RecordWell Data

Development Review Committee Meeting — Agenda Packet

Town of Bluffton · Beaufort County · Development Review Committee · meeting of Aug 12, 2026 · Agenda packets

Open the original document More from Town of Bluffton

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Development Review Committee Meeting Wednesday, August 12, 2026 at 1:00 PM Theodore D. Washington Municipal Building, Henry “Emmett” McCracken Jr. Council Chambers, 20 Bridge Street, Bluffton, SC AGENDA All Applications can be viewed on the Town of Bluffton’s Permit Finder page https://www.townofbluffton.us/permit/ I. CALL TO ORDER II. ROLL CALL III. PUBLIC COMMENT IV. OLD BUSINESS V. NEW BUSINESS 1. Cornerstone Church - New Riverside Campus (Development Plan): A request by Sturre Engineering on behalf of Cornerstone Church for review of a Final Development Plan application. The project consists of site improvements to accommodate a new assembly hall and offices for church operations including stormwater, parking and associated infrastructure. The property is zoned Agricultural (AG) and Rural Mixed Use (RMU) and consists of approximately 41.3 acres identified by tax map number R610 036 000 0014 0000 and located south of May River Road approximately 600 feet east of Stardust Lane. (DP-02-25-019597) (Staff - Dan Frazier) VI. DISCUSSION VII. ADJOURNMENT NEXT MEETING DATE: Wednesday, August 19, 2026 Page 1 Town of Bluffton, SC Development Review Committee Meeting Agenda August 12, 2026 “FOIA Compliance – Public notification of this meeting has been published and posted in compliance with the Freedom of Information Act and the Town of Bluffton policies.” In accordance with the requirements of Title II of the Americans with Disabilities Act of 1990 ("ADA"), the Town of Bluffton will not discriminate against qualified individuals with disabilities on the basis of disability in its services, programs, or activities. The Town of Bluffton Council Chambers are ADA compatible. Auditory accommodations are available. Any person requiring further accommodation should contact the Town of Bluffton ADA Coordinator at 843.706.4500 or adacoordinator@townofbluffton.com as soon as possible but no later than 48 hours before the scheduled event. Executive Session – The public body may vote to go into executive session for any item identified for action on the agenda. *Please note that each member of the public may speak at one public comment session and a form must be filled out and given to the Town Clerk. To submit a public comment online, please click here: https://www.townofbluffton.sc.gov/FormCenter/Town-15/Public-Comment-60 Public comment is limited to 3 minutes per speaker. Page 2 Final Technical Review Submission #: 1 Recieved: 07/09/2026 Completed: 08/07/2026 Reviewing Dept. Complete Date Reviewer Status Fire Department Review 08/07/2026 Dan Wiltse Revisions Required Comments: 1. Provide Exhibit showing that the provided turnaround will accommodate emergency apparatus. 2. Provide dry hydrant flow rates. This information was supposed to be provided in PDP. 3. Provide proposed maintenance plan for rejuvenation and maintenance of dry hydrants. 4. Once access to municipal water is provided, connection to fire protection is required. 5. Verify appropriateness of slopes in proposed Fire Lanes. Watershed Management Review DRC 08/06/2026 Samantha Crotty Revisions Required Comments: 1. Remove all notes on the civil plan set regarding “existing dirt/gravel roadway improvements” since the LOD has been reduced to not include land disturbance associated with those particular improvements. 2. Add proposed contour labels back to the grading plan and within the raingardens. 3. Verify accuracy of Bioretention Spillway table (RGP6) in the civil plans [page 26/37]. 4. Revise Post-Development land cover sheet [page 30/37] to include accurate LOD boundary. 5. Revise Pre- and Post-Development land cover tables [page 30/37] to match the updated compliance calculator land cover values. 6. Landscape plan shows trees to be removed outside of the LOD. Revise landscape plan to not include removal of these trees or make note on the landscape plans to not remove the roots and stumps. 7. Revise project narrative to include accurate BMP names (raingardens vs infiltration basins). 8. A fully executed BMP Maintenance Agreement must be provided prior to final approval. (SWDM 2.2.1) 9. A stormwater surety will be required prior to land-disturbance. (UDO 3.13.2.B) Planning Commission Review 08/07/2026 Caroline Luke Approved with Conditions Comments: Planning Commission comments may be provided at time of DRC Meeting. Planning Review - Senior 08/07/2026 Dan Frazier Approved with Conditions 11 Grassey Lane BLUFFTON, SC 29910 A request by Sturre Engineering on behalf of Cornerstone Church for approval of a Preliminary Development Plan application. The project consists of site improvements to accommodate a new assembly hall and offices for church operations including stormwater, parking and associated infrastructure. The property is zoned Agricultural (AG) and Rural Mixed Use (RMU) and consists of approximately 41.3 acres identified by tax map number R610 036 000 0014 0000 and located south of May River Road approximately 600 feet east of Stardust Lane. STATUS: This item was heard at the March 26, 2025 Development Review Committee meeting. STATUS: The Preliminary Development Plan was approved at the April 23, 2025 Planning Commission Meeting. STATUS 8/7/26: Final Development Plan Application comments will be heard at the August 12, 2026, meeting of the Development Review Committee. Dan Frazier 02/14/2025 Active R610 036 000 0014 0000 Development Plan Plan Description: Case Manager: Plan PIN #: Plan Address: Plan Status: Apply Date: Plan Type: PLAN REVIEW COMMENTS FOR DP-02-25-019597 Town of Bluffton Department of Growth Management 20 Bridge Street P.O. Box 386 Bluffton, South Carolina 29910 Telephone 843-706-4522 NEW RIVERSIDE VILLAGE Page 1 of 208/07/2026 Page 3 Section V. Item #1. Comments: 1 . Verify existing and proposed road surfaces. 2 . There are proposed tree removals outside of the Limits of Disturbance (LOD). Confirm if the proposed tree removals are correct as shown. Planning Review - Address 08/07/2026 Ethan Greeley Approved Transportation Department Review 07/16/2026 Megan Andrews Approved Comments: No comments Page 4 Section V. Item #1.

Source: Town of Bluffton website. First collected Nov 7, 2026.