Public Works Committee Meeting september 2022
City of Mauldin · Greenville County · meeting of Sep 2, 2022 · Notices
Open the original document More from City of Mauldin
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
PUBLIC WORKS
COMMITTEE MEETING
TUESDAY, SEPTEMBER 6, 2022 | 6 PM
5th committee meeting
The Committee will meet in Mauldin City Hall at 5 East
Butler Road in the Council Chambers at 6 p.m.
The meeting will be available remotely through Zoom. Please visit the City’s website at
https://cityofmauldin.org/your-government/meeting-minutes-agendas/ to access the
meeting via audio and videoconferencing.
A quorum of Council will be present.
1
PUBLIC WORKS COMMITTEE MEETING
SEPTEMBER 6, 2022, 6PM
CITY HALL - COUNCIL CHAMBERS
5 E. BUTLER ROAD
Committee Members: Jason Kraeling (Chair), Carol King, Michael Reynolds
1. Call to Order
2. Public Comment
3. Reading and Approval of Minutes
a.Public Works Committee Meeting: August 1,
2022 [Pages 3-4]
4. Reports or Communications from City Officers
a. Public Works Director Matt Fleahman
Budget Review
b.Maverick Yards Maintenance [Pages 5-7]
c.Mosquito Spraying Program Analysis [Pages 8-10]
5. Unfi
nished Business
There is no unfinished business.
6. New Bus
iness
a.Sewer Rehab Program Contract [Pages 11-213]
b.Missed Garbage Can Fee [Pages 214-215]
c.Side-Arm Trash Truck Purchase [Page 216]
d.Stormwater Engineering Task Order 02 [Pages 217- 307]
7. Publ
ic Comment
8. Committee Concerns
9. Adjournment
The Honorable Jason Kraeling
The Honor
able Jason Kraeling
The Honor
able Jason Kraeling
The H
onorable Jason Kraeling
The Ho
norable Jason Kraeling
The
Honorable Jason Kraeling
The
Honorable Jason Kraeling
The
Honorable Jason Kraeling
The
Honorable Jason Kraeling
2
MINUTES
PUBLIC WORKS COMMITTEE MEETING
AUGUST 1, 2022, 6PM
CITY HALL - COUNCIL CHAMBERS
5 E. BUTLER ROAD
2nd committee meeting
Co
mmittee Members present: Jason Kraeling (Chair), Carol King, Michael Reynolds
Others present: PW Director Matt Fleahman and Interim City Administrator Rebecca Vance
1. Call t
o Order- Chairman Kraeling
2.
Public Comment- None
3. Re
ading and Approval of Minutes
a. Public Works Committee Meeting: July 5, 2022
M
otion: Councilwoman King made a motion to approve the minutes with Councilman Kraeling
seconding. Councilman Reynolds was not present at the July committee meeting and will not vote.
V
ote: The vote was unanimous (2-0).
4. Re
ports or Communications from City Officers
a. Public Works Director Matt Fleahman
Budget Review- Mr. Fleahman reported all Public Works divisions are at least 96-98% of their
budgets.
Mr.
Fleahman reported the sewer lines at Bridgeway Station have been relined.
Basin 5 point repairs were completed last week.
Road paving will begin next week.
A third side-arm truck is on the road and the fourth should be here in about a week.
Enterprise Asset will be onsite to start implementation of the new software.
C
hairman Kraeling asked if the sidearms would replace our entire sanitation truck fleet. Mr.
Fleahman answered yes. The older trucks will be sold to help offset some of the expenditures.
C
hairman Kraeling asked about implementation of a fee if Public Works has to make an extra trip to
pick up a resident’s trash when they forget to put their trash can out. Mr. Fleahman said it would
be hard to do, but he would compile some information on what other municipalities do.
5. Un
finished Business- There is no unfinished business.
6. Ne
w Business- There is no new business.
3
7. Public Comment
Diane Kuzniar: I am Diane Kuzniar from 503 Knollwood Drive. If their cans are not put out, the trash
doesn’t get picked up. If I forgot to put my can out, I am not going to call and say come back and get
it.
8. Committee Concerns
Councilman Reynolds asked about the mosquito spraying. Chairman Kraeling said he did some
research on one of the concerns, which was the chemicals being harmful to bees. The chemicals we
use are not strong enough to cause them harm. Mosquitoes are much smaller than bees. The City
is still looking at other options. There are other chemicals that could be used. There is money
to purchase something different if council wants to change. Mr. Fleahman said he should have
information for committee next month, to include staff time and truck costs for spraying.
9. Adjournment- Chairman Kraeling adjourned the meeting at 6:28 p.m.
Respectfully Submitted,
Cindy Miller
Municipal Clerk
4
PUBLIC WORKS COMMITTEE
AGENDA ITEM
MEETI
NG DATE: September 6, 2022
AGE
NDA ITEM: 4b
TO:
Public Works Committee
FROM: Public Works Director, Matthew Fleahman
SUBJECT: Maverick Yards Maintenance
REQUEST
Information only – to provide an estimate for the total costs associated with the maintenance of Maverick
Yards by the Parks Division of the Public Works Department.
HISTORY/BACKGROUND
During the August 2022 City Council Meeting, Council requested that the Public Works Departme nt
evaluate the total costs associated with the maintenance of the Maverick Yards property and present it to
the Public Works Committee.
ANALYSIS or STAFF FINDINGS
Attached is a narrative of the total labor costs and fuel costs associated with the mainte nance of the
Maverick Yards property. The evaluation takes into consideration both the growing season and the dormant
season and the variable tasks necessary to maintain the property. It is determined that the realized cost to
the City for the Public Works Department to maintain the property is less than the quote submitted from a
third-party vendor.
FINANCIAL IMPACT
The cost associated the Public Works Department maintaining the property is approximately three thousand
dollars less than the proposed contract annually.
RECOMMENDATION
No recommendation is provided as this evaluation is for information only, no action is required.
5
CITY OF MAULDIN
MAULDIN PUBLIC WORKS
700 East Standing Springs Road
Simsponville, South Carolina 29680
August 19, 2022
Mauldin City Council
5 East Butler Road
Mauldin, South Carolina 29662
Sir/Madame:
Public Works has been tasked with evaluating the total cost to maintain the Maverick Yards property located
at the corner of US-276 and East Butler Road. An initial cost estimate from a contractor was submitted at
a cost of 11,500 dollars annually. Below is a summary of the related costs to conduct the work inhouse as
well as a narrative explaining how the figures were determined.
The maintenance of the property will be considered in two separate periods of time, both the growing season
and the dormant season. The growing season will be considered the months of April through October and
the dormant season will be November through March. Activities from staff will vary based these two
seasons; however, the tasks of picking up trash, pulling weeds, and blowing the parking lot will be routine
throughout the year. During the growing season staff will edge, weed eat, and cut grass in addition to the
routine tasks.
The following evaluation is based on approximately 6 weeks of continued maintenance of the property.
During the growing season, staff will be onsite twice per week for a total of 8 working hours. The growing
season will be 30 weeks long, so the total man hours will be 240 during this period. During the dormant
season, staff will be onsite once per week for a total of 4 working hours. The dormant season will be 22
weeks long, so the total man hours will be 88 during this period. A summation of both periods brings the
total man hours to 328 annually.
The average pay in the Parks Division is approximately 16.50 per hour. If we consider the fringe package
for each employee which includes insurance, retirement, etc. a value of 39% is used as a standard. This is
an approximate value provided by the City’s Human Resources Department. A multiplication of the total
hours (x) hourly rate (x) fringe benefits, a total labor cost for the year is determined at 7,522.68 dollars.
In addition to labor costs, the cost associated with fuel for the work needs to be included to better document
the total cost to the City. Fuel usage rates are not available for the Parks Division, so a nominal figure of
one gallon per hour has been utilized. At a total of 328 man hours it is calculated that 328 gallons of fuel
is used. At a cost of 3.30 dollars per gallon, the total fuel cost is presented as 1,082.40 dollars annually.
A total expenditure for the City of $7,522.68 (labor) and $1,082.40 (fuel) is determined to be $8,605.08
which is nearly three thousand dollars less than the proposed estimate. Below is a summary of the values
presented in this narrative:
6
CITY OF MAULDIN
MAULDIN PUBLIC WORKS
700 East Standing Springs Road
Simsponville, South Carolina 29680
April
- October
Hours a week: 8
Weeks total 30
Total Hours 240
Nov-March
Hours a week: 4
Weeks total: 22
Total Hours: 88
Total Annual
Hours: 328
Pay Rate: $16.50
Employee Cost: $5,412.00
Fringe Benefits 39%
Total Labor Cost: $7,522.68
Fuel Cost: $1,082.40
Total Cost to City: $8,605.08
It is
imperative that I also point out that the Parks Division of the Public Works Department has been
maintaining this property the entire time that I have been the Public Works Director. Because of that, these
proposed labor costs are already realized and do not represent any additional work proposed for the
Division.
Sincerely,
Matthew Fleahman
Director of Public Works
7
PUBLIC WORKS COMMITTEE
AGENDA ITEM
MEETI
NG DATE: September 6, 2022
AGE
NDA ITEM: 4c
TO:
Public Works Committee
FROM: Public Works Director, Matthew Fleahman
SUBJECT: Mosquito Spraying Program Evaluation
REQUEST
Information only – to provide an estimate for the total costs associated with the annual Mosquito Spraying
Program by the Parks Division of the Public Works Department.
HISTORY/BACKGROUND
During the August 2022 Public Works Committee Meeting, Council requested that the Public Works
Department evaluate the total costs associated with the annual Mosquito Spraying Program and present it
to the Public Works Committee.
ANALYSIS or STAFF FINDINGS
Attached is a narrative of the total labor costs, chemical costs, and fuel costs associated with the
maintenance of the annual Mosquito Spraying Program.
FINANCIAL IMPACT
The cost associated the Public Works Department annual Mosquito Spraying Program is $17,477.40.
RECOMMENDATION
No recommendation is provided as this evaluation is for information only, no action is required.
8
CITY OF MAULDIN
MAULDIN PUBLIC WORKS
700 East Standing Springs Road
Simsponville, South Carolina 29680
August 1
9, 2022
Mauldin City Council
5 East Butler Road
Mauldin, South Carolina 29662
Sir/Madame:
Public Works has been tasked with evaluating the total annual cost for its City-wide Mosquito Spraying
Program. The request was made during a Public Works Committee Meeting in response to concerns
brought forward to Committee from citizens. Below is a narrative of the related costs to conduct the City-
wide program and includes labor costs, chemical costs, and fuel costs.
The program runs annually from April through October. Public Works staff work in teams of two and
generally work six hours a night for four nights per month. The calculation of total annual hours is as
follows: 2 (staff members) x 6 (hours per night) x 4 (nights per month) x 7 (months) for a grand total of
336 hours.
The average pay rate for mosquito spraying is $17.50 per hour. The rate is greater than the average for the
Division because the staff members who conduct the work are more tenured and are licensed pesticide
applicators. Because the work is all after hours, the pay rate for employees is at time and a half. This pay
rate is thus $26.25 per hour. The total cost to the City includes not only staff pay, but the fringe package
associated with their employment. A rate of 39% has been provided by the City’s Human Resources
Department and covers insurance, retirement, etc. The labor cost is calculated as follows: 336 (annual
hours) x $26.25 (per hour) x 1.39 (fringe rate) for a total cost of $12,259.80 annually.
In addition to labor costs, the City also incurs the cost of fuel and of chemicals. The annual chemical costs
for the mosquito spraying program are $3,000. Fuel usage rates for the activity is not adequately tracked
for this evaluation so an estimate has been made based on the hours both the truck and the sprayer are in
operation. During the spraying the truck is driving in the range of 15 to 20 miles per hour. With a fuel
efficiency of approximately 17 to 20 miles per gallon, a usage rate of one gallon per hour for the truck is
applied. A similar usage rate for the sprayer was utilized in the calculation. At a cost of 3.30 dollars per
gallon and total hours of 336 (truck) and 336 (sprayer), a total fuel cost is determined at $2,217.60 annually.
A summation of the labor costs, chemical costs, and fuel costs equates to an annual cost of $17,477.40.
Below is a summary table of the values discussed above in this calculation:
April - October
Staff Members 2
Hours per employee 6
Nights per month 4
Total Months 7
Total Annual Hours 336
9
CITY OF MAULDIN
MAULDIN PUBLIC WORKS
700 East Standing Springs Road
Simsponville, South Carolina 29680
Pay Rate: $17.50
Overtime Rate $26.25
Employee Cost $8,820.00
Fringe Benefits 39.00%
Total Labor Cost $12,259.80
Fuel Cost $2,217.60
Chemical Cost $3,000.00
Total Cost to City: $17,477.40
Addit
ional costs could be added into this calculation to encompass the labor and materials for the
maintenance of the City-owned truck as well as depreciated value of for the equipment. These values were
left out because the equipment would depreciate whether or not its used, and the maintenance of the truck
is only increased one oil change per year. The oil change cost is insignificant to the total cost of the annual
program.
Sincerely,
Matthew Fleahman
Director of Public Works
10
PUBLIC WORKS COMMITTEE
AGENDA ITEM
MEETING DATE: September 6, 2022
AGENDA ITEM: 6a
TO: Public Works Committee
FROM: Public Works Director, Matthew Fleahman
SUBJECT: Sewer Rehabilitation Program
REQUEST
Authorization is requested to execute the attached contract between the City of Mauldin and CaJenn
Construction & Rehabilitation (C/O Frazier Engineering, P.A).
HISTORY/BACKGROUND
In the Council approved FY2022 budget, $600,000 was budgeted in the Sewer Division of the Public Works
Department for sewer rehabilitation. These monies were included in the Federal ARPA distribution from
October 2022. In the FY2023 Council approved budget, $734,925 was budgeted in the Sewer Division of
the Public Works Department for sewer rehabilitation. These monies are included in the Federal ARPA
distribution which will be received in October 2023.
The City of Mauldin (City) and Frazier Engineering (Engineer) entered into an Agreement dated March 15,
2015 for Engineering- Construction Management Services related to the City's Sewer Rehabilitation
Program. The contract has been amended to allow for the Engineer to provide general engineering services
related to the City's overall rehabilitation program and providing design and construction management
services for the City's sewer rehabilitation construction projects. The most recent amendments were made
during the December 2021 Council meeting to authorize the use of ARPA f unds to rehabilitate additional
sewer mainlines.
ANALYSIS or STAFF FINDINGS
CaJenn Construction & Rehabilitation is current doing sewer rehabilitation work for the City of
Simpsonville and Metro Connects. In both situations, Frazier Engineering is the consulting engineer on the
projects. The contracts with Metro and Simpsonville were competitive bid projects which Cajenn
Construction & Rehabilitation won. For the work in Mauldin, the Public Works Department asked if the
City could “piggy- back,” on either contract . Based on a review of both contracts, Frazier Engineering
determined that the Metro Connects contract was the “most similar,” to our proposed rehabilitation project.
In accordance with the Council approved Purchasing Policy, Cooperative Purchasing is an approved
alternative to the sealed bid method of soliciting bids. This method which is most advantageous to the City
and result s in the most timely, acceptable quality, economical, and successful completion of the
construction project.
11
FINANCIAL IMPACT
The cost associated with this contract will not exceed $1,200,000.
RECOMMENDATION
Staff recommends the Public Works Committee and the City Council approve the contract.
12
13
14
TABLE OF CONTENTS
Contents
AGREEMENT ................................................................................................................................................ 00200-1
BID .............................................................................................................................................................. 00310-1
PERFORMANCE BOND ................................................................................................................................. 00400-1
PAYMENT BOND ......................................................................................................................................... 00500-1
GENERAL CONDITIONS ................................................................................................................................ 00700-1
FORMS ........................................................................................................................................................ 00950-1
TECHNI
CAL SPECIFICATIONS
SECTION TITLE NO. OF PAGES
01010 SUMMARY OF WORK...................................................................................................................... ..31
01140 PROJEC
T ACCESS AND RESTRICTIONS ............................................................................................... 1
01200 PROJECT MEETINGS ..........................................................................................................................1
01270 MEASUREMENT AND PAYMENT.......................................................................................................1 7
01300 SUBMITTALS ......................................................................................................................................3
01340 SHOP DRAWINGS, WORKING DRAWINGS, AND SAMPLES ................................................................ 7
01410 REGULATORY REQUIREMENTS AND REFERENCES ............................................................................ 2
01510 TEMPORARY UTILITIES ...................................................................................................................... 1
01550 VEHICULAR ACCESS AND TRAFFIC CONTROL .................................................................................... 1
01560 TEMPORARY BARRIERS AND CONTROLS ........................................................................................... 2
01570 ENVIRONMENTAL PROTECTION ........................................................................................................1
01700 PROJECT CLOSEOUT ..........................................................................................................................1
01720 PROJECT RECORD DRAWINGS ........................................................................................................... 3
01725 EXISTING UTILITIES ............................................................................................................................2
01740 CLEANING ......................................................................................................................................... 1
02650 SEWER CLEANING AND TELEVISION INSPECTION ............................................................................. 8
02766 CURED-IN-PLACE PIPE LINING (CIPP) FOR LATERALS.........................................................................7
02767 CIPP FOR MAIN SEWERS - UV CURED ..............................................................................................17
02768 MANHOLE REHABILITATION ..............................................................................................................9
02900 LANDSCAPE RESTORATION................................................................................................................6
15
SECT
ION 00200
AGREEMENT
THIS AGREEMENT, made this ________ day of ___________________________, 20___, by and
between the City of Mauldin herein after called "OWNER" and CaJenn Construction & Rehabilitation
Services, Inc. of the City of Hoboken, County of Brantley, and State of Georgia, hereinafter called
"CONTRACTOR".
WITNESSETH: That for and in consideration of the payments and agreements hereinafter
mentioned:
1. The CONTRACTOR hereby agrees with the OWNER to commence and complete the
construction described as follows:
2022-2023 SEWER REHABILITATION PROJECT
hereinafter called the PROJECT.
2. This AGREEMENT is being entered into through a COOPERATIVE PURCHASING
AGREEMENT (“PIGGYBACK” AGREEMENT) process in accordance with Title 11,
Chapter 35, Section 11-35-4810 of the South Carolina Code of Laws. The OWNER is
entering into this AGREEMENT with the CONTRACTOR based on the CONTRACTOR’s
Bid for the FM400B-343 Basin Find & Fix CIPP Project submitted to the Metropolitan
Sewer Subdistrict (dba MetroConnects), Greenville, South Carolina on February 10,
2022, at which time the Bid was publicly opened and read aloud. The CONTRACTOR
subsequently entered into an AGREEMENT with MetroConnects to perform the work.
The OWNER (City of Mauldin) is undertaking similar work as Bid on the MetroConnects’
FM400B-343 Basin Find & Fix CIPP Project, and via this AGREEMENT, the
CONTRACTOR agrees to perform the OWNER’s work in accordance with the terms,
conditions and specifications of the MetroConnects’ Contract Documents (except as
modified herein) at the unit prices bid on February 10, 2022.
The Contract Documents bound with this AGREEMENT are directly incorporated from
the MetroConnects’ Contract with the CONTRACTOR for the FM400B-343 Basin Find &
Fix CIPP Project. Any modifications to the Contract Documents are as defined in Item 6
below.
3. The CONTRACTOR will furnish all of the materials, supplies, tools, equipment, labor, and
other services necessary for the construction and completion of the PROJECT descr ibed
herein.
4. The CONTRACTOR will commence work required by the CONTRACT DOCUMENTS
within fifteen (15) calendar days after the date of the NOTICE TO PROCEED and will
fully complete the PROJECT within 365 calendar days from the date of the NOTICE TO
PROCEED unless the period for completion is extended otherwise by the OWNER via
change order(s). The CONTRACTOR further agrees to pay, as liquidated damages, the
16
sum of seven hundred fifty dollars ($750) for each consecutive calendar day thereafter as
herein provided in the SPECIAL PROVISIONS.
5. The CONTRACTOR agrees to perform all of the WORK described in the CONTRACT
DOCUMENTS and comply with the terms therein for an amount of up to ($1,200,000)
One Million Two Hundred Thousand Dollars and No Cents based on the actual work
performed at the unit prices shown in the Bid Schedule. The OWNER may increase this
Contract Amount via change order(s) to complete additional sewer rehabilitation work.
6. The term "CONTRACT DOCUMENTS" means and includes the following:
A. Agreement – Section 00200
B. Bid – Section 00310 : The Bid included herein is the C ONTRACTOR’S Bid
submitted to MetroConnects for the FM400B-343 Basin Find & Fix CIPP Project on
February 10, 2022. The OWNER will utilize the same Bid Items for this PROJECT,
and the CONTRACTOR shall honor the unit prices bid as shown on the Bid Form.
C. Performance Bond – Section 00400
D. Payment Bond – Section 00500
E. General Conditions – Section 00700
F. Special Provisions – Section 01 010: The Special Provisions included in these
Contract Documents have been modified to reflect the specific project requirements
for the OWNER’s PROJECT.
G. Specifications directly incorporated from the MetroConnects ’ FM400B-343 Basin
Find & Fix CIPP Project as enumerated in the Table of Contents.
H. N otice to Proceed
I. Change Orders
J. Drawings as prepared by Frazier Engineering, P.A. and issued to the
CONTRACTOR during construction of this PROJECT. In addition, the Drawings
prepared by Frazier Engineering, P.A. for the MetroConnects’ FM400B-343 Basin
Find & Fix CIPP Project dated January 2022 are incorporated herein by reference,
specifically the general requirements on Sheet G-1, the Technical Details shown on
Sheets D-1 through D-7, and the Erosion Control Details shown on Sheets EC -1
through EC-2.
K. These Specifications prepared by Frazier Engineering, P.A. dated August 2022.
7. The OWNER agrees to pay the CONTRACTOR in the manner and at such times as set
forth in the General Conditions such amounts as required by the CONTRACT
DOCUMENTS.
8. This Agreement shall be binding on all parties hereto and their respective heirs,
executors, administrators, successors and assigns.
17
IN WITNESS WHEREOF, the parties hereto have executed or caused to be executed by their
duly authorized officials, this Agreement in three (3) counterparts, each of which shall be deemed
an original, in the year and day first above written.
City of Mauldin
(OWNER)
By:_____________________________________
(SEAL) _________________________________________
ATTEST _ ________________________________________
(Title of Authorized Official)
__________________________________________
(Witness)
__________________________________________
(Witness)
CaJenn Construction & Rehabilitation Services, Inc.
(CONTRACTOR)
By:____________________________________
______________________________________
(Printed Name)
______________________________________
(Title)
PO Box 38
Hoboken, GA 31542
(SEAL)
ATTEST:
__________________________________________
(Witness)
__________________________________________
(Witness)
(End of Section 00200)
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
SECTION 00400
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS: that
_____________________________________________________________________________
(Name of Contractor)
(Address of Contractor)
a ___________________________________________________, hereinafter called Principal and
(Corporation, Partnership or Individual)
(Name of Surety)
(Address of Surety)
hereinafter called Surety are held and firmly bound unto the
(Name of Owner)
(Address of Owner)
hereinafter called OWNER, in the penal sum of ________________________________________
_______________________________________Dollars, ($____________ _________________)
in lawful money of the United States, for the payment of which sum well and truly to be made, we
bind ourselves, successors, and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas the Principal entered into a certain
contract with the OWNER, dated the ______________ day of ___________________,
20________, a copy of which is hereto attached and made a part thereof for the construction of:
2022-2023 SEWER REHABILITATION PROJECT
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the
undertakings, covenants, terms, conditions, and agreements of said contract during the original
term thereof, and any extensions thereof which may be granted by the OWNER, with or without
notice to the Surety and during the one- year guaranty period, and if he shall satisfy all claims and
demands incurred under such contract, and shall fully indemnify and save harmless the OWNER
from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse
and repay the OWNER all outlay and expense which the OWNER may incur in making good any
default, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that
no change, extension of time, alteration or addition to the terms of the contract or to the WORK to
be performed thereunder or the SPECIFICATIONS accompanying the same shall in any wise affect
its obligation on this BOND, and it does hereby waive notice of any such change, extension of time,
alteration, or addition to the terms of the contract of to the WORK or to the SPECIFICATIONS.
33
PROV
IDED, FURTH ER, that no final settlement between the OWNER and the CONTRACTOR
shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied.
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which
shall be deemed an original, this the _____________ day of _________________________,
20________.
________________________________
ATTEST Principal
____________________________________
(Principal) Secretary By:_____________________________(S)
(SEAL)
_________________________________
Address
________________________________
____________________________________
Witness as to Principal
____________________________________
Address
____________________________________ __________________________________
Surety
ATTEST: By:_______________________________
Attorney-in-fact
____________________________________
(Surety) Secretary _________________________________
Address
________________________________
____________________________________
Witness as to Surety
____________________________________
Address
____________________________________
NOTE: Date of BOND must not be prior to date of Contract. If CONTRACTOR is Partnership, all
partners should execute BOND.
IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's
most current list (Circular 570 as amended) and be authorized to transact business in the State
where the PROJECT is located.
(End of Section 00400)
34
SECTION 00500
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS: that
_____________________________________________________________________________
(Name of Contractor)
_______________________________________________________________________________
(Address of Contractor)
________________________________________________________________, hereinafter called
(an individual), (a Partnership), or (a Corporation)
Principal, and ___________________________________________________________________
(Name of Surety)
_______________________________________________________________________________
(Address of Surety)
hereinafter called Surety, are held and firmly bound unto __________________________________
_______________________________________________________________________________
(Name of Owner)
_______________________________________________________________________________
(Address of Owner)
hereinafter called OWNER, in the penal sum of _________________________________________
________________________________________ Dollars, ($ ) in lawful money of
the United States, for the payment of which sum well and truly to be made, we bind ourselves,
successors, and assigns, jointly and severally, firmly, by these presents.
THE CONDITION OF THE OBLIGATION is such that whereas, the Principal entered into a certain
contract with the OWNER, dated the __________ day of _______________________, 20_______,
a copy of which is hereto attached and made a part hereof for the construction of:
2022-2023 SEWER REHABILITATION PROJECT
NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms,
SUBCONTRACTORS, and corporations furnishing materials for or performing labor in the
prosecution of the WORK provided for in such contract, and any authorized extension or modification
thereof, including all amounts due for materials, lubricants, oil, fuel, repairs on machinery, equipment
and tools, consumed or used in connection with the construction of such WORK, and all insurance
premiums on said WORK, and for al l labor, performed on such WORK, whether by
SUBCONTRACTOR or otherwise, then this obligation shall be void; otherwise to remain in full force
and effect.
PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that no
change, extension of time, alteration or addition to the terms of the contract or to the WORK to be
performed thereunder or the SPECIFICATIONS accompanying the same shall in any wise affect its
35
obli
gation on this BOND, and it does hereby waive notice of any such change, extension of time,
alteration, or addition to the terms of the contract or to the WORK or to the SPECIFICATIONS.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall
abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which
shall be deemed an original, this the _____________ day of _________________________,
20________.
_________________________________
ATTEST: Principal
_____________________________________
(Principal) Secretary By:_____________________________(S)
(SEAL)
__________________________________
Address
_________________________________
_____________________________________
Witness as to Principal
_____________________________________
Address
_____________________________________
__________________________________
Surety
ATTEST:
By:_______________________________
Attorney-in-fact
_____________________________________
(Surety) Secretary
__________________________________
Address
(SEAL)
_________________________________
_____________________________________
Witness as to Surety
_____________________________________
Address
_____________________________________
NOTE: Date of BOND must not be prior to date of Contract. If CONTRACTOR is a Partnership,
all partners should execute BOND.
IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's
most current list (Circular 570 as amended) and be authorized to transact business in the State
where the PROJECT is located.
(End of Section 00500)
36
SECTION 00700
GENERAL CONDITIONS
1. GENERAL:
1.1 THE CONTRACT DOCUMENTS:
1.1.1 The Contract Documents consist of the Advertisement for Bids, Information
for Bidders, Bid, Bid Bond, Agreement, Payment Bond, Performance Bond,
Conditions of the Contract (General Conditions, Special Provisions and
Other Conditions), Material and Technical Specifications, Drawings,
Addenda, Notice of Award, Notice to Proceed and Change Orders.
1.2 CORRELATION AND INTENT OF DOCUMENTS:
1.2.1 The Contract Documents are complementary, and what is required by any
one shall be as binding as if required by all.
1.2.2 The intent of the Drawings and Specifications is that the Contractor shall
furnish all labor, supplies and materials, tools, machinery, equipment,
transportation, supervision, temporary construction of any nature, and all
other services, facilities and means necessary for the proper execution and
completion of the work in accordance with the Contract Documents and all
incidental work necessary to complete the project in an acceptable manner,
and fully complete the work or improvement ready for use, occupancy and
operation by the Owner.
1.2.3 Any mention in the Specifications or indication on the Drawings of articles,
materials, methods or operations shall require the Contractor to furnish such
item or service as if it was fully specified unless it is noted or specified as
not in the contract. It is intended that all materials shall be new and best
quality in every respect unless otherwise noted or specified. All
workmanship, methods of assembly, and erection shall be first class in
every respect.
1.3 CONFLICT OR INCONSISTENCY:
1.3.1 If there is any conflict or inconsistency between the provisions of the Special
Provisions and the provisions of the other Contract Documents, the
provisions of the Special Provisions shall prevail. If there is any conflict or
inconsistency between the provisions of the General Conditions and the
provisions of any of the Contract Documents other than the Special
Provisions, the provisions of the General Conditions shall prevail.
1.3.2 In the case of conflict between the Drawings and Specifications, the
Specifications shall govern. Figure dimensions on Drawings shall govern
over scale dimensions, and detailed Drawings shall govern over general
Drawings.
1.3.3 In case of difference between small-scale and large-scale drawings, the
large-scale drawings shall govern. Schedules on any contract drawing shall
take precedence over conflicting information on that or any other contract
drawing. On any of the drawings where a portion of the work is detailed or
drawn out and the remainder is shown in outline, the parts detailed or drawn
out shall apply also to all other like portions of the work. Where the word
"similar" occurs on the drawings, it shall have a general meaning and not be
37
inter
preted as being identical, and all details shall be worked out in relation
to their location and their connection with other parts of the work.
1.3.4 Any discrepancies found between the Drawings and Specifications and site
conditions or any inconsistencies or ambiguities in the Drawings or
Specifications shall be immediately reported to the Engineer, in writing, who
shall promptly correct such inconsistencies or ambiguities in writing. Work
done by the Contractor after his discovery of such discrepancies,
inconsistencies or ambiguities shall be done at the Contractor's risk.
1.3.5 Should a conflict be discovered within the Contract Documents, the
Contractor shall be deemed to have estimated the higher quality way of
doing the work unless he shall have asked for and obtained a decision in
writing from the Engineer before entering into this contract.
1.4 ADDITI
ONAL INSTRUCTIONS AND DETAIL DRAWINGS:
1.4.1 The Contractor may be furnished additional instructions and detail drawings,
by the Engineer, as necessary to carry out the work required by the Contract
Documents. The additional drawings and instructions thus supplied will
become a part of the Contract Documents. The Contractor shall carry out
the work in accordance with the additional detail drawings and instructions.
1.5 SPECIFICATION HEADINGS:
1.5.1 For convenience of reference, these Specifications are divided into various
Divisions, Sections, Subsections and Paragraphs. The titles of these
headings shall not be taken as a correct or complete segregation of the
various types of material and labor nor as an attempt to outline jurisdictional
procedures. The headings shall not be deemed to limit or restrict the
content, meaning or effect of such section, subsection, paragraph, provision
or part.
1.5.2 The organization of the Specifications into the various headings, and the
arrangement of Drawings shall not control the Contractor in dividing the
work among subcontractors or in establishing the extent of the work to be
performed by any trade. Each subcontract shall be dependent upon its own
definite confines, regardless of Divisions of these Specifications. No
responsibility, either direct or implied, is assumed by the Owner for
omissions or duplications by the Contractor or by any of his subcontractors
due to real or alleged errors in arrangement of matter in Contract
Documents.
1.6 DRAWING
S AND SPECIFICATIONS FOR CONSTRUCTION PURPOSES:
1.6.1 The Contractor will be furnished five (5) complete sets of Drawings and
Specifications to be used during the course of construction. If more than
five (5) sets are needed, the Contractor will be required to pay the actual
cost of printing and handling.
1.7 DEFINITIONS:
1.7.1 Wherever the words hereinafter defined or pronouns used in their stead
occur in the Contract Documents, they shall have the following meanings:
1.7.1.1 ADDEN DA: Written or graphic instruments issued prior to the
execution of the Agreement which modify or interpret the Contract
Documents, Drawings and Specifications by additions, deletions,
clarifications or corrections. Such addendum or addenda will take
38
precede
nt over the position of the general drawings and
specifications concerned and will be considered as part of the
Contract Documents.
1.7.1.2 AGRE EMENT: The Agreement represents the entire and
integrated agreement between the parties hereto and supersedes
all prior negotiations, representations or agreements either written,
or oral, including the bidding documents. The Agreement may be
amended or modified by a Change Order.
1.7.1.3 BID:
The written offer or proposal of the bidder, submitted on the
prescribed form, properly signed and guaranteed, to perform the
work at the prices quoted by the bidder.
1.7.1.4 BID BO ND: The security furnished by the bidder with his
proposal for the project as guaranty he will enter into a contract for
the work if his proposal is accepted.
1.7.1.5 BIDDE R: Any individual, firm or corporation or combination of
same submitting a bid for the work contemplated, acting directly or
through a duly authorized representative.
1.7.1.6 BONDS: B id, Performance and Payment Bonds and other
instruments of security furnished by the Contractor and his Surety
in accordance with the Contract Documents.
1.7.1.7 CALE NDAR DAY: Every day shown on the calendar, Sundays
and Holidays included.
1.7.1.8 CHANGE ORDER: A written order to the Contractor authorizing
an addition, deletion or revision in the work within the general
scope of the Contract Documents, or authorizing an adjustment in
the contract price or contract time.
1.7.1.9 CONT RACT: The Contract Documents form the contract. The
contract represents the entire and integrated agreement between
the parties hereto and supersedes all prior negotiations,
representations or agreements, either written or oral, including the
bidding documents. The contract may be amended or modified by
a Change Order.
1.7.1.10 CONT
RACT DOCUMENTS: The Contract Documents consist of
the Advertisement for Bids, Information for Bidders, Bid, Bid Bond,
Agreement, Payment Bond, Performance Bond, the Conditions of
the Contract (General, Supplemental, and other Conditions), the
Drawings, the Material and Technical Specifications, Addenda
issued prior to execution of the Contract, Notice of Award, Notice
to Proceed and Change Orders.
1.7.1.11 CONT
RACT PRICE: The total monies payable to the Contractor
under the terms and conditions of the Contract Documents.
1.7.1.12 CONT RACTOR: The individual, firm or corporation with whom
the Owner has executed the Agreement by which the Contractor
is obligated directly, or through subcontractors, to perform work in
connection with the project. The Contractor is the person or
organization identified as such in the Agreement and is referred to
throughout the Contract Documents as if singular in number and
masculine in gender. The term Contractor means the Contractor
39
or his
authorized representative.
1.7.1.13 CONT RACT TIME: The number of calendar days stated in the
Contract Documents for completion of the work.
1.7.1.14 DRAWI NGS: The part of the Contract Documents which show
the characteristics and scope of the work to be performed and
which have been prepared or approved by the Engineer.
1.7.1.15 EART H: An excavated material or material to be excavated; all
kinds of material other than rock.
1.7.1.16 ELE VATION: The figures given on the Drawings or in the other
Contract Documents after the word "elevation" or abbreviation of it
shall mean the distance in feet above the datum adopted by the
Engineer.
1.7.1.17 ENG INEER: The person, firm or corporation named as such in
the Contract Documents and duly appointed by the Owner to
undertake the duties and powers herein assigned to the Engineer,
acting either directly or through duly authorized representatives.
1.7.1.18 EQ
UIPMENT: All machinery, together with the necessary
supplies for upkeep and maintenance, and all tools and apparatus
necessary for the proper construction and acceptable completion
of the work.
1.7.1.19 FI ELD ORDER: A written order effecting a change in the work not
involving an adjustment in the contract price or an extension of the
contract time, issued by the Engineer to the Contractor during
construction.
1.7.1.20 FURNI SH: Furnish and install complete, in place, and ready for
use.
1.7.1.21 INFORMATION FOR BIDDERS: The Notice to Contractors
containing all necessary information as to provisions,
requirements, date, place and time of submitting bids.
1.7.1.22 LA TEST EDITION: The current printed documents issued eight
weeks or more prior to date of receipt of bids.
1.7.1.23 MAT ERIALS: Any substance specified for use in the construction
of the project and its appurtenances.
1.7.1.24 NET COST: The cost to the Contractor after application of all
credits and discounts (excepting only cash discounts) and without
the addition of any factor for burden, overhead or indirect cost or
profit.
1.7.1.25 NOT ICE OF AWARD: The written notice of the acceptance of the
bid from the Owner to the successful bidder.
1.7.1.26 NOT ICE TO PROCEED: Written communication issued by the
Owner to the Contractor authorizing him to proceed with the work
and establishing the date for commencement of the work.
1.7.1.27 OP
TIMUM MOISTURE CONTENT FOR COMPACTION: The
moisture content of a soil calculated on the basis of dry weight of
40
soil
at which the soil can be compacted to the approximate
maximum density under a specified standard method of
compaction.
1.7.1.28 OWN ER: A public or quasi-public body or authority, corporation,
association, partnership, or individual for whom the work is to be
performed.
1.7.1.29 PAY MENT BOND: The approved form of security furnished by
the Contractor to guarantee the payment to all persons supplying
labor and materials in the prosecution of the work in accordance
with the terms of the contract.
1.7.1.30 PE
RFORMANCE BOND: The approved form of security
furnished by the Contractor to guarantee the completion of the
work in accordance with the terms of the contract.
1.7.1.31 PRE
CONSTRUCTION CONFERENCE: A conference following
award and prior to start of construction to be attended by a duly
authorized representative of the Engineer and by the responsible
officials of the Contractor and other affected parties.
1.7.1.32 PRO
JECT: The undertaking to be performed as provided in the
Contract Documents.
1.7.1.33 PRO POSAL: The written offer of the bidder, submitted on the
prescribed form, properly signed and guaranteed, to perform the
work at the prices quoted by the bidder.
1.7.1.34 PRO POSAL FORM: The approved form on which the Owner
requires formal bids to be prepared and submitted for the work.
1.7.1.35 PRO POSAL GUARANTY: The security furnished by the bidder
with his proposal for a project, as guaranty he will enter into a
contract for the work if his proposal is accepted.
1.7.1.36 PRO
VIDE: Furnish and install complete, in place, and ready for
use.
1.7.1.37 RES IDENT PROJECT REPRESENTATIVE: The authorized
representative of the Owner or Engineer who is assigned to the
project site or any part thereof.
1.7.1.38 ROCK
: An excavated material or material to be excavated; only
boulders and pieces of concrete or masonry exceeding 1 cu. yd. in
volume, or solid ledge rock which, in the opinion of the Engineer,
requires, for its removal, drilling and blasting, wedging, sledging,
barring, or breaking up with a power operated tool. No soft or
disintegrated rock which can be removed with a hand pick or
power operated excavator or shovel, no loose, shaken, or
previously blasted rock or broken stone in rock fillings or
elsewhere, and no rock exterior to the maximum limits of
measurement allowed, which may fall into the excavation will be
classified as rock.
1.7.1.39 SHO
P DRAWINGS: All drawings, diagrams, illustrations,
brochures, schedules and other data which are prepared by the
Contractor, a subcontractor, manufacturer, supplier or distributor,
which illustrate how specific portions of the work shall be
41
fabri
cated or installed.
1.7.1.40 SPEC IALIST: An individual or firm of established reputation
which is regularly engaged in, and which maintains a regular force
of workmen skilled in either manufacturing or fabricating items
required by the contract, installing items required by the contract,
or otherwise performing work required by the contract. Where the
contract specifications require installation by a specialist, that term
shall also be deemed to mean either the manufacturer of the item,
an individual or firm licensed by the manufacturer, or an individual
or firm who will perform the work under the manufacturer's direct
supervision.
1.7.1.41 SP
ECIFICATIONS: A part of the Contract Documents consisting
of written descriptions of a technical nature of materials,
equipment, construction systems, standards and workmanship.
1.7.1.42 ST
RUCTURES: Bridges, culverts, catch basins, drop inlets,
manholes, retaining walls, cribbing, endwalls, buildings, sewers,
service pipes, underdrains, foundation drains, and other
miscellaneous items which may be encountered in the work, and
which are not otherwise classified herein.
1.7.1.43 SUBBA
SE: The layer or layers of specified or selected material
of designated thickness or rate of application placed on a
subgrade to comprise a component of the pavement structure to
support the base course, pavement or subsequent layer of the
construction.
1.7.1.44 SUBCO NTRACTOR: An individual, firm or corporation having a
direct contract with the Contractor or with any other subcontractor
for the performance of a part of the work at the site. The term
subcontractor is referred to throughout the Contract Documents as
if singular in number and masculine in gender and means a
subcontractor or his authorized representative thereof.
1.7.1.45 SUB-S
UBCONTRACTOR: An individual, firm or corporation
having a direct or indirect contract with a subcontractor to perform
any of the work at the site. The term sub-subcontractor is referred
to throughout the Contract Documents as if singular in number
and masculine in gender and means a sub-subcontractor or an
authorized representative thereof.
1.7.1.46 SUBG
RADE: The top surface of a roadbed upon which the
pavement structure and shoulders are constructed.
1.7.1.47 SUB STANTIAL COMPLETION: That date as certified by the
Engineer when the construction of the project or a specified part
thereof is sufficiently completed, in accordance with the Contract
Documents, so that the project or specified part can be utilized for
the purposes for which it was intended.
1.7.1.48 SPEC IAL PROVISIONS: Conditions of the Contract other than
the General Conditions.
1.7.1.49 SUP ERINTENDENT: The Contractor's authorized representative
in responsible charge of the work.
1.7.1.50 SUP PLIER: Any person or organization who supplies materials or
42
equipm
ent for the work, including that fabricated to a special
design, but who does not perform labor at the site.
1.7.1.51 SUR ETY: The corporation, partnership or individual bound with
and for the Contractor for the full and complete performance of the
contract, and for the payment of all debts pertaining to the work.
1.7.1.52 TI TLES (OR HEADINGS): The titles or headings of the
documents and subsections herein are intended for convenience
of reference and shall not be considered as having any bearing on
their interpretation.
1.7.1.53 WOR
K: All labor necessary to produce the construction required
by the Contract Documents, and all materials and equipment
incorporated or to be incorporated in the project.
1.7.1.54 WRI TTEN NOTICE: Any notice to any party of the Agreement
relative to any part of this Agreement in writing and considered
delivered and the service thereof completed, when posted by
certified or registered mail to the said party at his last given
address, or delivered in person to said party or his authorized
representative on the work.
1.8 ADDITI
ONAL DEFINITIONS:
1.8.1 Wherever in the Specifications or on the Drawings, the words "as
designated," "as detailed," "as directed," "as ordered," "as permitted," "as
prescribed," "as provided," "as requested," "as required," or words of like
import are used, it shall be understood that the designation, detail, direction,
order, permission, prescription, provision, request or requirement of the
Engineer is intended.
1.8.2 Similarly, the words "approved," "acceptable," "satisfactory," and words of
like import shall mean approved by, acceptable to, or satisfactory to the
Owner and/or Engineer.
1.9 ABBREVI
ATIONS:
1.9.1 Where any of the following abbreviations are used in the Specifications, they
shall have the meaning set forth opposite each.
AA Aluminum Association
AAMA Architectural Aluminum Manufacturers Association
AAN American Association of Nurserymen
AAR Association of American Railroads
AASHTO American Association of State Highway and Transportation
Officials
AATC American Association of Textile Chemists and Colorists
ACI American Concrete Institute
ACPA American Concrete Pipe Association
AED American Equipment Dealers
AFBMA Anti-Friction Bearing Manufacturers Association, Inc.
AFI American Filter Institute
AGA American Gas Association
AGC Associated General Contractors of America, Inc.
AGMA American Gear Manufacturers Association
AHAM Association of Home Appliance Manufacturers
AHDGA American Hot Dip Galvanizers Association
AIA American Institute of Architects
43
AIEE
American Institute of Electrical Engineers
AISC American Institute of Steel Construction
AISI American Iron and Steel Institute
ALS American Lumber Standards
AMA Acoustical Materials Association
AMCA Air Moving and Conditioning Association
ANS American Nuclear Society
ANSI American National Standards Institute
APA American Plywood Association
API American Petroleum Institute
ARA American Railway Association
AREA American Railway Engineering Association
ARI Air Conditioning and Refrigeration Institute
ASA Acoustical Society of America
ASCE American Society of Civil Engineers
ASHRAE American Society of Heating, Refrigerating and Air Conditioning
Engineers
ASLA American Society of Landscape Architects
ASLE American Society of Lubricating Engineers
ASME American Society of Mechanical Engineers
ASQC American Society for Quality Control
ASSE American Society of Sanitary Engineers
ASTM American Society for Testing Materials
AVATI Asphalt and Vinyl Asbestos Tile Institute
AWI Architectural Woodwork Institute
AWPA American Wood Preservers' Association
AWPI American Wood Preservers' Institute
AWS American Welding Society
AWWA American Water Works Association
BHMA B uilders Hardware Manufacturers Association
CABRA Copper and Brass Research Association
CDA Copper Development Association
CEMA Conveyor Equipment Manufacturers Association
CGA Compressed Gas Association
CRSI Concrete Reinforcing Steel Institute
CS Commercial Standards, U.S. Department of Commerce
CSI Construction Specification Institute
DCDMA Diamond Core Drill Manufacturers Association
EIA Electronic Industries Association
EPA Environmental Protection Agency
FCI Fluid Controls Institute
FGJA Flat Glass Jobbers Association
FIA Factory Insurance Association
FM Factory Mutual
FMEC Factory Mutual Engineering Corporation
FS Federal Specification
FSPT Federation of Societies for Paint Technology
FSS Federa l Specifications, General Services Administration
FHWA Federal Highway Administration
GA Gypsum Association
IBI Insulation Board Institute
IBR Institute of Boiler and Radiator Manufacturers
IEEE Institute of Electric and Electronics Engineers
IES Illuminating Engineering Society
ILIA Indiana Limestone Institute of America, Inc.
IME Institute of Makers of Explosives
IP Institute of Petroleum (London)
IPC Institute of Printed Circuits
IPCEA Insulated Power Cable Engineers Association
44
ISA
Instrument Society of America
ISO International Organization for Standardization
ITE Institute of Traffic Engineers
LIA Lead Industries Association
MBMA Metal Building Manufacturers Association
MIA Marble Institute of America
MLA Metal Lath Association
MLMA Metal Lath Manufacturers Association
MPTA Mechanical Power Transmission Association
MRIS Maritime Research Information Service
MS Military Specification
MSDS Material Safety Data Sheet
MSTD Military Standard
NAAMM National Association of Architectural Metal Manufacturers
NAFM National Association of Fan Manufacturers
NBFU National Board of Fire Underwriters
NBS National Bureau of Standards
NCCLS National Committee for Clinical Laboratory Standards
NCMA National Concrete Masonry Association
NEC National Electrical Code
NECA National Electrical Contractors Association, Inc.
NEMA National Electrical Manufacturers Association
NFC National Fire Code
NFPA National Fire Protection Association
NHLA National Hardware Lumber Association
NLA National Lime Association
NLGI National Lubricating Grease Institute
NLMA National Lumber Manufacturers Association
NMA National Microfilm Association
NMWIA National Mineral Wool Insulation Association
NPC National Plumbing Code
NRCA National Roofing Contractors Association
NRMCA National Ready Mixed Concrete Association
NSF National Sanitation Foundation
NTMA The National Terrazzo and Mosaic Association
NWMA National Woodwork Manufacturers Association
OSHA Occupational Safety and Health Act
PCA Portland Cement Association
PCI Prestressed Concrete Institute
PDCA Painting and Decorating Council of America
PEI Porcelain Enamel Institute
PI Perlite Institute
RIS Redwood Inspection Service
RMA Rubber Manufacturers Association
RTI Resilient Tile Institute
RWMA Resistance Welder Manufacturers Association
SAE Soci ety of Automotive Engineers
SAMA Scientific Apparatus Makers Association
SBI Steel Boiler Institute
SCDHPT South Carolina Department of Highways and Public
Transportation
SCDOT South Carolina Department of Transportation
SCPI Structural Clay Products Institute
SCSHD South Carolina State Highway Department
SDI Steel Deck Institute
SIS Swedish Standards Association
SJI Steel Joist Institute
SMA Screen Manufacturers Association
SMACNA Sheet Metal and Air Conditioning Contractors National
45
Ass
ociation
SPIB Southern Pine Inspection Bureau
SPR Simplified Practice Recommendation, U. S. Department of
Commerce
SSBC Southern Standard Building Code
SSGC Southern Standard Gas Code
SSPC Steel Structures Painting Council
TAPPI Technical Association of the Pulp and Paper Industry
TCA Tile Council of America
TRB Transportation Research Board
UL Underwriter's Laboratories, Inc.
USDA U.S. Department of Agriculture
WWPA Western Wood Products Association
2. OWNER'S RIGHTS AND RESPONSIBILITIES:
2.1 CHANGES IN THE WORK:
2.1.1 The Owner, without invalidating the contract, may make changes in the work
and in the Drawings and Specifications therefor by making alterations
therein, additions thereto, or omissions therefrom. All work resulting from
such changes shall be performed and furnished under and pursuant to the
terms and conditions of the contract. If such changes result in an increase
or decrease in the work to be done hereunder, or increase or decrease the
quantities thereof, adjustment in compensation shall be made therefor as
provided in Subsection 7.12 entitled PAYMENT FOR EXTRA WORK.
2.1.2 Except in an emergency endangering life or property, no change shall be
made unless in pursuance of a written order from the Engineer authorizing
the change, and no claim for additional compensation shall be valid unless
the change is so ordered.
2.1.3 The Contractor agrees that he shall neither have nor assert any claim for, or
be entitled to, any additional compensation for damages or for loss of
anticipated profits on work that is eliminated.
2.2 PROJECT ENGINEER:
2.2.1 Frazier Engineering, P.A
6592 Bob White Trail
Stanley, NC 28164
Phone: 704-822-8444 Fax: 704-822-8666
2.3 ENGINEER'S AUTHORITY:
2.3.1 The Engineer will be the Owner's representative periodically during the
construction period and he will observe the work in progress on behalf of the
Owner. The Engineer will have the authority to act on behalf of the Owner
in the following matters consistent with the Owner's rights and obligations as
set forth in these Contract Documents:
2.3.1.1 Interpretation of Contract Documents.
2.3.1.2 Approval of samples and shop drawings.
2.3.1.3 Preparation of supplementary details and instructions.
2.3.1.4 Inspection and approval of construction work.
46
2.3.1
.5 Preliminary approval of progress payment applications.
2.3.1.6 Review of television inspection logs and video tapes
2.3.2 Any instructions which the Engineer may issue the Contractor shall be
adjudged an interpretation of the contract requirements and not an act of
supervision. The Engineer has no authority, nor accepts any responsibility,
either direct or implied, to direct and superintend the construction
operations.
2.3.3 The Contractor shall proceed without delay to perform the work as directed,
instructed, determined, or decided by the Engineer and shall comply
promptly with such directions, instructions, determinations, or decisions. If
the Contractor has any objection thereto, he may require that any such
direction, instruction, determination, or decision be put in writing and within
ten (10) days after receipt of any such writing, he may file a written protest
with the Owner stating clearly and in detail his objections, the reasons
therefor, and the nature and amount of additional compensation, if any, to
which he claims he will be entitled thereby. A copy of such protest shall be
filed with the Engineer at the same time as it is filed with the Owner. Unless
the Contractor files such written protest with the Owner and Engineer within
such ten (10) day period, he shall be deemed to have waived all grounds for
protest of such direction, instruction, determination, or decision and all
claims for additional compensation or damages occasioned thereby, and
shall further be deemed to have accepted such direction, instructions,
determination, or decision as being fair, reasonable, and finally
determinative of his obligations and rights under the contract.
2.4 LIABILITY OF THE OWNER:
2.4.1 No person, firm or corporation, other than the Contractor, who signed this
contract as such, shall have any interest herein or right hereunder. No claim
shall be made or be valid either against the Owner or any agent of the
Owner and neither the Owner nor any agent of the Owner shall be liable for
or be held to pay any money, except as herein provided. The acceptance
by the Contractor of the payment as fixed in the final estimate shall operate
as and shall be a full and complete release of the Owner and of every agent
of the Owner of and from any and all claims, demands, damages and
liabilities, by or to the Contractor for anything done or furnished for or arising
out of or relating to or by reason of the work or for or on account of any act
or neglect of the Owner or of any agent of the Owner or of any other person,
arising out of, relating to or by reason of the work, except the claim against
the Owner for the unpaid balance, if any there be, of the amounts retained
as herein provided.
2.5 RIGHTS-OF-WAY
:
2.5.1 All work shall be performed within the existing sewer right-of-way and/or
road-right-of-way as noted on the Drawings. The Contractor shall be
responsible for gaining access to such rights-of-way and accessing sewers
and manholes to perform the work including negotiating with property
Owners, paying all costs for accessing sewers and manholes, and restoring
all areas impacted by the Contractor’s construction operations. The
Contractor shall not be entitled to make or assert claim for damage or a time
extension due to accessing the existing rights-of-way.
2.6 SURVEYS, PERMITS AND REGULATIONS:
47
2.6.1 A
ll surveying shall be the responsibility of the Contractor. The Owner will
furnish bench marks for locating the principle component parts of the work.
2.6.2 Permits and licenses of a temporary nature necessary for the prosecution of
the work shall be secured and paid for by the Contractor unless otherwise
stated in the Special Provisions. Encroachment permits, easements for
permanent structures and permits for permanent changes in existing
facilities shall be secured and paid for by the Owner, unless otherwise
specified. The Contractor shall give all notices and comply with all laws,
ordinances, rules and regulations bearing on the conduct of the work as
drawn and specified. If the Contractor observes that the Contract
Documents are at variance therewith, he shall promptly notify the Engineer
in writing, and any necessary changes shall be adjusted as provided in
Subsection 2.1 entitled CHANGES IN THE WORK.
2.7 LINES, GRADES AND MEASUREMENTS:
2.7.1 The Contractor shall be responsible for setting all base lines and elevations
necessary for performing the work. The Contractor shall employ a
registered civil Engineer, or land surveyor and shall require said Engineer to
establish all lines, elevations, reference marks, batter boards, etc., needed
by the Contractor during the progress of the work, and from time to time to
verify such marks by instrument or other appropriate means.
2.7.2 The Owner's Engineer shall be permitted at all times to check the lines,
elevations, reference marks, batter boards, etc., set by the Contractor, who
shall correct any errors in lines, elevations, reference marks, batter boards,
etc., disclosed by such check. Such check shall not be construed to be an
approval of the Contractor's work and shall not relieve or diminish in any
way the responsibility of the Contractor for the accurate and satisfactory
construction and completion of the entire work.
2.7.3 The Contractor shall make, check and be responsible for all measurements
and dimensions necessary for the proper construction of, and the prevention
of misfittings in, the work.
2.8 OWNER'S RIGHT OF AUDIT:
2.8.1 In case the Owner agrees that a Contractor perform work on a cost plus
basis, the Owner is to have a full and complete right to audit and make
copies of the Contractor's or subcontractor's records with respect to any
payment the Owner may be requested to make, or may make, for any work
done on a cost plus basis.
2.9 OWNER'S RIGHT TO SEPARATE CONTRACTS:
2.9.1 The Owner reserves the right to let other contracts in connection with the
work under similar General Conditions. The Contractor shall afford other
contractors reasonable opportunity for the introduction and storage of their
materials and the execution of their work, and shall properly connect and
coordinate his work with theirs.
2.9.2 The Owner may perform additional work related to the project by himself, or
he may let other contracts containing provisions similar to these. The
Contractor will afford the other contractors who are parties to such contracts
(or the Owner, if he is performing the additional work himself), reasonable
opportunity for the introduction and storage of materials and equipment and
the execution of work and shall properly connect and coordinate his work
48
with
theirs.
2.10 OWNER'S RIGHT TO DO WORK:
2.10.1 If the Contractor should neglect to prosecute the work properly or fail to
perform any provision of this contract, the Owner after three (3) days' written
notice to the Contractor may, without prejudice to any other remedy he may
have, make good such deficiencies and may deduct the cost thereof from
the payment then or thereafter due the Contractor. If such expense shall
exceed the unpaid balance, the Contractor shall pay the difference to the
Owner on demand.
2.10.2 The Engineer's certificate setting forth the fair and reasonable cost of
repairing, replacing, rebuilding or restoring any damaged or defective work
or equipment when performed by one other than the Contractor shall be
binding and conclusive as to the amount thereof upon the Contractor.
2.11 OWNER'S RIGHT TO TERMINATE CONTRACT:
2.11.1 If the Contractor should be adjudged as bankrupt, or if he should make a
general assignment for the benefit of his creditors, or if a receiver or trustee
should be appointed on account of his insolvency, or if he should
persistently or repeatedly refuse or should fail, except in cases for which
extension of time is provided, to supply enough properly skilled workmen or
proper materials, or if he should fail to make prompt payment to
subcontractors or for material or labor, or persistently disregard laws,
ordinances or the instructions of the Owner and his representatives, or
otherwise be guilty of substantial violation of any provision of the contract,
then the Owner, may, without prejudice to any other right or remedy and
after giving the Contractor, and his surety, if any, seven (7) days' written
notice, terminate the employment of the Contractor and take possession of
the premises and of all materials, as it may deem expedient. In such case,
the Contractor shall not be entitled to receive any further payment until the
work is finished. If the unpaid balance of the contract price shall exceed the
expense of finishing the work including compensation for additional
engineering, managerial and administrative services, such excess shall be
paid to the Contractor. If such expense shall exceed such unpaid balance,
the Contractor shall pay the difference to the Owner.
2.12 SUSPENSION OF WORK, TERMINATION AND DELAY:
2.12.1 The Owner may suspend the work or any portion thereof for a period of not
more than ninety (90) days or such further time as agreed upon by the
Contractor, by written notice to the Contractor and the Engineer, which
notice shall fix the date on which work shall be resumed. The Contractor
shall resume that work on the day so fixed. The Contractor will not be
allowed an increase in the contract price but may be due an extension of the
contract time that is directly attributable to any suspension.
2.13 INSPECTIONS AND TESTING:
2.13.1 If the Contract Documents, Owner's instructions, laws, ordinances or any
public authority having jurisdiction require any work to be specially tested or
approved, the Contractor shall give the Owner timely notice of its readiness
for observation by the Owner or inspection by another authority, and if the
inspection is by another authority rather than the Owner, of the date fixed for
such inspection. The required certificates of such inspection shall be
secured by the Contractor. Observations by the Owner shall be promptly
made, and where practicable, at the source of supply. If any work should be
49
cover
ed up without approval or consent of the Owner, it must, if required by
the Owner, be uncovered for examination, at the Contractor's expense.
2.14 INSPECTION OF WORK AWAY FROM THE SITE:
2.14.1 If the work to be done away from the construction site is to be inspected on
behalf of the Owner during its fabrication, manufacture, or testing or before
shipment, the Contractor shall give notice to the Engineer of the place and
time where such fabrication, manufacture, testing, or shipping is to be done.
Such notice shall be in writing and delivered to the Engineer in ample time
so that the necessary arrangements for the inspection can be made.
2.15 PIPE LOCATION:
2.15.1 Exterior pipelines will be located substantially as indicated on the Drawings,
but the right is reserved to the Owner acting through the Engineer, to make
such modifications in location as may be found desirable to avoid
interference with structures or for other reasons. Where fittings, etc., are
noted on the Drawings such notation is for the Contractor's convenience
and does not relieve him from laying and jointing different or additional items
where required.
2.16 PRIOR USE OR OCCUPANCY:
2.16.1 The Owner reserves the right to use or occupy the work or portion thereof,
and to use equipment installed under the contract, prior to final acceptance.
Such use or occupancy will not constitute acceptance of the work or any
part thereof. Despite such use or occupancy, guarantee periods will not
begin until the completion of all work under the contract, unless agreement
to the contrary is made in writing between the parties.
2.17 WEATHER CONDITIONS:
2.17.1 In the event of temporary suspension of work, or during inclement weather,
or whenever the Engineer shall direct, the Contractor will, and will cause his
subcontractors to, protect carefully his and their work and materials against
damage or injury from the weather. If, in the opinion of the Engineer, any
work or materials shall have been damaged or injured by reason of failure
on the part of the Contractor or any of his subcontractors so to protect its
work, such materials shall be removed and replaced at the expense of the
Contractor.
2.18 OWNER'S RIGHT TO CLEAN UP:
2.18.1 If a dispute arises between the separate contractors as to their responsibility
for cleaning up, the Contractor awarded the contract shall be responsible for
the cleanup or the Owner may clean up and charge the cost thereof to the
Contractor as the Engineer shall determine to be just.
3. CONTRACTOR'S RIGHTS AND RESPONSIBILITIES:
3.1 ACCESS TO WORK:
3.1.1 The Owner, the Engineer, and their officers, agents, servants, and
employees plus representatives of the various participating Federal or State
agencies may at any and all times and for any and all purposes, enter upon
the work and site thereof and the premises used by the Contractor, and the
Contractor shall at all times provide safe and proper facilities therefor.
50
3.2 ACCIDENT PREVENTION:
3.2.1 In the performance of the contract the Contractor shall comply with the
applicable provisions of the regulations issued by the Secretary of Labor
pursuant to section 107 of the Contract Work Hours and Safety Standards
Act entitled "Safety and Health Regulations for Construction" (29 CFR Part
1518, renumbered as Part 1926). Occupational Safety and Health
Standards (29 CFR Part 1910) issued by the Secretary of Labor pursuant to
the Williams-Steiger Occupational Safety and Health Act of 1970 are
applicable to work performed by the Contractor subject to the provisions of
the Act.
3.3 STATED ALLOWANCES:
3.3.1 No allowances are included in the Contract Documents.
3.4 ARCHAEO LOGICAL RIGHTS:
3.4.1 There is a possibility that items of archaeological significance may be found
during the excavation of the site. In such event, the Contractor shall stop
excavation in the vicinity of the find and notify the Engineer immediately;
subsequent excavation work shall proceed as directed by the Engineer. All
items found which are considered to have archaeological significance are
the property of the Owner.
3.5 OBLIGATIONS OF CONTRACTOR:
3.5.1 The Contractor shall and will, in good workmanlike manner, do and perform
all work and furnish all supplies and materials, tools, machinery, equipment,
transportation, supervision, temporary construction of any nature, and all
other services, means and facilities except as herein otherwise expressly
specified, necessary or proper to perform and complete all work required by
this contract, within the time herein specified, in accordance with the
provisions of this contract and in accordance with the Drawings and
Specifications and in accordance with the direction of the Engineer as given
from time to time during the progress of the work. He shall furnish, erect,
maintain and remove such construction plants and such temporary works as
may be required.
3.5.2 The Contractor shall observe, comply with, and be subject to all terms,
conditions, requirements, and limitations of the contract and Specifications,
and shall do, carry on, and complete the entire work to the satisfaction of the
Engineer and the Owner.
3.5.3 The Contractor shall check all dimensions, elevations, quantities and
instructions shown on the Drawings or given in the Specifications and shall
notify the Engineer should any discrepancy of any kind be found in the
Drawings, Specifications or conditions at the site. He will not be allowed to
take advantage of any discrepancy, error or omission in the Contract
Documents. If any discrepancy is discovered, the Engineer will issue full
instructions pertaining thereto and the Contractor shall carry out these
instructions as if originally specified.
3.6 CLAIMS FOR ADDITIONAL COST:
3.6.1 If the Contractor wishes to make a claim for an increase in the contract
Sum, he shall give written notice thereof within twenty (20) days after the
occurrence of the event giving rise to such claim. This notice shall be given
by the Contractor before proceeding to execute the work, except in an
51
emergenc
y endangering life or property, in which case the Contractor shall
proceed in accordance with Subsection 3.28 entitled PROTECTION OF
WORK, PROPERTY AND PERSONS IN AN EMERGENCY. No such claim
shall be valid unless so made. If the Owner and the Contractor cannot
agree on the amount of the adjustment in the contract Sum, it shall be
determined by the Engineer. Any change in the contract sum resulting from
such claim shall be authorized by Change Order.
3.7 CLAIMS FOR DAMAGES:
3.7.1 If the Contractor makes claim for any damages alleged to have been
sustained by breach of contract or otherwise, he shall, within ten (10) days
after occurrence of the alleged breach or within ten (10) days after such
damages are alleged to have been sustained, whichever date is the earlier,
file with the Engineer a written, itemized statement in triplicate of the details
of the alleged breach and the details and amount of the alleged damages.
The Contractor agrees that unless such a statement is made and filed as so
required, his claim for damages shall be deemed waived, invalid and
unenforceable, and that he shall not be entitled to any compensation for any
such alleged damages. Within ten (10) days after the timely filing of such
statement, the Engineer shall file with the Owner one copy of the statement
together with his recommendations for action by the Owner.
3.7.2 The Contractor shall not be entitled to claim any additional compensation for
damages by reason of any direction, instruction, determinations or decision
of the Engineer, nor shall any such claims be considered, unless the
Contractor shall have complied in all respects with the last paragraph of
Subsection 2.3 entitled ENGINEER'S AUTHORITY, including, but not
limited to, the filing of a written protest in the manner and within the time
therein provided.
3.8 (NOT USED)
3.9 CLEANING UP:
3.9.1 The Contractor at all times shall keep the site of the work free from rubbish
and debris caused by his operation under the contract. When the work has
been completed, the Contractor shall remove from the site of the work all of
his plant, machinery, tools, construction equipment, temporary work and
surplus materials so as to leave the work and the site clean and ready for
use.
3.9.2 All public streets adjacent to the site and all private ways at the site shall be
kept clean of debris, spilled materials, and wet and dry earth at all times and
shall be cleaned at the end of each working day. When wet earth is
encountered, it shall be cleaned from the vehicles before they leave the site
and enter streets and private ways.
3.10 NON-COM
PLIANCE WITH CONTRACT REQUIREMENTS:
3.10.1 In the event the Contractor, after receiving written notice from the Engineer
of non-compliance with any requirement of this contract, fails to initiate
promptly such action as may be appropriate to comply with the specified
requirement within a reasonable period of time the Owner shall have the
right to order the Contractor to stop any or all work under the contract until
the Contractor has complied or has initiated such action as may be
appropriate to comply within a reasonable period of time. The Contractor
will not be entitled to any extension of contract time or payment for any
costs incurred as a result of being ordered to stop work for such cause.
52
3.11 OVERALL PROJECT COORDINATION:
3.11.1 The Contractor shall coordinate all work of his contract to produce the
required finished project in accordance with the Contract Documents. The
Contractor shall develop the detailed Project Schedule required under
Paragraph 6 to include all required coordination required for completion of
this Contract. Special attention shall be given to the submission of shop
drawings, samples, color charts, and requests for substitution within the
specified time; furnishing the proper shop drawings to subcontractors and
material suppliers, whose work and equipment is affected by and related
thereto; and the furnishing of all information concerning location, type, and
size of built-in equipment and materials and equipment utilities. This
coordination is in addition to all other coordination requirements called for in
the technical documents of the Specifications.
3.12 COMMUNICATIONS:
3.12.1 The Contractor shall forward all communications to the Owner through the
Engineer unless directed otherwise by the Engineer and/or Owner.
3.13 NO DISCRIMINATION IN EMPLOYMENT:
3.13.1 In connection with the performance of work under this contract, the
Contractor agrees not to discriminate against any employee or applicant for
employment because of race, religion, color or national origin. The
aforesaid provision shall include, but not be limited to the following:
employment, upgrading, demotion, or transfer; recruitment or recruitment
advertising; layoff or termination; rates of pay or other forms of
compensation; and selection for training, including apprenticeship.
3.14 AS-BUILT
DRAWINGS:
3.14.1 The Contractor shall designate one set of Drawings for "As-Built Drawings."
The Contractor shall indicate on these drawings all field changes and the
location of each service lateral reconnected, the address and the locations
as actually installed. The "As-Built Drawings" shall be kept current by the
Contractor. The "As-Built Drawings" shall be delivered to the Engineer
within 3 days of Substantial Completion. The Engineer will review the “As-
Built Drawings” for completeness and accuracy and will forward all
deficiencies required for correction to the Contractor within 21 days from
receipt. The Contractor shall correct and address all comments and
deficiencies identified by the Engineer and shall submit the corrected “As-
Built Drawings” prior to submittal of the final Application for Payment. The
Engineer will again review the “As-Built Drawings” for completeness and
accuracy and will forward additional deficiencies and comments to the
Contractor for correction. Final payment shall not be made until the "As-
Built Drawings" are completed, approved by the Engineer and accepted by
the Owner.
3.15 DRAWING
S AND SPECIFICATIONS AT THE SITE:
3.15.1 The Contractor shall maintain at the site one complete set of all Drawings,
Specifications, Addenda, approved Shop Drawings, Change Orders and
other Modifications, in good and readable condition. These shall be
available to the Engineer.
3.16 EMPLOY COMPETENT PERSONS:
53
3.16.1 T
he Contractor shall endeavor to employ only competent persons on the
work. Whenever the Engineer notifies the Contractor in writing that in his
opinion any person on the work is incompetent, unfaithful, disorderly, or
otherwise unsatisfactory, or not employed in accordance with the provisions
of the contract, such person shall be discharged from the work and shall not
again be employed on it, except with the written consent of the Engineer.
3.17 EMPLOY SUFFICIENT LABOR AND EQUIPMENT:
3.17.1 If, in the judgement of the Engineer, the Contractor is not employing
sufficient labor, plant, equipment or other means to complete the work within
the time specified, the Engineer may, after giving written notice, require the
Contractor to employ such additional labor, plant, equipment and other
means as the Engineer may deem necessary to enable the work to progress
properly.
3.18 EXISTING STRUCTURES:
3.18.1 Where the dimensions and locations of existing structures are of importance
in the installation or connection of any part of the work, the Contractor shall
verify such dimensions and locations in the field before the fabrication of any
material or equipment which is dependent on the correctness of such
information.
3.19 INDE
MNIFICATION:
3.19.1 The Contractor will indemnify and hold harmless the Owner and the
Engineer and their agents and employees from and against all claims,
damages, losses and expenses, including attorneys' fees, arising out of or
resulting from the performance of the work, provided that any such claim,
damage, loss or expense is attributable to bodily injury, sickness, disease or
death, or to injury to or destruction of tangible property including the loss of
use resulting therefrom; and is caused in whole or in part by any negligent
or willful act or omission of the Contractor, any subcontractor, anyone
directly or indirectly employed by any of them, or anyone for whose acts any
of them may be liable.
3.19.2 In any and all claims against the Owner and the Engineer, or any of their
agents or employees, by any employee of the Contractor, any
subcontractor, anyone directly or indirectly employed by any of them, or
anyone for whose acts any of them may be liable, the indemnification
obligation shall not be limited in any way by any limitation on the amount or
type of damages, compensation or benefits payable by or for the Contractor
or any subcontractor under workmen's compensation acts, disability benefit
acts or other employee benefits acts.
3.20 DRUG FRE
E ENVIRONMENT:
3.20.1 The Contractor shall not sell and shall neither permit nor suffer the
introduction or use of intoxicating liquors upon or about the work.
3.21 LEGAL ADDRESS OF CONTRACTOR:
3.21.1 The Contractor's business address and his office at or near the site of the
work are both hereby designated as places to which communications may
be delivered. The depositing of any letter, notice, or other communication in
a postpaid wrapper directed to the Contractor's business address in a post
office box regularly maintained by the U. S. Postal Service or the delivery at
either designated address of any letter, notice, or other communication by
54
mail or
otherwise shall be deemed sufficient service thereof upon the
Contractor, and the date of such service shall be the date of receipt. The
first-named address may be changed at any time by an instrument in
writing, executed and acknowledged by the Contractor and delivered to the
Engineer. Service of any notice, letter or other communication upon the
Contractor personally shall likewise be deemed sufficient service.
3.22 MUTUAL RESPONSIBILITY OF CONTRACTORS:
3.22.1 The Contractor shall afford other contractors responsible opportunity for the
introduction and storage of their materials and equipment and the execution
of their work, and shall properly connect and coordinate his work with theirs.
3.22.2 If any part of the Contractor's work depends for proper execution or results
upon the work of any other separate contractor, the Contractor shall inspect
and promptly report to the Owner any apparent discrepancies or defects in
such work that render it unsuitable for such proper execution and results.
Failure of the Contractor so to inspect and report shall constitute an
acceptance of the other contractor's work as fit and proper to receive his
work, except as to defects which may develop in the other separate
contractor's work after the execution of the Contractor's work. To ensure
proper execution of the subsequent work, the Contractor shall measure
work already in place and shall at once report to the Owner any discrepancy
between the executed work and the Contract Documents.
3.22.3 Should the Contractor cause damage to any separate contractor on the
work, the Contractor agrees, upon due notice to settle with such contractor
by agreement or arbitration, if he will so settle. If such separate contractor
sues the Owner on account of any damage alleged to have been so
sustained, the Owner shall notify the Contractor, who shall defend such
proceedings at the Contractor's expense, and if any judgement against the
Owner arises therefrom, the Contractor shall pay or satisfy it and pay all
costs incurred by the Owner.
3.23 NIGHT AND WEEKEND WORK:
3.23.1 No work shall be done at night or on weekends except:
3.23.1.1 Usual protective work, such as pumping and the tending of lights;
3.23.1.2 Work done in case of emergency threatening injury to persons or
property;
3.23.1.3 When provided for under Special Provisions as herein specified;
3.23.1.4 If all of the conditions set forth in the next paragraph below are
met.
3.23.2 No work other than that included in (3.23.1.1), (3.23.1.2). and (3.23.1.3)
above, shall be done at night except when:
3.23.2.1 In the judgement of the Engineer, the work will be of advantage to
the Owner and can be performed satisfactorily at night;
3.23.2.2 The work will be done by a crew organized for regular and
continuous night work;
3.23.2.3 The Engineer has given written permission for such night work.
55
3.23.3 A
ny work necessary to be performed after regular hours, on weekends, or
Legal Holidays, shall be performed without additional expense to the Owner.
3.24 OCCUPYING PRIVATE LAND:
3.24.1 The Contractor shall not (except after written consent from the property
parties) enter or occupy with men, tools, materials, or equipment, any land
outside the rights-of-way or property of the Owner. A copy of the written
consent shall be given to the Engineer prior to occupation of private land.
3.25 PERMITS AND RESPONSIBILITIES:
3.25.1 The Contractor shall, without additional expense to the Owner, be
responsible for obtaining any necessary licenses and permits, and for
complying with any applicable Federal, State and municipal laws, codes,
and regulations, in connection with the prosecution of the work. He shall be
similarly responsible for all damages to persons or property that occur as a
result of his fault or negligence. He shall also be responsible for all
materials delivered and work performed until completion and acceptance of
the entire construction work, except for any completed unit of construction
thereof which theretofore may have been accepted.
3.26 PRECAUTIONS DURING ADVERSE WEATHER:
3.26.1 During adverse weather and against the possibility thereof, the Contractor
shall take all necessary precautions so that the work may be properly done
and satisfactory in all respects. When required, protection shall be provided
by use of tarpaulins, wood shelters, or other approved means.
3.26.2 During cold weather, materials shall be preheated, if required, and the
materials and adjacent structure into which they are to be incorporated shall
be made and kept sufficiently warm so that a proper bond will take place
and a proper curing, aging, or drying will result. Protected spaces shall be
artificially heated by approved means which will result in a moist or dry
atmosphere according to the particular requirements of the work being
protected. Ingredients for concrete and mortar shall be sufficiently heated
so that the mixture will be warm throughout when used.
3.26.3 The Engineer may suspend construction operations at any time when, in his
judgement, the conditions are unsuitable or the proper precautions are not
being taken, whatever the weather may be, in any season. The Contractor
agrees that he shall not have or assert any claim for or be entitled to any
additional compensation or damages on account of any such suspension.
3.27 PROTECTION OF WORK, PROPERTY AND PERSONS:
3.27.1 The Contractor will be responsible for initiating, maintaining and supervising
all safety precautions and programs in connection with the work. He will
take all necessary precautions for the safety of, and will provide the
necessary protection to prevent damage, injury or loss to all employees on
the work and other persons who may be affected thereby, all the work and
all materials or equipment to be incorporated therein, whether in storage on
or off the site, and other property at the site or adjacent thereto, including
trees, shrubs, lawns, walks, pavements, roadways, structures and utilities
not designated for removal, relocation or replacement in the course of
construction.
3.27.2 The Contractor will comply with all applicable laws, ordinances, rules,
regulations and orders of any public body having jurisdiction. He will erect
56
and maint
ain as required by the conditions and progress of the work, all
necessary safeguards for safety and protection. He will notify Owners of
adjacent utilities when prosecution of the work may affect them. The
Contractor will remedy all damage, injury or loss to any property caused,
directly or indirectly, in whole or in part, by the Contractor, any subcontractor
or anyone directly or indirectly employed by any of them or anyone for
whose acts any of them may be liable, except damage or loss attributable to
the fault of the Contract Documents or to the acts or omissions of the Owner
or the Engineer or anyone employed by either of them or anyone for whose
acts either of them may be liable and not attributable, directly or indirectly, in
whole or in part, to the fault or negligence of the Contractor.
3.28 PROTECTION OF WORK, PROPERTY AND PERSONS IN AN EMERGENCY:
3.28.1 In emergencies affecting the safety of persons or the work or property at the
site or adjacent thereto, the Contractor, without special instruction or
authorization from the Engineer or Owner, shall act to prevent threatened
damage, injury or loss. He will give the Engineer prompt Written Notice of
any significant changes in the work or deviations from the Contract
Documents caused thereby, and a Change Order shall thereupon be issued
covering the changes and deviations involved.
3.29 PROTECTION AGAINST WATER AND STORM:
3.29.1 The Contractor shall take all precautions necessary to prevent damage to
the work by storms or by water entering the site of the work directly or
through the ground. In case of damage by storm or water, the Contractor
shall at his own cost and expense make such repairs or replacements or
rebuild such parts of the work as the Engineer may require in order that the
finished work may be completed as required by the contract.
3.30 PROTECTION OF EXISTING VEGETATION, STRUCTURES, UTILITIES AND
IMPROVEMENTS:
3.30.1 The Contractor will preserve and protect all existing vegetation such as
trees, shrubs and grass on or adjacent to the site of the work which is not to
be removed and which does not reasonably interfere with the construction
work. Care shall be taken in removing trees authorized for removal to avoid
damage to vegetation to remain in place. Any limbs or branches of trees
broken during such operations or by the careless operation of equipment or
by workmen, shall be trimmed with a clean cut and painted with an
approved tree pruning compound as approved by the Engineer.
3.30.2 The Contractor will protect from damage all existing improvements or
utilities at or near the site of the work, the location of which is made known
to him, and will repair or restore any damage to such facilities resulting from
failure to comply with the requirements of this contract or the failure to
exercise reasonable care in the performance of the work. If the Contractor
fails or refuses to repair any such damage promptly, the Owner may have
the necessary work performed and charge the cost thereof to the
Contractor.
3.30.3 The Contractor shall protect trees adjacent to his work and not to be cut,
with substantial barriers of such height as may be necessary to protect the
trees from injury from piled material, from equipment, from his operation, or
otherwise due to his work. Excavating machinery and cranes shall be of
suitable type and shall be operated with care to prevent injury to trees not to
be cut and particularly to overhanging branches and limbs.
57
3.30.4 O
n paved surfaces, the Contractor shall not use or operate tractors,
bulldozers or other power operated equipment, tire treads or wheels of
which are so shaped as to cut or otherwise injure such surfaces.
3.31 RESTORATION OF PROPERTY:
3.31.1 All existing surfaces, including lawns, grassed and planted areas which
have been injured by the Contractor's operations shall be restored to a
condition at least equal to that in which they were found immediately before
work was begun. Suitable materials and methods shall be used for such
restoration. All restored plantings shall be maintained by cutting, trimming,
fertilizing, etc., until acceptance. The restoration of existing property or
structures shall be done as promptly as practicable and not be left until the
end of the construction period.
3.32 INTERFERENCE WITH AND PROTECTION OF STREETS:
3.32.1 The Contractor shall not close or obstruct any portion of a street, road, or
private way without obtaining permits therefor from the proper authorities. If
any street, road or private way shall be rendered unsafe by the Contractor's
operations, he shall make such repairs or provide such temporary ways or
guards as shall be acceptable to the proper authorities.
3.32.2 Streets, roads, private ways and walks not closed shall be maintained
passable and safe by the Contractor, who shall assume and have full
responsibility for the adequacy and safety of provisions made therefor.
3.32.3 The Contractor shall, at least twenty-four (24) hours in advance, notify the
highway, police and fire departments in writing, with a copy to the Engineer,
if the closure of a street or road is necessary. The Contractor shall also
place an advertisement in The Index Journal at least one day prior to the
closing to provide details of the closing to the public, including the
appropriate detour routes. The Contractor shall cooperate with the police
department in the establishment of alternate routes and shall provide
adequate detour signs, plainly marked and well lighted, in order to minimize
confusion.
3.33 TRAFFIC CONTROL:
3.33.1 Where control of traffic is required for public safety, the Contractor shall
provide an adequate number of flagmen employed at his own expense.
3.34 CONSTRUCTION DRAINAGE:
3.34.1 The Contractor shall furnish all labor, materials and necessary equipment
for the temporary control of surface water and seepage water during
construction and keep all excavations, pits and trenches free from water at
all times.
3.34.2 The Contractor shall furnish and operate pumps and other equipment
required. Dikes and ditches shall be constructed around excavations and
elsewhere as necessary to prevent surface water from flooding the
excavations or standing in areas adjacent to excavations, in work areas or in
material storage areas. The Contractor shall take all necessary precautions
to protect adjacent areas and properties from damage. He shall not divert
water onto adjacent areas and properties at points other than that which
would be considered the natural flow, prior to construction, without the
expressed consent of the Owner in writing with a copy to the Engineer. He
shall take steps to prevent the erosion of soil, earth and other material and
58
the con
duction of the eroded materials onto adjacent properties and shall be
responsible for the removal of such materials and the restoration of adjacent
areas to their original condition.
3.35 RETURN OF DRAWINGS:
3.35.1 All copies of Drawings, Specifications and other Documents furnished by the
Owner or the Engineer to the Contractor may be used only in connection
with the prosecution of the work and shall be returned by the Contractor
upon completion of the work.
3.36 SITE INVESTIGATION:
3.36.1 The Contractor acknowledges that he has investigated and satisfied himself
as to the conditions affecting the work, including but not restricted to those
bearing upon transportation, disposal, handling and storage of materials,
availability of labor, water, electric power, roads and uncertainties of
weather, river stages, tides or similar physical conditions at the site, the
confirmation and conditions of the ground, the character of equipment and
facilities needed preliminary to and during the prosecution of the work. The
Contractor further acknowledges that he has satisfied himself as to the
character, quality and quantity of surface and subsurface materials or
obstacles to be encountered insofar as this information is reasonably
ascertainable from an inspection of the site, including all exploratory work
done by the Owner, as well as from information presented by the Drawings
and Specifications made a part of the contract. Any failure by the
Contractor to acquaint himself with the available information will not relieve
him from responsibility for estimating properly the difficulty or cost of
successfully performing the work. The Owner assumes no responsibility for
any conclusions or interpretations made by the Contractor on the basis of
the information made available by the Owner.
3.37 SOIL EROSION AND SEDIMENT CONTROL:
3.37.1 The Contractor's attention is directed to the fact that unless exposed earth
areas are properly cared for during construction, they may result in
substantial sedimentation damage downstream from the construction area.
The Contractor shall be responsible for conducting his site grading and
drainage operations in such manner as to prevent excessive soil erosion of
the construction site work areas. He shall at all times provide satisfactory
means to prevent the movement and washing of soil onto pavements or into
adjacent ditches, swales, inlets and drainage pipes, to avoid the possibility
of these structures becoming clogged with soil. He shall promptly repair all
areas which may become eroded and shall clear drainage ditches, swales
and structures of siltation.
3.38 SUBSURFACE CONDITIONS:
3.38.1 The Contractor shall promptly, and before such conditions are disturbed,
except in the event of an emergency, notify the Owner by Written Notice of:
3.38.1.1 Subsurface or latent physical conditions of the site differing
materially from those indicated in the Contract Documents.
3.38.1.2 Unknown physical conditions at the site, of an unusual nature,
differing materially from those ordinarily encountered and
generally recognized as inherent in work of the character provided
for in the Contract Documents.
59
3.38.2 T
he Owner shall promptly investigate the conditions, and if he finds that
such conditions do so materially differ and cause an increase or decrease in
the cost of, or in the time required for, performance of the work, an equitable
adjustment shall be made and the Contract Documents shall be modified by
a Change Order. Any claim of the Contractor for adjustment hereunder
shall not be allowed unless he has given the required Written Notice;
provided that the Owner may, if he determines the facts so justify, consider
and adjust any such claims asserted before the date of the final payment.
3.39 SUBCONTRACTING:
3.39.1 The Contractor may utilize the services of specialty subcontractors on those
parts of the work which, under normal contracting practices, are performed
by specialty subcontractors. The Contractor shall, without additional
expense to the Owner, utilize the services of specialty subcontractors on
those parts of the work which are specified to be performed by specialty
subcontractors.
3.39.2 The Contractor shall not award any work to any subcontractor without prior
written approval of the Owner, which approval will not be given until the
Contractor submits to the Owner a written statement concerning the
proposed award to the subcontractor, which statement shall contain such
information as the Owner may require. No request for payment will be
approved before this list has been received and reviewed by the Owner.
The Owner reserves the right to reject subcontractors based on their
experience and past experience for the Owner.
3.39.3 The Contractor shall not award work to subcontractor(s), in excess of fifty
percent (50%) of the contract price, without prior written approval of the
Owner.
3.39.4 The Contractor shall be fully responsible to the Owner for the acts and
omissions of his subcontractors, and of persons either directly or indirectly
employed by them, as he is for the acts and omissions of persons directly
employed by him.
3.39.5 The Contractor shall cause appropriate provisions to be inserted in all
subcontracts relative to the work to bind subcontractors to the Contractor by
the terms of the Contract Documents insofar as applicable to the work of
subcontractors and to give the Contractor the same power as regards
terminating any subcontract that the Owner may exercise over the
Contractor under any provisions of the Contract Documents.
3.39.6 If any other contractor or any subcontractor of any such other contractor
shall suffer or claim to have suffered loss, damage or delay by reason of the
acts or omissions of the Contractor or of any of his subcontractors, the
Contractor agrees to assume the defense against any such claim and to
reimburse such other contractor or subcontractor for such loss or damage.
The Contractor agrees to and does hereby indemnify and save harmless the
Owner from and against any and all claims by such other contractors or
subcontractors alleging such loss, damage or delay and from and against
any and all claims, demands, costs and expenses, including attorneys' fees,
arising out of, relating to or resulting from such claims,
3.39.7 The Contractor shall be responsible for the coordination of the trades,
subcontractors and material men engaged upon his work. The Owner or
Engineer will not undertake to settle any differences between the Contractor
and his subcontractors or between subcontractors. If any subcontractor on
the project, in the opinion of the Owner, proves to be incompetent or
60
otherw
ise unsatisfactory, he shall be replaced if and when directed in writing
by the Engineer.
3.39.8 Nothing contained in this contract shall create any contractual relation
between any subcontractor and the Owner.
3.40 SUPERVISION:
3.40.1 The Contractor shall keep on his work, during its progress, a competent
superintendent and any necessary assistants, all satisfactory to the Owner.
The superintendent shall not be changed except with the consent of the
Owner, unless the superintendent proves to be unsatisfactory to the
Contractor and ceases to be in his employ. The superintendent shall
represent the Contractor in his absence and all directions given to him shall
be as binding as if given to the Contractor. Important directions shall be
confirmed in writing to the Contractor. Other directions shall be so
confirmed on written request in each case. The Owner shall not be
responsible for the acts or omissions of the superintendent or his assistants.
3.40.2 The Contractor shall give efficient supervision to the work, using his best
skill and attention. He shall carefully study and compare all Drawings,
Specifications and other instructions and shall at once report to the Owner
any error, inconsistency or omission which he may discover.
3.41 TAXES:
3.41.1 The Contractor shall promptly pay all Federal, State and local taxes which
may be assessed against him in connection with the work or his operations
under the Agreement and/or the other Contract Documents, including, but
not limited to, taxes attributable to the purchase of materials and equipment,
to the performance of services and the employment of persons in the
prosecution of the work.
3.42 TEMPORARY HEAT:
3.42.1 The Contractor shall provide temporary heat whenever necessary to protect
all work and materials against injury from dampness and cold and to dry out
moisture from the building. Fuel, equipment and method of heating shall be
satisfactory to the Owner's Insurer and the Engineer.
3.42.2 Temporary heating apparatus shall be installed and operated in such a
manner that finished work will not be damaged thereby.
3.43 SANITARY FACILITIES:
3.43.1 The Contractor shall provide adequate sanitary facilities for the use of those
employed on the work. Such facilities shall be made available when the first
employees arrive on the site of the work, shall be properly secluded from
public observation, and shall be constructed and maintained during the
progress of the work in suitable numbers and at such points and in such a
manner as may be required or approved. The Contractor shall maintain the
sanitary facilities in a satisfactory and sanitary condition at all times and
shall enforce their use. He shall rigorously prohibit the committing of
nuisances on the site of the work, on lands of the Owner or on adjacent
property. The Owner and the Engineer shall have the right to inspect such
facilities at all times to determine whether or not they are being properly and
adequately maintained.
3.44 TEMPORARY UTILITIES:
61
3.44.1 T
he Contractor shall make arrangements for and furnish as a part of the
contract, all electricity, water, lighting and other utilities needed to do the
work called for by the contract. Any separate contractors having a contract
with the Owner shall make arrangements for and share the cost with the
Contractor for the use of the required utilities on a pro rata schedule based
on an agreed basis. All electrical work shall comply with the National
Electric Code.
3.44.2 The Contractor shall provide and pay for all temporary wiring, switches,
connections and meters. The Contractor shall provide sufficient electric
lighting so that all work may be done in a workmanlike manner when there is
not sufficient daylight.
3.45 UNCOVE
RING AND CORRECTION OF WORK:
3.45.1 The Engineer shall be furnished by the Contractor with every reasonable
facility for examining and inspecting the work and for ascertaining that the
work is being performed in accordance with the requirements and intent of
the contract, even to the extent of requiring the uncovering or taking down of
portions of finished work by the Contractor.
3.45.2 Should the work thus uncovered or taken down prove satisfactory, the cost
of uncovering or taking down and the replacement thereof shall be
considered as extra work unless the original work was done in violation of
the contract in point of time or in absence of the Engineer or his inspector
and without his written authorization, in which case said cost shall be borne
by the Contractor. Should the work uncovered or taken down prove
unsatisfactory, said cost shall likewise be borne by the Contractor.
3.45.3 The inspection of the work shall not relieve the Contractor of any of his
obligations to perform and complete the work as required by the contract.
Defective work shall be corrected and unsuitable materials, equipment,
apparatus and other items shall be replaced by the Contractor,
notwithstanding that such work, materials, equipment, apparatus and other
items may have been previously overlooked or accepted or estimated for
payment. If the work or any part thereof shall be found defective at any time
before the final acceptance of the work, the Contractor shall forthwith make
good such defect in a manner satisfactory to the Engineer; if any materials,
equipment, apparatus or other items brought upon the site for use or
incorporation in the work, or selected for the same, are condemned by the
Engineer as unsuitable or not in conformity with the Specifications or any of
the other Contract Documents, the Contractor shall forthwith remove such
materials, equipment, apparatus and other items from the site of the work
and shall at his own cost and expense make good and replace the same
and any material furnished by the Owner which shall be damaged or
rendered defective by the handling or improper installation by the
Contractor, his agents, servants, employees or subcontractors.
3.45.4 If the Owner deems it inexpedient to correct work not in accordance with the
contract, an equitable deduction from the contract price shall be made
therefor.
3.46 COOPERATION WITH UTILITIES:
3.46.1 The Owner will notify all utility companies, all pipe line Owners or other
parties affected, and endeavor to have all necessary adjustments of the
public or private utility fixtures, pipe lines and other appurtenances within or
adjacent to the limits of construction, made as soon as practicable.
62
3.46.2 W
ater lines, gas lines, wire lines, sewer lines, water and gas meter boxes,
water and gas valve boxes, manholes, light standards, cableways, signals
and all other utility appurtenances within the limits of the proposed
construction which are to be relocated or adjusted are to be moved by the
Owner under separate agreement, except as otherwise provided for in the
Special Provisions or as noted on the Drawings.
3.46.3 The Drawings will show all known utilities located within the limits of the
contract according to information obtained. The accuracy of the Drawings in
this respect is not guaranteed by the Owner. The Contractor shall have
considered in his bid all of the permanent and temporary utility
appurtenances in their present or relocated position. No additional
compensation will be allowed for any delays, inconveniences or damages
sustained by him due to any interference from the said utility appurtenances
or the operation of moving them.
3.46.4 Unless otherwise provided, the cost of temporary rearrangement of utilities
made only in order to facilitate the construction of the work will be borne by
the Contractor.
3.47 VERIFICATION OF DIMENSIONS AND ELEVATIONS:
3.47.1 Dimensions and elevations indicated on the Drawings in reference to
existing structures, location of utilities, sewer inverts or other information on
existing facilities, are the best available data obtainable but are not
guaranteed by the Engineer. The Engineer will not be responsible for their
accuracy. Before proceeding with any work dependent upon the data
involved, the Contractor shall field check and verify all dimensions, grades,
inverts, lines, elevations or other conditions of limitations at the site of the
work to avoid construction errors or damage to existing facilities. If any work
is performed by the Contractor, or any subcontractors, prior to adequate
verification of applicable data, any resultant extra cost for adjustment of
work necessary to conform to existing conditions, or damage to existing
facilities, shall be assumed by the Contractor without reimbursement or
compensation by the Owner.
3.47.2 If the Contractor, in the course of the work, finds any discrepancy between
the Drawings and the physical conditions of the locality, or any errors or
omissions in Drawings or in the layout as given by survey points and
instructions, he shall immediately inform the Engineer in writing. The
Engineer will promptly investigate the reported conditions and issue such
instructions as may be necessary for the proper execution of the work. Any
work done after such discovery and prior to receipt of such instructions shall
be at the risk of the Contractor.
4. MATERIALS, EQUIPMENT AND WORKMANSHIP:
4.1 CHEMI CAL USAGE:
4.1.1 All chemicals used during project construction or furnished for project
operation, whether herbicide, pesticide, disinfectant, polymer, reactant or of
other classification, shall show approval of either EPA or U.S.D.A. The use
of all such chemicals and disposal of residues shall be in strict conformance
with manufacturer and U.S.D.A. instructions. The Contractor shall provide a
MSDS for all chemicals or products used during the project prior to the use
of such material.
4.2 CONTRACTOR'S TITLE TO MATERIALS:
63
4.2.1 N
o materials or supplies for the work shall be purchased by the Contractor
or by any subcontractor subject to any chattel mortgage or under a
conditional sale contract or other agreement by which an interest is retained
by the seller. The Contractor warrants that he has good title to all materials
and supplies used by him, in the work, free from all liens, claims or
encumbrances.
4.3 CORRECTION OF WORK BEFORE COMPLETION:
4.3.1 The Contractor shall promptly remove from the premises all work
condemned by the Owner as failing to conform to the Contract Documents,
whether incorporated or not and the Contractor shall promptly replace and
re-execute his own work in accordance with the contract and without
expense to the Owner and shall bear the expense of making good all work
of other contractors destroyed or damaged by such removal or replacement.
The fact that the Engineer may have previously overlooked such defective
work shall not constitute an acceptance of any part of it.
4.3.2 If the Contractor does not remove such condemned work within a
reasonable time, fixed by written notice, the Owner may remove it, and after
storing it at the job site for thirty (30) days, due written notice thereof being
given the Contractor, the Owner may offer the material for sale and removal
from the premises. Net proceeds from such sale shall be for the
Contractor's credit against the "Owner's Right to Do Work." If the material
has no sale value, the Owner may remove it from the premises and/or
otherwise dispose of it. The costs of such disposition shall be deducted
from payments to the Contractor as provided in Subsection 2.10 entitled
OWNER'S RIGHT TO DO WORK.
4.4 CORRECTION OF WORK AFTER COMPLETION:
4.4.1 The Contractor shall remedy any defects due to faulty materials or
workmanship and pay for any damage to other work resulting therefrom
which shall appear within a period of one (1) year from the date of final
acceptance of the work except where longer periods are specified and in
accordance with the terms of any special guarantees provided in the
contract. The Owner will give notice of observed defects with reasonable
promptness.
4.5 CORRECTIONS OF WORK AFTER GUARANTEE PERIOD:
4.5.1 It shall be the responsibility of the Contractor to permanently correct all
defective items called to his attention within the guarantee period, whether
such correction be made within the guarantee period or not. The contract
shall not be fully performed until such permanent corrections are made.
4.6 GENERAL GUARANTY:
4.6.1 The Contractor warrants to the Owner that all materials and equipment
furnished under this contract will be new unless otherwise specified, and
that all work will be of good quality, free from faults and defects and in
conformance with the Contract Documents. All work not so conforming to
these standards may be considered defective. If required by the Owner, the
Contractor shall furnish satisfactory evidence as to the kind and quality of
materials and equipment.
4.6.2 Neither the final certificate of payment nor any provision in the Contract
Documents nor partial or entire occupancy of the premises by the Owner
64
shall
constitute an acceptance of work not done in accordance with the
Contract Documents or relieve the Contractor of liability in respect to any
express warranties or responsibility for faulty materials or workmanship.
The Contractor shall remedy any defects in the work and pay for any
damage to other work resulting therefrom, which shall appear within a
period of one (1) year from the date of final acceptance of the work, except
where longer periods are specified. The Owner will give notice of observed
defects with reasonable promptness. If the Contractor shall fail to repair,
replace, rebuild or restore such defective or damaged work or equipment
promptly after receiving notice, the Owner shall have the right to have the
work done by others in the same manner as is provided for in Subsection
2.10, OWNERS RIGHT TO DO WORK.
4.6.3 The Contractor shall further guarantee for a period of one (1) year that any
building or buildings, constructed under this project, shall be watertight and
leakproof at every point and in every area, except where leaks can be
attributed to damage to the building by external forces other than storm or
foundation settlement. He shall, immediately upon notification by the Owner
of water penetration, determine the source of water penetration and, at his
own expense, do any work necessary to make the building watertight. He
shall also, at his own expense, repair or replace any other damaged
material to return the building or buildings to the original accepted condition.
4.6.4 In addition to the foregoing stipulations, the Contractor shall comply with all
other guarantees and warranties referred to in any portions of the Contract
Documents, the more stringent requirement governing. Unless otherwise
specifically stated elsewhere in these Specifications, the date of beginning
of all guarantee or warranty periods shall be the date of acceptance of the
project.
4.6.5 If for any reason, the Contractor cannot guarantee any part of his work using
material or construction methods which have been specified, or shown, he
shall notify the Engineer in writing before contracts are signed, giving
reasons together with the name of product and data on substitutions he can
guarantee. Should the Contractor fail to so notify the Engineer prior to the
signing of contracts, he will be held to have agreed to guarantee all work
specified or shown.
4.7 HANDLING
AND DISTRIBUTION:
4.7.1 The Contractor shall handle, haul and distribute all materials and all surplus
materials on the different portions of the work as necessary or required;
shall provide suitable and adequate storage room for materials and
equipment during the progress of the work, and be responsible for the
protection, loss of or damage to materials and equipment furnished by him,
until the final completion and acceptance of the work.
4.7.2 Storage and demurrage charges by transportation companies and vendors
shall be borne by the Contractor.
4.8 MANUFACTURER'S DIRECTIONS:
4.8.1 All manufactured articles, material and equipment shall be applied, installed,
connected, erected, used, cleaned and conditioned as directed by the
manufacturers, unless herein specified to the contrary.
4.9 MATERIALS, SERVICES AND FACILITIES:
4.9.1 It is understood that, except as otherwise specifically stated in the Contract
65
Docume
nts, the Contractor shall provide and pay for all labor, supplies and
materials, tools, machinery, equipment, transportation, supervision,
temporary construction of any nature and all other services, means and
facilities of any nature whatsoever necessary to execute, complete and
deliver the work within the specified time.
4.9.2 Materials and equipment shall be so stored as to insure the preservation of
their quality and fitness for the work. Stored materials and equipment to be
incorporated in the work shall be located so as to facilitate prompt
inspection.
4.9.3 Materials, supplies and equipment shall be in accordance with samples
submitted by the Contractor and approved by the Engineer.
4.10 MISCELLANEOUS ITEMS:
4.10.1 The work to be done by the Contractor, specified and enumerated under this
contract, shall include any minor details of the work not specifically
mentioned in the Specifications or shown on the Drawings, but obviously
necessary for the proper completion of the work, which shall be considered
incidental and as being a part of and included with the work for which prices
are given in the bid. The Contractor will not be entitled to any additional
compensation therefor.
4.10.2 Miscellaneous items and accessories which are not specifically mentioned,
but which are essential to produce a complete and properly operating
installation or usable structure or plant, providing the indicated function,
shall be furnished and installed without change in the contract price. Such
miscellaneous items and accessories shall be of the same quality
standards, including material, style, finish, strength, class, weight and other
applicable characteristics as specified for the major component of which the
miscellaneous item or accessory is an essential part, and shall be approved
by the Engineer before installation. The above requirement is not intended
to include major components not covered by or inferable from the Drawings
and Specifications.
4.11 MISTAKES OF CONTRACTOR:
4.11.1 The Contractor shall promptly correct and make good any and all defects,
damages, omissions or mistakes, for which he and/or his agents, servants,
employees or subcontractors are responsible, and he shall pay to the Owner
all costs, expenses, losses and damages resulting therefrom or by reason
thereof as determined by the Engineer.
4.12 PROTECTION AGAINST ELECTROLYSIS:
4.12.1 Where dissimilar metals are used in conjunction with each other, or against
concrete surfaces, suitable insulation shall be provided between adjoining
surfaces so as to eliminate direct contact and any resultant electrolysis. The
insulation shall be bituminous impregnated felt, heavy bituminous coatings,
nonmetallic separators or washers, or other approved materials.
4.13 RIGHT TO MATERIALS:
4.13.1 Nothing in the contract shall be construed as vesting in the Contractor any
right of property in the materials, equipment, apparatus and other items
furnished after they have been installed or incorporated in or attached or
affixed to the work or the site, but all such materials, equipment, apparatus
and other items shall, upon being so installed, incorporated, attached or
66
affi
xed, become the property of the Owner.
4.14 ROYALTIES AND PATENTS:
4.14.1 The Contractor shall pay all applicable royalties and license fees. He shall
defend all suits or claims for infringement of any patent rights and shall save
the Owner harmless from loss on account thereof, except that the Owner
shall be responsible for all such loss when a particular process or the
product of a particular manufacturer or manufacturers is specified, but if the
Contractor has information that the process or article specified is an
infringement of a patent, he shall be responsible for such loss unless he
promptly gives such information to the Owner in writing.
4.15 SUBMITTAL SCHEDULE:
4.15.1 Within twenty (20) days after execution and delivery of the contract, the
Contractor shall prepare and deliver to the Engineer a Submittal Schedule.
This includes a list of all submittals required under the contract. The list
shall identify each major group of shop drawings, coordination drawings and
schedules and each sample and the planned submission date for each.
4.15.2 After the Engineer's review of the list of submittals, the Engineer will meet
with the Contractor for a joint review and correction and adjustment, as
necessary, for agreement on the submittal. In addition, at the meeting the
duration of the review period for each submittal will be established. The
Contractor's planned submission date for each submittal shall allow no less
than fifteen (15) working days for review and appropriate action before
approval of the submittal becomes critical to the progress of the Contractor's
work. Within five (5) calendar days after the joint review, the Contractor
shall make any necessary revisions to the list of submittals, including
durations of the review periods, in accordance with the agreements reached
during the joint review and submit two (2) revised copies to the Engineer.
No application for partial payment will be approved until the submitted
schedule is approved.
4.16 SHOP DRAWINGS:
4.16.1 Shop Drawings are drawings, diagrams, illustrations, schedules,
performance charts, brochures and other data which are prepared by the
Contractor or any subcontractor, manufacturer, supplier or distributor, and
which illustrate some portion of the work. It shall be the Contractor's
responsibility to furnish Shop Drawings as required by the technical
specifications or as requested by the Engineer. These submittals must be
made no later than is required by the Submittal Schedule.
4.16.2 Shop Drawings shall show the principal dimensions, weight, structural and
operating features, space required, clearances, type and/or brand of finish
or shop coat, grease fittings, etc., depending on the subject of the drawing.
When it is customary to do so, when the dimensions are of particular
importance, or when so specified, the drawings shall be certified by the
manufacturer or fabricator as correct for the contract.
4.16.3 When so specified or if considered by the Engineer to be acceptable,
manufacturer's specifications, catalog data, descriptive matter, illustrations,
etc., may be submitted for approval in place of Shop and Working Drawings.
In such case the requirements shall be as specified for Shop and Working
Drawings, insofar as applicable except that the submission shall be in
quadruplicate.
67
4.16.4 T
he Contractor shall be responsible for the prompt and timely submittal of all
Shop and Working Drawings so that there shall be no delay to the work due
to the absence of such drawings.
4.16.5 The Contractor shall check the Shop Drawings, shall coordinate them (by
means of coordination drawings wherever required) with the work of all
trades involved before submission and shall indicate thereon his approval.
Drawings and schedules submitted without evidence of the Contractor's
approval may be returned for resubmission.
4.16.6 By approving and submitting Shop Drawings, the Contractor thereby
represents that he has determined and verified all field measurements, field
construction criteria, materials, catalog numbers and similar data, or will do
so, and that he has checked and coordinated each Shop Drawing with the
requirements of the work and of the Contract Documents.
4.16.7 If drawings or schedules show variations from the contract requirements
because of standard shop practice or for other reasons, the Contractor shall
describe such variations in his letter of transmittal. If acceptable, the
Engineer may approve any or all such variations and issue an appropriate
Change Order. If the Contractor fails to describe such variations he shall
not be relieved of the responsibility for executing the work in accordance
with the contract, even though such drawings or schedules may have been
approved.
4.16.8 Each Shop Drawing or Coordination Drawing shall have a blank area five (5)
by five (5) inches located adjacent to the title block. The title block shall
display the following:
Number and Title of Drawing
Date of Drawing
Revision Number and Date (if applicable)
Project Title
Name of Project Building or Facility
Name of Contractor
Name of Subcontractor (if applicable)
Clear identity of contents and location of the work.
4.16.9 Prior to submitting drawings to the Engineer, the Contractor shall check
thoroughly all such drawings to satisfy himself that the subject matter
thereof conforms to the Drawings and Specifications in all respects. All
drawings which are correct shall be marked with the date, checker's name,
and indication of the Contractor's approval, and then shall be submitted to
the Engineer; other drawings shall be returned for correction.
4.16.10 The Contractor shall stamp all drawings which are to be submitted to the
Engineer for approval. The rubber stamp shall incorporate the following
items:
PROJECT TITLE __________________________________________
CONTRACTOR'S NAME ___________________________________
APPROVED BY
DATE _______________
SPECIFICATION SECTION TR
ANSMITTAL NO.______
4.16.11 The review of Shop Drawings will be general only and shall not relieve or, in
any respect, diminish the responsibility of the Contractor for details of
68
desig
n, dimensions, etc., necessary for proper fitting and construction of the
work as required by the contract and for achieving the result and
performance specified thereunder.
4.16.12 Should the Contractor submit for approval equipment that requires
modifications to the structures, piping, layout, etc., detailed on the Drawings,
he shall also submit for approval details of the proposed modifications. If
such equipment and modifications are approved, the Contractor, at no
additional cost to the Owner, shall do all work necessary to make such
modifications. Required structural changes shall be designed and detailed
by an Engineer registered in the state in which the project will be
constructed. Drawings shall be signed and show registration number or
may have seal affixed.
4.16.13 Submission of Shop Drawings shall be accompanied by a copy of a
transmittal letter containing project name, Contractor's name, number of
drawings, titles, specifications section and other pertinent data. The
submittal shall include the following:
6 legible copies of Shop Drawings or printed matter
4.16.14 The review of Shop Drawings will be performed by the Engineer as follows:
4.16.14.1 When the submittal conforms fully with the Contract Drawings and
Specifications, the Engineer will approve it. The reproducible of
each drawing or page of approved submittals will be stamped
approved, signed, dated and returned to the Contractor. No
changes shall be made on approved drawings by the Contractor.
If the Contractor desires to make any change from approved
drawings, or pages of approved submittals, he shall notify the
Engineer in writing that the approved material has been withdrawn
and shall submit the substitution set in accordance with the above
procedure.
4.16.14.2 When the submittal clearly does not conform with the Contract
Drawings and Specifications, the Engineer will disapprove it by
stamping it "Rejected." Rejected submittals shall be corrected
and resubmitted within fourteen (14) calendar days from the date
of rejection. Submittals which are rejected shall not be released
for any work.
4.16.14.3 When the submittal has only minor deviations from the Contract
Drawings and Specifications, the Engineer will note the deviations
and omissions as may be appropriate and approve the submittal
subject to the notations by stamping it "Approved as Noted."
Approved as Noted submittals may be released for fabrication of
work at the Contractor's risk; in any event the submittal shall be
corrected and resubmitted for approval within fourteen (14)
calendar days from the date of approval as noted.
4.16.15 The Contractor shall be responsible for delays resulting from the
rejection or approval as noted of incomplete, inadequate, incorrect or
otherwise unacceptable submittals.
4.16.16 The Contractor shall assure that only drawings and pages of printed
material bearing the Engineer's "Approved" stamp are allowed on the
job site.
4.16.17 The Contractor shall submit, at the completion of the project, one set of
69
all r
eviewed and corrected Shop Drawings, catalog cuts and
descriptive literature for the Owner before final Certificate of Payment
is issued.
4.17 OPERATING AND MAINTENANCE MANUALS:
4.17.1 One copy of each required Operating and Maintenance Manual must be
submitted to the Engineer with the first submittal of Shop Drawings. Five
additional copies of each required Operating and Maintenance Manual must
be submitted to the Engineer within fourteen (14) days of the return of
approved Shop Drawings to the Contractor. No payment will be approved
on any equipment for which Operating and Maintenance Manuals are
required until the Operating and Maintenance Manuals are received by the
Engineer. These Operating and Maintenance Manuals must be addressed
specifically to the piece of equipment supplied and shall not be general in
nature; each item must be clearly identified and located. Each page must
be printed on 8-½" x 11" paper or folded to that size in a manner which will
be suitable for insertion in a 3-ring binder.
4.18 SAMPLES:
4.18.1 Samples are physical examples furnished by the Contractor to illustrate
materials, equipment or workmanship, and to establish standards by which
the work will be judged. It shall be the Contractor's responsibility to furnish
samples as required by the Technical Specifications or as requested by the
Engineer. These samples must be submitted no later than is required by
the Submittal Schedule.
4.18.2 Each sample shall have a label indicating:
Project Title
Name of Project Building or Facility
Name of Contractor
Name of Subcontractor (if applicable)
Identification of Material with Specification Section
Name or Producer and Brand (if any)
4.18.3 Samples shall be submitted in duplicate unless otherwise noted in the
Technical Specifications and shall be accompanied by a copy of a
transmittal letter containing project name, Contractor's name, number of
samples, specification section and other pertinent data.
4.18.4 If the Engineer so requires, either prior to or after commencement of the
work, the Contractor shall submit samples of materials for such special tests
as the Engineer deems necessary to demonstrate that they conform to the
Specifications. Such samples shall be furnished, taken, stored, packed and
shopped by the Contractor as directed. Except as otherwise expressly
specified, the Contractor shall make arrangements for, and pay for, the
tests.
4.18.5 All samples shall be packed so as to reach their destination in good
condition. To insure consideration of samples, the Contractor shall notify
the Engineer by letter that the samples have been shipped and shall
properly describe the samples in the letter. The letter of notification shall be
sent separate from and should not be enclosed with the samples.
4.18.6 The Contractor shall submit data and samples, or place his orders,
sufficiently early to provide ample time for consideration, inspection, testing
and approval before the materials and equipment are needed for
incorporation in the work. The consequences of his failure to do so shall be
70
the Cont
ractor's sole responsibility.
4.18.7 In order to demonstrate the proficiency of workmen, or to facilitate the
choice among several textures, types, finishes, surfaces, etc., the
Contractor shall provide such samples of workmanship of wall, floor, finish,
etc., as may be required.
4.19 STORAGE OF MATERIALS AND EQUIPMENT:
4.19.1 All excavated materials, construction equipment, and materials and
equipment to be incorporated in the work shall be placed so as not to injure
any part of the work or existing facilities and so that free access can be had
at all times to all parts of the work and to all public utility installations in the
vicinity of the work. Materials and equipment shall be kept neatly piled and
compactly stored in such locations as will cause a minimum of
inconvenience to public travel and adjoining Owners, tenants and
occupants.
4.20 INSPECTION AND TESTING:
4.20.1 All materials and equipment used in the construction of the project shall be
subject to adequate inspection and testing in accordance with generally
accepted standards, as required and defined in the Contract Documents.
4.20.2 The Owner shall provide all inspection and testing services not required by
the Contract Documents.
4.20.3 The Contractor shall provide at his expense the testing and inspection
services required by the Contract Documents.
4.20.4 If the Contract Documents, laws, ordinances, rules, regulations or orders of
any public authority having jurisdiction require any work to specifically be
inspected, tested or approved by someone other than the Contractor, the
Contractor will give the Engineer timely notice of readiness. The Contractor
will then furnish the Engineer the required certificates of inspection, testing
or approval.
4.20.5 Inspections, tests or approvals by the Engineer or others shall not relieve
the Contractor from his obligations to perform the work in accordance with
the requirements of the Contract Documents.
4.20.6 The Engineer and his representatives will at all times have access to the
work. In addition, authorized representatives and agents of any participating
Federal or State agency shall be permitted to inspect all work, materials,
payrolls, records of personnel, invoices of materials and other relevant data
and records. The Contractor will provide proper facilities for such access
and observation of the work and also for any inspection or testing thereof.
4.20.7 If any work is covered contrary to the written instructions of the Engineer it
must, if requested by the Engineer, be uncovered for his observation and
replaced at the Contractor's expense.
4.20.8 If the Engineer considers it necessary or advisable that covered work be
inspected or tested by others, the Contractor, at the Engineer's request, will
uncover, expose or otherwise make available for observation, inspection or
testing as the Engineer may require, that portion of the work in question,
furnishing all necessary labor, materials, tools and equipment. If it is found
that such work is defective, the Contractor will bear all the expenses of such
uncovering, exposure, observation, inspection and testing and of
71
sati
sfactory reconstruction. If, however, such work is not found to be
defective, the Contractor will be allowed an increase in the contract price or
an extension of the contract time, or both, directly attributable to such
uncovering, exposure, observation, inspection, testing and reconstruction
and appropriate Change Order shall be issued.
4.21 SUBSTITUTIONS:
4.21.1 The Contractor may recommend the substitution of a material, article or
piece of equipment of equal function for those referred to in the Contract
Documents by reference to brand name or catalogue number, and if, in the
opinion of the Engineer, such material, article or piece of equipment is of
equal function to that specified, the Engineer may approve its substitution
and use by the Contractor. Any cost differential shall be deductible from the
contract price and the Contract Documents shall be appropriately modified
by Change Order. The Contractor warrants that if substitutes are approved,
no major changes in the function or general design of the project will result.
Incidental changes or extra component parts required to accommodate the
substitute will be made by the Contractor without a change in the contract
price or contract time.
4.22 ''OR EQUAL" CLAUSE:
4.22.1 The phrase "or equal" shall be construed to mean that material or
equipment will be acceptable only when in the judgement of the Engineer
they are composed of parts of equal quality, or equal workmanship and
finish, designed and constructed to perform or accomplish the desired result
as efficiently as the indicated brand, pattern, grade, class, make or model.
4.22.2 Whenever a material, article or piece of equipment is identified on the
Drawings or in the Specifications by reference to manufacturers' or vendors'
names, trade names, catalogue numbers, etc., it is intended merely to
establish a standard of quality and function; and, any material, article, or
equipment of other manufacturers and vendors which will perform
adequately the duties imposed by the general design will be considered
equally acceptable provided the material, article or equipment so proposed,
is, in the opinion of the Engineer, of equal substance and function. It shall
not be purchased or installed by the Contractor without the Engineer's
written approval.
4.23 WAGES AND OVERTIME COMPENSATION:
4.23.1 The Contractor and each of his subcontractors shall comply with all
applicable State and local laws or ordinances with respect to the hours
worked by laborers and mechanics engaged in work on the project and with
respect to compensation for overtime.
4.24 NO
WAIVER:
4.24.1 Neither the inspection by the Owner or the Engineer, nor any order,
measurement, approval, determination, decision or certificate by the
Engineer, nor any order by the Owner for the payment of money, nor any
payment for or use, occupancy, possession or acceptance of the whole or
any part of the work by the Owner, nor the extension of time, nor any other
act or omission of the Owner or of the Engineer shall constitute or be
deemed to be an acceptance of any defective or improper work, materials,
or equipment nor operate as a waiver of any requirement or provision of the
contract, nor of any remedy, power or right of or herein reserved to the
Owner, nor of any right to damages for breach of contract. Any and all
72
right
s and/or remedies provided for in the contract are intended and shall be
construed to be cumulative; and, in addition to each and every other right
and remedy provided for herein by law, the Owner shall be entitled as of
right to a writ of injunction against any breach or threatened breach of the
contract by the Contractor, by his subcontractors or by any other person or
persons.
4.25 WORK TO CONFORM:
4.25.1 During its progress and on its completion, the work shall conform truly to the
lines, levels, and grades indicated on the Drawings or given by the Engineer
and shall be built in a thoroughly substantial and workmanlike manner, in
strict accordance with the Drawings, Specifications, and other Contract
Documents and the directions given from time to time by the Engineer.
4.25.2 All work done without instructions having been given therefor by the
Engineer, without proper lines or levels, or performed during the absence of
the Engineer, will not be estimated or paid for except when such work is
authorized by the Engineer in writing. Work so done may be ordered
uncovered or taken down, removed and replaced at the Contractor's
expense.
4.26 WORKING HOURS:
4.26.1 It is contemplated that all work will be performed during the customary
working hours of the trades involved unless otherwise specified in this
contract. Work performed by the Contractor at his own volition outside such
customary working hours shall be at no additional expense to the Owner.
4.26.2 Any requests received by the Contractor from occupants of existing
buildings to change the hours of work shall be referred to the Owner for
determination.
5. INSURANCE, LEGAL RESPONSIBILITY AND SAFETY:
5.1 MEDIATION:
5.1.1 The Parties agree that all claims, disputes, and other matters (“Claims”) in
question between the Parties arising out of or relating to this Agreement or
breach thereof shall first attempt to be resolved between themselves including
escalating up to the appropriate levels of each Party. If after thirty (30)
business days following making of the Claim the Claim remains unresolved,
then the Parties agree to submit the Claim for confidential, non- binding
mediation with both Parties agreeing to the mediator no later than forty -five
(45) business days after written agreement to engage in mediation. The
Mediator must be located within 25 miles of the Mauldin City Hall. The fees
and expenses of the mediator shall be equally shared by both Parties. Each
Party is responsible for its own costs, expenses, consultant fees and attorney
fees incurred in the presentation or defense of the Claims that is subject to
mediation between the Parties. The Parties agree to fully cooperate and
participate in good faith to resolve the Claims. No written or verbal
representation made by either Party in the course of any discussions
attempting to resolve the Claims or other settlement negotiations shall be
deemed to be a party admission.
5.1.2 If mediation fails to resolve the Claims , arbitration shall be promptly
conducted in accordance with the Construction Industry Arbitration Rules of
73
the Amer
ican Arbitration Association or through such other neutral as the
parties may agree. The Contractor will be responsible for all costs associated
with the Arbitration.
5.1.3 The failure of either Party to enforce or act upon any right afforded it by this
Agreement shall not be deemed a waiver of such right for future acts of a
similar nature.
5.1.4 THE PARTIES AGREE TO WAIVE ANY RIGHT TO A TRIAL BY JURY AS
TO ANY CLAIM, COUNTERCLAIM, OR CAUSE OF ACTION OF ANY KIND
OR NATURE EITHER MAY HAVE HAD ARISING OUT OF OR RELATING
TO THIS AGREEMENT OR ANY TASK ORDER PERFORMED
HEREUNDER.
5.2 ASSIGNMENTS:
5.2.1 The Contractor shall not assign the whole or any part of the contract or any
monies due or to become due hereunder without written consent of the
Owner. In case the Contractor assigns all or any part of any monies due or
to become due under this contract, the instrument of assignment shall
contain a clause substantially to the effect that is agreed that the right of the
assignee in and to any monies due or to become due to the Contractor shall
be subject to prior claims of all persons, firms and corporations for services
rendered or materials supplied for the performance of the work called for in
this contract.
5.3 PERFORMANCE BOND AND PAYMENT BOND:
5.3.1 Unless otherwise noted in the Special Provisions, a Performance Bond and
a Payment Bond are required. The Contractor shall obtain a Performance
Bond and a Payment Bond, acceptable to the Owner in a surety company
authorized to do business in the state in which the project is constructed,
each for the full amount of the contract Sum. The bonds shall guarantee the
Contractor's faithful performance of the contract and the payment of all
obligations arising thereunder. The bonds shall remain in force until:
5.3.1.1 The project has been completed and accepted by the Owner.
5.3.1.2 The provisions of all guarantees required by these Contract
Documents have been fulfilled or the time limitation for all
guarantees has expired, or
5.3.1.3 The time for the filing of all mechanic's liens has expired, whichever
is longer, after which it shall become void.
5.3.2 The Contractor shall pay all charges in connection with the bonds as a part
of the contract. One executed copy of the bonds shall be attached to each
copy of the contract before they are returned to the Engineer for the
Owner's signature.
5.3.3 If the Contractor defaults, the Contractor or his Surety shall reimburse the
Owner for any additional engineering fees for additional services made
necessary because of the Contractor's default.
5.4 ADDITI
ONAL OR SUBSTITUTE BOND:
5.4.1 If at any time the Owner for justifiable cause, shall be or become dissatisfied
74
wit
h the surety or sureties for the Performance and/or Payment Bonds, the
Contractor shall within five (5) days after notice from the Owner to do so,
substitute an acceptable bond(s) in such form and sum and signed by such
other surety or sureties as may be satisfactory to the Owner. The premiums
on such bond(s) shall be paid by the Contractor. No further payments shall
be deemed due nor shall be made until the new surety or sureties shall have
furnished an acceptable bond(s) to the Owner.
5.5 CHANGES
NOT TO AFFECT BONDS:
5.5.1 It is distinctly agreed and understood that any changes made in the work or
the Drawings or Specifications therefor (whether such changes increase or
decrease the amount thereof or the time required for it performance) or any
changes in the manner or time of payments made by the Owner to the
Contractor, or any other modifications of the contract, shall in no way annul,
release, diminish or affect the liability of the Surety on the contract bonds
given by the Contractor, it being the intent hereof that notwithstanding such
changes the liability of the Surety on said bonds continue and remain in full
force and effect.
5.6 COMPLIANCE WITH LAWS:
5.6.1 The contract shall be governed by the law of the place where the project is
located. The Contractor shall abide by all local and State laws or
ordinances to the extent that such requirements do not conflict with Federal
laws or regulations. The Contractor shall keep himself fully informed of all
existing and future Federal, State and local laws, ordinances, rules and
regulations affecting those engaged or employed on the work, the materials
and equipment used in the work or the conduct of the work, and of all
orders, decrees and other requirements of bodies or tribunals having any
jurisdiction or authority over the same, including, but not limited to the U. S.
Department of Labor and Bureau of Standards Safety and Health
Regulations for Construction and its amendments as set up under the
Williams-Steiger Occupational Safety and Health Act of 1970. If any
discrepancy or inconsistency is discovered in the Drawings, Specifications
or other Contract Documents in relation to any such law, ordinance, rule,
regulation, order, decree or other requirement. The Contractor shall
forthwith report the same to the engineer in writing. The Contractor shall at
all times observe and comply with, and cause all his agents, servants,
employees and subcontractors to observe and comply with all such existing
requirements, and he shall protect, indemnify and save harmless the Owner,
its officers, agents, servants and employees, from and against any and all
claims, demands, suits, proceedings, liabilities, judgements, penalties,
losses, damages, costs and expense, including attorney's fees, arising from
or based upon any violation or claimed violation of any such law, ordinance,
rule, regulation, order, decree or other requirement, whether committed by
the Contractor or any of his agents, servants, employees or subcontractors.
5.7 REQUIRED PROVISIONS DEEMED INSERTED:
5.7.1 Each and every provision of law and clause required by law to be inserted in
this contract shall be deemed to be inserted herein, and the contract shall
be read and enforced as though it were included herein. If through mistake
or otherwise any such provision is not inserted, or is not correctly inserted,
then upon the application of either party the contract shall forthwith be
physically amended to make such insertion or correction.
5.8 LIENS:
75
5.8.1 I
f at any time any notice of liens are filed for labor performed or materials or
equipment manufactured, furnished or delivered to or for the work, the
Contractor shall, at his own cost and expense, promptly discharge, remove
or otherwise dispose of the same, and until such discharge, removal or
disposition, the Owner shall have the right to retain from any monies
payable hereunder an amount which, in his sole judgement, he deems
necessary to satisfy such liens and pay the costs and expenses, including
attorney's fees, of defending any actions brought to enforce the same, or
incurred in connection wherewith or by reason thereof.
5.9 CLAIMS:
5.9.1 If at any time there be any evidence of any claims for which the Contractor
is or may be liable or responsible hereunder, the Contractor shall promptly
settle or otherwise dispose of the same, and until such claims are settled or
disposed of, the Owner may retain from any monies which would otherwise
be payable hereunder so much thereof as, in his judgement, he may deem
necessary to settle or otherwise dispose of such claims and to pay the costs
and expenses, including attorney's fees, of defending any actions brought
to enforce such claims, or incurred in connection therewith or by reason
thereof.
5.10 INSURANCE:
5.10.1 The Contractor shall not commence any work until he obtains, at his own
expense, all required insurance. Such insurance must have the approval of
the Owner as to limit, form and amount. The Contractor will not permit any
subcontractor to commence work on this project until the same insurance
requirements have been complied with by such subcontractor.
5.10.2 The Contractor shall furnish the Owner with certificates showing the type,
amount, class of operations covered, effective dates and dates of expiration
of policies. Such certificates shall also contain substantially the following
statement: "The insurance covered by this certificate will not be cancelled
or materially altered, except after thirty (30) days notice in writing and
delivered by registered mail to the Owner." Should any policy be cancelled
before final payment by the Owner to the Contractor and the Contractor fails
immediately to procure other insurance as specified, the Owner reserves the
right to procure such insurance and to deduct the cost thereof from any sum
due the Contractor under this contract.
5.10.3 Any insurance bearing on adequacy of performance shall be maintained
after completion of the project for the full guaranty period. Should such
insurance be cancelled before the end of the guaranty period and the
Contractor fails immediately to procure other insurance as specified, the
Owner reserves the right to procure such insurance and to charge the cost
thereof to the Contractor.
5.10.4 Nothing contained in these insurance requirements is to be construed as
limiting the extent of the Contractor's responsibility for payment of damages
resulting from his operations under this contract.
5.10.5 The Contractor is required to obtain and maintain for the full period of the
contract the following types of insurance coverage with limits not less than
stated below:
5.10.5.1 WO
RKMEN'S COMPENSATION INSURANCE: As required by
applicable State or territorial law for all of his employees to be
engaged in work at the site of the project under this contract and,
76
in cas
e of any such work sublet, the Contractor shall require the
subcontractor similarly to provide Workmen's Compensation
Insurance for all of the latter's employees to be engaged in such
work unless such employees are covered by the protection
afforded by the Contractor's Workmen's Compensation Insurance.
In case any class of employee engaged in hazardous work on the
project under this contract is not protected under the Workmen's
Compensation Statute, the Contractor shall provide and shall
cause each subcontractor to provide adequate employer's liability
insurance for the protection of such of his employees as are not
otherwise protected.
5.10.5.2 CO
MPREHENSIVE GENERAL LIABILITY
Bodily Injury B odily Injury Property
Per Person Per Accident Damage
Premises and
Operations 500,000 1,000,000 1,000,000
Elevator Liability 500,000 1,000,000 1,000,000
Contractor's Pro-
tective Liability 500,000 1,000,000 1,000,000
Products Liability
Including Completed
Operations Coverage 500,000 1,000,000 1,000,000
The above Comprehensive General Liability Policy shall include
coverage for the explosion, collapse and underground (XCU)
hazards, and loss arising from nuisance, taking, whether inverse
taking or direct taking, or negligence.
The Property Damage Liability shall include the “Broad Form
Property Damage” endorsement.
5.10.5.3 CO
MPREHENSIVE AUTOMOBILE LIABILITY
All Owned Automobiles 500,000 1,000,000 1,000,000
Non Owned Automobiles 500,000 1,000,000 1,000,000
Hired Car Coverage 500,000 1,000,000 1,000,000
5.10.5.4 UMBR ELLA LIABILITY
The Contractor shall maintain a Comprehensive Umbrella Liability
Policy in excess of above insurance of $2,000,000 each
occurrence.
5.10.5.4 SUBCO
NTRACTOR'S LIABILITY INSURANCE:
Same limits as required of the General Contractor.
5.11 ORAL AGREEMENTS:
5.11.1 No oral order, objection, claim or notice by any party to the others shall
77
affec
t or modify any of the terms or obligations contained in any of the
Contract Documents, and none of the provisions of the Contract Documents
shall be held to be waived or modified by reason of any act whatsoever,
other than by a definitely agreed waiver or modification thereof in writing,
and no evidence shall be introduced in any proceeding of any other waiver
or modification.
5.12 SAFETY:
5.12.1 In accordance with generally accepted construction practices, the
Contractor shall be solely and completely responsible for conditions of the
job site, including safety of all persons and property affected directly or
indirectly by his operations during the performance of the work. This
requirement will apply continuously twenty-four (24) hours per day until
acceptance of the work by the Owner and shall not be limited to normal
working hours.
5.12.2 The Contractor shall take all reasonable precautions for the safety of, and
shall provide all reasonable protection to prevent damage, injury or loss to:
5.12.2.1 All employees on the work and all other persons who may be
affected thereby;
5.12.2.2 All the work and all materials and equipment to be incorporated
therein, whether in storage on or off the site, under the care,
custody or control of the Contractor or any of his subcontractors or
sub-subcontractors; and
5.12.2.3 Other property at the site or adjacent thereto, including trees,
shrubs, lawns, walks, pavements, roadways, structures and
utilities not designated for removal, relocation or replacement in
the course of construction.
5.12.3 The Contractor shall comply with all applicable laws, ordinances, rules,
regulations and lawful orders of any public authority having jurisdiction for
the safety of persons or property or to protect them from damage, injury or
loss. He shall erect and maintain, as required by existing conditions and
progress of the work, all reasonable safeguards for safety and protection,
including posting danger signs and other warnings against hazards,
promulgating safety regulations and notifying Owners and users of adjacent
utilities.
5.12.4 When the use or storage of explosives or other hazardous materials or
equipment is necessary for the execution of the work, the Contractor shall
exercise the utmost care and shall carry on such activities under the
supervision of properly qualified personnel. Prior approval of such materials
or services must be given by the Engineer.
5.12.5 The Contractor shall designate a responsible member of his organization at
the site whose duty shall be the prevention of accidents. This person shall
be the Contractor's superintendent unless otherwise designated in writing by
the Contractor to the Owner and the Engineer.
5.12.6 The Contractor shall not load or permit any part of the work to be loaded so
as to endanger its safety.
6. PROGRESS AND COMPLETION OF WORK
6.1 NOTICE TO PROCEED:
78
6.1.1 F
ollowing the execution of the Agreement by the Owner and the Contractor,
written Notice to Proceed with the work shall be given by the Owner to the
Contractor. The Contractor shall begin and shall prosecute the work
regularly and uninterruptedly thereafter (except as provided for herein) with
such force as to secure the completion of the work within the contract time.
6.2 CONTRACT TIME:
6.2.1 The Contractor shall complete, in an acceptable manner, all of the work
contracted for in the time stated in Section 01232, Special Provisions.
Computation of contract time shall commence the day to be specified in the
Notice to Proceed and every calendar days following, except as herein
provided, shall be counted as contract time.
6.3 SCHEDULE OF COMPLETION:
6.3.1 The Contractor shall submit, at such times as may be reasonable and
requested by the Engineer, schedules showing the order in which the
Contractor proposes to carry on the work, with dates at which the Contractor
will start the various parts of the work, and estimated date of completion of
each part.
6.4 WORK CHANGES:
6.4.1 The work comprises approximately the quantities shown in the Bid Schedule
which will be used as a basis for comparison of Bids and not for final
estimate. The Owner does not, by expression or by implication, agree that
the actual amount of work shall correspond with the estimated quantities.
6.4.2 The Owner reserves the right to increase the amount of work under the each
Bid Item in the Contract by twenty-five percent (25%) of the work
contemplated at the unit prices quoted in the Bid. The Owner reserves the
right to decrease the amount of work under each Bid Item in the Contract by
any amount without any change to the unit prices bid.
6.5 EXTRA WORK:
6.5.1 New and unforeseen items of work found to be necessary, and which
cannot be covered by any item or combination of items for which there is a
contract price, shall be classed as extra work. The Contractor shall do such
extra work and furnish such materials as may be required for the proper
completion or construction of the whole work contemplated, upon written
order from the Owner as approved by the Engineer. In the absence of such
written order, no claim for extra work shall be considered. Extra work shall
be performed in accordance with these Contract Documents where
applicable and work not covered by such shall be done in accordance with
the best construction practice and in a workmanlike manner. Extra work
required in an emergency to protect life and property shall be performed by
the Contractor as required.
6.6 EXTENSION OF CONTRACT TIME:
6.6.1 A delay beyond the Contractor's control occasioned by an Act of God, by act
or omission on the part of the Owner or by strikes, lockouts, fire, etc., may
entitle the Contractor to an extension of time in which to complete the work
as agreed by the Owner, provided, however, that the Contractor shall
immediately give written notice to the Owner of the cause of such delay.
79
6.6.2 A
ct of God shall mean an earthquake, flood, cyclone or other cataclysmic
phenomenon of nature. Rain, wind, flood or other natural phenomenon of
normal intensity for the locality shall not be construed as an Act of God and
no reparation shall be made to the Contractor for damages to the work
resulting therefrom.
6.6.3 All claims for extension of time shall be made in writing to the Engineer no
more than twenty (20) days after the occurrence of the delay; otherwise they
shall be waived. In the case of continuing cause of delay only one claim is
necessary. Any claim should include complete justification for the extent of
the delay claimed.
6.6.4 This Subsection does not exclude the recovery of damages for delay for
either party under other provisions of the Contract Documents.
6.7 ENGINEER'S CERTIFICATE OF SUBSTANTIAL COMPLETION:
6.7.1 When the work to be performed under this contract is substantially
completed In accordance with the Contract Documents, the Engineer shall
prepare an Engineer's Certificate of Substantial Completion to be
acknowledged and accepted by the Owner and the Contractor. The
Certificate may list items to be completed or corrected but such Certificate
shall not relieve the Contractor of his obligation to complete all work,
whether listed or not, in accordance with the Contract Documents nor will it
preclude any right the Owner may have for recourse in accordance with the
Contract Documents.
6.8 TERMINATIO
N OF CONTRACTOR'S RESPONSIBILITY:
6.8.1 The contract will be considered complete when all work has been finished,
the final review made up by the Engineer, and the project accepted in
writing by the Owner. The Contractor's responsibility shall then cease,
except as set forth in his Performance Bond, as provided in Subsection 4.6
Entitled GENERAL GUARANTY, and as provided in Subsection 6.9 entitled
CORRECTION OF FAULTY WORK AFTER FINAL PAYMENT.
6.9 CORRECTION OF FAULTY WORK AFTER FINAL PAYMENT:
6.9.1 The making of the final payment by the Owner to the Contractor shall not
relieve the Contractor of responsibility for faulty materials or workmanship.
The Contractor shall promptly replace any such defects discovered within
one year, except where longer periods are specified, from the date of written
acceptance of the work.
6.10 PROGRESS SCHEDULE:
6.10.1 Within twenty (20) days after execution and delivery of the Agreement and
not less than ten (10) days prior to making an application for partial
payment, the Contractor shall prepare and deliver to the Engineer a
Progress Schedule.
6.10.2 The schedule shall be set up in a bar chart format and shall show the
proposed dates of commencement and completion of the various
subdivisions of the work required under the Contract Documents and all
activities required to accomplish the work.
6.10.3 The schedule shall be updated monthly. No progress payments will be
made unless application is accompanied by the updated schedule.
80
6.11 SCHEDULES, REPORTS AND RECORDS:
6.11.1 The Contractor shall submit to the Owner such schedules of quantities and
costs, progress schedules, payrolls, reports, estimates, records and other
data where applicable as are required by the Contract Documents for the
work to be performed.
6.11.2 The Contractor shall also submit, in a format as approved by the Engineer, a
schedule of payments that he anticipates he will earn during the course of
the work.
6.12 ABANDONME
NT OF WORK OR OTHER DEFAULT:
6.12.1 If the work shall be abandoned, or any part thereof shall be sublet without
previous written consent of the Owner, or the Contractor or any monies
payable hereunder shall be assigned otherwise than as herein specified, or
if at any time the Engineer shall be of the opinion, and shall so certify in
writing, that the conditions herein specified as to rate or progress are not
being complied with, or that the work or any part thereof is being
unnecessarily or unreasonably delayed, or that the Contractor has violated
or is in default under any of the provisions of the contract, or if the
Contractor becomes bankrupt or insolvent or goes or is put into liquidation
or dissolution, either voluntarily or involuntarily, or petitions for an
arrangement or reorganization under the Bankruptcy Act, or makes a
general assignment for the benefit of creditors or otherwise acknowledges
insolvency, the happening of any of which shall be and constitute a default
under the contract, the Owner may notify the Contractor in writing, with a
copy of such notice mailed to the Surety, to discontinue such work or any
part thereof; thereupon the Contractor shall discontinue such work or such
part thereof as the Owner may designate; and the Owner may, upon giving
notice, by contract or otherwise as he may determine, complete the work or
such part thereof and charge the entire cost and expense of so completing
the work or such part thereof to the Contractor. In addition to the said entire
cost and expense of completing the work, the Owner shall be entitled to
reimbursement from the Contractor and the Contractor agrees to pay the
Owner any losses, damages, costs and expenses, including attorney's fees,
sustained or incurred by the Owner by reasons of any of the foregoing
causes. For the purposes of such completion the Owner may for itself or for
any Contractors employed by the Owner take possession of any and use or
cause to be used any and all materials, equipment, plant, machinery,
appliances, tools, supplies and such other items of every description that
may be found or located at the site of the work. No equipment or materials
may be removed from the work without the written consent of the Owner.
6.12.2 All costs, expenses, losses, damages, attorney's fees and any and all other
charges incurred by the Owner under this Subsection shall be charged
against the Contractor and deducted and/or paid by the Owner out of any
monies due or payable or to become due or payable under the contract to
the Contractor; in computing the amounts chargeable to the Contractor, the
Owner shall not be held to a basis of the lowest prices for which the
completion of the work or any part thereof might have been accomplished,
but all sums actually paid or obligated therefor to effect its prompt
completion shall be charged to and against the account of the Contractor.
In case the costs, expense, losses, damages, attorney's fees and other
charges together with all payments theretofore made or for the account of
the Contractor are less than the sum which would have been payable under
the contract if the work had been properly performed and completed by the
Contractor, the Contractor shall be entitled to receive the difference and, in
case such costs, expenses, losses, damages, attorney's fees and other
81
charges
together with all payments theretofore made to or for the account of
the Contractor, shall exceed the said sum, the Contractor shall pay the
amount of the excess to the Owner.
7. PAYMENTS TO THE CONTRACTOR
7.1 PRICES FOR WORK:
7.1.1 The Owner shall pay and the Contractor shall receive the prices stipulated in
the bid made a part hereof as full compensation for everything performed
and furnished and for all risks and obligations undertaken by the Contractor
under and as required by the contract.
7.2 SCHEDULE OF VALUES:
7.2.1 Except in cases where unit prices form the basis for payment under the
contract, the Contractor shall, within twenty (20) days of the execution of the
contract and not less than ten (10) days prior to making an application for
partial payment, submit to the Owner in a form approved by the Owner a
schedule of values showing a breakdown of the contract sum itemized by
trade and/or specification sections or as otherwise directed by the Owner
and for each item shall show the total value including the Contractor's
overhead and profit. Upon approval by the Owner, this schedule will be
used in determining the value of the work done for the purpose of partial
payments.
7.2.2 The costs employed in making up any of these schedules will be used only
for determining the basis of partial payments and will not be considered as
fixing a basis for additions to or deductions from the contract price.
7.3 APPLICATION FOR PARTIAL PAYMENT:
7.3.1 Before the first day of each month, or as otherwise directed by the Owner,
the Contractor shall make applications for the value of the work done.
Payment for materials stored on-site for use in this Contract will be paid
minus the specified retainage unless specified otherwise. The materials
must be properly stored and documented, and actual invoices must be
submitted with the Application for Payment. Such applications shall show
the breakdown of the project into the same items as the schedule of values
specified in Subsection 7.2, entitled SCHEDULE OF VALUES and showing
for each item the total value, the value previously reported as complete, the
value completed during the month, the cumulative value completed and the
value remaining to be done. The application shall include the total value
completed to date minus the amount of the retainage indicated in
Subsection 7.4 entitled RETAINAGE minus previous payments made to the
Contractor.
7.3.2 The Engineer will, within ten (10) days after receipt of each partial payment
estimate, either indicate in writing his approval of payment and present the
partial payment estimate to the Owner, or return the partial payment
estimate to the Contractor indicating in writing his reasons for refusing to
approve payment. In the latter case, the Contractor may make the
necessary corrections and resubmit the partial payment estimate.
7.4 RETAINAGE:
7.4.1 The Owner shall retain ten percent (10%) of the amount of each payment
until final completion and acceptance of all work covered by the contract
Documents.
82
7.5 PAYMENTS WITHHELD:
7.5.1 The Owner may withhold payment or, on account of subsequently
discovered evidence, nullify the whole or part of any application to the extent
necessary to protect himself from loss on account of:
7.5.1.1 Defective work not remedied.
7.5.1.2 Claims filed or reasonable evidence indicating the probably filing of
claims.
7.5.1.3 Failure of the Contractor to make payments to subcontractors,
material suppliers, or employees.
7.5.1.4 A reasonable doubt that the contract work can be completed for the
balance unpaid.
7.5.1.5 Damage to another Contractor.
7.5.2 When the above founds are removed, payment will be made for the
amounts withheld because of them.
7.6 PAYMENT OF APPLICATIONS FOR PARTIAL PAYMENT:
7.6.1 Upon verification and approval of the application for partial payment made
as specified, the Owner will make payment of the amount found properly
due. No payment made to the Contractor nor partial or entire use or
occupancy of the work by the Owner shall be an acceptance of any work or
materials not in accordance with this contract.
7.7 FINAL INSPECTION:
7.7.1 Upon receipt of written notice from the Contractor that the work has been
completed and finished in accordance with the contract, the Owner shall
cause an inspection to be made of the work by his authorized
representatives. If the Owner and/or Engineer believe the work is not
completed, the Contractor will be so advised, and the inspection will not be
performed until the outstanding issues are completed or corrected by the
Contractor. A list shall be made of all deviations from the contract
requirements (commonly termed "punch list") and a copy of such list
furnished to the Contractor. The Contractor shall with reasonable haste
remedy all defects so noted and shall notify the Owner upon the completion
of such work. When inspection by the Owner's authorized representatives
shows the work to be complete in accordance with the contract, application
for final payment may be made. All defects/deficiencies must be corrected
by the Contractor and acceptance of the work must be made by the Owner's
authorized representatives on or before the final completion date specified
in the Agreement. Liquidated damages will be assessed for each calendar
day after the specified final completion date required to complete all
punchlist items and obtain acceptance by the Owner’s representatives.
7.8 RELEASE OF LIENS:
7.8.1 Neither the final payment nor any part of the retained percentage shall
become due until the Contractor shall deliver to the Owner a complete and
notarized release of all liens arising out of this contract, or receipts in full in
lieu thereof, and if required in either case, an affidavit that so far as he had
knowledge the information, the releases and receipts include all the labor
83
and mater
ial for which a lien could be filed; but the Contractor may, if any
subcontractor refuses to furnish a release or receipt in full, furnish a bond
satisfactory to the Owner, to indemnify him against any lien. If any lien
remains unsatisfied after all payments are made, the Contractor shall refund
to the Owner all monies that the latter may be compelled to pay in
discharging such a lien, including all costs and a reasonable attorney's fee.
7.9 USE OR PARTIAL PAYMENT NOT ACCEPTANCE:
7.9.1 It is agreed that this is an entire contract for one whole and complete work
or result that neither the Owner's entrance upon or use of the work or any
part thereof nor any partial payments by the Owner shall constitute an
acceptance of the work or any part thereof before its entire completion and
final acceptance.
7.10 PAYMENT FOR UNCORRECTED WORK:
7.10.1 Should the Owner direct the Contractor not to correct work that has been
damaged or that was not performed in accordance with the Contract
Documents, an equitable deduction from the contract amount shall be made
to compensate the Owner for the uncorrected work.
7.11 PAYMENT FOR REMOVAL OR REJECTED WORK AND MATERIALS:
7.11.1 The removal of work and materials rejected in accordance with Subsection
4.3 entitled CORRECTION OF WORK BEFORE COMPLETION and the re-
execution of acceptable work by the Contractor shall be at the expense of
the Contractor, and he shall pay the cost of replacing the work of other
Contractors destroyed or damaged by the removal of the rejected work or
materials and the subsequent replacement of acceptable work.
7.11.2 Removal of rejected work or materials and storage of materials by the
Owner, in accordance with Subsection 4.3 entitled CORRECTION OF
WORK BEFORE COMPLETION, shall be paid by the Contractor within thirty
(30) days after written notice to pay is given by the Owner. If the Contractor
does not pay the expenses of such removal and after ten (10) days written
notice being given by the Owner of his intent to sell the materials, the Owner
may sell the materials at auction or at private sale and will pay the
Contractor the net proceeds therefrom after deducting all the costs and
expenses that should have been borne by the Contractor.
7.12 PAYMENT FOR EXTRA WORK:
7.12.1 Written notice of claims for payment for extra work shall be given by the
Contractor within ten (10) days after receipt of instructions from the Owner
to proceed with the extra work and also before any work is commenced,
except in emergency endangering life or property. No claim shall be valid
unless so made. In all cases, the Contractor's itemized estimate sheets
showing all labor and material shall be submitted to the Owner. The
Owner's order for extra work shall specify any extension of the contract time
and one of the following methods of payment:
7.12.1.1 Unit price or combinations of unit prices which formed the basis of
the original contract.
7.12.1.2 A lump sum based on the Contractor's estimate and accepted by
the Owner.
84
7.12.1.
3 Net cost plus a fixed fee. Net costs are defined as follows:
7.12.1.3.1 Labor costs, including time of foreman while engaged
directly upon extra work at rates not greater than the scale
rates for each respective classification of labor customary in
the area where the work is performed for each respective
job classification.
7.12.1.3.2 Labor insurance taxes including amounts paid on a percent
of such labor rate or on a cents per hour basis for
Workmen's Compensation, Public Liability, Contractor's
Contingent Liability and Contractual Liability Insurance and
all Federal Old Age and Unemployment Taxes and any
other taxes applicable as well as fringe benefits as may be
approved by the Engineer.
7.12.1.3.3 Materials and supplies actually used on the work.
7.12.1.3.4 Rental charges for necessary equipment, as agreed upon by
the Owner and Contractor. Rental charges shall not exceed
those published in Rental Rates for Construction Equipment
issued by the American Equipment Distributor, Equipment
and tools having a value of $100.00 or less are considered
to be "small tools" and, as such, are considered to be part of
overhead.
7.12.2 To the cost under 7.12.1.3 there shall be added a fixed fee to be agreed
upon but not to exceed fifteen percent (15%) of the estimated cost of the
work. The fee shall be compensation to cover the cost of supervision,
overhead, bond, profit and any other general expenses. On work performed
by subcontractors, the fixed fee shall not exceed five percent (5%) of the
cost of the work
7.13 PAYMENT FOR WORK SUSPENDED BY THE OWNER:
7.13.1 If the work or any part thereof shall be suspended by the Owner and
abandoned by the Contractor as provided in Subsection 2.12 entitled
SUSPENSION OF WORK, TERMINATION AND DELAY, the Contractor will
then be entitled to payment for all work done on the portions so abandoned,
plus fifteen percent (15%) of the value of the abandoned work to
compensate for overhead, plant expense, and anticipated profit.
7.14 PAYMENT FOR WORK BY THE OWNER:
7.14.1 The cost of work performed by the Owner, in accordance with Subsection
2.10 entitled OWNER'S RIGHT TO DO WORK, shall be paid by the
Contractor.
7.15 PAYMENT FOR WORK BY THE OWNER FOLLOWING TERMINATION OF
CONTRACT BY OWNER:
7.15.1 Upon termination of the contract by the Owner in accordance with
Subsection 2.11 entitled OWNER'S RIGHT TO TERMINATE CONTRACT,
no further payment shall be due the Contractor until the work is completed.
If the unpaid balance of the contract amount shall exceed the cost of
completing the work including all overhead costs, the excess shall be paid to
the Contractor. If the cost of completing the work shall exceed the unpaid
balance, the Contractor shall pay the difference to the Owner. The costs
incurred by the Owner, as herein provided, and the damage incurred
85
throug
h the Contractor's default, shall be certified by the Owner.
7.16 PAYMENT FOR SAMPLES AND TESTING OF MATERIALS:
7.16.1 Samples furnished in accordance with Subsection 4.18 entitled SAMPLES,
shall be furnished by the Contractor at his expense.
7.16.2 Testing of samples and materials furnished in accordance with Subsection
4.18 entitled SAMPLES, shall be arranged and paid for by the Owner.
7.17 ACCEPT ANCE AND FINAL PAYMENT:
7.17.1 When the Contractor shall have completed the work in accordance with the
terms of the Contract Documents, he shall certify completion of the work to
the Owner and submit a final Request for Payment, which shall be the
contract amount plus all approved additions, less all approved deductions
and less previous payments made. The Contractor shall furnish evidence
that he has fully paid all debts for labor, materials and equipment incurred in
connection with the work, and, upon acceptance by the Owner, the Owner
will release the Contractor except as to the conditions of the Performance
Bond and the Payment Bond, any legal rights of the Owner, required
guaranties, and Correction of Faculty Work after Final Payment, and will pay
the Contractor's final Request for Payment. The Contractor shall allow
sufficient time between the time of completion of the work and approval of
the final Request for Payment for the Engineer to assemble and check the
necessary data.
7.17.2 The Contractor shall deliver to the Owner a complete release of all liens
arising out of the contract before the retained percentage or before the final
Request for Payment is paid.
7.18 ACCEPT
ANCE OF FINAL PAYMENT AS RELEASE:
7.18.1 The acceptance by the Contractor of final payment shall be and shall
operate as a release to the Owner of all claims and all liability to the
Contractor other than claims in stated amounts as may be specifically
excepted by the Contractor for all things done or furnished in connection
with this work and for every act and neglect of the Owner and other relating
to or arising out of this work. Any payment, however, final or otherwise,
shall not release the Contractor or his sureties from any obligations under
the Contract Documents or the Performance Bond and the Payment Bond.
7.19 DELAYS AND DAMAGES:
7.19.1 The date of beginning and the time for completion of the work are essential
conditions of the Contract Documents and the work embraced shall be
commenced on a date specified in the Notice to Proceed.
7.19.2 The Contractor will proceed with the work at such rate of progress to insure
full completion within the contract time. It is expressly understood and
agreed by and between the Contractor and the Owner that the contract time
for the completion of the work described herein is a reasonable time, taking
into consideration the average climatic and economic conditions and other
factors prevailing in the locality of the work. If the Contractor refuses or fails
to prosecute the work, or any separable part thereof, with such diligence as
will insure its completion within the time specified in the contract, or any
extension thereof, or fails to complete said work within such time, the
Owner, may, by written notice to the Contractor and his Surety, terminate
his right to proceed with the work or such part of the work as to which there
86
has been a
delay. In such event the Owner may take over the work and
prosecute the same to completion, by contract or otherwise, and may take
possession of and utilize in completing the work such materials, appliances
and plant as may be on the site of the work and necessary therefor.
Whether or not the Contractor's right to proceed with the work is terminated,
he and his sureties shall be liable for any damage to the Owner resulting
from his refusal or failure to complete the work within the specified time.
7.19.3 If fixed and agreed liquidated damages are provided in the contract and if
the Owner so terminates the Contractor's right to proceed, the resulting
damage will consist of such liquidated damages until such reasonable time
as may be required for final completion of the work together with any
increased costs occasioned the Owner in completing the work.
7.19.4 If fixed and agreed liquidated damages are provided in the contract, and if
the Owner does not so terminate the Contractor's right to proceed, the
resulting damage will consist of such liquidated damages until the work is
completed or accepted.
7.19.5 The Contractor's right to proceed shall not be so terminated nor the
Contractor charged with resulting damage if:
7.19.5.1 The delay in the completion of the work arises from unforeseeable
causes beyond the control and without the fault or negligence of
the Contractor, including but not restricted to, Acts of God, acts of
the public enemy, acts of the Government in either its sovereign or
contractual capacity, acts of another Contractor in the
performance of a contract with the Owner, fires, floods, epidemics,
quarantine restrictions, strikes, freight embargoes, unusually
severe weather or delays of subcontractors or supplies arising
from unforeseeable causes beyond the control and without the
fault or negligence of both the Contractor and such subcontractors
or suppliers; and
7.19.5.2 The Contractor, within ten (10) days from the beginning of any
such delay (unless the Owner grants a further period of time
before the date of final payment under the contract), notifies the
Owner in writing of the causes of delay.
7.19.6 As used in subparagraph 7.19.5.1, above, the term "subcontractors and
suppliers" means subcontractors or suppliers at any tier.
7.19.7 The Engineer shall ascertain the facts and the extent of the delay and
extend the time for completing the work when, in his judgement, the findings
of fact justify such an extension, and his findings of fact shall be final and
conclusive on the parties, subject only to appeal as provided in these
General Conditions.
7.19.8 The rights and remedies of the Owner provided in this clause are in addition
to any other rights and remedies provided by law or under this contract.
(End of Section 00700)
87
NOTICE TO PROCEED
To: CaJenn Construction and Rehabilitation Services, Inc.
P.O. Box 38
Hoboken, GA 31542
Attn: Christy Jennings
Date: ______________________
Project: 2022-2023 SEWER REHABILITATION PROJECT
You are hereby notified to commence Work in accordance with the Agreement dated
_______________, 20___ on or before_______________,20___, and you are to complete the
Work by ____________________________ (365 calendar days).
City of Mauldin (Owner)
By:____________________________
Title:__________________________
ACCEPTANCE OF NOTICE
Receipt of the above Notice to Proceed is hereby acknowledged by CaJenn Construction and
Rehabilitation Services, Inc., this _______ day of ____________________, 2022.
By:_____________________________________
Title:____________________________________
88
CHANGE ORDER AGREEMENT
OWNER: CITY OF MAULDIN Change Order No.____________________
Date:______________________________
PROJECT: 2022-2023 SEWER REHABILITATION PROJECT
The following changes are made to the Contract Documents:
(Attach any drawings or other documentation necessary to explain or demonstrate this change.)
Original CONTRACT PRICE: $___________________________________
Current CONTRACT PRICE as adjusted by previous CHANGE ORDERS:
$____________________________________
The CONTRACT PRICE due to this CHANGE ORDER will be (increased) (decreased) by:
$____________________________________
The new CONTRACT PRICE including this CHANGE ORDER will be:
$____________________________________
The CONTRACT TIME will be (increased) (decreased) by _______ calendar days due to this
CHANGE ORDER. The date of completion of all work will be ________________, 20___.
THE CONTRACTOR AFFIRMS, REPRESENTS AND WARRANTS AS OF THIS DATE
THAT THERE ARE NO OTHER OUTSTANDING CHANGE ORDERS REQUIRED BY THE
CONTRACTOR, OR OUTSTANDING CLAIMS FOR ANY ADDITIONAL MONEY OR
COSTS, INCLUDING IMPACT COSTS OR DAMAGES OR CLAIMS FOR TIME
EXTENSION, OR CLAIMS OF ANY OTHER KIND OR NATURE AGAINST THE OWNER,
EXCEPT THE FOLLOWING: (Describe separately here any such claim, state the total dollar
amount and/or time extension sought per claim alleged to be due from the Owner, and the status
of the claim as of this date.)
______________________________________________________________________________
______________________________________________________________________________
Requested by:__________________________________________________________________
Recommended
by:_______________________________________________________________
(Engineer’s Signature and Title)
89
AGREED: OWNER AGREED: CONTRACTOR
By:_________________________________ By:________________________________
Date:_______________________________ Date:______________________________
90
APPLICATION FOR PAYMENT
OWNER: CITY OF MAULDIN
CONTRACTOR: CAJENN CONSTRUCTION & REHABILITATION SERVICES, INC.,
ENGINEER: FRAZIER ENGINEERING, P.A.
NAME OF PROJECT: 2022-2023 SEWER REHABILITATION PROJECT
APPLICATION FOR PAYMENT NO.: ____________
CONSTRUCTION PERIOD: FROM: _______________ TO: _________________
******************************************************************************
SUMMARY OF WORK
Total Contract Work Performed to Date: $__________________________________
Materials Stored on Jobsite $__________________________________
Total Change Order Work to Date: $__________________________________
Subtotal to date: $__________________________________
Less 10% Retainage $__________________________________
Subtotal: $__________________________________
Less Previous Payments: $__________________________________
Amount Due This Application for Payment $__________________________________
******************************************************************************
THE CONTRACTOR BY PRESENTING THIS PAY ESTIMATE STATES, REPRESENTS
AND WARRANTS THAT AS OF THE DATE OF THIS REQUEST THERE ARE NO
OUTSTANDING CLAIMS ON HIS BEHALF AGAINST THE OWNER FOR ANY
ADDITIONAL MONEY, COSTS OR DAMAGES, (INCLUDING IMPACT COSTS OR
DAMAGES), OR CLAIMS ARISING FROM DELAY OR FROM THE DENIAL OR THE
GRANTING OF TIME EXTENSIONS, OR FROM CLAIMS OF ANY OTHER KIND OR
NATURE EXCEPT FOR THE FOLLOWING: (DESCRIBE HERE THE NATURE OF ANY
SUCH CLAIMS, THE DATE EACH CLAIM AROSE, THE DATE NOTICE WAS GIVEN
PURSUANT TO THE GENERAL CONDITIONS, THE EXACT AND TOTAL DOLLAR
AMOUNT CLAIMED, AND THE STATUS OF EACH CLAIM AS OF THIS DATE:
______________________________________________________________________________
______________________________________________________________________________
91
The Contractor has attached a Schedule of Values showing all Bid Items included in the BID.
The Schedule of Values includes the quantity, location of work performed, and value of work
completed for each Bid Item since the previous pay application and the quantity and value of
work completed to date for each Bid Item. An itemized spreadsheet is provided with the
Application for Payment detailing and documenting the specific location of all work performed
since the previous Application for Payment.
In addition, by submitting and signing this Application for Payment, the Contractor certifies that
progress payments previously received from the OWNER on account of the work for the
PROJECT have been applied by the Contractor to discharge in full all of the Contractor’s
obligations incurred in connection with the work covered by all prior Applications for Payment,
including full payment of materials purchased and full payment to subcontractors.
SUBMITTED RECOMMENDED FOR APPROVAL
CONTRACTOR: CAJENN CONSTRUCTION ENGINEER: FRAZIER ENGINEERING
By: _______________________________ By: _______________________________
Date: _____________________________ Date: _____________________________
APPROVED
OWNER: CITY OF MAULDIN
By: ________________________________________
Date: ________________________________________
92
SECT
ION 01010
SUMMARY OF WORK AND SPECIAL PROVISIONS
PART 1 GENERAL
1.1 SCOPE OF WORK
A. PROJECT FUNDING: The Project will be funded by the City of
Mauldin’s current ARPA funds allocated to sewer system improvements.
There are no special requirements or contract provisions that the Contractor
must abide by (no Davis-Bacon Wage issues, no certified payrolls, etc.).
B. PIGGYBACK CONTRACT: Work performed under these Contract
Documents will utilize existing unit pricing, specifications, and details
from Metropolitan Sewer Subdistrict’s (MetroConnects) “FM400B-343
Basin Find & Fix CIPP Project” that was bid on February 10, 2022.
The Contractor’s Bid and Specifications from the MetroConnects’ Contract
are being incorporated into this Contract. Anywhere MetroConnects or
Owner are included in the Documents it shall mean the City of Mauldin.
C. This Project will be used to rehabilitate sewers throughout the Owner’s
sewer system. It is anticipated that the work will primarily occur in Basins
4 and 5, but work may be issued anywhere within the City’s service area.
The Engineer will issue Drawings to the Contractor to define the required
work. The Engineer will utilize television inspections of the sewers
performed by the Contractor and manhole inspections performed by the
Engineer to define the exact required work.
The required rehabilitation work may include any of the Bid Items. The
work included in this Project may include any of the following work items.
- Cleaning and televising existing sewers to evaluate the sewers, identify
defects that need repaired, and determine the final rehabilitation to be
performed under this Contract
- Performing point repairs to existing sewers (via excavation) to repair
specific sewer defects; point repairs may be stand-alone repairs with
no other rehabilitation to that sewer or repairs to facilitate lining the
sewer with CIPP
- Replacing sewers from manhole to manhole and installing new
manholes (via excavation) (to be paid under the point repair bid item)
- Lining existing sewers with cured-in-place pipe lining (CIPP)
- Lining specific laterals with CIPP as deemed necessary by the
Engineer (the Owner does not own the laterals so any work on laterals
93
wil
l be based on very specific needs/defects).
- Installing new manholes to replace existing manholes or to provide a
manhole where one does not currently exist.
- Performing various manhole rehabilitation including locating and
raising manholes, replacing and adjusting frames and covers,
rebuilding benches and inverts, etc. (manhole coating with spray-
applied cementitious mortar is not included in this project – has been
completed previously where needed).
- Performing miscellaneous work and restoration
C. The Contractor will be paid for the actual work completed. The actual
amounts of work done under unit price items may differ from the quantities
shown in the Bid Form for the MetroConnects’ project (piggyback
contract). The basis of payment for work shall be the actual amount of
work done. The Contractor agrees that he will make no claim for damages,
anticipated profits, or otherwise on account of any difference between the
amounts of work actually performed and the estimated amounts shown on
the Bid Form – this specification shall take precedence over any other
specification(s) related to bid quantities located elsewhere in these
Specifications.
The total value of work shall not exceed the Contract amount unless
approved by the Owner in writing (by a change order or written
authorization). The Engineer will continuously review the actual quantities
and value of work completed with the Contract amount. The Engineer may
need to eliminate some of the work so as not to exceed the Contract
amount.
Refer to Section 01270 – Measurement and Payment – for description and
details of the bid items.
D. Contract Time and Liquidated Damages:
Notice to Proceed for this Contract is expected to be issued in October
2022. The Contractor shall perform work and achieve Final Completion
within 365 days of Notice to Proceed. Final Completion shall mean all
work is complete including restoration, acceptance testing, and punchlist
items, all requirements of the Contract have been met, and all final
paperwork has been submitted so that final payment can be made to
include payment of all remaining retainage.
Liquidated damages in the amount of $750 per day will be assessed for
each calendar day beyond Final Completion.
E. State and Local Permits, Licenses, Inspections, and Certificates: The
94
Contr
actor shall obtain such required documents and permits and pay the
fees assessed for the work for which such permits, licenses, and inspections
are required. The Contractor is advised that a City of Mauldin business
license will be required for this Project. The Contractor shall contact the
City to obtain the license amount. The City will not execute the Contract
Agreement until the Contractor obtains the business license.
1.2 OWNER AND ENGINEER
A. The OWNER as referenced in these Specifications is the City of Mauldin
(City).
B. The ENGINEER as referenced in these Specifications is either the City or
Frazier Engineering, P.A. who has been retained by the City to design this
project and to provide construction administration services on behalf of the
City. Communications during this Contract shall be through Frazier
Engineering, P.A., located at 6592 Bob White Trail, Stanley, NC 28164
(Phone: 704-822-8444).
C. The Engineer and/or the Owner will have an on- site representative to
inspect the work as it progresses.
1.3 QUALIFICATIONS
A. The Contractor shall be fully qualified and experienced to perform the
work included in this Project. Specific experience requirements are
included in the Specifications for the cured-in-place pipe lining (CIPP) –
refer to Specification Sections 02766, 02767 and 02768. For the
excavation work, the Contractor shall be fully experienced in sewer
rehabilitation construction including handling wastewater flow through
bypass pumping, working around existing utilities and in tight corridors,
trench shoring and sheeting including around existing utilities, connecting
new sewers to existing sewers and manholes, grass and asphalt restoration
including patching, dealing with the public and residents, providing
thorough traffic control, and all else required to replace existing sewers and
service laterals. Specific project references may be requested by the
Owner prior to award of this Contract.
B. The Contractor shall submit the anticipated percentage of work that will be
performed with his/her forces and the percentage of work that will be
performed by subcontractors (based on the bid quantities) at the
preconstruction conference.
C. The Contractor shall have a written Safety Plan. The Owner may request a
copy of the Plan. All personnel working on this Project shall adhere to the
95
Contr
actor’s Safety Plan and all other regulations governing this work. All
personnel on the project shall be trained and certified to meet OSHA’s
Confined Space Entry regulations. Safety and meeting all regulations is
the sole responsibility of the Contractor. Unsafe work and entering
manholes without following confined space requirements/procedures may
result in immediate termination of this Contract by the Owner. Safety shall
be of the utmost importance to the Contractor at all times. The Contractor
shall continuously comply with all safety requirements from all regulatory
agencies.
D. The Contractor shall hold any and all other necessary qualifications,
certifications, training, etc. that may be required to complete this Project,
including any traffic control training/certifications that may be required,
use of software, use of equipment as recommended by equipment
manufacturers and suppliers, etc.
E. Subcontractors shall also meet the specified qualifications and
requirements. The Contractor shall submit information on any proposed
subcontractor prior to performing any work. The Owner may request this
information after receiving bids and prior to Contract award. The Owner
must approve any subcontractor and reserves the right to reject any
subcontractor. The Contractor shall not be due any additional money if
subcontractors are not approved.
1.4 PROJECT MANAGEMENT AND SUPERVISION
A. The Contractor shall provide adequate project management and supervision
throughout this Contract. At a minimum, the Contractor shall provide a
full-time, Project Manager and a full -time, on-site General Superintendent.
The Contractor is advised that management and supervision of this Project
will be extensive and take significant time and effort. In addition, each
crew, including subcontractor’s crews, must have an experienced, English -
speaking foreman. The Contractor’s General Superintendent(s) must be
on-site to observe the work at all times when work is being performed,
including work performed by subcontractors. Work shall cease whenever
the General Superintendent(s) is not on- site to observe the work. The
Engineer may allow the Contractor’s foremen to act on behalf of the
General Superintendent if so requested but will not allow subcontractor’s
foremen to act in such a manner. The Contractor’s General
Superintendent(s) must observe all work performed by subcontractors.
B. The Contractor’s full -time Project Manager shall manage and supervise
this Contract throughout its duration. The Project Manager shall have a
minimum of 5 years of experience managing and supervising this type of
construction, including excavation, sewer rehabilitation work, and ma nhole
96
rehab
ilitation, backed up by project references. The references must
clearly indicate that the proposed person acted as the Project Manager. The
Project Manager’s obligations, duties and responsibilities shall include, but
not be limited to, the following:
1) serve as main point of contact for Engineer and the City with authority
to act on behalf of the Contractor
2) prepare, process, submit and administer shop drawings and other
submittals
3) perform field engineering
4) coordinate with property owners and the public
5) coordinate with other utilities
6) coordinate with the DOT
7) prepare and process proposals, change orders, field orders, etc.
8) administer and coordinate subcontracts to ensure that quality work is
being performed
9) coordinate, prepare and submit all required schedules and accurately
update schedules for presentation at progress meetings
10) prepare, modify, coordinate and administer payment applications
11) prepare accurate and complete record drawings
12) provide general quality control to ensure that all Contract work meets
or exceeds the Contract requirements
13) attend all project meetings
C. The Contractor’s full-time, on-site General Superintendent(s) shall be on -
site during all construction activities including work by subcontractors.
The General Superintendent (s) shall have at least 5 years of experience
managing and supervising this type of construction, including excavati on,
sewer rehabilitation work, sewer lining, and manhole rehabilitation, and
supervising subcontractors as backed up by project references. The
references must clearly indicate that the proposed person(s) acted as the
General Superintendent. The General Superintendent’s obligations, duties
and responsibilities shall include, but not be limited to, the following:
1) serve as main contact point for Engineer’s on-site representative
2) work with Engineer’s on- site representative to ensure a high quality
project t hat meets the Engineer and the City’s expectations and the
Contract requirements - failure to work with the Engineer’s on- site
representative in good faith shall result in removal of the
superintendent from the job and replacement with a suitable
superintendent
3) coordinate all work and work schedules with the Engineer’s on- site
representative
4) supervise all field work including work of Contractor’s forces
(foreman, laborers, etc) and subcontractors
97
5) ensur
e that all discussions with the Engineer’s on- site representative
are implemented by Contractor’s forces
6) coordinate with property owners and the public and supervise the
distribution of project notifications
7) ensure that all approved submittals and traffic control plans are being
followed and implemented by Contractor’s forces
8) review quantities being requested for monthly payment applications
with the Engineer’s on-site representative
9) provide general quality control to ensure that all Contract work meets
or exceeds the Contract requirements
10) attend all project meetings
D. Each foreman proposed to act as such on this Contract must have a
minimum of 2 years experience as a foreman for the specific work he/she
is proposed to supervise. References must be submitted to demonstrate
that the proposed person(s) have the required experience. The references
must clearly indicate that the proposed person(s) acted as a foreman.
E. The resumes and project references (names and phone numbers) of the
proposed Project Manager, General Superintendent(s) and foremen shall
be submitted to the Engineer and Owner for review and approval prior to
the preconstruction conference. The Engineer and Owner will contact
references to determine if the proposed persons meet the requirements
specified herein. The findings of the Engineer and Owner will be issued
prior to the preconstruction conference if adequate time is available or at
the preconstruction conference. The Engineer and Owner may request
interviews with the proposed person(s). The Engineer and Owner’s
decision on the acceptability of the proposed person(s) shall be final, and
the Contractor shall immediately propose alternate personnel that meet the
specified requirements if the proposed person(s) is denied. No waivers of
these requirements shall be permitted. No work shall begin until the
Project Manager, General Superintendent and foremen are approved and
are on-site working on this project.
F. The Contractor shall not replace or substitute the Project Manager,
General Superintendent(s) and foremen without obtaining prior approval
from the Engineer and Owner. The Contractor shall make any such
request to change supervision in writing, and the Owner and Engineer will
respond within 10 business days of the request. Work shall cease on the
project any time such a change is made until approval of new supervision
is granted to the Contractor. Additional or alternate supervisory personnel
must meet all of the above requirements.
98
G. Paym
ent for all project management and supervision shall be a mandatory
subsidiary obligation under the Contract, and no separate payment will be
made by the Owner.
PART 2 PRODUCTS
2.01 SUBSTITUTIONS AND PRODUCT OPTIONS
A. The Specifications include specific product names that are approved for
installation in this Contract. Whenever a product name is specified followed by
the phrase “or equal,” the specific product mentioned shall be the basis upon
which bids are to be prepared, and shall be understood as establishing the type,
function, dimension, appearance and quality desired.
B. Other manufacturer's or vendor's products not named will be considered as
substitutions if a written req uest for such substitution is made at least seven (7)
days prior to the scheduled bid opening. The requests for substitution shall
include complete data (including product literature, reference standards and
performance and test data) substantiating compliance of the proposed substitution
with the requirements stated in the Specifications. A list of product installations
by the Contractor and proposed superintendent/foreman including quantities
installed, dates of installation, and references (name, address, and phone numbers)
shall also be submitted. Any approved substitutions and/or additions may be
made by addendum or by written approval (letter or e-mail).
C. The requests for substitution must include a written and signed statement from the
Contractor a nd/or manufacturer stating that the Contractor/manufacturer will
adhere to all parts and requirements of the Specifications outlined herein and that
no exceptions to any part of the Specifications will be taken.
D. The Owner’s/Engineer's decision regarding evaluation and acceptance of
substitutions shall be final and binding.
2.02 SEWER AND MANHOLE MATERIALS
A. All point repairs shall be made using ductile iron pipe (P ressure Class 350) or
PVC pipe as specified by the Engineer. In general, PVC pipe shall be used when
the point repair will be lined over with CIPP , and ductile iron pipe shall be used
when the point repair is a stand- alone repair. New main sewer pipes installed
from manhole to manhole shall be either SDR -26 PVC or Pressure Class 350
ductile iron as specified for each replacement. Ductile iron pipe does not require
Protecto 401 coating. SDR-35 PVC shall not be used on this contract.
B. New service lateral connections inst alled within point repair segments shall be
made using ductile iron tee-wyes only. When the point repair is made using PVC
99
pipe, pr
ovide appropriate transition gaskets to the ductile iron tee -wye. When the
sewer is being replaced from manhole to manhole, the service tees or wyes shall
match the new main sewer pipe material. New service lateral pipes shall be SDR
26 PVC or Pressure Class 350 as specified.
C. Manholes shall be as specified in the standard specifications and details.
2.03 S PECIAL EXCAVATION AND BACKFILL REQUIREMENTS
A. The standard excavation and backfill requirements for this Project allow the
excavated soil to be used for backfill as long as the soil is suitable for backfilling .
If the excavated soil is not suitable as agreed to by the Engineer, then imported
select fill or ABC stone shall be used for backfill. Such imported material will be
paid at the unit prices bid.
B. In some circumstances such as in SC DOT or City /County roads, the excavated
soil may not be allowed for backfill and ABC stone or flowable fill may be
required for backfilling the trench. Payment will be made for ABC stone and
flowable fill as required and as directed by the Engineer at the unit prices bid (as
applicable).
C. Soil density testing may be performed and paid for by the City.
PART 3 EXECUTION
3.1 P ROJECT MEETINGS
A Preconstruction Meeting shall be held prior to performing any work. The
Contractor, his proposed Project Manager and full-time on-site Project
Superintendent and any proposed subcontractors shall attend the meeting. The
project scope, requirements and submittals as specified herein will be reviewed
and discussed. The Contractor shall present the proposed project schedule at the
preconstruction meeting. Other meetings will be held throughout the Project as
deemed necessary (expected to be monthly at a minimum). The Contractor shall
provide updated schedules at all meetings.
3.2 PUBLIC NOTIFICATION
A. The Contractor shall continuously notify the public of the work being performed.
At a minimum, the Contractor shall be required to do the following:
1. The Contractor shall distribute a letter describing the overall project and work
to be performed to all property owners in the project area. The letter shall be
distributed at least 1 week and no more than 2 weeks prior to performing any
work in the area. The Engineer will provide the context for the letter. The
100
Contr
actor shall put the letter on his letterhead and shall include contact
names and local phone numbers for the Contractor’s project manager,
superintendent, and the Engineer’s or Owner’s on-site representative.
2. The Contractor shall distribute door hangers to each property owner affected
by the work 72 hours prior to performing any work. The Contractor shall
submit a sample door hanger to the Engineer and Owner for review. The door
hangers shall include the specific work to be performed, contact names and
local phone numbers for the Contractor’s project manager, superintendent,
and the Engineer’s on -site representative. Door hangers will be required for
each phase of the work unless approved otherwise by the Engineer.
B. Payment for all public notification shall be a mandatory subsidiary obligation
under the Contract, and no separate payment will be made by the Owner.
3.3 WEEKLY WORK SCHEDULES AND WORK COMPLETE FORMS
A. The Contractor shall submit a weekly construction schedule for the upcoming
week by noon every Friday. The schedule shall define all construction activities
for the week including specific work between specific manholes. If changes
occur to the schedule, the schedule shall be immediately updated and resubmitted
to the Engineer. The Engineer may request that the construction schedules be
submitted to other agencies such as SCDOT . Work not scheduled shall not be
performed or approved for payment.
B. In addition, the Contractor shall submit to the Engineer work complete forms
every Friday. The work complete forms shall document all work completed
during the week, including quantities for each bid i tem, and shall list all
equipment used during the week and all personnel on the job each day.
3.4 WORK HOURS
A. Normal work hours shall be 8:00 am to 5:00 pm, Monday through Friday, except
for legal holidays observed by the Owner when no work shall be performed. A
normal work week shall be defined as 40 hours. It is anticipated that work in
residential areas and easement areas will be completed during the normal work
hours.
B. For work in major thoroughfares, the SCDOT may require that the work be
performed between 9:00 am and 4:00 pm or from 7:00 pm to 6:00 am or on
weekends. No additional payment shall be made to the Contractor for working
within these restricted work hours. Work hours in major thoroughfares must be
approved in advance by SCDOT and the Owner/Engineer.
101
C. Any re
quests to work at times different from those specified or requests to work
longer than the normal 40- hour work week shall be made in writing by the
Contractor to the Engineer. Requests shall be made at a minimum of 72 hours
prior to the requested change. The Engineer will review such requests and issue a
decision on the request. The Engineer’s decision shall be final, and no additional
money shall be due the Contractor based on the final decision. The Contractor
shall not assume that overtime work will be allowed.
D. If weekend work is required or agreed to by the Engineer, the Contractor shall
work the specified weekend (6 hour minimum workday), unless work is prevented
due to bad weather. Should the Contractor choose not to work the specified
weekend due to reasons other than bad weather, then the Engineer may not allow
the Contractor to work the following weekend. This restriction will not be
grounds for delay, additional costs, or changes in work. The Contractor shall not
assume that weekend work will be approved.
Should bad weather prevent the Contractor from working the specified weekend,
then the Contractor may work the following weekend, provided that a proper
request is made by the Contractor and the Engineer approves the request, as
specified.
3.5 ACCESS TO THE PROJECT SITES
The work under this Contract will be in easement areas along creeks, easement
areas in yards, in residential roads and parking lots, and/or in major
thoroughfares. The Contractor shall be solely responsible for accessing the
sewers and manholes to perform the work, including determining access
requirements and developing alternate access points as required, removing and
replacing to equal conditions moveable obstacles (such as fences), clearing and
mowing right-of-ways as required, negotiating with property owners, and
restoring all areas disturbed by the work to equal or exceed preconstruction
conditions (including repairing ruts, seeding and mulching, replacing moveable
objects, etc.). The Contractor is advised that the easement areas will change
throughout the year, and the condition of the easements may be different when the
work commences compared to the conditions at the time of bidding. Easement
areas will become wet during rainy periods and may become overgrown with
brush and vegetation during typical growing periods.
Access shall be along the existing sewer easements or within the existing road
rights-of-way and work shall be maintained within the easements and rights-of-
way unless otherwise approved by the individual property owners and/or the
Owner. The Contractor shall be responsible for negotiating with property owners
for such alternate access and shall pay any and all costs associated with such
alternate access as specified above. All such negotiations with property owners
shall be in writing, and copies of the agreements shall be submitted to the
102
Engine
er prior to using the access. The Contractor shall perform preconstruction
videoing and photographing prior to any work, including accessing the sewers, as
specified further herein.
The Contractor shall submit his/her proposed plan for accessing the sewers and
manholes to the Owner for review and approval. The proposed plan shall be
detailed and shall define each access point. The Contractor shall modify the plan
as required by the Owner.
The costs for accessing the sewer shall be included in the various unit prices bid.
No separate payment will be made for accessing the sewers and manholes.
3.6 TRAFFIC CONTROL
The Contractor shall submit to the Owner a detailed traffic control plan for
performing all phases of the work at least two weeks prior to performing the work
in residential roads and t hree weeks prior to working in major thoroughfares . The
traffic control plan shall be specific to each road and each sewer and manhole and
shall adhere to the requirements of SCDOT ’s "Manual on Uniform Traffic
Control Devices" (MUTCD). The traffic control plans must be approved and the
encroachment permit issued by the City/County and/or SCDOT prior to
performing any work on the roads. The traffic control plan shall be modified as
necessary in the field , at no additional cost, to accommodate unforeseen traffic
control issues and problems and safety concerns as identified by the Contractor,
Owner, other City personnel and/or the SCDOT.
The Contractor shall perform and provide all necessary traffic control measures to
complete the work. No roads shall be closed for construction activities unless
specifically approved in writing by the Engineer. At least one lane of traffic shall
be safely maintained at all times wh ile work is in progress. Access to businesses
and residences along the roads shall be maintained at all times. All lanes shall be
open when work is suspended for one hour or longer. Signs and barricades must
be removed from the site when work is no longer being performed, even during
short breaks in the work (such as lunch breaks).
The Contractor shall provide all appropriate signage and barricades and shall
provide flag persons at all times and places necessary. Traffic control will be
strictly enforced in order to provide fire and police protection to the area and
access to drives while construction is in progress. Occupants must be notified a
minimum of two (2) hours in advance of private drive closings. Closure time will
be limited to a maximum of 2 hours. Where businesses have only one means of
access, the Contractor shall provide an alternative means of access or perform
work during hours when the business is closed.
103
Traffi
c control is a mandatory subsidiary obligation under the Contract, and all
costs of traffic control shall be included in the various unit prices bid – no
separate payment will be made for any traffic control requirements.
3.7 MAINTENANCE OF FLOW IN EXISTING SEWERS
The Contractor is responsible for handling and accommodating all existing
wastewater flows during the work. The Contractor will be required to submit, for
approval by the Engineer, a detailed plan of the method the Contractor proposes
in order to maintain the existing flow during construction.
If bypass pumping is proposed, the plan must include a provision for handling the
existing peak flow by pumping. When pumping is used, an identical standby
pump(s) shall be on site in the event of failure of the primary pump(s). Pumps 4”
and smaller may use flexible piping. Pumps 6” and larger must use rigid piping.
All discharge piping must be continuously monitored for leaks. If any problems
arise with handling the flow with the available pumps or with the discharge
piping, the plugs in the sewers shall be immediately removed, the flow shall be
returned to gravity flow, and the work shall cease until repairs/modifications are
made. No overnight pumping shall be allowed – temporary tie-ins at th e end of
the work day or work week shall be made as necessary.
Sewer system overflows will not be tolerated. All fines imposed on the Owner
associated with overflows caused by the Contractor’s work shall be paid by the
Contractor. Sewer overflows may lead to immediate termination of the Contract.
Maintaining the flow while performing the work is a mandatory subsidiary
obligation under the Contract, and all costs shall be included in the various unit
prices bid – no separate payment will be made.
3.8 WATER SUPPLY
It shall be the Contractor's responsibility to purchase and convey the necessary
water to any location at which it is required on the Project. Water can be
purchased from the Greenville Water Systems (GWS). The Contractor shall
meet with GWS to obtain approval/permits to use GWS’s hydrants for this
Project. The Contractor is responsible for meeting all of GWS’s requirements,
obtaining all permits and paying for all water used. The Contractor shall follow
all GWS procedures for connecting to hydrants and shall be responsible for any
damage caused by improper operation of hydrants. The Contractor is responsible
for meeting all requirements whether listed herein or not. Every truck connecting
to hydrants must have an air gap or backflow prevention device.
The Contractor shall obtain a letter from GWS stating that the Contractor and any
Subcontractors are authorized to connect to hydrants for water usage during this
104
Pro
ject. A copy of this letter shall be submitted to the Owner. Upon completion
of the Contract and prior to final payment, the Contractor shall obtain a letter
from GWS stating that all water has been paid for and shall submit a copy of this
final payment letter to the Owner.
3.9 DISPOSAL OF DEBRIS
The Contractor shall be responsible for disposal of all unused or unsuitable trench
material excavated or encountered in the work that is not used for completion of
the work.
The Contractor shall also be responsible for disposal of all debris removed from
the sewers during cleaning operations. A dump site is not being provided by the
Owner. However, the Renewable Water Resources (ReWa) in Greenville, SC has
previously made their sludge drying beds at their Mauldin Road WRRF facility
available for dumping material from sewer cleaning. If approved by ReWa, the
Contractor shall meet all of ReWa’s requirements for utilizing their drying beds.
3.10 SHOP DRAWINGS
Shop drawings are required for all materials proposed for installation under this
Contract. The Contractor shall submit complete shop drawings for all materials
proposed for each bid item within 30 days from the Notice to Proceed. The
Engineer will review the shop drawings and provide comments to the Contractor
within 14 days of receipt of the shop drawings.
3.11 PRE-CONSTRUCTION VIDEO INSPECTIONS AND PHOTOGRAPHY
The Contractor shall video and photograph all project/work areas (street and off-
road areas) prior to performing any work, including accessing the
manholes/sewers, to document pre-work conditions in case future complaints
arise. The inspections shall be narrated to document locations and dates of video
inspections. The photographs shall be date stamped. One digital copy of the
photographs and videos shall be submitted to the Owner prior to starting any
work. This is a mandatory requirement under this Contract and the costs
associated with this work shall be included in the various unit prices bid – no
separate payment will be made.
The purpose of the inspections and photographs shall be to document the pre-
construction conditions for comparison with the final restoration work. If the
videos/photographs are not complete and not comprehensive to cover all of a
work area, the Contractor will be responsible for addressing all complaints that
appear to be (or could possibly be) the result of his work, in any manner necessary
to completely resolve the complaint, at no additional cost to the Owner.
105
3.12 COOR
DINATION OF CONTRACTORS
The City may have additional contractors in the project areas during this contract.
These other contracts may pre -date or post -date this contract. The work being
performed under these other contracts may include other sewer rehabilitation
work or other City work (sidewalks, roads, parks, etc.). The contractor shall
coordinate his work with any other City contractor working in the area. No
additional payment will be made for this required coordination.
3.13 WORK WITHIN THE SOUTH CAROLINA DEPARTMENT OF
TRANSPORTATION (SCDOT) RIGHT-OF-WAY
An encroachment agreement (or similar agreement) will be required when work
occurs within the South Carolina Department of Transportation ( SCDOT) right-
of-way. In such case, the City will obtain the encroachment permit. The
Contractor shall provide work plans/details and traffic control plans as necessary
and required to obtain the encroachment permit. The Contractor shall perform all
work within the SCDOT right-of-way in substantially the manner outlined in the
encroachments issued by them and keep a copy of same at the construction site at
all times. The Contractor shall hold all certifications required by the SCDOT for
working in their road right-of-way, including traffic control, excavation, etc.
The Contractor will notify the City twenty -four (24) hours prior to commencing
any construction within the SCDOT ’s right -of-way. The SCDOT may require
restricted working hours or weekend work as specified elsewhere herein. SCDOT
may also require backfilling trenches with ABC stone or flowable fill (to be paid
at the unit prices bid).
As always, the Contractor shall be required to maintain all traffic, furnish all
barricades and flashers, flagmen and pilot cars when necessary. Refer to the
TRAFFIC CONTROL section of these Special Provisions for additional
requirements.
The Engineer and/or Owner will identify SCDOT roads as the work progresses.
3.14 MAP CONFIRMATION AND UPDATES
At the start of the project, the Contractor shall walk the sewers to be cleaned and
televised to locate manholes and identify additional manholes not shown on the
drawings. The Contractor shall note any added manholes and notify the
Owner/Engineer so manhole numbers can be assigned prior to starting the TV
inspections. In general, additional manholes that are found during the inspections
shall be numbered as the downstream manhole number followed by a “ A”. The
Contractor shall also update the drawings to show any changes based on the
106
actual
sewer layout. These “red -line” markups shall be submitted to the
Owner/Engineer along with the TV inspections.
3.15 SURVEYING REQUIREMENTS
The Contractor is responsible for performing all surveying required for
completion of this Project and the various work items included in the Bid. The
costs for all surveying shall be included in the various unit prices bid – no
separate payment shall be made.
For sewer replacements from manhole to manhole, the Contractor shall survey the
sewers at each manhole (sewer in and out at each manhole) for the extent of the
replacement work to identify the existing sewer slopes and any elevation changes
through the existing manholes. The Contractor shall also survey the next
upstream and downstream manholes so that a comprehensive decision can be
made on the extent of the required replacement work. The survey information
shall be submitted to the Engineer for review and determination of the slope for
the new sewer(s). The survey shall be completed and subm itted at least two
weeks in advance of the replacement work to provide adequate review time for
the Engineer.
3.16 SOIL AND EROSION CONTROL
The Contractor shall protect against soil erosion into nearby streams and storm
drains at all times. Minimum erosion control requirements shall be as shown on
the Drawings (where applicable). The Contractor shall install silt fence along the
downstream side of all construction activities and provide inlet protection around
all catch basins/storm inlets whether shown on the Drawings or not. Any water
removed from excavations during dewatering shall be filtered to remove
sediments before being discharged to the creek or the sanitary sewer system
(when approved by the Engineer). The Contractor shall add additional erosion
control devices throughout construction as deemed necessary and as required by
the Owner, Engineer or regulatory agencies.
The erosion control devices shall be installed prior to performing any work
including clearing and shall be maintained throughout construction. Construction
entrances shall be provided at all off-road work sites. All erosion control devices
shall be checked continuously and immediately after rain events. Repairs to
erosion control devices shall be made immediately when identified. Silt fences
shall remain functional until all restoration has been performed and the restoration
is accepted by the Engineer/Owner. An adequate stand of grass will be required
prior to removing silt fences. The Contractor shall remove all erosion control
devices upon completion of the work and completely restore disturbed areas.
Contractor shall obtain the Engineer’s approval prior to removing erosion control
devices.
107
As pa
rt of the soil and erosion control measures, where practicable, trenches
should be filled, covered and temporary seeding applied at the end of each day.
Stabilization measures shall be initiated as soon as practicable, but in no case
more than 14 days after work has ceased in that area.
3.17 COORDINATION WITH EXISTING UTILITIES
The Contractor shall contact 811 to locate existing utilities in the area prior to
performing any excavation. The Contractor shall locate existing utilities and
facilities not located by the locating company. The Contractor shall closely
coordinate with utility companies including Duke Power, Piedmont Natural Gas,
Greenville Water Systems, City/County, cable TV, phone companies and others.
The Contractor shall be responsible for protecting all existing utilities during the
work and shall repair any damage to the satisfaction of the utility owner. If the
utility company fixes the damage, the Contractor shall pay for the repair if
required.
Some existing utilities may be shown on the Drawings. The locations shown shall
be considered approximate only. Most (or all) of the existing utilities may not be
shown. The Contractor shall determine actual locations of all utilities within the
construction area. The Contractor is advised that the project areas may be
congested with existing utilities, and existing utilities will cross sewer trenches and
run parallel with sewer trenches. The Contractor shall accommodate and protect all
existing utilities regardless of location and shall be responsible for repairing all
damage to the utilities – no separate or additional payment shall be made for
accommodating and protecting existing utilities.
3.18 UTILITY POLES
The Contractor shall note that the work may be located near existing utility pole
and guy wires. The Contractor shall make all necessary arrangements with the
various utilities to protect the poles and guy wires and make any necessary
relocations of same if field conditions require, as determined by the Engineer and
the utility owners, and at no additional cost to the Owner.
3.19 TRENCH BACKFILL
A. Backfill of the trench shall be accomplished immediately after the pipe has been
installed. No more than fifty (50) feet of trench shall be opened at any given
period of time. Backfill of the trench shall commence immediately following pipe
installation. This will be enforced in order to minimize the amount of open
trench. Backfill and compaction activities will be on-going operations.
108
B. The C
ontractor shall backfill around the pipe to an elevation of one (1) foot above
the pipe bell by hand only. Remaining backfill and compaction shall be as
specified. All excavations will be completely backfilled by the end of each
workday.
3.20 TRENCH EXCAVATION
A. The Contractor will be required to provide a trench box or sheeting and shoring in
accordance with OSHA regulations. The Contractor will not be allowed by the
Engineer to slope trench walls. The Contractor will be required to sheet, shore,
and work from within a shoring box, etc., and do all that is necessary to maintain
minimal trench widths and still meet OSHA requirements for this construction.
No trenches shall be left open overnight. Any additional cost shall be included in
the various pay items in the Bid. The Contractor will submit shoring details,
when requested by the Engineer, for review and approval by the Controlling
Agency. The Contractor is advised that existing utilities will cross and run
parallel to sewer trenches, so the sheeting/shoring plan must accommodate any
and all existing utilities.
3.21 SHORING AND SHIELDING
A. The Contractor shall comply with OSHA trenching and excavation regulations as
revised in Subpart P of Part 1926 in the Federal Register. Shoring and/or
shielding systems shall be used as specified in Subpart P to prevent caving of
trench banks and to provide a safe excavation. These requirements will also apply
to bore pits and/or tunnels.
B. The Contractor will be responsible for excavation safety and shall designate his
“competent person” (as defined in Subpart P) for the determination of proper
shielding/shoring systems.
C. If, in the opinion of the Engineer, the trench/excavation is not in compliance with
OSHA regulations, the Contractor may be directed to stop work. Continued
unsafe conditions will be reported to the appropriate regulatory agency. The
Contractor will be responsible for paying all fines resulting from safety violations.
3.22 RESTORATION
The Contractor shall be responsible for restoring all areas affected by the work to
equal or exceed pre -construction conditions. All restoration work shall be
performed in accordance with the standards and specifications.
Restoration work shall be performed daily to restore areas disturbed during that
day including pavement. If requested by the Contractor, the Engineer may allow
the Contractor to perform the restoration work one day per week (at the end of the
109
wor
k week). However, if complaints are recei ved from the City, State, or
residents, the Engineer will require that daily restoration be performed.
3.23 RESTORATION OF GRASSED AREAS
The Contractor shall be responsible for restoring all grassed areas affected by the
work to equal or exceed pre-construction conditions. Restoration of grassed areas
shall be performed at the end of each day unless otherwise approved by the
Engineer. The costs for restoring grassed areas via seeding and mulching
including all requirements specified below shall be included in the various bid
items - no separate payment will be made. Payment will not be made for the
various work items until the restoration is complete and satisfactory to the
Engineer unless otherwise approved by the Engineer. The Engineer will consider
in such a decision whether the Contractor is using the subject areas for accessing
the upstream work in which case the area cannot be restored. Final payment will
not be made until all areas are completely restored to the satisfaction of the
Engineer and property owner. Refer to the Drawings for additional requirements.
The Contractor or his subcontractor performing excavation work in grassed areas
shall initially be considered acceptable to perform the restoration work. However,
if the Contractor’s work is not satisfactory to the Engineer, Owner or property
owner(s), the Contractor shall hire a local, professional landscaping company to
perform the work at no additional cost to the Owner. The Contractor should
consider retaining a local landscaping company during the 1-year warranty period
to handle all complaints and warranty issues.
All grassed areas disturbed by the work under this Contract may be either seeded
and mulched or sodded. The Engineer/Owner must agree with the choice of
restoration recommended by the Contractor prior to any grassing being done
(some areas on the Drawings may be designated to have specific type or method
of grassing at that location). The seeding or sodding work shall be performed as
follows:
Seeding and Mulching: The grass variety/species shall match the existing
grass and shall be new seed and free of weeds and contamination. The
Contractor shall submit the proposed seed mix along with the seed
manufacturer’s recommendations for lime, fertilizing, planting, watering,
and maintaining. All such recommendations shall be strictly followed.
For easement areas through the woods, where little or no grass may exist,
the Contractor shall plant a mixture of fescue and rye. The mixture rate
including fertilizer shall be as follows or as recommended by local
nurseries for fescue/rye in easement areas (all rates below are in pounds
per 1000 square feet):
110
5 lbs K
entucky Fescue No. 31
3 lbs Rye Grain
(sometimes approved to add millet)
20 lbs Fertilizer (5-10-10)
100 lbs Lime
12 lbs Superphosphate
For all seeding work, the Contractor shall provide clean, finely graded
topsoil for the top 4 inches. The Contractor may strip the top 4 inches of
soil prior to excavation and stockpile this topsoil in a separate pile for use
if the existing soil is suitable. If the existing soil is not suitable, the
Contractor shall import approved, clean topsoil for use. The cost for
providing and importing all necessary topsoil shall be included in the
various unit prices bid – no separate payment shall be made.
Prior to any planting, the Contractor shall grade all easement areas (non-
yard areas) smooth as approved by the Engineer/Owner in the field. The
Owner must be able to drive heavy sewer maintenance equipment along
the sewer route to access every manhole unless otherwise approved. In
addition, slopes of easements shall be such that the Owner can mow the
easements with bush-hog equipment. There shall be no ruts or wash-out
areas in the easements and no exposed rock or debris. The Contractor
shall install culvert pipes or large stone (such as SCDOT No. 3 surge stone
or rip-rap where approved) for draining easement areas as necessary and
as required by the Engineer/Owner. All exposed tree roots shall be cut, all
trees completely removed or stumps ground to 12 inches below grade
(where approved by the Owner), and all damaged tree limbs cut and
removed. The final grading of all easement areas must be approved by the
Engineer/Owner prior to planting any grass. The top 4 inches of soil shall
be clean, fine graded topsoil, either stripped and stockpiled or imported.
For yard/lawn areas, the Contractor shall grade areas to be a smooth, even
surface with loose, fine textured soil. The area shall be rolled and raked.
High spots shall be removed, and low spots shall be filled with suitable
topsoil to meet finish grades. As specified above, the top 4 inches of soil
shall be clean, fine graded topsoil, either stripped and stockpiled or
imported.
Fine grading should be limited to areas which can be planted in the
immediate future. After fine grading and prior to planting, restore
prepared areas to the above specified condition if eroded or otherwise
disturbed. Prepared areas shall be moistened before planting lawn.
The Contractor shall lime and fertilize the soil prior to planting as
recommended by the seed manufacturer, spread seed at the recommended
111
rates
, mulch area with clean wheat straw, and water area immediately after
planting as recommended. It is recommended that the Contractor take soil
samples so that proper lime and fertilizer rates can be determined.
Contractor shall maintain the planted area for at least 30 days and until
completely established. Maintenance shall include watering per the seed
manufacturer’s recommendations (at least 1 inch of water per week
including rain), re-fertilizing as recommended and required, and cutting
the grass to continue healthy growth as required. Contractor to submit
watering and maintenance schedule to Engineer. Water used shall be
provided by the Contractor. Property owners shall not be involved in
watering operations unless the property owner requests that they be
allowed to water the grass, and the Engineer approves.
Grassed areas will be acceptable provided requirements, including
maintenance, have been complied with, and a healthy, well rooted, even
colored, viable grass is established that is free of weeds, bare areas, and
surface irregularities, to the satisfaction of the Engineer/Owner and
property owner. All bare areas shall be re-seeded and maintained until
accepted by the property owner and approved by the Engineer/Owner.
Sod Restoration: At the Contractor’s option and in specific areas identified
by the Engineer/Owner, the grassed areas disturbed by the work may/shall
be sodded. When sod restoration is selected or required, the Contractor
shall provide new sod. The Contractor shall match exactly the species of
the existing grass including providing strongly rooted (2" minimum thick
root mat), certified sod, not less than 2 years old and free of weeds and
undesirable native grasses. Sod must be capable of growth when planted.
As specified above for seeding and mulching, the top 4 inches of soil shall
be clean, fine graded topsoil, either stripped and stockpiled or imported.
The Contractor shall grade lawn areas to a smooth, even surface with
loose, uniformly fine texture, roll and rake, remove ridges and fill
depressions to meet finish grades, add suitable topsoil to any portion or the
entire area which does not meet finished grades, limit fine grading to areas
which can be planted in the immediate future, moisten prepared lawn areas
before planting lawn, and restore prepared areas to specified condition if
eroded or otherwise disturbed, after fine grading prior to planting.
The Contractor shall lay sod within 24 hours from time of stripping. The
sod shall be laid to form a solid mass with tightly fitted joints with ends
and sides of sod strips butted, not overlapped. Strips shall be staggered to
offset joints in adjacent courses. Work shall be performed from boards to
avoid damage to subgrade or sod. The sod shall be tamped or rolled lightly
112
to ens
ure contact with subgrade. The Contractor shall work sifted soil into
minor cracks between pieces of sod, remove excess to avoid smothering
adjacent grass and water sod with fine spray immediately after planting so
that entire sod blocks are moist but not soggy.
Begin maintenance of lawns immediately after planting and continue for at
least 30 days and until completely established. Maintain lawn by watering
and other operations such as rolling, regrading and replanting as required
to establish a smooth, acceptable lawn, free of eroded or bare areas.
Watering schedule shall be as recommended for that type of sod by local
nurseries and shall be at least 1 inch of water per week including rainfall.
Contractor to submit watering schedule to Engineer. Water used shall be
provided by the Contractor – property owner(s) shall not be involved in
watering operations unless requested by the property owner(s) and
approved by the Engineer. Contractor shall also lime and fertilize as
recommended by local nurseries.
Sodded lawns will be acceptable provided requirements, including
maintenance, have been complied with, and healthy, well rooted, even
colored, viable lawn is established, free of weeds, open joints, bare areas,
and surface irregularities, to the satisfaction of the Engineer and property
owner. All bare areas shall be re-sodded.
3.24 RESTORATION OF PAVED AREAS
Pavement restoration shall be in accordance with the Drawings, Specifications
and SCDOT standards. All materials shall meet SCDOT standards. All
installation shall be in accordance with SCDOT standards. Bid items are
provided for asphalt restoration in accordance with the various Standard Details.
For asphalt restoration, payment shall be limited to a width equal to the maximum
trench width (as defined in the specifications and/or details) plus 5 feet and to a
length equal to the length of the required work plus 6 feet. The Contractor shall
not be paid for any restoration outside of these limits unless specifically approved
by the Engineer prior to the specific work. For concrete restoration, sod
restoration and gravel restoration, the Engineer shall define the limits prior to
starting the required work.
The Contractor is advised that the asphalt pavement may be underlain by 12
inches or more of concrete that must be cut through and replaced whenever
excavation is performed. The location and extent of such concrete underlayment
is not known but has been previously found under SCDOT roads. B id items are
included for removal and disposal of pavement (asphalt and concrete) 6 inches
and thicker. The cost to remove asphalt and concrete that is less than 6 inches
113
thic
k shall be considered incidental to the work and all costs shall be included in
the various unit prices bid.
All unit prices bid shall include adjusting manhole frames/covers and
appurtenances on all other existing utilities (such as water valve boxes) to final
asphalt elevations (after milling and overlay).
3.25 FENCE REPLACEMENT
Existing fences that are disturbed during construction shall be repaired or replaced
to a condition equal to or better than the origina l unless a release is obtained from
the property owner and submitted to the Engineer. All fences shall be replaced
immediately after construction has cleared the fence line. The costs to remove
and replace the existing fences shall be considered incidental to the work and
shall be included in the various unit prices bid. If the existing fence is not
salvageable and a new section required, as agreed to by the Engineer prior to any
work in the area and prior to removing the existing fence, a price shall be
negotiated and payment made from the contingency item, as approved and
directed by the Engineer. If the Contractor does not obtain the Engineer’s
approval for new fence material prior to removing the existing fence, the
Contractor will be responsible for installing the new fence at no cost to the
Owner.
3.26 MAILBOX/STREET SIGN REPLACEMENT
The Contractor, along with the Owner’s and/or Engineer’s representative(s) , will
measure all mailboxes and street signs horizontally from edge of pavement and
vertically from finish ground prior to removal. The Contractor and the Owner’s
and/or Engineer’s representative(s) will log these measurements at each location
to ensure proper replacement. Street signs shall be replaced immediately after
construction at that location. Mailboxes shall be replaced by the end of the
business day or no more than 2 hours after removal. The cost of this work shall
be included in the various bid items – no separate payment will be made.
3.27 EQUIPMENT IDENTIFICATION SIGNS
All motorized construction equipment, trucks, vehicles, and storage trailers, etc.
used (owned, leased, rented or borrowed) by the Contractor on this project shall
be equipped with a pair of signs to identify the Contractor . The signs shall be
permanently or magnetically attached to each side of the equipment at all times.
3.28 TREE PROTECTION
All trees located in the road right-of- way and along the sewer easements shall be
protected from damage by this construction. Barriers shall be installed around
each tree to remain. The barrier shall be a suitable temporary fence and shall be
114
insta
lled around the drip line of the tree (around the outside of the overhanging
tree limbs) unless otherwise approved by the Engineer. No equipment,
construction materials, topsoil, fill dirt or any other material shall be placed within
the barrier. Nothing shall be nailed or attached to the tree.
Any trees that are damaged shall be repaired as approved by the Engineer. An
Arborist, paid for by the Contractor, may be required to recommend repair of
severely damaged trees. Recommendations by the Arborist shall be strictly
followed. Severely damaged trees may require replacement with a like-kind tree.
Any tree that dies (including during the warranty period) as a result of the work
shall be replaced with a like-kind tree including size to the extent possible. Tree
replacement shall be approved by and acceptable to the property owner and
Engineer.
3.29 CLEANUP WORK
The Contractor shall completely clean up the work site at the end of each day.
The cleanup work shall include washing streets with high pressure water,
removing debris, and removing stockpiled materials and equipment from the site
as necessary. If request ed by the Contractor, the Engineer may allow the
Contractor to perform the cleaning operations one day per week (at the end of the
work week). However, if complaints are received from the City, State, or
residents, the Engineer will require that daily cleanup be implemented.
3.30 ACCEPTANCE TESTING
A. Acceptance testing shall be required for all work performed under this Contract.
The costs for all acceptance testing shall be included in the unit prices bid for the
various work items – no separate payment will be made.
B. The Contractor shall televise all completed point repair work and new sewer
installations to confirm that the installed work meets these Contract Documents.
The television inspections shall comply with Section 02650 Sewer Cleaning and
Television Inspection. The Contractor will not be paid for the point repair or new
sewer until the television inspections are completed and submitted to and
approved by the Engineer. The Contractor shall promptly repair any defects
identified from the television inspections and re -televise the completed work.
Future Pay Estimates may be withheld by the Owner until such defects are
repaired. The new pipes (from point repairs and new sewer installations) shall be
on a constant grade and alignment from end to end and connections to the existing
pipes shall match without offsets, open joints, or leaks. The cost of the television
inspections for acceptance shall be included in the cost bid – no separate payment
will be made.
115
C. The
Contractor shall air test all new sewers installed from manhole to manhole
(that have no service lateral connections) in accordance with the standard
specifications, ASTM F1417-11a for PVC sewers, and ASTM C969 for ductile
iron sewers. Payment will not be made until the air testing is completed and
approved.
D. The Contractor shall perform mandrel testing on all new PVC sewers installed
from manhole to manhole in accordance with the standard specifications.
Payment will not be made until the mandrel testing is completed and approved.
E. The Contractor shall vacuum test all new manholes and rehabilitated manholes
(those coated with cementitious mortar) in accordance with the standard
specifications and ASTM C1244, except the minimum test time shall be 1 minute.
Payment will not be made until the vacuum testing is completed and approved.
F. Also refer to Section 02766 and 02767 – Cured-In-Place Pipe Lining (CIPP) for
further testing requirements.
3.31 FINAL INSPECTION
A. As work is completed, the Engineer will perform an inspection of the work,
including review of post -rehab video inspections, and generate a punchlist of
defects, deficiencies and issues for the Contractor to address. Any deficiencies
found shall be corrected by the Contractor promptly (within 14 calendar days
maximum). Failure to correct deficiencies promptly may result in payment being
withheld. The Engineer will not allow punchlist items to build up before repairs
are made.
B. After all work is completed (including all restoration an d testing), the Engineer
will perform a final inspection of all work in all work areas . The Contractor shall
notify the Engineer in writing when the work is complete and ready for final
inspection. The final inspection will not be performed if any portion of the work
is obviously not complete. A punchlist will be developed by the Engineer to
identify defects, deficiencies and issues found during the final inspection that
must be repaired by the Contractor prior to final payment. After the Contractor
addresses the punchlist to the satisfaction of the Engineer, the final pay estimate
for the project can be submitted by the Contractor for payment.
3.32 HANDLING AND STORAGE OF MATERIALS
A. The Contractor shall be responsible for the safe storage of materials furnished by
or to him, and accepted by him and intended for the work, until they have been
incorporated in the completed project. The interior of all pipes, manholes and
other accessories shall be kept free from dirt and foreign materials at all times.
116
B. The C
ontractor and his Suppliers are directed to contact the State Department of
Transportation to verify axle load limits on State maintained roads (and bridges)
which would be used for hauling of equipment and materials for this project. The
Contractor and his Suppliers shall do all that is necessary to satisfy the
Department of Transportation requirements and will be responsible for any
damage to said roads which may be attributed to this project.
C. All materials required to construct this project shall be furnished by the
Contractor and shall be delivered and distributed at the site by the Contractor or
his material supplier.
D. Ductile iron pipe and cast iron accessories shall be lo aded and unloaded by lifting
with hoists or skidding so as to avoid shock or damage. PVC pipe and precast
manholes will be unloaded with hoists and/or as recommended by the respective
manufacturers. Under no circumstances shall such materials be dropped. Pipe
handled on skidways shall not be skidded or rolled against pipe already on the
ground.
E. In distributing the material at the site of the work, each piece shall be unloaded
opposite or near the place where it is to be laid in the trench. Each piece shall be
redundantly chocked at each end to prevent movement or rolling. Pedestrian or
vehicular traffic shall not be unduly inconvenienced in placing of material along
the streets or right-of-way, as applicable.
F. The Contractor will string in advance no more than the amount of pipe and
material that can be installed within two (2) weeks unless approved by the
Engineer. All the materials shall be placed in such a manner as not to hinder
access, endanger or impede traffic, create a public nuisance or en danger the
public. Materials strung through residential areas (or any area with maintained
lawns) shall be placed in such a manner as not to restrict normal lawn
maintenance, and must either be installed within two (2) weeks or removed to an
approved storage yard, as required by the Engineer.
G. Storage sites shall be fenced with adequate protection to reasonably prevent
people from entering the site. The Contractor shall be responsible for the
safeguarding of materials and equipment against fire, theft, and vandalism and in
a manner which does not place the public at risk, and shall not hold the City
responsible in any way for the occurrence of same.
H. Precast manholes, pipe and fittings, including rings and covers, steps, straps, etc.,
shall be so handled that the coating or lining will not be damaged. If, however,
any part of the coating or lining is damaged, the repair shall be made by the
Contractor at his expense in a manner satisfactory to the Engineer.
117
3.33 RE
CORD DRAWINGS
A. The Contractor shall document all work performed and sewers and manholes
installed by marking the drawings in red ink to reflect the final, installed work.
All changes in sewer and manhole locations, layouts and elevations shall be
documented along with the locations for new service laterals.
B. Record Drawings shall be submitted at the end of the project and are a
requirement prior to final payment.
3.34 PAY ESTIMATES
A. Pay estimate forms will be provided to the Contractor. The Contractor will
provide the following documents with each payment request:
1. Signed Estimate Form.
2. Schedule of values showing work completed.
3. Survey of new sewers installed.
4. Acceptance testing as specified.
B. Contract Closeout Documents: The Contractor will provide the fol lowing
documents with the final payment request:
1. Consent of Surety to Final Payment.
2. Contractor's affidavit - Release and Waiver of Claim.
3. Signed estimate form.
4. Record Drawings.
C. Final payment will not be authorized until these documents have been properly
completed and submitted by the Contractor, and all deficiencies noted at the final
inspection have been corrected and approved.
D. No payment will be made for stored materials.
3.35 INCLEMENT WEATHER
Work shall not be performed when weather creates work site conditions that are
unsafe for workmen or for the general public, or prevent performance of the
contract provisions. Inclement weather conditions shall be defined as weather
extremes (daily rainfall exceeding 0.25”) which exceed the anticipated inclement
weather days indicated below:
Month Anticipated Inclement Weather Days
January 7
February 6
118
March
7
April 5
May 6
June 5
July 6
August 7
September 4
October 4
November 6
December 6
Partial months at the beginning and end of the contract period will be prorated
proportionally. Inclement weather occurring on holidays, Saturdays or Sundays are
included in the anticipated inclement weather days above. The Contractor shall
take into consideration these monthly anticipated inclement weather days when
submitting his bid, and therefore these calendar days are included in the Contract
time.
The Contractor and Owner’s/Engineer’s representative will agree on any days in
which the rainfall exceeded 0.25” at the project site. The Contractor may consider
installing a rain gauge to measure and document the rainfall. The Contractor shall
submit a report to the Engineer monthly, indicating daily rainfall amounts and the
dates when rainfall at the site exceeded 0.25”. The Engineer will compare the
actual inclement weather days to the anticipated inclement weather days on a
monthly basis. At the end of each calendar quarter, the Engineer will submit a
report to the Contractor, indicating any adjustment in the Contract period for
inclement weather days. Adjustments to the Contract period will be based on a
comparison for the entire calendar quarter.
The Engineer will consider special conditions caused by inclement weather or by
continuing adverse weather patterns on a case-by-case basis. Such requests must
be submitted in writing to the Engineer within seven (7) calendar days of the
occurrence(s) and must be fully documented with the cause and the effect of the
occurrence(s) on critical path activities. Within 30 calendar days of receipt of a
request from the Contractor, the Engineer will submit a report to the Contractor,
indicating any adjustment in the Contract period.
The Contractor’s sole remedy for delays covered by this provision shall be an
extension of the contract time only.
3.36 ADJACENT STRUCTURES AND LANDSCAPING
The Contractor shall be entirely responsible and liable for all damage or injury as
a result of his operations to all public and private property, structures of any kind,
and appurtenances thereto during the progress of the work. The cost of
119
prote
ction, replacement in the original location and condition, and payment of
damages for injuries shall be included in the various bid items, and no separate
payments will be made.
The Contractor is advised that the protection of buildings, structures, tunnels,
tanks, pipelines, etc. and related work adjacent to and in the vicinity of his
operations, is solely his responsibility. Conditional inspection of buildings or
structures in the immediate vicinity of the project which may reasonably be
expected to be affected by the work shall be performed by and shall be the
responsibility of the Contractor.
The Contractor shall, before starting operations, make an examination of the
interior and exterior of the adjacent structures, buildings, facilities, etc., and
record by notes, measurements, photographs, etc., conditions which might be
aggravated by his operations. Repairs to or replacement of all damage reasonably
attributed to or caused by the construction shall be made to the satisfaction of the
affected property owner, the Owner and the Engineer. This does not preclude
conforming to the requirements of the insurance underwriters. Copies of surveys,
photographs, reports, etc., shall be given to the Engineer.
Prior to the beginning of any excavations or other work, the Contractor shall
advise the Engineer of all buildings or structures the project work will affect and
any pre-existing conditions that need to be brought to the attention of the
Engineer.
Lawn areas shall be left in as good or better condition as before the starting of the
work. Where sod is to be removed, it shall be carefully removed, maintained, and
later replaced, or the area where sod has been removed shall be restored with new
sod in the manner described in these Specifications. All restoration shall be as
specified in these Specifications. The final grade shall match the pre-existing
grade as closely as possible unless noted otherwise.
Any fence, or part thereof, that is damaged or removed during the course of the
work shall be replaced or repaired by the Contractor and shall be left in as good or
better condition as before the starting of the work. The manner in which the fence
is repaired or replaced and the materials used in such work shall be subject to the
approval of the property owner and the Engineer. The cost of all labor, materials,
equipment, and work for the replacement or repair of any fence shall be deemed
included in the appropriate bid item.
3.37 NOISE CONTROL
The Contractor shall minimize noise at all times and shall make reasonable efforts
to avoid unnecessary noise. Such measures shall be appropriate for the normal
ambient sound levels in the area during working hours. All construction machinery
120
and vehi
cles shall be equipped with practical sound-muffling devices, and operated
in a manner to cause the least noise consistent with efficient performance of the
Work.
During construction activities on or adjacent to occupied buildings, and when
appropriate, the Contractor shall erect screens or barriers effective in reducing
noise in the building and shall conduct his operations to avoid unnecessary noise
which might interfere with the activities of building occupants. The Contractor
shall strictly observe all local regulations and ordinances covering noise control.
Except in the event of an emergency or where approved or specified by the
Engineer, no work which produces noise shall be done between the hours of 7:00
P.M. and 7:00 A.M., or on Sundays. Dewatering equipment and bypass pumping
equipment operating during these times shall be quiet or silent pumps or electric
motor driven pumps. If the proper and efficient prosecution of specific and limited
work requires operations during the night, the written permission of the Engineer
shall be obtained before starting such items of the work.
3.38 DUST CONTROL
The Contractor shall take sufficient precautions throughout construction to
minimize the amount of dust created. The Contractor shall prevent dust nuisance
from his operations or from traffic by keeping roads and/or construction areas clean
and sprinkled with water. Construction entrances shall be provided as specified in
the standard details.
Buildings or operating facilities which may be affected adversely by dust shall be
adequately protected from dust. Existing or new machinery, motors, instrument
panels, or similar equipment shall be protected by suitable dust screens. Proper
ventilation shall be included with dust screens.
3.39 SMOKE PREVENTION
The Contractor shall not use equipment which routinely produces substantial
visible emissions. Strict compliance with ordinances regulating the production and
emission of smoke will be required. No open fires will be permitted unless
approved by the local authorities and the Engineer.
3.40 STAGING AREAS
The Contractor shall be responsible for locating, negotiating and paying for staging
areas and equipment and material storage areas.
3.41 PARKING
121
The C
ontractor shall provide and maintain suitable parking areas for the use of all
construction workers and others performing work or furnishing services in
connection with the project and as required to avoid any need for parking personal
vehicles where they may interfere with public traffic, the Owner’s operations, or
construction activities.
3.42 CONTRACT MODIFICATION
All changes which affect the cost of the construction of the project must be
authorized by means of a Contract Change Order. All Change Orders and Contract
modifications must be approved by the Owner prior to becoming effective. The
Contract Change Order will include extra work, work for which quantities have
been altered from those shown in the Bid Schedule as well as decrease or increase
in the quantity of the installed units which are different from those shown in the
Bid Schedule because of final measurements. All changes should be recorded on a
Contract Change Order as they occur so that they may be included in the partial
payment estimate.
3.43 PROTECTION OF WORK
The Contractor shall at all times, until final acceptance of the work, provide
protection of the work, either new or previously existing, from all hazards involved
in his operations.
3.44 SECURITY
The Contractor shall be responsible for protection of the site, and all Work,
materials, equipment, and existing facilities thereon, against vandals and other
unauthorized persons. No claim shall be made against the Owner by reason of any
act of any employee or trespasser, and the Contractor shall make good all damage
to the Owner’s property resulting from his failure to provide security measures as
specified. The Contractor shall provide insurance to cover the cost of all labor,
materials and equipment to be supplied under this Contract until the work is
completed, acceptance testing has been performed, and the Owner has accepted the
project and it is ready to be placed in service.
3.45 PUBLICITY
All prime contractors and their subcontractors shall submit to the Owner for
approval all publicity items, including photographs, relating to the work of this
project. The Owner shall approve any and all material prior to release for
publication.
3.46 SPECIAL PRECAUTIONS
122
At a
ll times during the construction of the project and its component parts, the
Contractor shall provide, install and maintain proper temporary supports, shoring
and bracing to prevent any damage to the work due to all causes.
3.47 WARRANTY PERIOD
The Contractor shall warrant all work and materials installed in this Contract for
one (1) year from the date of final acceptance. The date of final acceptance shall
be the date that final payment is made to the Contractor. Prior to final acceptance,
the Cont ractor shall submit a written plan on how warranty issues will be
addressed, including CIPP issues, manhole issues, and restoration issues.
3.48 DRAWINGS AND SPECIFICATIONS
The Drawings and Specifications form a part of this Contract as set forth in
Paragraph 1.1, Document 00700, GENERAL CONDITIONS. The Drawings and
Specifications are as listed in the Contract Agreement.
END OF SECTION
123
SECTION 01140
PROJECT ACCESS AND RESTRICTIONS
PART 1 GENERAL
1.1 RIGHT OF ENTRY
A. The Owner and their representatives shall have access to the work at all times.
Representatives of Federal, State and Local Agencies affected by the work shall be
allowed access to the project site for inspection. Contractor shall provide the proper
facilities for access and inspection of all phases of the work.
1.2 RIGHTS-OF-WAY AND EASEMENTS
A. The project will be constructed within existing public rights -of-way and easements
obtained by the Owner across private properties. The limits of the easements and
rights-of-way are shown on the drawings. Copies of the easements may be obtained
from the Owner.
B. Contractor shall set stakes to mark the easement boundaries across private property.
These stakes shall remain until completion of construction.
C. Contractor shall not encroach upon any private property outside the easement limits
without written permission from the property owner.
D. For work performed within state and county road rights -of-way, encroachment
agreements have been obtained, and copies may be obtained from the Owner.
1.3 WORK HOURS
A. With the exception of emergency repairs, all construction work shall be performed
during the hours of 7:00 A.M. to 6:00 P.M., Monday through Friday. However, no
heavy equipment may be operated prior to 8:00 A.M. or after 5:00 P.M. After hours,
holiday or weekend work, except for emergencies, shall not be performed without
prior permission from the Owner.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION
124
SECTION 01200
PROJECT MEETINGS
PART 1 GENERAL
1.1 PRECONSTRUCTION CONFERENCE
A preconstruction conference will be scheduled by the ENGINEER within 14 days after
issuance of the Notice to Proceed. The Contractor and his major subcontractors shall attend
the meeting, which will be chaired by the ENGINEER or his representative. The purpose of
the pre -construction conference will be to discuss administration of the Contract and the
execution of work, and to answer any questions relative to performance of the work, under
these Contract Documents. All decisions, instructions and interpretations made at this
conference shall be binding and conclusive. The proceedings of this conference will be
recorded and copies of the proceeding minutes will be issued to the Contractor for his use
and distribution to his subcontractors.
1.2 MONTHLY PROGRESS MEETINGS
The Contractor and any subcontractor, material suppliers or vendors whose presence is
necessary or requested shall attend meetings, referred to as Monthly Progress Meetings,
when requested by the ENGINEER or his representative for the purpose of discussing the
execution of work. Each meeting will be held at the time designated by the ENGINEER or
his representative. Each meeting shall be held at the administrative office of the Owner,
located at 120 Augusta Arbor Way, Greenville, South Carolina. All decisions, instructions
and interpretations given by the ENGINEER or his representative at these meetings shall be
binding and conclusive on the Contractor and such decisions, instructions and
interpretations shall be confirmed in writing by the ENGINEER or his re presentative. The
proceedings of these meetings will be recorded and the Contractor will be furnished with a
reasonable number of copies for his use and for his distribution to the subcontractors,
material suppliers and vendors involved.
END OF SECTION
125
SECTION 01270
MEASUREMENT AND PAYMENT
Bid items have been set up in the Bid Form for all work that is permanent and measurable. The
bid for each pay item shall include the cost of all new material, labor, equipment, and all else
required to complete that pay item as specified. Payment for work will only be made after the
work is complete and has been inspected by the Engineer.
The Bid includes the following abbreviations:
- LF = linear foot
- VF = vertical foot
- EA = each
- CY = cubic yard
- SY = square yard
- ACRE = acre
The Total Bid Price shall cover all work required by the Contract Documents. All costs in
connection with the proper and successful completion of the work, including furnishing all
materials, equipment, supplies, and appurtenances; providing all construction plans, equipment,
and tools; and performing all necessary labor and supervision to fully complete the work, shall
be included in the unit and lump sum prices bid. All work not specifically set forth as a pay item
in the Bid Form shall be considered subsidiary obligations of Contractor and all costs in
connection therewith shall be included in the prices bid.
All estimated quantities stipulated in the Bid Schedule or other Contract Documents are
approximate and are to be used only (a) as a basis for estimating the probable cost of the Work,
and (b) for the purpose of comparing the bids submitted for the Work. The actual amounts of
work done and materials furnished under unit price items may differ from the estimated
quantities. The basis of payment for work and materials will be the actual amount of work done
and materials furnished. Contractor agrees that he will make no claim for damages, anticipated
profits, or otherwise on account of any difference between the amounts of work actually
performed and materials actually furnished and the estimated amounts therefore.
Item 1 - Sewer Cleaning and Television Inspection: This item includes all work and equipment
required to completely clean (remove debris, roots, grease, pipe tuberculation and other material)
and televise existing 8” to 12” sewers to further evaluate the condition of the sewers as specified.
The cleaning and CCTV inspections will be used to identify defects in need of repair and as pre -
CIPP installation work. Costs shall include any and all debris encountered in the work regardless
of severity and disposing of all debris. Costs shall also include submittals of the digital inspections
in PACP format to the Engineer as specified. Further, costs shall include any and all costs
associated with accessing the sewers and manholes to perform the work as specified including
building access roads, negotiating with property owners, traffic control, complete restoration of
areas disturbed by the work, etc. This item includes working in any location (unpaved areas or
126
paved areas), except easements as defined further below. A bid item is included as an add-on price
for cleaning and televising sewers in easements; easements shall be as defined further below.
The base bid items (Item 1A, 1B and 1C) are for cleaning and televising sewers in non-easement
areas. Non-easement areas are defined as roads, other paved areas, graveled areas, and landscaped
areas not defined as easements herein. An add-on bid item (Item 1D) is provided for cleaning and
televising sewers in easement areas (any sewer diameter). Easement areas are defined as wherever
the set-up manhole is located 50 feet or more from the nearest paved or graveled surface. Payment
will be made for the entire length of sewer cleaned and televised where the set-up manhole meets
this criterion. If sewer cleaning and television inspection occurs in an easement area as defined
herein, payment will be made for the entire length from manhole to manhole under the base bid
item for non-easement areas plus the entire length from manhole to manhole under the add-on bid
item. The add -on bid item shall cover any diameter sewer being cleaned and televis ed. T he
Engineer’s decision on what constitutes an easement area shall be final.
Sewer cleaning and television inspection will be measured and paid for on a linear foot basis to
the nearest one-tenth of a foot. Measurement will be along the horizontal centerline of the pipe
with no deductions for manholes and will be from center of manhole to center of manhole.
Bid Item 1E is included for verifying if service laterals are active. A camera shall be deployed in
the sewer segment where the service lateral is located. Dye with sufficient color and concentration
to readily see if present shall be poured in the clean -out and the camera maneuvered within the
sewer segment to find the location where the dye is entering. If a clean- out is not present, the
Contractor shall coordinate with homeowners or business owners to have the homeowners or
business owners pour dye into a toilet and flush (or multiple plumbing fixtures if it appears that
the property may have two laterals). The Contractor shall make every reasonable effort to
coordinate with the homeowners or business owners prior to mobilizing the CCTV truck and
document the effort. Payment will be made for each clean -out or home/business where dye is
introduced. Video of dye entering the sewer with accurate footage of the location of the service
lateral or video proving that the entire sewer segment was televised and no dye was present shall
be submitted to the Engineer.
Payment will be made on the basis of the unit prices bid in the Bid.
This item does not include televising sewers for final acceptance. Those costs shall be included in
the various unit prices for that work – no separate payment will be made.
Items 2A through 2D - Point Repairs to Existing Sewers : This item includes all materials,
equipment, and work required to perform point repairs to existing main sewers.
Bid Items 2A, 2B and 2C are included for performing point repairs to existing 8”, 10” and 12”
main sewers at various depths. Bid Items are included for a lump sum payment for performing
point repairs a minimum of 8 feet long up to 12 feet in length and payment per linear foot for each
foot over 12 feet. The Contractor shall not exceed 12 feet in length unless specified by the
Engineer and/or as agreed to by the Engineer in the field prior to the work being completed. The
Contractor shall not be paid for any length over 12 feet under any circumstances unless specified
and/or approved by the Engineer prior to the work. If specified and/or approved by the Engineer,
127
when a point repair exceeds 12 feet in length, the Contractor shall be paid for the first 12 feet of
the point repair under the lump sum Bid Item and then on a linear foot basis for each foot over 12
feet. The work shall be performed as specified and in accordance with Detail SS-22.
The base bid includes using PVC pipe for the repair. If ductile iron pipe is required, the add-on
price for this pipe material will be paid under Bid Item 2D.
The base bid items include backfilling with the excavated soil. If the excavated soil is not suitable
for backfilling or ABC stone or flowable fill are required for backfilling the trench, payment for
removing and disposing of the excavated material offsite and importing the specified material will
be paid under Bid Items 17D, 17E and 17F.
The base bid items include all required restoration of grassed areas disturbed by the work.
Restoration of asphalt pavement, concrete, curbs and gutters, sod and graveled areas shall be paid
separately under Bid Item 17.
These items further include payment for saw -cutting existing asphalt or concrete up to 6 inches
thick (additional thickness paid under Item 17) and disposing of material, excavation, removal and
off-site disposal of existing soil and sewer pipe, installation of new sewer, connections to existing
manholes and sewers, bedding, backfilling, compaction, bypass sewage pumping during
construction, accessing sewers and manholes as specified, traffic control, compliance with
required working hours, coordination with and location of existing utilities, erosion control, and
all else incidental thereto for which separate payment is not provided under other Bid Items. This
item also includes television inspection of all point repairs to confirm proper installation.
Payment will be made for each point repair at the installed depth. Payment will be made on the
basis of the unit price bid.
Payment will not be made for any length outside of the required point repair length as defined by
the Engineer unless approved by the Engineer prior to performing the point repair. In addition, no
payment will be made for additional repairs located outside of the defined length that are required
as a result of the Contractor’s work on the defined point repair.
Items 2E through 2I – Service Lateral and Cleanout Installation : Th ese items include
replacing existing service connections and service laterals as part of point repair work and when
lateral replacement and cleanout installations are specified.
Bid Item 2 E is included for installing tee- wye connections (ductile iron and PVC) within point
repair segments to reconnect service laterals to the main sewer for various pipe diameters at any
depth and installing 6 feet of PVC or DIP lateral. Typically, the new tee-wye will be ductile iron
whenever CIPP will be installed after the repair is made and will be PVC when the existing main
sewer pipe material is PVC. Refer to Detail SS-16.
Bid Item 2F is for installing a new service lateral from the end of the tee- wye connection and 6
feet of pipe installed under Bid Item 2E to the property line or point of termination specified by
the Engineer. Bid Items are included for new 6” PVC and ductile iron service laterals at various
128
depths (actual depth of the new service lateral). Payment for this item will begin at the end of the
6 feet of pipe installed as part of the tee -wye connection or for any new lateral pipe installed that
is not part of a tee-wye connection. Tracer wire shall be installed along all new laterals installed
as part of main sewer replacements from manhole to manhole at no additional cost. Measurement
will be for actual footage of new lateral pipe installed. Measurement of linear footage will be
along the centerline of the service lateral from the end of the 6 feet of lateral included in the tee-
wye connection to the end of the installed lateral (typically to the property line or edge of the sewer
or road right-of-way).
Bid Item 2G is included for installing cleanouts on new 6” PVC and ductile iron service laterals
installed under Item 2F (any depth of cleanout). In some cases, a cleanout may be specified for
installation without replacing the lateral or installing a new lateral. These stand -alone cleanouts
will be paid under Bid Item 2H . The cleanout shall be in accordance with Detail SS-6.5. The
cleanout shall be considered to begin at the wye fitting on the service lateral pipe. This item
includes cleanouts on any size lateral at any depth.
Bid Item 2 I is included for connecting new lateral pipes to existing precast concrete manholes,
including core drilling the manhole wall and installing a new flexible manhole sleeve connect or
per Detail SS-7.1. If the existing manhole is brick or block, the connection shall be made by
sealing the opening around the pipe with non- shrink grout and pouring a conc rete collar on the
outside of the wall per Detail SS-20. Lateral pipes connecting to new manholes will be paid under
Item 2F.
These items further include payment for saw -cutting existing asphalt or concrete up to 6 inches
thick (additional thickness paid under Item 17) and disposing of material, excavation, removal and
off-site disposal of existing soil and sewer pipe, installation of new sewer, connections to existing
sewers, bedding, backfilling, compaction, bypass sewage pumping during construction, accessing
sewers and manholes as specified, traffic control, compliance with required working hours,
coordination with and location of existing utilities, erosion control, and all else incidental thereto
for wh ich separate payment is not provided under other Bid Items. This item also includes
television inspection of all new service laterals to confirm proper installation.
Item 2J – Storm Sewer Replacement: Bid Item 2J is included for replacing existing storm sewer
as necessary with new RCP storm sewer that may be encountered/damaged during point repairs.
Payment will not be made for any storm sewer replacement unless approved by the Engineer prior
to performing the repair.
Item 3 - Replacing Existing Sewers with New Sewers from Manhole to Manhole: This item
includes all materials, equipment, and work required to replace existing sewers from manhole to
manhole as specified and in accordance with the standard specifications and details. The Bid
includes Bid Items for 8” PVC sewers at varying depths with an add-on cost for installing ductile
iron pipe when specified. The Engineer will define the existing and new sewer sizes. The depth
will be determined in the field.
129
When ductile iron pipe is specified, the Contractor shall be paid for the length installed under the
PVC bid item (Bid Item 3A) at the corresponding depth plus the length installed under the add-on
ductile iron bid item (Bid Item 3B).
Bid I tem 3C is also included for installing PVC and ductile iron tee -wyes within the sewer
replacement section to reconnect service laterals to the new sewer, including installing 6 feet of 6”
PVC or ductile iron lateral pipe as noted in the Bid Form. Additional lateral pipe length will be
paid under Bid Item 2F.
This item includes payment for sawcutting existing asphalt or concrete up to 6 inches thick
(additional thickness paid under Item 17) and disposing of material, excavation, removal and off-
site disposal of existing sewer pipe and manhole m aterials, surveying services to install the new
sewers, installation of new sewer, watertight connections to existing manholes and new manholes,
bedding, backfilling with excavated soil and compaction, product testing and low pressure air
testing, mandrel testing, bypass sewage pumping during construction where required, accessing
sewers and manholes as specified, traffic control, compliance with required working hours,
coordination with and location of existing utilities, and for all else incidental thereto for which
separate payment is not provided under other bid items. In addition, this item shall include
installing tracer wire along all main sewers from manhole to manhole and terminating the tracer
wire in the manholes as directed by the Engineer at no additional. This item shall also include
complete restoration of grassed areas disturbed by the work. Other restoration shall be paid under
Bid Item 1 7. Further, this item includes cleaning and televising the new sewers after the new
sewer and connecting laterals are installed and prior to requesting payment.
Pipe replacement will be measured in place on a linear foot basis to the nearest foot along the
horizontal centerline of the pipe with no deductions for manholes and will be from center of
manhole to center of manhole, at the corresponding depth.
The base bid items for the new sewers include backfilling with the excavated soil. If the excavated
soil is not suitable for backfilling or ABC stone or flowable fill are required for backfilling the
trench, payment for removing and disposing of the excavated material offsite and importing the
specified material will be paid under Bid Items 17D, 17E and 17F.
Payment will be made on the basis of the unit prices bid.
Item 4A – Installation of New External DIP Drop Connections at Existing or New Manholes:
This item includes all materials, equipment, and work required to install new external drop
connections at existing or new manholes in accordance with the specifications and details . Bid
Items are included for new 8” ductile iron drop connections at vertical lengths up to 5 feet (lump
sum payment) and for vertical lengths over 5 feet (cost to be added to the lump sum cost). When
an external drop pipe exceeds 5 feet in vertical length, the Contrac tor shall be paid for the first 5
feet of the drop under the lump sum Bid Item and then on a vertical foot basis for each foot over 5
feet. This item includes payment for installing a full joint of new ductile iron sewer to connect the
new drop to the existing sewer and for connecting to the existing sewer with a rubber coupling
with shear rings. Any footage beyond the full joint of pipe required to properly connect the new
drop to the existing sewer (as agreed by the Engineer) will be
Text truncated. Open the original for the full document.