OAKWOOD TOWNHOMESCITY OF SPARTANBURG, SOUTH CAROLINA
EROSION CONTROL NOTES1.SUBJECT PROPERTY:TAX MAP NO. 7-12-08-074153 OAKWOOD AVENUECITY OF SPARTANBURG, SC 29302SOIL TYPE: URBAN LAND-CECIL, CECIL-URBAN LAND COMPLEX (HYDROLOGIC SOIL GROUP 'B')2.SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSTALLED AND FUNCTIONING PRIOR TO BEGINNING ANY PROJECT EARTHDISTURBING ACTIVITIES.3.TO SECURE THE PROJECT SITE, LOCATE LIMITS OF CONSTRUCTION, PROTECT AREAS THAT ARE TO REMAIN UNDISTURBED, ANDPREVENT MIGRATION OF CONSTRUCTION DEBRIS, ORANGE CONSTRUCTION FENCING SHALL BE INSTALLED AROUND AREAS NOTREQUIRING SILT FENCING. ANY ACCUMULATION OF CONSTRUCTION DEBRIS ON PUBLIC ROADWAYS OR ADJACENT PROPERTIESSHALL BE REMOVED WITHIN 24 HOURS. CARE SHALL BE TAKEN WHEN INSTALLING CONSTRUCTION FENCING TO NOT OBSCUREONCOMING TRAFFIC AT INTERSECTIONS, ADJACENT DRIVEWAYS AND THE PROJECT CONSTRUCTION ENTRANCE.4.CONTRACTOR(S) TO MAINTAIN EROSION CONTROL MEASURES UNTIL GRASSING IS ESTABLISHED. OWNER WILL BE RESPONSIBLEFOR EROSION CONTROL MAINTENANCE THEREAFTER.5.A CERTIFIED EROSION PREVENTION AND SEDIMENT CONTROL (CEPSCI) INSPECTOR SHALL BE MAINTAINED TO PROVIDEINSPECTION AND DOCUMENTATION OF EP&SC PRACTICES THROUGHOUT CONSTRUCTION IN ACCORDANCE WITH SCDHECREGULATIONS.6.THE CONTRACTOR SHALL PROVIDE A SUITABLE RAIN GAUGE ON SITE AND RECORD DAILY RAINFALL AMOUNTS. THE CONTRACTORSHALL NOTIFY THE INSPECTOR WITHIN 1 BUSINESS DAY IF A RAINFALL EVENT EQUAL TO OR GREATER THAN 0.5" HAS OCCURREDAT THE SITE.7.ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY SEVEN (7) DAYS AND WITHIN 24 HOURS AFTEREACH RAINFALL EVENT THAT PRODUCES 1/2 INCH OR MORE OF PRECIPITATION. DAMAGED OR INEFFECTIVE DEVICES SHALL BEREPAIRED OR REPLACED AS NECESSARY. WRITTEN INSPECTION REPORTS SHALL BE KEPT ON SITE. IF POSSIBLE, SUPPORTINGPHOTOGRAPHS SHALL ALSO BE RECORDED ALONG WITH THE INSPECTION REPORT. A WRITTEN MAINTENANCE RECORD OF ALLREPAIRS TO SEDIMENT/EROSION CONTROL DEVICES SHALL ALSO BE MAINTAINED AND KEPT ON SITE. REGULAR MAINTENANCESHALL ALSO BE PERFORMED INCLUDING REMOVAL OF SILT FROM AROUND CATCH BASINS AND REPAIR CONSTRUCTIONENTRANCE AS NEEDED TO PREVENT OFFSITE SEDIMENTATION.8.ANY MODIFICATIONS FROM THE APPROVED PLANS TO THE SEDIMENT/EROSION CONTROL FEATURES INSTALLED ON SITE SHALL BERECORDED WITH INITIALS AND DATE ON THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) AND THE DESIGN ENGINEERSHALL BE NOTIFIED. THE DESIGN ENGINEER SHALL BE NOTIFIED IF ANY MAJOR CHANGES IN THE SWPPP ARE REQUIRED.9.ALL DISTURBED AREAS SHALL RECEIVE TOPSOIL & BE GRASSED IN ACCORDANCE WITH THE FOLLOWING SPECIFICATIONS:A.LIME: 2 TONS PER ACREB.FERTILIZER: 1000 LBS PER ACRE OF 10-10-10C.SEED: PER GRASSING SCHEDULE DETAILD.MULCH: 1.5 TONS PER ACRE - WHEAT STRAWIF TEMPORARY VEGETATION IS REQUIRED TO ASSIST IN SILTATION CONTROL, FOLLOW THE GRASSING SCHEDULE DETAIL.10.SOIL DISTURBANCE SHOULD BE LIMITED TO AREAS BEING ACTIVELY WORKED. STABILIZATION MEASURES SHALL BE INITIATED ASSOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLYCEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED.11.SLOPES STEEPER THAN 3:1 AND/OR EXCEEDING EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH FLEX TERRA ORSYNTHETIC/VEGETATIVE MATS IN ADDITION TO HYDRO SEEDING. TEMPORARY SLOPE DRAINS SHALL BE INSTALLED AS NECESSARYDURING CONSTRUCTION WHERE SAID SLOPES EXCEED EIGHT (8) VERTICAL FEET.12.CAT TRACK OR SURFACE ROUGHENING IS REQUIRED FOR ALL SLOPES GREATER THAN 4:1 PRIOR TO SEEDING AND LYING OFSYNTHETIC OR VEGETATIVE MATS. CAT TRACKING OR SURFACE ROUGHENING SHALL PRODUCE A SURFACE WITH FURROWSRUNNING ACROSS THE SLOPE, PARALLEL WITH SLOPE CONTOURS, AND PERPENDICULAR TO SURFACE RUNOFF.13.SILT FENCES SHALL BE CLEANED OR REPLACED WHEN SEDIMENT REACHES 1/3 HEIGHT OF THE FENCE OR WHEN THE SILT FENCEBECOMES INEFFECTIVE, WHICHEVER COMES FIRST.14.PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITYCONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THEUTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER ISENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE BEING PUMPED BACKINTO WATERS OF THE STATE.15.SILT FENCE SHALL BE INSTALLED ALONG LINES OF EQUAL ELEVATION. TIE BACKS SHALL BE INSTALLED EVERY 100 LINEAR FEETALONG THE FENCE LINE.16.SILT FENCING SHALL BE PLACED NO CLOSER THAN 5 FT. DOWNHILL FROM THE TOE OF ANY FILL AREA.17.ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL COMPLETIONOF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BEREQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFF SITE SEDIMENTATION. ALL TEMPORARYCONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED.18.DURING THE COURSE OF CONSTRUCTION ACTIVITIES EROSION AND SEDIMENT CONTROLS SHALL BE USED TO PREVENT SEDIMENTACCUMULATION ON PUBLIC ROADWAYS (INCLUDING STREET GUTTERS), SEDIMENT LADEN RUNOFF FROM ENTERING INTO EXISTINGSTORM WATER SYSTEM INLETS OR DEPOSITING ON ADJACENT PROPERTIES, AND AIRBORNE DUST MIGRATION OFF-SITE. ANYACCUMULATION OF SEDIMENT FROM THE PROJECT SITE ON PUBLIC ROADWAYS OR ADJACENT PROPERTIES SHALL BE REMOVEDWITHIN 24 HOURS.19.THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO THE PAVED ROADWAY FROMCONSTRUCTION AREAS. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED.20.THE CONTRACTOR SHALL CONTROL DUST AS NECESSARY USING DUST CONTROL BMPs INCLUDING PROJECT PHASING,VEGETATIVE COVER, MULCH, SPRINKLING WATER, BARRIERS AND/OR COVERS.21.TEMPORARY STOCKPILING OF USEABLE OR WASTE MATERIALS FOR MORE THAN SEVEN (7) DAYS SHALL HAVE APPROPRIATEEROSION AND SEDIMENT CONTROL MEASURES INSTALLED. THE CONTRACTOR SHALL PROVIDE STOCKPILE MANAGEMENT PERBMPs AS DESCRIBED IN THE SCDOT WATER QUALITY PROTECTION DURING CONSTRUCTION FIELD MANUAL (JANUARY 2004)SECTION 8.6. ACTIVE STOCKPILES SHALL BE COVERED, STABILIZED OR PROTECTED WITH TEMPORARY LINEAR SEDIMENT BARRIERPRIOR TO THE ONSET OF PRECIPITATION.22.TEMPORARY STOCKPILES SHALL BE PLACED A MINIMUM OF 50 FEET AWAY FROM CONCENTRATED STORM WATER FLOWS,DRAINAGE COURSES, STORM WATER INLET STRUCTURES, ADJACENT PROPERTY, AND PUBLIC ROADWAYS. REPAIR AND/ORREPLACE PERIMETER CONTROLS AS NECESSARY. SEDIMENT SHALL BE REMOVED WHEN SEDIMENT ACCUMULATION REACHES 1/3OF THE BARRIER HEIGHT.23.THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF ANY SEDIMENT CONTROL DEVICES NEEDED ORREQUIRED AT BORROW OR HAUL AREAS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A GRADING AND/OR MININGPERMIT FOR OFFSITE BORROW PITS AND/OR STOCKPILE AREAS.24.SOLID WASTE DISPOSAL SHALL BE IN COMPLIANCE WITH SCDHEC SOLID WASTE REGULATIONS AND CITY OF SPARTANBURGNUISANCE ORDINANCE.25.THE CONTRACTOR SHALL ESTABLISH AN APPROPRIATE AREA ON SITE FOR TOPSOIL STORAGE. STOCKPILE SHALL BE STABILIZEDAND SILT FENCE SHALL BE INSTALLED TO PREVENT SEDIMENTATION. CONTRACTOR SHALL COORDINATE WITH LANDSCAPINGCONTRACTOR AND OWNER FOR DISTRIBUTION OF TOPSOIL ON SITE.26.ALL EXISTING OR NEW STORM WATER STRUCTURES SHALL BE CLEANED OF ANY ACCUMULATED CONSTRUCTION DEBRIS ORSEDIMENTS FROM THIS PROJECT SITE. DISPOSAL OF ALL RECOVERED SEDIMENTS AND CONSTRUCTION DEBRIS SHALL BE INACCORDANCE WITH ALL APPLICABLE CITY, STATE AND FEDERAL REGULATIONS.27.THE CONTRACTOR AND OWNER SHALL ALLOW CITY OF SPARTANBURG OR OTHER IMPLEMENTING AGENCY TO CONDUCT ONSITEINSPECTIONS.28.A MINIMUM 10' WIDE BUFFER SHALL BE MAINTAINED ALONG THE EDGES OF ALL WETLANDS DURING DEMOLITION ANDCONSTRUCTION ACTIVITY.29.TEMPORARY TOILETS, IF USED DURING CONSTRUCTION, SHALL NOT BE PLACED WITHIN 50' OF AN EXISTING OR PROPOSEDSTORMDRAIN INLET OR OUTLET.30.TEMPORARY CONCRETE TRUCK WASH OUT AREAS SHALL NOT BE PLACED WITHIN 50' OF AN EXISTING OR PROPOSED STORMDRAININLET.31.ANY GROUNDWATER ENCOUNTERED WHILE TRENCHING MUST BE FILTERED PRIOR TO DISCHARGE.
Know what's below.Call before you dig.
www.sitedesign-inc.com 1074 ASHEVILLE HWY SPARTANBURG, SC 29303 PH: (864)285-00618
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS
THE OSLO
SHEET INDEX
SHEET NUMBER1 OF19
ENCROACHMENT NOTES1.PRIOR TO CONSTRUCTION ALL EROSION CONTROL FEATURES SHALL BE INSTALLED PER THE SWPPP.2.CONTRACTOR SHALL FOLLOW ALL SCDOT APPROVED TRAFFIC CONTROL STANDARDS DURING CONSTRUCTION.3.EMERGENCY SERVICES (E911) SHALL BE NOTIFIED PRIOR TO ROAD CLOSURES AND/OR REROUTING.4.WHERE SIDEWALKS INTERSECT ROADS, HANDICAPPED RAMPS SHALL BE INSTALLED PER SCDOT AND CITY OFSPARTANBURG SPECIFICATIONS5.NEW SIDEWALK TO BE INSTALLED IN ACCORDANCE WITH SCDOT STD. DRAWING 720-6 AND 720-7.CONSTRUCTION SCHEDULE1CLEAR AND GRUB SITEDETERMINE LIMITS OF CONST.
BUILDING CONSTRUCTIONINSTALL CONSTRUCTION ENTRANCEGRADE SITE AREASINSTALL STORM DRAIN
MAINT. OF SED AND EROSIONREMOVE EROSION CONTROL MEASURES
MONTH
FINAL GRASSING AND LANDSCAPING
TASKS
CLOSEOUT PERMIT
23456789101112
PAVING OPERATIONS
C000 COVER SHEET......................................................................................................................................1OF19C100EXISTING CONDITIONS AND DEMOLITION.......................................................................................2OF19C200 SITE PLAN.............................................................................................................................................3OF19C250SITE DETAILS.......................................................................................................................................4OF19C251SITE DETAILS.......................................................................................................................................5OF19C300 SWPPP PHASE 1..................................................................................................................................6OF19C350SWPPP NOTES & DETAILS.................................................................................................................7OF19C351SWPPP NOTES & DETAILS.................................................................................................................8OF19C352SWPPP NOTES & DETAILS.................................................................................................................9OF19C400 GRADING PLAN....................................................................................................................................10OF19C410 WATER QUALITY DETAILS.................................................................................................................11OF19C450 STORMDRAIN DETAILS......................................................................................................................12OF19C451 STORMDRAIN DETAILS......................................................................................................................13OF19C500 UTILITY PLAN.......................................................................................................................................14OF19C501 FIRE PROTECTION PLAN....................................................................................................................15OF19C550 SPARTANBURG WATER STANDARD NOTES & DETAILS...............................................................16OF19C551 SPARTANBURG WATER STANDARD NOTES & DETAILS...............................................................17OF19L100 LANDSCAPING PLAN .........................................................................................................................18OF19L200 LANDSCAPING NOTES AND DETAILS...............................................................................................19OF19
AND PERIMETER BMP'S
24-HOUR CONTACTSTAN GENDLINSTAN@VANROCKRE.COM(864) 663-3777
STANDARD SCDHEC NOTES1.IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TOHYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THESLOPE IS BROUGHT TO GRADE.2.STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVETEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW.● WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS STABILIZATION MEASURES MUST BEINITIATED AS SOON AS PRACTICABLE.● WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE.3.ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATIONINDICATES THAT A BMP HAS BEEN INAPPROPRIATELY OR INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT ORMODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION.4.PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALLDISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, ANDTEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TOREMOVE SEDIMENT BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE.5.ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALLCONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTIONIN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION ISCOMPLETE AND THE SITE IS STABILIZED.6.THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THEGENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED.7.RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUALPROPERTY OWNERS SHALL FOLLOW THESE PLANS DURING CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN IN ACCORDANCE WITH S.C REG.72-300 ET SEQ. AND SCR100000.8.TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPERUNOFF AND/OR TO DIVERT SEDIMENT-LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS.9.ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILTFENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN’T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOTBUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOS.10.LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLYTREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORMWATER MUST BE PREVENTED FROM BECOMING A POLLUTANTSOURCE IN STORM WATER DISCHARGES.11.A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILYACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINALSTABILIZATION IS REACHED.12.INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND-DISTURBING ACTIVITIES HAVE PERMANENTLY ORTEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS.13.MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL.14.MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERSMUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE,15.MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGHAPPROPRIATE BMPS (SEDIMENT BASIN, FILTER BAG, ETC.).16.THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED:·WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL,·WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS,·FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE, AND·SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING.17.AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BECONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE.18.IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR SC’SWATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATIONBEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPS MUST BE IMPLEMENTEDAS SOON AS REASONABLY POSSIBLE.19.A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATIONOF CONSTRUCTION ACTIVITIES. FOR NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE THIS CONFERENCE MUST BE HELD ON-SITE UNLESS THEDEPARTMENT HAS APPROVED OTHERWISE
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
DEMOLITION NOTES1.DEMOLITION AND REMOVAL IS NOT NECESSARILY LIMITED TO THE ITEMS SHOWN ON THIS PLAN. CONTRACTOR SHALLREMOVE ADDITIONAL EXISTING UNSUITABLE MATERIAL OR STRUCTURES WITHIN THE CONSTRUCTION AREA ASNECESSARY.2.THE CONTRACTOR SHALL NOTIFY THE OWNER IMMEDIATELY IF UNDERGROUND STORAGE TANKS OR OTHEREQUIPMENT IS UNEARTHED OR OTHERWISE DISCOVERED.3.ALL EXISTING UTILITY DEMOLITION, REMOVAL, OR ABANDONMENT (WATER, SEWER, STORM DRAINAGE, ELECTRIC, GAS,TELEPHONE, CABLE, ETC.) SHALL BE DONE IN ACCORDANCE WITH THE STANDARDS, RULES, REGULATIONS, ANDREQUIREMENTS OF THE APPLICABLE GOVERNING UTILITY ENTITY. CONTRACTOR SHALL COORDINATE UTILITY WORKWITH THE APPROPRIATE UTILITY ENTITY. CONTRACTOR TO VERIFY USEFULNESS OF EXISTING SITE UTILITIES WITH THEAPPROPRIATE UTILITY ENTITY.4.THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM CITY OF SPARTANBURG NECESSARY OR REQUIRED TO PERFORMDEMOLITION. THE CONTRACTOR IS RESPONSIBLE FOR THE PROPER DISPOSAL OF DEMOLITION DEBRIS.5.THE CONTRACTOR SHALL CONDUCT ALL DEMOLITION, REMOVAL, STORAGE, CLEANUP, ETC. IN ACCORDANCE WITH ALLREGULATING AUTHORITIES INCLUDING BUT NOT LIMITED TO CITY OF SPARTANBURG, SCDHEC, AND THE U.S.ENVIRONMENTAL PROTECTION AGENCY.6.NO WORK MAY BE PERFORMED WITHIN THE STATE RIGHT-OF-WAY WITHOUT AN APPROVED SCDOT ENCROACHMENTPERMIT.7.EVERY ATTEMPT TO RECYCLE DEMOLISHED MATERIALS SHOULD BE MADE. COORDINATE WITH ON-SITECONSTRUCTION MATERIALS TESTING FIRM TO IDENTIFY ANY MATERIAL TO BE RECYCLED.11.ALL EXISTING DRIVEWAYS AND CURB CUTS THAT ARE NOT USED SHALL BE REMOVED AND REPLACED WITH ACONCRETE CURB, GUTTER, AD/OR SIDEWALK (IF EXISTING).12.SAWCUT EDGE OF ALL PAVEMENT TYPES WHERE CONNECTIONS ARE TO BE MADE. IF ASPHALT IS DAMAGED AT POINTOF CONNECTION, A PATCH WILL BE REQUIRED BY MILLING 2" DEPTH AT A MINIMUM WIDTH OF 6.5' FOR THE ENTIRELENGTH OF THE DAMAGED SECTION. IF ADJACENT SIDEWALK IS DAMAGED AT CONNECTION, THEN THAT SECTION WILLBE REMOVED AND REPLACED FROM JOINT TO JOINT.Know what's below.Call before you dig.
HATCHING DENOTESREMOVAL OF ON-SITEIMPERVIOUS AREASAWCUT EDGE OFPAVEMENT TOPROVIDE CLEAN JOINT
LIMITS OF DISTURBANCESHOWN AT 5' OFFSETFOR VISIBILITY (TYP.)
COORDINATE REMOVAL OF EXISTINGLIGHT AND POWER WITH PROVIDER
EXISTINGHYDRANT
BUILDING/PAVEMENT REMOVALREMOVAL LEGEND:COORDINATE REMOVAL OFEXISTING LIGHT AND POWERWITH PROVIDER
EXISTING CATCH BASINTO BE RETAINED
EXISTING CATCHBASIN TO BERETAINED
EXISTING CATCHBASIN TO BERETAINED
EXISTING CATCHBASIN TO BERETAINED
EXISTING CATCHBASIN TO BERETAINEDEXISTINGSEWER TOREMAINGEXISTINGSEWER TOREMAING
EXISTINGSEWER TOREMAING
± 36,600 S.F. OF PAVEMENT,SIDEWALK & CURB REMOVAL
± 7,350 S.F. OFBUILDINGDEMOLITION
ABANDONCATCH BASIN
ABANDONCATCH BASIN
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
Know what's below.Call before you dig.PARKING DATA:SINGLE-FAMILY - 2 SPACES* PER DWELLING UNIT (20 UNITS)TOTAL SPACES REQ'D:40SPACESSPACES PROVIDED:42SPACESUNITS 1-17 W/ (2) STALL GARAGESUNITS 18-20 W/ (1) STALL GARAGE & PARKING PADMAILBOX PARKING SHOWN W/ (2) PARKING SPACESADA SPACES PROVIDED:1SPACE
10' SIDE SETBACK
CITY OF SPARTANBURG NOTES:1.ALL EXISTING DRIVEWAYS AND CURB CUTS THAT ARE NOT USED SHALL BE REMOVEDAND REPLACED WITH A CONCRETE CURB, GUTTER, AND/OR SIDEWALK (IF EXISTING).2.ALL PLANTING AREAS SHALL BE MECHANICALLY IRRIGATED.3.THE DUMPSTER PAD AND SCREENING SHALL COMPLY WITH CITY STANDARDS ASFOUND IN SECTIONS 504.6 AND 505.63 OF THE CITY OF SPARTANBURG ZONINGORDINANCE.4.ALL HANDICAP SPACES WILL BE MARKED WITH A FREESTANDING OR WALL MOUNTEDSIGN. THE HANDICAP SIGN SHALL BE 7 FT. IN HEIGHT FROM THE BOTTOM OF THE SIGNOR ABOVE THE DRIVING SURFACE.5.ALL SIGNAGE SHALL COMPLY WITH THE CITY OF SPARTANBURG ZONING ORDINACE.6.PRIOR TO GRADING, THE ZONING ENFORCEMENT OFFICER WILL BE CONTACTED TOENSURE THAT ALL TREES MARKED FOR RETENTION IN THE LANDSCAPE PLAN AREPROPERLY IDENTIFIED AND FENCED OFF.7.ALL LANDSCAPE AREAS WILL BE DELINEATED BY CURBING.
SITE NOTES:1.THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES BYCALLING UTILITY LOCATION SERVICE AT 811 THREE (3) DAYS PRIOR TO CONSTRUCTION.2.DIMENSIONS SHOWN ARE TO EDGE OF PAVEMENT, CENTERLINE OF PARKING STALL ORFACE OF BUILDING UNLESS OTHERWISE NOTED.3.REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT BUILDING DIMENSIONS ANDENTRY/EXIT PORCHES.4.ASPHALT PAVING SECTIONS SHALL BE CONSTRUCTED PER THE DETAILS.5.CONCRETE SIDEWALKS SHALL BE CONSTRUCTED WITH 3000 PSI CONCRETE 4" THICK WITHEXPANSION JOINTS AND SCORING PER DETAIL.6.THE CONTRACTOR SHALL CONDUCT ALL WORK IN ACCORDANCE WITH THE LATESTREQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION.7.ALL WORK ON STATE, COUNTY, OR CITY RIGHT-OF-WAY INCLUDING DRIVEWAY APRONS,WATER AND SEWER TAPS OR ANY OTHER WORK REQUIRES AN ENCROACHMENT PERMITFROM THE APPROPRIATE AGENCY.8.ALL CURBING TO BE 18" FORMED CONCRETE CURBING PER DETAIL, WITH 3000 PSICONCRETE.9.ANY MATERIAL DEMOLISHED AS INDICATED ON THIS PLAN IS TO BE HAULED OFF-SITE TOAN APPROVED LANDFILL.10.TRUNCATED DOMES ARE TYPICAL AT ALL HANDICAP RAMPS. HANDICAP SPACES WILL BEMARKED WITH A FREESTANDING OR WALL MOUNTED SIGN. SEE DETAIL SHEETS FORPROPER STRIPING.11.ALL EXISTING DRIVEWAYS AND CURB CUTS THAT ARE NOT USED SHALL BE REMOVED ANDREPLACED WITH A CONCRETE CURB, GUTTER, AD/OR SIDEWALK (IF EXISTING).12.ALL SIGNS ON-SITE TO CONFORM WITH CITY OF SPARTANBURG ZONING ORDINANCE.
SITE DATA:PIN: 7-12-08-074.00TOTAL SITE = 1.291 AC (56,230 SF)ZONING - PDD R-6 (RESIDENTIAL)SETBACKS (OVERALL PROPERTY) -FRONT - 25'REAR - 10'SIDES - 10'SIDE ROAD - 15'SITE PLAN KEYED NOTES18" ROLLED CURB AND GUTTER (TYP.)CONCRETE PAVING (SEE DETAIL)UNIVERSAL ADA PARKING SPACE & ACCESS AISLES 1-1/2% (2%MAX) SLOPE IN ALL DIRECTIONS, ACCESSIBLE SIGNAGE &STRIPING, WHEEL STOP TYPICAL - SEE DETAILS4" PAINTED STRIPE (TYP.)ADA-COMPLIANT CONCRETE RAMP (TYP.)SUTERA UNDERGROUND TRASH CONTAINERSTOP SIGN W/ 24" PAINTED STOP BARDRIVEWAY APRON PER SCDOT STD. 720-410-00TRANSITION ROLLED CURB FLAT WITH SIDEWALKSITE WALL (DESIGN BY OTHERS)HEAVY DUTY ASPHALT PAVEMENT (SEE DETAIL)5' WIDE - 4" DEEP SIDEWALKCAST-IN-PLACE STAIRS W/ HANDRAILS (SEE DETAIL) (# OF STEPSTO BE FIELD DETERMINED BASED ON GRADING PLAN)STAIRS FROM MAIN FLOOR DOWN TO SIDEWALK (BUILDER TODETERMINE NECESSARY NUMBER OF STAIRS GIVEN SITEINFORMATION)
1234567891011121314 10' REAR SETBACK25' FRONTSETBACK
10' SIDE ROADSETBACK
25' FRONT SETBACK40.0'22.0'88.0'8.0'
5.0' 10' SIDE SETBACK10' SIDE SETBACK
2345
67
1
899
10
11
40.0'22.0'110.0'5.0'12
222
66.0'40.0'22.0'5.0'
110.0'40.0'22.0'5.0'
54.0'45.0'18.0'212
20.0'30.0'PRIVATER/W
20.0'30.0'PRIVATER/W9.0'20.0'
R15.0'R15.0'
R40.0'R60.0'
ZONING: LOD
ZONING: GID
ZONING: LOD
5.0'CONSTRUCTIONACCESSEASEMENT8.0'ACCESSEASEMENT
10.0'16.0'10.0'
14
14
13
13 OSLO DRIVE(30' PRIVATE R/W)
100101102103104200201202203303302301
405404403402401
110111112
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
TYPICAL HANDICAP SPACE W/RAMPSNO SCALE
6" 9'-0"9'-0"
CONCRETESIDEWALK (SEEDETAIL)
FACE OFSIDEWALK
FLUSH
1.5% CROSS SLOPE (2% MAX.) THROUGH ENTIRE ADA PARKING AREA
TAPER CURB TO BEFLUSH WITHPAVEMENT ANDSIDEWALK (TYPICAL ATBOTH SIDES OF HCPARKING)
5'SIDEWALKBOLLARD WITHHANDICAP SIGN(TYP.-SEEDETAIL)1% CROSS SLOPE (2% MAX.)THROUGH ENTIRE ADA PARKINGAREA
HC RAMP (7.5%SLOPE - TYP. BOTHSIDES OF ADAPARKING)6'-8"6'-8"5'-0" (MIN)SEE SITE PLAN
5' CROSSWALK -WHERE APPLICABLE(SEE SITE PLAN C200)
9'-0"
BOLLARD WITHHANDICAP SIGN(TYP.-SEEDETAIL)
NOT TO SCALE
(OR APPROVED EQUAL)SIGNS BY: GRIMCO, INC. ST. LOUIS, MO. 1-314-481-4404 1-800-542-994184" ABOVE PAVEMENT
RESERVEDPARKING(4 REQUIRED)12"x18""R7-8"18"MAXIMUMPENALTY"R7-8D"9"x12"(4 REQUIRED)$2009"CONDITION 260" ABOVE PAVEMENTCONDITION 1
CONDITION 1: PEDESTRIAN PATH DOES NOT PASS UNDER CONDITION 2: PEDESTRIAN PATH GOES BY, UNDER, OR OR AROUND SIGN. AROUND SIGN. (IE. PARKING LOT)
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
(755)
(753)(754)
(756)(757)(758)
(759)(759)
(759)
(735)
(740)(750)
(733)(734)
(736)(736)
(736)
(737)
(737)
(737)
(738)(739)(741)(751)
(755)
(755)
(753)(753)
(754)
(754)
(756)
(756)
(756)
(757)(757)
(757)
(757)
(758)(758)(758)(759)(759)
(767)(765)
(767)(765)(765)(767)(763)(761)(760)
(764)(762)(762)(764)(761)(763)(762)(760)(758)(760)
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
Know what's below.Call before you dig.
CONSTRUCTION SEQUENCE (SINGLE PHASE)1.OBTAIN PERMIT2.CALL FOR ON-SITE PRE-CONSTRUCTION MEETING BEFORE ANY SITE DISTURBANCECAN OCCUR.3.ATTEND ON-SITE PRE-CONSTRUCTION MEETING WITH CITY OF SPARTANBURG LANDDEVELOPMENT INSPECTOR4.DETERMINE AND MARK THE LIMITS OF CONSTRUCTION.5.INSTALL TEMPORARY STONE CONSTRUCTION ENTRANCE AT CURRENT ENTRANCELOCATION ON OAKWOOD AVENUE.6.CONTRACTOR SHALL INSTALL SILT FENCE AND OTHER INITIAL EROSION PREVENTION& SEDIMENT CONTROL (EPSC) MEASURES.7.COMPLETED ON-SITE DEMOLITION OF BUILDINGS, PAVEMENT, CURB, AND OTHERAREAS DETAILED ON THE DEMOLITION PLAN.8.GRADE ONLY AS NECESSARY TO INSTALL THE SEDIMENT TRAP. NOTE THATSEDIMENT TRAP WILL NOT CAPTURE RUNOFF FROM LOWER PORTION OF SITE. SILTFENCE REQUIRED ALONG WASHINGTON PLACE UNTIL STABILIZATION OF AREABELOW SEDIMENT TRAP IS COMPLETE.9.INSTALL TEMPORARY DIVERSIONS AS SHOWN ON PLAN. DIRECT DIVERSIONS TOSEDIMENT TRAP.10. IF ANY SOIL IS TO BE STOCKPILED, SILT FENCE MUST BE PLACED AROUNDPERIMETER.11.GRASS SEDIMENT TRAP PER THE GRASSING SPECIFICATION.12.INSPECT AND MAINTAIN ALL BMPS INSTALLED IN PHASE I OF SWPPP CONSTRUCTION.INSPECTIONS TO BE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS AFTER EACHRAINFALL EVENT THAT PRODUCES 1/2" OR MORE OF PRECIPITATION.13.MASS GRADE TO BRING THE SITE TO GRADE FOR THE ROADS, PARKING LOTS, ANDBUILDING PADS ENSURE SEDIMENT IS DIRECTED TO SEDIMENT TRAP14.AS SOON AS GRADES ALLOW, BEGIN INSTALLATION OF STORM DRAINAGE SYSTEM.PROVIDE INLET PROTECTION AT ALL INLETS.15.AS SOON AS GRADES ALLOW, BEGIN THE INSTALLATION OF THE WATER AND SEWER.CONTACT SPARTANBURG WATER PRIOR TO ANY WORK TO SCHEDULE A PRECON.16.ONCE SLOPES HAVE BEEN ESTABLISHED SEED WITH A PERMANENT SEED MIXTURE.ALL SLOPES 3:1 OR GREATER ARE TO RECEIVE EROSION CONTROL MATTING.17.IF ANY SOIL IS TO BE STOCKPILED, SILT FENCE MUST BE PLACED AROUNDPERIMETER.18.AS SOON AS FINAL GRADES ARE ACHIEVED IN THE PARKING LOT INSTALL CURB &GUTTER. AS SOON AS PRACTICAL PLACE THE FIRST COURSE OF PAVEMENT.19.ONCE THE STONE LAYER OF THE PAVEMENT STRUCTURE HAS BEGUN, REMOVESEDIMENT TRAP AND COMPLETE STONE STABILIZATION OF PARKING AREA.20.INSTALL SIDEWALKS AND LANDSCAPING AS SOON AS POSSIBLE.21.CALL FOR A FINAL PUNCH LIST WITH THE CITY INSPECTOR.22.COMPLETE ITEMS FROM PUNCH LIST.23.ENGINEER AS-BUILT CERTIFICATION FOR QUALITY FEATURES COMPLETED AND SENTTO CITY OF SPARTANBURG.24.ONCE SITE IS FINALLY STABILIZED PER CITY OF SPARTANBURG AND SCDHECREQUIREMENTS, PULL THE SILT FENCE AND ANY REMAINING BMP ITEMS.25.PROVIDED SITE CLOSEOUT PROCEDURES HAVE BEEN FOLLOWED AS INDICATED ONTHE PLANS AND FINAL STABILIZATION IS SATISFACTORY PER CITY OFSPARTANBURG AND SCDHEC REQUIREMENTS, REMOVE REMAINING PERIMETER SILTFENCE AND REQUEST NOTICE OF TERMINATION FROM DHEC.**SCDHEC STANDARDBMPs MUST REMAIN IN PLACE UNTIL THE SITE REACHES 70% STABILIZATION PERSQUARE YARD.
SWPPP CLOSEOUT PROCEDURES1.NO LATER THAN 30 DAYS BEFORE PROJECT COMPLETION, THE CONTRACTOR SHALL REQUEST ANINITIAL CLOSURE INSPECTION WITH THE OWNER, SCDHEC/LDD INSPECTOR, AND THE PLANENGINEER TO DEVELOP A CORRECTION LIST AND SPECIFICATION FOR FINDINGS NOT INACCORDANCE WITH THE APPROVED PLAN.2.UPON COMPLETION OF THE CORRECTIONS NOTED ABOVE, ENGINEER WILL SUBMIT AN"APPLICATION FOR PERMIT CLOSURE" TO CITY OF SPARTANBURG FOR ACCEPTANCE ANDAPPROVAL.A.PUNCHLIST OF CORRECTIONS MADE FROM INITIAL CLOSURE INSPECTION.B.LETTER OF CERTIFICATION THAT STORMWATER QUANTITY AND QUALITY MEASURES AREBUILT AND INSTALLED ACCORDING TO PLAN.C.CERTIFIED STORMATER AS-BUILT DRAWINGS PREPARED BY THE ENGINEER.D.COPY OF STORMWATER MANAGEMENT SYSTEM MAINTENANCE PLAN.E.STORMWATER MANAGEMENT SYSTEM OWNERSHIP AND CONTACT INFORMATION.F.NOTICE OF TERMINATION FORM.3.UPON ACCEPTANCE AND APPROVAL OF CLOSURE APPLICATION, SCHEDULE A FINAL SWPPPPERMIT CLOSE OUT INSPECTION WITH CITY OF SPARTANBURG INSPECTOR.4.FINAL SWPPP GRADING PERMIT INSPECTION MUST BE COMPLETED PRIOR TO REQUESTING ACERTIFICATE OF OCCUPANCY, RELEASE OF BOND, AND SUBMITTING A NOTICE OF TERMINATION(NOT) TO DHEC.
MAINTENANCE STATEMENTEROSION CONTROL MEASURES WILL BE MAINTAINED AT ALLTIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLANDOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL,ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURESSHALL BE IMPLEMENTED TO CONTROL OR TREAT THESEDIMENT SOURCE.TOTAL SITEDISTURBANCE:1.5 ACRESANY EXCESS SOIL HAULEDOFF-SITE MUST BE TO ANAPPROVED PERMITTEDSITE.DIVERSIONS TO BESEEDED IMMEDIATELYAFTER INSTALLATION
CONTRACTOR SHALL CLEARAND GRUB ONLY IN AREASREQUIRED FOR INSTALLATIONOF EROSION CONTROLMEASURES BEFORE ANY OTHERSITE DISTURBANCE
I have placed my signature and seal on the design documentssubmitted signifying that I accept responsibility for the designof the system. Further, I certify to the best of my knowledgeand belief that the design is consistent with the requirementsof Title 48, Chapter 14 of the Code of Laws of SC, 1976 asamended, pursuant to Regulation 72-300 et seq. (if applicable),and in accordance with the terms and conditions of SCR100000
CONSTRUCTIONENTRANCESEE DETAIL
TYPE 'B' INLETPROTECTION (TYP.)
BEGIN SINGLEROW SILT FENCE
TEMPORARYSTOCKPILE W/SILT FENCE
NPDES LIMITS OFDISTURBANCESHOWN AS A 5'OFFSET FOR CLARITY
24-HOUR CONTACTSTAN GENDLINSTAN@VANROCKRE.COM(864) 663-3777
±975 L.F. OF SINGLEROW SILT FENCE
END SINGLEROW SILT FENCE
BEGIN SINGLEROW SILT FENCE
±50 L.F. OF SINGLEROW SILT FENCE
END SINGLEROW SILTFENCE
CONCRETE WASHOUT &PORT-A-JOHN - IF CONTRACTORRELOCATES MARK UP ON THISPLAN NEW LOCATION
SEDIMENT TRAP TO BEINSTALLED ONCE BUILDINGDEMOLITION IS COMPLETE
STABILIZE BUILDING PADLOCATIONS WITH STONEONCE SUBGRADE IS REACHED
STONE INLET IN SILTFENCE TO ALLOWOFF-SITE WATER
±30 L.F. OF SINGLEROW SILT FENCE
SEDIMENT TRAP:BOT. ELEV.: 735.5'TOP ELEV.: 738.0TOTAL STORAGE: 2,200 C.F.RIPRAP WEIR: 2' HT.
52.0'26.0'
SEDIMENT TRAP TO HAVEDIMENSIONS NOT LESS THAN26' WIDTH X 52' LENGTH1
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
I have placed my signature and seal on the design documentssubmitted signifying that I accept responsibility for the designof the system. Further, I certify to the best of my knowledgeand belief that the design is consistent with the requirementsof Title 48, Chapter 14 of the Code of Laws of SC, 1976 asamended, pursuant to Regulation 72-300 et seq. (if applicable),and in accordance with the terms and conditions of SCR100000
South Carolina Department ofHealth and Environmental ControlType B
WIRE MESH INSTALLATIONDETAILPOST INSTALLATION DETAIL
STONE AND WIRE MESHINSTALLATION DETAILPLAN SYMBOL
DATE
FLAT-BOTTOM TRENCH DETAIL
V-SHAPED TRENCH DETAIL
SILT FENCE INSTALLATION
STANDARD DRAWING NO.South Carolina Department ofHealth and Environmental Control
PLAN SYMBOL
South Carolina Department ofHealth and Environmental ControlDATE
DESIGN NOTE1.TYPE B INLET PROTECTION TO BE USED DURING CONSTRUCTION OF CATCH BASINS PRIOR TOINSTALLATION OF GRATE TOPS.2.ONCE GRATE TOPS ARE INSTALLED CHANGE INLET PROTECTION TO DANDY SACKS (OR APPROVEDEQUAL).South Carolina Department ofHealth and Environmental ControlType BDATE
POROUS BAFFLESSouth Carolina Department ofHealth and Environmental Control
FLAT-BOTTOM TRENCH DETAIL
V-SHAPED TRENCH DETAIL
CROSS SECTION VIEW
PERSPECTIVE VIEWPLAN SYMBOL
POROUS BAFFLESSouth Carolina Department ofHealth and Environmental Control
12'3'7'2:12.5'16' 2'2:14'2,200 CF
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
South Carolina Department ofHealth and Environmental ControlPLAN SYMBOLSouth Carolina Department ofHealth and Environmental ControlCONSTRUCTION ENTRANCEDATE
South Carolina Department ofHealth and Environmental ControlTYPICAL DITCH CHECK SECTIONSPACING BETWEEN DITCH CHECK CROSS SECTION A-ATHRU STONE DITCH CHECK
PLAN SYMBOL
DATE South Carolina Department ofHealth and Environmental ControlDATE
South Carolina Department ofHealth and Environmental ControlType FPLAN SYMBOL
DATE
South Carolina Department ofHealth and Environmental ControlType FDATE
TEMPORARY STOCKPILESouth Carolina Department ofHealth and Environmental Control
TEMPORARY STOCKPILE AREA
South Carolina Department ofHealth and Environmental ControlTRACKINGSouth Carolina Department ofHealth and Environmental ControlCONCRETE WASHOUTDATE
CONCRETEWASHOUTCONCRETE WASHOUT SIGN DETAIL
PLANTYPE "ABOVE GRADE"WITH STRAW BALESSECTION B-B
STRAW BALE BARRIER CONCRETE WASHOUT
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
I have placed my signature and seal on the design documentssubmitted signifying that I accept responsibility for the designof the system. Further, I certify to the best of my knowledgeand belief that the design is consistent with the requirementsof Title 48, Chapter 14 of the Code of Laws of SC, 1976 asamended, pursuant to Regulation 72-300 et seq. (if applicable),and in accordance with the terms and conditions of SCR100000
(755)
(753)(754)
(756)(757)(758)
(759)(759)
(759)
(735)
(740)(750)
(733)(734)
(736)(736)
(736)
(737)
(737)
(737)
(738)(739)(741)(751)
(755)
(755)
(753)(753)
(754)
(754)
(756)
(756)
(756)
(757)(757)
(757)
(757)
(758)(758)(758)(759)(759)
(767)(765)
(767)(765)(765)(767)(763)(761)(760)
(764)(762)(762)(764)(761)(763)(762)(760)(758)(760)
FF ELEV:760.00
FF ELEV:758.67FF ELEV:760.00FF ELEV:760.00
FF ELEV:755.66
FF ELEV:757.00FF ELEV:756.33
FF ELEV:753.66
FF ELEV:759.75FF ELEV:759.75FF ELEV:759.75
FF ELEV:756.33FF ELEV:757.00
FF ELEV:754.33FF ELEV:755.00
FF ELEV:737.50FF ELEV:737.50FF ELEV:737.50
CB #1HW #1
CB #2HW #2
CB #3
HW #3SD MH #1EX. CB 4CB #4
EX. CB 2
EX. CB 3
EX. CB 5
757.11757.01
758.00757.95763.11763.18
752.65751.95
756.62
756.63
757.92759.40756.72756.32
756.99756.63
758.03757.75758.86758.60758.97759.01
759.02
747.67
FF ELEV:754.33
FF ELEV:753.67
STRUCTURE SCHEDULESTRUCTURECB #1CB #2CB #3CB #4SD MH #1RIM EL.758.63756.36752.07735.66737.17STORMDRAIN SCHEDULESTRUCTUREDOWNHW #1HW #2HW #3SD MH #1STRUCTUREUPCB #1CB #2CB #3CB #4LENGTH22'32'68'16'SLOPE1.00%10.00%3.75%1.00%SIZE15" RCP15" RCP15" RCP15" RCPIEDOWN756.25749.00745.00732.50IE UP756.47752.16747.55732.66
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
Know what's below.Call before you dig.
GRADING NOTES:1.THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES BYCALLING UTILITY LOCATION SERVICE AT 811 THREE (3) DAYS PRIOR TO CONSTRUCTION.2.THE CONTRACTOR SHALL NOTIFY THE ENGINEER FOR A REVIEW SHOULD ANYDISCREPANCIES BE DISCOVERED AT THE SITE OR ON THE DRAWINGS.3.PROOFROLLING AND COMPACTION TESTS SHALL BE ACCOMPLISHED IN THE FIELD TO TESTFILLED AREAS. INITIAL COMPACTION TESTS WILL BE CONDUCTED AT OWNER'S EXPENSE.RETESTING REQUIRED BECAUSE OF POOR COMPACTION SHALL BE CONDUCTED ATCONTRACTOR'S EXPENSE. CONTRACTOR SHALL SUPPLY RESULTS TO THE ENGINEERBEFORE ANY PRELIMINARY AND/OR FINAL APPROVALS.4.THE GRADING CONTRACTOR SHALL PROOFROLL THE CONSTRUCTION AREA WITH HEAVYRUBBER-TIRED EQUIPMENT. ALL SOFT SPOTS SHALL BE STABILIZED BY FURTHERCOMPACTIVE EFFORT OR UNDERCUT AND BACKFILLED WITH COMPACTED STRUCTURAL FILLMATERIAL.5.EARTHWORK SHALL BE TO THE GRADES AND LINES SHOWN. EXISTING AND PROPOSEDCONTOUR INTERVALS ARE AT 1'.6.ALL NEW ELEVATIONS SHOWN ARE FINISH ELEVATIONS. THE GRADING CONTRACTOR SHALLDEDUCT THE APPROPRIATE AMOUNT TO ESTABLISH SUBGRADE ELEVATION.7.WALL ELEVATIONS WHERE NOTED ARE TOP OF WALL AND FINISH GRADE AT BOTTOM OFWALL. SEE RETAINING WALL PLANS FOR DETAILED CONSTRUCTION INFORMATION.8.CONTRACTOR SHALL REMOVE TOPSOIL AS NECESSARY (MINIMUM OF 4") TO PROVIDEADEQUATE SUBGRADE FOR ROADWAYS.9.ALL EXCAVATION SHALL BE "UNCLASSIFIED EXCAVATION". ALL NEW FILL AND UTILITYTRENCH BACKFILL SHALL BE COMPACTED TO AT LEAST 95% OF MAXIMUM DRY DENSITY ASDETERMINED BY THE STANDARD PROCTOR (ASTM D-698). IN ADDITION, THE UPPER 18" OFALL FILL MATERIALS BENEATH FLOOR SLABS AND PAVEMENTS SHALL BE COMPACTED TOAT LEAST 98% OF THE MAXIMUM DRY DENSITY (ASTM D-698).10.THE CONTRACTOR SHALL CONDUCT ALL WORK IN ACCORDANCE WITH THE LATESTREQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION.11.ALL REINFORCED CONCRETE PIPE SHALL BE CLASS III, UNLESS OTHERWISE NOTED, ANDSHALL CONFORM TO SCDOT SPECIFICATIONS. ALL JOINTS SHALL BE TONGUE AND GROOVEWITH MASTIC MATERIAL.12.CATCH BASINS SHALL BE PRECAST R.EINFORCED CONCRETE DRAINAGE BOX WITH SOLIDWALL PER SCDOT STANDARD DRAWING 719-17A OR APPROVED EQUAL.13.ALL WORK ON STATE, COUNTY, OR CITY RIGHT-OF-WAYS, INCLUDING DRIVEWAY APRONS,WATER AND SEWER TAPS OR ANY OTHER WORK REQUIRES AN ENCROACHMENT PERMITFROM THE APPROPRIATE AGENCY.14.STANDING GRASS MUST BE EVIDENT IN AREAS THAT WERE SEEDED.15.AN AS-BUILT CERTIFICATION OF THE STORMWATER MANAGEMENT SYSTEM WILL BEREQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY FOR THE SITE. THEDESIGN ENGINEER WILL NOT BE RESPONSIBLE FOR THE DELAYS RESULTING FROMNON-COMPLIANCE WITH THE DESIGN DRAWINGS.16.CONTRACTOR TO CONFIRM ALL ELEVATIONS AND ADA COMPLIANCE PRIOR TO INSTALLINGCURB, SIDEWALK, OR PAVEMENT AND BRING ANY DISCREPANCIES TO THE ENGINEER'SATTENTION.
NOTES:1.SLOPES WITHIN ADA PARKING AREAS CANNOT EXCEED 2% IN ANY DIRECTION.ALL ADA PARKING AREAS ARE TO BE CONSTRUCTED WITH CONCRETE.2.SIDEWALK CROSS SLOPES ARE NOT TO EXCEED 2%.3.ANY SIDEWALK EXCEEDING 5% RUNNING SLOPE IS CONSIDERED A RAMP. ANYRAMP RISING GREATER THAN 6" MUST HAVE AN ADA APPROVED HANDRAIL ONBOTH SIDES. RAMPS MUST NOT EXCEED 8% RUNNING SLOPE.4.ANY EXCESS SOIL HAULED OFF-SITE MUST BE TO AN APPROVED PERMITTED SITE.5.SPOT ELEVATIONS SHOWN DENOTE BOTTOM OF CURB, TOP OF ASPHALT, ORGROUND SURFACE ELEVATION UNLESS OTHERWISE NOTED.6.TC = TOP OF CURB / BC = BOTTOM OF CURB.7.TW = TOP OF WALL / BW = BOTTOM OF WALL.8.BUILDING ROOF DRAINAGE WILL TIE TO UNDERGROUND STORMWATER DRAINAGESYSTEM. COORDINATE WITH MEP PLANS.
I have placed my signature and seal on the design documentssubmitted signifying that I accept responsibility for the designof the system. Further, I certify to the best of my knowledgeand belief that the design is consistent with the requirementsof Title 48, Chapter 14 of the Code of Laws of SC, 1976 asamended, pursuant to Regulation 72-300 et seq. (if applicable),and in accordance with the terms and conditions of SCR100000
GARAGES W/ 9'FRONT WALL
SITE DATA:PIN: 7-12-08-074.00TOTAL SITE = 1.291 AC (56,230 SF)ZONING - PDD R-6 (RESIDENTIAL)SETBACKS (OVERALL PROPERTY) -FRONT - 25'REAR - 10'SIDES - 10'SIDE ROAD - 15'
BARRACUDA S4(SEE DETIAL C410)
GARAGES W/ 9'FRONT WALL
RIPRAP PADFLUSH WITH EDGEOF SIDEWALK
RIPRAP PADFLUSH WITH EDGEOF SIDEWALK
PROPOSEDCONSTRUCTIONACCESS EASEMENT
PROPOSEDCONSTRUCTIONACCESS EASEMENT
ADJUST TOP OF EXISTINGTYPE 'C' OPENING TOACCOMMODATEDRIVEWAY APRONROOF LEADERFOR DOWNSPOUT(TYP.)
16" STEP
8" STEP8" STEP16" STEP8" STEP
8" STEP
8" STEP8" STEP
16" STEP
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
I have placed my signature and seal on the design documentssubmitted signifying that I accept responsibility for the designof the system. Further, I certify to the best of my knowledgeand belief that the design is consistent with the requirementsof Title 48, Chapter 14 of the Code of Laws of SC, 1976 asamended, pursuant to Regulation 72-300 et seq. (if applicable),and in accordance with the terms and conditions of SCR100000NO SCALE
ALL GRATE INLETS, STORM DRAIN,MANHOLE COVERS AND CATCHBASINS MUST BE CAST "DUMP NOWASTE, DRAINS TO STREAM" OREQUIVALENT
RIP RAP DIMENSIONSSTRUCTUREDo (FT)La (FT)W (FT)d50 (IN)HW #1HW #26HW #36
RIPRAP PLACEMENT AROUND HEADWALL AND PIPENO SCALE
PLACE RIPRAP AROUNDAND ABOVE END OFPIPE IN ADDITION TORIPRAP APRONPLACE RIPRAPAROUNDWINGWALLS INADDITION TORIPRAP APRONPRECASTCONCRETEHEADWALL
WEIR EL. (SEEPLAN SHEETS)
NOTES:1.INSTALL STEPS IN CATCHBASINS DEEPER THAN 3'. (COPOLYMER POLYPROPYLENE PLASTIC STEPS, REINFORCEDWITH 12" GRADE 60 STEEL REINFORCEMENT, 15" O.C.)2.WHEN CLASS "A" CONCRETE IS USED, WALLS AND FLOOR SHALL BE 6" THICK. FOR CONCRETE BRICK, THEWALLS SHALL BE 8" THICK AND FLOOR SHALL BE 6" THICK.3.BOX SIZE SHALL INCREASE WITH PIPE SIZE LARGER THAN 24".4.IF PLANS REFER TO SPECIFIC BOX SIZE, BOX SIZE IS MEASURED FROM INSIDE WALL TO INSIDE WALL.
MANHOLE LIDS ARE NOT ALLOWED INROW. SOLID TOP LIDS WITH INLETSARE TO BE USED WITHIN ROWN.T.S.5"
4'-0"
MIN.
#4 REBAR
2'-6"
KO4848 OR APPROVED EQUAL.MIN. OF TINDALL PRODUCTSLOPED @1" IN 12"GROUTED INVERT60 STEEL REINFORCEMENT, 15" O.C.STEPS, REINFORCED WITH 1/2" GRADECOPOLYMER POLYPROPYLENE PLASTIC
2"8"2"8"
MIN.6"MIN.6"PIPE DIA.VARIES
2"CL.3"CL.4" 4"8"8" # 4 AT 12" E.W.
DITCH BOTTOMSTOP OF BRICK TO MATCHEACH CORNER3 COURSE BRICK PIER4 # 5 E.W.
NEENAH R 6050INLET COVER & FRAME
TYPE C INLET SECTION
TOP
4'-8"2'-8" MIN.
4'-4"2'-8" MIN.
N.T.S.
WEIR EL. (SEEPLAN SHEETS)6"THROAT
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
I have placed my signature and seal on the design documentssubmitted signifying that I accept responsibility for the designof the system. Further, I certify to the best of my knowledgeand belief that the design is consistent with the requirementsof Title 48, Chapter 14 of the Code of Laws of SC, 1976 asamended, pursuant to Regulation 72-300 et seq. (if applicable),and in accordance with the terms and conditions of SCR100000
1" GROUTGRADE FOR HOOD
"B"
INVERT ELEV.OF OUTLET.OF CATCH BASINIS INVERT ELEV.FLOWROUNDED8" BRICK OR CONCRETE
NO SCALE
4"8"8""B"ENTRANCE#4 @ 12" EA. WAY
VARIES 9"
48"52"x52"PIPE30"36"TO 18"24"A x B44"x40"36"x36"24"x24"30"x30"
4"
8"4""A"4"8"
SSMH A1STA: 1+28.58RIM EL.: 758.96IE OUT: 755.89
EX. SSMH #1STA: 0+00.00RIM EL.: 758.74IE IN: 754.60
SSMH B1STA: 0+00.00RIM EL.: 751.93IE OUT: 741.34
EX. SSMH #2STA: 0+86.33RIM EL.: 745.34IE IN: 740.00
C - SEWER - A PROFILE
750755760765
750755760765
0+000+501+001+50
C - SEWER - B PROFILE
740745750755760
740745750755760
0+000+501+00
EX. SSMH #1STA:0+00.00RIM EL:758.74IE IN: 754.60129LF-6"DIP @ 1.00%
SSMH A1STA:1+28.58RIM EL:758.96IE OUT: 755.89
SSMH B1STA:0+00.00RIM EL:751.93IE OUT: 741.34
86LF-6"DIP @ 1.55%
EX. SSMH #2STA:0+86.33RIM EL:745.34IE IN: 740.00
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
Know what's below.Call before you dig.
CLEANOUT(TYP.)
EXISTINGHYDRANT
EXISTINGPOLE TOREMAIN
UTILITY NOTES:1.ALL UTILITIES LOCATED ON THIS PLAN SHOULD BE CONSIDERED APPROXIMATE.CONTRACTOR SHALL COORDINATE LOCATION OF UNDERGROUND UTILITIESWITH THE UTILITY LOCATING SERVICE, BY CALLING 811 THREE (3) DAYS PRIORTO CONSTRUCTION, AND UTILITY PROVIDERS.2.CONTRACTOR SHALL NOTIFY THE ENGINEER FOR A REVIEW SHOULD ANYDISCREPANCIES BE DISCOVERED AT THE SITE OR ON THE DRAWINGS.3.NEW UTILITY TRENCH BACKFILL SHALL BE COMPACTED TO AT LEAST 95% OFMAXIMUM DRY DENSITY AS DETERMINED BY THE STANDARD PROCTOR TEST(ASTM D-698). IN ADDITION, THE UPPER 18' OF ALL FILL MATERIALS BENEATHFLOOR SLABS AND PAVEMENTS SHALL BE COMPACTED TO AT LEAST 98% OFTHE MAXIMUM DRY DENSITY (ASTM D-698).4.CONTRACTOR SHALL CONSTRUCT DOMESTIC WATER SERVICE TO BUILDINGSSHOWN ON DRAWING. EXACT LINE SIZE, TYPE AND LOCATION TO BECOORDINATED WITH MEP PLANS AND THE GOVERNING UTILITY AUTHORITY.TAPS TO BE INSTALLED TO THE SPECIFICATIONS OF THE GOVERNING UTILITYAUTHORITY.5.CONTRACTOR SHALL CONSTRUCT SANITARY SEWER SERVICE TO BUILDINGS.EXACT SIZE, TYPE AND LOCATION TO BE COORDINATED WITH MEP PLANS ANDTHE GOVERNING UTILITY AUTHORITY. SERVICE TO BE INSTALLED TO THESPECIFICATIONS OF THE GOVERNING UTILITY AUTHORITY. INSTALL CLEANOUTS AT 75' INTERVALS (MAX) AND AT ALL DEFLECTIONS.6.CONTRACTOR SHALL COORDINATE ALL OTHER UTILITY CONNECTIONS WITHLOCAL PROVIDERS. CONTRACTOR SHALL INSTALL ALL UTILITIES TO THESPECIFICATIONS AND REQUIREMENTS OF THE ACCEPTING UTILITY AUTHORITY.7.THE CONTRACTOR SHALL CONDUCT ALL WORK IN ACCORDANCE WITH THELATEST REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTHADMINISTRATION.8.THE CONTRACTOR SHALL PROVIDE ALL NECESSARY UTILITY SCREENING TOMEET THE REQUIREMENTS OF THE CITY OF SPARTANBURG.9.OWN/ER/DEVELOPER TO CONTACT SPARTANBURG WATER NEW CONNECTIONSAT 864-583-7361 TO SETUP SMALL METER CONNECTION.10.OWNER/DEVELOPER TO CONTACT SPARTANBURG WATER NEW CONNECTIONSAT 864-583-7361 TO COORDINATE CONNECTION OF SEWER LATERAL
SITE DATA:PIN: 7-12-08-074.00TOTAL SITE = 1.291 AC (56,230 SF)ZONING - PDD R-6 (RESIDENTIAL)SETBACKS (OVERALL PROPERTY) -FRONT - 25'REAR - 10'SIDES - 10'SIDE ROAD - 15'
EXISTINGPOLE TOREMAIN
EXISTINGPOLE TOREMAIN
EXISTINGGASSERVICE
PROPOSED 8"x4"TAPPING SLEEVE& GATE VALVE
4" DIP WATERMAIN EXTENSION
BLOW OFF TAPAT END OFEXTENSION
HYDRANT 285 L.F. FROMFURTHEST BUILDING CORNER
30.0'COMBINEDWATERSEWERESMT.25.0'SSSDESMT.
10.2'
METER AND CONNECTIONTO BE COMPLETED BYSPARTANBURG WATER -COORDINATE W/ SWS NEWCONNECTIONS
DIAMOND SHAPE DENOTESLOT W/ WATER SERVICESTUB CONNECTION (TYP.)
STRUCTURE SCHEDULESTRUCTURECB #1CB #2CB #3CB #4SD MH #1
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
Know what's below.Call before you dig.
EXISTINGHYDRANT
SITE DATA:PIN: 7-12-08-074.00TOTAL SITE = 1.291 AC (56,230 SF)ZONING - PDD R-6 (RESIDENTIAL)SETBACKS (OVERALL PROPERTY) -FRONT - 25'REAR - 10'SIDES - 10'SIDE ROAD - 15'
R400.0'HYDRANTRADIUS
R400.0'HYDRANTRADIUS
EXISTINGHYDRANT
285'
80.3'291.4'
28.1'
168.8'
48.5'
256.1'
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
(755)
(753)
(754)
(756)
(757)(758)
(759)
(759)
(759)
(735)
(740)(750)
(733)(734)
(736)(736)
(736)
(737)
(737)
(737)
(738)(739)(741)(751)
(755)
(755)
(753)
(753)
(754)
(754)
(756)
(756)
(756)
(757)(757)
(757)
(757)
(758)
(758)(758)
(759)(759)
(767)(765)
(767)(765)
(765)(767)
(763)(761)(760)
(764)(762)(762)(764)
(761)(763)
(762)(760)
(758)(760)
x
xxxxxx
xxxxxxxxx
x
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
Know what's below.Call before you dig.
SITE DATA:PIN: 7-12-08-074.00TOTAL SITE = 1.291 AC (56,230 SF)ZONING - PDD R-6 (RESIDENTIAL)SETBACKS (OVERALL PROPERTY) -FRONT - 25'REAR - 10'SIDES - 10'SIDE ROAD - 15'
CITY OF SPARTANBURG LANDSCAPEREQUIREMENTSSTREET FRONTAGEREQ'D PER 100 LF(LESS DRIVEWAY)1 CANOPY TREE, 2 ORNAMENTAL TREES, 8EVERGREEN SHRUBSOAKWOOD AVE 120LF2 CANOPY, 3 ORNAMENTAL, 10 SHRUBSGARRETT ST 268 LF3 CANOPY, 6 ORNAMENTAL, 22 SHRUBSWASHINGTON PLACE 47 LF2 ORNAMENTAL, 4 SHRUBSALL LANDSCAPING SHALL BE MECHANICALLYIRRIGATEDCITY OF SPARTANBURG TREE PROTECTIONREQUIREMENTSTREES REMOVED38" OAK(2)19" BIRCH15" MAPLEREPLACEMENTS REQ'D8 - 2" CAL TREES
TREESCODEQTYBOTANICAL NAMECOMMON NAMESIZEARAG3Acer rubrum `Autumn Glory`Autumn Glory Maple2" CAL;12`-14` HTQUNU3Quercus nuttalliiNuttall Oak2" CAL;12`-14` HTQUPH2Quercus phellosWillow Oak2" CAL;12`-14` HT1`-4` EVERGREEN SHRUBCODEQTYBOTANICAL NAMECOMMON NAMESIZEDIVJ27Distylium x `Vintage Jade`Vintage Jade Distylium3 galICCA10Ilex cornuta `Carissa`Carissa Holly3 galLCJH4Loropetalum chinense rubrum 'Kurenai Daiou' TMJazz Hands Bold Loropetalum3 galORNAMENTAL TREECODEQTYBOTANICAL NAMECOMMON NAMESIZECCME4Cercis canadensis `Merlot`Merlot Redbud1 1/2" CAL; 8`-10` HTCFCP6Cornus florida `Cherokee Princess`Cherokee Princess Dogwood1 1/2" CAL; 8`-10` HT
PLANT SCHEDULExDENOTES TREES BEING REMOVED
(1) QUNU
(1) QUNU
(1) QUNU(1) QUPH
(1) QUPH
(2) CCME
(4) ICCA
(3) ICCA
(3) ICCA
(3) ARAG
(2) CCME
(1) LCJH(1) LCJH(1) LCJH
(1) LCJH
(3) DIVJ(3) DIVJ(3) DIVJ(3) DIVJ
(3) DIVJ
(3) DIVJ(3) DIVJ(3) DIVJ DENOTES TREEPROTECTION FENCINGFOR EXISTING MAPLE
LANDSCAPING NOTE:·ANY LANDSCAPING PROVIDED SHALL NOT INTERFERE WITH ANYSIGHT VISIBILITY AT ENTRANCE INTO SC HWY 11·ANY IRRIGATION INSTALLED FOR SITE SHALL NOT ENCROACH INTOSCDOT RIGHT OF WAY.
StateofSouthCarolina
ALISONG.BRANDTREGISTEREDLANDSCAPEARCHITECTNo. 552
TYPE:CANOPYCANOPYCANOPYSHRUBSHRUBSHRUB
UNDERSTORYUNDERSTORY
HORZ. SCALE:VERT. SCALE:DESIGNED BY:DRAWN BY:CHECKED BY:DATE:
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864)271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
3'PLAN VIEW OF ROOT ZONE
TREE PROTECTION FENCE
FOR PRUNING, SEENATIONAL ARBORISTASSOCIATION SPECS.
2x4" STANDARDS + 1x4" RAILS ORORANGE SAFETY FENCING MAY BE USED.
ONE FOOT FOR EACH INCH OF TRUNKDIAMETER OR 1/2 HEIGHT OF TREE WHICHEVERIS GREATER
NOTES:1. NO CONSTRUCTION ACTIVITY OR STORAGE SHALL BE LOCATED WITHIN THE PROTECTION AREA.2. REMOVE ALL BARRIERS UPON COMPLETION OF PROJECT.3. SEE PLANS FOR LOCATION AND REQUIRED RADIUS OF ALL TREE PROTECTION FENCES.4. DEAD TREES AND SCRUB OR UNDER GROWTH SHALL BE CUT FLUSH WITH ADJACENT GRADE. NOGRUBBING ALLOWED UNDER DRIP LINE.5. PLACE 4" LAYER OF MULCH AT AREAS NOT PROTECTED BY BARRIER.6. CONTRACTOR SHALL MAINTAIN TREE PROTECTION FENCE UNTIL FINAL CERTIFICATE OFOCCUPANCY. IF THE T.P. FENCE IS DAMAGED DURING CONSTRUCTION, IT WILL BE CONTRACTOR'SRESPONSIBILITY TO REPAIR AND NOTIFY L.A OF ANY POSSIBLE DAMAGE TO TREES.
TREE LIMB REMOVAL6' MINIMUM WIDTH FOR 2"CAL. TREES OR SMALLER3'
SAUCER SOIL TORETAIN WATER
DEEPROOT ARBORTIE-INSTALLED PERMANUFACTURERwww.deeproot.comPULL MULCH AWAY FROMCOLLAR OF TREE2 X 4" STAKEROOTBALLFINISHGRADE
BACKFILLMIXTURESUBGRADE
TREE OVER 2" CAL.
3" OR 4" MULCH
EARTH PEDESTAL TOKEEP TOP OF ROOT BALL2" ABOVE FINISH GRADE
REMOVE ALL WIRE AND ASMUCH BURLAP AS POSSIBLE
NOTES:1. REMOVE WIRE OR NYLON TWINE FROM ROOT BALL2. INSTALL TOP OF BALL 2" ABOVE FINISH GRADE3. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION4. 4" SAUCER WILL BE OUTSIDE OF BACKFILL.
AMENDED SOIL AREA:ENTIRE PLANTING AREA SHALL BE SCARIFIED AND CONTAIN AMENDED ON-SITESOIL OR A SOIL MIX TO A DEPTH OF 18" (IN SOME SITUATIONS, LAWN WILL BEPLANTED OVER THIS AREA)MULCH RING FOR TREES IN LAWN MINIMUM 6' DIA.
SHRUB PLANTING & V-DITCH BED EDGING
3-4""V-DITCH" EDGINGALL BEDLINESLAWN6-8"
COMPACTED SOIL MIXSCARIFY SIDES OF ROOT BALLSUBGRADE
4" SOIL SAUCER
NOTES:1. REMOVE WIRE, NYLON TWINE OR CONTAINER FROM ROOT BALL.2. SCARIFY SIDES AND BOTTOM OF HOLE AS WELL AS THE ROOT BALL.3. INSTALL TOP OF BALL 2" ABOVE FINISH GRADE4. ROOT BALLS GREATER THAN 2' IN DIAMETER SHALL SIT ON MOUND OF UNDISTURBEDSOIL TO PREVENT SETTLING.5. ROOT BALLS SMALLER THAN 2' MAY SIT ON COMPACTED SOIL MIXTURE.6. BACKFILL PIT WITH SPECIFIED PLANTING SOIL MIXTURE IN 8" LAYERS, HAND TAMP TOREMOVE VOIDS.7. WHEN 23 BACKFILLED, FILL WITH WATER8. AFTER BACKFILLING AND TAMPING FINAL LAYER, WATER AGAIN UNTIL NO MORE ISABSORBED.9. 4" SAUCER WILL BE OUTSIDE OF BACKFILL.
PREPARE AREA 3 TIMESWIDTH OF ROOTBALL
3" MULCH (SEE PLANTINGSCHEDULE FOR TYPE)
BACKFILL MIXTURE
GENERAL NOTES & SPECIFICATIONSLAWN INSTALLATION: Lawn areas shall be fine graded to a smooth, positively draining slope, removing all stones over 3/4" .Agricultural limestone shall be incorporated into the soil at a rate of 50 pounds per 1000 square feet. Apply specified seed atrecommended rate. Straw mulch or hydromulch shall be used as deemed necessary by the Landscape Contractor and LandscapeArchitect. The Landscape Contractor shall be responsible to establish a full stand of grass and will repair any bare spots 1'- 0"square due to uneven seed distribution, drought or erosion.SOD INSTALLATION: Sodded lawn areas shall be fine graded to a smooth, positively draining slope, removing all stones over 3/4" .Sod shall be healthy, thick sod placed so that joints are butt tight. Staple as necessary. Sod shall be trimmed to match bed linesshown on plan. Startup fertilizer shall be incorporated into the soil at the manufacturer's recommended rate. Any area of sod thatfails to root, settles or dies will be replace by the Landscape Contractor.UTILITY LOCATION: The Landscape Contractor is responsible for contacting the utility locator service and is responsible for anydamage done to utilities.QUANTITIES Plant quantities are shown for the contractor's convenience only.PLANTS SHALL BE INSTALLED AS SHOWN. Contractor is responsible for confirming all quantities prior to bidding and installation.BIDS In order to keep all bids standard, all bids are to have unit prices listed. The Owner has the option to delete any portion of thecontract prior to signing the contract or beginning work. This will be a unit price contract.PLANT QUALITY All plants shall be nursery grown, have a full habit of growth as is characteristic of that species, and shall be free ofdisease or insects. General plant quality shall be as specified in the "USA Standard for Nursery Stock" (published by the AmericanAssociation of Nurserymen). Please contact the Landscape Architect if there is difficulty in locating a particular plant. If necessary,a substitute plant will be recommended by the Landscape Architect.PLANTING AREA PREPARATION: Entire planting area shall be scarified and contain amended on-site soil or a soil mix to a depth ofno less than 18". (see planting detail for more information.)SETTING OF PLANTS The root ball of container grown plants shall be scarified in several places prior to planting. Plant shrubs andtrees so that after initial settlement, the top root balls will be even with or slightly above the adjacent soil line. Around root balls, 1/2of the original soil shall be removed from the planting hole and throughly mixed with the same quantity peat moss or well rotted, finetextured bark. (Only in areas where the existing soil is 100% fertile, loose topsoil (brown or black in color) can plants be placeddirectly in the soil with no amendments). PLANTINGS NOT DONE IN THIS MANNER SHALL BE REMOVED AND PROPERLYREPLANTED.PREPARATION OF GROUND COVER AND SEASONAL COLOR BEDS : The existing soil in ground cover and seasonal color bedsshall be thoroughly cultivated 6 inches deep, to a fine texture ( no clods over 1/2") with a mechanical tiller. A plant mix of 60%screened shredded topsoil, 20% sand, and 20% well rotted sawdust or peat shall then be thoroughly incorporated into the existingsoil with the tiller so that the soil mix (6" deep) is 1/2 original soil and 1/2 plant mix. All groundcover and seasonal color beds shallreceive a 2" layer of fine textured, screened, pine bark mulch, or equal.PLANTINGS NOT DONE IN THIS MANNER SHALL BE REMOVED AND PROPERLY REPLANTED.FERTILIZING Upon completion of plantings, all shrubs shall receive 1/6 cup of 16-4-8 fertilizer (50% of nitrogen slow release) evenlybroadcast at the base of the plants. Trees shall receive 1/4 cup of 16-4-8 fertilizer (50% of nitrogen slow release) per inch of caliper.Ground cover beds shall be fertilized at the rate of 20 pounds of 16-4-8 ( 50% of nitrogen slow release) per 1000 square feet.STAKING OF TREES Deciduous trees, 1 1/2" in caliper and over, and evergreen trees, 8' and taller shall be staked. Rubberhose to beused to cover the wire at the point of its contact with the tree. The Landscape Contractor is responsible for all wind damage to trees,(provided winds are less than 60mph) during the guarantee period, and may stake other trees (for his own protection) at his option.TRANSPLANTS All plant material to be transplanted shall be transplanted according to guidelines set by AAN standards.Transplanted material will not be guaranteed by the landscape contractor.MULCHING As specified on planting list. Hardwood mulch: All beds to receive a 3" layer of aged hardwood bark mulch (free of woodchips or large chunks of bark). Fresh hardwood bark mulch is not recommended to be used, as water run-off may cause staining onadjacent concrete surfaces. All damages incurred by the use of fresh hardwood mulch shall be the responsibility of the landscapecontractor. Pinestraw: All beds to receive a 4" layer (prior to compaction) of pinestraw. After natural compaction, pinestraw shouldhave a depth of 2". All trees located in lawn areas shall receive a 3' diameter ring of mulch. Mulch in these areas is to follow theabove listed guidelines. A weed barrier shall be provided in all bed areas under mulch layer.GRADING All final grading shall be the responsibility of the landscape contractor. The responsibility for any additional grading (ifneeded) shall be determined prior to bidding.BACKFILL Landscape contractor to verify any additional backfill/topsoil needed prior to beginning work. A unit price for topsoilshall be included in all bid documents to allow for circumstances that might arise during installation.STABILIZATION Landscape contractor shall ensure that all plantings are stabilized with ground covers, mulches or other approvedmaterials to prevent soil erosion and allow rainwater infiltration.CLEAN UP Final clean up of any disturbances occurring as a result of landscape operations shall be the responsibility of thelandscape contractor.INSPECTION It shall be the contractor's responsibility to provide for inspection of the plant material by the Landscape Architectprior to installation. All plant material will be inspected. Plants not conforming precisely to the plant list will not be accepted andshall be replaced at the contractor's own expense.LICENSES The contractor will be responsible for obtaining all licenses necessary to complete the work.INSURANCE With the submittal of bid documents, the landscape contractor shall also submit a certificate of insurance forworkman's compensation and a contractor's general liability. Contractors not providing evidence of such insurance will be ineligibleto recieve the contract for the jobGUARANTEE All plant material and workmanship to be guaranteed for one year from the date of acceptance by the Owner. Plantreplacement to occur only once. The contractor will not be responsible for defects resulting from neglect by the Owner, abuse ordamage by others, or unusual phenomena or incidents beyond the landscape contractors control which result from natural causessuch as floods, lightning, storms, freezing rains, or winds over 60 miles per hour, fire, vandalism or theft.IRRIGATION Unless otherwise specified, if an automatic irrigation system is desired or required, it will be the responsibility of thecontractor to have the system designed and installed.
StateofSouthCarolina
ALISONG.BRANDTREGISTEREDLANDSCAPEARCHITECTNo. 552