TOWN OF MOUNT PLEASANT, SC
TRANSPORTATION COMMITTEE
Monday, April 6, 2026
2:15 p.m.
Municipal Complex, Council Chambers
100 Ann Edwards Lane, Mount Pleasant, SC 29464
MINUTES
Members Present: Mayor Will Haynie, Howard Chapman, Mik e Tinkey,
Kathryn Whitaker
Staff Present: Brad Morrison, Eric DeMoura, James Aton
Transportation Committee Presentation
Listen to the Transportation Committee Meeting Here
1. Call to order
Mayor Haynie called the meeting to order at 3:19 pm.
2. Approval of Minutes from the March 2, 2026 meeting
Mr. Chapman moved for approval of the minutes; motion seconded by Mr.
Tinkey. Motion carried unanimously.
3. Public Comments
Ed Trevisani, 1192 Sha rpestowne Court, President of Porchers
Preserve at Oakland Homeowners Association , spoke on behalf of his
community regarding safety concerns related to the SC 41 bypass project
and the Billy Swails Boulevard 4B extension project. He emphasized that the
combined impact of these projects would create unsafe conditions for
residents ente ring and exiting their community, citing Federal Highway
Administration guidance. Mr. Trevisani outlined three critical concerns:
unsafe entry and exit conditions due to the planned 3-lane, 45 mph roadway
Transportation Committee
April 6, 2026
Page 2 of 8
configuration requiring drivers to cross over 85 feet including two lanes,
sidewalk, and a 28-foot median; lack of safe pedestrian and bike crossing at
Porchers Bluff Road and Morgan's Point near a major shopping center; and
limited visibility due to commu nity signage placement. He requested the
formation of a joint Mount Pleasant-Charleston County task force to develop
solutions with community representation.
Thomas Goodwater, 1173 South Shadow Drive , requested assistance
with installing speed bumps in his neighborhood. He expressed frustration
with speeding vehicles and drivers who ignore stop signs, citing safety
concerns for his children and grandchildren. Mr. Goodwater noted that police
enforcement provides only temporary relief and that collecting petition
signatures has been challenging due to transient residents and safety
concerns when approaching homes.
4. Budget Review FY 2027
a. Engineering and Development Services General Fund Operating
Expenditures
b. Engineering and Development Services Capital Fund Projects and
Expenditures
Mr. DeMoura presented the Engineering Development Services (EDS)
budget. The budget proposes a 0.4 percent reduction for the next fiscal year
without any reduction in services or new positions. The overall decrease is
primarily attributed to current fiscal year contractual services that are not
necessary in the proposed budget.
Transportation Committee
April 6, 2026
Page 3 of 8
Mr. DeMoura highlighted key contractual services on page 72, specifically
noting funding to implement the Safety Action Plan and item number 10,
which covers survey traffic counts and traffic studies in neighborhoods. He
also referenced Capital Improvement Projects, including Town access
management, additional funding for the Stockdale Drive section, and a
project exploring enhancements at Patriots Point for roadways and additional
parking, though that project has not yet started.
Mr. DeMoura drew attention to page 117 in the capital asset fund section,
emphasizing that the budget proposes $2,500,000 for pavement
preservation in the next fiscal year.
Mr. Chapman moved to recommend approval of the Engineering and
Development Services budget as presented by staff to the Budget
Committee; motion seconded by Ms. Whitaker. Motion carried unanimously.
5. Discussion regarding Porchers Preserve at Oakland neighborhood
vehicle ingress and egress
Mr. Aton provided background information on the concerns raised by the
Porchers Preserve neighborhood. Staff have been working with the HOA for
several months to address concerns and coordinate with Charleston
County's design team for the Highway 41 widening project.
The neighborhood currently has two access points: a right -in, right -out
access on Billy Swails Boulevard (an access-controlled roadway by design
for safety and operational efficiency) and a full access point on South
Morgan's Point Road with a left turn lane and median refuge.
Transportation Committee
April 6, 2026
Page 4 of 8
As part of the Highway 41 widening project, Charleston County proposes to
widen Porchers Bluff Road to two lanes while maintaining the left turn lane
into the neighborhood. The project will also install the Mount Pleasant Way,
a 10-foot shared-use path along Porchers Bluff Road from the existing path
on Billy Swails to the Kenny Mile Trail connection.
Mr. Aton clarified that the intersection of South Morgan's Point Road does
not meet the warrants for a traffic signal, as confirmed by both the County's
team and SCDOT review. However, discussions are underway regarding an
unsignalized pedestrian crossing with Rectangular Rapid Flashing Beacon
(RRFB) devices, like those at Houston Northcutt Boulevard, which appears
favorable for implementation.
Committee members discussed various aspects of the project. Mr. Chapman
sought clarification on the 80 -foot crossing distance mentioned in public
comments, with staff explaining that the actual crossing involves two 12-foot
lanes (24 feet total) plus the median refuge area. The stop bar will be moved
approximately 20 feet further into the neighborhood to comply with M ount
Pleasant Way crossing requirements, but once clear of pedestrians, vehicles
can proceed into the crosswalk area for better sight distance.
Mr. Tinkey inquired about lighting in the area, with staff confirming that
additional street lighting and downlighting from the RRFB devices
themselves are being considered as part of the design.
The Committee discussed traffic patterns, noting that the planned signal at
Porchers Bluff Road and Billy Swails Boulevard will provide traffic gaps and
facilitate access to the neighborhood via Billy Swa ils. Staff expressed
Transportation Committee
April 6, 2026
Page 5 of 8
confidence that this signalization will occur as part of the Highway 41 project
or the Billy Swails widening project if timelines don't align.
Committee members noted that the right -in, right-out configuration on Billy
Swails will help prevent cut-through traffic, as drivers will likely take the path
of least resistance using the signalized intersection rather than navigating
through the neighborhood.
Staff confirmed they would provide updates next month on the RRFB
progress, signalization timeline, and any signage modifications required at
the community entrance.
6. Update – ongoing projects
a. Traffic Management update to include beach traffic plan and possible
expansion of service
Mr. Aton provided highlights of ongoing transportation projects, noting
several initiatives moving to the construction phase. M ount Pleasant Way
improvements along Mathis Ferry Road at Von Kolnitz Road will begin near
the Senior Center in the coming weeks, and Harry Hallman Boulevard
pedestrian improvements at Waterfront Park featuring RRFB installations
are also proceeding to construction this month.
The Billy Swa ils Boulevard 4B project is scheduling the preconstruction
meeting with Gulfstream Construction and local SCDOT staff for Local Public
Agency requirements, with construction potentially beginning next month.
Safe Streets and Roads for All (SS4A) projects remain under design, with a
Town Transportation Forum scheduled for April 30 , 2026, at Town Hall to
Transportation Committee
April 6, 2026
Page 6 of 8
review all projects and gather input for Safety Action Plan updates required
this year.
The Park West Boulevard/Stockdale Street Roundabout project continues
through right -of-way acquisition and design review processes. The 516
Coleman project is undergoing SCDOT permit revisions to remove
underground storage components and better align with Capital Improvement
Program budget requirements.
Several Mount Pleasant Way projects are under design, with the Kenny Mile
Trial out to bid following a well-attended mandatory preconstruction meeting
with over 10 contractors.
Multiple sidewalk improvement projects are progressing, with Lazy Lane
likely beginning construction in April. The Center Street Extension sidewalk
has been completed, and numerous other sidewalk sections are under
design.
Ms. Whitaker inquired about the traffic signal at Highway 17 and the Snee
Farm entrance, which Mr. Aton confirmed remains part of the S S4A
intersection improvements. The project is in design, with a preliminary design
completed and a field meeting with consultants scheduled to progress
SCDOT review.
Mayor Haynie followed up on a public comment made by Ms. Goodwater
regarding traffic safety in the Hickory Shadows neighborhood, directing staff
to return in May with a report outlining alternative solutions since the
standard speed hump application failed.
Transportation Committee
April 6, 2026
Page 7 of 8
Mr. Aton explained that while the neighborhood met the speed requirement
(85th percentile above 30 mph), it fell short of the petition requirement,
obtaining only 35 of the signatures needed from approximately 80 homes.
The applicant has mobility issues that have hindere d signature collection
efforts.
Mr. Morrison noted this situation is atypical, as they usually encounter the
opposite problem of having sufficient petitions but not meeting speed criteria.
Staff has budgeted funds for the project and suggested giving the
neighborhood additional time to compl ete the petition process, with
Committee members offering to assist with neighborhood outreach.
For beach traffic management, Mr. Aton reported that signal timing
adjustments for higher volume periods to and from Isle of Palms and
Sullivan's Island have been implemented for several weeks, with weather
determining optimal activation timing. The Committee continues funding
Coastal Beach Transportation Services, and emergency beach evacuation
signal timing remains available for rapid implementation through their traffic
signal contractor.
Mayor Haynie noted that ridership projections are pending for adding Friday
services to the existing Saturday and Sunday beach shuttle service. This
expansion would nearly double M ount Pleasant's current $10,000
contribution to approximately $18,000. Mr. Haynie expressed a cautious
approach, preferring to review effectiveness data before committing to avoid
jeopardizing the entire program over cost concerns for the additional day.
Transportation Committee
April 6, 2026
Page 8 of 8
7. Adjourn
There being no further business, the meeting was adjourned at 3:49 pm.
Respectfully submitted by,
Cathy Godsey
April 8, 2026