County Council Meeting — Agenda Packet
Beaufort County · Beaufort County · County Council Meeting · meeting of Nov 9, 2026 · Agenda packets
Open the original document More from Beaufort County
This document is no longer listed on Beaufort County's website. We kept the copy we read.
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
County Council Meeting
Beaufort County, SC
Council Chambers, Administration Building
Beaufort County Government Robert Smalls Complex
100 Ribaut Road, Beaufort
Monday, November 9, 2026
6:00 PM
AGENDA
COUNCIL MEMBERS:
Alice Howard, Chair
David P. Bartholomew
Logan Cunningham
York Glover
Lawrence McElynn
Thomas Reitz
Anna Maria Tabernik, Vice-Chair
Paula Brown
Gerald Dawson
Mark Lawson
Joseph Passiment
1. CALL TO ORDER: Alice Howard, Chair
2. PLEDGE OF ALLEGIANCE AND INVOCATION: Lawrence McElynn, Council Member
3. STATEMENT OF COMPLIANCE WITH FOIA: Alice Howard, Chair
4. APPROVAL OF AGENDA
5. APPROVAL OF MINUTES
a. Minutes from County Council October 12, 2026
6. PROCLAMATION
a. Proclamation recognizing Operation Green Light
7. ADMINISTRATOR'S REPORT
8. PUBLIC COMMENT PERIOD - 30 MINUTES TOTAL
9. LIAISON AND COMMITTEE REPORTS
● Community Services Committee
● Natural Resources Committee
● Finance, Administration, and Economic Development Committee
● Public Facilities Committee
10. APPROVAL OF CONSENT AGENDA
Page 1 of 430
CONSENT AGENDA
a. Items Originating from the Finance, Administration, and Economic Development Committee
1. Designation of December 23, 2026, as an additional paid holiday for County Employees.
2. Authorize the County Administrator to implement an FY27 Personal Leave Time (PLT)
Buyback for employees.
b. Items Originating from the Public Facilities and Safety Committee
1. Approval of a Contract to O'Quinn Marine Construction for Broad River Boat Landing floating
dock replacement ($217,500)
2. Approval of a Contract to Nix Construction for the construction of the Bailey Memorial Park
Project ($1,982,400.00).
3. Approval of a contract award to Nix Construction Inc. for the design and build of a Pedestrian
Walkway and Bridge Project at the Hilton Head Island Airport ($243,000.00)
4. Approval of Change Orders 1 and 2 for Beaufort Executive Airport Hangar Construction
Project - Site Development ($288,393.61)
5. Approval of Task Order to McSweeney Design for the Melrose Ferry Dock Replacement
Design ($946,962.50)
6. Approval of change order to Parrish & Partners for the Burnt Church Pathway ($63,936)
END OF CONSENT AGENDA
11. AGENDA ITEMS
a. Appointment of Sam Akers to the Lowcountry Workforce Development Board, as a representative
of the Higher Education Sector for a partial appointment with an expiration date of June 2029.
b. Recommend approval to fund due diligence and negotiate terms of acquisition for the Green Space
Program application: RLC Properties Tract.
12. ORDINANCES FOR THIRD READING:
a. 2026/50: An Ordinance to amend Beaufort County's Budget Ordinance for Fiscal Year 2027
(Ordinance No. 2026/29) to amend Section III, County Operations Revenues, and Section IV,
County Operations Appropriations to appropriate Fund Balance for Beaufort County Regions
Tournament Complex.
The vote at Finance, Administration, and Economic Development Committee on September 21,
2026 - Failed 5:5
The vote at First Reading on October 12, 2026 - 7:4
The vote at Second Reading and Public Hearing on October 26, 2026 - 9:2
13. ORDINANCES FOR SECOND READING:
a. 2026/54: An Ordinance authorizing the execution and delivery of an agreement governing a new
multi-county park by and between Beaufort County, South Carolina and Jasper County, South
Carolina; authorizing the inclusion of certain property located in Beaufort County in the multi-county
park; providing for the distribution of multi-county park revenues; authorizing the execution of an
intergovernmental agreement with the town of Port Royal; amending a prior master park agreement
to remove certain property located within the corporate limits of the town of Port Royal; and other
Page 2 of 430
related matters. (PUBLIC HEARING)
The vote at Finance, Administration, and Economic Development Committee, on October 19, 2026
- 6:3
The vote at First Reading on October 26, 2026 - 8:2:1
b. 2026/51: An Ordinance amending the Community Development Code (CDC): Table A.13.40 (May
River Community Preservation District Land Use) to permit cemeteries as an allowed use. (PUBLIC
HEARING)
The vote at Natural Resources Committee on October 5, 2026 - 4:0.
The vote at First Reading on October 26, 2026 - 6:5
c. 2026/52: An Ordinance to reallocate remaining American Rescue Plan Act (ARPA) funds in the
amount of $1,646,081.17 towards existing projects as obligated to the Department of
Treasury. (PUBLIC HEARING)
The vote at Finance, Administration, Economic Development Committee on October 19, 2026 - 7:2
The vote at First Reading on October 26, 2026 - 8:3
d. 2026/53:An Ordinance amending chapter 2, Article IV of the Code of ordinances of Beaufort
County, South Carolina, to define the reporting structure, duties, and mandatory legal reporting
requirements of the county staff attorney to the Beaufort County Council; and providing for
severability and an effective date (PUBLIC HEARING)
The vote at First Reading on October 26, 2026 - 8:3
14. ORDINANCES FOR FIRST READING:
a. 2026/55: An Ordinance authorizing Beaufort County Council to declare a temporary moratorium on
the acceptance, processing, approval, or issuance of certain applications, permits, and approvals
for data centers in Beaufort County, South Carolina; providing for a comprehensive study of the
potential cumulative impacts of data centers; invoking the pending ordinance doctrine; and
providing for other matters related thereto. (PUBLIC HEARING)
The vote at Natural Resources on November 2, 2026 -
b. 2026/56: An Ordinance amending the zoning map for 502 acres located on Dulamo Road and St.
Helenville Road (R300 007 000 0002 0000; R300 012 000 0256 0000) for the removal from the
Cultural Protection Overlay (CPO) district. (PUBLIC HEARING)
The vote at Natural Resources on November 2, 2026 -
c. 2026/57: An Ordinance to Amend Ordinance 2026/16 authorizing the County Administrator to
execute the necessary documents to convey a parcel of real property TMS No. R100 033 00A
021B 000 to the Habitat for Humanity of the Lowcountry for development of workforce/affordable
housing and other matters related thereto.
The vote at Natural Resources on November 2, 2026 -
d. 2026/58: An Ordinance recommending approval of the 2% State Accommodations Awards as
presented by the State Atax Committee.
The vote at Finance, Administration, and Economic Development Committee on October 19, 2026 -
9:0
e. 2026/59: An Ordinance Amending the FY2027 Budget for Carryover Purchase Orders for Parks
Page 3 of 430
and Recreation Impact fees for BRACE project.
The vote at Finance, Administration, and Economic Development Committee on October 19, 2026 -
9:0
f. 2026/60: An Ordinance to Repeal, Replace and Add Additional Policies to the Beaufort County
Code of Ordinances Chapter 2, Article VII, Division 4 (Beaufort County Purchasing Ordinance).
The vote at Finance, Administration, and Economic Development Committee on October 19, 2026 -
9:0
15. RESOLUTIONS:
a. 2026/46: A Resolution to amend Chapter 5, Section A, of the Rules of County Council to establish a
thirty-minute maximum duration for public hearings and clarify speaker time limits and zoning
presentation provisions.
The vote at Finance, Administration, and Economic Development Committee on October 19, 2026 -
7:1
The vote at County Council on October 26, 2026 to postpone until the November 9, 2026 County
Council meeting - 11:0
b. 2026/47: Resolution to create a Fire Service Study Ad Hoc Committee.
c. 2026/48: A Resolution for a Memorandum of Agreement (MOA) with the Town of Bluffton for the
Construction of Holly Hill Road.
The vote at Public Facilities Committee on October 19, 2026 - 10:0
d. 2026/49: A Resolution to Approve Recommendations to Award FY27 Community Services Grant
Program Funds in the Amount of $398,000 to Community Services Organizations.
The vote at Finance, Administration, and Economic Development Committee on October 19, 2026 -
5:3
e. 2026/50: A Resolution authorizing the County Administrator to pursue condemnation for a portion of
a parcel as specified on EXHIBIT “A” associated with right of way acquisition for Lady’s Island
Middle School Access Road as part of the 2018 One Cent Referendum.
The vote at Public Facilities Committee on October 19, 2026 - 9:1
f. 2026/51: A Resolution requesting amendments and clarifications to South Carolina Senate Bill 125
(S125) relating to property tax exemptions as an incentive for providing affordable housing.
16. ADJOURNMENT
To watch committee or County Council meetings or for a complete list of agendas and backup packages,
please visit: https://beaufortcountysc.gov/council/council-committee-meetings/index.html
Page 4 of 430
County Council Meeting
Beaufort County, SC
Council Chambers, Administration Building
Beaufort County Government Robert Smalls Complex
100 Ribaut Road, Beaufort
Monday, October 12, 2026
6:00 PM
MINUTES
Watch the video stream available on the County's website to hear the Council’s discussion of a specific topic or
the complete meeting https://beaufortcountysc.new.swagit.com/videos/403601
1. Call to Order
Chair Howard called the meeting to order at 6:32 PM
Present
Chair Alice Howard
Vice-Chair Anna Maria Tabernik
Council Member David Bartholomew
Council Member Paula Brown
Council Member Logan Cunningham
Council Member Gerald Dawson
Council Member York Glover
Council Member Mark Lawson
Council Member Lawrence McElynn
Council Member Joseph Passiment
Council Member Thomas Reitz - Virtual
2. Pledge of Allegiance and Invocation
Council Member Dawson led the Pledge of Allegiance and gave the invocation.
3. Statement of Compliance with FOIA
Chair Howard stated that public notification of this meeting had been published, posted, and distributed
in compliance with SC FOIA.
4. Approval of Agenda
Motion: It was moved by Council Member McElynn, seconded by Council Member Bartholomew to
approve the agenda.
Motion to Amend: It was moved by Council Member McElynn, seconded by Council Member
Cunningham to amend the agenda to add two discussion items at the end. The first would be a timeline
and action plan regarding the proposed Ordinance changing the reporting structure of the County
Attorney's office to report to County Council. The second item is an action plan and timeline with regard
Page 5 of 430
to the results of the Quick Group report.
The Vote - Voting Yea: Council Member Bartholomew, Council Member Cunningham, Council Member
Glover, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council
Member Reitz.
Voting Nay: Chair Howard, Vice-Chair Tabernik, Council Member Brown, and Council Member Dawson.
The motion to amend passed 7:4.
Main Motion: It was moved by Council Member McElynn, seconded by Council Member Bartholomew
to approve the agenda as amended.
The Vote - Voting Yea: Council Member Bartholomew, Council Member Cunningham, Council Member
Glover, Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council
Member Reitz.
Voting Nay: Chair Howard, Vice-Chair Howard, Council Member Brown, and Council Member Dawson.
The amended motion failed 7:4.
Main Motion: It was moved by Council Member McElynn, seconded by Vice-Chair Tabernik to approve
the published agenda.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Brown, Council Member
Dawson, Council Member Glover, Council Member Lawson, and Council Member Reitz.
Voting Nay: Council Member Bartholomew, Council Member Cunningham, Council Member McElynn,
and Council Member Passiment. The main motion passed 7:4.
5. Approval of Minutes
Motion: It was moved by Council Member Lawson, seconded by Council Member Glover to approve the
minutes from Caucus and County Council September 14, 2026.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Glover,
Council Member Lawson, Council Member Passiment, and Council Member Reitz.
Voting Nay: Council Member McElynn. The motion passed 10:1.
6. Proclamation
a. Proclamation recognizing the Week of October 18–24 as National Friends of Libraries Week.
Council Member Passiment presented representatives from the Friends of the Beaufort County
Libraries a proclamation recognizing the Week of October 18-24 as National Friends of the Libraries
Week.
b. Proclamation recognizing Kraig Gordon.
Chair Howard presented a proclamation to Kraig Gordon recognizing his tenor on the Beaufort County
Transportation Committee.
7. Administrator’s Report
Michael Moore, County Administrator, recognized employees with longevity awards. Mr. Moore
introduced Justin Jarrett, Broadcasting Director, and Martin Stevens, Chief Information Officer. Mr.
Page 6 of 430
Moore recognized the Beaufort County Transportation Committee with their award from SCDOT. Mr.
Moore provided an update on the Sales Tax Referendum and Alljoy Pathway. Please watch the video
stream on the county's website to view the full report.
https://beaufortcountysc.new.swagit.com/videos/403601
8. Public Comment Period
Public comments were taken. Please watch the video stream on the county's website to view the full
comment period. https://beaufortcountysc.new.swagit.com/videos/403601
9. Liaison and Committee Reports
Council Members provided updated on the various boards and commissions of Beaufort County.
Please watch the video stream on the county's website to view the full report.
https://beaufortcountysc.new.swagit.com/videos/403601
10. Approval of Consent Agenda
Motion: It was moved by Council Member Passiment, seconded by Council Member Lawson to approve
the consent agenda.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Glover,
Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member
Reitz. The motion passed 11:0.
CONSENT AGENDA
a. Items Originating from the Public Facilities and Safety Committee
1. Approval of task order to Collins Engineers, Inc for the design of improvements and
expansion of the Eddings Point Boat Landing ($233,912.80) (Pending A&H Tax awards on
9/14/26)
2. Approval of a change order to MAJ Enterprises, Inc. for the Shell Point Traffic Calming
Project ($53,592.09)
3. Recommendation to Award a contract to Apac Atlantic, Inc for the Sunset Blvd / Miller Drive
roadway resurfacing and traffic calming project ($739,873.48)
4. Approval of a Task Order to HDR Engineering, Inc for the Preliminary Engineering for
Alterations to the Chowan Creek Bridge Approaches ($212,630)
5. Omnia contract award for St. Helena Island Library LED retrofit ($200,000).
6. Recommendation for approval of a change order with Kimley Horn for a Phase 2
Environmental Site Assessment (ESA) on the Ladys Island Drive Turn Lane at Ribaut Road
Project ($42,350)
END OF CONSENT AGENDA
11. Ordinances for Third Reading
a. 2026/43: An ordinance to amend Ordinance 2026/29 to authorize the transfer of funds.
The vote at the Finance, Administration, and Economic Development Committee on August 17,
2026 - 9:0
The vote at First Reading on September 14, 2026 - 9:1
The vote at Second Reading and Public Hearing September 28, 2026 - 6:4
Page 7 of 430
Motion: It was moved by Council Member Passiment, seconded by Council Member Lawson to approve
Third Reading of Beaufort County Ordinance 2026/43.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Brown, Council Member
Dawson, Council Member Glover, Council Member Lawson, Council Member McElynn, and Council
Member Passiment.
Voting Nay: Council Member Bartholomew, Council Member Cunningham, and Council Member Reitz.
The motion passed 8:3
b. 2026/44: An Ordinance Amending the FY2027 Budget for Stormwater Utility Operations, Carryover
Purchase Orders, Accommodations & Hospitality Tax projects, and Facility Operations.
The vote at Finance, Administration, and Economic Development Committee Meeting on August
17, 2026 - 9:0
The vote at First Reading on September 14, 2026 - 10:0
The vote at Second Reading and Public Hearing on September 28, 2026 - 10:0
Motion: It was moved by Council Member Brown, seconded by Council Member Passiment to approve
Third Reading of Beaufort County Ordinance 2026/44.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Glover,
Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member
Reitz. The motion passed 11:0.
c. 2026/45: An Ordinance Authorizing the County Administrator to Execute the Necessary
Documents and Provide Funding for the Purchase of Real Property Identified as TMS Nos. R200-
010-000-0340-0000, R200-010-000-021G-0000, and R200-010-000-0446-0000 from Brickyard
Commons, LLC for the Royal Pines Stormwater Project in the amount of $3,475,000.
The vote at the Finance, Administration, and Economic Development Committee meeting on
August 17, 2026 - 9:0
The vote at First Reading on September 14, 2026 - 10:0
The vote at Second Reading and Public Hearing on September 28, 2026 - 10:0
Motion: It was moved by Council Member Bartholomew, seconded by Council Member Cunningham to
approve Third Reading of Beaufort County Ordinance 2026/45.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Glover,
Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member
Reitz. The motion passed 11:0.
d. 2026/46: An Ordinance Authorizing the County Administrator or negotiating authority in
accordance with Resolutions 2019/44 and 2021/20 to execute any and all necessary documents
for the acceptance of Right of Way and/or Temporary Construction Easement properties as shown
on EXHIBIT A Pages 1-4 associated with the Sidewalks and Multi-use Pathways – Safe Routes to
Schools and EXHIBIT A Pages 5-8 associated with the Lady’s Island Corridor Traffic
Improvements.
The vote at the Public Facilities Committee Meeting on August 17, 2026 - 9:0
The vote at First Reading on September 14, 2026 - 10:0
The vote at Second Reading and Public Hearing on September 28, 2026 - 10:0
Motion: It was moved by Chair Howard, seconded by Council Member Brown to approve Third Reading
of Beaufort County Ordinance 2026/46.
Page 8 of 430
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Glover,
Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member
Reitz. The motion passed 11:0.
12. Ordinances for Second Reading
a. 2026/47: An Ordinance authorizing the County Administrator to execute an Electric Line Easement
with Dominion Energy on the property known as Pocotaligo Preserve (TMS R710 012 000 0001
0000 and R710 012 000 0072 0000).
The vote at Natural Resources Committee on September 8, 2026 - 7:0
The vote at First Reading on September 28, 2026 - 10:0
Motion: It was moved by Council Member Passiment, seconded by Council Member Glover to approve
Second Reading of Beaufort County Ordinance 2026/47.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Glover,
Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member
Reitz. The motion passed 11:0.
b. 2026/48: An Ordinance amending the Beaufort County Code of Ordinances, Chapter74 - Building
and Building Regulations, Section 74-64, Adoption of Building Codes (Amends Code of
Ordinances to adopt the 2024 State Mandated Code Editions).
The vote at Natural Resources Committee on September 8, 2026 - 7:0
The vote at First Reading on September 28, 2026 - 10:0
Motion: It was moved by Council Member Passiment, seconded by Council Member Glover to approve
Second Reading of Beaufort County Ordinance 2026/48.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Dawson, Council Member Glover,
Council Member Lawson, Council Member McElynn, Council Member Passiment, and Council Member
Reitz. The motion passed 11:0.
13. Ordinances for First Reading
a. 2026/49: An Ordinance authorizing the private road acceptance of Bellinger Bluff Road and
Bellinger Neck Road into the County Road Inventory.
The vote at Public Facilities Committee on September 21, 2026 - Failed 3:7
Motion: It was moved by Council Member Passiment, seconded by Council Member Glover to approve
First Reading of Beaufort County Ordinance 2026/49.
The Vote - Voting Yea: Council Member Bartholomew, and Council Member Glover.
Voting Nay: Chair Howard, Vice-Chair Tabernik, Council Member Brown, Council Member
Cunningham, Council Member Dawson, Council Member Lawson, Council Member McElynn, Council
Member Passiment, and Council Member Reitz. The motion failed 2:9.
b. 2026/50: An Ordinance to amend Beaufort County's Budget Ordinance for Fiscal Year 2027
(Ordinance No. 2026/29) to amend Section III, County Operations Revenues, and Section IV,
County Operations Appropriations to appropriate Fund Balance for Beaufort County Regions
Page 9 of 430
Tournament Complex.
The vote at Finance, Administration, and Economic Development Committee on September 21,
2026 - Failed 5:5
Motion: It was moved by Council Member Cunningham, seconded by Council Member Bartholomew to
approve First Reading of Beaufort County Ordinance 2026/50.
The Vote - Voting Yea: Chair Howard, Vice-Chair Tabernik, Council Member Bartholomew, Council
Member Brown, Council Member Cunningham, Council Member Lawson, and Council Member Reitz.
Voting Nay: Council Member Dawson, Council Member Glover, Council Member McElynn, and Council
Member Passiment. The motion passed 7:4.
14. Adjournment
Motion: It was moved by Council Member Bartholomew, seconded by Council Member Cunningham to
release the Quick Group findings immediately.
The Vote - Voting Yea: Vice-Chair Tabernik, Council Member Bartholomew, Council Member
Cunningham, Council Member Passiment, and Council Member Reitz.
Voting Nay: Chair Howard, Council Member Brown, Council Member Dawson, Council Member Glover,
Council Member Lawson, and Council Member McElynn. The motion failed 5:6.
COUNTY COUNCIL OF BEAUFORT COUNTY
BY: _________________________________________
Alice G. Howard, Chairman
ATTEST:
______________________________________
Sarah W. Brock, Clerk to Council
Ratified:
Page 10 of 430
Whereas, Beaufort County Council has great respect, admiration, and the utmost
gratitude for all the men and women who have selflessly served our country and this community
in the Armed Forces; and
Whereas, Beaufort County Council seeks to honor individuals who have made countless
sacrifices for freedom by placing themselves in harm’s way for the good of all; and
Whereas, veterans continue to serve our community in the American Legion, Veterans
of Foreign Wars, religious groups, civil service, and by functioning as County Veterans Services
Officers in 29 states to help fellow former service members access more than $52 billion in federal
health, disability, and compensation benefits each year; and
Whereas, approximately 200,000 service members transition to civilian communities
annually; and
Whereas, studies show that 44 to 72 percent of service members experience significant
stress during their transition from military to civilian life, and those transitioning from active duty
are at an increased risk of suicide during their first year following military service; and
Whereas, the National Association of Counties encourages all counties, parishes, and
boroughs to recognize Operation Green Light for Veterans.
Now,
therefore
be
it
resolved,
that
Beaufort
County
Council
hereby
designates
the
month
of
November
as
a
time
to
honor
and
recognize
the
service
and
sacrifices
of
our
men
and
women
in
uniform
who
are
transitioning
from
active
duty,
and
in
observance
of
Operation
Green
Light,
Beaufort
County
Council
encourages
all
citizens
to
participate
in
this
meaningful
tradition
by
displaying
green
lights
in
their
homes
or
businesses
throughout
the
month
of
November
as
a
tribute
to
those
who
have
made
profound
sacrifices
to
safeguard
our
freedom.
Dated this 9th day of November 2026.
___________________________________
Alice Howard, Chair
Beaufort County Council
~
Proclamation
~
Page 11 of 430
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
DESIGNATION OF DECEMBER 23, 2026, AS AN ADDITIONAL PAID HOLIDAY FOR COUNTY EMPLOYEES.
MEETING NAME AND DATE:
County Council November 9, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Administration recommends that County Council approve Wednesday, December 23, 2026, as an additional
paid Christmas holiday for eligible County employees.
PRESENTER INFORMATION:
Katherine Mead, Human Resources Director, 5 minutes
ITEM BACKGROUND:
Administration recommends that County Council consider approving Wednesday, December 23, 2026, as an
additional paid Christmas holiday for eligible County employees. Thursday, December 24, 2026, and Friday,
December 25, 2026, are already established County holidays. Approval of December 23 would provide
employees with three consecutive paid holidays in observance of Christmas.
FISCAL IMPACT:
Any fiscal impact is negligible.
APPROVAL HISTORY:
Page 12 of 430
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
AUTHORIZE THE COUNTY ADMINISTRATOR TO IMPLEMENT AN FY27 PERSONAL LEAVE TIME (PLT) BUYBACK
FOR EMPLOYEES.
MEETING NAME AND DATE:
County Council November 9, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval for the County Administrator to authorize a buyback program for FY27.
PRESENTER INFORMATION:
Katherine Mead, Human Resources Director, 5 minutes
ITEM BACKGROUND:
This program was offered to county employees from 2016-2025, with the exception of 2019. The program
allows county employees an opportunity to cash-out their accrued personal leave time, with a cap of 40 hours
or one-half of their balance, whichever is less. Employees must have a beginning balance of at least 24 hours
to participate.
FISCAL IMPACT:
The fiscal impact currently exists since the liability must be carried on our books.
FY26 fiscal impact was $763,029 (FICA/Medicare employer portion included), FY27 estimated impact is
$824,071 (8% increase from FY26, FICA/Medicare employer portion included).
The funds will come from vacancy lag from the appropriate Fund that the department is located in, i.e. GF, SRF
or EF.
APPROVAL HISTORY:
Page 13 of 430
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
APPROVAL OF A CONTRACT TO O'QUINN MARINE CONSTRUCTION FOR BROAD RIVER BOAT LANDING
FLOATING DOCK REPLACEMENT ($217,500)
MEETING NAME AND DATE:
County Council November 9, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of this contract with O'Quinn Marine Contracting for $217,500.00.
PRESENTER INFORMATION:
Bryan Bauer, PE, (5 minutes)
ITEM BACKGROUND:
The Broad River Boat Landing was identified in the 2025-26 Marine Facilities Inspection and Evaluation Report
as having several severe deficiencies, including damaged floating dock segments. IFB 092326 was solicited and
the lowest responsible bidder was O'Quinn Marine Construction for $197,500.00.
FISCAL IMPACT:
The contract fee for materials and construction is $197,500.00. Staff recommends a 10% contingency of
$19,750.00 for a total requested budget of $217,250.00. The funding for this project is from Broad River Boat
Ramp Improvement Project A/H award, account # 2001-10-0000-57130-RIVER, with a balance of $400,000.00.
APPROVAL HISTORY:
Page 14 of 430
2026 Marine Facility Inspection
Broad River Boat Landing
For
Beaufort County
By
McSweeney Engineers, LLC
Page 15 of 430
Marine Facilities Inspection Report
Inspection Date: January 26th, 2026
Inspection Personnel: Dave McSweeney, P.E., Curt McCarthy (ADCI), Mason Burriss,
E.I.T.
Facility Description: Broad River Boat Landing is a public access amenity managed by
Beaufort County and is located at 1050 Robert Smalls Parkway,
Beaufort, SC 29906. The facility consists of an approximately 140 ft
long by 8 ft wide L-shaped floating courtesy dock and an
approximately 32 ft wide, two-lane concrete boat ramp with a
concrete approach. The floating courtesy dock consists of (7)
aluminum framed dock segments with aluminum decking. The
courtesy dock is supported by ( 10) internally guided 14 in. square
concrete piles. The shoreline adjacent to the facility is protected by
riprap. For reporting purposes, dock segments are labeled
numerically, and piles are labeled alphabetically in accordance with
the inspection plan. Please refer to the Photograph Log and the
inspection plan included for typical views of the structure and
additional information.
Water Access To: Broad River
Maximum Water Depth: 9 ft
General Notes:
Concrete Boat Ramp:
1. The surface of the concrete boat ramp is generally in good condition with no major
defects observed. (Photograph 5)
Courtesy Floating Dock:
1. The aluminum decking was overall in good condition, exhibiting isolated minor
corrosion. (Photograph 6)
2. The floats and frame in the tidal zone were damaged in random locations throughout.
3. The concrete piles exhibited heavy marine growth within the tidal zone with no major
defects.
4. The HDPE pile guide rollers were severely worn in multiple locations.
5. Toe kicks were present on the pile guides.
6. Approximately 160 ft of rub rail was missing or damaged across all dock segments.
Shoreline:
1. The shoreline adjacent to the facility consisted of riprap which appeared stable.
Page 16 of 430
Location Specific Notes:
1. The HDPE roller was severely worn at the pile guide of Pile 2A. (Photograph 7)
2. The roller assembly was missing from the pile guide at Pile 3A. (Photograph 8)
3. The HDPE roller was severely worn at the pile guide of Pile 4A. (Photograph 9)
4. The northeast edge of the ramp exhibited undermining with up to 20 in. of penetration.
(Photograph 10)
5. The southwest edge of the ramp exhibited undermining with up to 12 in. of penetration.
(Photograph 11)
6. Dock Segment 7 had a missing aluminum pontoon. (Photograph 12)
7. Dock Segment 5 exhibited a broken pontoon strap. (Photograph 13)
8. A pontoon on Dock Segment 4 was punctured. (Photograph 14)
9. Filter Fabric was exposed on the southwest edge of the concrete abutment.
(Photograph 15)
10. The pile guide at Pile 7A is damaged. (Photograph 16)
Evaluation and Condition Ratings:
The condition of each waterfront facility component is presented using the format described in
the General Notes section of this report. Condition ratings follow the methodology and criteria
established in The American Society of Civil Engineers (ASCE) Manual of Practice No. 130, 2nd
Edition, Waterfront Facilities Inspection and Assessment (ASCE, 2025).
Concrete Boat Ramp:
The concrete boat ramp is rated Satisfactory (Code 5), indicating that the element is structurally
sound with only minor to moderate defects observed and no immediate repairs required. This
rating is primarily due to the observed undermining.
Courtesy Dock:
The courtesy dock is rated Poor (Code 3), indicating that major to severe deterioration or
overstressing is present on widespread portions of the structure and that repairs may be
required with moderate urgency. This rating is due to the missing pontoon float, broken
pontoon strap, and punctured pontoon.
Shoreline:
The shoreline is rated as Satisfactory (Code 5), denoting that limited minor to moderate defects
or deterioration are observed. This rating is due to the exposed filter fabric adjacent to the
concrete abutment.
Recommendations:
1. Replace float with missing pontoon
a. Opinion of Cost: $90,000
2. Replace broken pontoon strap
a. Opinion of Cost: $9,000
3. Replace or service HDPE rollers where necessary
a. Opinion of Cost: $15,000
Page 17 of 430
4. Replace damaged pile guide at Pile 7A
a. Opinion of Cost: $15,000
5. Patch punctured pontoon
a. Opinion of Cost: $3,000
6. Add additional riprap to the southwest edge of the concrete abutment
a. Opinion of Cost: $10,000
7. Re-inspect structure using the following as a guide:
a. Following significant storm events
b. At intervals not to exceed 24 months in accordance with ASCE MOP 130 standards.
Conclusion:
McSweeney Engineers greatly appreciates the opportunity to provide engineering services for
Beaufort County. If you have any questions regarding the inspection or this report, please do not
hesitate to contact us.
Respectfully Submitted,
William D. Barna, P.E.
McSweeney Engineers, LLC
Page 18 of 430
Photograph 1: Overall View of Structure.
Photograph 2: Overall View of Transition Plate and Structure.
Page 19 of 430
Photograph 3: Overall View of Structure.
Photograph 4: Overall View of the Ramp.
Page 20 of 430
Photograph 5: Typical Surface Condition of Concrete Ramp.
Photograph 6: Typical Aluminum Decking Condition.
Page 21 of 430
Photograph 7: Worn HDPE Roller at Pile 2A.
Photograph 8: Missing Roller Assembly at Pile 3A.
Page 22 of 430
Photograph 9: Worn HDPE Roller at Pile 4A.
Photograph 10: Undermining at Northeast Edge of the Ramp.
Page 23 of 430
Photograph 11: Undermining at Southwest Edge of the Ramp.
Photograph 12: Missing Pontoon on Dock Segment 7.
Page 24 of 430
Photograph 13: Broken Pontoon Strap on Dock Segment 5.
Photograph 14: Punctured Pontoon on Dock Segment 4.
Page 25 of 430
Photograph 15: Exposed Filter Fabric on the Southwest Edge of the Concrete Approach.
Photograph 16: Damaged Pile Guide on Pile 7A.
Page 26 of 430
I1
BROAD RIVER BOAT LANDING
LEGEND
PILE/DOCK SEGMENT NUMBER
LOCATION SPECIFIC DEFECTS
LANDING PLAN
1/8" = 1'
Page 27 of 430
Beaufort County, SC
Procurement
David Thomas, Director
PO Box 1228, Beaufort, SC 29902
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
RESPONSE DEADLINE: September 23, 2026 at 3:00 pm
Report Generated: Wednesday, September 23, 2026
SELECTED VENDOR TOTALS
Vendor Total
O’Quinn Marine
Construction
$197,500.00
Truluck Marine $269,864.00
Cape Romain Contractors,
Inc.
$273,766.80
NIX CONSTRUCTION $280,000.00
ARC Incorporated $293,999.99
McClam and Associates,
Inc
$309,750.00
TABLE 1 (Table 1 of 2)
ARC Incorporated Cape Romain
Contractors, Inc.
McClam and Associates,
Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Selected Line
Item
Description Quantity Unit of
Measure
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
X 1 General
Conditions
1 LS $25,500.00 $25,500.00 $8,800.00 $8,800.00 $25,000.00 $25,000.00 $40,556.39 $40,556.39 $5,000.00 $5,000.00
Page 28 of 430
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
EVALUATION TABULATION
Invitation For Bid - Broad River Boat Landing Floating Dock Replacement
Page 2
ARC Incorporated Cape Romain
Contractors, Inc.
McClam and Associates,
Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Selected Line
Item
Description Quantity Unit of
Measure
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
X 2 Mobilization and
demobilization
1 LS $20,000.00 $20,000.00 $41,229.30 $41,229.30 $12,750.00 $12,750.00 $10,561.18 $10,561.18 $10,000.00 $10,000.00
X 3 P & P Bonding 1 LS $4,500.00 $4,500.00 $3,700.00 $3,700.00 $2,500.00 $2,500.00 $6,586.54 $6,586.54 $1,651.00 $1,651.00
X 4 20' X 8'
aluminum dock
floating segment
with aluminum
pontoons and
interior pile
guides with
HDPE pile guide
rollers. Segments
to have ground
out protection.
4 ea $30,857.14 $123,428.56 $29,250.00 $117,000.00 $36,000.00 $144,000.00 $28,645.79 $114,583.16 $25,192.50 $100,770.00
X 5 20' X 8'
aluminum dock
floating segment
with interior pile
guides with
HDPE rollers and
aluminum
pontoons.
Aluminum cleats
to be placed at
strategic
intervals along
edge.
3 ea $30,857.14 $92,571.42 $27,250.00 $81,750.00 $36,000.00 $108,000.00 $27,311.45 $81,934.35 $25,193.00 $75,579.00
Page 29 of 430
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
EVALUATION TABULATION
Invitation For Bid - Broad River Boat Landing Floating Dock Replacement
Page 3
ARC Incorporated Cape Romain
Contractors, Inc.
McClam and Associates,
Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Selected Line
Item
Description Quantity Unit of
Measure
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
X 6 Installation and
maintainance
construction
fencing for
duration of the
project. Removal
at end of project
and return site to
usable
conditions.
1 LS $3,000.00 $3,000.00 $3,787.50 $3,787.50 $3,500.00 $3,500.00 $5,110.25 $5,110.25 $1,000.00 $1,000.00
X 7 Demolition and
removal of
existing floating
dock segments
7 ea $3,571.43 $25,000.01 $2,500.00 $17,500.00 $2,000.00 $14,000.00 $2,952.59 $20,668.13 $500.00 $3,500.00
Total $293,999.99 $273,766.80 $309,750.00 $280,000.00 $197,500.00
TABLE 1 (Table 2 of 2)
Truluck Marine
Selected Line Item Description Quantity Unit of
Measure
Unit Cost Total
X 1 General Conditions 1 LS $4,364.00 $4,364.00
X 2 Mobilization and demobilization 1 LS $25,000.00 $25,000.00
X 3 P & P Bonding 1 LS $8,000.00 $8,000.00
X 4 20' X 8' aluminum dock floating segment with aluminum pontoons
and interior pile guides with HDPE pile guide rollers. Segments to
have ground out protection.
4 ea $29,000.00 $116,000.00
Page 30 of 430
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
EVALUATION TABULATION
Invitation For Bid - Broad River Boat Landing Floating Dock Replacement
Page 4
Truluck Marine
Selected Line Item Description Quantity Unit of
Measure
Unit Cost Total
X 5 20' X 8' aluminum dock floating segment with interior pile guides
with HDPE rollers and aluminum pontoons. Aluminum cleats to be
placed at strategic intervals along edge.
3 ea $29,000.00 $87,000.00
X 6 Installation and maintainance construction fencing for duration of
the project. Removal at end of project and return site to usable
conditions.
1 LS $5,000.00 $5,000.00
X 7 Demolition and removal of existing floating dock segments 7 ea $3,500.00 $24,500.00
Total $269,864.00
VENDOR QUESTIONNAIRE PASS/FAIL
Question Title ARC Incorporated Cape Romain
Contractors, Inc.
McClam and
Associates, Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Truluck Marine
Certification Pass Pass Pass Pass Pass Pass
Contact information
of authorized
representative?
Pass Pass Pass Pass Pass Pass
Please Provide
Licenses and
Certificate of
Insurance
Pass Pass Pass Pass Pass Pass
100% Labor and
Material Payment
Bond
Pass Pass Pass Pass Pass Pass
Bidder Confirmation Pass Pass Pass Pass Pass Pass
Page 31 of 430
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
EVALUATION TABULATION
Invitation For Bid - Broad River Boat Landing Floating Dock Replacement
Page 5
Question Title ARC Incorporated Cape Romain
Contractors, Inc.
McClam and
Associates, Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Truluck Marine
Communications Pass Pass Pass Pass Pass Pass
Are you submitting
this bid as a local
vendor?
Pass Pass Pass Pass Pass Pass
Local Vendor
Preference -
Participation Affidavit
No Response No Response No Response Pass Pass No Response
Non-Collusion
Affidavit of Prime
Bidder
Pass Pass Pass Pass Pass Pass
Will you be using
subcontractors?
Pass Pass Pass Pass Pass Pass
Non-Collusion
Affidavit of
Subcontractor
No Response No Response Pass Pass No Response No Response
Certification By
Contractor Regarding
Non-Segregated
Facilities
Pass Pass Pass Pass Pass Pass
Business
Organization
Type of Business
Organization:
Pass Pass Pass Pass Pass Pass
If you selected
"Other" for your type
of business, please
explain:
Pass Pass Pass Pass Pass Pass
Page 32 of 430
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
EVALUATION TABULATION
Invitation For Bid - Broad River Boat Landing Floating Dock Replacement
Page 6
Question Title ARC Incorporated Cape Romain
Contractors, Inc.
McClam and
Associates, Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Truluck Marine
If applicable, please
provide name of
partners and
additional
information below:
Pass Pass Pass Pass Pass Pass
If your agency is a
Corporation:
Pass Pass Pass Pass Pass Pass
Are you a Subchapter
S Corporation?
Pass Pass Pass Pass Pass Pass
Please provide
Subchapter S
Shareholders:
No Response Pass No Response No Response No Response No Response
If individually owned: Pass Pass Pass Pass Pass Pass
Have you ever
operated under
another name?
Pass Pass Pass Pass Pass Pass
Please provide all
other business
names and addresses
of principal place of
business for each
business:
No Response No Response No Response No Response No Response Pass
Bonding
Bid Bond Pass Pass Pass Pass Pass Pass
Please provide the
Bonding information:
Pass Pass Pass Pass Pass Pass
Page 33 of 430
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
EVALUATION TABULATION
Invitation For Bid - Broad River Boat Landing Floating Dock Replacement
Page 7
Question Title ARC Incorporated Cape Romain
Contractors, Inc.
McClam and
Associates, Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Truluck Marine
Do you intend to use
any alternative form
of security
Pass Pass Pass Pass Pass Pass
Indicate the form of
security you intend
to use and the name,
address, point of
contact, and
telephone number of
the banks, savings
and loan, or surety
you intend to use.
(NOTE:
Prequalification will
not assure
acceptance of any
form of security.)
No Response No Response No Response No Response No Response No Response
Have any
Performance or
Payment Bond claims
ever been paid by
any surety on behalf
of your organization?
Pass Pass Pass Pass Pass Pass
Page 34 of 430
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
EVALUATION TABULATION
Invitation For Bid - Broad River Boat Landing Floating Dock Replacement
Page 8
Question Title ARC Incorporated Cape Romain
Contractors, Inc.
McClam and
Associates, Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Truluck Marine
State the name of
the project(s); the
date; the name,
address, telephone
number, and contact
person for the
claimant; the surety
satisfying the claim;
the size of the claim;
and the
circumstances giving
rise to the claim.
No Response No Response No Response No Response No Response No Response
Have you ever
arbitrated or litigated
a claim with an
Owner, Architect, or
Engineer in the last
five years?
Pass Pass Pass Pass Pass Pass
Page 35 of 430
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
EVALUATION TABULATION
Invitation For Bid - Broad River Boat Landing Floating Dock Replacement
Page 9
Question Title ARC Incorporated Cape Romain
Contractors, Inc.
McClam and
Associates, Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Truluck Marine
State the name of
the project(s); the
date; the name,
address, telephone
number, and contact
person for the
claimant; the surety
satisfying the claim;
the size of the claim;
and the
circumstances giving
rise to the claim.
(Provide attachments
if necessary.)
No Response No Response No Response No Response No Response No Response
Have you or any
officer, partner, or
owner of your
organization, in any
state or territory of
the United States, or
with respect to any
agency of the Federal
government:
In the last in the last
five years, received
any fines or citations
for building code
violations which
were unrelated to
design?
Pass Pass Pass Pass Pass Pass
Page 36 of 430
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
EVALUATION TABULATION
Invitation For Bid - Broad River Boat Landing Floating Dock Replacement
Page 10
Question Title ARC Incorporated Cape Romain
Contractors, Inc.
McClam and
Associates, Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Truluck Marine
Provide the name,
address, telephone
number, contact
person, and
circumstances
relating to the
question.
No Response No Response No Response No Response No Response No Response
Ever been found to
be guilty of charges
relating to conflicts
of interest:
Pass Pass Pass Pass Pass Pass
Provide the name,
address, telephone
number, contact
person, and
circumstances
relating to the
question.
No Response No Response No Response No Response No Response No Response
Ever been convicted
on charges related to
any criminal activity
relating to
construction means,
methods, or
techniques; bidding
or bid rigging; or
bribery?
Pass Pass Pass Pass Pass Pass
Page 37 of 430
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
EVALUATION TABULATION
Invitation For Bid - Broad River Boat Landing Floating Dock Replacement
Page 11
Question Title ARC Incorporated Cape Romain
Contractors, Inc.
McClam and
Associates, Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Truluck Marine
Provide the name,
address, telephone
number, contact
person, and
circumstances
relating to the
question.
No Response No Response No Response No Response No Response No Response
In the last five years,
been found guilty of
any minority
contracting law
violations?
Pass Pass Pass Pass Pass Pass
Provide the name,
address, telephone
number, contact
person, and
circumstances
relating to the
question.
No Response No Response No Response No Response No Response No Response
In the last five years,
pleaded no contest
in any criminal
proceeding related
to contracting?
Pass Pass Pass Pass Pass Pass
Page 38 of 430
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
EVALUATION TABULATION
Invitation For Bid - Broad River Boat Landing Floating Dock Replacement
Page 12
Question Title ARC Incorporated Cape Romain
Contractors, Inc.
McClam and
Associates, Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Truluck Marine
Provide the name,
address, telephone
number, contact
person, and
circumstances
relating to the
question.
No Response No Response No Response No Response No Response No Response
Ever been disbarred
from doing Federal,
state, or local
government work for
any reason?
Pass Pass Pass Pass Pass Pass
Provide the name,
address, telephone
number, contact
person, and
circumstances
relating to the
question.
No Response No Response No Response No Response No Response No Response
Ever been
terminated on a
contract due to your
default?
Pass Pass Pass Pass Pass Pass
Provide the name,
address, telephone
number, contact
person, and
circumstances
relating to the
question.
No Response No Response No Response No Response No Response No Response
Page 39 of 430
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
EVALUATION TABULATION
Invitation For Bid - Broad River Boat Landing Floating Dock Replacement
Page 13
Question Title ARC Incorporated Cape Romain
Contractors, Inc.
McClam and
Associates, Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Truluck Marine
In the last five years,
paid liquidated
damages for being
late on a project?
Pass Pass Pass Pass Pass Pass
Provide the name,
address, telephone
number, contact
person, and
circumstances
relating to the
question.
No Response No Response No Response No Response No Response No Response
In the last five years,
been subject to tax
collection
proceedings?
Pass Pass Pass Pass Pass Pass
Provide the name,
address, telephone
number, contact
person, and
circumstances
relating to the
question.
No Response No Response No Response No Response No Response No Response
In the last seven
years, filed for
bankruptcy?
Pass Pass Pass Pass Pass Pass
Page 40 of 430
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
EVALUATION TABULATION
Invitation For Bid - Broad River Boat Landing Floating Dock Replacement
Page 14
Question Title ARC Incorporated Cape Romain
Contractors, Inc.
McClam and
Associates, Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Truluck Marine
Provide the name,
address, telephone
number, contact
person, and
circumstances
relating to the
question.
No Response No Response No Response No Response No Response No Response
Under what chapter
of bankruptcy did
you file?
No Response No Response No Response No Response No Response No Response
If you filed under
Chapter 11
Reorganization, how
long did you operate
under this status?
No Response No Response No Response No Response No Response No Response
Are you operating
under Chapter 11
status now?
No Response No Response No Response No Response No Response No Response
Safety
Page 41 of 430
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
EVALUATION TABULATION
Invitation For Bid - Broad River Boat Landing Floating Dock Replacement
Page 15
Question Title ARC Incorporated Cape Romain
Contractors, Inc.
McClam and
Associates, Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Truluck Marine
Have you, in the last
three years, been
cited for willful
violations for failure
to abate, or for
repeated violations,
by the United States
Occupational Safety
and Health
Administration or by
the South Carolina
Occupational Safety
and Health
Administration or by
any other
governmental body?
Pass Pass Pass Pass Pass Pass
State date, name,
address, telephone
number, and contact
person for agency
issuing citation and
the nature of the
violation. Also, advise
the amount of fines
paid, if any. Provide
attachments if
necessary.
No Response No Response No Response No Response No Response No Response
Page 42 of 430
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
EVALUATION TABULATION
Invitation For Bid - Broad River Boat Landing Floating Dock Replacement
Page 16
Question Title ARC Incorporated Cape Romain
Contractors, Inc.
McClam and
Associates, Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Truluck Marine
List your worker’s
compensation
experience modifier
for the last three
years.
No Response No Response No Response No Response No Response No Response
References
Provide at least two
references from each
industry group listed.
Provide other
references as
requested. Provide
current names,
addresses, telephone
numbers, and
contacts.
Pass Pass Pass Pass Pass Pass
Certification
regarding
Debarment,
Suspension,
Ineligibility, and
Voluntary Exclusion:
The contractor
certifies:
Pass Pass Pass Pass Pass Pass
Explain fully if it has
been involved in any
litigation involving
performance.
No Response Pass No Response No Response No Response No Response
Page 43 of 430
EVALUATION TABULATION
IFB No. 092326
Broad River Boat Landing Floating Dock Replacement
EVALUATION TABULATION
Invitation For Bid - Broad River Boat Landing Floating Dock Replacement
Page 17
Question Title ARC Incorporated Cape Romain
Contractors, Inc.
McClam and
Associates, Inc
NIX CONSTRUCTION O’Quinn Marine
Construction
Truluck Marine
Small and Minority
Business
Participation
Program
Are you a Small or
Minority Business ?
Pass Pass Pass Pass Pass Pass
Upload your
Small/Minority
Documentation
Pass Pass No Response No Response No Response Pass
Are you self-
performing 100%?
Pass Pass Pass Pass Pass Pass
Self-Performing
100% Affidavit
Pass Pass No Response No Response Pass Pass
Good Faith Agencies
Distribution List
No Response No Response Pass Pass No Response No Response
Page 44 of 430
Page 45 of 430
Page 46 of 430
Page 47 of 430
Page 48 of 430
Page 49 of 430
Page 50 of 430
Page 51 of 430
Page 52 of 430
Page 53 of 430
Page 54 of 430
Page 55 of 430
Page 56 of 430
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
APPROVAL OF A CONTRACT TO NIX CONSTRUCTION FOR THE CONSTRUCTION OF THE BAILEY MEMORIAL
PARK PROJECT ($1,982,400.00).
MEETING NAME AND DATE:
County Council November 9, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Facilities Management recommends the approval of the contract award to Nix Construction as the lowest
responsive bidder in the amount of ($1,982,400.00) for the Bailey Memorial Park project.
PRESENTER INFORMATION:
Ron Lewis, Facilities Management Project Manager II, (5 mins)
ITEM BACKGROUND:
Bailey Memorial Park is located within the Alljoy Community off Confederate Avenue in Bluffton, South
Carolina. As part of the property acquisition, restrictive covenants were established requiring the property to
remain a passive park. The property was acquired with strong community support and donor funding, which
helped make possible the development of the conceptual masterplan and civil engineering documents.
Because of the significance of the property donation and the strong public interest in preserving and
improving the site, Bailey Memorial Park has been designated as a Tier 2 Priority Project within Beaufort
County’s Passive Parks Program.
The Bailey Memorial Park project will provide the community with a passive recreational space that supports
walking, wildlife observation, and outdoor enjoyment while maintaining the natural character of the property.
A total of five (5) bids were received for the Bailey Memorial Park project. The contract award is being issued
to Nix Construction in the amount of ($1,652,000.00), inclusive of the ($152,000.00) Composite Boardwalk
Decking bid alternate plus a 20% contingency ($330,400.00).
FISCAL IMPACT:
A Contract to Nix Construction for the construction of the Bailey Memorial Park Project ($1,982,400.00)
(FISCAL IMPACT: The contract fee is for the construction of the Bailey Memorial Park in the amount of
$1,652,000.00 plus a 20% contingency ($330,400.00), bringing the total request to $1,982,400.00. The funding
for this project will be from the 2025 GO Bond in the GL account 4013-80-1610-54420 in the amount of
($1,982,400.00) and the account balance is ($5,940,912.00).
APPROVAL HISTORY:
N/A
Page 57 of 430
Page 58 of 430
Beaufort County, SC
Capital Projects/Facilities
Frank Stroncheck, Director
PO Box 1228, Beaufort, SC 29902
EVALUATION TABULATION
IFB No. 080626
Bailey Memorial Park Project
RESPONSE DEADLINE: August 6, 2026 at 3:00 pm
Report Generated: Thursday, October 1, 2026
SELECTED VENDOR TOTALS
Vendor Total
NIX CONSTRUCTION $1,652,000.00
Rhowe Design + Build, LLC $1,880,601.00
Charles Blanchard Const
Corp
$2,000,704.37
IPW Construction Group,
LLC
$2,077,790.39
JHC Corporation $2,108,376.00
BAILEY MEMORIAL PARK
Page 59 of 430
EVALUATION TABULATION
IFB No. 080626
Bailey Memorial Park Project
EVALUATION TABULATION
Invitation For Bid - Bailey Memorial Park Project
Page 2
BAILEY MEMORIAL PARK Charles Blanchard Const
Corp
IPW Construction Group,
LLC
JHC Corporation NIX CONSTRUCTION Rhowe Design + Build, LLC
Selecte
d
Line
Ite
m
Description Quantit
y
Unit of
Measur
e
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
X 1 General
Conditions
(Bonds,
Insurance, &
Supervision,
Mobilization,
Project Staking &
Layout)
1 LS $183,579.05 $183,579.05 $87,500.00 $87,500.00 $447,000.00 $447,000.00 $187,174.0
0
$187,174.00 $106,573.0
0
$106,573.00
X 2 Permits,
Business Lic. &
Fees
1 LS $37,845.92 $37,845.92 $6,250.00 $6,250.00 $10,000.00 $10,000.00 $8,193.00 $8,193.00 $131,531.0
0
$131,531.00
X 3 Demolition 1 LS $52,080.00 $52,080.00 $156,250.0
0
$156,250.00 $90,000.00 $90,000.00 $31,958.00 $31,958.00 $112,950.0
0
$112,950.00
X 4 Site / Civil 1 LS $312,513.60 $312,513.60 $719,633.7
5
$719,633.75 $71,183.00 $71,183.00 $85,778.00 $85,778.00 $324,212.0
0
$324,212.00
X 5 Erosion Control 1 LS $6,720.00 $6,720.00 $12,500.00 $12,500.00 $20,000.00 $20,000.00 $11,669.00 $11,669.00 $48,583.00 $48,583.00
X 6 Hardscape/Layo
ut
1 LS $128,800.00 $128,800.00 $187,500.0
0
$187,500.00 $265,193.00 $265,193.00 $313,245.0
0
$313,245.00 $142,764.0
0
$142,764.00
X 7 Structural 1 LS $1,207,808.0
0
$1,207,808.0
0
$750,000.0
0
$750,000.00 $1,000,000.0
0
$1,000,000.0
0
$857,428.0
0
$857,428.00 $739,300.0
0
$739,300.00
X 8 Landscape &
Irrigation
1 LS $16,732.80 $16,732.80 $15,000.00 $15,000.00 $5,000.00 $5,000.00 $4,555.00 $4,555.00 $0.00 $0.00
Total $1,946,079.3
7 $1,934,633.7
5 $1,908,376.0
0 $1,500,000.0
0 $1,605,913.0
0
ALTERNATE-DECKING
Page 60 of 430
EVALUATION TABULATION
IFB No. 080626
Bailey Memorial Park Project
EVALUATION TABULATION
Invitation For Bid - Bailey Memorial Park Project
Page 3
Alternate-Decking Charles Blanchard Const
Corp
IPW Construction Group,
LLC
JHC Corporation NIX CONSTRUCTION Rhowe Design + Build, LLC
Selected Line
Item
Description Quantity Unit of
Measure
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
X 1 Composite
Boardwalk
Decking
1 LS $54,625.00 $54,625.00 $143,156.64 $143,156.64 $200,000.00 $200,000.00 $152,000.00 $152,000.00 $274,688.00 $274,688.00
Total $54,625.00 $143,156.64 $200,000.00 $152,000.00 $274,688.00
VENDOR QUESTIONNAIRE PASS/FAIL
Question Title Charles Blanchard Const
Corp
IPW Construction Group,
LLC
JHC Corporation NIX CONSTRUCTION Rhowe Design + Build,
LLC
Certification Pass Pass Pass Pass Pass
Contact information of
authorized
representative?
Pass Pass Pass Pass Pass
Please Provide Licenses
and Certificate of
Insurance
Pass Pass Pass Pass Pass
100% Labor and Material
Payment Bond
Pass Pass Pass Pass Pass
Bidder Confirmation Pass Pass Pass Pass Pass
Communications Pass Pass Pass Pass Pass
Are you submitting this
bid as a local vendor?
Pass Pass Pass Pass Pass
Local Vendor Preference
- Participation Affidavit
No Response No Response No Response Pass No Response
Non-Collusion Affidavit
of Prime Bidder
Pass Pass Pass Pass Pass
Page 61 of 430
EVALUATION TABULATION
IFB No. 080626
Bailey Memorial Park Project
EVALUATION TABULATION
Invitation For Bid - Bailey Memorial Park Project
Page 4
Question Title Charles Blanchard Const
Corp
IPW Construction Group,
LLC
JHC Corporation NIX CONSTRUCTION Rhowe Design + Build,
LLC
Will you be using
subcontractors?
Pass Pass Pass Pass Pass
Non-Collusion Affidavit
of Subcontractor
Pass Pass Pass Pass Pass
Certification By
Contractor Regarding
Non-Segregated Facilities
Pass Pass Pass Pass Pass
Business Organization
Type of Business
Organization:
Pass Pass Pass Pass Pass
If you selected "Other"
for your type of business,
please explain:
Pass Pass Pass Pass Pass
If applicable, please
provide name of
partners and additional
information below:
Pass Pass Pass Pass Pass
If your agency is a
Corporation:
Pass Pass Pass Pass Pass
Are you a Subchapter S
Corporation?
Pass Pass Pass Pass Pass
Please provide
Subchapter S
Shareholders:
No Response Pass Pass No Response Pass
If individually owned: Pass Pass Pass Pass Pass
Have you ever operated
under another name?
Pass Pass Pass Pass Pass
Page 62 of 430
EVALUATION TABULATION
IFB No. 080626
Bailey Memorial Park Project
EVALUATION TABULATION
Invitation For Bid - Bailey Memorial Park Project
Page 5
Question Title Charles Blanchard Const
Corp
IPW Construction Group,
LLC
JHC Corporation NIX CONSTRUCTION Rhowe Design + Build,
LLC
Please provide all other
business names and
addresses of principal
place of business for
each business:
Pass Pass No Response No Response No Response
Bonding
Bid Bond Pass Pass Pass Pass Pass
Please provide the
Bonding information:
Pass Pass Pass Pass Pass
Do you intend to use any
alternative form of
security
Pass Pass Pass Pass Pass
Indicate the form of
security you intend to
use and the name,
address, point of
contact, and telephone
number of the banks,
savings and loan, or
surety you intend to use.
(NOTE: Prequalification
will not assure
acceptance of any form
of security.)
No Response No Response No Response No Response No Response
Have any Performance or
Payment Bond claims
ever been paid by any
surety on behalf of your
organization?
Pass Pass Pass Pass Pass
Page 63 of 430
EVALUATION TABULATION
IFB No. 080626
Bailey Memorial Park Project
EVALUATION TABULATION
Invitation For Bid - Bailey Memorial Park Project
Page 6
Question Title Charles Blanchard Const
Corp
IPW Construction Group,
LLC
JHC Corporation NIX CONSTRUCTION Rhowe Design + Build,
LLC
State the name of the
project(s); the date; the
name, address,
telephone number, and
contact person for the
claimant; the surety
satisfying the claim; the
size of the claim; and the
circumstances giving rise
to the claim.
No Response No Response No Response No Response No Response
Have you ever arbitrated
or litigated a claim with
an Owner, Architect, or
Engineer in the last five
years?
Pass Pass Pass Pass Pass
State the name of the
project(s); the date; the
name, address,
telephone number, and
contact person for the
claimant; the surety
satisfying the claim; the
size of the claim; and the
circumstances giving rise
to the claim. (Provide
attachments if
necessary.)
No Response No Response No Response No Response No Response
Page 64 of 430
EVALUATION TABULATION
IFB No. 080626
Bailey Memorial Park Project
EVALUATION TABULATION
Invitation For Bid - Bailey Memorial Park Project
Page 7
Question Title Charles Blanchard Const
Corp
IPW Construction Group,
LLC
JHC Corporation NIX CONSTRUCTION Rhowe Design + Build,
LLC
Have you or any officer,
partner, or owner of
your organization, in any
state or territory of the
United States, or with
respect to any agency of
the Federal government:
In the last in the last five
years, received any fines
or citations for building
code violations which
were unrelated to
design?
Pass Pass Pass Pass Pass
Provide the name,
address, telephone
number, contact person,
and circumstances
relating to the question.
No Response No Response No Response No Response No Response
Ever been found to be
guilty of charges relating
to conflicts of interest:
Pass Pass Pass Pass Pass
Provide the name,
address, telephone
number, contact person,
and circumstances
relating to the question.
No Response No Response No Response No Response No Response
Page 65 of 430
EVALUATION TABULATION
IFB No. 080626
Bailey Memorial Park Project
EVALUATION TABULATION
Invitation For Bid - Bailey Memorial Park Project
Page 8
Question Title Charles Blanchard Const
Corp
IPW Construction Group,
LLC
JHC Corporation NIX CONSTRUCTION Rhowe Design + Build,
LLC
Ever been convicted on
charges related to any
criminal activity relating
to construction means,
methods, or techniques;
bidding or bid rigging; or
bribery?
Pass Pass Pass Pass Pass
Provide the name,
address, telephone
number, contact person,
and circumstances
relating to the question.
No Response No Response No Response No Response No Response
In the last five years,
been found guilty of any
minority contracting law
violations?
Pass Pass Pass Pass Pass
Provide the name,
address, telephone
number, contact person,
and circumstances
relating to the question.
No Response No Response No Response No Response No Response
In the last five years,
pleaded no contest in
any criminal proceeding
related to contracting?
Pass Pass Pass Pass Pass
Provide the name,
address, telephone
number, contact person,
and circumstances
relating to the question.
No Response No Response No Response No Response No Response
Page 66 of 430
EVALUATION TABULATION
IFB No. 080626
Bailey Memorial Park Project
EVALUATION TABULATION
Invitation For Bid - Bailey Memorial Park Project
Page 9
Question Title Charles Blanchard Const
Corp
IPW Construction Group,
LLC
JHC Corporation NIX CONSTRUCTION Rhowe Design + Build,
LLC
Ever been disbarred
from doing Federal,
state, or local
government work for any
reason?
Pass Pass Pass Pass Pass
Provide the name,
address, telephone
number, contact person,
and circumstances
relating to the question.
No Response No Response No Response No Response No Response
Ever been terminated on
a contract due to your
default?
Pass Pass Pass Pass Pass
Provide the name,
address, telephone
number, contact person,
and circumstances
relating to the question.
No Response No Response No Response No Response No Response
In the last five years, paid
liquidated damages for
being late on a project?
Pass Pass Pass Pass Pass
Provide the name,
address, telephone
number, contact person,
and circumstances
relating to the question.
No Response No Response No Response No Response No Response
In the last five years,
been subject to tax
collection proceedings?
Pass Pass Pass Pass Pass
Page 67 of 430
EVALUATION TABULATION
IFB No. 080626
Bailey Memorial Park Project
EVALUATION TABULATION
Invitation For Bid - Bailey Memorial Park Project
Page 10
Question Title Charles Blanchard Const
Corp
IPW Construction Group,
LLC
JHC Corporation NIX CONSTRUCTION Rhowe Design + Build,
LLC
Provide the name,
address, telephone
number, contact person,
and circumstances
relating to the question.
No Response No Response No Response No Response No Response
In the last seven years,
filed for bankruptcy?
Pass Pass Pass Pass
Provide the name,
address, telephone
number, contact person,
and circumstances
relating to the question.
No Response No Response No Response No Response No Response
Under what chapter of
bankruptcy did you file?
No Response No Response No Response No Response No Response
If you filed under
Chapter 11
Reorganization, how long
did you operate under
this status?
No Response No Response No Response No Response No Response
Are you operating under
Chapter 11 status now?
No Response No Response No Response No Response No Response
Safety
Page 68 of 430
EVALUATION TABULATION
IFB No. 080626
Bailey Memorial Park Project
EVALUATION TABULATION
Invitation For Bid - Bailey Memorial Park Project
Page 11
Question Title Charles Blanchard Const
Corp
IPW Construction Group,
LLC
JHC Corporation NIX CONSTRUCTION Rhowe Design + Build,
LLC
Have you, in the last
three years, been cited
for willful violations for
failure to abate, or for
repeated violations, by
the United States
Occupational Safety and
Health Administration or
by the South Carolina
Occupational Safety and
Health Administration or
by any other
governmental body?
Pass Pass Pass Pass
State date, name,
address, telephone
number, and contact
person for agency issuing
citation and the nature
of the violation. Also,
advise the amount of
fines paid, if any. Provide
attachments if
necessary.
No Response No Response No Response No Response No Response
List your worker’s
compensation
experience modifier for
the last three years.
No Response No Response No Response No Response No Response
References
Page 69 of 430
EVALUATION TABULATION
IFB No. 080626
Bailey Memorial Park Project
EVALUATION TABULATION
Invitation For Bid - Bailey Memorial Park Project
Page 12
Question Title Charles Blanchard Const
Corp
IPW Construction Group,
LLC
JHC Corporation NIX CONSTRUCTION Rhowe Design + Build,
LLC
Provide at least two
references from each
industry group listed.
Provide other references
as requested. Provide
current names,
addresses, telephone
numbers, and contacts.
Pass Pass Pass Pass
Certification regarding
Debarment, Suspension,
Ineligibility, and
Voluntary Exclusion:
The contractor certifies: Pass Pass Pass Pass
Explain fully if it has been
involved in any litigation
involving performance.
No Response No Response No Response No Response No Response
Small and Minority
Business Participation
Program
Are you a Small or
Minority Business ?
Pass Pass Pass Pass Pass
Upload your
Small/Minority
Documentation
No Response No Response Pass No Response Pass
Are you self-performing
100%?
Pass Pass Pass Pass Pass
Self-Performing 100%
Affidavit
No Response No Response No Response No Response No Response
Page 70 of 430
EVALUATION TABULATION
IFB No. 080626
Bailey Memorial Park Project
EVALUATION TABULATION
Invitation For Bid - Bailey Memorial Park Project
Page 13
Question Title Charles Blanchard Const
Corp
IPW Construction Group,
LLC
JHC Corporation NIX CONSTRUCTION Rhowe Design + Build,
LLC
Good Faith Agencies
Distribution List
Pass Pass Pass Pass Pass
Page 71 of 430
1
STATE OF SOUTH CAROLINA )
) CONTRACT
COUNTY OF BEAUFORT ) Bailey Memorial Park Project
THIS CONTRACT (hereinafter the "Contract") entered into this 19 th day of August 2026, between the
COUNTY OF BEAUFORT, South Carolina, a public body corporate and politic and political subdivision
of the State of South Carolina, (hereinafter "County") and NIX CONSTRUCTION, (hereinafter the
"Contractor"), ("Party" as to each; collectively the "Parties")
WITNESSETH:
WHEREAS, the County wishes to contract for Bailey Memorial Park Project (the "Work" and/or
"Services"); and
WHEREAS, the Contractor has represented to the County that its staff is qualified to provide the Work
required in this Contract in a professional, timely manner; and
WHEREAS, the County has relied upon the above representations by the Contractor;
NOW, THEREFORE, in consideration of these premises and covenants set forth herein, it is agreed by and
between the Parties as follows:
SECTION ONE
Contract Documents
The Parties agree that the Contract Documents shall include the following, which are incorporated herein
by reference:
Exhibit A: Contractor's Bid dated August 6, 2026.
Exhibit B: IFB #080626
In the event of any conflict, discrepancy, or inconsistency among any of the documents which make up this
Contract, the following shall control:
As between the Contract and the Contract Documents which make up this Contract, the Contract
shall govern.
In the event of any conflict, discrepancy, or inconsistency among any of the Contract Documents,
the Contractor shall notify the County immediately upon discovery of the same for resolution by the
County.
Any documents not included or expressly contemplated in this Contract do not, and shall not, form
a part of this Contract. The Contract Documents are intended to be complementary, and a
requirement in one document shall be deemed a requirement in all documents.
SECTION TWO
Scope of Work
The Contractor agrees to perform and furnish all labor, supervision, materials, equipment, transportation
and supplies necessary for the completion of the Work required under this Contract in a timely and
Page 72 of 430
2
workmanlike manner, professional in all aspects, and in accord with all applicable laws, rules and
regulations.
The Contractor shall provide the services outlined below in conjunction with the Contractor's Bid dated
August 6, 2026 marked as Exhibit A, that was previously incorporated by reference. The Contractor shall
commence the Work as specified in the Notice to Proceed, when it is issued, but not before it is issued.
Coordination of the Work and administration of this Contract shall be by Beaufort County.
SECTION THREE
Contract Price: Payment Terms
County agrees to pay for the performance of the Work described in this Contract, including all items
necessary to accomplish and complete the Work, in accordance with all terms and conditions as stated
herein on the following basis:
Contract Amount: One Million Six Hundred Fifty -Two Thousand Dollars and Zero Cents
($1,652,000.00)
Payments:
Contractor will be paid on a percentage complete basis with the submission of monthly invoices.
Monthly payments will be made based on a percentage of services rendered and any expenses incurred.
Final payment which shall be paid upon Final Acceptance by the County's authorized representative. Final
Acceptance is defined as the County accepting the Work from the Contractor when the County deems the
Work completed in accordance with the terms of the Contract.
Final Payment is defined as the last payment from the County to the Contractor of the entire unpaid balance
of the Contract sum as adjusted by any approved change orders.
Application for payment shall be prepared and submitted electronically. All invoices shall be addressed to
Capital Projects, PO Drawer 1228 Beaufort SC 29901.
SECTION FOUR
Time: Term of Contract
The County hereby contracts with Contractor to provide the Work specified herein within 245 Days
calendar days after issuance of the Notice to Proceed.
The County reserves the right to extend the term of this Contract, if it is determined to be in its best interest.
The Contractor expressly acknowledges that time is of the essence in completion of this Contract and that
the time limits and dates herein are critical components of the Contract. Therefore, Liquidated Damages
are set at $400 per calendar day. The Contractor warrants and represents that it has taken these facts into
consideration and has determined that it can complete the work within these time limits, including time for
likely delays caused by weather or from other sources. The Contractor will not be compensated for any
delays beyond the time set forth herein. The Contractor's only remedy for delays may be an extension of
time to perform the Work. Due consideration will be given to claims for an extension of time due to
extraordinary circumstances only.
Page 73 of 430
3
SECTION FIVE
Insurance Requirements
The Contractor, at its own expense, shall at all times during the term of the Contract, maintain insurance as
included in the solicitation, Insurance Requirements, which is attached hereto and previously incorporated
by reference. The County may contact the Contractor's insurer(s) or insurer(s)' agent(s) directly at any time
regarding the Contractor's coverages, coverage amounts, or other such relevant and reasonable issues
related to this Contract. The Contractor shall also require any subcontractors to ca rry the same coverages
in the same amounts.
The County must be advised immediately of any changes in required coverages.
SECTION SIX
Compliance with Legal Requirements
All applicable federal, state and local laws, ordinances, and rules and regulations of any authorities
(including, but not limited to, any laws, ordinances or regulations relating to the S.C. Department of
Revenue or the S.C. Board of Contractors) shall be binding upon the Contractor throughout the pendency
of the Work. The Contractor shall be responsible for compliance with any such law, ordinance, rule or
regulation, and shall hold the County harmless and indemnify same in the event of non- compliance as set
forth in the Contract.
The Contractor certifies that it will comply with the applicable requirements of Title 8, Chapter 14 of South
Carolina Code of Laws (1976, as amended) and agrees to provide to the State upon request any
documentation required to establish either: (a) that Title 8, Chapter 14 is inapplicable to the Contractor and
its subcontractors or sub -subcontractors; or (b) that the Contractor and its subcontractors or
subsubcontractors are in compliance with Title 8, Chapter 14.
Pursuant to Section 8- 14-60, "A person who knowingly makes or files any false, fictitious, or fraudulent
document, statement, or report pursuant to this chapter is guilty of a felony and, upon conviction, must be
fined within the discretion of the Court or imprisoned for not more than five years, or both."
The Contractor agrees to include in any contracts with subcontractors, language requiring subcontractors
to (a) comply with applicable requirements of Title 8, Chapter 14, and (b) include in its contracts with the
subcontractors language requiring the sub- subcontractors to comply with the applicable requirements of
Title 8, Chapter 14.
The Contractor agrees to and shall certify agreement to abide by the requirements under Title VI of the
Civil Rights Act of 1964, and other non-discrimination authorities under Federal Executive Order Number
11246, as amended, and specifically the provisions of the equal opportunity clause.
The Contractor shall comply with all federal, state and local laws, ordinances, rules and regulations of any
authorities throughout the duration of this Contract. The Contractor shall be responsible for compliance
with any such law, ordinance, rule or regu lation, and shall hold the County harmless and indemnify same
in the event of non-compliance.
Page 74 of 430
4
SECTION SEVEN
Drug-free Workplace Act
The Contractor shall comply with the South Carolina Drug-free Workplace Act, Section 44-107-10 et seq.,
S.C. Code of Laws (1976, as amended). The County requires all contractors executing contracts for a stated
or estimated value of $50,000 or more to sign a Drug-free Workplace Certification form prior to the issuance
of the Notice to Proceed.
SECTION EIGHT
Contractor's Warranties and Representations
The Contractor represents that its staff is knowledgeable about and experienced in performing the Work
required in this Contract and warrants that it will use best skill and attention to provide above described
Work in a professional, timely manner.
The Contractor warrants and represents that it shall be responsible for all subcontractors working directly
for it, as well as for their work product, as though the Contractor had performed the Work itself.
1. If equipment, materials and supplies are to be a part of the service provided, all equipment,
materials, and supplies incorporated in the Work covered by the bid and provided by the
Contractor are to be new and of the most suitable grade for the purpose intended. Unless
otherwise specifically provided in this Contract, reference to any equipment, material, article or
patented process, by trade name, make or catalog number, shall not be construed as limiting
competition. When requested, the Contractor shall furnish to the Purchasing Director, for
approval the name of the manufacturer, the model number, and other identifying data and
information respecting the performance, capacity, nature and rating of the machinery and
mechanical and other equipment which the Contractor contemplates incorporating in the Work.
When required by this Contract or when called for by the Purchasing Director, the Contractor
shall provide full information concerning the material or articles that he contemplates
incorporating in the Work. When so directed, samples shall be submitted for approval at the
Contractor's expense, with all shipping charges prepaid. Machinery, equipment, material and
articles installed or used without the required prior approval of the County shall be at the risk of
subsequent rejection by the County.
2. Any and all manufacturers' warranties on any equipment or materials will be passed on to the
County and copies of said warranties will be furnished by the Contractor to the County upon
completion and final acceptance of the Work.
3. The Purchasing Director may, in writing, require the Contractor to remove from the Work Site
any employee the Purchasing Director deems incompetent, careless or otherwise objectionable.
4. In addition to any manufacturer's warranties, all labor and materials are warranted to be free from
defects for a period of twelve (12) months after the date of Final Payment by the County.
Page 75 of 430
5
SECTION NINE
Retention of Records
The Contractor agrees to maintain for three (3) years from the date of Final Payment, or until the end of
any audit or closure of all pending matters under this Contract, whichever is later, all books, documents,
papers, and records pertinent to this Contract. The Contractor agrees to provide to the County, any federal
grantor agency, the Comptroller General of the United States, any state gantor agency, any assignee, or any
of their duly authorized representatives access to such books, documents, papers, a nd records for the
purpose of examining, auditing, and copying them. The Contractor further agrees to include these
provisions in any subcontracts issued in connection with this Contract.
SECTION TEN
State and Local Taxes
Except as otherwise provided, Contract prices shall include all applicable state and local taxes.
The Contractor shall calculate that portion of the Contract that is subject to the South Carolina sales and/or
use tax, and this amount shall be itemized and shown on all invoices, and shall be paid to the SCDOR by
Contractor. If Contractor is a non-South Carolina Company, the County will withhold said amount from all
invoices and remit payment to the SCDOR, unless the Contractor furnishes the County with a valid South
Carolina Use Tax Registration Certificate Number.
The Contractor shall indemnify and hold harmless the County for any loss, cost, or expense incurred by,
levied upon or billed to the County as a result of the Contractor's failure to pay any tax of any type due in
connection with this Contract.
The Contractor shall ensure that the above sections are included in all subcontracts and sub -subcontracts,
and shall ensure withholding on out of state sub and sub-subcontractors to which withholding is applicable.
SECTION ELEVEN
Independent Contractor
The Contractor is an independent contractor and shall not be deemed the agent or employee of the County
for any purpose whatsoever. Contractor shall not hold himself out as an employee of the County, and shall
have no power or authority to bind or obligate the County in any manner, except the County shall make
payment to the Contractor for work and expenses as herein provided. The Contractor shall obtain and
maintain all licenses and permits required by law for performance of this Contract by him or his employees,
agents, and servants. The Contractor shall be liable for and pay all taxes required by local, state or federal
governments, including but not limited to social security, Workers' Compensation, employment security,
and any other taxes and licenses or insurance premiums required by law. No employee benefits of any kind
shall be paid by the County to or for the benefit of the Contractor or its employees, agents, or servants by
reason of this Contract.
SECTION TWELVE
Other Contracts
The County reserves the right to undertake or award other contracts for additional work/services, and may
elect to complete portions of the Work/Services included in this Contract using its own forces or through
other contracts, and the Contractor shall fully cooperate with such other contractors, County employees and
Page 76 of 430
6
carefully fit its own work/services to such work/services as may be directed by the County. The Contractor
shall not commit or permit any act by its forces or subcontractors which will interfere with the performance
of work/services by any other contractor or by County and or Department employees
SECTION THIRTEEN
Permits and Licenses
The Contractor shall, without additional expense to the County, be responsible for obtaining and
maintaining all necessary licenses and permits required by the State of South Carolina, a municipality or
the County or any other authority having jurisdiction. Prior to execution of a contract, the Contractor may
be required to provide a copy of its current applicable Contractor's License issued by the State of South
Carolina and business license issued by the County. Contractor's (and or any subcontractor's) L icense
Number, Person's Name and Business Name must all be shown on all required licenses.
SECTION FOURTEEN
Safety, Health, and Security Precautions
The Contractor shall take proper safety, health and security precautions to protect its workers and the
County's property, workers and the public at all times during the term of this Contract. All materials shall
be stored securely, protected from theft or damage.
SECTION FIFTEEN
Inspection and Acceptance
All Work shall be subject to inspection and testing by the County at all reasonable times and places. The
Contractor shall, without charge, correct any workmanship found by the County not to conform to the
Contract requirements.
SECTION SIXTEEN
Conditions Affecting the Work
The Contractor shall be responsible for having taken steps reasonably necessary to ascertain the nature and
location of the Work, and the general and local conditions that can affect the Work or the cost thereof. Any
failure by the Contractor to do so will not relieve the Contractor from responsibility for successfully
performing the Work without additional expense to the County. The County assumes no responsibility for
any understanding or representations concerning conditions made by any of its officers o r agents prior to
the execution of this Contract, unless such understandings or representations by the County are expressly
stated in this Contract.
SECTION SEVENTEEN
Cleanup Work: Repair of Damages
During the performance of the Work, the Contractor shall continuously keep County-provided work space
(the "Work Site") and areas adjacent thereto in an orderly condition, free and clear from debris and
discarded materials.
Contractor will restore or replace, when and as directed by the County, any public or private property
damaged or destroyed by Contractor's work, equipment or employees to a condition at least equal to that
existing immediately prior to the beginning of the Work.
Page 77 of 430
7
SECTION EIGHTEEN
Damages
The Contractor expressly agrees that if the Work, or any part thereof, is not performed or completed in a
timely or professional manner in accordance with this Contract or any amendment thereto, the Contractor
and its sureties shall be liable to the County for actual damages that relate to the Contractor's failure to
perform or complete the Work in the manner described above. If actual damages are agreed to by the County
and the Contractor or awarded by the Court, the County shall have the right to deduct f rom and retain out
of monies, which may be then due or which may become due and payable to the Contractor, the amount of
such actual damages; and if the amount so retained by the County is not sufficient to pay in full such actual
damages, the Contractor and/or its sureties shall pay to the County the amount necessary to effect payment
in full of such actual damages.
SECTION NINETEEN
Suspension of Work
The Purchasing Director may order, in writing, the Contractor to suspend, delay, or interrupt all or any part
of the Work for such period of time as he may determine to be appropriate for the convenience of the
County. The County may suspend performance of its obligations under this Contract in good faith for the
convenience of the County or to investigate matters arising in the Work.
The Purchasing Director may order suspension of the Work in whole or in part for such time as he deems
necessary because of the failure of the Contractor to comply with any of the requirements of this Contract,
and the Contract's completion date shall not be extended on account of any such suspension of Work.
When the Purchasing Director orders any suspension of the Work under the paragraph above, the Contractor
shall not be entitled to any payment for Work with respect to the period during which such Work is
suspended and shall not be entitled to any costs or damages resulting from such suspension.
The rights and remedies of the County provided in this Section are in addition to any other rights and
remedies provided by law or under this Contract.
SECTION TWENTY
Modification of Contract
The County's Purchasing Director has the unilateral right to modify this Contract, within the general scope
of work described above and in Exhibit B, when the modification is in the best interest of the County,
provided however, the Contractor is given wri tten notice of any such modification and the County is
responsible for paying Contractor for any additional expenses incurred by the Contractor that relate to the
modification. Subject to the above, the Contractor shall immediately notify the County in wri ting of any
proposed adjustment in its fee and the schedule for performance. The Contractor is obligated to perform
the revised contract when so directed by the Purchasing Director, and the County is obligated to pay for the
work performed pursuant to the modification. No claim by the Contractor for an adjustment hereunder shall
be allowed if asserted after Final Payment under this Contract.
Page 78 of 430
8
SECTION TWENTY-ONE
Termination
1. For Convenience
The Purchasing Director, by advance written notice, may terminate this Contract when it is in the
best interests of the County. If this Contract is so terminated, the Contractor shall be compensated
for all necessary and reasonable direct costs of performing the Work actually accomplished. The
Contractor will not be compensated for any other costs in connection with a termination for
convenience. The Contractor will not be entitled to recover any damages in connection with a
termination for convenience.
2. For Default
If the Contractor refuses or fails to perform the Work or any separable part thereof in a timely or
workmanlike manner in accordance with the Contract Documents, or otherwise fails, in the sole
opinion of the County, to comply with any of the terms and conditions of the Contract Documents
deemed, in the sole opinion of the County, to be material (including, without limitation, the
requirement that Contractor obtain and maintain in force all necessary permits), such refusal or
failure shall be deemed a default under this Contract.
In the event of a default under this Section, the County shall have the right to inform the
Contractor of the default and demand that the Contractor immediately deliver a plan to remedy
the default. If the Contractor does not respond with a timely or reasonably achievable plan, the
County may terminate forthwith this Contract by additional written notice to the Contractor. In
the event of such default, the advance notice period for termination is waived and the Contractor
shall not be entitled to any costs or damages resulting from a termination under this Section.
Whether or not the Contractor's right to proceed with the Work is terminated, it and its sureties
shall be liable for any damage to the County resulting from the Contractor’s default. Any
wrongful termination for default shall be deemed by the Parties a termination for convenience.
3. Termination for Non-Appropriation of Funds
The Purchasing Director, by written advance notice, may terminate this Contract in whole or in
part in the event that sufficient appropriation of funds from any source (whether a federal, state,
County or other source) are not made or sufficient funds are otherwise unavailable, in either case,
to pay the charges under this Contract. If this Contract is so terminated, the Contractor shall be
compensated for all necessary and reasonable direct costs of performing the Work actually
provided to the date of such termination. The Contractor will not be compensated for any other
costs in connection with a termination for non-appropriation. The Contractor will not be entitled
to recover any damages in connection with a termination for non-appropriation, including, but not
limited to, lost profits.
4. Rights Cumulative
The rights and remedies of the County provided in this Section are in addition to any other rights
and remedies provided by law or under this Contract.
Page 79 of 430
9
SECTION TWENTY-TW0
Indemnification
Except for expenses or liabilities arising from the negligence or intentional acts of the County, the
Contractor hereby expressly agrees to indemnify and hold the County harmless against any and all expenses
and liabilities arising out of the negligent or intentionally wrongful performance, action or inaction of the
Contractor in conduct of this Contract, as follows:
For matters other than those arising from the rendering or failure to render professional services, the
Contractor expressly agrees to the extent that there is a causal relationship between its negligence, action
or inaction, or the negligence, action or inaction of any of its employees or any person, firm or corporation
directly or indirectly employed by the Contractor and any damage, liability, injury, loss or expense (whether
in connection with bodily injury or death or property damage) that is suffered by the County and/or its
officers or employees or by any member of the public, to indemnify and save the County and its officers
and employees harmless against any and all liabilities, penalties, demands, claims, lawsuits, losses,
damages, costs, and expenses arising out of the negligence, action or inaction of the Contractor, regardless
of whether such liabilities, penalties, demands, claims, lawsuits, losses, damages, costs and expenses are
caused in part by the County. Such costs are to include, without limitation, defense, settlement and
reasonable attorney's fees incurred by the County and its employees. This promise to indemnify shall
include, without limitation, bodily injuries or death occurring to the Contractor's employees and any person,
directly or indirectly employed by the Contractor (including, without limitation, any employee of any
subcontractor), the County's officers or employees, the employees of any other independent contractors, or
occurring to any member of the public. When the County s ubmits notice, the Contractor shall promptly
defend any aforementioned action.
For matters arising out of the rendering or failure to render professional services, the Contractor will
indemnify and save the County and its officers and employees harmless from and against all liabilities,
penalties, demands, claims, lawsuits, losses, d amages, costs and expenses arising out of or resultant from
any negligent act, error or omission of the Contractor in the rendering or failure to render professional
services under this Contract. Such costs are to include, without limitation, defense, sett lement and
reasonable attorneys' fees incurred by the County and its officers and employees. This promise to indemnify
shall include, without limitation, bodily injuries or death occurring to the Contractor's employees and any
person, directly or indirectly employed by the Contractor (including, without limitation, any employee of
any subcontractor), the County's officers or employees, the employees of any other independent contractors,
or occurring to any member of the public. When the County submits notic e of a claim that triggers the
indemnity, the Contractor shall promptly defend any aforementioned action.
The limits of insurance required in this Contract shall not limit the Contractor's obligations under this
Section. The terms and conditions contained in this Section shall survive the termination of the Contract or
the suspension of the Work hereunder. To the extent that any liabilities, penalties, demands, claims,
lawsuits, losses, damages, costs and expenses are caused in part by the acts of the County, the Contractor’s
obligations shall be reduced in proportion to the County's fault. The obligations herein shall also extend to
any actions by the County to enforce this indemnity obligation. The recovery of costs and fees all extend
to those incurred in the enforcement of this indemnity.
Page 80 of 430
10
SECTION TWENTY-THREE
Gratuities and Kickbacks
Gratuities. It shall be unethical for any person to offer, give or agree to give any employee or former
employee, or for any employee or former employee to solicit, demand, accept, or agree to accept from
another person a gratuity or an offer of employment in connection with any decision, approval, disapproval,
recommendation, preparation or any part of a program requirement or a purchase request, influencing the
content of any specification or procurement standard, rendering of advice, investigation, auditing, or in any
other advisory capacity in any proceeding or application, request for ruling, determination, claim or
controversy, or other particular matter pertaining to any program requirement of a contract or subcontract,
or to any solicitation or proposal therefore.
Kickbacks. It shall be unethical for any payment, gratuity, or offer of employment to be made by or on
behalf of a subcontractor under a contract to the prime contractor, or to hire any subcontractor or any person
associated therewith, as an inducement for the award of a subcontract or order.
Violation of this clause may result in Contract termination.
SECTION TWENTY-FOUR
Labor: Subcontractors
No subcontracts shall be allowed without the prior written approval of the County. The Contractor shall not
contract with a proposed person or entity to whom the County has made reasonable and timely objections.
The Contractor shall not be required to contract with anyone to whom the Contractor has made reasonable
and timely objection.
The Contractor shall enforce strict discipline and good order among its employees and other persons
carrying out the performance of the Contract.
Employment of labor by the Contractor shall be effected under conditions which are satisfactory to the
County. The Contractor shall remove or cause to have removed from the project any employee or employees
who are considered unsatisfactory by the County.
The Contractor assumes the responsibility for assuring that its working forces are compatible with the
County employees and the Contractor is responsible for making itself aware of those forces. The Contractor
will furnish a competent representative who is to be kept available to represent the Contractor for the
purpose of receiving notices, orders and instruction. No substitutions shall be made of such Contractor’s
representative without the approval of the County and a replacement by someone with comparable, skills,
experience and talent.
SECTION TWENTY-FIVE
Assignment
The Contractor shall not assign in whole or in part the Contract without the prior written consent of the
County or its Assignee. The Contractor shall not assign any money due or that may become due to it under
said the Contract without the prior written c onsent of the County or its Assignee. Each Party binds itself,
its successors, assigns, executors, administrators or other representatives to the other Party hereto and to
successors, assigns, executors, administrators or other representatives of such other Party in connection
with all terms and conditions of the Contract.
Page 81 of 430
11
SECTION TWENTY-SIX
Controlling Law
The laws of South Carolina shall govern this Contract. All litigation arising under this Contract shall be
litigated only in a nonjury hearing in the Court of Common Pleas, Fourteenth Judicial Circuit, Beaufort
County, South Carolina.
SECTION TWENTY-SEVEN
Entire Contract
This Contract constitutes the entire understanding and contract between the Parties hereto and supersedes
all prior and contemporaneous written and oral contracts between the Parties and their predecessors in
interest regarding the subject matter of this Contract. This Contract may not be changed, altered, amended,
modified, or terminated orally, except as specifically provided, and any such change, alteration,
amendment, or modification must be in writing and executed by the Parties hereto.
SECTION TWENTY-EIGHT
Severance
Should any part of this Contract be determined by a Court of competent jurisdiction to be invalid, illegal,
or against public policy, said offending Section shall be void and of no effect and shall not render any other
Section herein, nor this Contract as a whole, invalid. Any terms which, by their nature, should survive the
suspension, termination or expiration hereof shall be deemed to so survive.
SECTION TWENTY-NINE
Non-waiver
Any waiver of any default by either Party to this Contract shall not constitute waiver of any subsequent
default, nor shall it operate to require either Party to waive, or entitle either Party to a waiver of, any
subsequent default hereunder.
Page 82 of 430
Page 83 of 430
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
APPROVAL OF A CONTRACT AWARD TO NIX CONSTRUCTION INC. FOR THE DESIGN AND BUILD OF A
PEDESTRIAN WALKWAY AND BRIDGE PROJECT AT THE HILTON HEAD ISLAND AIRPORT ($243,000.00)
MEETING NAME AND DATE:
County Council November 9, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends a contract award to Nix Construction Inc. for the design and build of a Pedestrian Walkway
and Bridge Project at the Hilton Head Island Airport.
PRESENTER INFORMATION:
Jon Rembold, Airports Director, 3 minutes
ITEM BACKGROUND:
Hilton Head Island Airport seeks to connect an additional parking area to the new terminal area. A small
stormwater swale is located between the parking area and the terminal. Therefore, the Airport issued a
design-build RFP to provide design and construction of a pedestrian walkway and "bridge" over the swale to
connect the two facilities.
FISCAL IMPACT:
The South Carolina Aeronautics Commission (SCAC) will fund 100% of the total cost ($243,000.00) of the
Pedestrian Walkway and Bridge Project through an Entitlement Grant.
Funding Source: GL 5402-90-0000-57130
Balance: $10,325,948.44
CONTINGENT UPON FINAL SCAC GRANT APPROVAL (anticipated 11/2026)
APPROVAL HISTORY:
The Airports Board reviewed and recommended approval of the contract award to Nix Construction, Inc. at
the monthly meeting held on October 8.
Page 84 of 430
Beaufort County, SC
Procurement
David Thomas, Director
PO Box 1228, Beaufort, SC 29902
EVALUATION TABULATION
RFP No. 082526
Pedestrian Walkway and Bridge Project at Hilton Head Island Airport
RESPONSE DEADLINE: August 25, 2026 at 3:00 pm
Report Generated: Wednesday, September 2, 2026
VENDOR QUESTIONNAIRE PASS/FAIL
Question Title Astra Group, LLC D Anderson Construction
Company, Inc.
Esposito Commercial
Construction, LLC
NIX CONSTRUCTION Reeves Young, LLC
Proposer confirms the
proposal is firm for a
period of at least 90 days
from the closing date for
submission of proposal.
Pass Pass Pass Pass Pass
Please Provide Licenses
and Certificate of
Insurance.
Pass Pass Pass Pass Pass
Certification regarding
Debarment, Suspension,
Ineligibility, and
Voluntary exclusion
Pass Pass Pass Pass Pass
State whether your
company has been
involved in any litigation
within the past five (5)
years, arising out of your
performance.
Pass Pass Pass Pass Pass
Explain fully any litigation
involving performance.
Pass No Response No Response No Response No Response
Page 85 of 430
EVALUATION TABULATION
RFP No. 082526
Pedestrian Walkway and Bridge Project at Hilton Head Island Airport
EVALUATION TABULATION
Request For Proposal - Pedestrian Walkway and Bridge Project at Hilton Head Island Airport
Page 2
Question Title Astra Group, LLC D Anderson Construction
Company, Inc.
Esposito Commercial
Construction, LLC
NIX CONSTRUCTION Reeves Young, LLC
Non-Segregated Facilities Pass Pass Pass Pass Pass
Please upload any
relevant certifications
and/or licenses
Pass No Response No Response Pass Pass
Proposal Pass Pass Pass Pass Pass
PHASE 1
EVALUATORS
Name Title Agreement Accepted On
Marlene Myers Airports Business Manager Aug 26, 2026 8:20 AM
Charles Neeson Airport Operations Chief Aug 31, 2026 2:43 PM
Stephen Parry Deputy Airports Director Aug 26, 2026 2:49 PM
EVALUATION CRITERIA
Criteria Scoring Method Weight (Points)
Qualifications & Relevant Experience Points Based 35 (35% of Total)
Description:
Evaluation of the proposer's experience designing and constructing pedestrian bridges, walkways, or similar infrastructure pr ojects. Consideration will be given to
the firm's qualifications, experience on comparable projects, references, and demonstrated ability to successfully complete projects o f similar scope and
complexity.
Page 86 of 430
EVALUATION TABULATION
RFP No. 082526
Pedestrian Walkway and Bridge Project at Hilton Head Island Airport
EVALUATION TABULATION
Request For Proposal - Pedestrian Walkway and Bridge Project at Hilton Head Island Airport
Page 3
Criteria Scoring Method Weight (Points)
Project Approach & Technical Proposal Points Based 30 (30% of Total)
Description:
Evaluation of the proposer's understanding of the project, proposed design approach, construction methodology, permitting str ategy, project schedule, and
ability to deliver a durable, safe, ADA-compliant, and low-maintenance pedestrian bridge and walkway.
Criteria Scoring Method Weight (Points)
Project Schedule Points Based 30 (30% of Total)
Description:
Evaluation of the proposed timeline for design, permitting, construction, and project completion, including the proposer's ab ility to complete the work efficiently
while minimizing disruption to airport operations.
Criteria Scoring Method Weight (Points)
Value to the Airport Points Based 5 (5% of Total)
Description:
The airport seeks a solution that provides the overall best value to the airport.
Value includes overall durability, warranty, aesthetics, low-maintenance materials, etc.
AGGREGATE SCORES SUMMARY
Vendor Marlene Myers Charles Neeson Stephen Parry Total Score
(Max Score 100)
NIX CONSTRUCTION 97 89 95 93.67
Page 87 of 430
EVALUATION TABULATION
RFP No. 082526
Pedestrian Walkway and Bridge Project at Hilton Head Island Airport
EVALUATION TABULATION
Request For Proposal - Pedestrian Walkway and Bridge Project at Hilton Head Island Airport
Page 4
Vendor Marlene Myers Charles Neeson Stephen Parry Total Score
(Max Score 100)
Reeves Young, LLC 96 86 92 91.33
D Anderson Construction
Company, Inc.
84 88 89 87
Astra Group, LLC 93 67 88 82.67
Esposito Commercial
Construction, LLC
85 79 81 81.67
VENDOR SCORES BY EVALUATION CRITERIA
Vendor Qualifications & Relevant
Experience
Points Based
35 Points (35%)
Project Approach &
Technical Proposal
Points Based
30 Points (30%)
Project Schedule
Points Based
30 Points (30%)
Value to the Airport
Points Based
5 Points (5%)
Total Score
(Max Score 100)
NIX CONSTRUCTION 33.7 28 27 5 93.67
Reeves Young, LLC 32.3 26.7 28 4.3 91.33
D Anderson Construction
Company, Inc.
29 27 27 4 87
Astra Group, LLC 32.7 23.7 22.7 3.7 82.67
Esposito Commercial
Construction, LLC
29 26.3 22.3 4 81.67
Page 88 of 430
Nix Construction Company, Inc.
2 Corpus Christi, Suite 203
Hilton Head Island, SC 29928
(843) 341-2330
www.NixConstruction.com
Gillian Murray September 25, 2026
Beaufort County Procurement
102 Industrial Village Rd #2
Beaufort, SC
Re: HH Airport Pedestrian Bridge – Pricing & Scheduling Options
Dear Gillian,
Below are the formal pricing and schedule options for our Hilton Head Airport Pedestrian
Bridge design-build proposal submitted last week.
Pricing
Option Phase 1 –
Design
Phase 2 –
Construction Total
Option 1 – Prefabricated Cascade truss
bridge, composite deck and top-chord
cladding, stainless cable rail
$95,000 $218,000 $313,000
Option 2 – Nix site-built timber bridge,
stainless cable rail $95,000 $148,000 $243,000
Phase 1 includes: Civil Engineering (Ward Edwards), Structural Engineering (29e6),
Wetlands/endangered Species Assessments (Newkirk), Geotechnical (Whitaker), Corridor Survey
(Atlas), and Nix Preconstruction Services.
Phase 2 includes: Concrete Abutments, Grading And Asphalt Paving, Erosion Control, Electrical
(Subcontractor And Fixtures), And General Conditions.
Schedule
We recognize the need for this project to complete before the Heritage Golf Tournament begins
in April 2027, however, we are unable to confirm the permitting portion of the schedule until we
are allowed to open clear communication with SC DES for Land Disturbance and Town of
Hilton Head Island for Building Permit requirements. Upon approval, we will immediately seek
direction from both jurisdictions to determine the fastest and most efficient way through this
process.
Scheduling Scenarios (From Notice to Proceed) Phase 1 – Design &
Bldg Permit
Phase 2 –
Construction Total
‘Excluding’ SC DES land-disturbance 14 weeks 5 weeks 19 weeks
‘Including’ SC DES land-disturbance 25 weeks 7 weeks 32 weeks
Page 89 of 430
Nix Construction Company, Inc.
2 Corpus Christi, Suite 203
Hilton Head Island, SC 29928
(843) 341-2330
www.NixConstruction.com
Thank you for allowing us the opportunity to provide this proposal and we look forward to
hearing from you soon.
Sincerely,
Eric Hoover, PE | President
Eric@NixConstruction.com | Cell: 843-505-2455
Page 90 of 430
1
STATE OF SOUTH CAROLINA )
) CONTRACT
COUNTY OF BEAUFORT ) Pedestrian Walkway and Bridge Project at Hilton Head
Island Airport
THIS CONTRACT (hereinafter the "Contract") entered into this 1 st day of October 2026, between the
COUNTY OF BEAUFORT, South Carolina, a public body corporate and politic and political subdivision
of the State of South Carolina, (hereinafter "County") and Nix Construction Company, Inc., (hereinafter
the "Contractor"), ("Party" as to each; collectively the "Parties")
WITNESSETH:
WHEREAS, the County wishes to contract for Pedestrian Walkway and Bridge Project at Hilton Head
Island Airport (the "Work" and/or "Services"); and
WHEREAS, the Contractor has represented to the County that its staff is qualified to provide the Work
required in this Contract in a professional, timely manner; and
WHEREAS, the County has relied upon the above representations by the Contractor;
NOW, THEREFORE, in consideration of these premises and covenants set forth herein, it is agreed by and
between the Parties as follows:
SECTION ONE
Contract Documents
The Parties agree that the Contract Documents shall include the following, which are incorporated herein
by reference:
Exhibit A: Contractor's Scope and Fee dated September 25, 2026 in which the County has
selected option 2.
Exhibit B: Solicitation Number 082526
In the event of any conflict, discrepancy, or inconsistency among any of the documents which make up this
Contract, the following shall control:
As between the Contract and the Contract Documents which make up this Contract, the Contract
shall govern.
In the event of any conflict, discrepancy, or inconsistency among any of the Contract Documents,
the Contractor shall notify the County immediately upon discovery of the same for resolution by the
County.
Any documents not included or expressly contemplated in this Contract do not, and shall not, form
a part of this Contract. The Contract Documents are intended to be complementary, and a
requirement in one document shall be deemed a requirement in all documents.
Page 91 of 430
2
SECTION TWO
Scope of Work
The Contractor agrees to perform and furnish all labor, supervision, materials, equipment, transportation
and supplies necessary for the completion of the Work required under this Contract in a timely and
workmanlike manner, professional in all aspects, and in accord with all applicable laws, rules and
regulations.
The Contractor shall provide the services outlined below in conjunction with the Contractor's Scope and
Fee dated September 25, 2026 marked as Exhibit A, that was previously incorporated by reference. The
Contractor shall commence the Work as specified in the Notice to Proceed, when it is issued, but not before
it is issued. Coordination of the Work and administration of this Contract shall be by Beaufort County.
SECTION THREE
Contract Price: Payment Terms
County agrees to pay for the performance of the Work described in this Contract, including all items
necessary to accomplish and complete the Work, in accordance with all terms and conditions as stated
herein on the following basis:
Contract Amount: Not to Exceed Two Hundred Forty -Three Thousand Dollars and Zero Cents
($243,000.00)
Payments:
Contractor will be paid on a percentage complete basis with the submission of monthly invoices.
Monthly payments will be made based on the percentage of services rendered and any expenses incurred.
Final payment which shall be paid upon Final Acceptance by the County's authorized representative. Final
Acceptance is defined as the County accepting the Work from the Contractor when the County deems the
Work completed in accordance with the terms of the Contract.
Final Payment is defined as the last payment from the County to the Contractor of the entire unpaid balance
of the Contract sum as adjusted by any approved change orders.
Application for payment shall be prepared and submitted electronically. All invoices shall be addressed to
Hilton Head Island Airport, 26 Hunter Rd, Hilton Head, SC 29926.
SECTION FOUR
Time: Term of Contract
The County hereby contracts with Contractor to provide the Work specified herein by April 1, 2027 after
issuance of the Notice to Proceed.
The County reserves the right to extend the term of this Contract, if it is determined to be in its best interest.
Page 92 of 430
3
SECTION FIVE
Insurance Requirements
The Contractor, at its own expense, shall at all times during the term of the Contract, maintain insurance as
included in the solicitation, Insurance Requirements, which is attached hereto and previously incorporated
by reference. The County may contact the Contractor's insurer(s) or insurer(s)' agent(s) directly at any time
regarding the Contractor's coverages, coverage amounts, or other such relevant and reasonable issues
related to this Contract. The Contractor shall also require any subcontractors to carry the same coverages
in the same amounts.
The County must be advised immediately of any changes in required coverages.
SECTION SIX
Compliance with Legal Requirements
All applicable federal, state and local laws, ordinances, and rules and regulations of any authorities
(including, but not limited to, any laws, ordinances or regulations relating to the S.C. Department of
Revenue or the S.C. Board of Contractors) shall be binding upon the Contractor throughout the pendency
of the Work. The Contractor shall be responsible for compliance with any such law, ordinance, rule or
regulation, and shall hold the County harmless and indemnify same in the event of non- compliance as set
forth in the Contract.
The Contractor certifies that it will comply with the applicable requirements of Title 8, Chapter 14 of South
Carolina Code of Laws (1976, as amended) and agrees to provide to the State upon request any
documentation required to establish either: (a) that Title 8, Chapter 14 is inapplicable to the Contractor and
its subcontractors or sub -subcontractors; or (b) that the Contractor and its subcontractors or
subsubcontractors are in compliance with Title 8, Chapter 14.
Pursuant to Section 8- 14-60, "A person who knowingly makes or files any false, fictitious, or fraudulent
document, statement, or report pursuant to this chapter is guilty of a felony and, upon conviction, must be
fined within the discretion of the Court or imprisoned for not more than five years, or both."
The Contractor agrees to include in any contracts with subcontractors, language requiring subcontractors
to (a) comply with applicable requirements of Title 8, Chapter 14, and (b) include in its contracts with the
subcontractors language requiring the sub- subcontractors to comply with the applicable requirements of
Title 8, Chapter 14.
The Contractor agrees to and shall certify agreement to abide by the requirements under Title VI of the
Civil Rights Act of 1964, and other non-discrimination authorities under Federal Executive Order Number
11246, as amended, and specifically the provisions of the equal opportunity clause.
The Contractor shall comply with all federal, state and local laws, ordinances, rules and regulations of any
authorities throughout the duration of this Contract. The Contractor shall be responsible for compliance
with any such law, ordinance, rule or regu lation, and shall hold the County harmless and indemnify same
in the event of non-compliance.
Page 93 of 430
4
SECTION SEVEN
Drug-free Workplace Act
The Contractor shall comply with the South Carolina Drug-free Workplace Act, Section 44-107-10 et seq.,
S.C. Code of Laws (1976, as amended). The County requires all contractors executing contracts for a stated
or estimated value of $50,000 or more to sign a Drug-free Workplace Certification form prior to the issuance
of the Notice to Proceed.
SECTION EIGHT
Contractor's Warranties and Representations
The Contractor represents that its staff is knowledgeable about and experienced in performing the Work
required in this Contract and warrants that it will use best skill and attention to provide above described
Work in a professional, timely manner.
The Contractor warrants and represents that it shall be responsible for all subcontractors working directly
for it, as well as for their work product, as though the Contractor had performed the Work itself.
1. If equipment, materials and supplies are to be a part of the service provided, all equipment,
materials, and supplies incorporated in the Work covered by the bid and provided by the
Contractor are to be new and of the most suitable grade for the purpose intended. Unless
otherwise specifically provided in this Contract, reference to any equipment, material, article or
patented process, by trade name, make or catalog number, shall not be construed as limiting
competition. When requested, the Contractor shall furnish to the Purchasing Director, for
approval the name of the manufacturer, the model number, and other identifying data and
information respecting the performance, capacity, nature and rating of the machinery and
mechanical and other equipment which the Contractor contemplates incorporating in the Work.
When required by this Contract or when called for by the Purchasing Director, the Contractor
shall provide full information concerning the material or articles that he contemplates
incorporating in the Work. When so directed, samples shall be submitted for approval at the
Contractor's expense, with all shipping charges prepaid. Machinery, equipment, material and
articles installed or used without the required prior approval of the County shall be at the risk of
subsequent rejection by the County.
2. Any and all manufacturers' warranties on any equipment or materials will be passed on to the
County and copies of said warranties will be furnished by the Contractor to the County upon
completion and final acceptance of the Work.
3. The Purchasing Director may, in writing, require the Contractor to remove from the Work Site
any employee the Purchasing Director deems incompetent, careless or otherwise objectionable.
4. In addition to any manufacturer's warranties, all labor and materials are warranted to be free from
defects for a period of twelve (12) months after the date of Final Payment by the County.
Page 94 of 430
5
SECTION NINE
Retention of Records
The Contractor agrees to maintain for three (3) years from the date of Final Payment, or until the end of
any audit or closure of all pending matters under this Contract, whichever is later, all books, documents,
papers, and records pertinent to this Contract. The Contractor agrees to provide to the County, any federal
grantor agency, the Comptroller General of the United States, any state grantor agency, any assignee, or
any of their duly authorized representatives access to such books, documents, papers, and records for the
purpose of examining, auditing, and copying them. The Contractor further agrees to include these
provisions in any subcontracts issued in connection with this Contract.
SECTION TEN
State and Local Taxes
Except as otherwise provided, Contract prices shall include all applicable state and local taxes.
The Contractor shall calculate that portion of the Contract that is subject to the South Carolina sales and/or
use tax, and this amount shall be itemized and shown on all invoices and shall be paid to the SCDOR by
Contractor. If Contractor is a non-South Carolina Company, the County will withhold said amount from all
invoices and remit payment to the SCDOR, unless the Contractor furnishes the County with a valid South
Carolina Use Tax Registration Certificate Number.
The Contractor shall indemnify and hold harmless the County for any loss, cost, or expense incurred by,
levied upon or billed to the County as a result of the Contractor's failure to pay any tax of any type due in
connection with this Contract.
The Contractor shall ensure that the above sections are included in all subcontracts and sub- subcontracts
and shall ensure withholding on out of state sub and sub-subcontractors to which withholding is applicable.
SECTION ELEVEN
Independent Contractor
The Contractor is an independent contractor and shall not be deemed the agent or employee of the County
for any purpose whatsoever. Contractor shall not hold himself out as an employee of the County and shall
have no power or authority to bind or obligate the County in any manner, except the County shall make
payment to the Contractor for work and expenses as herein provided. The Contractor shall obtain and
maintain all licenses and permits required by law for performance of this Contract by him or his employees,
agents, and servants. The Contractor shall be liable for and pay all taxes required by local, state or federal
governments, including but not limited to social security, Workers' Compensation, employment security,
and any other taxes and licenses or insurance premiums required by law. No employee benefits of any kind
shall be paid by the County to or for the benefit of the Contractor or its employees, agents, or servants by
reason of this Contract.
SECTION TWELVE
Other Contracts
The County reserves the right to undertake or award other contracts for additional work/services, and may
elect to complete portions of the Work/Services included in this Contract using its own forces or through
other contracts, and the Contractor shall fully cooperate with such other contractors, County employees and
Page 95 of 430
6
carefully fit its own work/services to such work/services as may be directed by the County. The Contractor
shall not commit or permit any act by its forces or subcontractors which will interfere with the performance
of work/services by any other contractor or by County and or Department employees
SECTION THIRTEEN
Permits and Licenses
The Contractor shall, without additional expense to the County, be responsible for obtaining and
maintaining all necessary licenses and permits required by the State of South Carolina, a municipality or
the County or any other authority having jurisdiction. Prior to execution of a contract, the Contractor may
be required to provide a copy of its current applicable Contractor's License issued by the State of South
Carolina and business license issued by the County. Contractor's (and or any subcontractor's) L icense
Number, Person's Name and Business Name must all be shown on all required licenses.
SECTION FOURTEEN
Safety, Health, and Security Precautions
The Contractor shall take proper safety, health and security precautions to protect its workers and the
County's property, workers and the public at all times during the term of this Contract. All materials shall
be stored securely, protected from theft or damage.
SECTION FIFTEEN
Inspection and Acceptance
All Work shall be subject to inspection and testing by the County at all reasonable times and places. The
Contractor shall, without charge, correct any workmanship found by the County not to conform to the
Contract requirements.
SECTION SIXTEEN
Conditions Affecting the Work
The Contractor shall be responsible for having taken steps reasonably necessary to ascertain the nature and
location of the Work, and the general and local conditions that can affect the Work or the cost thereof. Any
failure by the Contractor to do so will not relieve the Contractor from responsibility for successfully
performing the Work without additional expense to the County. The County assumes no responsibility for
any understanding or representations concerning conditions made by any of its officers o r agents prior to
the execution of this Contract, unless such understandings or representations by the County are expressly
stated in this Contract.
SECTION SEVENTEEN
Cleanup Work: Repair of Damages
During the performance of the Work, the Contractor shall continuously keep County-provided work space
(the "Work Site") and areas adjacent thereto in an orderly condition, free and clear from debris and
discarded materials.
Contractor will restore or replace, when and as directed by the County, any public or private property
damaged or destroyed by Contractor's work, equipment or employees to a condition at least equal to that
existing immediately prior to the beginning of the Work.
Page 96 of 430
7
SECTION EIGHTEEN
Damages
The Contractor expressly agrees that if the Work, or any part thereof, is not performed or completed in a
timely or professional manner in accordance with this Contract or any amendment thereto, the Contractor
and its sureties shall be liable to the County for actual damages that relate to the Contractor's failure to
perform or complete the Work in the manner described above. If actual damages are agreed to by the County
and the Contractor or awarded by the Court, the County shall have the right to deduct f rom and retain out
of monies, which may be then due or which may become due and payable to the Contractor, the amount of
such actual damages; and if the amount so retained by the County is not sufficient to pay in full such actual
damages, the Contractor and/or its sureties shall pay to the County the amount necessary to effect payment
in full of such actual damages.
SECTION NINETEEN
Suspension of Work
The Purchasing Director may order, in writing, the Contractor to suspend, delay, or interrupt all or any part
of the Work for such period of time as he may determine to be appropriate for the convenience of the
County. The County may suspend performance of its obligations under this Contract in good faith for the
convenience of the County or to investigate matters arising in the Work.
The Purchasing Director may order suspension of the Work in whole or in part for such time as he deems
necessary because of the failure of the Contractor to comply with any of the requirements of this Contract,
and the Contract's completion date shall not be extended on account of any such suspension of Work.
When the Purchasing Director orders any suspension of the Work under the paragraph above, the Contractor
shall not be entitled to any payment for Work with respect to the period during which such Work is
suspended and shall not be entitled to any costs or damages resulting from such suspension.
The rights and remedies of the County provided in this Section are in addition to any other rights and
remedies provided by law or under this Contract.
SECTION TWENTY
Modification of Contract
The County's Purchasing Director has the unilateral right to modify this Contract, within the general scope
of work described above and in Exhibit B, when the modification is in the best interest of the County,
provided however, the Contractor is given wri tten notice of any such modification and the County is
responsible for paying Contractor for any additional expenses incurred by the Contractor that relate to the
modification. Subject to the above, the Contractor shall immediately notify the County in wri ting of any
proposed adjustment in its fee and the schedule for performance. The Contractor is obligated to perform
the revised contract when so directed by the Purchasing Director, and the County is obligated to pay for the
work performed pursuant to the modification. No claim by the Contractor for an adjustment hereunder shall
be allowed if asserted after Final Payment under this Contract.
Page 97 of 430
8
SECTION TWENTY-ONE
Termination
1. For Convenience
The Purchasing Director, by advance written notice, may terminate this Contract when it is in the
best interests of the County. If this Contract is so terminated, the Contractor shall be compensated
for all necessary and reasonable direct costs of performing the Work actually accomplished. The
Contractor will not be compensated for any other costs in connection with a termination for
convenience. The Contractor will not be entitled to recover any damages in connection with a
termination for convenience.
2. For Default
If the Contractor refuses or fails to perform the Work or any separable part thereof in a timely or
workmanlike manner in accordance with the Contract Documents, or otherwise fails, in the sole
opinion of the County, to comply with any of the terms and conditions of the Contract Documents
deemed, in the sole opinion of the County, to be material (including, without limitation, the
requirement that Contractor obtain and maintain in force all necessary permits), such refusal or
failure shall be deemed a default under this Contract.
In the event of a default under this Section, the County shall have the right to inform the
Contractor of the default and demand that the Contractor immediately deliver a plan to remedy
the default. If the Contractor does not respond with a timely or reasonably achievable plan, the
County may terminate forthwith this Contract by additional written notice to the Contractor. In
the event of such default, the advance notice period for termination is waived and the Contractor
shall not be entitled to any costs or damages resulting from a termination under this Section.
Whether or not the Contractor's right to proceed with the Work is terminated, it and its sureties
shall be liable for any damage to the County resulting from the Contractor’s default. Any
wrongful termination for default shall be deemed by the Parties a termination for convenience.
3. Termination for Non-Appropriation of Funds
The Purchasing Director, by written advance notice, may terminate this Contract in whole or in
part in the event that sufficient appropriation of funds from any source (whether a federal, state,
County or other source) are not made or sufficient funds are otherwise unavailable, in either case,
to pay the charges under this Contract. If this Contract is so terminated, the Contractor shall be
compensated for all necessary and reasonable direct costs of performing the Work actually
provided to the date of such termination. The Contractor will not be compensated for any other
costs in connection with a termination for non-appropriation. The Contractor will not be entitled
to recover any damages in connection with a termination for non-appropriation, including, but not
limited to, lost profits.
4. Rights Cumulative
The rights and remedies of the County provided in this Section are in addition to any other rights
and remedies provided by law or under this Contract.
Page 98 of 430
9
SECTION TWENTY-TWO
Indemnification
Except for expenses or liabilities arising from the negligence or intentional acts of the County, the
Contractor hereby expressly agrees to indemnify and hold the County harmless against any and all expenses
and liabilities arising out of the negligent or intentionally wrongful performance, action or inaction of the
Contractor in conduct of this Contract, as follows:
For matters other than those arising from the rendering or failure to render professional services, the
Contractor expressly agrees to the extent that there is a causal relationship between its negligence, action
or inaction, or the negligence, action or inaction of any of its employees or any person, firm or corporation
directly or indirectly employed by the Contractor and any damage, liability, injury, loss or expense (whether
in connection with bodily injury or death or property damage) that is suffered by the County and/or its
officers or employees or by any member of the public, to indemnify and save the County and its officers
and employees harmless against any and all liabilities, penalties, demands, claims, lawsuits, losses,
damages, costs, and expenses arising out of the negligence, action or inaction of the Contractor, regardless
of whether such liabilities, penalties, demands, claims, lawsuits, losses, damages, costs and expenses are
caused in part by the County. Such costs are to include, without limitation, defense, settlement and
reasonable attorney's fees incurred by the County and its employees. This promise to indemnify shall
include, without limitation, bodily injuries or death occurring to the Contractor's employees and any person,
directly or indirectly employed by the Contractor (including, without limitation, any employee of any
subcontractor), the County's officers or employees, the employees of any other independent contractors, or
occurring to any member of the public. When the County submits notice, the Contractor shall promptly
defend any aforementioned action.
For matters arising out of the rendering or failure to render professional services, the Contractor will
indemnify and save the County and its officers and employees harmless from and against all liabilities,
penalties, demands, claims, lawsuits, losses, d amages, costs and expenses arising out of or resultant from
any negligent act, error or omission of the Contractor in the rendering or failure to render professional
services under this Contract. Such costs are to include, without limitation, defense, sett lement and
reasonable attorneys' fees incurred by the County and its officers and employees. This promise to indemnify
shall include, without limitation, bodily injuries or death occurring to the Contractor's employees and any
person, directly or indirectly employed by the Contractor (including, without limitation, any employee of
any subcontractor), the County's officers or employees, the employees of any other independent contractors,
or occurring to any member of the public. When the County submits notic e of a claim that triggers the
indemnity, the Contractor shall promptly defend any aforementioned action.
The limits of insurance required in this Contract shall not limit the Contractor's obligations under this
Section. The terms and conditions contained in this Section shall survive the termination of the Contract or
the suspension of the Work hereunder. To the extent that any liabilities, penalties, demands, claims,
lawsuits, losses, damages, costs and expenses are caused in part by the acts of the County, the Contractor’s
obligations shall be reduced in proportion to the County's fault. The obligations herein shall also extend to
any actions by the County to enforce this indemnity obligation. The recovery of costs and fees all extend
to those incurred in the enforcement of this indemnity.
Page 99 of 430
10
SECTION TWENTY-THREE
Gratuities and Kickbacks
Gratuities. It shall be unethical for any person to offer, give or agree to give any employee or former
employee, or for any employee or former employee to solicit, demand, accept, or agree to accept from
another person a gratuity or an offer of employment in connection with any decision, approval, disapproval,
recommendation, preparation or any part of a program requirement or a purchase request, influencing the
content of any specification or procurement standard, rendering of advice, investigation, auditing, or in any
other advisory capacity in any proceeding or application, request for ruling, determination, claim or
controversy, or other particular matter pertaining to any program requirement of a contract or subcontract,
or to any solicitation or proposal therefore.
Kickbacks. It shall be unethical for any payment, gratuity, or offer of employment to be made by or on
behalf of a subcontractor under a contract to the prime contractor, or to hire any subcontractor or any person
associated therewith, as an inducement for the award of a subcontract or order.
Violation of this clause may result in Contract termination.
SECTION TWENTY-FOUR
Labor: Subcontractors
No subcontracts shall be allowed without the prior written approval of the County. The Contractor shall not
contract with a proposed person or entity to whom the County has made reasonable and timely objections.
The Contractor shall not be required to contract with anyone to whom the Contractor has made reasonable
and timely objection.
The Contractor shall enforce strict discipline and good order among its employees and other persons
carrying out the performance of the Contract.
Employment of labor by the Contractor shall be effected under conditions which are satisfactory to the
County. The Contractor shall remove or cause to have removed from the project any employee or employees
who are considered unsatisfactory by the County.
The Contractor assumes the responsibility for assuring that its working forces are compatible with the
County employees and the Contractor is responsible for making itself aware of those forces. The Contractor
will furnish a competent representative who is to be kept available to represent the Contractor for the
purpose of receiving notices, orders and instruction. No substitutions shall be made of such Contractor’s
representative without the approval of the County and a replacement by someone with comparable, skills,
experience and talent.
SECTION TWENTY-FIVE
Assignment
The Contractor shall not assign in whole or in part the Contract without the prior written consent of the
County or its Assignee. The Contractor shall not assign any money due or that may become due to it under
said the Contract without the prior written c onsent of the County or its Assignee. Each Party binds itself,
its successors, assigns, executors, administrators or other representatives to the other Party hereto and to
successors, assigns, executors, administrators or other representatives of such other Party in connection
with all terms and conditions of the Contract.
Page 100 of 430
11
SECTION TWENTY-SIX
Controlling Law
The laws of South Carolina shall govern this Contract. All litigation arising under this Contract shall be
litigated only in a nonjury hearing in the Court of Common Pleas, Fourteenth Judicial Circuit, Beaufort
County, South Carolina.
SECTION TWENTY-SEVEN
Entire Contract
This Contract constitutes the entire understanding and contract between the Parties hereto and supersedes
all prior and contemporaneous written and oral contracts between the Parties and their predecessors in
interest regarding the subject matter of this Contract. This Contract may not be changed, altered, amended,
modified, or terminated orally, except as specifically provided, and any such change, alteration,
amendment, or modification must be in writing and executed by the Parties hereto.
SECTION TWENTY-EIGHT
Severance
Should any part of this Contract be determined by a Court of competent jurisdiction to be invalid, illegal,
or against public policy, said offending Section shall be void and of no effect and shall not render any other
Section herein, nor this Contract as a whole, invalid. Any terms which, by their nature, should survive the
suspension, termination or expiration hereof shall be deemed to so survive.
SECTION TWENTY-NINE
Non-waiver
Any waiver of any default by either Party to this Contract shall not constitute waiver of any subsequent
default, nor shall it operate to require either Party to waive, or entitle either Party to a waiver of, any
subsequent default hereunder.
Page 101 of 430
Page 102 of 430
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
APPROVAL OF CHANGE ORDERS 1 AND 2 FOR BEAUFORT EXECUTIVE AIRPORT HANGAR CONSTRUCTION
PROJECT - SITE DEVELOPMENT ($288,393.61)
MEETING NAME AND DATE:
County Council November 9, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of Change Orders 1 and 2 for Beaufort Executive Airport Hangar Construction
Project (Site Development).
PRESENTER INFORMATION:
Jon Rembold, Airports Director, 3 minutes
ITEM BACKGROUND:
The Beaufort Executive Airport Hangar Civil Construction project was awarded to Gulf Stream Construction
Co., Inc. for $1,982,494.99. During construction, two additional needs were identified. Change Order No. 1, in
the amount of $153,664.84, addresses design revisions and associated construction impacts identified through
Revision 6. Change Order No. 2, in the amount of $134,728.77, addresses unforeseen roadway subgrade
conditions requiring excavation, undercutting, stabilization, aggregate placement, and related roadway
improvements. Both change orders are necessary to complete the project and remain within the overall
project scope.
FISCAL IMPACT:
The total value of Change Orders No. 1 and No. 2 is $288,393.61, increasing the contract amount from
$1,982,494.99 to $2,270,888.60.
The change orders will be charged to airport funds under the following account:
GL Code: 5102-90-0000-57130 | SCAC Grant - Current Balance: $1,157,357.73
GL Code: 5100-90-0000-54100 | ARPA Grant - Current Balance: $1,019,233.48
APPROVAL HISTORY:
The Airports Board reviewed and recommended approval of Change Orders 1 and 2 at its monthly meeting
held on October 8, 2026.
Page 103 of 430
COUNTY COUNCIL OF BEAUFORT COUNTYPURCHASING DEPARTMENT
106 Industrial Village Road
Post Office Drawer 1228
Beaufort, South Carolina 29901-1228
BEAUFORT COUNTY DEPARTMENT
CHANGE ORDER REQUEST
Date
Aug 7, 2026 10:09 AM
Designated Staff
Milbrandt, Elena
Designated Staff Title
Airports Senior Accountant
Department
Airports
Vendor Name
Gulf Stream Construction Co., Inc
Vendor #
2810
Project Name
Beaufort Executive Airport Hangar – Civil Construction
Change Description
Approval is requested to add Change Order No. 1 in the amount of $153,664.84 to the existing construction contract and FY27 Purchase Order. The change order incorporates design revisions and associated construction impacts identified through Revision 6 that are necessary to complete the Beaufort Executive Airport Hangar Civil Construction project. The additional work is within the overall project scope and extends the contract by 107 calendar days.
Was there an approved contingency?
Yes
No
Account Number
5100-90-0000-54100
Org/Object Code(s)
Contract Name/Purchase Order #
20270298
https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x0100239D5028CE26554DBAF9485379026BFD007F49CDAD0D2E9E41AE263F6FD191436… 1/3
Page 104 of 430
Amounts:
Original Contract/PO Amount
$1,982,494.99
Total Previous Contract/PO Changes
$0.00
Total Prior to Current Change Order
$1,982,494.99
Current Change Order Amount
$153,664.84
Revised Contract/PO to Date
$2,136,159.83
TO WHOM IT MAY CONCERN:
This CHANGE ORDER includes items ordered or changes to services. If this is for construction or renovation
projects. See the additional notes from the requesting department. All Material, labor and equipment
necessary may be added to complete the following work and to adjust the total contract/PO as indicated; see
attached detail. Contract/PO delivery date or project completion date will also extend by:
Days Extended
107
Upload Backup Documentation
Signed Change Order 01.pdf
Approvals:
Approval needed by County Council?
For changes over 10% of budget, select Yes.
Yes No
Department Head Approval
9/28/26, 12:19 PM Nintex Forms for SharePoint Lists
https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x0100239D5028CE26554DBAF9485379026BFD007F49CDAD0D2E9E41AE263F6FD191436… 2/3
Page 105 of 430
Department Head Approval
Approved Not
Approved
Department Head
Rembold, Jon
Signature Date
Aug 7, 2026
Finance Approval
Finance Approval
Approved Not Approved
Finance Approver
Spiess, Courtney
Signature Date
Aug 10, 2026
Purchasing Director Approval
Purchasing Director Approval
Approved Not Approved
Purchasing Director
Thomas, Dave
Signature Date
Aug 10, 2026
Reason Not Approved by Purchasing Director*
Needs CC approval.
9/28/26, 12:19 PM Nintex Forms for SharePoint Lists
https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x0100239D5028CE26554DBAF9485379026BFD007F49CDAD0D2E9E41AE263F6FD191436… 3/3
Page 106 of 430
COUNTY COUNCIL OF BEAUFORT COUNTYPURCHASING DEPARTMENT
106 Industrial Village Road
Post Office Drawer 1228
Beaufort, South Carolina 29901-1228
BEAUFORT COUNTY DEPARTMENT
CHANGE ORDER REQUEST
Date
Aug 7, 2026 10:29 AM
Designated Staff
Milbrandt, Elena
Designated Staff Title
Airports Senior Accountant
Department
Airports
Vendor Name
Gulf Stream Construction Co., Inc.
Vendor #
2810
Project Name
Beaufort Executive Airport Hangar – Civil Construction
Change Description
Approval is requested to amend the existing construction contract and FY27 Purchase Order #20270298 by incorporating Change Order No. 2 in the amount of $134,728.77. This change order addresses unforeseen roadway subgrade conditions that required excavation and undercutting, aggregate placement, stabilization geotextile, embankment placement, and associated roadway improvements necessary to complete the Beaufort Executive Airport Hangar Civil Construction project. The additional work is within the original project scope and extends the contract by 21 calendar days.
Was there an approved contingency?
Yes
No
Account Number
5100-90-0000-54100
Org/Object Code(s)
Contract Name/Purchase Order #
20270298
https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x0100239D5028CE26554DBAF9485379026BFD007F49CDAD0D2E9E41AE263F6FD191436… 1/3
Page 107 of 430
Amounts:
Original Contract/PO Amount
$1,982,494.99
Total Previous Contract/PO Changes
$153,664.84
Total Prior to Current Change Order
$2,136,159.83
Current Change Order Amount
$134,728.77
Revised Contract/PO to Date
$2,270,888.60
TO WHOM IT MAY CONCERN:
This CHANGE ORDER includes items ordered or changes to services. If this is for construction or renovation
projects. See the additional notes from the requesting department. All Material, labor and equipment
necessary may be added to complete the following work and to adjust the total contract/PO as indicated; see
attached detail. Contract/PO delivery date or project completion date will also extend by:
Days Extended
21
Upload Backup Documentation
G701-2017_Form_2026-07-16 18_06_00 UTC.pdf
Approvals:
Approval needed by County Council?
For changes over 10% of budget, select Yes.
Yes No
Department Head Approval
9/28/26, 12:20 PM Nintex Forms for SharePoint Lists
https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x0100239D5028CE26554DBAF9485379026BFD007F49CDAD0D2E9E41AE263F6FD191436… 2/3
Page 108 of 430
Department Head Approval
Approved Not
Approved
Department Head
Rembold, Jon
Signature Date
Aug 7, 2026
Finance Approval
Finance Approval
Approved Not Approved
Finance Approver
Spiess, Courtney
Signature Date
Aug 10, 2026
Purchasing Director Approval
Purchasing Director Approval
Approved Not Approved
Purchasing Director
Thomas, Dave
Signature Date
Aug 10, 2026
Reason Not Approved by Purchasing Director*
Needs CC approval due to the cost going over the contingency amount.
9/28/26, 12:20 PM Nintex Forms for SharePoint Lists
https://wus-srv-ufo.nintexo365.net/runtime/aad?ctype=0x0100239D5028CE26554DBAF9485379026BFD007F49CDAD0D2E9E41AE263F6FD191436… 3/3
Page 109 of 430
Document G701
®
– 2017
Change Order
AIA Document G701 – 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017. All rights reserved. “The American Institute of Architects,”“American Institute of
Architects,”“AIA,”the AIA Logo, and “AIA Contract Documents”are trademarks of The American Institute of Architects. This document was produced at 18:02:15
EDT on 06/16/2026 under Subscription No.20250120239 which expires on 04/16/2027, is not for resale, is licensed for one-time use only, and may only be used
in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69ce50747651406e1f453d7e)
1
PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION:
251770 Beaufort Airport Hangar Contract For: Site Work Construction Change Order Number: 001
237 Sea Island Pkwy
Beaufort, South Carolina 29907
Date: 04-02-2026 Date: June 16, 2026
OWNER: (Name and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address)
County of Beaufort Davis & Floyd Gulf Stream Construction Co., Inc.
PO Box 1228
Beaufort, South Carolina 29901
1983 Technology Drive
Charleston, South Carolina 29492
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon
adjustments attributable to executed Construction Change Directives.)
CO01 Design Changes and Impacts through REV. 6
The original Contract Sum was $ 1,982,494.99
The net change by previously authorized Change Orders $ 0.00
The Contract Sum prior to this Change Order was $ 1,982,494.99
The Contract Sum will be increased by this Change Order in the amount of $ 153,664.84
The new Contract Sum including this Change Order will be $ 2,136,159.83
The Contract Time will be increased by One Hundred Seven (107) days.
The new date of Substantial Completion will be August 14, 2026
NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time,
that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
/s1/
ARCHITECT (Signature)
BY: Elizabeth Sanders
(Printed name, title, and license
number if required)
/d1/
Date
/s2/
CONTRACTOR (Signature)
BY: Travis Park, Senior Project
Manager
(Printed name and title)
/d2/
Date
/s3/
OWNER (Signature)
BY: Stephen Parry, Deputy Airports
Director
(Printed name and title)
/d3/
Date
Docusign Envelope ID: 090C675A-B352-86FB-80C0-86F678F1D550
6/18/2026 | 4:32 AM PDT
6/18/2026 | 9:15 AM PDT
6/18/2026 | 12:27 PM PDT
Page 110 of 430
Document G701
®
– 2017
Change Order
AIA Document G701 – 2017. Copyright © 1979, 1987, 2000 , 2001 and 2017. All rights reserved. “The American Institute of Architects,”“American Institute of
Architects,”“AIA,”the AIA Logo, and “AIA Contract Documents”are trademarks of The American Institute of Architects. This document was produced at 18:04:47
EDT on 07/16/2026 under Subscription No.20250120239 which expires on 04/16/2027, is not for resale, is licensed for one-time use only, and may only be used
in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (69ce50747651406e1f453d7e)
1
PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION:
251770 Beaufort Airport Hangar Contract For: Site Work Construction Change Order Number: 002
237 Sea Island Pkwy
Beaufort, South Carolina 29907
Date: November 07, 2024 Date: July 16, 2026
OWNER: (Name and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address)
County of Beaufort Davis & Floyd Gulf Stream Construction Co., Inc.
PO Box 1228
Beaufort, South Carolina 29901
1983 Technology Drive
Charleston, South Carolina 29492
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon
adjustments attributable to executed Construction Change Directives.)
CO02 - Roadway Unsuitables
Excavate & Undercut
57 Stone
Stabilization Geotextile
Place Embankment
Alt 1
The original Contract Sum was $ 1,982,494.99
The net change by previously authorized Change Orders $ 153,664.84
The Contract Sum prior to this Change Order was $ 2,136,159.83
The Contract Sum will be increased by this Change Order in the amount of $ 134,728.77
The new Contract Sum including this Change Order will be $ 2,270,888.60
The Contract Time will be increased by Twenty-One (21) days.
The new date of Substantial Completion will be September 04, 2026
NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time,
that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
/s1/
ARCHITECT (Signature)
BY: Elizabeth Sanders
(Printed name, title, and license
number if required)
/d1/
Date
/s2/
CONTRACTOR (Signature)
BY: Travis Park, Senior Project
Manager
(Printed name and title)
/d2/
Date
/s3/
OWNER (Signature)
BY: Stephen Parry, Deputy Airports
Director
(Printed name and title)
/d3/
Date
Docusign Envelope ID: D4B76453-1C63-8BBC-832B-37A0EE41098C
7/16/2026 | 1:02 PM PDT
7/17/2026 | 12:38 PM PDT
7/17/2026 | 12:42 PM PDT
Page 111 of 430
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
APPROVAL OF TASK ORDER TO MCSWEENEY DESIGN FOR THE MELROSE FERRY DOCK REPLACEMENT DESIGN
($946,962.50)
MEETING NAME AND DATE:
County Council November 9, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of the task order for McSweeney Engineers in the amount of $946,962.50 and
referal to Council for approval.
PRESENTER INFORMATION:
Bryan Bauer, P.E., ENV SP, Director (5 minutes)
ITEM BACKGROUND:
The Melrose Ferry Dock on Daufuskie Island is outdated and has just undergone a major rehabilitation to keep
it safe for the public. McSweeney Engineers designed the rehabilitation work and have inspected the
structure many times over the years, finding many severe deficiencies which have been addressed in the short
term. The long term solution to this aging structure is a total facility replacement. McSweeney Engineers have
presented a concept proposal for a replacement Ferry Dock facility. McSweeney Engineers are the engineers
of record for the inspections and rehabilitation design and construction of the current structure and have
submitted a reasonable scope and fee for the design of a new facility in the amount of $860,875.00.
FISCAL IMPACT:
The contract amount will be $860,875.00 to McSweeney Engineers. Staff recommends a 10% contingency for
a total budget request of $946,962.50 to come from account # 2002-10-0000-54500-CIP which has a current
amount of $1,432,085.00, and account 4000-80-1243-54500-27007 which has an amount of $150,000.
APPROVAL HISTORY:
Page 112 of 430
300 West Coleman Blvd, Suite 203B
Mt. Pleasant, SC 29464
www.mcsweeneyengineers.com
September 24, 2026
Mr. Bryan Bauer
Director of Engineering
Engineering - Beaufort County
104 Industrial Village Rd, Building 3
Beaufort, SC 29906
Re: Scope and Fee Proposal for Professional Services
Melrose Ferry Terminal Replacement Project
Daufuskie Island, Beaufort County, South Carolina
Dear Mr. Bauer:
McSweeney Engineers LLC appreciates the opportunity to submit this scope and fee proposal for the Melr ose
Ferry Terminal Replacement Project on Daufuskie Isl and in Beaufort County, South Carolina. This propos al
outlines the professional services needed to suppor t the project from initial surveying and design thr ough
permitting, bidding support, construction administration, and construction engineering and inspection.
Project Team
The project team will be led by McSweeney Engineers and supported by our on-call partners, JMT, Davis & Floyd,
and FME. Montgomery Architecture will provide support for building-related components, and Dalon Engineering
will provide mechanical, electrical, and plumbing engineering services.
Scope and Fee Basis
Our team proposes to perform the services described in Attachment A: Scope of Services. The proposed f ee is
organized by task, with the detailed breakdown provided in Attachment B: Cost Breakdown. We have provided
the cost in two formats. One format is the cost br eakdown by engineering tasks for the entire project . The
second format has the approximate cost breakdown between the land-based and water-based components.
Civil-site engineering and permitting services are proposed as lump-sum fees. Bidding, construction
administration, construction engineering and inspection, and reimbursable expenses will be provided on a cost-
plus basis because the final construction phasing, duration, and level of support required have not yet been fully
defined. We recommend budgeting for construction-re lated consultant services as the full scope of work is
developed.
Design Criteria and Public Involvement
Based on our ongoing marine work with Beaufort County, we understand the County’s priorities for this project
include public involvement, green building practice s for vertical structures, and use of the ENVISION project
development framework to support silver-level certi fication for the civil-site design. These criteria are included
in the scope of services and fees.
Public input will be gathered through an on-site st akeholder meeting with the Daufuskie community and other
ferry users. We also anticipate coordinating with B eaufort County to post the conceptual design on the County
website so the public can review the concept and submit online comments.
We further anticipate presenting the conceptual des ign to Beaufort County staff, the Beaufort County P ublic
Facilities Committee, and County Council. This prop osal also assumes the restroom facility can be serv ed by
Page 113 of 430
300 West Coleman Blvd, Suite 203B
Mt. Pleasant, SC 29464
www.mcsweeneyengineers.com
existing water and sewer lines located on, or immediately adjacent to, the project site.
McSweeney Engineers appreciates your consideration of this proposal. If you have any questions or woul d like to
discuss the scope or fee in greater detail, please feel free to contact me.
Very truly yours,
William Barna, P .E.
Page 114 of 430
ATTACHMENT A – SCOPE OF SERVICES
Summary of Scope
The McSweeney Engineers, LLC Team will provide comp rehensive engineering services for the Melrose
Ferry Terminal Facility Replacement Project, includ ing surveying, land planning, civil-site engineerin g,
permitting, waterfront structural engineering, and construction phase services. Waterside work will in clude
demolition and replacement of the existing pier, pi er head, and floating dock assemblies. Landside wor k will
include site redevelopment, parking improvements, l ighting, sidewalk improvements, necessary upgrades or
expansion of the parking lot, stormwater improvemen ts, and water and sewer service to the new ferry te rminal
building.
The civil-site design will incorporate the ENVISION project development framework at a level intended to
support Silver certification. The tasks below descr ibe the services our team will provide to design an d permit
the Melrose Ferry Terminal Facility improvements.
Project Assumptions & Exclusions
This Scope of Services is based upon the following assumptions and exclusions:
1. The new terminal building will be approximately 50’ X 20’ and will include restrooms.
2. Public water and sewer lines exist on or immediatel y adjacent to the site, and no offsite water or
sewer line extensions are required to provide service to the terminal building.
3. Water flow and pressure are sufficient to provide a ny required fire protection lines without adding to
or enhancing the water system with storage tanks, b ooster pumps, or other flow/pressure
improvements.
4. Adequate water and sewer capacity exist to serve th e new ferry terminal building.
5. The site design will address sustainability and res iliency by incorporating the ENVISION framework at
a level intended to support Silver certification. T his scope of services does not include submitting a n
application for ENVISION Silver certification. The scope does include completing the ENVISION
Points Table to identify credits incorporated into the site plan, infrastructure design, and construct ion
phase that total sufficient points to support Silve r certification. The scope also includes completing
one ISI ENVISION Credit Cover Sheet for one credit incorporated into the site design to serve as an
example for any future pursuit of ENVISION certific ation for the Melrose Ferry Terminal Facility. The
pursuit of ENVISION certification is an additional service.
6. Contract time: 20 months for design, permitting, an d construction management. Assuming 12 to 14
months for public engagement, surveying, designing, and permitting, and 6 months for construction.
7. The final layout of the waterfront facilities is de pendent on comments and approvals from the
governing regulatory agencies.
Task “A” – Pre-Design Land and Bathymetric Survey (Lump Sum)
1. Prepare an as-built, boundary, critical line, fresh water wetlands, bathymetric, topographic, and tree
survey of the existing Melrose Ferry Terminal site to include:
a. Existing ferry dock and bathymetric survey of the a djacent tidal waters.
b. Existing access driveway/road and parking lot.
c. Existing electrical lines and any other existing dr y utilities.
Page 115 of 430
d. Existing terminal structure, water, and sewer servi ces. This scope of services assumes there
are existing water and sewer lines on or immediately adjacent to the ferry terminal site.
e. Existing drainage ditches and other drainage featur es that are on and/or immediately
adjacent to the site.
f. The undisturbed and/or forested portions of the site.
2. Delineate and survey the critical line and freshwat er wetlands and submit the survey to SC Bureau of
Coastal Management (BCM) and the US Army Corps of E ngineers (USACE) for jurisdictional
determination.
3. The survey data shall be in the SC State Plane Coor dinate System NAD 83 with the vertical datum
referenced to NAVD 88.
Task “B” – Coastal Hazards and Resilience Evaluation (Lump Sum)
1. Tidal Datum Analysis: Review available NOAA wate r level records and tidal benchmark information
and establish relevant tidal datums and their relat ionship to the project vertical datum for use in
planning and design.
2. Extreme Water Level Evaluation: Compile and eval uate measured and published extreme water
levels applicable to the project site and recommend design water levels for selected recurrence
intervals and operating conditions.
3. Storm Surge Assessment: Review available FEMA, N OAA, USACE, and other published storm
surge information to characterize coastal storm wat er levels and support development of project
design criteria.
4. Sea Level Rise Assessment: Evaluate applicable s ea level rise projections over the anticipated
planning and service life horizons and recommend sc enarios for resilient design and adaptive
planning.
5. Wave Climate Evaluation: Characterize locally ge nerated wind waves and other relevant wave
conditions using available wind, fetch, bathymetric , and published coastal data. Recommend
representative operational and design wave conditions.
6. Vessel Wake Assessment: Evaluate vessel generate d wake conditions associated with marina and
other vessel traffic and establish representative wake parameters for waterfront and landing design.
7. Marina Operability Assessment During Coastal Sto rm Events: Evaluate the relationship between
tides, storm surge, waves, winds, and marina operat ional thresholds to identify conditions that may
limit safe marina access, docking, boarding, or departure.
8. Future Marina Landing Resiliency Evaluation: Ass ess the future marina landing concept relative to
extreme water levels, sea level rise, waves, vessel wakes, access, freeboard, and recovery
considerations, and recommend resiliency design criteria and adaptation considerations.
9. Docking Analysis, Mooring and Berthing Loads: Ev aluate representative docking conditions and
develop preliminary berthing, mooring, wind, curren t, wave and vessel-induced loads for use in the
structural design.
10. Prepare a Marina Operation and Maintenance Manu al as required by SCDES BCM and as
necessary for permitting.
Task “C” – Geotechnical Investigation (Lump Sum)
1. Contact South Carolina 811 and request marking o f public utility lines. All utility lines may not b e marked
by South Carolina 811. FME is not responsible for d amage to unmarked and/or incorrectly marked utility
lines. Beaufort County is responsible for marking any utility lines that are not marked by SC811.
2. Provide barge access for the water-based borings .
3. Advance three (3) Standard Penetration Test (SPT ) borings for the dock exploration. The borings wil l be
conducted over water from a barge for pile design a t the ferry dock. The barge borings will be extende d to
Page 116 of 430
eighty (80) feet below the mudline. SPT borings wil l be extended to the assigned boring depth. SPT
sampling will be conducted at five (5) foot intervals.
4. Advance six (6) hand auger borings for the land- based exploration. The borings will be conducted in the
parking lot for pavement section design and estimat ing seasonal high-water tables. The hand auger
borings will include Dynamic Cone Penetrometer (DCP ) testing in 1-foot intervals. Hand auger borings w ill
be extended to ten (10) feet below the ground surfa ce, auger refusal, or hole collapse; whichever come s
first.
5. Core the pavement to create access for hand auge r borings where borings are conducted over existing
asphalt or concrete.
6. One (1) bulk sample will be obtained from auger cuttings in the parking lot.
7. Evaluate the recovered SPT and hand auger sample s. We will select twelve (12) samples for
classification testing. The laboratory testing will include grain size distribution, Atterberg limits, and
moisture content determinations. The bulk sample wi ll be tested for classification, Standard Proctor, and
1-point CBR.
8. Perform two (2) double ring infiltrometer tests to determine the infiltration rate of the soil in t he parking
area. Infiltrometer tests will be conducted just below the topsoil adjacent to the existing parking lot.
9. Borings will be backfilled with auger cuttings a fter drilling is complete and groundwater measureme nts are
made. Borings conducted in the pavement will be patched with cold patch asphalt.
10. Provide a report that will include a summary of the field exploration, boring plan, boring logs, a nd
laboratory test data. The report will also include the following:
a. Estimated seasonal high groundwater level
b. Recommended infiltration rate for stormwater man agement
c. Depth of marl or limestone where pile end bearin g can be achieved
d. Evaluation of pile lateral capacity and point of fixity to aid in dock design
e. Recommended pavement section for parking and dri ves
Task “D” – Public Involvement and Conceptual Site Plan (Lump Sum)
1. Host an in-person (with virtual option) kickoff mee ting with the design team and Beaufort County staff .
2. Develop a conceptual site plan identifying how the ENVISION framework is incorporated. Present the
conceptual site plan to the Beaufort County staff.
3. Coordinate with the Beaufort County staff to presen t the conceptual plan at a stakeholder meeting on
Daufuskie Island at which the Melrose community, th e wider Daufuskie Island community, users of the
ferry, and other interested parties can ask questio ns, voice concerns, and provide input regarding the
conceptual site design.
4. Coordinate with the Beaufort County staff to upload the presentation documents onto the County’s
information website for those that cannot attend the in-person meeting.
5. Finalize the revised conceptual plan into a site pl an incorporating the public and Beaufort County sta ff
feedback as feasible.
6. Develop a construction cost estimate for the site i mprovements. If necessary, after discussion with
Beaufort County staff, adjust the site plan to address budget limitations.
7. The estimated fee is based on the following number of meetings:
a. Monthly virtual meetings with Beaufort County Staff (20)
b. Public Meetings on Daufuskie Island (1)
c. Plan presentation to Beaufort County Staff (1), Cou nty Council Public Facilities Committee (1), and Fu ll
County Council meetings (1): Total meetings (3)
Page 117 of 430
Task “E” – Engineering Design (Lump Sum)
1. Attend a design-permit kickoff meeting with the des ign team and County staff to discuss the conceptual
site plan, public input, and construction cost esti mate. Following the meeting, incorporate County sta ff
comments into the final site plan and proceed with detailed design and permitting.
2. The site design will address sustainability and res iliency by incorporating the ENVISION framework at a
level intended to support Silver certification. Thi s scope of services does not include submitting an
application for ENVISION Silver certification. The scope does include completing the ENVISION Points
Table to identify credits incorporated into the sit e plan, infrastructure design, and construction pha se that
total sufficient points to support Silver certification. The scope also includes completing one ISI EN VISION
Credit Cover Sheet for one credit incorporated into the site design to serve as an example for any fut ure
pursuit of ENVISION certification for the Melrose F erry Terminal Facility. The pursuit of ENVISION
certification is an additional service.
3. Meet with the local PSD to confirm the location, si ze, and capacity of the existing water and sewer li nes. If the
existing lines differ from the assumptions presente d in the “Project Assumptions and Exclusions”, then meet
with Beaufort County to discuss any necessary scope and fee changes.
4. Prepare a preliminary set of plans for the upland a nd waterfront improvements. The preliminary project
drawings will include the following sheets:
a. Cover Sheet
b. Project Notes and Legend
c. Existing Site and Demolition Plan
d. Overall Site Plans
e. Preliminary Drainage Plan
f. Preliminary Paving Plan
g. Preliminary Water and Sewer Service Plan
h. Preliminary Electrical Service and Site Lighting Plan
i. Preliminary waterfront structural layout, dock configuration, and elevations.
5. Based on comments received from the County, 60% of design drawings will be prepared to include the
following sheets:
a. Cover Sheet
b. Project Notes and Legend
c. Property Owner Sheet
d. Existing Site, Demolition, and Utility Conflict Plans
e. Overall Site Plan
f. Sediment and Erosion Control Plan
g. Road Plan/Profile Sheets
h. Drainage and Grading Plans
i. Pavement Marking and Signage Plan
j. Paving and Typical Pavement Section Details
k. Water and sewer plan and details
l. Pier superstructure and substructure plans
m. Floating dock layouts, performance specifications, and material requirements.
n. Gangway and pedestrian access considerations
o. Pier and landward building with architectural considerations.
6. Complete a constructability and value engineering r eview of the 60% upland civil-site designs. Revise
design documents as needed to reflect the value-engineering.
7. Review the 60% design drawings with the County. As needed, adjust the design documents to maintain the
project budget, which may require phasing the proje ct to create a phase 1 scope of work that fits with in the
County’s budget.
8. Based on comments developed from the 60% plan revie w and the phasing plan (if needed), the 90%
construction drawings will be prepared to include the following sheets:
a. Cover Sheet
b. Project Notes and Legend
Page 118 of 430
c. Property Owner Sheet
d. Existing Site Plan
e. Phasing Plan (if needed) identifying the phase 1 po rtion of the demolition and
improvements that fit within the County’s budget.
f. Demo, Move Items and Utility Relocation Plan
g. Geometric Data Sheet
h. Tree Protection Plan
i. Sediment and Erosion Control Plan
j. Sediment & Erosion Control Details
k. Paving and Utility Plan/Profile Sheets
l. Pavement Marking and Signage Plan
m. Typical Pavement Section Details
n. Pavement Marking and Signage Details
o. Conduit plan for electrical to serve the lighting d esign and irrigation lines.
p. Water and sewer service plan
q. Existing Pier Demolition Plan
r. Pier Structural Details
s. Reinforcing Details, Superstructure and Substructure Details.
t. Pier Head and Landward Building Details
u. Electrical and Lighting Plans
• Interior lighting
• Dock lighting
• Dock power pedestals
• Power distribution, telephone, and data.
• Parking lot lighting design, lighting calculations
• Energy Compliance Reports
v. Mechanical Design Plans and Details
• Mechanical Drawings
• Ductwork design,
• HVAC load calculations
• Air Distribution and balance,
• Energy Compliance Reports
w. Plumbing Systems
• Plumbing floor plans and risers
• Sanitary waste and vent systems.
• Domestic water systems.
9. Update the construction cost estimate for the 90% design.
10. Incorporate any comments coming from the 90% review into the 100% construction drawing package.
Task “F” – Permitting for the Upland Civil-Site Improvements, Stormwater, Utility Design, and Waterfront
Permitting (Lump Sum)
Upland Permitting
1. Provide hydraulic and hydrologic models of the exis ting and the proposed site conditions.
2. Model the proposed stormwater improvements for the 2, 10, 25 and 100-year storm events.
3. Prepare C-SWPPP report containing the stormwater an alysis in accordance with SCBCM and
Beaufort County MS4 requirements.
4. Construction drawings and permit applications will be submitted to the following agencies for general
coordination or having jurisdiction for review and permitting:
a. Dry Utility Companies
b. Beaufort County
c. SCBCM
d. Local PSD for water and sewer service
e. Fire marshal
Page 119 of 430
Waterfront Permitting
5. Develop joint state and federal permit application drawings.
6. Coordinate with BCM, USACE, and other regulatory agencies having jurisdiction.
7. Submit and track the permit applications.
8. Publish public notice
9. Furnish supplemental information as required by agencies having jurisdiction.
Task “G” – Filing and Permit Fees (Cost Plus)
1. Beaufort County is responsible for all capacity, application, filing, and other fees.
2. Allowance for the filing and permit fees is $5,000.
Task “H” – Bidding, Construction Administration, and Project Closeout Services (Cost Plus)
We will provide limited construction administration services on an as-needed basis and as required by local
jurisdictions to meet permit requirements. Because construction activity is fluid and difficult to pre dict, the level of
engineering support needed during construction cann ot be accurately budgeted in advance. Accordingly, we
propose providing these services on a cost-plus bas is with a fee to be determined as the project moves closer to
construction. These services will include the following:
1. Bidding:
a. Provide construction documents and specifications.
b. Respond to the bidder’s request for information.
c. Assist the County in reviewing the bids.
2. Schedule and attend the local PSD, Beaufort County, and the SWPPP pre-construction meeting on-site
with County staff, General Contractor, site contrac tor, and design team to review project plans and
address requirements of the permits.
3. Review and comment on shop drawings for civil-site improvements.
4. Review and comment on civil-site related RFIs as ne eded to keep the construction progressing in a
timely manner.
5. Visit the site at intervals appropriate to the stage of construction to observe the progress and quali ty of the
ongoing work to successfully complete the improveme nts.
6. Once the project reaches substantial completion, we will coordinate a substantial completion inspectio n of
the project with the Contractor and the County. We will prepare a punch list to address any incomplete or
deficient civil-site improvements.
7. Once the engineer considers the project to have rea ched final completion and the punch list items have been
addressed, we will coordinate with the Contractor and the County to schedule the final completion insp ection.
Any items still considered deficient will be noted in a punch list report for the Contractor to address.
8. Prepare the post-construction as-built survey of th e marine and upland improvements and review with th e
Contractor to ensure the project was properly completed.
9. Upon completion of construction, we will provide cl oseout procedures and documentation required
including the following:
a. Final Engineers Certificate as required by Beaufort County, PSD, and SCDES and
SCBCM
b. File a Notice of Termination (NOT) with Beaufort Co unty once the site has reached
stabilization as indicated by the SWPPP inspections and reports.
c. Prepare the Beaufort County Final Certificate of Completion application/submittal.
Page 120 of 430
McSweeney Engineers, LLC Upgrades to Melrose Ferry Terminal Beaufort County
Marine On-Call
Task A (Lump Sum)
Pre-Design Land And Bathymetric $46,000.00
Surveys
Task B (Lump Sum)
Coastal Hazards and Resilence Evaluation $51,500.00
Marina Operation and Maintenance Manual
Task C (Lump Sum)
Geotechnical Investigation $85,000.00
Task D (Lump Sum)
Public Involvement and Prelim Site Plan $70,000.00
Task E (Lump Sum)
Engineering Design Civil $169,000.00
Structural* $236,200.00
MEP $31,500.00
Architect $80,500.00
Task F (Lump Sum)
Permitting $64,500.00
Subtotal $834,200.00
Subtotal with 5% Subconsultant Markup $860,875.00
Task G (Cost Plus)
Filing and Permit Fees (allowance) $5,000.00
Task H (Cost Plus)
Bidding, Construction Administration, and Project Closeout Services
TBD
McSweeney $327,375.00 *Fee includes PM and meetings
FME $85,000.00
Davis and Floyd $285,000.00
JMT $51,500.00
Montgomery $80,500.00
Dalon $31,500.00
$860,875.00
Attachment B - Cost Breakdown
Page 121 of 430
McSweeney Engineers, LLC Upgrades to Melrose Ferry Terminal Beaufort County
Marine On-Call
Upland
Survey $15,000.00 Approximately 1/3 of total fee
Geotechnical $28,000.00 Approximately 1/3 of total fee
Architect $55,750.00
Prelim Site Plan $70,000.00
Civil $169,000.00
MEP $15,750.00 Approximately 1/2 of total fee
Fees $2,500.00 Approximately 1/2 of total fee
PM $13,337.50 Approximately 1/2 of total fee
$369,337.50
Waterfront
Survey $31,000.00 Approximately 2/3 of total fee
Geotechnical $57,000.00 Approximately 2/3 of total fee
Permitting $64,500.00
Coastal Engineering $51,500.00
Structural $236,200.00
Architect $24,750.00
MEP $15,750.00 Approximately 1/2 of total fee
Fees $2,500.00 Approximately 1/2 of total fee
PM $13,337.50 Approximately 1/2 of total fee
$496,537.50
Total Fee $865,875.00
Approximate Cost Breakdown Between Upland and Waterfront
Work - Melrose Ferry Terminal Replacement
Page 122 of 430
Order By:
William Davis
Sales Rep:
Written By:
JOE KELLY
CUSTOMER PICKUP
Quote Q22263
Date Out:
Est. Date In:
Customer:
BEAUFORT COUNTY GOVERNMENT-
PUBLIC WORKS & MAINTENANC
120 SHANKLIN RD
PO DRAWER 1228
0486000
KINARD FREEMAN
50500 WHYTE HARDEE BLVD
HARDEEVILLE SC 29927
Phone:
PO #:
843 255 2819
10/05/2026 Mon 08:00 AM
11/02/2026 Mon 08:00 AM
Jobsite: CPU
KINARD FREEMAN Contact:
Quote
CAT RENTAL STORE 843-784-6766
50500 WHYTE HARDEE BLVD., HARDEEVILLE, SC 29927
Signed By:
Bill to:
BEAUFORT, SC 29906-8402
DESCRIPTION QTY WEEK DAY 4WEEK
Rental Items
$3,635 1 3,635.00 ID:R21022 SERIAL:1FDNF7AN5RDF10644 MODEL: $575 $1 ,645
WATER TRUCK 2000GAL
Miscellaneous Items
ENVIRONMENTAL FE 8.00 8.00 each 1
RENTAL SURCHARGE 90.88 2.50 %0
RENTAL EQUIPMENT PROTECTION 581.60 16.00 %1
380.22 State 6% County 3% Total Tax: 9%
*
THANKS FOR RENTING FROM THE CAT RENTAL STORE
*
SC DEPARTMENT OF REVENUE HAS IMPOSED A RENTAL
SURCHARGE
4,695.70 Total:
ADDITIONAL OR POTENTIAL CHARGES
10. No document purporting to modify the terms hereof shall be binding on Lessor and no modification of this Rental Agreement shall be binding on Lessor or Customer unless in writing and
signed by Lessor and Customer.
CUSTOMER SIGNATURE DATE DATE BLANCHARD SIGNATURE
EQUIPMENT INSPECTED AND RECEIVED BY: ACCEPTED BY:
9. Customer is fully responsible for items rented, subject to complete terms and conditions on reverse side of this page.
8. Lessor reserves the right to replace the above described Equipment with like Equipment at any time.
7. Operators must be properly qualified to operate the Equipment leased hereunder.
6. There will be no adjustments for non-productive time, whether due to weather conditions or any other circumstances.
5. There is no purchase option of the Equipment leased hereunder, expressed or implied.
4. Customer is responsible for daily maintenance. Any damage or loss to the Equipment or accessories incurred in operation, transportation or other use of the Equipment, whether due
to abuse, negligence, misuse, neglect or otherwise, will be charged to Customer.
3. If rental Equipment is called off rent, Customer acknowledges that Customer will remain liable for the security of the Equipment for 3 business days after obtaining the Release
Number required above.
2. Customer acknowledges that Customer is renting the Equipment for commercial and not consumer purposes.
1. Customer agrees to lease the Equipment on the terms set forth on this page and the reverse side of this page.
Customer must call the Cat Rental Store to
receive approval for any relocation of Equipment
New Location # _____________
Customer must call for a Release Number
before Equipment will be taken off rent.
Release # __________________
ENVIRONMENTAL FEE: There will
be a $8.00 environmental fee for
each rental.
REFUELING CHARGE: Customer
is responsible to return unit full of
fuel, or a current market charge per
gallon, including labor, will be
added to the invoice to fill the tank.
CLEANING CHARGE: A clean up
charge based on current rates will
be added if unit is not returned in
same condition as rented.
LOST KEY: There will be a lost key
charge of $10.00.
{SIGNATURE} {DATE}
The customer shall be automatically charged for Rental Equipment Protection Plan (REP) if a certificate of insurance (COI) is not provided at time of rental. REP will not be refundable if the
COI is not provided at time of rental.
Printed on Wednesday, September 30, 2026 1:36:35 PM by WEDAVIS
Q22263 Page1of2
Page 123 of 430
P age 4 of 4
RENTAL AGREEMENT TERMS AND CONDITIONS
T
he terms and conditions of Lessee’s Application for Credit (the “Credit Application”) are incorporated
herein by reference, including any guaranty (a “Guaranty”) executed in connection therewith. In the
event of a conflict between this Agreement and the Credit Application, the Credit Application shall
control.
1. TITLE: Blanchard Machinery Company (“Lessor”) leases to the customer (“Lessee”) and Lessee leases
from Lessor the Equipment described on page 1. The Equipment shall include all replacement parts, additions,
repairs, and accessories incorporated therein or affixed thereto. Title to the Equipment at all times shall be and
remain in Lessor. Lessee shall keep the Equipment and title thereto free and clear of any and all liens or
encumbrances. Lessor and Lessee agree and Lessee represents for the benefit of Lessor and its assignee(s) that
the Agreement does not create a “security interest” as that term is used in the Uniform Commercial Code in
effect in the State of South Carolina (the “UCC”). Lessor and Lessee also agree that this Agreement is intended
to be a "true lease" as the term is commonly used under the Internal Revenue Code of 1986, as amended. Lessee
grants Lessor a specific power of attorney for Lessor pursuant to which Lessor and Lessee agree that Lessor is
authorized to execute and/or file any document Lessor deems necessary or desirable to protect Lessor’s interest
in the Equipment, including but not limited to financing statements under the UCC.
2. PAYMENT OF LEASE AND FINANCE CHARGES : Payment for the Equipment and other amounts
due hereunder shall be mailed to Lessor at: P.O. Box 402197, Atlanta, GA 30384-2197 or to such other address
designated in writing by Lessor. Lessee agrees to pay invoices by the dates stated in invoices mailed to Lessee.
Lessee must call for a Release Number before Equipment shall be taken off lease. Lease payments and other
charges that are not paid by the due date on any invoice shall be subject to a late charge each month that the
invoice is not paid in full on time as follows: $5 fee for past due balances of $350 to $1,000; $15 fee for $1,001
to $2,000; $30 fee for $2,001 to $3,000; $45 fee for $3,001 to $5,000; $75 fee for $5,001 to $10,000; $150
fee for $10,001 to $20,000; $300 fee for $20,001 to $50,000; $700 fee for $50,001 to $75,000; and $1,100
fee for $75,001 and above. The late fee schedule is subject to change by Lessor without notice to Lessee. Lessee
shall be responsible for all Lease payments, taxes, surcharges and other amounts due hereunder. Lessee shall
also be responsible for all costs connected with the return of the Equipment to Lessor’s place of business.
3. USE OF EQUIPMENT: Lessee acknowledges that the Equipment is being leased for business or
commercial purposes. Lessee shall not cause or permit the Equipment to be removed from or taken out of the
State of South Carolina except upon the prior written consent of Lessor. Lessee shall only permit or cause the
Equipment to be used or operated by competent, qualified personnel. Lessee shall be liable for and shall pay all
costs of operation, transportation, and use of the Equipment. Upon the expiration or termination of this
Agreement, Lessee shall return the Equipment to Lessor unencumbered by any lien or encumbrance and in as
good condition as when received by Lessee, reasonable wear and tear resulting from the proper use thereof
excepted. Any damage to the Equipment must be reported to the Lessor within twenty-four (24) hours of
discovery.
4. PAYMENT OBLIGATIONS ABSOLUTE: Lessee’s obligation to pay all rental payments and other
charges to Lessor under this Agreement are absolute and shall continue regardless of Lessee’s inability to use
the Equipment or any part thereof because of loss, damage, casualty, strike, obsolescence, weather and other
Acts of God, failure of the Equipment to properly operate or to be in compliance with any manufacturer's
warranty, or for any other cause or reason.
5. COMPLIANCE WITH LAWS / GOVERNING LAW / JURY TRIAL WAIVER: Lessee shall comply
with and conform to all laws, ordinances, and regulations which shall relate to the possession, use, operation,
transportation or maintenance of the Equipment and shall save Lessor, its officers, directors, employees and
agents harmless from and
against any and all actual or asserted violations thereof. Lessee agrees, that to the
extent applicable to this Agreement, unless exempted by federal law, regulation or order, to comply with Federal
statutes, Executive Orders, and implementing regulations, including the provisions of 29 CFR Part 470 relating
to government contractors and subcontractors regarding equal employment opportunity, affirmative action, the
employment of veterans and the handicapped and the utilization of minority or female
owned business
enterprises.
In addition to other rights and remedies available to Lessor hereunder or at law, Lessor reserves the
right to cancel, in whole or in part, this Agreement immediately upon notice to Lessee if Lessor is notified of
noncompliance by Lessee with the foregoing. Lessee shall pay Lessor any amount for which Lessor may be
liable from an assessment by any state or municipal body against the Lessor for any sales or use tax,
environmental or air permits or lease surcharge. If Lessee is exempt,
it is the Lessee’s responsibility to send
Lessor the appropriate documents from the taxing agency.
This Agreement and any related documents, including
any Credit Application or Guaranty shall be governed by the laws of the State of South Carolina. Lessee agrees
that jurisdiction and venue are proper in Lexington County State Courts for any enforcement actions related to
this Agreement, any Credit Application or Guaranty. THE PARTIES HAVE BEEN PROVIDED WITH THE
OPPORTUNITY TO CONSULT WITH INDEPENDENT COUNSEL OF THEIR OWN CHOOSING AND
HEREBY KNOWIN
GLY AND VOLUNTARILY CONSENT TO WAIVE THEIR RIGHTS TO A TRIAL BY
JURY IN ANY MATTER RELATED TO THIS AGREEMENT OR ANY DOCUMENTS ANCILLARY
HERETO,
INCLUDING ANY CREDIT APPLICATION OR GUARANTY.
6. SHIPMENT AND DELIVERY: Lessee agrees to pay all costs and expenses of transportation, packing,
installation, testing and other charges in connection with the delivery, installation and use of the Equipment.
Lessor makes no guarantee or warranty as the exact date of any shipment or delivery of the Equipment, and any
date specified in the Agreement, or any addendum is merely an estimated date of shipment or delivery. Lessor
shall have no liability whatsoever, including without limitation, special, indirect or consequential damages,
which may be incurred or sustained by Lessor’s failure for any reason to make delivery of the Equipment when
requested by Lessee. Lessee is responsible for the Equipment after calling the Equipment off lease until it is
picked up or delivered back to Lessor.
7. RENTAL EQUIPMENT, LIABILITY, AND CARGO/IN-TRANSIT PROTECTION PROGRAMS:
THE RENTAL EQUIPMENT PROTECTION PROGRAM (“REP”), RENTAL LIABILITY PROTECTION
(“RLP”), AND CARGO/IN-TRANSIT PROTECTION PROGRAM (“CIT”) ARE NOT INSURANCE
POLICIES. REP, RLP AND CIT ARE LOSS DAMAGE WAIVER PROGRAMS. REP, RLP and CIT cover
construction, forestry, power, agriculture, material handling, and other non-excluded equipment. REP, RLP, and
CIT exclude vehicles licensed for the road while in transit and underground mining. REP is a waiver of claims
to the Lessor for perils covered by REP to the Lessor’s equipment. It is not insurance for the Lessee but can
serve to supplement or replace physical damage insurance for the Lessee on rented equipment belonging to the
Lessor. RLP is a waiver of claims to the Lessor for perils covered by RLP to a third party, if and to the extent
that the contractor’s equipment rented from this facility is the cause of the incurred damage, operated by renter
or renter’s employee, during the rental period, on the approved jobsite. Renter will remain liable to the Lessor
in all events for: (a) damage or loss caused in whole or in part by: (i) breach of any provision of this Contract;
(ii) failure to return Rented Item(s); (iii) malicious mischief or illegal acts; (iv) use of any Rented Item in
violation of any
policy of insurance. CIT is a waiver of claims to the Lessor for covered perils to a third party
caused during the Lessee’s transportation of the Equipment.
1) Coverage up to $500,000 per occurrence for REP, up to $1,000,000 for RLP. If you have purchased our
Rental Equipment Protection, Lessee shall have no liability to the Lessor for physical damage to the applicable
Rented Item(s) up to the covered amount, except that you shall remain liable to the Lessor in all events for
damage or loss caused in whole or in part by: (a) your breach of any provision of this Contract; (b)
Criminal/Fraudulent Acts (c) Loss of use - REP does not cover loss of use while the equipment is being repaired;
(d) Mechanical/Electrical breakdown; (e) Missing property; (f) Wear and Tear; (g) Weight of Load; (h) damage
to tires, unless caused by a covered peril; (i) Pollution; (j) Nuclear Waste; (k) Corrosion; (l) Civil Authority.
2) Customer Contribution. In the event of a claim, Lessee shall be responsible for the following deductible: (a)
$1,000 for equipment valued up to $25,000; OR (b) $2,500 for equipment valued greater than $25,000.
3) Cost. Lessee shall pay Lessor 16% of the rental contract value to cover rented equipment with REP.
4) Covered perils. The coverage includes, but is not limited to, (a) accidental damages; (b) collisions; (c)
overturns/rollovers; (d) falling objects; (e) fire; (f) theft; (g) vandalism; (h) flood (submersion and Acts of
Nature); (i) earthquake; (j) hail; (k) wind; (l) tornado; (m) other non-excluded perils.
5) Subrogation. Lessor shall not subrogate for perils covered by REP.
8. INSURANCE: Lessee shall, at its own expense and at all times during the lease term, purchase and
maintain the following insurance:
1) Commercial general liability insurance with a combined single limit for bodily injury, including death, and
property damage of $1,000,000 on a primary and not excess or contributory basis, for Lessee’s liability for
damages sustained by any person, including but not limited to agents or employees of Lessee, because of the
maintenance, use, operation, possession, storage, erection, dismantling, servicing or transportation of the
Equipment. Lessee, and its agent and employees, shall cooperate fully with Lessor and Lessee’s insurer in an
investigation, prosecution or defense of any claim or suit arising therefrom and shall do nothing to impair or
invalidate the applicable insurance coverage.
2) Workers’ compensation insurance shall be maintained at the amounts required by statute.
3) Auto liability shall be maintained when Lessee, or another party on Lessee’s behalf, transports or intends to
transport Equipment, and the coverage shall be for $1,000,000 for any one accident or occurrence.
4) Inland marine or rental equipment insurance shall be maintained for coverage amounts to cover the
Lessee’s value of the machine, on a replacement cost valuation basis, for any damages to, or loss of, the
Equipment. Lessee’s policy must expressly cover non-owned Equipment while in Lessee’s care, custody, or
control.
5) Other terms required include that Lessor shall be an additional insured for commercial general liability,
auto liability, and workers’ compensation policies. Lessor shall be a loss payee for the inland marine coverage.
Lessee shall include a waiver of subrogation endorsement in favor of the Lessor, and Lessee’s insurance
coverages shall be primary and non-contributory. Lessee agrees to abide by all of the terms and conditions of
such insurance. Lessee acknowledges that evidence of insurance shall not be deemed to be a waiver, limit, or
modify of Lessee’s indemnity or other obligations set forth herein. Lessee acknowledges that Lessee shall
remain liable for the security of the Equipment until delivered to Lessor at the end of the lease term. Lessee
shall furnish Lessor a Certificate of Insurance evidencing such insurance and endorsed to provide that such
insurance may not be cancelled or materially modified except on thirty (30) days prior written notice.
9. INDEMNIFICATION: Lessee shall indemnify, defend, and hold harmless Lessor, its officers, directors,
employees and agents, from and against any and all damage or injury to or loss of the Equipment or any part
thereof and from and against any and all claims, damages, judgments, and liability whatsoever to persons or
property occasioned by or resulting from use, operation, taxation, possession or transportation of the Equipment;
provided, however, that Lessee, upon receipt by Lessor, shall be entitled to a credit for any sums paid to Lessor
for damage to or any loss of or injury to the Equipment, whether through insurance or otherwise.
10. EQUIPMENT ALTERATION: Lessee shall not change, alter, or remove any markings, insignia, lettering,
or numbering on the Equipment.
11. CONDITION UPON DELIVERY: Lessee shall be conclusively presumed to have accepted the
Equipment in the condition, existing at the time of delivery hereunder unless within forty -eight (48) hours
thereafter, Lessee shall notify Lessor of any actual existing defects and of Lessee’s refusal to accept the
Equipment in its then condition. Thereupon, Lessor, without liability to Lessee, may elect to either correct any
such defect or reimburse Lessee for any lease payments paid hereunder and terminate this Agreement.
12. REPAIRS: Lessee at all times shall maintain the Equipment in good repair and operating condition. Lessee
agrees to check engine oil, water, and fuel daily. Lessee is responsible for all periodic maintenance such as
greasing, fuel, and missing parts. All repairs and replacements shall be made by qualified personnel only, and,
for such purposes, only standard parts and accessories may be used. Lessee shall pay all claims arising from the
Lessee’s abuse, neglect or negligent use of the Equipment or from the Lessee’s failure to maintain the Equipment,
ordinary wear and tear from the proper use thereof excepted. Lessee shall be responsible for any tire failures or
abnormal tire wear. Lessee shall use the Equipment only for the purpose for which it is designed and intended.
If any unit of Equipment becomes damaged, from any cause whatsoever, or becomes worn -out, lost, stolen or
destroyed, then Lessee must report same to Lessor within twenty-four (24) hours of discovery.
13. LOCATION/INSPECTIONS: Lessee, whenever requested, shall provide Lessor with the exact location
of the Equipment. Lessee shall give Lessor immediate notice of any attachment or other judicial proceeding
affecting the Equipment and shall indemnify and save Lessor harmless from and against any and all loss or
damage that may result therefrom. Lessor, for the purpose of inspection, at all reasonable times, may enter upon
any building, structure, or place where the Equipment is located and Lessor may remove the Equipment if, in
the discretion of Lessor, the Equipment is being used beyond its capacity, in an unsafe manner or if it is being
improperly cared for or abused.
14. DISCLAIMER OF WARRANTIES / NO ORAL AGREEMENTS: OTHER THAN THE GENERAL
DESCRIPTION OF THE EQUIPMENT HEREIN, LESSOR MAKES NO REPRESENTATION WITH
RESPECT TO THE EQUIPMENT. LESSOR DISCLAIMS ANY REPRESENTATION, OR WARRANTY,
EXPRESSED OR IMPLIED, WITH RESPECT TO QUALITY, MERCHANTABILITY, FITNESS FOR A
PARTICULAR PURPOSE, WITH RESPECT TO THE EQUIPMENT OR THE FREEDOM FROM CLAIMS
BY ANY PERSON BY WAY OF INFRINGEMENT OR OTHERWISE, IN NO EVENT SHALL LESSOR
BE LIABLE TO LESSEE FOR LOST PROFITS, ANTICIPATED PROFITS, INCIDENTAL OR
CONSEQUENTIAL DAMAGES OR DOWN TIME. This Agreement constitutes the entire agreement between
Lessor and Lessee and no oral agreement, guaranty, promise, condition, or representation heretofore made or
claimed to have been made by Lessor shall be binding on Lessor unless herein expressly stated. Lessee is aware
of all safety features available to the Equipment and has accepted the Equipment with the safety features it
deems appropriate, as delivered.
15. DEFAULT: If Lessee defaults in payment or performance hereunder, becomes insolvent or cease doing
business as a going concern, or files a petition under the United States Bankruptcy Code, 11 USC §101 et seq.,
or if a petition is filed by or against Lessee under any state court receivership statute, or if Lessee attempts to
remove, sell, transfer, or encumber or part with possession of the Equipment, then Lessor, without notice or
liability may, to the extent permitted by applicable law, enter in to any premises where the Equipment may be
located and retake possession of the same, disconnecting and separating the Equipment from any other property
using all force necessary or permitted by applicable law, or may in the alternative, institute legal proceedings
to recover possession of the Equipment and/or to recover any amounts due hereunder. Lessee hereby expressly
waives all rights to possession of the Equipment and all claims for injury or loss sustained or suffered by Lessee
by reason of any repossession of the Equipment by Lessor. Lessor shall be entitled to recover reasonable
attorney's fees as well as other costs in the event Lessor enforces any right or remedy granted hereunder or by
law.
16. NO ASSIGNMENT AND SUBLETTING: Lessee shall not assign or in any manner transfer this
Agreement or any estate, interest or benefit herein. Neither shall Lessee sublet the Equipment or permit the use
of the same by anyone other than Lessee and its employees, without the prior written consent of Lessor.
17. TERMINATION / EFFECT OF TERMINATION: In the event of a default, Lessor may terminate the
Agreement. If Lessor shall terminate this Agreement or shall terminate Lessee’s possession of the Equipment
prior to the expiration of the lease term, lease payments shall not abate by reason thereof or for any other reason,
and unpaid installments of lease payments and other charges due hereunder shall by charged a late fee from the
due date thereof per the late fee schedule provided in Section 2. Lessor also reserves the right to terminate this
Agreement at its option at any time, regardless of default, upon five (5) days written notice to the Lessee and
to retake possession of the Equipment.
18. WAIVER: Failure of Lessor to insist on strict performance of any of the covenants or agreements
regardless of whether Lessee elects and pays for the fire, theft and vandalism waiver set forth herein shall not
be construed to be a waiver of any such covenants and those and all other covenants or agreements contained
herein and shall remain in full force and effect.
19. DATA COLLECTION: Customer understands that data collected from the Equipment, asset owners,
other devices, and other sources may be used to provide better services to you and other customers, allow
communication with the device and applications, and for general business purposes. The data transmitted may
include personal information (such as your name or business location), system data (such as Equipment
operational data including fault codes), and operations data (such as work order data and inventory utilized).
The data collected may be accessed by Caterpillar, its affiliates, Lessor, and service providers in order to provide
better services to our customers.
20. LEASE OF AN ON-HIGHWAY VEHICLE: DOT-RELATED: The following shall apply if a LESSEE
is leasing a piece of Equipment that shall be used on a highway (regulated by the Department of Transportation).
Lessor hereby leases the Equipment to Lessee. Lessee warrants and agrees that the Equipment should not be
operated or used: (a) In violation of any law, ordinance, rule or regulation of any government agency or body or
by any person under the age of twenty-one (21) who is not duly licensed and qualified; (b) By any person except
the Lessee, an employer of Lessee, any person regularly employed by such Lessee, or an additional authorized
driver; (c) By any driver who has given a fictitious name or address; (d) By any person under the influence of
intoxicants or drugs, or suffering from any incapacity affecting the ability to drive; (e) In excess of applicable
speed limits; in a reckless or abusive manner, or in races or speed contests; (f) Outside the scope of the driver’s
employment and the usual course of business of Lessee; (g) To transport a weight which is either in excess of
the maximum pay load specified or improperly loaded or secured; and (h) To transport hazardous materials as
defined by the Department of Transportation Standards. Lessee agrees to notify Lessor of any change of driver
and arrange for Lessor to perform safety checks on any such additional driver. Lessee acknowledges and agrees:
(a) That the Equipment is the property of Lessor; (b) That Lessee has inspected the Equipment in the presence of
the Lessor and that it
is received by Lessee in good condition, mechanically and otherwise; (c) That no repairs,
adjustments, or replacement of any parts shall be made without Lessor’s written authorization;(d) That the
Equipment shall at all times be operated under Lessee’s exclusive dominion and control and only in connection
with the present business of Lessee, and that neither Lessee nor the driver of the Equipment shall be deemed
the agent of Lessor; (e) To pay any special license of tax required by the business of Lessee including without
limitation such licenses, taxes or tolls as are imposed against the Lessee from or arising out of the operations
of the Equipment, and Lessee further agrees to file or assist Lessor in filing any and all returns or reports
required by any agency or governmental body as a result of the use or operation of the Equipment; and (f) To
turn in to Lessor a completed trip record at the end of each trip which Lessor can file necessary licensing and
fuel tax reports. Lessee also agrees to reimburse Lessor for any fines or cost resulting from improperly prepared
trip reports. There shall be no passengers allowed in the Equipment. For Equipment uses on -road fuel, Lessor
shall check the fuel upon return of Equipment. If off- road fuel is discovered, the Lessee shall be charged for
the removal of the off-road fuel plus the cost of refilling with on-road fuel plus reimbursements for any filters
relating to the use of off-road fuel. The Lessor agrees to cooperate with all Federal, State and Local Law
Enforcement officials nationwide to provide the identity of any Lessee who operates the Equipment.
21. ENVIRONMENTAL FEE: Lessor takes various measures to comply with federal and state
environmental regulations, as well as with Lessor’s own policies. Lessor also incurs a wide range of
environmental related expenses (both direct and indirect). These expenses may include
construction/maintenance of cleaning facilities and shops, waste disposal, acquisition of more fuel-efficient
equipment, labor costs, administrative costs, etc. To help defray these and other costs, Lessor charges an
environmental fee in connection with its leases. This fee is not a tax or governmentally mandated charge. It is
not designated for any particular use or placed in an escrow account. Rather, it is a fee that Lessor collects, not
as a reimbursement of any particular expenses, but as an administrative fee which it uses at its discretion.
22. EXCESS USAGE: Lessee hereby agrees that this Lease is based on a maximum of one hundred sixty
(160) hours usage per month unless otherwise expressly stated on page 1. If the Equipment is not purchased, for
each month of the Lease, the Lessee shall pay the excess usage charge for any hours over one hundred sixty
(160) hours per month payable as Additional Rent within ten (10) days from the date of invoice.
23. RIGHT TO LIEN: Blanchard shall have a lien as allowed by law for unpaid charges incurred hereunder
upon the premises and improvements upon which the Equipment is employed.
24. Customer acknowledges that Caterpillar Inc. and its subsidiaries and affiliated entities (collectively,
“Caterpillar”) and Blanchard Machinery Company (“Dealer”) each collect, use, retain, disclose, and otherwise
process personal information for, among other purposes, providing information about warranty, customer
marketing and promotional material about Cat
erpillar and/or Dealer products or services. Caterpillar’s Glo bal
Data
Privacy Statement (GDPS) is available at http://www.caterpillar.com/dataprivacy . Dealer’s privacy
statement is available at: https://www.blanchardmachinery.com/privacy. Dealer and Caterpillar may share or
disclose said personal information with the other. Customer agrees that nothing contained h erein impacts any
authorization or
consent previously provided to Caterpillar or Dealer.
Initials
{IFTV}Q22263 Page2of2
Page 124 of 430
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
APPROVAL OF CHANGE ORDER TO PARRISH & PARTNERS FOR THE BURNT CHURCH PATHWAY ($63,936)
MEETING NAME AND DATE:
County Council November 9, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of change order to Parrish & Partners for the Burnt Church Pathway ($63,936)
PRESENTER INFORMATION:
Bryan Bauer, Director of Engineering (5 min)
ITEM BACKGROUND:
This project was initiated and approved as part of the 2018 Sales Tax Program and is governed by the
cooperative intergovernmental agreement and encroachment permit between SCDOT and Beaufort County.
On March 10,2022 Beaufort County retained Parrish & Partners as overall project design engineer for the
Burnt Church Road and Sidewalk Improvement project. Work commenced on March 29 ,2022. To
accommodate current funding, the project scope was redefined as part of resolution 2025/2026 on July
14,2023
Project design continues at this time. Due to design conflicts with a set of existing utility poles, engineers have
determined that relocating a portion of the envisioned sidewalk will be the most cost efficient remedy.
The additional consultant services are therefore necessary for furtherance of design of the new sidewalk.
FISCAL IMPACT:
The change order for additional engineering services for redesign of a portion of the project sidewalk is
$58,126. Staff recommends a 10% contingency of $5,810 for a total budget increase of $63,936. The funding
for this project is from Account No. 4705-80-0000-54500 PTHWY with a current balance of $17,226,840.32
APPROVAL HISTORY:
Resolution 2025/46 Project Redefined (by council) July 14, 2025
Page 125 of 430
Right of Way Support Services for Beaufort County
Project ID # 24341-017
S-163 (Burnt Church Road). Sidewalk Improvements
PURPOSE
Freehold Focus (CONSULTANT) has been requested to pr epare a scope and fee to provide Right of Way
Support Services to Parrish & Partners and Beaufort County (CLIENT) for a sidewalk project for Beaufort
County on and around S -163 (Burnt Church Road) from S -13 (Bridge Street / Alljoy Road) to Bluffton
Parkway. Freehold Focus has prepared the following scope of services to support the CLIENT in delivering
this project.
SCOPE OF SERVICES
The CONSULTANT, acting as an agent on behalf of the CLIENT, shall provide limited right of way support
services for the Project as outlined herein. The CLIENT, through its assigned project manager and/or
designee, will retain final authority over all project decisions.
General Assumptions
• All construction activities are anticipated to occur within existing right of way with the exception
of one (1) parcel (tract 31).
The CONSULTANT shall:
• Identify parcels requiring Temporary Construction Easements (TCEs) related to slope tie- ins
and/or driveway impacts.
• Prepare slope and/or driveway Temporary Construction Easements (TCEs) for affected properties.
• Coordinate with property owners and obtain executed Temporary Construction Easements (TCEs)
for up to seven (7) parcels.
• The CONSULTANT may be requested to handle the acquisition or conveyance of tract 31.
o ($6,981 of NTE fee)
• Maintain communication logs and provide status updates to the CLIENT as needed.
• The CONSULTANT shall be responsible for recording the Temporary Construction Easements
(TCEs) and any other conveyance documents.
Exclusions
It is assumed that Beaufort County will require all Temporary Construction Easements (TCEs) to be
obtained on a gratuitous basis. Based on this assumption, the following services are expressly excluded
from this scope, with the exception of tract 31:
• Title searches, title abstracts, or title opinions
• Appraisals or appraisal reviews
• Determination or negotiation of just compensation
• Relocation assistance services
• Condemnation services or preparation of condemnation packages
• Recording of documents or payment of recording fees
• Legal services or litigation support
• Expert testimony
Page 126 of 430
SCHEDULE
The CONSULTANT will have five (5) months to complete the scope of services.
FEE
Right of Way Support Services shall be invoiced on a cost per parcel basis not-to-exceed $29,626.
Invoiced: 1/3 due upon Initial Contact
1/3 due upon Presentation of Temporary Construction Easements (TCEs)
1/3 due upon Consent or Denial of Temporary Construction Easements (TCEs)
CONSULTANT: CLIENT:
Freehold Focus, LLC PARRISH & PARTNERS
______________________________ ________________________________
By: Summer Frost, Owner By: _____________________________
Date: September 4, 2026 Its: ______________________________
Date: ____________________________
Page 127 of 430
F&ME Consultants, Inc. ► 211 Business Park Blvd | Columbia, South Carolina 29203 ► 803.254.4540 ► www.fmeconsultants.com
June 15, 2026
Don Alexander, P.E.
Operations Manager
Parish & Partners, LLC
6701 Carmel Road, Suite 210
Charlotte, NC 28226
Re.: Proposal for Geotechnical Exploration (Revised)
Burnt Church Road Sidewalk Improvements
Bridge Street / Alljoy Road (S-13) to Bluffton Parkway
Beaufort, South Carolina
FME Proposal No.: G2026047
Dear Mr. Alexander:
F&ME Consultants, Inc. (FME) is pleased to submit the enclosed proposal for performing
geotechnical exploration for the Burnt Church Road Sidewalk Improvements in Beaufort County,
South Carolina. FME’s understanding of the project, proposed scope of work, and fee are included
in this proposal.
Sincerely,
FME
Alex M Chandler, PE
Geotechnical Engineer
Acceptance of this proposal can be acknowledged by the client signing and returning a copy of
this document.
______________________________
Authorized Representative
_______________________________
Date
Page 128 of 430
G2026047 - FME Proposal for Burnt Church Road Sidewalk Improvements Page 2
Project Description
The original project was a widening of Burnt Church Road. FME understands that project has been
indefinitely put on hold and the County wishes to perform a sidewalk a project. Initial information
about the new sidewalk project was provided during a phone c onversation between Don
Alexander of Parrish & Partners, LLC (P&P) and Alex Chandler of FME on March 23, 2026 . The
phone call was followed up by an e -mail from Don Alexander . P&P requested a geotechnical
exploration for the proposed sidewalk improvements t o Burnt Church Road in Beaufort County,
South Carolina. The project limits will be from Bridge Street / Alljoy Road (S -13) to Bluffton
Parkway. The construction limits are approximately 7,000 linear feet. Included with the e-mail was
the preliminary right of way plans dated December 9, 2025. Based on th e plans the max cut and
fill heights are expected to be approximately three (3) feet. P&P Stated that the C ounty is
considering using pervious pavement and requested FME to perform infiltration testing along the
sidewalk alignment. Mr. Alexander also wrote that pavement recommendations are needed at
Stroup Lane which is used regularly by on road dump trucks.
Proposal was revised based on a June 10, 2026 email from Don Alexander to Alex Chandler
reducing the scope. Based on information from the C ounty, the project is not being held to the
SCDOT GDM.
Scope of Work
a) FME will contract SC811 prior to drilling operations. Private utility marking was not
requested. The County is responsible for marking underground utilities that are not
marked by SC811
b) FME will perform seven (7) hand auger borings as part of this exploration. Borings will be
placed along the proposed sidewalk footprint and spaced at approximately every one
thousand (1,000) feet. One (1) boring will be placed in the footprint of the new pavement
on Strout Street. Boring will be performed to a depth of five (5) feet below the existing
ground surface (bgs). Dynamic Cone Penetrometer (DCP) testing will be conducted in one
(1) foot intervals over the course of each boring.
c) One (1) pavement core will be performed on Stroup Street to allow for boring access.
d) Groundwater levels will be measured at the time of boring . At the conclusion of borings,
the boreholes will be backfilled with auger cuttings.
e) FME will collect four (4) composite bulk samples from the auger cutting s of near surface
soils.
Page 129 of 430
G2026047 - FME Proposal for Burnt Church Road Sidewalk Improvements Page 3
f) FME will perform four (4) double ring infiltration test along the sidewalk alignment. the
testing will be performed below the topsoil layer expected to be less than 1 foot thick
across the project limits.
g) Recovered soil samples will be classified in the field per the Unified Soil Classification
System (USCS) by the Visual -Manual Soil Classification method. Samples will be placed in
plastic bags and sealed after classification. Samples will be transported to FME’s laboratory
where a select number of samples will be tested. The laboratory test program will include
Seven (7) grain size distributions, Atterberg limits, and moisture content determinations.
The bulk samples will be tested for classification and 3 -point California Bearing Ratio
Testing.
h) FME will provide a geotechnical report that will include a site location plan , a boring
location plan , boring log s, and laboratory test data. The report will also include the
following recommendations;
• Site preparation and grading;
• Groundwater mitigation, if shallow groundwater is encountered;
• Estimated infiltration rate of onsite soils;
• K-value for slab design;
• Heavy-duty pavement section at Stroup Lane.
Fee
FME will perform the above scope of work for the lump sum fee of $28,500.
An invoice will be provided after the report has been e-mailed to P&P.
Assumptions and Limitations
a) FME is not responsible for damage to unmarked or incorrectly marked underground utilities.
b) Northing/Easting coordinates and elevations of field test locations will be obtained by Trimble
R6 GPS equipment or estimated from Google Earth. Coordinates and elevations provided by
FME will not be equivalent to a survey by a licensed surveyor. Surveying is not included in
FME’s scope of work.
c) New storm drain lines and cross line culverts are not included in the project.
d) Retaining walls, mast arms, and other structures are not included in the project.
e) The project is not being held to the SCDOT GDM.
Page 130 of 430
G2026047 - FME Proposal for Burnt Church Road Sidewalk Improvements Page 4
f) The exploration is not intended to search for subsurface contamination . If FME believes
contaminated soil and/or groundwater are present in the boring based on odor, then we will
inform P&P of our suspicion. It will be up to the owner to determine if additional work is
necessary to evaluate the level of contamination, if any.
Page 131 of 430
Project ID: Burnt Church Sidewalk Date Prep.:6/15/2026
County: Beaufort Prepared By: AMC
Org: FME
Type Work (FIELD) Procedure Procedure Description Pay Unit Quantity Unit Rates Total Cost
Mobilization
a. Truck/Trailer Drill Rig and
Crew $ per mile $5.50 $0.00
b. Track/Rubber-Tire ATV
Drill Rig and Crew; and barge
mobilized over land
$ per mile $7.50 $0.00
c. Barge mobilized over water $ per hour $450.00 $0.00
Use of All-terrain Vehicle $ per day $275.00 $0.00
Use of Swamp/Marsh Buggy $ per day $6,100.00 $0.00
Crane $ per hour $550.00 $0.00
Barge
a. small $ per day $3,275.00 $0.00
b. large $ per day $5,600.00 $0.00
Difficult Moving/ Standby/
Expendables $ per hour $285.00 $0.00
Private Utility Locating $ per hour $280.00 $0.00
Traffic Control
a. Shoulder work > 15 ft. $ per day 1 $365.00 $365.00
b. Shoulder work 1-15 ft. $ per day $820.00 $0.00
c. Lane Closure $ per day $2,650.00 $0.00
d. Freeway/Expressway
Shoulder Closure $ per day $280.00 $0.00
e. Freeway/Expressway Lane
Closure $ per day $4,150.00 $0.00
Light Plant $ per day $220.00 $0.00
Bridge Deck Coring $ per hole $280.00 $0.00
Pavement Coring $ per hole 1 $176.00 $176.00
Survey Crew and Equipment $ per hour 4 $225.00 $900.00
Hand Clearing $ per hour 4 $220.50 $882.00
Mechanized Clearing $ per hour $412.00 $0.00
Auger Probes or Wash
Borings $ per foot $12.50 $0.00
Soil Test Borings on Land
with Standard Penetration
Testing (SPT-N)
AASHTO T206,
AASHTO T306
(ASTM D1586,
ASTM D6151,
ASTM D4633)
Standard Method of Test for
Penetration Test & Split Barrel
Sampling of Soils
a. Borings from ground
surface to a depth of 150 feet $ per foot $23.50 $0.00
b. Borings from 150 feet to
250 feet $ per foot $49.00 $0.00
Soil Test Borings Over Water
with Standard Penetration
Testing (SPT-N)
AASHTO T206
(ASTM D1586,
ASTM D4633)
Standard Method of Test for
Penetration Test & Split Barrel
Sampling of Soils
$ per foot $43.00 $0.00
Standard Penetration Tests
(Additional)
AASHTO T206
(ASTM D1586)
Standard Method of Test for
Penetration Test & Split Barrel
Sampling of Soils
$ per test $32.50 $0.00
Piezocone Penetration Test
(CPTu) ASTM D 5778
Standard Test Method for
Electronic Friction Cone and
Piezocone Penetration Testing
of Soils
$ per foot $22.50 $0.00
CPTu Seismic Test ASTM D 7400 Standard Test Methods for
Downhole Seismic Testing$ per test $38.50 $0.00
CPTu Pore Pressure
Dissipation Test $ per hour $340.00 $0.00
Field Vane Shear Tests AASHTO T223
(ASTM D2573)
Standard Method of Test for
Field Vane Shear Test in
Cohesive Soil
$ per test $350.00 $0.00
Flat Plate Dilatometer Testing ASTM D6635
Standard Test Method for
Performing the Flat Plate
Dilatometer
$ per foot $22.50 $0.00
Manual (Hand) Auger Borings $ per hour 5 $180.00 $900.00
Dynamic Cone Penetrometer
Tests
Sowers & Hedges,
1966 (ASTM
D6951)
Standard Test Method for Use
of the Dynamic Cone
Penetrometer in Shallow
Pavement Applications
$ per hour 5 $249.00 $1,245.00
Disturbed (Bulk) Soil Samples $ per
sample 4 $75.00 $300.00
Test Pits $ per hour 4 $275.00 $1,100.00
Undisturbed (Shelby Tube)
Soil Sampling
a. 3" tube (Fixed Head
Sampler)
AASHTO T207
(ASTM D1587)
Standard Method of Test for
Thin Walled Tube Sampling of
Soils
$ per
attempted
sample
$141.00 $0.00
b. 3" tube (Alternative
Sampler)
AASHTO T207
(ASTM D1587,
ASTM D6519)
Standard Method of Test for
Thin Walled Tube Sampling of
Soils
$ per
attempted
sample
$235.00 $0.00
Rock Coring
a. Rock Coring from ground
surface to a depth of 150 feet
AASHTO T225
(ASTM D2113)
Standard Method of Test for
Diamond Core Drilling for Site
Investigation
$ per foot $84.00 $0.00
b. Rock Coring from 150 feet
to 500 feet
AASHTO T225
(ASTM D2113)
Standard Method of Test for
Diamond Core Drilling for Site
Investigation
$ per foot $100.00 $0.00
c. Rock Coring from ground
surface to a depth of 150 feet
for seismic downhole testing
AASHTO T225
(ASTM D2113)
Standard Method of Test for
Diamond Core Drilling for Site
Investigation
$ per foot $110.00 $0.00
GEOTECHNICAL COST ESTIMATE
Page 132 of 430
Casing
a. 4" PVC $ per foot $11.00 $0.00
b. 4" Steel $ per foot $12.00 $0.00
Grout Seal of Test Holes
(SPT, CPT, DMT,
auger/wash borings,
geophysical holes, rock core
holes)
$ per foot $10.00 $0.00
Geophysical Testing
Geophysical Testing Setup $ per test
location $650.00 $0.00
Geophysical Testing using
Downhole Methods ASTM D7400Standard Test Methods for
Downhole Seismic Testing
$ per test
interval $66.00 $0.00
Geophysical Testing using
Spectral Analysis of Surface
Waves/Multi- channel
Analysis of Surface
Waves/Refraction
Microtremor
$ per test $3,965.00 $0.00
Geophysical Testing using
Seismic Refraction MethodsASTM D5777
Standard Guide for Using the
Seismic Refraction Method for
Subsurface Investigation
$ per test $3,965.00 $0.00
Geophysical Testing using
Electric Resistivity (Corrosivity
Testing)
ASTM G57
Standard Test Method for Field
Measurement of Soil Resistivity
Using the Wenner Four-
Electrode Method
$ per test $3,600.00 $0.00
Geophysical Testing using
Suspension Logging methodsASTM D5753
Standard Guide for Planning and
Conducting Borehole
Geophysical Logging
$0.00
Specialized Geophysical
Testing (Seismic Reflection,
Crosshole Shear Wave
Velocity Method, Electrical
Resistivity Tomography (ERT)
or Electrical Resistivity
Imaging (ERI),
Gamma/Spontaneous
Potential, Ground Penetrating
Radar, Optical/Acoustic
Televiewer, etc.)
AASHTO/ASTM
Applicable AASHTO or ASTM
procedure and manufacturer's
instruction for equipment in use.
$0.00
Installation and Monitoring of
geotech. Instr. (inclinometers,
piezometers, settlement
plates, vibration monitoring,
etc.)
AASHTO/ASTM
Applicable AASHTO or ASTM
procedure and manufacturer's
instruction for equipment in use.
$0.00
SUBTOTAL = $5,868.00% of TOTAL = 20.59
Type Work (LAB) Procedure Procedure Description Pay Unit Quantity Unit Rates Total Cost
UD Preparation $ each $225.00 $0.00
Moisture Content AASHTO T265
(ASTM D2216)
Standard Method of Test for
Laboratory Determination of
Moisture Content of Soils
$ each 7 $14.50 $101.50
Atterberg Limits
AASHTO T89
AASHTO T90
(ASTM D4318)
Standard Method of Test for
Determining the Liquid Limit of
Soils And Determining the
Plastic Limit and Plasticity Index
of Soils
$ each 11 $105.00 $1,155.00
Shrinkage Limits AASHTO T92
(ASTM D4933)
Standard Method of test for
Determining the Shrinkage
Factors of Soils
$ each $143.00 $0.00
Swell Test AASHTO T258 Standard Method of Test for
Determining Expansive Soils$ each $400.00 $0.00
Grain Size Analysis
a. Wash 200 AASHTO T11
(ASTM D1140)
Standard Method of Test for
Materials Finer Than 75-μm (No.
200) Sieve in Mineral
Aggregates by Washing
$ each $55.00 $0.00
b. Grain Size ASTM D6913 Standard Method of Test for
Particle Size Analysis of Soils$ each 11 $116.00 $1,276.00
c. Hydrometer and Grain SizeASTM D7928 &
ASTM D6913
Standard Test Method for
Particle-Size Distribution
(Gradation) of Fine-Grained
Soils Using the Sedimentation
(Hydrometer) Analysis and
Standard Method of Test for
Particle-Size Distribution
(Gradation) of Soils Using Sieve
Analysis
$ each $200.00 $0.00
d. Elutriation SC T-34 Mechanical Analysis of Soils
(Elutriation Method) $ each $160.00 $0.00
Percentage of Fractured
Particles in Coarse
Aggregates
ASTM D5821
Standard Test Method for
Determining the Percentage of
Fractured Particles in Coarse
Aggregates
$ per bulk
sample $120.00 $0.00
Specific Gravity AASHTO T100
(ASTM D854)
Standard Method of Test for
Specific Gravity of Soils $ each $70.00 $0.00
Unit Weight
Page 133 of 430
a. Standard Proctor AASHTO T99
(ASTM D698)
Standard Method of Test for
Moisture-Density Relations of
Soils Using a 5.5 lb. Rammer
and a 12-in. Drop
$ each 4 $155.00 $620.00
b. Modified Proctor AASHTO T180
(ASTM D1557)
Standard Method of Test for
Moisture-Density Relations of
Soils Using a 10 lb. Rammer
and an 18-in. Drop
$ each $176.00 $0.00
c. Maximum Index Density
and Unit Weight of Soils ASTM D4253
Standard Method of Test for
Maximum Index Density and Unit
Weight of Soils Using a
Vibratory Table
$ each $335.00 $0.00
d. Minimum Index Density and
Unit Weight of Soils ASTM D4254
Standard Method of Test for
Minimum Index Density and Unit
Weight of Soils Using and
Calculation of Relative Density
$ each $152.00 $0.00
California Bearing Ratio AASHTO T193
(ASTM D1883)
Standard Method of Test for The
California Bearing Ratio $ each 4 $650.00 $2,600.00
Unconfined Compressive
Strength of Cohesive Soil
AASHTO T208
(ASTM D2166)
Standard Method of Test for
Unconfined Compressive
Strength of Cohesive Soil
$ each $145.00 $0.00
Compressive Strength of
Rock Cores ASTM D7012
Standard Test for Compressive
Strength and Elastic Moduli of
Intact Rock Core Specimens
under Varying States of Stress
and Temperatures
$ each $475.00 $0.00
LA Abrasion
a. Small-Size Coarse
Aggregate ASTM C131
Standard Test Method for
Resistance to Degradation of
Small-Size Coarse Aggregate
by Abrasion and Impact in the
Low Angeles Machine
$ each $270.00 $0.00
b. Large-Size Coarse
Aggregate ASTM C535
Standard Test Method for
Resistance to Degradation of
Large-Size Coarse Aggregate
by Abrasion and Impact in the
Low Angeles Machine
$ each $290.00 $0.00
Soundness of Aggregates ASTM C88
Standard Test Method for
Soundness of Aggregates by
Use of Sodium Sulfate or
Magnesium Sulfate
$ each $610.00 $0.00
Permeability Test
a. Constant Head AASHTO T215
Standard Method of Test for
Permeability of Granular Soils
(Constant Head)
$ each $345.00 $0.00
b. Falling Head ASTM D5856
Standard Test Method for
Measurement of Hydraulic
Conductivity of Porous Material
Using a Rigid-wall, Compaction-
mold Permeameter
$ each $340.00 $0.00
c. Flexible Wall ASTM D5084
Standard Test Method for
Measurement of Hydraulic
Conductivity of Saturated
Porous Material Using a Flexible
Wall Permeameter
$ each $450.00 $0.00
Ignition Loss SC T-36 Procedure for Determining %
Ignition Loss of Inorganic Soils$ each $105.00 $0.00
Triaxial Shear
a. Unconsolidated Undrained
(UU)
AASHTO T296
(ASTM D2850)
Standard Method of Test for
Unconsolidated, Undrained
Compression Strength of
Cohesive Soils in Triaxial
Compression
$ each $630.00 $0.00
b. Consolidated Undrained
with pore pressure
measurement (CU w/pp)
AASHTO T297
(ASTM D4767)
Standard Method of Test for
Consolidated, Undrained Triaxial
Compression Test on Cohesive
Soils
$ each $1,225.00 $0.00
c. Consolidated Drained (CD) ASTM D7181
Standard Test Method for
Consolidated Drained Triaxial
Compression Test for Soils
$ each $1,600.00 $0.00
Direct Shear AASHTO T236
(ASTM D3080)
Standard Method of Test for
Direct Shear Test of Soils Under
Consolidated Drained Conditions
$ each $995.00 $0.00
Consolidation
a. Consolidation Test (16 load
increments)
AASHTO T216
(ASTM D 2435)
Standard Method of Test for
One Dimensional Consolidation
Properties of Soils
$ each $1,175.00 $0.00
b. Additional load increments $ each $80.00 $0.00
c. Additional test time $ per day $115.00 $0.00
Organic Content AASHTO T267
(ASTM D2974)
Standard Method of Test for
Determination of Organic
Content in Soils by Loss on
Ignition
$ each $81.00 $0.00
pH
a. soil AASHTO T289
(ASTM G51)
Standard Method of Test for
Determining pH of Soil for Use
in Corrosion Testing
$ each $55.00 $0.00
b. water ASTM D1293 Standard Test Methods for pH
of Water $ each $55.00 $0.00
Chloride Content
Page 134 of 430
a. soil AASHTO T291
Standard Method of Test for
Determining Water-Soluble
Chloride Ion Content in Soil
$ each $115.00 $0.00
b. water ASTM D512 Standard Test Methods for
Chloride Ion in Water $ each $115.00 $0.00
Sulfate Content
a. soil AASHTO T290
(ASTM C1580)
Standard Method of Test for
Determining Water-Soluble
Sulfate Ion Content in Soil
$ each $120.00 $0.00
b. water ASTM D516 Standard Test Methods for
Sulfate Ion in Water $ each $120.00 $0.00
Resistivity
a. soil AASHTO T288
Standard Method of Test for
Determining Minimum
Laboratory Soil Resistivity
$ each $160.00 $0.00
b. water ASTM D1125
Standard Test Methods for
Electrical Conductivity and
Resistivity of Water
$ each $148.00 $0.00
Bituminous Mixture Extraction SC-T-75
Standard Method of Test for
Determination of Asphalt Binder
Content for Asphalt Paving
Mixtures by the Ignition Oven
$ each $160.00 $0.00
Aggregate Sieve Analysis SC-T-4
Standard Method of Test for
Sieve Analysis of Fine and
Coarse Aggregates
$ each $140.00 $0.00
PLM asbestos Bulk Sample
Analysis EPA 600
Method for the Determination of
Asbestos in Bulk Building
Materials
$ each $13.50 $0.00
TEM Asbestos Bulk Sample
Analysis ASTM D 6281
Standard Test Method for
Airborne Asbestos
Concentration in Ambient and
Indoor Atmospheres as
Determined by Transmission
Electron Microscopy Direct
Transfer (TEM)
$ each $75.00 $0.00
XRF Analysis of Lead
Per SCDHEC
Regulatory
Requirements
Determining Lead Content $ per day $440.00 $0.00
Total Lead Analysis
Per SCDHEC
Regulatory
Requirements
Determining Lead Content $ each $22.50 $0.00
SUBTOTAL = $5,752.50% of TOTAL = 20.18
Hourly Rate
Schedule Pay Unit Quantity Unit Rates Total Cost
Senior Principal $ per hour $375.00 $0.00
Principal/Project Manager $ per hour $300.00 $0.00
Senior Geotechnical Engineer $ per hour 4 $250.00 $1,000.00
Geotechnical Engineer $ per hour 20 $175.00 $3,500.00
Junior Geotechnical
Professional $ per hour 5 $130.00 $650.00
Project Geologist $ per hour 8 $130.00 $1,040.00
Engineering Technician $ per hour $120.00 $0.00
Senior Environmental
Specialist $ per hour $175.00 $0.00
Environmental Specialist $ per hour $120.00 $0.00
Graphics Designer $ per hour 6 $110.00 $660.00
Administrative Assistant $ per hour 4 $100.00 $400.00
Lodging $ per day 6 $250.00 $1,500.00
Meals $ per day 6 $70.00 $420.00
Travel $ per mile 156.5 $0.70 $109.55
Outside Services Associated
with Field and Laboratory
Work
AASHTO/ASTM
Applicable AASHTO or ASTM
procedure and manufacturer's
instruction for equipment in use.
Double Ring
Infiltrometer 4 $1,900.00 $7,600.00
SUBTOTAL = $16,879.55
% of TOTAL = 59.23
GRAND TOTAL = $28,500.05 0
Page 135 of 430
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
RECOMMEND APPROVAL TO FUND DUE DILIGENCE AND NEGOTIATE TERMS OF ACQUISITION FOR THE GREEN
SPACE PROGRAM APPLICATION: RLC PROPERTIES TRACT.
MEETING NAME AND DATE:
County Council November 9, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Motion to approve, modify, or deny the recommendations of the Green Space Advisory Committee.
PRESENTER INFORMATION:
Mr. Mike McShane, Chair of Green Space Advisory Committee & Mr. Mark Davis, Green Space Program
Manager (5 minutes)
ITEM BACKGROUND:
During their Oct. 16, 2026 meeting, the Green Space Advisory Committee (GSAC) reviewed a new Corridor
Protection Application: RLC Properties Tract, Lady’s Island; Political Jurisdiction – Unincorporated Beaufort
County; Geographic Region – Eastern, and recommended pursuing due diligence and negotiations.
FISCAL IMPACT:
$15,000 from the Green Space Program Fund Account #4706. Fund balance as of October 9, 2026 –
$91,431,688.
APPROVAL HISTORY:
N/A
Page 136 of 430
Page 137 of 430
Page 138 of 430
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
2026/50: AN ORDINANCE TO AMEND BEAUFORT COUNTY'S BUDGET ORDINANCE FOR FISCAL YEAR 2027
(ORDINANCE NO. 2026/29) TO AMEND SECTION III, COUNTY OPERATIONS REVENUES, AND SECTION IV,
COUNTY OPERATIONS APPROPRIATIONS TO APPROPRIATE FUND BALANCE FOR BEAUFORT COUNTY REGIONS
TOURNAMENT COMPLEX.
THE VOTE AT FINANCE, ADMINISTRATION, AND ECONOMIC DEVELOPMENT COMMITTEE ON SEPTEMBER 21,
2026 - FAILED 5:5
THE VOTE AT FIRST READING ON OCTOBER 12, 2026 - 7:4
THE VOTE AT SECOND READING AND PUBLIC HEARING ON OCTOBER 26, 2026 - 9:2
MEETING NAME AND DATE:
County Council November 9, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Committee approve ordinance and forward to County Council for First Reading.
PRESENTER INFORMATION:
Sandy Novak, 5 Minutes
ITEM BACKGROUND:
Beaufort County has identified an unappropriated fund balance of $9,788,000 in Local Accommodation Tax
(Fund 2001) and an unappropriated fund balance of $8,842,000 in Local Hospitality Tax (Fund 2002). The
County has indicated an interest in developing a Regional Tournament Complex and hereby appropriates
$15,000,000 of fund balance ($7,500,000 from Local Accommodation Tax) and ($7,500,000 from Local
Hospitality Tax) to develop and construct a Regional Tournament Complex.
FISCAL IMPACT:
$15,000,000; $7,500,000 from Local Accommodation Tax Fund Balance and $7,500,000 from Local Hospitality
Tax Fund Balance.
APPROVAL HISTORY:
The vote at Finance, Administration, and Economic Development Committee on September 21, 2026 - Failed
5:5
Page 139 of 430
ORDINANCE 2026/____
AN ORDINANCE TO AMEND BEAUFORT COUNTY’S BUDGET ORDINANCE FOR
FISCAL YEAR 2027 (ORDINANCE NO. 2026/29) TO AMEND SECTION III, COUNTY
OPERATIONS REVENUES, AND SECTION IV, COUNTY OPERATIONS
APPROPRIATION TO APPROPRIATE FUND BALANCE FOR BEAUFORT COUNTY
REGIONS TOURNAMENT COMPLEX
WHEREAS, the Beaufort County Council, pursuant to the authority granted by the
Constitution of the State of South Carolina and the General Assembly of the State of South
Carolina, has the authority to prepare an annual budget for all Beaufort County Departments,
Agencies, Elected Officials, Boards and Commissions; and
WHEREAS, Beaufort County Council adopted Ordinance 2026/29 on June 22, 2026,
which set the County’s FY2027 budget and associated expenditures; and
WHEREAS, the County has identified unappropriated fund balance of $9,788,000 in
Local Accommodation Tax (Fund 2001) and unappropriated fund balance of $8,842,000 in Local
Hospitality Tax (Fund 2002); and
WHEREAS, the County desires to develop a Regional Tournament Complex; and
WHEREAS, the County desires to appropriate $15,000,000 of fund balance ($7,500,000
from Local Accommodation Tax and $7,500,000 from Local Hospitality Tax) to be used towards
the design and construction of a Regional Tournament Complex; and
WHEREAS, the impact of this budget amendment is to increase FY2027 budget by
$15,000,000 to be used towards the design and construction of a Regional Tournament Complex
without disrupting approved projects in these funds and without depleting said funds; and
WHEREAS, in order to preserve funds for this multi-year project in the interest of good
accounting practices and transparency in the budget process, it is beneficial and necessary to
amend the budget to reflect the changes as set forth herein.
NOW, THEREFORE, BE IT ORDAINED BY BEAUFORT COUNTY COUNCIL
that the FY2027 Beaufort County Budget Ordinance 2026/29 is hereby amended as
follows:
SECTION III. COUNTY OPERATIONS REVENUES
A. Local Accommodation Tax. ATax revenues are amended to recognize and appropriate
$7,500,000 from fund balance to be used towards the design and construction of a Regional
Tournament Complex.
B. Local Hospitality Tax. HTax revenues are amended to recognize and appropriate
$7,500,000 from fund balance to be used towards the design and construction of a Regional
Tournament Complex.
The details of line-item accounts for these funds are hereby adopted as part of this Ordinance.
Page 140 of 430
SECTION IV. COUNTY OPERATIONS APPROPRIATION
A. Local Accommodation Tax Fund (Fund 2001) is increased by $7,500,000 from fund
balance to be used towards the design and construction of a Regional Tournament
Complex.
B. Local Hospitality Tax Fund (Fund 2002) is increased by $7,500,000 from fund balance
to be used towards the design and construction of a Regional Tournament Complex.
Done this ___ day of __________ 2026.
COUNTY COUNCIL OF BEAUFORT COUNTY
By: ___________________________________
Alice Howard, Chairman
ATTEST:
________________________
Sarah Brock, Clerk to Council
First Reading:
Public Reading:
Second Reading:
Third Reading:
Page 141 of 430
BEAUFORT COUNTY
COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
2026/54: AN ORDINANCE AUTHORIZING THE EXECUTION AND DELIVERY OF AN AGREEMENT GOVERNING A
NEW MULTI-COUNTY PARK BY AND BETWEEN BEAUFORT COUNTY, SOUTH CAROLINA AND JASPER COUNTY,
SOUTH CAROLINA; AUTHORIZING THE INCLUSION OF CERTAIN PROPERTY LOCATED IN BEAUFORT COUNTY IN
THE MULTI-COUNTY PARK; PROVIDING FOR THE DISTRIBUTION OF MULTI-COUNTY PARK REVENUES;
AUTHORIZING THE EXECUTION OF AN INTERGOVERNMENTAL AGREEMENT WITH THE TOWN OF PORT ROYAL;
AMENDING A PRIOR MASTER PARK AGREEMENT TO REMOVE CERTAIN PROPERTY LOCATED WITHIN THE
CORPORATE LIMITS OF THE TOWN OF PORT ROYAL; AND OTHER RELATED MATTERS. (PUBLIC HEARING)
THE VOTE AT FINANCE, ADMINISTRATION, AND ECONOMIC DEVELOPMENT COMMITTEE, ON OCTOBER 19,
2026 - 6:3
THE VOTE AT FIRST READING ON OCTOBER 26, 2026 - 8:2:1
MEETING NAME AND DATE:
County Council November 9, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of the proposed ordinance authorizing the creation of the new multi-county
industrial and business park, known as the Port Royal Business Park (“MCIP”), approval of the related Master
Park Agreement and Intergovernmental Agreement, and authorization of the associated redevelopment
financing framework for the former State Port property.
Staff believes the proposed MCIP framework provides an effective means of supporting long-term
redevelopment efforts while leveraging future fee-in-lieu-of-tax (“FILOT”) revenues generated from private
investment within the MCIP to fund eligible public improvements. The proposed redevelopment and
infrastructure investments are anticipated to support economic development, public access, tourism,
waterfront activation, transportation connectivity, utility infrastructure, recreational amenities, and other
public benefits within the Town and surrounding community.
PRESENTER INFORMATION:
Lawrence Flynn, Pope Flynn, LLC – Bond Counsel to Town, and Kevin Phillips, Mayor
ITEM BACKGROUND:
This item came before the Finance, Administration, and Economic Development Committee for a
consideration of Port Royal Business Park. The committee voted 6:3 to bring this forward to Council.
FISCAL IMPACT:
Town requests $10,000,000 in funding approval payable in increments of not exceeding $1mm for a period
lasting until the earlier of (i) 20 years, or (ii) full funding of the $10,000,000. Based on proportional millage,
this represents 55.25% School District ($5.525mm), 20.25% County ($2.025mm), and 24.5% Town ($2.45mm).
Page 142 of 430
APPROVAL HISTORY:
The vote at Finance, Administration, and Economic Development Committee on October 19, 2026 - 6:3
Page 143 of 430
1
STATE OF SOUTH CAROLINA
COUNTY COUNCIL FOR BEAUFORT COUNTY
ORDINANCE NO.
AN ORDINANCE AUTHORIZING THE EXECUTION AND
DELIVERY OF AN AGREEMENT GOVERNING A NEW MULTI-
COUNTY PARK BY AND BETWEEN BEAUFORT COUNTY,
SOUTH CAROLINA AND JASPER COUNTY, SOUTH CAROLINA;
AUTHORIZING THE INCLUSION OF CERTAIN PROPERTY
LOCATED IN BEAUFORT COUNTY IN THE MULTI-COUNTY
PARK; PROVIDING FOR THE DISTRIBUTION OF MULTI-
COUNTY PARK REVENUES; AUTHORIZING THE EXECUTION
OF AN INTERGOVERNMENTAL AGREEMENT WITH THE TOWN
OF PORT ROYAL; AMENDING A PRIOR MASTER PARK
AGREEMENT TO REMOVE CERTAIN PROPERTY LOCATED
WITHIN THE CORPORATE LIMITS OF THE TOWN OF PORT
ROYAL; AND OTHER RELATED MATTERS
WHEREAS, Beaufort County, South Carolina (the “County”), acting by and through its County
Council (“County Council”), is authorized pursuant to the provisions of Article VIII, Section 13(D) of the
Constitution of the State of South Carolina 1895, as amended and the provisions of Title 4, Chapter 1 of
the Code of Laws of South Carolina 1976, as amended (collectively, “MCIP Law”), to (i) develop a
multicounty Industrial/Business park with a county having contiguous border with the County; and (ii)
include property in the multicounty park, which inclusion under the terms of the MCIP Law (A) makes
such property exempt from ad valorem property taxes, and (B) changes the character of the annual
receipts from such property to fees-in-lieu of ad valorem property taxes in an amount equal to the ad
valorem property taxes that would have been due and payable but for the location of the property in such
multicounty park (“Fee Payments”).
WHEREAS, the County wishes to create a new multi-county Industrial/Business park (the “Park”)
pursuant to an agreement with Jasper County, South Carolina (“Jasper County” and together with the
County, the “Counties”) entitled “Master Agreement Governing the Port Royal Business Park”, in the
form attached hereto as Exhibit A (the “Park Agreement”).
WHEREAS, the provisions of the Park Agreement shall govern the operation of the Park, including
the sharing of expenses and revenues of the Park, and the manner in which the revenue is to be distributed
to each of the taxing entities within each of the Counties.
WHEREAS, the Counties previously created a multi-county industrial/business park (the “Existing
Park”), which was amended by the County pursuant to Ordinance No. 2009-16 dated April 13, 2009
(“2009 Ordinance”) in order to add and include certain property within the Town of Port Royal, South
Carolina (the “Town”)1 as more particularly shown on Exhibit B hereto (the “Prior MCIP Property”).
WHEREAS, Section 4-1-170(C) of the MCIP Law requires counties creating a multi-county
Industrial/Business park to obtain the consent of any affected municipality prior to the creation of such
park whenever the proposed park encompasses all or a portion of the municipality.
1 Also approved by the Town pursuant to Ordinance 2009-3 dated May 13, 2009.
Page 144 of 430
2
WHEREAS, the Town initiated the request to form the Park, and has further requested that all of the
Prior MCIP Property be removed from the Existing Park and thereafter incorporated into the Park
authorized and created hereunder as further shown and described on Exhibit C attached hereto (the “Park
Property”).
WHEREAS, through the creation of the Park, the Park Property shall be exempt from ad valorem
property taxes, and the character of the annual receipts from the Park Property shall be changed to Fee
Payments in an amount equivalent to the ad valorem taxes that would have been due and payable but for
the location of the Park Property in the Park.
WHEREAS, pursuant to the authority of the MCIP Law and the decision of the Supreme Court in
Horry County School District v. Horry County, 346 S.C. 621 (2001), the Town has further requested, in
order to assist the Town in paying for the costs of certain projects, that the County distribute a portion of
the Fee Payments to the Town in an amount greater than the Town’s proportionate share of the tax levy
applicable to the Park Property had it not been located in the Park.
WHEREAS, it is the County’s intention, by and through the enactment of this ordinance and the
companion ordinance of Jasper County, to (i) create the Park, and include all of the Park Property therein,
(ii) amend the Existing Park to remove the Prior MCIP Property; (iii) provide for the distribution of Fee
Payments; and (iv) approve an Intergovernmental Agreement between the County and the Town (the
“IGA”), the form of which is attached hereto as Exhibit D, evidencing the Town’s consent to the creation
of the Park and setting forth the conditions under which such consent is provided, including the
methodology for distribution of Fee Payments.
NOW, THEREFORE, BE IT ORDAINED BY THE BEAUFORT COUNTY COUNCIL:
Section 1. Development of Park; Execution of Master Agreement. The creation of the Park and the
execution and delivery of the Park Agreement are hereby authorized and approved. The form, terms, and
provisions of the Park Agreement are likewise approved, subject to such revisions, additions, or
modifications as are not materially adverse to the County and as may be approved by the County
Administrator of the County (the “Administrator”) following consultation with legal counsel. The Chair
of County Council (the “Chair”) is authorized and directed to execute the Park Agreement on behalf of
the County, and the Clerk to County Council (the “Clerk”) is authorized to attest the same. The Chair and
the Administrator are further authorized and directed to take all such additional actions and execute and
deliver all such additional documents as may be necessary or advisable to carry out the intent of this
Ordinance, complete the delivery of the Park Agreement, and consummate the transactions and
undertakings contemplated therein, including delivery of the Park Agreement to Jasper County. Any
actions previously taken by County officials in connection with the authorization, negotiation, or approval
of the Park Agreement and the matters contemplated therein are hereby ratified and confirmed. The
businesses or industries located within the Park shall make Fee Payments in lieu of ad valorem property
taxes in the manner provided by applicable law and the terms and conditions of the Park Agreement.
Section 2. Inclusion of Property; Removal of Prior MCIP Property. The Park’s boundaries shall
initially include the Park Property, as shown on Exhibit C hereto and otherwise described as Exhibit A to
the Park Agreement. The Chair, the Administrator and the Clerk are hereby authorized to take such
further actions as may be necessary to include the Park Property in the Park’s boundaries, including all
necessary notification to the County’s auditor and treasurer. Pursuant to the terms of the Park Agreement,
the location of the Park Property in the Park is complete upon (i) the enactment of this Ordinance by
County Council and a companion ordinance by the Jasper County Council and (ii) the delivery by the
County of a description of the Park Property to Jasper County. Simultaneously with the foregoing and
following the enactment of this Ordinance, the Existing Park, and any master agreement related thereto,
Page 145 of 430
3
shall be automatically amended and revised as necessary to ensure the removal of the Prior MCIP
Property therefrom; such removal shall be fully effectuated upon the fully execution and delivery of the
Park Agreement by the County and Jasper County.
Section 3. Distribution of Fee Payments in the County. With respect to properties located in the
County portion of the Park, the Fee Payments shall be paid to the Treasurer of Beaufort County (the
“Treasurer”). Any portion of the Fee Payments allocated to Jasper County pursuant to the Park
Agreement shall be thereafter paid by the Treasurer to the Treasurer of Jasper County within ten (10)
business days of receipt for distribution in accordance with the terms of the Park Agreement. Revenues
generated from industries or businesses located in the County portion of the Park and to be retained by
County pursuant to the Park Agreement shall be distributed within the County in accordance with the
terms of the Park Agreement and the IGA, respectively.
Section 4. Intergovernmental Agreement. The County is hereby authorized to enter into the IGA
with the Town for the purpose of establishing the terms and conditions under which the County shall
distribute to the Town a portion of the Fee Payments generated by the Park Property in an amount greater
than the Town’s otherwise applicable proportionate share of the ad valorem tax levy that would have
applied to the Park Property had the Park Property not been located within the Park. Such additional
distributions are intended to assist the Town in funding or reimbursing the costs of the improvements
identified in the IGA. The form, terms, and provisions of the IGA are hereby approved, subject to such
revisions, additions, or modifications as are not materially adverse to the County and as may be approved
by the Administrator following consultation with legal counsel. The Chair is authorized and directed to
execute the IGA on behalf of the County, the Clerk is authorized to attest the same, and the Administrator
is authorized and directed to deliver the executed IGA to the Town and to take such further actions as
may be necessary or advisable to carry out the intent of the IGA and consummate the transactions
contemplated therein.
Section 5. Further Assurances. The Chair, the Clerk and the Administrator (or their respective
designees) are authorized to execute whatever other documents and take whatever further actions as may
be necessary to effect the intent of this Ordinance.
Section 6. Severability. If any part of this Ordinance is unenforceable, the remainder is unaffected.
Section 7. General Repealer. Any ordinance, resolution or order, the terms of which conflict with
this Ordinance, is repealed, expressly including the 2009 Ordinance.
Section 8. Effective Date. This Ordinance is effective after third and final reading.
[Remainder of Page Intentionally Left Blank]
Page 146 of 430
4
DONE AND ORDAINED THIS 14 th day of December 2026.
BEAUFORT COUNTY, SOUTH CAROLINA
Chair, County Council
(SEAL)
ATTEST:
Clerk to County Council
Beaufort County, South Carolina
READINGS:
First Reading: October 26, 2026
Second Reading: November 9, 2026
Public Hearing: November 9, 2026
Third Reading: December 14, 2026
Page 147 of 430
PPAB 3216107V3
EXHIBIT A
FORM OF MASTER AGREEMENT
Page 148 of 430
PPAB 3216107V3
EXHIBIT B
PRIOR MCIP PROPERTY
Page 149 of 430
PPAB 3216107V3
EXHIBIT C
PARK PROPERTY
Parcel Tax Map Number
1 R113 010 000 0075 0000
2 R110 010 000 0042A 0000
3 R110 010 000 0042 0000
4 R110 010 000 0360 0000
5 R113 010 000 0377 0000
6 R113 010 000 0375 0000
7 R113 010 000 0374 0000
8 R113 010 000 0366 0000
9 R113 010 000 0373 0000
10 R113 010 000 0372 0000
11 R113 010 000 0367 0000
12 R113 010 000 0447 0000
13 R113 010 000 0371 0000
14 R113 011 000 0449 0000
15 R110 010 000 0075 0000
16 R113 010 000 0392 0000
17 R110 010 000 077C 0000
18 R110 010 000 077A 0000
19 R110 010 000 077B 0000
20 R110 011 000 0249 0000
21 R110 010 000 0084 0000
22 R110 010 000 084A 0000
23 R113 010 000 0326 0000
24 R113 010 000 0327 0000
25 R113 010 000 0328 0000
26 R110 010 000 0329 0000
27 R110 010 000 0330 0000
28 R110 010 000 0262 0000
29 R113 011 000 0450 0000
30 R110 010 000 0080 0000
Page 150 of 430
PPAB 3216107V3
EXHIBIT D
FORM OF INTERGOVERNMENTAL AGREEMENT
Page 151 of 430
Port Royal Business Park
Town of Port Royal
October 26, 2026
Page 152 of 430
2
What is a MCIP?
A Multi-County Business/Industrial Park (“MCIP”)
is a special designation under South Carolina law
that allows two or more counties to jointly designate
land for industrial or commercial development.
Despite the name, the park does not have to span
multiple counties geographically—only one county
may host the property, but another county must
participate in the agreement.
Page 153 of 430
Why are MCIPs used?
MCIPs are primarily used as a financial incentive tool to attract
and retain businesses.
They allow counties to:
- Offer Fee in Lieu of Taxes (FILOT) agreements
- Redistribute tax revenue for infrastructure and development
- Support job creation and private investment
Is There an Actual Park?
They are not physical parks, but rather legal and financial
designations on paper that allow counties to apply flexible
financing mechanisms to support economic development.
Page 154 of 430
Key Benefits of MCIPs:
Fee in Lieu of Taxes (FILOT): FILOTs are only allowed if the
project is located in a designated MCIP.
Revenue Sharing Between Counties: The host county typically
keeps 99% of the revenue, while the partner county receives 1% as
a symbolic share to meet legal requirements.
Special Source Revenue Credits (SSRCs): Credits may be applied
to reduce FILOT payments as an offset against infrastructure costs.
Infrastructure Funding: Counties can use a portion of the tax
revenue generated within an MCIP to fund public infrastructure
(roads, water/sewer, broadband) that supports the development.
Page 155 of 430
Seaport Redevelopment Plan TIF History
5
- TIF Created by Ordinance No. 2011-23
- Approved Redevelopment Plan dated 2/8/12
- 20 Year Term (2012-2032)
- Assumed a $19.5mm sale (initial A V of $1,165,500)
- Beaufort County participates at 100%
- BCSD agrees to participate at maximum of $300k/yr
- Lesser of (i) $300k/yr or (ii) 50% of annual debt service
- SC Ports Authority retained ownership until September 2017
- No tax revenue generated from 2012-2017
- Property sells for $9.05mm in September 2017 to Grey Ghost
- Town spends $1mm+ of insurance proceeds for roads/parking
(mainly for Fishcamp)
- However, property assessed at $7,031,666 for TY2018
- Initial TIF taxes of $115,216.66
- Grey Ghost delinquent for initial 2018 taxes
- Property sells to Safe Harbor for $20.5mm in December 2021
(weirdly – only on 2025 tax rolls at $11.9mm)
- Total Value (as of 10/31/25) of $23.052mm (A V of $1.383mm)
- TY2024 collections of $403,323.54
- Set for Termination: 2026
Page 156 of 430
Redevelopment
Area – 320 Acres
6
Page 157 of 430
7
Updated Regulating Plan
Page 158 of 430
8
Updated Regulating Plan
Page 159 of 430
Proposed Projects – Capped At $10mm
- Public parks, greenspaces, recreational amenities, trails, boardwalks, and gathering spaces.
- Sidewalk, streetscape, roadway, bicycle, pedestrian, and ADA accessibility improvements.
- Waterfront access, stabilization, marina, and shoreline enhancement projects.
- Improvements and expansions associated with the Spanish Moss Trail and related trail systems.
- Water, sewer, stormwater, drainage, flood mitigation, resiliency, utility, and related infrastructure
improvements.
- Public docks, piers, marinas, boat landings, and maritime or working waterfront support facilities.
- Seafood, shrimping, fishing, and commercial waterfront infrastructure and support facilities.
- Public parking, transit, electric vehicle, roadway, and transportation-related improvements.
- Landscaping, beautification, lighting, public art, gateway, and aesthetic enhancement
improvements.
- Environmental remediation, demolition, dredging, grading, site preparation, and redevelopment
activities.
- Public safety, emergency access, municipal service, and governmental support infrastructure.
- Any other public infrastructure, capital improvements, or redevelopment-related improvements
determined necessary or desirable by the Town.
Page 160 of 430
10
Updated Regulating Plan
Page 161 of 430
11
Entity Millage $1,383,140 x Millage
Town 72 mills $99,586
Schools 162.4 mills $224,622
County 57.3 mills $79,254
Other 2.2 mills $3,043
Total 293.9 mills $406,505
Taxes for 2025*
- Based on Current A V of $1,383,140
_________________
* Actual Collections: $403,323.54
Page 162 of 430
12
All Collections Since SPA Sale of Property
Page 163 of 430
13
Anticipated Distribution
Page 164 of 430
Anticipated Next Steps:
1. BC Finance Committee – Positive Recommendation on
10/19
2. Ordinances Approving MCIP
- Beaufort; Jasper; and Port Royal
- County Schedule: 10/26, 11/9, and 12/14
- Initial Contact already made with Jasper County
3. Execute/Deliver Master Agreement
4. Execute/Deliver IGA
5. Bonds Issued for Public Projects
14
Page 165 of 430
BEAUFORT COUNTY COUNCIL
AGENDA ITEM SUMMARY
ITEM TITLE:
Consideration of Port Royal Business Park
MEETING NAME AND DATE:
Finance, Administration and Economic Development Committee– May 18, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of the proposed ordinance authorizing the creation of the new multi-county
industrial and business park, known as the Port Royal Business Park (“MCIP”), approval of the related Master
Park Agreement and Intergovernmental Agreement, and authorization of the associated redevelopment
financing framework for the former State Port property.
Staff believes the proposed MCIP framework provides an effective means of supporting long-term
redevelopment efforts while leveraging future fee-in-lieu-of-tax (“FILOT”) revenues generated from private
investment within the MCIP to fund eligible public improvements. The proposed redevelopment and
infrastructure investments are anticipated to support economic development, public access, tourism,
waterfront activation, transportation connectivity, utility infrastructure, recreational amenities, and other
public benefits within the Town and surrounding community.
Accordingly, staff recommends Finance Committee approval, and full recommendation of approval to County
Council.
PRESENTER INFORMATION:
Lawrence Flynn, Pope Flynn, LLC – Bond Counsel to Town
Van Willis, Town Manager
Kevin Phillips, Mayor
ITEM BACKGROUND
The proposed ordinance authorizes the creation of a new MCIP to support the redevelopment of the former
State Port property within the Town, which is now owned by Safe Harbor Marinas (purchased in 2021). The
MCIP is intended to serve as an alternative funding mechanism for public infrastructure, redevelopment
improvements, and related project costs associated with the redevelopment of the former port property and
surrounding areas.
The proposed MCIP will replace the tax increment financing (“TIF”) district previously approved by the County
and the School District in 2012. Although the TIF district was established to support redevelopment of the
property, it was never utilized due to delays in the project’s development and implementation. In light of the
current redevelopment framework and ownership structure, the Town believes that an MCIP structure
provides a more effective and flexible mechanism for funding eligible public improvements and facilitating
long-term redevelopment efforts.
The ordinance will also amend and supersede the County’s prior MCIP arrangement approved in 2009 relating
to the former port property. The new MCIP is intended to update and consolidate prior redevelopment
Page 166 of 430
financing structures into a single, modernized framework that reflects the current redevelopment plans for
the property and anticipated future investment in the area.
Under the proposed structure, FILOT revenues generated by development within the MCIP may be used to
fund or reimburse the costs of certain public infrastructure and redevelopment improvements identified by
the Town and County. As further described in Exhibit B to the IGA, the proposed improvements may include
parks and recreational facilities, waterfront and trail improvements, utility infrastructure, transportation and
parking improvements, public access facilities, landscaping, and other redevelopment-related infrastructure
necessary to support the project and surrounding community.
FISCAL IMPACT:
Town requests $10,000,000 in funding approval payable in increments of not exceeding $1mm for a period
lasting until the earlier of (i) 20 years, or (ii) full funding of the $10,000,000. Based on proportional millage,
this represents 55.25% School District ($5.525mm), 20.25% County ($2.025mm), and 24.5% Town ($2.45mm).
APPROVAL HISTORY:
n/a
Page 167 of 430
1
STATE OF SOUTH CAROLINA
COUNTY COUNCIL FOR BEAUFORT COUNTY
ORDINANCE NO.
AN ORDINANCE AUTHORIZING THE EXECUTION AND
DELIVERY OF AN AGREEMENT GOVERNING A NEW MULTI-
COUNTY PARK BY AND BETWEEN BEAUFORT COUNTY,
SOUTH CAROLINA AND JASPER COUNTY, SOUTH CAROLINA;
AUTHORIZING THE INCLUSION OF CERTAIN PROPERTY
LOCATED IN BEAUFORT COUNTY IN THE MULTI-COUNTY
PARK; PROVIDING FOR THE DISTRIBUTION OF MULTI-
COUNTY PARK REVENUES; AUTHORIZING THE EXECUTION
OF AN INTERGOVERNMENTAL AGREEMENT WITH THE TOWN
OF PORT ROYAL; AMENDING A PRIOR MASTER PARK
AGREEMENT TO REMOVE CERTAIN PROPERTY LOCATED
WITHIN THE CORPORATE LIMITS OF THE TOWN OF PORT
ROYAL; AND OTHER RELATED MATTERS
WHEREAS, Beaufort County, South Carolina (the “County”), acting by and through its County
Council (“County Council”), is authorized pursuant to the provisions of Article VIII, Section 13(D) of the
Constitution of the State of South Carolina 1895, as amended and the provisions of Title 4, Chapter 1 of
the Code of Laws of South Carolina 1976, as amended (collectively, “MCIP Law”), to (i) develop a
multicounty Industrial/Business park with a county having contiguous border with the County; and (ii)
include property in the multicounty park, which inclusion under the terms of the MCIP Law (A) makes
such property exempt from ad valorem property taxes, and (B) changes the character of the annual
receipts from such property to fees-in-lieu of ad valorem property taxes in an amount equal to the ad
valorem property taxes that would have been due and payable but for the location of the property in such
multicounty park (“Fee Payments”).
WHEREAS, the County wishes to create a new multi-county Industrial/Business park (the “Park”)
pursuant to an agreement with Jasper County, South Carolina (“Jasper County” and together with the
County, the “Counties”) entitled “Master Agreement Governing the Port Royal Business Park”, in the
form attached hereto as Exhibit A (the “Park Agreement”).
WHEREAS, the provisions of the Park Agreement shall govern the operation of the Park, including
the sharing of expenses and revenues of the Park, and the manner in which the revenue is to be distributed
to each of the taxing entities within each of the Counties.
WHEREAS, the Counties previously created a multi-county Industrial/Business park known as
[NAME] (the “Existing Park”), which was amended by the County pursuant to Ordinance No. 2009-16
dated April 13, 2009 (“2009 Ordinance”) in order to add and include certain property within the Town of
Port Royal, South Carolina (the “Town”) 1 as more particularly shown on Exhibit B hereto (the “Prior
MCIP Property”).
WHERAS, Section 4-1-170(C) of the MCIP Law requires counties creating a multi-county
Industrial/Business park to obtain the consent of any affected municipality prior to the creation of such
park whenever the proposed park encompasses all or a portion of the municipality.
1 Also approved by the Town pursuant to Ordinance 2009-3 dated May 13, 2009.
Page 168 of 430
2
WHEREAS, the Town initiated the request to form the Park, and has further requested that some or
all of the Prior MCIP Property be removed from the Existing Park and thereafter incorporated into the
Park authorized and created hereunder as further shown and described on Exhibit C attached hereto (the
“Park Property”).
WHEREAS, through the creation of the Park, the Park Property shall be exempt from ad valorem
property taxes, and the character of the annual receipts from the Park Property shall be changed to Fee
Payments in an amount equivalent to the ad valorem taxes that would have been due and payable but for
the location of the Park Property in the Park.
WHEREAS, pursuant to the authority of the MCIP Law and the decision of the Supreme Court in
Horry County School District v. Horry County, 346 S.C. 621 (2001), the Town has further requested, in
order to assist the Town in paying for the costs of certain projects, that the County distribute a portion of
the Fee Payments to the Town in an amount greater than the Town’s proportionate share of the tax levy
applicable to the Park Property had it not been located in the Park.
WHEREAS, is the County’s intention, by and through the enactment of this ordinance and the
companion ordinance of Jasper County, to (i) create the Park, and include all of the Park Property therein,
(ii) amend the Existing Park to remove the Prior MCIP Property; (iii) provide for the distribution of Fee
Payments; and (iv) approve an Intergovernmental Agreement between the County and the Town (the
“IGA”), the form of which is attached hereto as Exhibit D, evidencing the Town’s consent to the creation
of the Park and setting forth the conditions under which such consent is provided, including the
methodology for distribution of Fee Payments.
NOW, THEREFORE, BE IT ORDAINED BY THE BEAUFORT COUNTY COUNCIL:
Section 1. Development of Park; Execution of Master Agreement. The creation of the Park and the
execution and delivery of the Park Agreement are hereby authorized and approved. The form, terms, and
provisions of the Park Agreement are likewise approved, subject to such revisions, additions, or
modifications as are not materially adverse to the County and as may be approved by the County
Administrator of the County (the “Administrator”) following consultation with legal counsel. The Chair
of County Council (the “Chair”) is authorized and directed to execute the Park Agreement on behalf of
the County, and the Clerk to County Council (the “Clerk”) is authorized to attest the same. The Chair and
the Administrator are further authorized and directed to take all such additional actions and execute and
deliver all such additional documents as may be necessary or advisable to carry out the intent of this
Ordinance, complete the delivery of the Park Agreement, and consummate the transactions and
undertakings contemplated therein, including delivery of the Park Agreement to Jasper County. Any
actions previously taken by County officials in connection with the authorization, negotiation, or approval
of the Park Agreement and the matters contemplated therein are hereby ratified and confirmed. The
businesses or industries located within the Park shall make Fee Payments in lieu of ad valorem property
taxes in the manner provided by applicable law and the terms and conditions of the Park Agreement.
Section 2. Inclusion of Property; Removal of Prior MCIP Property. The Park’s boundaries shall
initially include the Park Property, as shown on Exhibit C hereto and other described as Exhibit A to the
Park Agreement. The Chair, the Administrator and the Clerk are hereby authorized to take such further
actions as may be necessary to include the Park Property in the Park’s boundaries, including all necessary
notification to the County’s auditor and treasurer. Pursuant to the terms of the Park Agreement, the
location of the Park Property in the Park is complete upon (i) the enactment of this Ordinance by County
Council and a companion ordinance by the Jasper County Council and (ii) the delivery by the County of a
description of the Park Property to Jasper County. Simultaneously with the foregoing and following the
enactment of this Ordinance, the Existing Park, and any master agreement related thereto, shall be
Page 169 of 430
3
automatically amended and revised as necessary to ensure the removal of the Prior MCIP Property
therefrom; such removal shall be fully effectuated upon the fully execution and delivery of the Park
Agreement by the County and Jasper County.
Section 3. Distribution of Fee Payments in the County. With respect to properties located in the
County portion of the Park, the Fee Payments shall be paid to the Treasurer of Beaufort County (the
“Treasurer”). Any portion of the Fee allocated to Jasper County pursuant to the Park Agreement shall be
thereafter paid by the Treasurer to the Treasurer of Jasper County within ten (10) business days of receipt
for distribution in accordance with the terms of the Park Agreement. Revenues generated from industries
or businesses located in the County portion of the Park and to be retained by County pursuant to the Park
Agreement shall be distributed within the County in accordance with the terms of the Park Agreement and
the IGA, respectively.
Section 4. Intergovernmental Agreement. The County is hereby authorized to enter into the IGA
with the Town for the purpose of establishing the terms and conditions under which the County shall
distribute to the Town a portion of the Fee Payments generated by the Park Property in an amount greater
than the Town’s otherwise applicable proportionate share of the ad valorem tax levy that would have
applied to the Park Property had the Park Property not been located within the Park. Such additional
distributions are intended to assist the Town in funding or reimbursing the costs of the improvements
identified in the IGA. The form, terms, and provisions of the IGA are hereby approved, subject to such
revisions, additions, or modifications as are not materially adverse to the County and as may be approved
by the Administrator following consultation with legal counsel. The Chair is authorized and directed to
execute the IGA on behalf of the County, the Clerk is authorized to attest the same, and the Administrator
is authorized and directed to deliver the executed IGA to the Town and to take such further actions as
may be necessary or advisable to carry out the intent of the IGA and consummate the transactions
contemplated therein.
Section 5. Further Assurances. The Chair, the Clerk and the Administrator (or their respective
designees) are authorized to execute whatever other documents and take whatever further actions as may
be necessary to effect the intent of this Ordinance.
Section 6. Severability. If any part of this Ordinance is unenforceable, the remainder is unaffected.
Section 7. General Repealer. Any ordinance, resolution or order, the terms of which conflict with
this Ordinance, is, only to the extent of that conflict, repealed, expressly including the 2009 Ordinance.
Section 8. Effective Date. This Ordinance is effective after third and final reading.
[Remainder of Page Intentionally Left Blank]
Page 170 of 430
4
BEAUFORT COUNTY, SOUTH CAROLINA
Chair, County Council
(SEAL)
ATTEST:
Clerk to County Council
Beaufort County, South Carolina
READINGS:
First Reading:
Second Reading:
Public Hearing:
Third Reading:
Page 171 of 430
PPAB 3216107V3
EXHIBIT A
FORM OF MASTER AGREEMENT
Page 172 of 430
PPAB 3216107V3
EXHIBIT B
PRIOR MCIP PROPERTY
Page 173 of 430
PPAB 3216107V3
EXHIBIT C
PARK PROPERTY
Page 174 of 430
PPAB 3216107V3
EXHIBIT D
FORM OF INTERGOVERNMENTAL AGREEMENT
Page 175 of 430
1
STATE OF SOUTH CAROLINA
COUNTY OF JASPER
Ordinance 2026-_____
AN ORDINANCE
OF JASPER COUNTY COUNCIL
AN ORDINANCE AUTHORIZING THE EXECUTION AND DELIVERY OF AN
AGREEMENT GOVERNING A NEW MULTI-COUNTY PARK BY AND
BETWEEN BEAUFORT COUNTY, SOUTH CAROLINA AND JASPER
COUNTY, SOUTH CAROLINA; AUTHORIZING THE INCLUSION OF
CERTAIN PROPERTY LOCATED IN BEAUFORT COUNTY IN THE MULTI-
COUNTY PARK; PROVIDING FOR THE DISTRIBUTION OF MULTI-
COUNTY PARK REVENUES; AUTHORIZING THE EXECUTION OF AN
INTERGOVERNMENTAL AGREEMENT WITH THE TOWN OF PORT
ROYAL; AMENDING A PRIOR MASTER PARK AGREEMENT TO REMOVE
CERTAIN PROPERTY LOCATED WITHIN THE CORPORATE LIMITS OF
THE TOWN OF PORT ROYAL; AND OTHER RELATED MATTERS
WHEREAS, Jasper County, South Carolina (“Jasper County”), acting by and
through its County Council (the “Jasper County Council”), is authorized pursuant to the
provisions of Article VIII, Section 13(D) of the Constitution of the State of South
Carolina 1895, as amended and the provisions of Title 4, Chapter 1 of the Code of Laws
of South Carolina, 1976, as amended (collectively, “MCIP Law”), to (i) develop a
multicounty Industrial/Business park with a county having a contiguous border with
Beaufort County, South Carolina (“Beaufort County” and together with Jasper County,
the “Counties”); and (ii) include property in the multicounty park, which inclusion
under the terms of the MCIP Law (A) makes such property exempt from ad valorem
property taxes, and (B) changes the character of the annual receipts from such property
to fees-in-lieu of ad valorem property taxes in an amount equal to the ad valorem
property taxes that would have been due and payable but for the location of the property
in such multicounty park (“Fee Payments”); and
WHEREAS, Jasper County wishes to create a new multi-county Industrial/Business
park (the “Park”) pursuant to an agreement with Beaufort County entitled “Master
Agreement Governing the Port Royal Business Park”, in the form attached hereto as
Exhibit A (the “Park Agreement”); and
WHEREAS, the provisions of the Park Agreement shall govern the operation of the
Park, including the sharing of expenses and revenues of the Park, and the manner in
which the revenue is to be distributed to each of the taxing entities within each of the
Counties; and
WHEREAS, the Counties previously created a multi-county Industrial/Business park
known as [NAME] (the “Existing Park”), which was amended with the approval of the
Page 176 of 430
2
Town of Port Royal, South Carolina (the “Town”), to include that property more
particularly shown on Exhibit B hereto (the “Prior MCIP Property”); and
WHERAS, Section 4-1-170(C) of the MCIP Law requires counties creating a multi-
county Industrial/Business park to obtain the consent of any affected municipality prior
to the creation of such park whenever the proposed park encompasses all or a portion of
the municipality; and
WHEREAS, the Town initiated the request to form the Park, and has further
requested that some or all of the Prior MCIP Property be removed from the Existing
Park and thereafter incorporated into the Park authorized and created hereunder as
further shown and described on Exhibit C attached hereto (the “Park Property”); and
WHEREAS, through the creation of the Park, the Park Property shall be exempt
from ad valorem property taxes, and the character of the annual receipts from the Park
Property shall be changed to Fee Payments in an amount equivalent to the ad valorem
taxes that would have been due and payable but for the location of the Park Property in
the Park; and
WHEREAS, it is Jasper County’s intention, by and through the enactment of this
ordinance and the companion ordinance of Beaufort County, to (i) create the Park, and
include all of the Park Property therein, (ii) amend the Existing Park to remove the Prior
MCIP Property; and (iii) provide for the distribution of Fee Payments.
NOW, THEREFORE, BE IT ORDAINED BY THE JASPER COUNTY COUNCIL:
Section 1. Development of Park; Execution of Master Agreement. The
creation of the Park and the execution and delivery of the Park Agreement are hereby
authorized and approved. The form, terms, and provisions of the Park Agreement are
likewise approved, subject to such revisions, additions, or modifications as are not
materially adverse to Jasper County and as may be approved by the County
Administrator of Jasper County, including any temporary or interim administrator (the
“Administrator”) following consultation with legal counsel. The Chair of County Council
(the “Chair”) is authorized and directed to execute the Park Agreement on behalf of
Jasper County, and the Clerk to County Council (the “Clerk”) is authorized to attest the
same. The Chair and the Administrator are further authorized and directed to take all
such additional actions and execute and deliver all such additional documents as may be
necessary or advisable to carry out the intent of this Ordinance, complete the delivery of
the Park Agreement, and consummate the transactions and undertakings contemplated
therein, including delivery of the Park Agreement to Beaufort County. Any actions
previously taken by County officials in connection with the authorization, negotiation, or
approval of the Park Agreement and the matters contemplated therein are hereby
ratified and confirmed. The businesses or industries located within the Park shall make
Fee Payments in lieu of ad valorem property taxes in the manner provided by applicable
law and the terms and conditions of the Park Agreement.
Page 177 of 430
3
Section 2. Inclusion of Property; Removal of Prior MCIP Property. The
Park’s boundaries shall initially include the Park Property, as shown on Exhibit C hereto
and other described as Exhibit A to the Park Agreement. The Chair, the Administrator
and the Clerk are hereby authorized to take such further actions as may be necessary to
include the Park Property in the Park’s boundaries, including all necessary notification
to Jasper County’s auditor and treasurer. Pursuant to the terms of the Park Agreement,
the location of the Park Property in the Park is complete upon (i) the enactment of this
Ordinance by County Council and a companion ordinance by Beaufort County Council
and (ii) the delivery by Jasper County of a description of the Park Property to Beaufort
County. Simultaneously with the foregoing and following the enactment of this
Ordinance, the Existing Park, and any master agreement related thereto, shall be
automatically amended and revised as necessary to ensure the removal of the Prior
MCIP Property therefrom; such removal shall be fully effectuated upon the fully
execution and delivery of the Park Agreement by Jasper County and Beaufort County.
Section 3. Distribution of Fee Payments in Jasper County. With respect
to properties located in Jasper County portion of the Park, the Fee Payments shall be
paid to the Treasurer of Jasper County (the “Treasurer”). Any portion of the Fee
Payments allocated to Beaufort County pursuant to the Park Agreement shall be
thereafter paid by the Treasurer to the Treasurer of Beaufort County within ten (10)
business days of receipt for distribution in accordance with the terms of the Park
Agreement. Revenues generated from industries or businesses located in Jasper County
portion of the Park and to be retained by County pursuant to the Park Agreement shall
be distributed within Jasper County in accordance with the terms of the Park
Agreement.
Section 4. Intergovernmental Agreement. Jasper County acknowledges and,
to the extent needed or necessary, approves Beaufort County entering into an
intergovernmental agreement with the Town related to the Park.
Section 5. Further Assurances. The Chair, the Clerk and the Administrator (or
their respective designees) are authorized to execute whatever other documents and
take whatever further actions as may be necessary to effect the intent of this Ordinance.
Section 6. Severability. If any part of this Ordinance is unenforceable, the
remainder is unaffected.
Section 7. General Repealer. Any ordinance, resolution or order, the terms of
which conflict with this Ordinance, is, only to the extent of that conflict, repealed.
Section 8. Effective Date. This Ordinance is effective after third and final
reading.
[Remainder of Page Intentionally Left Blank]
Page 178 of 430
4
JASPER COUNTY, SOUTH CAROLINA
________________________________
Joseph Rowell, Chairman
Jasper County Council
ATTEST:
________________________________
Wanda H. Giles, Clerk to Council
ORDINANCE: #2026-__
First Reading: ________, 2026
Second Reading: ________, 2026
Public Hearing: ________, 2026
Enactment: ________, 2026
Reviewed for form and draftsmanship by the interim Jasper County Attorney.
_________________________ ______________________
County Attorney Date
Page 179 of 430
EXHIBIT A
FORM OF MASTER AGREEMENT
Page 180 of 430
EXHIBIT B
PRIOR MCIP PROPERTY
Page 181 of 430
EXHIBIT C
PARK PROPERTY
Page 182 of 430
PPAB 3216107V3
ORDINANCE 2026-_
AN ORDINANCE TO APPROVE AND ASSIST IN THE
DEVELOPMENT OF A JOINTLY OWNED AND OPERATED
MULTI-COUNTY BUSINESS PARK WITH AND BETWEEN
BEAUFORT COUNTY AND JASPER COUNTY, SUCH PARK TO
BE GEOGRAPHICALLY LOCATED IN THE TOWN OF PORT
ROYAL AND ESTABLISHED PURSUANT TO SECTION 4-1-170
ET SEQ. OF THE CODE OF LAWS OF SOUTH CAROLINA 1976,
AS AMENDED; ACKNOWLEDGING THE DELIVERY OF AN
AGREEMENT GOVERNING THE MULTI-COUNTY PARK
BETWEEN BEAUFORT COUNTY AND JASPER COUNTY;
AUTHORIZING THE EXECUTION AND DELIVERY OF AN
INTERGOVERNMENTAL AGREEMENT WITH BEAUFORT
COUNTY; APPROVING THE AMENDMENT OF A PRIOR
MASTER PARK AGREEMENT TO REMOVE CERTAIN
PROPERTY LOCATED WITHIN THE CORPORATE LIMITS OF
THE TOWN OF PORT ROYAL; AND OTHER RELATED
MATTERS
WHEREAS, Beaufort County, South Carolina (the “County”), acting by and through its County
Council, is authorized pursuant to the provisions of Article VIII, Section 13(D) of the South Carolina
Constitution 1895, as amended and the provisions of Title 4, Chapter 1 of the Code of Laws of South
Carolina 1976, as amended (collectively, “MCIP Law”), to (i) develop a multicounty Industrial/Business
park with a county having contiguous border with the County; and (ii) include property in the multicounty
park, which inclusion under the terms of the MCIP Law (A) makes such property exempt from ad
valorem property taxes, and (B) changes the character of the annual receipts from such property to fees-
in-lieu of ad valorem property taxes in an amount equal to the ad valorem property taxes that would have
been due and payable but for the location of the property in such multicounty park (“Fee Payments”).
WHEREAS, the County plans to create a new multi-county Industrial/Business park (the “Park”)
pursuant to an agreement with Jasper County, South Carolina (“Jasper County” and together with the
County, the “Counties”) in the form attached hereto as Exhibit A (the “Park Agreement”).
WHEREAS, the provisions of the Park Agreement shall govern the operation of the Park, including
the sharing of expenses and revenues of the Park, and the manner in which the revenue is to be distributed
to each of the taxing entities within each of the Counties.
WHEREAS, the Counties previously created a multi-county Industrial/Business park known as
[NAME] (the “Existing Park”), which was amended by the County pursuant to Ordinance No. 2009-16
dated April 13, 2009 (“2009 Ordinance”) in order to add and include certain property within the Town of
Port Royal, South Carolina (the “Town”) 1 as more particularly shown on Exhibit B hereto (the “Prior
MCIP Property”).
WHERAS, Section 4-1-170(C) of the MCIP Law requires counties creating a multi-county
Industrial/Business park to obtain the consent of any affected municipality prior to the creation of such
park whenever the proposed park encompasses all or a portion of the municipality.
1 Also approved by the Town pursuant to Ordinance 2009-3 dated May 13, 2009.
Page 183 of 430
PPAB 3216107V3
WHEREAS, the Town, acting through staff and its consultants, initiated the request to form the Park,
and has further requested that some or all of the Prior MCIP Property be removed from the Existing Park
and thereafter be incorporated into the Park authorized and created hereunder as further shown and
described on Exhibit C attached hereto (the “Park Property”).
WHEREAS, through the creation of the Park, the Park Property shall be exempt from ad valorem
property taxes, and the character of the annual receipts from the Park Property shall be changed to Fee
Payments in an amount equivalent to the ad valorem taxes that would have been due and payable but for
the location of the Park Property in the Park.
WHEREAS, pursuant to the authority of the MCIP Law and the decision of the Supreme Court in
Horry County School District v. Horry County and the Town of Myrtle Beach, 346 S.C. 621 (2001), the
Town has further requested, in order to assist the Town in paying for the costs of the certain public
projects and improvements, that the County distribute a portion of the Fee Payments to the Town in an
amount greater than the Town’s proportionate share of the tax levy applicable to the Park Property had it
not been located in the Park.
WHEREAS, the Town, subject to the terms of that certain Intergovernmental Agreement with
Beaufort County, the form of which is attached hereto as Exhibit D (the “Intergovernmental Agreement”),
desires to give its permission and consent, pursuant to the terms of the MCIP Law, for the creation and
operation of the Park by the Counties.
NOW, THEREFORE, BE IT ORDAINED BY THE TOWN COUNCIL OF THE TOWN OF PORT
ROYAL:
Section 1. Consent; Acknowledgment of Park Agreement; Removal of Prior MCIP Property. The
consent of the Town is hereby expressly given for the creation, development and operation of the Park,
which includes the Park Property. The Town’s consent shall be further ratified and confirmed by and
through its acknowledgment of the Park Agreement. The Park Agreement, the form of which is attached
hereto as Exhibit A, shall be duly acknowledged by the Town Manager. As confirmed by the Park
Agreement, the Prior MCIP Property has been removed from the Existing Park, and any of the properties
that constitute both Property therein and Prior MCIP Property are be exclusively governed by the
provisions of the Park Agreement.
Section 2. Intergovernmental Agreement. The Town is authorized to enter into the
Intergovernmental Agreement with the County, the form of which is attached hereto as Exhibit D,
pertaining to the development of the Park and the terms and conditions under which the County will
distribute Fee Payments. The Mayor is authorized to execute the Intergovernmental Agreement and the
Town Clerk is authorized to attest the same. The Town Manager is authorized to deliver the
Intergovernmental Agreement to the Town and the County. The consummation of the transactions and
undertakings described in the Intergovernmental Agreement and such additional transactions and
undertakings as may be determined by the Town Manager to be necessary or advisable in connection
therewith, are hereby approved. In connection with the execution and delivery of the Intergovernmental
Agreement, the Town Manager is additionally authorized to prepare, review, negotiate, execute, deliver,
and agree to such additional agreements, certifications, documents, closing proofs, and undertakings as
he/she shall deem necessary or advisable.
Section 3. Further Assurances. The Mayor and the Town Manager (or their respective designees) are
authorized to execute whatever other documents and take whatever further actions as may be necessary to
effect the intent of this Ordinance.
Page 184 of 430
PPAB 3216107V3
Section 4. Severability. If any part of this Ordinance is unenforceable, the remainder is unaffected.
Section 5. General Repealer. Any ordinance, resolution or order, the terms of which conflict with
this Ordinance, is, only to the extent of that conflict, repealed.
Section 6. Effective Date. This Ordinance is effective after its final reading.
DONE, RATIFIED AND ENACTED this ____ day of ___________ 2026.
TOWN OF PORT ROYAL,
SOUTH CAROLINA
(SEAL)
Mayor
Attest:
Town Clerk
Town of Port Royal, South Carolina
First Reading:
Second Reading:
Page 185 of 430
PPAB 3216107V3
EXHIBIT A
FORM OF PARK AGREEMENT
Page 186 of 430
PPAB 3216107V3
EXHIBIT B
PRIOR MCIP PROPERTY
Page 187 of 430
PPAB 3216107V3
EXHIBIT C
PARK PROPERTY
Page 188 of 430
PPAB 3216107V3
EXHIBIT D
FORM OF INTERGOVERNMENTAL AGREEMENT
Page 189 of 430
STATE OF SOUTH CAROLINA )
)
TOWN OF PORT ROYAL ) INTERGOVERNMENTAL AGREEMENT
)
COUNTY OF BEAUFORT )
THIS INTERGOVERNMENTAL AGREEMENT is dated and effective as of _______, 2026
(this “Intergovernmental Agreement”), and is by and between Beaufort County, South Carolina, a county
and political subdivision of the State of South Carolina (“Beaufort County”) and the Town of Port Royal,
South Carolina, a municipal corporation and political subdivision of the State of South Carolina (the
“Town” and together with Beaufort County, the “Parties” and each individually, a “Party”).
RECITALS
WHEREAS, the Town is an incorporated municipality located in Beaufort County, and as such
possesses all powers granted to municipalities by the Constitution of the State of South Carolina 1895, as
amended (the “Constitution”), and general laws of the State of South Carolina (the “State”).
WHEREAS, Beaufort County is a political subdivision of the State, and as such possesses all
powers granted to counties by the Constitution and general laws of the State.
WHEREAS, Jasper County, South Carolina (“Jasper County”) and Beaufort County (jointly, the
“Counties”) are authorized pursuant to Article VIII, Section 13(D) of the Constitution and South Carolina
Code Annotated Section 4-1-170 (collectively, the “MCIP Law”) to jointly develop a multi-county
industrial or business park within the geographical boundaries of one or both of the member counties.
WHEREAS, Until 2004, the South Carolina Ports Authority operated a deep-water seaport on
waterfront property located in the Town (the “Port Property”). In 2004, the Port of Port Royal (the
“Port”) closed and the South Carolina Ports Authority offered the Port Property, including an original 33
parcels consisting of approximately 320 acres, for sale. Since the closing of the Port, the Port Property
has not been utilized for its original purpose, and multiple attempts at redevelopment the Port have been
unsuccessful, including a sale to Grey Ghost Properties, LLC in 2017 and a subsequent sale to SH
Marinas, LLC in 2021, who is the current owner of a majority of the Port Property.
WHEREAS, in contemplation of the redevelopment of the Port and surrounding area, the Port
Property and certain surrounding parcels (the “Prior MCIP Property”) were placed into a multi-county
Industrial/Business park (the “Existing Park”) established under the MCIP Law, which was amended by
County Ordinance No. 2009-16 dated April 13, 2009 and approved by Town Ordinance No. 2009-3 dated
May 13, 2009. Additionally, the Town caused to be prepared a redevelopment plan entitled “Seaport
Redevelopment Plan” dated December 9, 2011 (the “Port TIF”), which was additionally sanctioned and
approved by Beaufort County and the Beaufort County School District.
WHEREAS, the redevelopment of the Port has experienced substantial delays, and has never
been redeveloped at the scope and scale contemplated by the State, Beaufort County, the Town or their
respective citizens, and as a result of the delays, the Port TIF expired under State law and was terminated
by the Town on October 15, 2026.
WHEREAS, notwithstanding the lengthy and complicated history surrounding redevelopment
efforts relating to the Port, the Town recognizes that the revitalization and transformation of the
decommissioned Port Property and surrounding properties into a mixed-use development remains a
matter of vital importance to the economic growth, redevelopment, and long-term welfare of the Town.
Page 190 of 430
2
WHEREAS, in this regard, The Town the initiated a request to Beaufort County to develop and
create a new multi-county industrial or business park entitled the “Port Royal Business Park” (the “Park”)
and has further requested that some or all of the Prior MCIP Property be removed from the Existing Park
and thereafter be incorporated into the Park together with other properties in and around the Park (the
“Park Property”), as more fully described in the Master Agreement Governing the Port Royal Business
Park between the Counties (the “Master Agreement”).
WHEREAS, the Town desires to undertake, provide, or cause to be provided certain public
projects and improvements, as further described in Exhibit B (collectively, the “Project”), for the benefit
of the Park Property and the surrounding area, including improvements intended to support
redevelopment, public services, accessibility, recreation, community participation, interconnectivity and
economic growth.
WHEREAS, the Park and the revenues derived therefrom may be utilized to assist the Town in
defraying the costs of the Project.
WHEREAS, the Town and Beaufort County desire to enter into this Intergovernmental
Agreement to: (i) establish the purposes for the Park; (ii) identify the location of the Park; (iii) determine
the eligibility criteria for inclusion of the Park Property in the Park; (iv) confirm the commitment of the
Town to develop the Project to benefit the Park; and (v) ratify the methodology by which and the amount
of fee-in-lieu-of ad valorem taxes with respect to the property located in the Park (“Fees”) shall be paid to
the Town.
WHEREAS, the Town and Beaufort County each acting by and through their respective
governing bodies have authorized the execution and delivery of this Intergovernmental Agreement.
NOW THEREFORE, in consideration of the mutual agreement, representations, and benefits
contained in this Intergovernmental Agreement and for other good and valuable consideration, the receipt
and sufficiency of which is hereby acknowledged, the Parties hereby contractually agree as follows:
1. Binding Agreement; Representations.
(A) This Intergovernmental Agreement serves as a written instrument setting forth the entire
agreement between the Parties and shall be binding on the Parties, their successors and assigns.
(B) Each of the Parties represents and warrants that: (i) it has the full legal right, power, and
authority to enter into this Intergovernmental Agreement and carry out and consummate all other
transactions contemplated by this Intergovernmental Agreement; (ii) it has duly authorized the execution,
delivery, and performance of its obligations under th
Text truncated. Open the original for the full document.