MEMBERS OF LANCASTER COUNTY PLANNING COMMISSION
VACANT , DISTRICT 1
T. YOKIMA CURETON , DISTRICT 2
LYNETTE HINSON , DISTRICT 3
JUDIANNA TINKLENBERG , DISTRICT 4
CHAIR : MICHELLE RICHARDS , DISTRICT 5
SHEILA HINSON , DISTRICT 6
FRANCES LIU, DISTRICT 7
SECRETARY : MARA MATA
MINUTES OF THE LANCASTER COUNTY PLANNING COMMISSION
WORKSHOP MEETING
April 2, 2026 5:00 P.M.
MINUTES
Chairman Richards called the meeting to order at 5:02 p.m.
1. Roll Call:
Commissioners Present:
T. Yokima Cureton, District 2 Judianna Tinklenberg, Dist. 4
Michelle Richards, Dist. 5 Sheila Hinson, Dist. 6
Absent: Lynette Hinson; Frances Liu
Staff Present:
April Williams, Planning Director Corey Barnes, Planner
Matthew Blaszyk, Planner Kirsten Willis, Planner
Jennifer Bryan, Planning Technician Admin. Assistant: Mara Mata
The following press were notified of the meeting by email in accordance with the
Freedom of Information Act: The Lancaster News, Kershaw News Era, The Rock Hill
Herald, The Fort Mill Times, Cable News 2, Channel 9, and the local Government
Channel.
2. New Business
a. CU-2026-0168: Mohammad
Application by Arafath Mohammad and Waxlan Investment LLC for a Conditional Use
permit for parcel of 4.7 acres at 10935 Harrisburg Road (TM 0003-00-048.00) to allow
the property to be used as a Place of Assembly.
Staff Presentation: Kirsten Willis
Discussion:
• Religion associated with place of assembly
• Possible impact of Mosque services affecting the neighborhood and current
population
• Surrounding use is residential
• Existing mosque nearby
• Possible traffic
• Building occupancy maximum
2
CU-2026-0168: Mohammad Continued:
• Plans for existing structures on property
• Aspects of religious gatherings such as frequency of meeting and use of bells
• Questions regarding discussion at scheduled PC meeting on 4/21
• Proposed use is not residential
b. RZ-2026-0409: Freeman
Application by Russell Freeman and Paws In the Panhandle Inc to rezone 0.61 acre
portion of TM 0049-00-037.00 from Low Density Residential (LDR) to Medium Density
Residential (MDR), in order to allow the acreage to be conjoined to his existing
adjacent lot (TM 0049K-0A-050.00) at 4059 Flint Drive.
Staff Presentation: Jennifer Bryan
Discussion:
• Land locked portion
• Letter provided that there will be access to land locked portion
c. RZ-2026-0322: Lopez/Steele St
Application by Jose Lopez to rezone a parcel of 0.335 acres located at 1824 Steele
Street (TM 0086C-0N-003.01) from Manufactured Home (MH) to Professional
Business (PB), in order to allow renovation and use of existing non-conforming multi-
family units.
Staff Presentation: Kirsten Willis
Discussion:
• Why the applicant has requested PB
• Existing use not in zoning compliance vs spot zoning
d. RZ-2026-0308: Rollins
Application by Nicholas Rollins, McTann LLC and Cauthen & Patterson LLC to rezone
a parcel of 2.14 acres at Shelton Street near the intersection of Jubilee Ln (TM 0087J-
0A-012.00) from General Business (GB ) to Professional Business (PB), in order to
remedy the non-conforming use of existing multi-family units.
Staff Presentation: Kirsten Willis
Discussion:
• The Commission had no questions or concerns to share.
3
e. NRN-2026-0402: Hillview Acres Drive
Application by Lisa Giovaniello for Hillview Acres LLC to name a private drive at and
adjacent to new parcels platted off Ander Vincent Road at TM 0020-00-020.01. The
driveway is located approximately 0.22 miles south of the intersection with Outlaw
Ave. Application pursuant to Sec. 6.11.4.G of the Unified Development Ordinance.
The name of the private drive is Hillview Acres Drive.
Staff Presentation: Jennifer Bryan
Discussion:
• Number of homes that can access private drive
f. NRN-2026-0417: Legacy Pointe Place
Application by Legacy Pointe Indian Land, LLC and E911 Addressing via Preliminary
Plats or Civil Plans to name a private road, pursuant to Sec.6.4.11 of the Unified
Development Ordinance. The proposed road name is Legacy Pointe Place
Staff Presentation: Jennifer Bryan
Discussion:
• The Commission had no questions or concerns to share.
3. Other:
a. The Commission asked for clarification on when Agenda is posted
• FOIA requires 24 hours
• Information cannot be distrusted prior to being published
b. CAPITAL IMPROVEMENT PLAN:
Discussion of FY2021-2031 Capital Improvement Plan and associated funding
requests for FY2027, in alignment with the provisions of the Comprehensive Plan.
Staff Presentation: April Williams
Discussion:
• Funded project sources
• Difference between a Grant writer and Grant administrator
4. Adjourn
Chairman Richards motioned to adjourn.
Meeting was adjourned at 5:34 PM
Project Rank Project Owner Project Name CIP Bucket Project Amount Funding Source
Airport 12K Stainless Steel Tanks
Approved Projects, Scheduled for
FY27 Start 1,000,000 No funding source identified
Animal Shelter
Add-on Space for Animal Control
Officers New Capital Project Request 120,000 No funding source identified
Development Services Building/Office Space
Approved Projects, Scheduled for
FY27 Start 4,000,000 No funding source identified
Economic Development*
Spec Building (Health Springs Lot
Improvement)
Approved Projects, Scheduled for
FY27 Start 2,000,000 1x Fund Balance Appropriation
Emergency Medical Services** EMS Station 3 (City of Lancaster) Approved CIP Project, unfunded 1,800,000 No funding source identified
Emergency Medical Services** EMS Station 6 (Town of Kershaw) Approved CIP Project, unfunded 1,800,000 No funding source identified
Emergency Medical Services** EMS Combination Station Approved CIP Project, unfunded 4,000,000 No funding source identified
Fire Rescue
Riverchase Development Agreement
Fire Station New Capital Project Request 6,228,000 No funding source identified
Fire Rescue Fire Service County Training Center New Capital Project Request 26,228,000 No funding source identified
Indian Land Consolidated Fire Service District Concrete - Fire Station 1 New Capital Project Request 320,000 No funding source identified
Indian Land Consolidated Fire Service District Station 3 Construction Approved CIP Project, unfunded 10,725,000 No funding source identified
Indian Land Consolidated Fire Service District Station 3 Engine Approved CIP Project, unfunded 1,300,000 No funding source identified
Information Technology*
Public Safety Dispatch and Records
Management New Capital Project Request 8,003,933 No funding source identified
Parks & Recreation Walnut Creek Soccer Fields
Approved Projects, Scheduled for
FY27 Start 2,108,739 CPST3 and General Fund Millage
Parks & Recreation
Flat Creek Improvements
(Playground and Walking Track) New Capital Project Request 600,000 No funding source identified
Parks & Recreation 13 Passenger Bus (x4) New Capital Project Request 513,960 No funding source identified
Parks & Recreation 45 Passenger Bus (x3) New Capital Project Request 587,940 No funding source identified
Planning Commission EMS Microhub New Capital Project Request 1,200,000 No funding source identified
Planning Commission
Workforce/Affordable Housing
Land Control Fund New Capital Project Request 1,000,000 No funding source identified
Public Safety Communications Generator Replacement New Capital Project Request 300,000 No funding source identified
Public Safety Communications Radio Console Replacement (x12) New Capital Project Request 1,900,000 No funding source identified
Public Safety Communications Fire Dispatch CAD Integration New Capital Project Request 750,000 No funding source identified
Road Maintenance Caterpillar 930 Wheel Loader (1) New Capital Project Request 294,701 No funding source identified
Sheriff*
Parking Lot Repair and modification
(SHF Main) New Capital Project Request 451,220 No funding source identified
TOTAL 77,231,493
*Quote for project was submitted after the request form submittal date.
**Amount requested is original project estimate. This amount will increase if approved for Funding in FY27.
Capital Project Summary Sheet and Planning Commission Ranking
Waiting on completion of Hangar project
This project comprises the installation of two twelve-thousand gallon steel tanks for aviation fuel. These tanks will be installed
after the completion of the Hangar project.
Lancaster County Airport
215
$1,000,000.00
12K Stainless Steel Tanks
12-11-2025
549-CIP Update
2
Animal Shelter
318
$100,000.00
$20,000.00
$120,000.00
$0.00
$120,000.00
Non-Mandated
No
We have run out of space here at the Animal Shelter. W e need office space for the Animal Control officers. It would work out well if we
had enough space to have for the reclaims as well to insure all ordinances is up to date upon reclaiming animals.
12-12-2025
Add on space for Animal Control Officers
311-Capital
12-12-2025
Quote pending
Animal Shelter Act Ln Special Projects (NEED
ACCOUNT LINE)
3
As of December 2025, no project update for the Development Services Building was submitted
4
5% (Due Diligence
This Project should bring another employer into the County offering good and higher-paying jobs, as well as to add a new
revenue source for the County
. The Economic Development Advisory Board supported the selection of Heath Springs
Business Park as the next area to improve. With only one company now in the Heath Springs Business Park, and with a
significant need in that area for another employers (ADM closed down in nearby Kershaw), this was the logical development
choice. The project will focus on clearing brush and scrub trees and grading the Lot identified next to the Soccer Field (with
appropriate buffers). We will also install an appropriate ingress and culvert. Mead & Hunt has completed much due diligence
work so far, 50% of which (around $50K) is to be funded by the SCDOC. Other funds include $165K from Comporium. We
would like to start site work as soon as possible, targeting July given funding needs.
We will continue to seek external grants to support this project and possibly reduce the County's portion.
Economic Development
007
$0.00
Heath Springs Lot Improvement
✔
✔
03-27-2026
December 31, 2027
569-CIP Update
5
No funding approved
Replacement for station which needs to be relocated to better serve the population it currently serves. No funding has been
approved, and no property has been identified. Budget will need
to be adjusted up to cover increases in cost since quotes
were provided.
EMS
153
$1,800,000.00
EMS Station 3
✔
11-22-2025
12-05-2025
June 30, 2027
512-CIP Update
6
No funding approved.
Replacement for station which needs to be relocated to better serve the population it currently serves. No funding has been
approved, and no property has been identified. Budget will need
to be adjusted up to cover increases in cost since quotes
were provided.
EMS
153
$1,800,000.00
EMS Station 6
✔
11-22-2025
12-05-2025
June 30, 2027
513-CIP Update
7
No funding approved
Combination station for EMS in the city which would allow for the closure of the current EMS 1 and EMS 2 stations. This
would free up land and provide some possible revenue with the selling of EMS 2. However, no land has been identified, and
no funding source has been approved. This concept was planning to get ahead of the many housing developments coming
in and around the city of Lancaster and to move staff out of a station built in the early 1900's. The idea was also floated by
me for a true emergency response station and include a fire station to provide for the future of needed full time fire response.
The funding will need to be increased based on current cost trends and the possible size of the station.
EMS
153
$4,000,000.00
EMS Combo Station
✔
11-22-2025
12-05-2025
June 30, 2026
509-CIP Update
8
Fire Rescue
144
$5,000,000.00
$1,000,000.00
$18,000.00
$6,200,000.00
$10,000.00
$28,000.00
$6,228,000.00
Mandated
No
The development agreement Riverchase Developers signe d with the county has included within its requirements the developers keep in
escrow a certain amount per lot as it is built/CO'd until a certain number of building permits is reached. Once the county accepts those
funds at the completion of the Developer's side of the agreement, a timeline may start requiring completion of a fire station on land also
provided by the developers. The escrowed funds will not be sufficient to build a necessary fire station. Further cost study needs to be
done to ascertain more accurate costs estimates and needs for a station to be staffed and/or occupied.
12-12-2025
$200,000.00
Riverchase Developement Agreement Fire Station
✔ ✔
315-Capital
12-18-2025
Need account lines for Utilities General ($18K) and Maintenance Service Agreements in 144 ($10K) (Ask Mo)
Special Projects
Act Ln # 10-7-144-690-00 at $6,200,000
Development Agreement on file with Finance and Building - FS on page 8
9
Fire Rescue
$1,000,000.00
144
$1,500,000.00
$5,000,000.00
$15,000,000.00
$3,000,000.00
$18,000.00
$26,200,000.00
$10,000.00
$28,000.00
$26,228,000.00
Non-Mandated
No
The construction of a Live Fire Training facility will assist in training of volunteers and career personnel by having such a facility in close
proximity to the training. This will alleviate the current requirement of traveling to Columbia to the SC Fire Academy . The model priced is
from Fire Facilities Inc. This facility would be constructed on land already owned by Lancaster County in the general area of the existing
Sheriff’s Office. This facility is configured in such a way to be amenable to Law Enforcement tactical training as well. The presence of a
fire training facility burn building in county also allows Insurance Service Organization (ISO) points credit this county cannot currently
accrue.
12-12-2025
$500,000.00
$200,000.00
Fire Service County Training Center
✔ ✔ ✔
316-Capital
12-18-2025
Spec Projects Act Ln 10-7-144-690-00 at $26.2M
Need Utilities and Maintenance Service
Agreement account lines in 144 (Ask Mo)
10
Indian Land Fire District
$320,000.00
940
$0.00
$320,000.00
$0.00
$320,000.00
Non-Mandated
No
The existing lightweight asphalt surfaces are not des igned to withstand the substantial weight and repeated movement of fire apparatus.
Over time, this has led to premature cracking, sinking, and structural deterioration, which increases maintenance costs and poses safety
concerns for apparatus operations. Replacing all lightweight asphalt with reinforced concrete will provide a durable, long-term solution
capable of supporting heavy emergency vehicles, reducing future repair needs, and ensuring safe, reliable access for crews and
equipment. This investment protects district assets, improves operational efficiency, and supports the long-term functionality of the
station.
12-11-2025
Concrete for station 1
✔ ✔
317-Capital
12-17-2025
Quote provided - Land Improvement - Fund 52 Special Projects - 52-7-940-690-00 JP
11
Not Funded
The northern part of the district has experienced significant growth in population, development, and call volume, creating an
urgent need for a new fire station to maintain ef
fective emergency coverage. As residential and commercial expansion
continues, current response times in the area are increasingly challenged due to the distance from existing stations and the
rising demand for fire, EMS, and all-hazard services. A new station in this area will strategically improve response times,
enhance firefighter safety, and ensure that critical life-saving resources are positioned closer to the residents and businesses
they serve. Establishing this station will also strengthen district-wide coverage, reduce strain on existing units, and support
future community growth. This project has been on the Capital Improvement Plan for several years, and construction costs
continue to rise, making timely approval and funding even more critical. The planned station is approximately 15,000 square
feet and will be capable of housing two companies, staffed with a total of eight firefighters per day. Investing in this northern
station is essential to maintaining reliable, timely, and high-quality emergency services for the district now and into the future.
Indian Land Fire District
940
$10,725,000.00
Fire Station 3
✔
12-11-2025
12-22-2025
552-CIP Update
12
Not funded
We are requesting an engine company for the proposed Station 3 located in the north end area. With construction of this
engine is projected to take approximately 46–48 months, securin
g approval and funding for this engine company now is
essential to ensure the station becomes fully operational shortly after completion. An engine company is the core response
unit needed to provide fire suppression, medical first response, and all-hazard emergency services to this rapidly growing
part of the district. Early authorization allows time for hiring, training, equipment procurement, and operational planning,
preventing service gaps and ensuring that the community receives immediate and reliable protection the moment the new
station opens. This proactive approach supports improved response times, enhanced coverage, and greater overall safety
for residents in the expanding north
Indian Land Fire District
940
$1,300,000.00
Fire Engine 3
✔
12-11-2025
12-22-2025
551-CIP Update
13
Information Technology
$0.00
026
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Non-Mandated
No
Replaces the County’s existing on-premise public safe ty dispatch, records, and jail management systems with a secure, cloud-based,
fully integrated platform for 911 call handling, emergency dispatch, records and case management, jail operations, reporting, and long-
term data access. This replacement modernizes critical public safety infrastructure, improves reliability and data security, reduces
downtime, and shifts ongoing maintenance, upgrades, and infrastructure management away from local IT resources.
12-12-2025
$0.00
$0.00
Public Safety Dispatch and Records Management
✔ ✔ ✔ ✔
312-Capital
12-12-2025
Tag Tim and Quote Pending
Where in the budget? IT? SHF? Public Communications? (AL
# XXXXX)
14
Parks & Recreation
801
$1,757,282.00
$351,456.40
$2,108,738.40
$0.00
$2,108,738.40
Non-Mandated
No
Replacing the grass soccer fields at Walnut Creek wit h artificial turf. This will give us more flexibility for our programs, avoid the
complicated process of trying to rest the fields and give the neighborhood a place to use throughout the year without worrying about
impacts of wear and tear. This is for the one large field and two smaller ones adjacent to it.
12-11-2025
Turfing Walnut Creek soccer fields
✔
308-Capital
12-12-2025
$1M in CPST3 dollars for Project; Act Ln # (NEED AN ACCOUNT LN CREATED)
CPST3 Ord No. 2020-1673
Dif
f is unfunded request in General Fund and Special Projects act line (10-7-801-690-00) at $1,108,739 - JP
15
Parks & Recreation
801
$500,000.00
$100,000.00
$600,000.00
$0.00
$600,000.00
Non-Mandated
No
We would like to renovate the walking track and renov ate the playground to offer a better experience for the community.
12-12-2025
Flat Creek Improvements
✔
314-Capital
12-12-2025
TurfField quote at $185K is on file w/ Budget - Cannot upload
PRK Special Projects
Act Ln 10-7-801-690-00 JP
16
Parks and Recreation
801
$498,000.00
$0.00
$5,000.00
$10,000.00
$498,960.00
$15,000.00
$513,960.00
Non-Mandated
No
This is to purchase 4 new 13 passenger buses
Ap
prox. $124,500*4 for bus unit - and Act Ln 10-7-801-560-00
Vehicle Mtn at $10K and Act Ln 10-7-801-590-00 for 4 bus units
Gas @ $5K and Act Ln 10-7-801-590-05 for 4 bus units
Geo Tabs @ $960 Act Ln 10-7-026-605-88
01-23-2026
$960.00
Mini Buses (x4)
✔
322-Capital
02-16-2026
Quote provided.
17
Parks and Recreation
801
$568,950.00
$0.00
$3,750.00
$15,000.00
$569,190.00
$18,750.00
$587,940.00
Non-Mandated
No
Equipment Capitalized 10-7-801-560-00 $568,950
Ma
intenance 10-7-801-590-00 $15,000
Gasoline 10-7-801-590-05 $3,750
Geo Tab 10-7-026-605-88 $240
02-17-2026
$240.00
45 Passenger Bus
✔
325-Capital
02-17-2026
Resubmitted to correct geotab $ amount
18
Submitted On:
Feb 27, 2026, 01:32PM EST
FY2027 Capital Project
Request Form (Planning
Commission to Planning
Staff)
Lancaster County
Full Name of Person Submitting
Form
First Name: Jennifer
Last Name: Bryan
REVISION: FY2027 Planning Commission Capital Improvement Plan Request: Project A – EMS Microhub
Original submitted 1/29/2026
Original Submitter:
Yokima Cureton
Revision Discussion: Planning Commission
Original Submission Location: Panhandle
Revision: In light of current development of Van Wyck EMS location, alternative locations are suggested. Due to rapid
growth in Panhandle and Greater Lancaster additional hubs will be needed. Consideration should be given to
expansion of existing facilities such as Hwy 521 Training Center, or upfit of existing buildings.
• Second Panhandle Location
• Hwy 521 Near Roselyn
Priority: MUST HAVE
Initial Capital Investment (2026): $1.0–$1.2 million
Capital Asset Type: Land + Building / Building Improvements
Useful Life: 40+ years (expandable)
Project Description & Need Fulfilled :
Lancaster County’s Panhandle area has experienced sustained residential growth that has outpaced the geographic
distribution of emergency medical services. This imbalance is exacerbated by increasing congestion along Highway
521, which is not scheduled for widening for approximately a decade.
This project proposes a modular EMS micro-hub, intentionally designed as a deployment asset, not a traditional full-
scale station. The initial build includes:
• 2–3 ambulance bays
• Crew rest and supply staging
• Modular construction allowing future vertical or lateral expansion
• Strategic land acquisition sized to support long-term growth
This approach directly addresses service proximity, which is the core operational challenge — not simply staffing or
equipment.
Expected Community Benefit
Immediate Benefits
• Reduced EMS response times in the County’s fastest-growing area
• Improved patient outcomes and survivability
• Increased reliability of emergency services despite congestion
19
Operational Benefits
• Reduced staff fatigue, overtime, and burnout
• Improved deployment efficiency without requiring new road capacity
• Strengthened resilience of public safety operations
Community Confidence
• Highly visible commitment to public safety
• Reinforces trust during a period of rapid growth
ROI & Fiscal V
alue
Operational ROI
• Avoids escalating overtime and attrition costs
• Improves workforce retention in a high-stress service area
• Defers the need for a larger, more expensive station until demand truly requires it
Capital ROI
• Long-lived, adaptable asset with expansion optionality
• Land acquisition locks in future value and avoids cost escalation
• Modular construction reduces upfront capital risk
Strategic ROI
• Buys time while transportation infrastructure lags behind growth
• Preserves County flexibility in future capital decisions
Risk of Inaction
• Continued degradation of EMS response times as congestion worsens
• Increased exposure to life-safety risk and reputational harm
• Higher future capital costs due to land price escalation
• Increased staff burnout and turnover
Inaction converts a manageable investment into an emergency response — at significantly higher cost.
Comprehensive Plan Alignment
This project advances:
• Community Facilities Element (emergency medical services and public safety)
• Priority Investment Element, by directing limited funds to the highest-risk growth area
• Resiliency Element, by strengthening emergency response under congestion and growth pressure
PROJECT 1: Panhandle EMS Micro-Hub + Strategic Land Acquisition
Capital Asset Categories (Applicable)
√ Land
• Acquisition of strategically located parcel(s)
• Future-proofed site sizing for expansion
20
√Building or Construction
• Modular EMS facility
• Ambulance bays, crew rest, supply staging
• Designed for long-term useful life and expansion
• Alternative: upfit or expansion of existing facilities/properties
√ Equipment
• EMS-related operational equipment (as part of deployment readiness)
•
Technology and systems required for EMS operations
√ Professional Services
• Site selection and due diligence
• Design and engineering (modular layout, expansion planning)
√ Furniture, Fixtures & Equipment (FF&E)
• Crew furnishings
• Storage systems
• Interior operational fixtures
√ Other (as applicable)
• Permitting
• Utility connections
• Site preparation and minor relocations
Strategic Alignment Categories (Applicable)
√Public Safety (Primary)
• Directly improves EMS response times and service reliability
√ Infrastructure
• Adds essential public safety infrastructure in a high-growth area
√ High Performance
• Improves operational efficiency and staff deployment
• Reduces overtime and burnout
√ Resource Optimization
• Modular, phased investment avoids overbuilding
• Maximizes impact per capital dollar
√ Strategic Alignment
• Directly implements Comprehensive Plan priorities
• Aligns service delivery with growth patterns
10-YEAR PRIORITY INVESTMENT SCHEDULE
(2026–2035) Year EMS Micro-Hub Strategic Outcome
2026 Land acquisition + modular hub Immediate life-safety improvement
21
2027 Operational optimization Service stabilization
2028 Facility expansion (if needed) Growth accommodated without crisis
2029 Capacity refinement Long-term life-safety improvement
Project Type: Select the type of
project being recommended. More
than one category can apply
.
Land: includes acquisition and sitework
Building or Construction: New facility or renovations
22
Submitted On:
Feb 27, 2026, 01:34PM EST
FY2027 Capital Project
Request Form (Planning
Commission to Planning
Staff)
Lancaster County
Full Name of Person Submitting
Form
First Name: Jennifer
Last Name: Bryan
REVISION: FY2027 Planning Commission Capital Improvement Plan Request: Project B – Workforce/Affordable
Housing Land Control Fund
Original submitted 1/29/2026
Original Submitter:
Yokima Cureton
Revision Discussion: Planning Commission
Revision: In light of current development of Housing Committee per recommendation of the Comprehensive Plan, this
proposal should be linked to the new Committee. Consideration should be given to what role the Committee will play in
the administration and disposition of this fund.
Priority: MUST HAVE
Initial Capital Investment (2026): $750,000 – $1.0 million
Capital Asset Type: Land Useful Life: Indefinite (appreciating public asset)
Project Description & Need Fulfilled
Lancaster County’s housing challenge is fundamentally a land control challenge. As growth accelerates, land prices
escalate faster than wages, displacing essential workers and increasing commute distances, congestion, and service
delivery strain.
This project establishes a County-controlled land acquisition fund to:
• Purchase 2–3 strategically located parcels near services and employment
• Prevent speculative price escalation
• Position the County as a leverage partner — not a housing developer
• Enable future workforce and affordable housing through nonprofit, LIHTC, and public-private partnerships
Expected Community Benefit
Workforce Stability
• Retains essential workers (EMS, fire, law enforcement, educators, healthcare)
• Reduces commute distances and congestion
Economic Development
• Supports employer recruitment and retention
• Stabilizes the local labor market
Community Outcomes
• Encourages mixed-income development
• Reduces long-term service and infrastructure strain
23
ROI & Fiscal Value
Leverage ROI
• County land contributions routinely unlock 4x–10x external capital
• One-time land investment avoids ongoing operating subsidies
Transportation & Infrastructure ROI
• Fewer vehicle miles traveled
• Reduced congestion pressure on County and state roadways
• Improved EMS routing efficiency
Long-T
erm Fiscal ROI
• Appreciating asset
• Avoids future crisis-driven housing interventions
• Preserves policy flexibility
Risk of Inaction
• Permanent loss of land opportunity
• Workforce displacement and longer commutes
• Increased congestion and EMS response challenges
• Higher long-term public costs with fewer available tools
Inaction guarantees higher cost with diminished leverage.
Comprehensive Plan Alignment
This project directly supports:
• Housing Element (workforce and affordable housing strategies)
• Economic Development Element (labor force stability)
• Priority Investment Element, by proactively addressing future infrastructure and service demand
Capital Asset Categories (Applicable)
√ Land (Primary)
• Acquisition of 2–3 strategically located parcels
• Long-term public land control
√ Professional Services
• Site evaluation and due diligence
• Legal structuring of land control agreements
• RFP development for future partnerships
√ Other
24
• Closing costs
• Title, survey
, and environmental assessments
(Note: No building or FF&E in initial phase — intentionally deferred for leverage and fiscal discipline.)
Strategic Alignment Categories (Applicable)
√ Quality Development (Primary)
• Enables intentional, mixed-income development
• Prevents speculative, uncoordinated growth
√Infrastructure
• Aligns housing location with existing services and facilities
√ Resource Optimization
• One-time land investment leverages multiple funding sources
• Avoids recurring subsidy costs
√ High Performance
• Stabilizes workforce supporting County operations and employers
√ Strategic Alignment
• Directly supports Housing, Economic Development, and Priority Investment elements of the Comprehensive Plan
10-YEAR PRIORITY INVESTMENT SCHEDULE
(2026–2035) Year Housing Land Fund Strategic Outcome
2026 Establish fund + initial parcels Land control
2027 Hold land, issue RFP framework Leverage prep
2028 Developer selection Growth accommodated without crisis
2029 Vertical housing development Workforce stabilization
Project Type: Select the type of
project being recommended. More
than one category can apply.
Land: includes acquisition and sitework
25
Public Safety Communications
130
$300,000.00
$0.00
$300,000.00
$0.00
$300,000.00
Non-Mandated
No
Replacing two Generators at LCPSC 911. Replacement co st is $150,000 per. Total cost will be $300.000.00 Recurring costs are the
same as the generators we already have.
04-02-2026
Generator Replacement
✔
331-Capital
04-02-2026
10-7-130-560-00
26
Public Safety Communications
130
$1,900,000.00
$0.00
$1,900,000.00
$0.00
$1,900,000.00
Non-Mandated
No
Replacing 12 position Radio Consoles at LCPSC 911. Eq uipment costs are $160K per position. 12 positions = $1.9M
04-02-2026
12 Position Radio Console Replacement
✔
330-Capital
04-02-2026
10-7-130-560-00
27
Public Safety Communications
130
$750,000.00
$0.00
$750,000.00
$0.00
$750,000.00
Non-Mandated
No
Upgrading to CAD Station Integration to support single unit dispatch for 24 hour stations. This is an automated dispatch solution that will
dispatch fire units seamlessly when the address and call type are set.
04-02-2026
Fire Dispatch CAD Integration
✔ ✔ ✔
332-Capital
04-02-2026
10-7-130-560-00
28
Roads & Bridges
10-7-202
$284,700.89
$0.00
$10,000.00
$284,700.89
$10,000.00
$294,700.89
Non-Mandated
No
New rubber tire loader to replace old track loader
12-10-2025
Caterpillar 930 Wheel Loader
✔
307-Capital
12-11-2025
One time cost for unit in Fund 11 at $284,701 and Act Ln # 11-7-202-560-00 - Equipment Capitalized
V
ehicle Mtn in Fund 10 in Road Mtn Budget at $10K and Act Ln # 10-7-202-590-00 - Maintenance Vehicles
29
Sheriff's Office
110
$0.00
$0.00
$0.00
$0.00
Non-Mandated
No
The parking lot at the main Sheriff’ s Office is in n eed of repair. We have numerous potholes, damaged sections, and cracking.
Additionally, as the size of our agency has grown, the number of spaces available are no longer sufficient. We believe that it is possible to
reconfigure several areas that will provide us with additional spaces. We have already enlisted the assistance of Public Works Director
Jeff Catoe to appropriate price and spec the project.
12-09-2025
Parking lot repair and modification
✔ ✔
304-Capital
12-11-2025
Tyler to price out floors - Tag Tyler - Special Projects Act Ln in Dept 110 (JP)
30