Water and Sewer Committee Minutes
September 8, 2010
10:00 am
Town Hall, 2414 Murray Street, Edisto Beach, SC 29438
Attending from committee were David Lybrand, Charlie Kerekes, Bill Cumalander,
Bob Doub (ex-officio), Iris Hill (ex-officio) and Tommy Mann. Due to vacation
schedule, Ray Johnson was not able to attend.
Agenda covered the following topics:
-Low pressure Sewer Systems arranged by John Erwin from PP&S Environmental
and presented by Nick Spondike from Crane Pumps and Systems. Potential
applications for this type system at Edisto Beach are the first 20 blocks from
Pavilion to Baynard Street as phase 1. (Hilton Head has an operational system
and Mr. Erwin offered to arrange visit for our inspection and questions)
-Byo-Gon as an option to Conventional dredging of the Sewer lagoon.
Dredging bid is $150,000 and Byo-Gon offer at $84,500. Four questions derived
for investigation by Mr. Doub next week at RWC with Byo-Gon.
1. Will chemicals used hurt or kill grass and vegetation on Golf
Course as the effluent is used for irrigation on Course.
2. Can irrigation of effluent continue while treatment is underway?
3. Is Byo-Gon insured should effects of treatment cause problems to
Golf Course or other items.
4. Is there increased odor from Byo-Gon treatment and compare that
with dredging
-Mr. Doub gave an update of activities of Water and Sewer Departments versus
goals funded and set by Council. Complete are
Booster Pump at wellfield,
SCADA radios ordered with installation anticipated over next 30 to 60
days,
Water line engineering and line stubbing proposals in hand for Point
Street.
Committee approved motion to award engineering for Point Street water line
to American Engineering based upon quotes from BPB and AE. This will be
recommended to Council.
Sewer lift station rebuild underway,
Sludge removal discussed with questions to be resolved before final
recommendation is made, and
Ronks at two lift stations with other electrical upgrades completed.
-Proposal made and approved to recommend to Council for Feasibility Study on
two items.
1. Feasibility study for sewer system on front beach
2. Feasibility study for water quality improvement by one of several
options: Water lines, Reverse osmosis, Deep wells to Mendendorf
aquifer.
-Review of Water usage, demand, and like and made Committee aware of
positive feedback from citizen on Employee (Jesse Miller) response and aide
during August.
-Your participation, feedback, corrections or additions to these notes is
appreciated. Next meeting to be scheduled as required.