Historic Preservation Review Committee Meeting — Agenda Packet
Town of Bluffton · Beaufort County · Historic Preservation Review Committee · meeting of Aug 3, 2026 · Agenda packets
Open the original document More from Town of Bluffton
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Historic Preservation Review Committee Meeting
Monday, August 03, 2026 at 4:00 PM
Theodore D. Washington Municipal Building, Henry “Emmett” McCracken Jr. Council Chambers,
20 Bridge Street, Bluffton, SC
AGENDA
I. CALL TO ORDER
II. ROLL CALL
III. PUBLIC COMMENT
IV. OLD BUSINESS
V. NEW BUSINESS
1. 36 Bruin Road: A request by Court Atkins Group, Applicant, on behalf of ABPAL LLC, Owner,
for an amended Certificate of Appropriateness-HD to add an exterior elevator shaft to a two-
story commercial building of approximately 3,000 SF presently under construction at 36 Bruin
Road in the Old Town Bluffton Historic District and zoned Neighborhood General-HD (COFA
05-25-019766) (Staff - Charlotte Moore)
VI. DISCUSSION
VII. ADJOURNMENT
NEXT MEETING DATE: Monday, August 10, 2026
Page 1
Town of Bluffton, SC Historic Preservation Review Committee Meeting Agenda August 03, 2026
“FOIA Compliance – Public notification of this meeting has been published and posted in compliance
with the Freedom of Information Act and the Town of Bluffton policies.”
In accordance with the requirements of Title II of the Americans with Disabilities Act of 1990 ("ADA"), the
Town of Bluffton will not discriminate against qualified individuals with disabilities on the basis of
disability in its services, programs, or activities. The Town of Bluffton Council Chambers are ADA
compatible. Auditory accommodations are available. Any person requiring further accommodation
should contact the Town of Bluffton ADA Coordinator at 843.706.4500 or
adacoordinator@townofbluffton.com as soon as possible but no later than 48 hours before the
scheduled event.
Executive Session – The public body may vote to go into executive session for any item identified for
action on the agenda.
*Please note that each member of the public may speak at one public comment session and a form must
be filled out and given to the Town Clerk. To submit a public comment online, please click here:
https://www.townofbluffton.sc.gov/FormCenter/Town-15/Public-Comment-60
Public comment is limited to 3 minutes per speaker.
Page 2
36 Bruin Rd Road
BLUFFTON, SC 29910
A request by Court Atkins Group, Applicant, on behalf of ABPAL LLC, Owner, for a Certificate of
Appropriateness-HD to construct a new two-story commercial building of approximately 3,000 SF at 36 Bruin
Road (R610 039 000 0274 0000). This parcel located in the Old Town Bluffton Historic District and is zoned
Neighborhood General-HD (COFA 05-25-019766).
STATUS (06.24.2025). Scheduled for 6/30 HPRC meeting.
STATUS (06.30.2025). Reviewed at 6/30 HPRC meeting. Awaiting final submission.
STATUS (07.15.2025): Scheduled for August 6, 2025 HPC meeting.
STATUS (08.06.2025): HPC approved with conditions. Awaiting resubmission.
NOTE (08.14.2025): Property is addressed as 36 Bruin (subdivided from 32 Bruin).
STATUS (08.22.2025): Final Plan stamped and approved.
STATUS (01.06.2026): Amendment 1 scheduled for the January 7, 2026 HPC meeting.
STATUS (01.07.2026): Amendment 1 approved at January 7 HPC meeting with conditions; awaiting updated
Final Plan.
STATUS (02.05.2026): Final Plan Amendment 1 approved.
STATUS (07.21.2026): Amendment 2 to add an exterior elevator shaft/relocate service yard to be reviewed by
HPRC on August 3, 2026.
Charlotte Moore
05/22/2025
Active
R610 039 000 1755 0000
Historic District
Plan Description:
Case Manager:
Plan PIN #:
Plan Address:
Plan Status:
Apply Date:
Plan Type:
PLAN REVIEW COMMENTS FOR COFA-05-25-019766
Town of Bluffton
Department of Growth Management
20 Bridge Street P.O. Box 386 Bluffton, South Carolina 29910
Telephone 843-706-4522
Page 1 of 3
07/31/2026
Page 3
Section V. Item # 1.
HPRC Comments
1
. Provide an updated site plan showing how the proposed changes relate to the setback, property lines, and other site
improvements for Final HPC review.
2
. Provide an updated landscape plan for Final HPC review.
3
. The design breaks down the scale of the rear elevation, but not the sides. Chimneys and fireplaces are not usually
8
feet deep.
Study the massing of the side elevations for a solution that breaks down the scale of the elevator in a way that makes sense with the
story of the
“
fireplace and chimney
”
look. The chimney portion extending above the roof is also very deep and dwarfs what is a very
large
24
”
square chimney pot.
4
. The
“
chimney pot
”
on top of the elevator shaft is out of scale with the width of the chimney. Consider multiples or some other
solution to better terminate the massive chimney.
5
. What is the waterproofing cap material on top of the shaft?
6
. How deep is the stucco recess? The recessed depth appears to be negligible in the perspectives.
7
. The chimney needs a cap. How will it drain?
8
. Concern expressed regarding a second amendment for new construction and the effect on scale and the side yard setback.
Growth Management Staff Comments
1
. The COFA application indicates that
“
minor exterior changes
”
are proposed but changes are more extensive and include the
expansion of the porch (length, width and height) and related changes (additional columns, rear louver screening, openings),
addition of an elevator shaft/chimney, relocation of stairs and service yard, and addition of a freezer and a new rear door in an area
previously identified to the HPC as porch.
2
. Building permit set shows a freezer and ice machine on the porch but they do not appear on the amended plans. All exterior
equipment must be shown and screened.
3
. Within the NG-HD district, building form and scale shall be primarily residential to maintain the predominantly residential character
component of this district (UDO Sec.
5.15.5
.C.) Further, features, such as chimneys, shall have a proportional relationship to other
features as well as the building form (UDO Sec.
5.15.5
.F.
4
.a.). The chimney seems disproportionately large for the building,
particularly for a porch location, and the use of a clay chimney pot with a tabby shell chimney is an atypical combination of materials
for Old Town. What clay is proposed?
4
. The service yard seems unnecessarily large for the equipment shown.
5
. If the space for Tenant
2
is to be an extension of the restaurant, the amount of required parking will increase. An amended
Development Plan would be required.
6
. Correct plan name
—
shows as LAPBA and ABPAL Shell Building.
Plan Review Case Notes:`
Page 3 of 3
07/31/2026
Page 4
Section V. Item # 1.
Source: Town of Bluffton website. First collected Nov 7, 2026.