Backup Material
Oconee County · Oconee County · meeting of Sep 2, 2025 · Minutes
Open the original document More from Oconee County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summa ries must be submitted to the
Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all
approvals are obtained prior to submission to the Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
PROCUREMENT - AGENDA ITEM SUMMARY
OCONEE COUNTY, SC
COUNCIL MEETING DATE: September 2, 2025
ITEM TITLE:
Title: INMAR Rigid Hull Dive / Rescue Boat Department(s): Emergency Services Amount: $89,520.91
FINANCIAL IMPACT:
Procurement was approved by Council in Fiscal Year 2025-2026 budget process.
Budget: $89,520.91 Project Cost: $89,520.91 Balance: $0.00 Finance Approval: ________________________________
(Funding from Emergency Services Capital Equipment / Vehicle Fund (335))
BACKGROUND DESCRIPTION:
This rescue boat is a INMAR Dive/Rescue 670R, a 21-foot rigid hull inflatable equipped with a 175hp Suzuki motor. It includes essential features like GPS,
emergency lighting, seating, a front tow post, and a trailer—making it well- suited for fast, efficient response.
This boat will be a valuable addition to the Emergency Services fleet, offering a lightweight, rapid-response option ideally suited for the lakes in Oconee
County. It is especially well-suited for Lake Jocassee, where sudden and severe storm events frequently develop with little to no warning.
This boat would significantly enhance our emergency response capabilities by allowing crews to launch quickly, reach victims faster, and facilitate efficient
recovery operations. While our current fleet includes reliable response boats, they are somewhat limited by their design. This V-hull boat offers greater
stability and improved handling in choppy water conditions compared to the flat-bottom or pontoon boats we currently operate. Its speed and
maneuverability make it ideal for delivering responders swiftly to the scene, allowing triage and life-saving care to begin without delay.
The Fleet Maintenance Director also approves this purchase.
SPECIAL CONSIDERATIONS OR CONCERNS:
The County is utilizing the Sourcewell contract through a cooperative purchasing agreement. Sourcewell contracts are competitively solicited and awarded
on a national level. The Sourcewell contract allows all County Agencies to purchase from this contract, directly from the awarded vendors.
All Hands Fire Equipment, LLC has been awarded Sourcewell Contract No. 020124-ALH for Firefighter Equipment and Rescue Tools. Through this
cooperative purchasing agreement, the County is receiving a 5% discount off the manufacturer’s suggested retail price (MSRP $59,995.00) for the boat.
Additional equipment and accessories are not subject to the discount.
ATTACHMENT(S):
1. Sourcewell Contract 020124-ALH Information
2. Sourcewell Contract Pricing / Discount Sheet
3. All Hands Fire Equipment, LLC Quote Number EST45468
STAFF RECOMMENDATION:
It is the staff’s recommendation that Council approved the purchase of a INMAR Dive / Rescue 670R – 21-foot rigid hull inflatable boat to All Hands Fire
Equipment of Wall, NJ in the amount of $89,520.91, per Sourcewell Contract No. 020124-ALH
Submitted or Prepared By:_______________________________Approved for Submittal to Council: ___________________________________
Tronda C. Popham, Procurement Director Amanda F. Brock, County Administrator
*Volume Discount criteria are based on annual total order volume
All Hands Fire Equipment LLC Contract #020124-ALH Firefigh(ng Equipment and Rescue Tools with Related Supplies and Accessories
Vendor
Sourcewell Discount %
off of List / MSRP
Sourcewell Volume
Discount*
343 Fire 10% 15%
AB Inflatables 5% 10%
Achilles 5% 10%
Affordable Drill Towers 5% 10%
Akron Brass 20% 25%
Alco-Lite 5% 10%
Altek 10% 15%
Anderson Rescue Solutions 10% 15%
Bridgehill 20% 25%
Bulldog Hose Company 10% 15%
CET Fire Pumps 5% 10%
Chemguard 30% 40%
Chief's Choice 5% 10%
Circul-Air (Lockers & Storage) 10% 15%
CMC 10% 15%
Coffee Ostrich 5% 10%
Duo-Safety 5% 10%
ECO CAF 5% 10%
eFireX 5% 10%
Eflare 5% 10%
Elkhart 20% 25%
EMI 20% 25%
Empire Scientific 20% 25%
Fire Hooks Unlimited 5% 10%
Fire Innovations 10% 15%
FireCraft Safety 5% 10%
Firewipes 5% 10%
First Look / Agility Technologies 5% 10%
Force 6 10% 15%
Gemtor 20% 25%
Groves 5% 10%
Husky Portable Containment 25% 30%
Ice Rescue Systems 5% 10%
Inmar 5% 10%
Junkin Safety 10% 15%
JYD Industries 5% 10%
Key Hose 10% 15%
*Volume Discount criteria are based on annual total order volume
Vendor
Sourcewell Discount %
off of List / MSRP
Sourcewell Volume
Discount*
Kochek 25% 30%
Krisis Flood 20% 25%
Li-Cell 5% 10%
Li-fire 20% 25%
LifeVac 5% 10%
Little Giant 5% 10%
Loadmaster 5% 10%
Mad Rock 5% 10%
MK Diamond 10% 15%
National Foam 15% 20%
Niedner / Altra 10% 15%
Nightstick 5% 10%
Obexion FR 5% 10%
PAC / Peformance Advantage Company 5% 10%
Perimeter Solutions / Solberg 15% 20%
Petzl 20% 25%
PIP 10% 15%
Plug N Dike 10% 15%
Power Hawk 5% 10%
R&B Fabrications 10% 15%
ResQtec 10% 15%
Riptide / Hydra-Tap 5% 10%
RIT Safety Solutions 10% 15%
Site Drainer 5% 10%
Skylotec 5% 10%
SMC - Harken Rescue & Safety Brands 10% 15%
Solis Lighting 10% 15%
Steele Solutions 22% 26%
Sterling Rope 20% 25%
Streamlight 5% 10%
Switlik 5% 10%
Syntex Industries 25% 30%
Tempest Technology / Bioex 5% 10%
TNT Tools 25% 30%
Tohatsu 5% 10%
Tractel 5% 10%
Tulmar 5% 10%
Wagonway 5% 10%
Whaly 5% 10%
Wing Inflatabes Inc. 5% 10%
All Hands Fire Equipment
PO Box 1245
Wall NJ 07719
Tel:(732) 502 8060
Fax:(732) 502 8064
www.allhandsfire.com
Quote
Date
8/11/2025
Quote #
EST45468
Bill To
Oconee County Emergency Services
300 S. Church St.
Walhalla SC 29691
Ship To
Oconee County Emergency Services
15026 Wells Highway
Seneca SC 29678
Shipping Code ...Ship Via
FedEx Ground Orde...
Sales Rep
Colarusso, Scott T
Expires
9/10/2025
Account #:
86847
Contract #
Sourcewell 020124-ALH
**We will try to match or beat any price**
Item Name
IMG-670R-DR
IMG-PDI-LARGE
IMG-GPS
IMG-CREE-FRONT
IMG-CREE-REAR
IMG-STROBE
IMG-RS
IMG-FRONTTOW
IMG-SHRINK-Large
IMG-TRAILER
AHF-TARIFF
Qty.
1
1
1
1
1
1
1
1
1
1
1
Description
INMAR Dive / Rescue 670R - 21‘ 10“ Orca Hypalon
Rigid Hull Inflatable Boat With Suzuki 175hp Long
Shaft Motor *Sourcewell 020124-ALH Equipment
& Rescue Tools 5% Off List: $59,995.00*
Inmar PDI Large RIBS (14‘ - 22’)
*PRE DELIVERY INSPECTION
- LARGE RIBS (14‘ - 22’)
- FUEL 20 GALLONS
- OPEN W ATER TEST ( 4 HOURS )
- OIL FILL / MAIN / LOWER
- PREP FOR DIRECT CUSTOMER DELIVERY
Lowrance - GPS / Chartplotter / Fishfinder Combo
Cree Flood Lights Per Pair (installed) FRONT
Cree Flood Lights Per Pair (installed) REAR
Police / EMS Strobe Light Package
Rear Seating (Installed)
Front Tow Post (Only)
Shrink Wrap for transport - Large 17‘ +
Trailer
Tariff *Quoted prices are subject to change if new or
increased tariffs, duties, or import fees are imposed
before delivery.*
Options
Size: Large
Rate
56,995....
750.00
1,764.74
882.99
882.99
3,000.00
2,145.00
1,400.00
500.00
5,499.94
11,700....
Amount
56,995.25
750.00
1,764.74
882.99
882.99
3,000.00
2,145.00
1,400.00
500.00
5,499.94
11,700.00
Subtotal
Shipping Cost (FedEx Ground Orders Over $1000)
Total
85,520.91
4,000.00
$89,520.91
EST45468
Please review your Estimate in great detail to ensure all items, qty., spec, etc. are correct. Please inform us asap if there is an error. Quoted prices
are subject to change if new or increased tariffs, duties, or import fees are imposed before delivery.
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the
Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all
approvals are obtained prior to submission to the Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
PROCUREMENT - AGENDA ITEM SUMMARY
OCONEE COUNTY, SC
COUNCIL MEETING DATE: September 2, 2025
ITEM TITLE:
Title: PO 56366 Goodwyn, Mills & Cawood, Inc. Department: Emergency Services Amount: PO 56366: $ 49,500.00
Change Order No. 1 Change Order 1: $124,000.00
Purchase Order Total: $173,500.00
FINANCIAL IMPACT:
These services qualify for rei mbursement through FEMA Public Assistance, as well as other funding sources identified by Goodwyn, Mills and Cawood,
Inc. The reimbursement amount will be based on expenses approved by FEMA; any expenses not approved will be the responsibility of Oconee County.
BACKGROUND DESCRIPTION:
On July 21, 2020 Council approved the award of RFP 19-10 for Consulting Services for Disaster Recovery and FEMA Public Assistance. This Award provides
support to the County’s Disaster Recovery operations and FEMA Public Assistance preparation to expedite financial recovery and mitigation to minimize impacts
from disasters.
On October 10, 2024, Purchase Order No. 56366 was is sued to Goodwyn Mills and Cawood, Inc. for Task Order #5 related to Hurricane Helene. The purpose of
this purchase order was to provide services in support of data collection and damage assessment/evaluation efforts in regards to Hurricane Helene, which led to the
issuance of a federal d isaster declaration. The total amount authorized under this Task Orde r was not to exceed $49,500 without prior written approval from the
Procurement Department.
Change Order No. 1 to Task Order 5 includes
• Project Formulation & Project Worksheet Preparations to include coordination of project worksheets and ver sions requir ed by SCEMD and FEMA
including scope changes, appeals and assistance with all FEMA public assistance (PA) categories.
• Project Worksheet preparations and Project Mitigation to include assistance to identify potential mitigation projects throughout the damaged area. Once
projects are identified, GMC will provide an engineering cost estimate and develop the proper paperwork required to qualify FEMA 406 and SCEMD 404
mitigation funding for the project in accordance with the Master Contract.
This request is for Council Approval for Change Order No. 1 to Goodwyn Mills and Cawood, Inc. in the amount of $ 124,000.00 for a total Award of $173.500.00
ATTACHMENT(S):
1. Goodwyn, Mills and Cawood, Inc. Task Order No. 5 Amendment No. 1
STAFF RECOMMENDATION:
It is the staff’s recommendation that Council:
1. Approve Change Order No. 1, PO 56366, Work Authorization No. 5, Amendment No. 1, in the amount of 124,000.00, purchase order total
$173,500.00 to Goodwyn, Mills and Cawood, Inc. for professional services related to Hurricane Helene FEMA reimbursement requests.
2. Authorize the County Administrator to execute documents for this change order.
Submitted or Prepared By: _______________________________ Approved for Submittal to Council: __________________________________
Tronda Popham, Procurement Director Amanda F. Brock, County Administrator
TASK ORDER NO. 5, Amendment 1 GMC
Oconee County
Page 1 of 2
The services to be provided under this Task Order shall be in accordance with the terms and conditions of the
Master contract between GMC and Oconee County, dated April 20, 2020. This Task Order only authorizes the
provision of the following services described below for Hurricane Helene. A separate Task Order is required
to provide work on any other project.
Any changes to payment terms must be authorized in writing. Verbal authorizations will not be binding.
Scope of Work: GMC shall provide personnel to support Oconee Co. in the following key functional areas
on an as needed basis:
Scoping and Planning: GMC shall work with the county to understand costs that are eligible for
reimbursement, whether via FEMA, Insurance, HUD or from other sources of funding in accordance
with the Master Contract.
Project Formulation & Project Worksheet Preparations: GMC will coordinate the development
of project worksheets and versions as required by SCEMD and FEMA including scope changes,
appeals, and assistance with all FEMA public assistance (PA) categories in accordance with the
Master Contract in accordance with the Master Contract.
Project Mitigation: GMC will work with the county to identify potential mitigation projects
throughout the damaged area. Once projects are identified, GMC will provide an engineering cost
estimate and develop the proper paperwork required to qualify FEMA 406 and SCEMD 404
mitigation funding for the project in accordance with the Master Contract.
It is anticipated that the quantity of personnel required for each position will vary at different stages of the
project. GMC will assess the quantity of personnel being provided and will adjust staffing levels as necessary.
Any adjustments to staffing levels will be determined by GMC.
Compensation:
On October 10, 2024, Oconee County issued Purchase Order No. 56366 with a Not to Exceed amount of
$49,500.00 to GMC to initiate the FEMA evaluation process. During this time, GMC has worked closely with
both County staff, FEMA staff, and State staff to evaluate damage that impacted Oconee County during
Hurricane Helene. During this time, the GMC staff has been able to identify $3,488,267.57 in damages that
will be submitted to FEMA for reimbursement.
GMC is requesting an increase to the Purchase Order in the amount of $124,000.00 for total compensation of
$173,500. This amount will be compensated for the position and hours of services furnished multiplied by the
rate listed in the Master Contract. GMC Consulting shall not exceed a total cost of one hundred seventy-
three thousand five hundred ($173,500.00) dollars for all project-related labor. This amount will fall
within the 5% Direct Administrative Cost reimbursable by FEMA. Non-labor expenses shall be billed as
follows: 1) Travel expenses including airfare and car rental shall be invoiced at cost, without mark-up; 2)
lodging shall be invoiced up to the per diem rate according to GSA rates; 3) Meals and incidentals shall be
invoiced at the GSA per diem rate (no receipts are required); 4) mileage shall be invoiced at the federal
published rate; 5)Other non-labor expenses as may be applicable to the project and preapproved by GMC and
the county shall be invoiced at cost, without mark-up.
Due to uncertain nature of the scope of the work, scale and duration, the Not-To-Exceed value reflected in the
Task Order is not guaranteed, but only a current estimate of the level of effort expected of GMC.
Client: Oconee County Effective Date: August 25, 2025
Prime: Goodwyn Mills & Cawood Inc. (GMC) Estimated End Date: August 30, 2026
Project: Consulting Services Hurricane Helene Subcontract Type: Time and Materials (T&M)
FEMA PA #: DR-4829-SC
Location: Oconee Co. South Carolina
TASK ORDER NO. 5, Amendment 1 GMC
Oconee County
Page 2 of 2
Invoicing:
GMC shall invoice Oconee Co. for services rendered in accordance with the Master Contract. Each invoice shall
reference the above Project Number.
Acceptance:
OWNER: CONSULTANT:
OCONEE COUNTY GOODWYN MILLS CAWOOD‚ LLC.
Name:___________________________ Name:
____________________
Title:____________________________ Title: _EVP, Disaster Recovery________________
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda
Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each
Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained
prior to submission to the Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
AGENDA ITEM SUMMARY
OCONEE COUNTY, SC
COUNCIL MEETING DATE: __ 09/02/2025_________
COUNCIL MEETING TIME: _____6:00 PM____
ITEM TITLE: [Brief Statement]
Council authorization to reimburse expenditures related to costs associated with the completion of Sewer South
Wastewater Expansion Project Phase II from proceeds of the Series 2023 General Obligation Bond for
expansion to the I-85 Corridor, in the amount of $3,385,903.
BACKGROUND DESCRIPTION:
In September 2023, Oconee County Council approved the issuance of $25,000,000 General Obligation Bond
(Series 2023) to finance the design, acquisition, construction, installation, equipping, and rehabilitation of
various capital sewer infrastructure projects. These include wastewater system improvements, related
equipment, and other infrastructure projects essential to County operations.
The County has incurred a total cost of $7,169,279 associated with this specific infrastructure expansion.
Upon the completion of the project, calculations were established as follows: $1,783,376 in refund from the
OJRSA for required matching funds; and allocated the previously approved ARPA expenditure in the amount of
$2,000,000. There remains $3,385,903 from County funds expended for this phase of Sewer South.
SPECIAL CONSIDERATIONS OR CONCERNS: [only if applicable]
The bond proceeds are designated for eligible expenses or reimbursing previously incurred costs, as authorized
by Council.
FINANCIAL IMPACT:
ATTACHMENTS
- Spreadsheet summarizing eligible expenditures.
- CSI Report / Account Details
STAFF RECOMMENDATIONS:
Staff recommends approval of this reimbursement request in the amount of $3,385,903.
Submitted or Prepared By: Approved for Submittal to Council:
__________________________ _____________________________________
Department Head/Elected Official Amanda F. Brock, County Administrator
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the
Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all
approvals are obtained prior to submission to the Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
PROCUREMENT - AGENDA ITEM SUMMARY
OCONEE COUNTY, SC
COUNCIL MEETING DATE: September 2, 2025
ITEM TITLE:
Procurement #: RFP 25-03 Title: Financial Auditing Services Department: Finance Amount: $66,000.00
FINANCIAL IMPACT:
Procurement was approved by Council in Fiscal Year 2025-2026 budget process.
Budget: $80,000.00 Project Cost: $66,000.00 Balance: $14,000.00 Finance Approval: ______________________________
BACKGROUND DESCRIPTION:
This Request for Proposal was issued to select a firm of Independent Certified Public Accountants to provide auditing and consulting services to Oconee
County beginning with the audit of the 2024-2025 fiscal year. Under South Carolina law, Oconee County must provide an independent annual audit of all
financial records and transactions of the County to be made by a Certified Public Accountant (or firm of such accountants) which has no personal interest,
direct or indirect, in the fiscal affairs of the County or its officers.
On August 14, 2025 formal sealed proposals were opened. A total of thirty-five (35) firms were notified of this solicitation opportunity, and four (4) firms
submitted proposals. An evaluation committee comprised of County Staff reviewed and scored the submissions. Following the evaluation, the committee
recommended CKH CPA’s & Advisors, LLC of Atlanta, GA, for the award.
ATTACHMENT:
1. Summary Score Sheet
STAFF RECOMMENDATION:
It is the staff’s recommendation that Council:
1. Approve the award of RFP 25-03, Financial Auditing Services, to CKH CPA’s & Advisors, LLC of Atlanta, GA, in the amount of $66,000.00.
2. Authorize the County Administrator to renew this contract for up to four (4) one-year terms, as long as the amount does not exceed the amount
budgeted for this service, and the services provided are satisfactory.
Submitted or Prepared By:_______________________________Approved for Submittal to Council: ___________________________________
Tronda C Popham, Procurement Director Amanda F. Brock, County Administrator
RFP 25-03
Open Date: August 14,
2025 @ 2:00pm
Bidders CKH Group Mauldin & Jenkins Perry & Associates,
LLC
Love Bailey &
Associates, LLC
Evaluator 1 487.50 442.50 345.00 302.50
Evaluator 2 345.00 345.00 285.00 287.50
Evaluator 3 412.50 385.00 210.00 200.00
Evaluator 4 410.00 395.00 227.50 205.00
Evaluator 5 487.50 400.00 355.00 360.00
TOTAL RANKING 2142.50 1967.50 1422.50 1355.00
RANKING 1 2 3 4
AVERAGE SCORE 428.50 393.50 284.50 271.00
AVERAGE
RANKING 1 2 3 4
Finacial Auditing
SCORES
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the
Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all
approvals are obtained prior to submission to the Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
ADMINISTRATION - AGENDA ITEM SUMMARY
OCONEE COUNTY, SC COUNCIL MEETING DATE: September 2, 2025
ITEM TITLE:
Title: Request for Council’s approval to commit matching funds in the amount of $124,256.00 toward the Federal Aviation Administration (FAA) Grant
Offer for Airport Improvement Program (AIP) Project No. 3-45-0016-037-2025 and $25,845.00 toward the (FAA) Infrastructure Investment and Jobs Act
(IIJA) - Airport Infrastructure Grant (AIG) Project No. 3 -45-0016-038-2025 for a total of $150,101.00, pending receipt of the official FAA Grant Award
letters and to Authorize the County Administrator to accept and execute all necessary Grant documents pertaining to the Taxiway Pavement
Rehabilitation Construction Project.
FINANCIAL IMPACT:
The total cost for the Taxiway Pavement Rehabilitatio n Construction Project is approximately $6,004,051.00. The Federal Aviation Administration (FAA)
has agreed to fun d ninety-five percent (95%) of the eligible project costs, up to $5,703,849.00, pending receipt of the official Grant Award letters . Oconee
County will provide a local matching share of two and a half percent ( 2.5%) approximately $150,101.00. The remaining two and a half percent (2.5) , also
totaling $150,101.00, will be contributed by the South Carolina Aeronautics Commission (SCAC).
BACKGROUND DESCRIPTION:
On February 1, 2022, Council approved the award of RFP 21-08 for Professional Engineer and Consulting Services for the Oconee County Airport to W.K.
Dickson & Company, Inc., of Columbia SC for a five -year term for services, as needed. In August 2024, W.K. Dickson merged with Ardurra Group, Inc.,
all future work will be carried out under the Ardurra Group name.
• On May 5, 2023, Oconee County submitted a Taxiway Pavement Rehabil itation (Design/Bid) Project Application to the Federal Aviation
Administration (FAA) for funding consideration under the Airport Improvement Program (AIP) and the Airport B ipartisan Law (BIL) / Airport
Infrastructure Grant (AIG) programs.
• On July 31, 20 23, Oconee County received Federal Avi ation Administration (FAA) Grant Offer under the Airport Improveme nt Program Grant
(AIP) Project No. 3-45-0016-035-2023 and the Airport Bipartisan Law (BIL) / Airport Infrastructure Grant (AIG) Project No. 3-45-0016-036-2023
for the Taxiway Pavement Rehabilitation (Design/Bid) Project.
• On August 15, 2023, Council approved the acceptance of Federal Aviation Administration (FAA) Airport Improvement Program (AIP) Grant Offer
Project No. 3-45-0016-035-2023, the Airport Infrastructure Grant Off er Project No. 3-45-0016-036-2023 for the Taxiway Pavement Rehabilitation
(Design & Bidding) along with matching funds.
• On September 19,2023, Council approved the award of Work Authorization #2 (WA#2) to W.K. Dickson, now operating as A rdurra Group LLC.,
Work Authorization #2 included professional serv ices for project management, grant ad ministration, preliminary engineering, design services and
plan preparation (civil and electrical) surveying, geotechnical investigations, engineering design, permitting, and bid phase services.
• Ardurra Group Inc. (formally W.K Dickson) has completed 100% of the Taxiway Pavement Rehabilitation Design, bidding spec ifications, and
plans.
• On April 1, 2025 Council approved submittal of an Airport Improvement Program (AIP) and Airport Bipartisan Law (BIL) / Airport Infrastructure
Grant (AIG) to the Fed eral Aviation Administration (F AA) as well as an application for fund ing to the South Carolina Aviation Association
(SCAA) for the Airport Taxiway Pavement Rehabilitation Construction Project. The FAA Applications were officially submitted on July 3, 2025.
The Oconee County Airport now wishes to accept the Federal Aviatio n Administration Airport Improvement Grant Project No. 3-45-0016-037-20205 and
Infrastructure Investment and Jobs Act (IIJA) – Airport Infrastructure Grant (AIG) Grant Project No. 3- 45-0016-038-2025 for t he Taxiway Pavement
Rehabilitation Construction Project.
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the
Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all
approvals are obtained prior to submission to the Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
SPECIAL CONSIDERATIONS OR CONCERNS:
Oconee County has received an official FAA Grant Award Offer letter for IIJA/AIG Project No. 3-45-0016-038-2025 in the amount of $982,125.00 for the
Taxiway Rehabilitation Construction Project. Airport Director, Mr. Jeff Garrison receiv ed notification from FAA stating the second award offer for Grant
for AIP Project No. 3-45-0016-037-2025 is in process and should be released soon. Timely acceptance of these Grants is crucial to secure FAA funding for
the Taxiway Pavement Rehabilitation Construction Project as the offers must be accepted and submitted to the Federal Aviation Administration no later than
September 5, 2025.
ATTACHMENT(S):
1. Federal Aviation Administration (FAA) IIJA/AIG Project No. 3-45-0016-038-2025 Grant Offer.
2. Federal Aviation Administration (FAA) AIP Project No. 3-45-0016-037-2025 Grant Agreement notification email.
STAFF RECOMMENDATION:
It is the staff’s recommendation to Council:
1. Authorize County Administrator to accept and execute all necessary documents pertainin g to Federal Aviation Adminis tration Airport Improvement
Program (AIP) Grant Offer Project No. 3-45-0016-037-2025 and the Infrastructure Investment and Jobs Act (IIJA)-Airport Infrastructure Grant (AIG)
Project No. 3-45-0016-038-2025 for the Taxiway Pavement Rehabilitation Construction Project.
2. Approve $150,101.00 in matching funds.
Submitted or prepared by: _______________________________ Approved for Submittal to Council: __________________________________
Jeff Garrison, Oconee County Airport Director Amanda F. Brock, County Administrator
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the
Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all
approvals are obtained prior to submission to the Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
PROCUREMENT - AGENDA ITEM SUMMARY
OCONEE COUNTY, SC
COUNCIL MEETING DATE: September 2, 2025
ITEM TITLE:
Procurement #: ITB 24-14 Title: Airport Taxiway Rehabilitation Department: Airport Amount: FAA 95%: $5,270,913.43
State 2.5%: $ 138,708.25
County 2.5%: $ 138,708.25
Project Award: $5,548,329.93
Contingency (15%): $ 832,249.49
Total Award: $6,380,579.42
FINANCIAL IMPACT:
Procurement was approved by Council in Fiscal Year 25-26 budget process.
Budget: $ 6,380,579.42 Project Cost: $6,380,579.42 Balance: $0.00 Finance Approval:
(Funding from Federal Aviation Administration (FAA) - Airport Taxiway Pavement Rehabilitation Grant(s) 95%, South Carolina Aeronautics Commission (SCAC) 2.5%, Oconee County 2.5%)
BACKGROUND DESCRIPTION:
This construction contract consists of furn ishing all labor, materials and equipment needed for the Rehabilitation of the Parallel Taxiway Pavement at the Oconee County
Regional Airport. The existing Taxiway pavement is beyond its usable l ife and rehabilitation is needed. This construction proje ct will consist of removing existing asphalt
pavement and constructing new asphalt pavement throughout the parallel taxiway and connector taxiways located between the Taxiway and the Runway in accord ance with
FAA design and construction requirements.
This bid included f ive (5) different construction variations, each involving different areas and types of work. Bid packages were sh ared with FAA to determine what
elements of the project would ultimately be selected for Funding. Based on prioritization of project needs and available FAA funding, Base Bid Schedule #1 -
Rehabilitation of Taxiway A and Primary Connectors , Bid Additive #1 Demolition and Relocation of Taxiway 3, and Bid Alternate # 1 – Seal Coat of Taxilanes to Aprons
Helo, 1, 2 & 3 have been selected for construction.
On April 2 2, 2025, formal s ealed bids were opened. Twenty-two (22) companies were notified of this bid opportunity. Two (2) companies submitted bids with K west
Group, LLC. Of Perrysburg, OH, submitting the lowest, responsive bid of $5,548,329.93.
SPECIAL CONSIDERATIONS OR CONCERNS:
Ardurra Group, LLC, formerly known as W. K. Dickson, assisted the County in preparing and submitting the grant application(s) requesting funding for this construction.
The grant application(s) were submitted on July 3, 2025. On August 20, 2025 Oconee County Received Infrastructure Investment and Jobs Act (IIJA) – Airport
Infrastructure Grant (AIG) Project No. 3-45-0016-038-2025. This approval request is contingent on receipt of the Grant Award Letter for Airport Improvement Program
Grant (AIP) Project No. 3-45-0016-037-20205 from the FAA.
The FAA will pay 95% ($5,270,913.43) of the actual construction costs; SCAC will pay 2.5% ($138,708.25); and the County will pay 2.5% ($138,708.25). If a change
order is requested and approved by the FAA, the FAA will pay 95%, the SCAC will pay 2.5%, and the County will match 2.5% of said Change Order.
The County is required to provide 2.5% match for this grant. This request includes a request for Council approval to commit matching funds in the amount of $138,708.25
for this project. (Approval to accept grant funding is included on this Council Agenda)
ATTACHMENT(S):
1. Recommendation letter from Ardurra Group, LLC (formerly W. K. Dickson)
2. Official Bid Tab from Ardurra Group, LLC (formerly W.K. Dickson)
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the
Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all
approvals are obtained prior to submission to the Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
STAFF RECOMMENDATION:
It is the staff’s recommendation that Council:
1. Approve the award of ITB 24-14 to Kwest Group, LLC., of Perrysburg, OH in the amount of $5,548,329.93, with a 15% contingency of $832,249.49, for a total
award of $6,380,579.42, pending receipt of grant award.
2. Authorize the County Administrator to execute all necessary documents related to this project an d to approve any change orders within the approved contingency
amount.
Submitted or Prepared By: Approved for Submittal to Council:
Tronda C. Popham, Procurement Director Amanda F. Brock, County Administrator
720 Corporate Center Drive | Raleigh, NC 27607 | 919.782.0495 | www.ardurra.com
August 26, 2025
Ms. Amanda Brock, County Administrator
Oconee County
415 South Pine Street
Walhalla, SC 29691
RE: Oconee County Regional Airport
Taxiway Pavement Rehabilitation
WKD Project No. 20230970.00.RA
Contract Award Recommendation
Dear Ms. Brock,
The bid packages submitted on April 22, 2025 for the Taxiway Pavement Rehabilitation project at the
Oconee County Regional Airport have been reviewed a nd summarized on the enclosed Bid
Tabulation. Two bid proposals were submitted by Kwe st Group, LLC (Kwest) and the Rogers Group,
Inc. Bid packages provided pricing for various bid schedules including base bid work, bid additives
and bid alternates. The bid packages were reviewed for completeness and accuracy and were shared
with FAA to determine what elements of the project would ultimately be selected for funding.
Based on prioritization of project needs and available FAA funding, Base Bid Schedule #1, Bid Additive
#1 and Bid Alternate #1 have been selected for construction. For the selected project elements Kwest
submitted a bid price of $5,548,349.93 and Rogers G roup Inc. submitted a price of $8,292,246.40. A
breakdown of the project elements and prices is also shown below.
Bid Element Kwest Group, LLC Rogers Group, Inc.
Base Bid #1 Taxiway A Pavement Rehabilitation $4,74 4,002.73 $6,309,051.00
Bid Additive #1 Relocation of Taxiway A3 $732,422.2 0 $1,833,852.50
Bid Alternate #1 Seal Coat of Secondary Connectors $71,905.00 $149,342.90
Grand Total $5,548,329.93 $8,292,246.40
As of the date of this letter, Kwest has an active South Carolina general contractor license and is a
pre-qualified SCDOT contractor. Kwest proposal includes a 0.9% Disadvantaged Business Enterprise
(DBE) participation. This participation does not m eet the project goal, however documentation of
good faith efforts spent towards meeting the project goal has been requested.
720 Corporate Center Drive | Raleigh, NC 27607 | 919.782.0495| www.ardurra.com
Based on this information, we recommend that Oconee County award the subject contract in
the amount of $5,548,329.93 to Kwest Group, LLC.
We appreciate the opportunity to provide this service for Oconee County and the Oconee County
Regional Airport, and we are available to answer any questions you may have.
If you have any questions, please contact me at 919-782-0495.
Sincerely,
Ardurra Group Inc.
Jason P. Kennedy, PE
Project Manager
enclosure
cc: Jeff Garrison – Oconee County Regional Airport
Melinda Cox – Oconee County Regional Airport
Tronda Popham – Oconee County
Taxiway Pavement Rehabilitation
WKD NO. 20230970.00.RA
OPENING DATE:
4/22/2025
TIME: 2:00 PM
BID OPENING LOCATION: VIRTUAL &
415 South Pine Street
Walhalla, SC 29691
BIDS OPENED BY: Tronda Popham
ITEMS SELECTED FOR CONSTRUCTION ARE HIGHLIGHTED YELLOW
A B C D E F g H I J
CONTRACTOR LICENSE # and
CLASSIFICATION
ADDENDA #1
ACKNOWLEDGED
SIGNED
BID
FORM
BID BOND
5% DBE %
BASE BID
SCHEDULE #1
Rehab for TWY A & Primary
Connectors
BASE BID
SCHEDULE
#2
Rehab of Apron
Connectors
BASE BID TOTAL
(SCHEDULES
#1+2 )
Rehab of Twy A and all
Connectors
BID
ADDITIVE #1
Demo and Replacement of Twy
A3 - to address direct connect
BASE BID SCH 1 AND 2 + BID
ADDITIVE #1
Rehab of Taxiways and
Relocation of Twy A3
BID
ALTERNATE #1
Seal Coat of Secondary
Connectors instead of Rehab
BASE BID
SCHEDULE #2 PRICE
IF BID ALTERNATE #1 IS
SELECTED
BASE BID WITH BID
ALTERNATE #1 SELECTED
Rehab of TWY A primary
Connectors and Seal Coat of
Apron Connectors
(Column A+G+F)
BASE BID WITH BID ALTERNATE #1
SELECTED & BID ADDITIVE #1
Rehab of TWY A primary Connectors,
Seal Coat of Apron Connectors &
Relocation of Twy A3
BID
ADDITIVE #2
Stub Out for Future
Taxiway Extension
Kwest Group LLC CLG 120118 Yes Yes Yes 0.09% $4,744,002.73 $1,890,199.34 $6,634,202.07 $732, 422.20 $7,366,624.27 $55,284.00 $16,621.00 $4,815,907.73 $5,548,329.93 $564,781.00
Rogers Group Inc. CLG 19294 Yes Yes Yes 3.080% $6,309,051.00 $3,339,949.00 $9,649,000. 00 $1,833,852.50 $11,482,852.50 $138,190.00 $11,152.90 $6,458,393.90 $8,292,246.40 $1,287,395.00
BID TABULATION SUMMARY
BID TABULATION SHEET I Certify that this is a true and corrected
OWNER: record of bids received.
PROJECT:
LOCATION:
415 South Pine Street Jason Kennedy
Walhalla, SC 29691 Ardurra
DATE: 22-Apr-25
Please note that items that have been bolded, highlighted and italicized are mathematical corrections.
Firm: KWEST GROUP, LLC ROGERS GROUP, INC.
Address: 8305 Fremont Pike 1880 S. Hwy 14
Perrysburg, OH 43551 Greer, SC 29650
License Number/Bid Bond GA License No. 120118 GA License No. 119294
BASE BID: SCHEDULE 1 - TAXIWAY A REHABILITATION
1 C-100 Contractor Quality Control Program (CQCP) 1 LS 382,280.00$ 382,280.00$ 536,750.00$ 536,750.00$
2 C-105 Mobilization (10% Maximum) 1 LS 328,640.00$ 328,640.00$ 400,000.00$ 400,000.00$
3 C-102-1 Temporary Stabilized Construction Entrance (Installation, Maintenance, and Removal) 2 EA 5,000.00$ 10,000.00$ 28,275.00$ 56,550.00$
4 C-102-2 Temporary Filter Sock Inlet Protection (Installation, Maintenance, and Removal) 13 EA 155.39$ 2,020.07$ 202.00$ 2,626.00$
5 C-102-3 Temporary SCDOT Type G Suspended Internal Filter (Installation, Maintenance, Removal) 7 EA 339.80$ 2,378.60$ 550.00$ 3,850.00$
6 C-102-4 Temporary Silt Fence (Installation, Maintenance, Removal) 1,100 LF 4.66$ 5,126.00$ 5.50$ 6,050.00$
7 C-102-5 Temporary Grassing including Seed, Lime, Fertilizer and Mulch 1.7 AC 1,035.96$ 1,761.13$ 4,250.00$ 7,225.00$
8 C-102-6 Temporary Slope Drain 0 LF -$ -$ -$ -$
9 P-101-1 Asphalt Profile Milling, Variable Depth 16,800 SY 11.25$ 189,000.00$ 11.25$ 189,000.00$
10 P-101-2 Asphalt Profile Milling, 2" TW A3 1,400 SY 26.75$ 37,450.00$ 26.75$ 37,450.00$
11 P-101-3 Full Depth Pavement Removal 4,900 SY 45.00$ 220,500.00$ 69.25$ 339,325.00$
12 P-101-4 DELETED 0 EA -$ -$ -$
13 P-101-5 Pavement Marking Removal 600 SF 10.00$ 6,000.00$ 8.50$ 5,100.00$
14 P-152-2 Unsuitable Excavation (replace with backfill) 40 CY 72.00$ 2,880.00$ 715.00$ 28,600.00$
15 P-152-3 Embankment in Place. 400 CY 15.00$ 6,000.00$ 180.00$ 72,000.00$
16 P-209-1 Crushed Aggregate Base Course (12" Depth) 1,800 CY 175.00$ 315,000.00$ 422.00$ 759,600.00$
17 P-401-1 Hot Mix Asphalt, Surface Course (4” Depth) 5,300 TON 508.82$ 2,696,746.00$ 473.00$ 2,506,900.00$
18 P-401-2 Hot Mix Asphalt, Surface Course (2" Depth, A3) 170 TON 753.02$ 128,013.40$ 700.00$ 119,000.00$
19 P-602-1 Emulsified Asphalt Prime Coat 6,700 GAL 3.00$ 20,100.00$ 6.00$ 40,200.00$
20 P-603-1 Emulsified Asphalt Tack Coat 1,590 GAL 3.23$ 5,135.70$ 3.00$ 4,770.00$
21 P-605-1 Crack Repair 5,000 LF 2.75$ 13,750.00$ 3.50$ 17,500.00$
22 P-608-1 Asphalt Surface Treatment 1,100 SY 16.35$ 17,985.00$ 11.75$ 12,925.00$
23 P-620-1 Pavement Markings, Temporary, Yellow 5,400 SF 2.00$ 10,800.00$ 5.75$ 31,050.00$
24 P-620-2 Pavement Markings, Permanent, Yellow, reflective, including microbicide 5,400 SF 2.50$ 13,500.00$ 41.50$ 224,100.00$
25 P-620-3 Pavement Markings, Temporary, Black 4,400 SF 2.00$ 8,800.00$ 1.00$ 4,400.00$
26 P-620-4 Pavement Markings, Permanent, Black, including microbicide 4,400 SF 2.00$ 8,800.00$ 1.00$ 4,400.00$
27 P-620-5 Compass Rose Pavement Markings, Permanent, reflective, including microbicide, Geological Survey and demolition 1 LS 6,000.00$ 6,000.00$ 15,000.00$ 15,000.00$
28 P-620-6 Pavement Markings, Temporary, Black - Covering Existing Lead-in Lines 1,100 SF 3.00$ 3,300.00$ 1.00$ 1,100.00$
29 T-901-1 Permanent Grassing (including seed, lime, fertilizer, and mulch) 1.7 AC 4,920.84$ 8,365.43$ 4,450.00$ 7,565.00$
30 T-904-1 Sodding 2,300 SY 8.29$ 19,067.00$ 14.00$ 32,200.00$
31 T-905-1 Topsoiling (stripping, stockpiling and final placement) 40 CY 104.56$ 4,182.40$ 580.00$ 23,200.00$
32 L-105-1 Remove Existing Fixture for Reinstallation, Demolish Anchor/Foundation 29 EA 388.50$ 11,266.50$ 6,780.00$ 196,620.00$
33 L-105-2 Remove Existing Sign for Reinstallation, Demolish Foundation 2 EA 5,051.25$ 10,102.50$ 11,750.00$ 23,500.00$
34 L-105-3 Miscellaneous Electrical Demolition 1 LS 20,269.00$ 20,269.00$ 31,250.00$ 31,250.00$
35 L-108-1 No. 6 AWG, Solid, Bare Counterpoise Wire, Installed in Trench, Above the Duct Bank Or Conduit, Including Ground Rods (Initial and Supplemental) And Ground Connectors3,700 LF 3.11$ 11,507.00$ 4.80 $ 17,760.00$
36 L-108-2 Trench for Cable Installation, including restoration 3,000 LF 3.09$ 9,270.00$ 4.75$ 14,250.00$
UNIT PRICE TOTAL PRICEITEM NO.
PAYMENT
SPECIFICATION DESCRIPTION EST QTY UNIT UNIT PRICE TOTAL PRICE
Oconee County Regional Airport
Taxiway Rehabilitation
Virtual Meeting hosted from Oconee County Office
Bid Tabulation Page 1
WKD # 20230970.00.RA
Oconee County Regional Airport - Taxiway Rehabilitation
5/2/2025
BID TABULATION SHEET I Certify that this is a true and corrected
OWNER: record of bids received.
PROJECT:
LOCATION:
415 South Pine Street Jason Kennedy
Walhalla, SC 29691 Ardurra
DATE: 22-Apr-25
Please note that items that have been bolded, highlighted and italicized are mathematical corrections.
Firm: KWEST GROUP, LLC ROGERS GROUP, INC.
Address: 8305 Fremont Pike 1880 S. Hwy 14
Perrysburg, OH 43551 Greer, SC 29650
License Number/Bid Bond GA License No. 120118 GA License No. 119294
UNIT PRICE TOTAL PRICE ITEM NO.
PAYMENT
SPECIFICATION DESCRIPTION EST QTY UNIT UNIT PRICE TOTAL PRICE
Oconee County Regional Airport
Taxiway Rehabilitation
Virtual Meeting hosted from Oconee County Office
37 L-108-3 No. 8 AWG, 5 kV, L-824, Type C Cable 3,700 LF 2.81 $ 10,397.00 $ 4.35 $ 16,095.00 $
38 L-110-1 2 Way 2-inch Schedule 40 PVC Conduit - Con crete Encased 500 LF 97.50 $ 48,750.00 $ 520.00 $ 260,000.00 $
39 L-115-1 Electrical Junction Can Plaza – 2 L-867D B ase Cans 4 EA 6,457.00 $ 25,828.00 $ 9,950.00 $ 39,800.00 $
40 L-125-1 New L-861T(L) LED Elevated Taxiway Edge Li ght – Base Mounted Installed in Turf 4 EA 2,040.00 $ 8,160.00 $ 3,150.00 $ 12,600.00 $
41 L-125-2 New L-861T(L) LED Elevated Taxiway Edge Li ght – Stake Mounted Installed in Turf 21 EA 1,110.00 $ 23,310.00 $ 1,710.00 $ 35,910.00 $
42 L-125-3 New L-861T Incandescent Elevated Taxiway E dge Light – Stake Mounted Installed in Turf 4 EA 1,110.00 $ 4,440.00 $ 1,710.00 $ 6,840.00 $
43 L-125-5 Relocated L-858 Sign, 3-Module on New Foun dation 2 EA 4,961.00 $ 9,922.00 $ 7,630.00 $ 15,260.00 $
44 P-101 Remove Existing Storm Drainage 2 EA 4,000.00 $ 8,000.00 $ 19,085.00 $ 38,170.00 $
45 D-701 Install New Aircraft Rated Drop Inlet-Comple te 2 EA 25,000.00 $ 50,000.00 $ 50,000.00 $ 100,000.00 $
46 D-751 Install New 24" Class IV RCP 16 LF 1,200.00 $ 19,200.00 $ 785.00 $ 12,560.00 $
4,744,002.73 $ 6,309,051.00 $
BASE BID: SCHEDULE 2 - TAXILANES TO APRONS REHABILITATION
1 C-100 Contractor Quality Control Program (CQCP) 1 LS 52,000.00 $52,000.00 127,850.00 $ 127,850.00 $
2 C-105 Mobilization (10% Maximum) 1 LS 45,400.00 $45,400.00 48,000.00 $ 48,000.00 $
3 C-102-5 Temporary Grassing including Seed, Lime, Fe rtilizer and Mulch 0.6 AC 1,201.52 $720.91 5,425.00 $ 3,255.00 $
4 P-101-1 Full Depth Pavement Removal 4,300 SY 55.52 $238,736.00 79.50 $ 341,850.00 $
4.1 P-101-1 Asphalt Profile Milling, Variable Depth 400 SY 88.00 $35,200.00 88.00 $ 35,200.00 $
5 P-101-5 Pavement Marking Removal 600 SF 10.00 $6,000.00 9.00 $ 5,400.00 $
6 P-152-2 Unsuitable Excavation (replace with backfil l) 100 CY 80.00 $8,000.00 685.00 $ 68,500.00 $
7 P-152-3 Embankment in Place 1,050 CY 20.00 $21,000.00 135.00 $ 141,750.00 $
8 P-209-1 Crushed Aggregate Base Course (12" Depth) 2,100 CY 175.00 $367,500.00 415.00 $ 871,500.00 $
9 P-401-1 Hot Mix Asphalt, Surface Course (4” Depth) 1,600 TON 515.00 $824,000.00 515.00 $ 824,000.00 $
10 P-602-1 Emulsified Asphalt Prime Coat 1,900 GAL 3.00 $5,700.00 6.00 $ 11,400.00 $
11 P-603-1 Emulsified Asphalt Tack Coat 500 GAL 3.00 $1,500.00 3.00 $ 1,500.00 $
12 P-605-2 Joint Sealing 10 LF 300.00 $3,000.00 45.00 $ 450.00 $
13 P-620-1 Pavement Markings, Temporary, Yellow 700 SF 5.00 $3,500.00 6.05 $ 4,235.00 $
14 P-620-2 Pavement Markings, Permanent, Yellow, refl ective, including microbicide 700 SF 5.00 $3,500.00 4.50 $ 3,150.00 $
15 P-620-3 Pavement Markings, Temporary, Black 600 SF 5.00 $3,000.00 1.00 $ 600.00 $
16 P-620-4 Pavement Markings, Permanent, Black, inclu ding microbicide 600 SF 5.00 $3,000.00 1.00 $ 600.00 $
17 T-901-1 Permanent Grassing (including seed, lime, fertilizer, and mulch) 0.6 AC 5,707.23 $3,424.34 6,365.0 0 $ 3,819.00 $
18 T-904-1 Sodding 800 SY 9.61 $7,688.00 19.75 $ 15,800.00 $
19 T-905-1 Topsoiling (stripping, stockpiling and fin al placement) 140 CY 96.99 $13,578.60 635.00 $ 88,900.00 $
20 L-105-1 Remove Existing Fixture for Reinstallation , Demolish Anchor/Foundation 31 EA 384.79 $11,928.49 6,5 75.00 $ 203,825.00 $
21 L-105-3 Miscellaneous Electrical Demolition 1 LS 20,269.00 $20,269.00 33,000.00 $ 33,000.00 $
22 L-108-1 No. 6 AWG, Solid, Bare Counterpoise Wire, Installed in Trench, Above the Duct Bank Or Conduit, Including Ground Rods (Initial and Supplemental) And Ground Connectors 4,200 LF 3.11 $13,062.00 5.10 $ 21,420.00 $
BASE BID TOTAL:
Bid Tabulation Page 2
WKD # 20230970.00.RA
Oconee County Regional Airport - Taxiway Rehabilitation
BID TABULATION SHEET I Certify that this is a true and corrected
OWNER: record of bids received.
PROJECT:
LOCATION:
415 South Pine Street Jason Kennedy
Walhalla, SC 29691 Ardurra
DATE: 22-Apr-25
Please note that items that have been bolded, highlighted and italicized are mathematical corrections.
Firm: KWEST GROUP, LLC ROGERS GROUP, INC.
Address: 8305 Fremont Pike 1880 S. Hwy 14
Perrysburg, OH 43551 Greer, SC 29650
License Number/Bid Bond GA License No. 120118 GA License No. 119294
UNIT PRICE TOTAL PRICE ITEM NO.
PAYMENT
SPECIFICATION DESCRIPTION EST QTY UNIT UNIT PRICE TOTAL PRICE
Oconee County Regional Airport
Taxiway Rehabilitation
Virtual Meeting hosted from Oconee County Office
23 L-108-2 Trench for Cable Installation, including r estoration 3,600 LF 3.09 $11,124.00 5.05 $ 18,180.00 $
24 L-108-3 No. 8 AWG, 5 kV, L-824, Type C Cable 4,100 LF 2.81 $11,521.00 4.60 $ 18,860.00 $
25 L-110-1 2 Way 2-inch Schedule 40 PVC Conduit - Con crete Encased 400 LF 97.50 $39,000.00 560.00 $ 224,000.00 $
26 L-115-1 Electrical Junction Can Plaza – 2 L-867D B ase Cans 8 EA 6,457.00 $51,656.00 10,510.00 $ 84,080.00 $
27 L-125-1 Relocated L-861T Elevated Taxiway Edge Lig ht – Base Mounted Installed in Turf 8 EA 1,861.00 $14,8 88.00 3,030.00 $ 24,240.00 $
28 L-125-2 Relocated L-861T Elevated Taxiway Edge Lig ht – Stake Mounted Installed in Turf 53 EA 929.00 $49,2 37.00 1,515.00 $ 80,295.00 $
29 L-125-6 New L-858(L) LED Sign, 3-Module 3 EA 7,022.00 $21,066.00 11,430.00 $ 34,290.00 $
$1,890,199.34 $3,339,949.00
ITEM NO. SPEC NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TO TAL
1 C-100 Contractor Quality Control Program (CQCP) 1 LS $2,600.00 $2,600.00 $26,350.00 $26,350.00
2 C-105 Mobilization (10% Maximum) 1 LS $3,200.00 $3,200.00 $3,860.00 $3,860.00
3 P-101-5 Pavement Marking Removal 670 SF $11.60 $7,772.00 $29.00 $19,430.00
4 P-608-1 Asphalt Surface Treatment 2200 SY $18.96 $41,712.00 $40.25 $88,550.00
$55,284.00 $138,190.00
ITEM NO. SPEC NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TO TAL
1 C-100 Contractor Quality Control Program (CQCP) 1 LS $35,000.00 $35,000.00 $175,000.00 $175,000.00
2 C-105 Mobilization (10% Maximum) 1 LS $37,120.00 $37,120.00 $150,000.00 $150,000.00
3 C-102-4 Temporary Silt Fence (Installation, Mainte nance, Removal) 1000 LF $4.50 $4,500.00 $6.30 $6,300.00
4 C-102-5 Temporary Grassing including Seed, Lime, Fe rtilizer and Mulch 1.5 AC $1,000.00 $1,500.00 $4,220.00 $ 6,330.00
5 P-101-3 Full Depth Pavement Removal 1700 SY $35.00 $59,500.00 $85.00 $144,500.00
6 P-101-6 Remove Aircraft Tie-Downs 6 EA $300.00 $1,800.00 $1,150.00 $6,900.00
7 P-152-2 Unsuitable Excavation (replace with backfil l) 100 CY $100.00 $10,000.00 $470.00 $47,000.00
8 P-152-3 Embankment in Place 850 CY $20.00 $17,000.00 $185.00 $157,250.00
9 P-209-1 Crushed Aggregate Base Course (12" Depth) 640 CY $175.00 $112,000.00 $456.25 $292,000.00
10 P-401-1 Hot Mix Asphalt, Surface Course (4” Depth) 430 TON $549.50 $236,285.00 $549.50 $236,285.00
11 P-602-1 Emulsified Asphalt Prime Coat 600 GAL $3.00 $1,800.00 $7.00 $4,200.00
12 P-603-1 Emulsified Asphalt Tack Coat 130 GAL $3.00 $390.00 $3.00 $390.00
13 P-620-1 Pavement Markings, Temporary, Yellow 700 SF $5.00 $3,500.00 $6.60 $4,620.00
14 P-620-2 Pavement Markings, Permanent, Yellow, refl ective, including microbicide 700 SF $5.00 $3,500.00 $4 .85 $3,395.00
15 P-620-3 Pavement Markings, Temporary, Black 1000 SF $5.00 $5,000.00 $1.05 $1,050.00
16 P-620-4 Pavement Markings, Permanent, Black, inclu ding microbicide 1000 SF $4.00 $4,000.00 $1.05 $1,050.00
BID ALTERNATE #1 TOTAL:
BID ALT 1: SEAL COAT OF TAXILANES TO APRONS HELO, 1,2, & 3 INSTREAD OF FULL DEPTH RECONSTRUCTION (IF SELECTED)
BID ALTERNATE 1 TOTAL =
BID ADDITIVE 1: DEMOLITION AND RELOCATION OF TAXIWAY 3
Bid Tabulation Page 3
WKD # 20230970.00.RA
Oconee County Regional Airport - Taxiway Rehabilitation
BID TABULATION SHEET I Certify that this is a true and corrected
OWNER: record of bids received.
PROJECT:
LOCATION:
415 South Pine Street Jason Kennedy
Walhalla, SC 29691 Ardurra
DATE: 22-Apr-25
Please note that items that have been bolded, highlighted and italicized are mathematical corrections.
Firm: KWEST GROUP, LLC ROGERS GROUP, INC.
Address: 8305 Fremont Pike 1880 S. Hwy 14
Perrysburg, OH 43551 Greer, SC 29650
License Number/Bid Bond GA License No. 120118 GA License No. 119294
UNIT PRICE TOTAL PRICE ITEM NO.
PAYMENT
SPECIFICATION DESCRIPTION EST QTY UNIT UNIT PRICE TOTAL PRICE
Oconee County Regional Airport
Taxiway Rehabilitation
Virtual Meeting hosted from Oconee County Office
17 T-901-1 Permanent Grassing (including seed, lime, fertilizer, and mulch) 1.5 AC $4,750.00 $7,125.00 $5,095 .00 $7,642.50
18 T-904-1 Sodding 600 SY $8.00 $4,800.00 $23.25 $13,950.00
19 T-905-1 Topsoiling (stripping, stockpiling and fin al placement) 200 CY $74.69 $14,938.00 $150.00 $30,000. 00
20 L-105-1 Remove Existing Fixture for Reinstallation , Demolish Anchor/Foundation 17 EA $338.67 $5,757.39 $7, 650.00 $130,050.00
21 L-105-2 Remove Existing Sign for Reinstallation, D emolish Foundation 3 EA $3,483.27 $10,449.81 $8,335.00 $2 5,005.00
22 L-105-3 Miscellaneous Electrical Demolition 1 LS $20,269.00 $20,269.00 $35,865.00 $35,865.00
23 L-108-1 No. 6 AWG, Solid, Bare Counterpoise Wire, Installed in Trench, Above the Duct Bank Or Conduit, Including Ground Rods (Initial and Supplemental) And Ground Connectors 3000 LF $3.11 $9,330.00 $5.50 $16,500.00
24 L-108-2 Trench for Cable Installation, including r estoration 2600 LF $3.09 $8,034.00 $5.50 $14,300.00
25 L-108-3 No. 8 AWG, 5 kV, L-824, Type C Cable 3900 LF $2.81 $10,959.00 $5.00 $19,500.00
26 L-110-1 2 Way 2-inch Schedule 40 PVC Conduit - Con crete Encased 250 LF $97.50 $24,375.00 $628.00 $157,000.0 0
27 L-115-1 Electrical Junction Can Plaza – 2 L-867D B ase Cans 4 EA $6,457.00 $25,828.00 $11,425.00 $45,700.00
28 L-125-1 New L-861T(L) LED Elevated Taxiway Edge Li ght – Base Mounted Installed in Turf 4 EA $2,040.00 $8, 160.00 $3,610.00 $14,440.00
29 L-125-2 New L-861T(L) LED Elevated Taxiway Edge Li ght – Stake Mounted Installed in Turf 32 EA $1,110.00 $ 35,520.00 $1,965.00 $62,880.00
30 L-125-4 Relocated L-858 Sign, 1-Module on New Foun dation 2 EA $4,109.00 $8,218.00 $7,275.00 $14,550.00
31 L-125-5 Relocated L-858 Sign, 3-Module on New Foun dation 1 EA $5,764.00 $5,764.00 $10,200.00 $10,200.00
$732,422.20 $1,833,852.50 BID ADDITIVE 1 SUBTOTAL=
Bid Tabulation Page 4
WKD # 20230970.00.RA
Oconee County Regional Airport - Taxiway Rehabilitation
BID TABULATION SHEET I Certify that this is a true and corrected
OWNER: record of bids received.
PROJECT:
LOCATION:
415 South Pine Street Jason Kennedy
Walhalla, SC 29691 Ardurra
DATE: 22-Apr-25
Please note that items that have been bolded, highlighted and italicized are mathematical corrections.
Firm: KWEST GROUP, LLC ROGERS GROUP, INC.
Address: 8305 Fremont Pike 1880 S. Hwy 14
Perrysburg, OH 43551 Greer, SC 29650
License Number/Bid Bond GA License No. 120118 GA License No. 119294
UNIT PRICE TOTAL PRICE ITEM NO.
PAYMENT
SPECIFICATION DESCRIPTION EST QTY UNIT UNIT PRICE TOTAL PRICE
Oconee County Regional Airport
Taxiway Rehabilitation
Virtual Meeting hosted from Oconee County Office
ITEM NO. SPEC NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TO TAL
1 C-100 Contractor Quality Control Program (CQCP) 1 LS $45,000.00 $45,000.00 $225,000.00 $225,000.00
2 C-105 Mobilization (10% Maximum) 1 LS $54,600.00 $54,600.00 $100,000.00 $100,000.00
3 C-102-5 Temporary Grassing including Seed, Lime, Fe rtilizer and Mulch 1 AC $1,000.00 $1,000.00 $6,050.00 $6, 050.00
4 C-102-6 Temporary Slope Drain -175 LF $0.00 $0.00 $0.00 $0.00
5 C-102-7 Erosion Control Matting Blanket (Installati on, Maintenance) 2900 SY $8.00 $23,200.00 $5.00 $14,500.0 0
6 C-102-8 Temporary Diversion Ditch and Rock Check Da ms (Installation, Maintenance, Removal) 340 LF $7.00 $2 ,380.00 $200.00 $68,000.00
7 P-101-7 Remove Existing Storm Drainage Structure, C omplete 1 EA $1,500.00 $1,500.00 $6,750.00 $6,750.00
8 P-101-8 Abandon in place Existing Storm Pipe, Compl ete 150 LF $55.00 $8,250.00 $75.00 $11,250.00
9 P-152-1 Borrow Excavation 6300 CY $35.00 $220,500.00 $63.00 $396,900.00
10 P-152-2 Unsuitable Excavation (replace with backfi ll) 10 CY $175.00 $1,750.00 $625.00 $6,250.00
11 P-152-3 Embankment in Place 40 CY $15.00 $600.00 $217.00 $8,680.00
12 P-209-1 Crushed Aggregate Base Course (12" Depth) 200 CY $175.00 $35,000.00 $640.00 $128,000.00
13 P-401-1 Hot Mix Asphalt, Surface Course (4” Depth) 130 TON $1,050.00 $136,500.00 $1,050.00 $136,500.00
14 P-602-1 Emulsified Asphalt Prime Coat 100 GAL $3.00 $300.00 $11.00 $1,100.00
15 P-603-1 Emulsified Asphalt Tack Coat 40 GAL $3.00 $120.00 $3.00 $120.00
16 P-620-1 Pavement Markings, Temporary, Yellow 200 SF $10.00 $2,000.00 $8.00 $1,600.00
17 P-620-2 Pavement Markings, Permanent, Yellow, refl ective, including microbicide 200 SF $10.00 $2,000.00 $ 6.00 $1,200.00
18 T-901-1 Permanent Grassing (including seed, lime, fertilizer, and mulch) 1 AC $4,750.00 $4,750.00 $6,875.0 0 $6,875.00
19 T-904-1 Sodding 125 SY $8.00 $1,000.00 $38.00 $4,750.00
20 T-905-1 Topsoiling (stripping, stockpiling and fin al placement) 50 CY $93.42 $4,671.00 $275.00 $13,750.00
21 L-108-1 No. 6 AWG, Solid, Bare Counterpoise Wire, Installed in Trench, Above the Duct Bank Or Conduit, Including Ground Rods (Initial and Supplemental) And Ground Connectors 900 LF $3.11 $2,799.00 $7.00 $6,300.00
22 L-108-2 Trench for Cable Installation, including r estoration 700 LF $3.09 $2,163.00 $7.00 $4,900.00
23 L-108-3 No. 8 AWG, 5 kV, L-824, Type C Cable 800 LF $2.81 $2,248.00 $7.00 $5,600.00
24 L-110-1 2 Way 2-inch Schedule 40 PVC Conduit - Con crete Encased 150 LF $97.50 $14,625.00 $890.00 $133,500.0 0
25 L-125-2 New L-861T(L) LED Elevated Taxiway Edge Li ght – Stake Mounted Installed in Turf -3 EA $1,110.00 - $3,330.00 $1,150.00 -$3,450.00
26 L-125-7 L-853 Retroreflective Marker - Surface Mou nt 3 EA $385.00 $1,155.00 $1,090.00 $3,270.00
$564,781.00 $1,287,395.00
BID ADDITIVE 2: TAXIWAY A STUBOUT
BID ADDITIVE 2 TOTAL =
Bid Tabulation Page 5
WKD # 20230970.00.RA
Oconee County Regional Airport - Taxiway Rehabilitation
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the
Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all
approvals are obtained prior to submission to the Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
PROCUREMENT - AGENDA ITEM SUMMARY
OCONEE COUNTY, SC
COUNCIL MEETING DATE: September 2, 2025
ITEM TITLE:
Title: Ardurra Group, Inc (formerly W.K. Dickson) Work Authorization #5 Department(s): Airport
(Airport Taxiway Pavement Rehabilitation Construction Phase Services) Amount: FAA 95%: $423,434.94
State 2.5%: $ 11,143.03
County 2.5%: $ 11,143.03
Project Award: $445,721.00
Contingency 15%: $ 66,858.15
Total Award: $512,579.15
FINANCIAL IMPACT:
Procurement was approved by Council in Fiscal Year 2025-2026 budget process.
Budget: $512,579.15 Project Cost: $512,579.15 Balance: $0.00 Finance Approval: ___________________________
(AIP Project No. 3-45-0016-037-2025 & IIJA / AIG Project No. 3-45-0016-038-2025)
BACKGROUND DESCRIPTION:
On February 1, 2022, Council approved the award of RFP 21-08 for Professional Engineering and Consulting Services at the Oconee County Airport to W.K.
Dickson & Company, Inc. of Columbia, SC, for a five-year term on an as-needed basis. In August 2024, W.K. Dickson merged with Ardurra Group, Inc., and all
future work will be carried out under the Ardurra Group name.
The Oconee County Regional Airport now seeks to contract with Ardurra Group, Inc. (formerly W.K. Dickson) to provide professional services for Construction
Administration (CA) and Construction Observation (CO) for the Airport Taxiway Pavement Rehabilitation Project.
• On May 5, 2023 , Oconee County submitted a Taxiway Pavement Rehabilitation (Design/Bid) Project Application to the Federal Aviation Administ ration
(FAA) for funding consideration under the Airport Improvement Program (AIP) and the Airport Bipartisan Law (BIL) / Airport Infrastructure Grant (AIG)
programs.
• On July 31, 2023, Oconee County received Federal Aviation Administration (FAA) Grant Offer under the Airport Improvement Program Grant (AIP)
Project No. 3-45-0016-035-2023 and the Airport Bipartisan Law (BIL) / Airport Infrastructure Grant (AIG) Project No. 3 -45-0016-036-2023 for the
Taxiway Pavement Rehabilitation (Design/Bid) Project.
• On August 15, 2023, Council approved the acceptance of Federal Aviation Administration (FAA) Airport Improvement Program Grant Offer Pr oject No.
3-45-0016-035-2023, the Airport Infrastructure Grant Offer Project No. 3-45-0016-036-2023 for the Taxiway Pavement Rehabilitation (Design & Bidding)
along with matching funds.
• On September 19, 2023, Council approved the award of Work Authorization #2 (WA #2) to W.K. Dickson, now operating as Ardurra Group, LLC. WA #2
includes profe ssional services for project management, gr ant administration, prelimin ary engineering, design services and plan preparation (civil and
electrical), surveying, geotechnical investigations, engineering design, permitting, and bid phase services.
• Ardurra Group, Inc. (formerly W.K. Dickson) , has compl eted 100% of the design, bidding specifications, and plans for the Taxiway Pavement
Rehabilitation project.
• On April 1, 2025 Council approved the submittal of an Airport Improvement Program (AIP) and Airport Bipartisan Law (BIL) / Airport Infrastructure
Grant (AIG) to the Federal Aviation Administration (FAA) as well as an application for funding to the South Carolina Aviation Association (SCAA) for
the Airport Taxiway Pavement Rehabilitation Construction Project. The FAA application(s) were officially submitted on July 3, 2025.
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items Summaries must be submitted to the
Administrator for his review/approval no later than 12 days prior to each Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all
approvals are obtained prior to submission to the Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
Ardurra Group, Inc. Work Authorization WA#5 in the amount of $445,721.00, includes professional services for construction administration (CA) and construction
observation (CO) for the Airport Runway Rehabilitation Construction project.
Staff is requesting a 15% contingency in the amount of $66,858.15 to cover any eng ineering and construction monitoring for additional or unforeseen items that
may come up during the project. If a change order is requested, it would be accepted by the FAA prior to being approved by the County.
SPECIAL CONSIDERATIONS OR CONCERNS:
The grant application(s) were submitted on July 3, 2025. On August 20, 2025 Oconee County Received a Grant Award Agreement for Infrastructure Investment
and Jobs Act (IIJA) – Airport Infrastructure Grant (AIG) Project No. 3-45-0016-038-2025. This approval request is contingent on receipt of the Grant Award Letter
for Airport Improvement Program (AIP) Grant Project No. 3-45-0016-037-20205 from the FAA.
The FAA will pay 95% ($423,434.94) of these costs, the SCAC pays 2.5% ($11,143.03) and the County pays a matching 2.5% ($11,143.03). If a change order is
requested and approved by the FAA, the FAA will pay 95%, the SCAC will pay 2.5% and the County will match 2.5% of said Change Order.
(Approval to accept grant funding is included on this Council Agenda)
ATTACHMENT(S):
1. Work Authorization #5 Ardurra Group, Inc.
STAFF RECOMMENDATION:
It is the staff’s recommendation that Council:
1. Approve Work Authorization #5 from Ardurra Group, Inc. in the amount of $445,721.00 with a 15% contingency of $66,858.15, for a total award of
$512,579.15, pending receipt of grant award.
2. Authorize the County Administrator to execute all necessary documents related to this project and to approve any change orders within the approved
contingency amount.
Submitted or Prepared By: _______________________________ Approved for Submittal to Council: __________________________________
Tronda C. Popham, Procurement Director Amanda F. Brock, County Administrator
Oconee County Regional Airport (CEU)
Taxiway Pavement Rehab. Construction Phase
Work Authorization # 5
Page 1
WORK AUTHORIZATION # 5
May 15, 2025
IN ACCORDANCE WITH
GENERAL SERVICES AGREEMENT FOR PROFESSIONAL
SERVICES BETWEEN OWNER AND CONSULTANT
Dated: February 2, 2022
TAXIWAY PAVEMENT REHABILITATION
CONSTRUCTION PHASE SERVICES (AGREEMENT)
Oconee County Airport (CEU), Seneca, South Carolina
This Work Authorization, made and entered into this ____day of , 2025, by and
between the OWNER:
Oconee County
415 South Pine Street,
Walhalla, South Carolina 29691
and the CONSULTANT:
Ardurra Group, Inc.
1320 Main Street, Suite 400
Columbia, South Carolina 29201
Amends the AGREEMENT executed by and between the pa rties hereto on the 2 nd day of February
2022, into which this Work Authorization is hereby incorporated and made a part hereof, to specify
the following:
Project Overview
The OWNER wishes the CONSULTANT to provide construc tion phase services including project
management and grant administration, construction a dministration, construction observation
(CA/CO), Quality Assurance Testing and Erosion Cont rol Inspection services related to the
construction of the rehabilitation and reconstruction of the Taxiway Pavement at the Oconee County
Regional Airport (CEU). Design and bidding for thi s project was previously completed by the
CONSULTANT as defined in Work Authorization #2 dated September 21, 2023. These services are
described in further detail below. The improvements include the rehabilitation and reconstruction
of TW A from A1 through A4, relocation of Taxiway A 3 and a portion of the main apron as shown
on the enclosed Exhibit A.
The OWNER also wishes the CONSULTANT to provide a 3 -year Disadvantaged Business
Enterprise (DBE) plan. This plan will provide the three-year DBE Overall Goal and Methodology for
Oconee County Airport, based on projects proposed for fiscal years 2025 through 2027.
Oconee County Regional Airport (CEU)
Taxiway Pavement Rehab. Construction Phase
Work Authorization # 5
Page 2
This scope of services is based on the anticipated project duration of 175 consecutive calendar days
consisting of 30 days of preconstruction, 100 days of construction and 45 days for closeout.
Scope of Services
1. BASIC SERVICES
A. Project Management and Grant Administration
The CONSULTANT shall provide the following work tasks
i. Project Formulation
a. Develop the necessary scopes of work and work authorizations.
b. Review Work Authorization with FAA and SCAC and address comments
ii. Project Management
a. Routine Project Management Tasks (Invoicing, Scheduling, etc.)
b. Subconsultant invoice processing and management
c. Routine monthly coordination with OWNER for invoicing
iii. Grant Management
a. Prepare pre-application and final grant application packages for FAA and
SCAC
b. Coordinate with the Federal Aviation Administration (FAA) and the
South Carolina Aviation Commission (SCAC).
c. Assist the OWNER with preparation of monthly grant draw requests to the
FAA and SCAC, assume 7
d. Assist the OWNER with preparation of Quarterly reporting to the FAA.
e. Prepare Grant close-out documentation and submittal to FAA and SCAC.
B. Construction Administration (Civil)
The CONSULTANT will provide the following elements:
i. Prepare conformed construction documents and publish Issued for Construction set
ii. Prepare the conformed contract for routing to contr actor. Review and recommend
execution of the conformed contract to the OWNER.
iii. Prepare and submit to the FAA for review and approv al, a Construction
Management Program in accordance with AC 150/5370-12B.
iv. Prepare for, attend, and conduct one pre-constructi on meeting, including field
review of construction elements and project sites and the subsequent preparation and
distribution of meeting minutes.
v. Prepare for, travel to, conduct and issue meeting minutes for, up to Eight (8) in person
bi-weekly construction progress meetings. After each in-person progress meeting a
Oconee County Regional Airport (CEU)
Taxiway Pavement Rehab. Construction Phase
Work Authorization # 5
Page 3
site visit will be conducted by an experienced and qualified design professional, to
observe progress and quality of the executed work of Contractor and to determine in
general if such work is proceeding in accordance with the contract documents.
vi. Review and take appropriate action in respect to shop drawings, samples, results of
tests and inspections and other data which each Contractor is required to submit.
vii. Review and process contractor pay requests and recommend payment to OWNER.
viii. Provide ongoing consultation to the OWNER regarding status of construction and
facilitate communication with the contractor.
ix. Provide ongoing coordination of work performed by subconsultants
x. Review and provide responses to Request for Informa tion (RFI’s) submitted by the
contractor.
xi. Attend Pre-paving conference conducted by contractor.
xii. Conduct site visit/inspections for critical constru ction milestones (e.g. inspection of
milled pavement surface prior to paving, observatio n of test strip for Asphalt
Pavement (P-401) inspection of taxiway prior to reopening).
xiii. Make recommendations to the OWNER regarding contrac t change orders.
Preparation of Change Order documents if required.
xiv. Review contractor’s initial project schedule and monitor construction progress.
xv. Conduct a visit to determine if the Project is subs tantially complete determine if the
work has been completed in accordance with the contract documents and determine
if Contractor has fulfilled all of his obligations thereunder so that ENGINEER may
recommend, in writing, final payment to Contractor and may give written notice to
OWNER and the Contractor that the work is acceptabl e (subject to any conditions
therein expressed). One initial inspection to be pe rformed for each phase of the
project
xvi. Develop and distribute punch list inspection and si te report to OWNER and
Contractor. One inspection to be performed for each phase of the project
xvii. Conduct a visit to determine if the Project is at f inal completion to determine if the
work has been completed in accordance with the contract documents and determine
if Contractor has fulfilled all of his obligations thereunder so that ENGINEER may
recommend, in writing, final payment to Contractor and may give written notice to
OWNER and the Contractor that the work is acceptabl e (subject to any conditions
therein expressed). One final inspection to be performed for each phase of the project
xviii. Review contractor’s final pay application & require d project close-out documents.
Provided all punch list items are properly addresse d by the contractor, recommend
payment of final pay application to the contractor by the OWNER.
xix. Coordinate the compiling Final Engineer Report and As-built/Record Drawings.
Oconee County Regional Airport (CEU)
Taxiway Pavement Rehab. Construction Phase
Work Authorization # 5
Page 4
C. Construction Administration (Electrical)
Construction Administration for electrical work ite ms will be provided by a subconsultant,
Walls Engineering, PLLC. to the CONSULTANT and will include the following:
i. Attend bi-weekly meetings virtually, assume 8 meetings
ii. Review and take appropriate action in respect to el ectrical related shop drawings,
samples, results of tests and inspections and other data which each Contractor is
required to submit.
iii. Review and provide responses to electrical related Request for Information (RFI’s)
submitted by the contractor.
iv. Conduct two (2) site visit/inspections with OWNER for visual review of construction
activities
v. Make recommendations to the CONSULTANT regarding contract change orders.
vi. Attend the pre-final inspection.
vii. Prepare an inspection report and punch list for electrical work items.
viii. Attended final inspection.
Additional details for this element of work may be found in Attachment C.
D. DBE Plan 3-year Update
Consultant will prepare a Three-Year DBE Plan Updat e. This task includes planning services
required by the FAA to develop the updated three-ye ar DBE Overall Goal and Methodology
for Oconee County Airport, based on projects propos ed for fiscal years 2025 through 2027.
Subtasks associated with this work generally include the following:
i. Develop FY 2025-2027 Goals & Methodology;
ii. Develop narrative text to update administrative document;
iii. Compile available historic bid info & other DBE-related documents;
iv. Prepare preliminary engineering cost estimates for FY 2025-2027 projects;
v. Review proposed goal & methodology with Sponsor;
vi. Coordinate submittal to FAA Civil Rights Office, their review & approval.
This task has a separate timeline from the other Taxiway Rehabilitation work defined within
this Work Authorization. Anticipated schedule for this work is three months from the notice
to proceed to realizing FAA Civil Rights Office approval.
2. SPECIAL SERVICES
A. Construction Observation (CO) / Resident Project Representative (RPR)
The CONSULTANT is to provide the following elements:
i. Provide a full-time representative to perform on-site construction observation of the
proposed construction activities (i.e., resident pr oject representative services) for a
duration of 100 calendar days (10 hours per workday/5 workdays per week).
Oconee County Regional Airport (CEU)
Taxiway Pavement Rehab. Construction Phase
Work Authorization # 5
Page 5
ii. The responsibilities and limitations of the CO/RPR services shall conform to Section
IV of the AGREEMENT.
iii. Attend pre-construction meeting, including review o f construction elements and
project sites.
iv. Prepare daily construction observation reports.
v. Conduct wage rate interviews of contractor and subcontractor personnel.
vi. Attend bi-weekly construction progress meetings, tw o (2) meetings per month are
accounted for in this scope of work.
vii. Review completed pay item quantities with contractor prior to contractor’s submittal
of a pay request.
viii. Monitor contractor’s project schedule.
ix. Attend a pre-final inspection.
x. Assist with preparation of inspection report and final punch list.
xi. Attend a final inspection to confirm all punch list items have been addressed.
B. Quality Assurance Testing
The CONSULTANT shall provide quality assurance test ing for the proposed construction.
Testing shall be conducted and documented in accord ance with the construction contract for
embankment (P-152), subbase (P-154), aggregate base course material (P-209) and asphalt
pavement (P-401). Services shall include testing of the following items:
i. Excavation and Embankment (P-152)
ii. Aggregate Base Course (P-209)
iii. Asphalt Paving (P-401)
This service shall be completed by a sub consultant to the CONSULTANT, S&ME, Inc.
Additional details for this element of work may be found in Attachment D.
C. Erosion Control Inspection & Reporting
The CONSULTANT shall provide the following services to support compliance with the
project Erosion and Sedimentation Control Permit issued by SCDES.
i. Provide notification to SCHEC prior to start of construction indicating start of work and
anticipated project schedule.
ii. Conduct weekly erosion control inspection and reporting for a duration of 100 calendar
days. Erosion control inspections will be perform ed weekly by a Certified Erosion
Prevention & Sediment Control Inspector (CEPSCI).
iii. Report inspection findings to the contractor when i ssues requiring corrective actions
are observed.
iv. Conduct site visits to observe the completion of corrective actions.
v. Communicate with the contractor to collect informat ion needed to document the
completion of corrective actions.
vi. Upon completion of construction, submit request for permit termination and close out
to SCDES.
Oconee County Regional Airport (CEU)
Taxiway Pavement Rehab. Construction Phase
Work Authorization # 5
Page 6
to SCDES.
This service shall be completed by a sub consultant to the CONSULTANT, S&ME, Inc.
Additional details for this element of work may be found in Attachment D.
DELIVERABLES: The CONSULTANT will provide the following project deliverables to the OWNER:
1. Copy of Final Inspection Report and Punchlist
2. Photos of completed project
3. Final Report of Construction, and as-builts drawings
FEE SCHEDULE
1. BASIC SERVICES
A. Project Management & Grant Admin. Lump Sum $ 33,0 07.00
B. Construction Administration (Civil) Lump Sum $ 1 61,114.00
C. Construction Administration (Electrical) HNTE $ 35,645.00
D. DBE 3-Year Update Lump Sum $ 15,242.00
Basic Services Subtotal $245,008.00
2. SPECIAL SERVICES
A. Construction Observation HNTE $128,571.00
B. Quality Assurance Testing Cost $59,749.00
C. Erosion Control Inspection & Reporting Cost $12,393 .00
Special Services Subtotal $ 200,713.00
WORK AUTHORIZATION # 5 TOTAL $445,721.00
COMPENSATION
The total fee of all work and expenses is in the amount of $445,721.00. Miscellaneous additional work
required but not contained in the above scope of se rvices will be paid for in accordance with the
current rate schedule at that time and will be subject to prior approval by the OWNER.
PROJECT SCHEDULE
The timing of the project is dependent upon FAA fun ding and availability of the selected General
Oconee County Regional Airport (CEU)
Taxiway Pavement Rehab. Construction Phase
Work Authorization # 5
Page 7
for the execution of the defined project tasks. Work task durations and level of effort are an estimate and
reflect what is typical and standard for this type of construction project. This scope assumes typical
preconstruction coordination with the Owner and Contractor for a duration of approximately 30 days
prior to Notice to Proceed (NTP), 100 calendar days of construction and 45 days after the completion of
construction for coordination with the Owner and Contractor for completion of punch list work and
preparation of contract and grant close out documentation.
Project factors such as the availability of labor, materials, and the selected contractor’s ability to
complete the work within the approved project schedule is outside the control of the
CONSULTANT.
ADDITIONAL SERVICES
The OWNER shall pay the CONSULTANT for additional services, which are not specifically called
for in the above Scope of Services, in accordance w ith the CONSULTANT’S rate schedule in effect
at the time; and will be subject to prior approval by the OWNER.
All services and compensation under this Work Authorization No. 5 shall be in accordance with the
Master Agreement (Contract for Professional Services) dated February 2, 2022.
IN WITNESS WHEREOF, the parties hereto have made an d executed this Contract as of the date
and year first written above.
OWNER : CONSULTANT :
OCONEE COUNTY, SOUTH CAROLINA ARDURRA, INC.
By:
By:
Christopher Birkmeyer, P.E.
Aviation South Group Leader
Date: Date:
List of Attachments
Exhibit A: Project Exhibit
Attachment A: Hour Summary and Fee Estimate
Attachment B: Expense Summary
Attachment C: Subconsultant Proposal for Electrica l Construction Administration
Attachment D: Subconsultant Proposal for Quality A ssurance and Erosion Control Inspection
X X
X
X
X
XXXXXXXXX
X
XXXXXXXXXXXXX
X
X X X X X X X X X X X X
X X X X X X X X X XX X
JPKACCDHJUNE 2025EXHIBIT A202309700.01.RA
FILE PATH:Z:\Projects\Oconee County SC\2023097000RA - CEU WA2 Taxiway Pavement Rehabilitation\CADD\Plan Set\Exhibits\2025-06-05 Taxiway Rehab Rev.dwgZ:\Projects\Oconee County SC\2023097000RA - CEU WA2 Taxiway Pavement Rehabilitation\CADD\Plan Set\Exhibits\2025-06-05 Taxiway Rehab Rev.dwg, CHARRISON, 6/5/2025 4:39:38 PMCOPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. THIS DRAWING IS AN INSTRUMENT OF SERVICE AND SHALL REMAIN THE PROPERTYOF THE ENGINEER AND SHALL NOT BE COPIED, REPRODUCED, PUBLISHED, OR USED IN ANY WAY WITHOUT THE EXPRESS WRITTEN AUTHORIZATION OFTHE ENGINEER. ONLY COPIES MARKED WITH AN ORIGINAL SIGNATURE AND SEAL OF THE ENGINEER SHALL BE CONSIDERED VALID, TRUE COPIES.
WKD PROJ. NO.:PROJECT NAME:
DRAWING NUMBER:
DRAWING TITLE:
REVISION RECORD
DESCRIPTIONBYDATE
PROJ. DATE:PROJ. MGR.:DESIGN BY:DRAWN BY:
NO.
PROFESSIONAL SEALOCONEE COUNTY REGIONAL AIRPORT (CEU)SENECA, SOUTH CAROLINATAXIWAY PAVEMENT REHABILITATIONPROJECT EXHIBIT
EXHIBIT DRAWING - NOT FOR CONSTRUCTION
LEGEND
TAXIWAY REHABILITATION0200200400GRAPHIC SCALE: 1" = 200'100
RUNWAY 7/25TAXIWAY 'A'
RELOCATED TAXIWAYCONNECTOR TO ADDRESSDIRECT CONNECTION
TAXIWAY CONNECTOR SEAL COATTAXIWAY CONNECTOR REMOVAL TO ADDRESS DIRECT CONNECTIONRELOCATED TAXIWAY CONNECTOR TO ADDRESS DIRECT CONNECTION
TAXIWAY SEAL COATTAXIWAY SEAL COAT
TAXIWAY CONNECTORREMOVAL TO ADDRESS DIRECTCONNECTION
A-2
A-3
A-3
A-4 A-5
720 CORPORATE CENTER DRRALEIGH, NC 27607(t)919-782-0495(f)919-782-9672WWW.ARDURRA.COMNC LICENSE NO.F-0374
DATE PREPARED: 06-10-2025
WBS NUMBER:
SUB-
TOTAL
PHASE AND TASK DESCRIPTION Principal Senior Project Project Aviation Senior Aviation Construction Admin.
Manager Manager Engineer Designer Planner Observer
Basic Services
A. Project Management and Grant Administration
Estimated duration 30 days pre-con,100 calendar days, 4 5 days closeout - 175
days/6 months/ 25 weeks
a Project Formulation
i. Develop Work Authorization 2 2 4 4 2,572.25 $
i. Work Authorization review with FAA & SCAC and addr essing comments 2 2 2 2 1,887.53 $
b Project Management
i. Routine Management Tasks (Invoicing, Scheduling, etc) 8 2 12 6 6,756.33 $
ii. Subconsultant Management for invoicing 12 12 4,108.33 $
iii. Routine monthly coordination with OWNER for invo icing 12 3 3,303.94 $
c Grant Management
i. Prepare pre-application and final grant application packages 1 8 4 2 2,873.71 $
ii. Coordination with FAA and SCAC 1 4 1,161.91 $
iii. Monthly Grant Draw Requests (7) 1 8 14 4,070.46 $
iv. Assist with Quarterly Grant Reporting 1 1 4 1,045.26 $
v. Grant Close-out Documentation 1 2 8 12 4,387.07 $
Task Subtotal 13 24 59 0 0 34 0 29 32,166.80 $
B. Construction Administration (Civil)
Estimate Duration 175 days
(30 days preconstruction, 100 Construction, 45 Days closeout: 6 months )
i. Prepare conformed construction documents and
publish Issued for Construction set 8 20 40 2 12,843.09 $
ii. Prepare conformed construction contract, recommend execution by owner 2 2 684.72 $
iii. Preparation of Construction Management Program (5370- 12B) 2 8 30 6 9,401.30 $
iv. Prepare, Attend, Conduct and Issue Minutes for One (1) Pre-Con Meeting 8 4 2 2,881.29 $
v. Routine Progress Mtg, Prep, conduct, Issue Minutes ( 8 meetings) 80 16 21,596.02 $
vi. Shop Drawing Review (assume 25) 8 50 12,131.10 $
vii. Review Contractor Pay Request (assumes 6) 6 18 14 6,671.50 $
viii. Ongoing Consultation to the Owner throughout Constructi on (4 hours/week) 4 60 15,142.67 $
ix. Coordination of work preformed by subconsultants 2 30 8 9,219.51 $
x. Review and Response to Contractor RFIs (assume 10) 8 30 8,010.65 $
xi. Attend two Pre-paving conference conducted by Contract or (one for each phase) 16 4 4,484.02 $
xii. Conduct site visits for critical construction milestones (assumes 2) 16 16 6,956.29 $
xiii. Change Order, recommendations and document preparati on (assume 2) 4 16 24 8 10,931.32 $
xiv. Review Contractor's project schedule and monitor thr ough construction 20 4,574.91 $
xv. Conduct pre-final inspection (1 inspection per phase,( 2 inspections) 12 12 5,217.22 $
xvi. Prepare and distribute pre-final inspection report and punch list (2 inspections) 2 8 2,105.67 $
xvii. Conduct final inspection (1 inspection per phase) (2 inspections) 12 12 5,217.22 $
xviii. Review Contractors Final Pay Request and required close out documents 4 4 1,369.44 $
xix. Project & Grant close out documentation (Record Dr awings and Final Report) 2 12 20 40 10 15,375.96 $
Task Subtotal 14 0 328 272 80 0 0 48 154,813.91 $
ATTACHMENT 'A'
PROJECT DESCRIPTION: CEU Taxiway Pavement Rehab (Con struction Phase)
PREPARED BY: Kristopher Erwin & Jason Kennedy / Ardur ra Group, Inc.
TASK NUMBER Employee Classifications
C. Construction Administration (Electrical)
Construction Administration 35,645.00 $
Task Subtotal 0 0 0 0 0 0 0 0 35,645.00 $
D. DBE 3-Yr Update
i. Develop FY 2025-2027 Goals & Methodology 2 6 18 8 5,662.59 $
ii. Develop Narrative Document to Update 2 8 2 1,860.26 $
iii. Compile Historic Bid Info & Other DBE Related Documents 2 2 4 2 1,623.94 $
iv. Prepare Preliminary Engineering Cost Ests. for FY 2025-2027 Projects 2 6 2 1,778.46 $
v. Review Proposed Goal & Methodology with OWNER 6 4 2,051.14 $
vi. Coordinate Submittal to FAA Civil Rights Office, Their Review & Approval 2 4 4 2,266.25 $
Task Subtotal 4 22 0 0 8 40 0 12 15,242.65 $
Special Services
A. Construction Observation/ Resident Project Representa tive (RPR)
i. Full Time RPR 100 calendar days, 15 weeks, 50hr/week 750 109,070.82 $
Task Subtotal 0 0 0 0 0 0 750 0 109,070.82 $
B. Quality Assurance Testing
i. Quality Assurance Testing (S&ME) 59,748.60 $
Task Subtotal 0 0 0 0 0 0 0 0 59,748.60 $
C. Erosion Control Inspections & Reporting
i. Erosion Control Inspections & Reporting 12,393.00 $
Task Subtotal 0 0 0 0 0 0 0 0 12,393.00 $
TOTAL HOURS/CATEGORY: 31.00 46.00 387.00 272.00 88.00 74.00 750.00 89.00 419,080.78 $
RATES PER HOUR: 117.00 $ 81.50 $ 75.50 $ 68.00 $ 55.00 $ 47.00 $ 48.00 $ 37.50 $
PAYROLL BURDEN: 3,627.00 $ 3,749.00 $ 29,218.50 $ 18,496.00 $ 4,840.00 $ 3,478.00 $ 36,000.00 $ 3,337.50 $
TOTAL WORK HOURS: 1,737.00
TOTAL PAYROLL BURDEN: 102,746.00 $
GENERAL OVERHEAD @ 172.51%: 177,247.12 $ Task Breakdown Labor Expense Rounded Total
Cost of Capital @ 0.44 % 452.08 $ Basic A. Project Management and Grant Administration 32,166.80 $ 840.00 $ 33,007.00 $
PAYROLL SUBTOTAL: 280,445.21 $ B. Construction Administration (Civil) 154,813.91 $ 6,300.00 $ 161,114.00 $
COMPARATIVE FEE @ 11%: 30,848.97 $ C. Construction Administration (Electrical) 35,645.00 $ -$ 35,645.00 $
TOTAL: 311,294.18 $ D. DBE 3-Yr Update 15,242.65 $ 15,242.00 $
DIRECT EXPENSES: 26,640.00 $ Special A. Construction Observation (RPR) 109,070.82 $ 19,500.00 $ 128,571.00 $
PRIME GRAND TOTAL: 337,934.18 $ B. Quality Assurance Testing 59,748.60 $ -$ 59,749.00 $
SUBCONSULTANT TOTAL 107,786.60 $ C. Erosion Control Inspections and Reporting 12,393.00 $ -$ 12,393.00 $
GRAND TOTAL 445,721.00 $
See Proposal
See Proposal
See Proposal
GRAND TOTAL: 445,720.78 $
GENERAL PROJECT
WORK:
ITEM QTY DESCRIPTION UNIT COST
A. Project Management and Grant Admin.
2 Trip(s) @ 600 miles @ $0.700 $840.00
A. Project Management and Grant Admin. $840.00
B. Construction Administration*
Pre Construction Meeting 1 Trip(s) @ 600 miles @ $0.700 $420.00
Progress Meetings 8 Trip(s) @ 600 miles @ $0.700 $3,360.00
Pre-Paving Meeting 1 Trip(s) @ 600 miles @ $0.700 $420.00
Site Visits for construction Milestones 3 Trip(s) @ 600 miles @ $0.700 $1,260.00
Pre-Final Inspection 1 Trip(s) @ 600 miles @ $0.700 $420.00
Final Inspection 1 Trip(s) @ 600 miles @ $0.700 $420.00
*All Trips reflect Raleigh, NC office to CEU unless noted otherwise
B. Construction Administration $6,300.00
A. Construction Observation/ Resident Project Representative (RPR)
Full Time RPR for 100 Days, 15 weeks at 50 hr/week
Weekly Travel to/from the site 15 Trip(s) @ 250 miles @ $0.700 $2,625.00
Weekly Travel at the site 15 Trip(s) @ 50 miles @ $0.700 $525.00
Hotel(5 nights /week) 75 Nights of Lodging $150.00 $11,250.00
Per Diem 75 Days $68.00 $5,100.00
A. Construction Observation/ Resident Project Representative (RPR)$19,500.00
$26,640.00
Subconsultant Expenses
Construction Administration (Electrical) 35,645.00$
Quality Assurance Testing 59,748.60$
Erosion Control Inspections 12,393.00$
107,786.60$
I. BASIC SERVICES
DIRECT EXPENSES
SUBCONSULTANT EXPENSES TOTAL
DIRECT EXPENSES TOTAL
II. SPECIAL SERVICES
SUBCONSULTANT
EXPENSES
DATE PREPARED: 06-10-2025
ATTACHMENT 'B' - DIRECT EXPENSES
PROJECT DESCRIPTION: CEU Runway Pavement Rehab (Construction Phase)
PREPARED BY: Kristopher Erwin & Jason Kennedy / Ardurra Group, Inc.
WBS NUMBER:
`
Scope of Services
Oconee County Regional Airport
Taxiway Pavement Rehabilitation
Electrical Construction Admin
8226 Creedmoor Road, Suite 201, Raleigh, NC 27613 ● Phone 919.522.0628 ● www.we-engineering.com
Electrical Construction Administration Support
A. CONSTRUCTION ADMINISTRATION (CA) : Construction Administration services for
the project will be provided by the CONSULTANT. Construction Administration services
shall include the following:
• Complete Two (2) site visits with the OWNER to review construction. The site visit will
be a visual review of the construction activities.
• Attend bi-weekly construction progress meetings virtually throughout the duration of the
project (8 meetings anticipated).
• Review and respond (or take other appropriate action in respect of) shop drawings and
samples, the results of tests and inspections and other data which each Contractor is
required to submit (10 submittals anticipated).
• Review and respond to request for information from the Contractor (3 RFIs accounted
for).
• Recommend to WKD change orders and/or supplemental agreements to the construction
contract incidental to existing field conditions or improvements in the project design.
Prepare estimates of cost or savings from proposed order(s), prepare change order(s) along
with basis for recommendation and negotiate on behalf of OWNER with the Contractor
to arrive, if possible, at an appropriate compensation resulting from the proposed
revisions. In collaboration with WKD, coordinate Review of change orders and
Supplemental agreements with the SCDOT Airport Project Manager (APM) for
acceptance and concurrence regarding grant assurances and eligibility prior to execution
(2 Change Orders Accounted for).
• Attend Pre-final and final walk through at or near the end of the project as scheduled by
the Airport / WKD.
B. MISCELLANEOUS
1. All work not specifically stated in this scope of work is excluded. For clarity, a
list of exclusions is shown below:
a. Any permitting
b. Electrical Construction Inspection Services
c. Sub-Surface evaluation of electrical items
d. Electrical Testing
The above list is not all-inclusive.
C. DELIVERABLES
• Field reports during site visits during construction
`
Scope of Services
Oconee County Regional Airport
Taxiway Pavement Rehabilitation
Electrical Construction Admin
8226 Creedmoor Road, Suite 201, Raleigh, NC 27613 ● Phone 919.522.0628 ● www.we-engineering.com
• Reviewed electrical shop drawings
• Responded to RFIs
• Change Order documents, as required
• Electrical Punchlist
• Record drawings DWG Format and PDF format
D. PROJECT FEE
The total fee to perform the scope of services described herein is shown in the
attached man-hour / task break and will billed hourly not to exceed.
END OF S COPE OF SE RVICES
Oconee County Regional Airport
Taxiway Pavement Rehabilitation
Electrical Construction Admin
Electrical - REV(0) 4/30/2025
DESCRIPTION PROJECT MANAGER ENGINEER Design Engineer Admin Total Labor
Rate: $ 195 Rate: $ 175 Rate: $ 150 Rate: $ 105
MH COST MH COST MH COST MH COST MH COST
Construction Admin Support
Review and provide responses to electrical Request for Information (RFI’s) submitted by the
contractor (3 RFIs Accounted For) 1 $195.00 12 $2,100.00 8 $1,200.00 0 $0.00 $3,495.00
Review and process electrical shop drawing submittals (10 Submittals Anticipated) 1 $195.00 20 $3,500.00 8 $1,200.00 0 $0.00 $4,895.00
Conduct site visit/inspections on an as needed basis (2-site visits) 1 $195.00 16 $2,800.00 8 $1,200.00 0 $0.00 $4,195.00
Virtual Construction Progress Meetings (8 Meetings - Biweekly) 4 $780.00 12 $2,100.00 8 $1,200.00 0 $0.00 $4,080.00
Attended final inspection with Inspection Report 1 $195.00 12 $2,100.00 8 $1,200.00 0 $0.00 $3,495.00
Provide consultation to the OWNER, as needed, regarding electrical work items and facilitate
communication with the contractor. 1 $195.00 12 $2,100.00 0 $0.00 0 $0.00 $2,295.00
Prepare an inspection report and punch list for electrical work items. 1 $195.00 12 $2,100.00 0 $0.00 0 $0.00 $2,295.00
Attend the pre‐final inspection, if required. 0 $0.00 12 $2,100.00 0 $0.00 0 $0.00 $2,100.00
Make recommendations to the OWNER regarding contract change orders (2 Change Orders
Accounted For) 1 $195.00 12 $2,100.00 20 $3,000.00 0 $0.00 $5,295.00
Record Drawings 1 $195.00 6 $1,050.00 12 $1,800.00 0 $0.00 $3,045.00
12 $ 2,340 126 $ 22,050 72 $ 10,800 0 $ -
Direct Expenses
Printing $ - Total Labor $ 35,190.00
Travel - 2 trips (325 mi per trip at 70-cents per mile) $ 455.00 Direct Expenses $ 455.00
Direct Expenses Subtotal $ 455.00
Total $ 35,645.00
Walls Engineering,pllc
CLASSIFICATION RAW
RATE
BREAKEVEN
MULTIPLIERPROFITHOURLY
RATE
PROJECT MANAGER $70.32 2.521 10% $195.00
ENGINEER $63.11 2.521 10% $175.00
DESIGN ENGINEER $54.09 2.521 10% $150.00
ADMIN. $37.86 2.521 10% $105.00
S&ME, Inc. | 48 Brookfield Oaks Drive, Suite F | Greenville, SC 29607 | p 864.297.9944 | www.smeinc.com
March 19, 2025
WK Dickson & Co., Inc.
1350 Church Street Ext. NE, Suite 200
Marietta, Georgia 30060
Attention: Mr. Kris Erwin, P.E.
Reference: Proposal for Quality Assurance Testing
CEU – Taxiway A Pavement Rehabilitation
Oconee County Regional Airport (CEU)
Seneca, Oconee County, South Carolina
S&ME Proposal No. 25600215
Dear Mr. Erwin:
S&ME, Inc. appreciates the opportunity to submit this proposal to provide Quality Assurance Testing Services
(“QA”-level construction materials testing) for the referenced project. This proposal describes our understanding
of the project, discusses the intended scope of our services, and presents the estimated probable cost for our
services (based on established unit rates that will apply).
Project Information
Our understanding of the project is based on the following information:
• Email between Mr. Kris Erwin, P.E. with WK Dickson and Mr. Gant Taylor, P.E. with S&ME on March 15,
2025; and
• Issue for 100% Design Progress Set by WK Dickson, dated February 2025.
From our correspondence and review of the referenced material, we understand Oconee County Regional Airport
(CEU) is planning to rehabilitate the primary taxiway system. The components of the project will include pavement
rehabilitation of the parallel taxiway and associated connectors. The taxiway is approximately 4,800 feet in length,
primary connectors are roughly 240 feet long, and secondary connectors to aprons are 80 feet long. The project
primarily consists of asphalt paving (FAA P-401), P-209 stone base course placement (P-209), and some grading
work along the taxiway shoulders (P-152).
We understand this portion of work has around 100 calendar days for the Base Bid work.
Scope of Services
Based on the provided project documents, we anticipate the following services may be required. Following is a
general description of each of the services proposed. Testing will be performed in general accordance with the
applicable ASTM/FAA and/or industry standards, unless noted otherwise. We will coordinate our site visits for
testing with the RPR, Contractor, and the Contractor’s QC firm.
Proposal for Quality Assurance Testing
CEU – Taxiway A Pavement Rehabilitation
Oconee County Regional Airport
Seneca, Oconee County, South Carolina
S&ME Proposal No. 25600215
March 19, 2025 2
Excavation, Subgrade, and Embankment [P-152]
Our services related to the excavation, subgrade, and embankment can include the following:
• Perform density testing in accordance with ASTM D 1557 and/or ASTM D6938;
• Perform modified Proctor (ASTM D1557) laboratory testing per each soil type based on visual
classification; and
• Observe proofrolling operations of the soil subgrade as required by the project specifications.
Please note, S&ME will not be responsible for surveying the Embankment for grade acceptance.
Crushed Aggregate Base Course [P-209]
Our services related to the crushed aggregate base course can include the following:
• Observe and review the contractor’s thickness measurements;
• Perform laboratory testing in accordance with ASTM D1557 and ASTM C136; and
• Perform density testing in accordance with ASTM D 1556 and/or ASTM D6938.
Asphalt Mix Pavement [P-401]
Our services related to the asphalt pavement courses can include the following:
• Quality Assurance Observations and Testing of Asphalt Pavements: We have assumed the following
services will be needed during asphalt placement:
• Our personnel can be present at the contractor’s asphalt laboratory during production of the P -401
HMA products. We can observe as the contractor runs the required tests during each day’s
production and perform the specified sampling and testing procedures for quality assurance.
• Our personnel can be present at the taxiway during asphalt placement to observe ambient air
temperature, asphalt temperature, lift thickness, and compaction effort of the asphalt.
• Control Strip: We have assumed that the control strip will be performed by the contractor several days
prior to production and that our personnel will be present at the plant and at the placement location to
perform specified sampling and testing.
Erosion Control Monitoring Services
S&ME will perform stormwater control inspection work in accordance with the requirements of SCDHEC NPDES
General Permit for Stormwater Discharges From Construction Activities (Permit No. SCR100000) issued January 29,
2021. It should be noted that this proposal only covers the inspection requirements of the permit which are found in
Section 4.20 of this Permit and specifically excludes other requirements of the permit. S&ME will perform an
inspection at least once every calendar week of erosion control measures on the project site as indicated on the
Stormwater Pollution Plan (SWPPP) and within 24 hours of the end of a storm event of 0.5 inches or greater, as
recommended by SCDHEC. S&ME should be scheduled by the contractor of a qualifying rain event in excess of
0.50 inches. Our field reports will be available for review in a binder on site. A representative of the General
Proposal for Quality Assurance Testing
CEU – Taxiway A Pavement Rehabilitation
Oconee County Regional Airport
Seneca, Oconee County, South Carolina
S&ME Proposal No. 25600215
March 19, 2025 3
Contractor will be informed of deficiencies noted during the inspections. Our inspections will continue until final
stabilization is achieved on pertinent areas of the project site. For each inspection we will complete an inspection
report. At a minimum, the inspection report will include:
The inspection date;
Names, titles, and, if not previously given in an inspection report, the qualifications of personnel
making the inspection, unless those qualifications change;
Weather information for the period since the last inspection (or since commencement of construction
activity if the first inspection) including a reasonable estimate of the beginning of each storm event,
duration of each storm event, approximate amount of rainfall for each storm event (in inches), and
knowledge of discharge occurrence;
Weather information and a description of any discharges occurring at the time of the inspection;
Location(s) of discharges of sediment or other debris from the site;
Location(s) of Best Management Practices (BMPs) that need maintenance;
Location(s) of BMPs that failed to operate as designed or are inadequate for a particular location;
Location(s) where additional BMPs are needed that did not exist at the time of inspection;
Corrective action required including any changes to the SWPPP necessary and implementation dates;
Site Name, Operator Name, and permit number; and
Assessment that all BMP’s and stormwater controls identified in the OS-SWPPP have been installed
and are operating as designed.
Site Meeting Attendance
• Pre-Paving Meeting: We understand that a pre-paving meeting will be held and that S&ME will be
requested to attend this meeting.
• Progress Meetings: We understand that S&ME will be requested to attend periodic progress meetings
(expected to be bi-monthly, with possible virtual attendance).
• Punchlist Meetings: We understand that S&ME will be requested to attend punchlist walkthroughs on-
site (two meetings are expected).
• Geotechnical Review: We will review and advise on Geotechnical related shop drawings and RFIs.
This scope of services should be reviewed by the Design Professional in Charge to confirm that it meets their
requirements. If additional services beyond those described in this proposal are required, we can prepare an
addendum to this proposal describing those services.
REPORTING
Field reports will be prepared by our technicians and draft copies can be provided to the on -site representative
daily if requested. Our report formats follow the general requirements of the applicable ASTM standard. Formal
reports summarizing our test results will be distributed according to a project distribution list directed by the
client after our Project Manager has reviewed them.
Proposal for Quality Assurance Testing
CEU – Taxiway A Pavement Rehabilitation
Oconee County Regional Airport
Seneca, Oconee County, South Carolina
S&ME Proposal No. 25600215
March 19, 2025 4
EXCLUDED SERVICES
Without attempting to provide a complete list of all services or potential services that will be excluded from this
proposal and not performed by S&ME, the following services are specifically excluded from this proposal. Some
of these services can be performed by S&ME if desired; however, a separate or revised proposal for these services
would be required.
• Directing of any contractor’s or subcontractor’s work.
• Any aspect of site safety other than safety of S&ME employees.
• Environmental Services.
• Quality Control Testing (provided by Contractor).
CLIENT RESPONSIBILITIES
We ask that you be responsible for the following:
1. Scheduling: Provide us with the name of the individual who will be responsible for scheduling and
directing our testing services. Provide, or instruct your appointed representative to provide, a minimum
24-hour notice for our services.
When our services will be needed on weekends and/or holidays (Memorial Day, July 4 th, Labor Day,
Thanksgiving Day, the day after Thanksgiving, Christmas Eve, Christmas Day, and New Year's Day), we
require a minimum 48-hour notification.
2. Report Distribution: Provide us with all applicable names and addresses for report distribution.
SCHEDULE
We anticipate that our services will be performed on both a full-time and part-time on-call basis for the
operations outline above. Scheduling should be made through the S&ME project manager assigned to this
project who will assign the appropriate, qualified personnel to perform the requested work.
For our correspondence with Mr. Erwin, we understand construction is scheduled to begin in late August / early
September 2025, with a 100 calendar day duration. The construction will be performed during daytime hours and
be performed in two phases. For estimation of erosion control inspections, we will perform them on a weekly
basis and after each ½ inch rainfall event, estimated at one additional trip per two weeks throughout the
construction process, which is an assumed 20-week time period, for a total of 30 inspections.
We request that a minimum one-week notification be provided whenever our initial services are needed so that
we may coordinate our field personnel to meet your specific needs. We request at least a one -day notice when
part-time, on call work is needed. If our services will be needed during off-hours (between 7:00 pm and 7:00 am)
and/or on holidays (Memorial Day, 4th of July, Labor Day, Thanksgiving Day, the day after Thanksgiving, Christmas
Eve, Christmas Day, and New Year's Day), we require a minimum 48-hour notification.
Proposal for Quality Assurance Testing
CEU – Taxiway A Pavement Rehabilitation
Oconee County Regional Airport
Seneca, Oconee County, South Carolina
S&ME Proposal No. 25600215
March 19, 2025 5
S&ME will not be responsible for any damages caused by construction delays that are related to inadequate
notice, improper scheduling, or for work performed by the Contractor without our presence.
COMPENSATION
Based on the scope of services we have outlined above, we have developed a fee estimate. Time schedules used
to develop this fee estimate were based on the provided information. We estimate a budget allowance on the
order of $72,141.60 will be required.
We have enclosed a Fee Schedule that would be appropriate for the proposed services. Units used will be billed
in accordance with our Fee Schedule provided. The estimated units used for the proposed budget are outlined on
the attached Estimate of Probable Cost. The budget allowance is approximate and may vary depending on final
construction schedules, which may be affected by weather and/or scheduling by the contractor. In addition, any
re-testing required as a result of non-compliance items, inadequate scheduling, or testing not outlined in this
proposal, including those from design changes, will affect this cost estimate.
AUTHORIZATION
Our Agreement for Services, Form Number AS-071, is attached and is incorporated as a part of this proposal.
Please indicate your acceptance of our proposal by signing the form and returning it to our office. We will then
proceed with the performance of services. If you elect to accept our proposal by issuing a purchase order, then
please reference this proposal number and date. Your purchase order will be an acceptance of our Agreement of
Services and an authorization to proceed with the performance of our services. The terms and conditions
included in any purchase order shall not apply, as our agreement is for services that are not compatible with
purchase order agreements.
This proposal was sent to you via email. If you elect to accept our proposal by return email, then please reference
this proposal number and date. Your email acceptance will serve as representation to S&ME that you have
reviewed the proposal and associated Agreement for Services (AS-071) and hereby accept both as written.
This proposal is solely intended for the Basic Services as described in the Scope of Services. The Scope of Services
may not be modified or amended, unless the changes are first agreed to in writing by the Client and S&ME. Use
of this proposal and resulting documents is limited to above-referenced project and client. No other use is
authorized by S&ME, Inc.
Proposal for Quality Assurance Testing
CEU – Taxiway A Pavement Rehabilitation
Oconee County Regional Airport
Seneca, Oconee County, South Carolina
S&ME Proposal No. 25600215
March 19, 2025 6
CLOSING
We appreciate the opportunity to provide this proposal to you. If you have any questions regarding the services
we have outlined above, please do not hesitate to contact us at (864) 297-9944.
Sincerely,
S&ME, Inc.
Kyle D. Anderson, P.E. Gant M. Taylor, P.E.
Project Manager Senior Engineer
Attachments: Fee Schedule
Estimate of Probable Cost
Agreement for Services Form (AS-071)
1 Associate Staff Professional, regular time, per hour…………………………………………………………………………………………………………………….$95.00
2 Staff Professional, regular time, per hour…………………………………………………………………………………………………………………….$135.00
3 Project Manager, regular time, per hour…...................................................................... $155.00
4 Senior Engineer, regular time, per hour…………………………………………………………………………………………………………………….$185.00
5 Principal Engineer, regular time, per hour…………………………………………………………………………………………………………………….$210.00
6 Field Services Coordinator, regular time, per hour….............................................................. $135.00
7 Secretarial Services, regular time, per hour…………………………………………………………………………………………………………………….$75.00
8 Erosion Control Inspector, per hour….............................................................................. $85.00
TECHNICIAN SERVICES
1 Special Inspector / Engineering Technician….................................................................. $70.00
2 Senior Special Inspector / Engineering Technician….................................................................................................$70.00
3 Metals Technician / Special Inspector (Wood, Steel) regular time, per hour…………………………………………………………………………………………………………………….$105.00
1 Standard Proctor Compaction Test (ASTM D698), each…………………………………………………………………………………………………………………………..$195.00
2 Modified Proctor Compaction Test (ASTM D1557), each…………………………………………………………………………………………………………………………..$225.00
3 ABC Stone Proctor Compaction Test, each………………………………………………………………………………………………………………$225.00
4 ABC Stone Gradation, each…………………………………………………………………………………………………………………………….$175.00
5 Grain Size Tests (Wash 200 Sieve), each……………………………………………………………………………………………………………………………..$95.00
6 Grain Size Tests (With Hydrometer), each……………………………………………………………………………………………………………………………$175.00
7 Atterberg Limits Test, each……………………………………………………………………………………………………………………………………………………..$95.00
8 Natural Moisture Content Test, each……………………………………………………………………………………………………………………………………$20.00
9 Triaxial Compression Test (remolded, consolidated undrained), each……………………………………………………………………………………………….$1,200.00
10 Direct Shear Test, each………………………………………………………………………………………………. $500.00
11 Compressive Strength of concrete cylinders*, each……………………………………………………………………………………………….$20.00
12 Compressive Strength of Grout Prisms (ASTM C1019), each……………………………………………………………………………………………………………………………..$20.00
13 Compressive Strength of 2" mortar cube samples (ASTM C109), each……………………………………………………………………………………………………………………………..$20.00
14 Specific Gravity/Density of Asphalt Cores, each……………………………………………………………………………………………….$50.00
15 Coring Truck, per day…................................................................................................................ $300.00
1 Equipment/Vehicle Charge, per trip……………………………………………………………………………………………………………………………………………………….$50.00
2 Mileage….................................................................................................................... $0.85
Note:
A. Overtime rates will be 1.5 times the regular rate indicated for labor for technician services
B. Overtime includes all time in excess of 8 hours per day, Saturdays, Sundays & Holidays
2025 S&ME UNIT RATE FEE SCHEDULE
CONSTRUCTION TESTING SERVICES
Greenville / Spartanburg, SC
PROFESSIONAL SERVICES
MATERIAL TESTING SERVICES
MISCELLANEOUS EQUIPMENT
A. Engineering Technician: Assume 4 weeks at 20 hours a week for compaction testing and proofrolling during
P-152 and P-209 activities. (10 visits)
1. Regular Time 80 hours at $70.00 /hr --------------- $5,600.00
C. Modified Stone Base Compaction Test 1 each at $275.00 /each --------------- $275.00
D. Equipment Charge 10 days at $50.00 /day --------------- $500.00
E. Mileage (86 miles R.T.) 860 miles at $0.85 /miles --------------- $731.00
SUBTOTAL $7,106.00
II. Asphalt Mix Pavement [P-401] Testing Services
A. Engineering Technician: Assume full time for 6 weeks at 5 visits per week at 10 hours to observe asphalt paving
services in the field and assume additional 30 visits at 6 hours a day to observe the laboratory test in the
contractor's asphalt plant. (50 visits)
1. Regular Time 420 hours at $70.00 /hr --------------- $29,400.00
2 Overtime 60 hours at $105.00 /hr --------------- $6,300.00
B. Project Engineer: Assume a site visit during construction of the control strip at 6 hours to observe asphalt. paving
(1 visit)
1. Regular Time 6 hours at $155.00 /hr --------------- $930.00
C. Equipment Charge 20 day at $50.00 /each --------------- $1,000.00
D. Mileage (86 miles R.T.) 3526 miles at $0.85 /miles --------------- $2,997.10
SUBTOTAL $40,627.10
III. Erosion Control Monitoring Services
A. Erosion Control Inspector: Assume 20 weeks of weekly inspections and 10 additional trips for rain events over
1/2-inch at 4 hours a visit. (24 visits)
1. Regular Time 120 hours at $85.00 /hr --------------- $10,200.00
B. Mileage (86 miles R.T.) 2580 miles at $0.85 /miles --------------- $2,193.00
SUBTOTAL $12,393.00
IV. Project Meetings, Project Management, Administration, and Reporting
A. Project Manager 50 hours $155.00 /hr --------------- $7,750.00
B. Administrative Support 15 hours $75.00 /hr --------------- $1,125.00
C. Senior Engineer 15 hours $185.00 /hr --------------- $2,775.00
D. Mileage (86 miles R.T.) 430 miles at $0.85 /miles --------------- $365.50
SUBTOTAL $12,015.50
Total Budget Estimate $72,141.60
Estimate of Probable Cost
CEU - Taxiway Pavement Rehabilitation
Oconee County Regional Airport / Seneca, South Carolina
S&ME Proposal No. 25600215
I. Excavation, Subgrade, and Embankment [P-152] and Crushed Aggregate Base Course [P-209] Testing Services
2025-13
STATE OF SOUTH CAROLINA
COUNTY OF OCONEE
ORDINANCE 2025-13
AN ORDINANCE AMENDING CHAPTER 20 (LAW
ENFORCEMENT) OF THE OCONEE COUNTY CODE OF
ORDINANCES BY ADDING ARTICLE V, ENTITLED
“PROHIBITED OR RESTRICTED CONDUCT – SOLICITATION,
OBSTRUCTION OF PUBLIC STREETS, UNAUTHORIZED
CAMPING,” IN ORDER TO ADDRESS CERTAIN HAZARDS
AND PUBLIC H ARM RELATED THERETO; AND OTHER
RELATED MATTERS.
WHEREAS, consistent with the powers granted county governments by S.C. Code § 4-9-
25 and S.C. Code § 4-9-30, Oconee County (“County”), a body politic and corporate and a political
subdivision of the State of South Carolina, acting by and through its governing body, the Oconee
County Council (“County Council”), has the authority to enact regulations, resolutions, and
ordinances, not inconsistent with the Constitution and the general law of the State of South
Carolina, including the exercise of such powers in relation to health and order within its boundaries
and respecting any subject as appears to it necessary and proper for the security, general welfare,
and convenience of the County or for preserving health, peace, order, and good government
therein;
WHEREAS, the County has adopted multiple ordinances for the effective, efficient
governance of the County, which, subsequent to adoption, are codified in the Oconee County Code
of Ordinances (“Code of Ordinances”), as amended; and
WHEREAS, County Council recognizes that there is a need to revise the law of the County
to meet the changing needs of the County, and that there is a need to amend, specifically, Article
20 (Law Enforcement) of the Code of Ordinances by adding Article V, entitled “Prohibited or
Restricted Conduct – Solicitation, Obstruction of Public Streets, Unauthorized Camping,” in order
to address certain hazards and public harm related thereto , and to affirm and preserve all other
provisions of the Code of Ordinances not specifically or by implication amended thereby.
NOW, THEREFORE, it is hereby ordained by the Oconee County Council, in meeting
duly assembled, that:
1. Chapter 20 (Law Enforcement) of the Oconee County Code of Ordinances is hereby
amended by the addition of Article V, entitled “ Prohibited or Restricted Conduct – Solicitation,
Obstruction of Public Streets, Unauthorized Camping” as set forth in Exhibit A, attached hereto
and incorporated herein by reference.
2. Should any part or provision of this Ordinance be deemed unconstitutional or
unenforceable by a court of competent jurisdiction, such determination shall not affect the rest and
remainder of this Ordinance, all of which is hereby deemed separable.
2025-13
3. All ordinances, orders, resolutions, and actions of County Council inconsistent
herewith are, to the extent of such inconsistency only, hereby repealed, revoked, and rescinded.
4. All other terms, provisions, and parts of the Code of Ordinances not amended
hereby, directly or by implication, shall remain in full force.
5. This Ordinance shall take effect and be in full force from and after third reading
and enactment by County Council.
ORDAINED in meeting, duly assembled, this ____ of ________________, 2025.
ATTEST:
Jennifer C. Adams Matthew Durham
Clerk to Oconee County Council Chair, Oconee County Council
First Reading: July 15, 2025
Second Reading: August 19, 2025
Third Reading: September 02, 2025
Public Hearing: September 02, 2025
EXHIBIT A
ARTICLE V. - PROHIBITED OR RESTRICTED CONDUCT – SOLICITATION,
OBSTRUCTION OF PUBLIC STREETS, UNAUTHORIZED CAMPING.
1. APPLICATION.
This chapter applies to all unincorporated areas of the Oconee County, and to any other
areas under its jurisdiction by intergovernmental agreement, operation of law, or otherwise.
2. DEFINITIONS.
For the purpose of this chapter, the following definitions shall apply unless the context
clearly indicates or requires a different meaning.
a. Aggressive Manner shall mean any of the following:
i. Before, during or after soliciting, approaching or speaking to a person, or following
a person, if that conduct is intended or is likely to cause reasonable persons to fear
bodily harm to themselves or to another, or damage to or loss of property, or to
otherwise be intimidated into giving money or any other thing of value;
ii. In the course of soliciting, intentionally touching or causing physical contact with
another person or an occupied vehicle without that person's consent;
iii. Intentionally blocking or interfering with the safe or free passage of a pedestrian or
vehicle by any means, including unreasonably causing a pedestrian or vehicle
operator to take evasive action to avoid physical contact with the solicitor;
iv. Before, during or after soliciting, using violent or threatening gestures toward a
person;
v. Persisting in closely following or approaching a person, after the person has
informed the solicitor by words or conduct that such person does not want to be
solicited or does not want to give money or any other thing of value to the solicitor;
or
vi. Before, during or after the solicitation, using profane, offensive or abusive language
which is likely to cause the person solicited to be threatened by such language.
b. Right-of-Way or Rights -of-Way. A public road over which a person or entity has the
legal right to access.
c. Soliciting or Solicitation . To approach someone with a request or plea for funds or
items of value, whether in exchange for something of value or not.
d. Solicitor. A person who engages in soliciting.
e. Special Event. A pre-planned activity sponsored by an individual, group, organization
or entity, to be held on public property, including public streets, sidewalks, trails,
facilities, parks or other property owned or managed by the county, which event would
significantly impact either public property and/or normal vehicular and pedestrian
traffic or require the use of county services, and which shall include but not be limited
to a p arade, foot race, bike or wheeled race, celebration, amusement event, cultural
recognition, sporting event, demonstration, competition, commercial movie or
television production, photography shoot, commercial for -profit event, charitable
cause, or other similar activity.
3. SOLICITING.
a. The provisions of this section do not apply to a permitted special event.
b. Obstructing public ways and means of ingress to and egress from private property.
i. Solicitors shall not obstruct or otherwise inhibit the free, safe, and efficient flow of
vehicular or pedestrian traffic on any public sidewalks, streets, rights -of-way, or
other public property.
ii. Solicitors shall not obstruct or otherwise inhibit the free, safe, and efficient flow of
vehicular or pedestrian traffic into and out of private property adjacent to any public
right-of-way.
c. Soliciting during certain hours prohibited. No person shall engage in soliciting between
sunset and sunrise.
d. Approaching vehicular traffic prohibited. Under no circumstances shall a person
soliciting approach any moving vehicle or step into the roadway to approach a vehicle
stopped at an intersection.
e. Soliciting unlawful on private property. It shall be unlawful to engage in soliciting on
any property where a sign is posted that states “No Trespassing,” “No Peddlers,” “No
Solicitors, “No Buskers,” or words of similar import.
f. Blocking rights-of-way.
i. Solicitors shall position themselves so that they, and any crowd that they may draw,
will not:
1. Block roadways, fire apparatus access roads, sidewalks, crosswalks, driveways,
doors, stairways, curb cuts, or handicapped access ramps;
2. Block access to buildings, parks, conveyances, businesses, or traffic control
poles containing a pedestrian crosswalk button(s);
3. Be within three feet of a utility apparatus or appurtenance; or
4. Be within twenty ( 20) feet of a fire hydrant, fire department connection, fire
alarm or other emergency communication device. At a minimum, there shall be
at least a five-foot passageway on the sidewalk.
ii. If a solicitor shall attract a crowd sufficient to violate this section , then a law
enforcement officer shall have authority to disperse that portion of the crowd that
is in violation.
iii. Personal property used for soliciting shall not be left unattended on any public right-
of-way or other publicly-owned place.
iv. Noise. The conduct and behavior of all solicitors shall otherwise comply in all
respects with existing noise ordinances at all times.
v. Littering. Solicitors shall remove all trash and debris that has been generated during
the time of their solicitation.
vi. Aggressive solicitation prohibited. No person shall solicit in an aggressive manner
on a public right-of-way, sidewalk, or other publicly-owned property.
g. Prohibited areas for solicitors. There shall be no soliciting within fifty (50) feet of the
perimeter of a(n):
i. Automatic teller machine (ATM);
ii. Church grounds, while in session;
iii. School grounds, while in session;
iv. Library;
v. Hospital;
vi. Funeral home;
vii. Bank or other financial institution;
viii. Hotel, motel, or other lodging accommodations generally open to the public;
ix. Outdoor dining or merchandise area;
x. Entrance or exit of a performance venue;
xi. Special event;
xii. Food or merchant "drive-through" area;
xiii. Transit stop;
xiv. Parking lot;
xv. Daycare; or
xvi. Construction areas. During times of construction work on the streets, sidewalks or
other public infrastructure, the county may from time to time temporarily prohibit
solicitors from the area near such construction work.
4. PROHIBITED BEHAVIOR ON PUBLIC OR PRIVATE PROPERTY.
a. Obstructing streets. Any person who remains standing, lying, or sitting down on any
public sidewalk, street, alley, or other public property in such a manner as to obstruct
or impede the free passage of pedestrians or public travel, after being requested to
immediately move by a law enforcement officer, shall be found in violation of this
section (obstructing streets).
b. Disorderly conduct – Unauthorized camping; damaging county property.
i. Any person who shall occupy, lodge, or sleep in any building, structure, or place,
whether public or private, or in any motor vehicle, without the written permission of
the owner or person entitled to possession or in control thereof, shall be found in
violation of this section (disorderly conduct).
ii. Camping on public property.
1. It shall be unlawful for any person, except as may be specifically authorized by
the appropriate governmental authority, to use any of the streets, sidewalks,
parks, or playgrounds, or any other public property for the purpose of camping
at any time; or to cause or permit any vehicle to remain in any of said places to
the detriment of public travel or convenience.
2. It shall be unlawful for any person, except as may be specifically authorized by
the appropriate governmental authority, to light or use a campfire or a bonfire
on public property.
3. It shall be unlawful for any person, except as may be specifically authorized by
appropriate governmental authority, to hang, fasten, or attach any rope, wire,
chain, or electrical device or power cord to any public property, including
buildings, bridges, overpasses, or utility poles.
iii. Damaging county property. It is unlawful for any person, except as may be
specifically authorized by appropriate governmental authority, to willfully or
negligently to cut, mutilate, deface or otherwise injure any building, tree, shrub,
lamppost, fence, bridge, hydrant, cart, vehicle, or other real or personal property
belonging to or under the control of the county, or used for any public purpose.
5. PENALTY.
Any person who violates any provision of this ordinance may be fined not more than $500,
imprisoned for not more than 30 days, or both.
2025-14
STATE OF SOUTH CAROLINA
COUNTY OF OCONEE
ORDINANCE 2025-14
AN ORDINANCE AMENDING CHAPTER 20 (LAW
ENFORCEMENT) OF THE OCONEE COUNTY CODE OF
ORDINANCES BY ADDING ARTICLE VI , ENTITLED
“PUBLIC NUISANCES ,” IN ORDER TO ADDRESS CERTAIN
HAZARDS AND PUBLIC H ARM RELATED THERETO; AND
OTHER RELATED MATTERS.
WHEREAS, consistent with the powers granted county governments by S.C. Code § 4-9-
25 and S.C. Code § 4-9-30, Oconee County (“County”), a body politic and corporate and a political
subdivision of the State of South Carolina, acting by and through its governing body, the Oconee
County Council (“County Council”), has the authority to enact regulations, resolutions, and
ordinances, not inconsistent with the Constit ution and the general law of the State of South
Carolina, including the exercise of such powers in relation to health and order within its boundaries
and respecting any subject as appears to it necessary and proper for the security, general welfare,
and co nvenience of the County or for preserving health, peace, order, and good government
therein;
WHEREAS, the County has adopted multiple ordinances for the effective, efficient
governance of the County, which, subsequent to adoption, are codified in the Oconee County Code
of Ordinances (“Code of Ordinances”), as amended; and
WHEREAS, County Council recognizes that there is a need to revise the law of the County
to meet the changing needs of the County, and that there is a need to amend, specifically , Article
20 (Law Enforcement) of the Code of Ordinances by adding Article V I, entitled “P ublic
Nuisances,” in order to address certain hazards and public harm related thereto, and to affirm and
preserve all other provisions of the Code of Ordinances not specifically or by implication amended
thereby.
NOW, THEREFORE, it is hereby ordained by the Oconee County Council, in meeting
duly assembled, that:
1. Chapter 20 (Law Enforcement) of the Oconee County Code of Ordinances is hereby
amended by the addition of Article V I, entitled “Public Nuisances ” as set forth in Exhibit A,
attached hereto and incorporated herein by reference.
2. Should any part or provision of this Ordinance be deem ed unconstitutional or
unenforceable by a court of competent jurisdiction, such determination shall not affect the rest and
remainder of this Ordinance, all of which is hereby deemed separable.
3. All ordinances, orders, resolutions, and actions of County Council inconsistent
herewith are, to the extent of such inconsistency only, hereby repealed, revoked, and rescinded.
2025-14
4. All other terms, provisions, and parts of the Code of Ordinances not amended
hereby, directly or by implication, shall remain in full force.
5. This Ordinance shall take effect and be in full force from and after third reading
and enactment by County Council.
ORDAINED in meeting, duly assembled, this ____ of ________________, 2025.
ATTEST:
Jennifer C. Adams Matthew Durham
Clerk to Oconee County Council Chair, Oconee County Council
First Reading: July 15, 2025
Second Reading: August 19, 2025
Third Reading: September 02, 2025
Public Hearing: September 02, 2025
EXHIBIT A
ARTICLE VI. - PUBLIC NUISANCES.
1. DEFINITIONS.
a. Business means any commercial establishment, use, property or structure used in, or part
of, a business or commercial use or establishment. Business does not include purely
residential property.
b. Continuous breach of the peace means a pattern of repeated acts or conduct which either
(1) directly disturbs the public peace or (2) disturbs the public peace by inciting or
tending to incite violence.
c. Public nuisance means conduct, conditions, events, circumstances, or the unreasonable
interference or the causing of unreasonable interference with rights of the public,
wherever occurring, including, but not limited to, a business or commercial
establishment, a public place, or where the public congregates or is invited or permitted
to congregate.
Public nuisance includes those conditions or circumstances constituting a nuisance as
set forth in S.C. Code § 15-43-10, specifically, the construction, establishment, continuance,
maintenance, use, ownership, occupation, the leasing or releasing of any property, building
or other place used for the purposes of lewdness, assignation, prostitution, human
trafficking, repeated acts of unlawful possession or sale of controlled substances, or
continuous breach of the peace.
Public nuisance also includes and is founded upon the sound principle set forth in South
Carolina case law that "if one maintains a place where the laws are publicly, repeatedly,
persistently, and intentionally violated, then such place would become a common or public
nuisance." State v. Turner, 198 S.C. 499, 505, 18 S.E.2d 376, 378 (1942).
2. NUISANCES OFFENDING PUBLIC DECENCY, PEACE AND ORDER . The following
are hereby declared to be public nuisances affecting public decency, peace and order,
whether such violations are of an intermittent, cyclical, continual, reoccurring or constant
nature; and including when the responsible party generates, enables, or contributes to the
occurrence of the unlawful behavior by an absence or failure of property management policy
or practice, absence or failure of control over the property, absence or failure of supervision
of guests or invitees, or clients, customers, patrons, or any other person providing some form
of c ompensation for some type of product or service, or absence or failure of security
measures:
a. Any business where gambling devices, slot machines, punch boards and other such
contrivances of similar character involving any elements of chance as a consideration or
any type of gambling, bookmaking, wagering or betting is carried on, and all gambling
equipment, except where such specific form of gambling is permitted by law;
b. Any business operated as a bawdy house, house of assignation, place of prostitution or
used and maintained for the commercial or criminal purposes of unlawful sexual activity
or human trafficking in violation of federal or state law or local ordinances;
c. Any business where alcohol or intoxicating liquors are manufactured, sold, bartered or
given away in violation of federal or state law or local ordinances, or where alcohol or
intoxicating liquors are kept for sale, barter or distribution in violation of federal or state
law or local ordinances, and all alcohol, liquors, bottles, kegs, pumps, bars and other
property kept at and used for maintaining such a place; or where required fire marshal
or other safety plans are not in place, or where persistent violations of law occur under
a failed or ineffective fire marshal or other safety plan;
d. Any business where acts of sale, manufacture, possession or distribution of controlled
substances occur in violation of federal or state law or local ordinances;
e. Any business where violations against federal or state law or local ordinances occur with
such frequency or intensity that they require an excessive public safety response cost.
"Excessive public safety response" means:
i. The recurring deployment of law enforcement officers, peace or code enforcement
officers commissioned pursuant to S.C. Code § 4-9-145, fire marshals or emergency
services personnel to an emergency scene at a business as a result of an unlawful act
which results in or could result in great bodily injury or death, or the recurring need
for public safety or county code enforcement personnel or emergency vehicles at a
business when compared to the frequency or intensity of law or regulation
enforcement required at other similarly situated businesses; or
ii. There have been six (6) or more law or peace officer enforcement dispatches,
incident reports, citations, or search warrants executed, or a combination thereof, at
a business for any of the following during the preceding twelve (12) months:
1. Violation of any federal, state, or local alcohol law;
2. Violation of any federal, state, or local narcotics law;
3. Violation of any federal, state, or local gun law;
4. Assaults;
5. Crimes of violence against another person(s); or
6. Crimes against property.
3. CRIMINAL ENFORCEMENT. PENALTIES.
A person who erects, establishes, continues, maintains, uses, owns, occupies, leases, or
releases, or serves as lessor or lessee of any building in such a way as to create a public nuisance
shall be guilty of a misdemeanor and shall be subject to a fine not exceeding five hundred dollars
($500.00) and imprisonment not exceeding thirty (30) days. Court costs are not included in any
fine imposed by the court.
Each day any violation of this ordinance continues shall constitute a separate offense.
The Oconee County Sheriff’s Office shall enforce this ordinance with the consultation and
concurrence of the County Administrator (“Administrator”). The Oconee County Sheriff
(“Sheriff”) and the Administrator, acting jointly, may declare a business in violation of this
ordinance a public nuisance, and the Sheriff or any Deputy Sheriff may enforce the provisions of
this ordinance upon the declaration of a public nuisance as provided for herein by uniform traffic
ticket, or warrant or by any other lawful process.
4. REMEDIES NOT EXCLUSIVE. The provisions of this ordinance are in addition to, and
not in lieu of, any other enforcement provision or process permitted by law. Nothing in this
ordinance supplants, alters, or limits a statutory or common law right of a person to bring
an action in court or the right of Oconee County to prosecute a person for the establishment
of a nuisance.
2025-15
STATE OF SOUTH CAROLINA
COUNTY OF OCONEE
ORDINANCE 2025-15
AN ORDINANCE AMENDING CHAPTER 10 (EMERGENCY
MANAGEMENT AND SERVICES) OF THE OCONEE COUNTY
CODE OF ORDINANCES BY REVISING THE PROVISIONS OF
ARTICLE II.A., ENTITLED “RESCUE SQUAD ADVISORY
COMMISSION”; AND OTHER RELATED MATTERS.
WHEREAS, consistent with the powers granted county governments by S.C. Code § 4-9-
25 and S.C. Code § 4-9-30, Oconee County (“County”), a body politic and corporate and a political
subdivision of the State of South Carolina, acting by and through its governing body, the Oconee
County Council (“County Council”), has the authority to enact regulations, resolutions, and
ordinances, not inconsistent with the Constitution and the general law of the S tate of South
Carolina, including the exercise of such powers in relation to health and order within its boundaries
and respecting any subject as appears to it necessary and proper for the security, general welfare,
and convenience of the County or for pre serving health, peace, order, and good government
therein;
WHEREAS, the County has adopted multiple ordinances for the effective, efficient
governance of the County, which, subsequent to adoption, are codified in the Oconee County Code
of Ordinances (“Code of Ordinances”), as amended; and
WHEREAS, County Council recognizes that there is a need to revise the law of the County
to meet the changing needs of the County, and that there is a need to amend, specifically, Chapter
10 (Emergency Management and Services) of the Oconee County Code of Ordinances by revising
the provisions of Article II.A. “Rescue Squad Advisory Commission” in order to reorganize the
Rescue Squad Advisory Commission, its responsibilities and reporting procedures; and to affirm
and preserve all other provisions of the Code of Ordinances not specifically or by implication
amended thereby.
NOW, THEREFORE, it is hereby ordained by the Oconee County Council, in meeting
duly assembled, that:
1. Article II.A. “Rescue Squad Advisory Commission” of C hapter 10 ( Emergency
Management and Services) of the Oconee County Code of Ordinances is hereby revised, amended,
and restated as set forth in Exhibit A, attached hereto and incorporated herein by reference.
2. Should any part or provision of this Ordinance be deemed unconstitutional or
unenforceable by a court of competent jurisdiction, such determination shall not affect the rest and
remainder of this Ordinance, all of which is hereby deemed separable.
3. All ordinances, orders, resolutions, and actions of County Council inconsistent
herewith are, to the extent of such inconsistency only, hereby repealed, revoked, and rescinded.
2025-15
4. All other terms, provisions, and parts of the Code of Ordinances not amended
hereby, directly or by implication, shall remain in full force.
5. This Ordinance shall take effect and be in full force from and after third reading
and enactment by County Council.
ORDAINED in meeting, duly assembled, this ____ of ________________, 2025.
ATTEST:
Jennifer C. Adams Matthew Durham
Clerk to Oconee County Council Chair, Oconee County Council
First Reading: August 18, 2025
Second Reading: September 02, 2025
Third Reading: September 16, 2025
Public Hearing: September 16, 2025
ARTICLE II. A. RESCUE SQUAD ADVISORY COMMISSION
Sec. 10-31. - Purpose of article.
The purpose of this article is to restructure the Oconee County Rescue Squad Advisory Commission, whose
mission is to provide a body of active members of the Oconee County rescue service to be responsible for guidance,
advice, and recommendations to the Oconee County Council (“County Council” or “Council”) on current and
future rescue squad activities and needs in Oconee County (“County”).
Sec. 10-32. – Reorganization of the Oconee County Rescue Squad Advisory Commission.
The County Council hereby reorganizes the Oconee County Rescue Squad Advisory Commission (the
“Rescue Commission” or “Commission”) as follows:
(a) Membership. The Rescue Commission shall consist of seven members, all of which shall be entitled
to vote on matters brought before the Rescue Commission.
1. One member shall be appointed by the Oconee County Rescue Squad Chiefs and one member shall
be appointed by the Oconee County Emergency Services Rescue Chief, and such members may
reside anywhere within the County.
2. County Council shall appoint the remaining five members, with one member to be nominated for
appointment by each County Council member from his or her respective district. All members of
the Commission appointed by County Council must be, and remain, residents of the County Council
district from which they are appointed to serve.
3. All commissioners must remain active rescue squad members in good standing in Oconee County.
4. Appointment of new members under this ordinance shall be held within forty-five (45) days of the
enactment of this ordinance or as soon thereafter as reasonably possible. The Oconee County Rescue
Squad Advisory Commission commissioners that are in office at the time of the enactment of this
ordinance shall be succeeded by a new slate of commissioners to be appointed under this section. The
current commissioners shall continue to serve, however, until th eir successors are appointed
hereunder, and current commissioners may be appointed to the Commission reorganized hereby.
(b) Term of members.
1. The length of the term served by each commissioner appointed by County Council shall be four
years, beginning on January 1 of the year of appointment.
2. For the purposes of implementing the standards of this section and thereby establishing a
reappointment / replacement schedule of the membership of the Commission to staggered terms,
the initial term of all members appointed by County Council after the enactment of this ordinance
shall be the same length as the remaining term of the Council member who nominated them.
3. After the initial appointment, the term of each Commission member appointed by County
Council shall be four years, equal to and coinciding with the term of the Council member
nominating them, with all terms beginning as of January 1 of the year of appointment or
reappointment.
4. The Oconee County Rescue Squad Chiefs and the Oconee County Emergency Services Rescue
Chief shall appoint or reappoint their respective commissioners annually.
5. Commissioners ultimately serve at Council’s pleasure and may be removed by Council, with or
without cause, by a vote of a positive majority of Council. There are no term limits.
Sec. 10-33. – Meetings and officers.
(a) The Rescue Commission shall meet at least monthly at a time and place selected by the membership
thereof or at a place designated by County Council . Within sixty ( 60) days of the passage of this
ordinance and the appointment of the Rescue Commission members hereunder, or as soon thereafter
as reasonably possible, and thereafter during the January meeting of each year, there shall be selected
a chairman, a vice-chairman, and a secretary, together with such other officers as the Rescue
Commission may deem necessary. These officers shall serve for one year, or until their successors are
duly elected and qualified. The terms of the officers elected from the initial Commission established
after enactment of this ordinance shall end December 31, 2025.
(b) In addition, the Rescue Commission may adopt such by-laws as it deems necessary for the orderly
performance of its duties and functions. Any by- laws which may be adopted by the Rescue
Commission for the orderly performance of its duties must comply with th is article, all applicable
ordinances of the County, and the laws of the State of South Carolina, specifically i ncluding, but
not limited to, the Freedom of Information Act. All meetings shall be open to the public. Notice of
the meetings shall be given to the Clerk to Co unty Council, the media, and the public in a manner
consistent with the Freedom of Information Act.
Sec. 10-34. – Powers and duties. The powers and duties of the Rescue Commission shall be as follows:
(a) To advise the County Council’s Law Enforcement, Public Safety, Health & Welfare Committee (or
“Committee”) on matters affecting the operation and activities of the various rescue squads and other
emergency protection service agencies of the County and to formulate plans and advise the Committee on
the operation and maintenance of the rescue squads and emergency protection service agencies and
their equipment, personnel, and training.
(b) To submit its advice and counsel to the Law Enforcement, Public Safety, Health & Welfare Committee
in the form of oral and/or written reports for consideration at the Committee’s quarterly meetings, which
reports shall summarize the activities, findings, and functions of the Commission, together with the
agenda for the Commission’s next meeting, all of which shall be submitted to the chairman of the Law
Enforcement, Public Safety, Health & Welfare Committee or his/her designee within a reasonable
time prior to the Committee’s respective meeting.
(c) To participate in the formulation of the budget and budgetary appropriations affecting the areas of
concern of the Rescue Commission for County Council consideration.
(d) To prepare plans and recommendations to the Law Enforcement, Public Safety, Health & Welfare
Committee in the areas of the Commission’s responsibility and activity, with recommendations for the
implementation of such plans.
(e) To generally advise the County Council’s Law Enforcement, Public Safety, Health & Welfare
Committee on any matter within the scope of the Rescue Commission’s activities, which would tend to
improve the efficiency and beneficial operation of County government in the fields of activity with
which the Rescue Commission is concerned.
(f) Each commissioner appointed by County Council shall visit each r escue squad within the
commissioner’s respective County Council district, and meet with the chief(s) thereof, as frequently
as necessary in order to stay informed of the business and operations of such squads.
(g) Any advice or recommendations conveyed to the Law Enforcement, Public Safety, Health & Welfare
Committee may be prepared and presented (1) orally by the Chairman of the Rescue Commission at a
regularly scheduled quarterly meeting of the Committee, after due notice for agenda purposes, or (2) in
writing forwarded to the Committee Chairman and Clerk to Council for dissemination to Committee
members.
Sec. 10-35. – Salaries and funding.
Each member of the Rescue Commission shall be paid the sum of $100.00 dollars per year, plus expenses
for out-of-county travel, as their sole compensation. Any expense item or claim for same shall first be approved
by the Chairman of the Commission, unless the same is made by the Chairman, and submitted for approval and
payment to County Council, consistent with the County’s then current budget and procurement policies . In no
event shall any member of the Commission be entitled to any other compensation, direct or indirect, for services
on the C ommission, and the members of the Commission shall not provide any services, materials, products,
goods, or equipment to the County unless the same is sold or offered for sale in accordance with existing County
and state purchasing procedures and ethical requirements.
2025-16
STATE OF SOUTH CAROLINA
COUNTY OF OCONEE
ORDINANCE 2025-16
AN ORDINANCE AMENDING CHAPTER 10 (EMERGENCY
MANAGEMENT AND SERVICES) OF THE OCONEE COUNTY
CODE OF ORDINANCES BY REVISING THE PROVISIONS OF
ARTICLE II.B. “FIRE SERVICE ADVISORY COMMISSION” ;
AND OTHER RELATED MATTERS.
WHEREAS, consistent with the powers granted county governments by S.C. Code § 4-9-
25 and S.C. Code § 4-9-30, Oconee County (“County”), a body politic and corporate and a political
subdivision of the State of South Carolina, acting by and through its governing body, the Oconee
County Council (“County Council”), has the authority to enact regulations, resolutions, and
ordinances, not inconsistent with the Constitution and the general law of the State of South
Carolina, including the exercise of such powers in relation to health and order within its boundaries
and respecting any subject as appears to it necessary and proper for the security, general welfare,
and convenience of the County or for preserving healt h, peace, order, and good government
therein;
WHEREAS, the County has adopted multiple ordinances for the effective, efficient
governance of the County, which, subsequent to adoption, are codified in the Oconee County Code
of Ordinances (“Code of Ordinances”), as amended; and
WHEREAS, County Council recognizes that there is a need to revise the law of the County
to meet the changing needs of the County, and that there is a need to amend, specifically, Chapter
10 (Emergency Management and Services) of the Oconee County Code of Ordinances by revising
the provisions of Article II.B. “Fire Service Advisory Commission” in order to reorganize the Fire
Service Advisory Commission, its responsibilities and reporting procedures ; and to affirm and
preserve all other provisions of the Code of Ordinances not specifically or by implication amended
thereby.
NOW, THEREFORE, it is hereby ordained by the Oconee County Council, in meeting
duly assembled, that:
1. Article II.B. “Fire Service Advisory Commission” of Chapter 10 ( Emergency
Management and Services) of the Oconee County Code of Ordinances is hereby revised, amended,
and restated as set forth in Exhibit A, attached hereto and incorporated herein by reference.
2. Should any part or provision of this Ordinance be deemed unconstitutional or
unenforceable by a court of competent jurisdiction, such determination shall not affect the rest and
remainder of this Ordinance, all of which is hereby deemed separable.
3. All ordinances, orders, resolutions, and actions of County Council inconsistent
herewith are, to the extent of such inconsistency only, hereby repealed, revoked, and rescinded.
2025-16
4. All other terms, provisions, and parts of the Code of Ordinances not amended
hereby, directly or by implication, shall remain in full force.
5. This Ordinance shall take effect and be in full force from and after third reading
and enactment by County Council.
ORDAINED in meeting, duly assembled, this ____ of ________________, 2025.
ATTEST:
Jennifer C. Adams Matthew Durham
Clerk to Oconee County Council Chair, Oconee County Council
First Reading: August 18, 2025
Second Reading: September 02, 2025
Third Reading: September 16, 2025
Public Hearing: September 16, 2025
ARTICLE II.B. FIRE SERVICE ADVISORY COMMISSION
Sec. 10-40. - Purpose of article.
The purpose of this article is to restructure the Oconee County Fire Service Advisory Commission, whose
mission is to provide a body of active members of the Oconee County fire service to be responsible for guidance, advice,
and recommendations to the Oconee County Council (“County Council” or “Council”) on current and future fire
service activities and needs in Oconee County (“County”).
Sec. 10-41. – Reorganization of the Oconee County Fire Service Advisory Commission.
The County Council hereby reorganizes the Oconee County Fire Service Advisory Commission (the “Fire
Commission” or “Commission”) as follows:
(a) Membership. The Fire Commission shall consist of seven members, all of which shall be entitled to
vote on matters brought before the Fire Commission.
1. One member shall be appointed by the Oconee County Fire Chiefs ’ Association, Inc. and one
member shall be appointed by the Oconee County Emergency Services Fire Chief , and such
members may reside anywhere within the County.
2. County Council shall appoint the remaining five members, with one member to be nominated for
appointment by each County Council member from his or her respective district. All members of
the Commission appointed by County Council must be, and remain, residents of the County Council
district from which they are appointed to serve.
3. All commissioners must remain active fire service members in good standing in Oconee County.
4. Appointment of new members under this ordinance shall be held within forty-five (45) days of the
enactment of this ordinance or as soon thereafter as reasonably possible. The Oconee County Fire
Service Advisory Commission commissioners that are in office at the time of the enactment of this
ordinance shall be succeeded by a new slate of commissioners to be appointed under this section. The
current commissioners shall continue to serve, however, until their successors are appointed
hereunder, and current commissioners may be appointed to the Commission reorganized hereby.
(b) Term of members.
1. The length of the term served by each commissioner appointed by County Council shall be four
years, beginning on January 1 of the year of appointment.
2. For the purposes of implementing the standards of this section and thereby establishing a
reappointment / replacement schedule of the membership of the Commission to staggered terms,
the initial term of all members appointed by County Council after the enactment of this ordinance
shall be the same length as the remaining term of the Council member who nominated them.
3. After the initial appointment, the term of each Commission member appointed by County
Council shall be four years, equal to and coinciding with the term of the Council member
nominating them, with all terms beginning as of January 1 of the year of appointment or
reappointment.
4. The Oconee County Fire Chiefs’ Association, Inc. and the Oconee County Emergency Services
Fire Chief shall appoint or reappoint their respective commissioners annually.
5. Commissioners ultimately serve at Council’s pleasure and may be removed by Council, with or
without cause, by a vote of a positive majority of Council. There are no term limits.
Sec. 10-42. – Meetings and officers.
(a) The Fire Commission shall meet at least monthly at a time and place selected by the membership
thereof or at a place designated by County Council . Within sixty ( 60) days of the passage of this
ordinance and the appointment of the Fire Commission members hereunder, or as soon thereafter as
reasonably possible, and thereafter during the January meeting of each year, there shall be selected a
chairman, a vice-chairman, and a secretary, together with such other officers as the Fire Commission
may deem necessary. These officers shall serve for one year, or until their successors are duly elected
and qualified. The terms of the officers elected from the initial Commission established after
enactment of this ordinance shall end December 31, 2025.
(b) In addition, the Fire Commission may adopt such by- laws as it deems necessary for the orderly
performance of its duties and functions. Any by- laws which may be adopted by the Fire
Commission for the orderly performance of its duties must comply with th is article, all applicable
ordinances of the County, and the laws of the State of South Carolina, specifically i ncluding, but
not limited to, the Freedom of Information Act. All meetings shall be open to the public. Notice of
the meetings shall be given to the Clerk to County Council, the media, and the public in a manner
consistent with the Freedom of Information Act.
Sec. 10-43. – Powers and duties. The powers and duties of the Fire Commission shall be as follows:
(a) To advise the County Council’s Law Enforcement, Public Safety, Health & Welfare Committee (or
“Committee”) on matters affecting the operation and activities of the various fire stations and other
emergency protection service agencies of the County and to formulate plans and advise the Committee
on the operation and maintenance of the fire stations and emergency protection service agencies and
their equipment, personnel, and training.
(b) To submit its advice and counsel to the Law Enforcement, Public Safety, Health & Welfare
Committee in the form of oral and/or written reports for consideration at the Committee’s quarterly
meetings, which reports shall summarize the activities, findings, and functions of the Commission,
together with the agenda for the Commission’s next meeting, all of which shall be submitted to the
chairman of the Law Enforcement, Public Safety, Health & Welfare Committee or his/her designee
within a reasonable time prior to the Committee’s respective meeting.
(c) To participate in the formulation of the budget and budgetary appropriations affecting the areas of
concern of the Fire Commission for County Council consideration.
(d) To prepare plans and recommendations to the Law Enforcement, Public Safety, Health & Welfare
Committee in the areas of the Commission’s responsibility and activity, with recommendations for the
implementation of such plans.
(e) To generally advise the County Council’s Law Enforcement, Public Safety, Health & Welfare
Committee on any matter within the scope of the Fire Commission’s activities, which would tend to
improve the efficiency and beneficial operation of County government in the fields of activity with
which the Fire Commission is concerned.
(f) Each commissioner appointed by County Council shall visit each fire station within the
commissioner’s respective County Council district, and meet with the chief(s) thereof, as frequently
as necessary in order to stay informed of the business and operations of such stations.
(g) Any advice or recommendations conveyed to the Law Enforcement, Public Safety, Health & Welfare
Committee may be prepared and presented (1) orally by the Chairman of the Fire Commission at a
regularly scheduled quarterly meeting of the Committee, after due notice for agenda purposes, or (2) in
writing forwarded to the Committee Chairman and Clerk to Council for dissemination to Committee
members.
Sec. 10-44. – Salaries and funding.
Each member of the Fire Commission shall be paid the sum of $100.00 dollars per year, plus expenses
for out-of-county travel, as their sole compensation. Any expense item or claim for same shall first be approved
by the Chairman of the Commission, unless the same is made by the Chairman, and submitted for approval and
payment to County Council, consistent with the County’s then current budget and procurement policies . In no
event shall any member of the Commission be entitled to any other compensation, direct or indirect, for services
on the C ommission, and the members of the Commission shall not provide any services, materials, products,
goods, or equipment to the County unless the same is sold or offered for sale in accordance with existing County
and state purchasing procedures and ethical requirements.
R2025-03
STATE OF SOUTH CAROLINA
COUNTY OF OCONEE
RESOLUTION 2025-03
A RESOLUTION APPOINTING AND COMMISSIONING THE
FOLLOWING PERSONS: TANYA LYNN SPALTI , MEGAN AL YCIA
VAN WAGNER, AND MARKEEL DANTONIO DETRO LEONARD AS
CODE ENFORCEMENT OFFICERS ( ANIMAL CONTROL) FOR THE
PROPER SECURITY, GENERAL WELFARE, AND CONVENIENCE OF
OCONEE COUNTY; AND OTHER MATTERS RELATED THERETO.
WHEREAS, Oconee County, South Carolina (the “County”) , is a body politic and
corporate and a political subdivision of the State of South Carolina;
WHEREAS, consistent with the powers granted to county governments by S.C. Code § 4-
9-30 and pursuant to S.C. Code § 4- 9-25, the County has the authority to enact r egulations,
resolutions, and ordinances not inconsistent with the Constitution and general law of the State of
South Carolina, including the exercise of such powers in relation to health and order within its
boundaries and respect ing any subject as appears to be necessary and proper for the security,
general welfare, and convenience of the County or for the preservation of health, peace, order, and
good government therein;
WHEREAS, consistent with S.C. Code §§ 47-3-20 and 4-9-145 and O.C. Code §§ 20-30
through 32, the Oconee County Council (the “Council”) may appoint and commission, by
resolution, as many code enforcement officers as may be necessary for the proper security, general
welfare, and convenience of the County; and,
WHEREAS, in order to promote a clean, healthy, and safe environment for the citizens of
Oconee County, the Council deems it proper to appoint and commission code enforcement officers
(animal control) authorized to carry out all tasks necessary and incidental to enforce those Oconee
County ordinances related to the proper security, general welfare, and convenience of the County
in connection with animal control.
NOW THEREFORE, be it resolved by Council in meeting duly assembled that:
Section 1
. The following persons: Tanya Lynn Spalti, Megan Alycia Van Wagner, and
Markeel Dantonio Detro Leonard are hereby appointed and commissioned as code enforcement
officers for Oconee County for the purpose of providing for the proper security, general welfare,
and convenience of the County, replete with all the powers and duties conferred by law upon
constables in addition to such duties as may be imposed by the governing body of the County, and
with all the powers and duties conferred pursuant to the provisions of S.C. Code § 4- 9-145.
Provided, however, these individuals shall not perform any custodial arrests in the exercise of their
duties as code enforcement officers.
R2025-03
Section 2. The code enforcement authority possessed by these individuals shall extend
throughout the entirety of Oconee County, but such authority shall be limited to enforcing those
ordinances and regulations that are related to the proper security, general welfare, and convenience
of the County as regards animal control. All enforcement activities shall be conducted in a manner
consistent with local, state, and federal law.
Section 3. The County Administrator, with the consent of the Oconee County Sheriff,
shall execute and provide each code enforcement officer with a C ertificate of Commission and
such other credential s as are deemed necessary to serve as evidence of their appointment and
commissioning hereby.
Section 4. Each of the above-named persons shall serve as code enforcement officers
until their appointment and commission is revoked or their employment with Oconee County
terminates.
Section 5. Should any term, provision, or content of this Resolution be deemed
unconstitutional or otherwise unenforceable by a court of competent jurisdiction, such
determination shall have no effect on the remainder of this Resolution.
Section 6. This Resolution shall take effect and be in force immediately upon
enactment.
RESOLVED this _____ day of ______________, 2025, in meeting duly assembled.
ATTEST:
Jennifer C. Adams Matthew Durham
Clerk to Oconee County Council Chair, Oconee County Council
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda
Items Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each
Council meeting. It is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained
prior to submission to the Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
AGENDA ITEM SUMMARY
OCONEE COUNTY, SC
COUNCIL MEETING DATE: September 2, 2025
COUNCIL MEETING TIME: 6:00 PM
ITEM TITLE OR DESCRIPTION:
PRT Commission-Local ATAX Recommendations / Fall 2025 Cycle / $70,000
BACKGROUND OR HISTORY:
A portion of Local ATAX revenues received by Oconee County are made available for ATAX grants
through Ordinance 2011-12. ATAX grants are to be tourism related grants that meet the ATAX guidelines
specified by local and State mandates. Grants are recommended by the PRT Commission based on tourism
impact of the project and approved by County Council. All external ATAX grant recipients are required to turn
in intermediate reports every 180 days to the progress of the grant and a final report upon completion of the
grant. These reports are placed in the grant folder, which is kept active by the PRT staff until the grant is
considered complete. Internal projects through Oconee PRT are also funneled through local ATAX for eligible
projects.
SPECIAL CONSIDERATIONS OR CONCERNS:
COMPLETE THIS PORTION FOR ALL PROCUREMENT REQUESTS:
Does this request follow Procurement Ordinance #2001-15 guidelines? No [review #2001-15 on Procurement’s website]
If no, explain briefly: NO-ATAX grants
FINANCIAL IMPACT:
Beginning Local ATAX balance $649,588
If all grants/projects approved/new balance will be: $579,588
COMPLETE THIS PORTION FOR ALL GRANT REQUESTS:
Are Matching Funds Available: Yes
If yes, who is matching and how much: Varies by grant!
ATTACHMENTS
Spreadsheet approved by PRT Commission on 8.21.25.
STAFF RECOMMENDATION:
Request approval of local ATAX recommendations per the attached spreadsheet.
Reviewed By/ Initials:
______County Attorney ________Finance _________ Grants _______ Procurement
Submitted or Prepared By: Approved for Submittal to Council:
__Phil Shirley, PRT Director_ __
__________________________________
Department Head/Elected Official Amanda Brock, County Administrator
Amount PRT
Funds Eligible for Commission
Request Project Description ATAX Recommendation
City of Seneca $6,000 WSPA Advertising "Race for the Green" $6,000 $4,500
City of Walhalla $10,106 Trails Map/Signage-Stumphouse Mountain Park $10,106 $7,000
City of Westminster $7,709 Sports Complex bleachers $7,709 $7,000
Devils Fork State Park $13,690 Renovate tent impact pads-camping sites $11,768 $6,000
Discover Upcountry SC $15,000 Advertising-Print and Digital $15,000 $6,000
Downtown Seneca Merchants Assoc $1,500 Advertising - Sip-N-Stroll $900 $900
Eagles Nest Arts Center $13,950 Advertising, Maintenance, Electrical, Signage, Suppli $13,950 $6,500
South Carolina Bigfoot Festival $15,000 Advertising, Truss system for stage $15,000 $9,600
The FARM Center $11,517 Advertising, Public Services-Heritage Fair $11,517 $6,000
Walhalla Performing Arts Center $12,000 Advertising 2025/2026 Fall & Winter Season $12,000 $6,000
Westminster Music Centre $10,000 Advertising and Production Concert Series $9,040 $4,000
Wild Hearts Equine Center $9,760 Nature Trail signage & Visitor center creation $9,760 $6,500
TOTAL $126,232 $122,750 $70,000
TOTAL $0 $0 $0
Total Requested $70,000
Sep-25
Local ATAX Grants
Applicant
PRT Internal Request
Council has directed that they receive their agenda packages a week prior to each Council meeting, therefore, Agenda Items
Summaries must be submitted to the Administrator for his review/approval no later than 12 days prior to each Council meeting. It
is the Department Head / Elected Officials responsibility to ensure that all approvals are obtained prior to submission to the
Administrator for inclusion on an agenda.
A calendar with due dates marked may be obtained from the Clerk to Council.
AGENDA ITEM SUMMARY
OCONEE COUNTY, SC
COUNCIL MEETING DATE: September 2, 2025
COUNCIL MEETING TIME: 6:00 PM
ITEM TITLE [Brief Statement]:
Request for Council’s consideration to support the Oconee County application for the Hazard Mitigation Grant Program
application and approval to commit matching funds, not to exceed $11,500, if awarded, for the Oconee County Hazard
Mitigation Plan Development project.
BACKGROUND DESCRIPTION:
• The application is for the development of the Oconee County Hazard Mitigation Plan.
• The estimated cost for the project totals $46,000.
• The Hazard Mitigation Grant Program has a 25% local match requirement, up to $11,500.
• Oconee County currently has a Multi-Jurisdictional Hazard Mitigation Plan with Anderson County, approved in
March 2023.
• The grant would fund a consultant that would work with Oconee County, local municipalities, community
stakeholders and the public to establish the Oconee County Hazard Mitigation Plan, specifically addressing the unique
needs of the area.
• Oconee County identified the need to establish its own Hazard Mitigation Plan based on various factors: (1) Oconee
County has a nuclear power plant and Anderson does not; (2) Oconee County has significant bodies of water,
compared to Anderson County, as well as varying terrain; (3) Oconee County has had several declared disasters since
2020, including an EF-3 tornado and Hurricane Helene; and (4) Oconee County has experience significant growth and
development in recent years.
SPECIAL CONSIDERATIONS OR CONCERNS [only if applicable]:
FINANCIAL IMPACT [Brief Statement]:
Oconee County requests the commitment of matching local funds, contingent on the award from the Hazard Mitigation
Grant Program.
ATTACHMENTS:
Project Information
STAFF RECOMMENDATION [Brief Statement]:
It is the staff’s recommendation that Council approve the commitment of matching funds, not to exceed $11,500, toward
the Oconee County Hazard Mitigation Grant Program application for the establishment of the Oconee County Hazard
Mitigation Plan.
Prepared by: Approved for Submittal to Council:
__________________________ _____________________________________
Brittney Martin, Grants Administrator Amanda F. Brock, County Administrator
Project Information
Current planning regulations require specific information be included in local mitigation plans. The following
questions address how your community intends to accomplish some of those aspects. For areas where specific
strategies have not been determined, please estimate.
List all municipalities
(county/city) the proposed
plan will address. If not multi-
jurisdictional, explain why that
decision was made.
The geographic scope for the plan includes all of Oconee County and includes the incorporated
and unincorporated areas. The participating jurisdictions include Salem, Seneca, Walhalla, West
Union and Westminster.
Oconee County would like to transition away from a multi-jurisdictional plan due to the county-
specific terrain and hazards that Oconee County Emergency Services respond to on a regular
basis. Oconee County identified the need to establish its own Hazard Mitigation Plan based on
various factors: (1) Oconee County has a nuclear power plan and Anderson does not; (2) Oconee
County has significant bodies of water, compared to Anderson County, as well as varying terrain;
(3) Oconee County has had several declared disasters since 2020, including an EF-3 tornado and
Hurricane Helene; and (4) Oconee County has experience significant growth and development in
recent years. Oconee County is dedicated to mitigating threats to human life, safety and property.
While threats from man-made and natural hazards may never be fully eliminated, Oconee County
strives to lessen the potential impacts on our community and citizens through hazard mitigation.
This project aims to identify hazards, unique to Oconee County, and develop a plan to comply
with DEMA regulations, ensuring continued eligibility for federal disaster assistance and mitigation
funding. The plan will also serve as a resource for Oconee County Emergency Services to protect
the health and safety of the citizens, residents and visitors in Oconee County.
Attach letters of agreement
for each jurisdiction involved
in the plan (multi-jurisdictional
planning only).
List the hazards to be
addressed (i.e., flooding,
earthquake, ice, etc.).
Drought
Heat Wave
Extreme Cold
Extreme Heat
Severe Thunderstorms
Hail Storms
Hurricane / Tropical Storms
Floods
Earthquakes
Landslides
Erosion
Dam and Levee Failure
wildfires
Winter Storms
Tornadoes / High Winds
The regulations do not
specify inclusion of human-
caused hazards (i.e.,
radiological, hazardous
materials, terrorism, etc.), but
do encourage the integration
of such. If human-caused
hazards will be addressed,
please list the types you will
be studying.
Radiological
Hazardous Materials
Technological Hazards
Terrorism
Transportation Incident
Describe the area and
population affected by this
project, including location. For
multi-jurisdictional planning,
specify each jurisdiction's
information.
Oconee County is 625 square miles and is host to significant environmental resources, including
three major lakes, various state and county parks, Sumter National Forest, various wilderness
areas and four major rivers. Oconee County adjoins ten other counties across three states and
has experienced exponential growth in population and development over the last five years.
Oconee County is also home the Oconee Nuclear Stations, Duke Energy's largest nuclear power
plant.
Oconee County's population is estimated at 82,475 (2024 Census) with 25.4% of the population
comprised of people who are 65 or older. The region is primarily rural with small towns and some
cities spread throughout the area. Seneca, the largest city in Oconee County has population
figures around 8,424. Many of the small towns rely heavily on County government to provide them
with technical assistance for planning functions.
Oconee County is in the northwest corner of South Carolina. Interstate 85 bisects the region,
providing access to many markets in the southeastern United States. Interstate 85 also provides
easy access to Charlotte and Atlanta. This is one of the fastest growing regions in the United
States. This corridor is characterized by strong economic growth, job creation, and low
unemployment. A high quality of life is reflected in lower cost of living standards, affordable home
prices, and proximity to many of the recreational amenities people desire.
Oconee County is home to KCEU, the Oconee County Regional Airport. The airport services local
and private aircrafts along with general aviation airports, and serves as a major destination point
for patrons of Clemson University events/football games. Flight instruction is also available at the
airport. Rail service in Anderson and Oconee county is provided by CSX Transportation and
Norfolk Southern Corporation which operate the first and second longest track routes in the state,
respectively.
Describe how the community
will ensure the planning
process will include public
involvement and/or comment.
Oconee County will host Hazard Mitigation community meetings and workshops and the plan will
be presented to Oconee County Council in a public meeting for final approval.
Describe how the community
will ensure the planning
process will include
neighboring communities,
local and regional agencies
involved in hazard mitigation
activities, and agencies that
have the authority to regulate
development, as well as
business, academia and
other private and non-profit
interests involvement.
Oconee County and the jurisdictions will work with a consultant to host meetings comprised of
representatives from county and municipal departments, as well as other key stakeholders
identified, to serve as critical partners in the planning process.
Describe how the community
will ensure the planning
process will include a hazard
mitigation planning team that
incorporates a broad range of
expertise/knowledge of the
area(s) involved which will
serve an integral part in the
plan development phases of
risk assessment, vulnerability
analysis, mitigation strategy
and plan maintenance.
The consultant and community stakeholders, county personnel and community members will
engage in regular discussions as well as hold local meetings and planning workshops to discuss
and complete tasks associated with preparing the Plan. This working group will coordinate on all
aspects of plan preparation and provide valuable input to the process. In addition to regular
meetings, representatives from the county and jurisdictions will routinely communicate and stay
informed through an e-mail distribution list.
Describe how the community
will ensure the planning
process will include review
and incorporation, if
appropriate, of existing plans,
studies, reports, and technical
information.
The consultant, staff and community stakeholders will review and provide timely comments on all
study findings and draft plan deliverables.
Describe the Scope of Work
(SoW). (Upload supporting
documentation via the "Add
Document" button in the
footer section).
This project includes a full establishment of the Oconee County Hazard Mitigation Plan,
incorporating new risk assessments, mitigation strategies, and stakeholder engagement specific
to Oconee County.
Phase 1: Project Initiation & Data Collection
Kickoff Meeting Meet with Oconee County officials to outline project scope, expectations, and
data needs.
Stakeholder Identification Identify key agencies, businesses, and community groups for input.
Data Retrieval & Research Gather county- specific hazard data from FEMA, NOAA, USGS, state
agencies, and local sources.
Gap Analysis Review the existing Anderson-Oconee HMP to determine missing or outdated
information.
Phase 2: Risk Assessment & Analysis
Hazard Identification & Prioritization Assess county-specific hazards, including:
Severe Weather (hurricanes, floods, tornadoes)
Large Lake & Dam Risks (dam failure scenarios, flooding impacts)
Nuclear Facility Hazards (potential incidents, emergency response planning)
Social Vulnerability Assessment Identify populations and infrastructure most at risk.
GIS Hazard Mapping Develop updated maps to visualize hazard-prone areas.
Economic Impact Analysis Estimate potential losses and damages from each hazard.
Phase 3: Mitigation Strategy Development
Set Mitigation Goals & Objectives Define strategies to reduce disaster risks.
Develop & Prioritize Mitigation Actions Identify specific projects, responsible parties, and funding
sources.
Cost Analysis & Funding Plan Align projects with potential FEMA, state, and local funding
opportunities.
Integration with Local Planning Efforts Ensure alignment with Oconee County s comprehensive
plan, emergency operations plan, and zoning regulations.
Phase 4: Public & Stakeholder Engagement
Public Meetings & Workshops Facilitate at least two public engagement sessions to gather input.
Online Public Survey Collect feedback from residents on hazard concerns and preparedness
levels.
Agency & SME Consultations Engage with dam operators, nuclear facility representatives,
emergency services, and local businesses.
Interagency Coordination Work with regional and state partners for consistency and compliance.
Phase 5: Plan Drafting, Approval & Adoption
Draft HMP Report Develop a full FEMA-compliant hazard mitigation plan.
Internal Review & Revisions Work with Oconee County to refi ne content.
SCEMD & FEMA Submission Submit the final plan to the South Carolina Emergency
Management Division (SCEMD) for initial review, then to FEMA for formal approval.
Plan Adoption Present the final, approved plan to Oconee County Council for formal adoption.
Describe previous hazard
mitigation planning and
implementation activities in
the community.
The most recent hazard mitigation plan was completed in 2023. It has been attached for
reference.
Enter any additional
comments related to the
proposed planning effort, if
desired.
Oconee County
Council
Oconee County
Administrative Offices
415 South Pine Street
Walhalla, SC 29691
Phone: 864-718-1023
Fax: 864 718-1024
E-mail:
jennifercadams@oconeesc.com
John Elliott
District I
Matthew Durham
Chairman
District II
Don Mize
Vice Chairman
District III
Thomas James
District IV
J. Glenn Hart
Chairman Pro Tem
District V
The Oconee County Council will meet in 2025 on the first and third Tuesday of each
month with the following exceptions:
• July, August, and November meetings, which will
be only on t he third Tuesday of each of these
months;
• March, June and December meetings, which will
be only on the first Tuesday of each of these
months.
All Council meetings, unless otherwise noted, are held in Council Chambers,
Oconee County Administrative Offices, 415 South Pine Street, Walhalla, South
Carolina.
Oconee County Council will also hold a Planning Retreat beginning at 9:00
a.m. on Thursday, February 20, 2025 to establish short- and long-term goals. This
meeting will be held off-site in the Tri-County Technical College, Oconee Campus,
conference room located at 552 Education Way, Westminster, South Carolina.
Oconee County Council will also meet on Tuesday, January 6, 2026 in
Council Chambers at which point they will establish their 2026 Council and
Committee meeting schedules.
Additional Council meetings, workshops, and/or committee meetings may
be added throughout the year as needed.
Oconee County Council Committees will meet in 20 25 prior to County
Council meetings on the following dates/times in Council Chambers located at 415
South Pine Street, Walhalla, South Carolina unless otherwise advertised.
The Law Enforcement, Public Safety, Health, & Welfare Committee at
4:30 p.m. on the following dates: February 18, May 2 0, July 15, &
September 16, 2025.
The Transportation Committee at 4:30 p.m. on the following dates: February
18, May 20, July 15, & September 16, 2025.
The Real Estate, Facilities, & Land Management Committee at 4:30 p.m. on
the following dates: April 1, June 3, August 19, & October 21, 2025.
The Planning & Economic Development Committee at 4:30 p.m. on the
following dates: April 1, June 3, August 19, & October 21, 2025.
The Budget, Fina nce, & Administration Committee at 9:00 a.m. on t he
following dates: February 20
[Strategic Planning Retreat] and 4:30 p.m. on the following
dates: March 4 [4 p.m.], April 15, & May 6, 2025.
Source: Oconee County website. First collected Nov 7, 2026.