RecordWell Data

06.03.2024 Agenda E Packet Full E Packet Cmpd

Jasper County · Jasper County · meeting of Jun 3, 2024 · Agenda packets

Open the original document More from Jasper County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Agenda 06.03.2024 Page 1 Watch Live via YouTube at: https://www.youtube.com/channel/UCBmloqX05cKAsHm_ggXCJlA Pursuant to Ordinance #08-17, Any citizen of the County may sign to speak in person at the Council Meeting (before the Council Meeting’s Regular Meeting start time) on the Public Comments Sign in Sheet on the Podium to address Council on matters pertaining to County Services and Operations. Presentations will be limited to three (3) minutes per person and total public input will be limited to 30 minutes. Written Public Comments may also be submitted by 1PM on the date of the Council Meeting by emailing your comment to: comments@jaspercountysc.gov. To participate in a Public Hearing for a specific agenda item, you may either email written public comments to comments@jaspercountysc.gov by 1:00PM on Monday, June 3, 2024; or you can speak in person at the Council Meeting by signing in on the Public Hearing Sign In Sheet located outside the Council Chambers Doors prior to the start of the meeting. Public Hearing Comments shall be limited to 3 minutes per person. Instructions may also be found at the Jasper County website www.jaspercountysc.gov FOR MORE INFORMATION, PLEASE CALL (843) 717-3696 Agenda 06.03.2024 Page 2 JASPER COUNTY COUNCIL Jasper County Clementa C. Pinckney Government Bldg. 358 3rd Avenue, Ridgeland, SC 29936 Monday, June 3, 2024 4:00PM Budget Workshop: FIT – Families in Transition – Jennifer Coleman Jasper Soil and Water Conservation District – Lyn Boyles Jasper County Election Commission – Jeanine Bostick Regular Council Meeting and Executive Session will begin at the conclusion of the Budget Workshop 1. Call to Order of Council Meeting by Chairman Sauls Clerk’s Report of Compliance with the Freedom of Information Act. *In compliance with the Freedom of Information Act, notice of meetings and agendas were posted and furnished to all news media and persons requesting notification* 2. Executive Session SECTION 30-4-70. (a) A public body may hold a meeting closed to the public for one or more of the following reasons: (2) Discussion of negotiations incident to proposed contract arrangements and proposed purchase or sale of property, the receipt of legal advice where the legal advice related to pending, threatened, or potential claim or other matters covered by the attorney-client privilege, settlement of legal claims, or the position of the public agency in other adversary situations involving the assertion against the agency of a claim –Tax Map # 063-26-14-001 and # 063-26-14-002; Banking Matters; Nickel Plate MCIP; Exit 3; Emergency Services: Crowley & Wechsler Agreement; Project Telfair (5) Discussion of matters relating to the proposed location, expansion, or the provision of services encouraging location or expansion of industries or other businesses in the area served by a public body – Prospect Update ANY EXECUTIVE SESSION MATTER ON WHICH DISCUSSION HAS NOT BEEN COMPLETED MAY HAVE DISCUSSION SUSPENDED FOR PURPOSES OF BEGINNING THE OPEN SESSION AT ITS SCHEDULED TIME, AND COUNCIL MAY RETURN TO EXECUTIVE SESSION DISCUSSION AFTER THE CONCLUSION OF THE OPEN SESSION AGENDA ITEMS. Agenda 06.03.2024 Page 3 PLEASE BE ADVISED THERE MAY BE VOTES BASED ON ITEMS FROM THE EXECUTIVE SESSION. 3: Return to Open Session at 6:30PM o 3.1 Action coming out of Executive Session 4. Pledge of Allegiance and Invocation: 5. Approval of the Consent Agenda Items: 6. Approval of the Regular Agenda: _______________________________________________________________________________________ PRESENTATIONS AND PROCLAMATIONS _______________________________________________________________________________________ 7. Proclamation for South Carolina Center for Father’s and Families proclaiming June the Joy of Fatherhood Month in Jasper County. 8. Presentation by the Gullah & Latino Advisory Council. ______________________________________________________________________________________ RESOLUTIONS _______________________________________________________________________________________ 9. Mr. Fulghum - Consideration of Resolution #R-2024-18 To Adopt The Jasper County Equal Employment Opportunity Plan. ______________________________________________________________________________________ PUBLIC HEARINGS, ORDINANCES AND ACTION ITEMS 10. Kim Burgess – Consideration of the 3rd reading and Public Hearing of Ordinance #O-2024-12 Authorising the Execution and Delivery of Certain Instruments Relating to the Acquisition, Construction, Renovation, Equipping, Use, and Leasing of Certain County Facilities; Approving the Issuance of St. Peters Parish/Jasper County Public Facilities Corporation Installment Purchase Revenue Bonds and Bond Anticipation Notes; Consenting to the Form of Trust Agreements Between St. Peters Parish/Jasper County Public Facilities Corporation and the Corporate Trustee; The Lease Of Certain Personal Property, Real Property And The Buildings And Other Site Improvements Located Thereon, by Jasper County, South Carolina to St. Peters Parish/Jasper County Public Facilities Corporation, Including Authorising the Execution and Delivery of a Base Lease Agreement, Between Jasper County and St. Peters Parish/Jasper County Public Facilities Corporation; Authorising the Execution and Delivery of a Public Facilities Purchase and Occupancy Agreement Between Jasper County and St. Peters Parish/Jasper County Public Facilities Corporation; Authorising the Execution and Delivery of a Lease Agreement Between Jasper County and St. Peters Parish/Jasper County Public Facilities Corporation; and Other Matters Relating Thereto. (1st reading 04.01.2024; 2nd reading 05.06.2024) Agenda 06.03.2024 Page 4 11. David Tedder – Consideration of the 2nd reading and Public Hearing of Ordinance #O-2024-14 authorizing the sale of a right of way easement over approximately 0.34 acres, 14,878 sq. ft., being a portion of TMS 042-00-05-040 adjacent to the Interstate Highway I-95, to the South Carolina Department of Transportation in order to facilitate the widening, in exchange for the amount of $20,900.00 in just compensation, and to authorize the Jasper County Administrator to execute such right of way easement and other documents as may be necessary and appropriate to effect the transfer to the South Carolina Department of Transportation, or its assigns, and matters related thereto. (1st reading 04.01.2024) (I95 widening project). 12. Lisa Wagner – Consideration of the 2nd reading and Public Hearing and Consideration of Ordinance #O-2024-15 to amend: (i) Ordinance Number O-2022-16 to adopt updated standards for the Planned Development District encompassing a 38.84 acre parcel located on U.S. Highway 278 (the “Property”); and (ii) Ordinance O-2022-14 to amend the development agreement (the “Development Agreement”) between Jasper County (the “County”) and Conduit Street Partners, LLC (“CSP” or the “Developer”) that governs CSP’s development of the Property into a 275 -unit single-family residential community (the “Project”); in both cases to allow for the possibility that the Project may include not only “for rent” residential dwellings, but also “for sale” residential dwellings; and matters related thereto. (1streading 05.06.2024) CITIZEN COMMENTS _______________________________________________________________________________________ 13. Open Floor to the Public per Ordinance 08-17 Any citizen of the County may sign to speak in person at the Council Meeting (before the Council Meeting’s 6:30PM start time on the Sign-In Sheet on the Podium), to address Council on matters pertaining to County Services and Operations. Presentations will be limited to three (3) minutes per person and total public input will be limited to 30 minutes. _______________________________________________________________________________________ 14. Administrator’s Report CONSENT AGENDA _______________________________________________________________________________________ 15. Kimberly Burgess - Consideration of the 3rd reading of Ordinance #O-2024-13 To Provide For The Levy Of Tax For Public Purposes In Jasper County For The Fiscal Year Beginning July 1st, 2024 And Ending June 30th 2025 And To Make Appropriations For Said Purposes; To Adopt And Approve The Jasper County Capital And Operations Budget For Fiscal Year 2024-2025, To Adopt And Approve The Jasper County School District Capital And Operations Budget For Fiscal Year 2024–2025; To Provide For The Levy Of Taxation For Fiscal Year 2024 –2025; To Limit The Disbursements By The County Treasurer To Those Appropriated By Law; To Provide That Expenditures Not Exceed Appropriations; To Authorize Tax Anticipation Notes; To Make Authorization Of Certain Transfers; To Provide For Additional Appropriations And Borrowing; To Codify Jasper County Rates And Fees; To Provide For Lapsin g Funds And Continuing Appropriations For Subsequent Years; To Require Certain Agencies And Departments To File Accountings; To Require The Treasurer To Sign General Fund Checks; To Provide Special Rules For Travel And Training Disbursements; Agenda 06.03.2024 Page 5 To Provide For Travel Reimbursements; To Provide Compliance With Act No. 317 Of 1990; To Provide Certain Benefits To Council Members; To Provide For County Commission And Committee Stipends; To Provide For Jury Mileage; To Adopt Property Values; And To Pro vide For Effective Date Of This Ordinance (1st reading 05.06.2024; 2nd reading and Public Hearing 05.20.2024) 16. Kimberly Burgess – Bid Acceptance Recommendation for a Container and Compactor Bid for the purchase of four (4) containers and one compactor for use at the solid waste collection centers and to authorize the County Administrator or his designee to execute all documents necessary to complete the purchase. 17. Danny Lucas – Consideration of the 2024 CDBG Ranking Summary 18. Kimberly Burgess – Bid Acceptance Recommendation for Debris Removal at the Coosawhatchie Community Center site 19. Kimberly Burgess – Proposal Acceptance Recommendation for Financial and Compliance Auditing Services 20. Andrew Fulghum - Acceptance of Body Armor Assistance Grant No. 1BA24008 award from the SC Department of Public Safety. 21. Kimberly Burgess - Acceptance and authorization of M. B. Kahn Construction Co., Inc. Capital Planning Services Extension 22. Approval of the Minutes 04.01.2024 _______________________________________________________________________________________ END OF CONSENT AGENDA _______________________________________________________________________________________ 23. Council Members Comments: 24. Possible Return to Executive Session to Continue Discussion on Matters Regarding Agenda Item II. *Council may act on any item appearing on the agenda including items discussed in executive session. 25. Adjournment: In accordance with South Carolina Code of Laws, 1976, Section 30-4-80(d), as amended, notification of the meeting was posted on the County Council Building at a publicly accessible place and on the county website at least 24 hours prior to the meeting. A copy of the agenda was given to the local news media and posted at the meeting location twenty-four hours prior to the meeting. Special Accommodations Available Upon Request to Individuals with Disabilities (843) 717-3696 FIT – Families in Transition – Jennifer Coleman Jasper Soil and Water Conservation District– Lyn Boyles Jasper County Election Commission – Jeanine Bostick 1 2024 – 2025 Board of Elections Proposed Budget Explanations 1. 2008 - Cost of Living Adjustment: +$10,400.00 2024 - 2025 Proposed Budget Amount: $536,250.00 2023- 2024 Adopted Budget Amount: $473,750.00 Increase Of: +$ 62,500.00 NOTE: Revenue from City of Hardeeville and Town of Ridgeland Elections $4,400 each. Motioned to approve by Ms. Carrie Fair, seconded by Mrs. Hilda Stevenson-Stewart. Motion carried unanimously. March 14, 2024, at the monthly board meeting. 2 2024 - 2025 JASPER COUNTY BOARD OF ELECTION & VOTERS REGISTRATION PROPOSED BUDGET REQUEST ACCOUNT ACCOUNT DESCRIPTION 2023 - 2024 ADOPTED BUDGET 2024-2025 PROPOSED BUDGET 2000 SALARIES & WAGES $127,250.00 $132,250.00 (3% Cost of Living for Admin Asst; Deputy Director & Director’s Salary) 2001 PART-TIME SALARIES $60,000.00 $ 60,000.00 (Poll Workers) 2008 COST OF LIVING ADJUSTMENT $9,400.00 $10,400.00 2020 OVERTIME $0.00 $0.00 2030 FICA—EMPLOYER CONTRIB. $9,700.00 $9,700.00 FINANCE DEPARTMENT COMPUTES FIGURES 2036 S.C. RERETIREMENT-EMPLOYER $23,400.00 $23,400.00 FINANCE DEPARTMENT COMPUTES FIGURES 2040 MEDICAL INSURANCE $26,500.00 $26,500.00 FINANCE DEPARTMENT COMPUTES FIGURES 2050 TORT INSURANCE $18,000.00 $18,000.00 FINANCE DEPARTMENT COMPUTES FIGURES 2060 WORKER’S COMPENSATION $2,600 $ 2,600.00 FINANCE DEPARTMENT COMPUTES FIGURES 2100 TELEPHONE $4,000.00 $ 4,000.00 FINANCE DEPARTMENT COMPUTES FIGURES 2200 OFFICE SUPPLIES $4,400.00 $ 4,400.00 FINANCE DEPARTMENT COMPUTES FIGURES 2300 GAS, OIL & GREASE $1,400.00 $1,400 PER FINANCE DEPARTMENT COMPUTES FIGURES 2307 NEW VEHICLES $0.00 $55,000.00 Purchase Vehicle to Transport Voting Equipment, ie., Voter Registration Drives and Poll Workers Training 2310 VEHICLE INSURANCE $0.00 $1,500.00 FINANCE DEPARTMENT COMPUTES FIGURES 2320 VEHICLE MAINTENANCE $1,400.00 $1,400.00 FINANCE DEPARTMENT COMPUTES FIGURES 2400 MAINTENANCE CONTRACTS $80,000.00 $80,000.00- Copiers and Printers; ES& S Voting Equipment; Preventive Maintenance; Hardware & Software Contract. 2440 OFFICE EQUIPMENT $10,000.00 $10,000.00 (Additional Voting Equipment for New Precinct Margaritaville) 2610 TRAVEL & TRAINING $30,000.00 $30,000.00 - SCARE Conference - SCARE Conference Fees; Dues; Mandatory Certification and Continued Education Trainings; District Meetings and Workshops; Hotel Accommodations; Mileage & Meal Expenses 2825 UTILITIES $5,000.00 $ 5,000.00 FINANCE DEPARTMENT COMPUTES FIGURES 2850 ELECTION EXPENSES $35,000.00 $35,000.00 - Town of Ridgeland Election; (to include but not limited; Election supplies; delivery of voting equipment; vehicle leasing f ees; custodian fees; COVID-19 precinct cleaning expenses; voter registration drives, poll workers training 2870 MEDIA SERVICES $5,000.00 $5,000.00 3200 VORTERS REGISTR-BOARD MEMBERS $20,700.00 $20,700.00 TOTAL $473,750.00 $536,250.00 3 PROCLAMATION Jasper County Proclamation for Fatherhood WHEREAS, fathers are the cornerstone of strong families, providing love, guidance, and support to their children; and WHEREAS, the positive impact of fathers on their children’s development cannot be overstated, as they instill values, encourage growth, and foster resilience; and WHEREAS, the South Carolina Center for Fathers and Families, established in 2002, has been a beacon of support, equipping tens of thousands of fathers across our state with the resources and knowledge needed to embrace responsible fatherhood; and WHEREAS, the long public-private partnership between the Center and state, local, and private agencies, has led to the Center’s expansion and innovation of programs to serve more dads better; and WHEREAS, the Center has developed and expanded the reach of its network of five regional fatherhood organizations, including A Father’s Place, Man 2 Man, Midlands Fatherhood Coalition, A Father’s Way, and Upstate Fatherhood Coalition; and WHEREAS, when fathers actively lead and engage with their children, these young lives flourish socially, emotionally, and academically; and WHEREAS, the Center continues to serve as a model for fatherhood initiatives nationwide; and WHEREAS, the month of June provides an opportunity for all citizens of South Carolina to celebrate and honor the joys of fatherhood, recognizing the tireless efforts of fathers in shaping the future of our communities; and NOW, THEREFORE, BE IT RESOLVED, that Jasper County Council of the great State of South Carolina do hereby proclaim the month of June 2024 as The Joy of Fatherhood Month throughout our county and encourage all our residents to express gratitude for the fathers in their lives, celebrate their contributions, and to promote the active involvement of fathers in children's lives to enhance the lives of our young people, build better citizens, and strengthen South Carolina families and communities. Dated this 3rd day of June 2024. County Council of Jasper County, SC ____________________________________ (Seal) Chairman, Jasper County Council 1 STATE OF SOUTH CAROLINA JASPER COUNTY RESOLUTION NUMBER # R-2024 -18 RESO LUTION OF JASPER COUNTY COUNCIL A RESOLUTION TO ADOPT THE JASPER COUNTY EQUAL EMPLOYMENT OPPORTUNITY PLAN WHEREAS, Jasper County , South Carolina has developed a policy to promote the specific goals and objectives for ensuring equal opportunities within the Coun ty; and WHEREAS, such a policy has been created in conformance with the guidelines established by the federal government utilizing the most recent data available; and WHEREAS, it is the continuing policy of the Jasper County Council to afford equal employment opportunities to qualified individuals regardless of sex, race, creed, disability, or national origin, and to conform to the applicable law and regulations; and WHEREAS, equal opportunity encompasses all aspects of employment practices to include, but no limited to, recruiting, hiring, training, compensation , benefits, promotions, transfers, recalls from layoffs, discipline, and department sponsored educational and social and recreational programs; and WHEREAS, it is the policy of Jasper County to provide its employees a viable means for communicating and resolving grievances and complaints regarding unlawful discriminatory employment practices , and any employee of Jasper County who fails to comply with this policy is subject to disciplinary action; NOW THEREFORE, BE IT RESOLVED by the Jasper County Council, in Council duly assembled and by the authority of the same , that Jasper County 2 Council hereby adopts and enacts the attached Jasper County Equal Employment Opportunity Plan; and AND BE IT FURTHER RESOLVED, that all previously adopted or approved Equal Employment Opportunity Plans are her eby repealed and replaced with the Jasper County Equal Employment Opportunity Plan adopted herein. ADOPTED THIS THE 3rd DAY OF JUNE 2024. SIGNATURES FOLLOW This Resolution No. R-2024-18 made this 3rd day of June, 2024. ______________ _______ L. Martin Sauls, IV Chairman ATTEST: _____________________ Wanda H. Giles Clerk to Council Revie wed for form and draftsmanship by the Jasper County Attorney. ________ ___________________ _____________ David L. Tedder Date EQUAL EMPLOYMENT OPPORTUNITY PLAN ADOPTED JUNE 3, 2024 EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 i -- Place holder for a resolution -- EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 ii TABLE OF CONTENTS EXECUTIVE SUMMARY ................................ ................................ ................................ ................................ V SECTION I ................................ ................................ ................................ ................................ ................... 1 EEOP Purpose ...................................................................................................................................................... 1 EEO Policy Statement .......................................................................................................................................... 2 Diversity, Equity, and Inclusion Policy ................................................................................................................. 3 SECTION II ................................ ................................ ................................ ................................ .................. 4 Demographics ..................................................................................................................................................... 4 Utilization Analysis .............................................................................................................................................. 5 SECTION III ................................ ................................ ................................ ................................ ................. 8 Objectives ............................................................................................................................................................ 8 Implementation................................................................................................................................................... 9 SECTION IV ................................ ................................ ................................ ................................ ................ 12 Appendix A: Demographics ............................................................................................................................... 12 Appendix B: Workforce Analysis ....................................................................................................................... 15 Appendix C: Definitions of Race/Ethnicity Categories ...................................................................................... 40 Appendix D: Description of Job Categories ....................................................................................................... 41 EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 iii LIST OF TABLES Table 1: Population Change 2000-2020 ................................................................................................................ 12 Table 2: Race and Ethnicity 2000-2020 ................................................................................................................. 12 Table 3: Age Distribution 2000-2020 .................................................................................................................... 13 Table 4: Household Formation 2000-2020 ........................................................................................................... 13 Table 5: Educational Attainment 2000-2020 ........................................................................................................ 14 Table 6: Income 2000-2020 ................................................................................................................................... 14 Table 7: Workforce Utilization Analysis 2021 ....................................................................................................... 25 Table 8: Significant Workforce Underutilization 2021 .......................................................................................... 27 Table 9: Workforce Utilization Analysis between 2011 and 2021 ........................................................................ 37 Table 10: Significant Improvement of Workforce Utilization between 2011 and 2021 ....................................... 39 EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 iv LIST OF FIGURES Figure 1: Workforce for All Job Categories by Sex in 2021 ................................................................................... 15 Figure 2: Male Workforce by Job Category in 2021 .............................................................................................. 16 Figure 3: Female Workforce by Job Category in 2021 .......................................................................................... 17 Figure 4: Workforce for All Job Categories by Race and Ethnicity in 2021 ........................................................... 18 Figure 5: White Workforce by Job Category in 2021 ............................................................................................ 19 Figure 6: Black or African American Workforce by Job Category in 2021 ............................................................ 20 Figure 7: American Indian or Alaska Native Workforce by Job Category in 2021 ................................................ 21 Figure 8: Asian Workforce by Job Category in 2021 ............................................................................................. 22 Figure 9: Native Hawaiian or Other Pacific Islander Workforce by Job Category for in 2021 .............................. 23 Figure 10: Hispanic or Latino Workforce by Job Category in 2021 ....................................................................... 24 Figure 11: Workforce for All Job Categories by Sex between 2011 and 2021 ...................................................... 28 Figure 12: Male Workforce by Job Category between 2011 and 2021................................................................. 29 Figure 13: Female Workforce by Job Category between 2011 and 2021 ............................................................. 30 Figure 14: Workforce for All Job Categories by Race and Ethnicity between 2011 and 2021 .............................. 31 Figure 15: White Workforce by Job Category between 2011 and 2021 ............................................................... 32 Figure 16: Black or African American Workforce by Job Category between 2011 and 2021 ............................... 33 Figure 17: American Indian or Alaska Native Workforce by Job Category between 2011 and 2021 ................... 34 Figure 18: Asian or Native Hawaiian or Other Pacific Islander Workforce by Job Category between 2011 and 2021 ...................................................................................................................................................... 35 Figure 19: Hispanic or Latino Workforce by Job Category between 2011 and 2021 ............................................ 36 EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 v EXECUTIVE SUMMARY Jasper County is committed to ensuring that equal employment opportunity in the workplace is mandatory. The Equal Employment Opportunity Plan (EEOP) has been updated to reiterate the County’s commitment to a diverse workforce through employment, career development opportunities, and promotion of an inclusive workforce; and provide a work environment that prohibits discrimination based on sex, race, color, religion, national origin, disability, age, sexual orientation, pregnancy, socio-economic, or marital status. The EEOP includes information on the importance of equal employment opportunities in the workplace, demographics and trends, workforce utilization analysis, and key objectives for ensuring equal employment opportunities at all levels. A comparison of county workforce and available workforce indicates underutilization of women and minorities in several categories i.e., Officials/Administrators, Professionals, Technicians, and Protective Services. In addition, a comparison of county workforce between 2011 and 2021 shows significant improvements in the recruitment and retention of women and minorities in the Officials/Administrators, Professionals, Skill Craft, and Service/Maintenance categories. The County has analyzed this information to determine whether and where underutilization of workforce exists. The County will address any areas of underutilization and will prioritize available recruitment and promotional opportunities. Promoting diversity and inclusion at all levels of the workforce shall not be exercised through quotas, but rather through merits. Jasper County recognizes that an effective and efficient government requires a workforce with knowledge, skills, and abilities that are necessary for essential job functions to support the County’s services. Key objectives have been developed to guide and measure progress towards achieving equal employment opportunities. The three key objectives are: • Compliance with policies and regulations • Increased communication, outreach, and diversity • Diversity, equity, and inclusion training Jasper County, with support of the Equal Employment Opportunity Committee, the Human Resources Department, Department Heads, and employees, will implement these objectives and pursue solutions to problems that might impede the progress of this plan. EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 1 SECTION I EEOP PURPOSE An Equal Employment Opportunity Plan (EEOP) is a comprehensive document that analyzes the organization’s relevant labor market data, as well as the organization’s employment practices, to identify possible barriers to the participation of all groups of people, specifically addressing the level of participation of minorities and women in the organization’s workforce. The EEOP purpose is to ensure the opportunity for full and equal participation of men and women in the workplace, regardless of race, color, or national origin. The EEOP is required by a federal regulation to implement the provision prohibiting employment discrimination. According to the U.S. Equal Employment Opportunity Commission, federal equal employment laws for local governments include: Race, Color, Religion, Sex, National Origin Title VII of the Civil Right Act of 1964, as amended, protects applicants and employees from discrimination in hiring, promotion, discharge, pay, fringe benefits, job training, classification, referral, and other aspects of employment, on the basis of race, color, religion, sex (including pregnancy), or national origin. Religious discrimination includes failing to reasonably accommodate an employee’s religious practices where the accommodation does not impose undue hardship. Disability Americans with Disabilities Act of 1990, as amended, protect qualified individuals from discrimination on the basis of disability in hiring, promotion, discharge, pay, fringe benefits, job training, classification, referral, and other aspects of employment. Disability discrimination includes not making reasonable accommodation to the known physical or mental limitations of an otherwise qualified individual with a disability who is an applicant or employee, barring undue hardship. COUNTY MISSION: TO PROVIDE EFFICIENT GOVERNMENT SERVICES AND MANAGE GROWTH WHILE PROTECTING JASPER COUNTY’S RICH ENVIRONMENTAL HERITAGE AND QUALITY OF LIFE. EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 2 Age Age Discrimination in Employment Act (ADEA) of 1967, as amended, protects applicants and employees 40 years of age or older from discrimination based on age in hiring, promotion, discharge, pay, fringe benefits, job training, classification, referral, and other aspects of employment. Sex (Wages) The Equal Pay Act of 1963, as amended, prohibits sex discrimination in the payment of wages to women and men performing substantially equal work, in jobs that require equal skill, effort, and responsibility, under similar working conditions, in the same establishment. Genetics Title II of the Genetic Information Nondiscrimination Act of 2008 (GINA), protects applicants and employees from discrimination based on genetic information in hiring, promotion, discharge, pay, fringe benefits, job training, classification, referral, and other aspects of employment. GINA also restricts employers’ acquisition of genetic information and strictly limits disclosure of genetic information. Genetic information includes information about genetic tests of applicants, employees, or their family members; the manifestation of diseases or disorders in family members (family medical history); and requests for or receipt of genetic services by applicants, employees, or their family members. EEO POLICY STATEMENT It is the policy of Jasper County to provide fair and equal employment opportunity to all qualified men and women within its workforce and to prohibit discrimination in employment on the basis of race, color, religion, sex, national origin, disability, age, sexual orientation, pregnancy, socio-economic, or marital status. The County is committed to ensuring an inclusive, diverse workforce that is reflective of the community it serves. This Equal Employment Opportunity Plan provides the foundation of the community it serves. The County’s fair and equal employment opportunity policy includes, but is not limited to: • Nondiscriminatory recruitment, screening, testing, hiring, training, promoting of persons in all job categories. • Employment decisions that are based on Jasper County’s commitment to equal employment opportunity. • Ensuring that promotion decisions are in accordance with the principles of equal employment opportunity by imposing only valid requirements for promotional opportunity. • Ensuring that all personnel actions such as compensation, benefits, transfers, work assignments, layoffs, return from layoff, disciplinary actions, terminations, training, and education are administered in a fair and nondiscriminatory manner. • Ensuring affirmative steps are taken to correct under-representation of any protected group within the County’s workforce. EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 3 DIVERSITY, EQUITY, AND INCLUSION POLICY Jasper County is committed to fostering, cultivating, and preserving a culture of diversity, equity and inclusion. Our human capital is the most valuable asset we have. The collective sum of the individual differences, life experiences, knowledge, inventiveness, innovation, self-expression, unique capabilities and talent that our employees invest in their work represents a significant part of not only our culture, but our reputation and company’s achievement as well. We embrace and encourage our employee’s differences in age, color, disability, ethnicity, family or marital status, gender identity or expression, language, national origin, physical and mental ability, political affiliation, race, religion, sexual orientation, socio-economic status, veteran status, and other characteristics that make our employees unique. Jasper County’s diversity initiatives are applicable, but are not limited, to our practices and policies on recruitment and selection, compensation and benefits, professional development and training, promotions, transfers, social and recreational programs, layoffs, terminations, and the ongoing development of a work environment built on the premise of diversity, equity, and inclusion that encourages and enforces. • Respectful communication and cooperation between all employees. • Teamwork and employee participation, permitting the representation of all groups and employee perspectives. • Work/life balance through flexible work schedules to accommodate employees’ varying needs. • Employer and employee contributions to the communities we serve to promote a greater understanding and respect for diversity. All employees of Jasper County have a responsibility to treat others with dignity and respect at all times. All employees are expected to exhibit conduct that reflects inclusion during work, at work functions on or off the work site, and at all other county-sponsored and participative events. All employees are also required to attend and complete annual diversity awareness training to enhance their knowledge to fulfill this responsibility. Any employees found to have exhibited any inappropriate conduct or behavior against others may be subject to disciplinary action. Employees who believe they have been subjected to any kind of discrimination that conflicts with the county’s diversity policy and initiatives should seek assistance from a supervisor or an HR representative. EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 4 SECTION II DEMOGRAPHICS Jasper County comprises the City of Hardeeville, the Town of Ridgeland, and unincorporated areas. According to Census Bureau’s urban-rural classification, 14% of the County’s areas are classified as urban in 2020. According to Census Decennial, the County’s population increased by 39.2% from 20,678 in 2000 to 28,363 in 2020, with the strongest growth in the southern portions of the County. These figures include a large increase from 1,793 to 7,228 (316.8%) in the City of Hardeeville. The County’s population is expected to increase by 64.6% by 2035 to exceed 34,000. In 2020, the County’s population density stood at 43.9 persons per square mile. Historically the County’s population was almost entirely composed of Blacks and Whites, with relatively small numbers of Asians, Native Americans, Pacific Islanders, and Hispanics. Between 2000 and 2020, there have been significant changes in the population’s composition, with an increase of Hispanics by 326.8%. In 2020, the racial mixture is 45.3% Whites, 33.2% Blacks, 21.5% other races. The ethnic population comprises Hispanics (17.6%). The Hispanic population continued to grow in the County. The age composition is an important factor in determining the workforce available in the County. The County’s median age is 42.5 in 2020. The number of working age population (15-64) has increased but at a slow rate. This may suggest a shrinking future labor force. The County also saw a marked increase in population 60 years and older at 183.8% from 2000 to 2020. The population 60 years and older comprises approximately three in ten people. In 2020, a total of 11,272 households resided in the County, with a 60.5% increase from 2000. The average household size of 2.71 persons in the County is slightly larger than that of the Lowcountry region (2.56) and the state (2.53). The majority of households (46.9%) are married couples. There are more female-headed households (29.2%) compared to male-headed households (17.9%). Among single-person households, 40.8% are people aged 65 or older. The educational attainment of the County’s population can influence economic development, earning potential, and quality of life. Between 2000 and 2020, the County saw an increase of population 25 years and older that holds a high school diploma (65.7%) or a higher education degree (some college or associate’s degree 117.9%, bachelor’s degree 291.2%, and graduate degree 292.3%). Presumably, the high percentage in higher education compensates for the low percentage of the population with a high school diploma. In 2020, the County’s median household income is $45,924, below the averages for the region ($48,070) and the state ($54,864). Between 2000 and 2020, median income had increased by 49.5%, however inflation- adjusted median incomes had declined by 0.1%. Further details on demographics can be found in Appendix A. EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 5 UTILIZATION ANALYSIS A utilization analysis is a workforce analysis made to ensure that Jasper County provides equal employment opportunities to women and minorities. A utilization analysis compares the County’s workforce to the relevant labor market in terms of sex, race and ethnicity, and job category. In addition, this section provides a comparison of County workforce between 2011 and 2021 to reflect changes in workforce overtime. Further details on comparison of County workforce to available workforce and comparison of County workforce between 2011 and 2021 can be found in Appendix B. Definitions of race and ethnicity and description of job category can be found in Appendix C and Appendix D respectively. The results of the analyses will help determine if there is underutilization in the County government and how to develop goals and engage in targeted outreach and recruitment activities to help meet Equal Employment Opportunity requirements. Comparison of County Workforce to Available Workforce Workforce by Sex The County’s workforce is predominantly male, while the available workforce is predominantly female. Males comprise 53% of the County’s workforce and 47.5% of the available workforce. Females comprise 47% of the County’s workforce and 52.5% of the available workforce. The County’s female workforce is under- represented by 5.5%. Workforce by Race and Ethnicity The County’s workforce and available workforce are predominantly White. The County’s racial/ethnic workforce exceeds available workforce in Whites by 3%, Blacks by 3.2%, and American Indian or Alaska Natives by 0.6%. The County’s racial/ethnic workforce is under-represented in Asians by 0.7%, Hispanics by 5.5%, and Others by 0.8%. Workforce by Job Category • Officials/Administrators - There was an under-representation of White males by 24.2%, White females by 17.5%, and Hispanic males by 2.4%. - Hispanics females were not represented at all, with an under-representation by 2.4%. • Professionals - There was an under-representation of Whites females by 31.3%. - Asian males, Asian females, and Hispanic males were not represented at all, with an under- representation by 3%, 3.5%, and 1% respectively. EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 6 • Technicians - Black males and Hispanic males were not represented at all, with an under-representation by 13.5% and 11.7% respectively. • Protective Services - Black males were under-represented by 24.4%. • Administrative Support - There was an under-representation of White males by 9.1%, Black males by 0.5%, and Black females by 1.4%. - Asian males, Native Hawaiian or Other Pacific Islander males, and Hispanic males were not represented at all, with an under-representation by 1.1%, 0.2%, and by 0.6% respectively. • Skilled Craft - There was an under-representation of White males by 4.5%. - Hispanic males were not represented at all, with an under-representation by 30.1%. • Service/Maintenance - There was an under-representation of White males by 4.9% and Black females by 11.7%. Hispanic males and females were not represented at all, with an under-representation by 5.8% and 4.2% respectively. Comparison of County Workforce between 2011 and 2021 Workforce by Sex A comparison of the County’s workforce between 2011 and 2021 reflects the predominance of male employees. However, the County saw an increase of females in the workforce from 41.9% in 2011 to 47% in 2021. Workforce by race and Ethnicity A comparison of the County’s workforce between 2011 and 2021 reflects the predominance of Whites with roughly unchanged representation from 57.3% in 2011 to 57.5% in 2021. The County saw an increase of Blacks in the workforce from 41.9% in 2011 to 47% in 2021. For the same period, the representation of other races and ethnicities decreased: American Indians and Alaska Natives (0% to 0.6%), Asians or Native Hawaiians or Other Pacific Islanders (0.3% to 0.6%), and Hispanics (0.7% to 3.2%). Workforce by Job Category • Officials/Administrators - Increase in representation: Black males by 16.7%, Black females by 15%, and American Indian or Alaska Native females by 2.5%. - Decrease in representation: White males by 28.3%, White females by 4.2%, and Asian or Native Hawaiian or Other Pacific Islander females by 1.7%. - No representation at all: American Indian or Alaska Native males, Asian or Native Hawaiian or Other Pacific Islander males, Hispanic males, and Hispanic females. EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 7 • Professionals - Increase in representation: Black males by 9.1%, Asian or Native Hawaiian or Other Pacific Islander males by 3.1%, White females by 1.6%, Black females by 2.5%, American Indian or Alaska Native females by 3.1%. - Decrease in representation: White males by 19.3%. - No representation at all: American Indian or Alaska Native males, Hispanic males, Asian or Native Hawaiian or Other Pacific Islander females, and Hispanic females. • Technicians - Increase in representation: White males by 40%. - Decrease in representation: Black males by 20% and Hispanic males by 20% - No representation at all: American Indian or Alaska Native males, Asian or Native Hawaiian or Other Pacific Islander males, Hispanic males, American Indian or Alaska Native females, Asian or Native Hawaiian or Other Pacific Islander females, and Hispanic females. • Protective Services - Increase in representation: White males by 25.4%, White females by 3.3%, and Hispanic females by 0.7% - Decrease in representation: Black males by 24.5%, Hispanic males by 0.8%, and Black females by 4.1% - No representation at all: American Indian or Alaska Native males, Asian or Native Hawaiian or Other Pacific Islander males, American Indian or Alaska Native females, and Asian or Native Hawaiian or Other pacific Islander females. • Administrative Support - Increase in representation: White males by 2.3%, Black males by 2.3%, Black females by 6.2%, and Hispanic females by 9.2%. - Decrease in representation: White females by 20%. - No representation at all: American Indian or Alaska Native males, Asian or native Hawaiian or Other Pacific Islander males, Hispanic males, American Indian or Alaska Native females, and Asian or Native Hawaiian or Other Pacific Islander females. • Skilled Craft - Increase in representation: White males by 20.5% and White females by 23.7%. - Decrease in representation: Black males by 34.5% and Black females 9.8%. - No representation at all: American Indian or Alaska Native males, Asian or Native Hawaiian or Other Pacific Islander males, Hispanic males, American Indian or Alaska Native females, Asian or Native Hawaiian or Other Pacific Islander females, and Hispanic females. • Service/Maintenance - Increase in representation: White males by 16.7%, Black males by 54.2%, White females by 20.8%, Black females by 8.3% - Decrease in representation: None because there was no workforce utilization in 2011. - No representation at all: American Indian or Alaska Native males, Asian or Native Hawaiian or Other Pacific Islander males, Hispanic males, American Indian or Alaska Native females, Asian or Native Hawaiian or Other Pacific Islander females, and Hispanic females. EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 8 SECTION III As the 8th largest employer in the County with approximately 350 employees, Jasper County is committed to the principle that equal employment opportunity must be affordable to all persons, regardless of race, ethnicity, creed, color, sex, sexual orientation, gender identity or expression, national origin or ancestry, marital or familial status, pregnancy, veteran status, religious belief or non-belief, age, disability or any other legally protected class under federal or state law. No person shall suffer discrimination with respect to employment or other terms or conditions of employment by reason of such person’s status as enumerated above. Jasper County administration reflects the people it serves. The following provides the County’s key objectives for ensuring equal employment opportunities at all levels. OBJECTIVES Compliance with Policies and Regulations • To evaluate the County’s personnel activities and management to ensure compliance with federal and state employment regulations. • To align with the goals of the Diversity, Equity, and Inclusion Policy. • To administer all personnel actions in a non-discriminatory manner as stated within the Equal Employment Opportunity Plan. Increased Communication, Outreach, and Diversity • To clearly communicate with all elected officials, department heads, employees, applicants, and the public about the EEO information on a regular basis throughout the year with educational information and policy reminders. • To expand the pool of diverse and under-represented applicants based on assessments, reviews, and data. In addition, to participate in various community events to build partnerships with diverse community organizations. • To increase employment opportunities and equal participation of all qualified persons by eliminating non-job related factors, conditions, and requirements from any job vacancies. • To identify and remove any artificial, arbitrary, or unnecessary barriers to employment which operate to discriminate on the basis of race, ethnicity, creed, color, sex, sexual orientation, gender identity or expression, national origin or ancestry, marital or familial status, pregnancy, veteran status, religious belief or non- belief, age, disability or any other legally protected class under federal and state law. EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 9 Diversity, Equity, and Inclusion Training • To provide training regarding County policies that promote diversity, equity, and inclusion to foster positive intergroup relationships and a welcoming environment for all employees. • To provide training regarding workplace discrimination, harassment, retaliation, and inclusion, to ensure equal employment opportunities for all employees. IMPLEMENTATION Jasper County recognizes that equal employment opportunity may be ensured only by a carefully administered and practiced program designed to eliminate any practices, standards or conditions tending to result in discrimination. Additionally, by initiating positive efforts in recruitment, examination, selection, promotion, and training procedures, the County seeks to extend equal employment opportunities to all qualified persons without limiting, segregating, or classifying employees and applicants for employment in any way which would deprive any individual of employment opportunities or otherwise affect his or her status as an employee. An individual’s race, natural hair or hairstyles, ethnicity, creed, color, sex, sexual orientation, gender identity or expression, national origin or ancestry, marital or familial status, pregnancy, veteran status, religious belief or non-belief, age, disability or any other legally protected class under federal or state law shall not be considerations when extending employment opportunities. The County’s commitment to equal employment opportunity requires the support of County leadership, the Human Resources Department, department heads, and all employees as set forth in the following: Equal Employment Opportunity Committee • Comprising representatives from County Departments and citizens. • Encouraging and communicating EEO and diversity, equity, and inclusion policies and initiatives so that the County can better support the diverse workforce. • Reviewing statistical data of the County’s demographics and workforce for the purpose of evaluating the effectiveness of the County’s equal employment opportunity. • Liaising with Human Resources, Department heads, and employees to identify EEO problem areas and to recommend solutions. County Administrator • Providing executive leadership and oversight to ensure that department heads act as necessary to achieve and implement the EEO objectives as well as diversity, equity and inclusion. • Reiterating the County’s commitment to equal employment opportunities and a diverse and inclusive workforce at all levels through leadership support, policies and guidance, resources, and budgetary assistance. EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 10 Human Resources Department • Complying with applicable laws and regulations, reviewing personnel policies, employment practices and procedures, and making improvements or recommendations on steps to promote equal employment opportunity and diversity, equity and inclusion. • Conducting ongoing statistical analysis of the County’s workforce and taking steps to remedy underutilization to promote full participation and diversity at all levels of employment. • Developing and disseminating an EEO’s communication plan and materials to ensure that all departments and staff are aware, understand, and work within federal and state law, as well as County policies and procedures. The dissemination includes hard copy in areas highly visible to employees, the county web page for viewing and printing, and the county employee handbook. • Increasing countywide recruitment efforts to attract a broad and diverse candidate pool for positions in all categories, particularly for under-represented groups, to maintain a workforce reflective of the community it serves. Advertising for job openings with the statement: “We are an equal opportunity employer, and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity or expression, pregnancy, age, national origin, disability status, genetic information, protected veteran status, or any other characteristic protected by law.” Department Heads • Achieving progress towards equal employment practices by reviewing its department’s utilization of minorities, females, and disabled persons, determining barriers that may hinder their efforts for creating a diverse workforce, and working with the Human Resources Department to make improvement in those areas. • Creating and fostering work environments free of discrimination and taking prompt action when an employee, workforce member, or non-employee has been found engaging in discrimination, retaliation, or harassment (including sexual harassment) while conducting business on behalf of the County. • Encouraging department employees to notify or report all incidents of discrimination, retaliation, or harassment and taking appropriate measures to resolve the situation. EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 11 Employees • Applying the County’s policies, guidance, and training with respect to equal employment opportunity and conducting themselves in a manner that adheres to the County’s policies and guidance. • Supporting a work climate that is conducive to achieving equal employment opportunities and that is free of any form of discrimination or harassment. • Promptly notifying or reporting to Department Heads, the Human Resources Department, or the County attorney of all incidents of discrimination, retaliation, or harassment. EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 12 SECTION IV APPENDIX A: DEMOGRAPHICS Table 1: Population Change 2000-2020 2000 2010 2020 Change 2000-2010 Change 2010-2020 Change 2000-2020 Jasper County 20,678 24,777 28,791 19.8% 16.2% 39.2% City of Hardeeville 1,793 2,952 7,473 64.6% 153.2% 316.8% Town of Ridgeland 2,518 4,036 3,758 60.3% -6.9% 49.2% Unincorporated Areas 16,367 17,789 17,560 8.7% -1.3% 7.3% Source: U.S. Census Bureau, Decennial Census 2000-2020 Table 2: Race and Ethnicity 2000-2020 2000 2010 2020 Change 2000- 2010 Change 2010- 2020 Change 2000- 2020 Race White 8,766 10,658 13,715 21.6% 28.7% 56.5% Black or African American 10,895 11,406 9,645 4.7% -15.4% -11.5% American Indian and Alaska Native 76 122 145 60.5% 18.9% 90.8% Asian 92 176 197 91.3% 11.9% 114.1% Native Hawaiian and Other Pacific Islander 10 13 24 30.0% 84.6% 140.0% Some Other Race 700 2,050 3,029 192.9% 47.8% 332.7% Two or More Races 139 352 2,036 153.2% 478.4% 1,364.7% Ethnicity Hispanic or Latino 1,190 3752 5,079 215.3% 35.4% 326.8% Source: U.S. Census Bureau, Decennial Census 2000-2020 EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 13 Table 3: Age Distribution 2000-2020 2000 2010 2020 Change 2000-2010 Change 2010-2020 Change 2000-2020 Under 5 1,499 1,859 1,503 24.0% -19.2% 0.3% 5 to 9 1,602 1,711 1,594 6.8% -6.8% -0.5% 10 to 14 1,559 1,546 1,627 -0.8% 5.2% 4.4% 15 to 19 1,483 1,751 1,587 18.1% -9.4% 7.0% 20 to 24 1,527 1,969 1,713 28.9% -13.0% 12.2% 25 to 34 3,063 3,685 3,607 20.3% -2.1% 17.8% 35 to 44 3,282 3,217 3,267 -2.0% 1.6% -0.5% 45 to 54 2,538 3,524 3,201 38.8% -9.2% 26.1% 55 to 59 1,041 1,428 1,940 37.2% 35.9% 86.4% 60 to 64 815 1,300 2,237 59.5% 72.1% 174.5% 65 to 74 1,273 1,671 4,271 31.3% 155.6% 235.5% 75 to 84 738 785 1,784 6.4% 127.3% 141.7% 85 years and over 258 313 460 21.3% 47.0% 78.3% Source: U.S. Census Bureau, Decennial Census 2000-2020 Table 4: Household Formation 2000-2020 2000 2010 2020 Change 2000-2010 Change 2010-2020 Change 2000-2020 Total Households 7,025 8,517 11,272 21.2% 32.3% 60.5% Married Couple Household 3,565 3,768 5,284 5.7% 40.2% 48.2% Male Householder (no spouse) 376 596 2,019 58.5% 238.8% 437.0% Female Householder (no spouse) 1,176 1,580 3,293 34.4% 108.4% 180.0% Average Household Size 2.75 2.73 2.71 -0.7% -0.7% -1.5% Source: U.S. Census Bureau, Decennial Census 2000-2020 EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 14 Table 5: Educational Attainment 2000-2020 2000 2010 2020 Change 2000-2010 Change 2010-2020 Change 2000-2020 Less than High School 4,569 3,740 2,823 -18.2% -24.5% -38.2% High school 4,713 5,900 7,808 25.2% 32.3% 65.7% Some College or Associate's 2,685 3,844 5,850 43.2% 52.2% 117.9% Bachelor's degree 808 998 3,161 23.5% 216.7% 291.2% Graduate or professional degree 337 402 1,322 19.4% 228.6% 292.3% Source: U.S. Census Bureau, American Community Survey 5-Year Estimates 2000-2020 Table 6: Income 2000-2020 2000 2010 2020 Change 2000-2010 Change 2010-2020 Change 2000-2020 Median Household Income $30,727 $37,393 $45,924 21.7% 22.8% 49.5% Inflation Adjusted $45,990 $43,976 $45,924 -4.4% 4.4% -0.1% Per Capita Income $14,161 $17,997 $24,886 27.1% 38.3% 75.7% Inflation Adjusted $21,195 $21,165 $24,886 -0.1% 17.6% 17.4% Source: U.S. Census Bureau, American Community Survey 5-Year Estimates 2000-2020 EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 15 APPENDIX B: WORKFORCE ANALYSIS The following data provides statistical summaries on Jasper County’s current workforce and the civilian labor workforce or available workforce broken down by sex, race/ethnicity, and job classification. This section also provides comparison of County workforce to the community workforce to help determine if there is underutilization in the County government. In addition, it provides a comparison of County workforce between 2011 and 2021 to reflect changes in workforce overtime. Comparison of County Workforce to Available Workforce Workforce by Sex The County’s workforce is predominantly male, while the available workforce is predominantly female. Males comprise 53% of the County’s workforce and 47.5% of the available workforce. Females comprise 47% of the County’s workforce and 52.5% of the available workforce. The County’s female workforce is under- represented by 5.5%. Figure 1: Workforce for All Job Categories by Sex in 2021 Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or seeking employment, excluding those in the Armed Services. 53% 47% County Workforce Male Female 47.5% 52.5% Available Workforce Male Female EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 16 The County’s male workforce exceeds available workforce in Professionals by 31.2% and Service/Maintenance by 5%. The County’s male workforce is under-represented in Officials/Administrators by 4.4%, Technician by 9.5%, Protective Services by 13%, Administrative Support by 11.5%, and Skilled Craft by 27.2%. Figure 2: Male Workforce by Job Category in 2021 Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or seeking employment, excluding those in the Armed Services. 55.0% 68.8% 40.0% 70.6% 10.3% 71.4% 70.8% 59.4% 37.6% 49.5% 83.6% 21.8% 98.6% 65.8% Officials/Administrators Professionals Technicians Protective Services Administrative Support Skilled Craft Service/Maintenance County Workforce Available Workforce EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 17 The County’s female workforce exceeds available workforce in Officials/Administrators 4.4%, Technicians by 9.5%, Administrative Support by 11.5%, and Skilled Craft by 27.2%. The County’s female workforce is under- represented in Professionals by 31.1% and Service/Maintenance by 5%. Figure 3: Female Workforce by Job Category in 2021 Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or seeking employment, excluding those in the Armed Services. 45.0% 31.3% 60.0% 29.4% 89.7% 28.6% 29.2% 40.6% 62.4% 50.5% 16.4% 78.2% 1.4% 34.2% Officials/Administrators Professionals Technicians Protective Services Administrative Support Skilled Craft Service/Maintenance County Workforce Available Workforce EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 18 Workforce by Race and Ethnicity The County’s workforce and available workforce are predominantly White. The County’s racial/ethnic workforce exceeds available workforce in Whites by 3%, Blacks by 3.2%, and American Indian or Alaska Natives by 0.6%. The County’s racial/ethnic workforce is under-represented in Asians by 0.7%, Hispanics by 5.5%, and Others by 0.8%. Figure 4: Workforce for All Job Categories by Race and Ethnicity in 2021 Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or seeking employment, excluding those in the Armed Services. 57.3% 38.4% 0.6% 0.3% 0.3% 3.2% 0.0% 54.3% 35.2% 0.0% 1.0% 0.0% 8.7% 0.8% White Black or African American American Indian or Alaska Native Asian Native Hawaiian or Other Pacific Islander Hispanic or Latino Other County Workforce Available Workforce EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 19 Whites represent 57.3% of the County’s workforce and 54.3% of the available workforce. The County’s White workforce exceeds available workforce in Technicians by 20.5%, Protective Services by 13.6%, Skilled Craft by 22.7%, and Service/Maintenance by 7.7%. The County’s White workforce is under-represented in Officials/Administrators by 41.1%, Professionals by 6.8%, and Administrative Support by 3.5%. Figure 5: White Workforce by Job Category in 2021 Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or seeking employment, excluding those in the Armed Services. 42.5% 71.9% 80.0% 61.4% 54.0% 85.7% 37.5% 84.2% 78.7% 59.5% 47.8% 57.5% 63.0% 29.8% Officials/Administrators Professionals Technicians Protective Services Administrative Support Skilled Craft Service/Maintenance County Workforce Available Workforce EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 20 Blacks represent 38.4% of the County’s workforce and 35.2% of the available workforce. The County’s Black workforce exceeds available workforce in Officials/Administrators by 43.8%, Professionals by 8%, Skilled Craft by 7.5%, and Service/Maintenance by 3.9%. The County’s Black workforce is under-represented in Technicians by 8.8%, Protective Services by 15.6%, and Administrative Support by 1.9%. Figure 6: Black or African American Workforce by Job Category in 2021 Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or seeking employment, excluding those in the Armed Services. 52.5% 21.9% 20.0% 36.6% 36.8% 14.3% 62.5% 8.7% 13.9% 28.8% 52.2% 38.7% 6.8% 58.6% Officials/Administrators Professionals Technicians Protective Services Administrative Support Skilled Craft Service/Maintenance County Workforce Available Workforce EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 21 American Indians or Alaska Natives represent 0.6% of the County’s workforce and 0% of the available workforce. The County’s American Indian or Alaska Native workforce exceeds available workforce in Officials/Administrators by 2.5% and Professionals by 3.1%. The County’s American Indian or Alaska Native workforce is not represented at all in Technicians, Protective Services, and Administrative Support, Skilled Craft by, and Service/Maintenance Figure 7: American Indian or Alaska Native Workforce by Job Category in 2021 Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or seeking employment, excluding those in the Armed Services. 2.5% 3.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Officials/Administrators Professionals Technicians Protective Services Administrative Support Skilled Craft Service/Maintenance County Workforce Available Workforce EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 22 Asians represent 0.3% of the County’s workforce and 1% of the available workforce. The County’s Asian workforce exceeds available workforce in Officials/Administrators by 2.5%. The County’s Asian workforce is not represented at all in Professionals, Technicians, Protective Services, and Administrative Support, Skilled Craft by, and Service/Maintenance. Among these, the under-representations are 6.4% in Professionals and -1.1% in Administrative Support. Figure 8: Asian Workforce by Job Category in 2021 Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or seeking employment, excluding those in the Armed Services. 2.5% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 6.4% 0.0% 0.0% 1.1% 0.0% 0.0% Officials/Administrators Professionals Technicians Protective Services Administrative Support Skilled Craft Service/Maintenance County Workforce Available Workforce EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 23 Native Hawaiians or Other Pacific Islanders represent 0.3% of the County’s workforce and 0% of the available workforce. The County’s Native Hawaiian or Other Pacific Islander workforce exceeds available workforce in Professionals by 3.1%. The County’s Asian workforce is not represented at all in Officials/Administrators, Technicians, Protective Services, and Administrative Support, Skilled Craft by, and Service/Maintenance. Among these, the under-representations are 0.2% in Administrative Support. Figure 9: Native Hawaiian or Other Pacific Islander Workforce by Job Category for in 2021 Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or seeking employment, excluding those in the Armed Services. 0.0% 3.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.2% 0.0% 0.0% Officials/Administrators Professionals Technicians Protective Services Administrative Support Skilled Craft Service/Maintenance County Workforce Available Workforce EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024 24 Hispanics represent 3.2% of the County’s workforce and 8.7% of the available workforce. The County’s Hispanic workforce exceeds available workforce in Protective Services by 2% and Administrative Support by 6.8%. The County’s Hispanic workforce is not represented at all in Officials/Administrators, Professionals, Technicians, Skilled Craft, and Service/Maintenance, with under representation by 4.7%, 1%, 11.7%, 30.1%, and 9.9% respectively. Figure 10: Hispanic or Latino Workforce by Job Category in 2021 Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or seeking employment, excluding those in the Armed Services. 0.0% 0.0% 0.0% 2.0% 9.2% 0.0% 0.0% 4.7% 1.0% 11.7% 0.0% 2.4% 30.1% 9.9% Officials/Administrators Professionals Technicians Protective Services Administrative Support Skilled Craft Service/Maintenance County Workforce Available Workforce EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 25 Summary of Workforce Utilization Table 7: Workforce Utilization Analysis 2021 Job Categories Male Female White Black or African American American Indian or Alaska Native Asian Native Hawaiian or Other Pacific Islander Hispanic or Latino Other White Black or African American American Indian or Alaska Native Asian Native Hawaiian or Other Pacific Islander Hispanic or Latino Other Officials/Administrators Workforce # 12 10 0 0 0 0 0 5 11 1 1 0 0 0 Workforce % 30.0% 25.0% 0.0% 0.0% 0.0% 0.0% 0.0% 12.5% 27.5% 2.5% 2.5% 0.0% 0.0% 0.0% CLS # 460 4 0 0 0 20 20 255 70 0 0 0 20 0 CLS % 54.2% 0.5% 0.0% 0.0% 0.0% 2.4% 2.4% 30.0% 8.2% 0.0% 0.0% 0.0% 2.4% 0.0% Utilization % -24.2% 24.5% 0.0% 0.0% 0.0% -2.4% -2.4% -17.5% 19.3% 2.5% 2.5% 0.0% -2.4% 0.0% Professionals Workforce # 17 4 0 0 1 0 0 6 3 1 0 0 0 0 Workforce % 53.1% 12.5% 0.0% 0.0% 3.1% 0.0% 0.0% 18.8% 9.4% 3.1% 0.0% 0.0% 0.0% 0.0% CLS # 290 50 0 30 0 10 0 505 90 0 35 0 0 0 CLS % 28.7% 5.0% 0.0% 3.0% 0.0% 1.0% 0.0% 50.0% 8.9% 0.0% 3.5% 0.0% 0.0% 0.0% Utilization % 24.4% 7.5% 0.0% -3.0% 3.1% -1.0% 0.0% -31.3% 0.5% 3.1% -3.5% 0.0% 0.0% 0.0% Technicians Workforce # 2 0 0 0 0 0 0 2 1 0 0 0 0 0 Workforce % 40.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.0% 20.0% 0.0% 0.0% 0.0% 0.0% 0.0% CLS # 135 75 0 0 0 65 0 195 85 0 0 0 0 0 CLS % 24.3% 13.5% 0.0% 0.0% 0.0% 11.7% 0.0% 35.1% 15.3% 0.0% 0.0% 0.0% 0.0% 0.0% Utilization % 15.7% -13.5% 0.0% 0.0% 0.0% -11.7% 0.0% 4.9% 4.7% 0.0% 0.0% 0.0% 0.0% 0.0% Protective Services Workforce # 84 22 0 0 0 2 0 10 34 0 0 0 1 0 Workforce % 54.9% 14.4% 0.0% 0.0% 0.0% 1.3% 0.0% 6.5% 22.2% 0.0% 0.0% 0.0% 0.7% 0.0% CLS # 150 130 0 0 0 0 0 10 45 0 0 0 0 0 CLS % 44.8% 38.8% 0.0% 0.0% 0.0% 0.0% 0.0% 3.0% 13.4% 0.0% 0.0% 0.0% 0.0% 0.0% Utilization % 10.1% -24.4% 0.0% 0.0% 0.0% 1.3% 0.0% 3.6% 8.8% 0.0% 0.0% 0.0% 0.7% 0.0% EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 26 Job Categories Male Female White Black or African American American Indian or Alaska Native Asian Native Hawaiian or Other Pacific Islander Hispanic or Latino Other White Black or African American American Indian or Alaska Native Asian Native Hawaiian or Other Pacific Islander Hispanic or Latino Other Paraprofessional Workforce # 0 0 0 0 0 0 0 0 1 0 0 0 0 0 Workforce % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 0.0% 0.0% 0.0% 0.0% 0.0% CLS # n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a CLS % n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Utilization % n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Administrative Support Workforce # 7 2 0 0 0 0 0 40 30 0 0 0 8 0 Workforce % 8.0% 2.3% 0.0% 0.0% 0.0% 0.0% 0.0% 46.0% 34.5% 0.0% 0.0% 0.0% 9.2% 0.0% CLS # 400 65 0 25 4 15 0 945 840 0 0 0 40 4 CLS % 17.1% 2.8% 0.0% 1.1% 0.2% 0.6% 0.0% 40.4% 35.9% 0.0% 0.0% 0.0% 1.7% 0.2% Utilization % -9.1% -0.5% 0.0% -1.1% -0.2% -0.6% 0.0% 5.6% -1.4% 0.0% 0.0% 0.0% 7.5% -0.2% Skilled Craft Workforce # 4 1 0 0 0 0 0 2 0 0 0 0 0 0 Workforce % 57.1% 14.3% 0.0% 0.0% 0.0% 0.0% 0.0% 28.6% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% CLS # 675 75 0 0 0 330 0 15 0 0 0 0 0 0 CLS % 61.6% 6.8% 0.0% 0.0% 0.0% 30.1% 0.0% 1.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Utilization % -4.5% 7.4% 0.0% 0.0% 0.0% -30.1% 0.0% 27.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Service/Maintenance Workforce # 4 13 0 0 0 0 0 5 2 0 0 0 0 0 Workforce % 16.7% 54.2% 0.0% 0.0% 0.0% 0.0% 0.0% 20.8% 8.3% 0.0% 0.0% 0.0% 0.0% 0.0% CLS # 595 1065 0 0 0 160 0 230 555 0 0 0 115 45 CLS % 21.5% 38.5% 0.0% 0.0% 0.0% 5.8% 0.0% 8.3% 20.1% 0.0% 0.0% 0.0% 4.2% 1.6% Utilization % -4.9% 15.6% 0.0% 0.0% 0.0% -5.8% 0.0% 12.5% -11.7% 0.0% 0.0% 0.0% -4.2% -1.6% Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or seeking employment, excluding those in the Armed Services. EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 27 Table 8: Significant Workforce Underutilization 2021 Job Categories Male Female White Black or African American American Indian or Alaska Native Asian Native Hawaiian or Other Pacific Islander Hispanic or Latino Other White Black or African American American Indian or Alaska Native Asian Native Hawaiian or Other Pacific Islander Hispanic or Latino Other Officials/ Administrators ✓ ✓ ✓ ✓ ✓ Professionals ✓ ✓ ✓ ✓ Technicians ✓ ✓ Protective Services ✓ Paraprofessional Administrative Support ✓ ✓ ✓ ✓ ✓ ✓ ✓ Skilled Craft ✓ ✓ Service/ Maintenance ✓ ✓ ✓ ✓ ✓ Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or seeking employment, excluding those in the Armed Services. EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 28 Comparison of County Workforce between 2011 and 2021 Workforce by Sex A comparison of County’s workforce between 2011 and 2021 reflects predominant males. However, the County saw an increase of female workforce from 41.9% in 2011 to 47% in 2021. Figure 11: Workforce for All Job Categories by Sex between 2011 and 2021 Source: Jasper County EE04 Report 2011 and 2021 58.1% 41.9% County Workforce 2011 Male Female 53% 47% County Workforce 2021 Male Female EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 29 For males, there was a decrease in Officials/Administrators, Professionals, Paraprofessionals, and Skilled Craft; while there was an increase in Technicians, Administrative Support, and Service/Maintenance. A representation of males in Protective Services was roughly unchanged. Figure 12: Male Workforce by Job Category between 2011 and 2021 Source: Jasper County EE04 Report 2011 and 2021 66.7% 75.9% 20.0% 70.5% 57.4% 5.7% 85.4% 0.0% 55.0% 68.8% 40.0% 70.6% 0.0% 10.3% 71.4% 70.8% Officials/Administrators Professionals Technicians Protective Services Paraprofessionals Administrative Support Skilled Craft Service/Maintenance 2011 2021 EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 30 For females, there was a decrease in Technicians and Administrative Support, while there was an increase in Officials/Administrators, Professionals, Paraprofessionals, Skilled Craft, and Service/Maintenance. A representation of females in Protective Services was roughly unchanged. Figure 13: Female Workforce by Job Category between 2011 and 2021 Source: Jasper County EE04 Report 2011 and 2021 33.3% 24.1% 80.0% 29.5% 42.6% 94.3% 14.6% 0.0% 45.0% 31.3% 60.0% 29.4% 100.0% 89.7% 28.6% 29.2% Officials/Administrators Professionals Technicians Protective Services Paraprofessionals Administrative Support Skilled Craft Service/Maintenance 2011 2021 EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 31 Workforce by Race and Ethnicity A comparison of County’s workforce between 2011 and 2021 reflects predominant Whites with roughly unchanged representation from 57.3% in 2011 to 57.5% in 2021. The County saw an increase of Black workforce from 41.9% in 2011 to 47% in 2021. For the same period, the representation of other races and ethnicity decreased: American Indians and Alaska Natives (0% to 0.6%), Asians or Native Hawaiians or Other Pacific Islanders (0.3% to 0.6%), and Hispanics (0.7% to 3.2%). Figure 14: Workforce for All Job Categories by Race and Ethnicity between 2011 and 2021 Source: Jasper County EE04 Report 2011 and 2021 57.5% 41.5% 0.0% 0.3% 0.7% 57.3% 38.4% 0.6% 0.6% 3.2% White Black or African American American Indian or Alaska Native Asian or Native Hawaiian or Other Pacific Islander Hispanic or Latino County Workforce 2011 County Workforce 2021 EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 32 For Whites, there was a decrease in Officials/Administrators, Professionals, Paraprofessionals, and Administrative Support; while there was an increase in Technicians, Protective Services, and Service/Maintenance. In 2011, Whites were not represented at all in Service/Maintenance. In 2021, Whites were not represented at all in Paraprofessionals. Figure 15: White Workforce by Job Category between 2011 and 2021 Source: Jasper County EE04 Report 2011 and 2021 75.0% 89.7% 40.0% 32.6% 75.9% 71.7% 41.5% 0.0% 42.5% 71.9% 80.0% 61.4% 0.0% 54.0% 85.7% 37.5% Officials/Administrators Professionals Technicians Protective Services Paraprofessionals Administrative Support Skilled Craft Service/Maintenance County Workforce 2011 County Workforce 2021 EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 33 For Blacks, there was a decrease in Technicians, Protective Services, and Skilled Craft; while there was an increase in Officials/Administrators, Professionals, Paraprofessionals, Administrative Support, and Service/Maintenance. In 2011, Blacks were not represented at all in Service/Maintenance. Figure 16: Black or African American Workforce by Job Category between 2011 and 2021 Source: Jasper County EE04 Report 2011 and 2021 20.8% 10.3% 60.0% 65.3% 24.1% 28.3% 58.5% 0.0% 52.5% 21.9% 20.0% 36.6% 100.0% 36.8% 14.3% 62.5% Officials/Administrators Professionals Technicians Protective Services Paraprofessionals Administrative Support Skilled Craft Service/Maintenance County Workforce 2011 County Workforce 2021 EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 34 In 2011, American Indians or Alaska Natives were not represented at all in all job categories. In 2021, they were represented only Officials/Administrators and Professionals. Figure 17: American Indian or Alaska Native Workforce by Job Category between 2011 and 2021 Source: Jasper County EE04 Report 2011 and 2021 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.5% 3.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Officials/Administrators Professionals Technicians Protective Services Paraprofessionals Administrative Support Skilled Craft Service/Maintenance County Workforce 2011 County Workforce 2021 EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 35 In 2011 and 2021, Asians or Native Hawaiians or Other Pacific Islanders were not represented at all in all job categories, except for Officials/Administrators (4.2% in 2011 and 2.5% in 2021). Figure 18: Asian or Native Hawaiian or Other Pacific Islander Workforce by Job Category between 2011 and 2021 Source: Jasper County EE04 Report 2011 and 2021 4.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.5% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Officials/Administrators Professionals Technicians Protective Services Paraprofessionals Administrative Support Skilled Craft Service/Maintenance County Workforce 2011 County Workforce 2021 EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 36 In 2011 and 2021, Hispanics were not represented at all in all job categories, except for Protective Services (2.1% in 2011 and 2% in 2021) and Administrative Support (0% in 2011 and 9.2% in 2021). Figure 19: Hispanic or Latino Workforce by Job Category between 2011 and 2021 Source: Jasper County EE04 Report 2011 and 2021 0.0% 0.0% 0.0% 2.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.0% 0.0% 9.2% 0.0% 0.0% Officials/Administrators Professionals Technicians Protective Services Paraprofessionals Administrative Support Skilled Craft Service/Maintenance County Workforce 2011 County Workforce 2021 EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 37 Summary of Workforce Utilization Table 9: Workforce Utilization Analysis between 2011 and 2021 Job Categories Male Female White Black or African American American Indian or Alaska Native Asian or Native Hawaiian or Other Pacific Islander Hispanic or Latino White Black or African American American Indian or Alaska Native Asian or Native Hawaiian or Other Pacific Islander Hispanic or Latino Officials/Administrators Workforce 2011 % 58.3% 8.3% 0.0% 0.0% 0.0% 16.7% 12.5% 0.0% 4.2% 0.0% Workforce 2021 % 30.0% 25.0% 0.0% 0.0% 0.0% 12.5% 27.5% 2.5% 2.5% 0.0% Change in Utilization -28.3% 16.7% 0.0% 0.0% 0.0% -4.2% 15.0% 2.5% -1.7% 0.0% Professionals Workforce 2011 % 72.4% 3.4% 0.0% 0.0% 0.0% 17.2% 6.9% 0.0% 0.0% 0.0% Workforce 2021 % 53.1% 12.5% 0.0% 3.1% 0.0% 18.8% 9.4% 3.1% 0.0% 0.0% Change in Utilization -19.3% 9.1% 0.0% 3.1% 0.0% 1.6% 2.5% 3.1% 0.0% 0.0% Technicians Workforce 2011 % 0.0% 20.0% 0.0% 0.0% 0.0% 40.0% 40.0% 0.0% 0.0% 0.0% Workforce 2021 % 40.0% 0.0% 0.0% 0.0% 0.0% 40.0% 20.0% 0.0% 0.0% 0.0% Change in Utilization 40.0% -20.0% 0.0% 0.0% 0.0% 0.0% -20.0% 0.0% 0.0% 0.0% Protective Services Workforce 2011 % 29.5% 38.9% 0.0% 0.0% 2.1% 3.2% 26.3% 0.0% 0.0% 0.0% Workforce 2021 % 54.9% 14.4% 0.0% 0.0% 1.3% 6.5% 22.2% 0.0% 0.0% 0.7% Change in Utilization 25.4% -24.5% 0.0% 0.0% -0.8% 3.3% -4.1% 0.0% 0.0% 0.7% Paraprofessional Workforce 2011 % 53.7% 3.7% 0.0% 0.0% 0.0% 22.2% 20.4% 0.0% 0.0% 0.0% Workforce 2021 % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 0.0% 0.0% 0.0% Change in Utilization -53.7% -3.7% 0.0% 0.0% 0.0% -22.2% 79.6% 0.0% 0.0% 0.0% EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 38 Job Categories Male Female White Black or African American American Indian or Alaska Native Asian or Native Hawaiian or Other Pacific Islander Hispanic or Latino White Black or African American American Indian or Alaska Native Asian or Native Hawaiian or Other Pacific Islander Hispanic or Latino Administrative Support Workforce 2011 % 5.7% 0.0% 0.0% 0.0% 0.0% 66.0% 28.3% 0.0% 0.0% 0.0% Workforce 2021 % 8.0% 2.3% 0.0% 0.0% 0.0% 46.0% 34.5% 0.0% 0.0% 9.2% Change in Utilization 2.3% 2.3% 0.0% 0.0% 0.0% -20.0% 6.2% 0.0% 0.0% 9.2% Skilled Craft Workforce 2011 % 36.6% 48.8% 0.0% 0.0% 0.0% 4.9% 9.8% 0.0% 0.0% 0.0% Workforce 2021 % 57.1% 14.3% 0.0% 0.0% 0.0% 28.6% 0.0% 0.0% 0.0% 0.0% Change in Utilization 20.5% -34.5% 0.0% 0.0% 0.0% 23.7% -9.8% 0.0% 0.0% 0.0% Service/Maintenance Workforce 2011 % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Workforce 2021 % 16.7% 54.2% 0.0% 0.0% 0.0% 20.8% 8.3% 0.0% 0.0% 0.0% Change in Utilization 16.7% 54.2% 0.0% 0.0% 0.0% 20.8% 8.3% 0.0% 0.0% 0.0% Source: Jasper County EE04 Report 2011 and 2021 EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 39 Table 10: Significant Improvement of Workforce Utilization between 2011 and 2021 Job Categories Male Female White Black or African American American Indian or Alaska Native Asian or Native Hawaiian or Other Pacific Islander Hispanic or Latino White Black or African American American Indian or Alaska Native Asian or Native Hawaiian or Other Pacific Islander Hispanic or Latino Officials/Administrators ✓ ✓ ✓ Professionals ✓ ✓ ✓ ✓ ✓ Technicians ✓ Protective Services ✓ ✓ ✓ Paraprofessional ✓ Administrative Support ✓ ✓ ✓ ✓ Skilled Craft ✓ ✓ Service/Maintenance ✓ ✓ ✓ ✓ Source: Jasper County EE04 Report 2011 and 2021 EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 40 APPENDIX C: DEFINITIONS OF RACE/ETHNICITY CATEGORIES • White (Not Hispanic or Latino): A person having origins in any of the original people of Europe, the Middle East, or North Africa. • Black or African American (Not Hispanic or Latino): A person having origins in any of the black racial groups of Africa. • American Indian or Alaska Native (Not Hispanic or Latino): A person having origins in any of the original people of North and South America (including Central America), and who maintain tribal affiliation or community attachment. • Asian (Not Hispanic or Latino): A person having origins in any of the original people of the Far East, Southeast Asia, or the Indian Subcontinent, including, for example, Cambodia, China, India, Japan, Korea, Malaysia, Pakistan, the Philippine Islands, Thailand, and Vietnam. • Native Hawaiian or Other Pacific Islander (Not Hispanic or Latino): A person having origins in any of the people of Hawaii, Guam, Samoa, or other Pacific Islands. • Two or More Races (Not Hispanic or Latino): All persons who identify with more than one of the above five races (White, Black or African American, Native Hawaiian or Other Pacific Islander, Asian, American Indian or Alaska Native). • Hispanic or Latino: A person of Cuban, Mexican, Puerto Rican, South or Central American, or other Spanish culture or origin regardless of race. EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 41 APPENDIX D: DESCRIPTION OF JOB CATEGORIES • Officials/Administrators: Occupations in which employees set broad policies, exercise overall responsibility for execution of these policies, direct individual departments or special phases of the agency’s operations, or provide specialized consultation on a regional, district or area basis. Includes: department heads, bureau chiefs, division chiefs, directors, deputy directors, controllers, wardens, superintendents, sheriffs, police and fire chiefs and inspectors, examiners (bank, hearing, motor vehicle, warehouse), inspectors (construction, building, safety, rent-and-housing, fire, A.B.C. Board, license, dairy, livestock, transportation), assessors, tax appraisers and investigators, coroners, farm managers, and kindred workers. • Professionals: Occupations which require specialized and theoretical knowledge which is usually acquired through college training or through work experience and other training which provides comparable knowledge. Includes: personnel and labor relations workers, social workers, doctors, psychologists, registered nurses, economists, dietitians, lawyers, systems analysts, accountants, engineers, employment and vocational rehabilitation counselors, teachers or instructors, police and fire captains and lieutenants, librarians, management analysts, airplane pilots and navigators, surveyors and mapping scientists, and kindred workers. • Technicians: Occupations which require a combination of basic scientific or technical knowledge and manual skill which can be obtained through specialized post-secondary school education or through equivalent on-the-job training. Includes: computer programmers, drafters, survey and mapping technicians, licensed practical nurses, photographers, radio operators, technical illustrators, highway technicians, technicians (medical, dental, electronic, physical sciences), police and fire sergeants, inspectors (production or processing inspectors, testers and weighers), and kindred workers. • Protective Services: Occupations in which workers are entrusted with public safety, security and protection from destructive forces. Includes: police patrol officers, firefighters, guards, deputy sheriffs, bailiffs, correctional officers, detectives, marshals, harbor patrol officers, game and fish wardens, park rangers (except maintenance), and kindred workers. • Paraprofessionals: Occupations in which workers perform some of the duties of a professional or technician in a supportive role, which usually require less formal training and/or experience normally required for professional or technical status. Such positions may fall within an identified pattern of staff development and promotion under the New Careers concept, including research assistants, medical aides, child support workers, policy auxiliary welfare service aides, recreation assistants, homemaker aides, home health aides, library assistants and clerks, ambulance drivers and attendants, and kindred workers. • Administrative Support: Occupations in which workers are responsible for internal and external communication, recording and retrieval of data and/or information and other paperwork required in an office. Includes: bookkeepers, messengers, clerk-typists, stenographers, court transcribers, hearing reporters, statistical clerks, dispatchers, license distributors, payroll clerks, office machine and computer operators, telephone operators, legal assistants, sales workers, cashiers, toll collectors, and kindred workers. EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024 42 • Skilled Craft: Occupations in which workers perform jobs which require special manual skill and a thorough and comprehensive knowledge of the process involved in the work which is acquired through on-the-job training and experience or through apprenticeship or other formal training programs. Includes: mechanics and repairers, electricians, heavy equipment operators, stationary engineers, skilled machining occupations, carpenters, compositors and typesetters, power plant operators, water and sewage treatment plant operators, and kindred workers. • Service/Maintenance: Occupations in which workers perform duties which result in or contribute to the comfort, convenience, hygiene or safety of the general public or which contribute to the upkeep and care of buildings, facilities or grounds of public property. Workers in this group may operate machinery. Includes: chauffeurs, laundry and dry-cleaning operatives, truck drivers, bus drivers, garage laborers, custodial employees, gardeners and groundskeepers, refuse collectors, construction laborers, park rangers (maintenance), farm workers (except managers), craft apprentices/trainees/helpers, and kindred workers. Draft dated 4/29/24 {10090-106 / 00108279 / V2} _______________________________________________________________________________ _______________________________________________________________________________ ORDINANCE #O-2024-12 AN ORDINANCE AUTHORISING THE EXECUTION AND DELIVERY OF CERTAIN INSTRUMENTS RELATING TO THE ACQUISITION, CONSTRUCTION, RENOVATION, EQUIPPING, USE, AND LEASING OF CERTAIN COUNTY FACILITIES; APPROVING THE ISSUANCE OF ST. PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION INSTALLMENT PURCHASE REVENUE BONDS AND BOND ANTICIPATION NOTES ; CONSENTING TO THE FORM OF TRUST AGREEMENTS BETWEEN ST. PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION AND THE CORPORATE TRUSTEE; THE LEASE OF CERTAIN PERSONAL PROPERTY, REAL PROPERTY AND THE BUILDINGS AND OTHER SITE IMPROVEMENTS LOCATED THEREON, BY JASPER COUNTY, SOUTH CAROLINA TO ST. PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION, INCLUDING AUTHORISING THE EXECUTION AND DELIVERY OF A BASE LEASE AGREEMENT, BETWEEN JASPER COUNTY AND ST. PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION; AUTHORISING THE EXECUTION AND DELIVERY OF A PUBLIC FACILITIES PURCHASE AND OCCUPANCY AGREEMENT BETWEEN JASPER COUNTY AND ST. PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION; AUTHORISING THE EXECUTION AND DELIVERY OF A LEASE AGREEMENT BETWEEN JASPER COUNTY AND ST. PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION; AND OTHER MATTERS RELATING THERETO. _______________________________________________________________________________ _______________________________________________________________________________ {10090-106 / 00108279 / V2} TABLE OF CONTENTS (This Table of Contents for the Ordinance is for convenience of reference only and is not intended to define, limit, or describe the scope or intent of any provision of the Ordinance) Page Section 1. Approval of Leasing of New Facilities Real Property and Capital Projects by County; Approval and Execution of Base Lease Agreement. ................................... 2 Section 2. Approval of Purchase and Use of the New Facilities Real Property and Capital Projects by County; Approval and Execution of the Facilities Agreement. ................... 2 Section 3. Approval of Lease Purchase of the Capital Projects by County; Approval and Execution of the Lease Agreement. ................................................................................. 2 Section 4. Agreement to Accept Title to Capital Projects. ............................................................... 3 Section 5. Consent to Creation of Corporation ................................................................................. 3 Section 6. Consent to Trust Agreement ............................................................................................ 3 Section 7. Consent to Leasehold Mortgage. ..................................................................................... 3 Section 8. Consent to and Approval of Obligations ......................................................................... 3 Section 9. Use of Proceeds of the Obligations .................................................................................. 3 Section 10. Sale of Obligations; Approval and Execution of Purchase Agreements ........................ 4 Section 11. Approval of Offering Documents .................................................................................... 4 Section 12. Consent to Appointment of Trustee ................................................................................. 4 Section 13. Authorisation for Issuance and Sale of BANs. ................................................................ 4 Section 14. Execution of Closing Documents and Obligations ......................................................... 5 Section 15. Law and Place of Enforcement of the Ordinance ............................................................ 5 Section 16. Effective Date ................................................................................................................... 5 Section 17. Severability ....................................................................................................................... 5 Section 18. Repeal of Inconsistent Ordinances ................................................................................... 5 Section 19. No Personal Liability........................................................................................................ 5 Section 19. Effect of Article and Section Headings and Table of Contents ....................................... 6 {10090-106 / 00108279 / V2} AN ORDINANCE AUTHORISING THE EXECUTION AND DELIVERY OF CERTAIN INSTRUMENTS RELATING TO THE ACQUISITION, CONSTRUCTION, RENOVATION, EQUIPPING, USE, AND LEASING OF CERTAIN COUNTY FACILITIES; APPROVING THE ISSUANCE OF ST. PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION INSTALLMENT PURCHASE REVENUE BONDS AND BOND ANTICIPATION NOTES; CONSENTING TO THE FORM OF TRUST AGREEMENTS BETWEEN ST. PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION AND THE CORPORATE TRUSTEE; THE LEASE OF CERTAIN PERSONAL PROPERTY, REAL PROPERTY AND THE BUILDINGS AND OTHER SITE IMPROVEMENTS LOCATED THEREON, BY JASPER COUNTY, SOUTH CAROLINA TO ST. PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION, INCLUDING AUTHORISING THE EXECUTION AND DELIVERY OF A BASE LEASE AGREEMENT, BETWEEN JASPER COUNTY AND ST. PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION; AUTHORISING THE EXECUTION AND DELIVERY OF A PUBLIC FACILITIES PURCHASE AND OCCUPANCY AGREEMENT BETWEEN JASPER COUNTY AND ST. PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION; AUTHORISING THE EXECUTION AND DELIVERY OF A LEASE AGREEMENT BETWEEN JASPER COUNTY AND ST. PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION; AND OTHER MATTERS RELATING THERETO. WHEREAS, St. Peters Parish/Jasper County Public Facilities Corporation ( the “Corporation”) is a non-profit corporation formed under the provisions of Title 33, Chapter 31 of the Code of Laws of South Carolina 1976, as amended; and WHEREAS, the Corporation intends to finance a fleet of replacement pumper trucks for the Jasper County Fire -Rescue department (the “New Equipment”), and intends to develop and finance certain library facilities related to the Pratt Memorial Library (the “New Facilities”) located within, and to be used by, Jasper County, South Carolina (the “County”) on real property currently owned by the C ounty (the “New Facilities Real Property”); the undertaking to finance the New Equipment and to develop and finance the New Facilities is referred to herein to be known as the “Capital Projects;” and WHEREAS, the Corporation has agreed to enter into a Base Lease Agreement (the “Base Lease”), pursuant to which the C ounty will lease the New Facilities Real Property, including the improvements located thereon, or portions thereof; to the Corporation so that the Corporation may provide for the acquisition, construction, renovation, and equipping thereon of the New Facilities; and WHEREAS, in order to provide funds for the payment of the costs of the Capital Projects, the Corporation is arranging for the issuance of an aggregate of not exceeding $[16,400,000] Installment Purchase Revenue Bonds (the “Obligations”), in one or more series under and by the terms of one or more Trust Agreements (collectively, the “Trust Agreement”), by and between the Corporation and a trustee to be designated as provided herein (the “Trustee”); and {10090-106 / 00108279 / V2} 2 WHEREAS, the C ounty intends to make certain acquisition or lease -purchase payments (the “Acquisition Payments”) for the ac quisition or lease-purchase of the Capital Projects and, pending acquisition thereof, shall be entitled to the use and occupancy of t he New Facilities Real Property and the Capital Projects pursuant to the terms of the Public Facilities and Occupancy Agreement (the “Facilities Agreement”), between the Corporation and the C ounty and the Facilities Lease Agreement (the “Lease Agreement”) between the Corporation and the County; and WHEREAS, the rights to receive Acquisition Payments are being assigned to the Trustee under the Trust Agreement as security and the source of payment of the Obligations; and WHEREAS, the Corporation will grant to the Trustee a l easehold mortgage interest in its rights under the Base Lease Agreement as security for the Obligations pursuant to the Leasehold Mortgage and Security Agreement (the “Leasehold Mortgage”); and WHEREAS, the members of the Board of Directors of the Corporation propose to adopt a resolution approving the Base Lease, the Facilities Agreement, the Lease Agreement, the Trust Agreement, the Leasehold Mortgage, and the issuance and sale of the Obligations; NOW, THEREFORE, BE IT ENACTED BY THE COUNTY COUNCIL OF JASPER COUNTY, SOUTH CAROLINA, AS FOLLOWS: Section 1. Appr oval of Leasing of New Facilities Real Property and Capital Projects by County; Approval and Execution of Base Lease Agreement. The conveyance of a leasehold interest in the New Facilities Real Property and the Capital Projects, or any portions thereof, by the County to the Corporation pursuant to the terms of the Base Lease Agreement is hereby approved, and the form of the Base Lease Agreement as submitted herewith is hereby approved. The Chairman of the C ounty Council (the “Chairman”) is hereby authori sed and directed to execute and deliver the Base Lease Agreement, in substantially the form submitted herewith, with any changes, insertions, and omissions as may be approved by the Chairman , with the advice of counsel, his execution being conclusive evidence of his approval. Section 2. Appro val of Purchase and Use of the New Facilities Real Property and Capital Projects by County; Approval and Execution of the Facilities Agreement. The purchase and use of the New Facilities Real Property and the Capital Projects, or any portions thereof, by the County from the Corporation pursuant to the terms set forth in the Facilities Agreement is hereby approved, and the form of the Facilities Agreement as submitted herewith is hereby approved. The Chairman is hereby authori sed and directed to execute and deliver the Facilities Agreement, in substantially the form submitted herewith, with any changes, insertions, and omissions as may be approved by the Chairman, with the advice of counsel, his execution being conclusive evidence of his approval. Section 3. Appro val of Lease Purchase of the Capital Projects by County; Approval and Execution of the Lease Agreement. The lease purchase of the Capital Projects, or any portions thereof, by the County from the Corporation pursuant to the terms set forth in the Lease Agreement is hereby approved, and the form of the Lease Agreement as submitted herewith is hereby approved. The Chairman is hereby authorised and directed to execute and deliver the Lease {10090-106 / 00108279 / V2} 3 Agreement, in substantially the form submitted herewith, with any changes, insertions, and omissions as may be approved by the Chairman, with the advice of counsel, his execution being conclusive evidence of his approval. Section 4. Ag reement to Accept Title to Capital Projects. The County Council hereby agree to accept title to the Capital Projects and any other property financed by the Obligations or the BANs (as hereinafter defined), including any additions to the Capital Projects or that other property, when the Obligations are discharged. Section 5. Cons ent to Creation of Corporation. The County Council hereby confirm and ratify the creation of the Corporation and consent to and approve the undertaking by the Corporation respecting the Capital Projects. Section 6. Cons ent to Trust Agreement . The C ounty Council hereby consent to the Trust Agreement now before this meeting, with any changes as may be thereafter made as shall be in furtherance of the transactions contemplated therein and in this Ordinance and as shall not be inconsistent with or contrary to the matters contemplated herein. The C ounty Council hereby further consent to the execution and delivery of the Trust Agreement by the parties thereto. The County Council covenant to observe and comply with all provisions pertaining to the County in the Trust Agreement, including without limitation provisions concerning the use of proceeds of the Obligations. Section 7. Conse nt to Leasehold Mortgage. The County Council hereby consent to the Leasehold Mortgage now before this meeting, with any changes as may be thereafter made as shall be in furtherance of the transactions contemplated therein and in this Ordinance and as shall not be inconsistent with or contrary to the matters contemplated herein. The C ounty Council hereby further consent to the execution and delivery of the Leasehold Mortgage by the parties thereto. Section 8. Cons ent to and Approval of Obligations. The C ounty Council hereby consent to and approve the creation of the Corporation, the undertaking by the Corporation respecting the Capital Projects, and the issuance of the Obligations in the aggregate principal amount not to exceed $[16,400,000] ; provided, however, that the approval provided under the Ordinance for the issuance of Obligations to finance the New Facilities s hall not exceed $[5,600,000] and the approval provided hereunder for the issuance of Obligations to finance the New Equipment shall not exceed $[ 10,800,000]. The Obligations may be issued in one or more series over a period not to exceed five years, as approved by the County Administrator on behalf of the County; provided, however, that the initial series of Obligations or BANs (as hereinafter defined) shall be issued within one year of the date of enactment of this Ordinance. Section 9. Us e of Proceeds of the Obligations. The proceeds of the Obligations, net of underwriter’s discount as provided in the respective bond purchase agreement, shall be applied, as provided in the Trust Agreement, ( a) to provide the amounts necessary for the acquisition, construction, renovation, and equipping of the Capital Projects (including any capitalized interest), (b) to fund any necessary reserve fund for the Obligations, and (c) to pay costs of issuance of the Obligations. Proceeds of the Obligations may be applied to refund BANs (as hereinafter defined) {10090-106 / 00108279 / V2} 4 or other obligations of the County the proceeds of which were applied as described in this Section 9. Section 10. S ale of Obligations; Approval and Execution of Purchase Agreements. The Obligations shall be sold from time to time as approved by the County Administrator to an investment banking firm or firms or other institutional lenders or investors as designated by the County Administrator as in the best interest of the County, pursuant to the terms of p urchase agreements for a price as approved by the County Administrator . The County Administrator is hereby authorised and directed to execute and deliver the respective purchase agreement for any series of Obligations, in the form as may be approved by the County Administrator subject to the provisions hereof, with the advice of counsel , his execution being conclusive evidence of his approval. Section 11. A pproval of Offering Document s. The preparation and use of offering documents, if deemed necessary by the County Administrator in the offering and sale of any series of Obligations, are hereby authorised, confirmed, and ratified. Section 12. C onsent to Appointment of Trustee . The C ounty Administrator is hereby authorised and directed to approve the appointment by the Corporation of one or more corporate trustees, as Trustee, Registrar, and Paying Agent under the Trust Agreement. Section 13. Aut horisation for Issuance and Sale of BANs. (a) Authorisation of BAN s. The County hereby consents to the issuance by the Corporation of one or more series of bond anticipation notes (the “BANs”) in order for the Corporation to borrow on a temporary basis in anticipation of the receipt of the proceeds of the Obligations; provided, however, that such BANs shall be discharged not later than five years after the date of issue of the first series of BANs by the Corporation. (b) Issuance of BANs. Th e County hereby approves the borrowing by the Corporation of not exceeding $[16,400,000] in anticipation of the issuance of the Obligations to be evidenced by bond anticipation notes in the aggregate principal amount of not exceeding $[16,400,000] outstanding at any one time, dated their date of issuance and maturing on a date approved by the County Administrator not later than one year after the date of issuance of such BANs. (c) Interest Rate on BANs . Th e BANs shall bear interest at the rate of interest as approved by the County Administrator. (d) Redemption of BANs. Th e BANs may be subject to redemption on the terms and at the prices as approved by the County Administrator prior to their issuance and delivery. (e) Sale of BANs. T he BANs shall be sold by the Corporation on the terms and conditions as the County Administrator determines to be in the best interest of the County. (f) Security for the BANs. F or the payment of the BANs, the Corporation shall pledge the proceeds derived from the sale of the Obligations and such other security as is provided {10090-106 / 00108279 / V2} 5 therefor in the Trust Agreement. (g) Additional BA Ns. The County hereby approves, subject to the limitations set forth in paragraph (b) of this Section 13, the issuance by the Corporation of additional BANs secured by a pledge of the proceeds of the Obligations upon maturity of the BANs in the event that Obligations are not issued by the maturity date of such BANs. Section 14. E xecution of Closing Documents . The Chairman, the County Administrator, and all other appropriate officials and employees of the C ounty are hereby authorised to execute, deliver, and receive any other agreements and documents as may be required by the County in order to carry out, give effect to, and consummate the transactions contemplated by the Base Lease Agreement , the Facilities Agreement, the Lease Agreement, and the purchase agreements (collectively, the “County Agreements”). Section 15. L aw and Place of Enforcement of the Ordinance. This Ordinance shall be construed and interpreted in accordance with the laws of the State of South Carolina and all suits and actions arising out of this Ordinance shall be instituted in a court of competent jurisdiction in the State of South Carolina. Section 16. E ffective Date. This Ordinance shall become effective immediately upon approval after receiving third reading by the County Council. Section 17. S everability. The provisions of this Ordinance are hereby declared to be severable and if any section, phrase, or provision shall for any reason be declared by a court of competent jurisdiction to be invalid or unenforceable, that declaration shall not affect the validity of the remainder of the sections, phrases, and provisions hereof. Section 18. R epeal of Inconsistent Ordinances . All ordinances, resolutions, and parts thereof in conflict herewith are, to the extent of the conflict, hereby repealed. Section 19. N o Personal Liability. No recourse shall be had for the enforcement of any obligation, covenant, promise, or agreement of the County contained in this Ordinance, the County Agreements, the Obligations or the BANs, against any member of the County Council, any officer or employee, as such, in his or her individual capacity, past, present, or future, of the County, either directly or through the County, whether by virtue of any constitutional provision, statute, or rule of law, or by the enforcement of any assessment or penalty or otherwise; it being expressly agreed and understood that this Ordinance , the C ounty Agreements, the Obligations, and the BANs are solely corporate obligations, and that no personal liability whatsoever shall attach to, or be incurred by, any member, officer, or employee as such, past, present, or future, of the County, either directly or by reason of any of the obligations, covenants, promises, or agreements, entered into between the County and the owners of the Obligations or the BANs or to be implied therefrom as being supplemental hereto or thereto; and that all personal liability of that character against every such member, officer, and employee is, by the enactment of this Ordinance and the execution of the County Agreements, the Obligations, and the BANs, and as a condition of, and as a part of the consideration for, the enactment of this Ordinance and the execution of the County Agreements, the Obligations, and the BANs , expressly waived and released. The immunity of the members, {10090-106 / 00108279 / V2} 6 officers, and employees, of the County under the provision contained in this Section shall survive the termination of this Ordinance. Section 20. E ffect of Article and Section Headings and Table of Contents. The heading or titles of the several Articles and Sections hereof, and any table of contents appended hereto or copies hereof, shall be solely for convenience of reference and shall not affect the meaning, construction, interpretation, or effect of this Ordinance. JASPER COUNTY, SOUTH CAROLINA (SEAL) By: Its: Chairman, County Council ATTEST: Clerk, County Council First Reading: April 1, 2024 Public Hearing June 3, 2024 Second Reading: May 6, 2024 Third Reading: June 3, 2024 1 STATE OF SOUTH CAROLINA JASPER COUNTY ORDINANCE #O-2024-14 ORDINANCE OF JASPER COUNTY COUNCIL An Ordinance authorizing the sale of a right of way easement over approximately 0.34 acres, 14,878 sq. ft., being a portion of TMS 042-00-05-040 adjacent t o the Interstate Highway I -95, to the South Carolina Department of Transportation in order to facilitate the widening, in exchange for the amount of $20, 900.00 in just compensation, and to authorize the Jasper County Administrator to execute such right of way easement and other documents as may be necessary and appropriate to effect the transfer to the South Carolina Department of Transportation , or its assigns, and matters related thereto. WHEREAS, The South Carolina Department of Transportation (“SCDOT”) is in the process of widening Interstate 95 (“I -95”) through Jasper County from 4 lanes to six lanes; and WHEREAS, in order to provide adequate area to perform the widening and its associated improvements, including storm drainage, SCDOT has determined that it is necessary to obtain for public use and purposes a right of way easement over a 0.34 acre, 14,878 sq. ft. portion of TMS 042 -00-05-040, being part of a 51.24 acre parcel owned by Jasper County; WHEREAS, SCDOT has performed an evaluation of the fair value of the property desired, and has made an offer of $20, 000.00 as just compensation; and WHEREAS, in accordance with South Carolina law, Jasper County Council must pass an ordinance authorizing the sale of real property , including easements; and WHEREAS, Jasper County Council finds th e terms of the SCDOT offer of compensation to be fair, equitable and in the best interests of the citizens of Jasper County; 2 NOW THEREFORE, BE IT RESOLVED by Jasper County Council, in council duly assembled and by the authority of the same: 1. Jasper County Council adopts the foregoing recitals as part of this Ordinance, and approves the sale of a right of way easement over the referenced County property consisting of 0.34 acres of land, as shown on the attached Exhibit “A”, for the sum of $20,900.00; 2. The Jasper County Administrator , with the assistance of the County Attorney, is further authorized to execute and deliver on beh alf of J asper County an executed right of way easement , in substantially the same form as set forth in the attached Exhibit “B”, as well as a closing statements and such other documents as may be necessary or desirable to accomplish the creation of the right of way easement over the referenced property in favor of the South Carolina Department of Transportation. 3. This Ordinance shall take effect upon approval of the Council. Done this ____ day of _______________, 2024. _________________________________ L. Martin Sauls, IV, Chairman ATTEST: _________________________________ Wanda H. Giles, Clerk to Council ORDINANCE # O-2024-14 First Reading: 04.01.2024 Second Reading: 06.03.2024 Public hearing: 06.03.2024 Adopted: _________ Reviewed for form and draftsmanship by the Jasper County Attorney. _______________________________________ David L. Tedder Date: _______________ 6 'x 4 ' B OX C U L V E R T 6 'x4 ' B O X C U L V E R T 6 'x4 ' D B L B O X C U L V E R T 6 'x4 ' D B L B OX C U L V E R T IE = 9 .9 4 ' IE = 9 .9 6 ' IE = 9 .8 4 ' IE = 9 .91 ' IE = 1 0 .1 0 ' IE = 1 0 .06 ' IE = 1 0 .06 ' IE = 9 .88 ' IE = 1 0 .12 ' IE = 10 .00 ' IE = 1 0 .2 3 ' IE = 10 .04 ' IE = 9 .94 ' IE = 9 .95 ' IE=9.83' IE=9.92' IE = 10 .30 ' IE=10.37' . L B D ' 4 x' 6 T R E V L U C X O B T R E V L U C X O B ' 4 x' 6 L/P WOVEN WIRE WOVEN WIRE C HA IN L INK FO FO V CC CT V S T-FO 2 4T-FO 24 T - F O 24 T - 5 0 T-100 S 22° 17' 53" W COUNTYPREPARED JASPER11 / 01 / 2023 SCALE FEET 050 100 SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION DRAWING 809-105-00. SUBMITTED TO THE REGISTER OF DEEDS IN COMPLIANCE WITH SCDOT STANDARD UPON COMPLETION OF CONSTRUCTION, A RECORDABLE RIGHT OF WAY PLAT SHALL BE FROM SCDOT HEADQUARTERS; 955 PARK STREET, COLUMBIA, SC 29201. ADDITIONALLY, IN DIRECT REFERENCE TO THE ENGINEERING PLANS, A COPY OF WHICH CAN BE OBTAINED THIS EXHIBIT IS A GRAPHIC REPRESENTATION OF THE "AREA OF ACQUISITION" AND IS EXHIBIT "A" Page 3 of 3 Pages AREA OF ACQUISITION FROM TRACT Proj. ID P040106 215.00' LT +31.43 230.00' LT +60.00 215.00' LT +60.00 230.00' LT +60.00 215.00' LT +60.00TRANS. PERM. EASEMENT 200.00' LT +03.71 230' PERM. EASEMENT 215' PERM. EASEMENT 215.00' LT +75.00 230.00' LT +75.00 TRANS. PERM. EASEMENT 215.00' LT +37.38 230' PERM. EASEMENT 200.00' LT +47.04 PRES. 175' R/W (27.301 1963) PRES. 175' R/W (27.301 1963) PRES. TRANS. R/W (2 7.3 0 1 1 9 6 3) 11' 11' 11' 11' 11' 11' 730 730 730 725 725 12' 12' 12' 12' 12' 720 720 65 70 S-422 EXIST. C/L STA. 63+77.77 BEGIN CONSTRUCTION S 22° 17' 53" W S 22° 17' 53" WS 22° 17' 53" W S 22° 17' 53" W 175.00' RT +91.27 (I-95 EXIST. C) C10' F17' F32' F32' F35' F31' F37' F31' F33' F33' F35' F29' F30' C9' C11' F19' F38'F35' F38' F35' F37'F19' F31'F35' F16' C10' F99' F99' F99' F102' F101' F104' F105' F104' F103' F103' F4' F7' F6' F5'F2' F5'F4' F2' F103' F100' F102'F102' F104' F108' F105' F106' F105' F102' F107' 12' 12' 12' 12' 12' 12' 725720 S-422 (MEDICAL CENTER DR.) I-95 SB I-95 I-95 NB I-95 I-95 SB I-95 NB S-422 (MEDICAL CENTER DR.) CONSTRUCTION ` EXISTING ` CONSTRUCTION ` 3 2 4 5 45 44 CONSTRUCTION ` CONSTRUCTION ` EXISTING ` PRES. 200' R/W (27.301 1963) PRES. 200' R/W (27.301 1963) PRES. 200' R/W (27.301 1963) 14,878 SF(0.34 AC) OBTAIN C/AC/AC/AC/A TSIXE C/AC/AC/AC/A TSIXE C/A TSIXE C/A TSIXE C/A TSIXE S-422 EXIST. C/L STA. 75+00.00 END CONSTRUCTION 75 N 2 01 / 24 / 2024 SCDOT R/W Form 801EXHI (10-2019) GRANTEE’S ADDRESS (Return Address): SCDOT, Director, Rights of Way, P. O. Box 191, Columbia, SC 29202-0191 Date Checked By Project ID No. P040106 Route I-95 Tract 2 Page 1 of 3 Pages THE STATE OF SOUTH CAROLINA RIGHT OF WAY EASEMENT COUNTY OF JASPER Approximate Survey Stations KNOW ALL MEN BY THESE PRESENTS, That I (or we) Jasper County, P .O. Box 1149, Ridgeland, South Carolina 29936 in consideration of the sum of Twenty Thousand Nine Hundred and No/100 ($20,900.00) Dollars, to me (or us) in hand paid, and other valuable consideration at and before the sealing and delivering thereof, by the South Carolina Department of Transportation, receipt of which is hereby acknowledged, have granted, bargained, sold and released, and by these presents do grant, give, bargain, sell and release, unto the said South Carolina Department of Transportation, its successors and assigns, an easement or right of way for the construction, improvement, operation and maintenance of a public road know n as a State Highway from 1.07 Miles North of US-278 (Exit 8) to 0.57 Miles Southwest of Georgia State Line on Route I-95, State and County aforesaid, as shown on plans prepared by the South Carolina Department of Transportation, upon and across the land which I (or we) may own, in whole or in part, between the survey stations referenced above and as depicted and described on the above reference plans together with, all and singular, the rights, members, hereditaments, and appurtenances thereunto belonging, or in any way incident or appertaining. The grantor expressly recognizes the possibility that the property herein may be used in the future by public utility or others granted the statutory right to use the right of way. SPECIAL PROVISIONS: The above consideration is for all that parcel or strip of land, to establish a right of way, containing 0.34 acre (14,878 square feet), more or less, and all improvements, thereon, if any, owned by Jasper County, shown as the “Area of Right of Way” on Exhibit A, attached hereto and made a part hereof. Tax Map No. 042-00-05-040 64+00 To 73+00 Lt. Road S-422 (Medical Center Dr.) Survey To To Road/Route Route I-95 Project ID No. P040106 Tract 2 SCDOT R/W Form 801EXHI (10-2019) Project ID No. P040106 Route I-95 Tract 2 Page 2 of 3 Pages TO HAVE AND TO HOLD, all and singular, the said easement or right of way and the rights hereinabove granted, unto the said South Carolina Department of Transportation, its successors and assigns forever for a public road, highway, other public transportation purposes or other public uses as are permitted within and in conjunction with highway rights of way and the grantors hereby dedicated their respective interest in said strip of land to public use for such purposes. It is agreed that buildings, fences, signs or other obstructions will not be erected by me (or us), my (or our) heirs, assigns or administrators within the limits of the right of way herein conveyed. IN WITNESS WHEREOF, I (or we) have hereunto set my (or our) hand(s) and seal(s) this ________ day of _________________________, in the year of our Lord, Two Thousand and Twenty Four. Signed, sealed and delivered in the presence of: Jasper County 1st Witness By: Andrew P. Fulghum Its: County Administrator Grantor (L.S.) 2nd Witness Grantor (L.S.) NOTE: All right of way agreements must be in writing and are subject to rejection by the South Carolina Department of Transportation. THE STATE OF SOUTH CAROLINA ) ) ACKNOWLEDGEMENT COUNTY OF JASPER ) The foregoing instrument was acknowledged before me this ____day of _______________, 2024 by Andrew P. Fulghum as its County Administrator on behalf of Jasper County. Signature of Notary Public Printed Name of Notary Public NOTARY PUBLIC FOR THE STATE OF SOUTH CAROLINA My Commission Expires: (Affix seal if outside SC) CSP PDD and DA Amendment Page 1 of 2 Jasper County Planning and Building Services 358 Third Avenue - Post Office Box 1659 Ridgeland, South Carolina 29936 Phone (843) 717-3650 Fax (843) 726-7707 Lisa Wagner, CFM Director of Planning and Building Services lwagner@jaspercountysc.gov Jasper County Council Staff Report Meeting Date: June 3, 2024 Project: Amendment of the CSP Planned Development District (PDD) Standards and the CSP Development Agreement (DA) Applicant: Peter Zadoretzky, Co-Manager, Conduit Street Partners Tax Map Number: 041-00-03-030 Submitted For: Public Hearing and 2nd Reading Recommendation: Planning Commission recommends approval of the proposed amendment to the CSP PDD Standards and the CSP DA. Description: The Applicant is requesting approval of an amendment to the CSP Planned Development District (PDD) Standards and the CSP Development Agreement (DA). The CSP PDD and DA was approved by Jasper County Council on June 27, 2022, as a single -family “for rent ” community, with a maximum density of 275 units, all to be situated on one parcel of land, consisting of 38.84 acres. The subject property is located along Independence Boulevard (Highway 278) between Brickyard Road and Hilton Head Lakes. The purpose of amending the CSP PDD and DA is to add language to allow the option of residential uses “for rent” or “for sale” that can be situated on “unsubdivided land” or “subdivided land”. Of course, the “for sale” option will be situated on subdivided lots. The approved CSP PDD and DA only assume residential units “for rent” that would be s ituated on one parcel of land . In order to support the residential u nits “for sale on subdivided lots ,” minimum lot size and setback s are included as part of the proposed amendment to the PDD Standards. Exhibit A – 2 of the Ordinance is a redline version of the amendment to the PDD Standards outlining the proposed changes. Exhibit A – 1 is a clean copy of the proposed amendment and if approved it will be recorded at the Register of Deeds Office. Exhibit B – 2 of the Ordinance is the redline version of t he proposed amendment to the DA and consists of very minimal changes, primarily to identify the community as a single-family community rather than a single family “rental” community. Exhibit B – 1 is the clean copy of the proposed amendment and if approved it will be recorded at the Register of Deeds Office. CSP PDD and DA Amendment Page 2 of 2 Analysis: The proposed amendment does not chang e the Concept Plan, the density, the land use, or the layout of the community , roads, and utilities. However, since the CSP PDD Standards and Development Agreement were previously adopted, any changes to either document must be approved by the County Council. Staff Recommendation: The Planning Commission reviewed the proposed amendment to the CSP PDD Standards at their April 9, 2024 meeting and recommends approval. Attachments: 1. Ordinance with Exhibits A – 1, A – 2, B – 1, and B – 2 2. Aerial Map STATE OF SOUTH CAROLINA JASPER COUNTY ORDINANCE #O-2024-15 AN ORDINANCE OF JASPER COUNTY COUNCIL To amend: (i) Ordinance O-2022-16 to adopt updated standards for the Planned Development District encompassing a 38.84 acre parcel located on U.S. Highway 278 (the “Property”); and (ii) Ordinance O-2022-14 to amend the development agreement (the “Development Agreement”) between Jasper County (the “County”) and Conduit Street Partners, LLC (“CSP” or the “Developer”) that governs CSP’s development of the Property into a 275- unit single-family residential community (the “Project”); in both cases to allow for the possibility that the Project may include not only “for rent” residential dwellings, but also “for sale” residential dwellings; and matters related thereto. WHEREAS, on June 27, 2022, the Jasper County Council passed Ordinance O-2022- 16, recorded in Book 1105, Page 481 of the Jasper County Register of Deeds (the “PDD Ordinance”), which ordinance adopted Planned Development District zoning for the Property, subject to the planned development district standards attached thereto (the “PDD Standards”), and the conceptual master plan attached as Exhibit B thereto. WHEREAS, on June 27, 2022, the Jasper County Council also passed Ordinance O- 2022-14, recorded in Book 1107, Page 1678 of the Jasper County Register of Deeds (the “Development Agreement Ordinance”, which ordinance approved the County’s entry into and execution of the Development Agreement that had been negotiated between the County and Conduit Street Partners, LLC, which Development Agreement governs the relationship between the County and the Developer with regard to the Project. WHEREAS, the Development Agreement Ordinance further contained a provision (in Paragraph 2 thereof) that instituted a deadline of June 30, 2023, by which the “Owner/Developer” (defined therein as CSP) must acquire legal title to the Property (the “Acquisition Deadline”); otherwise, the Development Agreement would automatically be null and void. 2 April 2024 WHEREAS, on October 11, 2022, the Jasper County Planning Commission approved the CSP Development PDD Master Plan (the “PDD Master Plan”), which contemplated a single family residential rental community containing 275 residential detached and attached units, and associated amenities. WHEREAS, on April 17, 2023, the Jasper County Council passed Ordinance O-2023- 06, recorded in Book 1123, Page 109 of the Jasper County Register of Deeds, which ordinance amended the Development Agreement Ordinance to extend the Acquisition Deadline through December 31, 2023, to give the Developer sufficient time to address permitting delays with outside agencies. WHEREAS, on October 16, 2023, the Jasper County Council passed Ordinance O-2023- 18, recorded in Book 1136, Page 407 of the Jasper County Register of Deeds, which ordinance amended the Development Agreement Ordinance to: (i) clarify that the entity to which the Property must be conveyed by the Acquisition Deadline includes the successors and assigns of CSP; (ii) specify certain forms of assignment that must be used for any assignment of CSP’s rights under the Development Agreement to any successor or assign of CSP; and (iii) extend the Acquisition Deadline through the date which is ninety (90) days after receipt of all final land use and development permit approvals, but no later than December 31, 2024. WHEREAS, the PDD Standards, the Development Agreement and the PDD Master Plan all include a description of the principal use of the Property as a single-family, “for rent” residential community, to be developed on a single, un-subdivided parcel of land that would be owned by the Developer. WHEREAS, since the inception of the Project, economic conditions and financing structures have changed significantly, to the degree that the investment and financing community has begun requiring additional “safety valve” options that would let lenders mitigate likely losses by selling off portions of their collateral, if necessary. WHEREAS, as a result of these changed financial circumstances, in order to attract quality financing and investment partners, CSP desires to be able to retain, as an alternative, a “for sale” use within the Project, which would include the ability to place residential dwellings on subdivided parcels (as opposed to a single, commonly-owned parcel as typically seen in a “for rent” context). WHEREAS, notwithstanding this request for “for sale” residential dwellings, CSP fully intends to develop the Project as a “for rent” residential community, with the “for sale” option serving only as the “safety valve” necessary to attract suitable financing and 3 April 2024 investment which would allow the Project to be developed as a “for rent” residential community, as originally and currently intended. WHEREAS, in order to contemplate the alternative “for sale” use within the Project, CSP desires to amend the PDD Standards, the Development Agreement and the PDD Master Plan to provide for items that would be applicable in a “for sale” context due to the possibility of subdivided lots within the Project, including standards such as setbacks, lot areas/widths, and other master plan details. WHEREAS, after giving the matter consideration, the Jasper County Council has determined that it would be appropriate to pass an ordinance which: (i) amends the PDD Ordinance (Ordinance O-2022-16) to adopt updated PDD Standards that address the “for sale” alternative use and provide the development standards applicable thereto (including those relating to any subdivided lots); and (ii) amends the Development Agreement Ordinance (Ordinance O-2022-14) to adopt an updated Development Agreement that addresses the “for sale” alternative use and the related matter of the subdivision of lots within the Property. NOW, THEREFORE, BE IT ORDAINED , by the Jasper County Council, duly assembled and with authority of same, that the above premises be incorporated by reference; and: 1. Ordinance O-2022-16 is hereby amended by substituting for the “Planned Development District Standards” attached thereto, the updated Planned Development District Standards attached hereto as Exhibit A-1 . The effect of such substitution shall be to accept those changes shown in red and underlined in the redlined version of the Planned Development District Standards attached hereto as Exhibit A-2. 2. Ordinance O-2022-14 is hereby amended by substituting for the “Development Agreement” attached thereto as Exhibit A, the updated Development Agreement attached hereto as Exhibit B-1. The effect of such substitution shall be to accept those changes shown in red and underlined in the redlined version of the Development Agreement attached hereto as Exhibit B-2. 3. If any section, clause, paragraph, sentence or phrase of this ordinance, or any application thereof, shall for any reason be held to be invalid or unconstitutional., 4 April 2024 the invalid section, clause paragraph, sentence, phrase or application shall in no way affect the remainder of this ordinance: and it is hereby declared to be the intention of the County Council that the remainder of this ordinance would have passed notwithstanding the invalidity or unconstitutionality of any section, clause paragraph, sentence, phrase or application thereof. 4. This ordinance shall take effect upon approval by Council. [Signatures Contained on Following Page] Signature Page to Ordinance O-2024-_____ Martin L. Sauls, IV Chairman ATTEST: Wanda H. Giles Clerk to Council , 2024 , 2024 , 2024 , 2024 ORDINANCE: -2024-__ First Reading: May 06 Public Hearing: June 03 Second Reading: June 03 Third Reading: Adopted: , 2024 _____________________________________________ Reviewed for form and draftsmanship by the Jasper County Attorney. __________________________ David Tedder Date FIRST EXHIBIT TO ORDINANCE EXHIBIT A-1 Updated Planned Development District Standards (CLEAN) [attached] SECOND EXHIBIT TO ORDINANCE EXHIBIT A-2 Updated Planned Development District Standards (REDLINED) [attached] THIRD EXHIBIT TO ORDINANCE EXHIBIT B-1 Updated Development Agreement (CLEAN) [attached] FOURTH EXHIBIT TO ORDINANCE EXHIBIT B-2 Updated Development Agreement (REDLINED) [attached] PDD EXHIBIT A-1 “CLEAN” CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 TABLE OF CONTENTS APPLICANT AND PLANNING TEAM……………………………………………………………………………………. 1 SECTION I – INTRODUCTION AND NARRATIVE………………………………………………………………… 2 A. The Property………………………………………………………………………………………………………………….. 2 B. Planned Development District Process……………………………………………………………………….. 3 C. Conceptual Master Plan………………………………………………………………………………………………… 4 D. Environmental Protection………………………………………………………………………………………………. 5 E. Water and Sewer Service……………………………………………………………………………………………… 5 F. Utility Service…………………………………………………………………………………………………………………… 5 G. Roadways and Traffic…………………………………………………………………………………………………….. 5 H. Tree Preservation and Replacement……………………………………………………………………………. 6 I. Parking…………………………………………………………………………………………………………………………….. 7 J. Stormwater Management………………………………………………………………………………………………. 7 K. Cultural and Historical Resources…………………………………………………………………………………. 7 L. Emergency Services………………………………………………………………………………………………………. 7 SECTION II – LAND USE DESIGNATION AND DEFINITIONS……………………………………………… 8 A. Introduction and Narrative………………………………………………………………………………………………. 8 B. Allowed Land Uses………………………………………………………………………………………………………….. 8 C. Allowed Density and Transfer of Density Between Planning Areas …………………………… 9 D. Definition of Land Use Terms and Density Terms ……………………………………………………….. 9 SCHEDULE OF EXHIBITS: Exhibit A Site Location Map Exhibit I FEMA Flood Zones Exhibit B Conceptual Master Plan Exhibit J BJWSA Availability to Serve Letter Exhibit C Property Aerial Exhibit K Dominion Availability to Serve Letter Exhibit D-1 Jasper County Zoning Map Exhibit L Palmetto Availability to Serve Letter Exhibit D-2 Hardeeville Zoning Map Exhibit M Hargray Availability to Serve Letter Exhibit E Wetlands Delineation Exhibit N Archaeological Report Exhibit F Boundary Survey Exhibit O Concept Development Schedule Exhibit G USDA Soils Data Exhibit P Fire Station and EMS Locations Exhibit H Topography Exhibit Q Thomas & Hutton Traffic Memo CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 1 APPLICANT AND PLANNING TEAM Owner………….………………………………………………………………………………………….Paul H. Anderson, Emily A.Tillman & John F. Anderson Developer / Applicant……………………………………..………………………………………………Conduit Street Partners, LLC Annapolis, MD Mr. Peter Zadoretzky Land Planner and Engineer………………………………………………………………………..Thomas & Hutton Engineering Savannah, GA Mr. Lamar Mercer, P.E. Mr. Scott Monson, P.E Carolina Engineering Consultants, Inc Beaufort, SC Mr. Jeff P. Ackerman, P.E Wetlands / Environmental Consultant and Permitting …………….Newkirk Environmental Consultants, Inc. Beaufort, SC Mr. Ashley Howell Archaeologist ……………………………………….………………………………………..…………….Brockington & Associates, Inc. Savannah, GA Mr. Alex Sweeney, MA, RPA Land Use Attorney / Legal Counsel ……………………………………………………..…………………..Bouhan Falligant LLP Savannah, GA John D. Northup III, Esq. CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 2 CSP DEVELOPMENT PLANNED DEVELOPMENT DISTRICT AND CONCEPTUAL MASTER PLAN SECTION I: INTRODUCTION AND NARRATIVE The Conduit Street Partners, LLC project currently consists of one parcel located in Jasper County, SC. Currently, the parcel is zoned Rural Preservation (“RP”) and is identified as PIN no. 041-00-03-030. The property is approximately 38.84 acres with substantial frontage on the north side of U.S. Highway 278 situated between the Hilton Head Lakes North development to its east and the Prime Storage facility to its west. The property is surrounded by City of Hardeeville land nearly all of which is zoned PDD with a very small area zoned GC (the Prime Storage property). The property has been in the Anderson Family estate for many years and was originally part of the J.A. Coleman Estate. Exhibit A Site Location Map is attached. The property is under agreement to be purchased from the Anderson family members by the Applicant, Conduit Street Partners, LLC, who are pursuing a new PDD zoning encompassing all the parcel to allow for the property to be deve loped under the stipulations set forth by the proposed PDD zoning in accordance with the Jasper County Zoning Ordinance (ZO) and Land Development Regulations (LDR) in effect at the time of submittal of this rezoning application . Upon approval, the benefits of the proposed PDD Standards shall apply to the Applicant I Owner and its successors and assignees. For the purposes of the P DD and Exhibit B Concept ual Master Plan, the parcel is hereby known as a single project ( “CSP Development ”) in this document henceforth. A. THE PROPERTY 1. The CSP Development property is a raw, unimproved forested , predominately uplands parcel in Jasper County. There are no nor have there ever been any existing buildings, structures, or other facilities on the property. The property is surrounded by PDD zoned Hardeeville land to its east, north and south and by Hardeeville GC zoned land to its west. It is bounded on its eastern side by the Hilton Head Lakes North development – a large, golf course residential community and one of the initial phases of the Hardeeville West Argent PDD development project. To the north and contiguous to the CSP Development is an undeveloped, principally forested, and regulated wetlands parcel which is also part of the West Argent PDD development project. West of the property is an existing Prime Storage facility situated on land located in Hardeeville and zoned GC. The southern property line of the property is frontage along the north side of highway U.S. 278 – a four lane divided, center median, limited access highway. And on the other/south side of U.S. 278 across the highway from the CSP Development there are two major Hardeeville PDD land parcels. One of the parcels is a part of the existing Latitude Margaritaville development and is at the present time planned to be Margaritaville’s future 70-acre retail/commercial phase. The second parcel that is to the west and contiguous with the Latitude Marga ritaville land is another very large Hardeeville PDD land parcel known as the Morgan PDD project . Both land tracts on the south side of U.S. 278 immediately across the highway from the proposed CSP Development are raw, unimproved but PDD zoned properties with existing Hardeeville CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 3 development agreements. Combined, the West Argent PDD, the Latitude Margaritaville PDD and the Morgan Tract PDD amount to approximately 10,500 acres of Hardeeville development parcels zoned PDD. The CSP Development 38.84-acre parcel has just under 2,700 feet of frontage along the north side of U.S. 278 and will access this highway at one central location in alignment with an existing median break. The CSP Development property will also have access to existing Brickyard Road at the road’s eastern termination point which is located at the property’s western property line. A Property Aerial (Exhibit C), a Jasper County Zoning Map (Exhibit D-1) and a Hardeeville Zoning Map (Exhibit D-2) are provided. 2. The proposed PDD consists of approximately 38.84 acres and has an anticipated area of approximately 37 acres of uplands and approximately 1.5 acres of jurisdictional wetlands, and 0.5 acres of non- jurisdictional wetlands (excluded waters – gum pond) based upon a preliminary wetland exhibit prepared by Newkirk Environmental, dated December 2021 (see Exhibit E Wetlands Delineation). The delineation of the wetlands within the property have been submitted to the Army Corps of Engineers to obtain a valid Jurisdictional Determination. The Conceptual Plan has taken into account the jurisdictional wetlands and has avoided any development impacts to these areas. The property does not have any critical area or frontage on salt marsh or creeks. 3. Exhibit F Boundary Survey depicts the property boundary. 4. Exhibit G USDA Soils Data depicts soils types of the property . 5. Exhibit H Topography depicts topographic information for the CSP Development property. GIS data topography was used for the purposes of the exhibit. Elevations on the site range from elevation 10.0 along its northern edge sloping quickly upwards to the property’s interior where grades are relatively flat averaging between elevations 18.0 to 20.0 with two small knolls on the west end of the property averaging elevation 24.0. Exhibit I FEMA Flood Zones Map depicts the 2019 FEMA flood zones which indicate that the property is in FEMA zone “X” which is defined to be an area of minimal flood hazard generally above or outside the 500- year flood level. Finished floor elevations of building structures will adhere to current Flood Zone requirements of the Jasper County Land Development Regulations. B. PLANNED DEVELOPMENT DISTRICT PROCESS 1. The Planned Development District (P DD) was established by the Jasper County to encourage flexibility in the development of land to promote its most appropriate, economical, and efficient use as well as to encourage creative design and produce a better environment particularly for large undeveloped tracts. The purpose of the PDD is to, among other things, permit development for specialized purposes which are planned and developed on a unified basis. In this case the specialized purpose is a first-class Single-Family Rental Home (“SFR”) community as proposed by Conduit Street Partners, LLC . The homes themselves will be of unique design, tasteful architecture and generally resemble single family detached and townhouse home types. The community will be under one ownership structure which will maintain most all aspects of the community, i.e., its infrastructure including its roads, the interior and exteriors of the homes and the grounds on which they are constructed including the community amenities and open spaces. CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 4 C. CONCEPTUAL MASTER PLAN It is anticipated that the Conduit Street Development property will be developed over a period of no more than four to five years in as many as two phases in accordance with the Conceptual Master Plan as set forth in this document and as the same may be supplemented by subsequent master and development plans submitted pursuant to the provisions of this PDD (see Exhibit N Concept Development Schedule). The Conceptual Master Plan sets forth the general scope of the development including number of allowed units , development standards, infrastructure requirements, and other guidelines. In addition to the Conceptual Master Plan, development of the Property will be controlled by other provisions of the PDD. The goal of this PDD is to produce a development that raises the quality of life and development standards in the area while also anticipating the County’s existing and future needs for naturally affordable single-family homes. The Conduit Street Development Conceptual Master Plan displays a general and privately owned and maintained roadway layout , general housing unit layout , open space areas as well as amenities that will serve the property. The final l ocations of these site elements may vary at the time of development permit. Proposed land uses in the development are detailed under Section 2 - Land Use Designation and Definitions. The Conceptual Master Plan seeks to maintain open space requirements set forth in Section II, D.3 of this PDD. The open space and amenities will be owned and maintained by the Applicant I Owner, or other legally designated entity. Property deeded to a governmental or private utility entity will be the maintenance responsibility of that entity. The Conceptual Master Plan and the provisions of this P DD will constitute the zoning for the Property and a waiver from the current Jasper County codes and regulations where differences occur. However, activities in the PDD shall conform to all other Jasper County Zoning Ordinance and Land Development Regulations where differences do not occur. The provisions of the Conceptual Master Plan shall apply to development of the property. In the event of a conflict , the hierarchy of documents will be the “to be approved”, (i ) Development Agreement (DA), (ii) the PDD and Conceptual Master Plan and, (iii) the Master Plan (MP). D. ENVIRONMENTAL PROTECTION 1. As part of the development process , the CSP Development will meet or exceed the stormwater management requirements of Jasper County, and the requirements of South Carolina Department of Health and Environmental Control (DHEC) and Office of Ocean and Coastal Resource Management (OCRM) .The Applicant I Owner will prepare stormwater management plans for the project as it is developed in acc ordance with a stormwater drainage master plan to be prepared by a professional engineering firm licensed by the State of South Carolina. The stormwater drainage master plan will address the hydrological characteristics of the entire site as well as adjacent drainage patterns of relative importance. The plan will address pre-development conditions and post -development stormwater management for flood control and sediment reduction. This plan will also address storm water quality through, among other things, the use of several types of BMP's (as established by the stormwater standards of the applicable state and federal governmental regulations) to enhance water quality and protect the adjacent wetlands. CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 5 2. Approximately 4 percent of the site consists of regulated jurisdictional wetlands. Exhibit E is a preliminary wetland plan prepared by Newkirk Environmental dated December 2021 which depicts the preliminary observation of wetlands vs uplands for the project area. The wetland plan has been submitted to the Army Corps of Engineers to obtain a jurisdictional determination prior to development of the property. 3. There will be no development impacts to the regulated jurisdictional wetlands. Subject to the approval of the Office of Ocean and Coastal Resource Management, the CSP Development will seek to remove/fill the non-regulated “gum pond” located in proximity to the project’s proposed main entrance off highway U.S. 278. E. WATER AND SEWER SERVICE Water and sewer service will be provided to the CSP Development by Beaufort Jasper Water and Sewer Authority. Preliminary planning for the water and sewer systems will be provided at the time of Initial Master Plan subm ittal to Jasper County. Preliminary discussions with Beaufort - Jasper Water and Sewer Authority (BJWSA) indicate a willingness to serve the property. BJWSA operates and maintains water and sewer systems within their service area upon completion by the developer and acceptance by the Authority. See Exhibit J BJWSA Availability to Serve Letter. F. UTILITY SERVICE 1 . The CSP Development property is in the service territory of Dominion Energy tor natural gas services, See Exhibit K Dominion Energy Availability to Serve Letter . The Applicant I Owner will coordinate with Dominion Energy regarding planning for the CSP Development project. 2. The CSP Development property is in the service territory of Palmetto Electric Cooperative tor electric services, See Exhibit L Palmetto Availability to Serve Letter. The Applicant I Owner will coordinate with Dominion Energy regarding planning for the CSP Development project. 3. Hargray or/or another licensed provider will provide internet and communication services to the CSP Development property . The Applicant/Owner will coordinate with the provider regarding planning and installation of these services. All servicing is anticipated to be via f iber optics cable to include broadband capability. See Exhibit M Hargray Availability to Serve Letter. 4. Other Utility services shall be provided by legally established ent ities at the discretion of the Applicant I Owner, provided such are in accordance with the franchising ordinances/licensing with the County. 5. Utilities will be underground except as reasonably necessary for above ground support facilities. G. ROADWAYS AND TRAFFIC 1. The CSP Development PDD shall have on-site roads designed and constructed to the standards of the Jasper County Land Development Regulations or other engineering standards CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 6 reasonably acceptable to the Jasper County Engineer. Roadway construction within SC DOT right-of-way's will be in accordance with SCD OT standards. Roadway section details wil l be submitted for review at time of development permit approval. Interconnectivity to other adjoining tracts of land is not proposed. Public access into or across other private developments will not be required. Roadway design standards may be modified subject to the approval of Jasper County to reduce environmental impacts provided safety concerns are not compromised. All onsite roads shall be privately owned and maintained. 2. The Appl icant I Owner intends to create up to three new points of vehicular access to existing public roads and highways for the project . The first is proposed to be a main entrance ingress and egress to U.S. 278 located and aligned with the center most existing highway median cut. The second access location i s anticipated to provide ingress and egress to U.S. 278 at the highway’s median cut fronting the eastern end of the property. The third point of vehicular connectivity is planned as a proposed connection with existing Brickyard Road at the roads point of termination at the property’s western property line and adjacent to the U.S. 278 right-of-way. A traffic plan study will be provided at the Master Plan stage. The traffic study shall be reviewed by the SCDOT and final configuration for the new accesses will be governed by the SC DOT. Final entrance configuration and locations w ill be based upon SCD OT guidelines at the time of development permit. 3. Access to the CSP Development PDD may be restricted and/or gated appropriately at the Applicant I Owner's discretion. Sidewalks and possibly trails shall be provided within the PDD at appropriate locations. The frequency and location of sidewalks or pathways shall be established based upon anticipated pedestrian circulation within the project. Sidewalks and trails shown on the Conceptual Master Plan are conceptual in nature and are subject to change over the course of the development permit process. 4. Notwithstanding the provisions of section G hereof, roadway design standards may be modified to reduce environmental impacts provided safety concerns are not compromised. To protect and preserve significant natural property attributes including avoiding wetland impacts, such design will be encouraged. 5. Reference Thomas & Hutton Traffic Memo Exhibit Q for preliminary traffic analysis and commentary concluding no material traffic impacts to existing road systems. 6. TREE PRESERVATION AND REPLACEMENT The CSP Development shall meet or exceed the minimum allowable post development tree coverage requirements of Jasper County . Trees required and/or worthy of preserving shall be incorporated into buffer areas around jurisdictional wetlands , in required buffer yards and in the required Highway Corridor Overlay District 50’ buffer parallel and adjacent to the U.S. 278 Highway. In those cases where the minimum allowable tree coverage cannot be met by preservation within a required buffer area, replacement trees shall be planted to meet the tree types and quantities as required by code. Trees to be preserved in buffer areas shall be identified and located by a tree survey within the CSP Development PDD. Plantings, including trees, situated in any buffer area shall be maintained in good health and any CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 7 dead or damaged plants will be replaced. And if any tree in a buffer is severely damaged due to weather or other reasons, all severely damaged trees shall be replaced no later than the end of the next dormant season. I. PARKING Parking for the CSP Development community shall be provided by a combination of attached and/or detached residential parking garages and their corresponding driveways, and community surface parking lots for overflow parking, the community amenity areas and leasing offices . All parking shall be generally consistent with Jasper County development standards or as otherwise proposed by the Applicant/Owner and approved by Jasper County. J. STORMWATER MANAGEMENT The CSP Development PDD shall conform to the Stormwater Management Provisions of the Jasper County Land Development Standards including but not necessarily limited to the Jasper County Stormwater Management Design Manual and applicable state and federal requirements. Among other things, the post-development peak runoff discharge rate for the 2-, 10- and 25-year, 24-hour design storm events will be designed to control these rates to pre-development discharge rates. Additionally, the CSP Development PDD shall design its stormwater system to manage a 100-year, 24-hour storm event without causing damage to on-site and offsite structures. Sufficient stormwater best management practices will be employed in the development of the P DD to ensure runoff leaving the site does not degrade water quality of the surrounding receiving waters. K. CULTURAL AND HISTORICAL RESOURCES As part of a comprehensive study of the property a Phase I and Phase II archeological investigations and studies were conducted by Brockington & Associates. The investigations have concluded that there are no archeological sites eligible for the National Register requiring preservation or management considerations on the property. Exhibit N Archaeological Report is attached. L. EMERGENCY SERVICES Fire and emergency medical services will be provided to the residents of the CSP Development by no less than two Jasper County Fire-Rescue stations which are located less than 5 miles from the property. FIRE STATION AND EMS LOCATIONS EXHIBIT P is attached identifying Jasper County Fire Stations 34 and 35 and their distances (each less than 5 miles) and times in route to the CSP Development. CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 8 SECTION II: LAND USE DESIGNATION AND DEFINITIONS A . INTRODUCTION and NARRATIVE The Conceptual Master Plan consists of an area of approximately 38.84 acres. The proposed predominate uses shall include but not be necessarily limited to: • For-Rent Single Family Residential situated on an unsubdivided parcel(s) and/or on subdivided individual platted lots • Single Family For Sale Residential situated on subdivided individual platted lots • Active and passive community amenity areas • Model homes and leasing and sales centers • Site infrastructure The land use areas indicated on the Conceptual Master Plan are not intended to be rigid exact boundaries for future improvements. The Conceptual Master Plan PDD for the CSP Development shall maintain flexibility to accommodate specific soils conditions, environmental concerns, physical constraints, market conditions and design parameters and as such, the exact location of boundary lines and any proposed buildings or structures, between land uses and their subsequent location and size indicated within the planning area shall be subject to change at the time of the Master Plan Phase and Development Permit Plan submission; provided that maximum densities and other conditions of the Development Agreement between the Applicant / Owner and Jasper County, South Carolina will be adhered to strictly, unless adjustments are requested by the Applicant / Owner and approved by Jasper County. All rental residential dwelling units shall be owned, controlled and maintained by the Applicant or its assigns or successors which units may be located on an unsubdivided parcel or individual platted lots. Amenities, on-property infrastructure and improvements not dedicated or otherwise conveyed to public or private third parties (such as a homeowner’s association) shall be owned, controlled and maintained by the Applicant / Owner or its successors. If at any time in the future rental homes that are situated on subdivided platted lots are sold and owner occupied, these housing units shall be owned, controlled, and maintained by their individual owners. B. ALLOWED LAND USES The following land uses shall be permitted in the CSP Development PDD. The purpose of this portion of the PD D document is to state which land uses shall be allowed within the CSP Development PDD and to clearly define development within the area. However, by allowing these uses this does not obligate the Applicant / Owner to provide all of the uses or facilities herein. The allowed land uses and definitions shall be as follows: For-Rent and/or For Sale Single Family Residential • Single Family Residential Dwelling - A detached or attached home used exclusively for CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 9 residential purposes which is either (i) leased to its tenant(s) located on a single parcel of unsubdivided land or on subdivided platted lots and/or (ii) detached or attached homes sold to buyers /homeowners which homes shall be located on single subdivided platted lots. Dwelling units may have either private or shared access. Units may be arranged in a variety of configurations including detached, attached, back-to-back, side to side, vertical or any combination thereof. • Home Sites - Individual un-platted parcels or individual platted lots available for short or long-term lease for the rental homes or for owner occupied homes. • Amenity Areas - including Club House / swimming pool / playground / bocce ball / cornhole / horseshoes / oyster tables / pickleball and tennis courts / amphitheater / fitness facility or other recreational amenities. • Mail kiosks including drone delivery station(s) • Utilities • Recreational Amenity Uses such as, but not limited to: o Dog park o Multi-use field(s) o Gazebo o Kayak, canoe and boat storage areas o Trails or sidewalks o Bike paths o Mini-golf and/or golf putting green o Pavilion o Grilling areas o Common open space and other active and passive recreational uses o Maintenance Areas or Buildings o Planting/vegetable garden(s) Design Standards and Regulations may be establ ished for each area and use at the time of development permit, unless agreed at development permit approval or in this PDD, the standard for uses from the Jaser County Land Development Regulations shall apply. Any easement that occurs within the property shall have the same land uses as any of the adjacent land uses. Any restrictions shall be based on the legal definition of the easement. C. ALLOWED DENSITY WITHIN PLANNING AREAS 1. Preliminary planning for the Property contemplates the Residential land uses {including wetlands) for the entire property as depicted on the Conceptual Master Plan. The Conceptual Master Plan layout may be modified at the time of development permit application. 2. The t otal project is allowed a maximum of 275 Single Family Dwelling Units. The maximum size per dwelling unit shall be 2,500 square feet. The minimum dwelling unit shall be 800 square feet. The size and configuration of anticipated dwelling units displayed on the Conceptual Master Plan may be modified at the time of development permit. The submitted Conceptual Site Plan presently indicates 265 Single Family Dwelling Units. 3. Overall residential density may include both Attached and Detached Single Family Residential dwelling units. CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 10 D. DEFINITIONS OF LAND USE TERMS AND DENSITY TERMS In the absence of a term definition in this Conceptual Master Plan or in the proposed CSP Development PDD with Jasper County, the definitions of the Jaser County Land Development Regulations shall apply in the interpretation of this Conceptual Master Plan. The definitions below shall generally describe the allowed uses and terms within the CSP Development PDD. 1. Acre a. Gross Acre shall mean the entire acreage within the site boundaries. b. Net Acre shall mean the acre which remains after deduction of easements for existing utilities, wetland buffers, and onsite wetlands. 2. Maintenance Areas The maintenance areas w ill contain the facilities , tools, and equi pment necessary to maintain the common properties and amenit ies within the CSP Development PDD. These facilities may be congregated on a central site or located in separate convenient sites for different services such as general community mai ntenance, recreation area maintenance or individual property regime maintenance. Permitted uses include: a. Storage of vehicles and parts , boats, recreational vehicles . tools, supplies, and resident storage. b. Offices associated with community and maintenance. 3. Open Space Total open space for the Property shall be calculated for the boundary of the Property and not on a s ite-specific basis for each par cel or phase of the Property , individual development. or project. The Property shall provide at least 10% open space. Open space shall be calculated based upon the total gross acreage. Open space shall consist of the following: a. Landscape s urface areas (areas not covered by buildings , parking. impervious surface) including manicured village greens or equivalent b. Lagoons, ponds, impoundments, and lakes (detention, retention, or recreational) c. Freshwater wetlands d. Wetland buffers e. Forest, wildlife preserves / corridors, conservation areas and greenbelts f. Community Park, amenity areas and community garden plots g. Recreation areas includi ng swimming pools, tennis courts, playgrounds , multi-purpose fields, lawn games, gardens, etc. h. Pedestrian / bicycle trails /paths /nature trails i. Perimeter buffers 4. Setbacks, Lot Sizes and Buffers CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 11 a. There shall be no minimum setbacks applied to the CSP Development PDD unless noted otherwise in this PDD document. Setbacks and buffers sha ll meet the minimum requirements established herein, and except as set forth in this P DD Standards, s hall apply to the pe rimeter of the P DD on ly provided, however, that any requi red wetlands buffers shall apply according to law throughout the Property. b. Setbacks /buffer areas shall be provided for jurisdictional wetlands within the PDD. Setbacks / buffers for wetlands shall be 25 feet . c. Perimeter buffer standards shall include: (i) At adjacent property boundaries to the east and to the north of the PDD ( adjacent properties to east and north are jurisdictional wetlands) buffers shall be 20 feet at a m inimum. See P DD Conceptual Master Plan for proposed perimeter buffers. A 50-foot buffer shall be provided along the property’s boundary with the GC zoned property to its west. Underground utilities and stormwater management facilities are allowed in the perimeter buffer area. (ii) At all buffers of the PDD, disturbances related to grading activities are allowed prov ided that the following preservati on practices are met: (A) Within 50- foot U.S. 278 highway buffer a minimum of 7 broadleaf overstory trees, 8 understory trees, and 35 shrubs shall be preserved or re-planted per 100 linear feet of U.S 278 frontage. (iii) Highway 278 Corridor Overlay District (HCOD) standards shall be adhered to provided that signage shall be governed by the provisions established by the future Master Plan. CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 12 d. Lot Areas and Setbacks (i) Single Family For Rent Homes and Single Family For Sale homes will have setback and yard requirements as set forth in the below TABLE 1: CSP PDD DEVELOPMENT TABLE 1 MEASUREMENTS FOR UNSUBDIVIDED AND SUBDIVIDED RESIDENTIAL Single Family Schedule of Lot Area, Yard, and Setbacks Minimum Lot Per Unit SF Patio4 Duplex5 Townhome6 Non- Resi7 Unsubdivided Residential (For Rent Only)1 NA NA NA NA NA Subdivided Residential (For Sale and/or For Rent) 1700 NA NA 1000 NA Minimum Yard and Building Setback (feet) Single Family & Non-Residential Uses SF Patio4 Duplex5 Townhome6 Non- Resi7 Unsubdivided Residential Min lot width 2 NA NA NA NA NA Subdivided Residential Min lot width 30 NA NA 18 NA Front Yard (Measured from Edge of Road R/W) Major Street (Multi-Lane) NA NA NA NA Major Street (Multi-Lane) NA NA NA NA Minor Street 10 NA NA 10 NA Side Yard3 Residential 5 NA NA 5 Non-Residential NA Rear Yard3 Residential 10 NA NA 5 Non-Residential N/A Notes: 1. "For Rent" homes can be situated on an unsubdivided single parcel and not on individual subdivided lots. Therefore, there are no legal fee simple lots with defined lot areas. 2. Because the "For Rent" homes can be situated on a unsubdivided single parcel CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 13 and not on individual subdivided fee simple lots, there are no defined lot dimensions. 3. For unsubdivided rental residential units, yard dimensions provided are minimum side yard and back yard depths. In all cases, there shall be 10' minimum clear between structures. 4. Patio homes are not an included product. 5. Duplexes are not an included product. 6. Townhomes are two or more attached units with 5' side yards at each end unit with 10' clear between adjacent structures. 7. Non-Resi is a non-residential/commercial use exclusive of community amenity improvements and leasing and sales offices. Non-Resi uses are not an included product. 8. Setbacks are measured to the front, side or rear face of the principal structure and excludes measurements to such things as HVAC equipment, stoops, ground level or upper-level decks, or similar ancillary structures. 9. Minimum easement width for storm drain pipe of 15” to 24” in size shall not be less than 10 feet. 5. Wetlands This designation allows the following uses within wetlands. Freshwater wetlands on the property shall be those areas over which the applicable governmental agencies claim jurisdiction for freshwater wetlands. Unless restricted via a future Memorandum of Understanding (MPA) to the contrary, the following are permitted uses: a. Open space and buffers b. Conservation areas c. Activities in all wetland areas as permitted by the U.S. Army Corps of Engineers and/or the South Carolina Department of Health and Environmental Control, Office of Ocean and Coastal Resource Management as applicable d. Disposal of reclaimed water as permitted by SCDHEC. e. Boardwalks, trails, bridges, and other permitted structures. f. Game Management 6. Utilities This designation allows for utility service to serve the planning areas of the CSP Development PDD. The following land uses shall be allowed only after written approval from the Applicant I Owner and its consul tants for location and design. Screening, buffering, and other aesthetic matters must meet or exceed the Jaser County Land Development Regulations and may be approved at the time of site devel opment application. a. Potable water supply and distribution b. Wastewater collection, treatment, and disposal c. Stormwater collection, treatment and detention d. Irrigation e. Communication towers CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 14 f. Satellite antennas g. Cable television facilities h. Telephone facilities i. Power transmission and distribution j. Fiber optic lines k. Other utility services i.e., Internet access and other tel ecommunication uses Certain comm unity-wide infrastructure is required for the devel opment of any large, master-planned community. T his infrastructure may inc lude, but is not limited to the following: 1. Arterial streets and primary access roads 2. Water supply 3. Wastewater Treatment and Effluent Disposal 4. Power substations 5. Central telephone facilities/ Cell phone towers 6. Stormwater Management Lagoons 7. Natural Gas Supply 8. Sewer Pump Station Infrastructure serving the community (on-site and off-site) will be approved as part of the development plan approval process. 7. Design Standards Design Standards shall be submitted at the Master Plan stage and may have standards deviating from the Jasper County Ordinances or this PDD, provided that health, safety, ingress/egress, and fire protection are addressed to the satisfaction of the County. EXHIBIT B CONCEPTUAL MASTER PLAN Single Family Residential Community 1 STATE OF SO UTH CAROLINA ) DEVELOPMENT AGREEMENT ) COUNTY OF JASPER ) CSP DEVELOPMENT TRACT This Development Agreement ("Agreement") is made and entered this day of , 2022 (the “ Effective Date”), by and between Conduit Street Partners, LLC (a Maryland Limited Liability Company) ("Owner") and the governmental authority of the Jasper County, South Carolina ("County"). WHEREAS, th e legislature of the State of South Carolina has enacted the "South Carolina Local Government Development Agreement Act (the "Act") as set forth in Sections 6- 31-10 through 6-31-160 of the South Carolina Code of Laws (1976), as amended; and, WHEREAS , the Act recognizes that the lack of certainty in the approval of development can result in a waste of economic and land resources, can discourage sound capital improvement planning and financing, can cause the cost of housing and development to escalate, and can discourage commitment to comprehensive planning." [Section 6-31-10 (B)(1)]; and, WHEREAS, t he Act also states: "Development agreements will encourage the vesting of property rights by protecting such rights from the effect of subsequently enacted local legislation or from the effects of changing policies and procedures of local government agencies which may conflict with any term or provision of the Development Agreement or in any way hinder, restrict, or prevent the development of the project. Development Agreements will provide a reasonable certainty as to the lawful requirements that must be met in protecting vested property rights, while maintaining the authority and duty of government to enforce laws and regulations which promote the public safety, health, and general welfare of the citizens of our State." [Section 6-31-10 (B)(6)]; and, EXHIBIT B-1 2 WHEREAS, the Act further authorizes local governments, including County governments, to enter Development Agreements with owners to accomplish these and other goals as set forth in Section 6-31-10 of the Act; and, WHEREAS, Owner is the contract purchaser of approximately 38.84 acres, generally to be known as CSP Development, and being more particularly described in Exhibit A and proposes to develop, or cause to be developed, therein Residential uses, to include the potential of any alternative allowed uses, including accessory and complimentary uses as described in the Planned Development District Standards adopted contemporaneously herewith by separate County Ordinance No. O-2022-16; and, WHEREAS, the County seeks to protect and preserve the natural environment and to secure for its citizens quality, well planned and designed development and a stable and viable tax base; and, WHEREAS, the County finds that the program of development proposed by Owner for this Property is consistent with the County’s comprehensive land use plan; and will further the health, safety, welfare and economic well-being of the County and its residents; and, WHEREAS, the program for development of the Property presents an opportunity for the County to secure quality planning and growth to protect the environment and strengthen and revitalized the tax base; and, WHER EAS, this Development Agreement is being made and entered between Owner and the County, under the terms of the Act, for the purpose of providing assurances to Owner that it may proceed with its development plan under the terms hereof, as hereinafter defined, consistent with Jasper County Zoning Ordinance and the Planned Development District Standards for the CSP Development (as herein defined) without encountering future changes in law which would affect the ability to develop under the Jasper County Zoning Ordinance and the Planned Development District Standards for the CSP Development Tract, and for the purpose of providing important protection to the natural environment and long term financial stability and a viable tax base to the County, and for the purpose of providing certain funding and funding sources to assist the County in meeting the service and infrastructure needs associated with the 3 development authorized hereunder; NOW THEREFORE, in consideration of the terms and conditions set forth herein, and other good and valuable consideration, including the potential economic benefits to both the County and Owner by entering into this Agreement, and to encourage well planned development by Owner, the receipt and sufficiency of such consideration being hereby acknowledged, the County and Owner hereby agree as follows: I. INCORPORATION. The above recitals are hereby incorporated into this Agreement, together with the South Carolina General Assembly findings as set forth in Section 6-31-10(B) of the Act. II. DEFINITIONS. As used herein, the following terms mean: "Act" means the South Carolina Local Government Development Agreement Act, as codified in Sections 6-31-10 through 6-31-160 of the Code of Laws of South Carolina (1976), as amended; incorporated herein by reference. “Adjustment Factor” shall mean the greater of three percent 3% per annum or the annual inflation factor supplied to local governments by the SC Department of Revenue and Fiscal Affairs for use by local governments in determining allowable millage increases, such adjustment to be applied on July 1 st of each year with the first adjustment being applied July 1, 2023. “Agreement” shall mean this Development Agreement as amended by the County and Developer in writing from time to time. “Association” shall mean one (1) or more property owners’ associations established to maintain portions of the Property, if such is ever formulated, which is not expected for that portion(s) of the Property that is developed as rental units which are under single ownership, as contemplated under the PDD. 4 “BJWSA” shall mean the Beaufort/Jasper Water and Sewer Authority, its successors or assigns. “Civic Fund” shall mean the segregated interest bearing Escrow Account into which all Development Fees for Police, EMS and Fire are contributed pursuant to Section XI herein. “Conceptual Master Plan” shall mean the Conceptual Master Plan adopted as part of the Planned Development District Standards (“CSP PDD Standards”) by the County,. “CSP PDD” means the Planned Development District for the CSP Development approved by the County by Ordinance Number 0-2022-16, concurrently with its approval of this Agreement “CSP PDD Standards” means the development standards applicable to the CSP PDD, including the Conceptual Master Plan, as adopted by the County in connection with its approval of the CSP PDD, attached hereto or incorporated by reference as Exhibit B. “Current Legal Owner” means Paul H. Anderson, Emily A Tillman, and John F. Anderson, who have contracted with Conduit Street Partners, LLC to sell the Property. “County” shall mean Jasper County, South Carolina. “DHEC” shall mean the South Carolina Department of Health and Environmental Control “Developer” means the Owner, along with any and all successors in title, assigns or lessees of the Owner who are transferred in writing from the Owner all or a portion of the Development Rights under this Agreement and undertake Development of any portion of the Property, as applicable in the context where such term is used. "Development" means the development of portions of the Property as contemplated in the Zoning Regulations. “Development Fees” or “Developer Fees” shall have the meaning set forth in Paragraph XI. "Development Rights" means Development undertaken by the Owner or Developers in accordance with the Zoning Regulations and this Development Agreement 5 “OCRM” means the South Carolina Office of Ocean and Coastal Resource Management "Owner" means Conduit Street Partners, LLC, a Maryland limited liability company, its corporate successors and any assignee, whereby such interest is assigned in writing to it by Owner. Owner has a present equitable interest in the Property by virtue of a contract to purchase with Current Legal Owner. “Park Fund” shall mean the segregated interest bearing Escrow Account into which all Development Fees for Parks are contributed pursuant to Section XI herein. “CSP Development”, “CSP Tract” or “Property” means that certain tract of land described on Exhibit A, as may be amended with the Agreement of the County and Owner. “Project” means the Development that will occur within and upon the CSP Tract. “Roadway Fund” shall mean the segregated interest bearing account into which all Development Fees for Roads are contributed until utilized for public roadway improvements pursuant to Section XI herein. "Term" means the duration of this agreement as set forth in Section III hereof. “Zoning Ordinance” means the Jasper County Zoning Ordinance adopted November 13, 2007, as amended through the Effective Date hereof, and attached hereto as Exhibit C and incorporated herein by reference. "Zoning Regulations" means the CSP PDD establishing a Planned Development District for the Property, and all the attachments thereto, including but not being limited to the PDD Conceptual Master Plan, all narratives, applications, and site development standards thereof (a copy of all of which is attached hereto marked Exhibit B and/or incorporated herein by reference), all as same may be hereafter amended by mutual agreement of the County and the Owner, this Development Agreement, and the Jasper County Development Ordinance(s) being codified with Municode© and current on Municode© through Supplement No. 3 as of June 21, 2021 as amended through the Effective Date of this Agreement, except as the provisions thereof may be 6 clarified or modified by the terms of the CSP PDD and this Agreement, and all other applicable statutes, ordinances and regulations governing uses and development of the Property. III. TERM. The term of this Agreement commenced on the date this Agreement was executed by the County and Owner and terminates Five (5) years thereafter (“Termination Date”). This is the maximum initial term permitted by law for the Property. Nothing in this Agreement shall be interpreted to preclude the Parties from extending the Termination Date by mutual agreement or from entering into subsequent development agreements. IV. DEVELOPMENT OF THE PROPERTY. The Property shall be developed in accordance with the Zoning Regulations and this Agreement. All costs charged by or to the County for reviews required by the Jasper County Zoning and Development Ordinance(s) shall be paid by the Owner or Developer or other party applying for such review as generally charged throughout the County for plan review. The County shall, throughout the Term, maintain or cause to be maintained, a procedure for the processing of reviews as contemplated by the Zoning Regulations and this Agreement. V. CHANGES TO ZONING REGULATIONS. The Zoning Regulations relating to the Property subject to this Agreement shall not be amended or modified during the Term, without the express written consent of the Owner except in accordance with the procedures and provisions of Section 6- 31-80(B) of the Act, which Owner shall have the right to challenge. Owner does, for itself and its successors and assigns, including Developers and notwithstanding the Zoning Regulations, agrees to be bound by the following: 1. The Owner shall be required to notify the County, in writing, as and when Development Rights are transferred to any other party. Such information shall include the identity and address of the acquiring party, a proper contact person, the location and number of acres of the Property transferred, and the number of residential units and/or commercial acreage and square footage of structure, as applicable, subject to the transfer. Developers 7 transferring Development Rights to any other party shall be subject to this requirement of notification, and any entity acquiring Development Rights hereunder shall be required to file with the County an acknowledgment of this Agreement and a commitment to be bound by it. 2. The Owners and Developers, and their respective heirs, successors and assigns agree that all Development, with the exception of irrigation, incidental maintenance facilities, and similar amenities which exist from time to time, and facilities existing at the date of this Agreement will be served by potable water and public sewer prior to occupancy, except as otherwise provided herein for temporary use, temporary being defined as one year or less. Septic tanks and/or wells may be allowed with the permission of BJWSA where there is a specific finding that such use for specific portions of the Property will comply with the overall environmental standards. VI. DEVELOPMENT SCHEDULE. The Property shall be developed in accordance with the development schedule, attached as Exhibit D, or as may be amended by Owner or Developer(s) in the future to reflect actual market absorption. Pursuant to the Act, the failure of the Owner and any Developer to meet the initial development schedule shall not, in and of itself, constitute a material breach of this Agreement. In such event, the failure to meet the development schedule shall be judged by the totality of circumstances, including but not limited to the Owners and Developer(s) good faith efforts to attain compliance with the development schedule. These schedules are planning and forecasting tools only and shall not be interpreted as mandating the development pace initially forecast or preventing a faster pace if market conditions support a faster pace. The fact that actual development may take place at a different pace, based on future market forces, is expected and shall not be considered a default hereunder. Development activity may occur faster or slower than the forecast schedule, as a matter of right, depending upon market conditions. Furthermore, periodic adjustments to the development schedule which may be submitted unilaterally by Owner / Developers in the future, shall not be considered a material amendment or breach of the Agreement. VII. DENSITY. The criteria as set forth in Section II of the CSP PDD Standards shall apply with respect to lot size, frontage, setbacks, impervious surface and height requirements, respectively, within the 8 Project. Residential density and types on the Property shall be the densities and types as set forth in the CSP Planned Unit Development approval, Conceptual Master Plan, and as set forth below: 1. Up to a maximum of 275 residential dwelling units may be constructed. The CSP PDD and the CSP Conceptual Master Plan depict the expected mix and general location of allowed residential units, however, so long as the total residential unit count does not exceed 275 units and the general concept of development as shown on the Conceptual Master Plan is followed, the Owner shall be allowed to alter location and product mix among all allowed uses under the PDD at the time of Master Plan submittal when more specific design are available, based upon ongoing project planning and market conditions. 2. Any such changes to exact location or product mix shall not be considered a material amendment hereto, or an amendment to the attached PDD or the Conceptual Master Plan, so long as the total allowed density is not exceeded and the use remains residential. Such minor changes will be approved at the staff review level. VIII. RESTRICTED ACCESS The Owner and/or each Developer shall have the right (but not the obligation) to create restricted access communities within the Property as long as such limited access does not adversely affect in any material respect adjacent traffic patterns located on public rights-of- way. IX. EFFECT OF FUTURE LAWS. Owner and Developers shall have vested rights to undertake Development of any or all of the Property in accordance with the Zoning Regulations, as defined herein and modified hereby, and as may be modified in the future pursuant to the terms of this Agreement for the entirety of the Term. Future enactments of, or changes or amendments to the County ordinances, including zoning or development standards ordinances, which conflict with the Zoning Regulations shall not apply to the Property unless the procedures and provisions of §6-31-80 (B) of the Act are followed, which Owner shall have the right to challenge. Notwithstanding the above, the Property will be subject to then current fire safety standards and state and/or federal environmental guidelines standards of general application. 9 The parties specifically acknowledge that this Agreement shall not prohibit the application of any present or future building, housing, electrical, plumbing, gas or other standard codes, or any ad valorem tax of general application throughout the County, found by the County Council to be necessary to protect the health, safety and welfare of the citizens of the County. X. INFRASTRUCTURE AND SERVICES The County and Owner recognize that the majority of the direct costs associated with the Development of the Property will be borne by the Owner and Developers, and many other necessary services will be provided by other governmental or quasi-governmental entities, and not by the County. For clarification, the parties make specific note of and acknowledge the following: A. Private Roads. All roads within the Property shall be constructed by the Owner, Developer or other parties and maintained by such party(ies) and/or Association(s) or dedicated for maintenance to other appropriate entities. The County will not be responsible for the construction or maintenance of any private roads within the Property. The CSP Development project shall have private roads designed to the standards reasonably acceptable to the County Engineer. Road construction within SCDOT right of ways will be in accordance with SCDOT standards. Roadway section details shall be submitted for review at the time of development permit applications, as provided in the PDD. B. Public Roads. All public roads outside the Property that serve the Property are under the jurisdiction of the State of South Carolina or other governmental entities regarding access, construction, improvements and maintenance. Owner acknowledges that it must comply with all applicable state statues and rules and regulations of the South Carolina Department of Transportation (“SCDOT”) or its successor regarding access and use of such public roads. Future public roads may serve the Property. The County shall not be responsible for construction, improvements or maintenance of the public roads which now or hereafter serve the Property, unless it otherwise agrees in the future. Owner has engaged Bihl Engineering, LLC, of Charleston, SC, to prepare a traffic impact analysis which has been submitted to the SCDOT for review and comment. Subject to the approval of SDOT and any other the applicable jurisdictional authorities, the Property is proposed to be served by direct access to the existing Brickyard Road and U.S. 10 Highway 278. Developer shall be responsible for construction of property access improvements as recommended by SCDOT after review of the SCDOT required traffic study. Upon completion of construction of any such improvements within the SCDOT right of way, and acceptance by SCDOT, the SCDOT shall then maintain all roadway improvements within the public road right of way. C. Potable Water. Potable water will be supplied to the Property by BJWSA or some other legally constituted public or private provider allowed to operate in the County. The County shall not be responsible for any construction, treatment, maintenance or costs associated with water service to the Property unless the County elects to provide such services with the agreement of the applicable utility authority then providing such service to the Property. Owner will construct or cause to be constructed all related infrastructure improvements within the Property, which will be maintained by it or the service provider as provided in any utility agreement between Owner and the service provider. D. Sewage Treatment and Disposal. Sewage treatment and disposal will be provided by BJWSA or some other legally constituted public or private provider allowed to operate in the County. The County will not be responsible for any treatment, maintenance or costs associated with sewage treatment within the Property, unless the County elects to provide such service with the agreement of the applicable utility authority then providing such service to the Property. Nothing herein shall be construed as precluding the County from providing sewer services to its residents in accordance with applicable provisions of law. Owner will construct or cause to be constructed all related infrastructure improvements within the Property, which will be maintained by it or the provider as provided in any utility agreement between Owner and the service provider. E. Use of Effl uent. Owner agrees that treated effluent will be disposed of only in such manner as may be approved by DHEC and the BJWSA. F. Police Services. County shall provide police protection services to the Property on the same basis as is provided to other similarly situated residents and businesses in the County. Owner acknowledges the jurisdiction the Sheriff of Jasper County on the Property and shall not interfere or in any way hinder public safety activities on the Property regardless of whether such may be a restricted access community. Should Owner desire an increased level of service above the normal County level of police service, Owner shall be responsible for either 11 providing such services through the use of private security forces or shall pay the County’s direct and indirect costs for providing such increased level of service. G. Fire Services. County shall provide fire protection services to the Property on the same basis as is provided to other similarly situated residents and businesses in the County. Owner acknowledges the jurisdiction of the County’s fire department on the Property and shall not interfere or in any way hinder public safety activities on the Property regardless of whether such may be a restricted access community. H. Sanitation Services. County will not provide sanitation services to any properties with the Property. Should Owner desire such services, the Owner shall provide these directly to the Property by a private licensed private contractor. I. Recreation Services. County shall provide recreation services to the Property on the same basis as it provides to other similarly situated residents and businesses in the County. J. Library Services. Such services shall be provided to residents on the same basis as to all other citizens of the County. K. Emergency Medical Services (EMS). Such services shall be provided to residents of the Property on the same basis as to all other citizens of the County. L. Drainage System. All stormwater runoff, treatment and drainage system improvements within the Property will be designed in accordance with the Zoning Regulations and Best Management Practices then current. All stormwater runoff, treatment and drainage system improvements for the Property shall be constructed by Owner or the Association, as applicable. The County will not be responsible for any construction or maintenance cost associated with the stormwater runoff, treatment and drainage system within the Property. M. Stor m Water Quality. Protection of the quality in nearby waters and wetlands is a primary goal of the County. The Owners shall be required to abide by all provisions of federal, state and local laws and regulations, including those established by the Department of Health and Environmental Control, the Office of Ocean and Coastal Resource Management, and their successors for the handling of storm water. In addition to the water quality safeguards as committed to by Owner above, notwithstanding Section IX hereof, Owner 12 and any developer shall adhere to any and all future ordinances or regulations of the County (or portions thereof) governing detention, filtration, and treatment of storm water provided those ordinances and regulations apply county wide, and are consistent with sound engineering practices. Further provisions regarding Storm Water are included within the PDD for this Project. XI. DEVELOPMENT FEES 1. To assist the County in meeting expenses resulting from ongoing development, Owner shall pay development fees for Road, Civic and Parks (“Development Fees”) as follows: 2. DEVELOPMENT FEES AMOUNT Residential Dwelling Units TOTAL FEE PER RESIDENTIAL DWELLING UNIT $1,745 Net Roads Fee. See Section 3. below. $1,572.000 – Civic (Police, EMS and Fire) $1,683.00 – Park $5,000.00 3. Net Roads Fee. The Net Roads Fee is calculated as the proposed Jasper County gross Road Fee of $5,000 per unit, less an estimated per unit “public road improvement credit” in the amount of $3,755. The “road improvement credit” represents a $1,000,000 estimate of costs of all external, off -site road improvements that will be borne by Owner at its sole cost and expense in connection with the development of the project, including but not necessarily limited to the construction of Highway 278 and Brickyard Road external roadway improvements, divided by the estimated number of residential units that will be constructed within the CSP PDD (265 units). The Net Road Fee is not intended to compensate the County for the construction of any private road improvements within the CSP PDD, since all private roads within the CSP PDD are to be constructed and maintained by Owner at Owner’s sole cost and expense. Accordingly, no Development Fees for on-site, internal roads shall be collected. 13 4. All Development Fees for building permits issued to Owner shall be collected at the time of issuance of an occupancy permit instead of at issuance of the building permit. All Development Fees shall be placed in separate interest bearing accounts established for Roads, Civic and Parks. The County may expend these funds for any purposes designed to provide or enhance such services. 5. Notwithstanding any provisions to the contrary contained within this Agreement, it is acknowledged Jasper County is in the process of considering the adoption of Impact Fees as allowed by §6 -1-910, et. seq. of the South Carolina Code of Laws (1976, as amended). The Property shall be exempt from any requirement to pay County Impact Fees under any ordinance subsequently passed and enacted by the County, for the first five (5) years of the Term of this Agreement as it may be extended by mutual agreement between the Owner and County. In the event Impact Fees are adopted by the County, the Property shall be subject to such fees provided they are applied uniformly to similar properties as this Property, and provided further, that any Developer Fees paid by the Developer under Article XI (1), (2) and (3) shall be credited against the Impact Fees to the extent the Development F ees are for items included in the capital program incorporated in the formulation of the Impact Fees, or for the traffic improvements on Highway 278 and Brickyard Road as recommended by the SCDOT as itemized above.. It is further provided Owner and/or Developers shall be subject to the payment of any and all present or future permitting fees enacted by the County that are of County wide application and that relate to processing applications, development permits, building permits, review of plans, or inspection (no other capital improvement related impact, development or other extractions) 6. Except as set forth in this Agreement, nothing herein shall be construed as relieving the Owner, its successors and assigns, from payment of any such fees or charges as may be assessed by entities other than the County, provided however, if an entity other than the County is permitted by the County to impose fees or obligations similar in nature to those contemplated by this Agreement, the Owner shall be entitled to either an offset against the Development Fees of this Agreement the in the entire amount of such fees or obligations which are collected or an entire credit against the other fees allowed to be collected. It is the intent of the parties that the fees and obligations contemplated by this Agreement are the only obligations which will be imposed upon the Property and that County shall not permit any other governmental authority to impose fees or obligations of a similar nature to that which are contemplated by this Agreement without providing 14 for a credit against the other fees for the fees due under this Agreement; provided, however, the provisions of this paragraph shall not preclude the County or another governmental authority from imposing a fee of a nature which is for services or improve ments other than those contemplated under this Agreement - (i.e., roads, fire/public safety), which are imposed on a consistent basis throughout the area regulated by such governmental authority imposing such obligations. The County or other governing body shall not be precluded by this Agreement from charging fees for delivery of services to citizens or residents (i.e., an EMS response fee or the like), nor from charging fees statutorily authorized in the future (i.e, a real estate transfer fee or the like) which are not collected as a prerequisite to approval of a plat, plan or construction. 7. The fees set forth above in Article XI are vested for the entire Property during the Term of this Agreement and shall not be increased. No other Development Fee shall be imposed in connection with the Property, except as may be allowed pursuant to Article X and fees set out in generally applicable ordinances such as building permitting fees and inspection fees. The Civic, Park and Road Development Fees are subject to an annual inflation factor equal to inflation factor as provided by the State of South Carolina to each local government for the calculation of tax millage increases. 8. Any Development Fees paid and/or credits for Development Fees with respect to property conveyed, services performed and/or money paid as provided in this Agreement may be assigned by the Owner and/or Developer owning such credits and all such credits, shall remain valid until utilized. The County shall recognize all such written assignments of such rights and shall credit same against any Development Fees which are owned pursuant to this Agreement. 9. Development Fees for on- site, internal roads shall not be collected. All internal roads shall be constructed and maintained by Owner at Owner’s sole cost and expense. 10. All Net Road Fees shall be utilized in the discretion of the County, for traffic and highway improvements as contained in the capital improvement program to be funded by the proposed County impact fees, or other traffic and highway improvements to Highway 278 or Argent Boulevard. 11. Owner agrees to pay the reasonable costs and expenses of the County’s consultants and professionals incurred in negotiating, processing and evaluating this Agreement and the accompanying PDD. County will provide sufficient documentation of these charges. Owner 15 shall pay such fees within 60 days of the delivery of the invoice(s). XII. PERMITTING PROCEDURES: 1. The County agrees to allow the Developer the ability to permit and construct model homes without utilities (i.e., “dry models”) and to relocate the models as necessary within the CSP Tract. 2. The County agrees that the Owner and/or any Developer is not required to phase development but shall have the right to do so. 3. The County agrees to review all land use changes, land development applications, and plats in an expeditious manner in accordance with County regulations as modified by the CSP PDD Standards for this Project. Plans will be processed in accordance with the then current County PDD Plan and development plan procedural requirements. Developer may submit these items for concurrent review with the County and other governmental authorities. County may give final approval to any submission but will not grant authorization to record plats or begin development construction activities until all permitting agencies have completed their reviews. 4. Signage for the Project is governed by the provisions of the PDD for this Project. 5. The County acknowledges that the Developer has the initial right of architectural review regarding improvements and building upon the property subject to normal review by the County Planning Commission. Developer shall be responsible for assuring such modifications are in compliance the Zoning Regulations. 6. The Count y agrees to allow plat recording with a financial security instrument acceptable to the County prior to completion of infrastructure development and to issue building permits prior to completion of such bonded infrastructure in accordance with the Zoning Regulations as modified by the PDD Standards for this Property. However, rental or sale and occupancy of completed residential dwellings shall not be allowed until infrastructure for a particular phase of the Project is completed and public utilities are accepted for service by the appropriate agency. 7. The County agrees the Property shall be governed by County Zoning 16 Regulations as in effect at the time of execution of this Agreement. If future codes are more desirable to Property, then Developer may request the County to have such regulations become applicable to any portion of the Project that Owner designates. 8. The County agrees that the Property is approved and fully vested for intensity, density, development fees, uses and height, and shall not have any obligations for on or off-site transportation or other facilities or improvements other than as provided in this Agreement, but must adhere to the then current requirements of the CSP PDD Standards, including, but not limited to the Conceptual Master Plan, and subdivision plat and development plan procedural guidelines. The County may not impose additional development obligations or regulations in connection with the ownership or development of the Property, except in accordance with the procedures and provisions of § 6-31-80 (B) of the Act, which the Owner shall have the right to challenge. 9. Roadways (public or private) may utilize swale drainage systems and are not required to have raised curb and gutter systems, provided that pedestrian and non-vehicular pathways or sidewalks are provided in residential areas and to provide interconnectivity between interior subdivisions, commercial or institutional areas and public gathering areas. Public Road Improvements are subject to the drainage requirements of the public agency having jurisdiction and/or ownership . Roadway cross sections utilizing swale drainage will be designed, constructed and maintained to meet BMP standards (imposed by regulatory agencies) for stormwater quality. Roadway cross sections will be reviewed at time of proposed construction of such Roadway based upon engineering and planning standards consistent with the CSP PDD Standards prepared by Developer, subject to the approval of the County Planning Administrator. 10. All plan review fees shall be consistent with the fees charged generally in the County. XIII. DEVELOPER ENTITLEMENTS County acknowledges that Developer is vested with the following items: 1. The County will, to the extent available, promote public transportation which exists within the County to service the Property. 2. Intentionally Deleted 3. All drainage systems constructed within the CSP Development shall be 17 owned and maintained by the Owner, its assigns, or one (1) or more Association(s) which may be established for various portions of the Property and the County shall have no responsibility for the construction, operation or maintenance of such systems. Such systems shall be constructed in compliance with any applicable federal, state or local requirements, utilizing the then current Best Management Practices requirements. 4. On-site burning will be permitted within the Property upon obtaining any applicable federal state or local permits. 5. The County agrees to cooperate with the Owner and each Developer with county, state and federal roadway permitting in connection with the Development of portions of the Property. 6. County services, including, but not limited to, police, fire, sanitation, recreational parks and other governmental services shall be supplied to the Property in the same manner and to the same extent as provided to other properties within the County, subject to the limitations (if any) of Section X above. Subject to the limitations of Section X above (if any), should the Owner require enhanced services beyond that which is routinely provided within the County, then the County agrees that upon the written request of Owner, it shall negotiate in good faith with the Owner to provide such enhanced services to the Property. Any enhanced services shall be at the sole cost, if any, of the Owner. XIV. COMPLIANCE REVIEWS. As long as Owner owns any of the Property, Owner or its designee, shall meet with the County, or its designee, at least once, per year, during the Term to review Development completed by Owner in the prior year and the Development anticipated to be commenced or completed by Owner in the ensuing year. The Owner, or its designee, shall provide such information as may reasonably be requested, to include but not be limited to, acreage of the Property sold in the prior year, acreage of the Property under contract, the number of certificates of occupancy issued in the prior year, and the number anticipated to be issued in the ensuing year, and Development Rights transferred in the prior year, and anticipated to be transferred in the ensuing year. The Owner, or its designee, shall be required to compile this information within a reasonable time after written request by the County. 18 XV. DEFAULTS. The failure of the Owner, Developer or the County to comply with the terms of this Agreement not cured within thirty (30) days after written notice from the non-defaulting party to the defaulting party (as such time period may be extended with regard to non-monetary breaches for a reasonable period of time based on the circumstances, provided such defaulting party commences to cure such breach within such period and is proceeding diligently and expeditiously to complete such cure) shall constitute a default, entitling the non-defaulting party to pursue such remedies that are deemed appropriate, including specific performance; provided however no termination of this Agreement may be declared by the County absent its according the Owner and any relevant Developer the notice, hearing and opportunity to cure in accordance with the Act; and provided any such termination shall be limited to the portion of the Property in default, and provided further that nothing herein shall be deemed or construed to preclude the County or its designee from issuing stop work orders or voiding permits issued for Development when such Development contravenes the provisions of the Zoning Regulations or this Agreement. Each Party recognizes that the other Party may suffer irreparable harm from a material breach of this Agreement and that no adequate remedy at law may exist to enforce this Agreement. Consequently, the Parties agree that any non-breaching Party who seeks enforcement of the Agreement is entitled to seek the equitable remedies of injunction and specific performance. However, if there is a dispute between the County and Owner, or its successor or assign, concerning the terms, meaning, interpretation, rights or obligations under this Agreement (including any determination of material breach under the Act), the Parties agree to submit such dispute to prompt mediation before invoking legal proceedings. This pre- litigation mediation, conducted pursuant to South Carolina Rules for Alternative Dispute Resolution with subsequent judicial action lying in the Court of Common Pleas for Jasper County, South Carolina, shall be initiated by one Party notifying the other Party or Parties in writing of the dispute together with a request for mediation as described herein. The Parties agree that disputes under this Agreement not involving the Jasper County, South Carolina Zoning Regulations are contractual matters, not appealable to the Zoning Board of Appeals or the Planning Commission, but to the Court of Common Pleas for Jasper County; however, matters involving the application of the Jasper County, South Carolina Zoning Regulations are not contractual between the County and the Owner, but are subject to the administrative review and appellate provisions involving the Zoning Board of Appeals or the Planning Commission. 19 A default of the Owner shall not constitute a default by Developers, and default by Developers shall not constitute a default by the Owner. Notwithstanding the foregoing, the failure of the Owner to reasonably pursue the required permitting/approvals for and completion of required traffic mitigation measures shall be grounds for the cessation of the issuance of development permits for future sites; provided, however, that should the County Administrator determine that there is a default by the Owner, he shall immediately notify the Owner in writing by certified mail, return receipt requested, and allow the Owner fifteen (15) days to respond with an explanation of why Owner is not in default or a plan for remedying the default. In the event the Owner presents a plan of remediation for approval by the County Administrator, whose approval shall not be unreasonably withheld, the parties shall agree to a commercially reasonable time to complete the remediation plan, and during such time no negative action shall be taken against the Owner or Developers. Failure to submit such a response or failure to subsequently pursue a plan of remediation l may result in a moratorium on future development permits, a stop work order, and any other consequences reasonably determined by the County Administrator. The parties acknowledge that owners of completed buildings within the Project shall not be obligated for the obligations of the Owner or Developer set forth in this Agreement, unless the Property remains under unified ownership or unless such owners of completed buildings have been assigned any rights under this Agreement. In such case, the owners of completed buildings shall also be obligated for obligations set forth in this Agreement. XVI. MODIFICATION OF AGREEMENT. This Agreement may be modified or amended only by the written agreement of the County and the Owner; such written agreement may be by resolution or ordinance at the County’s sole discretion. No statement, action or agreement hereafter made shall be effective to change, amend, waive, modify, discharge, terminate or effect an abandonment of this Agreement in whole or in part unless such statement, action or agreement is in writing and signed by the party against whom such change, amendment, waiver, modification, discharge, termination or abandonment is sought to be enforced. This Agreement may be modified or amended as to a portion of the Property only by the written agreement of the County and the Owner of said portion of the Property. No statement, action or agreement hereafter made shall be effective to change, amend, waive, modify, 20 discharge, terminate, or effect an abandonment of this Agreement in whole or in part unless such change, amendment, waiver, modification, discharge, termination or abandonment is sought to be enforced. The Conceptual; Master Plan is not intended to be rigid, nor to identify exact site plans for future development. The location of roads, buildings, recreational amenities and other elements may vary at the time of permit applications when more specific designs are available, as long as the maximum densities set forth herein and the general concept of environmentally sensitive residential developments suggested by the Conceptual Master Plan is followed and respected, however, reductions in buffers and setbacks in relation to external properties and roadways are major modifications. Such minor variations are eligible to be approved at staff level in accordance with the Zoning Regulations. XVII. NOTICES. Any notice, demand, request, consent, approval or communication which a signatory party is required to or may give to another signatory party hereunder shall be in writing and shall be delivered or addressed to the other at the address below set forth or to such other address as such party may from time to time direct by written notice given in the manner herein prescribed, and such notice or communication shall be deemed to have been given or made when communicated by, i) immediately upon delivery if by personal delivery or by independent courier service or by facsimile or, ii) if by mail on the fifth (5th) business day after the deposit thereof in the United States Mail, postage prepaid, registered or certified or, iii) the day of transmission by electronic mail transmission, if receipt is confirmed or a mailing is made the day of transmission by United State Mail, addressed as hereinafter provided. All notices, demands, requests, consents, approvals or communications shall be given at the following addresses: To Jasper County: County Administrator Jasper County 358 Third Avenue Courthouse Square Post Office Box 1149 Ridgeland, South Carolina 29936 Email: afulghum@jaspercountysc.gov 21 With Copy To: County Attorney Jasper County 358 Third Avenue Courthouse Square Post Office Box 1149 Ridgeland, South Carolina 29936 Email: dtedder@jaspercountysc.gob And to the Owner at: Conduit Street Partners, LLC Peter Zadoretzky, Co-Managing Member 59 Franklin Street Annapolis, Maryland 21401 Email: pzadoretzky@oapartners.com With Copy To: Bouhan Falligant LLP John D. Northup, III One West Park Avenue Savannah, Georgia 31401 Email: jdnorthup@bouhan.com XVIII. ENFORCEMENT. Any party hereto shall have the right to enforce the terms, provisions and conditions of this Agreement (if not cured within the applicable cure period) by any remedies available at law or in equity, including specific performance, and the right to recover attorney’s fees and costs associated with said enforcement. XIX. GENERAL. A. Subsequent Laws. In the event state or federal laws or regulations are enacted after the execution of this Agreement or decisions are issued by a court of competent jurisdiction which prevent or preclude compliance with the Act or one or more provisions of this Agreement ("New Laws"), the provisions of this Agreement shall be modified or suspended as may be necessary to comply with such New Laws. Immediately after enactment of any such New Law, or court decision, a party designated by the Owners and Developer(s) and the County shall meet and confer in good faith in order to agree upon such modification or suspension based on the effect such New Law would have on the purposes and intent of this Agreement. During the time that these parties are conferring on such modification or suspension or challenging the New Laws, the County may take reasonable action to comply with such New Laws. Should these parties be unable to agree to a modification or suspension, either may petition a court of competent jurisdiction for an appropriate modification or suspension of this 22 Agreement. In addition, the Owner, D evelopers and the County each shall have the right to challenge the New Law preventing compliance with the terms of this Agreement. In the event that such challenge is successful, this Agreement shall remain unmodified and in full force and effect. Notwithstanding the foregoing, any adoption by the County of an ordinance assessing Impacts Fees or their equivalent shall be governed by Article XII hereof. B. Estoppel Certificate. The County, the Owner or any Developer may, at any time, and from time to time, deliver written notice to the other applicable party requesting such party to certify in writing: (1) that this Agreement is in full force and effect, (2) that this Agreement has not been amended or modified, or if so amended, identifying the amendments, (3) whether, to the knowledge of such party, the requesting party is in default or claimed default in the performance of its obligations under this Agreement, and, if so, describing the nature and amount, if any, of any such default or claimed default, and (4) whether, to the knowledge of such party, any event has occurred or failed to occur which, with the passage of time or the giving of notice, or both, would constitute a default and, if so, specifying each such event. C. Entire Agreement. This Agreement sets forth and incorporates by reference all of the agreements. conditions and understandings among the County and the Owner relative to the Property and its Development and there are no promises, agreements, conditions or understandings, oral or written, expressed or implied, among these parties relative to the matters addressed herein other than as set forth or as referred to herein. D No Partnership or Joint Venture. Nothing in this Agreement shall be deemed to create a partnership or joint venture between the County, the Owner or any Developer or to render such party liable in any manner for the debts or obligations of another party. E. Exhibits. All exhibits attached hereto and/or referred to in this Agreement are incorporated herein as though set forth in full. 23 F. Construction. The parties agree that each party and its counsel have reviewed and revised this Agreement and that any rule of construction to the effect that ambiguities are to be resolved against the drafting party shall not apply in the interpretation of this Agreement or any amendments or exhibits hereto. This Agreement should be construed so as to effectuate the public purpose of settlement of disputes, while protecting the public health, safety and welfare, including but not limited to ensuring the adequacy of public facilities and compatibility between developed and undeveloped lands and their uses. G. Assignment. Subject to the notification provisions hereof, Owner may assign its rights and responsibilities hereunder to a subsidiary or sister company. H. Governing Law. This Agreement shall be governed by the laws of the State of South Carolina. I. Counterparts. This Agreement may be executed in several counterparts, each of which shall be deemed an original, and such counterparts shall constitute but one and the same instrument. J. Agreement to Cooperate. In the event of any legal action instituted by a third party or other governmental entity or official challenging the validity of any provision of this Agreement, the parties hereby agree to cooperate in defending such action; provided, however, each party shall retain the right to pursue its own independent legal defense. K. Eminent Domain. Nothing contained in this Agreement shall limit, impair or restrict the County's right and power of eminent domain under the laws of the State of South Carolina. L. No Third Party Beneficiaries. The provisions of this Agreement may be enforced only by the County, the Owner and Developers. No other persons shall have any rights hereunder. M. Contingencies. This Agreement is contingent on acquisition of the Property, the approval of the Board of Directors of Owner and the County Council of the Jasper County, South Carolina. Notwithstanding the above, Owner agrees to remain responsible for the payment of the processing fees incurred by the County in reviewing and approving the Planned 24 Development District application and Development Agreement as set forth in Article XI (11) above. N. Recording. Within fourteen (14) days after execution of this Agreement, the Property Owner shall record the agreement with the Jasper County Register of Deeds. The burdens of this Agreement are binding upon, and the benefits of this Agreement shall inure to, all successors in interest and assigns of the Parties to this Agreement. O. Agreement to Run with the Land. This Agreement shall be recorded against the Property as described in Exhibit A attached hereto. The agreements contained herein shall be deemed to run with the land. The burdens of this Agreement are binding upon, and the benefits of the Agreement shall inure to, all successors in interest to the Parties to the Agreement. XX. SUCCESSORS AND ASSIGNS. A. Binding Effect. This Agreement shall be binding on the successors and assigns of the Owner in the ownership or Development of any portion of the Property or the Project. A purchaser, lessee or other successor in interest of any portion of the Property shall be solely responsible for performance of obligations hereunder as to the portion or portions of the Property so transferred. Developers or other assignees of development tracts shall be required to execute a written acknowledgment accepting and agreeing to perform the obligations in this Agreement, said document to be in recordable form and provided to the County at the time of the recording of any deed transferring a development tract. Following delivery of such documents, the previous Owner shall be released of any further liability or obligation with respect to the obligations. B. Transfer of Project . The Property Owner shall be entitled to transfer any portion or all of the Property to a purchaser(s), subject to the following exceptions: 1. Transfer of Facilities and Service Obligations. Simultaneous with the Owner conveying any portion of the Property to a third party, the Owner shall be required to obtain a written agreement in substantially the same form as Exhibit F, attached hereto and incorporated herein by reference, expressly assuming the obligations with regard to the parcel conveyed and the potential Development of same. The Owner shall notify the County within thirty (30) days after the conveyance of the property, provide the County with the applicable documents assigning the 25 development obligations to the transferee and record the same in the office of the Jasper County Register of Deeds. 2. Assignment of Development Rights. Any and all conveyances of any portion of the Property subject to the intensities/square footage set forth in Article VII herein to third party developers shall, by written agreement in substantially the same form as Exhibit E, assign a precise number of residential units and/or commercial/office square footage along with the permitted land uses that may be constructed on the subject property being conveyed. The Owner shall notify the County within thirty (30) days of the conveyance of the property, provide the County with the applicable documents assigning the development rights to the transferee and record the same in the Office of the Jasper County Register of Deeds. 3. Mortgage Lenders. Notwithstanding anything to the contrary contained herein, the exceptions to transfer contained in this Section shall not apply: (i) to any mortgage lender either as the result of foreclosure of any mortgage secured by any portion of the Property or any other transfer in lieu of foreclosure; (ii) to any third party purchaser at such a foreclosure; or (iii) to any third party purchaser of such mortgage lender’s interest subsequent to the mortgage lender’s acquiring ownership of any portion of the Property as set forth above. Furthermore, nothing contained herein shall prevent, hinder or delay any transfer or any portion of the Property to any such mortgage lender or subsequent purchaser. Notwithstanding the foregoing, the obligations and restrictions arising under this Development Agreement run with the land, and a foreclosure or subsequent transfer does not extinguish the obligations and restrictions, arising hereunder, and such shall survive the foreclosure or subsequent transfer. It is the intention of this subsection to merely for ego the prerequisite notice of transfer documentation contained in subsections 1 and 2 immediately above. C. Release of Property Owner. In the event of conveyance of all or a portion of the Property and compliance with the conditions set forth herein, and specifically subsections XX(B) (1) and (2), Conduit Street Partners, LLC shall be released from all obligations as to the portion of Property so transferred, and the transferee shall be substituted as the Owner under the Agreement as to the portion of the Property so transferred. 26 XXI. STATEMENT OF REQUIRED PROVISIONS A. Specific Statements. The Act requires that a development agreement must include certain mandatory provisions, pursuant to Section 6-31-60 (A). Although certain of these items are addressed elsewhere in this Agreement, the following listing of the required provisions is ser forth for convenient reference. The numbering below corresponds to the numbering utilized under Section 6-31-60 (A) for the required items: 1. Legal Description of Property and Legal and Equitable Owners. The legal description of the Property is set forth in Exhibit A attached hereto. The present legal Owners of the Property are Paul H. Anderson, Emily A. Tillman and John F. Anderson. Conduit Street Partners, LLC have an equitable interest in the Property by virtue of a purchase agreement with the present legal Owners. 2. Duration of Agreement. The duration of this Agreement shall be as provided in Article III. 3. Permitted Uses, Densities, Building Heights and Intensities. A complete listing and description of permitted uses, population densities, building intensities and heights, as well as other development related standards, are contained in Zoning Regulations, as supplemented by this Agreement. Based on prior experience with the type of Development contemplated by the Zoning Regulations, it is estimated that the average size household of the Project will be 2.5 persons. Based on maximum density build out, the population density of the Project is anticipated to be approximately 690 to 700 persons. 4. Required Public Facilities. The utility services available to the Property are described generally above regarding water service, sewer service, cable and other telecommunication services, gas service, electrical services, telephone service and solid waste disposal. The mandatory procedures of the Zoning Regulations will ensure availability of roads and utilities to serve the residents on a timely basis. 27 5. Dedication of Land and Provisions to Protect Environmentally Sensitive Areas. All requirements relating to land transfers for public facilities, if any, are set forth above. The Zoning Regulations described above, and incorporated herein, contain numerous provisions for the protection of environmentally sensitive areas. All relevant State and Federal laws will be fully complied with, in addition to the important provisions set forth in this Agreement. 6. Local Development Permits. The Development standards for the Property shall be as set forth in the Zoning Regulations. Specific permits must be obtained prior to commencing Development, consistent with the standards set forth in the Zoning Regulations. Building Permits must be obtained under applicable law for any vertical construction, and appropriate permits must be obtained from the State of South Carolina(OCRM) and Army Corps of Engineers, when applicable, prior to any impact upon freshwater wetlands. It is specifically understood that the failure of this Agreement to address a particular permit, condition, term or restriction does not relieve the Owner, its successors and assign, of the necessity of complying with the law governing the permitting requirements, conditions, terms or restrictions, unless otherwise provided hereunder. 7. Comprehensive Plan and Development Agreement. The Development permitted and proposed under the Zoning Regulations and permitted under this Agreement is consistent with the Comprehensive Plan and with current land use regulations of the County, which include a Planned Development District for the Property. 8. Term s for Public Health, Safety and Welfare. The County Council finds that all issues relating to public health, safety and welfare have been adequately considered and appropriately dealt with under the terms of this Agreement, the Zoning Regulations and existing laws. 9. Historical Structures. Any cultural, historical structure or sites will be addressed through applicable federal and state regulations the permitting 28 process at the time of development, as required by applicable state regulations. No such structures or sites are known to exist. IN WITNESS WHEREOF, the parties hereby set their hands and seals, effective the date first above written. SIGNATURES AND ACKNOWLEDGMENTS BEGIN ON THE FOLLOWING PAGE 29 WITNESSES: CONDUIT STREET PARTNERS, LLC By: Peter Zadoretzky Its: Co-Manager STATE OF ) ) ACKNOWLEDGMENT COUNTY OF ) I HEREBY CERTIFY, that on this ______ day of , 2022. before me, the undersigned Notary Public of the State and County aforesaid, personally appeared the duly authorized official of Conduit Street Partners, LLC., known to me (or satisfactorily proven) to be the person whose name is subscribed to the within document, who acknowledged the due execution of the foregoing document. IN WITNESS WHEREOF, I have hereunto set my hand and official seal the day and year last above mentioned. Notary Public for Maryland My Commission Expires: 30 WITNESSES: JASPER COUNTY, SOUTH CAROLINA _______________________________ By: _____________________________ Barbara B. Clark Its: STATE OF SOUTH CAROLINA. ) ) ACKNOWLEDGMENT COUNTY OF JASPER ) I HEREBY CERTIFY, that on this day of , 2022. before me, the undersigned Notary Public of the State and County aforesaid, personally appeared Barbara B. Clark, Chair of Jasper County Council , known to me (or satisfactorily proven) to be the person whose name is subscribed to the within document, as the appropriate officials of the County of Jasper, South Carolina, who acknowledged the due execution of the foregoing document. IN WITNESS WHEREOF, I have hereunto set my hand and official seal the day and year last above mentioned. Notary Public for South Carolina My Commission Expires: 31 EXHIBIT A TO DEVELOPMENT AGREEMENT PROPERTY DESCRIPTION OF CSP DEVELOPMENT TRACT 32 33 EXHIBIT B-1 TO DEVELOPMENT AGREEMENT PLANNED DEVELOPMENT DISTRICT The Planned Development District approval for CSP Development (the Property hereunder), as adopted in Ordinance O - 2022- 16by the Jasper County Council on June 27, 2022, is hereby incorporated herein by reference, to include all drawings, plans, narratives and documentation submitted therewith, as fully as if attached hereto. The parties hereto may elect to physically attach said documents hereto, or may rely upon the above stated incorporation by reference, at their discretion. 34 EXHIBIT B-2 TO DEVELOPMENT AGREEMENT CONCEPTUAL MASTER PLAN 35 36 EXHIBIT C TO DEVELOPMENT AGREEMENT ZONING REGULATIONS 1. The Jasper County Zoning Ordinance, being codified with Municode© and current on Municode© through Supplement No. 3 as of June 21, 2021 as amended through the Effective Date of this Agreement 2. The Planned District Development (PDD) Conceptual Master Plan dated January 27, 2022 and adopted by Jasper County by Ordinance Number O-2022-16. 37 EXHIBIT D TO DEVELOPMENT AGREEMENT DEVELOPMENT SCHEDULE Development of the Property is expected to occur over the five (5) year term of the Agreement, with the sequence and timing of development activity to be dictated largely by market conditions. The following estimate of expected activity is hereby included, to be updated by Owner as the development evolves over the term. Type of Development Year(s) of Commencement / Completion Rental and/or For Sale 2024 commencement, Residential Single Family expected buildout 2027 As stated in the Development Agreement, Article VI, actual development may occur more rapidly or less rapidly, based on market conditions and final product mix. PDD EXHIBIT A-2 “REDLINE” CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 TABLE OF CONTENTS APPLICANT AND PLANNING TEAM……………………………………………………………………………………. 1 SECTION I – INTRODUCTION AND NARRATIVE………………………………………………………………… 2 A. The Property………………………………………………………………………………………………………………….. 2 B. Planned Development District Process……………………………………………………………………….. 3 C. Conceptual Master Plan………………………………………………………………………………………………… 4 D. Environmental Protection………………………………………………………………………………………………. 5 E. Water and Sewer Service……………………………………………………………………………………………… 5 F. Utility Service…………………………………………………………………………………………………………………… 5 G. Roadways and Traffic…………………………………………………………………………………………………….. 5 H. Tree Preservation and Replacement……………………………………………………………………………. 6 I. Parking…………………………………………………………………………………………………………………………….. 7 J. Stormwater Management………………………………………………………………………………………………. 7 K. Cultural and Historical Resources…………………………………………………………………………………. 7 L. Emergency Services………………………………………………………………………………………………………. 7 SECTION II – LAND USE DESIGNATION AND DEFINITIONS……………………………………………… 8 A. Introduction and Narrative………………………………………………………………………………………………. 8 B. Allowed Land Uses………………………………………………………………………………………………………….. 8 C. Allowed Density and Transfer of Density Between Planning Areas …………………………… 9 D. Definition of Land Use Terms and Density Terms ……………………………………………………….. 9 SCHEDULE OF EXHIBITS: Exhibit A Site Location Map Exhibit I FEMA Flood Zones Exhibit B Conceptual Master Plan Exhibit J BJWSA Availability to Serve Letter Exhibit C Property Aerial Exhibit K Dominion Availability to Serve Letter Exhibit D-1 Jasper County Zoning Map Exhibit L Palmetto Availability to Serve Letter Exhibit D-2 Hardeeville Zoning Map Exhibit M Hargray Availability to Serve Letter Exhibit E Wetlands Deliniation Exhibit N Archaeological Report Exhibit F Boundary Survey Exhibit O Concept Development Schedule Exhibit G USDA Soils Data Exhibit P Fire Station and EMS Locations CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 1 Exhibit H Topography Exhibit Q Thomas & Hutton Traffic Memo APPLI CANT AND PLANNING TEAM Owner………….………………………………………………………………………………………….Paul H. Anderson, Emily A.Tillman & John F. Anderson Developer / Applicant……………………………………..………………………………………………Conduit Street Partners, LLC Annapolis, MD Mr. Peter Zadoretzky Land Planner and Engineer………………………………………………………………………..Thomas & Hutton Engineering Savannah, GA Mr. Lamar Mercer, P.E. Mr. Scott Monson, P.E Carolina Engineering Consultants, Inc Beauf ort, SC Mr. Jeff P. Ackerman, P.E Wetl ands / Environmental Consultant and Permitting…………….Newkirk Environmental Consultants, Inc. Beaufort, SC Mr. Ashley Howell Archaeo logist……………………………………….………………………………………..…………….Brockington & Associates, Inc. Savannah, GA Mr. Alex Sweeney, MA, RPA Land Use Attorney / Legal Counsel……………………………………………………..…………………..Bouhan Falligant LLP Savannah, GA John D. Northup III, Esq. CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 2 CSP DEVELOPMENT PLANNED DEVELOPMENT DISTRICT AND CONCEPTUAL MASTER PLAN SECTION I: INTRODUCTION AND NARRATIVE The Conduit Street Partners, LLC project currently consists of one parcel located in Jasper County, SC. Currently, the parcel is zoned Rural Preservation (“RP”) and is identified as PIN no. 041-00-03-030. The property is approximately 38.84 acres with substantial frontage on the north side of U.S. Highway 278 situated between the Hilton Head Lakes North development to its east and the Prime Storage facility to its west. The property is surrounded by City of Hardeeville land nearly all of which is zoned PDD with a very small area zoned GC (the Prime Storage property). The property has been in the Anderson Family estate for many years and was originally part of the J.A. Coleman Estate. Exhibit A Site Location Map is attached. The property is under agreement to be purchased from the Anderson family members by the Applicant, Conduit Street Partners, LLC, who are pursuing a new PDD zoning encompassing all the parcel to allow for the property to be deve loped under the stipulations set forth by the proposed PDD zoning in accordance with the Jasper County Zoning Ordinance (ZO) and Land Development Regulations (LDR) in effect at the time of submittal of this rezoning application . Upon approval, the benefits of the proposed PDD Standards shall apply to the Applicant I Owner and its successors and assignees. For the purposes of the P DD and Exhibit B Concept ual Master Plan, the parcel is hereby known as a single project ( “CSP Development ”) in this document henceforth. A. THE PROPERTY 1. The CSP Development property is a raw, unimproved forested , predominately uplands parcel in Jasper County. There are no nor have there ever been any existing buildings, structures, or other facilities on the property. The property is surrounded by PDD zoned Hardeeville land to its east, north and south and by Hardeeville GC zoned land to its west. It is bounded on its eastern side by the Hilton Head Lakes North development – a large, golf course residential community and one of the initial phases of the Hardeeville West Argent PDD development project. To the north and contiguous to the CSP Development is an undeveloped, principally forested, and regulated wetlands parcel which is also part of the West Argent PDD development project. West of the property is an existing Prime Storage facility situated on land located in Hardeeville and zoned GC. The southern property line of the property is frontage along the north side of highway U.S. 278 – a four lane divided, center median, limited access highway. And on the other/south side of U.S. 278 across the highway from the CSP Development there are two major Hardeeville PDD land parcels. One of the parcels is a part of the existing Latitude Margaritaville development and is at the present time planned to be Margaritaville’s future 70-acre retail/commercial phase. The second parcel that is to the west and contiguous with the Latitude Marga ritaville land is another very large Hardeeville PDD land parcel known as the Morgan PDD project . Both land tracts on the south side of U.S. 278 immediately across the highway from the proposed CSP Development are raw, unimproved but PDD zoned properties with existing Hardeeville CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 3 development agreements. Combined, the West Argent PDD, the Latitude Margaritaville PDD and the Morgan Tract PDD amount to approximately 10,500 acres of Hardeeville development parcels zoned PDD. The CSP Development 38.84-acre parcel has just under 2,700 feet of frontage along the north side of U.S. 278 and will access this highway at one central location in alignment with an existing median break. The CSP Development property will also have access to existing Brickyard Road at the road’s eastern termination point which is located at the property’s western property line. A Property Aerial (Exhibit C), a Jasper County Zoning Map (Exhibit D-1) and a Hardeeville Zoning Map (Exhibit D-2) are provided. 2. The proposed PDD consists of approximately 38.84 acres and has an anticipated area of approximately 37 acres of uplands and approximately 1.5 acres of jurisdictional wetlands, and 0.5 acres of non- jurisdictional wetlands (excluded waters – gum pond) based upon a preliminary wetland exhibit prepared by Newkirk Environmental, dated December 2021 (see Exhibit E Wetlands DeliniationDelineation). The delineation of the wetlands within the property have been submitted to the Army Corps of Engineers to obtain a valid Jurisdictional Determination. The Conceptual Plan has taken into account the jurisdictional wetlands and has avoided any development impacts to these areas. The property does not have any critical area or frontage on salt marsh or creeks. 3. Exhibit F Boundary Survey depicts the property boundary. 4. Exhibit G USDA Soils Data depicts soils types of the property . 5. Exhibit H Topography depicts topographic information for the CSP Development property. GIS data topography was used for the purposes of the exhibit. Elevations on the site range from elevation 10.0 along its northern edge sloping quickly upwards to the property’s interior where grades are relatively flat averaging between elevations 18.0 to 20.0 with two small knolls on the west end of the property averaging elevation 24.0. Exhibit I FEMA Flood Zones Map depicts the 2019 FEMA flood zones which indicate that the property is in FEMA zone “X” which is defined to be an area of minimal flood hazard generally above or outside the 500- year flood level. Finished floor elevations of building structures will adhere to current Flood Zone requirements of the Jasper County Land Development Regulations. B. PLANNED DEVELOPMENT DISTRICT PROCESS 1. The Planned Development District (P DD) was established by the Jasper County to encourage flexibility in the development of land to promote its most appropriate, economical, and efficient use as well as to encourage creative design and produce a better environment particularly for large undeveloped tracts. The purpose of the PDD is to, among other things, permit development for specialized purposes which are planned and developed on a unified basis. In this case the specialized purpose is a first-class Single-Family Rental Home (“SFR”) community as proposed by Conduit Street Partners, LLC . The homes themselves will be of unique design, tasteful architecture and generally resemble residential cottage, villa and/or patiosingle family detached and townhouse home types. The community will be under one owner ship structure which will maintain most all aspects of the community, i.e., its infrastructure including its roads , the interior and exteriors of the homes and the grounds on which they are constructed including the community amenities and open spaces. CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 4 C. CONCEPTUAL MASTER PLAN It i s anticipated that the Conduit Street Development property will be developed over a period of no more than four to five years in as many as two phases in accordance with the Conceptual Master Plan as set forth in this document and as the same may be supplemented by subsequent master and development plans submitted pursuant to the provisions of this PDD (see Exhibit N Concept Development Schedule). The Conceptual Master Plan sets forth the general scope of the development including number of allowed units , development standards, infrastructure requirements, and other guidelines. In addition to the Conceptual Master Plan, development of the Property will be controlled by other provisions of the PDD. The goal o f this PDD is to produce a development that raises the quality of life and development standards in the area while also anticipating the County’s existing and future needs for naturally affordable single-family homes. The Conduit St reet Development Conceptual Master Plan displays a general and privately owned and maintained roadway layout , general housing unit layout , open space areas as well as amenities that will serve the property. The final l ocations of these site elements may vary at the time of development permit. Proposed land uses in the development are detailed under Section 2 - Land Use Designation and Definitions. The Conceptual Master Plan seeks to maintain open space requirements set forth in Section II, D.3 of this PDD. The open space and amenities will be owned and maintained by the Applicant I Owner, or other legally designated entity. Property deeded to a governmental or private utility entity will be the maintenance responsibility of that entity. The Conceptual Master Plan and the provisions of this P DD will constitute the zoning for the Property and a waiver from the current Jasper County codes and regulations where differences occur. However,, activities in the PDD shall conform to all other Jasper County Zoning Ordinance and Land Development Regulations where differences do not occur. The provi sions of the Conceptual Master Plan shall apply to development of the property. In the event of a conflict , the hierarchy of documents will be the “to be approved”, (i ) Development Agreement (DA), (ii) the PDD and Conceptual Master Plan and, (iii) the Master Plan (MP). D. ENVIRONMENTAL PROTECTION 1. As part of the development process , the CSP Development will meet or exceed the stormwater management requirements of Jasper County, and the requirements of South Carolina Department of Health and Environmental Control (DHEC) and Office of Ocean and Coastal Resource Management (OCRM) .The Applicant I Owner will prepare stormwater management plans for the project as it is developed in acc ordance with a stormwater drainage master plan to be prepared by a professional engineering firm licensed by the State of South Carolina. The stormwater drainage master plan will address the hydrological characteristics of the entire site as well as adjacent drainage patterns of relative importance. The plan will address pre-development conditions and post -development stormwater management for flood control and sediment reduction. This plan will also address storm water quality through, among other things, the use of CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 5 several types of BMP's (as established by the stormwater standards of the applicable state and federal governmental regulations) to enhance water quality and protect the adjacent wetlands. 2. Approximately 4 percent of the site consists of regulated jurisdictional wetlands. Exhibit E is a preliminary wetland plan prepared by Newkirk Environmental dated December 2021 which depicts the preliminary observation of wetlands vs uplands for the project area. The wetland plan has been submitted to the Army Corps of Engineers to obtain a jurisdictional determination prior to development of the property. 3. There will be no development impacts to the regulated jurisdictional wetlands. Subject to the approval of the Office of Ocean and Coastal Resource Management, the CSP Development will seek to remove/fill the non-regulated “gum pond” located in proximity to the project’s proposed main entrance off highway U.S. 278. E. WATER AND SEWER SERVICE Water and se wer service will be provided to the CSP Development by Beaufort Jasper Water and Sewer Authority. Preliminary planning for the water and sewer systems will be provided at the time of Initial Master Plan subm ittal to Jasper County. Preliminary discussions with Beaufort - Jasper Water and Sewer Authority (BJWSA) indicate a willingness to serve the property. BJWSA operates and maintains water and sewer systems within their service area upon completion by the developer and acceptance by the Authority. See Exhibit J BJWSA Availability to Serve Letter. F. UTILITY SERVICE 1 . The CS P Development property is in the service territory of Dominion Energy tor natural gas services, See Exhibit K Dominion Energy Availability to Serve Letter . The Applicant I Owner will coordinate with Dominion Energy regarding planning for the CSP Development project. 2. The CSP D evelopment property is in the service territory of Palmetto Electric Cooperative tor electric services, See Exhibit L Palmetto Availability to Serve Letter. The Applicant I Owner will coordinate with Dominion Energy regarding planning for the CSP Development project. 3. Hargray or/or another licensed provider will provide internet and communication services to the CSP Development property . The Applicant/Owner will coordinate with the provider regarding planning and installation of these services. All servicing is anticipated to be via f iber optics cable to include broadband capability. See Exhibit M Hargray Availability to Serve Letter. 4. Othe r Utility services shall be provided by legally established ent ities at the discretion of the Applicant I Owner, provided such are in accordance with the franchising ordinances/licensing with the County. 5. Utilities will be underground except as reasonably necessary for above ground support facilities. G. ROADWAYS AND TRAFFIC CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 6 1. The CSP Development PDD shall have on-site roads designed and constructed to the standards of the Jasper County Land Development Regulations or other engineering standards reasonably acceptable to the Jasper County Engineer. Roadway construction within SC DOT right-of-way's will be in accordance with SCD OT standards. Roadway section details wil l be submitted for review at time of development permit approval. Interconnectivity to other adjoining tracts of land is not proposed. Public access into or across other private developments will not be required. Roadway design standards may be modified subject to the approval of Jasper County to reduce environmental impacts provided safety concerns are not compromised. All onsite roads shall be privately owned and maintained. 2. The A pplicant I Owner intends to create up to three new points of vehicular access to existing public roads and highways for the project . The first is proposed to be a main entrance ingress and egress to U.S. 278 located and aligned with the center most existing highway median cut. The second access location i s anticipated to provide ingress and egress to U.S. 278 at the highway’s median cut fronting the eastern end of the property. The third point of vehicular connectivity is planned as a proposed connection with existing Brickyard Road at the roads point of termination at the property’s western property line and adjacent to the U.S. 278 right-of-way. A traffic plan study will be provided at the Master Plan stage. The traffic study shall be reviewed by the SCDOT and final configuration for the new accesses will be governed by the SC DOT. Final entrance configuration and locations w ill be based upon SCD OT guidelines at the time of development permit. 3. Acces s to the CSP Development PDD may be restricted and/or gated appropriately at the Applicant I Owner's discretion. Sidewalks and possibly trails shall be provided within the PDD at appropriate locations. The frequency and location of sidewalks or pathways shall be established based upon anticipated pedestrian circulation within the project. Sidewalks and trails shown on the Conceptual Master Plan are conceptual in nature and are subject to change over the course of the development permit process. 4. Notwi thstanding the provisions of section G hereof, roadway design standards may be modified to reduce environmental impacts provided safety concerns are not compromised. To protect and preserve significant natural property attributes including avoiding wetland impacts, such design will be encouraged. 5. Referenc e Thomas & Hutton Traffic Memo Exhibit Q for preliminary traffic analysis and commentary concluding no material traffic impacts to existing road systems. 6. TREE P RESERVATION AND REPLACEMENT The CSP Development shall meet or exceed the minimum allowable post development tree coverage requirements of Jasper County . Trees required and/or worthy of preserving shall be incorporated into buffer areas around jurisdictional wetlands , in required buffer yards and in the required Highway Corridor Overlay District 50’ buffer parallel and adjacent to the U.S. 278 Highway. In those c ases where the minimum allowable tree coverage cannot be met by preservation within a required buffer area, replacement trees shall be planted to meet the tree types and quantities as required by code. Trees to be preserved in buffer areas shall be identified and located by a tree survey within the CSP Development PDD. CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 7 Plantings, including trees, situated in any buffer area shall be maintained in good health and any dead or damaged plants will be replaced. And if any tree in a buffer is severely damaged due to weather or other reasons, all severely damaged trees shall be replaced no later than the end of the next dormant season. I. PARKING Parking for the CSP Development community shall be provided by a combination of attached and/or detached residential parking garages and their corresponding driveways, and community surface parking lots for overflow parking, the community amenity areas and leasing offices . All parking shall be generally consistent with Jasper County development standards or as otherwise proposed by the Applicant/Owner and approved by Jasper County. J. STORMWATER MANAGEMENT The CSP Development PDD shall conform to the Stormwater Management Provisions of the Jasper County Land Development Standards including but not necessarily limited to the Jasper County Stormwater Management Design Manual and applicable state and federal requirements. Among other things, the post-development peak runoff discharge rate for the 2-, 10- and 25-year, 24-hour design storm events will be designed to control these rates to pre-development discharge rates. Additionally, the CSP Development PDD shall design its stormwater system to manage a 100-year, 24-hour storm event without causing damage to on-site and offsite structures. Sufficient stormwater best management practices will be employed in the development of the P DD to ensure runoff leaving the site does not degrade water quality of the surrounding receiving waters. K. CULTURAL AND HISTORICAL RESOURCES As part of a comprehensive study of the property a Phase I and Phase II archeological investigations and studies were conducted by Brockington & Associates. The investigations have concluded that there are no archeological sites eligible for the National Register requiring preservation or management considerations on the property. Exhibit N Archaeological Report is attached. L. EMERGENCY SERVICES Fire and emergency medical services will be provided to the residents of the CSP Development by no less than two Jasper County Fire-Rescue stations which are located less than 5 miles from the property. FIRE STATION AND EMS LOCATIONS EXHIBIT P is attached identifying Jasper County Fire Stations 34 and 35 and their distances (each less than 5 miles) and times in route to the CSP Development. CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 8 SECTION II: LAND USE DESIGNATION AND DEFINITIONS A . INTRODUCTION and NARRATIVE The Conceptual Master Plan consists of an area of approximately 38.84 acres. The proposed predominate uses shall include but not be necessarily limited to: • For-Rent Single Family Residential situated on an uns ubdivided parcel(s) and/or on subdivided individual platted lots • Single Family For Sale Residential situated on subdivided individual platted lots • Active and passive community amenity areas • Model homes and leasing and sales centers • Site infrastructure The land use areas indicated on the Conceptual Master Plan are not intended to be rigid exact boundaries for future improvements. The Conceptual Master Plan PDD for the CSP Development shall maintain flexibility to accommodate specific soils conditions, environmental concerns, physical constraints, market conditions and design parameters and as such, the exact location of boundary lines and any proposed buildings or structures, between land uses and their subsequent location and size indicated within the planning area shall be subject to change at the time of the Master Plan Phase and Development Permit Plan submission; provided that maximum densities and other conditions of the Development Agreement between the Applicant / Owner and Jasper County, South Carolina will be adhered to strictly, unless adjustments are requested by the Applicant / Owner and approved by Jasper County. All rental residential dwelling units shall be owned, controlled and maintained by the Applicant or its assigns or successors which units may be located on an unsubdivided parcel or individual platted lots., amenitiesAmenities, on-property infrastructure and improvements not dedicated or otherwise conveyed to public or private third parties (such as a homeowner’s association) shall beshall be owned, controlled and maintained by the Applicant / Owner or its successors. If at any time in the future rental homes that are situated on subdivided platted lots are sold and owner occupied, these housing units shall be owned, controlled, and maintained by their individual owners. B. ALLOWED LAND USES The following land uses shall be permitted in the CSP Development PDD. The purpose of this portion of the PD D document is to state which land uses shall be allowed within the CSP Development PDD and to clearly define development within the area. However, by allowing these uses this does not obligate the Applicant / Owner to provide all of the uses or facilities herein. The allowed land uses and definitions shall be as follows: For-Rent and/or For Sale Single Family Residential • For-Rent Single Family Residential Dwelling - A detached or attached home used CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 9 exclusively for residential purposes which is either (i) leased to its tenant(s) located on a single parcel of unsubdivided land or on subdivided platted landlots and/or (ii) detached or attached homes sold to buyers/homeowners which homes shall be located on single subdivided platted lots . Dwelling units may have either private or shared access. Units may be arranged in a variety of configurations including detached, attached, back-to-back, side to side, vertical or any combination thereof. • Home Sites - Individual un-platted parcels or individual platted sites lots available for short or long-term lease for the rental homes or for owner occupied homes. • Amenity Areas - including Club House / swimming pool / playground / bocce ball / cornhole / horseshoes / oyster tables / pickleball and tennis courts / amphitheater / fitness facility or other recreational amenities. • Mail kiosks including drone delivery station(s) • Utilities • Recreational Amenity Uses such as, but not limited to: o Dog park o Multi-use field(s) o Gazebo o Kayak, canoe and boat storage areas o Trails or sidewalks o Bike paths o Mini-golf and/or golf putting green o Pavilion o Grilling areas o Common open space and other active and passive recreational uses o Maintenance Areas or Buildings o Planting/vegetable garden(s) Design Standards and Regulations may be establ ished for each area and use at the time of development permit, unless agreed at development permit approval or in this PDD, the standard for uses from the Jaser County Land Development Regulations shall apply. Any easement that occurs within the property shall have the same land uses as any of the adjacent land uses. Any restrictions shall be based on the legal definition of the easement. C. ALLOWED DENSITY WITHIN PLANNING AREAS 1. Preliminary planning for the Property contemplates the For-Rent Residential land uses {including wetlands) for the entire property as depicted on the Conceptual Master Plan. The Conceptual Master Plan layout may be modified at the time of development permit application. 2. The total project is allowed a maximum of 275 For-Rent, Single Family Dwelling Units. The maximum size per dwelling unit shall be 2,500 square feet. The minimum dwelling unit shall be 800 square feet. The size and configuration of anticipated dwelling u nits displayed on the Conceptual Master Plan may be modified at the time of development permit. The submitted Conceptual Site Plan presently indicates 265 For-Rent, Single Family Dwelling Units. 3. Overall residential density may include both Attached and Detached Single Family Residential dwelling units. CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 10 D. DEFINITIONS OF LAND USE TERMS AND DENSITY TERMS In the absence of a term definition in this Conceptual Master Plan or in the proposed CSP Development PDD with Jasper County, the definitions of the Jaser County Land Development Regulations shall apply in the interpretation of this Conceptual Master Plan. The definitions below shall generally describe the allowed uses and terms within the CSP Development PDD. 1. Acre a. Gross Acre shall mean the entire acreage within the site boundaries. b. Net Acre shall mean the acre which remains after deduction of easements for existing utilities, wetland buffers, and onsite wetlands. 2. Maintenance Areas The maintenance areas w ill contain the facilities , tools, and equi pment necessary to maintain the common properties and amenit ies within the CSP Development PDD. These facilities may be congregated on a central site or located in separate convenient sites for different services such as general community mai ntenance, recreation area maintenance or individual property regime maintenance. Permitted uses include: a. Storage of vehicles and parts , boats, recreational vehicles . tools, supplies, and resident storage. b. Offices associated with community and maintenance. 3. Open Space Total open space for the Property shall be calculated for the boundary of the Property and not on a s ite-specific basis for each par cel or phase of the Property , individual development. or project. The Property shall provide at least 10% open space. Open space shall be calculated based upon the total gross acreage. Open space shall consist of the following: a. Landscape s urface areas (areas not covered by buildings , parking. impervious surface) including manicured village greens or equivalent b. Lagoons, ponds, impoundments, and lakes (detention, retention, or recreational) c. Freshwater wetlands d. Wetland buffers e. Forest, wildlife preserves / corridors, conservation areas and greenbelts f. Community Park, amenity areas and community garden plots g. Recreation areas includi ng swimming pools, tennis courts, playgrounds , multi-purpose fields, lawn games, gardens, etc. h. Pedestrian / bicycle trails /paths /nature trails i. Perimeter buffers 4. Setbacks, Lot Sizes and Buffers CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 11 a. There shall be no minimum setbacks applied to the CSP Development PDD unless noted otherwise in this PDD document. Setbacks and buffers sha ll meet the minimum requirements established herein, and except as set forth in this P DD Standards, s hall apply to the pe rimeter of the P DD on ly provided, however, that any requi red wetlands buffers shall apply according to law throughout the Property. b. Setbacks /buffer areas shall be provided for jurisdictional wetlands within the PDD. Setbacks / buffers for wetlands shall be 25 feet . c. Perimeter buffer standards shall include: (i) At adjacent property boundaries to the east and to the north of the PDD ( adjacent properties to east and north are jurisdictional wetlands) buffers shall be 20 feet at a m inimum. See P DD Conceptual Master Plan for proposed perimeter buffers. A 50-foot buffer shall be provided along the property’s boundary with the GC zoned property to its west. Underground utilities and stormwater management facilities are allowed in the perimeter buffer area. (ii) At all buffers of the PDD, disturbances related to grading activities are allowed prov ided that the following preservati on practices are met: (A) Within 50- foot U.S. 278 highway buffer a minimum of 7 broadleaf overstory trees, 8 understory trees, and 35 shrubs shall be preserved or re-planted per 100 linear feet of U.S 278 frontage. (iii) Highway 278 Corridor Overlay District (HCOD) standards shall be adhered to provided that signage shall be governed by the provisions established by the future Master Plan. CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 12 (iii) d. Lot Areas and Setbacks (i) Single Family For Rent Homes and Single Family For Sale homes will have setback and yard requirements as set forth in the below TABLE 1: CSP PDD DEVELOPMENT TABLE 1 MEASUREMENTS FOR UNSUBDIVIDED AND SUBDIVIDED RESIDENTIAL Single Family Schedule of Lot Area, Yard, and Setbacks Minimum Lot Per Unit SF Patio4 Duplex5 Townhome6 Non-Resi7 Unsubdivided Residential (For Rent Only)1 NA NA NA NA NA Subdivided Residential (For Sale and/or For Rent) 1700 NA NA 1000 NA Minimum Yard and Building Setback (feet) Single Family & Non-Residential Uses SF Patio4 Duplex5 Townhome6 Non-Resi7 Unsubdivided Residential Min lot width 2 NA NA NA NA NA Subdivided Residential Min lot width 30 NA NA 18 NA Front Yard (Measured from Edge of Road R/W) Major Street (Multi-Lane) NA NA NA NA Major Street (Multi-Lane) NA NA NA NA Minor Street 10 NA NA 10 NA Side Yard3 Residential 5 NA NA 5 Non-Residential NA Rear Yard3 Residential 10 NA NA 5 Non-Residential N/A Notes: 1. "For Rent" homes can be situated on an unsubdivided single parcel and not on individual subdivided lots. Therefore, there are no legal fee simple lots with defined lot areas. CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 13 2. Because the "For Rent" homes can be situated on a unsubdivided single parcel and not on individual subdivided fee simple lots, there are no defined lot dimensions. 3. For unsubdivided rental residential units, yard dimensions provided are minimum side yard and back yard depths. In all cases, there shall be 10' minimum clear between structures. 4. Patio homes are not an included product. 5. Duplexes are not an included product. 6. Townhomes are two or more attached units with 5' side yards at each end unit with 10' clear between adjacent structures. 7. Non-Resi is a non-residential/commercial use exclusive of community amenity improvements and leasing and sales offices. Non-Resi uses are not an included product. 8. Setbacks are measured to the front, side or rear face of the principal structure and excludes measurements to such things as HVAC equipment, stoops, ground level or upper-level decks, or similar ancillary structures. 9. The required easement width for storm drainpipe of 15” to 24” in size shall not be less than 10 feet. 5. Wetlands This designation allows the following uses within wetlands. Freshwater wetlands on the property shall be those areas over which the applicable governmental agencies claim jurisdiction for freshwater wetlands. Unless restricted via a future Memorandum of Understanding (MPA) to the contrary, the following are permitted uses: a. Open space and buffers b. Conservation areas c. Activities in all wetland areas as permitted by the U.S. Army Corps of Engineers and/or the South Carolina Department of Health and Environmental Control, Office of Ocean and Coastal Resource Management as applicable d. Disposal of reclaimed water as permitted by SCDHEC. e. Boardwalks, trails, bridges, and other permitted structures. f. Game Management 6. Utilities This designation allows for utility service to serve the planning areas of the CSP Development PDD. The following land uses shall be allowed only after written approval from the Applicant I Owner and its consul tants for location and design. Screening, buffering, and other aesthetic matters must meet or exceed the Jaser County Land Development Regulations and may be approved at the time of site devel opment application. a. Potable water supply and distribution b. Wastewater collection, treatment, and disposal c. Stormwater collection, treatment and detention d. Irrigation e. Communication towers CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024 Page | 14 f. Satellite antennas g. Cable television facilities h. Telephone facilities i. Power transmission and distribution j. Fiber optic lines k. Other utility services i.e., Internet access and other tel ecommunication uses Certain comm unity-wide infrastructure is required for the devel opment of any large, master-planned community. T his infrastructure may inc lude, but is not limited to the following: 1. Arterial streets and primary access roads 2. Water supply 3. Wastewater Treatment and Effluent Disposal 4. Power substations 5. Central telephone facilities/ Cell phone towers 6. Stormwater Management Lagoons 7. Natural Gas Supply 8. Sewer Pump Station Infrastructure serving the community (on-site and off-site) will be approved as part of the development plan approval process. 7. Design Standards Design Standards shall be submitted at the Master Plan stage and may have standards deviating from the Jasper County Ordinances or this PDD, provided that health, safety, ingress/egress, and fire protection are addressed to the satisfaction of the County. EXHIBIT B CONCEPTUAL MASTER PLAN Residential 1 STATE OF SO UTH CAROLINA ) DEVELOPMENT AGREEMENT ) COUNTY OF JASPER ) CSP DEVELOPMENT TRACT This Development Agreement ("Agreement") is made and entered this day of , 2022 (the “ Effective Date”), by and between Conduit Street Partners, LLC (a Maryland Limited Liability Company) ("Owner") and the governmental authority of the Jasper County, South Carolina ("County"). WHEREAS, th e legislature of the State of South Carolina has enacted the "South Carolina Local Government Development Agreement Act (the "Act") as set forth in Sections 6- 31-10 through 6-31-160 of the South Carolina Code of Laws (1976), as amended; and, WHEREAS , the Act recognizes that the lack of certainty in the approval of development can result in a waste of economic and land resources, can discourage sound capital improvement planning and financing, can cause the cost of housing and development to escalate, and can discourage commitment to comprehensive planning." [Section 6-31-10 (B)(1)]; and, WHEREAS, the Act also states: "Development agreements will encourage the vesting of property rights by protecting such rights from the effect of subsequently enacted local legislation or from the effects of changing policies and procedures of local government agencies which may conflict with any term or provision of the Development Agreement or in any way hinder, restrict, or prevent the development of the project. Development Agreements will provide a reasonable certainty as to the lawful requirements that must be met in protecting vested property rights, while maintaining the authority and duty of government to enforce laws and regulations which promote the public safety, health, and general welfare of the citizens of our State." [Section 6-31-10 (B)(6)]; and, EXHIBIT B-2 "REDLINE" 2 WHEREAS, the Act further authorizes local governments, including County governments, to enter Development Agreements with owners to accomplish these and other goals as set forth in Section 6-31-10 of the Act; and, WHEREAS, Owner is the contract purchaser of approximately 38.84 acres, generally to be known as CSP Development, and being more particularly described in Exhibit A and proposes to develop, or cause to be developed, therein Residential uses, to include the potential of any alternative allowed uses, including accessory and complimentary uses as described in the Planned Development District Standards adopted contemporaneously herewith by separate County Ordinance No. O-2022-16; and, WHEREAS, the County seeks to protect and preserve the natural environment and to secure for its citizens quality, well planned and designed development and a stable and viable tax base; and, WHEREAS, the County finds that the program of development proposed by Owner for this Property is consistent with the County’s comprehensive land use plan; and will further the health, safety, welfare and economic well-being of the County and its residents; and, WHEREAS, the program for development of the Property presents an opportunity for the County to secure quality planning and growth to protect the environment and strengthen and revitalized the tax base; and, WHER EAS, this Development Agreement is being made and entered between Owner and the County, under the terms of the Act, for the purpose of providing assurances to Owner that it may proceed with its development plan under the terms hereof, as hereinafter defined, consistent with Jasper County Zoning Ordinance and the Planned Development District Standards for the CSP Development (as herein defined) without encountering future changes in law which would affect the ability to develop under the Jasper County Zoning Ordinance and the Planned Development District Standards for the CSP Development Tract, and for the purpose of providing important protection to the natural environment and long term financial stability and a viable tax base to the County, and for the purpose of providing certain funding and funding sources to assist the County in meeting the service and infrastructure needs associated with the 3 development authorized hereunder; NOW THEREFORE, in consideration of the terms and conditions set forth herein, and other good and valuable consideration, including the potential economic benefits to both the County and Owner by entering into this Agreement, and to encourage well planned development by Owner, the receipt and sufficiency of such consideration being hereby acknowledged, the County and Owner hereby agree as follows: I. INCORPORATION. The above recitals are hereby incorporated into this Agreement, together with the South Carolina General Assembly findings as set forth in Section 6-31-10(B) of the Act. II. DEFINITIONS. As used herein, the following terms mean: "Act" means the South Carolina Local Government Development Agreement Act, as codified in Sections 6-31-10 through 6-31-160 of the Code of Laws of South Carolina (1976), as amended; incorporated herein by reference. “Adjustment Factor” shall mean the greater of three percent 3% per annum or the annual inflation factor supplied to local governments by the SC Department of Revenue and Fiscal Affairs for use by local governments in determining allowable millage increases, such adjustment to be applied on July 1 st of each year with the first adjustment being applied July 1, 2023. “Agreement” shall mean this Development Agreement as amended by the County and Developer in writing from time to time. “Association” shall mean one (1) or more property owners’ associations established to maintain portions of the Property, if such is ever formulated, which is not expected if the for th at portion(s) of the Property that is developed as rental units which are under single ownership, as contemplated under the PDD. 4 “BJWSA” shall mean the Beaufort/Jasper Water and Sewer Authority, its successors or assigns. “Civic Fund” shall mean the segregated interest bearing Escrow Account into which all Development Fees for Police, EMS and Fire are contributed pursuant to Section XI herein. “Conceptual Master Plan” shall mean the Conceptual Master Plan adopted as part of the Planned Development District Standards (“CSP PDD Standards”) by the County,. “CSP PDD” means the Planned Development District for the CSP Development approved by the County by Ordinance Number 0-2022-16, concurrently with its approval of this Agreement “CSP PDD Standards” means the development standards applicable to the CSP PDD, including the Conceptual Master Plan, as adopted by the County in connection with its approval of the CSP PDD, attached hereto or incorporated by reference as Exhibit B. “Current Legal Owner” means Paul H. Anderson, Emily A Tillman, and John F. Anderson, who have contracted with Conduit Street Partners, LLC to sell the Property. “County” shall mean Jasper County, South Carolina. “DHEC” shall mean the South Carolina Department of Health and Environmental Control “Developer” means the Owner, along with any and all successors in title, assigns or lessees of the Owner who are transferred in writing from the Owner all or a portion of the Development Rights under this Agreement and undertake Development of any portion of the Property, as applicable in the context where such term is used. "Development" means the development of portions of the Property as contemplated in the Zoning Regulations. “Development Fees” or “Developer Fees” shall have the meaning set forth in Paragraph XI. "Development Rights" means Development undertaken by the Owner or Developers in accordance with the Zoning Regulations and this Development Agreement 5 “OCRM” means the South Carolina Office of Ocean and Coastal Resource Management "Owner" means Conduit Street Partners, LLC, a Maryland limited liability company, its corporate successors and any assignee, whereby such interest is assigned in writing to it by Owner. Owner has a present equitable interest in the Property by virtue of a contract to purchase with Current Legal Owner. “Park Fund” shall mean the segregated interest bearing Escrow Account into which all Development Fees for Parks are contributed pursuant to Section XI herein. “CSP Development”, “CSP Tract” or “Property” means that certain tract of land described on Exhibit A, as may be amended with the Agreement of the County and Owner. “Project” means the Development that will occur within and upon the CSP Tract. “Roadway Fund” shall mean the segregated interest bearing account into which all Development Fees for Roads are contributed until utilized for public roadway improvements pursuant to Section XI herein. "Term" means the duration of this agreement as set forth in Section III hereof. “Zoning Ordinance” means the Jasper County Zoning Ordinance adopted November 13, 2007, as amended through the Effective Date hereof, and attached hereto as Exhibit C and incorporated herein by reference. "Zoning Regulations" means the CSP PDD establishing a Planned Development District for the Property, and all the attachments thereto, including but not being limited to the PDD Conceptual Master Plan, all narratives, applications, and site development standards thereof (a copy of all of which is attached hereto marked Exhibit B and/or incorporated herein by reference), all as same may be hereafter amended by mutual agreement of the County and the Owner, this Development Agreement, and the Jasper County Development Ordinance(s) being codified with Municode© and current on Municode© through Supplement No. 3 as of June 21, 2021 as amended through the Effective Date of this Agreement, except as the provisions thereof may be 6 clarified or modified by the terms of the CSP PDD and this Agreement, and all other applicable statutes, ordinances and regulations governing uses and development of the Property. III. TERM. The term of this Agreement commenced on the date this Agreement was executed by the County and Owner and terminates Five (5) years thereafter (“Termination Date”). This is the maximum initial term permitted by law for the Property. Nothing in this Agreement shall be interpreted to preclude the Parties from extending the Termination Date by mutual agreement or from entering into subsequent development agreements. IV. DEVELOPMENT OF THE PROPERTY. The Property shall be developed in accordance with the Zoning Regulations and this Agreement. All costs charged by or to the County for reviews required by the Jasper County Zoning and Development Ordinance(s) shall be paid by the Owner or Developer or other party applying for such review as generally charged throughout the County for plan review. The County shall, throughout the Term, maintain or cause to be maintained, a procedure for the processing of reviews as contemplated by the Zoning Regulations and this Agreement. V. CHANGES TO ZONING REGULATIONS. The Zoning Regulations relating to the Property subject to this Agreement shall not be amended or modified during the Term, without the express written consent of the Owner except in accordance with the procedures and provisions of Section 6- 31-80(B) of the Act, which Owner shall have the right to challenge. Owner does, for itself and its successors and assigns, including Developers and notwithstanding the Zoning Regulations, agrees to be bound by the following: 1. The Owner shall be required to notify the County, in writing, as and when Development Rights are transferred to any other party. Such information shall include the identity and address of the acquiring party, a proper contact person, the location and number of acres of the Property transferred, and the number of residential units and/or commercial acreage and square footage of structure, as applicable, subject to the transfer. Developers 7 transferring Development Rights to any other party shall be subject to this requirement of notification, and any entity acquiring Development Rights hereunder shall be required to file with the County an acknowledgment of this Agreement and a commitment to be bound by it. 2. The Owners and Developers, and their respective heirs, successors and assigns agree that all Development, with the exception of irrigation, incidental maintenance facilities, and similar amenities which exist from time to time, and facilities existing at the date of this Agreement will be served by potable water and public sewer prior to occupancy, except as otherwise provided herein for temporary use, temporary being defined as one year or less. Septic tanks and/or wells may be allowed with the permission of BJWSA where there is a specific finding that such use for specific portions of the Property will comply with the overall environmental standards. VI. DEVELOPMENT SCHEDULE. The Property shall be developed in accordance with the development schedule, attached as Exhibit D, or as may be amended by Owner or Developer(s) in the future to reflect actual market absorption. Pursuant to the Act, the failure of the Owner and any Developer to meet the initial development schedule shall not, in and of itself, constitute a material breach of this Agreement. In such event, the failure to meet the development schedule shall be judged by the totality of circumstances, including but not limited to the Owners and Developer(s) good faith efforts to attain compliance with the development schedule. These schedules are planning and forecasting tools only and shall not be interpreted as mandating the development pace initially forecast or preventing a faster pace if market conditions support a faster pace. The fact that actual development may take place at a different pace, based on future market forces, is expected and shall not be considered a default hereunder. Development activity may occur faster or slower than the forecast schedule, as a matter of right, depending upon market conditions. Furthermore, periodic adjustments to the development schedule which may be submitted unilaterally by Owner / Developers in the future, shall not be considered a material amendment or breach of the Agreement. VII. DENSITY. The criteria as set forth in Section II of the CSP PDD Standards shall apply with respect to lot size, frontage, setbacks, impervious surface and height requirements, respectively, within the 8 Project. Residential density and types on the Property shall be the densities and types as set forth in the CSP Planned Unit Development approval, Conceptual Master Plan, and as set forth below: 1. Up to a maximum of 275 residential dwelling units may be constructed. The CSP PDD and the CSP Conceptual Master Plan depict the expected mix and general location of allowed residential units, however, so long as the total residential unit count does not exceed 275 units and the general concept of development as shown on the Conceptual Master Plan is followed, the Owner shall be allowed to alter location and product mix among all allowed uses under the PDD at the time of Master Plan submittal when more specific design are available, based upon ongoing project planning and market conditions. 2. Any such changes to exact location or product mix shall not be considered a material amendment hereto, or an amendment to the attached PDD or the Conceptual Master Plan, so long as the total allowed density is not exceeded and the use remains residential. Such minor changes will be approved at the staff review level. VIII. RESTRICTED ACCESS The Owner and/or each Developer shall have the right (but not the obligation) to create restricted access communities within the Property as long as such limited access does not adversely affect in any material respect adjacent traffic patterns located on public rights-of- way. IX. EFFECT OF FUTURE LAWS. Owner and Developers shall have vested rights to undertake Development of any or all of the Property in accordance with the Zoning Regulations, as defined herein and modified hereby, and as may be modified in the future pursuant to the terms of this Agreement for the entirety of the Term. Future enactments of, or changes or amendments to the County ordinances, including zoning or development standards ordinances, which conflict with the Zoning Regulations shall not apply to the Property unless the procedures and provisions of §6-31-80 (B) of the Act are followed, which Owner shall have the right to challenge. Notwithstanding the above, the Property will be subject to then current fire safety standards and state and/or federal environmental guidelines standards of general application. 9 The parties specifically acknowledge that this Agreement shall not prohibit the application of any present or future building, housing, electrical, plumbing, gas or other standard codes, or any ad valorem tax of general application throughout the County, found by the County Council to be necessary to protect the health, safety and welfare of the citizens of the County. X. INFRASTRUCTURE AND SERVICES The County and Owner recognize that the majority of the direct costs associated with the Development of the Property will be borne by the Owner and Developers, and many other necessary services will be provided by other governmental or quasi-governmental entities, and not by the County. For clarification, the parties make specific note of and acknowledge the following: A. Private Roads. All roads within the Property shall be constructed by the Owner, Developer or other parties and maintained by such party(ies) and/or Association(s) or dedicated for maintenance to other appropriate entities. The County will not be responsible for the construction or maintenance of any private roads within the Property. The CSP Development project shall have private roads designed to the standards reasonably acceptable to the County Engineer. Road construction within SCDOT right of ways will be in accordance with SCDOT standards. Roadway section details shall be submitted for review at the time of development permit applications, as provided in the PDD. B. Public Roads. All public roads outside the Property that serve the Property are under the jurisdiction of the State of South Carolina or other governmental entities regarding access, construction, improvements and maintenance. Owner acknowledges that it must comply with all applicable state statues and rules and regulations of the South Carolina Department of Transportation (“SCDOT”) or its successor regarding access and use of such public roads. Future public roads may serve the Property. The County shall not be responsible for construction, improvements or maintenance of the public roads which now or hereafter serve the Property, unless it otherwise agrees in the future. Owner has engaged Bihl Engineering, LLC, of Charleston, SC, to prepare a traffic impact analysis which has been submitted to the SCDOT for review and comment. Subject to the approval of SDOT and any other the applicable jurisdictional authorities, the Property is proposed to be served by direct access to the existing Brickyard Road and U.S. 10 Highway 278. Developer shall be responsible for construction of property access improvements as recommended by SCDOT after review of the SCDOT required traffic study. Upon completion of construction of any such improvements within the SCDOT right of way, and acceptance by SCDOT, the SCDOT shall then maintain all roadway improvements within the public road right of way. C. Potable Water. Potable water will be supplied to the Property by BJWSA or some other legally constituted public or private provider allowed to operate in the County. The County shall not be responsible for any construction, treatment, maintenance or costs associated with water service to the Property unless the County elects to provide such services with the agreement of the applicable utility authority then providing such service to the Property. Owner will construct or cause to be constructed all related infrastructure improvements within the Property, which will be maintained by it or the service provider as provided in any utility agreement between Owner and the service provider. D. Sewage Treatment and Disposal. Sewage treatment and disposal will be provided by BJWSA or some other legally constituted public or private provider allowed to operate in the County. The County will not be responsible for any treatment, maintenance or costs associated with sewage treatment within the Property, unless the County elects to provide such service with the agreement of the applicable utility authority then providing such service to the Property. Nothing herein shall be construed as precluding the County from providing sewer services to its residents in accordance with applicable provisions of law. Owner will construct or cause to be constructed all related infrastructure improvements within the Property, which will be maintained by it or the provider as provided in any utility agreement between Owner and the service provider. E. Use of Effl uent. Owner agrees that treated effluent will be disposed of only in such manner as may be approved by DHEC and the BJWSA. F. Police Services. County shall provide police protection services to the Property on the same basis as is provided to other similarly situated residents and businesses in the County. Owner acknowledges the jurisdiction the Sheriff of Jasper County on the Property and shall not interfere or in any way hinder public safety activities on the Property regardless of whether such may be a restricted access community. Should Owner desire an increased level of service above the normal County level of police service, Owner shall be responsible for either 11 providing such services through the use of private security forces or shall pay the County’s direct and indirect costs for providing such increased level of service. G. Fire Services. County shall provide fire protection services to the Property on the same basis as is provided to other similarly situated residents and businesses in the County. Owner acknowledges the jurisdiction of the County’s fire department on the Property and shall not interfere or in any way hinder public safety activities on the Property regardless of whether such may be a restricted access community. H. Sanitation Services. County will not provide sanitation services to any properties with the Property. Should Owner desire such services, the Owner shall provide these directly to the Property by a private licensed private contractor. I. Recreation Services. County shall provide recreation services to the Property on the same basis as it provides to other similarly situated residents and businesses in the County. J. Library Services. Such services shall be provided to residents on the same basis as to all other citizens of the County. K. Emergency Medical Services (EMS). Such services shall be provided to residents of the Property on the same basis as to all other citizens of the County. L. Drainage System. All stormwater runoff, treatment and drainage system improvements within the Property will be designed in accordance with the Zoning Regulations and Best Management Practices then current. All stormwater runoff, treatment and drainage system improvements for the Property shall be constructed by Owner or the Association, as applicable. The County will not be responsible for any construction or maintenance cost associated with the stormwater runoff, treatment and drainage system within the Property. M. Stor m Water Quality. Protection of the quality in nearby waters and wetlands is a primary goal of the County. The Owners shall be required to abide by all provisions of federal, state and local laws and regulations, including those established by the Department of Health and Environmental Control, the Office of Ocean and Coastal Resource Management, and their successors for the handling of storm water. In addition to the water quality safeguards as committed to by Owner above, notwithstanding Section IX hereof, Owner 12 and any developer shall adhere to any and all

Text truncated. Open the original for the full document.

Source: Jasper County website. First collected Nov 3, 2026.