SPECIAL CITY COUNCIL
5:00 p.m., Thursday, December 11, 2014
1. Mayor Cronin called the meeting to order and acknowledged that the press and public
were duly notified of the meeting in accordance with the Freedom of Information Act. Attending
the meeting were Councilmembers Bettelli, Buckhannon, Carroll, Ferencz, Harrington, Loftus
and Ward and Mayor Cronin, as were City Administrator Tucker, Attorney Halversen, Assistant
City Administrator Dziuban and Clerk Copeland; the absence of Councilmember Bergwerf was
excused. A quorum was present to conduct business.
2. Purpose
Consideration of Change Order to R.B. Baker, a Division of Reeves, relative to the Shoal
Management Contract
Mayor Cronin explained that this meeting was called to avoid losing time or stepping down the
work on the renourishment project and possibly saving the City money. The key element of the
modification of the contract with Baker is to move the harvest area to the shoal, which will
provide more sand. This move could allow the project to move the permitted total of two
hundred fifty thousand cubic yards (250,000 cu. yd.) of sand.
Steven Traynum and Luke Finnaker of Coastal Sc ience and Engineering (CSE) explained that
the data along the bottom of the map was water levels, directions to the site, coordinate
controls, and the volumes of sand to be taken from each borrow site.
Councilmember Carroll asked whether the material to be covered in the Executive Session
would have any impact on the vote for this change order.
Administrator Tucker stated that she did not want Council to hear the Executive Session and to
indicate that having the information before a vote would have influenced their decision; she
suggested that she and Mr. Traynum present the open session information before the Executive
Session. Council could delay the motion and action until after the Executive Session.
The Administrator asked Mr. Traynum to review the project as it was originally conceived, what
the City is trying to do now and why it could not have been done before now.
After the 2008 project, the City knew that, as part of the Beach Management Plan, it wanted to
have the ability to manage the section of beach that is impacted by the inlet, i.e. 53
rd Avenue to
where the shoreline moves into Dewees Inlet. A plan to do that was included in the Beach
Management Plan as one (1) of the two (2) primary options for managing the beach; first was
off-shore sand renourishment projects and the second was shoal manipulation which included
managing the beach and the condition of the beach in that dynamic area. From the beginning,
the source of sand coming to the island caused the long-term accretions as shoals come off the
Inlet and slowly attach to the beach and spread out.
In 2010, the City realized that the area around Ocean Club was a hot-spot, and CSE began the
permit process to allow for the manipulation of the sand along this stretch of shoreline. The
permit allowed for the removal or placement of sand anywhere from 53
rd Avenue and the groin
near the 17th tee of the Ocean Course.
Special City Council
December 11, 2014
Page 2 of 6
Having studied the historical changes of the beach and found that the shoals come ashore at
different locations, CSE was not able to say that one (1) area was always going to be the
borrow area and another area was always going to need sand. The City and CSE wanted the
flexibility on time and space to look at a situation and work with the shoals as they come ashore.
The ideal situation would be to have enough sand everywhere so that as soon as a shoal
started to attach to the beach; if there was an erosional area, contractors could get onto the
shoal and take that sand to renourish the problem area – basically doing nature’s work for it.
According to Mr. Traynum, the situation for this project was that the shoal was not, and has not,
yet attached to the beach. When CSE started this project, the contractor indicated that he was
not comfortable getting his equipment onto the shoal, so the City wanted to do the project as
they had in 2012 that dealt with a smaller event, i.e. take sand from the beach to the erosional
area at Ocean Club.
The difference between the 2012 project and this one are that the erosion at Ocean Club is
more
severe, as is the erosion at Beachwood East and Dunescrest Lane and eventually down to
Grand Pavilion. The erosional areas on the beach were worse than they were in 2012 and
required a much larger project in order to restore the sand deficits in those areas. Mr. Traynum
explained that the permit only allowed for work during the winter months, so there must be
enough sand in front of those properties at the end of the winter to last throughout the summer.
The present configuration of the shoal is causing the erosion in the affected areas; the problem
is not the lack of sand. The presence of the shoal has changed the wave problems leading to
the erosion.
The 2012 project moved approximately ninety thousand (90,000) cubic yards of sand, and the
sand did not last through the summer. Eventually, Ocean Club had to place sand bags
because, between 2012 and 2013, there was no sand to borrow; the 2012 project allowed for
sand to be taken from the back side of a shoal that had already attached.
In 2013, there was still no sand to borrow, but a shoal had formed that would eventually attach,
but the timing was impossible to predict; based on the rate, the City and CSE anticipated a
project in late 2014 when the shoal was expected to attach.
At present so much sand has built up on the shoal that it was just piling higher and higher on the
shoal and making a bigger break-water; as the sand got higher, waves did not overtop it as
much and slowed the attachment process. The shoal was attaching quickly until the sand
started to build up behind it, slowing down the l eading edge of the shoal. Due to the amount of
sand building up on the shoal, the project could borrow from there; since the beginning of the
project, the contractor has become confident that the equipment can safely get to and from the
shoal.
Mr. Traynum explained that the reason for using the two (2) borrow sites was the need for a
much larger project due to the two (2) erosional areas; CSE surveyed and calculated the
amount of sand on the beach in areas similar to those borrowed from for the 2012 project. The
areas of the beach to be used were near Property Owners Beach House, Beach Club Villas,
Mariners Walk
and the condominiums; there was approximately eighty thousand (80,000) cubic yards of sand
on the beach in September 2014 in those areas. This quantity was insufficient to restore the
sand
Special City Council
December 11, 2014
Page 3 of 6
bags and the sand deficits at both locations; therefore, more sand had to be located. The
permit allows the City to borrow sand from an area of the beach that is healthy and is expected
to remain healthy; the beach from 53
rd to 56th Avenues was deemed to match that criteria. Sand
from this area was placed in the Beachwood East location with the knowledge that the sand
would eventually migrate back down to the borrow site. Mr. Traynum reported that the available
sand between 53
rd and 56 th Avenues has been harvested and placed at Beachwood East.
Available sand remains nearer 53rd Avenue, but the contractor has tried to minimize the removal
of addi-tional sand from there.
The erosion problem exists because of the shoal off-shore changing the wave patterns.
Modifying the contract for the contractor to harvest sand from the shoal would solve the sand
deficit problem because the sand is being used to renourish the beach and reduce the break-
water effect of the shoal. The contract modification would give the contractor permission to go
onto the shoal to harvest sand so that it will renourish the beach and reduce the erosion
problem.
Mr. Traynum stated that the shoal has a lot of sand and he could not guarantee that anything
done in excess of the two hundred fifty thousand (250,000) cubic yards would completely
eliminate the erosion through the entire summer.
Mayor Cronin inquired if the contractor intended to build a bridge to the shoal; Mr. Traynum
responded that, at low tide, there is a spit of the shoal that has nearly attached itself to the
beach just off Mariners Walk. He continued that the contractor would link that spit at a similar
elevation to the shoal, building a feature similar to the spit to the beach to get equipment to the
shoal.
The Mayor asked if this pathway would affect the hours of operation; he thought the contractor
was being limited.
Mr. Traynum agreed that the hours would change, but they were expecting a reduction since
they have already harvested the sand that can be harvested at high tide. He expects the
contractor to work four to five (4-5) hours a day.
The Mayor also noted that there is a difference in the cost per cubic yard they will need more
equipment, have fewer hours to work and have a slightly longer haul distance.
Councilmember Carroll inquired about the distance to the shoal at low tide and was told the
distance was about two hundred (200) feet. A dditionally, the Councilmember asked how long
the sand bridge would last as tides come in and go out.
Mr. Traynum explained that the shoal is trying to create a pond and trying to make that
connection for it; by building that connection for the shoal, they would not be constructing
something that the waves would contradict. He agreed that it would have to be maintained, but
it would not disappear because there is not a channel running through it.
The bridge would be on the north end of the shoal. By taking sand from the shoal, the height
would be lowered allowing the waves to push more sand on shore.
Mayor Cronin inquired whether this change order would mean that the contractor will work as
long as necessary to get the additional one hundred twenty-five thousand (125,000) cubic
yards. Mr.
Special City Council
December 11, 2014
Page 4 of 6
Traynhan was confident that the quantity of sand is available on the shoal, but, if for some
reason that is not the case, the contractor will return for a small mobilization for early 2015. Mr.
Traynum commented that the second mobilization was in the contract because CSE thought the
contractor would have two (2) crews on the worksite.
Based on the way the project is holding up, Mr. Traynum stated that, until the project has been
completed, he was not optimistic that it would be safe to say that the project can be left for a
month without maintenance. That is another reason for taking sand from the shoal to reduce
the erosion it is causing.
Councilmember Ward asked to review the costs for this project and where the funds came from
to do the project.
Administrator Tucker referred to the project schedule and reported that the City contributed two
hundred thousand dollars ($200,000) toward the project in the FY15 budget. The private stake-
holders that contributed were Lowe Wild Dune Investors, the Wild Dunes Community
Association, each of the condos affected going down the beach from Ocean Club, and the
individual homeowners at Beach Club, Beachwood East and Dunecrest that affront the beach.
The funding breakdown was as follows:
Residual from the 2008 Project $664,054
FY15 City Contribution 200,000
Private Contributions 423,074
Interest Earned 29
The City’s contribution came from accommodations taxes; no property tax dollars were
expended for the project.
Responding to Councilmember Ward, the Administrator noted that the remaining balance after
this project has been completed would be fifty-two thousand one hundred fourteen dollars
($52,114); the net effect of the change order, if approved, would be one hundred thirty-two
thousand dollars ($132,000). The original amount budgeted for the project was one million two
hundred sixty-five thousand dollars ($1,265,000).
Councilmember Ward noted that the project is under-budget.
Mayor Cronin asked whether the counters would continue to be needed, and the Administrator
said that they would. According to the Administrator, truck counting is being handled by City
employees, whose time is charged to the proj ect. The City’s counts are reconciled to the
contractor’s counts to verify the volume of sand moved.
Councilmember Ferencz inquired about why the City started the project before the shoal was
close enough to use it. Mr. Traynum answered that the condition of the beach determined the
start date; the beach could not wait much longer to get added quantities of sand.
Responding to Councilmember Ferencz, Mr. Traynum reported that approximately seventy (70)
cubic feet of sand has been moved into the erosion area, but much more is needed.
Special City Council
December 11, 2014
Page 5 of 6
Councilmember Carroll said that he wanted the stakeholders to be present because he was
concerned that the sand he saw on November 29
th had disappeared; he is concerned about
how long the project will last. He commented that, when the City is out of money, it is out of
money, and will have to go back to the stakeholders.
Mr. Traynum reported that Ocean Club anticipates quick erosion and has begun to get its
emergency measures lined up in case that happens. He reiterated that the shoal is
exacerbating the focused erosion so the plan is to get the shoal closer to shore and to push the
sand off the shoal will help to reduce that effect.
Mayor Cronin stated that the island will always experience erosion; that has been the history of
the island forever.
When Councilmember Loftus asked where the sand would be taken from the shoal, and he was
told that the sand would be taken from the side closest to the ocean. Mr. Traynum stated that,
when this project has been completed and has been able to get the full amount from the shoal,
if there is still sand and money available, it would make sense to move more sand off the shoal.
Councilmember Buckhannon asked from where the sand would come to build the bridge, and
Mr. Traynum said behind the shoal would be used for an initial build, but they will use sand from
the shoal to maintain the bridge.
Councilmember Buckhannon asked what percentage of the sand moved has come from the
area between 53
rd and 56th Avenues; having not recorded the amount moved in the last two (2)
days, he speculated that the amount is approximat ely thirty thousand (30,000) cubic yards, but
is probably thirty-five to thirty-six thousand (35,000-36,000) cubic yards now.
Councilmember Ferencz asked why the bridge was not constructed when the project began; Mr.
Traynum stated that the contractor did not want to do it in the beginning due to concerns about
the equipment; he noted that, since the project started, the size and elevation of the shoal have
increased.
Councilmember Carroll asked how the bridge would affect the beach to the south; Mr. Traynum
answered that the bridge would affect the beach below shoal; the bridge cannot be compared to
a groin because a groin traps sand that is moving along the shore.
Councilmember Carroll asked how much work time would be necessary to maintain the bridge
when the work day will be shortened anyway. Mr. Traynum stated that he thought the main-
tenance time would be minimal.
3. Executive Session to receive legal advice for a potential claim related to the Shoal
Management Project
MOTION: Councilmember Carroll moved go into Executive Session for the
reason stated above at 5:40 p.m.; Councilmember Loftus seconded and the
motion PASSED UNANIMOUSLY.
Special City Council
December 11, 2014
Page 6 of 6
Council returned to regular session at 6:05 p.m. with Mayor Cronin announcing that no decision
and no vote had been taken while in Executive Session.
Motion: Councilmember Harrington moved to approve the Change Order for
R.B. Baker, a Division of Reeves; Councilmember Carroll seconded and the
motion PASSED on a vote of 7 to 1, with Councilmember Ferencz casting the nay
vote.
4. Adjourn
MOTION: Mayor Cronin moved to adjourn the meeting at 6:08 p.m.;
Councilmember Bettelli seconded and the motion PASSED UNANIMOUSLY.