RecordWell Data

City Council Agenda

City of Charleston · Berkeley County · meeting of Mar 24, 2026 · Agendas

Open the original document More from City of Charleston

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

1 March 24, 2026 5:00 p.m. City Hall 80 Broad Street https://www.youtube.com/@Cityof CharlestonSCgov/streams CITY COUNCIL A. Roll Call B. Invocation – Councilmember Appel C. Pledge of Allegiance D. Presentations and Recognitions 1. Proclamation recognizing Greek Independence Day E. Public Hearings Any person who speaks at a City Council meeting shall conduct himself or herself in a manner appropriate to the decorum of the meeting and is asked to observe Section 2-28 (a) of the Code of the City of Charleston, Rules of Decorum. Violation of the Rules of Decorum may result in losing the opportunity to speak before Council and/or removal from the meeting. Citizens may sign-up to speak in person at the Council meeting until 5:00 p.m. at the meeting location. If participating virtually, citizens may use one of the following methods to request to speak at the meeting or provide comments for City Council. Requests to speak at the meeting and comments must be received by 12:00 p.m., Monday, March 23rd. 1. Request to speak (via Zoom or telephone) or leave a comment via voice mail at 843-579- 6313. If requesting to speak, please provide your name and telephone number; 2. Request to speak (via Zoom or telephone) or leave a comment for City Council by completing the form at http://innovate.charleston-sc.gov/comments/. 3. Mail comments to: Clerk of Council, 80 Broad Street, Charleston, SC 29401 (City Council may give second reading, order to third reading, give third reading, and order engrossed for ratification any bill listed on the agenda as a second reading.) 2 1. An ordinance amending the Stormwater Design Standards Manual as set forth in Exhibit A, attached hereto to provide updates reflecting advances in technology and experience related to stormwater management. 2. An ordinance to amend Article 2-Land Use Regulations; Part 11-Design Review District; Section 54-268-Designation of Design Review District, Review Authority, Scope of Authority and Exemptions related to Capital Projects. (AS AMENDED) (SECOND READING) (The Planning Commission recommended disapproval.) 3. An ordinance to amend Chapter 54 of the Code of the City of Charleston (Zoning Ordinance) Article 2 - Land Use Regulations and Article 3 - Site Regulations to establish a new Mixed- Use Workforce Housing District (MU-3/WH). 4. An ordinance to amend the Zoning Ordinance of the City of Charleston by changing the Zone Map, which is a part thereof, so that 993 & 995 Morrison Dr (Peninsula) (approx. 6.43) (TMS #4611303101 & 46113030241) (Council District 4), be rezoned to remove the Tech Overlay District from the property’s classification. The property is owned by Charleston County. (SECOND READING) 5. An ordinance to amend the Zoning Ordinance of the City of Charleston by changing the Zone Map, which is a part thereof, so that two parcels off Adele Street (West Ashley) (approx. 0.26 ac.) (TMS #3510700056 and 3510700055) (Council District 7), be zoned Residential Office (RO) classification. The property is owned by Bubsy LLC. 6. An ordinance to amend the Zoning Ordinance of the City of Charleston by changing the Zone Map, which is a part thereof, so that 1444 Joy Avenue (West Ashley) (approx. 0.23 ac.) (TMS #3521300190) (Council District 9), be zoned Single & Two Family Residential (STR) classification. The property is owned by Nathan Hertel. 7. An ordinance to amend the Zoning Ordinance of the City of Charleston by changing the Zone Map, which is a part thereof, so that 1310 and 1312 S Edgewater Drive (West Ashley) (approx. 0.60 ac.) (TMS #3491300028) (Council District 11), be zoned Single Family Residential (SR-1) classification. The property is owned by Brandy and David Arnold. 8. An ordinance to amend the Zoning Ordinance of the City of Charleston by changing the Zone Map, which is a part thereof, so that 1309 N Edgewater, be zoned Single Family Residential (SR-1) classification. The property is owned by Nasser and Mary Lisa Razmyar. 9. An ordinance to amend the Zoning Ordinance of the City of Charleston by changing the Zone Map, which is a part thereof, so that 1450 S Edgewater Drive (West Ashley) (approx. 0.62 ac.) (TMS #3491300047) (Council District 11), be zoned Single Family Residential (SR-1) classification. The property is owned by Nancy C Meyer F. Act on Public Hearing Matters G. Approval of City Council Minutes: 1. March 10, 2026 H. Citizens Participation Period 3 PLEASE NOTE THAT THE CITIZENS’ PARTICIPATION PERIOD IS 30 MINUTES AND WILL BE LIMITED TO THE FIRST 30 SPEAKERS. SPEAKERS RESIDING IN OR MAINTAINING A BUSINESS LICENSE WITH THE CITY OF CHARLESTON AND SPEAKING ON ITEMS ON THE MEETING’S AGENDA SHALL SPEAK FIRST. Any person who speaks at a City Council meeting shall conduct himself or herself in a manner appropriate to the decorum of the meeting and is asked to observe Section 2-28 (a) of the Code of the City of Charleston, Rules of Decorum. Violation of the Rules of Decorum may result in losing the opportunity to speak before Council and/or removal from the meeting. Citizens may sign-up to speak in person at the Council meeting until 5:00 p.m. at the meeting location. If participating virtually, citizens may use one of the following methods to request to speak at the meeting or provide comments for City Council. Requests to speak at the meeting and comments must be received by 12:00 p.m., Monday, March 23rd. 1. Request to speak or leave a comment via voice mail at 843-579-6313. If requesting to speak, please provide your name and telephone number; 2. Sign-up to speak or leave comments for City Council by completing the form at http://innovate.charleston-sc.gov/comments/ by Monday, March 23rd at 12:00 p.m. 3. Mail comments to: Clerk of Council, 80 Broad Street, Charleston, SC 29401 I. Petitions and Communications: 1. 993/995 Morrison Drive (Potential action may be taken to include consideration of term sheet and authorization for Mayor to execute an agreement, in a final form incorporating the term sheet, to be approved by legal and finance, on behalf of the City of Charleston with Charleston County to include and list its property at 993/995 Morrison Drive as part of Project 3500) (Considered by the Community Development Committee on March 19, 2026. This item is being fast-tracked due to time constraints.) 2. Approval of the respective First Amendments to Agreements for Purchase and Sale of Real Property with the International Longshoreman’s Association and the Trustees of Waterfront Employers – ILA in relation to the City’s purchase of properties collectively known as “899 Morrison” from the ILA and Trustees. (Considered by the Community Development Committee on March 19, 2026. This item is being fast-tracked due to time constraints.) J. Council Communications: K. Consent Agenda Items: L. Council Committee Reports: 1. Committee on Ways and Means: 4 (Bids and Purchases (Community Services – Office of Cultural Affairs: Approval to apply for $5,000.00 from the SC Department of Parks, Recreation and Tourism Advertisement Grant for the 2026 MOJA Arts Festival. Due to time constraints, this grant was submitted on March 6th, 2026. A 3:1 City match is required for this grant. Matching funds will come from MOJA admissions, contributions, and the 2026 ATAX allocation. (Facilities and Capital Projects – Parks: Approval of Fort Pemberton Public Access Improvements Fee Amendment #3 with Seamon, Whiteside & Associates, Inc. in the amount of $11,000.00 for extensions to weekly NPDES permitting services and construction administration work as part of the Fort Pemberton Park project. This fee amendment increases the Design and Permitting contract by $11,000.00 from $105,900.00 to $116,900. Funding sources for this project are: General Fund Reserves ($1,109,838.90), Land & Water Conservation Fund Grant ($261,000.00), Charleston County Greenbelt Funds ($261,000.00), Settlement Revenue ($169,980.84), and American Rescue Plan Act funds ($92,289.65). (Facilities and Capital Projects – Parks: Approval of Prioleau Street Sidewalk and Plaza Improvements Construction Contract in the amount of $442,490.00 with Three Oaks Contractors. The scope of this contract is for the replacement of the existing sidewalk on the east side of Prioleau St. from Vendue Range to Middle Atlantic Wharf. With approval of the project budget, staff is authorized to award and/or amend contracts less than $100,000.00 to the extent contingency funds exist in the Council Approved Budget. Approval of this contract obligates $442,490.00 of the $700,000.00 project budget. The funding source for this project is the Hospitality Fund ($700,000.00). (Planning, Permitting, & Engineering – Stormwater Management: Approval of Windermere Drainage Improvements Construction Contract within the amount of $10,250,000.00 Lowcountry Sitework, LLC. The scope of this contract includes the installations of concrete pipe, box culvert, and drainage structures/valves; paving and pavement milling; utility relocations; and more in order to add one drainage outfall in the Windermere Basin and improve an existing outfall. With approval of the project budget, staff is authorized to award and/or amend contracts less than $100,000.00 to the extent contingency funds exist in the Council Approved Budget. Positive action on this item is required for consideration of the subsequent two Windermere Drainage Improvements items. Approval of this construction contract obligates $10,250,000.00 of the $12,620,473.91 project budget. Additional funding sources for the project are: Drainage Fund ($5,743,680.24), State Appropriations ($4,500,00.00), and CWS contributions ($2,376,793.67). (This item was considered by the Committee on Public Works and Utilities on March 23, 2026, and is being brought forward to Ways and Means due to time constraints). (Planning, Permitting, & Engineering – Stormwater Management: Approval of Windermere Drainage Improvements Fee Amendment #2 in the amount of $426,000.00 with Thomas & Hutton for construction-phase engineering services. The scope of services includes construction administration, field observations, materials testing, and construction monitoring. Positive action is required on the Windermere Drainage Improvements Construction Contract for this item to proceed. Approval of Fee Amendment #2 increases the design contract by $426,000.00 (from $686,900.00 to $1,112,900.00). Funding sources for this project are: Drainage Fund ($5,743,680.24), State Appropriations ($4,500,00.00), and CWS contributions ($2,376,793.67). (This item was considered by the Committee on Public Works and Utilities on March 23, 2026, and is being brought forward to Ways and Means due to time constraints). (Planning, Permitting, & Engineering – Stormwater Management: Approval of Windermere Drainage Improvements Revised Memorandum of Agreement with Charleston Water System for In-Contract Utility Relocation between the Commissioners of Public Works of 5 the City of Charleston D/B/A Charleston Water System and the City of Charleston, South Carolina. This agreement revises the previously approved utility relocation costs to be borne by the City and CWS in accordance with the Windermere Drainage Improvements construction contract and project budget. Positive action is required on the Windermere Drainage Improvements Construction Contract for this item to proceed. Approval of this MOA increases from $1,203,532.83 to $2,376,793.67 the estimated amount CWS will reimburse the City for utility relocation costs. (This item was considered by the Committee on Public Works and Utilities on March 23, 2026, and is being brought forward to Ways and Means due to time constraints). (Planning, Permitting, & Engineering – Stormwater Management: Approval to execute the National Fish and Wildlife (NFWF) grant agreement in the amount of $1,000,000.00 for Newmarket Creek Restoration Project: site assessment & preliminary design phase. The agreement states that the City will contribute a match of $500,000.00 from the Cooper River Bridge TIF. (This item was considered by the Committee on Public Works and Utilities on March 23, 2026, and is being brought forward to Ways and Means due to time constraints). (Police Department: Approval to submit an application for the SFY27 SCDPS Body-Worn Camera Grant in the amount of $749,555.94. The grant will help reimburse the costs of CPD’s body-worn camera replacement project. There is no match required for this grant. (This item was considered by the Committee on Public Safety on March 17, 2026, and is being brought forward to Ways and Means due to time constraints). (Real Estate: Approval to authorize the Mayor to execute a Management and Operating Agreement with Explore Charleston, CVB, Inc. for the Visitor’s Reception and Transportation Center Garage. (63 Mary Street, TMS# 459-09-03-147). The property is owned by the City of Charleston. [Ordinance]. (This item was considered by the Committee on Real Estate on March 23, 2026, and is being brought forward to Ways and Means due to time constraints). Give first reading to the following bill from Ways and Means: An ordinance authorizing the Mayor to execute on behalf of the City a “Management and Operating Agreement between City of Charleston and Explore Charleston CVB, Inc.” for the management of the Visitor’s Reception and Transportation Garage located at 63 Mary Street (TMS# 459-09-03- 147). M. Bills up for Second Reading: (City Council may give second reading, order to third reading, give third reading, and order engrossed for ratification any bill listed on the agenda as a second reading.) 1. An ordinance to authorize the execution and delivery of lease/purchase agreements with TD Equipment Finance, Inc. in order to provide for the acquisition of various equipment, expected to include vehicles, fire apparatus, public works equipment and IT equipment; to provide the terms and conditions of such lease/purchase agreements; to provide for the granting of a security interest to secure all obligations of lessee under the lease/purchase agreements; to authorize the execution and delivery of all documents necessary or appropriate to the consummation of such lease/purchase agreements; and to provide for other matters related thereto. 6 2. Authorization for Mayor to execute on behalf of the City a temporary easement to Commissioners of Public Works of the City of Charleston for use as a laydown and access easement across the site to facilitate the West Ashley Transmission Main Extension Project. 3. An ordinance authorizing the Mayor to execute a permanent utility easement to construct and maintain utility lines in the West Ashley area of the City of Charleston as part of the Grantee’s West Ashley Transmission Main Extension Project. 4. An ordinance authorizing the mayor to execute the necessary documents to enter into that certain fourth amendment to the sub-lease between the City of Charleston and the South Carolina Aquarium, said amendment being marked as Exhibit A, attached hereto and incorporated by reference herein. 5. An ordinance authorizing the Mayor to execute an option agreement with America Street Ventures, LLC for approximately 0.264 acres identified as 76 Aiken street (0.131 acres – TMS # 459-05-04-048), 119 America Street (0.076 acres – TMS #459-05-04-002) and 121 America Street (0.057 acres - TMS# 459-05-04-001) the development of up to 52 units of affordable /workforce housing. 6. An ordinance authorizing the Mayor to execute a Title to Real Estate to DRP SC 3, LLC for parcels B-3 and B-4, Located in Long Savannah. 7. An ordinance to provide for the annexation of property known as 3280 Maybank Highway (2.29 acre) (TMS# 279-00-00-006), Johns Island, Charleston County, to the City of Charleston, shown within the area annexed upon a map attached hereto and make it part of District 3. The property is owned by Bright Oak Properties LLC. 8. An ordinance to provide for the annexation of property known as 1738 Fern Hill Drive (0.41 acre) (TMS# 313-00-00-237), Johns Island, Charleston County, to the City of Charleston, shown within the area annexed upon a map attached hereto and make it part of District 3. The property is owned by Rosemary Lynn Knox. 9. An ordinance to provide for the annexation of property known as 2158 Golfview Drive (0.22 acre) (TMS# 343-06-00-018), James Island, Charleston County, to the City of Charleston, shown within the area annexed upon a map attached hereto and make it part of District 11. The property is owned by Kevin & Alexandra Sell. 10. An ordinance to provide for the annexation of property known as 107 E Edgewater Drive (0.57 acre) (TMS# 349-13-00-027), West Ashley, Charleston County, to the City of Charleston, shown within the area annexed upon a map attached hereto and make it part of District 11. The property is owned by Matthew and Julia Copeland. 11. An ordinance to provide for the annexation of property known as 205 Shady Lane (0.32 acre) (TMS# 350-14-00-080), West Ashley, Charleston County, to the City of Charleston, shown within the area annexed upon a map attached hereto and make it part of District 5. The property is owned by Joyce & Martin Pyle. 12. An ordinance to provide for the annexation of property known as 879 Trent Street (0.27 acre) (TMS# 309-14-00-159), West Ashley, Charleston County, to the City of Charleston, shown 7 within the area annexed upon a map attached hereto and make it part of District 2. The property is owned by Craig & Kim Browdy. 13. An ordinance to provide for the annexation of property known as 1416 Drexel Drive (0.30 acre) (TMS# 352-09-00-106), West Ashley, Charleston County, to the City of Charleston, shown within the area annexed upon a map attached hereto and make it part of District 9. The property is owned by James and Robert Seay. 14. An ordinance to provide for the annexation of property known as A Portion of Bear Swamp Road (1.73 acre) (TMS# 301-00-00-007), West Ashley, Charleston County, to the City of Charleston, shown within the area annexed upon a map attached hereto and make it part of District 10. The property is owned by Charleston County Parks. 15. An ordinance to amend Chapter 2 -- Administration; Article IV – Boards and Commissions; Division 5 – Commission on the Arts, of the Code of the City of Charleston. 16. An ordinance to amend Chapter 2 -- Administration; Article II – City Council; Division 1 – Generally, by modifying Sec. 2-24 (Adoption of Ordinances) of the Code of the City of Charleston 17. An ordinance to provide for the annexation of property known as 1444 Joy Avenue (0.23 acre) (TMS# 352-13-00-190), West Ashley, Charleston County, to the City of Charleston, shown within the area annexed upon a map attached hereto and make it part of District 9. The property is owned by Nathan Hertel. (DEFERRED) 18. An ordinance to amend Chapter 2-Department of Public Service; Article VI-Department Public Service. (DEFERRED) 19. An ordinance to amend Chapter 2-Administration; Article XIV-Department of Stormwater Management. (DEFERRED) 20. An ordinance authorizing the Mayor to execute on behalf of the City of Charleston a “Consent to Assignment and Partial Assignment of Lease” by and between the City as assignor, the Military College of South Carolina, a/k/a The Citadel, as assignee, and Dominion Energy South Carolina, inc. as lessor pertaining to the City’s leasehold interest in that certain portion of Dominion owned real property bearing TMS nos. 463-15-01-061 referred to as the “Parking Parcel,” which partial assignment being pursuant to that certain “Land Transfer and Joint Use Agreement” dated February 1, 1994 by and between the City and The Citadel. (DEFERRED) 21. An ordinance to amend Sec. 2-23(b) of the Code of the City of Charleston to provide for keeping summary minutes and video recordings of its proceedings. (DEFERRED) N. Bills up for First Reading: 1. An ordinance to amend Chapter 19-Motor Vehicles and Traffic; Article V-Bicycles, Motorcycles and Certain Vehicles; Division 3-Regulations Applicable to Bicycles and Division 4-Regulation of Certain Vehicles; Article VI-Mopeds; Division 1-Generally. (DEFERRED) 1. An ordinance to amend the Zoning Ordinance of the City of Charleston by changing the Zone Map, which is a part thereof, so that 2147 Saint James Dr (James Island) (approx. 0.39 ac.) 8 (TMS #3430100094) (Council District 11), be zoned Single Family Residential (SR-1) classification. The property is owned by Michael Creasy. (DEFERRED) 3. An ordinance to provide for the annexation of property known as 843 Melrose Drive (0.33 acre) (TMS# 310-02-00-093), West Ashley, Charleston County, to the City of Charleston, shown within the area annexed upon a map attached hereto and make it part of District 2. The property is owned by Paul and Sara Puckett. (DEFERRED) 4. An ordinance to amend Sections 54-208 and 54-227 of the Code of the City of Charleston (Zoning Ordinance) to incorporate minor wording and definition changes to the Short-Term Rental Ordinance intended to clarify terms, submittal and review criteria, and penalties. (DEFERRED) 5. An ordinance to Amend Article XVI (PEDICABS) of Chapter 19 (Motor Vehicles and Traffic) of the Code of the City of Charleston by amending Sections 19-465 “Renewal and expiration of Operating decals” and Section 19-469 “Agreement with the city.” (DEFERRED) 6. An ordinance to amend Chapter 16, Article IV, Section 16-18 of the Code of the City of Charleston; to delete and replace with new language Sections 16- 20, 16-22, 16-23, and 16-24 of the Code of the City of Charleston; and to create Sections 16-24.01, 16-24.02, 16- 24.03, 16-24.04, 16-24.05, 16-24.06, 16-24.07, 16-24.08, 16-24.09, 16-24.10, and 16-24.11 of the Code of the City of Charleston, the purpose of which is to adopt a City of Charleston Fair Housing Act which is substantially equivalent to the Federal Fair Housing Act. (AS AMENDED) (DEFERRED) O. Miscellaneous Business: 1. The next regular meeting of City Council will be Tuesday, April 14, 2026 at 5:00 p.m. In accordance with the Americans with Disabilities Act, people who need alternative formats, ASL (American Sign Language) Interpretation or other accommodation please contact Janet Schumacher at (843) 577-1389 or email to schumacherj@charleston-sc.gov three business days prior to the meeting. CITY OF CHARLESTON STORMWATER DESIGN STANDARDS MANUAL Prepared for: CITY OF CHARLESTON DEPARTMENT OF STORMWATER MANAGEMENT 2 GEORGE STREET CHARLESTON, SOUTH CAROLINA 29401 Prepared by: AECOM 4016 SALT POINTE PARKWAY NORTH CHARLESTON, SOUTH CAROLINA 29405 Project No. 60552163 City of Charleston Stormwater Design Standards Manu al Signature Page i City of Charleston Signature Page I hereby certify that I have examined this Stormwat er Design Standards Manual and, being familiar with the South Carolina Department of Heal th and Environmental Control National Pollutant Discharge Elimination System General Perm it for Stormwater Discharges from Regulated Small Municipal Separate Storm Sewer Syst ems (MS4) and the City of Charleston Department of Stormwater Management, attest that this Manual has been prepared in accordance with the applicable MS4 permit requirements. My signature below constitutes authorization for the commitment of resources necessary for implementation of the Manual. Director, Department of Development Services Date City of Charleston Stormwater Design Standards Manu al Contacts ii Contacts Phone Number Address General Stormwater Questions (843) 724-3754 Fax: (843) 973-7261 2 George Street Suite 2100 Charleston, SC 29401 Stormwater Technical/Design Questions (843) 724-3754 Fax: (843) 973-7261 2 George Street Suite 2100 Charleston, SC 29401 Stormwater Permitting (843) 724-3761 2 George Street Suite 2100 Charleston, SC 29401 Building Inspections: Administration & Plan Review Services (843) 577-1685 2 George Street Ground Floor Charleston, SC 29401 Building Inspections: Inspection Services (843) 724-7441 2 George Street Ground Floor Charleston, SC 29401 Building Inspections: Permit Center (843) 577-5550 2 George Street Ground Floor Charleston, SC 29401 City of Charleston Stormwater Design Standards Manu al Record of Revisions iii Record of Revisions This manual is intended to be a dynamic document with revisions made as new design criteria or technology evolve or it becomes evident that additional measures are needed to ensure the public general welfare. This manual will be amended with City Council’s approval. This manual can also be found on the City of Charleston’s website at htt ps://www.charleston-sc.gov/351/Stormwater- Design-Standards-Manual. Date Revision June 2008 Stormwater Design Standards Manual – Draf t February 2009 Stormwater Design Standards Manual – Draft Final January 2010 Stormwater Design Standards Manual – F inal February 2011 Stormwater Design Standards Manual – Updated Final March 2013 Stormwater Design Standards Manual – Upd ated Final August 2014 Appendix Update July 2020 Stormwater Design Standards Manual - Majo r Revision September 2025 Stormwater Design Standards Manual – Updated Final City of Charleston Stormwater Design Standards Manu al Acknowledgements Acknowledgements The development of the Stormwater Design Standards Manual represents the culmination of a cooperative, collaborative effort among the City of Charleston, the Stormwater Design Standards Task Force, and AECOM. City of Charleston Mayor John Tecklenburg Council Member Peter Shahid Council Member Gary White Council Member Carol Jackson Matthew Fountain Tom O’Brien Kinsey Holton Matt Blackwell Stephen Julka Steve Kirk Chris Morgan Katie McKain Tracy McKee Frank Newham The Stormwater Design Standards Task Force provided guidance and feedback on the content of this document, reviewed drafts, developed and pa rticipated in workshops, and engaged stakeholders. We would like to thank them for their enthusiasm, knowledge, experience, and commitment to the process. Dianne Aghapour, Citizen at Large Jared T. Bramblett, Davis & Floyd Andrew Todd Burke, HLA, Inc. Abraham Champagne, Clemson University Stuart Coleman, CC&T Kelsey Gagnon, Berkeley County Jeannie Lewis, South Carolina Department of Health and Environmental Control Office of Ocean and Coastal Resource Management Bill McKenzie, Daniel Island Associates, LLC Betty Niermann, Seamon, Whiteside & Associates Kirk Richards, South Carolina Department of Transportation Jack Smith, Nelson Mullins Lisa Vandiver, Johns Island Community Association, National Oceanic and Atmospheric Administration Guinn Wallover, Clemson Extension, Ashley Cooper Stormwater Education Consortium Chris Wannamaker, Charleston County James L. Ward, College of Charleston Patrick Arnold, Charleston Homebuilder’s Association Josh Dix, Charleston Trident Association of Realtors City of Charleston Stormwater Design Standards Manu al Table of Contents i Table of Contents City of Charleston Signature Page .................................................................... ...................... i Contacts .......................................... ................................................... ...................................... ii Record of Revisions .................................................................................. ..............................iii Acknowledgements ..................................................................................... .............................. Table of Contents .................................................................................... .................................. i List of Figures ...................................................................................... ....................................ix List of Tables ....................................................................................... ..................................... x Acronyms and Abbreviations ........................................................................... ...................... x Definitions .......................................................................................... .................................... xiv Executive Summary .................................................................................... ......................... xxix Chapter 1 Introduction and Legal Authority ........................................................... ........... 1-30 1.1 Purpose .............................................................................................. ................. 1-30 1.2 Scope ................................................................................................ .................... 1-2 1.3 Legal Authority ...................................................................................... ................. 1-2 1.4 Authorization ........................................................................................ .................. 1-2 1.5 Stormwater-Related Laws, Regulations, and Permits ............................................ 1-3 1.5.1 Federal Clean Water Laws ............................................................................. .. 1-3 1.5.2 Required Federal Permits ............................................................................. ... 1-4 1.5.3 South Carolina Water Laws ............................................................................ . 1-4 1.5.4 Required South Carolina Permits ..................................................................... 1-5 1.6 Section 303(d) Listed Waters and Total Maximum Daily Loads ............................. 1-7 1.7 City of Charleston Ordinances, Regulations, and Standards .................................. 1-7 1.7.1 Qualifying Local Program ............................................................................. .... 1-7 1.7.2 1984 Master Drainage Plan ............................................................................ . 1-7 1.7.3 Level of Service for Maintenance ..................................................................... 1-8 1.8 Easements ......................................... ................................................... ................ 1-8 1.9 Standards Superseded ................................................................................. ......... 1-8 1.10 Other Standards Sought ............................................................................... ......... 1-8 1.11 Duty to Comply ....................................................................................... ............... 1-9 City of Charleston Stormwater Design Standards Manu al Table of Contents ii 1.12 Engineering Design Accountability .................................................................... ..... 1-9 1.13 Severability ......................................................................................... ................... 1-9 1.14 Language and Interpretation of Text .................................................................. .. 1-10 1.15 Disclaimer ........................................................................................... ................. 1-10 Chapter 2 Conceptual Overview ........................................................................ .................. 2-1 2.1 Introduction ......................................................................................... ................... 2-1 2.2 Stormwater and Watersheds ............................................................................ ..... 2-1 2.2.1 Introduction to Stormwater ........................................................................... .... 2-1 2.2.2 What is a Watershed? ................................................................................. ..... 2-2 2.2.3 Changes from Natural Conditions to Development ........................................... 2-3 2.2.4 Effects of Development ............................................................................... ..... 2-4 2.3 Introduction to Soils ................................................................................ ............... 2-5 2.4 Water Quality ........................................................................................ ................. 2-7 2.4.1 Suspended Solids ..................................................................................... ....... 2-8 2.4.2 Oxygen Demanding Matter and Bacteria ......................................................... 2-9 2.4.3 Nutrients ............................................................................................ .............. 2-9 2.4.4 Illicit Discharge Detection and Elimination ........................................................ 2 -9 2.5 Water Quantity ....................................................................................... .............. 2-10 2.5.1 Coastal and Tidal Flooding ........................................................................... . 2-11 2.5.2 Extreme Event (Flash) Flooding ..................................................................... 2 -12 2.5.3 Fluvial (Riverine) Flooding .......................................................................... ... 2-13 2.5.4 Groundwater Flooding ................................................................................. .. 2-14 2.5.5 Surface Flooding ..................................................................................... ....... 2-14 2.6 Principles of Floodplain Management .................................................................. 2-15 2.7 Master Planning for Stormwater ....................................................................... .... 2-16 2.8 Principles of Stormwater Management ................................................................ 2 -16 2.8.1 Introduction to Stormwater Management ....................................................... 2-17 2.8.2 Innovative Design .................................................................................... ...... 2-17 2.8.3 Site Planning ........................................................................................ .......... 2-17 2.9 Types of Development ................................................................................. ........ 2-20 2.9.1 New Development ...................................................................................... .... 2-20 City of Charleston Stormwater Design Standards Manu al Table of Contents iii 2.9.2 Redevelopment ........................................................................................ ...... 2-21 2.9.3 Brownfields .......................................................................................... .......... 2-21 2.10 Introduction to Permanent Best Management Practices....................................... 2-21 2.11 Sea Level Rise .................................... ................................................... ............. 2-22 Chapter 3 Design Requirements ........................................................................ ................ 3-23 3.1 Introduction ......................................................................................... ................. 3-23 3.2 Determination of Construction Activity ............................................................... .. 3-23 3.3 Design Approach ...................................................................................... ........... 3-23 3.4 Stormwater Hydrology and Routing ..................................................................... .. 3-3 3.4.1 Introduction to Hydrologic Requirements ......................................................... 3-3 3.4.2 Rainfall and Design Storms ........................................................................... ... 3-4 3.4.3 Reservoir Routing .................................................................................... ........ 3-4 3.4.4 Recommended Methods and Design Procedures ............................................ 3-4 3.4.5 Time of Concentration ................................................................................ ...... 3-6 3.4.6 Collection and Conveyance Requirements....................................................... 3-6 3.4.7 Roadway Drainage Design ............................................................................ 3 -14 3.5 Redevelopment Requirements ........................................................................... . 3-14 3.5.1 Redevelopment Standards ............................................................................. 3-14 3.5.2 Redevelopment Exemptions .......................................................................... 3- 15 3.6 Special Protection Areas.............................................................................. ........ 3-15 3.6.1 Areas Associated With Known Flooding ......................................................... 3-15 3.6.2 Areas Discharging to Total Maximum Daily Load and Impaired Waters ......... 3-16 3.6.3 Basin Specific Requirements ......................................................................... 3-17 3.7 Sea Level Rise and Tailwater Conditions ............................................................. 3-20 3.8 Soils and Geotechnical Information ................................................................... .. 3-21 3.9 Permanent Stormwater Design .......................................................................... .. 3-21 3.9.1 Introduction to Permanent Stormwater Design Requirements ........................ 3-22 3.9.2 Permanent Stormwater Design Volumes ....................................................... 3-23 3.9.3 Project Discharge .................................................................................... ....... 3-25 3.9.4 1 Percent Probability of Exceedance Storm Event Analysis ........................... 3-25 3.9.5 Recommended Methods and Design Procedures .......................................... 3-26 City of Charleston Stormwater Design Standards Manu al Table of Contents iv 3.10 Detention and Infiltration Requirements .............................................................. . 3-27 3.10.1 Detention and Retention Requirements ......................................................... 3-28 3.10.2 Detention-Specific Requirements ................................................................... 3- 29 3.10.3 Wet Detention-Specific Requirements ............................................................ 3-29 3.10.4 Infiltration Requirements ............................................................................ .... 3-30 3.11 Equalization Pipes and Submerged Systems ....................................................... 3-31 3.12 Accepted Permanent Structural and Non-Structural Be st Management Practices ............................................................................................ .................. 3-31 3.12.1 Bioretention Basins .................................................................................. ...... 3-34 3.12.2 Permeable Pavement Systems ...................................................................... 3-34 3.12.3 Infiltration Trenches/Basins ......................................................................... ... 3-35 3.12.4 Green Roofs ....................................... ................................................... ........ 3-35 3.12.5 Rainwater Harvesting ................................................................................. .... 3-36 3.12.6 Impervious Surface/Roof Disconnection ........................................................ 3-36 3.12.7 Open Channel Systems – Grass Channel and Dry Swale .............................. 3-37 3.12.8 Site Reforestation ................................................................................... ....... 3-37 3.12.9 Stormwater Filtering Systems - Perimeter Sand Filter .................................... 3-37 3.12.10 Dry Detention Practices – Dry Ponds ........................................................ 3-38 3.12.11 Wet Pond ............................................................................................. ..... 3-38 3.12.12 Stormwater Wetlands ................................................................................ 3 -39 3.12.13 Vegetated Filter Strip ............................................................................... . 3-39 3.12.14 Underground Detention ............................................................................. 3- 43 3.13 Site Grading Requirements ............................................................................ ...... 3-45 3.14 Erosion Prevention and Sediment Control ........................................................... 3- 46 3.14.1 Introduction to Erosion Prevention and Sediment Control Requirements ....... 3-46 3.14.2 Rainfall, Design Storms, and Design Volumes ............................................... 3-46 3.14.3 Accepted Erosion Prevention and Sediment Control Be st Management Practices ............................................................................................ ............ 3-47 3.14.4 Erosion Prevention and Sediment Control Best Management Practice Design Requirements ...................................... ................................................... ....... 3-50 3.15 Landscape Design ..................................................................................... .......... 3-52 3.15.1 Best Management Practice Soils and Compaction ......................................... 3-53 City of Charleston Stormwater Design Standards Manu al Table of Contents v 3.15.2 Plant Selection ...................................................................................... ......... 3-53 3.15.3 Fertilizer, Pesticides, Irrigation, and Mulch ..................................................... 3- 54 3.16 Maintenance Access and Easements .................................................................. 3- 55 3.16.1 Stormwater Pipe ...................................................................................... ...... 3-56 3.16.2 Open Conveyances ..................................................................................... .. 3-56 3.16.3 Detention Ponds ...................................................................................... ...... 3-56 3.16.4 Other Stormwater Facilities and Best Management Practices ........................ 3-56 3.16.5 Offsite Easements .................................................................................... ...... 3-57 3.17 Additional Design Considerations ..................................................................... ... 3-57 3.17.1 Safety ............................................ ................................................... ............. 3-57 3.17.2 Signage and Stenciling ............................................................................... ... 3-57 Chapter 4 Construction Activity Permitting ........................................................... ............. 4-1 4.1 Overview of Application/Approval Process ............................................................. 4-1 4.2 Roles and Responsibilities ........................................................................... .......... 4-1 4.2.1 City of Charleston Stormwater Management .................................................... 4-1 4.2.2 Applicant, Owner/Operator (Permittee) ............................................................ 4-1 4.2.3 Engineer-of-Record ................................................................................... ....... 4-2 4.3 Permanent Structural Stormwater Facility Ownership ............................................ 4-2 4.3.1 Residential .......................................................................................... ............. 4-2 4.3.2 Non-Residential ...................................................................................... ......... 4-2 4.3.3 Easements ............................................................................................ ........... 4-3 4.4 Construction Activity Applications ................................................................... ....... 4-3 4.5 Types of Applications ................................................................................ ............. 4-4 4.5.1 Single Family Residence Applications .............................................................. 4- 4 4.5.2 Small Construction Activity Applications (Type I).............................................. 4-4 4.5.3 Medium Construction Activity Applications (Type II) ......................................... 4-5 4.5.4 Large Construction Activity Applications (Type III) ......................................... 4-10 4.5.5 Linear/Utility Applications .......................................................................... ..... 4-12 4.6 Additional Permits and Approvals ..................................................................... ... 4-12 4.6.1 South Carolina Department of Transportation Encroachment Permits ........... 4-12 4.6.2 US Army Corps of Engineers Permits ............................................................ 4-13 City of Charleston Stormwater Design Standards Manu al Table of Contents vi 4.6.3 South Carolina Department of Health and Environment al Control Office of Ocean and Coastal Resource Management Coastal Zone Consistency Certification ........................................................................................ ............ 4-13 4.7 Approval of Applications ............................................................................. ......... 4-13 4.8 Changes After Project Approval ....................................................................... .... 4-13 4.8.1 Changes to Approved Applications ................................................................ 4-14 4.8.2 Transfer of Responsibility (Change of Owner) ................................................ 4-14 4.8.3 Expiration of City Approval .......................................................................... ... 4-14 4.9 Fees .............................................. ................................................... ................... 4-14 4.9.1 Construction Activity Fee ............................................................................ ... 4-15 4.9.2 Major Modification ................................................................................... ....... 4-16 4.10 Exemptions and Design Exceptions ..................................................................... 4-16 Chapter 5 Construction Phase ......................................................................... .................... 5-1 5.1 Roles and Responsibilities ........................................................................... .......... 5-1 5.1.1 City of Charleston Stormwater Management .................................................... 5-1 5.1.2 Applicant, Owner/Operator (Permittee) ............................................................ 5-1 5.1.3 Inspector ............................................................................................ .............. 5-1 5.2 Pre-Construction Requirements ........................................................................ ..... 5-1 5.2.1 Pre-Construction Activities .......................................................................... ..... 5-2 5.2.2 Inspection Fees ................................... ................................................... ......... 5-2 5.2.3 Other Planning Considerations ........................................................................ 5-2 5.2.4 Pre-Construction Meeting ............................................................................. ... 5-3 5.3 Construction Requirements ............................................................................ ....... 5-4 5.3.1 Implement and Maintain Erosion Prevention and Sedim ent Control Best Management Practices ................................................................................. ... 5-4 5.3.2 Conduct Inspections .................................................................................. ...... 5-4 5.4 Changes During Construction .......................................................................... ...... 5-6 5.4.1 Changes to Approved Design .......................................................................... 5-6 5.4.2 Changes to Approved Stormwater Pollution Prevention Plan ........................... 5-6 5.4.3 Qualifications ....................................................................................... ............ 5-8 5.4.4 Transfer of Responsibility (Change of Owner) .................................................. 5-8 5.4.5 Expiration of City Approval .......................................................................... ..... 5-9 City of Charleston Stormwater Design Standards Manu al Table of Contents vii 5.4.6 Notifications ........................................................................................ ............. 5-9 Chapter 6 Post-Construction .......................................................................... ..................... 6-1 6.1 Overview of Project Closeout Requirements .......................................................... 6 -1 6.2 Final Stabilization and Project Closeout ............................................................. .... 6-1 6.2.1 Single-Family Residential ............................................................................ ..... 6-1 6.2.2 Subdivision/Road Construction Plan Projects .................................................. 6-2 6.2.3 Utility Projects ..................................................................................... ............. 6-2 6.3 Stormwater Record Drawings (As-Builts) ............................................................... 6-2 6.3.1 Piped Drainage Systems ............................................................................... ... 6-2 6.3.2 Open Channel Drainage Systems .................................................................... 6-3 6.3.3 Stormwater Management Pond or Basin .......................................................... 6-3 6.3.4 Project Datum ........................................................................................ .......... 6-4 6.3.5 Certifications Statement ............................................................................. ...... 6-4 6.4 Maintenance Plan and Covenants ....................................................................... .. 6-4 6.5 Final Plat ........................................ ................................................... .................... 6-4 6.6 Stormwater Video Inspection .......................................................................... ....... 6-5 6.7 Stormwater Facility Warranty ......................................................................... ........ 6-5 6.8 Hydrostatic Testing and Dye Testing .................................................................. ... 6-6 6.9 In Situ Testing of Permanent Structural Best Management Practices that Rely on Infiltration ...................................................................................... .................... 6-7 6.10 City Roadways Inventory/Stormwater Geographic Information System .................. 6-7 Chapter 7 City Inspection and Enforcement ............................................................ ........... 7-1 7.1 Stormwater Management Inspections .................................................................... 7-1 7.1.1 City Inspection Duties and Responsibilities ...................................................... 7-1 7.1.2 Inspector Qualifications ............................................................................. ....... 7-1 7.1.3 Inspection Reports ................................................................................... ........ 7-2 7.2 Enforcement .......................................................................................... ................ 7-2 7.2.1 Administrative Order ................................................................................. ....... 7-2 7.2.2 Notice of Violation .................................................................................. .......... 7-4 7.2.3 Uniform Ordinance Summons .......................................................................... 7 -5 7.2.4 Civil and Criminal Penalties ......................................................................... .... 7-5 Chapter 8 References ................................................................................. .......................... 8-1 City of Charleston Stormwater Design Standards Manu al Table of Contents viii List of Appendices ................................................................................... ................................. I Appendix A. NPDES Permits ............................................................................ ....................... II Appendix B. City of Charleston Forms ................................................................. ..................III Appendix C. Green Infrastructure Center Curve Number Reduction Worksheet ............... IV Appendix D. Small Construction Activity Guidelines and Checklist ................................... VI Appendix E. Medium and Large Construction Activity Guidelines and Checklist ............ VII Appendix F. Linear/Utility Guidelines and Checklist .......................................................... VIII Appendix G. Technical Procedure Documents ............................................................ ......... IX City of Charleston Stormwater Design Standards Manu al List of Figures ix List of Figures Figure 1-1. Hierarchy of laws and regulations from Federal to local governments ................... 1-3 Figure 2-1. Diagram depicting changes in runoff and infiltration with increasing amounts of impervious surface ................................................................................... ............ 2-2 Figure 2-2. Diagram depicting role of wetlands in a watershed ........................................ ....... 2-3 Figure 2-3. Changes to a stream’s geometry due to watershed development ......................... 2-4 Figure 2-4. Soil mineral sizes ....................................................................... ........................... 2-6 Figure 2-5. Stormwater flow changes associated with urbanization ....................................... 2-11 Figure 2-6. Coastal flooding causes and impacts ...................................................... ............ 2-12 Figure 2-7. Extreme event flood causes and impacts ................................................... ......... 2-13 Figure 2-8. Groundwater flooding causes and impacts .......................................................... 2-14 Figure 2-9. Surface flooding causes and impacts ...................................................... ............ 2-15 Figure 2-10. Conventional parking lot layout vs. pa rking lot layout using low impact development techniques ............................................................................... ...... 2-19 Figure 2-11. Observed and Predicted “Minor Coastal Flooding” In Charleston ...................... 2-22 City of Charleston Stormwater Design Standards Manu al Acronyms and Abbreviations x List of Tables Table 2-1. Recurrence interval compared to annual exceedance probability ........................... 2-2 Table 2-2. Characteristics of NRCS Hydrologic Soil Group Classifications .............................. 2-7 Table 2-3. Typical stormwater pollutants and sources ............................................................. 2-8 Table 2-4. Typical illicit discharge sources ......................................................... ................... 2-10 Table 3-1. 24-hour design storm precipitation data for Charleston, South Carolina ................. 3-4 Table 3-2. Recommended methodologies based on land disturbance area ............................ 3-4 Table 3-3. Recommended hydrologic methods for desig ning various stormwater management systems and controls ...................................................................... 3-5 Table 3-4. Maximum permissible velocities for channels ....................................................... 3-13 Table 3-5. Runoff Control Practices ................................................................................... 3-16 Table 3-6. Tiered approach rainfall depths based on a 24-hour duration storm ..................... 3-23 Table 3-7. Structural BMPs for Water Quantity and/or Quality ............................................... 3-32 Table 3-8. Example of a maintenance plan for a vegetative filter strip ................................... 3-43 Table 3-9. Erosion prevention BMP suggested uses ..................................................... ........ 3-48 Table 3-10. Temporary sediment control BMP suggested uses ............................................ 3-49 Table 3-11. Runoff control and conveyance BMP suggested uses ........................................ 3-50 Table 3-12. Resources for plant selection ............................................................ ................. 3-54 Table 3-13. Resources for invasive plant species ..................................................... ............ 3-54 Table 3-14. Landscaping activity to establish final stabilization vegetation ............................ 3-55 Table 3-15. Storm drain pipe easements ............................................................... ................ 3-56 Table 4-1. Example of a Design Exceptions Table ...................................................... .......... 4-17 Table 5-1. Required notifications .................................................................... ......................... 5-9 Acronyms and Abbreviations AASHTO American Association of State Highway and Tr ansportation Officials AEP Annual Exceedance Probability AO Administrative Order ASCE American Society of Civil Engineers ASTM American Society for Testing and Materials City of Charleston Stormwater Design Standards Manu al Acronyms and Abbreviations xi BMP Best Management Practice CAA Construction Activity Application CAP Citizen Access Portal CEPSCI Certified Erosion Prevention and Sediment Co ntrol Inspector CFR Code of Federal Regulations CGP Construction General Permit City City of Charleston COA Close-Out Application CPMSF Covenant for Permanent Maintenance of Stormwa ter Facilities C-SWPPP Comprehensive Stormwater Pollution Preventi on Plan CWA Clean Water Act CZC Coastal Zone Consistency CZMA Federal Coastal Zone Management Act of 1972 DO Dissolved Oxygen ECB Erosion Control Blanket EPA Environmental Protection Agency EPSC Erosion Prevention and Sediment Control FEMA Federal Emergency Management Agency FIPS Federal Information Processing Standard fps feet per second GIS Geographic Information System H:V Horizontal to Vertical HEC Hydrologic Engineering Center HEC-RAS Hydrologic Engineering Center’s River Analy sis System HOA Home Owners Association HSG Hydrologic Soil Group HY8 Culvert Hydraulic Analysis Program ICPR Interconnected Channel and Pond Routing IGP Industrial General Permit LCP Larger Common Plan LID Low Impact Development LOS Level of Service MHHW Mean Higher High Water MS4 Municipal Separate Storm Sewer System NAD North American Datum City of Charleston Stormwater Design Standards Manu al Acronyms and Abbreviations xii NAVD North American Vertical Datum NERC Natural Environment Research Council NOAA National Oceanic and Atmospheric Administrati on NOI Notice of Intent NOT Notice of Termination NOV Notice of Violation NPDES National Pollutant Discharge Elimination Syst em NRCS Natural Resources Conservation Service OCRM Office of Ocean and Coastal Resource Manageme nt OS-SWPPP On-site Stormwater Pollution Prevention Pl an PDF Portable Document Format PE Polyethylene PVC Polyvinyl Chloride QLP Qualifying Local Program RCP Reinforced Concrete Pipe SC811 South Carolina 811 SCDHEC South Carolina Department of Health and Envi ronmental Control SCDOT South Carolina Department of Transportation SCS Soil Conservation Service SEDCAD Sediment Erosion Discharge by Computer Aided Design SEDPRO Sediment Erosion Discharge Program SFHA Special Flood Hazard Area SFR Single Family Residence SMS4 Small Municipal Separate Storm Sewer System SMSRA South Carolina Stormwater Management and Sedi ment Reduction Act of 1991 SPCC Spill Prevention, Control, and Countermeasure SRC Subdivision Review Committee SWAT Soil and Water Assessment Tool SWDSM Stormwater Design Standards Manual SWMM Stormwater Management Model SWMP Stormwater Management Plan or Stormwater Manag ement Program SWPPP Stormwater Pollution Prevention Plan TMDL Total Maximum Daily Load TRC Technical Review Committee TRM Turf Reinforced Mat City of Charleston Stormwater Design Standards Manu al Acronyms and Abbreviations xiii TSS Total Suspended Solids UOS Uniform Ordinance Summons USACE United States Army Corps of Engineers USDA United States Department of Agriculture USDOT United States Department of Transportation USGS United States Geological Survey WQV Water Quality Volume City of Charleston Stormwater Design Standards Manu al Definitions xiv Definitions Words used in this manual shall have customary mean ings as determined by the standard dictionary definition except for the following spec ific words and terms that are herein defined or are otherwise defined in the City of Charleston Ord inance, authorizing regulations listed in Section 1.5 , or applicable Federal Emergency Management Agency regulations. The Department of Stormwater Management has the right to define or interpret any other word or term contained within this manual. Accommodate : water elevation not exceeding the crown of the pipe or culvert crossing under a roadway; coming within 12 inches of the top of the ditch or channel for the design storm; or not encroaching on less than one-half of a travel lane for street drainage, curbs, and gutters for the design storm event. Algal Bloom: the rapid increase in the population of algae in an aquatic system. Applicant : a person, firm, governmental agency, partnership, limited liability company, or any other entity who seeks to obtain approval under the requirements of Chapter 27 in the City of Charleston Ordinance and who, in addition to the property owner or operator, will be responsible for the land disturbing activity and related mainte nance thereof. The Applicant executes the necessary forms to obtain approval for a permit for a land disturbing activity. Appropriate Plan Approval Authority: South Carolina Department of Health and Environmental Control, local government, or conservation district that is responsible in a jurisdiction for review and approval of Stormwater Management and Erosion P revention and Sediment Control Plans. This function will be carried out by the City of Charleston. Backwater: the increase in water surface elevation relative to the elevation occurring under natural channel and floodplain conditions upstream of a stormwater facility. Bankfull Event: the flow condition where the highest stresses are a pplied to streambanks, causing streambank erosion and channel enlargement. Best Management Practice (BMP): any structural or non-structural measure or drainage facility used for the control of stormwater runoff, be it fo r quantity or quality control. Best management practices also include schedules of activities, prohibitions of practices, maintenance procedures, treatment requirements, operating procedures, and o ther management practices to control site runoff, spillage or leaks, sludge or waste disposal , drainage from raw material storage, or measures that otherwise prevent or reduce the pollutant loading of receiving water(s). Structural best management practices may be referred to as “Stormwater Control Measure”, as in the case of ASCE language. Brownfield: a formal industrial or commercial site where future use is affected by environmental contamination. City of Charleston Stormwater Design Standards Manu al Definitions xv Building : any structure built for support, shelter, or enclosure for any occupancy or storage. Certified Erosion Prevention and Sediment Control I nspector (CEPSCI) : a person with the responsibility for conducting inspections during co nstruction and maintenance inspections after the land disturbing activity is completed as certified by South Carolina Department of Health and Environmental Control. Certified Stormwater Plan Reviewer : a person with the responsibility for reviewing Stormwater Management and Erosion Prevention and Sediment Cont rol Plans for the City as certified by South Carolina Department of Health and Environmental Control. Channel : a stormwater conveyance open to the atmosphere fl owing under the influence of gravity, including, but not limited to, natural waterways, canals, ditches, swales, and flumes. Construction or Construction Activity : an activity involving clearing, grading, transpor ting, filling, or any other activity that causes land to be exposed to the danger of erosion, or that might create an alteration to an existing drainageway or other component of the City’s stormwater management system or drainage facility. Construction Activity Application (CAA): the set of drawings, specifications, design calculations, Stormwater Pollution Prevention Plan, and other documents necessary to apply for a construction activity permit. Contour : representative line on a topographic map connecting points of equal elevation. Conveyance System: private and public drainage facilities other than sanitary sewers within the City’s municipal separate storm sewer system by whi ch stormwater runoff may be conveyed to receiving waters, and includes but is not limited t o roads, streets, constructed channels, storm drains, pipes, street gutters, inlets to storm drains or pipes, catch basins, or pumping systems. Covenants : the Covenants for Permanent Maintenance of Stormw ater Facilities, which is a permanent maintenance agreement between the property Owner and the City of Charleston, for maintenance of permanent stormwater best management practices described in construction plans approved by the City of Charleston, and any other permanent stormwater best management practices thereafter constructed on the Owner’s property. City of Charleston Stormwater Design Standards Manu al Definitions xvi Critical Area: a critical area is defined as coastal waters, tidel ands, beaches, and beach/dune system in South Carolina Code of Laws: Title 48 Env ironmental Protection and Conservation Section 48-39-10. A beach/dune system is the area from the mean high-water mark to the setback line as determined in Section 48-39-280. Culvert : an enclosed symmetrical channel of comparatively short length installed to convey water from one side of an embankment to the other, typically under a roadway, and mainly used to divert stream or rainfall runoff to prevent erosion or flooding on roadways. Design Exception: the modification of the minimum stormwater managem ent requirements contained in Chapter 27 of the City of Charleston O rdinance and the Stormwater Management Program for specific circumstances where strict adh erence to the requirements would result in unnecessary hardship and not fulfill the intent of Chapter 27 of the City of Charleston Ordinance. This was previously known as a variance. Detention : the collection and storage of stormwater runoff i n a surface or subsurface facility for subsequent controlled discharge to a conveyance system or receiving water. Detention Structure: a permanent stormwater management structure whose primary purpose is to temporarily store stormwater runoff and release the stored runoff at controlled rates. Development: any of the following actions undertaken by a perso n, a firm, a governmental agency, a partnership, a limited liability company, or any other individual or entity, without limitation: • Division or subdivision of a lot, tract, parcel, o r other divisions by plat or deed • Construction, installation, or alteration of land, a structure, impervious surface, or drainage facility • Clearing, scraping, grubbing, or otherwise signifi cantly disturbing the soil, vegetation, mud, sand, or rock of a site • Adding, removing, exposing, excavating, leveling, grading, digging, burrowing, dumping, piling, dredging, or otherwise disturbing the soil, vegetation, mud, sand, or rock of a site Discharge: when used without a qualifier, refers to “discharge of a pollutant” as defined at South Carolina Regulation 61-9, Water Pollution Control Permits, Section 122.2. Ditch : a drainage channel in the earth created by natura l or artificial means to convey surface and/or subsurface water, flowing continuously or intermittently. Ditches are generally smaller than those conveyances referred to as channels. Drainage : a general term applied to the removal of surface or subsurface water from an area either by gravity via natural means or by systems constructed to remove water and is commonly applied herein to surface water. City of Charleston Stormwater Design Standards Manu al Definitions xvii Drainage Area: an area contributing stormwater runoff to a single point. In this document, the term Drainage Area is considered synonymous with Watershed . Drainage Easement: the right of access of stormwater runoff from adjacent drainage basins into the drainageway within the defined easement as defi ned by Section 54-1051(i) Ordinance No. 2018-031 § 11, 4-10-18. Drainage Facility : any component of the drainage system. Drainage System : the surface and/or subsurface system that collect s and conveys stormwater and surface water, and includes watercourses, waterbodies, receiving waters, and wetlands. Easement : an authorization by a property owner to the general public, a corporation, or a certain person or persons for the use of any designated par t of his property for a specific purpose, as defined by Ordinance No. 2007-158, § 2, 8-21-07; Or dinance No. 2017-110, § 1, 9-13-17). An easement is also defined in the Zoning Ordinance as the right of use for access granted on, above, under, or across a tract of land by the landowner to another person or entity (Section 54- 1051(i) Ordinance No. 2018-031 § 11, 4-10-18). Elevation : height in feet above a known datum, such as NAVD88. Embankment or Fill : a deposit of soil, rock, or other material placed by construction methods. Equalization Pipe: a pipe that maintains equal water surface elevation in all connected ponds in a closed system. Erosion: the general process by which soils or rock fragmen ts are detached and moved by the action of wind, water, ice, and gravity. Erosion Prevention: measures employed to prevent erosion, including so il stabilization practices, limited grading, mulch, temporary or per manent cover, compost application, and construction phasing. Eutrophication: the process by which a body of water becomes enrich ed in nutrients that stimulate growth of aquatic plant life, usually resulting in the depletion of dissolved oxygen. Evapotranspiration: the process by which water is transferred from the land to the atmosphere by evaporation from the soil and other surfaces and by transpiration from plants. Extended Detention: basin that provides a storage volume above the invert of the lowest outlet, to temporarily detain a portion of stormwater runof f for an extended time period. The basin provides water quality through sedimentation of particulates during the extended time period. Final Stabilization : having 70 percent or more of the entire site with permanent coverage in good condition. City of Charleston Stormwater Design Standards Manu al Definitions xviii Flood or Flooding : a temporary rise in the level of water that resul ts in the inundation of areas not ordinarily covered by water. The types of flood events that occur in the City of Charleston are: • Coastal (Tidal) Flooding: occurs during high tides and is not dependent on we ather conditions. Frequency of tidal flooding increases with effects of sea level rise and moon phases. • Extreme Event (Flash) Flooding: occurs when intense rainfall makes water rise quic kly and flow at a high speed for a short amount of time. • Fluvial (Riverine) Flooding: occurs when the capacity of a river’s channel is e xceeded as a result of intense or sustained rainfall across the catchment. • Groundwater Flooding: occurs when the water table rises up to the surface during a prolonged wet period. Low-lying areas, areas near a quifers, and properties with cellars or basements are more likely to experience groundwater flooding. • Surface Flooding: occurs when the volume of rainfall is unable to dr ain away through the drainage systems or infiltrate into the land, and instead flows over land. Floodplain: an area of low-lying ground that may be submerged by floodwaters. Grading: the excavating, filling (including hydraulic fill) , or stockpiling of earth material, or any combination thereof, including the land in its excavated or filled condition. Green Infrastructure (GI): an adaptable term used to describe an array of mat erials, technologies, and practices that use natural system s or engineered systems that mimic natural processes to enhance overall environmental quality and provide utility services. As a general principal, green infrastructure techniques use soils and vegetation to infiltrate, evapotranspirate, and/or recycle stormwater runoff. Examples of green infrastructure include green roofs, porous pavement, rain gardens, and vegetated swales. Green Space: an area of grass, trees, or other vegetation set ap art for recreational or aesthetic purposes in an otherwise urban environment. Hydrologic Soil Group (HSG): a classification of soils based on the soil’s runof f potential used by the Natural Resource Conservation Service. Illicit Discharge or Illegal Discharge: any activity that results in a discharge to the Ci ty of Charleston stormwater management system or drainage facility or receiving waters that is not composed entirely of stormwater except: • Discharge pursuant to a National Pollutant Dischar ge Elimination System permit (other than the National Pollutant Discharge Elimination System permit for discharges from the City of Charleston municipal separate storm sewer system) • Discharges resulting from fire-fighting activities Impaired Waters: waterbodies with pollutant load exceeding the Total Maximum Daily Load level established by the State in which it is located and approved by the Environmental Protection Agency. City of Charleston Stormwater Design Standards Manu al Definitions xix Impervious Surface: a surface that has been compacted or covered with a layer of material so that it is highly resistant to infiltration by wate r, including conventionally surfaced streets, roofs , sidewalks, parking lots, and other similar structures. Infiltration: the passage or movement of water through the soil profile. King Tide: the highest seasonal tides that occur each year. Land Disturbing Activity: any use of the land by any person that results in a change in the natural cover or topography that may cause erosion and contribute to sediment and alter the quality and quantity of stormwater runoff. Larger Common Plan (LCP): broadly defined as any announcement or piece of documentation (including a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, computer design, etc.) or physical demarcation (including boundary signs, lot stakes, surveyor markings, etc.) indicating construction activities may occur on a specific plot. A common plan for development or sale identifies a si te where multiple separate and distinct construction activities (areas of disturbance) are occurring on contiguous areas. Such sites may have one operator or owner or several operators and owners. Construction activities may take place at different times on different schedules, in separate stages, in separate phases, in combination with other construction activities. Each Developer, Operator, or Owner for each site or project determined to be a part of a Larger Common Plan is subject to permitting requirements as defined by Chapter 27 in the City of Charleston Ordinance and the City of Charleston Stormwater Design Standards Manual. Level Spreader : a structure that is designed to uniformly distrib ute concentrated stormwater runoff over a large area. Level spreaders come in m any forms, depending on the peak rate of inflow, duration of use, type of pollutant, and site conditions. All designs follow the same principle: • Concentrated flow enters the spreader through a pi pe, ditch, or swale. • The flow is retarded, and energy is dissipated. • The flow is distributed throughout a long linear s hallow trench or behind a low berm. • Water then flows over the berm/ditch along the ent ire length. Low Impact Development (LID): a set of principles and design components used to manage stormwater runoff by mimicking natural conditions and limiting pollutant transport through source control. Maintenance: any action necessary to preserve stormwater system components, including conveyances, facilities, and BMPs, in proper workin g condition, to serve the intended purposes and to prevent structural failure of such components. Maximum Extent Practicable: a technology-based control standard used in the mu nicipal stormwater program against which South Carolina Dep artment of Health and Environmental City of Charleston Stormwater Design Standards Manu al Definitions xx Control Bureau of Water and permittees assess wheth er an adequate level of control has been proposed in the Stormwater Management Program. Municipal Separate Storm Sewer System (MS4): conveyances or system of conveyances (including roads with drainage systems, highways, rights-of-way, municipal streets, catch basins, curbs, gutters, ditches, man-made channels, storm drains, detention ponds, and other stormwater facilities) that receives, transports, stores, or treats stormwater runoff and that is: • Owned or operated by the City of Charleston • Designed or used for collecting or conveying storm water • Not a combined sewer system • Not a part of a publicly owned treatment works South Carolina Department of Transportation roadways are considered an MS4, and are covered by their own individual permit. National Pollutant Discharge Elimination System (NP DES) Permit: permit for stormwater discharges issued by South Carolina Department of Health and Environmental Control pursuant to the Clean Water Act and the Federal stormwater d ischarge regulations (40 CFR 122.26) that allows for restricting pollutant loads as necessary to meet water quality standards. Navigable Waters: According to the Environmental Protection Agency, a waterbody qualifies as a “navigable water of the United States” if it meets any of the tests set forth in 33 CFR 329 (e.g., the waterbody is (a) subject to the ebb and flow of the tide or (b) presently used, or has been used in the past, or may be susceptible for use (with or without reasonable improvements) to transport interstate or foreign commerce. Non-erodible: a material (e.g., natural rock, riprap, concrete, plastic) that will not experience surface wear due to natural forces of wind, water, ice, gravity, or a combination of those forces. Nonpoint Source Pollution: pollution contained in stormwater runoff from ill-d efined, diffuse sources. Non-stormwater Discharge: any discharge to the stormwater system or Waters of the State that is not composed entirely of stormwater. Operator : the person who is operating the property on behalf of the owner, the operator’s agent, or any other person who acts in the operator’s behalf. Outlet Facility : stormwater management facility designed to regula te the elevation, rate, and volume of stormwater discharge from detention facilities. Owner: the legal property owner, the owner’s agent, or any other person who acts in the owner’s behalf. City of Charleston Stormwater Design Standards Manu al Definitions xxi Oxygen Demand: the amount of oxygen needed by aerobic organisms to break down organic material present in water. Person and/or Parties: any and all persons, and/Parties that includes any individual, association, firm, corporation, limited liability company, business trust, estate, trust, partnership, two or more persons having a joint or common interest, or an ag ent or employee thereof, or any other legal entity. Person Responsible for Land Disturbing Activity : • Person who has or represents having financial or o perational control over the land disturbing activity • Landowner or person in possession or control of th e land who directly or indirectly allowed the land disturbing activity or has benefited from it o r who has failed to comply with any provision of this ordinance. pH: a quantitative measure of the acidity or basicity of aqueous or other liquid solutions. The scale ranges from 0 to 14 where low pH indicates the solu tion is acidic, high pH indicates the solution is basic/alkaline, and a pH of 7 indicates the solution is neutral. Pollutant: anything that may cause or contribute to exceedanc es of water quality standards, including but not limited to sediment, bacteria, nu trients, dredged spoil, solid waste, incinerator residue, filter backwash, sewage, garbage, sewage s ludge, munitions, chemical wastes, biological materials, radioactive materials, heat, wrecked or discarded equipment, rock, sand, soil, and industrial, municipal, and agricultural waste discharged into receiving waters. Pollutant Load: a numeric value representing an estimate of the ma ss of a pollutant entering a stormwater system or receiving water. Post-Development : the conditions that exist following the completio n of the land disturbing activity in terms of topography, vegetation, land u se and rate, volume, quality, and direction of stormwater runoff. Pre-Development: the conditions that existed prior to the initiati on of the land disturbing or redevelopment activity, or at the time of application, whichever is earlier, in terms of topography, vegetation, land use and rate, volume, quality, and direction of stormwater runoff. Project : improvements and structures proposed by the appli cant to be built on a defined site as part of a common plan of construction, development, or redevelopment. Public Infrastructure: infrastructure that is owned by the public, represented by the government, for public use. Includes public water, sewer and st ormwater facilities, electric lines, gas lines, telephone or cable television lines, curbs, and sid ewalks located within the public right-of-way, and other public improvements. City of Charleston Stormwater Design Standards Manu al Definitions xxii Qualified Individual : a licensed professional (as defined by the South Carolina Construction General Permit) who is authorized to prepare, amend , certify, and stamp a construction Stormwater Pollution Prevention Plan. The Qualified Individual is knowledgeable in the principles and practices of erosion prevention and sediment co ntrols and possesses the skills to assess conditions at the construction site that could impa ct stormwater quality and to assess the effectiveness of an erosion prevention and sediment control measures selected to control the quality of stormwater discharges from the construction activity. Rate : volume of water passing a point per unit of time, generally expressed in cubic feet per second (cfs). Receiving Water(s) or Waters of the State : refers to any lakes, bays, sounds, ponds, impounding reservoirs, springs, wells, rivers, streams, creeks, estuaries, marshes, inlets, canals, the Atlantic Ocean within the territorial limits of the State of South Carolina, and all other bodies of surface or underground water, natural or artific ial, public or private, inland or coastal, fresh or salt. Redevelopment: development on a previously developed site where t he impervious surface on the previously developed site is equal to or greater than 20 percent of the total site and where any repair, reconstruction, or improvement to that site or to any structures located on that site such that the cumulative costs of repairs, reconstructio n, or improvements, over a five-year period equals or exceeds 50 percent of the fair market val ue of the property and the structures located on that property. The cost of repairs, reconstructi on, or improvements includes remodeling of existing building interiors, resurfacing of paved areas, and exterior building changes. The cost of repairs excludes ordinary maintenance activities th at do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution. Regulation: any regulation, rule, or requirement prepared by o r adopted by the City of Charleston, the State, and Federal regulatory agency(ies). Retention : the collection and storage of stormwater runoff w ithout subsequent discharge to surface waters. The collected water must be infiltrated into the soil, reused for beneficial purpose, and/or evaporated or evapotranspirated. Retention Structure: a permanent structure whose primary purpose is to permanently store a given volume of stormwater runoff. Release of the g iven volume is by infiltration, reuse, or evaporation/evapotranspiration. Retrofit : the process of altering an existing drainage syst em to function properly or more efficiently than currently exists. Sea Level Rise: an increase in sea level that is primarily related to climate change: added water from melting ice sheets and glaciers and the expansion of seawater as it warms. Global sea level has been increasing over the past century, and the rate has increased in recent decades. In 2014, global sea level was 2.6 inches above the 1993 aver age—the highest annual average in the City of Charleston Stormwater Design Standards Manu al Definitions xxiii satellite record (1993-present). Sea level continues to rise at a rate of about one-eighth of an inch per year Sediment : solid particulate matter, both mineral and organi c, that has been or is being transported by water, air, ice, or gravity from its site of origin. Sediment Control: the control of solid material, both mineral and organic, during a land disturbing activity to prevent its transport out of the disturbed area by means of air, water, gravity, or ice. Sedimentation : the process that operates at or near the surface of the ground, which deposits soils, debris, and other materials either on other ground surfaces or in the waterbody. Sedimentation Facility : any structure or area that is designed to retain suspended sediments from collected stormwater runoff, including sediment basins, and allows the sediment to settle out of the stormwater. Sensitive Waters: any waters with approved or established total maxi mum daily loads; any waters included in the most recent South Carolina D epartment of Health and Environmental Control Bureau of Water Clean Water Act Section 303 (d) list; or any waters pursuant to South Carolina’s Water Classifications & Standards (Regul ation 61-68) and Classified Waters (Regulation 61-69) regulations that are classified as either outstanding national resource waters, outstanding resource waters, trout waters, or shell fish harvesting waters; or in source water protection areas. Single-Family Residence (SFR)-Separately Built: a noncommercial dwelling that is occupied exclusively by one family and not part of a residential and subdivision development. Site : the land or water area where any development is physically located or conducted, including adjacent land used in connection with the development, and borrow and spoil locations associated with the development. Small Municipal Separate Storm Sewer (SMS4) : defined in South Carolina Regulation 61-9, Water Pollution Control Permits, Section 122.26(b)(16). Refers to all small separate storm sewer systems that are owned or operated by the United St ates, a State, city, town, borough, county, parish, district, association, or other public body (created by or pursuant to State law) having jurisdiction over disposal of sewage, industrial wa stes, stormwater, or other wastes, including special districts under State law such as a sewer district, flood control district, or drainage district, or similar entity, or an Indian tribe or an authorized Indian tribal organization, or a designated and approved management agency under Section 208 of the Clean Water Act that discharges to waters of the United States, but is not defined as “large” or “medium” municipal separate storm sewer system. This term includes systems similar to separate storm sewer systems in municipalities, such as systems at military bases, large hospital or prison complexes, and highways and other thoroughfares. The term does not include separate storm sewers in very discrete areas, such as individual buildings. City of Charleston Stormwater Design Standards Manu al Definitions xxiv Special Protection Area (SPA) or Stormwater Management Area : areas within the City of Charleston that require additional stormwater management controls due to existing concerns. Stabilization: the installation of vegetative or structural measu res to establish a soil cover to reduce soil erosion by stormwater runoff, wind, ice, and gravity. Storm Frequency : the probability of recurrence of a storm event. • Fifty Percent Exceedance Storm Event : a storm of specific intensity and duration that delivers rainfall with a 50% chance of being equale d or exceeded in any given year. This was formerly incorrectly referred to as a “2-yr storm” because the probability in any year of a storm of this rainfall duration and intensity was the same as the probability of 1 in 2. • Twenty Percent Exceedance Storm Event : a storm of specific intensity and duration that delivers rainfall with a 20% chance of being equale d or exceeded in any given year. This was formerly incorrectly referred to as a “5-yr storm” because the probability in any year of a storm of this rainfall duration and intensity was the same as the probability of 1 in 5. • Ten Percent Exceedance Storm Event : a storm of specific intensity and duration that delivers rainfall with a 10% chance of being equaled or exce eded in any given year. This was formerly incorrectly referred to as a “10-yr storm” because the probability in any year of a storm of this rainfall duration and intensity was the same as the probability of 1 in 10. • Four Percent Exceedance Storm Event : a storm of specific intensity and duration that delivers rainfall with a 4% chance of being equaled or exceeded in any given year. This was formerly incorrectly referred to as a “25-yr storm” because the probability in any year of a storm of this rainfall duration and intensity was the same as the probability of 1 in 25. • Two Percent Exceedance Storm Event : a storm of specific intensity and duration that delivers rainfall with a 2% chance of being equaled or excee ded in any given year. This was formerly incorrectly referred to as a “50-yr storm” because the probability in any year of a storm of this rainfall duration and intensity was the same as the probability of 1 in 50. • One Percent Exceedance Storm Event: a storm of specific intensity and duration that delivers rainfall with a 1% chance of being equaled or excee ded in any given year. This was formerly incorrectly referred to as a “100-yr storm” because the probability in any year of a storm of that rainfall duration and intensity was the same as the probability of 1 in 100. • Two Tenths Percent Exceedance Storm Event: a storm of specific intensity and duration that delivers rainfall with a 0.2% chance of being equaled or exceeded in any given year. This was formerly incorrectly referred to as a “500-yr s torm” because the probability in any year of a storm of that rainfall duration and intensity was the same as the probability of 1 in 500. Storm Surge : temporarily elevated shoreline stage and velocity as a result of atmospheric pressure changes and wind associated with a storm. Storm surge can be caused by storms a great distance away as well as closer to the location(s) where the storm surge is observed. Stormwater: runoff or excess water caused by precipitation. City of Charleston Stormwater Design Standards Manu al Definitions xxv Stormwater Management : • Quantitative control, a system of vegetative or st ructural measures, or both, that ensure no increase in volume and rate of stormwater runoff caused by man-made changes to the land • Qualitative control, a system of vegetative, struc tural, or other measures that reduce or eliminate pollutants that might otherwise be carried by stormwater runoff Stormwater Management and Sediment Control Plan: a set of drawings, other documents, and supporting calculations submitted as a prerequisite to obtaining a permit to undertake a land disturbing activity that contains all the informati on and specifications required by the City of Charleston. This plan is part of the Stormwater Pollution Prevention Plan. Stormwater Management Program: The City of Charleston’s Stormwater Management Program, which describes the components to be used by the City of Charleston to control stormwater discharges, address flooding, and meet water quality standards. Stormwater Management System(s) and Drainage Facili ty(ies): natural and man-made channels, swales, ditches, swamps, rivers, streams, creeks, branches, reservoirs, ponds, drainageways, inlets, catch basins, pipes, head wal ls, storm sewers, pumping and discharge facilities, lakes and other physical works, propert ies, and improvements that transfer, control, convey, or otherwise influence the movement of stor mwater runoff, be it for quantity or quality control. Stormwater Pollution Prevention Plan (SWPPP): a site-specific document that • Identifies potential sources of stormwater polluti on • Describes stormwater control measures to reduce or eliminate pollutants in stormwater discharges • Identifies procedures the operator shall implement to comply with the terms and conditions of a permit The Stormwater Pollution Prevention Plan includes s ite map(s), drawings and plans, other documents, and supporting calculations; identificat ion of activities that could cause pollutants in the stormwater; and description of measures or prac tices to control these pollutants. A Stormwater Pollution Prevention Plan may be prepared for construction sites, municipal facilities, or industrial facilities. Stormwater Runoff or Runoff: the direct response of a watershed to precipitation and includes the surface and subsurface runoff that enters a ditch, stream, storm sewer, or other concentrated flow during and following the precipitation. The part of rainfall that is not absorbed into the site but flows over the site as surface waters. Structure : anything constructed or erected, the use of which requires a location on the ground or attached to something having a location on the grou nd, for example, playgrounds, swimming pools, fences, and buildings. City of Charleston Stormwater Design Standards Manu al Definitions xxvi Subdivision : the division of a tract of land or of a parcel of land into two or more lots, building sites, or other divisions, for the purpose, whether immediate or future, of sale, legacy, or building developments, which includes any of the following: • Creation of a new city road or the alteration of a n existing road • Need for drainage, sedimentation, or flood control measures • Installation of a water delivery system • Installation of a sanitary sewerage system Subdivision shall not include the division of a tra ct of land wherein each lot created meets the standards of the City of Charleston Department of P ublic Service regarding the use of individual wells and septic tanks and does not involve any of the activities referenced above. When appropriate to the context, the term subdivision relates to the process of subdividing or to the land area subdivided. Submerged System: a system in which the permanent pool of water is above the flowline invert elevation of the outlet. Subsurface: relating to or situated in an area beneath a ground surface or body of water. Swale : a vegetated open channel for the purposes of conv eying stormwater with side slopes no steeper than 3H:1V. The cross-sectional shape may be triangular or trapezoidal. Tailwater: the water depth downstream of a hydraulic structur e or conveyance facility that restricts the flow of water from the structure or conveyance facility. Total Maximum Daily Load (TMDL): a calculation of the maximum amount of a specific pollutant that a waterbody can receive and still meet water quality standards. It is the sum of the allowable loads or allocations of a given pollutant from all contributing point and nonpoint sources. It also incorporates a margin of safety and consideration of seasonal variation. For impaired waters, the total maximum daily load document specifies the lev el of pollutant reductions needed for waterbody use attainment. Undeveloped Land: property not altered from its natural state by con struction or installation of improvements such as roads, drainage improvements, buildings, structures, or other impervious surfaces, or which has less than 20 percent of its property covered by impervious surfaces. Vegetation : all plant growth, especially trees, shrubs, mosses, and grasses. Violator: a person who violates any provision of Chapter 27 of the City of Charleston Ordinance, the Stormwater Management Program, the Stormwater Design Standards Manual, or any permit or authorization issued by the City of Charleston p ursuant to the ordinance, Stormwater Management Program, or Stormwater Design Standards Manual. City of Charleston Stormwater Design Standards Manu al Definitions xxvii Waiver: the relinquishment from certain erosion protection , sediment control, and stormwater management requirements by the Appropriate Plan App roval Authority for a specific land disturbing activity on a case-by-case review basis. Water Quality: characteristics of stormwater runoff or receiving waters that relate to the physical, chemical, biological, or radiological composition of water. Water Quantity: characteristics of stormwater runoff that relate to the rate, duration, and volume of the stormwater runoff. Watercourse : any natural or man-made conveyance used to transp ort runoff from one location to the next. Waters of South Carolina, or Waters of the State: defined as lakes, bays, sounds, ponds, impounding reservoirs, springs, wells, rivers, streams, creeks, estuaries, marshes, inlets, canals, the Atlantic Ocean within the territorial limits of the State, and all other bodies of surface or underground water, natural or artificial, public or private, inland or coastal, fresh or salt, which are wholly or partially within or bordering the State or within its jurisdiction and all waters of the United States within the political boundaries of the State of South Carolina. Waste treatment systems, including treatment ponds or lagoons designed to meet the requirements of Clean Water Act, are not waters of South Carolina. This exclusion applies only to man-made bodies of water that neither were originally created in waters of South Carolina (such as disposal areas in wetlands) nor resulted from the impoundment of waters of South Carolina. City of Charleston Stormwater Design Standards Manu al Definitions xxviii Waters of the United States: • All waters that are currently used, were used in t he past, or may be susceptible to use in interstate or foreign commerce, including all water s that are subject to the ebb and flow of the tide • All interstate waters, including interstate “wetla nds” • All other waters such as interstate lakes, rivers, streams (including intermittent streams), mudflats, sandflats, wetlands, sloughs, wet meadows , or natural ponds the use, degradation, or destruction of which would affect or could affec t interstate or foreign commerce including any such waters: o That are or could be used by interstate or foreign travelers for recreational or other purposes o From which fish or shellfish are or could be taken and sold in interstate or foreign commerce o That are used or could be used for industrial purp oses by industries in interstate commerce • All impoundments of waters otherwise defined as wa ters of South Carolina under this definition • Tributaries of waters identified in the preceding paragraphs of this definition • The territorial sea • Wetlands adjacent to waters (other than waters tha t are themselves wetlands) identified in the preceding paragraphs of this definition Watershed: the drainage area contributing stormwater runoff to a single point. In this document, the term Watershed is considered synonymous with Drainage Area . Wetlands : areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under norm al circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. Wetland a reas typically fall under the jurisdiction of one or both of the following agencies: South Caroli na Department of Health and Environmental Control Office of Ocean and Coastal Resource Management or the United States Army Corps of Engineers. City of Charleston Stormwater Design Standards Manu al Executive Summary xxix Executive Summary The objective of the City of Charleston Stormwater Design Standards Manual is to provide guidance on the design process during all phases of construction and the latest permanent construction stormwater management practices availa ble to minimize the negative impacts of increasing stormwater runoff and its associated pollutants. Building on the previous version, this updated manual will help the City of Charleston tak e a comprehensive approach to stormwater management that integrates drainage design, stormwa ter quantity, and water quality considerations. The goal is to provide an effective tool for the City of Charleston and the development community to reduce both stormwater qua lity and quantity impacts and ensure protection of both upstream and downstream areas as well as receiving waters. Stormwater management has entered a new era, the City of Charleston recognizes the need for more innovative policies and practices. The require ments for National Pollution Discharge Elimination System municipal and industrial permits , total maximum daily loads, and watershed assessments and the desire to protect human life, p roperty, aquatic habitats, and the quality of life in the City of Charleston have brought home th e pressing need to manage both stormwater quality and quantity from developed and developing areas. To enhance its utility and ease of use, this manual has been divided into eight chapters. Each chapter provides information that supports the impl ementation of an integrated, green infrastructure-based approach to natural resource protection, stormwater management, and site design that can be used to protect the City of Charleston’s and coastal South Carolina’s valuable natural resources from the negative impacts of land development and nonpoint source pollution. The eight chapters presented in the document include: • Chapter 1 – Introduction and Legal Authority: Chapter 1 provides an introduction of the Stormwater Design Standards Manual and summarizes t he legal authority the City of Charleston has been authorized to review and approv e stormwater construction permits through Federal, State, and local laws, regulations, and ordinances. • 0 – Conceptual Overview: 0 provides a conceptual overview of stormwater con cepts, water quality and quantity, management and planning, low impact development design, various types of development, best management practices, and sea level rise. • Chapter 3 – Design Requirements: Chapter 3 provides information necessary to develo p adequate systems that will control the rate, volume, and pollutants released from construction, development, and redevelopment projects. Chapter 3 also includes requirements for special protection areas, sea level rise, landscape design, and additional design considerations. • Chapter 4 – Construction Activity Permitting : Chapter 4 provides information on the permitting process prior to any land disturbing act ivity. The chapter includes roles and responsibilities, types of projects and permits required, approvals of applications, and changes made after project approval, fees, exemptions, and exceptions. • Chapter 5 – Construction Phase: Chapter 5 provides requirements during the land disturbing phase of the construction process. The chapter incl udes implementation of temporary best City of Charleston Stormwater Design Standards Manu al Executive Summary xxx management practices; requirements for changes to a pproved designs and approved stormwater pollution prevention plans, inspections by the construction applicant, owner, and/or operator during construction; and erosion prevention and sediment controls. • Chapter 6 – Post-Construction: Chapter 6 provides requirements for closeout opera tions during the post-construction phase. The chapter inc ludes information on final stabilization of the site, inspections, and in situ testing by the c onstruction applicant, owner, and/or operator, stormwater record drawings, city roadways inventory, final plats, stormwater GIS, maintenance plans and covenants, and stormwater facility warranties. • Chapter 7 – City Inspection and Enforcement: Chapter 7 provides requirements for inspections and enforcement actions conducted by th e City of Charleston. The inspection section of Chapter 7 includes duties and responsibi lities for the City of Charleston, inspector qualifications, associated fees, and inspection rep orts. The enforcement section of Chapter 7 includes information about common violations, corre ction orders, notices of violations, stop work orders, penalties, and uniform ordinance summo ns. • Chapter 8 – References: Chapter 8 lists all references in this manual. It includes references to laws, regulations, standards, ordinances, manuals, permits, studies, and websites. This manual is intended to provide guidance for the City of Charleston’s government officials and staff on implementing stormwater management program s. Developers planning land disturbing activities in the City of Charleston shall use this manual to find the minimum requirements needed throughout the design process from the beginning of the project to closeout. Other interested parties and the public may also find this manual helpful because it describes how managing stormwater improves water quality and quantity, helps protect the City of Charleston’s valuable natural resources, and contributes to othe r social and economic benefits. Adoption of new comprehensive management strategies using low i mpact development concepts, such as green infrastructure, will reduce the negative impa cts of stormwater runoff. These low impact development concepts help reduce runoff from new an d redevelopment sites by using best management practices that encourage infiltration, evaporation, capture, and reuse of stormwater runoff onsite. Chapter 1 Introduction and Legal Authority 1.1 Purpose Stormwater management is extremely important, particularly in coastal cities, such as the City of Charleston (City). With sea level rise, king tides, and the increase in population density, the City has and will continue to implement high standards w ith regard to public infrastructure, development, and redevelopment projects. The purpos e of the Stormwater Design Standards Manual (SWDSM) is to provide guidance on the design of the City’s stormwater system. The SWDSM addresses issues related to pre-construction and permitting, construction, and post- construction for public infrastructure, development , and redevelopment projects within the City. City of Charleston Stormwater Design Standards Manu al Introduction and Legal Authority 1-2 The SWDSM describes the policies and procedures that will be used by the City’s Department of Stormwater Management to implement the City’s ordinances related to stormwater. The SWDSM provides: • Application submittal requirements and approval pr ocess • Technical design standards, to include standards t hat address flow rates, runoff volume, and pollutant load/concentration, as well as standards applicable during construction, and post- construction performance • General information on measures to improve water q uality, prevent illicit discharges, and minimize stormwater runoff impacts due to construct ion activity, development, and redevelopment • Other protection provisions related to stormwater discharges such as wetlands and watercourse conservation 1.2 Scope The SWDSM is intended to be a resource for City off icials, staff, designers, and developers on the stormwater design requirements approved by the City’s Department of Stormwater Management. Additionally, the SWDSM provides inform ation to the interested citizen regarding the City’s approach to stormwater management. 1.3 Legal Authority Federal regulatory agencies delegate authority to t he States, providing that State requirements meet or exceed Federal requirements. The United States Environmental Protection Agency (EPA) delegates authority for the Clean Water Act (CWA) a nd other environmental laws to the State of South Carolina. In turn, the South Carolina Departm ent of Health and Environmental Control (SCDHEC) is the regulating and permitting agency fo r the State. SCDHEC has the ability to delegate authority to local stormwater management programs, if local programs meet or exceed Federal and State requirements. The City has combin ed Federal, State, and local laws, regulations, and ordinances for stormwater into the SWDSM. The SWDSM incorporates design standards that are re quired by the regulatory agencies. The City requires any construction activity to incorpor ate the standards stated in the SWDSM, or enforcement and corrective actions will be taken. T he City strictly adheres to the SWDSM, and will require the same from any parties designing and engaging in construction activities, in order to improve flood control, water quality, and infrastructure integrity. 1.4 Authorization The SWDSM has been prepared under the direction of the Department of Stormwater Management, which has been granted the authority by the City Council to develop engineering design standards and enact programs and policies to ensure compliance with State and Federal City of Charleston Stormwater Design Standards Manu al Introduction and Legal Authority 1-3 laws for the purposes previously described. A detai led description of the laws, regulations, and assigned authorizations to the City is provided in the following section. 1.5 Stormwater-Related Laws, Regulations, and Permi ts Any construction activity is required by law to reg ulate water quality and quantity to protect the waters of the State and waters of the United States . Federal laws and regulations provide the overarching guidelines for the United States. South Carolina laws include Federal laws and require other regulations specific to the State. Th is section contains the Federal and State laws, regulations, and permits that are included and required by the City of Charleston Ordinance and are encompassed in the SWDSM ( Figure 1-1). Figure 1-1. Hierarchy of laws and regulations from Federal to local governments 1.5.1 Federal Clean Water Laws 1.5.1.1 Clean Water Act The Federal Water Pollution Control Act, as amended by the CWA, requires the reduction of water pollution and gives EPA the congressional authority to develop programs to improve the health of navigable waters. EPA developed regulations that created a program of discharge permits as part of the National Pollutant Discharge Elimination Sys tem (NPDES) to regulate point sources from a variety of discharges. The 1987 amendments to the CWA extended NPDES permits to industrial discharges, including stormwater runoff associated with land disturbing activity. The 1987 CWA Amendments also require NPDES permitting for stormw ater runoff from urbanized areas. A Municipal Separate Storm Sewer System (MS4) NPDES permit is required based on population. Authority to administer the NPDES permit program wa s delegated to State agencies, such as SCDHEC, by EPA. City of Charleston Stormwater Design Standards Manual Code of the City of Charleston, South Carolina (City Ordinances) South Carolina Permits South Carolina Laws and Regulations Federal Permits Federal Laws and Regulations City of Charleston Stormwater Design Standards Manu al Introduction and Legal Authority 1-4 1.5.1.2 Federal Coastal Zone Management Act of 1972 The United States Congress recognized the fragile b alance between economic growth and preservation of the environment and passed the Coastal Zone Management Act (CZMA) in 1972. The goal of CZMA is to “preserve, protect, develop, and where possible, to restore or enhance the resources of the nation’s coastal zone.” CZMA i s administered by the National Oceanic and Atmospheric Administration (NOAA) and provides for the management of the nation’s coastal resources. Coordination between Federal and State j urisdictions is a requirement and allows flexibility for local programs to address their specific needs. 1.5.2 Required Federal Permits 1.5.2.1 United States Army Corps of Engineers Secti on 404 Permit Under the CWA Section 404(b)(1) Guidelines, EPA est ablished regulations and guidelines for discharges of dredged or fill materials into the wa ters of the United States, including wetlands. The United States Army Corps of Engineers (USACE) is charged with evaluating applications of the Section 404 Permit under a public interest revi ew, CWA, and additional regulations promulgated by EPA. The basis of the Section 404 Permit is to show that steps have been taken to avoid discharges of dredged or fill material int o waters of the United States, potential impacts have been minimized, and compensation will be provided for all remaining unavoidable impacts. Activities requiring a Section 404 Permit include, but are not limited to, fill for development, water resources projects (e.g., dams and levees), infrast ructure development (e.g., highways and airports), and mining activities. 1.5.3 South Carolina Water Laws 1.5.3.1 South Carolina Pollution Control Act The South Carolina Pollution Control Act was origin ally enacted in 1950 and was last amended in 1970 during the initial stages of the environmen tal movement. It was broadly written and is applicable to essentially any activity that could n egatively impact the environment by requiring attainment of a permit and implementation of measures to mitigate potential negative impacts. 1.5.3.2 South Carolina Stormwater Management and Se diment Reduction Act The South Carolina Stormwater Management and Sedime nt Reduction Act of 1991 (SMSRA) (Section 48-14-10 et seq.) was enacted to address t he increase in stormwater runoff rate and quantity, the decrease of rainwater infiltration, a nd the increase in erosion associated with the extensive urban development occurring throughout th e State. SMSRA gave legislative authority to SCDHEC to enact programs to meet its purpose. City of Charleston Stormwater Design Standards Manu al Introduction and Legal Authority 1-5 1.5.3.3 South Carolina Coastal Zone Management Act CZMA provides grants to States that develop and imp lement Federally approved coastal zone management plans. The Office of Ocean and Coastal Resource Management (OCRM), a division of SCDHEC, implements this management plan for the State’s eight coastal counties as established by the Coastal Zone Management Act of 1976. Within the coastal zone, the program provides authority to review any project requiring a State permit (certification), a Federal permit or license (including NPDES), Federal funding, and direct Federal activities to determine whether the project is consistent with the policies and pro cedures of the South Carolina Coastal Zone Management Program. 1.5.3.4 South Carolina Stormwater-Related Regulatio ns South Carolina became the permitting authority over the NPDES Stormwater Program through SMSRA in 1991. SCDHEC has the responsibility of enforcing the stormwater regulations. These regulations provide information about stormwater standards and the regulatory process. Below is a list of regulations from SCDHEC: • South Carolina Regulation 61-9, Water Pollution Co ntrol Permits • South Carolina Regulation 61-68, Water Classificat ions & Standards • South Carolina Regulation 61-69, Classified Waters • South Carolina Regulation 61-110, Total Maximum Da ily Loads (TMDLs) for Pollutants in Water • South Carolina Regulation 72-101 through 72-108, E rosion and Sediment Reduction and Stormwater Management • South Carolina Regulation 72-300 through 72-316, S tandards for Stormwater Management and Sediment Reduction • South Carolina Regulation 70-405 through 72-445, S tandards for Stormwater Management and Sediment Reduction 1.5.4 Required South Carolina Permits 1.5.4.1 Ocean and Coastal Resource Management Coast al Zone Consistency Under the guidelines of CZMA and the South Carolina Coastal Tidelands and Wetlands Act of 1977, the South Carolina Coastal Management Program was established to manage coastal resources. Under the program, a Coastal Zone Consis tency (CZC) Certification is required for any land disturbing activities in the coastal count ies, including Charleston County and Berkeley County, prior to receiving coverage under the NPDES Permit Program. All CZC Certifications are granted through the OCRM in SCDHEC. CZC Certification guarantees a balance of environmental protection and economic and social improvements of the coastal zone. A CZC Certification must be obtained prior to applying for any Federal or State permit. City of Charleston Stormwater Design Standards Manu al Introduction and Legal Authority 1-6 1.5.4.2 NPDES General Permit for Stormwater Dischar ges from Regulated Small Municipal Separate Storm Sewer Systems (Permi t No. SCR030000) The City is required to have a NPDES permit to disc harge stormwater from MS4, officially titled the “State of South Carolina NPDES General Permit for Storm Water Discharges from Regulated Small Municipal Separate Storm Sewer Systems (SMS4) .” Since land disturbing activities contribute to the discharge of pollutants, the NPDE S permit requires that the City encourage, promote, and implement practices, programs, and pro cedures for reducing or limiting discharge of pollutants into receiving waters of the State. T he permit requires that the City develop and implement a Stormwater Management Program (SWMP) to control the discharge of pollutants from its MS4 to the maximum extent practicable. The location of the NPDES General Permit can be found in Appendix A. 1.5.4.3 NPDES General Permit for Stormwater Dischar ges Associated with Industrial Activities (Permit No. SCR000000) Stormwater runoff from “industrial activities” is considered an illegal discharge without a NPDES discharge permit. The permit is titled “NPDES Gener al Permit for Storm Water Discharges Associated with Industrial Activities (Except Const ruction),” and is informally known as the Industrial General Permit (IGP). These permits requ ire certain industries to develop and implement a Stormwater Pollution Prevention Plan (S WPPP), which must include appropriate best management practices (BMPs) to minimize pollut ion to receiving waters. The two general types of industrial activity permits are construction related and other. Coverage under the NPDES General Permit for Stormwater Discharges from Construction Activities is required for construction sites that disturb 0.5 acre or more. Coverage is required for construction activities within 0.5 mile of a receiving water. The requirements for obtainin g and complying with this type of permit are the focus of the SWDSM. The location of the NPDES IGP can be found in Appendix A. 1.5.4.4 NPDES General Permit for Stormwater Dischar ges from Construction Activities (Permit No. SCR100000) Stormwater runoff from construction activities is considered an illegal discharge without a NPDES discharge permit. The NPDES General Permit for Stor mwater Discharges from Construction Activities, also known as a Construction General Permit (CGP), addresses discharges during and post-construction activities. Requirements for discharges during construction activities set forth in the permit are based on the CWA, 33 U.S.C. 1251 et seq. and the South Carolina Pollution Control Act , Section 48-1-10 et seq. Additional requirements are established in South Carolina Regulation 61-9, Water Pollution Control Permits, S outh Carolina Regulation 72-300, SMSRA, and coastal zone citation. EPA has delegated the authority to implement the CGP to SCDHEC within the State of South Carolina. Any land disturbing activities (e.g., clearing, grading, or excavating) are required to obtain cove rage for stormwater discharges under the NPDES CGP. The location of the NPDES CGP can be found in Appendix A. City of Charleston Stormwater Design Standards Manu al Introduction and Legal Authority 1-7 1.6 Section 303(d) Listed Waters and Total Maximum Daily Loads Through the provision of Section 303(d) of the CWA, EPA requires States to submit a list of all waterbodies (Section 303(d) Listed Waters) that do not meet minimum water quality standards every two years. The Section 303(d) list allows wat er quality impairments to be identified and corrective actions to be implemented. Once on the Section 303(d) List, a TMDL for the waterbody must be developed within 2 to 13 years of the initi al listing by the State. SCDHEC develops the TMDL and forwards the information to the EPA Region 4 office for final approval. 1.7 City of Charleston Ordinances, Regulations, and Standards 1.7.1 Qualifying Local Program EPA gives authority of NPDES permitting agencies SCDHEC to recognize when a local sediment and erosion control program meets or exceeds the requirements of the stormwater regulation 40 CFR 122.44(s). SCDHEC has the authority to incorpor ate the local program by reference in its permit for construction activities. The local program is then known as a Qualifying Local Program (QLP). The advantages of a QLP include streamlining the permit process and providing one set of requirements for construction activities. QLPs a llow municipalities to modify stormwater programs to meet local needs as long as the requirements are met on a State and Federal level. QLPs undertake the responsibility of reviewing and approving erosion and sediment control plans, inspecting sites to ensure compliance, and taking corrective actions when needed to protect water quality. The City has promulgated and adopted ordinances and standards based on State and Federal regulations to address concerns associated with uncontrolled stormwater runoff. City ordinances and standards that may affect construction activities, and the development and redevelopment of land, include the following: • Building • Design, Development, and Preservation • Floodplain • Stormwater Management Ordinances • Utilities • Zoning • Other ordinances and standards may also be applica ble and should be consulted as necessary. 1.7.2 1984 Master Drainage Plan The Master Drainage and Floodplain Management Plan for City of Charleston, South Carolina (1984 Master Drainage Plan) was the first phase of a four-phase plan to improve the existing stormwater facilities in the City (Davis and Floyd, Inc. 1984). The plan was submitted in City of Charleston Stormwater Design Standards Manu al Introduction and Legal Authority 1-8 compliance with the agreement between the City and the Engineers and constituted the completion of the first phase of identifying the existing drainage problems and recommendations for improvement. The Master Drainage Plan included all areas within the 1984 City boundaries. 1.7.3 Level of Service for Maintenance Level of Service (LOS) is a set of standards and se rvices the community can expect from the stormwater management program. The citizens of the City are ensured consistent and reasonable standards of service through paying the monthly stormwater fee. The City maintains the MS4 and certifies the system is serviceable and has minimal negative impact on the receiving waters in order to comply with the requirements set forth by SCDHEC. The LOS and fee can only be applied within the City boundaries and MS4 jurisdiction. 1.8 Easements An easement is a “right of use for access granted o n, above, under, or across a tract of land by the landowner to another person or entity” (Section 54-1051(k) Ordinance No. 2018-031 § 11, 4- 10-18). Specifically, a drainage easement is the “r ight of access of stormwater runoff from adjacent drainage basins into the drainageway within the defined easement” (Section 54-1051(i) Ordinance No. 2018-031 § 11, 4-10-18). Easements are permanent and exist even after transfer of ownership of property. The City uses easements f or maintenance and repairs of stormwater infrastructure and other utilities within the easem ent. The location of the easement agreement, known as a Covenants for Permanent Maintenance of S tormwater Facilities (CPMSF), is in Appendix B. 1.9 Standards Superseded When the SCDHEC or the City updates design standards associated with stormwater discharges, the City provides notification of the new design st andards and the cancellation of current design standards via the City’s website. The City also provides a timeline when the new design standards will be implemented. 1.10 Other Standards Sought The City requires the most restrictive standard as the driver of design standards: Whenever the provisions of this article impose more restrictive standards than are required in or under any other law, regulation, or article, the requirements contained in this article shall prevail. Whenever t he provisions of any other law, regulation, or ordinance require more restrictive standards than are required in this article, the requirements of such law, regulation, or ordinance shall prevail. (Ord inance No. 2007-158 § 2, 8-21-07) City of Charleston Stormwater Design Standards Manu al Introduction and Legal Authority 1-9 1.11 Duty to Comply Unless otherwise allowed by the City of Charleston Ordinance or the SWDSM, the surface of land in the City shall not be disturbed or altered for a ny purpose whatsoever, nor any major drainage channel or component of the stormwater system imped ed or encroached upon without approval from the Department of Stormwater Management. Const ruction, development, and redevelopment activities shall not begin prior to a pproval from the Department of Stormwater Management and other City Departments as necessary. 1.12 Engineering Design Accountability The SWDSM will assist engineers, plan reviewers, inspectors, and contractors in the design and layout of most land disturbance projects. The user of the SWDSM is hereby cautioned that many aspects of engineering design must be considered, including but not limited to: • Public health, safety, and welfare • Site-specific conditions or unusual features of a project site that warrant special designs • Current versions of design texts, manuals, technic al documents, and research The design engineer must have sufficient education and experience to perform a complete and thorough design of each element shown on the construction plans and must also have complete control to change or alter the plans during the design phase. The design engineer shall thoroughly investigate field conditions and coordinate design efforts with the City. Construction plans, site plans, details, calculations, construction specific ations, and other technical documents must be designed, stamped, and sealed by a Professi onal Engineer or Tier B Land Surveyor actively licensed in the State of South Ca rolina , unless otherwise stated in the SWDSM. The SWDSM is not intended to restrain or inhibit engineering creativity, freedom of design, or the need for engineering judgment. When shown to be applicable, design engineers are encouraged to submit new procedures, techniques, and innovativ e stormwater BMPs with supporting documentation. However, the use of such approaches shall be substantiated with submitted documentation by design engineers showing that the proposed design is equal to or exceeds the traditional procedures in terms of performance and economic feasibility. 1.13 Severability It is the declared intent of the City that, if any portion of the SWDSM is ruled to be invalid or unconstitutional by any court with adequate jurisdi ction over the City, then such portion shall be considered to have been selectively removed from th e SWDSM without affecting the overall applicability, validity, or enforceability of any r emaining provisions, and it is the intent of the Ci ty that such remaining provisions shall continue in full force and effect. City of Charleston Stormwater Design Standards Manu al Introduction and Legal Authority 1-10 1.14 Language and Interpretation of Text The following language rules are applicable to the SWDSM: • The imperative words “ shall ” and “ must ” indicate mandatory actions. These actions must be performed unless sufficient engineering justificati on is submitted to the City’s Department of Stormwater Management and written approval has been specifically granted. • The word “ should ” indicates an action that is highly recommended un der most conditions. • The word “ may ” indicates an allowable action or choice that is usually beneficial in meeting the minimum City requirements. • Use of the singular or plural case of a noun shall not affect the applicability of the SWDSM, or any other law, regulation, or ordinance, unless the context of the sentence specifically indicates that the singular/plural case affects the intended use or function on a scientific or engineering basis. The use of a singular or plural noun does no t necessarily indicate whether to design or construct a single unit or multiple units. • Any reference to the Department of Stormwater Mana gement shall mean the duly authorized representatives, sections, or employees under the D irector’s supervision who have delegated responsibilities. Areas of delegated responsibility may include, but are not limited to, review and approval of plans, review and approval of surve y plats, interpretation of standards or requirements, approval of special conditions, revie w and issuance of approvals, inspections and field investigations, enforcement actions, issu ing notices of violation, conducting public meetings, etc. • The use of “ and ” shall imply conjunction of items in lists of required elements, in which all items must be complied with. • The use of “ or ” shall imply the disconnection of items in lists o f required elements, in which either or one or the other items in the list must be complied with. • The rules of verbal construction found in the City of Charleston Ordinance also apply to the SWDSM. 1.15 Disclaimer The SWDSM is not intended as a textbook or as a comprehensive engineering design reference. It was developed under the assumption that the user possesses a thorough understanding of stormwater control design, construction, and land d evelopment. Guidance documents from Federal, State, and local agencies as well as other relevant references are referenced throughout the SWDSM and are only for the purposes of providing additional information. See Chapter 8 for a complete list of references. City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-1 Chapter 2 Conceptual Overview 2.1 Introduction This chapter provides a conceptual overview of stor mwater, the site conditions that dictate stormwater runoff quantity and quality, and the imp acts that urban development have on stormwater. The topics introduced throughout this c hapter are intended to establish a baseline understanding of stormwater concepts for developers, engineers, and any other members of the public who have an interest in the many factors tha t impact stormwater management in the Charleston area. Later chapters go more in depth in to the stormwater considerations that factor into design, permitting, and construction. 2.2 Stormwater and Watersheds The City has many water resources that we all enjoy . This chapter describes how proper stormwater management can protect and preserve thes e water resources for generations to come. 2.2.1 Introduction to Stormwater During a storm, rainfall can either be intercepted by plants and trees or fall on the land. In a natural condition, the land absorbs the majority of rainfal l by a process called infiltration. As the land is developed and becomes urbanized, more of the landsc ape is covered by impervious surfaces, such as rooftops, pavement, and compacted soil. As shown on Figure 2-1 , an increasing percentage of impervious surface results in less rainfall being infiltrated into the soil, and more of the rainfall running off. These hard surfaces gener ate a larger volume of stormwater runoff, and without the natural obstacles that would otherwise slow the water down, the runoff travels at a faster rate. Fast-moving, large volumes of water ca use erosion and flooding, and can damage land and property downstream. Additionally, as the runoff travels over the land, it picks up pollutants. Pollutants are any substance or material not naturally present in rainwater or surface water, or a natural substance that is present in excessive quantities (such as sediment). Impaired waters cannot be used as intended, for recreation, water supply, fishing or shellfishing, etc., due to pollution, or may lose their ability to support aquatic life. City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-2 Source: City of Charleston 2009 Figure 2-1. Diagram depicting changes in runoff and infiltration with increasing amounts of impervious surface The basis for stormwater design in the City is the storm annual exceedance probability (AEP) percentage, or the percent chance that a 24-hour ra in event will occur in any year, for the area. For example, a 1 percent AEP storm event in Charleston will result in 10.3 inches of precipitation over a 24-hour period. The AEP is determined using historical rainfall data within a region. AEP is used as opposed to recurrence intervals to avoid the public incorrectly interpreting that an X- year storm event only happens once in every X-years . Table 2-1 shows the equivalents for the most commonly used storm recurrence intervals and AEPs. Table 2-1. Recurrence interval compared to annual e xceedance probability 2.2.2 What is a Watershed? A watershed is an area of land that drains to a sin gle point, bounded by higher elevations at the edges. Within a watershed, water travels over land until it reaches a body of water, and as the Recurrence Interval (years) Annual Exceedance Probability (percent) 2 50 5 20 10 10 25 4 50 2 100 1 500 0.2 1000 0.1 City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-3 water passes farther downstream, draining a larger area, pollutants can accumulate. Ultimately, the rivers and streams reach the ocean, and any accumulated pollutants are discharged into the ocean. In coastal areas, wetlands border the land, and many of the local streams and creeks enter wetlands before discharging to the ocean. Wet lands perform a crucial function in the watershed, intercepting pollutants carried downstre am and removing them from the water in a natural treatment process. Additionally, wetlands slow the water down, allowing some of the runoff to infiltrate or be stored in the wetlands and slow ly released long after the storm has passed. Figure 2-2 depicts how wetlands work. Source: City of Charleston 2016 Figure 2-2. Diagram depicting role of wetlands in a watershed 2.2.3 Changes from Natural Conditions to Developmen t Land development is the process of converting natural landscapes, such as forests, swamps, and grasslands, to developed, urban, or residential are as. This process typically begins with site clearing, which is the removal of trees, shrubs, an d other vegetation. The landscape is then graded using a combination of cut and fill of the existing soil surface to provide clear, level building sites. In place of the previously vegetated land, d eveloped impervious areas such as buildings, roads, and parking lots are constructed. By altering the landscape from a natural to a developed condition, the hydrology of the site is also changed. The natural drainage pathways that dominate the undisturbed stormwater system are replaced with a system of gutters, pipes, and channels designed to efficiently move water offsite. City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-4 Due to the continued increase in the stringency of stormwater management regulations, as outlined in Chapter 1 , the inclusion of vegetated land and natural drain age pathways in site development designs has become more common. By including natural systems into their designs, developers can help offset the impact of urbanization on the stormwater system. 2.2.4 Effects of Development Development and redevelopment of urban and resident ial areas are an essential and dynamic part of any vibrant community, and are particularly important to consider in Charleston as economic and population growth remain anticipated. Given that development will continue for the foreseeable future, the key is to consider the impacts that development will have on the landscape and receiving waterbodies. Chapter 3 through Chapter 6 of this document outline the design, permitting, and construction standards that should be implemented to ensure that stormwater management is a major consideration in development going forward. Changing a landscape from a natural condition to a developed condition also alters the hydrology of the site. By compacting the soil, installing roa ds, and constructing buildings, the overall impervious area of a site is dramatically increased . The reduction in evapotranspiration and infiltration, increase in impervious area, and trad itional stormwater management principle of moving stormwater runoff offsite as fast as possibl e often lead to increased stream flow downstream of a development. This increased stream flow offsite can be seen in the increased runoff volume, peak runoff discharges, and runoff velocities. The high runoff rates and decreased infiltration rates caused by development also lead to decreases in groundwater recharge rate, which reduces the base flow in streams. Urbanization also leads to significant changes in t he geometry of streams in a watershed. Traditionally, farmers and developers would straigh ten stream channels to reduce the area covered by a meandering stream channel and to incre ase the speed at which stormwater flows offsite. Additionally, the increase in runoff volum e and velocity offsite increases the amount of channel forming bankfull and near bankfull events. Bankfull events are the flow condition where the highest stresses are applied to streambanks, ca using streambank erosion and channel enlargement. Figure 2-3 shows a typical stream progression as a watershed is developed. Source: ARC 2016. Figure 2-3. Changes to a stream’s geometry due to w atershed development Direct and indirect changes to the landscape follow ing development have an impact on the aquatic habitats of these ecosystems. The increase in channel-forming bankfull events causes increased streambank erosion rates that undercut and uproot riparian vegetation. The streambed City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-5 is scoured away as a result of more intense storm e vents that mobilize the native bed material downstream. In addition to the loss of valuable habitat along the streambank and bed, increased erosion causes higher sediment loads to downstream aquatic ecosystems. The additional sediment load often accumulates in downstream strea m reaches and wetlands, degrading their aquatic habitat value. In wetlands, the higher runoff rates and volumes resulting from development cause greater fluctuations in water levels. Water l evels fluctuating from extreme high levels to extreme low levels can stress wetland ecosystems, c ausing a decline in aquatic plants and wildlife. Stormwater runoff from developed areas also has a higher temperature than runoff from natural landscapes. Aquatic organisms are typically sensitive to water temperatures, so the addition of warmer water from runoff can have a harmful effect on habitat diversity. Stormwater runoff due to development also increases the pollutant loads associated with runoff, degrading the water quality in aquatic resources. A s stormwater runoff flows over developed areas, hydrocarbons from oil and gasoline, heavy me tals, pesticides, and other pollutants are picked up and transported to receiving waters. Sediment contaminated by oil spills, pesticides, or construction operations also may discharge into rec eiving waters as a result of surface erosion from runoff. Green spaces (e.g., parks, recreationa l fields, gardens) in urbanized areas can be over fertilized or fertilized immediately prior to a rain event. The excess fertilizer is transported in stormwater runoff to bodies of water, increasing nutrient loads. The added nutrient load causes a rapid increase in the algal growth, which in turn i ncreases nutrient competition for other organisms. In extreme cases, the increased algal growth can lead to algal blooms that can harm other plants, animals, and humans and lead to no ox ygen being present in the water when the sun goes down. The increased stormwater runoff rates caused by dev elopment may also result in property damage and public safety concerns. Surface erosion around building foundations, scour around roadways, and streambank loss due to erosion are po tential sources of property damage and safety concerns due to the increased stormwater run off in developed areas. Additionally, algal blooms caused by increased nutrient loads in waterways can cause human health hazards. Surface runoff over roadways and parking lots often picks up and deposits loose trash and debris into rivers, ponds, and lakes. The discharge of tra sh into waterways and degradation of natural ecosystems contribute to a loss in the aesthetic va lue of the areas surrounding developments. The decline in wildlife abundance and diversity res ulting from the loss and degradation of terrestrial and aquatic ecosystems also reduces the recreational value of these areas. 2.3 Introduction to Soils Soils provide nutrients for plant growth, filtratio n of pollutants, and storage or release of stormwater. The soil characteristics at a site should be considered when designing a development or redevelopment. Soil characteristics often dictat e which practices are necessary for the management of stormwater during and after construct ion. Site factors that impact stormwater drainage include soil texture, soil permeability, v egetation, topography, groundwater levels, and climate. Based on these soil characteristics, one of four hydrologic soil groups (HSGs) are used to classify the infiltration rates of different soi l units: Group A, Group B, Group C, and Group D. City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-6 Additionally, characteristics such as the pH and or ganic content of soil influence the type of vegetation that can thrive at a site. The growth of vegetation on a site can help to stabilize the soil, improve infiltration, and promote pollutant removal from stormwater. Soils are generally made up of four main components : mineral elements, pore space, organic matter, and living organisms. Soil texture is determined by the concentration of the three sizes of mineral elements found in soil. From smallest to la rgest, these particles are clay, silt, and sand. Soils with a higher concentration of sand are consi dered coarse textured and tend to be well draining, have low nutrient content, and are highly erodible. A higher concentration of clay will result in fine-textured soils that have reduced air and water movement, tend to shrink and swell, and become slippery when saturated ( Figure 2-4). Source: RainMachine 2019. Figure 2-4. Soil mineral sizes Soil permeability is the measure of the ability of fluids to pass through soil. Permeability is determined based on a combination of soil texture, structure, and density. Soils with very low permeability have dense, clayey mineral elements re stricting the movement of air and water between pores. Highly permeable soils have loose, s andy minerals allowing fluids to easily infiltrate into pore spaces. In terms of stormwater management, this characteristic is one of the main factors in determining how quickly an area will drain following a storm event. The ability, or in some cases inability, of water to infiltrate through soil may determine the design requirements for a development’s stormwater management. City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-7 While soil texture and permeability are important t o site stormwater infiltration, many other site conditions and soil characteristics influence the o verall drainage of a particular soil unit. To simplify the determination of soil infiltration rat es, the Natural Resources Conservation Service (NRCS) classifies soils as one of four HSGs ( Table 2-2). Group A is characterized by low runoff potential, high infiltration rates even when wetted, and large amounts of sand and gravel. Group B soils have moderate infiltration rates when wette d and are composed of fine to moderately coarse sand. Soils in Group C have low infiltration rates when wetted, have a layer that impedes the infiltration of water, and are composed of fine-textured soils. Group D soils have a high runoff potential, have low infiltration rates, and consist of clay soils with a permanent high water table or shallow soils over nearly impervious material. The infiltration rates for all the HSGs are reduced when the soil is saturated due to large storm events. Table 2-2. Characteristics of NRCS Hydrologic Soil Group Classifications The characteristics influencing the HSGs are often site-specific; however, the addition of vegetation to a site design can stabilize the soil, improve infiltration, and promote pollutant removal from stormwater. Soil characteristics such as pH and organic content influence the ability of vegetation to grow in soil. Topsoil and compost can be added to the upper layer of the existing soil onsite to provide the nutrients and chemical composition for vegetation to establish. 2.4 Water Quality The potential impacts to water quality should be co nsidered when designing developments and redevelopments. Stormwater pollutants most often co me from nonpoint sources and are an indirect impact of land development. As stormwater runoff washes over streets and parking lots, garbage, vehicle-related chemicals, pesticides, and other debris are picked up and discharged into ditches and receiving waterbodies. Common pollutants associated with land development are provided in Table 2-3 and include suspended solids, oxygen demanding matter and bacteria, and nutrients. High levels of these pollutants in storm water runoff can lead to multiple issues for receiving waterbodies, including reduced dissolved oxygen (DO) levels; increased algal growth, which may lead to eutrophication; and habitat degradation. Soil Group Description Runoff Potential Infiltration Rate A Deep sandy soils Very low High B Shallow sandy soils over low permeability layer Low Low C Sandy soil with high clay or mineral content Medium to high Low D Clayey soils Very high Low to none City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-8 Table 2-3. Typical stormwater pollutants and source s Pollutant Source Pollutants of Concern Erosion Sediments and attached soil nutrients, orga nic matter, and other adsorbed pollutants. Atmospheric Deposition Hydrocarbons emitted from au tomobiles, dust, metals, nutrients, and other chemicals released from industrial and commercial activities. Roadways/Transportation Related Areas Hydrocarbons emitted from automobiles, dust, and metals. Construction Sites Sediment, metals, paint, and woo d preservatives. Manufactured Products (Industrial Land Uses) Heavy metals, phenols, and oils from automobiles, and zinc and cadmium from tire wear. Lawn and Landscape Maintenance Fertilizer and pesti cides. Plants and Animals Plant debris, grass clippings, a nd animal excrement. Septic Tanks Coliform bacteria, nitrogen, and nitra te. Non-Stormwater Connections Sanitary sewage, industrial wastewater, commercial discharge, swimming pool discharge, and water line flushing. rAccidental Spills Pollutants of concern depend on the nature of the spill. Animal Waste Management Coliform bacteria, nitrates , and phosphorus. Pesticide Applications Pollutants of concern depend on the pesticide being used and the type of crop or pest being treated. Agricultural Land Disturbance Sediment and attached soil nutrients, organic matter, and other adsorbed pollutants. Fertilizer Applications Nitrogen and phosphorus. 2.4.1 Suspended Solids The most prevalent form of stormwater pollution is the presence of suspended matter that is either eroded by stormwater or washed off paved surfaces b y stormwater. Sediment is derived from a variety of sources, including erosion from disturbed areas and washoff of sediment deposited on impervious areas. Several models are available to p redict total suspended solids (TSS) contributions from “clean” sediment, but few of the models have parameters specific to urbanized areas. Models that have capabilities that have been used for predicting urban clean sediment include Stormwater Management Model (SWMM), Sedimen t Erosion Discharge Program (SEDPRO), Soil and Water Assessment Tool (SWAT), an d Sediment Erosion Discharge by Computer Aided Design (SEDCAD) models. For the mode ls to be effective in sizing BMPs, predictions should be made of time varying quantiti es as well as the size distribution. Those distributions should be of the aggregated particles, not just the primary particles. City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-9 2.4.2 Oxygen Demanding Matter and Bacteria Sufficient levels of DO in the water column are nec essary to maintain aquatic life, growth, and reproductive activity, as well as to maintain aerob ic conditions. The introduction of stormwater containing oxygen-demanding organic matter can impair the receiving water quality by reducing the DO levels, such that it is unable to sustain certain forms of aquatic life and can further cause the water to become foul. Bacteria enters the stormwater drainage system typi cally from the washoff of animal feces and organic matter from the catchment’s surface, through leaking sewer systems (lateral connections, manholes, and industrial or commercial drains, etc.), and malfunctioning septic systems. Leaking sewer systems and malfunctioning septic systems are considered illicit discharges and illegal by the City of Charleston Ordinance, and are discussed more in Section Illicit Discharge Detection and Elimination 2.4.4 . Pathogenic bacteria and viruses in stormwater dis charges pose human health threats. The removal of pathogenic bacteria is achieved primarily through the process of biological decay and physical-chemical disinfection where practiced. The reduction of bacteria in waters of the State has been the focus of TMDL efforts by SCHDEC to date. 2.4.3 Nutrients Nitrogen and phosphorus are nutrients that promote the growth of plants and Protista, such as algae, and are the second leading stressor of impaired rivers and streams and the leading stressor of impaired lakes (USEPA 1997). Such nutrients contribute to the eutrophication of waterbodies, resulting in associated liabilities such as decreased oxygen supply, alteration of aquatic life, and decreased recreational value (Novotny et al. 1985). Nutrients are typically derived from agricultural runoff and runoff from chemicals applied to lawns in urbanized areas, runoff from industrial sites, m unicipal wastewaters (of more concern for combined sewer overflows), or dry fall onto impervi ous surfaces that are later washed into stormwater. Nutrients can be removed from stormwate r prior to discharge through biological uptake, such as by plantings in BMPs. Models of nutrient loading in urban runoff are typically based on washoff type calculations or user- defined loadings and concentrations, all of which r equire user-defined constants. BMPs treat nutrient-rich runoff through settling (particulates), adsorption (to clay particles), uptake (by plants), and denitrification (nitrogen only). 2.4.4 Illicit Discharge Detection and Elimination An illicit discharge is any discharge to the City’s stormwater system that is not composed entirely of stormwater. There are a variety of illicit disch arge sources, including those depicted in Table 2-4. It is important for property owners to know and u nderstand these sources so that they may help to reduce or mitigate their impact on the pollutant load of the stormwater system. City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-10 Table 2-4. Typical illicit discharge sources The City’s Small MS4 General Permit requires the im plementation of a program to detect and eliminate illicit discharges. The City is responsib le for field screening to identify potential illici t discharges and their source, and the subsequent enf orcement and elimination of the illicit discharge source. This procedure is essential to the reduction in point source pollution in the City’s waterways (USEPA 2005 and USEPA 2010). 2.5 Water Quantity Often, the first consideration when designing a new development or redevelopment is water quantity. The addition of impervious surfaces and r emoval of vegetation when developing a previously natural landscape disrupts the hydrologi c cycle and leads to increases in stormwater runoff peak flows and total runoff volume. Changes in water quantity can be readily visible to property owners when flood frequency, severity, and duration increase. In coastal areas, factors such as changing tides, low depths to the groundwat er table, and a generally flat terrain can exacerbate the impact that development has on flooding ( Figure 2-5). Land Use Source Activity Residential • Apartments • Single family homes • Car washing • Driveway cleaning • Chemical dumping/spills • Septic system maintenance • Landscaping • Swimming pool discharges Commercial • Car dealers • Car washes • Laundry facilities • Auto repair shops • Gas stations • Restaurants • Swimming pools • Building maintenance (power washing) • Chemical dumping/spills • Landscaping • Outdoor material storage • Vehicle fueling • Vehicle washing • Washout of grease traps Industrial • Recycling centers • Distribution centers • Food processing • Construction vehicle washouts • Garbage truck washouts • Marinas • Chemical storage facilities • Industrial process water or rinse water • Loading and unloading area washout • Outdoor material storage • Vehicle washing • Vehicle fueling • Building maintenance • Landscaping Municipal • Airports • Landfills • Maintenance facilities • Fleet storage • Public works facilities • City buildings • Building maintenance • Chemical dumping/spills • Landscaping • Outdoor material storage • Road and parking lot maintenance • Vehicle fueling • Vehicle maintenance/repair • Vehicle washing City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-11 Source: U.S. EPA CADDIS Vol. 2 Figure 2-5. Stormwater flow changes associated with urbanization Five types of flooding occur in the Charleston area, as discussed in the following sections. 2.5.1 Coastal and Tidal Flooding In areas along the coastline, factors including hig h tide, storm surge, and tailwater contribute to the risk of coastal flooding. High tide flooding, also referred to as sunny day flooding or nuisance flooding, occurs during higher than average high tide conditions in low-lying areas along the coast (NOAA 2018 and NOAA 2019). These higher than averag e high tide conditions are also called spring tides or king tides. High tide flooding may lead to more frequent road closures, overwhelmed storm drains, or deterioration of storm water infrastructure. In some areas, land subsidence, or the sinking of land over time, has l ed to an increased frequency of high tide flooding. Another condition impacting coastal flooding is storm surge. Storm surge is the rising of coastal water levels as a result of strong winds an d changing atmospheric pressure during hurricanes and tropical storms. Higher high tides a nd land subsidence can also lead to tailwater issues for stormwater drainage systems. Tailwater occurs when the water surface elevation of a receiving waterbody is higher than the discharge po int of a stormwater system. When at this condition, there is not enough energy for the storm water to be discharged out of the system, causing the stormwater system to become overloaded. Figure 2-6 depicts this type of flooding. City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-12 Source: Ben Gilliland and Natural Environment Research Council (NERC) Figure 2-6. Coastal flooding causes and impacts 2.5.2 Extreme Event (Flash) Flooding Floods that develop within six hours of their immediate cause are considered to be extreme event floods. Extreme event floods are typically associated with mountainous regions where stormwater flows rush down mountainsides and overwhelm downstr eam communities. However, extreme event floods can occur in coastal areas under certain conditions, including intense rainfall during king tides; high-intensity rainfalls inland of a co astal community that drain toward the coast, leading to inundation of coastal river systems; and high-intensity rainfalls that occur in areas that are already partially inundated by previous storm events. Figure 2-7 depicts this type of flooding. City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-13 Source: Ben Gilliland and NERC Figure 2-7. Extreme event flood causes and impacts 2.5.3 Fluvial (Riverine) Flooding Another flooding risk experienced in coastal regions is fluvial flooding. This type of flooding occurs when water levels in stream channels rise and overt op the streambanks, causing water to flow into the floodplain. In natural landscapes, this pr ocess is an integral part of a stream ecosystem that reduces stress on the channel during high flow s and helps add nutrients to the stream that boost the aquatic habitat. In developed landscapes, riverine flooding can cause damage to buildings, roadways, and other infrastructure that have been built too close to the stream. The frequency of fluvial flooding is often increased in developed, coastal areas due to multiple factors, including impervious area that increases stormwater runoff volume and intensity; persistent, intense rain events; and debris or log jams causing blockages in the stream channel. The National Weather Service classifies fluvial floods as minor, moderate, or major based on the projected water surface elevation and impacts along the river. Minor floods occur in low-lying areas adjacent to streams found in rural areas and secondary roads. Moderate flooding is characterized by water levels high enough to impact homes, businesses, and larger roads. This level of flood event may require evacuations for residents in the impacted a reas. Major floods cause extensive flooding that may flood major traffic routes and isolate som e neighborhoods. These events require evacuations of numerous homes to protect citizens from injury. City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-14 2.5.4 Groundwater Flooding In pervious landscapes, the higher intensity and du ration of storm events along the coast can cause groundwater recharge to occur faster than groundwater discharge. This leads to the water table rising and saturating subsurface soil layers, resulting in groundwater flooding. During this condition, previously permeable soil layers are no longer able to allow stormwater to infiltrate, causing ponding along the soil surface. Figure 2-8 depicts this type of flooding. Source: Ben Gilliland and NERC Figure 2-8. Groundwater flooding causes and impacts 2.5.5 Surface Flooding A common misconception is that flooding can only oc cur near bodies of water. Surface flooding occurs when the excessive stormwater flows from int ense or extended rain events cause the ground to become saturated. This type of flooding is observed as standing water in grassed and impervious areas resulting from stormwater flows th at saturate the soil and overwhelm the stormwater drainage system. Surface flooding does n ot typically have a significant flood depth but can cause property damage when combined with other sources of flooding. Figure 2-9 depicts this type of flooding. City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-15 Source: Ben Gilliland and NERC Figure 2-9. Surface flooding causes and impacts 2.6 Principles of Floodplain Management Floodplain management is a community program of pre ventive and corrective measures implemented to reduce the risk of current and futur e flooding. The main goals of floodplain management are to promote the natural functions of the floodplain, where practical, and mitigate damages to structures in Federal Emergency Manageme nt Agency (FEMA) designated Special Flood Hazard Areas (SFHAs) from natural flooding ev ents. Promoting the functions of the floodplain improves natural flood storage and erosi on control, water quality maintenance, groundwater recharge, and biological productivity. In the City, these goals are achieved by promoting and managing multiple programs, including: • FEMA requirements and recommendations • National Flood Insurance Program requirements and recommendations • Expanded participation in the Community Rating Sys tem • Flood Insurance Rate Map information • Filing of elevation certificates for structures in the SFHA City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-16 2.7 Master Planning for Stormwater Implementing stormwater considerations into a city master plan is integral to improving the effectiveness and longevity of a stormwater system. Stormwater master plans typically outline the characteristics of the watershed, define the existi ng stormwater system, and make recommendations on how to improve the stormwater in frastructure within the city. Key concepts to ensure a stormwater master plan’s success include: • Adopting a long-term approach to planning. Communi ties can provide a plan for implementation that allows for the integration of s elected projects within other community development plans, such as capital improvement. • Managing stormwater close to where precipitation f alls. Encourage features such as wetlands and riparian buffers to control stormwater runoff volumes and rates. • Implementing innovative technologies, or green inf rastructure, to site designs. This can generate benefits ranging from improved water quality to cost savings for community amenities. • Use of requirements set forth by the CWA and the C ity’s Phase II MS4 Permit. Considering these requirements at the front end of the planning process helps to ensure that stormwater regulations are easily attainable long-term. The City has developed multiple stormwater master p lans including the 1984 Master Drainage Plan, the Dupont-Wappoo Watershed Master Plan (City of Charleston 2019a), and the City of Charleston Church Creek Watershed Storm Water Master Plan (Woolpert, LLP 2001). The 1984 Master Drainage Plan is intended to improve stormwater drainage throughout the City municipal area. The Dupont-Wappoo and Church Creek Master Pla ns are specifically aimed at mitigating the stormwater drainage issues within the Dupont-Wappoo and Church Creek watersheds in West Ashley. Each master plan is divided into phases to ensure their effective implementation. These sequential phases include: • Assess the current conditions of the stormwater dr ainage system. • Make recommendations for drainage improvements. • Secure funds for the construction of recommended i mprovements. • Design and construct recommended improvements. These Master Plans can be accessed online through the City’s Department of Stormwater Management website ( https://www.charleston-sc.gov/2144/Stormwater-Management ). 2.8 Principles of Stormwater Management At its core, the goal of stormwater management is t o prevent flows associated with rain events from negatively impacting human health and safety. Traditional stormwater management was solely focused on controlling water quantity. Stormwater systems were composed mainly of pipes designed to convey runoff directly to downstream aquatic resources. Over time, the water quality impacts of stormwater have become a much greater co nsideration, which is reflected in the City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-17 regulations, municipal codes, and permits that driv e the stormwater management of new developments and redevelopments. However, managing stormwater quality and quantity is the goal of stormwater management. 2.8.1 Introduction to Stormwater Management Construction, development, and redevelopment have t he potential to alter the natural drainage patterns, flow rates, and volumes of water in the e nvironment. Construction, development, and redevelopment can directly or indirectly change the physical, chemical, and biological conditions of natural waterways. When land is developed or red eveloped, the natural hydrology of the watershed is disrupted and traditionally stormwater systems that have facilitated the efficient removal of not just runoff but associated pollutant s into receiving waters is impacted. Clearing land removes vegetation that intercepts and slows r ainfall runoff. Grading removes the benefits of topsoil, compacts the subsoil, and fills in depressions that provide natural storage. As a result of land development and redevelopment, infiltration is decreased and rainfall that once seeped into the ground runs off the surface at an accelerated rate. 2.8.2 Innovative Design In recent times, the innovative design of new developments has helped to address the impacts of stormwater quantity and quality. The goal of innova tive design is to reduce runoff, reduce the amount of pollutants carried offsite by runoff, and capture and treat runoff onsite. The amount of pervious area onsite can be maximized by preserving the amount of open spaces and functional landscapes, which reduces the impact new development and redevelopment has on stormwater runoff. BMPs are used to enhance open spaces and ca pture and treat stormwater runoff onsite. Source control provides added pollutant reduction b y preventing pollutants from ever being exposed to stormwater. 2.8.3 Site Planning The first step in addressing stormwater management begins in the site planning and design stage of the construction, development, and redevelopment project. By implementing BMPs during the site planning process, the amount of runoff and pollutants generated from a site can be reduced by minimizing the amount of impervious area and usi ng natural onsite treatments. Design engineers should consider using BMPs and site planning to minimize adverse stormwater runoff. The reduction of runoff volumes and stormwater poll utants decreases the number and size of stormwater management controls that must be implemented under the guidelines set forth in this SWDSM. BMPs reduce the amount of post-construction, post-development, and post- redevelopment impervious areas and maintain natural characteristics of the pre-construction and pre-development site conditions. Therefore, the pos t-construction, post-development, and post- redevelopment curve number and time of concentrations are maintained more closely to the pre- construction and pre-development conditions. This r educes the overall hydrologic and hydraulic impact of the construction, development, and redevelopment. City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-18 2.8.3.1 Maintaining Site Resources and Natural Undi sturbed Areas Conservation of site resources and natural, undistu rbed areas helps to reduce the post- construction, post-development, and redevelopment runoff volume and provides areas for natural stormwater management. Natural site resources that should be maintained include, but are not limited to: • Natural drainageways • Vegetated buffer areas along natural waterways • Floodplains • Areas of undisturbed vegetation • Low areas within the site terrain • Natural forested infiltration areas • Wetlands 2.8.3.2 Lower Impact Site Layout Techniques Lower impact site layout techniques involve identif ying and analyzing the location and configuration of structures on the site to be constructed, developed, or redeveloped ( Figure 2-10 ). Where applicable, the following options that create lower impact layouts should be used: • Fit the design layout to follow the natural contou rs of the site to minimize clearing and grading and preserve natural drainageways and patterns. • Limit the amount of clearing and grading by identi fying the smallest possible area on the site that would require land disturbance. • Place construction activities, development, and re development areas on the least sensitive areas of the site and avoid steep-sloped areas when possible. • Use nontraditional designs to reduce the overall i mperviousness of the site by providing more undisturbed open space and minimizing clear-cutting. • Consider using cisterns and rain barrels to collec t stormwater for reuse. • Consider the use of energy dissipation devices, su ch as level spreaders, at discharge points. Such devices should also be considered for discharg e points into ponds and other basin-type BMPs. City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-19 Source: Ellis et al. 2014. Figure 2-10. Conventional parking lot layout vs. pa rking lot layout using low impact development techniques 2.8.3.3 Minimization of Impervious Cover The minimization of total impervious area directly relates to a reduction in stormwater runoff volume and associated pollutants from a construction, development, and redevelopment site. The amount of impervious cover on a site can be reduced by the following techniques where applicable: • Reduce building footprints by constructing some bu ildings as multi-story. • Reduce parking lot areas and use porous/pervious p avement surfaces for overflow parking. • Increase the amount of vegetated parking lot “isla nds” that can also be used for stormwater management practices such as bioretention areas. • Disconnect impervious surfaces by directing runoff to adjacent pervious areas so that runoff can be filtered and infiltrated. 2.8.3.4 Use of Natural Features for Stormwater Mana gement Structural stormwater drainage controls are traditi onally designed to remove stormwater runoff quickly from the site without utilizing any of the natural storage areas. These natural drainage areas should be considered as potential stormwater drainage systems. The natural areas can be used in the following ways where applicable: • Vegetated buffers and undisturbed areas on the sit e are useful to control sheet flow (not concentrated flows) by providing infiltration, runoff velocity reduction, and pollutant removal. • Natural drainageways (e.g., streams, lakes, rivers , wetlands, and swamps) should be maintained to provide a natural stormwater drainage system to carry runoff to an existing outlet. The use of natural drainageways can allow for stora ge of stormwater runoff, lower peak flow rates, reduction in erosive runoff velocities, and capture and treatment of pollutants. City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-20 • The use of vegetated swales instead of curb and gu tter applications allows for more storage of stormwater runoff, lower peak flow rates, reduction in erosive runoff velocities, and capture and treatment of pollutants. • Rooftop runoff should be directed to pervious natu ral areas for water quality treatment and infiltration instead of connecting rooftop drains t o roadways and other structural stormwater conveyance systems. 2.8.3.5 Engineered/Proprietary Devices The City is aware of the potential benefit in using a number of stormwater engineered devices currently available on the market, such as baffle boxes, cartridge filters, and sock and tube erosion control devices. The City will evaluate all such de vices specified for a project and require drawings, specifications, and discussions as to the applicability of the product, expected performance, and required maintenance to be submitt ed. The City reserves the right to require that certain devices be installed or certain devices be prevented from use. 2.8.3.6 Green Infrastructure Engineered stormwater infrastructure can be designe d to mimic natural systems, and on many sites can supplement or replace conventional engine ered systems, such as storm sewers and detention ponds. This type of “living infrastructure” or “green stormwater infrastructure” can range from small scale rain gardens and bioretention basi ns to large scale constructed stormwater wetlands (See Section 3.12 ). Generally, these design elements rely on fine gr ading, plant materials, and engineered outflow structures to mim ic wetland hydrology and thereby to control and improve both the quantity and quality of stormwater runoff. 2.9 Types of Development Urban development is categorized as new development , redevelopment, or brownfield development. The design requirements for stormwater management in each category are different to ensure that negative impacts are minim ized. In general, new development requirements are aimed at minimizing the amount of impervious area in the design, whereas redevelopment requirements are aimed at reducing the amount of impervious area on the existing site. Brownfields may have unique requirements rega rding the co-mingling of surface and groundwater based on the individual site’s contamination history. 2.9.1 New Development New development includes land-disturbing activities, structural development, and the creation of impervious surfaces on land that was previously pr edominantly pervious with minimal building and roadway footprints. The transition from native landscapes to a developed condition reduces the infiltration, evapotranspiration, and surface r oughness onsite, regardless of the amount of green space and BMPs implemented into the site design. This results in a significant increase in the site stormwater runoff volume and rate, which o ften impacts areas downstream of the development. The stormwater management portion of a new development’s design is typically City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-21 based on location-specific storm event probabilitie s of exceedance (50 percent, 10 percent, 1 percent, etc.), soil characteristics, and water quantity and quality requirements. 2.9.2 Redevelopment Redevelopment includes land-disturbing activities, structural development, installation of impervious surfaces, and replacement of impervious surfaces on a previously developed site. Activities such as exterior remodeling or routine m aintenance are not typically considered to be redevelopment. The change in impervious area, and t he associated stormwater impacts, for redevelopment activities are typically less signifi cant than for new development. The standards for redevelopment design are typically based on the reduction of stormwater runoff rate, runoff volume, amount of impervious area, and pollutant load. In some cases, there may be exceptions to the need for reduction of these factors if the initial developed condition was within the required standards. 2.9.3 Brownfields Redevelopment of brownfields provides a unique opportunity to mitigate pollutants. EPA defines brownfields as a property in which expansion, redev elopment, or reuse may be complicated by the presence or potential presence of hazardous substances, pollutants, or other contamination. In preparing these landscapes for redevelopment, th e contaminated soils are often capped to prevent their exposure to stormwater runoff generated onsite, which creates additional impervious area (USEPA 2008). Challenges associated with the m anagement of stormwater on brownfield sites include: • Capping contaminated soils while mitigating the ne gative impact the impervious surfaces have on downstream waterways • Implementing practices designed to increase infilt ration, which may inadvertently mobilize pollutant loads in the soil and discharge them into groundwater and nearby surface water • Installing green infrastructure practices that can retain, treat, and release stormwater without coming in contact with contaminated soils • Considering how the location of the site within th e watershed may impact areas downstream and groundwater 2.10 Introduction to Permanent Best Management Prac tices BMPs are practices that are implemented in the design of developments to prevent or reduce the pollutant load carried offsite by stormwater runoff. Typically, multiple BMPs are implemented at a site to meet pollutant and runoff discharge require ments. Permanent BMPs can be placed into two main categories, structural and non-structural. Structural BMPs are features that must be constructed to mitigate the runoff rate, runoff volume, and pollutant load offsite. These structures are designed to capture and treat stormwater runoff onsite, and include practices such as rain gardens, filter strips, pervious pavement, extended detention ponds, and wetlands. Non-structural BMPs focus on source reduction to reduce the amount of stormwater runoff and pollution City of Charleston Stormwater Design Standards Manu al Conceptual Overview 2-22 generated onsite. Implementing features into site d esign such as minimizing the total disturbed area, protecting existing wetlands and natural flow pathways, and directing rooftop runoff to vegetated areas can help to reduce the stormwater r unoff generated by a development. Non- structural BMPs can also be behavioral practices that reduce pollutant loads at the source, such as routinely sweeping streets and sidewalks to keep impervious surfaces clean, encouraging homeowners to clean up pet waste, and handling and storage of chemicals. 2.11 Sea Level Rise Over the past 100 years, the sea level in the City has risen slightly more than 1 foot. Climate experts have projected that sea levels will continue to rise at an increasing rate over the next 100 years. Being a coastal city with elevations near se a level, the City already experiences tidal flooding of streets during spring tides (“minor coa stal flooding”) and due to storm surge. The marked increase in observed and predicted “minor coastal flooding” is shown in Figure 2-11 . Figure 2-11. Observed and Predicted “Minor Coastal Flooding” In Charleston To begin planning for continued sea level rise, the City released an update to the S ea Level Rise Strategy in February 2019, which provides a framework to im prove the City’s resilience to sea level rise. The five critical components of the Sea Level Rise Strategy are: 1. Resources – sufficient funding and proper staffing to meet th e City’s immediate and long-term goals under the Sea Level Rise Strategy 2. Governance – establish policies and regulations aimed at prot ecting public and private investments 3. Infrastructure – identifying innovative solutions and prioritizing projects to protect the most critical and vulnerable areas affected by the rising sea levels and more extreme wet-weather events. 4. Land Use – effective land use planning can maximize value an d minimize risk from potential influences to strengthen community resilience by directing growth to where it makes the most sense over the long term in lower risk areas, and seek to adapt and retreat in higher risk areas. 5. Outreach – educating the public about the threat of floodin g and sea level rise, its causes, and what can be done to protect the City. City of Charleston Stormwater Design Standards Manu al Conceptual Overview 3-23 Information about the Sea Level Rise Strategy can be found on the City’s website at: https://www .charleston-sc.gov/1981/Flooding-Sea-Level-Rise-Strategy Chapter 3 Design Requirements 3.1 Introduction This chapter provides engineers, designers, developers, and others with the information needed to develop adequate stormwater management approache s and systems that will manage the stormwater rate, volume, and pollutants released fr om new development, and redevelopment projects. These design requirements have been devel oped based on common engineering practices and references to State and Federal requirements, engineering publications, and other municipal and academic guidance. A goal of this chapter is to provide a minimum set of design standards that will result in effective stormwater management to mitigate the impact of lan d development on existing/natural hydrologic and hydraulic processes, as well as attempt to prevent further degradation of the water resources in the City through proper planning, design, installation, and maintenance. All land shall be developed in a manner consistent with City Ordin ances and the SWDSM. Specific methods and applications not covered in the SWDSM can and s hould be discussed with the Department of Stormwater Management for applicability. The following sections detail the criteria that shall be followed in the absence of specific watershed master plan criteria. 3.2 Determination of Construction Activity A party wanting to construct, develop, or redevelop in the City limits is subject to the Stormwater Design Standards requirements as determined by the application type. The application types determine the construction activity and design parameters. Specifics can be found in Section 4.5 . 3.3 Design Approach Proper planning is necessary to ensure that stormwa ter management is considered and fully integrated at the various stages of construction, development, and redevelopment. This involves a comprehensive approach to site planning and a tho rough understanding of the physical characteristics and resources associated with the project site. This planning includes addressing each of the following categories: • Stormwater quantity controls • Erosion prevention and sediment controls • Stormwater quality controls • Stormwater conveyance controls • Maintenance schedules for temporary and permanent stormwater BMPs City of Charleston Stormwater Design Standards Manu al Design Requirements 3-2 The design of successful stormwater management plan s involves adhering to the following principles, where applicable: • Pre-submittal site meeting/site visit • Review of site development requirements • Detailed site analysis and supporting calculations • Creation of a Stormwater Concept Plan • Design aspects of the stormwater management plans • Completion and approval of the construction activi ty application When designing for land disturbing activities, the design should address the following three categories of control: (1) water quantity (flood co ntrol), (2) erosion prevention and sediment control (EPSC), and (3) pollution control (permanen t water quality standards). If an innovative stormwater design approach is to be used, the desig n engineer shall take the following considerations in mind, in addition to meeting the above listed three categories of control: • Stormwater quantity and quality are best controlle d at the source of the problem by reducing the potential maximum volume of runoff and pollutan ts. Source control will typically be more economical in order to treat the first flush of a storm event. • Implement stormwater management by using simple st ructural and non-structural methods which are reasonably maintained. • Equaling or exceeding traditional stormwater manag ement designs in terms of performance (rate/volume attenuation, pollutant removal) and ec onomic feasibility (long-term) are essential to a proposed concept’s eventual approval. Innovative approaches to site design often focus on source control for stormwater runoff that limit the amount of runoff generated and incorporate perm anent BMPs throughout the site. These types of design concepts are described in detail in several sources, including Georgia Stormwater Management Manual, Volume 1: Policy Guidebook (ARC 2016); Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014); and Green Infrastructure Design Manual – Green Management Practices and Design Strategies to Manage Stormwater in Our Community Chapter 18 (Louisville and Jefferson County MSD 2011). General requirements for all stormwater systems and facilities shall include, but may not be limited to, the following: • Site designs shall minimize the stormwater runoff from the site and maximize pervious areas by: o Selecting portions of the site where the drainage pattern, topography, and soils are favorable for the intended use. o Exposing the smallest practical area of land for t he least possible time during construction, development, and redevelopment. This includes maintaining or creating buffers and preserving natural areas. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-3 o Limiting the drainage area to all BMPs and install ing BMPs as soon as practical in the development process. o Retaining and protecting natural vegetation and sa ving topsoil for replacement on graded areas. o Using temporary plant cover, mulching, hydroseedin g, or BMPs to control runoff and protect areas subject to erosion during and after construction. o Maintaining pre-development infiltration rates thr ough soil amendments/treatments for post-development pervious areas. • One of the goals of the City’s stormwater program is to comply with the water quality requirements in the Phase II MS4 permit, which requ ires 80 percent TSS removal in the stormwater runoff by using permanent structural BMP s. The following four tiers (described in Section 3.9.2 ) are considered by the City to be equivalent and c omply with the MS4 permit, though the water quality volumes for each differ. T he permittee must choose which tier, or combination of tiers in the case of multiple subwatersheds, they will implement on their project. The four tiers are as follows: o Green Infrastructure o Green Infrastructure with an Underdrain o Detention Practices o Pass-through Devices that provide the requisite wa ter quality treatment through physical/mechanical, chemical, or biological processes 3.4 Stormwater Hydrology and Routing This section discusses the hydrologic criteria that a designer should use when designing stormwater infrastructure on their projects. In addition, this section presents stormwater collection and conveyance design criteria and design criteria for roadway drainage. 3.4.1 Introduction to Hydrologic Requirements Hydrologic computations shall be completed using vo lume/peak/duration-based hydrograph methods acceptable to the Department of Stormwater Management. The design storm duration for these computations shall be the 24-hour storm e vent based on a NRCS Type III distribution with a 0.1-hour duration time increment and a 484 p eaking factor. The applicant may propose a lower peaking factor by providing justification in the Engineering Report narrative, which may include, but is not limited to, an associated Zonin g classification and/or impervious area determination. Typical hydrologic inputs include, but are not limited to, the following: • Rainfall depth or intensity • NRCS soil classification and hydrologic soil group • Land use • Time of concentration • Initial abstraction (surface storage and/or vegeta tive capture). City of Charleston Stormwater Design Standards Manu al Design Requirements 3-4 All modeling results must be presented to the hundredth place. The remainder of this section provides basic information for the hydrologic calculations. The intent of the SWDSM is not to provide detail on every aspe ct of hydrologic computations, their limitations, assumptions, or appropriateness of use , but rather to present general guidance on commonly accepted standards. 3.4.2 Rainfall and Design Storms The 24-hour duration precipitation depths corresponding to various probabilities for exceedance in any given year are shown in Table 3-1 and are to be used for projects within the City. T hese values contain a 10 percent safety factor to accoun t for uncertainties in the design process and the increasing intensities of storms. Table 3-1. 24-hour design storm precipitation data for Charleston, South Carolina Rainfall intensities must be pulled from the most recent NOAA Atlas Point Precipitation Frequency Estimates Map for the specific site area and a 10 p ercent safety factor must be applied to each value. 3.4.3 Reservoir Routing Controls shall be designed by a traditional reservoir routing procedure. 3.4.4 Recommended Methods and Design Procedures 3.4.4.1 Stormwater Computation Methodologies The City recommended methods and corresponding design circumstances are listed in Table 3-2 and Table 3-3. If other methods are used, approval shall first be obtained from the Department of Stormwater Management. Complete source documentation shall be submitted for review. Table 3-2. Recommended methodologies based on land disturbance area Method Size Limitations a Comments (Modified) Rational Method 0 – 2 acres Acceptable for sizing individual culverts or storm drains that are not part of a pipe network or system. Not to be used for storage design. Probability Exceedance 100% 50% 20% 10% 4% 2% 1% Return Frequency (Year) 1 2 5 10 25 50 100 Precipitation (inches) 3.8 4.6 6.1 7.2 8.7 9.9 11.3 City of Charleston Stormwater Design Standards Manu al Design Requirements 3-5 Method Size Limitations a Comments NRCS Method (TR-55) 0 – 2,000 acres Used for estimating peak flows from urban areas. aSize limitations refer to the subwatershed size to the p oint where a stormwater system component (i.e., culvert, inlet, BMP) is located. Table 3-3. Recommended hydrologic methods for desig ning various stormwater management systems and controls Details of the Rational Method and Modified Rationa l Method can be found in Chow, Maidment, and Mays (1988), American Society of Civil Engineer s (ASCE) (1996), US Department of Agriculture (USDA) (1986, 2004), and Mays (2001). Documentation on the commonly used NRCS Method can be found on the USDA website: https://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb1044171.pdf . The United States Geological Survey (USGS) regressi on equations for South Carolina can be obtained from the USGS website: https://water.usgs.gov/software/NFF/manual/sc/ . Haan, Barfield, and Hayes (1995) and USDOT (1996, 2 001b) can also be referenced for more detail on hydrology calculations and assumptions. 3.4.4.2 Computer Modeling Methodologies Designers may select an appropriate modeling progra m to calculate the pre-development and post-development site conditions. In circumstances where backwater, tailwater, and tidal conditions are not present, and for storm drainage systems with less than five connections, programs using Manning’s equation will be considered satisfactory. However, if these conditions are present, programs that incorporate Saint-Venant equations shall be selected to better Method Rational Method NRCS Method Large Watersheds + Storage/Sedimentation Facilities + Outlet Structures + Gutter Flow and Inlets + + Storm Drain Pipes + + Culverts + + Small Ditches + + Open Channels + Energy Dissipation + City of Charleston Stormwater Design Standards Manu al Design Requirements 3-6 represent the hydrodynamic environment. The selecte d program and its associated computational methodologies and inputs shall be listed in the Engineering Report narrative. 3.4.5 Time of Concentration Time of concentration (T c) is the time for runoff to travel from the most hydraulically remote point of the watershed to a point of interest. Methods fo r calculating the time of concentration and abstraction are numerous. The most common method to calculate time of concentration for surface flow is using the USDA TR-55 methodology (U SDA 1986), which divides time of concentration into Three components: (1) sheet flow , (2) shallow concentrated flow, and (3) open/closed channel flow. For the purposes of calcu lating time of concentration in the City, the maximum sheet flow length shall be 100 feet, and ma ximum shallow concentrated flow length shall be 1,200 feet. From there, it is considered open/closed channel flow until the ultimate outlet. Each component has a travel time (T t) associated with it, and will be added together to become the time of concentration. A minimum time of concen tration of 6 minutes shall be used for all hydrologic calculations. Hydrographs shall be used to evaluate entire system s by routing storm events through pipe or storage systems. The use of a hydrograph will provi de better insight into system performance than simply using the peak discharge. The City will accept commonly used computer models. Other models may be accepted with appropriate documentation. 3.4.6 Collection and Conveyance Requirements This section provides the design requirements for v arious stormwater drainage and collection system components, including design storms, velocities, and pipe and inlet sizes. Storm drainage systems shall include all storm drainage structures and pipes that convey runoff under roadways. The standards in the following sections are required for all publicly maintained drainage systems and are recommended for privately maintained systems. When a project is solely for drainage infrastructur e improvements, and not associated with a development, these standards should be achieved to the Maximum Extent Practicable (MEP) within the constraints of the project. For projects that propose to complete drainage improvements to support an associated development, then these standards shall be met. Note that the design storm for all public infrastru cture is the 4 percent 24-hour storm event probability unless stated otherwise. 3.4.6.1 Storm Drain Pipes 1. The minimum size storm drainage pipe allowable in t he right-of-way shall be 15 inches in nominal inner diameter. The minimum size pipe allowable out side the right-of-way shall be 12 inches in diameter. 2. The minimum slope for storm drainage pipe shall be three tenths of 1 percent [0.003 ft/ft] where possible. The minimum pipe flow velocity shall be 2 fps; A technical procedure document on computer modeling for velocity computations has bee n provided in this manual, but if a five tenths City of Charleston Stormwater Design Standards Manu al Design Requirements 3-7 of 1 percent [0.005 ft/ft] pipe slope or greater ca n be provided then no additional velocity computations are required. Pipes that have the pur pose of equalization between two or more ponds do not have to meet this requirement. Maximum allowable flow velocity shall be 10 fps under any flow condition. 3. Drainage system installation shall be such that sto rmwater discharge is not concentrated on adjacent property and that the velocity is less tha n erosive limits for the site soils. At pipe outfal ls, this normally requires the use of a riprap apron pl aced on filter fabric, turf reinforcement mats, or articulating concrete mat for a minimum distance eq ual to or greater than six pipe diameters. To use an alternative measure, the design engineer sha ll submit supporting documentation that the proposed measure shall perform at least equivalent to the currently approved erosion prevention measures approved and contained in this SWDSM. 4. Equalization Pipes and Submerged Systems (Section 3.11 ) shall require a design exception (Section 4.10 ) due to the significant nature of maintenance on s uch conveyances. Equalization pipes between ponds may be submerged if isolator boxes are installed at both ends of the conduit to facilitate draining for maintenance purposes. Th e maximum distance between isolator boxes shall be 600 feet. The minimum pipe size for equalization pipes is 24 inches in diameter. For submerged conveyances, the design exception req uest shall address pretreatment for sediment, demonstrate construction methodology to r eplace system (including dewatering and excavation without the need for shoring), and provi de for a methodology for cleaning of the submerged pipes such as isolator boxes. 5. Type and class of storm drainage pipe and the installation of pip es shall be in accordance with Sections 714 (Permanent Pipe Culverts) and 715 (Tem porary Pipe and Pipe Arch) of the latest South Carolina Department of Transportation (SCDOT) specifications. The use of any storm drain pipe other than reinforced concrete pipe (RCP) shall require approval in writing by the Department of Stormwater Management. 6. All pipes and boxes (catch basins, drop inlets, man holes, junction boxes, etc.) shall have stone bedding made of 4 inches and 6 inches, respectively, of #57 stone. Backfill shall consist of suitable material and compaction requirements per the latest SCDOT specifications. Alternative pipe bedding shall be considered when supported by the s ite-specific geotechnical report. 7. A minimum of 1 foot of cover shall be provided for storm drainage pipes unless otherwise granted by the Department of Stormwater Management. RCP Cla ss IV or V pipe may be requested by the Department of Stormwater Management in special conditions (deep installation, excessive surface loads, etc.). 8. Storm drainage pipe shall be placed to minimize the length running under pavement. Where it is necessary for pipe to cross the roadway, it prefera bly shall be placed at a 90-degree angle and in no case at less than 45 degrees. All cross lines in the roadway shall have backfill compacted in 6- inch lifts to 95 percent Modified Proctor Compacti on Test maximum density and to 98 percent Modified Proctor Compaction Test on the last 6 inches. 9. Any "open" storm drainage cross line pipe shall extend beyond the toe of the roadway embankment. In no case shall the end of the pipe be within the 5-foot roadway shoulder . 10. Storm drainage pipe discharging into a drainage channel shall intersect the channel in a manner such that the interior angle measured from their ce nterlines of flow is less than or at most equal to 90 degrees. Riprap , articulating concrete matting, or other suitable protection is required from the top of the pipe at the outlet point to the bottom of the channel and on the opposite channel bank to City of Charleston Stormwater Design Standards Manu al Design Requirements 3-8 prevent scour and erosion. Pipe must be cut at outf all to be flush with the bank of the intersecting channel. 11. Storm drainage pipe discharging into wet ponds shal l have the discharge invert above the permanent pool elevation. 12. Any connections to existing brick arch drainage systems shall be coordinated with the Department of Stormwater Management during initial planning st ages. Failure to communicate early in the design process will delay processing. 13. A maintenance access point shall be available at a minimum within every 200 f eet for closed conduit conveyance structures (e.g., pipes). Juncti on boxes with manholes shall be placed at all pipe intersections, grade changes, alignment changes, and pipe size or geometry changes. 14. Hydraulic grade line and head loss calculations for determining water surface elevations shall be performed for all system connections. 15. Calculations shall be performed for the appropriate design storm event , as prescribed in Section 3.9.3 . 16. Storm drain profile plots shall be included in the set of construction plans and shall show the hydraulic grade line for the required design storm. 17. Storm drainage systems shall be designed to convey stormwater runoff by gravity flow (during the required design storm hydraulic grade line must rem ain below pipe crown) unless otherwise approved. 18. It shall be unlawful for any person to uncover any component of the public stormwater system or connection branches thereof, for any purpose or to make connection therewith, unless and except with the approval and inspection of the Department of Stormwater Management. 19. A 5 foot horizontal separation shall be maintained between the outside edges of the public stormwater system and any new pipes or conduits laid in a street. 20. In opening trenches in any street or public way, the paving or ballast shall be removed in a manner directed by the Department of Stormwater Management . The sides of the trench shall be sheeted or braced in accordance with current Occupational S afety and Health Administration standards. The earth removed from the trench shall be placed s o as not to obstruct the gutters and so as to cause the least obstruction to public travel. Gas and water pipes shall be protected from injury, the trench shall be enclosed and lighted at night, and every precaution shall be taken to prevent injury to person or property during the progress of the work. 21. Notice shall be left at the Engineering Division of the Department of Public Service two working days prior to the beginning of any work laying a storm drain. No material shall be used or work covered until inspected and approved by the Enginee ring Division. 22. The area upstream of and outside a project area (i.e., offsite areas) that drains to a particular design point (on or downstream from the project area) shal l be included in determining the appropriate conveyance size. Hydrological computations shall be based on the contributing watershed, not just the project area or disturbed area. 3.4.6.2 Culverts 1. Culvert design shall include all cross drains that transport stormwater runoff under roadways. Culvert selection techniques can range from using e mpirical formulas, nomographs and charts; or City of Charleston Stormwater Design Standards Manu al Design Requirements 3-9 comprehensive mathematical analysis for specific hydraulic conditions. The models used for these calculations are listed below in item 8. Other wide ly accepted models may be used, but shall be approved by the Department of Stormwater Management . Designs shall be based on SCDOT requirements as defined in the SCDOT Requirements for Hydraulic Design Studies manual. 2. Proper consideration of inlet and outlet control shall be given in the design of culverts and outlets. 3. The pipe, appurtenant entrance, and outlet structur e shall properly account for water, bed-load, sedimentation, and floating debris at all stages of flow. 4. The outlet shall be designed to prevent undermining and washout. 5. A 25 percent factor of safety in flow area shall be used for culvert design to account for debris and clogging. If culvert grating within the cross secti on is proposed, then a 50 percent factor of safety shall be used for grate area calculations. This can be done with a reduction in the overall culvert size or utilizing a bottom clip to obtain the necessary factor of safety. 6. The 20 percent, 10 percent, 4 percent, and 1 percen t AEP, 24-hour storm event hydraulic grade lines shall be included in the Permit Package as pa rt of the Engineering Report narrative. All four of the hydraulic grade lines are not required to be shown on the construction drawings. The design storm event is based on the SCDOT Requirements for Hydraulic Design Studies manual. 7. Additional hydraulic capacity shall be required as necessary to prevent backwater effects that may adversely impact upstream property or structures. 8. Acceptable models for designing culverts are discus sed in Section 3.4.4.2 . Culvert nomographs are allowed in instances where backwater and tailwater conditions do not apply. 9. A complete study of culverts and design considerations is provided in USDOT (2001a). 3.4.6.3 Headwalls and Outlets 1. All exposed ends of pipes shall be protected by one of the following methods: a. Riprap headwalls are acceptable for pipes 24 inc hes or less. Note that this technique requires the use of filter fabric. b. Flared end sections are acceptable for pipes 36 inches or less in diameter. c. Concrete headwalls are required on culverts with a diameter of 24 inches or greater where a flared end section is not used. 2. Storm drainage or pond outfalls shall be carried to an existing conveyance system. 3. For any outfall routed into and through existing wetlands area: a. Demonstrate that the wetlands located on the sit e can act to manage the runoff generated with reasonable assumptions regarding the wetlands condi tion. A baseline functionality shall be provided for the existing wetlands relative to water surface elevations and conveyance capacity to be used in the event the wetland system is not f unctioning hydraulically as designed. If maintenance within the wetland would need to be acc omplished by the City, the City would then have to coordinate with the USACE on work with in the wetland to return the system to that baseline functionality. b. Provide a method ensuring the on-site wetlands t hat would be a component of stormwater management on your site are not impacted by future projects (operating BMP might be an approach that would work). City of Charleston Stormwater Design Standards Manu al Design Requirements 3-10 c. Demonstrate that your site stormwater does not h ave off-site impacts in the 1% AEP. This would include the adjacent properties that share the wetland system. 4. No new point discharge onto adjacent property where there was not an existing point discharge shall be allowed without the adjacent property owne r’s written consent, or where an existing stormwater drainage easement exists within a public drainage easement. 5. Discharge points created by construction, developme nt, and redevelopment shall connect to an existing drainage system, whether natural or man-ma de. The new outlet shall not cause flooding or in any way degrade the existing stormwater drainage system and proof of such shall be provided. In some cases, conveyances shall be constructed fro m the project to a point of discharge into the existing stormwater drainage system and this shall be done at the owner’s expense. In these cases, the owner shall be responsible for obtaining necess ary easements and agreements to construct such. If no easement is downstream of the site, the pre-development and post-development peak flow rates must match and runoff volumes must not increase. 6. The inverts of all discharge pipes and channels sha ll not be less than 5.5 feet North American Vertical Datum (NAVD) 88 or 2 feet above MHHW (refe renced to NAVD88), whichever is greater. Any variance request from this standard shall incor porate measures to prevent sedimentation and the need for frequent maintenance. 7. Outlets shall not discharge on fill slopes. 3.4.6.4 Energy Dissipation Structures 1. All outlets shall be sufficiently stabilized. Calcu lations shall be provided justifying the design and material used (e.g., riprap aprons, geometry, and d iameter). SCDOT methodologies are acceptable. 2. If riprap aprons are used, filter fabric shall be installed beneath the apron. 3. If Level spreaders, plunge pools, etc. are used, th en they shall be properly designed and installed at the proposed outlet(s). 3.4.6.5 Catch Basins, Inlets, Manholes, and Junctio n Boxes 1. Materials and construction shall be as specified in Section 719 (Catch Basins, Drop Inlets, Manholes, Junction Boxes, and Spring Boxes) of the latest SCDOT specifications. 2. Side inlet catch basins or junction boxes with concrete covers shall have a metal ring and manhole lid cast within the top for easy access. Manhole lids and catch basins shall contain a label identifying the system as stormwater and marked with an appropr iate stormwater awareness message such as ‘No Dumping – Drains to Waterways.’ Contact the Department of Stormwater Management for more information. 3. When the depth of a catch basin or junction box exc eeds 4 feet, rungs or steps shall be provided for ascent and descent. Steps shall be American Soc iety for Testing and Materials (ASTM) C478 or equivalent. 4. The box top shall be a minimum of 3 feet by 3 feet. Sides shall be plastered with non-shrink grout. Circular junction boxes with tapered top section are also permitted. 5. Pipes entering or leaving a catch basin or junction box shall not protrude more than 6 inches into the box. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-11 6. Roadway catch basins, concrete flumes, and curb cut s shall comply with the latest SCDOT standard specifications and details. 7. Maximum roadway catch basin inlet capacity for an i nlet shall be determined based on the following: a. For inlets at sags, capacity shall be based on e ither weir flow (unsubmerged) or orifice flow (submerged). The depth of flow shall be limited to the curb depth, but may be further limited by the allowed spread. In sag conditions, a 15 percent factor of safety shall be used to account for debris and clogging if an open throat inlet is proposed. A 50 percent factor shall be used if a grate is proposed. b. For inlets on grades, theoretical capacity shall consider in the design the longitudinal and cross slopes, and gutter depression. The length of the gu tter opening shall be such that the gutter efficiency is 80 percent of the theoretical capacit y. Maximum flow depth shall be limited to the depth of curb. 8. SCDOT Type 9 inlets shall be designed to accommodat e a given flow based on road type and so as not to cause flooding on adjacent property. 9. It is desirable to locate catch basins outside curve radii. If this is not reasonably possible, the catch basin shall be set back an extra 1 foot and the fac e of the catch basin shall be parallel to a chord joining the two points on the curve radius located by projecting lines from the sides of the catch basin box. 10. Where possible, junction boxes and catch basins sha ll contain a minimum drop of 0.1 feet from invert in to invert out. 11. Waffle and knockout boxes are prohibited. Boxes with pre-cast openings shall be used. 12. Inlet catch basins shall have a 1-foot sump at the bottom to contain sediment and debris. 13. Within a catch basin, inlet, manhole, or junction b ox, the elevation at the crown of any inlet pipe shall be equal to or greater than the crown of the outlet pipe. Where crowns do not match, the engineer must demonstrate that the unmatched crowns do not adversely affect the capacity or functionality of the system. 14. Rubber gaskets and resilient flexible type connections conforming to ASTM C923 shall be used for all pipe-to-box connections, including road subgrade connections. Pipes shall enter perpendicularly to the face of the box. Pipe may extend into the box such that it breaks the plane of the inside wall, but by no more than 6 inches. If pipes must enter s tructure at an angle, circular junctions shall be used. Use of an approved alternative detail will be allowed for non-perpendicular pipe connections where circular junctions cannot be used. 15. Subgrade drains connected to catch basins, manholes , or junction boxes shall be required for the length of all roads unless a geotechnical report shows less is necessary. 16. All stormwater structures under this heading shall be backfilled in 6 inch lifts compacted to 95 percent Modified Proctor Compaction Test maximum density. 17. Inlet protection shall be provided at all inlets in to the stormwater system during the construction of the project until the closure procedures have been completed or notification from the Department of Stormwater Management has been given stating tha t an acceptable level of stabilization has been achieved. Guidance on design, installation, and maintenance of inlet protection can be found in the latest SCDOT specification. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-12 18. Inlet spacing shall be based on the maximum spread of water into the travel lane. Allowable gutter spread is limited to one-half of the travel lane fo r the appropriate design storm listed in SCDOT Requirements for Hydraulic Design Studies (2009). Inlet spacing for alleys shall be based on a 50 percent AEP storm event, limited to one-half of the travel lane. 19. Inlets upgrade of a road intersection, sag inlets, or the last inlet for a given system shall be designed with sufficient capacity to handle the entire flow, such that there is no flow through or bypass. Spread calculations shall be provided for review by the Engineering Division of the Department of Public Service. 20. Maximum depth in which the water may pond above or around an inlet shall not threaten surrounding permanent structures or facilities including vehicular or pedestrian traffic. 21. Design procedures for inlet and stormwater facility design may be referenced in AASHTO (1999), USDOT (2001c), Mays (2001), and Yen (2001). Culvert design guidance is found in USDOT (2001a). 3.4.6.6 Underdrain Piping Underdrain piping may be polyvinyl chloride (PVC) or polyethylene (PE) pipes in accordance with Section 802 (Pipe Underdrains) of the latest SCDOT specifications. 3.4.6.7 Emergency Spillways All ponds shall have an emergency spillway designed to convey the peak flow associated with the 1 percent AEP, 24-hour storm event if the stora ge capacity is exceeded. All emergency spillways shall be armored to resist erosive flows. For a system of ponds, the downstream-most pond shall have an emergency spillway able to pass the 1 percent AEP storm event, and the design shall demonstrate how the overtopping flow paths from the remainder of the ponds avoids impacts to buildings. 3.4.6.8 Open Channels Open channels shall include all permanent storm dra inage channels including swales, ditches, and diversions. These stormwater drainage systems shall be designed based upon the following criteria: 1. Open channels shall fully contain all stormwater fr om the appropriate design storm event with no overtopping of the bank along the channel’s entire length. 2. The design of open channels shall be based on Manning’s Formula. Where backwater effects from obstructions and/or tailwater is are present, the d esign of open channels shall be based on the Saint-Venant Equations. 3. The minimum channel grade shall be 0.003 ft/ft and shall be designed to accommodate flows resulting from the appropriate design frequency storm. 4. Design conditions can be assumed to be steady, uniform flow. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-13 5. Channels may be designed with multiple stage levels with a low flow section to carry the 50 percent AEP, 24-hour storm event and a high flow section to carry storms of larger frequencies up to the 1 percent AEP, 24-hour storm event. 6. The City encourages vegetated channels. Guidance on the design of these types of channels can be found in the Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014). 7. Additional hydraulic capacity shall be required as necessary to prevent backwater effects that may adversely impact upstream properties or structures. 8. The side slopes of grassed lined channels without e rosion control blankets or turf reinforcement matting shall be no steeper than 3H:1V. 9. Open channels shall be uniform and shall be stabili zed to prevent erosion in a manner approved by the Engineering Division of the Department of Public Service. Acceptable techniques are shown in SCDHEC (2005). 10. Permissible velocities for channels shall be establ ished and not exceeded during the design storm(s) used to size the conveyance. In the case of an existing conveyance, permissible velocities shall not be exceeded during the design storm(s) us ed to size the outlet. See Table 3-4 for vegetated channels. For bare soils, permissible vel ocities will depend on the nature of the soil (cohesiveness and void ratio) and runoff (sediment concentration). Mays (2001) provides graphs to select the permissible velocity. For typical soi ls in the City, the maximum permissible velocity is less than 3.5 fps. For well vegetated channels, velocity shall be 5 fps or less. Table 3-4. Maximum permissible velocities for chann els Cover Permissible Velocity (fps) a Erosion Resistant Soils Easily Eroded Soils % Slope % Slope 0-5 5-10 > 10 0-5 5-10 > 10 Bermuda Grass 8 7 6 6 5 4 Buffalo Grass 7 6 5 5 4 3 Blue Gamma 7 6 5 5 4 3 Centipede Grass 7 6 5 5 4 3 Kentucky Bluegrass 7 6 5 5 4 3 Grass-legume Mixture 5 4 NR 4 3 NR Lespedeza Sericea 3.5 NR NR 2.5 NR NR Temporary Vegetation 3.5 NR NR 2.5 NR NR Sources: Schwab and Frevert (1985), Haan. Barfield, and Hayes (1995); and NRCS (2007), General guidance on open channel design can be found in USDOT (1996, 2001b). NR = Not Recommended a Allow velocities over 5 fps only where good cover and maintenance will be provided. If poor vegetatio n exists due to shade, climate, soils or other factors, the permissible velocity shall be reduced by 50 percent. 11. Acceptable models for designing open channels are d iscussed in Section 3.4.4.2 . City of Charleston Stormwater Design Standards Manu al Design Requirements 3-14 3.4.7 Roadway Drainage Design This section provides additional design requirements for stormwater drainage on roadways. 1. Roadside channels shall meet the definition of a swale. 2. For the purposes of road passage and hydraulic desi gn, the capacity of a system to transport stormwater runoff shall be based on the criteria provided in Section 3.4.6 . 3. The minimum street center line elevation at finish grade shall be 7.5 feet NAVD88. If a model demonstrates site-specific considerations, a minimu m street center line elevation of no less than 5.5 feet NAVD88 will be allowable. 3.5 Redevelopment Requirements According to the definition in the City of Charlest on Ordinance, redevelopment pertains to development on a previously developed site where the impervious surface exceeds 20 percent of the total site and improvements to subject property exceed 50 percent of the total site value. For purposes of this requirement, redevelopment does in clude remodeling of existing building interiors, resurfacing of paved areas, and exterior building changes. Redevelopment excludes ordinary maintenance activities which do not increase or concentrate stormwater runoff or cause additional nonpoint source pollution. All requirements of this section need to be met for the entire parcel in question but does not apply to parcel are as that are less than 1 acre or sites with a greater than 80 percent existing building footprint that is not being removed. 3.5.1 Redevelopment Standards In an effort to improve stormwater management on existing developed sites, the City requires one of the following performance standards to be implem ented on redeveloped sites (City of Charleston Ordinance (Section 27-29)): • Reduce the impervious cover on the site by at leas t 20 percent, based on a comparison of existing impervious cover at the time of submittal of a Construction Activity Application (CAA). Note that permeable pavers that are only being used to meet this requirement and meet the material and construction requirements of the Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014) do not require infiltration or Seasonal High Water Table testing. • Achieve a 10 percent reduction in the 24-hour volu me of runoff generated from the site by a 50 percent AEP storm event. Runoff calculations shall be based on a comparison of existing site conditions at the time of submittal of a CAA to the post-development site conditions. Confirm the post-development peak discharge rate does not e xceed the pre-development peak discharge rate for the 50 percent AEP storm event. • Reduce the post-development peak discharge rates b y 10 percent of the existing peak discharge rates at the time of submittal of a CAA f or the 10 percent and 4 percent AEP storm events based on a comparison of existing ground cov er at the time of submittal of a CAA to post-development site conditions. Confirm the 24-ho ur post-development volume does not exceed the pre-development volume for the 10 percen t and 4 percent AEP storm event. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-15 For non-special protection areas, one of these requ irements shall be applied unless adequate downstream storm drainage conveyance capacity all t he way to receiving waters can be demonstrated. For special protection areas, one of these requirements must be applied in addition to the requirements set in Section 3.9.3 and Section 3.6 . 3.5.2 Redevelopment Exemptions Exemptions must be documented for City approval as stated in Section 4.10 . Exemptions for redevelopment include: • Construction or improvement of a SFR, except for S FR located in a special protection area adding 500 square feet or more impervious area. • Minor land disturbing activities that do not distu rb more than 0.5 acres, are not part of a LCP, are not located in a special protection area and do not increase post-development impervious area by greater than 10 percent of the impervious area at the time of submittal of a CAA. 3.6 Special Protection Areas In an effort to address some of the most critical w ater resource problems that exist in the City, special protection areas have been established. Any development or redevelopment within or discharging to these special protection areas must comply with a more stringent set of design criteria in addition to the minimum standards and LOS determined by the City. For any conflicting design criteria, the more stringent set will supersede the minimum standards for special protection areas. Please note that these standards are based o n the entire parcel area, but applicable to only the disturbed areas of the property associated with the project. The City can designate any area as a special protection area. The permittee has the responsibility to contact the City through the Technical Review Co mmittee (TRC) to determine whether the proposed project site is within or discharging to a special protection area. The Director of Stormwater Management shall make the determination on whether a site is within a special protection area. 3.6.1 Areas Associated With Known Flooding Flooding occurs in many locations around the City where development has increased stormwater runoff to the point that stormwater conveyance syst ems have become overwhelmed. The following design criteria shall be used for project s discharging to receiving waters within these special protection areas outside of linear projects located on existing public infrastructure (i.e. addition of sidewalks or turn lanes): • For parcel areas of 1 acre or more where a Constru ction Activity Application is required, the City requires one of the following performance standards to be implemented.: o Achieve a 20 percent reduction for the 50 percent, 10 percent, and 4 percent AEP storm event peak flow rate and 24-hour discharge vo lume. However, no site shall be required to reduce below the values for an undevelo ped site with the assumption of City of Charleston Stormwater Design Standards Manu al Design Requirements 3-16 cover as good condition woods. If only Low Impact D evelopment (LID) practices as defined by Table 4.1-1 in the Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014) are utilized or the project is utilizing City funding then the 20 percent reduction may be revised to a 15 percent reduction. o If it can be shown that the proposed work will gen erate no additional runoff volume or changes in discharge rate in the post-development c ondition for the 50 percent, 10 percent, and 4 percent AEP storm events, then the r equirements can be met by providing storage equal to 50 percent of the existi ng condition 24-hour runoff volume for the 4 percent AEP storm event. If the project u tilizes City funding then only 40 percent of the existing condition runoff volume for the 4 percent AEP storm event must be provided. If Low Impact Development (LID) pract ices as defined by Table 4.1-1 in the Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014) are being utilized, then every 1 unit of storage for these practices can count as 1.1 units to meet the required storage volume. A technical procedure document has been provided wi thin the manual to provide additional information on how this requirement is satisfied. • For SFR or non-SFR parcel areas with an increase o f 500 square feet of impervious area or more and no Construction Activity Application, offs et the increase in runoff through implementation of runoff control practices (e.g., d isconnected downspouts, rain garden, infiltration trench, rain barrel in Table 3-5 ). Per Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014), rain barrels should be used w here there is a direct corollary reuse demand. In absenc e of such, an orifice outlet should be used to slowly drain to impervious surfaces. Table 3-5. Runoff Control Practices Reduction Practice Requirement Disconnect Downspouts from Impervious Areas or Piped Systems 500 sf of impervious area allowed per 500 sf of roof area disconnected Install Rain Barrel 500 sf of impervious area per 50 gallon rain barrel installed Install Rain Garden 500 sf of impervious area allowed per 50 sf of rain garden installed Install Infiltration Trench 1’ deep x 2’ wide trench filled with clean sand along each side of surface features such as driveways or patios with no more than 15 feet of linear unit area flowing to the feature Additional stormwater design criteria may be determ ined and required by the Department of Stormwater Management during the permitting process. 3.6.2 Areas Discharging to Total Maximum Daily Load and Impaired Waters Projects that discharge either directly or indirect ly into an impaired waterbody as determined by the existence of an adopted TMDL by SCDHEC or throu gh SCDHEC’s listing of the waterbody on the latest Section 303(d) list shall reduce poll utant loads to meet applicable water quality City of Charleston Stormwater Design Standards Manu al Design Requirements 3-17 standards. This will require the installation and i mplementation of measures, structural or non- structural BMPs shall adequately reduce pollutant loads to levels required by the TMDL (currently expressed as percent reductions) or prevent further impairment. An evaluation of the BMPs chosen to control the release of pollutants shall b e provided. Such evaluations may reference published values on BMP effectiveness. The followin g design criteria shall be used for projects occurring within or discharging to these special protection areas: • BMP and water quality analysis following design pr ocedures in Section 3.12 . Buffers along perennial and intermittent streams ad jacent to the project within a watershed where there is an established TMDL involving waste load allocations associated with non-point source pollution. Buffers shall be required on wat ers as dictated by the City to minimize any further degradation of impaired waterbodies, pendin g TMDL waterbodies, or anticipated impairment of a waterbody. Within buffer areas, significant sources of aquatic contamination and degradation shall be excluded including construction resulting in land d isturbance, impervious surfaces, logging roads, mining, septic tank drain fields, agricultur al fields, waste disposal sites, stormwater BMPs (except those designed as wetlands), access of livestock, clear cutting, and application of pesticides and fertilizers. The width of buffers shall be as follows: o Base width shall be 50 feet plus 2 feet per 1 perc ent of slope of the stream valley, centered on the stream. o Existing impervious surfaces in the riparian zone as well as wetlands do not count toward buffer width (i.e., the width is extended by the width of the impervious surface, just as for wetlands). o Slopes over 4H:1V do not count toward the width. 3.6.3 Basin Specific Requirements Certain basins within the City have been studied in additional detail to develop basin specific requirements that target the specific stormwater management needs of an area. Projects in these areas are required to meet additional basin specifi c requirements. Basins may be added or modified by City Council. Information regarding existing or anticipated basin specific requirements and justifications are maintained on the City’s website: https://www.charleston-sc.gov/2144/Stormwater-Management 3.6.3.1 Church Creek Drainage Basin Requirements The Church Creek Drainage Basin drains nearly 5,000 acres located along the western side of the Ashley River. The drainage basin consists of a natural drainage channel and marsh area located between the outlet under U.S. Highway 61 and the Seaboard Systems Railroad. Studies have been completed in the Church Creek Dra inage Basin to analyze the flooding that occurs during minor storm events. Properties in the drainage basin experience severe flooding because of the topography and the insufficient stor mwater infrastructure. Specific stormwater standards have been established to lessen the impac t of proposed development and City of Charleston Stormwater Design Standards Manu al Design Requirements 3-18 redevelopment within the drainage basin. Projects in the Church Creek Watershed shall meet the following requirements: 1. From City of Charleston Ordinance (27-102) a. Detain the excess runoff volume difference betwe en the pre-development and post- development conditions for 24-hours for the 50 perc ent, 10 percent, 4 percent, 2 percent, and 1 percent AEP, 24-hour storm events. b. Detention facilities shall be designed and const ructed to contain the excess runoff volume difference between the pre-development and post-dev elopment conditions for the 24 hour period and the volume required to release the post- development peak flow rates at or below the pre-development peak flow rates. c. These requirements are specified in the City of Charleston Church Creek Watershed Storm Water Master Plan Summary Report (Woolpert, LLP 200 1) and more fully explained online at: https://www.charleston-sc.gov/1515/Church-Creek-Dra inage-Basin 2. Runoff Volume and Release Rates a. Release rates will be controlled to prevent down stream impacts. b. For areas in the Church Creek Basin north of Bee s Ferry Road, storm event volumes above predevelopment volumes shall be released over a min imum period of 72 hours. c. For areas located south of Bees Ferry Road, rele ase rates shall be reviewed on a case-by- case basis to determine the optimum storage period based on conditions anticipated during a 100-year event. 3. Main Conveyance Components a. A main conveyance is defined as a drainage asset that serves 100 lots or more or provides drainage for more than one subdivision or community or commercial project greater than 30 acres. b. Main conveyance components shall use open draina ge channels and ponds to move large volumes of stormwater over long distances. c. Culverts may be used where required where main c onveyances cross topographical features. d. Box culverts or pre-engineered spans or bridges shall be used in lieu of pipes for locations where main conveyance assets or channels cross road ways or trails. e. Channels shall be sized to operate at full capac ity with reasonable vegetation growth. A channel opening dimension factor of safety of 125 p ercent shall be used for conveyance structures to account for normal accumulation of de bris and sediment between maintenance cycles. The 125 percent factor of safety shall be b ased upon hydraulic capacity during the 2 percent AEP and 1 percent AEP storm events. 4. Conveyance culverts a. Conveyance culverts shall be sized to ensure ope ration at full required capacity under severe conditions common in the area of installation. b. Minimum sizes shall be determined to reduce the potential for fouling or clogging due to trapped debris. Culverts shall be sized with a 125 percent safety factor based on hydraulic capacity during a 2 percent AEP storm event to allow for normally occurring conditions. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-19 c. Culvert headwalls shall include robust component s not easily damaged by a backhoe or excavator bucket. 5. Easement Requirements a. The minimum required easement width for any open conveyance shall be 24 feet. This easement shall include maintenance shelf accessible to a public right-of-way of 20 feet. Easements will be required on both sides of the cha nnel if there is more than 20 feet between the top of banks. b. For open conveyances greater than 4 foot wide an d/or 4 foot deep, the easement width shall be increased by 2 feet for each foot of channel width or depth in addition to 4 feet. c. Channel easement width shall be adequate for the channel as well as for access and maintenance. d. Access shall be sufficient to allow for loading and unloading of equipment and enable mowers and excavators to traverse the length of the convey ance asset. Access for loading/unloading equipment shall be within, adjacent to, and nearby to enable efficient maintenance activity. e. Main conveyance easements shall allow for a main tenance shelf on one side of the channel. Side slopes shall include a maximum slope of 2.5H:1V. f. Projects where alternate channel side slopes are proposed, such as a wall, bulkhead, or hardscape will be considered on a case-by-case basis. g. The minimum width for a main conveyance channel easement shall be 50 feet. Access and shelf areas shall accommodate maintenance equipment such as excavators and other equipment required for effective operation to trans verse, function, and free move without risks associated with encroaching upon private property. h. Maintenance access easements shall be provided o n each side of culvert crossings parallel to the flow way to enable maintenance equipment to sta ge and operate without risk of inflicting permanent damage to improvements in the easement. 6. Surge Protection a. Discharges to tidally affected receiving waters shall be equipped with surge protection devices. b. Surge protection devices will not be required in areas located upstream of existing devices where protection is provided. c. Devices shall be located to facilitate maintenan ce and shall be constructed of stainless steel, aluminum, or other materials that are corrosion res istant and designed for installation in a marine, saltwater environment. d. In cases where maintaining tidal flow under norm al conditions may be necessary, a self- regulating tide gate shall be used to prevent storm surge in upstream areas. Tide gates and self-regulating tide gates shall be manufactured from non-corrosive material. 7. Floodplain Storage a. Floodplain storage impacts that reduce storage s hall be prevented. b. In cases where floodplain impacts are proposed, impacts shall be mitigated on a minimum 1.25:1 basis based on storage volume to prevent deterioration of basin storage capacity during storm events over time. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-20 c. Mitigation shall be within the same basin having an effect on the same water surface elevations and hydraulics as the proposed impact. 8. Basin Improvement Plan Participation: a. Projects located in a portion of the basin where capital improvements have been recommended to improve drainage or reduce flooding potential, designers may incorporate improvements into site design plans, provided the drainage improvements shown on plans are consistent with the function, intent, and effect of the capital improve ment project recommended in the Church Creek Basin Study or any prior or subsequent study or evaluation commissioned by the City or their agent. b. Projects will be reviewed on a case-by-case basi s and the City reserves the right to engage in collaborative and creative design efforts that resu lt in improvements to drainage in the basin serving the best interest of the public. c. As part of the TRC review process, basin improve ment plans that may work in conjunction with site development or redevelopment will be reviewed and summarized to determine consistency. 9. Infiltration a. The soil characteristics of fill material placed on non-structural areas to ensure that granular soils are used which promote infiltration and reduce runoff. b. Soil infiltration BMPs shall be incorporated int o the site design where practical. c. Soils in non-structural areas shall have an infi ltration rate of 0.3 inch per hour or greater. d. Infiltration BMPs must be consistent with the most current version of the Low Impact Development in Coastal South Carolina: Planning and Design Guide (Ellis et al . 2014). 10. Low Impact Development a. Home builders shall be encouraged to retain stor mwater on site for re-use as irrigation water. b. Low Impact Development aspects shall be consider ed during the design process to help mitigate stormwater runoff volume while improving q uality. 3.7 Sea Level Rise and Tailwater Conditions The City has adopted a sea level rise strategy to a ccommodate future sea level rise and storm surge. The Flood and Sea Level Rise Strategy (City of Charleston 2019b) can be found at: https://www.charleston-sc.gov/slr To accommodate sea level rise and storm surge, all designs shall use 5.5 feet NAVD88 datum tailwater elevation as a boundary condition with roadway elevation no less than 7.5 feet NAVD88. If the developer/designer desires to design a lower road elevation, they shall develop a hydrologic and hydraulic model, using computational methods or software approved by the City’s Department of Stormwater Management, that demonstrates the performance of the roads during a 1 percent AEP, 24-hour storm event that coincides with a storm surge elevation of 5.5 feet NAVD88. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-21 The tidal range used in any stormwater model must match the range shown at the most adjacent tidal station (NOAA stations are acceptable). The bottom of the range must be vertically adjusted so that the top matches the required high water elevation of 5.5’ NAVD88. This condition can be included in the boundary set and applied to the fur thest downstream node or entered at the furthest downstream node in a time / stage table. The tidal data must be extended a minimum of 24 hours or long enough to show that all SWDSM requ irements are being met. The model can show the tide changing from the low water elevation to high water elevation every six hours, but the peak of boundary condition must be adjusted to match the peak of the model’s hydrograph. Please note that all offsite runoff that will impac t the tailwater condition of this site will also ne ed to be included in the model being used to show compliance with the requirements of this manual. This modeling effort is required regardless of if a 1% analysis is needed for a project and the modeling may need to be extended downstream if ther e is a constriction that will impact the tailwater condition for this project. An alternative to utilizing dynamic tailwater condi tions and offsite modeling is to take a conservative approach by modeling a peak static and ‘free’ tailwater condition and taking the worst-case values of each storm event analysis to show compliance with the City’s requirements listed elsewhere in this document. 3.8 Soils and Geotechnical Information Information on the native soils in the City can be obtained from the NRCS Web Soil Survey at the following website. https://websoilsurvey.nrcs.usda.gov/app/HomePage.htm The challenge with most of the soils in the City is that they are no longer native because they have been modified by development. The modifications may include compaction or import of non- native fill. The best way to understand the types o f soils that are on a site is to hire professional engineers, geologists, or scientists. They can provide critical information such as soil types, depth to relatively impenetrable soil type, and depth to groundwater and infiltration ability. These are critical considerations when performing calculation s for stormwater runoff and determining the ability to implement green infrastructure. 3.9 Permanent Stormwater Design This section discusses the design criteria for stormwater management measures that will remain after the construction project is complete. Permane nt stormwater management measures are separate but can be related to measures required du ring construction. Important considerations in all permanent stormwater management measure designs are access and ease of maintenance. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-22 3.9.1 Introduction to Permanent Stormwater Design R equirements 3.9.1.1 Stormwater Quantity Control Water quantity control is an integral component of overall stormwater management. Its purpose is to negate the effects of development during stor m events. Quantity control is effectively flood control, reducing potential damage and health risks , but because uncontrolled runoff can cause erosion, it can also be a form of water quality control. The design criteria, as described in Section 3.12 , shall be considered when determining the types of quantity controls to be implemented in a project. For further information and documentation on the design, installation, and maintenance of stormwater quantity facilities, see the Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014) . 3.9.1.2 Stormwater Quality Control: Water quality control is an integral and required component of an overall stormwater management system. Construction, development, and redevelopment projects shall include controls that treat or otherwise limit the discharge of pollutants. These requirements have been added due to State and Federal requirements, but also due to the need to improve and preserve the water resources in the City. • Use of BMPs : Stormwater runoff generated from construction, de velopment, and redevelopment shall be treated through the use of s tructural and/or non-structural practices. It is presumed that sufficient treatment is provided by the proposed BMPs if they are: o Designed according to the specific performance cri teria outlined in the SWDSM o Constructed properly o Maintained regularly • Special Protection Areas : Stormwater discharges to special protection areas with sensitive resources or that have existing flooding or water q uality problems (e.g., recreational waters, water supply reservoirs, TMDLs, and Section 303(d) listed waterbodies) are subject to additional performance criteria. Additional performance criteria are listed in Section 3.6 . • Maintenance Agreement : All BMPs shall have an enforceable operation and maintenance agreement to ensure the system functions as designe d. • Sediment Basins : Sediment basins and other BMPs shall be used duri ng construction to remove heavy sediment loads from runoff waters leaving the disturbed area. • Disturbed Area Limit : Clearing for installation of utilities and roads or for development shall be allowed, but limits have been established. The t otal disturbed area shall not exceed 25 acres. The Department of Stormwater Management may reduce the total area that may be disturbed at any time. Project areas exceeding 25 a cres in disturbed area shall be phased to comply with this requirement. All clear-cutting are as shall be clearly identified on construction documents. The decision to consider an activity as clear cutting (logging) versus land disturbance for development shall belong to the Dir ector of Development Services or their designee. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-23 • Wetlands : o If wetlands are suspected to exist on the property , they shall be investigated and delineated by a qualified consultant. The USACE and OCRM policies regarding wetlands shall be followed. o Where existing wetlands are intended as a componen t of an overall stormwater management system, the approved plan for stormwater management shall not be implemented until all necessary Federal and State permits have been obtained. • Vector Control : Stormwater management and sediment control practi ces shall be designed, constructed, and maintained with consideration of t he proper control of mosquitoes and other vectors. • South Carolina Building Code : On all new construction or renovations required by the South Carolina Building Code to conform to requirements f or new buildings, it shall be unlawful for any person to collect stormwater for deposit on any public street, sidewalk, or right-of-way, or otherwise suffer or permit, or by mechanical means propel stormwater on such public street, sidewalk, or right-of-way. 3.9.2 Permanent Stormwater Design Volumes The City has adopted a tiered approach to managing post-construction stormwater runoff. One of the goals of this approach is to reduce stormwater runoff and thus reduce stormwater pollutant loads. If stormwater runoff volumes are removed thr ough infiltration, evapotranspiration, or beneficial reuse, then the pollutants associated with those volumes will also be removed. The City requires that all post-construction stormwater runoff from development or redevelopment sites that require a Construction Activity Applicat ion be managed for water quality control; Four technology tiers are available for use to meet this runoff management requirement. Each tier prescribes a maximum amount of rainfall (rainfall d epth) be applied to the area draining to the four technology tiers. These rainfall depths correspond to a runoff volume to be treated. Post-construction stormwater runoff from the developed site must be managed through one, or a combination of the technology tiers. Rainfall depths exceeding the values prescribed in Table 3-6 are allowed to bypass or pass through the permanent stormwater management practices. The rainfall depths for the four tiers are based on a 2 4-hour duration, Type III distribution storm and are summarized in Table 3-6 and described in detail in the following bullets: Table 3-6. Tiered approach rainfall depths based on a 24-hour duration storm Tier Rainfall Depth (inches) I – Green Infrastructure 1.0 I – Green Infrastructure (within 1,000 feet of shellfish beds) 1.5 II – Green Infrastructure with an Underdrain 2.0 III – Detention Practices 2.8 IV – Pass Through Devices Peak flow from 2.8 City of Charleston Stormwater Design Standards Manu al Design Requirements 3-24 • Tier I: Green infrastructure includes any permanent storm water management measure that infiltrates, evapotranspires, or beneficially reuse s stormwater runoff. These measures can be at a development or at a lot level. These measures provide water quality treatment through reduction of stormwater runoff volume. • Tier II : Green infrastructure with an underdrain provides some stormwater volume reduction as the stormwater infiltrates into surrounding soils a nd is absorbed by vegetation, but mostly provides water quality treatment through the filtering process. • Tier III : Detention practices are permanent stormwater mana gement measures that capture stormwater runoff and then release it slowly over t ime. These measures provide peak flow reduction and water quality treatment, but little t o no stormwater runoff volume reduction. This tier is not allowed for projects discharging within 1,000 feet of shellfish beds. • Tier IV : Pass through devices are permanent stormwater man agement measures that only provide water quality treatment. They do not provid e peak flow reduction or stormwater runoff volume reduction. This tier is not allowed for proj ects discharging within 1,000 feet of shellfish beds. • For Tier I – III (not within 1,000 feet of shellfish beds): Two appr oaches can be used to show water quality compliance as detailed below: o Place the computed water quality volume into the s tormwater practice at time zero and provide computations showing that the stormwater pr actice is still draining after 24 hours. o Show that the proposed stormwater practice is able to contain a storm event that generates an equivalent water quality volume and sh ow that the stormwater practice is still draining after 24 hours. Water Quality Volume: • The water quality volume for a construction projec t, or any portion thereof, is the stormwater runoff volume from the rainfall depth selected from the tier chosen, applied over the area of the disturbed area. • Designers may use different tiers for different portions of the construction project. • Designers may manage more water quality volume requ ired in portions of the construction project to compensate for portions of the project o nly where it can clearly be shown that they cannot provide the required water quality volume, p rovided the required water quality volume is managed for the disturbed area to the maximum ex tent practicable. • Detention practices shall return to their normal po ol elevation over a minimum period of 24 hours and maximum period of 72 hours unless otherwi se indicated by watershed models. • All projects within 0.5 mile of a receiving waterb ody in the coastal zone must meet Section III.C.3.XIII.A of the Coastal Zone Management Program Refinements. Recommended Methods and Design Procedures. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-25 3.9.3 Project Discharge Stormwater runoff generated and discharged from construction, development and redevelopment activities shall not exceed pre-development discharge rates for the 4 percent, 10 percent, and 50 percent AEP, 24-hour duration storm events. Of part icular importance to the City is whether detention anywhere in the watershed will cause down stream coincident peak flows greater than pre-development peak flow rates. The same hydrologic procedures shall be used in determining both the pre-development and post-development peak flow rates. All designs must also account for the discharge rat es and volumes into the downstream and adjacent properties if proper easements and permissions are not in place. Unless the discharge rates and total volumes for the site’s discharge lo cations onto downstream and adjacent properties match the pre-development conditions, a legal right from that property owner or a proper drainage easement for any increase in runoff rates and volumes would be required. In certain instances where re-development occurs within a Special Protection Area (see Sections 3.5 and 3.6 ), the Department of Stormwater Management may requ ire runoff rates be reduced below pre-development peak flow rates. 3.9.4 1 Percent Probability of Exceedance Storm Eve nt Analysis Construction, development, and redevelopment activities that disturb 1 acre or more or a project that needs to meet the rate and volume reduction re quirements of section 3.6.1shall include a hydrologic/hydraulic analysis to determine the impacts of the proposed development during the 1 percent AEP, 24-hour storm event. For the 1 percent AEP Storm Event Analysis, the project shall not: • Increase the likelihood of dwelling flooding and p roperty damage above current conditions. • Increase water surface elevations or reduce system capacity in the stormwater system and facilities upstream or downstream of the project. A n increase or reduction shall be based on a comparison with pre-development conditions (with mo re stringent requirements potentially applied in special protection areas). • Increase erosion potential and pollutant loads tha t would adversely impact the quality of receiving waters. If the project is in an area that has a stormwater master plan and model, the analysis shall use the boundary conditions from the master plan model provided by the City. The model shall extend up to the top of the watershed and down to the project. If the modeling results indicate there is an impact as listed above, then stormwater volume and flowrate leaving the site must be reduced until such point that there are no impacts. If the project is not in an area that has a stormwa ter master plan and model, then an analysis shall be performed from the top of the watershed to a point down system of the site where the site makes up 10% of the basin. The evaluation should also continue downstream for the project City of Charleston Stormwater Design Standards Manu al Design Requirements 3-26 to identify any likely choke points. If the modelin g results indicate there is an impact as listed above, then stormwater volume and flowrate leaving the site must be reduced until such point that there are no impacts. The analysis criteria shall include, but are not limited to: • Use current zoning for all upstream and downstream land parcels. • Utilization of existing land use curve numbers for all developed areas outside the project. • The weighted curve number for the proposed develop ment site shall be used. • Flows shall be routed using a hydrologic and hydra ulic method accepted by the City Department of Stormwater Management. Other calculations may be required by the Department of Stormwater Management based on the severity of potential impact and the location of the project. 3.9.5 Recommended Methods and Design Procedures 3.9.5.1 General Requirements for BMPs The following design criteria are established for p ermanent stormwater management BMPs and shall be incorporated in one or more BMPs for a giv en subbasin unless a specific quality design exception is granted by the Department of Stormwate r Management. Incorporation of these requirements shall constitute adequate control of the discharge of pollutants. • Quality Control Threshold : All sites that disturb 0.5 acres or more shall ha ve at least one permanent water quality structural BMP installed and shall require the execution of a CPMSF. • Pretreatment : Pretreatment devices or forebays shall be provide d as described in Section 3.10 . • Maintenance Plan : All BMPs shall have a maintenance plan. Suggested schedules and routine activities are provided in the South Caroli na BMP Handbook (SCDHEC 2005) and the Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014). • Effluent Limits : The Department of Stormwater Management reserves the right to require specific effluent limits for any pollutant from a s ite if necessary to ensure the water quality standards and other State and Federal water quality regulations are met. 3.9.5.2 Typical Design Procedures 1. Determine design criteria for site including additi onal criteria for redevelopment projects, projects in special protection areas, and projects with basin specific requirements. 2. Determine appropriate accepted BMPs needed for the site, considering the land use, pollutants of concern, soils, maintenance requirements, location in relation to receiving waters, and any impairments that may exist. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-27 3. For detention practices capturing runoff from 5 acr es or more, provide a forebay or vault at each inlet, unless the inlet provides less than 10 percent of the total design storm inflow to the pond. 4. Calculate the water quality volume using Equation 3-1. Equation 3-1. Water Quality Volume      12 Where: WQV = Water quality volume (acre-feet) P = Precipitation depth (inches) based on the tier selected DA = Drainage area to permanent stormwater manageme nt BMP (acres) 5. Compute the inflow hydrograph for the permanent sto rmwater management BMP for the 50 percent, 10 percent, 4 percent, and 1 percent AEP, 24-hour storm events for both the existing and proposed conditions. From this, determine peak flow rates for each storm. 6. Compute a stage-storage relationship for the propos ed BMP. A stage-storage curve defines the relationship between the depth of water and storage volume within the detention practice. 7. Compute the stage-discharge relationship for the ou tlet control structure. A stage-discharge curve defines the flow capacity of a structure at a given stage or elevation. 8. Perform routing calculations for the 50 percent, 10 percent, 4 percent, and 1 AEP, 24-hour storm events. Calculations may be done by hand or by using a storage routing computer model. 9. Evaluate the control structure outlet flow velocity and volume. Drawings and details shall be provided for outlet structures and basin. 10. Repeat steps 2-9 for post-development condition until peak, volume, and velocity criteria are met. 11. Submit calculations in the application package in a cohesive, easy-to-follow format. Stage-storage and stage-discharge calculations shall be included in the engineering calculations. Common methodologies for stage-storage curves inclu de the double end area method and the pyramid frustum method. Other methods will be accep ted upon adequate justification at the discretion of the Department of Stormwater Management. Hand calculations are available for routing hydrogr aphs through detention structures; however, they are time consuming and inefficient when multiple designs are required to be evaluated. For the SWDSM, the design engineer shall use one of the many computer software packages available to perform storage routing calculations. All models and methodologies used shall be approved by the City (Section 3.4.4.2 ). 3.10 Detention and Infiltration Requirements This section contains the requirements for the design and maintenance of permanent structural stormwater detention and infiltration practices. These practic es help to improve water quantity and quality and m ay be implemented as part of the overall site design for any project. The following requirements should be applied to all detention and infiltration facilities: City of Charleston Stormwater Design Standards Manu al Design Requirements 3-28 • Forebays and Pretreatment Devices : Permanent structural BMPs shall have a forebay or pretreatment BMP to facilitate more efficient remov al of debris and coarse sediments unless the inlet provides less than 10 percent of the tota l design storm inflow to the pond. These can be created through grading or a manufactured or engineered device. o Forebays shall be placed upstream of the inlets in to the main BMP storage area. o Unless a separate vault (engineered device) is to be used for the forebay, the forebay shall be separated from the larger BMP storage area by barriers or baffles that may be constructed of earth, stones, riprap, gabions, or geotextiles. o Maintenance of forebays shall be performed once a year unless otherwise specified by a manufacturer. Designs shall consider the maint enance needs by ensuring equipment has adequate access to forebay and adequa te clearance to perform dredging and cleaning operations. A visual marker s hall be placed in the forebay to assist in monitoring sedimentation depth. o The forebay shall be sized to contain 0.1 inch of runoff per impervious acre of contributing area. The forebay shall be a minimum o f 2 feet deep with the top of the associated berm being no more than 0.5’ below the normal water level. The volume in the forebay counts towards the total water quality volume requirements of the BMP if it is above the normal water level. As an alternati ve, the forebay may be designed to meet a sediment trapping efficiency of 60 percent. • Construction Specifications: Construction specifications shall conform to the l atest version of SCDOT’s Standard Specifications for Highway Construction (2007). 3.10.1 Detention and Retention Requirements Detention practices are essential for providing inc reased storage within a stormwater management system. The storage of stormwater flows by these structures helps provide water quality protection and reduces peak flows. Designs of storage facilities used for stormwater flow rate control and required downstream analyses shall be submitted as part of the engineering calculations. Requirements that shall be applied to detention practices include the following: • Discharge Velocities: Post-development discharge velocities shall be reduced to provide non- erosive flow velocities from structures, channels, or other control measures, or equal the pre- development 10 percent AEP, 24-hour storm event flo w velocities, whichever is less. Refer to Table 3-4 for maximum non-erosive flow velocities. • Impoundment / Freeboard Requirements: o Ponds with vegetated embankments shall be less tha n 15 feet in height and shall have side slopes (inside and outside) no steeper than 3H :1V. Embankments protected with turf reinforcement mats (TRM) may be used but shal l be no steeper than 2H:1V. Geotechnical slope stability analysis is required for slopes greater than 10 feet in height and embankments that have steeper slopes than those indicated above. Access inside a pond shall be provided with at least one side slo pe at 3H:1V or flatter for maintenance. o A minimum freeboard of 0.5 feet above the 1 percen t AEP, 24-hour design storm high water elevation shall be provided for all impoundments. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-29 3.10.2 Detention-Specific Requirements Stormwater detention facilities are used to reduce the peak discharge and capture runoff for a short period of time. Detention facilities should b e designed to completely drain or return to a normal pool elevation after a design storm has pass ed. Requirements specific to detention facilities include: • Limits of Detention Pool : Any detention storage capacity shall clearly iden tify the limits and depths of the expected detention pool on the construction plan set. • Recovery Time : The detention volume from detention facilities sh all be drained within 0.10 feet of the normal water surface elevation from the structure within 72 hours or a second storm event analysis can be performed to show the detenti on facilities still have 0.5 feet of available freeboard. The storm being analyzed for this requirement is the 4 percent AEP storm event for all projects not located in the Church Creek Basin which requires the 1 percent AEP storm event for analysis (see section 3.6.3 for specific Church Creek Basin requirements). • Pond Requirements : The bottom of detention facilities shall be grade d towards the outlet structure(s) to prevent standing water conditions in dry facilities and to facilitate draining of wet facilities to perform maintenance. The bottom slope shall be a minimum of 0.5 percent. 3.10.3 Wet Detention-Specific Requirements Wet stormwater detention facilities contain a perma nent pool of water and are primarily implemented to promote water quality treatment. The maximum depth of wet detention facilities with a permanent pool shall be determined by site conditions, design constraints, and environmental needs. The facility shall prov ide a permanent pool of water with a depth sufficient to discourage weed and mosquito growth without creatin g undue potential for anaerobic bottom conditions. A depth of 3 to 8 feet is reasonable unless County Mosquito Control requirements dictate otherwise. Ae ration or other means shall be used as necessary to prevent anaerobic conditions. • Aquatic Bench : A minimum 10-foot-wide aquatic bench around the p erimeter of the wet stormwater detention facility (with exception of th e forebay area) with the inside edge of the shelf 6” below the permanent pool level and the out side edge 6” above the permanent pool level with a resulting slope of 10H:1V must be provided when site area is greater than 2 acres. With half the shelf below the water and half the sh elf above the water, the vegetated shelf will provide a location for an appealing diverse populat ion of native, emergent wetland vegetation that enhances biological pollutant removal, provides a habitat for wildlife, protects the shoreline from erosion, promotes ecological mosquito control (i.e., attracts a variety of predator insects for natural mosquito control) and improves sediment trapping efficiency. The wet stormwater detention facility must incorpor ate several (minimum of three (3)) diverse native species of shallow water emergent and shall land herbaceous vegetation on the vegetated shelf. A minimum of 50 plants per 200 sf of shelf area shall be planted. Diversity in species increases the robustness of the vegetated s helf by increasing the chances that some species will service minor changes in the permanent pool water level. This vegetation enhances pollutant removal, protects the shoreline from eros ion, and increases safety by discouraging people from entering the basin. Planting density is dependent on the targeted time to full coverage, and on the individual selected species’ mature size. Spacing must be approximately 24” to 36” centers; yielding coverage in approximat ely 1-2 years respectively. On the tops of City of Charleston Stormwater Design Standards Manu al Design Requirements 3-30 berms and on the exterior slopes of containment ber ms, maintain turf grass in access areas; Vegetation selection information can be found in Section 3.15.2. 3.10.4 Infiltration Requirements Infiltration BMPs are encouraged at all sites and m ay be required on those sites that do not currently discharge stormwater runoff, have no exis ting outlet, or are in special protection areas (e.g., Church Creek Basin). The following other cri teria, based primarily on South Carolina Regulation 72-307.C requirements, shall be followed in the design of infiltration systems: • Areas draining to these facilities shall be stabil ized and vegetative filters established prior to runoff entering the system. Infiltration devices sh all not be used if a suspended solids filter system does not accompany the practice. If vegetati on is the intended filter, there shall be at least a 20-foot length of vegetative filter prior t o sheet flow stormwater runoff entering the infiltration practice. Forebays or other engineered devices for sediment removal are also required. • Each system shall be designed to prevent clogging by fine material and for ease of maintenance. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-31 • The bottom of the infiltration practice shall be a t least 0.5 feet above the seasonal high water table, whether perched or regional, determined by direct piezometer measurements, which can be demonstrated to be representative of the maximum height of the water table on an annual basis during years of normal precipitation, or by t he depth in the soil at which mottling first occurs as determined by an appropriately licensed individual. • The infiltration device shall be designed to compl etely drain of water within 72 hours. • Soils shall have adequate permeability to allow wa ter to infiltrate. Infiltration practices are limited to soils having an infiltration rate of at least 0.5 inch per hour. Initial consideration shal l be based on a review of the appropriate soil survey and proposed depths of excavation or field testing. The survey or testing may serve as a basis for rejection. Onsite soil borings and textural classifications shall be accomplished to verify the actual site and seasonal high water table conditions when infiltration is used. • Infiltration practices greater than 3 feet deep sh all be located at least 25 feet from basement walls. • Infiltration practices designed to handle runoff f rom any parking areas or commercial properties shall be a minimum of 150 feet from any public or private water supply well. • The design of an infiltration practice shall have a properly sized overflow or bypass for larger storm events. Measures to provide a non-erosive vel ocity of flow along its length and at the outfall shall also be included as necessary. Additional control devices will typically be necessary prior to a release to a watercourse to meet water quality requirements. • The slope of the bottom of the infiltration practi ce shall not exceed 5 percent. • An infiltration practice shall not be installed on or atop a slope whose natural or existing angle of incline exceeds 20 percent. • If an underdrain system is required, clean-outs sh all be provided at a minimum every 100 feet along the infiltration practice to allow for access and maintenance. • If sod is proposed in areas counted towards stormw ater infiltration, calculations or product certifications shall be provided to ensure the sod bedding does not hinder site specific infiltration requirements. 3.11 Equalization Pipes and Submerged Systems The City acknowledges that in some cases equalizati on pipes and submerged systems may be an appropriate solution. Due to maintenance concerns these will be limited and require a design exception. Design requirements are in Section 3.4.6.1 and design exception instructions are in Section 4.10 . 3.12 Accepted Permanent Structural and Non-Structur al Best Management Practices Permanent structural BMPs are those practices that remain after the project has been closed out. Permanent structural BMPs typically fall into two categories: water quantity (runoff retention for a City of Charleston Stormwater Design Standards Manu al Design Requirements 3-32 design rainfall depth) and water quality. Permanent structural quantity BMPs accepted by the City are listed in Table 3-7. Table 3-7. Structural BMPs for Water Quantity and/o r Quality BMP Description Water Quantity Water Quality Bioretention Areas – Rain Gardens, Stormwater Planters, Tree Boxes Bioretention areas are shallow stormwater basins or landscaped areas that use engineered soils and vegetation to capture and treat stormwater runoff. Runoff may be returned to the conveyance system through an underdrain or exfiltrated into the soil. + + Permeable Pavement Systems Permeable pavement systems are pavement surfaces that promote infiltration of stormwater through gaps in the pavement to an underlying course of gravel and then to an underdrain or underlying soils resulting in a reduced volume of runoff. + Stormwater Infiltration - Infiltration Trenches and Basins Infiltration practices are shallow excavations that are filled with stone or engineered soil that allow stormwater runoff to enter and exfiltrate through the adjoining soils or through an underdrain. + Green Roofs Green roofs are roofs where engineered soil media a nd vegetation is installed on all or a portion of the surface area. Green roofs reduce the impervious area and the volume of stormwater runoff. + Rainwater Harvesting Rainwater harvesting is the practice of collecting and beneficially reusing rainwater. Typically, this is limited to rainwater runoff from roofs. + Impervious Surface Disconnection Runoff from a rooftop, driveway, or other small impervious surface is directed to a pervious surface or practice to provide infiltration, filtering, or reuse. Disconnection practices are intended to reduce the volume of runoff created by impervious surfaces. + Open Channel Systems – Grass Channel and Dry Swale Vegetated open channels with amended soils or suitable soils for infiltration that are explicitly designed and constructed to capture, route, and infiltrate stormwater runoff. + Site Reforestation Site reforestation is planting trees on a site. The trees capture rainfall in their leaves and uptake infiltrated water through their roots to reduce stormwater runoff volumes. + + Open Channel Systems – Wet Swale and Two Stage Ditches Stormwater conveyance systems that provide water quality benefits through filtration and pollutant uptake. + Stormwater Filtering Systems: Perimeter Sand Filter Perimeter sand filters are multi-chamber structures designed to treat stormwater runoff through filtration using a sand bed as its primary filter media. Filtered runoff may be returned to the conveyance system. + City of Charleston Stormwater Design Standards Manu al Design Requirements 3-33 BMP Description Water Quantity Water Quality Dry Detention Ponds Dry detention ponds are constructed stormwater basins that are dry between rain events. Runoff from each rain event is detained and treated in the basin, and released at a designed rate. + Wet Detention Ponds Wet detention ponds are constructed stormwater basins that have a permanent pool, shallow marsh, or micropool of water. Runoff from each rain event is detained and treated in the pool, and released at a designated rate. + + Stormwater Wetlands Stormwater wetlands are natural or constructed systems used for stormwater management. Stormwater wetlands consist of a combination of shallow marsh areas, open water and semi-wet areas above the permanent water surface. + Vegetated Filter Strip A vegetated buffer, or filter strip, is a uniformly graded and densely vegetated area that treats sheet flow stormwater runoff. The vegetation in the buffer works to slow down the stormwater runoff, settling and filtering some pollutants and uptaking others. + Underground Detention Underground detention is used as an alternative to surface dry-detention basins. They are used in areas that are space-limited where there is not adequate land to provide the required detention volume. The underground storage uses tanks, vaults, and buried pipes to supply the required storage volume. + Manufactured Treatment Devices: Vortex Separator Baffles Cartridges Skimmers Gravity Oil-Grit Separator Filter Material Inlet Inserts Pre-fabricated controls use the movement of stormwater runoff through a specially designed practice to remove target pollutants. They are typically used on smaller commercial sites and urban hotspots. There are numerous commercial vendors of these practices, but there is limited data on their performance. Until further research is done and substantial removal efficienci es are published, these structures may require monitoring. + + Regardless of the structural control used, maintena nce schedules shall be included for each proposed BMP. Maintenance schedule is included on t he grading and drainage details sheet of the construction plan set. Listed below are some permanent non-structural BMPs that shall be considered for use in larger construction, development, and redevelopment projects. • Buffers : an area along a shoreline, wetland, or other waterway where development is restricted or prohibited. The primary function of the buffer is to physically protect and separate a stream, lake, or wetland from future disturbance or encroachment. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-34 • Disconnected Roof Drains : directing stormwater runoff from rooftops towards pervious areas where it is allowed to filter through vegetation an d other landscaped material and infiltrate into the soil. • Cluster Development : concentrate development away from environmentally sensitive areas such as streams, wetlands, mature wooded areas, and steep slopes. • Education Materials: literature for owners and homeowner’s associations to educate themselves on the impact they can have on water qua lity and the activities necessary to maintain structural controls. These efforts are par ticularly critical in low impact development (LID) designs. 3.12.1 Bioretention Basins Bioretention basins are shallow depressional areas (18 to 36 inches deep) that are filled with an engineered soil media and are planted with trees, shrubs, and other herbaceous vegetation. They are an effective practice to reduce post-constructi on stormwater runoff rates, volumes, and pollutant loads. They also provide several other be nefits, including improved aesthetics, wildlife habitat, urban heat island mitigation, and improved air quality. These BMPs are either a Tier I or Tier II practice depending upon whether the practice has an underdrain. Bioretention basins are designed to capture, infilt rate, and evapotranspire stormwater runoff. However, if the soils do not percolate as much as d esired, an underdrain can be installed, so at least the stormwater runoff is temporarily stored before being conveyed back into the storm drain system through an underdrain. However, the underdra in must have an upturned elbow that induces subsurface infiltration in the submerged (French) drain but allows excess flow to progress to receiving drainage system. The engineered soil media is comprised of sand, soil, and organic matter. The City requires the design, installation, and mai ntenance requirements for bioretention basins to be as outlined in Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014). Bioretention basins designed and installed in the City shall also meet the following criteria: • An observation well shall be provided to allow eas y monitoring of the water level within the practice. The observation well shall be a 6-inch pe rforated PVC pipe with a removable and lockable cap. 3.12.2 Permeable Pavement Systems Permeable pavement allows the stormwater to infiltrate through the pavement into a rock storage layer under the pavement. Examples of permeable pav ement include porous asphalt, pervious concrete, and permeable pavers. Pervious concrete i s designed without any “fine” material, resulting in a gap-graded mixture with high void sp ace. Porous asphalt is similar to pervious concrete and consists of an open-graded surface course. Permeable pavers consist of individual concrete or stone shapes that are placed adjacent to one another, but with gaps all around, over a specially designed sub-base. These BMPs are either a Tier I or Tier II practice depending upon whether the practice has an underdrain. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-35 The critical aspect of permeable pavement systems is application. They can be very effective, but not when they are placed in areas where they will r egularly receive runoff concentrated with mulch, leaf litter, grass clipping, etc. This organic matter will plug the void spaces in the pavement and restrict the infiltration that can occur. The City requires the design, installation, and maintenance requirements for permeable pavement system to be as outlined in Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014). Permeable pavement systems designed and installed in the City shall also meet the following criteria: • Permeable pavement systems shall be designed to co mpletely drain within 72 hours. • The proportion of drainage area to permeable pavem ent footprint should be less than 10:1. • An observation well shall be provided to allow eas y monitoring of the water level within the practice. The observation well shall be a 6-inch pe rforated PVC pipe with a removable and lockable cap. 3.12.3 Infiltration Trenches/Basins Infiltration trenches/basins are shallow excavated areas that receive stormwater. Infiltration trenches/basins are suitable for sites with limited space, reduce the volume of stormwater runoff and peak flows, are appropriate for small sites (less than 5 acres), provide infiltration and pollutant filtration, and work well with other BMPs in series. These BMPs are either a Tier I or Tier II practice depending upon whether the practice has an underdrain. Infiltration trenches/basins are applicable for a v ariety of uses such as the perimeter of parking areas or medians between drive lanes. They can also be applicable for sites with limited space available for water quality features. There are a variety of ways these structures can be designed but must include pretreatment. Infiltration trenche s/basins can receive overland flow from a forebay through gravel or grass. They can also receive point flow from a proprietary water quality unit that drains to the aggregate filter media. The City requires the design, installation, and mai ntenance requirements for infiltration trenches/basins to be as outlined in Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014). 3.12.4 Green Roofs Green roofs are roofs of buildings that have a waterproof membrane overlaid with planting media and vegetation including plants, shrubs, or trees. Green roofs capture and absorb rainwater, resulting in decreased stormwater runoff. Green roo fs provide more than a stormwater benefit, such as reducing rooftop temperatures, creating urban habitats, and enhancing outdoor gathering spaces. These BMPs are a Tier I practice and qualify for a curve number reduction (see worksheet in Appendix C). City of Charleston Stormwater Design Standards Manu al Design Requirements 3-36 All buildings must have the structural capacity to hold a green roof. Extensive green roofs use less than 6 inches of planting media, whereas inten sive green roofs use greater than six inches of planting media. Rooftop applications will vary based on structural capacity of the building. It is important to consider the maintenance requirements, leak detection systems or tray systems, planting plans (using plants with minimal irrigation requirements), and replacement of green roof layers. The City requires the design, installation, and maintenance requirements for green roofs to be as outlined in Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014). 3.12.5 Rainwater Harvesting Rainwater harvesting is the practice of capturing and temporarily storing rainwater, typically from rooftops, in a cistern or rain barrel for beneficial use. The beneficial use often includes landscape watering but may include water for flushing toilets (contact City for regulations regarding reuse of rainwater), make-up water for HVAC units and boiler s, and water for vehicle washing. These BMPs are typically a Tier I practice. Rainwater harvesting can be used in most land use p ractices, including high-density residential, commercial, institutional, and industrial areas. Considerations for rainwater harvesting include the distance of the harvested rainwater from its intended use, water treatment requirements that may limit use of harvested rainwater, storage of harves ted rainwater below ground versus above ground, seasonal use, and decrease in potable water usage. The City requires the design, installation, and maintenance requirements for rainwater harvesting to be as outlined in Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014). 3.12.6 Impervious Surface/Roof Disconnection The goal of downspout disconnection is to allow sto rmwater from impervious surfaces to run across pervious surfaces to be treated and infiltra ted. For new SFR construction or redevelopment, it is prohibited to connect downspou ts to the stormwater system. When disconnecting impervious surfaces/roofs from the st ormwater system or allowing impervious surfaces to be directed to pervious surfaces, the d esigner needs to consider the proximity of adjacent buildings, the direction of downspout conveyance after disconnection, and the routing of disconnected downspouts to other BMPs or pervious surfaces. The City requires the design, installation, and mai ntenance requirements for impervious surface/roof disconnection to be as outlined in Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014). City of Charleston Stormwater Design Standards Manu al Design Requirements 3-37 3.12.7 Open Channel Systems – Grass Channel and Dry Swale Grass channels and dry swales are long, shallow sto rmwater basins (typically 4 to 18 inches deep) that mimic the ecological functions of a natural landscape. Dry swales are similar to linear bioretention areas. These open channel systems can be flexible in design to accommodate landscape requirements and can be used to retrofit the natural or design landscape, reduce the volume of stormwater runoff, provide infiltration, provide filtration, provide groundwater recharge, and are suitable for runoff from highly impervious areas. These BMPs are either a Tier I or Tier II practice depending upon whether the practice has an underdrain. The City requires the design, installation, and maintenance requirements for grass channels and dry swales to be as outlined in Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014). 3.12.8 Site Reforestation Site reforestation is a practice in which an impervious area is retrofit with or replaced (entirely or in part) with a combination of vegetation and trees . This reduces the impervious area and consequently reduces the peak stormwater runoff flo ws and overall stormwater volume that discharges from a site. These BMPs are typically a Tier I practice and qualify for a curve number reduction (see worksheet in Appendix C). Site reforestation promotes infiltration; reduces t he heat island effect, soil erosion, and stream temperatures; and can provide bank stabilization. W hen evaluating the feasibility of site reforestation, consideration should be given to land development code standards, a combination of site reforestation with other BMPs, the use of site reforestation as a visual buffer or a part of a filter strip, soil conditions, and the type of trees/vegetation proposed. The method for incorporating trees into runoff reduction calculations shall be in accordance with the Green Infrastructure Center Case Study “Trees t o Offset Stormwater – Case Study 04: Charleston, South Carolina” (2018) and the associated calculator tool. 3.12.9 Stormwater Filtering Systems - Perimeter San d Filter Sand filters are shallow, excavated areas that rece ive stormwater through overland flow or a perforated inlet pipe. The stormwater runoff flows through the sand bed and into the underdrain filtering and treating stormwater pollutants. These BMPs are typically a Tier IV practice, but may be a Tier II. A pretreatment device or forebay is required to fil ter large sediment and debris before entering the filter to prevent clogging. Sand filters are ap plicable for a wide variety of uses such as the perimeter of parking areas or medians between drive lanes. They can also be applicable for sites with limited space available for water quality features. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-38 The City requires the design, installation, and maintenance requirements for stormwater filtering systems to be as outlined in Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014). 3.12.10 Dry Detention Practices – Dry Ponds Dry detention basins or dry ponds are surface stora ge facilities intended to provide temporary storage of stormwater runoff and to release it at a designed flow rate to reduce downstream water quantity impacts. These practices contain a forebay for capturing the heavier sediment and floatables and are designed to completely drain to a dry condition within 72 hours. These BMPs are a Tier III practice. If the practice can infilt rate significant amounts of stormwater runoff, then the practice should be treated as a bioretention basin. Dry ponds require a significant footprint and are b est suited for drainage areas greater than 10 acres. Dry ponds also do not reduce the overall sto rmwater runoff volume and provide less pollutant removal than other practices. The City requires the design, installation, and mai ntenance requirements for dry ponds to be as outlined in Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014). Dry ponds designed and install ed in the City shall also meet the following criteria: • Dry ponds must retain the water quality volume req uired for Tier III and release it over 24 to 72 hours, unless the pond is in an identified flood-prone area. 3.12.11 Wet Pond Water quality wet ponds are similar to standard ext ended wet detention ponds, except they contain an aquatic bench along the perimeter of the pond just below the normal pool level and possibly other plantings above the normal pool elevation (safety bench) in the extended detention portion of the pond that provide water quality benefits and detain the stormwater runoff for a slow release over at least 24-hours and no more than 72 hours. The vegetation helps provide water quality benefits. These BMPs are a Tier III practice. Wet ponds improve water quality by biological uptak e and filtering of native plants, sediment settling, including attached pollutant, and detenti on of stormwater. Wet ponds have a relatively high removal rate for many pollutants, increase bio diversity by providing habitats for wildlife and aquatic life, reduce channel/streambank erosion by reducing the number of bankfull events, and provide an opportunity for multiple use areas, including active and passive recreation. Wet ponds may require complying with South Carolina dam regul ations, have a large space requirement, present possible safety concerns with a pool of water (fence may be required), and are not to be used in high groundwater areas. The City requires the design, installation, and maintenance requirements for wet ponds to be as outlined in Low Impact Development in Coastal South Carolina: A Planning and Design Guide City of Charleston Stormwater Design Standards Manu al Design Requirements 3-39 (Ellis et al. 2014). Wet ponds designed and install ed in the City shall also meet the following criteria: • Extended detention above the normal pool elevation shall be based on the 2.8 inch, 24-hour storm per Tier III requirements. • The aquatic bench should contain plantings to aid in the treatment of the stormwater runoff. Plant selection can be found in Section 3.15.2 . 3.12.12 Stormwater Wetlands Constructed wetlands incorporate marsh and pool are as to temporarily store stormwater runoff, treat pollutants, and create habitat. Constructed w etlands are generally shallow, except for the pool areas, and contain dense native aquatic vegeta tion, typically covering 50 percent of the surface area, that help treat the stormwater. Wetland systems can store runoff, provide extended detention, or incorporate the benefits of a pond in a pond/wetland system. Stormwater wetlands should detain the stormwater runoff for a slow rele ase over at least 24-hours and no more than 72 hours. These BMPs are a Tier III practice. Constructed wetlands improve water quality through biological uptake through native plants and biodegradation by microorganisms, sediment settling , adsorption, and other chemical/physical processes. Wetlands also increase biodiversity by p roviding habitat for aquatic and wildlife species and provide an opportunity for multiple use s including passive recreation. Wetlands typically require larger tracts of land, need a regular flow of water (so stormwater runoff may need to be supplemented during dry conditions), and need to be properly designed and managed to reduce the potential to breed mosquitoes. Water qua lity of the discharge can also change with seasonal growth of plantings. The City requires the design, installation, and maintenance requirements for stormwater wetlands to be as outlined in Low Impact Development in Coastal South Carolina: A Planning and Design Guide (Ellis et al. 2014). Stormwater wetlands designed and installed in the City shall also meet the following criteria: • Extended detention above the normal pool elevation shall be based on the 2.8 inch, 24-hour storm per Tier III requirements. 3.12.13 Vegetated Filter Strip A vegetated filter strip is a uniformly graded and densely vegetated area that treats and infiltrates stormwater runoff. The vegetation in the filter str ip works to slow down the stormwater runoff, settling and filtering some pollutants and uptaking others. The stormwater runoff volume can also be reduced by infiltration into the pervious soil, if available, and by absorption and evapotranspiration of the vegetation. For a vegetat ed filter strip to be effective, the stormwater has to enter and flow through the buffer in sheet f low. A vegetated buffer can be managed or unmanaged depending on the desired aesthetics. City of Charleston Stormwater Design Standards Manu al Design Requirements 3-40 Often a vegetated filter strip is used as prelimina ry treatment of the stormwater prior to entering another permanent stormwater BMP; however, if the soils are suitable, it can be a Tier I practice. 3.12.13.1 Vegetated Filter Strip Feasibility Criter ia The following feasibility criteria shall be considered when designing a vegetated filter strip: • Sheet Flow: A vegetated filter strip should receive stormwater runoff from an upstream impervious area and through sheet flow it is able t o treat the runoff and, if the soils allow, infiltrate some of the stormwater runoff volume. Fo r the filter strip to be effective, the runoff needs to enter and flow through the entire strip length in sheet flow. Uniform grading within the strip is required to maintain the sheet flow throughout the strip. • Depth to Water Table: The designer must ensure a standard separation dist ance of at least 0.5 feet between the seasonal

Text truncated. Open the original for the full document.

Source: City of Charleston website. First collected Nov 7, 2026.