RecordWell Data

Planning Commission Workshop — Agenda Packet

Lancaster County · Lancaster County · Planning Commission · meeting of Feb 5, 2026 · Agenda packets

Open the original document More from Lancaster County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Planning Commission Members District 1: Jason Cavalier District 2: Yokima Cureton District 3: Lynette Hinson District 4: Judianna Tinklenberg District 5: Shelly Richards, Chair District 6: Sheila Hinson District 7: Frances Liu County Attorney Ginny L. Merck-Dupont Secretary to Planning Commission Mara Mata Planning Director April Williams February 5, 2026 5:00 PM PLANNING COMMISSION County Council Chambers, County Administration Building, 101 North Main Street, Lancaster, SC 29720 WORKSHOP AGENDA 1. Call to Order Regular Meeting 2. New Business a. CU-2025-2644: Nechyporuk/Fort Mill Hwy Application by Volodymyr Nechyporuk and Thomas Frizzi for a Conditional Use Permit for Unit B at 1081 Fort Mill Hwy (p/o TM # 0006-00-068.01) for a proposed Minor Maintenance & Repair (Auto). b. SD-2023-1869: Barberville Commercial Application by Moody Group/Jan Ringeling on behalf of Barberville Developers LLC and Martin Senior and Associates LLC for a Preliminary Plat for six parcels totaling 10.92 acres located at the northwest corner of Barberville Road and Fort Mill Highway (TM #s 0006-00-057.00, 0006-00-058.00, 0006-00-058.01, 0006-00-058.02, 0006-00- 058.03), in order to create a multi-parcel commercial development with central shared access. c. NRN-2026-0011: New Road Names- February Group February Group Submittal, new road names from E911 Addressing via Preliminary Plats and Civil Plans, pursuant to Sec. 6.4.11 of the Unified Development Ordinance. 3. Other a. Discussion: Proposals for CIP Projects 4. Adjournment Recommendations made at this meeting are tentatively scheduled for consideration by County Council in the following month. County Council agendas are posted online at https://lancastercosc.portal.civicclerk.com/. Anyone requiring special services to attend this meeting should contact 285-1565 at least 24 hours in advance of this meeting. Lancaster County Council agendas are posted at the Lancaster County Administration Building and are available on the Page 1 of 205 Website: https://www.lancastercountysc.gov/ Meetings are livestreamed and can be found by using the following link: https://www.youtube.com/@LancasterCoSCGov/streams Page 2 of 205 Agenda Item Summary Ordinance # / Resolution # : Contact Person / Sponsor: Department: Date Requested to Be on Agenda: 2/5/2026 Council Action Requested: Refer to Council for one hearing Strategic Plan Focus Alignment: Points to Consider: Funding and Liability Factors: Recommendation: Attachments: 1. GIS Location Map 2. CU Application 3. ConditionalUsePlan_639045883789854059 4. ConditionalUsePlanpage3_639045883789854059 5. Deed 1824_336 Page 3 of 205 Lancaster County, SC Parcel ID 0006-00-068.01   Class Code Non Qualied Commercial   Taxing District County INDIAN LAND   Land Size 1.91 ACRES Owner FORT MILL HIGHWAY LLC PO BOX 481905 CHARLOTTE, NC 28269 Physical Address 1081 FORT MILL HWY Assessed Value Last 2 Sales Date Price Reason Qual 8/22/2024 $1000000 TRUE SALE Q 6/5/2008 0 WILL Q (Note: Not to be used on legal documents) Date created: 1/29/2026 Last Data Uploaded: 1/29/2026 6:02:42 AM 168 ft Overview Legend Parcels Roads Zoning Districts AR CITY GB HDR HI HSPRGS IMX INS KER LDR LI M MDR MH MX NB OSP PB PDD RB RMX RN RR RUB UR Page 4 of 205 Developed by Page 5 of 205 I Lancaster Plannln1 Department ? South Carolina County P.O. Box 1809, 101 N. Main Street, Lancaster, SC 29721 !11'!!!!!!!!!!!!!!111!!!!:~ Phone: 803.285.6005, plannlng@lancastercountysc.gov - www.mylancastersc.org CONDITIONAL USE APPLICATION SUBMITTAL REQUIREMENTS • Completed Application • Signatures of Applicant and Property Owner • All items noted on the Conditional Use Plan Checklist • Fees associated with review GENERAL INFORMATION Property Address 1081 Fort Mill Highway Unit B City Fort Mill State SC Zip 29707 Tax Parcel ID 000600068.01 Current Zoning G-eo ere...\ bu.!.t,r~~~ent Use o?Cia: I k.0:> ~ "-I: Total Acres A, ) Surrounding Property Description Wowlc.J C<ea Proposed Conditional Use auto repair services CONTACT INFORMATION Applicant Name Volodymyr Nechyporuk Address 11711 Hawick Valley Ln City Charlotte state NC Zip 28277 Phone 704-654-0735 Email willtanllc@gmail.com Prope~Own~r Name Thomas Frizzi Address j 0'6::£> GI C,,,(h s-t: City })~ StateN r. Zip 2-¥03.b Phone 980-721-1839 Email toptf21@gmail.com January 2025 1 Page 6 of 205 APPLICATION CERTIFICATIONS I hereby certify that I have read this appllcatlon and the Information supplied herein is true and correct to the best of my knowledge. I agree to comply With all appllcable County ordinances and state laws related to the use and development of the land. I further certify that I am the property owner, or his/her authorized agent, or the subject property. I understand that falsifying any Information herein may result in reje~hls request. -f J.../ 'I/ et. > Applicant Date Property Owner(s) Date Additional Owner (s) Attach owner's notarized written authorization with property information if the applicant is not the owner. SCHEDULE/PROCESS 1. Submit Application • The deadline for this application is at least 45 days prior to the Planning Commission meeting, held every third Tuesday of the month. • Once an application is submitted, it is placed on the Planning Commission agenda for the following month. • An application withdrawal should be made in writing and received prior to public notice in order to receive a refund. • Conditional Use Application Fee -$500.00 2. Planning Commission • Conducts a public hearing on the application to receive input from Lancaster County citizens, applicant, and other interested parties. • Reviews the application to ensure it is consistent with the Lancaster County Unified Development Ordinance, Comprehensive Plan, and all adopted County plans. • Makes a recommendation to the County Council. 3. County Council • Approves, denies, or submits application to the Planning Commission for further study. • Action requires a resolution for approval. • Subsequent to County Council action, notice of action will be provided to the applicant, January 2025 3 Page 7 of 205 SITE OF REPAIRS EXISTING LANDSCAPE ISLANDS. NO CHANGES REQUIRED EXISTING HARD SURFACE UNMARKED PARKING SPACES TO RECEIVE NEW WHEEL STOPS EXISTING HARD SURFACE DRIVE NO CHANGES REQUIRED This drawing and prints are the property of Reddric k Architecture. The reproduction, copying or other use of this draw ing without written consent from Reddrick Architecture is not permitted, except as permitted by the copyright or architectural work s by the US Copy Right Act. Copyright Architectural Seals Project Name Drawing Credits draftsman checker architect Revisions Sheet Title Editable electronic files are available for an addi tional costs. Please contact the architect for those files. Editable ele ctronic files are available for reference only and discrepancy betwee n sealed drawings and editable electronic files shall be reported to the owner and architect for resolution. Digital Plans James Reddrick Architect www.jr-architect.online 980.254.5348 james@jr-architect.online 1333 Rising Oak Dr, Charlotte, NC, 28206 LLC 5/14/25 5/14/2025 10:12:51 PM A0.1 Author Warehouse Repairs 2025-1081 Cover Sheet Author Author James Reddrick Architect www.jr-architect.online james@jr-architect.online 980.254.5348 LLC ARCHITECTURE Sheet List Sheet Number Sheet Name Current Revision Designer A0.1 Cover Sheet 2 A1.0 Code Summary 2 A1.1 Site Plan and Life Safety Plan 2 Grand total: 3 WAREHOUSE REPAIRS N 12" = 1'-0" A0.1 1 Vicnity Map N 12" = 1'-0" A0.1 3 Existing Landscaping Island 1 RENDERING IS FOR ILLUSTRATION OF THE EXISTING CONDITIONS ON THE SITE. ALL CONDITIONS ARE EXISTING. EXCEPT AS NOTED IN RED. THE GREEN AREAS ARE EXISTING LANDSCAPING. NO CHANGES ARE REQUIRED. THE WHITE IS EXISTING HARD SURFACE. NO CHANGES ARE REQUIRED. SEE OTHER SHEETS FOR FURTHER DETAILS 1 2 No. Description Date 0 Issue for Construction 3/25/25 1 Permit Revisions 4/19/25 2 Permit Revisions 5/14/25 Page 8 of 205 4'-0" MIN TO B.O. BRAILLE 60" MAX TO B.O. HIGHEST TACTILE CHARACTER 9" 4'-0" MIN TO B.O. BRAILLE 60" MAX TO B.O. HIGHEST TACTILE CHARACTER EXIT ACCESSIBILITY TACTILE EXIT SIGN RESTROOM SIGN ALL BUILDINGS ENTRANCES THAT ARE ACCESSIBLE TO AND USABLE BY PHYSICALLY HANDICAPPED PERSONS SHALL BE IDENTIFIED WITH AT LEAST ONE STANDARD SIGN AND WITH ADDITIONAL DIRECTIONAL SIGNS, AS REQUIRED, TO BE VISIBLE TO PERSONS ALONG APPROACHING PEDESTRIAN WAYS. ALL SIGNAGE SHALL CONFORM WITH ADA ACCESSIBILITY GUIDELINES: 1. LETTERS & NUMERALS MUST BE RAISED 1__ 32 " FROM SIGN SURFACE. 2. CHARACTER HEIGHT MUST BE AT LEAST 5/8" BUT NOT EXCEED 2". 3. TYPE STYLE FOR LETTERS AND NUMBERS SHALL BE SANS SERIF OR SIMPLE SERIF. 4. WORDS AND NUMBERS MUST BE CONVERTED INTO GRADE 2 BRAILLE, AND BE APPLIED TO SIGN. 5. PICTOGRAMS SHALL BE ACCOMPANIED BY THE EQUIVALENT VERBAL DESCRIPTION PLACED DIRECTLY BELOW PICTOGRAM. 6. SEE SHEET G-004 FOR MORE DETAILED SIGNAGE INFORMATION. LEVER HANDLE CRYSTAL ICE, FROSTED ACRYLIC ADA SIGN, 9"x9" MOUNTED ON 1/16" BRUSHED ALUM-LOOK ACRYLIC, 1/32" RAISED BLACK LETTERING CLEAR BRAILLE STAINLESS STEEL STANDOFFS G.C. TO INSTALL AS REQ'D BY GOV. CODES/ COORDINATE WITH TENANT FOR ANY ADDITIONAL SIGNS FROM EDGE OF DOOR FRAME TO CL OF SIGN 1 1_ 4 " TO 1 1/2" 11/2" ANCHOR PLATES ARE 12 GAUGE STEEL AND 6" WIDE. (LENGTH VARIES). FURNISHED WITH STAINLESS STEEL MACHINE SCREWS TO ACCOMMODATE WALL FINISHES TO 1 1/2" THICK. ANCHOR PLATES SECURED TO STUDS BY WELDING, WIRING OR SELF THREADING SCREWS. GRAB BARS LOCATE GRAB BARS ON EACH SIDE, OR ONE SIDE AND THE BACK, OF THE WATER CLOSET, 33 INCHES ABOVE AND PARALLEL TO THE FLOOR. GRAB BARS AT THE SIDE ARE TO BE AT LEAST 42 INCHES LONG WITH THE FRONT END POSITIONED 12 INCHES IN FRONT OF THE WATER CLOSET. GRAB BARS AT THE BACK CAN NOT BE LESS THAN 36 INCHES LONG. THE DIAMETER OR WIDTH OF THE GRIPPING SURFACE IS REQUIRED TO BE 1 1/4 TO 1 1/2 INCHES, OR THE SHAPE IS TO PROVIDE AN EQUIVALENT GRIPPING SURFACE. IF GRAB BARS ARE MOUNTED ADJACENT TO A WALL, THE SPACE BETWEEN THE WALL AND THE GRAB BARS IS TO BE 1 1/2 INCHES. GRAB BARS SHALL NOT ROTATE WITHIN THEIR FITTINGS. GRAB BARS AND ANY SURFACE ADJACENT TO THEM CAN NOT HAVE ANY SHARP OR ABRASIVE ELEMENTS. EDGES ARE TO HAVE A MINIMUM RADIUS OF 1/8 INCH. BENDING STRESS IN A GRAB BAR OR SEAT INDUCED BY THE MAX. BENDING MOMENT FROM THE APPLICATION OF A 250 LB. POINT LOAD SHALL BE LESS THAN THE ALLOWABLE STRESS FOR THE MATERIAL OF THE GRAB BAR OR SEAT. SHEAR STRESS INDUCED IN A GRAB BAR BY THE APPLICATION OF 250 LBF POINT LOAD SHALL BE LESS THAN THE ALLOWABLE SHEAR STRESS FOR THE MOUNTING BRACKET OR OTHER SUPPORT IS CONSIDERED TO BE FULLY RESTRAINED, THEN DIRECT AND TORSIONAL SHEAR STRESSES SHALL NOT EXCEED THE ALLOWABLE SEAR STRESS. SHEAR FORCE INDUCED IN FASTENER OR MOUNTING DEVICES FROM THE APPLICATION OF A 250 LB. POINT LOAD SHALL BE LESS THAN THE ALLOWABLE LATERAL LOAD OF EITHER FASTENER OR MOUNTING DEVICE OR THE SUPPORTING STRUCTURE, WHICHEVER HAS THE SMALLER ALLOWABLE LOAD. TENSILE FORCE INDUCED IN A FASTENER BY A DIRECT TENSION FORCE OF A 250 LB. POINT LOAD, PLUS THE MAX. MOMENT FROM THE APPLICATION OF A 250 LB. POINT LOAD, SHALL BE LESS THAN THE ALLOWABLE WITHDRAWAL LOAD BETWEEN THE FASTENER AND SUPPORTING STRUCTURE. GRAB BAR AND ANY WALL OR OTHER SURFACE ADJACENT TO IT SHALL BE FREE OF ANY SHARP OR ABRASIVE ELEMENTS. EDGES SHALL HAVE A MINIMUM RADIUS OF 1/8". CORRESPONDING GRADE II BRAILLE EXISTING BRACKET MOUNTED FIRE EXTINGUISHER TO BE 2A:10BC EXTINGUISHER WITH 5LB CAPACITY. INSTALLED AT EACH EXIT DOOR. 4' - 0" GRAB BARS SOAP DISPENSER 1' - 6" 3' - 0" 3' - 0" 0' - 6 1/2" 2' - 10" 3' - 4" 3' - 0" 3' - 6" 3' - 7" MIRROR TOILET TISSUE DISPENSER GRAB BARS 1' - 5 1/4" 4' - 0" 0' - 6" 3' - 5" 3' - 6 1/4" 1' - 6" 1' - 6" 3' - 6" TOP OF GRAB BAR 3' - 0" PROVIDE GRAB BARS FOR WATER CLOSETS THAT WERE REPLACED REPLACEMENT OF SINK DONE IN A MANNER THAT MAINTAINED THE LEVEL OF ACCESSIBLITY PER SOUTH CAROLINA EXISTING BUILDING CODE SECTION 401.2; THUS SINK DOES NOT HAVE TO COMPLY WITH CURRENT ACCESSIBILITY REQUIREMENTS SOAP DISPENSER PAPER TOWEL DISPENSER WASTE RECEPTACLE 18" VERTICAL GRAB BAR 42" GRAB BAR 36" GRAB BAR TOILET TISSUE DISPENSER ACCESSIBLE RESTROOM SIGN MIRROR PT DISPENSOR (PTD) AND WASTE RECEPTACLE (WR) 4' - 0" This drawing and prints are the property of Reddric k Architecture. The reproduction, copying or other use of this draw ing without written consent from Reddrick Architecture is not permitted, except as permitted by the copyright or architectural work s by the US Copy Right Act. Copyright Architectural Seals Project Name Drawing Credits draftsman checker architect Revisions Sheet Title Editable electronic files are available for an addi tional costs. Please contact the architect for those files. Editable ele ctronic files are available for reference only and discrepancy betwee n sealed drawings and editable electronic files shall be reported to the owner and architect for resolution. Digital Plans James Reddrick Architect www.jr-architect.online 980.254.5348 james@jr-architect.online 1333 Rising Oak Dr, Charlotte, NC, 28206 LLC 5/14/25 5/14/2025 10:12:51 PM A1.0 Author Warehouse Repairs 2025-1081 Code Summary Author Author . _________ _________ _________ psf _________ psf _________ psf _________ _________ mph (ASCE-7) DESIGN LOADS: Importance Factors: Ground Snow Load: Live Loads: Wind Load: Exposure Category: Ultimate Wind Speed: _________ psf Snow Seismic Mezzanine Roof Floor ALLOWABLE Building Height in Stories (T504.4) Building Height in Feet (T504.3) TELEPHONE # NAME LICENSE # 2021 SOUTH CAROLINA BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS S1Ss _________ %g Dual w/Special Moment Frame Inverted Pendulum _________ %g Dual w/Intermediate R/C or Special Steel Site Classification: (ASCE 7) Risk Category: (Table 1604.5) Analysis Procedure: Basic structural system (check one) LATERAL DESIGN CONTROL: SOIL BEARING CAPACITIES: Spectral Response Acceleration: Moment Frame Building Frame Bearing Wall Architectural, Mechanical, Components anchored? Simplified Equivalent Lateral Force Dynami c TOTAL # # OF ACCESSIBLE SPACES PROVIDED ACCESSIBLE PROVIDED VAN SPACES WITH REGULAR WITH 5' ACCESS AISLE PROVIDED LOT OR PARKING AREA ZONED GB TOTAL # OF PARKING SPACES REQUIRED DETAIL # AND SHEET # REQ'D FIRE SEPARATION DISTANCE (FEET) RATING** Structural frame, including columns, girders, and trusses BUILDING ELEMENT Exterior East North Bearing walls Interior Nonbearing walls and partitions (see section 601-602 if rated) South West Smoke Partition Party/ Fire Wall Separation Corridor Separation Shaft enclosures - Other Shaft enclosures - Exit Tenant/ Dwelling Unit/ Sleeping Unit Separation Smoke Barrier Separation Floor construction Including supporting beams and joists A-5A-4A-3A-2A-1 Factory FIRM DESIGNER Architectural Electrical Civil Fire Alarm Mechanical Plumbing Structural Retaining Walls >5' High Sprinkler-Standpipe Primary Occupancy Classification(s): Business Assembly Educational CONTACT: The required type of construction for the building shall be determined by applying the height and area limitations for each of the applicable occupancies to the entire building. The most restr ictive type of construction, so determined, shall a pply to the entire building. Separated use (508.4) See below for area calculations for each story, the area of the occupancy shall be such that the sum o f the ratios of the actual floor area of each use divided by the allowable floor area for ea ch use shall not exceed 1. Non-Separated Use (508.3.) Actual Area of Occupancy A Allowable Area of Occupancy A ________________________ a. Perimeter which fronts a public way or open space having 20 feet minimum width = _______ (F) b. Total Building Parameter = ______________ (P) c. Ratio (F/P) = __________ (F/P) d. W = Minimum width of public way = ________________ (W) e. Percent of frontage increase I = 100[F/P - 0.25] X w/30 = ________ (%) Unlimited area applicable under conditions of Sections 507. Frontage area increases from Section 506.3 are computed thus: 2 1 STORY NO DESCRIPTION AND USE Mixed Occupancy No f Actual Area of Occupancy B Allowable Area of Occupancy B _____________________ (A) BLDG AREA PER STORY (ACTUAL) + + + < 1 < 1.00 ______ Exception: _______ Separation: _____ Hr. Yes 0.97 = Maximum Building Area=total number of stories in the building x D (506.2). Maximum of 3. 3 The Maximum area of open parking garage shall be permitted to comply with 406.5.4. 4 Incidental use Separation DCB Historical Data Presumptive Field Test ASEISMIC DESIGN CATEGORY: PARKING: 2021 SC BUILDING CODE Shell/Core- Contact the local inspection jurisdiction for possible additional procedures and requirements First time interior completion (upfit) New Building Addition Constructed: (date) III-B III-A Wet III NFPA 13D II-A II I Class: Yes Yes NFPA 13 II-B NFPA 13R Yes Dry I-AConstruction Type: (Check all that Apply) No No Sprinklers: I-B No Fire District: Standpipes: IV V-B V-A PARTIAL Emergency Lighting: Carbon Monoxide Detection: Smoke Detection Systems: Exit Signs: Fire Alarm: Yes Yes Yes Yes Yes No No No No No Partial 0 0 0 0 0 0 0 0 0 0 0 0 (980) 254-5348 James Reddrick James Reddrick Architect LLC 10'< X >30' NA N/A N/A N/A N/A N/A - - - - - - - - - - - psf (Net) - psf N/A N/A N/A 8135 (B) TABLE 506.2 AREA 4 (C) AREA FOR FRONTAGE INCREASE 1,5 (D) ALLOWABLE AREA PER STORY OR UNLIMITED 2,3 SHOWN ON PLANS CODE REFERENCE PROVIDED W/ ___________* REDUCTION DESIGN # FOR RATED ASSEMBLY DESIGN # FOR RATED PENETRATION DESIGN # FOR RATED JOINTS Roof construction Including supporting beams and joists *Indicate section number permitting reduction. Field Test (provide copy of test report as a refere nced document): Presumptive Bearing capacity Pile size, type, and capacity N/A N/A N/A N/A N/A N/A N/A N/A IV III II I Data Source: DCBA E F No Yes Wind Earthquake (Reproduce the following data on the building plans sheet 1 or 2) E-MAIL James@jr-architect.online Yes No Flood Hazard Area: ALLOWABLE AREA I-4 54 I-3 2 3 I-2 1 I-1Institutional I-3 Condition B E F-1 Moderate F-2 Low H-1 Detonate H-2 Deflagrate Hazardous H-3 Combust H-4 Health H-5 HPM MMercantile R-4R-3R-2R-1Residential S-2 Low S-1 Moderate Storage High-piled Enclosed Parking Garage Repair Garage Open UUtility and Miscellaneaous Accessory Occupancy Classifications FIRE PROTECTION REQUIREMENTS N/A PERCENTAGE OF WALL OPENING CALCULATIONS DEGREE OF OPENINGS PROTECTION (TABLE 705.8) ALLOWABLE AREA (%) ACTUAL SHOWN ON PLANS (%) FIRE SEPARATION DISTANCE (FEET) FROM PROPERTY LINES LIFE SAFETY SYSTEM REQUIREMENTS LIFE SAFETY PLAN REQUIREMENTS Fire and/ or smoke rated wall locations (Chapter 7) Assumed and real property line locations (if not on the site plan) Exterior wall opening area with respect to distance to assumed property lines (705.8) Occupancy Use for each area as it relates to occupa nt load calculation (Table 1004.1.2) Occupant loads for each area Exit access travel distances (1017) Common path of travel distances (Tables 1006.2.1 & 1006.3.2(1)) Dead end lengths (1020.4) Clear exit widths for each exit door Maximum calculated occupant load capacity each exit door can accommodate based on egress width (1005.3) Actual occupant load for each exit door A separate schematic plan indication where fire rated floor/ceiling and/or roof structure is provided for purposes of occupancy separation Location of doors with panic hardware (1010.1.10) Location of doors with delayed egress locks and the amount of delay (1010.1.9.7) Location of doors with electromagnetic egress locks (1010.1.9.9) Location of doors equipped with hold-open devices Location of emergency escape windows (1030) The square footage of each fire area (202) The square footage of each smoke compartment (407.5 ) Note any code exceptions or table notes that may have ben utilized regarding the items above ACCESSIBLE DWELLING UNITS (SECTION 1107) NOT APPLICABLE TOTAL UNITS ACCESSIBLE UNITS REQUIRED ACCESSIBLE UNITS PROVIDED TYPE A UNITS REQUIRED TYPE A UNITS PROVIDED TYPE B UNITS REQUIRED TYPE B UNITS PROVIDED TOTAL ACCESSIBLE UNITS PROVIDED ACCESSIBLE PARKING (SECTION 1106) 132" ACCESS AISLE 8' ACCESS AISLE Walls X>30 Other Renovation Phased Construction - Shell/Core- Contact the local inspection jurisdiction for possible additoinal procedures and requirements 2021 SC EXISTING BUILDING CODE Prescriptive Repair Chapter 14 Level I Level II Level III Historic Property Change of Use RISK CATEGORY (T1604.5) Current: I II Proposed: III IV I II III IV Special Inspections: Yes (Contact the local inspection jurisdiction fo r additional procedures and requirements) No BASIC BUILDING DATA GROSS BUILDING AREA TABLE BUSINESS (LESS THAN 10% OF FLOOR AREA) Incidental Uses (T509) N/A Special Uses (Ch 4- List Code) N/A Special Provisions (Ch 5 - List Code) N/A Frontage increase is basedon the unsprinklered area value in T506.2 5 ALLOWABLE HEIGHT 2 3 Provide code reference if the "Shown on Plans" quantity is not based on T504.3 or 504.4. 1 The maximum height of air traffic control towers must comply with T412.3.1. 2 The maximum height of open parking garages must comply with T406.5.4. 3 Floor Ceiling/Roof Ceiling Assembly Columns Supporting Floors/ Roof Occupancy/ Fire Barrier Separation ACCESSIBLE REGULAR DRINKING FOUNTAINS LAVATORIES URINALS OCCUPANCY USE GROUP AND/OR SPACE DESIGNATION WATERCLOSETS M Existing PLUMBING FIXTURE REQUIREMENTS (T2902.1) SHOWER/ TUBS Special Approvals (Local Jurisdiction, Department of Insurance. OSC, DPI, DHHS, ICC, etc.,describe below) SPECIAL APPROVALS (If applicable to project) - - - - - - - - - - - - - - - - - - - - - - - - - - ENERGY REQUIREMENTS: The following data shall be considered minimum and a ny special attribute required to meet the energy code shall also be provided. Each Designer shall furnish the required portions of the project information for the plan data sheet. If performance method, state the annual energy cost for the standard reference design vs annual energy cost for the proposed design. THERMAL ENVELOPE: (Prescriptive method only) Roof/ceiling Assembly(each assembly) Description of assembly U-Value of total assembly R-Value of insulation Skylights in each assembly U-Value of skylight Total percentage of skylights in each assembly: Exterior Walls (each assembly) Description of assembly U-Value of total assembly R-Value of insulation Openings (windows or doors with glazing) U-Value of assembly Solar heat gain coefficient: Projection factor Low E required, if applicable Door U-Values Walls below grade (each assembly) Description of assembly U-Value of total assembly R-Value of insulation Floors over unconditioned space (each assembly) Description of assembly U-Value of total assembly R-Value of insulation Floors slab on grade Description of assembly U-Value of total assembly R-Value of insulation Horizontal/vertical requirement Slab heated Climate Zone: Existing building envelope complies with code: Yes (The remainder of this section is not applicab le) No Exempt Building: Yes (Provide code or stautory reference) See Note 1 Below. No 4A 3A 5A Method of Compliance: Energy Code ASHRAE 90.1 (2013) Other Performance Prescriptive Performance Prescriptive - - (I ) S (I ) E 2,000 N/A Exterior East North Interior South West (EXCEPT 1 AND 2 FAMILY DWELLINGS AND TOWNHOUSES) N/A N/A N/A Owner or Authorized Agent: Code Enforcement Jurisdiction: Owned By: Name of Project: Address: County City City/County Private State State Warehouse Repairs 1081 Fort Mill Highway, Fort Mill, SC 29707 (980) 254-5348 Buildings descriptions and scope of work: JAMES REDDRICK Lancaster james@jr-architect.online PROJECT INFORMATION: Phone # E-Mail N/A N/A N/A N/A N/A N/A N/A Repaired: (date) Current Occuapncy(s) Ch. 3 Proposed Occuapncy(s) Ch. 3 DATA 1978 2024 S-2, S-1, F-2 EXISTING (SQ. FT.) FLOOR - - - 22,102 NEW (SQ. FT.) Warehouse - - - 0 0 0 0 Warehouse 14,696 (S-2) low hazard 26,000 N/A 26,000 55'-0" 3 12'-6" 1 (EXISTING) T504.3 T504.4 STRUCTURAL DESIGN (EXISTING-NO CHANGES REQUIRED ) N/A SC The existing warehouse repair work was performed prior to issue of permit. The AHJ stopped work and requested the owner hire an architect. The owner hired JR-Architect. JR-Architect evaluated the facility and determined the repair work included replacing broken toilet fixtures, replacing paint, replacing broken doors, and replacing floor finishes. The repair work included Suites A, B, C, D, and E. The facility was evaluated for code compliance and the architectural drawings show compliance for permitting purposes and documentation. Suite D already has permit from 2010 and thus no work required in Suite D. N/A N/A N/A N/A N/A N/A PER ZONING 18 1 3 - 1 10 MECHANICAL SYSTEMS, SERVICE SYSTEMS AND EQUIPMENT Winter dry bulb -°F Thermal Zone -- Summer dry/wet bulb -°F DB / -°F WB Winter dry bulb -°F Interior Design Conditions Summer dry bulb -°F Relative Humidity -% Outside Air Heating Load - MBH Outside Air Cooling Load - MBH Mechanical Space Conditioning System Description of Unit - Heating Efficiency - Cooling Efficiency - Unitary Heat output of Unit - Cooling output of Unit - Size category.. If oversized state reason. N/A Boiler Size category. If oversized state reason. N/A Chiller List Equipment Efficiencies . Performance Prescriptive Method of Compliance: ELECTRICAL SYSTEM AND EQUIPMENT Lighting Schedule (each fixture type) Number of Lamps in fixture - Ballast type used in the fixture - Number of Ballasts in fixture - Total wattage per fixture - Total interior wattage specified vs allowed Lamp type required in fixture - Energy Code: Performance Prescriptive ASHRAE 90.1: Additional Required Prescreptive Compliance C406.2 More Efficient HVAC Equipment Performance C406.3 Reduced Lighting Power Density C406.4 Enhanced Digital Lighting Controls C406.5 On-Site Renewable Energy C406.6 Dedicated Outdoor Air System C406.7 Reduced Energy Use in Service Water Heating N/A REPAIR (SQ. FT.) Replace doors, floors, paint, toilets 0 0 0 0 0 UP, Sprinklered No limit 2 - F Unisex New Required - 7 1 - 10- 5 0 M F Unisex - - 7 - - 5 (EXISTING-NO CHANGES REQUIRED) Note 1: 2018 NC Existing building code section 811. 1 does not require existing building envelopes to comply with the ener gy code (EXISTING-NO CHANGES REQUIRED) (EXISTING-NO CHANGES REQUIRED) (EXISTING-NO CHANGES REQUIRED) 1. NO CHANGES ARE REQUIRED TO EXISTING PLUMBING FIXTURE COUNT. 2. EACH TENANT SPACE HAS LESS THAN 15 PEOPLE THUS DR INKING FOUNTAINS ARE NOT REQUIRED PER SC PLUMBING CODE SECTION 410.2. HOWEVER SUITE D HAS MORE THAN 15 PEOPLE BUT SUITE HAS AN EXISTING REFRIGERATOR AND EXISTING BREAK ROOM SINK FOR OCCUPANTS TO DRINK WATER N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 10'< X >30' 10'< X >30' 0 0 0 N/A 0 0 N/A N/A N/A 0 N/A 48 Assembly (EXISTING-NO CHANGES REQUIRED) (EXISTING-NO CHANGES REQUIRED) (EXISTING- NO CHANGES REQUIRED) 1 10'< X >30' N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A S-2, S-1, F-2 2* _____________________ +14,696 (S-2) 26,000 (S-2) 2,512 (S-1) 17,500 (S-1) 4,898 (F-2) 18,000 (F-2) Warehouse (SUITE A) 2,512 (S-1) mod hazard 17,500 N/A 17,500 * S-1 adjacent to S-2 is 2hr rating. However F-2 adjacent to S-2 does not require a fire rating. Warehouse 4,898 (F-2) low hazard 18,000 N/A 18,000 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1/4" = 1'-0" A1.0 1 Accessibility Restroom and Exit Sign 6" = 1'-0" A1.0 2 Tactile Exit Sign 3/8" = 1'-0" A1.0 3 Fire Extinguisher Cabinet 3/8" = 1'-0" A1.0 4 Water Closet Front Elevation 3/8" = 1'-0" A1.0 5 Water Closet Side Elevation 3/8" = 1'-0" A1.0 A1.1 6 Typical Accessible Restroom 3/8" = 1'-0" A1.0 7 Paper Towel Dispenser 3" = 1'-0" A1.0 8 Grab Bar Details 12" = 1'-0" A1.0 9 Accessible Parking Standard 1 1 1 2 2 No. Description Date 0 Issue for Construction 3/25/25 1 Permit Revisions 4/19/25 2 Permit Revisions 5/14/25 Page 9 of 205 MIDLAND CART COMPANY A100 OFFICE A101 BATH A102 VACANT STORAGE B100 OFFICE B101 BATH B102 VACANT STORAGE C100 OFFICE C101 BATH C102 OFFICE D102 OFFICE D103 BREAK D104 BATH D105 BATH D106 BATH D107 TOP TURF E100 OFFICE E101 BATH E102 JAN E103 SHOWER E104 SECURE STORAGE E105 Room Legend BATH BREAK Closet JAN MIDLAND CART COMPANY OFFICE SECURE STORAGE SHOWER SOUND DESIGN SOUND DESIGN STORAGE TOP TURF VACANT STORAGE FORT MILL HIGHWAY 49' - 9 1/2" RECENTLY NEW TENANT 50' - 7" 97' - 0" EXISTING TENANT SINCE 2010 96' - 6 1/2" EXISTING TENANT SINCE 2010 83' - 0" RECENTLY NEW TENANT 60' - 3" Closet E106 OFFICE D101 SOUND DESIGN STORAGE D100A SOUND DESIGN D100B S-2 OCCUPANCY 98' - 0" EXISTING WALL TO BE COVERED WITH NEW 2HR FIRE BARRIER SHAFT WALL PER UL U417. CONTINUITY AT HEAD AND JAMB OF WALL SHALL BE EQUAL TO UL DESIGN CJ -D-004 PROVIDE 36" REAR GRAB BAR PROVIDE 42" SIDE GRAB BAR PROVIDE 18" VERTICAL GRAB BAR AT WATER CLOSETS PROVIDE 36" REAR GRAB BAR PROVIDE 42" SIDE GRAB BAR PROVIDE 18" VERTICAL GRAB BAR AT WATER CLOSET SEE ACCESSIBLE NOTE 4&5 RIGID FIBERLGASS SHEETS ARE CLASS 1 COMMODITY. IT IS STORED IN PILES ON 4 ’X4 ’ PALLETS. NON -COMBUSTIBLE STORAGE ITEMS ONLY RIGID FIBERLGASS SHEETS LIGHT MANUFACTURING EXISTING ELECTRIC CART STORAGE. CHARGING STATION IS NOT REQUIRED OR PROVIDED SOUND DESIGN IS EXISTING TENANT SPACE WITH PERMIT. NO CHANGES REQUIRED. SPACE SHOWN FOR DOCUMENTATION ONLY. DOCK EXISTING LANDSCAPING TO REMAIN NO CHANGES REQUIRED SIDE YARD SETBACK 15' - 0" SIDE YARD SETBACK 15' - 0" FRONT YARD SETBACK 50' - 0" REAR YARD SETBACK 15' - 0" EXISTING BUILDING ENCROACHES INTO SETBACK. POSSIBLY BUILT PRIOR TO THE ADOPTION OF THE CURRENT ZONING ORDINANCE; THUS IT IS LEGAL NON - CONFORMING AND GRANDFATHERED TO ALLOW ENCROACHMENT INTO SETBACK. BUILDING BUILT IN 1978. EXISTING FORK LIFT DRIVE APRON FOR COILING DOORS EXISTING BUILDING ENCROACHES INTO SETBACK. POSSIBLY BUILT PRIOR TO THE ADOPTION OF THE CURRENT ZONING ORDINANCE; THUS IT IS LEGAL NON - CONFORMING AND GRANDFATHERED TO ALLOW ENCROACHMENT INTO SETBACK. BUILDING BUILT IN 1978. A1.0 6 FIRE EXTINGUISHER FIRE EXTINGUISHER FIRE EXTINGUISHER FIRE EXTINGUISHER FIRE EXTINGUISHER FIRE EXTINGUISHER EXIT DISTANCE IS 70FT OCCUPANT LOAD AT DOOR IS 5 PEOPLE: THE DOOR CAPACITY IS 360 PEOPLE THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH THE EXISTING DOOR WIDTH IS 72" AREA IS S -1 OCCUPANCY. OCCUPANT LOAD CALCULATION 2512 SQFT / 500 SQFT PERSON = 5 PERSON AREA IS S -2 OCCUPANCY. OCCUPANT LOAD CALCULATION 4949 SQFT / 500 SQFT PERSON = 10 PERSON EXIT DISTANCE IS 90 FT OCCUPANT LOAD AT DOOR IS 5 PEOPLE: THE DOOR CAPACITY IS 170 PEOPLE THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH THE EXISTING DOOR WIDTH IS 36" EXIT DISTANCE IS 90 FT OCCUPANT LOAD AT DOOR IS 5 PEOPLE: THE DOOR CAPACITY IS 170 PEOPLE THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH THE EXISTING DOOR WIDTH IS 36" AREA IS F -2 OCCUPANCY. OCCUPANT LOAD CALCULATION 10 PERSON ACTUAL OCCUPANT LOAD (1004.5 EXCEPTION) 4,906 SQFT EXIT DISTANCE IS 80 FT OCCUPANT LOAD AT EACH DOOR IS 5 PEOPLE: THE DOOR CAPACITY IS 170 PEOPLE THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH THE EXISTING DOOR WIDTH IS 36" AREA IS S -2 OCCUPANCY. OCCUPANT LOAD CALCULATION 4848 SQFT / 500 SQFT PERSON = 10 PERSON EXIT DISTANCE IS 100FT OCCUPANT LOAD AT DOOR IS 5 PEOPLE: THE DOOR CAPACITY IS 170 PEOPLE THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH THE EXISTING DOOR WIDTH IS 36" EXIT DISTANCE IS 45 FT OCCUPANT LOAD AT DOOR IS 5 PEOPLE: THE DOOR CAPACITY IS 170 PEOPLE THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH THE EXISTING DOOR WIDTH IS 36" AREA IS S -2 OCCUPANCY. OCCUPANT LOAD CALCULATION 5000 SQFT / 500 SQFT PERSON = 10 PERSON EXIT DISTANCE IS 67 FT OCCUPANT LOAD AT DOOR IS 5 PEOPLE: THE DOOR CAPACITY IS 170 PEOPLE THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH THE EXISTING DOOR WIDTH IS 36" EXIT DISTANCE IS 60 FT OCCUPANT LOAD AT DOOR IS 5 PEOPLE: THE DOOR CAPACITY IS 170 PEOPLE THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH THE EXISTING DOOR WIDTH IS 36" 7' - 6" OUTDOOR STORAGE OF PROPANE TANKS IN AN APPROVED STORAGE CABINET. SCREENED BY 6FFT TALL WOOD FENCE. EXISTING LANDSCAPING ISLAND 5FT WALK WAY EXISTING COMPACTED HARD SURFACE TO BE TREATED WITH "GRAVEL LOK" . SEE ACCESSIBLE NOTE 1 8' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" EXISTING LANDSCAPING ISLAND 19' - 0" 19' - 0" 23' - 0 1/2" 19' - 0" 1' - 9 1/2" 6' - 6" TYPICAL WHEEL STOP LOCATION. SEE WHEEL STOP NOTE 1&2 SEE ACCESSIBLE NOTE 2&3 EXISTING LANDSCAPING TO REMAIN NO CHANGES REQUIRED EXISTING LANDSCAPING TO REMAIN NO CHANGES REQUIRED EXISTING LANDSCAPING TO REMAIN NO CHANGES REQUIRED EXISTING HARD SURFACE TO REMAIN NO CHANGES REQUIRED EXISTING HARD SURFACE TO REMAIN NO CHANGES REQUIRED 30' - 0" 32' - 0" EXISTING SEPTIC EXISTING SEPTIC EXISTING SEPTIC 12' - 0" 10' - 0" CANOPY 18' - 0" 5' - 0" 5' - 0" 23' - 8 3/4" EXISTING DUMPSTER 6' HEIGHT 6FT OPAQUE WOOD FENCE WITH WOOD GATE DOORS 6FT HIGH WOOD FENCE 20' - 0" 11' - 10 1/2" UNMARKED HARD SURFACE PARKING SPACES TO GET NEW WHEEL STOPS, TYPICAL SEE ACCESSIBLE NOTE 4&5 23' - 2 3/4" UNMARKED HARD SURFACE PARKING SPACES TO GET NEW WHEEL STOPS, TYPICAL EXISTING WELL 5' - 0" 9' - 0" 5' - 0" 5' - 0 1/4" 9' - 0" This drawing and prints are the property of Reddric k Architecture. The reproduction, copying or other use of this draw ing without written consent from Reddrick Architecture is not permitted, except as permitted by the copyright or architectural work s by the US Copy Right Act. Copyright Architectural Seals Project Name Drawing Credits draftsman checker architect Revisions Sheet Title Editable electronic files are available for an addi tional costs. Please contact the architect for those files. Editable ele ctronic files are available for reference only and discrepancy betwee n sealed drawings and editable electronic files shall be reported to the owner and architect for resolution. Digital Plans James Reddrick Architect www.jr-architect.online 980.254.5348 james@jr-architect.online 1333 Rising Oak Dr, Charlotte, NC, 28206 LLC 5/14/25 5/14/2025 10:12:53 PM A1.1 J.Reddrick Warehouse Repairs 2025-1081 Site Plan and Life Safety Plan J.Reddrick J.Reddrick 3/32" = 1'-0" A1.1 2 Site and Life Safety Plan OWNER FORT MILL HIGHWAY LLC PHYSICAL ADDRESS 1081 FORT MILL HWY ACRES 1.91 ACRES PID 0006 -00 -068.01 UNIFIED DEVELOPMENT ORDINANCE ZONING CLASSIFICATION GENERAL BUSINESS (GB) PERMITTED USES LIGHT MANUFACTURING (TABLE 2.5.3) OUTDOOR STORAGE WAREHOUSE INDOOR STORAGE BUSINESS SUPPORT SERVICES PARKING REQUIREMENTS 1 SPACE PER 500 SQFT OF OFFICE SPACE (TABLE 7.2.4) PARKING CALCULATIONS: MIDLAND GOLF CART OFFICE SALE 231 SQFT/250 SQFT = 1 PARKING SPACE MIDLAND STORAGE AREA DOES NOT REQUIRE PARKING VACANT STORAGE -B OFFICE 231 SQFT/500 SQFT = 1 PARKING SPACE VACANT STORAGE -B STORAGE AREA DOES NOT REQUIRE PARKING VACANT STORAGE -C OFFICE 231 SQFT/500 SQFT = 1 PARKING SPACE VACANG STORAGE -C STORAGE AREA DOES NOT REQUIRE PARKING SOUND DESIGN OFFICE 500 SQFT/500SQFT = 1 PARKING SPACE SOUND DESIGN STORAGE AREA DOES NOT REQUIRE PARKING TOP TURF OFFICE 279 SQFT/500 SQFT = 1 PARKING SPACE TOP TURF STORAE AREA DOES NOT REQUIRE PARKING TOTAL PARKING SPACES REQUIRED = 5 PARKING SPACES OR AS INDICATED BY ZONING OFFICIALS TOTAL ACCESSIBLE SPACES REQUIRED = 1 VAN ACCESSIBLE SPACE TOTAL EXISTING PARKING SPACE PROVIDED = 15 EXISTING PARKING SPACES (PROVIDE NEW WHEEL STOPS) TOTAL ACCESSIBLE PARKING SPACES PROVIDED = 1 VAN ACCESSIBLE SPACE + 2 ACCESSIBLE SPACE TOTAL SPACES = 18 PARKING SPACES SETBACKS 50FT FRONT YARD TABLE 2.4 15FT SIDE YARD 15FT REAR YARD N STORAGE NOTES FOR SUITE E 1. RX FERTILIZER ACCUBLEND PELLET FERTILIZER IS A CLASS 1 COMMODITY. IT IS STORED IN 50LB BAGS ON PALLETS 2. PRIME TIME TURF TYPE TALL FESCUE BLEND GRASS SEED IS A CLASS 1 COMMODITY. IT IS STORED IN 50LB BAGS ON PALLETS 3. NUTRITE UREA FRILL AGRICULTURAL GRADE 46 -0-0 PELLET FERTILIZER IS A CLASS 1 COMMODITY. IT IS STORED IN 50LB BAGS ON PALLETS. 4. GATOR EXCEL IRON LIQUID FERTILIZER IS A CLASS 1 COMMODITY. IT IS STORED IN 275 GALLON TOTE ON PALLETS. 5. DIMENSION 2EW HERBICIDE IS A IRRITANT MATERIAL (NOT TOXIC). IT IS STORED IN 30 GALLON DRUM. MAQ NOT TO EXCEED 125 GALLONS INSIDE BUILDING. 6. PROPANE GAS CYLINDERS IS A FLAMMABLE GAS. IT IS STORED IN 8 GALLON CYLINDERS. MAQ NOT TO EXCEED 300 GALLONS. TANKS TO BE STORED OUTSIDE IN AN APPROVED STORAGE CABINET EQUAL TO USA SAFETY PRODUCT " 4 PROPANE TANKS (33 LB) - OUTDOOR - HORIZONTAL STORAGE - STEEL & MESH - GAS CYLINDER CAGE" GENERAL NOTES 1. ALL CONDITIONS ARE EXISTNG UNLESS NOTED OTHERWISE 2. WORK INCLUDES A. PROVIDING ACCESSIBLE PARKING SPACE, B. GRAB BARS AT RESTROOM SUITES A, B, C, AND E C. ADDING A 2HR FIRE BARRIER TO SEPARATE S -2 SPACE FROM S -1 SPACE BETWEEN SUITE A AND SUITE B D. PROVIDE MANUAL FIRE EXTINGUISHERS AT ALL SUITES E. PROVIDING EVALUATION AND DOCUMENTATION OF CURRENT FACILITY PLAN STORAGE F. EXISTING BATH FACILITIES ARE REPLACEMENT OF FIXTURES DONE IN A MANNER THAT MAINTAINED THE LEVEL OF ACCESSIBLITY PER SOUTH CAROLINA EXISTING BUILDING CODE SECTION 401.2; THUS FIXTURES DOES NOT HAVE TO COMPLY WITH CURRENT ACCESSIBILITY REQUIREMENTS. HOWEVER GRAB BARS ARE ADDED. 3. LIFE SAFETY TRAVEL DISTANCE SHALL NOT EXCEED 200FT TO AN EXIT. SEE PLAN FOR ACTUAL TRAVEL DISTANCE. 4. AT EACH EXIT DOOR PROVIDE A TACTILE EXIT SIGN 5. AT EACH SUITE A FIRE EXTINGUISHER TO BE PROVIDED 6. ALL EXISTING EXIT DOORS SHALL ALLOW FREE EGRESS. 7. ALL GRAVEL DRIVEWAYS/PARKING, SIDEWALKS, AND LANDSCAPING ARE EXISTING. NO GRADING IS REQUIRED. 8. NEW ITEMS INCLUDE "GRAVEL LOK" TREATMENT AT EXISTING GRAVEL WALKWAY. SEE PLAN FOR LOCATION. 9. NEW ITEMS INCLUDE NEW WHEEL STOPS 10. NEW ITEMS INCLUDE NEW ACCESSIBLE PARKING SIGNAGE 1 1 1 ACCESSIBLE PARKING NOTES: 1. COMPACT EXISTING GRAVEL, TREAT ACCESSIBLE AISLE, AND 5FT ACCESSIBLE ROUTE IDENTIFIED WITH "GRAVEL LOK" WHICH IS COMPLIANT WITH ADA REQUIREMENTS FOR HARD NON -SLIP SURFACES. SEE PLANS FOR CLARITY ON WHERE TO PROVIDE "GRAVEL LOK" TO EXISTING HARD SURFACE 2. PROVIDE NEW POLE MOUNTED OR BUILDING MOUNTED VAN ACCESSIBLE PARKING SIGNAGE 3. PAINT VAN ACCESSIBLE AISLE AT EXISTING GRAVEL AREA TREATED WITH "GRAVEL LOK". AND PAINT ACCESSIBLE SYMBOL AT PARKING SPACE 4. PROVIDE NEW POLE MOUNTED OR BUILDING MOUNTED ACCESSIBLE PARKING SIGNAGE 5. PAINT ACCESSIBLE AISLE AT EXISTING HARD SURFACE AREA AND PAINT ACCESSIBLE SYMBOL AT PARKING SPACE 1 WHEEL STOP NOTES: 1. SEE PLAN FOR LOCATION OF NEW WHEEL STOPS. WHEEL ST OP SHALL BE EQUAL OR BETTER THAN 6FT PLASTIC GRAY WHEEL STOP MODEL NO. H -2309GR 72X6X3 BY MANUFACTURER ULINE. INSTALL 3 QTY #4 REINFORCING BARS TO ANCHOR. EMBED AT LEAST 18". 2. SEE PLAN FOR UNMARKED GRAVEL PARKING SPACES TO LOCATE NEW WHEEL STOPS 1 1 1 1 1 1 ALL CONDITIONS ARE EXISTING. EXCEPT AS NOTED IN RED. THE GREEN AREAS ARE EXISTING LANDSCAPING. NO CHANGES ARE REQUIRED. GRADING IS NOT REQUIRED. THE WHITE IS EXSTING HARD SURFACE. NO CHANGES ARE REQUIRED. 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 No. Description Date 0 Issue for Construction 3/25/25 1 Permit Revisions 4/19/25 2 Permit Revisions 5/14/25 Page 10 of 205 MIDLAND CART COMPANY A100 OFFICE A101 BATH A102 VACANT STORAGE B100 OFFICE B101 BATH B102 VACANT STORAGE C100 OFFICE C101 BATH C102 OFFICE D102 OFFICE D103 BREAK D104 BATH D105 BATH D106 BATH D107 TOP TURF E100 OFFICE E101 BATH E102 JAN E103 SHOWER E104 SECURE STORAGE E105 Room Legend BATH BREAK Closet JAN MIDLAND CART COMPANY OFFICE SECURE STORAGE SHOWER SOUND DESIGN SOUND DESIGN STORAGE TOP TURF VACANT STORAGE FORT MILL HIGHWAY 49' - 9 1/2" RECENTLY NEW TENANT 50' - 7" 97' - 0" EXISTING TENANT SINCE 2010 96' - 6 1/2" EXISTING TENANT SINCE 2010 83' - 0" RECENTLY NEW TENANT 60' - 3" Closet E106 OFFICE D101 SOUND DESIGN STORAGE D100A SOUND DESIGN D100B S-2 OCCUPANCY 98' - 0" EXISTING WALL TO BE COVERED WITH NEW 2HR FIRE BARRIER SHAFT WALL PER UL U417. CONTINUITY AT HEAD AND JAMB OF WALL SHALL BE EQUAL TO UL DESIGN CJ -D-004 PROVIDE 36" REAR GRAB BAR PROVIDE 42" SIDE GRAB BAR PROVIDE 18" VERTICAL GRAB BAR AT WATER CLOSETS PROVIDE 36" REAR GRAB BAR PROVIDE 42" SIDE GRAB BAR PROVIDE 18" VERTICAL GRAB BAR AT WATER CLOSET SEE ACCESSIBLE NOTE 4&5 RIGID FIBERLGASS SHEETS ARE CLASS 1 COMMODITY. IT IS STORED IN PILES ON 4 ’X4 ’ PALLETS. NON -COMBUSTIBLE STORAGE ITEMS ONLY RIGID FIBERLGASS SHEETS LIGHT MANUFACTURING EXISTING ELECTRIC CART STORAGE. CHARGING STATION IS NOT REQUIRED OR PROVIDED SOUND DESIGN IS EXISTING TENANT SPACE WITH PERMIT. NO CHANGES REQUIRED. SPACE SHOWN FOR DOCUMENTATION ONLY. DOCK EXISTING LANDSCAPING TO REMAIN NO CHANGES REQUIRED SIDE YARD SETBACK 15' - 0" SIDE YARD SETBACK 15' - 0" FRONT YARD SETBACK 50' - 0" REAR YARD SETBACK 15' - 0" EXISTING BUILDING ENCROACHES INTO SETBACK. POSSIBLY BUILT PRIOR TO THE ADOPTION OF THE CURRENT ZONING ORDINANCE; THUS IT IS LEGAL NON - CONFORMING AND GRANDFATHERED TO ALLOW ENCROACHMENT INTO SETBACK. BUILDING BUILT IN 1978. EXISTING FORK LIFT DRIVE APRON FOR COILING DOORS EXISTING BUILDING ENCROACHES INTO SETBACK. POSSIBLY BUILT PRIOR TO THE ADOPTION OF THE CURRENT ZONING ORDINANCE; THUS IT IS LEGAL NON - CONFORMING AND GRANDFATHERED TO ALLOW ENCROACHMENT INTO SETBACK. BUILDING BUILT IN 1978. A1.0 6 FIRE EXTINGUISHER FIRE EXTINGUISHER FIRE EXTINGUISHER FIRE EXTINGUISHER FIRE EXTINGUISHER FIRE EXTINGUISHER EXIT DISTANCE IS 70FT OCCUPANT LOAD AT DOOR IS 5 PEOPLE: THE DOOR CAPACITY IS 360 PEOPLE THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH THE EXISTING DOOR WIDTH IS 72" AREA IS S -1 OCCUPANCY. OCCUPANT LOAD CALCULATION 2512 SQFT / 500 SQFT PERSON = 5 PERSON AREA IS S -2 OCCUPANCY. OCCUPANT LOAD CALCULATION 4949 SQFT / 500 SQFT PERSON = 10 PERSON EXIT DISTANCE IS 90 FT OCCUPANT LOAD AT DOOR IS 5 PEOPLE: THE DOOR CAPACITY IS 170 PEOPLE THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH THE EXISTING DOOR WIDTH IS 36" EXIT DISTANCE IS 90 FT OCCUPANT LOAD AT DOOR IS 5 PEOPLE: THE DOOR CAPACITY IS 170 PEOPLE THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH THE EXISTING DOOR WIDTH IS 36" AREA IS F -2 OCCUPANCY. OCCUPANT LOAD CALCULATION 10 PERSON ACTUAL OCCUPANT LOAD (1004.5 EXCEPTION) 4,906 SQFT EXIT DISTANCE IS 80 FT OCCUPANT LOAD AT EACH DOOR IS 5 PEOPLE: THE DOOR CAPACITY IS 170 PEOPLE THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH THE EXISTING DOOR WIDTH IS 36" AREA IS S -2 OCCUPANCY. OCCUPANT LOAD CALCULATION 4848 SQFT / 500 SQFT PERSON = 10 PERSON EXIT DISTANCE IS 100FT OCCUPANT LOAD AT DOOR IS 5 PEOPLE: THE DOOR CAPACITY IS 170 PEOPLE THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH THE EXISTING DOOR WIDTH IS 36" EXIT DISTANCE IS 45 FT OCCUPANT LOAD AT DOOR IS 5 PEOPLE: THE DOOR CAPACITY IS 170 PEOPLE THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH THE EXISTING DOOR WIDTH IS 36" AREA IS S -2 OCCUPANCY. OCCUPANT LOAD CALCULATION 5000 SQFT / 500 SQFT PERSON = 10 PERSON EXIT DISTANCE IS 67 FT OCCUPANT LOAD AT DOOR IS 5 PEOPLE: THE DOOR CAPACITY IS 170 PEOPLE THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH THE EXISTING DOOR WIDTH IS 36" EXIT DISTANCE IS 60 FT OCCUPANT LOAD AT DOOR IS 5 PEOPLE: THE DOOR CAPACITY IS 170 PEOPLE THE WIDTH FACTOR IS 0.2 PEOPLE PER INCH THE EXISTING DOOR WIDTH IS 36" 7' - 6" OUTDOOR STORAGE OF PROPANE TANKS IN AN APPROVED STORAGE CABINET. SCREENED BY 6FFT TALL WOOD FENCE. EXISTING LANDSCAPING ISLAND 5FT WALK WAY EXISTING COMPACTED HARD SURFACE TO BE TREATED WITH "GRAVEL LOK" . SEE ACCESSIBLE NOTE 1 8' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" EXISTING LANDSCAPING ISLAND 19' - 0" 19' - 0" 23' - 0 1/2" 19' - 0" 1' - 9 1/2" 6' - 6" TYPICAL WHEEL STOP LOCATION. SEE WHEEL STOP NOTE 1&2 SEE ACCESSIBLE NOTE 2&3 EXISTING LANDSCAPING TO REMAIN NO CHANGES REQUIRED EXISTING LANDSCAPING TO REMAIN NO CHANGES REQUIRED EXISTING LANDSCAPING TO REMAIN NO CHANGES REQUIRED EXISTING HARD SURFACE TO REMAIN NO CHANGES REQUIRED EXISTING HARD SURFACE TO REMAIN NO CHANGES REQUIRED 30' - 0" 32' - 0" EXISTING SEPTIC EXISTING SEPTIC EXISTING SEPTIC 12' - 0" 10' - 0" CANOPY 18' - 0" 5' - 0" 5' - 0" 23' - 8 3/4" EXISTING DUMPSTER 6' HEIGHT 6FT OPAQUE WOOD FENCE WITH WOOD GATE DOORS 6FT HIGH WOOD FENCE 20' - 0" 11' - 10 1/2" UNMARKED HARD SURFACE PARKING SPACES TO GET NEW WHEEL STOPS, TYPICAL SEE ACCESSIBLE NOTE 4&5 23' - 2 3/4" UNMARKED HARD SURFACE PARKING SPACES TO GET NEW WHEEL STOPS, TYPICAL EXISTING WELL 5' - 0" 9' - 0" 5' - 0" 5' - 0 1/4" 9' - 0" This drawing and prints are the property of Reddric k Architecture. The reproduction, copying or other use of this draw ing without written consent from Reddrick Architecture is not permitted, except as permitted by the copyright or architectural work s by the US Copy Right Act. Copyright Architectural Seals Project Name Drawing Credits draftsman checker architect Revisions Sheet Title Editable electronic files are available for an addi tional costs. Please contact the architect for those files. Editable ele ctronic files are available for reference only and discrepancy betwee n sealed drawings and editable electronic files shall be reported to the owner and architect for resolution. Digital Plans James Reddrick Architect www.jr-architect.online 980.254.5348 james@jr-architect.online 1333 Rising Oak Dr, Charlotte, NC, 28206 LLC 5/14/25 5/14/2025 10:12:53 PM A1.1 J.Reddrick Warehouse Repairs 2025-1081 Site Plan and Life Safety Plan J.Reddrick J.Reddrick 3/32" = 1'-0" A1.1 2 Site and Life Safety Plan OWNER FORT MILL HIGHWAY LLC PHYSICAL ADDRESS 1081 FORT MILL HWY ACRES 1.91 ACRES PID 0006 -00 -068.01 UNIFIED DEVELOPMENT ORDINANCE ZONING CLASSIFICATION GENERAL BUSINESS (GB) PERMITTED USES LIGHT MANUFACTURING (TABLE 2.5.3) OUTDOOR STORAGE WAREHOUSE INDOOR STORAGE BUSINESS SUPPORT SERVICES PARKING REQUIREMENTS 1 SPACE PER 500 SQFT OF OFFICE SPACE (TABLE 7.2.4) PARKING CALCULATIONS: MIDLAND GOLF CART OFFICE SALE 231 SQFT/250 SQFT = 1 PARKING SPACE MIDLAND STORAGE AREA DOES NOT REQUIRE PARKING VACANT STORAGE -B OFFICE 231 SQFT/500 SQFT = 1 PARKING SPACE VACANT STORAGE -B STORAGE AREA DOES NOT REQUIRE PARKING VACANT STORAGE -C OFFICE 231 SQFT/500 SQFT = 1 PARKING SPACE VACANG STORAGE -C STORAGE AREA DOES NOT REQUIRE PARKING SOUND DESIGN OFFICE 500 SQFT/500SQFT = 1 PARKING SPACE SOUND DESIGN STORAGE AREA DOES NOT REQUIRE PARKING TOP TURF OFFICE 279 SQFT/500 SQFT = 1 PARKING SPACE TOP TURF STORAE AREA DOES NOT REQUIRE PARKING TOTAL PARKING SPACES REQUIRED = 5 PARKING SPACES OR AS INDICATED BY ZONING OFFICIALS TOTAL ACCESSIBLE SPACES REQUIRED = 1 VAN ACCESSIBLE SPACE TOTAL EXISTING PARKING SPACE PROVIDED = 15 EXISTING PARKING SPACES (PROVIDE NEW WHEEL STOPS) TOTAL ACCESSIBLE PARKING SPACES PROVIDED = 1 VAN ACCESSIBLE SPACE + 2 ACCESSIBLE SPACE TOTAL SPACES = 18 PARKING SPACES SETBACKS 50FT FRONT YARD TABLE 2.4 15FT SIDE YARD 15FT REAR YARD N STORAGE NOTES FOR SUITE E 1. RX FERTILIZER ACCUBLEND PELLET FERTILIZER IS A CLASS 1 COMMODITY. IT IS STORED IN 50LB BAGS ON PALLETS 2. PRIME TIME TURF TYPE TALL FESCUE BLEND GRASS SEED IS A CLASS 1 COMMODITY. IT IS STORED IN 50LB BAGS ON PALLETS 3. NUTRITE UREA FRILL AGRICULTURAL GRADE 46 -0-0 PELLET FERTILIZER IS A CLASS 1 COMMODITY. IT IS STORED IN 50LB BAGS ON PALLETS. 4. GATOR EXCEL IRON LIQUID FERTILIZER IS A CLASS 1 COMMODITY. IT IS STORED IN 275 GALLON TOTE ON PALLETS. 5. DIMENSION 2EW HERBICIDE IS A IRRITANT MATERIAL (NOT TOXIC). IT IS STORED IN 30 GALLON DRUM. MAQ NOT TO EXCEED 125 GALLONS INSIDE BUILDING. 6. PROPANE GAS CYLINDERS IS A FLAMMABLE GAS. IT IS STORED IN 8 GALLON CYLINDERS. MAQ NOT TO EXCEED 300 GALLONS. TANKS TO BE STORED OUTSIDE IN AN APPROVED STORAGE CABINET EQUAL TO USA SAFETY PRODUCT " 4 PROPANE TANKS (33 LB) - OUTDOOR - HORIZONTAL STORAGE - STEEL & MESH - GAS CYLINDER CAGE" GENERAL NOTES 1. ALL CONDITIONS ARE EXISTNG UNLESS NOTED OTHERWISE 2. WORK INCLUDES A. PROVIDING ACCESSIBLE PARKING SPACE, B. GRAB BARS AT RESTROOM SUITES A, B, C, AND E C. ADDING A 2HR FIRE BARRIER TO SEPARATE S -2 SPACE FROM S -1 SPACE BETWEEN SUITE A AND SUITE B D. PROVIDE MANUAL FIRE EXTINGUISHERS AT ALL SUITES E. PROVIDING EVALUATION AND DOCUMENTATION OF CURRENT FACILITY PLAN STORAGE F. EXISTING BATH FACILITIES ARE REPLACEMENT OF FIXTURES DONE IN A MANNER THAT MAINTAINED THE LEVEL OF ACCESSIBLITY PER SOUTH CAROLINA EXISTING BUILDING CODE SECTION 401.2; THUS FIXTURES DOES NOT HAVE TO COMPLY WITH CURRENT ACCESSIBILITY REQUIREMENTS. HOWEVER GRAB BARS ARE ADDED. 3. LIFE SAFETY TRAVEL DISTANCE SHALL NOT EXCEED 200FT TO AN EXIT. SEE PLAN FOR ACTUAL TRAVEL DISTANCE. 4. AT EACH EXIT DOOR PROVIDE A TACTILE EXIT SIGN 5. AT EACH SUITE A FIRE EXTINGUISHER TO BE PROVIDED 6. ALL EXISTING EXIT DOORS SHALL ALLOW FREE EGRESS. 7. ALL GRAVEL DRIVEWAYS/PARKING, SIDEWALKS, AND LANDSCAPING ARE EXISTING. NO GRADING IS REQUIRED. 8. NEW ITEMS INCLUDE "GRAVEL LOK" TREATMENT AT EXISTING GRAVEL WALKWAY. SEE PLAN FOR LOCATION. 9. NEW ITEMS INCLUDE NEW WHEEL STOPS 10. NEW ITEMS INCLUDE NEW ACCESSIBLE PARKING SIGNAGE 1 1 1 ACCESSIBLE PARKING NOTES: 1. COMPACT EXISTING GRAVEL, TREAT ACCESSIBLE AISLE, AND 5FT ACCESSIBLE ROUTE IDENTIFIED WITH "GRAVEL LOK" WHICH IS COMPLIANT WITH ADA REQUIREMENTS FOR HARD NON -SLIP SURFACES. SEE PLANS FOR CLARITY ON WHERE TO PROVIDE "GRAVEL LOK" TO EXISTING HARD SURFACE 2. PROVIDE NEW POLE MOUNTED OR BUILDING MOUNTED VAN ACCESSIBLE PARKING SIGNAGE 3. PAINT VAN ACCESSIBLE AISLE AT EXISTING GRAVEL AREA TREATED WITH "GRAVEL LOK". AND PAINT ACCESSIBLE SYMBOL AT PARKING SPACE 4. PROVIDE NEW POLE MOUNTED OR BUILDING MOUNTED ACCESSIBLE PARKING SIGNAGE 5. PAINT ACCESSIBLE AISLE AT EXISTING HARD SURFACE AREA AND PAINT ACCESSIBLE SYMBOL AT PARKING SPACE 1 WHEEL STOP NOTES: 1. SEE PLAN FOR LOCATION OF NEW WHEEL STOPS. WHEEL ST OP SHALL BE EQUAL OR BETTER THAN 6FT PLASTIC GRAY WHEEL STOP MODEL NO. H -2309GR 72X6X3 BY MANUFACTURER ULINE. INSTALL 3 QTY #4 REINFORCING BARS TO ANCHOR. EMBED AT LEAST 18". 2. SEE PLAN FOR UNMARKED GRAVEL PARKING SPACES TO LOCATE NEW WHEEL STOPS 1 1 1 1 1 1 ALL CONDITIONS ARE EXISTING. EXCEPT AS NOTED IN RED. THE GREEN AREAS ARE EXISTING LANDSCAPING. NO CHANGES ARE REQUIRED. GRADING IS NOT REQUIRED. THE WHITE IS EXSTING HARD SURFACE. NO CHANGES ARE REQUIRED. 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 No. Description Date 0 Issue for Construction 3/25/25 1 Permit Revisions 4/19/25 2 Permit Revisions 5/14/25 Page 11 of 205 Page 12 of 205 Page 13 of 205 Page 14 of 205 Page 15 of 205 Page 16 of 205 Agenda Item Summary Ordinance # / Resolution # : Contact Person / Sponsor: Department: Date Requested to Be on Agenda: 2/5/2026 Council Action Requested: Strategic Plan Focus Alignment: Points to Consider: Funding and Liability Factors: Recommendation: Attachments: 1. notice-map 2. Scanned application_Redacted 3. PreliminaryPlat_2026 4. TRC Not Approved Letter 1-22-2026 5. TrafficImpactAnalysis_2023 6. ICE REview Memo TIA May 2024 7. ApplicantresponsetoTIAComments_November 2024 8. TRC Letter January 2025 9. Deed 1529-361529_36 10. Deed 1715_201 Page 17 of 205 Page 18 of 205 Page 19 of 205 Page 20 of 205 Page 21 of 205 Page 22 of 205 Page 23 of 205 Page 24 of 205 Page 25 of 205 Lancaster County Planning Department P. O. Box 1809 Lancaster, SC 29721 803.285.6005 planning@lancastercountysc.net 969 E. 7th Street, Suite 100 Charlotte, NC 28204 R. B. Pharr & Associates, P.A. January 22, 2026 Charles Vander Pleog Parcel(s) Stage Location Project Number Status Preliminary Plat Not Approved 0006-00-057.00 9901 & 9831 Barberville Road Project Name Barberville Commercial 20231869 Dear: Charles Vander Pleog We have completed our review of the plan identified above. The comments listed on the attached report must be addressed and revised plans submitted with a response letter. If the attached comments require changes to the plans, please submit the requisite number of sets, along with a pdf of the plan set on a CD, to the Lancaster County Planning Department. Once revised plans are received, they will be submitted to staff for review. *Please be aware that plans will not be routed for review without a response letter* Sincerely, Page 1 of 31/22/2026 Page 26 of 205 Plan Review Comments County Engineer - Stephen Blackwelder - 8035482406 sblackwelder@lancastercountysc.gov Approved Review Comments: E911 Address - Sandra Burton - (803) 416-9325 sburton@lanc911.com Approved Review Comments: No issues noted. Fire Marshal - Mike Magette - 8032838888 jmagette@lancastercountysc.gov Conditional Review Comments: 1. Dead end fire apparatus access roads longer than 150 feet in length will require an approved turnaround. Plan shows an easement to Fort Mill Highway which will need to be constructed at the same time as Melanie Lane to avoid a dead end fire apparatus access road. LC Water & Sewer District - James Hawthorne - (803) 285-6919 jhawthorne@lcwasd.org Approved Review Comments: Planning - Kirsten Willis - 803-285-6005 kwillis@lancastercountysc.gov Not Approved Review Comments: 1. Preliminary is missing site analysis. Please provide site analysis that details existing conditions. (Reference Chp. 9.2.5 & 9.2.5.A p. 295-296) a. HCO frontage buffers are depicted on survey but include tree preservation/planting plan whichever is applicable within the site analysis. 2. Plan includes incorrect buffer depiction/notation. Please include in notes that details buffer type and which option chosen. Adjacent parcels, MDR, which requires a Type B. (Reference Chp. 7.1.5.A, p. 211) for requirement, reference Chp. 7.1.5.B.2 p. 212 for options/opacity etc. 3.TIA will require amendment. Proposed build out year will need to be updated as well as how second outlet onto Fort Mill Highway was removed and original TIA doesn't include all 7 parcels submitted via this preliminary. 4. Parcel 3 missing front setback of 25'. (Reference Chp. 2.4, p. 23) 5. Parcel 4 missing front setback of 50', and side setbacks 15'. (Reference Chp. 2.4, p. 23) 6. Parcel 5 missing side setbacks 15'. (Reference Chp. 2.4, p. 23) 7. Parcel 6 missing side setbacks of 15' and has incorrect rear setback depicted, required 15'. (Reference Chp. 2.4, p. 23) 8. Certificate of Approval for Planning Dept. not necessary, please remove. Page 2 of 31/22/2026 Page 27 of 205 LC School District - Jonathan Duke - 803-416-8010 john.duke@lcsd.k12.sc.us No Review Needed Review Comments: SCDOT - David Gamble - (803) 385-4280 GambleDD@scdot.org No Review Done Review Comments: Encroachment permits has already been issued for this site. Page 3 of 31/22/2026 Page 28 of 205 TRAFFIC IMPACT STUDY for the Barberville Road Development Located in Lancaster County, South Carolina Prepared for Moody Holdings & Development Prepared by Ramey Kemp Associates, Inc. June 2023 RKA Project #23126 Page 29 of 205 TRAFFIC IMPACT STUDY for the Barberville Road Development Located in Lancaster County, South Carolina Prepared for Moody Holdings & Development 6201 Fairview Rd, Ste 200 Charlotte, North Carolina 28210 Prepared by Ramey Kemp Associates, Inc. 1411 Gervais Street, Suite 150 Columbia, South Carolina 29201 June 2023 RKA Project #23126 Page 30 of 205 Barberville Road TIS | i Table of Contents EXECUTIVE SUMMARY .................................................................................................................. iii 1.1. Project Background ............................................................................................. 1 1.2. Existing Roadway Conditions ........................................................................... 4 1.3. Existing Traffic Count ........................................................................................ 4 1.4. Driveway Location ............................................................................................. 4 2. PROJECT TRAFFIC ...................................................................................................................... 7 2.1. Proposed Land Uses ........................................................................................... 7 2.2. Trip Generation Estimates ................................................................................. 7 2.3. Trip Distribution & Assignment ....................................................................... 8 3. TRAFFIC VOLUME DEVELOPMENT .................................................................................... 11 3.1. Future No-Build Traffic Volumes ................................................................... 11 3.2. Build Out Traffic Volumes ............................................................................... 11 4. TRAFFIC IMPACT ANALYSIS ................................................................................................. 14 4.1. Turn-Lane Analysis .......................................................................................... 14 4.2. Intersection LOS Analysis ................................................................................ 14 5. SUMMARY OF FINDINGS AND RECOMMENDATIONS ................................................. 18 Page 31 of 205 Barberville Road TIS | ii List of Tables Table 1 – Street Inventory ......................................................................................................................... 4 Table 2 – Trip Generation Estimates ....................................................................................................... 7 Table 3 – HCM 6th Edition LOS Criteria for Unsignalized and Signalized Intersections ................ 14 Table 4 – Unsignalized and Signalized Intersection Analysis Results ............................................. 15 Table 5 – Unsignalized and Signalized Intersection Analysis Results ............................................. 16 List of Figures Figure 1 – Project Location Map .............................................................................................................. 2 Figure 2 – Conceptual Site Plan ............................................................................................................... 3 Figure 3 – Existing Lane Configuration .................................................................................................. 5 Figure 4 – Existing (2023) Peak-Hour Traffic Volumes ........................................................................ 6 Figure 5 – Project Trip Distribution ......................................................................................................... 9 Figure 6 – Project Trip Assignment ....................................................................................................... 10 Figure 7 – No-Build (2026) Peak-Hour Traffic Volumes .................................................................... 12 Figure 8 – Build (2026) Peak-Hour Traffic Volumes ........................................................................... 13 Figure 9 – Proposed Lane Configuration .............................................................................................. 17 List of Appendices A) Traffic Scoping B) Traffic Count Data C) Traffic Volume Development Worksheets and ITE Trip Generation Worksheets D) Turn-Lane Analysis Worksheets E) Capacity Analysis Page 32 of 205 Barberville Road TIS | iii EXECUTIVE SUMMARY A traffic impact study was conducted for the proposed Barberville Road development in accordance with SCDOT guidelines. The development is located west of Barberville Road (S-29-42) and north of SC 160 in Lancaster County, South Carolina. The development is proposed to consist of a roughly 120 student school/daycare center, 18,000 SF of retail space and 8,000 SF of office space. The site will have one access on Barberville Road, with internal connections to adjacent parcels. Based on the anticipated build out volumes, a northbound left turn lane is warranted and recommended on Barberville Road at the access point. An auxiliary southbound right turn lane is not warranted. The site access should include one ingress and two egress lanes (50’ storage) and should be designed to provide proper sight distances and meet SCDOT design criteria. With construction of the project, Barberville Road & Harbor Bay Drive should continue to function adequately. The intersection of Fort Mill Highway (SC 160) at Barberville Road expected to experience delays with or without the development. Lancaster County guidelines specify that if the LOS on a principal arterial is below LOS D, then the TIS “shall identify those improvements required to ensure that development related traffic demands result in no net reduction in LOS, and identify additional improvements needed to raise the level of service on the applicable street to the adopted LOS standard.” The signalized Fort Mill Highway & Barberville Road intersection currently operates as an LOS E and is expected to reach LOS F in the No Build conditions. Auxiliary turn lanes are already present on SC 160 and on southbound Barberville Road. Raising the level of service on the Fort Mill Highway (SC 160) at Barberville Road to a LOS D would require additional eastbound and westbound through lanes along SC 160, along with signal timing optimization. TIS’s for the background developments (2,000+ residential units) did not recommend widening SC 160 as part of the background conditions. The proposed development should not add significant amounts of traffic to the area. No additional improvements to the area roadways are recommended as part of this development. Page 33 of 205 Barberville Road TIS | 1 1. INTRODUCTION The purpose of this report is to document a traffic impact study for the proposed Barberville Road development in accordance with SCDOT guidelines. This report summarizes the procedures and findings of the traffic impact study. Traffic scoping documentation is provided in Appendix A. 1.1. Project Background The development is located west of Barberville Road (S-29-42) and north of SC 160 in Lancaster County, South Carolina. The development is proposed to consist of a roughly 120 student school/daycare center, 18,000 SF of retail space and 8,000 SF of office space. The site will have one access on Barberville Road, with internal connections to adjacent parcels. The traffic impact study considers the weekday AM peak period (between 7:00 AM and 9:00 AM) and the weekday PM peak period (between 4:00 PM and 6:00 PM) as the study time frames. The following intersections are studied:  Fort Mill Highway (SC 160) & Barberville Road (S-29-42)/ Stock Lane  Barberville Road (S-29-42) & Harbor Bay Drive  Barberville Road (S-29-42) & Fortson Road /Site Access Future-year analyses assume 2026 conditions as the Build scenario. Figure 1 shows the location of the project site, and Figure 2 illustrates the conceptual site plan. Page 34 of 205 Barberville Road TIS - Traffic Impact Study Figure 1 - Project Location Map Page 2 Barberville RoadHarbor Bay LaneSite Access Page 35 of 205 Barberville Road TIS - Traffic Impact Study Figure 2 - Conceptual Site Plan Page 3 Page 36 of 205 Barberville Road TIS | 4 1.2. Existing Roadway Conditions A review of the existing roadway conditions in the study area was conducted and is summarized in Table 1. Figure 3 illustrates the existing lane geometry. Table 1 – Street Inventory 1.SCDOT Count Station 29-0163; 2.SCDOT Count Station 29-0195 1.3. Existing Traffic Count Vehicle turning movement counts were collected in May 2023 for the AM peak period (7:00 AM to 9:00 AM) and PM peak period (4:00 PM to 6:00 PM) at the following intersections:  Fort Mill Highway (SC 160) & Barberville Road (S-29-42)/ Stock Lane  Barberville Road (S-29-42) & Harbor Bay Drive All counts were conducted while the local school district was in session. The 2023 raw traffic volumes are provided in Appendix A. Existing traffic volumes are illustrated in Figure 4. 1.4. Driveway Location The development is expected to provide one (1) full access driveway on Barberville Road. The proposed site Access is located approximately 670 feet north of Fort Mill Highway. The proposed driveways appear to meet the SCDOT ARMS spacing requirements. Facility Name Route # Typical Cross Section Posted Speed Limit Maintained By 2021 AADT Fort Mill Highway SC 160 3-lane undivided (TWLTL) 45 MPH SCDOT 15,200 1 Barberville Road S-29-42 2-lane undivided 40 MPH SCDOT 7,900 2 Stock Lane N/A 2-lane undivided N/P Local N/A Harbor Bay Drive N/A 2-lane undivided N/P Local N/A Fortson Road N/A 2-lane undivided N/P Local N/A Page 37 of 205 Page 5 Barberville Road TIS - Traffic Impact Study Figure 3 - Existing Lane Configuration 260' 210'220' Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane Harbor Bay Lane Page 38 of 205 2 '2'! 3 '3'! 1 '1'! Page 6 0 (1)(0)(0) Barberville Road TIS - Traffic Impact Study Figure 4 - Existing (2023) Peak-Hour Traffic Volumes 0 (0) (312) 525 (785) 759 000 (0) 2610124 120 (202) 565 (695) (511)(145)(0)(366)641388 (516) (22) 19 (32)(479)5636 (10) 31 10369(5)(494) Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane Harbor Bay Lane Page 39 of 205 Barberville Road TIS | 7 2. PROJECT TRAFFIC 2.1. Proposed Land Uses The Barberville Road development is proposed to contain a 120 student school/daycare center, with additional parcels that are envisioned to include approximately 18,000 SF of retail space and 8,000 SF of office space. The project site is currently vacant. 2.2. Trip Generation Estimates The trip generation potential was estimated using information contained in ITE’s Trip Generation Manual, 11th Edition (2021) for land use code (LUC) 565 – Day Care Center, (LUC) 822 Strip Retail Plaza and (LUC) 712 – Small Office Building . The trip generation estimates for the weekday daily, the weekday AM peak-hour of the adjacent street, and the weekday PM peak-hour of the adjacent street time periods are shown in Table 2. Table 2 – Trip Generation Estimates Page 40 of 205 Barberville Road TIS | 8 2.3. Trip Distribution & Assignment New external traffic expected to be generated was distributed and assigned to the roadway network based on the existing patterns and surrounding land uses. The general distribution of new external project trips was assumed to be:  70% to/from the south via Barberville Road and  30% to/from the north via Barberville Road The directional distribution assumptions are shown in Figure 5. The assignment of the project traffic is shown in Figure 6. Page 41 of 205 30%30%30%70% 30% 70%50%20% Page 9 Barberville Road TIS - Traffic Impact Study Figure 5 - Project Trip Distribution 20% 50% Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane Site AccessHarbor Bay Lane30% 50%20% Project Site Page 42 of 205 2 '2'! 3 '3'! 1 '1'! Page 10 Barberville Road TIS - Traffic Impact Study Figure 6 - Project Trip Assignment 16 (20) (53) 41 3112 43 (73)(58)(23)57 (35) 18 (81) 25 (32)(35) 1825 (32) Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane Site AccessHarbor Bay LaneProject Site Page 43 of 205 Barberville Road TIS | 11 3. TRAFFIC VOLUME DEVELOPMENT 3.1. Future No-Build Traffic Volumes To develop an annual background growth rate for use in the analysis, count data was reviewed from the years 2017 to 2020 at SCDOT Count Station 29-0163 and 29-195. Reviewing the historic growth and observing the growth pattern in the surrounding area, a 1.0% annual growth was adopted for this study. This annual growth rate was utilized to develop the 2026 No-Build traffic volumes. Several vested developments were considered for the study area. Site traffic from the Lodges at Indian Land, Harrisburg Road Residential (Sugar Creek), Redwood Apartments, Pettus Pond, Patterson Preserve and Patterson Lane Apartments were included in the vested trips. The vested projects include a total of 2,014 residential units expected to be completed before the Barberville Road development build out. None of the Traffic Impact Studies for these developments recommended any improvements to the Fort Mill Highway (SC 160) at Barberville Road. The site trips from the vested developments are provided in Appendix A. The 2026 No-Build volumes are illustrated in Figure 7. 3.2. Build Out Traffic Volumes The site generated traffic volumes were added to the 2026 No-Build traffic volumes to determine the 2026 Build volumes. The 2026 Build volumes are illustrated in Figure 8. Volume development worksheets are included in Appendix B. Page 44 of 205 2 '2'! 3 '3'! 1 '1'! Page 12 0 (1)(0)(0) Barberville Road TIS - Traffic Impact Study Figure 7 - No-Build (2026) Peak-Hour Traffic Volumes 0 (0) (424) 573 (865) 821 000 (0) 3610167 159 (242) 633 (749) (663)(208)(0)(412)727531 (625) (23) 20 (33)(630)5722 (10) 32 10511(5)(603) Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane Harbor Bay Lane Page 45 of 205 2 '2'! 3 '3'! 1 '1'! Page 13 0 (1)(0)(0) Barberville Road TIS - Traffic Impact Study Figure 8 - Build (2026) Peak-Hour Traffic Volumes 0 (0) (477) 614 (865) 821 000 (0) 3920179 175 (262) 633 (749) 43 (73)(663)(266)(0)(435)57727 (35) 18 (81) 25531(32)(625) (23) 20 (33)(665)5740 (10) 32 10536(5)(635) Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane Site AccessHarbor Bay LaneProject Site Page 46 of 205 Barberville Road TIS | 14 4. TRAFFIC IMPACT ANALYSIS 4.1. Turn-Lane Analysis Auxiliary turn-lane analyses were conducted using the 2026 Build volumes. Turn-lane analyses were considered based on the SCDOT Roadway Design Manual (RDM) Section 9.5.1. Based on the anticipated build out volumes, a northbound left turn lane is warranted and recommended on Barberville Road at the access point. An auxiliary southbound right turn lane is not warranted. The site access should be designed to provide proper sight distances and meet SCDOT design criteria. Turn-lane analyses are provided in Appendix D. 4.2. Intersection LOS Analysis Intersection analyses were conducted for the study intersections considering 2023 Existing conditions, 2026 No-Build conditions, and 2026 Build conditions. This analysis was conducted using the Transportation Research Board’s Highway Capacity Manual 6th Edition (HCM 6th Edition) methodologies of the Synchro, Version 11 software. Intersection level of service (LOS) grades range from LOS A to LOS F, which are directly related to the level of control delay at the intersection and characterize the operational conditions of the intersection traffic flow. LOS A operations typically represent ideal, free-flow conditions where vehicles experience little to no delays, and LOS F operations typically represent poor, forced-flow (bumper-to-bumper) conditions with high vehicular delays and are generally considered undesirable. Table 3 summarizes the HCM 6th Edition control delay thresholds associated with each LOS grade for unsignalized and signalized intersections. Table 3 – HCM 6th Edition LOS Criteria for Unsignalized and Signalized Intersections Unsignalized Intersections Signalized Intersections LOS Control Delay per Vehicle (seconds) LOS Control Delay per Vehicle (seconds) A ≤ 10 A ≤ 10 B > 10 and ≤ 15 B > 10 and ≤ 20 C > 15 and ≤ 25 C > 20 and ≤ 35 D > 25 and ≤ 35 D > 35 and ≤ 55 E > 35 and ≤ 50 E > 55 and ≤ 80 F > 50 F > 80 Page 47 of 205 Barberville Road TIS | 15 As part of the intersection analysis, SCDOT’s default Synchro parameters were utilized. A constant PHF of 0.92 was applied for future year analysis. Existing heavy vehicle percentages were utilized for all analysis scenarios, with a minimum percentage of 2% considered. Using the Synchro software, intersection analyses were conducted for the weekday AM peak-hour and weekday PM peak-hour time periods. A 150-foot storage northbound left turn lane was analyzed in the build conditions at the site access. The results of the intersection analyses are summarized in Table 4. Table 4 – Unsignalized and Signalized Intersection Analysis Results Intersection Approach LOS/Delay (seconds) 2023 Existing Conditions 2026 No-Build Conditions 2026 Build Conditions AM PM AM PM AM PM Fort Mill Highway (SC 160) & Barberville Road (Signalized) EB C/34.9 C/19.2 E/66.7 C/34.0 E/76.3 D/39.6 WB C/20.3 C/27.4 E/64.6 F/148.5 D/51.9 F/168.0 NB A/0.0 E/75.5 A/0.0 F/88.7 A/0.0 F/88.7 SB E/70.4 F/198.9 F/84.3 F/86.2 F/105.8 F/99.2 Overall D/36.5 E/58.8 E/69.5 F/84.3 E/75.7 F/95.8 Barberville Road & Harbor Bay Drive (Unsignalized) EB1 C/19.4 C/15.9 C/26.5 C/20.1 D/27.8 C/21.5 NB2 A/8.2 A/8.6 A/8.6 A/9.0 A/8.7 A/9.2 Barberville Road & Site Access (Unsignalized) EB -- -- -- -- C/20.3 D/26.9 NB2 -- -- -- -- A/8.9 A/9.5 1.LOS for major street left-turn movement; 2.LOS for minor street approach With construction of the project, Barberville Road & Harbor Bay Drive should continue to function adequately. The site access should include one ingress and two egress lanes (50’ storage). The intersection of Fort Mill Highway (SC 160) at Barberville Road expected to experience delays with or without the development. Lancaster County guidelines specify that if the LOS on a principal arterial is below LOS D, then the TIS “shall identify those improvements required to ensure that development related traffic demands result in no net reduction in LOS, and identify additional improvements needed to raise the level of service on the applicable street to the adopted LOS standard.” The signalized Fort Mill Highway & Barberville Road intersection currently operates as an LOS E. and is expected to reach LOS F in the No Build conditions. Auxiliary turn lanes are already present on SC 160 and on southbound Barberville Road. To raise the level of service on the Fort Mill Page 48 of 205 Barberville Road TIS | 16 Highway (SC 160) at Barberville Road to a LOS D, additional eastbound and westbound through lanes along SC 160 would be required, along with signal timing optimization. TIS’s for the background developments (2,000+ residential units) did not recommend widening SC 160 as part of the background conditions. The proposed development should not add significant amounts of traffic to the area. No additional improvements to the area roadways are recommended as part of this development. If SC 160 were widened to provide a four-lane section, the LOS would be as shown in Table 5. Table 5 – Unsignalized and Signalized Intersection Analysis Results Intersection Approach LOS/Delay (seconds) 2026 Build Improved Conditions AM PM Fort Mill Highway (SC 160) & Barberville Road (Signalized) EB C/34.5 C/27.5 WB C/28.6 C/33.5 NB A/0.0 F/88.7 SB E/77.8 E/73.3 Overall D/41.6 D/40.0 Figure 9 shows the recommended lane configuration for the Build (2026) condition. A capacity analysis summary is proved in Appendix D. Page 49 of 205 Page 17 Barberville Road TIS - Traffic Impact Study Figure 9 - Proposed Lane Configuration 250' 225'200' 150' 50' Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane Site AccessHarbor Bay LaneProject Site Page 50 of 205 Barberville Road TIS | 18 5. SUMMARY OF FINDINGS AND RECOMMENDATIONS A traffic impact study was conducted for the proposed Barberville Road development in accordance with SCDOT guidelines. The development is located west of Barberville Road (S-29-42) and north of SC 160 in Lancaster County, South Carolina. The development is proposed to consist of a roughly 120 student school/daycare center, 18,000 SF of retail space and 8,000 SF of office space. The site will have one access on Barberville Road, with internal connections to adjacent parcels. Based on the anticipated build out volumes, a northbound left turn lane is warranted and recommended on Barberville Road at the access point. An auxiliary southbound right turn lane is not warranted. The site access should include one ingress and two egress lanes (50’ storage) and should be designed to provide proper sight distances and meet SCDOT design criteria. With construction of the project, Barberville Road & Harbor Bay Drive should continue to function adequately. The intersection of Fort Mill Highway (SC 160) at Barberville Road expected to experience delays with or without the development. Lancaster County guidelines specify that if the LOS on a principal arterial is below LOS D, then the TIS “shall identify those improvements required to ensure that development related traffic demands result in no net reduction in LOS, and identify additional improvements needed to raise the level of service on the applicable street to the adopted LOS standard.” The signalized Fort Mill Highway & Barberville Road intersection currently operates as an LOS E. and is expected to reach LOS F in the No Build conditions. Auxiliary turn lanes are already present on SC 160 and on southbound Barberville Road. Raising the level of service on the Fort Mill Highway (SC 160) at Barberville Road to a LOS D would require additional eastbound and westbound through lanes along SC 160, along with signal timing optimization. TIS’s for the background developments (2,000+ residential units) did not recommend widening SC 160 as part of the background conditions. The proposed development should not add significant amounts of traffic to the area. No additional improvements to the area roadways are recommended as part of this development. Page 51 of 205 APPENDIX A Traffic Scoping Page 52 of 205 1 Tahera Anjuman From: Love, Allison C. <LoveAC@scdot.org> Sent: Wednesday, March 29, 2023 12:43 PM To: Tahera Anjuman Cc: Gamble, David D.; Stephen Blackwelder Subject: RE: Traffic Scoping for SC 160 and Barberville Road TIS Development Good afternoon, Tahera. I agree with the times for traffic counts. Please make sure they are recorded while school is in regular session, and not while school is out for spring break. Please include these study intersections:  Harbor Bay Drive/Barberville Road  Site Access/Fortson Road  Barberville Road/SC Highway 160/Stock Lane Lancaster County staff can tell you about any developments in the area that have received site plan or preliminary plat approval, but have not been built. It looks like the road into the adjacent subdivision to the north was stubbed as a cul-de-sac for connectivity between the neighborhood and this parcel. If that is the case, then the Department would support that connection, as the proposed commercial uses could be patronized by the residents without adding turn movements onto Barberville Road. Thank you, Allison From: Tahera Anjuman <tanjuman@rameykemp.com> Sent: Friday, March 24, 2023 9:11 AM To: Love, Allison C. <LoveAC@scdot.org> Subject: Traffic Scoping for SC 160 and Barberville Road TIS Development *** This is an EXTERNAL email. Please do not click on a link or open any attachments unless you are confident it is from a trusted source. *** Good Morning Allison, I hope you are doing well. We have a request for a proposal near SC 160 and Barberville Road in Lancaster County. Please see attached site plan. The development is proposed to consist of a roughly 120 student school/daycare Center, with additional parcels that are envisioned to include approximately 18,000 SF of retail space and 8,000 SF of office space. I am assuming the following traffic count for the project between 7-9AM and 4-6PM should be sufficient. Please let me know your thoughts and what vested developments you would like us to consider for this project. If you have any other considerations or concerns, please do let me know. I appreciate your guidance.  SC 160 & Barberville Road (S-29-42) Thanks, Page 53 of 205 1 Tahera Anjuman From: Chanda Kirkland <CKirkland@lancastersc.net> Sent: Friday, May 19, 2023 1:05 PM To: Tahera Anjuman Cc: Stephen Blackwelder Subject: RE: Traffic Scoping for SC 160 and Barberville Road TIS Development Good Morning Anjuman, Below are vested projects that may need to be included in the study. 1. The Lodges Development consisting of multi-family apartments, townhomes and cottages. 2. Sugar Creek 3. Redwood 4. Pettus Pond 5. Patterson Preserve 6. Tapestry Patterson Lane Apartments You can use our online project portal to search the above projects to hopefully get the information you need if no the engineer contact information is also listed. Hope this information helps. Chanda www.mylancastersc.org Chanda Kirkland, Development Service Coordinator Building Lancaster County Government PO Box 1809 101 N Main St Lancaster, SC 29720 P: (803) 416-9390 F: (877) 636-3035 CKirkland@lancastersc.net CONFIDENTIALITY NOTICE: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain private, restricted and/or legally privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply email and destroy all copies of the original message. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of Lancaster County. Finally, the recipient should check this email and any attachments for the presence of viruses. Lancaster County accepts no liability for any damage caused by any virus transmitted by this email. NOTICE: All email correspondence to and from this address may be subject to public disclosure under the SC Freedom of Information Act. From: Stephen Blackwelder <sblackwelder@lancastersc.net> Sent: Thursday, May 18, 2023 1:55 PM To: Chanda Kirkland <CKirkland@lancastersc.net> Subject: FW: Traffic Scoping for SC 160 and Barberville Road TIS Development You don't often get email from ckirkland@lancastersc.net. Learn why this is important Page 54 of 205 Page 55 of 205 Page 56 of 205 Page 57 of 205 Page 58 of 205 Page 59 of 205 Page 60 of 205 Page 61 of 205 Page 62 of 205 Page 63 of 205 Page 64 of 205 APPENDIX B Traffic Count Data Page 65 of 205 BARBERVILLE RD BARBERVILLE RDHARBOR BAY DRHARBOR BAY DR(303) 216-2439www.alltrafficdata.netLocation:1 BARBERVILLE RD & HARBOR BAY DR AMWednesday, May 3, 2023Date: Peak Rolling Hour Flow Rates Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - PedestriansTraffic Counts - Motorized VehiclesNote: Total study counts contained in parentheses.Peak Hour:07:30 AM - 08:30 AMPeak 15-Minutes:08:00 AM - 08:15 AM Heavy Vehicle Percentage and Peak Hour Factor 379 6670064138850150.97NSEW0.910.000.940.83(1,147)(684)()()(40)(101)(1,107)(705)10000001903100369563600HARBOR BAY DRHARBOR BAY DRBARBERVILLE RDBARBERVILLE RD 0000NSEW00000000 0000NSEW00000000LeftThruRightTotalEastboundIntervalStart TimeRollingHourWest East South NorthPedestrian CrossingsU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn7:00 AM 0 1 108 0 0 500 8 0 0 0 0 176 0 0 0 09207 0 0 27:15 AM 0 0 130 0 0 730 11 0 0 0 0 221 0 0 0 01,0193 0 0 47:30 AM 0 2 164 0 0 880 13 0 0 0 0 273 0 0 0 01,0703 0 0 37:45 AM 0 1 147 0 0 910 3 0 0 0 0 250 0 0 0 01,0195 0 0 38:00 AM 0 1 156 0 0 1030 7 0 0 0 0 275 0 0 0 09727 0 0 18:15 AM 0 1 169 0 0 870 8 0 0 0 0 272 0 0 0 04 0 0 38:30 AM 0 7 110 0 0 860 7 0 0 0 0 222 0 0 0 07 0 0 58:45 AM 0 4 106 0 0 830 0 0 0 0 0 203 0 0 0 08 0 0 2Vehicle TypeLeftThruRightEastboundU-TurnWestboundNorthboundSouthboundTotalLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-TurnArticulated Trucks 0 6 0 0 1 00 0 0 0 0 0 70 0 0 0Lights 5 621 0 0 354 1031 0 19 0 0 0 1,0400 0 0 0Mediums 0 9 0 0 14 00 0 0 0 0 0 230 0 0 0Total31 0 19 0 0 0 5 636 0 0 369 10 1,0700 0 0 0LeftThruRightTotalEastboundU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn0.0% 0.0% 0.9% 0.0% 0.0% 0.3%0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.7%0.0% 0.0% 0.0% 0.0%Heavy Vehicle %Heavy Vehicle %Peak Hour FactorPeak Hour Factor0.0% 0.0% 0.9% 0.3% 0.7%0.970.83 0.00 0.94 0.91 0.970.00 0.46 0.94 0.00 0.00 0.900.00 0.67 0.00 0.00 0.00 0.000.81 0.00 0.00 0.60 Page 66 of 205 BARBERVILLE RD STOCK LNSC 160SC 160(303) 216-2439www.alltrafficdata.netLocation:2 BARBERVILLE RD & SC 160 AMWednesday, May 3, 2023Date: Peak Rolling Hour Flow Rates Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - PedestriansTraffic Counts - Motorized VehiclesNote: Total study counts contained in parentheses.Peak Hour:07:30 AM - 08:30 AMPeak 15-Minutes:08:15 AM - 08:30 AM Heavy Vehicle Percentage and Peak Hour Factor 385 645685883001,2848260.97NSEW0.840.910.250.96(1,118)(702)(1,373)(1,594)(1,616)(2,253)(1)(1)2610124120565007595250000000SC 160SC 160BARBERVILLE RDSTOCK LN 0000NSEW00000000 0000NSEW00000000LeftThruRightTotalEastboundIntervalStart TimeRollingHourWest East South NorthPedestrian CrossingsU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn7:00 AM 0 0 0 0 12 00 84 107 0 0 126 398 0 0 0 02,0661 29 0 397:15 AM 0 1 0 0 23 00 112 137 0 0 153 506 0 0 0 02,2540 25 0 557:30 AM 0 0 0 0 29 00 141 169 0 0 137 568 0 0 0 02,3540 31 0 617:45 AM 0 0 0 0 36 00 111 206 0 0 156 594 0 0 0 02,3070 27 0 588:00 AM 0 0 0 0 40 00 140 183 0 0 124 586 0 0 0 02,2630 21 0 788:15 AM 0 0 0 0 19 00 133 201 0 0 148 606 0 0 0 00 41 0 648:30 AM 0 0 0 0 40 00 92 161 0 0 145 521 0 0 0 00 23 0 608:45 AM 0 0 0 0 29 00 73 202 0 0 152 550 0 0 0 00 35 0 59Vehicle TypeLeftThruRightEastboundU-TurnWestboundNorthboundSouthboundTotalLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-TurnArticulated Trucks 0 0 0 0 0 15 6 0 0 7 0 190 0 0 0Lights 0 0 0 118 0 252517 746 0 0 543 114 2,2900 0 0 0Mediums 0 0 0 6 0 83 7 0 0 15 6 450 0 0 0Total525 759 0 0 565 120 0 0 0 124 0 261 2,3540 0 0 0LeftThruRightTotalEastboundU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn0.0% 0.0% 0.0% 0.0% 0.0% 0.0%0.0% 1.0% 0.8% 0.0% 0.0% 1.2% 0.8%0.0% 0.0% 0.0% 0.4%Heavy Vehicle %Heavy Vehicle %Peak Hour FactorPeak Hour Factor0.9% 1.0% 0.0% 0.3% 0.8%0.970.96 0.91 0.25 0.84 0.970.00 0.25 0.00 0.00 0.84 0.000.00 0.93 0.92 0.00 0.00 0.920.25 0.73 0.00 0.84 Page 67 of 205 BARBERVILLE RD BARBERVILLE RDHARBOR BAY DRHARBOR BAY DR(303) 216-2439www.alltrafficdata.netLocation:1 BARBERVILLE RD & HARBOR BAY DR PMWednesday, May 3, 2023Date: Peak Rolling Hour Flow Rates Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - PedestriansTraffic Counts - Motorized VehiclesNote: Total study counts contained in parentheses.Peak Hour:05:00 PM - 06:00 PMPeak 15-Minutes:05:45 PM - 06:00 PM Heavy Vehicle Percentage and Peak Hour Factor 499 4890051151732360.88NSEW0.890.000.790.73(880)(940)()()(76)(56)(913)(953)50000022010004943147901HARBOR BAY DRHARBOR BAY DRBARBERVILLE RDBARBERVILLE RD 0000NSEW00000000 0000NSEW00000000LeftThruRightTotalEastboundIntervalStart TimeRollingHourWest East South NorthPedestrian CrossingsU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn4:00 PM 0 4 83 0 0 830 1 0 0 0 0 179 0 0 0 08674 0 0 44:15 PM 0 10 103 0 0 1140 3 0 0 0 0 239 0 0 0 09397 0 0 24:30 PM 0 4 98 0 0 840 4 0 0 0 0 200 0 0 0 09432 0 0 84:45 PM 0 2 98 0 0 1400 1 0 0 0 0 249 0 0 0 09962 0 0 65:00 PM 0 7 96 0 0 1370 3 0 0 0 0 251 0 0 0 01,0426 0 0 25:15 PM 0 8 115 0 0 1080 2 0 0 0 0 243 0 0 0 09 0 0 15:30 PM 1 7 116 0 0 1230 4 0 0 0 0 253 0 0 0 01 0 0 15:45 PM 0 9 152 0 0 1260 1 0 0 0 0 295 0 0 0 06 0 0 1Vehicle TypeLeftThruRightEastboundU-TurnWestboundNorthboundSouthboundTotalLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-TurnArticulated Trucks 0 1 0 0 2 00 0 0 0 0 0 30 0 0 0Lights 31 472 0 0 483 510 0 20 0 0 0 1,0220 0 1 0Mediums 0 6 0 0 9 00 0 2 0 0 0 170 0 0 0Total10 0 22 0 0 0 31 479 0 0 494 5 1,0420 0 1 0LeftThruRightTotalEastboundU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn0.0% 0.0% 0.2% 0.0% 0.0% 0.4%0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.3%0.0% 0.0% 0.0% 0.0%Heavy Vehicle %Heavy Vehicle %Peak Hour FactorPeak Hour Factor0.0% 0.0% 0.2% 0.4% 0.3%0.880.73 0.00 0.79 0.89 0.880.25 0.86 0.79 0.00 0.00 0.910.00 0.69 0.00 0.00 0.00 0.000.61 0.00 0.00 0.63 Page 68 of 205 BARBERVILLE RD STOCK LNSC 160SC 160(303) 216-2439www.alltrafficdata.netLocation:2 BARBERVILLE RD & SC 160 PMWednesday, May 3, 2023Date: Peak Rolling Hour Flow Rates Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - PedestriansTraffic Counts - Motorized VehiclesNote: Total study counts contained in parentheses.Peak Hour:05:00 PM - 06:00 PMPeak 15-Minutes:05:45 PM - 06:00 PM Heavy Vehicle Percentage and Peak Hour Factor 511 5148971,151101,0978410.95NSEW0.960.880.500.97(917)(951)(1,738)(2,006)(1,899)(2,131)(3)(1)1450366202695007853120001000SC 160SC 160BARBERVILLE RDSTOCK LN 0000NSEW00000000 0000NSEW00000000LeftThruRightTotalEastboundIntervalStart TimeRollingHourWest East South NorthPedestrian CrossingsU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn4:00 PM 0 1 0 0 23 00 71 178 0 0 166 535 0 0 0 02,3171 24 0 714:15 PM 0 0 1 0 22 00 70 193 0 0 196 597 0 0 0 02,3660 32 0 834:30 PM 0 0 0 0 30 00 78 180 0 0 157 551 0 0 0 02,4130 31 0 754:45 PM 0 0 0 0 31 00 65 198 0 0 204 634 0 0 0 02,4780 31 0 1055:00 PM 0 0 0 0 71 00 75 183 0 0 166 584 0 0 0 02,5060 35 0 545:15 PM 0 0 0 0 96 00 70 209 0 0 190 644 0 0 0 00 48 0 315:30 PM 0 1 0 0 104 00 84 194 0 0 158 616 0 0 0 00 45 0 305:45 PM 0 0 0 0 95 00 83 199 0 0 181 662 0 0 0 00 74 0 30Vehicle TypeLeftThruRightEastboundU-TurnWestboundNorthboundSouthboundTotalLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-TurnArticulated Trucks 0 0 0 1 0 11 3 0 0 4 0 100 0 0 0Lights 1 0 0 358 0 143308 775 0 0 687 200 2,4720 0 0 0Mediums 0 0 0 7 0 13 7 0 0 4 2 240 0 0 0Total312 785 0 0 695 202 1 0 0 366 0 145 2,5060 0 0 0LeftThruRightTotalEastboundU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn0.0% 0.0% 0.0% 0.0% 0.3% 0.0%0.0% 0.3% 0.4% 0.0% 0.0% 0.6% 0.4%0.0% 0.0% 0.0% 0.7%Heavy Vehicle %Heavy Vehicle %Peak Hour FactorPeak Hour Factor0.4% 0.4% 0.0% 0.4% 0.4%0.950.97 0.88 0.50 0.96 0.950.00 0.25 0.25 0.00 0.88 0.000.00 0.93 0.94 0.00 0.00 0.890.25 0.68 0.00 0.80 Page 69 of 205 APPENDIX C Traffic Volume Development Worksheets and ITE Trip Generation Worksheets Page 70 of 205 TRAFFIC CONTROL: DATE COUNTED: EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 525 759 0 0 565 120 0 0 0 124 0 261 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 3 3 3 3 3 3 3 3 3 3 3 3 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 16 23 0 0 17 4 0 0 0 4 0 8 0 13 38 13 4 0 10 8 8 29 1 1 3 3 4 2 6 11 7 3 10 20 26 13 22 39 51 27 31 63 573 821 0 0 633 159 0 0 0 167 0 361 50% 20% 20% 50% 41 16 12 31 41 16 12 31 614 821 0 0 633 175 0 0 0 179 0 392 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 312 785 0 0 695 202 1 0 0 366 0 145 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 3 3 3 3 3 3 3 3 3 3 3 3 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 9 24 0 0 21 6 0 0 0 11 0 4 0 39 24 8 13 0 32 3 5 19 3 3 1 2 13 6 4 7 23 11 7 12 17 9 71 56 33 31 30 40 424 865 0 0 749 242 1 0 0 412 0 208 50% 20% 20% 50% 53 20 23 58 53 20 23 58 477 865 0 0 749 262 1 0 0 435 0 266 Vested Trips (Redwood) Vested Trips (Pettus Pond) Vested Trips (The Lodges) Vested Trips (The Lodges) Inbound Trip Distribution Percentage Outbound Trip Distribution Percentage PM PEAK HOUR (5:00-6:00 PM) 2023 TRAFFIC VOLUMES Vested Trips (Patterson Lane Appartments) Years To Buildout (2026) Yearly Growth Rate Background Traffic Growth Vested Trips (Sugar Creek) Vested Trips (Patterson Preserve) Heavy Vehicle Percentage 2026 NO-BUILD TRAFFIC VOLUMES Inbound New Project Traffic Outbound New Project Traffic Total New Project Traffic 2026 BUILD TRAFFIC VOLUMES Inbound Trip Distribution Percentage Outbound Trip Distribution Percentage Pass-By Project Traffic Background Traffic Growth Vested Trips (Patterson Preserve) Vested Trips (Patterson Lane Appartments) Vested Traffic Volumes Vested Trips (Sugar Creek) Vested Trips (Redwood) Vested Trips (Pettus Pond) INTERSECTION TRAFFIC VOLUME DEVELOPMENT Fort Mill Highway & Barberville Road Signalized Wednesday, May 3, 2023 AM PEAK HOUR (7:30-8:30 AM) Total New Project Traffic Pass-by Project Traffic 2026 BUILD TRAFFIC VOLUMES Vested Traffic Volumes 2026 NO-BUILD TRAFFIC VOLUMES Inbound New Project Traffic Outbound New Project Traffic Yearly Growth Rate Years To Buildout (2026) 2023 TRAFFIC VOLUMES Heavy Vehicle Percentage Page 71 of 205 TRAFFIC CONTROL: DATE COUNTED: EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 31 0 19 0 0 0 5 636 0 0 369 10 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 3 3 3 3 3 3 3 3 3 3 3 3 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1 0 1 0 0 0 0 19 0 0 11 0 13 4 18 37 2 6 6 17 10 30 0 0 49 94 32 0 20 0 0 0 5 722 0 0 511 10 30% 30% 25 18 18 25 32 0 20 0 0 0 5 740 0 0 536 10 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 10 0 22 0 0 0 32 479 0 0 494 5 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 3 3 3 3 3 3 3 3 3 3 3 3 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 0 0 1 0 0 0 1 14 0 0 15 0 8 13 35 24 6 3 19 11 34 19 0 0 102 70 10 0 23 0 0 0 33 630 0 0 603 5 30% 30% 32 35 35 32 10 0 23 0 0 0 33 665 0 0 635 5 Vested Trips (The Lodges) Vested Trips (The Lodges) INTERSECTION TRAFFIC VOLUME DEVELOPMENT Barberville Road & Harbor Bay Drive Unsignalized Wednesday, May 3, 2023 AM PEAK HOUR (7:30-8:30 AM) 2023 TRAFFIC VOLUMES Heavy Vehicle Percentage Years To Buildout (2026) Yearly Growth Rate Pass-By Project Traffic Background Traffic Growth Vested Trips (Sugar Creek) Vested Trips (Patterson Preserve) Vested Trips (Patterson Lane Appartments) Vested Traffic Volumes 2026 NO-BUILD TRAFFIC VOLUMES Inbound Trip Distribution Percentage Outbound Trip Distribution Percentage Inbound New Project Traffic Outbound New Project Traffic Vested Trips (Redwood) Vested Trips (Pettus Pond) Total New Project Traffic 2026 BUILD TRAFFIC VOLUMES PM PEAK HOUR (5:00-6:00 PM) 2023 TRAFFIC VOLUMES Background Traffic Growth Heavy Vehicle Percentage Years To Buildout (2026) Yearly Growth Rate 2026 BUILD TRAFFIC VOLUMES Vested Trips (Sugar Creek) Vested Trips (Patterson Preserve) Vested Trips (Patterson Lane Appartments) Vested Traffic Volumes 2026 NO-BUILD TRAFFIC VOLUMES Inbound Trip Distribution Percentage Outbound Trip Distribution Percentage Inbound New Project Traffic Outbound New Project Traffic Pass-by Project Traffic Total New Project Traffic Vested Trips (Redwood) Vested Trips (Pettus Pond) Page 72 of 205 TRAFFIC CONTROL: DATE COUNTED: EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 0 0 0 0 0 0 641 0 0 388 0 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 3 3 3 3 3 3 3 3 3 3 3 3 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 0 0 0 0 0 0 0 19 0 0 12 0 13 4 18 37 2 6 6 17 10 30 0 0 49 94 0 0 0 0 0 0 0 727 0 0 531 0 70% 30% 30% 70% 57 25 18 43 18 43 57 25 18 0 43 0 0 0 57 727 0 0 531 25 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 0 0 0 0 0 0 511 0 0 516 0 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 3 3 3 3 3 3 3 3 3 3 3 3 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 0 0 0 0 0 0 0 15 0 0 15 0 8 13 35 24 6 3 19 11 34 19 0 0 102 70 0 0 0 0 0 0 0 663 0 0 625 0 70% 30% 30% 70% 73 32 35 81 35 81 73 32 35 0 81 0 0 0 73 663 0 0 625 32 Vested Trips (The Lodges) Vested Trips (The Lodges) INTERSECTION TRAFFIC VOLUME DEVELOPMENT Barberville Road & Fortson Road/ Site Access Unsignalized AM PEAK HOUR (7:30-8:30 AM) 2023 TRAFFIC VOLUMES Heavy Vehicle Percentage Years To Buildout (2026) Yearly Growth Rate Pass-By Project Traffic Background Traffic Growth Vested Trips (Sugar Creek) Vested Trips (Patterson Preserve) Vested Trips (Patterson Lane Appartments) Vested Traffic Volumes 2026 NO-BUILD TRAFFIC VOLUMES Inbound Trip Distribution Percentage Outbound Trip Distribution Percentage Inbound New Project Traffic Outbound New Project Traffic Vested Trips (Redwood) Vested Trips (Pettus Pond) Total New Project Traffic 2026 BUILD TRAFFIC VOLUMES PM PEAK HOUR (5:00-6:00 PM) 2023 TRAFFIC VOLUMES Background Traffic Growth Heavy Vehicle Percentage Years To Buildout (2026) Yearly Growth Rate 2026 BUILD TRAFFIC VOLUMES Vested Trips (Sugar Creek) Vested Trips (Patterson Preserve) Vested Trips (Patterson Lane Appartments) Vested Traffic Volumes 2026 NO-BUILD TRAFFIC VOLUMES Inbound Trip Distribution Percentage Outbound Trip Distribution Percentage Inbound New Project Traffic Outbound New Project Traffic Pass-by Project Traffic Total New Project Traffic Vested Trips (Redwood) Vested Trips (Pettus Pond) Page 73 of 205 Page 74 of 205 Page 75 of 205 Page 76 of 205 Page 77 of 205 Page 78 of 205 Page 79 of 205 Page 80 of 205 Page 81 of 205 Page 82 of 205 APPENDIX D Turn Lane Analysis Worksheets Page 83 of 205 INTERSECTION: Barberville Road & Site Access MOVEMENT: Northbound left turn SCENARIO Advancing Volume (Va) Northbound left turn Opposing Volume (Vo) Left Turn % of Va Symbol AM Build 784 57 556 7.3% PM Build 736 73 657 9.9% . Barberville Road TIS LEFT-TURN LANE WARRANT REVIEW AM BuildPM Build ` ` Page 84 of 205 INTERSECTION: Barberville Road & Site Access MOVEMENT: Southbound right turn SCENARIO Design Hour Volume Right Turn Volume Symbol AM Build 556 25 PM Build 657 32 Barberville Road TIS RIGHT-TURN LANE WARRANT REVIEW ` AMBuildPMBuild Page 85 of 205 APPENDIX E Capacity Analysis Page 86 of 205 2023 Existing Conditions Page 87 of 205 HCM 6th Signalized Intersection Summary Barberville Road TIS 100: Fort Mill Highway & Barberville Road 2023 Existing AM RKA Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 525 759 0 0 565 120 0 0 0 124 0 261 Future Volume (veh/h) 525 759 0 0 565 120 0 0 0 124 0 261 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847 Adj Flow Rate, veh/h 571 825 0 0 614 130 0 0 0 135 0 284 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 540 1367 0 0 763 918 0 2 0 316 0 282 Arrive On Green 0.18 0.67 0.00 0.00 0.43 0.43 0.00 0.00 0.00 0.18 0.00 0.18 Sat Flow, veh/h 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565 Grp Volume(v), veh/h 571 825 0 0 614 130 0 0 0 135 0 284 Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565 Q Serve(g_s), s 14.9 18.3 0.0 0.0 24.6 3.0 0.0 0.0 0.0 5.6 0.0 14.7 Cycle Q Clear(g_c), s 14.9 18.3 0.0 0.0 24.6 3.0 0.0 0.0 0.0 5.6 0.0 14.7 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 540 1367 0 0 763 918 0 2 0 316 0 282 V/C Ratio(X) 1.06 0.60 0.00 0.00 0.80 0.14 0.00 0.00 0.00 0.43 0.00 1.01 Avail Cap(c_a), veh/h 540 1697 0 0 1052 1162 0 470 0 316 0 282 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 19.5 7.3 0.0 0.0 20.3 6.8 0.0 0.0 0.0 29.8 0.0 33.5 Incr Delay (d2), s/veh 54.9 0.3 0.0 0.0 2.8 0.1 0.0 0.0 0.0 0.9 0.0 55.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 13.6 5.4 0.0 0.0 9.4 1.3 0.0 0.0 0.0 2.3 0.0 9.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 74.4 7.6 0.0 0.0 23.1 6.9 0.0 0.0 0.0 30.7 0.0 89.3 LnGrp LOS F A A A C A A A A C A F Approach Vol, veh/h 1396 744 0 419 Approach Delay, s/veh 34.9 20.3 0.0 70.4 Approach LOS C C E Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 61.7 0.0 20.0 41.7 20.0 Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3 Max Green Setting (Gmax), s * 68 * 20 14.9 * 48 14.7 Max Q Clear Time (g_c+I1), s 20.3 0.0 16.9 26.6 16.7 Green Ext Time (p_c), s 21.2 0.0 0.0 8.5 0.0 Intersection Summary HCM 6th Ctrl Delay 36.5 HCM 6th LOS D Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Page 88 of 205 HCM 6th TWSC Barberville Road TIS 200: Barberville Road & Harbor Bay Drive 2023 Existing AM RKA Synchro 11 Report Intersection Int Delay, s/veh 1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 31 19 5 636 369 10 Future Vol, veh/h 31 19 5 636 369 10 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 34 21 5 691 401 11 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1108 407 412 0 - 0 Stage 1 407 - - - - - Stage 2 701 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 232 644 1147 - - - Stage 1 672 - - - - - Stage 2 492 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 230 644 1147 - - - Mov Cap-2 Maneuver 230 - - - - - Stage 1 667 - - - - - Stage 2 492 - - - - - Approach EB NB SB HCM Control Delay, s 19.4 0.1 0 HCM LOS C Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1147 - 304 - - HCM Lane V/C Ratio 0.005 - 0.179 - - HCM Control Delay (s) 8.2 0 19.4 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0 - 0.6 - - Page 89 of 205 HCM 6th Signalized Intersection Summary Barberville Road TIS 100: Fort Mill Highway & Barberville Road 2023 Existing PM RKA Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 312 785 0 0 695 202 1 0 0 366 0 145 Future Volume (veh/h) 312 785 0 0 695 202 1 0 0 366 0 145 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847 Adj Flow Rate, veh/h 339 853 0 0 755 220 1 0 0 398 0 158 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 381 1335 0 0 843 950 4 0 0 275 0 245 Arrive On Green 0.13 0.66 0.00 0.00 0.47 0.47 0.00 0.00 0.00 0.16 0.00 0.16 Sat Flow, veh/h 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565 Grp Volume(v), veh/h 339 853 0 0 755 220 1 0 0 398 0 158 Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565 Q Serve(g_s), s 9.7 23.3 0.0 0.0 36.5 5.9 0.1 0.0 0.0 14.7 0.0 8.9 Cycle Q Clear(g_c), s 9.7 23.3 0.0 0.0 36.5 5.9 0.1 0.0 0.0 14.7 0.0 8.9 Prop In Lane 1.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 381 1335 0 0 843 950 4 0 0 275 0 245 V/C Ratio(X) 0.89 0.64 0.00 0.00 0.90 0.23 0.25 0.00 0.00 1.45 0.00 0.65 Avail Cap(c_a), veh/h 436 1474 0 0 914 1009 389 0 0 275 0 245 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 23.8 9.5 0.0 0.0 22.6 7.5 46.9 0.0 0.0 39.7 0.0 37.3 Incr Delay (d2), s/veh 18.1 0.7 0.0 0.0 10.6 0.1 28.7 0.0 0.0 221.0 0.0 5.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.7 8.2 0.0 0.0 15.9 2.6 0.1 0.0 0.0 23.0 0.0 3.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 41.9 10.2 0.0 0.0 33.2 7.6 75.5 0.0 0.0 260.7 0.0 43.0 LnGrp LOS D B A A C A E A A F A D Approach Vol, veh/h 1192 975 1 556 Approach Delay, s/veh 19.2 27.4 75.5 198.9 Approach LOS B C E F Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 68.6 5.5 17.3 51.3 20.0 Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3 Max Green Setting (Gmax), s * 68 * 20 14.9 * 48 14.7 Max Q Clear Time (g_c+I1), s 25.3 2.1 11.7 38.5 16.7 Green Ext Time (p_c), s 21.2 0.0 0.5 6.1 0.0 Intersection Summary HCM 6th Ctrl Delay 58.8 HCM 6th LOS E Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Page 90 of 205 HCM 6th TWSC Barberville Road TIS 200: Barberville Road & Harbor Bay Drive 2023 Existing PM RKA Synchro 11 Report Intersection Int Delay, s/veh 0.7 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 10 22 32 479 494 5 Future Vol, veh/h 10 22 32 479 494 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 11 24 35 521 537 5 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1131 540 542 0 - 0 Stage 1 540 - - - - - Stage 2 591 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 225 542 1027 - - - Stage 1 584 - - - - - Stage 2 553 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 214 542 1027 - - - Mov Cap-2 Maneuver 214 - - - - - Stage 1 556 - - - - - Stage 2 553 - - - - - Approach EB NB SB HCM Control Delay, s 15.9 0.5 0 HCM LOS C Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1027 - 366 - - HCM Lane V/C Ratio 0.034 - 0.095 - - HCM Control Delay (s) 8.6 0 15.9 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0.1 - 0.3 - - Page 91 of 205 2026 No-Build Conditions Page 92 of 205 HCM 6th Signalized Intersection Summary Barberville Road TIS 100: Fort Mill Highway & Barberville Road 2026 No- Build AM RKA Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 573 821 0 0 633 159 0 0 0 167 0 361 Future Volume (veh/h) 573 821 0 0 633 159 0 0 0 167 0 361 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847 Adj Flow Rate, veh/h 623 892 0 0 688 173 0 0 0 182 0 392 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 525 1341 0 0 672 929 0 2 0 421 0 374 Arrive On Green 0.24 0.66 0.00 0.00 0.38 0.38 0.00 0.00 0.00 0.24 0.00 0.24 Sat Flow, veh/h 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565 Grp Volume(v), veh/h 623 892 0 0 688 173 0 0 0 182 0 392 Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565 Q Serve(g_s), s 28.9 31.9 0.0 0.0 45.4 6.0 0.0 0.0 0.0 10.5 0.0 28.7 Cycle Q Clear(g_c), s 28.9 31.9 0.0 0.0 45.4 6.0 0.0 0.0 0.0 10.5 0.0 28.7 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 525 1341 0 0 672 929 0 2 0 421 0 374 V/C Ratio(X) 1.19 0.66 0.00 0.00 1.02 0.19 0.00 0.00 0.00 0.43 0.00 1.05 Avail Cap(c_a), veh/h 525 1341 0 0 672 929 0 141 0 421 0 374 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 38.9 12.3 0.0 0.0 37.3 9.9 0.0 0.0 0.0 38.7 0.0 45.7 Incr Delay (d2), s/veh 102.0 2.6 0.0 0.0 40.9 0.4 0.0 0.0 0.0 0.7 0.0 59.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 29.0 13.3 0.0 0.0 26.2 3.5 0.0 0.0 0.0 4.5 0.0 17.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 140.9 14.9 0.0 0.0 78.2 10.4 0.0 0.0 0.0 39.4 0.0 105.1 LnGrp LOS F B A A F B A A A D A F Approach Vol, veh/h 1515 861 0 574 Approach Delay, s/veh 66.7 64.6 0.0 84.3 Approach LOS E E F Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 86.0 34.0 34.0 52.0 0.0 Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3 Max Green Setting (Gmax), s * 65 * 29 28.9 * 31 8.7 Max Q Clear Time (g_c+I1), s 33.9 30.7 30.9 47.4 0.0 Green Ext Time (p_c), s 18.7 0.0 0.0 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 69.5 HCM 6th LOS E Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Page 93 of 205 HCM 6th TWSC Barberville Road TIS 200: Barberville Road & Harbor Bay Drive 2026 No- Build AM RKA Synchro 11 Report Intersection Int Delay, s/veh 1.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 32 20 5 722 511 10 Future Vol, veh/h 32 20 5 722 511 10 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 35 22 5 785 555 11 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1356 561 566 0 - 0 Stage 1 561 - - - - - Stage 2 795 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 165 527 1006 - - - Stage 1 571 - - - - - Stage 2 445 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 164 527 1006 - - - Mov Cap-2 Maneuver 164 - - - - - Stage 1 566 - - - - - Stage 2 445 - - - - - Approach EB NB SB HCM Control Delay, s 26.5 0.1 0 HCM LOS D Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1006 - 223 - - HCM Lane V/C Ratio 0.005 - 0.253 - - HCM Control Delay (s) 8.6 0 26.5 - - HCM Lane LOS A A D - - HCM 95th %tile Q(veh) 0 - 1 - - Page 94 of 205 HCM 6th Signalized Intersection Summary Barberville Road TIS 100: Fort Mill Highway & Barberville Road 2026 No- Build PM RKA Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 424 865 0 0 749 242 1 0 0 412 0 208 Future Volume (veh/h) 424 865 0 0 749 242 1 0 0 412 0 208 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847 Adj Flow Rate, veh/h 461 940 0 0 814 263 1 0 0 448 0 226 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 493 1247 0 0 619 885 4 0 0 421 0 374 Arrive On Green 0.22 0.62 0.00 0.00 0.35 0.35 0.00 0.00 0.00 0.24 0.00 0.24 Sat Flow, veh/h 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565 Grp Volume(v), veh/h 461 940 0 0 814 263 1 0 0 448 0 226 Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565 Q Serve(g_s), s 24.3 39.9 0.0 0.0 41.8 10.5 0.1 0.0 0.0 28.7 0.0 15.4 Cycle Q Clear(g_c), s 24.3 39.9 0.0 0.0 41.8 10.5 0.1 0.0 0.0 28.7 0.0 15.4 Prop In Lane 1.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 493 1247 0 0 619 885 4 0 0 421 0 374 V/C Ratio(X) 0.93 0.75 0.00 0.00 1.32 0.30 0.25 0.00 0.00 1.06 0.00 0.60 Avail Cap(c_a), veh/h 525 1247 0 0 619 885 135 0 0 421 0 374 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 37.5 16.6 0.0 0.0 39.1 12.4 59.8 0.0 0.0 45.7 0.0 40.6 Incr Delay (d2), s/veh 23.5 4.2 0.0 0.0 153.1 0.9 28.9 0.0 0.0 62.2 0.0 2.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 16.1 17.7 0.0 0.0 43.5 6.0 0.1 0.0 0.0 19.4 0.0 6.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 61.0 20.8 0.0 0.0 192.1 13.2 88.7 0.0 0.0 107.9 0.0 43.3 LnGrp LOS E C A A F B F A A F A D Approach Vol, veh/h 1401 1077 1 674 Approach Delay, s/veh 34.0 148.5 88.7 86.2 Approach LOS C F F F Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 80.4 34.0 32.0 48.4 5.6 Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3 Max Green Setting (Gmax), s * 65 * 29 28.9 * 31 8.7 Max Q Clear Time (g_c+I1), s 41.9 30.7 26.3 43.8 2.1 Green Ext Time (p_c), s 16.2 0.0 0.6 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 84.3 HCM 6th LOS F Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Page 95 of 205 HCM 6th TWSC Barberville Road TIS 200: Barberville Road & Harbor Bay Drive 2026 No- Build PM RKA Synchro 11 Report Intersection Int Delay, s/veh 0.7 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 10 23 33 630 603 5 Future Vol, veh/h 10 23 33 630 603 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 11 25 36 685 655 5 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1415 658 660 0 - 0 Stage 1 658 - - - - - Stage 2 757 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 151 464 928 - - - Stage 1 515 - - - - - Stage 2 463 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 141 464 928 - - - Mov Cap-2 Maneuver 141 - - - - - Stage 1 483 - - - - - Stage 2 463 - - - - - Approach EB NB SB HCM Control Delay, s 20.1 0.4 0 HCM LOS C Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 928 - 274 - - HCM Lane V/C Ratio 0.039 - 0.131 - - HCM Control Delay (s) 9 0 20.1 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0.1 - 0.4 - - Page 96 of 205 2026 Build Conditions Page 97 of 205 HCM 6th Signalized Intersection Summary Barberville Road TIS 100: Fort Mill Highway & Barberville Road 2026 Build AM RKA Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 582 782 0 0 582 140 0 0 0 140 0 300 Future Volume (veh/h) 582 782 0 0 582 140 0 0 0 140 0 300 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847 Adj Flow Rate, veh/h 633 850 0 0 633 152 0 0 0 152 0 326 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 520 1324 0 0 691 586 0 439 0 469 0 353 Arrive On Green 0.21 0.65 0.00 0.00 0.39 0.39 0.00 0.00 0.00 0.23 0.00 0.23 Sat Flow, veh/h 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565 Grp Volume(v), veh/h 633 850 0 0 633 152 0 0 0 152 0 326 Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565 Q Serve(g_s), s 20.9 24.7 0.0 0.0 33.3 6.8 0.0 0.0 0.0 7.2 0.0 20.1 Cycle Q Clear(g_c), s 20.9 24.7 0.0 0.0 33.3 6.8 0.0 0.0 0.0 7.2 0.0 20.1 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 520 1324 0 0 691 586 0 439 0 469 0 353 V/C Ratio(X) 1.22 0.64 0.00 0.00 0.92 0.26 0.00 0.00 0.00 0.32 0.00 0.92 Avail Cap(c_a), veh/h 520 1366 0 0 728 617 0 439 0 478 0 360 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 28.5 10.2 0.0 0.0 28.6 20.5 0.0 0.0 0.0 32.4 0.0 37.4 Incr Delay (d2), s/veh 114.0 0.9 0.0 0.0 15.7 0.2 0.0 0.0 0.0 0.4 0.0 28.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 28.2 9.1 0.0 0.0 16.0 2.3 0.0 0.0 0.0 3.0 0.0 10.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 142.4 11.1 0.0 0.0 44.2 20.6 0.0 0.0 0.0 32.8 0.0 66.1 LnGrp LOS F B A A D C A A A C A E Approach Vol, veh/h 1483 785 0 478 Approach Delay, s/veh 67.2 39.7 0.0 55.5 Approach LOS E D E Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 71.0 27.6 26.0 45.0 27.6 Change Period (Y+Rc), s * 6.6 * 5.4 5.1 * 6.6 5.4 Max Green Setting (Gmax), s * 66 * 23 20.9 * 40 8.6 Max Q Clear Time (g_c+I1), s 26.7 22.1 22.9 35.3 0.0 Green Ext Time (p_c), s 20.2 0.1 0.0 3.0 0.0 Intersection Summary HCM 6th Ctrl Delay 57.3 HCM 6th LOS E Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Page 98 of 205 HCM 6th TWSC Barberville Road TIS 200: Barberville Road & Harbor Bay Drive 2026 Build AM RKA Synchro 11 Report Intersection Int Delay, s/veh 1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 32 20 5 673 405 10 Future Vol, veh/h 32 20 5 673 405 10 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 35 22 5 732 440 11 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1188 446 451 0 - 0 Stage 1 446 - - - - - Stage 2 742 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 208 612 1109 - - - Stage 1 645 - - - - - Stage 2 471 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 206 612 1109 - - - Mov Cap-2 Maneuver 206 - - - - - Stage 1 640 - - - - - Stage 2 471 - - - - - Approach EB NB SB HCM Control Delay, s 21.3 0.1 0 HCM LOS C Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1109 - 277 - - HCM Lane V/C Ratio 0.005 - 0.204 - - HCM Control Delay (s) 8.3 0 21.3 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0 - 0.7 - - Page 99 of 205 HCM 6th TWSC Barberville Road TIS 300: Barberville Road & Site Access 2026 Build AM RKA Synchro 11 Report Intersection Int Delay, s/veh 1.3 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 18 43 57 714 527 25 Future Vol, veh/h 18 43 57 714 527 25 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 50 0 150 - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 20 47 62 776 573 27 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1487 587 600 0 - 0 Stage 1 587 - - - - - Stage 2 900 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 137 510 977 - - - Stage 1 556 - - - - - Stage 2 397 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 128 510 977 - - - Mov Cap-2 Maneuver 128 - - - - - Stage 1 521 - - - - - Stage 2 397 - - - - - Approach EB NB SB HCM Control Delay, s 20.3 0.7 0 HCM LOS C Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR Capacity (veh/h) 977 - 128 510 - - HCM Lane V/C Ratio 0.063 - 0.153 0.092 - - HCM Control Delay (s) 8.9 - 38.1 12.8 - - HCM Lane LOS A - E B - - HCM 95th %tile Q(veh) 0.2 - 0.5 0.3 - - Page 100 of 205 HCM 6th Signalized Intersection Summary Barberville Road TIS 100: Fort Mill Highway & Barberville Road 2026 Build PM RKA Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 477 865 0 0 749 262 1 0 0 435 0 266 Future Volume (veh/h) 477 865 0 0 749 262 1 0 0 435 0 266 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847 Adj Flow Rate, veh/h 518 940 0 0 814 285 1 0 0 473 0 289 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 525 1247 0 0 590 860 4 0 0 421 0 374 Arrive On Green 0.24 0.62 0.00 0.00 0.33 0.33 0.00 0.00 0.00 0.24 0.00 0.24 Sat Flow, veh/h 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565 Grp Volume(v), veh/h 518 940 0 0 814 285 1 0 0 473 0 289 Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565 Q Serve(g_s), s 28.3 39.9 0.0 0.0 39.8 12.0 0.1 0.0 0.0 28.7 0.0 20.7 Cycle Q Clear(g_c), s 28.3 39.9 0.0 0.0 39.8 12.0 0.1 0.0 0.0 28.7 0.0 20.7 Prop In Lane 1.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 525 1247 0 0 590 860 4 0 0 421 0 374 V/C Ratio(X) 0.99 0.75 0.00 0.00 1.38 0.33 0.25 0.00 0.00 1.12 0.00 0.77 Avail Cap(c_a), veh/h 525 1247 0 0 590 860 135 0 0 421 0 374 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 38.0 16.6 0.0 0.0 40.1 13.6 59.8 0.0 0.0 45.7 0.0 42.6 Incr Delay (d2), s/veh 35.7 4.2 0.0 0.0 181.7 1.0 28.9 0.0 0.0 82.3 0.0 9.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 19.9 17.7 0.0 0.0 46.2 6.8 0.1 0.0 0.0 21.8 0.0 8.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 73.7 20.8 0.0 0.0 221.7 14.6 88.7 0.0 0.0 127.9 0.0 52.2 LnGrp LOS E C A A F B F A A F A D Approach Vol, veh/h 1458 1099 1 762 Approach Delay, s/veh 39.6 168.0 88.7 99.2 Approach LOS D F F F Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 80.4 34.0 34.0 46.4 5.6 Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3 Max Green Setting (Gmax), s * 65 * 29 28.9 * 31 8.7 Max Q Clear Time (g_c+I1), s 41.9 30.7 30.3 41.8 2.1 Green Ext Time (p_c), s 16.2 0.0 0.0 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 95.8 HCM 6th LOS F Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Page 101 of 205 HCM 6th TWSC Barberville Road TIS 200: Barberville Road & Harbor Bay Drive 2026 Build PM RKA Synchro 11 Report Intersection Int Delay, s/veh 0.7 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 10 23 33 665 635 5 Future Vol, veh/h 10 23 33 665 635 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 11 25 36 723 690 5 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1488 693 695 0 - 0 Stage 1 693 - - - - - Stage 2 795 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 137 443 901 - - - Stage 1 496 - - - - - Stage 2 445 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 128 443 901 - - - Mov Cap-2 Maneuver 128 - - - - - Stage 1 463 - - - - - Stage 2 445 - - - - - Approach EB NB SB HCM Control Delay, s 21.5 0.4 0 HCM LOS C Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 901 - 254 - - HCM Lane V/C Ratio 0.04 - 0.141 - - HCM Control Delay (s) 9.2 0 21.5 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0.1 - 0.5 - - Page 102 of 205 HCM 6th TWSC Barberville Road TIS 300: Barberville Road & Site Access 2026 Build PM RKA Synchro 11 Report Intersection Int Delay, s/veh 2.5 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 35 81 73 663 625 32 Future Vol, veh/h 35 81 73 663 625 32 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 50 0 150 - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 38 88 79 721 679 35 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1576 697 714 0 - 0 Stage 1 697 - - - - - Stage 2 879 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 121 441 886 - - - Stage 1 494 - - - - - Stage 2 406 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 110 441 886 - - - Mov Cap-2 Maneuver 110 - - - - - Stage 1 450 - - - - - Stage 2 406 - - - - - Approach EB NB SB HCM Control Delay, s 26.9 0.9 0 HCM LOS D Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR Capacity (veh/h) 886 - 110 441 - - HCM Lane V/C Ratio 0.09 - 0.346 0.2 - - HCM Control Delay (s) 9.5 - 54.1 15.2 - - HCM Lane LOS A - F C - - HCM 95th %tile Q(veh) 0.3 - 1.4 0.7 - - Page 103 of 205 HCM 6th Signalized Intersection Summary Barberville Road TIS 100: Fort Mill Highway & Barberville Road 2026 Build Improved AM RKA Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 614 821 0 0 633 175 0 0 0 179 0 392 Future Volume (veh/h) 614 821 0 0 633 175 0 0 0 179 0 392 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847 Adj Flow Rate, veh/h 667 892 0 0 688 190 0 0 0 195 0 426 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 654 2452 0 0 1192 929 0 2 0 465 0 413 Arrive On Green 0.24 0.64 0.00 0.00 0.35 0.35 0.00 0.00 0.00 0.26 0.00 0.26 Sat Flow, veh/h 1931 3953 0 0 3463 1505 0 1949 0 1759 0 1565 Grp Volume(v), veh/h 667 892 0 0 688 190 0 0 0 195 0 426 Grp Sat Flow(s),veh/h/ln 1931 1926 0 0 1687 1505 0 1949 0 1759 0 1565 Q Serve(g_s), s 28.9 13.1 0.0 0.0 19.9 6.6 0.0 0.0 0.0 11.0 0.0 31.7 Cycle Q Clear(g_c), s 28.9 13.1 0.0 0.0 19.9 6.6 0.0 0.0 0.0 11.0 0.0 31.7 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 654 2452 0 0 1192 929 0 2 0 465 0 413 V/C Ratio(X) 1.02 0.36 0.00 0.00 0.58 0.20 0.00 0.00 0.00 0.42 0.00 1.03 Avail Cap(c_a), veh/h 654 2452 0 0 1192 929 0 141 0 465 0 413 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 25.7 10.3 0.0 0.0 31.5 10.0 0.0 0.0 0.0 36.5 0.0 44.2 Incr Delay (d2), s/veh 40.5 0.4 0.0 0.0 2.0 0.5 0.0 0.0 0.0 0.6 0.0 52.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 16.6 5.1 0.0 0.0 8.1 4.0 0.0 0.0 0.0 4.7 0.0 17.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 66.2 10.7 0.0 0.0 33.6 10.5 0.0 0.0 0.0 37.1 0.0 96.4 LnGrp LOS F B A A C B A A A D A F Approach Vol, veh/h 1559 878 0 621 Approach Delay, s/veh 34.5 28.6 0.0 77.8 Approach LOS C C E Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 83.0 37.0 34.0 49.0 0.0 Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3 Max Green Setting (Gmax), s * 62 * 32 28.9 * 28 8.7 Max Q Clear Time (g_c+I1), s 15.1 33.7 30.9 21.9 0.0 Green Ext Time (p_c), s 20.1 0.0 0.0 3.8 0.0 Intersection Summary HCM 6th Ctrl Delay 41.6 HCM 6th LOS D Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Page 104 of 205 HCM 6th Signalized Intersection Summary Barberville Road TIS 100: Fort Mill Highway & Barberville Road 2026 Build Improved PM RKA Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 477 865 0 0 749 262 1 0 0 435 0 266 Future Volume (veh/h) 477 865 0 0 749 262 1 0 0 435 0 266 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847 Adj Flow Rate, veh/h 518 940 0 0 814 285 1 0 0 473 0 289 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 551 2274 0 0 1098 887 4 0 0 465 0 413 Arrive On Green 0.22 0.59 0.00 0.00 0.33 0.33 0.00 0.00 0.00 0.26 0.00 0.26 Sat Flow, veh/h 1931 3953 0 0 3463 1505 1856 0 0 1759 0 1565 Grp Volume(v), veh/h 518 940 0 0 814 285 1 0 0 473 0 289 Grp Sat Flow(s),veh/h/ln 1931 1926 0 0 1687 1505 1856 0 0 1759 0 1565 Q Serve(g_s), s 23.9 15.9 0.0 0.0 25.7 11.5 0.1 0.0 0.0 31.7 0.0 20.0 Cycle Q Clear(g_c), s 23.9 15.9 0.0 0.0 25.7 11.5 0.1 0.0 0.0 31.7 0.0 20.0 Prop In Lane 1.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 551 2274 0 0 1098 887 4 0 0 465 0 413 V/C Ratio(X) 0.94 0.41 0.00 0.00 0.74 0.32 0.25 0.00 0.00 1.02 0.00 0.70 Avail Cap(c_a), veh/h 587 2274 0 0 1098 887 135 0 0 465 0 413 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 29.7 13.3 0.0 0.0 36.0 12.5 59.8 0.0 0.0 44.2 0.0 39.8 Incr Delay (d2), s/veh 22.7 0.6 0.0 0.0 4.5 1.0 28.9 0.0 0.0 46.4 0.0 5.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 17.8 6.5 0.0 0.0 10.8 6.9 0.1 0.0 0.0 19.3 0.0 8.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 52.3 13.9 0.0 0.0 40.5 13.4 88.7 0.0 0.0 90.5 0.0 45.0 LnGrp LOS D B A A D B F A A F A D Approach Vol, veh/h 1458 1099 1 762 Approach Delay, s/veh 27.5 33.5 88.7 73.3 Approach LOS C C F E Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 77.4 37.0 31.8 45.6 5.6 Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3 Max Green Setting (Gmax), s * 62 * 32 28.9 * 28 8.7 Max Q Clear Time (g_c+I1), s 17.9 33.7 25.9 27.7 2.1 Green Ext Time (p_c), s 21.0 0.0 0.8 0.5 0.0 Intersection Summary HCM 6th Ctrl Delay 40.0 HCM 6th LOS D Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Page 105 of 205 Traffic Impact Analysis Review – Barberville Road Development Technical Memorandum May 30, 2024 Eric Dillon 1Page | 2 1. Overview of Traffic Impact Analysis (TIA) Report Ramey Kemp submitted a traffic impact analysis report for a mixed-use development fronting Barberville Road at SC 150 in Lancaster County. The report was labeled draft and not signed, and no Engineer on Record (EOR) was verified for this traffic study. Fort Mill Highway (SC 160) at Barberville Road/Stock Lane and Barberville Road at Harbor Bay Drive and one site access across from Fortson Road was analyzed in this report. The proposed access is approximately 670’ north of Fort Mill Highway that lines up with Fortson Road. The site plan in the report showed a mixed use of three parcels that included a day care, strip retail, and small office building. However, there was a plat that was not included in the traffic study that showed eight parcels in addition to the existing cell tower on the property. The report contained existing, no-build, and build traffic volumes for all study locations and with good distribution among all points. There was background development traffic added to the final build models from other approved developments in the area. The analysis final year was determined to be 2026 in the report which is assumed build +1 year for Lancaster County UDO compliance since this is a small development. 2. Items of Interest in the TIA Report The TIA document was redlined with marks highlighting discrepancies/interest items below (pages noted below reflect pdf pages and not report pages): Cover Page – No PE signature and no EOR labeled. Page 6 – Analysis year 2026 does not state that the build year is 2025 which could be assumed due to the small size of the development which could be completed next year. Page 8 – Site plan in study shows 3 parcels with existing cell tower which the analysis was done for. A plat received by Lancaster County shows 8 parcels. Page 9 – Traffic counts are a year old – study must have been delayed in submitting. Page 16 – Growth rate showed only 1% based on 3 years of SCDOT count station data. Should use 5 – 10 years to get a more accurate rate. However, a significant amount of background traffic was established based on previous approved developments. Page 70 – Should utilize Peak Hour Factor (PHF) from traffic counts and not Synchro defaults at PHF = .92. SCDOT default is PHF = .90. Page 70 - Volumes utilized in AM Build Synchro do not match AM Build volumes in Figure 8 in the report. Need to show additional reports to reflect Queuing southbound on Barberville Road at Fort Mill Highway. Micro analysis would be good to determine if queues could possibly reach the proposed access at build out. Page 73 – Major delay for WB traffic on Fort Mill Highway during PM peak which is also shown in the No-Build scenario. 3. Checklist Comments An accompanying TIA checklist that reviews all submitted information for proper TIA submittal. Main items are the site plan and separate plat discrepancies. Site engineer needs to verify sight distance for access. Page 106 of 205 Traffic Impact Analysis Review – Barberville Road Development Technical Memorandum May 30, 2024 Eric Dillon 2Page | 2 4. Recommendations/Action Items Action items are as follows: If future development causes additional parcels to be developed other than those presented in this study; a new traffic impact study will be required. Verify sight distance for the access point. Traffic study needs to be reviewed and corrected by EOR and signed and stamped by the EOR. Conduct a queue analysis for the Barberville Road SB movement at Fort Hill Highway to determine any impediment to the proposed access. Install left turn lane on Barberville Road as recommended by extending the 3-lane section from Fort Mill Highway. Page 107 of 205 1 | P a g e November 21, 2024 Reference : Barberville Road Development – Lancaster County Response to TIA Comments The following provides a response to TIA review comments received from the County on November 18, 2024, for the Barberville Road Development. 1. Analysis year 2026 does not state the build year is 2025. Which could be assumed due to the small size of the development which could be completed next year. • The anticipated build year is 2025. Analysis year 2026 represents a 2025 build year +1, consistent with Lancaster UDO. 2. The site plan in study shows 3 parcels with existing cell tower which the analysis was done for. A plat received by Lancaster County shows 8 parcels. • The updated site plan shows Parcels 1, 2, 3, and 8, with one (1) access point from Barberville Road serving the site . Additional parcels or modifications to access would warrant further discussion and potentially require an update to the traffic study. 3. Traffic counts are a year old. • Acknowledged, the traffic counts were conducted when the study was originally completed. A series of delays in processing the application have led to a longer review period. 4. Should utilize Peak Hour Factor (PHF) from traffic counts and not Synchro defaults at PHF =.92. SCDOT default is PHF = .90. • The peak hour factors were conservatively updated to the SCDOT default of 0.90. 5. Volumes utilized in AM build Synchro do not match AM Build volumes in figure 8 in the report. Need to show additional reports to reflect queueing southbound on Barberville Road at Fort Mill Highway. • Volumes were corrected to match Figure 8 in the AM Build scenario. The queueing reports have been provided in the updated study for reference. 6. Major delay for the westbound traffic on Fort Mill Highway during PM peak which is also shown in the No-Build scenario. • Acknowledged, the delays occur under future conditions both with and without the subject site. SCDOT has accepted t he proposed left-turn lane improvement mitigate s the subject properties potential future impacts at the site driveway and would not require further analysis. Page 108 of 205 Lancaster County Planning Department P. O. Box 1809 Lancaster, SC 29721 803.285.6005 planning@lancastercountysc.net 4929 Monroe Road Charlotte, NC 28205 Oak Engineering January 08, 2025 Greg Welsh Parcel(s) Stage Location Project Number Status Traffic Impact Analysis Approved 0006-00-057.00 9901 & 9831 Barberville Road Project Name Barberville Commercial 20231869 Dear: Greg Welsh We have completed our review. The comments listed on the attached report must be addressed with a response letter. Once revised plans are received, they will be submitted to staff for review. *Please be aware that plans will not be routed for review without a response letter* Sincerely, Chanda Kirkland, Development Service Coordinator Lancaster County Government 101 N Main St Lancaster, SC 29720 P: (803) 416-9390 Page 1 of 21/8/2025 Page 109 of 205 Plan Review Comments County Engineer - Stephen Blackwelder - 8035482406 sblackwelder@lancastercountysc.gov Approved Review Comments: Lancaster County is approving this as proposed without the connection to Overlook at Barber Rock. The potential connection to Overlook at Barber Rock mentioned in the SCDOT comments is a concern for Lancaster County. This would require approval by the Planning Commission and has potential to cause a great deal of complaints from the residents there. If SCDOT is going to require this as a part of their encroachment permit process, we will need to have discussions with them and the development team. Planning - Matthew Blaszyk - 803-285-6005 mblaszyk@lancastercountysc.gov No Review Done Review Comments: Page 2 of 21/8/2025 Page 110 of 205 Traffic Impact Analysis Review – Barberville Road Development Technical Memorandum May 30, 2024 Eric Dillon 1Page | 2 1. Overview of Traffic Impact Analysis (TIA) Report Ramey Kemp submitted a traffic impact analysis report for a mixed-use development fronting Barberville Road at SC 150 in Lancaster County. The report was labeled draft and not signed, and no Engineer on Record (EOR) was verified for this traffic study. Fort Mill Highway (SC 160) at Barberville Road/Stock Lane and Barberville Road at Harbor Bay Drive and one site access across from Fortson Road was analyzed in this report. The proposed access is approximately 670’ north of Fort Mill Highway that lines up with Fortson Road. The site plan in the report showed a mixed use of three parcels that included a day care, strip retail, and small office building. However, there was a plat that was not included in the traffic study that showed eight parcels in addition to the existing cell tower on the property. The report contained existing, no-build, and build traffic volumes for all study locations and with good distribution among all points. There was background development traffic added to the final build models from other approved developments in the area. The analysis final year was determined to be 2026 in the report which is assumed build +1 year for Lancaster County UDO compliance since this is a small development. 2. Items of Interest in the TIA Report The TIA document was redlined with marks highlighting discrepancies/interest items below (pages noted below reflect pdf pages and not report pages): Cover Page – No PE signature and no EOR labeled. Page 6 – Analysis year 2026 does not state that the build year is 2025 which could be assumed due to the small size of the development which could be completed next year. Page 8 – Site plan in study shows 3 parcels with existing cell tower which the analysis was done for. A plat received by Lancaster County shows 8 parcels. Page 9 – Traffic counts are a year old – study must have been delayed in submitting. Page 16 – Growth rate showed only 1% based on 3 years of SCDOT count station data. Should use 5 – 10 years to get a more accurate rate. However, a significant amount of background traffic was established based on previous approved developments. Page 70 – Should utilize Peak Hour Factor (PHF) from traffic counts and not Synchro defaults at PHF = .92. SCDOT default is PHF = .90. Page 70 - Volumes utilized in AM Build Synchro do not match AM Build volumes in Figure 8 in the report. Need to show additional reports to reflect Queuing southbound on Barberville Road at Fort Mill Highway. Micro analysis would be good to determine if queues could possibly reach the proposed access at build out. Page 73 – Major delay for WB traffic on Fort Mill Highway during PM peak which is also shown in the No-Build scenario. 3. Checklist Comments An accompanying TIA checklist that reviews all submitted information for proper TIA submittal. Main items are the site plan and separate plat discrepancies. Site engineer needs to verify sight distance for access. Page 111 of 205 Traffic Impact Analysis Review – Barberville Road Development Technical Memorandum May 30, 2024 Eric Dillon 2Page | 2 4. Recommendations/Action Items Action items are as follows: If future development causes additional parcels to be developed other than those presented in this study; a new traffic impact study will be required. Verify sight distance for the access point. Traffic study needs to be reviewed and corrected by EOR and signed and stamped by the EOR. Conduct a queue analysis for the Barberville Road SB movement at Fort Hill Highway to determine any impediment to the proposed access. Install left turn lane on Barberville Road as recommended by extending the 3-lane section from Fort Mill Highway. Page 112 of 205 481 Garlington Road, Suite L | Greenville, SC 29615 | 864-565-0510 | www.ice-eng.com An Equal Opportunity Employer Project Name: TIA Checklist N/A Yes No ☐ ☐ ☒South Carolina PE Stamp and Signature on TIA/Plans ☐ ☒ ☐Introduction and Executive Summary ☐ ☒ ☐Study Area Descriptions and Roadway Classifications ☐ ☒ ☒Analysis Period Correct ☐ ☒ ☐Existing Traffic Operations ☐ ☒ ☐Other projected transportation improvements in the study area ☐ ☒ ☐Trip Generation Summary ☐ ☒ ☐Trip Distribution and traffic assignment ☐ ☒ ☐LOS Analysis: Background traffic growth and site build out ☐ ☐ ☒Analysis of Sight Distance at Access Points * ☐ ☒ ☐Identify need for Turn Lanes, Capacity and Storage Length ☒ ☐ ☐Identify need for Signalization ☐ ☒ ☐Identify Measures to Mitigate LOS deficiencies ☐ ☒ ☐Vicinity Map ☐ ☒ ☒Site Plan and Proposed Land Use** ☐ ☒ ☐Existing Peak hour volumes (counts conducted within the last 12 months) ☐ ☒ ☐Projected Background Peak Hour Volumes - ☐ ☒ ☐Trip Distribution % Including Added Project Peak Hour Volumes ☐ ☒ ☒Project Build-Out Volumes*** ☐ ☒ ☐Existing and Recommended Lane Configurations ☐ ☒ ☐Intersection LOS (existing, background, build, mitigated) ☐ ☒ ☐Unified Development Ordinance Section 6.8 Comments: * Sight distance was noted to be verified by site engineer for access ** Site plan in study shows 3 parcels, a separate plat shows 8 parcels *** Discrepancy in Build Volumes between the Figure 8 and Synchro for AM Peak Barberville Road Mixed-Use Development Page 113 of 205 TRAFFIC IMPACT STUDY for the Barberville Road Development Located in Lancaster County, South Carolina Prepared for Moody Holdings & Development Prepared by Ramey Kemp Associates, Inc. June 2023 RKA Project #23126 Page 114 of 205 TRAFFIC IMPACT STUDY for the Barberville Road Development Located in Lancaster County, South Carolina Prepared for Moody Holdings & Development 6201 Fairview Rd, Ste 200 Charlotte, North Carolina 28210 Prepared by Ramey Kemp Associates, Inc. 1411 Gervais Street, Suite 150 Columbia, South Carolina 29201 June 2023 RKA Project #23126 Page 115 of 205 Barberville Road TIS | i Table of Contents EXECUTIVE SUMMARY .................................................................................................................. iii 1.1. Project Background ............................................................................................. 1 1.2. Existing Roadway Conditions ........................................................................... 4 1.3. Existing Traffic Count ........................................................................................ 4 1.4. Driveway Location ............................................................................................. 4 2. PROJECT TRAFFIC ...................................................................................................................... 7 2.1. Proposed Land Uses ........................................................................................... 7 2.2. Trip Generation Estimates ................................................................................. 7 2.3. Trip Distribution & Assignment ....................................................................... 8 3. TRAFFIC VOLUME DEVELOPMENT .................................................................................... 11 3.1. Future No-Build Traffic Volumes ................................................................... 11 3.2. Build Out Traffic Volumes ............................................................................... 11 4. TRAFFIC IMPACT ANALYSIS ................................................................................................. 14 4.1. Turn-Lane Analysis .......................................................................................... 14 4.2. Intersection LOS Analysis ................................................................................ 14 5. SUMMARY OF FINDINGS AND RECOMMENDATIONS ................................................. 18 Page 116 of 205 Barberville Road TIS | ii List of Tables Table 1 – Street Inventory ......................................................................................................................... 4 Table 2 – Trip Generation Estimates ....................................................................................................... 7 Table 3 – HCM 6th Edition LOS Criteria for Unsignalized and Signalized Intersections ................ 14 Table 4 – Unsignalized and Signalized Intersection Analysis Results ............................................. 15 Table 5 – Unsignalized and Signalized Intersection Analysis Results ............................................. 16 List of Figures Figure 1 – Project Location Map .............................................................................................................. 2 Figure 2 – Conceptual Site Plan ............................................................................................................... 3 Figure 3 – Existing Lane Configuration .................................................................................................. 5 Figure 4 – Existing (2023) Peak-Hour Traffic Volumes ........................................................................ 6 Figure 5 – Project Trip Distribution ......................................................................................................... 9 Figure 6 – Project Trip Assignment ....................................................................................................... 10 Figure 7 – No-Build (2026) Peak-Hour Traffic Volumes .................................................................... 12 Figure 8 – Build (2026) Peak-Hour Traffic Volumes ........................................................................... 13 Figure 9 – Proposed Lane Configuration .............................................................................................. 17 List of Appendices A) Traffic Scoping B) Traffic Count Data C) Traffic Volume Development Worksheets and ITE Trip Generation Worksheets D) Turn-Lane Analysis Worksheets E) Capacity Analysis Page 117 of 205 Barberville Road TIS | iii EXECUTIVE SUMMARY A traffic impact study was conducted for the proposed Barberville Road development in accordance with SCDOT guidelines. The development is located west of Barberville Road (S-29-42) and north of SC 160 in Lancaster County, South Carolina. The development is proposed to consist of a roughly 120 student school/daycare center, 18,000 SF of retail space and 8,000 SF of office space. The site will have one access on Barberville Road, with internal connections to adjacent parcels. Based on the anticipated build out volumes, a northbound left turn lane is warranted and recommended on Barberville Road at the access point. An auxiliary southbound right turn lane is not warranted. The site access should include one ingress and two egress lanes (50’ storage) and should be designed to provide proper sight distances and meet SCDOT design criteria. With construction of the project, Barberville Road & Harbor Bay Drive should continue to function adequately. The intersection of Fort Mill Highway (SC 160) at Barberville Road expected to experience delays with or without the development. Lancaster County guidelines specify that if the LOS on a principal arterial is below LOS D, then the TIS “shall identify those improvements required to ensure that development related traffic demands result in no net reduction in LOS, and identify additional improvements needed to raise the level of service on the applicable street to the adopted LOS standard.” The signalized Fort Mill Highway & Barberville Road intersection currently operates as an LOS E and is expected to reach LOS F in the No Build conditions. Auxiliary turn lanes are already present on SC 160 and on southbound Barberville Road. Raising the level of service on the Fort Mill Highway (SC 160) at Barberville Road to a LOS D would require additional eastbound and westbound through lanes along SC 160, along with signal timing optimization. TIS’s for the background developments (2,000+ residential units) did not recommend widening SC 160 as part of the background conditions. The proposed development should not add significant amounts of traffic to the area. No additional improvements to the area roadways are recommended as part of this development. Page 118 of 205 Barberville Road TIS | 1 1. INTRODUCTION The purpose of this report is to document a traffic impact study for the proposed Barberville Road development in accordance with SCDOT guidelines. This report summarizes the procedures and findings of the traffic impact study. Traffic scoping documentation is provided in Appendix A. 1.1. Project Background The development is located west of Barberville Road (S-29-42) and north of SC 160 in Lancaster County, South Carolina. The development is proposed to consist of a roughly 120 student school/daycare center, 18,000 SF of retail space and 8,000 SF of office space. The site will have one access on Barberville Road, with internal connections to adjacent parcels. The traffic impact study considers the weekday AM peak period (between 7:00 AM and 9:00 AM) and the weekday PM peak period (between 4:00 PM and 6:00 PM) as the study time frames. The following intersections are studied:  Fort Mill Highway (SC 160) & Barberville Road (S-29-42)/ Stock Lane  Barberville Road (S-29-42) & Harbor Bay Drive  Barberville Road (S-29-42) & Fortson Road /Site Access Future-year analyses assume 2026 conditions as the Build scenario. Figure 1 shows the location of the project site, and Figure 2 illustrates the conceptual site plan. Page 119 of 205 Barberville Road TIS - Traffic Impact Study Figure 1 - Project Location Map Page 2 Barberville RoadHarbor Bay LaneSite Access Page 120 of 205 Barberville Road TIS - Traffic Impact Study Figure 2 - Conceptual Site Plan Page 3 Page 121 of 205 Barberville Road TIS | 4 1.2. Existing Roadway Conditions A review of the existing roadway conditions in the study area was conducted and is summarized in Table 1. Figure 3 illustrates the existing lane geometry. Table 1 – Street Inventory 1.SCDOT Count Station 29-0163; 2.SCDOT Count Station 29-0195 1.3. Existing Traffic Count Vehicle turning movement counts were collected in May 2023 for the AM peak period (7:00 AM to 9:00 AM) and PM peak period (4:00 PM to 6:00 PM) at the following intersections:  Fort Mill Highway (SC 160) & Barberville Road (S-29-42)/ Stock Lane  Barberville Road (S-29-42) & Harbor Bay Drive All counts were conducted while the local school district was in session. The 2023 raw traffic volumes are provided in Appendix A. Existing traffic volumes are illustrated in Figure 4. 1.4. Driveway Location The development is expected to provide one (1) full access driveway on Barberville Road. The proposed site Access is located approximately 670 feet north of Fort Mill Highway. The proposed driveways appear to meet the SCDOT ARMS spacing requirements. Facility Name Route # Typical Cross Section Posted Speed Limit Maintained By 2021 AADT Fort Mill Highway SC 160 3-lane undivided (TWLTL) 45 MPH SCDOT 15,200 1 Barberville Road S-29-42 2-lane undivided 40 MPH SCDOT 7,900 2 Stock Lane N/A 2-lane undivided N/P Local N/A Harbor Bay Drive N/A 2-lane undivided N/P Local N/A Fortson Road N/A 2-lane undivided N/P Local N/A Page 122 of 205 Page 5 Barberville Road TIS - Traffic Impact Study Figure 3 - Existing Lane Configuration 260' 210'220' Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane Harbor Bay Lane Page 123 of 205 2 '2'! 3 '3'! 1 '1'! Page 6 0 (1)(0)(0) Barberville Road TIS - Traffic Impact Study Figure 4 - Existing (2023) Peak-Hour Traffic Volumes 0 (0) (312) 525 (785) 759 000 (0) 2610124 120 (202) 565 (695) (511)(145)(0)(366)641388 (516) (22) 19 (32)(479)5636 (10) 31 10369(5)(494) Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane Harbor Bay Lane Page 124 of 205 Barberville Road TIS | 7 2. PROJECT TRAFFIC 2.1. Proposed Land Uses The Barberville Road development is proposed to contain a 120 student school/daycare center, with additional parcels that are envisioned to include approximately 18,000 SF of retail space and 8,000 SF of office space. The project site is currently vacant. 2.2. Trip Generation Estimates The trip generation potential was estimated using information contained in ITE’s Trip Generation Manual, 11th Edition (2021) for land use code (LUC) 565 – Day Care Center, (LUC) 822 Strip Retail Plaza and (LUC) 712 – Small Office Building . The trip generation estimates for the weekday daily, the weekday AM peak-hour of the adjacent street, and the weekday PM peak-hour of the adjacent street time periods are shown in Table 2. Table 2 – Trip Generation Estimates Page 125 of 205 Barberville Road TIS | 8 2.3. Trip Distribution & Assignment New external traffic expected to be generated was distributed and assigned to the roadway network based on the existing patterns and surrounding land uses. The general distribution of new external project trips was assumed to be:  70% to/from the south via Barberville Road and  30% to/from the north via Barberville Road The directional distribution assumptions are shown in Figure 5. The assignment of the project traffic is shown in Figure 6. Page 126 of 205 30%30%30%70% 30% 70%50%20% Page 9 Barberville Road TIS - Traffic Impact Study Figure 5 - Project Trip Distribution 20% 50% Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane Site AccessHarbor Bay Lane30% 50%20% Project Site Page 127 of 205 2 '2'! 3 '3'! 1 '1'! Page 10 Barberville Road TIS - Traffic Impact Study Figure 6 - Project Trip Assignment 16 (20) (53) 41 3112 43 (73)(58)(23)57 (35) 18 (81) 25 (32)(35) 1825 (32) Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane Site AccessHarbor Bay LaneProject Site Page 128 of 205 Barberville Road TIS | 11 3. TRAFFIC VOLUME DEVELOPMENT 3.1. Future No-Build Traffic Volumes To develop an annual background growth rate for use in the analysis, count data was reviewed from the years 2017 to 2020 at SCDOT Count Station 29-0163 and 29-195. Reviewing the historic growth and observing the growth pattern in the surrounding area, a 1.0% annual growth was adopted for this study. This annual growth rate was utilized to develop the 2026 No-Build traffic volumes. Several vested developments were considered for the study area. Site traffic from the Lodges at Indian Land, Harrisburg Road Residential (Sugar Creek), Redwood Apartments, Pettus Pond, Patterson Preserve and Patterson Lane Apartments were included in the vested trips. The vested projects include a total of 2,014 residential units expected to be completed before the Barberville Road development build out. None of the Traffic Impact Studies for these developments recommended any improvements to the Fort Mill Highway (SC 160) at Barberville Road. The site trips from the vested developments are provided in Appendix A. The 2026 No-Build volumes are illustrated in Figure 7. 3.2. Build Out Traffic Volumes The site generated traffic volumes were added to the 2026 No-Build traffic volumes to determine the 2026 Build volumes. The 2026 Build volumes are illustrated in Figure 8. Volume development worksheets are included in Appendix B. Page 129 of 205 2 '2'! 3 '3'! 1 '1'! Page 12 0 (1)(0)(0) Barberville Road TIS - Traffic Impact Study Figure 7 - No-Build (2026) Peak-Hour Traffic Volumes 0 (0) (424) 573 (865) 821 000 (0) 3610167 159 (242) 633 (749) (663)(208)(0)(412)727531 (625) (23) 20 (33)(630)5722 (10) 32 10511(5)(603) Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane Harbor Bay Lane Page 130 of 205 2 '2'! 3 '3'! 1 '1'! Page 13 0 (1)(0)(0) Barberville Road TIS - Traffic Impact Study Figure 8 - Build (2026) Peak-Hour Traffic Volumes 0 (0) (477) 614 (865) 821 000 (0) 3920179 175 (262) 633 (749) 43 (73)(663)(266)(0)(435)57727 (35) 18 (81) 25531(32)(625) (23) 20 (33)(665)5740 (10) 32 10536(5)(635) Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane Site AccessHarbor Bay LaneProject Site Page 131 of 205 Barberville Road TIS | 14 4. TRAFFIC IMPACT ANALYSIS 4.1. Turn-Lane Analysis Auxiliary turn-lane analyses were conducted using the 2026 Build volumes. Turn-lane analyses were considered based on the SCDOT Roadway Design Manual (RDM) Section 9.5.1. Based on the anticipated build out volumes, a northbound left turn lane is warranted and recommended on Barberville Road at the access point. An auxiliary southbound right turn lane is not warranted. The site access should be designed to provide proper sight distances and meet SCDOT design criteria. Turn-lane analyses are provided in Appendix D. 4.2. Intersection LOS Analysis Intersection analyses were conducted for the study intersections considering 2023 Existing conditions, 2026 No-Build conditions, and 2026 Build conditions. This analysis was conducted using the Transportation Research Board’s Highway Capacity Manual 6th Edition (HCM 6th Edition) methodologies of the Synchro, Version 11 software. Intersection level of service (LOS) grades range from LOS A to LOS F, which are directly related to the level of control delay at the intersection and characterize the operational conditions of the intersection traffic flow. LOS A operations typically represent ideal, free-flow conditions where vehicles experience little to no delays, and LOS F operations typically represent poor, forced-flow (bumper-to-bumper) conditions with high vehicular delays and are generally considered undesirable. Table 3 summarizes the HCM 6th Edition control delay thresholds associated with each LOS grade for unsignalized and signalized intersections. Table 3 – HCM 6th Edition LOS Criteria for Unsignalized and Signalized Intersections Unsignalized Intersections Signalized Intersections LOS Control Delay per Vehicle (seconds) LOS Control Delay per Vehicle (seconds) A ≤ 10 A ≤ 10 B > 10 and ≤ 15 B > 10 and ≤ 20 C > 15 and ≤ 25 C > 20 and ≤ 35 D > 25 and ≤ 35 D > 35 and ≤ 55 E > 35 and ≤ 50 E > 55 and ≤ 80 F > 50 F > 80 Page 132 of 205 Barberville Road TIS | 15 As part of the intersection analysis, SCDOT’s default Synchro parameters were utilized. A constant PHF of 0.92 was applied for future year analysis. Existing heavy vehicle percentages were utilized for all analysis scenarios, with a minimum percentage of 2% considered. Using the Synchro software, intersection analyses were conducted for the weekday AM peak-hour and weekday PM peak-hour time periods. A 150-foot storage northbound left turn lane was analyzed in the build conditions at the site access. The results of the intersection analyses are summarized in Table 4. Table 4 – Unsignalized and Signalized Intersection Analysis Results Intersection Approach LOS/Delay (seconds) 2023 Existing Conditions 2026 No-Build Conditions 2026 Build Conditions AM PM AM PM AM PM Fort Mill Highway (SC 160) & Barberville Road (Signalized) EB C/34.9 C/19.2 E/66.7 C/34.0 E/76.3 D/39.6 WB C/20.3 C/27.4 E/64.6 F/148.5 D/51.9 F/168.0 NB A/0.0 E/75.5 A/0.0 F/88.7 A/0.0 F/88.7 SB E/70.4 F/198.9 F/84.3 F/86.2 F/105.8 F/99.2 Overall D/36.5 E/58.8 E/69.5 F/84.3 E/75.7 F/95.8 Barberville Road & Harbor Bay Drive (Unsignalized) EB1 C/19.4 C/15.9 C/26.5 C/20.1 D/27.8 C/21.5 NB2 A/8.2 A/8.6 A/8.6 A/9.0 A/8.7 A/9.2 Barberville Road & Site Access (Unsignalized) EB -- -- -- -- C/20.3 D/26.9 NB2 -- -- -- -- A/8.9 A/9.5 1.LOS for major street left-turn movement; 2.LOS for minor street approach With construction of the project, Barberville Road & Harbor Bay Drive should continue to function adequately. The site access should include one ingress and two egress lanes (50’ storage). The intersection of Fort Mill Highway (SC 160) at Barberville Road expected to experience delays with or without the development. Lancaster County guidelines specify that if the LOS on a principal arterial is below LOS D, then the TIS “shall identify those improvements required to ensure that development related traffic demands result in no net reduction in LOS, and identify additional improvements needed to raise the level of service on the applicable street to the adopted LOS standard.” The signalized Fort Mill Highway & Barberville Road intersection currently operates as an LOS E. and is expected to reach LOS F in the No Build conditions. Auxiliary turn lanes are already present on SC 160 and on southbound Barberville Road. To raise the level of service on the Fort Mill Page 133 of 205 Barberville Road TIS | 16 Highway (SC 160) at Barberville Road to a LOS D, additional eastbound and westbound through lanes along SC 160 would be required, along with signal timing optimization. TIS’s for the background developments (2,000+ residential units) did not recommend widening SC 160 as part of the background conditions. The proposed development should not add significant amounts of traffic to the area. No additional improvements to the area roadways are recommended as part of this development. If SC 160 were widened to provide a four-lane section, the LOS would be as shown in Table 5. Table 5 – Unsignalized and Signalized Intersection Analysis Results Intersection Approach LOS/Delay (seconds) 2026 Build Improved Conditions AM PM Fort Mill Highway (SC 160) & Barberville Road (Signalized) EB C/34.5 C/27.5 WB C/28.6 C/33.5 NB A/0.0 F/88.7 SB E/77.8 E/73.3 Overall D/41.6 D/40.0 Figure 9 shows the recommended lane configuration for the Build (2026) condition. A capacity analysis summary is proved in Appendix D. Page 134 of 205 Page 17 Barberville Road TIS - Traffic Impact Study Figure 9 - Proposed Lane Configuration 250' 225'200' 150' 50' Fort Mill Highway (SC 160) Fort Mill Highway (SC 160)Stock Lane Site AccessHarbor Bay LaneProject Site Page 135 of 205 Barberville Road TIS | 18 5. SUMMARY OF FINDINGS AND RECOMMENDATIONS A traffic impact study was conducted for the proposed Barberville Road development in accordance with SCDOT guidelines. The development is located west of Barberville Road (S-29-42) and north of SC 160 in Lancaster County, South Carolina. The development is proposed to consist of a roughly 120 student school/daycare center, 18,000 SF of retail space and 8,000 SF of office space. The site will have one access on Barberville Road, with internal connections to adjacent parcels. Based on the anticipated build out volumes, a northbound left turn lane is warranted and recommended on Barberville Road at the access point. An auxiliary southbound right turn lane is not warranted. The site access should include one ingress and two egress lanes (50’ storage) and should be designed to provide proper sight distances and meet SCDOT design criteria. With construction of the project, Barberville Road & Harbor Bay Drive should continue to function adequately. The intersection of Fort Mill Highway (SC 160) at Barberville Road expected to experience delays with or without the development. Lancaster County guidelines specify that if the LOS on a principal arterial is below LOS D, then the TIS “shall identify those improvements required to ensure that development related traffic demands result in no net reduction in LOS, and identify additional improvements needed to raise the level of service on the applicable street to the adopted LOS standard.” The signalized Fort Mill Highway & Barberville Road intersection currently operates as an LOS E. and is expected to reach LOS F in the No Build conditions. Auxiliary turn lanes are already present on SC 160 and on southbound Barberville Road. Raising the level of service on the Fort Mill Highway (SC 160) at Barberville Road to a LOS D would require additional eastbound and westbound through lanes along SC 160, along with signal timing optimization. TIS’s for the background developments (2,000+ residential units) did not recommend widening SC 160 as part of the background conditions. The proposed development should not add significant amounts of traffic to the area. No additional improvements to the area roadways are recommended as part of this development. Page 136 of 205 APPENDIX A Traffic Scoping Page 137 of 205 1 Tahera Anjuman From: Love, Allison C. <LoveAC@scdot.org> Sent: Wednesday, March 29, 2023 12:43 PM To: Tahera Anjuman Cc: Gamble, David D.; Stephen Blackwelder Subject: RE: Traffic Scoping for SC 160 and Barberville Road TIS Development Good afternoon, Tahera. I agree with the times for traffic counts. Please make sure they are recorded while school is in regular session, and not while school is out for spring break. Please include these study intersections:  Harbor Bay Drive/Barberville Road  Site Access/Fortson Road  Barberville Road/SC Highway 160/Stock Lane Lancaster County staff can tell you about any developments in the area that have received site plan or preliminary plat approval, but have not been built. It looks like the road into the adjacent subdivision to the north was stubbed as a cul-de-sac for connectivity between the neighborhood and this parcel. If that is the case, then the Department would support that connection, as the proposed commercial uses could be patronized by the residents without adding turn movements onto Barberville Road. Thank you, Allison From: Tahera Anjuman <tanjuman@rameykemp.com> Sent: Friday, March 24, 2023 9:11 AM To: Love, Allison C. <LoveAC@scdot.org> Subject: Traffic Scoping for SC 160 and Barberville Road TIS Development *** This is an EXTERNAL email. Please do not click on a link or open any attachments unless you are confident it is from a trusted source. *** Good Morning Allison, I hope you are doing well. We have a request for a proposal near SC 160 and Barberville Road in Lancaster County. Please see attached site plan. The development is proposed to consist of a roughly 120 student school/daycare Center, with additional parcels that are envisioned to include approximately 18,000 SF of retail space and 8,000 SF of office space. I am assuming the following traffic count for the project between 7-9AM and 4-6PM should be sufficient. Please let me know your thoughts and what vested developments you would like us to consider for this project. If you have any other considerations or concerns, please do let me know. I appreciate your guidance.  SC 160 & Barberville Road (S-29-42) Thanks, Page 138 of 205 1 Tahera Anjuman From: Chanda Kirkland <CKirkland@lancastersc.net> Sent: Friday, May 19, 2023 1:05 PM To: Tahera Anjuman Cc: Stephen Blackwelder Subject: RE: Traffic Scoping for SC 160 and Barberville Road TIS Development Good Morning Anjuman, Below are vested projects that may need to be included in the study. 1. The Lodges Development consisting of multi-family apartments, townhomes and cottages. 2. Sugar Creek 3. Redwood 4. Pettus Pond 5. Patterson Preserve 6. Tapestry Patterson Lane Apartments You can use our online project portal to search the above projects to hopefully get the information you need if no the engineer contact information is also listed. Hope this information helps. Chanda www.mylancastersc.org Chanda Kirkland, Development Service Coordinator Building Lancaster County Government PO Box 1809 101 N Main St Lancaster, SC 29720 P: (803) 416-9390 F: (877) 636-3035 CKirkland@lancastersc.net CONFIDENTIALITY NOTICE: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain private, restricted and/or legally privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply email and destroy all copies of the original message. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of Lancaster County. Finally, the recipient should check this email and any attachments for the presence of viruses. Lancaster County accepts no liability for any damage caused by any virus transmitted by this email. NOTICE: All email correspondence to and from this address may be subject to public disclosure under the SC Freedom of Information Act. From: Stephen Blackwelder <sblackwelder@lancastersc.net> Sent: Thursday, May 18, 2023 1:55 PM To: Chanda Kirkland <CKirkland@lancastersc.net> Subject: FW: Traffic Scoping for SC 160 and Barberville Road TIS Development You don't often get email from ckirkland@lancastersc.net. Learn why this is important Page 139 of 205 Page 140 of 205 Page 141 of 205 Page 142 of 205 Page 143 of 205 Page 144 of 205 Page 145 of 205 Page 146 of 205 Page 147 of 205 Page 148 of 205 Page 149 of 205 APPENDIX B Traffic Count Data Page 150 of 205 BARBERVILLE RD BARBERVILLE RDHARBOR BAY DRHARBOR BAY DR(303) 216-2439www.alltrafficdata.netLocation:1 BARBERVILLE RD & HARBOR BAY DR AMWednesday, May 3, 2023Date: Peak Rolling Hour Flow Rates Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - PedestriansTraffic Counts - Motorized VehiclesNote: Total study counts contained in parentheses.Peak Hour:07:30 AM - 08:30 AMPeak 15-Minutes:08:00 AM - 08:15 AM Heavy Vehicle Percentage and Peak Hour Factor 379 6670064138850150.97NSEW0.910.000.940.83(1,147)(684)()()(40)(101)(1,107)(705)10000001903100369563600HARBOR BAY DRHARBOR BAY DRBARBERVILLE RDBARBERVILLE RD 0000NSEW00000000 0000NSEW00000000LeftThruRightTotalEastboundIntervalStart TimeRollingHourWest East South NorthPedestrian CrossingsU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn7:00 AM 0 1 108 0 0 500 8 0 0 0 0 176 0 0 0 09207 0 0 27:15 AM 0 0 130 0 0 730 11 0 0 0 0 221 0 0 0 01,0193 0 0 47:30 AM 0 2 164 0 0 880 13 0 0 0 0 273 0 0 0 01,0703 0 0 37:45 AM 0 1 147 0 0 910 3 0 0 0 0 250 0 0 0 01,0195 0 0 38:00 AM 0 1 156 0 0 1030 7 0 0 0 0 275 0 0 0 09727 0 0 18:15 AM 0 1 169 0 0 870 8 0 0 0 0 272 0 0 0 04 0 0 38:30 AM 0 7 110 0 0 860 7 0 0 0 0 222 0 0 0 07 0 0 58:45 AM 0 4 106 0 0 830 0 0 0 0 0 203 0 0 0 08 0 0 2Vehicle TypeLeftThruRightEastboundU-TurnWestboundNorthboundSouthboundTotalLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-TurnArticulated Trucks 0 6 0 0 1 00 0 0 0 0 0 70 0 0 0Lights 5 621 0 0 354 1031 0 19 0 0 0 1,0400 0 0 0Mediums 0 9 0 0 14 00 0 0 0 0 0 230 0 0 0Total31 0 19 0 0 0 5 636 0 0 369 10 1,0700 0 0 0LeftThruRightTotalEastboundU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn0.0% 0.0% 0.9% 0.0% 0.0% 0.3%0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.7%0.0% 0.0% 0.0% 0.0%Heavy Vehicle %Heavy Vehicle %Peak Hour FactorPeak Hour Factor0.0% 0.0% 0.9% 0.3% 0.7%0.970.83 0.00 0.94 0.91 0.970.00 0.46 0.94 0.00 0.00 0.900.00 0.67 0.00 0.00 0.00 0.000.81 0.00 0.00 0.60 Page 151 of 205 BARBERVILLE RD STOCK LNSC 160SC 160(303) 216-2439www.alltrafficdata.netLocation:2 BARBERVILLE RD & SC 160 AMWednesday, May 3, 2023Date: Peak Rolling Hour Flow Rates Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - PedestriansTraffic Counts - Motorized VehiclesNote: Total study counts contained in parentheses.Peak Hour:07:30 AM - 08:30 AMPeak 15-Minutes:08:15 AM - 08:30 AM Heavy Vehicle Percentage and Peak Hour Factor 385 645685883001,2848260.97NSEW0.840.910.250.96(1,118)(702)(1,373)(1,594)(1,616)(2,253)(1)(1)2610124120565007595250000000SC 160SC 160BARBERVILLE RDSTOCK LN 0000NSEW00000000 0000NSEW00000000LeftThruRightTotalEastboundIntervalStart TimeRollingHourWest East South NorthPedestrian CrossingsU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn7:00 AM 0 0 0 0 12 00 84 107 0 0 126 398 0 0 0 02,0661 29 0 397:15 AM 0 1 0 0 23 00 112 137 0 0 153 506 0 0 0 02,2540 25 0 557:30 AM 0 0 0 0 29 00 141 169 0 0 137 568 0 0 0 02,3540 31 0 617:45 AM 0 0 0 0 36 00 111 206 0 0 156 594 0 0 0 02,3070 27 0 588:00 AM 0 0 0 0 40 00 140 183 0 0 124 586 0 0 0 02,2630 21 0 788:15 AM 0 0 0 0 19 00 133 201 0 0 148 606 0 0 0 00 41 0 648:30 AM 0 0 0 0 40 00 92 161 0 0 145 521 0 0 0 00 23 0 608:45 AM 0 0 0 0 29 00 73 202 0 0 152 550 0 0 0 00 35 0 59Vehicle TypeLeftThruRightEastboundU-TurnWestboundNorthboundSouthboundTotalLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-TurnArticulated Trucks 0 0 0 0 0 15 6 0 0 7 0 190 0 0 0Lights 0 0 0 118 0 252517 746 0 0 543 114 2,2900 0 0 0Mediums 0 0 0 6 0 83 7 0 0 15 6 450 0 0 0Total525 759 0 0 565 120 0 0 0 124 0 261 2,3540 0 0 0LeftThruRightTotalEastboundU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn0.0% 0.0% 0.0% 0.0% 0.0% 0.0%0.0% 1.0% 0.8% 0.0% 0.0% 1.2% 0.8%0.0% 0.0% 0.0% 0.4%Heavy Vehicle %Heavy Vehicle %Peak Hour FactorPeak Hour Factor0.9% 1.0% 0.0% 0.3% 0.8%0.970.96 0.91 0.25 0.84 0.970.00 0.25 0.00 0.00 0.84 0.000.00 0.93 0.92 0.00 0.00 0.920.25 0.73 0.00 0.84 Page 152 of 205 BARBERVILLE RD BARBERVILLE RDHARBOR BAY DRHARBOR BAY DR(303) 216-2439www.alltrafficdata.netLocation:1 BARBERVILLE RD & HARBOR BAY DR PMWednesday, May 3, 2023Date: Peak Rolling Hour Flow Rates Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - PedestriansTraffic Counts - Motorized VehiclesNote: Total study counts contained in parentheses.Peak Hour:05:00 PM - 06:00 PMPeak 15-Minutes:05:45 PM - 06:00 PM Heavy Vehicle Percentage and Peak Hour Factor 499 4890051151732360.88NSEW0.890.000.790.73(880)(940)()()(76)(56)(913)(953)50000022010004943147901HARBOR BAY DRHARBOR BAY DRBARBERVILLE RDBARBERVILLE RD 0000NSEW00000000 0000NSEW00000000LeftThruRightTotalEastboundIntervalStart TimeRollingHourWest East South NorthPedestrian CrossingsU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn4:00 PM 0 4 83 0 0 830 1 0 0 0 0 179 0 0 0 08674 0 0 44:15 PM 0 10 103 0 0 1140 3 0 0 0 0 239 0 0 0 09397 0 0 24:30 PM 0 4 98 0 0 840 4 0 0 0 0 200 0 0 0 09432 0 0 84:45 PM 0 2 98 0 0 1400 1 0 0 0 0 249 0 0 0 09962 0 0 65:00 PM 0 7 96 0 0 1370 3 0 0 0 0 251 0 0 0 01,0426 0 0 25:15 PM 0 8 115 0 0 1080 2 0 0 0 0 243 0 0 0 09 0 0 15:30 PM 1 7 116 0 0 1230 4 0 0 0 0 253 0 0 0 01 0 0 15:45 PM 0 9 152 0 0 1260 1 0 0 0 0 295 0 0 0 06 0 0 1Vehicle TypeLeftThruRightEastboundU-TurnWestboundNorthboundSouthboundTotalLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-TurnArticulated Trucks 0 1 0 0 2 00 0 0 0 0 0 30 0 0 0Lights 31 472 0 0 483 510 0 20 0 0 0 1,0220 0 1 0Mediums 0 6 0 0 9 00 0 2 0 0 0 170 0 0 0Total10 0 22 0 0 0 31 479 0 0 494 5 1,0420 0 1 0LeftThruRightTotalEastboundU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn0.0% 0.0% 0.2% 0.0% 0.0% 0.4%0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.3%0.0% 0.0% 0.0% 0.0%Heavy Vehicle %Heavy Vehicle %Peak Hour FactorPeak Hour Factor0.0% 0.0% 0.2% 0.4% 0.3%0.880.73 0.00 0.79 0.89 0.880.25 0.86 0.79 0.00 0.00 0.910.00 0.69 0.00 0.00 0.00 0.000.61 0.00 0.00 0.63 Page 153 of 205 BARBERVILLE RD STOCK LNSC 160SC 160(303) 216-2439www.alltrafficdata.netLocation:2 BARBERVILLE RD & SC 160 PMWednesday, May 3, 2023Date: Peak Rolling Hour Flow Rates Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - PedestriansTraffic Counts - Motorized VehiclesNote: Total study counts contained in parentheses.Peak Hour:05:00 PM - 06:00 PMPeak 15-Minutes:05:45 PM - 06:00 PM Heavy Vehicle Percentage and Peak Hour Factor 511 5148971,151101,0978410.95NSEW0.960.880.500.97(917)(951)(1,738)(2,006)(1,899)(2,131)(3)(1)1450366202695007853120001000SC 160SC 160BARBERVILLE RDSTOCK LN 0000NSEW00000000 0000NSEW00000000LeftThruRightTotalEastboundIntervalStart TimeRollingHourWest East South NorthPedestrian CrossingsU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn4:00 PM 0 1 0 0 23 00 71 178 0 0 166 535 0 0 0 02,3171 24 0 714:15 PM 0 0 1 0 22 00 70 193 0 0 196 597 0 0 0 02,3660 32 0 834:30 PM 0 0 0 0 30 00 78 180 0 0 157 551 0 0 0 02,4130 31 0 754:45 PM 0 0 0 0 31 00 65 198 0 0 204 634 0 0 0 02,4780 31 0 1055:00 PM 0 0 0 0 71 00 75 183 0 0 166 584 0 0 0 02,5060 35 0 545:15 PM 0 0 0 0 96 00 70 209 0 0 190 644 0 0 0 00 48 0 315:30 PM 0 1 0 0 104 00 84 194 0 0 158 616 0 0 0 00 45 0 305:45 PM 0 0 0 0 95 00 83 199 0 0 181 662 0 0 0 00 74 0 30Vehicle TypeLeftThruRightEastboundU-TurnWestboundNorthboundSouthboundTotalLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-TurnArticulated Trucks 0 0 0 1 0 11 3 0 0 4 0 100 0 0 0Lights 1 0 0 358 0 143308 775 0 0 687 200 2,4720 0 0 0Mediums 0 0 0 7 0 13 7 0 0 4 2 240 0 0 0Total312 785 0 0 695 202 1 0 0 366 0 145 2,5060 0 0 0LeftThruRightTotalEastboundU-TurnWestboundNorthboundSouthboundLeftThruRightU-TurnLeftThruRightU-TurnLeftThruRightU-Turn0.0% 0.0% 0.0% 0.0% 0.3% 0.0%0.0% 0.3% 0.4% 0.0% 0.0% 0.6% 0.4%0.0% 0.0% 0.0% 0.7%Heavy Vehicle %Heavy Vehicle %Peak Hour FactorPeak Hour Factor0.4% 0.4% 0.0% 0.4% 0.4%0.950.97 0.88 0.50 0.96 0.950.00 0.25 0.25 0.00 0.88 0.000.00 0.93 0.94 0.00 0.00 0.890.25 0.68 0.00 0.80 Page 154 of 205 APPENDIX C Traffic Volume Development Worksheets and ITE Trip Generation Worksheets Page 155 of 205 TRAFFIC CONTROL: DATE COUNTED: EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 525 759 0 0 565 120 0 0 0 124 0 261 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 3 3 3 3 3 3 3 3 3 3 3 3 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 16 23 0 0 17 4 0 0 0 4 0 8 0 13 38 13 4 0 10 8 8 29 1 1 3 3 4 2 6 11 7 3 10 20 26 13 22 39 51 27 31 63 573 821 0 0 633 159 0 0 0 167 0 361 50% 20% 20% 50% 41 16 12 31 41 16 12 31 614 821 0 0 633 175 0 0 0 179 0 392 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 312 785 0 0 695 202 1 0 0 366 0 145 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 3 3 3 3 3 3 3 3 3 3 3 3 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 9 24 0 0 21 6 0 0 0 11 0 4 0 39 24 8 13 0 32 3 5 19 3 3 1 2 13 6 4 7 23 11 7 12 17 9 71 56 33 31 30 40 424 865 0 0 749 242 1 0 0 412 0 208 50% 20% 20% 50% 53 20 23 58 53 20 23 58 477 865 0 0 749 262 1 0 0 435 0 266 Vested Trips (Redwood) Vested Trips (Pettus Pond) Vested Trips (The Lodges) Vested Trips (The Lodges) Inbound Trip Distribution Percentage Outbound Trip Distribution Percentage PM PEAK HOUR (5:00-6:00 PM) 2023 TRAFFIC VOLUMES Vested Trips (Patterson Lane Appartments) Years To Buildout (2026) Yearly Growth Rate Background Traffic Growth Vested Trips (Sugar Creek) Vested Trips (Patterson Preserve) Heavy Vehicle Percentage 2026 NO-BUILD TRAFFIC VOLUMES Inbound New Project Traffic Outbound New Project Traffic Total New Project Traffic 2026 BUILD TRAFFIC VOLUMES Inbound Trip Distribution Percentage Outbound Trip Distribution Percentage Pass-By Project Traffic Background Traffic Growth Vested Trips (Patterson Preserve) Vested Trips (Patterson Lane Appartments) Vested Traffic Volumes Vested Trips (Sugar Creek) Vested Trips (Redwood) Vested Trips (Pettus Pond) INTERSECTION TRAFFIC VOLUME DEVELOPMENT Fort Mill Highway & Barberville Road Signalized Wednesday, May 3, 2023 AM PEAK HOUR (7:30-8:30 AM) Total New Project Traffic Pass-by Project Traffic 2026 BUILD TRAFFIC VOLUMES Vested Traffic Volumes 2026 NO-BUILD TRAFFIC VOLUMES Inbound New Project Traffic Outbound New Project Traffic Yearly Growth Rate Years To Buildout (2026) 2023 TRAFFIC VOLUMES Heavy Vehicle Percentage Page 156 of 205 TRAFFIC CONTROL: DATE COUNTED: EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 31 0 19 0 0 0 5 636 0 0 369 10 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 3 3 3 3 3 3 3 3 3 3 3 3 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1 0 1 0 0 0 0 19 0 0 11 0 13 4 18 37 2 6 6 17 10 30 0 0 49 94 32 0 20 0 0 0 5 722 0 0 511 10 30% 30% 25 18 18 25 32 0 20 0 0 0 5 740 0 0 536 10 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 10 0 22 0 0 0 32 479 0 0 494 5 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 3 3 3 3 3 3 3 3 3 3 3 3 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 0 0 1 0 0 0 1 14 0 0 15 0 8 13 35 24 6 3 19 11 34 19 0 0 102 70 10 0 23 0 0 0 33 630 0 0 603 5 30% 30% 32 35 35 32 10 0 23 0 0 0 33 665 0 0 635 5 Vested Trips (The Lodges) Vested Trips (The Lodges) INTERSECTION TRAFFIC VOLUME DEVELOPMENT Barberville Road & Harbor Bay Drive Unsignalized Wednesday, May 3, 2023 AM PEAK HOUR (7:30-8:30 AM) 2023 TRAFFIC VOLUMES Heavy Vehicle Percentage Years To Buildout (2026) Yearly Growth Rate Pass-By Project Traffic Background Traffic Growth Vested Trips (Sugar Creek) Vested Trips (Patterson Preserve) Vested Trips (Patterson Lane Appartments) Vested Traffic Volumes 2026 NO-BUILD TRAFFIC VOLUMES Inbound Trip Distribution Percentage Outbound Trip Distribution Percentage Inbound New Project Traffic Outbound New Project Traffic Vested Trips (Redwood) Vested Trips (Pettus Pond) Total New Project Traffic 2026 BUILD TRAFFIC VOLUMES PM PEAK HOUR (5:00-6:00 PM) 2023 TRAFFIC VOLUMES Background Traffic Growth Heavy Vehicle Percentage Years To Buildout (2026) Yearly Growth Rate 2026 BUILD TRAFFIC VOLUMES Vested Trips (Sugar Creek) Vested Trips (Patterson Preserve) Vested Trips (Patterson Lane Appartments) Vested Traffic Volumes 2026 NO-BUILD TRAFFIC VOLUMES Inbound Trip Distribution Percentage Outbound Trip Distribution Percentage Inbound New Project Traffic Outbound New Project Traffic Pass-by Project Traffic Total New Project Traffic Vested Trips (Redwood) Vested Trips (Pettus Pond) Page 157 of 205 TRAFFIC CONTROL: DATE COUNTED: EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 0 0 0 0 0 0 641 0 0 388 0 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 3 3 3 3 3 3 3 3 3 3 3 3 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 0 0 0 0 0 0 0 19 0 0 12 0 13 4 18 37 2 6 6 17 10 30 0 0 49 94 0 0 0 0 0 0 0 727 0 0 531 0 70% 30% 30% 70% 57 25 18 43 18 43 57 25 18 0 43 0 0 0 57 727 0 0 531 25 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 0 0 0 0 0 0 511 0 0 516 0 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 3 3 3 3 3 3 3 3 3 3 3 3 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 1.0% 0 0 0 0 0 0 0 15 0 0 15 0 8 13 35 24 6 3 19 11 34 19 0 0 102 70 0 0 0 0 0 0 0 663 0 0 625 0 70% 30% 30% 70% 73 32 35 81 35 81 73 32 35 0 81 0 0 0 73 663 0 0 625 32 Vested Trips (The Lodges) Vested Trips (The Lodges) INTERSECTION TRAFFIC VOLUME DEVELOPMENT Barberville Road & Fortson Road/ Site Access Unsignalized AM PEAK HOUR (7:30-8:30 AM) 2023 TRAFFIC VOLUMES Heavy Vehicle Percentage Years To Buildout (2026) Yearly Growth Rate Pass-By Project Traffic Background Traffic Growth Vested Trips (Sugar Creek) Vested Trips (Patterson Preserve) Vested Trips (Patterson Lane Appartments) Vested Traffic Volumes 2026 NO-BUILD TRAFFIC VOLUMES Inbound Trip Distribution Percentage Outbound Trip Distribution Percentage Inbound New Project Traffic Outbound New Project Traffic Vested Trips (Redwood) Vested Trips (Pettus Pond) Total New Project Traffic 2026 BUILD TRAFFIC VOLUMES PM PEAK HOUR (5:00-6:00 PM) 2023 TRAFFIC VOLUMES Background Traffic Growth Heavy Vehicle Percentage Years To Buildout (2026) Yearly Growth Rate 2026 BUILD TRAFFIC VOLUMES Vested Trips (Sugar Creek) Vested Trips (Patterson Preserve) Vested Trips (Patterson Lane Appartments) Vested Traffic Volumes 2026 NO-BUILD TRAFFIC VOLUMES Inbound Trip Distribution Percentage Outbound Trip Distribution Percentage Inbound New Project Traffic Outbound New Project Traffic Pass-by Project Traffic Total New Project Traffic Vested Trips (Redwood) Vested Trips (Pettus Pond) Page 158 of 205 Page 159 of 205 Page 160 of 205 Page 161 of 205 Page 162 of 205 Page 163 of 205 Page 164 of 205 Page 165 of 205 Page 166 of 205 Page 167 of 205 APPENDIX D Turn Lane Analysis Worksheets Page 168 of 205 INTERSECTION: Barberville Road & Site Access MOVEMENT: Northbound left turn SCENARIO Advancing Volume (Va) Northbound left turn Opposing Volume (Vo) Left Turn % of Va Symbol AM Build 784 57 556 7.3% PM Build 736 73 657 9.9% . Barberville Road TIS LEFT-TURN LANE WARRANT REVIEW AM BuildPM Build ` ` Page 169 of 205 INTERSECTION: Barberville Road & Site Access MOVEMENT: Southbound right turn SCENARIO Design Hour Volume Right Turn Volume Symbol AM Build 556 25 PM Build 657 32 Barberville Road TIS RIGHT-TURN LANE WARRANT REVIEW ` AMBuildPMBuild Page 170 of 205 APPENDIX E Capacity Analysis Page 171 of 205 2023 Existing Conditions Page 172 of 205 HCM 6th Signalized Intersection Summary Barberville Road TIS 100: Fort Mill Highway & Barberville Road 2023 Existing AM RKA Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 525 759 0 0 565 120 0 0 0 124 0 261 Future Volume (veh/h) 525 759 0 0 565 120 0 0 0 124 0 261 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847 Adj Flow Rate, veh/h 571 825 0 0 614 130 0 0 0 135 0 284 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 540 1367 0 0 763 918 0 2 0 316 0 282 Arrive On Green 0.18 0.67 0.00 0.00 0.43 0.43 0.00 0.00 0.00 0.18 0.00 0.18 Sat Flow, veh/h 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565 Grp Volume(v), veh/h 571 825 0 0 614 130 0 0 0 135 0 284 Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565 Q Serve(g_s), s 14.9 18.3 0.0 0.0 24.6 3.0 0.0 0.0 0.0 5.6 0.0 14.7 Cycle Q Clear(g_c), s 14.9 18.3 0.0 0.0 24.6 3.0 0.0 0.0 0.0 5.6 0.0 14.7 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 540 1367 0 0 763 918 0 2 0 316 0 282 V/C Ratio(X) 1.06 0.60 0.00 0.00 0.80 0.14 0.00 0.00 0.00 0.43 0.00 1.01 Avail Cap(c_a), veh/h 540 1697 0 0 1052 1162 0 470 0 316 0 282 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 19.5 7.3 0.0 0.0 20.3 6.8 0.0 0.0 0.0 29.8 0.0 33.5 Incr Delay (d2), s/veh 54.9 0.3 0.0 0.0 2.8 0.1 0.0 0.0 0.0 0.9 0.0 55.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 13.6 5.4 0.0 0.0 9.4 1.3 0.0 0.0 0.0 2.3 0.0 9.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 74.4 7.6 0.0 0.0 23.1 6.9 0.0 0.0 0.0 30.7 0.0 89.3 LnGrp LOS F A A A C A A A A C A F Approach Vol, veh/h 1396 744 0 419 Approach Delay, s/veh 34.9 20.3 0.0 70.4 Approach LOS C C E Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 61.7 0.0 20.0 41.7 20.0 Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3 Max Green Setting (Gmax), s * 68 * 20 14.9 * 48 14.7 Max Q Clear Time (g_c+I1), s 20.3 0.0 16.9 26.6 16.7 Green Ext Time (p_c), s 21.2 0.0 0.0 8.5 0.0 Intersection Summary HCM 6th Ctrl Delay 36.5 HCM 6th LOS D Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Page 173 of 205 HCM 6th TWSC Barberville Road TIS 200: Barberville Road & Harbor Bay Drive 2023 Existing AM RKA Synchro 11 Report Intersection Int Delay, s/veh 1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 31 19 5 636 369 10 Future Vol, veh/h 31 19 5 636 369 10 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 34 21 5 691 401 11 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1108 407 412 0 - 0 Stage 1 407 - - - - - Stage 2 701 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 232 644 1147 - - - Stage 1 672 - - - - - Stage 2 492 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 230 644 1147 - - - Mov Cap-2 Maneuver 230 - - - - - Stage 1 667 - - - - - Stage 2 492 - - - - - Approach EB NB SB HCM Control Delay, s 19.4 0.1 0 HCM LOS C Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1147 - 304 - - HCM Lane V/C Ratio 0.005 - 0.179 - - HCM Control Delay (s) 8.2 0 19.4 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0 - 0.6 - - Page 174 of 205 HCM 6th Signalized Intersection Summary Barberville Road TIS 100: Fort Mill Highway & Barberville Road 2023 Existing PM RKA Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 312 785 0 0 695 202 1 0 0 366 0 145 Future Volume (veh/h) 312 785 0 0 695 202 1 0 0 366 0 145 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847 Adj Flow Rate, veh/h 339 853 0 0 755 220 1 0 0 398 0 158 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 381 1335 0 0 843 950 4 0 0 275 0 245 Arrive On Green 0.13 0.66 0.00 0.00 0.47 0.47 0.00 0.00 0.00 0.16 0.00 0.16 Sat Flow, veh/h 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565 Grp Volume(v), veh/h 339 853 0 0 755 220 1 0 0 398 0 158 Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565 Q Serve(g_s), s 9.7 23.3 0.0 0.0 36.5 5.9 0.1 0.0 0.0 14.7 0.0 8.9 Cycle Q Clear(g_c), s 9.7 23.3 0.0 0.0 36.5 5.9 0.1 0.0 0.0 14.7 0.0 8.9 Prop In Lane 1.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 381 1335 0 0 843 950 4 0 0 275 0 245 V/C Ratio(X) 0.89 0.64 0.00 0.00 0.90 0.23 0.25 0.00 0.00 1.45 0.00 0.65 Avail Cap(c_a), veh/h 436 1474 0 0 914 1009 389 0 0 275 0 245 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 23.8 9.5 0.0 0.0 22.6 7.5 46.9 0.0 0.0 39.7 0.0 37.3 Incr Delay (d2), s/veh 18.1 0.7 0.0 0.0 10.6 0.1 28.7 0.0 0.0 221.0 0.0 5.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.7 8.2 0.0 0.0 15.9 2.6 0.1 0.0 0.0 23.0 0.0 3.7 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 41.9 10.2 0.0 0.0 33.2 7.6 75.5 0.0 0.0 260.7 0.0 43.0 LnGrp LOS D B A A C A E A A F A D Approach Vol, veh/h 1192 975 1 556 Approach Delay, s/veh 19.2 27.4 75.5 198.9 Approach LOS B C E F Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 68.6 5.5 17.3 51.3 20.0 Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3 Max Green Setting (Gmax), s * 68 * 20 14.9 * 48 14.7 Max Q Clear Time (g_c+I1), s 25.3 2.1 11.7 38.5 16.7 Green Ext Time (p_c), s 21.2 0.0 0.5 6.1 0.0 Intersection Summary HCM 6th Ctrl Delay 58.8 HCM 6th LOS E Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Page 175 of 205 HCM 6th TWSC Barberville Road TIS 200: Barberville Road & Harbor Bay Drive 2023 Existing PM RKA Synchro 11 Report Intersection Int Delay, s/veh 0.7 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 10 22 32 479 494 5 Future Vol, veh/h 10 22 32 479 494 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 11 24 35 521 537 5 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1131 540 542 0 - 0 Stage 1 540 - - - - - Stage 2 591 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 225 542 1027 - - - Stage 1 584 - - - - - Stage 2 553 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 214 542 1027 - - - Mov Cap-2 Maneuver 214 - - - - - Stage 1 556 - - - - - Stage 2 553 - - - - - Approach EB NB SB HCM Control Delay, s 15.9 0.5 0 HCM LOS C Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1027 - 366 - - HCM Lane V/C Ratio 0.034 - 0.095 - - HCM Control Delay (s) 8.6 0 15.9 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0.1 - 0.3 - - Page 176 of 205 2026 No-Build Conditions Page 177 of 205 HCM 6th Signalized Intersection Summary Barberville Road TIS 100: Fort Mill Highway & Barberville Road 2026 No- Build AM RKA Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 573 821 0 0 633 159 0 0 0 167 0 361 Future Volume (veh/h) 573 821 0 0 633 159 0 0 0 167 0 361 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847 Adj Flow Rate, veh/h 623 892 0 0 688 173 0 0 0 182 0 392 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 525 1341 0 0 672 929 0 2 0 421 0 374 Arrive On Green 0.24 0.66 0.00 0.00 0.38 0.38 0.00 0.00 0.00 0.24 0.00 0.24 Sat Flow, veh/h 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565 Grp Volume(v), veh/h 623 892 0 0 688 173 0 0 0 182 0 392 Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565 Q Serve(g_s), s 28.9 31.9 0.0 0.0 45.4 6.0 0.0 0.0 0.0 10.5 0.0 28.7 Cycle Q Clear(g_c), s 28.9 31.9 0.0 0.0 45.4 6.0 0.0 0.0 0.0 10.5 0.0 28.7 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 525 1341 0 0 672 929 0 2 0 421 0 374 V/C Ratio(X) 1.19 0.66 0.00 0.00 1.02 0.19 0.00 0.00 0.00 0.43 0.00 1.05 Avail Cap(c_a), veh/h 525 1341 0 0 672 929 0 141 0 421 0 374 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 38.9 12.3 0.0 0.0 37.3 9.9 0.0 0.0 0.0 38.7 0.0 45.7 Incr Delay (d2), s/veh 102.0 2.6 0.0 0.0 40.9 0.4 0.0 0.0 0.0 0.7 0.0 59.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 29.0 13.3 0.0 0.0 26.2 3.5 0.0 0.0 0.0 4.5 0.0 17.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 140.9 14.9 0.0 0.0 78.2 10.4 0.0 0.0 0.0 39.4 0.0 105.1 LnGrp LOS F B A A F B A A A D A F Approach Vol, veh/h 1515 861 0 574 Approach Delay, s/veh 66.7 64.6 0.0 84.3 Approach LOS E E F Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 86.0 34.0 34.0 52.0 0.0 Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3 Max Green Setting (Gmax), s * 65 * 29 28.9 * 31 8.7 Max Q Clear Time (g_c+I1), s 33.9 30.7 30.9 47.4 0.0 Green Ext Time (p_c), s 18.7 0.0 0.0 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 69.5 HCM 6th LOS E Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Page 178 of 205 HCM 6th TWSC Barberville Road TIS 200: Barberville Road & Harbor Bay Drive 2026 No- Build AM RKA Synchro 11 Report Intersection Int Delay, s/veh 1.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 32 20 5 722 511 10 Future Vol, veh/h 32 20 5 722 511 10 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 35 22 5 785 555 11 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1356 561 566 0 - 0 Stage 1 561 - - - - - Stage 2 795 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 165 527 1006 - - - Stage 1 571 - - - - - Stage 2 445 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 164 527 1006 - - - Mov Cap-2 Maneuver 164 - - - - - Stage 1 566 - - - - - Stage 2 445 - - - - - Approach EB NB SB HCM Control Delay, s 26.5 0.1 0 HCM LOS D Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1006 - 223 - - HCM Lane V/C Ratio 0.005 - 0.253 - - HCM Control Delay (s) 8.6 0 26.5 - - HCM Lane LOS A A D - - HCM 95th %tile Q(veh) 0 - 1 - - Page 179 of 205 HCM 6th Signalized Intersection Summary Barberville Road TIS 100: Fort Mill Highway & Barberville Road 2026 No- Build PM RKA Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 424 865 0 0 749 242 1 0 0 412 0 208 Future Volume (veh/h) 424 865 0 0 749 242 1 0 0 412 0 208 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847 Adj Flow Rate, veh/h 461 940 0 0 814 263 1 0 0 448 0 226 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 493 1247 0 0 619 885 4 0 0 421 0 374 Arrive On Green 0.22 0.62 0.00 0.00 0.35 0.35 0.00 0.00 0.00 0.24 0.00 0.24 Sat Flow, veh/h 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565 Grp Volume(v), veh/h 461 940 0 0 814 263 1 0 0 448 0 226 Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565 Q Serve(g_s), s 24.3 39.9 0.0 0.0 41.8 10.5 0.1 0.0 0.0 28.7 0.0 15.4 Cycle Q Clear(g_c), s 24.3 39.9 0.0 0.0 41.8 10.5 0.1 0.0 0.0 28.7 0.0 15.4 Prop In Lane 1.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 493 1247 0 0 619 885 4 0 0 421 0 374 V/C Ratio(X) 0.93 0.75 0.00 0.00 1.32 0.30 0.25 0.00 0.00 1.06 0.00 0.60 Avail Cap(c_a), veh/h 525 1247 0 0 619 885 135 0 0 421 0 374 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 37.5 16.6 0.0 0.0 39.1 12.4 59.8 0.0 0.0 45.7 0.0 40.6 Incr Delay (d2), s/veh 23.5 4.2 0.0 0.0 153.1 0.9 28.9 0.0 0.0 62.2 0.0 2.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 16.1 17.7 0.0 0.0 43.5 6.0 0.1 0.0 0.0 19.4 0.0 6.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 61.0 20.8 0.0 0.0 192.1 13.2 88.7 0.0 0.0 107.9 0.0 43.3 LnGrp LOS E C A A F B F A A F A D Approach Vol, veh/h 1401 1077 1 674 Approach Delay, s/veh 34.0 148.5 88.7 86.2 Approach LOS C F F F Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 80.4 34.0 32.0 48.4 5.6 Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3 Max Green Setting (Gmax), s * 65 * 29 28.9 * 31 8.7 Max Q Clear Time (g_c+I1), s 41.9 30.7 26.3 43.8 2.1 Green Ext Time (p_c), s 16.2 0.0 0.6 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 84.3 HCM 6th LOS F Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Page 180 of 205 HCM 6th TWSC Barberville Road TIS 200: Barberville Road & Harbor Bay Drive 2026 No- Build PM RKA Synchro 11 Report Intersection Int Delay, s/veh 0.7 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 10 23 33 630 603 5 Future Vol, veh/h 10 23 33 630 603 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 11 25 36 685 655 5 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1415 658 660 0 - 0 Stage 1 658 - - - - - Stage 2 757 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 151 464 928 - - - Stage 1 515 - - - - - Stage 2 463 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 141 464 928 - - - Mov Cap-2 Maneuver 141 - - - - - Stage 1 483 - - - - - Stage 2 463 - - - - - Approach EB NB SB HCM Control Delay, s 20.1 0.4 0 HCM LOS C Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 928 - 274 - - HCM Lane V/C Ratio 0.039 - 0.131 - - HCM Control Delay (s) 9 0 20.1 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0.1 - 0.4 - - Page 181 of 205 2026 Build Conditions Page 182 of 205 HCM 6th Signalized Intersection Summary Barberville Road TIS 100: Fort Mill Highway & Barberville Road 2026 Build AM RKA Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 582 782 0 0 582 140 0 0 0 140 0 300 Future Volume (veh/h) 582 782 0 0 582 140 0 0 0 140 0 300 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847 Adj Flow Rate, veh/h 633 850 0 0 633 152 0 0 0 152 0 326 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 520 1324 0 0 691 586 0 439 0 469 0 353 Arrive On Green 0.21 0.65 0.00 0.00 0.39 0.39 0.00 0.00 0.00 0.23 0.00 0.23 Sat Flow, veh/h 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565 Grp Volume(v), veh/h 633 850 0 0 633 152 0 0 0 152 0 326 Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 0 1949 0 1759 0 1565 Q Serve(g_s), s 20.9 24.7 0.0 0.0 33.3 6.8 0.0 0.0 0.0 7.2 0.0 20.1 Cycle Q Clear(g_c), s 20.9 24.7 0.0 0.0 33.3 6.8 0.0 0.0 0.0 7.2 0.0 20.1 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 520 1324 0 0 691 586 0 439 0 469 0 353 V/C Ratio(X) 1.22 0.64 0.00 0.00 0.92 0.26 0.00 0.00 0.00 0.32 0.00 0.92 Avail Cap(c_a), veh/h 520 1366 0 0 728 617 0 439 0 478 0 360 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 28.5 10.2 0.0 0.0 28.6 20.5 0.0 0.0 0.0 32.4 0.0 37.4 Incr Delay (d2), s/veh 114.0 0.9 0.0 0.0 15.7 0.2 0.0 0.0 0.0 0.4 0.0 28.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 28.2 9.1 0.0 0.0 16.0 2.3 0.0 0.0 0.0 3.0 0.0 10.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 142.4 11.1 0.0 0.0 44.2 20.6 0.0 0.0 0.0 32.8 0.0 66.1 LnGrp LOS F B A A D C A A A C A E Approach Vol, veh/h 1483 785 0 478 Approach Delay, s/veh 67.2 39.7 0.0 55.5 Approach LOS E D E Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 71.0 27.6 26.0 45.0 27.6 Change Period (Y+Rc), s * 6.6 * 5.4 5.1 * 6.6 5.4 Max Green Setting (Gmax), s * 66 * 23 20.9 * 40 8.6 Max Q Clear Time (g_c+I1), s 26.7 22.1 22.9 35.3 0.0 Green Ext Time (p_c), s 20.2 0.1 0.0 3.0 0.0 Intersection Summary HCM 6th Ctrl Delay 57.3 HCM 6th LOS E Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Page 183 of 205 HCM 6th TWSC Barberville Road TIS 200: Barberville Road & Harbor Bay Drive 2026 Build AM RKA Synchro 11 Report Intersection Int Delay, s/veh 1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 32 20 5 673 405 10 Future Vol, veh/h 32 20 5 673 405 10 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 35 22 5 732 440 11 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1188 446 451 0 - 0 Stage 1 446 - - - - - Stage 2 742 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 208 612 1109 - - - Stage 1 645 - - - - - Stage 2 471 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 206 612 1109 - - - Mov Cap-2 Maneuver 206 - - - - - Stage 1 640 - - - - - Stage 2 471 - - - - - Approach EB NB SB HCM Control Delay, s 21.3 0.1 0 HCM LOS C Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1109 - 277 - - HCM Lane V/C Ratio 0.005 - 0.204 - - HCM Control Delay (s) 8.3 0 21.3 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0 - 0.7 - - Page 184 of 205 HCM 6th TWSC Barberville Road TIS 300: Barberville Road & Site Access 2026 Build AM RKA Synchro 11 Report Intersection Int Delay, s/veh 1.3 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 18 43 57 714 527 25 Future Vol, veh/h 18 43 57 714 527 25 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 50 0 150 - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 20 47 62 776 573 27 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1487 587 600 0 - 0 Stage 1 587 - - - - - Stage 2 900 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 137 510 977 - - - Stage 1 556 - - - - - Stage 2 397 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 128 510 977 - - - Mov Cap-2 Maneuver 128 - - - - - Stage 1 521 - - - - - Stage 2 397 - - - - - Approach EB NB SB HCM Control Delay, s 20.3 0.7 0 HCM LOS C Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR Capacity (veh/h) 977 - 128 510 - - HCM Lane V/C Ratio 0.063 - 0.153 0.092 - - HCM Control Delay (s) 8.9 - 38.1 12.8 - - HCM Lane LOS A - E B - - HCM 95th %tile Q(veh) 0.2 - 0.5 0.3 - - Page 185 of 205 HCM 6th Signalized Intersection Summary Barberville Road TIS 100: Fort Mill Highway & Barberville Road 2026 Build PM RKA Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 477 865 0 0 749 262 1 0 0 435 0 266 Future Volume (veh/h) 477 865 0 0 749 262 1 0 0 435 0 266 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847 Adj Flow Rate, veh/h 518 940 0 0 814 285 1 0 0 473 0 289 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 525 1247 0 0 590 860 4 0 0 421 0 374 Arrive On Green 0.24 0.62 0.00 0.00 0.33 0.33 0.00 0.00 0.00 0.24 0.00 0.24 Sat Flow, veh/h 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565 Grp Volume(v), veh/h 518 940 0 0 814 285 1 0 0 473 0 289 Grp Sat Flow(s),veh/h/ln 1931 2027 0 0 1776 1505 1856 0 0 1759 0 1565 Q Serve(g_s), s 28.3 39.9 0.0 0.0 39.8 12.0 0.1 0.0 0.0 28.7 0.0 20.7 Cycle Q Clear(g_c), s 28.3 39.9 0.0 0.0 39.8 12.0 0.1 0.0 0.0 28.7 0.0 20.7 Prop In Lane 1.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 525 1247 0 0 590 860 4 0 0 421 0 374 V/C Ratio(X) 0.99 0.75 0.00 0.00 1.38 0.33 0.25 0.00 0.00 1.12 0.00 0.77 Avail Cap(c_a), veh/h 525 1247 0 0 590 860 135 0 0 421 0 374 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 38.0 16.6 0.0 0.0 40.1 13.6 59.8 0.0 0.0 45.7 0.0 42.6 Incr Delay (d2), s/veh 35.7 4.2 0.0 0.0 181.7 1.0 28.9 0.0 0.0 82.3 0.0 9.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 19.9 17.7 0.0 0.0 46.2 6.8 0.1 0.0 0.0 21.8 0.0 8.8 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 73.7 20.8 0.0 0.0 221.7 14.6 88.7 0.0 0.0 127.9 0.0 52.2 LnGrp LOS E C A A F B F A A F A D Approach Vol, veh/h 1458 1099 1 762 Approach Delay, s/veh 39.6 168.0 88.7 99.2 Approach LOS D F F F Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 80.4 34.0 34.0 46.4 5.6 Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3 Max Green Setting (Gmax), s * 65 * 29 28.9 * 31 8.7 Max Q Clear Time (g_c+I1), s 41.9 30.7 30.3 41.8 2.1 Green Ext Time (p_c), s 16.2 0.0 0.0 0.0 0.0 Intersection Summary HCM 6th Ctrl Delay 95.8 HCM 6th LOS F Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Page 186 of 205 HCM 6th TWSC Barberville Road TIS 200: Barberville Road & Harbor Bay Drive 2026 Build PM RKA Synchro 11 Report Intersection Int Delay, s/veh 0.7 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 10 23 33 665 635 5 Future Vol, veh/h 10 23 33 665 635 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 11 25 36 723 690 5 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1488 693 695 0 - 0 Stage 1 693 - - - - - Stage 2 795 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 137 443 901 - - - Stage 1 496 - - - - - Stage 2 445 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 128 443 901 - - - Mov Cap-2 Maneuver 128 - - - - - Stage 1 463 - - - - - Stage 2 445 - - - - - Approach EB NB SB HCM Control Delay, s 21.5 0.4 0 HCM LOS C Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 901 - 254 - - HCM Lane V/C Ratio 0.04 - 0.141 - - HCM Control Delay (s) 9.2 0 21.5 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0.1 - 0.5 - - Page 187 of 205 HCM 6th TWSC Barberville Road TIS 300: Barberville Road & Site Access 2026 Build PM RKA Synchro 11 Report Intersection Int Delay, s/veh 2.5 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 35 81 73 663 625 32 Future Vol, veh/h 35 81 73 663 625 32 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 50 0 150 - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 38 88 79 721 679 35 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1576 697 714 0 - 0 Stage 1 697 - - - - - Stage 2 879 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 121 441 886 - - - Stage 1 494 - - - - - Stage 2 406 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 110 441 886 - - - Mov Cap-2 Maneuver 110 - - - - - Stage 1 450 - - - - - Stage 2 406 - - - - - Approach EB NB SB HCM Control Delay, s 26.9 0.9 0 HCM LOS D Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR Capacity (veh/h) 886 - 110 441 - - HCM Lane V/C Ratio 0.09 - 0.346 0.2 - - HCM Control Delay (s) 9.5 - 54.1 15.2 - - HCM Lane LOS A - F C - - HCM 95th %tile Q(veh) 0.3 - 1.4 0.7 - - Page 188 of 205 HCM 6th Signalized Intersection Summary Barberville Road TIS 100: Fort Mill Highway & Barberville Road 2026 Build Improved AM RKA Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 614 821 0 0 633 175 0 0 0 179 0 392 Future Volume (veh/h) 614 821 0 0 633 175 0 0 0 179 0 392 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847 Adj Flow Rate, veh/h 667 892 0 0 688 190 0 0 0 195 0 426 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 654 2452 0 0 1192 929 0 2 0 465 0 413 Arrive On Green 0.24 0.64 0.00 0.00 0.35 0.35 0.00 0.00 0.00 0.26 0.00 0.26 Sat Flow, veh/h 1931 3953 0 0 3463 1505 0 1949 0 1759 0 1565 Grp Volume(v), veh/h 667 892 0 0 688 190 0 0 0 195 0 426 Grp Sat Flow(s),veh/h/ln 1931 1926 0 0 1687 1505 0 1949 0 1759 0 1565 Q Serve(g_s), s 28.9 13.1 0.0 0.0 19.9 6.6 0.0 0.0 0.0 11.0 0.0 31.7 Cycle Q Clear(g_c), s 28.9 13.1 0.0 0.0 19.9 6.6 0.0 0.0 0.0 11.0 0.0 31.7 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 654 2452 0 0 1192 929 0 2 0 465 0 413 V/C Ratio(X) 1.02 0.36 0.00 0.00 0.58 0.20 0.00 0.00 0.00 0.42 0.00 1.03 Avail Cap(c_a), veh/h 654 2452 0 0 1192 929 0 141 0 465 0 413 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 25.7 10.3 0.0 0.0 31.5 10.0 0.0 0.0 0.0 36.5 0.0 44.2 Incr Delay (d2), s/veh 40.5 0.4 0.0 0.0 2.0 0.5 0.0 0.0 0.0 0.6 0.0 52.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 16.6 5.1 0.0 0.0 8.1 4.0 0.0 0.0 0.0 4.7 0.0 17.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 66.2 10.7 0.0 0.0 33.6 10.5 0.0 0.0 0.0 37.1 0.0 96.4 LnGrp LOS F B A A C B A A A D A F Approach Vol, veh/h 1559 878 0 621 Approach Delay, s/veh 34.5 28.6 0.0 77.8 Approach LOS C C E Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 83.0 37.0 34.0 49.0 0.0 Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3 Max Green Setting (Gmax), s * 62 * 32 28.9 * 28 8.7 Max Q Clear Time (g_c+I1), s 15.1 33.7 30.9 21.9 0.0 Green Ext Time (p_c), s 20.1 0.0 0.0 3.8 0.0 Intersection Summary HCM 6th Ctrl Delay 41.6 HCM 6th LOS D Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Page 189 of 205 HCM 6th Signalized Intersection Summary Barberville Road TIS 100: Fort Mill Highway & Barberville Road 2026 Build Improved PM RKA Synchro 11 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 477 865 0 0 749 262 1 0 0 435 0 266 Future Volume (veh/h) 477 865 0 0 749 262 1 0 0 435 0 266 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 2027 2027 2027 1776 1776 1776 1949 1949 1949 1847 1847 1847 Adj Flow Rate, veh/h 518 940 0 0 814 285 1 0 0 473 0 289 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 551 2274 0 0 1098 887 4 0 0 465 0 413 Arrive On Green 0.22 0.59 0.00 0.00 0.33 0.33 0.00 0.00 0.00 0.26 0.00 0.26 Sat Flow, veh/h 1931 3953 0 0 3463 1505 1856 0 0 1759 0 1565 Grp Volume(v), veh/h 518 940 0 0 814 285 1 0 0 473 0 289 Grp Sat Flow(s),veh/h/ln 1931 1926 0 0 1687 1505 1856 0 0 1759 0 1565 Q Serve(g_s), s 23.9 15.9 0.0 0.0 25.7 11.5 0.1 0.0 0.0 31.7 0.0 20.0 Cycle Q Clear(g_c), s 23.9 15.9 0.0 0.0 25.7 11.5 0.1 0.0 0.0 31.7 0.0 20.0 Prop In Lane 1.00 0.00 0.00 1.00 1.00 0.00 1.00 1.00 Lane Grp Cap(c), veh/h 551 2274 0 0 1098 887 4 0 0 465 0 413 V/C Ratio(X) 0.94 0.41 0.00 0.00 0.74 0.32 0.25 0.00 0.00 1.02 0.00 0.70 Avail Cap(c_a), veh/h 587 2274 0 0 1098 887 135 0 0 465 0 413 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 0.00 0.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 29.7 13.3 0.0 0.0 36.0 12.5 59.8 0.0 0.0 44.2 0.0 39.8 Incr Delay (d2), s/veh 22.7 0.6 0.0 0.0 4.5 1.0 28.9 0.0 0.0 46.4 0.0 5.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 17.8 6.5 0.0 0.0 10.8 6.9 0.1 0.0 0.0 19.3 0.0 8.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 52.3 13.9 0.0 0.0 40.5 13.4 88.7 0.0 0.0 90.5 0.0 45.0 LnGrp LOS D B A A D B F A A F A D Approach Vol, veh/h 1458 1099 1 762 Approach Delay, s/veh 27.5 33.5 88.7 73.3 Approach LOS C C F E Timer - Assigned Phs 2 4 5 6 8 Phs Duration (G+Y+Rc), s 77.4 37.0 31.8 45.6 5.6 Change Period (Y+Rc), s * 6.6 * 5.3 5.1 * 6.6 5.3 Max Green Setting (Gmax), s * 62 * 32 28.9 * 28 8.7 Max Q Clear Time (g_c+I1), s 17.9 33.7 25.9 27.7 2.1 Green Ext Time (p_c), s 21.0 0.0 0.8 0.5 0.0 Intersection Summary HCM 6th Ctrl Delay 40.0 HCM 6th LOS D Notes * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. Page 190 of 205 Page 191 of 205 Page 192 of 205 Page 193 of 205 Page 194 of 205 Page 195 of 205 Page 196 of 205 Page 197 of 205 Page 198 of 205 Page 199 of 205 Page 200 of 205 Page 201 of 205 Page 202 of 205 Page 203 of 205 NEW ROAD NAMES: FEBRUARY 2026 GROUP SUBMITTAL The following road names have been submitted via Preliminary Plat and Civil Construction plans. All will be privately maintained. Road Name Development Redwood Dr Asbury Narrowleaf Dr Asbury Field Daisy Ln Asbury Silver Canoe Way Asbury Twinleaf Cir Asbury Alderwood Dr Asbury Blue Violet Ct Asbury Page 204 of 205 Agenda Item Summary Ordinance # / Resolution # : Contact Person / Sponsor: Department: Date Requested to Be on Agenda: 2/5/2026 Council Action Requested: Strategic Plan Focus Alignment: Points to Consider: Funding and Liability Factors: Recommendation: Attachments: None Page 205 of 205

Source: Lancaster County website. First collected Nov 3, 2026.