Planning Commission Workshop — Agenda Packet
Lancaster County · Lancaster County · Planning Commission · meeting of Feb 5, 2026 · Agenda packets
Open the original document More from Lancaster County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Planning Commission Members
District 1: Jason Cavalier
District 2: Yokima Cureton
District 3: Lynette Hinson
District 4: Judianna Tinklenberg
District 5: Shelly Richards, Chair
District 6: Sheila Hinson
District 7: Frances Liu
County Attorney
Ginny L. Merck-Dupont
Secretary to Planning Commission
Mara Mata
Planning Director
April Williams
February 5, 2026
5:00 PM
PLANNING COMMISSION
County Council Chambers, County Administration
Building, 101 North Main Street, Lancaster, SC 29720
WORKSHOP AGENDA
1. Call to Order Regular Meeting
2. New Business
a. CU-2025-2644: Nechyporuk/Fort Mill Hwy
Application by Volodymyr Nechyporuk and Thomas Frizzi for a Conditional Use
Permit for Unit B at 1081 Fort Mill Hwy (p/o TM # 0006-00-068.01) for a proposed
Minor Maintenance & Repair (Auto).
b. SD-2023-1869: Barberville Commercial
Application by Moody Group/Jan Ringeling on behalf of Barberville Developers LLC
and Martin Senior and Associates LLC for a Preliminary Plat for six parcels totaling
10.92 acres located at the northwest corner of Barberville Road and Fort Mill Highway
(TM #s 0006-00-057.00, 0006-00-058.00, 0006-00-058.01, 0006-00-058.02, 0006-00-
058.03), in order to create a multi-parcel commercial development with central shared
access.
c. NRN-2026-0011: New Road Names- February Group
February Group Submittal, new road names from E911 Addressing via Preliminary
Plats and Civil Plans, pursuant to Sec. 6.4.11 of the Unified Development Ordinance.
3. Other
a. Discussion: Proposals for CIP Projects
4. Adjournment
Recommendations made at this meeting are tentatively scheduled for consideration by County
Council in the following month. County Council agendas are posted online
at https://lancastercosc.portal.civicclerk.com/.
Anyone requiring special services to attend this meeting should contact 285-1565 at least 24
hours in advance of this meeting. Lancaster County Council agendas are posted at the Lancaster
County Administration Building and are available on the
Page 1 of 205
Website: https://www.lancastercountysc.gov/
Meetings are livestreamed and can be found by using the following link:
https://www.youtube.com/@LancasterCoSCGov/streams
Page 2 of 205
Agenda Item Summary
Ordinance # / Resolution # :
Contact Person / Sponsor:
Department:
Date Requested to Be on Agenda: 2/5/2026
Council Action Requested:
Refer to Council for one hearing
Strategic Plan Focus Alignment:
Points to Consider:
Funding and Liability Factors:
Recommendation:
Attachments:
1. GIS Location Map
2. CU Application
3. ConditionalUsePlan_639045883789854059
4. ConditionalUsePlanpage3_639045883789854059
5. Deed 1824_336
Page 3 of 205
Lancaster County, SC
Parcel ID 0006-00-068.01
Class Code Non Qualied
Commercial
Taxing
District
County
INDIAN LAND
Land Size 1.91 ACRES
Owner FORT MILL HIGHWAY
LLC
PO BOX 481905
CHARLOTTE, NC 28269
Physical
Address
1081 FORT MILL HWY
Assessed Value
Last 2 Sales
Date Price Reason Qual
8/22/2024 $1000000 TRUE
SALE
Q
6/5/2008 0 WILL Q
(Note: Not to be used on legal documents)
Date created: 1/29/2026
Last Data Uploaded: 1/29/2026 6:02:42 AM
168 ft
Overview
Legend
Parcels
Roads
Zoning Districts
AR
CITY
GB
HDR
HI
HSPRGS
IMX
INS
KER
LDR
LI
M
MDR
MH
MX
NB
OSP
PB
PDD
RB
RMX
RN
RR
RUB
UR
Page 4 of 205
Developed by
Page 5 of 205
I Lancaster Plannln1 Department
? South Carolina
County P.O. Box 1809, 101 N. Main Street, Lancaster, SC 29721
!11'!!!!!!!!!!!!!!111!!!!:~ Phone: 803.285.6005, plannlng@lancastercountysc.gov
- www.mylancastersc.org
CONDITIONAL USE APPLICATION
SUBMITTAL REQUIREMENTS
• Completed Application
• Signatures of Applicant and Property Owner
• All items noted on the Conditional Use Plan Checklist
• Fees associated with review
GENERAL INFORMATION
Property Address 1081 Fort Mill Highway Unit B
City Fort Mill State SC Zip 29707 Tax Parcel ID 000600068.01
Current Zoning G-eo ere...\ bu.!.t,r~~~ent Use o?Cia: I k.0:> ~ "-I:
Total Acres A, ) Surrounding Property Description Wowlc.J C<ea
Proposed Conditional Use auto repair services
CONTACT INFORMATION
Applicant Name Volodymyr Nechyporuk
Address 11711 Hawick Valley Ln
City Charlotte state NC Zip 28277 Phone 704-654-0735
Email willtanllc@gmail.com
Prope~Own~r Name Thomas Frizzi Address j 0'6::£> GI C,,,(h s-t:
City })~ StateN r. Zip 2-¥03.b Phone 980-721-1839
Email toptf21@gmail.com
January 2025 1
Page 6 of 205
APPLICATION CERTIFICATIONS
I hereby certify that I have read this appllcatlon and the Information supplied herein is true and correct
to the best of my knowledge. I agree to comply With all appllcable County ordinances and state laws
related to the use and development of the land. I further certify that I am the property owner, or
his/her authorized agent, or the subject property. I understand that falsifying any Information herein
may result in reje~hls request. -f J.../ 'I/ et. >
Applicant Date
Property Owner(s) Date
Additional Owner (s)
Attach owner's notarized written authorization with property information if the applicant is not the
owner.
SCHEDULE/PROCESS
1. Submit Application
• The deadline for this application is at least 45 days prior to the Planning Commission meeting,
held every third Tuesday of the month.
• Once an application is submitted, it is placed on the Planning Commission agenda for the
following month.
• An application withdrawal should be made in writing and received prior to public notice in
order to receive a refund.
• Conditional Use Application Fee -$500.00
2. Planning Commission
• Conducts a public hearing on the application to receive input from Lancaster County citizens,
applicant, and other interested parties.
• Reviews the application to ensure it is consistent with the Lancaster County Unified
Development Ordinance, Comprehensive Plan, and all adopted County plans.
• Makes a recommendation to the County Council.
3. County Council
• Approves, denies, or submits application to the Planning Commission for further study.
• Action requires a resolution for approval.
• Subsequent to County Council action, notice of action will be provided to the applicant,
January 2025 3
Page 7 of 205
SITE OF
REPAIRS
EXISTING LANDSCAPE ISLANDS.
NO CHANGES REQUIRED
EXISTING HARD SURFACE UNMARKED
PARKING SPACES TO RECEIVE NEW WHEEL
STOPS
EXISTING HARD SURFACE DRIVE NO CHANGES REQUIRED
This drawing and prints are the property of Reddric k Architecture.
The reproduction, copying or other use of this draw ing without
written consent from Reddrick Architecture is not permitted, except
as permitted by the copyright or architectural work s by the
US Copy Right Act.
Copyright
Architectural Seals
Project Name
Drawing Credits
draftsman
checker
architect
Revisions
Sheet Title
Editable electronic files are available for an addi tional costs. Please
contact the architect for those files. Editable ele ctronic files are
available for reference only and discrepancy betwee n sealed drawings
and editable electronic files shall be reported to the owner and
architect for resolution.
Digital Plans
James Reddrick Architect
www.jr-architect.online
980.254.5348 james@jr-architect.online
1333 Rising Oak Dr, Charlotte, NC, 28206
LLC
5/14/25
5/14/2025 10:12:51 PM
A0.1
Author
Warehouse Repairs
2025-1081
Cover Sheet
Author
Author
James Reddrick Architect
www.jr-architect.online
james@jr-architect.online
980.254.5348
LLC
ARCHITECTURE
Sheet List
Sheet Number Sheet Name
Current
Revision
Designer
A0.1 Cover Sheet 2
A1.0 Code Summary 2
A1.1 Site Plan and Life Safety Plan 2
Grand total: 3
WAREHOUSE REPAIRS
N
12" = 1'-0" A0.1
1 Vicnity Map
N
12" = 1'-0" A0.1
3 Existing Landscaping Island
1
RENDERING IS FOR ILLUSTRATION OF THE EXISTING CONDITIONS ON THE SITE. ALL
CONDITIONS ARE EXISTING. EXCEPT AS NOTED IN RED. THE GREEN AREAS ARE EXISTING
LANDSCAPING. NO CHANGES ARE REQUIRED. THE WHITE IS EXISTING HARD SURFACE. NO
CHANGES ARE REQUIRED. SEE OTHER SHEETS FOR FURTHER DETAILS
1
2
No. Description Date
0 Issue for Construction 3/25/25
1 Permit Revisions 4/19/25
2 Permit Revisions 5/14/25
Page 8 of 205
4'-0" MIN TO B.O. BRAILLE
60" MAX TO B.O. HIGHEST
TACTILE CHARACTER
9"
4'-0" MIN TO B.O. BRAILLE
60" MAX TO B.O. HIGHEST
TACTILE CHARACTER
EXIT
ACCESSIBILITY
TACTILE EXIT SIGN
RESTROOM SIGN
ALL BUILDINGS ENTRANCES THAT ARE ACCESSIBLE TO AND USABLE BY PHYSICALLY HANDICAPPED PERSONS
SHALL BE IDENTIFIED WITH AT LEAST ONE STANDARD SIGN AND WITH ADDITIONAL DIRECTIONAL SIGNS, AS
REQUIRED, TO BE VISIBLE TO PERSONS ALONG APPROACHING PEDESTRIAN WAYS.
ALL SIGNAGE SHALL CONFORM WITH ADA ACCESSIBILITY GUIDELINES:
1. LETTERS & NUMERALS MUST BE RAISED 1__
32 " FROM SIGN SURFACE.
2. CHARACTER HEIGHT MUST BE AT LEAST 5/8" BUT NOT EXCEED 2".
3. TYPE STYLE FOR LETTERS AND NUMBERS SHALL BE SANS SERIF OR SIMPLE SERIF.
4. WORDS AND NUMBERS MUST BE CONVERTED INTO GRADE 2 BRAILLE, AND BE APPLIED TO
SIGN.
5. PICTOGRAMS SHALL BE ACCOMPANIED BY THE EQUIVALENT VERBAL DESCRIPTION
PLACED DIRECTLY BELOW PICTOGRAM.
6. SEE SHEET G-004 FOR MORE DETAILED SIGNAGE INFORMATION.
LEVER HANDLE
CRYSTAL ICE, FROSTED ACRYLIC ADA SIGN,
9"x9" MOUNTED ON 1/16" BRUSHED
ALUM-LOOK ACRYLIC, 1/32" RAISED BLACK
LETTERING
CLEAR BRAILLE STAINLESS STEEL
STANDOFFS
G.C. TO INSTALL AS REQ'D BY GOV. CODES/
COORDINATE WITH TENANT FOR ANY
ADDITIONAL SIGNS FROM EDGE OF DOOR
FRAME TO CL OF SIGN
1 1_
4
" TO 1 1/2" 11/2"
ANCHOR PLATES ARE 12 GAUGE STEEL AND 6" WIDE. (LENGTH VARIES). FURNISHED WITH STAINLESS STEEL MACHINE SCREWS TO ACCOMMODATE WALL
FINISHES TO 1 1/2" THICK. ANCHOR PLATES SECURED TO STUDS BY WELDING, WIRING OR SELF THREADING SCREWS.
GRAB BARS
LOCATE GRAB BARS ON EACH SIDE, OR ONE SIDE AND THE BACK, OF THE WATER CLOSET, 33 INCHES ABOVE AND PARALLEL TO THE FLOOR. GRAB BARS AT THE
SIDE ARE TO BE AT LEAST 42 INCHES LONG WITH THE FRONT END POSITIONED 12 INCHES IN FRONT OF THE WATER CLOSET. GRAB BARS AT THE BACK CAN NOT
BE LESS THAN 36 INCHES LONG.
THE DIAMETER OR WIDTH OF THE GRIPPING SURFACE IS REQUIRED TO BE 1 1/4 TO 1 1/2 INCHES, OR THE SHAPE IS TO PROVIDE AN EQUIVALENT GRIPPING
SURFACE. IF GRAB BARS ARE MOUNTED ADJACENT TO A WALL, THE SPACE BETWEEN THE WALL AND THE GRAB BARS IS TO BE 1 1/2 INCHES.
GRAB BARS SHALL NOT ROTATE WITHIN THEIR FITTINGS.
GRAB BARS AND ANY SURFACE ADJACENT TO THEM CAN NOT HAVE ANY SHARP OR ABRASIVE ELEMENTS. EDGES ARE TO
HAVE A MINIMUM RADIUS OF 1/8 INCH.
BENDING STRESS IN A GRAB BAR OR SEAT INDUCED BY THE MAX. BENDING MOMENT FROM THE APPLICATION OF A 250 LB.
POINT LOAD SHALL BE LESS THAN THE ALLOWABLE STRESS FOR THE MATERIAL OF THE GRAB BAR OR SEAT.
SHEAR STRESS INDUCED IN A GRAB BAR BY THE APPLICATION OF 250 LBF POINT LOAD SHALL BE LESS THAN THE ALLOWABLE
SHEAR STRESS FOR THE MOUNTING BRACKET OR OTHER SUPPORT IS CONSIDERED TO BE FULLY RESTRAINED, THEN DIRECT
AND TORSIONAL SHEAR STRESSES SHALL NOT EXCEED THE ALLOWABLE SEAR STRESS.
SHEAR FORCE INDUCED IN FASTENER OR MOUNTING DEVICES FROM THE APPLICATION OF A 250 LB. POINT LOAD SHALL BE
LESS THAN THE ALLOWABLE LATERAL LOAD OF EITHER FASTENER OR MOUNTING DEVICE OR THE SUPPORTING STRUCTURE,
WHICHEVER HAS THE SMALLER ALLOWABLE LOAD.
TENSILE FORCE INDUCED IN A FASTENER BY A DIRECT TENSION FORCE OF A 250 LB. POINT LOAD, PLUS THE MAX. MOMENT
FROM THE APPLICATION OF A 250 LB. POINT LOAD, SHALL BE LESS THAN THE ALLOWABLE WITHDRAWAL LOAD BETWEEN THE
FASTENER AND SUPPORTING STRUCTURE.
GRAB BAR AND ANY WALL OR OTHER SURFACE ADJACENT TO IT SHALL BE FREE OF ANY SHARP OR ABRASIVE ELEMENTS.
EDGES SHALL HAVE A MINIMUM RADIUS OF 1/8".
CORRESPONDING
GRADE II BRAILLE
EXISTING BRACKET MOUNTED
FIRE EXTINGUISHER TO BE
2A:10BC EXTINGUISHER WITH 5LB
CAPACITY.
INSTALLED AT EACH EXIT DOOR.
4' - 0"
GRAB BARS
SOAP
DISPENSER
1' - 6"
3' - 0"
3' - 0" 0' - 6 1/2"
2' - 10"
3' - 4" 3' - 0"
3' - 6"
3' - 7"
MIRROR
TOILET
TISSUE
DISPENSER
GRAB BARS
1' - 5 1/4"
4' - 0" 0' - 6"
3' - 5"
3' - 6 1/4" 1' - 6"
1' - 6"
3' - 6"
TOP OF GRAB BAR
3' - 0"
PROVIDE GRAB BARS
FOR WATER CLOSETS
THAT WERE REPLACED
REPLACEMENT OF SINK DONE IN A MANNER THAT
MAINTAINED THE LEVEL OF ACCESSIBLITY PER SOUTH
CAROLINA EXISTING BUILDING CODE SECTION 401.2;
THUS SINK DOES NOT HAVE TO COMPLY WITH
CURRENT ACCESSIBILITY REQUIREMENTS
SOAP DISPENSER
PAPER TOWEL DISPENSER
WASTE RECEPTACLE
18"
VERTICAL
GRAB BAR
42" GRAB BAR
36" GRAB BAR
TOILET
TISSUE
DISPENSER
ACCESSIBLE RESTROOM SIGN
MIRROR
PT DISPENSOR
(PTD) AND
WASTE
RECEPTACLE
(WR)
4' - 0"
This drawing and prints are the property of Reddric k Architecture.
The reproduction, copying or other use of this draw ing without
written consent from Reddrick Architecture is not permitted, except
as permitted by the copyright or architectural work s by the
US Copy Right Act.
Copyright
Architectural Seals
Project Name
Drawing Credits
draftsman
checker
architect
Revisions
Sheet Title
Editable electronic files are available for an addi tional costs. Please
contact the architect for those files. Editable ele ctronic files are
available for reference only and discrepancy betwee n sealed drawings
and editable electronic files shall be reported to the owner and
architect for resolution.
Digital Plans
James Reddrick Architect
www.jr-architect.online
980.254.5348 james@jr-architect.online
1333 Rising Oak Dr, Charlotte, NC, 28206
LLC
5/14/25
5/14/2025 10:12:51 PM
A1.0
Author
Warehouse Repairs
2025-1081
Code Summary
Author
Author
.
_________
_________
_________ psf
_________ psf
_________ psf
_________
_________ mph (ASCE-7)
DESIGN LOADS:
Importance Factors:
Ground Snow Load:
Live Loads:
Wind Load:
Exposure Category:
Ultimate Wind Speed:
_________ psf
Snow
Seismic
Mezzanine
Roof
Floor
ALLOWABLE
Building Height in Stories (T504.4)
Building Height in Feet (T504.3)
TELEPHONE # NAME LICENSE #
2021 SOUTH CAROLINA BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS
S1Ss _________ %g
Dual w/Special Moment Frame
Inverted Pendulum
_________ %g
Dual w/Intermediate R/C or Special Steel
Site Classification: (ASCE 7)
Risk Category: (Table 1604.5)
Analysis Procedure:
Basic structural system (check one)
LATERAL DESIGN CONTROL:
SOIL BEARING CAPACITIES:
Spectral Response Acceleration:
Moment Frame
Building Frame
Bearing Wall
Architectural, Mechanical, Components anchored?
Simplified Equivalent Lateral Force Dynami c
TOTAL # # OF ACCESSIBLE SPACES PROVIDED
ACCESSIBLE
PROVIDED
VAN SPACES WITH REGULAR WITH
5' ACCESS
AISLE
PROVIDED
LOT OR PARKING
AREA
ZONED GB
TOTAL # OF PARKING SPACES
REQUIRED
DETAIL #
AND
SHEET # REQ'D
FIRE
SEPARATION
DISTANCE
(FEET)
RATING**
Structural frame,
including columns,
girders, and trusses
BUILDING ELEMENT
Exterior
East
North Bearing walls
Interior
Nonbearing
walls and
partitions
(see section
601-602 if
rated)
South
West
Smoke Partition
Party/ Fire Wall Separation
Corridor Separation
Shaft enclosures - Other
Shaft enclosures - Exit
Tenant/ Dwelling Unit/ Sleeping Unit Separation
Smoke Barrier Separation
Floor construction Including supporting beams
and joists
A-5A-4A-3A-2A-1
Factory
FIRM DESIGNER
Architectural
Electrical
Civil
Fire Alarm
Mechanical
Plumbing
Structural
Retaining Walls >5' High
Sprinkler-Standpipe
Primary Occupancy Classification(s):
Business
Assembly
Educational
CONTACT:
The required type of construction for the building shall be determined by applying the height and area limitations for each of the applicable
occupancies to the entire building. The most restr ictive type of construction, so determined, shall a pply to the entire building.
Separated use (508.4)
See below for area calculations for each story, the area of the occupancy shall be such that the sum o f the ratios of the actual floor area of
each use divided by the allowable floor area for ea ch use shall not exceed 1.
Non-Separated Use (508.3.)
Actual Area of Occupancy A
Allowable Area of Occupancy A
________________________
a. Perimeter which fronts a public way or open space having 20 feet minimum width = _______ (F)
b. Total Building Parameter = ______________ (P)
c. Ratio (F/P) = __________ (F/P)
d. W = Minimum width of public way = ________________ (W)
e. Percent of frontage increase I = 100[F/P - 0.25] X w/30 = ________ (%)
Unlimited area applicable under conditions of Sections 507.
Frontage area increases from Section 506.3 are computed thus:
2
1
STORY NO DESCRIPTION
AND USE
Mixed Occupancy No
f
Actual Area of Occupancy B
Allowable Area of Occupancy B
_____________________
(A)
BLDG AREA
PER STORY
(ACTUAL)
+
+
+
< 1
< 1.00 ______
Exception: _______ Separation: _____ Hr. Yes
0.97 =
Maximum Building Area=total number of stories in the building x D (506.2). Maximum of 3.
3
The Maximum area of open parking garage shall be permitted to comply with 406.5.4.
4
Incidental use Separation
DCB
Historical Data Presumptive Field Test
ASEISMIC DESIGN CATEGORY:
PARKING:
2021 SC BUILDING CODE
Shell/Core- Contact the local inspection jurisdiction for possible
additional procedures and requirements
First time interior completion (upfit)
New Building Addition
Constructed: (date)
III-B
III-A
Wet III
NFPA 13D
II-A
II I Class: Yes
Yes NFPA 13
II-B
NFPA 13R
Yes
Dry
I-AConstruction Type:
(Check all that Apply)
No
No Sprinklers:
I-B
No
Fire District:
Standpipes:
IV
V-B
V-A
PARTIAL
Emergency Lighting:
Carbon Monoxide Detection:
Smoke Detection Systems:
Exit Signs:
Fire Alarm:
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
Partial
0
0
0
0
0
0
0
0
0
0
0
0
(980) 254-5348 James Reddrick James Reddrick Architect LLC
10'< X >30'
NA
N/A
N/A
N/A
N/A
N/A
-
-
-
-
-
-
-
-
- -
- psf (Net)
- psf
N/A
N/A
N/A
8135
(B)
TABLE
506.2
AREA
4
(C)
AREA FOR
FRONTAGE
INCREASE
1,5
(D)
ALLOWABLE AREA PER
STORY OR UNLIMITED
2,3
SHOWN ON PLANS CODE REFERENCE
PROVIDED
W/ ___________*
REDUCTION
DESIGN #
FOR
RATED
ASSEMBLY
DESIGN # FOR
RATED
PENETRATION
DESIGN #
FOR
RATED
JOINTS
Roof construction Including supporting
beams and joists
*Indicate section number permitting reduction.
Field Test (provide copy of test report as a refere nced document):
Presumptive Bearing capacity
Pile size, type, and capacity
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
IV III II I
Data Source:
DCBA E F
No Yes
Wind Earthquake
(Reproduce the following data on the building plans sheet 1 or 2)
E-MAIL
James@jr-architect.online
Yes No Flood Hazard Area:
ALLOWABLE AREA
I-4
54
I-3
2 3
I-2
1
I-1Institutional
I-3 Condition
B
E
F-1 Moderate F-2 Low
H-1 Detonate H-2 Deflagrate Hazardous H-3 Combust H-4 Health H-5 HPM
MMercantile
R-4R-3R-2R-1Residential
S-2 Low S-1 Moderate Storage High-piled
Enclosed Parking Garage Repair Garage Open
UUtility and
Miscellaneaous
Accessory Occupancy Classifications
FIRE PROTECTION REQUIREMENTS
N/A
PERCENTAGE OF WALL OPENING CALCULATIONS
DEGREE OF OPENINGS
PROTECTION (TABLE 705.8)
ALLOWABLE AREA
(%)
ACTUAL SHOWN ON PLANS
(%)
FIRE SEPARATION DISTANCE
(FEET) FROM PROPERTY LINES
LIFE SAFETY SYSTEM REQUIREMENTS
LIFE SAFETY PLAN REQUIREMENTS
Fire and/ or smoke rated wall locations (Chapter 7)
Assumed and real property line locations (if not on the site plan)
Exterior wall opening area with respect to distance to assumed property lines (705.8)
Occupancy Use for each area as it relates to occupa nt load calculation (Table 1004.1.2)
Occupant loads for each area
Exit access travel distances (1017)
Common path of travel distances (Tables 1006.2.1 & 1006.3.2(1))
Dead end lengths (1020.4)
Clear exit widths for each exit door
Maximum calculated occupant load capacity each exit door can accommodate based on egress width (1005.3)
Actual occupant load for each exit door
A separate schematic plan indication where fire rated floor/ceiling and/or roof structure is provided for purposes of occupancy separation
Location of doors with panic hardware (1010.1.10)
Location of doors with delayed egress locks and the amount of delay (1010.1.9.7)
Location of doors with electromagnetic egress locks (1010.1.9.9)
Location of doors equipped with hold-open devices
Location of emergency escape windows (1030)
The square footage of each fire area (202)
The square footage of each smoke compartment (407.5 )
Note any code exceptions or table notes that may have ben utilized regarding the items above
ACCESSIBLE DWELLING UNITS (SECTION 1107) NOT APPLICABLE
TOTAL
UNITS
ACCESSIBLE
UNITS
REQUIRED
ACCESSIBLE
UNITS
PROVIDED
TYPE A
UNITS
REQUIRED
TYPE A
UNITS
PROVIDED
TYPE B
UNITS
REQUIRED
TYPE B
UNITS
PROVIDED
TOTAL ACCESSIBLE
UNITS PROVIDED
ACCESSIBLE PARKING (SECTION 1106)
132" ACCESS
AISLE
8' ACCESS
AISLE
Walls X>30
Other
Renovation
Phased Construction - Shell/Core- Contact the local inspection
jurisdiction for possible additoinal procedures and requirements
2021 SC EXISTING
BUILDING CODE
Prescriptive Repair Chapter 14
Level I Level II Level III
Historic Property Change of Use
RISK CATEGORY (T1604.5) Current: I II
Proposed:
III IV
I II III IV
Special Inspections: Yes (Contact the local inspection jurisdiction fo r additional procedures and requirements) No
BASIC BUILDING DATA
GROSS BUILDING AREA TABLE
BUSINESS (LESS THAN 10% OF FLOOR AREA)
Incidental Uses (T509) N/A
Special Uses (Ch 4- List Code) N/A
Special Provisions (Ch 5 - List Code) N/A
Frontage increase is basedon the unsprinklered area value in T506.2
5
ALLOWABLE HEIGHT
2
3
Provide code reference if the "Shown on Plans" quantity is not based on T504.3 or 504.4.
1
The maximum height of air traffic control towers must comply with T412.3.1.
2
The maximum height of open parking garages must comply with T406.5.4.
3
Floor Ceiling/Roof Ceiling Assembly
Columns Supporting Floors/ Roof
Occupancy/ Fire Barrier Separation
ACCESSIBLE REGULAR
DRINKING FOUNTAINS LAVATORIES URINALS OCCUPANCY
USE GROUP
AND/OR SPACE
DESIGNATION
WATERCLOSETS
M
Existing
PLUMBING FIXTURE REQUIREMENTS (T2902.1)
SHOWER/
TUBS
Special Approvals (Local Jurisdiction, Department of Insurance. OSC, DPI, DHHS, ICC, etc.,describe below)
SPECIAL APPROVALS (If applicable to project)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
ENERGY REQUIREMENTS:
The following data shall be considered minimum and a ny special attribute required to meet the energy code shall also be provided. Each Designer
shall furnish the required portions of the project information for the plan data sheet. If performance method, state the annual energy cost for the
standard reference design vs annual energy cost for the proposed design.
THERMAL ENVELOPE: (Prescriptive method only)
Roof/ceiling Assembly(each assembly)
Description of assembly
U-Value of total assembly
R-Value of insulation
Skylights in each assembly
U-Value of skylight
Total percentage of skylights in each assembly:
Exterior Walls (each assembly)
Description of assembly
U-Value of total assembly
R-Value of insulation
Openings (windows or doors with glazing)
U-Value of assembly
Solar heat gain coefficient:
Projection factor
Low E required, if applicable
Door U-Values
Walls below grade (each assembly)
Description of assembly
U-Value of total assembly
R-Value of insulation
Floors over unconditioned space (each assembly)
Description of assembly
U-Value of total assembly
R-Value of insulation
Floors slab on grade
Description of assembly
U-Value of total assembly
R-Value of insulation
Horizontal/vertical requirement
Slab heated
Climate Zone:
Existing building envelope complies with code: Yes (The remainder of this section is not applicab le) No
Exempt Building: Yes (Provide code or stautory reference) See Note 1 Below. No
4A 3A 5A
Method of Compliance: Energy Code ASHRAE 90.1 (2013) Other
Performance
Prescriptive
Performance
Prescriptive
-
-
(I ) S
(I ) E
2,000
N/A
Exterior
East
North
Interior
South
West
(EXCEPT 1 AND 2 FAMILY DWELLINGS AND TOWNHOUSES)
N/A N/A N/A
Owner or Authorized Agent:
Code Enforcement Jurisdiction:
Owned By:
Name of Project:
Address:
County City
City/County Private State
State
Warehouse Repairs
1081 Fort Mill Highway, Fort Mill, SC 29707
(980) 254-5348
Buildings descriptions and scope of work:
JAMES REDDRICK
Lancaster
james@jr-architect.online
PROJECT INFORMATION:
Phone # E-Mail
N/A N/A N/A
N/A N/A N/A N/A
Repaired: (date)
Current Occuapncy(s) Ch. 3
Proposed Occuapncy(s) Ch. 3
DATA
1978
2024
S-2, S-1, F-2
EXISTING (SQ. FT.)
FLOOR
-
-
-
22,102
NEW (SQ. FT.)
Warehouse
-
-
-
0
0
0
0
Warehouse 14,696 (S-2) low hazard 26,000 N/A 26,000
55'-0"
3
12'-6"
1 (EXISTING)
T504.3
T504.4
STRUCTURAL DESIGN
(EXISTING-NO CHANGES REQUIRED )
N/A SC
The existing warehouse repair work was performed prior to issue of permit. The AHJ stopped work and requested the
owner hire an architect. The owner hired JR-Architect. JR-Architect evaluated the facility and determined the repair
work included replacing broken toilet fixtures, replacing paint, replacing broken doors, and replacing floor finishes. The
repair work included Suites A, B, C, D, and E. The facility was evaluated for code compliance and the architectural
drawings show compliance for permitting purposes and documentation. Suite D already has permit from 2010 and thus
no work required in Suite D.
N/A
N/A N/A N/A N/A N/A
PER ZONING 18 1 3
- 1 10
MECHANICAL SYSTEMS, SERVICE SYSTEMS AND EQUIPMENT
Winter dry bulb -°F
Thermal Zone --
Summer dry/wet bulb -°F DB / -°F WB
Winter dry bulb -°F
Interior Design Conditions
Summer dry bulb -°F
Relative Humidity -%
Outside Air Heating Load - MBH
Outside Air Cooling Load - MBH
Mechanical Space Conditioning System
Description of Unit -
Heating Efficiency -
Cooling Efficiency -
Unitary
Heat output of Unit -
Cooling output of Unit -
Size category.. If oversized state reason. N/A
Boiler
Size category. If oversized state reason. N/A
Chiller
List Equipment Efficiencies .
Performance Prescriptive
Method of Compliance:
ELECTRICAL SYSTEM AND EQUIPMENT
Lighting Schedule (each fixture type)
Number of Lamps in fixture -
Ballast type used in the fixture -
Number of Ballasts in fixture -
Total wattage per fixture -
Total interior wattage specified vs allowed
Lamp type required in fixture -
Energy Code:
Performance Prescriptive ASHRAE 90.1:
Additional Required Prescreptive Compliance
C406.2 More Efficient HVAC Equipment Performance
C406.3 Reduced Lighting Power Density
C406.4 Enhanced Digital Lighting Controls
C406.5 On-Site Renewable Energy
C406.6 Dedicated Outdoor Air System
C406.7 Reduced Energy Use in Service Water Heating
N/A
REPAIR (SQ. FT.)
Replace doors, floors, paint, toilets
0
0
0
0 0
UP, Sprinklered No limit
2 -
F Unisex
New
Required
- 7 1
- 10- 5 0
M F Unisex
- - 7
- - 5
(EXISTING-NO CHANGES REQUIRED)
Note 1: 2018 NC Existing building code section 811. 1 does not require
existing building envelopes to comply with the ener gy code
(EXISTING-NO CHANGES REQUIRED)
(EXISTING-NO CHANGES REQUIRED)
(EXISTING-NO CHANGES REQUIRED)
1. NO CHANGES ARE REQUIRED TO EXISTING PLUMBING FIXTURE COUNT.
2. EACH TENANT SPACE HAS LESS THAN 15 PEOPLE THUS DR INKING FOUNTAINS ARE NOT REQUIRED PER SC PLUMBING
CODE SECTION 410.2. HOWEVER SUITE D HAS MORE THAN 15 PEOPLE BUT SUITE HAS AN EXISTING REFRIGERATOR
AND EXISTING BREAK ROOM SINK FOR OCCUPANTS TO DRINK WATER
N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
10'< X >30'
10'< X >30'
0 0
0 N/A
0 0
N/A
N/A
N/A
0
N/A
48
Assembly
(EXISTING-NO CHANGES REQUIRED)
(EXISTING-NO CHANGES REQUIRED)
(EXISTING- NO CHANGES REQUIRED)
1
10'< X >30'
N/A
N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A
S-2, S-1, F-2
2*
_____________________ +14,696 (S-2)
26,000 (S-2)
2,512 (S-1)
17,500 (S-1)
4,898 (F-2)
18,000 (F-2)
Warehouse (SUITE A) 2,512 (S-1) mod hazard 17,500 N/A 17,500
* S-1 adjacent to S-2 is 2hr rating. However F-2 adjacent to S-2 does not require a fire rating.
Warehouse 4,898 (F-2) low hazard 18,000 N/A 18,000
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
1/4" = 1'-0" A1.0
1 Accessibility Restroom and Exit Sign
6" = 1'-0" A1.0
2 Tactile Exit Sign
3/8" = 1'-0" A1.0
3 Fire Extinguisher Cabinet
3/8" = 1'-0" A1.0
4 Water Closet Front Elevation
3/8" = 1'-0" A1.0
5 Water Closet Side Elevation
3/8" = 1'-0" A1.0
A1.1
6 Typical Accessible Restroom
3/8" = 1'-0" A1.0
7 Paper Towel Dispenser
3" = 1'-0" A1.0
8 Grab Bar Details
12" = 1'-0" A1.0
9 Accessible Parking Standard
1
1
1
2
2
No. Description Date
0 Issue for Construction 3/25/25
1 Permit Revisions 4/19/25
2 Permit Revisions 5/14/25
Page 9 of 205
MIDLAND CART
COMPANY
A100
OFFICE
A101
BATH
A102
VACANT
STORAGE
B100
OFFICE
B101
BATH
B102
VACANT
STORAGE
C100
OFFICE
C101
BATH
C102
OFFICE
D102
OFFICE
D103
BREAK
D104
BATH
D105
BATH
D106
BATH
D107
TOP TURF
E100
OFFICE
E101
BATH
E102
JAN
E103
SHOWER
E104
SECURE
STORAGE
E105
Room Legend
BATH
BREAK
Closet
JAN
MIDLAND CART COMPANY
OFFICE
SECURE STORAGE
SHOWER
SOUND DESIGN
SOUND DESIGN STORAGE
TOP TURF
VACANT STORAGE
FORT MILL HIGHWAY
49' - 9 1/2" RECENTLY NEW TENANT
50' - 7"
97' - 0" EXISTING TENANT SINCE 2010 96' - 6 1/2" EXISTING TENANT SINCE 2010
83' - 0" RECENTLY NEW TENANT
60' - 3"
Closet
E106
OFFICE
D101
SOUND DESIGN
STORAGE
D100A
SOUND DESIGN
D100B
S-2 OCCUPANCY
98' - 0"
EXISTING WALL TO BE
COVERED WITH NEW
2HR FIRE BARRIER
SHAFT WALL PER UL
U417. CONTINUITY AT
HEAD AND JAMB OF
WALL SHALL BE EQUAL
TO UL DESIGN CJ -D-004
PROVIDE 36" REAR GRAB BAR
PROVIDE 42" SIDE GRAB BAR
PROVIDE 18" VERTICAL GRAB BAR AT WATER CLOSETS
PROVIDE 36" REAR GRAB BAR
PROVIDE 42" SIDE GRAB BAR
PROVIDE 18" VERTICAL GRAB BAR
AT WATER CLOSET
SEE
ACCESSIBLE
NOTE 4&5
RIGID FIBERLGASS SHEETS ARE CLASS 1 COMMODITY. IT IS STORED IN
PILES ON 4 ’X4 ’ PALLETS.
NON -COMBUSTIBLE STORAGE ITEMS ONLY RIGID FIBERLGASS SHEETS LIGHT MANUFACTURING
EXISTING ELECTRIC
CART STORAGE.
CHARGING STATION IS
NOT REQUIRED OR
PROVIDED
SOUND DESIGN IS EXISTING TENANT SPACE WITH PERMIT. NO CHANGES
REQUIRED. SPACE SHOWN FOR DOCUMENTATION ONLY.
DOCK
EXISTING LANDSCAPING TO
REMAIN NO CHANGES
REQUIRED
SIDE YARD SETBACK
15' - 0"
SIDE YARD SETBACK
15' - 0"
FRONT YARD SETBACK
50' - 0"
REAR YARD SETBACK
15' - 0" EXISTING BUILDING ENCROACHES INTO
SETBACK. POSSIBLY BUILT PRIOR TO THE
ADOPTION OF THE CURRENT ZONING
ORDINANCE; THUS IT IS LEGAL NON -
CONFORMING AND GRANDFATHERED TO
ALLOW ENCROACHMENT INTO SETBACK.
BUILDING BUILT IN 1978.
EXISTING
FORK LIFT
DRIVE APRON
FOR COILING
DOORS
EXISTING BUILDING ENCROACHES INTO
SETBACK. POSSIBLY BUILT PRIOR TO THE
ADOPTION OF THE CURRENT ZONING
ORDINANCE; THUS IT IS LEGAL NON -
CONFORMING AND GRANDFATHERED TO
ALLOW ENCROACHMENT INTO SETBACK.
BUILDING BUILT IN 1978.
A1.0
6
FIRE EXTINGUISHER
FIRE EXTINGUISHER
FIRE EXTINGUISHER
FIRE EXTINGUISHER
FIRE EXTINGUISHER
FIRE EXTINGUISHER
EXIT DISTANCE IS 70FT
OCCUPANT LOAD AT DOOR IS 5 PEOPLE:
THE DOOR CAPACITY IS 360 PEOPLE
THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH
THE EXISTING DOOR WIDTH IS 72"
AREA IS S -1 OCCUPANCY.
OCCUPANT LOAD CALCULATION
2512 SQFT / 500 SQFT PERSON = 5 PERSON
AREA IS S -2 OCCUPANCY.
OCCUPANT LOAD CALCULATION
4949 SQFT / 500 SQFT PERSON = 10 PERSON
EXIT DISTANCE IS 90 FT
OCCUPANT LOAD AT DOOR IS 5 PEOPLE:
THE DOOR CAPACITY IS 170 PEOPLE
THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH
THE EXISTING DOOR WIDTH IS 36"
EXIT DISTANCE IS 90 FT
OCCUPANT LOAD AT DOOR IS 5 PEOPLE:
THE DOOR CAPACITY IS 170 PEOPLE
THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH
THE EXISTING DOOR WIDTH IS 36"
AREA IS F -2 OCCUPANCY.
OCCUPANT LOAD CALCULATION
10 PERSON ACTUAL OCCUPANT LOAD (1004.5 EXCEPTION) 4,906 SQFT
EXIT DISTANCE IS 80 FT
OCCUPANT LOAD AT EACH DOOR IS 5 PEOPLE:
THE DOOR CAPACITY IS 170 PEOPLE
THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH
THE EXISTING DOOR WIDTH IS 36"
AREA IS S -2 OCCUPANCY.
OCCUPANT LOAD CALCULATION
4848 SQFT / 500 SQFT PERSON = 10 PERSON
EXIT DISTANCE IS 100FT
OCCUPANT LOAD AT DOOR IS 5 PEOPLE:
THE DOOR CAPACITY IS 170 PEOPLE
THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH
THE EXISTING DOOR WIDTH IS 36"
EXIT DISTANCE IS 45 FT
OCCUPANT LOAD AT DOOR IS 5 PEOPLE:
THE DOOR CAPACITY IS 170 PEOPLE
THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH
THE EXISTING DOOR WIDTH IS 36"
AREA IS S -2 OCCUPANCY.
OCCUPANT LOAD CALCULATION
5000 SQFT / 500 SQFT PERSON = 10 PERSON
EXIT DISTANCE IS 67 FT
OCCUPANT LOAD AT DOOR IS 5 PEOPLE:
THE DOOR CAPACITY IS 170 PEOPLE
THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH
THE EXISTING DOOR WIDTH IS 36"
EXIT DISTANCE IS 60 FT
OCCUPANT LOAD AT DOOR IS 5 PEOPLE:
THE DOOR CAPACITY IS 170 PEOPLE
THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH
THE EXISTING DOOR WIDTH IS 36"
7' - 6"
OUTDOOR STORAGE OF PROPANE TANKS
IN AN APPROVED STORAGE CABINET.
SCREENED BY 6FFT TALL WOOD FENCE.
EXISTING
LANDSCAPING
ISLAND
5FT WALK WAY EXISTING COMPACTED HARD SURFACE TO BE TREATED WITH "GRAVEL LOK" . SEE ACCESSIBLE NOTE 1
8' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0"
EXISTING LANDSCAPING ISLAND
19' - 0" 19' - 0" 23' - 0 1/2" 19' - 0"
1' - 9 1/2"
6' - 6"
TYPICAL WHEEL
STOP LOCATION.
SEE WHEEL
STOP NOTE 1&2
SEE
ACCESSIBLE
NOTE 2&3
EXISTING LANDSCAPING TO
REMAIN NO CHANGES
REQUIRED
EXISTING LANDSCAPING
TO REMAIN NO
CHANGES REQUIRED
EXISTING LANDSCAPING TO
REMAIN NO CHANGES
REQUIRED
EXISTING HARD SURFACE TO
REMAIN NO CHANGES
REQUIRED
EXISTING HARD SURFACE TO
REMAIN NO CHANGES
REQUIRED
30' - 0"
32' - 0"
EXISTING
SEPTIC
EXISTING SEPTIC
EXISTING SEPTIC
12' - 0" 10' - 0"
CANOPY
18' - 0"
5' - 0"
5' - 0"
23' - 8 3/4"
EXISTING DUMPSTER 6' HEIGHT
6FT OPAQUE WOOD
FENCE WITH WOOD GATE
DOORS
6FT HIGH
WOOD
FENCE
20' - 0" 11' - 10 1/2"
UNMARKED HARD SURFACE
PARKING SPACES TO GET
NEW WHEEL STOPS,
TYPICAL
SEE
ACCESSIBLE
NOTE 4&5
23' - 2 3/4"
UNMARKED HARD
SURFACE PARKING
SPACES TO GET NEW
WHEEL STOPS,
TYPICAL
EXISTING WELL
5' - 0"
9' - 0" 5' - 0"
5' - 0 1/4" 9' - 0"
This drawing and prints are the property of Reddric k Architecture.
The reproduction, copying or other use of this draw ing without
written consent from Reddrick Architecture is not permitted, except
as permitted by the copyright or architectural work s by the
US Copy Right Act.
Copyright
Architectural Seals
Project Name
Drawing Credits
draftsman
checker
architect
Revisions
Sheet Title
Editable electronic files are available for an addi tional costs. Please
contact the architect for those files. Editable ele ctronic files are
available for reference only and discrepancy betwee n sealed drawings
and editable electronic files shall be reported to the owner and
architect for resolution.
Digital Plans
James Reddrick Architect
www.jr-architect.online
980.254.5348 james@jr-architect.online
1333 Rising Oak Dr, Charlotte, NC, 28206
LLC
5/14/25
5/14/2025 10:12:53 PM
A1.1
J.Reddrick
Warehouse Repairs
2025-1081
Site Plan and Life
Safety Plan
J.Reddrick
J.Reddrick
3/32" = 1'-0" A1.1
2 Site and Life Safety Plan
OWNER FORT MILL HIGHWAY LLC
PHYSICAL ADDRESS 1081 FORT MILL HWY
ACRES 1.91 ACRES
PID 0006 -00 -068.01
UNIFIED DEVELOPMENT ORDINANCE
ZONING CLASSIFICATION GENERAL BUSINESS (GB)
PERMITTED USES LIGHT MANUFACTURING
(TABLE 2.5.3) OUTDOOR STORAGE
WAREHOUSE INDOOR STORAGE
BUSINESS SUPPORT SERVICES
PARKING REQUIREMENTS 1 SPACE PER 500 SQFT OF OFFICE SPACE
(TABLE 7.2.4)
PARKING CALCULATIONS:
MIDLAND GOLF CART OFFICE SALE 231 SQFT/250 SQFT = 1 PARKING SPACE
MIDLAND STORAGE AREA DOES NOT REQUIRE PARKING
VACANT STORAGE -B OFFICE 231 SQFT/500 SQFT = 1 PARKING SPACE
VACANT STORAGE -B STORAGE AREA DOES NOT REQUIRE PARKING
VACANT STORAGE -C OFFICE 231 SQFT/500 SQFT = 1 PARKING SPACE
VACANG STORAGE -C STORAGE AREA DOES NOT REQUIRE PARKING
SOUND DESIGN OFFICE 500 SQFT/500SQFT = 1 PARKING SPACE
SOUND DESIGN STORAGE AREA DOES NOT REQUIRE PARKING
TOP TURF OFFICE 279 SQFT/500 SQFT = 1 PARKING SPACE
TOP TURF STORAE AREA DOES NOT REQUIRE PARKING
TOTAL PARKING SPACES REQUIRED = 5 PARKING SPACES OR AS INDICATED BY ZONING OFFICIALS
TOTAL ACCESSIBLE SPACES REQUIRED = 1 VAN ACCESSIBLE SPACE
TOTAL EXISTING PARKING SPACE PROVIDED = 15 EXISTING PARKING SPACES (PROVIDE NEW WHEEL STOPS)
TOTAL ACCESSIBLE PARKING SPACES PROVIDED = 1 VAN ACCESSIBLE SPACE + 2 ACCESSIBLE SPACE
TOTAL SPACES = 18 PARKING SPACES
SETBACKS 50FT FRONT YARD
TABLE 2.4 15FT SIDE YARD
15FT REAR YARD
N
STORAGE NOTES FOR SUITE E
1. RX FERTILIZER ACCUBLEND PELLET FERTILIZER IS A CLASS 1 COMMODITY. IT IS STORED IN 50LB BAGS
ON PALLETS
2. PRIME TIME TURF TYPE TALL FESCUE BLEND GRASS SEED IS A CLASS 1 COMMODITY. IT IS STORED IN
50LB BAGS ON PALLETS
3. NUTRITE UREA FRILL AGRICULTURAL GRADE 46 -0-0 PELLET FERTILIZER IS A CLASS 1 COMMODITY. IT IS
STORED IN 50LB BAGS ON PALLETS.
4. GATOR EXCEL IRON LIQUID FERTILIZER IS A CLASS 1 COMMODITY. IT IS STORED IN 275 GALLON TOTE
ON PALLETS.
5. DIMENSION 2EW HERBICIDE IS A IRRITANT MATERIAL (NOT TOXIC). IT IS STORED IN 30 GALLON DRUM.
MAQ NOT TO EXCEED 125 GALLONS INSIDE BUILDING.
6. PROPANE GAS CYLINDERS IS A FLAMMABLE GAS. IT IS STORED IN 8 GALLON CYLINDERS. MAQ NOT TO
EXCEED 300 GALLONS. TANKS TO BE STORED OUTSIDE IN AN APPROVED STORAGE CABINET EQUAL TO
USA SAFETY PRODUCT " 4 PROPANE TANKS (33 LB) - OUTDOOR - HORIZONTAL STORAGE - STEEL &
MESH - GAS CYLINDER CAGE"
GENERAL NOTES
1. ALL CONDITIONS ARE EXISTNG UNLESS NOTED OTHERWISE
2. WORK INCLUDES
A. PROVIDING ACCESSIBLE PARKING SPACE,
B. GRAB BARS AT RESTROOM SUITES A, B, C, AND E
C. ADDING A 2HR FIRE BARRIER TO SEPARATE S -2 SPACE FROM S -1 SPACE BETWEEN SUITE A AND SUITE B
D. PROVIDE MANUAL FIRE EXTINGUISHERS AT ALL SUITES
E. PROVIDING EVALUATION AND DOCUMENTATION OF CURRENT FACILITY PLAN STORAGE
F. EXISTING BATH FACILITIES ARE REPLACEMENT OF FIXTURES DONE IN A MANNER THAT MAINTAINED THE LEVEL
OF ACCESSIBLITY PER SOUTH CAROLINA EXISTING BUILDING CODE SECTION 401.2; THUS FIXTURES DOES NOT
HAVE TO COMPLY WITH CURRENT ACCESSIBILITY REQUIREMENTS. HOWEVER GRAB BARS ARE ADDED.
3. LIFE SAFETY TRAVEL DISTANCE SHALL NOT EXCEED 200FT TO AN EXIT. SEE PLAN FOR ACTUAL TRAVEL DISTANCE.
4. AT EACH EXIT DOOR PROVIDE A TACTILE EXIT SIGN
5. AT EACH SUITE A FIRE EXTINGUISHER TO BE PROVIDED
6. ALL EXISTING EXIT DOORS SHALL ALLOW FREE EGRESS.
7. ALL GRAVEL DRIVEWAYS/PARKING, SIDEWALKS, AND LANDSCAPING ARE EXISTING. NO GRADING IS REQUIRED.
8. NEW ITEMS INCLUDE "GRAVEL LOK" TREATMENT AT EXISTING GRAVEL WALKWAY. SEE PLAN FOR LOCATION.
9. NEW ITEMS INCLUDE NEW WHEEL STOPS
10. NEW ITEMS INCLUDE NEW ACCESSIBLE PARKING SIGNAGE
1
1
1
ACCESSIBLE PARKING NOTES:
1. COMPACT EXISTING GRAVEL, TREAT ACCESSIBLE AISLE,
AND 5FT ACCESSIBLE ROUTE IDENTIFIED WITH "GRAVEL
LOK" WHICH IS COMPLIANT WITH ADA REQUIREMENTS
FOR HARD NON -SLIP SURFACES. SEE PLANS FOR CLARITY
ON WHERE TO PROVIDE "GRAVEL LOK" TO EXISTING
HARD SURFACE
2. PROVIDE NEW POLE MOUNTED OR BUILDING MOUNTED
VAN ACCESSIBLE PARKING SIGNAGE
3. PAINT VAN ACCESSIBLE AISLE AT EXISTING GRAVEL AREA
TREATED WITH "GRAVEL LOK". AND PAINT ACCESSIBLE
SYMBOL AT PARKING SPACE
4. PROVIDE NEW POLE MOUNTED OR BUILDING MOUNTED
ACCESSIBLE PARKING SIGNAGE
5. PAINT ACCESSIBLE AISLE AT EXISTING HARD SURFACE
AREA AND PAINT ACCESSIBLE SYMBOL AT PARKING
SPACE
1 WHEEL STOP NOTES:
1. SEE PLAN FOR LOCATION OF NEW WHEEL STOPS. WHEEL ST OP
SHALL BE EQUAL OR BETTER THAN 6FT PLASTIC GRAY WHEEL
STOP MODEL NO. H -2309GR 72X6X3 BY MANUFACTURER ULINE.
INSTALL 3 QTY #4 REINFORCING BARS TO ANCHOR. EMBED AT
LEAST 18".
2. SEE PLAN FOR UNMARKED GRAVEL PARKING SPACES TO
LOCATE NEW WHEEL STOPS
1
1
1
1
1
1
ALL CONDITIONS ARE EXISTING. EXCEPT AS
NOTED IN RED. THE GREEN AREAS ARE EXISTING
LANDSCAPING. NO CHANGES ARE REQUIRED.
GRADING IS NOT REQUIRED. THE WHITE IS
EXSTING HARD SURFACE. NO CHANGES ARE
REQUIRED.
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
No. Description Date
0 Issue for Construction 3/25/25
1 Permit Revisions 4/19/25
2 Permit Revisions 5/14/25
Page 10 of 205
MIDLAND CART
COMPANY
A100
OFFICE
A101
BATH
A102
VACANT
STORAGE
B100
OFFICE
B101
BATH
B102
VACANT
STORAGE
C100
OFFICE
C101
BATH
C102
OFFICE
D102
OFFICE
D103
BREAK
D104
BATH
D105
BATH
D106
BATH
D107
TOP TURF
E100
OFFICE
E101
BATH
E102
JAN
E103
SHOWER
E104
SECURE
STORAGE
E105
Room Legend
BATH
BREAK
Closet
JAN
MIDLAND CART COMPANY
OFFICE
SECURE STORAGE
SHOWER
SOUND DESIGN
SOUND DESIGN STORAGE
TOP TURF
VACANT STORAGE
FORT MILL HIGHWAY
49' - 9 1/2" RECENTLY NEW TENANT
50' - 7"
97' - 0" EXISTING TENANT SINCE 2010 96' - 6 1/2" EXISTING TENANT SINCE 2010
83' - 0" RECENTLY NEW TENANT
60' - 3"
Closet
E106
OFFICE
D101
SOUND DESIGN
STORAGE
D100A
SOUND DESIGN
D100B
S-2 OCCUPANCY
98' - 0"
EXISTING WALL TO BE
COVERED WITH NEW
2HR FIRE BARRIER
SHAFT WALL PER UL
U417. CONTINUITY AT
HEAD AND JAMB OF
WALL SHALL BE EQUAL
TO UL DESIGN CJ -D-004
PROVIDE 36" REAR GRAB BAR
PROVIDE 42" SIDE GRAB BAR
PROVIDE 18" VERTICAL GRAB BAR AT WATER CLOSETS
PROVIDE 36" REAR GRAB BAR
PROVIDE 42" SIDE GRAB BAR
PROVIDE 18" VERTICAL GRAB BAR
AT WATER CLOSET
SEE
ACCESSIBLE
NOTE 4&5
RIGID FIBERLGASS SHEETS ARE CLASS 1 COMMODITY. IT IS STORED IN
PILES ON 4 ’X4 ’ PALLETS.
NON -COMBUSTIBLE STORAGE ITEMS ONLY RIGID FIBERLGASS SHEETS LIGHT MANUFACTURING
EXISTING ELECTRIC
CART STORAGE.
CHARGING STATION IS
NOT REQUIRED OR
PROVIDED
SOUND DESIGN IS EXISTING TENANT SPACE WITH PERMIT. NO CHANGES
REQUIRED. SPACE SHOWN FOR DOCUMENTATION ONLY.
DOCK
EXISTING LANDSCAPING TO
REMAIN NO CHANGES
REQUIRED
SIDE YARD SETBACK
15' - 0"
SIDE YARD SETBACK
15' - 0"
FRONT YARD SETBACK
50' - 0"
REAR YARD SETBACK
15' - 0" EXISTING BUILDING ENCROACHES INTO
SETBACK. POSSIBLY BUILT PRIOR TO THE
ADOPTION OF THE CURRENT ZONING
ORDINANCE; THUS IT IS LEGAL NON -
CONFORMING AND GRANDFATHERED TO
ALLOW ENCROACHMENT INTO SETBACK.
BUILDING BUILT IN 1978.
EXISTING
FORK LIFT
DRIVE APRON
FOR COILING
DOORS
EXISTING BUILDING ENCROACHES INTO
SETBACK. POSSIBLY BUILT PRIOR TO THE
ADOPTION OF THE CURRENT ZONING
ORDINANCE; THUS IT IS LEGAL NON -
CONFORMING AND GRANDFATHERED TO
ALLOW ENCROACHMENT INTO SETBACK.
BUILDING BUILT IN 1978.
A1.0
6
FIRE EXTINGUISHER
FIRE EXTINGUISHER
FIRE EXTINGUISHER
FIRE EXTINGUISHER
FIRE EXTINGUISHER
FIRE EXTINGUISHER
EXIT DISTANCE IS 70FT
OCCUPANT LOAD AT DOOR IS 5 PEOPLE:
THE DOOR CAPACITY IS 360 PEOPLE
THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH
THE EXISTING DOOR WIDTH IS 72"
AREA IS S -1 OCCUPANCY.
OCCUPANT LOAD CALCULATION
2512 SQFT / 500 SQFT PERSON = 5 PERSON
AREA IS S -2 OCCUPANCY.
OCCUPANT LOAD CALCULATION
4949 SQFT / 500 SQFT PERSON = 10 PERSON
EXIT DISTANCE IS 90 FT
OCCUPANT LOAD AT DOOR IS 5 PEOPLE:
THE DOOR CAPACITY IS 170 PEOPLE
THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH
THE EXISTING DOOR WIDTH IS 36"
EXIT DISTANCE IS 90 FT
OCCUPANT LOAD AT DOOR IS 5 PEOPLE:
THE DOOR CAPACITY IS 170 PEOPLE
THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH
THE EXISTING DOOR WIDTH IS 36"
AREA IS F -2 OCCUPANCY.
OCCUPANT LOAD CALCULATION
10 PERSON ACTUAL OCCUPANT LOAD (1004.5 EXCEPTION) 4,906 SQFT
EXIT DISTANCE IS 80 FT
OCCUPANT LOAD AT EACH DOOR IS 5 PEOPLE:
THE DOOR CAPACITY IS 170 PEOPLE
THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH
THE EXISTING DOOR WIDTH IS 36"
AREA IS S -2 OCCUPANCY.
OCCUPANT LOAD CALCULATION
4848 SQFT / 500 SQFT PERSON = 10 PERSON
EXIT DISTANCE IS 100FT
OCCUPANT LOAD AT DOOR IS 5 PEOPLE:
THE DOOR CAPACITY IS 170 PEOPLE
THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH
THE EXISTING DOOR WIDTH IS 36"
EXIT DISTANCE IS 45 FT
OCCUPANT LOAD AT DOOR IS 5 PEOPLE:
THE DOOR CAPACITY IS 170 PEOPLE
THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH
THE EXISTING DOOR WIDTH IS 36"
AREA IS S -2 OCCUPANCY.
OCCUPANT LOAD CALCULATION
5000 SQFT / 500 SQFT PERSON = 10 PERSON
EXIT DISTANCE IS 67 FT
OCCUPANT LOAD AT DOOR IS 5 PEOPLE:
THE DOOR CAPACITY IS 170 PEOPLE
THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH
THE EXISTING DOOR WIDTH IS 36"
EXIT DISTANCE IS 60 FT
OCCUPANT LOAD AT DOOR IS 5 PEOPLE:
THE DOOR CAPACITY IS 170 PEOPLE
THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH
THE EXISTING DOOR WIDTH IS 36"
7' - 6"
OUTDOOR STORAGE OF PROPANE TANKS
IN AN APPROVED STORAGE CABINET.
SCREENED BY 6FFT TALL WOOD FENCE.
EXISTING
LANDSCAPING
ISLAND
5FT WALK WAY EXISTING COMPACTED HARD SURFACE TO BE TREATED WITH "GRAVEL LOK" . SEE ACCESSIBLE NOTE 1
8' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0"
EXISTING LANDSCAPING ISLAND
19' - 0" 19' - 0" 23' - 0 1/2" 19' - 0"
1' - 9 1/2"
6' - 6"
TYPICAL WHEEL
STOP LOCATION.
SEE WHEEL
STOP NOTE 1&2
SEE
ACCESSIBLE
NOTE 2&3
EXISTING LANDSCAPING TO
REMAIN NO CHANGES
REQUIRED
EXISTING LANDSCAPING
TO REMAIN NO
CHANGES REQUIRED
EXISTING LANDSCAPING TO
REMAIN NO CHANGES
REQUIRED
EXISTING HARD SURFACE TO
REMAIN NO CHANGES
REQUIRED
EXISTING HARD SURFACE TO
REMAIN NO CHANGES
REQUIRED
30' - 0"
32' - 0"
EXISTING
SEPTIC
EXISTING SEPTIC
EXISTING SEPTIC
12' - 0" 10' - 0"
CANOPY
18' - 0"
5' - 0"
5' - 0"
23' - 8 3/4"
EXISTING DUMPSTER 6' HEIGHT
6FT OPAQUE WOOD
FENCE WITH WOOD GATE
DOORS
6FT HIGH
WOOD
FENCE
20' - 0" 11' - 10 1/2"
UNMARKED HARD SURFACE
PARKING SPACES TO GET
NEW WHEEL STOPS,
TYPICAL
SEE
ACCESSIBLE
NOTE 4&5
23' - 2 3/4"
UNMARKED HARD
SURFACE PARKING
SPACES TO GET NEW
WHEEL STOPS,
TYPICAL
EXISTING WELL
5' - 0"
9' - 0" 5' - 0"
5' - 0 1/4" 9' - 0"
This drawing and prints are the property of Reddric k Architecture.
The reproduction, copying or other use of this draw ing without
written consent from Reddrick Architecture is not permitted, except
as permitted by the copyright or architectural work s by the
US Copy Right Act.
Copyright
Architectural Seals
Project Name
Drawing Credits
draftsman
checker
architect
Revisions
Sheet Title
Editable electronic files are available for an addi tional costs. Please
contact the architect for those files. Editable ele ctronic files are
available for reference only and discrepancy betwee n sealed drawings
and editable electronic files shall be reported to the owner and
architect for resolution.
Digital Plans
James Reddrick Architect
www.jr-architect.online
980.254.5348 james@jr-architect.online
1333 Rising Oak Dr, Charlotte, NC, 28206
LLC
5/14/25
5/14/2025 10:12:53 PM
A1.1
J.Reddrick
Warehouse Repairs
2025-1081
Site Plan and Life
Safety Plan
J.Reddrick
J.Reddrick
3/32" = 1'-0" A1.1
2 Site and Life Safety Plan
OWNER FORT MILL HIGHWAY LLC
PHYSICAL ADDRESS 1081 FORT MILL HWY
ACRES 1.91 ACRES
PID 0006 -00 -068.01
UNIFIED DEVELOPMENT ORDINANCE
ZONING CLASSIFICATION GENERAL BUSINESS (GB)
PERMITTED USES LIGHT MANUFACTURING
(TABLE 2.5.3) OUTDOOR STORAGE
WAREHOUSE INDOOR STORAGE
BUSINESS SUPPORT SERVICES
PARKING REQUIREMENTS 1 SPACE PER 500 SQFT OF OFFICE SPACE
(TABLE 7.2.4)
PARKING CALCULATIONS:
MIDLAND GOLF CART OFFICE SALE 231 SQFT/250 SQFT = 1 PARKING SPACE
MIDLAND STORAGE AREA DOES NOT REQUIRE PARKING
VACANT STORAGE -B OFFICE 231 SQFT/500 SQFT = 1 PARKING SPACE
VACANT STORAGE -B STORAGE AREA DOES NOT REQUIRE PARKING
VACANT STORAGE -C OFFICE 231 SQFT/500 SQFT = 1 PARKING SPACE
VACANG STORAGE -C STORAGE AREA DOES NOT REQUIRE PARKING
SOUND DESIGN OFFICE 500 SQFT/500SQFT = 1 PARKING SPACE
SOUND DESIGN STORAGE AREA DOES NOT REQUIRE PARKING
TOP TURF OFFICE 279 SQFT/500 SQFT = 1 PARKING SPACE
TOP TURF STORAE AREA DOES NOT REQUIRE PARKING
TOTAL PARKING SPACES REQUIRED = 5 PARKING SPACES OR AS INDICATED BY ZONING OFFICIALS
TOTAL ACCESSIBLE SPACES REQUIRED = 1 VAN ACCESSIBLE SPACE
TOTAL EXISTING PARKING SPACE PROVIDED = 15 EXISTING PARKING SPACES (PROVIDE NEW WHEEL STOPS)
TOTAL ACCESSIBLE PARKING SPACES PROVIDED = 1 VAN ACCESSIBLE SPACE + 2 ACCESSIBLE SPACE
TOTAL SPACES = 18 PARKING SPACES
SETBACKS 50FT FRONT YARD
TABLE 2.4 15FT SIDE YARD
15FT REAR YARD
N
STORAGE NOTES FOR SUITE E
1. RX FERTILIZER ACCUBLEND PELLET FERTILIZER IS A CLASS 1 COMMODITY. IT IS STORED IN 50LB BAGS
ON PALLETS
2. PRIME TIME TURF TYPE TALL FESCUE BLEND GRASS SEED IS A CLASS 1 COMMODITY. IT IS STORED IN
50LB BAGS ON PALLETS
3. NUTRITE UREA FRILL AGRICULTURAL GRADE 46 -0-0 PELLET FERTILIZER IS A CLASS 1 COMMODITY. IT IS
STORED IN 50LB BAGS ON PALLETS.
4. GATOR EXCEL IRON LIQUID FERTILIZER IS A CLASS 1 COMMODITY. IT IS STORED IN 275 GALLON TOTE
ON PALLETS.
5. DIMENSION 2EW HERBICIDE IS A IRRITANT MATERIAL (NOT TOXIC). IT IS STORED IN 30 GALLON DRUM.
MAQ NOT TO EXCEED 125 GALLONS INSIDE BUILDING.
6. PROPANE GAS CYLINDERS IS A FLAMMABLE GAS. IT IS STORED IN 8 GALLON CYLINDERS. MAQ NOT TO
EXCEED 300 GALLONS. TANKS TO BE STORED OUTSIDE IN AN APPROVED STORAGE CABINET EQUAL TO
USA SAFETY PRODUCT " 4 PROPANE TANKS (33 LB) - OUTDOOR - HORIZONTAL STORAGE - STEEL &
MESH - GAS CYLINDER CAGE"
GENERAL NOTES
1. ALL CONDITIONS ARE EXISTNG UNLESS NOTED OTHERWISE
2. WORK INCLUDES
A. PROVIDING ACCESSIBLE PARKING SPACE,
B. GRAB BARS AT RESTROOM SUITES A, B, C, AND E
C. ADDING A 2HR FIRE BARRIER TO SEPARATE S -2 SPACE FROM S -1 SPACE BETWEEN SUITE A AND SUITE B
D. PROVIDE MANUAL FIRE EXTINGUISHERS AT ALL SUITES
E. PROVIDING EVALUATION AND DOCUMENTATION OF CURRENT FACILITY PLAN STORAGE
F. EXISTING BATH FACILITIES ARE REPLACEMENT OF FIXTURES DONE IN A MANNER THAT MAINTAINED THE LEVEL
OF ACCESSIBLITY PER SOUTH CAROLINA EXISTING BUILDING CODE SECTION 401.2; THUS FIXTURES DOES NOT
HAVE TO COMPLY WITH CURRENT ACCESSIBILITY REQUIREMENTS. HOWEVER GRAB BARS ARE ADDED.
3. LIFE SAFETY TRAVEL DISTANCE SHALL NOT EXCEED 200FT TO AN EXIT. SEE PLAN FOR ACTUAL TRAVEL DISTANCE.
4. AT EACH EXIT DOOR PROVIDE A TACTILE EXIT SIGN
5. AT EACH SUITE A FIRE EXTINGUISHER TO BE PROVIDED
6. ALL EXISTING EXIT DOORS SHALL ALLOW FREE EGRESS.
7. ALL GRAVEL DRIVEWAYS/PARKING, SIDEWALKS, AND LANDSCAPING ARE EXISTING. NO GRADING IS REQUIRED.
8. NEW ITEMS INCLUDE "GRAVEL LOK" TREATMENT AT EXISTING GRAVEL WALKWAY. SEE PLAN FOR LOCATION.
9. NEW ITEMS INCLUDE NEW WHEEL STOPS
10. NEW ITEMS INCLUDE NEW ACCESSIBLE PARKING SIGNAGE
1
1
1
ACCESSIBLE PARKING NOTES:
1. COMPACT EXISTING GRAVEL, TREAT ACCESSIBLE AISLE,
AND 5FT ACCESSIBLE ROUTE IDENTIFIED WITH "GRAVEL
LOK" WHICH IS COMPLIANT WITH ADA REQUIREMENTS
FOR HARD NON -SLIP SURFACES. SEE PLANS FOR CLARITY
ON WHERE TO PROVIDE "GRAVEL LOK" TO EXISTING
HARD SURFACE
2. PROVIDE NEW POLE MOUNTED OR BUILDING MOUNTED
VAN ACCESSIBLE PARKING SIGNAGE
3. PAINT VAN ACCESSIBLE AISLE AT EXISTING GRAVEL AREA
TREATED WITH "GRAVEL LOK". AND PAINT ACCESSIBLE
SYMBOL AT PARKING SPACE
4. PROVIDE NEW POLE MOUNTED OR BUILDING MOUNTED
ACCESSIBLE PARKING SIGNAGE
5. PAINT ACCESSIBLE AISLE AT EXISTING HARD SURFACE
AREA AND PAINT ACCESSIBLE SYMBOL AT PARKING
SPACE
1 WHEEL STOP NOTES:
1. SEE PLAN FOR LOCATION OF NEW WHEEL STOPS. WHEEL ST OP
SHALL BE EQUAL OR BETTER THAN 6FT PLASTIC GRAY WHEEL
STOP MODEL NO. H -2309GR 72X6X3 BY MANUFACTURER ULINE.
INSTALL 3 QTY #4 REINFORCING BARS TO ANCHOR. EMBED AT
LEAST 18".
2. SEE PLAN FOR UNMARKED GRAVEL PARKING SPACES TO
LOCATE NEW WHEEL STOPS
1
1
1
1
1
1
ALL CONDITIONS ARE EXISTING. EXCEPT AS
NOTED IN RED. THE GREEN AREAS ARE EXISTING
LANDSCAPING. NO CHANGES ARE REQUIRED.
GRADING IS NOT REQUIRED. THE WHITE IS
EXSTING HARD SURFACE. NO CHANGES ARE
REQUIRED.
1
1
1
1
1
1
2
2
2
2
2
2
2
2
2
2
2
2
2
No. Description Date
0 Issue for Construction 3/25/25
1 Permit Revisions 4/19/25
2 Permit Revisions 5/14/25
Page 11 of 205
Page 12 of 205
Page 13 of 205
Page 14 of 205
Page 15 of 205
Page 16 of 205
Agenda Item Summary
Ordinance # / Resolution # :
Contact Person / Sponsor:
Department:
Date Requested to Be on Agenda: 2/5/2026
Council Action Requested:
Strategic Plan Focus Alignment:
Points to Consider:
Funding and Liability Factors:
Recommendation:
Attachments:
1. notice-map
2. Scanned application_Redacted
3. PreliminaryPlat_2026
4. TRC Not Approved Letter 1-22-2026
5. TrafficImpactAnalysis_2023
6. ICE REview Memo TIA May 2024
7. ApplicantresponsetoTIAComments_November 2024
8. TRC Letter January 2025
9. Deed 1529-361529_36
10. Deed 1715_201
Page 17 of 205
Page 18 of 205
Page 19 of 205
Page 20 of 205
Page 21 of 205
Page 22 of 205
Page 23 of 205
Page 24 of 205
Page 25 of 205
Lancaster County
Planning Department
P. O. Box 1809
Lancaster, SC 29721
803.285.6005
planning@lancastercountysc.net
969 E. 7th Street, Suite 100
Charlotte, NC 28204
R. B. Pharr & Associates, P.A.
January 22, 2026
Charles Vander Pleog
Parcel(s)
Stage
Location
Project Number
Status
Preliminary Plat
Not Approved
0006-00-057.00
9901 & 9831 Barberville Road
Project Name Barberville Commercial
20231869
Dear: Charles Vander Pleog
We have completed our review of the plan identified above. The comments listed on the attached report must be addressed
and revised plans submitted with a response letter.
If the attached comments require changes to the plans, please submit the requisite number of sets, along with a pdf of the
plan set on a CD, to the Lancaster County Planning Department.
Once revised plans are received, they will be submitted to staff for review.
*Please be aware that plans will not be routed for review without a response letter*
Sincerely,
Page 1 of 31/22/2026
Page 26 of 205
Plan Review Comments
County Engineer - Stephen Blackwelder - 8035482406
sblackwelder@lancastercountysc.gov
Approved
Review Comments:
E911 Address - Sandra Burton - (803) 416-9325
sburton@lanc911.com
Approved
Review Comments:
No issues noted.
Fire Marshal - Mike Magette - 8032838888
jmagette@lancastercountysc.gov
Conditional
Review Comments:
1. Dead end fire apparatus access roads longer than 150 feet in length will require an approved turnaround. Plan shows an
easement to Fort Mill Highway which will need to be constructed at the same time as Melanie Lane to avoid a dead end fire
apparatus access road.
LC Water & Sewer District - James Hawthorne - (803) 285-6919
jhawthorne@lcwasd.org
Approved
Review Comments:
Planning - Kirsten Willis - 803-285-6005
kwillis@lancastercountysc.gov
Not Approved
Review Comments:
1. Preliminary is missing site analysis. Please provide site analysis that details existing conditions. (Reference Chp. 9.2.5 &
9.2.5.A p. 295-296)
a. HCO frontage buffers are depicted on survey but include tree preservation/planting plan whichever is applicable within
the site analysis.
2. Plan includes incorrect buffer depiction/notation. Please include in notes that details buffer type and which option chosen.
Adjacent parcels, MDR, which requires a Type B. (Reference Chp. 7.1.5.A, p. 211) for requirement, reference Chp. 7.1.5.B.2
p. 212 for options/opacity etc.
3.TIA will require amendment. Proposed build out year will need to be updated as well as how second outlet onto Fort Mill
Highway was removed and original TIA doesn't include all 7 parcels submitted via this preliminary.
4. Parcel 3 missing front setback of 25'. (Reference Chp. 2.4, p. 23)
5. Parcel 4 missing front setback of 50', and side setbacks 15'. (Reference Chp. 2.4, p. 23)
6. Parcel 5 missing side setbacks 15'. (Reference Chp. 2.4, p. 23)
7. Parcel 6 missing side setbacks of 15' and has incorrect rear setback depicted, required 15'. (Reference Chp. 2.4, p. 23)
8. Certificate of Approval for Planning Dept. not necessary, please remove.
Page 2 of 31/22/2026
Page 27 of 205
LC School District - Jonathan Duke - 803-416-8010
john.duke@lcsd.k12.sc.us
No Review Needed
Review Comments:
SCDOT - David Gamble - (803) 385-4280
GambleDD@scdot.org
No Review Done
Review Comments:
Encroachment permits has already been issued for this site.
Page 3 of 31/22/2026
Page 28 of 205
TRAFFIC IMPACT STUDY
for the
Barberville Road
Development
Located in
Lancaster County, South Carolina
Prepared for
Moody Holdings & Development
Prepared by
Ramey Kemp Associates, Inc.
June 2023
RKA Project #23126
Page 29 of 205
TRAFFIC IMPACT STUDY
for the
Barberville Road
Development
Located in
Lancaster County, South Carolina
Prepared for
Moody Holdings & Development
6201 Fairview Rd, Ste 200
Charlotte, North Carolina 28210
Prepared by
Ramey Kemp Associates, Inc.
1411 Gervais Street, Suite 150
Columbia, South Carolina 29201
June 2023
RKA Project #23126
Page 30 of 205
Barberville Road TIS | i
Table of Contents
EXECUTIVE SUMMARY .................................................................................................................. iii
1.1. Project Background ............................................................................................. 1
1.2. Existing Roadway Conditions ........................................................................... 4
1.3. Existing Traffic Count ........................................................................................ 4
1.4. Driveway Location ............................................................................................. 4
2. PROJECT TRAFFIC ...................................................................................................................... 7
2.1. Proposed Land Uses ........................................................................................... 7
2.2. Trip Generation Estimates ................................................................................. 7
2.3. Trip Distribution & Assignment ....................................................................... 8
3. TRAFFIC VOLUME DEVELOPMENT .................................................................................... 11
3.1. Future No-Build Traffic Volumes ................................................................... 11
3.2. Build Out Traffic Volumes ............................................................................... 11
4. TRAFFIC IMPACT ANALYSIS ................................................................................................. 14
4.1. Turn-Lane Analysis .......................................................................................... 14
4.2. Intersection LOS Analysis ................................................................................ 14
5. SUMMARY OF FINDINGS AND RECOMMENDATIONS ................................................. 18
Page 31 of 205
Barberville Road TIS | ii
List of Tables
Table 1 – Street Inventory ......................................................................................................................... 4
Table 2 – Trip Generation Estimates ....................................................................................................... 7
Table 3 – HCM 6th Edition LOS Criteria for Unsignalized and Signalized Intersections ................ 14
Table 4 – Unsignalized and Signalized Intersection Analysis Results ............................................. 15
Table 5 – Unsignalized and Signalized Intersection Analysis Results ............................................. 16
List of Figures
Figure 1 – Project Location Map .............................................................................................................. 2
Figure 2 – Conceptual Site Plan ............................................................................................................... 3
Figure 3 – Existing Lane Configuration .................................................................................................. 5
Figure 4 – Existing (2023) Peak-Hour Traffic Volumes ........................................................................ 6
Figure 5 – Project Trip Distribution ......................................................................................................... 9
Figure 6 – Project Trip Assignment ....................................................................................................... 10
Figure 7 – No-Build (2026) Peak-Hour Traffic Volumes .................................................................... 12
Figure 8 – Build (2026) Peak-Hour Traffic Volumes ........................................................................... 13
Figure 9 – Proposed Lane Configuration .............................................................................................. 17
List of Appendices
A) Traffic Scoping
B) Traffic Count Data
C) Traffic Volume Development Worksheets and ITE Trip Generation Worksheets
D) Turn-Lane Analysis Worksheets
E) Capacity Analysis
Page 32 of 205
Barberville Road TIS | iii
EXECUTIVE SUMMARY
A traffic impact study was conducted for the proposed Barberville Road development in
accordance with SCDOT guidelines. The development is located west of Barberville Road (S-29-42)
and north of SC 160 in Lancaster County, South Carolina. The development is proposed to consist
of a roughly 120 student school/daycare center, 18,000 SF of retail space and 8,000 SF of office
space. The site will have one access on Barberville Road, with internal connections to adjacent
parcels.
Based on the anticipated build out volumes, a northbound left turn lane is warranted and
recommended on Barberville Road at the access point. An auxiliary southbound right turn lane is
not warranted. The site access should include one ingress and two egress lanes (50’ storage) and
should be designed to provide proper sight distances and meet SCDOT design criteria.
With construction of the project, Barberville Road & Harbor Bay Drive should continue to function
adequately.
The intersection of Fort Mill Highway (SC 160) at Barberville Road expected to experience delays
with or without the development. Lancaster County guidelines specify that if the LOS on a
principal arterial is below LOS D, then the TIS “shall identify those improvements required to
ensure that development related traffic demands result in no net reduction in LOS, and identify
additional improvements needed to raise the level of service on the applicable street to the adopted
LOS standard.”
The signalized Fort Mill Highway & Barberville Road intersection currently operates as an LOS E
and is expected to reach LOS F in the No Build conditions. Auxiliary turn lanes are already present
on SC 160 and on southbound Barberville Road. Raising the level of service on the Fort Mill
Highway (SC 160) at Barberville Road to a LOS D would require additional eastbound and
westbound through lanes along SC 160, along with signal timing optimization. TIS’s for the
background developments (2,000+ residential units) did not recommend widening SC 160 as part
of the background conditions.
The proposed development should not add significant amounts of traffic to the area. No additional
improvements to the area roadways are recommended as part of this development.
Page 33 of 205
Barberville Road TIS | 1
1. INTRODUCTION
The purpose of this report is to document a traffic impact study for the proposed Barberville Road
development in accordance with SCDOT guidelines. This report summarizes the procedures and
findings of the traffic impact study. Traffic scoping documentation is provided in Appendix A.
1.1. Project Background
The development is located west of Barberville Road (S-29-42) and north of SC 160 in Lancaster
County, South Carolina. The development is proposed to consist of a roughly 120 student
school/daycare center, 18,000 SF of retail space and 8,000 SF of office space. The site will have one
access on Barberville Road, with internal connections to adjacent parcels.
The traffic impact study considers the weekday AM peak period (between 7:00 AM and 9:00 AM)
and the weekday PM peak period (between 4:00 PM and 6:00 PM) as the study time frames. The
following intersections are studied:
Fort Mill Highway (SC 160) & Barberville Road (S-29-42)/ Stock Lane
Barberville Road (S-29-42) & Harbor Bay Drive
Barberville Road (S-29-42) & Fortson Road /Site Access
Future-year analyses assume 2026 conditions as the Build scenario. Figure 1 shows the location of
the project site, and Figure 2 illustrates the conceptual site plan.
Page 34 of 205
Barberville Road TIS - Traffic Impact Study
Figure 1 - Project Location Map
Page 2
Barberville RoadHarbor Bay LaneSite Access
Page 35 of 205
Barberville Road TIS - Traffic Impact Study
Figure 2 - Conceptual Site Plan
Page 3
Page 36 of 205
Barberville Road TIS | 4
1.2. Existing Roadway Conditions
A review of the existing roadway conditions in the study area was conducted and is summarized
in Table 1. Figure 3 illustrates the existing lane geometry.
Table 1 – Street Inventory
1.SCDOT Count Station 29-0163; 2.SCDOT Count Station 29-0195
1.3. Existing Traffic Count
Vehicle turning movement counts were collected in May 2023 for the AM peak period (7:00 AM to
9:00 AM) and PM peak period (4:00 PM to 6:00 PM) at the following intersections:
Fort Mill Highway (SC 160) & Barberville Road (S-29-42)/ Stock Lane
Barberville Road (S-29-42) & Harbor Bay Drive
All counts were conducted while the local school district was in session. The 2023 raw traffic
volumes are provided in Appendix A. Existing traffic volumes are illustrated in Figure 4.
1.4. Driveway Location
The development is expected to provide one (1) full access driveway on Barberville Road. The
proposed site Access is located approximately 670 feet north of Fort Mill Highway.
The proposed driveways appear to meet the SCDOT ARMS spacing requirements.
Facility Name Route # Typical Cross
Section
Posted
Speed
Limit
Maintained
By
2021
AADT
Fort Mill Highway SC 160 3-lane undivided
(TWLTL) 45 MPH SCDOT 15,200 1
Barberville Road S-29-42 2-lane undivided 40 MPH SCDOT 7,900 2
Stock Lane N/A 2-lane undivided N/P Local N/A
Harbor Bay Drive N/A 2-lane undivided N/P Local N/A
Fortson Road N/A 2-lane undivided N/P Local N/A
Page 37 of 205
Page 5
Barberville Road TIS - Traffic Impact Study
Figure 3 - Existing Lane Configuration
260'
210'220'
Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane
Harbor Bay Lane
Page 38 of 205
2 '2'!
3 '3'!
1 '1'!
Page 6
0
(1)(0)(0)
Barberville Road TIS - Traffic Impact Study
Figure 4 - Existing (2023) Peak-Hour Traffic Volumes
0 (0)
(312) 525
(785) 759
000
(0)
2610124
120 (202)
565 (695)
(511)(145)(0)(366)641388 (516)
(22) 19
(32)(479)5636
(10) 31
10369(5)(494)
Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane
Harbor Bay Lane
Page 39 of 205
Barberville Road TIS | 7
2. PROJECT TRAFFIC
2.1. Proposed Land Uses
The Barberville Road development is proposed to contain a 120 student school/daycare center,
with additional parcels that are envisioned to include approximately 18,000 SF of retail space and
8,000 SF of office space. The project site is currently vacant.
2.2. Trip Generation Estimates
The trip generation potential was estimated using information contained in ITE’s Trip Generation
Manual, 11th Edition (2021) for land use code (LUC) 565 – Day Care Center, (LUC) 822 Strip Retail
Plaza and (LUC) 712 – Small Office Building . The trip generation estimates for the weekday daily,
the weekday AM peak-hour of the adjacent street, and the weekday PM peak-hour of the adjacent
street time periods are shown in Table 2.
Table 2 – Trip Generation Estimates
Page 40 of 205
Barberville Road TIS | 8
2.3. Trip Distribution & Assignment
New external traffic expected to be generated was distributed and assigned to the roadway
network based on the existing patterns and surrounding land uses. The general distribution of new
external project trips was assumed to be:
70% to/from the south via Barberville Road and
30% to/from the north via Barberville Road
The directional distribution assumptions are shown in Figure 5. The assignment of the project
traffic is shown in Figure 6.
Page 41 of 205
30%30%30%70%
30%
70%50%20%
Page 9
Barberville Road TIS - Traffic Impact Study
Figure 5 - Project Trip Distribution
20%
50%
Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane
Site AccessHarbor Bay Lane30%
50%20%
Project Site
Page 42 of 205
2 '2'!
3 '3'!
1 '1'!
Page 10
Barberville Road TIS - Traffic Impact Study
Figure 6 - Project Trip Assignment
16 (20)
(53) 41
3112
43
(73)(58)(23)57
(35) 18
(81)
25 (32)(35) 1825 (32)
Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane
Site AccessHarbor Bay LaneProject Site
Page 43 of 205
Barberville Road TIS | 11
3. TRAFFIC VOLUME DEVELOPMENT
3.1. Future No-Build Traffic Volumes
To develop an annual background growth rate for use in the analysis, count data was reviewed
from the years 2017 to 2020 at SCDOT Count Station 29-0163 and 29-195. Reviewing the historic
growth and observing the growth pattern in the surrounding area, a 1.0% annual growth was
adopted for this study. This annual growth rate was utilized to develop the 2026 No-Build traffic
volumes.
Several vested developments were considered for the study area. Site traffic from the Lodges at
Indian Land, Harrisburg Road Residential (Sugar Creek), Redwood Apartments, Pettus Pond,
Patterson Preserve and Patterson Lane Apartments were included in the vested trips. The vested
projects include a total of 2,014 residential units expected to be completed before the Barberville
Road development build out. None of the Traffic Impact Studies for these developments
recommended any improvements to the Fort Mill Highway (SC 160) at Barberville Road.
The site trips from the vested developments are provided in Appendix A. The 2026 No-Build
volumes are illustrated in Figure 7.
3.2. Build Out Traffic Volumes
The site generated traffic volumes were added to the 2026 No-Build traffic volumes to determine
the 2026 Build volumes. The 2026 Build volumes are illustrated in Figure 8. Volume development
worksheets are included in Appendix B.
Page 44 of 205
2 '2'!
3 '3'!
1 '1'!
Page 12
0
(1)(0)(0)
Barberville Road TIS - Traffic Impact Study
Figure 7 - No-Build (2026) Peak-Hour Traffic Volumes
0 (0)
(424) 573
(865) 821
000
(0)
3610167
159 (242)
633 (749)
(663)(208)(0)(412)727531 (625)
(23) 20
(33)(630)5722
(10) 32
10511(5)(603)
Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane
Harbor Bay Lane
Page 45 of 205
2 '2'!
3 '3'!
1 '1'!
Page 13
0
(1)(0)(0)
Barberville Road TIS - Traffic Impact Study
Figure 8 - Build (2026) Peak-Hour Traffic Volumes
0 (0)
(477) 614
(865) 821
000
(0)
3920179
175 (262)
633 (749)
43
(73)(663)(266)(0)(435)57727
(35) 18
(81)
25531(32)(625)
(23) 20
(33)(665)5740
(10) 32
10536(5)(635)
Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane
Site AccessHarbor Bay LaneProject Site
Page 46 of 205
Barberville Road TIS | 14
4. TRAFFIC IMPACT ANALYSIS
4.1. Turn-Lane Analysis
Auxiliary turn-lane analyses were conducted using the 2026 Build volumes. Turn-lane analyses
were considered based on the SCDOT Roadway Design Manual (RDM) Section 9.5.1.
Based on the anticipated build out volumes, a northbound left turn lane is warranted and
recommended on Barberville Road at the access point. An auxiliary southbound right turn lane is
not warranted. The site access should be designed to provide proper sight distances and meet
SCDOT design criteria.
Turn-lane analyses are provided in Appendix D.
4.2. Intersection LOS Analysis
Intersection analyses were conducted for the study intersections considering 2023 Existing
conditions, 2026 No-Build conditions, and 2026 Build conditions. This analysis was conducted
using the Transportation Research Board’s Highway Capacity Manual 6th Edition (HCM 6th Edition)
methodologies of the Synchro, Version 11 software.
Intersection level of service (LOS) grades range from LOS A to LOS F, which are directly related to
the level of control delay at the intersection and characterize the operational conditions of the
intersection traffic flow. LOS A operations typically represent ideal, free-flow conditions where
vehicles experience little to no delays, and LOS F operations typically represent poor, forced-flow
(bumper-to-bumper) conditions with high vehicular delays and are generally considered
undesirable. Table 3 summarizes the HCM 6th Edition control delay thresholds associated with each
LOS grade for unsignalized and signalized intersections.
Table 3 – HCM 6th Edition LOS Criteria for Unsignalized and Signalized Intersections
Unsignalized Intersections Signalized Intersections
LOS Control Delay per
Vehicle (seconds)
LOS Control Delay per
Vehicle (seconds)
A ≤ 10 A ≤ 10
B > 10 and ≤ 15 B > 10 and ≤ 20
C > 15 and ≤ 25 C > 20 and ≤ 35
D > 25 and ≤ 35 D > 35 and ≤ 55
E > 35 and ≤ 50 E > 55 and ≤ 80
F > 50 F > 80
Page 47 of 205
Barberville Road TIS | 15
As part of the intersection analysis, SCDOT’s default Synchro parameters were utilized. A constant
PHF of 0.92 was applied for future year analysis. Existing heavy vehicle percentages were utilized
for all analysis scenarios, with a minimum percentage of 2% considered.
Using the Synchro software, intersection analyses were conducted for the weekday AM peak-hour
and weekday PM peak-hour time periods. A 150-foot storage northbound left turn lane was
analyzed in the build conditions at the site access. The results of the intersection analyses are
summarized in Table 4.
Table 4 – Unsignalized and Signalized Intersection Analysis Results
Intersection Approach
LOS/Delay (seconds)
2023 Existing
Conditions
2026 No-Build
Conditions
2026 Build
Conditions
AM PM AM PM AM PM
Fort Mill Highway
(SC 160) &
Barberville Road
(Signalized)
EB C/34.9 C/19.2 E/66.7 C/34.0 E/76.3 D/39.6
WB C/20.3 C/27.4 E/64.6 F/148.5 D/51.9 F/168.0
NB A/0.0 E/75.5 A/0.0 F/88.7 A/0.0 F/88.7
SB E/70.4 F/198.9 F/84.3 F/86.2 F/105.8 F/99.2
Overall D/36.5 E/58.8 E/69.5 F/84.3 E/75.7 F/95.8
Barberville Road &
Harbor Bay Drive
(Unsignalized)
EB1 C/19.4 C/15.9 C/26.5 C/20.1 D/27.8 C/21.5
NB2 A/8.2 A/8.6 A/8.6 A/9.0 A/8.7 A/9.2
Barberville Road &
Site Access
(Unsignalized)
EB -- -- -- -- C/20.3 D/26.9
NB2 -- -- -- -- A/8.9 A/9.5
1.LOS for major street left-turn movement; 2.LOS for minor street approach
With construction of the project, Barberville Road & Harbor Bay Drive should continue to function
adequately. The site access should include one ingress and two egress lanes (50’ storage).
The intersection of Fort Mill Highway (SC 160) at Barberville Road expected to experience delays
with or without the development. Lancaster County guidelines specify that if the LOS on a
principal arterial is below LOS D, then the TIS “shall identify those improvements required to
ensure that development related traffic demands result in no net reduction in LOS, and identify
additional improvements needed to raise the level of service on the applicable street to the adopted
LOS standard.”
The signalized Fort Mill Highway & Barberville Road intersection currently operates as an LOS E.
and is expected to reach LOS F in the No Build conditions. Auxiliary turn lanes are already present
on SC 160 and on southbound Barberville Road. To raise the level of service on the Fort Mill
Page 48 of 205
Barberville Road TIS | 16
Highway (SC 160) at Barberville Road to a LOS D, additional eastbound and westbound through
lanes along SC 160 would be required, along with signal timing optimization.
TIS’s for the background developments (2,000+ residential units) did not recommend widening SC
160 as part of the background conditions. The proposed development should not add significant
amounts of traffic to the area. No additional improvements to the area roadways are recommended
as part of this development.
If SC 160 were widened to provide a four-lane section, the LOS would be as shown in Table 5.
Table 5 – Unsignalized and Signalized Intersection Analysis Results
Intersection Approach
LOS/Delay
(seconds)
2026 Build
Improved
Conditions
AM PM
Fort Mill Highway
(SC 160) &
Barberville Road
(Signalized)
EB C/34.5 C/27.5
WB C/28.6 C/33.5
NB A/0.0 F/88.7
SB E/77.8 E/73.3
Overall D/41.6 D/40.0
Figure 9 shows the recommended lane configuration for the Build (2026) condition. A capacity
analysis summary is proved in Appendix D.
Page 49 of 205
Page 17
Barberville Road TIS - Traffic Impact Study
Figure 9 - Proposed Lane Configuration
250'
225'200' 150'
50'
Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane
Site AccessHarbor Bay LaneProject Site
Page 50 of 205
Barberville Road TIS | 18
5. SUMMARY OF FINDINGS AND RECOMMENDATIONS
A traffic impact study was conducted for the proposed Barberville Road development in
accordance with SCDOT guidelines. The development is located west of Barberville Road (S-29-42)
and north of SC 160 in Lancaster County, South Carolina. The development is proposed to consist
of a roughly 120 student school/daycare center, 18,000 SF of retail space and 8,000 SF of office
space. The site will have one access on Barberville Road, with internal connections to adjacent
parcels.
Based on the anticipated build out volumes, a northbound left turn lane is warranted and
recommended on Barberville Road at the access point. An auxiliary southbound right turn lane is
not warranted. The site access should include one ingress and two egress lanes (50’ storage) and
should be designed to provide proper sight distances and meet SCDOT design criteria.
With construction of the project, Barberville Road & Harbor Bay Drive should continue to function
adequately.
The intersection of Fort Mill Highway (SC 160) at Barberville Road expected to experience delays
with or without the development. Lancaster County guidelines specify that if the LOS on a
principal arterial is below LOS D, then the TIS “shall identify those improvements required to
ensure that development related traffic demands result in no net reduction in LOS, and identify
additional improvements needed to raise the level of service on the applicable street to the adopted
LOS standard.”
The signalized Fort Mill Highway & Barberville Road intersection currently operates as an LOS E.
and is expected to reach LOS F in the No Build conditions. Auxiliary turn lanes are already present
on SC 160 and on southbound Barberville Road. Raising the level of service on the Fort Mill
Highway (SC 160) at Barberville Road to a LOS D would require additional eastbound and
westbound through lanes along SC 160, along with signal timing optimization. TIS’s for the
background developments (2,000+ residential units) did not recommend widening SC 160 as part
of the background conditions.
The proposed development should not add significant amounts of traffic to the area. No additional
improvements to the area roadways are recommended as part of this development.
Page 51 of 205
APPENDIX A
Traffic Scoping
Page 52 of 205
1
Tahera Anjuman
From: Love, Allison C. <LoveAC@scdot.org>
Sent: Wednesday, March 29, 2023 12:43 PM
To: Tahera Anjuman
Cc: Gamble, David D.; Stephen Blackwelder
Subject: RE: Traffic Scoping for SC 160 and Barberville Road TIS Development
Good afternoon, Tahera.
I agree with the times for traffic counts. Please make sure they are recorded while school is in regular session, and not
while school is out for spring break.
Please include these study intersections:
Harbor Bay Drive/Barberville Road
Site Access/Fortson Road
Barberville Road/SC Highway 160/Stock Lane
Lancaster County staff can tell you about any developments in the area that have received site plan or preliminary plat
approval, but have not been built.
It looks like the road into the adjacent subdivision to the north was stubbed as a cul-de-sac for connectivity between the
neighborhood and this parcel. If that is the case, then the Department would support that connection, as the proposed
commercial uses could be patronized by the residents without adding turn movements onto Barberville Road.
Thank you,
Allison
From: Tahera Anjuman <tanjuman@rameykemp.com>
Sent: Friday, March 24, 2023 9:11 AM
To: Love, Allison C. <LoveAC@scdot.org>
Subject: Traffic Scoping for SC 160 and Barberville Road TIS Development
*** This is an EXTERNAL email. Please do not click on a link or open any attachments unless you are
confident it is from a trusted source. ***
Good Morning Allison,
I hope you are doing well. We have a request for a proposal near SC 160 and Barberville Road in Lancaster County.
Please see attached site plan. The development is proposed to consist of a roughly 120 student school/daycare Center,
with additional parcels that are envisioned to include approximately 18,000 SF of retail space and 8,000 SF of office
space. I am assuming the following traffic count for the project between 7-9AM and 4-6PM should be sufficient. Please
let me know your thoughts and what vested developments you would like us to consider for this project. If you have any
other considerations or concerns, please do let me know. I appreciate your guidance.
SC 160 & Barberville Road (S-29-42)
Thanks,
Page 53 of 205
1
Tahera Anjuman
From: Chanda Kirkland <CKirkland@lancastersc.net>
Sent: Friday, May 19, 2023 1:05 PM
To: Tahera Anjuman
Cc: Stephen Blackwelder
Subject: RE: Traffic Scoping for SC 160 and Barberville Road TIS Development
Good Morning Anjuman,
Below are vested projects that may need to be included in the study.
1. The Lodges Development consisting of multi-family apartments, townhomes and cottages.
2. Sugar Creek
3. Redwood
4. Pettus Pond
5. Patterson Preserve
6. Tapestry Patterson Lane Apartments
You can use our online project portal to search the above projects to hopefully get the information you need if no the
engineer contact information is also listed. Hope this information helps.
Chanda
www.mylancastersc.org
Chanda Kirkland, Development Service
Coordinator
Building
Lancaster County Government
PO Box 1809
101 N Main St
Lancaster, SC 29720
P: (803) 416-9390 F: (877) 636-3035
CKirkland@lancastersc.net
CONFIDENTIALITY NOTICE: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain private, restricted and/or
legally privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender
by reply email and destroy all copies of the original message. Please note that any views or opinions presented in this email are solely those of the author and do not
necessarily represent those of Lancaster County. Finally, the recipient should check this email and any attachments for the presence of viruses. Lancaster County
accepts no liability for any damage caused by any virus transmitted by this email.
NOTICE: All email correspondence to and from this address may be subject to public disclosure under the SC Freedom of Information Act.
From: Stephen Blackwelder <sblackwelder@lancastersc.net>
Sent: Thursday, May 18, 2023 1:55 PM
To: Chanda Kirkland <CKirkland@lancastersc.net>
Subject: FW: Traffic Scoping for SC 160 and Barberville Road TIS Development
You don't often get email from ckirkland@lancastersc.net. Learn why this is important
Page 54 of 205
Page 55 of 205
Page 56 of 205
Page 57 of 205
Page 58 of 205
Page 59 of 205
Page 60 of 205
Page 61 of 205
Page 62 of 205
Page 63 of 205
Page 64 of 205
APPENDIX B
Traffic Count Data
Page 65 of 205
BARBERVILLE RD BARBERVILLE RDHARBOR BAY DRHARBOR BAY DR(303) 216-2439www.alltrafficdata.netLocation:1 BARBERVILLE RD & HARBOR BAY DR AMWednesday, May 3, 2023Date:
Peak Rolling Hour Flow Rates
Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - PedestriansTraffic Counts - Motorized VehiclesNote: Total study counts contained in parentheses.Peak Hour:07:30 AM - 08:30 AMPeak 15-Minutes:08:00 AM - 08:15 AM
Heavy Vehicle Percentage and Peak Hour Factor
379 6670064138850150.97NSEW0.910.000.940.83(1,147)(684)()()(40)(101)(1,107)(705)10000001903100369563600HARBOR BAY DRHARBOR BAY DRBARBERVILLE RDBARBERVILLE RD
0000NSEW00000000
0000NSEW00000000LeftThruRightTotalEastboundIntervalStart TimeRollingHourWest East South NorthPedestrian CrossingsU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn7:00 AM 0 1 108 0 0 500 8 0 0 0 0 176 0 0 0 09207 0 0 27:15 AM 0 0 130 0 0 730 11 0 0 0 0 221 0 0 0 01,0193 0 0 47:30 AM 0 2 164 0 0 880 13 0 0 0 0 273 0 0 0 01,0703 0 0 37:45 AM 0 1 147 0 0 910 3 0 0 0 0 250 0 0 0 01,0195 0 0 38:00 AM 0 1 156 0 0 1030 7 0 0 0 0 275 0 0 0 09727 0 0 18:15 AM 0 1 169 0 0 870 8 0 0 0 0 272 0 0 0 04 0 0 38:30 AM 0 7 110 0 0 860 7 0 0 0 0 222 0 0 0 07 0 0 58:45 AM 0 4 106 0 0 830 0 0 0 0 0 203 0 0 0 08 0 0 2Vehicle TypeLeftThruRightEastboundU-TurnWestboundNorthboundSouthboundTotalLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-TurnArticulated Trucks 0 6 0 0 1 00 0 0 0 0 0 70 0 0 0Lights 5 621 0 0 354 1031 0 19 0 0 0 1,0400 0 0 0Mediums 0 9 0 0 14 00 0 0 0 0 0 230 0 0 0Total31 0 19 0 0 0 5 636 0 0 369 10 1,0700 0 0 0LeftThruRightTotalEastboundU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn0.0% 0.0% 0.9% 0.0% 0.0% 0.3%0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.7%0.0% 0.0% 0.0% 0.0%Heavy Vehicle %Heavy Vehicle %Peak Hour FactorPeak Hour Factor0.0% 0.0% 0.9% 0.3% 0.7%0.970.83 0.00 0.94 0.91 0.970.00 0.46 0.94 0.00 0.00 0.900.00 0.67 0.00 0.00 0.00 0.000.81 0.00 0.00 0.60
Page 66 of 205
BARBERVILLE RD STOCK LNSC 160SC 160(303) 216-2439www.alltrafficdata.netLocation:2 BARBERVILLE RD & SC 160 AMWednesday, May 3, 2023Date:
Peak Rolling Hour Flow Rates
Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - PedestriansTraffic Counts - Motorized VehiclesNote: Total study counts contained in parentheses.Peak Hour:07:30 AM - 08:30 AMPeak 15-Minutes:08:15 AM - 08:30 AM
Heavy Vehicle Percentage and Peak Hour Factor
385 645685883001,2848260.97NSEW0.840.910.250.96(1,118)(702)(1,373)(1,594)(1,616)(2,253)(1)(1)2610124120565007595250000000SC 160SC 160BARBERVILLE RDSTOCK LN
0000NSEW00000000
0000NSEW00000000LeftThruRightTotalEastboundIntervalStart TimeRollingHourWest East South NorthPedestrian CrossingsU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn7:00 AM 0 0 0 0 12 00 84 107 0 0 126 398 0 0 0 02,0661 29 0 397:15 AM 0 1 0 0 23 00 112 137 0 0 153 506 0 0 0 02,2540 25 0 557:30 AM 0 0 0 0 29 00 141 169 0 0 137 568 0 0 0 02,3540 31 0 617:45 AM 0 0 0 0 36 00 111 206 0 0 156 594 0 0 0 02,3070 27 0 588:00 AM 0 0 0 0 40 00 140 183 0 0 124 586 0 0 0 02,2630 21 0 788:15 AM 0 0 0 0 19 00 133 201 0 0 148 606 0 0 0 00 41 0 648:30 AM 0 0 0 0 40 00 92 161 0 0 145 521 0 0 0 00 23 0 608:45 AM 0 0 0 0 29 00 73 202 0 0 152 550 0 0 0 00 35 0 59Vehicle TypeLeftThruRightEastboundU-TurnWestboundNorthboundSouthboundTotalLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-TurnArticulated Trucks 0 0 0 0 0 15 6 0 0 7 0 190 0 0 0Lights 0 0 0 118 0 252517 746 0 0 543 114 2,2900 0 0 0Mediums 0 0 0 6 0 83 7 0 0 15 6 450 0 0 0Total525 759 0 0 565 120 0 0 0 124 0 261 2,3540 0 0 0LeftThruRightTotalEastboundU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn0.0% 0.0% 0.0% 0.0% 0.0% 0.0%0.0% 1.0% 0.8% 0.0% 0.0% 1.2% 0.8%0.0% 0.0% 0.0% 0.4%Heavy Vehicle %Heavy Vehicle %Peak Hour FactorPeak Hour Factor0.9% 1.0% 0.0% 0.3% 0.8%0.970.96 0.91 0.25 0.84 0.970.00 0.25 0.00 0.00 0.84 0.000.00 0.93 0.92 0.00 0.00 0.920.25 0.73 0.00 0.84
Page 67 of 205
BARBERVILLE RD BARBERVILLE RDHARBOR BAY DRHARBOR BAY DR(303) 216-2439www.alltrafficdata.netLocation:1 BARBERVILLE RD & HARBOR BAY DR PMWednesday, May 3, 2023Date:
Peak Rolling Hour Flow Rates
Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - PedestriansTraffic Counts - Motorized VehiclesNote: Total study counts contained in parentheses.Peak Hour:05:00 PM - 06:00 PMPeak 15-Minutes:05:45 PM - 06:00 PM
Heavy Vehicle Percentage and Peak Hour Factor
499 4890051151732360.88NSEW0.890.000.790.73(880)(940)()()(76)(56)(913)(953)50000022010004943147901HARBOR BAY DRHARBOR BAY DRBARBERVILLE RDBARBERVILLE RD
0000NSEW00000000
0000NSEW00000000LeftThruRightTotalEastboundIntervalStart TimeRollingHourWest East South NorthPedestrian CrossingsU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn4:00 PM 0 4 83 0 0 830 1 0 0 0 0 179 0 0 0 08674 0 0 44:15 PM 0 10 103 0 0 1140 3 0 0 0 0 239 0 0 0 09397 0 0 24:30 PM 0 4 98 0 0 840 4 0 0 0 0 200 0 0 0 09432 0 0 84:45 PM 0 2 98 0 0 1400 1 0 0 0 0 249 0 0 0 09962 0 0 65:00 PM 0 7 96 0 0 1370 3 0 0 0 0 251 0 0 0 01,0426 0 0 25:15 PM 0 8 115 0 0 1080 2 0 0 0 0 243 0 0 0 09 0 0 15:30 PM 1 7 116 0 0 1230 4 0 0 0 0 253 0 0 0 01 0 0 15:45 PM 0 9 152 0 0 1260 1 0 0 0 0 295 0 0 0 06 0 0 1Vehicle TypeLeftThruRightEastboundU-TurnWestboundNorthboundSouthboundTotalLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-TurnArticulated Trucks 0 1 0 0 2 00 0 0 0 0 0 30 0 0 0Lights 31 472 0 0 483 510 0 20 0 0 0 1,0220 0 1 0Mediums 0 6 0 0 9 00 0 2 0 0 0 170 0 0 0Total10 0 22 0 0 0 31 479 0 0 494 5 1,0420 0 1 0LeftThruRightTotalEastboundU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn0.0% 0.0% 0.2% 0.0% 0.0% 0.4%0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.3%0.0% 0.0% 0.0% 0.0%Heavy Vehicle %Heavy Vehicle %Peak Hour FactorPeak Hour Factor0.0% 0.0% 0.2% 0.4% 0.3%0.880.73 0.00 0.79 0.89 0.880.25 0.86 0.79 0.00 0.00 0.910.00 0.69 0.00 0.00 0.00 0.000.61 0.00 0.00 0.63
Page 68 of 205
BARBERVILLE RD STOCK LNSC 160SC 160(303) 216-2439www.alltrafficdata.netLocation:2 BARBERVILLE RD & SC 160 PMWednesday, May 3, 2023Date:
Peak Rolling Hour Flow Rates
Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - PedestriansTraffic Counts - Motorized VehiclesNote: Total study counts contained in parentheses.Peak Hour:05:00 PM - 06:00 PMPeak 15-Minutes:05:45 PM - 06:00 PM
Heavy Vehicle Percentage and Peak Hour Factor
511 5148971,151101,0978410.95NSEW0.960.880.500.97(917)(951)(1,738)(2,006)(1,899)(2,131)(3)(1)1450366202695007853120001000SC 160SC 160BARBERVILLE RDSTOCK LN
0000NSEW00000000
0000NSEW00000000LeftThruRightTotalEastboundIntervalStart TimeRollingHourWest East South NorthPedestrian CrossingsU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn4:00 PM 0 1 0 0 23 00 71 178 0 0 166 535 0 0 0 02,3171 24 0 714:15 PM 0 0 1 0 22 00 70 193 0 0 196 597 0 0 0 02,3660 32 0 834:30 PM 0 0 0 0 30 00 78 180 0 0 157 551 0 0 0 02,4130 31 0 754:45 PM 0 0 0 0 31 00 65 198 0 0 204 634 0 0 0 02,4780 31 0 1055:00 PM 0 0 0 0 71 00 75 183 0 0 166 584 0 0 0 02,5060 35 0 545:15 PM 0 0 0 0 96 00 70 209 0 0 190 644 0 0 0 00 48 0 315:30 PM 0 1 0 0 104 00 84 194 0 0 158 616 0 0 0 00 45 0 305:45 PM 0 0 0 0 95 00 83 199 0 0 181 662 0 0 0 00 74 0 30Vehicle TypeLeftThruRightEastboundU-TurnWestboundNorthboundSouthboundTotalLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-TurnArticulated Trucks 0 0 0 1 0 11 3 0 0 4 0 100 0 0 0Lights 1 0 0 358 0 143308 775 0 0 687 200 2,4720 0 0 0Mediums 0 0 0 7 0 13 7 0 0 4 2 240 0 0 0Total312 785 0 0 695 202 1 0 0 366 0 145 2,5060 0 0 0LeftThruRightTotalEastboundU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn0.0% 0.0% 0.0% 0.0% 0.3% 0.0%0.0% 0.3% 0.4% 0.0% 0.0% 0.6% 0.4%0.0% 0.0% 0.0% 0.7%Heavy Vehicle %Heavy Vehicle %Peak Hour FactorPeak Hour Factor0.4% 0.4% 0.0% 0.4% 0.4%0.950.97 0.88 0.50 0.96 0.950.00 0.25 0.25 0.00 0.88 0.000.00 0.93 0.94 0.00 0.00 0.890.25 0.68 0.00 0.80
Page 69 of 205
APPENDIX C
Traffic Volume Development Worksheets and ITE Trip
Generation Worksheets
Page 70 of 205
TRAFFIC CONTROL:
DATE COUNTED:
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
525 759 0 0 565 120 0 0 0 124 0 261
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
3 3 3 3 3 3 3 3 3 3 3 3
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
16 23 0 0 17 4 0 0 0 4 0 8
0 13 38 13 4 0
10 8 8 29
1 1 3 3
4 2 6 11
7 3 10 20
26 13
22 39 51 27 31 63
573 821 0 0 633 159 0 0 0 167 0 361
50% 20%
20% 50%
41 16
12 31
41 16 12 31
614 821 0 0 633 175 0 0 0 179 0 392
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
312 785 0 0 695 202 1 0 0 366 0 145
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
3 3 3 3 3 3 3 3 3 3 3 3
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
9 24 0 0 21 6 0 0 0 11 0 4
0 39 24 8 13 0
32 3 5 19
3 3 1 2
13 6 4 7
23 11 7 12
17 9
71 56 33 31 30 40
424 865 0 0 749 242 1 0 0 412 0 208
50% 20%
20% 50%
53 20
23 58
53 20 23 58
477 865 0 0 749 262 1 0 0 435 0 266
Vested Trips (Redwood)
Vested Trips (Pettus Pond)
Vested Trips (The Lodges)
Vested Trips (The Lodges)
Inbound Trip Distribution Percentage
Outbound Trip Distribution Percentage
PM PEAK HOUR (5:00-6:00 PM)
2023 TRAFFIC VOLUMES
Vested Trips (Patterson Lane Appartments)
Years To Buildout (2026)
Yearly Growth Rate
Background Traffic Growth
Vested Trips (Sugar Creek)
Vested Trips (Patterson Preserve)
Heavy Vehicle Percentage
2026 NO-BUILD TRAFFIC VOLUMES
Inbound New Project Traffic
Outbound New Project Traffic
Total New Project Traffic
2026 BUILD TRAFFIC VOLUMES
Inbound Trip Distribution Percentage
Outbound Trip Distribution Percentage
Pass-By Project Traffic
Background Traffic Growth
Vested Trips (Patterson Preserve)
Vested Trips (Patterson Lane Appartments)
Vested Traffic Volumes
Vested Trips (Sugar Creek)
Vested Trips (Redwood)
Vested Trips (Pettus Pond)
INTERSECTION TRAFFIC VOLUME DEVELOPMENT
Fort Mill Highway & Barberville Road
Signalized
Wednesday, May 3, 2023
AM PEAK HOUR (7:30-8:30 AM)
Total New Project Traffic
Pass-by Project Traffic
2026 BUILD TRAFFIC VOLUMES
Vested Traffic Volumes
2026 NO-BUILD TRAFFIC VOLUMES
Inbound New Project Traffic
Outbound New Project Traffic
Yearly Growth Rate
Years To Buildout (2026)
2023 TRAFFIC VOLUMES
Heavy Vehicle Percentage
Page 71 of 205
TRAFFIC CONTROL:
DATE COUNTED:
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
31 0 19 0 0 0 5 636 0 0 369 10
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
3 3 3 3 3 3 3 3 3 3 3 3
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
1 0 1 0 0 0 0 19 0 0 11 0
13 4
18 37
2 6
6 17
10 30
0 0
49 94
32 0 20 0 0 0 5 722 0 0 511 10
30%
30%
25
18
18 25
32 0 20 0 0 0 5 740 0 0 536 10
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
10 0 22 0 0 0 32 479 0 0 494 5
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
3 3 3 3 3 3 3 3 3 3 3 3
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
0 0 1 0 0 0 1 14 0 0 15 0
8 13
35 24
6 3
19 11
34 19
0 0
102 70
10 0 23 0 0 0 33 630 0 0 603 5
30%
30%
32
35
35 32
10 0 23 0 0 0 33 665 0 0 635 5
Vested Trips (The Lodges)
Vested Trips (The Lodges)
INTERSECTION TRAFFIC VOLUME DEVELOPMENT
Barberville Road & Harbor Bay Drive
Unsignalized
Wednesday, May 3, 2023
AM PEAK HOUR (7:30-8:30 AM)
2023 TRAFFIC VOLUMES
Heavy Vehicle Percentage
Years To Buildout (2026)
Yearly Growth Rate
Pass-By Project Traffic
Background Traffic Growth
Vested Trips (Sugar Creek)
Vested Trips (Patterson Preserve)
Vested Trips (Patterson Lane Appartments)
Vested Traffic Volumes
2026 NO-BUILD TRAFFIC VOLUMES
Inbound Trip Distribution Percentage
Outbound Trip Distribution Percentage
Inbound New Project Traffic
Outbound New Project Traffic
Vested Trips (Redwood)
Vested Trips (Pettus Pond)
Total New Project Traffic
2026 BUILD TRAFFIC VOLUMES
PM PEAK HOUR (5:00-6:00 PM)
2023 TRAFFIC VOLUMES
Background Traffic Growth
Heavy Vehicle Percentage
Years To Buildout (2026)
Yearly Growth Rate
2026 BUILD TRAFFIC VOLUMES
Vested Trips (Sugar Creek)
Vested Trips (Patterson Preserve)
Vested Trips (Patterson Lane Appartments)
Vested Traffic Volumes
2026 NO-BUILD TRAFFIC VOLUMES
Inbound Trip Distribution Percentage
Outbound Trip Distribution Percentage
Inbound New Project Traffic
Outbound New Project Traffic
Pass-by Project Traffic
Total New Project Traffic
Vested Trips (Redwood)
Vested Trips (Pettus Pond)
Page 72 of 205
TRAFFIC CONTROL:
DATE COUNTED:
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
0 0 0 0 0 0 0 641 0 0 388 0
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
3 3 3 3 3 3 3 3 3 3 3 3
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
0 0 0 0 0 0 0 19 0 0 12 0
13 4
18 37
2 6
6 17
10 30
0 0
49 94
0 0 0 0 0 0 0 727 0 0 531 0
70% 30%
30% 70%
57 25
18 43
18 43 57 25
18 0 43 0 0 0 57 727 0 0 531 25
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
0 0 0 0 0 0 0 511 0 0 516 0
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
3 3 3 3 3 3 3 3 3 3 3 3
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
0 0 0 0 0 0 0 15 0 0 15 0
8 13
35 24
6 3
19 11
34 19
0 0
102 70
0 0 0 0 0 0 0 663 0 0 625 0
70% 30%
30% 70%
73 32
35 81
35 81 73 32
35 0 81 0 0 0 73 663 0 0 625 32
Vested Trips (The Lodges)
Vested Trips (The Lodges)
INTERSECTION TRAFFIC VOLUME DEVELOPMENT
Barberville Road & Fortson Road/ Site Access
Unsignalized
AM PEAK HOUR (7:30-8:30 AM)
2023 TRAFFIC VOLUMES
Heavy Vehicle Percentage
Years To Buildout (2026)
Yearly Growth Rate
Pass-By Project Traffic
Background Traffic Growth
Vested Trips (Sugar Creek)
Vested Trips (Patterson Preserve)
Vested Trips (Patterson Lane Appartments)
Vested Traffic Volumes
2026 NO-BUILD TRAFFIC VOLUMES
Inbound Trip Distribution Percentage
Outbound Trip Distribution Percentage
Inbound New Project Traffic
Outbound New Project Traffic
Vested Trips (Redwood)
Vested Trips (Pettus Pond)
Total New Project Traffic
2026 BUILD TRAFFIC VOLUMES
PM PEAK HOUR (5:00-6:00 PM)
2023 TRAFFIC VOLUMES
Background Traffic Growth
Heavy Vehicle Percentage
Years To Buildout (2026)
Yearly Growth Rate
2026 BUILD TRAFFIC VOLUMES
Vested Trips (Sugar Creek)
Vested Trips (Patterson Preserve)
Vested Trips (Patterson Lane Appartments)
Vested Traffic Volumes
2026 NO-BUILD TRAFFIC VOLUMES
Inbound Trip Distribution Percentage
Outbound Trip Distribution Percentage
Inbound New Project Traffic
Outbound New Project Traffic
Pass-by Project Traffic
Total New Project Traffic
Vested Trips (Redwood)
Vested Trips (Pettus Pond)
Page 73 of 205
Page 74 of 205
Page 75 of 205
Page 76 of 205
Page 77 of 205
Page 78 of 205
Page 79 of 205
Page 80 of 205
Page 81 of 205
Page 82 of 205
APPENDIX D
Turn Lane Analysis Worksheets
Page 83 of 205
INTERSECTION: Barberville Road & Site Access
MOVEMENT: Northbound left turn
SCENARIO Advancing Volume
(Va)
Northbound left
turn
Opposing Volume
(Vo) Left Turn % of Va Symbol
AM Build 784 57 556 7.3%
PM Build 736 73 657 9.9%
.
Barberville Road TIS
LEFT-TURN LANE WARRANT REVIEW
AM BuildPM Build
`
`
Page 84 of 205
INTERSECTION: Barberville Road & Site Access
MOVEMENT: Southbound right turn
SCENARIO Design Hour
Volume Right Turn Volume Symbol
AM Build 556 25
PM Build 657 32
Barberville Road TIS
RIGHT-TURN LANE WARRANT REVIEW
`
AMBuildPMBuild
Page 85 of 205
APPENDIX E
Capacity Analysis
Page 86 of 205
2023 Existing Conditions
Page 87 of 205
HCM 6th Signalized Intersection Summary Barberville Road TIS
100: Fort Mill Highway & Barberville Road 2023 Existing AM
RKA Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 525 759 0 0 565 120 0 0 0 124 0 261
Future Volume (veh/h) 525 759 0 0 565 120 0 0 0 124 0 261
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847
Adj Flow Rate, veh/h 571 825 0 0 614 130 0 0 0 135 0 284
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 540 1367 0 0 763 918 0 2 0 316 0 282
Arrive On Green 0.18 0.67 0.00 0.00 0.43 0.43 0.00 0.00 0.00 0.18 0.00 0.18
Sat Flow, veh/h 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565
Grp Volume(v), veh/h 571 825 0 0 614 130 0 0 0 135 0 284
Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565
Q Serve(g_s), s 14.9 18.3 0.0 0.0 24.6 3.0 0.0 0.0 0.0 5.6 0.0 14.7
Cycle Q Clear(g_c), s 14.9 18.3 0.0 0.0 24.6 3.0 0.0 0.0 0.0 5.6 0.0 14.7
Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 540 1367 0 0 763 918 0 2 0 316 0 282
V/C Ratio(X) 1.06 0.60 0.00 0.00 0.80 0.14 0.00 0.00 0.00 0.43 0.00 1.01
Avail Cap(c_a), veh/h 540 1697 0 0 1052 1162 0 470 0 316 0 282
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 19.5 7.3 0.0 0.0 20.3 6.8 0.0 0.0 0.0 29.8 0.0 33.5
Incr Delay (d2), s/veh 54.9 0.3 0.0 0.0 2.8 0.1 0.0 0.0 0.0 0.9 0.0 55.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 13.6 5.4 0.0 0.0 9.4 1.3 0.0 0.0 0.0 2.3 0.0 9.6
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 74.4 7.6 0.0 0.0 23.1 6.9 0.0 0.0 0.0 30.7 0.0 89.3
LnGrp LOS F A A A C A A A A C A F
Approach Vol, veh/h 1396 744 0 419
Approach Delay, s/veh 34.9 20.3 0.0 70.4
Approach LOS C C E
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 61.7 0.0 20.0 41.7 20.0
Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3
Max Green Setting (Gmax), s * 68 * 20 14.9 * 48 14.7
Max Q Clear Time (g_c+I1), s 20.3 0.0 16.9 26.6 16.7
Green Ext Time (p_c), s 21.2 0.0 0.0 8.5 0.0
Intersection Summary
HCM 6th Ctrl Delay 36.5
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Page 88 of 205
HCM 6th TWSC Barberville Road TIS
200: Barberville Road & Harbor Bay Drive 2023 Existing AM
RKA Synchro 11 Report
Intersection
Int Delay, s/veh 1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 31 19 5 636 369 10
Future Vol, veh/h 31 19 5 636 369 10
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 34 21 5 691 401 11
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1108 407 412 0 - 0
Stage 1 407 - - - - -
Stage 2 701 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 232 644 1147 - - -
Stage 1 672 - - - - -
Stage 2 492 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 230 644 1147 - - -
Mov Cap-2 Maneuver 230 - - - - -
Stage 1 667 - - - - -
Stage 2 492 - - - - -
Approach EB NB SB
HCM Control Delay, s 19.4 0.1 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1147 - 304 - -
HCM Lane V/C Ratio 0.005 - 0.179 - -
HCM Control Delay (s) 8.2 0 19.4 - -
HCM Lane LOS A A C - -
HCM 95th %tile Q(veh) 0 - 0.6 - -
Page 89 of 205
HCM 6th Signalized Intersection Summary Barberville Road TIS
100: Fort Mill Highway & Barberville Road 2023 Existing PM
RKA Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 312 785 0 0 695 202 1 0 0 366 0 145
Future Volume (veh/h) 312 785 0 0 695 202 1 0 0 366 0 145
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847
Adj Flow Rate, veh/h 339 853 0 0 755 220 1 0 0 398 0 158
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 381 1335 0 0 843 950 4 0 0 275 0 245
Arrive On Green 0.13 0.66 0.00 0.00 0.47 0.47 0.00 0.00 0.00 0.16 0.00 0.16
Sat Flow, veh/h 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565
Grp Volume(v), veh/h 339 853 0 0 755 220 1 0 0 398 0 158
Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565
Q Serve(g_s), s 9.7 23.3 0.0 0.0 36.5 5.9 0.1 0.0 0.0 14.7 0.0 8.9
Cycle Q Clear(g_c), s 9.7 23.3 0.0 0.0 36.5 5.9 0.1 0.0 0.0 14.7 0.0 8.9
Prop In Lane 1.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 381 1335 0 0 843 950 4 0 0 275 0 245
V/C Ratio(X) 0.89 0.64 0.00 0.00 0.90 0.23 0.25 0.00 0.00 1.45 0.00 0.65
Avail Cap(c_a), veh/h 436 1474 0 0 914 1009 389 0 0 275 0 245
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 23.8 9.5 0.0 0.0 22.6 7.5 46.9 0.0 0.0 39.7 0.0 37.3
Incr Delay (d2), s/veh 18.1 0.7 0.0 0.0 10.6 0.1 28.7 0.0 0.0 221.0 0.0 5.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.7 8.2 0.0 0.0 15.9 2.6 0.1 0.0 0.0 23.0 0.0 3.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 41.9 10.2 0.0 0.0 33.2 7.6 75.5 0.0 0.0 260.7 0.0 43.0
LnGrp LOS D B A A C A E A A F A D
Approach Vol, veh/h 1192 975 1 556
Approach Delay, s/veh 19.2 27.4 75.5 198.9
Approach LOS B C E F
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 68.6 5.5 17.3 51.3 20.0
Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3
Max Green Setting (Gmax), s * 68 * 20 14.9 * 48 14.7
Max Q Clear Time (g_c+I1), s 25.3 2.1 11.7 38.5 16.7
Green Ext Time (p_c), s 21.2 0.0 0.5 6.1 0.0
Intersection Summary
HCM 6th Ctrl Delay 58.8
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Page 90 of 205
HCM 6th TWSC Barberville Road TIS
200: Barberville Road & Harbor Bay Drive 2023 Existing PM
RKA Synchro 11 Report
Intersection
Int Delay, s/veh 0.7
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 22 32 479 494 5
Future Vol, veh/h 10 22 32 479 494 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 11 24 35 521 537 5
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1131 540 542 0 - 0
Stage 1 540 - - - - -
Stage 2 591 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 225 542 1027 - - -
Stage 1 584 - - - - -
Stage 2 553 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 214 542 1027 - - -
Mov Cap-2 Maneuver 214 - - - - -
Stage 1 556 - - - - -
Stage 2 553 - - - - -
Approach EB NB SB
HCM Control Delay, s 15.9 0.5 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1027 - 366 - -
HCM Lane V/C Ratio 0.034 - 0.095 - -
HCM Control Delay (s) 8.6 0 15.9 - -
HCM Lane LOS A A C - -
HCM 95th %tile Q(veh) 0.1 - 0.3 - -
Page 91 of 205
2026 No-Build Conditions
Page 92 of 205
HCM 6th Signalized Intersection Summary Barberville Road TIS
100: Fort Mill Highway & Barberville Road 2026 No- Build AM
RKA Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 573 821 0 0 633 159 0 0 0 167 0 361
Future Volume (veh/h) 573 821 0 0 633 159 0 0 0 167 0 361
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847
Adj Flow Rate, veh/h 623 892 0 0 688 173 0 0 0 182 0 392
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 525 1341 0 0 672 929 0 2 0 421 0 374
Arrive On Green 0.24 0.66 0.00 0.00 0.38 0.38 0.00 0.00 0.00 0.24 0.00 0.24
Sat Flow, veh/h 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565
Grp Volume(v), veh/h 623 892 0 0 688 173 0 0 0 182 0 392
Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565
Q Serve(g_s), s 28.9 31.9 0.0 0.0 45.4 6.0 0.0 0.0 0.0 10.5 0.0 28.7
Cycle Q Clear(g_c), s 28.9 31.9 0.0 0.0 45.4 6.0 0.0 0.0 0.0 10.5 0.0 28.7
Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 525 1341 0 0 672 929 0 2 0 421 0 374
V/C Ratio(X) 1.19 0.66 0.00 0.00 1.02 0.19 0.00 0.00 0.00 0.43 0.00 1.05
Avail Cap(c_a), veh/h 525 1341 0 0 672 929 0 141 0 421 0 374
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 38.9 12.3 0.0 0.0 37.3 9.9 0.0 0.0 0.0 38.7 0.0 45.7
Incr Delay (d2), s/veh 102.0 2.6 0.0 0.0 40.9 0.4 0.0 0.0 0.0 0.7 0.0 59.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 29.0 13.3 0.0 0.0 26.2 3.5 0.0 0.0 0.0 4.5 0.0 17.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 140.9 14.9 0.0 0.0 78.2 10.4 0.0 0.0 0.0 39.4 0.0 105.1
LnGrp LOS F B A A F B A A A D A F
Approach Vol, veh/h 1515 861 0 574
Approach Delay, s/veh 66.7 64.6 0.0 84.3
Approach LOS E E F
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 86.0 34.0 34.0 52.0 0.0
Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3
Max Green Setting (Gmax), s * 65 * 29 28.9 * 31 8.7
Max Q Clear Time (g_c+I1), s 33.9 30.7 30.9 47.4 0.0
Green Ext Time (p_c), s 18.7 0.0 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 69.5
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Page 93 of 205
HCM 6th TWSC Barberville Road TIS
200: Barberville Road & Harbor Bay Drive 2026 No- Build AM
RKA Synchro 11 Report
Intersection
Int Delay, s/veh 1.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 32 20 5 722 511 10
Future Vol, veh/h 32 20 5 722 511 10
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 35 22 5 785 555 11
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1356 561 566 0 - 0
Stage 1 561 - - - - -
Stage 2 795 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 165 527 1006 - - -
Stage 1 571 - - - - -
Stage 2 445 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 164 527 1006 - - -
Mov Cap-2 Maneuver 164 - - - - -
Stage 1 566 - - - - -
Stage 2 445 - - - - -
Approach EB NB SB
HCM Control Delay, s 26.5 0.1 0
HCM LOS D
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1006 - 223 - -
HCM Lane V/C Ratio 0.005 - 0.253 - -
HCM Control Delay (s) 8.6 0 26.5 - -
HCM Lane LOS A A D - -
HCM 95th %tile Q(veh) 0 - 1 - -
Page 94 of 205
HCM 6th Signalized Intersection Summary Barberville Road TIS
100: Fort Mill Highway & Barberville Road 2026 No- Build PM
RKA Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 424 865 0 0 749 242 1 0 0 412 0 208
Future Volume (veh/h) 424 865 0 0 749 242 1 0 0 412 0 208
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847
Adj Flow Rate, veh/h 461 940 0 0 814 263 1 0 0 448 0 226
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 493 1247 0 0 619 885 4 0 0 421 0 374
Arrive On Green 0.22 0.62 0.00 0.00 0.35 0.35 0.00 0.00 0.00 0.24 0.00 0.24
Sat Flow, veh/h 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565
Grp Volume(v), veh/h 461 940 0 0 814 263 1 0 0 448 0 226
Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565
Q Serve(g_s), s 24.3 39.9 0.0 0.0 41.8 10.5 0.1 0.0 0.0 28.7 0.0 15.4
Cycle Q Clear(g_c), s 24.3 39.9 0.0 0.0 41.8 10.5 0.1 0.0 0.0 28.7 0.0 15.4
Prop In Lane 1.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 493 1247 0 0 619 885 4 0 0 421 0 374
V/C Ratio(X) 0.93 0.75 0.00 0.00 1.32 0.30 0.25 0.00 0.00 1.06 0.00 0.60
Avail Cap(c_a), veh/h 525 1247 0 0 619 885 135 0 0 421 0 374
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 37.5 16.6 0.0 0.0 39.1 12.4 59.8 0.0 0.0 45.7 0.0 40.6
Incr Delay (d2), s/veh 23.5 4.2 0.0 0.0 153.1 0.9 28.9 0.0 0.0 62.2 0.0 2.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 16.1 17.7 0.0 0.0 43.5 6.0 0.1 0.0 0.0 19.4 0.0 6.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 61.0 20.8 0.0 0.0 192.1 13.2 88.7 0.0 0.0 107.9 0.0 43.3
LnGrp LOS E C A A F B F A A F A D
Approach Vol, veh/h 1401 1077 1 674
Approach Delay, s/veh 34.0 148.5 88.7 86.2
Approach LOS C F F F
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 80.4 34.0 32.0 48.4 5.6
Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3
Max Green Setting (Gmax), s * 65 * 29 28.9 * 31 8.7
Max Q Clear Time (g_c+I1), s 41.9 30.7 26.3 43.8 2.1
Green Ext Time (p_c), s 16.2 0.0 0.6 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 84.3
HCM 6th LOS F
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Page 95 of 205
HCM 6th TWSC Barberville Road TIS
200: Barberville Road & Harbor Bay Drive 2026 No- Build PM
RKA Synchro 11 Report
Intersection
Int Delay, s/veh 0.7
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 23 33 630 603 5
Future Vol, veh/h 10 23 33 630 603 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 11 25 36 685 655 5
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1415 658 660 0 - 0
Stage 1 658 - - - - -
Stage 2 757 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 151 464 928 - - -
Stage 1 515 - - - - -
Stage 2 463 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 141 464 928 - - -
Mov Cap-2 Maneuver 141 - - - - -
Stage 1 483 - - - - -
Stage 2 463 - - - - -
Approach EB NB SB
HCM Control Delay, s 20.1 0.4 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 928 - 274 - -
HCM Lane V/C Ratio 0.039 - 0.131 - -
HCM Control Delay (s) 9 0 20.1 - -
HCM Lane LOS A A C - -
HCM 95th %tile Q(veh) 0.1 - 0.4 - -
Page 96 of 205
2026 Build Conditions
Page 97 of 205
HCM 6th Signalized Intersection Summary Barberville Road TIS
100: Fort Mill Highway & Barberville Road 2026 Build AM
RKA Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 582 782 0 0 582 140 0 0 0 140 0 300
Future Volume (veh/h) 582 782 0 0 582 140 0 0 0 140 0 300
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847
Adj Flow Rate, veh/h 633 850 0 0 633 152 0 0 0 152 0 326
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 520 1324 0 0 691 586 0 439 0 469 0 353
Arrive On Green 0.21 0.65 0.00 0.00 0.39 0.39 0.00 0.00 0.00 0.23 0.00 0.23
Sat Flow, veh/h 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565
Grp Volume(v), veh/h 633 850 0 0 633 152 0 0 0 152 0 326
Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565
Q Serve(g_s), s 20.9 24.7 0.0 0.0 33.3 6.8 0.0 0.0 0.0 7.2 0.0 20.1
Cycle Q Clear(g_c), s 20.9 24.7 0.0 0.0 33.3 6.8 0.0 0.0 0.0 7.2 0.0 20.1
Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 520 1324 0 0 691 586 0 439 0 469 0 353
V/C Ratio(X) 1.22 0.64 0.00 0.00 0.92 0.26 0.00 0.00 0.00 0.32 0.00 0.92
Avail Cap(c_a), veh/h 520 1366 0 0 728 617 0 439 0 478 0 360
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 28.5 10.2 0.0 0.0 28.6 20.5 0.0 0.0 0.0 32.4 0.0 37.4
Incr Delay (d2), s/veh 114.0 0.9 0.0 0.0 15.7 0.2 0.0 0.0 0.0 0.4 0.0 28.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 28.2 9.1 0.0 0.0 16.0 2.3 0.0 0.0 0.0 3.0 0.0 10.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 142.4 11.1 0.0 0.0 44.2 20.6 0.0 0.0 0.0 32.8 0.0 66.1
LnGrp LOS F B A A D C A A A C A E
Approach Vol, veh/h 1483 785 0 478
Approach Delay, s/veh 67.2 39.7 0.0 55.5
Approach LOS E D E
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 71.0 27.6 26.0 45.0 27.6
Change Period (Y+Rc), s * 6.6 * 5.4 5.1 * 6.6 5.4
Max Green Setting (Gmax), s * 66 * 23 20.9 * 40 8.6
Max Q Clear Time (g_c+I1), s 26.7 22.1 22.9 35.3 0.0
Green Ext Time (p_c), s 20.2 0.1 0.0 3.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 57.3
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Page 98 of 205
HCM 6th TWSC Barberville Road TIS
200: Barberville Road & Harbor Bay Drive 2026 Build AM
RKA Synchro 11 Report
Intersection
Int Delay, s/veh 1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 32 20 5 673 405 10
Future Vol, veh/h 32 20 5 673 405 10
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 35 22 5 732 440 11
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1188 446 451 0 - 0
Stage 1 446 - - - - -
Stage 2 742 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 208 612 1109 - - -
Stage 1 645 - - - - -
Stage 2 471 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 206 612 1109 - - -
Mov Cap-2 Maneuver 206 - - - - -
Stage 1 640 - - - - -
Stage 2 471 - - - - -
Approach EB NB SB
HCM Control Delay, s 21.3 0.1 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1109 - 277 - -
HCM Lane V/C Ratio 0.005 - 0.204 - -
HCM Control Delay (s) 8.3 0 21.3 - -
HCM Lane LOS A A C - -
HCM 95th %tile Q(veh) 0 - 0.7 - -
Page 99 of 205
HCM 6th TWSC Barberville Road TIS
300: Barberville Road & Site Access 2026 Build AM
RKA Synchro 11 Report
Intersection
Int Delay, s/veh 1.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 43 57 714 527 25
Future Vol, veh/h 18 43 57 714 527 25
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 50 0 150 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 20 47 62 776 573 27
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1487 587 600 0 - 0
Stage 1 587 - - - - -
Stage 2 900 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 137 510 977 - - -
Stage 1 556 - - - - -
Stage 2 397 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 128 510 977 - - -
Mov Cap-2 Maneuver 128 - - - - -
Stage 1 521 - - - - -
Stage 2 397 - - - - -
Approach EB NB SB
HCM Control Delay, s 20.3 0.7 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity (veh/h) 977 - 128 510 - -
HCM Lane V/C Ratio 0.063 - 0.153 0.092 - -
HCM Control Delay (s) 8.9 - 38.1 12.8 - -
HCM Lane LOS A - E B - -
HCM 95th %tile Q(veh) 0.2 - 0.5 0.3 - -
Page 100 of 205
HCM 6th Signalized Intersection Summary Barberville Road TIS
100: Fort Mill Highway & Barberville Road 2026 Build PM
RKA Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 477 865 0 0 749 262 1 0 0 435 0 266
Future Volume (veh/h) 477 865 0 0 749 262 1 0 0 435 0 266
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847
Adj Flow Rate, veh/h 518 940 0 0 814 285 1 0 0 473 0 289
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 525 1247 0 0 590 860 4 0 0 421 0 374
Arrive On Green 0.24 0.62 0.00 0.00 0.33 0.33 0.00 0.00 0.00 0.24 0.00 0.24
Sat Flow, veh/h 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565
Grp Volume(v), veh/h 518 940 0 0 814 285 1 0 0 473 0 289
Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565
Q Serve(g_s), s 28.3 39.9 0.0 0.0 39.8 12.0 0.1 0.0 0.0 28.7 0.0 20.7
Cycle Q Clear(g_c), s 28.3 39.9 0.0 0.0 39.8 12.0 0.1 0.0 0.0 28.7 0.0 20.7
Prop In Lane 1.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 525 1247 0 0 590 860 4 0 0 421 0 374
V/C Ratio(X) 0.99 0.75 0.00 0.00 1.38 0.33 0.25 0.00 0.00 1.12 0.00 0.77
Avail Cap(c_a), veh/h 525 1247 0 0 590 860 135 0 0 421 0 374
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 38.0 16.6 0.0 0.0 40.1 13.6 59.8 0.0 0.0 45.7 0.0 42.6
Incr Delay (d2), s/veh 35.7 4.2 0.0 0.0 181.7 1.0 28.9 0.0 0.0 82.3 0.0 9.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 19.9 17.7 0.0 0.0 46.2 6.8 0.1 0.0 0.0 21.8 0.0 8.8
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 73.7 20.8 0.0 0.0 221.7 14.6 88.7 0.0 0.0 127.9 0.0 52.2
LnGrp LOS E C A A F B F A A F A D
Approach Vol, veh/h 1458 1099 1 762
Approach Delay, s/veh 39.6 168.0 88.7 99.2
Approach LOS D F F F
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 80.4 34.0 34.0 46.4 5.6
Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3
Max Green Setting (Gmax), s * 65 * 29 28.9 * 31 8.7
Max Q Clear Time (g_c+I1), s 41.9 30.7 30.3 41.8 2.1
Green Ext Time (p_c), s 16.2 0.0 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 95.8
HCM 6th LOS F
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Page 101 of 205
HCM 6th TWSC Barberville Road TIS
200: Barberville Road & Harbor Bay Drive 2026 Build PM
RKA Synchro 11 Report
Intersection
Int Delay, s/veh 0.7
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 23 33 665 635 5
Future Vol, veh/h 10 23 33 665 635 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 11 25 36 723 690 5
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1488 693 695 0 - 0
Stage 1 693 - - - - -
Stage 2 795 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 137 443 901 - - -
Stage 1 496 - - - - -
Stage 2 445 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 128 443 901 - - -
Mov Cap-2 Maneuver 128 - - - - -
Stage 1 463 - - - - -
Stage 2 445 - - - - -
Approach EB NB SB
HCM Control Delay, s 21.5 0.4 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 901 - 254 - -
HCM Lane V/C Ratio 0.04 - 0.141 - -
HCM Control Delay (s) 9.2 0 21.5 - -
HCM Lane LOS A A C - -
HCM 95th %tile Q(veh) 0.1 - 0.5 - -
Page 102 of 205
HCM 6th TWSC Barberville Road TIS
300: Barberville Road & Site Access 2026 Build PM
RKA Synchro 11 Report
Intersection
Int Delay, s/veh 2.5
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 35 81 73 663 625 32
Future Vol, veh/h 35 81 73 663 625 32
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 50 0 150 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 38 88 79 721 679 35
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1576 697 714 0 - 0
Stage 1 697 - - - - -
Stage 2 879 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 121 441 886 - - -
Stage 1 494 - - - - -
Stage 2 406 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 110 441 886 - - -
Mov Cap-2 Maneuver 110 - - - - -
Stage 1 450 - - - - -
Stage 2 406 - - - - -
Approach EB NB SB
HCM Control Delay, s 26.9 0.9 0
HCM LOS D
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity (veh/h) 886 - 110 441 - -
HCM Lane V/C Ratio 0.09 - 0.346 0.2 - -
HCM Control Delay (s) 9.5 - 54.1 15.2 - -
HCM Lane LOS A - F C - -
HCM 95th %tile Q(veh) 0.3 - 1.4 0.7 - -
Page 103 of 205
HCM 6th Signalized Intersection Summary Barberville Road TIS
100: Fort Mill Highway & Barberville Road 2026 Build Improved AM
RKA Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 614 821 0 0 633 175 0 0 0 179 0 392
Future Volume (veh/h) 614 821 0 0 633 175 0 0 0 179 0 392
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847
Adj Flow Rate, veh/h 667 892 0 0 688 190 0 0 0 195 0 426
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 654 2452 0 0 1192 929 0 2 0 465 0 413
Arrive On Green 0.24 0.64 0.00 0.00 0.35 0.35 0.00 0.00 0.00 0.26 0.00 0.26
Sat Flow, veh/h 1931 3953 0 0 3463 1505 0 1949 0 1759 0 1565
Grp Volume(v), veh/h 667 892 0 0 688 190 0 0 0 195 0 426
Grp Sat Flow(s),veh/h/ln 1931 1926 0 0 1687 1505 0 1949 0 1759 0 1565
Q Serve(g_s), s 28.9 13.1 0.0 0.0 19.9 6.6 0.0 0.0 0.0 11.0 0.0 31.7
Cycle Q Clear(g_c), s 28.9 13.1 0.0 0.0 19.9 6.6 0.0 0.0 0.0 11.0 0.0 31.7
Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 654 2452 0 0 1192 929 0 2 0 465 0 413
V/C Ratio(X) 1.02 0.36 0.00 0.00 0.58 0.20 0.00 0.00 0.00 0.42 0.00 1.03
Avail Cap(c_a), veh/h 654 2452 0 0 1192 929 0 141 0 465 0 413
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 25.7 10.3 0.0 0.0 31.5 10.0 0.0 0.0 0.0 36.5 0.0 44.2
Incr Delay (d2), s/veh 40.5 0.4 0.0 0.0 2.0 0.5 0.0 0.0 0.0 0.6 0.0 52.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 16.6 5.1 0.0 0.0 8.1 4.0 0.0 0.0 0.0 4.7 0.0 17.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 66.2 10.7 0.0 0.0 33.6 10.5 0.0 0.0 0.0 37.1 0.0 96.4
LnGrp LOS F B A A C B A A A D A F
Approach Vol, veh/h 1559 878 0 621
Approach Delay, s/veh 34.5 28.6 0.0 77.8
Approach LOS C C E
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 83.0 37.0 34.0 49.0 0.0
Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3
Max Green Setting (Gmax), s * 62 * 32 28.9 * 28 8.7
Max Q Clear Time (g_c+I1), s 15.1 33.7 30.9 21.9 0.0
Green Ext Time (p_c), s 20.1 0.0 0.0 3.8 0.0
Intersection Summary
HCM 6th Ctrl Delay 41.6
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Page 104 of 205
HCM 6th Signalized Intersection Summary Barberville Road TIS
100: Fort Mill Highway & Barberville Road 2026 Build Improved PM
RKA Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 477 865 0 0 749 262 1 0 0 435 0 266
Future Volume (veh/h) 477 865 0 0 749 262 1 0 0 435 0 266
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847
Adj Flow Rate, veh/h 518 940 0 0 814 285 1 0 0 473 0 289
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 551 2274 0 0 1098 887 4 0 0 465 0 413
Arrive On Green 0.22 0.59 0.00 0.00 0.33 0.33 0.00 0.00 0.00 0.26 0.00 0.26
Sat Flow, veh/h 1931 3953 0 0 3463 1505 1856 0 0 1759 0 1565
Grp Volume(v), veh/h 518 940 0 0 814 285 1 0 0 473 0 289
Grp Sat Flow(s),veh/h/ln 1931 1926 0 0 1687 1505 1856 0 0 1759 0 1565
Q Serve(g_s), s 23.9 15.9 0.0 0.0 25.7 11.5 0.1 0.0 0.0 31.7 0.0 20.0
Cycle Q Clear(g_c), s 23.9 15.9 0.0 0.0 25.7 11.5 0.1 0.0 0.0 31.7 0.0 20.0
Prop In Lane 1.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 551 2274 0 0 1098 887 4 0 0 465 0 413
V/C Ratio(X) 0.94 0.41 0.00 0.00 0.74 0.32 0.25 0.00 0.00 1.02 0.00 0.70
Avail Cap(c_a), veh/h 587 2274 0 0 1098 887 135 0 0 465 0 413
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 29.7 13.3 0.0 0.0 36.0 12.5 59.8 0.0 0.0 44.2 0.0 39.8
Incr Delay (d2), s/veh 22.7 0.6 0.0 0.0 4.5 1.0 28.9 0.0 0.0 46.4 0.0 5.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 17.8 6.5 0.0 0.0 10.8 6.9 0.1 0.0 0.0 19.3 0.0 8.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 52.3 13.9 0.0 0.0 40.5 13.4 88.7 0.0 0.0 90.5 0.0 45.0
LnGrp LOS D B A A D B F A A F A D
Approach Vol, veh/h 1458 1099 1 762
Approach Delay, s/veh 27.5 33.5 88.7 73.3
Approach LOS C C F E
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 77.4 37.0 31.8 45.6 5.6
Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3
Max Green Setting (Gmax), s * 62 * 32 28.9 * 28 8.7
Max Q Clear Time (g_c+I1), s 17.9 33.7 25.9 27.7 2.1
Green Ext Time (p_c), s 21.0 0.0 0.8 0.5 0.0
Intersection Summary
HCM 6th Ctrl Delay 40.0
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Page 105 of 205
Traffic Impact Analysis Review – Barberville Road Development
Technical Memorandum
May 30, 2024 Eric Dillon
1Page | 2
1. Overview of Traffic Impact Analysis (TIA) Report
Ramey Kemp submitted a traffic impact analysis report for a mixed-use development fronting Barberville
Road at SC 150 in Lancaster County. The report was labeled draft and not signed, and no Engineer on
Record (EOR) was verified for this traffic study. Fort Mill Highway (SC 160) at Barberville Road/Stock
Lane and Barberville Road at Harbor Bay Drive and one site access across from Fortson Road was analyzed
in this report. The proposed access is approximately 670’ north of Fort Mill Highway that lines up with
Fortson Road. The site plan in the report showed a mixed use of three parcels that included a day care, strip
retail, and small office building. However, there was a plat that was not included in the traffic study that
showed eight parcels in addition to the existing cell tower on the property. The report contained existing,
no-build, and build traffic volumes for all study locations and with good distribution among all points.
There was background development traffic added to the final build models from other approved
developments in the area. The analysis final year was determined to be 2026 in the report which is assumed
build +1 year for Lancaster County UDO compliance since this is a small development.
2. Items of Interest in the TIA Report
The TIA document was redlined with marks highlighting discrepancies/interest items below (pages noted
below reflect pdf pages and not report pages):
Cover Page – No PE signature and no EOR labeled.
Page 6 – Analysis year 2026 does not state that the build year is 2025 which could be assumed due to
the small size of the development which could be completed next year.
Page 8 – Site plan in study shows 3 parcels with existing cell tower which the analysis was done for.
A plat received by Lancaster County shows 8 parcels.
Page 9 – Traffic counts are a year old – study must have been delayed in submitting.
Page 16 – Growth rate showed only 1% based on 3 years of SCDOT count station data. Should use 5
– 10 years to get a more accurate rate. However, a significant amount of background traffic was
established based on previous approved developments.
Page 70 – Should utilize Peak Hour Factor (PHF) from traffic counts and not Synchro defaults at PHF
= .92. SCDOT default is PHF = .90.
Page 70 - Volumes utilized in AM Build Synchro do not match AM Build volumes in Figure 8 in the
report. Need to show additional reports to reflect Queuing southbound on Barberville Road at Fort
Mill Highway. Micro analysis would be good to determine if queues could possibly reach the
proposed access at build out.
Page 73 – Major delay for WB traffic on Fort Mill Highway during PM peak which is also shown in
the No-Build scenario.
3. Checklist Comments
An accompanying TIA checklist that reviews all submitted information for proper TIA submittal. Main
items are the site plan and separate plat discrepancies. Site engineer needs to verify sight distance for access.
Page 106 of 205
Traffic Impact Analysis Review – Barberville Road Development
Technical Memorandum
May 30, 2024 Eric Dillon
2Page | 2
4. Recommendations/Action Items
Action items are as follows:
If future development causes additional parcels to be developed other than those
presented in this study; a new traffic impact study will be required.
Verify sight distance for the access point.
Traffic study needs to be reviewed and corrected by EOR and signed and stamped by the
EOR.
Conduct a queue analysis for the Barberville Road SB movement at Fort Hill Highway to
determine any impediment to the proposed access.
Install left turn lane on Barberville Road as recommended by extending the 3-lane section
from Fort Mill Highway.
Page 107 of 205
1 | P a g e
November 21, 2024
Reference : Barberville Road Development – Lancaster County
Response to TIA Comments
The following provides a response to TIA review comments received from the County on
November 18, 2024, for the Barberville Road Development.
1. Analysis year 2026 does not state the build year is 2025. Which could be assumed
due to the small size of the development which could be completed next year.
• The anticipated build year is 2025. Analysis year 2026 represents a 2025 build year +1,
consistent with Lancaster UDO.
2. The site plan in study shows 3 parcels with existing cell tower which the analysis was
done for. A plat received by Lancaster County shows 8 parcels.
• The updated site plan shows Parcels 1, 2, 3, and 8, with one (1) access point from
Barberville Road serving the site . Additional parcels or modifications to access would
warrant further discussion and potentially require an update to the traffic study.
3. Traffic counts are a year old.
• Acknowledged, the traffic counts were conducted when the study was originally completed.
A series of delays in processing the application have led to a longer review period.
4. Should utilize Peak Hour Factor (PHF) from traffic counts and not Synchro defaults at
PHF =.92. SCDOT default is PHF = .90.
• The peak hour factors were conservatively updated to the SCDOT default of 0.90.
5. Volumes utilized in AM build Synchro do not match AM Build volumes in figure 8 in the
report. Need to show additional reports to reflect queueing southbound on Barberville
Road at Fort Mill Highway.
• Volumes were corrected to match Figure 8 in the AM Build scenario. The queueing reports
have been provided in the updated study for reference.
6. Major delay for the westbound traffic on Fort Mill Highway during PM peak which is
also shown in the No-Build scenario.
• Acknowledged, the delays occur under future conditions both with and without the subject
site. SCDOT has accepted t he proposed left-turn lane improvement mitigate s the subject
properties potential future impacts at the site driveway and would not require further
analysis.
Page 108 of 205
Lancaster County
Planning Department
P. O. Box 1809
Lancaster, SC 29721
803.285.6005
planning@lancastercountysc.net
4929 Monroe Road
Charlotte, NC 28205
Oak Engineering
January 08, 2025
Greg Welsh
Parcel(s)
Stage
Location
Project Number
Status
Traffic Impact Analysis
Approved
0006-00-057.00
9901 & 9831 Barberville Road
Project Name Barberville Commercial
20231869
Dear: Greg Welsh
We have completed our review. The comments listed on the attached report must be addressed with a response letter.
Once revised plans are received, they will be submitted to staff for review.
*Please be aware that plans will not be routed for review without a response letter*
Sincerely,
Chanda Kirkland, Development Service Coordinator
Lancaster County Government
101 N Main St
Lancaster, SC 29720
P: (803) 416-9390
Page 1 of 21/8/2025
Page 109 of 205
Plan Review Comments
County Engineer - Stephen Blackwelder - 8035482406
sblackwelder@lancastercountysc.gov
Approved
Review Comments:
Lancaster County is approving this as proposed without the connection to Overlook at Barber Rock.
The potential connection to Overlook at Barber Rock mentioned in the SCDOT comments is a concern for Lancaster County.
This would require approval by the Planning Commission and has potential to cause a great deal of complaints from the
residents there.
If SCDOT is going to require this as a part of their encroachment permit process, we will need to have discussions with them
and the development team.
Planning - Matthew Blaszyk - 803-285-6005
mblaszyk@lancastercountysc.gov
No Review Done
Review Comments:
Page 2 of 21/8/2025
Page 110 of 205
Traffic Impact Analysis Review – Barberville Road Development
Technical Memorandum
May 30, 2024 Eric Dillon
1Page | 2
1. Overview of Traffic Impact Analysis (TIA) Report
Ramey Kemp submitted a traffic impact analysis report for a mixed-use development fronting Barberville
Road at SC 150 in Lancaster County. The report was labeled draft and not signed, and no Engineer on
Record (EOR) was verified for this traffic study. Fort Mill Highway (SC 160) at Barberville Road/Stock
Lane and Barberville Road at Harbor Bay Drive and one site access across from Fortson Road was analyzed
in this report. The proposed access is approximately 670’ north of Fort Mill Highway that lines up with
Fortson Road. The site plan in the report showed a mixed use of three parcels that included a day care, strip
retail, and small office building. However, there was a plat that was not included in the traffic study that
showed eight parcels in addition to the existing cell tower on the property. The report contained existing,
no-build, and build traffic volumes for all study locations and with good distribution among all points.
There was background development traffic added to the final build models from other approved
developments in the area. The analysis final year was determined to be 2026 in the report which is assumed
build +1 year for Lancaster County UDO compliance since this is a small development.
2. Items of Interest in the TIA Report
The TIA document was redlined with marks highlighting discrepancies/interest items below (pages noted
below reflect pdf pages and not report pages):
Cover Page – No PE signature and no EOR labeled.
Page 6 – Analysis year 2026 does not state that the build year is 2025 which could be assumed due to
the small size of the development which could be completed next year.
Page 8 – Site plan in study shows 3 parcels with existing cell tower which the analysis was done for.
A plat received by Lancaster County shows 8 parcels.
Page 9 – Traffic counts are a year old – study must have been delayed in submitting.
Page 16 – Growth rate showed only 1% based on 3 years of SCDOT count station data. Should use 5
– 10 years to get a more accurate rate. However, a significant amount of background traffic was
established based on previous approved developments.
Page 70 – Should utilize Peak Hour Factor (PHF) from traffic counts and not Synchro defaults at PHF
= .92. SCDOT default is PHF = .90.
Page 70 - Volumes utilized in AM Build Synchro do not match AM Build volumes in Figure 8 in the
report. Need to show additional reports to reflect Queuing southbound on Barberville Road at Fort
Mill Highway. Micro analysis would be good to determine if queues could possibly reach the
proposed access at build out.
Page 73 – Major delay for WB traffic on Fort Mill Highway during PM peak which is also shown in
the No-Build scenario.
3. Checklist Comments
An accompanying TIA checklist that reviews all submitted information for proper TIA submittal. Main
items are the site plan and separate plat discrepancies. Site engineer needs to verify sight distance for access.
Page 111 of 205
Traffic Impact Analysis Review – Barberville Road Development
Technical Memorandum
May 30, 2024 Eric Dillon
2Page | 2
4. Recommendations/Action Items
Action items are as follows:
If future development causes additional parcels to be developed other than those
presented in this study; a new traffic impact study will be required.
Verify sight distance for the access point.
Traffic study needs to be reviewed and corrected by EOR and signed and stamped by the
EOR.
Conduct a queue analysis for the Barberville Road SB movement at Fort Hill Highway to
determine any impediment to the proposed access.
Install left turn lane on Barberville Road as recommended by extending the 3-lane section
from Fort Mill Highway.
Page 112 of 205
481 Garlington Road, Suite L | Greenville, SC 29615 | 864-565-0510 | www.ice-eng.com
An Equal Opportunity Employer
Project Name:
TIA Checklist
N/A Yes No
☐ ☐ ☒South Carolina PE Stamp and Signature on TIA/Plans
☐ ☒ ☐Introduction and Executive Summary
☐ ☒ ☐Study Area Descriptions and Roadway Classifications
☐ ☒ ☒Analysis Period Correct
☐ ☒ ☐Existing Traffic Operations
☐ ☒ ☐Other projected transportation improvements in the study area
☐ ☒ ☐Trip Generation Summary
☐ ☒ ☐Trip Distribution and traffic assignment
☐ ☒ ☐LOS Analysis: Background traffic growth and site build out
☐ ☐ ☒Analysis of Sight Distance at Access Points *
☐ ☒ ☐Identify need for Turn Lanes, Capacity and Storage Length
☒ ☐ ☐Identify need for Signalization
☐ ☒ ☐Identify Measures to Mitigate LOS deficiencies
☐ ☒ ☐Vicinity Map
☐ ☒ ☒Site Plan and Proposed Land Use**
☐ ☒ ☐Existing Peak hour volumes (counts conducted within the last 12 months)
☐ ☒ ☐Projected Background Peak Hour Volumes -
☐ ☒ ☐Trip Distribution % Including Added Project Peak Hour Volumes
☐ ☒ ☒Project Build-Out Volumes***
☐ ☒ ☐Existing and Recommended Lane Configurations
☐ ☒ ☐Intersection LOS (existing, background, build, mitigated)
☐ ☒ ☐Unified Development Ordinance Section 6.8
Comments:
* Sight distance was noted to be verified by site engineer for access
** Site plan in study shows 3 parcels, a separate plat shows 8 parcels
*** Discrepancy in Build Volumes between the Figure 8 and Synchro for AM Peak
Barberville Road Mixed-Use Development
Page 113 of 205
TRAFFIC IMPACT STUDY
for the
Barberville Road
Development
Located in
Lancaster County, South Carolina
Prepared for
Moody Holdings & Development
Prepared by
Ramey Kemp Associates, Inc.
June 2023
RKA Project #23126
Page 114 of 205
TRAFFIC IMPACT STUDY
for the
Barberville Road
Development
Located in
Lancaster County, South Carolina
Prepared for
Moody Holdings & Development
6201 Fairview Rd, Ste 200
Charlotte, North Carolina 28210
Prepared by
Ramey Kemp Associates, Inc.
1411 Gervais Street, Suite 150
Columbia, South Carolina 29201
June 2023
RKA Project #23126
Page 115 of 205
Barberville Road TIS | i
Table of Contents
EXECUTIVE SUMMARY .................................................................................................................. iii
1.1. Project Background ............................................................................................. 1
1.2. Existing Roadway Conditions ........................................................................... 4
1.3. Existing Traffic Count ........................................................................................ 4
1.4. Driveway Location ............................................................................................. 4
2. PROJECT TRAFFIC ...................................................................................................................... 7
2.1. Proposed Land Uses ........................................................................................... 7
2.2. Trip Generation Estimates ................................................................................. 7
2.3. Trip Distribution & Assignment ....................................................................... 8
3. TRAFFIC VOLUME DEVELOPMENT .................................................................................... 11
3.1. Future No-Build Traffic Volumes ................................................................... 11
3.2. Build Out Traffic Volumes ............................................................................... 11
4. TRAFFIC IMPACT ANALYSIS ................................................................................................. 14
4.1. Turn-Lane Analysis .......................................................................................... 14
4.2. Intersection LOS Analysis ................................................................................ 14
5. SUMMARY OF FINDINGS AND RECOMMENDATIONS ................................................. 18
Page 116 of 205
Barberville Road TIS | ii
List of Tables
Table 1 – Street Inventory ......................................................................................................................... 4
Table 2 – Trip Generation Estimates ....................................................................................................... 7
Table 3 – HCM 6th Edition LOS Criteria for Unsignalized and Signalized Intersections ................ 14
Table 4 – Unsignalized and Signalized Intersection Analysis Results ............................................. 15
Table 5 – Unsignalized and Signalized Intersection Analysis Results ............................................. 16
List of Figures
Figure 1 – Project Location Map .............................................................................................................. 2
Figure 2 – Conceptual Site Plan ............................................................................................................... 3
Figure 3 – Existing Lane Configuration .................................................................................................. 5
Figure 4 – Existing (2023) Peak-Hour Traffic Volumes ........................................................................ 6
Figure 5 – Project Trip Distribution ......................................................................................................... 9
Figure 6 – Project Trip Assignment ....................................................................................................... 10
Figure 7 – No-Build (2026) Peak-Hour Traffic Volumes .................................................................... 12
Figure 8 – Build (2026) Peak-Hour Traffic Volumes ........................................................................... 13
Figure 9 – Proposed Lane Configuration .............................................................................................. 17
List of Appendices
A) Traffic Scoping
B) Traffic Count Data
C) Traffic Volume Development Worksheets and ITE Trip Generation Worksheets
D) Turn-Lane Analysis Worksheets
E) Capacity Analysis
Page 117 of 205
Barberville Road TIS | iii
EXECUTIVE SUMMARY
A traffic impact study was conducted for the proposed Barberville Road development in
accordance with SCDOT guidelines. The development is located west of Barberville Road (S-29-42)
and north of SC 160 in Lancaster County, South Carolina. The development is proposed to consist
of a roughly 120 student school/daycare center, 18,000 SF of retail space and 8,000 SF of office
space. The site will have one access on Barberville Road, with internal connections to adjacent
parcels.
Based on the anticipated build out volumes, a northbound left turn lane is warranted and
recommended on Barberville Road at the access point. An auxiliary southbound right turn lane is
not warranted. The site access should include one ingress and two egress lanes (50’ storage) and
should be designed to provide proper sight distances and meet SCDOT design criteria.
With construction of the project, Barberville Road & Harbor Bay Drive should continue to function
adequately.
The intersection of Fort Mill Highway (SC 160) at Barberville Road expected to experience delays
with or without the development. Lancaster County guidelines specify that if the LOS on a
principal arterial is below LOS D, then the TIS “shall identify those improvements required to
ensure that development related traffic demands result in no net reduction in LOS, and identify
additional improvements needed to raise the level of service on the applicable street to the adopted
LOS standard.”
The signalized Fort Mill Highway & Barberville Road intersection currently operates as an LOS E
and is expected to reach LOS F in the No Build conditions. Auxiliary turn lanes are already present
on SC 160 and on southbound Barberville Road. Raising the level of service on the Fort Mill
Highway (SC 160) at Barberville Road to a LOS D would require additional eastbound and
westbound through lanes along SC 160, along with signal timing optimization. TIS’s for the
background developments (2,000+ residential units) did not recommend widening SC 160 as part
of the background conditions.
The proposed development should not add significant amounts of traffic to the area. No additional
improvements to the area roadways are recommended as part of this development.
Page 118 of 205
Barberville Road TIS | 1
1. INTRODUCTION
The purpose of this report is to document a traffic impact study for the proposed Barberville Road
development in accordance with SCDOT guidelines. This report summarizes the procedures and
findings of the traffic impact study. Traffic scoping documentation is provided in Appendix A.
1.1. Project Background
The development is located west of Barberville Road (S-29-42) and north of SC 160 in Lancaster
County, South Carolina. The development is proposed to consist of a roughly 120 student
school/daycare center, 18,000 SF of retail space and 8,000 SF of office space. The site will have one
access on Barberville Road, with internal connections to adjacent parcels.
The traffic impact study considers the weekday AM peak period (between 7:00 AM and 9:00 AM)
and the weekday PM peak period (between 4:00 PM and 6:00 PM) as the study time frames. The
following intersections are studied:
Fort Mill Highway (SC 160) & Barberville Road (S-29-42)/ Stock Lane
Barberville Road (S-29-42) & Harbor Bay Drive
Barberville Road (S-29-42) & Fortson Road /Site Access
Future-year analyses assume 2026 conditions as the Build scenario. Figure 1 shows the location of
the project site, and Figure 2 illustrates the conceptual site plan.
Page 119 of 205
Barberville Road TIS - Traffic Impact Study
Figure 1 - Project Location Map
Page 2
Barberville RoadHarbor Bay LaneSite Access
Page 120 of 205
Barberville Road TIS - Traffic Impact Study
Figure 2 - Conceptual Site Plan
Page 3
Page 121 of 205
Barberville Road TIS | 4
1.2. Existing Roadway Conditions
A review of the existing roadway conditions in the study area was conducted and is summarized
in Table 1. Figure 3 illustrates the existing lane geometry.
Table 1 – Street Inventory
1.SCDOT Count Station 29-0163; 2.SCDOT Count Station 29-0195
1.3. Existing Traffic Count
Vehicle turning movement counts were collected in May 2023 for the AM peak period (7:00 AM to
9:00 AM) and PM peak period (4:00 PM to 6:00 PM) at the following intersections:
Fort Mill Highway (SC 160) & Barberville Road (S-29-42)/ Stock Lane
Barberville Road (S-29-42) & Harbor Bay Drive
All counts were conducted while the local school district was in session. The 2023 raw traffic
volumes are provided in Appendix A. Existing traffic volumes are illustrated in Figure 4.
1.4. Driveway Location
The development is expected to provide one (1) full access driveway on Barberville Road. The
proposed site Access is located approximately 670 feet north of Fort Mill Highway.
The proposed driveways appear to meet the SCDOT ARMS spacing requirements.
Facility Name Route # Typical Cross
Section
Posted
Speed
Limit
Maintained
By
2021
AADT
Fort Mill Highway SC 160 3-lane undivided
(TWLTL) 45 MPH SCDOT 15,200 1
Barberville Road S-29-42 2-lane undivided 40 MPH SCDOT 7,900 2
Stock Lane N/A 2-lane undivided N/P Local N/A
Harbor Bay Drive N/A 2-lane undivided N/P Local N/A
Fortson Road N/A 2-lane undivided N/P Local N/A
Page 122 of 205
Page 5
Barberville Road TIS - Traffic Impact Study
Figure 3 - Existing Lane Configuration
260'
210'220'
Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane
Harbor Bay Lane
Page 123 of 205
2 '2'!
3 '3'!
1 '1'!
Page 6
0
(1)(0)(0)
Barberville Road TIS - Traffic Impact Study
Figure 4 - Existing (2023) Peak-Hour Traffic Volumes
0 (0)
(312) 525
(785) 759
000
(0)
2610124
120 (202)
565 (695)
(511)(145)(0)(366)641388 (516)
(22) 19
(32)(479)5636
(10) 31
10369(5)(494)
Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane
Harbor Bay Lane
Page 124 of 205
Barberville Road TIS | 7
2. PROJECT TRAFFIC
2.1. Proposed Land Uses
The Barberville Road development is proposed to contain a 120 student school/daycare center,
with additional parcels that are envisioned to include approximately 18,000 SF of retail space and
8,000 SF of office space. The project site is currently vacant.
2.2. Trip Generation Estimates
The trip generation potential was estimated using information contained in ITE’s Trip Generation
Manual, 11th Edition (2021) for land use code (LUC) 565 – Day Care Center, (LUC) 822 Strip Retail
Plaza and (LUC) 712 – Small Office Building . The trip generation estimates for the weekday daily,
the weekday AM peak-hour of the adjacent street, and the weekday PM peak-hour of the adjacent
street time periods are shown in Table 2.
Table 2 – Trip Generation Estimates
Page 125 of 205
Barberville Road TIS | 8
2.3. Trip Distribution & Assignment
New external traffic expected to be generated was distributed and assigned to the roadway
network based on the existing patterns and surrounding land uses. The general distribution of new
external project trips was assumed to be:
70% to/from the south via Barberville Road and
30% to/from the north via Barberville Road
The directional distribution assumptions are shown in Figure 5. The assignment of the project
traffic is shown in Figure 6.
Page 126 of 205
30%30%30%70%
30%
70%50%20%
Page 9
Barberville Road TIS - Traffic Impact Study
Figure 5 - Project Trip Distribution
20%
50%
Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane
Site AccessHarbor Bay Lane30%
50%20%
Project Site
Page 127 of 205
2 '2'!
3 '3'!
1 '1'!
Page 10
Barberville Road TIS - Traffic Impact Study
Figure 6 - Project Trip Assignment
16 (20)
(53) 41
3112
43
(73)(58)(23)57
(35) 18
(81)
25 (32)(35) 1825 (32)
Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane
Site AccessHarbor Bay LaneProject Site
Page 128 of 205
Barberville Road TIS | 11
3. TRAFFIC VOLUME DEVELOPMENT
3.1. Future No-Build Traffic Volumes
To develop an annual background growth rate for use in the analysis, count data was reviewed
from the years 2017 to 2020 at SCDOT Count Station 29-0163 and 29-195. Reviewing the historic
growth and observing the growth pattern in the surrounding area, a 1.0% annual growth was
adopted for this study. This annual growth rate was utilized to develop the 2026 No-Build traffic
volumes.
Several vested developments were considered for the study area. Site traffic from the Lodges at
Indian Land, Harrisburg Road Residential (Sugar Creek), Redwood Apartments, Pettus Pond,
Patterson Preserve and Patterson Lane Apartments were included in the vested trips. The vested
projects include a total of 2,014 residential units expected to be completed before the Barberville
Road development build out. None of the Traffic Impact Studies for these developments
recommended any improvements to the Fort Mill Highway (SC 160) at Barberville Road.
The site trips from the vested developments are provided in Appendix A. The 2026 No-Build
volumes are illustrated in Figure 7.
3.2. Build Out Traffic Volumes
The site generated traffic volumes were added to the 2026 No-Build traffic volumes to determine
the 2026 Build volumes. The 2026 Build volumes are illustrated in Figure 8. Volume development
worksheets are included in Appendix B.
Page 129 of 205
2 '2'!
3 '3'!
1 '1'!
Page 12
0
(1)(0)(0)
Barberville Road TIS - Traffic Impact Study
Figure 7 - No-Build (2026) Peak-Hour Traffic Volumes
0 (0)
(424) 573
(865) 821
000
(0)
3610167
159 (242)
633 (749)
(663)(208)(0)(412)727531 (625)
(23) 20
(33)(630)5722
(10) 32
10511(5)(603)
Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane
Harbor Bay Lane
Page 130 of 205
2 '2'!
3 '3'!
1 '1'!
Page 13
0
(1)(0)(0)
Barberville Road TIS - Traffic Impact Study
Figure 8 - Build (2026) Peak-Hour Traffic Volumes
0 (0)
(477) 614
(865) 821
000
(0)
3920179
175 (262)
633 (749)
43
(73)(663)(266)(0)(435)57727
(35) 18
(81)
25531(32)(625)
(23) 20
(33)(665)5740
(10) 32
10536(5)(635)
Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane
Site AccessHarbor Bay LaneProject Site
Page 131 of 205
Barberville Road TIS | 14
4. TRAFFIC IMPACT ANALYSIS
4.1. Turn-Lane Analysis
Auxiliary turn-lane analyses were conducted using the 2026 Build volumes. Turn-lane analyses
were considered based on the SCDOT Roadway Design Manual (RDM) Section 9.5.1.
Based on the anticipated build out volumes, a northbound left turn lane is warranted and
recommended on Barberville Road at the access point. An auxiliary southbound right turn lane is
not warranted. The site access should be designed to provide proper sight distances and meet
SCDOT design criteria.
Turn-lane analyses are provided in Appendix D.
4.2. Intersection LOS Analysis
Intersection analyses were conducted for the study intersections considering 2023 Existing
conditions, 2026 No-Build conditions, and 2026 Build conditions. This analysis was conducted
using the Transportation Research Board’s Highway Capacity Manual 6th Edition (HCM 6th Edition)
methodologies of the Synchro, Version 11 software.
Intersection level of service (LOS) grades range from LOS A to LOS F, which are directly related to
the level of control delay at the intersection and characterize the operational conditions of the
intersection traffic flow. LOS A operations typically represent ideal, free-flow conditions where
vehicles experience little to no delays, and LOS F operations typically represent poor, forced-flow
(bumper-to-bumper) conditions with high vehicular delays and are generally considered
undesirable. Table 3 summarizes the HCM 6th Edition control delay thresholds associated with each
LOS grade for unsignalized and signalized intersections.
Table 3 – HCM 6th Edition LOS Criteria for Unsignalized and Signalized Intersections
Unsignalized Intersections Signalized Intersections
LOS Control Delay per
Vehicle (seconds)
LOS Control Delay per
Vehicle (seconds)
A ≤ 10 A ≤ 10
B > 10 and ≤ 15 B > 10 and ≤ 20
C > 15 and ≤ 25 C > 20 and ≤ 35
D > 25 and ≤ 35 D > 35 and ≤ 55
E > 35 and ≤ 50 E > 55 and ≤ 80
F > 50 F > 80
Page 132 of 205
Barberville Road TIS | 15
As part of the intersection analysis, SCDOT’s default Synchro parameters were utilized. A constant
PHF of 0.92 was applied for future year analysis. Existing heavy vehicle percentages were utilized
for all analysis scenarios, with a minimum percentage of 2% considered.
Using the Synchro software, intersection analyses were conducted for the weekday AM peak-hour
and weekday PM peak-hour time periods. A 150-foot storage northbound left turn lane was
analyzed in the build conditions at the site access. The results of the intersection analyses are
summarized in Table 4.
Table 4 – Unsignalized and Signalized Intersection Analysis Results
Intersection Approach
LOS/Delay (seconds)
2023 Existing
Conditions
2026 No-Build
Conditions
2026 Build
Conditions
AM PM AM PM AM PM
Fort Mill Highway
(SC 160) &
Barberville Road
(Signalized)
EB C/34.9 C/19.2 E/66.7 C/34.0 E/76.3 D/39.6
WB C/20.3 C/27.4 E/64.6 F/148.5 D/51.9 F/168.0
NB A/0.0 E/75.5 A/0.0 F/88.7 A/0.0 F/88.7
SB E/70.4 F/198.9 F/84.3 F/86.2 F/105.8 F/99.2
Overall D/36.5 E/58.8 E/69.5 F/84.3 E/75.7 F/95.8
Barberville Road &
Harbor Bay Drive
(Unsignalized)
EB1 C/19.4 C/15.9 C/26.5 C/20.1 D/27.8 C/21.5
NB2 A/8.2 A/8.6 A/8.6 A/9.0 A/8.7 A/9.2
Barberville Road &
Site Access
(Unsignalized)
EB -- -- -- -- C/20.3 D/26.9
NB2 -- -- -- -- A/8.9 A/9.5
1.LOS for major street left-turn movement; 2.LOS for minor street approach
With construction of the project, Barberville Road & Harbor Bay Drive should continue to function
adequately. The site access should include one ingress and two egress lanes (50’ storage).
The intersection of Fort Mill Highway (SC 160) at Barberville Road expected to experience delays
with or without the development. Lancaster County guidelines specify that if the LOS on a
principal arterial is below LOS D, then the TIS “shall identify those improvements required to
ensure that development related traffic demands result in no net reduction in LOS, and identify
additional improvements needed to raise the level of service on the applicable street to the adopted
LOS standard.”
The signalized Fort Mill Highway & Barberville Road intersection currently operates as an LOS E.
and is expected to reach LOS F in the No Build conditions. Auxiliary turn lanes are already present
on SC 160 and on southbound Barberville Road. To raise the level of service on the Fort Mill
Page 133 of 205
Barberville Road TIS | 16
Highway (SC 160) at Barberville Road to a LOS D, additional eastbound and westbound through
lanes along SC 160 would be required, along with signal timing optimization.
TIS’s for the background developments (2,000+ residential units) did not recommend widening SC
160 as part of the background conditions. The proposed development should not add significant
amounts of traffic to the area. No additional improvements to the area roadways are recommended
as part of this development.
If SC 160 were widened to provide a four-lane section, the LOS would be as shown in Table 5.
Table 5 – Unsignalized and Signalized Intersection Analysis Results
Intersection Approach
LOS/Delay
(seconds)
2026 Build
Improved
Conditions
AM PM
Fort Mill Highway
(SC 160) &
Barberville Road
(Signalized)
EB C/34.5 C/27.5
WB C/28.6 C/33.5
NB A/0.0 F/88.7
SB E/77.8 E/73.3
Overall D/41.6 D/40.0
Figure 9 shows the recommended lane configuration for the Build (2026) condition. A capacity
analysis summary is proved in Appendix D.
Page 134 of 205
Page 17
Barberville Road TIS - Traffic Impact Study
Figure 9 - Proposed Lane Configuration
250'
225'200' 150'
50'
Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane
Site AccessHarbor Bay LaneProject Site
Page 135 of 205
Barberville Road TIS | 18
5. SUMMARY OF FINDINGS AND RECOMMENDATIONS
A traffic impact study was conducted for the proposed Barberville Road development in
accordance with SCDOT guidelines. The development is located west of Barberville Road (S-29-42)
and north of SC 160 in Lancaster County, South Carolina. The development is proposed to consist
of a roughly 120 student school/daycare center, 18,000 SF of retail space and 8,000 SF of office
space. The site will have one access on Barberville Road, with internal connections to adjacent
parcels.
Based on the anticipated build out volumes, a northbound left turn lane is warranted and
recommended on Barberville Road at the access point. An auxiliary southbound right turn lane is
not warranted. The site access should include one ingress and two egress lanes (50’ storage) and
should be designed to provide proper sight distances and meet SCDOT design criteria.
With construction of the project, Barberville Road & Harbor Bay Drive should continue to function
adequately.
The intersection of Fort Mill Highway (SC 160) at Barberville Road expected to experience delays
with or without the development. Lancaster County guidelines specify that if the LOS on a
principal arterial is below LOS D, then the TIS “shall identify those improvements required to
ensure that development related traffic demands result in no net reduction in LOS, and identify
additional improvements needed to raise the level of service on the applicable street to the adopted
LOS standard.”
The signalized Fort Mill Highway & Barberville Road intersection currently operates as an LOS E.
and is expected to reach LOS F in the No Build conditions. Auxiliary turn lanes are already present
on SC 160 and on southbound Barberville Road. Raising the level of service on the Fort Mill
Highway (SC 160) at Barberville Road to a LOS D would require additional eastbound and
westbound through lanes along SC 160, along with signal timing optimization. TIS’s for the
background developments (2,000+ residential units) did not recommend widening SC 160 as part
of the background conditions.
The proposed development should not add significant amounts of traffic to the area. No additional
improvements to the area roadways are recommended as part of this development.
Page 136 of 205
APPENDIX A
Traffic Scoping
Page 137 of 205
1
Tahera Anjuman
From: Love, Allison C. <LoveAC@scdot.org>
Sent: Wednesday, March 29, 2023 12:43 PM
To: Tahera Anjuman
Cc: Gamble, David D.; Stephen Blackwelder
Subject: RE: Traffic Scoping for SC 160 and Barberville Road TIS Development
Good afternoon, Tahera.
I agree with the times for traffic counts. Please make sure they are recorded while school is in regular session, and not
while school is out for spring break.
Please include these study intersections:
Harbor Bay Drive/Barberville Road
Site Access/Fortson Road
Barberville Road/SC Highway 160/Stock Lane
Lancaster County staff can tell you about any developments in the area that have received site plan or preliminary plat
approval, but have not been built.
It looks like the road into the adjacent subdivision to the north was stubbed as a cul-de-sac for connectivity between the
neighborhood and this parcel. If that is the case, then the Department would support that connection, as the proposed
commercial uses could be patronized by the residents without adding turn movements onto Barberville Road.
Thank you,
Allison
From: Tahera Anjuman <tanjuman@rameykemp.com>
Sent: Friday, March 24, 2023 9:11 AM
To: Love, Allison C. <LoveAC@scdot.org>
Subject: Traffic Scoping for SC 160 and Barberville Road TIS Development
*** This is an EXTERNAL email. Please do not click on a link or open any attachments unless you are
confident it is from a trusted source. ***
Good Morning Allison,
I hope you are doing well. We have a request for a proposal near SC 160 and Barberville Road in Lancaster County.
Please see attached site plan. The development is proposed to consist of a roughly 120 student school/daycare Center,
with additional parcels that are envisioned to include approximately 18,000 SF of retail space and 8,000 SF of office
space. I am assuming the following traffic count for the project between 7-9AM and 4-6PM should be sufficient. Please
let me know your thoughts and what vested developments you would like us to consider for this project. If you have any
other considerations or concerns, please do let me know. I appreciate your guidance.
SC 160 & Barberville Road (S-29-42)
Thanks,
Page 138 of 205
1
Tahera Anjuman
From: Chanda Kirkland <CKirkland@lancastersc.net>
Sent: Friday, May 19, 2023 1:05 PM
To: Tahera Anjuman
Cc: Stephen Blackwelder
Subject: RE: Traffic Scoping for SC 160 and Barberville Road TIS Development
Good Morning Anjuman,
Below are vested projects that may need to be included in the study.
1. The Lodges Development consisting of multi-family apartments, townhomes and cottages.
2. Sugar Creek
3. Redwood
4. Pettus Pond
5. Patterson Preserve
6. Tapestry Patterson Lane Apartments
You can use our online project portal to search the above projects to hopefully get the information you need if no the
engineer contact information is also listed. Hope this information helps.
Chanda
www.mylancastersc.org
Chanda Kirkland, Development Service
Coordinator
Building
Lancaster County Government
PO Box 1809
101 N Main St
Lancaster, SC 29720
P: (803) 416-9390 F: (877) 636-3035
CKirkland@lancastersc.net
CONFIDENTIALITY NOTICE: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain private, restricted and/or
legally privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender
by reply email and destroy all copies of the original message. Please note that any views or opinions presented in this email are solely those of the author and do not
necessarily represent those of Lancaster County. Finally, the recipient should check this email and any attachments for the presence of viruses. Lancaster County
accepts no liability for any damage caused by any virus transmitted by this email.
NOTICE: All email correspondence to and from this address may be subject to public disclosure under the SC Freedom of Information Act.
From: Stephen Blackwelder <sblackwelder@lancastersc.net>
Sent: Thursday, May 18, 2023 1:55 PM
To: Chanda Kirkland <CKirkland@lancastersc.net>
Subject: FW: Traffic Scoping for SC 160 and Barberville Road TIS Development
You don't often get email from ckirkland@lancastersc.net. Learn why this is important
Page 139 of 205
Page 140 of 205
Page 141 of 205
Page 142 of 205
Page 143 of 205
Page 144 of 205
Page 145 of 205
Page 146 of 205
Page 147 of 205
Page 148 of 205
Page 149 of 205
APPENDIX B
Traffic Count Data
Page 150 of 205
BARBERVILLE RD BARBERVILLE RDHARBOR BAY DRHARBOR BAY DR(303) 216-2439www.alltrafficdata.netLocation:1 BARBERVILLE RD & HARBOR BAY DR AMWednesday, May 3, 2023Date:
Peak Rolling Hour Flow Rates
Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - PedestriansTraffic Counts - Motorized VehiclesNote: Total study counts contained in parentheses.Peak Hour:07:30 AM - 08:30 AMPeak 15-Minutes:08:00 AM - 08:15 AM
Heavy Vehicle Percentage and Peak Hour Factor
379 6670064138850150.97NSEW0.910.000.940.83(1,147)(684)()()(40)(101)(1,107)(705)10000001903100369563600HARBOR BAY DRHARBOR BAY DRBARBERVILLE RDBARBERVILLE RD
0000NSEW00000000
0000NSEW00000000LeftThruRightTotalEastboundIntervalStart TimeRollingHourWest East South NorthPedestrian CrossingsU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn7:00 AM 0 1 108 0 0 500 8 0 0 0 0 176 0 0 0 09207 0 0 27:15 AM 0 0 130 0 0 730 11 0 0 0 0 221 0 0 0 01,0193 0 0 47:30 AM 0 2 164 0 0 880 13 0 0 0 0 273 0 0 0 01,0703 0 0 37:45 AM 0 1 147 0 0 910 3 0 0 0 0 250 0 0 0 01,0195 0 0 38:00 AM 0 1 156 0 0 1030 7 0 0 0 0 275 0 0 0 09727 0 0 18:15 AM 0 1 169 0 0 870 8 0 0 0 0 272 0 0 0 04 0 0 38:30 AM 0 7 110 0 0 860 7 0 0 0 0 222 0 0 0 07 0 0 58:45 AM 0 4 106 0 0 830 0 0 0 0 0 203 0 0 0 08 0 0 2Vehicle TypeLeftThruRightEastboundU-TurnWestboundNorthboundSouthboundTotalLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-TurnArticulated Trucks 0 6 0 0 1 00 0 0 0 0 0 70 0 0 0Lights 5 621 0 0 354 1031 0 19 0 0 0 1,0400 0 0 0Mediums 0 9 0 0 14 00 0 0 0 0 0 230 0 0 0Total31 0 19 0 0 0 5 636 0 0 369 10 1,0700 0 0 0LeftThruRightTotalEastboundU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn0.0% 0.0% 0.9% 0.0% 0.0% 0.3%0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.7%0.0% 0.0% 0.0% 0.0%Heavy Vehicle %Heavy Vehicle %Peak Hour FactorPeak Hour Factor0.0% 0.0% 0.9% 0.3% 0.7%0.970.83 0.00 0.94 0.91 0.970.00 0.46 0.94 0.00 0.00 0.900.00 0.67 0.00 0.00 0.00 0.000.81 0.00 0.00 0.60
Page 151 of 205
BARBERVILLE RD STOCK LNSC 160SC 160(303) 216-2439www.alltrafficdata.netLocation:2 BARBERVILLE RD & SC 160 AMWednesday, May 3, 2023Date:
Peak Rolling Hour Flow Rates
Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - PedestriansTraffic Counts - Motorized VehiclesNote: Total study counts contained in parentheses.Peak Hour:07:30 AM - 08:30 AMPeak 15-Minutes:08:15 AM - 08:30 AM
Heavy Vehicle Percentage and Peak Hour Factor
385 645685883001,2848260.97NSEW0.840.910.250.96(1,118)(702)(1,373)(1,594)(1,616)(2,253)(1)(1)2610124120565007595250000000SC 160SC 160BARBERVILLE RDSTOCK LN
0000NSEW00000000
0000NSEW00000000LeftThruRightTotalEastboundIntervalStart TimeRollingHourWest East South NorthPedestrian CrossingsU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn7:00 AM 0 0 0 0 12 00 84 107 0 0 126 398 0 0 0 02,0661 29 0 397:15 AM 0 1 0 0 23 00 112 137 0 0 153 506 0 0 0 02,2540 25 0 557:30 AM 0 0 0 0 29 00 141 169 0 0 137 568 0 0 0 02,3540 31 0 617:45 AM 0 0 0 0 36 00 111 206 0 0 156 594 0 0 0 02,3070 27 0 588:00 AM 0 0 0 0 40 00 140 183 0 0 124 586 0 0 0 02,2630 21 0 788:15 AM 0 0 0 0 19 00 133 201 0 0 148 606 0 0 0 00 41 0 648:30 AM 0 0 0 0 40 00 92 161 0 0 145 521 0 0 0 00 23 0 608:45 AM 0 0 0 0 29 00 73 202 0 0 152 550 0 0 0 00 35 0 59Vehicle TypeLeftThruRightEastboundU-TurnWestboundNorthboundSouthboundTotalLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-TurnArticulated Trucks 0 0 0 0 0 15 6 0 0 7 0 190 0 0 0Lights 0 0 0 118 0 252517 746 0 0 543 114 2,2900 0 0 0Mediums 0 0 0 6 0 83 7 0 0 15 6 450 0 0 0Total525 759 0 0 565 120 0 0 0 124 0 261 2,3540 0 0 0LeftThruRightTotalEastboundU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn0.0% 0.0% 0.0% 0.0% 0.0% 0.0%0.0% 1.0% 0.8% 0.0% 0.0% 1.2% 0.8%0.0% 0.0% 0.0% 0.4%Heavy Vehicle %Heavy Vehicle %Peak Hour FactorPeak Hour Factor0.9% 1.0% 0.0% 0.3% 0.8%0.970.96 0.91 0.25 0.84 0.970.00 0.25 0.00 0.00 0.84 0.000.00 0.93 0.92 0.00 0.00 0.920.25 0.73 0.00 0.84
Page 152 of 205
BARBERVILLE RD BARBERVILLE RDHARBOR BAY DRHARBOR BAY DR(303) 216-2439www.alltrafficdata.netLocation:1 BARBERVILLE RD & HARBOR BAY DR PMWednesday, May 3, 2023Date:
Peak Rolling Hour Flow Rates
Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - PedestriansTraffic Counts - Motorized VehiclesNote: Total study counts contained in parentheses.Peak Hour:05:00 PM - 06:00 PMPeak 15-Minutes:05:45 PM - 06:00 PM
Heavy Vehicle Percentage and Peak Hour Factor
499 4890051151732360.88NSEW0.890.000.790.73(880)(940)()()(76)(56)(913)(953)50000022010004943147901HARBOR BAY DRHARBOR BAY DRBARBERVILLE RDBARBERVILLE RD
0000NSEW00000000
0000NSEW00000000LeftThruRightTotalEastboundIntervalStart TimeRollingHourWest East South NorthPedestrian CrossingsU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn4:00 PM 0 4 83 0 0 830 1 0 0 0 0 179 0 0 0 08674 0 0 44:15 PM 0 10 103 0 0 1140 3 0 0 0 0 239 0 0 0 09397 0 0 24:30 PM 0 4 98 0 0 840 4 0 0 0 0 200 0 0 0 09432 0 0 84:45 PM 0 2 98 0 0 1400 1 0 0 0 0 249 0 0 0 09962 0 0 65:00 PM 0 7 96 0 0 1370 3 0 0 0 0 251 0 0 0 01,0426 0 0 25:15 PM 0 8 115 0 0 1080 2 0 0 0 0 243 0 0 0 09 0 0 15:30 PM 1 7 116 0 0 1230 4 0 0 0 0 253 0 0 0 01 0 0 15:45 PM 0 9 152 0 0 1260 1 0 0 0 0 295 0 0 0 06 0 0 1Vehicle TypeLeftThruRightEastboundU-TurnWestboundNorthboundSouthboundTotalLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-TurnArticulated Trucks 0 1 0 0 2 00 0 0 0 0 0 30 0 0 0Lights 31 472 0 0 483 510 0 20 0 0 0 1,0220 0 1 0Mediums 0 6 0 0 9 00 0 2 0 0 0 170 0 0 0Total10 0 22 0 0 0 31 479 0 0 494 5 1,0420 0 1 0LeftThruRightTotalEastboundU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn0.0% 0.0% 0.2% 0.0% 0.0% 0.4%0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.3%0.0% 0.0% 0.0% 0.0%Heavy Vehicle %Heavy Vehicle %Peak Hour FactorPeak Hour Factor0.0% 0.0% 0.2% 0.4% 0.3%0.880.73 0.00 0.79 0.89 0.880.25 0.86 0.79 0.00 0.00 0.910.00 0.69 0.00 0.00 0.00 0.000.61 0.00 0.00 0.63
Page 153 of 205
BARBERVILLE RD STOCK LNSC 160SC 160(303) 216-2439www.alltrafficdata.netLocation:2 BARBERVILLE RD & SC 160 PMWednesday, May 3, 2023Date:
Peak Rolling Hour Flow Rates
Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - PedestriansTraffic Counts - Motorized VehiclesNote: Total study counts contained in parentheses.Peak Hour:05:00 PM - 06:00 PMPeak 15-Minutes:05:45 PM - 06:00 PM
Heavy Vehicle Percentage and Peak Hour Factor
511 5148971,151101,0978410.95NSEW0.960.880.500.97(917)(951)(1,738)(2,006)(1,899)(2,131)(3)(1)1450366202695007853120001000SC 160SC 160BARBERVILLE RDSTOCK LN
0000NSEW00000000
0000NSEW00000000LeftThruRightTotalEastboundIntervalStart TimeRollingHourWest East South NorthPedestrian CrossingsU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn4:00 PM 0 1 0 0 23 00 71 178 0 0 166 535 0 0 0 02,3171 24 0 714:15 PM 0 0 1 0 22 00 70 193 0 0 196 597 0 0 0 02,3660 32 0 834:30 PM 0 0 0 0 30 00 78 180 0 0 157 551 0 0 0 02,4130 31 0 754:45 PM 0 0 0 0 31 00 65 198 0 0 204 634 0 0 0 02,4780 31 0 1055:00 PM 0 0 0 0 71 00 75 183 0 0 166 584 0 0 0 02,5060 35 0 545:15 PM 0 0 0 0 96 00 70 209 0 0 190 644 0 0 0 00 48 0 315:30 PM 0 1 0 0 104 00 84 194 0 0 158 616 0 0 0 00 45 0 305:45 PM 0 0 0 0 95 00 83 199 0 0 181 662 0 0 0 00 74 0 30Vehicle TypeLeftThruRightEastboundU-TurnWestboundNorthboundSouthboundTotalLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-TurnArticulated Trucks 0 0 0 1 0 11 3 0 0 4 0 100 0 0 0Lights 1 0 0 358 0 143308 775 0 0 687 200 2,4720 0 0 0Mediums 0 0 0 7 0 13 7 0 0 4 2 240 0 0 0Total312 785 0 0 695 202 1 0 0 366 0 145 2,5060 0 0 0LeftThruRightTotalEastboundU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn0.0% 0.0% 0.0% 0.0% 0.3% 0.0%0.0% 0.3% 0.4% 0.0% 0.0% 0.6% 0.4%0.0% 0.0% 0.0% 0.7%Heavy Vehicle %Heavy Vehicle %Peak Hour FactorPeak Hour Factor0.4% 0.4% 0.0% 0.4% 0.4%0.950.97 0.88 0.50 0.96 0.950.00 0.25 0.25 0.00 0.88 0.000.00 0.93 0.94 0.00 0.00 0.890.25 0.68 0.00 0.80
Page 154 of 205
APPENDIX C
Traffic Volume Development Worksheets and ITE Trip
Generation Worksheets
Page 155 of 205
TRAFFIC CONTROL:
DATE COUNTED:
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
525 759 0 0 565 120 0 0 0 124 0 261
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
3 3 3 3 3 3 3 3 3 3 3 3
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
16 23 0 0 17 4 0 0 0 4 0 8
0 13 38 13 4 0
10 8 8 29
1 1 3 3
4 2 6 11
7 3 10 20
26 13
22 39 51 27 31 63
573 821 0 0 633 159 0 0 0 167 0 361
50% 20%
20% 50%
41 16
12 31
41 16 12 31
614 821 0 0 633 175 0 0 0 179 0 392
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
312 785 0 0 695 202 1 0 0 366 0 145
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
3 3 3 3 3 3 3 3 3 3 3 3
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
9 24 0 0 21 6 0 0 0 11 0 4
0 39 24 8 13 0
32 3 5 19
3 3 1 2
13 6 4 7
23 11 7 12
17 9
71 56 33 31 30 40
424 865 0 0 749 242 1 0 0 412 0 208
50% 20%
20% 50%
53 20
23 58
53 20 23 58
477 865 0 0 749 262 1 0 0 435 0 266
Vested Trips (Redwood)
Vested Trips (Pettus Pond)
Vested Trips (The Lodges)
Vested Trips (The Lodges)
Inbound Trip Distribution Percentage
Outbound Trip Distribution Percentage
PM PEAK HOUR (5:00-6:00 PM)
2023 TRAFFIC VOLUMES
Vested Trips (Patterson Lane Appartments)
Years To Buildout (2026)
Yearly Growth Rate
Background Traffic Growth
Vested Trips (Sugar Creek)
Vested Trips (Patterson Preserve)
Heavy Vehicle Percentage
2026 NO-BUILD TRAFFIC VOLUMES
Inbound New Project Traffic
Outbound New Project Traffic
Total New Project Traffic
2026 BUILD TRAFFIC VOLUMES
Inbound Trip Distribution Percentage
Outbound Trip Distribution Percentage
Pass-By Project Traffic
Background Traffic Growth
Vested Trips (Patterson Preserve)
Vested Trips (Patterson Lane Appartments)
Vested Traffic Volumes
Vested Trips (Sugar Creek)
Vested Trips (Redwood)
Vested Trips (Pettus Pond)
INTERSECTION TRAFFIC VOLUME DEVELOPMENT
Fort Mill Highway & Barberville Road
Signalized
Wednesday, May 3, 2023
AM PEAK HOUR (7:30-8:30 AM)
Total New Project Traffic
Pass-by Project Traffic
2026 BUILD TRAFFIC VOLUMES
Vested Traffic Volumes
2026 NO-BUILD TRAFFIC VOLUMES
Inbound New Project Traffic
Outbound New Project Traffic
Yearly Growth Rate
Years To Buildout (2026)
2023 TRAFFIC VOLUMES
Heavy Vehicle Percentage
Page 156 of 205
TRAFFIC CONTROL:
DATE COUNTED:
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
31 0 19 0 0 0 5 636 0 0 369 10
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
3 3 3 3 3 3 3 3 3 3 3 3
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
1 0 1 0 0 0 0 19 0 0 11 0
13 4
18 37
2 6
6 17
10 30
0 0
49 94
32 0 20 0 0 0 5 722 0 0 511 10
30%
30%
25
18
18 25
32 0 20 0 0 0 5 740 0 0 536 10
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
10 0 22 0 0 0 32 479 0 0 494 5
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
3 3 3 3 3 3 3 3 3 3 3 3
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
0 0 1 0 0 0 1 14 0 0 15 0
8 13
35 24
6 3
19 11
34 19
0 0
102 70
10 0 23 0 0 0 33 630 0 0 603 5
30%
30%
32
35
35 32
10 0 23 0 0 0 33 665 0 0 635 5
Vested Trips (The Lodges)
Vested Trips (The Lodges)
INTERSECTION TRAFFIC VOLUME DEVELOPMENT
Barberville Road & Harbor Bay Drive
Unsignalized
Wednesday, May 3, 2023
AM PEAK HOUR (7:30-8:30 AM)
2023 TRAFFIC VOLUMES
Heavy Vehicle Percentage
Years To Buildout (2026)
Yearly Growth Rate
Pass-By Project Traffic
Background Traffic Growth
Vested Trips (Sugar Creek)
Vested Trips (Patterson Preserve)
Vested Trips (Patterson Lane Appartments)
Vested Traffic Volumes
2026 NO-BUILD TRAFFIC VOLUMES
Inbound Trip Distribution Percentage
Outbound Trip Distribution Percentage
Inbound New Project Traffic
Outbound New Project Traffic
Vested Trips (Redwood)
Vested Trips (Pettus Pond)
Total New Project Traffic
2026 BUILD TRAFFIC VOLUMES
PM PEAK HOUR (5:00-6:00 PM)
2023 TRAFFIC VOLUMES
Background Traffic Growth
Heavy Vehicle Percentage
Years To Buildout (2026)
Yearly Growth Rate
2026 BUILD TRAFFIC VOLUMES
Vested Trips (Sugar Creek)
Vested Trips (Patterson Preserve)
Vested Trips (Patterson Lane Appartments)
Vested Traffic Volumes
2026 NO-BUILD TRAFFIC VOLUMES
Inbound Trip Distribution Percentage
Outbound Trip Distribution Percentage
Inbound New Project Traffic
Outbound New Project Traffic
Pass-by Project Traffic
Total New Project Traffic
Vested Trips (Redwood)
Vested Trips (Pettus Pond)
Page 157 of 205
TRAFFIC CONTROL:
DATE COUNTED:
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
0 0 0 0 0 0 0 641 0 0 388 0
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
3 3 3 3 3 3 3 3 3 3 3 3
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
0 0 0 0 0 0 0 19 0 0 12 0
13 4
18 37
2 6
6 17
10 30
0 0
49 94
0 0 0 0 0 0 0 727 0 0 531 0
70% 30%
30% 70%
57 25
18 43
18 43 57 25
18 0 43 0 0 0 57 727 0 0 531 25
EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
0 0 0 0 0 0 0 511 0 0 516 0
2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
3 3 3 3 3 3 3 3 3 3 3 3
1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0%
0 0 0 0 0 0 0 15 0 0 15 0
8 13
35 24
6 3
19 11
34 19
0 0
102 70
0 0 0 0 0 0 0 663 0 0 625 0
70% 30%
30% 70%
73 32
35 81
35 81 73 32
35 0 81 0 0 0 73 663 0 0 625 32
Vested Trips (The Lodges)
Vested Trips (The Lodges)
INTERSECTION TRAFFIC VOLUME DEVELOPMENT
Barberville Road & Fortson Road/ Site Access
Unsignalized
AM PEAK HOUR (7:30-8:30 AM)
2023 TRAFFIC VOLUMES
Heavy Vehicle Percentage
Years To Buildout (2026)
Yearly Growth Rate
Pass-By Project Traffic
Background Traffic Growth
Vested Trips (Sugar Creek)
Vested Trips (Patterson Preserve)
Vested Trips (Patterson Lane Appartments)
Vested Traffic Volumes
2026 NO-BUILD TRAFFIC VOLUMES
Inbound Trip Distribution Percentage
Outbound Trip Distribution Percentage
Inbound New Project Traffic
Outbound New Project Traffic
Vested Trips (Redwood)
Vested Trips (Pettus Pond)
Total New Project Traffic
2026 BUILD TRAFFIC VOLUMES
PM PEAK HOUR (5:00-6:00 PM)
2023 TRAFFIC VOLUMES
Background Traffic Growth
Heavy Vehicle Percentage
Years To Buildout (2026)
Yearly Growth Rate
2026 BUILD TRAFFIC VOLUMES
Vested Trips (Sugar Creek)
Vested Trips (Patterson Preserve)
Vested Trips (Patterson Lane Appartments)
Vested Traffic Volumes
2026 NO-BUILD TRAFFIC VOLUMES
Inbound Trip Distribution Percentage
Outbound Trip Distribution Percentage
Inbound New Project Traffic
Outbound New Project Traffic
Pass-by Project Traffic
Total New Project Traffic
Vested Trips (Redwood)
Vested Trips (Pettus Pond)
Page 158 of 205
Page 159 of 205
Page 160 of 205
Page 161 of 205
Page 162 of 205
Page 163 of 205
Page 164 of 205
Page 165 of 205
Page 166 of 205
Page 167 of 205
APPENDIX D
Turn Lane Analysis Worksheets
Page 168 of 205
INTERSECTION: Barberville Road & Site Access
MOVEMENT: Northbound left turn
SCENARIO Advancing Volume
(Va)
Northbound left
turn
Opposing Volume
(Vo) Left Turn % of Va Symbol
AM Build 784 57 556 7.3%
PM Build 736 73 657 9.9%
.
Barberville Road TIS
LEFT-TURN LANE WARRANT REVIEW
AM BuildPM Build
`
`
Page 169 of 205
INTERSECTION: Barberville Road & Site Access
MOVEMENT: Southbound right turn
SCENARIO Design Hour
Volume Right Turn Volume Symbol
AM Build 556 25
PM Build 657 32
Barberville Road TIS
RIGHT-TURN LANE WARRANT REVIEW
`
AMBuildPMBuild
Page 170 of 205
APPENDIX E
Capacity Analysis
Page 171 of 205
2023 Existing Conditions
Page 172 of 205
HCM 6th Signalized Intersection Summary Barberville Road TIS
100: Fort Mill Highway & Barberville Road 2023 Existing AM
RKA Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 525 759 0 0 565 120 0 0 0 124 0 261
Future Volume (veh/h) 525 759 0 0 565 120 0 0 0 124 0 261
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847
Adj Flow Rate, veh/h 571 825 0 0 614 130 0 0 0 135 0 284
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 540 1367 0 0 763 918 0 2 0 316 0 282
Arrive On Green 0.18 0.67 0.00 0.00 0.43 0.43 0.00 0.00 0.00 0.18 0.00 0.18
Sat Flow, veh/h 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565
Grp Volume(v), veh/h 571 825 0 0 614 130 0 0 0 135 0 284
Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565
Q Serve(g_s), s 14.9 18.3 0.0 0.0 24.6 3.0 0.0 0.0 0.0 5.6 0.0 14.7
Cycle Q Clear(g_c), s 14.9 18.3 0.0 0.0 24.6 3.0 0.0 0.0 0.0 5.6 0.0 14.7
Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 540 1367 0 0 763 918 0 2 0 316 0 282
V/C Ratio(X) 1.06 0.60 0.00 0.00 0.80 0.14 0.00 0.00 0.00 0.43 0.00 1.01
Avail Cap(c_a), veh/h 540 1697 0 0 1052 1162 0 470 0 316 0 282
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 19.5 7.3 0.0 0.0 20.3 6.8 0.0 0.0 0.0 29.8 0.0 33.5
Incr Delay (d2), s/veh 54.9 0.3 0.0 0.0 2.8 0.1 0.0 0.0 0.0 0.9 0.0 55.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 13.6 5.4 0.0 0.0 9.4 1.3 0.0 0.0 0.0 2.3 0.0 9.6
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 74.4 7.6 0.0 0.0 23.1 6.9 0.0 0.0 0.0 30.7 0.0 89.3
LnGrp LOS F A A A C A A A A C A F
Approach Vol, veh/h 1396 744 0 419
Approach Delay, s/veh 34.9 20.3 0.0 70.4
Approach LOS C C E
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 61.7 0.0 20.0 41.7 20.0
Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3
Max Green Setting (Gmax), s * 68 * 20 14.9 * 48 14.7
Max Q Clear Time (g_c+I1), s 20.3 0.0 16.9 26.6 16.7
Green Ext Time (p_c), s 21.2 0.0 0.0 8.5 0.0
Intersection Summary
HCM 6th Ctrl Delay 36.5
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Page 173 of 205
HCM 6th TWSC Barberville Road TIS
200: Barberville Road & Harbor Bay Drive 2023 Existing AM
RKA Synchro 11 Report
Intersection
Int Delay, s/veh 1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 31 19 5 636 369 10
Future Vol, veh/h 31 19 5 636 369 10
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 34 21 5 691 401 11
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1108 407 412 0 - 0
Stage 1 407 - - - - -
Stage 2 701 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 232 644 1147 - - -
Stage 1 672 - - - - -
Stage 2 492 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 230 644 1147 - - -
Mov Cap-2 Maneuver 230 - - - - -
Stage 1 667 - - - - -
Stage 2 492 - - - - -
Approach EB NB SB
HCM Control Delay, s 19.4 0.1 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1147 - 304 - -
HCM Lane V/C Ratio 0.005 - 0.179 - -
HCM Control Delay (s) 8.2 0 19.4 - -
HCM Lane LOS A A C - -
HCM 95th %tile Q(veh) 0 - 0.6 - -
Page 174 of 205
HCM 6th Signalized Intersection Summary Barberville Road TIS
100: Fort Mill Highway & Barberville Road 2023 Existing PM
RKA Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 312 785 0 0 695 202 1 0 0 366 0 145
Future Volume (veh/h) 312 785 0 0 695 202 1 0 0 366 0 145
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847
Adj Flow Rate, veh/h 339 853 0 0 755 220 1 0 0 398 0 158
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 381 1335 0 0 843 950 4 0 0 275 0 245
Arrive On Green 0.13 0.66 0.00 0.00 0.47 0.47 0.00 0.00 0.00 0.16 0.00 0.16
Sat Flow, veh/h 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565
Grp Volume(v), veh/h 339 853 0 0 755 220 1 0 0 398 0 158
Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565
Q Serve(g_s), s 9.7 23.3 0.0 0.0 36.5 5.9 0.1 0.0 0.0 14.7 0.0 8.9
Cycle Q Clear(g_c), s 9.7 23.3 0.0 0.0 36.5 5.9 0.1 0.0 0.0 14.7 0.0 8.9
Prop In Lane 1.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 381 1335 0 0 843 950 4 0 0 275 0 245
V/C Ratio(X) 0.89 0.64 0.00 0.00 0.90 0.23 0.25 0.00 0.00 1.45 0.00 0.65
Avail Cap(c_a), veh/h 436 1474 0 0 914 1009 389 0 0 275 0 245
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 23.8 9.5 0.0 0.0 22.6 7.5 46.9 0.0 0.0 39.7 0.0 37.3
Incr Delay (d2), s/veh 18.1 0.7 0.0 0.0 10.6 0.1 28.7 0.0 0.0 221.0 0.0 5.8
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 5.7 8.2 0.0 0.0 15.9 2.6 0.1 0.0 0.0 23.0 0.0 3.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 41.9 10.2 0.0 0.0 33.2 7.6 75.5 0.0 0.0 260.7 0.0 43.0
LnGrp LOS D B A A C A E A A F A D
Approach Vol, veh/h 1192 975 1 556
Approach Delay, s/veh 19.2 27.4 75.5 198.9
Approach LOS B C E F
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 68.6 5.5 17.3 51.3 20.0
Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3
Max Green Setting (Gmax), s * 68 * 20 14.9 * 48 14.7
Max Q Clear Time (g_c+I1), s 25.3 2.1 11.7 38.5 16.7
Green Ext Time (p_c), s 21.2 0.0 0.5 6.1 0.0
Intersection Summary
HCM 6th Ctrl Delay 58.8
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Page 175 of 205
HCM 6th TWSC Barberville Road TIS
200: Barberville Road & Harbor Bay Drive 2023 Existing PM
RKA Synchro 11 Report
Intersection
Int Delay, s/veh 0.7
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 22 32 479 494 5
Future Vol, veh/h 10 22 32 479 494 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 11 24 35 521 537 5
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1131 540 542 0 - 0
Stage 1 540 - - - - -
Stage 2 591 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 225 542 1027 - - -
Stage 1 584 - - - - -
Stage 2 553 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 214 542 1027 - - -
Mov Cap-2 Maneuver 214 - - - - -
Stage 1 556 - - - - -
Stage 2 553 - - - - -
Approach EB NB SB
HCM Control Delay, s 15.9 0.5 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1027 - 366 - -
HCM Lane V/C Ratio 0.034 - 0.095 - -
HCM Control Delay (s) 8.6 0 15.9 - -
HCM Lane LOS A A C - -
HCM 95th %tile Q(veh) 0.1 - 0.3 - -
Page 176 of 205
2026 No-Build Conditions
Page 177 of 205
HCM 6th Signalized Intersection Summary Barberville Road TIS
100: Fort Mill Highway & Barberville Road 2026 No- Build AM
RKA Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 573 821 0 0 633 159 0 0 0 167 0 361
Future Volume (veh/h) 573 821 0 0 633 159 0 0 0 167 0 361
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847
Adj Flow Rate, veh/h 623 892 0 0 688 173 0 0 0 182 0 392
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 525 1341 0 0 672 929 0 2 0 421 0 374
Arrive On Green 0.24 0.66 0.00 0.00 0.38 0.38 0.00 0.00 0.00 0.24 0.00 0.24
Sat Flow, veh/h 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565
Grp Volume(v), veh/h 623 892 0 0 688 173 0 0 0 182 0 392
Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565
Q Serve(g_s), s 28.9 31.9 0.0 0.0 45.4 6.0 0.0 0.0 0.0 10.5 0.0 28.7
Cycle Q Clear(g_c), s 28.9 31.9 0.0 0.0 45.4 6.0 0.0 0.0 0.0 10.5 0.0 28.7
Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 525 1341 0 0 672 929 0 2 0 421 0 374
V/C Ratio(X) 1.19 0.66 0.00 0.00 1.02 0.19 0.00 0.00 0.00 0.43 0.00 1.05
Avail Cap(c_a), veh/h 525 1341 0 0 672 929 0 141 0 421 0 374
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 38.9 12.3 0.0 0.0 37.3 9.9 0.0 0.0 0.0 38.7 0.0 45.7
Incr Delay (d2), s/veh 102.0 2.6 0.0 0.0 40.9 0.4 0.0 0.0 0.0 0.7 0.0 59.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 29.0 13.3 0.0 0.0 26.2 3.5 0.0 0.0 0.0 4.5 0.0 17.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 140.9 14.9 0.0 0.0 78.2 10.4 0.0 0.0 0.0 39.4 0.0 105.1
LnGrp LOS F B A A F B A A A D A F
Approach Vol, veh/h 1515 861 0 574
Approach Delay, s/veh 66.7 64.6 0.0 84.3
Approach LOS E E F
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 86.0 34.0 34.0 52.0 0.0
Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3
Max Green Setting (Gmax), s * 65 * 29 28.9 * 31 8.7
Max Q Clear Time (g_c+I1), s 33.9 30.7 30.9 47.4 0.0
Green Ext Time (p_c), s 18.7 0.0 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 69.5
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Page 178 of 205
HCM 6th TWSC Barberville Road TIS
200: Barberville Road & Harbor Bay Drive 2026 No- Build AM
RKA Synchro 11 Report
Intersection
Int Delay, s/veh 1.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 32 20 5 722 511 10
Future Vol, veh/h 32 20 5 722 511 10
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 35 22 5 785 555 11
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1356 561 566 0 - 0
Stage 1 561 - - - - -
Stage 2 795 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 165 527 1006 - - -
Stage 1 571 - - - - -
Stage 2 445 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 164 527 1006 - - -
Mov Cap-2 Maneuver 164 - - - - -
Stage 1 566 - - - - -
Stage 2 445 - - - - -
Approach EB NB SB
HCM Control Delay, s 26.5 0.1 0
HCM LOS D
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1006 - 223 - -
HCM Lane V/C Ratio 0.005 - 0.253 - -
HCM Control Delay (s) 8.6 0 26.5 - -
HCM Lane LOS A A D - -
HCM 95th %tile Q(veh) 0 - 1 - -
Page 179 of 205
HCM 6th Signalized Intersection Summary Barberville Road TIS
100: Fort Mill Highway & Barberville Road 2026 No- Build PM
RKA Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 424 865 0 0 749 242 1 0 0 412 0 208
Future Volume (veh/h) 424 865 0 0 749 242 1 0 0 412 0 208
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847
Adj Flow Rate, veh/h 461 940 0 0 814 263 1 0 0 448 0 226
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 493 1247 0 0 619 885 4 0 0 421 0 374
Arrive On Green 0.22 0.62 0.00 0.00 0.35 0.35 0.00 0.00 0.00 0.24 0.00 0.24
Sat Flow, veh/h 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565
Grp Volume(v), veh/h 461 940 0 0 814 263 1 0 0 448 0 226
Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565
Q Serve(g_s), s 24.3 39.9 0.0 0.0 41.8 10.5 0.1 0.0 0.0 28.7 0.0 15.4
Cycle Q Clear(g_c), s 24.3 39.9 0.0 0.0 41.8 10.5 0.1 0.0 0.0 28.7 0.0 15.4
Prop In Lane 1.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 493 1247 0 0 619 885 4 0 0 421 0 374
V/C Ratio(X) 0.93 0.75 0.00 0.00 1.32 0.30 0.25 0.00 0.00 1.06 0.00 0.60
Avail Cap(c_a), veh/h 525 1247 0 0 619 885 135 0 0 421 0 374
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 37.5 16.6 0.0 0.0 39.1 12.4 59.8 0.0 0.0 45.7 0.0 40.6
Incr Delay (d2), s/veh 23.5 4.2 0.0 0.0 153.1 0.9 28.9 0.0 0.0 62.2 0.0 2.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 16.1 17.7 0.0 0.0 43.5 6.0 0.1 0.0 0.0 19.4 0.0 6.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 61.0 20.8 0.0 0.0 192.1 13.2 88.7 0.0 0.0 107.9 0.0 43.3
LnGrp LOS E C A A F B F A A F A D
Approach Vol, veh/h 1401 1077 1 674
Approach Delay, s/veh 34.0 148.5 88.7 86.2
Approach LOS C F F F
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 80.4 34.0 32.0 48.4 5.6
Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3
Max Green Setting (Gmax), s * 65 * 29 28.9 * 31 8.7
Max Q Clear Time (g_c+I1), s 41.9 30.7 26.3 43.8 2.1
Green Ext Time (p_c), s 16.2 0.0 0.6 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 84.3
HCM 6th LOS F
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Page 180 of 205
HCM 6th TWSC Barberville Road TIS
200: Barberville Road & Harbor Bay Drive 2026 No- Build PM
RKA Synchro 11 Report
Intersection
Int Delay, s/veh 0.7
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 23 33 630 603 5
Future Vol, veh/h 10 23 33 630 603 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 11 25 36 685 655 5
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1415 658 660 0 - 0
Stage 1 658 - - - - -
Stage 2 757 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 151 464 928 - - -
Stage 1 515 - - - - -
Stage 2 463 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 141 464 928 - - -
Mov Cap-2 Maneuver 141 - - - - -
Stage 1 483 - - - - -
Stage 2 463 - - - - -
Approach EB NB SB
HCM Control Delay, s 20.1 0.4 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 928 - 274 - -
HCM Lane V/C Ratio 0.039 - 0.131 - -
HCM Control Delay (s) 9 0 20.1 - -
HCM Lane LOS A A C - -
HCM 95th %tile Q(veh) 0.1 - 0.4 - -
Page 181 of 205
2026 Build Conditions
Page 182 of 205
HCM 6th Signalized Intersection Summary Barberville Road TIS
100: Fort Mill Highway & Barberville Road 2026 Build AM
RKA Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 582 782 0 0 582 140 0 0 0 140 0 300
Future Volume (veh/h) 582 782 0 0 582 140 0 0 0 140 0 300
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847
Adj Flow Rate, veh/h 633 850 0 0 633 152 0 0 0 152 0 326
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 520 1324 0 0 691 586 0 439 0 469 0 353
Arrive On Green 0.21 0.65 0.00 0.00 0.39 0.39 0.00 0.00 0.00 0.23 0.00 0.23
Sat Flow, veh/h 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565
Grp Volume(v), veh/h 633 850 0 0 633 152 0 0 0 152 0 326
Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565
Q Serve(g_s), s 20.9 24.7 0.0 0.0 33.3 6.8 0.0 0.0 0.0 7.2 0.0 20.1
Cycle Q Clear(g_c), s 20.9 24.7 0.0 0.0 33.3 6.8 0.0 0.0 0.0 7.2 0.0 20.1
Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 520 1324 0 0 691 586 0 439 0 469 0 353
V/C Ratio(X) 1.22 0.64 0.00 0.00 0.92 0.26 0.00 0.00 0.00 0.32 0.00 0.92
Avail Cap(c_a), veh/h 520 1366 0 0 728 617 0 439 0 478 0 360
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 28.5 10.2 0.0 0.0 28.6 20.5 0.0 0.0 0.0 32.4 0.0 37.4
Incr Delay (d2), s/veh 114.0 0.9 0.0 0.0 15.7 0.2 0.0 0.0 0.0 0.4 0.0 28.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 28.2 9.1 0.0 0.0 16.0 2.3 0.0 0.0 0.0 3.0 0.0 10.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 142.4 11.1 0.0 0.0 44.2 20.6 0.0 0.0 0.0 32.8 0.0 66.1
LnGrp LOS F B A A D C A A A C A E
Approach Vol, veh/h 1483 785 0 478
Approach Delay, s/veh 67.2 39.7 0.0 55.5
Approach LOS E D E
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 71.0 27.6 26.0 45.0 27.6
Change Period (Y+Rc), s * 6.6 * 5.4 5.1 * 6.6 5.4
Max Green Setting (Gmax), s * 66 * 23 20.9 * 40 8.6
Max Q Clear Time (g_c+I1), s 26.7 22.1 22.9 35.3 0.0
Green Ext Time (p_c), s 20.2 0.1 0.0 3.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 57.3
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Page 183 of 205
HCM 6th TWSC Barberville Road TIS
200: Barberville Road & Harbor Bay Drive 2026 Build AM
RKA Synchro 11 Report
Intersection
Int Delay, s/veh 1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 32 20 5 673 405 10
Future Vol, veh/h 32 20 5 673 405 10
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 35 22 5 732 440 11
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1188 446 451 0 - 0
Stage 1 446 - - - - -
Stage 2 742 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 208 612 1109 - - -
Stage 1 645 - - - - -
Stage 2 471 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 206 612 1109 - - -
Mov Cap-2 Maneuver 206 - - - - -
Stage 1 640 - - - - -
Stage 2 471 - - - - -
Approach EB NB SB
HCM Control Delay, s 21.3 0.1 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1109 - 277 - -
HCM Lane V/C Ratio 0.005 - 0.204 - -
HCM Control Delay (s) 8.3 0 21.3 - -
HCM Lane LOS A A C - -
HCM 95th %tile Q(veh) 0 - 0.7 - -
Page 184 of 205
HCM 6th TWSC Barberville Road TIS
300: Barberville Road & Site Access 2026 Build AM
RKA Synchro 11 Report
Intersection
Int Delay, s/veh 1.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 43 57 714 527 25
Future Vol, veh/h 18 43 57 714 527 25
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 50 0 150 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 20 47 62 776 573 27
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1487 587 600 0 - 0
Stage 1 587 - - - - -
Stage 2 900 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 137 510 977 - - -
Stage 1 556 - - - - -
Stage 2 397 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 128 510 977 - - -
Mov Cap-2 Maneuver 128 - - - - -
Stage 1 521 - - - - -
Stage 2 397 - - - - -
Approach EB NB SB
HCM Control Delay, s 20.3 0.7 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity (veh/h) 977 - 128 510 - -
HCM Lane V/C Ratio 0.063 - 0.153 0.092 - -
HCM Control Delay (s) 8.9 - 38.1 12.8 - -
HCM Lane LOS A - E B - -
HCM 95th %tile Q(veh) 0.2 - 0.5 0.3 - -
Page 185 of 205
HCM 6th Signalized Intersection Summary Barberville Road TIS
100: Fort Mill Highway & Barberville Road 2026 Build PM
RKA Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 477 865 0 0 749 262 1 0 0 435 0 266
Future Volume (veh/h) 477 865 0 0 749 262 1 0 0 435 0 266
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847
Adj Flow Rate, veh/h 518 940 0 0 814 285 1 0 0 473 0 289
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 525 1247 0 0 590 860 4 0 0 421 0 374
Arrive On Green 0.24 0.62 0.00 0.00 0.33 0.33 0.00 0.00 0.00 0.24 0.00 0.24
Sat Flow, veh/h 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565
Grp Volume(v), veh/h 518 940 0 0 814 285 1 0 0 473 0 289
Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565
Q Serve(g_s), s 28.3 39.9 0.0 0.0 39.8 12.0 0.1 0.0 0.0 28.7 0.0 20.7
Cycle Q Clear(g_c), s 28.3 39.9 0.0 0.0 39.8 12.0 0.1 0.0 0.0 28.7 0.0 20.7
Prop In Lane 1.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 525 1247 0 0 590 860 4 0 0 421 0 374
V/C Ratio(X) 0.99 0.75 0.00 0.00 1.38 0.33 0.25 0.00 0.00 1.12 0.00 0.77
Avail Cap(c_a), veh/h 525 1247 0 0 590 860 135 0 0 421 0 374
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 38.0 16.6 0.0 0.0 40.1 13.6 59.8 0.0 0.0 45.7 0.0 42.6
Incr Delay (d2), s/veh 35.7 4.2 0.0 0.0 181.7 1.0 28.9 0.0 0.0 82.3 0.0 9.6
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 19.9 17.7 0.0 0.0 46.2 6.8 0.1 0.0 0.0 21.8 0.0 8.8
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 73.7 20.8 0.0 0.0 221.7 14.6 88.7 0.0 0.0 127.9 0.0 52.2
LnGrp LOS E C A A F B F A A F A D
Approach Vol, veh/h 1458 1099 1 762
Approach Delay, s/veh 39.6 168.0 88.7 99.2
Approach LOS D F F F
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 80.4 34.0 34.0 46.4 5.6
Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3
Max Green Setting (Gmax), s * 65 * 29 28.9 * 31 8.7
Max Q Clear Time (g_c+I1), s 41.9 30.7 30.3 41.8 2.1
Green Ext Time (p_c), s 16.2 0.0 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 95.8
HCM 6th LOS F
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Page 186 of 205
HCM 6th TWSC Barberville Road TIS
200: Barberville Road & Harbor Bay Drive 2026 Build PM
RKA Synchro 11 Report
Intersection
Int Delay, s/veh 0.7
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 23 33 665 635 5
Future Vol, veh/h 10 23 33 665 635 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 11 25 36 723 690 5
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1488 693 695 0 - 0
Stage 1 693 - - - - -
Stage 2 795 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 137 443 901 - - -
Stage 1 496 - - - - -
Stage 2 445 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 128 443 901 - - -
Mov Cap-2 Maneuver 128 - - - - -
Stage 1 463 - - - - -
Stage 2 445 - - - - -
Approach EB NB SB
HCM Control Delay, s 21.5 0.4 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 901 - 254 - -
HCM Lane V/C Ratio 0.04 - 0.141 - -
HCM Control Delay (s) 9.2 0 21.5 - -
HCM Lane LOS A A C - -
HCM 95th %tile Q(veh) 0.1 - 0.5 - -
Page 187 of 205
HCM 6th TWSC Barberville Road TIS
300: Barberville Road & Site Access 2026 Build PM
RKA Synchro 11 Report
Intersection
Int Delay, s/veh 2.5
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 35 81 73 663 625 32
Future Vol, veh/h 35 81 73 663 625 32
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 50 0 150 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 38 88 79 721 679 35
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1576 697 714 0 - 0
Stage 1 697 - - - - -
Stage 2 879 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 121 441 886 - - -
Stage 1 494 - - - - -
Stage 2 406 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 110 441 886 - - -
Mov Cap-2 Maneuver 110 - - - - -
Stage 1 450 - - - - -
Stage 2 406 - - - - -
Approach EB NB SB
HCM Control Delay, s 26.9 0.9 0
HCM LOS D
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity (veh/h) 886 - 110 441 - -
HCM Lane V/C Ratio 0.09 - 0.346 0.2 - -
HCM Control Delay (s) 9.5 - 54.1 15.2 - -
HCM Lane LOS A - F C - -
HCM 95th %tile Q(veh) 0.3 - 1.4 0.7 - -
Page 188 of 205
HCM 6th Signalized Intersection Summary Barberville Road TIS
100: Fort Mill Highway & Barberville Road 2026 Build Improved AM
RKA Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 614 821 0 0 633 175 0 0 0 179 0 392
Future Volume (veh/h) 614 821 0 0 633 175 0 0 0 179 0 392
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847
Adj Flow Rate, veh/h 667 892 0 0 688 190 0 0 0 195 0 426
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 654 2452 0 0 1192 929 0 2 0 465 0 413
Arrive On Green 0.24 0.64 0.00 0.00 0.35 0.35 0.00 0.00 0.00 0.26 0.00 0.26
Sat Flow, veh/h 1931 3953 0 0 3463 1505 0 1949 0 1759 0 1565
Grp Volume(v), veh/h 667 892 0 0 688 190 0 0 0 195 0 426
Grp Sat Flow(s),veh/h/ln 1931 1926 0 0 1687 1505 0 1949 0 1759 0 1565
Q Serve(g_s), s 28.9 13.1 0.0 0.0 19.9 6.6 0.0 0.0 0.0 11.0 0.0 31.7
Cycle Q Clear(g_c), s 28.9 13.1 0.0 0.0 19.9 6.6 0.0 0.0 0.0 11.0 0.0 31.7
Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 654 2452 0 0 1192 929 0 2 0 465 0 413
V/C Ratio(X) 1.02 0.36 0.00 0.00 0.58 0.20 0.00 0.00 0.00 0.42 0.00 1.03
Avail Cap(c_a), veh/h 654 2452 0 0 1192 929 0 141 0 465 0 413
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 25.7 10.3 0.0 0.0 31.5 10.0 0.0 0.0 0.0 36.5 0.0 44.2
Incr Delay (d2), s/veh 40.5 0.4 0.0 0.0 2.0 0.5 0.0 0.0 0.0 0.6 0.0 52.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 16.6 5.1 0.0 0.0 8.1 4.0 0.0 0.0 0.0 4.7 0.0 17.9
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 66.2 10.7 0.0 0.0 33.6 10.5 0.0 0.0 0.0 37.1 0.0 96.4
LnGrp LOS F B A A C B A A A D A F
Approach Vol, veh/h 1559 878 0 621
Approach Delay, s/veh 34.5 28.6 0.0 77.8
Approach LOS C C E
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 83.0 37.0 34.0 49.0 0.0
Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3
Max Green Setting (Gmax), s * 62 * 32 28.9 * 28 8.7
Max Q Clear Time (g_c+I1), s 15.1 33.7 30.9 21.9 0.0
Green Ext Time (p_c), s 20.1 0.0 0.0 3.8 0.0
Intersection Summary
HCM 6th Ctrl Delay 41.6
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Page 189 of 205
HCM 6th Signalized Intersection Summary Barberville Road TIS
100: Fort Mill Highway & Barberville Road 2026 Build Improved PM
RKA Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 477 865 0 0 749 262 1 0 0 435 0 266
Future Volume (veh/h) 477 865 0 0 749 262 1 0 0 435 0 266
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847
Adj Flow Rate, veh/h 518 940 0 0 814 285 1 0 0 473 0 289
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 551 2274 0 0 1098 887 4 0 0 465 0 413
Arrive On Green 0.22 0.59 0.00 0.00 0.33 0.33 0.00 0.00 0.00 0.26 0.00 0.26
Sat Flow, veh/h 1931 3953 0 0 3463 1505 1856 0 0 1759 0 1565
Grp Volume(v), veh/h 518 940 0 0 814 285 1 0 0 473 0 289
Grp Sat Flow(s),veh/h/ln 1931 1926 0 0 1687 1505 1856 0 0 1759 0 1565
Q Serve(g_s), s 23.9 15.9 0.0 0.0 25.7 11.5 0.1 0.0 0.0 31.7 0.0 20.0
Cycle Q Clear(g_c), s 23.9 15.9 0.0 0.0 25.7 11.5 0.1 0.0 0.0 31.7 0.0 20.0
Prop In Lane 1.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 551 2274 0 0 1098 887 4 0 0 465 0 413
V/C Ratio(X) 0.94 0.41 0.00 0.00 0.74 0.32 0.25 0.00 0.00 1.02 0.00 0.70
Avail Cap(c_a), veh/h 587 2274 0 0 1098 887 135 0 0 465 0 413
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 29.7 13.3 0.0 0.0 36.0 12.5 59.8 0.0 0.0 44.2 0.0 39.8
Incr Delay (d2), s/veh 22.7 0.6 0.0 0.0 4.5 1.0 28.9 0.0 0.0 46.4 0.0 5.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 17.8 6.5 0.0 0.0 10.8 6.9 0.1 0.0 0.0 19.3 0.0 8.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 52.3 13.9 0.0 0.0 40.5 13.4 88.7 0.0 0.0 90.5 0.0 45.0
LnGrp LOS D B A A D B F A A F A D
Approach Vol, veh/h 1458 1099 1 762
Approach Delay, s/veh 27.5 33.5 88.7 73.3
Approach LOS C C F E
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 77.4 37.0 31.8 45.6 5.6
Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3
Max Green Setting (Gmax), s * 62 * 32 28.9 * 28 8.7
Max Q Clear Time (g_c+I1), s 17.9 33.7 25.9 27.7 2.1
Green Ext Time (p_c), s 21.0 0.0 0.8 0.5 0.0
Intersection Summary
HCM 6th Ctrl Delay 40.0
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
Page 190 of 205
Page 191 of 205
Page 192 of 205
Page 193 of 205
Page 194 of 205
Page 195 of 205
Page 196 of 205
Page 197 of 205
Page 198 of 205
Page 199 of 205
Page 200 of 205
Page 201 of 205
Page 202 of 205
Page 203 of 205
NEW ROAD NAMES: FEBRUARY 2026 GROUP SUBMITTAL
The following road names have been submitted via Preliminary Plat and Civil Construction
plans. All will be privately maintained.
Road Name Development
Redwood Dr Asbury
Narrowleaf Dr Asbury
Field Daisy Ln Asbury
Silver Canoe Way Asbury
Twinleaf Cir Asbury
Alderwood Dr Asbury
Blue Violet Ct Asbury
Page 204 of 205
Agenda Item Summary
Ordinance # / Resolution # :
Contact Person / Sponsor:
Department:
Date Requested to Be on Agenda: 2/5/2026
Council Action Requested:
Strategic Plan Focus Alignment:
Points to Consider:
Funding and Liability Factors:
Recommendation:
Attachments:
None
Page 205 of 205