Historic District Technical Review Committee (HTRC) / Pre-Design Meeting (Agenda Packet)
City of Beaufort · Beaufort County · meeting of Jul 23, 2025 · Agenda packets
Open the original document More from City of Beaufort
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
HTRC/PRE-DESIGN MEETING
AGENDA
Meeting – Wednesday, July 23, 2025
at 10:00 AM
This meeting will be held at 1911 Boundary Street (Beaufort City Hall) in the first-floor
Planning Conference room.
Please click the link below to join the webinar:
https://us02web.zoom.us/j/86706195142?pwd=jJ30InKNRWe0OUaFPABt6QIptxe8Cg.1
Password: 242241 Meeting ID: 867 0619 5142 Call in Phone#: +1 929 205 6099
Agenda items:
I. Projects:
a. 509 Harrington Street (Contributing; c. 1860) – Request for change of exterior
paint colors (siding, trims, porch decking, porch ceiling) on primary and guest
house; Submitted by Mark Rossi (Owner)
b. 1304 Washington Street (Non-contributing) – Request to add a tower to the front
elevation of the existing house; Submitted by Witt Cox (Owner)
II. Staff Discussion
III. Adjournment
If you have any questions, please call (843) 525-7014.
cc: Mark Rossi (Owner);
Witt Cox (Owner)
509 HARRINGTON STREET
Request for repainting of exterior of
main and guest houses
(Contributing; c. 1860)
1304 WASHINGTON STREET
Request for a tower addition to
existing single-family home
(Non-contributing)
CITY OF BEAUFORT
HTRC – Pre-Design Application Meeting
1911 BOUNDARY STREET
BEAUFORT, SOUTH CAROLINA 29902
(843) 525-7011 FAX: (843) 986-5606
Meeting Summary
Date: 1/15/2025
Project Address: 1304 Washington Street
Project Narrative: Request for heated living space addition at front portion & enclosure of back
porch at SF-residence
Applicant: Witt Cox
Synopsis of staff comments:
• Planning and zoning:
o T4-HN
o Noncontributing structure
o Section 3.11.2 – Accessory Uses
o Section 4.5.3 – Carriage House: compatibility with primary structure – colors,
siding, roofing materials, etc.
o Section 4.6.1 – Building Design Standards: size, massing, scale
o From previous HRB cases, justifying the front porch extension and 3
rd floor
addition will be difficult to get approved.
o OK with expanding the front office area, leaving the porch as-is, the additions to
the back are good
• Building Codes:
o 5 ft setback issue: lot corner to lot corner. Shouldn’t have an issue with that again.
o X flood zone. Contours are great. 21-23’ elevation.
o Concerned about 2nd floor addition. Windows will need to meet emergency egress
standards. Emergency egress: ch3.10
• Architecture:
o Staff is supportive of the porch #2 infill and conversion into a mudroom, as well
as addition of the walk-in closet at the rear of the structure.
o Staff is also supportive of the office addition at the front of the structure
o Staff does not support the proposal to have no porch at all on the front – front
porches are very typical for the Beaufort historic district and a character-defining
feature of this house
o Since the front setback requirement is the average prevailing setback, staff has
concerns that the addition at the front of the structure with a new porch interrupts
the average prevailing setback rhythm on the block – the front plane of the front
porch is in line with the other existing front porches
o Instead of introducing additions that disrupt the front façade and rhythm of the
streetscape, staff recommends pushing the dining room/playroom/office additions
to the side/rear of the structure.
• HBF:
o Concerns with changing the rhythm of the street front. Pulling forward beyond the
current house breaks the historic street pattern of the block. This pattern is a
character defining feature of the block. When the house was built, adherence to
the historic street pattern would have been a part of the reason the new
construction was approved.
Applicant’s Next Steps: Make revisions, come back to the HTRC for another round of review,
once everything is good to go, we will schedule a meeting with the HRB
Be advised that this letter is given as a courtesy to applicants and may not contain all project guidelines.
For a complete history of the meeting, please request the audio recording. Please refer to the Beaufort
Code for applicable sections. If there are any changes to the project, not discussed in this meeting, you
will need to return to a HTRC – Pre-Design meeting.
If you have any questions, feel free to call the Community Development Department at (843) 525-7014.
Thank you for your patience and cooperation during the review process.
Sincerely,
City of Beaufort Community Development
STAFF REPORT - HTRC / Pre-Design application
DATE: 07/23/2025
GENERAL INFORMATION
Applicant: Witt Cox (Homeowner)
Site Location/Address: 1304 Washington Street / TMP: R120 004 000 0352 0000
Applicant's Request: The applicant is wanting to expand heated living space by adding a tower
structure to the front of the existing building (built 2017).
Current Zoning: T4-HN
Located within the Historic
Beaufort District? If so,
contributing or non-contributing
structure?
Within Historic Beaufort District (Northwest Quadrant) /
Non-contributing
ZONING DISTRICT INFORMATION
T4-HN
Lot Width at Setback: 40 ft. min. / (60 ft. min in the Point)
Max Lot Coverage: 55%
Max. Frontage Build Out 75% of lot area
Front Setback Avg. setback on the block
Side Setback 6ft. interior, 5 ft at corner/ (10 ft. interior in the Point)
Rear Setback 15 ft min
Building Height: 3 stories max.
SURROUNDING ZONING, LAND USE AND REQUIRED BUFFERS
Adjacent Zoning Adjacent Land Uses Setbacks for Adjacent Zoning
/Buffer required if rezoned
North: T4-HN Historic Homes/new construction N/A
South: T4-HN Historic Homes N/A
East: T4-HN Historic Homes N/A
West: T4-HN New residential houses N/A
Background: The homeowner (Witt Cox) is requesting to expand heated living space at existing
single-family house in the Historic District by addition in the front of a tower structure.
Approximate square footage of additional living space: 700 ft.2 // Square footage of primary
house: 1,848 ft.2
2
FINDINGS AND RECOMMENDATIONS
• Sec. 3.11.2 – Uses customarily accessory to residential dwellings (D) Accessory Dwelling Unit -
attached: Size: Min.: 240 sf // Max.: 50% of the footprint of the primary unit, or 1,500 SF max.,
whichever is smaller; (see also Sec. 4.5.3 – below)
• Sec. 4.5.3 (Carriage House) – B. Special requirements: (8) Compatibility with Primary Structure:
Architectural details, including color, siding, roof pitch, window detailing, roofing materials, height,
and foundation, shall be compatible with the primary dwelling unit.
• Sec. 4.6.3 – Building Design Guidelines – Specific to Transect-Based Districts (incl. T4 / T5):
A. Building Materials and Details (e.g. walls, columns, railings, doors, roofs, prohibited materials)
B. Roof Forms
C. Windows and Doors (Transparency, Proportion & Details)
D. Architectural Details (Shutters, Cornices, Columns, Bays, etc.)
• Sec. 4.7.2 – Historic District Infill Design Guidelines / General Principles for Compatible Infill:
o Location: This is the relationship between the property and its historical context
o Design: This is the combination of elements that create the feeling of a district or structure. These
elements include building patterns, streetscapes, site elements, building size, mass and scale, spatial
relationships, and specific architectural elements and details.
o Setting: This is the physical environment of a property and should be evaluated on its context as well
as on the historical role the property has played and continues to play. Important features include
topography, vegetation, man-made features, and relationships between existing structures and their
surroundings.
o Materials: These are the physical elements that make up a property or district.
o Workmanship: This is the physical evidence of the crafts of a particular culture or time period. This
particularly applies to rehabilitation projects, but for new infill projects, workmanship of surrounding
structures should be considered and respected. Retaining the details of the original craft and craftsman
(i.e., wood, masonry, tabby etc.) of the original building ensures the historic fabric is retained and
serves as an important component of the integrity and the patina of age of individual structures and the
district as a whole.
o Feeling: This is the property's expression of the aesthetic or historic sense of a particular period of
time. This particularly applies to rehabilitation projects, but for new infill projects, the feeling of
surrounding structures should be considered and respected.
o Association: This is the direct link between an important historic event or person and a property. This
particularly applies to rehabilitation projects, but for new infill projects, association of particular sites
and neighborhoods should be considered.
• Secretary of the Interior – Standards for Rehabilitation
#1: A property shall be used as it was historically or be given a new use that requires minimal change to its
distinctive materials, features, spaces and spatial relationships
#2: The historic character of a property will be retained and preserved. (…)
#3: (…) Changes that create a false sense of historical development, such as adding conjectural features or
elements from other historic properties, shall not be undertaken.
#4: Changes to a property that has acquired historic significance in its own right will be retained and
preserved.
#5: Distinctive materials, features, finishes, and construction techniques or examples of craftmanship that
characterize a property shall be preserved.
#6: Deteriorated historic features shall be repaired rather than replaced. Where the severity of
3
deterioration required replacement of a distinctive feature, the new feature shall match the old in
design, color, texture, and, where possible, materials. (…)
#7: Chemical or physical treatments, such as sandblasting, that cause damage to historic materials shall
not be used. The surface cleaning of structures, if appropriate, shall be undertaken using the gentlest
means possible.
#8: Significant archeological resources affected by a project shall be protected and preserved. If such
resources must be disturbed, mitigation measures shall be undertaken.
#9: New additions, exterior alterations, or related new construction will not destroy historic material,
features, and spatial relationships that characterize the property. The new work will be differentiated
from the old and will be compatible with the historic materials, features, size, scale and proportion, and
massing to protect the integrity of the property and its environment.
#10: New additions and adjacent or related new construction will be undertaken in such a manner that, if
removed in the future, the essential form and integrity of the historic property and its environment would be
unimpaired.
Source: City of Beaufort website. First collected Nov 1, 2026.