TRC/PRE-DESIGN MEETING
AGENDA
Meeting – Tuesday, July 1, 2025
at 10:00 AM
This meeting will be held at 1911 Boundary Street (City Hall) in the Planning Conference Room,
on the 1st floor.
Please click the link below to join the Zoom webinar:
https://us02web.zoom.us/j/83589085470?pwd=u9QrYhqUu3dio14GpaExZsunCNv3C7.1
Password: 153985 Meeting ID: 835 8908 5470 Call in Phone # +1 929 205 6099
Agenda items:
I. Projects
a. Garage conversion into Carriage House / ADU (2602 North Street; PIN: R120 003
000 0466 0000) – Discussion on proposed conversion of current detached
garage/workshop building into a Carriage House / ADU use; Submitted by Juliane
Matthews (Owner)
b. Construction of new Free-Standing Emergency Department (FSED) and Patient
Centered Care (PCC) Complex (396 Robert Smalls Pkwy.; PIN: R120 028 000 1248
0000) – Discussion on proposed development of FSED and PCC location by Novant
Health; Submitted by Ward Edwards (Engineer)
c. Distant Island Bulkhead Restoration and Tree Protection Proposal (Distant Island
Community Association in behalf of 20 property owners on Distant Island; PIN:
numerous) – Discussion on permitting/approval process in special bulkhead restoration
and anchoring to conserve adjacent trees; Submitted by William (“Bill”) Barna, P.E. with
McSweeney (Engineer)
II. Adjournment
If you have any questions, please call (843) 525-7014.
Thank you.
cc: Juliane Matthews (Owner)
Conor Blaney / Sheila Sulak / Amanda Hodge (Ward Edwards Engineering)
Bill Barna (McSweeney Engineers)
2602 NORTH STREET
Conversion of detached
garage/workshop into habitable
living space (ADU/Carriage house)
STAFF REPORT - TRC / Pre-design Meeting
DATE: 07/01/2025
1
Background:
The app licant / ho meowner wants to convert the current metal detached garage/workshop building into an
habitable living space (ADU / Carriage House), including 1 bedroom and 1 bathroom.
GENERAL INFORMATION
Applicant: Juliane Matthews (Owner)
Site Location/Address: 2602 North Street (PIN: R120 003 000 0466 0000)
Applicant's Request: Proposal to convert current detached garage/workshop to habitable
residential living space (ADU/Carriage House). Size of proposed
ADU: 550 sq. ft. (6,925 sq. ft. in total)
Current Zoning: T3-NEIGHBORHOOD DISTRICT (T3-N)
Lot size: 0.28 ac. (~12,197 sq. ft.); Existing dwelling unit: 964 sq. ft.)
ZONING DISTRICT INFORMATION
T3-NEIGHBORHOOD DISTRICT (T3-N)
Lot Width at Front Setback: 40 ft. min.
Max. Lot Coverage: 45% (roofed area); 55% total impervious coverage = ~6,708 sq. ft.
Front Setback: 15 ft. min. / 30 ft. max.
Side Setback: Corner/Alley: 6 ft. min. / no max.; Interior: 6 ft. min.
Rear Setback: 15 ft. min.
Parking Pad Location: There are no parking setbacks, however, driveways shall be located
to the side of the lot/primary structure (except on waterfront lots
meeting the conditions stated in 2.5.4)
SURROUNDING ZONING, LAND USE AND REQUIRED BUFFERS
Adjacent Zoning Adjacent Land Uses Setbacks for Adjacent Zoning
/Buffer required if rezoned
North: T3-N Single-family residential dwelling
unit; N/A
South: T3-N Single-family residential dwelling
unit; N/A
East: T3-N Single-family residential dwelling
unit; N/A
West: T3-N Single-family residential dwelling
unit; N/A
2
FINDINGS AND RECOMMENDATIONS
➢ Sec. 4.5.3. Carriage House:
o Infrastructure: Lot / ADU needs to be served by public water & sewer;
o Number allowed: 2 per lot, except for T3-S where only 1 ADU per lot is allowed
o Frontage Type: No frontage is prescribed unless the building is close to the street, in which case
appropriate frontage types would be: porch, stoop
o Maximum Size: footprint shall not exceed 50% of the primary house’s footprint (in the case: 482 sq.
ft.)
o Compatibility with primary structure: architectural details must comply, incl. siding, color, roof
pitch, roofing material, height and foundation
o Parking: 1 parking space per Carriage House is required, and shall be clearly defined
396 ROBERT SMALLS PARKWAY
Proposal for new development of a
Free-Standing Emergency and
Patient-Centered Care Site
WardEdwards.com T 843.837.5250 F 843.837.2558 PO Box 381, Bluffton, SC 29910
Project: Beaufort FSED & PCC
City of Beaufort, SC
Date: June 4
th , 2025
Applicant: Novant Health
Primary Contact: Matthew Stiene
Senior Vice President, Construction & Facility Services
2085 Frontis Plaza Blvd, Winston Salem NC, 27103
E: mhstiene@novanthealth.org
P: 704-316-4351
Agent: Ward Edwards, Inc.
Primary Contact: Conor Blaney, PE
P.O. Box 381
Bluffton, SC 29910
E: cblaney@wardedwards.com
P: (757) 814-0824
Description
The proposed development is to include a new 11,620 SF Free-Standing Emergency Department (FSED) and
5,750 SF Patient-Centered Care (PCC) in the City of Beaufort, on a 14.4-acre parcel along Hwy-170. The
property is undeveloped, identified as Tax Map Number R120 028 000 1248 0000, and zoned Institutional
and Campus (IC) within the City of Beaufort municipal limits. Proposed drives, parking, landscaping, utilities,
and other infrastructure will also be constructed in support of the development. The site is relatively flat
with elevations running from 21 to 19 and will not require any wetland impacts.
Zoning District
Institutional and Campus (IC)
Tree Removal
To support the proposed development, tree removal will be necessary. The final landscape plan will show
open space area being planted in accordance with the City of Beaufort municode along with the required
street trees and landscape island plantings.
Access
Vehicular access can be made from W.K. Alston Drive and the adjacent multifamily development to the
West of the property. These surrounding roads will also serve for fire protection and emergency vehicle
access.
Parking
The City of Beaufort municode requires 1 per 300 gross square feet for the PCC and 1 per 2 beds, plus 1 per
staff, plus 1 per 4 employees for the FSED. The proposed land plan will exceed this required amount.
Additionally, ADA parking stalls will be strategically located near building entrances and exceed the
required amount as well.
WardEdwards.com T 843.837.5250 F 843.837.2558 PO Box 381, Bluffton, SC 29910
Utilities
An existing 8-inch water main, owned and maintained by the Beaufort-Jasper Water and Sewer Authority
(BJWSA), is available to serve this property and is located along W.K. Alston Drive. Additionally, the adjacent
multifamily development has provided an 8-inch stub-out, which the proposed development may utilize as
a secondary point of connection.
To allow for future capacity needs, the adjacent multifamily development also installed a pump station
designed to accommodate the proposed development. As a result, no further system modifications or
capacity analyses are required.
Drainage
Stormwater runoff from the Western portion of the undeveloped site is currently conveyed to a storm
drain located Southwest of the property, which discharges into Batter Creek and ultimately into the
Beaufort River. Runoff from the eastern portion of the site is directed to an existing stormwater pond
Northeast of the property, which also outfalls into Battery Creek, and subsequently to the Beaufort River.
Stormwater generated from the proposed development will be collected into storm inlets and routed to
onsite stormwater BMPs prior to discharging into Battery Creek. The proposed development will be
designed to collect, treat, and discharge the post-development runoff to the same outfall location at a rate
less than that of existing conditions to meet local and state stormwater regulations.
Erosion Control
Silt fence, inlet protection, dust control, and temporary/permanent seeding will be used to help control
erosion on the site during construction activities. The existing access will be utilized as the construction
entrance.
STAFF REPORT - TRC / Pre-design Meeting
DATE: 07/01/2025
1
Background:
The proposed development is to include a new 11,620 sf. Free-Standing Emergency Department (FSED) and a 5,750
sf. Patient-Centered Care Facility on a 14.4-acre parcel along S.C. Hwy. 170 (Robert Smalls Pkwy.). The development
includes drives, parking, landscaping, util ities and other infrastructure. An existing 8 -inch water main, owned by
BJWSA is available to serve the site from W.K. Alston Dr. Also, a 8” water line stub-out could be utilized coming from
4000 Margaret. Moreover, an installed pump station at 4000 Margaret could serve this location as well.
GENERAL INFORMATION
Applicant: Ward Edwards (Engineer) for Novant Health Holding of SC, LLC
Site Location/Address: 396 Robert Smalls Pkwy. (PIN: R120 003 000 0466 0000)
Applicant's Request: Development of a (1) Free-Standing Emergency and (2) Patient-
Centered Care Facility. Size of proposed buildings: (1) 11,620 sq. ft. &
(2) 5,750 sq. ft. (=17,370 sq. ft.)
Current Zoning: Institutional & Campus District (IC)
Lot size: 14.41 ac. (~627,700 sq. ft.);
ZONING DISTRICT INFORMATION
Institutional & Campus District (IC)
Minimum Lot Width: 50 ft.
Max. Impervious Lot Coverage: 65% ~ 408,005 sq. ft. (9.36 ac.)
Front Setback - Primary: 10 ft. min.
Side Setback - Interior: 10 ft. min.
Rear Setback: 25 ft. min.
Parking Pad Location: Where 10 or more parking spaces are required, the majority of the
parking shall be located in the side or rear of the building.
SURROUNDING ZONING, LAND USE AND REQUIRED BUFFERS
Adjacent Zoning Adjacent Land Uses Setbacks for Adjacent Zoning
/Buffer required if rezoned
North: County Beaufort School District (Robert
Smalls Leadership Academy) N/A
South: IC Undeveloped N/A
East: T5-UC / RMX Wal-Mart / Beaufort Station N/A
West: IC 4000 Margaret Apartment
Complex N/A
2
FINDINGS AND RECOMMENDATIONS
➢ Sec. 3.2 Permitted Uses (Table):
o As per table, “Health Care Facilities” (as further defined in Sec. 3.5.1.C) are permitted outright in
the “IC” district
➢ Sec. 4.6.4 Building Design Standards – Specific to Conventional Districts:
A. Building Materials and Details:
1. Building walls shall be finished in 1 or more (but not more than 3) of the following materials:
a. Wood, painted or natural.
b. Fiber cement board siding, smooth finish.
c. Concrete masonry units with stucco (CBS).
d. Reinforced concrete with stucco.
e. Brick.
f. Tabby (or stucco with oyster shell aggregate, typ.).
g. Corrugated metal.
h. Other compatible and authentic materials as approved by the Administrator.
B. Roof Forms, Specific to RMX and IC Districts:
1. In general a slope of 4:12-12:12 is appropriate for primary roofs, while ancillary roof slopes may be 3:12-
5:12.
2. Permitted roof types include gabled, hipped, shed, barrel vaulted, flat, mono-pitch, mansard, and domed.
Applied and partial (less than 3 sides) mansard roofs are not typically permitted, but may be at the
discretion of the Design Review Body based on compatibility with the surrounding context, size, mass and
scale of the structure.
3. Shed, flat, and mono-pitch roofs shall be concealed with parapets along the street frontage.
4. Specific to IC District:
a. Downspouts and gutters are to be galvanized steel, aluminum, or copper. Downspouts and gutters
are to match in materials and finish.
b. Chimneys shall have a masonry exterior finish.
c. Roof penetrations shall be hidden or painted to match the color of the roof.
d. Skylights must be flat to the pitch of the roof and shall not be located on any sloped roof facing the
primary frontage.
C. Windows and Doors:
1. Transparency, Specific to RMX and IC Districts: Building elevations that face the street shall have at least
40% of the first-floor wall area consist of windows and/or doors, and 15% of upper floors.
D. Massing and Articulation:
1. Building footprints shall not be larger than a single block. Where there is not a defined block structure in the
area, see Section 7.2.2 B. for additional standards. → Block Sizes: Blocks shall be compact so that they are
comfortably walkable and appropriate for their context.
3
➢ Sec. 5.5.1.B Buffer Requirements – Corridor Buffers:
o Location: Robert Smalls Pkwy. (SC170) from Parris Island Gateway (US21) to the Broad River bridge –
Required Buffer Width: 50 ft. min.; Number of Trees/Shrubs req. per 100 ft. of frontage: 3 broad-
leaved overstory trees / 8 understory trees / 25% coverage of buffer areas with shrubs
➢ Sec. 5.7.4 Parking Space Requirements – Services (Medical):
o Doctor’s Offices: 1 space per 300 gross square feet (equals to at least 58 parking spaces)
o Other: 1 space per 2 beds, plus 1 space per staff, plus 1 space per 4 employees
→ see Sec. 5.7.7 for Parking Lot Design and Sec. 5.7.8 for Parking Lot Screening and Landscaping
requirements
➢ Sec. 5.8.3 & 5.8.4 General & Design Standards for Exterior Lighting
➢ Sec. 7.2.2 C. Street Stubs / Continuation of adjoining Street System: New developments shall if
practicable, connect to any existing street stubs from adjacent properties and stub to all adjacent
properties.
➢ Sec. 7.2.3 Lot Access Standards
o 2. Spacing / Curb Cuts: Minimum Spacing requirements on Robert Smalls Pkwy.: 500 ft.
DISTANT ISLAND COMMUNITY
(NUMEROUS ADDRESSES)
Discussion on Bulkhead
Replacement Project
SC nFPARTMENT of
EXVIROH[,IENTAt
SERUICES
September 30,2024
Distant lsland Community Association
31 1 Carteret Street
Beaufort, 5C 29902
5q65 EEIE EEe? h166 U38h Ee
Re: OCRM05450
Dear Distant lsland Community Association:
The Bureau of Coastal Management (the Department) has reviewed your application to construct a community
bulkhead on Distant lsland, Beaufort, Beaufort County, South Carolina and has issued a permit for this work. you should
carefully read the description of the authorized project and special conditions that have been placed on the permit, as
these conditions may modify the permitted activity, ln addition, there are a series of general conditions that should be
reviewed' The original and one photocopy of the permit, as issued, are enclosed. After carefully reading the permit, ifyou wish to accept the permit as issued, sign and date in the signature block entitled "PERMITTEE" on the original
version of the permit and return it to this Department. Keep the photocopy for your records.
PLEASE READ CAREFULLY: You are required to sign and return the original version of your permit to thisDepartment within thirtv (30) days. S.c. code Ann. s 48-6-30(DX2) provides, 'within thirty calendar days after themailing of a decision [pursuant to S.C. Code Ann.5 48-6-30(DX1)], an applicant, permittee, licensee, certificateholder, or affected person desiring to contest the department decision may request a contested case hearingbefore the Administrative Law Court, in accordance with the Administrative procedures Act.,'
In order to request a construction placard, please submit a critical area placard request through epermitting.
You must send in this request before the time you wish to start construction. At that time a constructionplacard will be sent to you to post at the construction site.
PLEASE NOTE: You are not authorized to commence work under the permit until we have received the original version
of the entire permit signed and accepted by you, and a construction placard has been issued and posted ai the
construction site. The receipt of this permit does not relieve you of the responsibility of acquiring any other federal,
state, or local permits that may be required. Please return the signed permit to the following address:
Bureau of Coastal Management
104 Parker Drive
Beaufort, SC 29906
a Valiulis
Project Manager
Critical Area Permitting Section
,
Enclosure
cc; Mr. Blair Williams, Critical Area permitting Section Manager
SCANNED t
cLrENr #-&)!-
info@des.sc.gov I des,sc.gov | 803.898.3432
SOUTH CAROLINA DEPARTMENT OF ENVIRONMENTAL SERVICES
BUREAU OF COASTAL MANAGEMENT
CRITICAL AREA PERMIT & COASTAL ZONE CONSISTENCY CERTIFICATION
Permittee(s):
Permit Number(s):
Date of lssuance:
Expiration Date:
Location:
Distant lsland Community Association
ocRM05450
September 30,2024
September 30,2029
sffiffi $pffi#$Ah
#ffiruffi8T$ffiFd(S)
on and adjacent to Distant tsland creek on lots 82,94,86, 89, go,92,94, 98,1oo,1oz, 106,
and 6 community owned easement lots on Distant lsland, Beaufort
Beaufort county, south carolina ((TMS#: R123 018 000 0768 0000 (5 community
easements); Rl23 018 000 0666 0000 (community boat landing easement); Rl23 018 000
0650 0000 (lot 82); R123 018 000 05G3 0000 (lot S4); ntZS 018 000 0637 0000 (tot 86); R123 018
000 0581 0000 (lot 88); Rl23 018 000 0638 0000 (tot 90); Rl23 018 000 0651 0000 (tot gz)i R123
018 000 0639 0000 (lot 94); R123 018 000 0653 0000 (tot 98); Rl23 018 0OO 0592 0000 (tot 100);
Rl23 018 000 0640 0000 (lot 102); R123 018 0OO 0533 0000 (tot 106))
This permit is issued under the provisions of S. C. Code Ann, Section 48-39-10, et seq., and 23A S.C. Code Ann. Regs. 30-.1
through 30-18, os amended, Please carefully read the project description and special conditions th"t "pp""ionthis permit/certification as they will affect the work that is allowed and may modify the work from that shown
on the submitted plans. All special conditions attached to the permit will take precedent over submitted plans.
The general conditions are also a part of this permit/certification and should be read in their entirety. The S. C.
contractor's Licensing Act of 1999, enacted as s.C. Code Ann. section 4o-11-5 through 430, requires that all construction
with a total cost of $5,000 or more be performed by a licensed contractor with a valid contractor's license for marine
class construction, except for construction performed by a private landowner for strictly private purposes. your
signature on and acceptance of this permit denotes your understanding of the stated law regarding use of licensed
contractors. All listed special and general conditions will remain in effect for the life of the permit. This applies topermittee, future property owners, or permit assignees.
DESCRTPTTON OF THE PROJECT
As Proposed: lnstall approximately 1565 LF bulkhead and seven (7) tree wells along Distant lsland creek for thepurpose of shoreline Stabilization.
As Authorized: To replace the existing bulkhead and install a new bulkhead at the following properties on Distant
lsland: lots 82, 84,86,88,90, 92,94,98, 100, 102,106, and 6 community owned easement lots. specifically, to install a
total of '1565 linear feet of bulkhead, 8'- 15' high, no further than 18" from the critical area line verified on August 1st,
2024.7 tree wells are authorized along the bulkhead with varying distances seaward from the critical area line, ai shown
in the attached drawings, The purpose of the project is for erosion control forthe Distant lsland Community.
SPECIAL CONDITIONS
The proposed bulkhead is no fufther than 18" from the critical area line verified on 0810112024, aside from the 7
proposed tree wells, as shown in the revised drawings submitted on 0g12212024.
All scrap treated wood and other debris is removed from the area prior to filling, and only clean fill dirt or sand is used as
backfill. The earthen banks adjacent to the bulkhead must be stabilized with a vegetative cover as soon as possible after
construction to minimize erosion.
2
toPll
3
$ffiffi spffiffiHAfl_
ffiffiruffiffTfiffiru{s}
Any disturbed critical area adjacent to the construction site must be restored to original contours anC conOitions uponproject completion.
4. Once the project is initiated, it must be carried to completion in an expeditious manner in order to minimize the period ofdisturbance to the environment.
5. The bulkhead should be located in a manner so as to minimize disturbance to shellfish resources or in an area void ofshellfish resources. lf this requires the relocation of this structure, notification to DES-BCM is required and written
approval for the relocation must be received from DES-BCM prior to construction.
6. An as-built survey of the entire erosion control structure must be submitted to the Department within g0 days of the
expiration date of the final construction placard. The survey must be performed by a registered land surveyor, must
show all components of the structure, and must list the starting and ending coordinates of the structure in the'SC State
Plane Coordinate System, which can be obtained by survey-grade Global Positioning System equipment.
7. ln the event that any historic or cultural resources and/or archaeological materials are found during the course of work,
the applicant must notifo the State Historic Preservation Office and the South Carolina lnstitute of Archaeology and
Anthropology. Historic or cultural resources consist of those sites listed in the National Register of Historic places and
those sites that are eligible for the National Register. Archaeological materials consist of any items, fifty years old or
older, which were made or used by man. These items include, but are not limited to, stone projectile points (arrowheads),
ceramic sherds, bricks, worked wood, bone and stone, metal and glass objects, and human skeletal materials.
?. 'e Jl
sffiffi spffiffi$AL
ffiffiruffisrsffiru(s)
PERMITTEE'S ATTENTIoN ls DIRECTED To GENERAL coNDtIoNs NUMBERS FouR (4)AND FtvE (5).By AccEpfnrucE or
THIS PERMIT, PERMITTEE IS PLACED ON NOTICE THAT THE STATE OF SOUTH CAROLINA, BY ISSUING THIS PERMIT, DOES
NOT WAIVE ITS RIGHTS TO REQUIRE PAYMENT OF A REASONABLE FEE FOR USE OF STATE LANDS AT A FUTURE DATE IF
SO DIRECTED BY STATUTE.
THE PERMITTEE, BY ACCEPTANCE OF THIS PERMIT AGREES TO ABIDE BY THE TERMS AND CONDITIONS CONTAINED
HEREIN AND TO PERFORM THE WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS ATTACHED
HERETO AND MADE A PART HEREOF.ANY DEVIATION FROM THESE CONDITIONS, TERMS, PLANS AND SPECIFICATIONS
SHALL BE GROUNDS FOR REVOCATION, SUSPENSION OR MODIFICATION OF THIS PERMIT AND THE INSTITUTION OF
SUCH LEGAL PROCEEDINGS AS THE DEPARTMENT MAY CONSIDER APPROPRIATE.
Permit Number: OCRM05450
o-
PERMTTTEE(S)
Distant lsland Association
DATE
CRITICAL AREA PERMITTING PROJECT MANAGER
Sophia Valiulis
Or Other Authorized State Official
DATE
3 o( t?
GENERAL CONDITIONS:
$ffiffi spffiffisAil
cffirurysrsryru($)
This construction and use permit is expressly contingent upon the following conditions which are binding on the
permittee:
1' The permittee, in accepting this permit, covenants and agrees to comply with and abide by the provisions and
conditions herein and assumes all responsibility and liability and agrees to save the Department and the State
of South Carolina, its employees or representatives, harmless from all claims of damage arising out of
operations conducted pursuant to this permit.
2. lf the activity authorized herein is not constructed or completed within five years of the date of issuance, this
permit shall automatically expire. A request, in writing, for an extension of time shall be made not less than
thirty days prior to the expiration date,
3. All authorized work shall be conducted in a manner that minimizes any adverse impact on fish, wildlife and
water quality.
This permit does not relieve the permittee from the requirements of obtaining a permit from the U. S. Army
Corps of Engineers or any other applicable federal agency, nor from the necessity of complying with all
applicable local laws, ordinances, and zoning regulations, This permit is granted subject to the rights of the
State of South Carolina in the navigable waters and shall be subject, further, to all rights held by the State of
South Carolina under the public trust doctrine as well as any other right the State may have in the waters and
submerged lands of the coast.
5. This permit does not convey, expressly or impliedly, any property rights in real estate or material nor any
exclusive privileges; nor does it authorize the permittee to alienate, diminish, infringe upon or otherwise restrict
the property rights of any other person or the public; nor shall this permit be interpreted as appropriating
public properties for private use.
6. The permittee shall permit the Department or its authorized agents or representatives to make periodic
inspections at any time deemed necessary to ensure that the activity being performed is in accordance with the
terms and conditions of this permit.
7 . Any aba ndon ment of the perm itted activity will req uire restoration of the a rea to a satisfactory cond ition as
determined by the Department
8. This permit may not be transferred to a third party without prior written notice to the Department, either by
the transferee's written agreement to comply with all terms and conditions of this permit or by the transferee
subscribing to this permit and thereby agreeing to comply.
9. lf the display of lights and signals on any structure or work authorized herein is not otherwise provided for by
law, such lights and special signals as may be prescribed by the United States Coast Guard shall be installed and
maintained by and at the expense of the permittee.
1 0. The permit construction placard or a copy of the placard shall be posted in a conspicuous place at the project
site during the entire period of work.
11. The structure or work authorized herein shall be in accordance with the permit, as issued, and shall be
maintained in good condition. Failure to build in accordance with the permit, as issued, or failure to maintain
the structure in good condition, shall result in the revocation of this permit.
4.
q DP Il
sffiffi $pH#$AL
c$ruDrTssru{$}
12. The authorization for activities or structures herein constitutes a revocable license, The Department may
require the permittee to modiry activities or remove structures authorized herein if it is determined bythe
Department that such activity or structures violates the public's health, safety, or welfare, or if any activity is
inconsistent with the public trust doctrine. Modification or removal under this condition shall be ordered only
after reasonable notice stating the reasons therefore and provision to the permittee of the opportunity to
respond in writing. When the Permittee is notified that the Department intends to revoke the permit, Permittee
agrees to immediately stop work pending resolution of the revocation.
13, The Department shall have the right to revoke, suspend, or modify this permit in the event it is determined the
permitted structure (1) significantly impacts the public health, safety and welfare, and/or is violation of Section
48-39-150, (2) adversely impacts public rights, (3) that the information and data which the permittee or any
other agencies have provided in connection with the permit application is either false, incomplete or inaccurate,
or (4) that the activity is in violation of the terms and/or conditions, including any special conditions of the
permit. That the permittee, upon receipt of the Department's written intent to revoke, suspend, or modify the
permit has the right to a hearing, Prior to revocation, suspension, or modification of this permit, the
Department shall provide written notification of intent to revoke to the permittee, and permittee can respond
with a written explanation to the Department,(South Carolina Code Section 1-23-370 shall govern the
procedure for revocation, suspension or modification herein described).
14. Any modification, suspension or revocation of this permit shall not be the basis of any claim for damages
against the Department or the State of South Carolina or any employee, agent, or representative of the
Department or the State of South Carolina,
15, All activities authorized herein shall be, if they involve a discharge or deposit into navigable waters or ocean
waters, at all times consistent with all applicable water quality standards, effluent limitations, and standards of
performance, prohibitions, and pretreatment standards established pursuant to applicable federal, state and
local laws.
16. Extremecareshall beexercisedtopreventanyadverseorundesirableeffectsfromthisworkonthepropertyof
others. This permit authorizes no invasion of adjacent private property, and the Department assumes no
responsibility or liability from any claims of damage arising out of any operations conducted by the permittee
pursuant to this permit.
5 b( J'l
arGG #tr"ffiq/E#qk
ffiffiNrysTnffiru{s}
DIRECTIONS TO SITE FROM CHARLESTON:
_TAKE CALHOUN ST TO SC-30 W
-TAKE SC_61 N TO HWY 17 S
_CONTINUE ON HWY 17 S TO BEAUFORT COUNTY
_TAKE EXIT TO HWY 21 S AND CONTINUE SOUTH
-TAKE RIGHT ONTO CHOWAN CRK BLF
-TAKE RIGHT ONTO DISTANT ISLAND DR
PROJICT VICINITY
SCALE: 1" : 6000'
MOSSY OAKS
HWY-21
PROJECT LOCATION
DISTANT ISLAND,
(LoTS 8o-118)
BEAUFORT SC, 29907
LATITUDE: 32.3884 N
LONGITUDE:80.6359 W
PORT ROYAL
PURPOSE: SHORELINE STABILIZATION
AD.'ACENT PROPERTY OW.IERS:
SEE SCHEDULE SHEET 16
APPUCANT
DISTANT ISLAND COMM- - --:AliE[r::McSWEENEY ENGINEL
1 "=6000'
1 2000'
VI
FIGURE 1
CINITY MAP
ASSOC., tNC.
RS. LLC
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
COUNTy OF: BEAUFORT, SC
REVlSlOll NO: 2
SIIEET: 1 oF 16 DATEz 8/22/2024
PROPOSED:
WATERWAY:
U,P lr
sffiffi spffiffiHd$-K_
DIRECTIONS TO SITE FROM CHARLESTON:
_TAKE CALHOUN ST TO SC-30 W
_TAKE SC_61 N TO HWY 17 S
-CONTINUE ON HWY 17 S TO BEAUFORT COUNTY
_TAKE EXIT TO HWY 21 S AND CONTINUE SOUTH
-TAKE RIGHT ONTO CHOWAN CRK BLF
_TAKE RIGHT ONTO DISTANT ISLAND DR
PROJICT LOCATION
SCALf: 1" : 4OO0'
GIBBS
PROJECT LOCATION
DISTANT ISLAND,
(Lors Bo-118)
BEAUFORT SC, 29907
LATITUDE: 32.3884 N
LONGITUDE:80.6359 W
SLANDI
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW OIU}.IERS:
SEE SCHEDULE SHEET 16
FIGURE 2
LOCATION MAP
1 "=4000'
Sooo'
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC.
AGENT
McSWEENEY ENGINEERS. LLC
PROPOSED:
WATERWAY:
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
COUNW 0F: BEAUFORT, SC
REVISION NO: 2
SIIEET: 2 oF 16 DATET 8/22/2024
1ot )1
1 4"O
12-O
12'CH.
r o"cH'i6'LO
22"Lo r
21"LO
17"1O
ors,
7'lt>
Qno30"to
21 "LO .
i{"ip
17"1O
FOUND
LOT 86
NATIIAN K SMITH R€VIRUST OF
2OOE SMIfr ZACHARY DIXON
t,
r 3'LA
t5"u
9"O
fo"ro
i z'pe
. tJ"Lo.
14"U
16"1A .
14"SUB
U
N v
NAIL IN
" sffiffi spffiffiHA
SEAWALL
vVw
ffiffiruffiHTHffiru{S}
v v3"
S
v .,.*$
v
NAIL IN
SEAWALL
v
v j
iL v
o'",
b 40)
oA /,tto^ <"1"
Vt, vo
""or31'i
?*'
v
g
/*^*(v-
v
{,
v
DES_BCM CRITICAL LINE
AND EXISTING SEAWALL IRON v
FOUND
v
v v LOT E4
ROBERT C. ROLFE
DIANE C, ROLFEv
v
v voo
v
i9
IRON PIN
REBAR
FOUND
vel
V FOUND
vg
v
@
v
ll'to. FOUND
ir'ro
v
Vo
v
v
J,
'ni56.. LOT 82
JOHN SAMUEL O'BRIANI JR.
MARY BETH O,BRIANTif
v
RIP
s v
v
vv
v ! 22"Lo
lo"Lov.
LOT 80
'zt"to DISTANT ISLAND CO. LP
v^r+"pl v9'
FOUND I6'LA 12'9 FOUND
TXISTING SITt PLAN-LOTS BO- 86
SCALE: 1:60
NOTE: THIS DRAWING lS FOR
PERMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PERFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST '1,
2024.
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
coUNTY OF: BEAUFORT, SC
REVISION NO: 2
SHEEI 3 oF 16 DATE: 8/22/2024
PROPOSED:
WATERIYAY:
ESIBL|I
EXISTING SITE PLAN LOTS 80-86
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC
AGENT
McSWEENEY ENGINEERS. LLC
120'
1: 60
6o'
PURPOSE: SHORELINE STABILIZATIOI.
ADJACENT PROPERW OWIIERS:
SEE SCHEDULE SHEET 16
t, )P tf
JAN
2s'LO'
20'LA.
1 SIPA
l+'pn
14JLA
g"LO .
,r.po 3o.ro'
iz'pe
i+'pr
u'o"ro
13'U
1E"O. 9.gg "il"CH
14"O.
16'LA
1s"u11"u
8"LO:7"1O
2"A
8"LO
LOT 92
YARAUAN ZAVAN YARAUAN,
LORRAINE M
580 DISTANT ISLAND DR, BEAUFORT,
sc 29907
FOUND
15-U.9"1A,,rJ-[A. il"LA
to'ri
14,'6 .1a"o.
12"O'
17"LO
JO'LO
21 "LO .
t2"cH .
to'cn'16'LO.
22'LO r
24"LO
N p A
iC .,.
NAIL IN
W E
ffiffiruffiHTHffiru{ffi}
v
V NAIL IN
s *.
i9v
,/q"""(w-
oz^
ba4oooo'g
oa)a+^
"t'&+
'qn
vv
v v
NAIL IN
SEAWALL
v v wd
v
v
v v
-
+DES_BCM
CRITICAL LINE
AND EXISTING
SEAWALL
v
v
v
v
NAIL INV
v
NAIL IN
SEAWALL
vV
v s30
v *$
v
NAIL IN
SEAWALL
*
.:t 't-
v ^5
v!,
FOUND
LOT 90
KATHRYN SMOKE TRUST
NOTE: THIS DRAWING lS FOR
PERIVITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PERF-ORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
FOUND
LOT 88
BENJAMIN BLAKE SCANDLEN
AMANDA ALICE SCANDLEN
FOUND
%
LOT 86 vc
NATHAN K SMITH REV NUST OF
2OOA SMIff ZACHARY DIXON
/4,e
EXISTING SITt PLAN-LOTS BB-92
AN D COM VlU N ITY ACCTSS LOTS
SCALE: 1:60
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW OIVT'IERS:
SEE SCHEDULE SHEET 16
IXISTING SITE PLAN LOTS 88-92AND CON/IVUNITY ACCESS LOT
APPUCANT
DISTANT ISLAND COMM.
AGENT
McSWEENEY ENGINEE
FICURE 4
60' 120'
t: ou
ASSOC., tNC.
RS. LLC
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
couNTY on BEAUFORT, SC
REVISION NO: 2
sHEEn 4 OF 16 DATEz 8/22/2024
PROPOSED:
WATERWAY:
1 o( xl
o49'LO
j)e"Lo
TERSIDE
IN
SEAWALL'
9'CH
le"ro
1I'MAG -
I7'MAG'
FOUND
-
JO"LO
LOT 100
GEORGE F. EVANS
\z"o
/fua
34"1O 3
25'LO.
40'LOa
23'LO
1 /2"
REBAR
FOUND
L
LOT 9A
AARON P. SARATHY
JENNIFER K. WALLACE
iL
v
NAIL IN
vv
N NAJL IN
SE{,{VALL9
Ew
s
/fk/ '<\
v
vo.o,b
a+,
oa-to-
,a u+a
'"% hr"
V%*
rg
vi,
v
v
v
g
v
IN
v
v
v
v
v
v
v
irv
v
v
vv
v
vv
i9v
.,. ig
ib
it
v
DES-BCM
CRITICAL LINE
AND EXISTING
SEAWALL
vv
NAIL IN
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PERFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
NOT PARIICIPATING IN BULKHEAD REPLACEMENT
LOT 96
BERGMAN JOINT REV. TRUST
FOUND
effiffi qffi
Ed&EE&s qdH
loT 94
JAN T, MCLAREN LIVINC TRUST
ffiffiruffifiTHffiru(
g-LO .
TXISTING SITt PLAN-LOTS 9+. 98 & 1OO
AND COMMUNITY ACCTSS LOT
SCALE: 1:60
NOTE: THIS DRAWING IS FOR
PERMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
couNw oF: BEAUFORT, SC
REVlSlO,l NO: 2
SFIEET: 5 oF 16 DAIEr 8/22/2024
PROPOSED:
IYATERIYAY
ESTBE.I
EXISTING SITE PLAN LOTS 94.98&1OO
AND COMMUNITY ACCESS LOT
AEEICANT
DISTANT ISLAND COMM. ASSOC., INC.
AGEttlT
McSWEENEY ENGINEERS. LLC
1: 60
120'0'
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW OIYT,IERS:
SEE SCHEDULE SHEET 16
lo oP t'l
NOl PARTICIPANNG IN BULKHEAD REPLACEMENT
LOT lOE
2021 MICHELLE N. GARONER
REVOCABLE TRUST
DAVID SCOIT PROUT
REVOCABLE LIVING TRUST
1 /2"
REBAR
BRICK
PIT
FOUND
DIST.
1 E"LO .
s
WEATH
,2'LO
az"to
s 89'08'28" W
a LOT 106
RILEY LIVING IRUST
R123 018 000 0768 0000
DISTANT ISLAND COMM. ASSOC. INC.
N
I
E
NOT PARTICIPATING IN BULKHEAD REPLACEMENT
LOT 104
FAITH MCALHANEY HARPER
REVOC. TRUST
2t'LO
a42"LO
9"O
2t"u.
24'O.
NOTE: THIS DRAWING lS FOR
PERMJTTING PURPOSES ONLY AND
IS NOT TO BE USED TOR
ENGINEERING DESIGN OR
CONSTRUCTION.
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PERFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
(i-
v- v
{,
s 75'20'1{
*,7.1
CREEK
\\XRSI\CRA59
v
vrN
o\91[N1
\+FNo
oPPog\\\c
v
1O ik
v
N
{,
NAIL IN
SEAWALL
s 80'51'16" W
13-O1' v
w E
!,
i9
VV
&
NAIL
i&
S
-s
ff?
vv
{,
v rN
@
DISTANT ISLAND CREEK
..-t350' TO OPPOSTNG MARSHCRASS
v v
t1
v
g{!
ov1
NAIL IN
srnwlll v I
A\
#)\r/
ffiffi
!{tE?E
$*grrgE
ffi
@
#;
ffi
&3
&
v
glL
v
FOUND
DES-BCM
CRITICAL LINE
AND EXISTING
SEAWALL
i, ib
v *E
* LoT 102
OONALD I. PRATT, JR.
GERALOINE O. PRATT
v
v
NAIL IN
srX.waug
rg
v
aas'10
29"10
v FOUND
v,
EXISTING SITI PLAN-LOTS 102 & 106
AN D CON/ N/ U N ITY ACCESS tOT
SCALE: 1: 60
tril tltll
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW Ol{l,lERS:
SEE SCHEDULE SHEET 16
FIGURE 6
SITE PLAN LOTS 1OO
COMMUNITY ACCESS L
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC
AGENT
McSWEFNFY ENGINEERS. LLC
bU
60'0'
EXISTING
AND
& 102
OT
120'
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
COUNW OR BEAUFORT, SC
REVlSlS.l NO: 2
SHEEI 6 oF 16 DATEr 8/22/2024
PROPOSED:
IYATERWAY:
l( Dt )l
.J4
@l
BLAND
BLAND
MATTHEW W
ANARA H.
1A'U
ls[8:
N
w E
1 /2"
REBAR
s
NOT PARTICIPATING IN BULKHEAD REPLACEMENT
LOT 114
DISTANT ISLAND CO. LP
27"A a
FOUND
I /2"
REBAR
NOT PARTICIPATING IN BULKHEAD REPLACEMENT
LOf 112
DISTANT ISLAND CO, LP
8"1O11'PA
31"ua
D\S1AN1
Asgoc
roNR"".on'*
NAIL IN
12"PA
l')
ov
v iL
v
v
!,
i&
v
Vv
v
v
FOUND
v
PK
v
PK
FOUND
v
NAIL IN
SEAWALL
NOT PARTICIPATINC IN BULKHEAD REPLACEMENT
LOT'l'10
NOT PARTICIPAI1NG IN BULKHEAD REPLACEMENT
LOT 108
2021 MICHELLE N. GARDNER
REVOCABLE IRIJST
OAVID SCOTT PROUT
REVOCABLE LIVING IRUST
FOUND
1 /2"
REBAR
BRICK
PIT
FOUND
DIST.
WLLIAM H. CHAIFIELD
ANNE W. CHATFIELD
22"O .
18-10 .
v
VG Vo
v
d%
€ffi\s#ryffi*
ffi
@
h
EEIC!!Ed
ffiffiffiffi
Vv
$,-
v ie * "JF,
s 75'20'14'
v7
CREEK
o??os\\\G
v(N
t2"LO
12"rc
D\S1AN1
\+AND
g
IL
v
1O ig
v
NAIL IN
EXISTING SITE PLAN
CON/MUNITY ACCESS LOT
SCALE: 1: 60
NOTE: THIS DRAWING lS FOR
PIRMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINTERING DESIGN OR
CONSTRUCTION.
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PIRFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
COUNTY OF: BEAUFoRT, Sc
REVISION NO: 2
SHEEI 7 oF 16 DATE: 8/22/2024
PROPOSED:
WATERTYAY:
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW Ol$,lERS:
SEE SCHEDULE SHEET 16
BSIEEJ
EXISTING SITE PLAN
COMMUNITY ACCESS LO
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC,
AGENT
McSWEENEY ENGINEERS. LLC
60
60'
T
1
o'
lr op J'7
N
w E
$ffiffi spffiffiHAH-
ffiffiFWffiffiTHffitrW(S3
s
LOT 120
DISTANT ISLAND CO.
BOAT LANDING
FOUND
Dtsr.v
{, v
v ir
vs
v
I s'LO
'1g'LO
v
R
F1
i&
L99 v 1t
v
v 1,2
vv
v
v
v v
la
vv v
DES-SCM v i9 v
--Re
r88
CRITICAL LINE
AND EXISTING
SEAWALL
vvv
TACK
h
ooQ$ ,nt"*
-. $'
s$-"t€
oQ'
SEAWALL I}
t G
*,
v
(o
v
iL
{9
v
^o FOUNI
v
TXISTING SITE PLAN
BOAT LANDING
SCALE: 1: 60
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERTY OIYI.IERS:
SEE SCHEDULE SHEET 16
FIGURE 8
EXISTING SITE PLAN- BOAT LANDING
1: 60o' 60' 12o'
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC.
AGENT
McSWEENEY ENGINEERS. LLC
PROPOSED:
ITATERWAY:
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
coUNTY OF: BEAUFORT, SC
REVISION NO: 2
SHEEI 8 oF 16 DATEz 8/22/2024
t3 6f- e]
ta'o
1 7'LO .
1 2'CH .
l6.,LO.1O"CH'
22"LO I,1't 6 or.s,
4+o
,orn
*,
ib
VV
v
v
v
NAIL
i&
NAIL IN
SEAWALL
21'Lo .
i9
v
0'10'
i9
v
FOUND
IRON
v v
v v
FOUND
LOT 86
NAfrAN K SMIIH REV RUST OF
2OOA SMIH ZACHARY DIXON
v
t,
'12'PA
r 3"LA
15"4
13'LO
1
e"ei
' 9'OiL
v
{,
IRON PIN
v
v
1'oi56r
1r"Lo. FOUND
ir-uo
FOUND
LOT 84
ROBERT C. ROLFE
DIANE C. ROLFE
t4"su8
N
sffiffi,%pffiffiH
w "mffiruffiBTHffiffS{ffi
s
IMPACTS:
BACKFILL AND BEDDING
1523 ACRES
441 CUBIC YARDS
PROPOSEO TREE
rt/ELL #2
(139 SF F|LL)
,/"Y^"'(v"
Ozn
b"4",oo^ ,a'b^ '"1,n2t,'YO
"'"*3$-
6
't
PROPOSED
TREE WELL #I
(r45 SF F|LL)
DES-BCM CRITICAL LINE
AND EXISNNG SEAWALL
PROPOSED BULKHEAD
PROPERTY BOUNDARY
FOUND
v
v
v
v
v
@ LOT 82
JOHN SAMUEL O'BRIANT, JR.
MARY BETH O'ERIANTi9 v v
v
lO,BULKHEAD
RETt'RN v v
r+"ci
J' v
v
o
22"LO .
I o"LO .
'zt"Lo
iL
v
LOT 80
DISTANT ISLAND CO. LP
vsl
1 /2"
REBAR
r'o-re
FOUND
P R OP OSED SITE PLAN-LOTS BO-86
SCALE: 1: 60
!tllnr
NOTE: THIS DRAWING lS FOR
PERMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PERFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
couNw oF: BEAUFORT, SC
REV|S|ON NO 2
SHEEI 9 oF 16 DAIEz 8/22/2024
PROPOSED:
ITATERWAY:
ADJACENT PROPERW Olll.lERS:
PURPOSE:
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC.
AGE}.IT
McSWEENEY ENGINEER
LOTS 80-86
1: 60
BSIEE.g
SITE PLAN
60'o'
PROPOSED
S. LLC
lq o{' 21
v
NAIL
iL
v
v
vig
V NAIL IN
v
JAN
1 6'PA
I3"PA
iz'es
20"u .
2s"Lo'lYPA
lr"pe
9"LO .
14'pa .2O"LO'
v
NAIL IN
SEAWALL
vv
v
-o
i3"u
1cO.
1E"O. g,'CH -il"CH
l8'LA .
15'LA1l'LA.
v
*1
v
8"LO
2"U
8"LO:7'Lo
LOT 92
YARALIAN ZAVAN YARAUAN,
LORRAINE M
580 OISIANT ISLAND DR, BEAUFORI.
sc 29907
FOUND
v
v
NAIL IN v t5'U.9'LA-.
l5"LA ! 11-LA
1 o-LA
14"o.1a,,o.
12"O'
N
ffi spffiffifiAL
w E
ffiffiruffifi"ffitr{"?ru{ffi}
S PROPOERTY BOUNDARY
/'Y.e
PROPOSED
4"o
+r'4'r^
."";h,.
IMPACTS:
BACKFILL AND BEDDINC
1323 ACRES
441 CUBIC YARDS PROPOSED TREE
WELL #3
(149 SF F|LL)
DES_BCM
CRITICAL LINE
AND EXISTING
SEAWALL
22'Loi
24"rc
1 7'LO
16-LO
t2"cH .
to'cx'
v
28'
v
v
vV
v
v
v
NAIL
v
NAIL IN
SEAWALL
21 "LO .
FOUND
LOT 90
KATHRYN SMOKE TRUST
NOTE: THIS DRAWING lS FOR
PERMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
ALL CRITICAL LINE INFORIUATION
IS OBTAINED FROM A PLAT
PERFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
1 /2"
REBAR
FOUND
LOT 88
BENJAMIN BLAKE SCANDLEN
AMANDA AUCE SCANDLEN
REBAR
FOUND
ors"
44o
4>n+o
;::ip
c^
"u,,
LOT 86
NATHAN K SMIfr REV NUST OF
2OO8 SMIN ZACHARY OIXON
\ /4'^
REBAR
PROPOSED SITE P I AN - LOTS BB-92
AND COMMUNITY ACCESS LOTS
SCALE: 1:60
Itiltit
PROPOSED: BULKHEAD
IYATERIVAY: DISTANT ISLAND CREEK
IN: BEAUFORT
COUNW OF: BEAUFORT, SC
REVISIo}{ NO: 2
SHEET: 10 oF 16 Dl:lEt 8/22/202+
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW OIIT'IERS:
SEE SCHEDULE SHEET 16
FIGURE 10
ROPOSED SITE PLAN LOTS
AND COMMUNITY ACCESS
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC.
60
60'
P
0'
AGENT
EY ENGINEER
120'
88-92
LOT
McSWEEN S. LLC
15 oP x.-l
NAIL IN
SEdfuALL
15
3e"rn
DONALD I. PRATT, JR.
GERALDINE O. PRATT
v
v
NAIL IN
v
2'
$
*,t
vl-
I
ENT
v
v
IN
SEAWALL
la-ro
r1'MAG -
t7"MAc j
I
FOUND
JO"LO
a
LOT 100
GEORGE F. EVANS
iz'o
/,VC
"or"
2J"LO.
{"Loa
v
v*
v
v
v
IMPACTS:
EIERFM AND BEDDING
1J23 ACRES
44,I CUBIC YARDS
N
w E
s
/sYs/ '<'
v
v
v
v
{4 i&
vt0'
vv
PROPOSEO BULKHEAD v
PROPOSED
1O' BULKHEAD RETURN
PROPOSED TREE WELL #5
(276 SF F|LL)
DES-BCM
CRITICAL LINE
ANO EXISTING
SEAWALL
WELL #4
sF F|LL)
1 /2"
REBAR
FOUND
t
LOT 98
AARON P. SARAIHY
JENNIFER K. WALLACE
NAIL
IN
!.
NOT PARTICIPATING IN BULKHEAD REPLACEMENT
LOT 96
BERGMAN JOINT REV TRUST
FOUND
$ffiffi spH
ffiffiruffiffTHffiN
f
t
r 6'PA
LOT 94
JAN T. MCLAREN LIVING ]RUST
g"LO .
j {:pA 3O"LO'
@
S AN-LOTS 9+ 9B & 10c
AND COMMUNITY ACCTSS LOT
SCALT: 1:60
NOTE: THIS DRAWING lS FOR
PERMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PERFORN/ED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
PROPOSED: BULKHEAD
IYATERVUAY: DISTANT ISLAND CREEK
IN: BEAUFORT
couNTY oF: BEAUFORT, SC
REVIS|oN NO 2
SFIEET: 11 oF 16 DtilEz 8/22/2024
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERTY OI{I{ERS:
SEE SCHEDULE SHEET 16
FIGURE 11
PROPOSED SITE PLAN LOTS 94,98&1OO
AND COMMUNITY ACCESS LOT
1: 60o' 60' 120'
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC.
AGENT
McSWEENEY ENGINEERS. LLC
Itp r[' )r
o
FOUND
IN BULKHEAD
LOT 108
1 /2"
REBAR
NOT PARTICIPATING REPLACEMENT
BRICK
FIRE PIT
FOUND
DIST.
2021 MICHELLE N. GARDNER
REVOCABLE TRUST
DAVID SCOTT PROUT
REVOCABLE LIVING TRUST
FOUND
18"10.
22'O .
lXLo
?z'ro
WEA
LOT 106
RILEY LIVING TRUSTa"cH
16"0
TBMS
6'02" W 1
v
NAIL
1'
1 /2"
REBAR
[u',
R123 018 000 0768 0000
DISTANT ISLAND COMM. ASSOC. INC.
9
IN
25'0.
19;bhs
.1 8"O
J7,P^
v
NOT PARTICIPATING IN BULKHEAD REPLACEMENT
LOT 104
FAI'TII MCALHANEY HARPER
REVOC. TRUST
v
!,
*,
I
24"O.
31"1o
o42"LO
9"O
15'
NAIL IN
seA(verr
I
(i.
vv v
s 75'20'14"
*7.
PKF
u
12'
CREEK
*'ARs$GRNss
v
srN
o\s1FN1
rs$No
o?Pos\\\c
v
1O lO,BULKHEAD RETURN
v v
N
ig
NAIL
SEAWALL
s 80'51'16"
13.01
w E
PROPERTY BOUNDARY
PROPOSED BULKHEAO !,1
s v
PROPOSED TREE WELL #7
(124 SF F|LL)
i-R
sv
10'BULKHEAD RETURN
g -N
@
DISTANT ISLAND CREEK
-t350'
TO OPPOSING MARSHGRASS
{, v
iL
IMPACTS:
B=TdRFILL AND BEDDING
1323 ACRES
441 CUBIC YARDS
v J,'
10' BULKHEAD RETURU
NAIL IN
SEAWALL v
PROPOSEO IREE WELL #6
(294 SF F|LL)
'15
PROPOSED BULKHEAD
PROPERTY BOUNDARY FOUND
DES-BCM
CRITICAL LINE
AND EXISTING
SEAWALL
PROPOSED 'IREE WELL #5
(276 SF F|LL)
LOT 102
DONALD I. PRATT, JR.
GERALDINE O. PRATT
$ffiffi spffiffifiAt
v 26
ffiffiruffigTHffiN {s}
*,t
nl- FOUND
12'
v J9-Lo
v
PROPOSED SITE PLAN-LOTS 102 & 106
AND COMMUNITY ACCESS LOT
SCALT: 1:60
jlilr illl
NOTE: THIS DRAWING lS FOR
PERMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PERFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
PROPOSED: BULKHEAD
IIATERYUAY: DISTANT ISLAND CREEK
lN: BEAUFORT
COUNTY OF: BEAUFoRT, Sc
REVISION NO: 2
SFIEET: 12 oF 16 DAIET 8/22/2024
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW OITNERS:
SEE SCHEDULE SHEET 16
APPUCANT
DISTANT ISLAND COMM.
AGENT
McSWEENEY ENGINEER
100 & 102
S LOT
120'
RGURE 12
TE PLAN LOTS
MUNITY ACCES
1 60
60'0'
PROPOSED SI
AND COM
ASSOC., INC
S. LLC
(? ot- A7
-$4
l@l
e$
effi
&(ffi
e#
EM
H. BLAND
ldLA
'1t"t8:
N
w E
1 /2"
REBAR
FOUND
s
NOT PARTICIPATING IN BULKHEAD REPLACEMENT
LOT 114
DISTANT ISLANO CO. LP
FOUND
NOT PARTICIPANNG IN BULKHEAD REPLACEMENT
LOr 112
DISTANT ISLAND CO. LP
1 /2"
REBAR
8"1O11'PA
J1"uo
tsssoc
,onNR.".ot^tn
O\S1ANI
IN
12.PA
NOT PARTICIPATING IN BULKHEAD REPLACEMENT
LOT 110
s 77'02'49" W
12.56'
WLLIAM H. CHA]FIELD
ANNE U CHATFIELD
2A"LA
21'LA
NOT PARTICIPATING IN BULKHEAD REPLACEMENT
LOT108
2021 MICHELLE N. GARDNER
REVOCABLE TRUST
DAVID SCOTT PROUT
REVOCABLE LIVING IRUST
FOUND
1 /2"
REBAR
BRICK
PIT
FOUND
DIST.
,2"rc
iz"ro
ALL CRITICAL LINE INFORMATION
IS OBTAINED FRON/ A PLAT
PERFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
(9
v
PK
FOUND
& i&
v
*
iF
v
PK
FOUND
19
v v
1O' BULKHEAD
PROPOSED BULKHEAD
PROPERTY BOUNDARY
v
1O'BULKHEAD RETURN
v
v v L22
\O^
q\*
viL v
vrN
PKF
s 7520'14"
* 7.1
NEflI
h*@M
ffiEsffi
&
ffiffi
CRECK
o?PoS\\{G
iC
vrN
o\sIl*r
\SLANO i,
1O lO,BULKHEAD REN'RN
v v
v
NAIL
SEAWALL
PROPOSTD SITE PLAN
COMMUNITY ACCESS LOT
SCALE: 1:60
NOTE: THIS DRAWING lS FOR
PERMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
RGURE 13
OPOSED SITE PLAN
MUNITY ACCESS LO
APPIJCAUT
DISTANT ISLAND COMM. ASSOC., INC.
AGENT
McSWFFNFY FNGINEERS. LLC
60
60'
PR
coM T
1
120'o'
PROPOSED: BULKHEAD
WATERIYAY: DISTANT ISLAND CREEK
IN: BEAUFORT
COUNTY OF: BEAUFORT, SC
REVlSlOll NO: 2
SHEEI 13 oF 16 DATET 8/22/2024
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW OI{I'IERS:
SEE SCHEDULE SHEET 16
t( ac 07
27"Lo.v
vv
14
LOT 120
DISTANT ISLAND CO.
BOAT LANDINC
NO EXIS]ING
PRESENT.
PROPOSED
s BULKHEAD
v
v
s
*
I s"LO
19"1O
FLOAT
"Lo 26"10 191LO.
1 2"LO .
6"LO
21"LO . 12"PA
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PERFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
N
w E
s sffiffi ffipffiffiBAt
mmfiwffiHTHffiN(S)
1O'BULKHEAD RETURN
PROPERTY BOUNDARY
PROPOSED
BULKHEAD
FOUND
Dtsr.lL
vv
vv
i[ 4A' iL
.vv v
10, BULKHEAD RETURN
PROPERry BOUNDARY DES-B.M v {4
--Rp
E8B
CRITICAL LINE
AND EXISTING
SEAWALL
VjrV
s TACK IN
c
SEAWALL V
g
Cus
o{
v
v iL
v ik
^o PK
FOUND
v
PROPOSED SITt PLAN
BOAT LANDING
SCALE: 1: 6O
NOTE: THIS DRAWING lS FOR
PERMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
PROPOSED: BULKHEAD
TYATERTYAY: DISTANT ISLAND CREEK
IN: BEAUFORT
COUNW OF: BEAUFoRT, Sc
REVISION NO: 2
SHEEI 14 oF 16 DATEz 8/zz/2024
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW OlYl,lERS:
SEE SCHEDULE SHEET 16
EGIIELI.4
PROPOSED SITE PLAN- BOAT LANDING
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC.
AGENT
McSWEENEY ENGINEERS. LLC
0'
1: 60
60'
11 t? J?
CRITICAL LINE
PROPOSED
GRADE
18,' MAX.
sffiffi.$pffiffiHAt
-
EL VARIES
EXISTIN\,
ffiffiruffiHTHffiru(ffi?'
CLEAN GRANULAR
BACKFILL
aEBBox-r/r.w _
8'-15'
#57
GRA
GRANITE
VEL FILL
DEI/OLISH UPPER
HALF OF EXISTINC
BULKHEAD
TIMBER OR COI/POSITE
BULKHEAD
_ APPRoX._|VLW _
EXISTING
BULKHEAD
lrilIll
BULKHIAD SECTI ON
SCALT: 1:3
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW O$,|ERS:
SEE SCHEDULE SHEET 16
trGURE 15
BULKHEAD SECTION
1:3
3' 6'
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC
AGENT
McSWEENEY ENGINEERS. LLC
PROPOSED: BULKHEAD
WATERIYAY: DISTANT ISLAND CREEK
IN: BEAUFORT
COUNTY OF: BEAUFORT, Sc
REVISION NO: 2
SHEEI 15 oF 16 DATEI 8/zz/2o24
Xo a? 5f
ADJACENT PROPERTY TMS: OWNER ADDRESS:
1.
z.
3.
4.
6.
1,
9.
't0.
11.
12.
13.
14.
15.
'16.
17.
18.
Rl2J 018
R123 018
R12J 018
R123 018
R123 018
R123 018
R12J 018
R125 018
R123 018
R125 018
R123 018
R123 018
R123 018
R123 0i8
R123 018
Rl2J 018
R123 018
R125 018
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
0768
0650
0563
0637
0768
0581
06J8
0651
0768
0639
0653
076B
o592
0640
0768
0s33
0768
0666
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
1.
2.
4.
6.
DISTANT ISLAND CO LP
O,BRIANT JOHN SAMUEL JR
ROLFE ROBERT C ROLFE DIANE C
NATHAN K SMITH REV TRUST OF 2OO8 SMITH
ZACHARY DIXON
DISTANT ISLAND CO LP
SCANDLEN BENJAMIN BLAKE, SCANDLEN
AMANDA ALICE
KATHRYN K SMOKE TRUST
YARALIAN ZAVAN YARALIAN, LORRAINE M
DISTANT ISLAND CO LP
JAN T MCLAREN LIVNG TRUST
SARATHY AARON P WALLACE, JENNIFER K
DISTANT ISLAND CO LP
EVANS GEORGE F
PRATT DONALD I JR PRATT, GERALDINE O
DISTANT ISLAND CO LP
RILEY LIVING TRUST
DISTANT ISLAND CO LP
DISTANT ISLAND COMMUNITY ASSOC INC
1. 47O DISTANT ISLAND
2, 53O DISTANT ISLAND
3. 540 DISTANT ISLAND
4, 550 DISTANT ISLAND
5, 47O DISTANT ISLAND
6. 560 DISTANT ISLAND
7, 57O DISTANT ISLAND
8. 580 DISTANT ISLAND
9. 47O DISTANT ISLAND
10. 590 DISTANT ISLAND
11. 610 DISTANT ISLAND
12. 470 DISTANT ISLAND
13. 620 DISTANT ISLAND
14. 630 DISTANT ISLAND
15. 470 DISTANT ISLAND
16. 650 DISTANT ISLAND
17. 470 DISIANT ISLAND
18. 720 DISTANT ISLAND
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
7.
9.
10.
tt.
12.
13.
14.
15.
to.
17.
t6.
!tttntD.
f tt t
SHH $Pffi#HAt
ffiffitrwffisTffffiru{S}
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW OWiIERS:
SEE SCHEDULE SHEET 16
ADJACENT P
FIGURE 16
ROPERTY OWNERS MAP
SCALE: NTS
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC.
AGENT
EY ENGINEERS, LLCMcSWEEN
PROPOSED: BULKHEAD
WAIERWAY: DISTANT ISLAND CREEK
IN: BEAUFORT
COUNW OF: BEAUFORT, Sc
REVlSlO,l NO 2
SHEEI 16 oF 16 DATEz 6/22/2024
At oP 3-l
ffiffiffi ffipffiffiHAL
ffiffiruffiflTfiffiru{s}
A-/l)
9-|t
q.7
J
:l:
f,
X
D<
cg
&
E
o
@rri r:
o.
TRET
NOTES:
i.) E &* \;! SSi 4SEN
^E M.aD 6 vrrr & $r*i rc fAL .1ls'm,
' E fficE oR *s4 d US. AW 6Edtuqs,isscJ|rutuM3) lrM t.Nil:.t@no{3ss c@sMt 4s..i &81 tr L'{i.e@nD ffi Ae[ ftc sGMMS NY M A' ST dflNd$ ..s FJ RRE$W A ffi WO oN @ .@6!NS ilLY & 6 NoIE WU 0F a m! $Nr6) CAmCAI&S & rcr F1 16S rc d 'Er*rHrumE 0R #sounr s*.z) l{ aaml@ 4 Mr rMmE ffi €a 16T-, ":J
b ffi@ft IHE dffict d $NM'tod d ,,.offi M. w I {ffii lr"r'sr ro*cNts@@sMlffis6 r ffimuro i'r '{: sft' E#e tu00 r€s ffiMlh x6& r'r &8MilUN6CGru9,)ESamSEffirirg.imsMSt' ftE W ffiL drt wi€ 4@r'l N sffildil{8ffffin'llMRm&ilrffiDrExM#''sffi'd' L e'. t'EL 13' & € e ri S kj{ru,}b Er.4r Elu cw-td N& &r3&rt9 Ms 9&3I. 2e1. {im &?:r'.) 6mq NRA € f-1etwcl- gluY rs ,s M0
6$lqs
l-'
v'
I
turtrfflsmrsm
u ffi t"3 PAol 1to
ro.Fr fl do e.a?-@ ***,r. t-l-,.
NEDffi2SK5'5
rt,ry d rl! N0 f@*c
tuT 9* rr trE 17J
mMwn'ffi
u&
MrFrn6|!r(4!dF,*
SHIIT 1
z)
i)
a
&)
7)
&l
s)
u!frmrffiaEffiLtffi@ dottc 1., s@E62sffi$t
W&SSD':@N@UF
tu_ w !r3 P|GE 17'
urftHsDcrclecM.M$.M@@*r49r7
tuislNNuis&F, 1N
ill &W t23 P&S t9!
dT tr E UNO Ng.M ffiF
Mffi 'ra41U6i d M uilD dMM CmF
ss etw $. 2@7
e,lt 3@ zga Pr€ sa
,?r tY &q# a 6asB, E,5:D #:[+( rai ?o10
ul sK 1!r FM ls
GASqUE
tN{D
& ASSOCIATES TNC.
ST'EVEYOX*I PLANNERS
shhrS416' E&lBlmNbmPn&astu roaH I&{ t &6)
&!hlffi:ffilUUtOb.S
TREE AND TOPOGRAPHICAL SURVEY
LOTS 80-118 DISTANT ISLAND
FREPARED FOR
MCSfEENEY ENGINEERS, tLC
DISTANT ISIAND
BEAUFORT COUNTY_**--SOTTTH CAROIINA
anfE 1l24t2nr1 saAF 1"=3C'
€*is#7liiii,.,':Jpiirro ccr pER o ,r.:-ocRMqiv$E) 7/15/2O2.-JPDATED CCL PER DES-BCM
=q6l:l- d*dF6
Uf O @'ss'u,@6r,v;.*d6
4 WF-$& Vi@ d@E affon SC.3, mx rs, ffi. tc(e) Q-1ro
MSMG*Effidlffiffi&4
,s-)(N.LOCAriir:
ffiffiffi ffifi*ffiffitrAtu
#ffi}ruffiHTtrffitrd
#€bqa"
e#
Itw
I
T)
L)J
oI gyMBols &
a
,clt
't:
tr
D<
Xo
'a-Ffii1E ffiSrt-- iil Pnc 54a
+
r/2!ROt SCT
t"-.*
LBEEI{S
BEAUFORT COUNTY-----SOUTH CAROLINA
GASQ{IE
talrD
& ASSOCIATAS INC.
SI'BIEYORS PIINIIEXtI /fr '//,///
OATE 1124/2A23 SCALE 1"=.10'
RF/|SED 5/3CI2324-UPOA-ED CCL FEC iIEC-C-lH
REVTSED 7/'3/2124-!PETD CCL PER 5:1 BCv
23 f:itr \). vlK o(F.i. 9t lls, ##', 53,
(sr) s-jru
qEffi@ryllq64
' L die d; rL!
s€c;r-Eii:
sHt[T 2 0r 6 4rDG ratlo 4
Sffiffi $PHCFAL
ffiffi$-$ffi$Tfrffiru{s}
eJ
_9
9-rF
qr
J
./i ](
Dri !!u1- r FiEslAL
@.1
l1 cl
Xo
a"*,*
I
I
LCam\ rrip (N.T"S.)
I
NOTM: li
1
.t
;l\i
I
!r
tu n€ M6 $dN aFEoN aa v!Ki:
Aro { -:ilE qecT p l.e ArTgituN.
1.) il6 e-q) q.r rcr HF
a) {_ edIec6wM* ffiuE moo.{) rif,4s 0r uxMD 6LG ,}: mc *irtl
t)n4ut@MAwn\ffiqnEliuREUEngl SLY @ g W H €,!r OF
^
lru sffi.
6-) cFrql$s e sr !l@ ro sm{.Mt,"rEI3*5ffiUffiffi.z) sE cwF! !s v hM@ oR s Nm
10 ffir1'r '-: tffi m ffid s at@idY 0n14lc ,8 &r lffi. ilUffi. il@.cssd Pf,lir* c\ &!@ Effi.& q& av :{ra vr 4 6ffi s fl6 j:r
6 9R$ tffi zs ilFOMmX B1 f 6ni' hRor& ari-s6 grf, @&rl ffi.s.-t x 6 Pe Ff,- * @ 40 GI d\Sm "r:{ OtrrqL effi E*E PUMS: AD C{
srcil o! ffi@m-
1!.) 1: riFLS ffi b S N R1S &M a'S-rC-r,'f & n. 1i a. r. r af L rr' s Mf,vNif, .*Ftu4 t.q mN-!r,,f( drqn srst6 s@ stlr2I Ar. ,1r'rm)r],j6.M ^14r1.rzJwre uflv a ;s Mm
,'',? t
I
J)
1) res f,zr sr6 06 o7s loo (Nm tr)t$,s.rlloiam@mTr{9 hrt3 0r& cb ffi 0&ld,s R!2S ora 60 6:7 iai
Y.U& frA Ot8 can 6el @,
r*3 Rl2! O:l ffi o.rt :srJr.!s RrE ota m s9 a*rri Rla u6 an & ,,#tu3. Rl- Ola @ @ i$:i
I!, h., ora &, tr.o &
r-!s hir 016 m 63 m
1 ls Ard dra d o:rz dmTJ,s Rt8 0!3 fr r.-b M1,_r ara or3 6 i:ir @
I
I
I
!-l
a
{)
1i
3.)
9,)
POT H N UM @NS'LIM GRF 4,.
EE
rg
nItul ft Hd R60RE CMme6 t*M... x6
m @. @s '$ 955
fuI B NE b\O g@TN llM
turflfrtNcMffit_!ruulo d$F 10. il7xs ffi ras PME 9t7
ui g wD coE4w cff, fc
F/r t* ris Fd 172
FJr d li d{0 cosuLTRe @p6r*,. JSrd f,q m7N @K Z4A PE {6
bre ME&,.sffim. ',.
&r s 1lr Pffi 1a
TREE AND TOPOGRAPHICAL SURVEY
LOTS BO-118 DISTANT ISLAND
PREPARED FOR
MCS'IfEENEY ENGINEERS, LtC
DISTANT ISLAND
BEIUFORT COUN-TT-----SOUTH CABOLI],IA
\aJF 1b4/ro)1 saatF ]"=JO'
c'm-srij lr7:07112+iJpii':.' ccr ):-R DHEc-ocRr.'
Rd s:t; 7/15/ ;ilq-uPM-Ei ccL r:R oEs-Bcu
fierlw*mrurc.G*M w*saFuq&
'ffiqffi,tffitqary6w// //1.',.,,' .- d /.2/
AASqUE & ASSOCHTES INC.
IA}ID SUFYEYCES PI.ANNE}S
2A trGrdy!{ \M cnc.E. FUFcq, s.cp.o. 6s rw\ sworT. si,(s9 5r2-r7r3
Mda&l1@416ru*Effidffimrsfiwe
t:rc-l UEil6 srttT I c[ 6 -.4r3r.f&r6eHe/r!4MF6
SrHffi Sf#ffi#Hdqfu
#ffi)Fdffi$Tff#frd
"4Fq'!'s
R&#-
t-r.4
I
-t('5
I
OT SYMBOLS &
!
6-F
p.
NTP
xxv
D< MNIOIR LIE
*t
"o
n *o .*^'*
@!6rrauqNMtsNM
F{NrcMfl@
t
q
CASQUS & ASSOCIATES INC.
IIINI) SDf,YEYONS PilfiNRS
I ruESO&lWro, AM&. SCro. M 1st, 8sF, 5,c
(s$il-la
E*itsiF.sctsE;.Efe
TREE AND TOPOGRAPHICAL SUR,VEY
LOTS BO-118 DISTANT ISLAND
PREPARED FOR
MCSWEENEY ENGINEERS, LtC
DISTANT I$LAND
BEAUFORT COUNTY----_SOUTH CAROUNA
DaIE t/24/2O23 SCA[! l"-3O'
REV,SED 5/30,/2024-'JPDATED cCL PsR DHEC-CCRM
I€iliED 7/15/2O24-JPDATED CCL PER DS-BCM
deffiarw!*84
iiilt-i;rc SHEIT 4 CF 6
sffiffi spffiffi$Atu
ffiffiF#ffiFT$ffift#{s}
l-)C
o.ri>
Q)
J
tt(
f,F
D<
o,s
trca
_ cBtfi urE
*' * "'"'t *^"*
Dl rk
44
I
3n
t
GASQIIE
I.AND
& ASSOCIATES INC.
AURVEYORS PIINNERS
TREE AND TOPOGRAPHICAL SURVRY
LOTS BO_118 DISTANT ISLAND
FRSPARED T'OR
MCSWEENEY ENGINEERS, LLC
DISTANT ISTAND
BEAUFOBT COUNTY-.---SOUTH CABOLINA
DATE i/24/2023 scALE l"-io'
Rs/tsD sj\t/zcz1-uplAr€D cc! pER DHEc-ocRv
RE\{S€D 7115,/2C22-U-}"ED CCL PER DES-BCLj
aRSMi|lMO*L!,ffi{d!,Pr, g lxq @r€, $.(s) 52-'El
wsm@ flEFr# sHr[T 5 0r 6 @rJrd rt,'o * ilE/r 5fr d.
sffi,H Rffim\Ll$r iJ ti-_j.i4ri
ffi$,&fu
ffi#Fdffi#Fs_*aEtr. ffiru
l-)J
a
t->
r.-)
J
&
F
B
X
X
F€r !, i^. E rh6rr&T Owft4i 2uF cstu*ilE Eclqrr L GFER st- stui G --rAEi v^L* i
os ytE
slE trit€R
-a**
LoCATi::\ MAp (N_LS.)
1.)
?.)
4.1
:)
..1
J,i
c)
r.)
)!.l
4
.fl
e)
I)
-l
4)
5;
1.)
s
a)
sl ?REE AND ?OPOGNAPIIICAT SURVEYLOTS BO_118
PBEPAAED FOR
:I{CS}YEENEY ENGINEERS, tLC
_ DISTAM ISL{NDauruFoRT c0ul{Ty_____s0uTH c.{RotL\A
i$!#3i#f#fi #iiE: rn g*=,m*
se-"e+Y:,x,I*H6FiS
6 @!rB r!1r@. h,v{ oe r, h
%f;*-J SHEI- 6 O
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS, CHARLESTON DISTRICT
69A HAGOOD AVENUE
CHARLESTON, SOUTH CAROLINA 29403-5107
January 17, 2025
Regulatory Division
Mr. Ashley Twombley
Distant Island Community Association, Inc.
311 Carteret St
Beaufort, South Carolina 29907
twombley@twlawfirm.com
Dear Mr. Twombley:
This is in response to a Pre-Construction Notification (PCN) (SAC-2002-14958)
received on June 18, 2024, and considered complete on July 24, 2024. In submitting
the PCN, you requested verification the proposed project is authorized by a Department
of the Army (DA) Nationwide Permit (NWP).
The work affecting waters of the United States is part of an overall project known as
Distant Island Bulkhead. The activities in waters of the United States include the
maintenance and repair of 1,565 linear feet of bulkhead and seven tree wells. The
project involves impacts to not more than 0.03-acre of waters of the United States.
Specifically, this letter authorizes impacts to 0.03-acre of Distant Island Creek. The
project is located on Distant Island Road, Beaufort, Beaufort County, South Carolina
(Latitude: 32.3812 °, Longitude: -80.6412 °). The PCN also includes the following
supplemental information:
a. Drawing sheets ex. 1-16 of 16 titled “Proposed: Bulkhead" and dated June 12,
2024.
Based on a review of the PCN, including the supplemental information indicated
above, the Corps has determined the proposed activity will result in minimal individual
and cumulative adverse environmental effects and is not contrary to the public interest.
Furthermore, the activity meets the terms and conditions of NWP 3 Maintenance.
For this authorization to remain valid, the project must comply with the enclosed
NWP General Conditions, Charleston District Regional Conditions, and the following
special conditions:
a. That impacts to aquatic areas do not exceed those specified in the above
mentioned PCN, including any supplemental information or revised permit
drawings that were submitted to the Corps by the permittee.
2
b. That the construction, use, and maintenance of the authorized activity is in
accordance with the information given in the PCN, including the
supplemental information listed above, and is subject to any conditions or
restrictions imposed by this letter.
c. That the permittee shall submit the attached signed compliance
certification to the Corps within 30 days following completion of the
authorized work.
d. Prior to beginning the authorized work, the permittee must coordinate with
the local NFIP flood plain manager and comply with FEMA requirements. A
list of NFIP floodplain managers may be found at:
https://www.dnr.sc.gov/water/flood/index.html.
e. That the permittee shall use only clean fill material obtained from an upland
source.
f. That the permittee shall incorporate Best Management Practices (BMPs)
during construction to protect adjacent wetlands and Waters of the United
States from sediment and erosion during construction. BMPs to be utilized,
independently or in combination, may include but are not limited to;
erosion control matting, mulch, silt fences, sediment tubes, and other
devices. BMPs shall be maintained until the fill material is stabilized.
g. The permittee understands and agrees that, if future operations by the
United States require the removal, relocation, or other alteration, of the
structure or work herein authorized, or if, in the opinion of the Secretary of
the Army or their authorized representative, said structure or work shall
cause unreasonable obstruction to the free navigation of the navigable
waters, the permittee will be required, upon due notice from the Corps of
Engineers, to remove, relocate, or alter the structural work or obstructions
caused thereby, without expense to the United States. No claim shall be
made against the United States on account of any such removal or
alteration.
h. Use of the permitted activity must not interfere with the public's right to
free navigation on all navigable waters of the U.S.
i. The permittee must install and maintain, at their expense, any safety lights
and signals prescribed by the U.S. Coast Guard (USCG), through
regulations or otherwise, on authorized facilities. The USCG may be
reached at the following address and telephone number: (as of February
2013) U. S. Coast Guard District Seven, Waterways Management Branch,
3
909 SE 1st Ave, Suite 406, Miami, FL. 33131, and 305-415-6755 or 305-415-
6750.
j. In order to ensure protection of any threatened or endangered species, and
designated critical habitat that may be present in the vicinity of the project
area during construction activities, the permittee will comply with the
following:
1. The permittee shall instruct all personnel associated with the project
of the potential presence of and the need to avoid collisions with protected
species, which may include but is not limited to West Indian manatees,
Atlantic sturgeon, shortnose sturgeon, sea turtles, wood stork, blue whale,
fin whale, humpback whale, North Atlantic right whale, sei whale and sperm
whale.
2. The permittee shall advise all construction personnel that there are
civil and criminal penalties for harming, harassing, or killing protected
species, to include manatee(s), which are protected under the Marine
Mammal Protection Act of 1972 and/or the Endangered Species Act of 1973.
3. Any siltation barriers used during the project shall be made of
material in which protected species, to include manatee(s), cannot become
entangled and must be properly secured, and regularly monitored to avoid
protected species entrapment.
4. All vessels associated with the project shall operate at "no
wake/idle" speeds at all times while in the construction area and while in
water where the draft of the vessel provides less than a four-foot clearance
from the bottom. All vessels will follow routes of deep water whenever
possible.
5. If protected species, to include manatee(s), are seen within 100 yards
of the active construction area all appropriate precautions shall be
implemented to ensure protection of the protected species, to include
manatee(s). These precautions shall include the operation of all moving
equipment no closer than 50 feet to a protected species, to include
manatee(s). Operation of any equipment closer than 50 feet to a protected
species, to include manatee(s), shall necessitate immediate shutdown of
that equipment. Activities will not resume until the protected species, to
include manatee(s), has departed the project area of its own volition.
6. Incidents where any individuals of sea turtles, Atlantic sturgeon,
shortnose sturgeon, blue whale, fin whale, humpback whale, North Atlantic
right whale, sei whale and sperm whale listed by NOAA Fisheries under the
4
Endangered Species Act appear to be injured or killed as a result of
discharges of dredged or fill material into waters of the United States or
structures or work in navigable waters of the United States authorized by
this DA permit shall be reported to NOAA Fisheries, Office of Protected
Species at (727) 824-5312, the SCDNR Hotline at 1-800-922-5431, and the
Regulatory Office of the Charleston District of the U.S. Army Corps of
Engineers at (843) 329-8044. The finder should leave the animal alone,
make note of any circumstances likely causing the death or injury, note the
location and number of individuals involved and, if possible, take
photographs. Adult animals should not be disturbed unless circumstances
arise where they are obviously injured or killed by discharge exposure, or
some unnatural cause. The finder may be asked to carry out instructions
provided by NOAA Fisheries, Office of Protected Resources, to collect
specimens or take other measures to ensure that evidence intrinsic to the
specimen is preserved.
7. The permittee understands and agrees that all in-water lines (rope,
chain, and cable, including the lines to secure turbidity curtains) must be
stiff, taut, and non-looping. Examples of such lines are heavy metal chains
or heavy cables that do not readily loop and tangle. Flexible in-water lines,
such as nylon rope or any lines that could loop or tangle, must be enclosed
in a plastic or rubber sleeve/tube to add rigidity and prevent the line from
looping and tangling. In all instances, no excess line is allowed in the
water. Where appropriate, in water wires should be fitted with PVC sleeve
from the surface to the bottom to prevent any potential scraping of the
passing manatees.
k. In order to ensure protection and reduce potential construction-related
impacts to West Indian manatees that may be in the vicinity of the project
area during construction activities, to discountable and insignificant levels,
the permittee will comply with the following for all projects affecting the
coastal waters of South Carolina:
1. The permittee shall instruct all personnel associated with the project
of the potential presence of manatees and the need to avoid collisions with
manatees. All construction personnel MUST monitor water-related
activities for the presence of manatee(s).
2. Any collision with and/or injury to a manatee shall be reported
immediately to the U.S. Fish and Wildlife Service contacts: Melanie Olds,
South Carolina Manatee Lead, Charleston Field Office, at 843-727-4707 ext.
205; or Terri Calleson, Manatee Recovery Coordinator, North Florida Field
Office, at 904-731-3286.
5
This verification is valid until March 14, 2026, unless the district engineer modifies,
suspends, or revokes the NWP authorization in accordance with 33 CFR 330.5(d). If
prior to this date, the NWP authorization is reissued without modification or the activity
complies with any subsequent modification of the NWP authorization, the verification
continues to remain valid until March 14, 2026. If you commence, or are under contract
to commence this activity before the NWP expires, or the NWP is modified, suspended,
or revoked by the Chief of Engineers or division engineer in accordance with 33 CFR
330.5(b) or (c), respectively, in such a way that the activity would no longer comply with
the terms and conditions of the NWP, you will have 12 months after the date the NWP
expires or is modified, suspended, or revoked, to complete the activity under the
present terms and conditions of this NWP.
This NWP is verified based on information you provided. It is your responsibility to
read the attached NWP(s) along with the General, Regional, and Special Conditions
before you begin work. If you determine your project will not be able to meet the NWP
and the conditions, you must contact the Corps before you proceed. Enclosed you will
also find a copy of the Coastal Zone Management special conditions which are
conditions of your authorization under Nationwide Permit NWP 3 Maintenance. If you
have questions concerning compliance with the conditions of the Coastal Zone
Management concurrence, you should contact the South Carolina Department of
Environmental Services (SCDES).
In all future correspondence, please refer to file number SAC-2002-14958. A copy of
this letter is forwarded to State and/or Federal agencies for their information. If you
have any questions, please contact Brittany Pittman, Project Manager, at 843-329-
8046, or by email at Brittany.F.Pittman@usace.army.mil.
Sincerely,
Carl Johnson
Team Lead
Attachments
Permit Drawings
Nationwide Permit 3 General Conditions
Nationwide Permit Regional Conditions
Coastal Zone Management Consistency Certification
Compliance Certification Form
6
Copies Furnished:
Mr. William Oriani
McSweeney Engineers
300 West Coleman Blvd. Suite 203B
Mount Pleasant , South Carolina 29464
hunter@mcsweeneyengineers.com
SCDES – Bureau of Coastal Management
1362 McMillan Avenue, Suite 400
North Charleston, South Carolina 29405
OCRMPermitting@des.sc.gov
SCDES-Bureau of Water
2600 Bull Street
Columbia, South Carolina 29201
WQCWetlands@des.sc.gov
US Coast Guard
Sector Charleston
Attention: Waterways Management
1050 Register Street
North Charleston, SC 29405
D07-PF-SECTORCHASN-WWM@uscg.mil
SAC-2002-14958
SAC-2002-14958
SAC-2002-14958
SAC-2002-14958
SAC-2002-14958
SAC-2002-14958
SAC-2002-14958
SAC-2002-14958
SAC-2002-14958
SAC-2002-14958
SAC-2002-14958
SAC-2002-14958
SAC-2002-14958
SAC-2002-14958
SAC-2002-14958
SAC-2002-14958
3. Maintenance. (a) The repair, rehabilitation, or replacement of any previously
authorized, currently serviceable structure or fill, or of any currently serviceable
structure or fill authorized by 33 CFR 330.3, provided that the structure or fill is not to be
put to uses differing from those uses specified or contemplated for it in the original
permit or the most recently authorized modification. Minor deviations in the structure's
configuration or filled area, including those due to changes in materials, construction
techniques, requirements of other regulatory agencies, or current construction codes or
safety standards that are necessary to make the repair, rehabilitation, or replacement
are authorized. This NWP also authorizes the removal of previously authorized
structures or fills. Any stream channel modification is limited to the minimum necessary
for the repair, rehabilitation, or replacement of the structure or fill; such modifications,
including the removal of material from the stream channel, must be immediately
adjacent to the project. This NWP also authorizes the removal of accumulated
sediment and debris within, and in the immediate vicinity of, the structure or fill. This
NWP also authorizes the repair, rehabilitation, or replacement of those structures or fills
destroyed or damaged by storms, floods, fire or other discrete events, provided the
repair, rehabilitation, or replacement is commenced, or is under contract to commence,
within two years of the date of their destruction or damage. In cases of catastrophic
events, such as hurricanes or tornadoes, this two-year limit may be waived by the
district engineer, provided the permittee can demonstrate funding, contract, or other
similar delays.
(b) This NWP also authorizes the removal of accumulated sediments and debris outside
the immediate vicinity of existing structures (e.g., bridges, culverted road crossings,
water intake structures, etc.). The removal of sediment is limited to the minimum
necessary to restore the waterway in the vicinity of the structure to the approximate
dimensions that existed when the structure was built, but cannot extend farther than 200
feet in any direction from the structure. This 200 foot limit does not apply to
maintenance dredging to remove accumulated sediments blocking or restricting outfall
and intake structures or to maintenance dredging to remove accumulated sediments
from canals associated with outfall and intake structures. All dredged or excavated
materials must be deposited and retained in an area that has no waters of the United
States unless otherwise specifically approved by the district engineer under separate
authorization.
(c) This NWP also authorizes temporary structures, fills, and work, including the use of
temporary mats, necessary to conduct the maintenance activity. Appropriate measures
must be taken to maintain normal downstream flows and minimize flooding to the
maximum extent practicable, when temporary structures, work, and discharges of
dredged or fill material, including cofferdams, are necessary for construction activities,
access fills, or dewatering of construction sites. Temporary fills must consist of
materials, and be placed in a manner, that will not be eroded by expected high flows.
After conducting the maintenance activity, temporary fills must be removed in their
entirety and the affected areas returned to pre-construction elevations. The areas
affected by temporary fills must be revegetated, as appropriate.
(d) This NWP does not authorize maintenance dredging for the primary purpose of
navigation. This NWP does not authorize beach restoration. This NWP does not
authorize new stream channelization or stream relocation projects.
Notification: For activities authorized by paragraph (b) of this NWP, the permittee must
submit a pre-construction notification to the district engineer prior to commencing the
activity (see general condition 32). The pre-construction notification must include
information regarding the original design capacities and configurations of the outfalls,
intakes, small impoundments, and canals. (Authorities: Section 10 of the Rivers and
Harbors Act of 1899 and Section 404 of the Clean Water Act (Sections 10 and 404))
Note: This NWP authorizes the repair, rehabilitation, or replacement of any previously
authorized structure or fill that does not qualify for the Clean Water Act Section 404(f)
exemption for maintenance.
Nationwide Permit General Conditions
Note: To qualify for NWP authorization, the prospective permittee must comply with the
following general conditions, as applicable, in addition to any regional or case-specific
conditions imposed by the division engineer or district engineer. Prospective permittees
should contact the appropriate Corps district office to determine if regional conditions
have been imposed on an NWP. Prospective permittees should also contact the
appropriate Corps district office to determine the status of Clean Water Act Section 401
water quality certification and/or Coastal Zone Management Act consistency for an
NWP. Every person who may wish to obtain permit authorization under one or more
NWPs, or who is currently relying on an existing or prior permit authorization under one
or more NWPs, has been and is on notice that all of the provisions of 33 CFR 330.1
through 330.6 apply to every NWP authorization. Note especially 33 CFR 330.5 relating
to the modification, suspension, or revocation of any NWP authorization.
1. Navigation. (a) No activity may cause more than a minimal adverse effect on
navigation.
(b) Any safety lights and signals prescribed by the U.S. Coast Guard, through
regulations or otherwise, must be installed and maintained at the permittee's expense
on authorized facilities in navigable waters of the United States.
(c) The permittee understands and agrees that, if future operations by the United States
require the removal, relocation, or other alteration, of the structure or work herein
authorized, or if, in the opinion of the Secretary of the Army or his or her authorized
representative, said structure or work shall cause unreasonable obstruction to the free
navigation of the navigable waters, the permittee will be required, upon due notice from
the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions
caused thereby, without expense to the United States. No claim shall be made against
the United States on account of any such removal or alteration.
2. Aquatic Life Movements. No activity may substantially disrupt the necessary life cycle
movements of those species of aquatic life indigenous to the waterbody, including those
species that normally migrate through the area, unless the activity's primary purpose is
to impound water. All permanent and temporary crossings of waterbodies shall be
suitably culverted, bridged, or otherwise designed and constructed to maintain low flows
to sustain the movement of those aquatic species. If a bottomless culvert cannot be
used, then the crossing should be designed and constructed to minimize adverse
effects to aquatic life movements.
3. Spawning Areas. Activities in spawning areas during spawning seasons must be
avoided to the maximum extent practicable. Activities that result in the physical
destruction (e.g., through excavation, fill, or downstream smothering by substantial
turbidity) of an important spawning area are not authorized.
4. Migratory Bird Breeding Areas. Activities in waters of the United States that serve as
breeding areas for migratory birds must be avoided to the maximum extent practicable.
5. Shellfish Beds. No activity may occur in areas of concentrated shellfish populations,
unless the activity is directly related to a shellfish harvesting activity authorized by
NWPs 4 and 48, or is a shellfish seeding or habitat restoration activity authorized by
NWP 27.
6. Suitable Material. No activity may use unsuitable material (e.g., trash, debris, car
bodies, asphalt, etc.). Material used for construction or discharged must be free from
toxic pollutants in toxic amounts (see section 307 of the Clean Water Act).
7. Water Supply Intakes. No activity may occur in the proximity of a public water supply
intake, except where the activity is for the repair or improvement of public water supply
intake structures or adjacent bank stabilization.
8. Adverse Effects From Impoundments. If the activity creates an impoundment of
water, adverse effects to the aquatic system due to accelerating the passage of water,
and/or restricting its flow must be minimized to the maximum extent practicable.
9. Management of Water Flows. To the maximum extent practicable, the pre-
construction course, condition, capacity, and location of open waters must be
maintained for each activity, including stream channelization, storm water management
activities, and temporary and permanent road crossings, except as provided below. The
activity must be constructed to withstand expected high flows. The activity must not
restrict or impede the passage of normal or high flows, unless the primary purpose of
the activity is to impound water or manage high flows. The activity may alter the pre-
construction course, condition, capacity, and location of open waters if it benefits the
aquatic environment (e.g., stream restoration or relocation activities).
10. Fills Within 100-Year Floodplains. The activity must comply with applicable FEMA-
approved state or local floodplain management requirements.
11. Equipment. Heavy equipment working in wetlands or mudflats must be placed on
mats, or other measures must be taken to minimize soil disturbance.
12. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls
must be used and maintained in effective operating condition during construction, and
all exposed soil and other fills, as well as any work below the ordinary high water mark
or high tide line, must be permanently stabilized at the earliest practicable date.
Permittees are encouraged to perform work within waters of the United States during
periods of low-flow or no-flow, or during low tides.
13. Removal of Temporary Structures and Fills. Temporary structures must be
removed, to the maximum extent practicable, after their use has been discontinued.
Temporary fills must be removed in their entirety and the affected areas returned to pre-
construction elevations. The affected areas must be revegetated, as appropriate.
14. Proper Maintenance. Any authorized structure or fill shall be properly maintained,
including maintenance to ensure public safety and compliance with applicable NWP
general conditions, as well as any activity-specific conditions added by the district
engineer to an NWP authorization.
15. Single and Complete Project. The activity must be a single and complete project.
The same NWP cannot be used more than once for the same single and complete
project.
16. Wild and Scenic Rivers. (a) No NWP activity may occur in a component of the
National Wild and Scenic River System, or in a river officially designated by Congress
as a “study river” for possible inclusion in the system while the river is in an official study
status, unless the appropriate Federal agency with direct management responsibility for
such river, has determined in writing that the proposed activity will not adversely affect
the Wild and Scenic River designation or study status.
(b) If a proposed NWP activity will occur in a component of the National Wild and Scenic
River System, or in a river officially designated by Congress as a “study river” for
possible inclusion in the system while the river is in an official study status, the
permittee must submit a pre-construction notification (see general condition 32). The
district engineer will coordinate the PCN with the Federal agency with direct
management responsibility for that river. Permittees shall not begin the NWP activity
until notified by the district engineer that the Federal agency with direct management
responsibility for that river has determined in writing that the proposed NWP activity will
not adversely affect the Wild and Scenic River designation or study status.
(c) Information on Wild and Scenic Rivers may be obtained from the appropriate
Federal land management agency responsible for the designated Wild and Scenic River
or study river (e.g., National Park Service, U.S. Forest Service, Bureau of Land
Management, U.S. Fish and Wildlife Service). Information on these rivers is also
available at: http://www.rivers.gov/.
17. Tribal Rights. No activity or its operation may impair reserved tribal rights, including,
but not limited to, reserved water rights and treaty fishing and hunting rights.
18. Endangered Species. (a) No activity is authorized under any NWP which is likely to
directly or indirectly jeopardize the continued existence of a threatened or endangered
species or a species proposed for such designation, as identified under the Federal
Endangered Species Act (ESA), or which will directly or indirectly destroy or adversely
modify designated critical habitat or critical habitat proposed for such designation. No
activity is authorized under any NWP which “may affect” a listed species or critical
habitat, unless ESA section 7 consultation addressing the consequences of the
proposed activity on listed species or critical habitat has been completed. See 50 CFR
402.02 for the definition of “effects of the action” for the purposes of ESA section 7
consultation, as well as 50 CFR 402.17, which provides further explanation under ESA
section 7 regarding “activities that are reasonably certain to occur” and “consequences
caused by the proposed action.”
(b) Federal agencies should follow their own procedures for complying with the
requirements of the ESA (see 33 CFR 330.4(f)(1)). If pre-construction notification is
required for the proposed activity, the Federal permittee must provide the district
engineer with the appropriate documentation to demonstrate compliance with those
requirements. The district engineer will verify that the appropriate documentation has
been submitted. If the appropriate documentation has not been submitted, additional
ESA section 7 consultation may be necessary for the activity and the respective federal
agency would be responsible for fulfilling its obligation under section 7 of the ESA.
(c) Non-federal permittees must submit a pre-construction notification to the district
engineer if any listed species (or species proposed for listing) or designated critical
habitat (or critical habitat proposed such designation) might be affected or is in the
vicinity of the activity, or if the activity is located in designated critical habitat or critical
habitat proposed for such designation, and shall not begin work on the activity until
notified by the district engineer that the requirements of the ESA have been satisfied
and that the activity is authorized. For activities that might affect Federally-listed
endangered or threatened species (or species proposed for listing) or designated critical
habitat (or critical habitat proposed for such designation), the pre-construction
notification must include the name(s) of the endangered or threatened species (or
species proposed for listing) that might be affected by the proposed activity or that
utilize the designated critical habitat (or critical habitat proposed for such designation)
that might be affected by the proposed activity. The district engineer will determine
whether the proposed activity “may affect” or will have “no effect” to listed species and
designated critical habitat and will notify the non-Federal applicant of the Corps’
determination within 45 days of receipt of a complete pre-construction notification. For
activities where the non-Federal applicant has identified listed species (or species
proposed for listing) or designated critical habitat (or critical habitat proposed for such
designation) that might be affected or is in the vicinity of the activity, and has so notified
the Corps, the applicant shall not begin work until the Corps has provided notification
that the proposed activity will have “no effect” on listed species (or species proposed for
listing or designated critical habitat (or critical habitat proposed for such designation), or
until ESA section 7 consultation or conference has been completed. If the non-Federal
applicant has not heard back from the Corps within 45 days, the applicant must still wait
for notification from the Corps.
(d) As a result of formal or informal consultation or conference with the FWS or NMFS
the district engineer may add species-specific permit conditions to the NWPs.
(e) Authorization of an activity by an NWP does not authorize the “take” of a threatened
or endangered species as defined under the ESA. In the absence of separate
authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with “incidental take”
provisions, etc.) from the FWS or the NMFS, the Endangered Species Act prohibits any
person subject to the jurisdiction of the United States to take a listed species, where
"take" means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect,
or to attempt to engage in any such conduct. The word “harm” in the definition of “take''
means an act which actually kills or injures wildlife. Such an act may include significant
habitat modification or degradation where it actually kills or injures wildlife by
significantly impairing essential behavioral patterns, including breeding, feeding or
sheltering.
(f) If the non-federal permittee has a valid ESA section 10(a)(1)(B) incidental take permit
with an approved Habitat Conservation Plan for a project or a group of projects that
includes the proposed NWP activity, the non-federal applicant should provide a copy of
that ESA section 10(a)(1)(B) permit with the PCN required by paragraph (c) of this
general condition. The district engineer will coordinate with the agency that issued the
ESA section 10(a)(1)(B) permit to determine whether the proposed NWP activity and
the associated incidental take were considered in the internal ESA section 7
consultation conducted for the ESA section 10(a)(1)(B) permit. If that coordination
results in concurrence from the agency that the proposed NWP activity and the
associated incidental take were considered in the internal ESA section 7 consultation for
the ESA section 10(a)(1)(B) permit, the district engineer does not need to conduct a
separate ESA section 7 consultation for the proposed NWP activity. The district
engineer will notify the non-federal applicant within 45 days of receipt of a complete pre-
construction notification whether the ESA section 10(a)(1)(B) permit covers the
proposed NWP activity or whether additional ESA section 7 consultation is required.
(g) Information on the location of threatened and endangered species and their critical
habitat can be obtained directly from the offices of the FWS and NMFS or their world
wide web pages at http://www.fws.gov/ or http://www.fws.gov/ipac and
http://www.nmfs.noaa.gov/pr/species/esa/ respectively.
19. Migratory Birds and Bald and Golden Eagles. The permittee is responsible for
ensuring that an action authorized by an NWP complies with the Migratory Bird Treaty
Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for
contacting the appropriate local office of the U.S. Fish and Wildlife Service to determine
what measures, if any, are necessary or appropriate to reduce adverse effects to
migratory birds or eagles, including whether "incidental take" permits are necessary and
available under the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act
for a particular activity.
20. Historic Properties. (a) No activity is authorized under any NWP which may have the
potential to cause effects to properties listed, or eligible for listing, in the National
Register of Historic Places until the requirements of Section 106 of the National Historic
Preservation Act (NHPA) have been satisfied.
(b) Federal permittees should follow their own procedures for complying with the
requirements of section 106 of the National Historic Preservation Act (see 33 CFR
330.4(g)(1)). If pre-construction notification is required for the proposed NWP activity,
the Federal permittee must provide the district engineer with the appropriate
documentation to demonstrate compliance with those requirements. The district
engineer will verify that the appropriate documentation has been submitted. If the
appropriate documentation is not submitted, then additional consultation under section
106 may be necessary. The respective federal agency is responsible for fulfilling its
obligation to comply with section 106.
(c) Non-federal permittees must submit a pre-construction notification to the district
engineer if the NWP activity might have the potential to cause effects to any historic
properties listed on, determined to be eligible for listing on, or potentially eligible for
listing on the National Register of Historic Places, including previously unidentified
properties. For such activities, the pre-construction notification must state which historic
properties might have the potential to be affected by the proposed NWP activity or
include a vicinity map indicating the location of the historic properties or the potential for
the presence of historic properties. Assistance regarding information on the location of,
or potential for, the presence of historic properties can be sought from the State Historic
Preservation Officer, Tribal Historic Preservation Officer, or designated tribal
representative, as appropriate, and the National Register of Historic Places (see 33
CFR 330.4(g)). When reviewing pre-construction notifications, district engineers will
comply with the current procedures for addressing the requirements of section 106 of
the National Historic Preservation Act. The district engineer shall make a reasonable
and good faith effort to carry out appropriate identification efforts commensurate with
potential impacts, which may include background research, consultation, oral history
interviews, sample field investigation, and/or field survey. Based on the information
submitted in the PCN and these identification efforts, the district engineer shall
determine whether the proposed NWP activity has the potential to cause effects on the
historic properties. Section 106 consultation is not required when the district engineer
determines that the activity does not have the potential to cause effects on historic
properties (see 36 CFR 800.3(a)). Section 106 consultation is required when the district
engineer determines that the activity has the potential to cause effects on historic
properties. The district engineer will conduct consultation with consulting parties
identified under 36 CFR 800.2(c) when he or she makes any of the following effect
determinations for the purposes of section 106 of the NHPA: no historic properties
affected, no adverse effect, or adverse effect.
(d) Where the non-Federal applicant has identified historic properties on which the
proposed NWP activity might have the potential to cause effects and has so notified the
Corps, the non-Federal applicant shall not begin the activity until notified by the district
engineer either that the activity has no potential to cause effects to historic properties or
that NHPA section 106 consultation has been completed. For non-federal permittees,
the district engineer will notify the prospective permittee within 45 days of receipt of a
complete pre-construction notification whether NHPA section 106 consultation is
required. If NHPA section 106 consultation is required, the district engineer will notify
the non-Federal applicant that he or she cannot begin the activity until section 106
consultation is completed. If the non-Federal applicant has not heard back from the
Corps within 45 days, the applicant must still wait for notification from the Corps.
(e) Prospective permittees should be aware that section 110k of the NHPA (54 U.S.C.
306113) prevents the Corps from granting a permit or other assistance to an applicant
who, with intent to avoid the requirements of section 106 of the NHPA, has intentionally
significantly adversely affected a historic property to which the permit would relate, or
having legal power to prevent it, allowed such significant adverse effect to occur, unless
the Corps, after consultation with the Advisory Council on Historic Preservation (ACHP),
determines that circumstances justify granting such assistance despite the adverse
effect created or permitted by the applicant. If circumstances justify granting the
assistance, the Corps is required to notify the ACHP and provide documentation
specifying the circumstances, the degree of damage to the integrity of any historic
properties affected, and proposed mitigation. This documentation must include any
views obtained from the applicant, SHPO/THPO, appropriate Indian tribes if the
undertaking occurs on or affects historic properties on tribal lands or affects properties
of interest to those tribes, and other parties known to have a legitimate interest in the
impacts to the permitted activity on historic properties.
21. Discovery of Previously Unknown Remains and Artifacts. Permittees that discover
any previously unknown historic, cultural or archeological remains and artifacts while
accomplishing the activity authorized by an NWP, they must immediately notify the
district engineer of what they have found, and to the maximum extent practicable, avoid
construction activities that may affect the remains and artifacts until the required
coordination has been completed. The district engineer will initiate the Federal, Tribal,
and state coordination required to determine if the items or remains warrant a recovery
effort or if the site is eligible for listing in the National Register of Historic Places.
22. Designated Critical Resource Waters. Critical resource waters include, NOAA-
managed marine sanctuaries and marine monuments, and National Estuarine Research
Reserves. The district engineer may designate, after notice and opportunity for public
comment, additional waters officially designated by a state as having particular
environmental or ecological significance, such as outstanding national resource waters
or state natural heritage sites. The district engineer may also designate additional
critical resource waters after notice and opportunity for public comment.
(a) Discharges of dredged or fill material into waters of the United States are not
authorized by NWPs 7, 12, 14, 16, 17, 21, 29, 31, 35, 39, 40, 42, 43, 44, 49, 50, 51, 52,
57 and 58 for any activity within, or directly affecting, critical resource waters, including
wetlands adjacent to such waters.
(b) For NWPs 3, 8, 10, 13, 15, 18, 19, 22, 23, 25, 27, 28, 30, 33, 34, 36, 37, 38, and 54,
notification is required in accordance with general condition 32, for any activity proposed
by permittees in the designated critical resource waters including wetlands adjacent to
those waters. The district engineer may authorize activities under these NWPs only
after she or he determines that the impacts to the critical resource waters will be no
more than minimal.
23. Mitigation. The district engineer will consider the following factors when determining
appropriate and practicable mitigation necessary to ensure that the individual and
cumulative adverse environmental effects are no more than minimal:
(a) The activity must be designed and constructed to avoid and minimize adverse
effects, both temporary and permanent, to waters of the United States to the maximum
extent practicable at the project site (i.e., on site).
(b) Mitigation in all its forms (avoiding, minimizing, rectifying, reducing, or compensating
for resource losses) will be required to the extent necessary to ensure that the individual
and cumulative adverse environmental effects are no more than minimal.
(c) Compensatory mitigation at a minimum one-for-one ratio will be required for all
wetland losses that exceed 1/10-acre and require pre-construction notification, unless
the district engineer determines in writing that either some other form of mitigation
would be more environmentally appropriate or the adverse environmental effects of the
proposed activity are no more than minimal, and provides an activity-specific waiver of
this requirement. For wetland losses of 1/10-acre or less that require pre-construction
notification, the district engineer may determine on a case-by-case basis that
compensatory mitigation is required to ensure that the activity results in only minimal
adverse environmental effects.
(d) Compensatory mitigation at a minimum one-for-one ratio will be required for all
losses of stream bed that exceed 3/100-acre and require pre-construction notification,
unless the district engineer determines in writing that either some other form of
mitigation would be more environmentally appropriate or the adverse environmental
effects of the proposed activity are no more than minimal, and provides an activity-
specific waiver of this requirement. This compensatory mitigation requirement may be
satisfied through the restoration or enhancement of riparian areas next to streams in
accordance with paragraph (e) of this general condition. For losses of stream bed of
3/100-acre or less that require pre-construction notification, the district engineer may
determine on a case-by-case basis that compensatory mitigation is required to ensure
that the activity results in only minimal adverse environmental effects. Compensatory
mitigation for losses of streams should be provided, if practicable, through stream
rehabilitation, enhancement, or preservation, since streams are difficult-to-replace
resources (see 33 CFR 332.3(e)(3)).
(e) Compensatory mitigation plans for NWP activities in or near streams or other open
waters will normally include a requirement for the restoration or enhancement,
maintenance, and legal protection (e.g., conservation easements) of riparian areas next
to open waters. In some cases, the restoration or maintenance/protection of riparian
areas may be the only compensatory mitigation required. If restoring riparian areas
involves planting vegetation, only native species should be planted. The width of the
required riparian area will address documented water quality or aquatic habitat loss
concerns. Normally, the riparian area will be 25 to 50 feet wide on each side of the
stream, but the district engineer may require slightly wider riparian areas to address
documented water quality or habitat loss concerns. If it is not possible to restore or
maintain/protect a riparian area on both sides of a stream, or if the waterbody is a lake
or coastal waters, then restoring or maintaining/protecting a riparian area along a single
bank or shoreline may be sufficient. Where both wetlands and open waters exist on the
project site, the district engineer will determine the appropriate compensatory mitigation
(e.g., riparian areas and/or wetlands compensation) based on what is best for the
aquatic environment on a watershed basis. In cases where riparian areas are
determined to be the most appropriate form of minimization or compensatory mitigation,
the district engineer may waive or reduce the requirement to provide wetland
compensatory mitigation for wetland losses.
(f) Compensatory mitigation projects provided to offset losses of aquatic resources must
comply with the applicable provisions of 33 CFR part 332.
(1) The prospective permittee is responsible for proposing an appropriate compensatory
mitigation option if compensatory mitigation is necessary to ensure that the activity
results in no more than minimal adverse environmental effects. For the NWPs, the
preferred mechanism for providing compensatory mitigation is mitigation bank credits or
in-lieu fee program credits (see 33 CFR 332.3(b)(2) and (3)). However, if an appropriate
number and type of mitigation bank or in-lieu credits are not available at the time the
PCN is submitted to the district engineer, the district engineer may approve the use of
permittee-responsible mitigation.
(2) The amount of compensatory mitigation required by the district engineer must be
sufficient to ensure that the authorized activity results in no more than minimal individual
and cumulative adverse environmental effects (see 33 CFR 330.1(e)(3)). (See also 33
CFR 332.3(f).)
(3) Since the likelihood of success is greater and the impacts to potentially valuable
uplands are reduced, aquatic resource restoration should be the first compensatory
mitigation option considered for permittee-responsible mitigation.
(4) If permittee-responsible mitigation is the proposed option, the prospective permittee
is responsible for submitting a mitigation plan. A conceptual or detailed mitigation plan
may be used by the district engineer to make the decision on the NWP verification
request, but a final mitigation plan that addresses the applicable requirements of 33
CFR 332.4(c)(2) through (14) must be approved by the district engineer before the
permittee begins work in waters of the United States, unless the district engineer
determines that prior approval of the final mitigation plan is not practicable or not
necessary to ensure timely completion of the required compensatory mitigation (see 33
CFR 332.3(k)(3)). If permittee-responsible mitigation is the proposed option, and the
proposed compensatory mitigation site is located on land in which another federal
agency holds an easement, the district engineer will coordinate with that federal agency
to determine if proposed compensatory mitigation project is compatible with the terms of
the easement.
(5) If mitigation bank or in-lieu fee program credits are the proposed option, the
mitigation plan needs to address only the baseline conditions at the impact site and the
number of credits to be provided (see 33 CFR 332.4(c)(1)(ii)).
(6) Compensatory mitigation requirements (e.g., resource type and amount to be
provided as compensatory mitigation, site protection, ecological performance standards,
monitoring requirements) may be addressed through conditions added to the NWP
authorization, instead of components of a compensatory mitigation plan (see 33 CFR
332.4(c)(1)(ii)).
(g) Compensatory mitigation will not be used to increase the acreage losses allowed by
the acreage limits of the NWPs. For example, if an NWP has an acreage limit of 1/2-
acre, it cannot be used to authorize any NWP activity resulting in the loss of greater
than 1/2-acre of waters of the United States, even if compensatory mitigation is
provided that replaces or restores some of the lost waters. However, compensatory
mitigation can and should be used, as necessary, to ensure that an NWP activity
already meeting the established acreage limits also satisfies the no more than minimal
impact requirement for the NWPs.
(h) Permittees may propose the use of mitigation banks, in-lieu fee programs, or
permittee-responsible mitigation. When developing a compensatory mitigation proposal,
the permittee must consider appropriate and practicable options consistent with the
framework at 33 CFR 332.3(b). For activities resulting in the loss of marine or estuarine
resources, permittee-responsible mitigation may be environmentally preferable if there
are no mitigation banks or in-lieu fee programs in the area that have marine or estuarine
credits available for sale or transfer to the permittee. For permittee-responsible
mitigation, the special conditions of the NWP verification must clearly indicate the party
or parties responsible for the implementation and performance of the compensatory
mitigation project, and, if required, its long-term management.
(i) Where certain functions and services of waters of the United States are permanently
adversely affected by a regulated activity, such as discharges of dredged or fill material
into waters of the United States that will convert a forested or scrub-shrub wetland to a
herbaceous wetland in a permanently maintained utility line right-of-way, mitigation may
be required to reduce the adverse environmental effects of the activity to the no more
than minimal level.
24. Safety of Impoundment Structures. To ensure that all impoundment structures are
safely designed, the district engineer may require non-Federal applicants to
demonstrate that the structures comply with established state or federal, dam safety
criteria or have been designed by qualified persons. The district engineer may also
require documentation that the design has been independently reviewed by similarly
qualified persons, and appropriate modifications made to ensure safety.
25. Water Quality. (a) Where the certifying authority (state, authorized tribe, or EPA, as
appropriate) has not previously certified compliance of an NWP with CWA section 401,
a CWA section 401 water quality certification for the proposed discharge must be
obtained or waived (see 33 CFR 330.4(c)). If the permittee cannot comply with all of the
conditions of a water quality certification previously issued by certifying authority for the
issuance of the NWP, then the permittee must obtain a water quality certification or
waiver for the proposed discharge in order for the activity to be authorized by an NWP.
(b) If the NWP activity requires pre-construction notification and the certifying authority
has not previously certified compliance of an NWP with CWA section 401, the proposed
discharge is not authorized by an NWP until water quality certification is obtained or
waived. If the certifying authority issues a water quality certification for the proposed
discharge, the permittee must submit a copy of the certification to the district engineer.
The discharge is not authorized by an NWP until the district engineer has notified the
permittee that the water quality certification requirement has been satisfied by the
issuance of a water quality certification or a waiver.
(c) The district engineer or certifying authority may require additional water quality
management measures to ensure that the authorized activity does not result in more
than minimal degradation of water quality.
26. Coastal Zone Management. In coastal states where an NWP has not previously
received a state coastal zone management consistency concurrence, an individual state
coastal zone management consistency concurrence must be obtained, or a
presumption of concurrence must occur (see 33 CFR 330.4(d)). If the permittee cannot
comply with all of the conditions of a coastal zone management consistency
concurrence previously issued by the state, then the permittee must obtain an individual
coastal zone management consistency concurrence or presumption of concurrence in
order for the activity to be authorized by an NWP. The district engineer or a state may
require additional measures to ensure that the authorized activity is consistent with state
coastal zone management requirements.
27. Regional and Case-By-Case Conditions. The activity must comply with any regional
conditions that may have been added by the Division Engineer (see 33 CFR 330.4(e))
and with any case specific conditions added by the Corps or by the state, Indian Tribe,
or U.S. EPA in its CWA section 401 Water Quality Certification, or by the state in its
Coastal Zone Management Act consistency determination.
28. Use of Multiple Nationwide Permits. The use of more than one NWP for a single and
complete project is authorized, subject to the following restrictions:
(a) If only one of the NWPs used to authorize the single and complete project has a
specified acreage limit, the acreage loss of waters of the United States cannot exceed
the acreage limit of the NWP with the highest specified acreage limit. For example, if a
road crossing over tidal waters is constructed under NWP 14, with associated bank
stabilization authorized by NWP 13, the maximum acreage loss of waters of the United
States for the total project cannot exceed 1⁄3-acre.
(b) If one or more of the NWPs used to authorize the single and complete project has
specified acreage limits, the acreage loss of waters of the United States authorized by
those NWPs cannot exceed their respective specified acreage limits. For example, if a
commercial development is constructed under NWP 39, and the single and complete
project includes the filling of an upland ditch authorized by NWP 46, the maximum
acreage loss of waters of the United States for the commercial development under
NWP 39 cannot exceed 1/2-acre, and the total acreage loss of waters of United States
due to the NWP 39 and 46 activities cannot exceed 1 acre.
29. Transfer of Nationwide Permit Verifications. If the permittee sells the property
associated with a nationwide permit verification, the permittee may transfer the
nationwide permit verification to the new owner by submitting a letter to the appropriate
Corps district office to validate the transfer. A copy of the nationwide permit verification
must be attached to the letter, and the letter must contain the following statement and
signature:
“When the structures or work authorized by this nationwide permit are still in existence
at the time the property is transferred, the terms and conditions of this nationwide
permit, including any special conditions, will continue to be binding on the new owner(s)
of the property. To validate the transfer of this nationwide permit and the associated
liabilities associated with compliance with its terms and conditions, have the transferee
sign and date below.”
_____________________________________________
(Transferee)
_____________________________________________
(Date)
30. Compliance Certification. Each permittee who receives an NWP verification letter
from the Corps must provide a signed certification documenting completion of the
authorized activity and implementation of any required compensatory mitigation. The
success of any required permittee-responsible mitigation, including the achievement of
ecological performance standards, will be addressed separately by the district engineer.
The Corps will provide the permittee the certification document with the NWP
verification letter. The certification document will include:
(a) A statement that the authorized activity was done in accordance with the NWP
authorization, including any general, regional, or activity-specific conditions;
(b) A statement that the implementation of any required compensatory mitigation was
completed in accordance with the permit conditions. If credits from a mitigation bank or
in-lieu fee program are used to satisfy the compensatory mitigation requirements, the
certification must include the documentation required by 33 CFR 332.3(l)(3) to confirm
that the permittee secured the appropriate number and resource type of credits; and
(c) The signature of the permittee certifying the completion of the activity and mitigation.
The completed certification document must be submitted to the district engineer within
30 days of completion of the authorized activity or the implementation of any required
compensatory mitigation, whichever occurs later.
31. Activities Affecting Structures or Works Built by the United States. If an NWP
activity also requires review by, or permission from, the Corps pursuant to 33 U.S.C.
408 because it will alter or temporarily or permanently occupy or use a U.S. Army Corps
of Engineers (USACE) federally authorized Civil Works project (a “USACE project”), the
prospective permittee must submit a pre-construction notification. See paragraph
(b)(10) of general condition 32. An activity that requires section 408 permission and/or
review is not authorized by an NWP until the appropriate Corps office issues the section
408 permission or completes its review to alter, occupy, or use the USACE project, and
the district engineer issues a written NWP verification.
32. Pre-Construction Notification. (a) Timing. Where required by the terms of the NWP,
the prospective permittee must notify the district engineer by submitting a pre-
construction notification (PCN) as early as possible. The district engineer must
determine if the PCN is complete within 30 calendar days of the date of receipt and, if
the PCN is determined to be incomplete, notify the prospective permittee within that 30
day period to request the additional information necessary to make the PCN complete.
The request must specify the information needed to make the PCN complete. As a
general rule, district engineers will request additional information necessary to make the
PCN complete only once. However, if the prospective permittee does not provide all of
the requested information, then the district engineer will notify the prospective permittee
that the PCN is still incomplete and the PCN review process will not commence until all
of the requested information has been received by the district engineer. The prospective
permittee shall not begin the activity until either:
(1) He or she is notified in writing by the district engineer that the activity may proceed
under the NWP with any special conditions imposed by the district or division engineer;
or
(2) 45 calendar days have passed from the district engineer’s receipt of the complete
PCN and the prospective permittee has not received written notice from the district or
division engineer. However, if the permittee was required to notify the Corps pursuant to
general condition 18 that listed species or critical habitat might be affected or are in the
vicinity of the activity, or to notify the Corps pursuant to general condition 20 that the
activity might have the potential to cause effects to historic properties, the permittee
cannot begin the activity until receiving written notification from the Corps that there is
“no effect” on listed species or “no potential to cause effects” on historic properties, or
that any consultation required under Section 7 of the Endangered Species Act (see 33
CFR 330.4(f)) and/or section 106 of the National Historic Preservation Act (see 33 CFR
330.4(g)) has been completed. If the proposed activity requires a written waiver to
exceed specified limits of an NWP, the permittee may not begin the activity until the
district engineer issues the waiver. If the district or division engineer notifies the
permittee in writing that an individual permit is required within 45 calendar days of
receipt of a complete PCN, the permittee cannot begin the activity until an individual
permit has been obtained. Subsequently, the permittee’s right to proceed under the
NWP may be modified, suspended, or revoked only in accordance with the procedure
set forth in 33 CFR 330.5(d)(2).
(b) Contents of Pre-Construction Notification: The PCN must be in writing and include
the following information:
(1) Name, address and telephone numbers of the prospective permittee;
(2) Location of the proposed activity;
(3) Identify the specific NWP or NWP(s) the prospective permittee wants to use to
authorize the proposed activity;
(4) (i) A description of the proposed activity; the activity’s purpose; direct and indirect
adverse environmental effects the activity would cause, including the anticipated
amount of loss of wetlands, other special aquatic sites, and other waters expected to
result from the NWP activity, in acres, linear feet, or other appropriate unit of measure; a
description of any proposed mitigation measures intended to reduce the adverse
environmental effects caused by the proposed activity; and any other NWP(s), regional
general permit(s), or individual permit(s) used or intended to be used to authorize any
part of the proposed project or any related activity, including other separate and distant
crossings for linear projects that require Department of the Army authorization but do
not require pre-construction notification. The description of the proposed activity and
any proposed mitigation measures should be sufficiently detailed to allow the district
engineer to determine that the adverse environmental effects of the activity will be no
more than minimal and to determine the need for compensatory mitigation or other
mitigation measures.
(ii) For linear projects where one or more single and complete crossings require pre-
construction notification, the PCN must include the quantity of anticipated losses of
wetlands, other special aquatic sites, and other waters for each single and complete
crossing of those wetlands, other special aquatic sites, and other waters (including
those single and complete crossings authorized by an NWP but do not require PCNs).
This information will be used by the district engineer to evaluate the cumulative adverse
environmental effects of the proposed linear project, and does not change those non-
PCN NWP activities into NWP PCNs.
(iii) Sketches should be provided when necessary to show that the activity complies
with the terms of the NWP. (Sketches usually clarify the activity and when provided
results in a quicker decision. Sketches should contain sufficient detail to provide an
illustrative description of the proposed activity (e.g., a conceptual plan), but do not need
to be detailed engineering plans);
(5) The PCN must include a delineation of wetlands, other special aquatic sites, and
other waters, such as lakes and ponds, and perennial and intermittent streams, on the
project site. Wetland delineations must be prepared in accordance with the current
method required by the Corps. The permittee may ask the Corps to delineate the
special aquatic sites and other waters on the project site, but there may be a delay if the
Corps does the delineation, especially if the project site is large or contains many
wetlands, other special aquatic sites, and other waters. Furthermore, the 45-day period
will not start until the delineation has been submitted to or completed by the Corps, as
appropriate;
(6) If the proposed activity will result in the loss of greater than 1/10-acre of wetlands or
3/100-acre of stream bed and a PCN is required, the prospective permittee must submit
a statement describing how the mitigation requirement will be satisfied, or explaining
why the adverse environmental effects are no more than minimal and why
compensatory mitigation should not be required. As an alternative, the prospective
permittee may submit a conceptual or detailed mitigation plan.
(7) For non-federal permittees, if any listed species (or species proposed for listing) or
designated critical habitat (or critical habitat proposed for such designation) might be
affected or is in the vicinity of the activity, or if the activity is located in designated critical
habitat (or critical habitat proposed for such designation), the PCN must include the
name(s) of those endangered or threatened species (or species proposed for listing)
that might be affected by the proposed activity or utilize the designated critical habitat
(or critical habitat proposed for such designation) that might be affected by the proposed
activity. For NWP activities that require pre-construction notification, Federal permittees
must provide documentation demonstrating compliance with the Endangered Species
Act;
(8) For non-federal permittees, if the NWP activity might have the potential to cause
effects to a historic property listed on, determined to be eligible for listing on, or
potentially eligible for listing on, the National Register of Historic Places, the PCN must
state which historic property might have the potential to be affected by the proposed
activity or include a vicinity map indicating the location of the historic property.
For NWP
activities that require pre-construction notification, Federal permittees must provide
documentation demonstrating compliance with section 106 of the National Historic
Preservation Act;
(9) For an activity that will occur in a component of the National Wild and Scenic River
System, or in a river officially designated by Congress as a “study river” for possible
inclusion in the system while the river is in an official study status, the PCN must identify
the Wild and Scenic River or the “study river” (see general condition 16); and
(10) For an NWP activity that requires permission from, or review by, the Corps
pursuant to 33 U.S.C. 408 because it will alter or temporarily or permanently occupy or
use a U.S. Army Corps of Engineers federally authorized civil works project, the pre-
construction notification must include a statement confirming that the project proponent
has submitted a written request for section 408 permission from, or review by, the Corps
office having jurisdiction over that USACE project.
(c) Form of Pre-Construction Notification: The nationwide permit pre-construction
notification form (Form ENG 6082) should be used for NWP PCNs. A letter containing
the required information may also be used. Applicants may provide electronic files of
PCNs and supporting materials if the district engineer has established tools and
procedures for electronic submittals.
(d) Agency Coordination: (1) The district engineer will consider any comments from
Federal and state agencies concerning the proposed activity’s compliance with the
terms and conditions of the NWPs and the need for mitigation to reduce the activity’s
adverse environmental effects so that they are no more than minimal.
(2) Agency coordination is required for: (i) all NWP activities that require pre-
construction notification and result in the loss of greater than 1/2-acre of waters of the
United States; (ii) NWP 13 activities in excess of 500 linear feet, fills greater than one
cubic yard per running foot, or involve discharges of dredged or fill material into special
aquatic sites; and (iii) NWP 54 activities in excess of 500 linear feet, or that extend into
the waterbody more than 30 feet from the mean low water line in tidal waters or the
ordinary high water mark in the Great Lakes.
(3) When agency coordination is required, the district engineer will immediately provide
(e.g., via e-mail, facsimile transmission, overnight mail, or other expeditious manner) a
copy of the complete PCN to the appropriate Federal or state offices (FWS, state
natural resource or water quality agency, EPA, and, if appropriate, the NMFS). With the
exception of NWP 37, these agencies will have 10 calendar days from the date the
material is transmitted to notify the district engineer via telephone, facsimile
transmission, or e-mail that they intend to provide substantive, site-specific comments.
The comments must explain why the agency believes the adverse environmental effects
will be more than minimal. If so contacted by an agency, the district engineer will wait an
additional 15 calendar days before making a decision on the pre-construction
notification. The district engineer will fully consider agency comments received within
the specified time frame concerning the proposed activity’s compliance with the terms
and conditions of the NWPs, including the need for mitigation to ensure that the net
adverse environmental effects of the proposed activity are no more than minimal. The
district engineer will provide no response to the resource agency, except as provided
below. The district engineer will indicate in the administrative record associated with
each pre-construction notification that the resource agencies’ concerns were
considered. For NWP 37, the emergency watershed protection and rehabilitation activity
may proceed immediately in cases where there is an unacceptable hazard to life or a
significant loss of property or economic hardship will occur. The district engineer will
consider any comments received to decide whether the NWP 37 authorization should
be modified, suspended, or revoked in accordance with the procedures at 33 CFR
330.5.
(4) In cases of where the prospective permittee is not a Federal agency, the district
engineer will provide a response to NMFS within 30 calendar days of receipt of any
Essential Fish Habitat conservation recommendations, as required by section
305(b)(4)(B) of the Magnuson-Stevens Fishery Conservation and Management Act.
(5) Applicants are encouraged to provide the Corps with either electronic files or
multiple copies of pre-construction notifications to expedite agency coordination.
District Engineer’s Decision
1. In reviewing the PCN for the proposed activity, the district engineer will determine
whether the activity authorized by the NWP will result in more than minimal individual or
cumulative adverse environmental effects or may be contrary to the public interest. If a
project proponent requests authorization by a specific NWP, the district engineer should
issue the NWP verification for that activity if it meets the terms and conditions of that
NWP, unless he or she determines, after considering mitigation, that the proposed
activity will result in more than minimal individual and cumulative adverse effects on the
aquatic environment and other aspects of the public interest and exercises discretionary
authority to require an individual permit for the proposed activity. For a linear project,
this determination will include an evaluation of the single and complete crossings of
waters of the United States that require PCNs to determine whether they individually
satisfy the terms and conditions of the NWP(s), as well as the cumulative effects caused
by all of the crossings of waters of the United States authorized by an NWP. If an
applicant requests a waiver of an applicable limit, as provided for in NWPs 13, 36, or 54,
the district engineer will only grant the waiver upon a written determination that the
NWP activity will result in only minimal individual and cumulative adverse environmental
effects.
2. When making minimal adverse environmental effects determinations the district
engineer will consider the direct and indirect effects caused by the NWP activity. He or
she will also consider the cumulative adverse environmental effects caused by activities
authorized by an NWP and whether those cumulative adverse environmental effects are
no more than minimal. The district engineer will also consider site specific factors, such
as the environmental setting in the vicinity of the NWP activity, the type of resource that
will be affected by the NWP activity, the functions provided by the aquatic resources
that will be affected by the NWP activity, the degree or magnitude to which the aquatic
resources perform those functions, the extent that aquatic resource functions will be lost
as a result of the NWP activity (e.g., partial or complete loss), the duration of the
adverse effects (temporary or permanent), the importance of the aquatic resource
functions to the region (e.g., watershed or ecoregion), and mitigation required by the
district engineer. If an appropriate functional or condition assessment method is
available and practicable to use, that assessment method may be used by the district
engineer to assist in the minimal adverse environmental effects determination. The
district engineer may add case-specific special conditions to the NWP authorization to
address site-specific environmental concerns.
3. If the proposed activity requires a PCN and will result in a loss of greater than 1/10-
acre of wetlands or 3/100-acre of stream bed, the prospective permittee should submit a
mitigation proposal with the PCN. Applicants may also propose compensatory mitigation
for NWP activities with smaller impacts, or for impacts to other types of waters. The
district engineer will consider any proposed compensatory mitigation or other mitigation
measures the applicant has included in the proposal in determining whether the net
adverse environmental effects of the proposed activity are no more than minimal. The
compensatory mitigation proposal may be either conceptual or detailed. If the district
engineer determines that the activity complies with the terms and conditions of the NWP
and that the adverse environmental effects are no more than minimal, after considering
mitigation, the district engineer will notify the permittee and include any activity-specific
conditions in the NWP verification the district engineer deems necessary. Conditions for
compensatory mitigation requirements must comply with the appropriate provisions at
33 CFR 332.3(k). The district engineer must approve the final mitigation plan before the
permittee commences work in waters of the United States, unless the district engineer
determines that prior approval of the final mitigation plan is not practicable or not
necessary to ensure timely completion of the required compensatory mitigation. If the
prospective permittee elects to submit a compensatory mitigation plan with the PCN, the
district engineer will expeditiously review the proposed compensatory mitigation plan.
The district engineer must review the proposed compensatory mitigation plan within 45
calendar days of receiving a complete PCN and determine whether the proposed
mitigation would ensure that the NWP activity results in no more than minimal adverse
environmental effects. If the net adverse environmental effects of the NWP activity (after
consideration of the mitigation proposal) are determined by the district engineer to be no
more than minimal, the district engineer will provide a timely written response to the
applicant. The response will state that the NWP activity can proceed under the terms
and conditions of the NWP, including any activity-specific conditions added to the NWP
authorization by the district engineer.
4. If the district engineer determines that the adverse environmental effects of the
proposed activity are more than minimal, then the district engineer will notify the
applicant either: (a) that the activity does not qualify for authorization under the NWP
and instruct the applicant on the procedures to seek authorization under an individual
permit; (b) that the activity is authorized under the NWP subject to the applicant’s
submission of a mitigation plan that would reduce the adverse environmental effects so
that they are no more than minimal; or (c) that the activity is authorized under the NWP
with specific modifications or conditions. Where the district engineer determines that
mitigation is required to ensure no more than minimal adverse environmental effects,
the activity will be authorized within the 45-day PCN period (unless additional time is
required to comply with general conditions 18, 20, and/or 31), with activity-specific
conditions that state the mitigation requirements. The authorization will include the
necessary conceptual or detailed mitigation plan or a requirement that the applicant
submit a mitigation plan that would reduce the adverse environmental effects so that
they are no more than minimal. When compensatory mitigation is required, no work in
waters of the United States may occur until the district engineer has approved a specific
mitigation plan or has determined that prior approval of a final mitigation plan is not
practicable or not necessary to ensure timely completion of the required compensatory
mitigation.
Further Information
1. District engineers have authority to determine if an activity complies with the terms
and conditions of an NWP.
2. NWPs do not obviate the need to obtain other federal, state, or local permits,
approvals, or authorizations required by law.
3. NWPs do not grant any property rights or exclusive privileges.
4. NWPs do not authorize any injury to the property or rights of others.
5. NWPs do not authorize interference with any existing or proposed Federal project
(see general condition 31).
Nationwide Permit Definitions
Best management practices (BMPs): Policies, practices, procedures, or structures
implemented to mitigate the adverse environmental effects on surface water quality
resulting from development. BMPs are categorized as structural or non-structural.
Compensatory mitigation: The restoration (re-establishment or rehabilitation),
establishment (creation), enhancement, and/or in certain circumstances preservation of
aquatic resources for the purposes of offsetting unavoidable adverse impacts which
remain after all appropriate and practicable avoidance and minimization has been
achieved.
Currently serviceable: Useable as is or with some maintenance, but not so degraded as
to essentially require reconstruction.
Direct effects: Effects that are caused by the activity and occur at the same time and
place.
Discharge: The term “discharge” means any discharge of dredged or fill material into
waters of the United States.
Ecological reference: A model used to plan and design an aquatic habitat and riparian
area restoration, enhancement, or establishment activity under NWP 27. An ecological
reference may be based on the structure, functions, and dynamics of an aquatic habitat
type or a riparian area type that currently exists in the region where the proposed NWP
27 activity is located. Alternatively, an ecological reference may be based on a
conceptual model for the aquatic habitat type or riparian area type to be restored,
enhanced, or established as a result of the proposed NWP 27 activity. An ecological
reference takes into account the range of variation of the aquatic habitat type or riparian
area type in the region.
Enhancement: The manipulation of the physical, chemical, or biological characteristics
of an aquatic resource to heighten, intensify, or improve a specific aquatic resource
function(s). Enhancement results in the gain of selected aquatic resource function(s),
but may also lead to a decline in other aquatic resource function(s). Enhancement does
not result in a gain in aquatic resource area.
Establishment (creation): The manipulation of the physical, chemical, or biological
characteristics present to develop an aquatic resource that did not previously exist at an
upland site. Establishment results in a gain in aquatic resource area.
High Tide Line: The line of intersection of the land with the water’s surface at the
maximum height reached by a rising tide. The high tide line may be determined, in the
absence of actual data, by a line of oil or scum along shore objects, a more or less
continuous deposit of fine shell or debris on the foreshore or berm, other physical
markings or characteristics, vegetation lines, tidal gages, or other suitable means that
delineate the general height reached by a rising tide. The line encompasses spring high
tides and other high tides that occur with periodic frequency but does not include storm
surges in which there is a departure from the normal or predicted reach of the tide due
to the piling up of water against a coast by strong winds such as those accompanying a
hurricane or other intense storm.
Historic Property: Any prehistoric or historic district, site (including archaeological site),
building, structure, or other object included in, or eligible for inclusion in, the National
Register of Historic Places maintained by the Secretary of the Interior. This term
includes artifacts, records, and remains that are related to and located within such
properties. The term includes properties of traditional religious and cultural importance
to an Indian tribe or Native Hawaiian organization and that meet the National Register
criteria (36 CFR part 60).
Independent utility: A test to determine what constitutes a single and complete non-
linear project in the Corps Regulatory Program. A project is considered to have
independent utility if it would be constructed absent the construction of other projects in
the project area. Portions of a multi-phase project that depend upon other phases of the
project do not have independent utility. Phases of a project that would be constructed
even if the other phases were not built can be considered as separate single and
complete projects with independent utility.
Indirect effects: Effects that are caused by the activity and are later in time or farther
removed in distance, but are still reasonably foreseeable.
Loss of waters of the United States: Waters of the United States that are permanently
adversely affected by filling, flooding, excavation, or drainage because of the regulated
activity. The loss of stream bed includes the acres of stream bed that are permanently
adversely affected by filling or excavation because of the regulated activity. Permanent
adverse effects include permanent discharges of dredged or fill material that change an
aquatic area to dry land, increase the bottom elevation of a waterbody, or change the
use of a waterbody. The acreage of loss of waters of the United States is a threshold
measurement of the impact to jurisdictional waters or wetlands for determining whether
a project may qualify for an NWP; it is not a net threshold that is calculated after
considering compensatory mitigation that may be used to offset losses of aquatic
functions and services. Waters of the United States temporarily filled, flooded,
excavated, or drained, but restored to pre-construction contours and elevations after
construction, are not included in the measurement of loss of waters of the United
States. Impacts resulting from activities that do not require Department of the Army
authorization, such as activities eligible for exemptions under section 404(f) of the Clean
Water Act, are not considered when calculating the loss of waters of the United States.
Navigable waters: Waters subject to section 10 of the Rivers and Harbors Act of 1899.
These waters are defined at 33 CFR part 329.
Non-tidal wetland: A non-tidal wetland is a wetland that is not subject to the ebb and
flow of tidal waters. Non-tidal wetlands contiguous to tidal waters are located landward
of the high tide line (i.e., spring high tide line).
Open water: For purposes of the NWPs, an open water is any area that in a year with
normal patterns of precipitation has water flowing or standing above ground to the
extent that an ordinary high water mark can be determined. Aquatic vegetation within
the area of flowing or standing water is either non-emergent, sparse, or absent.
Vegetated shallows are considered to be open waters. Examples of “open waters”
include rivers, streams, lakes, and ponds.
Ordinary High Water Mark: The term ordinary high water mark means that line on the
shore established by the fluctuations of water and indicated by physical characteristics
such as a clear, natural line impressed on the bank, shelving, changes in the character
of soil, destruction of terrestrial vegetation, the presence of litter and debris, or other
appropriate means that consider the characteristics of the surrounding areas.
Perennial stream: A perennial stream has surface water flowing continuously year-
round during a typical year.
Practicable: Available and capable of being done after taking into consideration cost,
existing technology, and logistics in light of overall project purposes.
Pre-construction notification: A request submitted by the project proponent to the Corps
for confirmation that a particular activity is authorized by nationwide permit. The request
may be a permit application, letter, or similar document that includes information about
the proposed work and its anticipated environmental effects. Pre-construction
notification may be required by the terms and conditions of a nationwide permit, or by
regional conditions. A pre-construction notification may be voluntarily submitted in cases
where pre-construction notification is not required and the project proponent wants
confirmation that the activity is authorized by nationwide permit.
Preservation: The removal of a threat to, or preventing the decline of, aquatic resources
by an action in or near those aquatic resources. This term includes activities commonly
associated with the protection and maintenance of aquatic resources through the
implementation of appropriate legal and physical mechanisms. Preservation does not
result in a gain of aquatic resource area or functions.
Re-establishment: The manipulation of the physical, chemical, or biological
characteristics of a site with the goal of returning natural/historic functions to a former
aquatic resource. Re-establishment results in rebuilding a former aquatic resource and
results in a gain in aquatic resource area and functions.
Rehabilitation: The manipulation of the physical, chemical, or biological characteristics
of a site with the goal of repairing natural/historic functions to a degraded aquatic
resource. Rehabilitation results in a gain in aquatic resource function, but does not
result in a gain in aquatic resource area.
Restoration: The manipulation of the physical, chemical, or biological characteristics of
a site with the goal of returning natural/historic functions to a former or degraded aquatic
resource. For the purpose of tracking net gains in aquatic resource area, restoration is
divided into two categories: re-establishment and rehabilitation.
Riffle and pool complex: Riffle and pool complexes are special aquatic sites under the
404(b)(1) Guidelines. Riffle and pool complexes sometimes characterize steep gradient
sections of streams. Such stream sections are recognizable by their hydraulic
characteristics. The rapid movement of water over a course substrate in riffles results in
a rough flow, a turbulent surface, and high dissolved oxygen levels in the water. Pools
are deeper areas associated with riffles. A slower stream velocity, a streaming flow, a
smooth surface, and a finer substrate characterize pools.
Riparian areas: Riparian areas are lands next to streams, lakes, and estuarine-marine
shorelines. Riparian areas are transitional between terrestrial and aquatic ecosystems,
through which surface and subsurface hydrology connects riverine, lacustrine,
estuarine, and marine waters with their adjacent wetlands, non-wetland waters, or
uplands. Riparian areas provide a variety of ecological functions and services and help
improve or maintain local water quality. (See general condition 23.)
Shellfish seeding: The placement of shellfish seed and/or suitable substrate to increase
shellfish production. Shellfish seed consists of immature individual shellfish or individual
shellfish attached to shells or shell fragments (i.e., spat on shell). Suitable substrate
may consist of shellfish shells, shell fragments, or other appropriate materials placed
into waters for shellfish habitat.
Single and complete linear project: A linear project is a project constructed for the
purpose of getting people, goods, or services from a point of origin to a terminal point,
which often involves multiple crossings of one or more waterbodies at separate and
distant locations. The term “single and complete project” is defined as that portion of the
total linear project proposed or accomplished by one owner/developer or partnership or
other association of owners/developers that includes all crossings of a single water of
the United States (i.e., a single waterbody) at a specific location. For linear projects
crossing a single or multiple waterbodies several times at separate and distant
locations, each crossing is considered a single and complete project for purposes of
NWP authorization. However, individual channels in a braided stream or river, or
individual arms of a large, irregularly shaped wetland or lake, etc., are not separate
waterbodies, and crossings of such features cannot be considered separately.
Single and complete non-linear project: For non-linear projects, the term “single and
complete project” is defined at 33 CFR 330.2(i) as the total project proposed or
accomplished by one owner/developer or partnership or other association of
owners/developers. A single and complete non-linear project must have independent
utility (see definition of “independent utility”). Single and complete non-linear projects
may not be “piecemealed” to avoid the limits in an NWP authorization.
Stormwater management: Stormwater management is the mechanism for controlling
stormwater runoff for the purposes of reducing downstream erosion, water quality
degradation, and flooding and mitigating the adverse effects of changes in land use on
the aquatic environment.
Stormwater management facilities: Stormwater management facilities are those
facilities, including but not limited to, stormwater retention and detention ponds and best
management practices, which retain water for a period of time to control runoff and/or
improve the quality (i.e., by reducing the concentration of nutrients, sediments,
hazardous substances and other pollutants) of stormwater runoff.
Stream bed: The substrate of the stream channel between the ordinary high water
marks. The substrate may be bedrock or inorganic particles that range in size from clay
to boulders. Wetlands contiguous to the stream bed, but outside of the ordinary high
water marks, are not considered part of the stream bed.
Stream channelization: The manipulation of a stream’s course, condition, capacity, or
location that causes more than minimal interruption of normal stream processes. A
channelized jurisdictional stream remains a water of the United States.
Structure: An object that is arranged in a definite pattern of organization. Examples of
structures include, without limitation, any pier, boat dock, boat ramp, wharf, dolphin,
weir, boom, breakwater, bulkhead, revetment, riprap, jetty, artificial island, artificial reef,
permanent mooring structure, power transmission line, permanently moored floating
vessel, piling, aid to navigation, or any other manmade obstacle or obstruction.
Tidal wetland: A tidal wetland is a jurisdictional wetland that is inundated by tidal waters.
Tidal waters rise and fall in a predictable and measurable rhythm or cycle due to the
gravitational pulls of the moon and sun. Tidal waters end where the rise and fall of the
water surface can no longer be practically measured in a predictable rhythm due to
masking by other waters, wind, or other effects. Tidal wetlands are located channelward
of the high tide line.
Tribal lands: Any lands title to which is either: 1) held in trust by the United States for
the benefit of any Indian tribe or individual; or 2) held by any Indian tribe or individual
subject to restrictions by the United States against alienation.
Tribal rights: Those rights legally accruing to a tribe or tribes by virtue of inherent
sovereign authority, unextinguished aboriginal title, treaty, statute, judicial decisions,
executive order or agreement, and that give rise to legally enforceable remedies.
Vegetated shallows: Vegetated shallows are special aquatic sites under the 404(b)(1)
Guidelines. They are areas that are permanently inundated and under normal
circumstances have rooted aquatic vegetation, such as seagrasses in marine and
estuarine systems and a variety of vascular rooted plants in freshwater systems.
Waterbody: For purposes of the NWPs, a waterbody is a “water of the United States.” If
a wetland is adjacent to a waterbody determined to be a water of the United States, that
waterbody and any adjacent wetlands are considered together as a single aquatic unit
(see 33 CFR 328.4(c)(2)).
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, CHARLESTON DISTRICT
69A HAGOOD AVENUE
CHARLESTON, SOUTH CAROLINA 29403-5107
FINAL REGIONAL CONDITIONS FOR THE 2021 NATIONWIDE
PERMITS IN CHARLESTON DISTRICT (SAC)
Effective Date for Modified Regional Conditions for 16 NWPs: January 19, 2022
Effective Date for Regional Conditions for 41 NWPs: February 25, 2022
Expiration Date for Regional Conditions for All NWPs: March 14, 2026
This Regional Condition document supersedes all prior Regional Condition
documents for the Charleston District.
A. BACKGROUND/APPLICABILITY
1. The following regional conditions have been approved by the Division Engineer
for the South Atlantic Division (SAD) for use in the Charleston District (SAC) for
the following Nationwide Permits (NWPs):
a. The NWPs published in the January 13, 2021 Federal Register (86 FR 2744)
announcing the reissuance of twelve (12) existing NWPs (that is, NWPs 12,
21, 29, 39, 40, 42, 43, 44, 48, 50, 51, and 52) and issuance of four (4) new
NWPs (that is, NWPs 55, 56, 57, and 58), as well as the reissuance of NWP
general conditions and definitions with some modifications. These 16 NWPs
were effective on March 15, 2021 and will expire on March 14, 2026; and
b. The NWPs published in the December 27, 2021 Federal Register (86 FR
73522) announcing the reissuance of the remaining unmodified forty (40)
existing NWPs (that is, NWPs 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 13, 14, 15, 16,
17, 18, 19, 20, 22, 23, 24, 25, 27, 28, 30, 31, 32, 33, 34, 35, 36, 37, 38, 41,
45, 46, 49, 53, and 54) and issuance of one (1) new NWP (that is, NWP 59).
At this time, NWPs 26 and 47 are reserved. These 41 NWPs will be effective
as of February 25, 2022 and will expire on March 14, 2026.
2. Status of Activities Under Prior NWPs and/or Regional Conditions.
i. 16 NWPs: The modified regional conditions that were issued on January 19,
2022 and are incorporated in this document supersede the previous regional
conditions that were approved for the 16 NWPs that went into effect on March
15, 2021, except for the following scenarios:
1. NWP verification letters for one or more of the 16 NWPs that were issued
prior to January 19, 2022; or
2021-2022 NWP REGIONAL CONDITIONS FOR CHARLESTON DISTRICT (SAC)
Page 2 of 9
2. NWP activities that do not require a pre-construction notification (PCN)1,
are covered by one or more of the 16 NWPs, and have either
commenced, are under contract to commence, or have been completed
prior to January 19, 2022.
ii. 40 NWPs: For information about whether an activity can continue under the
2017 versions of the 40 existing NWPs (for example, the status of prior permit
verifications and pre-construction notifications) and, accordingly, the 2017
Regional Conditions, see the discussion in the Reissuance and Modification
of Nationwide Permits at 86 FR 73522 in Section I.D. on page 73525 or
contact the Charleston District Regulatory Office directly.
3. The following regional conditions will provide additional protection for the aquatic
environment that is necessary to ensure that the NWPs authorize only those
activities with no more than minimal adverse environmental effects.
4. As specified, under NWP General Condition 27, Regional and Case-By-Case
Conditions: The activity must comply with any regional conditions that may have
been added by the Division Engineer (see 33 CFR 330.4(e)) and with any case-
specific conditions added by the Corps or by the state, Indian Tribe, or U.S. EPA
in its Section 401 Water Quality Certification, or by the state in its Coastal Zone
Management Act consistency determination.
B. EXCLUDED WATERS AND/OR AREAS
Not applicable.
C. REGIONAL CONDITIONS APPLICABLE TO ALL NWPs
1. Use of nationwide permits does not preclude requirements to obtain all other
applicable Federal, State, county, and local government authorizations.
2. NWP activities are not authorized in areas known or suspected to have sediment
contamination, with the exception of the following: (1) activities authorized by
NWP 38; (2) activities authorized by NWP 53 when used in combination with
NWP 38; (3) sediment sampling for dredging projects authorized by NWP 6; and
(4) activities authorized by NWP 20.
3. For all proposed activities, both temporary and permanent, that would be located
within a FEMA designated floodway, the prospective permittee must submit a
PCN to the District Engineer in accordance with General Condition 32.
1 The acronym “PCN” used throughout this document refers to Pre-Construction Notification, as defined in
NWP General Condition 32.
2021-2022 NWP REGIONAL CONDITIONS FOR CHARLESTON DISTRICT (SAC)
Page 3 of 9
4. For all NWPs, the prospective permittee must submit a PCN to the District
Engineer in accordance with General Conditions 31 and 32, for any activity that
would be located in or adjacent to an authorized USACE Civil Works project,
including Federal Navigation projects:
a. USACE Civil Works projects: Buck Creek in Horry County, Eagle Creek in
Dorchester County, Kingstree Branch in Williamsburg County, Sawmill
Branch in Berkeley and Dorchester Counties, Scotts Creek in Newberry
County, Socastee Creek in Horry County and Turkey Creek in Sumter
County, Wilson Branch in Chesterfield County, Edisto River in Orangeburg
and Dorchester Counties, North Edisto River in Aitken and Orangeburg
Counties, Folly Beach in Charleston County, Hunting Island Beach, waste
water treatment plant and water line in Beaufort County, Myrtle Beach in
Georgetown and Horry County, Pawleys Island Beach in Georgetown County,
Edisto Island Beach in Charleston County, Crab Bank in Charleston
County, Morris Island Lighthouse in Charleston County, Miller Corner
Disposal area Phragmites Control in Georgetown County, Cape Marsh
Management area (Santee Coastal Reserve) in Charleston County, Murphy
Island in Charleston County, Pocotaligo River and Swamp in Clarendon and
Sumter Counties, Pinopolis Dam in Berkeley County, Battery Pringle in
Charleston County, Castle Pinckney in Charleston County, Pompion Hill
Chapel along the Cooper River in Berkeley County, Drayton Hall in
Charleston County, Indian Bluff in Orangeburg County, Singleton Swash at
Shore Drive in Horry County, Turkey Creek Bridge at Pineview Drive in
Lancaster, Big Dutchman Creek Bridge at West Oak Drive in Rock Hill, SC,
Calabash Branch Bridge at Tom Joye Road in Clover, Blue Branch Bridge at
Fortanberry Road in Gaffney, Glenn Creek Bridge at Sulphur Springs Road in
Spartanburg County, Cow Castle Creek (Bowman) in Orangeburg County,
Cowpen Swamp at Simpson Creek in Horry County, Crabtree Swamp in
Horry County, Saluda River (North, South, and Middle Fork) in Greenville
County, Shot Pouch Creek in Sumter County, Simpson Creek in Horry
County, and Todd Swamp in Horry County.
b. Defined Federal Navigation projects: Ashley River (0.5 miles east of Hwy 7
bridge downstream to the Atlantic Intracoastal Waterway (AIWW)), Atlantic
Intracoastal Waterway ((AIWW) GA/SC line to SC/NC line), Brookgreen
Garden Canal, Calabash Creek, Charleston Harbor (including the Cooper
River, Town Creek, Shem Creek to Coleman Blvd and Mount Pleasant
Channel), Folly River, Georgetown Harbor (Winyah Bay, Sampit River and
Bypass Channel), Jeremy Creek, Little River Inlet, Murrells Inlet (Main Creek),
Port Royal Harbor, Shipyard River, Savannah River (Below Augusta) and
Town Creek McClellanville (i.e., Five Fathoms Creek, AIWW to Bulls Bay).
c. Undefined Federal Navigation projects: Adams Creek, Archers Creek
(From intersection with Beaufort River for 2 miles), Edisto River (River mile
0.00 to 175.0), Great Pee Dee River (Waccamaw River via Bull Creek then to
2021-2022 NWP REGIONAL CONDITIONS FOR CHARLESTON DISTRICT (SAC)
Page 4 of 9
Smith Mills, then to Cheraw), Lynches River/Clark Creek (Clark Creek to
Lynches River, River Mile 0.0 to 56.0), Mingo Creek (to Hemmingway Bridge),
Salkehatchie River (5 miles above Toby’s Bluff to Hickory Hill, River mile 20.4
to 62.3), Santee River (Closed to navigation at mile 87 (Santee Dam)),
Waccamaw River (river mile 0.0 to 90 (state line)), Wateree River (Mouth to
Camden), and Village Creek (Morgan River to Porpoise Fish Co., 2.2 miles).
5. For all proposed activities that would be located in or adjacent to an authorized
Federal Navigation project, as referenced in Regional Condition C.4.b, the
project drawings must include the following information: (1) State Plane
Coordinates (NAD 1983) for a minimum of two corners of each structure or fill
where it is closest to the Federal channel; (2) the distance from the watermost
edge of the proposed structure or fill to the nearest edge of the Federal channel;
and (3) Mean Low Water line and the Mean High Water line.
6. For all NWPs requiring a PCN and when the activity involves the discharge of
dredged or fill material into waters of the U.S. associated with mechanized land
clearing that results in the permanent conversion of forested or scrub-shrub
wetlands to herbaceous wetlands, the PCN should include the following
information: (1) a written description and/or drawings of the proposed conversion
activity and (2) acreage of the permanent conversion.
D. REGIONAL CONDITIONS APPLICABLE TO SPECIFIC NWPs
1. For NWP 3, paragraph (a) activities, the prospective permittee must submit a
PCN to the District Engineer in accordance with General Condition #32 for the
repair, rehabilitation or replacement of existing utility lines, which include electric
lines and/or telecommunication lines, constructed over navigable waters of the
United States (i.e., Section 10 waters), and existing utility lines, electric lines,
telecommunication lines and/or pipelines routed in or under navigable waters of
the United States (i.e., Section 10 waters), even if no discharge of dredged or fill
material occurs.
2. For NWP 3, the prospective permittee must submit a PCN to the District
Engineer in accordance with General Condition 32, for maintenance activities
related to stormwater management that would occur in tidal waters, including
tidal wetlands.
3. For NWPs 3, 11, 12, 13, 14, 15, 20, 22, 33, 57, 58, and 59, temporary structures,
fills, and/or work, including the use of temporary mats, are authorized for the
minimum amount of time necessary to accomplish the work, which shall not
exceed a period of 180 days without additional Corps approval. However,
te
mporary sidecast material authorized by NWPs 12, 57, or 58 cannot ever
exceed a period of 180 days. The temporary structures, fills, and/or work,
including the use of temporary mats, shall be removed as soon as the work is
2021-2022 NWP REGIONAL CONDITIONS FOR CHARLESTON DISTRICT (SAC)
Page 5 of 9
complete and the disturbed areas be restored to pre-construction contours and
conditions.
The temporary mats include timber mats, metal, synthetic and/or
artificial mats, or other materials that may serve the purpose of mats.
4. For NWPs 3, 11, 12, 13, 14, 15, 20, 22, 33, 57, 58 and 59 that require PCNs and
when the activity involves temporary structures, fills, and/or work, including the
use of temporary mats, the PCN should include the following information: (1) a
written description and/or drawings of the proposed temporary activities that will
be used during project construction; (2) the timeframe that the proposed
temporary activities will be in place; and (3) specifications of how pre-
construction contours will be re-established and verified after construction.
Temporary mats include timber mats, metal, synthetic and/or artificial mats, or
other materials that may serve the purpose of mats.
5. For NWPs 7, 12, 14, 16, 17, 21, 29, 31, 35, 39, 40, 42, 43, 44, 49, 50, 51, 52, 57
and 58 in accordance with General Condition 22(a) and for NWPs 3, 8, 10, 13,
15, 18, 19, 22, 23, 25, 27, 28, 30, 33, 34, 36, 37, 38 and 54, in accordance with
General Condition 22(b), the ACE Basin National Estuarine Research Reserve
and the North Inlet Winyah Bay National Estuarine Research Reserve are
Designated Critical Resource Waters. Activities described in the NWPs listed
herein are subject to the limitations and/or PCN requirements listed in General
Condition 22 (a) and (b).
6. For NWPs 7 and 58 activities that involve intake structures, the associated intake
structure must be screened to prevent entrainment of juvenile and larval
organisms, and the inflow velocity of the associated intake structures cannot
exceed 0.5 feet/second.
7. For
NWPs 12, 57 and 58 activities that involve horizontal directional drilling
beneath
navigable waters of the United States (i.e., Section 10 waters), the PCN
should include a proposed remediation plan (i.e., frac-o ut plan).
8. For NWPs 12, 14, 29, 39, 46, 51, 52, 57 and 58 activities that involve crossings,
all culverts must be adequately sized to maintain flow. For these activities that
require submittal of a PCN, the PCN should include the minimum size of and
number of culvert/pipes that are proposed.
9. For NWPs 12, 14, 18, 43, 51, 57 and 58, the prospective permittee must submit a
PCN to the District Engineer in accordance with General Condition #32, for
activities that involve the loss of greater than 0.005 acre of stream bed.
10. For NWPs 12, 14, 18, 21, 29, 39, 40, 42, 43, 44, 50, 51, 52, 57, 58 and 59,
activities that involve the loss of greater than 0.005 acre of stream bed,
compensatory mitigation will be required and the PCN should include a
compensatory mitigation plan.
2021-2022 NWP REGIONAL CONDITIONS FOR CHARLESTON DISTRICT (SAC)
Page 6 of 9
11. For NWPs 12, 14, 18, 21, 27, 29, 39, 40, 42, 43, 44, 50, 51, 52, 57, 58, and 59,
the discharge cannot cause the loss of greater than 0.05 acre of stream bed.
12. For NWPs 29 and 39, the discharges of dredged or fill material for the
construction of stormwater management facilities in perennial streams are not
authorized.
13. For NWP 33, the prospective permittee must submit a PCN to the District
Engineer, in accordance with General Condition #32, for temporary construction,
access, and dewatering activities that impact greater than 0.1 acre of non-tidal
waters of the United States, including wetlands. In addition, the PCN should
include a restoration plan.
14. For existing NWP 48 activities that involve changing from bottom culture to
floating or suspended culture OR proposed NWP 48 activities that involve
floating or suspended culture, the prospective permittee must submit a PCN to
the District Engineer in accordance with General Condition #32.
15. For proposed NWP 48 activities involving floating or suspended culture and/or
proposed NWPs 55 and 56 activities that will occur adjacent to property that is
not owned by the prospective permittee, the PCN should include the following
information:
a. A map or depiction that shows the adjacent property(ies) and adjacent
property owners’ contact information. Note: This information may be obtained
online from the applicable county’s tax information pages.
b. A signed letter(s) of “no objection” to the proposed mariculture activity from
each of the adjacent property owner(s). Each letter shall include the name,
mailing address, property address, property Tax Map Parcel (TMS) number,
and signature of the property owner. Or, if the prospective permittee is unable
to obtain a letter(s) of "no objection", the Corps will notify the adjacent
property owner(s) of the proposed project by letter wherein the adjacent
property owner will be given 15 days to provide comments.
16. For NWP 53, the PCN should include a Tier I evaluation, in accordance with the
Inland Testing Manual, for the project area immediately upstream of the low-
head dam. If the Tier I evaluation indicates contaminated sediments are present,
a Tier II evaluation may be required.
17. The prospective permittee is advised of the following for activities under any
NWP for which (1) the 401 Water Quality Certifications (WQC) were denied (see
F.1.a), and/or (2) activities under the NWP were found to be inconsistent with the
S.C. Coastal Zone Management Program and, therefore, concurrence with the
Coastal Zone Consistency determination was denied (see F.2.a), and/or (3) the
2021-2022 NWP REGIONAL CONDITIONS FOR CHARLESTON DISTRICT (SAC)
Page 7 of 9
proposed activity is located in one of the “Critical Areas” of the Coastal Zone (see
F.3):
a. For NWPs 12, 14, 16, 17, 21, 23, 29, 34, 39, 44, 46, 49, 50, 54, 57, 58 and 59
where WQC was denied, the prospective permittee should provide to the
Corps a copy of the Individual WQC or evidence demonstrating a waiver was
granted.
b. For NWPs 12, 14, 16, 17, 21, 23, 24, 29, 34, 35, 39, 42, 44, 46, 49, 50, 51,
55, 56, 57, 58 and 59 where concurrence with the Coastal Zone Consistency
was denied, the prospective permittee should provide to the Corps a copy of
the Individual CZC Concurrence or presumed concurrence for the proposed
activity.
c. For all NWPs in any of the “Critical Areas” of the Coastal Zone, an Individual
Critical Area permit is required (see F.3). Therefore, the prospective permittee
should provide a copy of the Individual Critical Area permit to the Corps for
the proposed activity.
Note: For WQC conditions on activities under NWPs 43, 51, and 52, see F.1.b.
For Coastal Zone Consistency conditions on activities under NWPs 43 and 52,
see F.2.b.
18. For NWPs 12, 57 and 58, the prospective permittee must submit a PCN to the
District Engineer in accordance with General Condition 32 if the activity involves
the discharge of dredged or fill material into waters of the U.S. associated with
mechanized land clearing that results in the permanent conversion of forested or
scrub-shrub wetlands to herbaceous wetlands for a maintained right-of-way.
E. ACTIVITY SPECIFIC REGIONAL CONDITIONS
Not applicable.
F. SECTION 401 WATER QUALITY CERTIFICATION (WQC) AND/OR COASTAL
ZONE MANAGEMENT ACT (CZMA) CONSISTENCY DETERMINATION
SUMMARY AND APPLICABLE CONDITIONS
1. Water Quality Certification (WQC)
a. WQC Denied
The Water Quality Certifications (WQC) for the following NWPs are denied;
therefore, an Individual WQC, or evidence demonstrating a waiver was
granted, from the South Carolina Department of Health and Environmental
Control (SCDHEC) will be required for authorization under these NWPs:
2021-2022 NWP REGIONAL CONDITIONS FOR CHARLESTON DISTRICT (SAC)
Page 8 of 9
NWPs 12, 14, 16, 17, 21, 23, 29, 34, 39, 44, 46, 49, 50, 54, 57, 58 and 59.
b. WQC Granted With Conditions
The following WQC Conditions, as stated in the SCDHEC’s Notice of
Department Decision dated November 25, 2020, are also considered 2021
NWP Regional Conditions:
i. For NWP 43, “Activities authorized by this certification are limited to
maintenance of existing facilities, such as stormwater ponds, detention and
retention basins, water control structures, outfall structures, emergency
spillways, and existing ponds, that are proposed for use as water quantity or
volume control. This NWP cannot be used for existing ponds that are
proposed to be converted into water quality treatment facilities, such as
sediment basins, sediment traps, or other similar structures.”
ii. For NWP 51, “This NWP is not certified for activities that cause the loss of
more than 300 linear feet of stream bed.”
iii. For NWP 52, “This NWP is not certified for activities that cause the loss of
more than 300 linear feet of stream bed.”
c. WQC Granted Without Conditions
The WQCs for NWPs 3, 4, 5, 6, 7, 13, 15, 18, 19, 20, 22, 25, 27, 30, 31, 32,
33, 36, 37, 38, 40, 41, 42, 45, 48 and 53 were granted without conditions.
d. No WQC Required
NWPs 1, 2, 8, 9, 10, 11, 24, 28, 35, 55 and 56 do not require WQCs.
2. Coastal Zone Consistency (CZC)
a. CZC Concurrence Denied
The following NWPs were found to be inconsistent with the S.C. Coastal Zone
Management Program; thus, the CZC concurrence is denied and an
Individual CZC concurrence, or presumed concurrence for the proposed
activity, will be required for these NWPs:
NWPs 12, 14, 16, 17, 21, 23, 24, 29, 34, 35, 39, 42, 44, 46, 49, 50, 51, 54,
55, 56, 57, 58 and 59.
b. CZC Concurrence Granted With Conditions
2021-2022 NWP REGIONAL CONDITIONS FOR CHARLESTON DISTRICT (SAC)
Page 9 of 9
The following CZC Conditions, as stated in the SCDHEC’s Notice of
Department Decision dated November 25, 2020, are also considered 2021
NWP Regional Conditions:
i. For NWP 43, “Activities authorized by this certification are limited to
maintenance of existing facilities, such as stormwater ponds, detention and
retention basins, water control structures, outfall structures, emergency
spillways, and existing ponds that are proposed for use as water quantity or
volume control. This NWP cannot be used for existing ponds that are
proposed to be converted into water quality treatment facilities such as
sediment basins, sediment traps, or other similar structures.”
ii. For NWP 52, “This NWP is not certified for activities that cause the loss of
more than 300 linear feet of stream bed.”
c. CZC Concurrence Granted Without Conditions
The CZCs for NWPs 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 13, 15, 18, 19, 20, 22, 25,
27, 28, 30, 31, 32, 33, 36, 37, 38, 40, 41, 45, 48 and 53 were granted without
conditions.
d. No CZC required
Not applicable.
3. Coastal Zone Consistency (CZC) General Condition
The following CZC General Condition, as stated in the SCDHEC 401/CZC Letter
dated December 14, 2020, is considered a 2021 NWP Regional Condition:
For all NWPs, “Activities in the Critical Areas (as defined in 48-39-10, R
30.1(D) and R 30.10) require a direct permit from SCDHEC OCRM. SCDHEC
OCRM’s action on direct critical areas permits will serve as the consistency
determination for the critical area activity.”
G. DISTRICT POINT OF CONTACT
Tracy D. Sanders
USACE- Charleston District
69A Hagood Avenue
Charleston, South Carolina 29403
843-329-8044
Tracy.d.sanders@usace.army.mil
SAC.RD.Charleston@usace.army.mil
SC nFPARTMENT of
EXVIROH[,IENTAt
SERUICES
September 30,2024
Distant lsland Community Association
31 1 Carteret Street
Beaufort, 5C 29902
5q65 EEIE EEe? h166 U38h Ee
Re: OCRM05450
Dear Distant lsland Community Association:
The Bureau of Coastal Management (the Department) has reviewed your application to construct a community
bulkhead on Distant lsland, Beaufort, Beaufort County, South Carolina and has issued a permit for this work. you should
carefully read the description of the authorized project and special conditions that have been placed on the permit, as
these conditions may modify the permitted activity, ln addition, there are a series of general conditions that should be
reviewed' The original and one photocopy of the permit, as issued, are enclosed. After carefully reading the permit, ifyou wish to accept the permit as issued, sign and date in the signature block entitled "PERMITTEE" on the original
version of the permit and return it to this Department. Keep the photocopy for your records.
PLEASE READ CAREFULLY: You are required to sign and return the original version of your permit to thisDepartment within thirtv (30) days. S.c. code Ann. s 48-6-30(DX2) provides, 'within thirty calendar days after themailing of a decision [pursuant to S.C. Code Ann.5 48-6-30(DX1)], an applicant, permittee, licensee, certificateholder, or affected person desiring to contest the department decision may request a contested case hearingbefore the Administrative Law Court, in accordance with the Administrative procedures Act.,'
In order to request a construction placard, please submit a critical area placard request through epermitting.
You must send in this request before the time you wish to start construction. At that time a constructionplacard will be sent to you to post at the construction site.
PLEASE NOTE: You are not authorized to commence work under the permit until we have received the original version
of the entire permit signed and accepted by you, and a construction placard has been issued and posted ai the
construction site. The receipt of this permit does not relieve you of the responsibility of acquiring any other federal,
state, or local permits that may be required. Please return the signed permit to the following address:
Bureau of Coastal Management
104 Parker Drive
Beaufort, SC 29906
a Valiulis
Project Manager
Critical Area Permitting Section
,
Enclosure
cc; Mr. Blair Williams, Critical Area permitting Section Manager
SCANNED t
cLrENr #-&)!-
info@des.sc.gov I des,sc.gov | 803.898.3432
SOUTH CAROLINA DEPARTMENT OF ENVIRONMENTAL SERVICES
BUREAU OF COASTAL MANAGEMENT
CRITICAL AREA PERMIT & COASTAL ZONE CONSISTENCY CERTIFICATION
Permittee(s):
Permit Number(s):
Date of lssuance:
Expiration Date:
Location:
Distant lsland Community Association
ocRM05450
September 30,2024
September 30,2029
sffiffi $pffi#$Ah
#ffiruffi8T$ffiFd(S)
on and adjacent to Distant tsland creek on lots 82,94,86, 89, go,92,94, 98,1oo,1oz, 106,
and 6 community owned easement lots on Distant lsland, Beaufort
Beaufort county, south carolina ((TMS#: R123 018 000 0768 0000 (5 community
easements); Rl23 018 000 0666 0000 (community boat landing easement); Rl23 018 000
0650 0000 (lot 82); R123 018 000 05G3 0000 (lot S4); ntZS 018 000 0637 0000 (tot 86); R123 018
000 0581 0000 (lot 88); Rl23 018 000 0638 0000 (tot 90); Rl23 018 000 0651 0000 (tot gz)i R123
018 000 0639 0000 (lot 94); R123 018 000 0653 0000 (tot 98); Rl23 018 0OO 0592 0000 (tot 100);
Rl23 018 000 0640 0000 (lot 102); R123 018 0OO 0533 0000 (tot 106))
This permit is issued under the provisions of S. C. Code Ann, Section 48-39-10, et seq., and 23A S.C. Code Ann. Regs. 30-.1
through 30-18, os amended, Please carefully read the project description and special conditions th"t "pp""ionthis permit/certification as they will affect the work that is allowed and may modify the work from that shown
on the submitted plans. All special conditions attached to the permit will take precedent over submitted plans.
The general conditions are also a part of this permit/certification and should be read in their entirety. The S. C.
contractor's Licensing Act of 1999, enacted as s.C. Code Ann. section 4o-11-5 through 430, requires that all construction
with a total cost of $5,000 or more be performed by a licensed contractor with a valid contractor's license for marine
class construction, except for construction performed by a private landowner for strictly private purposes. your
signature on and acceptance of this permit denotes your understanding of the stated law regarding use of licensed
contractors. All listed special and general conditions will remain in effect for the life of the permit. This applies topermittee, future property owners, or permit assignees.
DESCRTPTTON OF THE PROJECT
As Proposed: lnstall approximately 1565 LF bulkhead and seven (7) tree wells along Distant lsland creek for thepurpose of shoreline Stabilization.
As Authorized: To replace the existing bulkhead and install a new bulkhead at the following properties on Distant
lsland: lots 82, 84,86,88,90, 92,94,98, 100, 102,106, and 6 community owned easement lots. specifically, to install a
total of '1565 linear feet of bulkhead, 8'- 15' high, no further than 18" from the critical area line verified on August 1st,
2024.7 tree wells are authorized along the bulkhead with varying distances seaward from the critical area line, ai shown
in the attached drawings, The purpose of the project is for erosion control forthe Distant lsland Community.
SPECIAL CONDITIONS
The proposed bulkhead is no fufther than 18" from the critical area line verified on 0810112024, aside from the 7
proposed tree wells, as shown in the revised drawings submitted on 0g12212024.
All scrap treated wood and other debris is removed from the area prior to filling, and only clean fill dirt or sand is used as
backfill. The earthen banks adjacent to the bulkhead must be stabilized with a vegetative cover as soon as possible after
construction to minimize erosion.
2
toPll
3
$ffiffi spffiffiHAfl_
ffiffiruffiffTfiffiru{s}
Any disturbed critical area adjacent to the construction site must be restored to original contours anC conOitions uponproject completion.
4. Once the project is initiated, it must be carried to completion in an expeditious manner in order to minimize the period ofdisturbance to the environment.
5. The bulkhead should be located in a manner so as to minimize disturbance to shellfish resources or in an area void ofshellfish resources. lf this requires the relocation of this structure, notification to DES-BCM is required and written
approval for the relocation must be received from DES-BCM prior to construction.
6. An as-built survey of the entire erosion control structure must be submitted to the Department within g0 days of the
expiration date of the final construction placard. The survey must be performed by a registered land surveyor, must
show all components of the structure, and must list the starting and ending coordinates of the structure in the'SC State
Plane Coordinate System, which can be obtained by survey-grade Global Positioning System equipment.
7. ln the event that any historic or cultural resources and/or archaeological materials are found during the course of work,
the applicant must notifo the State Historic Preservation Office and the South Carolina lnstitute of Archaeology and
Anthropology. Historic or cultural resources consist of those sites listed in the National Register of Historic places and
those sites that are eligible for the National Register. Archaeological materials consist of any items, fifty years old or
older, which were made or used by man. These items include, but are not limited to, stone projectile points (arrowheads),
ceramic sherds, bricks, worked wood, bone and stone, metal and glass objects, and human skeletal materials.
?. 'e Jl
sffiffi spffiffi$AL
ffiffiruffisrsffiru(s)
PERMITTEE'S ATTENTIoN ls DIRECTED To GENERAL coNDtIoNs NUMBERS FouR (4)AND FtvE (5).By AccEpfnrucE or
THIS PERMIT, PERMITTEE IS PLACED ON NOTICE THAT THE STATE OF SOUTH CAROLINA, BY ISSUING THIS PERMIT, DOES
NOT WAIVE ITS RIGHTS TO REQUIRE PAYMENT OF A REASONABLE FEE FOR USE OF STATE LANDS AT A FUTURE DATE IF
SO DIRECTED BY STATUTE.
THE PERMITTEE, BY ACCEPTANCE OF THIS PERMIT AGREES TO ABIDE BY THE TERMS AND CONDITIONS CONTAINED
HEREIN AND TO PERFORM THE WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS ATTACHED
HERETO AND MADE A PART HEREOF.ANY DEVIATION FROM THESE CONDITIONS, TERMS, PLANS AND SPECIFICATIONS
SHALL BE GROUNDS FOR REVOCATION, SUSPENSION OR MODIFICATION OF THIS PERMIT AND THE INSTITUTION OF
SUCH LEGAL PROCEEDINGS AS THE DEPARTMENT MAY CONSIDER APPROPRIATE.
Permit Number: OCRM05450
o-
PERMTTTEE(S)
Distant lsland Association
DATE
CRITICAL AREA PERMITTING PROJECT MANAGER
Sophia Valiulis
Or Other Authorized State Official
DATE
3 o( t?
GENERAL CONDITIONS:
$ffiffi spffiffisAil
cffirurysrsryru($)
This construction and use permit is expressly contingent upon the following conditions which are binding on the
permittee:
1' The permittee, in accepting this permit, covenants and agrees to comply with and abide by the provisions and
conditions herein and assumes all responsibility and liability and agrees to save the Department and the State
of South Carolina, its employees or representatives, harmless from all claims of damage arising out of
operations conducted pursuant to this permit.
2. lf the activity authorized herein is not constructed or completed within five years of the date of issuance, this
permit shall automatically expire. A request, in writing, for an extension of time shall be made not less than
thirty days prior to the expiration date,
3. All authorized work shall be conducted in a manner that minimizes any adverse impact on fish, wildlife and
water quality.
This permit does not relieve the permittee from the requirements of obtaining a permit from the U. S. Army
Corps of Engineers or any other applicable federal agency, nor from the necessity of complying with all
applicable local laws, ordinances, and zoning regulations, This permit is granted subject to the rights of the
State of South Carolina in the navigable waters and shall be subject, further, to all rights held by the State of
South Carolina under the public trust doctrine as well as any other right the State may have in the waters and
submerged lands of the coast.
5. This permit does not convey, expressly or impliedly, any property rights in real estate or material nor any
exclusive privileges; nor does it authorize the permittee to alienate, diminish, infringe upon or otherwise restrict
the property rights of any other person or the public; nor shall this permit be interpreted as appropriating
public properties for private use.
6. The permittee shall permit the Department or its authorized agents or representatives to make periodic
inspections at any time deemed necessary to ensure that the activity being performed is in accordance with the
terms and conditions of this permit.
7 . Any aba ndon ment of the perm itted activity will req uire restoration of the a rea to a satisfactory cond ition as
determined by the Department
8. This permit may not be transferred to a third party without prior written notice to the Department, either by
the transferee's written agreement to comply with all terms and conditions of this permit or by the transferee
subscribing to this permit and thereby agreeing to comply.
9. lf the display of lights and signals on any structure or work authorized herein is not otherwise provided for by
law, such lights and special signals as may be prescribed by the United States Coast Guard shall be installed and
maintained by and at the expense of the permittee.
1 0. The permit construction placard or a copy of the placard shall be posted in a conspicuous place at the project
site during the entire period of work.
11. The structure or work authorized herein shall be in accordance with the permit, as issued, and shall be
maintained in good condition. Failure to build in accordance with the permit, as issued, or failure to maintain
the structure in good condition, shall result in the revocation of this permit.
4.
q DP Il
sffiffi $pH#$AL
c$ruDrTssru{$}
12. The authorization for activities or structures herein constitutes a revocable license, The Department may
require the permittee to modiry activities or remove structures authorized herein if it is determined bythe
Department that such activity or structures violates the public's health, safety, or welfare, or if any activity is
inconsistent with the public trust doctrine. Modification or removal under this condition shall be ordered only
after reasonable notice stating the reasons therefore and provision to the permittee of the opportunity to
respond in writing. When the Permittee is notified that the Department intends to revoke the permit, Permittee
agrees to immediately stop work pending resolution of the revocation.
13, The Department shall have the right to revoke, suspend, or modify this permit in the event it is determined the
permitted structure (1) significantly impacts the public health, safety and welfare, and/or is violation of Section
48-39-150, (2) adversely impacts public rights, (3) that the information and data which the permittee or any
other agencies have provided in connection with the permit application is either false, incomplete or inaccurate,
or (4) that the activity is in violation of the terms and/or conditions, including any special conditions of the
permit. That the permittee, upon receipt of the Department's written intent to revoke, suspend, or modify the
permit has the right to a hearing, Prior to revocation, suspension, or modification of this permit, the
Department shall provide written notification of intent to revoke to the permittee, and permittee can respond
with a written explanation to the Department,(South Carolina Code Section 1-23-370 shall govern the
procedure for revocation, suspension or modification herein described).
14. Any modification, suspension or revocation of this permit shall not be the basis of any claim for damages
against the Department or the State of South Carolina or any employee, agent, or representative of the
Department or the State of South Carolina,
15, All activities authorized herein shall be, if they involve a discharge or deposit into navigable waters or ocean
waters, at all times consistent with all applicable water quality standards, effluent limitations, and standards of
performance, prohibitions, and pretreatment standards established pursuant to applicable federal, state and
local laws.
16. Extremecareshall beexercisedtopreventanyadverseorundesirableeffectsfromthisworkonthepropertyof
others. This permit authorizes no invasion of adjacent private property, and the Department assumes no
responsibility or liability from any claims of damage arising out of any operations conducted by the permittee
pursuant to this permit.
5 b( J'l
arGG #tr"ffiq/E#qk
ffiffiNrysTnffiru{s}
DIRECTIONS TO SITE FROM CHARLESTON:
_TAKE CALHOUN ST TO SC-30 W
-TAKE SC_61 N TO HWY 17 S
_CONTINUE ON HWY 17 S TO BEAUFORT COUNTY
_TAKE EXIT TO HWY 21 S AND CONTINUE SOUTH
-TAKE RIGHT ONTO CHOWAN CRK BLF
-TAKE RIGHT ONTO DISTANT ISLAND DR
PROJICT VICINITY
SCALE: 1" : 6000'
MOSSY OAKS
HWY-21
PROJECT LOCATION
DISTANT ISLAND,
(LoTS 8o-118)
BEAUFORT SC, 29907
LATITUDE: 32.3884 N
LONGITUDE:80.6359 W
PORT ROYAL
PURPOSE: SHORELINE STABILIZATION
AD.'ACENT PROPERTY OW.IERS:
SEE SCHEDULE SHEET 16
APPUCANT
DISTANT ISLAND COMM- - --:AliE[r::McSWEENEY ENGINEL
1 "=6000'
1 2000'
VI
FIGURE 1
CINITY MAP
ASSOC., tNC.
RS. LLC
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
COUNTy OF: BEAUFORT, SC
REVlSlOll NO: 2
SIIEET: 1 oF 16 DATEz 8/22/2024
PROPOSED:
WATERWAY:
U,P lr
sffiffi spffiffiHd$-K_
DIRECTIONS TO SITE FROM CHARLESTON:
_TAKE CALHOUN ST TO SC-30 W
_TAKE SC_61 N TO HWY 17 S
-CONTINUE ON HWY 17 S TO BEAUFORT COUNTY
_TAKE EXIT TO HWY 21 S AND CONTINUE SOUTH
-TAKE RIGHT ONTO CHOWAN CRK BLF
_TAKE RIGHT ONTO DISTANT ISLAND DR
PROJICT LOCATION
SCALf: 1" : 4OO0'
GIBBS
PROJECT LOCATION
DISTANT ISLAND,
(Lors Bo-118)
BEAUFORT SC, 29907
LATITUDE: 32.3884 N
LONGITUDE:80.6359 W
SLANDI
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW OIU}.IERS:
SEE SCHEDULE SHEET 16
FIGURE 2
LOCATION MAP
1 "=4000'
Sooo'
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC.
AGENT
McSWEENEY ENGINEERS. LLC
PROPOSED:
WATERWAY:
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
COUNW 0F: BEAUFORT, SC
REVISION NO: 2
SIIEET: 2 oF 16 DATET 8/22/2024
1ot )1
1 4"O
12-O
12'CH.
r o"cH'i6'LO
22"Lo r
21"LO
17"1O
ors,
7'lt>
Qno30"to
21 "LO .
i{"ip
17"1O
FOUND
LOT 86
NATIIAN K SMITH R€VIRUST OF
2OOE SMIfr ZACHARY DIXON
t,
r 3'LA
t5"u
9"O
fo"ro
i z'pe
. tJ"Lo.
14"U
16"1A .
14"SUB
U
N v
NAIL IN
" sffiffi spffiffiHA
SEAWALL
vVw
ffiffiruffiHTHffiru{S}
v v3"
S
v .,.*$
v
NAIL IN
SEAWALL
v
v j
iL v
o'",
b 40)
oA /,tto^ <"1"
Vt, vo
""or31'i
?*'
v
g
/*^*(v-
v
{,
v
DES_BCM CRITICAL LINE
AND EXISTING SEAWALL IRON v
FOUND
v
v v LOT E4
ROBERT C. ROLFE
DIANE C, ROLFEv
v
v voo
v
i9
IRON PIN
REBAR
FOUND
vel
V FOUND
vg
v
@
v
ll'to. FOUND
ir'ro
v
Vo
v
v
J,
'ni56.. LOT 82
JOHN SAMUEL O'BRIANI JR.
MARY BETH O,BRIANTif
v
RIP
s v
v
vv
v ! 22"Lo
lo"Lov.
LOT 80
'zt"to DISTANT ISLAND CO. LP
v^r+"pl v9'
FOUND I6'LA 12'9 FOUND
TXISTING SITt PLAN-LOTS BO- 86
SCALE: 1:60
NOTE: THIS DRAWING lS FOR
PERMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PERFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST '1,
2024.
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
coUNTY OF: BEAUFORT, SC
REVISION NO: 2
SHEEI 3 oF 16 DATE: 8/22/2024
PROPOSED:
WATERIYAY:
ESIBL|I
EXISTING SITE PLAN LOTS 80-86
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC
AGENT
McSWEENEY ENGINEERS. LLC
120'
1: 60
6o'
PURPOSE: SHORELINE STABILIZATIOI.
ADJACENT PROPERW OWIIERS:
SEE SCHEDULE SHEET 16
t, )P tf
JAN
2s'LO'
20'LA.
1 SIPA
l+'pn
14JLA
g"LO .
,r.po 3o.ro'
iz'pe
i+'pr
u'o"ro
13'U
1E"O. 9.gg "il"CH
14"O.
16'LA
1s"u11"u
8"LO:7"1O
2"A
8"LO
LOT 92
YARAUAN ZAVAN YARAUAN,
LORRAINE M
580 DISTANT ISLAND DR, BEAUFORT,
sc 29907
FOUND
15-U.9"1A,,rJ-[A. il"LA
to'ri
14,'6 .1a"o.
12"O'
17"LO
JO'LO
21 "LO .
t2"cH .
to'cn'16'LO.
22'LO r
24"LO
N p A
iC .,.
NAIL IN
W E
ffiffiruffiHTHffiru{ffi}
v
V NAIL IN
s *.
i9v
,/q"""(w-
oz^
ba4oooo'g
oa)a+^
"t'&+
'qn
vv
v v
NAIL IN
SEAWALL
v v wd
v
v
v v
-
+DES_BCM
CRITICAL LINE
AND EXISTING
SEAWALL
v
v
v
v
NAIL INV
v
NAIL IN
SEAWALL
vV
v s30
v *$
v
NAIL IN
SEAWALL
*
.:t 't-
v ^5
v!,
FOUND
LOT 90
KATHRYN SMOKE TRUST
NOTE: THIS DRAWING lS FOR
PERIVITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PERF-ORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
FOUND
LOT 88
BENJAMIN BLAKE SCANDLEN
AMANDA ALICE SCANDLEN
FOUND
%
LOT 86 vc
NATHAN K SMITH REV NUST OF
2OOA SMIff ZACHARY DIXON
/4,e
EXISTING SITt PLAN-LOTS BB-92
AN D COM VlU N ITY ACCTSS LOTS
SCALE: 1:60
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW OIVT'IERS:
SEE SCHEDULE SHEET 16
IXISTING SITE PLAN LOTS 88-92AND CON/IVUNITY ACCESS LOT
APPUCANT
DISTANT ISLAND COMM.
AGENT
McSWEENEY ENGINEE
FICURE 4
60' 120'
t: ou
ASSOC., tNC.
RS. LLC
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
couNTY on BEAUFORT, SC
REVISION NO: 2
sHEEn 4 OF 16 DATEz 8/22/2024
PROPOSED:
WATERWAY:
1 o( xl
o49'LO
j)e"Lo
TERSIDE
IN
SEAWALL'
9'CH
le"ro
1I'MAG -
I7'MAG'
FOUND
-
JO"LO
LOT 100
GEORGE F. EVANS
\z"o
/fua
34"1O 3
25'LO.
40'LOa
23'LO
1 /2"
REBAR
FOUND
L
LOT 9A
AARON P. SARATHY
JENNIFER K. WALLACE
iL
v
NAIL IN
vv
N NAJL IN
SE{,{VALL9
Ew
s
/fk/ '<\
v
vo.o,b
a+,
oa-to-
,a u+a
'"% hr"
V%*
rg
vi,
v
v
v
g
v
IN
v
v
v
v
v
v
v
irv
v
v
vv
v
vv
i9v
.,. ig
ib
it
v
DES-BCM
CRITICAL LINE
AND EXISTING
SEAWALL
vv
NAIL IN
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PERFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
NOT PARIICIPATING IN BULKHEAD REPLACEMENT
LOT 96
BERGMAN JOINT REV. TRUST
FOUND
effiffi qffi
Ed&EE&s qdH
loT 94
JAN T, MCLAREN LIVINC TRUST
ffiffiruffifiTHffiru(
g-LO .
TXISTING SITt PLAN-LOTS 9+. 98 & 1OO
AND COMMUNITY ACCTSS LOT
SCALE: 1:60
NOTE: THIS DRAWING IS FOR
PERMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
couNw oF: BEAUFORT, SC
REVlSlO,l NO: 2
SFIEET: 5 oF 16 DAIEr 8/22/2024
PROPOSED:
IYATERIYAY
ESTBE.I
EXISTING SITE PLAN LOTS 94.98&1OO
AND COMMUNITY ACCESS LOT
AEEICANT
DISTANT ISLAND COMM. ASSOC., INC.
AGEttlT
McSWEENEY ENGINEERS. LLC
1: 60
120'0'
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW OIYT,IERS:
SEE SCHEDULE SHEET 16
lo oP t'l
NOl PARTICIPANNG IN BULKHEAD REPLACEMENT
LOT lOE
2021 MICHELLE N. GARONER
REVOCABLE TRUST
DAVID SCOIT PROUT
REVOCABLE LIVING TRUST
1 /2"
REBAR
BRICK
PIT
FOUND
DIST.
1 E"LO .
s
WEATH
,2'LO
az"to
s 89'08'28" W
a LOT 106
RILEY LIVING IRUST
R123 018 000 0768 0000
DISTANT ISLAND COMM. ASSOC. INC.
N
I
E
NOT PARTICIPATING IN BULKHEAD REPLACEMENT
LOT 104
FAITH MCALHANEY HARPER
REVOC. TRUST
2t'LO
a42"LO
9"O
2t"u.
24'O.
NOTE: THIS DRAWING lS FOR
PERMJTTING PURPOSES ONLY AND
IS NOT TO BE USED TOR
ENGINEERING DESIGN OR
CONSTRUCTION.
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PERFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
(i-
v- v
{,
s 75'20'1{
*,7.1
CREEK
\\XRSI\CRA59
v
vrN
o\91[N1
\+FNo
oPPog\\\c
v
1O ik
v
N
{,
NAIL IN
SEAWALL
s 80'51'16" W
13-O1' v
w E
!,
i9
VV
&
NAIL
i&
S
-s
ff?
vv
{,
v rN
@
DISTANT ISLAND CREEK
..-t350' TO OPPOSTNG MARSHCRASS
v v
t1
v
g{!
ov1
NAIL IN
srnwlll v I
A\
#)\r/
ffiffi
!{tE?E
$*grrgE
ffi
@
#;
ffi
&3
&
v
glL
v
FOUND
DES-BCM
CRITICAL LINE
AND EXISTING
SEAWALL
i, ib
v *E
* LoT 102
OONALD I. PRATT, JR.
GERALOINE O. PRATT
v
v
NAIL IN
srX.waug
rg
v
aas'10
29"10
v FOUND
v,
EXISTING SITI PLAN-LOTS 102 & 106
AN D CON/ N/ U N ITY ACCESS tOT
SCALE: 1: 60
tril tltll
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW Ol{l,lERS:
SEE SCHEDULE SHEET 16
FIGURE 6
SITE PLAN LOTS 1OO
COMMUNITY ACCESS L
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC
AGENT
McSWEFNFY ENGINEERS. LLC
bU
60'0'
EXISTING
AND
& 102
OT
120'
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
COUNW OR BEAUFORT, SC
REVlSlS.l NO: 2
SHEEI 6 oF 16 DATEr 8/22/2024
PROPOSED:
IYATERWAY:
l( Dt )l
.J4
@l
BLAND
BLAND
MATTHEW W
ANARA H.
1A'U
ls[8:
N
w E
1 /2"
REBAR
s
NOT PARTICIPATING IN BULKHEAD REPLACEMENT
LOT 114
DISTANT ISLAND CO. LP
27"A a
FOUND
I /2"
REBAR
NOT PARTICIPATING IN BULKHEAD REPLACEMENT
LOf 112
DISTANT ISLAND CO, LP
8"1O11'PA
31"ua
D\S1AN1
Asgoc
roNR"".on'*
NAIL IN
12"PA
l')
ov
v iL
v
v
!,
i&
v
Vv
v
v
FOUND
v
PK
v
PK
FOUND
v
NAIL IN
SEAWALL
NOT PARTICIPATINC IN BULKHEAD REPLACEMENT
LOT'l'10
NOT PARTICIPAI1NG IN BULKHEAD REPLACEMENT
LOT 108
2021 MICHELLE N. GARDNER
REVOCABLE IRIJST
OAVID SCOTT PROUT
REVOCABLE LIVING IRUST
FOUND
1 /2"
REBAR
BRICK
PIT
FOUND
DIST.
WLLIAM H. CHAIFIELD
ANNE W. CHATFIELD
22"O .
18-10 .
v
VG Vo
v
d%
€ffi\s#ryffi*
ffi
@
h
EEIC!!Ed
ffiffiffiffi
Vv
$,-
v ie * "JF,
s 75'20'14'
v7
CREEK
o??os\\\G
v(N
t2"LO
12"rc
D\S1AN1
\+AND
g
IL
v
1O ig
v
NAIL IN
EXISTING SITE PLAN
CON/MUNITY ACCESS LOT
SCALE: 1: 60
NOTE: THIS DRAWING lS FOR
PIRMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINTERING DESIGN OR
CONSTRUCTION.
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PIRFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
COUNTY OF: BEAUFoRT, Sc
REVISION NO: 2
SHEEI 7 oF 16 DATE: 8/22/2024
PROPOSED:
WATERTYAY:
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW Ol$,lERS:
SEE SCHEDULE SHEET 16
BSIEEJ
EXISTING SITE PLAN
COMMUNITY ACCESS LO
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC,
AGENT
McSWEENEY ENGINEERS. LLC
60
60'
T
1
o'
lr op J'7
N
w E
$ffiffi spffiffiHAH-
ffiffiFWffiffiTHffitrW(S3
s
LOT 120
DISTANT ISLAND CO.
BOAT LANDING
FOUND
Dtsr.v
{, v
v ir
vs
v
I s'LO
'1g'LO
v
R
F1
i&
L99 v 1t
v
v 1,2
vv
v
v
v v
la
vv v
DES-SCM v i9 v
--Re
r88
CRITICAL LINE
AND EXISTING
SEAWALL
vvv
TACK
h
ooQ$ ,nt"*
-. $'
s$-"t€
oQ'
SEAWALL I}
t G
*,
v
(o
v
iL
{9
v
^o FOUNI
v
TXISTING SITE PLAN
BOAT LANDING
SCALE: 1: 60
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERTY OIYI.IERS:
SEE SCHEDULE SHEET 16
FIGURE 8
EXISTING SITE PLAN- BOAT LANDING
1: 60o' 60' 12o'
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC.
AGENT
McSWEENEY ENGINEERS. LLC
PROPOSED:
ITATERWAY:
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
coUNTY OF: BEAUFORT, SC
REVISION NO: 2
SHEEI 8 oF 16 DATEz 8/22/2024
t3 6f- e]
ta'o
1 7'LO .
1 2'CH .
l6.,LO.1O"CH'
22"LO I,1't 6 or.s,
4+o
,orn
*,
ib
VV
v
v
v
NAIL
i&
NAIL IN
SEAWALL
21'Lo .
i9
v
0'10'
i9
v
FOUND
IRON
v v
v v
FOUND
LOT 86
NAfrAN K SMIIH REV RUST OF
2OOA SMIH ZACHARY DIXON
v
t,
'12'PA
r 3"LA
15"4
13'LO
1
e"ei
' 9'OiL
v
{,
IRON PIN
v
v
1'oi56r
1r"Lo. FOUND
ir-uo
FOUND
LOT 84
ROBERT C. ROLFE
DIANE C. ROLFE
t4"su8
N
sffiffi,%pffiffiH
w "mffiruffiBTHffiffS{ffi
s
IMPACTS:
BACKFILL AND BEDDING
1523 ACRES
441 CUBIC YARDS
PROPOSEO TREE
rt/ELL #2
(139 SF F|LL)
,/"Y^"'(v"
Ozn
b"4",oo^ ,a'b^ '"1,n2t,'YO
"'"*3$-
6
't
PROPOSED
TREE WELL #I
(r45 SF F|LL)
DES-BCM CRITICAL LINE
AND EXISNNG SEAWALL
PROPOSED BULKHEAD
PROPERTY BOUNDARY
FOUND
v
v
v
v
v
@ LOT 82
JOHN SAMUEL O'BRIANT, JR.
MARY BETH O'ERIANTi9 v v
v
lO,BULKHEAD
RETt'RN v v
r+"ci
J' v
v
o
22"LO .
I o"LO .
'zt"Lo
iL
v
LOT 80
DISTANT ISLAND CO. LP
vsl
1 /2"
REBAR
r'o-re
FOUND
P R OP OSED SITE PLAN-LOTS BO-86
SCALE: 1: 60
!tllnr
NOTE: THIS DRAWING lS FOR
PERMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PERFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
BULKHEAD
DISTANT ISLAND CREEK
IN: BEAUFORT
couNw oF: BEAUFORT, SC
REV|S|ON NO 2
SHEEI 9 oF 16 DAIEz 8/22/2024
PROPOSED:
ITATERWAY:
ADJACENT PROPERW Olll.lERS:
PURPOSE:
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC.
AGE}.IT
McSWEENEY ENGINEER
LOTS 80-86
1: 60
BSIEE.g
SITE PLAN
60'o'
PROPOSED
S. LLC
lq o{' 21
v
NAIL
iL
v
v
vig
V NAIL IN
v
JAN
1 6'PA
I3"PA
iz'es
20"u .
2s"Lo'lYPA
lr"pe
9"LO .
14'pa .2O"LO'
v
NAIL IN
SEAWALL
vv
v
-o
i3"u
1cO.
1E"O. g,'CH -il"CH
l8'LA .
15'LA1l'LA.
v
*1
v
8"LO
2"U
8"LO:7'Lo
LOT 92
YARALIAN ZAVAN YARAUAN,
LORRAINE M
580 OISIANT ISLAND DR, BEAUFORI.
sc 29907
FOUND
v
v
NAIL IN v t5'U.9'LA-.
l5"LA ! 11-LA
1 o-LA
14"o.1a,,o.
12"O'
N
ffi spffiffifiAL
w E
ffiffiruffifi"ffitr{"?ru{ffi}
S PROPOERTY BOUNDARY
/'Y.e
PROPOSED
4"o
+r'4'r^
."";h,.
IMPACTS:
BACKFILL AND BEDDINC
1323 ACRES
441 CUBIC YARDS PROPOSED TREE
WELL #3
(149 SF F|LL)
DES_BCM
CRITICAL LINE
AND EXISTING
SEAWALL
22'Loi
24"rc
1 7'LO
16-LO
t2"cH .
to'cx'
v
28'
v
v
vV
v
v
v
NAIL
v
NAIL IN
SEAWALL
21 "LO .
FOUND
LOT 90
KATHRYN SMOKE TRUST
NOTE: THIS DRAWING lS FOR
PERMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
ALL CRITICAL LINE INFORIUATION
IS OBTAINED FROM A PLAT
PERFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
1 /2"
REBAR
FOUND
LOT 88
BENJAMIN BLAKE SCANDLEN
AMANDA AUCE SCANDLEN
REBAR
FOUND
ors"
44o
4>n+o
;::ip
c^
"u,,
LOT 86
NATHAN K SMIfr REV NUST OF
2OO8 SMIN ZACHARY OIXON
\ /4'^
REBAR
PROPOSED SITE P I AN - LOTS BB-92
AND COMMUNITY ACCESS LOTS
SCALE: 1:60
Itiltit
PROPOSED: BULKHEAD
IYATERIVAY: DISTANT ISLAND CREEK
IN: BEAUFORT
COUNW OF: BEAUFORT, SC
REVISIo}{ NO: 2
SHEET: 10 oF 16 Dl:lEt 8/22/202+
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW OIIT'IERS:
SEE SCHEDULE SHEET 16
FIGURE 10
ROPOSED SITE PLAN LOTS
AND COMMUNITY ACCESS
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC.
60
60'
P
0'
AGENT
EY ENGINEER
120'
88-92
LOT
McSWEEN S. LLC
15 oP x.-l
NAIL IN
SEdfuALL
15
3e"rn
DONALD I. PRATT, JR.
GERALDINE O. PRATT
v
v
NAIL IN
v
2'
$
*,t
vl-
I
ENT
v
v
IN
SEAWALL
la-ro
r1'MAG -
t7"MAc j
I
FOUND
JO"LO
a
LOT 100
GEORGE F. EVANS
iz'o
/,VC
"or"
2J"LO.
{"Loa
v
v*
v
v
v
IMPACTS:
EIERFM AND BEDDING
1J23 ACRES
44,I CUBIC YARDS
N
w E
s
/sYs/ '<'
v
v
v
v
{4 i&
vt0'
vv
PROPOSEO BULKHEAD v
PROPOSED
1O' BULKHEAD RETURN
PROPOSED TREE WELL #5
(276 SF F|LL)
DES-BCM
CRITICAL LINE
ANO EXISTING
SEAWALL
WELL #4
sF F|LL)
1 /2"
REBAR
FOUND
t
LOT 98
AARON P. SARAIHY
JENNIFER K. WALLACE
NAIL
IN
!.
NOT PARTICIPATING IN BULKHEAD REPLACEMENT
LOT 96
BERGMAN JOINT REV TRUST
FOUND
$ffiffi spH
ffiffiruffiffTHffiN
f
t
r 6'PA
LOT 94
JAN T. MCLAREN LIVING ]RUST
g"LO .
j {:pA 3O"LO'
@
S AN-LOTS 9+ 9B & 10c
AND COMMUNITY ACCTSS LOT
SCALT: 1:60
NOTE: THIS DRAWING lS FOR
PERMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PERFORN/ED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
PROPOSED: BULKHEAD
IYATERVUAY: DISTANT ISLAND CREEK
IN: BEAUFORT
couNTY oF: BEAUFORT, SC
REVIS|oN NO 2
SFIEET: 11 oF 16 DtilEz 8/22/2024
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERTY OI{I{ERS:
SEE SCHEDULE SHEET 16
FIGURE 11
PROPOSED SITE PLAN LOTS 94,98&1OO
AND COMMUNITY ACCESS LOT
1: 60o' 60' 120'
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC.
AGENT
McSWEENEY ENGINEERS. LLC
Itp r[' )r
o
FOUND
IN BULKHEAD
LOT 108
1 /2"
REBAR
NOT PARTICIPATING REPLACEMENT
BRICK
FIRE PIT
FOUND
DIST.
2021 MICHELLE N. GARDNER
REVOCABLE TRUST
DAVID SCOTT PROUT
REVOCABLE LIVING TRUST
FOUND
18"10.
22'O .
lXLo
?z'ro
WEA
LOT 106
RILEY LIVING TRUSTa"cH
16"0
TBMS
6'02" W 1
v
NAIL
1'
1 /2"
REBAR
[u',
R123 018 000 0768 0000
DISTANT ISLAND COMM. ASSOC. INC.
9
IN
25'0.
19;bhs
.1 8"O
J7,P^
v
NOT PARTICIPATING IN BULKHEAD REPLACEMENT
LOT 104
FAI'TII MCALHANEY HARPER
REVOC. TRUST
v
!,
*,
I
24"O.
31"1o
o42"LO
9"O
15'
NAIL IN
seA(verr
I
(i.
vv v
s 75'20'14"
*7.
PKF
u
12'
CREEK
*'ARs$GRNss
v
srN
o\s1FN1
rs$No
o?Pos\\\c
v
1O lO,BULKHEAD RETURN
v v
N
ig
NAIL
SEAWALL
s 80'51'16"
13.01
w E
PROPERTY BOUNDARY
PROPOSED BULKHEAO !,1
s v
PROPOSED TREE WELL #7
(124 SF F|LL)
i-R
sv
10'BULKHEAD RETURN
g -N
@
DISTANT ISLAND CREEK
-t350'
TO OPPOSING MARSHGRASS
{, v
iL
IMPACTS:
B=TdRFILL AND BEDDING
1323 ACRES
441 CUBIC YARDS
v J,'
10' BULKHEAD RETURU
NAIL IN
SEAWALL v
PROPOSEO IREE WELL #6
(294 SF F|LL)
'15
PROPOSED BULKHEAD
PROPERTY BOUNDARY FOUND
DES-BCM
CRITICAL LINE
AND EXISTING
SEAWALL
PROPOSED 'IREE WELL #5
(276 SF F|LL)
LOT 102
DONALD I. PRATT, JR.
GERALDINE O. PRATT
$ffiffi spffiffifiAt
v 26
ffiffiruffigTHffiN {s}
*,t
nl- FOUND
12'
v J9-Lo
v
PROPOSED SITE PLAN-LOTS 102 & 106
AND COMMUNITY ACCESS LOT
SCALT: 1:60
jlilr illl
NOTE: THIS DRAWING lS FOR
PERMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PERFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
PROPOSED: BULKHEAD
IIATERYUAY: DISTANT ISLAND CREEK
lN: BEAUFORT
COUNTY OF: BEAUFoRT, Sc
REVISION NO: 2
SFIEET: 12 oF 16 DAIET 8/22/2024
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW OITNERS:
SEE SCHEDULE SHEET 16
APPUCANT
DISTANT ISLAND COMM.
AGENT
McSWEENEY ENGINEER
100 & 102
S LOT
120'
RGURE 12
TE PLAN LOTS
MUNITY ACCES
1 60
60'0'
PROPOSED SI
AND COM
ASSOC., INC
S. LLC
(? ot- A7
-$4
l@l
e$
effi
&(ffi
e#
EM
H. BLAND
ldLA
'1t"t8:
N
w E
1 /2"
REBAR
FOUND
s
NOT PARTICIPATING IN BULKHEAD REPLACEMENT
LOT 114
DISTANT ISLANO CO. LP
FOUND
NOT PARTICIPANNG IN BULKHEAD REPLACEMENT
LOr 112
DISTANT ISLAND CO. LP
1 /2"
REBAR
8"1O11'PA
J1"uo
tsssoc
,onNR.".ot^tn
O\S1ANI
IN
12.PA
NOT PARTICIPATING IN BULKHEAD REPLACEMENT
LOT 110
s 77'02'49" W
12.56'
WLLIAM H. CHA]FIELD
ANNE U CHATFIELD
2A"LA
21'LA
NOT PARTICIPATING IN BULKHEAD REPLACEMENT
LOT108
2021 MICHELLE N. GARDNER
REVOCABLE TRUST
DAVID SCOTT PROUT
REVOCABLE LIVING IRUST
FOUND
1 /2"
REBAR
BRICK
PIT
FOUND
DIST.
,2"rc
iz"ro
ALL CRITICAL LINE INFORMATION
IS OBTAINED FRON/ A PLAT
PERFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
(9
v
PK
FOUND
& i&
v
*
iF
v
PK
FOUND
19
v v
1O' BULKHEAD
PROPOSED BULKHEAD
PROPERTY BOUNDARY
v
1O'BULKHEAD RETURN
v
v v L22
\O^
q\*
viL v
vrN
PKF
s 7520'14"
* 7.1
NEflI
h*@M
ffiEsffi
&
ffiffi
CRECK
o?PoS\\{G
iC
vrN
o\sIl*r
\SLANO i,
1O lO,BULKHEAD REN'RN
v v
v
NAIL
SEAWALL
PROPOSTD SITE PLAN
COMMUNITY ACCESS LOT
SCALE: 1:60
NOTE: THIS DRAWING lS FOR
PERMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
RGURE 13
OPOSED SITE PLAN
MUNITY ACCESS LO
APPIJCAUT
DISTANT ISLAND COMM. ASSOC., INC.
AGENT
McSWFFNFY FNGINEERS. LLC
60
60'
PR
coM T
1
120'o'
PROPOSED: BULKHEAD
WATERIYAY: DISTANT ISLAND CREEK
IN: BEAUFORT
COUNTY OF: BEAUFORT, SC
REVlSlOll NO: 2
SHEEI 13 oF 16 DATET 8/22/2024
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW OI{I'IERS:
SEE SCHEDULE SHEET 16
t( ac 07
27"Lo.v
vv
14
LOT 120
DISTANT ISLAND CO.
BOAT LANDINC
NO EXIS]ING
PRESENT.
PROPOSED
s BULKHEAD
v
v
s
*
I s"LO
19"1O
FLOAT
"Lo 26"10 191LO.
1 2"LO .
6"LO
21"LO . 12"PA
ALL CRITICAL LINE INFORMATION
IS OBTAINED FROM A PLAT
PERFORMED BY GASQUE &
ASSOCIATES INC. ON AUGUST 1,
2024.
N
w E
s sffiffi ffipffiffiBAt
mmfiwffiHTHffiN(S)
1O'BULKHEAD RETURN
PROPERTY BOUNDARY
PROPOSED
BULKHEAD
FOUND
Dtsr.lL
vv
vv
i[ 4A' iL
.vv v
10, BULKHEAD RETURN
PROPERry BOUNDARY DES-B.M v {4
--Rp
E8B
CRITICAL LINE
AND EXISTING
SEAWALL
VjrV
s TACK IN
c
SEAWALL V
g
Cus
o{
v
v iL
v ik
^o PK
FOUND
v
PROPOSED SITt PLAN
BOAT LANDING
SCALE: 1: 6O
NOTE: THIS DRAWING lS FOR
PERMITTING PURPOSES ONLY AND
IS NOT TO BE USED FOR
ENGINEERING DESIGN OR
CONSTRUCTION.
PROPOSED: BULKHEAD
TYATERTYAY: DISTANT ISLAND CREEK
IN: BEAUFORT
COUNW OF: BEAUFoRT, Sc
REVISION NO: 2
SHEEI 14 oF 16 DATEz 8/zz/2024
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW OlYl,lERS:
SEE SCHEDULE SHEET 16
EGIIELI.4
PROPOSED SITE PLAN- BOAT LANDING
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC.
AGENT
McSWEENEY ENGINEERS. LLC
0'
1: 60
60'
11 t? J?
CRITICAL LINE
PROPOSED
GRADE
18,' MAX.
sffiffi.$pffiffiHAt
-
EL VARIES
EXISTIN\,
ffiffiruffiHTHffiru(ffi?'
CLEAN GRANULAR
BACKFILL
aEBBox-r/r.w _
8'-15'
#57
GRA
GRANITE
VEL FILL
DEI/OLISH UPPER
HALF OF EXISTINC
BULKHEAD
TIMBER OR COI/POSITE
BULKHEAD
_ APPRoX._|VLW _
EXISTING
BULKHEAD
lrilIll
BULKHIAD SECTI ON
SCALT: 1:3
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW O$,|ERS:
SEE SCHEDULE SHEET 16
trGURE 15
BULKHEAD SECTION
1:3
3' 6'
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC
AGENT
McSWEENEY ENGINEERS. LLC
PROPOSED: BULKHEAD
WATERIYAY: DISTANT ISLAND CREEK
IN: BEAUFORT
COUNTY OF: BEAUFORT, Sc
REVISION NO: 2
SHEEI 15 oF 16 DATEI 8/zz/2o24
Xo a? 5f
ADJACENT PROPERTY TMS: OWNER ADDRESS:
1.
z.
3.
4.
6.
1,
9.
't0.
11.
12.
13.
14.
15.
'16.
17.
18.
Rl2J 018
R123 018
R12J 018
R123 018
R123 018
R123 018
R12J 018
R125 018
R123 018
R125 018
R123 018
R123 018
R123 018
R123 0i8
R123 018
Rl2J 018
R123 018
R125 018
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
0768
0650
0563
0637
0768
0581
06J8
0651
0768
0639
0653
076B
o592
0640
0768
0s33
0768
0666
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
1.
2.
4.
6.
DISTANT ISLAND CO LP
O,BRIANT JOHN SAMUEL JR
ROLFE ROBERT C ROLFE DIANE C
NATHAN K SMITH REV TRUST OF 2OO8 SMITH
ZACHARY DIXON
DISTANT ISLAND CO LP
SCANDLEN BENJAMIN BLAKE, SCANDLEN
AMANDA ALICE
KATHRYN K SMOKE TRUST
YARALIAN ZAVAN YARALIAN, LORRAINE M
DISTANT ISLAND CO LP
JAN T MCLAREN LIVNG TRUST
SARATHY AARON P WALLACE, JENNIFER K
DISTANT ISLAND CO LP
EVANS GEORGE F
PRATT DONALD I JR PRATT, GERALDINE O
DISTANT ISLAND CO LP
RILEY LIVING TRUST
DISTANT ISLAND CO LP
DISTANT ISLAND COMMUNITY ASSOC INC
1. 47O DISTANT ISLAND
2, 53O DISTANT ISLAND
3. 540 DISTANT ISLAND
4, 550 DISTANT ISLAND
5, 47O DISTANT ISLAND
6. 560 DISTANT ISLAND
7, 57O DISTANT ISLAND
8. 580 DISTANT ISLAND
9. 47O DISTANT ISLAND
10. 590 DISTANT ISLAND
11. 610 DISTANT ISLAND
12. 470 DISTANT ISLAND
13. 620 DISTANT ISLAND
14. 630 DISTANT ISLAND
15. 470 DISTANT ISLAND
16. 650 DISTANT ISLAND
17. 470 DISIANT ISLAND
18. 720 DISTANT ISLAND
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
DR, BEAUFORT,
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
sc 29907
7.
9.
10.
tt.
12.
13.
14.
15.
to.
17.
t6.
!tttntD.
f tt t
SHH $Pffi#HAt
ffiffitrwffisTffffiru{S}
PURPOSE: SHORELINE STABILIZATION
ADJACENT PROPERW OWiIERS:
SEE SCHEDULE SHEET 16
ADJACENT P
FIGURE 16
ROPERTY OWNERS MAP
SCALE: NTS
APPUCANT
DISTANT ISLAND COMM. ASSOC., INC.
AGENT
EY ENGINEERS, LLCMcSWEEN
PROPOSED: BULKHEAD
WAIERWAY: DISTANT ISLAND CREEK
IN: BEAUFORT
COUNW OF: BEAUFORT, Sc
REVlSlO,l NO 2
SHEEI 16 oF 16 DATEz 6/22/2024
At oP 3-l
ffiffiffi ffipffiffiHAL
ffiffiruffiflTfiffiru{s}
A-/l)
9-|t
q.7
J
:l:
f,
X
D<
cg
&
E
o
@rri r:
o.
TRET
NOTES:
i.) E &* \;! SSi 4SEN
^E M.aD 6 vrrr & $r*i rc fAL .1ls'm,
' E fficE oR *s4 d US. AW 6Edtuqs,isscJ|rutuM3) lrM t.Nil:.t@no{3ss c@sMt 4s..i &81 tr L'{i.e@nD ffi Ae[ ftc sGMMS NY M A' ST dflNd$ ..s FJ RRE$W A ffi WO oN @ .@6!NS ilLY & 6 NoIE WU 0F a m! $Nr6) CAmCAI&S & rcr F1 16S rc d 'Er*rHrumE 0R #sounr s*.z) l{ aaml@ 4 Mr rMmE ffi €a 16T-, ":J
b ffi@ft IHE dffict d $NM'tod d ,,.offi M. w I {ffii lr"r'sr ro*cNts@@sMlffis6 r ffimuro i'r '{: sft' E#e tu00 r€s ffiMlh x6& r'r &8MilUN6CGru9,)ESamSEffirirg.imsMSt' ftE W ffiL drt wi€ 4@r'l N sffildil{8ffffin'llMRm&ilrffiDrExM#''sffi'd' L e'. t'EL 13' & € e ri S kj{ru,}b Er.4r Elu cw-td N& &r3&rt9 Ms 9&3I. 2e1. {im &?:r'.) 6mq NRA € f-1etwcl- gluY rs ,s M0
6$lqs
l-'
v'
I
turtrfflsmrsm
u ffi t"3 PAol 1to
ro.Fr fl do e.a?-@ ***,r. t-l-,.
NEDffi2SK5'5
rt,ry d rl! N0 f@*c
tuT 9* rr trE 17J
mMwn'ffi
u&
MrFrn6|!r(4!dF,*
SHIIT 1
z)
i)
a
&)
7)
&l
s)
u!frmrffiaEffiLtffi@ dottc 1., s@E62sffi$t
W&SSD':@N@UF
tu_ w !r3 P|GE 17'
urftHsDcrclecM.M$.M@@*r49r7
tuislNNuis&F, 1N
ill &W t23 P&S t9!
dT tr E UNO Ng.M ffiF
Mffi 'ra41U6i d M uilD dMM CmF
ss etw $. 2@7
e,lt 3@ zga Pr€ sa
,?r tY &q# a 6asB, E,5:D #:[+( rai ?o10
ul sK 1!r FM ls
GASqUE
tN{D
& ASSOCIATES TNC.
ST'EVEYOX*I PLANNERS
shhrS416' E&lBlmNbmPn&astu roaH I&{ t &6)
&!hlffi:ffilUUtOb.S
TREE AND TOPOGRAPHICAL SURVEY
LOTS 80-118 DISTANT ISLAND
FREPARED FOR
MCSfEENEY ENGINEERS, tLC
DISTANT ISIAND
BEAUFORT COUNTY_**--SOTTTH CAROIINA
anfE 1l24t2nr1 saAF 1"=3C'
€*is#7liiii,.,':Jpiirro ccr pER o ,r.:-ocRMqiv$E) 7/15/2O2.-JPDATED CCL PER DES-BCM
=q6l:l- d*dF6
Uf O @'ss'u,@6r,v;.*d6
4 WF-$& Vi@ d@E affon SC.3, mx rs, ffi. tc(e) Q-1ro
MSMG*Effidlffiffi&4
,s-)(N.LOCAriir:
ffiffiffi ffifi*ffiffitrAtu
#ffi}ruffiHTtrffitrd
#€bqa"
e#
Itw
I
T)
L)J
oI gyMBols &
a
,clt
't:
tr
D<
Xo
'a-Ffii1E ffiSrt-- iil Pnc 54a
+
r/2!ROt SCT
t"-.*
LBEEI{S
BEAUFORT COUNTY-----SOUTH CAROLINA
GASQ{IE
talrD
& ASSOCIATAS INC.
SI'BIEYORS PIINIIEXtI /fr '//,///
OATE 1124/2A23 SCALE 1"=.10'
RF/|SED 5/3CI2324-UPOA-ED CCL FEC iIEC-C-lH
REVTSED 7/'3/2124-!PETD CCL PER 5:1 BCv
23 f:itr \). vlK o(F.i. 9t lls, ##', 53,
(sr) s-jru
qEffi@ryllq64
' L die d; rL!
s€c;r-Eii:
sHt[T 2 0r 6 4rDG ratlo 4
Sffiffi $PHCFAL
ffiffi$-$ffi$Tfrffiru{s}
eJ
_9
9-rF
qr
J
./i ](
Dri !!u1- r FiEslAL
@.1
l1 cl
Xo
a"*,*
I
I
LCam\ rrip (N.T"S.)
I
NOTM: li
1
.t
;l\i
I
!r
tu n€ M6 $dN aFEoN aa v!Ki:
Aro { -:ilE qecT p l.e ArTgituN.
1.) il6 e-q) q.r rcr HF
a) {_ edIec6wM* ffiuE moo.{) rif,4s 0r uxMD 6LG ,}: mc *irtl
t)n4ut@MAwn\ffiqnEliuREUEngl SLY @ g W H €,!r OF
^
lru sffi.
6-) cFrql$s e sr !l@ ro sm{.Mt,"rEI3*5ffiUffiffi.z) sE cwF! !s v hM@ oR s Nm
10 ffir1'r '-: tffi m ffid s at@idY 0n14lc ,8 &r lffi. ilUffi. il@.cssd Pf,lir* c\ &!@ Effi.& q& av :{ra vr 4 6ffi s fl6 j:r
6 9R$ tffi zs ilFOMmX B1 f 6ni' hRor& ari-s6 grf, @&rl ffi.s.-t x 6 Pe Ff,- * @ 40 GI d\Sm "r:{ OtrrqL effi E*E PUMS: AD C{
srcil o! ffi@m-
1!.) 1: riFLS ffi b S N R1S &M a'S-rC-r,'f & n. 1i a. r. r af L rr' s Mf,vNif, .*Ftu4 t.q mN-!r,,f( drqn srst6 s@ stlr2I Ar. ,1r'rm)r],j6.M ^14r1.rzJwre uflv a ;s Mm
,'',? t
I
J)
1) res f,zr sr6 06 o7s loo (Nm tr)t$,s.rlloiam@mTr{9 hrt3 0r& cb ffi 0&ld,s R!2S ora 60 6:7 iai
Y.U& frA Ot8 can 6el @,
r*3 Rl2! O:l ffi o.rt :srJr.!s RrE ota m s9 a*rri Rla u6 an & ,,#tu3. Rl- Ola @ @ i$:i
I!, h., ora &, tr.o &
r-!s hir 016 m 63 m
1 ls Ard dra d o:rz dmTJ,s Rt8 0!3 fr r.-b M1,_r ara or3 6 i:ir @
I
I
I
!-l
a
{)
1i
3.)
9,)
POT H N UM @NS'LIM GRF 4,.
EE
rg
nItul ft Hd R60RE CMme6 t*M... x6
m @. @s '$ 955
fuI B NE b\O g@TN llM
turflfrtNcMffit_!ruulo d$F 10. il7xs ffi ras PME 9t7
ui g wD coE4w cff, fc
F/r t* ris Fd 172
FJr d li d{0 cosuLTRe @p6r*,. JSrd f,q m7N @K Z4A PE {6
bre ME&,.sffim. ',.
&r s 1lr Pffi 1a
TREE AND TOPOGRAPHICAL SURVEY
LOTS BO-118 DISTANT ISLAND
PREPARED FOR
MCS'IfEENEY ENGINEERS, LtC
DISTANT ISLAND
BEIUFORT COUN-TT-----SOUTH CABOLI],IA
\aJF 1b4/ro)1 saatF ]"=JO'
c'm-srij lr7:07112+iJpii':.' ccr ):-R DHEc-ocRr.'
Rd s:t; 7/15/ ;ilq-uPM-Ei ccL r:R oEs-Bcu
fierlw*mrurc.G*M w*saFuq&
'ffiqffi,tffitqary6w// //1.',.,,' .- d /.2/
AASqUE & ASSOCHTES INC.
IA}ID SUFYEYCES PI.ANNE}S
2A trGrdy!{ \M cnc.E. FUFcq, s.cp.o. 6s rw\ sworT. si,(s9 5r2-r7r3
Mda&l1@416ru*Effidffimrsfiwe
t:rc-l UEil6 srttT I c[ 6 -.4r3r.f&r6eHe/r!4MF6
SrHffi Sf#ffi#Hdqfu
#ffi)Fdffi$Tff#frd
"4Fq'!'s
R&#-
t-r.4
I
-t('5
I
OT SYMBOLS &
!
6-F
p.
NTP
xxv
D< MNIOIR LIE
*t
"o
n *o .*^'*
@!6rrauqNMtsNM
F{NrcMfl@
t
q
CASQUS & ASSOCIATES INC.
IIINI) SDf,YEYONS PilfiNRS
I ruESO&lWro, AM&. SCro. M 1st, 8sF, 5,c
(s$il-la
E*itsiF.sctsE;.Efe
TREE AND TOPOGRAPHICAL SUR,VEY
LOTS BO-118 DISTANT ISLAND
PREPARED FOR
MCSWEENEY ENGINEERS, LtC
DISTANT I$LAND
BEAUFORT COUNTY----_SOUTH CAROUNA
DaIE t/24/2O23 SCA[! l"-3O'
REV,SED 5/30,/2024-'JPDATED cCL PsR DHEC-CCRM
I€iliED 7/15/2O24-JPDATED CCL PER DS-BCM
deffiarw!*84
iiilt-i;rc SHEIT 4 CF 6
sffiffi spffiffi$Atu
ffiffiF#ffiFT$ffift#{s}
l-)C
o.ri>
Q)
J
tt(
f,F
D<
o,s
trca
_ cBtfi urE
*' * "'"'t *^"*
Dl rk
44
I
3n
t
GASQIIE
I.AND
& ASSOCIATES INC.
AURVEYORS PIINNERS
TREE AND TOPOGRAPHICAL SURVRY
LOTS BO_118 DISTANT ISLAND
FRSPARED T'OR
MCSWEENEY ENGINEERS, LLC
DISTANT ISTAND
BEAUFOBT COUNTY-.---SOUTH CABOLINA
DATE i/24/2023 scALE l"-io'
Rs/tsD sj\t/zcz1-uplAr€D cc! pER DHEc-ocRv
RE\{S€D 7115,/2C22-U-}"ED CCL PER DES-BCLj
aRSMi|lMO*L!,ffi{d!,Pr, g lxq @r€, $.(s) 52-'El
wsm@ flEFr# sHr[T 5 0r 6 @rJrd rt,'o * ilE/r 5fr d.
sffi,H Rffim\Ll$r iJ ti-_j.i4ri
ffi$,&fu
ffi#Fdffi#Fs_*aEtr. ffiru
l-)J
a
t->
r.-)
J
&
F
B
X
X
F€r !, i^. E rh6rr&T Owft4i 2uF cstu*ilE Eclqrr L GFER st- stui G --rAEi v^L* i
os ytE
slE trit€R
-a**
LoCATi::\ MAp (N_LS.)
1.)
?.)
4.1
:)
..1
J,i
c)
r.)
)!.l
4
.fl
e)
I)
-l
4)
5;
1.)
s
a)
sl ?REE AND ?OPOGNAPIIICAT SURVEYLOTS BO_118
PBEPAAED FOR
:I{CS}YEENEY ENGINEERS, tLC
_ DISTAM ISL{NDauruFoRT c0ul{Ty_____s0uTH c.{RotL\A
i$!#3i#f#fi #iiE: rn g*=,m*
se-"e+Y:,x,I*H6FiS
6 @!rB r!1r@. h,v{ oe r, h
%f;*-J SHEI- 6 O
Permit Number: __________________________________
Name
of Permittee: _______________________________
Date
of Issuance: ________________________________
Date of Completion: ______________________________
Upon completion of the activity authorized by this permit and any mitigation required by the
permit, sign this certification and return it to the following address:
U.S. Army Corps of Engineers
Regulatory Division
69A Hagood Avenue
Charleston, South Carolina 29403-5107
Please note that your permitted activity is subject to a compliance inspection by an U.S. Army
Corps
of Engineers representative. If you fail to comply with this permit you are subject to
permit s
uspension, modification, or revocation.
==================================================================
I hereby certify that the work authorized by the above referenced permit has
been
completed in accordance with the terms and conditions of the said permit,
and required mitigation was completed in accordance with the permit conditions.
_________________________
Signature of Permittee
SAC.RD.Charleston@usace.army.mil
OR mail to:
______________________
Date