RecordWell Data

Public Works Committee Meeting september 2022

City of Mauldin · Greenville County · meeting of Sep 2, 2022 · Notices

Open the original document More from City of Mauldin

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

PUBLIC WORKS COMMITTEE MEETING TUESDAY, SEPTEMBER 6, 2022 | 6 PM 5th committee meeting The Committee will meet in Mauldin City Hall at 5 East Butler Road in the Council Chambers at 6 p.m. The meeting will be available remotely through Zoom. Please visit the City’s website at https://cityofmauldin.org/your-government/meeting-minutes-agendas/ to access the meeting via audio and videoconferencing. A quorum of Council will be present. 1 PUBLIC WORKS COMMITTEE MEETING SEPTEMBER 6, 2022, 6PM CITY HALL - COUNCIL CHAMBERS 5 E. BUTLER ROAD Committee Members: Jason Kraeling (Chair), Carol King, Michael Reynolds 1. Call to Order 2. Public Comment 3. Reading and Approval of Minutes a.Public Works Committee Meeting: August 1, 2022 [Pages 3-4] 4. Reports or Communications from City Officers a. Public Works Director Matt Fleahman Budget Review b.Maverick Yards Maintenance [Pages 5-7] c.Mosquito Spraying Program Analysis [Pages 8-10] 5. Unfi nished Business There is no unfinished business. 6. New Bus iness a.Sewer Rehab Program Contract [Pages 11-213] b.Missed Garbage Can Fee [Pages 214-215] c.Side-Arm Trash Truck Purchase [Page 216] d.Stormwater Engineering Task Order 02 [Pages 217- 307] 7. Publ ic Comment 8. Committee Concerns 9. Adjournment The Honorable Jason Kraeling The Honor able Jason Kraeling The Honor able Jason Kraeling The H onorable Jason Kraeling The Ho norable Jason Kraeling The Honorable Jason Kraeling The Honorable Jason Kraeling The Honorable Jason Kraeling The Honorable Jason Kraeling 2 MINUTES PUBLIC WORKS COMMITTEE MEETING AUGUST 1, 2022, 6PM CITY HALL - COUNCIL CHAMBERS 5 E. BUTLER ROAD 2nd committee meeting Co mmittee Members present: Jason Kraeling (Chair), Carol King, Michael Reynolds Others present: PW Director Matt Fleahman and Interim City Administrator Rebecca Vance 1. Call t o Order- Chairman Kraeling 2. Public Comment- None 3. Re ading and Approval of Minutes a. Public Works Committee Meeting: July 5, 2022 M otion: Councilwoman King made a motion to approve the minutes with Councilman Kraeling seconding. Councilman Reynolds was not present at the July committee meeting and will not vote. V ote: The vote was unanimous (2-0). 4. Re ports or Communications from City Officers a. Public Works Director Matt Fleahman Budget Review- Mr. Fleahman reported all Public Works divisions are at least 96-98% of their budgets. Mr. Fleahman reported the sewer lines at Bridgeway Station have been relined. Basin 5 point repairs were completed last week. Road paving will begin next week. A third side-arm truck is on the road and the fourth should be here in about a week. Enterprise Asset will be onsite to start implementation of the new software. C hairman Kraeling asked if the sidearms would replace our entire sanitation truck fleet. Mr. Fleahman answered yes. The older trucks will be sold to help offset some of the expenditures. C hairman Kraeling asked about implementation of a fee if Public Works has to make an extra trip to pick up a resident’s trash when they forget to put their trash can out. Mr. Fleahman said it would be hard to do, but he would compile some information on what other municipalities do. 5. Un finished Business- There is no unfinished business. 6. Ne w Business- There is no new business. 3 7. Public Comment Diane Kuzniar: I am Diane Kuzniar from 503 Knollwood Drive. If their cans are not put out, the trash doesn’t get picked up. If I forgot to put my can out, I am not going to call and say come back and get it. 8. Committee Concerns Councilman Reynolds asked about the mosquito spraying. Chairman Kraeling said he did some research on one of the concerns, which was the chemicals being harmful to bees. The chemicals we use are not strong enough to cause them harm. Mosquitoes are much smaller than bees. The City is still looking at other options. There are other chemicals that could be used. There is money to purchase something different if council wants to change. Mr. Fleahman said he should have information for committee next month, to include staff time and truck costs for spraying. 9. Adjournment- Chairman Kraeling adjourned the meeting at 6:28 p.m. Respectfully Submitted, Cindy Miller Municipal Clerk 4 PUBLIC WORKS COMMITTEE AGENDA ITEM MEETI NG DATE: September 6, 2022 AGE NDA ITEM: 4b TO: Public Works Committee FROM: Public Works Director, Matthew Fleahman SUBJECT: Maverick Yards Maintenance REQUEST Information only – to provide an estimate for the total costs associated with the maintenance of Maverick Yards by the Parks Division of the Public Works Department. HISTORY/BACKGROUND During the August 2022 City Council Meeting, Council requested that the Public Works Departme nt evaluate the total costs associated with the maintenance of the Maverick Yards property and present it to the Public Works Committee. ANALYSIS or STAFF FINDINGS Attached is a narrative of the total labor costs and fuel costs associated with the mainte nance of the Maverick Yards property. The evaluation takes into consideration both the growing season and the dormant season and the variable tasks necessary to maintain the property. It is determined that the realized cost to the City for the Public Works Department to maintain the property is less than the quote submitted from a third-party vendor. FINANCIAL IMPACT The cost associated the Public Works Department maintaining the property is approximately three thousand dollars less than the proposed contract annually. RECOMMENDATION No recommendation is provided as this evaluation is for information only, no action is required. 5 CITY OF MAULDIN MAULDIN PUBLIC WORKS 700 East Standing Springs Road Simsponville, South Carolina 29680 August 19, 2022 Mauldin City Council 5 East Butler Road Mauldin, South Carolina 29662 Sir/Madame: Public Works has been tasked with evaluating the total cost to maintain the Maverick Yards property located at the corner of US-276 and East Butler Road. An initial cost estimate from a contractor was submitted at a cost of 11,500 dollars annually. Below is a summary of the related costs to conduct the work inhouse as well as a narrative explaining how the figures were determined. The maintenance of the property will be considered in two separate periods of time, both the growing season and the dormant season. The growing season will be considered the months of April through October and the dormant season will be November through March. Activities from staff will vary based these two seasons; however, the tasks of picking up trash, pulling weeds, and blowing the parking lot will be routine throughout the year. During the growing season staff will edge, weed eat, and cut grass in addition to the routine tasks. The following evaluation is based on approximately 6 weeks of continued maintenance of the property. During the growing season, staff will be onsite twice per week for a total of 8 working hours. The growing season will be 30 weeks long, so the total man hours will be 240 during this period. During the dormant season, staff will be onsite once per week for a total of 4 working hours. The dormant season will be 22 weeks long, so the total man hours will be 88 during this period. A summation of both periods brings the total man hours to 328 annually. The average pay in the Parks Division is approximately 16.50 per hour. If we consider the fringe package for each employee which includes insurance, retirement, etc. a value of 39% is used as a standard. This is an approximate value provided by the City’s Human Resources Department. A multiplication of the total hours (x) hourly rate (x) fringe benefits, a total labor cost for the year is determined at 7,522.68 dollars. In addition to labor costs, the cost associated with fuel for the work needs to be included to better document the total cost to the City. Fuel usage rates are not available for the Parks Division, so a nominal figure of one gallon per hour has been utilized. At a total of 328 man hours it is calculated that 328 gallons of fuel is used. At a cost of 3.30 dollars per gallon, the total fuel cost is presented as 1,082.40 dollars annually. A total expenditure for the City of $7,522.68 (labor) and $1,082.40 (fuel) is determined to be $8,605.08 which is nearly three thousand dollars less than the proposed estimate. Below is a summary of the values presented in this narrative: 6 CITY OF MAULDIN MAULDIN PUBLIC WORKS 700 East Standing Springs Road Simsponville, South Carolina 29680 April - October Hours a week: 8 Weeks total 30 Total Hours 240 Nov-March Hours a week: 4 Weeks total: 22 Total Hours: 88 Total Annual Hours: 328 Pay Rate: $16.50 Employee Cost: $5,412.00 Fringe Benefits 39% Total Labor Cost: $7,522.68 Fuel Cost: $1,082.40 Total Cost to City: $8,605.08 It is imperative that I also point out that the Parks Division of the Public Works Department has been maintaining this property the entire time that I have been the Public Works Director. Because of that, these proposed labor costs are already realized and do not represent any additional work proposed for the Division. Sincerely, Matthew Fleahman Director of Public Works 7 PUBLIC WORKS COMMITTEE AGENDA ITEM MEETI NG DATE: September 6, 2022 AGE NDA ITEM: 4c TO: Public Works Committee FROM: Public Works Director, Matthew Fleahman SUBJECT: Mosquito Spraying Program Evaluation REQUEST Information only – to provide an estimate for the total costs associated with the annual Mosquito Spraying Program by the Parks Division of the Public Works Department. HISTORY/BACKGROUND During the August 2022 Public Works Committee Meeting, Council requested that the Public Works Department evaluate the total costs associated with the annual Mosquito Spraying Program and present it to the Public Works Committee. ANALYSIS or STAFF FINDINGS Attached is a narrative of the total labor costs, chemical costs, and fuel costs associated with the maintenance of the annual Mosquito Spraying Program. FINANCIAL IMPACT The cost associated the Public Works Department annual Mosquito Spraying Program is $17,477.40. RECOMMENDATION No recommendation is provided as this evaluation is for information only, no action is required. 8 CITY OF MAULDIN MAULDIN PUBLIC WORKS 700 East Standing Springs Road Simsponville, South Carolina 29680 August 1 9, 2022 Mauldin City Council 5 East Butler Road Mauldin, South Carolina 29662 Sir/Madame: Public Works has been tasked with evaluating the total annual cost for its City-wide Mosquito Spraying Program. The request was made during a Public Works Committee Meeting in response to concerns brought forward to Committee from citizens. Below is a narrative of the related costs to conduct the City- wide program and includes labor costs, chemical costs, and fuel costs. The program runs annually from April through October. Public Works staff work in teams of two and generally work six hours a night for four nights per month. The calculation of total annual hours is as follows: 2 (staff members) x 6 (hours per night) x 4 (nights per month) x 7 (months) for a grand total of 336 hours. The average pay rate for mosquito spraying is $17.50 per hour. The rate is greater than the average for the Division because the staff members who conduct the work are more tenured and are licensed pesticide applicators. Because the work is all after hours, the pay rate for employees is at time and a half. This pay rate is thus $26.25 per hour. The total cost to the City includes not only staff pay, but the fringe package associated with their employment. A rate of 39% has been provided by the City’s Human Resources Department and covers insurance, retirement, etc. The labor cost is calculated as follows: 336 (annual hours) x $26.25 (per hour) x 1.39 (fringe rate) for a total cost of $12,259.80 annually. In addition to labor costs, the City also incurs the cost of fuel and of chemicals. The annual chemical costs for the mosquito spraying program are $3,000. Fuel usage rates for the activity is not adequately tracked for this evaluation so an estimate has been made based on the hours both the truck and the sprayer are in operation. During the spraying the truck is driving in the range of 15 to 20 miles per hour. With a fuel efficiency of approximately 17 to 20 miles per gallon, a usage rate of one gallon per hour for the truck is applied. A similar usage rate for the sprayer was utilized in the calculation. At a cost of 3.30 dollars per gallon and total hours of 336 (truck) and 336 (sprayer), a total fuel cost is determined at $2,217.60 annually. A summation of the labor costs, chemical costs, and fuel costs equates to an annual cost of $17,477.40. Below is a summary table of the values discussed above in this calculation: April - October Staff Members 2 Hours per employee 6 Nights per month 4 Total Months 7 Total Annual Hours 336 9 CITY OF MAULDIN MAULDIN PUBLIC WORKS 700 East Standing Springs Road Simsponville, South Carolina 29680 Pay Rate: $17.50 Overtime Rate $26.25 Employee Cost $8,820.00 Fringe Benefits 39.00% Total Labor Cost $12,259.80 Fuel Cost $2,217.60 Chemical Cost $3,000.00 Total Cost to City: $17,477.40 Addit ional costs could be added into this calculation to encompass the labor and materials for the maintenance of the City-owned truck as well as depreciated value of for the equipment. These values were left out because the equipment would depreciate whether or not its used, and the maintenance of the truck is only increased one oil change per year. The oil change cost is insignificant to the total cost of the annual program. Sincerely, Matthew Fleahman Director of Public Works 10 PUBLIC WORKS COMMITTEE AGENDA ITEM MEETING DATE: September 6, 2022 AGENDA ITEM: 6a TO: Public Works Committee FROM: Public Works Director, Matthew Fleahman SUBJECT: Sewer Rehabilitation Program REQUEST Authorization is requested to execute the attached contract between the City of Mauldin and CaJenn Construction & Rehabilitation (C/O Frazier Engineering, P.A). HISTORY/BACKGROUND In the Council approved FY2022 budget, $600,000 was budgeted in the Sewer Division of the Public Works Department for sewer rehabilitation. These monies were included in the Federal ARPA distribution from October 2022. In the FY2023 Council approved budget, $734,925 was budgeted in the Sewer Division of the Public Works Department for sewer rehabilitation. These monies are included in the Federal ARPA distribution which will be received in October 2023. The City of Mauldin (City) and Frazier Engineering (Engineer) entered into an Agreement dated March 15, 2015 for Engineering- Construction Management Services related to the City's Sewer Rehabilitation Program. The contract has been amended to allow for the Engineer to provide general engineering services related to the City's overall rehabilitation program and providing design and construction management services for the City's sewer rehabilitation construction projects. The most recent amendments were made during the December 2021 Council meeting to authorize the use of ARPA f unds to rehabilitate additional sewer mainlines. ANALYSIS or STAFF FINDINGS CaJenn Construction & Rehabilitation is current doing sewer rehabilitation work for the City of Simpsonville and Metro Connects. In both situations, Frazier Engineering is the consulting engineer on the projects. The contracts with Metro and Simpsonville were competitive bid projects which Cajenn Construction & Rehabilitation won. For the work in Mauldin, the Public Works Department asked if the City could “piggy- back,” on either contract . Based on a review of both contracts, Frazier Engineering determined that the Metro Connects contract was the “most similar,” to our proposed rehabilitation project. In accordance with the Council approved Purchasing Policy, Cooperative Purchasing is an approved alternative to the sealed bid method of soliciting bids. This method which is most advantageous to the City and result s in the most timely, acceptable quality, economical, and successful completion of the construction project. 11 FINANCIAL IMPACT The cost associated with this contract will not exceed $1,200,000. RECOMMENDATION Staff recommends the Public Works Committee and the City Council approve the contract. 12 13 14 TABLE OF CONTENTS Contents AGREEMENT ................................................................................................................................................ 00200-1 BID .............................................................................................................................................................. 00310-1 PERFORMANCE BOND ................................................................................................................................. 00400-1 PAYMENT BOND ......................................................................................................................................... 00500-1 GENERAL CONDITIONS ................................................................................................................................ 00700-1 FORMS ........................................................................................................................................................ 00950-1 TECHNI CAL SPECIFICATIONS SECTION TITLE NO. OF PAGES 01010 SUMMARY OF WORK...................................................................................................................... ..31 01140 PROJEC T ACCESS AND RESTRICTIONS ............................................................................................... 1 01200 PROJECT MEETINGS ..........................................................................................................................1 01270 MEASUREMENT AND PAYMENT.......................................................................................................1 7 01300 SUBMITTALS ......................................................................................................................................3 01340 SHOP DRAWINGS, WORKING DRAWINGS, AND SAMPLES ................................................................ 7 01410 REGULATORY REQUIREMENTS AND REFERENCES ............................................................................ 2 01510 TEMPORARY UTILITIES ...................................................................................................................... 1 01550 VEHICULAR ACCESS AND TRAFFIC CONTROL .................................................................................... 1 01560 TEMPORARY BARRIERS AND CONTROLS ........................................................................................... 2 01570 ENVIRONMENTAL PROTECTION ........................................................................................................1 01700 PROJECT CLOSEOUT ..........................................................................................................................1 01720 PROJECT RECORD DRAWINGS ........................................................................................................... 3 01725 EXISTING UTILITIES ............................................................................................................................2 01740 CLEANING ......................................................................................................................................... 1 02650 SEWER CLEANING AND TELEVISION INSPECTION ............................................................................. 8 02766 CURED-IN-PLACE PIPE LINING (CIPP) FOR LATERALS.........................................................................7 02767 CIPP FOR MAIN SEWERS - UV CURED ..............................................................................................17 02768 MANHOLE REHABILITATION ..............................................................................................................9 02900 LANDSCAPE RESTORATION................................................................................................................6 15 SECT ION 00200 AGREEMENT THIS AGREEMENT, made this ________ day of ___________________________, 20___, by and between the City of Mauldin herein after called "OWNER" and CaJenn Construction & Rehabilitation Services, Inc. of the City of Hoboken, County of Brantley, and State of Georgia, hereinafter called "CONTRACTOR". WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned: 1. The CONTRACTOR hereby agrees with the OWNER to commence and complete the construction described as follows: 2022-2023 SEWER REHABILITATION PROJECT hereinafter called the PROJECT. 2. This AGREEMENT is being entered into through a COOPERATIVE PURCHASING AGREEMENT (“PIGGYBACK” AGREEMENT) process in accordance with Title 11, Chapter 35, Section 11-35-4810 of the South Carolina Code of Laws. The OWNER is entering into this AGREEMENT with the CONTRACTOR based on the CONTRACTOR’s Bid for the FM400B-343 Basin Find & Fix CIPP Project submitted to the Metropolitan Sewer Subdistrict (dba MetroConnects), Greenville, South Carolina on February 10, 2022, at which time the Bid was publicly opened and read aloud. The CONTRACTOR subsequently entered into an AGREEMENT with MetroConnects to perform the work. The OWNER (City of Mauldin) is undertaking similar work as Bid on the MetroConnects’ FM400B-343 Basin Find & Fix CIPP Project, and via this AGREEMENT, the CONTRACTOR agrees to perform the OWNER’s work in accordance with the terms, conditions and specifications of the MetroConnects’ Contract Documents (except as modified herein) at the unit prices bid on February 10, 2022. The Contract Documents bound with this AGREEMENT are directly incorporated from the MetroConnects’ Contract with the CONTRACTOR for the FM400B-343 Basin Find & Fix CIPP Project. Any modifications to the Contract Documents are as defined in Item 6 below. 3. The CONTRACTOR will furnish all of the materials, supplies, tools, equipment, labor, and other services necessary for the construction and completion of the PROJECT descr ibed herein. 4. The CONTRACTOR will commence work required by the CONTRACT DOCUMENTS within fifteen (15) calendar days after the date of the NOTICE TO PROCEED and will fully complete the PROJECT within 365 calendar days from the date of the NOTICE TO PROCEED unless the period for completion is extended otherwise by the OWNER via change order(s). The CONTRACTOR further agrees to pay, as liquidated damages, the 16 sum of seven hundred fifty dollars ($750) for each consecutive calendar day thereafter as herein provided in the SPECIAL PROVISIONS. 5. The CONTRACTOR agrees to perform all of the WORK described in the CONTRACT DOCUMENTS and comply with the terms therein for an amount of up to ($1,200,000) One Million Two Hundred Thousand Dollars and No Cents based on the actual work performed at the unit prices shown in the Bid Schedule. The OWNER may increase this Contract Amount via change order(s) to complete additional sewer rehabilitation work. 6. The term "CONTRACT DOCUMENTS" means and includes the following: A. Agreement – Section 00200 B. Bid – Section 00310 : The Bid included herein is the C ONTRACTOR’S Bid submitted to MetroConnects for the FM400B-343 Basin Find & Fix CIPP Project on February 10, 2022. The OWNER will utilize the same Bid Items for this PROJECT, and the CONTRACTOR shall honor the unit prices bid as shown on the Bid Form. C. Performance Bond – Section 00400 D. Payment Bond – Section 00500 E. General Conditions – Section 00700 F. Special Provisions – Section 01 010: The Special Provisions included in these Contract Documents have been modified to reflect the specific project requirements for the OWNER’s PROJECT. G. Specifications directly incorporated from the MetroConnects ’ FM400B-343 Basin Find & Fix CIPP Project as enumerated in the Table of Contents. H. N otice to Proceed I. Change Orders J. Drawings as prepared by Frazier Engineering, P.A. and issued to the CONTRACTOR during construction of this PROJECT. In addition, the Drawings prepared by Frazier Engineering, P.A. for the MetroConnects’ FM400B-343 Basin Find & Fix CIPP Project dated January 2022 are incorporated herein by reference, specifically the general requirements on Sheet G-1, the Technical Details shown on Sheets D-1 through D-7, and the Erosion Control Details shown on Sheets EC -1 through EC-2. K. These Specifications prepared by Frazier Engineering, P.A. dated August 2022. 7. The OWNER agrees to pay the CONTRACTOR in the manner and at such times as set forth in the General Conditions such amounts as required by the CONTRACT DOCUMENTS. 8. This Agreement shall be binding on all parties hereto and their respective heirs, executors, administrators, successors and assigns. 17 IN WITNESS WHEREOF, the parties hereto have executed or caused to be executed by their duly authorized officials, this Agreement in three (3) counterparts, each of which shall be deemed an original, in the year and day first above written. City of Mauldin (OWNER) By:_____________________________________ (SEAL) _________________________________________ ATTEST _ ________________________________________ (Title of Authorized Official) __________________________________________ (Witness) __________________________________________ (Witness) CaJenn Construction & Rehabilitation Services, Inc. (CONTRACTOR) By:____________________________________ ______________________________________ (Printed Name) ______________________________________ (Title) PO Box 38 Hoboken, GA 31542 (SEAL) ATTEST: __________________________________________ (Witness) __________________________________________ (Witness) (End of Section 00200) 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 SECTION 00400 PERFORMANCE BOND KNOW ALL MEN BY THESE PRESENTS: that _____________________________________________________________________________ (Name of Contractor) (Address of Contractor) a ___________________________________________________, hereinafter called Principal and (Corporation, Partnership or Individual) (Name of Surety) (Address of Surety) hereinafter called Surety are held and firmly bound unto the (Name of Owner) (Address of Owner) hereinafter called OWNER, in the penal sum of ________________________________________ _______________________________________Dollars, ($____________ _________________) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors, and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION is such that whereas the Principal entered into a certain contract with the OWNER, dated the ______________ day of ___________________, 20________, a copy of which is hereto attached and made a part thereof for the construction of: 2022-2023 SEWER REHABILITATION PROJECT NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions, and agreements of said contract during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without notice to the Surety and during the one- year guaranty period, and if he shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and save harmless the OWNER from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the WORK to be performed thereunder or the SPECIFICATIONS accompanying the same shall in any wise affect its obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the contract of to the WORK or to the SPECIFICATIONS. 33 PROV IDED, FURTH ER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this the _____________ day of _________________________, 20________. ________________________________ ATTEST Principal ____________________________________ (Principal) Secretary By:_____________________________(S) (SEAL) _________________________________ Address ________________________________ ____________________________________ Witness as to Principal ____________________________________ Address ____________________________________ __________________________________ Surety ATTEST: By:_______________________________ Attorney-in-fact ____________________________________ (Surety) Secretary _________________________________ Address ________________________________ ____________________________________ Witness as to Surety ____________________________________ Address ____________________________________ NOTE: Date of BOND must not be prior to date of Contract. If CONTRACTOR is Partnership, all partners should execute BOND. IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State where the PROJECT is located. (End of Section 00400) 34 SECTION 00500 PAYMENT BOND KNOW ALL MEN BY THESE PRESENTS: that _____________________________________________________________________________ (Name of Contractor) _______________________________________________________________________________ (Address of Contractor) ________________________________________________________________, hereinafter called (an individual), (a Partnership), or (a Corporation) Principal, and ___________________________________________________________________ (Name of Surety) _______________________________________________________________________________ (Address of Surety) hereinafter called Surety, are held and firmly bound unto __________________________________ _______________________________________________________________________________ (Name of Owner) _______________________________________________________________________________ (Address of Owner) hereinafter called OWNER, in the penal sum of _________________________________________ ________________________________________ Dollars, ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors, and assigns, jointly and severally, firmly, by these presents. THE CONDITION OF THE OBLIGATION is such that whereas, the Principal entered into a certain contract with the OWNER, dated the __________ day of _______________________, 20_______, a copy of which is hereto attached and made a part hereof for the construction of: 2022-2023 SEWER REHABILITATION PROJECT NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms, SUBCONTRACTORS, and corporations furnishing materials for or performing labor in the prosecution of the WORK provided for in such contract, and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, fuel, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such WORK, and all insurance premiums on said WORK, and for al l labor, performed on such WORK, whether by SUBCONTRACTOR or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the WORK to be performed thereunder or the SPECIFICATIONS accompanying the same shall in any wise affect its 35 obli gation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the contract or to the WORK or to the SPECIFICATIONS. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this the _____________ day of _________________________, 20________. _________________________________ ATTEST: Principal _____________________________________ (Principal) Secretary By:_____________________________(S) (SEAL) __________________________________ Address _________________________________ _____________________________________ Witness as to Principal _____________________________________ Address _____________________________________ __________________________________ Surety ATTEST: By:_______________________________ Attorney-in-fact _____________________________________ (Surety) Secretary __________________________________ Address (SEAL) _________________________________ _____________________________________ Witness as to Surety _____________________________________ Address _____________________________________ NOTE: Date of BOND must not be prior to date of Contract. If CONTRACTOR is a Partnership, all partners should execute BOND. IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State where the PROJECT is located. (End of Section 00500) 36 SECTION 00700 GENERAL CONDITIONS 1. GENERAL: 1.1 THE CONTRACT DOCUMENTS: 1.1.1 The Contract Documents consist of the Advertisement for Bids, Information for Bidders, Bid, Bid Bond, Agreement, Payment Bond, Performance Bond, Conditions of the Contract (General Conditions, Special Provisions and Other Conditions), Material and Technical Specifications, Drawings, Addenda, Notice of Award, Notice to Proceed and Change Orders. 1.2 CORRELATION AND INTENT OF DOCUMENTS: 1.2.1 The Contract Documents are complementary, and what is required by any one shall be as binding as if required by all. 1.2.2 The intent of the Drawings and Specifications is that the Contractor shall furnish all labor, supplies and materials, tools, machinery, equipment, transportation, supervision, temporary construction of any nature, and all other services, facilities and means necessary for the proper execution and completion of the work in accordance with the Contract Documents and all incidental work necessary to complete the project in an acceptable manner, and fully complete the work or improvement ready for use, occupancy and operation by the Owner. 1.2.3 Any mention in the Specifications or indication on the Drawings of articles, materials, methods or operations shall require the Contractor to furnish such item or service as if it was fully specified unless it is noted or specified as not in the contract. It is intended that all materials shall be new and best quality in every respect unless otherwise noted or specified. All workmanship, methods of assembly, and erection shall be first class in every respect. 1.3 CONFLICT OR INCONSISTENCY: 1.3.1 If there is any conflict or inconsistency between the provisions of the Special Provisions and the provisions of the other Contract Documents, the provisions of the Special Provisions shall prevail. If there is any conflict or inconsistency between the provisions of the General Conditions and the provisions of any of the Contract Documents other than the Special Provisions, the provisions of the General Conditions shall prevail. 1.3.2 In the case of conflict between the Drawings and Specifications, the Specifications shall govern. Figure dimensions on Drawings shall govern over scale dimensions, and detailed Drawings shall govern over general Drawings. 1.3.3 In case of difference between small-scale and large-scale drawings, the large-scale drawings shall govern. Schedules on any contract drawing shall take precedence over conflicting information on that or any other contract drawing. On any of the drawings where a portion of the work is detailed or drawn out and the remainder is shown in outline, the parts detailed or drawn out shall apply also to all other like portions of the work. Where the word "similar" occurs on the drawings, it shall have a general meaning and not be 37 inter preted as being identical, and all details shall be worked out in relation to their location and their connection with other parts of the work. 1.3.4 Any discrepancies found between the Drawings and Specifications and site conditions or any inconsistencies or ambiguities in the Drawings or Specifications shall be immediately reported to the Engineer, in writing, who shall promptly correct such inconsistencies or ambiguities in writing. Work done by the Contractor after his discovery of such discrepancies, inconsistencies or ambiguities shall be done at the Contractor's risk. 1.3.5 Should a conflict be discovered within the Contract Documents, the Contractor shall be deemed to have estimated the higher quality way of doing the work unless he shall have asked for and obtained a decision in writing from the Engineer before entering into this contract. 1.4 ADDITI ONAL INSTRUCTIONS AND DETAIL DRAWINGS: 1.4.1 The Contractor may be furnished additional instructions and detail drawings, by the Engineer, as necessary to carry out the work required by the Contract Documents. The additional drawings and instructions thus supplied will become a part of the Contract Documents. The Contractor shall carry out the work in accordance with the additional detail drawings and instructions. 1.5 SPECIFICATION HEADINGS: 1.5.1 For convenience of reference, these Specifications are divided into various Divisions, Sections, Subsections and Paragraphs. The titles of these headings shall not be taken as a correct or complete segregation of the various types of material and labor nor as an attempt to outline jurisdictional procedures. The headings shall not be deemed to limit or restrict the content, meaning or effect of such section, subsection, paragraph, provision or part. 1.5.2 The organization of the Specifications into the various headings, and the arrangement of Drawings shall not control the Contractor in dividing the work among subcontractors or in establishing the extent of the work to be performed by any trade. Each subcontract shall be dependent upon its own definite confines, regardless of Divisions of these Specifications. No responsibility, either direct or implied, is assumed by the Owner for omissions or duplications by the Contractor or by any of his subcontractors due to real or alleged errors in arrangement of matter in Contract Documents. 1.6 DRAWING S AND SPECIFICATIONS FOR CONSTRUCTION PURPOSES: 1.6.1 The Contractor will be furnished five (5) complete sets of Drawings and Specifications to be used during the course of construction. If more than five (5) sets are needed, the Contractor will be required to pay the actual cost of printing and handling. 1.7 DEFINITIONS: 1.7.1 Wherever the words hereinafter defined or pronouns used in their stead occur in the Contract Documents, they shall have the following meanings: 1.7.1.1 ADDEN DA: Written or graphic instruments issued prior to the execution of the Agreement which modify or interpret the Contract Documents, Drawings and Specifications by additions, deletions, clarifications or corrections. Such addendum or addenda will take 38 precede nt over the position of the general drawings and specifications concerned and will be considered as part of the Contract Documents. 1.7.1.2 AGRE EMENT: The Agreement represents the entire and integrated agreement between the parties hereto and supersedes all prior negotiations, representations or agreements either written, or oral, including the bidding documents. The Agreement may be amended or modified by a Change Order. 1.7.1.3 BID: The written offer or proposal of the bidder, submitted on the prescribed form, properly signed and guaranteed, to perform the work at the prices quoted by the bidder. 1.7.1.4 BID BO ND: The security furnished by the bidder with his proposal for the project as guaranty he will enter into a contract for the work if his proposal is accepted. 1.7.1.5 BIDDE R: Any individual, firm or corporation or combination of same submitting a bid for the work contemplated, acting directly or through a duly authorized representative. 1.7.1.6 BONDS: B id, Performance and Payment Bonds and other instruments of security furnished by the Contractor and his Surety in accordance with the Contract Documents. 1.7.1.7 CALE NDAR DAY: Every day shown on the calendar, Sundays and Holidays included. 1.7.1.8 CHANGE ORDER: A written order to the Contractor authorizing an addition, deletion or revision in the work within the general scope of the Contract Documents, or authorizing an adjustment in the contract price or contract time. 1.7.1.9 CONT RACT: The Contract Documents form the contract. The contract represents the entire and integrated agreement between the parties hereto and supersedes all prior negotiations, representations or agreements, either written or oral, including the bidding documents. The contract may be amended or modified by a Change Order. 1.7.1.10 CONT RACT DOCUMENTS: The Contract Documents consist of the Advertisement for Bids, Information for Bidders, Bid, Bid Bond, Agreement, Payment Bond, Performance Bond, the Conditions of the Contract (General, Supplemental, and other Conditions), the Drawings, the Material and Technical Specifications, Addenda issued prior to execution of the Contract, Notice of Award, Notice to Proceed and Change Orders. 1.7.1.11 CONT RACT PRICE: The total monies payable to the Contractor under the terms and conditions of the Contract Documents. 1.7.1.12 CONT RACTOR: The individual, firm or corporation with whom the Owner has executed the Agreement by which the Contractor is obligated directly, or through subcontractors, to perform work in connection with the project. The Contractor is the person or organization identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number and masculine in gender. The term Contractor means the Contractor 39 or his authorized representative. 1.7.1.13 CONT RACT TIME: The number of calendar days stated in the Contract Documents for completion of the work. 1.7.1.14 DRAWI NGS: The part of the Contract Documents which show the characteristics and scope of the work to be performed and which have been prepared or approved by the Engineer. 1.7.1.15 EART H: An excavated material or material to be excavated; all kinds of material other than rock. 1.7.1.16 ELE VATION: The figures given on the Drawings or in the other Contract Documents after the word "elevation" or abbreviation of it shall mean the distance in feet above the datum adopted by the Engineer. 1.7.1.17 ENG INEER: The person, firm or corporation named as such in the Contract Documents and duly appointed by the Owner to undertake the duties and powers herein assigned to the Engineer, acting either directly or through duly authorized representatives. 1.7.1.18 EQ UIPMENT: All machinery, together with the necessary supplies for upkeep and maintenance, and all tools and apparatus necessary for the proper construction and acceptable completion of the work. 1.7.1.19 FI ELD ORDER: A written order effecting a change in the work not involving an adjustment in the contract price or an extension of the contract time, issued by the Engineer to the Contractor during construction. 1.7.1.20 FURNI SH: Furnish and install complete, in place, and ready for use. 1.7.1.21 INFORMATION FOR BIDDERS: The Notice to Contractors containing all necessary information as to provisions, requirements, date, place and time of submitting bids. 1.7.1.22 LA TEST EDITION: The current printed documents issued eight weeks or more prior to date of receipt of bids. 1.7.1.23 MAT ERIALS: Any substance specified for use in the construction of the project and its appurtenances. 1.7.1.24 NET COST: The cost to the Contractor after application of all credits and discounts (excepting only cash discounts) and without the addition of any factor for burden, overhead or indirect cost or profit. 1.7.1.25 NOT ICE OF AWARD: The written notice of the acceptance of the bid from the Owner to the successful bidder. 1.7.1.26 NOT ICE TO PROCEED: Written communication issued by the Owner to the Contractor authorizing him to proceed with the work and establishing the date for commencement of the work. 1.7.1.27 OP TIMUM MOISTURE CONTENT FOR COMPACTION: The moisture content of a soil calculated on the basis of dry weight of 40 soil at which the soil can be compacted to the approximate maximum density under a specified standard method of compaction. 1.7.1.28 OWN ER: A public or quasi-public body or authority, corporation, association, partnership, or individual for whom the work is to be performed. 1.7.1.29 PAY MENT BOND: The approved form of security furnished by the Contractor to guarantee the payment to all persons supplying labor and materials in the prosecution of the work in accordance with the terms of the contract. 1.7.1.30 PE RFORMANCE BOND: The approved form of security furnished by the Contractor to guarantee the completion of the work in accordance with the terms of the contract. 1.7.1.31 PRE CONSTRUCTION CONFERENCE: A conference following award and prior to start of construction to be attended by a duly authorized representative of the Engineer and by the responsible officials of the Contractor and other affected parties. 1.7.1.32 PRO JECT: The undertaking to be performed as provided in the Contract Documents. 1.7.1.33 PRO POSAL: The written offer of the bidder, submitted on the prescribed form, properly signed and guaranteed, to perform the work at the prices quoted by the bidder. 1.7.1.34 PRO POSAL FORM: The approved form on which the Owner requires formal bids to be prepared and submitted for the work. 1.7.1.35 PRO POSAL GUARANTY: The security furnished by the bidder with his proposal for a project, as guaranty he will enter into a contract for the work if his proposal is accepted. 1.7.1.36 PRO VIDE: Furnish and install complete, in place, and ready for use. 1.7.1.37 RES IDENT PROJECT REPRESENTATIVE: The authorized representative of the Owner or Engineer who is assigned to the project site or any part thereof. 1.7.1.38 ROCK : An excavated material or material to be excavated; only boulders and pieces of concrete or masonry exceeding 1 cu. yd. in volume, or solid ledge rock which, in the opinion of the Engineer, requires, for its removal, drilling and blasting, wedging, sledging, barring, or breaking up with a power operated tool. No soft or disintegrated rock which can be removed with a hand pick or power operated excavator or shovel, no loose, shaken, or previously blasted rock or broken stone in rock fillings or elsewhere, and no rock exterior to the maximum limits of measurement allowed, which may fall into the excavation will be classified as rock. 1.7.1.39 SHO P DRAWINGS: All drawings, diagrams, illustrations, brochures, schedules and other data which are prepared by the Contractor, a subcontractor, manufacturer, supplier or distributor, which illustrate how specific portions of the work shall be 41 fabri cated or installed. 1.7.1.40 SPEC IALIST: An individual or firm of established reputation which is regularly engaged in, and which maintains a regular force of workmen skilled in either manufacturing or fabricating items required by the contract, installing items required by the contract, or otherwise performing work required by the contract. Where the contract specifications require installation by a specialist, that term shall also be deemed to mean either the manufacturer of the item, an individual or firm licensed by the manufacturer, or an individual or firm who will perform the work under the manufacturer's direct supervision. 1.7.1.41 SP ECIFICATIONS: A part of the Contract Documents consisting of written descriptions of a technical nature of materials, equipment, construction systems, standards and workmanship. 1.7.1.42 ST RUCTURES: Bridges, culverts, catch basins, drop inlets, manholes, retaining walls, cribbing, endwalls, buildings, sewers, service pipes, underdrains, foundation drains, and other miscellaneous items which may be encountered in the work, and which are not otherwise classified herein. 1.7.1.43 SUBBA SE: The layer or layers of specified or selected material of designated thickness or rate of application placed on a subgrade to comprise a component of the pavement structure to support the base course, pavement or subsequent layer of the construction. 1.7.1.44 SUBCO NTRACTOR: An individual, firm or corporation having a direct contract with the Contractor or with any other subcontractor for the performance of a part of the work at the site. The term subcontractor is referred to throughout the Contract Documents as if singular in number and masculine in gender and means a subcontractor or his authorized representative thereof. 1.7.1.45 SUB-S UBCONTRACTOR: An individual, firm or corporation having a direct or indirect contract with a subcontractor to perform any of the work at the site. The term sub-subcontractor is referred to throughout the Contract Documents as if singular in number and masculine in gender and means a sub-subcontractor or an authorized representative thereof. 1.7.1.46 SUBG RADE: The top surface of a roadbed upon which the pavement structure and shoulders are constructed. 1.7.1.47 SUB STANTIAL COMPLETION: That date as certified by the Engineer when the construction of the project or a specified part thereof is sufficiently completed, in accordance with the Contract Documents, so that the project or specified part can be utilized for the purposes for which it was intended. 1.7.1.48 SPEC IAL PROVISIONS: Conditions of the Contract other than the General Conditions. 1.7.1.49 SUP ERINTENDENT: The Contractor's authorized representative in responsible charge of the work. 1.7.1.50 SUP PLIER: Any person or organization who supplies materials or 42 equipm ent for the work, including that fabricated to a special design, but who does not perform labor at the site. 1.7.1.51 SUR ETY: The corporation, partnership or individual bound with and for the Contractor for the full and complete performance of the contract, and for the payment of all debts pertaining to the work. 1.7.1.52 TI TLES (OR HEADINGS): The titles or headings of the documents and subsections herein are intended for convenience of reference and shall not be considered as having any bearing on their interpretation. 1.7.1.53 WOR K: All labor necessary to produce the construction required by the Contract Documents, and all materials and equipment incorporated or to be incorporated in the project. 1.7.1.54 WRI TTEN NOTICE: Any notice to any party of the Agreement relative to any part of this Agreement in writing and considered delivered and the service thereof completed, when posted by certified or registered mail to the said party at his last given address, or delivered in person to said party or his authorized representative on the work. 1.8 ADDITI ONAL DEFINITIONS: 1.8.1 Wherever in the Specifications or on the Drawings, the words "as designated," "as detailed," "as directed," "as ordered," "as permitted," "as prescribed," "as provided," "as requested," "as required," or words of like import are used, it shall be understood that the designation, detail, direction, order, permission, prescription, provision, request or requirement of the Engineer is intended. 1.8.2 Similarly, the words "approved," "acceptable," "satisfactory," and words of like import shall mean approved by, acceptable to, or satisfactory to the Owner and/or Engineer. 1.9 ABBREVI ATIONS: 1.9.1 Where any of the following abbreviations are used in the Specifications, they shall have the meaning set forth opposite each. AA Aluminum Association AAMA Architectural Aluminum Manufacturers Association AAN American Association of Nurserymen AAR Association of American Railroads AASHTO American Association of State Highway and Transportation Officials AATC American Association of Textile Chemists and Colorists ACI American Concrete Institute ACPA American Concrete Pipe Association AED American Equipment Dealers AFBMA Anti-Friction Bearing Manufacturers Association, Inc. AFI American Filter Institute AGA American Gas Association AGC Associated General Contractors of America, Inc. AGMA American Gear Manufacturers Association AHAM Association of Home Appliance Manufacturers AHDGA American Hot Dip Galvanizers Association AIA American Institute of Architects 43 AIEE American Institute of Electrical Engineers AISC American Institute of Steel Construction AISI American Iron and Steel Institute ALS American Lumber Standards AMA Acoustical Materials Association AMCA Air Moving and Conditioning Association ANS American Nuclear Society ANSI American National Standards Institute APA American Plywood Association API American Petroleum Institute ARA American Railway Association AREA American Railway Engineering Association ARI Air Conditioning and Refrigeration Institute ASA Acoustical Society of America ASCE American Society of Civil Engineers ASHRAE American Society of Heating, Refrigerating and Air Conditioning Engineers ASLA American Society of Landscape Architects ASLE American Society of Lubricating Engineers ASME American Society of Mechanical Engineers ASQC American Society for Quality Control ASSE American Society of Sanitary Engineers ASTM American Society for Testing Materials AVATI Asphalt and Vinyl Asbestos Tile Institute AWI Architectural Woodwork Institute AWPA American Wood Preservers' Association AWPI American Wood Preservers' Institute AWS American Welding Society AWWA American Water Works Association BHMA B uilders Hardware Manufacturers Association CABRA Copper and Brass Research Association CDA Copper Development Association CEMA Conveyor Equipment Manufacturers Association CGA Compressed Gas Association CRSI Concrete Reinforcing Steel Institute CS Commercial Standards, U.S. Department of Commerce CSI Construction Specification Institute DCDMA Diamond Core Drill Manufacturers Association EIA Electronic Industries Association EPA Environmental Protection Agency FCI Fluid Controls Institute FGJA Flat Glass Jobbers Association FIA Factory Insurance Association FM Factory Mutual FMEC Factory Mutual Engineering Corporation FS Federal Specification FSPT Federation of Societies for Paint Technology FSS Federa l Specifications, General Services Administration FHWA Federal Highway Administration GA Gypsum Association IBI Insulation Board Institute IBR Institute of Boiler and Radiator Manufacturers IEEE Institute of Electric and Electronics Engineers IES Illuminating Engineering Society ILIA Indiana Limestone Institute of America, Inc. IME Institute of Makers of Explosives IP Institute of Petroleum (London) IPC Institute of Printed Circuits IPCEA Insulated Power Cable Engineers Association 44 ISA Instrument Society of America ISO International Organization for Standardization ITE Institute of Traffic Engineers LIA Lead Industries Association MBMA Metal Building Manufacturers Association MIA Marble Institute of America MLA Metal Lath Association MLMA Metal Lath Manufacturers Association MPTA Mechanical Power Transmission Association MRIS Maritime Research Information Service MS Military Specification MSDS Material Safety Data Sheet MSTD Military Standard NAAMM National Association of Architectural Metal Manufacturers NAFM National Association of Fan Manufacturers NBFU National Board of Fire Underwriters NBS National Bureau of Standards NCCLS National Committee for Clinical Laboratory Standards NCMA National Concrete Masonry Association NEC National Electrical Code NECA National Electrical Contractors Association, Inc. NEMA National Electrical Manufacturers Association NFC National Fire Code NFPA National Fire Protection Association NHLA National Hardware Lumber Association NLA National Lime Association NLGI National Lubricating Grease Institute NLMA National Lumber Manufacturers Association NMA National Microfilm Association NMWIA National Mineral Wool Insulation Association NPC National Plumbing Code NRCA National Roofing Contractors Association NRMCA National Ready Mixed Concrete Association NSF National Sanitation Foundation NTMA The National Terrazzo and Mosaic Association NWMA National Woodwork Manufacturers Association OSHA Occupational Safety and Health Act PCA Portland Cement Association PCI Prestressed Concrete Institute PDCA Painting and Decorating Council of America PEI Porcelain Enamel Institute PI Perlite Institute RIS Redwood Inspection Service RMA Rubber Manufacturers Association RTI Resilient Tile Institute RWMA Resistance Welder Manufacturers Association SAE Soci ety of Automotive Engineers SAMA Scientific Apparatus Makers Association SBI Steel Boiler Institute SCDHPT South Carolina Department of Highways and Public Transportation SCDOT South Carolina Department of Transportation SCPI Structural Clay Products Institute SCSHD South Carolina State Highway Department SDI Steel Deck Institute SIS Swedish Standards Association SJI Steel Joist Institute SMA Screen Manufacturers Association SMACNA Sheet Metal and Air Conditioning Contractors National 45 Ass ociation SPIB Southern Pine Inspection Bureau SPR Simplified Practice Recommendation, U. S. Department of Commerce SSBC Southern Standard Building Code SSGC Southern Standard Gas Code SSPC Steel Structures Painting Council TAPPI Technical Association of the Pulp and Paper Industry TCA Tile Council of America TRB Transportation Research Board UL Underwriter's Laboratories, Inc. USDA U.S. Department of Agriculture WWPA Western Wood Products Association 2. OWNER'S RIGHTS AND RESPONSIBILITIES: 2.1 CHANGES IN THE WORK: 2.1.1 The Owner, without invalidating the contract, may make changes in the work and in the Drawings and Specifications therefor by making alterations therein, additions thereto, or omissions therefrom. All work resulting from such changes shall be performed and furnished under and pursuant to the terms and conditions of the contract. If such changes result in an increase or decrease in the work to be done hereunder, or increase or decrease the quantities thereof, adjustment in compensation shall be made therefor as provided in Subsection 7.12 entitled PAYMENT FOR EXTRA WORK. 2.1.2 Except in an emergency endangering life or property, no change shall be made unless in pursuance of a written order from the Engineer authorizing the change, and no claim for additional compensation shall be valid unless the change is so ordered. 2.1.3 The Contractor agrees that he shall neither have nor assert any claim for, or be entitled to, any additional compensation for damages or for loss of anticipated profits on work that is eliminated. 2.2 PROJECT ENGINEER: 2.2.1 Frazier Engineering, P.A 6592 Bob White Trail Stanley, NC 28164 Phone: 704-822-8444 Fax: 704-822-8666 2.3 ENGINEER'S AUTHORITY: 2.3.1 The Engineer will be the Owner's representative periodically during the construction period and he will observe the work in progress on behalf of the Owner. The Engineer will have the authority to act on behalf of the Owner in the following matters consistent with the Owner's rights and obligations as set forth in these Contract Documents: 2.3.1.1 Interpretation of Contract Documents. 2.3.1.2 Approval of samples and shop drawings. 2.3.1.3 Preparation of supplementary details and instructions. 2.3.1.4 Inspection and approval of construction work. 46 2.3.1 .5 Preliminary approval of progress payment applications. 2.3.1.6 Review of television inspection logs and video tapes 2.3.2 Any instructions which the Engineer may issue the Contractor shall be adjudged an interpretation of the contract requirements and not an act of supervision. The Engineer has no authority, nor accepts any responsibility, either direct or implied, to direct and superintend the construction operations. 2.3.3 The Contractor shall proceed without delay to perform the work as directed, instructed, determined, or decided by the Engineer and shall comply promptly with such directions, instructions, determinations, or decisions. If the Contractor has any objection thereto, he may require that any such direction, instruction, determination, or decision be put in writing and within ten (10) days after receipt of any such writing, he may file a written protest with the Owner stating clearly and in detail his objections, the reasons therefor, and the nature and amount of additional compensation, if any, to which he claims he will be entitled thereby. A copy of such protest shall be filed with the Engineer at the same time as it is filed with the Owner. Unless the Contractor files such written protest with the Owner and Engineer within such ten (10) day period, he shall be deemed to have waived all grounds for protest of such direction, instruction, determination, or decision and all claims for additional compensation or damages occasioned thereby, and shall further be deemed to have accepted such direction, instructions, determination, or decision as being fair, reasonable, and finally determinative of his obligations and rights under the contract. 2.4 LIABILITY OF THE OWNER: 2.4.1 No person, firm or corporation, other than the Contractor, who signed this contract as such, shall have any interest herein or right hereunder. No claim shall be made or be valid either against the Owner or any agent of the Owner and neither the Owner nor any agent of the Owner shall be liable for or be held to pay any money, except as herein provided. The acceptance by the Contractor of the payment as fixed in the final estimate shall operate as and shall be a full and complete release of the Owner and of every agent of the Owner of and from any and all claims, demands, damages and liabilities, by or to the Contractor for anything done or furnished for or arising out of or relating to or by reason of the work or for or on account of any act or neglect of the Owner or of any agent of the Owner or of any other person, arising out of, relating to or by reason of the work, except the claim against the Owner for the unpaid balance, if any there be, of the amounts retained as herein provided. 2.5 RIGHTS-OF-WAY : 2.5.1 All work shall be performed within the existing sewer right-of-way and/or road-right-of-way as noted on the Drawings. The Contractor shall be responsible for gaining access to such rights-of-way and accessing sewers and manholes to perform the work including negotiating with property Owners, paying all costs for accessing sewers and manholes, and restoring all areas impacted by the Contractor’s construction operations. The Contractor shall not be entitled to make or assert claim for damage or a time extension due to accessing the existing rights-of-way. 2.6 SURVEYS, PERMITS AND REGULATIONS: 47 2.6.1 A ll surveying shall be the responsibility of the Contractor. The Owner will furnish bench marks for locating the principle component parts of the work. 2.6.2 Permits and licenses of a temporary nature necessary for the prosecution of the work shall be secured and paid for by the Contractor unless otherwise stated in the Special Provisions. Encroachment permits, easements for permanent structures and permits for permanent changes in existing facilities shall be secured and paid for by the Owner, unless otherwise specified. The Contractor shall give all notices and comply with all laws, ordinances, rules and regulations bearing on the conduct of the work as drawn and specified. If the Contractor observes that the Contract Documents are at variance therewith, he shall promptly notify the Engineer in writing, and any necessary changes shall be adjusted as provided in Subsection 2.1 entitled CHANGES IN THE WORK. 2.7 LINES, GRADES AND MEASUREMENTS: 2.7.1 The Contractor shall be responsible for setting all base lines and elevations necessary for performing the work. The Contractor shall employ a registered civil Engineer, or land surveyor and shall require said Engineer to establish all lines, elevations, reference marks, batter boards, etc., needed by the Contractor during the progress of the work, and from time to time to verify such marks by instrument or other appropriate means. 2.7.2 The Owner's Engineer shall be permitted at all times to check the lines, elevations, reference marks, batter boards, etc., set by the Contractor, who shall correct any errors in lines, elevations, reference marks, batter boards, etc., disclosed by such check. Such check shall not be construed to be an approval of the Contractor's work and shall not relieve or diminish in any way the responsibility of the Contractor for the accurate and satisfactory construction and completion of the entire work. 2.7.3 The Contractor shall make, check and be responsible for all measurements and dimensions necessary for the proper construction of, and the prevention of misfittings in, the work. 2.8 OWNER'S RIGHT OF AUDIT: 2.8.1 In case the Owner agrees that a Contractor perform work on a cost plus basis, the Owner is to have a full and complete right to audit and make copies of the Contractor's or subcontractor's records with respect to any payment the Owner may be requested to make, or may make, for any work done on a cost plus basis. 2.9 OWNER'S RIGHT TO SEPARATE CONTRACTS: 2.9.1 The Owner reserves the right to let other contracts in connection with the work under similar General Conditions. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate his work with theirs. 2.9.2 The Owner may perform additional work related to the project by himself, or he may let other contracts containing provisions similar to these. The Contractor will afford the other contractors who are parties to such contracts (or the Owner, if he is performing the additional work himself), reasonable opportunity for the introduction and storage of materials and equipment and the execution of work and shall properly connect and coordinate his work 48 with theirs. 2.10 OWNER'S RIGHT TO DO WORK: 2.10.1 If the Contractor should neglect to prosecute the work properly or fail to perform any provision of this contract, the Owner after three (3) days' written notice to the Contractor may, without prejudice to any other remedy he may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor. If such expense shall exceed the unpaid balance, the Contractor shall pay the difference to the Owner on demand. 2.10.2 The Engineer's certificate setting forth the fair and reasonable cost of repairing, replacing, rebuilding or restoring any damaged or defective work or equipment when performed by one other than the Contractor shall be binding and conclusive as to the amount thereof upon the Contractor. 2.11 OWNER'S RIGHT TO TERMINATE CONTRACT: 2.11.1 If the Contractor should be adjudged as bankrupt, or if he should make a general assignment for the benefit of his creditors, or if a receiver or trustee should be appointed on account of his insolvency, or if he should persistently or repeatedly refuse or should fail, except in cases for which extension of time is provided, to supply enough properly skilled workmen or proper materials, or if he should fail to make prompt payment to subcontractors or for material or labor, or persistently disregard laws, ordinances or the instructions of the Owner and his representatives, or otherwise be guilty of substantial violation of any provision of the contract, then the Owner, may, without prejudice to any other right or remedy and after giving the Contractor, and his surety, if any, seven (7) days' written notice, terminate the employment of the Contractor and take possession of the premises and of all materials, as it may deem expedient. In such case, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid balance of the contract price shall exceed the expense of finishing the work including compensation for additional engineering, managerial and administrative services, such excess shall be paid to the Contractor. If such expense shall exceed such unpaid balance, the Contractor shall pay the difference to the Owner. 2.12 SUSPENSION OF WORK, TERMINATION AND DELAY: 2.12.1 The Owner may suspend the work or any portion thereof for a period of not more than ninety (90) days or such further time as agreed upon by the Contractor, by written notice to the Contractor and the Engineer, which notice shall fix the date on which work shall be resumed. The Contractor shall resume that work on the day so fixed. The Contractor will not be allowed an increase in the contract price but may be due an extension of the contract time that is directly attributable to any suspension. 2.13 INSPECTIONS AND TESTING: 2.13.1 If the Contract Documents, Owner's instructions, laws, ordinances or any public authority having jurisdiction require any work to be specially tested or approved, the Contractor shall give the Owner timely notice of its readiness for observation by the Owner or inspection by another authority, and if the inspection is by another authority rather than the Owner, of the date fixed for such inspection. The required certificates of such inspection shall be secured by the Contractor. Observations by the Owner shall be promptly made, and where practicable, at the source of supply. If any work should be 49 cover ed up without approval or consent of the Owner, it must, if required by the Owner, be uncovered for examination, at the Contractor's expense. 2.14 INSPECTION OF WORK AWAY FROM THE SITE: 2.14.1 If the work to be done away from the construction site is to be inspected on behalf of the Owner during its fabrication, manufacture, or testing or before shipment, the Contractor shall give notice to the Engineer of the place and time where such fabrication, manufacture, testing, or shipping is to be done. Such notice shall be in writing and delivered to the Engineer in ample time so that the necessary arrangements for the inspection can be made. 2.15 PIPE LOCATION: 2.15.1 Exterior pipelines will be located substantially as indicated on the Drawings, but the right is reserved to the Owner acting through the Engineer, to make such modifications in location as may be found desirable to avoid interference with structures or for other reasons. Where fittings, etc., are noted on the Drawings such notation is for the Contractor's convenience and does not relieve him from laying and jointing different or additional items where required. 2.16 PRIOR USE OR OCCUPANCY: 2.16.1 The Owner reserves the right to use or occupy the work or portion thereof, and to use equipment installed under the contract, prior to final acceptance. Such use or occupancy will not constitute acceptance of the work or any part thereof. Despite such use or occupancy, guarantee periods will not begin until the completion of all work under the contract, unless agreement to the contrary is made in writing between the parties. 2.17 WEATHER CONDITIONS: 2.17.1 In the event of temporary suspension of work, or during inclement weather, or whenever the Engineer shall direct, the Contractor will, and will cause his subcontractors to, protect carefully his and their work and materials against damage or injury from the weather. If, in the opinion of the Engineer, any work or materials shall have been damaged or injured by reason of failure on the part of the Contractor or any of his subcontractors so to protect its work, such materials shall be removed and replaced at the expense of the Contractor. 2.18 OWNER'S RIGHT TO CLEAN UP: 2.18.1 If a dispute arises between the separate contractors as to their responsibility for cleaning up, the Contractor awarded the contract shall be responsible for the cleanup or the Owner may clean up and charge the cost thereof to the Contractor as the Engineer shall determine to be just. 3. CONTRACTOR'S RIGHTS AND RESPONSIBILITIES: 3.1 ACCESS TO WORK: 3.1.1 The Owner, the Engineer, and their officers, agents, servants, and employees plus representatives of the various participating Federal or State agencies may at any and all times and for any and all purposes, enter upon the work and site thereof and the premises used by the Contractor, and the Contractor shall at all times provide safe and proper facilities therefor. 50 3.2 ACCIDENT PREVENTION: 3.2.1 In the performance of the contract the Contractor shall comply with the applicable provisions of the regulations issued by the Secretary of Labor pursuant to section 107 of the Contract Work Hours and Safety Standards Act entitled "Safety and Health Regulations for Construction" (29 CFR Part 1518, renumbered as Part 1926). Occupational Safety and Health Standards (29 CFR Part 1910) issued by the Secretary of Labor pursuant to the Williams-Steiger Occupational Safety and Health Act of 1970 are applicable to work performed by the Contractor subject to the provisions of the Act. 3.3 STATED ALLOWANCES: 3.3.1 No allowances are included in the Contract Documents. 3.4 ARCHAEO LOGICAL RIGHTS: 3.4.1 There is a possibility that items of archaeological significance may be found during the excavation of the site. In such event, the Contractor shall stop excavation in the vicinity of the find and notify the Engineer immediately; subsequent excavation work shall proceed as directed by the Engineer. All items found which are considered to have archaeological significance are the property of the Owner. 3.5 OBLIGATIONS OF CONTRACTOR: 3.5.1 The Contractor shall and will, in good workmanlike manner, do and perform all work and furnish all supplies and materials, tools, machinery, equipment, transportation, supervision, temporary construction of any nature, and all other services, means and facilities except as herein otherwise expressly specified, necessary or proper to perform and complete all work required by this contract, within the time herein specified, in accordance with the provisions of this contract and in accordance with the Drawings and Specifications and in accordance with the direction of the Engineer as given from time to time during the progress of the work. He shall furnish, erect, maintain and remove such construction plants and such temporary works as may be required. 3.5.2 The Contractor shall observe, comply with, and be subject to all terms, conditions, requirements, and limitations of the contract and Specifications, and shall do, carry on, and complete the entire work to the satisfaction of the Engineer and the Owner. 3.5.3 The Contractor shall check all dimensions, elevations, quantities and instructions shown on the Drawings or given in the Specifications and shall notify the Engineer should any discrepancy of any kind be found in the Drawings, Specifications or conditions at the site. He will not be allowed to take advantage of any discrepancy, error or omission in the Contract Documents. If any discrepancy is discovered, the Engineer will issue full instructions pertaining thereto and the Contractor shall carry out these instructions as if originally specified. 3.6 CLAIMS FOR ADDITIONAL COST: 3.6.1 If the Contractor wishes to make a claim for an increase in the contract Sum, he shall give written notice thereof within twenty (20) days after the occurrence of the event giving rise to such claim. This notice shall be given by the Contractor before proceeding to execute the work, except in an 51 emergenc y endangering life or property, in which case the Contractor shall proceed in accordance with Subsection 3.28 entitled PROTECTION OF WORK, PROPERTY AND PERSONS IN AN EMERGENCY. No such claim shall be valid unless so made. If the Owner and the Contractor cannot agree on the amount of the adjustment in the contract Sum, it shall be determined by the Engineer. Any change in the contract sum resulting from such claim shall be authorized by Change Order. 3.7 CLAIMS FOR DAMAGES: 3.7.1 If the Contractor makes claim for any damages alleged to have been sustained by breach of contract or otherwise, he shall, within ten (10) days after occurrence of the alleged breach or within ten (10) days after such damages are alleged to have been sustained, whichever date is the earlier, file with the Engineer a written, itemized statement in triplicate of the details of the alleged breach and the details and amount of the alleged damages. The Contractor agrees that unless such a statement is made and filed as so required, his claim for damages shall be deemed waived, invalid and unenforceable, and that he shall not be entitled to any compensation for any such alleged damages. Within ten (10) days after the timely filing of such statement, the Engineer shall file with the Owner one copy of the statement together with his recommendations for action by the Owner. 3.7.2 The Contractor shall not be entitled to claim any additional compensation for damages by reason of any direction, instruction, determinations or decision of the Engineer, nor shall any such claims be considered, unless the Contractor shall have complied in all respects with the last paragraph of Subsection 2.3 entitled ENGINEER'S AUTHORITY, including, but not limited to, the filing of a written protest in the manner and within the time therein provided. 3.8 (NOT USED) 3.9 CLEANING UP: 3.9.1 The Contractor at all times shall keep the site of the work free from rubbish and debris caused by his operation under the contract. When the work has been completed, the Contractor shall remove from the site of the work all of his plant, machinery, tools, construction equipment, temporary work and surplus materials so as to leave the work and the site clean and ready for use. 3.9.2 All public streets adjacent to the site and all private ways at the site shall be kept clean of debris, spilled materials, and wet and dry earth at all times and shall be cleaned at the end of each working day. When wet earth is encountered, it shall be cleaned from the vehicles before they leave the site and enter streets and private ways. 3.10 NON-COM PLIANCE WITH CONTRACT REQUIREMENTS: 3.10.1 In the event the Contractor, after receiving written notice from the Engineer of non-compliance with any requirement of this contract, fails to initiate promptly such action as may be appropriate to comply with the specified requirement within a reasonable period of time the Owner shall have the right to order the Contractor to stop any or all work under the contract until the Contractor has complied or has initiated such action as may be appropriate to comply within a reasonable period of time. The Contractor will not be entitled to any extension of contract time or payment for any costs incurred as a result of being ordered to stop work for such cause. 52 3.11 OVERALL PROJECT COORDINATION: 3.11.1 The Contractor shall coordinate all work of his contract to produce the required finished project in accordance with the Contract Documents. The Contractor shall develop the detailed Project Schedule required under Paragraph 6 to include all required coordination required for completion of this Contract. Special attention shall be given to the submission of shop drawings, samples, color charts, and requests for substitution within the specified time; furnishing the proper shop drawings to subcontractors and material suppliers, whose work and equipment is affected by and related thereto; and the furnishing of all information concerning location, type, and size of built-in equipment and materials and equipment utilities. This coordination is in addition to all other coordination requirements called for in the technical documents of the Specifications. 3.12 COMMUNICATIONS: 3.12.1 The Contractor shall forward all communications to the Owner through the Engineer unless directed otherwise by the Engineer and/or Owner. 3.13 NO DISCRIMINATION IN EMPLOYMENT: 3.13.1 In connection with the performance of work under this contract, the Contractor agrees not to discriminate against any employee or applicant for employment because of race, religion, color or national origin. The aforesaid provision shall include, but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. 3.14 AS-BUILT DRAWINGS: 3.14.1 The Contractor shall designate one set of Drawings for "As-Built Drawings." The Contractor shall indicate on these drawings all field changes and the location of each service lateral reconnected, the address and the locations as actually installed. The "As-Built Drawings" shall be kept current by the Contractor. The "As-Built Drawings" shall be delivered to the Engineer within 3 days of Substantial Completion. The Engineer will review the “As- Built Drawings” for completeness and accuracy and will forward all deficiencies required for correction to the Contractor within 21 days from receipt. The Contractor shall correct and address all comments and deficiencies identified by the Engineer and shall submit the corrected “As- Built Drawings” prior to submittal of the final Application for Payment. The Engineer will again review the “As-Built Drawings” for completeness and accuracy and will forward additional deficiencies and comments to the Contractor for correction. Final payment shall not be made until the "As- Built Drawings" are completed, approved by the Engineer and accepted by the Owner. 3.15 DRAWING S AND SPECIFICATIONS AT THE SITE: 3.15.1 The Contractor shall maintain at the site one complete set of all Drawings, Specifications, Addenda, approved Shop Drawings, Change Orders and other Modifications, in good and readable condition. These shall be available to the Engineer. 3.16 EMPLOY COMPETENT PERSONS: 53 3.16.1 T he Contractor shall endeavor to employ only competent persons on the work. Whenever the Engineer notifies the Contractor in writing that in his opinion any person on the work is incompetent, unfaithful, disorderly, or otherwise unsatisfactory, or not employed in accordance with the provisions of the contract, such person shall be discharged from the work and shall not again be employed on it, except with the written consent of the Engineer. 3.17 EMPLOY SUFFICIENT LABOR AND EQUIPMENT: 3.17.1 If, in the judgement of the Engineer, the Contractor is not employing sufficient labor, plant, equipment or other means to complete the work within the time specified, the Engineer may, after giving written notice, require the Contractor to employ such additional labor, plant, equipment and other means as the Engineer may deem necessary to enable the work to progress properly. 3.18 EXISTING STRUCTURES: 3.18.1 Where the dimensions and locations of existing structures are of importance in the installation or connection of any part of the work, the Contractor shall verify such dimensions and locations in the field before the fabrication of any material or equipment which is dependent on the correctness of such information. 3.19 INDE MNIFICATION: 3.19.1 The Contractor will indemnify and hold harmless the Owner and the Engineer and their agents and employees from and against all claims, damages, losses and expenses, including attorneys' fees, arising out of or resulting from the performance of the work, provided that any such claim, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property including the loss of use resulting therefrom; and is caused in whole or in part by any negligent or willful act or omission of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable. 3.19.2 In any and all claims against the Owner and the Engineer, or any of their agents or employees, by any employee of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligation shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any subcontractor under workmen's compensation acts, disability benefit acts or other employee benefits acts. 3.20 DRUG FRE E ENVIRONMENT: 3.20.1 The Contractor shall not sell and shall neither permit nor suffer the introduction or use of intoxicating liquors upon or about the work. 3.21 LEGAL ADDRESS OF CONTRACTOR: 3.21.1 The Contractor's business address and his office at or near the site of the work are both hereby designated as places to which communications may be delivered. The depositing of any letter, notice, or other communication in a postpaid wrapper directed to the Contractor's business address in a post office box regularly maintained by the U. S. Postal Service or the delivery at either designated address of any letter, notice, or other communication by 54 mail or otherwise shall be deemed sufficient service thereof upon the Contractor, and the date of such service shall be the date of receipt. The first-named address may be changed at any time by an instrument in writing, executed and acknowledged by the Contractor and delivered to the Engineer. Service of any notice, letter or other communication upon the Contractor personally shall likewise be deemed sufficient service. 3.22 MUTUAL RESPONSIBILITY OF CONTRACTORS: 3.22.1 The Contractor shall afford other contractors responsible opportunity for the introduction and storage of their materials and equipment and the execution of their work, and shall properly connect and coordinate his work with theirs. 3.22.2 If any part of the Contractor's work depends for proper execution or results upon the work of any other separate contractor, the Contractor shall inspect and promptly report to the Owner any apparent discrepancies or defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor so to inspect and report shall constitute an acceptance of the other contractor's work as fit and proper to receive his work, except as to defects which may develop in the other separate contractor's work after the execution of the Contractor's work. To ensure proper execution of the subsequent work, the Contractor shall measure work already in place and shall at once report to the Owner any discrepancy between the executed work and the Contract Documents. 3.22.3 Should the Contractor cause damage to any separate contractor on the work, the Contractor agrees, upon due notice to settle with such contractor by agreement or arbitration, if he will so settle. If such separate contractor sues the Owner on account of any damage alleged to have been so sustained, the Owner shall notify the Contractor, who shall defend such proceedings at the Contractor's expense, and if any judgement against the Owner arises therefrom, the Contractor shall pay or satisfy it and pay all costs incurred by the Owner. 3.23 NIGHT AND WEEKEND WORK: 3.23.1 No work shall be done at night or on weekends except: 3.23.1.1 Usual protective work, such as pumping and the tending of lights; 3.23.1.2 Work done in case of emergency threatening injury to persons or property; 3.23.1.3 When provided for under Special Provisions as herein specified; 3.23.1.4 If all of the conditions set forth in the next paragraph below are met. 3.23.2 No work other than that included in (3.23.1.1), (3.23.1.2). and (3.23.1.3) above, shall be done at night except when: 3.23.2.1 In the judgement of the Engineer, the work will be of advantage to the Owner and can be performed satisfactorily at night; 3.23.2.2 The work will be done by a crew organized for regular and continuous night work; 3.23.2.3 The Engineer has given written permission for such night work. 55 3.23.3 A ny work necessary to be performed after regular hours, on weekends, or Legal Holidays, shall be performed without additional expense to the Owner. 3.24 OCCUPYING PRIVATE LAND: 3.24.1 The Contractor shall not (except after written consent from the property parties) enter or occupy with men, tools, materials, or equipment, any land outside the rights-of-way or property of the Owner. A copy of the written consent shall be given to the Engineer prior to occupation of private land. 3.25 PERMITS AND RESPONSIBILITIES: 3.25.1 The Contractor shall, without additional expense to the Owner, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable Federal, State and municipal laws, codes, and regulations, in connection with the prosecution of the work. He shall be similarly responsible for all damages to persons or property that occur as a result of his fault or negligence. He shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire construction work, except for any completed unit of construction thereof which theretofore may have been accepted. 3.26 PRECAUTIONS DURING ADVERSE WEATHER: 3.26.1 During adverse weather and against the possibility thereof, the Contractor shall take all necessary precautions so that the work may be properly done and satisfactory in all respects. When required, protection shall be provided by use of tarpaulins, wood shelters, or other approved means. 3.26.2 During cold weather, materials shall be preheated, if required, and the materials and adjacent structure into which they are to be incorporated shall be made and kept sufficiently warm so that a proper bond will take place and a proper curing, aging, or drying will result. Protected spaces shall be artificially heated by approved means which will result in a moist or dry atmosphere according to the particular requirements of the work being protected. Ingredients for concrete and mortar shall be sufficiently heated so that the mixture will be warm throughout when used. 3.26.3 The Engineer may suspend construction operations at any time when, in his judgement, the conditions are unsuitable or the proper precautions are not being taken, whatever the weather may be, in any season. The Contractor agrees that he shall not have or assert any claim for or be entitled to any additional compensation or damages on account of any such suspension. 3.27 PROTECTION OF WORK, PROPERTY AND PERSONS: 3.27.1 The Contractor will be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the work. He will take all necessary precautions for the safety of, and will provide the necessary protection to prevent damage, injury or loss to all employees on the work and other persons who may be affected thereby, all the work and all materials or equipment to be incorporated therein, whether in storage on or off the site, and other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. 3.27.2 The Contractor will comply with all applicable laws, ordinances, rules, regulations and orders of any public body having jurisdiction. He will erect 56 and maint ain as required by the conditions and progress of the work, all necessary safeguards for safety and protection. He will notify Owners of adjacent utilities when prosecution of the work may affect them. The Contractor will remedy all damage, injury or loss to any property caused, directly or indirectly, in whole or in part, by the Contractor, any subcontractor or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, except damage or loss attributable to the fault of the Contract Documents or to the acts or omissions of the Owner or the Engineer or anyone employed by either of them or anyone for whose acts either of them may be liable and not attributable, directly or indirectly, in whole or in part, to the fault or negligence of the Contractor. 3.28 PROTECTION OF WORK, PROPERTY AND PERSONS IN AN EMERGENCY: 3.28.1 In emergencies affecting the safety of persons or the work or property at the site or adjacent thereto, the Contractor, without special instruction or authorization from the Engineer or Owner, shall act to prevent threatened damage, injury or loss. He will give the Engineer prompt Written Notice of any significant changes in the work or deviations from the Contract Documents caused thereby, and a Change Order shall thereupon be issued covering the changes and deviations involved. 3.29 PROTECTION AGAINST WATER AND STORM: 3.29.1 The Contractor shall take all precautions necessary to prevent damage to the work by storms or by water entering the site of the work directly or through the ground. In case of damage by storm or water, the Contractor shall at his own cost and expense make such repairs or replacements or rebuild such parts of the work as the Engineer may require in order that the finished work may be completed as required by the contract. 3.30 PROTECTION OF EXISTING VEGETATION, STRUCTURES, UTILITIES AND IMPROVEMENTS: 3.30.1 The Contractor will preserve and protect all existing vegetation such as trees, shrubs and grass on or adjacent to the site of the work which is not to be removed and which does not reasonably interfere with the construction work. Care shall be taken in removing trees authorized for removal to avoid damage to vegetation to remain in place. Any limbs or branches of trees broken during such operations or by the careless operation of equipment or by workmen, shall be trimmed with a clean cut and painted with an approved tree pruning compound as approved by the Engineer. 3.30.2 The Contractor will protect from damage all existing improvements or utilities at or near the site of the work, the location of which is made known to him, and will repair or restore any damage to such facilities resulting from failure to comply with the requirements of this contract or the failure to exercise reasonable care in the performance of the work. If the Contractor fails or refuses to repair any such damage promptly, the Owner may have the necessary work performed and charge the cost thereof to the Contractor. 3.30.3 The Contractor shall protect trees adjacent to his work and not to be cut, with substantial barriers of such height as may be necessary to protect the trees from injury from piled material, from equipment, from his operation, or otherwise due to his work. Excavating machinery and cranes shall be of suitable type and shall be operated with care to prevent injury to trees not to be cut and particularly to overhanging branches and limbs. 57 3.30.4 O n paved surfaces, the Contractor shall not use or operate tractors, bulldozers or other power operated equipment, tire treads or wheels of which are so shaped as to cut or otherwise injure such surfaces. 3.31 RESTORATION OF PROPERTY: 3.31.1 All existing surfaces, including lawns, grassed and planted areas which have been injured by the Contractor's operations shall be restored to a condition at least equal to that in which they were found immediately before work was begun. Suitable materials and methods shall be used for such restoration. All restored plantings shall be maintained by cutting, trimming, fertilizing, etc., until acceptance. The restoration of existing property or structures shall be done as promptly as practicable and not be left until the end of the construction period. 3.32 INTERFERENCE WITH AND PROTECTION OF STREETS: 3.32.1 The Contractor shall not close or obstruct any portion of a street, road, or private way without obtaining permits therefor from the proper authorities. If any street, road or private way shall be rendered unsafe by the Contractor's operations, he shall make such repairs or provide such temporary ways or guards as shall be acceptable to the proper authorities. 3.32.2 Streets, roads, private ways and walks not closed shall be maintained passable and safe by the Contractor, who shall assume and have full responsibility for the adequacy and safety of provisions made therefor. 3.32.3 The Contractor shall, at least twenty-four (24) hours in advance, notify the highway, police and fire departments in writing, with a copy to the Engineer, if the closure of a street or road is necessary. The Contractor shall also place an advertisement in The Index Journal at least one day prior to the closing to provide details of the closing to the public, including the appropriate detour routes. The Contractor shall cooperate with the police department in the establishment of alternate routes and shall provide adequate detour signs, plainly marked and well lighted, in order to minimize confusion. 3.33 TRAFFIC CONTROL: 3.33.1 Where control of traffic is required for public safety, the Contractor shall provide an adequate number of flagmen employed at his own expense. 3.34 CONSTRUCTION DRAINAGE: 3.34.1 The Contractor shall furnish all labor, materials and necessary equipment for the temporary control of surface water and seepage water during construction and keep all excavations, pits and trenches free from water at all times. 3.34.2 The Contractor shall furnish and operate pumps and other equipment required. Dikes and ditches shall be constructed around excavations and elsewhere as necessary to prevent surface water from flooding the excavations or standing in areas adjacent to excavations, in work areas or in material storage areas. The Contractor shall take all necessary precautions to protect adjacent areas and properties from damage. He shall not divert water onto adjacent areas and properties at points other than that which would be considered the natural flow, prior to construction, without the expressed consent of the Owner in writing with a copy to the Engineer. He shall take steps to prevent the erosion of soil, earth and other material and 58 the con duction of the eroded materials onto adjacent properties and shall be responsible for the removal of such materials and the restoration of adjacent areas to their original condition. 3.35 RETURN OF DRAWINGS: 3.35.1 All copies of Drawings, Specifications and other Documents furnished by the Owner or the Engineer to the Contractor may be used only in connection with the prosecution of the work and shall be returned by the Contractor upon completion of the work. 3.36 SITE INVESTIGATION: 3.36.1 The Contractor acknowledges that he has investigated and satisfied himself as to the conditions affecting the work, including but not restricted to those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electric power, roads and uncertainties of weather, river stages, tides or similar physical conditions at the site, the confirmation and conditions of the ground, the character of equipment and facilities needed preliminary to and during the prosecution of the work. The Contractor further acknowledges that he has satisfied himself as to the character, quality and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Owner, as well as from information presented by the Drawings and Specifications made a part of the contract. Any failure by the Contractor to acquaint himself with the available information will not relieve him from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Owner assumes no responsibility for any conclusions or interpretations made by the Contractor on the basis of the information made available by the Owner. 3.37 SOIL EROSION AND SEDIMENT CONTROL: 3.37.1 The Contractor's attention is directed to the fact that unless exposed earth areas are properly cared for during construction, they may result in substantial sedimentation damage downstream from the construction area. The Contractor shall be responsible for conducting his site grading and drainage operations in such manner as to prevent excessive soil erosion of the construction site work areas. He shall at all times provide satisfactory means to prevent the movement and washing of soil onto pavements or into adjacent ditches, swales, inlets and drainage pipes, to avoid the possibility of these structures becoming clogged with soil. He shall promptly repair all areas which may become eroded and shall clear drainage ditches, swales and structures of siltation. 3.38 SUBSURFACE CONDITIONS: 3.38.1 The Contractor shall promptly, and before such conditions are disturbed, except in the event of an emergency, notify the Owner by Written Notice of: 3.38.1.1 Subsurface or latent physical conditions of the site differing materially from those indicated in the Contract Documents. 3.38.1.2 Unknown physical conditions at the site, of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents. 59 3.38.2 T he Owner shall promptly investigate the conditions, and if he finds that such conditions do so materially differ and cause an increase or decrease in the cost of, or in the time required for, performance of the work, an equitable adjustment shall be made and the Contract Documents shall be modified by a Change Order. Any claim of the Contractor for adjustment hereunder shall not be allowed unless he has given the required Written Notice; provided that the Owner may, if he determines the facts so justify, consider and adjust any such claims asserted before the date of the final payment. 3.39 SUBCONTRACTING: 3.39.1 The Contractor may utilize the services of specialty subcontractors on those parts of the work which, under normal contracting practices, are performed by specialty subcontractors. The Contractor shall, without additional expense to the Owner, utilize the services of specialty subcontractors on those parts of the work which are specified to be performed by specialty subcontractors. 3.39.2 The Contractor shall not award any work to any subcontractor without prior written approval of the Owner, which approval will not be given until the Contractor submits to the Owner a written statement concerning the proposed award to the subcontractor, which statement shall contain such information as the Owner may require. No request for payment will be approved before this list has been received and reviewed by the Owner. The Owner reserves the right to reject subcontractors based on their experience and past experience for the Owner. 3.39.3 The Contractor shall not award work to subcontractor(s), in excess of fifty percent (50%) of the contract price, without prior written approval of the Owner. 3.39.4 The Contractor shall be fully responsible to the Owner for the acts and omissions of his subcontractors, and of persons either directly or indirectly employed by them, as he is for the acts and omissions of persons directly employed by him. 3.39.5 The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to bind subcontractors to the Contractor by the terms of the Contract Documents insofar as applicable to the work of subcontractors and to give the Contractor the same power as regards terminating any subcontract that the Owner may exercise over the Contractor under any provisions of the Contract Documents. 3.39.6 If any other contractor or any subcontractor of any such other contractor shall suffer or claim to have suffered loss, damage or delay by reason of the acts or omissions of the Contractor or of any of his subcontractors, the Contractor agrees to assume the defense against any such claim and to reimburse such other contractor or subcontractor for such loss or damage. The Contractor agrees to and does hereby indemnify and save harmless the Owner from and against any and all claims by such other contractors or subcontractors alleging such loss, damage or delay and from and against any and all claims, demands, costs and expenses, including attorneys' fees, arising out of, relating to or resulting from such claims, 3.39.7 The Contractor shall be responsible for the coordination of the trades, subcontractors and material men engaged upon his work. The Owner or Engineer will not undertake to settle any differences between the Contractor and his subcontractors or between subcontractors. If any subcontractor on the project, in the opinion of the Owner, proves to be incompetent or 60 otherw ise unsatisfactory, he shall be replaced if and when directed in writing by the Engineer. 3.39.8 Nothing contained in this contract shall create any contractual relation between any subcontractor and the Owner. 3.40 SUPERVISION: 3.40.1 The Contractor shall keep on his work, during its progress, a competent superintendent and any necessary assistants, all satisfactory to the Owner. The superintendent shall not be changed except with the consent of the Owner, unless the superintendent proves to be unsatisfactory to the Contractor and ceases to be in his employ. The superintendent shall represent the Contractor in his absence and all directions given to him shall be as binding as if given to the Contractor. Important directions shall be confirmed in writing to the Contractor. Other directions shall be so confirmed on written request in each case. The Owner shall not be responsible for the acts or omissions of the superintendent or his assistants. 3.40.2 The Contractor shall give efficient supervision to the work, using his best skill and attention. He shall carefully study and compare all Drawings, Specifications and other instructions and shall at once report to the Owner any error, inconsistency or omission which he may discover. 3.41 TAXES: 3.41.1 The Contractor shall promptly pay all Federal, State and local taxes which may be assessed against him in connection with the work or his operations under the Agreement and/or the other Contract Documents, including, but not limited to, taxes attributable to the purchase of materials and equipment, to the performance of services and the employment of persons in the prosecution of the work. 3.42 TEMPORARY HEAT: 3.42.1 The Contractor shall provide temporary heat whenever necessary to protect all work and materials against injury from dampness and cold and to dry out moisture from the building. Fuel, equipment and method of heating shall be satisfactory to the Owner's Insurer and the Engineer. 3.42.2 Temporary heating apparatus shall be installed and operated in such a manner that finished work will not be damaged thereby. 3.43 SANITARY FACILITIES: 3.43.1 The Contractor shall provide adequate sanitary facilities for the use of those employed on the work. Such facilities shall be made available when the first employees arrive on the site of the work, shall be properly secluded from public observation, and shall be constructed and maintained during the progress of the work in suitable numbers and at such points and in such a manner as may be required or approved. The Contractor shall maintain the sanitary facilities in a satisfactory and sanitary condition at all times and shall enforce their use. He shall rigorously prohibit the committing of nuisances on the site of the work, on lands of the Owner or on adjacent property. The Owner and the Engineer shall have the right to inspect such facilities at all times to determine whether or not they are being properly and adequately maintained. 3.44 TEMPORARY UTILITIES: 61 3.44.1 T he Contractor shall make arrangements for and furnish as a part of the contract, all electricity, water, lighting and other utilities needed to do the work called for by the contract. Any separate contractors having a contract with the Owner shall make arrangements for and share the cost with the Contractor for the use of the required utilities on a pro rata schedule based on an agreed basis. All electrical work shall comply with the National Electric Code. 3.44.2 The Contractor shall provide and pay for all temporary wiring, switches, connections and meters. The Contractor shall provide sufficient electric lighting so that all work may be done in a workmanlike manner when there is not sufficient daylight. 3.45 UNCOVE RING AND CORRECTION OF WORK: 3.45.1 The Engineer shall be furnished by the Contractor with every reasonable facility for examining and inspecting the work and for ascertaining that the work is being performed in accordance with the requirements and intent of the contract, even to the extent of requiring the uncovering or taking down of portions of finished work by the Contractor. 3.45.2 Should the work thus uncovered or taken down prove satisfactory, the cost of uncovering or taking down and the replacement thereof shall be considered as extra work unless the original work was done in violation of the contract in point of time or in absence of the Engineer or his inspector and without his written authorization, in which case said cost shall be borne by the Contractor. Should the work uncovered or taken down prove unsatisfactory, said cost shall likewise be borne by the Contractor. 3.45.3 The inspection of the work shall not relieve the Contractor of any of his obligations to perform and complete the work as required by the contract. Defective work shall be corrected and unsuitable materials, equipment, apparatus and other items shall be replaced by the Contractor, notwithstanding that such work, materials, equipment, apparatus and other items may have been previously overlooked or accepted or estimated for payment. If the work or any part thereof shall be found defective at any time before the final acceptance of the work, the Contractor shall forthwith make good such defect in a manner satisfactory to the Engineer; if any materials, equipment, apparatus or other items brought upon the site for use or incorporation in the work, or selected for the same, are condemned by the Engineer as unsuitable or not in conformity with the Specifications or any of the other Contract Documents, the Contractor shall forthwith remove such materials, equipment, apparatus and other items from the site of the work and shall at his own cost and expense make good and replace the same and any material furnished by the Owner which shall be damaged or rendered defective by the handling or improper installation by the Contractor, his agents, servants, employees or subcontractors. 3.45.4 If the Owner deems it inexpedient to correct work not in accordance with the contract, an equitable deduction from the contract price shall be made therefor. 3.46 COOPERATION WITH UTILITIES: 3.46.1 The Owner will notify all utility companies, all pipe line Owners or other parties affected, and endeavor to have all necessary adjustments of the public or private utility fixtures, pipe lines and other appurtenances within or adjacent to the limits of construction, made as soon as practicable. 62 3.46.2 W ater lines, gas lines, wire lines, sewer lines, water and gas meter boxes, water and gas valve boxes, manholes, light standards, cableways, signals and all other utility appurtenances within the limits of the proposed construction which are to be relocated or adjusted are to be moved by the Owner under separate agreement, except as otherwise provided for in the Special Provisions or as noted on the Drawings. 3.46.3 The Drawings will show all known utilities located within the limits of the contract according to information obtained. The accuracy of the Drawings in this respect is not guaranteed by the Owner. The Contractor shall have considered in his bid all of the permanent and temporary utility appurtenances in their present or relocated position. No additional compensation will be allowed for any delays, inconveniences or damages sustained by him due to any interference from the said utility appurtenances or the operation of moving them. 3.46.4 Unless otherwise provided, the cost of temporary rearrangement of utilities made only in order to facilitate the construction of the work will be borne by the Contractor. 3.47 VERIFICATION OF DIMENSIONS AND ELEVATIONS: 3.47.1 Dimensions and elevations indicated on the Drawings in reference to existing structures, location of utilities, sewer inverts or other information on existing facilities, are the best available data obtainable but are not guaranteed by the Engineer. The Engineer will not be responsible for their accuracy. Before proceeding with any work dependent upon the data involved, the Contractor shall field check and verify all dimensions, grades, inverts, lines, elevations or other conditions of limitations at the site of the work to avoid construction errors or damage to existing facilities. If any work is performed by the Contractor, or any subcontractors, prior to adequate verification of applicable data, any resultant extra cost for adjustment of work necessary to conform to existing conditions, or damage to existing facilities, shall be assumed by the Contractor without reimbursement or compensation by the Owner. 3.47.2 If the Contractor, in the course of the work, finds any discrepancy between the Drawings and the physical conditions of the locality, or any errors or omissions in Drawings or in the layout as given by survey points and instructions, he shall immediately inform the Engineer in writing. The Engineer will promptly investigate the reported conditions and issue such instructions as may be necessary for the proper execution of the work. Any work done after such discovery and prior to receipt of such instructions shall be at the risk of the Contractor. 4. MATERIALS, EQUIPMENT AND WORKMANSHIP: 4.1 CHEMI CAL USAGE: 4.1.1 All chemicals used during project construction or furnished for project operation, whether herbicide, pesticide, disinfectant, polymer, reactant or of other classification, shall show approval of either EPA or U.S.D.A. The use of all such chemicals and disposal of residues shall be in strict conformance with manufacturer and U.S.D.A. instructions. The Contractor shall provide a MSDS for all chemicals or products used during the project prior to the use of such material. 4.2 CONTRACTOR'S TITLE TO MATERIALS: 63 4.2.1 N o materials or supplies for the work shall be purchased by the Contractor or by any subcontractor subject to any chattel mortgage or under a conditional sale contract or other agreement by which an interest is retained by the seller. The Contractor warrants that he has good title to all materials and supplies used by him, in the work, free from all liens, claims or encumbrances. 4.3 CORRECTION OF WORK BEFORE COMPLETION: 4.3.1 The Contractor shall promptly remove from the premises all work condemned by the Owner as failing to conform to the Contract Documents, whether incorporated or not and the Contractor shall promptly replace and re-execute his own work in accordance with the contract and without expense to the Owner and shall bear the expense of making good all work of other contractors destroyed or damaged by such removal or replacement. The fact that the Engineer may have previously overlooked such defective work shall not constitute an acceptance of any part of it. 4.3.2 If the Contractor does not remove such condemned work within a reasonable time, fixed by written notice, the Owner may remove it, and after storing it at the job site for thirty (30) days, due written notice thereof being given the Contractor, the Owner may offer the material for sale and removal from the premises. Net proceeds from such sale shall be for the Contractor's credit against the "Owner's Right to Do Work." If the material has no sale value, the Owner may remove it from the premises and/or otherwise dispose of it. The costs of such disposition shall be deducted from payments to the Contractor as provided in Subsection 2.10 entitled OWNER'S RIGHT TO DO WORK. 4.4 CORRECTION OF WORK AFTER COMPLETION: 4.4.1 The Contractor shall remedy any defects due to faulty materials or workmanship and pay for any damage to other work resulting therefrom which shall appear within a period of one (1) year from the date of final acceptance of the work except where longer periods are specified and in accordance with the terms of any special guarantees provided in the contract. The Owner will give notice of observed defects with reasonable promptness. 4.5 CORRECTIONS OF WORK AFTER GUARANTEE PERIOD: 4.5.1 It shall be the responsibility of the Contractor to permanently correct all defective items called to his attention within the guarantee period, whether such correction be made within the guarantee period or not. The contract shall not be fully performed until such permanent corrections are made. 4.6 GENERAL GUARANTY: 4.6.1 The Contractor warrants to the Owner that all materials and equipment furnished under this contract will be new unless otherwise specified, and that all work will be of good quality, free from faults and defects and in conformance with the Contract Documents. All work not so conforming to these standards may be considered defective. If required by the Owner, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. 4.6.2 Neither the final certificate of payment nor any provision in the Contract Documents nor partial or entire occupancy of the premises by the Owner 64 shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects in the work and pay for any damage to other work resulting therefrom, which shall appear within a period of one (1) year from the date of final acceptance of the work, except where longer periods are specified. The Owner will give notice of observed defects with reasonable promptness. If the Contractor shall fail to repair, replace, rebuild or restore such defective or damaged work or equipment promptly after receiving notice, the Owner shall have the right to have the work done by others in the same manner as is provided for in Subsection 2.10, OWNERS RIGHT TO DO WORK. 4.6.3 The Contractor shall further guarantee for a period of one (1) year that any building or buildings, constructed under this project, shall be watertight and leakproof at every point and in every area, except where leaks can be attributed to damage to the building by external forces other than storm or foundation settlement. He shall, immediately upon notification by the Owner of water penetration, determine the source of water penetration and, at his own expense, do any work necessary to make the building watertight. He shall also, at his own expense, repair or replace any other damaged material to return the building or buildings to the original accepted condition. 4.6.4 In addition to the foregoing stipulations, the Contractor shall comply with all other guarantees and warranties referred to in any portions of the Contract Documents, the more stringent requirement governing. Unless otherwise specifically stated elsewhere in these Specifications, the date of beginning of all guarantee or warranty periods shall be the date of acceptance of the project. 4.6.5 If for any reason, the Contractor cannot guarantee any part of his work using material or construction methods which have been specified, or shown, he shall notify the Engineer in writing before contracts are signed, giving reasons together with the name of product and data on substitutions he can guarantee. Should the Contractor fail to so notify the Engineer prior to the signing of contracts, he will be held to have agreed to guarantee all work specified or shown. 4.7 HANDLING AND DISTRIBUTION: 4.7.1 The Contractor shall handle, haul and distribute all materials and all surplus materials on the different portions of the work as necessary or required; shall provide suitable and adequate storage room for materials and equipment during the progress of the work, and be responsible for the protection, loss of or damage to materials and equipment furnished by him, until the final completion and acceptance of the work. 4.7.2 Storage and demurrage charges by transportation companies and vendors shall be borne by the Contractor. 4.8 MANUFACTURER'S DIRECTIONS: 4.8.1 All manufactured articles, material and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned as directed by the manufacturers, unless herein specified to the contrary. 4.9 MATERIALS, SERVICES AND FACILITIES: 4.9.1 It is understood that, except as otherwise specifically stated in the Contract 65 Docume nts, the Contractor shall provide and pay for all labor, supplies and materials, tools, machinery, equipment, transportation, supervision, temporary construction of any nature and all other services, means and facilities of any nature whatsoever necessary to execute, complete and deliver the work within the specified time. 4.9.2 Materials and equipment shall be so stored as to insure the preservation of their quality and fitness for the work. Stored materials and equipment to be incorporated in the work shall be located so as to facilitate prompt inspection. 4.9.3 Materials, supplies and equipment shall be in accordance with samples submitted by the Contractor and approved by the Engineer. 4.10 MISCELLANEOUS ITEMS: 4.10.1 The work to be done by the Contractor, specified and enumerated under this contract, shall include any minor details of the work not specifically mentioned in the Specifications or shown on the Drawings, but obviously necessary for the proper completion of the work, which shall be considered incidental and as being a part of and included with the work for which prices are given in the bid. The Contractor will not be entitled to any additional compensation therefor. 4.10.2 Miscellaneous items and accessories which are not specifically mentioned, but which are essential to produce a complete and properly operating installation or usable structure or plant, providing the indicated function, shall be furnished and installed without change in the contract price. Such miscellaneous items and accessories shall be of the same quality standards, including material, style, finish, strength, class, weight and other applicable characteristics as specified for the major component of which the miscellaneous item or accessory is an essential part, and shall be approved by the Engineer before installation. The above requirement is not intended to include major components not covered by or inferable from the Drawings and Specifications. 4.11 MISTAKES OF CONTRACTOR: 4.11.1 The Contractor shall promptly correct and make good any and all defects, damages, omissions or mistakes, for which he and/or his agents, servants, employees or subcontractors are responsible, and he shall pay to the Owner all costs, expenses, losses and damages resulting therefrom or by reason thereof as determined by the Engineer. 4.12 PROTECTION AGAINST ELECTROLYSIS: 4.12.1 Where dissimilar metals are used in conjunction with each other, or against concrete surfaces, suitable insulation shall be provided between adjoining surfaces so as to eliminate direct contact and any resultant electrolysis. The insulation shall be bituminous impregnated felt, heavy bituminous coatings, nonmetallic separators or washers, or other approved materials. 4.13 RIGHT TO MATERIALS: 4.13.1 Nothing in the contract shall be construed as vesting in the Contractor any right of property in the materials, equipment, apparatus and other items furnished after they have been installed or incorporated in or attached or affixed to the work or the site, but all such materials, equipment, apparatus and other items shall, upon being so installed, incorporated, attached or 66 affi xed, become the property of the Owner. 4.14 ROYALTIES AND PATENTS: 4.14.1 The Contractor shall pay all applicable royalties and license fees. He shall defend all suits or claims for infringement of any patent rights and shall save the Owner harmless from loss on account thereof, except that the Owner shall be responsible for all such loss when a particular process or the product of a particular manufacturer or manufacturers is specified, but if the Contractor has information that the process or article specified is an infringement of a patent, he shall be responsible for such loss unless he promptly gives such information to the Owner in writing. 4.15 SUBMITTAL SCHEDULE: 4.15.1 Within twenty (20) days after execution and delivery of the contract, the Contractor shall prepare and deliver to the Engineer a Submittal Schedule. This includes a list of all submittals required under the contract. The list shall identify each major group of shop drawings, coordination drawings and schedules and each sample and the planned submission date for each. 4.15.2 After the Engineer's review of the list of submittals, the Engineer will meet with the Contractor for a joint review and correction and adjustment, as necessary, for agreement on the submittal. In addition, at the meeting the duration of the review period for each submittal will be established. The Contractor's planned submission date for each submittal shall allow no less than fifteen (15) working days for review and appropriate action before approval of the submittal becomes critical to the progress of the Contractor's work. Within five (5) calendar days after the joint review, the Contractor shall make any necessary revisions to the list of submittals, including durations of the review periods, in accordance with the agreements reached during the joint review and submit two (2) revised copies to the Engineer. No application for partial payment will be approved until the submitted schedule is approved. 4.16 SHOP DRAWINGS: 4.16.1 Shop Drawings are drawings, diagrams, illustrations, schedules, performance charts, brochures and other data which are prepared by the Contractor or any subcontractor, manufacturer, supplier or distributor, and which illustrate some portion of the work. It shall be the Contractor's responsibility to furnish Shop Drawings as required by the technical specifications or as requested by the Engineer. These submittals must be made no later than is required by the Submittal Schedule. 4.16.2 Shop Drawings shall show the principal dimensions, weight, structural and operating features, space required, clearances, type and/or brand of finish or shop coat, grease fittings, etc., depending on the subject of the drawing. When it is customary to do so, when the dimensions are of particular importance, or when so specified, the drawings shall be certified by the manufacturer or fabricator as correct for the contract. 4.16.3 When so specified or if considered by the Engineer to be acceptable, manufacturer's specifications, catalog data, descriptive matter, illustrations, etc., may be submitted for approval in place of Shop and Working Drawings. In such case the requirements shall be as specified for Shop and Working Drawings, insofar as applicable except that the submission shall be in quadruplicate. 67 4.16.4 T he Contractor shall be responsible for the prompt and timely submittal of all Shop and Working Drawings so that there shall be no delay to the work due to the absence of such drawings. 4.16.5 The Contractor shall check the Shop Drawings, shall coordinate them (by means of coordination drawings wherever required) with the work of all trades involved before submission and shall indicate thereon his approval. Drawings and schedules submitted without evidence of the Contractor's approval may be returned for resubmission. 4.16.6 By approving and submitting Shop Drawings, the Contractor thereby represents that he has determined and verified all field measurements, field construction criteria, materials, catalog numbers and similar data, or will do so, and that he has checked and coordinated each Shop Drawing with the requirements of the work and of the Contract Documents. 4.16.7 If drawings or schedules show variations from the contract requirements because of standard shop practice or for other reasons, the Contractor shall describe such variations in his letter of transmittal. If acceptable, the Engineer may approve any or all such variations and issue an appropriate Change Order. If the Contractor fails to describe such variations he shall not be relieved of the responsibility for executing the work in accordance with the contract, even though such drawings or schedules may have been approved. 4.16.8 Each Shop Drawing or Coordination Drawing shall have a blank area five (5) by five (5) inches located adjacent to the title block. The title block shall display the following: Number and Title of Drawing Date of Drawing Revision Number and Date (if applicable) Project Title Name of Project Building or Facility Name of Contractor Name of Subcontractor (if applicable) Clear identity of contents and location of the work. 4.16.9 Prior to submitting drawings to the Engineer, the Contractor shall check thoroughly all such drawings to satisfy himself that the subject matter thereof conforms to the Drawings and Specifications in all respects. All drawings which are correct shall be marked with the date, checker's name, and indication of the Contractor's approval, and then shall be submitted to the Engineer; other drawings shall be returned for correction. 4.16.10 The Contractor shall stamp all drawings which are to be submitted to the Engineer for approval. The rubber stamp shall incorporate the following items: PROJECT TITLE __________________________________________ CONTRACTOR'S NAME ___________________________________ APPROVED BY DATE _______________ SPECIFICATION SECTION TR ANSMITTAL NO.______ 4.16.11 The review of Shop Drawings will be general only and shall not relieve or, in any respect, diminish the responsibility of the Contractor for details of 68 desig n, dimensions, etc., necessary for proper fitting and construction of the work as required by the contract and for achieving the result and performance specified thereunder. 4.16.12 Should the Contractor submit for approval equipment that requires modifications to the structures, piping, layout, etc., detailed on the Drawings, he shall also submit for approval details of the proposed modifications. If such equipment and modifications are approved, the Contractor, at no additional cost to the Owner, shall do all work necessary to make such modifications. Required structural changes shall be designed and detailed by an Engineer registered in the state in which the project will be constructed. Drawings shall be signed and show registration number or may have seal affixed. 4.16.13 Submission of Shop Drawings shall be accompanied by a copy of a transmittal letter containing project name, Contractor's name, number of drawings, titles, specifications section and other pertinent data. The submittal shall include the following: 6 legible copies of Shop Drawings or printed matter 4.16.14 The review of Shop Drawings will be performed by the Engineer as follows: 4.16.14.1 When the submittal conforms fully with the Contract Drawings and Specifications, the Engineer will approve it. The reproducible of each drawing or page of approved submittals will be stamped approved, signed, dated and returned to the Contractor. No changes shall be made on approved drawings by the Contractor. If the Contractor desires to make any change from approved drawings, or pages of approved submittals, he shall notify the Engineer in writing that the approved material has been withdrawn and shall submit the substitution set in accordance with the above procedure. 4.16.14.2 When the submittal clearly does not conform with the Contract Drawings and Specifications, the Engineer will disapprove it by stamping it "Rejected." Rejected submittals shall be corrected and resubmitted within fourteen (14) calendar days from the date of rejection. Submittals which are rejected shall not be released for any work. 4.16.14.3 When the submittal has only minor deviations from the Contract Drawings and Specifications, the Engineer will note the deviations and omissions as may be appropriate and approve the submittal subject to the notations by stamping it "Approved as Noted." Approved as Noted submittals may be released for fabrication of work at the Contractor's risk; in any event the submittal shall be corrected and resubmitted for approval within fourteen (14) calendar days from the date of approval as noted. 4.16.15 The Contractor shall be responsible for delays resulting from the rejection or approval as noted of incomplete, inadequate, incorrect or otherwise unacceptable submittals. 4.16.16 The Contractor shall assure that only drawings and pages of printed material bearing the Engineer's "Approved" stamp are allowed on the job site. 4.16.17 The Contractor shall submit, at the completion of the project, one set of 69 all r eviewed and corrected Shop Drawings, catalog cuts and descriptive literature for the Owner before final Certificate of Payment is issued. 4.17 OPERATING AND MAINTENANCE MANUALS: 4.17.1 One copy of each required Operating and Maintenance Manual must be submitted to the Engineer with the first submittal of Shop Drawings. Five additional copies of each required Operating and Maintenance Manual must be submitted to the Engineer within fourteen (14) days of the return of approved Shop Drawings to the Contractor. No payment will be approved on any equipment for which Operating and Maintenance Manuals are required until the Operating and Maintenance Manuals are received by the Engineer. These Operating and Maintenance Manuals must be addressed specifically to the piece of equipment supplied and shall not be general in nature; each item must be clearly identified and located. Each page must be printed on 8-½" x 11" paper or folded to that size in a manner which will be suitable for insertion in a 3-ring binder. 4.18 SAMPLES: 4.18.1 Samples are physical examples furnished by the Contractor to illustrate materials, equipment or workmanship, and to establish standards by which the work will be judged. It shall be the Contractor's responsibility to furnish samples as required by the Technical Specifications or as requested by the Engineer. These samples must be submitted no later than is required by the Submittal Schedule. 4.18.2 Each sample shall have a label indicating: Project Title Name of Project Building or Facility Name of Contractor Name of Subcontractor (if applicable) Identification of Material with Specification Section Name or Producer and Brand (if any) 4.18.3 Samples shall be submitted in duplicate unless otherwise noted in the Technical Specifications and shall be accompanied by a copy of a transmittal letter containing project name, Contractor's name, number of samples, specification section and other pertinent data. 4.18.4 If the Engineer so requires, either prior to or after commencement of the work, the Contractor shall submit samples of materials for such special tests as the Engineer deems necessary to demonstrate that they conform to the Specifications. Such samples shall be furnished, taken, stored, packed and shopped by the Contractor as directed. Except as otherwise expressly specified, the Contractor shall make arrangements for, and pay for, the tests. 4.18.5 All samples shall be packed so as to reach their destination in good condition. To insure consideration of samples, the Contractor shall notify the Engineer by letter that the samples have been shipped and shall properly describe the samples in the letter. The letter of notification shall be sent separate from and should not be enclosed with the samples. 4.18.6 The Contractor shall submit data and samples, or place his orders, sufficiently early to provide ample time for consideration, inspection, testing and approval before the materials and equipment are needed for incorporation in the work. The consequences of his failure to do so shall be 70 the Cont ractor's sole responsibility. 4.18.7 In order to demonstrate the proficiency of workmen, or to facilitate the choice among several textures, types, finishes, surfaces, etc., the Contractor shall provide such samples of workmanship of wall, floor, finish, etc., as may be required. 4.19 STORAGE OF MATERIALS AND EQUIPMENT: 4.19.1 All excavated materials, construction equipment, and materials and equipment to be incorporated in the work shall be placed so as not to injure any part of the work or existing facilities and so that free access can be had at all times to all parts of the work and to all public utility installations in the vicinity of the work. Materials and equipment shall be kept neatly piled and compactly stored in such locations as will cause a minimum of inconvenience to public travel and adjoining Owners, tenants and occupants. 4.20 INSPECTION AND TESTING: 4.20.1 All materials and equipment used in the construction of the project shall be subject to adequate inspection and testing in accordance with generally accepted standards, as required and defined in the Contract Documents. 4.20.2 The Owner shall provide all inspection and testing services not required by the Contract Documents. 4.20.3 The Contractor shall provide at his expense the testing and inspection services required by the Contract Documents. 4.20.4 If the Contract Documents, laws, ordinances, rules, regulations or orders of any public authority having jurisdiction require any work to specifically be inspected, tested or approved by someone other than the Contractor, the Contractor will give the Engineer timely notice of readiness. The Contractor will then furnish the Engineer the required certificates of inspection, testing or approval. 4.20.5 Inspections, tests or approvals by the Engineer or others shall not relieve the Contractor from his obligations to perform the work in accordance with the requirements of the Contract Documents. 4.20.6 The Engineer and his representatives will at all times have access to the work. In addition, authorized representatives and agents of any participating Federal or State agency shall be permitted to inspect all work, materials, payrolls, records of personnel, invoices of materials and other relevant data and records. The Contractor will provide proper facilities for such access and observation of the work and also for any inspection or testing thereof. 4.20.7 If any work is covered contrary to the written instructions of the Engineer it must, if requested by the Engineer, be uncovered for his observation and replaced at the Contractor's expense. 4.20.8 If the Engineer considers it necessary or advisable that covered work be inspected or tested by others, the Contractor, at the Engineer's request, will uncover, expose or otherwise make available for observation, inspection or testing as the Engineer may require, that portion of the work in question, furnishing all necessary labor, materials, tools and equipment. If it is found that such work is defective, the Contractor will bear all the expenses of such uncovering, exposure, observation, inspection and testing and of 71 sati sfactory reconstruction. If, however, such work is not found to be defective, the Contractor will be allowed an increase in the contract price or an extension of the contract time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing and reconstruction and appropriate Change Order shall be issued. 4.21 SUBSTITUTIONS: 4.21.1 The Contractor may recommend the substitution of a material, article or piece of equipment of equal function for those referred to in the Contract Documents by reference to brand name or catalogue number, and if, in the opinion of the Engineer, such material, article or piece of equipment is of equal function to that specified, the Engineer may approve its substitution and use by the Contractor. Any cost differential shall be deductible from the contract price and the Contract Documents shall be appropriately modified by Change Order. The Contractor warrants that if substitutes are approved, no major changes in the function or general design of the project will result. Incidental changes or extra component parts required to accommodate the substitute will be made by the Contractor without a change in the contract price or contract time. 4.22 ''OR EQUAL" CLAUSE: 4.22.1 The phrase "or equal" shall be construed to mean that material or equipment will be acceptable only when in the judgement of the Engineer they are composed of parts of equal quality, or equal workmanship and finish, designed and constructed to perform or accomplish the desired result as efficiently as the indicated brand, pattern, grade, class, make or model. 4.22.2 Whenever a material, article or piece of equipment is identified on the Drawings or in the Specifications by reference to manufacturers' or vendors' names, trade names, catalogue numbers, etc., it is intended merely to establish a standard of quality and function; and, any material, article, or equipment of other manufacturers and vendors which will perform adequately the duties imposed by the general design will be considered equally acceptable provided the material, article or equipment so proposed, is, in the opinion of the Engineer, of equal substance and function. It shall not be purchased or installed by the Contractor without the Engineer's written approval. 4.23 WAGES AND OVERTIME COMPENSATION: 4.23.1 The Contractor and each of his subcontractors shall comply with all applicable State and local laws or ordinances with respect to the hours worked by laborers and mechanics engaged in work on the project and with respect to compensation for overtime. 4.24 NO WAIVER: 4.24.1 Neither the inspection by the Owner or the Engineer, nor any order, measurement, approval, determination, decision or certificate by the Engineer, nor any order by the Owner for the payment of money, nor any payment for or use, occupancy, possession or acceptance of the whole or any part of the work by the Owner, nor the extension of time, nor any other act or omission of the Owner or of the Engineer shall constitute or be deemed to be an acceptance of any defective or improper work, materials, or equipment nor operate as a waiver of any requirement or provision of the contract, nor of any remedy, power or right of or herein reserved to the Owner, nor of any right to damages for breach of contract. Any and all 72 right s and/or remedies provided for in the contract are intended and shall be construed to be cumulative; and, in addition to each and every other right and remedy provided for herein by law, the Owner shall be entitled as of right to a writ of injunction against any breach or threatened breach of the contract by the Contractor, by his subcontractors or by any other person or persons. 4.25 WORK TO CONFORM: 4.25.1 During its progress and on its completion, the work shall conform truly to the lines, levels, and grades indicated on the Drawings or given by the Engineer and shall be built in a thoroughly substantial and workmanlike manner, in strict accordance with the Drawings, Specifications, and other Contract Documents and the directions given from time to time by the Engineer. 4.25.2 All work done without instructions having been given therefor by the Engineer, without proper lines or levels, or performed during the absence of the Engineer, will not be estimated or paid for except when such work is authorized by the Engineer in writing. Work so done may be ordered uncovered or taken down, removed and replaced at the Contractor's expense. 4.26 WORKING HOURS: 4.26.1 It is contemplated that all work will be performed during the customary working hours of the trades involved unless otherwise specified in this contract. Work performed by the Contractor at his own volition outside such customary working hours shall be at no additional expense to the Owner. 4.26.2 Any requests received by the Contractor from occupants of existing buildings to change the hours of work shall be referred to the Owner for determination. 5. INSURANCE, LEGAL RESPONSIBILITY AND SAFETY: 5.1 MEDIATION: 5.1.1 The Parties agree that all claims, disputes, and other matters (“Claims”) in question between the Parties arising out of or relating to this Agreement or breach thereof shall first attempt to be resolved between themselves including escalating up to the appropriate levels of each Party. If after thirty (30) business days following making of the Claim the Claim remains unresolved, then the Parties agree to submit the Claim for confidential, non- binding mediation with both Parties agreeing to the mediator no later than forty -five (45) business days after written agreement to engage in mediation. The Mediator must be located within 25 miles of the Mauldin City Hall. The fees and expenses of the mediator shall be equally shared by both Parties. Each Party is responsible for its own costs, expenses, consultant fees and attorney fees incurred in the presentation or defense of the Claims that is subject to mediation between the Parties. The Parties agree to fully cooperate and participate in good faith to resolve the Claims. No written or verbal representation made by either Party in the course of any discussions attempting to resolve the Claims or other settlement negotiations shall be deemed to be a party admission. 5.1.2 If mediation fails to resolve the Claims , arbitration shall be promptly conducted in accordance with the Construction Industry Arbitration Rules of 73 the Amer ican Arbitration Association or through such other neutral as the parties may agree. The Contractor will be responsible for all costs associated with the Arbitration. 5.1.3 The failure of either Party to enforce or act upon any right afforded it by this Agreement shall not be deemed a waiver of such right for future acts of a similar nature. 5.1.4 THE PARTIES AGREE TO WAIVE ANY RIGHT TO A TRIAL BY JURY AS TO ANY CLAIM, COUNTERCLAIM, OR CAUSE OF ACTION OF ANY KIND OR NATURE EITHER MAY HAVE HAD ARISING OUT OF OR RELATING TO THIS AGREEMENT OR ANY TASK ORDER PERFORMED HEREUNDER. 5.2 ASSIGNMENTS: 5.2.1 The Contractor shall not assign the whole or any part of the contract or any monies due or to become due hereunder without written consent of the Owner. In case the Contractor assigns all or any part of any monies due or to become due under this contract, the instrument of assignment shall contain a clause substantially to the effect that is agreed that the right of the assignee in and to any monies due or to become due to the Contractor shall be subject to prior claims of all persons, firms and corporations for services rendered or materials supplied for the performance of the work called for in this contract. 5.3 PERFORMANCE BOND AND PAYMENT BOND: 5.3.1 Unless otherwise noted in the Special Provisions, a Performance Bond and a Payment Bond are required. The Contractor shall obtain a Performance Bond and a Payment Bond, acceptable to the Owner in a surety company authorized to do business in the state in which the project is constructed, each for the full amount of the contract Sum. The bonds shall guarantee the Contractor's faithful performance of the contract and the payment of all obligations arising thereunder. The bonds shall remain in force until: 5.3.1.1 The project has been completed and accepted by the Owner. 5.3.1.2 The provisions of all guarantees required by these Contract Documents have been fulfilled or the time limitation for all guarantees has expired, or 5.3.1.3 The time for the filing of all mechanic's liens has expired, whichever is longer, after which it shall become void. 5.3.2 The Contractor shall pay all charges in connection with the bonds as a part of the contract. One executed copy of the bonds shall be attached to each copy of the contract before they are returned to the Engineer for the Owner's signature. 5.3.3 If the Contractor defaults, the Contractor or his Surety shall reimburse the Owner for any additional engineering fees for additional services made necessary because of the Contractor's default. 5.4 ADDITI ONAL OR SUBSTITUTE BOND: 5.4.1 If at any time the Owner for justifiable cause, shall be or become dissatisfied 74 wit h the surety or sureties for the Performance and/or Payment Bonds, the Contractor shall within five (5) days after notice from the Owner to do so, substitute an acceptable bond(s) in such form and sum and signed by such other surety or sureties as may be satisfactory to the Owner. The premiums on such bond(s) shall be paid by the Contractor. No further payments shall be deemed due nor shall be made until the new surety or sureties shall have furnished an acceptable bond(s) to the Owner. 5.5 CHANGES NOT TO AFFECT BONDS: 5.5.1 It is distinctly agreed and understood that any changes made in the work or the Drawings or Specifications therefor (whether such changes increase or decrease the amount thereof or the time required for it performance) or any changes in the manner or time of payments made by the Owner to the Contractor, or any other modifications of the contract, shall in no way annul, release, diminish or affect the liability of the Surety on the contract bonds given by the Contractor, it being the intent hereof that notwithstanding such changes the liability of the Surety on said bonds continue and remain in full force and effect. 5.6 COMPLIANCE WITH LAWS: 5.6.1 The contract shall be governed by the law of the place where the project is located. The Contractor shall abide by all local and State laws or ordinances to the extent that such requirements do not conflict with Federal laws or regulations. The Contractor shall keep himself fully informed of all existing and future Federal, State and local laws, ordinances, rules and regulations affecting those engaged or employed on the work, the materials and equipment used in the work or the conduct of the work, and of all orders, decrees and other requirements of bodies or tribunals having any jurisdiction or authority over the same, including, but not limited to the U. S. Department of Labor and Bureau of Standards Safety and Health Regulations for Construction and its amendments as set up under the Williams-Steiger Occupational Safety and Health Act of 1970. If any discrepancy or inconsistency is discovered in the Drawings, Specifications or other Contract Documents in relation to any such law, ordinance, rule, regulation, order, decree or other requirement. The Contractor shall forthwith report the same to the engineer in writing. The Contractor shall at all times observe and comply with, and cause all his agents, servants, employees and subcontractors to observe and comply with all such existing requirements, and he shall protect, indemnify and save harmless the Owner, its officers, agents, servants and employees, from and against any and all claims, demands, suits, proceedings, liabilities, judgements, penalties, losses, damages, costs and expense, including attorney's fees, arising from or based upon any violation or claimed violation of any such law, ordinance, rule, regulation, order, decree or other requirement, whether committed by the Contractor or any of his agents, servants, employees or subcontractors. 5.7 REQUIRED PROVISIONS DEEMED INSERTED: 5.7.1 Each and every provision of law and clause required by law to be inserted in this contract shall be deemed to be inserted herein, and the contract shall be read and enforced as though it were included herein. If through mistake or otherwise any such provision is not inserted, or is not correctly inserted, then upon the application of either party the contract shall forthwith be physically amended to make such insertion or correction. 5.8 LIENS: 75 5.8.1 I f at any time any notice of liens are filed for labor performed or materials or equipment manufactured, furnished or delivered to or for the work, the Contractor shall, at his own cost and expense, promptly discharge, remove or otherwise dispose of the same, and until such discharge, removal or disposition, the Owner shall have the right to retain from any monies payable hereunder an amount which, in his sole judgement, he deems necessary to satisfy such liens and pay the costs and expenses, including attorney's fees, of defending any actions brought to enforce the same, or incurred in connection wherewith or by reason thereof. 5.9 CLAIMS: 5.9.1 If at any time there be any evidence of any claims for which the Contractor is or may be liable or responsible hereunder, the Contractor shall promptly settle or otherwise dispose of the same, and until such claims are settled or disposed of, the Owner may retain from any monies which would otherwise be payable hereunder so much thereof as, in his judgement, he may deem necessary to settle or otherwise dispose of such claims and to pay the costs and expenses, including attorney's fees, of defending any actions brought to enforce such claims, or incurred in connection therewith or by reason thereof. 5.10 INSURANCE: 5.10.1 The Contractor shall not commence any work until he obtains, at his own expense, all required insurance. Such insurance must have the approval of the Owner as to limit, form and amount. The Contractor will not permit any subcontractor to commence work on this project until the same insurance requirements have been complied with by such subcontractor. 5.10.2 The Contractor shall furnish the Owner with certificates showing the type, amount, class of operations covered, effective dates and dates of expiration of policies. Such certificates shall also contain substantially the following statement: "The insurance covered by this certificate will not be cancelled or materially altered, except after thirty (30) days notice in writing and delivered by registered mail to the Owner." Should any policy be cancelled before final payment by the Owner to the Contractor and the Contractor fails immediately to procure other insurance as specified, the Owner reserves the right to procure such insurance and to deduct the cost thereof from any sum due the Contractor under this contract. 5.10.3 Any insurance bearing on adequacy of performance shall be maintained after completion of the project for the full guaranty period. Should such insurance be cancelled before the end of the guaranty period and the Contractor fails immediately to procure other insurance as specified, the Owner reserves the right to procure such insurance and to charge the cost thereof to the Contractor. 5.10.4 Nothing contained in these insurance requirements is to be construed as limiting the extent of the Contractor's responsibility for payment of damages resulting from his operations under this contract. 5.10.5 The Contractor is required to obtain and maintain for the full period of the contract the following types of insurance coverage with limits not less than stated below: 5.10.5.1 WO RKMEN'S COMPENSATION INSURANCE: As required by applicable State or territorial law for all of his employees to be engaged in work at the site of the project under this contract and, 76 in cas e of any such work sublet, the Contractor shall require the subcontractor similarly to provide Workmen's Compensation Insurance for all of the latter's employees to be engaged in such work unless such employees are covered by the protection afforded by the Contractor's Workmen's Compensation Insurance. In case any class of employee engaged in hazardous work on the project under this contract is not protected under the Workmen's Compensation Statute, the Contractor shall provide and shall cause each subcontractor to provide adequate employer's liability insurance for the protection of such of his employees as are not otherwise protected. 5.10.5.2 CO MPREHENSIVE GENERAL LIABILITY Bodily Injury B odily Injury Property Per Person Per Accident Damage Premises and Operations 500,000 1,000,000 1,000,000 Elevator Liability 500,000 1,000,000 1,000,000 Contractor's Pro- tective Liability 500,000 1,000,000 1,000,000 Products Liability Including Completed Operations Coverage 500,000 1,000,000 1,000,000 The above Comprehensive General Liability Policy shall include coverage for the explosion, collapse and underground (XCU) hazards, and loss arising from nuisance, taking, whether inverse taking or direct taking, or negligence. The Property Damage Liability shall include the “Broad Form Property Damage” endorsement. 5.10.5.3 CO MPREHENSIVE AUTOMOBILE LIABILITY All Owned Automobiles 500,000 1,000,000 1,000,000 Non Owned Automobiles 500,000 1,000,000 1,000,000 Hired Car Coverage 500,000 1,000,000 1,000,000 5.10.5.4 UMBR ELLA LIABILITY The Contractor shall maintain a Comprehensive Umbrella Liability Policy in excess of above insurance of $2,000,000 each occurrence. 5.10.5.4 SUBCO NTRACTOR'S LIABILITY INSURANCE: Same limits as required of the General Contractor. 5.11 ORAL AGREEMENTS: 5.11.1 No oral order, objection, claim or notice by any party to the others shall 77 affec t or modify any of the terms or obligations contained in any of the Contract Documents, and none of the provisions of the Contract Documents shall be held to be waived or modified by reason of any act whatsoever, other than by a definitely agreed waiver or modification thereof in writing, and no evidence shall be introduced in any proceeding of any other waiver or modification. 5.12 SAFETY: 5.12.1 In accordance with generally accepted construction practices, the Contractor shall be solely and completely responsible for conditions of the job site, including safety of all persons and property affected directly or indirectly by his operations during the performance of the work. This requirement will apply continuously twenty-four (24) hours per day until acceptance of the work by the Owner and shall not be limited to normal working hours. 5.12.2 The Contractor shall take all reasonable precautions for the safety of, and shall provide all reasonable protection to prevent damage, injury or loss to: 5.12.2.1 All employees on the work and all other persons who may be affected thereby; 5.12.2.2 All the work and all materials and equipment to be incorporated therein, whether in storage on or off the site, under the care, custody or control of the Contractor or any of his subcontractors or sub-subcontractors; and 5.12.2.3 Other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. 5.12.3 The Contractor shall comply with all applicable laws, ordinances, rules, regulations and lawful orders of any public authority having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss. He shall erect and maintain, as required by existing conditions and progress of the work, all reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying Owners and users of adjacent utilities. 5.12.4 When the use or storage of explosives or other hazardous materials or equipment is necessary for the execution of the work, the Contractor shall exercise the utmost care and shall carry on such activities under the supervision of properly qualified personnel. Prior approval of such materials or services must be given by the Engineer. 5.12.5 The Contractor shall designate a responsible member of his organization at the site whose duty shall be the prevention of accidents. This person shall be the Contractor's superintendent unless otherwise designated in writing by the Contractor to the Owner and the Engineer. 5.12.6 The Contractor shall not load or permit any part of the work to be loaded so as to endanger its safety. 6. PROGRESS AND COMPLETION OF WORK 6.1 NOTICE TO PROCEED: 78 6.1.1 F ollowing the execution of the Agreement by the Owner and the Contractor, written Notice to Proceed with the work shall be given by the Owner to the Contractor. The Contractor shall begin and shall prosecute the work regularly and uninterruptedly thereafter (except as provided for herein) with such force as to secure the completion of the work within the contract time. 6.2 CONTRACT TIME: 6.2.1 The Contractor shall complete, in an acceptable manner, all of the work contracted for in the time stated in Section 01232, Special Provisions. Computation of contract time shall commence the day to be specified in the Notice to Proceed and every calendar days following, except as herein provided, shall be counted as contract time. 6.3 SCHEDULE OF COMPLETION: 6.3.1 The Contractor shall submit, at such times as may be reasonable and requested by the Engineer, schedules showing the order in which the Contractor proposes to carry on the work, with dates at which the Contractor will start the various parts of the work, and estimated date of completion of each part. 6.4 WORK CHANGES: 6.4.1 The work comprises approximately the quantities shown in the Bid Schedule which will be used as a basis for comparison of Bids and not for final estimate. The Owner does not, by expression or by implication, agree that the actual amount of work shall correspond with the estimated quantities. 6.4.2 The Owner reserves the right to increase the amount of work under the each Bid Item in the Contract by twenty-five percent (25%) of the work contemplated at the unit prices quoted in the Bid. The Owner reserves the right to decrease the amount of work under each Bid Item in the Contract by any amount without any change to the unit prices bid. 6.5 EXTRA WORK: 6.5.1 New and unforeseen items of work found to be necessary, and which cannot be covered by any item or combination of items for which there is a contract price, shall be classed as extra work. The Contractor shall do such extra work and furnish such materials as may be required for the proper completion or construction of the whole work contemplated, upon written order from the Owner as approved by the Engineer. In the absence of such written order, no claim for extra work shall be considered. Extra work shall be performed in accordance with these Contract Documents where applicable and work not covered by such shall be done in accordance with the best construction practice and in a workmanlike manner. Extra work required in an emergency to protect life and property shall be performed by the Contractor as required. 6.6 EXTENSION OF CONTRACT TIME: 6.6.1 A delay beyond the Contractor's control occasioned by an Act of God, by act or omission on the part of the Owner or by strikes, lockouts, fire, etc., may entitle the Contractor to an extension of time in which to complete the work as agreed by the Owner, provided, however, that the Contractor shall immediately give written notice to the Owner of the cause of such delay. 79 6.6.2 A ct of God shall mean an earthquake, flood, cyclone or other cataclysmic phenomenon of nature. Rain, wind, flood or other natural phenomenon of normal intensity for the locality shall not be construed as an Act of God and no reparation shall be made to the Contractor for damages to the work resulting therefrom. 6.6.3 All claims for extension of time shall be made in writing to the Engineer no more than twenty (20) days after the occurrence of the delay; otherwise they shall be waived. In the case of continuing cause of delay only one claim is necessary. Any claim should include complete justification for the extent of the delay claimed. 6.6.4 This Subsection does not exclude the recovery of damages for delay for either party under other provisions of the Contract Documents. 6.7 ENGINEER'S CERTIFICATE OF SUBSTANTIAL COMPLETION: 6.7.1 When the work to be performed under this contract is substantially completed In accordance with the Contract Documents, the Engineer shall prepare an Engineer's Certificate of Substantial Completion to be acknowledged and accepted by the Owner and the Contractor. The Certificate may list items to be completed or corrected but such Certificate shall not relieve the Contractor of his obligation to complete all work, whether listed or not, in accordance with the Contract Documents nor will it preclude any right the Owner may have for recourse in accordance with the Contract Documents. 6.8 TERMINATIO N OF CONTRACTOR'S RESPONSIBILITY: 6.8.1 The contract will be considered complete when all work has been finished, the final review made up by the Engineer, and the project accepted in writing by the Owner. The Contractor's responsibility shall then cease, except as set forth in his Performance Bond, as provided in Subsection 4.6 Entitled GENERAL GUARANTY, and as provided in Subsection 6.9 entitled CORRECTION OF FAULTY WORK AFTER FINAL PAYMENT. 6.9 CORRECTION OF FAULTY WORK AFTER FINAL PAYMENT: 6.9.1 The making of the final payment by the Owner to the Contractor shall not relieve the Contractor of responsibility for faulty materials or workmanship. The Contractor shall promptly replace any such defects discovered within one year, except where longer periods are specified, from the date of written acceptance of the work. 6.10 PROGRESS SCHEDULE: 6.10.1 Within twenty (20) days after execution and delivery of the Agreement and not less than ten (10) days prior to making an application for partial payment, the Contractor shall prepare and deliver to the Engineer a Progress Schedule. 6.10.2 The schedule shall be set up in a bar chart format and shall show the proposed dates of commencement and completion of the various subdivisions of the work required under the Contract Documents and all activities required to accomplish the work. 6.10.3 The schedule shall be updated monthly. No progress payments will be made unless application is accompanied by the updated schedule. 80 6.11 SCHEDULES, REPORTS AND RECORDS: 6.11.1 The Contractor shall submit to the Owner such schedules of quantities and costs, progress schedules, payrolls, reports, estimates, records and other data where applicable as are required by the Contract Documents for the work to be performed. 6.11.2 The Contractor shall also submit, in a format as approved by the Engineer, a schedule of payments that he anticipates he will earn during the course of the work. 6.12 ABANDONME NT OF WORK OR OTHER DEFAULT: 6.12.1 If the work shall be abandoned, or any part thereof shall be sublet without previous written consent of the Owner, or the Contractor or any monies payable hereunder shall be assigned otherwise than as herein specified, or if at any time the Engineer shall be of the opinion, and shall so certify in writing, that the conditions herein specified as to rate or progress are not being complied with, or that the work or any part thereof is being unnecessarily or unreasonably delayed, or that the Contractor has violated or is in default under any of the provisions of the contract, or if the Contractor becomes bankrupt or insolvent or goes or is put into liquidation or dissolution, either voluntarily or involuntarily, or petitions for an arrangement or reorganization under the Bankruptcy Act, or makes a general assignment for the benefit of creditors or otherwise acknowledges insolvency, the happening of any of which shall be and constitute a default under the contract, the Owner may notify the Contractor in writing, with a copy of such notice mailed to the Surety, to discontinue such work or any part thereof; thereupon the Contractor shall discontinue such work or such part thereof as the Owner may designate; and the Owner may, upon giving notice, by contract or otherwise as he may determine, complete the work or such part thereof and charge the entire cost and expense of so completing the work or such part thereof to the Contractor. In addition to the said entire cost and expense of completing the work, the Owner shall be entitled to reimbursement from the Contractor and the Contractor agrees to pay the Owner any losses, damages, costs and expenses, including attorney's fees, sustained or incurred by the Owner by reasons of any of the foregoing causes. For the purposes of such completion the Owner may for itself or for any Contractors employed by the Owner take possession of any and use or cause to be used any and all materials, equipment, plant, machinery, appliances, tools, supplies and such other items of every description that may be found or located at the site of the work. No equipment or materials may be removed from the work without the written consent of the Owner. 6.12.2 All costs, expenses, losses, damages, attorney's fees and any and all other charges incurred by the Owner under this Subsection shall be charged against the Contractor and deducted and/or paid by the Owner out of any monies due or payable or to become due or payable under the contract to the Contractor; in computing the amounts chargeable to the Contractor, the Owner shall not be held to a basis of the lowest prices for which the completion of the work or any part thereof might have been accomplished, but all sums actually paid or obligated therefor to effect its prompt completion shall be charged to and against the account of the Contractor. In case the costs, expense, losses, damages, attorney's fees and other charges together with all payments theretofore made or for the account of the Contractor are less than the sum which would have been payable under the contract if the work had been properly performed and completed by the Contractor, the Contractor shall be entitled to receive the difference and, in case such costs, expenses, losses, damages, attorney's fees and other 81 charges together with all payments theretofore made to or for the account of the Contractor, shall exceed the said sum, the Contractor shall pay the amount of the excess to the Owner. 7. PAYMENTS TO THE CONTRACTOR 7.1 PRICES FOR WORK: 7.1.1 The Owner shall pay and the Contractor shall receive the prices stipulated in the bid made a part hereof as full compensation for everything performed and furnished and for all risks and obligations undertaken by the Contractor under and as required by the contract. 7.2 SCHEDULE OF VALUES: 7.2.1 Except in cases where unit prices form the basis for payment under the contract, the Contractor shall, within twenty (20) days of the execution of the contract and not less than ten (10) days prior to making an application for partial payment, submit to the Owner in a form approved by the Owner a schedule of values showing a breakdown of the contract sum itemized by trade and/or specification sections or as otherwise directed by the Owner and for each item shall show the total value including the Contractor's overhead and profit. Upon approval by the Owner, this schedule will be used in determining the value of the work done for the purpose of partial payments. 7.2.2 The costs employed in making up any of these schedules will be used only for determining the basis of partial payments and will not be considered as fixing a basis for additions to or deductions from the contract price. 7.3 APPLICATION FOR PARTIAL PAYMENT: 7.3.1 Before the first day of each month, or as otherwise directed by the Owner, the Contractor shall make applications for the value of the work done. Payment for materials stored on-site for use in this Contract will be paid minus the specified retainage unless specified otherwise. The materials must be properly stored and documented, and actual invoices must be submitted with the Application for Payment. Such applications shall show the breakdown of the project into the same items as the schedule of values specified in Subsection 7.2, entitled SCHEDULE OF VALUES and showing for each item the total value, the value previously reported as complete, the value completed during the month, the cumulative value completed and the value remaining to be done. The application shall include the total value completed to date minus the amount of the retainage indicated in Subsection 7.4 entitled RETAINAGE minus previous payments made to the Contractor. 7.3.2 The Engineer will, within ten (10) days after receipt of each partial payment estimate, either indicate in writing his approval of payment and present the partial payment estimate to the Owner, or return the partial payment estimate to the Contractor indicating in writing his reasons for refusing to approve payment. In the latter case, the Contractor may make the necessary corrections and resubmit the partial payment estimate. 7.4 RETAINAGE: 7.4.1 The Owner shall retain ten percent (10%) of the amount of each payment until final completion and acceptance of all work covered by the contract Documents. 82 7.5 PAYMENTS WITHHELD: 7.5.1 The Owner may withhold payment or, on account of subsequently discovered evidence, nullify the whole or part of any application to the extent necessary to protect himself from loss on account of: 7.5.1.1 Defective work not remedied. 7.5.1.2 Claims filed or reasonable evidence indicating the probably filing of claims. 7.5.1.3 Failure of the Contractor to make payments to subcontractors, material suppliers, or employees. 7.5.1.4 A reasonable doubt that the contract work can be completed for the balance unpaid. 7.5.1.5 Damage to another Contractor. 7.5.2 When the above founds are removed, payment will be made for the amounts withheld because of them. 7.6 PAYMENT OF APPLICATIONS FOR PARTIAL PAYMENT: 7.6.1 Upon verification and approval of the application for partial payment made as specified, the Owner will make payment of the amount found properly due. No payment made to the Contractor nor partial or entire use or occupancy of the work by the Owner shall be an acceptance of any work or materials not in accordance with this contract. 7.7 FINAL INSPECTION: 7.7.1 Upon receipt of written notice from the Contractor that the work has been completed and finished in accordance with the contract, the Owner shall cause an inspection to be made of the work by his authorized representatives. If the Owner and/or Engineer believe the work is not completed, the Contractor will be so advised, and the inspection will not be performed until the outstanding issues are completed or corrected by the Contractor. A list shall be made of all deviations from the contract requirements (commonly termed "punch list") and a copy of such list furnished to the Contractor. The Contractor shall with reasonable haste remedy all defects so noted and shall notify the Owner upon the completion of such work. When inspection by the Owner's authorized representatives shows the work to be complete in accordance with the contract, application for final payment may be made. All defects/deficiencies must be corrected by the Contractor and acceptance of the work must be made by the Owner's authorized representatives on or before the final completion date specified in the Agreement. Liquidated damages will be assessed for each calendar day after the specified final completion date required to complete all punchlist items and obtain acceptance by the Owner’s representatives. 7.8 RELEASE OF LIENS: 7.8.1 Neither the final payment nor any part of the retained percentage shall become due until the Contractor shall deliver to the Owner a complete and notarized release of all liens arising out of this contract, or receipts in full in lieu thereof, and if required in either case, an affidavit that so far as he had knowledge the information, the releases and receipts include all the labor 83 and mater ial for which a lien could be filed; but the Contractor may, if any subcontractor refuses to furnish a release or receipt in full, furnish a bond satisfactory to the Owner, to indemnify him against any lien. If any lien remains unsatisfied after all payments are made, the Contractor shall refund to the Owner all monies that the latter may be compelled to pay in discharging such a lien, including all costs and a reasonable attorney's fee. 7.9 USE OR PARTIAL PAYMENT NOT ACCEPTANCE: 7.9.1 It is agreed that this is an entire contract for one whole and complete work or result that neither the Owner's entrance upon or use of the work or any part thereof nor any partial payments by the Owner shall constitute an acceptance of the work or any part thereof before its entire completion and final acceptance. 7.10 PAYMENT FOR UNCORRECTED WORK: 7.10.1 Should the Owner direct the Contractor not to correct work that has been damaged or that was not performed in accordance with the Contract Documents, an equitable deduction from the contract amount shall be made to compensate the Owner for the uncorrected work. 7.11 PAYMENT FOR REMOVAL OR REJECTED WORK AND MATERIALS: 7.11.1 The removal of work and materials rejected in accordance with Subsection 4.3 entitled CORRECTION OF WORK BEFORE COMPLETION and the re- execution of acceptable work by the Contractor shall be at the expense of the Contractor, and he shall pay the cost of replacing the work of other Contractors destroyed or damaged by the removal of the rejected work or materials and the subsequent replacement of acceptable work. 7.11.2 Removal of rejected work or materials and storage of materials by the Owner, in accordance with Subsection 4.3 entitled CORRECTION OF WORK BEFORE COMPLETION, shall be paid by the Contractor within thirty (30) days after written notice to pay is given by the Owner. If the Contractor does not pay the expenses of such removal and after ten (10) days written notice being given by the Owner of his intent to sell the materials, the Owner may sell the materials at auction or at private sale and will pay the Contractor the net proceeds therefrom after deducting all the costs and expenses that should have been borne by the Contractor. 7.12 PAYMENT FOR EXTRA WORK: 7.12.1 Written notice of claims for payment for extra work shall be given by the Contractor within ten (10) days after receipt of instructions from the Owner to proceed with the extra work and also before any work is commenced, except in emergency endangering life or property. No claim shall be valid unless so made. In all cases, the Contractor's itemized estimate sheets showing all labor and material shall be submitted to the Owner. The Owner's order for extra work shall specify any extension of the contract time and one of the following methods of payment: 7.12.1.1 Unit price or combinations of unit prices which formed the basis of the original contract. 7.12.1.2 A lump sum based on the Contractor's estimate and accepted by the Owner. 84 7.12.1. 3 Net cost plus a fixed fee. Net costs are defined as follows: 7.12.1.3.1 Labor costs, including time of foreman while engaged directly upon extra work at rates not greater than the scale rates for each respective classification of labor customary in the area where the work is performed for each respective job classification. 7.12.1.3.2 Labor insurance taxes including amounts paid on a percent of such labor rate or on a cents per hour basis for Workmen's Compensation, Public Liability, Contractor's Contingent Liability and Contractual Liability Insurance and all Federal Old Age and Unemployment Taxes and any other taxes applicable as well as fringe benefits as may be approved by the Engineer. 7.12.1.3.3 Materials and supplies actually used on the work. 7.12.1.3.4 Rental charges for necessary equipment, as agreed upon by the Owner and Contractor. Rental charges shall not exceed those published in Rental Rates for Construction Equipment issued by the American Equipment Distributor, Equipment and tools having a value of $100.00 or less are considered to be "small tools" and, as such, are considered to be part of overhead. 7.12.2 To the cost under 7.12.1.3 there shall be added a fixed fee to be agreed upon but not to exceed fifteen percent (15%) of the estimated cost of the work. The fee shall be compensation to cover the cost of supervision, overhead, bond, profit and any other general expenses. On work performed by subcontractors, the fixed fee shall not exceed five percent (5%) of the cost of the work 7.13 PAYMENT FOR WORK SUSPENDED BY THE OWNER: 7.13.1 If the work or any part thereof shall be suspended by the Owner and abandoned by the Contractor as provided in Subsection 2.12 entitled SUSPENSION OF WORK, TERMINATION AND DELAY, the Contractor will then be entitled to payment for all work done on the portions so abandoned, plus fifteen percent (15%) of the value of the abandoned work to compensate for overhead, plant expense, and anticipated profit. 7.14 PAYMENT FOR WORK BY THE OWNER: 7.14.1 The cost of work performed by the Owner, in accordance with Subsection 2.10 entitled OWNER'S RIGHT TO DO WORK, shall be paid by the Contractor. 7.15 PAYMENT FOR WORK BY THE OWNER FOLLOWING TERMINATION OF CONTRACT BY OWNER: 7.15.1 Upon termination of the contract by the Owner in accordance with Subsection 2.11 entitled OWNER'S RIGHT TO TERMINATE CONTRACT, no further payment shall be due the Contractor until the work is completed. If the unpaid balance of the contract amount shall exceed the cost of completing the work including all overhead costs, the excess shall be paid to the Contractor. If the cost of completing the work shall exceed the unpaid balance, the Contractor shall pay the difference to the Owner. The costs incurred by the Owner, as herein provided, and the damage incurred 85 throug h the Contractor's default, shall be certified by the Owner. 7.16 PAYMENT FOR SAMPLES AND TESTING OF MATERIALS: 7.16.1 Samples furnished in accordance with Subsection 4.18 entitled SAMPLES, shall be furnished by the Contractor at his expense. 7.16.2 Testing of samples and materials furnished in accordance with Subsection 4.18 entitled SAMPLES, shall be arranged and paid for by the Owner. 7.17 ACCEPT ANCE AND FINAL PAYMENT: 7.17.1 When the Contractor shall have completed the work in accordance with the terms of the Contract Documents, he shall certify completion of the work to the Owner and submit a final Request for Payment, which shall be the contract amount plus all approved additions, less all approved deductions and less previous payments made. The Contractor shall furnish evidence that he has fully paid all debts for labor, materials and equipment incurred in connection with the work, and, upon acceptance by the Owner, the Owner will release the Contractor except as to the conditions of the Performance Bond and the Payment Bond, any legal rights of the Owner, required guaranties, and Correction of Faculty Work after Final Payment, and will pay the Contractor's final Request for Payment. The Contractor shall allow sufficient time between the time of completion of the work and approval of the final Request for Payment for the Engineer to assemble and check the necessary data. 7.17.2 The Contractor shall deliver to the Owner a complete release of all liens arising out of the contract before the retained percentage or before the final Request for Payment is paid. 7.18 ACCEPT ANCE OF FINAL PAYMENT AS RELEASE: 7.18.1 The acceptance by the Contractor of final payment shall be and shall operate as a release to the Owner of all claims and all liability to the Contractor other than claims in stated amounts as may be specifically excepted by the Contractor for all things done or furnished in connection with this work and for every act and neglect of the Owner and other relating to or arising out of this work. Any payment, however, final or otherwise, shall not release the Contractor or his sureties from any obligations under the Contract Documents or the Performance Bond and the Payment Bond. 7.19 DELAYS AND DAMAGES: 7.19.1 The date of beginning and the time for completion of the work are essential conditions of the Contract Documents and the work embraced shall be commenced on a date specified in the Notice to Proceed. 7.19.2 The Contractor will proceed with the work at such rate of progress to insure full completion within the contract time. It is expressly understood and agreed by and between the Contractor and the Owner that the contract time for the completion of the work described herein is a reasonable time, taking into consideration the average climatic and economic conditions and other factors prevailing in the locality of the work. If the Contractor refuses or fails to prosecute the work, or any separable part thereof, with such diligence as will insure its completion within the time specified in the contract, or any extension thereof, or fails to complete said work within such time, the Owner, may, by written notice to the Contractor and his Surety, terminate his right to proceed with the work or such part of the work as to which there 86 has been a delay. In such event the Owner may take over the work and prosecute the same to completion, by contract or otherwise, and may take possession of and utilize in completing the work such materials, appliances and plant as may be on the site of the work and necessary therefor. Whether or not the Contractor's right to proceed with the work is terminated, he and his sureties shall be liable for any damage to the Owner resulting from his refusal or failure to complete the work within the specified time. 7.19.3 If fixed and agreed liquidated damages are provided in the contract and if the Owner so terminates the Contractor's right to proceed, the resulting damage will consist of such liquidated damages until such reasonable time as may be required for final completion of the work together with any increased costs occasioned the Owner in completing the work. 7.19.4 If fixed and agreed liquidated damages are provided in the contract, and if the Owner does not so terminate the Contractor's right to proceed, the resulting damage will consist of such liquidated damages until the work is completed or accepted. 7.19.5 The Contractor's right to proceed shall not be so terminated nor the Contractor charged with resulting damage if: 7.19.5.1 The delay in the completion of the work arises from unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to, Acts of God, acts of the public enemy, acts of the Government in either its sovereign or contractual capacity, acts of another Contractor in the performance of a contract with the Owner, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, unusually severe weather or delays of subcontractors or supplies arising from unforeseeable causes beyond the control and without the fault or negligence of both the Contractor and such subcontractors or suppliers; and 7.19.5.2 The Contractor, within ten (10) days from the beginning of any such delay (unless the Owner grants a further period of time before the date of final payment under the contract), notifies the Owner in writing of the causes of delay. 7.19.6 As used in subparagraph 7.19.5.1, above, the term "subcontractors and suppliers" means subcontractors or suppliers at any tier. 7.19.7 The Engineer shall ascertain the facts and the extent of the delay and extend the time for completing the work when, in his judgement, the findings of fact justify such an extension, and his findings of fact shall be final and conclusive on the parties, subject only to appeal as provided in these General Conditions. 7.19.8 The rights and remedies of the Owner provided in this clause are in addition to any other rights and remedies provided by law or under this contract. (End of Section 00700) 87 NOTICE TO PROCEED To: CaJenn Construction and Rehabilitation Services, Inc. P.O. Box 38 Hoboken, GA 31542 Attn: Christy Jennings Date: ______________________ Project: 2022-2023 SEWER REHABILITATION PROJECT You are hereby notified to commence Work in accordance with the Agreement dated _______________, 20___ on or before_______________,20___, and you are to complete the Work by ____________________________ (365 calendar days). City of Mauldin (Owner) By:____________________________ Title:__________________________ ACCEPTANCE OF NOTICE Receipt of the above Notice to Proceed is hereby acknowledged by CaJenn Construction and Rehabilitation Services, Inc., this _______ day of ____________________, 2022. By:_____________________________________ Title:____________________________________ 88 CHANGE ORDER AGREEMENT OWNER: CITY OF MAULDIN Change Order No.____________________ Date:______________________________ PROJECT: 2022-2023 SEWER REHABILITATION PROJECT The following changes are made to the Contract Documents: (Attach any drawings or other documentation necessary to explain or demonstrate this change.) Original CONTRACT PRICE: $___________________________________ Current CONTRACT PRICE as adjusted by previous CHANGE ORDERS: $____________________________________ The CONTRACT PRICE due to this CHANGE ORDER will be (increased) (decreased) by: $____________________________________ The new CONTRACT PRICE including this CHANGE ORDER will be: $____________________________________ The CONTRACT TIME will be (increased) (decreased) by _______ calendar days due to this CHANGE ORDER. The date of completion of all work will be ________________, 20___. THE CONTRACTOR AFFIRMS, REPRESENTS AND WARRANTS AS OF THIS DATE THAT THERE ARE NO OTHER OUTSTANDING CHANGE ORDERS REQUIRED BY THE CONTRACTOR, OR OUTSTANDING CLAIMS FOR ANY ADDITIONAL MONEY OR COSTS, INCLUDING IMPACT COSTS OR DAMAGES OR CLAIMS FOR TIME EXTENSION, OR CLAIMS OF ANY OTHER KIND OR NATURE AGAINST THE OWNER, EXCEPT THE FOLLOWING: (Describe separately here any such claim, state the total dollar amount and/or time extension sought per claim alleged to be due from the Owner, and the status of the claim as of this date.) ______________________________________________________________________________ ______________________________________________________________________________ Requested by:__________________________________________________________________ Recommended by:_______________________________________________________________ (Engineer’s Signature and Title) 89 AGREED: OWNER AGREED: CONTRACTOR By:_________________________________ By:________________________________ Date:_______________________________ Date:______________________________ 90 APPLICATION FOR PAYMENT OWNER: CITY OF MAULDIN CONTRACTOR: CAJENN CONSTRUCTION & REHABILITATION SERVICES, INC., ENGINEER: FRAZIER ENGINEERING, P.A. NAME OF PROJECT: 2022-2023 SEWER REHABILITATION PROJECT APPLICATION FOR PAYMENT NO.: ____________ CONSTRUCTION PERIOD: FROM: _______________ TO: _________________ ****************************************************************************** SUMMARY OF WORK Total Contract Work Performed to Date: $__________________________________ Materials Stored on Jobsite $__________________________________ Total Change Order Work to Date: $__________________________________ Subtotal to date: $__________________________________ Less 10% Retainage $__________________________________ Subtotal: $__________________________________ Less Previous Payments: $__________________________________ Amount Due This Application for Payment $__________________________________ ****************************************************************************** THE CONTRACTOR BY PRESENTING THIS PAY ESTIMATE STATES, REPRESENTS AND WARRANTS THAT AS OF THE DATE OF THIS REQUEST THERE ARE NO OUTSTANDING CLAIMS ON HIS BEHALF AGAINST THE OWNER FOR ANY ADDITIONAL MONEY, COSTS OR DAMAGES, (INCLUDING IMPACT COSTS OR DAMAGES), OR CLAIMS ARISING FROM DELAY OR FROM THE DENIAL OR THE GRANTING OF TIME EXTENSIONS, OR FROM CLAIMS OF ANY OTHER KIND OR NATURE EXCEPT FOR THE FOLLOWING: (DESCRIBE HERE THE NATURE OF ANY SUCH CLAIMS, THE DATE EACH CLAIM AROSE, THE DATE NOTICE WAS GIVEN PURSUANT TO THE GENERAL CONDITIONS, THE EXACT AND TOTAL DOLLAR AMOUNT CLAIMED, AND THE STATUS OF EACH CLAIM AS OF THIS DATE: ______________________________________________________________________________ ______________________________________________________________________________ 91 The Contractor has attached a Schedule of Values showing all Bid Items included in the BID. The Schedule of Values includes the quantity, location of work performed, and value of work completed for each Bid Item since the previous pay application and the quantity and value of work completed to date for each Bid Item. An itemized spreadsheet is provided with the Application for Payment detailing and documenting the specific location of all work performed since the previous Application for Payment. In addition, by submitting and signing this Application for Payment, the Contractor certifies that progress payments previously received from the OWNER on account of the work for the PROJECT have been applied by the Contractor to discharge in full all of the Contractor’s obligations incurred in connection with the work covered by all prior Applications for Payment, including full payment of materials purchased and full payment to subcontractors. SUBMITTED RECOMMENDED FOR APPROVAL CONTRACTOR: CAJENN CONSTRUCTION ENGINEER: FRAZIER ENGINEERING By: _______________________________ By: _______________________________ Date: _____________________________ Date: _____________________________ APPROVED OWNER: CITY OF MAULDIN By: ________________________________________ Date: ________________________________________ 92 SECT ION 01010 SUMMARY OF WORK AND SPECIAL PROVISIONS PART 1 GENERAL 1.1 SCOPE OF WORK A. PROJECT FUNDING: The Project will be funded by the City of Mauldin’s current ARPA funds allocated to sewer system improvements. There are no special requirements or contract provisions that the Contractor must abide by (no Davis-Bacon Wage issues, no certified payrolls, etc.). B. PIGGYBACK CONTRACT: Work performed under these Contract Documents will utilize existing unit pricing, specifications, and details from Metropolitan Sewer Subdistrict’s (MetroConnects) “FM400B-343 Basin Find & Fix CIPP Project” that was bid on February 10, 2022. The Contractor’s Bid and Specifications from the MetroConnects’ Contract are being incorporated into this Contract. Anywhere MetroConnects or Owner are included in the Documents it shall mean the City of Mauldin. C. This Project will be used to rehabilitate sewers throughout the Owner’s sewer system. It is anticipated that the work will primarily occur in Basins 4 and 5, but work may be issued anywhere within the City’s service area. The Engineer will issue Drawings to the Contractor to define the required work. The Engineer will utilize television inspections of the sewers performed by the Contractor and manhole inspections performed by the Engineer to define the exact required work. The required rehabilitation work may include any of the Bid Items. The work included in this Project may include any of the following work items. - Cleaning and televising existing sewers to evaluate the sewers, identify defects that need repaired, and determine the final rehabilitation to be performed under this Contract - Performing point repairs to existing sewers (via excavation) to repair specific sewer defects; point repairs may be stand-alone repairs with no other rehabilitation to that sewer or repairs to facilitate lining the sewer with CIPP - Replacing sewers from manhole to manhole and installing new manholes (via excavation) (to be paid under the point repair bid item) - Lining existing sewers with cured-in-place pipe lining (CIPP) - Lining specific laterals with CIPP as deemed necessary by the Engineer (the Owner does not own the laterals so any work on laterals 93 wil l be based on very specific needs/defects). - Installing new manholes to replace existing manholes or to provide a manhole where one does not currently exist. - Performing various manhole rehabilitation including locating and raising manholes, replacing and adjusting frames and covers, rebuilding benches and inverts, etc. (manhole coating with spray- applied cementitious mortar is not included in this project – has been completed previously where needed). - Performing miscellaneous work and restoration C. The Contractor will be paid for the actual work completed. The actual amounts of work done under unit price items may differ from the quantities shown in the Bid Form for the MetroConnects’ project (piggyback contract). The basis of payment for work shall be the actual amount of work done. The Contractor agrees that he will make no claim for damages, anticipated profits, or otherwise on account of any difference between the amounts of work actually performed and the estimated amounts shown on the Bid Form – this specification shall take precedence over any other specification(s) related to bid quantities located elsewhere in these Specifications. The total value of work shall not exceed the Contract amount unless approved by the Owner in writing (by a change order or written authorization). The Engineer will continuously review the actual quantities and value of work completed with the Contract amount. The Engineer may need to eliminate some of the work so as not to exceed the Contract amount. Refer to Section 01270 – Measurement and Payment – for description and details of the bid items. D. Contract Time and Liquidated Damages: Notice to Proceed for this Contract is expected to be issued in October 2022. The Contractor shall perform work and achieve Final Completion within 365 days of Notice to Proceed. Final Completion shall mean all work is complete including restoration, acceptance testing, and punchlist items, all requirements of the Contract have been met, and all final paperwork has been submitted so that final payment can be made to include payment of all remaining retainage. Liquidated damages in the amount of $750 per day will be assessed for each calendar day beyond Final Completion. E. State and Local Permits, Licenses, Inspections, and Certificates: The 94 Contr actor shall obtain such required documents and permits and pay the fees assessed for the work for which such permits, licenses, and inspections are required. The Contractor is advised that a City of Mauldin business license will be required for this Project. The Contractor shall contact the City to obtain the license amount. The City will not execute the Contract Agreement until the Contractor obtains the business license. 1.2 OWNER AND ENGINEER A. The OWNER as referenced in these Specifications is the City of Mauldin (City). B. The ENGINEER as referenced in these Specifications is either the City or Frazier Engineering, P.A. who has been retained by the City to design this project and to provide construction administration services on behalf of the City. Communications during this Contract shall be through Frazier Engineering, P.A., located at 6592 Bob White Trail, Stanley, NC 28164 (Phone: 704-822-8444). C. The Engineer and/or the Owner will have an on- site representative to inspect the work as it progresses. 1.3 QUALIFICATIONS A. The Contractor shall be fully qualified and experienced to perform the work included in this Project. Specific experience requirements are included in the Specifications for the cured-in-place pipe lining (CIPP) – refer to Specification Sections 02766, 02767 and 02768. For the excavation work, the Contractor shall be fully experienced in sewer rehabilitation construction including handling wastewater flow through bypass pumping, working around existing utilities and in tight corridors, trench shoring and sheeting including around existing utilities, connecting new sewers to existing sewers and manholes, grass and asphalt restoration including patching, dealing with the public and residents, providing thorough traffic control, and all else required to replace existing sewers and service laterals. Specific project references may be requested by the Owner prior to award of this Contract. B. The Contractor shall submit the anticipated percentage of work that will be performed with his/her forces and the percentage of work that will be performed by subcontractors (based on the bid quantities) at the preconstruction conference. C. The Contractor shall have a written Safety Plan. The Owner may request a copy of the Plan. All personnel working on this Project shall adhere to the 95 Contr actor’s Safety Plan and all other regulations governing this work. All personnel on the project shall be trained and certified to meet OSHA’s Confined Space Entry regulations. Safety and meeting all regulations is the sole responsibility of the Contractor. Unsafe work and entering manholes without following confined space requirements/procedures may result in immediate termination of this Contract by the Owner. Safety shall be of the utmost importance to the Contractor at all times. The Contractor shall continuously comply with all safety requirements from all regulatory agencies. D. The Contractor shall hold any and all other necessary qualifications, certifications, training, etc. that may be required to complete this Project, including any traffic control training/certifications that may be required, use of software, use of equipment as recommended by equipment manufacturers and suppliers, etc. E. Subcontractors shall also meet the specified qualifications and requirements. The Contractor shall submit information on any proposed subcontractor prior to performing any work. The Owner may request this information after receiving bids and prior to Contract award. The Owner must approve any subcontractor and reserves the right to reject any subcontractor. The Contractor shall not be due any additional money if subcontractors are not approved. 1.4 PROJECT MANAGEMENT AND SUPERVISION A. The Contractor shall provide adequate project management and supervision throughout this Contract. At a minimum, the Contractor shall provide a full-time, Project Manager and a full -time, on-site General Superintendent. The Contractor is advised that management and supervision of this Project will be extensive and take significant time and effort. In addition, each crew, including subcontractor’s crews, must have an experienced, English - speaking foreman. The Contractor’s General Superintendent(s) must be on-site to observe the work at all times when work is being performed, including work performed by subcontractors. Work shall cease whenever the General Superintendent(s) is not on- site to observe the work. The Engineer may allow the Contractor’s foremen to act on behalf of the General Superintendent if so requested but will not allow subcontractor’s foremen to act in such a manner. The Contractor’s General Superintendent(s) must observe all work performed by subcontractors. B. The Contractor’s full -time Project Manager shall manage and supervise this Contract throughout its duration. The Project Manager shall have a minimum of 5 years of experience managing and supervising this type of construction, including excavation, sewer rehabilitation work, and ma nhole 96 rehab ilitation, backed up by project references. The references must clearly indicate that the proposed person acted as the Project Manager. The Project Manager’s obligations, duties and responsibilities shall include, but not be limited to, the following: 1) serve as main point of contact for Engineer and the City with authority to act on behalf of the Contractor 2) prepare, process, submit and administer shop drawings and other submittals 3) perform field engineering 4) coordinate with property owners and the public 5) coordinate with other utilities 6) coordinate with the DOT 7) prepare and process proposals, change orders, field orders, etc. 8) administer and coordinate subcontracts to ensure that quality work is being performed 9) coordinate, prepare and submit all required schedules and accurately update schedules for presentation at progress meetings 10) prepare, modify, coordinate and administer payment applications 11) prepare accurate and complete record drawings 12) provide general quality control to ensure that all Contract work meets or exceeds the Contract requirements 13) attend all project meetings C. The Contractor’s full-time, on-site General Superintendent(s) shall be on - site during all construction activities including work by subcontractors. The General Superintendent (s) shall have at least 5 years of experience managing and supervising this type of construction, including excavati on, sewer rehabilitation work, sewer lining, and manhole rehabilitation, and supervising subcontractors as backed up by project references. The references must clearly indicate that the proposed person(s) acted as the General Superintendent. The General Superintendent’s obligations, duties and responsibilities shall include, but not be limited to, the following: 1) serve as main contact point for Engineer’s on-site representative 2) work with Engineer’s on- site representative to ensure a high quality project t hat meets the Engineer and the City’s expectations and the Contract requirements - failure to work with the Engineer’s on- site representative in good faith shall result in removal of the superintendent from the job and replacement with a suitable superintendent 3) coordinate all work and work schedules with the Engineer’s on- site representative 4) supervise all field work including work of Contractor’s forces (foreman, laborers, etc) and subcontractors 97 5) ensur e that all discussions with the Engineer’s on- site representative are implemented by Contractor’s forces 6) coordinate with property owners and the public and supervise the distribution of project notifications 7) ensure that all approved submittals and traffic control plans are being followed and implemented by Contractor’s forces 8) review quantities being requested for monthly payment applications with the Engineer’s on-site representative 9) provide general quality control to ensure that all Contract work meets or exceeds the Contract requirements 10) attend all project meetings D. Each foreman proposed to act as such on this Contract must have a minimum of 2 years experience as a foreman for the specific work he/she is proposed to supervise. References must be submitted to demonstrate that the proposed person(s) have the required experience. The references must clearly indicate that the proposed person(s) acted as a foreman. E. The resumes and project references (names and phone numbers) of the proposed Project Manager, General Superintendent(s) and foremen shall be submitted to the Engineer and Owner for review and approval prior to the preconstruction conference. The Engineer and Owner will contact references to determine if the proposed persons meet the requirements specified herein. The findings of the Engineer and Owner will be issued prior to the preconstruction conference if adequate time is available or at the preconstruction conference. The Engineer and Owner may request interviews with the proposed person(s). The Engineer and Owner’s decision on the acceptability of the proposed person(s) shall be final, and the Contractor shall immediately propose alternate personnel that meet the specified requirements if the proposed person(s) is denied. No waivers of these requirements shall be permitted. No work shall begin until the Project Manager, General Superintendent and foremen are approved and are on-site working on this project. F. The Contractor shall not replace or substitute the Project Manager, General Superintendent(s) and foremen without obtaining prior approval from the Engineer and Owner. The Contractor shall make any such request to change supervision in writing, and the Owner and Engineer will respond within 10 business days of the request. Work shall cease on the project any time such a change is made until approval of new supervision is granted to the Contractor. Additional or alternate supervisory personnel must meet all of the above requirements. 98 G. Paym ent for all project management and supervision shall be a mandatory subsidiary obligation under the Contract, and no separate payment will be made by the Owner. PART 2 PRODUCTS 2.01 SUBSTITUTIONS AND PRODUCT OPTIONS A. The Specifications include specific product names that are approved for installation in this Contract. Whenever a product name is specified followed by the phrase “or equal,” the specific product mentioned shall be the basis upon which bids are to be prepared, and shall be understood as establishing the type, function, dimension, appearance and quality desired. B. Other manufacturer's or vendor's products not named will be considered as substitutions if a written req uest for such substitution is made at least seven (7) days prior to the scheduled bid opening. The requests for substitution shall include complete data (including product literature, reference standards and performance and test data) substantiating compliance of the proposed substitution with the requirements stated in the Specifications. A list of product installations by the Contractor and proposed superintendent/foreman including quantities installed, dates of installation, and references (name, address, and phone numbers) shall also be submitted. Any approved substitutions and/or additions may be made by addendum or by written approval (letter or e-mail). C. The requests for substitution must include a written and signed statement from the Contractor a nd/or manufacturer stating that the Contractor/manufacturer will adhere to all parts and requirements of the Specifications outlined herein and that no exceptions to any part of the Specifications will be taken. D. The Owner’s/Engineer's decision regarding evaluation and acceptance of substitutions shall be final and binding. 2.02 SEWER AND MANHOLE MATERIALS A. All point repairs shall be made using ductile iron pipe (P ressure Class 350) or PVC pipe as specified by the Engineer. In general, PVC pipe shall be used when the point repair will be lined over with CIPP , and ductile iron pipe shall be used when the point repair is a stand- alone repair. New main sewer pipes installed from manhole to manhole shall be either SDR -26 PVC or Pressure Class 350 ductile iron as specified for each replacement. Ductile iron pipe does not require Protecto 401 coating. SDR-35 PVC shall not be used on this contract. B. New service lateral connections inst alled within point repair segments shall be made using ductile iron tee-wyes only. When the point repair is made using PVC 99 pipe, pr ovide appropriate transition gaskets to the ductile iron tee -wye. When the sewer is being replaced from manhole to manhole, the service tees or wyes shall match the new main sewer pipe material. New service lateral pipes shall be SDR 26 PVC or Pressure Class 350 as specified. C. Manholes shall be as specified in the standard specifications and details. 2.03 S PECIAL EXCAVATION AND BACKFILL REQUIREMENTS A. The standard excavation and backfill requirements for this Project allow the excavated soil to be used for backfill as long as the soil is suitable for backfilling . If the excavated soil is not suitable as agreed to by the Engineer, then imported select fill or ABC stone shall be used for backfill. Such imported material will be paid at the unit prices bid. B. In some circumstances such as in SC DOT or City /County roads, the excavated soil may not be allowed for backfill and ABC stone or flowable fill may be required for backfilling the trench. Payment will be made for ABC stone and flowable fill as required and as directed by the Engineer at the unit prices bid (as applicable). C. Soil density testing may be performed and paid for by the City. PART 3 EXECUTION 3.1 P ROJECT MEETINGS A Preconstruction Meeting shall be held prior to performing any work. The Contractor, his proposed Project Manager and full-time on-site Project Superintendent and any proposed subcontractors shall attend the meeting. The project scope, requirements and submittals as specified herein will be reviewed and discussed. The Contractor shall present the proposed project schedule at the preconstruction meeting. Other meetings will be held throughout the Project as deemed necessary (expected to be monthly at a minimum). The Contractor shall provide updated schedules at all meetings. 3.2 PUBLIC NOTIFICATION A. The Contractor shall continuously notify the public of the work being performed. At a minimum, the Contractor shall be required to do the following: 1. The Contractor shall distribute a letter describing the overall project and work to be performed to all property owners in the project area. The letter shall be distributed at least 1 week and no more than 2 weeks prior to performing any work in the area. The Engineer will provide the context for the letter. The 100 Contr actor shall put the letter on his letterhead and shall include contact names and local phone numbers for the Contractor’s project manager, superintendent, and the Engineer’s or Owner’s on-site representative. 2. The Contractor shall distribute door hangers to each property owner affected by the work 72 hours prior to performing any work. The Contractor shall submit a sample door hanger to the Engineer and Owner for review. The door hangers shall include the specific work to be performed, contact names and local phone numbers for the Contractor’s project manager, superintendent, and the Engineer’s on -site representative. Door hangers will be required for each phase of the work unless approved otherwise by the Engineer. B. Payment for all public notification shall be a mandatory subsidiary obligation under the Contract, and no separate payment will be made by the Owner. 3.3 WEEKLY WORK SCHEDULES AND WORK COMPLETE FORMS A. The Contractor shall submit a weekly construction schedule for the upcoming week by noon every Friday. The schedule shall define all construction activities for the week including specific work between specific manholes. If changes occur to the schedule, the schedule shall be immediately updated and resubmitted to the Engineer. The Engineer may request that the construction schedules be submitted to other agencies such as SCDOT . Work not scheduled shall not be performed or approved for payment. B. In addition, the Contractor shall submit to the Engineer work complete forms every Friday. The work complete forms shall document all work completed during the week, including quantities for each bid i tem, and shall list all equipment used during the week and all personnel on the job each day. 3.4 WORK HOURS A. Normal work hours shall be 8:00 am to 5:00 pm, Monday through Friday, except for legal holidays observed by the Owner when no work shall be performed. A normal work week shall be defined as 40 hours. It is anticipated that work in residential areas and easement areas will be completed during the normal work hours. B. For work in major thoroughfares, the SCDOT may require that the work be performed between 9:00 am and 4:00 pm or from 7:00 pm to 6:00 am or on weekends. No additional payment shall be made to the Contractor for working within these restricted work hours. Work hours in major thoroughfares must be approved in advance by SCDOT and the Owner/Engineer. 101 C. Any re quests to work at times different from those specified or requests to work longer than the normal 40- hour work week shall be made in writing by the Contractor to the Engineer. Requests shall be made at a minimum of 72 hours prior to the requested change. The Engineer will review such requests and issue a decision on the request. The Engineer’s decision shall be final, and no additional money shall be due the Contractor based on the final decision. The Contractor shall not assume that overtime work will be allowed. D. If weekend work is required or agreed to by the Engineer, the Contractor shall work the specified weekend (6 hour minimum workday), unless work is prevented due to bad weather. Should the Contractor choose not to work the specified weekend due to reasons other than bad weather, then the Engineer may not allow the Contractor to work the following weekend. This restriction will not be grounds for delay, additional costs, or changes in work. The Contractor shall not assume that weekend work will be approved. Should bad weather prevent the Contractor from working the specified weekend, then the Contractor may work the following weekend, provided that a proper request is made by the Contractor and the Engineer approves the request, as specified. 3.5 ACCESS TO THE PROJECT SITES The work under this Contract will be in easement areas along creeks, easement areas in yards, in residential roads and parking lots, and/or in major thoroughfares. The Contractor shall be solely responsible for accessing the sewers and manholes to perform the work, including determining access requirements and developing alternate access points as required, removing and replacing to equal conditions moveable obstacles (such as fences), clearing and mowing right-of-ways as required, negotiating with property owners, and restoring all areas disturbed by the work to equal or exceed preconstruction conditions (including repairing ruts, seeding and mulching, replacing moveable objects, etc.). The Contractor is advised that the easement areas will change throughout the year, and the condition of the easements may be different when the work commences compared to the conditions at the time of bidding. Easement areas will become wet during rainy periods and may become overgrown with brush and vegetation during typical growing periods. Access shall be along the existing sewer easements or within the existing road rights-of-way and work shall be maintained within the easements and rights-of- way unless otherwise approved by the individual property owners and/or the Owner. The Contractor shall be responsible for negotiating with property owners for such alternate access and shall pay any and all costs associated with such alternate access as specified above. All such negotiations with property owners shall be in writing, and copies of the agreements shall be submitted to the 102 Engine er prior to using the access. The Contractor shall perform preconstruction videoing and photographing prior to any work, including accessing the sewers, as specified further herein. The Contractor shall submit his/her proposed plan for accessing the sewers and manholes to the Owner for review and approval. The proposed plan shall be detailed and shall define each access point. The Contractor shall modify the plan as required by the Owner. The costs for accessing the sewer shall be included in the various unit prices bid. No separate payment will be made for accessing the sewers and manholes. 3.6 TRAFFIC CONTROL The Contractor shall submit to the Owner a detailed traffic control plan for performing all phases of the work at least two weeks prior to performing the work in residential roads and t hree weeks prior to working in major thoroughfares . The traffic control plan shall be specific to each road and each sewer and manhole and shall adhere to the requirements of SCDOT ’s "Manual on Uniform Traffic Control Devices" (MUTCD). The traffic control plans must be approved and the encroachment permit issued by the City/County and/or SCDOT prior to performing any work on the roads. The traffic control plan shall be modified as necessary in the field , at no additional cost, to accommodate unforeseen traffic control issues and problems and safety concerns as identified by the Contractor, Owner, other City personnel and/or the SCDOT. The Contractor shall perform and provide all necessary traffic control measures to complete the work. No roads shall be closed for construction activities unless specifically approved in writing by the Engineer. At least one lane of traffic shall be safely maintained at all times wh ile work is in progress. Access to businesses and residences along the roads shall be maintained at all times. All lanes shall be open when work is suspended for one hour or longer. Signs and barricades must be removed from the site when work is no longer being performed, even during short breaks in the work (such as lunch breaks). The Contractor shall provide all appropriate signage and barricades and shall provide flag persons at all times and places necessary. Traffic control will be strictly enforced in order to provide fire and police protection to the area and access to drives while construction is in progress. Occupants must be notified a minimum of two (2) hours in advance of private drive closings. Closure time will be limited to a maximum of 2 hours. Where businesses have only one means of access, the Contractor shall provide an alternative means of access or perform work during hours when the business is closed. 103 Traffi c control is a mandatory subsidiary obligation under the Contract, and all costs of traffic control shall be included in the various unit prices bid – no separate payment will be made for any traffic control requirements. 3.7 MAINTENANCE OF FLOW IN EXISTING SEWERS The Contractor is responsible for handling and accommodating all existing wastewater flows during the work. The Contractor will be required to submit, for approval by the Engineer, a detailed plan of the method the Contractor proposes in order to maintain the existing flow during construction. If bypass pumping is proposed, the plan must include a provision for handling the existing peak flow by pumping. When pumping is used, an identical standby pump(s) shall be on site in the event of failure of the primary pump(s). Pumps 4” and smaller may use flexible piping. Pumps 6” and larger must use rigid piping. All discharge piping must be continuously monitored for leaks. If any problems arise with handling the flow with the available pumps or with the discharge piping, the plugs in the sewers shall be immediately removed, the flow shall be returned to gravity flow, and the work shall cease until repairs/modifications are made. No overnight pumping shall be allowed – temporary tie-ins at th e end of the work day or work week shall be made as necessary. Sewer system overflows will not be tolerated. All fines imposed on the Owner associated with overflows caused by the Contractor’s work shall be paid by the Contractor. Sewer overflows may lead to immediate termination of the Contract. Maintaining the flow while performing the work is a mandatory subsidiary obligation under the Contract, and all costs shall be included in the various unit prices bid – no separate payment will be made. 3.8 WATER SUPPLY It shall be the Contractor's responsibility to purchase and convey the necessary water to any location at which it is required on the Project. Water can be purchased from the Greenville Water Systems (GWS). The Contractor shall meet with GWS to obtain approval/permits to use GWS’s hydrants for this Project. The Contractor is responsible for meeting all of GWS’s requirements, obtaining all permits and paying for all water used. The Contractor shall follow all GWS procedures for connecting to hydrants and shall be responsible for any damage caused by improper operation of hydrants. The Contractor is responsible for meeting all requirements whether listed herein or not. Every truck connecting to hydrants must have an air gap or backflow prevention device. The Contractor shall obtain a letter from GWS stating that the Contractor and any Subcontractors are authorized to connect to hydrants for water usage during this 104 Pro ject. A copy of this letter shall be submitted to the Owner. Upon completion of the Contract and prior to final payment, the Contractor shall obtain a letter from GWS stating that all water has been paid for and shall submit a copy of this final payment letter to the Owner. 3.9 DISPOSAL OF DEBRIS The Contractor shall be responsible for disposal of all unused or unsuitable trench material excavated or encountered in the work that is not used for completion of the work. The Contractor shall also be responsible for disposal of all debris removed from the sewers during cleaning operations. A dump site is not being provided by the Owner. However, the Renewable Water Resources (ReWa) in Greenville, SC has previously made their sludge drying beds at their Mauldin Road WRRF facility available for dumping material from sewer cleaning. If approved by ReWa, the Contractor shall meet all of ReWa’s requirements for utilizing their drying beds. 3.10 SHOP DRAWINGS Shop drawings are required for all materials proposed for installation under this Contract. The Contractor shall submit complete shop drawings for all materials proposed for each bid item within 30 days from the Notice to Proceed. The Engineer will review the shop drawings and provide comments to the Contractor within 14 days of receipt of the shop drawings. 3.11 PRE-CONSTRUCTION VIDEO INSPECTIONS AND PHOTOGRAPHY The Contractor shall video and photograph all project/work areas (street and off- road areas) prior to performing any work, including accessing the manholes/sewers, to document pre-work conditions in case future complaints arise. The inspections shall be narrated to document locations and dates of video inspections. The photographs shall be date stamped. One digital copy of the photographs and videos shall be submitted to the Owner prior to starting any work. This is a mandatory requirement under this Contract and the costs associated with this work shall be included in the various unit prices bid – no separate payment will be made. The purpose of the inspections and photographs shall be to document the pre- construction conditions for comparison with the final restoration work. If the videos/photographs are not complete and not comprehensive to cover all of a work area, the Contractor will be responsible for addressing all complaints that appear to be (or could possibly be) the result of his work, in any manner necessary to completely resolve the complaint, at no additional cost to the Owner. 105 3.12 COOR DINATION OF CONTRACTORS The City may have additional contractors in the project areas during this contract. These other contracts may pre -date or post -date this contract. The work being performed under these other contracts may include other sewer rehabilitation work or other City work (sidewalks, roads, parks, etc.). The contractor shall coordinate his work with any other City contractor working in the area. No additional payment will be made for this required coordination. 3.13 WORK WITHIN THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION (SCDOT) RIGHT-OF-WAY An encroachment agreement (or similar agreement) will be required when work occurs within the South Carolina Department of Transportation ( SCDOT) right- of-way. In such case, the City will obtain the encroachment permit. The Contractor shall provide work plans/details and traffic control plans as necessary and required to obtain the encroachment permit. The Contractor shall perform all work within the SCDOT right-of-way in substantially the manner outlined in the encroachments issued by them and keep a copy of same at the construction site at all times. The Contractor shall hold all certifications required by the SCDOT for working in their road right-of-way, including traffic control, excavation, etc. The Contractor will notify the City twenty -four (24) hours prior to commencing any construction within the SCDOT ’s right -of-way. The SCDOT may require restricted working hours or weekend work as specified elsewhere herein. SCDOT may also require backfilling trenches with ABC stone or flowable fill (to be paid at the unit prices bid). As always, the Contractor shall be required to maintain all traffic, furnish all barricades and flashers, flagmen and pilot cars when necessary. Refer to the TRAFFIC CONTROL section of these Special Provisions for additional requirements. The Engineer and/or Owner will identify SCDOT roads as the work progresses. 3.14 MAP CONFIRMATION AND UPDATES At the start of the project, the Contractor shall walk the sewers to be cleaned and televised to locate manholes and identify additional manholes not shown on the drawings. The Contractor shall note any added manholes and notify the Owner/Engineer so manhole numbers can be assigned prior to starting the TV inspections. In general, additional manholes that are found during the inspections shall be numbered as the downstream manhole number followed by a “ A”. The Contractor shall also update the drawings to show any changes based on the 106 actual sewer layout. These “red -line” markups shall be submitted to the Owner/Engineer along with the TV inspections. 3.15 SURVEYING REQUIREMENTS The Contractor is responsible for performing all surveying required for completion of this Project and the various work items included in the Bid. The costs for all surveying shall be included in the various unit prices bid – no separate payment shall be made. For sewer replacements from manhole to manhole, the Contractor shall survey the sewers at each manhole (sewer in and out at each manhole) for the extent of the replacement work to identify the existing sewer slopes and any elevation changes through the existing manholes. The Contractor shall also survey the next upstream and downstream manholes so that a comprehensive decision can be made on the extent of the required replacement work. The survey information shall be submitted to the Engineer for review and determination of the slope for the new sewer(s). The survey shall be completed and subm itted at least two weeks in advance of the replacement work to provide adequate review time for the Engineer. 3.16 SOIL AND EROSION CONTROL The Contractor shall protect against soil erosion into nearby streams and storm drains at all times. Minimum erosion control requirements shall be as shown on the Drawings (where applicable). The Contractor shall install silt fence along the downstream side of all construction activities and provide inlet protection around all catch basins/storm inlets whether shown on the Drawings or not. Any water removed from excavations during dewatering shall be filtered to remove sediments before being discharged to the creek or the sanitary sewer system (when approved by the Engineer). The Contractor shall add additional erosion control devices throughout construction as deemed necessary and as required by the Owner, Engineer or regulatory agencies. The erosion control devices shall be installed prior to performing any work including clearing and shall be maintained throughout construction. Construction entrances shall be provided at all off-road work sites. All erosion control devices shall be checked continuously and immediately after rain events. Repairs to erosion control devices shall be made immediately when identified. Silt fences shall remain functional until all restoration has been performed and the restoration is accepted by the Engineer/Owner. An adequate stand of grass will be required prior to removing silt fences. The Contractor shall remove all erosion control devices upon completion of the work and completely restore disturbed areas. Contractor shall obtain the Engineer’s approval prior to removing erosion control devices. 107 As pa rt of the soil and erosion control measures, where practicable, trenches should be filled, covered and temporary seeding applied at the end of each day. Stabilization measures shall be initiated as soon as practicable, but in no case more than 14 days after work has ceased in that area. 3.17 COORDINATION WITH EXISTING UTILITIES The Contractor shall contact 811 to locate existing utilities in the area prior to performing any excavation. The Contractor shall locate existing utilities and facilities not located by the locating company. The Contractor shall closely coordinate with utility companies including Duke Power, Piedmont Natural Gas, Greenville Water Systems, City/County, cable TV, phone companies and others. The Contractor shall be responsible for protecting all existing utilities during the work and shall repair any damage to the satisfaction of the utility owner. If the utility company fixes the damage, the Contractor shall pay for the repair if required. Some existing utilities may be shown on the Drawings. The locations shown shall be considered approximate only. Most (or all) of the existing utilities may not be shown. The Contractor shall determine actual locations of all utilities within the construction area. The Contractor is advised that the project areas may be congested with existing utilities, and existing utilities will cross sewer trenches and run parallel with sewer trenches. The Contractor shall accommodate and protect all existing utilities regardless of location and shall be responsible for repairing all damage to the utilities – no separate or additional payment shall be made for accommodating and protecting existing utilities. 3.18 UTILITY POLES The Contractor shall note that the work may be located near existing utility pole and guy wires. The Contractor shall make all necessary arrangements with the various utilities to protect the poles and guy wires and make any necessary relocations of same if field conditions require, as determined by the Engineer and the utility owners, and at no additional cost to the Owner. 3.19 TRENCH BACKFILL A. Backfill of the trench shall be accomplished immediately after the pipe has been installed. No more than fifty (50) feet of trench shall be opened at any given period of time. Backfill of the trench shall commence immediately following pipe installation. This will be enforced in order to minimize the amount of open trench. Backfill and compaction activities will be on-going operations. 108 B. The C ontractor shall backfill around the pipe to an elevation of one (1) foot above the pipe bell by hand only. Remaining backfill and compaction shall be as specified. All excavations will be completely backfilled by the end of each workday. 3.20 TRENCH EXCAVATION A. The Contractor will be required to provide a trench box or sheeting and shoring in accordance with OSHA regulations. The Contractor will not be allowed by the Engineer to slope trench walls. The Contractor will be required to sheet, shore, and work from within a shoring box, etc., and do all that is necessary to maintain minimal trench widths and still meet OSHA requirements for this construction. No trenches shall be left open overnight. Any additional cost shall be included in the various pay items in the Bid. The Contractor will submit shoring details, when requested by the Engineer, for review and approval by the Controlling Agency. The Contractor is advised that existing utilities will cross and run parallel to sewer trenches, so the sheeting/shoring plan must accommodate any and all existing utilities. 3.21 SHORING AND SHIELDING A. The Contractor shall comply with OSHA trenching and excavation regulations as revised in Subpart P of Part 1926 in the Federal Register. Shoring and/or shielding systems shall be used as specified in Subpart P to prevent caving of trench banks and to provide a safe excavation. These requirements will also apply to bore pits and/or tunnels. B. The Contractor will be responsible for excavation safety and shall designate his “competent person” (as defined in Subpart P) for the determination of proper shielding/shoring systems. C. If, in the opinion of the Engineer, the trench/excavation is not in compliance with OSHA regulations, the Contractor may be directed to stop work. Continued unsafe conditions will be reported to the appropriate regulatory agency. The Contractor will be responsible for paying all fines resulting from safety violations. 3.22 RESTORATION The Contractor shall be responsible for restoring all areas affected by the work to equal or exceed pre -construction conditions. All restoration work shall be performed in accordance with the standards and specifications. Restoration work shall be performed daily to restore areas disturbed during that day including pavement. If requested by the Contractor, the Engineer may allow the Contractor to perform the restoration work one day per week (at the end of the 109 wor k week). However, if complaints are recei ved from the City, State, or residents, the Engineer will require that daily restoration be performed. 3.23 RESTORATION OF GRASSED AREAS The Contractor shall be responsible for restoring all grassed areas affected by the work to equal or exceed pre-construction conditions. Restoration of grassed areas shall be performed at the end of each day unless otherwise approved by the Engineer. The costs for restoring grassed areas via seeding and mulching including all requirements specified below shall be included in the various bid items - no separate payment will be made. Payment will not be made for the various work items until the restoration is complete and satisfactory to the Engineer unless otherwise approved by the Engineer. The Engineer will consider in such a decision whether the Contractor is using the subject areas for accessing the upstream work in which case the area cannot be restored. Final payment will not be made until all areas are completely restored to the satisfaction of the Engineer and property owner. Refer to the Drawings for additional requirements. The Contractor or his subcontractor performing excavation work in grassed areas shall initially be considered acceptable to perform the restoration work. However, if the Contractor’s work is not satisfactory to the Engineer, Owner or property owner(s), the Contractor shall hire a local, professional landscaping company to perform the work at no additional cost to the Owner. The Contractor should consider retaining a local landscaping company during the 1-year warranty period to handle all complaints and warranty issues. All grassed areas disturbed by the work under this Contract may be either seeded and mulched or sodded. The Engineer/Owner must agree with the choice of restoration recommended by the Contractor prior to any grassing being done (some areas on the Drawings may be designated to have specific type or method of grassing at that location). The seeding or sodding work shall be performed as follows: Seeding and Mulching: The grass variety/species shall match the existing grass and shall be new seed and free of weeds and contamination. The Contractor shall submit the proposed seed mix along with the seed manufacturer’s recommendations for lime, fertilizing, planting, watering, and maintaining. All such recommendations shall be strictly followed. For easement areas through the woods, where little or no grass may exist, the Contractor shall plant a mixture of fescue and rye. The mixture rate including fertilizer shall be as follows or as recommended by local nurseries for fescue/rye in easement areas (all rates below are in pounds per 1000 square feet): 110 5 lbs K entucky Fescue No. 31 3 lbs Rye Grain (sometimes approved to add millet) 20 lbs Fertilizer (5-10-10) 100 lbs Lime 12 lbs Superphosphate For all seeding work, the Contractor shall provide clean, finely graded topsoil for the top 4 inches. The Contractor may strip the top 4 inches of soil prior to excavation and stockpile this topsoil in a separate pile for use if the existing soil is suitable. If the existing soil is not suitable, the Contractor shall import approved, clean topsoil for use. The cost for providing and importing all necessary topsoil shall be included in the various unit prices bid – no separate payment shall be made. Prior to any planting, the Contractor shall grade all easement areas (non- yard areas) smooth as approved by the Engineer/Owner in the field. The Owner must be able to drive heavy sewer maintenance equipment along the sewer route to access every manhole unless otherwise approved. In addition, slopes of easements shall be such that the Owner can mow the easements with bush-hog equipment. There shall be no ruts or wash-out areas in the easements and no exposed rock or debris. The Contractor shall install culvert pipes or large stone (such as SCDOT No. 3 surge stone or rip-rap where approved) for draining easement areas as necessary and as required by the Engineer/Owner. All exposed tree roots shall be cut, all trees completely removed or stumps ground to 12 inches below grade (where approved by the Owner), and all damaged tree limbs cut and removed. The final grading of all easement areas must be approved by the Engineer/Owner prior to planting any grass. The top 4 inches of soil shall be clean, fine graded topsoil, either stripped and stockpiled or imported. For yard/lawn areas, the Contractor shall grade areas to be a smooth, even surface with loose, fine textured soil. The area shall be rolled and raked. High spots shall be removed, and low spots shall be filled with suitable topsoil to meet finish grades. As specified above, the top 4 inches of soil shall be clean, fine graded topsoil, either stripped and stockpiled or imported. Fine grading should be limited to areas which can be planted in the immediate future. After fine grading and prior to planting, restore prepared areas to the above specified condition if eroded or otherwise disturbed. Prepared areas shall be moistened before planting lawn. The Contractor shall lime and fertilize the soil prior to planting as recommended by the seed manufacturer, spread seed at the recommended 111 rates , mulch area with clean wheat straw, and water area immediately after planting as recommended. It is recommended that the Contractor take soil samples so that proper lime and fertilizer rates can be determined. Contractor shall maintain the planted area for at least 30 days and until completely established. Maintenance shall include watering per the seed manufacturer’s recommendations (at least 1 inch of water per week including rain), re-fertilizing as recommended and required, and cutting the grass to continue healthy growth as required. Contractor to submit watering and maintenance schedule to Engineer. Water used shall be provided by the Contractor. Property owners shall not be involved in watering operations unless the property owner requests that they be allowed to water the grass, and the Engineer approves. Grassed areas will be acceptable provided requirements, including maintenance, have been complied with, and a healthy, well rooted, even colored, viable grass is established that is free of weeds, bare areas, and surface irregularities, to the satisfaction of the Engineer/Owner and property owner. All bare areas shall be re-seeded and maintained until accepted by the property owner and approved by the Engineer/Owner. Sod Restoration: At the Contractor’s option and in specific areas identified by the Engineer/Owner, the grassed areas disturbed by the work may/shall be sodded. When sod restoration is selected or required, the Contractor shall provide new sod. The Contractor shall match exactly the species of the existing grass including providing strongly rooted (2" minimum thick root mat), certified sod, not less than 2 years old and free of weeds and undesirable native grasses. Sod must be capable of growth when planted. As specified above for seeding and mulching, the top 4 inches of soil shall be clean, fine graded topsoil, either stripped and stockpiled or imported. The Contractor shall grade lawn areas to a smooth, even surface with loose, uniformly fine texture, roll and rake, remove ridges and fill depressions to meet finish grades, add suitable topsoil to any portion or the entire area which does not meet finished grades, limit fine grading to areas which can be planted in the immediate future, moisten prepared lawn areas before planting lawn, and restore prepared areas to specified condition if eroded or otherwise disturbed, after fine grading prior to planting. The Contractor shall lay sod within 24 hours from time of stripping. The sod shall be laid to form a solid mass with tightly fitted joints with ends and sides of sod strips butted, not overlapped. Strips shall be staggered to offset joints in adjacent courses. Work shall be performed from boards to avoid damage to subgrade or sod. The sod shall be tamped or rolled lightly 112 to ens ure contact with subgrade. The Contractor shall work sifted soil into minor cracks between pieces of sod, remove excess to avoid smothering adjacent grass and water sod with fine spray immediately after planting so that entire sod blocks are moist but not soggy. Begin maintenance of lawns immediately after planting and continue for at least 30 days and until completely established. Maintain lawn by watering and other operations such as rolling, regrading and replanting as required to establish a smooth, acceptable lawn, free of eroded or bare areas. Watering schedule shall be as recommended for that type of sod by local nurseries and shall be at least 1 inch of water per week including rainfall. Contractor to submit watering schedule to Engineer. Water used shall be provided by the Contractor – property owner(s) shall not be involved in watering operations unless requested by the property owner(s) and approved by the Engineer. Contractor shall also lime and fertilize as recommended by local nurseries. Sodded lawns will be acceptable provided requirements, including maintenance, have been complied with, and healthy, well rooted, even colored, viable lawn is established, free of weeds, open joints, bare areas, and surface irregularities, to the satisfaction of the Engineer and property owner. All bare areas shall be re-sodded. 3.24 RESTORATION OF PAVED AREAS Pavement restoration shall be in accordance with the Drawings, Specifications and SCDOT standards. All materials shall meet SCDOT standards. All installation shall be in accordance with SCDOT standards. Bid items are provided for asphalt restoration in accordance with the various Standard Details. For asphalt restoration, payment shall be limited to a width equal to the maximum trench width (as defined in the specifications and/or details) plus 5 feet and to a length equal to the length of the required work plus 6 feet. The Contractor shall not be paid for any restoration outside of these limits unless specifically approved by the Engineer prior to the specific work. For concrete restoration, sod restoration and gravel restoration, the Engineer shall define the limits prior to starting the required work. The Contractor is advised that the asphalt pavement may be underlain by 12 inches or more of concrete that must be cut through and replaced whenever excavation is performed. The location and extent of such concrete underlayment is not known but has been previously found under SCDOT roads. B id items are included for removal and disposal of pavement (asphalt and concrete) 6 inches and thicker. The cost to remove asphalt and concrete that is less than 6 inches 113 thic k shall be considered incidental to the work and all costs shall be included in the various unit prices bid. All unit prices bid shall include adjusting manhole frames/covers and appurtenances on all other existing utilities (such as water valve boxes) to final asphalt elevations (after milling and overlay). 3.25 FENCE REPLACEMENT Existing fences that are disturbed during construction shall be repaired or replaced to a condition equal to or better than the origina l unless a release is obtained from the property owner and submitted to the Engineer. All fences shall be replaced immediately after construction has cleared the fence line. The costs to remove and replace the existing fences shall be considered incidental to the work and shall be included in the various unit prices bid. If the existing fence is not salvageable and a new section required, as agreed to by the Engineer prior to any work in the area and prior to removing the existing fence, a price shall be negotiated and payment made from the contingency item, as approved and directed by the Engineer. If the Contractor does not obtain the Engineer’s approval for new fence material prior to removing the existing fence, the Contractor will be responsible for installing the new fence at no cost to the Owner. 3.26 MAILBOX/STREET SIGN REPLACEMENT The Contractor, along with the Owner’s and/or Engineer’s representative(s) , will measure all mailboxes and street signs horizontally from edge of pavement and vertically from finish ground prior to removal. The Contractor and the Owner’s and/or Engineer’s representative(s) will log these measurements at each location to ensure proper replacement. Street signs shall be replaced immediately after construction at that location. Mailboxes shall be replaced by the end of the business day or no more than 2 hours after removal. The cost of this work shall be included in the various bid items – no separate payment will be made. 3.27 EQUIPMENT IDENTIFICATION SIGNS All motorized construction equipment, trucks, vehicles, and storage trailers, etc. used (owned, leased, rented or borrowed) by the Contractor on this project shall be equipped with a pair of signs to identify the Contractor . The signs shall be permanently or magnetically attached to each side of the equipment at all times. 3.28 TREE PROTECTION All trees located in the road right-of- way and along the sewer easements shall be protected from damage by this construction. Barriers shall be installed around each tree to remain. The barrier shall be a suitable temporary fence and shall be 114 insta lled around the drip line of the tree (around the outside of the overhanging tree limbs) unless otherwise approved by the Engineer. No equipment, construction materials, topsoil, fill dirt or any other material shall be placed within the barrier. Nothing shall be nailed or attached to the tree. Any trees that are damaged shall be repaired as approved by the Engineer. An Arborist, paid for by the Contractor, may be required to recommend repair of severely damaged trees. Recommendations by the Arborist shall be strictly followed. Severely damaged trees may require replacement with a like-kind tree. Any tree that dies (including during the warranty period) as a result of the work shall be replaced with a like-kind tree including size to the extent possible. Tree replacement shall be approved by and acceptable to the property owner and Engineer. 3.29 CLEANUP WORK The Contractor shall completely clean up the work site at the end of each day. The cleanup work shall include washing streets with high pressure water, removing debris, and removing stockpiled materials and equipment from the site as necessary. If request ed by the Contractor, the Engineer may allow the Contractor to perform the cleaning operations one day per week (at the end of the work week). However, if complaints are received from the City, State, or residents, the Engineer will require that daily cleanup be implemented. 3.30 ACCEPTANCE TESTING A. Acceptance testing shall be required for all work performed under this Contract. The costs for all acceptance testing shall be included in the unit prices bid for the various work items – no separate payment will be made. B. The Contractor shall televise all completed point repair work and new sewer installations to confirm that the installed work meets these Contract Documents. The television inspections shall comply with Section 02650 Sewer Cleaning and Television Inspection. The Contractor will not be paid for the point repair or new sewer until the television inspections are completed and submitted to and approved by the Engineer. The Contractor shall promptly repair any defects identified from the television inspections and re -televise the completed work. Future Pay Estimates may be withheld by the Owner until such defects are repaired. The new pipes (from point repairs and new sewer installations) shall be on a constant grade and alignment from end to end and connections to the existing pipes shall match without offsets, open joints, or leaks. The cost of the television inspections for acceptance shall be included in the cost bid – no separate payment will be made. 115 C. The Contractor shall air test all new sewers installed from manhole to manhole (that have no service lateral connections) in accordance with the standard specifications, ASTM F1417-11a for PVC sewers, and ASTM C969 for ductile iron sewers. Payment will not be made until the air testing is completed and approved. D. The Contractor shall perform mandrel testing on all new PVC sewers installed from manhole to manhole in accordance with the standard specifications. Payment will not be made until the mandrel testing is completed and approved. E. The Contractor shall vacuum test all new manholes and rehabilitated manholes (those coated with cementitious mortar) in accordance with the standard specifications and ASTM C1244, except the minimum test time shall be 1 minute. Payment will not be made until the vacuum testing is completed and approved. F. Also refer to Section 02766 and 02767 – Cured-In-Place Pipe Lining (CIPP) for further testing requirements. 3.31 FINAL INSPECTION A. As work is completed, the Engineer will perform an inspection of the work, including review of post -rehab video inspections, and generate a punchlist of defects, deficiencies and issues for the Contractor to address. Any deficiencies found shall be corrected by the Contractor promptly (within 14 calendar days maximum). Failure to correct deficiencies promptly may result in payment being withheld. The Engineer will not allow punchlist items to build up before repairs are made. B. After all work is completed (including all restoration an d testing), the Engineer will perform a final inspection of all work in all work areas . The Contractor shall notify the Engineer in writing when the work is complete and ready for final inspection. The final inspection will not be performed if any portion of the work is obviously not complete. A punchlist will be developed by the Engineer to identify defects, deficiencies and issues found during the final inspection that must be repaired by the Contractor prior to final payment. After the Contractor addresses the punchlist to the satisfaction of the Engineer, the final pay estimate for the project can be submitted by the Contractor for payment. 3.32 HANDLING AND STORAGE OF MATERIALS A. The Contractor shall be responsible for the safe storage of materials furnished by or to him, and accepted by him and intended for the work, until they have been incorporated in the completed project. The interior of all pipes, manholes and other accessories shall be kept free from dirt and foreign materials at all times. 116 B. The C ontractor and his Suppliers are directed to contact the State Department of Transportation to verify axle load limits on State maintained roads (and bridges) which would be used for hauling of equipment and materials for this project. The Contractor and his Suppliers shall do all that is necessary to satisfy the Department of Transportation requirements and will be responsible for any damage to said roads which may be attributed to this project. C. All materials required to construct this project shall be furnished by the Contractor and shall be delivered and distributed at the site by the Contractor or his material supplier. D. Ductile iron pipe and cast iron accessories shall be lo aded and unloaded by lifting with hoists or skidding so as to avoid shock or damage. PVC pipe and precast manholes will be unloaded with hoists and/or as recommended by the respective manufacturers. Under no circumstances shall such materials be dropped. Pipe handled on skidways shall not be skidded or rolled against pipe already on the ground. E. In distributing the material at the site of the work, each piece shall be unloaded opposite or near the place where it is to be laid in the trench. Each piece shall be redundantly chocked at each end to prevent movement or rolling. Pedestrian or vehicular traffic shall not be unduly inconvenienced in placing of material along the streets or right-of-way, as applicable. F. The Contractor will string in advance no more than the amount of pipe and material that can be installed within two (2) weeks unless approved by the Engineer. All the materials shall be placed in such a manner as not to hinder access, endanger or impede traffic, create a public nuisance or en danger the public. Materials strung through residential areas (or any area with maintained lawns) shall be placed in such a manner as not to restrict normal lawn maintenance, and must either be installed within two (2) weeks or removed to an approved storage yard, as required by the Engineer. G. Storage sites shall be fenced with adequate protection to reasonably prevent people from entering the site. The Contractor shall be responsible for the safeguarding of materials and equipment against fire, theft, and vandalism and in a manner which does not place the public at risk, and shall not hold the City responsible in any way for the occurrence of same. H. Precast manholes, pipe and fittings, including rings and covers, steps, straps, etc., shall be so handled that the coating or lining will not be damaged. If, however, any part of the coating or lining is damaged, the repair shall be made by the Contractor at his expense in a manner satisfactory to the Engineer. 117 3.33 RE CORD DRAWINGS A. The Contractor shall document all work performed and sewers and manholes installed by marking the drawings in red ink to reflect the final, installed work. All changes in sewer and manhole locations, layouts and elevations shall be documented along with the locations for new service laterals. B. Record Drawings shall be submitted at the end of the project and are a requirement prior to final payment. 3.34 PAY ESTIMATES A. Pay estimate forms will be provided to the Contractor. The Contractor will provide the following documents with each payment request: 1. Signed Estimate Form. 2. Schedule of values showing work completed. 3. Survey of new sewers installed. 4. Acceptance testing as specified. B. Contract Closeout Documents: The Contractor will provide the fol lowing documents with the final payment request: 1. Consent of Surety to Final Payment. 2. Contractor's affidavit - Release and Waiver of Claim. 3. Signed estimate form. 4. Record Drawings. C. Final payment will not be authorized until these documents have been properly completed and submitted by the Contractor, and all deficiencies noted at the final inspection have been corrected and approved. D. No payment will be made for stored materials. 3.35 INCLEMENT WEATHER Work shall not be performed when weather creates work site conditions that are unsafe for workmen or for the general public, or prevent performance of the contract provisions. Inclement weather conditions shall be defined as weather extremes (daily rainfall exceeding 0.25”) which exceed the anticipated inclement weather days indicated below: Month Anticipated Inclement Weather Days January 7 February 6 118 March 7 April 5 May 6 June 5 July 6 August 7 September 4 October 4 November 6 December 6 Partial months at the beginning and end of the contract period will be prorated proportionally. Inclement weather occurring on holidays, Saturdays or Sundays are included in the anticipated inclement weather days above. The Contractor shall take into consideration these monthly anticipated inclement weather days when submitting his bid, and therefore these calendar days are included in the Contract time. The Contractor and Owner’s/Engineer’s representative will agree on any days in which the rainfall exceeded 0.25” at the project site. The Contractor may consider installing a rain gauge to measure and document the rainfall. The Contractor shall submit a report to the Engineer monthly, indicating daily rainfall amounts and the dates when rainfall at the site exceeded 0.25”. The Engineer will compare the actual inclement weather days to the anticipated inclement weather days on a monthly basis. At the end of each calendar quarter, the Engineer will submit a report to the Contractor, indicating any adjustment in the Contract period for inclement weather days. Adjustments to the Contract period will be based on a comparison for the entire calendar quarter. The Engineer will consider special conditions caused by inclement weather or by continuing adverse weather patterns on a case-by-case basis. Such requests must be submitted in writing to the Engineer within seven (7) calendar days of the occurrence(s) and must be fully documented with the cause and the effect of the occurrence(s) on critical path activities. Within 30 calendar days of receipt of a request from the Contractor, the Engineer will submit a report to the Contractor, indicating any adjustment in the Contract period. The Contractor’s sole remedy for delays covered by this provision shall be an extension of the contract time only. 3.36 ADJACENT STRUCTURES AND LANDSCAPING The Contractor shall be entirely responsible and liable for all damage or injury as a result of his operations to all public and private property, structures of any kind, and appurtenances thereto during the progress of the work. The cost of 119 prote ction, replacement in the original location and condition, and payment of damages for injuries shall be included in the various bid items, and no separate payments will be made. The Contractor is advised that the protection of buildings, structures, tunnels, tanks, pipelines, etc. and related work adjacent to and in the vicinity of his operations, is solely his responsibility. Conditional inspection of buildings or structures in the immediate vicinity of the project which may reasonably be expected to be affected by the work shall be performed by and shall be the responsibility of the Contractor. The Contractor shall, before starting operations, make an examination of the interior and exterior of the adjacent structures, buildings, facilities, etc., and record by notes, measurements, photographs, etc., conditions which might be aggravated by his operations. Repairs to or replacement of all damage reasonably attributed to or caused by the construction shall be made to the satisfaction of the affected property owner, the Owner and the Engineer. This does not preclude conforming to the requirements of the insurance underwriters. Copies of surveys, photographs, reports, etc., shall be given to the Engineer. Prior to the beginning of any excavations or other work, the Contractor shall advise the Engineer of all buildings or structures the project work will affect and any pre-existing conditions that need to be brought to the attention of the Engineer. Lawn areas shall be left in as good or better condition as before the starting of the work. Where sod is to be removed, it shall be carefully removed, maintained, and later replaced, or the area where sod has been removed shall be restored with new sod in the manner described in these Specifications. All restoration shall be as specified in these Specifications. The final grade shall match the pre-existing grade as closely as possible unless noted otherwise. Any fence, or part thereof, that is damaged or removed during the course of the work shall be replaced or repaired by the Contractor and shall be left in as good or better condition as before the starting of the work. The manner in which the fence is repaired or replaced and the materials used in such work shall be subject to the approval of the property owner and the Engineer. The cost of all labor, materials, equipment, and work for the replacement or repair of any fence shall be deemed included in the appropriate bid item. 3.37 NOISE CONTROL The Contractor shall minimize noise at all times and shall make reasonable efforts to avoid unnecessary noise. Such measures shall be appropriate for the normal ambient sound levels in the area during working hours. All construction machinery 120 and vehi cles shall be equipped with practical sound-muffling devices, and operated in a manner to cause the least noise consistent with efficient performance of the Work. During construction activities on or adjacent to occupied buildings, and when appropriate, the Contractor shall erect screens or barriers effective in reducing noise in the building and shall conduct his operations to avoid unnecessary noise which might interfere with the activities of building occupants. The Contractor shall strictly observe all local regulations and ordinances covering noise control. Except in the event of an emergency or where approved or specified by the Engineer, no work which produces noise shall be done between the hours of 7:00 P.M. and 7:00 A.M., or on Sundays. Dewatering equipment and bypass pumping equipment operating during these times shall be quiet or silent pumps or electric motor driven pumps. If the proper and efficient prosecution of specific and limited work requires operations during the night, the written permission of the Engineer shall be obtained before starting such items of the work. 3.38 DUST CONTROL The Contractor shall take sufficient precautions throughout construction to minimize the amount of dust created. The Contractor shall prevent dust nuisance from his operations or from traffic by keeping roads and/or construction areas clean and sprinkled with water. Construction entrances shall be provided as specified in the standard details. Buildings or operating facilities which may be affected adversely by dust shall be adequately protected from dust. Existing or new machinery, motors, instrument panels, or similar equipment shall be protected by suitable dust screens. Proper ventilation shall be included with dust screens. 3.39 SMOKE PREVENTION The Contractor shall not use equipment which routinely produces substantial visible emissions. Strict compliance with ordinances regulating the production and emission of smoke will be required. No open fires will be permitted unless approved by the local authorities and the Engineer. 3.40 STAGING AREAS The Contractor shall be responsible for locating, negotiating and paying for staging areas and equipment and material storage areas. 3.41 PARKING 121 The C ontractor shall provide and maintain suitable parking areas for the use of all construction workers and others performing work or furnishing services in connection with the project and as required to avoid any need for parking personal vehicles where they may interfere with public traffic, the Owner’s operations, or construction activities. 3.42 CONTRACT MODIFICATION All changes which affect the cost of the construction of the project must be authorized by means of a Contract Change Order. All Change Orders and Contract modifications must be approved by the Owner prior to becoming effective. The Contract Change Order will include extra work, work for which quantities have been altered from those shown in the Bid Schedule as well as decrease or increase in the quantity of the installed units which are different from those shown in the Bid Schedule because of final measurements. All changes should be recorded on a Contract Change Order as they occur so that they may be included in the partial payment estimate. 3.43 PROTECTION OF WORK The Contractor shall at all times, until final acceptance of the work, provide protection of the work, either new or previously existing, from all hazards involved in his operations. 3.44 SECURITY The Contractor shall be responsible for protection of the site, and all Work, materials, equipment, and existing facilities thereon, against vandals and other unauthorized persons. No claim shall be made against the Owner by reason of any act of any employee or trespasser, and the Contractor shall make good all damage to the Owner’s property resulting from his failure to provide security measures as specified. The Contractor shall provide insurance to cover the cost of all labor, materials and equipment to be supplied under this Contract until the work is completed, acceptance testing has been performed, and the Owner has accepted the project and it is ready to be placed in service. 3.45 PUBLICITY All prime contractors and their subcontractors shall submit to the Owner for approval all publicity items, including photographs, relating to the work of this project. The Owner shall approve any and all material prior to release for publication. 3.46 SPECIAL PRECAUTIONS 122 At a ll times during the construction of the project and its component parts, the Contractor shall provide, install and maintain proper temporary supports, shoring and bracing to prevent any damage to the work due to all causes. 3.47 WARRANTY PERIOD The Contractor shall warrant all work and materials installed in this Contract for one (1) year from the date of final acceptance. The date of final acceptance shall be the date that final payment is made to the Contractor. Prior to final acceptance, the Cont ractor shall submit a written plan on how warranty issues will be addressed, including CIPP issues, manhole issues, and restoration issues. 3.48 DRAWINGS AND SPECIFICATIONS The Drawings and Specifications form a part of this Contract as set forth in Paragraph 1.1, Document 00700, GENERAL CONDITIONS. The Drawings and Specifications are as listed in the Contract Agreement. END OF SECTION 123 SECTION 01140 PROJECT ACCESS AND RESTRICTIONS PART 1 GENERAL 1.1 RIGHT OF ENTRY A. The Owner and their representatives shall have access to the work at all times. Representatives of Federal, State and Local Agencies affected by the work shall be allowed access to the project site for inspection. Contractor shall provide the proper facilities for access and inspection of all phases of the work. 1.2 RIGHTS-OF-WAY AND EASEMENTS A. The project will be constructed within existing public rights -of-way and easements obtained by the Owner across private properties. The limits of the easements and rights-of-way are shown on the drawings. Copies of the easements may be obtained from the Owner. B. Contractor shall set stakes to mark the easement boundaries across private property. These stakes shall remain until completion of construction. C. Contractor shall not encroach upon any private property outside the easement limits without written permission from the property owner. D. For work performed within state and county road rights -of-way, encroachment agreements have been obtained, and copies may be obtained from the Owner. 1.3 WORK HOURS A. With the exception of emergency repairs, all construction work shall be performed during the hours of 7:00 A.M. to 6:00 P.M., Monday through Friday. However, no heavy equipment may be operated prior to 8:00 A.M. or after 5:00 P.M. After hours, holiday or weekend work, except for emergencies, shall not be performed without prior permission from the Owner. PART 2 PRODUCTS Not Used PART 3 EXECUTION Not Used END OF SECTION 124 SECTION 01200 PROJECT MEETINGS PART 1 GENERAL 1.1 PRECONSTRUCTION CONFERENCE A preconstruction conference will be scheduled by the ENGINEER within 14 days after issuance of the Notice to Proceed. The Contractor and his major subcontractors shall attend the meeting, which will be chaired by the ENGINEER or his representative. The purpose of the pre -construction conference will be to discuss administration of the Contract and the execution of work, and to answer any questions relative to performance of the work, under these Contract Documents. All decisions, instructions and interpretations made at this conference shall be binding and conclusive. The proceedings of this conference will be recorded and copies of the proceeding minutes will be issued to the Contractor for his use and distribution to his subcontractors. 1.2 MONTHLY PROGRESS MEETINGS The Contractor and any subcontractor, material suppliers or vendors whose presence is necessary or requested shall attend meetings, referred to as Monthly Progress Meetings, when requested by the ENGINEER or his representative for the purpose of discussing the execution of work. Each meeting will be held at the time designated by the ENGINEER or his representative. Each meeting shall be held at the administrative office of the Owner, located at 120 Augusta Arbor Way, Greenville, South Carolina. All decisions, instructions and interpretations given by the ENGINEER or his representative at these meetings shall be binding and conclusive on the Contractor and such decisions, instructions and interpretations shall be confirmed in writing by the ENGINEER or his re presentative. The proceedings of these meetings will be recorded and the Contractor will be furnished with a reasonable number of copies for his use and for his distribution to the subcontractors, material suppliers and vendors involved. END OF SECTION 125 SECTION 01270 MEASUREMENT AND PAYMENT Bid items have been set up in the Bid Form for all work that is permanent and measurable. The bid for each pay item shall include the cost of all new material, labor, equipment, and all else required to complete that pay item as specified. Payment for work will only be made after the work is complete and has been inspected by the Engineer. The Bid includes the following abbreviations: - LF = linear foot - VF = vertical foot - EA = each - CY = cubic yard - SY = square yard - ACRE = acre The Total Bid Price shall cover all work required by the Contract Documents. All costs in connection with the proper and successful completion of the work, including furnishing all materials, equipment, supplies, and appurtenances; providing all construction plans, equipment, and tools; and performing all necessary labor and supervision to fully complete the work, shall be included in the unit and lump sum prices bid. All work not specifically set forth as a pay item in the Bid Form shall be considered subsidiary obligations of Contractor and all costs in connection therewith shall be included in the prices bid. All estimated quantities stipulated in the Bid Schedule or other Contract Documents are approximate and are to be used only (a) as a basis for estimating the probable cost of the Work, and (b) for the purpose of comparing the bids submitted for the Work. The actual amounts of work done and materials furnished under unit price items may differ from the estimated quantities. The basis of payment for work and materials will be the actual amount of work done and materials furnished. Contractor agrees that he will make no claim for damages, anticipated profits, or otherwise on account of any difference between the amounts of work actually performed and materials actually furnished and the estimated amounts therefore. Item 1 - Sewer Cleaning and Television Inspection: This item includes all work and equipment required to completely clean (remove debris, roots, grease, pipe tuberculation and other material) and televise existing 8” to 12” sewers to further evaluate the condition of the sewers as specified. The cleaning and CCTV inspections will be used to identify defects in need of repair and as pre - CIPP installation work. Costs shall include any and all debris encountered in the work regardless of severity and disposing of all debris. Costs shall also include submittals of the digital inspections in PACP format to the Engineer as specified. Further, costs shall include any and all costs associated with accessing the sewers and manholes to perform the work as specified including building access roads, negotiating with property owners, traffic control, complete restoration of areas disturbed by the work, etc. This item includes working in any location (unpaved areas or 126 paved areas), except easements as defined further below. A bid item is included as an add-on price for cleaning and televising sewers in easements; easements shall be as defined further below. The base bid items (Item 1A, 1B and 1C) are for cleaning and televising sewers in non-easement areas. Non-easement areas are defined as roads, other paved areas, graveled areas, and landscaped areas not defined as easements herein. An add-on bid item (Item 1D) is provided for cleaning and televising sewers in easement areas (any sewer diameter). Easement areas are defined as wherever the set-up manhole is located 50 feet or more from the nearest paved or graveled surface. Payment will be made for the entire length of sewer cleaned and televised where the set-up manhole meets this criterion. If sewer cleaning and television inspection occurs in an easement area as defined herein, payment will be made for the entire length from manhole to manhole under the base bid item for non-easement areas plus the entire length from manhole to manhole under the add-on bid item. The add -on bid item shall cover any diameter sewer being cleaned and televis ed. T he Engineer’s decision on what constitutes an easement area shall be final. Sewer cleaning and television inspection will be measured and paid for on a linear foot basis to the nearest one-tenth of a foot. Measurement will be along the horizontal centerline of the pipe with no deductions for manholes and will be from center of manhole to center of manhole. Bid Item 1E is included for verifying if service laterals are active. A camera shall be deployed in the sewer segment where the service lateral is located. Dye with sufficient color and concentration to readily see if present shall be poured in the clean -out and the camera maneuvered within the sewer segment to find the location where the dye is entering. If a clean- out is not present, the Contractor shall coordinate with homeowners or business owners to have the homeowners or business owners pour dye into a toilet and flush (or multiple plumbing fixtures if it appears that the property may have two laterals). The Contractor shall make every reasonable effort to coordinate with the homeowners or business owners prior to mobilizing the CCTV truck and document the effort. Payment will be made for each clean -out or home/business where dye is introduced. Video of dye entering the sewer with accurate footage of the location of the service lateral or video proving that the entire sewer segment was televised and no dye was present shall be submitted to the Engineer. Payment will be made on the basis of the unit prices bid in the Bid. This item does not include televising sewers for final acceptance. Those costs shall be included in the various unit prices for that work – no separate payment will be made. Items 2A through 2D - Point Repairs to Existing Sewers : This item includes all materials, equipment, and work required to perform point repairs to existing main sewers. Bid Items 2A, 2B and 2C are included for performing point repairs to existing 8”, 10” and 12” main sewers at various depths. Bid Items are included for a lump sum payment for performing point repairs a minimum of 8 feet long up to 12 feet in length and payment per linear foot for each foot over 12 feet. The Contractor shall not exceed 12 feet in length unless specified by the Engineer and/or as agreed to by the Engineer in the field prior to the work being completed. The Contractor shall not be paid for any length over 12 feet under any circumstances unless specified and/or approved by the Engineer prior to the work. If specified and/or approved by the Engineer, 127 when a point repair exceeds 12 feet in length, the Contractor shall be paid for the first 12 feet of the point repair under the lump sum Bid Item and then on a linear foot basis for each foot over 12 feet. The work shall be performed as specified and in accordance with Detail SS-22. The base bid includes using PVC pipe for the repair. If ductile iron pipe is required, the add-on price for this pipe material will be paid under Bid Item 2D. The base bid items include backfilling with the excavated soil. If the excavated soil is not suitable for backfilling or ABC stone or flowable fill are required for backfilling the trench, payment for removing and disposing of the excavated material offsite and importing the specified material will be paid under Bid Items 17D, 17E and 17F. The base bid items include all required restoration of grassed areas disturbed by the work. Restoration of asphalt pavement, concrete, curbs and gutters, sod and graveled areas shall be paid separately under Bid Item 17. These items further include payment for saw -cutting existing asphalt or concrete up to 6 inches thick (additional thickness paid under Item 17) and disposing of material, excavation, removal and off-site disposal of existing soil and sewer pipe, installation of new sewer, connections to existing manholes and sewers, bedding, backfilling, compaction, bypass sewage pumping during construction, accessing sewers and manholes as specified, traffic control, compliance with required working hours, coordination with and location of existing utilities, erosion control, and all else incidental thereto for which separate payment is not provided under other Bid Items. This item also includes television inspection of all point repairs to confirm proper installation. Payment will be made for each point repair at the installed depth. Payment will be made on the basis of the unit price bid. Payment will not be made for any length outside of the required point repair length as defined by the Engineer unless approved by the Engineer prior to performing the point repair. In addition, no payment will be made for additional repairs located outside of the defined length that are required as a result of the Contractor’s work on the defined point repair. Items 2E through 2I – Service Lateral and Cleanout Installation : Th ese items include replacing existing service connections and service laterals as part of point repair work and when lateral replacement and cleanout installations are specified. Bid Item 2 E is included for installing tee- wye connections (ductile iron and PVC) within point repair segments to reconnect service laterals to the main sewer for various pipe diameters at any depth and installing 6 feet of PVC or DIP lateral. Typically, the new tee-wye will be ductile iron whenever CIPP will be installed after the repair is made and will be PVC when the existing main sewer pipe material is PVC. Refer to Detail SS-16. Bid Item 2F is for installing a new service lateral from the end of the tee- wye connection and 6 feet of pipe installed under Bid Item 2E to the property line or point of termination specified by the Engineer. Bid Items are included for new 6” PVC and ductile iron service laterals at various 128 depths (actual depth of the new service lateral). Payment for this item will begin at the end of the 6 feet of pipe installed as part of the tee -wye connection or for any new lateral pipe installed that is not part of a tee-wye connection. Tracer wire shall be installed along all new laterals installed as part of main sewer replacements from manhole to manhole at no additional cost. Measurement will be for actual footage of new lateral pipe installed. Measurement of linear footage will be along the centerline of the service lateral from the end of the 6 feet of lateral included in the tee- wye connection to the end of the installed lateral (typically to the property line or edge of the sewer or road right-of-way). Bid Item 2G is included for installing cleanouts on new 6” PVC and ductile iron service laterals installed under Item 2F (any depth of cleanout). In some cases, a cleanout may be specified for installation without replacing the lateral or installing a new lateral. These stand -alone cleanouts will be paid under Bid Item 2H . The cleanout shall be in accordance with Detail SS-6.5. The cleanout shall be considered to begin at the wye fitting on the service lateral pipe. This item includes cleanouts on any size lateral at any depth. Bid Item 2 I is included for connecting new lateral pipes to existing precast concrete manholes, including core drilling the manhole wall and installing a new flexible manhole sleeve connect or per Detail SS-7.1. If the existing manhole is brick or block, the connection shall be made by sealing the opening around the pipe with non- shrink grout and pouring a conc rete collar on the outside of the wall per Detail SS-20. Lateral pipes connecting to new manholes will be paid under Item 2F. These items further include payment for saw -cutting existing asphalt or concrete up to 6 inches thick (additional thickness paid under Item 17) and disposing of material, excavation, removal and off-site disposal of existing soil and sewer pipe, installation of new sewer, connections to existing sewers, bedding, backfilling, compaction, bypass sewage pumping during construction, accessing sewers and manholes as specified, traffic control, compliance with required working hours, coordination with and location of existing utilities, erosion control, and all else incidental thereto for wh ich separate payment is not provided under other Bid Items. This item also includes television inspection of all new service laterals to confirm proper installation. Item 2J – Storm Sewer Replacement: Bid Item 2J is included for replacing existing storm sewer as necessary with new RCP storm sewer that may be encountered/damaged during point repairs. Payment will not be made for any storm sewer replacement unless approved by the Engineer prior to performing the repair. Item 3 - Replacing Existing Sewers with New Sewers from Manhole to Manhole: This item includes all materials, equipment, and work required to replace existing sewers from manhole to manhole as specified and in accordance with the standard specifications and details. The Bid includes Bid Items for 8” PVC sewers at varying depths with an add-on cost for installing ductile iron pipe when specified. The Engineer will define the existing and new sewer sizes. The depth will be determined in the field. 129 When ductile iron pipe is specified, the Contractor shall be paid for the length installed under the PVC bid item (Bid Item 3A) at the corresponding depth plus the length installed under the add-on ductile iron bid item (Bid Item 3B). Bid I tem 3C is also included for installing PVC and ductile iron tee -wyes within the sewer replacement section to reconnect service laterals to the new sewer, including installing 6 feet of 6” PVC or ductile iron lateral pipe as noted in the Bid Form. Additional lateral pipe length will be paid under Bid Item 2F. This item includes payment for sawcutting existing asphalt or concrete up to 6 inches thick (additional thickness paid under Item 17) and disposing of material, excavation, removal and off- site disposal of existing sewer pipe and manhole m aterials, surveying services to install the new sewers, installation of new sewer, watertight connections to existing manholes and new manholes, bedding, backfilling with excavated soil and compaction, product testing and low pressure air testing, mandrel testing, bypass sewage pumping during construction where required, accessing sewers and manholes as specified, traffic control, compliance with required working hours, coordination with and location of existing utilities, and for all else incidental thereto for which separate payment is not provided under other bid items. In addition, this item shall include installing tracer wire along all main sewers from manhole to manhole and terminating the tracer wire in the manholes as directed by the Engineer at no additional. This item shall also include complete restoration of grassed areas disturbed by the work. Other restoration shall be paid under Bid Item 1 7. Further, this item includes cleaning and televising the new sewers after the new sewer and connecting laterals are installed and prior to requesting payment. Pipe replacement will be measured in place on a linear foot basis to the nearest foot along the horizontal centerline of the pipe with no deductions for manholes and will be from center of manhole to center of manhole, at the corresponding depth. The base bid items for the new sewers include backfilling with the excavated soil. If the excavated soil is not suitable for backfilling or ABC stone or flowable fill are required for backfilling the trench, payment for removing and disposing of the excavated material offsite and importing the specified material will be paid under Bid Items 17D, 17E and 17F. Payment will be made on the basis of the unit prices bid. Item 4A – Installation of New External DIP Drop Connections at Existing or New Manholes: This item includes all materials, equipment, and work required to install new external drop connections at existing or new manholes in accordance with the specifications and details . Bid Items are included for new 8” ductile iron drop connections at vertical lengths up to 5 feet (lump sum payment) and for vertical lengths over 5 feet (cost to be added to the lump sum cost). When an external drop pipe exceeds 5 feet in vertical length, the Contrac tor shall be paid for the first 5 feet of the drop under the lump sum Bid Item and then on a vertical foot basis for each foot over 5 feet. This item includes payment for installing a full joint of new ductile iron sewer to connect the new drop to the existing sewer and for connecting to the existing sewer with a rubber coupling with shear rings. Any footage beyond the full joint of pipe required to properly connect the new drop to the existing sewer (as agreed by the Engineer) will be

Text truncated. Open the original for the full document.

Source: City of Mauldin website. First collected Nov 7, 2026.