Bids and Purchases Committee
Monday, March 2, 2026
Municipal Complex, Council Chambers
100 Ann Edwards Lane, Mount Pleasant, SC 29464
Minutes
Click here to listen to recording
Powerpoint Presentation
1. Call To Order
T
he Bids and Purchases Committee meeting was called to order on
Monday, March 2, 2026, at 9:00 a.m. Council Member Daniel
Brownstein opened the meeting with a moment of silence, specifically
requesting that participants keep in mind American service members
overseas fighting in the war against Iran. Council Members Alex Crosby
and Mike Tinkey were present.
2. A
pproval Of Minutes from The February 2, 2026 Meeting
A motion to approve the minutes from the February 2, 2026, meeting
was made by Council Member Crosby, seconded by Council Member
Tinkey. The motion carried 3-0.
3. Public Comments
Council Member Brownstein opened the floor for public comments.
There were no public comments.
4. Award Of A Contract For The Construction Of Billy Swails
Boulevard – Section 4B
Chief Financial Officer Tammy Harness presented the bid
recommendation for Billy Swails Boulevard Section 4B construction.
Staff requested bids from SCDOT prequalified bidders for roadway
construction on new alignment beginning at the intersection of
Sweetgrass Basket Parkway and 6 Mile Road and ending at Billy Swails
Boulevard and Hamlin Road. The project is funded partially through
federal grant award LPA-02-17 from the South Carolina Department of
Transportation and Federal Highway Administration, requiring SCDOT
award concurrence.
Bids & Purchases
March 2, 2026
Page 2
The construction scope includes clearing and grubbing, grading,
stormwater drainage, asphalt paving, sidewalk, curb and gutter
construction, landscaping, traffic signals, street lighting, and irrigation.
The total project length is 1.4 miles of new alignment roadway with a
545-calendar day construction timeline from notice to proceed.
Staff received eight bids and determined Gulfstream Construction
Company Inc. was the lowest, most responsive, and SCDOT
prequalified bidder. The Town received SCDOT award concurrence on
February 24th. Staff recommended contracting with Gulfstream
Construction Company for $18,762,575.87.
Motion to approve the contract award to Gulfstream Construction
Company was made by Council Member Tinkey; seconded by Council
Member Crosby.
Deputy Director James Aton, from Engineering Development Services,
provided additional project details, describing this as a momentous day
for the Town of Mount Pleasant, as the project will finally complete the
third north-south route through Mount Pleasant. The roadway has been
nearly a decade in the making and will provide a massive addition to the
transportation network in an area that sees little other opportunity for
traffic diversion during incidents or Boone Hall events.
Following award, the contractor will go through a protest period, then
participate in a preconstruction meeting to outline contract requirements
and provide a work schedule within the 540-calendar day period. The
project includes a tree walk to identify any additional trees within the
right-of-way that can be saved beyond what's shown in the plans, as well
as a 10-foot Mount Pleasant Way shared use path.
Council Member Tinkey emphasized the importance of connectivity and
requested that the Town develop a comprehensive communication plan
for adjacent neighborhoods. Mr. Aton confirmed that communications
plans are in place to reach established HOAs and residents through
email, social media, and the Town's project page. He noted that work will
primarily be during daytime hours, with possible nighttime work at
intersections toward the project's end. Council Member Tinkey
requested additional signage and direct mailings to affected residents,
which Mr. Aton agreed to provide.
The motion carried 3-0.
5. Award Of A Contract For The David Simmons Jr. Community
Dock Repairs
Bids & Purchases
March 2, 2026
Page 3
Ms. Harness presented the bid recommendation for David Simmons Jr.
Community Dock repairs. Staff requested bids from qualified bidders to
repair the community dock by removing and replacing damaged
structural components, reusing existing decking where feasible, and
performing related hardware and connection repairs. Bid alternates
included full decking replacement options and remediation methods. All
work must be completed within 120 calendar days from notice to
proceed.
Staff received eight bids but determined the low bidder was
nonresponsive due to lacking the required marine license. After
reviewing remaining bidders, staff determined Rakes Building and
Maintenance Contractors LLC, doing business as Blutide Marine
Construction, was the lowest, most responsive, and responsible bidder
for the base bid. Staff reviewed three add alternates and determined it
was in the Town's best interest to award the base bid plus add alternate
3.
Staff recommended contracting with Rakes Building and Maintenance
Contractors for the base bid amount of $286,870 plus add alternate 3
with unit pricing of $600 per unit of Denso Seashield 90 and $825 per
unit of Denso Seashield 400 materials to construct the project.
Motion to approve the contract award was made by Council Member
Tinkey; seconded by Council Member Crosby.
Public Services Director, Andy Weis explained that repairs were
identified through the Town's yearly bridge and dock inspection program.
The work involves removal or replacement of damaged timber framing,
hardware connection repairs, and deteriorating piles. The existing Ipe
decking is in good condition and will be reused, eliminating alternates 1
and 2 which would have used pine boards or Trex-type materials.
Adding alternate 3 provides unit pricing for pile remediation since the
extent of damage won't be known until work begins the estimated cost is
unknown. Alternate 3 has different pricing for less damaged piles ($90)
versus more severely damaged piles ($400).
Council Member Tinkey inquired about timeline and public notification.
Mr. Weis estimated the work would take one to two months once
awarded, with coordination through social media and direct
communication with surrounding residents. The project includes
improvements to parking and grounds around the dock to make it more
user-friendly, and the dock will be closed during construction.
The motion carried 3-0.
Bids & Purchases
March 2, 2026
Page 4
6. Award Of A Contract For The Re-Bid Of Harry Hallman Blvd And
Von Kolnitz Road Pedestrian Improvements
Ms. Harness presented the rebid recommendation for pedestrian
improvements on Harry Hallman Jr. Boulevard and Von Kolnitz Road.
For Harry Hallman Jr. Boulevard, the project scope includes removal of
limited asphalt and curb, milling, installation of three concrete base table
crosswalks, pedestrian ramps, signage, pavement markings, rectangular
rapid flashing beacons, and sidewalk improvements.
For Von Kolnitz Road, the scope includes approximately 1,160 feet of
new concrete sidewalk, construction of pedestrian ramps, 1,400 feet of
stained concrete pavement, asphalt paving, installation of reinforced
concrete pipe culverts, drainage structures, thermoplastic pavement
markings, tree removal, and tree protection.
Staff received three bids and determined that Braetr Construction was
the lowest, most responsive, and responsible bidder. Staff
recommended contracting with Braetr Construction for $727,627 to
construct the pedestrian improvements.
Council Member Tinkey moved to approve the contract award; seconded
by Council Member Crosby.
Mr. Aton explained that both projects are county CTC and TST funded,
which is why they were rebid as a package. The Harry Hallman
improvements focus on pedestrian safety and traffic calming through
raised table crossings with pedestrian-actuated rectangular rapid
flashing beacons at three consolidated crossing locations near Memorial
Waterfront Park.
The Von Kolnitz Road improvements are part of Mount Pleasant Way by
the senior center, implementing stained concrete to better delineate
pedestrian uses from parking and roadways. The project connects down
Von Kolnitz to the school, addressing currently disjointed sidewalk
connectivity, and makes the final gap connection that was lost during
previous roadway improvement projects.
Council Member Tinkey praised the effectiveness of pedestrian-
activated flashers on Mathis Ferry Road and inquired about tree
replacement. Mr. Aton confirmed that due to limited replanting
opportunities in the heavily paved area near the condos, the Town will
pay into the tree mitigation bank as required by ordinance. Council
Member Tinkey expressed hope that the tree task force would find
effective locations for tree planting using mitigation funds.
Bids & Purchases
March 2, 2026
Page 5
Regarding timeline, Mr. Aton anticipated both projects would move
quickly, with an estimated 300-day contract duration. He noted that
roadway components would be prioritized for quick completion to
minimize road closure impacts. The work should not necessitate any
closure of Memorial Waterfront Park.
The motion carried 3-0.
7. Adjourn
The meeting was adjourned at 9:17 a.m.
Respectfully submitted by,
Gina Artrip
March 2, 2026