ECONOMIC PLANNING &
DEVELOPMENT
COMMITTEE MEETING
MONDAY, MARCH 4, 2024 | 6 PM
4th Committee Meeting
The Committee will meet in Mauldin City Hall at 5 East
Butler Road in the Council Chambers
The meeting will be available remotely through Zoom. Please visit the City’s website
at https:// cityofmauldin.org/your-government/meeting-minutes-agendas/ to
access the meeting via audio and videoconferencing.
A quorum of Council will be present.
1
ECONOMIC PLANNING & DEVELOPMENT COMMITTEE MEETING
MARCH 4, 2024, 6PM
CITY HALL - COUNCIL CHAMBERS
Committee Members: Taft Matney (Chair), Mark Steenback and Jason Kraeling
1. Call to Order Chairperson Matney
2. Public Comment Chairperson Matney
3. Reading and Approval of Minutes
a.Economic Development Committee
Minutes January 2, 2024 [Pa ges 3-5]
Chai
rperson Matney
4. Reports or Communications from City Officers
a.Community Development Director J.R. Charles
Chairperson Matney
5. Unfinished Business
There is no unfinished business.
Chairperson Matney
6. New Business
a.City Center Village Master Plan [Pages 6-58]
7. Public Comment
8. Committee Concerns
9. Adjournment
Chairpe
rson Matney
Chairperson Matne y
Chairperson Matney
Chairperson Matney
2
ECONOMIC PLANNING & DEVELOPMENT COMMITTEE MEETING
JANUARY 2, 2024, 6PM
CITY HALL - COUNCIL CHAMBERS
5 E. BUTLER ROAD
5th commitee mee�ng
Co
mmitee Members present were Chairman Ta� Matney, Commitee members Mark
Steenback and Jason Kraeling.
Oth
ers present were Seth Duncan, City Administrator. Community Development Director J.R.
Charles was not present.
1.
Call to Order- Chairman Matney
2. Public Comment- None
3. Reading and Approval of Minutes
a. Economic Development Commitee Minutes September 5, 2023
M
o�on: Councilman Kraeling made a mo�on to approve the minutes as submited with
Councilman Steenback seconding.
Vo
te: The vote was unanimous (3-0).
4. Re
ports or Communica�ons from City Officers
a. Community Development Director J.R. Charles
Mr
. Seth Duncan was present to give the report.
C
ultural Center Report – Safety & Security Capital Improvement
Plan
As
part of the FY2024 budget, the City Council approved a capital outlay of $325,000 to
improve security & safety at the Cultural Center Building in order to ensure the safety,
security, and well-being of guests that visit the Mauldin Cultural Center. Staff plans to
priori�ze Electrical Upgrades, Interior/Exterior Door Security, Exterior Ligh�ng, and Front
Step Removal/Reinstall for the FY 2024 budget. Other projects such as Fire Alarms,
Interior Ligh�ng, and Wi-Fi Cabling could likely be pushed into a future capital
improvements request.
Th
e total cost for the projects presented is iden�fied as $353,758.63, which is $28,758.63
over the Safety & Security line-item budgeted. The exterior Electrical Upgrades account
for the bulk of the planned expenses. However, both the Community Development
Department and Public Works Department agree that the electrical system in the
amphitheater area must be updated in order to prevent overloads to the system, and to
ensure con�nued use of outdoor spaces for Sooie and other ac�vi�es.
3
In order to accomplish as many safety/security projects as possible, staff has priori�zed
Electrical Upgrades, Interior/Exterior Door Security, Exterior Ligh�ng, and Front Step
Removal/Reinstall. Projects such as Fire Alarms, Interior Ligh�ng, and Wi-Fi Cabling will be
delayed and completed as remaining funding allows. Any capital improvements not completed
with FY2024 funding, will be deferred un�l FY2025 or as future funding allows.
5. U
nfinished Business- There is no unfinished business.
6
. New Business
a. Cultural Center Front Steps Replacement
As part of the Safety & Security Capital Improvement plan for the MCC, staff solicited
quotes for the removal/replacement of the front steps of the MCC. Several people have
commented that the front steps are difficult to climb, uneven, and beginning to
deteriorate. Staff solicited quotes from construc�on companies and concrete contractors
for the removal/replacement of the MCC front steps.
In discussions with the different vendors, it was recommended that the stairs be
lengthened and widened in order to decrease the ascent angle of the staircase. This
would allow for easier pedestrian access due to the wider spacing of the staircase, and it
would improve safety by giving increased depth and a shallower rise for each step. Lights
would also be installed on the façade of the building, giving addi�onal ligh�ng for the
staircase.
Addi�onally, because the front entrance is a defining and forward-facing feature of the
building, the aesthe�cs of the staircase will be taken into considera�on with the overall
price of the improvement.
Mo�on: Councilman Kraeling made a mo�on to send the general design of the stairway
to Council with Councilman Steenback seconding.
Vote: The vote was unanimous (3-0).
b. Cultural Center Mural
The City Council authorized the expenditure of $5,000 from the Community
Development Department’s FY 2024 Adver�sing line item at its June 19, 2023, Council
Mee�ng.
A
t the October 16, 2023, Council Mee�ng, representa�ves of Leadership Golden Strip
gathered feedback from City Council on the design of the mural. The design included the
Council members feedback at that mee�ng, giving minor edits and sugges�ons to the
design of the mural.
4
The ar�s�c consultants have created a final dra� that included the sugges�ons from the
October 16, 2023, Council Mee�ng, and it has produced a final dra� for approval.
The mural proposed by Leadership Golden Strip will be a vinyl applica�on that will adhere to
the window covering. The vinyl applica�on is the preferred method of produc�on because it
can be easily applied and/or removed, and its removal will not damage the structure of the
building.
Mo�on: Councilman Steenback made a mo�on to send the final dra� of the mural
to Council with Councilman Kraeling seconding.
Vote: The vote was unanimous (3-0).
7. Pu
blic Comment- None
8.
Commitee Concerns- None
9. A
djournment- Chairman Matney adjourned the mee�ng at 7:21 p.m.
Re
spec�ully Submited,
Cindy Miller
Municipal Clerk
5
MEETING DATE: March 4, 2024
AG
ENDA ITEM: 6a
TO
: Economic Planning and D evelopment Committee
FROM: J.R. Charles, Community Development Director
SUBJECT: City Center Village Master Plan - Consultant Recommendation
REQUEST
Award a contract to Seamon Whiteside for the creation of the City Center Village Master Plan as funded
by the MASC Hometown Economic Development grant , and authorize a total expenditure not to exceed
$33,000 for the project.
HISTORY/BACKGROUND
At its August 21, 2023, meeting, the Mauldin City Council approved a resolution supporting an application
for the Hometown Economic Development Grant with the Municipal Association of South Carolina. The
application was for the creation of a new City Center Village Master Plan in light of recent developments
in the City Center Village area. The MASC Hometown Economic Development Grant requires a 15-percent
match ($3,750 for the $25,000 grant) producing a total allocation of $28,750 approved by Council on
August 21, 2023.
S
taff was notified of its successful award from MASC October 2023. Staff then issued an RFP to solicit
proposals from consultants for professional services. Three firms provided proposals in response to the RFP
including MRB Group, Seamon Whiteside, and Agora Partners. Staff then interviewed the top two firms .
Staff listened to each firm’s process, experience, and qualifications, and better defined the proposed scope
of work. The two firms were then provided additional time to revise their submittal based on the refined
scope of work. The firm’s revised cost estimate to complete the project is as follows:
S
eamon Whiteside $30,000
Agora Partners $40,000 + $2,900 in reimbursable expenses
ANALYSIS or STAFF FINDINGS
Upon final examination of the two finalist firms, Seamon Whiteside’s proposal was found to be the best
value to the City for the scope of work defined by the grant. Moreover, in speaking with their team about
the incidental cost schedule, the Seamon Whiteside representative said they feel comfortable accomplishing
the scope of work within the $30,000 proposal . However, staff believes that a small contingency is
necessary to anticipate reimbursable costs that may be necessary. Staff recommends a $3,000 contingency
for this project and asks Council to set the “Not to Exceed” at $33,000 for this project.
FINANCIAL IMPACT
Funding for this project will be allocated from a number of sources and include the following:
MASC HED Grant $25,000
Local Match + Contingency $8,000 includes minimum match of $3,750
$33,000.00
6
Staff recommends allocating $8,000 from the Community Development Special Projects line item to fund
the local match and contingency.
RECOMMENDATION
Staff recommends awarding Seamon Whiteside with a contract for the creation of the City Center Village
Master Plan, and authorize a total expenditure not to exceed $33,000 for the project.
ATTACHMENTS
• Proposal from Seamon Whiteside for the creation of a City Center Village Master Plan
7
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
Judson Mills Building 6000, Suite 6060, 701 Easley Bridge Road, Greenville, SC 29611
seamonwhiteside.com
STATEMENT OF QUALIFICATIONS
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
DECEMBER 13, 2023
POINT-OF-CONTACT:
CHIP BUCHANAN, PE, SENIOR TEAM LEADER
864-298-0534
CBUCHANAN@SEAMONWHITESIDE.COM
8
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
2
Cover Letter pg 3
Executive Summary pg 5
Statement of Work pg 11
Engagement pg 13
Relevant Projects pg 15
Qualifications & Experience pg 33
Costs pg 40
T ABLE OF CONTENTS
9
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
3
December 13, 2023
Mr. J.R. Charles
City of Mauldin
5 E. Butler Road
Mauldin, South Carolina 29662
Request for Proposal
Mauldin City Center Village Master Plan
City of Mauldin
Dear Mr. Charles,
Seamon Whiteside (SW+) is pleased to submit our statement of qualifications and proposal for your
consideration in selecting a team to provide Master Planning Services related to the City Center Village .
Founded in 1985 by a landscape architect and a civil engineer, SW+’s foundational focus lies in providing
comprehensive land development services that integrate visionary land planning with stormwater, geometric
design, and utility engineering expertise. Our focus has evolved into a commitment to elevating the site
design experience by understanding your vision, designing creative solutions, fostering a highly collaborative
environment throughout the process, and having pride in the places and communities we help design and
develop.
SW+ has significant experience with due diligence, site evaluation, master planning, and design of large- and
small-scale urban communities for both public and private sector clients, including stakeholders throughout
the Upstate such as the City of Mauldin, City of Seneca, and City of Greenville. From mixed-use projects such
as Pinestone to urban redevelopment projects like District 356 & .408 Jackson, the SW+ team understands
the positive impact that high-density urban development will have in a community.
Supplementing SW+’s expertise for this SOQ is a professional partner we have teamed with on similar projects in
the past. McMillan Pazdan Smith Architects (MPS) brings a vision for Architecture & Mixed Use Development.
A detailed breakdown of our team and a comprehensive listing of projects with scope elements and tasks
similar to those required in this RFP are included in this SOQ and our team looks forward to discussing those
projects and our approach with you and your Selection Committee. Coupled with SW+’s partnership history
with City of Mauldin stakeholders, our team endeavors to leverage our expertise to successfully deliver the
requested due diligence and planning studies. We look forward to the opportunity to help you envision your
future City Center Village and how it will enhance and further catalyze the development of the City.
COVER LETTER
10
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
4
The Point-of-Contact for this project is Chip Buchanan, PE, Senior Civil Engineering Team Leader of
SeamonWhiteside. Thank you for considering the SW+ team!
SEAMON, WHITESIDE & ASSOCIATES, INC.
Joe Bryant, PE, Executive VP, Managing Principal
701 Easley Bridge Rd, Suite 6060
Greenville, SC 29611
864-298-0534
jbryant@seamonwhiteside.com
Primary Point-of-Contact:
Chip Buchanan, PE, Senior Team Leader
701 Easley Bridge Rd, Suite 6060
Greenville, SC 29611
864-298-0534
cbuchanan@seamonwhiteside.com
SW+ is licensed in the state of SC:
Engineering #472 | Exp. 03/31/2025
Landscape Architect #32 | Exp. 01/31/2025
Land Surveying #472 | Exp. 03/31/2025
COVER LETTER
11
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
5
ABOUT SEAMONWHITESIDE
SeamonWhiteside (SW+) is a full-service land design firm founded in
1985. SW+ provides comprehensive services tailored to the needs
of each project for the purpose of facilitating its planning, design and
construction.
COMPANY STATEMENT
With the goal of being the best design firm in the region, the SW+
leadership team continues to attract the brightest talent, each with a
unique expertise in one of the many facets of land design. Now with offices
in Mount Pleasant, Greenville, Summerville, and Spartanburg, SC as well
as Charlotte, NC, SW+ inspires employees to stand behind its tagline,
elevating the site design experience. We’ve worked hard to position SW+
as a leader of environmentally conscious, low-impact advancements in
engineering and site design. We blend Civil Engineering & Landscape
Architecture to create holistic environments for people. When it comes to
being sustainable, we strive to leave our mark by making the exception to
the convention, and making the conventional truly exceptional.
OUR GREENVILLE, SC LOCATION
SW+ Greenville engineers and landscape architects work with owners,
consultants, permitting agencies, regulatory staffs, and subcontracted
firms to achieve the best outcome possible. The hallmark of our
approach to project management and client success is vigorous
review of all deliverables, collaborative communications, and active
participation in all aspects of the project regardless of its complexity,
challenges, or size. Our Greenville team is comprised of experienced
SW+ civil engineers and landscape architects who are knowledgeable
about our practices, our products, and our process, and are committed
to providing top-notch planning, design, engineering, and client services
to the Upstate region.
EXECUTIVE SUMMARY
12
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
6
MOUNT PLEASANT OFFICE
*SW+ CORPORATE HEADQUARTERS
501 Wando Park Boulevard, Suite 200
Mount Pleasant, SC 29464
Tel: (843) 884-1667
GREENVILLE OFFICE
Judson Mills Building 6000, Suite 6060
701 Easley Bridge Road
Greenville, South Carolina 29611
Tel: (864) 298-0534
SUMMERVILLE OFFICE
712 N Cedar Street
Summerville, SC 29483
Tel: (843) 972-0710
SPARTANBURG OFFICE
104 N Daniel Morgan Avenue, Suite 300
Spartanburg, SC 29306
Tel: (864) 272-1272
CHARLOTTE OFFICE
230 E Peterson Drive, Suite B
Charlotte, NC 28217
Tel: (980) 312-5450
ESTABLISHED
1985
FOUNDERS
Kenny Seamon, FASLA & Stuart Whiteside, PE
LEADERSHIP
Russ Seamon, ASLA, LEED AP, President
Joe Bryant, PE, MCE, LEED AP, Executive Vice President
Gary Collins, PLA, Vice President
Jason Munday, PE, Vice President
William O’Neal, PE, LEED AP, Vice President
Stuart Whiteside, PE, Principal-In-Charge
EMPLOYEES
170+
DESCRIPTION
SeamonWhiteside (SW+) is a full-service land design firm providing
Civil Engineering, Landscape Architecture, Master Planning, Water
Resources Engineering, Public Engagement, Urban Planning,
Land Planning, Industrial services to public and private clients
throughout the Southeast. SW+ provides comprehensive services
tailored to the needs of each project for the purpose of facilitating
the planning, design and construction.
CLIENT TYPES
Commercial, Retail, Office Buildings, Business Parks, Industrial and
Commerce Parks, Higher Education and Corporate Campus, Single
and Multi-Family Residential, Parks and Recreation, Mixed Use,
Urban Design, Municipal Improvements, Streetscapes, Roadway
Design
SERVICES
Civil Engineering, Landscape Architecture, Master Planning, Water
Resources Engineering, Public Engagement, Urban Planning, Land
Planning, Industrial
WEBSITE
www.seamonwhiteside.com
EXECUTIVE SUMMARY
13
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
7
EXECUTIVE SUMMARY
Canvas Greenville, Greenville, SC Courier Square , Charleston, SC
■ County Square Redevelopment
GREENVILLE, SC
■ Canvas Greenville
GREENVILLE, SC
■ Judson Mill Redevelopment
GREENVILLE, SC
■ Main and Stone
GREENVILLE, SC
■ 408 Jackson &
Shoeless Joe Jackson Museum
GREENVILLE, SC
■ The McClaren West End
GREENVILLE, SC
■ Lewis Plaza Redevelopment
GREENVILLE, SC
■ Buncombe Street Mixed Use
GREENVILLE, SC
■ Hampton Station Mixed Use
Master Plan
GREENVILLE, SC
■ Laurens Road Mixed Use
& Basin 15 Upgrades
GREENVILLE, SC
■ Hartwell Villiage Mixed Use
OCONEE COUNTY, SC
■ Pinestone Mixed Use
TRAVELERS REST, SC
■ Westone Redevelopment
GREENVILLE, SC
■ Pendleton West Mixed Use
GREENVILLE, SC
■ Indigo Square Mixed Use
MOUNT PLEASANT, SC
■ Nexton Mixed Use Master Plan
SUMMERVILLE, SC
■ Belle Hall Mixed Use
MOUNT PLEASANT, SC
■ Mixson Mixed Use
NORTH CHARLESTON, SC
■ Brookland Mixed Use
WEST COLUMBIA, SC
■ Caleb’s Creek Mixed Use
KERNERSVILLE, NC
■ Cargill Place Master Plan
HARTSVILLE, SC
■ City of Clemson
U Center on College Avenue
CLEMSON, SC
■ Courier Square Mixed Use
CHARLESTON, SC
■ Dave Lyle Boulevard Mixed Use
ROCK HILL, SC
■ East Central Lofts
CHARLESTON, SC
■ Elan Midtown Mixed Use
CHARLESTON, SC
■ Long Savannah Mixed Use
CHARLESTON, SC
■ Morrison Yard Mixed Use
CHARLESTON, SC
■ Pacific Box & Crate Mixed Use
CHARLESTON, SC
■ Shelmore Village Mixed Use
MOUNT PLEASANT, SC
■ The Boulevard Mixed Use
MOUNT PLEASANT, SC
■ The Porter at 577 Meeting Street
CHARLESTON, SC
MIXED USE EXPERIENCE
SeamonWhiteside has been providing comprehensive master planning, civil engineering, landscape architectural
services for large scale mixed use developments for more than three decades throughout the Southeast.
14
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
8
EXECUTIVE SUMMARY
M
cMillan Pazdan Smith is a regional, practice-based architecture,
planning, and interior design firm. Our purpose is to create meaningful
and lasting impact for the good of all. We work to design a better
future through thoughtful, creative, and purpose-driven solutions.
We are in service to each other, our clients, and our communities. Serving
with integrity has always been at the heart of who we are and what we design.
Many projects stem from repeat clients, a testament to our focus on design
excellence and service to manage your unique needs.
Through our collaborative culture, creativity, and innovative design
solutions, we enjoy a diverse clientele and portfolio of complex, sophisticated
projects that have received local, regional, and national recognition.
Practicing since 1955, our firm currently has offices throughout the Southeast
in Charleston, Columbia, Greenville, and Spartanburg, SC; Asheville and
Charlotte, NC; and Atlanta, GA.
FIRM OVERVIEW
MCMILLAN PAZDAN SMITH
– Anthony Tiritilli, Partner
three corners development
(judson mill )
“ The majority of my development
experience had been in
Chicago, where we are
surrounded by world class
architectural firms. As such,
when I came into the Greenville
Market I was a little skeptical as
to the caliber of design firms that
we would have at our disposal.
Luckily, we found MPS. We
threw an extremely complicated
asset at you guys and you
handled every aspect with the
utmost professionalism and
the depth of your “bench” is
more than impressive. When we
got into the ridiculously complex
apartment component… you
guys hit it out of the park.”
15
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
9
EXECUTIVE SUMMARY
HOUSING / MIXED-USE DESIGN
• JUDSON MILL / MIXED-USE
Renovated 800,000 SF Textile Mill into 204
HUD apartments, 215,000 SF Office Space,
106,000 SF Industrial, 35,000 SF Flex Space,
and 12 Acres Retail Parcels; Judson, SC
• BRUTONTOWN
Master Planning, Community Meetings,
Pedestrian Studies, and Revitalization of
Historic African-American Neighborhood;
Affordable Housing; Greenville, SC
• COMMONS AT HAMPTON-PINCKNEY
Historic Multi-Family Townhomes; 3 buildings
each with 5 townhomes; Greenville, SC
• COURTVIEW TOWNHOMES
15 Transitional Craftsman Style Multi-Family
Townhomes overlooking 160-acre Mayberry
Park; 3-story units offer 1,700 to 2,400 SF;
Greenville, SC
• LANEY WALKER / BETHLEHEM
Master Planning + Design of Specific
Projects for 1,200-Acre Historic District
Adjacent to Downtown; Augusta, GA
• MULBERRY-PINCKNEY NEIGHBORHOOD
Master Planning, Community Meetings,
Pedestrian Studies, and Revitalization of
Historic Single + Multi-Family Neighborhood;
Greenville, SC
• THE PRESERVE AT LOGAN PARK
New, 4-story 114,000 SF, 113-unit building;
Renovation of 5-story, 68,000 SF, 80-unit
Garden Apartments; Affordable + Senior
Housing; Greenville, SC
• WILLIAMS TERRACE SENIOR LIVING
New, 4-story, 55-unit building with Ground-
floor Parking, Rooftop Community Room
+ Terrace; Affordable Senior Housing;
Charleston, SC
• 400 MEETING STREET APARTMENTS
New, 4-story, 62,385 SF, 41-unit building
with two architectural styles to blend with
the surrounding neighborhoods on opposite
streets; Charleston, SC
• 100 EAST APARTMENTS / MIXED-USE
New, 7-story, 54,651 TSF, 48-unit building
above Ground-floor of 8,757 SF Retail /
Office; Design-Build; Greenville, SC
• MAIN + STONE / MIXED-USE
New, 4-story, 225-unit efficiency apartments
above 21,000 SF of Retail Space; Includes
Pool, Parking Deck, Amenity Space / Club
House, and Fitness Facilities; Greenville, SC
• MCBEE STATION / MIXED-USE
14-Acre Site transformed into two
city blocks of Commercial Space and
Apartments / Condominiums and Parking
Structure; Greenville, SC
As a community-focused design practice, McMillan Pazdan Smith understands that the well-being of communities is predicated
on the vitality, connectivity, and sustainability provided by the integration of workplace, residential, and recreational spaces. Our firm
has participated in master planning and design efforts to create mixed-use communities that represent intelligent models for growth
including infill projects, adaptive re-use, and new construction. In addition to our multi-family living experience, our resume includes a
wide range of retail, dining, and entertainment clients including award-winning restaurants, music venues, breweries, and more.
100 EAST / MIXED USE
MIXED-USE
DESIGN
MCMILLAN PAZDAN SMITH
16
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
10
PROJECT APPROACH - MASTER PLANNING
We have successfully completed small and large scale
urban mixed-use master planning projects, infrastructure
improvements, established or expanded public facilities,
redesigned roadways and parking areas, and provided in-
depth value engineering and opinions of probable cost for a
variety of projects throughout the state and region.
SeamonWhiteside’s experienced technical staff works with
public and private clients in the Carolinas on a variety of
master planning projects that include community and regional
destinations, mixed-use development, entertainment venues,
active/passive parks, roadway/streetscape design, landscape
architecture design services, and stormwater improvements.
Our staff understands the needs of a community’s aging
infrastructure and capacity issues while handling growth.
EXPERIENCED PROJECT MANAGEMENT & LOCAL POINT -OF-CONT ACT
At SeamonWhiteside (SW+), we respond to our clients’ needs as they arise. Response time is always a
consideration for our clients and for our staff. Our team is led by our locally based SW+ Upstate offices and
ready to provide a prompt response to client requests, meetings, and site visits. Key personnel are registered
civil engineers and landscape architects well-versed in city, county, and state design criteria and procedures.
McMillan Pazdan Smith (MPS) will provide Architectural and Mixed-Use consulting services for the project.
Our firms and individual staff have completed numerous projects for public and private clients throughout
South Carolina similar to those anticipated for the City of Mauldin. Our team members each have significant
experience working in these project areas. SW+’s team, led by Chip Buchanan, PE, Senior Civil Engineering
Team Leader in our Upstate Greenville office, has significant experience working with local governmental
departments and stakeholder groups.
Our SW+ Greenville office is fully staffed with professional civil engineers and landscape architects who are
available to provide the required services in support of any client projects that may be assigned under the RFP
contract. Additional civil engineering and landscape architectural assets are available as needed from our five
offices which are all connected via virtual and telecommunications networks. Our staff expertise, along with
our proximity to the project, make SW+ and consultants the ideal team to support and guide the City in the
master planning process for this project.
EXECUTIVE SUMMARY
WAY
17
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
11
ST A TEMENT OF WORK
A V AILABILITY AND ABILITY TO MANAGE BUDGETS AND SCHEDULES
Our focus on quality client services and getting the project completed on time and within budget enables us
to maintain a growing list of repeat clients and a workload consisting of steady, organized growth. The SW+
team is committed to the production of a quality, well-designed project. Our staff has the availability to meet
project needs and client goals. We welcome the opportunity to interview with your selection committee and
look forward to sharing more of our master planning experience with you.
PROJECT UNDERST ANDING
With the desire to develop an urban mixed-use destination
for the residents and visitors alike, the City of Mauldin
is taking this opportunity to develop a thoughtful and
comprehensive Master Plan. Determining the viability of
certain aspects of a Master Plan from spatial, technical,
and economic viewpoints will allow the City team to
develop a strong vision for the City Center Village and
roadmap for its success.
The Master Plan will include the following Scope of Services:
• Task 1: Kickoff | Due Diligence
• Task 2: Market Review
• Task 3: Site Evaluation
• Task 4: Master Planning
18
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
12
ST A TEMENT OF WORK
ANTICIPA TED SCHEDULE
ADDITIONAL SERVICES
SW+ will provide design and engineering services for tasks identified by the client. Additional in-house services
that SW+ is prepared to provide if needed include Water Resources Engineers, LEED Certified Professionals,
ISA Certified Arborists, and FAA Licensed Remote Drone Pilots. SW+ will work with subconsultants for any
tasks that SW+ does not provide in-house, such as wetland delineation and traffic engineering.
TASK & FEE BUDGET WORKSHEET
City of Mauldin | MAULDIN CITY CENTER VILLAGE MASTER PLAN RFP
SeamonWhiteside+
January February March April May June
1 8 15 22 29 5 12 19 26 4 11 18 25 1 8 15 22 29 6 13 20 27 31 7 14 21 28
Site Assessment | Data Gathering
Market Review
Design | Engagement Meetings
Final Report
2024
12/13/23
19
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
13
ENGAGEMENT
SW+ MASTER PLANNING PHILOSOPHY & PROCESS
The following outlines how we will accomplish the following Tasks and Deliverables listed in the RFP following
the Main Street Four-Point Approach for the success of the project and delivering a Master Plan that is well-
designed, achievable, and provides much needed amenities for the community of Mauldin and beyond.
• Assessment of the Existing Planning Area
• Best Practices, Case Studies, and Similar Models
• Creation of a Master De velopment Plan for the Planning Area
• Public-Sector Suppor t Strategy
• Methodologies for Implementing the Development of the Planning Area
Our approach to Master Planning is really quite simple. We believe that great design boils down to two essential
tasks: 1. Find a way to preserve and protect everything that really matters; and 2. Develop the vision and tools
needed to replace the stuff that doesn’t matter with things that will.
Our approach is also based on a rigorous, inclusive process where key stakeholders are an important part of
the solution: creating their own future. We recognize that solution.
Along with City staff, the residents and business owners will be valued partners with whom we will
collaborate and seek advice. These individuals, along with others as discovered through the Master Planning
Process, will be key partners as we develop the Master Plan.
The SW+ team always seeks to be fresh and innovative by using a process that is very collaborative, transparent,
and interactive. This process, simply referred to as the SW+ PROCESS, includes the phases of the creative
master planning experience: Understand, Explore, and Solve.
Understand (PRE-CHARRETTE) Stakeholder Engagement Meeting #1
First, we research, observe, question, analyze, investigate, and listen. This is where “problem seeking” occurs.
We talk to staff, stakeholders, agencies, business owners, and others who will either influence or be influenced
by the project. This is where we begin to understand the culture, history, and values of the place. We need
to understand not only the City but its regional context. This is also the time for defining goals, programs, the
approval process, and timing issues.
20
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
14
Explore (CHARRETTE) Stakeholder Engagement Meeting #2
Next, we utilize the charrette to explore ideas. The pinnacle of the charrette is the stakeholder workshop where
they are invited to participate in the planning process. Then we develop our “big idea” statement and begin
brainstorming alternatives. Those ideas are evaluated and tested. Impacts of the ideas are tested based on
economic, social, and aesthetic attributes. Less ideal alternatives begin to be stripped away or morphed to
make them better. We talk a lot. We challenge, we question, we ask for feedback. We are almost ready to
decide.
Solve (POST-CHARRETTE) Stakeholder Engagement Meeting #3 | Consensus Plan
Finally, after identifying the real issues and solidifying the project goals, we begin to gravitate towards solutions.
We select, we prioritize, and we test. We revisit the goal statement to see if the plan rings true. We select
approaches that balance a broad vision with short-term reality. We judge whether the concepts will maintain
momentum for the City, whether they will be a catalyst for more change, and whether the ideas are sustainable
environmentally, socially, and economically. Then we document the findings in a way that makes the solutions
implementable.
Community Engagement happens online, in-person, and at networking events. We propose to partner with the
City on social media posts as well as creating a Story Map of the project to provide updates, mappings and
renderings to keep the community informed of our progress.
We work with key Consultants that share our belief that the client engagement process is based on a core
belief that a successful project is more than “brick and mortar.” It is your story, deeply understood, which
sparks us to create distinctive and purposeful spaces. Together, our architects, designers, and comprehensive
team bring proven expertise, powerful analytics, and simple listening to understand you, your staff and your
vision. This process leads to exceptional results and a sustainable, ever-lasting project.
ENGAGEMENT
21
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
15
PROJECTS & REFERENCES
Mauldin City Center Framework Plan
SW+ provided recreation master planning, urban design,
and grant funding assistance for the City of Mauldin’s
downtown. The project was performed in multiple phases
and the limits of each phase varied but generally included
the area bounded by Jenkins Street (West), N. Main Street
(South), Murray Drive (North), and E. Butler Road (East).
This project focused on creating the framework for future
City Center (Downtown) development by reimagining
the street network and other public spaces. The City
seeks to create an inviting downtown environment
through enhancements to the public realm including the
incorporation of on-street parking, landscaping and street
trees, pedestrian safety enhancements, and special
intersection treatments. Team: SW+
Pinestone Mixed-Use
SW+ provided master planning services for the
$100 million, 20 acre Pinestone Mixed Use
development located at the former Emb-Tex plant off
US 25 in Travelers Rest. Pinestone includes a mix of
townhomes, apartments, and single family houses,
as well as commercial and office space. Amenities
include a central park with greenway access to the
city’s revitalized Main Street, a dog park, bocci court,
clubhouse, outdoor fitness area, event garden, and a
pavilion. MPS provided architectural services for the
project.
Team: SW+, MPS
.408 Jackson
.408 Jackson is a mixed-use, multi-family
development located in District 356 adjacent to
Fluor Field in Downtown Greenville’s Historic West
End. The project is located on 2.8 acres and includes
227 apartments and 4,700 SF of retail space. “.408”
refers to the 1911 batting average of baseball legend
Shoeless Joe Jackson, whose museum is included
in the development. Amenities include a dedicated
parking garage with ample onsite parking, 1,932 SF
of outdoor patio and green space, and close proximity
to Swamp Rabbit Trail. SW+ provided civil engineering
and landscape architecture design services to
include DRB approval, schematic design, design
development, civil site and landscape construction
documents, site work permit coordination, and
construction phase services.
Team: SW+
Reference:
City of Mauldin
Van Broad
Community Development Director
(retired)
5 East Butler Road
Mauldin, SC 29662
Reference:
Pinestone Capital LLC
Jimmy Wilson
100 Roe Road
Travelers Rest, SC 29690
(864) 430-7539
jimmywilson@pinestonecap.com
Reference:
Woodfield Development, LLC
Brian Schick
850 Morrison Drive, Suite 700
Charleston, SC 29403
(704) 506-4692
bschick@wfinvest.net
RELEV ANT PROJECTS
22
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
16
WAY
FRAMEWORK PLAN | CITY OF MAULDIN
SW+ provided recreation master planning, urban design, and
grant funding assistance for the City of Mauldin’s downtown. The
project was performed in multiple phases; the limits of each phase
varied but generally included the area bounded by Jenkins Street
(west), N. Main Street (south), Murray Drive (north), and E. Butler
Road (east). This project focused on creating the framework for
a future city center (downtown) development by reimagining the
street network and other public spaces. The city seeks to create
an inviting downtown environment through enhancements to the
public realm, including the incorporation of on-street parking,
landscaping and street trees, pedestrian safety enhancements,
and special intersection treatments.
Location
MAULDIN, SC
Project Type
MASTER PLANNING
URBAN PLANNING
Project Size
±45-ACRES
23
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
17
RELEV ANT PROJECTS
DISTRICT 356
(FORMERLY JACKSON WA Y)
The project is located on Field Street next to the Fluor Field
baseball stadium (Northern side) and the new 408 Jackson
apartments on the Southern side. The roadway and streetscape
is being completely reworked with new pavers on the road surface
as well as the sidewalks, new street trees, new street lights, new
public bathrooms and ticket office, and new hanging lights over
the road. The street can be closed down for special events and
baseball games. The project is creating a new district, hence the
name ‘District 356’. SW+ worked with the design team during a
multi-day charrette involving various stakeholders including Fluor
Field and the City of Greenville to create a masterplan and provide
design and engineering services for the project.
Location
GREENVILLE, SC
Project Type
STREETSCAPE
Project Size
680 LINEAR FEET
Completion Date
2022
24
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
18
RELEV ANT PROJECTS
.408 JACKSON
.408 Jackson is a mixed-use, multi-family development located
in District 356 adjacent to Fluor Field in Downtown Greenville’s
Historic West End. The project is located on 2.8 acres and includes
227 apartments and 4,700 SF of retail space. “.408” refers to the
1911 batting average of baseball legend Shoeless Joe Jackson,
whose museum is included in the development. Amenities include
a dedicated parking garage with ample onsite parking, 1,932 SF
of outdoor patio and green space, and close proximity to Swamp
Rabbit Trail. SW+ provided civil engineering and landscape
architecture design services to include DRB approval, schematic
design, design development, civil site and landscape construction
documents, site work permit coordination, and construction phase
services.
Location
GREENVILLE, SC
Project Type
MULTI-FAMILY | MIXED USE
Project Size
2.8 ACRES | 227 UNITS
Completion Date
2022
25
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
19
RELEV ANT PROJECTS
PINESTONE MIXED USE
SW+ provided master planning services for the $100 million, 20
acre Pinestone Mixed Use development located at the former Emb-
Tex plant off US 25 in Travelers Rest. Pinestone includes a mix
of townhomes, apartments, and single family houses, as well as
commercial and office space. Amenities include a central park with
greenway access to the city’s revitalized Main Street, a dog park,
bocci court, clubhouse, outdoor fitness area, event garden, and a
pavilion.
Location
TRAVELERS REST, SC
Project Type
MASTER PLAN
Project Size
20 ACRES
Completion Date
ACTIVE
26
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
20
RELEV ANT PROJECTS
CITY OF SENECA DOWNTOWN MASTER PLAN
SeamonWhiteside worked together with the architect and the City
of Seneca and shareholders to create a Downtown Master Plan that
focuses on the on the public realm with a series of pocket parks,
plazas and outdoor event spaces all connected with a widened and
enhanced streetscape.
Location
SENECA, SC
Project Type
MUNICIPAL | URBAN PLANNING
Project Size
+/- 100 ACRES
Completion Date
2019
27
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
21
RELEV ANT PROJECTS
FOUNTAIN INN COMMERCE PARK
AND FARMERS MARKET PA VILION
SW+ was selected by the City of Fountain Inn to provide master
planning services and streetscape design for Depot Street. In
order to provide a continuous connection to the rest of downtown
Fountain Inn, Depot Street will be realigned and narrowed to a one-
way street with on-street parking and sidewalks. The streetscape
project is part of the redevelopment efforts for the City’s downtown,
and is part of the new Farmers Market Pavilion and Commerce
Park Center.
Location
FOUNTAIN INN, SC
Project Type
FARMERS MARKET
Project Size
0.8 ACRES
Project Detail
PART OF DEPOT ST STREETSCAPE
28
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
22
RELEV ANT PROJECTS
CITY OF EASLEY DOWNTOWN MASTER PLAN
SeamonWhiteside (SW+) led an urban design and master planning
study of downtown Easley. The intention of the study was to develop
a plan to provide opportunities for downtown redevelopment to
expand north of the railroad. Key design features include a new
city green and park linked to the Doodle Trail greenway along with
a mix of uses including hospitality and residential to help sustain
and foster the revitalization efforts.
Location
EASLEY, SC
Project Type
MUNICIPAL | URBAN PLANNING
Project Size
+/- 50 ACRE STUDY AREA
Completion Date
2020
29
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
23
RELEV ANT PROJECTS
WESTMINSTER DOWNTOWN STREETSCAPE IMPROVEMENTS
SW+ provided urban planning, landscape architecture, and civil
engineering services for the first phase of implementation of
the City of Westminster’s recently adopted Downtown Master
Plan. This project focuses on streetscape and other public realm
enhancements that includes traffic improvements (redesigned
street network and parking), pedestrian accommodations,
landscaping, other streetscape elements, as well as other public
amenities (festival street, park, pavilion, plaza, and fountain).
As the Prime firm, SeamonWhiteside provided extensive
subconsultant coordination including survey, utility coordination,
cultural resources survey, cost estimation, and grant assistance.
Location
WESTMINSTER, SC
Project Type
URBAN PLANNING
Project Size
+/-10 ACRES
Completion Date
2023 (PHASE 1)
30
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
24
RELEV ANT PROJECTS
RELEV ANT PROJECTS
COUNTY SQUARE PARKING DECK &
ADMINISTRATION BUILDING
In response to the growing need for updated and expanded facilities
for Greenville County’s governmental operations, SW+ is serving
as part of the team charged with redesigning an underutilized yet
highly visible downtown corner near the Reedy River and Falls Park.
Phase 1 of this multi-phase project encompasses an area equal to
10 city blocks and consists of a new county administrative facility
with adjacent 8-level parking structure. Future phases will consist
of a mix of office/residential/retail uses with trail connectivity to
integrate into the surrounding neighborhoods. SW+ is providing
comprehensive civil engineering, landscape architecture, permit
coordination services, and construction administration for the
project.
Location
GREENVILLE, SC
Project Type
MIXED USE | REDEVELOPMENT
Project Size
35 ACRES
Completion Date
2023 (PHASE 1)
31
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
25
RELEV ANT PROJECTS
MAIN & STONE
Main + Stone is a mixed-use residential and redevelopment in
downtown Greenville, SC. Phase I of the two phase project is under
construction and work on Phase II has begun. In addition to 292
units of apartment homes, this development will include 26,000 SF
of covered parking for 307 spaces, 14,450 SF retail and commercial
space and 4,800 SF of restaurant space creating an urban
epicenter on this ideally located site. SW+ provided comprehensive
civil engineering, landscape architecture, permit coordination
services and construction administration for the project.
Location
GREENVILLE, SC
Project Type
MIXED USE | RESIDENTIAL
Project Size
4.8 ACRES | 292 UNITS
Completion Date
2016
32
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
26
RELEV ANT PROJECTS
CANV AS GREENVILLE
SW+ provided civil engineering, landscape architecture, design
development, construction documents, permit coordination, and
construction phase services for this mixed-use development.
Located in the heart of Heritage Green, Greenville’s arts and
cultural district, the development consists of Canvas Tower, a
130,000 SF office renovation of the 301 College St. building,
along with Canvas Lofts, a 48-unit, mixed-use building with retail
and residential offerings.
The developer commissioned Australian artist Guido Van
Helten to create an 18,900 square-foot mural featuring retired
teacher, Pearlie Harris, who helped integrate Greenville County’s
schools fifty years ago. The mural also features students from
A.J. Whittenberg Elementary School of Engineering. The theme
of the mural is racial diversity and education to honor the 50th
anniversary of Greenville schools’ desegregation.
Location
GREENVILLE, SC
Project Type
MIXED USE | RESIDENTIAL
Project Size
130,000 SF | 48 UNITS
Completion Date
ONGOING
33
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
27
RELEV ANT PROJECTS
SeamonWhiteside, McMillan Pazdan Smith, and the Randolph Development Group
have been working together with the City of Traveler’s Rest to create a planned, mixed-
use development on 45 acres just east of Main Street. The project aims to create a
more defined downtown space in Traveler’s Rest with a mixture of single-family, multi-
family, and commercial space. The housing component should add close to 350 units
to downtown Traveler’s Rest. Pinestone will have direct access to the popular Swamp
Rabbit Trail.
MPS is currently working on two major components for the project. The first is a series
of three new construction buildings to create a small retail center. Construction drawings
are currently complete for one of the three buildings and conceptual designs have been
completed for the other two, as of late 2023. The second project is the adaptive re-use
of two, 24,000 SF existing pre-engineered buildings on the property to create a food hall
and retail space. Construction drawings for this component have also been completed.
The project is currently on hold with construction anticipated to begin in 2024.
PINESTONE / MIXED USE
CLIENT
PineStone Capital, LLC /
The Randolph Group
LOCATION
Traveler’s Rest, SC
PROJECT TIMELINE
Building A - Permit Set Complete (Project
Currently on Hold)
June 2021 to June 2022
Building B + C - Conceptual Design
Complete, Permit Set Ongoing
July 2023 to Present
Warehouse - Permit Set Complete (Project
Currently on Hold) -
July 2021 to September 2023
34
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
28
RELEV ANT PROJECTS
35
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
29
RELEV ANT PROJECTS
At a time when Greenville County was known as the “Textile Capital of the World,”
Judson Mill was the largest mill in the county. Decades later, the mill shuttered its
operations, and was subsequently acquired by Belmont Sayre as an urban mixed-use
redevelopment project. In 2017, the partnership of Three Corners Development and
Judson Mill Ventures commissioned McMillan Pazdan Smith to transform the 800,000
SF historic structure into a wide variety of spaces: 204 affordable apartments, 215,000
SF office space, 106,000 SF light industrial space, 35,000 SF flex space, and 12 acres of
retail parcels. Residential amenities will include an outdoor kitchen, a fitness and yoga
center, a game room, a pool and hot tub, a bocce court and a bike shop.
The team started with the mill’s listing on the National Register of Historic Places.
This vital first step secured the federal tax credits associated with historic property
restorations necessary to meet the developer’s financial goals. Additionally, the design
team is working closely with the State Historic Preservation Officer (SHPO) to meet
specific design requirements. Careful attention is being given to elevations of additions
and how these affect the existing structure’s massing. Specific areas have also been
identified to remain as they were during the textile era, including matching existing
windows, while other areas are being modernized to meet daylighting and air quality
requirements. Furthermore, many of the additions that accumulated over the life of
the facility are being retained to explain how the mill evolved with the technological
advancement of the textile industry. Four large courtyards, cut precisely where approved
by SHPO, will provide the daylighting needed by interior residential units.
The $70M first two phase of the project was completed by Fall
2022, with additional upfits and renovations ongoing through
2023. The final phase is set to begin in 2024.
JUDSON MILL / MIXED USE
CLIENT
Judson Mill Ventures, LLC
LOCATION
Greenville, SC
PROJECT TIMELINE
Master Planning and National Reg. Work
2015-2016
Phase 1 - Judson Mill Lofts
Initial Studies – 2016-2017
Design Drawings – 2017-2018
Construction – 2019-2021
Phase 2 – The Warehouse
Initial Studies – 2018
Design Drawings – 2018-2022
Construction – 2020-2022
Phase 3 – The Annex
Initial Studies – 2020
Design Drawings – 2020-2022
Construction – 2022-2023
Phase 4 – Westervelt and Jenny
Initial Studies – 2022
Design Drawings – 2023
Construction – 2024-2025 (estimated)
36
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
30
RELEV ANT PROJECTS
JUDSON MILL LOFTS, AMENITY SPACE
JUDSON MILL LOFTS, POOL + OUTDOOR GRILLINGSTUMPY’S HATCHET HOUSE
BLOCHAVEN CLIMBING GYM MAGNETIC SOUTH BREWERY
THE FOUNDRY, MUSIC VENUE
37
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
31
RELEV ANT PROJECTS
Hughes Investments sought to create an exciting new mixed-use development centered
around a town square concept off I-385. McMillan Pazdan Smith (MPS) provided design
serves for the Block A Building, a 200,000 SF, six-story mixed-use structure with retail
and restaurants on the first floor and five floors of apartments above. Additionally, MPS
provided schematic design services for BridgeWay’s town square and public spaces.
Influenced by Old World architecture, BridgeWay Station is unlike any other development
in the Upstate. A central event hall pays homage to Greenville’s Southern railway station
built in 1905 and a tower in the middle of BridgeWay was modeled after Greenville’s
old city hall. The overall development features over 450,000 SF of mixed-used space,
including a mixture of restaurants, offices, entertainment venues, and apartments spread
over the 40 acre site and connected by outdoor green space and plazas. BridgeWay has
access to the Swamp Rabbit Trail via a new pedestrian and bike bridge over I-385. The
first phase of construction was completed in late 2023.
This project’s town center approach is highly relevant to your proposed project. Both
involve the creation of a central, pedestrian-friendly common space with associated
surrounding mixed-use spaces for retail, dining, entertainment, and office space.
BRIDGEWAY STATION / MIXED USE
CLIENT
Hughes Investments, Inc.
LOCATION
Mauldin, SC
PROJECT TIMELINE
Block A
(200,000 SF / Six-Story, Mixed-Use)
Design
February 2020 - May 2021
Construction (Shell)
June 2021 - February 2023
38
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
32
RELEV ANT PROJECTS
39
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
33
QUALIFICA TIONS &
EXPERIENCE
TEAM QUALIFICA TIONS & EXPERIENCE
Our talented team of professionals will be led by Chip Buchanan, Senior Civil Engineering T eam Leader, in our SW+
Greenville office with supporting services from subconsultant McMillan Pazdan Smith Architecture.
MIXED-USE
ARCHITECTURAL
CONSUL T ANT
Lisa Lanni, AIA
Anthony Tiberia, AIA
QA / QC
Chris W atson, PLA
POINT OF CONT ACT
Chip Buchanan, PE
MASTER PLANNING
Nick Myers, PLA, ISA
LANDSCAPE ARCHITECTURE
Caroline Donaldson, PLA
40
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
34
CHIP BUCHANAN, PE
Senior Civil Engineering Team Leader
Chip joined the Greenville office of SeamonWhiteside in 2022. As
a Senior Civil Engineering Team Leader. Chip is responsible for
all aspects of the civil engineering planning, design, construction
document development, permit coordination, and complete
project management services for a variety of project types. Chip
brings over 10 years of experience in the Upstate of SC.
Typical project types include municipal improvements, commercial
properties, industrial facilities, institutional, single and multi-family
residential, and mixed-use developments.
EDUCATION
Bachelor of Science, Civil Engineering
CLEMSON UNIVERSITY | CLEMSON, SC
REGISTRATIONS AND AFFILIATIONS
Professional Engineer
SOUTH CAROLINA | #35009
ULI Upstate Executive Committee
City of Greer Unified Development Ordinance
Stakeholder Committee
SIGNATURE PROJECTS
Woven Mixed-Use Development
GREENVILLE, SOUTH CAROLINA
Markley Square Mixed-Use Development
GREENVILLE, SOUTH CAROLINA
Judson Mill
GREENVILLE, SOUTH CAROLINA
Pelham Exchange
Commercial Master Plan
GREENVILLE, SOUTH CAROLINA
Mauldin Fire Station
MAULDIN, SOUTH CAROLINA
Hwy 29 & Orr Streetscape
ANDERSON, SOUTH CAROLINA
City of Greenville Public Safety Campus
GREENVILLE, SOUTH CAROLINA
Furman University
North Campus Pedestrian Plan
GREENVILLE, SOUTH CAROLINA
Clemson University
Madren Center Master Plan
CLEMSON, SOUTH CAROLINA
Anderson University
Sports Complex Master Plan
ANDERSON, SOUTH CAROLINA
QUALIFICA TIONS &
EXPERIENCE
41
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
35
CHRIS WATSON, PLA
Director
Chris joined SeamonWhiteside in 1994, beginning work in the
Mount Pleasant main office and then moving to Greenville in 2002
to establish the new branch office. Chris has practiced landscape
architecture for more than 27 years, providing master planning,
landscape architectural design, and project management services
to public and private sector clients.
His typical projects include higher education campuses, parks,
recreation and resort development, mixed-use developments,
residential land planning, commercial and retail, professional
office buildings, streetscape master plans and improvements,
municipal gateways, neighborhood amenity areas, and golf course
site improvements.
EDUCATION
Bachelor of Landscape Architecture
CLEMSON UNIVERSITY | CLEMSON, SC
REGISTRATIONS AND AFFILIATIONS
Professional Landscape Architect
SOUTH CAROLINA | #0733
NORTH CAROLINA | #1787
TENNESSEE | #116
ALABAMA | #891
American Society of Landscape Architects
Clemson University Professional Advisory Board
Urban Land Institute
Art in Public Spaces Greenville Commission
SIGNATURE PROJECTS
City Park Master Plan
GREENVILLE, SOUTH CAROLINA
Rocky River Nature Park Master Plan
ANDERSON, SOUTH CAROLINA
VaDuMar Park
SPARTANBURG, SOUTH CAROLINA
Pickens Recreation Complex
PICKENS, SOUTH CAROLINA
Cherokee County YMCA
GAFFNEY, SOUTH CAROLINA
Swamp Rabbit Trail
GREENVILLE, SOUTH CAROLINA
Eastside Recreation Complex
ANDERSON, SOUTH CAROLINA
Clemson University
Kingsmore Stadium Addition
CLEMSON, SOUTH CAROLINA
Pickens City Park Amphitheater
PICKENS, SOUTH CAROLINA
Henry L Jolly Park
GAFFNEY, SOUTH CAROLINA
City of Clemson
Recreation Master Plan
CLINTON, SOUTH CAROLINA
QUALIFICA TIONS &
EXPERIENCE
42
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
36
NICK MYERS, PLA, ISA
Team Leader
After more than seven years of working with AECOM in St.
Petersburg, Florida, Nick joined the SeamonWhiteside Greenville
office in 2020 as a Senior Landscape Architect and is now a
Landscape Architecture Team Leader.
As a Professional Landscape Architect and ISA Certified Arborist
Nick has experience in projects ranging from small-scale, residential
site designs to multimodal transportation enhancements for local
municipalities to roadway landscape projects for major interstate
highways and interchanges for FDOT. He has worked in various
phases of project development, from site design and initial client
interview, through design development and construction. Nick has
contributed to the planning, design, and production of landscape
improvements for multiple FDOT highways, interchanges, and
capacity improvement projects. Additional experience includes
performing post design services, tree assessments, public
involvement, and the planning of trails and sidewalks, graphic
design, and presentations.
SIGNATURE PROJECTS
Anderson University
West Edge Master Plan
ANDERSON, SOUTH CAROLINA
Anderson University
Pedestrian Connections Master Plan
ANDERSON, SOUTH CAROLINA
Furman University
North Village Pedestrian Plan
GREENVILLE, SOUTH CAROLINA
Furman University
White Oaks Landscape Assessment & Master
Plan
GREENVILLE, SOUTH CAROLINA
Furman University
Land Use Planning - Local Consultant
GREENVILLE, SOUTH CAROLINA
Central Carolina Technical College
Century Drive Gateway & Streetscape
Improvements
SUMTER, SOUTH CAROLINA
Mauldin City Center Master Plan
MAULDIN, SOUTH CAROLINA
Westminster Downtown Master Plan
WESTMINSTER, SOUTH CAROLINA
Hall Street Park Master Plan
WESTMINSTER, SOUTH CAROLINA
County Square Parking Deck and
Administration Building
GREENVILLE, SOUTH CAROLINA
EDUCATION
Bachelor of Landscape Architecture
CLEMSON UNIVERSITY | CLEMSON, SC
REGISTRATIONS AND AFFILIATIONS
Professional Landscape Architect
SOUTH CAROLINA | IN PROGRESS
FLORIDA | #LA6667226
Certified Arborist
International Society of Arboriculture
#FL-9305A
QUALIFICA TIONS &
EXPERIENCE
43
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
37
CAROLINE DONALDSON, PLA
Landscape Architecture Project Manager
Caroline Donaldson joined SeamonWhiteside in 2017 after working
with the Graham Kimak Landscape Designs for over three years.
Typical projects types for Caroline include mixed-use residential,
single-family residential, office buildings, shopping centers,
and park and recreation planning, and entrance design. Her
responsibilities begin with initial conceptual design and continue
through construction document preparation, permitting, and close-
out.
EDUCATION
Bachelor of Fine Art
SAMFORD UNIVERSITY | BIRMINGHAM, AL
Bachelor of Art in English
SAMFORD UNIVERSITY | BIRMINGHAM, AL
Master of Landscape Architecture
CLEMSON UNIVERSITY | CLEMSON, SC
REGISTRATIONS AND AFFILIATIONS
Professional Landscape Architect
SOUTH CAROLINA | #1568
TENNESSEE | #1301
SIGNATURE PROJECTS
Pinestone Mixed Use
TRAVELERS REST, SOUTH CAROLINA
Duckworth Tucker Sports Park
ANDERSON, SOUTH CAROLINA
The Settlement
SIMPSONVILLE, SOUTH CAROLINA
Clemson Tennis Center
CLEMSON, SOUTH CAROLINA
Adams Hill Apartments
GREENVILLE, SOUTH CAROLINA
Legacy Square at Verdae
GREENVILLE, SOUTH CAROLINA
Westside Single-Family
SPARTANBURG, SOUTH CAROLINA
O’Neil Village
GREER, SOUTH CAROLINA
Federal Courthouse
GREENVILLE, SOUTH CAROLINA
County Square Redevelopment
GREENVILLE, SOUTH CAROLINA
Southern First Headquarters
GREENVILLE, SOUTH CAROLINA
QUALIFICA TIONS &
EXPERIENCE
44
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
38
Taft Family Ventures / Belmont Sayre
Judson Mill
Multi-Family, Mixed-Use, Adaptive Reuse
Principal in Charge
Suncap Property Group
Markley + Main
Mutli Family Mixed Use
Principal in Charge
NHE, Inc.
The Alliance
Mutli Family Mixed Use
Principal in Charge
The Beach Company
McBee Station
Multi Family Mixed Use
Project Manager
Stone + Main
Multi Family Mixed-Use
Master Plan, New Facility
Project Manager
River Rock
Multi Family Mixed Use
Master Plan, New Facility
Principal in Charge
Toll Brothers
301 College Street Townhomes
Multi-Family, Mixed-Use Development
Greenville, SC
Principal in Charge
Blue Wall Real Estate
Aug Smith on Main Building
Multi Family Mixed Use
Adaptive Reuse
Principal in Charge
Mulberry St. Apartments
Multi Family Mixed Use
Principal in Charge
Dewberry Capital
Oyster Park
New Mixed Use Facility
Principal in Charge
City of Greenville Housing Authority
The Preserve at Logan Park
Proposed Mixed Income Housing
Master Plan
Project Manager
Senior Housing
New Facility
Project Manager
Garden Apartments
Renovation
Project Manager
Asheville Housing Authority
Lee Walker Heights
New Multi-Family Housing
Master Plan
Principal in Charge
City of Augusta
Laney Walker / Bethlehem District
Master Planning and Design
Project Manager
City of Greenville
Design Guidelines for Central
Business District
Principal in Charge
Homes Urban, LLC
100 East
New Mixed-Use Development
Project Manager
400 Meeting Street Apartments
Student Housing
Project Manager
Grandmarc at Clemson
Student Housing Mixed Use
Project Manager
100 Prince Ave
Multi Family Mixed Use
Principal in Charge
Bishop Building
Multi Family Mixed Use
Renovation and Addition
Principal in Charge
EDUCATION
Master of Architecture
Clemson University, 1993
B.S. in Architecture
Clemson University, 1989
Associate in Applied Science,
Architectural Technology
State University of New York Agricultural
and Technical College, 1984
REGISTRATIONS
SC, MI, NJ, DC
PROFESSIONAL AFFILIATIONS
American Institute of Architects,
Member
CREW, Member
Urban Land Institute (ULI), Member,
Regional Council Rethinking Southern
City, 2018 - Present
Greenville County Historical Society,
Member
Greenville Humane Society Board
Vice President, 2014-2019
AIA Women in Architecture, Chair &
Founder, 2010-2012
Fine Arts Center
Advisory Board, 2013-2015
Trustee, CAF, 2015
PRINCIPAL IN CHARGE / GREENVILLE STUDIO DIRECTOR
LISA M. LANNI , AIA
Lisa is a principal and director of MPS’s Greenville studio. With over 30 years of experience
in mixed-use, adaptive reuse, and restoration brings a creative approach to urban design.
Her design approach is based on promoting connectivity and social interaction, respecting
our historic and cultural resources and valuing sustainable design. By researching the
history of each place and providing an analysis of the site, Lisa is able to create a design
that embodies each client’s personality and enhances the quality of the community.
PROJECT EXPERIENCE
QUALIFICA TIONS &
EXPERIENCE
45
OCONEE COUNTY RFQ #20-02
ENGINEERING | CONSUL T ANT SERVICES ON-CALL
MAULDIN CITY CENTER VILLAGE MASTER PLAN
CITY OF MAULDIN
39
Judson Mill
Building 1 Multi-Family
Adaptive Reuse
Project Manager
Building 2 Mixed Use
Adaptive Reuse
Project Manager / Project Architect
Building 4 & Pumphouse
Adaptive Reuse
Project Manager / Project Architect
The Beach Company
Main + Stone
Multi-Family Mixed-Use
Master Plan, New Facility
Project Manager
On The Trail
Multi-Family, Mixed Use, Master Planning
Brownfield Redevelopment
Project Manager
Homes Urban, LLC
100 East
New Mixed-Use Development
Project Architect
400 Meeting Street Apartments
Student Housing
Team Architect
CTRE
201 East North Street
Mixed Use Development
Project Architect
Blue Moon Partners
114 East Stone Avenue
Mixed Use Development
Project Architect
East Central Lofts
New Mixed Use Project
Project Architect
Find Great People
Interior Upfit
Project Architect
133 South Main Street
New Mixed Use Building
Project Architect
22 South Main Street
Renovated Mixed Use Building
Project Architect
Elliott Davis
Greenville Office Upfit
Project Architect
Charlotte Office Upfit
Project Architect
Nashville Office Upfit
Project Architect
Charleston Office Upfit
Project Architect
Immedion
Data Center & Office Upfit
Project Architect
Lincoln Energy Solutions
Office Upfit
Project Architect
World Acceptance Corporation
Headquarters
Addition/Renovation
Team Architect
Markets Retail Centers
Markets at Epps Bridge
New Shopping Center
Project Architect
Markets at Sugarloaf
New Shopping Center
Project Architect
Markets at Cedar Ridge
New Shopping Center
Team Architect
Markets at Anderson
New Shopping Center
Team Architect
EDUCATION
Master of Architecture
Tulane University 2002
Bachelor of Architecture
Tulane University, 1996
REGISTRATIONS
SC, NY
PROFESSIONAL AFFILIATIONS
American Institute of Architects,
Member
National Council of Architectural
Registration Boards, member
Anthony is a Principal and Director of the Greenville Community Practice Area
with more than 25 years of architectural experience over a broad range of project
types including mixed-use, urban planning, adaptive re-use, historic preservation,
commercial office, multi-family and athletic facilities. His design approach is focused
on understanding the context and history of a project site to develop a solution that
embraces client goals, while enhancing the overall community.
PROJECT EXPERIENCE
PROJECT MANAGER / GREENVILLE COMMUNITY PRACTICE DIRECTOR
ANTHONY TIBERIA , AIA
QUALIFICA TIONS &
EXPERIENCE
46
Judson Mills Bldg 6000, Ste 6060, 701 Easley Bridge Rd, Greenville, SC 29611
(864) 298-0534 | SeamonWhiteside.com
Mount Pleasant | Greenville | Summerville | Spartanburg | Charlotte | Raleigh
Elevating the site design experience.
February 13, 2024
City of Mauldin [via email]
5 E. Butler Road
Mauldin, SC 29662
Attn: Mr. J.R. Charles
MAULDIN CITY CENTER VILLAGE MASTER PLAN
City of Mauldin, SC
SW+ Project # GR11075
Per your request, Seamon, Whiteside & Associates, Inc. (SW+) is pleased to present the following proposal that provides the
anticipated scope of services and associated fees for the referenced project. This proposal is based on the RFP issued on
November 13, 2023 and the in-person meeting with City Staff on February 1, 2023 to further define the scope. This proposal
will replace the fees provided in RFP submission by SW+ on December 13, 2023. SW+ will provide civil engineering and
landscape architecture design services described below.
Scope of Services
Division 1: Kickoff, Due Diligence, & Schematic Design
1. Kickoff meeting with City of Mauldin Stakeholders (Client) to review the project requirements, adjacent development
projects, Jenkins Ct streetscape project and desired development program.
2. Use existing site data (county GIS, surveys/plats, maps, previous studies, drone imagery, etc.) to create base map to
develop master plan concepts. Research zoning and land development restrictions of property including restrictive
covenants (if applicable) along with utility availability.
3. Visit the site to identify opportunities and constraints that have the potential to influence the design.
4. Review all available Environmental Studies available for the project area.
5. Initial coordination with the following agencies on project requirements:
a. City/County (Planning, Land Disturbance and Storm Water)
b. Local water authority (water)
c. Local sewer authority (sewer)
d. SCDOT (site access)
6. Compile Letters of Coordination and availability from agencies and utility providers (if necessary).
7. Prepare a Schematic Design “Bubble Diagram” Area Plan for the mixed-use urban redevelopment based on the Client’s
program, site conditions, public agency input, and applicable regulations. This plan will show a schematic parcel layout
based on access locations, grading/drainage constraints and other utility requirements.
8. Review the Plan with the Client and revise based on Client’s input.
9. Schedule and attend a Plan Review Meeting with City of Mauldin to review the Schematic Design Area Plan.
47
City of Mauldin
Page 2 of 12
February 13, 2024
S:\GENERAL OFFICE\JOB DEV - PROPOSALS\2024 FY\CITY OF MAULDIN\2024-02-13 GR11075 SW+ FEE PROPOSAL (REVISED).DOCX PAGE 2 OF 5 =
Division 2: Market Review
1. Coordinate with adjacent developments, outside development partners and our Architectural partner (McMillan Pazdan
Smith) determine the “highest & best” uses for the available parcels in the project area.
2. Provide a summary document of these uses including precedent imagery and building massing.
3. Meet with Client to review the findings.
Division 3: Site Evaluation
1. Evaluate the potential sites for the “highest & best” uses based on the known site constraints.
2. Provide a summary document of the potential uses by parcel including pros and cons of each.
Division 4: Master Planning
1. Meet with Client to review the findings of Divisions 1-3 to finalize the desired development program.
2. Prepare two (2) CAD-produced sketch concept layouts for the project site that explores desired potential development
scenarios & densities for the “highest & best” uses for the overall urban redevelopment. These concepts will incorporate
phasing scenarios.
3. Receive comments from client on their preferred development scenario.
4. Prepare a final, rendered conceptual site study (deliverable) for the City to use for marketing purposes.
Notes:
1. It is assumed that the entire project will be designed and permitted in one phase.
2. 3D perspectives, animation and detailed illustrative renderings are not included in this proposal but can be provided for a
negotiated fee.
3. Geotechnical studies, environment audits, structural design of retaining walls greater than 3’ in height, design of site lighting,
traffic studies, and other supporting services not defined in the scope of this proposal, should they be required, will be
provided by the Client through separate contract with outside consultant(s).
4. Client shall be responsible for the payment of application and permit fees, impact and tap fees, inspection fees, maintenance
fees, bonds, and other agency charges associated with the permitting and construction of the Project.
5. It is our understanding that the current property zoning supports the intended use. This proposal does not include any
efforts required for rezoning of the property or efforts for variances or special use exceptions for the project. Should our
assistance in these efforts be requested it will be provided as additional services on an hourly rate basis.
6. Coverage under the SC NPDES General Permit for Construction Activities (NPDES) is required prior to initiation of land
disturbing activities. A prerequisite to coverage is the submittal to, and approval of, a SWPPP by the local agency having
jurisdiction under the SCDHEC MS4 program. In addition to initial erosion and sediment control measures, the SWPPP
also includes various other provisions outside of the scope of the construction drawings. The SWPPP is intended to be a
framework outlining measures that are intended to be implemented and maintained throughout the construction period. As
a result, additional efforts related to the implementation, maintenance, and updating of the SWPPP are required during
construction. Some of these must be performed by SW+ and others can be performed by SW+ or other parties.
7. Opinions of probable costs that are prepared by SW+ shall be based on its experience and qualifications and represent its
judgment as a Consultant familiar with the construction industry but shall not be a guarantee that construction costs will not
vary from its opinions of probable cost.
48
City of Mauldin
Page 3 of 12
February 13, 2024
S:\GENERAL OFFICE\JOB DEV - PROPOSALS\2024 FY\CITY OF MAULDIN\2024-02-13 GR11075 SW+ FEE PROPOSAL (REVISED).DOCX PAGE 3 OF 5 =
8. SW+ recognizes that design refinement and problem solving are iterative processes. However, it must also be recognized
that excessive and continuous design changes are impossible to accurately quantify and are, therefore, outside of the scope
of this proposal. We understand that a design will evolve during the submittal and review processes and we do intend for
these types of adjustments to be included. However, extensive and continuous design changes that are beyond the scope
of those typical for a project of similar size and complexity will be charged as additional services on an hourly rate basis.
9. Early in the design process, the Client shall coordinate with SW+ to establish a site work and landscaping construction
budget. Once the budget is established, project design will proceed in accordance with the scope and quality criteria defined
as the basis for preparing the budget. After final design and preparation of CD’s is underway, any Client requested changes
that are inconsistent with the originally established scope and quality criteria will be charged as additional services on an
hourly rate basis.
10. During construction, construction drawing revisions due to changes in field conditions that are beyond SW+’s control will
be provided on an hourly rate or negotiated fee basis.
Fees:
Division 1: Kickoff, Due Diligence, & Schematic Design ........................................................................................ $7,000
Division 2: Market Review ...................................................................................................................................... $3,500
Division 3: Site Evaluation ...................................................................................................................................... $6,000
Division 4: Master Planning .................................................................................................................................. $13,500
Hourly rate services and/or additional services shall be invoiced according to the table below:
SW+ current hourly rates are as follows (see note below):
Principal in Charge $275.00
Managing Principal $250.00
Professional Support $100.00
Administrative Support $80.00
Landscape Architecture
Director $210.00
Senior Landscape Architecture Team Leader/Practice Leader 2 $200.00
Landscape Architecture Team Leader/Practice Leader 1 $190.00
Senior Landscape Architecture Project Manager 3/Senior Land Planner 3 $190.00
Senior Landscape Architecture Project Manager 2/Senior Land Planner 2 $180.00
Senior Landscape Architecture Project Manager 1/Senior Land Planner 1 $175.00
Landscape Architecture Project Manager/Land Planner 5 $170.00
Landscape Architecture Project Coordinator/Land Planner 4 $165.00
Land Planner 3 $160.00
Land Planner 2 $150.00
Land Planner 1 $140.00
Civil Engineering
Director $210.00
Senior Civil Engineering Team Leader/Practice Leader 2 $200.00
Civil Engineering Team Leader/Practice Leader 1 $190.00
Senior Civil Engineering Project Manager 3/Senior Designer 3 $190.00
Senior Civil Engineering Project Manager 2/Senior Designer 2 $180.00
Senior Civil Engineering Project Manager 1/Senior Designer 1 $175.00
Civil Engineering Project Manager/Civil Designer 5 $170.00
49
City of Mauldin
Page 4 of 12
February 13, 2024
S:\GENERAL OFFICE\JOB DEV - PROPOSALS\2024 FY\CITY OF MAULDIN\2024-02-13 GR11075 SW+ FEE PROPOSAL (REVISED).DOCX PAGE 4 OF 5 =
Civil Engineering Project Coordinator/Civil Designer 4 $165.00
Civil Designer 3 $160.00
Civil Designer 2 $155.00
Civil Designer 1 $145.00
Senior CAD Technician $150.00
CAD Technician 4 $140.00
CAD Technician 3 $130.00
CAD Technician 2 $120.00
CAD Technician 1 $110.00
Construction Administration
Director $210.00
Construction Administration Team Leader $190.00
Senior Construction Administration Project Manager $175.00
Construction Administration Project Manager $170.00
Construction Administration Project Coordinator $165.00
Construction Administration Field Representative 2 $150.00
Construction Administration Field Representative 1 $140.00
Entitlements Manager $140.00
Permitting Coordinator $130.00
Surveying
Director $200.00
Surveying Team Leader $190.00
Surveying Crew Chief $120.00
3 Man Survey Crew $240.00
2 Man Survey Crew $180.00
CAD Technician 4 $140.00
CAD Technician 3 $130.00
CAD Technician 2 $120.00
CAD Technician 1 $110.00
Note: Hourly rates are subject to change October 1 of each year. Hourly rates to be invoiced shall be those in effect at
the time services are provided.
Office reimbursable expenses will be billed at the rates listed in the table below plus a 10% handling fee:
Mileage outside of the local area ............................................................................................. $0.67 per mile
(Local area is defined as the metropolitan area of the originating office of the proposal)
Printing of construction and project drawings ($0.40 per sq ft)
24 x 36 .............................................................................................................................. $2.40 each
30 x 42 .............................................................................................................................. $3.50 each
36 x 48 .............................................................................................................................. $4.80 each
Color inkjet plotting ($8.00 per sq ft)
24 x 36 ............................................................................................................................ $48.00 each
30 x 42 ............................................................................................................................ $70.00 each
36 x 48 ............................................................................................................................ $96.00 each
Black and white inkjet plotting ($2.00 per sq ft)
24 x 36 ............................................................................................................................ $12.00 each
30 x 42 ............................................................................................................................ $17.50 each
36 x 48 ............................................................................................................................ $24.00 each
50
City of Mauldin
Page 5 of 12
February 13, 2024
S:\GENERAL OFFICE\JOB DEV - PROPOSALS\2024 FY\CITY OF MAULDIN\2024-02-13 GR11075 SW+ FEE PROPOSAL (REVISED).DOCX PAGE 5 OF 5 =
Black and white Xerox copies
8½ x 11 ............................................................................................................................. $0.20 each
8½ x 14 ............................................................................................................................. $0.25 each
11 x 17 .............................................................................................................................. $0.35 each
Color Xerox copies
8½ x 11 ............................................................................................................................. $1.00 each
8½ x 14 ............................................................................................................................. $2.75 each
11 x 17 .............................................................................................................................. $3.50 each
When an estimated fee range is indicated, this estimate was made based on current understanding of project scope and/or
construction duration. If it becomes apparent that this estimate will be exceeded, we will notify Client in advance of reaching
the upper limit of the indicated range.
Other project related reimbursable expenses, such as but not restricted to postage, long distance telephone calls, travel
expenses, courier fees, and agency permitting fees will be billed at actual cost plus a 10% handling fee. Fees for outside
subconsultants will be billed at actual cost plus a 15% handling fee. Fees and reimbursable expenses will be invoiced every 4
weeks.
Should you find this Contract and attached General Terms of Agreement acceptable, please confirm by signing in the space
provided below and return one executed original to our office. We look forward to working with you on this project.
Should you have any questions or need additional information, please call our office.
SEAMON, WHITESIDE & ASSOCIATES, INC.
Joe Bryant, PE, LEED
® AP
Executive VP/Managing Principal | Greenville/Spartanburg
JB/cb/nm/cw
Accepted By:
____________________________________________________________________________________________________
Signature and Title Date
51
SEAMON, WHITESIDE & ASSOCIATES, INC. (SW+/CONSULTANT)
GENERAL TERMS OF AGREEMENT
=
1. The Agreement. This document/agreement will serve as a contract for the proposed professional services. This
Agreement is to be governed by the law of the State of South Carolina. This Agreement contains the entire and fully
integrated agreement between the parties and supersedes all prior and contemporaneous negotiations, representations,
agreements or understandings, whether written or oral. This Agreement can be supplemented or amended only by a written
document executed by both parties. Provided, however, that any conflicting or additional terms on any purchase order
issued by the Client shall be void and are hereby expressly rejected by the Consultant. Any provision in this Agreement
that is unenforceable shall be ineffective to the extent of such unenforceability without invalidating the remaining provisions.
The non-enforcement of any provision by either party shall not constitute a waiver of that provision nor shall it affect the
enforceability of that provision or of the remainder of this Agreement.
2. Consultant’s Scope of Services and Additional Services. The Consultant’s undertaking to perform professional services
extends only the services specifically described in this Agreement. However, if requested by the Client and agreed by the
Consultant, the Consultant will perform Additional Services, which shall be governed by these provisions. Unless otherwise
agreed to in writing, the Client shall pay the Consultant for any Additional Services an amount based upon the Consultant’s
then-current hourly rates plus an amount to cover certain direct expenses including in-house duplicating, local mileage,
telephone calls, postage, and word processing.
3. Period of Services. Unless otherwise stated herein, the Consultant will begin work timely after receipt of a properly
executed copy of this Agreement and any required retainer amount. This Agreement is made in anticipation of conditions
permitting continuous and orderly progress through completion of services. Times for performance shall be extended as
necessary for delays or suspensions due to circumstances that the Consultant does not control. If such delay or suspension
extends for more than six months (cumulatively), Consultant’s compensation shall be renegotiated. Furthermore, if the
services covered by this Agreement have not been completed within 12 months of the date hereof, through no fault of SW+,
the amounts of the compensation, rates and multiples set forth herein are subject to equitable adjustment.
4. Assignment. Neither party to this Agreement shall transfer, sublet or assign any rights or duties under or interest in this
Agreement, including but not limited to monies that are due or monies that may be due, without the prior written consent of
the other party. Subcontracting to subconsultants, normally contemplated by the Consultant as a generally accepted
business practice, shall not be considered an assignment for purposes of this Agreement.
5. Execution Authority. The individual executing this Contract, if acting on behalf of a partnership, corporation, or funding
agency, represents that he has the authority to do so.
6. Changed Conditions. The Client shall rely on the Consultant’s judgment as to the continued adequacy of this agreement
in light of occurrences or discoveries that were not originally contemplated by or known to the Consultant. Should the
Consultant call for the contract renegotiation, the Consultant shall identify the changed conditions necessitating
renegotiation and the Consultant and the Client shall promptly and in good faith enter into renegotiation of this Agreement.
If terms cannot be agreed to, the parties agree that either party has the absolute right to terminate this Agreement.
6.1. The Consultant shall put forth reasonable professional efforts to comply with codes, regulations, ordinances, and laws
in effect as of the date of the Agreement. Modifications to said ordinances, regulations, etc. that occur after the
Agreement date and that would impact the project through an expansion of services would constitute additional
services.
7. Termination. Either the Client or the Consultant may terminate this agreement at any time with or without cause upon
giving the other party five (5) calendar days prior written notice. The Client shall within seven (7) calendar days of
termination pay the Consultant for all services rendered and all costs incurred up to the date of termination, in accordance
with the compensation provisions of this contract.
8. Standard of Care. In providing services under this agreement and complying with applicable laws, ordinances, and
regulations, including the Americans with Disabilities Act, the Consultant will endeavor to perform in a manner consistent
with that degree of care and skill ordinarily exercised by members of the same profession currently practicing under similar
circumstances at the same time and in the same or similar locality.
52
8.1. The Americans with Disabilities Act (ADA) provides that it is a violation of the ADA to design and construct a facility
for first occupancy later than January 26, 1993, that does not meet for accessibility and usability requirements of the
ADA except where an entity can demonstrate that it is structurally impractical to meet such requirements. The Client
acknowledges that the requirements of the ADA will be subject to various and possibly contradictory interpretations.
The Consultant, therefore, will use his or her reasonable professional efforts to interpret applicable ADA requirements
and other federal, state and local laws, rules, codes, ordinances and regulations as they apply to the project. The
Consultant, however, cannot and does not warrant or guarantee that the Client’s project will comply with interpretations
of ADA requirements and/or requirements of other federal, state and local laws, rules, codes, ordinances and
regulations as they apply to the project.
9. Certifications. The terms “Certification,” “Certify,” and “Certified,” as used in lending or regulatory agency documents
which require the rendering of a professional opinion concerning compliance with such documents shall mean a statement
by a Licensed Professional representing that professional services have been performed by him or under his direct
supervision and, based upon the Licensed Professional’s knowledge, information and belief, are consistent with commonly
accepted local standards of practice; NO GUARANTEE OR WARRANTY IS EITHER EXPRESSED OR IMPLIED.
10. Client’s Responsibilities. In addition to other responsibilities described herein or imposed by law, the Client shall:
10.1. Designate in writing a person to act as its representative with respect to this Agreement, such person having complete
authority to transmit instructions, receive information, and make or interpret the Client’s decisions.
10.2. Provide all information and criteria as to the Client’s requirements, objectives, and expectations for the project including
all numerical criteria that are to be met and all standards of development, design, or construction.
10.3. Furnish, at the Client’s expense, all information, requirements, geotechnical reports, data, surveys and instructions
required by this Agreement. The Consultant may use such information, requirements, geotechnical reports, data,
surveys and instructions in performing its services and is entitled to rely upon the accuracy and completeness thereof.
10.4. Client agrees to not hold Consultant responsible for errors or omissions in Consultant’s work that are directly
attributable to errors or incorrect data provided to Consultant by Client or Client’s other consultants. Client further
acknowledges that any redesign or corrective efforts required by Consultant resulting from incorrect information
provided by Client or Client’s other consultants will be paid for by the Client as additional services.
10.5. Arrange for access to the site and other private or public property as required for the Consultant to provide its services.
10.6. Review all documents or oral reports presented by the Consultant and render in writing decisions pertaining thereto
within a reasonable time so as not to delay the services of the Consultant.
10.7. Give prompt written notice to the Consultant whenever the Client becomes aware of any development that affects the
scope, timing, or payment of the consultant’s services or any defect or noncompliance in any aspect of the project.
10.8. Bear all costs for the payment of fees associated with the project. Such fees would include but not be limited to permit
review and application fees, impact fees, and capacity fees. The Consultant will notify the client regarding the amount
of fees and timing of payment.
11. Method of Payment. The Client agrees to pay the Consultant’s invoices in a timely manner:
11.1. The Client agrees to pay the Consultant for work performed in accordance with the terms of this Contract, without
regard to the success of the project.
11.2. For any payment, not reasonably in dispute, that is not received within 30 days, the Client shall pay a service charge
on the past due amount, including interest at the rate of 1½% per month.
11.3. If payment is not received within 60 days, the Consultant may at their option and with five days written notice, suspend
services or terminate this Agreement on the grounds of substantial nonperformance by the Client. Should SW+’s right
of suspension or termination be exercised, they shall not be liable to the Client for delays or damages caused by the
suspension or termination.
11.4. Payments on invoices submitted by SW+ for services performed shall not be delayed, postponed or otherwise withheld
pending completion or success of construction, or receipt of funding from lending institutions, government grants, or
other sources.
11.5. No deductions shall be made from the Consultant’s compensation on account of liquidated damages or on account of
cost in changes in the Work, other than those for which the Consultant has been finally determined to be liable.
Invoices for payment shall not be offset by any claims for withholding or deductions by the Client unless the Consultant
agrees or has been finally determined liable for such amounts.
53
11.6. The Consultant shall be entitled to reimbursement by the Client for reasonable fees and expenses when collection
through an attorney or collection agency is necessary.
12. Fees Not Dischargeable. The Client agrees that any debt owed to the Consultant for professional services provided is
non-dischargeable in bankruptcy meaning that any fees owed would survive in the event that the Client should ever declare
bankruptcy.
13. Fee Resolution. The parties hereto consent that the exclusive forum for resolving any fee dispute/claim arising under this
agreement shall be the Court of Common Pleas (Non-Jury) in the county of the originating office of this proposal: Charleston
County or Greenville County, South Carolina.
14. Dispute Resolution. In an effort to resolve any conflicts that arise during the design or construction of the project or
following the completion of the project, the Consultant and Client agree that all disputes between them arising out of or
relating to this Agreement shall be submitted first to mediation in accordance with the Construction Industry Mediation
Procedures of the American Arbitration Association as a precedent to litigation.
15. Attorney Fees. In the event legal action is necessary to enforce the payment terms of this Agreement, the Consultant shall
be entitled to collect from the Client any judgment or settlement sums due, plus reasonable attorneys’ fees, court costs and
other expenses incurred by the Consultant for such collection action and, in addition, the reasonable value of the
Consultant’s prevailing fee schedule and expense policies.
16. Statutes of Limitations. Causes of action between the parties to this Agreement pertaining to acts or failures to act shall
be deemed to have accrued and the applicable statutes of limitations shall commence to run not later than either the date
of Substantial Completion for Acts or failures to act occurring prior to Substantial Completion or the date of issuance of the
final Certificate for payment for acts or failures to act occurring after Substantial Completion. In no event shall such statutes
of limitations commence to run any later than the date when the Consultant’s services are substantially completed.
17. Limitation of Liability. The Client agrees to limit the liability of the Consultant and Consultant’s officers, directors, partners,
employees, owners, and subconsultants for any and all claims, losses, costs, and damages of any nature whatsoever that
arise out of any cause of action, so that the total aggregate liability of the Consultant and Consultant’s officers, directors,
partners, employees, owners, and subconsultants shall not exceed $50,000.
18. Certificate of Merit. The Client shall make no claim for professional negligence, either directly or in a third-party claim,
against the Consultant unless the Client has first provided the Consultant with a written certification executed by an
independent Consultant currently practicing in the same discipline as the Consultant and licensed in the State of South
Carolina. This certification shall: a) contain the name and license number of the certifier; b) specify each and every act or
omission that the certifier contends is a violation of the standard of care expected of a Consultant performing professional
services under similar circumstances; and c) state in complete detail the basis for the certifier’s opinion that each such act
or omission constitutes such a violation. This certificate shall be provided to the Consultant not less than thirty (30) calendar
days prior to the presentation of any claim or the institution of any arbitration or judicial proceeding.
19. Insurance. The Client is advised to seek the advice of a qualified insurance professional with regarding any and all
insurance requirements for the project. The Client agrees to indemnify the Consultant from damages arising from
inadequate insurance coverage for the project. The Consultant carries Workers’ Compensation insurance, professional
liability insurance and general liability, and automobile insurance. If the Client directs the Consultant to obtain increased
insurance coverage, the Consultant will take out such additional insurance, if obtainable, at the Client’s expense.
20. Betterment. If, due to the Consultant’s error, any required item or component of the project is omitted from the project
construction documents prepared by Consultant or any other entity retained by Client to perform services for the Project ,
the Consultant shall not be responsible for paying the cost to add such item or component to the extent that such item or
component would have been otherwise necessary to the project or otherwise adds value or betterment to the project. In no
event will the Consultant be responsible for any cost or expense that provides betterment, upgrade or enhancement of the
project.
21. Use of Documents. SW+ and its subconsultants shall be deemed the authors and owners of their respective Instruments
of Service, including the Surveys, Drawings, Specifications, Reports, Field Data, Notes and other documents whether
handwritten or in electronic form, and shall retain all common law, statutory and other reserved rights, including copyrights
thereto.
54
21.1. The Client acknowledges the Consultant’s construction documents, including electronic files, as the work papers of
the Consultant and the Consultant’s instruments of professional service. Nevertheless, the final construction
documents prepared under this Agreement shall become the property of the Client upon completion of the services
and payment in full of all monies due to the Consultant. The Client shall not reuse or make any modification to the
construction documents without the prior written authorization of the Consultant. The Client shall not provide the
Consultant’s Surveys or other construction documents in any format to any third-party without the written consent of
Consultant. The Client agrees, to the fullest extent permitted by law, to defend, indemnify and hold harmless the
Consultant, its officers, directors, employees and subconsultants (collectively, Consultant) against any damages,
liabilities or costs, including reasonable attorneys’ fees and defense costs, arising from or allegedly arising from or
in any way connected with the unauthorized reuse or modification of the construction documents by the Client or any
person or entity that acquires or obtains the construction documents from or through the Client without the written
authorization of the Consultant.
21.2. Under no circumstances shall the transfer of ownership of the Consultant’s drawings, specification, electronic files or
other instruments of service be deemed a sale by the Consultant, and the Consultant makes no warranties, either
express or implied, of merchantability and fitness for any particular purpose, nor shall such transfer be construed or
regarded as any waiver or other relinquishment for the Consultant’s copyrights in any of the foregoing, full ownership
of which shall remain with the Consultant, absent the Consultant’s express prior written consent.
22. Electronic Documents. The Consultant may furnish to the Client and other parties as required during the execution of the
Work, documents in electronic form. The Client shall agree to the following terms with regard to distribution and use of
documents in electronic form:
22.1. In accepting and utilizing any drawings, reports and data on any form of electronic media generated and furnished by
the Consultant, the Client agrees that all such electronic files are instruments of service of the Consultant, who shall
be deemed the author, and shall retain all common law, statutory law and other rights, without limitation, including
copyrights.
22.2. The Client agrees not to reuse these electronic files, in whole or in part, for any purpose other than for the Project.
The Client agrees not to transfer these electronic files to others without the prior written consent of the Consultant.
The Client further agrees to waive all claims against the Consultant resulting in any way from any unauthorized
changes to or reuse of the electronic files for any other project by anyone other than the Consultant.
22.3. The Client and the Consultant agree that any electronic files furnished by either party shall conform to the project
specifications. Any changes to the electronic specifications by either the Client or the Consultant are subject to review
and acceptance by the other party. If the Consultant is required to expend additional effort to incorporate changes to
the electronic file specifications made by the Client, these efforts shall be compensated for as Additional Services.
22.4. Electronic files furnished by either party shall be subject to an acceptance period of fourteen (14) days during which
the receiving party agrees to perform appropriate acceptance tests. The party furnishing the electronic files shall
correct any discrepancies or errors detected and reported within the acceptance period. After the acceptance period,
the electronic files shall be deemed to be accepted and neither party shall have any obligation to correct errors or
maintain electronic files.
22.5. The Client is aware that differences may exist between the electronic files delivered and the printed hard-copy
construction documents. In the event of a conflict between the signed construction documents prepared by the
Consultant and electronic files, the signed or sealed hard-copy constructions shall govern.
22.6. In addition, the Client agrees, to the fullest extent permitted by law, indemnify and hold harmless the Consultant, its
officers, directors, employees and subconsultants (collectively, Consultant) against all damages, liabilities or costs,
including reasonable attorneys’ fees and defense costs, arising from any changes made by anyone other than the
Consultant from any reuse if the electronic files without the prior written consent of the Consultant.
22.7. Under no circumstances shall delivery of electronic file for use by the Client be deemed a sale by the Consultant, and
the Consultant makes no warranties, either express or implied, of merchantability and fitness for any particular
purpose. In no event shall the Consultant be liable for indirect or consequential damages as a result of the Client’s
use or reuse of the electronic files.
23. Construction Phase Services.
55
23.1. If the Consultant’s services include the preparation of documents to be used for construction and SW+ is not retained
to make appropriate site observation visits, the Client assumes all responsibility for interpretation of the documents
and for construction observation. It is further agreed that the Client will defend, indemnify and hold harmless
Consultant from any claim or suit whatsoever, including but not limited to all payments, expenses or costs involved,
arising from the contractor’s performance or the failure of the contractor’s work to conform to the design intent and
the contract documents.
23.2. If the Consultant provides construction phase services, the Consultant shall have no responsibility for any contractor’s
means, methods, techniques, equipment choice and usage, sequence, schedule, safety programs, or safety
practices, nor shall SW+ have any authority or responsibility to stop or direct the work of any contractor. The
Consultant’s observation visits will be for the purpose of endeavoring to provide the Client a greater degree of
confidence that the completed work of its contractors will generally conform to the construction documents prepared
by the Consultant. The Consultant neither guarantees the performance of contractors, nor assumes responsibility
for any contractor’s failure to perform its work in accordance with the contract documents.
23.3. The Client agrees that it would be unfair to hold Consultant liable for problems that might occur should Consultant’s
plans, specifications or design intents not be followed, or for problems resulting from others’ failure to obtain and/or
follow Consultant’s guidance with respect to any errors, omissions, inconsistencies, ambiguities or conflicts which
are detected or alleged to exist in or as a consequence of implementing Consultant’s plans, specifications or other
instruments of service. Accordingly, the Client waives any claim against Consultant, and agrees to defend, indemnify
and hold Consultant harmless from any claim for injury or losses that results from failure to follow Consultant’s plans,
specifications or design intent, or for failure to obtain and/or follow Consultant’s guidance with respect to any alleged
errors, omissions, inconsistencies, ambiguities or conflicts contained within or arising as a result of implementing
Consultant’s plans, specifications or other instruments of services. The Client also agrees to compensate Consultant
for any time spent and expenses incurred by Consultant’s prevailing fee schedule and expense reimbursement
policy.
23.4. The Consultant is not responsible for any duties assigned to the Consultant in the construction contract that are not
expressly provided for in this Agreement. The Client agrees that neither the professional activities of Consultant, nor
the presence of Consultant’s employees and sub-consultant at a construction site, shall relieve the general contractor
and any other entity of their obligations, duties and responsibilities including, but not limited to, construction means,
methods, sequence, techniques or procedures necessary for performing, superintending or coordinating all portions
of the work of construction in accordance with the contract documents and any health or safety precautions required
by any regulatory agencies. Consultant and its personnel have no authority to exercise any control over any
construction contractor or other entity or their employees in connection with their work or any health or safety
precautions. The Client agrees that the General Contractor is solely responsible for job safety and warrants that this
intent shall be made evident in the Client’s Agreement with the general contractor. The Client also agrees that the
Client, Consultant and Consultant’s subconsultants shall be indemnified and shall be made additional insureds under
the general contractor’s general liability insurance policy.
24. Certifications. The Consultant shall not be required to execute certifications or third-party reliance letters that are
inaccurate, that relate to facts of which the Consultant does not have actual knowledge, or warrant the existence of
conditions whose existence and accuracy the Consultant cannot ascertain, or that would cause the Consultant to violate
applicable rules of professional responsibility. The Client also agrees not to make resolution of any dispute with the
Consultant or payment of any amount due to the Consultant in any way contingent upon the Consultant’s signing any such
certification.
24.1. The Client shall indemnify and hold the Engineer harmless from and against any and all judgments, losses, damages,
and expenses (including attorney fees and defense costs) arising from or related to claims by third parties to challenge
the issuance of permits or certificates for the Project by agencies with jurisdiction in the premises. Defense costs shall
include the time and expenses of the Engineer’s personnel to assist in the defense of the issuance of the permit or
certificate.
25. Certifications, Guarantees and Warranties. The Consultant shall not be required to sign any documents, no matter by
whom they may be requested, that would result in the Consultant having to certify, guarantee or warrant the existence of
conditions which the Consultant cannot ascertain. The Client also agrees that it has no right to make the resolution of any
56
dispute with the Consultant or the payment of any amounts due to the Consultant in any way contingent upon the
Consultant’s signing any such certification.
25.1. The Client shall indemnify and hold the Consultant harmless from and against any and all judgments, losses, damages,
and expenses (including attorney fees and defense costs) arising from or related to claims by third parties to challenge
the issuance of permits or certificates for the Project by agencies with jurisdiction in the premises. Defense costs shall
include the time and expenses of the Engineer’s personnel to assist in the defense of the issuance of the permit or
certificate.
26. SWPPP Services. Where the Consultant provides SWPPP related services, the information contained in the SWPPP
represents a planning tool to assist the Client, and his co-permittees, in complying with environmental regulations during
the Project construction. The decisions on how to operate the construction site rest solely with the Client/co-permittees and
not with the Consultant. The Client agrees to indemnify the Consultant from damages and fines resulting from the
operational decisions of the Client/co-permittees, or the failure of the Client/co-permittees to follow the recommendations
as outlined in the SWPPP.
27. NPDES Permit. In instances where an NPDES Permit remains in effect beyond the termination of other services described
in this proposal, the Consultant’s responsibilities for SWPPP related services shall cease at a time concurrent with the
termination of other services. If the Client wishes for SWPPP-related services to continue beyond that time, they shall be
agreed to under a separate Contract.
28. Shop Drawing Review. The Consultant shall review and approve Contractor submittals, such as shop drawings, product
data, samples and other data, as required by the Consultant, but only for the limited purpose of checking for conformance
with the design concept and the information expressed in the contract documents. The review shall not include review of
the accuracy or completeness of details, such as quantities, dimensions, weights or gauges, fabrication processes,
construction means or methods, coordination of the work with other trades or construction safety precautions, all of which
are sole responsibility of the Contractor. The Consultant’s review shall be conducted with reasonable promptness while
allowing sufficient time in the Consultant’s judgment to permit adequate review. Review of specific item shall not indicate
that the Consultant has reviewed the entire assembly of which the item is a component. The Consultant shall not be
responsible for any deviations from the contract documents not brought to the attention of the Consultant in writing by the
Contractor. The Consultant shall not be required to review partial submissions or those for which submissions of correlated
items have not been received.
29. Signage. As used in this Agreement, the term sign shall mean any sign structure or combination of sign structure and
message in the form of outdoor sign, display, message, poster, billboard, advertisement, logo, symbol, or other form, which
is designated to advertise or inform, any part of a message or information contents.
29.1. Signs Required by Law. The Client agrees to allow the Consultant to adhere to the location of the professional
services provided by the Consultant, signs which are required by law, statute, or regulatory body to be displayed.
29.2. Consultant Sign. The Client agrees to allow the Consultant to adhere to the location of the professional services by
the Consultant, signs which advertise the Consultant’s professional services. The Client agrees to allow all signs to
remain at the location of the professional services for the duration of the Period of Services as defined in section 3 of
this Agreement. The Client may request the exact specifications of the signs prior to installation on or at the site.
29.3. Sign Permits. In the event the location of the professional services by the Consultant is located in a county,
municipality, or township, which requires pre-approval and/or permits to display signs, the Client will work with the
Consultant in a reasonable manner obtain the necessary permissions and/or approvals.
30. Definition of “Hazardous Materials”. As used in this Agreement, the term hazardous materials shall mean any
substances, including without limitation asbestos, toxic or hazardous waste, OCBs, combustible gases and materials,
petroleum or radioactive materials (as each of these is defined in applicable federal statues) or any other substances under
any conditions and in such quantities as would pose a substantial danger to persons or property exposed to such substances
at or near the Project site.
30.1. Hazardous Materials - Suspension of Services. Both parties acknowledge that the Consultant’s scope of services
does not include any services related to the presence of any hazardous or toxic materials. In the event the Consultant
or any other person or entity involved in the project encounters any hazardous or toxic materials, or should it become
known to the Consultant that such materials may be present on or about the jobsite or any adjacent areas that may
57
affect the performance of the Consultant’s services, the Consultant may, at its sole option and without liability for
consequential or any other damages, suspend performance of its services under this Agreement until the Client retains
appropriate qualified consultants and/or contractors to identify and abate or remove the hazardous or toxic materials
and warrants that the jobsite is in full compliance with all applicable laws and regulations.
30.2. Hazardous Substances and Conditions. This contract does not specifically address environmental pollution audits
at any level, testing or visual inspection for environmental risks of pollution or hazardous materials wither on or relating
to the site. Because of the Client waives any claim against the Consultant and agrees to defend, indemnify, and hold
the Consultant harmless for any alleged environmental risks or hazardous materials. We further recommend that
environmental audits, reports or cleanup be performed by the client in a timely manner and under separate contract.
31. Non-Solicitation. During the Period of Services as outlined in Provision 3 of this Agreement and ending one year following
the Termination of this Agreement or the completion of Professional Services by the Consultant, the Client shall not, without
prior written consent, directly or indirectly; (1) solicit or encourage any person to leave the employment of the Consultant or
its affiliates; or (2) hire, on behalf of the Client or any other person or entity, any person who has left the employment of the
Consultant within one year following the termination of that person’s employment with the Client or its affiliates. The Client
agrees that during the Period of Services by the Consultant and one year following the Termination of this Agreement, or
completion of the Professional Services by the Consultant as defined in this Agreement, that the Client will not, whether for
its own gain or for the gain of any other person or entity, interfere with the relationship of the Consultant or its affiliates with,
or endeavor to entice away from the Consultant, any person who during the Period of Services of this Agreement , was an
employee, investor, third-party vendor, or customer of the Consultant.
32. Corporate Protection. It is intended by the parties to this Agreement that the Consultant’s services in connection with the
Project shall not subject the Consultant’s individual employees, officers or directors to any personal legal exposure for the
risks associated with this Project. Therefore, and notwithstanding anything to the contrary contained herein, the Client
agrees that as the Client’s sole and exclusive remedy, any claim, demand or suit shall be directed and/or asserted only
against the Consultant, a South Carolina corporation, and not against any of the Consultant’s individual employees, officers
or directors.
58