RecordWell Data

_04062026-2164

Town of Mount Pleasant · Charleston County · meeting of Apr 6, 2026 · Minutes

Open the original document More from Town of Mount Pleasant

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

TOWN OF MOUNT PLEASANT, SC TRANSPORTATION COMMITTEE Monday, April 6, 2026 2:15 p.m. Municipal Complex, Council Chambers 100 Ann Edwards Lane, Mount Pleasant, SC 29464 MINUTES Members Present: Mayor Will Haynie, Howard Chapman, Mik e Tinkey, Kathryn Whitaker Staff Present: Brad Morrison, Eric DeMoura, James Aton Transportation Committee Presentation Listen to the Transportation Committee Meeting Here 1. Call to order Mayor Haynie called the meeting to order at 3:19 pm. 2. Approval of Minutes from the March 2, 2026 meeting Mr. Chapman moved for approval of the minutes; motion seconded by Mr. Tinkey. Motion carried unanimously. 3. Public Comments Ed Trevisani, 1192 Sha rpestowne Court, President of Porchers Preserve at Oakland Homeowners Association , spoke on behalf of his community regarding safety concerns related to the SC 41 bypass project and the Billy Swails Boulevard 4B extension project. He emphasized that the combined impact of these projects would create unsafe conditions for residents ente ring and exiting their community, citing Federal Highway Administration guidance. Mr. Trevisani outlined three critical concerns: unsafe entry and exit conditions due to the planned 3-lane, 45 mph roadway Transportation Committee April 6, 2026 Page 2 of 8 configuration requiring drivers to cross over 85 feet including two lanes, sidewalk, and a 28-foot median; lack of safe pedestrian and bike crossing at Porchers Bluff Road and Morgan's Point near a major shopping center; and limited visibility due to commu nity signage placement. He requested the formation of a joint Mount Pleasant-Charleston County task force to develop solutions with community representation. Thomas Goodwater, 1173 South Shadow Drive , requested assistance with installing speed bumps in his neighborhood. He expressed frustration with speeding vehicles and drivers who ignore stop signs, citing safety concerns for his children and grandchildren. Mr. Goodwater noted that police enforcement provides only temporary relief and that collecting petition signatures has been challenging due to transient residents and safety concerns when approaching homes. 4. Budget Review FY 2027 a. Engineering and Development Services General Fund Operating Expenditures b. Engineering and Development Services Capital Fund Projects and Expenditures Mr. DeMoura presented the Engineering Development Services (EDS) budget. The budget proposes a 0.4 percent reduction for the next fiscal year without any reduction in services or new positions. The overall decrease is primarily attributed to current fiscal year contractual services that are not necessary in the proposed budget. Transportation Committee April 6, 2026 Page 3 of 8 Mr. DeMoura highlighted key contractual services on page 72, specifically noting funding to implement the Safety Action Plan and item number 10, which covers survey traffic counts and traffic studies in neighborhoods. He also referenced Capital Improvement Projects, including Town access management, additional funding for the Stockdale Drive section, and a project exploring enhancements at Patriots Point for roadways and additional parking, though that project has not yet started. Mr. DeMoura drew attention to page 117 in the capital asset fund section, emphasizing that the budget proposes $2,500,000 for pavement preservation in the next fiscal year. Mr. Chapman moved to recommend approval of the Engineering and Development Services budget as presented by staff to the Budget Committee; motion seconded by Ms. Whitaker. Motion carried unanimously. 5. Discussion regarding Porchers Preserve at Oakland neighborhood vehicle ingress and egress Mr. Aton provided background information on the concerns raised by the Porchers Preserve neighborhood. Staff have been working with the HOA for several months to address concerns and coordinate with Charleston County's design team for the Highway 41 widening project. The neighborhood currently has two access points: a right -in, right -out access on Billy Swails Boulevard (an access-controlled roadway by design for safety and operational efficiency) and a full access point on South Morgan's Point Road with a left turn lane and median refuge. Transportation Committee April 6, 2026 Page 4 of 8 As part of the Highway 41 widening project, Charleston County proposes to widen Porchers Bluff Road to two lanes while maintaining the left turn lane into the neighborhood. The project will also install the Mount Pleasant Way, a 10-foot shared-use path along Porchers Bluff Road from the existing path on Billy Swails to the Kenny Mile Trail connection. Mr. Aton clarified that the intersection of South Morgan's Point Road does not meet the warrants for a traffic signal, as confirmed by both the County's team and SCDOT review. However, discussions are underway regarding an unsignalized pedestrian crossing with Rectangular Rapid Flashing Beacon (RRFB) devices, like those at Houston Northcutt Boulevard, which appears favorable for implementation. Committee members discussed various aspects of the project. Mr. Chapman sought clarification on the 80 -foot crossing distance mentioned in public comments, with staff explaining that the actual crossing involves two 12-foot lanes (24 feet total) plus the median refuge area. The stop bar will be moved approximately 20 feet further into the neighborhood to comply with M ount Pleasant Way crossing requirements, but once clear of pedestrians, vehicles can proceed into the crosswalk area for better sight distance. Mr. Tinkey inquired about lighting in the area, with staff confirming that additional street lighting and downlighting from the RRFB devices themselves are being considered as part of the design. The Committee discussed traffic patterns, noting that the planned signal at Porchers Bluff Road and Billy Swails Boulevard will provide traffic gaps and facilitate access to the neighborhood via Billy Swa ils. Staff expressed Transportation Committee April 6, 2026 Page 5 of 8 confidence that this signalization will occur as part of the Highway 41 project or the Billy Swails widening project if timelines don't align. Committee members noted that the right -in, right-out configuration on Billy Swails will help prevent cut-through traffic, as drivers will likely take the path of least resistance using the signalized intersection rather than navigating through the neighborhood. Staff confirmed they would provide updates next month on the RRFB progress, signalization timeline, and any signage modifications required at the community entrance. 6. Update – ongoing projects a. Traffic Management update to include beach traffic plan and possible expansion of service Mr. Aton provided highlights of ongoing transportation projects, noting several initiatives moving to the construction phase. M ount Pleasant Way improvements along Mathis Ferry Road at Von Kolnitz Road will begin near the Senior Center in the coming weeks, and Harry Hallman Boulevard pedestrian improvements at Waterfront Park featuring RRFB installations are also proceeding to construction this month. The Billy Swa ils Boulevard 4B project is scheduling the preconstruction meeting with Gulfstream Construction and local SCDOT staff for Local Public Agency requirements, with construction potentially beginning next month. Safe Streets and Roads for All (SS4A) projects remain under design, with a Town Transportation Forum scheduled for April 30 , 2026, at Town Hall to Transportation Committee April 6, 2026 Page 6 of 8 review all projects and gather input for Safety Action Plan updates required this year. The Park West Boulevard/Stockdale Street Roundabout project continues through right -of-way acquisition and design review processes. The 516 Coleman project is undergoing SCDOT permit revisions to remove underground storage components and better align with Capital Improvement Program budget requirements. Several Mount Pleasant Way projects are under design, with the Kenny Mile Trial out to bid following a well-attended mandatory preconstruction meeting with over 10 contractors. Multiple sidewalk improvement projects are progressing, with Lazy Lane likely beginning construction in April. The Center Street Extension sidewalk has been completed, and numerous other sidewalk sections are under design. Ms. Whitaker inquired about the traffic signal at Highway 17 and the Snee Farm entrance, which Mr. Aton confirmed remains part of the S S4A intersection improvements. The project is in design, with a preliminary design completed and a field meeting with consultants scheduled to progress SCDOT review. Mayor Haynie followed up on a public comment made by Ms. Goodwater regarding traffic safety in the Hickory Shadows neighborhood, directing staff to return in May with a report outlining alternative solutions since the standard speed hump application failed. Transportation Committee April 6, 2026 Page 7 of 8 Mr. Aton explained that while the neighborhood met the speed requirement (85th percentile above 30 mph), it fell short of the petition requirement, obtaining only 35 of the signatures needed from approximately 80 homes. The applicant has mobility issues that have hindere d signature collection efforts. Mr. Morrison noted this situation is atypical, as they usually encounter the opposite problem of having sufficient petitions but not meeting speed criteria. Staff has budgeted funds for the project and suggested giving the neighborhood additional time to compl ete the petition process, with Committee members offering to assist with neighborhood outreach. For beach traffic management, Mr. Aton reported that signal timing adjustments for higher volume periods to and from Isle of Palms and Sullivan's Island have been implemented for several weeks, with weather determining optimal activation timing. The Committee continues funding Coastal Beach Transportation Services, and emergency beach evacuation signal timing remains available for rapid implementation through their traffic signal contractor. Mayor Haynie noted that ridership projections are pending for adding Friday services to the existing Saturday and Sunday beach shuttle service. This expansion would nearly double M ount Pleasant's current $10,000 contribution to approximately $18,000. Mr. Haynie expressed a cautious approach, preferring to review effectiveness data before committing to avoid jeopardizing the entire program over cost concerns for the additional day. Transportation Committee April 6, 2026 Page 8 of 8 7. Adjourn There being no further business, the meeting was adjourned at 3:49 pm. Respectfully submitted by, Cathy Godsey April 8, 2026

Source: Town of Mount Pleasant website. First collected Nov 7, 2026.