DRB Meeting Results
City of Charleston · Berkeley County · meeting of Mar 2, 2026 · Agendas
Open the original document More from City of Charleston
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CITY OF CHARLESTON
DESIGN REVIEW BOARD
MEETING RESULTS
MARCH 2, 2026 4:30 P.M. 2 GEORGE STREET
BOARD MEMBERS PRESENT: Erin Stevens, Lucas Boyd, Ashley Jackrel, Adriana Carson,
Bill Eubanks
STAFF MEMBERS PRESENT: David Meeks, DRB Administrator; Brad Thomas, Staff Architectural
Planner; Patrick Carlson, City Clerk Office
A. APPLICATIONS
1. Crown Commons Way off Maybank Hwy.
Johns Island | Council District 3 | TMS# 313-00-00-584, 585 | DRB2026-000311
Requesting conceptual approval for three, 3-story multi-family buildings. This is the next
phase of an existing development.
Owner: Crowne at Live Oak Sq. Phase II LLC
Applicant: Spencer Plowden/SeamonWhiteside
DECISION: DEFERRED
MOTION: Conceptual deferred due to architectural direction. Generally, consider the
Board and staff comments made at the meeting.
MADE BY: Boyd SECOND: Eubanks VOTE: FOR: 5 AGAINST: 0
2. 2274 Clements Ferry Rd.
Cainhoy | Council District 1 | TMS# 267-00-00-148 | DRB2026-000312
Requesting preliminary approval for a new 3-story storage building.
Owner: Holly McAlhany
Applicant: Holly McAlhany
DECISION: APPROVED
MOTION: Preliminary approval with final review by the Board, and with staff comments
1-5, and Board comments to refine the articulation of materials/material
changes on the facades. (Where there is a material change, there should be a
plane change) Per Board discussion.
MADE BY: Boyd SECOND: Eubanks VOTE: FOR: 5 AGAINST: 0
Continued on Page 2
Design Review Board
Meeting Results | March 2, 2026 Page 2
A-2: 2274 Clements Ferry Rd. (continued):
STAFF COMMENTS:
1. A previous Board comment was to simplify the plant pallet but the plant pallet is the
same as the last meeting, except two plants were added (Red Cedar and Jasmine)
2. Staff comment #1 from the last meeting asked the applicants to return the tower
cornices into the building further so one cannot see the ends from the ground. The
applicants refers in a note to the roof plan for evidence this was addressed, but we
did not have a roof plan at the last review to compare this one too, and the ends of
the towner cornice (and the end of the wall the cornice sits on top of) looks to be the
same in the renderings. Staff recommends the parapet and wall be restudied and
extended further into the roof a few feet.
3. A comment made by a Board member at the last review in reference to “study the
cornice” was not addressed, and staff feels it was a good recommendation: to
deemphasis the thickness of the tower cornice opposite the main entrance on the front
facade, so that the tower over the main entrance is the thickest cornice which
emphasizes the entrance.
4. A staff comment was made at the last meeting to provide a detail for the front metal
grill for the climbing vines. A verbal description of 3” tube steel was given but we
need to see a physical detail. 3” tube steel sounds too thick for vines to grab onto.
How far apart are the vertical tubes? Perhaps cables should be added horizontally to
aid the climbing vines, plus reduce the thickness of the vertical tubes.
5. The submittal requirements checklist ask that the applicant provides the elevations from
the last meeting to review and compare the progress. The applicants have provided
elevations from several meetings past, which are not helpful. Staff has provided the
previous elevations.
B. MINUTES
1. Review of Minutes from the January 5, 2026 Meeting
DECISION: APPROVED
MOTION: Minutes approved
MADE BY: Jackrel SECOND: Eubanks VOTE: FOR: 5 AGAINST: 0
2. Review of Minutes from the February 2, 2026 Meeting
DECISION: APPROVED
MOTION: Minutes approved
MADE BY: Jackrel SECOND: Eubanks VOTE: FOR: 5 AGAINST: 0
Source: City of Charleston website. First collected Nov 7, 2026.