06.03.2024 Agenda E Packet Full E Packet Cmpd
Jasper County · Jasper County · meeting of Jun 3, 2024 · Agenda packets
Open the original document More from Jasper County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Agenda 06.03.2024
Page 1
Watch Live via YouTube at:
https://www.youtube.com/channel/UCBmloqX05cKAsHm_ggXCJlA
Pursuant to Ordinance #08-17, Any citizen of the County may sign to
speak in person at the Council Meeting (before the Council Meeting’s
Regular Meeting start time) on the Public Comments Sign in Sheet on
the Podium to address Council on matters pertaining to County
Services and Operations. Presentations will be limited to three (3)
minutes per person and total public input will be limited to 30 minutes.
Written Public Comments may also be submitted by 1PM on the date
of the Council Meeting by emailing your comment to:
comments@jaspercountysc.gov.
To participate in a Public Hearing for a specific agenda item, you may
either email written public comments to
comments@jaspercountysc.gov by 1:00PM on Monday, June 3, 2024;
or you can speak in person at the Council Meeting by signing in on the
Public Hearing Sign In Sheet located outside the Council Chambers
Doors prior to the start of the meeting. Public Hearing Comments shall
be limited to 3 minutes per person.
Instructions may also be found at the Jasper County website
www.jaspercountysc.gov
FOR MORE INFORMATION, PLEASE CALL (843) 717-3696
Agenda 06.03.2024
Page 2
JASPER COUNTY COUNCIL
Jasper County Clementa C. Pinckney Government Bldg.
358 3rd Avenue, Ridgeland, SC 29936
Monday, June 3, 2024
4:00PM
Budget Workshop:
FIT – Families in Transition – Jennifer Coleman
Jasper Soil and Water Conservation District – Lyn Boyles
Jasper County Election Commission – Jeanine Bostick
Regular Council Meeting and Executive Session will begin at the conclusion of the Budget Workshop
1. Call to Order of Council Meeting by Chairman Sauls
Clerk’s Report of Compliance with the Freedom of Information Act.
*In compliance with the Freedom of Information Act, notice of meetings and agendas were posted
and furnished to all news media and persons requesting notification*
2. Executive Session SECTION 30-4-70.
(a) A public body may hold a meeting closed to the public for one or more of the following reasons:
(2) Discussion of negotiations incident to proposed contract arrangements and proposed
purchase or sale of property, the receipt of legal advice where the legal advice related to
pending, threatened, or potential claim or other matters covered by the attorney-client
privilege, settlement of legal claims, or the position of the public agency in other adversary
situations involving the assertion against the agency of a claim –Tax Map # 063-26-14-001
and # 063-26-14-002; Banking Matters; Nickel Plate MCIP; Exit 3; Emergency Services: Crowley
& Wechsler Agreement; Project Telfair
(5) Discussion of matters relating to the proposed location, expansion, or the provision
of services encouraging location or expansion of industries or other businesses in
the area served by a public body – Prospect Update
ANY EXECUTIVE SESSION MATTER ON WHICH DISCUSSION HAS NOT BEEN COMPLETED MAY HAVE
DISCUSSION SUSPENDED FOR PURPOSES OF BEGINNING THE OPEN SESSION AT ITS SCHEDULED TIME, AND
COUNCIL MAY RETURN TO EXECUTIVE SESSION DISCUSSION AFTER THE CONCLUSION OF THE OPEN SESSION
AGENDA ITEMS.
Agenda 06.03.2024
Page 3
PLEASE BE ADVISED THERE MAY BE VOTES BASED ON ITEMS FROM THE EXECUTIVE SESSION.
3: Return to Open Session at 6:30PM
o 3.1 Action coming out of Executive Session
4. Pledge of Allegiance and Invocation:
5. Approval of the Consent Agenda Items:
6. Approval of the Regular Agenda:
_______________________________________________________________________________________
PRESENTATIONS AND PROCLAMATIONS
_______________________________________________________________________________________
7. Proclamation for South Carolina Center for Father’s and Families proclaiming June the Joy of
Fatherhood Month in Jasper County.
8. Presentation by the Gullah & Latino Advisory Council.
______________________________________________________________________________________
RESOLUTIONS
_______________________________________________________________________________________
9. Mr. Fulghum - Consideration of Resolution #R-2024-18 To Adopt The Jasper County Equal Employment
Opportunity Plan.
______________________________________________________________________________________
PUBLIC HEARINGS, ORDINANCES AND ACTION ITEMS
10. Kim Burgess – Consideration of the 3rd reading and Public Hearing of Ordinance #O-2024-12
Authorising the Execution and Delivery of Certain Instruments Relating to the Acquisition, Construction,
Renovation, Equipping, Use, and Leasing of Certain County Facilities; Approving the Issuance of St. Peters
Parish/Jasper County Public Facilities Corporation Installment Purchase Revenue Bonds and Bond
Anticipation Notes; Consenting to the Form of Trust Agreements Between St. Peters Parish/Jasper
County Public Facilities Corporation and the Corporate Trustee; The Lease Of Certain Personal Property,
Real Property And The Buildings And Other Site Improvements Located Thereon, by Jasper County, South
Carolina to St. Peters Parish/Jasper County Public Facilities Corporation, Including Authorising the
Execution and Delivery of a Base Lease Agreement, Between Jasper County and St. Peters Parish/Jasper
County Public Facilities Corporation; Authorising the Execution and Delivery of a Public Facilities
Purchase and Occupancy Agreement Between Jasper County and St. Peters Parish/Jasper County Public
Facilities Corporation; Authorising the Execution and Delivery of a Lease Agreement Between Jasper
County and St. Peters Parish/Jasper County Public Facilities Corporation; and Other Matters Relating
Thereto. (1st reading 04.01.2024; 2nd reading 05.06.2024)
Agenda 06.03.2024
Page 4
11. David Tedder – Consideration of the 2nd reading and Public Hearing of Ordinance
#O-2024-14 authorizing the sale of a right of way easement over approximately 0.34 acres, 14,878
sq. ft., being a portion of TMS 042-00-05-040 adjacent to the Interstate Highway I-95, to the South
Carolina Department of Transportation in order to facilitate the widening, in exchange for the
amount of $20,900.00 in just compensation, and to authorize the Jasper County Administrator to
execute such right of way easement and other documents as may be necessary and appropriate to
effect the transfer to the South Carolina Department of Transportation, or its assigns, and matters
related thereto. (1st reading 04.01.2024) (I95 widening project).
12. Lisa Wagner – Consideration of the 2nd reading and Public Hearing and Consideration of Ordinance
#O-2024-15 to amend: (i) Ordinance Number O-2022-16 to adopt updated standards for the Planned
Development District encompassing a 38.84 acre parcel located on U.S. Highway 278 (the “Property”); and
(ii) Ordinance O-2022-14 to amend the development agreement (the “Development Agreement”) between
Jasper County (the “County”) and Conduit Street Partners, LLC (“CSP” or the “Developer”) that governs
CSP’s development of the Property into a 275 -unit single-family residential community (the “Project”); in
both cases to allow for the possibility that the Project may include not only “for rent” residential dwellings,
but also “for sale” residential dwellings; and matters related thereto. (1streading 05.06.2024)
CITIZEN COMMENTS
_______________________________________________________________________________________
13. Open Floor to the Public per Ordinance 08-17 Any citizen of the County may sign to speak in person at
the Council Meeting (before the Council Meeting’s 6:30PM start time on the Sign-In Sheet on the
Podium), to address Council on matters pertaining to County Services and Operations. Presentations will
be limited to three (3) minutes per person and total public input will be limited to 30 minutes.
_______________________________________________________________________________________
14. Administrator’s Report
CONSENT AGENDA
_______________________________________________________________________________________
15. Kimberly Burgess - Consideration of the 3rd reading of Ordinance #O-2024-13 To Provide For The Levy
Of Tax For Public Purposes In Jasper County For The Fiscal Year Beginning July 1st, 2024 And Ending June
30th 2025 And To Make Appropriations For Said Purposes; To Adopt And Approve The Jasper County
Capital And Operations Budget For Fiscal Year 2024-2025, To Adopt And Approve The Jasper County School
District Capital And Operations Budget For Fiscal Year 2024–2025; To Provide For The Levy Of Taxation For
Fiscal Year 2024 –2025; To Limit The Disbursements By The County Treasurer To Those Appropriated By
Law; To Provide That Expenditures Not Exceed Appropriations; To Authorize Tax Anticipation Notes; To
Make Authorization Of Certain Transfers; To Provide For Additional Appropriations And Borrowing; To
Codify Jasper County Rates And Fees; To Provide For Lapsin g Funds And Continuing Appropriations For
Subsequent Years; To Require Certain Agencies And Departments To File Accountings; To Require The
Treasurer To Sign General Fund Checks; To Provide Special Rules For Travel And Training Disbursements;
Agenda 06.03.2024
Page 5
To Provide For Travel Reimbursements; To Provide Compliance With Act No. 317 Of 1990; To Provide
Certain Benefits To Council Members; To Provide For County Commission And Committee Stipends; To
Provide For Jury Mileage; To Adopt Property Values; And To Pro vide For Effective Date Of This Ordinance
(1st reading 05.06.2024; 2nd reading and Public Hearing 05.20.2024)
16. Kimberly Burgess – Bid Acceptance Recommendation for a Container and Compactor Bid for the
purchase of four (4) containers and one compactor for use at the solid waste collection centers and to
authorize the County Administrator or his designee to execute all documents necessary to complete the
purchase.
17. Danny Lucas – Consideration of the 2024 CDBG Ranking Summary
18. Kimberly Burgess – Bid Acceptance Recommendation for Debris Removal at the Coosawhatchie
Community Center site
19. Kimberly Burgess – Proposal Acceptance Recommendation for Financial and Compliance Auditing
Services
20. Andrew Fulghum - Acceptance of Body Armor Assistance Grant No. 1BA24008 award from the SC
Department of Public Safety.
21. Kimberly Burgess - Acceptance and authorization of M. B. Kahn Construction Co., Inc. Capital Planning
Services Extension
22. Approval of the Minutes 04.01.2024
_______________________________________________________________________________________
END OF CONSENT AGENDA
_______________________________________________________________________________________
23. Council Members Comments:
24. Possible Return to Executive Session to Continue Discussion on Matters Regarding Agenda
Item II. *Council may act on any item appearing on the agenda including items discussed in executive
session.
25. Adjournment:
In accordance with South Carolina Code of Laws, 1976, Section 30-4-80(d), as amended, notification of the
meeting was posted on the County Council Building at a publicly accessible place and on the county website
at least 24 hours prior to the meeting. A copy of the agenda was given to the local news media and posted
at the meeting location twenty-four hours prior to the meeting.
Special Accommodations Available Upon Request to Individuals with Disabilities
(843) 717-3696
FIT – Families in Transition –
Jennifer Coleman
Jasper Soil and Water Conservation District–
Lyn Boyles
Jasper County Election Commission –
Jeanine Bostick
1
2024 – 2025 Board of Elections Proposed Budget Explanations
1. 2008 - Cost of Living Adjustment: +$10,400.00
2024 - 2025 Proposed Budget Amount: $536,250.00
2023- 2024 Adopted Budget Amount: $473,750.00
Increase Of: +$ 62,500.00
NOTE: Revenue from City of Hardeeville and Town of Ridgeland Elections $4,400 each.
Motioned to approve by Ms. Carrie Fair, seconded by Mrs. Hilda Stevenson-Stewart. Motion carried
unanimously. March 14, 2024, at the monthly board meeting.
2
2024 - 2025 JASPER COUNTY BOARD OF ELECTION & VOTERS REGISTRATION PROPOSED BUDGET REQUEST
ACCOUNT ACCOUNT DESCRIPTION 2023 - 2024 ADOPTED BUDGET 2024-2025 PROPOSED BUDGET
2000 SALARIES & WAGES $127,250.00 $132,250.00 (3% Cost of Living for Admin Asst; Deputy Director & Director’s Salary)
2001 PART-TIME SALARIES $60,000.00 $ 60,000.00 (Poll Workers)
2008 COST OF LIVING ADJUSTMENT $9,400.00 $10,400.00
2020 OVERTIME $0.00 $0.00
2030 FICA—EMPLOYER CONTRIB. $9,700.00 $9,700.00 FINANCE DEPARTMENT COMPUTES FIGURES
2036 S.C. RERETIREMENT-EMPLOYER $23,400.00 $23,400.00 FINANCE DEPARTMENT COMPUTES FIGURES
2040 MEDICAL INSURANCE $26,500.00 $26,500.00 FINANCE DEPARTMENT COMPUTES FIGURES
2050 TORT INSURANCE $18,000.00 $18,000.00 FINANCE DEPARTMENT COMPUTES FIGURES
2060 WORKER’S COMPENSATION $2,600 $ 2,600.00 FINANCE DEPARTMENT COMPUTES FIGURES
2100 TELEPHONE $4,000.00 $ 4,000.00 FINANCE DEPARTMENT COMPUTES FIGURES
2200 OFFICE SUPPLIES $4,400.00 $ 4,400.00 FINANCE DEPARTMENT COMPUTES FIGURES
2300 GAS, OIL & GREASE $1,400.00 $1,400 PER FINANCE DEPARTMENT COMPUTES FIGURES
2307 NEW VEHICLES $0.00 $55,000.00 Purchase Vehicle to Transport Voting Equipment, ie.,
Voter Registration Drives and Poll Workers Training
2310 VEHICLE INSURANCE $0.00 $1,500.00 FINANCE DEPARTMENT COMPUTES FIGURES
2320 VEHICLE MAINTENANCE $1,400.00 $1,400.00 FINANCE DEPARTMENT COMPUTES FIGURES
2400 MAINTENANCE CONTRACTS $80,000.00
$80,000.00- Copiers and Printers; ES& S Voting Equipment; Preventive
Maintenance; Hardware & Software Contract.
2440 OFFICE EQUIPMENT $10,000.00 $10,000.00 (Additional Voting Equipment for New Precinct
Margaritaville)
2610 TRAVEL & TRAINING $30,000.00 $30,000.00 - SCARE Conference - SCARE Conference Fees; Dues;
Mandatory Certification and Continued Education Trainings; District
Meetings and Workshops; Hotel Accommodations; Mileage & Meal
Expenses
2825 UTILITIES $5,000.00 $ 5,000.00 FINANCE DEPARTMENT COMPUTES FIGURES
2850
ELECTION EXPENSES $35,000.00 $35,000.00 - Town of Ridgeland Election; (to include but not limited;
Election supplies; delivery of voting equipment; vehicle leasing f ees;
custodian fees; COVID-19 precinct cleaning expenses; voter registration
drives, poll workers training
2870 MEDIA SERVICES $5,000.00 $5,000.00
3200 VORTERS REGISTR-BOARD MEMBERS $20,700.00 $20,700.00
TOTAL $473,750.00 $536,250.00
3
PROCLAMATION
Jasper County Proclamation for Fatherhood
WHEREAS, fathers are the cornerstone of strong families, providing love, guidance,
and support to their children; and
WHEREAS, the positive impact of fathers on their children’s development cannot be
overstated, as they instill values, encourage growth, and foster resilience; and
WHEREAS, the South Carolina Center for Fathers and Families, established in 2002,
has been a beacon of support, equipping tens of thousands of fathers across our state
with the resources and knowledge needed to embrace responsible fatherhood; and
WHEREAS, the long public-private partnership between the Center and state, local,
and private agencies, has led to the Center’s expansion and innovation of programs to
serve more dads better; and
WHEREAS, the Center has developed and expanded the reach of its network of five
regional fatherhood organizations, including A Father’s Place, Man 2 Man, Midlands
Fatherhood Coalition, A Father’s Way, and Upstate Fatherhood Coalition; and
WHEREAS, when fathers actively lead and engage with their children, these young
lives flourish socially, emotionally, and academically; and
WHEREAS, the Center continues to serve as a model for fatherhood initiatives
nationwide; and
WHEREAS, the month of June provides an opportunity for all citizens of South
Carolina to celebrate and honor the joys of fatherhood, recognizing the tireless efforts of
fathers in shaping the future of our communities; and
NOW, THEREFORE, BE IT RESOLVED, that Jasper County Council of the great
State of South Carolina do hereby proclaim the month of June 2024 as
The Joy of Fatherhood Month
throughout our county and encourage all our residents to express gratitude for the
fathers in their lives, celebrate their contributions, and to promote the active
involvement of fathers in children's lives to enhance the lives of our young people, build
better citizens, and strengthen South Carolina families and communities.
Dated this 3rd day of June 2024.
County Council of Jasper County, SC
____________________________________
(Seal) Chairman, Jasper County Council
1
STATE OF SOUTH CAROLINA
JASPER COUNTY
RESOLUTION NUMBER # R-2024 -18
RESO
LUTION OF JASPER COUNTY COUNCIL
A RESOLUTION TO ADOPT THE JASPER COUNTY
EQUAL EMPLOYMENT OPPORTUNITY PLAN
WHEREAS, Jasper County , South Carolina has developed a policy to promote
the specific goals and objectives for ensuring equal opportunities within the
Coun
ty; and
WHEREAS, such a policy has been created in conformance with the guidelines
established by the federal government utilizing the most recent data available;
and
WHEREAS, it is the continuing policy of the Jasper County Council to afford
equal employment opportunities to qualified individuals regardless of sex, race,
creed, disability, or national origin, and to conform to the applicable law and
regulations; and
WHEREAS, equal opportunity encompasses all aspects of employment
practices to include, but no limited to, recruiting, hiring, training, compensation ,
benefits, promotions, transfers, recalls from layoffs, discipline, and department
sponsored educational and social and recreational programs; and
WHEREAS, it is the policy of Jasper County to provide its employees a viable
means for communicating and resolving grievances and complaints regarding
unlawful discriminatory employment practices , and any employee of Jasper
County who fails to comply with this policy is subject to disciplinary action;
NOW THEREFORE, BE IT RESOLVED by the Jasper County Council, in
Council duly assembled and by the authority of the same , that Jasper County
2
Council hereby adopts and enacts the attached Jasper County Equal Employment
Opportunity Plan; and
AND BE IT FURTHER RESOLVED, that all previously adopted or approved
Equal Employment Opportunity Plans are her eby repealed and replaced with the
Jasper County Equal Employment Opportunity Plan adopted herein.
ADOPTED THIS THE 3rd DAY OF JUNE 2024.
SIGNATURES FOLLOW
This Resolution No. R-2024-18 made this 3rd day of June, 2024.
______________
_______
L. Martin Sauls, IV
Chairman
ATTEST:
_____________________
Wanda H. Giles
Clerk to Council
Revie
wed for form and draftsmanship by the Jasper County Attorney.
________
___________________ _____________
David L. Tedder Date
EQUAL EMPLOYMENT OPPORTUNITY PLAN
ADOPTED JUNE 3, 2024
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
i
-- Place holder for a resolution --
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
ii
TABLE OF CONTENTS
EXECUTIVE SUMMARY ................................ ................................ ................................ ................................ V
SECTION I ................................ ................................ ................................ ................................ ................... 1
EEOP Purpose ...................................................................................................................................................... 1
EEO Policy Statement .......................................................................................................................................... 2
Diversity, Equity, and Inclusion Policy ................................................................................................................. 3
SECTION II ................................ ................................ ................................ ................................ .................. 4
Demographics ..................................................................................................................................................... 4
Utilization Analysis .............................................................................................................................................. 5
SECTION III ................................ ................................ ................................ ................................ ................. 8
Objectives ............................................................................................................................................................ 8
Implementation................................................................................................................................................... 9
SECTION IV ................................ ................................ ................................ ................................ ................ 12
Appendix A: Demographics ............................................................................................................................... 12
Appendix B: Workforce Analysis ....................................................................................................................... 15
Appendix C: Definitions of Race/Ethnicity Categories ...................................................................................... 40
Appendix D: Description of Job Categories ....................................................................................................... 41
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
iii
LIST OF TABLES
Table 1: Population Change 2000-2020 ................................................................................................................ 12
Table 2: Race and Ethnicity 2000-2020 ................................................................................................................. 12
Table 3: Age Distribution 2000-2020 .................................................................................................................... 13
Table 4: Household Formation 2000-2020 ........................................................................................................... 13
Table 5: Educational Attainment 2000-2020 ........................................................................................................ 14
Table 6: Income 2000-2020 ................................................................................................................................... 14
Table 7: Workforce Utilization Analysis 2021 ....................................................................................................... 25
Table 8: Significant Workforce Underutilization 2021 .......................................................................................... 27
Table 9: Workforce Utilization Analysis between 2011 and 2021 ........................................................................ 37
Table 10: Significant Improvement of Workforce Utilization between 2011 and 2021 ....................................... 39
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
iv
LIST OF FIGURES
Figure 1: Workforce for All Job Categories by Sex in 2021 ................................................................................... 15
Figure 2: Male Workforce by Job Category in 2021 .............................................................................................. 16
Figure 3: Female Workforce by Job Category in 2021 .......................................................................................... 17
Figure 4: Workforce for All Job Categories by Race and Ethnicity in 2021 ........................................................... 18
Figure 5: White Workforce by Job Category in 2021 ............................................................................................ 19
Figure 6: Black or African American Workforce by Job Category in 2021 ............................................................ 20
Figure 7: American Indian or Alaska Native Workforce by Job Category in 2021 ................................................ 21
Figure 8: Asian Workforce by Job Category in 2021 ............................................................................................. 22
Figure 9: Native Hawaiian or Other Pacific Islander Workforce by Job Category for in 2021 .............................. 23
Figure 10: Hispanic or Latino Workforce by Job Category in 2021 ....................................................................... 24
Figure 11: Workforce for All Job Categories by Sex between 2011 and 2021 ...................................................... 28
Figure 12: Male Workforce by Job Category between 2011 and 2021................................................................. 29
Figure 13: Female Workforce by Job Category between 2011 and 2021 ............................................................. 30
Figure 14: Workforce for All Job Categories by Race and Ethnicity between 2011 and 2021 .............................. 31
Figure 15: White Workforce by Job Category between 2011 and 2021 ............................................................... 32
Figure 16: Black or African American Workforce by Job Category between 2011 and 2021 ............................... 33
Figure 17: American Indian or Alaska Native Workforce by Job Category between 2011 and 2021 ................... 34
Figure 18: Asian or Native Hawaiian or Other Pacific Islander Workforce by Job Category between 2011 and
2021 ...................................................................................................................................................... 35
Figure 19: Hispanic or Latino Workforce by Job Category between 2011 and 2021 ............................................ 36
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
v
EXECUTIVE SUMMARY
Jasper County is committed to ensuring that equal employment opportunity in the workplace is mandatory.
The Equal Employment Opportunity Plan (EEOP) has been updated to reiterate the County’s commitment to a
diverse workforce through employment, career development opportunities, and promotion of an inclusive
workforce; and provide a work environment that prohibits discrimination based on sex, race, color, religion,
national origin, disability, age, sexual orientation, pregnancy, socio-economic, or marital status.
The EEOP includes information on the importance of equal employment opportunities in the workplace,
demographics and trends, workforce utilization analysis, and key objectives for ensuring equal employment
opportunities at all levels.
A comparison of county workforce and available workforce indicates underutilization of women and minorities
in several categories i.e., Officials/Administrators, Professionals, Technicians, and Protective Services. In
addition, a comparison of county workforce between 2011 and 2021 shows significant improvements in the
recruitment and retention of women and minorities in the Officials/Administrators, Professionals, Skill Craft,
and Service/Maintenance categories. The County has analyzed this information to determine whether and
where underutilization of workforce exists. The County will address any areas of underutilization and will
prioritize available recruitment and promotional opportunities.
Promoting diversity and inclusion at all levels of the workforce shall not be exercised through quotas, but
rather through merits. Jasper County recognizes that an effective and efficient government requires a
workforce with knowledge, skills, and abilities that are necessary for essential job functions to support the
County’s services.
Key objectives have been developed to guide and measure progress towards achieving equal employment
opportunities. The three key objectives are:
• Compliance with policies and regulations
• Increased communication, outreach, and diversity
• Diversity, equity, and inclusion training
Jasper County, with support of the Equal Employment Opportunity Committee, the Human Resources
Department, Department Heads, and employees, will implement these objectives and pursue solutions to
problems that might impede the progress of this plan.
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
1
SECTION I
EEOP PURPOSE
An Equal Employment Opportunity Plan (EEOP) is a comprehensive document that analyzes the organization’s
relevant labor market data, as well as the organization’s employment practices, to identify possible barriers to
the participation of all groups of people, specifically addressing the level of participation of minorities and
women in the organization’s workforce. The EEOP purpose is to ensure the opportunity for full and equal
participation of men and women in the workplace, regardless of race, color, or national origin.
The EEOP is required by a federal regulation to implement the provision prohibiting employment
discrimination. According to the U.S. Equal Employment Opportunity Commission, federal equal employment
laws for local governments include:
Race, Color, Religion, Sex, National Origin
Title VII of the Civil Right Act of 1964, as amended, protects applicants and employees from discrimination in
hiring, promotion, discharge, pay, fringe benefits, job training, classification, referral, and other aspects of
employment, on the basis of race, color, religion, sex (including pregnancy), or national origin. Religious
discrimination includes failing to reasonably accommodate an employee’s religious practices where the
accommodation does not impose undue hardship.
Disability
Americans with Disabilities Act of 1990, as amended, protect qualified individuals from discrimination on the
basis of disability in hiring, promotion, discharge, pay, fringe benefits, job training, classification, referral, and
other aspects of employment. Disability discrimination includes not making reasonable accommodation to the
known physical or mental limitations of an otherwise qualified individual with a disability who is an applicant
or employee, barring undue hardship.
COUNTY MISSION: TO PROVIDE EFFICIENT GOVERNMENT SERVICES
AND MANAGE GROWTH WHILE PROTECTING JASPER COUNTY’S RICH
ENVIRONMENTAL HERITAGE AND QUALITY OF LIFE.
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
2
Age
Age Discrimination in Employment Act (ADEA) of 1967, as amended, protects applicants and employees 40
years of age or older from discrimination based on age in hiring, promotion, discharge, pay, fringe benefits, job
training, classification, referral, and other aspects of employment.
Sex (Wages)
The Equal Pay Act of 1963, as amended, prohibits sex discrimination in the payment of wages to women and
men performing substantially equal work, in jobs that require equal skill, effort, and responsibility, under
similar working conditions, in the same establishment.
Genetics
Title II of the Genetic Information Nondiscrimination Act of 2008 (GINA), protects applicants and employees
from discrimination based on genetic information in hiring, promotion, discharge, pay, fringe benefits, job
training, classification, referral, and other aspects of employment. GINA also restricts employers’ acquisition of
genetic information and strictly limits disclosure of genetic information. Genetic information includes
information about genetic tests of applicants, employees, or their family members; the manifestation of
diseases or disorders in family members (family medical history); and requests for or receipt of genetic services
by applicants, employees, or their family members.
EEO POLICY STATEMENT
It is the policy of Jasper County to provide fair and equal employment opportunity to all qualified men and
women within its workforce and to prohibit discrimination in employment on the basis of race, color, religion,
sex, national origin, disability, age, sexual orientation, pregnancy, socio-economic, or marital status. The
County is committed to ensuring an inclusive, diverse workforce that is reflective of the community it serves.
This Equal Employment Opportunity Plan provides the foundation of the community it serves. The County’s
fair and equal employment opportunity policy includes, but is not limited to:
• Nondiscriminatory recruitment, screening, testing, hiring, training, promoting of persons in all job
categories.
• Employment decisions that are based on Jasper County’s commitment to equal employment opportunity.
• Ensuring that promotion decisions are in accordance with the principles of equal employment
opportunity by imposing only valid requirements for promotional opportunity.
• Ensuring that all personnel actions such as compensation, benefits, transfers, work assignments,
layoffs, return from layoff, disciplinary actions, terminations, training, and education are administered
in a fair and nondiscriminatory manner.
• Ensuring affirmative steps are taken to correct under-representation of any protected group within the
County’s workforce.
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
3
DIVERSITY, EQUITY, AND INCLUSION POLICY
Jasper County is committed to fostering, cultivating, and preserving a culture of diversity, equity and inclusion.
Our human capital is the most valuable asset we have. The collective sum of the individual differences, life
experiences, knowledge, inventiveness, innovation, self-expression, unique capabilities and talent that our
employees invest in their work represents a significant part of not only our culture, but our reputation and
company’s achievement as well.
We embrace and encourage our employee’s differences in age, color, disability, ethnicity, family or marital
status, gender identity or expression, language, national origin, physical and mental ability, political affiliation,
race, religion, sexual orientation, socio-economic status, veteran status, and other characteristics that make
our employees unique.
Jasper County’s diversity initiatives are applicable, but are not limited, to our practices and policies on
recruitment and selection, compensation and benefits, professional development and training, promotions,
transfers, social and recreational programs, layoffs, terminations, and the ongoing development of a work
environment built on the premise of diversity, equity, and inclusion that encourages and enforces.
• Respectful communication and cooperation between all employees.
• Teamwork and employee participation, permitting the representation of all groups and employee
perspectives.
• Work/life balance through flexible work schedules to accommodate employees’ varying needs.
• Employer and employee contributions to the communities we serve to promote a greater
understanding and respect for diversity.
All employees of Jasper County have a responsibility to treat others with dignity and respect at all times. All
employees are expected to exhibit conduct that reflects inclusion during work, at work functions on or off the
work site, and at all other county-sponsored and participative events. All employees are also required to
attend and complete annual diversity awareness training to enhance their knowledge to fulfill this
responsibility.
Any employees found to have exhibited any inappropriate conduct or behavior against others may be subject
to disciplinary action. Employees who believe they have been subjected to any kind of discrimination that
conflicts with the county’s diversity policy and initiatives should seek assistance from a supervisor or an HR
representative.
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
4
SECTION II
DEMOGRAPHICS
Jasper County comprises the City of Hardeeville, the Town of Ridgeland, and unincorporated areas. According
to Census Bureau’s urban-rural classification, 14% of the County’s areas are classified as urban in 2020.
According to Census Decennial, the County’s population increased by 39.2% from 20,678 in 2000 to 28,363 in
2020, with the strongest growth in the southern portions of the County. These figures include a large increase
from 1,793 to 7,228 (316.8%) in the City of Hardeeville. The County’s population is expected to increase by
64.6% by 2035 to exceed 34,000. In 2020, the County’s population density stood at 43.9 persons per square
mile.
Historically the County’s population was almost entirely composed of Blacks and Whites, with relatively small
numbers of Asians, Native Americans, Pacific Islanders, and Hispanics. Between 2000 and 2020, there have
been significant changes in the population’s composition, with an increase of Hispanics by 326.8%. In 2020, the
racial mixture is 45.3% Whites, 33.2% Blacks, 21.5% other races. The ethnic population comprises Hispanics
(17.6%). The Hispanic population continued to grow in the County.
The age composition is an important factor in determining the workforce available in the County. The County’s
median age is 42.5 in 2020. The number of working age population (15-64) has increased but at a slow rate.
This may suggest a shrinking future labor force. The County also saw a marked increase in population 60 years
and older at 183.8% from 2000 to 2020. The population 60 years and older comprises approximately three in
ten people.
In 2020, a total of 11,272 households resided in the County, with a 60.5% increase from 2000. The average
household size of 2.71 persons in the County is slightly larger than that of the Lowcountry region (2.56) and the
state (2.53). The majority of households (46.9%) are married couples. There are more female-headed
households (29.2%) compared to male-headed households (17.9%). Among single-person households, 40.8%
are people aged 65 or older.
The educational attainment of the County’s population can influence economic development, earning
potential, and quality of life. Between 2000 and 2020, the County saw an increase of population 25 years and
older that holds a high school diploma (65.7%) or a higher education degree (some college or associate’s
degree 117.9%, bachelor’s degree 291.2%, and graduate degree 292.3%). Presumably, the high percentage in
higher education compensates for the low percentage of the population with a high school diploma.
In 2020, the County’s median household income is $45,924, below the averages for the region ($48,070) and
the state ($54,864). Between 2000 and 2020, median income had increased by 49.5%, however inflation-
adjusted median incomes had declined by 0.1%. Further details on demographics can be found in Appendix A.
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
5
UTILIZATION ANALYSIS
A utilization analysis is a workforce analysis made to ensure that Jasper County provides equal employment
opportunities to women and minorities. A utilization analysis compares the County’s workforce to the relevant
labor market in terms of sex, race and ethnicity, and job category. In addition, this section provides a
comparison of County workforce between 2011 and 2021 to reflect changes in workforce overtime. Further
details on comparison of County workforce to available workforce and comparison of County workforce
between 2011 and 2021 can be found in Appendix B. Definitions of race and ethnicity and description of job
category can be found in Appendix C and Appendix D respectively.
The results of the analyses will help determine if there is underutilization in the County government and how
to develop goals and engage in targeted outreach and recruitment activities to help meet Equal Employment
Opportunity requirements.
Comparison of County Workforce to Available Workforce
Workforce by Sex
The County’s workforce is predominantly male, while the available workforce is predominantly female. Males
comprise 53% of the County’s workforce and 47.5% of the available workforce. Females comprise 47% of the
County’s workforce and 52.5% of the available workforce. The County’s female workforce is under-
represented by 5.5%.
Workforce by Race and Ethnicity
The County’s workforce and available workforce are predominantly White. The County’s racial/ethnic
workforce exceeds available workforce in Whites by 3%, Blacks by 3.2%, and American Indian or Alaska Natives
by 0.6%. The County’s racial/ethnic workforce is under-represented in Asians by 0.7%, Hispanics by 5.5%, and
Others by 0.8%.
Workforce by Job Category
• Officials/Administrators
- There was an under-representation of White males by 24.2%, White females by 17.5%, and
Hispanic males by 2.4%.
- Hispanics females were not represented at all, with an under-representation by 2.4%.
• Professionals
- There was an under-representation of Whites females by 31.3%.
- Asian males, Asian females, and Hispanic males were not represented at all, with an under-
representation by 3%, 3.5%, and 1% respectively.
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
6
• Technicians
- Black males and Hispanic males were not represented at all, with an under-representation by
13.5% and 11.7% respectively.
• Protective Services
- Black males were under-represented by 24.4%.
• Administrative Support
- There was an under-representation of White males by 9.1%, Black males by 0.5%, and Black
females by 1.4%.
- Asian males, Native Hawaiian or Other Pacific Islander males, and Hispanic males were not
represented at all, with an under-representation by 1.1%, 0.2%, and by 0.6% respectively.
• Skilled Craft
- There was an under-representation of White males by 4.5%.
- Hispanic males were not represented at all, with an under-representation by 30.1%.
• Service/Maintenance
- There was an under-representation of White males by 4.9% and Black females by 11.7%. Hispanic
males and females were not represented at all, with an under-representation by 5.8% and 4.2%
respectively.
Comparison of County Workforce between 2011 and 2021
Workforce by Sex
A comparison of the County’s workforce between 2011 and 2021 reflects the predominance of male employees.
However, the County saw an increase of females in the workforce from 41.9% in 2011 to 47% in 2021.
Workforce by race and Ethnicity
A comparison of the County’s workforce between 2011 and 2021 reflects the predominance of Whites with
roughly unchanged representation from 57.3% in 2011 to 57.5% in 2021. The County saw an increase of Blacks
in the workforce from 41.9% in 2011 to 47% in 2021. For the same period, the representation of other races
and ethnicities decreased: American Indians and Alaska Natives (0% to 0.6%), Asians or Native Hawaiians or
Other Pacific Islanders (0.3% to 0.6%), and Hispanics (0.7% to 3.2%).
Workforce by Job Category
• Officials/Administrators
- Increase in representation: Black males by 16.7%, Black females by 15%, and American Indian or
Alaska Native females by 2.5%.
- Decrease in representation: White males by 28.3%, White females by 4.2%, and Asian or Native
Hawaiian or Other Pacific Islander females by 1.7%.
- No representation at all: American Indian or Alaska Native males, Asian or Native Hawaiian or
Other Pacific Islander males, Hispanic males, and Hispanic females.
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
7
• Professionals
- Increase in representation: Black males by 9.1%, Asian or Native Hawaiian or Other Pacific Islander
males by 3.1%, White females by 1.6%, Black females by 2.5%, American Indian or Alaska Native
females by 3.1%.
- Decrease in representation: White males by 19.3%.
- No representation at all: American Indian or Alaska Native males, Hispanic males, Asian or Native
Hawaiian or Other Pacific Islander females, and Hispanic females.
• Technicians
- Increase in representation: White males by 40%.
- Decrease in representation: Black males by 20% and Hispanic males by 20%
- No representation at all: American Indian or Alaska Native males, Asian or Native Hawaiian or
Other Pacific Islander males, Hispanic males, American Indian or Alaska Native females, Asian or
Native Hawaiian or Other Pacific Islander females, and Hispanic females.
• Protective Services
- Increase in representation: White males by 25.4%, White females by 3.3%, and Hispanic females
by 0.7%
- Decrease in representation: Black males by 24.5%, Hispanic males by 0.8%, and Black females by
4.1%
- No representation at all: American Indian or Alaska Native males, Asian or Native Hawaiian or
Other Pacific Islander males, American Indian or Alaska Native females, and Asian or Native
Hawaiian or Other pacific Islander females.
• Administrative Support
- Increase in representation: White males by 2.3%, Black males by 2.3%, Black females by 6.2%, and
Hispanic females by 9.2%.
- Decrease in representation: White females by 20%.
- No representation at all: American Indian or Alaska Native males, Asian or native Hawaiian or
Other Pacific Islander males, Hispanic males, American Indian or Alaska Native females, and Asian
or Native Hawaiian or Other Pacific Islander females.
• Skilled Craft
- Increase in representation: White males by 20.5% and White females by 23.7%.
- Decrease in representation: Black males by 34.5% and Black females 9.8%.
- No representation at all: American Indian or Alaska Native males, Asian or Native Hawaiian or
Other Pacific Islander males, Hispanic males, American Indian or Alaska Native females, Asian or
Native Hawaiian or Other Pacific Islander females, and Hispanic females.
• Service/Maintenance
- Increase in representation: White males by 16.7%, Black males by 54.2%, White females by 20.8%,
Black females by 8.3%
- Decrease in representation: None because there was no workforce utilization in 2011.
- No representation at all: American Indian or Alaska Native males, Asian or Native Hawaiian or
Other Pacific Islander males, Hispanic males, American Indian or Alaska Native females, Asian or
Native Hawaiian or Other Pacific Islander females, and Hispanic females.
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
8
SECTION III
As the 8th largest employer in the County with approximately 350 employees, Jasper County is committed to
the principle that equal employment opportunity must be affordable to all persons, regardless of race,
ethnicity, creed, color, sex, sexual orientation, gender identity or expression, national origin or ancestry,
marital or familial status, pregnancy, veteran status, religious belief or non-belief, age, disability or any other
legally protected class under federal or state law. No person shall suffer discrimination with respect to
employment or other terms or conditions of employment by reason of such person’s status as enumerated
above.
Jasper County administration reflects the people it serves. The following provides the County’s key objectives
for ensuring equal employment opportunities at all levels.
OBJECTIVES
Compliance with Policies and Regulations
• To evaluate the County’s personnel activities and management to ensure compliance with federal and
state employment regulations.
• To align with the goals of the Diversity, Equity, and Inclusion Policy.
• To administer all personnel actions in a non-discriminatory manner as stated within the Equal
Employment Opportunity Plan.
Increased Communication, Outreach, and Diversity
• To clearly communicate with all elected officials, department heads, employees, applicants, and the
public about the EEO information on a regular basis throughout the year with educational information
and policy reminders.
• To expand the pool of diverse and under-represented applicants based on assessments, reviews, and
data. In addition, to participate in various community events to build partnerships with diverse
community organizations.
• To increase employment opportunities and equal participation of all qualified persons by eliminating
non-job related factors, conditions, and requirements from any job vacancies.
• To identify and remove any artificial, arbitrary, or unnecessary barriers to employment which operate
to discriminate on the basis of race, ethnicity, creed, color, sex, sexual orientation, gender identity or
expression, national origin or ancestry, marital or familial status, pregnancy, veteran status, religious
belief or non- belief, age, disability or any other legally protected class under federal and state law.
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
9
Diversity, Equity, and Inclusion Training
• To provide training regarding County policies that promote diversity, equity, and inclusion to foster
positive intergroup relationships and a welcoming environment for all employees.
• To provide training regarding workplace discrimination, harassment, retaliation, and inclusion, to
ensure equal employment opportunities for all employees.
IMPLEMENTATION
Jasper County recognizes that equal employment opportunity may be ensured only by a carefully administered
and practiced program designed to eliminate any practices, standards or conditions tending to result in
discrimination. Additionally, by initiating positive efforts in recruitment, examination, selection, promotion,
and training procedures, the County seeks to extend equal employment opportunities to all qualified persons
without limiting, segregating, or classifying employees and applicants for employment in any way which would
deprive any individual of employment opportunities or otherwise affect his or her status as an employee. An
individual’s race, natural hair or hairstyles, ethnicity, creed, color, sex, sexual orientation, gender identity or
expression, national origin or ancestry, marital or familial status, pregnancy, veteran status, religious belief or
non-belief, age, disability or any other legally protected class under federal or state law shall not be
considerations when extending employment opportunities.
The County’s commitment to equal employment opportunity requires the support of County leadership, the
Human Resources Department, department heads, and all employees as set forth in the following:
Equal Employment Opportunity Committee
• Comprising representatives from County Departments and citizens.
• Encouraging and communicating EEO and diversity, equity, and inclusion policies and initiatives so that
the County can better support the diverse workforce.
• Reviewing statistical data of the County’s demographics and workforce for the purpose of evaluating
the effectiveness of the County’s equal employment opportunity.
• Liaising with Human Resources, Department heads, and employees to identify EEO problem areas and
to recommend solutions.
County Administrator
• Providing executive leadership and oversight to ensure that department heads act as necessary to
achieve and implement the EEO objectives as well as diversity, equity and inclusion.
• Reiterating the County’s commitment to equal employment opportunities and a diverse and inclusive
workforce at all levels through leadership support, policies and guidance, resources, and budgetary
assistance.
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
10
Human Resources Department
• Complying with applicable laws and regulations, reviewing personnel policies, employment practices
and procedures, and making improvements or recommendations on steps to promote equal
employment opportunity and diversity, equity and inclusion.
• Conducting ongoing statistical analysis of the County’s workforce and taking steps to remedy
underutilization to promote full participation and diversity at all levels of employment.
• Developing and disseminating an EEO’s communication plan and materials to ensure that all
departments and staff are aware, understand, and work within federal and state law, as well as County
policies and procedures. The dissemination includes hard copy in areas highly visible to employees, the
county web page for viewing and printing, and the county employee handbook.
• Increasing countywide recruitment efforts to attract a broad and diverse candidate pool for positions
in all categories, particularly for under-represented groups, to maintain a workforce reflective of the
community it serves. Advertising for job openings with the statement:
“We are an equal opportunity employer, and all qualified applicants will receive
consideration for employment without regard to race, color, religion, sex, sexual
orientation, gender identity or expression, pregnancy, age, national origin, disability
status, genetic information, protected veteran status, or any other characteristic
protected by law.”
Department Heads
• Achieving progress towards equal employment practices by reviewing its department’s utilization of
minorities, females, and disabled persons, determining barriers that may hinder their efforts for
creating a diverse workforce, and working with the Human Resources Department to make
improvement in those areas.
• Creating and fostering work environments free of discrimination and taking prompt action when an
employee, workforce member, or non-employee has been found engaging in discrimination,
retaliation, or harassment (including sexual harassment) while conducting business on behalf of the
County.
• Encouraging department employees to notify or report all incidents of discrimination, retaliation, or
harassment and taking appropriate measures to resolve the situation.
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
11
Employees
• Applying the County’s policies, guidance, and training with respect to equal employment opportunity
and conducting themselves in a manner that adheres to the County’s policies and guidance.
• Supporting a work climate that is conducive to achieving equal employment opportunities and that is
free of any form of discrimination or harassment.
• Promptly notifying or reporting to Department Heads, the Human Resources Department, or the
County attorney of all incidents of discrimination, retaliation, or harassment.
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
12
SECTION IV
APPENDIX A: DEMOGRAPHICS
Table 1: Population Change 2000-2020
2000 2010 2020 Change
2000-2010
Change
2010-2020
Change
2000-2020
Jasper County 20,678 24,777 28,791 19.8% 16.2% 39.2%
City of Hardeeville 1,793 2,952 7,473 64.6% 153.2% 316.8%
Town of Ridgeland 2,518 4,036 3,758 60.3% -6.9% 49.2%
Unincorporated Areas 16,367 17,789 17,560 8.7% -1.3% 7.3%
Source: U.S. Census Bureau, Decennial Census 2000-2020
Table 2: Race and Ethnicity 2000-2020
2000 2010 2020
Change
2000-
2010
Change
2010-
2020
Change
2000-
2020
Race
White 8,766 10,658 13,715 21.6% 28.7% 56.5%
Black or African American 10,895 11,406 9,645 4.7% -15.4% -11.5%
American Indian and Alaska Native 76 122 145 60.5% 18.9% 90.8%
Asian 92 176 197 91.3% 11.9% 114.1%
Native Hawaiian and Other Pacific Islander 10 13 24 30.0% 84.6% 140.0%
Some Other Race 700 2,050 3,029 192.9% 47.8% 332.7%
Two or More Races 139 352 2,036 153.2% 478.4% 1,364.7%
Ethnicity
Hispanic or Latino 1,190 3752 5,079 215.3% 35.4% 326.8%
Source: U.S. Census Bureau, Decennial Census 2000-2020
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
13
Table 3: Age Distribution 2000-2020
2000 2010 2020 Change
2000-2010
Change
2010-2020
Change
2000-2020
Under 5 1,499 1,859 1,503 24.0% -19.2% 0.3%
5 to 9 1,602 1,711 1,594 6.8% -6.8% -0.5%
10 to 14 1,559 1,546 1,627 -0.8% 5.2% 4.4%
15 to 19 1,483 1,751 1,587 18.1% -9.4% 7.0%
20 to 24 1,527 1,969 1,713 28.9% -13.0% 12.2%
25 to 34 3,063 3,685 3,607 20.3% -2.1% 17.8%
35 to 44 3,282 3,217 3,267 -2.0% 1.6% -0.5%
45 to 54 2,538 3,524 3,201 38.8% -9.2% 26.1%
55 to 59 1,041 1,428 1,940 37.2% 35.9% 86.4%
60 to 64 815 1,300 2,237 59.5% 72.1% 174.5%
65 to 74 1,273 1,671 4,271 31.3% 155.6% 235.5%
75 to 84 738 785 1,784 6.4% 127.3% 141.7%
85 years and over 258 313 460 21.3% 47.0% 78.3%
Source: U.S. Census Bureau, Decennial Census 2000-2020
Table 4: Household Formation 2000-2020
2000 2010 2020 Change
2000-2010
Change
2010-2020
Change
2000-2020
Total Households 7,025 8,517 11,272 21.2% 32.3% 60.5%
Married Couple Household 3,565 3,768 5,284 5.7% 40.2% 48.2%
Male Householder (no spouse) 376 596 2,019 58.5% 238.8% 437.0%
Female Householder (no spouse) 1,176 1,580 3,293 34.4% 108.4% 180.0%
Average Household Size 2.75 2.73 2.71 -0.7% -0.7% -1.5%
Source: U.S. Census Bureau, Decennial Census 2000-2020
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
14
Table 5: Educational Attainment 2000-2020
2000 2010 2020 Change
2000-2010
Change
2010-2020
Change
2000-2020
Less than High School 4,569 3,740 2,823 -18.2% -24.5% -38.2%
High school 4,713 5,900 7,808 25.2% 32.3% 65.7%
Some College or Associate's 2,685 3,844 5,850 43.2% 52.2% 117.9%
Bachelor's degree 808 998 3,161 23.5% 216.7% 291.2%
Graduate or professional degree 337 402 1,322 19.4% 228.6% 292.3%
Source: U.S. Census Bureau, American Community Survey 5-Year Estimates 2000-2020
Table 6: Income 2000-2020
2000 2010 2020 Change
2000-2010
Change
2010-2020
Change
2000-2020
Median Household Income $30,727 $37,393 $45,924 21.7% 22.8% 49.5%
Inflation Adjusted $45,990 $43,976 $45,924 -4.4% 4.4% -0.1%
Per Capita Income $14,161 $17,997 $24,886 27.1% 38.3% 75.7%
Inflation Adjusted $21,195 $21,165 $24,886 -0.1% 17.6% 17.4%
Source: U.S. Census Bureau, American Community Survey 5-Year Estimates 2000-2020
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
15
APPENDIX B: WORKFORCE ANALYSIS
The following data provides statistical summaries on Jasper County’s current workforce and the civilian labor
workforce or available workforce broken down by sex, race/ethnicity, and job classification. This section also
provides comparison of County workforce to the community workforce to help determine if there is
underutilization in the County government. In addition, it provides a comparison of County workforce between
2011 and 2021 to reflect changes in workforce overtime.
Comparison of County Workforce to Available Workforce
Workforce by Sex
The County’s workforce is predominantly male, while the available workforce is predominantly female. Males
comprise 53% of the County’s workforce and 47.5% of the available workforce. Females comprise 47% of the
County’s workforce and 52.5% of the available workforce. The County’s female workforce is under-
represented by 5.5%.
Figure 1: Workforce for All Job Categories by Sex in 2021
Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or
seeking employment, excluding those in the Armed Services.
53% 47%
County Workforce
Male Female
47.5% 52.5%
Available Workforce
Male Female
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
16
The County’s male workforce exceeds available workforce in Professionals by 31.2% and Service/Maintenance
by 5%. The County’s male workforce is under-represented in Officials/Administrators by 4.4%, Technician by
9.5%, Protective Services by 13%, Administrative Support by 11.5%, and Skilled Craft by 27.2%.
Figure 2: Male Workforce by Job Category in 2021
Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or
seeking employment, excluding those in the Armed Services.
55.0%
68.8%
40.0%
70.6%
10.3%
71.4%
70.8%
59.4%
37.6%
49.5%
83.6%
21.8%
98.6%
65.8%
Officials/Administrators
Professionals
Technicians
Protective Services
Administrative Support
Skilled Craft
Service/Maintenance
County Workforce Available Workforce
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
17
The County’s female workforce exceeds available workforce in Officials/Administrators 4.4%, Technicians by
9.5%, Administrative Support by 11.5%, and Skilled Craft by 27.2%. The County’s female workforce is under-
represented in Professionals by 31.1% and Service/Maintenance by 5%.
Figure 3: Female Workforce by Job Category in 2021
Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or
seeking employment, excluding those in the Armed Services.
45.0%
31.3%
60.0%
29.4%
89.7%
28.6%
29.2%
40.6%
62.4%
50.5%
16.4%
78.2%
1.4%
34.2%
Officials/Administrators
Professionals
Technicians
Protective Services
Administrative Support
Skilled Craft
Service/Maintenance
County Workforce Available Workforce
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
18
Workforce by Race and Ethnicity
The County’s workforce and available workforce are predominantly White. The County’s racial/ethnic
workforce exceeds available workforce in Whites by 3%, Blacks by 3.2%, and American Indian or Alaska Natives
by 0.6%. The County’s racial/ethnic workforce is under-represented in Asians by 0.7%, Hispanics by 5.5%, and
Others by 0.8%.
Figure 4: Workforce for All Job Categories by Race and Ethnicity in 2021
Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or
seeking employment, excluding those in the Armed Services.
57.3%
38.4%
0.6%
0.3%
0.3%
3.2%
0.0%
54.3%
35.2%
0.0%
1.0%
0.0%
8.7%
0.8%
White
Black or African American
American Indian or Alaska Native
Asian
Native Hawaiian or Other Pacific Islander
Hispanic or Latino
Other
County Workforce Available Workforce
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
19
Whites represent 57.3% of the County’s workforce and 54.3% of the available workforce. The County’s White
workforce exceeds available workforce in Technicians by 20.5%, Protective Services by 13.6%, Skilled Craft by
22.7%, and Service/Maintenance by 7.7%. The County’s White workforce is under-represented in
Officials/Administrators by 41.1%, Professionals by 6.8%, and Administrative Support by 3.5%.
Figure 5: White Workforce by Job Category in 2021
Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or
seeking employment, excluding those in the Armed Services.
42.5%
71.9%
80.0%
61.4%
54.0%
85.7%
37.5%
84.2%
78.7%
59.5%
47.8%
57.5%
63.0%
29.8%
Officials/Administrators
Professionals
Technicians
Protective Services
Administrative Support
Skilled Craft
Service/Maintenance
County Workforce Available Workforce
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
20
Blacks represent 38.4% of the County’s workforce and 35.2% of the available workforce. The County’s Black
workforce exceeds available workforce in Officials/Administrators by 43.8%, Professionals by 8%, Skilled Craft
by 7.5%, and Service/Maintenance by 3.9%. The County’s Black workforce is under-represented in Technicians
by 8.8%, Protective Services by 15.6%, and Administrative Support by 1.9%.
Figure 6: Black or African American Workforce by Job Category in 2021
Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or
seeking employment, excluding those in the Armed Services.
52.5%
21.9%
20.0%
36.6%
36.8%
14.3%
62.5%
8.7%
13.9%
28.8%
52.2%
38.7%
6.8%
58.6%
Officials/Administrators
Professionals
Technicians
Protective Services
Administrative Support
Skilled Craft
Service/Maintenance
County Workforce Available Workforce
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
21
American Indians or Alaska Natives represent 0.6% of the County’s workforce and 0% of the available
workforce. The County’s American Indian or Alaska Native workforce exceeds available workforce in
Officials/Administrators by 2.5% and Professionals by 3.1%. The County’s American Indian or Alaska Native
workforce is not represented at all in Technicians, Protective Services, and Administrative Support, Skilled Craft
by, and Service/Maintenance
Figure 7: American Indian or Alaska Native Workforce by Job Category in 2021
Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or
seeking employment, excluding those in the Armed Services.
2.5%
3.1%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
Officials/Administrators
Professionals
Technicians
Protective Services
Administrative Support
Skilled Craft
Service/Maintenance
County Workforce Available Workforce
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
22
Asians represent 0.3% of the County’s workforce and 1% of the available workforce. The County’s Asian
workforce exceeds available workforce in Officials/Administrators by 2.5%. The County’s Asian workforce is not
represented at all in Professionals, Technicians, Protective Services, and Administrative Support, Skilled Craft
by, and Service/Maintenance. Among these, the under-representations are 6.4% in Professionals and -1.1% in
Administrative Support.
Figure 8: Asian Workforce by Job Category in 2021
Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or
seeking employment, excluding those in the Armed Services.
2.5%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
6.4%
0.0%
0.0%
1.1%
0.0%
0.0%
Officials/Administrators
Professionals
Technicians
Protective Services
Administrative Support
Skilled Craft
Service/Maintenance
County Workforce Available Workforce
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
23
Native Hawaiians or Other Pacific Islanders represent 0.3% of the County’s workforce and 0% of the available
workforce. The County’s Native Hawaiian or Other Pacific Islander workforce exceeds available workforce in
Professionals by 3.1%. The County’s Asian workforce is not represented at all in Officials/Administrators,
Technicians, Protective Services, and Administrative Support, Skilled Craft by, and Service/Maintenance.
Among these, the under-representations are 0.2% in Administrative Support.
Figure 9: Native Hawaiian or Other Pacific Islander Workforce by Job Category for in 2021
Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or
seeking employment, excluding those in the Armed Services.
0.0%
3.1%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.2%
0.0%
0.0%
Officials/Administrators
Professionals
Technicians
Protective Services
Administrative Support
Skilled Craft
Service/Maintenance
County Workforce Available Workforce
EQUAL EMPLOYMENT OPPORTUNITY PLAN MAY 2024
24
Hispanics represent 3.2% of the County’s workforce and 8.7% of the available workforce. The County’s
Hispanic workforce exceeds available workforce in Protective Services by 2% and Administrative Support by
6.8%. The County’s Hispanic workforce is not represented at all in Officials/Administrators, Professionals,
Technicians, Skilled Craft, and Service/Maintenance, with under representation by 4.7%, 1%, 11.7%, 30.1%,
and 9.9% respectively.
Figure 10: Hispanic or Latino Workforce by Job Category in 2021
Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or
seeking employment, excluding those in the Armed Services.
0.0%
0.0%
0.0%
2.0%
9.2%
0.0%
0.0%
4.7%
1.0%
11.7%
0.0%
2.4%
30.1%
9.9%
Officials/Administrators
Professionals
Technicians
Protective Services
Administrative Support
Skilled Craft
Service/Maintenance
County Workforce Available Workforce
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
25
Summary of Workforce Utilization
Table 7: Workforce Utilization Analysis 2021
Job Categories
Male Female
White
Black or
African
American
American
Indian or
Alaska
Native
Asian
Native
Hawaiian
or Other
Pacific
Islander
Hispanic
or Latino Other White
Black or
African
American
American
Indian or
Alaska
Native
Asian
Native
Hawaiian
or Other
Pacific
Islander
Hispanic
or Latino Other
Officials/Administrators
Workforce # 12 10 0 0 0 0 0 5 11 1 1 0 0 0
Workforce % 30.0% 25.0% 0.0% 0.0% 0.0% 0.0% 0.0% 12.5% 27.5% 2.5% 2.5% 0.0% 0.0% 0.0%
CLS # 460 4 0 0 0 20 20 255 70 0 0 0 20 0
CLS % 54.2% 0.5% 0.0% 0.0% 0.0% 2.4% 2.4% 30.0% 8.2% 0.0% 0.0% 0.0% 2.4% 0.0%
Utilization % -24.2% 24.5% 0.0% 0.0% 0.0% -2.4% -2.4% -17.5% 19.3% 2.5% 2.5% 0.0% -2.4% 0.0%
Professionals
Workforce # 17 4 0 0 1 0 0 6 3 1 0 0 0 0
Workforce % 53.1% 12.5% 0.0% 0.0% 3.1% 0.0% 0.0% 18.8% 9.4% 3.1% 0.0% 0.0% 0.0% 0.0%
CLS # 290 50 0 30 0 10 0 505 90 0 35 0 0 0
CLS % 28.7% 5.0% 0.0% 3.0% 0.0% 1.0% 0.0% 50.0% 8.9% 0.0% 3.5% 0.0% 0.0% 0.0%
Utilization % 24.4% 7.5% 0.0% -3.0% 3.1% -1.0% 0.0% -31.3% 0.5% 3.1% -3.5% 0.0% 0.0% 0.0%
Technicians
Workforce # 2 0 0 0 0 0 0 2 1 0 0 0 0 0
Workforce % 40.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 40.0% 20.0% 0.0% 0.0% 0.0% 0.0% 0.0%
CLS # 135 75 0 0 0 65 0 195 85 0 0 0 0 0
CLS % 24.3% 13.5% 0.0% 0.0% 0.0% 11.7% 0.0% 35.1% 15.3% 0.0% 0.0% 0.0% 0.0% 0.0%
Utilization % 15.7% -13.5% 0.0% 0.0% 0.0% -11.7% 0.0% 4.9% 4.7% 0.0% 0.0% 0.0% 0.0% 0.0%
Protective Services
Workforce # 84 22 0 0 0 2 0 10 34 0 0 0 1 0
Workforce % 54.9% 14.4% 0.0% 0.0% 0.0% 1.3% 0.0% 6.5% 22.2% 0.0% 0.0% 0.0% 0.7% 0.0%
CLS # 150 130 0 0 0 0 0 10 45 0 0 0 0 0
CLS % 44.8% 38.8% 0.0% 0.0% 0.0% 0.0% 0.0% 3.0% 13.4% 0.0% 0.0% 0.0% 0.0% 0.0%
Utilization % 10.1% -24.4% 0.0% 0.0% 0.0% 1.3% 0.0% 3.6% 8.8% 0.0% 0.0% 0.0% 0.7% 0.0%
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
26
Job Categories
Male Female
White
Black or
African
American
American
Indian or
Alaska
Native
Asian
Native
Hawaiian
or Other
Pacific
Islander
Hispanic
or Latino Other White
Black or
African
American
American
Indian or
Alaska
Native
Asian
Native
Hawaiian
or Other
Pacific
Islander
Hispanic
or Latino Other
Paraprofessional
Workforce # 0 0 0 0 0 0 0 0 1 0 0 0 0 0
Workforce % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 0.0% 0.0% 0.0% 0.0% 0.0%
CLS # n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
CLS % n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Utilization % n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Administrative Support
Workforce # 7 2 0 0 0 0 0 40 30 0 0 0 8 0
Workforce % 8.0% 2.3% 0.0% 0.0% 0.0% 0.0% 0.0% 46.0% 34.5% 0.0% 0.0% 0.0% 9.2% 0.0%
CLS # 400 65 0 25 4 15 0 945 840 0 0 0 40 4
CLS % 17.1% 2.8% 0.0% 1.1% 0.2% 0.6% 0.0% 40.4% 35.9% 0.0% 0.0% 0.0% 1.7% 0.2%
Utilization % -9.1% -0.5% 0.0% -1.1% -0.2% -0.6% 0.0% 5.6% -1.4% 0.0% 0.0% 0.0% 7.5% -0.2%
Skilled Craft
Workforce # 4 1 0 0 0 0 0 2 0 0 0 0 0 0
Workforce % 57.1% 14.3% 0.0% 0.0% 0.0% 0.0% 0.0% 28.6% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
CLS # 675 75 0 0 0 330 0 15 0 0 0 0 0 0
CLS % 61.6% 6.8% 0.0% 0.0% 0.0% 30.1% 0.0% 1.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Utilization % -4.5% 7.4% 0.0% 0.0% 0.0% -30.1% 0.0% 27.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Service/Maintenance
Workforce # 4 13 0 0 0 0 0 5 2 0 0 0 0 0
Workforce % 16.7% 54.2% 0.0% 0.0% 0.0% 0.0% 0.0% 20.8% 8.3% 0.0% 0.0% 0.0% 0.0% 0.0%
CLS # 595 1065 0 0 0 160 0 230 555 0 0 0 115 45
CLS % 21.5% 38.5% 0.0% 0.0% 0.0% 5.8% 0.0% 8.3% 20.1% 0.0% 0.0% 0.0% 4.2% 1.6%
Utilization % -4.9% 15.6% 0.0% 0.0% 0.0% -5.8% 0.0% 12.5% -11.7% 0.0% 0.0% 0.0% -4.2% -1.6%
Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or seeking employment, excluding those in the Armed
Services.
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
27
Table 8: Significant Workforce Underutilization 2021
Job Categories
Male Female
White
Black or
African
American
American
Indian or
Alaska
Native
Asian
Native
Hawaiian
or Other
Pacific
Islander
Hispanic
or Latino Other White
Black or
African
American
American
Indian or
Alaska
Native
Asian
Native
Hawaiian
or Other
Pacific
Islander
Hispanic
or Latino Other
Officials/
Administrators ✓ ✓ ✓ ✓ ✓
Professionals ✓ ✓ ✓ ✓
Technicians ✓ ✓
Protective
Services ✓
Paraprofessional
Administrative
Support ✓ ✓ ✓ ✓ ✓ ✓ ✓
Skilled Craft ✓ ✓
Service/
Maintenance ✓ ✓ ✓ ✓ ✓
Source: U.S. Census Bureau, Equal Employment Opportunity Data (reflecting persons 16 years of age or older who were employed or seeking employment, excluding those in the Armed
Services.
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
28
Comparison of County Workforce between 2011 and 2021
Workforce by Sex
A comparison of County’s workforce between 2011 and 2021 reflects predominant males. However, the
County saw an increase of female workforce from 41.9% in 2011 to 47% in 2021.
Figure 11: Workforce for All Job Categories by Sex between 2011 and 2021
Source: Jasper County EE04 Report 2011 and 2021
58.1%
41.9%
County Workforce 2011
Male Female
53% 47%
County Workforce 2021
Male Female
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
29
For males, there was a decrease in Officials/Administrators, Professionals, Paraprofessionals, and Skilled Craft;
while there was an increase in Technicians, Administrative Support, and Service/Maintenance. A
representation of males in Protective Services was roughly unchanged.
Figure 12: Male Workforce by Job Category between 2011 and 2021
Source: Jasper County EE04 Report 2011 and 2021
66.7%
75.9%
20.0%
70.5%
57.4%
5.7%
85.4%
0.0%
55.0%
68.8%
40.0%
70.6%
0.0%
10.3%
71.4%
70.8%
Officials/Administrators
Professionals
Technicians
Protective Services
Paraprofessionals
Administrative Support
Skilled Craft
Service/Maintenance
2011 2021
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
30
For females, there was a decrease in Technicians and Administrative Support, while there was an increase in
Officials/Administrators, Professionals, Paraprofessionals, Skilled Craft, and Service/Maintenance. A
representation of females in Protective Services was roughly unchanged.
Figure 13: Female Workforce by Job Category between 2011 and 2021
Source: Jasper County EE04 Report 2011 and 2021
33.3%
24.1%
80.0%
29.5%
42.6%
94.3%
14.6%
0.0%
45.0%
31.3%
60.0%
29.4%
100.0%
89.7%
28.6%
29.2%
Officials/Administrators
Professionals
Technicians
Protective Services
Paraprofessionals
Administrative Support
Skilled Craft
Service/Maintenance
2011 2021
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
31
Workforce by Race and Ethnicity
A comparison of County’s workforce between 2011 and 2021 reflects predominant Whites with roughly
unchanged representation from 57.3% in 2011 to 57.5% in 2021. The County saw an increase of Black
workforce from 41.9% in 2011 to 47% in 2021. For the same period, the representation of other races and
ethnicity decreased: American Indians and Alaska Natives (0% to 0.6%), Asians or Native Hawaiians or Other
Pacific Islanders (0.3% to 0.6%), and Hispanics (0.7% to 3.2%).
Figure 14: Workforce for All Job Categories by Race and Ethnicity between 2011 and 2021
Source: Jasper County EE04 Report 2011 and 2021
57.5%
41.5%
0.0%
0.3%
0.7%
57.3%
38.4%
0.6%
0.6%
3.2%
White
Black or African American
American Indian or Alaska Native
Asian or Native Hawaiian or Other Pacific Islander
Hispanic or Latino
County Workforce 2011 County Workforce 2021
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
32
For Whites, there was a decrease in Officials/Administrators, Professionals, Paraprofessionals, and
Administrative Support; while there was an increase in Technicians, Protective Services, and
Service/Maintenance. In 2011, Whites were not represented at all in Service/Maintenance. In 2021, Whites
were not represented at all in Paraprofessionals.
Figure 15: White Workforce by Job Category between 2011 and 2021
Source: Jasper County EE04 Report 2011 and 2021
75.0%
89.7%
40.0%
32.6%
75.9%
71.7%
41.5%
0.0%
42.5%
71.9%
80.0%
61.4%
0.0%
54.0%
85.7%
37.5%
Officials/Administrators
Professionals
Technicians
Protective Services
Paraprofessionals
Administrative Support
Skilled Craft
Service/Maintenance
County Workforce 2011 County Workforce 2021
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
33
For Blacks, there was a decrease in Technicians, Protective Services, and Skilled Craft; while there was an
increase in Officials/Administrators, Professionals, Paraprofessionals, Administrative Support, and
Service/Maintenance. In 2011, Blacks were not represented at all in Service/Maintenance.
Figure 16: Black or African American Workforce by Job Category between 2011 and 2021
Source: Jasper County EE04 Report 2011 and 2021
20.8%
10.3%
60.0%
65.3%
24.1%
28.3%
58.5%
0.0%
52.5%
21.9%
20.0%
36.6%
100.0%
36.8%
14.3%
62.5%
Officials/Administrators
Professionals
Technicians
Protective Services
Paraprofessionals
Administrative Support
Skilled Craft
Service/Maintenance
County Workforce 2011 County Workforce 2021
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
34
In 2011, American Indians or Alaska Natives were not represented at all in all job categories. In 2021, they
were represented only Officials/Administrators and Professionals.
Figure 17: American Indian or Alaska Native Workforce by Job Category between 2011 and 2021
Source: Jasper County EE04 Report 2011 and 2021
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
2.5%
3.1%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
Officials/Administrators
Professionals
Technicians
Protective Services
Paraprofessionals
Administrative Support
Skilled Craft
Service/Maintenance
County Workforce 2011 County Workforce 2021
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
35
In 2011 and 2021, Asians or Native Hawaiians or Other Pacific Islanders were not represented at all in all job
categories, except for Officials/Administrators (4.2% in 2011 and 2.5% in 2021).
Figure 18: Asian or Native Hawaiian or Other Pacific Islander Workforce by Job Category between 2011 and
2021
Source: Jasper County EE04 Report 2011 and 2021
4.2%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
2.5%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
Officials/Administrators
Professionals
Technicians
Protective Services
Paraprofessionals
Administrative Support
Skilled Craft
Service/Maintenance
County Workforce 2011 County Workforce 2021
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
36
In 2011 and 2021, Hispanics were not represented at all in all job categories, except for Protective Services (2.1%
in 2011 and 2% in 2021) and Administrative Support (0% in 2011 and 9.2% in 2021).
Figure 19: Hispanic or Latino Workforce by Job Category between 2011 and 2021
Source: Jasper County EE04 Report 2011 and 2021
0.0%
0.0%
0.0%
2.1%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
2.0%
0.0%
9.2%
0.0%
0.0%
Officials/Administrators
Professionals
Technicians
Protective Services
Paraprofessionals
Administrative Support
Skilled Craft
Service/Maintenance
County Workforce 2011 County Workforce 2021
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
37
Summary of Workforce Utilization
Table 9: Workforce Utilization Analysis between 2011 and 2021
Job Categories
Male Female
White
Black or
African
American
American
Indian or
Alaska Native
Asian or
Native
Hawaiian or
Other Pacific
Islander
Hispanic or
Latino White
Black or
African
American
American
Indian or
Alaska Native
Asian or
Native
Hawaiian or
Other Pacific
Islander
Hispanic or
Latino
Officials/Administrators
Workforce 2011 % 58.3% 8.3% 0.0% 0.0% 0.0% 16.7% 12.5% 0.0% 4.2% 0.0%
Workforce 2021 % 30.0% 25.0% 0.0% 0.0% 0.0% 12.5% 27.5% 2.5% 2.5% 0.0%
Change in Utilization -28.3% 16.7% 0.0% 0.0% 0.0% -4.2% 15.0% 2.5% -1.7% 0.0%
Professionals
Workforce 2011 % 72.4% 3.4% 0.0% 0.0% 0.0% 17.2% 6.9% 0.0% 0.0% 0.0%
Workforce 2021 % 53.1% 12.5% 0.0% 3.1% 0.0% 18.8% 9.4% 3.1% 0.0% 0.0%
Change in Utilization -19.3% 9.1% 0.0% 3.1% 0.0% 1.6% 2.5% 3.1% 0.0% 0.0%
Technicians
Workforce 2011 % 0.0% 20.0% 0.0% 0.0% 0.0% 40.0% 40.0% 0.0% 0.0% 0.0%
Workforce 2021 % 40.0% 0.0% 0.0% 0.0% 0.0% 40.0% 20.0% 0.0% 0.0% 0.0%
Change in Utilization 40.0% -20.0% 0.0% 0.0% 0.0% 0.0% -20.0% 0.0% 0.0% 0.0%
Protective Services
Workforce 2011 % 29.5% 38.9% 0.0% 0.0% 2.1% 3.2% 26.3% 0.0% 0.0% 0.0%
Workforce 2021 % 54.9% 14.4% 0.0% 0.0% 1.3% 6.5% 22.2% 0.0% 0.0% 0.7%
Change in Utilization 25.4% -24.5% 0.0% 0.0% -0.8% 3.3% -4.1% 0.0% 0.0% 0.7%
Paraprofessional
Workforce 2011 % 53.7% 3.7% 0.0% 0.0% 0.0% 22.2% 20.4% 0.0% 0.0% 0.0%
Workforce 2021 % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100.0% 0.0% 0.0% 0.0%
Change in Utilization -53.7% -3.7% 0.0% 0.0% 0.0% -22.2% 79.6% 0.0% 0.0% 0.0%
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
38
Job Categories
Male Female
White
Black or
African
American
American
Indian or
Alaska Native
Asian or
Native
Hawaiian or
Other Pacific
Islander
Hispanic or
Latino White
Black or
African
American
American
Indian or
Alaska Native
Asian or
Native
Hawaiian or
Other Pacific
Islander
Hispanic or
Latino
Administrative Support
Workforce 2011 % 5.7% 0.0% 0.0% 0.0% 0.0% 66.0% 28.3% 0.0% 0.0% 0.0%
Workforce 2021 % 8.0% 2.3% 0.0% 0.0% 0.0% 46.0% 34.5% 0.0% 0.0% 9.2%
Change in Utilization 2.3% 2.3% 0.0% 0.0% 0.0% -20.0% 6.2% 0.0% 0.0% 9.2%
Skilled Craft
Workforce 2011 % 36.6% 48.8% 0.0% 0.0% 0.0% 4.9% 9.8% 0.0% 0.0% 0.0%
Workforce 2021 % 57.1% 14.3% 0.0% 0.0% 0.0% 28.6% 0.0% 0.0% 0.0% 0.0%
Change in Utilization 20.5% -34.5% 0.0% 0.0% 0.0% 23.7% -9.8% 0.0% 0.0% 0.0%
Service/Maintenance
Workforce 2011 % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Workforce 2021 % 16.7% 54.2% 0.0% 0.0% 0.0% 20.8% 8.3% 0.0% 0.0% 0.0%
Change in Utilization 16.7% 54.2% 0.0% 0.0% 0.0% 20.8% 8.3% 0.0% 0.0% 0.0%
Source: Jasper County EE04 Report 2011 and 2021
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
39
Table 10: Significant Improvement of Workforce Utilization between 2011 and 2021
Job Categories
Male Female
White
Black or
African
American
American
Indian or
Alaska Native
Asian or
Native
Hawaiian or
Other Pacific
Islander
Hispanic or
Latino White
Black or
African
American
American
Indian or
Alaska Native
Asian or
Native
Hawaiian or
Other Pacific
Islander
Hispanic or
Latino
Officials/Administrators ✓ ✓ ✓
Professionals ✓ ✓ ✓ ✓ ✓
Technicians ✓
Protective Services ✓ ✓ ✓
Paraprofessional ✓
Administrative Support ✓ ✓ ✓ ✓
Skilled Craft ✓ ✓
Service/Maintenance ✓ ✓ ✓ ✓
Source: Jasper County EE04 Report 2011 and 2021
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
40
APPENDIX C: DEFINITIONS OF RACE/ETHNICITY CATEGORIES
• White (Not Hispanic or Latino): A person having origins in any of the original people of Europe, the
Middle East, or North Africa.
• Black or African American (Not Hispanic or Latino): A person having origins in any of the black racial
groups of Africa.
• American Indian or Alaska Native (Not Hispanic or Latino): A person having origins in any of the
original people of North and South America (including Central America), and who maintain tribal
affiliation or community attachment.
• Asian (Not Hispanic or Latino): A person having origins in any of the original people of the Far East,
Southeast Asia, or the Indian Subcontinent, including, for example, Cambodia, China, India, Japan,
Korea, Malaysia, Pakistan, the Philippine Islands, Thailand, and Vietnam.
• Native Hawaiian or Other Pacific Islander (Not Hispanic or Latino): A person having origins in any of
the people of Hawaii, Guam, Samoa, or other Pacific Islands.
• Two or More Races (Not Hispanic or Latino): All persons who identify with more than one of the
above five races (White, Black or African American, Native Hawaiian or Other Pacific Islander, Asian,
American Indian or Alaska Native).
• Hispanic or Latino: A person of Cuban, Mexican, Puerto Rican, South or Central American, or other
Spanish culture or origin regardless of race.
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
41
APPENDIX D: DESCRIPTION OF JOB CATEGORIES
• Officials/Administrators: Occupations in which employees set broad policies, exercise overall
responsibility for execution of these policies, direct individual departments or special phases of the
agency’s operations, or provide specialized consultation on a regional, district or area basis. Includes:
department heads, bureau chiefs, division chiefs, directors, deputy directors, controllers, wardens,
superintendents, sheriffs, police and fire chiefs and inspectors, examiners (bank, hearing, motor
vehicle, warehouse), inspectors (construction, building, safety, rent-and-housing, fire, A.B.C. Board,
license, dairy, livestock, transportation), assessors, tax appraisers and investigators, coroners, farm
managers, and kindred workers.
• Professionals: Occupations which require specialized and theoretical knowledge which is usually
acquired through college training or through work experience and other training which provides
comparable knowledge. Includes: personnel and labor relations workers, social workers, doctors,
psychologists, registered nurses, economists, dietitians, lawyers, systems analysts, accountants,
engineers, employment and vocational rehabilitation counselors, teachers or instructors, police and
fire captains and lieutenants, librarians, management analysts, airplane pilots and navigators,
surveyors and mapping scientists, and kindred workers.
• Technicians: Occupations which require a combination of basic scientific or technical knowledge and
manual skill which can be obtained through specialized post-secondary school education or through
equivalent on-the-job training. Includes: computer programmers, drafters, survey and mapping
technicians, licensed practical nurses, photographers, radio operators, technical illustrators, highway
technicians, technicians (medical, dental, electronic, physical sciences), police and fire sergeants,
inspectors (production or processing inspectors, testers and weighers), and kindred workers.
• Protective Services: Occupations in which workers are entrusted with public safety, security and
protection from destructive forces. Includes: police patrol officers, firefighters, guards, deputy sheriffs,
bailiffs, correctional officers, detectives, marshals, harbor patrol officers, game and fish wardens, park
rangers (except maintenance), and kindred workers.
• Paraprofessionals: Occupations in which workers perform some of the duties of a professional or
technician in a supportive role, which usually require less formal training and/or experience normally
required for professional or technical status. Such positions may fall within an identified pattern of
staff development and promotion under the New Careers concept, including research assistants,
medical aides, child support workers, policy auxiliary welfare service aides, recreation assistants,
homemaker aides, home health aides, library assistants and clerks, ambulance drivers and attendants,
and kindred workers.
• Administrative Support: Occupations in which workers are responsible for internal and external
communication, recording and retrieval of data and/or information and other paperwork required in
an office. Includes: bookkeepers, messengers, clerk-typists, stenographers, court transcribers, hearing
reporters, statistical clerks, dispatchers, license distributors, payroll clerks, office machine and
computer operators, telephone operators, legal assistants, sales workers, cashiers, toll collectors, and
kindred workers.
EQUAL EMPLOYMENT OPPORTUNITY PLAN MARCH 2024
42
• Skilled Craft: Occupations in which workers perform jobs which require special manual skill and a
thorough and comprehensive knowledge of the process involved in the work which is acquired
through on-the-job training and experience or through apprenticeship or other formal training
programs. Includes: mechanics and repairers, electricians, heavy equipment operators, stationary
engineers, skilled machining occupations, carpenters, compositors and typesetters, power plant
operators, water and sewage treatment plant operators, and kindred workers.
• Service/Maintenance: Occupations in which workers perform duties which result in or contribute to
the comfort, convenience, hygiene or safety of the general public or which contribute to the upkeep
and care of buildings, facilities or grounds of public property. Workers in this group may operate
machinery. Includes: chauffeurs, laundry and dry-cleaning operatives, truck drivers, bus drivers, garage
laborers, custodial employees, gardeners and groundskeepers, refuse collectors, construction laborers,
park rangers (maintenance), farm workers (except managers), craft apprentices/trainees/helpers, and
kindred workers.
Draft dated 4/29/24
{10090-106 / 00108279 / V2}
_______________________________________________________________________________
_______________________________________________________________________________
ORDINANCE #O-2024-12
AN ORDINANCE
AUTHORISING THE EXECUTION AND DELIVERY OF CERTAIN INSTRUMENTS
RELATING TO THE ACQUISITION, CONSTRUCTION, RENOVATION, EQUIPPING, USE,
AND LEASING OF CERTAIN COUNTY FACILITIES; APPROVING THE ISSUANCE OF ST.
PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION
INSTALLMENT PURCHASE REVENUE BONDS AND BOND ANTICIPATION NOTES ;
CONSENTING TO THE FORM OF TRUST AGREEMENTS BETWEEN ST. PETERS
PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION AND THE CORPORATE
TRUSTEE; THE LEASE OF CERTAIN PERSONAL PROPERTY, REAL PROPERTY AND
THE BUILDINGS AND OTHER SITE IMPROVEMENTS LOCATED THEREON, BY JASPER
COUNTY, SOUTH CAROLINA TO ST. PETERS PARISH/JASPER COUNTY PUBLIC
FACILITIES CORPORATION, INCLUDING AUTHORISING THE EXECUTION AND
DELIVERY OF A BASE LEASE AGREEMENT, BETWEEN JASPER COUNTY AND ST.
PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION;
AUTHORISING THE EXECUTION AND DELIVERY OF A PUBLIC FACILITIES
PURCHASE AND OCCUPANCY AGREEMENT BETWEEN JASPER COUNTY AND ST.
PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION;
AUTHORISING THE EXECUTION AND DELIVERY OF A LEASE AGREEMENT
BETWEEN JASPER COUNTY AND ST. PETERS PARISH/JASPER COUNTY PUBLIC
FACILITIES CORPORATION; AND OTHER MATTERS RELATING THERETO.
_______________________________________________________________________________
_______________________________________________________________________________
{10090-106 / 00108279 / V2}
TABLE OF CONTENTS
(This Table of Contents for the Ordinance is for convenience of reference only and is not intended
to define, limit, or describe the scope or intent of any provision of the Ordinance)
Page
Section 1.
Approval of Leasing of New Facilities Real Property and Capital Projects
by County; Approval and Execution of Base Lease Agreement. ................................... 2
Section 2. Approval of Purchase and Use of the New Facilities Real Property and Capital
Projects by County; Approval and Execution of the Facilities Agreement. ................... 2
Section 3. Approval of Lease Purchase of the Capital Projects by County; Approval and
Execution of the Lease Agreement. ................................................................................. 2
Section 4. Agreement to Accept Title to Capital Projects. ............................................................... 3
Section 5. Consent to Creation of Corporation ................................................................................. 3
Section 6. Consent to Trust Agreement ............................................................................................ 3
Section 7. Consent to Leasehold Mortgage. ..................................................................................... 3
Section 8. Consent to and Approval of Obligations ......................................................................... 3
Section 9. Use of Proceeds of the Obligations .................................................................................. 3
Section 10. Sale of Obligations; Approval and Execution of Purchase Agreements ........................ 4
Section 11. Approval of Offering Documents .................................................................................... 4
Section 12. Consent to Appointment of Trustee ................................................................................. 4
Section 13. Authorisation for Issuance and Sale of BANs. ................................................................ 4
Section 14. Execution of Closing Documents and Obligations ......................................................... 5
Section 15. Law and Place of Enforcement of the Ordinance ............................................................ 5
Section 16. Effective Date ................................................................................................................... 5
Section 17. Severability ....................................................................................................................... 5
Section 18. Repeal of Inconsistent Ordinances ................................................................................... 5
Section 19. No Personal Liability........................................................................................................ 5
Section 19. Effect of Article and Section Headings and Table of Contents ....................................... 6
{10090-106 / 00108279 / V2}
AN ORDINANCE
AUTHORISING THE EXECUTION AND DELIVERY OF CERTAIN INSTRUMENTS
RELATING TO THE ACQUISITION, CONSTRUCTION, RENOVATION, EQUIPPING, USE,
AND LEASING OF CERTAIN COUNTY FACILITIES; APPROVING THE ISSUANCE OF ST.
PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION
INSTALLMENT PURCHASE REVENUE BONDS AND BOND ANTICIPATION NOTES;
CONSENTING TO THE FORM OF TRUST AGREEMENTS BETWEEN ST. PETERS
PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION AND THE CORPORATE
TRUSTEE; THE LEASE OF CERTAIN PERSONAL PROPERTY, REAL PROPERTY AND
THE BUILDINGS AND OTHER SITE IMPROVEMENTS LOCATED THEREON, BY JASPER
COUNTY, SOUTH CAROLINA TO ST. PETERS PARISH/JASPER COUNTY PUBLIC
FACILITIES CORPORATION, INCLUDING AUTHORISING THE EXECUTION AND
DELIVERY OF A BASE LEASE AGREEMENT, BETWEEN JASPER COUNTY AND ST.
PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION;
AUTHORISING THE EXECUTION AND DELIVERY OF A PUBLIC FACILITIES
PURCHASE AND OCCUPANCY AGREEMENT BETWEEN JASPER COUNTY AND ST.
PETERS PARISH/JASPER COUNTY PUBLIC FACILITIES CORPORATION;
AUTHORISING THE EXECUTION AND DELIVERY OF A LEASE AGREEMENT
BETWEEN JASPER COUNTY AND ST. PETERS PARISH/JASPER COUNTY PUBLIC
FACILITIES CORPORATION; AND OTHER MATTERS RELATING THERETO.
WHEREAS, St. Peters Parish/Jasper County Public Facilities Corporation ( the
“Corporation”) is a non-profit corporation formed under the provisions of Title 33, Chapter 31 of
the Code of Laws of South Carolina 1976, as amended; and
WHEREAS, the Corporation intends to finance a fleet of replacement pumper trucks for
the Jasper County Fire -Rescue department (the “New Equipment”), and intends to develop and
finance certain library facilities related to the Pratt Memorial Library (the “New Facilities”) located
within, and to be used by, Jasper County, South Carolina (the “County”) on real property currently
owned by the C ounty (the “New Facilities Real Property”); the undertaking to finance the New
Equipment and to develop and finance the New Facilities is referred to herein to be known as the
“Capital Projects;” and
WHEREAS, the Corporation has agreed to enter into a Base Lease Agreement (the “Base
Lease”), pursuant to which the C ounty will lease the New Facilities Real Property, including the
improvements located thereon, or portions thereof; to the Corporation so that the Corporation may
provide for the acquisition, construction, renovation, and equipping thereon of the New Facilities;
and
WHEREAS, in order to provide funds for the payment of the costs of the Capital Projects,
the Corporation is arranging for the issuance of an aggregate of not exceeding $[16,400,000]
Installment Purchase Revenue Bonds (the “Obligations”), in one or more series under and by the
terms of one or more Trust Agreements (collectively, the “Trust Agreement”), by and between the
Corporation and a trustee to be designated as provided herein (the “Trustee”); and
{10090-106 / 00108279 / V2} 2
WHEREAS, the C ounty intends to make certain acquisition or lease -purchase payments
(the “Acquisition Payments”) for the ac quisition or lease-purchase of the Capital Projects and,
pending acquisition thereof, shall be entitled to the use and occupancy of t he New Facilities Real
Property and the Capital Projects pursuant to the terms of the Public Facilities and Occupancy
Agreement (the “Facilities Agreement”), between the Corporation and the C ounty and the
Facilities Lease Agreement (the “Lease Agreement”) between the Corporation and the County; and
WHEREAS, the rights to receive Acquisition Payments are being assigned to the Trustee
under the Trust Agreement as security and the source of payment of the Obligations; and
WHEREAS, the Corporation will grant to the Trustee a l easehold mortgage interest in its
rights under the Base Lease Agreement as security for the Obligations pursuant to the Leasehold
Mortgage and Security Agreement (the “Leasehold Mortgage”); and
WHEREAS, the members of the Board of Directors of the Corporation propose to adopt a
resolution approving the Base Lease, the Facilities Agreement, the Lease Agreement, the Trust
Agreement, the Leasehold Mortgage, and the issuance and sale of the Obligations;
NOW, THEREFORE, BE IT ENACTED BY THE COUNTY COUNCIL OF JASPER
COUNTY, SOUTH CAROLINA, AS FOLLOWS:
Section 1. Appr
oval of Leasing of New Facilities Real Property and Capital Projects
by County; Approval and Execution of Base Lease Agreement. The conveyance of a leasehold
interest in the New Facilities Real Property and the Capital Projects, or any portions thereof, by the
County to the Corporation pursuant to the terms of the Base Lease Agreement is hereby approved,
and the form of the Base Lease Agreement as submitted herewith is hereby approved. The
Chairman of the C ounty Council (the “Chairman”) is hereby authori sed and directed to execute
and deliver the Base Lease Agreement, in substantially the form submitted herewith, with any
changes, insertions, and omissions as may be approved by the Chairman , with the advice of
counsel, his execution being conclusive evidence of his approval.
Section 2. Appro
val of Purchase and Use of the New Facilities Real Property and
Capital Projects by County; Approval and Execution of the Facilities Agreement. The purchase
and use of the New Facilities Real Property and the Capital Projects, or any portions thereof, by the
County from the Corporation pursuant to the terms set forth in the Facilities Agreement is hereby
approved, and the form of the Facilities Agreement as submitted herewith is hereby approved. The
Chairman is hereby authori sed and directed to execute and deliver the Facilities Agreement, in
substantially the form submitted herewith, with any changes, insertions, and omissions as may be
approved by the Chairman, with the advice of counsel, his execution being conclusive evidence of
his approval.
Section 3. Appro
val of Lease Purchase of the Capital Projects by County; Approval
and Execution of the Lease Agreement. The lease purchase of the Capital Projects, or any portions
thereof, by the County from the Corporation pursuant to the terms set forth in the Lease Agreement
is hereby approved, and the form of the Lease Agreement as submitted herewith is hereby
approved. The Chairman is hereby authorised and directed to execute and deliver the Lease
{10090-106 / 00108279 / V2} 3
Agreement, in substantially the form submitted herewith, with any changes, insertions, and
omissions as may be approved by the Chairman, with the advice of counsel, his execution being
conclusive evidence of his approval.
Section 4. Ag
reement to Accept Title to Capital Projects.
The County Council hereby agree to accept title to the Capital Projects and any other
property financed by the Obligations or the BANs (as hereinafter defined), including any additions
to the Capital Projects or that other property, when the Obligations are discharged.
Section 5. Cons
ent to Creation of Corporation. The County Council hereby confirm
and ratify the creation of the Corporation and consent to and approve the undertaking by the
Corporation respecting the Capital Projects.
Section 6. Cons
ent to Trust Agreement . The C ounty Council hereby consent to the
Trust Agreement now before this meeting, with any changes as may be thereafter made as shall be
in furtherance of the transactions contemplated therein and in this Ordinance and as shall not be
inconsistent with or contrary to the matters contemplated herein. The C ounty Council hereby
further consent to the execution and delivery of the Trust Agreement by the parties thereto. The
County Council covenant to observe and comply with all provisions pertaining to the County in the
Trust Agreement, including without limitation provisions concerning the use of proceeds of the
Obligations.
Section 7. Conse
nt to Leasehold Mortgage. The County Council hereby consent to the
Leasehold Mortgage now before this meeting, with any changes as may be thereafter made as shall
be in furtherance of the transactions contemplated therein and in this Ordinance and as shall not be
inconsistent with or contrary to the matters contemplated herein. The C ounty Council hereby
further consent to the execution and delivery of the Leasehold Mortgage by the parties thereto.
Section 8. Cons
ent to and Approval of Obligations. The C ounty Council hereby
consent to and approve the creation of the Corporation, the undertaking by the Corporation
respecting the Capital Projects, and the issuance of the Obligations in the aggregate principal
amount not to exceed $[16,400,000] ; provided, however, that the approval provided under the
Ordinance for the issuance of Obligations to finance the New Facilities s hall not exceed
$[5,600,000] and the approval provided hereunder for the issuance of Obligations to finance the
New Equipment shall not exceed $[ 10,800,000]. The Obligations may be issued in one or more
series over a period not to exceed five years, as approved by the County Administrator on behalf of
the County; provided, however, that the initial series of Obligations or BANs (as hereinafter
defined) shall be issued within one year of the date of enactment of this Ordinance.
Section 9. Us
e of Proceeds of the Obligations. The proceeds of the Obligations, net of
underwriter’s discount as provided in the respective bond purchase agreement, shall be applied, as
provided in the Trust Agreement, ( a) to provide the amounts necessary for the acquisition,
construction, renovation, and equipping of the Capital Projects (including any capitalized interest),
(b) to fund any necessary reserve fund for the Obligations, and (c) to pay costs of issuance of the
Obligations. Proceeds of the Obligations may be applied to refund BANs (as hereinafter defined)
{10090-106 / 00108279 / V2} 4
or other obligations of the County the proceeds of which were applied as described in this Section
9.
Section 10. S
ale of Obligations; Approval and Execution of Purchase Agreements. The
Obligations shall be sold from time to time as approved by the County Administrator to an
investment banking firm or firms or other institutional lenders or investors as designated by the
County Administrator as in the best interest of the County, pursuant to the terms of p urchase
agreements for a price as approved by the County Administrator . The County Administrator is
hereby authorised and directed to execute and deliver the respective purchase agreement for any
series of Obligations, in the form as may be approved by the County Administrator subject to the
provisions hereof, with the advice of counsel , his execution being conclusive evidence of his
approval.
Section 11. A
pproval of Offering Document s. The preparation and use of offering
documents, if deemed necessary by the County Administrator in the offering and sale of any series
of Obligations, are hereby authorised, confirmed, and ratified.
Section 12. C
onsent to Appointment of Trustee . The C ounty Administrator is hereby
authorised and directed to approve the appointment by the Corporation of one or more corporate
trustees, as Trustee, Registrar, and Paying Agent under the Trust Agreement.
Section 13. Aut horisation for Issuance and Sale of BANs.
(a) Authorisation of BAN s. The County hereby consents to the issuance by the
Corporation of one or more series of bond anticipation notes (the “BANs”) in order for the
Corporation to borrow on a temporary basis in anticipation of the receipt of the proceeds of the
Obligations; provided, however, that such BANs shall be discharged not later than five years after
the date of issue of the first series of BANs by the Corporation.
(b) Issuance of BANs. Th
e County hereby approves the borrowing by the Corporation
of not exceeding $[16,400,000] in anticipation of the issuance of the Obligations to be evidenced
by bond anticipation notes in the aggregate principal amount of not exceeding $[16,400,000]
outstanding at any one time, dated their date of issuance and maturing on a date approved by the
County Administrator not later than one year after the date of issuance of such BANs.
(c) Interest Rate on BANs . Th
e BANs shall bear interest at the rate of interest as
approved by the County Administrator.
(d) Redemption of BANs. Th
e BANs may be subject to redemption on the terms and
at the prices as approved by the County Administrator prior to their issuance and delivery.
(e) Sale of BANs. T
he BANs shall be sold by the Corporation on the terms and
conditions as the County Administrator determines to be in the best interest of the County.
(f) Security for the BANs. F or the payment of the BANs, the Corporation shall pledge
the proceeds derived from the sale of the Obligations and such other security as is provided
{10090-106 / 00108279 / V2} 5
therefor in the Trust Agreement.
(g) Additional BA Ns. The County hereby approves, subject to the limitations set forth
in paragraph (b) of this Section 13, the issuance by the Corporation of additional BANs secured by
a pledge of the proceeds of the Obligations upon maturity of the BANs in the event that
Obligations are not issued by the maturity date of such BANs.
Section 14. E xecution of Closing Documents . The Chairman, the County
Administrator, and all other appropriate officials and employees of the C ounty are hereby
authorised to execute, deliver, and receive any other agreements and documents as may be required
by the County in order to carry out, give effect to, and consummate the transactions contemplated
by the Base Lease Agreement , the Facilities Agreement, the Lease Agreement, and the purchase
agreements (collectively, the “County Agreements”).
Section 15. L aw and Place of Enforcement of the Ordinance. This Ordinance shall be
construed and interpreted in accordance with the laws of the State of South Carolina and all suits
and actions arising out of this Ordinance shall be instituted in a court of competent jurisdiction in
the State of South Carolina.
Section 16. E ffective Date. This Ordinance shall become effective immediately upon
approval after receiving third reading by the County Council.
Section 17. S everability. The provisions of this Ordinance are hereby declared to be
severable and if any section, phrase, or provision shall for any reason be declared by a court of
competent jurisdiction to be invalid or unenforceable, that declaration shall not affect the validity
of the remainder of the sections, phrases, and provisions hereof.
Section 18. R
epeal of Inconsistent Ordinances . All ordinances, resolutions, and parts
thereof in conflict herewith are, to the extent of the conflict, hereby repealed.
Section 19. N
o Personal Liability. No recourse shall be had for the enforcement of any
obligation, covenant, promise, or agreement of the County contained in this Ordinance, the County
Agreements, the Obligations or the BANs, against any member of the County Council, any officer
or employee, as such, in his or her individual capacity, past, present, or future, of the County, either
directly or through the County, whether by virtue of any constitutional provision, statute, or rule of
law, or by the enforcement of any assessment or penalty or otherwise; it being expressly agreed
and understood that this Ordinance , the C ounty Agreements, the Obligations, and the BANs are
solely corporate obligations, and that no personal liability whatsoever shall attach to, or be incurred
by, any member, officer, or employee as such, past, present, or future, of the County, either directly
or by reason of any of the obligations, covenants, promises, or agreements, entered into between
the County and the owners of the Obligations or the BANs or to be implied therefrom as being
supplemental hereto or thereto; and that all personal liability of that character against every such
member, officer, and employee is, by the enactment of this Ordinance and the execution of the
County Agreements, the Obligations, and the BANs, and as a condition of, and as a part of the
consideration for, the enactment of this Ordinance and the execution of the County Agreements,
the Obligations, and the BANs , expressly waived and released. The immunity of the members,
{10090-106 / 00108279 / V2} 6
officers, and employees, of the County under the provision contained in this Section shall survive
the termination of this Ordinance.
Section 20. E ffect of Article and Section Headings and Table of Contents. The heading
or titles of the several Articles and Sections hereof, and any table of contents appended hereto or
copies hereof, shall be solely for convenience of reference and shall not affect the meaning,
construction, interpretation, or effect of this Ordinance.
JASPER COUNTY, SOUTH CAROLINA
(SEAL)
By:
Its: Chairman, County Council
ATTEST:
Clerk, County Council
First Reading: April 1, 2024
Public Hearing June 3, 2024
Second Reading: May 6, 2024
Third Reading: June 3, 2024
1
STATE OF SOUTH CAROLINA
JASPER COUNTY
ORDINANCE #O-2024-14
ORDINANCE OF JASPER COUNTY COUNCIL
An Ordinance authorizing the sale of a right of way easement over
approximately 0.34 acres, 14,878 sq. ft., being a portion of TMS
042-00-05-040 adjacent t o the Interstate Highway I -95, to the
South Carolina Department of Transportation in order to facilitate
the widening, in exchange for the amount of $20, 900.00 in just
compensation, and to authorize the Jasper County Administrator to
execute such right of way easement and other documents as may be
necessary and appropriate to effect the transfer to the South
Carolina Department of Transportation , or its assigns, and matters
related thereto.
WHEREAS, The South Carolina Department of Transportation (“SCDOT”) is in
the process of widening Interstate 95 (“I -95”) through Jasper County from 4
lanes to six lanes; and
WHEREAS, in order to provide adequate area to perform the widening and its
associated improvements, including storm drainage, SCDOT has determined that
it is necessary to obtain for public use and purposes a right of way easement over
a 0.34 acre, 14,878 sq. ft. portion of TMS 042 -00-05-040, being part of a 51.24
acre parcel owned by Jasper County;
WHEREAS, SCDOT has performed an evaluation of the fair value of the
property desired, and has made an offer of $20, 000.00 as just compensation;
and
WHEREAS, in accordance with South Carolina law, Jasper County Council
must pass an ordinance authorizing the sale of real property , including
easements; and
WHEREAS, Jasper County Council finds th e terms of the SCDOT offer of
compensation to be fair, equitable and in the best interests of the citizens of
Jasper County;
2
NOW THEREFORE, BE IT RESOLVED by Jasper County Council, in council
duly assembled and by the authority of the same:
1. Jasper County Council adopts the foregoing recitals as part of this
Ordinance, and approves the sale of a right of way easement over the
referenced County property consisting of 0.34 acres of land, as shown on
the attached Exhibit “A”, for the sum of $20,900.00;
2. The Jasper County Administrator , with the assistance of the County
Attorney, is further authorized to execute and deliver on beh alf of J asper
County an executed right of way easement , in substantially the same form
as set forth in the attached Exhibit “B”, as well as a closing statements and
such other documents as may be necessary or desirable to accomplish the
creation of the right of way easement over the referenced property in favor
of the South Carolina Department of Transportation.
3. This Ordinance shall take effect upon approval of the Council.
Done this ____ day of _______________, 2024.
_________________________________
L. Martin Sauls, IV, Chairman
ATTEST:
_________________________________
Wanda H. Giles, Clerk to Council
ORDINANCE # O-2024-14
First Reading: 04.01.2024
Second Reading: 06.03.2024
Public hearing: 06.03.2024
Adopted: _________
Reviewed for form and draftsmanship by the Jasper County Attorney.
_______________________________________
David L. Tedder Date: _______________
6
'x
4
'
B
OX
C
U
L
V
E
R
T
6
'x4
'
B
O
X
C
U
L
V
E
R
T
6
'x4
'
D
B
L
B
O
X
C
U
L
V
E
R
T
6
'x4
'
D
B
L
B
OX
C
U
L
V
E
R
T
IE
=
9
.9
4
'
IE
=
9
.9
6
'
IE
=
9
.8
4
'
IE
=
9
.91
'
IE
=
1 0
.1 0
'
IE
=
1 0
.06
'
IE
=
1 0
.06
'
IE
=
9
.88
'
IE
=
1 0
.12
'
IE
=
10
.00
'
IE
=
1 0
.2
3
'
IE
=
10
.04
'
IE
=
9
.94
'
IE
=
9
.95
'
IE=9.83' IE=9.92'
IE
=
10
.30
'
IE=10.37'
.
L
B
D
'
4
x'
6
T
R
E
V
L
U
C
X
O
B
T
R
E
V
L
U
C
X
O
B
'
4
x'
6
L/P
WOVEN WIRE WOVEN WIRE
C
HA
IN
L
INK
FO
FO
V
CC CT
V
S
T-FO 2 4T-FO 24
T
-
F
O
24
T
-
5
0
T-100
S 22° 17' 53" W
COUNTYPREPARED
JASPER11 / 01 / 2023 SCALE FEET
050 100
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION
DRAWING 809-105-00.
SUBMITTED TO THE REGISTER OF DEEDS IN COMPLIANCE WITH SCDOT STANDARD
UPON COMPLETION OF CONSTRUCTION, A RECORDABLE RIGHT OF WAY PLAT SHALL BE
FROM SCDOT HEADQUARTERS; 955 PARK STREET, COLUMBIA, SC 29201. ADDITIONALLY,
IN DIRECT REFERENCE TO THE ENGINEERING PLANS, A COPY OF WHICH CAN BE OBTAINED
THIS EXHIBIT IS A GRAPHIC REPRESENTATION OF THE "AREA OF ACQUISITION" AND IS
EXHIBIT "A"
Page 3 of 3 Pages
AREA OF ACQUISITION FROM TRACT Proj. ID P040106
215.00' LT
+31.43
230.00' LT
+60.00
215.00' LT
+60.00
230.00' LT
+60.00
215.00' LT
+60.00TRANS. PERM. EASEMENT
200.00' LT
+03.71
230' PERM. EASEMENT
215' PERM. EASEMENT
215.00' LT
+75.00
230.00' LT
+75.00
TRANS. PERM. EASEMENT
215.00' LT
+37.38
230' PERM. EASEMENT
200.00' LT
+47.04
PRES. 175' R/W (27.301 1963) PRES. 175' R/W (27.301 1963) PRES. TRANS. R/W (2 7.3 0 1 1 9 6 3)
11'
11'
11'
11'
11'
11'
730
730
730
725
725
12'
12'
12'
12'
12'
720
720
65 70
S-422 EXIST. C/L STA. 63+77.77
BEGIN CONSTRUCTION
S 22° 17' 53" W
S 22° 17' 53" WS 22° 17' 53" W
S 22° 17' 53" W
175.00' RT
+91.27 (I-95 EXIST. C)
C10'
F17'
F32'
F32' F35'
F31'
F37'
F31'
F33'
F33'
F35'
F29'
F30'
C9'
C11'
F19'
F38'F35'
F38'
F35'
F37'F19'
F31'F35'
F16'
C10'
F99'
F99' F99' F102' F101'
F104' F105' F104' F103' F103'
F4'
F7'
F6'
F5'F2'
F5'F4'
F2'
F103' F100' F102'F102' F104'
F108' F105' F106' F105' F102'
F107'
12'
12'
12'
12'
12'
12'
725720
S-422 (MEDICAL CENTER DR.)
I-95 SB
I-95
I-95 NB
I-95
I-95 SB
I-95 NB
S-422 (MEDICAL CENTER DR.)
CONSTRUCTION `
EXISTING `
CONSTRUCTION `
3
2
4 5
45
44
CONSTRUCTION `
CONSTRUCTION `
EXISTING `
PRES. 200' R/W (27.301 1963) PRES. 200' R/W (27.301 1963) PRES. 200' R/W (27.301 1963)
14,878 SF(0.34 AC)
OBTAIN
C/AC/AC/AC/A
TSIXE
C/AC/AC/AC/A
TSIXE
C/A
TSIXE C/A
TSIXE
C/A
TSIXE
S-422 EXIST. C/L STA. 75+00.00
END CONSTRUCTION
75
N
2
01 / 24 / 2024
SCDOT R/W Form 801EXHI (10-2019)
GRANTEE’S ADDRESS (Return Address): SCDOT, Director, Rights of Way, P. O. Box 191, Columbia, SC 29202-0191
Date Checked By
Project ID No. P040106 Route I-95 Tract 2
Page 1 of 3 Pages
THE STATE OF SOUTH CAROLINA RIGHT OF WAY
EASEMENT
COUNTY OF JASPER Approximate Survey Stations
KNOW ALL MEN BY THESE PRESENTS, That I (or we) Jasper County, P .O. Box 1149,
Ridgeland, South Carolina 29936 in consideration of the sum of Twenty Thousand Nine Hundred and
No/100 ($20,900.00) Dollars, to me (or us) in hand paid, and other valuable consideration at and before the sealing
and delivering thereof, by the South Carolina Department of Transportation, receipt of which is hereby acknowledged,
have granted, bargained, sold and released, and by these presents do grant, give, bargain, sell and release, unto the said
South Carolina Department of Transportation, its successors and assigns, an easement or right of way for the
construction, improvement, operation and maintenance of a public road know n as a State Highway from 1.07 Miles
North of US-278 (Exit 8) to 0.57 Miles Southwest of Georgia State Line on Route I-95, State and County
aforesaid, as shown on plans prepared by the South Carolina Department of Transportation, upon and across the land
which I (or we) may own, in whole or in part, between the survey stations referenced above and as depicted and described
on the above reference plans together with, all and singular, the rights, members, hereditaments, and appurtenances
thereunto belonging, or in any way incident or appertaining. The grantor expressly recognizes the possibility that the
property herein may be used in the future by public utility or others granted the statutory right to use the right of way.
SPECIAL PROVISIONS:
The above consideration is for all that parcel or strip of land, to establish a right of way, containing 0.34 acre
(14,878 square feet), more or less, and all improvements, thereon, if any, owned by Jasper County, shown as the “Area
of Right of Way” on Exhibit A, attached hereto and made a part hereof.
Tax Map No. 042-00-05-040
64+00 To 73+00 Lt.
Road S-422 (Medical Center Dr.) Survey
To
To
Road/Route Route I-95
Project ID No. P040106
Tract 2
SCDOT R/W Form 801EXHI (10-2019)
Project ID No. P040106 Route I-95 Tract 2
Page 2 of 3 Pages
TO HAVE AND TO HOLD, all and singular, the said easement or right of way and the rights hereinabove
granted, unto the said South Carolina Department of Transportation, its successors and assigns forever for a public road,
highway, other public transportation purposes or other public uses as are permitted within and in conjunction with
highway rights of way and the grantors hereby dedicated their respective interest in said strip of land to public use for
such purposes.
It is agreed that buildings, fences, signs or other obstructions will not be erected by me (or us), my (or our) heirs,
assigns or administrators within the limits of the right of way herein conveyed.
IN WITNESS WHEREOF, I (or we) have hereunto set my (or our) hand(s) and seal(s) this ________ day of
_________________________, in the year of our Lord, Two Thousand and Twenty Four.
Signed, sealed and delivered in the presence of: Jasper County
1st Witness By: Andrew P. Fulghum
Its: County Administrator
Grantor (L.S.)
2nd Witness Grantor (L.S.)
NOTE: All right of way agreements must be in writing and are subject to rejection by the South Carolina Department of
Transportation.
THE STATE OF SOUTH CAROLINA )
) ACKNOWLEDGEMENT
COUNTY OF JASPER )
The foregoing instrument was acknowledged before me this ____day of _______________, 2024 by
Andrew P. Fulghum as its County Administrator on behalf of Jasper County.
Signature of Notary Public
Printed Name of Notary Public
NOTARY PUBLIC FOR THE STATE OF SOUTH CAROLINA
My Commission Expires:
(Affix seal if outside SC)
CSP PDD and DA Amendment Page 1 of 2
Jasper County
Planning and Building Services
358 Third Avenue - Post Office Box 1659
Ridgeland, South Carolina 29936
Phone (843) 717-3650 Fax (843) 726-7707
Lisa Wagner, CFM
Director of Planning and Building Services
lwagner@jaspercountysc.gov
Jasper County Council
Staff Report
Meeting Date: June 3, 2024
Project: Amendment of the CSP Planned Development District (PDD) Standards
and the CSP Development Agreement (DA)
Applicant: Peter Zadoretzky, Co-Manager, Conduit Street Partners
Tax Map Number: 041-00-03-030
Submitted For: Public Hearing and 2nd Reading
Recommendation: Planning Commission recommends approval of the proposed amendment
to the CSP PDD Standards and the CSP DA.
Description: The Applicant is requesting approval of an amendment to the CSP Planned
Development District (PDD) Standards and the CSP Development Agreement (DA). The CSP PDD
and DA was approved by Jasper County Council on June 27, 2022, as a single -family “for rent ”
community, with a maximum density of 275 units, all to be situated on one parcel of land, consisting
of 38.84 acres. The subject property is located along Independence Boulevard (Highway 278)
between Brickyard Road and Hilton Head Lakes.
The purpose of amending the CSP PDD and DA is to add language to allow the option of residential
uses “for rent” or “for sale” that can be situated on “unsubdivided land” or “subdivided land”. Of
course, the “for sale” option will be situated on subdivided lots. The approved CSP PDD and DA
only assume residential units “for rent” that would be s ituated on one parcel of land . In order to
support the residential u nits “for sale on subdivided lots ,” minimum lot size and setback s are
included as part of the proposed amendment to the PDD Standards. Exhibit A – 2 of the Ordinance is
a redline version of the amendment to the PDD Standards outlining the proposed changes. Exhibit A
– 1 is a clean copy of the proposed amendment and if approved it will be recorded at the Register of
Deeds Office.
Exhibit B – 2 of the Ordinance is the redline version of t he proposed amendment to the DA and
consists of very minimal changes, primarily to identify the community as a single-family community
rather than a single family “rental” community. Exhibit B – 1 is the clean copy of the proposed
amendment and if approved it will be recorded at the Register of Deeds Office.
CSP PDD and DA Amendment Page 2 of 2
Analysis: The proposed amendment does not chang e the Concept Plan, the density, the land use, or
the layout of the community , roads, and utilities. However, since the CSP PDD Standards and
Development Agreement were previously adopted, any changes to either document must be
approved by the County Council.
Staff Recommendation: The Planning Commission reviewed the proposed amendment to the CSP
PDD Standards at their April 9, 2024 meeting and recommends approval.
Attachments:
1. Ordinance with Exhibits A – 1, A – 2, B – 1, and B – 2
2. Aerial Map
STATE OF SOUTH CAROLINA
JASPER COUNTY
ORDINANCE #O-2024-15
AN ORDINANCE OF
JASPER COUNTY COUNCIL
To amend: (i) Ordinance O-2022-16 to adopt updated
standards for the Planned Development District
encompassing a 38.84 acre parcel located on U.S. Highway
278 (the “Property”); and (ii) Ordinance O-2022-14 to
amend the development agreement (the “Development
Agreement”) between Jasper County (the “County”) and
Conduit Street Partners, LLC (“CSP” or the “Developer”)
that governs CSP’s development of the Property into a 275-
unit single-family residential community (the “Project”);
in both cases to allow for the possibility that the Project
may include not only “for rent” residential dwellings, but
also “for sale” residential dwellings; and matters related
thereto.
WHEREAS, on June 27, 2022, the Jasper County Council passed Ordinance O-2022-
16, recorded in Book 1105, Page 481 of the Jasper County Register of Deeds (the “PDD
Ordinance”), which ordinance adopted Planned Development District zoning for the
Property, subject to the planned development district standards attached thereto (the
“PDD Standards”), and the conceptual master plan attached as Exhibit B thereto.
WHEREAS, on June 27, 2022, the Jasper County Council also passed Ordinance O-
2022-14, recorded in Book 1107, Page 1678 of the Jasper County Register of Deeds (the
“Development Agreement Ordinance”, which ordinance approved the County’s entry into
and execution of the Development Agreement that had been negotiated between the
County and Conduit Street Partners, LLC, which Development Agreement governs the
relationship between the County and the Developer with regard to the Project.
WHEREAS, the Development Agreement Ordinance further contained a provision (in
Paragraph 2 thereof) that instituted a deadline of June 30, 2023, by which the
“Owner/Developer” (defined therein as CSP) must acquire legal title to the Property (the
“Acquisition Deadline”); otherwise, the Development Agreement would automatically be
null and void.
2
April 2024
WHEREAS, on October 11, 2022, the Jasper County Planning Commission approved
the CSP Development PDD Master Plan (the “PDD Master Plan”), which contemplated a
single family residential rental community containing 275 residential detached and
attached units, and associated amenities.
WHEREAS, on April 17, 2023, the Jasper County Council passed Ordinance O-2023-
06, recorded in Book 1123, Page 109 of the Jasper County Register of Deeds, which
ordinance amended the Development Agreement Ordinance to extend the Acquisition
Deadline through December 31, 2023, to give the Developer sufficient time to address
permitting delays with outside agencies.
WHEREAS, on October 16, 2023, the Jasper County Council passed Ordinance O-2023-
18, recorded in Book 1136, Page 407 of the Jasper County Register of Deeds, which
ordinance amended the Development Agreement Ordinance to: (i) clarify that the entity
to which the Property must be conveyed by the Acquisition Deadline includes the
successors and assigns of CSP; (ii) specify certain forms of assignment that must be used
for any assignment of CSP’s rights under the Development Agreement to any successor or
assign of CSP; and (iii) extend the Acquisition Deadline through the date which is ninety
(90) days after receipt of all final land use and development permit approvals, but no later
than December 31, 2024.
WHEREAS, the PDD Standards, the Development Agreement and the PDD Master Plan
all include a description of the principal use of the Property as a single-family, “for rent”
residential community, to be developed on a single, un-subdivided parcel of land that
would be owned by the Developer.
WHEREAS, since the inception of the Project, economic conditions and financing
structures have changed significantly, to the degree that the investment and financing
community has begun requiring additional “safety valve” options that would let lenders
mitigate likely losses by selling off portions of their collateral, if necessary.
WHEREAS, as a result of these changed financial circumstances, in order to attract
quality financing and investment partners, CSP desires to be able to retain, as an
alternative, a “for sale” use within the Project, which would include the ability to place
residential dwellings on subdivided parcels (as opposed to a single, commonly-owned
parcel as typically seen in a “for rent” context).
WHEREAS, notwithstanding this request for “for sale” residential dwellings, CSP fully
intends to develop the Project as a “for rent” residential community, with the “for sale”
option serving only as the “safety valve” necessary to attract suitable financing and
3
April 2024
investment which would allow the Project to be developed as a “for rent” residential
community, as originally and currently intended.
WHEREAS, in order to contemplate the alternative “for sale” use within the Project,
CSP desires to amend the PDD Standards, the Development Agreement and the PDD
Master Plan to provide for items that would be applicable in a “for sale” context due to
the possibility of subdivided lots within the Project, including standards such as setbacks,
lot areas/widths, and other master plan details.
WHEREAS, after giving the matter consideration, the Jasper County Council has
determined that it would be appropriate to pass an ordinance which:
(i) amends the PDD Ordinance (Ordinance O-2022-16) to adopt updated PDD
Standards that address the “for sale” alternative use and provide the
development standards applicable thereto (including those relating to any
subdivided lots); and
(ii) amends the Development Agreement Ordinance (Ordinance O-2022-14) to
adopt an updated Development Agreement that addresses the “for sale”
alternative use and the related matter of the subdivision of lots within the
Property.
NOW, THEREFORE, BE IT ORDAINED , by the Jasper County Council, duly
assembled and with authority of same, that the above premises be incorporated by
reference; and:
1. Ordinance O-2022-16 is hereby amended by substituting for the “Planned
Development District Standards” attached thereto, the updated Planned
Development District Standards attached hereto as Exhibit A-1 . The effect of
such substitution shall be to accept those changes shown in red and underlined in
the redlined version of the Planned Development District Standards attached
hereto as Exhibit A-2.
2. Ordinance O-2022-14 is hereby amended by substituting for the “Development
Agreement” attached thereto as Exhibit A, the updated Development Agreement
attached hereto as Exhibit B-1. The effect of such substitution shall be to accept
those changes shown in red and underlined in the redlined version of the
Development Agreement attached hereto as Exhibit B-2.
3. If any section, clause, paragraph, sentence or phrase of this ordinance, or any
application thereof, shall for any reason be held to be invalid or unconstitutional.,
4
April 2024
the invalid section, clause paragraph, sentence, phrase or application shall in no
way affect the remainder of this ordinance: and it is hereby declared to be the
intention of the County Council that the remainder of this ordinance would have
passed notwithstanding the invalidity or unconstitutionality of any section, clause
paragraph, sentence, phrase or application thereof.
4. This ordinance shall take effect upon approval by Council.
[Signatures Contained on Following Page]
Signature Page to Ordinance O-2024-_____
Martin L. Sauls, IV
Chairman
ATTEST:
Wanda H. Giles
Clerk to Council
, 2024
, 2024
, 2024
, 2024
ORDINANCE: -2024-__
First Reading: May 06
Public Hearing: June 03
Second Reading: June 03
Third Reading:
Adopted: , 2024
_____________________________________________
Reviewed for form and draftsmanship by the Jasper County Attorney.
__________________________
David Tedder Date
FIRST EXHIBIT TO ORDINANCE
EXHIBIT A-1
Updated Planned Development District Standards (CLEAN)
[attached]
SECOND EXHIBIT TO ORDINANCE
EXHIBIT A-2
Updated Planned Development District Standards (REDLINED)
[attached]
THIRD EXHIBIT TO ORDINANCE
EXHIBIT B-1
Updated Development Agreement (CLEAN)
[attached]
FOURTH EXHIBIT TO ORDINANCE
EXHIBIT B-2
Updated Development Agreement (REDLINED)
[attached]
PDD EXHIBIT A-1 “CLEAN”
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
TABLE OF CONTENTS
APPLICANT AND PLANNING TEAM……………………………………………………………………………………. 1
SECTION I – INTRODUCTION AND NARRATIVE………………………………………………………………… 2
A. The Property………………………………………………………………………………………………………………….. 2
B. Planned Development District Process……………………………………………………………………….. 3
C. Conceptual Master Plan………………………………………………………………………………………………… 4
D. Environmental Protection………………………………………………………………………………………………. 5
E. Water and Sewer Service……………………………………………………………………………………………… 5
F. Utility Service…………………………………………………………………………………………………………………… 5
G. Roadways and Traffic…………………………………………………………………………………………………….. 5
H. Tree Preservation and Replacement……………………………………………………………………………. 6
I. Parking…………………………………………………………………………………………………………………………….. 7
J. Stormwater Management………………………………………………………………………………………………. 7
K. Cultural and Historical Resources…………………………………………………………………………………. 7
L. Emergency Services………………………………………………………………………………………………………. 7
SECTION II – LAND USE DESIGNATION AND DEFINITIONS……………………………………………… 8
A. Introduction and Narrative………………………………………………………………………………………………. 8
B. Allowed Land Uses………………………………………………………………………………………………………….. 8
C. Allowed Density and Transfer of Density Between Planning Areas …………………………… 9
D. Definition of Land Use Terms and Density Terms ……………………………………………………….. 9
SCHEDULE OF EXHIBITS:
Exhibit A Site Location Map Exhibit I FEMA Flood Zones
Exhibit B Conceptual Master Plan Exhibit J BJWSA Availability to Serve Letter
Exhibit C Property Aerial Exhibit K Dominion Availability to Serve Letter
Exhibit D-1 Jasper County Zoning Map Exhibit L Palmetto Availability to Serve Letter
Exhibit D-2 Hardeeville Zoning Map Exhibit M Hargray Availability to Serve Letter
Exhibit E Wetlands Delineation Exhibit N Archaeological Report
Exhibit F Boundary Survey Exhibit O Concept Development Schedule
Exhibit G USDA Soils Data Exhibit P Fire Station and EMS Locations
Exhibit H Topography Exhibit Q Thomas & Hutton Traffic Memo
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 1
APPLICANT AND PLANNING TEAM
Owner………….………………………………………………………………………………………….Paul H. Anderson, Emily A.Tillman
& John F. Anderson
Developer / Applicant……………………………………..………………………………………………Conduit Street Partners, LLC
Annapolis, MD
Mr. Peter Zadoretzky
Land Planner and Engineer………………………………………………………………………..Thomas & Hutton Engineering
Savannah, GA
Mr. Lamar Mercer, P.E.
Mr. Scott Monson, P.E
Carolina Engineering Consultants, Inc
Beaufort, SC
Mr. Jeff P. Ackerman, P.E
Wetlands / Environmental Consultant and Permitting
…………….Newkirk Environmental Consultants, Inc.
Beaufort, SC
Mr. Ashley Howell
Archaeologist
……………………………………….………………………………………..…………….Brockington & Associates, Inc.
Savannah, GA
Mr. Alex Sweeney, MA, RPA
Land Use Attorney / Legal Counsel
……………………………………………………..…………………..Bouhan Falligant LLP
Savannah, GA
John D. Northup III, Esq.
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 2
CSP DEVELOPMENT
PLANNED DEVELOPMENT DISTRICT
AND
CONCEPTUAL MASTER PLAN
SECTION I:
INTRODUCTION AND NARRATIVE
The Conduit Street Partners, LLC project currently consists of one parcel located in Jasper
County, SC. Currently, the parcel is zoned Rural Preservation (“RP”) and is identified as PIN no.
041-00-03-030. The property is approximately 38.84 acres with substantial frontage on the north
side of U.S. Highway 278 situated between the Hilton Head Lakes North development to its east
and the Prime Storage facility to its west. The property is surrounded by City of Hardeeville land
nearly all of which is zoned PDD with a very small area zoned GC (the Prime Storage property).
The property has been in the Anderson Family estate for many years and was originally part of
the J.A. Coleman Estate. Exhibit A Site Location Map is attached.
The property is under agreement to be purchased from the Anderson family members by the
Applicant, Conduit Street Partners, LLC, who are pursuing a new PDD zoning encompassing all
the parcel to allow for the property to be deve loped under the stipulations set forth by the
proposed PDD zoning in accordance with the Jasper County Zoning Ordinance (ZO) and Land
Development Regulations (LDR) in effect at the time of submittal of this rezoning application .
Upon approval, the benefits of the proposed PDD Standards shall apply to the Applicant I Owner
and its successors and assignees. For the purposes of the P DD and Exhibit B Concept ual
Master Plan, the parcel is hereby known as a single project ( “CSP Development ”) in this
document henceforth.
A. THE PROPERTY
1. The CSP Development property is a raw, unimproved forested , predominately uplands
parcel in Jasper County. There are no nor have there ever been any existing buildings, structures,
or other facilities on the property. The property is surrounded by PDD zoned Hardeeville land to
its east, north and south and by Hardeeville GC zoned land to its west. It is bounded on its eastern
side by the Hilton Head Lakes North development – a large, golf course residential community
and one of the initial phases of the Hardeeville West Argent PDD development project. To the
north and contiguous to the CSP Development is an undeveloped, principally forested, and
regulated wetlands parcel which is also part of the West Argent PDD development project. West
of the property is an existing Prime Storage facility situated on land located in Hardeeville and
zoned GC. The southern property line of the property is frontage along the north side of highway
U.S. 278 – a four lane divided, center median, limited access highway. And on the other/south
side of U.S. 278 across the highway from the CSP Development there are two major Hardeeville
PDD land parcels. One of the parcels is a part of the existing Latitude Margaritaville development
and is at the present time planned to be Margaritaville’s future 70-acre retail/commercial phase.
The second parcel that is to the west and contiguous with the Latitude Marga ritaville land is
another very large Hardeeville PDD land parcel known as the Morgan PDD project . Both land
tracts on the south side of U.S. 278 immediately across the highway from the proposed CSP
Development are raw, unimproved but PDD zoned properties with existing Hardeeville
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 3
development agreements. Combined, the West Argent PDD, the Latitude Margaritaville PDD and
the Morgan Tract PDD amount to approximately 10,500 acres of Hardeeville development parcels
zoned PDD. The CSP Development 38.84-acre parcel has just under 2,700 feet of frontage along
the north side of U.S. 278 and will access this highway at one central location in alignment with
an existing median break. The CSP Development property will also have access to existing
Brickyard Road at the road’s eastern termination point which is located at the property’s western
property line. A Property Aerial (Exhibit C), a Jasper County Zoning Map (Exhibit D-1) and a
Hardeeville Zoning Map (Exhibit D-2) are provided.
2. The proposed PDD consists of approximately 38.84 acres and has an anticipated area of
approximately 37 acres of uplands and approximately 1.5 acres of jurisdictional wetlands, and 0.5
acres of non- jurisdictional wetlands (excluded waters – gum pond) based upon a preliminary
wetland exhibit prepared by Newkirk Environmental, dated December 2021 (see Exhibit E
Wetlands Delineation). The delineation of the wetlands within the property have been submitted
to the Army Corps of Engineers to obtain a valid Jurisdictional Determination. The Conceptual
Plan has taken into account the jurisdictional wetlands and has avoided any development impacts
to these areas. The property does not have any critical area or frontage on salt marsh or creeks.
3. Exhibit F Boundary Survey depicts the property boundary.
4. Exhibit G USDA Soils Data depicts soils types of the property
.
5. Exhibit H Topography depicts topographic information for the CSP Development
property. GIS data topography was used for the purposes of the exhibit. Elevations on the site
range from elevation 10.0 along its northern edge sloping quickly upwards to the property’s interior
where grades are relatively flat averaging between elevations 18.0 to 20.0 with two small knolls
on the west end of the property averaging elevation 24.0. Exhibit I FEMA Flood Zones Map
depicts the 2019 FEMA flood zones which indicate that the property is in FEMA zone “X” which
is defined to be an area of minimal flood hazard generally above or outside the 500- year flood
level. Finished floor elevations of building structures will adhere to current Flood Zone
requirements of the Jasper County Land Development Regulations.
B. PLANNED DEVELOPMENT DISTRICT PROCESS
1. The Planned Development District (P DD) was established by the Jasper County to
encourage flexibility in the development of land to promote its most appropriate, economical, and
efficient use as well as to encourage creative design and produce a better environment
particularly for large undeveloped tracts. The purpose of the PDD is to, among other things, permit
development for specialized purposes which are planned and developed on a unified basis. In
this case the specialized purpose is a first-class Single-Family Rental Home (“SFR”) community
as proposed by Conduit Street Partners, LLC . The homes themselves will be of unique design,
tasteful architecture and generally resemble single family detached and townhouse home types.
The community will be under one ownership structure which will maintain most all aspects of the
community, i.e., its infrastructure including its roads, the interior and exteriors of the homes and
the grounds on which they are constructed including the community amenities and open spaces.
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 4
C. CONCEPTUAL MASTER PLAN
It is anticipated that the Conduit Street Development property will be developed over a period of
no more than four to five years in as many as two phases in accordance with the Conceptual
Master Plan as set forth in this document and as the same may be supplemented by subsequent
master and development plans submitted pursuant to the provisions of this PDD (see Exhibit N
Concept Development Schedule). The Conceptual Master Plan sets forth the general scope of
the development including number of allowed units , development standards, infrastructure
requirements, and other guidelines. In addition to the Conceptual Master Plan, development of
the Property will be controlled by other provisions of the PDD.
The goal of this PDD is to produce a development that raises the quality of life and development
standards in the area while also anticipating the County’s existing and future needs for naturally
affordable single-family homes.
The Conduit Street Development Conceptual Master Plan displays a general and privately owned
and maintained roadway layout , general housing unit layout , open space areas as well as
amenities that will serve the property. The final l ocations of these site elements may vary at the
time of development permit. Proposed land uses in the development are detailed under Section
2 - Land Use Designation and Definitions.
The Conceptual Master Plan seeks to maintain open space requirements set forth in Section II,
D.3 of this PDD. The open space and amenities will be owned and maintained by the Applicant I
Owner, or other legally designated entity. Property deeded to a governmental or private utility
entity will be the maintenance responsibility of that entity.
The Conceptual Master Plan and the provisions of this P DD will constitute the zoning for the
Property and a waiver from the current Jasper County codes and regulations where differences
occur. However, activities in the PDD shall conform to all other Jasper County Zoning Ordinance
and Land Development Regulations where differences do not occur.
The provisions of the Conceptual Master Plan shall apply to development of the property. In the
event of a conflict , the hierarchy of documents will be the “to be approved”, (i ) Development
Agreement (DA), (ii) the PDD and Conceptual Master Plan and, (iii) the Master Plan (MP).
D. ENVIRONMENTAL PROTECTION
1. As part of the development process , the CSP Development will meet or exceed the
stormwater management requirements of Jasper County, and the requirements of South Carolina
Department of Health and Environmental Control (DHEC) and Office of Ocean and Coastal
Resource Management (OCRM) .The Applicant I Owner will prepare stormwater management
plans for the project as it is developed in acc ordance with a stormwater drainage master plan to
be prepared by a professional engineering firm licensed by the State of South Carolina. The
stormwater drainage master plan will address the hydrological characteristics of the entire site as
well as adjacent drainage patterns of relative importance. The plan will address pre-development
conditions and post -development stormwater management for flood control and sediment
reduction. This plan will also address storm water quality through, among other things, the use of
several types of BMP's (as established by the stormwater standards of the applicable state and
federal governmental regulations) to enhance water quality and protect the adjacent wetlands.
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 5
2. Approximately 4 percent of the site consists of regulated jurisdictional wetlands. Exhibit E
is a preliminary wetland plan prepared by Newkirk Environmental dated December 2021 which
depicts the preliminary observation of wetlands vs uplands for the project area. The wetland plan
has been submitted to the Army Corps of Engineers to obtain a jurisdictional determination prior
to development of the property.
3. There will be no development impacts to the regulated jurisdictional wetlands. Subject to
the approval of the Office of Ocean and Coastal Resource Management, the CSP Development
will seek to remove/fill the non-regulated “gum pond” located in proximity to the project’s proposed
main entrance off highway U.S. 278.
E. WATER AND SEWER SERVICE
Water and sewer service will be provided to the CSP Development by Beaufort Jasper Water and
Sewer Authority. Preliminary planning for the water and sewer systems will be provided at the
time of Initial Master Plan subm ittal to Jasper County. Preliminary discussions with Beaufort -
Jasper Water and Sewer Authority (BJWSA) indicate a willingness to serve the property. BJWSA
operates and maintains water and sewer systems within their service area upon completion by
the developer and acceptance by the Authority. See Exhibit J BJWSA Availability to Serve
Letter.
F. UTILITY SERVICE
1 . The CSP Development property is in the service territory of Dominion Energy tor natural
gas services, See Exhibit K Dominion Energy Availability to Serve Letter . The Applicant I
Owner will coordinate with Dominion Energy regarding planning for the CSP Development project.
2. The CSP Development property is in the service territory of Palmetto Electric Cooperative
tor electric services, See Exhibit L Palmetto Availability to Serve Letter. The Applicant I Owner
will coordinate with Dominion Energy regarding planning for the CSP Development project.
3. Hargray or/or another licensed provider will provide internet and communication services
to the CSP Development property . The Applicant/Owner will coordinate with the provider
regarding planning and installation of these services. All servicing is anticipated to be via f iber
optics cable to include broadband capability. See Exhibit M Hargray Availability to Serve
Letter.
4. Other Utility services shall be provided by legally established ent ities at the discretion of
the Applicant I Owner, provided such are in accordance with the franchising ordinances/licensing
with the County.
5. Utilities will be underground except as reasonably necessary for above ground support
facilities.
G. ROADWAYS AND TRAFFIC
1. The CSP Development PDD shall have on-site roads designed and constructed to the
standards of the Jasper County Land Development Regulations or other engineering standards
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 6
reasonably acceptable to the Jasper County Engineer. Roadway construction within SC DOT
right-of-way's will be in accordance with SCD OT standards. Roadway section details wil l be
submitted for review at time of development permit approval. Interconnectivity to other adjoining
tracts of land is not proposed. Public access into or across other private developments will not be
required. Roadway design standards may be modified subject to the approval of Jasper County
to reduce environmental impacts provided safety concerns are not compromised. All onsite roads
shall be privately owned and maintained.
2. The Appl icant I Owner intends to create up to three new points of vehicular access to
existing public roads and highways for the project . The first is proposed to be a main entrance
ingress and egress to U.S. 278 located and aligned with the center most existing highway median
cut. The second access location i s anticipated to provide ingress and egress to U.S. 278 at the
highway’s median cut fronting the eastern end of the property. The third point of vehicular
connectivity is planned as a proposed connection with existing Brickyard Road at the roads point
of termination at the property’s western property line and adjacent to the U.S. 278 right-of-way. A
traffic plan study will be provided at the Master Plan stage. The traffic study shall be reviewed by
the SCDOT and final configuration for the new accesses will be governed by the SC DOT. Final
entrance configuration and locations w ill be based upon SCD OT guidelines at the time of
development permit.
3. Access to the CSP Development PDD may be restricted and/or gated appropriately at
the Applicant I Owner's discretion. Sidewalks and possibly trails shall be provided within the PDD
at appropriate locations. The frequency and location of sidewalks or pathways shall be
established based upon anticipated pedestrian circulation within the project. Sidewalks and trails
shown on the Conceptual Master Plan are conceptual in nature and are subject to change over
the course of the development permit process.
4. Notwithstanding the provisions of section G hereof, roadway design standards may be
modified to reduce environmental impacts provided safety concerns are not compromised. To
protect and preserve significant natural property attributes including avoiding wetland impacts,
such design will be encouraged.
5. Reference Thomas & Hutton Traffic Memo Exhibit Q for preliminary traffic analysis and
commentary concluding no material traffic impacts to existing road systems.
6. TREE PRESERVATION AND REPLACEMENT
The CSP Development shall meet or exceed the minimum allowable post development tree
coverage requirements of Jasper County . Trees required and/or worthy of preserving shall be
incorporated into buffer areas around jurisdictional wetlands , in required buffer yards and in the
required Highway Corridor Overlay District 50’ buffer parallel and adjacent to the U.S. 278
Highway.
In those cases where the minimum allowable tree coverage cannot be met by preservation within
a required buffer area, replacement trees shall be planted to meet the tree types and quantities
as required by code. Trees to be preserved in buffer areas shall be identified and located by a
tree survey within the CSP Development PDD.
Plantings, including trees, situated in any buffer area shall be maintained in good health and any
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 7
dead or damaged plants will be replaced. And if any tree in a buffer is severely damaged due to
weather or other reasons, all severely damaged trees shall be replaced no later than the end of
the next dormant season.
I. PARKING
Parking for the CSP Development community shall be provided by a combination of attached
and/or detached residential parking garages and their corresponding driveways, and community
surface parking lots for overflow parking, the community amenity areas and leasing offices . All
parking shall be generally consistent with Jasper County development standards or as otherwise
proposed by the Applicant/Owner and approved by Jasper County.
J. STORMWATER MANAGEMENT
The CSP Development PDD shall conform to the Stormwater Management Provisions of the
Jasper County Land Development Standards including but not necessarily limited to the Jasper
County Stormwater Management Design Manual and applicable state and federal requirements.
Among other things, the post-development peak runoff discharge rate for the 2-, 10- and 25-year,
24-hour design storm events will be designed to control these rates to pre-development discharge
rates. Additionally, the CSP Development PDD shall design its stormwater system to manage a
100-year, 24-hour storm event without causing damage to on-site and offsite structures. Sufficient
stormwater best management practices will be employed in the development of the P DD to
ensure runoff leaving the site does not degrade water quality of the surrounding receiving waters.
K. CULTURAL AND HISTORICAL RESOURCES
As part of a comprehensive study of the property a Phase I and Phase II archeological
investigations and studies were conducted by Brockington & Associates. The investigations have
concluded that there are no archeological sites eligible for the National Register requiring
preservation or management considerations on the property. Exhibit N Archaeological Report
is attached.
L. EMERGENCY SERVICES
Fire and emergency medical services will be provided to the residents of the CSP Development
by no less than two Jasper County Fire-Rescue stations which are located less than 5 miles from
the property. FIRE STATION AND EMS LOCATIONS EXHIBIT P is attached identifying Jasper
County Fire Stations 34 and 35 and their distances (each less than 5 miles) and times in route to
the CSP Development.
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 8
SECTION II:
LAND USE DESIGNATION AND DEFINITIONS
A . INTRODUCTION and NARRATIVE
The Conceptual Master Plan consists of an area of approximately 38.84 acres. The proposed
predominate uses shall include but not be necessarily limited to:
• For-Rent Single Family Residential situated on an unsubdivided parcel(s) and/or on
subdivided individual platted lots
• Single Family For Sale Residential situated on subdivided individual platted lots
• Active and passive community amenity areas
• Model homes and leasing and sales centers
• Site infrastructure
The land use areas indicated on the Conceptual Master Plan are not intended to be rigid exact
boundaries for future improvements. The Conceptual Master Plan PDD for the CSP Development
shall maintain flexibility to accommodate specific soils conditions, environmental concerns,
physical constraints, market conditions and design parameters and as such, the exact location of
boundary lines and any proposed buildings or structures, between land uses and their subsequent
location and size indicated within the planning area shall be subject to change at the time of the
Master Plan Phase and Development Permit Plan submission; provided that maximum densities
and other conditions of the Development Agreement between the Applicant / Owner and Jasper
County, South Carolina will be adhered to strictly, unless adjustments are requested by the
Applicant / Owner and approved by Jasper County.
All rental residential dwelling units shall be owned, controlled and maintained by the Applicant or
its assigns or successors which units may be located on an unsubdivided parcel or individual
platted lots. Amenities, on-property infrastructure and improvements not dedicated or otherwise
conveyed to public or private third parties (such as a homeowner’s association) shall be owned,
controlled and maintained by the Applicant / Owner or its successors.
If at any time in the future rental homes that are situated on subdivided platted lots are sold and
owner occupied, these housing units shall be owned, controlled, and maintained by their
individual owners.
B. ALLOWED LAND USES
The following land uses shall be permitted in the CSP Development PDD. The purpose of this
portion of the PD D document is to state which land uses shall be allowed within the CSP
Development PDD and to clearly define development within the area. However, by allowing these
uses this does not obligate the Applicant / Owner to provide all of the uses or facilities herein. The
allowed land uses and definitions shall be as follows:
For-Rent and/or For Sale Single Family Residential
• Single Family Residential Dwelling - A detached or attached home used exclusively for
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 9
residential purposes which is either (i) leased to its tenant(s) located on a single parcel of
unsubdivided land or on subdivided platted lots and/or (ii) detached or attached homes
sold to buyers /homeowners which homes shall be located on single subdivided platted
lots. Dwelling units may have either private or shared access. Units may be arranged in a
variety of configurations including detached, attached, back-to-back, side to side, vertical
or any combination thereof.
• Home Sites - Individual un-platted parcels or individual platted lots available for short or
long-term lease for the rental homes or for owner occupied homes.
• Amenity Areas - including Club House / swimming pool / playground / bocce ball / cornhole
/ horseshoes / oyster tables / pickleball and tennis courts / amphitheater / fitness facility
or other recreational amenities.
• Mail kiosks including drone delivery station(s)
• Utilities
• Recreational Amenity Uses such as, but not limited to:
o Dog park
o Multi-use field(s)
o Gazebo
o Kayak, canoe and boat storage areas
o Trails or sidewalks
o Bike paths
o Mini-golf and/or golf putting green
o Pavilion
o Grilling areas
o Common open space and other active and passive recreational uses
o Maintenance Areas or Buildings
o Planting/vegetable garden(s)
Design Standards and Regulations may be establ ished for each area and use at the time of
development permit, unless agreed at development permit approval or in this PDD, the standard
for uses from the Jaser County Land Development Regulations shall apply.
Any easement that occurs within the property shall have the same land uses as any of the
adjacent land uses. Any restrictions shall be based on the legal definition of the easement.
C. ALLOWED DENSITY WITHIN PLANNING AREAS
1. Preliminary planning for the Property contemplates the Residential land uses {including
wetlands) for the entire property as depicted on the Conceptual Master Plan. The Conceptual
Master Plan layout may be modified at the time of development permit application.
2. The t
otal project is allowed a maximum of 275 Single Family Dwelling Units. The maximum
size per dwelling unit shall be 2,500 square feet. The minimum dwelling unit shall be 800 square
feet. The size and configuration of anticipated dwelling units displayed on the Conceptual Master
Plan may be modified at the time of development permit. The submitted Conceptual Site Plan
presently indicates 265 Single Family Dwelling Units.
3. Overall residential density may include both Attached and Detached Single Family
Residential dwelling units.
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 10
D. DEFINITIONS OF LAND USE TERMS AND DENSITY TERMS
In the absence of a term definition in this Conceptual Master Plan or in the proposed CSP
Development PDD with Jasper County, the definitions of the Jaser County Land Development
Regulations shall apply in the interpretation of this Conceptual Master Plan. The definitions below
shall generally describe the allowed uses and terms within the CSP Development PDD.
1. Acre
a. Gross Acre shall mean the entire acreage within the site boundaries.
b. Net Acre shall mean the acre which remains after deduction of easements for
existing utilities, wetland buffers, and onsite wetlands.
2. Maintenance Areas
The maintenance areas w ill contain the facilities , tools, and equi pment necessary to
maintain the common properties and amenit ies within the CSP Development PDD.
These facilities may be congregated on a central site or located in separate convenient
sites for different services such as general community mai ntenance, recreation area
maintenance or individual property regime maintenance.
Permitted uses include:
a. Storage of vehicles and parts , boats, recreational vehicles . tools, supplies, and
resident storage.
b. Offices associated with community and maintenance.
3. Open Space
Total open space for the Property shall be calculated for the boundary of the Property
and not on a s ite-specific basis for each par cel or phase of the Property , individual
development. or project. The Property shall provide at least 10% open space. Open
space shall be calculated based upon the total gross acreage. Open space shall consist
of the following:
a. Landscape s urface areas (areas not covered by buildings , parking.
impervious surface) including manicured village greens or equivalent
b. Lagoons, ponds, impoundments, and lakes (detention, retention, or
recreational)
c. Freshwater wetlands
d. Wetland buffers
e. Forest, wildlife preserves / corridors, conservation areas and greenbelts
f. Community Park, amenity areas and community garden plots
g. Recreation areas includi ng swimming pools, tennis courts, playgrounds ,
multi-purpose fields, lawn games, gardens, etc.
h. Pedestrian / bicycle trails /paths /nature trails
i. Perimeter buffers
4. Setbacks, Lot Sizes and Buffers
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 11
a. There shall be no minimum setbacks applied to the CSP Development PDD
unless noted otherwise in this PDD document. Setbacks and buffers sha ll
meet the minimum requirements established herein, and except as set forth
in this P DD Standards, s hall apply to the pe rimeter of the P DD on ly
provided, however, that any requi red wetlands buffers shall apply
according to law throughout the Property.
b. Setbacks /buffer areas shall be provided for jurisdictional wetlands within
the PDD. Setbacks / buffers for wetlands shall be 25 feet .
c. Perimeter buffer standards shall include:
(i) At adjacent property boundaries to the east and to the north of the
PDD ( adjacent properties to east and north are jurisdictional
wetlands) buffers shall be 20 feet at a m inimum. See P DD
Conceptual Master Plan for proposed perimeter buffers. A 50-foot
buffer shall be provided along the property’s boundary with the GC
zoned property to its west. Underground utilities and stormwater
management facilities are allowed in the perimeter buffer area.
(ii) At all buffers of the PDD, disturbances related to grading activities
are allowed prov ided that the following preservati on practices are
met:
(A) Within 50- foot U.S. 278 highway buffer a minimum of 7
broadleaf overstory trees, 8 understory trees, and 35 shrubs
shall be preserved or re-planted per
100 linear feet of U.S 278
frontage.
(iii) Highway 278 Corridor Overlay District (HCOD) standards shall be
adhered to provided that signage shall be governed by the
provisions established by the future Master Plan.
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 12
d. Lot Areas and Setbacks
(i) Single Family For Rent Homes and Single Family For Sale homes
will have setback and yard requirements as set forth in the below
TABLE 1:
CSP PDD DEVELOPMENT TABLE 1
MEASUREMENTS FOR UNSUBDIVIDED AND SUBDIVIDED RESIDENTIAL
Single Family Schedule of Lot Area, Yard, and Setbacks
Minimum Lot Per Unit
SF Patio4 Duplex5 Townhome6
Non-
Resi7
Unsubdivided Residential (For Rent Only)1 NA NA NA NA NA
Subdivided Residential (For Sale and/or
For Rent) 1700 NA NA 1000 NA
Minimum Yard and Building Setback (feet)
Single Family & Non-Residential Uses
SF Patio4 Duplex5 Townhome6
Non-
Resi7
Unsubdivided Residential Min lot width 2 NA NA NA NA NA
Subdivided Residential Min lot width 30 NA NA 18 NA
Front Yard (Measured from Edge of Road R/W)
Major Street (Multi-Lane)
NA NA NA NA
Major Street (Multi-Lane) NA NA NA NA
Minor Street 10 NA NA 10 NA
Side Yard3
Residential 5 NA NA 5
Non-Residential NA
Rear Yard3
Residential 10 NA NA 5
Non-Residential N/A
Notes:
1. "For Rent" homes can be situated on an unsubdivided single parcel and not on
individual subdivided lots. Therefore, there are no legal fee simple lots with defined
lot areas.
2. Because the "For Rent" homes can be situated on a unsubdivided single parcel
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 13
and not on individual subdivided fee simple lots, there are no defined lot dimensions.
3. For unsubdivided rental residential units, yard dimensions provided are minimum
side yard and back yard depths. In all cases, there shall be 10' minimum clear between structures.
4. Patio homes are not an included product.
5. Duplexes are not an included product.
6. Townhomes are two or more attached units with 5' side yards at each end
unit with 10' clear between adjacent structures.
7. Non-Resi is a non-residential/commercial use exclusive of community amenity improvements
and leasing and sales offices. Non-Resi uses are not an included product.
8. Setbacks are measured to the front, side or rear face of the principal structure and excludes
measurements to such things as HVAC equipment, stoops, ground level or upper-level decks,
or similar ancillary structures.
9. Minimum easement width for storm drain pipe of 15” to 24” in size shall not be less than 10 feet.
5. Wetlands
This designation allows the following uses within wetlands. Freshwater wetlands on the
property shall be those areas over which the applicable governmental agencies claim
jurisdiction for freshwater wetlands. Unless restricted via a future Memorandum of
Understanding (MPA) to the contrary, the following are permitted uses:
a. Open space and buffers
b. Conservation areas
c. Activities in all wetland areas as permitted by the U.S. Army Corps of
Engineers and/or the South Carolina Department of Health and
Environmental Control, Office of Ocean and Coastal Resource
Management as applicable
d. Disposal of reclaimed water as permitted by SCDHEC.
e. Boardwalks, trails, bridges, and other permitted structures.
f. Game Management
6. Utilities
This designation allows for utility service to serve the planning areas of the CSP
Development PDD. The following land uses shall be allowed only after written approval
from the Applicant I Owner and its consul tants for location and design. Screening,
buffering, and other aesthetic matters must meet or exceed the Jaser County Land
Development Regulations and may be approved at the time of site devel opment
application.
a. Potable water supply and distribution
b. Wastewater collection, treatment, and disposal
c. Stormwater collection, treatment and detention
d. Irrigation
e. Communication towers
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 14
f. Satellite antennas
g. Cable television facilities
h. Telephone facilities
i. Power transmission and distribution
j. Fiber optic lines
k. Other utility services i.e., Internet access and other tel ecommunication
uses
Certain comm unity-wide infrastructure is required for the devel opment of any large,
master-planned community. T his infrastructure may inc lude, but is not limited to the
following:
1. Arterial streets and primary access roads
2. Water supply
3. Wastewater Treatment and Effluent Disposal
4. Power substations
5. Central telephone facilities/ Cell phone towers
6. Stormwater Management Lagoons
7. Natural Gas Supply
8. Sewer Pump Station
Infrastructure serving the community (on-site and off-site) will be approved as part of the
development plan approval process.
7. Design Standards
Design Standards shall be submitted at the Master Plan stage and may have standards
deviating from the Jasper County Ordinances or this PDD, provided that health, safety,
ingress/egress, and fire protection are addressed to the satisfaction of the County.
EXHIBIT B
CONCEPTUAL MASTER PLAN
Single Family Residential Community
1
STATE OF SO
UTH CAROLINA ) DEVELOPMENT AGREEMENT
)
COUNTY OF JASPER ) CSP DEVELOPMENT TRACT
This Development Agreement ("Agreement") is made and entered this day of
, 2022 (the “ Effective Date”), by and between Conduit Street Partners, LLC (a
Maryland Limited Liability Company) ("Owner") and the governmental authority of the Jasper
County, South Carolina ("County").
WHEREAS, th
e legislature of the State of South Carolina has enacted the "South
Carolina Local Government Development Agreement Act (the "Act") as set forth in Sections 6-
31-10 through 6-31-160 of the South Carolina Code of Laws (1976), as amended; and,
WHEREAS
, the Act recognizes that the lack of certainty in the approval of
development can result in a waste of economic and land resources, can discourage sound
capital improvement planning and financing, can cause the cost of housing and development to
escalate, and can discourage commitment to comprehensive planning." [Section 6-31-10 (B)(1)];
and,
WHEREAS, t
he Act also states: "Development agreements will encourage the vesting of
property rights by protecting such rights from the effect of subsequently enacted local legislation
or from the effects of changing policies and procedures of local government agencies which
may conflict with any term or provision of the Development Agreement or in any way hinder,
restrict, or prevent the development of the project. Development Agreements will provide a
reasonable certainty as to the lawful requirements that must be met in protecting vested property
rights, while maintaining the authority and duty of government to enforce laws and regulations
which promote the public safety, health, and general welfare of the citizens of our State."
[Section 6-31-10 (B)(6)]; and,
EXHIBIT B-1
2
WHEREAS, the Act further authorizes local governments, including County governments,
to enter Development Agreements with owners to accomplish these and other goals as set forth
in Section 6-31-10 of the Act; and,
WHEREAS, Owner is the contract purchaser of approximately 38.84 acres, generally to
be known as CSP Development, and being more particularly described in Exhibit A and proposes
to develop, or cause to be developed, therein Residential uses, to include the potential of any
alternative allowed uses, including accessory and complimentary uses as described in the
Planned Development District Standards adopted contemporaneously herewith by separate
County Ordinance No. O-2022-16; and,
WHEREAS, the County seeks to protect and preserve the natural environment and
to secure for its citizens quality, well planned and designed development and a stable and viable
tax base; and,
WHEREAS, the County finds that the program of development proposed by Owner for
this Property is consistent with the County’s comprehensive land use plan; and will further the
health, safety, welfare and economic well-being of the County and its residents; and,
WHEREAS, the program for development of the Property presents an opportunity for
the County to secure quality planning and growth to protect the environment and strengthen
and revitalized the tax base; and,
WHER
EAS, this Development Agreement is being made and entered between Owner
and the County, under the terms of the Act, for the purpose of providing assurances to Owner that
it may proceed with its development plan under the terms hereof, as hereinafter defined,
consistent with Jasper County Zoning Ordinance and the Planned Development District Standards
for the CSP Development (as herein defined) without encountering future changes in law which
would affect the ability to develop under the Jasper County Zoning Ordinance and the Planned
Development District Standards for the CSP Development Tract, and for the purpose of providing
important protection to the natural environment and long term financial stability and a viable tax
base to the County, and for the purpose of providing certain funding and funding sources to
assist the County in meeting the service and infrastructure needs associated with the
3
development authorized hereunder;
NOW THEREFORE, in consideration of the terms and conditions set forth herein, and
other good and valuable consideration, including the potential economic benefits to both the
County and Owner by entering into this Agreement, and to encourage well planned development
by Owner, the receipt and sufficiency of such consideration being hereby acknowledged, the
County and Owner hereby agree as follows:
I. INCORPORATION.
The above recitals are hereby incorporated into this Agreement, together with the
South Carolina General Assembly findings as set forth in Section 6-31-10(B) of the Act.
II. DEFINITIONS.
As used herein, the following terms mean:
"Act" means the South Carolina Local Government Development Agreement Act, as
codified in Sections 6-31-10 through 6-31-160 of the Code of Laws of South Carolina (1976), as
amended; incorporated herein by reference.
“Adjustment Factor” shall mean the greater of three percent 3% per annum or the annual
inflation factor supplied to local governments by the SC Department of Revenue and Fiscal Affairs
for use by local governments in determining allowable millage increases, such adjustment to be
applied on July 1
st of each year with the first adjustment being applied July 1, 2023.
“Agreement” shall mean this Development Agreement as amended by the County
and Developer in writing from time to time.
“Association” shall mean one (1) or more property owners’ associations established to
maintain portions of the Property, if such is ever formulated, which is not expected for that
portion(s) of the Property that is developed as rental units which are under single ownership, as
contemplated under the PDD.
4
“BJWSA” shall mean the Beaufort/Jasper Water and Sewer Authority, its successors or
assigns.
“Civic Fund” shall mean the segregated interest bearing Escrow Account into which all
Development Fees for Police, EMS and Fire are contributed pursuant to Section XI herein.
“Conceptual Master Plan” shall mean the Conceptual Master Plan adopted as part of the
Planned Development District Standards (“CSP PDD Standards”) by the County,.
“CSP PDD” means the Planned Development District for the CSP Development approved
by the County by Ordinance Number 0-2022-16, concurrently with its approval of this Agreement
“CSP PDD Standards” means the development standards applicable to the CSP PDD,
including the Conceptual Master Plan, as adopted by the County in connection with its approval of
the CSP PDD, attached hereto or incorporated by reference as Exhibit B.
“Current Legal Owner” means Paul H. Anderson, Emily A Tillman, and John F. Anderson,
who have contracted with Conduit Street Partners, LLC to sell the Property.
“County” shall mean Jasper County, South Carolina.
“DHEC” shall mean the South Carolina Department of Health and Environmental Control
“Developer” means the Owner, along with any and all successors in title, assigns or
lessees of the Owner who are transferred in writing from the Owner all or a portion of the
Development Rights under this Agreement and undertake Development of any portion of the
Property, as applicable in the context where such term is used.
"Development" means the development of portions of the Property as contemplated in
the Zoning Regulations.
“Development Fees” or “Developer Fees” shall have the meaning set forth in
Paragraph XI.
"Development Rights" means Development undertaken by the Owner or Developers in
accordance with the Zoning Regulations and this Development Agreement
5
“OCRM” means the South Carolina Office of Ocean and Coastal Resource Management
"Owner" means Conduit Street Partners, LLC, a Maryland limited liability company, its
corporate successors and any assignee, whereby such interest is assigned in writing to it by
Owner. Owner has a present equitable interest in the Property by virtue of a contract to purchase
with Current Legal Owner.
“Park Fund” shall mean the segregated interest bearing Escrow Account into which all
Development Fees for Parks are contributed pursuant to Section XI herein.
“CSP Development”, “CSP Tract” or “Property” means that certain tract of land
described on Exhibit A, as may be amended with the Agreement of the County and Owner.
“Project” means the Development that will occur within and upon the CSP Tract.
“Roadway Fund” shall mean the segregated interest bearing account into which all
Development Fees for Roads are contributed until utilized for public roadway improvements
pursuant to Section XI herein.
"Term" means the duration of this agreement as set forth in Section III hereof.
“Zoning Ordinance” means the Jasper County Zoning Ordinance adopted November
13, 2007, as amended through the Effective Date hereof, and attached hereto as Exhibit C and
incorporated herein by reference.
"Zoning Regulations" means the CSP PDD establishing a Planned Development District
for the Property, and all the attachments thereto, including but not being limited to the PDD
Conceptual Master Plan, all narratives, applications, and site development standards thereof (a
copy of all of which is attached hereto marked Exhibit B and/or incorporated herein by reference),
all as same may be hereafter amended by mutual agreement of the County and the Owner, this
Development Agreement, and the Jasper County Development Ordinance(s) being codified with
Municode© and current on Municode© through Supplement No. 3 as of June 21, 2021 as
amended through the Effective Date of this Agreement, except as the provisions thereof may be
6
clarified or modified by the terms of the CSP PDD and this Agreement, and all other applicable
statutes, ordinances and regulations governing uses and development of the Property.
III. TERM.
The term of this Agreement commenced on the date this Agreement was executed by the
County and Owner and terminates Five (5) years thereafter (“Termination Date”). This is the
maximum initial term permitted by law for the Property. Nothing in this Agreement shall be
interpreted to preclude the Parties from extending the Termination Date by mutual agreement or
from entering into subsequent development agreements.
IV. DEVELOPMENT OF THE PROPERTY.
The Property shall be developed in accordance with the Zoning Regulations and
this Agreement. All costs charged by or to the County for reviews required by the Jasper County
Zoning and Development Ordinance(s) shall be paid by the Owner or Developer or other party
applying for such review as generally charged throughout the County for plan review. The County
shall, throughout the Term, maintain or cause to be maintained, a procedure for the processing
of reviews as contemplated by the Zoning Regulations and this Agreement.
V. CHANGES TO ZONING REGULATIONS.
The Zoning Regulations relating to the Property subject to this Agreement shall
not be amended or modified during the Term, without the express written consent of the Owner
except in accordance with the procedures and provisions of Section 6- 31-80(B) of the Act,
which Owner shall have the right to challenge. Owner does, for itself and its successors and
assigns, including Developers and notwithstanding the Zoning Regulations, agrees to be bound
by the following:
1. The Owner shall be required to notify the County, in writing, as and
when Development Rights are transferred to any other party. Such information shall include
the identity and address of the acquiring party, a proper contact person, the location and number
of acres of the Property transferred, and the number of residential units and/or commercial
acreage and square footage of structure, as applicable, subject to the transfer. Developers
7
transferring Development Rights to any other party shall be subject to this requirement of
notification, and any entity acquiring Development Rights hereunder shall be required to file
with the County an acknowledgment of this Agreement and a commitment to be bound by it.
2. The Owners and Developers, and their respective heirs, successors and
assigns agree that all Development, with the exception of irrigation, incidental maintenance
facilities, and similar amenities which exist from time to time, and facilities existing at the date of
this Agreement will be served by potable water and public sewer prior to occupancy, except as
otherwise provided herein for temporary use, temporary being defined as one year or less.
Septic tanks and/or wells may be allowed with the permission of BJWSA where there is a
specific finding that such use for specific portions of the Property will comply with the overall
environmental standards.
VI. DEVELOPMENT SCHEDULE.
The Property shall be developed in accordance with the development schedule,
attached as Exhibit D, or as may be amended by Owner or Developer(s) in the future to reflect
actual market absorption. Pursuant to the Act, the failure of the Owner and any Developer to
meet the initial development schedule shall not, in and of itself, constitute a material breach of
this Agreement. In such event, the failure to meet the development schedule shall be judged by
the totality of circumstances, including but not limited to the Owners and Developer(s) good faith
efforts to attain compliance with the development schedule. These schedules are planning and
forecasting tools only and shall not be interpreted as mandating the development pace initially
forecast or preventing a faster pace if market conditions support a faster pace. The fact that
actual development may take place at a different pace, based on future market forces, is
expected and shall not be considered a default hereunder. Development activity may occur
faster or slower than the forecast schedule, as a matter of right, depending upon market
conditions. Furthermore, periodic adjustments to the development schedule which may be
submitted unilaterally by Owner / Developers in the future, shall not be considered a material
amendment or breach of the Agreement.
VII. DENSITY.
The criteria as set forth in Section II of the CSP PDD Standards shall apply with respect
to lot size, frontage, setbacks, impervious surface and height requirements, respectively, within the
8
Project. Residential density and types on the Property shall be the densities and types as set forth
in the CSP Planned Unit Development approval, Conceptual Master Plan, and as set forth
below:
1. Up to a maximum of 275 residential dwelling units may be constructed. The CSP
PDD and the CSP Conceptual Master Plan depict the expected mix and general location of allowed
residential units, however, so long as the total residential unit count does not exceed 275 units
and the general concept of development as shown on the Conceptual Master Plan is followed, the
Owner shall be allowed to alter location and product mix among all allowed uses under the PDD
at the time of Master Plan submittal when more specific design are available, based upon ongoing
project planning and market conditions.
2. Any such changes to exact location or product mix shall not be considered a
material amendment hereto, or an amendment to the attached PDD or the Conceptual Master
Plan, so long as the total allowed density is not exceeded and the use remains residential. Such
minor changes will be approved at the staff review level.
VIII. RESTRICTED ACCESS
The Owner and/or each Developer shall have the right (but not the obligation) to
create restricted access communities within the Property as long as such limited access does
not adversely affect in any material respect adjacent traffic patterns located on public rights-of-
way.
IX. EFFECT OF FUTURE LAWS.
Owner and Developers shall have vested rights to undertake Development of any
or all of the Property in accordance with the Zoning Regulations, as defined herein and modified
hereby, and as may be modified in the future pursuant to the terms of this Agreement for the
entirety of the Term. Future enactments of, or changes or amendments to the County ordinances,
including zoning or development standards ordinances, which conflict with the Zoning
Regulations shall not apply to the Property unless the procedures and provisions of §6-31-80
(B) of the Act are followed, which Owner shall have the right to challenge. Notwithstanding the
above, the Property will be subject to then current fire safety standards and state and/or
federal environmental guidelines standards of general application.
9
The parties specifically acknowledge that this Agreement shall not prohibit the
application of any present or future building, housing, electrical, plumbing, gas or other standard
codes, or any ad valorem tax of general application throughout the County, found by the
County Council to be necessary to protect the health, safety and welfare of the citizens of the
County.
X. INFRASTRUCTURE AND SERVICES
The County and Owner recognize that the majority of the direct costs associated
with the Development of the Property will be borne by the Owner and Developers, and many
other necessary services will be provided by other governmental or quasi-governmental entities,
and not by the County. For clarification, the parties make specific note of and acknowledge
the following:
A. Private Roads. All roads within the Property shall be constructed by the
Owner, Developer or other parties and maintained by such party(ies) and/or Association(s) or
dedicated for maintenance to other appropriate entities. The County will not be responsible for
the construction or maintenance of any private roads within the Property. The CSP
Development project shall have private roads designed to the standards reasonably acceptable
to the County Engineer. Road construction within SCDOT right of ways will be in accordance
with SCDOT standards. Roadway section details shall be submitted for review at the time of
development permit applications, as provided in the PDD.
B. Public Roads. All public roads outside the Property that serve the Property
are under the jurisdiction of the State of South Carolina or other governmental entities regarding
access, construction, improvements and maintenance. Owner acknowledges that it must comply
with all applicable state statues and rules and regulations of the South Carolina Department of
Transportation (“SCDOT”) or its successor regarding access and use of such public roads.
Future public roads may serve the Property. The County shall not be responsible for construction,
improvements or maintenance of the public roads which now or hereafter serve the Property,
unless it otherwise agrees in the future. Owner has engaged Bihl Engineering, LLC, of Charleston,
SC, to prepare a traffic impact analysis which has been submitted to the SCDOT for review and
comment. Subject to the approval of SDOT and any other the applicable jurisdictional authorities,
the Property is proposed to be served by direct access to the existing Brickyard Road and U.S.
10
Highway 278. Developer shall be responsible for construction of property access improvements
as recommended by SCDOT after review of the SCDOT required traffic study. Upon completion
of construction of any such improvements within the SCDOT right of way, and acceptance by
SCDOT, the SCDOT shall then maintain all roadway improvements within the public road right of
way.
C. Potable Water. Potable water will be supplied to the Property by BJWSA
or some other legally constituted public or private provider allowed to operate in the County.
The County shall not be responsible for any construction, treatment, maintenance or costs
associated with water service to the Property unless the County elects to provide such
services with the agreement of the applicable utility authority then providing such service to the
Property. Owner will construct or cause to be constructed all related infrastructure
improvements within the Property, which will be maintained by it or the service provider as
provided in any utility agreement between Owner and the service provider.
D. Sewage Treatment and Disposal. Sewage treatment and disposal will
be provided by BJWSA or some other legally constituted public or private provider allowed to
operate in the County. The County will not be responsible for any treatment, maintenance or
costs associated with sewage treatment within the Property, unless the County elects to
provide such service with the agreement of the applicable utility authority then providing such
service to the Property. Nothing herein shall be construed as precluding the County from
providing sewer services to its residents in accordance with applicable provisions of law. Owner
will construct or cause to be constructed all related infrastructure improvements within the
Property, which will be maintained by it or the provider as provided in any utility agreement
between Owner and the service provider.
E. Use of Effl
uent. Owner agrees that treated effluent will be disposed of
only in such manner as may be approved by DHEC and the BJWSA.
F. Police Services. County shall provide police protection services to the
Property on the same basis as is provided to other similarly situated residents and businesses
in the County. Owner acknowledges the jurisdiction the Sheriff of Jasper County on the Property
and shall not interfere or in any way hinder public safety activities on the Property regardless of
whether such may be a restricted access community. Should Owner desire an increased level of
service above the normal County level of police service, Owner shall be responsible for either
11
providing such services through the use of private security forces or shall pay the County’s direct
and indirect costs for providing such increased level of service.
G. Fire Services. County shall provide fire protection services to the Property
on the same basis as is provided to other similarly situated residents and businesses in the County.
Owner acknowledges the jurisdiction of the County’s fire department on the Property and shall
not interfere or in any way hinder public safety activities on the Property regardless of whether
such may be a restricted access community.
H. Sanitation Services. County will not provide sanitation services to any
properties with the Property. Should Owner desire such services, the Owner shall provide these
directly to the Property by a private licensed private contractor.
I. Recreation Services. County shall provide recreation services to the
Property on the same basis as it provides to other similarly situated residents and businesses in
the County.
J. Library Services. Such services shall be provided to residents on the
same basis as to all other citizens of the County.
K. Emergency Medical Services (EMS). Such services shall be provided to
residents of the Property on the same basis as to all other citizens of the County.
L. Drainage System. All stormwater runoff, treatment and drainage system
improvements within the Property will be designed in accordance with the Zoning Regulations
and Best Management Practices then current. All stormwater runoff, treatment and drainage
system improvements for the Property shall be constructed by Owner or the Association, as
applicable. The County will not be responsible for any construction or maintenance cost associated
with the stormwater runoff, treatment and drainage system within the Property.
M. Stor
m Water Quality. Protection of the quality in nearby waters and
wetlands is a primary goal of the County. The Owners shall be required to abide by all
provisions of federal, state and local laws and regulations, including those established by the
Department of Health and Environmental Control, the Office of Ocean and Coastal Resource
Management, and their successors for the handling of storm water. In addition to the water
quality safeguards as committed to by Owner above, notwithstanding Section IX hereof, Owner
12
and any developer shall adhere to any and all future ordinances or regulations of the County (or
portions thereof) governing detention, filtration, and treatment of storm water provided those
ordinances and regulations apply county wide, and are consistent with sound engineering
practices. Further provisions regarding Storm Water are included within the PDD for this Project.
XI. DEVELOPMENT FEES
1. To assist the County in meeting expenses resulting from ongoing
development, Owner shall pay development fees for Road, Civic and Parks (“Development Fees”)
as follows:
2.
DEVELOPMENT FEES
AMOUNT
Residential Dwelling Units
TOTAL FEE PER
RESIDENTIAL DWELLING
UNIT
$1,745 Net Roads Fee. See Section 3.
below.
$1,572.000 – Civic (Police, EMS and
Fire)
$1,683.00 – Park
$5,000.00
3. Net Roads Fee. The Net Roads Fee is calculated as the proposed Jasper
County gross Road Fee of $5,000 per unit, less an estimated per unit “public road improvement
credit” in the amount of $3,755. The “road improvement credit” represents a $1,000,000
estimate of costs of all external, off -site road improvements that will be borne by Owner at its
sole cost and expense in connection with the development of the project, including but not
necessarily limited to the construction of Highway 278 and Brickyard Road external roadway
improvements, divided by the estimated number of residential units that will be constructed
within the CSP PDD (265 units). The Net Road Fee is not intended to compensate the County
for the construction of any private road improvements within the CSP PDD, since all private
roads within the CSP PDD are to be constructed and maintained by Owner at Owner’s sole cost
and expense. Accordingly, no Development Fees for on-site, internal roads shall be collected.
13
4. All Development Fees for building permits issued to Owner
shall be collected at the time of issuance of an occupancy permit instead of at issuance of the
building permit. All Development Fees shall be placed in separate interest bearing accounts
established for Roads, Civic and Parks. The County may expend these funds for any purposes
designed to provide or enhance such services.
5. Notwithstanding any provisions to the contrary contained within this
Agreement, it is acknowledged Jasper County is in the process of considering the adoption of
Impact Fees as allowed by §6 -1-910, et. seq. of the South Carolina Code of Laws (1976, as
amended). The Property shall be exempt from any requirement to pay County Impact Fees under
any ordinance subsequently passed and enacted by the County, for the first five (5) years of the
Term of this Agreement as it may be extended by mutual agreement between the Owner and
County. In the event Impact Fees are adopted by the County, the Property shall be subject to
such fees provided they are applied uniformly to similar properties as this Property, and provided
further, that any Developer Fees paid by the Developer under Article XI (1), (2) and (3) shall be
credited against the Impact Fees to the extent the Development F ees are for items included in
the capital program incorporated in the formulation of the Impact Fees, or for the traffic
improvements on Highway 278 and Brickyard Road as recommended by the SCDOT as itemized
above.. It is further provided Owner and/or Developers shall be subject to the payment of any
and all present or future permitting fees enacted by the County that are of County wide application
and that relate to processing applications, development permits, building permits, review of plans,
or inspection (no other capital improvement related impact, development or other extractions)
6. Except as set forth in this Agreement, nothing herein shall be construed as
relieving the Owner, its successors and assigns, from payment of any such fees or charges as may
be assessed by entities other than the County, provided however, if an entity other than the County
is permitted by the County to impose fees or obligations similar in nature to those contemplated by
this Agreement, the Owner shall be entitled to either an offset against the Development Fees of
this Agreement the in the entire amount of such fees or obligations which are collected or an entire
credit against the other fees allowed to be collected. It is the intent of the parties that the fees and
obligations contemplated by this Agreement are the only obligations which will be imposed upon
the Property and that County shall not permit any other governmental authority to impose fees or
obligations of a similar nature to that which are contemplated by this Agreement without providing
14
for a credit against the other fees for the fees due under this Agreement; provided, however, the
provisions of this paragraph shall not preclude the County or another governmental authority from
imposing a fee of a nature which is for services or improve ments other than those contemplated
under this Agreement - (i.e., roads, fire/public safety), which are imposed on a consistent basis
throughout the area regulated by such governmental authority imposing such obligations. The
County or other governing body shall not be precluded by this Agreement from charging fees for
delivery of services to citizens or residents (i.e., an EMS response fee or the like), nor from charging
fees statutorily authorized in the future (i.e, a real estate transfer fee or the like) which are not
collected as a prerequisite to approval of a plat, plan or construction.
7. The fees set forth above in Article XI are vested for the entire Property
during the Term of this Agreement and shall not be increased. No other Development Fee shall be
imposed in connection with the Property, except as may be allowed pursuant to Article X and fees
set out in generally applicable ordinances such as building permitting fees and inspection fees.
The Civic, Park and Road Development Fees are subject to an annual inflation factor equal to
inflation factor as provided by the State of South Carolina to each local government for the
calculation of tax millage increases.
8. Any Development Fees paid and/or credits for Development Fees with
respect to property conveyed, services performed and/or money paid as provided in this
Agreement may be assigned by the Owner and/or Developer owning such credits and all such
credits, shall remain valid until utilized. The County shall recognize all such written assignments
of such rights and shall credit same against any Development Fees which are owned pursuant to
this Agreement.
9. Development Fees for on- site, internal roads shall not be collected. All internal
roads shall be constructed and maintained by Owner at Owner’s sole cost and expense.
10. All Net Road Fees shall be utilized in the discretion of the County, for traffic
and highway improvements as contained in the capital improvement program to be funded by the
proposed County impact fees, or other traffic and highway improvements to Highway 278 or Argent
Boulevard.
11. Owner agrees to pay the reasonable costs and expenses of the County’s
consultants and professionals incurred in negotiating, processing and evaluating this Agreement
and the accompanying PDD. County will provide sufficient documentation of these charges. Owner
15
shall pay such fees within 60 days of the delivery of the invoice(s).
XII. PERMITTING PROCEDURES:
1. The County agrees to allow the Developer the ability to permit and
construct model homes without utilities (i.e., “dry models”) and to relocate the models as necessary
within the CSP Tract.
2. The County agrees that the Owner and/or any Developer is not required
to phase development but shall have the right to do so.
3. The County agrees to review all land use changes, land development
applications, and plats in an expeditious manner in accordance with County regulations as
modified by the CSP PDD Standards for this Project. Plans will be processed in accordance
with the then current County PDD Plan and development plan procedural requirements.
Developer may submit these items for concurrent review with the County and other governmental
authorities. County may give final approval to any submission but will not grant authorization
to record plats or begin development construction activities until all permitting agencies have
completed their reviews.
4. Signage for the Project is governed by the provisions of the PDD for this
Project.
5. The County acknowledges that the Developer has the initial right of
architectural review regarding improvements and building upon the property subject to normal
review by the County Planning Commission. Developer shall be responsible for assuring such
modifications are in compliance the Zoning Regulations.
6. The Count
y agrees to allow plat recording with a financial security
instrument acceptable to the County prior to completion of infrastructure development and to
issue building permits prior to completion of such bonded infrastructure in accordance with the
Zoning Regulations as modified by the PDD Standards for this Property. However, rental or sale
and occupancy of completed residential dwellings shall not be allowed until
infrastructure for a particular phase of the Project is completed and public utilities are
accepted for service by the appropriate agency.
7. The County agrees the Property shall be governed by County Zoning
16
Regulations as in effect at the time of execution of this Agreement. If future codes are more
desirable to Property, then Developer may request the County to have such regulations become
applicable to any portion of the Project that Owner designates.
8. The County agrees that the Property is approved and fully vested for
intensity, density, development fees, uses and height, and shall not have any obligations for on
or off-site transportation or other facilities or improvements other than as provided in this
Agreement, but must adhere to the then current requirements of the CSP PDD Standards,
including, but not limited to the Conceptual Master Plan, and subdivision plat and development
plan procedural guidelines. The County may not impose additional development obligations or
regulations in connection with the ownership or development of the Property, except in
accordance with the procedures and provisions of § 6-31-80 (B) of the Act, which the Owner shall
have the right to challenge.
9. Roadways (public or private) may utilize swale drainage systems and are
not required to have raised curb and gutter systems, provided that pedestrian and non-vehicular
pathways or sidewalks are provided in residential areas and to provide interconnectivity
between interior subdivisions, commercial or institutional areas and public gathering areas.
Public Road Improvements are subject to the drainage requirements of the public agency having
jurisdiction and/or ownership . Roadway cross sections utilizing swale drainage will be designed,
constructed and maintained to meet BMP standards (imposed by regulatory agencies) for
stormwater quality. Roadway cross sections will be reviewed at time of proposed construction of
such Roadway based upon engineering and planning standards consistent with the CSP PDD
Standards prepared by Developer, subject to the approval of the County Planning Administrator.
10. All plan review fees shall be consistent with the fees charged generally in
the County.
XIII. DEVELOPER ENTITLEMENTS
County acknowledges that Developer is vested with the following items:
1. The County will, to the extent available, promote public transportation
which exists within the County to service the Property.
2. Intentionally Deleted
3. All drainage systems constructed within the CSP Development shall be
17
owned and maintained by the Owner, its assigns, or one (1) or more Association(s) which may
be established for various portions of the Property and the County shall have no responsibility for
the construction, operation or maintenance of such systems. Such systems shall be constructed
in compliance with any applicable federal, state or local requirements, utilizing the then current
Best Management Practices requirements.
4. On-site burning will be permitted within the Property upon obtaining any
applicable federal state or local permits.
5. The County agrees to cooperate with the Owner and each Developer with
county, state and federal roadway permitting in connection with the Development of portions of
the Property.
6. County services, including, but not limited to, police, fire, sanitation,
recreational parks and other governmental services shall be supplied to the Property in the
same manner and to the same extent as provided to other properties within the County, subject
to the limitations (if any) of Section X above. Subject to the limitations of Section X above (if any),
should the Owner require enhanced services beyond that which is routinely provided within the
County, then the County agrees that upon the written request of Owner, it shall negotiate in good
faith with the Owner to provide such enhanced services to the Property. Any enhanced services
shall be at the sole cost, if any, of the Owner.
XIV. COMPLIANCE REVIEWS.
As long as Owner owns any of the Property, Owner or its designee, shall meet
with the County, or its designee, at least once, per year, during the Term to review Development
completed by Owner in the prior year and the Development anticipated to be commenced or
completed by Owner in the ensuing year. The Owner, or its designee, shall provide such
information as may reasonably be requested, to include but not be limited to, acreage of the
Property sold in the prior year, acreage of the Property under contract, the number of certificates
of occupancy issued in the prior year, and the number anticipated to be issued in the ensuing
year, and Development Rights transferred in the prior year, and anticipated to be transferred
in the ensuing year. The Owner, or its designee, shall be required to compile this information
within a reasonable time after written request by the County.
18
XV. DEFAULTS.
The failure of the Owner, Developer or the County to comply with the terms of this
Agreement not cured within thirty (30) days after written notice from the non-defaulting party to the
defaulting party (as such time period may be extended with regard to non-monetary breaches for
a reasonable period of time based on the circumstances, provided such defaulting party
commences to cure such breach within such period and is proceeding diligently and expeditiously
to complete such cure) shall constitute a default, entitling the non-defaulting party to pursue such
remedies that are deemed appropriate, including specific performance; provided however no
termination of this Agreement may be declared by the County absent its according the Owner and
any relevant Developer the notice, hearing and opportunity to cure in accordance with the Act; and
provided any such termination shall be limited to the portion of the Property in default, and provided
further that nothing herein shall be deemed or construed to preclude the County or its designee
from issuing stop work orders or voiding permits issued for Development when such Development
contravenes the provisions of the Zoning Regulations or this Agreement.
Each Party recognizes that the other Party may suffer irreparable harm from a
material breach of this Agreement and that no adequate remedy at law may exist to enforce this
Agreement. Consequently, the Parties agree that any non-breaching Party who seeks enforcement
of the Agreement is entitled to seek the equitable remedies of injunction and specific performance.
However, if there is a dispute between the County and Owner, or its successor or assign,
concerning the terms, meaning, interpretation, rights or obligations under this Agreement (including
any determination of material breach under the Act), the Parties agree to submit such dispute to
prompt mediation before invoking legal proceedings. This pre- litigation mediation, conducted
pursuant to South Carolina Rules for Alternative Dispute Resolution with subsequent judicial action
lying in the Court of Common Pleas for Jasper County, South Carolina, shall be initiated by one
Party notifying the other Party or Parties in writing of the dispute together with a request for
mediation as described herein. The Parties agree that disputes under this Agreement not involving
the Jasper County, South Carolina Zoning Regulations are contractual matters, not appealable to
the Zoning Board of Appeals or the Planning Commission, but to the Court of Common Pleas for
Jasper County; however, matters involving the application of the Jasper County, South Carolina
Zoning Regulations are not contractual between the County and the Owner, but are subject to the
administrative review and appellate provisions involving the Zoning Board of Appeals or the
Planning Commission.
19
A default of the Owner shall not constitute a default by Developers, and default by
Developers shall not constitute a default by the Owner. Notwithstanding the foregoing, the failure
of the Owner to reasonably pursue the required permitting/approvals for and completion of required
traffic mitigation measures shall be grounds for the cessation of the issuance of development
permits for future sites; provided, however, that should the County Administrator determine that
there is a default by the Owner, he shall immediately notify the Owner in writing by certified mail,
return receipt requested, and allow the Owner fifteen (15) days to respond with an explanation of
why Owner is not in default or a plan for remedying the default. In the event the Owner presents a
plan of remediation for approval by the County Administrator, whose approval shall not be
unreasonably withheld, the parties shall agree to a commercially reasonable time to complete the
remediation plan, and during such time no negative action shall be taken against the Owner or
Developers. Failure to submit such a response or failure to subsequently pursue a plan of
remediation l may result in a moratorium on future development permits, a stop work order, and
any other consequences reasonably determined by the County Administrator. The parties
acknowledge that owners of completed buildings within the Project shall not be obligated for the
obligations of the Owner or Developer set forth in this Agreement, unless the Property remains
under unified ownership or unless such owners of completed buildings have been assigned any
rights under this Agreement. In such case, the owners of completed buildings shall also be
obligated for obligations set forth in this Agreement.
XVI. MODIFICATION OF AGREEMENT.
This Agreement may be modified or amended only by the written agreement of
the County and the Owner; such written agreement may be by resolution or ordinance at the
County’s sole discretion. No statement, action or agreement hereafter made shall be effective to
change, amend, waive, modify, discharge, terminate or effect an abandonment of this
Agreement in whole or in part unless such statement, action or agreement is in writing and signed
by the party against whom such change, amendment, waiver, modification, discharge,
termination or abandonment is sought to be enforced.
This Agreement may be modified or amended as to a portion of the Property only by the
written agreement of the County and the Owner of said portion of the Property. No statement,
action or agreement hereafter made shall be effective to change, amend, waive, modify,
20
discharge, terminate, or effect an abandonment of this Agreement in whole or in part unless
such change, amendment, waiver, modification, discharge, termination or abandonment is sought
to be enforced.
The Conceptual; Master Plan is not intended to be rigid, nor to identify exact site plans for
future development. The location of roads, buildings, recreational amenities and other elements
may vary at the time of permit applications when more specific designs are available, as long as
the maximum densities set forth herein and the general concept of environmentally sensitive
residential developments suggested by the Conceptual Master Plan is followed and
respected, however, reductions in buffers and setbacks in relation to external properties and
roadways are major modifications. Such minor variations are eligible to be approved at staff
level in accordance with the Zoning Regulations.
XVII. NOTICES.
Any notice, demand, request, consent, approval or communication which a
signatory party is required to or may give to another signatory party hereunder shall be in writing
and shall be delivered or addressed to the other at the address below set forth or to such other
address as such party may from time to time direct by written notice given in the manner herein
prescribed, and such notice or communication shall be deemed to have been given or made
when communicated by, i) immediately upon delivery if by personal delivery or by independent
courier service or by facsimile or, ii) if by mail on the fifth (5th) business day after the deposit
thereof in the United States Mail, postage prepaid, registered or certified or, iii) the day of
transmission by electronic mail transmission, if receipt is confirmed or a mailing is
made the day of transmission by United State Mail, addressed as hereinafter
provided. All notices, demands, requests, consents, approvals or communications shall be
given at the following addresses:
To Jasper County:
County Administrator
Jasper County
358 Third Avenue
Courthouse Square
Post Office Box 1149
Ridgeland, South Carolina 29936
Email: afulghum@jaspercountysc.gov
21
With Copy To: County Attorney
Jasper County
358 Third Avenue
Courthouse Square
Post Office Box 1149
Ridgeland, South Carolina 29936
Email: dtedder@jaspercountysc.gob
And to the Owner at: Conduit Street Partners, LLC
Peter Zadoretzky, Co-Managing Member
59 Franklin Street
Annapolis, Maryland 21401
Email: pzadoretzky@oapartners.com
With Copy To: Bouhan Falligant LLP
John D. Northup, III
One West Park Avenue
Savannah, Georgia 31401
Email: jdnorthup@bouhan.com
XVIII. ENFORCEMENT.
Any party hereto shall have the right to enforce the terms, provisions and
conditions of this Agreement (if not cured within the applicable cure period) by any remedies
available at law or in equity, including specific performance, and the right to recover attorney’s
fees and costs associated with said enforcement.
XIX. GENERAL.
A. Subsequent Laws. In the event state or federal laws or regulations are
enacted after the execution of this Agreement or decisions are issued by a court of competent
jurisdiction which prevent or preclude compliance with the Act or one or more provisions of this
Agreement ("New Laws"), the provisions of this Agreement shall be modified or suspended as
may be necessary to comply with such New Laws. Immediately after enactment of any such
New Law, or court decision, a party designated by the Owners and Developer(s) and the County
shall meet and confer in good faith in order to agree upon such modification or suspension
based on the effect such New Law would have on the purposes and intent of this Agreement.
During the time that these parties are conferring on such modification or suspension or
challenging the New Laws, the County may take reasonable action to comply with such New
Laws. Should these parties be unable to agree to a modification or suspension, either may
petition a court of competent jurisdiction for an appropriate modification or suspension of this
22
Agreement. In addition, the Owner, D evelopers and the County each shall have the right to
challenge the New Law preventing compliance with the terms of this Agreement. In the event
that such challenge is successful, this Agreement shall remain unmodified and in full force and
effect. Notwithstanding the foregoing, any adoption by the County of an ordinance assessing
Impacts Fees or their equivalent shall be governed by Article XII hereof.
B. Estoppel Certificate. The County, the Owner or any Developer may, at
any time, and from time to time, deliver written notice to the other applicable party requesting
such party to certify in writing:
(1) that this Agreement is in full force and effect,
(2) that this Agreement has not been amended or modified, or if so
amended, identifying the amendments,
(3) whether, to the knowledge of such party, the requesting party is in
default or claimed default in the performance of its obligations under this Agreement, and, if so,
describing the nature and amount, if any, of any such default or claimed default, and
(4) whether, to the knowledge of such party, any event has occurred
or failed to occur which, with the passage of time or the giving of notice, or both, would
constitute a default and, if so, specifying each such event.
C. Entire Agreement. This Agreement sets forth and incorporates by
reference all of the agreements. conditions and understandings among the County and the Owner
relative to the Property and its Development and there are no promises, agreements, conditions
or understandings, oral or written, expressed or implied, among these parties relative to the
matters addressed herein other than as set forth or as referred to herein.
D No Partnership or Joint Venture. Nothing in this Agreement shall be
deemed to create a partnership or joint venture between the County, the Owner or any Developer
or to render such party liable in any manner for the debts or obligations of another party.
E. Exhibits. All exhibits attached hereto and/or referred to in this
Agreement are incorporated herein as though set forth in full.
23
F. Construction. The parties agree that each party and its counsel have
reviewed and revised this Agreement and that any rule of construction to the effect that
ambiguities are to be resolved against the drafting party shall not apply in the interpretation of this
Agreement or any amendments or exhibits hereto. This Agreement should be construed so as to
effectuate the public purpose of settlement of disputes, while protecting the public health, safety
and welfare, including but not limited to ensuring the adequacy of public facilities and compatibility
between developed and undeveloped lands and their uses.
G. Assignment. Subject to the notification provisions hereof, Owner may
assign its rights and responsibilities hereunder to a subsidiary or sister company.
H. Governing Law. This Agreement shall be governed by the laws of the
State of South Carolina.
I. Counterparts. This Agreement may be executed in several
counterparts, each of which shall be deemed an original, and such counterparts shall constitute
but one and the same instrument.
J. Agreement to Cooperate. In the event of any legal action instituted by
a third party or other governmental entity or official challenging the validity of any provision of
this Agreement, the parties hereby agree to cooperate in defending such action; provided,
however, each party shall retain the right to pursue its own independent legal defense.
K. Eminent Domain. Nothing contained in this Agreement shall limit, impair
or restrict the County's right and power of eminent domain under the laws of the State of
South Carolina.
L. No Third Party Beneficiaries. The provisions of this Agreement may be
enforced only by the County, the Owner and Developers. No other persons shall have any rights
hereunder.
M. Contingencies. This Agreement is contingent on acquisition of the Property,
the approval of the Board of Directors of Owner and the County Council of the Jasper County,
South Carolina. Notwithstanding the above, Owner agrees to remain responsible for the payment
of the processing fees incurred by the County in reviewing and approving the Planned
24
Development District application and Development Agreement as set forth in Article XI (11) above.
N. Recording. Within fourteen (14) days after execution of this Agreement, the
Property Owner shall record the agreement with the Jasper County Register of Deeds. The
burdens of this Agreement are binding upon, and the benefits of this Agreement shall inure to, all
successors in interest and assigns of the Parties to this Agreement.
O. Agreement to Run with the Land. This Agreement shall be recorded
against the Property as described in Exhibit A attached hereto. The agreements contained
herein shall be deemed to run with the land. The burdens of this Agreement are binding upon,
and the benefits of the Agreement shall inure to, all successors in interest to the Parties to the
Agreement.
XX. SUCCESSORS AND ASSIGNS.
A. Binding Effect. This Agreement shall be binding on the successors and
assigns of the Owner in the ownership or Development of any portion of the Property or the Project.
A purchaser, lessee or other successor in interest of any portion of the Property shall be solely
responsible for performance of obligations hereunder as to the portion or portions of the Property
so transferred. Developers or other assignees of development tracts shall be required to execute a
written acknowledgment accepting and agreeing to perform the obligations in this Agreement, said
document to be in recordable form and provided to the County at the time of the recording of any
deed transferring a development tract. Following delivery of such documents, the previous Owner
shall be released of any further liability or obligation with respect to the obligations.
B. Transfer of Project . The Property Owner shall be entitled to transfer any
portion or all of the Property to a purchaser(s), subject to the following exceptions:
1. Transfer of Facilities and Service Obligations. Simultaneous with
the Owner conveying any portion of the Property to a third party, the Owner shall be
required to obtain a written agreement in substantially the same form as Exhibit F,
attached hereto and incorporated herein by reference, expressly assuming the
obligations with regard to the parcel conveyed and the potential Development of
same. The Owner shall notify the County within thirty (30) days after the conveyance
of the property, provide the County with the applicable documents assigning the
25
development obligations to the transferee and record the same in the office of the
Jasper County Register of Deeds.
2. Assignment of Development Rights. Any and all conveyances of
any portion of the Property subject to the intensities/square footage set forth in Article
VII herein to third party developers shall, by written agreement in substantially the
same form as Exhibit E, assign a precise number of residential units and/or
commercial/office square footage along with the permitted land uses that may be
constructed on the subject property being conveyed. The Owner shall notify the
County within thirty (30) days of the conveyance of the property, provide the County
with the applicable documents assigning the development rights to the transferee
and record the same in the Office of the Jasper County Register of Deeds.
3. Mortgage Lenders. Notwithstanding anything to the contrary
contained herein, the exceptions to transfer contained in this Section shall not apply:
(i) to any mortgage lender either as the result of foreclosure of any mortgage secured
by any portion of the Property or any other transfer in lieu of foreclosure; (ii) to any
third party purchaser at such a foreclosure; or (iii) to any third party purchaser of such
mortgage lender’s interest subsequent to the mortgage lender’s acquiring ownership
of any portion of the Property as set forth above. Furthermore, nothing contained
herein shall prevent, hinder or delay any transfer or any portion of the Property to
any such mortgage lender or subsequent purchaser. Notwithstanding the foregoing,
the obligations and restrictions arising under this Development Agreement run with
the land, and a foreclosure or subsequent transfer does not extinguish the obligations
and restrictions, arising hereunder, and such shall survive the foreclosure or
subsequent transfer. It is the intention of this subsection to merely for ego the
prerequisite notice of transfer documentation contained in subsections 1 and 2
immediately above.
C. Release of Property Owner. In the event of conveyance of all or a portion
of the Property and compliance with the conditions set forth herein, and specifically subsections
XX(B) (1) and (2), Conduit Street Partners, LLC shall be released from all obligations as to the
portion of Property so transferred, and the transferee shall be substituted as the Owner under the
Agreement as to the portion of the Property so transferred.
26
XXI. STATEMENT OF REQUIRED PROVISIONS
A. Specific Statements. The Act requires that a development agreement
must include certain mandatory provisions, pursuant to Section 6-31-60 (A). Although certain of
these items are addressed elsewhere in this Agreement, the following listing of the required
provisions is ser forth for convenient reference. The numbering below corresponds to the
numbering utilized under Section 6-31-60 (A) for the required items:
1. Legal Description of Property and Legal and Equitable Owners. The legal
description of the Property is set forth in Exhibit A attached hereto. The
present legal Owners of the Property are Paul H. Anderson, Emily A. Tillman
and John F. Anderson. Conduit Street Partners, LLC have an equitable interest
in the Property by virtue of a purchase agreement with the present legal
Owners.
2. Duration of Agreement. The duration of this Agreement shall be as
provided in Article III.
3. Permitted Uses, Densities, Building Heights and Intensities. A complete
listing and description of permitted uses, population densities, building
intensities and heights, as well as other development related standards, are
contained in Zoning Regulations, as supplemented by this Agreement. Based
on prior experience with the type of Development contemplated by the Zoning
Regulations, it is estimated that the average size household of the Project will
be 2.5 persons. Based on maximum density build out, the population density of
the Project is anticipated to be approximately 690 to 700 persons.
4. Required Public Facilities. The utility services available to the Property are
described generally above regarding water service, sewer service, cable
and other telecommunication services, gas service, electrical services,
telephone service and solid waste disposal. The mandatory procedures of
the Zoning Regulations will ensure availability of roads and utilities to serve the
residents on a timely basis.
27
5. Dedication of Land and Provisions to Protect Environmentally Sensitive
Areas. All requirements relating to land transfers for public facilities, if any,
are set forth above. The Zoning Regulations described above, and
incorporated herein, contain numerous provisions for the protection of
environmentally sensitive areas. All relevant State and Federal laws will be
fully complied with, in addition to the important provisions set forth in this
Agreement.
6. Local Development Permits. The Development standards for the Property
shall be as set forth in the Zoning Regulations. Specific permits must be
obtained prior to commencing Development, consistent with the standards set
forth in the Zoning Regulations. Building Permits must be obtained under
applicable law for any vertical construction, and appropriate permits must be
obtained from the State of South Carolina(OCRM) and Army Corps of
Engineers, when applicable, prior to any impact upon freshwater wetlands.
It is specifically understood that the failure of this Agreement to address a
particular permit, condition, term or restriction does not relieve the Owner, its
successors and assign, of the necessity of complying with the law governing
the permitting requirements, conditions, terms or restrictions, unless otherwise
provided hereunder.
7. Comprehensive Plan and Development Agreement. The Development
permitted and proposed under the Zoning Regulations and permitted under
this Agreement is consistent with the Comprehensive Plan and with current
land use regulations of the County, which include a Planned Development
District for the Property.
8. Term
s for Public Health, Safety and Welfare. The County Council finds
that all issues relating to public health, safety and welfare have been
adequately considered and appropriately dealt with under the terms of this
Agreement, the Zoning Regulations and existing laws.
9. Historical Structures. Any cultural, historical structure or sites will be
addressed through applicable federal and state regulations the permitting
28
process at the time of development, as required by applicable state regulations.
No such structures or sites are known to exist.
IN WITNESS WHEREOF, the parties hereby set their hands and seals, effective the
date first above written.
SIGNATURES AND ACKNOWLEDGMENTS BEGIN ON THE FOLLOWING PAGE
29
WITNESSES: CONDUIT STREET PARTNERS, LLC
By:
Peter Zadoretzky
Its: Co-Manager
STATE OF )
) ACKNOWLEDGMENT
COUNTY OF )
I HEREBY CERTIFY, that on this ______ day of , 2022. before me, the
undersigned Notary Public of the State and County aforesaid, personally appeared the duly
authorized official of Conduit Street Partners, LLC., known to me (or satisfactorily proven) to
be the person whose name is subscribed to the within document, who acknowledged the due
execution of the foregoing document.
IN WITNESS WHEREOF, I have hereunto set my hand and official seal the day and
year last above mentioned.
Notary Public for Maryland
My Commission Expires:
30
WITNESSES: JASPER COUNTY, SOUTH CAROLINA
_______________________________ By: _____________________________
Barbara B. Clark
Its:
STATE OF SOUTH CAROLINA. )
) ACKNOWLEDGMENT
COUNTY OF JASPER )
I HEREBY CERTIFY, that on this day of , 2022. before me,
the undersigned Notary Public of the State and County aforesaid, personally appeared
Barbara B. Clark, Chair of Jasper County Council , known to me (or satisfactorily proven) to be
the person whose name is subscribed to the within document, as the appropriate officials of
the County of Jasper, South Carolina, who acknowledged the due execution of the foregoing
document.
IN WITNESS WHEREOF, I have hereunto set my hand and official seal the day
and year last above mentioned.
Notary Public for South Carolina
My Commission Expires:
31
EXHIBIT A
TO DEVELOPMENT AGREEMENT
PROPERTY DESCRIPTION OF CSP DEVELOPMENT TRACT
32
33
EXHIBIT B-1
TO DEVELOPMENT AGREEMENT
PLANNED DEVELOPMENT DISTRICT
The Planned Development District approval for CSP Development (the Property
hereunder), as adopted in Ordinance O - 2022- 16by the Jasper County
Council on June 27, 2022, is hereby incorporated herein by reference, to include all drawings,
plans, narratives and documentation submitted therewith, as fully as if attached hereto. The
parties hereto may elect to physically attach said documents hereto, or may rely upon the above
stated incorporation by reference, at their discretion.
34
EXHIBIT B-2
TO DEVELOPMENT AGREEMENT
CONCEPTUAL MASTER PLAN
35
36
EXHIBIT C
TO DEVELOPMENT AGREEMENT
ZONING REGULATIONS
1. The Jasper County Zoning Ordinance, being codified with Municode© and current on
Municode© through Supplement No. 3 as of June 21, 2021 as amended through the
Effective Date of this Agreement
2. The Planned District Development (PDD) Conceptual Master Plan dated January 27,
2022 and adopted by Jasper County by Ordinance Number O-2022-16.
37
EXHIBIT D
TO DEVELOPMENT AGREEMENT
DEVELOPMENT SCHEDULE
Development of the Property is expected to occur over the five (5) year term of the
Agreement, with the sequence and timing of development activity to be dictated largely
by market conditions. The following estimate of expected activity is hereby included,
to be updated by Owner as the development evolves over the term.
Type of Development Year(s) of Commencement / Completion
Rental and/or For Sale 2024 commencement,
Residential Single Family expected buildout 2027
As stated in the Development Agreement, Article VI, actual development may occur
more rapidly or less rapidly, based on market conditions and final product mix.
PDD EXHIBIT A-2 “REDLINE”
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
TABLE OF CONTENTS
APPLICANT AND PLANNING TEAM……………………………………………………………………………………. 1
SECTION I – INTRODUCTION AND NARRATIVE………………………………………………………………… 2
A. The Property………………………………………………………………………………………………………………….. 2
B. Planned Development District Process……………………………………………………………………….. 3
C. Conceptual Master Plan………………………………………………………………………………………………… 4
D. Environmental Protection………………………………………………………………………………………………. 5
E. Water and Sewer Service……………………………………………………………………………………………… 5
F. Utility Service…………………………………………………………………………………………………………………… 5
G. Roadways and Traffic…………………………………………………………………………………………………….. 5
H. Tree Preservation and Replacement……………………………………………………………………………. 6
I. Parking…………………………………………………………………………………………………………………………….. 7
J. Stormwater Management………………………………………………………………………………………………. 7
K. Cultural and Historical Resources…………………………………………………………………………………. 7
L. Emergency Services………………………………………………………………………………………………………. 7
SECTION II – LAND USE DESIGNATION AND DEFINITIONS……………………………………………… 8
A. Introduction and Narrative………………………………………………………………………………………………. 8
B. Allowed Land Uses………………………………………………………………………………………………………….. 8
C. Allowed Density and Transfer of Density Between Planning Areas …………………………… 9
D. Definition of Land Use Terms and Density Terms ……………………………………………………….. 9
SCHEDULE OF EXHIBITS:
Exhibit A Site Location Map Exhibit I FEMA Flood Zones
Exhibit B Conceptual Master Plan Exhibit J BJWSA Availability to Serve Letter
Exhibit C Property Aerial Exhibit K Dominion Availability to Serve Letter
Exhibit D-1 Jasper County Zoning Map Exhibit L Palmetto Availability to Serve Letter
Exhibit D-2 Hardeeville Zoning Map Exhibit M Hargray Availability to Serve Letter
Exhibit E Wetlands Deliniation Exhibit N Archaeological Report
Exhibit F Boundary Survey Exhibit O Concept Development Schedule
Exhibit G USDA Soils Data Exhibit P Fire Station and EMS Locations
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 1
Exhibit H Topography Exhibit Q Thomas & Hutton Traffic Memo
APPLI
CANT AND PLANNING TEAM
Owner………….………………………………………………………………………………………….Paul H. Anderson, Emily A.Tillman
& John F. Anderson
Developer / Applicant……………………………………..………………………………………………Conduit Street Partners, LLC
Annapolis, MD
Mr. Peter Zadoretzky
Land Planner and
Engineer………………………………………………………………………..Thomas & Hutton Engineering
Savannah, GA
Mr. Lamar Mercer, P.E.
Mr. Scott Monson, P.E
Carolina Engineering Consultants, Inc
Beauf ort, SC
Mr. Jeff P. Ackerman, P.E
Wetl
ands / Environmental Consultant and Permitting…………….Newkirk Environmental Consultants, Inc.
Beaufort, SC
Mr. Ashley Howell
Archaeo
logist……………………………………….………………………………………..…………….Brockington & Associates, Inc.
Savannah, GA
Mr. Alex Sweeney, MA, RPA
Land Use
Attorney / Legal Counsel……………………………………………………..…………………..Bouhan Falligant LLP
Savannah, GA
John D. Northup III, Esq.
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 2
CSP DEVELOPMENT
PLANNED DEVELOPMENT DISTRICT
AND
CONCEPTUAL MASTER PLAN
SECTION I:
INTRODUCTION AND NARRATIVE
The Conduit Street Partners, LLC project currently consists of one parcel located in Jasper
County, SC. Currently, the parcel is zoned Rural Preservation (“RP”) and is identified as PIN no.
041-00-03-030. The property is approximately 38.84 acres with substantial frontage on the north
side of U.S. Highway 278 situated between the Hilton Head Lakes North development to its east
and the Prime Storage facility to its west. The property is surrounded by City of Hardeeville land
nearly all of which is zoned PDD with a very small area zoned GC (the Prime Storage property).
The property has been in the Anderson Family estate for many years and was originally part of
the J.A. Coleman Estate. Exhibit A Site Location Map is attached.
The property
is under agreement to be purchased from the Anderson family members by the
Applicant, Conduit Street Partners, LLC, who are pursuing a new PDD zoning encompassing all
the parcel to allow for the property to be deve loped under the stipulations set forth by the
proposed PDD zoning in accordance with the Jasper County Zoning Ordinance (ZO) and Land
Development Regulations (LDR) in effect at the time of submittal of this rezoning application .
Upon approval, the benefits of the proposed PDD Standards shall apply to the Applicant I Owner
and its successors and assignees. For the purposes of the P DD and Exhibit B Concept ual
Master Plan, the parcel is hereby known as a single project ( “CSP Development ”) in this
document henceforth.
A. THE PROPERTY
1. The CSP Development property is a raw, unimproved forested , predominately uplands
parcel in Jasper County. There are no nor have there ever been any existing buildings, structures,
or other facilities on the property. The property is surrounded by PDD zoned Hardeeville land to
its east, north and south and by Hardeeville GC zoned land to its west. It is bounded on its eastern
side by the Hilton Head Lakes North development – a large, golf course residential community
and one of the initial phases of the Hardeeville West Argent PDD development project. To the
north and contiguous to the CSP Development is an undeveloped, principally forested, and
regulated wetlands parcel which is also part of the West Argent PDD development project. West
of the property is an existing Prime Storage facility situated on land located in Hardeeville and
zoned GC. The southern property line of the property is frontage along the north side of highway
U.S. 278 – a four lane divided, center median, limited access highway. And on the other/south
side of U.S. 278 across the highway from the CSP Development there are two major Hardeeville
PDD land parcels. One of the parcels is a part of the existing Latitude Margaritaville development
and is at the present time planned to be Margaritaville’s future 70-acre retail/commercial phase.
The second parcel that is to the west and contiguous with the Latitude Marga ritaville land is
another very large Hardeeville PDD land parcel known as the Morgan PDD project . Both land
tracts on the south side of U.S. 278 immediately across the highway from the proposed CSP
Development are raw, unimproved but PDD zoned properties with existing Hardeeville
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 3
development agreements. Combined, the West Argent PDD, the Latitude Margaritaville PDD and
the Morgan Tract PDD amount to approximately 10,500 acres of Hardeeville development parcels
zoned PDD. The CSP Development 38.84-acre parcel has just under 2,700 feet of frontage along
the north side of U.S. 278 and will access this highway at one central location in alignment with
an existing median break. The CSP Development property will also have access to existing
Brickyard Road at the road’s eastern termination point which is located at the property’s western
property line. A Property Aerial (Exhibit C), a Jasper County Zoning Map (Exhibit D-1) and a
Hardeeville Zoning Map (Exhibit D-2) are provided.
2. The proposed PDD consists of approximately 38.84 acres and has an anticipated area of
approximately 37 acres of uplands and approximately 1.5 acres of jurisdictional wetlands, and 0.5
acres of non- jurisdictional wetlands (excluded waters – gum pond) based upon a preliminary
wetland exhibit prepared by Newkirk Environmental, dated December 2021 (see Exhibit E
Wetlands DeliniationDelineation). The delineation of the wetlands within the property have
been submitted to the Army Corps of Engineers to obtain a valid Jurisdictional Determination. The
Conceptual Plan has taken into account the jurisdictional wetlands and has avoided any
development impacts to these areas. The property does not have any critical area or frontage on
salt marsh or creeks.
3. Exhibit
F Boundary Survey depicts the property boundary.
4. Exhibit
G USDA Soils Data depicts soils types of the property
.
5. Exhibit H Topography depicts topographic information for the CSP Development
property. GIS data topography was used for the purposes of the exhibit. Elevations on the site
range from elevation 10.0 along its northern edge sloping quickly upwards to the property’s interior
where grades are relatively flat averaging between elevations 18.0 to 20.0 with two small knolls
on the west end of the property averaging elevation 24.0. Exhibit I FEMA Flood Zones Map
depicts the 2019 FEMA flood zones which indicate that the property is in FEMA zone “X” which
is defined to be an area of minimal flood hazard generally above or outside the 500- year flood
level. Finished floor elevations of building structures will adhere to current Flood Zone
requirements of the Jasper County Land Development Regulations.
B. PLANNED DEVELOPMENT DISTRICT PROCESS
1. The Planned Development District (P DD) was established by the Jasper County to
encourage flexibility in the development of land to promote its most appropriate, economical, and
efficient use as well as to encourage creative design and produce a better environment
particularly for large undeveloped tracts. The purpose of the PDD is to, among other things, permit
development for specialized purposes which are planned and developed on a unified basis. In
this case the specialized purpose is a first-class Single-Family Rental Home (“SFR”) community
as proposed by Conduit Street Partners, LLC . The homes themselves will be of unique design,
tasteful architecture and generally resemble residential cottage, villa and/or patiosingle family
detached and townhouse home types. The community will be under one owner ship structure
which will maintain most all aspects of the community, i.e., its infrastructure including its roads ,
the interior and exteriors of the homes and the grounds on which they are constructed including
the community amenities and open spaces.
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 4
C. CONCEPTUAL MASTER PLAN
It i
s anticipated that the Conduit Street Development property will be developed over a period of
no more than four to five years in as many as two phases in accordance with the Conceptual
Master Plan as set forth in this document and as the same may be supplemented by subsequent
master and development plans submitted pursuant to the provisions of this PDD (see Exhibit N
Concept Development Schedule). The Conceptual Master Plan sets forth the general scope of
the development including number of allowed units , development standards, infrastructure
requirements, and other guidelines. In addition to the Conceptual Master Plan, development of
the Property will be controlled by other provisions of the PDD.
The goal o
f this PDD is to produce a development that raises the quality of life and development
standards in the area while also anticipating the County’s existing and future needs for naturally
affordable single-family homes.
The Conduit St
reet Development Conceptual Master Plan displays a general and privately owned
and maintained roadway layout , general housing unit layout , open space areas as well as
amenities that will serve the property. The final l ocations of these site elements may vary at the
time of development permit. Proposed land uses in the development are detailed under Section
2 - Land Use Designation and Definitions.
The Conceptual
Master Plan seeks to maintain open space requirements set forth in Section II,
D.3 of this PDD. The open space and amenities will be owned and maintained by the Applicant I
Owner, or other legally designated entity. Property deeded to a governmental or private utility
entity will be the maintenance responsibility of that entity.
The Conceptual Master Plan and the provisions of this P DD will constitute the zoning for the
Property and a waiver from the current Jasper County codes and regulations where differences
occur. However,, activities in the PDD shall conform to all other Jasper County Zoning Ordinance
and Land Development Regulations where differences do not occur.
The provi
sions of the Conceptual Master Plan shall apply to development of the property. In the
event of a conflict , the hierarchy of documents will be the “to be approved”, (i ) Development
Agreement (DA), (ii) the PDD and Conceptual Master Plan and, (iii) the Master Plan (MP).
D. ENVIRONMENTAL PROTECTION
1. As part of the development process , the CSP Development will meet or exceed the
stormwater management requirements of Jasper County, and the requirements of South Carolina
Department of Health and Environmental Control (DHEC) and Office of Ocean and Coastal
Resource Management (OCRM) .The Applicant I Owner will prepare stormwater management
plans for the project as it is developed in acc ordance with a stormwater drainage master plan to
be prepared by a professional engineering firm licensed by the State of South Carolina. The
stormwater drainage master plan will address the hydrological characteristics of the entire site as
well as adjacent drainage patterns of relative importance. The plan will address pre-development
conditions and post -development stormwater management for flood control and sediment
reduction. This plan will also address storm water quality through, among other things, the use of
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 5
several types of BMP's (as established by the stormwater standards of the applicable state and
federal governmental regulations) to enhance water quality and protect the adjacent wetlands.
2. Approximately 4 percent of the site consists of regulated jurisdictional wetlands. Exhibit E
is a preliminary wetland plan prepared by Newkirk Environmental dated December 2021 which
depicts the preliminary observation of wetlands vs uplands for the project area. The wetland plan
has been submitted to the Army Corps of Engineers to obtain a jurisdictional determination prior
to development of the property.
3. There will be no development impacts to the regulated jurisdictional wetlands. Subject to
the approval of the Office of Ocean and Coastal Resource Management, the CSP Development
will seek to remove/fill the non-regulated “gum pond” located in proximity to the project’s proposed
main entrance off highway U.S. 278.
E. WATER AND SEWER SERVICE
Water and se
wer service will be provided to the CSP Development by Beaufort Jasper Water and
Sewer Authority. Preliminary planning for the water and sewer systems will be provided at the
time of Initial Master Plan subm ittal to Jasper County. Preliminary discussions with Beaufort -
Jasper Water and Sewer Authority (BJWSA) indicate a willingness to serve the property. BJWSA
operates and maintains water and sewer systems within their service area upon completion by
the developer and acceptance by the Authority. See Exhibit J BJWSA Availability to Serve
Letter.
F. UTILITY SERVICE
1 . The CS
P Development property is in the service territory of Dominion Energy tor natural
gas services, See Exhibit K Dominion Energy Availability to Serve Letter . The Applicant I
Owner will coordinate with Dominion Energy regarding planning for the CSP Development project.
2. The CSP D
evelopment property is in the service territory of Palmetto Electric Cooperative
tor electric services, See Exhibit L Palmetto Availability to Serve Letter. The Applicant I Owner
will coordinate with Dominion Energy regarding planning for the CSP Development project.
3. Hargray
or/or another licensed provider will provide internet and communication services
to the CSP Development property . The Applicant/Owner will coordinate with the provider
regarding planning and installation of these services. All servicing is anticipated to be via f iber
optics cable to include broadband capability. See Exhibit M Hargray Availability to Serve
Letter.
4. Othe
r Utility services shall be provided by legally established ent ities at the discretion of
the Applicant I Owner, provided such are in accordance with the franchising ordinances/licensing
with the County.
5. Utilities
will be underground except as reasonably necessary for above ground support
facilities.
G. ROADWAYS AND TRAFFIC
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 6
1. The CSP Development PDD shall have on-site roads designed and constructed to the
standards of the Jasper County Land Development Regulations or other engineering standards
reasonably acceptable to the Jasper County Engineer. Roadway construction within SC DOT
right-of-way's will be in accordance with SCD OT standards. Roadway section details wil l be
submitted for review at time of development permit approval. Interconnectivity to other adjoining
tracts of land is not proposed. Public access into or across other private developments will not be
required. Roadway design standards may be modified subject to the approval of Jasper County
to reduce environmental impacts provided safety concerns are not compromised. All onsite roads
shall be privately owned and maintained.
2. The A
pplicant I Owner intends to create up to three new points of vehicular access to
existing public roads and highways for the project . The first is proposed to be a main entrance
ingress and egress to U.S. 278 located and aligned with the center most existing highway median
cut. The second access location i s anticipated to provide ingress and egress to U.S. 278 at the
highway’s median cut fronting the eastern end of the property. The third point of vehicular
connectivity is planned as a proposed connection with existing Brickyard Road at the roads point
of termination at the property’s western property line and adjacent to the U.S. 278 right-of-way. A
traffic plan study will be provided at the Master Plan stage. The traffic study shall be reviewed by
the SCDOT and final configuration for the new accesses will be governed by the SC DOT. Final
entrance configuration and locations w ill be based upon SCD OT guidelines at the time of
development permit.
3. Acces
s to the CSP Development PDD may be restricted and/or gated appropriately at
the Applicant I Owner's discretion. Sidewalks and possibly trails shall be provided within the PDD
at appropriate locations. The frequency and location of sidewalks or pathways shall be
established based upon anticipated pedestrian circulation within the project. Sidewalks and trails
shown on the Conceptual Master Plan are conceptual in nature and are subject to change over
the course of the development permit process.
4. Notwi
thstanding the provisions of section G hereof, roadway design standards may be
modified to reduce environmental impacts provided safety concerns are not compromised. To
protect and preserve significant natural property attributes including avoiding wetland impacts,
such design will be encouraged.
5. Referenc
e Thomas & Hutton Traffic Memo Exhibit Q for preliminary traffic analysis and
commentary concluding no material traffic impacts to existing road systems.
6. TREE P
RESERVATION AND REPLACEMENT
The CSP
Development shall meet or exceed the minimum allowable post development tree
coverage requirements of Jasper County . Trees required and/or worthy of preserving shall be
incorporated into buffer areas around jurisdictional wetlands , in required buffer yards and in the
required Highway Corridor Overlay District 50’ buffer parallel and adjacent to the U.S. 278
Highway.
In those c
ases where the minimum allowable tree coverage cannot be met by preservation within
a required buffer area, replacement trees shall be planted to meet the tree types and quantities
as required by code. Trees to be preserved in buffer areas shall be identified and located by a
tree survey within the CSP Development PDD.
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 7
Plantings, including trees, situated in any buffer area shall be maintained in good health and any
dead or damaged plants will be replaced. And if any tree in a buffer is severely damaged due to
weather or other reasons, all severely damaged trees shall be replaced no later than the end of
the next dormant season.
I. PARKING
Parking for the CSP Development community shall be provided by a combination of attached
and/or detached residential parking garages and their corresponding driveways, and community
surface parking lots for overflow parking, the community amenity areas and leasing offices . All
parking shall be generally consistent with Jasper County development standards or as otherwise
proposed by the Applicant/Owner and approved by Jasper County.
J. STORMWATER MANAGEMENT
The CSP Development PDD shall conform to the Stormwater Management Provisions of the
Jasper County Land Development Standards including but not necessarily limited to the Jasper
County Stormwater Management Design Manual and applicable state and federal requirements.
Among other things, the post-development peak runoff discharge rate for the 2-, 10- and 25-year,
24-hour design storm events will be designed to control these rates to pre-development discharge
rates. Additionally, the CSP Development PDD shall design its stormwater system to manage a
100-year, 24-hour storm event without causing damage to on-site and offsite structures. Sufficient
stormwater best management practices will be employed in the development of the P DD to
ensure runoff leaving the site does not degrade water quality of the surrounding receiving waters.
K. CULTURAL AND HISTORICAL RESOURCES
As part of a comprehensive study of the property a Phase I and Phase II archeological
investigations and studies were conducted by Brockington & Associates. The investigations have
concluded that there are no archeological sites eligible for the National Register requiring
preservation or management considerations on the property. Exhibit N Archaeological Report
is attached.
L. EMERGENCY SERVICES
Fire and emergency medical services will be provided to the residents of the CSP Development
by no less than two Jasper County Fire-Rescue stations which are located less than 5 miles from
the property. FIRE STATION AND EMS LOCATIONS EXHIBIT P is attached identifying Jasper
County Fire Stations 34 and 35 and their distances (each less than 5 miles) and times in route to
the CSP Development.
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 8
SECTION II:
LAND USE DESIGNATION AND DEFINITIONS
A . INTRODUCTION and NARRATIVE
The Conceptual Master Plan consists of an area of approximately 38.84 acres. The proposed
predominate uses shall include but not be necessarily limited to:
• For-Rent Single Family Residential situated on an uns ubdivided parcel(s) and/or on
subdivided individual platted lots
• Single Family For Sale Residential situated on subdivided individual platted lots
• Active and passive community amenity areas
• Model homes and leasing and sales centers
• Site infrastructure
The land use areas indicated on the Conceptual Master Plan are not intended to be rigid exact
boundaries for future improvements. The Conceptual Master Plan PDD for the CSP Development
shall maintain flexibility to accommodate specific soils conditions, environmental concerns,
physical constraints, market conditions and design parameters and as such, the exact location of
boundary lines and any proposed buildings or structures, between land uses and their subsequent
location and size indicated within the planning area shall be subject to change at the time of the
Master Plan Phase and Development Permit Plan submission; provided that maximum densities
and other conditions of the Development Agreement between the Applicant / Owner and Jasper
County, South Carolina will be adhered to strictly, unless adjustments are requested by the
Applicant / Owner and approved by Jasper County.
All rental residential dwelling units shall be owned, controlled and maintained by the Applicant or
its assigns or successors which units may be located on an unsubdivided parcel or individual
platted lots., amenitiesAmenities, on-property infrastructure and improvements not dedicated or
otherwise conveyed to public or private third parties (such as a homeowner’s association) shall
beshall be owned, controlled and maintained by the Applicant / Owner or its successors.
If at any time in the future rental homes that are situated on subdivided platted lots are sold and
owner occupied, these housing units shall be owned, controlled, and maintained by their
individual owners.
B. ALLOWED LAND USES
The following land uses shall be permitted in the CSP Development PDD. The purpose of this
portion of the PD D document is to state which land uses shall be allowed within the CSP
Development PDD and to clearly define development within the area. However, by allowing these
uses this does not obligate the Applicant / Owner to provide all of the uses or facilities herein. The
allowed land uses and definitions shall be as follows:
For-Rent and/or For Sale Single Family Residential
• For-Rent Single Family Residential Dwelling - A detached or attached home used
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 9
exclusively for residential purposes which is either (i) leased to its tenant(s) located on a
single parcel of unsubdivided land or on subdivided platted landlots and/or (ii) detached
or attached homes sold to buyers/homeowners which homes shall be located on single
subdivided platted lots . Dwelling units may have either private or shared access. Units
may be arranged in a variety of configurations including detached, attached, back-to-back,
side to side, vertical or any combination thereof.
• Home Sites - Individual un-platted parcels or individual platted sites lots available for short
or long-term lease for the rental homes or for owner occupied homes.
• Amenity Areas - including Club House / swimming pool / playground / bocce ball / cornhole
/ horseshoes / oyster tables / pickleball and tennis courts / amphitheater / fitness facility
or other recreational amenities.
• Mail kiosks including drone delivery station(s)
• Utilities
• Recreational Amenity Uses such as, but not limited to:
o Dog park
o Multi-use field(s)
o Gazebo
o Kayak, canoe and boat storage areas
o Trails or sidewalks
o Bike paths
o Mini-golf and/or golf putting green
o Pavilion
o Grilling areas
o Common open space and other active and passive recreational uses
o Maintenance Areas or Buildings
o Planting/vegetable garden(s)
Design Standards and Regulations may be establ ished for each area and use at the time of
development permit, unless agreed at development permit approval or in this PDD, the standard
for uses from the Jaser County Land Development Regulations shall apply.
Any easement that occurs within the property shall have the same land uses as any of the
adjacent land uses. Any restrictions shall be based on the legal definition of the easement.
C. ALLOWED DENSITY WITHIN PLANNING AREAS
1. Preliminary planning for the Property contemplates the For-Rent Residential land uses
{including wetlands) for the entire property as depicted on the Conceptual Master Plan. The
Conceptual Master Plan layout may be modified at the time of development permit application.
2. The total project is allowed a maximum of 275 For-Rent, Single Family Dwelling Units.
The maximum size per dwelling unit shall be 2,500 square feet. The minimum dwelling unit shall
be 800 square feet. The size and configuration of anticipated dwelling u nits displayed on the
Conceptual Master Plan may be modified at the time of development permit. The submitted
Conceptual Site Plan presently indicates 265 For-Rent, Single Family Dwelling Units.
3. Overall residential density may include both Attached and Detached Single Family
Residential dwelling units.
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 10
D. DEFINITIONS OF LAND USE TERMS AND DENSITY TERMS
In the absence of a term definition in this Conceptual Master Plan or in the proposed CSP
Development PDD with Jasper County, the definitions of the Jaser County Land Development
Regulations shall apply in the interpretation of this Conceptual Master Plan. The definitions below
shall generally describe the allowed uses and terms within the CSP Development PDD.
1. Acre
a. Gross Acre shall mean the entire acreage within the site boundaries.
b. Net Acre shall mean the acre which remains after deduction of easements for
existing utilities, wetland buffers, and onsite wetlands.
2. Maintenance Areas
The maintenance areas w ill contain the facilities , tools, and equi pment necessary to
maintain the common properties and amenit ies within the CSP Development PDD.
These facilities may be congregated on a central site or located in separate convenient
sites for different services such as general community mai ntenance, recreation area
maintenance or individual property regime maintenance.
Permitted uses include:
a. Storage of vehicles and parts , boats, recreational vehicles . tools, supplies, and
resident storage.
b. Offices associated with community and maintenance.
3. Open Space
Total open space for the Property shall be calculated for the boundary of the Property
and not on a s ite-specific basis for each par cel or phase of the Property , individual
development. or project. The Property shall provide at least 10% open space. Open
space shall be calculated based upon the total gross acreage. Open space shall consist
of the following:
a. Landscape s urface areas (areas not covered by buildings , parking.
impervious surface) including manicured village greens or equivalent
b. Lagoons, ponds, impoundments, and lakes (detention, retention, or
recreational)
c. Freshwater wetlands
d. Wetland buffers
e. Forest, wildlife preserves / corridors, conservation areas and greenbelts
f. Community Park, amenity areas and community garden plots
g. Recreation areas includi ng swimming pools, tennis courts, playgrounds ,
multi-purpose fields, lawn games, gardens, etc.
h. Pedestrian / bicycle trails /paths /nature trails
i. Perimeter buffers
4. Setbacks, Lot Sizes and Buffers
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 11
a. There shall be no minimum setbacks applied to the CSP Development PDD
unless noted otherwise in this PDD document. Setbacks and buffers sha ll
meet the minimum requirements established herein, and except as set forth
in this P DD Standards, s hall apply to the pe rimeter of the P DD on ly
provided, however, that any requi red wetlands buffers shall apply
according to law throughout the Property.
b. Setbacks /buffer areas shall be provided for jurisdictional wetlands within
the PDD. Setbacks / buffers for wetlands shall be 25 feet .
c. Perimeter buffer standards shall include:
(i) At adjacent property boundaries to the east and to the north of the
PDD ( adjacent properties to east and north are jurisdictional
wetlands) buffers shall be 20 feet at a m inimum. See P DD
Conceptual Master Plan for proposed perimeter buffers. A 50-foot
buffer shall be provided along the property’s boundary with the GC
zoned property to its west. Underground utilities and stormwater
management facilities are allowed in the perimeter buffer area.
(ii) At all buffers of the PDD, disturbances related to grading activities
are allowed prov ided that the following preservati on practices are
met:
(A) Within 50- foot U.S. 278 highway buffer a minimum of 7
broadleaf overstory trees, 8 understory trees, and 35 shrubs
shall be preserved or re-planted per
100 linear feet of U.S 278
frontage.
(iii) Highway 278 Corridor Overlay District (HCOD) standards shall be
adhered to provided that signage shall be governed by the
provisions established by the future Master Plan.
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 12
(iii)
d. Lot Areas and Setbacks
(i) Single Family For Rent Homes and Single Family For Sale homes
will have setback and yard requirements as set forth in the below
TABLE 1:
CSP PDD DEVELOPMENT TABLE 1
MEASUREMENTS FOR UNSUBDIVIDED AND SUBDIVIDED RESIDENTIAL
Single Family Schedule of Lot Area, Yard, and Setbacks
Minimum Lot Per Unit
SF Patio4 Duplex5 Townhome6 Non-Resi7
Unsubdivided Residential (For Rent Only)1 NA NA NA NA NA
Subdivided Residential (For Sale and/or
For Rent) 1700 NA NA 1000 NA
Minimum Yard and Building Setback (feet)
Single Family & Non-Residential Uses
SF Patio4 Duplex5 Townhome6 Non-Resi7
Unsubdivided Residential Min lot width 2 NA NA NA NA NA
Subdivided Residential Min lot width 30 NA NA 18 NA
Front Yard (Measured from Edge of Road R/W)
Major Street (Multi-Lane)
NA NA NA NA
Major Street (Multi-Lane) NA NA NA NA
Minor Street 10 NA NA 10 NA
Side Yard3
Residential 5 NA NA 5
Non-Residential NA
Rear Yard3
Residential 10 NA NA 5
Non-Residential N/A
Notes:
1. "For Rent" homes can be situated on an unsubdivided single parcel and not on
individual subdivided lots. Therefore, there are no legal fee simple lots with defined
lot areas.
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 13
2. Because the "For Rent" homes can be situated on a unsubdivided single parcel
and not on individual subdivided fee simple lots, there are no defined lot dimensions.
3. For unsubdivided rental residential units, yard dimensions provided are minimum
side yard and back yard depths. In all cases, there shall be 10' minimum clear between structures.
4. Patio homes are not an included product.
5. Duplexes are not an included product.
6. Townhomes are two or more attached units with 5' side yards at each end
unit with 10' clear between adjacent structures.
7. Non-Resi is a non-residential/commercial use exclusive of community amenity improvements
and leasing and sales offices. Non-Resi uses are not an included product.
8. Setbacks are measured to the front, side or rear face of the principal structure and excludes
measurements to such things as HVAC equipment, stoops, ground level or upper-level decks,
or similar ancillary structures.
9. The required easement width for storm drainpipe of 15” to 24” in size shall not be less than 10 feet.
5. Wetlands
This designation allows the following uses within wetlands. Freshwater wetlands on the
property shall be those areas over which the applicable governmental agencies claim
jurisdiction for freshwater wetlands. Unless restricted via a future Memorandum of
Understanding (MPA) to the contrary, the following are permitted uses:
a. Open space and buffers
b. Conservation areas
c. Activities in all wetland areas as permitted by the U.S. Army Corps of
Engineers and/or the South Carolina Department of Health and
Environmental Control, Office of Ocean and Coastal Resource
Management as applicable
d. Disposal of reclaimed water as permitted by SCDHEC.
e. Boardwalks, trails, bridges, and other permitted structures.
f. Game Management
6. Utilities
This designation allows for utility service to serve the planning areas of the CSP
Development PDD. The following land uses shall be allowed only after written approval
from the Applicant I Owner and its consul tants for location and design. Screening,
buffering, and other aesthetic matters must meet or exceed the Jaser County Land
Development Regulations and may be approved at the time of site devel opment
application.
a. Potable water supply and distribution
b. Wastewater collection, treatment, and disposal
c. Stormwater collection, treatment and detention
d. Irrigation
e. Communication towers
CSP DEVELOPMENT PDD AND CONCEPTUAL MASTER PLAN
JASPER COUNTY, SC JANUARY 2022/REVISED MARCH 2024
Page | 14
f. Satellite antennas
g. Cable television facilities
h. Telephone facilities
i. Power transmission and distribution
j. Fiber optic lines
k. Other utility services i.e., Internet access and other tel ecommunication
uses
Certain comm unity-wide infrastructure is required for the devel opment of any large,
master-planned community. T his infrastructure may inc lude, but is not limited to the
following:
1. Arterial streets and primary access roads
2. Water supply
3. Wastewater Treatment and Effluent Disposal
4. Power substations
5. Central telephone facilities/ Cell phone towers
6. Stormwater Management Lagoons
7. Natural Gas Supply
8. Sewer Pump Station
Infrastructure serving the community (on-site and off-site) will be approved as part of the
development plan approval process.
7. Design Standards
Design Standards shall be submitted at the Master Plan stage and may have standards
deviating from the Jasper County Ordinances or this PDD, provided that health, safety,
ingress/egress, and fire protection are addressed to the satisfaction of the County.
EXHIBIT B
CONCEPTUAL MASTER PLAN
Residential
1
STATE OF SO
UTH CAROLINA ) DEVELOPMENT AGREEMENT
)
COUNTY OF JASPER ) CSP DEVELOPMENT TRACT
This Development Agreement ("Agreement") is made and entered this day of
, 2022 (the “ Effective Date”), by and between Conduit Street Partners, LLC (a
Maryland Limited Liability Company) ("Owner") and the governmental authority of the Jasper
County, South Carolina ("County").
WHEREAS, th
e legislature of the State of South Carolina has enacted the "South
Carolina Local Government Development Agreement Act (the "Act") as set forth in Sections 6-
31-10 through 6-31-160 of the South Carolina Code of Laws (1976), as amended; and,
WHEREAS
, the Act recognizes that the lack of certainty in the approval of
development can result in a waste of economic and land resources, can discourage sound
capital improvement planning and financing, can cause the cost of housing and development to
escalate, and can discourage commitment to comprehensive planning." [Section 6-31-10 (B)(1)];
and,
WHEREAS, the Act also states: "Development agreements will encourage the vesting of
property rights by protecting such rights from the effect of subsequently enacted local legislation
or from the effects of changing policies and procedures of local government agencies which
may conflict with any term or provision of the Development Agreement or in any way hinder,
restrict, or prevent the development of the project. Development Agreements will provide a
reasonable certainty as to the lawful requirements that must be met in protecting vested property
rights, while maintaining the authority and duty of government to enforce laws and regulations
which promote the public safety, health, and general welfare of the citizens of our State."
[Section 6-31-10 (B)(6)]; and,
EXHIBIT B-2
"REDLINE"
2
WHEREAS, the Act further authorizes local governments, including County governments,
to enter Development Agreements with owners to accomplish these and other goals as set forth
in Section 6-31-10 of the Act; and,
WHEREAS, Owner is the contract purchaser of approximately 38.84 acres, generally to
be known as CSP Development, and being more particularly described in Exhibit A and proposes
to develop, or cause to be developed, therein Residential uses, to include the potential of any
alternative allowed uses, including accessory and complimentary uses as described in the
Planned Development District Standards adopted contemporaneously herewith by separate
County Ordinance No. O-2022-16; and,
WHEREAS, the County seeks to protect and preserve the natural environment and
to secure for its citizens quality, well planned and designed development and a stable and viable
tax base; and,
WHEREAS, the County finds that the program of development proposed by Owner for
this Property is consistent with the County’s comprehensive land use plan; and will further the
health, safety, welfare and economic well-being of the County and its residents; and,
WHEREAS, the program for development of the Property presents an opportunity for
the County to secure quality planning and growth to protect the environment and strengthen
and revitalized the tax base; and,
WHER
EAS, this Development Agreement is being made and entered between Owner
and the County, under the terms of the Act, for the purpose of providing assurances to Owner that
it may proceed with its development plan under the terms hereof, as hereinafter defined,
consistent with Jasper County Zoning Ordinance and the Planned Development District Standards
for the CSP Development (as herein defined) without encountering future changes in law which
would affect the ability to develop under the Jasper County Zoning Ordinance and the Planned
Development District Standards for the CSP Development Tract, and for the purpose of providing
important protection to the natural environment and long term financial stability and a viable tax
base to the County, and for the purpose of providing certain funding and funding sources to
assist the County in meeting the service and infrastructure needs associated with the
3
development authorized hereunder;
NOW THEREFORE, in consideration of the terms and conditions set forth herein, and
other good and valuable consideration, including the potential economic benefits to both the
County and Owner by entering into this Agreement, and to encourage well planned development
by Owner, the receipt and sufficiency of such consideration being hereby acknowledged, the
County and Owner hereby agree as follows:
I. INCORPORATION.
The above recitals are hereby incorporated into this Agreement, together with the
South Carolina General Assembly findings as set forth in Section 6-31-10(B) of the Act.
II. DEFINITIONS.
As used herein, the following terms mean:
"Act" means the South Carolina Local Government Development Agreement Act, as
codified in Sections 6-31-10 through 6-31-160 of the Code of Laws of South Carolina (1976), as
amended; incorporated herein by reference.
“Adjustment Factor” shall mean the greater of three percent 3% per annum or the annual
inflation factor supplied to local governments by the SC Department of Revenue and Fiscal Affairs
for use by local governments in determining allowable millage increases, such adjustment to be
applied on July 1
st of each year with the first adjustment being applied July 1, 2023.
“Agreement” shall mean this Development Agreement as amended by the County
and Developer in writing from time to time.
“Association” shall mean one (1) or more property owners’ associations established to
maintain portions of the Property, if such is ever formulated, which is not expected if the
for th at portion(s) of the Property that is developed as rental units which are under single
ownership, as contemplated under the PDD.
4
“BJWSA” shall mean the Beaufort/Jasper Water and Sewer Authority, its successors or
assigns.
“Civic Fund” shall mean the segregated interest bearing Escrow Account into which all
Development Fees for Police, EMS and Fire are contributed pursuant to Section XI herein.
“Conceptual Master Plan” shall mean the Conceptual Master Plan adopted as part of the
Planned Development District Standards (“CSP PDD Standards”) by the County,.
“CSP PDD” means the Planned Development District for the CSP Development approved
by the County by Ordinance Number 0-2022-16, concurrently with its approval of this Agreement
“CSP PDD Standards” means the development standards applicable to the CSP PDD,
including the Conceptual Master Plan, as adopted by the County in connection with its approval of
the CSP PDD, attached hereto or incorporated by reference as Exhibit B.
“Current Legal Owner” means Paul H. Anderson, Emily A Tillman, and John F. Anderson,
who have contracted with Conduit Street Partners, LLC to sell the Property.
“County” shall mean Jasper County, South Carolina.
“DHEC” shall mean the South Carolina Department of Health and Environmental Control
“Developer” means the Owner, along with any and all successors in title, assigns or
lessees of the Owner who are transferred in writing from the Owner all or a portion of the
Development Rights under this Agreement and undertake Development of any portion of the
Property, as applicable in the context where such term is used.
"Development" means the development of portions of the Property as contemplated in
the Zoning Regulations.
“Development Fees” or “Developer Fees” shall have the meaning set forth in
Paragraph XI.
"Development Rights" means Development undertaken by the Owner or Developers in
accordance with the Zoning Regulations and this Development Agreement
5
“OCRM” means the South Carolina Office of Ocean and Coastal Resource Management
"Owner" means Conduit Street Partners, LLC, a Maryland limited liability company, its
corporate successors and any assignee, whereby such interest is assigned in writing to it by
Owner. Owner has a present equitable interest in the Property by virtue of a contract to purchase
with Current Legal Owner.
“Park Fund” shall mean the segregated interest bearing Escrow Account into which all
Development Fees for Parks are contributed pursuant to Section XI herein.
“CSP Development”, “CSP Tract” or “Property” means that certain tract of land
described on Exhibit A, as may be amended with the Agreement of the County and Owner.
“Project” means the Development that will occur within and upon the CSP Tract.
“Roadway Fund” shall mean the segregated interest bearing account into which all
Development Fees for Roads are contributed until utilized for public roadway improvements
pursuant to Section XI herein.
"Term" means the duration of this agreement as set forth in Section III hereof.
“Zoning Ordinance” means the Jasper County Zoning Ordinance adopted November
13, 2007, as amended through the Effective Date hereof, and attached hereto as Exhibit C and
incorporated herein by reference.
"Zoning Regulations" means the CSP PDD establishing a Planned Development District
for the Property, and all the attachments thereto, including but not being limited to the PDD
Conceptual Master Plan, all narratives, applications, and site development standards thereof (a
copy of all of which is attached hereto marked Exhibit B and/or incorporated herein by reference),
all as same may be hereafter amended by mutual agreement of the County and the Owner, this
Development Agreement, and the Jasper County Development Ordinance(s) being codified with
Municode© and current on Municode© through Supplement No. 3 as of June 21, 2021 as
amended through the Effective Date of this Agreement, except as the provisions thereof may be
6
clarified or modified by the terms of the CSP PDD and this Agreement, and all other applicable
statutes, ordinances and regulations governing uses and development of the Property.
III. TERM.
The term of this Agreement commenced on the date this Agreement was executed by the
County and Owner and terminates Five (5) years thereafter (“Termination Date”). This is the
maximum initial term permitted by law for the Property. Nothing in this Agreement shall be
interpreted to preclude the Parties from extending the Termination Date by mutual agreement or
from entering into subsequent development agreements.
IV. DEVELOPMENT OF THE PROPERTY.
The Property shall be developed in accordance with the Zoning Regulations and
this Agreement. All costs charged by or to the County for reviews required by the Jasper County
Zoning and Development Ordinance(s) shall be paid by the Owner or Developer or other party
applying for such review as generally charged throughout the County for plan review. The County
shall, throughout the Term, maintain or cause to be maintained, a procedure for the processing
of reviews as contemplated by the Zoning Regulations and this Agreement.
V. CHANGES TO ZONING REGULATIONS.
The Zoning Regulations relating to the Property subject to this Agreement shall
not be amended or modified during the Term, without the express written consent of the Owner
except in accordance with the procedures and provisions of Section 6- 31-80(B) of the Act,
which Owner shall have the right to challenge. Owner does, for itself and its successors and
assigns, including Developers and notwithstanding the Zoning Regulations, agrees to be bound
by the following:
1. The Owner shall be required to notify the County, in writing, as and
when Development Rights are transferred to any other party. Such information shall include
the identity and address of the acquiring party, a proper contact person, the location and number
of acres of the Property transferred, and the number of residential units and/or commercial
acreage and square footage of structure, as applicable, subject to the transfer. Developers
7
transferring Development Rights to any other party shall be subject to this requirement of
notification, and any entity acquiring Development Rights hereunder shall be required to file
with the County an acknowledgment of this Agreement and a commitment to be bound by it.
2. The Owners and Developers, and their respective heirs, successors and
assigns agree that all Development, with the exception of irrigation, incidental maintenance
facilities, and similar amenities which exist from time to time, and facilities existing at the date of
this Agreement will be served by potable water and public sewer prior to occupancy, except as
otherwise provided herein for temporary use, temporary being defined as one year or less.
Septic tanks and/or wells may be allowed with the permission of BJWSA where there is a
specific finding that such use for specific portions of the Property will comply with the overall
environmental standards.
VI. DEVELOPMENT SCHEDULE.
The Property shall be developed in accordance with the development schedule,
attached as Exhibit D, or as may be amended by Owner or Developer(s) in the future to reflect
actual market absorption. Pursuant to the Act, the failure of the Owner and any Developer to
meet the initial development schedule shall not, in and of itself, constitute a material breach of
this Agreement. In such event, the failure to meet the development schedule shall be judged by
the totality of circumstances, including but not limited to the Owners and Developer(s) good faith
efforts to attain compliance with the development schedule. These schedules are planning and
forecasting tools only and shall not be interpreted as mandating the development pace initially
forecast or preventing a faster pace if market conditions support a faster pace. The fact that
actual development may take place at a different pace, based on future market forces, is
expected and shall not be considered a default hereunder. Development activity may occur
faster or slower than the forecast schedule, as a matter of right, depending upon market
conditions. Furthermore, periodic adjustments to the development schedule which may be
submitted unilaterally by Owner / Developers in the future, shall not be considered a material
amendment or breach of the Agreement.
VII. DENSITY.
The criteria as set forth in Section II of the CSP PDD Standards shall apply with respect
to lot size, frontage, setbacks, impervious surface and height requirements, respectively, within the
8
Project. Residential density and types on the Property shall be the densities and types as set forth
in the CSP Planned Unit Development approval, Conceptual Master Plan, and as set forth
below:
1. Up to a maximum of 275 residential dwelling units may be constructed. The CSP
PDD and the CSP Conceptual Master Plan depict the expected mix and general location of allowed
residential units, however, so long as the total residential unit count does not exceed 275 units
and the general concept of development as shown on the Conceptual Master Plan is followed, the
Owner shall be allowed to alter location and product mix among all allowed uses under the PDD
at the time of Master Plan submittal when more specific design are available, based upon ongoing
project planning and market conditions.
2. Any such changes to exact location or product mix shall not be considered a
material amendment hereto, or an amendment to the attached PDD or the Conceptual Master
Plan, so long as the total allowed density is not exceeded and the use remains residential. Such
minor changes will be approved at the staff review level.
VIII. RESTRICTED ACCESS
The Owner and/or each Developer shall have the right (but not the obligation) to
create restricted access communities within the Property as long as such limited access does
not adversely affect in any material respect adjacent traffic patterns located on public rights-of-
way.
IX. EFFECT OF FUTURE LAWS.
Owner and Developers shall have vested rights to undertake Development of any
or all of the Property in accordance with the Zoning Regulations, as defined herein and modified
hereby, and as may be modified in the future pursuant to the terms of this Agreement for the
entirety of the Term. Future enactments of, or changes or amendments to the County ordinances,
including zoning or development standards ordinances, which conflict with the Zoning
Regulations shall not apply to the Property unless the procedures and provisions of §6-31-80
(B) of the Act are followed, which Owner shall have the right to challenge. Notwithstanding the
above, the Property will be subject to then current fire safety standards and state and/or
federal environmental guidelines standards of general application.
9
The parties specifically acknowledge that this Agreement shall not prohibit the
application of any present or future building, housing, electrical, plumbing, gas or other standard
codes, or any ad valorem tax of general application throughout the County, found by the
County Council to be necessary to protect the health, safety and welfare of the citizens of the
County.
X. INFRASTRUCTURE AND SERVICES
The County and Owner recognize that the majority of the direct costs associated
with the Development of the Property will be borne by the Owner and Developers, and many
other necessary services will be provided by other governmental or quasi-governmental entities,
and not by the County. For clarification, the parties make specific note of and acknowledge
the following:
A. Private Roads. All roads within the Property shall be constructed by the
Owner, Developer or other parties and maintained by such party(ies) and/or Association(s) or
dedicated for maintenance to other appropriate entities. The County will not be responsible for
the construction or maintenance of any private roads within the Property. The CSP
Development project shall have private roads designed to the standards reasonably acceptable
to the County Engineer. Road construction within SCDOT right of ways will be in accordance
with SCDOT standards. Roadway section details shall be submitted for review at the time of
development permit applications, as provided in the PDD.
B. Public Roads. All public roads outside the Property that serve the Property
are under the jurisdiction of the State of South Carolina or other governmental entities regarding
access, construction, improvements and maintenance. Owner acknowledges that it must comply
with all applicable state statues and rules and regulations of the South Carolina Department of
Transportation (“SCDOT”) or its successor regarding access and use of such public roads.
Future public roads may serve the Property. The County shall not be responsible for construction,
improvements or maintenance of the public roads which now or hereafter serve the Property,
unless it otherwise agrees in the future. Owner has engaged Bihl Engineering, LLC, of Charleston,
SC, to prepare a traffic impact analysis which has been submitted to the SCDOT for review and
comment. Subject to the approval of SDOT and any other the applicable jurisdictional authorities,
the Property is proposed to be served by direct access to the existing Brickyard Road and U.S.
10
Highway 278. Developer shall be responsible for construction of property access improvements
as recommended by SCDOT after review of the SCDOT required traffic study. Upon completion
of construction of any such improvements within the SCDOT right of way, and acceptance by
SCDOT, the SCDOT shall then maintain all roadway improvements within the public road right of
way.
C. Potable Water. Potable water will be supplied to the Property by BJWSA
or some other legally constituted public or private provider allowed to operate in the County.
The County shall not be responsible for any construction, treatment, maintenance or costs
associated with water service to the Property unless the County elects to provide such
services with the agreement of the applicable utility authority then providing such service to the
Property. Owner will construct or cause to be constructed all related infrastructure
improvements within the Property, which will be maintained by it or the service provider as
provided in any utility agreement between Owner and the service provider.
D. Sewage Treatment and Disposal. Sewage treatment and disposal will
be provided by BJWSA or some other legally constituted public or private provider allowed to
operate in the County. The County will not be responsible for any treatment, maintenance or
costs associated with sewage treatment within the Property, unless the County elects to
provide such service with the agreement of the applicable utility authority then providing such
service to the Property. Nothing herein shall be construed as precluding the County from
providing sewer services to its residents in accordance with applicable provisions of law. Owner
will construct or cause to be constructed all related infrastructure improvements within the
Property, which will be maintained by it or the provider as provided in any utility agreement
between Owner and the service provider.
E. Use of Effl
uent. Owner agrees that treated effluent will be disposed of
only in such manner as may be approved by DHEC and the BJWSA.
F. Police Services. County shall provide police protection services to the
Property on the same basis as is provided to other similarly situated residents and businesses
in the County. Owner acknowledges the jurisdiction the Sheriff of Jasper County on the Property
and shall not interfere or in any way hinder public safety activities on the Property regardless of
whether such may be a restricted access community. Should Owner desire an increased level of
service above the normal County level of police service, Owner shall be responsible for either
11
providing such services through the use of private security forces or shall pay the County’s direct
and indirect costs for providing such increased level of service.
G. Fire Services. County shall provide fire protection services to the Property
on the same basis as is provided to other similarly situated residents and businesses in the County.
Owner acknowledges the jurisdiction of the County’s fire department on the Property and shall
not interfere or in any way hinder public safety activities on the Property regardless of whether
such may be a restricted access community.
H. Sanitation Services. County will not provide sanitation services to any
properties with the Property. Should Owner desire such services, the Owner shall provide these
directly to the Property by a private licensed private contractor.
I. Recreation Services. County shall provide recreation services to the
Property on the same basis as it provides to other similarly situated residents and businesses in
the County.
J. Library Services. Such services shall be provided to residents on the
same basis as to all other citizens of the County.
K. Emergency Medical Services (EMS). Such services shall be provided to
residents of the Property on the same basis as to all other citizens of the County.
L. Drainage System. All stormwater runoff, treatment and drainage system
improvements within the Property will be designed in accordance with the Zoning Regulations
and Best Management Practices then current. All stormwater runoff, treatment and drainage
system improvements for the Property shall be constructed by Owner or the Association, as
applicable. The County will not be responsible for any construction or maintenance cost associated
with the stormwater runoff, treatment and drainage system within the Property.
M. Stor
m Water Quality. Protection of the quality in nearby waters and
wetlands is a primary goal of the County. The Owners shall be required to abide by all
provisions of federal, state and local laws and regulations, including those established by the
Department of Health and Environmental Control, the Office of Ocean and Coastal Resource
Management, and their successors for the handling of storm water. In addition to the water
quality safeguards as committed to by Owner above, notwithstanding Section IX hereof, Owner
12
and any developer shall adhere to any and all
Text truncated. Open the original for the full document.
Source: Jasper County website. First collected Nov 3, 2026.