RecordWell Data

Backup Material

Oconee County · Oconee County · meeting of Sep 2, 2025 · Minutes

Open the original document More from Oconee County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summa ries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. PROCUREMENT - AGENDA ITEM SUMMARY OCONEE COUNTY, SC COUNCIL MEETING DATE: September 2, 2025 ITEM TITLE: Title: INMAR Rigid Hull Dive / Rescue Boat Department(s): Emergency Services Amount: $89,520.91 FINANCIAL IMPACT: Procurement was approved by Council in Fiscal Year 2025-2026 budget process. Budget: $89,520.91 Project Cost: $89,520.91 Balance: $0.00 Finance Approval: ________________________________ (Funding from Emergency Services Capital Equipment / Vehicle Fund (335)) BACKGROUND DESCRIPTION: This rescue boat is a INMAR Dive/Rescue 670R, a 21-foot rigid hull inflatable equipped with a 175hp Suzuki motor. It includes essential features like GPS, emergency lighting, seating, a front tow post, and a trailer—making it well- suited for fast, efficient response. This boat will be a valuable addition to the Emergency Services fleet, offering a lightweight, rapid-response option ideally suited for the lakes in Oconee County. It is especially well-suited for Lake Jocassee, where sudden and severe storm events frequently develop with little to no warning. This boat would significantly enhance our emergency response capabilities by allowing crews to launch quickly, reach victims faster, and facilitate efficient recovery operations. While our current fleet includes reliable response boats, they are somewhat limited by their design. This V-hull boat offers greater stability and improved handling in choppy water conditions compared to the flat-bottom or pontoon boats we currently operate. Its speed and maneuverability make it ideal for delivering responders swiftly to the scene, allowing triage and life-saving care to begin without delay. The Fleet Maintenance Director also approves this purchase. SPECIAL CONSIDERATIONS OR CONCERNS: The County is utilizing the Sourcewell contract through a cooperative purchasing agreement. Sourcewell contracts are competitively solicited and awarded on a national level. The Sourcewell contract allows all County Agencies to purchase from this contract, directly from the awarded vendors. All Hands Fire Equipment, LLC has been awarded Sourcewell Contract No. 020124-ALH for Firefighter Equipment and Rescue Tools. Through this cooperative purchasing agreement, the County is receiving a 5% discount off the manufacturer’s suggested retail price (MSRP $59,995.00) for the boat. Additional equipment and accessories are not subject to the discount. ATTACHMENT(S): 1. Sourcewell Contract 020124-ALH Information 2. Sourcewell Contract Pricing / Discount Sheet 3. All Hands Fire Equipment, LLC Quote Number EST45468 STAFF RECOMMENDATION: It is the staff’s recommendation that Council approved the purchase of a INMAR Dive / Rescue 670R – 21-foot rigid hull inflatable boat to All Hands Fire Equipment of Wall, NJ in the amount of $89,520.91, per Sourcewell Contract No. 020124-ALH Submitted or Prepared By:_______________________________Approved for Submittal to Council: ___________________________________ Tronda C. Popham, Procurement Director Amanda F. Brock, County Administrator *Volume Discount criteria are based on annual total order volume All Hands Fire Equipment LLC Contract #020124-ALH Firefigh(ng Equipment and Rescue Tools with Related Supplies and Accessories Vendor Sourcewell Discount % off of List / MSRP Sourcewell Volume Discount* 343 Fire 10% 15% AB Inflatables 5% 10% Achilles 5% 10% Affordable Drill Towers 5% 10% Akron Brass 20% 25% Alco-Lite 5% 10% Altek 10% 15% Anderson Rescue Solutions 10% 15% Bridgehill 20% 25% Bulldog Hose Company 10% 15% CET Fire Pumps 5% 10% Chemguard 30% 40% Chief's Choice 5% 10% Circul-Air (Lockers & Storage) 10% 15% CMC 10% 15% Coffee Ostrich 5% 10% Duo-Safety 5% 10% ECO CAF 5% 10% eFireX 5% 10% Eflare 5% 10% Elkhart 20% 25% EMI 20% 25% Empire Scientific 20% 25% Fire Hooks Unlimited 5% 10% Fire Innovations 10% 15% FireCraft Safety 5% 10% Firewipes 5% 10% First Look / Agility Technologies 5% 10% Force 6 10% 15% Gemtor 20% 25% Groves 5% 10% Husky Portable Containment 25% 30% Ice Rescue Systems 5% 10% Inmar 5% 10% Junkin Safety 10% 15% JYD Industries 5% 10% Key Hose 10% 15% *Volume Discount criteria are based on annual total order volume Vendor Sourcewell Discount % off of List / MSRP Sourcewell Volume Discount* Kochek 25% 30% Krisis Flood 20% 25% Li-Cell 5% 10% Li-fire 20% 25% LifeVac 5% 10% Little Giant 5% 10% Loadmaster 5% 10% Mad Rock 5% 10% MK Diamond 10% 15% National Foam 15% 20% Niedner / Altra 10% 15% Nightstick 5% 10% Obexion FR 5% 10% PAC / Peformance Advantage Company 5% 10% Perimeter Solutions / Solberg 15% 20% Petzl 20% 25% PIP 10% 15% Plug N Dike 10% 15% Power Hawk 5% 10% R&B Fabrications 10% 15% ResQtec 10% 15% Riptide / Hydra-Tap 5% 10% RIT Safety Solutions 10% 15% Site Drainer 5% 10% Skylotec 5% 10% SMC - Harken Rescue & Safety Brands 10% 15% Solis Lighting 10% 15% Steele Solutions 22% 26% Sterling Rope 20% 25% Streamlight 5% 10% Switlik 5% 10% Syntex Industries 25% 30% Tempest Technology / Bioex 5% 10% TNT Tools 25% 30% Tohatsu 5% 10% Tractel 5% 10% Tulmar 5% 10% Wagonway 5% 10% Whaly 5% 10% Wing Inflatabes Inc. 5% 10% All Hands Fire Equipment PO Box 1245 Wall NJ 07719 Tel:(732) 502 8060 Fax:(732) 502 8064 www.allhandsfire.com Quote Date 8/11/2025 Quote # EST45468 Bill To Oconee County Emergency Services 300 S. Church St. Walhalla SC 29691 Ship To Oconee County Emergency Services 15026 Wells Highway Seneca SC 29678 Shipping Code ...Ship Via FedEx Ground Orde... Sales Rep Colarusso, Scott T Expires 9/10/2025 Account #: 86847 Contract # Sourcewell 020124-ALH **We will try to match or beat any price** Item Name IMG-670R-DR IMG-PDI-LARGE IMG-GPS IMG-CREE-FRONT IMG-CREE-REAR IMG-STROBE IMG-RS IMG-FRONTTOW IMG-SHRINK-Large IMG-TRAILER AHF-TARIFF Qty. 1 1 1 1 1 1 1 1 1 1 1 Description INMAR Dive / Rescue 670R - 21‘ 10“ Orca Hypalon Rigid Hull Inflatable Boat With Suzuki 175hp Long Shaft Motor *Sourcewell 020124-ALH Equipment & Rescue Tools 5% Off List: $59,995.00* Inmar PDI Large RIBS (14‘ - 22’) *PRE DELIVERY INSPECTION - LARGE RIBS (14‘ - 22’) - FUEL 20 GALLONS - OPEN W ATER TEST ( 4 HOURS ) - OIL FILL / MAIN / LOWER - PREP FOR DIRECT CUSTOMER DELIVERY Lowrance - GPS / Chartplotter / Fishfinder Combo Cree Flood Lights Per Pair (installed) FRONT Cree Flood Lights Per Pair (installed) REAR Police / EMS Strobe Light Package Rear Seating (Installed) Front Tow Post (Only) Shrink Wrap for transport - Large 17‘ + Trailer Tariff *Quoted prices are subject to change if new or increased tariffs, duties, or import fees are imposed before delivery.* Options Size: Large Rate 56,995.... 750.00 1,764.74 882.99 882.99 3,000.00 2,145.00 1,400.00 500.00 5,499.94 11,700.... Amount 56,995.25 750.00 1,764.74 882.99 882.99 3,000.00 2,145.00 1,400.00 500.00 5,499.94 11,700.00 Subtotal Shipping Cost (FedEx Ground Orders Over $1000) Total 85,520.91 4,000.00 $89,520.91 EST45468 Please review your Estimate in great detail to ensure all items, qty., spec, etc. are correct. Please inform us asap if there is an error. Quoted prices are subject to change if new or increased tariffs, duties, or import fees are imposed before delivery. Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. PROCUREMENT - AGENDA ITEM SUMMARY OCONEE COUNTY, SC COUNCIL MEETING DATE: September 2, 2025 ITEM TITLE: Title: PO 56366 Goodwyn, Mills & Cawood, Inc. Department: Emergency Services Amount: PO 56366: $ 49,500.00 Change Order No. 1 Change Order 1: $124,000.00 Purchase Order Total: $173,500.00 FINANCIAL IMPACT: These services qualify for rei mbursement through FEMA Public Assistance, as well as other funding sources identified by Goodwyn, Mills and Cawood, Inc. The reimbursement amount will be based on expenses approved by FEMA; any expenses not approved will be the responsibility of Oconee County. BACKGROUND DESCRIPTION: On July 21, 2020 Council approved the award of RFP 19-10 for Consulting Services for Disaster Recovery and FEMA Public Assistance. This Award provides support to the County’s Disaster Recovery operations and FEMA Public Assistance preparation to expedite financial recovery and mitigation to minimize impacts from disasters. On October 10, 2024, Purchase Order No. 56366 was is sued to Goodwyn Mills and Cawood, Inc. for Task Order #5 related to Hurricane Helene. The purpose of this purchase order was to provide services in support of data collection and damage assessment/evaluation efforts in regards to Hurricane Helene, which led to the issuance of a federal d isaster declaration. The total amount authorized under this Task Orde r was not to exceed $49,500 without prior written approval from the Procurement Department. Change Order No. 1 to Task Order 5 includes • Project Formulation & Project Worksheet Preparations to include coordination of project worksheets and ver sions requir ed by SCEMD and FEMA including scope changes, appeals and assistance with all FEMA public assistance (PA) categories. • Project Worksheet preparations and Project Mitigation to include assistance to identify potential mitigation projects throughout the damaged area. Once projects are identified, GMC will provide an engineering cost estimate and develop the proper paperwork required to qualify FEMA 406 and SCEMD 404 mitigation funding for the project in accordance with the Master Contract. This request is for Council Approval for Change Order No. 1 to Goodwyn Mills and Cawood, Inc. in the amount of $ 124,000.00 for a total Award of $173.500.00 ATTACHMENT(S): 1. Goodwyn, Mills and Cawood, Inc. Task Order No. 5 Amendment No. 1 STAFF RECOMMENDATION: It is the staff’s recommendation that Council: 1. Approve Change Order No. 1, PO 56366, Work Authorization No. 5, Amendment No. 1, in the amount of 124,000.00, purchase order total $173,500.00 to Goodwyn, Mills and Cawood, Inc. for professional services related to Hurricane Helene FEMA reimbursement requests. 2. Authorize the County Administrator to execute documents for this change order. Submitted or Prepared By: _______________________________ Approved for Submittal to Council: __________________________________ Tronda Popham, Procurement Director Amanda F. Brock, County Administrator TASK ORDER NO. 5, Amendment 1 GMC Oconee County Page 1 of 2 The services to be provided under this Task Order shall be in accordance with the terms and conditions of the Master contract between GMC and Oconee County, dated April 20, 2020. This Task Order only authorizes the provision of the following services described below for Hurricane Helene. A separate Task Order is required to provide work on any other project. Any changes to payment terms must be authorized in writing. Verbal authorizations will not be binding. Scope of Work: GMC shall provide personnel to support Oconee Co. in the following key functional areas on an as needed basis:  Scoping and Planning: GMC shall work with the county to understand costs that are eligible for reimbursement, whether via FEMA, Insurance, HUD or from other sources of funding in accordance with the Master Contract.  Project Formulation & Project Worksheet Preparations: GMC will coordinate the development of project worksheets and versions as required by SCEMD and FEMA including scope changes, appeals, and assistance with all FEMA public assistance (PA) categories in accordance with the Master Contract in accordance with the Master Contract.  Project Mitigation: GMC will work with the county to identify potential mitigation projects throughout the damaged area. Once projects are identified, GMC will provide an engineering cost estimate and develop the proper paperwork required to qualify FEMA 406 and SCEMD 404 mitigation funding for the project in accordance with the Master Contract. It is anticipated that the quantity of personnel required for each position will vary at different stages of the project. GMC will assess the quantity of personnel being provided and will adjust staffing levels as necessary. Any adjustments to staffing levels will be determined by GMC. Compensation: On October 10, 2024, Oconee County issued Purchase Order No. 56366 with a Not to Exceed amount of $49,500.00 to GMC to initiate the FEMA evaluation process. During this time, GMC has worked closely with both County staff, FEMA staff, and State staff to evaluate damage that impacted Oconee County during Hurricane Helene. During this time, the GMC staff has been able to identify $3,488,267.57 in damages that will be submitted to FEMA for reimbursement. GMC is requesting an increase to the Purchase Order in the amount of $124,000.00 for total compensation of $173,500. This amount will be compensated for the position and hours of services furnished multiplied by the rate listed in the Master Contract. GMC Consulting shall not exceed a total cost of one hundred seventy- three thousand five hundred ($173,500.00) dollars for all project-related labor. This amount will fall within the 5% Direct Administrative Cost reimbursable by FEMA. Non-labor expenses shall be billed as follows: 1) Travel expenses including airfare and car rental shall be invoiced at cost, without mark-up; 2) lodging shall be invoiced up to the per diem rate according to GSA rates; 3) Meals and incidentals shall be invoiced at the GSA per diem rate (no receipts are required); 4) mileage shall be invoiced at the federal published rate; 5)Other non-labor expenses as may be applicable to the project and preapproved by GMC and the county shall be invoiced at cost, without mark-up. Due to uncertain nature of the scope of the work, scale and duration, the Not-To-Exceed value reflected in the Task Order is not guaranteed, but only a current estimate of the level of effort expected of GMC. Client: Oconee County Effective Date: August 25, 2025 Prime: Goodwyn Mills & Cawood Inc. (GMC) Estimated End Date: August 30, 2026 Project: Consulting Services Hurricane Helene Subcontract Type: Time and Materials (T&M) FEMA PA #: DR-4829-SC Location: Oconee Co. South Carolina TASK ORDER NO. 5, Amendment 1 GMC Oconee County Page 2 of 2 Invoicing: GMC shall invoice Oconee Co. for services rendered in accordance with the Master Contract. Each invoice shall reference the above Project Number. Acceptance: OWNER: CONSULTANT: OCONEE COUNTY GOODWYN MILLS CAWOOD‚ LLC. Name:___________________________ Name: ____________________ Title:____________________________ Title: _EVP, Disaster Recovery________________ Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. AGENDA ITEM SUMMARY OCONEE COUNTY, SC COUNCIL MEETING DATE: __ 09/02/2025_________ COUNCIL MEETING TIME: _____6:00 PM____ ITEM TITLE: [Brief Statement] Council authorization to reimburse expenditures related to costs associated with the completion of Sewer South Wastewater Expansion Project Phase II from proceeds of the Series 2023 General Obligation Bond for expansion to the I-85 Corridor, in the amount of $3,385,903. BACKGROUND DESCRIPTION: In September 2023, Oconee County Council approved the issuance of $25,000,000 General Obligation Bond (Series 2023) to finance the design, acquisition, construction, installation, equipping, and rehabilitation of various capital sewer infrastructure projects. These include wastewater system improvements, related equipment, and other infrastructure projects essential to County operations. The County has incurred a total cost of $7,169,279 associated with this specific infrastructure expansion. Upon the completion of the project, calculations were established as follows: $1,783,376 in refund from the OJRSA for required matching funds; and allocated the previously approved ARPA expenditure in the amount of $2,000,000. There remains $3,385,903 from County funds expended for this phase of Sewer South. SPECIAL CONSIDERATIONS OR CONCERNS: [only if applicable] The bond proceeds are designated for eligible expenses or reimbursing previously incurred costs, as authorized by Council. FINANCIAL IMPACT: ATTACHMENTS - Spreadsheet summarizing eligible expenditures. - CSI Report / Account Details STAFF RECOMMENDATIONS: Staff recommends approval of this reimbursement request in the amount of $3,385,903. Submitted or Prepared By: Approved for Submittal to Council: __________________________ _____________________________________ Department Head/Elected Official Amanda F. Brock, County Administrator Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. PROCUREMENT - AGENDA ITEM SUMMARY OCONEE COUNTY, SC COUNCIL MEETING DATE: September 2, 2025 ITEM TITLE: Procurement #: RFP 25-03 Title: Financial Auditing Services Department: Finance Amount: $66,000.00 FINANCIAL IMPACT: Procurement was approved by Council in Fiscal Year 2025-2026 budget process. Budget: $80,000.00 Project Cost: $66,000.00 Balance: $14,000.00 Finance Approval: ______________________________ BACKGROUND DESCRIPTION: This Request for Proposal was issued to select a firm of Independent Certified Public Accountants to provide auditing and consulting services to Oconee County beginning with the audit of the 2024-2025 fiscal year. Under South Carolina law, Oconee County must provide an independent annual audit of all financial records and transactions of the County to be made by a Certified Public Accountant (or firm of such accountants) which has no personal interest, direct or indirect, in the fiscal affairs of the County or its officers. On August 14, 2025 formal sealed proposals were opened. A total of thirty-five (35) firms were notified of this solicitation opportunity, and four (4) firms submitted proposals. An evaluation committee comprised of County Staff reviewed and scored the submissions. Following the evaluation, the committee recommended CKH CPA’s & Advisors, LLC of Atlanta, GA, for the award. ATTACHMENT: 1. Summary Score Sheet STAFF RECOMMENDATION: It is the staff’s recommendation that Council: 1. Approve the award of RFP 25-03, Financial Auditing Services, to CKH CPA’s & Advisors, LLC of Atlanta, GA, in the amount of $66,000.00. 2. Authorize the County Administrator to renew this contract for up to four (4) one-year terms, as long as the amount does not exceed the amount budgeted for this service, and the services provided are satisfactory. Submitted or Prepared By:_______________________________Approved for Submittal to Council: ___________________________________ Tronda C Popham, Procurement Director Amanda F. Brock, County Administrator RFP 25-03 Open Date: August 14, 2025 @ 2:00pm Bidders CKH Group Mauldin & Jenkins Perry & Associates, LLC Love Bailey & Associates, LLC Evaluator 1 487.50 442.50 345.00 302.50 Evaluator 2 345.00 345.00 285.00 287.50 Evaluator 3 412.50 385.00 210.00 200.00 Evaluator 4 410.00 395.00 227.50 205.00 Evaluator 5 487.50 400.00 355.00 360.00 TOTAL RANKING 2142.50 1967.50 1422.50 1355.00 RANKING 1 2 3 4 AVERAGE SCORE 428.50 393.50 284.50 271.00 AVERAGE RANKING 1 2 3 4 Finacial Auditing SCORES Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. ADMINISTRATION - AGENDA ITEM SUMMARY OCONEE COUNTY, SC COUNCIL MEETING DATE: September 2, 2025 ITEM TITLE: Title: Request for Council’s approval to commit matching funds in the amount of $124,256.00 toward the Federal Aviation Administration (FAA) Grant Offer for Airport Improvement Program (AIP) Project No. 3-45-0016-037-2025 and $25,845.00 toward the (FAA) Infrastructure Investment and Jobs Act (IIJA) - Airport Infrastructure Grant (AIG) Project No. 3 -45-0016-038-2025 for a total of $150,101.00, pending receipt of the official FAA Grant Award letters and to Authorize the County Administrator to accept and execute all necessary Grant documents pertaining to the Taxiway Pavement Rehabilitation Construction Project. FINANCIAL IMPACT: The total cost for the Taxiway Pavement Rehabilitatio n Construction Project is approximately $6,004,051.00. The Federal Aviation Administration (FAA) has agreed to fun d ninety-five percent (95%) of the eligible project costs, up to $5,703,849.00, pending receipt of the official Grant Award letters . Oconee County will provide a local matching share of two and a half percent ( 2.5%) approximately $150,101.00. The remaining two and a half percent (2.5) , also totaling $150,101.00, will be contributed by the South Carolina Aeronautics Commission (SCAC). BACKGROUND DESCRIPTION: On February 1, 2022, Council approved the award of RFP 21-08 for Professional Engineer and Consulting Services for the Oconee County Airport to W.K. Dickson & Company, Inc., of Columbia SC for a five -year term for services, as needed. In August 2024, W.K. Dickson merged with Ardurra Group, Inc., all future work will be carried out under the Ardurra Group name. • On May 5, 2023, Oconee County submitted a Taxiway Pavement Rehabil itation (Design/Bid) Project Application to the Federal Aviation Administration (FAA) for funding consideration under the Airport Improvement Program (AIP) and the Airport B ipartisan Law (BIL) / Airport Infrastructure Grant (AIG) programs. • On July 31, 20 23, Oconee County received Federal Avi ation Administration (FAA) Grant Offer under the Airport Improveme nt Program Grant (AIP) Project No. 3-45-0016-035-2023 and the Airport Bipartisan Law (BIL) / Airport Infrastructure Grant (AIG) Project No. 3-45-0016-036-2023 for the Taxiway Pavement Rehabilitation (Design/Bid) Project. • On August 15, 2023, Council approved the acceptance of Federal Aviation Administration (FAA) Airport Improvement Program (AIP) Grant Offer Project No. 3-45-0016-035-2023, the Airport Infrastructure Grant Off er Project No. 3-45-0016-036-2023 for the Taxiway Pavement Rehabilitation (Design & Bidding) along with matching funds. • On September 19,2023, Council approved the award of Work Authorization #2 (WA#2) to W.K. Dickson, now operating as A rdurra Group LLC., Work Authorization #2 included professional serv ices for project management, grant ad ministration, preliminary engineering, design services and plan preparation (civil and electrical) surveying, geotechnical investigations, engineering design, permitting, and bid phase services. • Ardurra Group Inc. (formally W.K Dickson) has completed 100% of the Taxiway Pavement Rehabilitation Design, bidding spec ifications, and plans. • On April 1, 2025 Council approved submittal of an Airport Improvement Program (AIP) and Airport Bipartisan Law (BIL) / Airport Infrastructure Grant (AIG) to the Fed eral Aviation Administration (F AA) as well as an application for fund ing to the South Carolina Aviation Association (SCAA) for the Airport Taxiway Pavement Rehabilitation Construction Project. The FAA Applications were officially submitted on July 3, 2025. The Oconee County Airport now wishes to accept the Federal Aviatio n Administration Airport Improvement Grant Project No. 3-45-0016-037-20205 and Infrastructure Investment and Jobs Act (IIJA) – Airport Infrastructure Grant (AIG) Grant Project No. 3- 45-0016-038-2025 for t he Taxiway Pavement Rehabilitation Construction Project. Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. SPECIAL CONSIDERATIONS OR CONCERNS: Oconee County has received an official FAA Grant Award Offer letter for IIJA/AIG Project No. 3-45-0016-038-2025 in the amount of $982,125.00 for the Taxiway Rehabilitation Construction Project. Airport Director, Mr. Jeff Garrison receiv ed notification from FAA stating the second award offer for Grant for AIP Project No. 3-45-0016-037-2025 is in process and should be released soon. Timely acceptance of these Grants is crucial to secure FAA funding for the Taxiway Pavement Rehabilitation Construction Project as the offers must be accepted and submitted to the Federal Aviation Administration no later than September 5, 2025. ATTACHMENT(S): 1. Federal Aviation Administration (FAA) IIJA/AIG Project No. 3-45-0016-038-2025 Grant Offer. 2. Federal Aviation Administration (FAA) AIP Project No. 3-45-0016-037-2025 Grant Agreement notification email. STAFF RECOMMENDATION: It is the staff’s recommendation to Council: 1. Authorize County Administrator to accept and execute all necessary documents pertainin g to Federal Aviation Adminis tration Airport Improvement Program (AIP) Grant Offer Project No. 3-45-0016-037-2025 and the Infrastructure Investment and Jobs Act (IIJA)-Airport Infrastructure Grant (AIG) Project No. 3-45-0016-038-2025 for the Taxiway Pavement Rehabilitation Construction Project. 2. Approve $150,101.00 in matching funds. Submitted or prepared by: _______________________________ Approved for Submittal to Council: __________________________________ Jeff Garrison, Oconee County Airport Director Amanda F. Brock, County Administrator Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. PROCUREMENT - AGENDA ITEM SUMMARY OCONEE COUNTY, SC COUNCIL MEETING DATE: September 2, 2025 ITEM TITLE: Procurement #: ITB 24-14 Title: Airport Taxiway Rehabilitation Department: Airport Amount: FAA 95%: $5,270,913.43 State 2.5%: $ 138,708.25 County 2.5%: $ 138,708.25 Project Award: $5,548,329.93 Contingency (15%): $ 832,249.49 Total Award: $6,380,579.42 FINANCIAL IMPACT: Procurement was approved by Council in Fiscal Year 25-26 budget process. Budget: $ 6,380,579.42 Project Cost: $6,380,579.42 Balance: $0.00 Finance Approval: (Funding from Federal Aviation Administration (FAA) - Airport Taxiway Pavement Rehabilitation Grant(s) 95%, South Carolina Aeronautics Commission (SCAC) 2.5%, Oconee County 2.5%) BACKGROUND DESCRIPTION: This construction contract consists of furn ishing all labor, materials and equipment needed for the Rehabilitation of the Parallel Taxiway Pavement at the Oconee County Regional Airport. The existing Taxiway pavement is beyond its usable l ife and rehabilitation is needed. This construction proje ct will consist of removing existing asphalt pavement and constructing new asphalt pavement throughout the parallel taxiway and connector taxiways located between the Taxiway and the Runway in accord ance with FAA design and construction requirements. This bid included f ive (5) different construction variations, each involving different areas and types of work. Bid packages were sh ared with FAA to determine what elements of the project would ultimately be selected for Funding. Based on prioritization of project needs and available FAA funding, Base Bid Schedule #1 - Rehabilitation of Taxiway A and Primary Connectors , Bid Additive #1 Demolition and Relocation of Taxiway 3, and Bid Alternate # 1 – Seal Coat of Taxilanes to Aprons Helo, 1, 2 & 3 have been selected for construction. On April 2 2, 2025, formal s ealed bids were opened. Twenty-two (22) companies were notified of this bid opportunity. Two (2) companies submitted bids with K west Group, LLC. Of Perrysburg, OH, submitting the lowest, responsive bid of $5,548,329.93. SPECIAL CONSIDERATIONS OR CONCERNS: Ardurra Group, LLC, formerly known as W. K. Dickson, assisted the County in preparing and submitting the grant application(s) requesting funding for this construction. The grant application(s) were submitted on July 3, 2025. On August 20, 2025 Oconee County Received Infrastructure Investment and Jobs Act (IIJA) – Airport Infrastructure Grant (AIG) Project No. 3-45-0016-038-2025. This approval request is contingent on receipt of the Grant Award Letter for Airport Improvement Program Grant (AIP) Project No. 3-45-0016-037-20205 from the FAA. The FAA will pay 95% ($5,270,913.43) of the actual construction costs; SCAC will pay 2.5% ($138,708.25); and the County will pay 2.5% ($138,708.25). If a change order is requested and approved by the FAA, the FAA will pay 95%, the SCAC will pay 2.5%, and the County will match 2.5% of said Change Order. The County is required to provide 2.5% match for this grant. This request includes a request for Council approval to commit matching funds in the amount of $138,708.25 for this project. (Approval to accept grant funding is included on this Council Agenda) ATTACHMENT(S): 1. Recommendation letter from Ardurra Group, LLC (formerly W. K. Dickson) 2. Official Bid Tab from Ardurra Group, LLC (formerly W.K. Dickson) Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. STAFF RECOMMENDATION: It is the staff’s recommendation that Council: 1. Approve the award of ITB 24-14 to Kwest Group, LLC., of Perrysburg, OH in the amount of $5,548,329.93, with a 15% contingency of $832,249.49, for a total award of $6,380,579.42, pending receipt of grant award. 2. Authorize the County Administrator to execute all necessary documents related to this project an d to approve any change orders within the approved contingency amount. Submitted or Prepared By: Approved for Submittal to Council: Tronda C. Popham, Procurement Director Amanda F. Brock, County Administrator 720 Corporate Center Drive | Raleigh, NC 27607 | 919.782.0495 | www.ardurra.com August 26, 2025 Ms. Amanda Brock, County Administrator Oconee County 415 South Pine Street Walhalla, SC 29691 RE: Oconee County Regional Airport Taxiway Pavement Rehabilitation WKD Project No. 20230970.00.RA Contract Award Recommendation Dear Ms. Brock, The bid packages submitted on April 22, 2025 for the Taxiway Pavement Rehabilitation project at the Oconee County Regional Airport have been reviewed a nd summarized on the enclosed Bid Tabulation. Two bid proposals were submitted by Kwe st Group, LLC (Kwest) and the Rogers Group, Inc. Bid packages provided pricing for various bid schedules including base bid work, bid additives and bid alternates. The bid packages were reviewed for completeness and accuracy and were shared with FAA to determine what elements of the project would ultimately be selected for funding. Based on prioritization of project needs and available FAA funding, Base Bid Schedule #1, Bid Additive #1 and Bid Alternate #1 have been selected for construction. For the selected project elements Kwest submitted a bid price of $5,548,349.93 and Rogers G roup Inc. submitted a price of $8,292,246.40. A breakdown of the project elements and prices is also shown below. Bid Element Kwest Group, LLC Rogers Group, Inc. Base Bid #1 Taxiway A Pavement Rehabilitation $4,74 4,002.73 $6,309,051.00 Bid Additive #1 Relocation of Taxiway A3 $732,422.2 0 $1,833,852.50 Bid Alternate #1 Seal Coat of Secondary Connectors $71,905.00 $149,342.90 Grand Total $5,548,329.93 $8,292,246.40 As of the date of this letter, Kwest has an active South Carolina general contractor license and is a pre-qualified SCDOT contractor. Kwest proposal includes a 0.9% Disadvantaged Business Enterprise (DBE) participation. This participation does not m eet the project goal, however documentation of good faith efforts spent towards meeting the project goal has been requested. 720 Corporate Center Drive | Raleigh, NC 27607 | 919.782.0495| www.ardurra.com Based on this information, we recommend that Oconee County award the subject contract in the amount of $5,548,329.93 to Kwest Group, LLC. We appreciate the opportunity to provide this service for Oconee County and the Oconee County Regional Airport, and we are available to answer any questions you may have. If you have any questions, please contact me at 919-782-0495. Sincerely, Ardurra Group Inc. Jason P. Kennedy, PE Project Manager enclosure cc: Jeff Garrison – Oconee County Regional Airport Melinda Cox – Oconee County Regional Airport Tronda Popham – Oconee County Taxiway Pavement Rehabilitation WKD NO. 20230970.00.RA OPENING DATE: 4/22/2025 TIME: 2:00 PM BID OPENING LOCATION: VIRTUAL & 415 South Pine Street Walhalla, SC 29691 BIDS OPENED BY: Tronda Popham ITEMS SELECTED FOR CONSTRUCTION ARE HIGHLIGHTED YELLOW A B C D E F g H I J CONTRACTOR LICENSE # and CLASSIFICATION ADDENDA #1 ACKNOWLEDGED SIGNED BID FORM BID BOND 5% DBE % BASE BID SCHEDULE #1 Rehab for TWY A & Primary Connectors BASE BID SCHEDULE #2 Rehab of Apron Connectors BASE BID TOTAL (SCHEDULES #1+2 ) Rehab of Twy A and all Connectors BID ADDITIVE #1 Demo and Replacement of Twy A3 - to address direct connect BASE BID SCH 1 AND 2 + BID ADDITIVE #1 Rehab of Taxiways and Relocation of Twy A3 BID ALTERNATE #1 Seal Coat of Secondary Connectors instead of Rehab BASE BID SCHEDULE #2 PRICE IF BID ALTERNATE #1 IS SELECTED BASE BID WITH BID ALTERNATE #1 SELECTED Rehab of TWY A primary Connectors and Seal Coat of Apron Connectors (Column A+G+F) BASE BID WITH BID ALTERNATE #1 SELECTED & BID ADDITIVE #1 Rehab of TWY A primary Connectors, Seal Coat of Apron Connectors & Relocation of Twy A3 BID ADDITIVE #2 Stub Out for Future Taxiway Extension Kwest Group LLC CLG 120118 Yes Yes Yes 0.09% $4,744,002.73 $1,890,199.34 $6,634,202.07 $732, 422.20 $7,366,624.27 $55,284.00 $16,621.00 $4,815,907.73 $5,548,329.93 $564,781.00 Rogers Group Inc. CLG 19294 Yes Yes Yes 3.080% $6,309,051.00 $3,339,949.00 $9,649,000. 00 $1,833,852.50 $11,482,852.50 $138,190.00 $11,152.90 $6,458,393.90 $8,292,246.40 $1,287,395.00 BID TABULATION SUMMARY BID TABULATION SHEET I Certify that this is a true and corrected OWNER: record of bids received. PROJECT: LOCATION: 415 South Pine Street Jason Kennedy Walhalla, SC 29691 Ardurra DATE: 22-Apr-25 Please note that items that have been bolded, highlighted and italicized are mathematical corrections. Firm: KWEST GROUP, LLC ROGERS GROUP, INC. Address: 8305 Fremont Pike 1880 S. Hwy 14 Perrysburg, OH 43551 Greer, SC 29650 License Number/Bid Bond GA License No. 120118 GA License No. 119294 BASE BID: SCHEDULE 1 - TAXIWAY A REHABILITATION 1 C-100 Contractor Quality Control Program (CQCP) 1 LS 382,280.00$ 382,280.00$ 536,750.00$ 536,750.00$ 2 C-105 Mobilization (10% Maximum) 1 LS 328,640.00$ 328,640.00$ 400,000.00$ 400,000.00$ 3 C-102-1 Temporary Stabilized Construction Entrance (Installation, Maintenance, and Removal) 2 EA 5,000.00$ 10,000.00$ 28,275.00$ 56,550.00$ 4 C-102-2 Temporary Filter Sock Inlet Protection (Installation, Maintenance, and Removal) 13 EA 155.39$ 2,020.07$ 202.00$ 2,626.00$ 5 C-102-3 Temporary SCDOT Type G Suspended Internal Filter (Installation, Maintenance, Removal) 7 EA 339.80$ 2,378.60$ 550.00$ 3,850.00$ 6 C-102-4 Temporary Silt Fence (Installation, Maintenance, Removal) 1,100 LF 4.66$ 5,126.00$ 5.50$ 6,050.00$ 7 C-102-5 Temporary Grassing including Seed, Lime, Fertilizer and Mulch 1.7 AC 1,035.96$ 1,761.13$ 4,250.00$ 7,225.00$ 8 C-102-6 Temporary Slope Drain 0 LF -$ -$ -$ -$ 9 P-101-1 Asphalt Profile Milling, Variable Depth 16,800 SY 11.25$ 189,000.00$ 11.25$ 189,000.00$ 10 P-101-2 Asphalt Profile Milling, 2" TW A3 1,400 SY 26.75$ 37,450.00$ 26.75$ 37,450.00$ 11 P-101-3 Full Depth Pavement Removal 4,900 SY 45.00$ 220,500.00$ 69.25$ 339,325.00$ 12 P-101-4 DELETED 0 EA -$ -$ -$ 13 P-101-5 Pavement Marking Removal 600 SF 10.00$ 6,000.00$ 8.50$ 5,100.00$ 14 P-152-2 Unsuitable Excavation (replace with backfill) 40 CY 72.00$ 2,880.00$ 715.00$ 28,600.00$ 15 P-152-3 Embankment in Place. 400 CY 15.00$ 6,000.00$ 180.00$ 72,000.00$ 16 P-209-1 Crushed Aggregate Base Course (12" Depth) 1,800 CY 175.00$ 315,000.00$ 422.00$ 759,600.00$ 17 P-401-1 Hot Mix Asphalt, Surface Course (4” Depth) 5,300 TON 508.82$ 2,696,746.00$ 473.00$ 2,506,900.00$ 18 P-401-2 Hot Mix Asphalt, Surface Course (2" Depth, A3) 170 TON 753.02$ 128,013.40$ 700.00$ 119,000.00$ 19 P-602-1 Emulsified Asphalt Prime Coat 6,700 GAL 3.00$ 20,100.00$ 6.00$ 40,200.00$ 20 P-603-1 Emulsified Asphalt Tack Coat 1,590 GAL 3.23$ 5,135.70$ 3.00$ 4,770.00$ 21 P-605-1 Crack Repair 5,000 LF 2.75$ 13,750.00$ 3.50$ 17,500.00$ 22 P-608-1 Asphalt Surface Treatment 1,100 SY 16.35$ 17,985.00$ 11.75$ 12,925.00$ 23 P-620-1 Pavement Markings, Temporary, Yellow 5,400 SF 2.00$ 10,800.00$ 5.75$ 31,050.00$ 24 P-620-2 Pavement Markings, Permanent, Yellow, reflective, including microbicide 5,400 SF 2.50$ 13,500.00$ 41.50$ 224,100.00$ 25 P-620-3 Pavement Markings, Temporary, Black 4,400 SF 2.00$ 8,800.00$ 1.00$ 4,400.00$ 26 P-620-4 Pavement Markings, Permanent, Black, including microbicide 4,400 SF 2.00$ 8,800.00$ 1.00$ 4,400.00$ 27 P-620-5 Compass Rose Pavement Markings, Permanent, reflective, including microbicide, Geological Survey and demolition 1 LS 6,000.00$ 6,000.00$ 15,000.00$ 15,000.00$ 28 P-620-6 Pavement Markings, Temporary, Black - Covering Existing Lead-in Lines 1,100 SF 3.00$ 3,300.00$ 1.00$ 1,100.00$ 29 T-901-1 Permanent Grassing (including seed, lime, fertilizer, and mulch) 1.7 AC 4,920.84$ 8,365.43$ 4,450.00$ 7,565.00$ 30 T-904-1 Sodding 2,300 SY 8.29$ 19,067.00$ 14.00$ 32,200.00$ 31 T-905-1 Topsoiling (stripping, stockpiling and final placement) 40 CY 104.56$ 4,182.40$ 580.00$ 23,200.00$ 32 L-105-1 Remove Existing Fixture for Reinstallation, Demolish Anchor/Foundation 29 EA 388.50$ 11,266.50$ 6,780.00$ 196,620.00$ 33 L-105-2 Remove Existing Sign for Reinstallation, Demolish Foundation 2 EA 5,051.25$ 10,102.50$ 11,750.00$ 23,500.00$ 34 L-105-3 Miscellaneous Electrical Demolition 1 LS 20,269.00$ 20,269.00$ 31,250.00$ 31,250.00$ 35 L-108-1 No. 6 AWG, Solid, Bare Counterpoise Wire, Installed in Trench, Above the Duct Bank Or Conduit, Including Ground Rods (Initial and Supplemental) And Ground Connectors3,700 LF 3.11$ 11,507.00$ 4.80 $ 17,760.00$ 36 L-108-2 Trench for Cable Installation, including restoration 3,000 LF 3.09$ 9,270.00$ 4.75$ 14,250.00$ UNIT PRICE TOTAL PRICEITEM NO. PAYMENT SPECIFICATION DESCRIPTION EST QTY UNIT UNIT PRICE TOTAL PRICE Oconee County Regional Airport Taxiway Rehabilitation Virtual Meeting hosted from Oconee County Office Bid Tabulation Page 1 WKD # 20230970.00.RA Oconee County Regional Airport - Taxiway Rehabilitation 5/2/2025 BID TABULATION SHEET I Certify that this is a true and corrected OWNER: record of bids received. PROJECT: LOCATION: 415 South Pine Street Jason Kennedy Walhalla, SC 29691 Ardurra DATE: 22-Apr-25 Please note that items that have been bolded, highlighted and italicized are mathematical corrections. Firm: KWEST GROUP, LLC ROGERS GROUP, INC. Address: 8305 Fremont Pike 1880 S. Hwy 14 Perrysburg, OH 43551 Greer, SC 29650 License Number/Bid Bond GA License No. 120118 GA License No. 119294 UNIT PRICE TOTAL PRICE ITEM NO. PAYMENT SPECIFICATION DESCRIPTION EST QTY UNIT UNIT PRICE TOTAL PRICE Oconee County Regional Airport Taxiway Rehabilitation Virtual Meeting hosted from Oconee County Office 37 L-108-3 No. 8 AWG, 5 kV, L-824, Type C Cable 3,700 LF 2.81 $ 10,397.00 $ 4.35 $ 16,095.00 $ 38 L-110-1 2 Way 2-inch Schedule 40 PVC Conduit - Con crete Encased 500 LF 97.50 $ 48,750.00 $ 520.00 $ 260,000.00 $ 39 L-115-1 Electrical Junction Can Plaza – 2 L-867D B ase Cans 4 EA 6,457.00 $ 25,828.00 $ 9,950.00 $ 39,800.00 $ 40 L-125-1 New L-861T(L) LED Elevated Taxiway Edge Li ght – Base Mounted Installed in Turf 4 EA 2,040.00 $ 8,160.00 $ 3,150.00 $ 12,600.00 $ 41 L-125-2 New L-861T(L) LED Elevated Taxiway Edge Li ght – Stake Mounted Installed in Turf 21 EA 1,110.00 $ 23,310.00 $ 1,710.00 $ 35,910.00 $ 42 L-125-3 New L-861T Incandescent Elevated Taxiway E dge Light – Stake Mounted Installed in Turf 4 EA 1,110.00 $ 4,440.00 $ 1,710.00 $ 6,840.00 $ 43 L-125-5 Relocated L-858 Sign, 3-Module on New Foun dation 2 EA 4,961.00 $ 9,922.00 $ 7,630.00 $ 15,260.00 $ 44 P-101 Remove Existing Storm Drainage 2 EA 4,000.00 $ 8,000.00 $ 19,085.00 $ 38,170.00 $ 45 D-701 Install New Aircraft Rated Drop Inlet-Comple te 2 EA 25,000.00 $ 50,000.00 $ 50,000.00 $ 100,000.00 $ 46 D-751 Install New 24" Class IV RCP 16 LF 1,200.00 $ 19,200.00 $ 785.00 $ 12,560.00 $ 4,744,002.73 $ 6,309,051.00 $ BASE BID: SCHEDULE 2 - TAXILANES TO APRONS REHABILITATION 1 C-100 Contractor Quality Control Program (CQCP) 1 LS 52,000.00 $52,000.00 127,850.00 $ 127,850.00 $ 2 C-105 Mobilization (10% Maximum) 1 LS 45,400.00 $45,400.00 48,000.00 $ 48,000.00 $ 3 C-102-5 Temporary Grassing including Seed, Lime, Fe rtilizer and Mulch 0.6 AC 1,201.52 $720.91 5,425.00 $ 3,255.00 $ 4 P-101-1 Full Depth Pavement Removal 4,300 SY 55.52 $238,736.00 79.50 $ 341,850.00 $ 4.1 P-101-1 Asphalt Profile Milling, Variable Depth 400 SY 88.00 $35,200.00 88.00 $ 35,200.00 $ 5 P-101-5 Pavement Marking Removal 600 SF 10.00 $6,000.00 9.00 $ 5,400.00 $ 6 P-152-2 Unsuitable Excavation (replace with backfil l) 100 CY 80.00 $8,000.00 685.00 $ 68,500.00 $ 7 P-152-3 Embankment in Place 1,050 CY 20.00 $21,000.00 135.00 $ 141,750.00 $ 8 P-209-1 Crushed Aggregate Base Course (12" Depth) 2,100 CY 175.00 $367,500.00 415.00 $ 871,500.00 $ 9 P-401-1 Hot Mix Asphalt, Surface Course (4” Depth) 1,600 TON 515.00 $824,000.00 515.00 $ 824,000.00 $ 10 P-602-1 Emulsified Asphalt Prime Coat 1,900 GAL 3.00 $5,700.00 6.00 $ 11,400.00 $ 11 P-603-1 Emulsified Asphalt Tack Coat 500 GAL 3.00 $1,500.00 3.00 $ 1,500.00 $ 12 P-605-2 Joint Sealing 10 LF 300.00 $3,000.00 45.00 $ 450.00 $ 13 P-620-1 Pavement Markings, Temporary, Yellow 700 SF 5.00 $3,500.00 6.05 $ 4,235.00 $ 14 P-620-2 Pavement Markings, Permanent, Yellow, refl ective, including microbicide 700 SF 5.00 $3,500.00 4.50 $ 3,150.00 $ 15 P-620-3 Pavement Markings, Temporary, Black 600 SF 5.00 $3,000.00 1.00 $ 600.00 $ 16 P-620-4 Pavement Markings, Permanent, Black, inclu ding microbicide 600 SF 5.00 $3,000.00 1.00 $ 600.00 $ 17 T-901-1 Permanent Grassing (including seed, lime, fertilizer, and mulch) 0.6 AC 5,707.23 $3,424.34 6,365.0 0 $ 3,819.00 $ 18 T-904-1 Sodding 800 SY 9.61 $7,688.00 19.75 $ 15,800.00 $ 19 T-905-1 Topsoiling (stripping, stockpiling and fin al placement) 140 CY 96.99 $13,578.60 635.00 $ 88,900.00 $ 20 L-105-1 Remove Existing Fixture for Reinstallation , Demolish Anchor/Foundation 31 EA 384.79 $11,928.49 6,5 75.00 $ 203,825.00 $ 21 L-105-3 Miscellaneous Electrical Demolition 1 LS 20,269.00 $20,269.00 33,000.00 $ 33,000.00 $ 22 L-108-1 No. 6 AWG, Solid, Bare Counterpoise Wire, Installed in Trench, Above the Duct Bank Or Conduit, Including Ground Rods (Initial and Supplemental) And Ground Connectors 4,200 LF 3.11 $13,062.00 5.10 $ 21,420.00 $ BASE BID TOTAL: Bid Tabulation Page 2 WKD # 20230970.00.RA Oconee County Regional Airport - Taxiway Rehabilitation BID TABULATION SHEET I Certify that this is a true and corrected OWNER: record of bids received. PROJECT: LOCATION: 415 South Pine Street Jason Kennedy Walhalla, SC 29691 Ardurra DATE: 22-Apr-25 Please note that items that have been bolded, highlighted and italicized are mathematical corrections. Firm: KWEST GROUP, LLC ROGERS GROUP, INC. Address: 8305 Fremont Pike 1880 S. Hwy 14 Perrysburg, OH 43551 Greer, SC 29650 License Number/Bid Bond GA License No. 120118 GA License No. 119294 UNIT PRICE TOTAL PRICE ITEM NO. PAYMENT SPECIFICATION DESCRIPTION EST QTY UNIT UNIT PRICE TOTAL PRICE Oconee County Regional Airport Taxiway Rehabilitation Virtual Meeting hosted from Oconee County Office 23 L-108-2 Trench for Cable Installation, including r estoration 3,600 LF 3.09 $11,124.00 5.05 $ 18,180.00 $ 24 L-108-3 No. 8 AWG, 5 kV, L-824, Type C Cable 4,100 LF 2.81 $11,521.00 4.60 $ 18,860.00 $ 25 L-110-1 2 Way 2-inch Schedule 40 PVC Conduit - Con crete Encased 400 LF 97.50 $39,000.00 560.00 $ 224,000.00 $ 26 L-115-1 Electrical Junction Can Plaza – 2 L-867D B ase Cans 8 EA 6,457.00 $51,656.00 10,510.00 $ 84,080.00 $ 27 L-125-1 Relocated L-861T Elevated Taxiway Edge Lig ht – Base Mounted Installed in Turf 8 EA 1,861.00 $14,8 88.00 3,030.00 $ 24,240.00 $ 28 L-125-2 Relocated L-861T Elevated Taxiway Edge Lig ht – Stake Mounted Installed in Turf 53 EA 929.00 $49,2 37.00 1,515.00 $ 80,295.00 $ 29 L-125-6 New L-858(L) LED Sign, 3-Module 3 EA 7,022.00 $21,066.00 11,430.00 $ 34,290.00 $ $1,890,199.34 $3,339,949.00 ITEM NO. SPEC NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TO TAL 1 C-100 Contractor Quality Control Program (CQCP) 1 LS $2,600.00 $2,600.00 $26,350.00 $26,350.00 2 C-105 Mobilization (10% Maximum) 1 LS $3,200.00 $3,200.00 $3,860.00 $3,860.00 3 P-101-5 Pavement Marking Removal 670 SF $11.60 $7,772.00 $29.00 $19,430.00 4 P-608-1 Asphalt Surface Treatment 2200 SY $18.96 $41,712.00 $40.25 $88,550.00 $55,284.00 $138,190.00 ITEM NO. SPEC NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TO TAL 1 C-100 Contractor Quality Control Program (CQCP) 1 LS $35,000.00 $35,000.00 $175,000.00 $175,000.00 2 C-105 Mobilization (10% Maximum) 1 LS $37,120.00 $37,120.00 $150,000.00 $150,000.00 3 C-102-4 Temporary Silt Fence (Installation, Mainte nance, Removal) 1000 LF $4.50 $4,500.00 $6.30 $6,300.00 4 C-102-5 Temporary Grassing including Seed, Lime, Fe rtilizer and Mulch 1.5 AC $1,000.00 $1,500.00 $4,220.00 $ 6,330.00 5 P-101-3 Full Depth Pavement Removal 1700 SY $35.00 $59,500.00 $85.00 $144,500.00 6 P-101-6 Remove Aircraft Tie-Downs 6 EA $300.00 $1,800.00 $1,150.00 $6,900.00 7 P-152-2 Unsuitable Excavation (replace with backfil l) 100 CY $100.00 $10,000.00 $470.00 $47,000.00 8 P-152-3 Embankment in Place 850 CY $20.00 $17,000.00 $185.00 $157,250.00 9 P-209-1 Crushed Aggregate Base Course (12" Depth) 640 CY $175.00 $112,000.00 $456.25 $292,000.00 10 P-401-1 Hot Mix Asphalt, Surface Course (4” Depth) 430 TON $549.50 $236,285.00 $549.50 $236,285.00 11 P-602-1 Emulsified Asphalt Prime Coat 600 GAL $3.00 $1,800.00 $7.00 $4,200.00 12 P-603-1 Emulsified Asphalt Tack Coat 130 GAL $3.00 $390.00 $3.00 $390.00 13 P-620-1 Pavement Markings, Temporary, Yellow 700 SF $5.00 $3,500.00 $6.60 $4,620.00 14 P-620-2 Pavement Markings, Permanent, Yellow, refl ective, including microbicide 700 SF $5.00 $3,500.00 $4 .85 $3,395.00 15 P-620-3 Pavement Markings, Temporary, Black 1000 SF $5.00 $5,000.00 $1.05 $1,050.00 16 P-620-4 Pavement Markings, Permanent, Black, inclu ding microbicide 1000 SF $4.00 $4,000.00 $1.05 $1,050.00 BID ALTERNATE #1 TOTAL: BID ALT 1: SEAL COAT OF TAXILANES TO APRONS HELO, 1,2, & 3 INSTREAD OF FULL DEPTH RECONSTRUCTION (IF SELECTED) BID ALTERNATE 1 TOTAL = BID ADDITIVE 1: DEMOLITION AND RELOCATION OF TAXIWAY 3 Bid Tabulation Page 3 WKD # 20230970.00.RA Oconee County Regional Airport - Taxiway Rehabilitation BID TABULATION SHEET I Certify that this is a true and corrected OWNER: record of bids received. PROJECT: LOCATION: 415 South Pine Street Jason Kennedy Walhalla, SC 29691 Ardurra DATE: 22-Apr-25 Please note that items that have been bolded, highlighted and italicized are mathematical corrections. Firm: KWEST GROUP, LLC ROGERS GROUP, INC. Address: 8305 Fremont Pike 1880 S. Hwy 14 Perrysburg, OH 43551 Greer, SC 29650 License Number/Bid Bond GA License No. 120118 GA License No. 119294 UNIT PRICE TOTAL PRICE ITEM NO. PAYMENT SPECIFICATION DESCRIPTION EST QTY UNIT UNIT PRICE TOTAL PRICE Oconee County Regional Airport Taxiway Rehabilitation Virtual Meeting hosted from Oconee County Office 17 T-901-1 Permanent Grassing (including seed, lime, fertilizer, and mulch) 1.5 AC $4,750.00 $7,125.00 $5,095 .00 $7,642.50 18 T-904-1 Sodding 600 SY $8.00 $4,800.00 $23.25 $13,950.00 19 T-905-1 Topsoiling (stripping, stockpiling and fin al placement) 200 CY $74.69 $14,938.00 $150.00 $30,000. 00 20 L-105-1 Remove Existing Fixture for Reinstallation , Demolish Anchor/Foundation 17 EA $338.67 $5,757.39 $7, 650.00 $130,050.00 21 L-105-2 Remove Existing Sign for Reinstallation, D emolish Foundation 3 EA $3,483.27 $10,449.81 $8,335.00 $2 5,005.00 22 L-105-3 Miscellaneous Electrical Demolition 1 LS $20,269.00 $20,269.00 $35,865.00 $35,865.00 23 L-108-1 No. 6 AWG, Solid, Bare Counterpoise Wire, Installed in Trench, Above the Duct Bank Or Conduit, Including Ground Rods (Initial and Supplemental) And Ground Connectors 3000 LF $3.11 $9,330.00 $5.50 $16,500.00 24 L-108-2 Trench for Cable Installation, including r estoration 2600 LF $3.09 $8,034.00 $5.50 $14,300.00 25 L-108-3 No. 8 AWG, 5 kV, L-824, Type C Cable 3900 LF $2.81 $10,959.00 $5.00 $19,500.00 26 L-110-1 2 Way 2-inch Schedule 40 PVC Conduit - Con crete Encased 250 LF $97.50 $24,375.00 $628.00 $157,000.0 0 27 L-115-1 Electrical Junction Can Plaza – 2 L-867D B ase Cans 4 EA $6,457.00 $25,828.00 $11,425.00 $45,700.00 28 L-125-1 New L-861T(L) LED Elevated Taxiway Edge Li ght – Base Mounted Installed in Turf 4 EA $2,040.00 $8, 160.00 $3,610.00 $14,440.00 29 L-125-2 New L-861T(L) LED Elevated Taxiway Edge Li ght – Stake Mounted Installed in Turf 32 EA $1,110.00 $ 35,520.00 $1,965.00 $62,880.00 30 L-125-4 Relocated L-858 Sign, 1-Module on New Foun dation 2 EA $4,109.00 $8,218.00 $7,275.00 $14,550.00 31 L-125-5 Relocated L-858 Sign, 3-Module on New Foun dation 1 EA $5,764.00 $5,764.00 $10,200.00 $10,200.00 $732,422.20 $1,833,852.50 BID ADDITIVE 1 SUBTOTAL= Bid Tabulation Page 4 WKD # 20230970.00.RA Oconee County Regional Airport - Taxiway Rehabilitation BID TABULATION SHEET I Certify that this is a true and corrected OWNER: record of bids received. PROJECT: LOCATION: 415 South Pine Street Jason Kennedy Walhalla, SC 29691 Ardurra DATE: 22-Apr-25 Please note that items that have been bolded, highlighted and italicized are mathematical corrections. Firm: KWEST GROUP, LLC ROGERS GROUP, INC. Address: 8305 Fremont Pike 1880 S. Hwy 14 Perrysburg, OH 43551 Greer, SC 29650 License Number/Bid Bond GA License No. 120118 GA License No. 119294 UNIT PRICE TOTAL PRICE ITEM NO. PAYMENT SPECIFICATION DESCRIPTION EST QTY UNIT UNIT PRICE TOTAL PRICE Oconee County Regional Airport Taxiway Rehabilitation Virtual Meeting hosted from Oconee County Office ITEM NO. SPEC NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TO TAL 1 C-100 Contractor Quality Control Program (CQCP) 1 LS $45,000.00 $45,000.00 $225,000.00 $225,000.00 2 C-105 Mobilization (10% Maximum) 1 LS $54,600.00 $54,600.00 $100,000.00 $100,000.00 3 C-102-5 Temporary Grassing including Seed, Lime, Fe rtilizer and Mulch 1 AC $1,000.00 $1,000.00 $6,050.00 $6, 050.00 4 C-102-6 Temporary Slope Drain -175 LF $0.00 $0.00 $0.00 $0.00 5 C-102-7 Erosion Control Matting Blanket (Installati on, Maintenance) 2900 SY $8.00 $23,200.00 $5.00 $14,500.0 0 6 C-102-8 Temporary Diversion Ditch and Rock Check Da ms (Installation, Maintenance, Removal) 340 LF $7.00 $2 ,380.00 $200.00 $68,000.00 7 P-101-7 Remove Existing Storm Drainage Structure, C omplete 1 EA $1,500.00 $1,500.00 $6,750.00 $6,750.00 8 P-101-8 Abandon in place Existing Storm Pipe, Compl ete 150 LF $55.00 $8,250.00 $75.00 $11,250.00 9 P-152-1 Borrow Excavation 6300 CY $35.00 $220,500.00 $63.00 $396,900.00 10 P-152-2 Unsuitable Excavation (replace with backfi ll) 10 CY $175.00 $1,750.00 $625.00 $6,250.00 11 P-152-3 Embankment in Place 40 CY $15.00 $600.00 $217.00 $8,680.00 12 P-209-1 Crushed Aggregate Base Course (12" Depth) 200 CY $175.00 $35,000.00 $640.00 $128,000.00 13 P-401-1 Hot Mix Asphalt, Surface Course (4” Depth) 130 TON $1,050.00 $136,500.00 $1,050.00 $136,500.00 14 P-602-1 Emulsified Asphalt Prime Coat 100 GAL $3.00 $300.00 $11.00 $1,100.00 15 P-603-1 Emulsified Asphalt Tack Coat 40 GAL $3.00 $120.00 $3.00 $120.00 16 P-620-1 Pavement Markings, Temporary, Yellow 200 SF $10.00 $2,000.00 $8.00 $1,600.00 17 P-620-2 Pavement Markings, Permanent, Yellow, refl ective, including microbicide 200 SF $10.00 $2,000.00 $ 6.00 $1,200.00 18 T-901-1 Permanent Grassing (including seed, lime, fertilizer, and mulch) 1 AC $4,750.00 $4,750.00 $6,875.0 0 $6,875.00 19 T-904-1 Sodding 125 SY $8.00 $1,000.00 $38.00 $4,750.00 20 T-905-1 Topsoiling (stripping, stockpiling and fin al placement) 50 CY $93.42 $4,671.00 $275.00 $13,750.00 21 L-108-1 No. 6 AWG, Solid, Bare Counterpoise Wire, Installed in Trench, Above the Duct Bank Or Conduit, Including Ground Rods (Initial and Supplemental) And Ground Connectors 900 LF $3.11 $2,799.00 $7.00 $6,300.00 22 L-108-2 Trench for Cable Installation, including r estoration 700 LF $3.09 $2,163.00 $7.00 $4,900.00 23 L-108-3 No. 8 AWG, 5 kV, L-824, Type C Cable 800 LF $2.81 $2,248.00 $7.00 $5,600.00 24 L-110-1 2 Way 2-inch Schedule 40 PVC Conduit - Con crete Encased 150 LF $97.50 $14,625.00 $890.00 $133,500.0 0 25 L-125-2 New L-861T(L) LED Elevated Taxiway Edge Li ght – Stake Mounted Installed in Turf -3 EA $1,110.00 - $3,330.00 $1,150.00 -$3,450.00 26 L-125-7 L-853 Retroreflective Marker - Surface Mou nt 3 EA $385.00 $1,155.00 $1,090.00 $3,270.00 $564,781.00 $1,287,395.00 BID ADDITIVE 2: TAXIWAY A STUBOUT BID ADDITIVE 2 TOTAL = Bid Tabulation Page 5 WKD # 20230970.00.RA Oconee County Regional Airport - Taxiway Rehabilitation Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. PROCUREMENT - AGENDA ITEM SUMMARY OCONEE COUNTY, SC COUNCIL MEETING DATE: September 2, 2025 ITEM TITLE: Title: Ardurra Group, Inc (formerly W.K. Dickson) Work Authorization #5 Department(s): Airport (Airport Taxiway Pavement Rehabilitation Construction Phase Services) Amount: FAA 95%: $423,434.94 State 2.5%: $ 11,143.03 County 2.5%: $ 11,143.03 Project Award: $445,721.00 Contingency 15%: $ 66,858.15 Total Award: $512,579.15 FINANCIAL IMPACT: Procurement was approved by Council in Fiscal Year 2025-2026 budget process. Budget: $512,579.15 Project Cost: $512,579.15 Balance: $0.00 Finance Approval: ___________________________ (AIP Project No. 3-45-0016-037-2025 & IIJA / AIG Project No. 3-45-0016-038-2025) BACKGROUND DESCRIPTION: On February 1, 2022, Council approved the award of RFP 21-08 for Professional Engineering and Consulting Services at the Oconee County Airport to W.K. Dickson & Company, Inc. of Columbia, SC, for a five-year term on an as-needed basis. In August 2024, W.K. Dickson merged with Ardurra Group, Inc., and all future work will be carried out under the Ardurra Group name. The Oconee County Regional Airport now seeks to contract with Ardurra Group, Inc. (formerly W.K. Dickson) to provide professional services for Construction Administration (CA) and Construction Observation (CO) for the Airport Taxiway Pavement Rehabilitation Project. • On May 5, 2023 , Oconee County submitted a Taxiway Pavement Rehabilitation (Design/Bid) Project Application to the Federal Aviation Administ ration (FAA) for funding consideration under the Airport Improvement Program (AIP) and the Airport Bipartisan Law (BIL) / Airport Infrastructure Grant (AIG) programs. • On July 31, 2023, Oconee County received Federal Aviation Administration (FAA) Grant Offer under the Airport Improvement Program Grant (AIP) Project No. 3-45-0016-035-2023 and the Airport Bipartisan Law (BIL) / Airport Infrastructure Grant (AIG) Project No. 3 -45-0016-036-2023 for the Taxiway Pavement Rehabilitation (Design/Bid) Project. • On August 15, 2023, Council approved the acceptance of Federal Aviation Administration (FAA) Airport Improvement Program Grant Offer Pr oject No. 3-45-0016-035-2023, the Airport Infrastructure Grant Offer Project No. 3-45-0016-036-2023 for the Taxiway Pavement Rehabilitation (Design & Bidding) along with matching funds. • On September 19, 2023, Council approved the award of Work Authorization #2 (WA #2) to W.K. Dickson, now operating as Ardurra Group, LLC. WA #2 includes profe ssional services for project management, gr ant administration, prelimin ary engineering, design services and plan preparation (civil and electrical), surveying, geotechnical investigations, engineering design, permitting, and bid phase services. • Ardurra Group, Inc. (formerly W.K. Dickson) , has compl eted 100% of the design, bidding specifications, and plans for the Taxiway Pavement Rehabilitation project. • On April 1, 2025 Council approved the submittal of an Airport Improvement Program (AIP) and Airport Bipartisan Law (BIL) / Airport Infrastructure Grant (AIG) to the Federal Aviation Administration (FAA) as well as an application for funding to the South Carolina Aviation Association (SCAA) for the Airport Taxiway Pavement Rehabilitation Construction Project. The FAA application(s) were officially submitted on July 3, 2025. Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. Ardurra Group, Inc. Work Authorization WA#5 in the amount of $445,721.00, includes professional services for construction administration (CA) and construction observation (CO) for the Airport Runway Rehabilitation Construction project. Staff is requesting a 15% contingency in the amount of $66,858.15 to cover any eng ineering and construction monitoring for additional or unforeseen items that may come up during the project. If a change order is requested, it would be accepted by the FAA prior to being approved by the County. SPECIAL CONSIDERATIONS OR CONCERNS: The grant application(s) were submitted on July 3, 2025. On August 20, 2025 Oconee County Received a Grant Award Agreement for Infrastructure Investment and Jobs Act (IIJA) – Airport Infrastructure Grant (AIG) Project No. 3-45-0016-038-2025. This approval request is contingent on receipt of the Grant Award Letter for Airport Improvement Program (AIP) Grant Project No. 3-45-0016-037-20205 from the FAA. The FAA will pay 95% ($423,434.94) of these costs, the SCAC pays 2.5% ($11,143.03) and the County pays a matching 2.5% ($11,143.03). If a change order is requested and approved by the FAA, the FAA will pay 95%, the SCAC will pay 2.5% and the County will match 2.5% of said Change Order. (Approval to accept grant funding is included on this Council Agenda) ATTACHMENT(S): 1. Work Authorization #5 Ardurra Group, Inc. STAFF RECOMMENDATION: It is the staff’s recommendation that Council: 1. Approve Work Authorization #5 from Ardurra Group, Inc. in the amount of $445,721.00 with a 15% contingency of $66,858.15, for a total award of $512,579.15, pending receipt of grant award. 2. Authorize the County Administrator to execute all necessary documents related to this project and to approve any change orders within the approved contingency amount. Submitted or Prepared By: _______________________________ Approved for Submittal to Council: __________________________________ Tronda C. Popham, Procurement Director Amanda F. Brock, County Administrator Oconee County Regional Airport (CEU) Taxiway Pavement Rehab. Construction Phase Work Authorization # 5 Page 1 WORK AUTHORIZATION # 5 May 15, 2025 IN ACCORDANCE WITH GENERAL SERVICES AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN OWNER AND CONSULTANT Dated: February 2, 2022 TAXIWAY PAVEMENT REHABILITATION CONSTRUCTION PHASE SERVICES (AGREEMENT) Oconee County Airport (CEU), Seneca, South Carolina This Work Authorization, made and entered into this ____day of , 2025, by and between the OWNER: Oconee County 415 South Pine Street, Walhalla, South Carolina 29691 and the CONSULTANT: Ardurra Group, Inc. 1320 Main Street, Suite 400 Columbia, South Carolina 29201 Amends the AGREEMENT executed by and between the pa rties hereto on the 2 nd day of February 2022, into which this Work Authorization is hereby incorporated and made a part hereof, to specify the following: Project Overview The OWNER wishes the CONSULTANT to provide construc tion phase services including project management and grant administration, construction a dministration, construction observation (CA/CO), Quality Assurance Testing and Erosion Cont rol Inspection services related to the construction of the rehabilitation and reconstruction of the Taxiway Pavement at the Oconee County Regional Airport (CEU). Design and bidding for thi s project was previously completed by the CONSULTANT as defined in Work Authorization #2 dated September 21, 2023. These services are described in further detail below. The improvements include the rehabilitation and reconstruction of TW A from A1 through A4, relocation of Taxiway A 3 and a portion of the main apron as shown on the enclosed Exhibit A. The OWNER also wishes the CONSULTANT to provide a 3 -year Disadvantaged Business Enterprise (DBE) plan. This plan will provide the three-year DBE Overall Goal and Methodology for Oconee County Airport, based on projects proposed for fiscal years 2025 through 2027. Oconee County Regional Airport (CEU) Taxiway Pavement Rehab. Construction Phase Work Authorization # 5 Page 2 This scope of services is based on the anticipated project duration of 175 consecutive calendar days consisting of 30 days of preconstruction, 100 days of construction and 45 days for closeout. Scope of Services 1. BASIC SERVICES A. Project Management and Grant Administration The CONSULTANT shall provide the following work tasks i. Project Formulation a. Develop the necessary scopes of work and work authorizations. b. Review Work Authorization with FAA and SCAC and address comments ii. Project Management a. Routine Project Management Tasks (Invoicing, Scheduling, etc.) b. Subconsultant invoice processing and management c. Routine monthly coordination with OWNER for invoicing iii. Grant Management a. Prepare pre-application and final grant application packages for FAA and SCAC b. Coordinate with the Federal Aviation Administration (FAA) and the South Carolina Aviation Commission (SCAC). c. Assist the OWNER with preparation of monthly grant draw requests to the FAA and SCAC, assume 7 d. Assist the OWNER with preparation of Quarterly reporting to the FAA. e. Prepare Grant close-out documentation and submittal to FAA and SCAC. B. Construction Administration (Civil) The CONSULTANT will provide the following elements: i. Prepare conformed construction documents and publish Issued for Construction set ii. Prepare the conformed contract for routing to contr actor. Review and recommend execution of the conformed contract to the OWNER. iii. Prepare and submit to the FAA for review and approv al, a Construction Management Program in accordance with AC 150/5370-12B. iv. Prepare for, attend, and conduct one pre-constructi on meeting, including field review of construction elements and project sites and the subsequent preparation and distribution of meeting minutes. v. Prepare for, travel to, conduct and issue meeting minutes for, up to Eight (8) in person bi-weekly construction progress meetings. After each in-person progress meeting a Oconee County Regional Airport (CEU) Taxiway Pavement Rehab. Construction Phase Work Authorization # 5 Page 3 site visit will be conducted by an experienced and qualified design professional, to observe progress and quality of the executed work of Contractor and to determine in general if such work is proceeding in accordance with the contract documents. vi. Review and take appropriate action in respect to shop drawings, samples, results of tests and inspections and other data which each Contractor is required to submit. vii. Review and process contractor pay requests and recommend payment to OWNER. viii. Provide ongoing consultation to the OWNER regarding status of construction and facilitate communication with the contractor. ix. Provide ongoing coordination of work performed by subconsultants x. Review and provide responses to Request for Informa tion (RFI’s) submitted by the contractor. xi. Attend Pre-paving conference conducted by contractor. xii. Conduct site visit/inspections for critical constru ction milestones (e.g. inspection of milled pavement surface prior to paving, observatio n of test strip for Asphalt Pavement (P-401) inspection of taxiway prior to reopening). xiii. Make recommendations to the OWNER regarding contrac t change orders. Preparation of Change Order documents if required. xiv. Review contractor’s initial project schedule and monitor construction progress. xv. Conduct a visit to determine if the Project is subs tantially complete determine if the work has been completed in accordance with the contract documents and determine if Contractor has fulfilled all of his obligations thereunder so that ENGINEER may recommend, in writing, final payment to Contractor and may give written notice to OWNER and the Contractor that the work is acceptabl e (subject to any conditions therein expressed). One initial inspection to be pe rformed for each phase of the project xvi. Develop and distribute punch list inspection and si te report to OWNER and Contractor. One inspection to be performed for each phase of the project xvii. Conduct a visit to determine if the Project is at f inal completion to determine if the work has been completed in accordance with the contract documents and determine if Contractor has fulfilled all of his obligations thereunder so that ENGINEER may recommend, in writing, final payment to Contractor and may give written notice to OWNER and the Contractor that the work is acceptabl e (subject to any conditions therein expressed). One final inspection to be performed for each phase of the project xviii. Review contractor’s final pay application & require d project close-out documents. Provided all punch list items are properly addresse d by the contractor, recommend payment of final pay application to the contractor by the OWNER. xix. Coordinate the compiling Final Engineer Report and As-built/Record Drawings. Oconee County Regional Airport (CEU) Taxiway Pavement Rehab. Construction Phase Work Authorization # 5 Page 4 C. Construction Administration (Electrical) Construction Administration for electrical work ite ms will be provided by a subconsultant, Walls Engineering, PLLC. to the CONSULTANT and will include the following: i. Attend bi-weekly meetings virtually, assume 8 meetings ii. Review and take appropriate action in respect to el ectrical related shop drawings, samples, results of tests and inspections and other data which each Contractor is required to submit. iii. Review and provide responses to electrical related Request for Information (RFI’s) submitted by the contractor. iv. Conduct two (2) site visit/inspections with OWNER for visual review of construction activities v. Make recommendations to the CONSULTANT regarding contract change orders. vi. Attend the pre-final inspection. vii. Prepare an inspection report and punch list for electrical work items. viii. Attended final inspection. Additional details for this element of work may be found in Attachment C. D. DBE Plan 3-year Update Consultant will prepare a Three-Year DBE Plan Updat e. This task includes planning services required by the FAA to develop the updated three-ye ar DBE Overall Goal and Methodology for Oconee County Airport, based on projects propos ed for fiscal years 2025 through 2027. Subtasks associated with this work generally include the following: i. Develop FY 2025-2027 Goals & Methodology; ii. Develop narrative text to update administrative document; iii. Compile available historic bid info & other DBE-related documents; iv. Prepare preliminary engineering cost estimates for FY 2025-2027 projects; v. Review proposed goal & methodology with Sponsor; vi. Coordinate submittal to FAA Civil Rights Office, their review & approval. This task has a separate timeline from the other Taxiway Rehabilitation work defined within this Work Authorization. Anticipated schedule for this work is three months from the notice to proceed to realizing FAA Civil Rights Office approval. 2. SPECIAL SERVICES A. Construction Observation (CO) / Resident Project Representative (RPR) The CONSULTANT is to provide the following elements: i. Provide a full-time representative to perform on-site construction observation of the proposed construction activities (i.e., resident pr oject representative services) for a duration of 100 calendar days (10 hours per workday/5 workdays per week). Oconee County Regional Airport (CEU) Taxiway Pavement Rehab. Construction Phase Work Authorization # 5 Page 5 ii. The responsibilities and limitations of the CO/RPR services shall conform to Section IV of the AGREEMENT. iii. Attend pre-construction meeting, including review o f construction elements and project sites. iv. Prepare daily construction observation reports. v. Conduct wage rate interviews of contractor and subcontractor personnel. vi. Attend bi-weekly construction progress meetings, tw o (2) meetings per month are accounted for in this scope of work. vii. Review completed pay item quantities with contractor prior to contractor’s submittal of a pay request. viii. Monitor contractor’s project schedule. ix. Attend a pre-final inspection. x. Assist with preparation of inspection report and final punch list. xi. Attend a final inspection to confirm all punch list items have been addressed. B. Quality Assurance Testing The CONSULTANT shall provide quality assurance test ing for the proposed construction. Testing shall be conducted and documented in accord ance with the construction contract for embankment (P-152), subbase (P-154), aggregate base course material (P-209) and asphalt pavement (P-401). Services shall include testing of the following items: i. Excavation and Embankment (P-152) ii. Aggregate Base Course (P-209) iii. Asphalt Paving (P-401) This service shall be completed by a sub consultant to the CONSULTANT, S&ME, Inc. Additional details for this element of work may be found in Attachment D. C. Erosion Control Inspection & Reporting The CONSULTANT shall provide the following services to support compliance with the project Erosion and Sedimentation Control Permit issued by SCDES. i. Provide notification to SCHEC prior to start of construction indicating start of work and anticipated project schedule. ii. Conduct weekly erosion control inspection and reporting for a duration of 100 calendar days. Erosion control inspections will be perform ed weekly by a Certified Erosion Prevention & Sediment Control Inspector (CEPSCI). iii. Report inspection findings to the contractor when i ssues requiring corrective actions are observed. iv. Conduct site visits to observe the completion of corrective actions. v. Communicate with the contractor to collect informat ion needed to document the completion of corrective actions. vi. Upon completion of construction, submit request for permit termination and close out to SCDES. Oconee County Regional Airport (CEU) Taxiway Pavement Rehab. Construction Phase Work Authorization # 5 Page 6 to SCDES. This service shall be completed by a sub consultant to the CONSULTANT, S&ME, Inc. Additional details for this element of work may be found in Attachment D. DELIVERABLES: The CONSULTANT will provide the following project deliverables to the OWNER: 1. Copy of Final Inspection Report and Punchlist 2. Photos of completed project 3. Final Report of Construction, and as-builts drawings FEE SCHEDULE 1. BASIC SERVICES A. Project Management & Grant Admin. Lump Sum $ 33,0 07.00 B. Construction Administration (Civil) Lump Sum $ 1 61,114.00 C. Construction Administration (Electrical) HNTE $ 35,645.00 D. DBE 3-Year Update Lump Sum $ 15,242.00 Basic Services Subtotal $245,008.00 2. SPECIAL SERVICES A. Construction Observation HNTE $128,571.00 B. Quality Assurance Testing Cost $59,749.00 C. Erosion Control Inspection & Reporting Cost $12,393 .00 Special Services Subtotal $ 200,713.00 WORK AUTHORIZATION # 5 TOTAL $445,721.00 COMPENSATION The total fee of all work and expenses is in the amount of $445,721.00. Miscellaneous additional work required but not contained in the above scope of se rvices will be paid for in accordance with the current rate schedule at that time and will be subject to prior approval by the OWNER. PROJECT SCHEDULE The timing of the project is dependent upon FAA fun ding and availability of the selected General Oconee County Regional Airport (CEU) Taxiway Pavement Rehab. Construction Phase Work Authorization # 5 Page 7 for the execution of the defined project tasks. Work task durations and level of effort are an estimate and reflect what is typical and standard for this type of construction project. This scope assumes typical preconstruction coordination with the Owner and Contractor for a duration of approximately 30 days prior to Notice to Proceed (NTP), 100 calendar days of construction and 45 days after the completion of construction for coordination with the Owner and Contractor for completion of punch list work and preparation of contract and grant close out documentation. Project factors such as the availability of labor, materials, and the selected contractor’s ability to complete the work within the approved project schedule is outside the control of the CONSULTANT. ADDITIONAL SERVICES The OWNER shall pay the CONSULTANT for additional services, which are not specifically called for in the above Scope of Services, in accordance w ith the CONSULTANT’S rate schedule in effect at the time; and will be subject to prior approval by the OWNER. All services and compensation under this Work Authorization No. 5 shall be in accordance with the Master Agreement (Contract for Professional Services) dated February 2, 2022. IN WITNESS WHEREOF, the parties hereto have made an d executed this Contract as of the date and year first written above. OWNER : CONSULTANT : OCONEE COUNTY, SOUTH CAROLINA ARDURRA, INC. By: By: Christopher Birkmeyer, P.E. Aviation South Group Leader Date: Date: List of Attachments Exhibit A: Project Exhibit Attachment A: Hour Summary and Fee Estimate Attachment B: Expense Summary Attachment C: Subconsultant Proposal for Electrica l Construction Administration Attachment D: Subconsultant Proposal for Quality A ssurance and Erosion Control Inspection X X X X X XXXXXXXXX X XXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X XX X JPKACCDHJUNE 2025EXHIBIT A202309700.01.RA FILE PATH:Z:\Projects\Oconee County SC\2023097000RA - CEU WA2 Taxiway Pavement Rehabilitation\CADD\Plan Set\Exhibits\2025-06-05 Taxiway Rehab Rev.dwgZ:\Projects\Oconee County SC\2023097000RA - CEU WA2 Taxiway Pavement Rehabilitation\CADD\Plan Set\Exhibits\2025-06-05 Taxiway Rehab Rev.dwg, CHARRISON, 6/5/2025 4:39:38 PMCOPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. THIS DRAWING IS AN INSTRUMENT OF SERVICE AND SHALL REMAIN THE PROPERTYOF THE ENGINEER AND SHALL NOT BE COPIED, REPRODUCED, PUBLISHED, OR USED IN ANY WAY WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OFTHE ENGINEER. ONLY COPIES MARKED WITH AN ORIGINAL SIGNATURE AND SEAL OF THE ENGINEER SHALL BE CONSIDERED VALID, TRUE COPIES. WKD PROJ. NO.:PROJECT NAME: DRAWING NUMBER: DRAWING TITLE: REVISION RECORD DESCRIPTIONBYDATE PROJ. DATE:PROJ. MGR.:DESIGN BY:DRAWN BY: NO. PROFESSIONAL SEALOCONEE COUNTY REGIONAL AIRPORT (CEU)SENECA, SOUTH CAROLINATAXIWAY PAVEMENT REHABILITATIONPROJECT EXHIBIT EXHIBIT DRAWING - NOT FOR CONSTRUCTION LEGEND TAXIWAY REHABILITATION0200200400GRAPHIC SCALE: 1" = 200'100 RUNWAY 7/25TAXIWAY 'A' RELOCATED TAXIWAYCONNECTOR TO ADDRESSDIRECT CONNECTION TAXIWAY CONNECTOR SEAL COATTAXIWAY CONNECTOR REMOVAL TO ADDRESS DIRECT CONNECTIONRELOCATED TAXIWAY CONNECTOR TO ADDRESS DIRECT CONNECTION TAXIWAY SEAL COATTAXIWAY SEAL COAT TAXIWAY CONNECTORREMOVAL TO ADDRESS DIRECTCONNECTION A-2 A-3 A-3 A-4 A-5 720 CORPORATE CENTER DRRALEIGH, NC 27607(t)919-782-0495(f)919-782-9672WWW.ARDURRA.COMNC LICENSE NO.F-0374 DATE PREPARED: 06-10-2025 WBS NUMBER: SUB- TOTAL PHASE AND TASK DESCRIPTION Principal Senior Project Project Aviation Senior Aviation Construction Admin. Manager Manager Engineer Designer Planner Observer Basic Services A. Project Management and Grant Administration Estimated duration 30 days pre-con,100 calendar days, 4 5 days closeout - 175 days/6 months/ 25 weeks a Project Formulation i. Develop Work Authorization 2 2 4 4 2,572.25 $ i. Work Authorization review with FAA & SCAC and addr essing comments 2 2 2 2 1,887.53 $ b Project Management i. Routine Management Tasks (Invoicing, Scheduling, etc) 8 2 12 6 6,756.33 $ ii. Subconsultant Management for invoicing 12 12 4,108.33 $ iii. Routine monthly coordination with OWNER for invo icing 12 3 3,303.94 $ c Grant Management i. Prepare pre-application and final grant application packages 1 8 4 2 2,873.71 $ ii. Coordination with FAA and SCAC 1 4 1,161.91 $ iii. Monthly Grant Draw Requests (7) 1 8 14 4,070.46 $ iv. Assist with Quarterly Grant Reporting 1 1 4 1,045.26 $ v. Grant Close-out Documentation 1 2 8 12 4,387.07 $ Task Subtotal 13 24 59 0 0 34 0 29 32,166.80 $ B. Construction Administration (Civil) Estimate Duration 175 days (30 days preconstruction, 100 Construction, 45 Days closeout: 6 months ) i. Prepare conformed construction documents and publish Issued for Construction set 8 20 40 2 12,843.09 $ ii. Prepare conformed construction contract, recommend execution by owner 2 2 684.72 $ iii. Preparation of Construction Management Program (5370- 12B) 2 8 30 6 9,401.30 $ iv. Prepare, Attend, Conduct and Issue Minutes for One (1) Pre-Con Meeting 8 4 2 2,881.29 $ v. Routine Progress Mtg, Prep, conduct, Issue Minutes ( 8 meetings) 80 16 21,596.02 $ vi. Shop Drawing Review (assume 25) 8 50 12,131.10 $ vii. Review Contractor Pay Request (assumes 6) 6 18 14 6,671.50 $ viii. Ongoing Consultation to the Owner throughout Constructi on (4 hours/week) 4 60 15,142.67 $ ix. Coordination of work preformed by subconsultants 2 30 8 9,219.51 $ x. Review and Response to Contractor RFIs (assume 10) 8 30 8,010.65 $ xi. Attend two Pre-paving conference conducted by Contract or (one for each phase) 16 4 4,484.02 $ xii. Conduct site visits for critical construction milestones (assumes 2) 16 16 6,956.29 $ xiii. Change Order, recommendations and document preparati on (assume 2) 4 16 24 8 10,931.32 $ xiv. Review Contractor's project schedule and monitor thr ough construction 20 4,574.91 $ xv. Conduct pre-final inspection (1 inspection per phase,( 2 inspections) 12 12 5,217.22 $ xvi. Prepare and distribute pre-final inspection report and punch list (2 inspections) 2 8 2,105.67 $ xvii. Conduct final inspection (1 inspection per phase) (2 inspections) 12 12 5,217.22 $ xviii. Review Contractors Final Pay Request and required close out documents 4 4 1,369.44 $ xix. Project & Grant close out documentation (Record Dr awings and Final Report) 2 12 20 40 10 15,375.96 $ Task Subtotal 14 0 328 272 80 0 0 48 154,813.91 $ ATTACHMENT 'A' PROJECT DESCRIPTION: CEU Taxiway Pavement Rehab (Con struction Phase) PREPARED BY: Kristopher Erwin & Jason Kennedy / Ardur ra Group, Inc. TASK NUMBER Employee Classifications C. Construction Administration (Electrical) Construction Administration 35,645.00 $ Task Subtotal 0 0 0 0 0 0 0 0 35,645.00 $ D. DBE 3-Yr Update i. Develop FY 2025-2027 Goals & Methodology 2 6 18 8 5,662.59 $ ii. Develop Narrative Document to Update 2 8 2 1,860.26 $ iii. Compile Historic Bid Info & Other DBE Related Documents 2 2 4 2 1,623.94 $ iv. Prepare Preliminary Engineering Cost Ests. for FY 2025-2027 Projects 2 6 2 1,778.46 $ v. Review Proposed Goal & Methodology with OWNER 6 4 2,051.14 $ vi. Coordinate Submittal to FAA Civil Rights Office, Their Review & Approval 2 4 4 2,266.25 $ Task Subtotal 4 22 0 0 8 40 0 12 15,242.65 $ Special Services A. Construction Observation/ Resident Project Representa tive (RPR) i. Full Time RPR 100 calendar days, 15 weeks, 50hr/week 750 109,070.82 $ Task Subtotal 0 0 0 0 0 0 750 0 109,070.82 $ B. Quality Assurance Testing i. Quality Assurance Testing (S&ME) 59,748.60 $ Task Subtotal 0 0 0 0 0 0 0 0 59,748.60 $ C. Erosion Control Inspections & Reporting i. Erosion Control Inspections & Reporting 12,393.00 $ Task Subtotal 0 0 0 0 0 0 0 0 12,393.00 $ TOTAL HOURS/CATEGORY: 31.00 46.00 387.00 272.00 88.00 74.00 750.00 89.00 419,080.78 $ RATES PER HOUR: 117.00 $ 81.50 $ 75.50 $ 68.00 $ 55.00 $ 47.00 $ 48.00 $ 37.50 $ PAYROLL BURDEN: 3,627.00 $ 3,749.00 $ 29,218.50 $ 18,496.00 $ 4,840.00 $ 3,478.00 $ 36,000.00 $ 3,337.50 $ TOTAL WORK HOURS: 1,737.00 TOTAL PAYROLL BURDEN: 102,746.00 $ GENERAL OVERHEAD @ 172.51%: 177,247.12 $ Task Breakdown Labor Expense Rounded Total Cost of Capital @ 0.44 % 452.08 $ Basic A. Project Management and Grant Administration 32,166.80 $ 840.00 $ 33,007.00 $ PAYROLL SUBTOTAL: 280,445.21 $ B. Construction Administration (Civil) 154,813.91 $ 6,300.00 $ 161,114.00 $ COMPARATIVE FEE @ 11%: 30,848.97 $ C. Construction Administration (Electrical) 35,645.00 $ -$ 35,645.00 $ TOTAL: 311,294.18 $ D. DBE 3-Yr Update 15,242.65 $ 15,242.00 $ DIRECT EXPENSES: 26,640.00 $ Special A. Construction Observation (RPR) 109,070.82 $ 19,500.00 $ 128,571.00 $ PRIME GRAND TOTAL: 337,934.18 $ B. Quality Assurance Testing 59,748.60 $ -$ 59,749.00 $ SUBCONSULTANT TOTAL 107,786.60 $ C. Erosion Control Inspections and Reporting 12,393.00 $ -$ 12,393.00 $ GRAND TOTAL 445,721.00 $ See Proposal See Proposal See Proposal GRAND TOTAL: 445,720.78 $ GENERAL PROJECT WORK: ITEM QTY DESCRIPTION UNIT COST A. Project Management and Grant Admin. 2 Trip(s) @ 600 miles @ $0.700 $840.00 A. Project Management and Grant Admin. $840.00 B. Construction Administration* Pre Construction Meeting 1 Trip(s) @ 600 miles @ $0.700 $420.00 Progress Meetings 8 Trip(s) @ 600 miles @ $0.700 $3,360.00 Pre-Paving Meeting 1 Trip(s) @ 600 miles @ $0.700 $420.00 Site Visits for construction Milestones 3 Trip(s) @ 600 miles @ $0.700 $1,260.00 Pre-Final Inspection 1 Trip(s) @ 600 miles @ $0.700 $420.00 Final Inspection 1 Trip(s) @ 600 miles @ $0.700 $420.00 *All Trips reflect Raleigh, NC office to CEU unless noted otherwise B. Construction Administration $6,300.00 A. Construction Observation/ Resident Project Representative (RPR) Full Time RPR for 100 Days, 15 weeks at 50 hr/week Weekly Travel to/from the site 15 Trip(s) @ 250 miles @ $0.700 $2,625.00 Weekly Travel at the site 15 Trip(s) @ 50 miles @ $0.700 $525.00 Hotel(5 nights /week) 75 Nights of Lodging $150.00 $11,250.00 Per Diem 75 Days $68.00 $5,100.00 A. Construction Observation/ Resident Project Representative (RPR)$19,500.00 $26,640.00 Subconsultant Expenses Construction Administration (Electrical) 35,645.00$ Quality Assurance Testing 59,748.60$ Erosion Control Inspections 12,393.00$ 107,786.60$ I. BASIC SERVICES DIRECT EXPENSES SUBCONSULTANT EXPENSES TOTAL DIRECT EXPENSES TOTAL II. SPECIAL SERVICES SUBCONSULTANT EXPENSES DATE PREPARED: 06-10-2025 ATTACHMENT 'B' - DIRECT EXPENSES PROJECT DESCRIPTION: CEU Runway Pavement Rehab (Construction Phase) PREPARED BY: Kristopher Erwin & Jason Kennedy / Ardurra Group, Inc. WBS NUMBER: ` Scope of Services Oconee County Regional Airport Taxiway Pavement Rehabilitation Electrical Construction Admin 8226 Creedmoor Road, Suite 201, Raleigh, NC 27613 ● Phone 919.522.0628 ● www.we-engineering.com Electrical Construction Administration Support A. CONSTRUCTION ADMINISTRATION (CA) : Construction Administration services for the project will be provided by the CONSULTANT. Construction Administration services shall include the following: • Complete Two (2) site visits with the OWNER to review construction. The site visit will be a visual review of the construction activities. • Attend bi-weekly construction progress meetings virtually throughout the duration of the project (8 meetings anticipated). • Review and respond (or take other appropriate action in respect of) shop drawings and samples, the results of tests and inspections and other data which each Contractor is required to submit (10 submittals anticipated). • Review and respond to request for information from the Contractor (3 RFIs accounted for). • Recommend to WKD change orders and/or supplemental agreements to the construction contract incidental to existing field conditions or improvements in the project design. Prepare estimates of cost or savings from proposed order(s), prepare change order(s) along with basis for recommendation and negotiate on behalf of OWNER with the Contractor to arrive, if possible, at an appropriate compensation resulting from the proposed revisions. In collaboration with WKD, coordinate Review of change orders and Supplemental agreements with the SCDOT Airport Project Manager (APM) for acceptance and concurrence regarding grant assurances and eligibility prior to execution (2 Change Orders Accounted for). • Attend Pre-final and final walk through at or near the end of the project as scheduled by the Airport / WKD. B. MISCELLANEOUS 1. All work not specifically stated in this scope of work is excluded. For clarity, a list of exclusions is shown below: a. Any permitting b. Electrical Construction Inspection Services c. Sub-Surface evaluation of electrical items d. Electrical Testing The above list is not all-inclusive. C. DELIVERABLES • Field reports during site visits during construction ` Scope of Services Oconee County Regional Airport Taxiway Pavement Rehabilitation Electrical Construction Admin 8226 Creedmoor Road, Suite 201, Raleigh, NC 27613 ● Phone 919.522.0628 ● www.we-engineering.com • Reviewed electrical shop drawings • Responded to RFIs • Change Order documents, as required • Electrical Punchlist • Record drawings – DWG Format and PDF format D. PROJECT FEE The total fee to perform the scope of services described herein is shown in the attached man-hour / task break and will billed hourly not to exceed. END OF S COPE OF SE RVICES Oconee County Regional Airport Taxiway Pavement Rehabilitation Electrical Construction Admin Electrical - REV(0) 4/30/2025 DESCRIPTION PROJECT MANAGER ENGINEER Design Engineer Admin Total Labor Rate: $ 195 Rate: $ 175 Rate: $ 150 Rate: $ 105 MH COST MH COST MH COST MH COST MH COST Construction Admin Support Review and provide responses to electrical Request for Information (RFI’s) submitted by the contractor (3 RFIs Accounted For) 1 $195.00 12 $2,100.00 8 $1,200.00 0 $0.00 $3,495.00 Review and process electrical shop drawing submittals (10 Submittals Anticipated) 1 $195.00 20 $3,500.00 8 $1,200.00 0 $0.00 $4,895.00 Conduct site visit/inspections on an as needed basis (2-site visits) 1 $195.00 16 $2,800.00 8 $1,200.00 0 $0.00 $4,195.00 Virtual Construction Progress Meetings (8 Meetings - Biweekly) 4 $780.00 12 $2,100.00 8 $1,200.00 0 $0.00 $4,080.00 Attended final inspection with Inspection Report 1 $195.00 12 $2,100.00 8 $1,200.00 0 $0.00 $3,495.00 Provide consultation to the OWNER, as needed, regarding electrical work items and facilitate communication with the contractor. 1 $195.00 12 $2,100.00 0 $0.00 0 $0.00 $2,295.00 Prepare an inspection report and punch list for electrical work items. 1 $195.00 12 $2,100.00 0 $0.00 0 $0.00 $2,295.00 Attend the pre‐final inspection, if required. 0 $0.00 12 $2,100.00 0 $0.00 0 $0.00 $2,100.00 Make recommendations to the OWNER regarding contract change orders (2 Change Orders Accounted For) 1 $195.00 12 $2,100.00 20 $3,000.00 0 $0.00 $5,295.00 Record Drawings 1 $195.00 6 $1,050.00 12 $1,800.00 0 $0.00 $3,045.00 12 $ 2,340 126 $ 22,050 72 $ 10,800 0 $ - Direct Expenses Printing $ - Total Labor $ 35,190.00 Travel - 2 trips (325 mi per trip at 70-cents per mile) $ 455.00 Direct Expenses $ 455.00 Direct Expenses Subtotal $ 455.00 Total $ 35,645.00 Walls Engineering,pllc CLASSIFICATION RAW RATE BREAKEVEN MULTIPLIERPROFITHOURLY RATE PROJECT MANAGER $70.32 2.521 10% $195.00 ENGINEER $63.11 2.521 10% $175.00 DESIGN ENGINEER $54.09 2.521 10% $150.00 ADMIN. $37.86 2.521 10% $105.00 S&ME, Inc. | 48 Brookfield Oaks Drive, Suite F | Greenville, SC 29607 | p 864.297.9944 | www.smeinc.com March 19, 2025 WK Dickson & Co., Inc. 1350 Church Street Ext. NE, Suite 200 Marietta, Georgia 30060 Attention: Mr. Kris Erwin, P.E. Reference: Proposal for Quality Assurance Testing CEU – Taxiway A Pavement Rehabilitation Oconee County Regional Airport (CEU) Seneca, Oconee County, South Carolina S&ME Proposal No. 25600215 Dear Mr. Erwin: S&ME, Inc. appreciates the opportunity to submit this proposal to provide Quality Assurance Testing Services (“QA”-level construction materials testing) for the referenced project. This proposal describes our understanding of the project, discusses the intended scope of our services, and presents the estimated probable cost for our services (based on established unit rates that will apply).  Project Information Our understanding of the project is based on the following information: • Email between Mr. Kris Erwin, P.E. with WK Dickson and Mr. Gant Taylor, P.E. with S&ME on March 15, 2025; and • Issue for 100% Design Progress Set by WK Dickson, dated February 2025. From our correspondence and review of the referenced material, we understand Oconee County Regional Airport (CEU) is planning to rehabilitate the primary taxiway system. The components of the project will include pavement rehabilitation of the parallel taxiway and associated connectors. The taxiway is approximately 4,800 feet in length, primary connectors are roughly 240 feet long, and secondary connectors to aprons are 80 feet long. The project primarily consists of asphalt paving (FAA P-401), P-209 stone base course placement (P-209), and some grading work along the taxiway shoulders (P-152). We understand this portion of work has around 100 calendar days for the Base Bid work.  Scope of Services Based on the provided project documents, we anticipate the following services may be required. Following is a general description of each of the services proposed. Testing will be performed in general accordance with the applicable ASTM/FAA and/or industry standards, unless noted otherwise. We will coordinate our site visits for testing with the RPR, Contractor, and the Contractor’s QC firm. Proposal for Quality Assurance Testing CEU – Taxiway A Pavement Rehabilitation Oconee County Regional Airport Seneca, Oconee County, South Carolina S&ME Proposal No. 25600215 March 19, 2025 2 Excavation, Subgrade, and Embankment [P-152] Our services related to the excavation, subgrade, and embankment can include the following: • Perform density testing in accordance with ASTM D 1557 and/or ASTM D6938; • Perform modified Proctor (ASTM D1557) laboratory testing per each soil type based on visual classification; and • Observe proofrolling operations of the soil subgrade as required by the project specifications. Please note, S&ME will not be responsible for surveying the Embankment for grade acceptance. Crushed Aggregate Base Course [P-209] Our services related to the crushed aggregate base course can include the following: • Observe and review the contractor’s thickness measurements; • Perform laboratory testing in accordance with ASTM D1557 and ASTM C136; and • Perform density testing in accordance with ASTM D 1556 and/or ASTM D6938. Asphalt Mix Pavement [P-401] Our services related to the asphalt pavement courses can include the following: • Quality Assurance Observations and Testing of Asphalt Pavements: We have assumed the following services will be needed during asphalt placement: • Our personnel can be present at the contractor’s asphalt laboratory during production of the P -401 HMA products. We can observe as the contractor runs the required tests during each day’s production and perform the specified sampling and testing procedures for quality assurance. • Our personnel can be present at the taxiway during asphalt placement to observe ambient air temperature, asphalt temperature, lift thickness, and compaction effort of the asphalt. • Control Strip: We have assumed that the control strip will be performed by the contractor several days prior to production and that our personnel will be present at the plant and at the placement location to perform specified sampling and testing. Erosion Control Monitoring Services S&ME will perform stormwater control inspection work in accordance with the requirements of SCDHEC NPDES General Permit for Stormwater Discharges From Construction Activities (Permit No. SCR100000) issued January 29, 2021. It should be noted that this proposal only covers the inspection requirements of the permit which are found in Section 4.20 of this Permit and specifically excludes other requirements of the permit. S&ME will perform an inspection at least once every calendar week of erosion control measures on the project site as indicated on the Stormwater Pollution Plan (SWPPP) and within 24 hours of the end of a storm event of 0.5 inches or greater, as recommended by SCDHEC. S&ME should be scheduled by the contractor of a qualifying rain event in excess of 0.50 inches. Our field reports will be available for review in a binder on site. A representative of the General Proposal for Quality Assurance Testing CEU – Taxiway A Pavement Rehabilitation Oconee County Regional Airport Seneca, Oconee County, South Carolina S&ME Proposal No. 25600215 March 19, 2025 3 Contractor will be informed of deficiencies noted during the inspections. Our inspections will continue until final stabilization is achieved on pertinent areas of the project site. For each inspection we will complete an inspection report. At a minimum, the inspection report will include:  The inspection date;  Names, titles, and, if not previously given in an inspection report, the qualifications of personnel making the inspection, unless those qualifications change;  Weather information for the period since the last inspection (or since commencement of construction activity if the first inspection) including a reasonable estimate of the beginning of each storm event, duration of each storm event, approximate amount of rainfall for each storm event (in inches), and knowledge of discharge occurrence;  Weather information and a description of any discharges occurring at the time of the inspection;  Location(s) of discharges of sediment or other debris from the site;  Location(s) of Best Management Practices (BMPs) that need maintenance;  Location(s) of BMPs that failed to operate as designed or are inadequate for a particular location;  Location(s) where additional BMPs are needed that did not exist at the time of inspection;  Corrective action required including any changes to the SWPPP necessary and implementation dates;  Site Name, Operator Name, and permit number; and  Assessment that all BMP’s and stormwater controls identified in the OS-SWPPP have been installed and are operating as designed. Site Meeting Attendance • Pre-Paving Meeting: We understand that a pre-paving meeting will be held and that S&ME will be requested to attend this meeting. • Progress Meetings: We understand that S&ME will be requested to attend periodic progress meetings (expected to be bi-monthly, with possible virtual attendance). • Punchlist Meetings: We understand that S&ME will be requested to attend punchlist walkthroughs on- site (two meetings are expected). • Geotechnical Review: We will review and advise on Geotechnical related shop drawings and RFIs. This scope of services should be reviewed by the Design Professional in Charge to confirm that it meets their requirements. If additional services beyond those described in this proposal are required, we can prepare an addendum to this proposal describing those services.  REPORTING Field reports will be prepared by our technicians and draft copies can be provided to the on -site representative daily if requested. Our report formats follow the general requirements of the applicable ASTM standard. Formal reports summarizing our test results will be distributed according to a project distribution list directed by the client after our Project Manager has reviewed them. Proposal for Quality Assurance Testing CEU – Taxiway A Pavement Rehabilitation Oconee County Regional Airport Seneca, Oconee County, South Carolina S&ME Proposal No. 25600215 March 19, 2025 4  EXCLUDED SERVICES Without attempting to provide a complete list of all services or potential services that will be excluded from this proposal and not performed by S&ME, the following services are specifically excluded from this proposal. Some of these services can be performed by S&ME if desired; however, a separate or revised proposal for these services would be required. • Directing of any contractor’s or subcontractor’s work. • Any aspect of site safety other than safety of S&ME employees. • Environmental Services. • Quality Control Testing (provided by Contractor).  CLIENT RESPONSIBILITIES We ask that you be responsible for the following: 1. Scheduling: Provide us with the name of the individual who will be responsible for scheduling and directing our testing services. Provide, or instruct your appointed representative to provide, a minimum 24-hour notice for our services. When our services will be needed on weekends and/or holidays (Memorial Day, July 4 th, Labor Day, Thanksgiving Day, the day after Thanksgiving, Christmas Eve, Christmas Day, and New Year's Day), we require a minimum 48-hour notification. 2. Report Distribution: Provide us with all applicable names and addresses for report distribution.  SCHEDULE We anticipate that our services will be performed on both a full-time and part-time on-call basis for the operations outline above. Scheduling should be made through the S&ME project manager assigned to this project who will assign the appropriate, qualified personnel to perform the requested work. For our correspondence with Mr. Erwin, we understand construction is scheduled to begin in late August / early September 2025, with a 100 calendar day duration. The construction will be performed during daytime hours and be performed in two phases. For estimation of erosion control inspections, we will perform them on a weekly basis and after each ½ inch rainfall event, estimated at one additional trip per two weeks throughout the construction process, which is an assumed 20-week time period, for a total of 30 inspections. We request that a minimum one-week notification be provided whenever our initial services are needed so that we may coordinate our field personnel to meet your specific needs. We request at least a one -day notice when part-time, on call work is needed. If our services will be needed during off-hours (between 7:00 pm and 7:00 am) and/or on holidays (Memorial Day, 4th of July, Labor Day, Thanksgiving Day, the day after Thanksgiving, Christmas Eve, Christmas Day, and New Year's Day), we require a minimum 48-hour notification. Proposal for Quality Assurance Testing CEU – Taxiway A Pavement Rehabilitation Oconee County Regional Airport Seneca, Oconee County, South Carolina S&ME Proposal No. 25600215 March 19, 2025 5 S&ME will not be responsible for any damages caused by construction delays that are related to inadequate notice, improper scheduling, or for work performed by the Contractor without our presence.  COMPENSATION Based on the scope of services we have outlined above, we have developed a fee estimate. Time schedules used to develop this fee estimate were based on the provided information. We estimate a budget allowance on the order of $72,141.60 will be required. We have enclosed a Fee Schedule that would be appropriate for the proposed services. Units used will be billed in accordance with our Fee Schedule provided. The estimated units used for the proposed budget are outlined on the attached Estimate of Probable Cost. The budget allowance is approximate and may vary depending on final construction schedules, which may be affected by weather and/or scheduling by the contractor. In addition, any re-testing required as a result of non-compliance items, inadequate scheduling, or testing not outlined in this proposal, including those from design changes, will affect this cost estimate.  AUTHORIZATION Our Agreement for Services, Form Number AS-071, is attached and is incorporated as a part of this proposal. Please indicate your acceptance of our proposal by signing the form and returning it to our office. We will then proceed with the performance of services. If you elect to accept our proposal by issuing a purchase order, then please reference this proposal number and date. Your purchase order will be an acceptance of our Agreement of Services and an authorization to proceed with the performance of our services. The terms and conditions included in any purchase order shall not apply, as our agreement is for services that are not compatible with purchase order agreements. This proposal was sent to you via email. If you elect to accept our proposal by return email, then please reference this proposal number and date. Your email acceptance will serve as representation to S&ME that you have reviewed the proposal and associated Agreement for Services (AS-071) and hereby accept both as written. This proposal is solely intended for the Basic Services as described in the Scope of Services. The Scope of Services may not be modified or amended, unless the changes are first agreed to in writing by the Client and S&ME. Use of this proposal and resulting documents is limited to above-referenced project and client. No other use is authorized by S&ME, Inc. Proposal for Quality Assurance Testing CEU – Taxiway A Pavement Rehabilitation Oconee County Regional Airport Seneca, Oconee County, South Carolina S&ME Proposal No. 25600215 March 19, 2025 6  CLOSING We appreciate the opportunity to provide this proposal to you. If you have any questions regarding the services we have outlined above, please do not hesitate to contact us at (864) 297-9944. Sincerely, S&ME, Inc. Kyle D. Anderson, P.E. Gant M. Taylor, P.E. Project Manager Senior Engineer Attachments: Fee Schedule Estimate of Probable Cost Agreement for Services Form (AS-071) 1 Associate Staff Professional, regular time, per hour…………………………………………………………………………………………………………………….$95.00 2 Staff Professional, regular time, per hour…………………………………………………………………………………………………………………….$135.00 3 Project Manager, regular time, per hour…...................................................................... $155.00 4 Senior Engineer, regular time, per hour…………………………………………………………………………………………………………………….$185.00 5 Principal Engineer, regular time, per hour…………………………………………………………………………………………………………………….$210.00 6 Field Services Coordinator, regular time, per hour….............................................................. $135.00 7 Secretarial Services, regular time, per hour…………………………………………………………………………………………………………………….$75.00 8 Erosion Control Inspector, per hour….............................................................................. $85.00 TECHNICIAN SERVICES 1 Special Inspector / Engineering Technician….................................................................. $70.00 2 Senior Special Inspector / Engineering Technician….................................................................................................$70.00 3 Metals Technician / Special Inspector (Wood, Steel) regular time, per hour…………………………………………………………………………………………………………………….$105.00 1 Standard Proctor Compaction Test (ASTM D698), each…………………………………………………………………………………………………………………………..$195.00 2 Modified Proctor Compaction Test (ASTM D1557), each…………………………………………………………………………………………………………………………..$225.00 3 ABC Stone Proctor Compaction Test, each………………………………………………………………………………………………………………$225.00 4 ABC Stone Gradation, each…………………………………………………………………………………………………………………………….$175.00 5 Grain Size Tests (Wash 200 Sieve), each……………………………………………………………………………………………………………………………..$95.00 6 Grain Size Tests (With Hydrometer), each……………………………………………………………………………………………………………………………$175.00 7 Atterberg Limits Test, each……………………………………………………………………………………………………………………………………………………..$95.00 8 Natural Moisture Content Test, each……………………………………………………………………………………………………………………………………$20.00 9 Triaxial Compression Test (remolded, consolidated undrained), each……………………………………………………………………………………………….$1,200.00 10 Direct Shear Test, each………………………………………………………………………………………………. $500.00 11 Compressive Strength of concrete cylinders*, each……………………………………………………………………………………………….$20.00 12 Compressive Strength of Grout Prisms (ASTM C1019), each……………………………………………………………………………………………………………………………..$20.00 13 Compressive Strength of 2" mortar cube samples (ASTM C109), each……………………………………………………………………………………………………………………………..$20.00 14 Specific Gravity/Density of Asphalt Cores, each……………………………………………………………………………………………….$50.00 15 Coring Truck, per day…................................................................................................................ $300.00 1 Equipment/Vehicle Charge, per trip……………………………………………………………………………………………………………………………………………………….$50.00 2 Mileage….................................................................................................................... $0.85 Note: A. Overtime rates will be 1.5 times the regular rate indicated for labor for technician services B. Overtime includes all time in excess of 8 hours per day, Saturdays, Sundays & Holidays 2025 S&ME UNIT RATE FEE SCHEDULE CONSTRUCTION TESTING SERVICES Greenville / Spartanburg, SC PROFESSIONAL SERVICES MATERIAL TESTING SERVICES MISCELLANEOUS EQUIPMENT A. Engineering Technician: Assume 4 weeks at 20 hours a week for compaction testing and proofrolling during P-152 and P-209 activities. (10 visits) 1. Regular Time 80 hours at $70.00 /hr --------------- $5,600.00 C. Modified Stone Base Compaction Test 1 each at $275.00 /each --------------- $275.00 D. Equipment Charge 10 days at $50.00 /day --------------- $500.00 E. Mileage (86 miles R.T.) 860 miles at $0.85 /miles --------------- $731.00 SUBTOTAL $7,106.00 II. Asphalt Mix Pavement [P-401] Testing Services A. Engineering Technician: Assume full time for 6 weeks at 5 visits per week at 10 hours to observe asphalt paving services in the field and assume additional 30 visits at 6 hours a day to observe the laboratory test in the contractor's asphalt plant. (50 visits) 1. Regular Time 420 hours at $70.00 /hr --------------- $29,400.00 2 Overtime 60 hours at $105.00 /hr --------------- $6,300.00 B. Project Engineer: Assume a site visit during construction of the control strip at 6 hours to observe asphalt. paving (1 visit) 1. Regular Time 6 hours at $155.00 /hr --------------- $930.00 C. Equipment Charge 20 day at $50.00 /each --------------- $1,000.00 D. Mileage (86 miles R.T.) 3526 miles at $0.85 /miles --------------- $2,997.10 SUBTOTAL $40,627.10 III. Erosion Control Monitoring Services A. Erosion Control Inspector: Assume 20 weeks of weekly inspections and 10 additional trips for rain events over 1/2-inch at 4 hours a visit. (24 visits) 1. Regular Time 120 hours at $85.00 /hr --------------- $10,200.00 B. Mileage (86 miles R.T.) 2580 miles at $0.85 /miles --------------- $2,193.00 SUBTOTAL $12,393.00 IV. Project Meetings, Project Management, Administration, and Reporting A. Project Manager 50 hours $155.00 /hr --------------- $7,750.00 B. Administrative Support 15 hours $75.00 /hr --------------- $1,125.00 C. Senior Engineer 15 hours $185.00 /hr --------------- $2,775.00 D. Mileage (86 miles R.T.) 430 miles at $0.85 /miles --------------- $365.50 SUBTOTAL $12,015.50 Total Budget Estimate $72,141.60 Estimate of Probable Cost CEU - Taxiway Pavement Rehabilitation Oconee County Regional Airport / Seneca, South Carolina S&ME Proposal No. 25600215 I. Excavation, Subgrade, and Embankment [P-152] and Crushed Aggregate Base Course [P-209] Testing Services 2025-13 STATE OF SOUTH CAROLINA COUNTY OF OCONEE ORDINANCE 2025-13 AN ORDINANCE AMENDING CHAPTER 20 (LAW ENFORCEMENT) OF THE OCONEE COUNTY CODE OF ORDINANCES BY ADDING ARTICLE V, ENTITLED “PROHIBITED OR RESTRICTED CONDUCT – SOLICITATION, OBSTRUCTION OF PUBLIC STREETS, UNAUTHORIZED CAMPING,” IN ORDER TO ADDRESS CERTAIN HAZARDS AND PUBLIC H ARM RELATED THERETO; AND OTHER RELATED MATTERS. WHEREAS, consistent with the powers granted county governments by S.C. Code § 4-9- 25 and S.C. Code § 4-9-30, Oconee County (“County”), a body politic and corporate and a political subdivision of the State of South Carolina, acting by and through its governing body, the Oconee County Council (“County Council”), has the authority to enact regulations, resolutions, and ordinances, not inconsistent with the Constitution and the general law of the State of South Carolina, including the exercise of such powers in relation to health and order within its boundaries and respecting any subject as appears to it necessary and proper for the security, general welfare, and convenience of the County or for preserving health, peace, order, and good government therein; WHEREAS, the County has adopted multiple ordinances for the effective, efficient governance of the County, which, subsequent to adoption, are codified in the Oconee County Code of Ordinances (“Code of Ordinances”), as amended; and WHEREAS, County Council recognizes that there is a need to revise the law of the County to meet the changing needs of the County, and that there is a need to amend, specifically, Article 20 (Law Enforcement) of the Code of Ordinances by adding Article V, entitled “Prohibited or Restricted Conduct – Solicitation, Obstruction of Public Streets, Unauthorized Camping,” in order to address certain hazards and public harm related thereto , and to affirm and preserve all other provisions of the Code of Ordinances not specifically or by implication amended thereby. NOW, THEREFORE, it is hereby ordained by the Oconee County Council, in meeting duly assembled, that: 1. Chapter 20 (Law Enforcement) of the Oconee County Code of Ordinances is hereby amended by the addition of Article V, entitled “ Prohibited or Restricted Conduct – Solicitation, Obstruction of Public Streets, Unauthorized Camping” as set forth in Exhibit A, attached hereto and incorporated herein by reference. 2. Should any part or provision of this Ordinance be deemed unconstitutional or unenforceable by a court of competent jurisdiction, such determination shall not affect the rest and remainder of this Ordinance, all of which is hereby deemed separable. 2025-13 3. All ordinances, orders, resolutions, and actions of County Council inconsistent herewith are, to the extent of such inconsistency only, hereby repealed, revoked, and rescinded. 4. All other terms, provisions, and parts of the Code of Ordinances not amended hereby, directly or by implication, shall remain in full force. 5. This Ordinance shall take effect and be in full force from and after third reading and enactment by County Council. ORDAINED in meeting, duly assembled, this ____ of ________________, 2025. ATTEST: Jennifer C. Adams Matthew Durham Clerk to Oconee County Council Chair, Oconee County Council First Reading: July 15, 2025 Second Reading: August 19, 2025 Third Reading: September 02, 2025 Public Hearing: September 02, 2025 EXHIBIT A ARTICLE V. - PROHIBITED OR RESTRICTED CONDUCT – SOLICITATION, OBSTRUCTION OF PUBLIC STREETS, UNAUTHORIZED CAMPING. 1. APPLICATION. This chapter applies to all unincorporated areas of the Oconee County, and to any other areas under its jurisdiction by intergovernmental agreement, operation of law, or otherwise. 2. DEFINITIONS. For the purpose of this chapter, the following definitions shall apply unless the context clearly indicates or requires a different meaning. a. Aggressive Manner shall mean any of the following: i. Before, during or after soliciting, approaching or speaking to a person, or following a person, if that conduct is intended or is likely to cause reasonable persons to fear bodily harm to themselves or to another, or damage to or loss of property, or to otherwise be intimidated into giving money or any other thing of value; ii. In the course of soliciting, intentionally touching or causing physical contact with another person or an occupied vehicle without that person's consent; iii. Intentionally blocking or interfering with the safe or free passage of a pedestrian or vehicle by any means, including unreasonably causing a pedestrian or vehicle operator to take evasive action to avoid physical contact with the solicitor; iv. Before, during or after soliciting, using violent or threatening gestures toward a person; v. Persisting in closely following or approaching a person, after the person has informed the solicitor by words or conduct that such person does not want to be solicited or does not want to give money or any other thing of value to the solicitor; or vi. Before, during or after the solicitation, using profane, offensive or abusive language which is likely to cause the person solicited to be threatened by such language. b. Right-of-Way or Rights -of-Way. A public road over which a person or entity has the legal right to access. c. Soliciting or Solicitation . To approach someone with a request or plea for funds or items of value, whether in exchange for something of value or not. d. Solicitor. A person who engages in soliciting. e. Special Event. A pre-planned activity sponsored by an individual, group, organization or entity, to be held on public property, including public streets, sidewalks, trails, facilities, parks or other property owned or managed by the county, which event would significantly impact either public property and/or normal vehicular and pedestrian traffic or require the use of county services, and which shall include but not be limited to a p arade, foot race, bike or wheeled race, celebration, amusement event, cultural recognition, sporting event, demonstration, competition, commercial movie or television production, photography shoot, commercial for -profit event, charitable cause, or other similar activity. 3. SOLICITING. a. The provisions of this section do not apply to a permitted special event. b. Obstructing public ways and means of ingress to and egress from private property. i. Solicitors shall not obstruct or otherwise inhibit the free, safe, and efficient flow of vehicular or pedestrian traffic on any public sidewalks, streets, rights -of-way, or other public property. ii. Solicitors shall not obstruct or otherwise inhibit the free, safe, and efficient flow of vehicular or pedestrian traffic into and out of private property adjacent to any public right-of-way. c. Soliciting during certain hours prohibited. No person shall engage in soliciting between sunset and sunrise. d. Approaching vehicular traffic prohibited. Under no circumstances shall a person soliciting approach any moving vehicle or step into the roadway to approach a vehicle stopped at an intersection. e. Soliciting unlawful on private property. It shall be unlawful to engage in soliciting on any property where a sign is posted that states “No Trespassing,” “No Peddlers,” “No Solicitors, “No Buskers,” or words of similar import. f. Blocking rights-of-way. i. Solicitors shall position themselves so that they, and any crowd that they may draw, will not: 1. Block roadways, fire apparatus access roads, sidewalks, crosswalks, driveways, doors, stairways, curb cuts, or handicapped access ramps; 2. Block access to buildings, parks, conveyances, businesses, or traffic control poles containing a pedestrian crosswalk button(s); 3. Be within three feet of a utility apparatus or appurtenance; or 4. Be within twenty ( 20) feet of a fire hydrant, fire department connection, fire alarm or other emergency communication device. At a minimum, there shall be at least a five-foot passageway on the sidewalk. ii. If a solicitor shall attract a crowd sufficient to violate this section , then a law enforcement officer shall have authority to disperse that portion of the crowd that is in violation. iii. Personal property used for soliciting shall not be left unattended on any public right- of-way or other publicly-owned place. iv. Noise. The conduct and behavior of all solicitors shall otherwise comply in all respects with existing noise ordinances at all times. v. Littering. Solicitors shall remove all trash and debris that has been generated during the time of their solicitation. vi. Aggressive solicitation prohibited. No person shall solicit in an aggressive manner on a public right-of-way, sidewalk, or other publicly-owned property. g. Prohibited areas for solicitors. There shall be no soliciting within fifty (50) feet of the perimeter of a(n): i. Automatic teller machine (ATM); ii. Church grounds, while in session; iii. School grounds, while in session; iv. Library; v. Hospital; vi. Funeral home; vii. Bank or other financial institution; viii. Hotel, motel, or other lodging accommodations generally open to the public; ix. Outdoor dining or merchandise area; x. Entrance or exit of a performance venue; xi. Special event; xii. Food or merchant "drive-through" area; xiii. Transit stop; xiv. Parking lot; xv. Daycare; or xvi. Construction areas. During times of construction work on the streets, sidewalks or other public infrastructure, the county may from time to time temporarily prohibit solicitors from the area near such construction work. 4. PROHIBITED BEHAVIOR ON PUBLIC OR PRIVATE PROPERTY. a. Obstructing streets. Any person who remains standing, lying, or sitting down on any public sidewalk, street, alley, or other public property in such a manner as to obstruct or impede the free passage of pedestrians or public travel, after being requested to immediately move by a law enforcement officer, shall be found in violation of this section (obstructing streets). b. Disorderly conduct – Unauthorized camping; damaging county property. i. Any person who shall occupy, lodge, or sleep in any building, structure, or place, whether public or private, or in any motor vehicle, without the written permission of the owner or person entitled to possession or in control thereof, shall be found in violation of this section (disorderly conduct). ii. Camping on public property. 1. It shall be unlawful for any person, except as may be specifically authorized by the appropriate governmental authority, to use any of the streets, sidewalks, parks, or playgrounds, or any other public property for the purpose of camping at any time; or to cause or permit any vehicle to remain in any of said places to the detriment of public travel or convenience. 2. It shall be unlawful for any person, except as may be specifically authorized by the appropriate governmental authority, to light or use a campfire or a bonfire on public property. 3. It shall be unlawful for any person, except as may be specifically authorized by appropriate governmental authority, to hang, fasten, or attach any rope, wire, chain, or electrical device or power cord to any public property, including buildings, bridges, overpasses, or utility poles. iii. Damaging county property. It is unlawful for any person, except as may be specifically authorized by appropriate governmental authority, to willfully or negligently to cut, mutilate, deface or otherwise injure any building, tree, shrub, lamppost, fence, bridge, hydrant, cart, vehicle, or other real or personal property belonging to or under the control of the county, or used for any public purpose. 5. PENALTY. Any person who violates any provision of this ordinance may be fined not more than $500, imprisoned for not more than 30 days, or both. 2025-14 STATE OF SOUTH CAROLINA COUNTY OF OCONEE ORDINANCE 2025-14 AN ORDINANCE AMENDING CHAPTER 20 (LAW ENFORCEMENT) OF THE OCONEE COUNTY CODE OF ORDINANCES BY ADDING ARTICLE VI , ENTITLED “PUBLIC NUISANCES ,” IN ORDER TO ADDRESS CERTAIN HAZARDS AND PUBLIC H ARM RELATED THERETO; AND OTHER RELATED MATTERS. WHEREAS, consistent with the powers granted county governments by S.C. Code § 4-9- 25 and S.C. Code § 4-9-30, Oconee County (“County”), a body politic and corporate and a political subdivision of the State of South Carolina, acting by and through its governing body, the Oconee County Council (“County Council”), has the authority to enact regulations, resolutions, and ordinances, not inconsistent with the Constit ution and the general law of the State of South Carolina, including the exercise of such powers in relation to health and order within its boundaries and respecting any subject as appears to it necessary and proper for the security, general welfare, and co nvenience of the County or for preserving health, peace, order, and good government therein; WHEREAS, the County has adopted multiple ordinances for the effective, efficient governance of the County, which, subsequent to adoption, are codified in the Oconee County Code of Ordinances (“Code of Ordinances”), as amended; and WHEREAS, County Council recognizes that there is a need to revise the law of the County to meet the changing needs of the County, and that there is a need to amend, specifically , Article 20 (Law Enforcement) of the Code of Ordinances by adding Article V I, entitled “P ublic Nuisances,” in order to address certain hazards and public harm related thereto, and to affirm and preserve all other provisions of the Code of Ordinances not specifically or by implication amended thereby. NOW, THEREFORE, it is hereby ordained by the Oconee County Council, in meeting duly assembled, that: 1. Chapter 20 (Law Enforcement) of the Oconee County Code of Ordinances is hereby amended by the addition of Article V I, entitled “Public Nuisances ” as set forth in Exhibit A, attached hereto and incorporated herein by reference. 2. Should any part or provision of this Ordinance be deem ed unconstitutional or unenforceable by a court of competent jurisdiction, such determination shall not affect the rest and remainder of this Ordinance, all of which is hereby deemed separable. 3. All ordinances, orders, resolutions, and actions of County Council inconsistent herewith are, to the extent of such inconsistency only, hereby repealed, revoked, and rescinded. 2025-14 4. All other terms, provisions, and parts of the Code of Ordinances not amended hereby, directly or by implication, shall remain in full force. 5. This Ordinance shall take effect and be in full force from and after third reading and enactment by County Council. ORDAINED in meeting, duly assembled, this ____ of ________________, 2025. ATTEST: Jennifer C. Adams Matthew Durham Clerk to Oconee County Council Chair, Oconee County Council First Reading: July 15, 2025 Second Reading: August 19, 2025 Third Reading: September 02, 2025 Public Hearing: September 02, 2025 EXHIBIT A ARTICLE VI. - PUBLIC NUISANCES. 1. DEFINITIONS. a. Business means any commercial establishment, use, property or structure used in, or part of, a business or commercial use or establishment. Business does not include purely residential property. b. Continuous breach of the peace means a pattern of repeated acts or conduct which either (1) directly disturbs the public peace or (2) disturbs the public peace by inciting or tending to incite violence. c. Public nuisance means conduct, conditions, events, circumstances, or the unreasonable interference or the causing of unreasonable interference with rights of the public, wherever occurring, including, but not limited to, a business or commercial establishment, a public place, or where the public congregates or is invited or permitted to congregate. Public nuisance includes those conditions or circumstances constituting a nuisance as set forth in S.C. Code § 15-43-10, specifically, the construction, establishment, continuance, maintenance, use, ownership, occupation, the leasing or releasing of any property, building or other place used for the purposes of lewdness, assignation, prostitution, human trafficking, repeated acts of unlawful possession or sale of controlled substances, or continuous breach of the peace. Public nuisance also includes and is founded upon the sound principle set forth in South Carolina case law that "if one maintains a place where the laws are publicly, repeatedly, persistently, and intentionally violated, then such place would become a common or public nuisance." State v. Turner, 198 S.C. 499, 505, 18 S.E.2d 376, 378 (1942). 2. NUISANCES OFFENDING PUBLIC DECENCY, PEACE AND ORDER . The following are hereby declared to be public nuisances affecting public decency, peace and order, whether such violations are of an intermittent, cyclical, continual, reoccurring or constant nature; and including when the responsible party generates, enables, or contributes to the occurrence of the unlawful behavior by an absence or failure of property management policy or practice, absence or failure of control over the property, absence or failure of supervision of guests or invitees, or clients, customers, patrons, or any other person providing some form of c ompensation for some type of product or service, or absence or failure of security measures: a. Any business where gambling devices, slot machines, punch boards and other such contrivances of similar character involving any elements of chance as a consideration or any type of gambling, bookmaking, wagering or betting is carried on, and all gambling equipment, except where such specific form of gambling is permitted by law; b. Any business operated as a bawdy house, house of assignation, place of prostitution or used and maintained for the commercial or criminal purposes of unlawful sexual activity or human trafficking in violation of federal or state law or local ordinances; c. Any business where alcohol or intoxicating liquors are manufactured, sold, bartered or given away in violation of federal or state law or local ordinances, or where alcohol or intoxicating liquors are kept for sale, barter or distribution in violation of federal or state law or local ordinances, and all alcohol, liquors, bottles, kegs, pumps, bars and other property kept at and used for maintaining such a place; or where required fire marshal or other safety plans are not in place, or where persistent violations of law occur under a failed or ineffective fire marshal or other safety plan; d. Any business where acts of sale, manufacture, possession or distribution of controlled substances occur in violation of federal or state law or local ordinances; e. Any business where violations against federal or state law or local ordinances occur with such frequency or intensity that they require an excessive public safety response cost. "Excessive public safety response" means: i. The recurring deployment of law enforcement officers, peace or code enforcement officers commissioned pursuant to S.C. Code § 4-9-145, fire marshals or emergency services personnel to an emergency scene at a business as a result of an unlawful act which results in or could result in great bodily injury or death, or the recurring need for public safety or county code enforcement personnel or emergency vehicles at a business when compared to the frequency or intensity of law or regulation enforcement required at other similarly situated businesses; or ii. There have been six (6) or more law or peace officer enforcement dispatches, incident reports, citations, or search warrants executed, or a combination thereof, at a business for any of the following during the preceding twelve (12) months: 1. Violation of any federal, state, or local alcohol law; 2. Violation of any federal, state, or local narcotics law; 3. Violation of any federal, state, or local gun law; 4. Assaults; 5. Crimes of violence against another person(s); or 6. Crimes against property. 3. CRIMINAL ENFORCEMENT. PENALTIES. A person who erects, establishes, continues, maintains, uses, owns, occupies, leases, or releases, or serves as lessor or lessee of any building in such a way as to create a public nuisance shall be guilty of a misdemeanor and shall be subject to a fine not exceeding five hundred dollars ($500.00) and imprisonment not exceeding thirty (30) days. Court costs are not included in any fine imposed by the court. Each day any violation of this ordinance continues shall constitute a separate offense. The Oconee County Sheriff’s Office shall enforce this ordinance with the consultation and concurrence of the County Administrator (“Administrator”). The Oconee County Sheriff (“Sheriff”) and the Administrator, acting jointly, may declare a business in violation of this ordinance a public nuisance, and the Sheriff or any Deputy Sheriff may enforce the provisions of this ordinance upon the declaration of a public nuisance as provided for herein by uniform traffic ticket, or warrant or by any other lawful process. 4. REMEDIES NOT EXCLUSIVE. The provisions of this ordinance are in addition to, and not in lieu of, any other enforcement provision or process permitted by law. Nothing in this ordinance supplants, alters, or limits a statutory or common law right of a person to bring an action in court or the right of Oconee County to prosecute a person for the establishment of a nuisance. 2025-15 STATE OF SOUTH CAROLINA COUNTY OF OCONEE ORDINANCE 2025-15 AN ORDINANCE AMENDING CHAPTER 10 (EMERGENCY MANAGEMENT AND SERVICES) OF THE OCONEE COUNTY CODE OF ORDINANCES BY REVISING THE PROVISIONS OF ARTICLE II.A., ENTITLED “RESCUE SQUAD ADVISORY COMMISSION”; AND OTHER RELATED MATTERS. WHEREAS, consistent with the powers granted county governments by S.C. Code § 4-9- 25 and S.C. Code § 4-9-30, Oconee County (“County”), a body politic and corporate and a political subdivision of the State of South Carolina, acting by and through its governing body, the Oconee County Council (“County Council”), has the authority to enact regulations, resolutions, and ordinances, not inconsistent with the Constitution and the general law of the S tate of South Carolina, including the exercise of such powers in relation to health and order within its boundaries and respecting any subject as appears to it necessary and proper for the security, general welfare, and convenience of the County or for pre serving health, peace, order, and good government therein; WHEREAS, the County has adopted multiple ordinances for the effective, efficient governance of the County, which, subsequent to adoption, are codified in the Oconee County Code of Ordinances (“Code of Ordinances”), as amended; and WHEREAS, County Council recognizes that there is a need to revise the law of the County to meet the changing needs of the County, and that there is a need to amend, specifically, Chapter 10 (Emergency Management and Services) of the Oconee County Code of Ordinances by revising the provisions of Article II.A. “Rescue Squad Advisory Commission” in order to reorganize the Rescue Squad Advisory Commission, its responsibilities and reporting procedures; and to affirm and preserve all other provisions of the Code of Ordinances not specifically or by implication amended thereby. NOW, THEREFORE, it is hereby ordained by the Oconee County Council, in meeting duly assembled, that: 1. Article II.A. “Rescue Squad Advisory Commission” of C hapter 10 ( Emergency Management and Services) of the Oconee County Code of Ordinances is hereby revised, amended, and restated as set forth in Exhibit A, attached hereto and incorporated herein by reference. 2. Should any part or provision of this Ordinance be deemed unconstitutional or unenforceable by a court of competent jurisdiction, such determination shall not affect the rest and remainder of this Ordinance, all of which is hereby deemed separable. 3. All ordinances, orders, resolutions, and actions of County Council inconsistent herewith are, to the extent of such inconsistency only, hereby repealed, revoked, and rescinded. 2025-15 4. All other terms, provisions, and parts of the Code of Ordinances not amended hereby, directly or by implication, shall remain in full force. 5. This Ordinance shall take effect and be in full force from and after third reading and enactment by County Council. ORDAINED in meeting, duly assembled, this ____ of ________________, 2025. ATTEST: Jennifer C. Adams Matthew Durham Clerk to Oconee County Council Chair, Oconee County Council First Reading: August 18, 2025 Second Reading: September 02, 2025 Third Reading: September 16, 2025 Public Hearing: September 16, 2025 ARTICLE II. A. RESCUE SQUAD ADVISORY COMMISSION Sec. 10-31. - Purpose of article. The purpose of this article is to restructure the Oconee County Rescue Squad Advisory Commission, whose mission is to provide a body of active members of the Oconee County rescue service to be responsible for guidance, advice, and recommendations to the Oconee County Council (“County Council” or “Council”) on current and future rescue squad activities and needs in Oconee County (“County”). Sec. 10-32. – Reorganization of the Oconee County Rescue Squad Advisory Commission. The County Council hereby reorganizes the Oconee County Rescue Squad Advisory Commission (the “Rescue Commission” or “Commission”) as follows: (a) Membership. The Rescue Commission shall consist of seven members, all of which shall be entitled to vote on matters brought before the Rescue Commission. 1. One member shall be appointed by the Oconee County Rescue Squad Chiefs and one member shall be appointed by the Oconee County Emergency Services Rescue Chief, and such members may reside anywhere within the County. 2. County Council shall appoint the remaining five members, with one member to be nominated for appointment by each County Council member from his or her respective district. All members of the Commission appointed by County Council must be, and remain, residents of the County Council district from which they are appointed to serve. 3. All commissioners must remain active rescue squad members in good standing in Oconee County. 4. Appointment of new members under this ordinance shall be held within forty-five (45) days of the enactment of this ordinance or as soon thereafter as reasonably possible. The Oconee County Rescue Squad Advisory Commission commissioners that are in office at the time of the enactment of this ordinance shall be succeeded by a new slate of commissioners to be appointed under this section. The current commissioners shall continue to serve, however, until th eir successors are appointed hereunder, and current commissioners may be appointed to the Commission reorganized hereby. (b) Term of members. 1. The length of the term served by each commissioner appointed by County Council shall be four years, beginning on January 1 of the year of appointment. 2. For the purposes of implementing the standards of this section and thereby establishing a reappointment / replacement schedule of the membership of the Commission to staggered terms, the initial term of all members appointed by County Council after the enactment of this ordinance shall be the same length as the remaining term of the Council member who nominated them. 3. After the initial appointment, the term of each Commission member appointed by County Council shall be four years, equal to and coinciding with the term of the Council member nominating them, with all terms beginning as of January 1 of the year of appointment or reappointment. 4. The Oconee County Rescue Squad Chiefs and the Oconee County Emergency Services Rescue Chief shall appoint or reappoint their respective commissioners annually. 5. Commissioners ultimately serve at Council’s pleasure and may be removed by Council, with or without cause, by a vote of a positive majority of Council. There are no term limits. Sec. 10-33. – Meetings and officers. (a) The Rescue Commission shall meet at least monthly at a time and place selected by the membership thereof or at a place designated by County Council . Within sixty ( 60) days of the passage of this ordinance and the appointment of the Rescue Commission members hereunder, or as soon thereafter as reasonably possible, and thereafter during the January meeting of each year, there shall be selected a chairman, a vice-chairman, and a secretary, together with such other officers as the Rescue Commission may deem necessary. These officers shall serve for one year, or until their successors are duly elected and qualified. The terms of the officers elected from the initial Commission established after enactment of this ordinance shall end December 31, 2025. (b) In addition, the Rescue Commission may adopt such by-laws as it deems necessary for the orderly performance of its duties and functions. Any by- laws which may be adopted by the Rescue Commission for the orderly performance of its duties must comply with th is article, all applicable ordinances of the County, and the laws of the State of South Carolina, specifically i ncluding, but not limited to, the Freedom of Information Act. All meetings shall be open to the public. Notice of the meetings shall be given to the Clerk to Co unty Council, the media, and the public in a manner consistent with the Freedom of Information Act. Sec. 10-34. – Powers and duties. The powers and duties of the Rescue Commission shall be as follows: (a) To advise the County Council’s Law Enforcement, Public Safety, Health & Welfare Committee (or “Committee”) on matters affecting the operation and activities of the various rescue squads and other emergency protection service agencies of the County and to formulate plans and advise the Committee on the operation and maintenance of the rescue squads and emergency protection service agencies and their equipment, personnel, and training. (b) To submit its advice and counsel to the Law Enforcement, Public Safety, Health & Welfare Committee in the form of oral and/or written reports for consideration at the Committee’s quarterly meetings, which reports shall summarize the activities, findings, and functions of the Commission, together with the agenda for the Commission’s next meeting, all of which shall be submitted to the chairman of the Law Enforcement, Public Safety, Health & Welfare Committee or his/her designee within a reasonable time prior to the Committee’s respective meeting. (c) To participate in the formulation of the budget and budgetary appropriations affecting the areas of concern of the Rescue Commission for County Council consideration. (d) To prepare plans and recommendations to the Law Enforcement, Public Safety, Health & Welfare Committee in the areas of the Commission’s responsibility and activity, with recommendations for the implementation of such plans. (e) To generally advise the County Council’s Law Enforcement, Public Safety, Health & Welfare Committee on any matter within the scope of the Rescue Commission’s activities, which would tend to improve the efficiency and beneficial operation of County government in the fields of activity with which the Rescue Commission is concerned. (f) Each commissioner appointed by County Council shall visit each r escue squad within the commissioner’s respective County Council district, and meet with the chief(s) thereof, as frequently as necessary in order to stay informed of the business and operations of such squads. (g) Any advice or recommendations conveyed to the Law Enforcement, Public Safety, Health & Welfare Committee may be prepared and presented (1) orally by the Chairman of the Rescue Commission at a regularly scheduled quarterly meeting of the Committee, after due notice for agenda purposes, or (2) in writing forwarded to the Committee Chairman and Clerk to Council for dissemination to Committee members. Sec. 10-35. – Salaries and funding. Each member of the Rescue Commission shall be paid the sum of $100.00 dollars per year, plus expenses for out-of-county travel, as their sole compensation. Any expense item or claim for same shall first be approved by the Chairman of the Commission, unless the same is made by the Chairman, and submitted for approval and payment to County Council, consistent with the County’s then current budget and procurement policies . In no event shall any member of the Commission be entitled to any other compensation, direct or indirect, for services on the C ommission, and the members of the Commission shall not provide any services, materials, products, goods, or equipment to the County unless the same is sold or offered for sale in accordance with existing County and state purchasing procedures and ethical requirements. 2025-16 STATE OF SOUTH CAROLINA COUNTY OF OCONEE ORDINANCE 2025-16 AN ORDINANCE AMENDING CHAPTER 10 (EMERGENCY MANAGEMENT AND SERVICES) OF THE OCONEE COUNTY CODE OF ORDINANCES BY REVISING THE PROVISIONS OF ARTICLE II.B. “FIRE SERVICE ADVISORY COMMISSION” ; AND OTHER RELATED MATTERS. WHEREAS, consistent with the powers granted county governments by S.C. Code § 4-9- 25 and S.C. Code § 4-9-30, Oconee County (“County”), a body politic and corporate and a political subdivision of the State of South Carolina, acting by and through its governing body, the Oconee County Council (“County Council”), has the authority to enact regulations, resolutions, and ordinances, not inconsistent with the Constitution and the general law of the State of South Carolina, including the exercise of such powers in relation to health and order within its boundaries and respecting any subject as appears to it necessary and proper for the security, general welfare, and convenience of the County or for preserving healt h, peace, order, and good government therein; WHEREAS, the County has adopted multiple ordinances for the effective, efficient governance of the County, which, subsequent to adoption, are codified in the Oconee County Code of Ordinances (“Code of Ordinances”), as amended; and WHEREAS, County Council recognizes that there is a need to revise the law of the County to meet the changing needs of the County, and that there is a need to amend, specifically, Chapter 10 (Emergency Management and Services) of the Oconee County Code of Ordinances by revising the provisions of Article II.B. “Fire Service Advisory Commission” in order to reorganize the Fire Service Advisory Commission, its responsibilities and reporting procedures ; and to affirm and preserve all other provisions of the Code of Ordinances not specifically or by implication amended thereby. NOW, THEREFORE, it is hereby ordained by the Oconee County Council, in meeting duly assembled, that: 1. Article II.B. “Fire Service Advisory Commission” of Chapter 10 ( Emergency Management and Services) of the Oconee County Code of Ordinances is hereby revised, amended, and restated as set forth in Exhibit A, attached hereto and incorporated herein by reference. 2. Should any part or provision of this Ordinance be deemed unconstitutional or unenforceable by a court of competent jurisdiction, such determination shall not affect the rest and remainder of this Ordinance, all of which is hereby deemed separable. 3. All ordinances, orders, resolutions, and actions of County Council inconsistent herewith are, to the extent of such inconsistency only, hereby repealed, revoked, and rescinded. 2025-16 4. All other terms, provisions, and parts of the Code of Ordinances not amended hereby, directly or by implication, shall remain in full force. 5. This Ordinance shall take effect and be in full force from and after third reading and enactment by County Council. ORDAINED in meeting, duly assembled, this ____ of ________________, 2025. ATTEST: Jennifer C. Adams Matthew Durham Clerk to Oconee County Council Chair, Oconee County Council First Reading: August 18, 2025 Second Reading: September 02, 2025 Third Reading: September 16, 2025 Public Hearing: September 16, 2025 ARTICLE II.B. FIRE SERVICE ADVISORY COMMISSION Sec. 10-40. - Purpose of article. The purpose of this article is to restructure the Oconee County Fire Service Advisory Commission, whose mission is to provide a body of active members of the Oconee County fire service to be responsible for guidance, advice, and recommendations to the Oconee County Council (“County Council” or “Council”) on current and future fire service activities and needs in Oconee County (“County”). Sec. 10-41. – Reorganization of the Oconee County Fire Service Advisory Commission. The County Council hereby reorganizes the Oconee County Fire Service Advisory Commission (the “Fire Commission” or “Commission”) as follows: (a) Membership. The Fire Commission shall consist of seven members, all of which shall be entitled to vote on matters brought before the Fire Commission. 1. One member shall be appointed by the Oconee County Fire Chiefs ’ Association, Inc. and one member shall be appointed by the Oconee County Emergency Services Fire Chief , and such members may reside anywhere within the County. 2. County Council shall appoint the remaining five members, with one member to be nominated for appointment by each County Council member from his or her respective district. All members of the Commission appointed by County Council must be, and remain, residents of the County Council district from which they are appointed to serve. 3. All commissioners must remain active fire service members in good standing in Oconee County. 4. Appointment of new members under this ordinance shall be held within forty-five (45) days of the enactment of this ordinance or as soon thereafter as reasonably possible. The Oconee County Fire Service Advisory Commission commissioners that are in office at the time of the enactment of this ordinance shall be succeeded by a new slate of commissioners to be appointed under this section. The current commissioners shall continue to serve, however, until their successors are appointed hereunder, and current commissioners may be appointed to the Commission reorganized hereby. (b) Term of members. 1. The length of the term served by each commissioner appointed by County Council shall be four years, beginning on January 1 of the year of appointment. 2. For the purposes of implementing the standards of this section and thereby establishing a reappointment / replacement schedule of the membership of the Commission to staggered terms, the initial term of all members appointed by County Council after the enactment of this ordinance shall be the same length as the remaining term of the Council member who nominated them. 3. After the initial appointment, the term of each Commission member appointed by County Council shall be four years, equal to and coinciding with the term of the Council member nominating them, with all terms beginning as of January 1 of the year of appointment or reappointment. 4. The Oconee County Fire Chiefs’ Association, Inc. and the Oconee County Emergency Services Fire Chief shall appoint or reappoint their respective commissioners annually. 5. Commissioners ultimately serve at Council’s pleasure and may be removed by Council, with or without cause, by a vote of a positive majority of Council. There are no term limits. Sec. 10-42. – Meetings and officers. (a) The Fire Commission shall meet at least monthly at a time and place selected by the membership thereof or at a place designated by County Council . Within sixty ( 60) days of the passage of this ordinance and the appointment of the Fire Commission members hereunder, or as soon thereafter as reasonably possible, and thereafter during the January meeting of each year, there shall be selected a chairman, a vice-chairman, and a secretary, together with such other officers as the Fire Commission may deem necessary. These officers shall serve for one year, or until their successors are duly elected and qualified. The terms of the officers elected from the initial Commission established after enactment of this ordinance shall end December 31, 2025. (b) In addition, the Fire Commission may adopt such by- laws as it deems necessary for the orderly performance of its duties and functions. Any by- laws which may be adopted by the Fire Commission for the orderly performance of its duties must comply with th is article, all applicable ordinances of the County, and the laws of the State of South Carolina, specifically i ncluding, but not limited to, the Freedom of Information Act. All meetings shall be open to the public. Notice of the meetings shall be given to the Clerk to County Council, the media, and the public in a manner consistent with the Freedom of Information Act. Sec. 10-43. – Powers and duties. The powers and duties of the Fire Commission shall be as follows: (a) To advise the County Council’s Law Enforcement, Public Safety, Health & Welfare Committee (or “Committee”) on matters affecting the operation and activities of the various fire stations and other emergency protection service agencies of the County and to formulate plans and advise the Committee on the operation and maintenance of the fire stations and emergency protection service agencies and their equipment, personnel, and training. (b) To submit its advice and counsel to the Law Enforcement, Public Safety, Health & Welfare Committee in the form of oral and/or written reports for consideration at the Committee’s quarterly meetings, which reports shall summarize the activities, findings, and functions of the Commission, together with the agenda for the Commission’s next meeting, all of which shall be submitted to the chairman of the Law Enforcement, Public Safety, Health & Welfare Committee or his/her designee within a reasonable time prior to the Committee’s respective meeting. (c) To participate in the formulation of the budget and budgetary appropriations affecting the areas of concern of the Fire Commission for County Council consideration. (d) To prepare plans and recommendations to the Law Enforcement, Public Safety, Health & Welfare Committee in the areas of the Commission’s responsibility and activity, with recommendations for the implementation of such plans. (e) To generally advise the County Council’s Law Enforcement, Public Safety, Health & Welfare Committee on any matter within the scope of the Fire Commission’s activities, which would tend to improve the efficiency and beneficial operation of County government in the fields of activity with which the Fire Commission is concerned. (f) Each commissioner appointed by County Council shall visit each fire station within the commissioner’s respective County Council district, and meet with the chief(s) thereof, as frequently as necessary in order to stay informed of the business and operations of such stations. (g) Any advice or recommendations conveyed to the Law Enforcement, Public Safety, Health & Welfare Committee may be prepared and presented (1) orally by the Chairman of the Fire Commission at a regularly scheduled quarterly meeting of the Committee, after due notice for agenda purposes, or (2) in writing forwarded to the Committee Chairman and Clerk to Council for dissemination to Committee members. Sec. 10-44. – Salaries and funding. Each member of the Fire Commission shall be paid the sum of $100.00 dollars per year, plus expenses for out-of-county travel, as their sole compensation. Any expense item or claim for same shall first be approved by the Chairman of the Commission, unless the same is made by the Chairman, and submitted for approval and payment to County Council, consistent with the County’s then current budget and procurement policies . In no event shall any member of the Commission be entitled to any other compensation, direct or indirect, for services on the C ommission, and the members of the Commission shall not provide any services, materials, products, goods, or equipment to the County unless the same is sold or offered for sale in accordance with existing County and state purchasing procedures and ethical requirements. R2025-03 STATE OF SOUTH CAROLINA COUNTY OF OCONEE RESOLUTION 2025-03 A RESOLUTION APPOINTING AND COMMISSIONING THE FOLLOWING PERSONS: TANYA LYNN SPALTI , MEGAN AL YCIA VAN WAGNER, AND MARKEEL DANTONIO DETRO LEONARD AS CODE ENFORCEMENT OFFICERS ( ANIMAL CONTROL) FOR THE PROPER SECURITY, GENERAL WELFARE, AND CONVENIENCE OF OCONEE COUNTY; AND OTHER MATTERS RELATED THERETO. WHEREAS, Oconee County, South Carolina (the “County”) , is a body politic and corporate and a political subdivision of the State of South Carolina; WHEREAS, consistent with the powers granted to county governments by S.C. Code § 4- 9-30 and pursuant to S.C. Code § 4- 9-25, the County has the authority to enact r egulations, resolutions, and ordinances not inconsistent with the Constitution and general law of the State of South Carolina, including the exercise of such powers in relation to health and order within its boundaries and respect ing any subject as appears to be necessary and proper for the security, general welfare, and convenience of the County or for the preservation of health, peace, order, and good government therein; WHEREAS, consistent with S.C. Code §§ 47-3-20 and 4-9-145 and O.C. Code §§ 20-30 through 32, the Oconee County Council (the “Council”) may appoint and commission, by resolution, as many code enforcement officers as may be necessary for the proper security, general welfare, and convenience of the County; and, WHEREAS, in order to promote a clean, healthy, and safe environment for the citizens of Oconee County, the Council deems it proper to appoint and commission code enforcement officers (animal control) authorized to carry out all tasks necessary and incidental to enforce those Oconee County ordinances related to the proper security, general welfare, and convenience of the County in connection with animal control. NOW THEREFORE, be it resolved by Council in meeting duly assembled that: Section 1 . The following persons: Tanya Lynn Spalti, Megan Alycia Van Wagner, and Markeel Dantonio Detro Leonard are hereby appointed and commissioned as code enforcement officers for Oconee County for the purpose of providing for the proper security, general welfare, and convenience of the County, replete with all the powers and duties conferred by law upon constables in addition to such duties as may be imposed by the governing body of the County, and with all the powers and duties conferred pursuant to the provisions of S.C. Code § 4- 9-145. Provided, however, these individuals shall not perform any custodial arrests in the exercise of their duties as code enforcement officers. R2025-03 Section 2. The code enforcement authority possessed by these individuals shall extend throughout the entirety of Oconee County, but such authority shall be limited to enforcing those ordinances and regulations that are related to the proper security, general welfare, and convenience of the County as regards animal control. All enforcement activities shall be conducted in a manner consistent with local, state, and federal law. Section 3. The County Administrator, with the consent of the Oconee County Sheriff, shall execute and provide each code enforcement officer with a C ertificate of Commission and such other credential s as are deemed necessary to serve as evidence of their appointment and commissioning hereby. Section 4. Each of the above-named persons shall serve as code enforcement officers until their appointment and commission is revoked or their employment with Oconee County terminates. Section 5. Should any term, provision, or content of this Resolution be deemed unconstitutional or otherwise unenforceable by a court of competent jurisdiction, such determination shall have no effect on the remainder of this Resolution. Section 6. This Resolution shall take effect and be in force immediately upon enactment. RESOLVED this _____ day of ______________, 2025, in meeting duly assembled. ATTEST: Jennifer C. Adams Matthew Durham Clerk to Oconee County Council Chair, Oconee County Council Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. AGENDA ITEM SUMMARY OCONEE COUNTY, SC COUNCIL MEETING DATE: September 2, 2025 COUNCIL MEETING TIME: 6:00 PM ITEM TITLE OR DESCRIPTION: PRT Commission-Local ATAX Recommendations / Fall 2025 Cycle / $70,000 BACKGROUND OR HISTORY: A portion of Local ATAX revenues received by Oconee County are made available for ATAX grants through Ordinance 2011-12. ATAX grants are to be tourism related grants that meet the ATAX guidelines specified by local and State mandates. Grants are recommended by the PRT Commission based on tourism impact of the project and approved by County Council. All external ATAX grant recipients are required to turn in intermediate reports every 180 days to the progress of the grant and a final report upon completion of the grant. These reports are placed in the grant folder, which is kept active by the PRT staff until the grant is considered complete. Internal projects through Oconee PRT are also funneled through local ATAX for eligible projects. SPECIAL CONSIDERATIONS OR CONCERNS: COMPLETE THIS PORTION FOR ALL PROCUREMENT REQUESTS: Does this request follow Procurement Ordinance #2001-15 guidelines? No [review #2001-15 on Procurement’s website] If no, explain briefly: NO-ATAX grants FINANCIAL IMPACT: Beginning Local ATAX balance $649,588 If all grants/projects approved/new balance will be: $579,588 COMPLETE THIS PORTION FOR ALL GRANT REQUESTS: Are Matching Funds Available: Yes If yes, who is matching and how much: Varies by grant! ATTACHMENTS Spreadsheet approved by PRT Commission on 8.21.25. STAFF RECOMMENDATION: Request approval of local ATAX recommendations per the attached spreadsheet. Reviewed By/ Initials: ______County Attorney ________Finance _________ Grants _______ Procurement Submitted or Prepared By: Approved for Submittal to Council: __Phil Shirley, PRT Director_ __ __________________________________ Department Head/Elected Official Amanda Brock, County Administrator Amount PRT Funds Eligible for Commission Request Project Description ATAX Recommendation City of Seneca $6,000 WSPA Advertising "Race for the Green" $6,000 $4,500 City of Walhalla $10,106 Trails Map/Signage-Stumphouse Mountain Park $10,106 $7,000 City of Westminster $7,709 Sports Complex bleachers $7,709 $7,000 Devils Fork State Park $13,690 Renovate tent impact pads-camping sites $11,768 $6,000 Discover Upcountry SC $15,000 Advertising-Print and Digital $15,000 $6,000 Downtown Seneca Merchants Assoc $1,500 Advertising - Sip-N-Stroll $900 $900 Eagles Nest Arts Center $13,950 Advertising, Maintenance, Electrical, Signage, Suppli $13,950 $6,500 South Carolina Bigfoot Festival $15,000 Advertising, Truss system for stage $15,000 $9,600 The FARM Center $11,517 Advertising, Public Services-Heritage Fair $11,517 $6,000 Walhalla Performing Arts Center $12,000 Advertising 2025/2026 Fall & Winter Season $12,000 $6,000 Westminster Music Centre $10,000 Advertising and Production Concert Series $9,040 $4,000 Wild Hearts Equine Center $9,760 Nature Trail signage & Visitor center creation $9,760 $6,500 TOTAL $126,232 $122,750 $70,000 TOTAL $0 $0 $0 Total Requested $70,000 Sep-25 Local ATAX Grants Applicant PRT Internal Request Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the Administrator for inclusion on an agenda. A calendar with due dates marked may be obtained from the Clerk to Council. AGENDA ITEM SUMMARY OCONEE COUNTY, SC COUNCIL MEETING DATE: September 2, 2025 COUNCIL MEETING TIME: 6:00 PM ITEM TITLE [Brief Statement]: Request for Council’s consideration to support the Oconee County application for the Hazard Mitigation Grant Program application and approval to commit matching funds, not to exceed $11,500, if awarded, for the Oconee County Hazard Mitigation Plan Development project. BACKGROUND DESCRIPTION: • The application is for the development of the Oconee County Hazard Mitigation Plan. • The estimated cost for the project totals $46,000. • The Hazard Mitigation Grant Program has a 25% local match requirement, up to $11,500. • Oconee County currently has a Multi-Jurisdictional Hazard Mitigation Plan with Anderson County, approved in March 2023. • The grant would fund a consultant that would work with Oconee County, local municipalities, community stakeholders and the public to establish the Oconee County Hazard Mitigation Plan, specifically addressing the unique needs of the area. • Oconee County identified the need to establish its own Hazard Mitigation Plan based on various factors: (1) Oconee County has a nuclear power plant and Anderson does not; (2) Oconee County has significant bodies of water, compared to Anderson County, as well as varying terrain; (3) Oconee County has had several declared disasters since 2020, including an EF-3 tornado and Hurricane Helene; and (4) Oconee County has experience significant growth and development in recent years. SPECIAL CONSIDERATIONS OR CONCERNS [only if applicable]: FINANCIAL IMPACT [Brief Statement]: Oconee County requests the commitment of matching local funds, contingent on the award from the Hazard Mitigation Grant Program. ATTACHMENTS: Project Information STAFF RECOMMENDATION [Brief Statement]: It is the staff’s recommendation that Council approve the commitment of matching funds, not to exceed $11,500, toward the Oconee County Hazard Mitigation Grant Program application for the establishment of the Oconee County Hazard Mitigation Plan. Prepared by: Approved for Submittal to Council: __________________________ _____________________________________ Brittney Martin, Grants Administrator Amanda F. Brock, County Administrator Project Information Current planning regulations require specific information be included in local mitigation plans. The following questions address how your community intends to accomplish some of those aspects. For areas where specific strategies have not been determined, please estimate. List all municipalities (county/city) the proposed plan will address. If not multi- jurisdictional, explain why that decision was made. The geographic scope for the plan includes all of Oconee County and includes the incorporated and unincorporated areas. The participating jurisdictions include Salem, Seneca, Walhalla, West Union and Westminster. Oconee County would like to transition away from a multi-jurisdictional plan due to the county- specific terrain and hazards that Oconee County Emergency Services respond to on a regular basis. Oconee County identified the need to establish its own Hazard Mitigation Plan based on various factors: (1) Oconee County has a nuclear power plan and Anderson does not; (2) Oconee County has significant bodies of water, compared to Anderson County, as well as varying terrain; (3) Oconee County has had several declared disasters since 2020, including an EF-3 tornado and Hurricane Helene; and (4) Oconee County has experience significant growth and development in recent years. Oconee County is dedicated to mitigating threats to human life, safety and property. While threats from man-made and natural hazards may never be fully eliminated, Oconee County strives to lessen the potential impacts on our community and citizens through hazard mitigation. This project aims to identify hazards, unique to Oconee County, and develop a plan to comply with DEMA regulations, ensuring continued eligibility for federal disaster assistance and mitigation funding. The plan will also serve as a resource for Oconee County Emergency Services to protect the health and safety of the citizens, residents and visitors in Oconee County. Attach letters of agreement for each jurisdiction involved in the plan (multi-jurisdictional planning only). List the hazards to be addressed (i.e., flooding, earthquake, ice, etc.). Drought Heat Wave Extreme Cold Extreme Heat Severe Thunderstorms Hail Storms Hurricane / Tropical Storms Floods Earthquakes Landslides Erosion Dam and Levee Failure wildfires Winter Storms Tornadoes / High Winds The regulations do not specify inclusion of human- caused hazards (i.e., radiological, hazardous materials, terrorism, etc.), but do encourage the integration of such. If human-caused hazards will be addressed, please list the types you will be studying. Radiological Hazardous Materials Technological Hazards Terrorism Transportation Incident Describe the area and population affected by this project, including location. For multi-jurisdictional planning, specify each jurisdiction's information. Oconee County is 625 square miles and is host to significant environmental resources, including three major lakes, various state and county parks, Sumter National Forest, various wilderness areas and four major rivers. Oconee County adjoins ten other counties across three states and has experienced exponential growth in population and development over the last five years. Oconee County is also home the Oconee Nuclear Stations, Duke Energy's largest nuclear power plant. Oconee County's population is estimated at 82,475 (2024 Census) with 25.4% of the population comprised of people who are 65 or older. The region is primarily rural with small towns and some cities spread throughout the area. Seneca, the largest city in Oconee County has population figures around 8,424. Many of the small towns rely heavily on County government to provide them with technical assistance for planning functions. Oconee County is in the northwest corner of South Carolina. Interstate 85 bisects the region, providing access to many markets in the southeastern United States. Interstate 85 also provides easy access to Charlotte and Atlanta. This is one of the fastest growing regions in the United States. This corridor is characterized by strong economic growth, job creation, and low unemployment. A high quality of life is reflected in lower cost of living standards, affordable home prices, and proximity to many of the recreational amenities people desire. Oconee County is home to KCEU, the Oconee County Regional Airport. The airport services local and private aircrafts along with general aviation airports, and serves as a major destination point for patrons of Clemson University events/football games. Flight instruction is also available at the airport. Rail service in Anderson and Oconee county is provided by CSX Transportation and Norfolk Southern Corporation which operate the first and second longest track routes in the state, respectively. Describe how the community will ensure the planning process will include public involvement and/or comment. Oconee County will host Hazard Mitigation community meetings and workshops and the plan will be presented to Oconee County Council in a public meeting for final approval. Describe how the community will ensure the planning process will include neighboring communities, local and regional agencies involved in hazard mitigation activities, and agencies that have the authority to regulate development, as well as business, academia and other private and non-profit interests involvement. Oconee County and the jurisdictions will work with a consultant to host meetings comprised of representatives from county and municipal departments, as well as other key stakeholders identified, to serve as critical partners in the planning process. Describe how the community will ensure the planning process will include a hazard mitigation planning team that incorporates a broad range of expertise/knowledge of the area(s) involved which will serve an integral part in the plan development phases of risk assessment, vulnerability analysis, mitigation strategy and plan maintenance. The consultant and community stakeholders, county personnel and community members will engage in regular discussions as well as hold local meetings and planning workshops to discuss and complete tasks associated with preparing the Plan. This working group will coordinate on all aspects of plan preparation and provide valuable input to the process. In addition to regular meetings, representatives from the county and jurisdictions will routinely communicate and stay informed through an e-mail distribution list. Describe how the community will ensure the planning process will include review and incorporation, if appropriate, of existing plans, studies, reports, and technical information. The consultant, staff and community stakeholders will review and provide timely comments on all study findings and draft plan deliverables. Describe the Scope of Work (SoW). (Upload supporting documentation via the "Add Document" button in the footer section). This project includes a full establishment of the Oconee County Hazard Mitigation Plan, incorporating new risk assessments, mitigation strategies, and stakeholder engagement specific to Oconee County. Phase 1: Project Initiation & Data Collection Kickoff Meeting Meet with Oconee County officials to outline project scope, expectations, and data needs. Stakeholder Identification Identify key agencies, businesses, and community groups for input. Data Retrieval & Research Gather county- specific hazard data from FEMA, NOAA, USGS, state agencies, and local sources. Gap Analysis Review the existing Anderson-Oconee HMP to determine missing or outdated information. Phase 2: Risk Assessment & Analysis Hazard Identification & Prioritization Assess county-specific hazards, including: Severe Weather (hurricanes, floods, tornadoes) Large Lake & Dam Risks (dam failure scenarios, flooding impacts) Nuclear Facility Hazards (potential incidents, emergency response planning) Social Vulnerability Assessment Identify populations and infrastructure most at risk. GIS Hazard Mapping Develop updated maps to visualize hazard-prone areas. Economic Impact Analysis Estimate potential losses and damages from each hazard. Phase 3: Mitigation Strategy Development Set Mitigation Goals & Objectives Define strategies to reduce disaster risks. Develop & Prioritize Mitigation Actions Identify specific projects, responsible parties, and funding sources. Cost Analysis & Funding Plan Align projects with potential FEMA, state, and local funding opportunities. Integration with Local Planning Efforts Ensure alignment with Oconee County s comprehensive plan, emergency operations plan, and zoning regulations. Phase 4: Public & Stakeholder Engagement Public Meetings & Workshops Facilitate at least two public engagement sessions to gather input. Online Public Survey Collect feedback from residents on hazard concerns and preparedness levels. Agency & SME Consultations Engage with dam operators, nuclear facility representatives, emergency services, and local businesses. Interagency Coordination Work with regional and state partners for consistency and compliance. Phase 5: Plan Drafting, Approval & Adoption Draft HMP Report Develop a full FEMA-compliant hazard mitigation plan. Internal Review & Revisions Work with Oconee County to refi ne content. SCEMD & FEMA Submission Submit the final plan to the South Carolina Emergency Management Division (SCEMD) for initial review, then to FEMA for formal approval. Plan Adoption Present the final, approved plan to Oconee County Council for formal adoption. Describe previous hazard mitigation planning and implementation activities in the community. The most recent hazard mitigation plan was completed in 2023. It has been attached for reference. Enter any additional comments related to the proposed planning effort, if desired. Oconee County Council Oconee County Administrative Offices 415 South Pine Street Walhalla, SC 29691 Phone: 864-718-1023 Fax: 864 718-1024 E-mail: jennifercadams@oconeesc.com John Elliott District I Matthew Durham Chairman District II Don Mize Vice Chairman District III Thomas James District IV J. Glenn Hart Chairman Pro Tem District V The Oconee County Council will meet in 2025 on the first and third Tuesday of each month with the following exceptions: • July, August, and November meetings, which will be only on t he third Tuesday of each of these months; • March, June and December meetings, which will be only on the first Tuesday of each of these months. All Council meetings, unless otherwise noted, are held in Council Chambers, Oconee County Administrative Offices, 415 South Pine Street, Walhalla, South Carolina. Oconee County Council will also hold a Planning Retreat beginning at 9:00 a.m. on Thursday, February 20, 2025 to establish short- and long-term goals. This meeting will be held off-site in the Tri-County Technical College, Oconee Campus, conference room located at 552 Education Way, Westminster, South Carolina. Oconee County Council will also meet on Tuesday, January 6, 2026 in Council Chambers at which point they will establish their 2026 Council and Committee meeting schedules. Additional Council meetings, workshops, and/or committee meetings may be added throughout the year as needed. Oconee County Council Committees will meet in 20 25 prior to County Council meetings on the following dates/times in Council Chambers located at 415 South Pine Street, Walhalla, South Carolina unless otherwise advertised. The Law Enforcement, Public Safety, Health, & Welfare Committee at 4:30 p.m. on the following dates: February 18, May 2 0, July 15, & September 16, 2025. The Transportation Committee at 4:30 p.m. on the following dates: February 18, May 20, July 15, & September 16, 2025. The Real Estate, Facilities, & Land Management Committee at 4:30 p.m. on the following dates: April 1, June 3, August 19, & October 21, 2025. The Planning & Economic Development Committee at 4:30 p.m. on the following dates: April 1, June 3, August 19, & October 21, 2025. The Budget, Fina nce, & Administration Committee at 9:00 a.m. on t he following dates: February 20 [Strategic Planning Retreat] and 4:30 p.m. on the following dates: March 4 [4 p.m.], April 15, & May 6, 2025.

Source: Oconee County website. First collected Nov 7, 2026.