply with on -going
construction approval requirements which would have led to early identification and
correction of the error.
ITEMS FOR INFORMATION / DISCUSSION
There were no Items for Information / Discussion.
There being no further business, Chairman Sewell called for a motion to adjourn. M r. Fox made a
motion, seconded by Ms. Kleinman, to adjourn the meeting. The motion was APPROVED by a vote of
5-0, and the meeting was adjourned at 4:17 PM.
Minutes Approved: February 28, 2019 Joseph M. Cronin
Zoning Administrator