Agenda 02.05.2024
Page 1
Watch Live via YouTube at:
https://www.youtube.com/@jcmedia6537
Pursuant to Ordinance #08-17, Any citizen of the County
may sign to speak in person at the Council Meeting
(before the Council Meeting’s Regular Meeting start
time) on the Public Comments Sign in Sheet on the
Podium to address Council on matters pertaining to County Services
and Operations. Presentations will be limited to three (3) minutes per
person and total public input will be limited to 30 minutes. Written
Public Comments may also be submitted by 1PM on the date of the
Council Meeting by emailing your comment to:
comments@jaspercountysc.gov.
To participate in a Public Hearing for a specific agenda item, you may
either email written public comments to
comments@jaspercountysc.gov by 1:00PM on Monday, February 5,
2024; or you can speak in person at the Council Meeting by signing in
on the Public Hearing Sign In Sheet located outside the Council
Chambers Doors prior to the start of the meeting. Public Hearing
Comments shall be limited to 3 minutes per person.
Instructions may also be found at the Jasper County website
www.jaspercountysc.gov
FOR MORE INFORMATION, PLEASE CALL (843) 717-3696
Agenda 02.05.2024
Page 2
JASPER COUNTY COUNCIL
Jasper County Clementa C. Pinckney Government Bldg.
358 3rd Avenue, Ridgeland, SC 29936
Monday, February 5, 2024
5:30PM
1. Call to Order by Chairman Sauls
Clerk’s Report of Compliance with the Freedom of Information Act.
*In compliance with the Freedom of Information Act, notice of meetings and agendas were posted
and furnished to all news media and persons requesting notification*
2. Executive Session SECTION 30-4-70.
(a) A public body may hold a meeting closed to the public for one or more of the following reasons:
(2) Discussion of negotiations incident to proposed contract arrangements and proposed
purchase or sale of property, the receipt of legal advice where the legal advice related to
pending, threatened, or potential claim or other matters covered by the attorney-client
privilege, settlement of legal claims, or the position of the public agency in other adversary
situations involving the assertion against the agency of a claim –Proposed Lease / Purchase
Agreement for Fire Apparatus; Lease agreement #062-21-01-0001-J2; Tax Map # 087-00-05-008
And Tax Map # 087-00-05-009
(5) Discussion of matters relating to the proposed location, expansion, or the provision
of services encouraging location or expansion of industries or other businesses in
the area served by a public body – Prospect Update; Project Refurb
ANY EXECUTIVE SESSION MATTER ON WHICH DISCUSSION HAS NOT BEEN COMPLETED MAY HAVE DISCUSSION SUSPENDED FOR
PURPOSES OF BEGINNING THE OPEN SESSION AT ITS SCHEDULED TIME, AND COUNCIL MAY RETURN TO EXECUTIVE SESSION
DISCUSSION AFTER THE CONCLUSION OF THE OPEN SESSION AGENDA ITEMS. PLEASE BE ADVISED THERE MAY BE VOTES BASED ON
ITEMS FROM THE EXECUTIVE SESSION.
3: Return to Open Session at 6:30PM
o 3.1 Action coming out of Executive Session
4. Pledge of Allegiance and Invocation:
5. Approval of the Consent Agenda Items:
Agenda 02.05.2024
Page 3
6. Approval of Agenda:
_______________________________________________________________________________________
PRESENTATIONS AND PROCLAMATIONS
_______________________________________________________________________________________
7. Smittie Cooler - Presentation to Council of Old House Strategic Plan and Grant Match Request
8. Senator Bright Matthews - State Appropriations Funding process
_______________________________________________________________________________________
RESOLUTIONS
_______________________________________________________________________________________
9. David Tedder – Consideration of Resolution #R-2024-03 Amending the Employment Agreement
between Jasper County and Andrew P. Fulghum.
10. Kimberly Burgess – Consideration of Resolution #R-2024-04 To Provide Preliminary Authorization For
The Funding For Jasper County Fire -Rescue Pumper Trucks And Capital Improvements For The Pratt
Memorial Library; To Declare The Intent Of County Council To Reimburse Jasper County For Expenditures
Relating To Jasper County Fire -Rescue Pumper Trucks And Capital Improvements For The Pratt Memorial
Library From Proceeds Of Ta x-Exempt Obligations; To Authorize The County Staff To Proceed With
Structuring The Financing For The Jasper County Fire-Rescue Pumper Trucks And Capital Improvements For
The Pratt Memorial Library; And To Provide For Other Matters Relating Thereto.
11. John Wall – Consideration of Resolution #R-2024-05 Committing To Negotiate A Fee-In-
Lieu Of Ad Valorem Taxes Agreement Between Jasper County And Project Install; Identifying
The Project; And Other Matters Related Thereto (Project Install)
______________________________________________________________________________________
PUBLIC HEARINGS, ORDINANCES AND ACTION ITEMS
12. Lisa Wagner – Public Hearing and 2nd reading of the Consideration of Ordinance
#O-2024-02 to Amend the Official Zoning Map of Jasper County so as to transfer a property located at
951 Carolina Drive, bearing Jasper County Tax Map Number 067-00-01-003 from the Rural Preservation
Zone to the Industrial Development Zone on the Jasper County Official Zoning Map. (1st reading
01.16.2024)
13. Lisa Wagner – Consideration of the 1st reading of an Ordinance to Amend the Official Zoning Map
of Jasper County so as to transfer a property located at 8415 Speedway Boulevard, bearing Jasper
County Tax Map Number 039 -00-01-026 from the Community Commercial Zone to the Industrial
Development Zone on the Jasper County Official Zoning Map.
14. Ryan Romano – Consideration of the 3rd reading of Ordinance #O-2023-20 Authorizing and
Approving a Loan from the South Carolina Transportation Infrastructure Bank; An
Agenda 02.05.2024
Page 4
Intergovernmental Agreement among Jasper County, South Carolina, The City of Hardeeville,
South Carolina and the South Carolina Transportation Infrastructure Bank; and other related
matters. (Exit 3 Finance Document) (1st reading 11.06.2023; 2nd reading 12.04.2023)
15. John Wall - Consideration of the 1st reading of an Ordinance Authorizing The Execution And
Delivery Of A Fee-In-Lieu Of Ad Valorem Taxes And Incentive Agreement By And Between Jasper
County, South Carolina And Project Install To Provide For Payment Of A Fee -In-Lieu Of Taxes;
Approving The Creation Of A Multicounty Park With Hampton County, South Carolina;
Authorizing The Execution And Delivery Of A Multicounty Park Agreement By And Between
Jasper County, South Carolina And Hampton County, South Carolina; Authorizing Certain
Infrastructure Credits And; And Other Related Matters. (Project Install)
______________________________________________________________________________________
CITIZEN COMMENTS
_______________________________________________________________________________________
16. Open Floor to the Public per Ordinance 08-17 Any citizen of the County may sign to speak in person at
the Council Meeting (before the Council Meeting’s 6:30PM start time on the Sign-In Sheet on the
Podium), to address Council on matters pertaining to County Services and Operations. Presentations will
be limited to three (3) minutes per person and total public input will be limited to 30 minutes.
_______________________________________________________________________________________
17. Administrator’s Report
_______________________________________________________________________________________
CONSENT AGENDA
_______________________________________________________________________________________
18. Ryan Romano – Consideration of the 3rd reading of Ordinance #O-2024-01 Authorizing The
Execution And Delivery Of A Fee-In-Lieu Of Ad Valorem Taxes And Incentive Agreement By And
Between Jasper County, South Carolina And Anhinga LLC, A Company Previously Known To The
County As Project Showcase, To Provide For Payment Of A Fee-In-Lieu Of Taxes; Approving The
Creation Of A Multicounty Park With Hampton County, South Carolina; Authorizing The
Execution And Delivery Of A Multicounty Park Agreement By And Between Jasper County, South
Carolina And Hampton County, South Carolina; Authorizing Certain Infrastructure Credits And;
And Other Related Matters. (Project Showcase). (1st reading 12.04.2024; 2nd reading 01.16.2024)
19. Danny Lucas – Consideration of the Request for Pratt Memorial Library Renovation - Change Order #2.
20. Danny Lucas – Consideration of the Parks & Recreation Master Plan RFP Recommendation.
21. Wanda Giles – Consideration of the reappointment request by Chairman Sauls to appoint Ms. Libby
Malphrus (Councilwoman for the Town of Ridgeland) to fill the unexpired term of Mr. Grady Woods to
the 3-year term to the SouthernCarolina Alliance Board of Directors.
Agenda 02.05.2024
Page 5
22. Wanda Giles – Consideration of the reappointment request by Mr. Danny Black of the
SouthernCarolina Alliance to reappoint L. Martin Sauls IV, Chairman of the Jasper County Council, for
another 3-year term to the SouthernCarolina Alliance Board of Directors.
23. Approval of the Minutes 12.18.2023
_______________________________________________________________________________________
END OF CONSENT AGENDA
_______________________________________________________________________________________
24. Council Members Comments
25. Possible Return to Executive Session to Continue Discussion on Matters Regarding Agenda
Item II.
*Council may act on any item appearing on the agenda including items discussed in executive
session.
26. Adjournment:
In accordance with South Carolina Code of Laws, 1976, Section 30-4-80(d), as amended, notification of the
meeting was posted on the County Council Building at a publicly accessible place and on the county website
at least 24 hours prior to the meeting. A copy of the agenda was given to the local news media and posted
at the meeting location twenty-four hours prior to the meeting.
Special Accommodations Available Upon Request to Individuals with Disabilities
(843) 717-3696
To: Jasper County Council & Staff
RE: Request for Funding
From: The Jasper County 250 Committee
Date: December 8, 2023
The Jasper County 250 Committee is requesting $ 48,000 from Jasper County as part of a larger cost
sharing grant in coordination with the SC 250 Commission for the development of the Old House/Tomb
of Thomas Heyward site into a historical park and interpretive center for the citizens of Jasper County
and its visitors.
The Jasper County 250 Committee is preparing to apply for the SC 250 Commission’s SC American
Revolution Planning/Development/Renovation Site Grant for the development and further preservation
of the Old House/Tomb of Thomas Heyward site located in the hamlet of Old House. In terms of
potential funding, this state grant is open ended. It is a competitive grant and has an application
deadline of March 26, 2024. To be eligible for the grant, the SC250 Commission is officially requiring that
Jasper County (Grantee) contribute at least 20% to the total cost of this project. However, the SC250
Commission has strongly advised that the cost share amount be larger due to the competitive nature of
this grant. Therefore, the cost share request above represents 30% of the total project estimate detailed
on the next page.
After several months of assessment, the JC250 Committee has deemed the Old House site to be the
most significant historical site in Jasper County and has great potential for development into a history
park and becoming a significant draw for cultural tourists. Further, this effort will better protect,
preserve, and catalogue this site for the present and the future.
The Old House site is the birthplace and burial place of Thomas Heyward, Jr., a signer of the Declaration
of Independence and patriot leader during the American Revolution. In addition, the site offers a
unique, invaluable, and irreplaceable opportunity to preserve, study, and understand a colonial period
rice plantation which not only includes the remains of a plantation house and associated outbuildings
but the remains of a mill, production and shipping facilities, and rice fields. Also, to further educate and
understand the life of the enslaved on a rice plantation, the impact of the Prevost Invasion on what is
now Jasper County, and the significance of Old House as the epicenter of the extraordinarily patriotic
“Euhaw neighborhood”.
Finally, it should be prepared and enhanced as soon as possible to serve as the centerpiece for the 250th
commemoration of the American Revolution in Jasper County.
Please see accompanying document entitled “Old House Plantation Strategic Plan” for the JC250
Committee’s complete plan details and vision for this site.
The primary expense categories and total for this project are as follows:
• Archeological Dig and Assessment $48,000
• Title Abstract 3,000
• Landscape Architectural Planning & Cultural Landscape Assessment and Report 10,000
• Professional repair and maintenance of cemetery walls, gates, and headstones 10,000
(Including construction of iron gate and lock to replace the stolen original)
• Trimming and bracing of ancient live oaks by professional arborist 4,000
• Site Prep 20,000
(Tree and foliage removal to create parking areas, open march views,
turnarounds for buses, level/gravel entrance)
• Landscaping (including natural screening project) 35,000
• Interpretive Signs (5 individual signs) 8,000
• Marsh Boardwalk 10,000
• Site Entrance Enhancements 12,000
(circular brick pad for historical marker, knee wall outlining entrance from highway,
brick pad through gate, replace wooden gates)
Total Estimated Cost of Project: $160,000
OLD HOUSE
PLANT A TION
REQUEST FOR JASPER COUNTY
TO INVEST IN HISTORY
Recently uncovered in the
archives of the Jasper County
Historical Society, a partial map
of a proposed site improvement
plan from 1990 developed by the
South Carolina Department of
Parks, Recreation, and Tourism.
This map shows some of the
remains that are located within
the property and ideas for
improvement. Thankfully, this
plan was not implemented.
Why? Because the previous
archaeological digs that
occurred there were preliminary
and more remains of buildings,
and relics could be just beneath
the surface.
No archaeological metal detecting of the site
has ever been performed.
No Ground Penetrating Radar has every been
performed.
This work is essential before any development
of parking lots or pathways can be designed.
Additionally, no prior archaeological team
has ever performed a search for evidence of
the Revolutionary war encampment of the
British forces that camped in the area around
the house. Gen. Augustine Prevost and his
troops camped at the Old House Plantation
site during their march from Savannah to
Charleston in the Spring of 1779.
Dan and Rita Elliott – archaeologists from
the LAMAR Institute who toured the site just
a couple of months ago, believe that such
evidence will be found.
The site is so pristine that Rita and Dan
found fragments pottery sherds on the
surface of the ground.
Luckily, Jasper County owns
the most important and
historic portion of these
lands.
Out of the original 400 acre
land grant given to Daniel
Heyward – only the small
blue section – the Old House
Plantation – has remained
untouched and unchanged
since the 1800s.
Jasper County’s required
stewardship to protect and
enhance this valuable asset
cannot be understated.
The Jasper County 250
Committee, the Sons of the
American Revolution, the
Daughters of the American
Revolution are all invested
in donating time and effort
to cleaning and
maintaining the cemetery.
Recently, they spent a day
there cleaning headstones,
and the bronze bust of
Thomas Heyward, Jr.
But the county needs to make sure
that routine ground maintenance is
performed and that the site is
patrolled to protect it from looters.
Jasper County is unique in that is has three unique –
perfectly preserved sites – two from colonial times,
and one from the Civil War - Purrysburg, Honey Hill,
and the birthplace and cemetery of Thomas Heyward,
Jr. at the Old House Plantation. It also is home to the
site of the Battle of Coosawhatchie, the very well-
known Prevost march skirmish site.
Jasper County has the potential – if it invests in this
site – to bring significant numbers of tourists and
tourist dollars into the county.
Historical tourism brings in more dollars than any
other type of tourism.
The cost for development of the Thomas Heyward site is approximately $160,000. The Jasper
SC 250 Committee is applying for grant funds to develop the site. However, partnership and
outside funds are required.
The first – and more important step – is for the archaeological dig to occur. We have met with
the LAMAR Institute and they are available to perform the work this year – preferably in the
Spring.
While the Jasper County 250 Committee will be submitting a grant proposal to the State at the
end of March for development funds, we will not be advised of the award until sometime in the
summer.
Therefore…
We are requesting that Jasper County budget $48,000 for this year to provide for the
archaeological work to be performed this Spring.
This will put the County – and the Jasper County 250 Committee – in a solid position to
be able to complete and execute development of the property in time for the 250th
Anniversary of American Revolution in 2026.
Please keep in mind – that this is an investment in Jasper County that will provide the
opportunity for the County to reap the benefits of tourist dollars.
Paired with the Historical Interpretive signs related to Purrysburg’s part in the American
Revolution and the Civil War – and more significantly – the work that is currently being
performed by the Friends of Honey Hill – the potential of these geographically close
sites has the potential for a large draw of tourists in the coming years.
A separate PowerPoint of the work going on at Honey Hill is available now for viewing if the
Council wishes to view it now.
We appreciate your time and attention to this
matter and hope that you will provide the
requested budget of $48,000 to complete the
archaeological dig this year.
1
STATE OF SOUTH CAROLINA
JASPER COUNTY
RESOLUTION NUMBER R-2024-03
RESOLUTION OF JASPER COUNTY COUNCIL
AMENDING THE EMPLOYMENT AGREEMENT BETWEEN JASPER COUNTY
AND ANDREW P. FULGHUM
WHEREAS, Jasper County (“County”) and Andrew P. Fulg hum (“Employee”)
entered into that certain agreement entitled “Jasper County Administrator
Employment Agreement (“Agreement”) on April 19, 2004, and
WHEREAS, the Agreement provides for an annual evaluation of the Employee
by County Council, with the County increasing the compensation of the Employee
in the form of a salary increase and/or bonus, dependent upon the results of the
evaluation, as well as increasing the compensation each year by the minimum of
the average across the board increase granted to other employees of the County;
and
WHEREAS, THE County has completed its evaluation of the Employee, and
found such to meet or exceed expectations; and
WHEREAS, it is the desire of the County to provide an increase in the base
salary as provided in th e Agre ement by increasing the base salary to
$170,000.00, to be effective in the February 2, 2024 payment; and
WHEREAS, at a meeting of County Council on January 25, 2024, Council voted
to increase the base salary to $170,000.00, to be effective in the February 2, 2024
payment; and
2
WHEREAS, Jasper County Council is of the belief that it is in the best interest of
the County and it s citizens to provide for these amendments in the Agreement ;
and
WHEREAS, Council desires to memorialize the action taken in the January 25 th
meeting by adopting a Resolution in writing providing for the increase in salary
and authorizing the employment contract to be amended in due course to reflect
the change;
NOW THEREFORE, BE IT RESOLVED by Jasper County Council, in the
council duly assembled and by the authority of th e same that Jasper County
Council hereby authorizes the amendment set forth below, and authorizes the
County Council Chairman to execute an “Amendment to Contract” to be prepared
by the County Attorney incorporating the modifications set forth below.
1. Section 3 Compensation, subsection (A), Base Salary, of the Agreement
shall be modified to pr ovide the annual Base Salary shall be $170,000.00
with such increase to be effective in the February 2, 2024 payroll.
2. In all other respects, the Agreement shall remain in full force and effect.
This Resolution No. R-2024-03 made this ___th day of February, 2024, ratifying
the action of Council taken at its January 25, 2024 meeting.
_______________________
L. Martin Sauls, IV
ATTEST: Chairman
_____________________
Wanda H. Giles
Clerk to Council
Reviewed for form and draftsmanship by the Jasper County Attorney.
___________________________ _____________
David L. Tedder Date
{10090-01 / 00107899 / V2}
RESOLUTION # R-2024-04
TO PROVIDE PRELIMINARY AUTHORIZATION FOR THE FUNDING FOR JASPER
COUNTY FIRE-RESCUE PUMPER TRUCKS AND CAPITAL IMPROVEMENTS FOR
THE PRATT MEMORIAL LIBRARY; TO DECLARE THE INTENT OF COUNTY
COUNCIL TO REIMBURSE JASPER COUNTY FOR EXPENDITURES RELATING
TO JASPER COUNTY FIRE -RESCUE PUMPER TRUCKS AND CAPITAL
IMPROVEMENTS FOR THE PRATT MEMORIAL LIBRARY FROM PROCEEDS OF
TAX-EXEMPT OBLIGATIONS; TO AUTHORIZE THE COUNTY STAFF TO
PROCEED WITH STRUCTURING THE FINANCING FOR THE JASPER COUNTY
FIRE-RESCUE PUMPER TRUCKS AND CAPITAL IMPRO VEMENTS FOR THE
PRATT MEMORIAL LIBRARY; AND TO PROVIDE FOR OTHER MATTERS
RELATING THERETO.
WHEREAS, the County Counci l of Jasper County, South Carolina (the “County
Council”), the governing body of Jasper County, South Carolina (the “County”), a political
subdivision of the State of South Carolina, have determined that it is in the County’s best intere st
to purchase a fleet of eleven replacement pumper trucks for the Jasper County F ire-Rescue
department (the “Pumper Fleet Project”) at an expected cost not in excess of $10,800,000, and to
acquire, construct, and equip improvements for the Pratt Memorial Library in Jasper County (the
“Pratt Library Project”) at an expected cost of approximately $5,600,000; and
WHEREAS, the Coun ty anticipates that the costs of the Pumper Fleet Project and Pratt
Library Project will be paid primarily by f unding from the County, al though funding for a
portion of the costs from a combination of other sources, including federal grants, State grants,
and other funding sources, may be possible , and the County reasonably expects to borrow not
exceeding $10,800,000 for the Pumper Fleet Project and not exceeding $2,900,000 for the Pratt
Library Project, respectively, including amounts necessary to fund reserve funds, pay capitali zed
interest, and pay costs of issuance, as necessary, to fund a portion of the costs of the Pumper
Fleet Project and Pratt Library Project, and desires to authorize the County’s administrative staff
to take the necessar y steps to proceed in financing the Pumper Fleet Project and Pratt Library
Project; and
WHEREAS, the County Council have determined that it is in the County’s best interest
to authorize its financing team to assist and advise the County with respect to th e optimal
financing options for the Pumper Fleet Project and Pratt Library Project; and
WHEREAS, the County Council desire to reimburse the County for expenditures related
to the development of the Pumper Fleet Project and Pratt Library Project (the “Project Costs”)
and by this Resolution declare their intent to do so from the proceeds of tax -exempt bonds, bond
anticipation notes, or other tax -exempt obligations, in one or more fina ncing transactions, to be
issued to provide financing for the Pumper Fleet Project and Pratt Library Project;
NOW, THEREFORE, BE IT RESOLVED BY THE COUNTY COUNCIL OF
JASPER COUNTY, SOUTH CAROLINA IN MEETING DULY ASSEMBLED:
{10090-01 / 00107899 / V2} 2
Section 1. Recitals and Findings . The facts set forth in the recitals hereof are in all
respects true and correct.
Section 2. Preliminary Authorization for F inancing. The County Counc il hereby
give preliminary authorization for the County Administrator, the Administrative Services
Director, the County Attorney, and all other appropriate officers and employees of the County to
take any and all necessary action, upon the advice of the County’s Financial Advisor and Bond
Counsel, to make preliminary arrangements for the financing of the costs of the Pumper Fleet
Project and Pratt Library Project. The County Council hereby direct appropriate County officers
and employees to work with Municipal Advisors Group of Boston, Inc. as Financial Advisor and
Howell Linkous & Nettles, LLC as Bond C ounsel to the County for the purposes of developing
the structure and terms of the financing. It is recogni zed that after evaluation of alternatives for
the structure and terms of the proposed financing for the Pumper Fleet Project and/or Pratt
Library Project, and prior to proceeding with the financing, the County Administrator will
present to County Council a definitive financing structure to be approved by ordinance of County
Council in accordance with South Carolina law.
Section 3. Declaration of Intent regarding Reimbursement . The County Council
hereby declare their intent that the County be reimbursed for any expenditures for Project Costs
from the proceeds of the tax -exempt obligations to be issued in the expected maximum principal
amount of $10,800,000 for the Pumper Fleet Project and $2,900,000 for the Pratt Library Project,
respectively. It is the intention of the County Council that this Resolution shall constitute an
official intent on th e part of the County within the meaning of Treasury Regulation Section
1.150-2(d).
Section 4. Governing Law. This Resolution shall be construed and interpreted in
accordance with the laws of the State of South Carolina.
Section 5. Effective Date. This Resolution shall become effective immediately upon
adoption by the County Council.
DONE IN MEETING DULY ASSEMBLED this ____ day of February, 2024.
(SEAL)
JASPER COUNTY, SOUTH CAROLINA
_____________________________
Chairman
___________________________
Clerk
52683101 v2
SOUTH CAROLINA )
) A RESOLUTION
JASPER COUNTY )
RESOLUTION # R-2024-05
COMMITTING TO NEGOTIATE A FEE -IN-LIEU OF AD
VALOREM TAXES AGREEMENT BETWEEN JASPER COUNTY
AND PROJECT INSTALL; IDENTIFYING THE PROJECT; AND
OTHER MATTERS RELATED THERETO
WHEREAS, Jasper County, South Carolina (“County”), acting by and through its County Council
(“County Council”) is authorized pursuant to the provisions of Title 12, Chapter 44, Code of Laws of South
Carolina, 1976, as amended (“Act”) to encourage manufacturing and commercial enterprises to locate in
the State of South Carolina (“South Carolina” or “State”) or to encourage manufacturing and commercial
enterprises now located in the State to expand their investments and thus make use of and employ th e
manpower, products, and other resources of the State by entering into an agreement with a sponsor, as
defined in the Act, that provides for the payment of a fee -in-lieu of ad valorem tax (“FILOT Payments”)
with respect to economic development property, as defined in the Act;
WHEREAS, Project Install, an entity whose name cannot be publicly disclosed at this time (“Sponsor”),
desires to invest capital in the County in order to expand its steel products manufacturing facility in the
County (“Project”);
WHEREAS, the Project is anticipated to result in an investment of approximately $11 million in taxable
real and personal property and the creation of approximately 14 new, full-time equivalent jobs; and
WHEREAS, as an inducement to the Sponsor locate the Project in the County, the Sponsor has
requested that the County negotiate an agreement (“Agreement”), which provides for FILOT Payments
with respect to the portion of the Project which constitutes econom ic development property, as defined in
the Act.
NOW, THEREFORE, BE IT RESOLVED by the County Council as follows:
Section 1. This Resolution is an inducement resolution for this Project for purposes of the Act.
Section 2. County Council agrees to enter into the Agreement, which provides for FILOT Payments
with respect to the portion of the Project which constitutes economic development property. The further
details of the FILOT Payments and the agreement will be prescribed by subsequent ordinance of the County
to be adopted in accordance with South Carolina law and the rules and procedures of the County.
Section 3. County Council identifies and reflects the Project by this Resolution, therefore permitting
expenditures made in connection with the Project before the date of this Resolution to qualify as economic
development property, subject to the terms and conditions of the Agreement and the Act.
Section 4. This Resolution is effective after its approval by the County Council.
2
52683101 v2
RESOLVED: February 5, 2024
JASPER COUNTY, SOUTH CAROLINA
Chair, Jasper County Council
(SEAL)
ATTEST:
Clerk to County Council
951 Carolina Drive Page 1 of 2
Jasper County
Planning and Building Services
358 Third Avenue - Post Office Box 1659
Ridgeland, South Carolina 29936
Phone (843) 717-3650 Fax (843) 726-7707
Lisa Wagner, CFM
Director of Planning and Building Services
lwagner@jaspercountysc.gov
Jasper County Council
Staff Report
Meeting Date: January 16, 2023
Project: Zoning Map Amendment – Industrial Development
Applicant: Staff Initiated
Tax Map Number: 067-00-01-003
Submitted For: Public Hearing and 2nd Reading
Recommendation: Planning Commission Recommends Approval of Industrial
Development
Description: This agenda item is a staff-initiated request for a Zoning Map Amendment to have a
property designated as Industrial Development . The subject property is located at 951 C arolina
Drive. The property consists of 172 acres and is currently zoned Ru ral Preservation (RP). The
property is owned by Beaufort Jasper Water Sewer Authority (BJWSA) and is known as t heir
Cherry Point Reclamation Facility where sewer is collected and treated. In accordance with Article
6 of the Zoning Ordinance, collection of sewage is allowed in the Rural Preservation (RP) Zoning
District; however, treatment of sewage is not allowed in RP. The facility was originally
constructed around 1997 – 1998, and therefore, is considered a legal non-conforming use.
Background: BJWSA submitted a major site plan application to expand the Cherry Point
Reclamation Facility in order to meet the growth demands and the projected development forecast
within their service area . During the site plan review, staff realized the property use was a legal
non-conforming use. In accordance with Article 9 of the Jasper County Zoning Ordinance, l egal
nonconformities are uses, structures, lots, or developed site improvements that do not conf orm to
one or more provisions or requirements of th e Zoning Ordinance but were lawfully established
prior to the effective date of th e current Zoning Ordinance or amendments thereto, or those
approved by the Planning Commission throu gh Article 9:3.7(2). While BJWSA could provide a
business plan and ask the Planning Commission to approve their expansion, the use would still be
non-conforming, and staff believes it is in the best interest of BJWSA and Jasper County to have
the property re-zoned to Industrial Development bringing the property use in compl iance with the
County Zoning Ordinance. This property will never be developed for any other purpose than a
sewage collection and tr eatment facil ity with the exception of accessory uses th at support the
facility. Furthermore, the facility has been operating as an industrial use for 25 years.
951 Carolina Drive Page 2 of 2
Analysis: The Zoning Map Amendment app lication and request is rev iewed b y conside ring the
following factors:
• Comprehensive Plan : According to the 20 18 Jasper County Comprehensive Pl an, the
Future Land Use M ap ide ntifies this area a s an “Urban Transition ” area. These areas are
pockets of unincorporated Jasper County that are partially or entirely surrounded by either
the City of Hardeeville or the Town of Ridgeland. In many instances, these areas were
already developed as the municipalities expanded their municipal boundaries through
annexation. For areas that experience new development or redevelopment within the Urban
Transition zones, consideration should be given to working with the adjacent municipality
for annexation.
• Adjacent Z oning: The adjacent parcels are zon ed Industrial Development, General
Commercial, Rural Preservation, and the municipal limits of Hardeeville.
• Adjacent Land Use: Adjacent land uses are a mix of both industrial and commercial uses. To
the north is a Planned Development District through the City of Hardeeville, which includes
a new residential subdivision. To the east is a Commercial Subdivision known as the Cherry
Point Business Park , which contains a variety of general commerc ial uses. To the south are
two concrete plants, a waste management facility, and undeveloped forested property. To the
west is undeveloped forested property.
• Traffic and Access: The subject property is accessed by Carolina Drive and Jasper Station
Road. Carolina Drive is a local road , maintained by Jasper County. Jasper Station Road is a
local road maintained by SCDOT.
Planning Commission Recommendation: From a land use perspective, the Planning Commission
recommends approval of Industrial Development.
Attachments:
1. Ordinance
2. Aerial map of property and surrounding area
3. Aerial map with zoning layer
4. Google Earth Map of the site and surrounding area
STATE OF SOUTH CAROLINA
COUNTY OF JASPER
ORDINANCE: O-2024-02
AN ORDINANCE
To amend the Official Zoning Map of Jasper County so as to transfer a
property located at 951 Carolina Drive, bearing Jasper County Tax Map
Number 067-00-01-003 from the Rural Preservation Zone to the
Industrial Development Zone on the Jasper County Official Zoning Map.
WHEREAS, Jasper County staff has requested the parcel bearing Ja sper County
Tax Map Number 067-00-01-003 consisting of approximately 172 acres, located at
951 Carolina Drive, be re-zoned from the Rural P reservation Zone to the Industrial
Development Zone on the Official Zoning Map of Jasper County and that request has
been submitted to the Jasper County Planning Commission and County Council; and
WHEREAS, the Jasper C ounty Planning Commission has concurred with the
recommendations of the staff report as reflected in this Ordinance and recommends
approval by Council; and
WHEREAS, this matter is now before the Jasper County Council for determination;
NOW THEREFORE BE IT ORDAINED, by the Jasper County Council in council
duly convened and by the authority of the same:
1. Jasper County Council finds that in ac cordance with the staff report and the
recommendation of the Planning Com mission, the proposed zoning is
consistent with the continued pattern of growth in the vicinity and is in
harmony with the Jasper County Co mprehensive Plan. Good ca use having
been shown , approximately 172 acres bearing Jasper County Tax Map
Number 067-00-01-003, located at 951 Carolina Park Drive on the Jasper
County Of ficial Z oning Map in the Rural Preservation Zone shall be
transferred to the Industrial Development Zone.
2. This ordinance shall take effect upon approval by Council.
_______________________
L. Martin Sauls IV
Chairman
ATTEST:
_____________________
Wanda H. Giles
Clerk to Council
ORDINANCE: # O-2024-02
First Reading: January 16, 2024
Second Reading: February 5, 2024
Public Hearing:
Adopted:
_____________________________________________
Considered by the Jasper County Planning Commission at it’s meeting on
December 12, 2023 and recommended for approval.
_____________________________________________
Reviewed for form and draftsmanship by the Jasper County Attorney.
__________________________ _______________
David Tedder Date
8415 Speedway Boulevard Page 1 of 2
Jasper County
Planning and Building Services
358 Third Avenue - Post Office Box 1659
Ridgeland, South Carolina 29936
Phone (843) 717-3650 Fax (843) 726-7707
Lisa Wagner, CFM
Director of Planning and Building Services
lwagner@jaspercountysc.gov
Jasper County Council Staff Report
Meeting Date: February 5, 2024
Project: Zoning Map Amendment – Industrial Development
Applicant: Daniel Keefer
Tax Map Number: 039-00-01-026
Submitted For: 1st Reading
Recommendation: Planning Commission Recommends Denial
Description: The Applicant requests a Zoning Map Amendment to have a property designated as
Industrial Development. The subject property consists of 4.38 acre and is identified by TMS #039-
00-01-026, located along Speedway Boulevard in Hardeeville, SC . The subject property is
currently zoned Community Commercial and was developed as a self-storage facility in 1994. The
applicant would like to have the property re-zoned to Industrial Development to complement the
RiverPort PDD with industrial uses and adjacent growth patterns within the Highway 17 Corridor
that includes industrial uses.
Analysis: The Zoning Map Amendment app lication and request is rev iewed b y conside ring the
following factors:
• Comprehensive Plan : According to the 20 18 Jasper County Comprehensive Plan, the
Future Land Use Map identifies this area as “Urban Transition”. These areas are pockets of
unincorporated Jasper County that are partially or entirely surrounded by either the City of
Hardeeville or the Town of Ridgeland . In man y instances, these areas were already
developed as the muni cipalities expanded their municipal boundaries through annexation.
For areas that experience new development or redevelopment within the Urban Transition
zones, consideration should be given to working with the adjacent municipality for
annexation.
• Adjacent Zoning : The adjacent parcels are zon ed Community C ommercial, Rural
Preservation and the city limits of Hardeeville, including the RiverPort PDD.
8415 Speedway Boulevard Page 2 of 2
• Adjacent Land Use: Adjacent land uses are commercial, vacant property, industrial uses in
the RiverPort PDD, which is in the City of Hardeeville and residential uses are nearby.
• Traffic and A ccess: The subject pro perty is accessed by Speedway Boulevard (Highway
17), which is a four-lane state maintained highway classified as a major arterial road.
Planning Commission Recommendation: The Comprehensive Plan does not support t he
designation of Industrial Development; therefore, the Planning Commission recommends denial of
the request to have t he property re -zoned to the Industrial Development Zone. Additionally, the
designation of Industrial Development would be considered spot zoning.
Attachments:
1. Application by the applicant
2. Ordinance
3. Aerial map of property and surrounding area
4. Aerial map with zoning layer
STATE OF SOUTH CAROLINA
COUNTY OF JASPER
ORDINANCE: 2024 -____
AN ORDINANCE
OF JASPER COUNTY COUNCIL
To amend the Official Zoning Map of Jasper County so as to transfer a
property located at 8415 Speedway Boulevard , bearing Jasper County Tax
Map Number 039-00-01-026 from the Community Commercial Zone to the
Industrial Development Zone on the Jasper County Official Zoning Map.
WHEREAS, the owner of the parcel bearing Jasper County Tax Map Number 039-
00-01-026, consisting of approximately 4.38 acres, located a t 8415 Speedway
Boulevard, has requested rezoning of the parcel on the Official Zoning Map of Jasper
County from the Community Commercial Zone to the Industrial Development Zone
and the propert y owner submitted that request to the Jasper County Plan ning
Commission and County Council; and
WHEREAS, the Jasper C ounty Planning Commission has concurred with the
recommendations of the staff report as reflected in this Ordinance and recommends
denial by Council; and
WHEREAS, this matter is now before the Jasper County Council for determination;
NOW THEREFORE BE IT ORDAINED, by the Jasper County Council in council
duly convened and by the authority of the same:
1. Jasper County Council finds that in accordance with the staff report and the
recommendation of the Planning Com mission, the proposed zoning is not
consistent with the continued pattern of growth in the vicinity and is not in
harmony with the Jasper County Comprehensive Plan. Good ca use having
been shown , approximately 4.38 acres bearing Jasper County Tax Map
Number 039-00-01-026, located at 8415 Speedway Boulevard, depicted on
the Jasper County Official Zoning Map in the Community Commercial Zone
shall not be changed to the Industrial Development Zone.
2. This ordinance shall take effect upon approval by Council.
_______________________
L. Martin Sauls IV
Chairman
ATTEST:
_____________________
Wanda Simmons
Clerk to Council
ORDINANCE: # 2024-__
First Reading: February 5, 2024
Second Reading:
Public Hearing:
Adopted:
_____________________________________________
Considered by the Jasper County Planning Commission at it’s meeting on
January 16, 2024 and recommended for approval.
_____________________________________________
Reviewed for form and draftsmanship by the Jasper County Attorney.
__________________________ _______________
David Tedder Date
PPAB 10067145v2
STATE OF SOUTH CAROLINA
COUNTY COUNCIL FOR JASPER COUNTY
ORDINANCE NO. O-2023-20
AUTHORIZING AND APPROVING A LOAN FROM THE SOUTH CAROLINA
TRANSPORTATION INFRASTRUCTURE BANK ; AN
INTERGOVERNMENTAL AGREEMENT AMONG JASPER COUNTY, SOUTH
CAROLINA, THE CITY OF HARDEEVILLE, SOUTH CAROLINA AND THE
SOUTH CAROLINA TRANSPORTATION INFRASTRUCTURE BANK; AND
OTHER RELATED MATTERS.
WHEREAS, the South Carolina Transportation Infrastructure Bank (“Bank”) was created for the
purpose, among others, of selecting and assisting in financing major transportation projects by providing
Financial Assistance to government units for constructing and improving highway facilities necessary for
public purpo ses, including economic development, as is more fully set forth in the South Carolina
Transportation Infrastructure Bank Act, codified at Section 11-43-110, et seq of the Code of Laws of South
Carolina 1976, as amended (“SCTIB Act”);
WHEREAS, pursuant to the SCTIB Act, the Bank has all power necessary, useful, and appropriate
to provide grants, loans and other Financial Assistance in a manner as the Bank determines advisable;
WHEREAS, by an application submitted to the Bank on or about August 28, 2019, as amended
and supplemented from time to time (“Application”), Jasper County, South Carolina (“ County”) and the
City Of Hardeeville, South Carolina (“City,” and together with the County, “Project Sponsors”) requested
a loan from the Bank in the principal amount not to exceed $28,095,903 (“Loan”) as evidenced by a Loan
Agreement by and among the Bank and the Project Sponsors, the form of which is attached here as Exhibit
A (“Loan Agreement”) provided that amounts drawn under the Loan shall not exceed $18,240,000 without
the approval of the Project Sponsors;
WHEREAS, the Application also requested a grant for from the Bank in an amount not to exceed
$28,095,903 (“Grant,” and together with the Loan, “ Financial Assistance ”) as provided for in an
intergovernmental agreement between the Bank and the Project Sponsors, the form of which is attached
here as Exhibit B (“IGA,” and together with the Loan Agreement, “Financing Documents”);
WHEREAS, the Financial Assistance will be used for (i) the construction of a new interchange on
I-95 near mile marker 3, including related drainage and storm water infrastructure (“ Exit #3 Proper
Project”) and (ii) the construction of certain improvements to an a pproximately 1.5 mile segment of
Purrysburg Road, which is sometimes referred to as Riverport Parkway North, lying north of I-95 that will
intersect with the Exit #3 Proper Project (“ Parkway North Project,” and together with the Exit #3 Proper
Project, “Projects”);
WHEREAS, the City will create a redevelopment project area pursuant to Title 31, Chapter 6 of
the Code of Laws of South Carolina, 1976, as amended (“TIF Act”) for the redevelopment of approximately
1,608.30 acres located within the City (“TIF District”) pursuant to a Redevelopment Plan attached here as
Exhibit C and a municipal improvement district pursuant to Title 5, Chapter 37 of the Code of Laws of
South Carolina 1976, as amended (“MID Act”) for the improvement of the same property includ ed in the
TIF District (“MID District”) pursuant to an Improvement Plan attached here as Exhibit D;
WHEREAS, the Loan was conditioned on a contribution from the County in the amount of
$13,500,000 (“ County Contribution ”) from which $10,100,000 will partially fund construction of the
Parkway North Project and $3,400,000 will, on behalf of the South Carolina Department of Transportation,
offset all or a portion of the cost of preliminary engineering work for the Exit #3 Proper Project.
PPAB 10067145v2 2
WHEREAS, the Loan will be secured by and payable from the following and in the following
order of priority: (i) first, 35% of the property tax revenues generated in the TIF District in excess of the
property tax revenues attributable to the initial equalized assessed value (as defined in the TIF Act) (“TIF
Revenues”), (ii) second, in the event of a shortfall of the TIF revenues, from draws on the debt service
reserve fund established under the Loan Agreement and funded by, SLF III – Hardeeville, LLC, a Texas
limited liability company (“Developer”) and (iii) third, revenues from municipal assessments to be levied
and collected in any given year by the City to replenish the debt service reserve fund created in the Loan
Agreement as provided for in the MID Act.
WHEREAS, the IG A obligates the Project Sponsors to pay cost overruns on the Projects , but
provides for the negotiation of an alternate sharing of such obligation;
WHEREAS, the Developer has previously agreed to reimburse the County for any liability
occurred under the Financing Documents beyond the County Contribution pursuant to a participation
agreement dated October 7, 2022 , between the Developer and the County (‘ Participation Agreement”);
and
WHEREAS, the Developer’s obligations under the Participation Agreement are secured by a first
priority mortgage recorded in the office of the Jasper County Register of Deeds at Book 1111, Page 742.
NOW, THEREFORE, BE IT ORDAINED by the County Council of Jasper County (“ County
Council”) as follows:
Section 1. County Council determines that the execution of the Financing Documents and the
transactions contemplated therein are proper governmental and public purposes and are anticipated to
benefit the general public welfare of the County.
Section 2. County Council approves the form of the Loan Agreement and the transactions
contemplated therein and authorizes the County Administrator and Chairman of County Council to
negotiate execute and deliver the Loan Agreement, the final form, terms and provisions of which shall be
approved by the County Administrator and Chairman of County Council, following receipt of advice from
counsel to the County, with the execution of the Loan Agreement by the County Council Chair or the
County Administrator to constitute conclusive evidence of the final approval thereof.
Section 3. County Council approves the form of the IGA and the transactions contemplated
therein and authorizes the County Administrator and Chairman of County Council to negotiate execute and
deliver the IGA, th e final form, terms and provisions of which shall be approved by the County
Administrator and Chairman of County Council, following receipt of advice from counsel to the County,
with the execution of the IGA by the County Council Chair or the County Admini strator to constitute
conclusive evidence of the final approval thereof.
Section 4. County Council authorizes the County Administrator and the Chairman of County
Council, following receipt of advice from counsel to the County, to take such further acts and negotiate,
approve and execute whatever further instruments on behalf of the County as deemed necessary, desirable
or appropriate to effect the transactions described in this Ordinance.
Section 5. This Ordinance is effective after its third and final reading by the County Council.
PPAB 10067145v2 3
Done in a meeting duly assembled this 5th day of February, 2024.
JASPER COUNTY, SOUTH CAROLINA
By: __________________________________________
Martin L. Sauls, IV, Chairman, County Council
Jasper County, South Carolina
[SEAL]
Attest:
By: ________________________________________
Wanda Simmons, Clerk to County Council
Jasper County, South Carolina
First Reading: November 6, 2023
Second Reading: December 4, 2023
Public Hearing: December 4, 2023
Third Reading: February 5, 2024
Reviewed for form and draftsmanship by Jasper County Attorney
___________________________________
David L. Tedder Date
PPAB 10067145v2 4
EXHIBIT A
LOAN AGREEMENT
52939552 v1
1/23/24 DRAFT
LOAN AGREEMENT
FOR I-95 EXIT #3 PROJECT
IN JASPER COUNTY, SOUTH CAROLINA
BY AND AMONG
THE CITY OF HARDEEVILLE, SOUTH CAROLINA
and
JASPER COUNTY, SOUTH CAROLINA
and
THE SOUTH CAROLINA TRANSPORTATION INFRASTRUCTURE BANK
DATED AS OF [__________], 2024
-i-
52939552 v1
TABLE OF CONTENTS
Page
ARTICLE I
DEFINITIONS
Section 1.1 Definitions. ...................................................................................................................... 2
ARTICLE II
TERM OF LOAN AGREEMENT
Section 2.1 Term of Loan Agreement. ............................................................................................... 5
ARTICLE III
FUNDING COMMITMENTS OF PARTIES
Section 3.1 Funding Commitments of Parties. ................................................................................... 6
Section 3.2 Project Sponsors and Owner’s Commitments and Obligations. ...................................... 7
Section 3.3 Security for and Payment of the Loan. ............................................................................ 7
ARTICLE IV
ADDITIONAL OBLIGATIONS OF THE PROJECT SPONSORS
Section 4.1 Additional Documents and Actions. .............................................................................. 12
Section 4.2 Additional Warranties and Covenants of the Project Sponsors. .................................... 13
Section 4.3 Financial Information. ................................................................................................... 13
ARTICLE V
PROJECT ADMINISTRATION AND RELATED MATTERS
ARTICLE VI
INDEMNIFICATION OF BANK
ARTICLE VII
BANK’S RIGHTS AND REMEDIES
Section 7.1 Events of Default as to the Project Sponsors. ................................................................ 14
Section 7.2 Remedies as to the Project Sponsors. ............................................................................ 15
Section 7.3 Remedies Cumulative; Non-waiver. .............................................................................. 16
ARTICLE VIII
GENERAL CONDITIONS AND PROVISIONS
ARTICLE IX
NO PLEDGE OF FULL FAITH AND CREDIT
EXHIBIT A – Form of Draw-down Note
Schedule 1 – Schedule of Advances
Schedule 2 – Amortization Schedule
Schedule 3 – Form of Requisition
EXHIBIT B – Detail of Allocations
EXHIBIT C – Exit #3 Assessment Roll for Municipal Improvement District
-1-
52939552 v1
LOAN AGREEMENT
FOR I-95 EXIT #3 PROJECT
IN JASPER COUNTY, SOUTH CAROLINA
This Loan Agreement is made and entered into as of __________, 2024 by and among JASPER
COUNTY, SOUTH CAROLINA (the “County”) and the CITY OF HARDEEVILLE, SOUTH
CAROLINA (the “City”), bodies politic and corporate and political subdivisions of the State of South
Carolina (together, the “Project Sponsors”), and the SOUTH CAROLINA TRANSPORTATION
INFRASTRUCTURE BANK, a body corporate and politic and an instrumentality of the State of South
Carolina (the “Bank”), which shall be collectively referred to herein as the “Parties,” or individually as
“Party” concerning the construction of the “Projects” (as defined herein) and in the Application (as defined
herein) for Financial Assistance (as defined herein) submitted to the Bank, and this Loan Agreement is
hereinafter referred to as the “Loan Agreement”.
WITNESSETH
WHEREAS, the Bank was created for the purpose, among others, of selecting and assisting in
financing major transportation projects by providing Financial Assistance to government units for
constructing and improving highway facilities necessary for public purposes, including economic
development, as is more fully set forth in the SCTIB Act (defined herein);
WHEREAS, pursuant to the SCTIB Act, the Bank has all power necessary, useful, and appropriate
to provide grants, loans and other Financial Assistance in a manner as the Bank Board (as defined herein)
determines advisable; routinely provides such Financial Assistance; and solicited applications for Financial
Assistance pursuant to the authority granted in the SCTIB Act;
WHEREAS, by an Application submitted to the Bank on or about August 28, 2019, as
supplemented by other submissions to the Bank, the Project Sponsors requested Financial Assistance for
the Projects;
WHEREAS, at a meeting on July 6, 2020, the Bank’s Evaluation Committee reviewed applications
for Financial Assistance and made recommendations to the Bank Board concerning those applications,
which included the Projects;
WHEREAS, at a meeting on July 7, 2020, the Bank Board reviewed and considered its available
funding capacity, the project applications for funding, and the Evaluation Committee’s recommendations,
including the recommendation on the Projects;
WHEREAS, at the meeting on July 7, 2020, the Bank Board determined that the Projects were
eligible and qualified for funding and resolved to provide funding to the Projects subject to certain
conditions specified in the Resolution approved by the Bank Board or contained within the Bank’s
Operating Guidelines, Procedures and Standard Conditions for Financial Assistance;
WHEREAS, the SCDOT Commission reviewed and approved the Financial Assistance to be
provided to the Projects by the Bank at its meeting on July 16, 2020;
-2-
52939552 v1
WHEREAS, the Joint Bond Review Committee of the General Assembly reviewed and a pproved
the Financial Assistance to be provided to the Projects by the Bank at its meeting on August 11, 2020; and
WHEREAS, the Parties now desire to set forth the respective responsibilities of the parties for the
Projects, including the funding of the Projects;
NOW, THEREFORE, in consideration of the mutual benefits, promises and obligations set forth
herein, the sufficiency of which are hereby acknowledged and accepted by each party hereto, the Parties
hereby agree as follows:
ARTICLE I
DEFINITIONS
Section 1.1 Definitions.
For purpose of this Loan Agreement, unless the context otherwise requires, the following terms
shall have the following meanings:
“Account” means the account of the Bank maintained by the South Carolina State Treasurer into
which is deposited monies to fund Disbursements for Eligible Costs of the Projects as requested by the
Bank.
“Act” or “SCTIB Act” means the South Carolina Transportation Infrastructure Bank Act, which is
codified as South Carolina Code Annotated §§ 11-43-110, et seq., as amended.
“Application” means the final Application for Financial Assistance submitted by the Project
Sponsors to the Bank on August 28, 2019, as supplemented by other materials submitted by the Project
Sponsors to the Bank prior to and after the date of the Applica tion up to the date of this Loan Agreement
that were accepted and approved by the Bank.
“Assessments” means Assessments as defined in the Assessment Roll.
“Assessment Roll” means that certain Assessment Roll for the Exit #3 Municipal Improvement
District established by ordinance enacted by the City on __________, 2024.
Assessment Year means Assessment Year as defined in the Assessment Roll.
“Bank Board” means the governing body of the Bank.
“Budget” means the budget established by the Bank for the Exit #3 Proper Project.
“Carry-over Amount” means the excess, if any, of (a) the amount of interest on the Draw down
Note that would have accrued with respect to the related six month or lesser interest period ending on an
Interest Payment Date at the rate of 3.5% per annum; over (b) the amount of interest actually paid from the
Pledged TIF Revenues on such Interest Payment Date, together with the unpaid portion of any such excess
interest from prior interest periods as more fully described in Section 3.3(F) and (H) of this Loan
Agreement.
-3-
52939552 v1
“Contract” means any contracts entered into by or on behalf of SCDOT with any other person or
firm for engineering, design, construction, materials or similar purposes for the Exit #3 Proper Project.
“Debt Service Reserve Fund” means the segregated fund established with the State Treasurer of
South Carolina, as bond trustee of the Bank, to prevent a default in the required payments of principal and
interest on the Draw-down Note.
“Debt Service Reserve Fund Requirement” means the cash deposit made by the Owner in the Debt
Service Reserve Fund, prior to the first disbursement of Grant proceeds in the amount of the maximum
annual debt service on the Loan, initially assumed to be $3,531,640 based upon a loan in the nominal
amount of $18,240,000 (which such Debt Service Reserve Fund Requirement is subject to an upward
adjustment in the event the principal on the Loan exceeds said amount).
“Determination Date” means Determination Date as defined in the Assessment Roll.
“Development Agreement” means that certain Second Amendment to and Partial Restatement of
Development Agreement dated of even date herewith between the Owner and the City, as amended or
modified from time to time, together with all exhibits, supplements and schedules relating thereto.
“Disbursements” means the transfer or payment of monies to the SCDOT for Eligible Costs of
construction of the Exit #3 Proper Project or for the payment of draw requests approved by Bank for Eligible
Costs of construction of the Exit #3 Proper Project incurred pursuant to a Contract.
“Draw-down Note” means the promissory note issued by the Project Sponsors to evidence the Loan
authorized by this Loan Agreement, all as more fully described in Section 3.3 hereof a form of which is
attached here to as Exhibit A.
“Eligible Cost(s)” has the same meaning as set forth in S.C. Code Ann. § 11-43-130(5) as applied
to qualified projects to be funded from the state highway account of the Bank, but is limited on the Exit #3
Proper Project to Eligible Costs related to construction of the Exit #3 Proper Project. For purposes of
clarification, Eligible Costs under this Loan Agreement related to construction include the costs of
construction engineering and inspections (CE&I) and those deemed eligible cos ts for construction by the
Federal Highway Administration. Eligible Costs for purposes of this Loan Agreement do not include any
costs incurred by the Owner with respect to the USACOE 404 wetland permit.
“Excess County Parkway North Deposit Funds” means the Excess County Parkway North Deposit
Funds as defined in the IGA.
“Exit #3 Proper Project” means, for the purposes of this Loan Agreement, the construction of a new
interchange on I -95 near mile marker 3, including related drainage and storm water infras tructure, all as
further described in the Application, as updated and revised to date, and the scope of work for construction
set forth in the Application.
“Event of Default” means the breach by the Project Sponsors of a provision or obligation in this
Loan Agreement set forth in Section 7.1 hereof.
“Final Assessment Year” means the Final Assessment Year as defined in the Assessment Roll.
-4-
52939552 v1
“Financial Assistance” means a Loan in the principal amount not to exceed $28,095,903 for the
Exit #3 Proper Project only as provided in this Loan Agreement as approved by the Bank and a Grant for
both Projects in an amount not to exceed $28,095,903 as approved by the Bank as provided in the IGA.
“Grant” means the grant from the Bank not to exceed $28,095,903 approved by th e Bank Board
for funding through draw requests the construction by SCDOT of the Exit #3 Proper Project and funding
for a portion of the construction by the Project Sponsors of the Parkway North Project.
“IGA” means the Intergovernmental Agreement between the Bank and the Project Sponsors dated
as of __________, 2024 related to the Projects.
“Interest Payment Date” means each [March 1] and [September 1], commencing on the earlier of
[March 1] or [September 1] after the first draw on the Draw-down Note.
“Loan” means the loan authorized by this Loan Agreement for funding the Exit #3 Proper Project,
in an amount not exceeding $28,095,903, as more fully described herein.
“Local Government Match” means the contribution by the County in the amount of $13,500,000,
which shall be deposited in a segregated account with the State Treasurer of South Carolina, as bond trustee
of the Bank and drawn down by the Bank as directed by written instrument submitted by the Bank to the
State Treasurer for approved costs of the Projects as set forth in the IGA.
“MID Act” means the Municipal Improvements Act of 1999, codified as Title 5, Chapter 37 of the
Code of Laws of South Carolina 1976, as amended and as authorized by the MID Act.
“MID Revenues” means all of the special assessment revenues required to be levied and collected
in any given year, as provided for in the Assessment Roll, as described further in Section 3.3 hereof.
“Owner” has the meaning assigned to such term in the Development Agreement. The initial Owner
is SLF III – Hardeeville, LLC, a Texas limited liability company, and any successors and assigns as Owner
under the Development Agreement; provided any such successor or assign must assume all liabilities and
obligations of the Owner under the Development Agreement with respect to the Owner Contribution.
“Owner Contribution” means the contribution by the Owner (i) in the amount of $3,100,000, which
shall be deposited in a segregated account with the State Treasurer of South Carolina, as bond trustee of the
Bank and drawn down by the Bank as directed by written instrument submitted by the Bank to the State
Treasurer from the Account for approved costs of the Parkway North Project, (ii) in an amount necessary
to fully fund the Debt Service Reserve Fund as provided in S ection 3.3(C) hereof, (iii) in the amount
necessary to complete the Parkway North Project as described in the IGA to the extent those costs exceed
the other sources of funding for the Parkway North Project as set forth in this Loan Agreement or the IGA,
(iv) in an amount necessary to complete the Parkway South Project as set forth in the IGA, and (v) in an
amount necessary to complete the Exit #3 Proper Project to the extent those costs exceed the sources of
funding for the Exit #3 Proper Project as set forth in the Development Agreement. It also includes $500,000
the Owner must deposit into an escrow account for the benefit of the Project Sponsors to cover costs of the
Parkway North Project in excess of the other sources of funding as set forth in this Loan Agreement or the
IGA.
-5-
52939552 v1
“Parkway North Project” means the construction by the Project Sponsors of certain improvements
to an approximately 1.5 mile segment of Purrysburg Road, which is sometimes referred to as Riverport
Parkway North, lying north of I-95 that will intersect with the Exit #3 Proper Project, as further described
in the Application, that meets SCDOT’s standards, specifications and requirements and does not impair or
delay the completion of the Exit #3 Proper Project.
“Parkway South Project” me ans the construction of an approximately four (4) mile segment of
Purrysburg Road, which is sometimes referred to as Riverport Parkway South, lying south of I-95 that will
intersect with the Exit #3 Proper Project, as described in the Application, that meets the SCDOT’s and the
City’s standards, specifications and requirements and does not impair or delay the completion of the Exit #3
Proper Project, and the costs of which will be paid by the Owner.
“Participation Agreement” means the Participation Agreement between the County and the Owner
dated October 7, 2022, as amended or modified from time to time.
“Pledged TIF Revenues” means 35% of the gross incremental tax revenues, pledged to pay debt
service on the Loan, as provided in Sectio n 3.3 hereof and as authorized by the TIF Act and the
Redevelopment Plan Exit #3 Redevelopment Project Area, City of Hardeeville, South Carolina, dated
__________, 2024.
“Principal Payment Date” means each [March 1], commencing with the first [March 1] that is five
years after the first draw on the Draw-down Note.
“Projects” means the construction of the Exit #3 Proper Project and construction of certain
improvements for the Parkway North Project. The term “Project” refers to either one of those two Projects
as appropriate for the context of the provision in which the term is used.
“SCDOT” means the South Carolina Department of Transportation.
“TIF Act” means Title 31, Chapter 6 of the Code of Laws of South Carolina 1976, as amended.
ARTICLE II
TERM OF LOAN AGREEMENT
Section 2.1 Term of Loan Agreement.
This Loan Agreement shall be effective as of [DATE OF LOAN AGREEMENT] , and shall
terminate, except for specific provisions set forth herein that are expressly stated to survive the termination
of this Loan Agreement or in the event of early termination as provided for herein, on the date that the Loan
is refinanced from any source other than funds of the Bank or, in the absence of such refinancing, then on
the last of the following events occurs: (i) the Bank makes the fin al Disbursement on the Exit #3 Proper
Project; (ii) the final local financial contribution or financial contribution from any source other than the
Bank for the Projects is received; (iii) the Bank receives the final payment or reimbursement due it from
the Project Sponsors pursuant to the terms and provisions of this Loan Agreement; (iv) the Projects,
including all components, are fully open for public traffic and are declared completed by the Bank; or
(v) the Draw-down Note has been paid in full.
-6-
52939552 v1
ARTICLE III
FUNDING COMMITMENTS OF PARTIES
Section 3.1 Funding Commitments of Parties.
A. Bank. Subject to the provisions, terms, and conditions in this Loan Agreement, the Bank
shall establish a Budget for the Exit #3 Proper Project within the Account. From revenues and funds of the
Bank as determined by the Bank in its discretion, the Bank shall deposit into the Account, or credit the
Budget, in such increments as it determines, a loan for the Exit #3 Proper Project not to exceed $28,095,903;
provided, however, the principal amount drawn under the Loan shall not exceed $18,240,000 unless: (i) the
Project Sponsors and the Owner consent in writing, (ii) the Bank shall have approved in writing (such
approval not to be unreasonably withheld or delayed) the revised amortization schedule and all mechanics
related to the Debt Service Reserve Fund and (iii) the Project Sponsors are not in default on the Loan
Agreement, Loan or IGA. Pursuant to the IGA, the Bank shall provide a Grant for the Projects not to exceed
$28,095,903, for a total Financi al Assistance amount not to exceed $56,191,806. The Bank shall make
Disbursements from the Account, subject to Article 6 of the IGA, to pay for Eligible Costs of the Exit #3
Proper Project incurred by the SCDOT on Contracts. The Bank shall first disburse the Grant proceeds for
the Projects and, only once the Grant has been fully exhausted, then provide Disbursements pursuant to the
Draw-down Note for the Exit #3 Proper Project; provided, in accordance with the IGA the Excess County
Parkway North Deposit Funds, if any, shall be fully exhausted prior to any further disbursement of proceeds
from the Loan. This Financial Assistance shall be used only for Eligible Costs for construction of the
Projects and shall be paid out through Disbursements from the Accou nt, subject to the provisions of this
Loan Agreement and the IGA. Attached hereto as Exhibit B is a document entitled “Detail of Project Cost
Allocations” to be used as an aid in summarizing the funding sources for the costs of the Projects as of the
date of this Loan Agreement.
In no event at any time shall the Bank be required to increase its Financial Assistance, grants,
credits, disbursements, or contributions to the Projects beyond $56,191,806; to disburse, advance, transfer
or pay from its own monies in excess of $56,191,806 for the Projects; increase its grant to the Projects
beyond $28,095,903; or increase its loan to the Exit #3 Proper Project beyond $28,095,903.
The eighth paragraph of Section 3.1 of the IGA related to savings or reductions in cos t, is
incorporated herein by reference.
The ninth paragraph of Section 3.1 of the IGA related to annual appropriations made by the General
Assembly, is incorporated herein by reference.
B. Local Government Match. Jasper County shall, subject to the appropria tion of funds by
Jasper County Council and prior to any disbursement of Grant proceeds, deposit $13,500,000 into a
segregated account with the State Treasurer of South Carolina, as bond trustee of the Bank. The Local
Government Match shall be drawn down from time to time for approved costs of the Projects in the manner
directed in the IGA and any applicable escrow agreement.
C. The Project Sponsors shall provide funding to complete the Parkway North Project if the
costs exceed $13,936,000 and any Project savi ngs from the Parkway North Project or additional funding
sources (other than from the Bank) are insufficient to complete said Project. The foregoing notwithstanding,
the Bank acknowledges that the City, the County, and the Owner may negotiate among themsel ves an
-7-
52939552 v1
alternative basis for providing any needed additional funding for the Parkway North Project in the
Development Agreement, the Participation Agreement, or both such documents. Any alternative
arrangement shall not affect the Project Sponsors’ obligation to the Bank under this Section 3.1(C).
D. Owner Contributions . The Owner shall, prior to any disbursement of Grant proceeds
(i) deposit $3,531,640 into the Debt Service Reserve Fund, (ii) deposit $3,100,000 into the Account
established for the Parkway North Project (iii) deposit $500,000 into an escrow account for the benefit of
the Project Sponsors to cover costs in excess of the funding and contributions for the Parkway North Project
as more fully set forth in the IGA and (iv) agree to complete and fully fund the construction of the Parkway
South Project.
Section 3.2 Project Sponsors and Owner’s Commitments and Obligations.
Section 3.2 of the IGA imposing conditions upon the initial disbursement of financial assistance
from the Grant or Loan is incorporated herein by reference.
A. The Project Sponsors will deliver to the Bank written opinions of the Jasper County
Attorney or retained counsel and the Hardeeville City Attorney or retained counsel as to the following
matters (or as may be otherwise approved by the Bank’s counsel):
(i) this Loan Agreement including the Draw-down Note and all documents referenced
herein to which the respective Project Sponsor is a party have been duly authorized, executed and
delivered by the Project Sponsors and constitute valid and binding obl igations of the respective
Project Sponsors, enforceable in accordance with their terms, except as such enforcement may be
limited by equitable principles and by laws affecting the enforcement of creditors’ rights generally,
but expresses no opinion on the indemnity provisions in the Loan Agreement; and
(ii) as of the date of the first disbursement, neither of the Project Sponsors is a party to
any litigation which, if adversely determined, would (a) impair the right of the Project Sponsors to
pursue the construction of the Projects as presently contemplated; or (b) materially adversely affect
the ability of the City to receive and collect the Pledged TIF Revenues and the MID Revenues.
Section 3.3 Security for and Payment of the Loan.
A. Once the Grant proceeds, the Local Government Match, the Owner Contributions and, if
applicable, Excess County Parkway North Deposit Funds have been fully expended and draws commence
on the Draw-down Note (it being acknowledged that Excess County Parkway North Deposit Funds will be
exhausted prior to any further draws on the Draw-down Note if such Excess County Parkway North Deposit
Funds become available after draws on the Draw-down Note have commenced), debt service on the Draw-
down Note will be paid from a pledge of (i) the Pledged TIF Re venues, (ii) in the event of a shortfall of
Pledged TIF Revenues, from draws on the Debt Service Reserve Fund, and (iii) the MID Revenues.
B. All of the Pledged TIF Revenues shall be deposited when received by the City from the
County into a special tax allocation fund (the “Special Tax Allocation Fund”) to be held by the City.
C. The Debt Service Reserve Fund shall be established with the State Treasurer, as bond
trustee of the Bank. The Owner shall deposit cash therein in the amount of $3,531,640, intende d to cover
maximum annual debt service on the Loan in the nominal amount of $18,240,000, prior to the first
-8-
52939552 v1
disbursement of Grant proceeds; further provided that a loan in excess of said amount if authorized pursuant
to Sections 3.1(A) and 3.3(F), shall require an additional cash deposit by the Project Sponsors into the Debt
Service Reserve Fund in an amount sufficient to cover the additional maximum annual debt service.
Promptly after each Principal Payment Date, except when the amount on deposit in the D ebt Service
Reserve Fund is less than the Debt Service Reserve Fund Requirement or an event of default exists under
this Loan Agreement, all interest earned by the State Treasurer on the Debt Service Reserve Fund, and all
other amounts on deposit in excess of the Debt Service Reserve Fund Requirement as of such Principal
Payment Date, shall be remitted to the Owner as directed by written instrument submitted by the Bank to
the State Treasurer, unless otherwise directed in writing by the City in accordance w ith the Development
Agreement.
If Pledged TIF Revenues available in the Special Tax Allocation Fund are less than the Regular
Interest Payments due on the [September] Interest Payment Date, an amount equal to such deficiency shall
be withdrawn from the Debt Service Reserve Fund on the business days prior to such [September] Interest
Payment Date and transferred to an account designated by the State Treasurer in order to pay such Regular
Interest Payments. If Pledged TIF Revenues available in the Special Tax Allocation Fund held by the City
are less than the sum of the Regular Interest Payments plus scheduled principal payments due on a Principal
Payment Date, an amount equal to such deficiency shall be withdrawn from the Debt Service Reserve Fund
on the business day prior to such Principal Payment Date and transferred to an account designated by the
State Treasurer in order to pay such Regular Interest Payments and scheduled principal payments.
D. Assessments that generate the MID Revenues shall be billed and collected in accordance
with the Assessment Roll. The Assessments that generate the MID Revenues which shall be billed pursuant
to the Assessment Roll are summarized as follows:
(i) for any Assessment Year other than the Final Assessment Year, the Assessments
that generate the MID Revenues shall be equal to the amount by which the Debt Service Reserve
Fund Requirement exceeds or is expected to exceed, as reasonably determined by the City on the
applicable Determination Date, the amount on deposit or that will be on deposit in the Debt Service
Reserve Fund after giving effect to any expected uses of funds in the Debt Service Reserve Fund
during such Assessment Year, as reasonably determined by the City on the applicable
Determination Date; and
(ii) for the Final Assessment Year, the Assessments that generate the MID Revenues
shall be equal to the amount by which the debt service (including the remaining Carry -over
Amount) due in the final year of Draw-down Note (i.e., the sum of (a) Regular Interest Payments,
(b) all principal outstanding, and (c) all remaining Carry-over Amount, in each case due during the
final year of Draw -down Note) exceeds the sum of (I) the estimated amount of Pledged TIF
Revenues expected to be available for such debt service (including the rema ining Carry -over
Amount) in the final year of Draw-down Note, including Pledged TIF Revenues then available, if
any, and Pledged TIF Revenues expected to be available, and (II) the amount estimated to be
available in the Debt Service Reserve Fund.
Except as otherwise expressly provided in this Agreement, after a withdrawal from the Debt Service
Reserve Fund specified in Section3.3(C) above, Assessments that generate the MID Revenues shall be
timely levied in accordance with the Assessment Roll in an amount equal to the amount necessary to
replenish the Debt Service Reserve Fund to the Debt Service Reserve Fund Requirement (and the Owner
-9-
52939552 v1
shall have no independent obligation to replenish the Debt Service Reserve Fund). In the event that principal
drawn down on the Draw-down Note exceeds $18,240,000, the Project Sponsors shall deposit in the Debt
Service Reserve Fund an amount equal to maximum annual debt service on such additional principal drawn,
which such amount shall also be subject to the replenishment methodology using Assessments that generate
the MID Revenues set forth above.
Additionally, the City will bill and collect Assessments that generate the MID Revenues in
accordance with the Assessment Roll for administrative expenses of the Exit #3 Municipal Improvement
District. Such Assessments that generate the MID Revenues for administrative expenses shall not secure
or be utilized to pay debt service on the Loan or to fund the Debt Service Reserve Fund.
The foregoing notwithstanding, the Bank acknowledges that the City, the County, and the Owner
may negotiate among themselves an alternative basis for the funding of any additional deposits into the
Debt Service Reserve Fund in the Development Agreement, the Participation Agreement, or both such
documents. Any alternative arrangement shall not affect the Project Sponsors’ obligation to the Bank under
this Section 3.3. The County expressly acknowledges and agrees that (i) the amount “$14,800,000” as
it appears in Sections 3(d) and 5(e) of the Participation Agreement is hereby amended to read
“$18,240,000”, and (ii) Exhibit A to the Participation Agreement is hereby amended to read exactly
like Exhibit B to this Loan Agreement.
In addition to the foregoing, amounts on deposit in the Debt Service Reserve Fund may be used on
the final maturity date of the Draw-down Note to pay any amounts due under the Draw-down Note on such
maturity date to the extent of the deficiency in available Pledged TIF Revenues. The requirement to
maintain the Debt Service Reserve Fun d shall not terminate until all amounts due and payable under the
Draw-down Note have been paid in full. All funds on deposit in the Debt Service Reserve Fund shall be
remitted to the Owner or Project Sponsors, as the case may be, within 60 days of the da te the Draw-down
Note is paid in full.
Notwithstanding anything to the contrary contained herein, if (i) the first date after the fifth
anniversary of the date of the first draw on the Draw-down Note on which any payment is scheduled to be
due on the Draw-down Note is a Principal Payment Date, and (ii) the Pledged TIF Revenues on deposit in
the Special Tax Allocation Fund as of the first Determination Date occurring after such Principal Payment
Date is greater than the aggregate scheduled debt service (for avoidance of doubt, excluding payment of
the Carry-over Amount) due during the twelve month period commencing on such Determination Date
(such excess amount being the “Year 6 Excess Pledged TIF Revenues”), the City, promptly after such
Determination Date, shall deposit the portion of such Pledged TIF Revenues then on deposit in the Special
Tax Allocation Fund into the Debt Service Reserve Fund in the amount equal to the lesser of (a) the amount
of the Year 6 Excess Pledged TIF Revenues, and (b) the amount by which the Debt Service Reserve Fund
Requirement then exceeds the amount then on deposit in the Debt Service Reserve Fund. In addition, the
Owner shall have the right, but not the obligation, to deposit moneys in the Debt Service Reserve Fund to
cause the amount on deposit therein not to exceed the Debt Service Reserve Fund Requirement. The City
shall give effect to any deposits made or to be made into the Debt Service Reserve Fund in accordance with
this paragraph for purposes of calculating the amount of Assessments to be billed and collected. For
example, assuming the Determination Date is [August 1] of each year, the first payment on the Draw-down
Note after the fifth anniversary of the date of the first draw on the Draw-down Note is the Principal Payment
Date occurring on [March 1], 2031 and funds are withdrawn from the Debt Service Reserve Fund to make
all or a portion of the [March 1], 2031 debt service payment, any shortfall in the Debt Service Reserve Fund
-10-
52939552 v1
as a result of such withdrawal will be repl enished in the following order: (1) first, from Pledged TIF
Revenues on deposit in the Special Tax Allocation Fund on [August 1], 2031 that are in excess of the
aggregate amount of scheduled debt service payments under the Draw-down Note (excluding the payment
of any Carry -over Amount) due on September 1, 2031 and March 1, 2032, (2) second, from deposits, if
any, made into the Debt Service Reserve Fund by the Owner prior to such [August 1], 2031 , and (3) third,
from MID Revenues.
E. Loan Principal shall not exceed $28,095,903 and is to be drawn and used as permitted only
for Eligible Costs of construction for the Exit #3 Proper Project as set forth in this Loan Agreement and the
IGA.
F. Principal of the Loan, drawn down from time to time, will bear interest at the rate of 3.5%
per annum. The obligation to make interest payments on an Interest Payment Date during the first five
years after the date of the first draw on the Draw -down Note will be payable only from Pledged TIF
Revenues generated, collected and received by the City during such years. On each Interest Payment Date
during such first five years after the first draw on the Draw-down Note, all Pledged TIF Revenues received
by the City on or prior to such Interest Payment Date in excess of accrued but unpaid interest under the
Draw-down Note that is not Carry-over Amount shall be used by the City first to pay any then outstanding
Carry-over Amount and the balance, if any, shall be held in the Special Allocation Fund to be used to pay
accrued but unpaid interest and then any outstanding Carry -over Amount on the subsequent Interest
Payment Dates. Interest accruing after the fifth year following the date of the first draw on the Draw-down
Note shall be due and payable in full on each Interest Payment Date (“Regular Interest Payments”). On
each Interest Payment Date after the fifth year following the date of the first draw on the Draw-down Note,
Regular Interest Payments shall be payable in full. The Carry -over Amount shall be payable on each
Principal Payment Date in an amount equal to the lesser of (i) the amount by which Pledged TIF Revenues
on deposit in the Special Tax Allocation Fund as of such Principal Payment Date exceeds the sum of
Regular Interest Payments due on such Principal Payment Date plus scheduled principal payments due on
such Principal Payment Date, and (ii) the then outstanding Carry-over Amount. Any deferred but unpaid
portion of the Carry -over Amount will be “carried over” to the next Principal Payment Date and similar
procedures shall be followed until the final maturity date of the Draw-down Note. All remaining deferred
and unpaid Carry-over Amount shall be payable in full at the final maturity date of the Draw -down Note
together with all remaining principal and any Regular Interest Payments. Failure to pay Carry-over Amount
to the extent that there are no Pledged TIF Revenues available to the City to pay such Carry-over Amount
will not constitute an Event of Default under this Loan Agreement unless such amounts remain unpaid as
of the final maturity date. Failure to pay scheduled principal payments and Regular Interest Payments shall
constitute an Event of Default under this Loan Agreement. The Parties agree that a pro-forma debt service
schedule shall be attached to the Draw -down Note at the time of the execution of the IGA, the Loan
Agreement and the Draw-down Note and a final debt service schedule shall be attached to the Draw-down
Note prior to the first draw thereon, and, if applicable, upon the completion of the Exit #3 Proper Project.
Such final debt service schedule shall be amended in the event that principal drawn down on the Draw -
down Note is less or greater than $18,240,000.
G. So long as the Draw -down Note shall be outstanding, the City will, on or before the 5 th
calendar day prior to each Interest Payment Date or Principal Payment Date, as applicable, transfer or cause
to be transferred Pledged TIF Revenues on deposit in the Special Tax Allocation Fund or other legally
available moneys which the City in its sole discretio n determines to apply for such purpose, to the State
-11-
52939552 v1
Treasurer as trustee of the Bank by wire transfer or ACH with written instructions for allocation on the
relevant Interest Payment Date and/or Principal Payment Date, as applicable.
H. Scheduled principal p ayments of the Draw -down Note shall be paid on each Principal
Payment Date (with each such payment reduced pro rata to the extent the full amount of such proceeds of
the Loan are not drawn). Principal may be prepaid in whole or in part at any time after the full payment of
Carry-over Amount from any available sources, without a prepayment penalty or prepayment fee, and any
partial prepayments (whether optional or mandatory) shall be applied to principal in any order as determined
by the City and the County. After all Carry-over Amount have been paid in full and after the payment or
provisions for payment of Regular Interest Payments and scheduled principal payments then due and, if
such prepayment is made on a date that is not a Principal Payment Date, to become due on the next Principal
Payment Date have been provided for, available Pledged TIF Revenues shall be used to prepay principal at
par. The Bank shall have and will maintain a first priority security interest in the Grant, the Local
Government Match, the Owner Contribution and the Loan proceeds until such proceeds are expended on
the Projects.
I. The Loan will have a 15-year term commencing on the date of the first draw on the Draw-
down Note.
J. From the date of the first draw on the Draw -down Note, the P ledged TIF Revenues, the
Debt Service Reserve Fund and the MID Revenues (exclusive of the MID Revenues explicitly specified in
the Assessment Roll to be used for administrative expenses of the Exit #3 Municipal Improvement District)
must be pledged to (and used for) retirement of the Loan. The Bank shall have a perfected security interest
in and a first priority lien upon all such sources specified in the preceding sentence.
K. Once all amounts under the Loan have been paid in full, the City shall have no fur ther
obligation to transfer Pledged TIF Revenues to the Bank, and the Pledged TIF Revenues may be distributed
in any manner approved by the relevant taxing entities as authorized by applicable laws and ordinances.
L. The terms of this Loan Agreement, the Draw -down Note, the documents evidencing
Pledged TIF Revenues and MID Revenues will be approved by Ordinances of the City Council and County
Council, as applicable, acceptable to the Bank and will be accompanied by opinions of counsel to the City
and County, a s applicable, to the effect that the Loan and related Draw -down Note, the documents
evidencing Pledged TIF Revenues and MID Revenues are legally binding and enforceable obligations of
the City and County, as applicable. For the avoidance of doubt, the cre ation and maintenance of the
Redevelopment Plan Exit #3 Redevelopment Project Area and Exit #3 Municipal Improvement District are
the sole responsibility of the City, subject to any consent from the County and the School District as required
by applicable law and subject to the joint and several liability of the County on the Draw -down Note and
this Loan Agreement.
M. The Bank’s Financial Assistance for the Exit #3 Proper Project shall be remitted to SCDOT
as draw requests are submitted and approved by the Bank in connection with the completion of work on the
Exit #3 Proper Project from time to time.
N. SCDOT will, pursuant to a separate agreement with the Bank, enter construction and other
contracts with respect to the Exit #3 Proper Project. The Project Sponsors shall be responsible for all costs
of the Exit #3 Proper Project in excess of the amounts allocable to the Exit #3 Proper Project as set forth in
-12-
52939552 v1
Exhibit B derived from proceeds of the Grant, the Local Government Match and the Loan. The foregoing
notwithstanding, the Bank acknowledges that the City, the County, and the Owner may negotiate among
themselves an alternative basis for providing any needed additional funding for the Exit #3 Proper Project
in the Development Agreement, the Participation Agreemen t, or both such documents. Any alternative
arrangement shall not affect the Project Sponsors’ obligation to the Bank under this Section 3.3(N).
O. Each of the City and the County are jointly and severally liable for obligations owed the
Bank under this Loan Agreement. The amounts due to the Bank shall be subject to the Bank’s statutory
right to intercept under Section 11-43-210 of the South Carolina Code against the County and City. The
foregoing notwithstanding, the Bank acknowledges that the City, the County, and the Owner may negotiate
between themselves regarding an alternative basis for the sharing of any such liability in the Development
Agreement, the Participation Agreement, or both such documents but this alternative basis shall not affect
the City’s and the County’s joint and several liability to the Bank.
P. This Loan Agreement and the Draw -down Note shall be subject to the Bank’s Standard
Terms and Conditions.
Q. Section 5.1(A) of the IGA related to review and consent to the costs of the Exit #3 Proper
Project, is incorporated herein by reference.
R. The Assessment Roll is attached hereby as Exhibit C and may not be amended without the
prior written consent of the Parties.
S. No earlier than June 1 and no later than July 1 of each year, the Bank shall deliver to the
City, the County and the Owner a written certificate containing the following information as of the [April
1] preceding the date of such certificate: (i) the outstanding principal amount under the Draw -down Note;
(ii) the aggregate amount of interest that will due under the Draw -down Note on the next two Interest
Payment Dates, (iii) the outstanding Carry -over Amount, and (iv) the amount by which the amount on
deposit in the Debt Service Reserve Fund is less that the Debt Service Reserve Fund Requirement, all of
which shall be binding on the City, the County and the Owner absent manifest error.
ARTICLE IV
ADDITIONAL OBLIGATIONS OF THE PROJECT SPONSORS
Section 4.1 Additional Documents and Actions.
A. At the request of the Bank, the Project Sponsors shall execute any other documents that the
Bank determines are reasonably necessary to evidence or establish the Project Sponsors’ obligations to the
Bank set forth in this Loan Agreement.
B. The Project Sponsors acknowledge that the Bank in its discretion may raise funds for it s
commitment to the Projects and other qualified projects through the issuance of revenue bonds or other
indebtedness as permitted under the Act. Accordingly, the Project Sponsors shall take such actions and
enter into or provide such other documents or agreements, including amendments to this Loan Agreement
or other agreements that are consistent with the substance hereof, as may be reasonably necessary to comply
with South Carolina laws and regulations associated with such bonds or indebtedness or to sat isfy
requirements for documentation and information reasonably imposed by the Bank, prospective purchasers
of such bonds, holders of such bonds, bond insurers, rating agencies, lenders or regulatory agencies and
-13-
52939552 v1
their attorneys, advisors, and representativ es; provided however, that such actions, documents and
agreements are legally permissible and that no such action or document shall create any additional material
obligation or increase any material obligation of the Project Sponsors or create or increase any obligations
of the Owner.
C. At the request of the Bank, the Project Sponsors shall enter into and execute any
amendments to this Loan Agreement all in a form and with contents, provisions and terms acceptable to the
Bank.
D. The Project Sponsors shall promp tly provide, or cause to be provided, the Bank upon
request by it copies of any and all contracts, agreements and documents relating to the Exit #3 Proper
Project.
Section 4.2 Additional Warranties and Covenants of the Project Sponsors.
Section 4.2 of the IGA related to additional warranties and covenants of the Project Sponsors, is
incorporated herein by reference.
Section 4.3 Financial Information.
A. The City and the County will provide, or cause to be provided, the following financial
information in form and content reasonably acceptable to the Bank and such additional information as
requested by the Bank from time to time:
(a) Within 180 days of the fiscal year end, their annual financial statements certified
and dated by an authorized financial officer. These financial statements must be audited (with an
opinion satisfactory to the Bank) by a Certified Public Accountant.
(b) Promptly upon receipt, copies of any management letters and correspondence
relating to management letters, sent or received.
(c) Unless otherwise inclu ded in the annual financial statements, a three -year
look-back at assessed values, property tax collection record, and Special Tax Allocation Fund
balances.
(d) Financial projections of the Pledged TIF Revenues and the MID Revenues
covering a time period acceptable to the Bank and specifying the assumptions used in creating the
projections. The projections shall be provided to the Bank no less often than 180 days after the end
of each fiscal year.
B. The City will also provide, or cause to be provided, suc h additional information as
requested by the Bank from time to time.
-14-
52939552 v1
ARTICLE V
PROJECT ADMINISTRATION AND RELATED MATTERS
Article 5 of the IGA related to Project administration and related matters, is incorporated herein by
reference.
ARTICLE VI
INDEMNIFICATION OF BANK
Article 7 of the IGA related to Indemnification of the Bank, is incorporated herein by reference.
ARTICLE VII
BANK’S RIGHTS AND REMEDIES
Section 7.1 Events of Default as to the Project Sponsors.
A. In the event the Project Sponsors shall fail to pay, when due, any installment of principal
or Regular Interest Payments, such failure shall constitute an Event of Default;
B. In the event the Project Sponsors shall fail to pay when, if and as due, any Carry -over
Amount, such failure shall constitute an Event of Default;
C. In the event the City or the County violate or fail to comply with any other provision in or
obligation under this Loan Agreement, the IGA or the Assessment Roll (including other agreements and
obligations incorporated herein or therein) and if such failure continues for a period of thirty (30) days after
receipt of a written notice of such default from the Bank, such failure shall constitute an Event of Default
hereunder.
Such events include, without limitation, the following:
(i) failure by the County to pay the Local Government Match in a timely manner;
(ii) failure by the Owner to pay the Owner Contributions in a timely manner;
(iii) failure by the City or the County to use the Grant or Loan proceeds for ‘Eligible
Costs’ as defined in the Loan Agreement;
(iv) failure by the County Treasurer to timely deliver the Pledged TIF Revenues to the
City in accordance with the [Described Agreement between County and City- Bank to Review and
Approve] and this Loan Agreement;
(v) failure by the City to deposit the Pledged TIF Revenues into the Special Tax
Allocation Fund promptly after receipt of such Pledged TIF Revenues by the City from the County;
(vi) failure by the City to timely impose the required MID Assessments to replenish
the Debt Service Reserve Fund as set forth in this Loan Agreement and the Assessment Roll;
-15-
52939552 v1
(vii) failure to attach to the Loan Agreement a final debt service schedule prior to the
first draw on the Drawn -down Note or to attached the amended debt service schedule authorized
herein;
(viii) failure to prepay principal of the D raw-down Note when sufficient Pledged TIF
Revenues are available to do so;
(ix) failure by the City to deliver a bond counsel opinion acceptable to the Bank;
(x) failure by the County to deliver an enforceability opinion acceptable to the Bank
as set forth in Section 3.2 hereof;
(xi) failure by the City to complete the Parkway North Project; or failure by the Project
Sponsors to provide sufficient funds to complete the Exit #3 Proper Project; and
(xii) failure by the Project Sponsors to reimburse the Bank within 30 days of the
cancellation of the procurement for the Exit #3 Proper Project or make any other payments to the
Bank or for the Projects required under this Loan Agreement or the IGA.
Section 7.2 Remedies as to the Project Sponsors.
Whenever any Event of Default occurs, any one or more of the following remedies may be pursued
by and shall be available to the Bank against the Project Sponsors in addition to those provided in other
sections of this Loan Agreement:
A. As to any failure to pay, when due, any Regular Interest Payment or sch eduled principal
payment, the Bank shall have the right to declare all such payments of interest and principal and all such
future payments of interest and principal for the remainder of the Loan term to be immediately due and
payable.
B. As to any Event of Default, any obligation or duty the Project Sponsors failed to perform
shall be deemed a ministerial act and subject to the pursuit of the remedies of mandamus and mandatory
injunction requiring the Project Sponsors to perform the obligation or duty, and the Bank shall be deemed
to have no adequate remedy at law for such Event of Default.
C. Among other rights and remedies available to the Bank following an uncured Event of
Default, the Bank shall have the right to cease making any further Disbursements under t his Loan
Agreement with respect to the Exit #3 Proper Project until such Event of Default has been cured and the
right to require the Project Sponsors to reimburse it for any or all Disbursements on the Exit #3 Proper
Project. The Bank shall also have and may pursue any other remedies available under South Carolina law,
including the enforcement of any remedies against any legally available funds of the Project Sponsors,
except as such remedies may be expressly limited by the specific provisions of this Lo an Agreement, and
to cease making payments of any kind on the Parkway North Project.
D. The Project Sponsors shall reimburse the Bank the reasonable attorneys’ fees and expenses
incurred by the Bank in pursuing any remedy for an Event of Default.
-16-
52939552 v1
E. In the event the City or the County fails to make any payment or reimbursement to the
Bank in full as required by this Loan Agreement, it acknowledges the authority of the State Treasurer under
S.C. Code Ann. § 11-43-210 to withhold funds allotted or appropriated by the State to the City or the County
and to apply those funds to make or complete any such payment in full to the Bank. The Project Sponsors
agree that the current provisions of Section 11-43-210 are hereby incorporated into this Loan Agreement
verbatim as an independent and separate contractual obligation of the Project Sponsors and shall be
enforceable against the Project Sponsors and survive even if S.C. Code Ann. § 11-43-210 is repealed or its
application is reduced or amended by action of the General As sembly, or it is otherwise abrogated, or its
application is reduced or modified by a court or court decision. The Bank will notify the Project Sponsors
in writing at least 30 days prior to requesting that the State Treasurer withhold such funds.
Section 7.3 Remedies Cumulative; Non-waiver.
All rights and remedies of the Bank provided for in this Loan Agreement or in any other related
document as to any party are cumulative, shall survive the termination of this Loan Agreement, and shall
be in addition to any and all other related rights and remedies provided for or available to the Bank at law,
including those contained in the Act, or in equity. The exercise of, or the failure to exercise, any right or
remedy by the Bank shall not in any way constitute a cure or waiver of an Event of Default or the waiver
of any right or remedy available to the Bank, nor invalidate any act done pursuant to any notice of the
occurrence of an Event of Default.
Section 8.2(F) of the IGA related to Joint and Several Liability, is incorporated herein by reference.
ARTICLE VIII
GENERAL CONDITIONS AND PROVISIONS
Article 9 of the IGA providing General Conditions and Provisions, is incorporated herein by
reference.
Notwithstanding anything to the contrary contained herein, the Owner is a third -party beneficiary
of Sections 3.1(C), 3.3(C), 3.3(D), 3.3(N), 3.3(Q) and 3.3(S) of this Loan Agreement. A copy of any notices
delivered by any of the Parties under this Loan Agreement and any amendments to this Loan Agreement
and the IGA shall be timely delivered to the Owner.
ARTICLE IX
NO PLEDGE OF FULL FAITH AND CREDIT
THE DRAW -DOWN NOTE AUTHORIZED BY THIS LOAN AGREEMENT IS PAYABLE
SOLELY FROM THE SOURCES DESCRIBED HEREIN, INCLUDING, BUT NOT LIMITED TO,
REVENUES, IF ANY, GENERATED AS A RESULT OF THE BANK EXERCISING THE RIGHTS IT
HAS UNDER SECTION 11 -43-210 OF THE SOUTH C AROLINA CODE AGAINST THE COUNTY
AND CITY AS DESCRIBED IN SECTION 3.3(O) OF THIS LOAN AGREEMENT. THE FULL FAITH,
CREDIT, AND TAXING POWER OF THE PROJECT SPONSORS ARE NOT PLEDGED TO THE
PAYMENT OF THE DRAW-DOWN NOTE. THE FOREGOING PROVISIONS IN THIS ARTICLE DO
NOT AFFECT OR BAR THE RIGHTS OF THE BANK TO RECOVER DAMAGES AND OTHER
REMEDIES UNDER THIS LOAN AGREEMENT OR THE IGA FROM ANY LEGALLY AVAILABLE
-17-
52939552 v1
SOURCES OF FUNDS IN THE POSSESSION OF OR AVAILABLE TO EITHER OF THE PROJECT
SPONSORS.
[SEPARATE SIGNATURE PAGES FOR EACH PARTY FOLLOW]
52939552 v1
SIGNATURE PAGE FOR THE CITY OF HARDEEVILLE
IN WITNESS WHEREOF, the City of Hardeeville has caused this Loan Agreement to be executed
on its behalf and its seal to be affixed hereto.
CITY OF HARDEEVILLE, SOUTH CAROLINA
By:
Printed Name:
Title:
ATTEST:
By:
Printed Name:
Title:
(SEAL)
Note: The City of Hardeeville City Council authorized the execution of this Loan Agreement by adoption
of Ordinance _____ on _______________, 2024.
52939552 v1
SIGNATURE PAGE FOR JASPER COUNTY
IN WITNESS WHEREOF, Jasper County has caused this Loan Agreement to be e xecuted on its
behalf and its seal to be affixed hereto.
JASPER COUNTY, SOUTH CAROLINA
By:
Printed Name:
Title:
ATTEST:
By:
Printed Name:
Title:
(SEAL)
Note: The Jasper County Council authorized the execution of this Loan Agreement by adoption of
Ordinance _____ on _______________, 2024.
52939552 v1
SIGNATURE PAGE FOR THE BANK
IN WITNESS WHEREOF, the South Carolina Transportation Infrastructure Bank has caused this
Loan Agreement to be executed on its behalf and its seal to be affixed hereto.
SOUTH CAROLINA TRANSPORTATION
INFRASTRUCTURE BANK
By:
Printed Name:
Title:
ATTEST:
By:
Printed Name:
Title:
(SEAL)
A-1
52939552 v1
EXHIBIT A
FORM OF DRAW-DOWN NOTE
$28,095,903 __________, 2024
FOR VALUE RECEIVED, THE CITY OF HARDEEVILLE, SOUTH CAROLINA (the “City”)
and JASPER COUNTY, SOUTH CAROLINA (the “County”), both bodies politic and corporate and
political subdivisions of the State of South Carolina (together, the “Project Sponsors”), hereby promise,
jointly and severally, to pay to the order of the South Carolina Transportation Infrastructure Bank, an
instrumentality of the State of South Carolina (the “Bank”), but only from the sources and in the manner
described herein, the principal sum of TWENTY-EIGHT MILLION NINETY-FIVE THOUSAND NINE
HUNDRED THREE DOLLARS ($28,095,903) (or so much thereof as may be drawn down f rom time to
time evidenced by the Schedule of Advances attached hereto).
This Note is issued pursuant to a Loan Agreement dated as of even date herewith, between the
Project Sponsors and the Bank (as amended or modified from time to time, the “Loan Agreement”). Certain
terms used as defined terms in this Note shall have the meanings ascribed thereto in the Loan Agreement.
This Note shall be dated as of the date of its delivery and shall bear interest from such date as
limited by the following paragraph, at the rate of 3.5% per annum, payable as provided herein.
The obligation to make interest payments during the first five years of this Note will be payable
only from Pledged TIF Revenues collected by the County and received by the City during such years in
accordance with the terms of the Loan Agreement. Interest accruing after the 5th year following the date
of the first draw on this Note shall be due and payable in full on each Interest Payment Date (“Regular
Interest Payments”). On each Interest Payment Date after the 5th year following the date of the first draw
on this Note, Regular Interest Payments shall be payable in full. The Carry-over Amount shall be payable
as set forth in the Loan Agreement. Failure to pay scheduled principal payment s and Regular Interest
Payments shall constitute an Event of Default under the Loan Agreement.
Principal of this Note shall be payable in accordance with the Amortization Schedule attached
hereto.
Payment of principal, interest and Carry-over Amount on this Note are secured by a pledge of and
first priority lien on the Pledged TIF Revenues and, in the event of a shortfall in available Pledged TIF
Revenues, first, from a draw upon the Debt Service Reserve Fund and second, a pledge of all of the MID
Revenues (exclusive of the MID Revenues explicitly specified in the Assessment Roll to be used for
administrative expenses of the Exit #3 Municipal Improvement District). The Debt Service Reserve Fund,
the Pledged TIF Revenues and the MID Revenues shall remain i n effect until this Note is paid in full. In
the event the principal amount drawn on this Note exceeds $18,240,000, the Debt Service Reserve Fund
Requirement shall be subject to upward adjustment and set forth in the Loan Agreement.
This Note may be prep aid in full or in part at any time to the Bank, at the outstanding principal
amount thereof to be prepaid in accordance with the terms of the Loan Agreement.
THIS NOTE IS PAYABLE SOLELY FROM THE SOURCES OF REVENUE DESCRIBED IN
THE LOAN AGREEMENT, INCLUDIN G, BUT NOT LIMITED TO, REVENUES, IF ANY,
GENERATED AS A RESULT OF THE BANK EXERCISING THE RIGHTS IT HAS UNDER SECTION
11-43-210 OF THE SOUTH CAROLINA CODE AGAINST THE COUNTY AND CITY AS
DESCRIBED IN SECTION 3.3(O) OF THE LOAN AGREEMENT. THE FULL FAITH, CREDIT, AND
TAXING POWER OF THE PROJECT SPONSORS ARE NOT PLEDGED TO THE PAYMENT OF THIS
A-2
52939552 v1
NOTE. THE FOREGOING LIMITATION DOES NOT AFFECT OR BAR THE RIGHTS OF THE
BANK TO RECOVER DAMAGES AND OTHER REMEDIES UNDER THE LOAN AGREEMENT OR
THE IGA FROM LEGALLY AVAIL ABLE SOURCES OF FUNDS IN THE POSSESSION OF OR
AVAILABLE TO EITHER OF THE PROJECT SPONSORS.
It is hereby certified and recited that all acts, conditions and things required to exist, have happened
and have been performed in regular and due form and time as required by the Constitution and laws of the
State of South Carolina applicable thereto, and that the issuance of this Note does not violate any
constitutional or statutory limitation of indebtedness.
[Remainder of page intentionally blank]
A-3
52939552 v1
IN WITNESS WHEREOF, the Project Sponsors have executed this Note by the manual signatures
of the Mayor of the City and the County Administrator of the County, all as of the _____ day of
__________, 2024.
CITY OF HARDEEVILLE, SOUTH CAROLINA
By:
Mayor
JASPER COUNTY, SOUTH CAROLINA
By:
County Administrator
52939552 v1
SCHEDULE 1
Schedule of Advances
[Date of First Draw] __________
__________
__________
__________
__________
52939552 v1
SCHEDULE 2
Amortization Schedule
[A pro-forma debt service schedule (assuming the principal amount to be drawn shall be $18,240,000 and
with principal payments commencing in the 6th year following the first draw under the Draw-down Note)
shall be attached to this Draw-down Note at the time of execution of the IGA, the Loan Agreement and this
Draw-down Note.]
[A final debt service schedule shall be attached to this Draw -down Note prior to the first draw, and, if
applicable, upon the completion of the Exit #3 Proper Pro ject. Such final debt service schedule shall be
amended in the event that principal drawn down on this Draw -down Note is less than or greater than
$18,240,000.]
52939552 v1
SCHEDULE 3
Form of Draw Request
52939552 v1
EXHIBIT B
DETAIL OF PROJECT COST ALLOCATIONS
Spreadsheet Data Taken from Excel
Created at Meeting on September 28, 2021
As Revised August 18, 2023 Based on Updated Costs
As of the date of this Loan Agreement
Jasper County SIB Grant SIB Loan* Owner Total
Preliminary Engineering* $ 3,400,000 $ 0 $ 0 $ 0 $ 3,400,000
Parkway North Project 10,100,000 736,000 0 3,100,000** 13,936,000
Exit #3 Proper Project 0 27,359,903 18,240,000 0 45,599,903
$13,500,000 $28,095,903 $18,240,000 $3,100,000 $62,935,903
* For Exit #3 Proper Project only
** Does not include Owner Parkway North Project cost overrun deposit of $500,000
Note: Owner is obligated to fund and construct the Parkway South Project.
52939552 v1
EXHIBIT C
ASSESSMENT ROLL FOR
EXIT #3 MUNICIPAL IMPROVEMENT DISTRICT
PPAB 10067145v2 5
EXHIBIT B
IGA
-1-
INTERGOVERNMENTAL AGREEMENT
FOR I-95 EXIT 3 AND RELATED PROJECTS
LOCATED IN JASPER COUNTY, SOUTH CAROLINA
This Intergovernmental Agreement is made and entered into as of __________, 2023 by
and between JASPER COUNTY, SOUTH CAROLINA (the “County”) and the CITY OF
HARDEEVILLE, SOUTH CAROLINA (the “City”), bodies politic and corporate and political
subdivisions of the State of South Carolina (together, the “Project Sponsors” and individually, a
“Project Sponsor”), and the SOUTH CAROLINA TRANSPORTATION INFRASTRUCTURE
BANK, a body corporate and politic and an instrumentality of the State of South Carolina (the
“Bank”), all of which also may be collectively referred to herein as the “Parties” or individually
as a or the “Party,” as appropriate, concerning the construction of the “ Exit #3 Proper Project” as
defined herein, and the “ Parkway North Project” as defined herein and the Parkway South Project
as defined herein, all of which are located in the City of Hardeeville in Jasper County, South
Carolina. The foregoing projects are described in more detail hereinbelow and in the Project
Sponsors’ Application for Financial Assistance submitted to the Bank. This Intergovernmental
Agreement is hereinafter referred to as this “Agreement.”
W I T N E S S E T H:
WHEREAS, the Bank was created for the purpose, among others, of selecting and assisting
in financing major transportation projects by providing Financial Assistance to government units
for constructing and improving highway facilities necessary for public purposes, including
economic development, as is more fully set forth in the South Carolina Transportation
Infrastructure Bank Act (“SCTIB Act”), S.C. Code Ann. §§ 11-43-110, et seq.;
WHEREAS, pursuant to the SCTIB Act, the Bank has all power necessary, useful, and
appropriate to provide grants, loans and other Financial Assistance in a manner as the Board
determines advisable and solicited applications for Financial Assistance pursuant to the authority
granted in the SCTIB Act;
-2-
WHEREAS, by an Application submitted to the Bank on or about August 28, 2019, as
supplemented by other submissions to the Bank, the Project Sponsors requested Financial
Assistance for the Projects as defined herein;
WHEREAS, at a meeting on July 6, 2020, the Bank’s Evaluation Committee reviewed
applications for Financial Assistance and made recommendations to the Bank Board concerning
those applications which included the Projects;
WHEREAS, at a meeting on July 7, 2020, the Bank Board reviewed and considered its
available funding capacity, the project applications for funding, and the Evaluation Committee’s
recommendations, including the recommendation on the Projects;
WHEREAS, at the meeting on July 7, 2020, the Bank Board determined that the Projects
were eligible and qualified for Financial Assistance and resolved to provide such assistance to the
Projects subject to certain conditions specified in the Resolution approved by the Bank Board or
contained within the Bank’s Overall Operating Guidelines, Procedures and Standard Conditions
for Financial Assistance;
WHEREAS, the SCDOT Commission reviewed and approved the Financial Assistance to
be provided to the Projects by the Bank at its meeting on July 16, 2020;
WHEREAS, the Joint Bond Review Committee of the General Assembly (“JBRC”)
reviewed and approved the Financial Assistance to be provided to the Projects by the Bank at its
meeting on August 11, 2020;
WHEREAS, the Parties agreed to the financial terms for the Projects on September 28,
2021;
WHEREAS, the Parties memorialized the financial terms of the Financial Assistance in a
term sheet, dated January 15, 2022, agreed to by the Bank, the SCDOT, Jasper County, City of
Hardeeville, and SLF III-Hardeeville, LLC; and
-3-
WHEREAS, the Parties now desire to set forth the respective responsibilities of the Parties
for the Projects, including the funding of the Projects;
NOW, THEREFORE, in consideration of the mutual benefits, promises and obligations set
forth herein, the sufficiency of which are hereby acknowledged and accepted by each Party hereto,
the Parties hereby agree as follows:
DEFINITIONS
For purpose of this Agreement, unless the context otherwise requires, the following terms
shall have the following meanings:
“Account” means the account of the Bank maintained by the South Carolina State
Treasurer (also referred to herein as State Treasurer’s Office) into which is deposited monies to
fund Disbursements for Eligible Costs of the Projects.
“Act” means the South Carolina Transportation Infrastructure Bank Act, which is codified
as S.C. Code Ann. §§ 11-43-110, et seq., as amended.
“Application” means the final Application for Financial Assistance submitted by the
Project Sponsors to the Bank on August 28, 2019, as supplemented by other materials submitted
by the Project Sponsors to the Bank prior to and after the date of the Application up to the date of
this Agreement that were accepted and approved by the Bank Board.
“Bank Board” means the Board of Directors of the Bank.
“Budget” means the budget established by the Bank for the Projects.
“Contract(s)” means any contracts entered into by SCDOT or by the Project Sponsors or a
Project Sponsor with a firm for construction, including materials and supplies, in connection with
the Projects as authorized by this Agreement.
-4-
“Cost Overruns” or “Cost Overrun” means the actual cost of the Exit #3 Proper Project or
the Parkway North Project, as applicable, that exceeds the amount of funds allocated separately to
the respective Projects by this Agreement from the Grant, Loan, County PE Deposit, County
Parkway North Deposit, Excess County Parkway North Deposit Funds, or Owner Parkway North
Deposit. Cost Overruns also include the costs that exceed the total contract amount for either
Project entered into pursuant to the terms of this Agreement, including a contract on the Exit #3
Proper Project entered into pursuant to Section 5.1 of this Agreement, to the extent those costs
exceed the total contract amount for each respective Project.
“Development Agreement” means that certain Second Amendment to and Partial
Restatement of Development Agreement dated of even date herewith between the Owner and the
City, as amended from time to time.
“Disbursements” means (i) for the Parkway North Project the transfer or payment of
monies pursuant to draw requests as set forth in this Agreement to reimburse the Project Sponsors
for Eligible Costs of construction of that Project or for the payment of invoices approved by Bank
for Eligible Costs of construction of that Project incurred pursuant to a Contract based on draw
requests submitted to the Bank subject to the terms and conditions of this Agreement, including
Article 6; and (ii) for the Exit #3 Proper Project as set forth in Section 6.3 of this Agreement, the
transfer or payment of monies pursuant to draw requests to reimburse SCDOT for Eligible Costs
of construction of that Project or for the payment of invoices approved by Bank for Eligible Costs
of construction of that Project incurred pursuant to a Contract based on draw requests submitted
to the Bank subject to the terms and conditions of SCDOT Intergovernmental Agreement and also
the Loan Agreement with respect to Disbursements from the Loan.
“Eligible Cost(s)” (i) for the Parkway North Project has the same meaning as set forth in
S.C. Code Ann. § 11-43-130(5) as applied to qualified projects to be funded from the state highway
account of the Bank, but is limited on the Parkway North Project to Eligible Costs related to
construction of that Project. For purposes of clarification, Eligible Costs under this Agreement
related to construction of the Parkway North Project include the costs of construction engineering
and inspections and costs paid from the County Parkway North Deposit or by the Project Sponsors
-5-
or the Owner. Eligible Costs for the Parkway North Project as applicable to the Bank’s Financial
Assistance only, do not include those costs set forth in Section 6.2 of this Agreement that are
recognized in that section as not being Eligible Costs for that Project to be paid from the Bank’s
Financial Assistance; and (ii) for the Exit #3 Proper Project has the same meaning as set forth in
S.C. Code Ann. § 11-43-130(5) as applied to qualified projects to be funded from the state highway
account of the Bank, but is limited on the Exit #3 Proper Project to Eligible Costs related to
construction of that Project. For purposes of clarification, Eligible Costs under this Agreement
related to construction of the Exit #3 Proper Project include the costs of construction engineering
and inspections and those deemed eligible costs for construction by the Federal Highway
Administration, including demolition in the event the Project Sponsors or the Owner fail to legally
obligate the funds to complete construction of the Exit 3 Proper Project to the satisfaction of the
SCDOT and the Bank within sixty (60) days of SCDOT providing written notice to the Project
Sponsors and Owners that demolition will be implemented. Notwithstanding the foregoing,
Eligible Costs for the Exit #3 Proper Project include those costs for preliminary engineering, initial
permitting and related costs being paid by a contribution from the County in the amount of
$3,400,000 for that Project (defined below as the County PE Deposit) or by contributions from the
Project Sponsors if that cost exceeds the $3,400,000. Eligible Costs for purposes of this
Agreement and Loan Agreement do not include any costs incurred by the Owner with respect to
the USACOE 404 wetland permit.
“Event of Default” means the breach by the Project Sponsors of a provision or obligation
in this Agreement or in the Loan Agreement as set forth in Section 8.1 of this Agreement.
“Financial Assistance” for purposes of this Agreement includes the Grant and Loan
approved by the Bank Board as contemplated by and described in the SCTIB Act.
“Exit #3 Proper Project” means the construction by SCDOT of a new interchange on
Interstate 95 near mile marker 3, including related drainage and storm water infrastructure, as
further described in the Application and approved by SCDOT which complies with the Interchange
Justification Report.
-6-
“Exit #3 Proper Project Bid Date” means the date on which SCDOT receives bids from
contractors on the Exit #3 Proper Project. Bid date is set currently for December 2024. SCDOT
will provide written notification during the right of way plan approval process of the 120 -day
deadline date.
“Fiscal Year” means the fiscal year of the State of South Carolina that runs from July 1 to
June 30.
“Grant” means the grant from the Bank not to exceed $28,095,903 approved by the Bank
Board for funding through draw requests the construction by SCDOT of the Exit #3 Proper Project
and for funding through draw requests a portion of the construction by the Project Sponsors of the
Parkway North Project.
“Interchange Justification Report” means the Interchange Justification Report approved by
the Federal Highway Administration for the Exit #3 Proper Project.
“Loan” means a draw down loan from the Bank for the construction of the Exit #3 Proper
Project in the initial principal amount of $18,240,000, but which may be later increased to a total
principal amount of not to exceed $28,095,903 subject to the provisions in S ection 3.1(a) of the
Loan Agreement.
“Loan Agreement” means the Loan Agreement for Exit #3 Proper Project by and among
the City, County, and Bank dated of even date herewith, as amended from time to time.
“Owner” has the meaning assigned to such term in the Development Agreement. The
initial Owner is SLF III – Hardeeville, LLC, a Texas limited liability company, and any successors
and assigns as Owner under the Development Agreement; provided any such successor or assign
must assume all liabilities and obligations of the Owner pursuant to Section B of Article XXI of
the Development Agreement.
“Owner Financial Assistance Obligations” means any financial or other obligations of the
Owner contained in or relating to this Agreement, the Loan Agreement, the Development
Agreement (solely to the extent such provisions or obligations in the Development Agreement
-7-
relate to the construction or funding of the Projects or the Parkway South Project or are express
obligations to the Bank), or the Participation Agreement.
“Parkway North Project” means the construction by the City of certain improvements to
an approximately 1.5 mile segment of Purrysburg Road, which is sometimes referred to as
Riverport Parkway North, lying north of Interstate 95 that will intersect with the Exit #3 Proper
Project, as further described in the Application that meet s the standards, specifications and
requirements of SCDOT and the Interchange Justification Report and does not impair or delay the
completion of the Exit #3 Proper Project.
“Parkway South Project” means the construction by the Owner, in cooperation with the
City, of an approximately four (4) mile segment of Purrysburg Road, which is sometimes referred
to as Riverport Parkway South, lying south of Interstate 95 that will intersect with the Exit #3
Proper Project, as further described in the Application, that meets the standards, specifications and
requirements of SCDOT and the Interchange Justification Report and does not impair or delay the
completion of the Exit #3 Proper Project, and the costs of which will be paid by the Owner.
“Participation Agreement” means that certain Participation Agreement dated as of October
7, 2022, by and between the Owner and the County, as may be amended, modified or
supplemented, from time to time.
“Projects” mean the Exit #3 Proper Project and the Parkway North Project. The term
“Project” refers to either one of those two Pr ojects as appropriate for the context of the provision
in which the term is used.
“SCDOT” means the South Carolina Department of Transportation.
“SCDOT Intergovernmental Agreement” means the Intergovernmental Agreement entered
into between SCDOT and the Bank relating to the construction of the Exit #3 Proper Project dated
of even date herewith, as amended from time to time.
-8-
TERM OF AGREEMENT
This Agreement shall be effective as of __________, 2023, and shall terminate, except for
specific provisions set f orth herein that are expressly stated to survive the termination of this
Agreement, on the date the last of the following events occurs (i) the Bank makes the final
Disbursement on the Projects; (ii) the final local financial contribution or other financial
contribution or payment from any source other than the Bank for the Projects is received; (iii) the
Bank receives the final payment or reimbursement due it from the Project Sponsors pursuant to
the terms and provisions of this Agreement and the Loan Agre ement; (iv) the Projects and the
Parkway South Project, including all components, are fully open for public traffic and are declared
completed by the Bank; or (v) the Loan Agreement is terminated . Provided, however, that this
Agreement, including the Financial Assistance set forth herein, shall terminate if either or both of
the Project Sponsors fail to consent to the costs of the procurement by SCDOT for the construction
of the Exit #3 Proper Project as provided in Section 5.1.A of this Agreement.
FUNDING AND RELATED COMMITMENTS OF PARTIES
Bank
The total estimated costs of construction and administration for the Exit #3 Proper Project
is $45,604,000. The total estimated costs of the Parkway North Project is $13,936,000.
Subject to the provisions, terms, and conditions in this Agreement, the Bank shall establish
a Budget for the Projects within an Account(s) of the Bank. From revenues and funds of the Bank
as determined by the Bank in its discretion, the Bank may deposit into the Account, or credit the
Budget, in such increments as it determines, Financial Assistance in form of a Loan, which is
expected to be in the amount of $18,240,000 but may later be increased to a total Loan not to
exceed $28,095,903 based on the costs of the Exit #3 Proper Project and pursuant to the consent
provisions set forth in Section 3.1(a) of the Loan Agreement, and a Grant for the Projects not to
exceed $28,095,903, as set forth below in this Section 3.1. The Bank may make Disbursements
-9-
from the Account, subject to the terms and conditions of this Agreement, including Article 6, to
pay for Eligible Costs of the construction of the Projects incurred by the Project Sponsors or
SCDOT pursuant to Contracts.
The Bank shall first disburse the Grant proceeds as needed and authorized by the Bank for
the Projects. The portion of the Grant that may be drawn and disbursed on the Parkway North
Project shall not exceed $736,000 (the “Parkway North Grant Commitment”) and shall be drawn
on a three-way dollar for dollar matching basis from the Parkway North Grant Commitment an d
the County Parkway North Deposit (as such term is defined below) and Owner Parkway North
Deposit (as such term is defined below) set forth in Sections 3.2 A and B, below, until the Parkway
North Grant Commitment is expended. Prior to the final expenditure from the Parkway North
Grant Commitment, the Project Sponsors, in cooperation with the Owner, shal l determine if the
funds needed to complete the Parkway North Project will exceed the total of the Parkway North
Grant Commitment, the County Parkway North Deposit, Owner Parkway North Deposit and the
Owner Parkway North Cost Overrun Deposit (as such term is defined below) set forth in
Sections 3.2 A and B, below. In the event additional funds are needed to complete the Parkway
North Project, the Project Sponsors shall provide the additional funds needed to complete the
Parkway North Project which may include additional funds the Owner agrees to provide for the
Parkway North Project pursuant to the Participation Agreement or the Development Agreement or
both such documents.
Following the Bank’s expenditure on the Parkway North Grant Commitment on the dollar-
for-dollar basis set forth above, the sources of funding set forth above in Section 3.2 A and B,
below must be fully expended on the respective Projects before the Bank will be obligated to pay
or reimburse Eligible Costs on the Exit #3 Proper Project from the Loan.
After the remaining Grant funds have been fully expended on the Exit #3 Proper Project
and the funding obligations of the County set forth in Sections 3.2 A, on the Exit #3 Proper Project
have been fully expended, the Bank may then make Disbursements from the Loan on the Exit #3
Proper Project based only on draw requests from SCDOT. The Bank reserves the right, in its
reasonable discretion, to alter the timing of the allocation of the expenditure of Grant proceeds and
-10-
Loan proceeds and the commencement of draws on the Loan based on the needs of SCDOT to
fund the Exit #3 Proper Project and the status of the construction of the Projects and the Parkway
South Project. Notwithstanding the foregoing, the Parties acknowledge that the County PE Deposit
(as such term is defined below) may be drawn by SCDOT to pay for preliminary engineering,
initial permitting and related costs for the Exit #3 Proper Project prior to the commencement of
dollar for dollar matching draws on the Parkway North Project. Further notwithstanding the
foregoing, the City and Owner may commence construction of all or a portion of the Par kway
North Project after conveyance of those portions of Purrysburg Road described in Section 3.2.D
of this Agreement to the City by SCDOT and prior to the Exit #3 Proper Project Bid Date. In that
event, upon the first Disbursement of Grant proceeds on the Exit #3 Proper Project, Eligible Costs
of the Parkway Project North incurred by the City or Owner may be submitted to the Bank pursuant
to the provisions in Article 6 of this Agreement for payment or reimbursement from the Parkway
Project North Grant Commitment, the County Parkway North Deposit, and the Owner Parkway
North Deposit on the three-way dollar for dollar matching basis as set forth in this Section.
The Financial Assistance shall be used only for Eligible Costs for the construction of the
respective Projects as authorized by this Agreement and the SCDOT Intergovernmental
Agreement and shall be paid out only through Disbursements from the Account based on draw
requests subject to the provisions , as applicable, of this Agreement, including Article 6, and the
SCDOT Intergovernmental Agreement. All draw requests and Disbursements from the Loan must
also comply with the Loan Agreement.
In addition to the other terms and conditions in this Agreement, in no event at any time
shall the Bank be required t o increase its Financial Assistance of any kind to the Projects, or to
disburse, advance, transfer or pay from its own monies, in excess of $28,095,903 from the Grant
or $28,095,903 from the Loan.
Any savings or reductions in the total cost of one or both of the respective Projects shall be
credited against and reduce the amount of the Bank’s Financial Assistance to that respective
Project(s). The Bank may in its discretion apply any such savings or cost reductions to C ost
Overruns on either Project. Furthermore, any additional state (other than the Bank’s), county,
-11-
municipal, regional government or private funds of any kind or any Federal funds of any kind
provided and secured for one or both of the Projects in any form other than those identified in the
Application shall offset and reduce the amount of the Bank’s Financial Assistance for that Project
on a dollar for dollar basis unless those funds are needed, as determined by the Bank, to complete
the Project in a manner consistent with its original scope or with an expanded or upgraded scope
approved by the Bank or to cover increased costs of the Project approved by the Bank. Any unspent
funds committed to or allocated for a Project from the Financial Assistance remaining after
completion of that Project must be transferred or released to the Bank by the Project Sponsors
unless this obligation is waived or modified by action of the Bank Board.
To the extent that Financial Assistance for a Project, or a portion of that Financial
Assistance, to be provided by the Bank, is subject to an annual appropriation made by the General
Assembly to the Bank as a matter of law, the provision by the Bank of that Financial Assistance,
or portion thereof, for the Project in each Fiscal Year of the State is subject to an appropriation by
the General Assembly to the Bank of funds sufficient to cover the Disbursements for that Project
for that Fiscal Year that need to be made from such an appropriation. In the event the amount of
any such appropriation required by law is not sufficient for that purpose, the Bank shall confer and
work with the Project Sponsors to reduce or manage the amount of Financial Assistance used for
the Project to an amount within the appropriation to the Bank for the Projects and all other sources
of funds legally available to the Bank for the Project for that Fiscal Year. If the appropriation
required by law and all other sources of funds legally available for the Projects to the Bank are
insufficient as determined by the Bank to provide any Financial Assistance for the Projects for a
Fiscal Year, the Financial Assistance from the Bank for the Projects may be suspended by the
Bank Board until sufficient funds are appropriated by the General Assembly to the Bank and/or
other sources of funds are legally available to the Bank for the Projects for such Financial
Assistance to resume. The suspension of Financial Assistance under this section shall not
constitute a termination of, or a default of an obligation under, this Agreement.
-12-
Project Sponsors’ and Owner’s Commitments and Obligations
The provision and initial Disbursement of Financial Assistance from the Grant or Loan by
the Bank is contingent and conditioned upon: (1) the City’s creation , with the consent of the
County and the Jasper County School District, and the continued enforceability and viability of a
legally binding Tax Increment Financing District (“TIF”) comprised at a minimum of the real
property described in Exhibit A, attached to this Agreement and incorporated herin by reference,
authorized by the Tax Increment Financing Law (S.C. Code Sections 31-6-10 et seq.) as described
in the Application which provides for property tax collections pursuant thereto sufficient to cover
the debt service and other obligations of the Project Sponsors on the Loan as set forth in the Loan
Agreement; and (2) the City’s creation and continued enforceability and viability of a legally
binding Municipal Improvement District (“MID”) comprised at a minimum of the real property
described in Exhibt A, attached to this Agreemen t, and incorporated herein by reference,
authorized by the Municipal Improvements Act of 1999 (S.C. Sections 5-37-10, et seq.) as
described in the Application which provides for special assessments imposed thereunder as needed
to supplement TIF revenues to cover the debt service on the Loan as provided in the Loan
Agreement. Revenues from the TIF and the MID must be pledged to and used for the repayment
of the Loan subject to the terms of the Loan Agreement.
The City is required to send to the Bank reports as to the TIF and MID on an annual basis,
or sooner upon the request of the Bank, including the status of the TIF and MID, revenues resulting
therefrom, anticipated changes in revenues, and other such reports as may be relevant to the
sufficiency and viability of the TIF and MID as revenue sources sufficient to repay the Loan
provided for in the Loan Agreement and for the completion of the Projects. Any costs related to
these reports will be the r esponsibility of the Project Sponsors. The Bank may ask for more
frequent reports on the TIF or MID accounts that are delinquent.
In addition to the other obligations and conditions set forth in this Agreement or the Loan
Agreement, including those relat ed to the TIF and the MID, the Project Sponsors or Owner, as
applicable, must take the following actions which, except with respect to items E and, G below,
must occur prior to the first Disbursement from the Grant:
-13-
A. The County must deposit a total o f $13,500,000 into one or more segregated
accounts or subfunds of the Bank with the State Treasurer’s Office that will be subject to
Disbursements by the Bank for the Projects based on draw requests as provided for in this
Agreement or the SCDOT Intergovernmental Agreement, including, but not limited to, $3,400,000
for preliminary engineering, initial permitting and related costs for the Exit 3 Proper Project (the
“County PE Deposit”) and $10,100,000 for costs of the Parkway North Project ( the “County
Parkway North Deposit”). These County required deposits may be made separately. The Parties
acknowledge and agree that the (1) County PE Deposit has been made by the County and (2) the
County Parkway North Deposit shall be made prior to the date of the first Disbursement from the
Grant by the Bank. Notwithstanding anything to the contrary contained in this Agreement, the
Loan Agreement, the Participation Agreement, the Development Agreement, the SCDOT
Intergovernmental Agreement or any other documents or agreements related to the Financial
Assistance or funds committed by the Project Sponsors or Owner to the Projects , ( x) upon
completion of the preliminary engineering and obtaining the initial permits for the Exit #3 Proper
Project and the payment in full of all costs related thereto, the remaining amount of the County PE
Deposit funds held by the State Treasurer’s Office, if any, shall be deposited and added to the
County Parkway North Deposit and used to pay for the costs of the Parkway North Project (such
remaining amount of the County PE Deposit being referred to herein as the “Excess County PE
Funds”), and (y) upon completion of the Parkway North Project and the payment in full of all costs
related thereto, the remaining amount of the County Parkway North Deposit (including, for
avoidance of doubt, any Excess County PE Funds then constituting part of the County Parkway
North Deposit) shall be used to pay for the costs of the Exit #3 Proper Project (such remaining
amount of the County Parkway North Deposit, including any remaining portion of the Excess
County PE Funds, being referred to herein as the “Excess County Parkway North Deposit Funds”).
B. The Owner must deposit not less than $3,100,000 into a segregate fund or subfund
of the Bank with the State Tr easurer’s Office that will be subject to Disbursements by the Bank
for the Parkway North Project (the “ Owner Parkway North Deposit ”) based on draw requests
submitted pursuant to Article 6 of this Agreement. The Owner must deposit $500,000 into an
escrow ac count for the benefit of the Project Sponsors to pay Cost Overruns in excess of the
-14-
funding and contributions for the Parkway North Project provided for in this Agreement (the
“Owner Parkway North Cost Overrun Deposit) which funds shall be released and made available
to the City upon its request to cover Cost Overruns on the Parkway North Project. The foregoing
deposits shall be made prior to the first Disbursement from the Grant by the Bank. Upon
completion of the Parkway North Project and the payment in full of all costs of the Parkway North
Project, any remaining Owner Parkway North Cost Overrun Deposit funds shall be promptly
returned to the Owner.
C. The Owner must fully fund the initial Debt Service Reserve Fund Requirement as
defined and more fully set forth in the Loan Agreement.
D. Prior to 120 days from the Exit #3 Proper Project Bid Date and within 30 days after
the Owner’s receipt of the written request from the SCDOT, the Owner must convey by general
warranty deeds all land needed by SCDOT for the Exit #3 Proper Project; provided, each such
general warranty deed shall contain a reverter clause to the Owner or other grantor providing such
land shall revert to the Owner or other grantor in the deed if (i) SCDOT rejects all bids for the Exit
#3 Proper Project and permanently cancels the procurement in accordance with Section 5.1.A. of
this Agreement or (ii) the Exit #3 Proper Project is abandoned, and such land is no longer needed
by SCDOT for highway purposes; provided, if the Exit #3 Proper Project is not completed for any
reason and SCDOT determines to retain title to such land , SCDOT shall compensate the Owner
for such land in accordance with condemnation procedures and requirements under the laws of the
State of South Ca rolina. Except as otherwise expressly provided in the preceding sentence, t he
respective conveyances to SCDOT shall be at no cost to SCDOT, Bank, the County, or the City.
The descriptions and dimensions of these land for the Projects shall be determined by SCDOT
after consultation with the City , County and Owner, but generally be as shown on the concept
plans for Exit #3 Prop er Project prepared by Stantec and previously approved by SCDOT . After
this Agreement and the Loan Agreement are signed by the Parties, SCDOT will transfer to the City
the state-owned sections of Purrysburg Road by quitclaim deed. This transfer will include the at
grade section where the CSX railroad line crosses Purryburg Road and the bridge over I -95 and
will be from Church Road to US 17, less and excepting the 1.62 mile County owned section located
from MO 10.78 to MP 12.60 and any and all other sections of Purrysburg Road which are or may
-15-
be under the ownership or control of the County, which such County sections shall be transferred
by the County to the City by way of quitclaim deed for no additional consideration. Prior to 120
days from the Exit #3 Proper Project Bid Date, the City shall convey by quitclaim deed to SCDOT
that portion of Purrysburg Road which is within the Exit #3 Proper Project, as shown on the
approved right of way plans.
E. The Owner must complete at its own cost the construction of Parkway South Project
as described in the Application that meets the standards, specifications and requirements of
SCDOT and the Interchange Justification Report.
F. The City shall deliver to the Bank a fully-executed Development Agreement which
must include provisions, terms, conditions, and remedies that fully protect the interests of the Bank
under this Agreement and the Loan Agreement, including those related to the Owner Financial
Assistance Obligations, are enforceable by the Bank against the C ity and the Owner, and are
subject to the prior review and approval of the Bank.
G. In connection with the assignment or transfer of any kind by the Owner of the
Owner’s development rights under the Development Agreement or the Owner Financial
Assistance Obligations to another Owner as defined in the Development Agreement, the proposed
assignee or transferee shall execute an assumption agreement of all Owner Financial Assistance
Obligations. The form of the assumption agreement instrument shall be an Exhibit to the
Development Agreement. The form and contents of the assumption agreement shall be subject to
prior approval by the Bank. The Owner or the City shall provide the Bank a copy of the executed
assumption agreement within 30 days of its execution. The transferring or assigning Owner shall
be released from all Owner Financial Assistance Obligations upon completion of such transfer or
assignment and assumption pursuant to this section . In the event of the failure of the Owner or
such assignee or transferee to execute the assumption agreement approved by the Bank in
accordance with this Section 3.2.G or the Owner fails to enforce or comply with or enforce the
requirements in this Section 3.2.G, the aforesaid release of the Owner shall be void and of no
effect. The foregoing provisions apply to all of the real property located within the TIF or MID
identified in the above first paragraph of Section 3.2 of this Agreement.
-16-
H. The City shall have entered into a contract with a contractor for the construction of
the Parkway North Project with the bonds and insurance required by Section 5.5 of this Agreement,
and the Owner shall have entered into a contract with a contractor for the construction of the
Parkway South Project with the bonds and insurance required by Section 5.5 of this Agreement.
Interest and other earn ings earned on amounts deposited in the segregated accounts or
subfunds described in items of Sections 3.2. A and B, above shall remain in each of those accounts
until all costs and payments, including all costs and payments on the Projects, or all payments due
or owed to the Bank pursuant to this Agreement, the Loan Agreement or other agreement related
thereto are paid in full. After the foregoing conditions are fully satisfied, the interest and other
earnings and any unspent or unobligated funds in those accounts shal l be remitted to the County
or Owner respectively from the account or subfund it funded, unless such funds must be applied
to pay costs to complete the Projects, including Cost Overruns . With respect to the Owner’s
deposits set forth in Section 3.2. B above, the amount of that deposit that is not reimbursed to the
Owner from the remittance from that account or subfund identified above in this paragraph shall
be addressed in the Development Agreement.
The Project Sponsors shall provide additional funding to complete the Projects if (i) Cost
Overruns occur; or (ii) any funds or contributions to be provided for the Projects from a source
other than the Bank are not received. Notwithstanding the foregoing, the Bank acknowledges that
the Project Sponsors and the Owner may negotiate among themselves regarding an alternative
basis for the sharing of this obligation in the Participation Agreement, the Development
Agreement, or both such documents, but this shall not affect the Project Sponsors ’ obligations to
the Bank under this paragraph.
If the City Council of the City or County Council of the County, respectively, fail to
appropriate or to otherwise authorize the payment and funding obligations in this Agreement,
including, but not limited to, the County PE Deposit, County Parkway North Deposit, or the
funding obligation in the preceding paragraph, such failure shall constitute an Event of Default
under Section 8.1 of this Agreement. Provided, however, the Bank acknowledges that foregoing
obligation in this paragraph does not constitute a pledge of their respective full faith, credit and
-17-
taxing power, but this acknowledgment does not affect or bar the rights of the Bank to recover
damages and obtain other remedies under this Agreement from any legally available sources o f
funds in the possession of or available to either of the Project Sponsors.
Section 3.3 Summary of Allocation of Project Costs
Attached hereto as Exhibit B is a summary document entitled “Detail of Project Cost
Allocations” to be used as an aid in the implementation of this Intergovernmental Agreement. In
the event of a conflict between this Intergovernmental Agreement and Exhibit B, the provisions of
this Intergovernmental Agreement shall govern.
ADDITIONAL OBLIGATIONS OF THE PROJECT SPONSORS
Additional Documents and Actions
A. At the request of the Bank, the Project Sponsors shall execute any other documents
that the Bank determines are reasonably necessary to evidence or establish the Project Sponsors’
obligations to the Bank set forth in this Agreement.
B. The Project Sponsors acknowledge that the Bank in its discretion may raise funds
for its commitment to the Projects and other qualified projects through the issuance of revenue
bonds or other indebtedness as permitted under the Act. Accordingly, the Project Sponsors shall
take such actions and enter into or provide such other documents or agreements, including
amendments to this Agreement or other agreements that are consistent with the substance hereof,
as may be reasonably necessary to comply with South Carolina laws and regulations associated
with such bonds or indebtedness or to satisfy requirements for documentation and information
reasonably imposed by the Bank, prospective purchasers of such bonds, holders of such bonds,
bond insurers, rating agencies, lenders or regulatory agencies and their attorneys, advisors, and
representatives; provided however, that such actions, doc uments and agreements are legally
permissible and that no such action or document shall create any additional material obligation or
increase any material obligation of the Project Sponsors.
-18-
C. At the request of the Bank, each Project Sponsor shall enter int o and execute any
amendments to this Agreement all in a form and with contents, provisions, and terms acceptable
to the Bank, unless the amendment creates a new material obligation for that Project Sponsor or
materially increases an existing obligation of that Project Sponsor.
D. The Project Sponsors shall promptly provide the Bank upon request by it copies of
any and all contracts, agreements and documents relating to the Projects.
Additional Warranties and Covenants of the Project Sponsors
In addition to ot her requirements and obligations contained within this Agreement, the
Project Sponsors warrant, covenant, and acknowledge that:
A. The Project Sponsors have full power and authority to execute, deliver and perform
and to enter into and carry out the transactions contemplated by the provisions in this Agreement,
and the execution and performance of these provisions and transactions by the Project Sponsors
does not and will not violate any applicable law and does not, and will not, conflict with or result
in a default under any agreement or instrument to which the County or the City is a party or by
which it is bound, a violation of which would cause a material adverse effect to the Bank. This
Agreement has, by proper action, been duly authorized, executed and d elivered by the Project
Sponsors.
B. This Agreement is valid, binding, and enforceable as to the Project Sponsors in
accordance with its terms, provided that neither Project Sponsor can give assurances regarding the
enforceability of Section 4.2.F and Article 7 hereof, and the Project Sponsors shall perform their
obligations as set forth in this Agreement in accordance with its terms.
C. The relevant TIF, MID, and other documents, instruments and agreements essential
to providing the Project Sponsors’ funding and payment obligations under this Agreement,
including Section 3.2 of this Agreement, have all been lawfully executed by the Project Sponsors;
the forgoing notwithstanding, the County makes no representation or warranty as to the lawful
creation and maintenance of the TIF or the MID beyond the exercise of its full consent to the
-19-
creation and maintenance of the TIF and MID and to the use and pledge of a portion of the County’s
share of the TIF incremental revenues as security for the Loan and for the repayment of the Loan
as more fully set forth in the Loan Agreement.
D. Following (a) the City’s establishment of the TIF; (b) the City’s securing of consent
to the pledge of a portion of their respective TIF revenues by the County and the Jasper County
School District; (c) the City’s establishment of the MID; and (d) any required appropriation of
funds by the Jasper County Council with respect to the County Parkway North Deposit, no further
referenda, authorizations, consents or approvals of governmental bodies or agencies are required
in connection with the execution and delivery by the Project Sponsors of this Agreement and the
performance of their obligations under this Agreement, including those for the funding and
payment obligations under t his Agreement, inclusive of Section 3.2 of this Agreement , except
with respect to any future appropriation of funds required to satisfy any financial obligation of the
City and/or the County that may arise under this Agreement in the future. Provided, however, that
the construction of the Projects may require permits and other approvals by governmental agencies
other than the Project Sponsors and the Bank, and the Project Sponsors affirm that they will comply
with applicable law.
E. No litigation at law or in equity, nor any proceeding before any governmental
agency, authority or other tribunal involving the Project Sponsors is pending or, to the knowledge
of the Project Sponsors threatened, in which any judgment or order may be or has been rendered,
or is sought, that may have a material and adverse effect upon the operations or assets of the Project
Sponsors or the Owner or would materially or adversely affect the validity of this Agreement, or
the performance by the Project Sponsors or Owner of their obligations hereunder or the
transactions contemplated hereby. The Project Sponsors promptly will notify the Bank in writing
if any such litigation or proceeding is commenced or threatened at any time during the term of this
Agreement.
F. To the maximum extent permitted by law, the Project Sponsors shall (i) defend,
indemnify and hold the Bank harmless from and against any and all liabilities, claims, or actions
arising out of or relating to the Projects, and (ii) shall take all actions necessary to effect the timely
-20-
and full collection and payment of all taxes and assessments owed by the owners of property in
the TIF and MID described in Section 3.2 of this Agreement during the term of the Loan.
G. If requested by the Bank, the foregoing warranties and covenants contained in this
Agreement shall be confirmed by a written opinion issued to the Bank by legal counsel for the
Project Sponsors in a form and with conclusions satisfactory to the Bank, which will be subject to
standard exceptions as to enforceability. Neith er Project Sponsor can give assurances regarding
the enforceability of Section 4.2.F and Article 7, except for the joint and severable liability
provisions.
Reimbursement of Bank
A. If the Bank determines at any time that any Disbursements or expenditures from
the Grant, Loan, or other sources of the Bank were made by it on the Projects were for costs or
expenses that were not Eligible Costs, were based on misstatements of fact by the Project Sponsors
or third parties engaged by the Project Sponsors, were for the collection or recovery of payments
owed to the Bank on the Loan, or were for work, services, or materials that do not meet the design
and construction specifications and standards of SCDOT and that have not been corrected to meet
those specifications and standards, unless such work, services or material s were procured by
SCDOT, the Bank, at its option, may require the Project Sponsors to reimburse the Bank for all
such costs and expenses and the Project Sponsors shall make such reimbursements to the Bank. In
the event that the Project Sponsors do not pay the full amount of the reimbursement to the Bank
within ninety (90) days of the date of the notification to the Project Sponsors by the Bank that such
reimbursement is due the Bank, the Project Sponsors’ obligation to reimburse the Bank shall be
subject to the provisions of S.C. Code Ann. § 11 -43-210 and Section 8.2 of this Agreement. In
lieu of requiring the payment of such reimbursement(s) by the Project Sponsors, the Bank may in
its discretion reduce the amount of the Grant described in Section 3.1 of this Agreement by the
amount of the reimbursement due the Bank under this S ection 4.3.A. The Project Sponsors are
each jointly and severally liable to the Bank for the obligations set forth in this S ection 4.3.A.
Notwithstanding the foregoing, the Bank a cknowledges that the Project Sponsors and the Owner
may negotiate among themselves regarding an alternative basis for the sharing of this obligation
-21-
between them in the Participation Agreement, the Development Agreement, or both such
documents, but this shall not affect the Project Sponsors’ obligations to the Bank. This Section 4.3
shall survive the termination of this Agreement.
B. If the Bank Board determines that (i) the Project Sponsors by their own acts or
omissions have abandoned the funding of the Exit #3 Proper Project or the commencement or
completion of the Parkway North Project, or any component thereof, at any time, (ii) the Project
Sponsors by their own acts or omissions have failed to provide funding for the Exit #3 Proper
Project as required by this Agreement or pursue the commencement or completion of the Parkway
North Project, including all components, with due diligence after having received one written
warning notice from the Bank of such failure by the Project Sponsors no less than sixty (60) days
prior to issuance of the notification for reimbursement and the Project Sponsors thereafter fail to
commence and maintain funding of the Exit #3 Proper Project or pursuit of commencement or
completion of the Parkway North Project, including all components, with due diligence during that
sixty (60) day period, or (iii) the Project Sponsors by their own acts or omissions fail to complete
and open to the public the Parkway North Project, including all components, prior to the date the
Exit #3 Proper project is completed, the Project Sponsors shall reimburse the Bank fully for all
Disbursements within ninety (90) days of the date the last Project Sponsor receives notification
from the Bank that such reimbursement is due the Bank and stating the reason(s) for such
reimbursement. Further, in that event, all Disbursements for the Projects shall cease, and the Bank
shall have no further obligations to the Project Sponsors under this Agreement. If the Project
Sponsors fail to make such reimbursements in full to the Bank within that ninety (90) day period,
the Project Sponsors’ obligation to reimburse the Bank shall be subject to the provisions of S.C.
Code Ann. § 11-43- 210 of the Act and Section 8.2 of this Agreement. In the event exigent
circumstances prevent the Project Sponsors from commencing or completing the Parkway North
Project by the date identified above, the Bank may in its discretion, but is not required to, grant an
extension for the commencement or completion of those projects on such terms and conditions as
it may determine.
C. The Project Sponsors shall reimburse the Bank promptly for all reasonable costs
and expenses incurred by the Bank in responding to requests for records and information submitted
-22-
to it pursuant to the South Carolina Freedom of Information Act (“FOIA”) relating to the Project
after the Bank provides the Project Sponsors a written itemization of such costs and expenses and
a copy of the request. Prior to seeking reimbursement from the Project Sponsors, the B ank will
make a reasonable effort to collect such costs and expenses from the person or entity requesting
such records or information pursuant to the FOIA.
Project Reporting
The Project Sponsors shall report in writing to the Bank at least quarterly on the status of
the Projects, including, but not limited to, reports on the status of design, right-of-way acquisition,
environmental approvals, construction, scheduled draw requests, costs to date, estimated costs to
complete the Projects, changes to the Projects, and any other matters identified or requested by the
Bank. The reports shall be in a form acceptable to the Bank. The obligation of the Project Sponsors
to report on the Exit #3 Proper Project shall cease upon the Project Sponsors’ providing the Bank
a letter from SCDOT confirming it has assumed responsibility for that Project.
The Project Sponsors shall report, or cause the Owner to report , in writing to the Bank at
least quarterly on the status of the Parkway South Project, including, but not limited to, reports on
the status of design, right -of-way acquisition, environmental approvals, construction, project
changes, and any other matters identified or requested by the Bank. The reports shall be in a form
acceptable to the Bank.
The Project Sponsors may agree between themselves that one of them will be responsible
for the reporting required by this section with respect to the Projects.
Amendments or Revisions to Development Agreement
The City shall not amend, modify or revise the Development Agreement, or allow such
amendment, modification or revision, that in any way affects the obligations of the Project
Sponsors or the Owner to the Bank under this Agreement, the Loan Agreement , or the
Development Agreement as it relates to this Agreement or the Loan Agreement without first
providing the Bank thirty (30) days prior written notice thereof and obtaining the prior written
-23-
consent of the Bank to the amendment, modification or revision. Any such amendment,
modification or revision, whether or not approved or agreed to by the City, that does not receive
the prior written consent of the Bank under this Section 4.5 is void and unenforceable. This Section
4.5 shall remain in effect until the Project Sponsors and Owner fully satisfy all of their obligations
to the Bank under this Agreement, the Loan Agreement and the Development Agreement. Th e
reference in this Section 4.5 to the obligations of the Owner includes the Owner Financial
Assistance Obligations.
PROJECT ADMINISTRATION AND RELATED MATTERS
Project Administration.
A. Exit #3 Proper Project . SCDOT shall administer the Exit #3 Proper Project
pursuant to an Agreement between the Bank and SCDOT. The Project Sponsors, after consultation
with the Owner, reserve the right to review and consent to the costs of the Exit #3 Proper Project
after the bids are received by SCDOT for the Exit #3 Proper Project. Concurrently, SCDOT
reserves the right upon receipt to analyze the bids for responsiveness (irregularities) and will notify
the City, the County, the Owner, and the Bank if irregularities are found. The City’s and County’s
consent to the costs must be given to SCDOT within fifty (50) calendar days of the receipt of the
bids by SCDOT. If such consent is not given in writing by the City and the County within that
time, SCDOT shall reject all bids for the Exit #3 Proper Project and cancel the procurement. If the
City, County, Owner, and Bank agree in writing, SCDOT will rebid the Exit #3 Proper Project a
second time under mutually agreeable terms acceptable to it and the Parties. If such consent is not
given on the first procurement or a second procurement (a rebid) is not successful for any reason,
the City and County shall reimburse the Bank within thirty (30) calendar days of the cancellation
of the first procurement or second procurement for all Disbursements made on the Projects from
the Grant and the Loan, and the Bank shall cancel all Financial Assistance on the Projects and all
monies remaining in the accounts held by the State Treasurer’s Office pursuant to Section 3.2 A
and B shall be released to the County and Owner, respectively. Prior to the remitting of such funds
by the State Treasurer’s Office, all payments due to SCDOT to close out all contracts related to
-24-
the preliminary engineering, initial permitting and related costs for the Exit #3 Proper Project shall
be made. If consent is given by the City and County, the consent does not alter, amend or limit the
funding responsibilities of the City and County set forth in the Loan Agreement or this Agreement
including coverage by the City and County of any Cost Overruns. SCDOT will install signage on
City right-of-way as part of the Exit #3 Proper Project as necessary and consistent with the traffic
plan in the Interchange Justification Report, and any approval or consent required from the City
for such installation will not be unreasonably withheld. The reimbursement and payment
obligations set forth above in this Section 5.1.A shall survive the termination of this Agreement.
In addition to the foregoing, within the same fifty (50) calendar day period of time if the
City and County consent to the costs of the successful bid that is in excess of $45,604,000, the
City and County also shall enter a binding obligation with the Bank in a form and with contents
acceptable to the Bank to provide the funds to cover any and all costs of the Exit #3 Proper Project
in excess of the estimated costs of $45,604,000.
B. P
arkway North Project . The City shall administer the Parkway North Project, which
is a portion of Purrysburg Road. The design and construction of the Parkway North Project must
conform with SCDOT standards, specifications, and requirements and with the traffic studies used
for the approval of the Interchange Justification Report. The City shall be responsible for all
engineering, right-of-way acquisition, and construction for the Parkway North Project and may
perform all or any part of the work with its own forces or may contract out any of the work or
services to private or governmental providers or contractors should it determine that such
contracting out would be more efficient or would result in more timely completion of the Parkway
North Project. The City shall enter into c ontracts in its own name. All rights -of-way shall be
acquired in the name of the City, and the laws and procedures of the State of South Carolina for
acquiring rights -of-way shall apply and be followed. SCDOT shall quitclaim to the City any
portions of Purrysburg Road that it may own as set forth in Section 3.2.D of this Agreement. The
City shall own and maintain the Parkway North Project and Purrysburg Road after completion of
construction of the Parkway North Project. All work, services and materials used on the Parkway
North Project shall conform with SCDOT standards, specifications, and requirements as if it were
administering the Parkway North Project. The Project Sponsors shall complete the Parkway North
-25-
Project and open the Parkway North Pr oject for public use upon such completion which must be
no later than the date that the Exit #3 Proper Project is open to public use.
C. Parkway South Project. The Owner, in cooperation with the City, shall administer the Parkway
South Project, which is a portion of Purrysburg Road. The design and construction of the Parkway
South Project must conform with the standards, specifications, and requirements of SCDOT and
the Interchange Justification Report. The Owner shall be responsible for all engineering, right-of-
way acquisition, and construction for the Parkway South Project. The Owner shall enter into
contracts in its own name. All rights -of-way shall be acquired in the name of City and the laws
and procedures of the State of South Carolina for acquiring rights-of-way shall apply and be
followed. SCDOT will quitclaim to the City any portions of Purrysburg Road that it may own as
set forth in in Section 3.2.D of this Agreement. Prior to 120 days from the Exit #3 Proper Project
Bid Date, the City shall conv ey to by quitclaim deed to SCDOT that portion of Purrysburg Road
which is within the Exit #3 Proper Project, as shown on the approved right-of-way plans. The City
shall own and maintain the Parkway South Project and Purrysburg Road (excluding the portion
within the Exit #3 Proper Project) after completion of construction of the Parkway South Project.
All work, services and materials used on the Parkway South Project shall conform with SCDOT
standards, specifications, and requirements as if it were administering the Parkway South Project
and the Interchange Justification Report. In addition to any other sections of this Agreement
expressly made applicable to the Parkway South Project, the provisions of Sections 5.4, and 5.5 of
this Agreement shall be applicable to the Parkway South Project. The Owner shall complete the
Parkway South Project and open the Parkway South Project for public use upon such completion
which must be no later than the date that the Exit #3 Proper Project is open to public use. The City
shall be responsible to the Bank for ensuring that the Owner complies with all obligations in this
Agreement that are applicable to the Parkway South Project. The Bank shall not provide Financial
Assistance of any kind to the Parkway South Project.
Scope of Projects
The scope of work of the Projects and the Parkway South Project shall be as set forth in
the definition of each of those projects in Section 1 of this Agreement and shall comply with the
-26-
Interchange Justification Report. A material change in the scope of the Exit #3 Proper Project
shall require the approval of the Bank Board, SCDOT and Project Sponsors and be stated in an
amendment to this Agreement. For purposes of this Section 5.2, “material change” means a change
in the scope of the Exit #3 Proper Project: (a) that requires a revision of the Record of Decision or
other approvals issued by Federal Highway Administration for the Exit #3 Proper Project, the
permit(s) issued by the U.S. Army Corps of Engineers for the Exit #3 Proper Project , or the
permits, approvals or authorizations required for the Exit #3 Proper Project issued by other Federal
or state agencies, including the Interchange Justification Report, but only if such changes alter the
overall design or purpose of the Exit #3 Proper Project; (b) that does not comply with SCDOT’s
standards, specifications and requirements or the Interchange Justification Report ; or (c) that
materially changes the overall design or scope of the Exit #3 Proper Project, which alone or
together with other material changes as defined in Section 5.2, increases the costs of the Exit #3
Proper Project beyond the estimated costs of $ 45,604,000 set forth in Section 3.1 of this
Agreement or the higher cost of the Exit #3 Proper Project established by the process in Section
5.1 of this Agreement , whichever is applicable. Except as provided above in (a), (b), and (c) of
this Section 5.2, change orders may be executed by SCDOT for items necessary to complete the
Exit #3 Proper Project without the consent of the Project Sponsors or Bank. Notwithstanding the
above provisions in Section 5.2, no consent from the Project Sponsors relating to increased costs
for the Exit #3 Proper Project is required to implement or enforce the obligation of the Project
Sponsors to pay for Cost Overruns for the Exit #3 Project as set forth in this Agreement so long as
the Cost Overrun is not caused by one or more of the material changes set forth in (a), (b) , or (c)
above in this Section 5.2. The Bank acknowledges that the Project Sponsors and the Owner may
negotiate among themselves an alternative basis for the sharing of the Cost Overrun obligations in
the Participation Agreement, the Development Agreement or both such documents, but this shall
not affect the Project Sponsors’ Cost Overrun obligations in this Agreement and the Loan
Agreement.
Ownership and Maintenance of Projects.
Upon completion and acceptance of the Exit #3 Proper Project by SCDOT, SCDOT shall
maintain the Exit #3 Proper Project. The City shall own and be responsible for and provide
-27-
maintenance for the Parkway North Project, Parkway South Project, and Purrysburg Road after
completion of the Parkway South Project and Parkway North Project and shall provide the Bank
and SCDOT a written commitment confirming its obligations to maintain the Parkway North
Project, Parkway South Project and Purrysburg Road.
The City and Owner, respective ly, shall solicit contractor, construction and consultant
services and materials needed to complete the Parkway North Project and Parkway South Project
by the procurement methods they deem will result in the selection of the best qualified firms and
vendors, the lowest responsible contract price, and the best value for the projects as long as the
City or Owner, respectively, is authorized by law to employ such methods. Contract forms shall
be design-build, design-bid-build, or any other form or combination of forms that are permissible
by law that the City and Owner, respectively, determine will result in the most cost- effective,
efficient, and timely delivery and completion of the Parkway North Project and Parkway South
Project.
Bonds and Insurance
The City and Owner, respectively, shall require that the contractor(s) for the Parkway North
Project and Parkway South Project provide and maintain throughout the life of the construction
the same types and amounts of payment bonds, performance bonds, and insurance coverages that
SCDOT usually requires from contractors on comparable projects that it manages. To the extent
available and at a cost not to exceed $10,000, the Bank shall be made an additional obligee on the
performance bond(s) for the Parkway South Project.
The City and Owner, respectively, shall require, or cause the general contractor to require,
that subcontractors, engineering or design firms, and other vendors and providers on the Parkway
North Project and Parkway South Project provide and mainta in the same types, duration and
amounts of payment bonds, performance bonds, and insurance coverages that SCDOT usually
requires from subcontractors, engineering or design firms, and other vendors and providers on
comparable projects it manages.
-28-
The City shall provide, or cause to be provided to, the Bank proof of such required bonds
and insurance coverages prior to each respective contractor, subcontractor, engineering or design
firm, vendor and provider commencing the provision of services or materials on the Parkway North
Project and Parkway South Project. The City shall certify to the Bank in writing between July 1
and July 30 of each year during the life of the Parkway North Project and Parkway South Project
that all such required bonds and insurance coverages remain in force. The City shall promptly
notify the Bank in writing if any required bonds or insurance coverages lapse or are terminated.
The Bank may decline to make payments or Disbursements for any services or materials provided
by any contractor, subcontractor, firm, vendor or provider on the Parkway North Project on which
any required bonds or insurance coverages have lapsed or been terminated until such lapse or
termination is corrected to the satisfaction of the Bank.
Upon request, the City promptly shall provide, or cause to be provided to, the Bank copies
of any required bonds and any certificates or policies for any required insurance coverages.
CONDITIONS TO BANK’S DISBURSEMENTS AND DRAW REQUESTS
Draw Requests on Parkway North Project
The Bank’s obligation to make Disbursements for Eligible Costs of the Parkway North
Project arises only upon the Bank’s receipt, review and approval of a written draw request from
the City, which draw request shall be in a form approved by the Bank, and is further conditioned
upon all of the following conditions being met:
A. No lien or other interest may have attached to a Contract or the Parkway North
Project, nor to any rights-of-way, real property or improvements related thereto.
B. Construction of the completed portions of the Parkway North Project described in
the applicable Contract shall have been carried out substantially in accordance with the applicable
plans, standards and specifications.
-29-
C. No event of default exists under this Agreement, the Loan Agreement, or any
related agreement with the Bank, or any Contract.
D. No event or condition shall have occurred or arisen which prevents the Bank from
obtaining funds sufficient to complete its Financial Assistance to the Parkway North Project, and
no funding or payment obligations under this Agreement, including those in Section 3.2 of this
Agreement, have failed to be provided on the schedule approved by the Bank.
E. The Project Sponsors have fulfilled all of the warranties, covenants and obligations
set forth in this Agreement, including, but not limited to those in Section 3.2 of this Agreement
that are conditions precedent or contingencies to Disbursements from the Grant.
F. The City shall have certified that the entire payment applied for in the draw request
is for Eligible Costs of the Parkway North Project and that the design, work, and materials used in
that portion of the Parkway North Project comply with the terms of applicable Contracts, the
approved plans, and the applicable standards of SCDOT.
G. The following conditions have been met, satisfied, or otherwise agreed to:
i. The Project Sponsors have entered into and executed all agreements,
instruments, documents, provisions and terms deemed necessary by the
Bank.
ii. Any material change in scope of the Parkway North Project has been
approved by Bank and SCDOT, this Agreement has been modified or
amended as determined necessary by the Bank, and additional approvals
from the JBRC or other governmental entities have been obtained as
determined necessary by the Bank.
iii. The Project Sponsors warrant that no litigation, nor any proceeding before
any governmental agency involving either of them or the Owner is pending,
or to the knowledge of the Project Sponsors, threatened, in which any
potentially adverse outcome would have a materially adverse impact on the
-30-
ability of the Project Sponsors or Owner to meet their obligations under this
Agreement, Loan Agreement or Development Agreement.
Costs Not Paid or Reimbursed on Parkway North Project
The Bank will not make Disbursements for or pay or reimburse expenses, expenditures or
costs from the Grant or Loan for the following purposes which are hereby deemed not to be
Eligible Costs under this Agreement or for the Parkway North Project. This section shall survive
the termination of this Agreement:
A. Any costs, expenses, expenditures, attorneys’ fees, damages, awards, judgments or
settlements arising from, or alleged to arise from, claims, or legal, judicial or administrative actions
or proceedings of any kind, asserted under or related to any Federal, state, local or government
agency law, ordinance, regulation or any permitting process; for condemnations; inverse
condemnations; regulatory takings; physical takings; trespasses; nuisances of any kind; flooding;
damages to real or personal property or interests of any kind; diminutions in real or personal
property values; loss of road, street, highway or other access; environmental, wetlands, water,
noise, visual, odor or simil ar damages or impacts; similar demands, assertions or allegations; or
payments or obligations established under any compensation programs or plans established by the
Project Sponsors, SCDOT or any other entity.
B. Any costs, expenses, expenditures, attorneys’ fees, damages, awards, judgments or
settlements arising from, or alleged to arise from, any claims, disputes, proceedings, or lawsuits of
any kind, including disputes between the Project Sponsors and SCDOT.
C. Landscaping and beautification for the Project other than for required grassing or
other erosion control measures or replacement or repair of trees, vegetation or landscaping affected
by construction of the Parkway North Project.
D. Excessive or unreasonable attorneys’, engineering or other professional fees or
expenses based on the lesser amount of reasonable fees and expenses as determined by applicable
-31-
industry standards or what South Carolina state agencies, including SCDOT and the South
Carolina Attorney General’s Office, usually pay or authorize for such services, fees, and expenses.
E. Any costs that are not for the actual construction of the Parkway North Project such
as permitting costs, right-of-way costs, or preliminary engineering costs.
Section 6.3 Exit #3 Proper Project
The procedures and provisions for Disbursements on draw requests submitted by SCDOT
to the Bank on the Exit #3 Proper Project shall be set forth in the SCDOT Intergovernmental
Agreement. The Bank or SCDOT will provide the Project Sponsors copies of the draw requests
submitted by SCDOT. The Project Sponsors may in good faith object based on the provisions in
this Agreement to a draw request by submitting a written explanation to the Bank and SCDOT
within seven (7) days of the receipt of a copy of the draw request. The Bank with S CDOT’s
assistance shall review the objection in good faith and advise the Project Sponsors of their decision
on the objection. The decision of the Bank and SCDOT on the objection is final.
INDEMNIFICATION OF BANK
To the maximum extent permitted by the law of South Carolina, the Project Sponsors shall
defend, indemnify and hold the Bank and its Board members, officers and employees harmless
from and against any and all liabilities, claims, actions, damages, judgments and attorneys’ fees
and related expenses and costs in any way arising out of or relating to: (i) the design, location,
construction, modification, funding, pursuit, implementation, completion or operation of the
Projects, the Parkway South Project, or any portion or component thereof; (ii) this Agreement, the
Loan Agreement, or any contract; or (iii) the selection, use or payment of persons or firms for
design, construction, modification, or operation of the Projects, the Parkway South Project, or any
portion or component thereof. In the event the Project Sponsors do not pay the full amount of any
such indemnification to the Bank for any reason within ninety (90) days of the date of the
notification to the Project Sponsors that such indemnification is due the Bank, the Project
Sponsors’ obligation to pay the Bank under this section shall be subject to the provisions of S.C.
-32-
Code Ann. § 11-43-210 and Section 8.2 of this Agreement. In lieu of requiring such payment by
the Project Sponsors as described above, the Bank may in its discretion reduce the amount of the
Grant or Loan by the amount of the costs and expenses incurred as a result of the matters described
above in this section. The Projects Sponsors are each jointly and severally liable to the Bank for
the obligations set forth in this section . This Article 7 shall survive the termination of this
Agreement.
BANK’S RIGHTS AND REMEDIES
Events of Default as to the Project Sponsors
With the exception of the Owner’s obligations with respect to the Parkway South Project,
in the event either of the Project Sponsors or the Owner violate or fail to comply with any provision
in or obligation under this Agreement (including other agreements and obligations incorporated
herein) or the Loan Agreement and if such failure continues fo r a period of thirty (30) days after
receipt of a written notice of such default from the Bank, such failure shall constitute an Event of
Default by the Project Sponsors under this Agreement. The Events of Defaults of this Agreement
also shall include thos e Events of Default in Section 7.1 of the Loan Agreement which is
incorporated herein by reference. For the avoidance of doubt, the Owner’s failure to perform any
of its obligations with respect to the Parkway South Project shall not constitute an Event of Default
by the Project Sponsors. For the avoidance of doubt, the Owner’s failure to perform any of its
obigations with respect to the Parkwa y South Project shall not constitute an Event of Default by
the Project Sponsors. The failure by either Project Spo nsor to appropriate funds to satisfy any of
its obligations under this Agreement also shall constitute an Event of Default under this Agreement
if not cured by that Project Sponsor within the thirty (30) day period described above in Section
8.1.
-33-
Remedies as to the Project Sponsors
Whenever any Event of Default occurs, any one or more of the following remedies may be
pursued by and shall be available to the Bank against the Project Sponsors in addition to those
provided in other sections of this Agreement:
A. As to any Event of Default, any obligation, act or duty the Project Sponsor(s) or the
Owner failed to perform shall be deemed a ministerial act and subject to the remedies of mandamus
and mandatory injunction requiring the Project Sponsor(s) to perform the obligation or duty, and
the Bank shall be deemed to have no adequate remedy at law for such Event of Default.
B. Among other rights and remedies available to the Bank following an Event of
Default, the Bank shall have the right to cease making any f urther Disbursements under this
Agreement or Loan Agreement with respect to the Projects until such Event of Default has been
cured and the right to require the Project Sponsors to reimburse it for any or all Disbursements on
the Projects. The Bank shall also have and may pursue any other remedies available under South
Carolina law, including the enforcement of any remedies against any legally available funds of the
Project Sponsors, except as such remedies may be expressly limited by the specific provisions of
this Agreement which includes, but is not limited to, all funds appropriated or authorized in any
way by the Project Sponsors for the Projects.
C. In addition to the remedies available to the Bank set forth in this Agreement for an
Event of Default, the Bank also shall have the right to exercise the remedies set forth in Section
7.2.A. of the Loan Agreement.
D. The Project Sponsors shall pay the Bank t he reasonable attorneys’ fees and
expenses incurred by the Bank in pursuing any remedy for an Event of Default.
E. In the event a Project Sponsor fails to make any payment or reimbursement to the
Bank in full as required by this Agreement or the Loan Agreement, it acknowledges the authority
of the State Treasurer under S.C. Code Ann. § 11- 43-210 to withhold funds allotted or
appropriated by the State of South Carolina to the Project Sponsor and to apply those funds to
-34-
make or complete any such payment in full to the Bank. T he Project Sponsors agree that the
current provisions of Section 11-43-210 are hereby incorporated into this Agreement verbatim as
an independent and separate contractual obligation of the Project Sponsors and shall be enforceable
against the Project Sponsors and survive even if S.C. Code Ann. § 11- 43-210 is repealed or its
application is reduced or amended by action of the General Assembly, or it is otherwise abrogated,
or its application is reduced or modified by a court or court decision. The Bank will notify the
Project Sponsors prior to requesting that the State Treasurer withhold such funds.
F. In consideration of the significant benefits to the City and County and their citizens
from the Grant and Loan from the Bank for construction of the Projects on which each is a Project
Sponsor, the City and County each acknowledges and agrees that it is jointly and severally liable
to the Bank for the payment of all financial obligations arising under this Agreement, and that such
liability is indepe ndent of and in addition to the obligations of the other Project Sponsor. The
foregoing notwithstanding, the Bank acknowledges that the City, the County, and Owner may
negotiate between themselves regarding an alternative basis for the sharing of any such liability
between them in the Participation Agreement, the Development Agreement, or both such
documents, but this alternative basis shall not affect the Project Sponsors’ joint and several liability
to the Bank. Each obligation, promise, covenant, representation, and warranty in this Agreement
shall be deemed to have been made by, and binding upon, eac h Project Sponsor. The Bank may
bring an action against either Project Sponsor, whether or not an action is brought against the other
Project Sponsor, provided, however, nothing contained in this Section shall prevent either Project
Sponsor from making the other a party to said action to the extent permitted by law or in equity.
Each Project Sponsor agrees that any release which may be given by the Bank to the other
Project Sponsor will not release such Project Sponsor from its obligations under this Agreement.
Remedies Cumulative; Non-waiver
All rights and remedies of the Bank provided for in this Agreement , the Loan Agreement
or in any other related document as to any party are cumulative, shall survive the termination of
this Agreement, and shall be in addition to any and all other related rights and remedies provided
for or available to the Bank at law, including those contained in the Act, or in equity. The exercise
-35-
of, or the failure to exercise, any right or remedy by the Bank shall not in any way constitute a cure
or waiver of an Event of Default or the waiver of any right or remedy available to the Bank, nor
invalidate any act done pursuant to any notice of the occurrence of an Event of Default.
GENERAL CONDITIONS AND PROVISIONS
Waivers
No waiver of any Event of Default by the Bank hereunder shall be implied from any delay
or omission by the Bank to take action on account of such Event of Default, and no express waiver
shall affect any event of default other than the Event of Default specified in the waiver and it shall
be operative only for the time and to the extent therein stated. Waivers of any covenants, terms or
conditions contained herein must be in writing and shall not be construed as a waiver of any
subsequent or other breach of the same covenant, term or condition. The consent or approval by
a Party to or of any act by another Party requiring further consent or approval shall not be deemed
to waive or render unnecessary the consent or approval to or of any subsequent or similar act. No
single or partial exercise of any right or remedy of a Party hereunder shall preclude any further or
later exercise thereof or the exercise of any other or different right or remedy by the Party.
Benefit and Rights of Third Parties
This Agreement is made and entered into for the sole protection and benefit of the Parties,
and their successors and assigns. Other than the Owne r solely as set forth below in Section 9.12
below, no other persons, firms, entities, or parties shall have any rights, or standing to assert any
rights, under this Agreement in any manner, including, but not limited to, any right to any
Disbursements at a ny time, any right to require any Party to apply any portion of the amounts
committed herein that have not been disbursed to the payment of any such claim, or any right to
require any Party to exercise any right or power under this Agreement or arising fro m any Event
of Default of any kind by either of the Project Sponsors . Nor shall any Party owe any duty or
have any obligation whatsoever to any claimant for labor or services performed or materials or
supplies furnished in connection with the Projects. Other than the owner, no other persons, firms,
-36-
entities, or parties shall, under any circumstances, be deemed to be a beneficiary of any conditions
or obligations set forth in this Agreement, any or all of which may be freely waived in whole or in
part by the Party at any time pursuant to Section 9.1 of this Agreement, if in its sole discretion, it
deems it desirable to do so.
No Liability of Bank
The Bank makes no representations and assumes no obligations or duties as to any person,
firm, entity, or party, including the parties to this Agreement, concerning the quality of the design,
construction, modification, completion or operation of the Projects, or any portion or component
thereof, or the absence therefrom of defects of any kind. The Bank and its Board members, officers
and employees shall not be liable in any manner to any person, firm, entity, or party, including the
parties to this Agreement, for the design, location, construction, modification, completion, or
operation of the Projects, or the fai lure to design, locate, modify, operate, complete, or construct
the Projects or any portion or component thereof, generally or in any particular manner. The Bank
shall not be liable in any manner on any Contract to which it is not a named party, the execution
of which has not been properly and duly authorized by the Bank Board, and that has not been so
executed by the Bank.
Assignment
The terms hereof shall be binding upon and inure to the benefit of the successors and
assigns of the Parties hereto; provided, however, the Project Sponsors shall not assign or delegate
this Agreement, any of its respective rights, interest, duties or obligations under this Agreement,
nor any Disbursements without the prior written consent of the Bank; and any such attempted
assignment or delegation (whether voluntary or by operation by law) without said consent shall be
void.
-37-
Captions
The captions herein are inserted only as a matter of convenience and for reference and in
no way define, limit or describe the scope of this Agr eement nor the intent or meaning of any
provision hereof.
Notices
All notices required to be given hereunder, except as otherwise provided in this Agreement,
shall be deemed effective when received by the other party, through certified mail, registered mail,
personal delivery, or courier delivery. All such notices shall be addressed to the Parties as follows:
City of Hardeeville
Mr. Michael Czymbor
City Manager
205 Main Street
Hardeeville, SC 29927
Jasper CountyAndrew P. Fulghum
County Administrator
P.O. Box 1149
Ridgeland, SC 29936
Chairman
South Carolina Transportation Infrastructure Bank
955 Park Street, Room 120B
Columbia, SC 29201
Amendments
Any amendment to this Agreement shall only be made through a written instrument duly
authorized and signed by each party hereto.
Savings Clause
Invalidation of any one or more of the provisions of this Agreement by any court of
competent jurisdiction shall in no way affect any of the other provisions hereof, all of which shall
remain, and is int ended by the Parties to remain, in full force and effect. Notwithstanding the
-38-
foregoing sentence, in the event that a court invalidates or modifies any one or more provisions,
in whole or in part, of this Agreement, the Bank may in its discretion terminate this Agreement by
providing notification of such termination to the Project Sponsors, and upon providing such
notification to the Project Sponsors, all of the Bank’s obligations under this Agreement shall
terminate immediately.
Execution in Counterparts
This Agreement may be executed in one or more counterparts, each of which shall be
deemed to be an original, but all of which shall constitute one and the same instrument, and in
making proof of this Agreement it shall not be necessary to produce or account for more than one
such fully executed counterpart.
Authority to Execute
By executing this Agreement, the undersigned each affirms and certifies that he or she has
authority to bind his or her principal thereto and that all necessary acts have been taken to duly
authorize this Agreement under applicable law.
Agreement Controls
In the event of any conflicts between the provisions of this Agreement and the provisions
of the Loan Agreement or the provisions of the Development Agreement relating to this
Agreement or the Loan Agreement, the provisions of this Agreement shall control.
Limited Third Party Beneficiary
Notwithstanding anything to the contrary contained herein, the Owner is a third- party
beneficiary solely to Sections 3.2, 5.1, 5.2, and 6.3 of this Agreement, but only to the extent that
the Project Sponsors have expressly stated rights under those Sections. No amendments or
modifications to those Sections in this Agreement shall be made without first obtaining the written
consent of the Owner which consent shall not be unreasonably withheld or delayed by the Owner.
-39-
A copy of any notices by any of the Parties under this Agreement shall be timely delivered to the
Owner.
[Separate Signature Page for Each Party Follows]
PPAB 8140012v11
SIGNATURE PAGE FOR THE CITY OF HARDEEVILLE
IN WITNESS WHEREOF, the City of Hardeeville has caused this Agreement to be
executed on its behalf and its seal to be affixed hereto.
CITY OF HARDEEVILLE, SOUTH CAROLINA
By:
(SEAL) Printed Name:
Title:
Attest:
By:
Printed Name:
Title:
Note: The execution of this Agreement was authorized and approved by Ordinance _____
adopted by the Hardeeville City Council on __________, 2023.
PPAB 8140012v11
SIGNATURE PAGE FOR JASPER COUNTY
IN WITNESS WHEREOF, Jasper County has caused this Agreement to be executed on its
behalf and its seal to be affixed hereto.
JASPER COUNTY, SOUTH CAROLINA
By:
(SEAL) Printed Name:
Title:
Attest:
By:
Printed Name:
Title:
Note: The execution of this Agreement was authorized and approved by Ordinance _____
adopted by the Jasper County Council on __________, 2023.
PPAB 8140012v11
SIGNATURE PAGE FOR BANK
IN WITNESS WHEREOF, the South Carolina Transportation Infrastructure Bank has
caused this Agreement to be executed on its behalf and its seal to be affixed hereto.
SOUTH CAROLINA TRANSPORTATION
INFRASTRUCTURE BANK
(SEAL) B y:
John B. White, Jr.
Chairman
Attest:
__________________________________
Robert E. Tyson, Jr.
Secretary
PPAB 8140012v11
Add and List Exhibits
A. Real Prope rty Description of TIF and MID
PPAB 10067145v2 6
EXHIBIT C
REDEVELOPMENT PLAN
Redevelopment Plan
Exit 3 Redevelopment Project
Area
City of Hardeeville, South Carolina
October 2, 2023
REDEVELOPMENT PLAN
EXIT 3 REDEVELOPMENT PROJECT AREA
CITY OF HARDEEVILLE, SOUTH CAROLINA
Introduction
The redevelopment project area (the "Exit 3 Redevelopment Project Area"), consisting of approximately
1,608.30 acres within the City of Hardeeville, South Carolina ("City") and more particularly described
below and on Exhibit A-l attached hereto, currently is vacant land, classified by the Jasper County
Property Assessor as Rural Agriculture. The proposed new Exit 3 interchange on 1-95 and the new
RiverPort Parkway described in and contemplated by this Redevelopment Plan will enhance accessibility
to the real property within the Exit 3 Redevelopment Project Area, will stimulate much-needed economic
growth and development in the Exit 3 Redevelopment Project Area and surrounding areas, will provide
multiple uses of real property located within the Exit 3 Redevelopment Project Area utilizing the
redevelopment opportunities and techniques provided by the Act (as defined below) and will be a tool to
address and improve many socioeconomic issues in the Exit 3 Redevelopment Project Area and
surrounding areas.
This Redevelopment Plan is created under the authority of and in accordance with Title 31, Chapter 6 of
the Code of Laws of South Carolina 1976, as amended (the "Act") and sets forth the program to be
undertaken to accomplish the objectives of improving those conditions within the Exit 3 Redevelopment
Project Area which qualifies it as an "Agricultural area" and a "Blighted area" (each within the meaning of
the Act) and includes estimated redevelopment project costs including long-term project maintenance,
as applicable, the anticipated sources of funds to pay such costs, the nature and term of any obligations
to be issued to finance such costs, the most recent equalized assessed valuation of the Exit 3
Redevelopment Project Area, an estimate as to the equalized assessed valuation after redevelopment,
and the general land uses to apply in the Exit 3 Redevelopment Project Area. The duration of the plan is
25 years.
The adoption of this Redevelopment Plan itself does not authorize the City to issue obligations secured
by incremental tax revenues generated from the real property within the Exit 3 Redevelopment Project
Area. The issuance of such obligations will require City Council of the City (the "City Council") to enact
an ordinance approving such issuance.
Boundaries of the Exit 3 Redevelopment Project Area
The Exit 3 Redevelopment Project Area consists of approximately 1,608.30 acres within the City.
A map of the Exit 3 Redevelopment Project Area, a legal description of the Exit 3 Redevelopment Project
Area, and a listing of real property parcels included within the Exit 3 Redevelopment Project Area are
shown in Exhibit A, Exhibit A-l and Exhibit A-2, attached hereto. The Exit 3 Redevelopment Project Area
comprises approximately 5.6 percent of the total acreage of the City.
2
Current Conditions in the Exit 3 Redevelopment Project Area; Qualification as Agricultural
and Blighted Areas
All parcels of real property within the Exit 3 Redevelopment Project Area are vacant and are classified by
the Jasper County Property Assessor as Rural Agriculture. The Exit 3 Redevelopment Project Area is an
"Agricultural area" and a "Blighted area" (each within the meaning of the Act) where redevelopment and
sound growth are being impaired by:
1. obsolete platting;
2. lack of necessary transportation infrastructure;
3. lack of water or wastewater;
4. lack of storm drainage facilities;
5. inadequate electric and natural gas energy services; and
6. lack of modern communications infrastructure.
All real property within the Exit 3 Redevelopment Project Area currently is owned by SLF lll-Hardeeville,
LLC (the "Owner"). It is expected that either the Owner or certain of its successors and assigns (in such
capacity, the "Developer") will develop the Exit 3 Redevelopment Project Area.
Redevelopment Projects and Estimated Redevelopment and Ongoing Maintenance Costs
The proposed redevelopment projects within the Exit 3 Redevelopment Project Area are as follows
(collectively, the "Redevelopment Projects"):
1. a new interchange at Exit 3 on 1-95, including all related drainage and storm water and
infrastructure (the "Exit #3 Proper Project");
2. an approximately 1.5-mile stretch of RiverPort Parkway north of 1-95, including all related
drainage and storm water infrastructure (the "Parkway North Project"); and
3. an approximately 4-mile stretch of RiverPort Parkway south of 1-95, including all related
drainage and storm water infrastructure (the "Parkway South Project").
The Redevelopment Projects will be publicly owned and will be located in the City. The majority of the
Redevelopment Projects will be located within the Exit 3 Redevelopment Project Area. The City Council
is making a specific finding that the portions of the Redevelopment Projects located outside of the Exit 3
Redevelopment Project Area benefit the Exit 3 Redevelopment Project Area.
It is expected that it will take approximately 5 years to complete the construction of the Redevelopment
Projects. It is further expected that (1) the Developer will be responsible for, or assist with, the design,
permitting and approvals of the Redevelopment Projects; (2) the South Carolina Department of
Transportation will be responsible for the construction of Exit #3 Proper Project; (3) the City will be
responsible for the construction of the Parkway North Project, and (4) the Developer will be responsible
for the construction of the Parkway South Project.
The estimated costs of the Redevelopment Projects are $99,893,373 and are more particularly shown on
Exhibit B attached hereto (the estimated costs do not include the costs for the portion of Parkway South
Project already completed).
3
The South Carolina Department of Transportation will be responsible for all long-term maintenance
obligations with respect to the Exit #3 Proper Project, and the City will be responsible for all long-term
maintenance obligations with respect to the Parkway North Project and the Parkway South Project. The
average annual, combined long-term project maintenance cost for the Parkway North Project and the
Parkway South Project is estimated by the City to be $854,102 calculated over a 30-year term and
assuming inflation.
Redevelopment Objectives
The redevelopment objectives of the City are summarized as follows and are described in more detail
below:
To redevelop agricultural properties to provide multiple uses thereof in order to enhance the
economy and tax base of local governments through the private development and
redevelopment of the Exit 3 Redevelopment Project Area, thereby promoting the welfare of the
public;
1.
To promote the welfare of the public by creating new jobs and enhancing the economic health
of the community through diversification of the economic base;
2.
To promote and protect the health, safety, and welfare of the public by creating connectivity
and improving transportation between the Exit 3 Redevelopment Project Area, the Port of
Savannah, the future Jasper Ocean Terminal and surrounding economic development projects;
To promote and protect the health, safety, and welfare of the public by enhancing mobility and
safety by means of alternative and more secure evacuation routes within the Exit 3
Redevelopment Project Area and surrounding areas; and
To promote and protect the health, safety, and welfare of the public by avoiding major traffic
disruptions within the Exit 3 Redevelopment Project Area and surrounding areas in light of the
projected insufficiency of Exit 5 of 1-95 to accommodate anticipated traffic.
3.
4.
5.
The Redevelopment Projects are necessary to accomplish the redevelopment objectives. It is anticipated
that, as a result of the Redevelopment Projects, a combination of private investments and public
investments will achieve the objectives.
Enhancement of the Economic and Tax Base and Job Creation
The Redevelopment Projects are expected to create positive economic outcomes for the City, Jasper
County, South Carolina (the "County"), and neighboring communities along the 1-95 corridor in South
Carolina. On a broader scale, the Redevelopment Projects will improve intermodal activity associated
with the Port of Savannah, the future Jasper Ocean Terminal, and surrounding economic development
projects by improving the mobility of freight, passenger, and commercial traffic along the 1-95 and US 17
corridors.
Specifically, the Redevelopment Projects are expected to improve reliability and reduce delay along the
1-95 corridor associated with the expected increased traffic from the regional economic development
projects and the future Jasper Ocean Terminal project, providing safe new infrastructure purposed with
4
supporting intermodal activity, moving of freight, eliminating bottleneck conditions and causing a ripple
effect of improved travel.
The future Jasper Ocean Terminal project is expected to create more than 900 jobs directly and indirectly
for the construction of the port and related infrastructure alone, generating more than $210 million in
wages. More than 1,000 indirect jobs are projected in the creation of the access road and new rail
infrastructure for the project alone which would mean that nearly 2,000 newly created high paying jobs
will impact the region upon early development. The Redevelopment Projects are material to the success
of the Jasper Ocean Terminal project.
The City is experiencing a period of significant expansion and has had the highest growth percentage in
the state over the last several years. The addition of Hardeeville Commerce Park, Waste Management,
North Signal Capital, and the Jasper Ocean Terminal project, has heightened the expectation of job growth
for those in the City and surrounding area communities. Not only will the Redevelopment Projects provide
the workforce with shorter commutes, but household income will increase thereby improving the
socioeconomic conditions for themselves and their families.
Independently, the Redevelopment Projects will have a beneficial economic impact on employment
within the Exit 3 Redevelopment Project Area and surrounding areas within the City as quality jobs and
wages will be created during the construction period. The Redevelopment Projects will generate
temporary direct construction jobs for the building of the new Exit 3 interchange, bridges, and roadway.
In addition to direct construction jobs, additional indirect and induced jobs will be created by firms that
produce materials, equipment, and services needed for the construction of the Redevelopment Projects.
Wages earned by direct and indirect workers will be spent in the local economy on goods and services,
resulting in additional local job creation.
Mobility Enhancement
The Redevelopment Projects will (1) improve safety along each of the corridors, as they will help reroute
traffic from industrial/commercial development along US 17 and projected traffic from the future Jasper
Ocean Terminal location; and (2) reduce the congestion, safety and mobility along 1-95 with a more
modern and specifically designed interchange, better equipped to support the various types of vehicles
egressing on and off the interstate near or around the City. Diverting traffic away from downtown
Hardeeville and Exit 5 Interchange will help to relieve existing congestion and traffic problems along this
poorly operating interchange.
The Redevelopment Projects will improve intermodal infrastructure for the Port of Savannah along with
both regional and national freight mobility through the Interstate system and improvements to the
existing rail services. The Redevelopment Projects are expected to improve local mobility for all modes of
travel along the 1-95 and US 17 corridors and not only improve conditions for outbound travel but also
improve travel alternatives for visitors to enjoy the City and its surrounding area tourist attractions.
Without the Redevelopment Projects, major traffic disruption will negatively impact the Exit 3
Redevelopment Project Area and neighboring communities. Among the purposes of the Redevelopment
Projects is to improve mobility and accessibility not only for freight across the region, but also local
residents and visitors who need to travel safely and efficiently between home, work, school and daily
5
activities. The Redevelopment Projects will also link potential employees with increased employment
opportunities and create additional services for the community.
Increased freight traffic can be reasonably expected as a result of the following:
• The South Carolina General Assembly recently approved Trucking Tax Credit legislation to
encourage new manufacturers to utilize the Charleston Port.
• A significant part of the County, and all of the area within the City, has been identified as an
Opportunity Zone. The Opportunity Zone program was designed to drive long term capital to
rural and low-income urban communities by utilizing tax incentives to encourage private
investment in these communities. Opportunity Zone investors have already made significant
investments in the area.
• Strong commercial growth in the Savannah market, particularly in the areas of logistics,
distribution and light warehousing, is encouraging imminent growth in this region.
Ultimately, the Redevelopment Projects will directly improve the efficiency and reliability of the surface
transportation system within the Exit 3 Redevelopment Project Area, regionally and nationally as well as
provide improved access from the Exit 3 Redevelopment Project Area and surrounding communities to
key transportation infrastructure such as the Savannah/Hilton Head National Airport, Port of Savannah
and CSX Railroad. By improving the connections between economic development properties and the
future Jasper Ocean Terminal project with the interstate system, the Redevelopment Projects will aid in
the reduction of anticipated congestion along the 1-95 corridor as well as facilitate more efficient
interstate access for the region.
Safety Outcomes
The Redevelopment Projects will provide a safer and more modern design allowing improved accessible
alternatives for the 1-95 corridor with the anticipation of the increased volumes of traffic associated with
the economic development properties and the future Jasper Ocean Terminal project. The Parkway North
Project is expected to include one rail grade separation component at crossing 632464A. This separation
is a significant need as the master plan includes more than 2,000 acres just north of the crossing for the
residential village growth and development. This development will increase the amount of traffic crossing
the main CSX north and south trunk line. The new Exit 3 interchange will also reduce risks of various tractor
trailer incidents as the result of congested or poorly designed interchanges. Additionally, the
Redevelopment Projects will allow enhanced reliability in emergency vehicle response time to better
serve the Exit 3 Redevelopment Project Area, the surrounding properties and the future Jasper Ocean
Terminal project.
The improved accessibility on and off the Interstate system in the southern tip of South Carolina is also
essential during emergency and mandatory evacuations from hurricanes targeting the east coast. Traffic
problems were clearly noted during Hurricanes Matthew and Irma, where evacuees were slowed due to
the increased congestion of traffic along 1-95 crossing the Savannah River from Georgia into South
Carolina. Even though the Redevelopment Projects will not relieve all congestion along the 1-95 corridor
as much of the problem is associated with widening 1-95, the new Exit 3 interchange will provide quicker
accessibility to US 17, US 321 and US 278 which serve as South Carolina Evacuation Routes.
6
Anticipated Sources of Funds to Pay the Costs of Redevelopment Projects
The anticipated sources of funds to pay the costs of the Redevelopment Projects are a combination of a
grant made by South Carolina Transportation Infrastructure Bank (the "SCTIB") to the City and the County;
a loan made by the SCTIB to the City and the County (the "SCTIB Loan") or the issuance of other obligations
by the City; a cash contribution from Jasper County, utilizing Transportation Tax proceeds; and private
investments and contributions as described in greater detail in the table below.
The proceeds of SCTIB grant are expected to be used to pay for a portion of the costs of the Exit #3 Proper
Project and the Parkway North Project.
The proceeds of the SCTIB Loan are expected to be used to pay for a portion of the costs of the Exit #3
Proper Project.
The proceeds of the cash contribution from Jasper County are expected to be used to pay for a portion of
the costs of the Exit 3 Proper Project and the Parkway North Project.
The Developer is expected to (1) pay all pre-construction costs to obtain the necessary approvals and
permits to construct the Redevelopment Projects; (2) provide or pay for the Parkway South Project; and
(3) provide necessary easements and rights of way for the Redevelopment Projects.
Redevelopment Project Area Sources and Uses of Funds
The following table provides the expected sources and uses of funds for the Redevelopment Projects.
7
Table 1: Expected Sources and Uses of Funds
Sources of Funds or Contribution Uses of Funds or Contribution
Estimated
Amount or
Estimated
Value Uses
Estimated
Cost or
Estimated
ValueSources
Cash or Similar Contributions:
SCTIB Grant*
SCTIB Loan**
Jasper County Cash Contribution
City Contribution***
Owner Cash Contribution
Owner's Payment for Parkway South
Total Cash or Similar Contributions
Redevelopment Projects:
$28,100,000 Exit 3 Proper
$18,240,000 Plans & Engineering Exit 3 Proper Project
$13,500,000 Land (estimated value)
$4,164,587 Construction Exit 3 Proper Project
$3,100,000 Exit 3 Proper Project total
$29,104,786 Parkway North Project
$96,209,373 Land (estimated value)
Construction Parkway North Project
Parkway North Project total
$3,684,000 Parkway South Project
Design and Engineering Parkway South
Land (estimated value)
Construction Parkway South Project
Parkway South Project total
$3,400,000
$1,008,000
$45,604.000
$50,012,000
$1,200,000
$13,936.000
$15,136,000Other:
Owner Contribution of Land for Public ROW****
$1,819,049
$1,476,000
$27,285,737
$30,580,786
$4,164,587Costs relating to multiple Redevelopment Projects*****
$99,893,373 Total Uses of Funds or Contributions $99,893,373Total Sources of Funds or Contributions
*No portion of the proceeds of the SCTIB Grant or SCTIB Loan shall be used to fund the Parkway South Project or
for payment for the public right of way.
**An additional up to $9,860,000 in SCTIB Loan proceeds are available to pay for costs of the Exit #3 Proper Project
to the extent that the total cost of the Exit #3 Proper Project (excluding the land contribution) is greater than the
estimated amount specified in the table above, subject to the satisfaction of certain conditions.
***The City entered into a memorandum of understanding with Owner in October 2018 (which has been amended
from time to time) for the reimbursement of certain City expenditures related to the Exit 3 Proper Project and the
design and engineering for the Parkway North Project. To date, the City has been reimbursed a total of $751,090 for
certain payments that the City has made.
****The estimated value of the land to be contributed for the public right of way represents the value of the
contributed real property expected to be specified in an amendment to the Development Agreement (defined
below) by and between the City and SLF lll-Hardeeville, LLC.
*****The City has entered into an agreement with Stantec, an engineering firm, to provide services relating to
multiple Redevelopment Projects. The City has estimated that the total cost of these services from Stantec, a portion
of which have been completed, will equal the amount shown.
8
Nature and Term of Any Obligations to be Issued to Finance Redevelopment Project Costs
The SCTIB Loan (together with any tax increment bonds or other obligation issued by the City to finance
or refinance costs of any of the Redevelopment Projects, the "Obligations") is expected to fund a portion
of the costs of the Exit #3 Proper Project.
The maximum amount of the Obligations (without duplications for the amount of Obligations that refund
previously issued Obligations) will not exceed $37,500,000, and the maximum term of the Obligations will
be 30 years; provided that the SCTIB Loan will mature no more than 15 years after the date of the first
draw of proceeds under the SCTIB Loan.
It is anticipated that the SCTIB Loan will be secured, in part, by and be payable from the following and in
the following order of priority: (1) first, 35% of the incremental tax revenues generated within the Exit 3
Redevelopment Project Area ("Pledged TIE Revenues"), (2) second, funds on deposit in a debt service
reserve fund to be established in connection with the closing of the SCTIB Loan, which is anticipated to be
in the initial amount of $3,531,640, and (3) third, revenues generated from assessments levied on taxable
property within the Exit 3 Municipal Improvement District (as described below) which the City anticipates
creating prior to the closing of the SCTIB Loan and which will include the same property included within
the Exit 3 Redevelopment Project Area.
The adoption of this Redevelopment Plan does not authorize the City to issue Obligations. The issuance
of such Obligations will require City Council to enact an ordinance approving such issuance. In addition,
prior the issuance of any Obligations, the City expects to establish an "improvement district"
(containing the same property contained within the Exit 3 Redevelopment Project Area and to be
known as the "Exit 3 Municipal Improvement District") pursuant to Title 5, Chapter 37 of the Code of
Laws of South Carolina 1976, as amended.
Most Recent Equalized Assessed Valuation of the Exit 3 Redevelopment Project Area and
an Estimate of the Equalized Assessed Valuation of the Exit 3 Redevelopment Project
Area after Redevelopment
The most recent equalized assessed value of the taxable real property within the Exit 3 Redevelopment
Project Area is $19,8901 2, as shown in Exhibit A-2.
It is estimated by the Owner that upon completion of the redevelopment of the Exit 3 Redevelopment
Project Area, the equalized assessed value of the taxable real property within the Exit 3 Redevelopment
Project Area will be approximately $52,800,000 (estimated in current dollars). However, there can be no
assurance of what the equalized assessed valuation will be upon completion of such redevelopment.
1 $19,890 is the 2023 equalized assessed value according to the Jasper County Assessor property records. The most
recent reassessment was as of December 31, 2020. The next reassessment is as of December 31, 2025.
2 To be confirmed by County Auditor.
9
General Land Uses to Apply in the Exit 3 Redevelopment Project Area
New private investment in the Exit 3 Redevelopment Project Area provides the opportunity to leverage
public investment into new jobs, businesses, and residents and produce long-term increases in the real
property tax base of the City and County. The Developer and future owners will develop the property
within the Exit 3 Redevelopment Project Area in accordance with all applicable zoning (including the terms
of any applicable planned development district master plan, land use laws and that certain Second
Amendment to and Partial Restatement of Development Agreement, to be dated on or about the effective
date of the establishment of the Redevelopment Project Area, between the Owner and the City (as
amended or modified from time to time, the "Development Agreement").
Based on plans provided by the Developer, the current expectation is that the development of the Exit 3
Redevelopment Project Area will include approximately 1,520,000 square feet of general commercial
facilities; approximately 877,500 square feet of flex space; approximately 300 single family homes;
approximately 1,300 multi-family residential units; approximately 650 hotel rooms; and an RV park with
approximately 535 spaces.
Financial Impact on Taxing Districts
At present, three local taxing jurisdictions, the City, the County and the Jasper County School District (the
"School District" and together with the City and the County, the "Taxing Districts"), receive real property
tax revenues from properties located within the Redevelopment Project Area.
The redevelopment of the Redevelopment Project Area is intended to attract new investment that will
generate an enhanced tax base for the Taxing Districts.
After adoption of this Redevelopment Plan, the Taxing Districts will continue to receive property taxes
from real properties in the Exit 3 Redevelopment Project Area. In particular, 100 percent of the collected
tax revenues on the initial equalized assessed value of the Redevelopment Area will continue to be
distributed to the Taxing District as if this Redevelopment Plan had not been adopted. Assuming no
decreases in the tax millage rates or the assessed values of the properties in the Exit 3 Redevelopment
Project Area, the Taxing Districts will not lose any existing real property tax revenue.
The real property tax revenues from the Exit 3 Redevelopment Project Area will be distributed as follows:
1.100% of the tax revenues assessed and collected on the initial equalized assessed value of the Exit
3 Redevelopment Project Area will continue to be distributed to the Taxing District as if this
Redevelopment Plan had not been adopted;
2. The collected tax revenues from the incremental assessed value of the Exit 3 Redevelopment
Project Area, derived from the School District millage, the County millage and the City millage, (the
"TIE Revenues"), will be utilized as follows:
A. As indicated above, the Pledged TIE Revenues (representing 35% of the TIE Revenues, as defined
above) will be deposited in the "special tax allocation fund" and designated for payment of debt
10
service on or required reserves with respect to the Obligations, until such time as the Obligations
have been fully retired and the Redevelopment Projects have been fully paid for;
B. 65% of the TIP Revenues shall be distributed to the applicable Taxing District during the term of
the Redevelopment Plan.
To the extent that there are excess Pledged TIP Revenues in the special tax allocation fund (following the
retirement of the Obligations and the payment of all Redevelopment Project costs), such excess funds will
be distributed to the Taxing Districts based upon the Taxing Districts then current millage rates.
Each of the Taxing Districts are expected to benefit significantly in both the short-term and the long-term
from the public investments made in the Exit 3 Redevelopment Project Area. Upon completion of the
Redevelopment Projects and the repayment of the Obligations, the Exit 3 Redevelopment Project Area
will be dissolved and all ad valorem tax revenues, including any increases as a result of all growth that has
occurred within the Exit 3 Redevelopment Project Area, will accrue to each Taxing District the same
manner tax revenues accrued prior the establishment of the Exit 3 Redevelopment Project Area.
Without the implementation of the Redevelopment Plan, the tax revenues within the Exit 3
Redevelopment Project Area would likely remain stagnant.
Displacement Impact
No business or residential displacements are expected as a result of this Redevelopment Plan.
11
? w
Ar,
h'M
I
-Ol
EXHIBIT A
?/c ■jwiai7)73.■<
f ^
0)
1
03
/c /71\ fCD\ Lvl^l0.\ 7 /O
J
BOUNDARY OF THE
REDEVELOPMENT
PROJECT AREA
l
\
I /l /
fqyr%
I
FUTURE RIVERPORT-i
PARKWAY NORTHL» - x 7! 17W .
i
\ ©71'/
^ sX
l tg
I PfhJ 17
s
5i COI £o
1!xi^x
-'■ ..A7,J
p—^wmwm \
HfJlfij!
i=5
eb REO l
-Hntercha ✓
3 , V
l-
'iJ
*'m3
l4C' 'iSE] 1 BOUNDARY OF THE
REDEVELOPMENT
PROJECT AREA
»~r>* )9
x
7.
V rP3
mrm/I /:-:•///
— FUTURE RIVERPORT
PARKWAY SOUTHo \I
Q 1
jV
xl
ii
LAM iO (PUSH
k\Q
•;> tTj
0
P ] I
, - /t ^
%,v
/lsjsBOUNDARY OF THE
REDEVELOPMENT
PROJECT AREA
I
\
k..
V
;7:_
71TOTAL AREA OF
SHADED PARCEL
= ±1,608 ACRES
— Mitfill
■©A
C :■..
"Pili nr%GRAPHIC SCALE
■X'
; Jy \v/( m mr )
1 tack - 600 ft.
\ vl7-^ ,.^x. e
HR THOMAS
H HUTTONEXIT 3
REDEVELOPMENT PROJECT AREA
HARDEEV1LLE, SOUTH CAROLINA
PREPARED FOR
50 Port ol Commer
Savannah. GA 31405 •
ce Way
912.234.5300
www.thomaiandhutton.c om
SLF III, HARDEVILLE LLC
September 2023
CO'TdGnl e Xtn THOMAS l HUIIOH
Exhibit A-l - Legal Description of the Property to be Included in the Exit 3 Redevelopment
Project Area
ALL those certain pieces, parcels and tracts of land situate, lying and being in the City of Hardeeville,
County of Jasper, State of South Carolina, consisting in the aggregate of approximately 1608.30 acres, and
being shown and described as "PARCEL 1A" containing 200.58 acres, more or less, "PARCEL 4" containing
179.72 acres, more or less, "PARCELS" containing 31.27 acres, more or less, "PARCELS" containing 469.07
acres, more or less, "PARCEL 7" containing 163.77 acres, more or less, "PARCEL 8" containing 288.62 acres,
more or less, "PARCEL 9" containing 27.57 acres, more or less, and "PARCEL 10" containing 247.70 acres,
more or less, on a plat entitled "BOUNDARY PLAT THE HARDEEVILLE TRACT PARCEL 1A, PARCEL 4, PARCEL
5, PARCEL 6, PARCEL7, PARCELS, PARCEL9 and PARCEL 10 CITY OF HARDEEVILLE, JASPER COUNTY, SOUTH
CAROLINA" prepared for SLF III- Hardeeville, LLC, by Robert K. Morgan, III, S.C.R.L.S. No. 26957, of Thomas
& Hutton Engineering Co., Savannah, GA, dated September 23, 2020, and recorded November 4, 2020, in
the Office of the Jasper County Register of Deeds in Plat Book 0037 at Pages 0269-0272, bearing Document
No. 202000005316, reference to which is hereby craved for a more complete description.
BEING a portion of that real property conveyed to SLF lll-HARDEEVILLE, LLC, a Texas limited liability
company, by that certain limited warranty deed from JPR LAND CO., LLC, a South Carolina limited liability
company, recorded in the Office of the Jasper County Register of Deeds in Book 645 at Page 96.
TMS No. 029-00-03-006 (Parcel 1A)
TMS No. 030-00-02-009 (Parcel 4)
TMS No. 030-00-02-015 (Parcel 5)
TMS No. 030-00-01-014 (Parcel 6)
TMS No. 030-00-01-015 (Parcel 7)
TMS No. 030-00-01-001 (Parcel 8)
TMS No. 030-00-01-017 (Parcel 9)
TMS No. 030-00-01-018 (Parcel 10)
Exhibit A-2 - Parcels within the Exit 3 Redevelopment Project Area
Real Property Parcels within the Exit 3 Redevelopment Project Area
Taxable Assessment
Value
Total
Ratio Assessment TIP AcresParcel TMS No. Land Improvement TotalOwner Name Acreage
$ 756,700 $ $ 756,700 $ 37,3001A 029-00-03-006 SLF III Hardeeville, LLC
4 030-00-02-009 SLF III Hardeeville, LLC
5 030-00-02-015 SLF III Hardeeville, LLC
6 030-00-01-014 SLF III Hardeeville, LLC
7 030-00-01-015 SLF III Hardeeville, LLC
8 030-00-01-001 SLF III Hardeeville, LLC
9 030-00-01-017 SLF III Hardeeville, LLC
10 030-00-01-018 SLF III Hardeeville, LLC
200.58 6.0% 2,240 200.58
179.72 683,000 683,000 33,500 6.0% 2,020 179.72
31.27 59,300 59,300 6.0%4,100 250 31.27
469.07 1,343,400 1,343,400 116,200 6.0% 6,970 469.07
163.77 562,800 562,800 29,200 6.0% 1,750 163.77
288.62 1,056,400 1,056,400 54,900 6.0% 3,290 288.62
27.57 173,500 173,500 5,600 6.0% 340 27.57
247.70 1,042,500 1,042,500 50,500 6.0% 3,030 247.70
1,608.30 $5,677,600 $ - $ 5,677,600 $ 331,300 $ 19,890 1,608.30
Note: The Jasper County Assessor has classified the parcels are Class Code 354, "Rural Agriculture."
Source: Tax parcel summaries as reflected at Jasper County, SC Assessor aPublic.net on September 26,
2023 (2023 values).
The last reassessment was as of December 31, 2020. The next reassessment will be as of December 31,
2025.
2
Exhibit B. Schedule of Estimated Costs of Redevelopment Projects
Redevelopment Projects:
Exit 3 Proper
Plans & Engineering Exit 3 Proper Project
Land (estimated value)
Construction Exit 3 Proper Project
Exit 3 Proper Project total
Estimated Costs:
$3,400,000
$1,008,000
$45.604.000 See Exhibit B-l
$50,012,000
Parkway North Project
$1,200,000
$13.936.000 See Exhibit B-2
$15,136,000
Land (estimated value)
Construction Parkway North Project
Parkway North Project total
Parkway South Project
$1,819,049 See Exhibit B-3
$1,476,000
$27.285,737 See Exhibit B-3
$30,580,786
Design and Engineering Parkway South
Land (estimated value)
Construction Parkway South Project
Parkway South Project total
Costs relating to multiple Redevelopment
Projects $4,164,587
$99,893,373Total Estimated Costs
;
Exhibit B-l: Exit 3 Proper Project
See the cost estimate from Stantec on the following page.
;
!
!
!
Stantec Consulting Services Inc.
4969 Centre Pointe Drive Suite 200
North Charleston SC 29418-6952
Tel: (843) 740-7700
Stantec
Interchange Improvements of 1-95 Exit 3 Concept
(Limits per map from Craig Winn of SCOOT on March 9, 2021)
Engineer's Opinion of Probable Construction Cost
5/31/2023
SECTION ITEM QUANTITY UNIT UNIT PRICE NET PRICE
1031000 MOBILIZATION 1.000 LS $2,000,000.00 $2,000,000.00
1032010 BONDS AND INSURANCE
CONSTRUCTION STAKES, LINES & GRADES
1.000 LS $400,000.00 $400,000.00
1050800 1.000 $150,000,00EA $150,000.00
1071000 TRAFFIC CONTROL $1,500,000.001.000 LS $1,500,000.00
1080300 CRM PROGRESS SCHEDULE 1.000 LS $20,000,00 $20,000,00
1090200 AS-BUILT CONSTRUCTION PLANS $30,000.001.000 LS $30,000.00
2011000 CLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 $500,000.00LS $500,000.00
2025000 REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 10,600.000 SY $10.00 $106,000,00
2031000 UNCLASSIFIED EXCAVATION 1 6,800.000 CY $20.00 $336,000.00
2033000 BORROW EXCAVATION 686,500.000 CY $20.00 $13,730,000.00
2034000 MUCK EXCAVATION 7,200.000 CY $25.00 $180,000.00
3011080 CEMENT MODIFIED SUBBASE (8" UNIFORM) 0.000 SY $5.00 $0.00
3050104 GRADED AGGREGATE BASE COURSE (4" UNIFORM) 10,700.000 SY $15.00 $160,500,00
3069900 MAINTENANCE STONE 1,000.000 TON $60.00 $60,000.00
3081090 CEMENT STAB, AGGR. BASE CR. (9" UNIF.) 27,500.000 $25.00SY $687,500,00
3100310 HOT MIX ASPHALT BASE COURSE - TYPE A 6,000.000 TON $80.00 $480,000.00
4010005 PRIME COAT 648.000 GAL $5.00 $3,240.00
4011004 LIQUID ASPHALT BINDER PG64-22 590.000 TON $800,00 $472,000.00
4011008 LIQUID ASPHALT BINDER PG76-22 135.000 TON $100.00 $13,500.00
4013100 MILLING EXISTING ASPHALT PAVEMENT 1.0" 0.000 SY $6,00 $0,00
4020310 HOT MIX ASPHALT INTERMEDIATE COURSE TYPE A 4,500.000 TON $80.00 $360,000.00
4030310 HOT MIX ASPHALT SURFACE COURSE TYPE A 2,700.000 TON $80,00 $216,000.00
4030320 HOT MIX ASPHALT SURFACE COURSE TYPE B 1,800.000 TON $80.00 $144,000,00
4030350 HOT MIX ASPHALT SURFACE COURSE TYPE D 300.000 TON $80.00 $24,000.00
6520200 EXTRUDED PANEL SIGNS - GROUND MOUNTED EXTRUDED 315.000 SF $50.00 $15,750,00
OVERHEAD SIGN STRUCTURE NO.(BRIDGE STRUCTURES)6573100 $120,000.0012.000 EA $1,440,000.00
6573100 OVERHEAD SIGN STRUCTURE NO.(CANTILEVER STRUCTURES) 18.000 $100,000.00EA $1,800,000.00
7203210 CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 4,499.000 $50.00LF $224,950.00
7206000 CONCRETE MEDIAN 4,100.000 $120,00SY $492,000,00
8058152 CONCRETE BARRIER WALL (TYPE-11 B) 4' MAX.DIFF.IN RDWY.ELEV. 487.000 $400.00 $194,800.00LF
DEWATERING 1.000 LS $120,000.00 $120,000,00
DRAINAGE PIPE 2,660.000 $120,00LF $319,200.00
DRAINAGE STRUCTURES $6,000.0023.000 EA $138,000,00
PAVEMENT MARKINGS AND SIGNING 1.000 $75,000,00LS $75,000.00
TRAFFIC SIGNALS $175,000.003.000 EA $525,000.00
EROSION CONTROL 1.000 $1,750,000,00 $1,750,000,00LS
BRIDGE DEMOLITION (1-95 OVERPASS) 1.000 LS $100,000,00 $100,000,00
BRIDGE CONSTRUCTION (INTERCHANGE OVERPASS) 45,730.000 SF $200.00 $9,146,000.00
$37,913,440.00
$0.00
$100,000.00
$0.00
$3,040,000.00
$4,550,000.00
SUBTOTAL =
RIGHT-OF-WAY =
UTILITY RELOCATIONS =
WETLAND DELINEATION, PERMITTING & MITIGATION =
CONSTRUCTION ENGINEERING AND INSPECTION (8%) =
________________________CONTINGENCIES (12%) =
TOTAL PROJECT COST = $45,604,000.00
NOTES:
1. THIS COST ESTIMATE COVERS RIVERPORT PARKWAY FROM STATION 150+00 TO STATION 174+28.
2. TRAFFIC CONTROL PRICE ASSUMES PURRYSBURG ROAD CAN BE CLOSED FOR BRIDGE REMOVAL AND CONSTRUCTION.
3. CEI HAS BEEN REDUCED FROM THE TYPICAL 15% TO 8% DUE TO THE OVERLAP WITH THE 1-95 WIDENING PROJECT.
4. PRICES WERE DETERMINED FROM AN EVALUATION OF BID EXPRESS VALUES FROM 2023.
5. SURVEYING AND ENGINEERING FEES WILL BE HANDLED SEPARATELY.
6. 1-95 EXIT 3 INTERCHANGE ACCELERATION AND DECELERATION LANES TO BE BUILT BY SCDOT WITH THE 1-95 WIDENING PROJECT.
Exhibit B-2: Riverport Parkway North
See the cost estimate from Stantec on the following page.
Riverport Parkway North
Concept Plan ■ Four Lane Divided Roadway Transition to Two Lanes
Engineer's Opinion of Probable Construction Cost
5/31/2023
UNIT IMMIlW•
-tOBIUZATION $700,000.001.000 LS
ONDS AND INSURANCE $140,000.001.000 LS
lONSTRUCTION STAKES, LINES & GRADES $40,000,001.000 EA
RAFFIC CONTROL $20,000.001.000 LS
:pm progress schedule $15,000.001.000 LS
.S-BUILT CONSTRUCTION PLANS $20,000,001.000 LS
lEARING & GRUBBING WITHIN RIGHT OF WAY $40,000.001.000 LS
NCLASSIFIED EXCAVATION $25.009,300 CY
ORROW EXCAVATION $25.00166,900.000 CY
4UCK EXCAVATION $25.005,400.000 CY
MAINTENANCE STONE $80.00200.000 TON
IOT MIX ASPHALT BASE COURSE - TYPE A $80.0010,700.000 TON
IQUID ASPHALT BINDER PG64-22 $800.00905.000 TON
$100.00MILLING EXISTING ASPHALT PAVEMENT 2.0" 100.000 SY
IOT MIX ASPHALT INTERMEDIATE COURSE TYPE A $80.003,760.000 TON
IOT MIX ASPHALT SURFACE COURSE TYPE B $80.003,760.000 TON
$150,000.00lEWATERING 1.000 LS
$120.00IRAINAGE PIPE 200.000 LF
$150,000.00OX CULVERT 1.000 EA
$50,000.00AVEMENT MARKINGS AND SIGNING 1.000 LS
$600,000.00ROSION CONTROL 1.000 LS
$40,000.00RIDGE DEMOLITION (PURRYSBURG ROAD OVER CSX RR) 1.000 LS
RIDGE CONSTRUCTION (RIVERPORT PARKWAY OVER CREEK) $200.006,923.000 SF
RIDGE CONSTRUCTION (RIVERPORT PARKWAY RAILROAD OVERPASS) $200.0010,920.000 SF
SUBTOTAL =
RIGHT-OF-WAY =
UTILITY RELOCATIONS =
WETLAND DELINEATION, PERMITTING & MITIGATION =
CONSTRUCTION ENGINEERING AND INSPECTION =
________________________CONTINGENCIES (12%) =
TOTAL PROJECT COST =
MATE COVERS RIVERPORT PARKWAY FROM STATION 45+50 TO STATION 150+00.
)N ENGINEERING AND INSPECTION WILL BE HANDLED SEPARATELY.
DETERMINED FROM AN EVALUATION OF BID EXPRESS VALUES FROM 2023.
4D ENGINEERING FEES WILL BE HANDLED SEPARATELY.
Exhibit B-3: Riverport Parkway South
See the cost estimate from Thomas and Hutton on the following two pages. i
RIVERPORT PARKWAY SOUTH (purrysburg ROAD - SOUTH OF 1-95) 4 LANE DIVIDED ROADWAY
HARDEEVILLE, SC
THOMAS & HUTTON ENGINEERING CO.
DATE : 10/25/07
REVISED: 06/26/23
BY: JLM/SSF
JOB : 20995 / 24863
EARTHWORK, PAVING, GRADING AND DRAINAGE- FOR IMPROVEMENTS TO RIVERPORT PARKWAY SOUTH - 2 INITIAL LANES
ITEM DESCRIPTION QUANTITY UNITS UNIT PRICE TOTAL
1 MOBILIZATION 1 LS 1 40,500.00 1. 40,500.00
2 CLEARING FOR 150' RAW AC i.45.50 8,000.00 3L 364,000.00
3 BASE COURSE (10 IN. ) 61,711 SY 1 18.00 1 1,110,798,00
BINDER SURFACE (2.25 IN.)4 61,711 SY $ 14.00 $ 863,954,00
5 WEARING SURFACE (1.75 IN.) 61,711 SY $ 11.00 $ 678,821,00
PRIME COAT6 61,711 SY $ 1.00 $ 61,711.00
TACK COAT7 61,711 SY $ 1.00 $ 61,711.00
8
4" CONDUIT9 1250 LF $ 8.00 $ 10,000.00
10 61'CONDUIT 1250 LF $ $12.00 15,000.00
11 EROSION CONTROL 1 LS 1 300,000,00 1 300,000,00
ROADWAY GRADING12 SY213,311 1 7.00 1 1,493,177.00
GRASSING13 SY151,600 1 0,70 1 106,120,00
14 REMOVE UNSUITABLE (MUCK) CY71,104 i. 15.00 1 1,066.560,00
15 SELECT FILL FOR ROAD CY142,208 $ 25.00 $ 3,555,200.00
STORM DRAINAGE16 JOB LS ! 2,000,000.00 i. 2,000,000.00
SANITARY SEWER17 JOB LS $ 660,000,00 $ 660,000.00
WATER18 JOB LS $ 330,000,00 $ 330,000,00
OUTFALL LAGOON/DITCHING19 LS1 $ 750,000.00 $ 750,000,00
6" SGD ( PERFORATED W/ STONE AND
FILTER FABRIC)____________________20 20,508 LF $ 20.00 $ 410,160.00
STONE BACKFILL21 280 CY $ 40.00 $ 11,200.00
SAND BACKFILL22 50 CY $ 10.00 $ 500.00
TRAFFIC CONTROL23 1 LS $ 704,000.00 $ 704,000,00
4" WHITE SOLID LINE THERMOPLASTIC24 19198 LF $ $0.60 11,518,80
4" YELLOW SOLID LINE THERMOPLASTIC25 19198 LF $ $0.60 11,518,80
24'' WHITE SOLID LINE 125 MIL26 160 LF $ $6.50 1,040.00
WHITE SINGLE ARROWS TYPE 227 EA12 $ 75.00 $ 900.00
28 YELOW PAVEMENT MARKERS BI-DIR. 240 EA $ 6.50 $ 1,560,00
PERMANENT SIGNING29 1 LS $ $5,000,00 5,000,00
SUB-TOTAL EARTHWORK, PAVING, GRADING AND DRAINAGE $ 14,624,949,60
5% CONTINGENCY $ 731,247.48
7% ENGINEERNG, PLANNING, PERMITTING, LEGAL AND SURVEYING $ 1,023,746.47
TOTAL: RIVERPORT PARKWAY SOUTH ^urrysburg road-south ofi-95) (2 INITIAL LANES) 16,379,943.55
COST PER MILE $ 4,504,953.74
COST PER LINEAR FOOT $ 853.21
OPINIONS OF PROBABLE COST
Since the engineer has no control over the cost of labor, materials, equipment, the Contractor's
methods of determining prices, or over competitive bidding or market conditions, his Opinions of Probable
Construction Costs provided herein are to be made on the basis of his experience and qualifications.
These opinions represent his best judgment as a design professional familiar with the construction
industry.
* THIS ESTIMATE IS BASED UPON A CONCEPTUAL ROUTING FOR RIVERPORT PARKWAY SOUTH. NO DESIGN INFORMATION IS AVAILABLE AT THIS TIME.
PAGE 1 OF 2
Z:\24863\24863.0000\Engineering\Calculations\Quantity Take OfftCopy of Exit 3-RiverPort Parkway - SIB Improvements Opinion of Cost UPDATED VERSION 6-26-2023.xlsx
RIVERPORT PARKWAY SOUTH (PURRYSBURG ROAD SOUTH OF 1-95)4 LANE DIVIDED ROADWAY
HARDEEVILLE, SC
THOMAS & HUTTON ENGINEERING CO.
DATE : 10/25/07
REVISED: 06/26/23
BY: JLM/SSF
JOB : 20995 / 24863
EARTHWORK, PAVING, GRADING AND DRAINAGE- FOR IMPROVEMENTS TO RIVERPORT PARKWAY SOUTH - ADDITIONAL 2 LANES
ITEM DESCRIPTION QUANTITY UNITS UNIT PRICE TOTAL
1 MOBILIZATION LS1 1 140,500,00 40,500.00
2 BASE COURSE (10 IN, ) 61,711 SY 1 28.00 1 1,727,908.00
3 BINDER SURFACE (2,25 IN.)
WEARING SURFACE (1.75 IN.)
SY61,711 $ 14.00 $ 863,954.00
4 61,711 SY $ 11.00 $ 678,821.00
PRIME COAT5 61,711 SY $ $1.00 61,711.00
TACK COAT6 SY61,711 $ 1.00 $ 61,711.00
7
8 4" CONDUIT LF1250 $ 8.00 $ 10,000.00
6" CONDUIT9 1250 LF $ $12.00 15,000,00
10 EROSION CONTROL LS1 1 350,000.00 1 350,000,00
ROADWAY GRADING11 106,656 SY 1 17.00 746,592.00
GRASSING12 SY44,945 1 0.70 $ 31.461,50
13 REMOVE UNSUITABLE (MUCK) 36,974 CY $ 115,00 554,610.00
14 SELECT FILL FOR ROAD CY73,948 1 25,00 $ 1,848.700,00
15 STORM DRAINAGE JOB LS 1 12,000,000.00 2,000,000,00
16 SANITARY SEWER JOB LS $ $660,000.00 660,000.00
17 WATER JOB LS $ 330,000.00 $ 330,000.00
OUTFALL LAGOONS/DITCHING48 LS1 $ 250,000.00 $ 250,000.00
6" SGD ( PERFORATED W/ STONE AND
FILTER FABRIC)____________________49 20,508 LF $ 20.00 $ 410,160,00
STONE BACKFILL20 280 CY $ 40.00 $ 11,200,00
SAND BACKFILL21 560 CY $ $10.00 5,600,00
TRAFFIC CONTROL22 LS1 $ 672,000.00 $ 672,000,00
4" WHITE SOLID LINE THERMOPLASTIC23 19198 LF $ $0.60 11,518.80
4" YELLOW SOLID LINE THERMOPLASTIC24 19198 LF $ $0.60 11,518,80
24" WHITE SOLID LINE 125 MIL25 160 LF $ 6.50 $ 1,040,00
WHITE SINGLE ARROWS TYPE 226 12 EA $ $75.00 900.00
27 YELOW PAVEMENT MARKERS BI-DIR. 240 EA $ 6.50 $ 1,560,00
PERMANENT SIGNING28 LS1 $ 5,000.00 $ 5,000.00
SUB-TOTAL EARTHWORK, PAVING, GRADING AND DRAINAGE $ 11,361,466.10
5% CONTINGENCY $ 568,073.31
7% ENGINEERNG, PLANNING, PERMITTING, LEGAL AND SURVEYING $ 795,302.63
TOTAL: PURRYSBURG ROAD SOUTH OF I-95 (ADDITIONAL 2 LANES; 12,724,842,04
COST PER MILE 1 3,499,696.11
COST PER LINEAR FOOT $ 662.82
OPINIONS OF PROBABLE COST
Since the engineer has no control over the cost of labor, materials, equipment, the Contractor’s
methods of determining prices, or over competitive bidding or market conditions, his Opinions of Probable
Construction Costs provided herein are to be made on the basis of his experience and qualifications.
These opinions represent his best judgment as a design professional familiar with the construction
industry.
* THIS ESTIMATE IS BASED UPON A CONCEPTUAL ROUTING FOR PURRYSBURG ROAD. NO DESIGN INFORMATION IS AVAILABLE AT THIS TIME.
PAGE 2 OF 2
Z:\24863\24863.0000\Engineering\Calculations\Quantity Take OfACopy of Exit 3-RiverPort Parkway - SIB Improvements Opinion of Cost UPDATED VERSION 6-26-2023.xlsx
PPAB 10067145v2 7
EXHIBIT D
IMPROVEMENT PLAN
Exit 3 Municipal Improvement District
City of Hardeeville, South Carolina
Improvement Plan
September 28,2023
Introduction
Pursuant to the Municipal Improvements Act of 1999, codified as Title 5, Chapter 37 of the Code
of Laws of South Carolina 1976, as amended (the “Act”), the City of Hardeeville, South Carolina
(the “City”) is authorized to designate an area within the City as an improvement district, in which
the City may undertake public improvements in order to preserve property values, prevent
deterioration of urban areas, and preserve the tax base of the municipality. The Act provides that
the costs of such improvements may be defrayed by the imposition of special assessments within
the improvement district and the issuance of bonds, and other borrowings.
This Improvement Plan is written to meet the requirements of an “improvement plan” (as defined
in the Act) for the establishment of the Exit 3 Municipal Improvement District (the “Improvement
District”). A map of the Improvement District is shown in Exhibit A attached hereto. The City,
by separate action in accordance with the Act, will establish an Assessment Roll, including a Rate
and Method of Apportionment of Assessment, which will specify the special assessments to be
levied against real property within the Improvement District.
Through the execution of this Improvement Plan, the City intends to provide a benefit to the real
property within the Improvement District, to increase property values within the Improvement
District, to encourage and promote private and public development within the Improvement
District and to improve the tax base of the City.
The adoption of this Improvement Plan does not authorize the City to issue bonds or incur
other debt secured in whole or in part by special assessments levied against real property
within the Improvement District. The issuance of bonds or the incurrence of other debt
secured in whole or in part by special assessments levied against real property within the
Improvement District will require City Council of the City (the “City Council”) to enact an
ordinance approving such issuance or incurrence.
Description of the Improvement District
The specific parcels of real property included within the Improvement District are specified in the
following table.
2\P a g e
Table A
Real Property Parcels within the Improvement District
Parcel Owner Acres
029-00-03-006
030-00-01-001
030-00-01-014
030-00-01-015
030-00-02-009
030-00-02-015
030-00-01-017
030-00-01-018
Total
SLF III Hardeeville, LLC
SLF III Hardeeville, LLC
SLF III Hardeeville, LLC
SLF III Hardeeville, LLC
SLF III Hardeeville, LLC
SLF III Hardeeville, LLC
SLF III Hardeeville, LLC
SLF III Hardeeville, LLC
200.58
288.62
469.07
163.77
179.72
31.27
27.57
247.70 ;
1,608.30
The real property included within the Improvement District is located in the City, surrounds 1-95
and is south of Exit 5 of 1-95. The real property in the Improvement District comprises
approximately 5.6 percent of the total acreage of the City.
All real property within the Improvement District will be subject to the Development Agreement
(as such term is defined below) between the City and SLF III-Hardeeville, LLC (together with its
successors and assigns as Owner (as such term is defined in the Development Agreement, the
“Owner”) and is currently owned by the Owner. The Owner has indicated that it will submit a
signed petition to the City, prior to the City’s full creation of the Improvement District by
ordinance, to request the real property parcels specified in the table above be included in the
Improvement District. It is expected that either the Owner or its successors and assigns (in such
capacity, the “Developer”) will develop the real property within the Improvement District.
Proposed Land Uses
New private investment in the Improvement District provides the opportunity to leverage public
investment in the Improvement District into new jobs, businesses and residents and thus produce
long-term increases in the City’s tax base. The City anticipates and will require the Owner and
future Developers to develop the property within the Improvement District in accordance with all
applicable zoning and land use laws.
Plans provided by the Owner specify the Owner’s current expectation that the development of the
real property within the Improvement District will include approximately 1,520,000 square feet of
general commercial facilities; approximately 877,500 square feet of flex space; approximately 300
single family homes; approximately 1,300 multi-family residential units; approximately 650 hotel
rooms; and an RV park with approximately 535 spaces.
The proposed land uses will be permitted by that certain Second Amendment to and Partial
Restatement of Development Agreement to be dated on or about the effective date of the
3\P a g e
establishment of the Improvement District between the Owner and the City (as amended or
modified from time to time, the “Development Agreement”).
Governmental Approvals and Regulatory Agency Permits
The implementation of this Improvement Plan will require compliance with applicable zoning and
land use regulations and completion of City review and application processes. Construction of the
Improvements (as defined below) will require various approval and/or permits, including ones
from the City and from agencies and departments of the State of South Carolina and the United
State of America. This Improvement Plan will have no impact on the applicable zoning and land
use regulations or City review and application processes.
i
Description and Estimated Costs of the Improvements
The purpose of this Improvement Plan, the Improvement District, the Assessments (as defined
below) to be levied in the Improvement District and the anticipated borrowing(s) with respect to
the Improvement District are to assist in the provision of the following public improvements
(collectively, the “Improvements”):
1. a new interchange at Exit 3 on 1-95, including all related drainage and storm water and
infrastructure (the “Exit #3 Proper Project”);
2. an approximately 1.5-mile stretch of RiverPort Parkway north of 1-95, including all related
drainage and storm water infrastructure (the “Parkway North Project”); and
3. an approximately 4-mile stretch of RiverPort Parkway south of 1-95, including all related
drainage and storm water infrastructure (the “Parkway South Project”).
Each of the Improvements is intended to constitute an “Improvement” as such term is defined in
the Act. All such Improvements (subject to the approval or acceptance by the public entity which
takes ownership of the Improvement, as applicable) shall be deemed authorized by this
Improvement Plan. No portion of the proceeds of the SCTIB Grant (defined below) or SCTIB
Loan (defined below) shall be used to fund the Parkway South Project or to make payment for the
right of way necessary for the Improvements.!
It is expected by the City that the Owner will be responsible for, or will assist with, the design,
permitting and approvals of each of the Improvements. It is further expected by the City that (1)
the South Carolina Department of Transportation (“SCDOT”) will be responsible for the
construction of Exit #3 Proper Project; (2) the City will be responsible for the construction of the
Parkway North Project, and (3) the Owner will be responsible for the construction of the Parkway
South Project. Each of the Improvements will be located in the City and will be located in, adjacent
to or in close proximity of the Improvement District. It is expected by the City that the Exit #3
Proper Project will be owned and maintained by the SCDOT and that both the Parkway North
■ Project and the Parkway South Project will be owned and maintained by the City. The City
Council, after due investigation and study, has determined that the portions of the proposed
Parkway North Project and Parkway South Project that are expected to be located outside the
boundaries of the Improvement District confer a benefit upon property inside the Improvement
4\P a g e
District or are necessary to make the Improvements within the Improvement District effective for
the benefit of property inside the Improvement District. The City anticipates acquiring the real
property within the Improvement District on which the proposed Parkway South Project and
Parkway North Project are expected to be built, through the execution of this Improvement Plan.
As of the date of this Improvement Plan, the only Improvements that have been constructed are a
portion of the Parkway South Project, consisting of approximately 2,500 linear feet of four lane
divided roadway with drainage, water, wastewater, and electric service lines; this portion of the
Parkway South Project is not located within the Improvement District, was constructed by private
parties in 2018 and 2019 and will not be paid for directly or indirectly by the Assessments (as
defined below).
The total estimated costs of the Improvements, inclusive of the estimated value of the real property
to be contributed by the Owner, provided to the City by the Owner in certain cases, are $99,893,373
as shown in the table below and further detailed on Exhibit B attached hereto.
Table B
Estimated Costs of the Improvements
Improvement Estimated Cost
Exit 3 Proper Project
Parkway North Project
Parkway South Project
Costs for multiple Improvements
Total
$50,012,000
$15,136,000
$30,580,786
$4,167,587
$99,893,373
The estimates specified in the table above were prepared in 2023; actual costs may vary. The
estimated costs do not limit the amount that may be spent on the Improvements. The estimated
cost of the Parkway South Project does not include costs relating to the portion of the Parkway
South Project already constructed.
The objectives of the City with respect to the Improvement District and the Improvements are
summarized as follows:
1. To preserve and enhance the economy, property values and tax base of the City and
encourage and promote private and public development within the Improvement District;
2. To create new jobs and enhance the economic health of the community through
diversification of the economic base;
3. To create connectivity and improve transportation between the Improvement District, the
Port of Savannah, the future Jasper Ocean Terminal and surrounding economic
development projects;
4. To enhance mobility and safety by providing alternative and more secure evacuation routes
within the Improvement District and surrounding areas; and
5\P a g e
!
i
5. To avoid major traffic disruptions within the Improvement District and surrounding areas
in light of the projected insufficiency of Exit 5 of 1-95 to accommodate anticipated traffic.
The Improvements are necessary to accomplish the objectives of the Improvement District. It is
anticipated that following the completion of the Improvements, a combination of private
investment and public investments will achieve these objectives.
Time Schedule for the Accomplishment of the Improvement Plan
The projected time schedule for the accomplishment of the Improvement Plan is approximately
five years.
1
Bidding Process
It is anticipated that the contract for the construction of (a) the Exit #3 Proper Project will be
publicly bid by the South Carolina Department of Transportation and (b) the Parkway North
Project will be publicly bid by the City. It is further anticipated that the contract for the construction
of the Parkway South Project will be privately bid by the Owner; provided, such contract may be
publicly bid at the request of the Owner.
Overview of Source of Funds
It is anticipated by the City and Owner that funds required to construct the Improvements will be
obtained through a combination of a grant made by South Carolina Transportation Infrastructure
Bank (the “SCTIB”) to the City and Jasper County, South Carolina (the “County”); a loan(s)
made by the SCTIB to the City and the County (the “SCTIB Loan”); other borrowings by the City
that are (1) secured by the Assessments (defined below) and (2) expressly approved by the Owner
(the “Other Assessment Borrowings”; such Other Assessment Borrowings, together with the
SCTIB Loan being referred to herein as “Assessment Debt”); contributions made by the County;
and private investments and contributions by the Owner. The following table provides the expected
sources and uses of funds.
6\P a g e
Table C
Expected Sources and Uses of Funds
Sources of Funds or Contribution Uses of Funds or Contribution
Estimated
Amount or
Estimated
Value Uses
Estimated
Cost or
Estimated
ValueSources
Cash or Similar Contributions:
SCTIB Grant*
SCTIB Loan**
Jasper County Cash Contribution
City Contribution***
Owner Cash Contribution
Owner’s Payment for Parkway South
Total Cash or Similar Contributions
Improvements:
$28,100,000 Exit 3 Proper
$3,400,000
$1,008,000
$45.604.000
$ 18,240,000 Plans & Engineering Exit 3 Proper Project
$ 13,500,000 Land (estimated value)
$4,164,587 Construction Exit 3 Proper Project
$3,100,000 Exit 3 Proper Project total
$29,104,786 Parkway North Project
$96,209,373 Land (estimated value)
Construction Parkway North Project
Parkway North Project total
$50,012,000
$1,200,000
$13.936.000
$15,136,000Other:
Owner Contribution of Land for Public
ROW****
$3,684,000 Parkway South Project
Design and Engineering Parkway South
Land (estimated value)
Construction Parkway South Project
Parkway South Project total
$1,819,049
$1,476,000
$27.285.737
$30,580,786
Costs relating to multiple
Improvements* * * * * $4,164,587
$99,893,373 $99,893,373Total Sources of Funds or Contributions
*No portion of the proceeds of the SCTIB Grant or SCTIB Loan shall be used to fund the Parkway South Project or
for payment for the public right of way.
Total Uses of Funds or Contributions
**An additional up to $9,860,000 in SCTIB Loan proceeds are available to pay for costs of the Exit #3 Proper Project
to the extent that the total cost of the Exit #3 Proper Project (excluding the land contribution) is greater than the
estimated amount specified in the table above, subject to the satisfaction of certain conditions.
***The City entered into a memorandum of understanding with Owner in October 2018 (which has been amended
from time to time) for the reimbursement of certain City expenditures related to the Exit 3 Proper Project and the
design and engineering for the Parkway North Project. To date, the City has been reimbursed a total of $751,090 for
certain payments that the City has made.
* * * *The estimated value of the land to be contributed for the public right of way represents the value of the contributed
real property expected to be specified in an amendment to a Development Agreement by and between the City and
SLF III-Hardeeville, LLC.
* * * * *The City has entered into an agreement with Stantec, an engineering firm, to provide services relating to multiple
Improvements. The City has estimated that the total cost of these services from Stantec, a portion of which have been
completed, will equal the amount shown.
7 \ P a g e
Based on information provided by the Owner, the City estimates that the amount of the costs of
the Improvements to be derived from the Assessments, Assessment Bonds or other general funds
is $18,240,000, subject to increases based on cost overruns.
It is anticipated that the SCTIB Loan will be secured, in part, by and be payable from the following
and in the following order of priority: (1) first, 35% of the incremental tax revenues generated
within the Exit 3 Redevelopment Project Area (as described below), which shall be deposited into
a “special tax allocation fund,” as calculated pursuant to a “redevelopment plan,” expected to be
enacted by ordinance by the City (the “TIF Revenues Available for Debt Service”), (2) second,
funds on deposit in a debt service reserve fund (the “Debt Service Reserve Fund”) to be
established in connection with the closing of the SCTIB Loan in the expected, initial amount equal
to the maximum annual debt service under the SCTIB Loan, and (3) third, fee revenue resulting
from the collection of special assessments to be levied by the City on the real property in the
Improvement District (the “Assessments”).
Prior to the issuance of any Assessment Debt, the City expects to establish a “redevelopment
project area” (containing the same property contained within the Improvement District and to be
known as the “Exit 3 Redevelopment Project Area”) pursuant to Title 31, Chapter 6 of the Code
of Laws of South Carolina 1976, as amended. The City anticipates that the SCTIB Loan shall be
incurred under the authority of Title 31, Chapter 6 of the Code of Laws of South Carolina 1976,
as amended.
The City will use its commercially reasonable efforts to implement the proposed Assessment Debt.
The adoption of this Improvement Plan does not authorize the City to incur the Assessment
Debt. The issuance of such Assessment Debt will require the City Council to enact an
ordinance approving such issuance.
!
Proposed Basis and Rates of the Assessments to be Imposed
The Improvements can be expected to advance development of the real property within the
Improvement District and will thereby create special benefits for the real property within the
Improvement District. Assessments shall be imposed upon real property in the Improvement
District in accordance with a Report on the Reasonable Basis of the Assessment, an Assessment
Roll and a Rate and Method of Apportionment of Assessment, as well as related City ordinances,
to the extent that such documents are approved by the City Council (collectively, the “Additional
Assessment Documents”) to be developed by the City and its consultants, which shall establish
assessment rates fairly reflecting the benefits derived from the Improvements by each parcel within
the Improvement District.
An Assessment shall not be imposed upon the Improvements or any real property within the
Improvement District that does not receive a special benefit from the Improvements. Assessments
will not be imposed on real property within the Improvement District that are owned by the City,
8\P a g e
the County or other public entity. Assessments will not be imposed upon any real property located
outside of the Improvement District.
The currently expected proposed basis of the Assessments is each parcel’s distinct development
classification. Accordingly, the methodology and procedure for allocating Assessments (to be
specified in the Additional Assessment Documents), both for the initial levy to existing parcels
and for new parcels resulting from subdivisions, shall provide that the development classification
of the subdivided real property, resulting from the expected development use of the parcel, as well
as the quantity of the expected development use, shall be utilized to allocate the Assessments to
the real property parcel. For all subdivisions, the sum of the Assessments on all parcels resulting
from the subdivision shall equal the total Assessments on the single parcel in question prior to the
subdivision. The basis of the Assessments shall be specified in the Additional Assessment
Documents and pursuant to the Act may change upon the subdivisions and transfer of the real
property and/or other events that the City Council considers appropriate.
The total amount of the Assessments to be imposed are expected to equal the maximum amount
of Assessment Debt, plus the estimated interest on the Assessment Debt, and the administrative
expenses of the Improvement District. The City may establish a distinct component of the special
assessment to fund administrative expenses.
The Additional Assessment Documents shall establish rates of the Assessments that fairly reflect
the benefits derived from the Improvements by each of the individual parcels within the
Improvement District (both the currently existing parcels and parcels that may be created from the
subdivision of currently existing parcels). The Additional Assessment Documents shall establish
procedures for the City to bill and collect Assessments only as follows: (i) to fund shortfalls in the
Debt Service Reserve Requirement (to be established in documents governing the Assessment
Debt), which may result from funds having been withdrawn from the Debt Service Reserve Fund
to pay debt service on the Assessment Debt, (ii) for the final year of repayment of the Assessment
Debt, to the extent that and in the estimated amount that TIF Revenues Available for Debt Service
plus funds available in the Debt Service Reserve Fund are estimated to be insufficient to pay debt
service on the Assessment Debt as and when due, and (iii) in the amount of the estimated and
actual administrative expenses incurred and to be incurred by the City to fund the administrative
expenses of the Improvement District.
Additionally, the Additional Assessment Documents are expected to establish procedures for the
TIF Revenues Available for Debt Service resulting from a distinct parcel of real property to reduce
(potentially to zero) the amount of the Assessment that may be billed to such parcel. Additionally,
the Additional Assessment Documents are expected to establish procedures for the Assessments
to be billed by Jasper County, or the City, as appropriate.
9\P a g e
7i
lO:
"tJI
EXHIBIT A
C.c ?/ □ □Exits
V
7) Ti
7> m-<\ [a f yin
\ 5CD
' I /c
73l
f t>7G)\ [7!x3□ ,\
73 /BOUNDARY OF MUNICIPAL
IMPROVEMENT DISTRICT
a
i ^6.
I\
rti
i
\
FUTURE RIVERPORT,;
PARKWAY NORTH mL- ''
17i
fp• V\1
x<£
* m-
\ w\ ^xl s
#/>
IkF 5
t-Vj/
I a\
c^y'
<&' s'
S. o
mk Jtk 11
^V^v''
Ip
—— d? IRE
■'//.■■■
I/INTERCWAIg]
'-T-T — E, A3
!//:
BOUNDARY OF MUNICIPAL
IMPROVEMENT DISTRICT
■SSEIpi
<^1
/ /
r ' ;>
v;;:
1&, rxcESm
m \
£3 x
f "“WnSm - pV r
r
•T.
: -%
\s-:
m
A - ip*/ ///!
— FUTURE RIVERPORT
PARKWAY SOUTH
°0
\/
V I(gi
I x1
xx-'x;iw^:LAN! to (PuBLl
V
0 /O'
lispS Til
BOUNDARY OF MUNICIPAL
IMPROVEMENT DISTRICT '
6pfiy
P
,Ai
\
»
%n
■
TOTAL AREA OF
SHADED PARCEL
= ±1,608 ACRES
_P? I©\\
fW
T '
tx^xj
GRAPHIC SCALE
Id \
v/\( EX 7BT )
lock - 000 ft.
■^jiWS: /
lU THOMAS
H HUTTONEXITS
PREPARED FOR
REAL PROPERTY WITHIN THE MUNICIPAL IMPROVEMENT DISTRICT
HARDEEVILLE, SOUTH CAROLINA
50 Park ol Commer
Savannah. GA 31405 •
ce Way
912.234.5300
www.thonTatandhutton.com
SLF III, HARDEVILLE LLC
September 2023
CO'TIIGHT a XB1 tHOMAS A M
Exhibit B. Schedule of Estimated Improvements Cost
Improvements:
Exit 3 Proper
Plans & Engineering Exit 3 Proper Project
Land (estimated value)
Construction Exit 3 Proper Project
Exit 3 Proper Project total
Estimated Costs:
$3,400,000
$1,008,000
$45.604.000 See Exhibit B-l
$50,012,000
Parkway North Project
Land (estimated value)
Construction Parkway North Project
Parkway North Project total
$1,200,000
$13.936.000 See Exhibit B-2
$15,136,000
Parkway South Project
Design and Engineering Parkway South
Land (estimated value)
Construction Parkway South Project
Parkway South Project total
Costs relating to multiple Improvements
$1,819,049 See Exhibit B-3
$1,476,000
$27.285.737 See Exhibit B-3
$30,580,786
$4,164,587
Total Estimated Costs $99,893,373
Exhibit B-l: Exit 3 Proper Project
See the cost estimate from Stantec on the following page.
i
i
Stantec Consulting Services Inc.
4969 Centre Pointe Drive Suite 200
North Charleston SC 29418-6952
Tel: (843) 740-7700
Q| Stantec
Interchange Improvements of 1-95 Exit 3 Concept
(Limits per map from Craig Winn of SCDOT on March 9, 2021)
Engineer's Opinion of Probable Construction Cost
5/31/2023
SECTION ITEM QUANTITY UNIT UNIT PRICE NET PRICE
1031000 MOBILIZATION $2,000,000.001.000 LS $2,000,000,00
$400,000.00
$150,000.00
1032010 BONDS AND INSURANCE 1.000 $400,000.00LS
1050800 CONSTRUCTION STAKES, LINES & GRADES 1.000 $150,000.00EA
1071000 TRAFFIC CONTROL 1.000 LS $1,500,000,00 $1,500,000.00
$20,000.001080300 CRM PROGRESS SCHEDULE 1.000 $20,000.00LS
1090200 AS-BUILT CONSTRUCTION PLANS 1.000 LS $30,000.00 $30,000.00
2011000 CLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LS $500,000,00 $500,000,00
2025000 REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 10,600.000 SY $10.00 $106,000,00
2031000 UNCLASSIFIED EXCAVATION 16,800.000 CY $20,00 $336,000.00
2033000 BORROW EXCAVATION 686,500.000 CY $20,00 $13,730,000.00
2034000 MUCK EXCAVATION 7,200.000 CY $25.00 $180,000.00
3011080 CEMENT MODIFIED SUBBASE (8" UNIFORM) 0.000 SY $5.00 $0.00
$160,500.003050104 GRADED AGGREGATE BASE COURSE (4" UNIFORM) 10,700.000 SY $15.00
3069900 MAINTENANCE STONE 1,000.000 TON $60.00 $60,000.00
3081090 CEMENT STAB, AGGR. BASE CR. (9" UNIF.) 27,500.000 SY $25.00 $687,500.00
3100310 HOT MIX ASPHALT BASE COURSE - TYPE A 6,000.000 TON $80.00 $480,000,00
4010005 PRIME COAT 648.000 GAL $5.00 $3,240.00
4011004 LIQUID ASPHALT BINDER PG64-22 590.000 $800.00TON $472,000,00
4011008 LIQUID ASPHALT BINDER PG76-22 135.000 $100.00TON $13,500,00
4013100 MILLING EXISTING ASPHALT PAVEMENT 1.0" 0.000 SY $6.00 $0.00
4020310 HOT MIX ASPHALT INTERMEDIATE COURSE TYPE A 4,500.000 TON $80.00 $360,000.00
4030310 HOT MIX ASPHALT SURFACE COURSE TYPE A 2,700.000 TON $80.00 $216,000.00
4030320 HOT MIX ASPHALT SURFACE COURSE TYPE B 1,800.000 TON $80.00 $144,000.00
4030350 HOT MIX ASPHALT SURFACE COURSE TYPE D 300.000 TON $80.00 $24,000.00
6520200 EXTRUDED PANEL SIGNS - GROUND MOUNTED EXTRUDED 315.000 SF $50.00 $15,750.00
$1,440,000.006573100 OVERHEAD SIGN STRUCTURE NO.(BRIDGE STRUCTURES) 12.000 $120,000,00EA
6573100 OVERHEAD SIGN STRUCTURE NO.(CANTILEVER STRUCTURES) 18.000 $100,000.00EA $1,800,000,00
7203210 CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 4,499.000 LF $50.00 $224,950,00
7206000 CONCRETE MEDIAN 4,100.000 SY $120.00 $492,000.00
CONCRETE BARRIER WALL (TYPE-1 IB) 4' MAX.DIFF.IN RDWY.ELEV.8058152 487.000 LF $400.00 $194,800.00
DEWATERING 1.000 $120,000.00LS $120,000.00
DRAINAGE PIPE 2,660.000 $120.00LF $319,200.00
DRAINAGE STRUCTURES 23.000 $6,000.00 $138,000.00EA
PAVEMENT MARKINGS AND SIGNING 1.000 LS $75,000.00 $75,000.00
TRAFFIC SIGNALS 3.000 $175,000.00EA $525,000.00
EROSION CONTROL $1,750,000.001.000 LS $1,750,000.00
BRIDGE DEMOLITION (1-95 OVERPASS) 1.000 LS $100,000.00 $100,000.00
BRIDGE CONSTRUCTION (INTERCHANGE OVERPASS) 45,730.000 SF $200.00 $9,146,000.00
SUBTOTAL =
RIGHT-OF-WAY =
$37,913,440.00
$0.00
$100,000.00
$0.00
$3,040,000.00
$4,550,000,00
UTILITY RELOCATIONS =
WETLAND DELINEATION, PERMITTING & MITIGATION =
CONSTRUCTION ENGINEERING AND INSPECTION (8%) =
_______________________CONTINGENCIES (12%) =
TOTAL PROJECT COST = $45,604,000.00
NOTES:
1. THIS COST ESTIMATE COVERS RIVERPORT PARKWAY FROM STATION 150+00 TO STATION 174+28.
2. TRAFFIC CONTROL PRICE ASSUMES PURRYSBURG ROAD CAN BE CLOSED FOR BRIDGE REMOVAL AND CONSTRUCTION.
3. CEI HAS BEEN REDUCED FROM THE TYPICAL 15% TO 8% DUE TO THE OVERLAP WITH THE 1-95 WIDENING PROJECT.
4. PRICES WERE DETERMINED FROM AN EVALUATION OF BID EXPRESS VALUES FROM 2023.
5. SURVEYING AND ENGINEERING FEES WILL BE HANDLED SEPARATELY.
6.1-95 EXIT 3 INTERCHANGE ACCELERATION AND DECELERATION LANES TO BE BUILT BY SCDOT WITH THE 1-95 WIDENING PROJECT.
Exhibit B-2: Riverport Parkway North
See the cost estimate from Stantec on the following page.
i
Stantec Consulting Services Inc.
4969 Centre Pointe Drive Suite 200
North Charleston SC 29418-6952
Tel: (843) 740-7700
Stantec
Riverport Parkway North
Concept Plan - Four Lane Divided Roadway Transition to Two Lanes
Engineer's Opinion of Probable Construction Cost
5/31/2023
SECTION ITEM QUANTITY UNIT UNIT PRICE NET PRICE
1031000 MOBILIZATION_________
BONDS AND INSURANCE
$700,000.001.000 LS $700,000.00
1032010 $140,000.001.000 LS $140,000.00
1050800 CONSTRUCTION STAKES, LINES & GRADES $40,000.001.000 EA $40,000.00
1071000 TRAFFIC CONTROL 1.000 $20,000.00LS $20,000.00
1080300 CRM PROGRESS SCHEDULE $15,000,001.000 LS $15,000.00
1090200 AS-BUILT CONSTRUCTION PLANS $20,000,001.000 LS $20,000.00
2011000 CLEARING 8. GRUBBING WITHIN RIGHT OF WAY 1.000 LS $40,000.00 $40,000.00
$232,500.002031000 UNCLASSIFIED EXCAVATION 9,300 $25.00CY
2033000 BORROW EXCAVATION 166,900.000 $25.00CY $4,172,500.00
2034000 MUCK EXCAVATION 5,400.000 $25.00CY $135,000.00
3069900 MAINTENANCE STONE 200.000 TON $80.00 $16,000.00
3100310 HOT MIX ASPHALT BASE COURSE - TYPE A 10,700.000 TON $80.00 $856,000.00
4011004 LIQUID ASPHALT BINDER PG64-22 905.000 TON $800,00 $724,000.00
4013200 MILLING EXISTING ASPHALT PAVEMENT 2.0" 100.000 $100.00SY $10,000.00
4020310 HOT MIX ASPHALT INTERMEDIATE COURSE TYPE A 3,760.000 $80.00TON $300,800.00
4030320 HOT MIX ASPHALT SURFACE COURSE TYPE B 3,760.000 $80.00TON $300,800.00
DEWATERING $150,000.001.000 LS $150,000.00
DRAINAGE PIPE $120.00200.000 LF $24,000.00
BOX CULVERT $150,000.001.000 EA $150,000,00
PAVEMENT MARKINGS AND SIGNING $50,000.001.000 LS $50,000.00
EROSION CONTROL $600,000.001.000 LS $600,000.00
BRIDGE DEMOLITION (PURRYSBURG ROAD OVER CSX RR) $40,000.001.000 LS $40,000,00
BRIDGE CONSTRUCTION (RIVERPORT PARKWAY OVER CREEK) 6,923.000 SF $200.00 $1,384,600.00
BRIDGE CONSTRUCTION (RIVERPORT PARKWAY RAILROAD OVERPASS) 10,920.000 SF $200.00 $2,184,000.00
SUBTOTAL =
RIGHT-OF-WAY =
UTILITY RELOCATIONS =
WETLAND DELINEATION, PERMITTING & MITIGATION =
CONSTRUCTION ENGINEERING AND INSPECTION =
$12,305,200.00
$0.00
$150,000.00
$0.00
$0.00
CONTINGENCIES (12%) = $ 1,480,000.00
TOTAL PROJECT COST = $13,936,000.00
NOTES:
1. THIS COST ESTIMATE COVERS RIVERPORT PARKWAY FROM STATION 45+50 TO STATION 150+00.
2. CONSTRUCTION ENGINEERING AND INSPECTION WILL BE HANDLED SEPARATELY.
3. PRICES WERE DETERMINED FROM AN EVALUATION OF BID EXPRESS VALUES FROM 2023.
4. SURVEYING AND ENGINEERING FEES WILL BE HANDLED SEPARATELY.
Exhibit B-3: Riverport Parkway South
See the cost estimate from Thomas and Hutton on the following two pages.
«*■
RIVERPORT PARKWAY SOUTH (purrysburg road - south ofi-95)4 LANE DIVIDED ROADWAY
HARDEEVILLE, SC
THOMAS & HUTTON ENGINEERING CO.
DATE : 10/25/07
REVISED: 06/26/23
BY: JLM/SSF
JOB: 20995/24863
EARTHWORK, PAVING, GRADING AND DRAINAGE- FOR IMPROVEMENTS TO RIVERPORT PARKWAY SOUTH - 2 INITIAL LANES
ITEM DESCRIPTION QUANTITY UNITS UNIT PRICE TOTAL
1 MOBILIZATION 1 LS 1 40,500,00 i. 40,500,00
2 CLEARING FOR 150' R/W 45.50 AC 1 8,000.00 1. 384,000.00
3 BASE COURSE (10 IN.)
BINDER SURFACE (2,25 IN.)
61,711 SY 1 $18.00 1,110,798.00
4 61,711 SY $ $14.00 863,954.00
5 WEARING SURFACE (1.75 IN.) 61,711 SY $ $11.00 678,821.00
6 PRIME COAT 61,711 SY $ $1.00 61,711.00
TACK COAT7 SY61,711 $ $1.00 61,711,00
4" CONDUIT9 1250 LF $ 8.00 $ 10,000.00
6" CONDUIT10 1250 LF $ 12.00 $ 15,000.00
11 EROSION CONTROL LS1 1 £300,000,00 300,000,00
ROADWAY GRADING12 SY $213,311 7.00 $ 1,493,177.00
GRASSING13 151,600 SY $ 0.70 £ 106,120,00
14 REMOVE UNSUITABLE (MUCK) CY71,104 £ £15.00 1,066,560.00
15 SELECT FILL FOR ROAD CY142,208 £ £25.00 3,555,200.00
16 STORM DRAINAGE JOB LS £ 2,000,00000 £ 2,000,00000
SANITARY SEWER17 JOB LS $ 660,000.00 $ 660,000,00
WATER18 JOB LS $ 330,000.00 $ 330,000.00
OUTFALL LAGOON/DITCHING19 LS1 $ 750,000,00 $ 750,000.00
6" SGD ( PERFORATED W/ STONE AND
FILTER FABRIC)___________________20 LF20,508 $ $20.00 410,160.00
STONE BACKFILL21 CY280 $ $40.00 11,200,00
SAND BACKFILL22 CY50 $ $10.00 500.00
TRAFFIC CONTROL LS23 $1 704,000.00 $ 704,000.00
4" WHITE SOLID LINE THERMOPLASTIC24 LF19198 $ $0.60 11,518,80
4" YELLOW SOLID LINE THERMOPLASTIC25 19198 LF $ 0.60 $ 11,518,80
24" WHITE SOLID LINE 125 MIL26 LF $160 $6.50 1,040.00
WHITE SINGLE ARROWS TYPE 227 12 EA $ $75.00 900.00
YELOW PAVEMENT MARKERS BI-DIR.28 240 EA $ 6.50 $ 1,560.00
PERMANENT SIGNING29 LS1 $ 5,000.00 $ 5,000.00
SUB-TOTAL EARTHWORK, PAVING, GRADING AND DRAINAGE $ 14,624,949,60
5% CONTINGENCY $ 731,247,48
7% ENGINEERNG, PLANNING, PERMITTING, LEGAL AND SURVEYING $ 1,023,746,47
TOTAL: RIVERPORT PARKWAY SOUTH Purrysburg road - south of i-95) (2 INITIAL LANES) $ 16,379,943,55
COST PER MILE $ 4,504,953,74
COST PER LINEAR FOOT £ 853.21
OPINIONS OF PROBABLE COST
Since the engineer has no control over the cost of labor, materials, equipment, the Contractor’s
methods of determining prices, or over competitive bidding or market conditions, his Opinions of Probable
Construction Costs provided herein are to be made on the basis of his experience and qualifications.
These opinions represent his best judgment as a design professional familiar with the construction
industry.
* THIS ESTIMATE IS BASED UPON A CONCEPTUAL ROUTING FOR RIVERPORT PARKWAY SOUTH. NO DESIGN INFORMATION IS AVAILABLE AT THIS TIME.
PAGE 1 OF 2
Z:\24863\24863.0000\Engineering\Calculations\Quantity Take OfACopy of Exit 3-RiverPort Parkway - SIB Improvements Opinion of Cost UPDATED VERSION 6-26-2023.xlsx
RIVERPORT PARKWAY SOUTH (purrysburg road south of 1-95) 4 LANE DIVIDED ROADWAY
HARDEEVILLE, SC
THOMAS & HUTTON ENGINEERING CO.
DATE : 10/25/07
REVISED: 06/26/23
BY : JLM/SSF
JOB : 20995 / 24863
EARTHWORK, PAVING, GRADING AND DRAINAGE- FOR IMPROVEMENTS TO RIVERPORT PARKWAY SOUTH - ADDITIONAL 2 LANES
ITEM DESCRIPTION QUANTITY UNITS UNIT PRICE TOTAL
1 MOBILIZATION LS1 S $40,500.00 40,500,00
2 BASE COURSE (10 IN.) SY61,711 $ 28.00 1 1,727,908.00
BINDER SURFACE (2.25 IN.)3 61,711 SY 9 14.00 $ 863,954.00
4 WEARING SURFACE (1.75 IN.) SY61,711 $ 11.00 $ 678,821.00
5 PRIME COAT 61,711 SY $ 1.00 $ 61,711.00
TACK COAT6 SY61,711 $ 1.00 $ 61,711.00
7
4" CONDUIT8 1250 LF $ 8.00 $ 10,000.00
9 6" CONDUIT LF1250 $ 512.00 15,000.00
10 EROSION CONTROL LS1 $ 350,000,00 1 350,000.00
ROADWAY GRADING11 SY106,656 i. 7.00 _$ 746,592.00
GRASSING12 SY44,945 i. 0.70 1 31,461.50
13 REMOVE UNSUITABLE (MUCK) CY36,974 1 115.00 554,610.00
14 SELECT FILL FOR ROAD CY73,948 i. 25.00 1 1,848,700.00
15 STORM DRAINAGE JOB LS 1. 2,000,000.00 A. 2,000,000.00
SANITARY SEWER16 JOB LS $ 660,000.00 $ 660,000.00
17 WATER JOB LS $ $330,000.00 330,000.00
OUTFALL LAGOONS/DITCHING48 LS1 $ 250,000.00 $ 250,000.00
6” SGD ( PERFORATED W/ STONE AND
FILTER FABRIC)______________________4S 20,508 LF $ 20.00 $ 410,160.00
STONE BACKFILL20 280 CY $ 40.00 $ 11,200.00
SAND BACKFILL21 CY560 $ 10.00 $ 5,600.00
TRAFFIC CONTROL22 LS1 $ 672,000.00 $ 672,000,00
4" WHITE SOLID LINE THERMOPLASTIC23 19198 LF $ 0.60 $ 11,518.80
4" YELLOW SOLID LINE THERMOPLASTIC24 19198 LF $ $0.60 11,518.80
24” WHITE SOLID LINE 125 MIL25 160 LF $ 6.50 $ 1,040.00
WHITE SINGLE ARROWS TYPE 226 EA12 $ 75.00 $ 900.00
YELOW PAVEMENT MARKERS BI-DIR.27 240 EA $ 6.50 $ 1,560,00
PERMANENT SIGNING28 1 LS $ $5,000,00 5,000.00
SUB-TOTAL EARTHWORK, PAVING, GRADING AND DRAINAGE 1 11,361,466.10
5% CONTINGENCY $ 568,073.31
7% ENGINEERNG, PLANNING, PERMITTING, LEGAL AND SURVEYING $ 795,302.63
TOTAL: PURRYSBURG ROAD SOUTH OF I-9S (ADDITIONAL 2 LANES) $ 12,724,842.04
COST PER MILE $ 3,499,696.11
COST PER LINEAR FOOT 1 662.82
OPINIONS OF PROBABLE COST
Since the engineer has no control over the cost of labor, materials, equipment, the Contractor's
methods of determining prices, or over competitive bidding or market conditions, his Opinions of Probable
Construction Costs provided herein are to be made on the basis of his experience and qualifications.
These opinions represent his best judgment as a design professional familiar with the construction
industry.
* THIS ESTIMATE IS BASED UPON A CONCEPTUAL ROUTING FOR PURRYSBURG ROAD. NO DESIGN INFORMATION IS AVAILABLE AT THIS TIME.
PAGE 2 OF 2
Z:\24863\24863.0000\Engineering\Calculations\Quantity Take Off\Copy of Exit 3-RiverPort Parkway - SIB Improvements Opinion of Cost UPDATED VERSION 6-26-2023.xlsx
52939552 v1
SIGNATURE PAGE FOR JASPER COUNTY
IN WITNESS WHEREOF, Jasper County has caused this Loan Agreement to be e xecuted on its
behalf and its seal to be affixed hereto.
JASPER COUNTY, SOUTH CAROLINA
By:
Printed Name:
Title:
ATTEST:
By:
Printed Name:
Title:
(SEAL)
Note: The Jasper County Council authorized the execution of this Loan Agreement by adoption of
Ordinance _____ on _______________, 2024.
A-3
52939552 v1
IN WITNESS WHEREOF, the Project Sponsors have executed this Note by the manual signatures
of the Mayor of the City and the County Administrator of the County, all as of the _____ day of
__________, 2024.
CITY OF HARDEEVILLE, SOUTH CAROLINA
By:
Mayor
JASPER COUNTY, SOUTH CAROLINA
By:
County Administrator
PPAB 10067145v2 3
Done in a meeting duly assembled this 6th day of November, 2023.
JASPER COUNTY, SOUTH CAROLINA
By: __________________________________________
Martin L. Sauls, IV, Chairman, County Council
Jasper County, South Carolina
[SEAL]
Attest:
By: ________________________________________
Wanda Simmons, Clerk to County Council
Jasper County, South Carolina
First Reading: November 6, 2023
Second Reading: December 4, 2023
Public Hearing: February 5, 2024
Third Reading: December 4, 2023
Reviewed for form and draftsmanship by Jasper County Attorney
___________________________________
David L. Tedder Date
PPAB 8140012v11
SIGNATURE PAGE FOR JASPER COUNTY
IN WITNESS WHEREOF, Jasper County has caused this Agreement to be executed on its
behalf and its seal to be affixed hereto.
JASPER COUNTY, SOUTH CAROLINA
By:
(SEAL) Printed Name:
Title:
Attest:
By:
Printed Name:
Title:
Note: The execution of this Agreement was authorized and approved by Ordinance _____
adopted by the Jasper County Council on __________, 2023.
52683113 v2
STATE OF SOUTH CAROLINA
COUNTY COUNCIL FOR JASPER COUNTY
ORDINANCE NO. __________
AUTHORIZING THE EXECUTION AND DELIVERY OF A FEE-IN-LIEU
OF AD VALOREM TAXES AND INCENTIVE AGREEMENT BY AND
BETWEEN JASPER COUNTY, SOUTH CAROLINA AND PROJECT
INSTALL TO PROVIDE FOR PAYMENT OF A FEE-IN-LIEU OF TAXES;
APPROVING THE CREATION OF A MULTICOUNTY PARK WITH
HAMPTON COUNTY, SOUTH CAROLINA; AUTHORIZING THE
EXECUTION AND DELIVERY OF A MULTICOUNTY PARK
AGREEMENT BY AND BETWEEN JASPER COUNTY, SOUTH
CAROLINA AND HAMPTON COUNTY, SOUTH CAROLINA ;
AUTHORIZING CERTAIN INFRASTRUCTURE CREDITS AND; AND
OTHER RELATED MATTERS.
WHEREAS, Jasper County, South Carolina (“County”), acting by and through its County Council
(“County Council”) is authorized pursuant to the provisions of Title 12, Chapter 44, Code of Laws of South
Carolina, 1976, as amended (“FILOT Act”), to encourage manufacturing and commercial enterprises to
locate in the State of South Carolina (“South Carolina” or “State”) or to encourage manufacturing and
commercial enterprises now located in the State to expand their investments and thus make use of and
employ the manpower, products, and other resources of the State by entering into an agreement with a
sponsor, as defined in the FILOT Act, that provides for the payment of a fee -in-lieu of ad valorem tax
(“FILOT Payments”), with respect to economic development property, as defined in the FILOT Act;
WHEREAS, pursuant to Article VIII, Section 13 of the South Carolina Constitution and Title 4, Section
1, Code of Laws of South Carolina, 1976, as amended (collectively, “MCIP Act”), the County is authorized
to jointly develop multicounty parks with counties having contiguous borders with the County and, in the
County’s discretion, include property within the boundaries of such multicounty parks. Under the authority
provided in the MCIP Act, the County wishes to create a multicounty park with Hampton County, South
Carolina more particularly known as the Project Install Park (“Park”) by entering into an Agreement for
Development of a Joint County Industrial and Business Park (Project Install) the form of which is attached
here as Exhibit B (“Park Agreement”);
WHEREAS, pursuant to the FILOT and MCIP Acts, the County is authorized to provide credits
(“Infrastructure Credits”) against FILOT Payments derived from economic development property to pay
costs of designing, acquiring, constructing, improving or expandin g (i) infrastructure serving a project or
the County and (ii) improved and unimproved real estate and personal property used in the operation of a
commercial enterprise or manufacturing facility (“Infrastructure”);
WHEREAS, Project Install (“Sponsor”), desires to expand a steel products manufacturing facility in
the County (“Project”) consisting of taxable investment in real and personal property of not less than $11
million and the creation of 14, new full-time jobs; and
WHEREAS, at the request of the Sponsor and as an inducement to locate the Project in the County, the
County desires to enter into a Fee-in-Lieu of Ad Valorem Taxes and Incentive Agreement with the Sponsor,
as Sponsor, the form of which is attached as Exhibit A (“Fee Agreement”), pursuant to which the County
will provide certain incentives to the Sponsor with respect to the Project, including (i) providing for FILOT
Payments, to be calculated as set forth in the Fee Agreement, with respect to the portion of the Project
which constitutes economic development property; and (2) locating the Project in the Park; and (3)
2
52683113 v2
providing Infrastructure Credits and other incentives, as described in the Fee Agreement, to assist in paying
the costs of certain Infrastructure.
NOW THEREFORE, BE IT ORDAINED, by the County Council as follows:
Section 1. Statutory Findings. Based on information supplied to the County by the Sponsor, County
Council evaluated the Project based on relevant criteria including, the purposes the Project is to accomplish,
the anticipated dollar amount and nature of the investment, employment to be c reated, and the anticipated
costs and benefits to the County, and hereby finds:
(a) The Project is anticipated to benefit the general public welfare of the County by providing services,
employment, recreation, or other public benefits not otherwise adequately provided locally;
(b) The Project gives rise to no pecuniary liability of the County or incorporated municipality or a
charge against its general credit or taxing power;
(c) The purposes to be accomplished by the Project are proper governmental and public purposes and
the benefits of the Project are greater than the costs.
Section 2. Approval of Incentives; Authorization to Execute and Deliver Fee Agreement. The
incentives as described in this Ordinance (“Ordinance”), and as more particularly set forth in the Fee
Agreement, with respect to the Project are hereby approved. The form, terms and provisions of the Fee
Agreement that is before this meeting are appro ved and all of the Fee Agreement’s terms and conditions
are incorporated in this Ordinance by reference. The Chair of County Council (“Chair”) is authorized and
directed to execute the Fee Agreement in the name of and on behalf of the County, subject to the approval
of any revisions or changes as are not materially adverse to the County by the County Administrator and
counsel to the County, and the Clerk to County Council is hereby authorized and directed to attest the Fee
Agreement and to deliver the Fee Agreement to the Sponsor.
Section 3. Inclusion within the Park. The creation of the Park and the inclusion of the Project in the
Park is authorized and approved. The Chair, the County Administrator and the Clerk to County Council are
each authorized to execute such documents and take such further actions as may be necessary to complete
the expansion of the Park boundaries. The Park Agreement is approved and will be complete on adoption
of this Ordinance by County Council and the adoption of an approving companion ordinance by the
Hampton County, South Carolina.
Section 4. Further Assurances. The County Council confirms the authority of the Chair, the County
Administrator, the Director of Economic Development, the Clerk to County Council, and various other
County officials and staff, acting at the direction of the Chair, the County Administrator, the Director of
Economic Development or Clerk to County Council, as appropriate, to take whatever further action and to
negotiate, execute and deliver whatever further documents as may be appropriate to effect the intent of this
Ordinance and the incentives offered to the Sponsor under this Ordinance and the Fee Agreement.
Section 5. Savings Clause. The provisions of this Ordinance are separable. If any part of this Ordinance
is, for any reason, unenforceable then the validity of the remainder of this Ordinance is unaffected.
Section 6. General Repealer. Any prior ordinance, resolution, or order, the terms of which are in
conflict with this Ordinance, is, only to the extent of that conflict, repealed.
Section 7. Effectiveness. This Ordinance is effective after its third reading and public hearing.
3
52683113 v2
JASPER COUNTY, SOUTH CAROLINA
Chair, Jasper County Council
(SEAL)
ATTEST:
Clerk of Council, Jasper County Council
First Reading: February 5, 2024
Second Reading: [March 4, 2024]
Public Hearing: [March 4, 2024]
Third Reading: [March 18, 2024]
52683113 v2
EXHIBIT A
FORM OF FEE AGREEMENT
5
52683113 v2
EXHIBIT B
FORM OF PARK AGREEMENT
52791662 v2
STATE OF SOUTH CAROLINA
COUNTY OF JASPER
COUNTY OF HAMPTON
)
)
)
)
)
)
AGREEMENT FOR DEVELOPMENT OF
A JOINT COUNTY INDUSTRIAL AND
BUSINESS PARK (PROJECT INSTALL)
THIS AGREEMENT for the development of a joint county industrial and business park
to be located within Jasper County and Hampton County is made and entered into as of [March
18, 2024], by and between Jasper County, South Carolina (“Jasper County”) and Hampton County,
South Carolina (“Hampton County”).
RECITALS
WHEREAS, Jasper County and Hampton County are contiguous counties which, pursuant
to Ordinance No. [XX] enacted by Jasper County Council on [March 18, 2024], and Ordinance
No. [XX], enacted by Hampton County Council on [March 18, 2024], have each determined that,
in order to promote economic development and thus encourage investment and provide additional
employment opportunities within both of said counties, there should be developed in Jasper
County and Hampton County a joint county i ndustrial and busines s park (the Jasper
County/Hampton County Park (Project Install), referred to herein as the “Park”), to be located
upon property more particularly described in Exhibit A hereto; and
WHEREAS, as a consequence of the development of the Park, property comprising the
Park and all property having a situs therein is exempt from ad valorem taxation pursuant to Article
VIII, Section 13(D) of the South Carolina Constitution, but the owners or lessees of such property
shall pay annual fees in an amount equivalent to the property taxes or other in -lieu-of payments
that would have been due and payable except for such exemption.
NOW, THEREFORE , in consideration of the mutual agreement, representations and
benefits contained in this Agreement and for other good and valuable consideration, the receipt
and sufficiency of which are hereby acknowledged, the parties agree as follows:
1. Binding Agreement. This Agreement serves as a written instrument setting forth
the entire agreement between the parties and shall be binding on Jasper County and Hampton
County, their successors and assigns.
2. Authorization. Article VIII, Section 13(D) of the South Carolina Constitution
provides that counties may jointly develop an industrial or business park with other counties within
the geographical boundaries of one or more of the member counties, provided that certain
conditions specified therein are met and further provided that the General Assembly of the State
of South Carolina provides by law a manner in which the value of property in such park will be
considered for purposes of bonded indebtedness of political subdivisions and school districts and
for purposes of computing the index of taxpaying ability pursuant to any provision of law which
measures the relative fiscal capacity of a school district to support its schools based on the assessed
valuation of taxable property in the district as compared to the assessed valuation of taxable
property in all school districts in South Carolina. The Code of Laws of South Carolina, 1976, as
2
52791662 v2
amended (the “Code”) and particularly, Section 4-1-170 thereof, satisfies the conditions imposed
by Article VIII, Section 13(D) of the South Carolina Constitution and provides the statutory
vehicle whereby a joint county industrial or business park may be created.
3. Location of the Park.
(A) As of the original execution and delivery of this Agreement, the Park initially
consists of property that is located in Jasper County and which is now or is anticipated to be owned
and/or operated by [Project Install] (collectively, the “Company”), as more particularly described
in Exhibit A (Jasper Property) hereto. It is specifically recognized that the Park may from time to
time consist of non-contiguous properties within each county. The boundaries of the Park may be
enlarged or diminished from ti me to time as authorized by unilateral ordinance of the county
council of the County in which the property to be added to the Park is located. If any property
proposed for inclusion in the Park is located, at the time such inclusion is proposed, within the
boundaries of a municipality, then the municipality must give its consent prior to the inclusion of
the property in the Park.
(B) In the event of any enlargement or diminution of the boundaries of the Park, this
Agreement shall be deemed amended and there shall be attached hereto a revised Exhibit A (Jasper
Property) or a revised Exhibit B (Hampton Property) which shall contain a legal description of the
boundaries of the Park within Jasper County or Hampton County, as the case may be, as enlarged
or diminished, together with a copy of the ordinance of the county council pursuant to which such
enlargement or diminution was authorized.
(C) Prior to the adoption by the respective county council of an ordinance authorizing
the diminution of the boundaries of the Park, a public hearing shall first be held by such county
council. Notice of such public hearing shall be published in a newspaper of general circulation in
the respective county at least once and not less than fifteen (15) days prior to such hearing. Notice
of such public hearing shall also be served in the manner of service of process at least fifteen (15)
days prior to such pub lic hearing upon the owner and, if applicable, the lessee of any property
which would be excluded from the Park by virtue of the diminution.
4. Fee in Lieu of Taxes. Pursuant to Article VIII, Section 13(D) of the South Carolina
Constitution, all property located in the Park is exempt from all ad valorem taxation. The owners
or lessees of any property situated in the Park shall pay in accordance with this Agreement an
amount (referred to as fees in lieu of ad valorem taxes) equivalent to the ad valorem taxes or other
in-lieu-of payments that would have been due and payable but for the location of such property
within the Park.
5. Allocation of Expenses. Jasper County and Hampton County shall bear expenses
incurred in connection with the Park, including, but not limited to, those incurred in the
administration, development, operation, maintenance and promotion of the Park, in the following
proportions:
If the property is located in the Jasper County portion of the Park:
A. Jasper County 100%
B. Hampton