RecordWell Data

Planning Commission Meeting — Agenda Packet

Pickens County · Pickens County · Planning Commission · meeting of Jan 13, 2025 · Agenda packets

Open the original document More from Pickens County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

January 2025 LU-24-0009 Hagan RV Park www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864) 271-0496 CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS© EASLEYPICKENS COUNTYSOUTH CAROLINA RECREATIONAL VEHICLE (RV) PARKS & CAMPGROUND SITE NOTES(PER PICKENS COUNTY):1.NO SITE SHALL BE USED AS A PERMANENT RESIDENCE AND SHALL ONLY BE FOR THE USE OFTRAVEL TRAILERS, PICKUP CAMPERS, COACHES, MOTOR HOMES, CAMPING TRAILERS, OTHERVEHICLE ACCOMMODATIONS, TENTS, PARK MODEL UNITS, AND ON-SITE RENTAL CABINS. NOSITE MAY BE USED FOR MORE THAN ONE HUNDRED EIGHTY (180) DAYS IN ANY CALENDAR YEARBY THE SAME OCCUPANT.2.SITES MAY BE SERVED BY ON-SITE SEWAGE DISPOSAL SYSTEMS AS PERMITTED BY SCDHEC;HOWEVER, EACH INDIVIDUAL SITE MAY NOT BE SERVED WITH AN INDIVIDUAL SYSTEM.3.SITES WITHIN THE PARK THAT ARE NOT OTHERWISE SERVED WITH SEWAGE DISPOSALCONNECTION, AN ONSITE BATH HOUSE (PROVISIONS FOR RESTROOM AND BATHING FACILITIES)MUST BE PROVIDED.4.SITES SHALL NOT BE SERVED BY INDIVIDUALLY METERED POWER OR WATER SERVICE. WHENMULTIPLE SITES ARE BEING PROVIDED, MASTER METER(S) MUST PROVIDE SERVICE TO THEENTIRE PARK. ALL SITES MUST HAVE ACCESS TO PUBLIC WATER, EITHER DIRECTLY ORCOMMUNALLY. RIGHT AND LEFT IN,RIGHT OUT DRIVEWAY SEPTICFIELD STORMWATERPOND GRASSYOPEN AREA CAMPER PAD(20'X50' TYP = 1,000 SF) OFFICE ANDAMENITY AREA WITHSTORM SHELTERPULL THOUGHCAMPER PAD(20'X50' TYP) PROPERTY LINE HAYWOOD RD R/W LINE PULL OFF AREAFOR CHECK-IN HAYWOOD RD. TRIBUTARY TO GOLDENCREEK CENTERLINEJEFFREY & TERESA HAGAN341 HAYWWOD ROAD36.244 ACRES(INCLUDES ANY & ALL R/W) SITE DENSITY CALCULATIONS:CAMP GROUND - 4 SITES PER ACRE (36.24 ACRES X 4 SITES/ACRE = 144 SITES ALLOWABLE)REGULAR SITES PROVIDED:21SPACESHC SITES PROVIDED:1SPACESTOTAL SITES PROVIDED:22SPACESNOTE:1.A MINIMUM OF ONE (1) SITE MUST BE ADA ACCESSIBLE2.ALL SITES MUST BE A MINIMUM OF 690 SQ FT AND HAVE A STABILIZED AND COMPACTEDVEHICULAR PARKING PAD OF PACKED GRAVEL, PAVING, OR OTHER SUITABLE MATERIAL. 8910 7654 321 19 18 17 22 21 20 111213141516 100' SIDE SETBACK 20' FRONTSETBACK FROMR/W LINE 100.0' 24.0' 24.0'24.0' PROPOSEDPROPERTY LINE PROPOSEDPROPERTY LINE SITE DATASITE ADDRESS341 HAYWOOD ROADEASLEY, SC 29640OWNER/DEVELOPERJEFFREY & TERESA HAGANPROPOSED USERV PARKTAX MAP #R0014942PARCEL AREA8.34 ACRESSETBACKSFRONT: 20'SIDES: 100'REAR: 100' GRAVEL ROADS GRAVELROADS LU-24-0009: Hagan RV Park. Staff Report Planning Commission Public Hearing: January 13, 2025 6:30 PM The following report constitutes an assessment and evaluation by Planning staff on the above mentioned request. Applicant: Teresa Hagan 341 Haywood Rd. Easley, SC 29640 Property Owner(s): Teresa & Jeffrey Hagan Property Location: 341 Haywood Rd. Easley, SC 29640 Acreage: 6 acres Tax Map Number: 5009-18-32-2122 County Council District: 4 Land Use Request: LU-24-0009: The Land Use request is for a twenty two site RV park off of Haywood Rd. Variance Request(s) from Planning Commission: None Request Overview: The proposed RV park consists of twenty-two sites, utilizing approximately 6 acres of the 36.24-acre parcel. Access to the RV park will be from Haywood Road, which is maintained by SCDOT. Current Property Use: The property is listed on the Assess or’s s ite as residential and shows as such in the aerial photographs. Surrounding Area: The parcel is surrounded by residential areas to the North, East, and West. The South of the property appears to be vacant land. Utilities & Infrastructure Transportation: The property is served by Haywood Road. Emergency Services: Request a fire hydrant at the entrance. Stormwater: Will require Stormwater permit. Water: public water (Easley Combined) Sewerage: Onsite Septic Comments from Reviewing Agencies: Staff Analysis of Standards for Land Use Approval: Staff analysis of the application is made based upon the findings criteria as set forth in Section 1205(f) of the UDSO. The applicant has submitted his/her response to the same findings criteria. A. Is the proposed use consistent with other uses in the area or the general development patterns occurring in the area? The proposed use is not consistent with uses in the immediate area or the general development patterns in the area. B. Will the proposed use adversely affect the existing use or usability of adjacent or nearby property? With strict adherence to the development standards for the proposed uses, the proposed use should not adversely affect the existing use of adjacent property. C. Is the proposed use compatible with the goals, objectives, purpose , and intent of the Comprehensive Plan? The proposed use is not consistent with the Comprehensive Plan as it designates the area for Workplace Centers. D. Will the proposed use not cause an excessive or burdensome use of public facilities or services, including but not limited to streets, schools, water or sewer utilities, and police or fire protection? If developed according to the County development standards, the project should not burden existing facilities or services. E. Is the property suitable for the proposed use relative to the requirements set forth in this development ordinance such as off -street parking, setbacks, buffers, and access? The applicant’s proposal before the Commission will meet the respective standards as outlined in the Unified Development Standards Ordinance of Pickens County. F. Does the proposed use reflect a reasonable balance between the promotion of the public health, safety, morality, or general welfare and the right to unrestricted use of property? The proposed development should provide for a balance of competing interests. Sec. 302 Recreational Vehicle (RV) Parks and Campgrounds. 302 (a) Purpose. The purpose of this section is to provide opportunities for quality developed campgrounds and recreational vehicle parks that are properly sited where there is adequate public street access and adequate access to other public services which may be needed b y such endeavor. In order to create a desirable and successful recreation environment while protecting the public health, safety, and welfare, Planning Commission review and consideration will be required; unless exempted in the following sections. Two or more RVs on one single parcel constitutes an RV Park. 302 (b) Use Standards. (1) Each park or campground must have direct frontage and access to a collector or arterial street. Access to each individual site and other provided structures shall be from internal/private roads. Individual sites shall not be accessed directly from a public road. 1a. Roadways within an RV Park or Campground shall be constructed to all-weather standards: graveled road or road of equivalent materials that is passable by vehicles under both wet and dry weather conditions. 1b. All roadways shall have a minimum travel width of twelve feet (12”) for single lane travel and twenty -four feet (24”) for two lane travel, and a thirty -five foot (35”) turning radius required on all curves to allow access by emergency vehicles. (2) RV parks and campgrounds must be a minimum of five (5)-acres in size and shall not exceed ten (10)-acres in the Appalachian, Agricultural, and Natural Heritage Areas and must be a minimum of five (5) -acres in the Community Center and Gateway Areas. (3) No site shall be used as a permanent residence and shall only be for the use of travel trailers, pickup campers, coaches, motor homes, camping trailers, other vehicular accommodations, tents, park model units, and on-site rental cabins. No site may be used for more than one hundred eighty (180) days in any calendar year by the same occupant. (4) Overall density of the park or campground shall be limited to no more than four (4) sites per acre. (5) Minimum Space Size. A minimum net space of 690 square feet is required for each RV space. (6) Setbacks. RV Parks shall maintain a minimum setback of 100 feet rom all property lines. (7) Sites may be served by on-site sewage disposal system as permitted by SCDHEC; however, each individual site may not be served with an individual system. (8) For sites within the park that are not otherwise served with sewage disposal connections, an onsite bath house (provisions for restroom and bathing facilities) must be provided. (9) Sites shall not be served by individually metered power or water service. When multiple sites are being provided, master meter(s) must provide service to the entire park. All sites must have access to public water, either directly or communally. (10) For parks with more than four (4) sites a storm shelter shall be provided per IRC standards. (11) At the time of application for land use approval, RV parks and campgrounds must include a proper site management plan to be instituted once operational. (12) 911 Adressing is required for all RV parks and campgrounds. (13) Buffers. RV parks are subject to a Class ll Buffer (see Figure 8.2, Section 812 (14) Minimum Separation Between Recreational Vehicles. 1. A distance of a least 10 feet shall be maintained between recreational vehicles. 2. For the purpose of this requirement, accessory structures and accessories attached to an RV are considered a part of the recreational vehicle. Planning Staff Recommendation: The site plan will comply with the new standards approved by the County Council on November 4, 2024. Staff has informed the applicant that there is a 100 -foot setback requirement from all property lines, and a Class 2 buffer must be maintained within this setback area. The applicant has been asked by staff to clearly indicate the Class 2 buffer on the site plan. 61 CHAPTER 5 | LAND USE DRAFT | APRIL 2022 Character Areas Recreation and Open Space Community Commercial Center Agricultural Preservation Commercial Gateway CorridorRural Places Workplace Centers Residential Growth Institutional and Educational Urban Residential SR 11 Scenic Corridor Neighborhood Commercial Center Pickens County, SC Developed by Parcel ID    5009-18-32-2122 Account No   R0014942 Property Address    341 HAYWOOD RD EASLEY District A09-Easley Brief Tax Description  S/SIDE HIGHLAND RD EXT., PLAT 612/313 (Note: Not to be used on legal documents) Account Type   Residential Class   1 Story Acreage   36.244 LEA Code   0008.7 Value   $81,387 Ownership   HAGAN JEFFREY W 341 HAYWOOD RD EASLEY, SC 29640-0000 Documents Date   Price   Doc   Vacant or Improved   2/24/2021   $385,000   2247/ / 214   Improved   2/12/2021   $0   612 / 313   Improved   Date created: 12/2/2024 Last Data Uploaded: 12/2/2024 8:30:07 PM 590 ft Overview Legend Parcels 911 Address Roads January 2025 SDV-24-0003 Subdivision Variance April Valley Ln SDV-24-0003: Subdivision Variance April Valley Lane Staff Report Planning Commission Public Hearing: January 13, 2025 6:30 PM The following report constitutes an assessment and evaluation by Planning staff on the above mentioned request. Applicant: Scott & Shannon Patterson 112 Woodstone Drive Easley, SC 29642 Property Owner(s): Scott Patterson Property Location: 300 & 304 April Valley Lane, Pickens SC 29671 Acreage: 4 Tax Map Number: 5101-00-89-0912 County Council District: 3 Land Use Request: SDV-24-0003: Variance Request(s) from Planning Commission: The applicant is requesting a variance from Article 10 Sec. 1012 (c) Private Road standards of the Unified Development Standards Ordinance. Request Overview: This is a request to subdivide the properties at 300 April Valley Lane and 304 April Valley Lane into two separate two-acre lots for individual residences. The remaining area of 15.474 acres will be kept as vacant land. April Valley Lane is a private road that connects to Jameson Road, which is a state road. Current Property Use: The property is currently listed on the Assessor’s site as vacant land. The property is also denoted on the Assessor’s map with the two addresses of 300 and 304 April Valley Lane. Surrounding Area: The parcel is surrounded by residential areas to the West. April Valley RV Park is located to the South of the parcel. The North and East sides of the property appear to be vacant land. Utilities & Infrastructure Transportation: The property is served by April Valley Lane, which is a private road. Water: Public Water (Dacusville/Cedar Rock) Sewerage: Onsite Septic Private Road Standards 1012 (c) Private Roads. (1) The maximum number of lots which may be served by a private road shall be governed by Article 4 of this ordinance. (2) The private road shall be located within a designated right-of-way of at least fifty (50) feet in width and that right-of-way shall be owned and controlled by a homeowner’s association or other entity responsible for the road’s maintenance. (3) All lots must meet minimum Development Ordinance requirements for minimum frontage onto the private road. (4) Minimum lot size shall be governed by Article 4. (5) The private road cannot originate from a shared driveway or from a common drive. The private road may originate and connect to another private road provided that road meets the minimum requirements listed in this section. (6) The maintenance of the private road must be mutually agreed upon by the respective property owners and this maintenance agreement shall be outlined in an access agreement to be recorded with the Register of Deeds and individually noted within the respective deeds. (7) The following plat certification shall be placed upon every plat for every lot utilizing a private road: “The private road and associated right-of-way shown on this plat shall be a private access not owned, maintained, or supervised by Pickens County and not constructed pursuant to any plan for future acceptance by Pickens County. All easements and rights-of-way shown upon the plat shall not be accepted for maintenance by Pickens County at any time in the future unless constructed as a public road in accordance with The Pickens County Unified Development Ordinance, as amended.” (8) All subdivisions utilizing private roads for access must be approved by the Planning Commission in accordance with the procedures listed in Article 12. (9) Only those lots approved by the Planning Commission and platted with the private road may utilize said road. (10) The private road must be named; said name shall be approved by Pickens County E-911 staff. (11) Construction standards. The private road shall be constructed in accordance with the respective requirements for a public, local residential street. Planning Staff Recommendation: April Valley Lane does not meet the standards set forth in the Unified Development Standards Ordinance. Staff recommends against subdividing property off a substandard private road until the road is upgraded to meet the Private Road standards specified in Article 10, Section 1012 (c) of the Pickens County Unified Development Standards Ordinance. Pickens County, SC Developed by Parcel ID    5101-00-89-0912 Account No   R0093647 Property Address    300 APRIL VALLEY LN PICKENS District A13-Pickens Brief Tax Description  W/SIDE BLUE RIDGE RD PLAT 616/101 PLAT 614/157 PLAT 614/286 PLAT 614/293 PLAT 614/295 (Note: Not to be used on legal documents) Account Type   Vacant Land Class   n/a Acreage   19.494 LEA Code   0016 Value   $1,193 Ownership   PATTERSON SCOTT LEE 112 WOODSTONE DR GREENVILLE, SC 29611- 0000 Documents Date   Price   Doc   Vacant or Improved   8/30/2022   $305,000   2448/ / 257   Vacant   1/12/2022   $0   616 / 101   Vacant   Date created: 12/18/2024 Last Data Uploaded: 12/17/2024 8:24:56 PM 806 ft Overview Legend Parcels 911 Address Roads January 2025 LU-24-0010 Phase 2 Speedway Multi-Use Park ADDENDUM TO THE APPLICATION FOR LAND USE REVIEW/SUBDIVISION REVIEW APPLICATIONS FOR LAND USE AND SUBDIVISION REVIEW HEARINGS PICKENS COUNTY, SOUTH CAROLINA APPLICANT: SC SPEEDWAY HWY 124, LLC PROPERTY OWNER: ESTATE OF FRANCES L. MERCER, BY AND THROUGH HER PERSONAL REPRESENTATIVE ELIZABETH LARK MERCER HUNTER SIGNATURE PAGE ESTATE OF FRANCES L. MERCER - OWNER OF THE FOLLOWING PARCEL: Tax Map Number 5049-08-98-2239 consisting of approximately 12.9 acres ESTATE OF FRANCES L. MERCER Name: Elizabeth Lark Mercer Hunter Title: Personal Representative of the Estate of Frances L. Mercer Date: August 22 2024 Judson Mills Bldg 6000, Ste 6060, 701 Easley Bridge Rd, Greenville, SC 29611 (864) 298-0534 | SeamonWhiteside.com Mount Pleasant | Greenville | Summerville | Spartanburg | Charlotte Elevating the site design experience. Seamon Whiteside & Associates, Inc 701 Easley Bridge Road, Ste. 6060 Greenville SC, 29611 November 11, 2024 Pickens County Planning Department 222 McDaniel Avenue, B-10 Pickens, SC 29671 Letter of Intent Dear Trad, This letter is to inform you of the necessary information regarding the land use development. The property in question is to be used for an industrial park. Approximately 110 AC of the total 289 AC are being disturbed in the initial phase. 19 existing lots have been consolidated into five (5) lots. Six (6) buildings were approved for the multi-use commercial park per approval number LU-24-0004. Phase 2 will disturb approximately 153 AC of the total 289 AC, consolidating 6 lots into two (2) multi-use lots. Four (4) additional buildings will be constructed, comprising a total of no more than 2,900,000 SF. Your expeditious review is greatly appreciated. Ple ase contact me via phone at 843-333-5962 or email at rhall@seamonwhiteside.com if you have any questions or need further clarification for this project. Seamon Whiteside and Associates, Inc. Ryan Hall, P.E. Civil Engineering Director 124 123 (BUILDING 10)337,500 SF(450' X 750')FFE: 665.00 130' DEEP TRUCK COURT STORAGE LOT /TRAILER PARKING1 AC ± 130' DEEPTRUCK COURT 130' DEEPTRUCKCOURT ±100 PARKINGSPACES BUILDING 8337,500 SF(450' X 750') BUILDING 7251,100 SF310' x 810' STORAGE LOT /TRAILER PARKING1 AC ± 1.44 ACESTIMATEDDETENTIONPOND 250 PARKING SPACES BUILDING 2252,720 SF260' x 972'FFE ±966 BUILDING 3210,000 SF(600' X 350')FFE ±968 BUILDING 1267,840 SF310' x 864'FFE ±908 BUILDING 4STAMPINGINJECTION62,500 SF(250' X 250')FFE ±963 BUILDING 5PRODUCTIONEXPANSION210,000 SF(600' X 350')FFE ±958 BUILDING 6PRODUCTIONEXPANSION210,000 SF(600' X 350')FFE ±953 OFFICE17,500 SF50' x 350' OFFICE12,500 SF50' x 250' OFFICE12,500 SF50' x 250' OFFICE25,000 SF100' x 250' 203 PARKING SPACES 189 PARKING SPACES 189 PARKING SPACES 79 PARKING SPACES PAVILLION CROSWELL SCHOOL ROAD 0.80 ACESTIMATEDDETENTIONPOND 0.64 ACESTIMATEDDETENTIONPOND 250± PARKING SPACES 1.73 ACESTIMATEDDETENTIONPOND PHASE 1 ACCESS(TRUCK ACCESS) GEORGES CREEK CROSSWELL SCHOOLROAD (PRESCRIPTIVE R/W) PASSENGER AND EMERGENCYVEHICLE ENTRANCE ONLY INTERNAL PROPERTYLINES ARE CONCEPTUALIN NATURE BUILDING 9677,160 SF570' x 1,188' 185' TRUCK COURT WITH +/-80 TRAILERSPACES 185' TRUCK COURT WITH +/-88 TRAILERSPACES 0.80 ACESTIMATEDDETENTIONPOND 2.46 ACESTIMATEDDETENTIONPOND 1.81 ACDETENTIONPOND 1.56 ACDETENTIONPOND CLASS 1 LANDSCAPEBUFFER (30' FROM R/W)FRONT SETBACK (20' FROM R/W) 7' SIDE SETBACK 30' CLASS 1LANDSCAPE BUFFER 10' REAR SETBACK30' CLASS 1 LANDSCAPE BUFFER7' SIDE SETBACK 40' CLASS 2 LANDSCAPE BUFFER20' FRONT SETBACK 40' CLASS 2 LANDSCAPE BUFFER EXISTING FLOODPLAIN 30' CLASS 1 LANDSCAPEBUFFER 30' CLASS 1 LANDSCAPE BUFFER 25' CLASS 5 LANDSCAPE BUFFER 45454545 4545 4545454545454545454545454545454545454545454545454545454545454545 GREENVILLE-PICKENS SPEEDWAY NOTE: THIS PLAN IS CONCEPTUAL IN NATURE AND SUBJECT TO CHANGESPEEDWAY MULTI USE PARKPHASE 2PICKENS COUNTY, SC11/10/2024 PLOTTED:11/11/2024 9:19 AM, BY Benjamin Withrow P:\ACAD-D-3\10066\CAD Files\Exhibits\Land Use - PC\Speedway Indsutrial Master Plan Ph2 - Planning Commission.dwg 0SCALE: 1" = 200'100200400SEWN PHASE 1 MULTI-USE PARK.APPROVAL NO.: LU-24-0004 GENERAL INFORMATIONTMS # = 5049-12-95-1720; 5049-12-97-4069; 5049-08-97-5822;5049-08-87-9745; 5049-08-98-2239; 5049-08-88-4098; 5049-12-86-3788;5049-12-76-6183; 5049-12-85-7235TOTAL LOT AREA = 289 ACBUILDING 7, 8, AND 9 LOT AREA = 121 ACBUILDING 10 LOT AREA = 32 ACTOTAL BUILDING LOT AREA = 153 ACZONING = GENERAL DEVELOPMENT DISTRICTSETBACKS: FRONT = 20 LF SIDE = 7 LF REAR = 10 LFBUFFERYARD: AS NOTEDMAX DENSITY: 0.75 FAR x 289 AC x 43,560 SQFT = 9,441,630 SQFTBUILDING AREA = ±2,900,000 SQFTFLOOD ZONE : ZONE X/AE PROPOSED PHASE 2MULTI-USE PARK LU-24-0010: GP Speedway Multi-Use Park Phase 2 Staff Report Planning Commission Public Hearing: January 13, 2025 6:30 PM The following report constitutes an assessment and evaluation by Planning Staff on the above mentioned request. Applicant: SC Speedway Hwy 124, LLC 201 Riverplace, Ste 400 Greenville, SC 29601 Property Owner(s): SC Speedway Hwy 124, LLC Property Location: 3800 Calhoun Memorial Highway Acreage: 153 Tax Map Numbers: 5049-12-95-1720; 5049-12-86-3788; 5049- 12-97-4069; 5049-12-88-7235; 5049-12- 76-6183; 5049-08-97-5822; 5049-18-87- 9745; 5049-08-88-4098; 5049-08-98-2239 County Council District 6 Land Use Request: Creation of a Multi-Use Park. Variance Request(s) from Planning Commission: None Request Overview: This is Phase 2 of the proposal to transform the Greenville Pickens Speedway and its surrounding area into a Multi-Use Park. In this phase, four new buildings will be constructed totaling 2,900,000 square feet. The total area of the site is 153 acres. The current site plan indicates that the racetrack will remain intact, with a temporary site entrance located off SC Hwy 124 to the east of the track. Current Property Use: The properties are listed on the Assessor’s site as a combination of commercial, residential, and vacant Surrounding Area: The area to the west is mostly residential, the area to the north is bordered by Southern Railway and mostly vacant land, to the east is vacant land, and to the south is SC Hwy 123 and SC Hwy 124 and commercial uses. Utilities & Infrastructure Transportation: The property is proposed to be served by SC Hwy 124, which is a state-maintained roadway. Water: Properties to be serviced by Powdersville Water Sewerage: Properties to be serviced by Easley Combined Utilities. Property Development History: This property appears to have been commercial for as far back as 1966. Comments from Reviewing Agencies: SCDOT: Has issued a encroachment approval for phase 1 Pickens County Engineer: Has been in contact about the project via email communication. Schools: N/A Storm Water: Storm Water Permit will be required. Staff Analysis of Standards for Land Use Approval: Staff analysis of the application is made based upon the findings criteria as set forth in Section 1205(f) of the UDSO. The applicant has submitted his/her response to the same findings criteria. A. Is the proposed use consistent with other uses in the area or the general development patterns occurring in the area? The proposed use, if developed according to existing County standards and according to the applicant’s submitted proposal, will be consistent with the majority of uses in the immediate area and the direction set by the Comprehensive Plan. B. Will the proposed use adversely affect the existing use or usability of adjacent or nearby property? With strict adherence to the development standards for the proposed uses, the proposed use should not adversely affect the existing use of adjacent property. C. Is the proposed use compatible with the goals, objectives, purpose and intent of the Comprehensive Plan? The proposed use is consistent with the adopted Future Land Use/Character Area map of the Comprehensive Plan. The Character Area designation for the area is Commercial Gateway Corridor. D. Will the proposed use not cause an excessive or burdensome use of public facilities or services, including but not limited to streets, schools, water or sewer utilities, and police or fire protection? If developed according to adopted development standards, the project should not cause a burden on existing facilities or services. E. Is the property suitable for the proposed use relative to the requirements set forth in this development ordinance such as off -street parking, setbacks, buffers, and access? Yes. The applicant’s proposal before the Commission will meet the respective standards as set forth in the Unified Development Standards Ordinance of Pickens County. F. Does the proposed use reflect a reasonable balance between the promotion of the public health, safety, morality, or general welfare and the right to unrestricted use of property? As proposed by the applicant and as outlined in the UDSO the proposed development of the property in question should provide for a reasonable balance between the promotion of public health, safety, morality, or general welfare and the right to unrestricted use of property. General Requirements for A Large Project: Sec. 309 Large Scale Projects. 309 (a) Purpose. Large-scale projects can substantially impact environmental features, surrounding land use, traffic conditions and facilities, and public utilities. The purposes of this section, therefore, are to assure the proper siting of such projects in relation to th eir surroundings, and to avoid any negative impacts from improper planning and design. 309 (b) Definition. For purposes of this section, a large-scale project is defined as follows: (1) Any project that is capable of generating 1,000 average daily vehicle trips or more. Anticipated vehicle trips will be based upon the most current edition of Trip Generation published by the Institute of Transportation Engineers. (2) A truck or bus terminal, including service facilities designed principally for such uses. (3) Outdoor sports or similar recreational facilities that encompass one (1) or more total acres in parking and facilities. 309 (c) Site Access Requirements. (1) External Road Configurations a. Road systems serving large scale projects shall be designed in relation to existing and planned external systems. b. To ensure proper location of vehicular access points along existing collector and arterial County roads, the SCDOT Access and Roadside Management Standards, as amended, shall be adhered to in providing for vehicular access to all collector and arterial streets. Principal vehicular access points shall be designed to encourage smooth traffic flow with controlled turning movement and minimize hazards to vehicular and pedestrian traffic. Merging and turning lanes and/or traffic dividers shall be required where existing or anticipated heavy flows indicate need. c. Such projects shall not be permit- ted access to a local residential street, but may border or front on a local commercial or industrial street. Where a large scale project is adjacent to more than one street, access shall be taken from the lower classification of street permitted, where feasible. d. Access for pedestrians and shall be by safe and convenient routes. Such access need not be adjacent to or limited to the vicinity of access points for automotive vehicles. Where there are crossings of pedestrian ways and vehicular routes at edges of projects, such crossings shall be safely located, marked and controlled and where such ways are exposed to substantial automotive traffic at edges of the district, safeguards including fencing may be required to prevent crossing except at designed points. e. More specifically, ingress, egress openings in concrete, asphalt, rock or other street curbing provisions, commonly referred to as "curb cuts", as well as other means of vehicular access to and from such projects shall be in accordance with the following requirements. (1) Access points to large -scale projects shall consist of two twelve (12) foot exit lanes and a twenty (20) foot entrance lane. A twenty-five (25) foot turning radius space will be provided and one hundred (100) feet of right - of-way where entrance/exit fronts with the intersecting street. Entrances and exits may not take access closer than one hundred twenty -five (125) feet from the right-of-way line of an intersecting major local or collector street and one hundred fifty (150) feet from an intersecting arterial street. (2) In no case shall any point of access or other means of vehicular ingress and egress from private property onto a public street be permitted closer than two hundred (200) feet to the intersecting point of that street's right-of- way line with the right -of-way of any portion of an interchange involving grade separations with that road and any limited access high - ways, said interchange to include all portions of all ramps, accelerating and decelerating lanes, merge lanes and other facilities specifically d e- signed to facilitate traffic movement onto and off of the limited access highway. (3) Where possible, entrances shall be located in a manner to allow at least one hundred (100) feet of sight distance for each ten (10) miles per hour of speed limit. Sight distance shall be measured from a seeing height of three and one-half (3.5) feet to an object one foot in height. (4) A fifteen (15) foot sight easement triangle shall be reserved by the developer and dedicated to Pickens County with the recording of the final plat. The sight easement shall be shown on the final plat before it is recorded. (2) Internal Road Configurations a. Streets, drives, and parking and service areas shall provide safe and convenient access to dwelling units and general facilities and for service and emergency vehicles. Streets shall be laid out so as not to encourage outside traffic to traverse the development on minor streets, not occupy more land than is required to provide access as indicated, or create unnecessary fragmentation of the project into small blocks. In general, the project shall be consistent with use and shape of the site and the convenience and safety of occupants and persons frequenting the project. b. Vehicular access to collector and arterial streets or portions of streets from off - street parking and service areas shall be so combined, limited, located, designed, and controlled as to channel traffic to and from such areas conveniently, safely, and in a manner that minimizes traffic friction and promotes free flow of traffic on streets without excessive interruptions. To this end, the SCDOT Access and Roadside Management Standards, as amended, shall be adhered to in providing for vehicular access to all collector and arterial streets. Planning Staff Comments: Planning staff has communicated with the applicant. The site plan meets the standards of the Unified Development Standards Ordinance. Planning staff recommends the project's approval. Pickens County, SC Developed by Parcel ID    5049-12-86-3788 Account No   R0096778 Property Address    District G10-Georges Creek/Crosswell Brief Tax Description  N/SIDE CROSSWELL SCHOOL RD, SE/SIDE LATHEM RD PLAT 559/10 PLAT 597/129 PLAT 610/56 PLAT 610/51 PLA (Note: Not to be used on legal documents) Account Type   Vacant Land Class   n/a Acreage   41.2 LEA Code   0011 Value   $0 Ownership   WHITAKER KEVIN 615 ROPER MOUNTAIN RD GREENVILLE, SC 29615 Documents Date   Price   Doc   Vacant or Improved   n/a   $    /    n/a   n/a   $    /    n/a   Date created: 12/18/2024 Last Data Uploaded: 12/17/2024 8:24:56 PM 1,180 ft Overview Legend Parcels 911 Address Roads 61 CHAPTER 5 | LAND USE DRAFT | APRIL 2022 Character Areas Recreation and Open Space Community Commercial Center Agricultural Preservation Commercial Gateway CorridorRural Places Workplace Centers Residential Growth Institutional and Educational Urban Residential SR 11 Scenic Corridor Neighborhood Commercial Center January 2025 LU-24-0011 Phase 3 Speedway Multi-Use Park ADDENDUM TO THE APPLICATION FOR LAND USE REVIEW/SUBDIVISION REVIEW APPLICATIONS FOR LAND USE AND SUBDIVISION REVIEW HEARINGS PICKENS COUNTY, SOUTH CAROLINA APPLICANT: SC SPEEDWAY HWY 124, LLC PROPERTY OWNER: ESTATE OF FRANCES L. MERCER, BY AND THROUGH HER PERSONAL REPRESENTATIVE ELIZABETH LARK MERCER HUNTER SIGNATURE PAGE ESTATE OF FRANCES L. MERCER - OWNER OF THE FOLLOWING PARCEL: Tax Map Number 5049-08-98-2239 consisting of approximately 12.9 acres ESTATE OF FRANCES L. MERCER Name: Elizabeth Lark Mercer Hunter Title: Personal Representative of the Estate of Frances L. Mercer Date: August 22 2024 Judson Mills Bldg 6000, Ste 6060, 701 Easley Bridge Rd, Greenville, SC 29611 (864) 298-0534 | SeamonWhiteside.com Mount Pleasant | Greenville | Summerville | Spartanburg | Charlotte Elevating the site design experience. Seamon Whiteside & Associates, Inc 701 Easley Bridge Road, Ste. 6060 Greenville SC, 29611 November 11, 2024 Pickens County Planning Department 222 McDaniel Avenue, B-10 Pickens, SC 29671 Letter of Intent Dear Trad, This letter is to inform you of the necessary information regarding the land use development. The property in question is to be used for an industrial park. Approximately 110 AC of the total 289 AC are being disturbed in the initial phase. 19 existing lots have been consolidated into five (5) lots. Six (6) buildings were approved for the multi-use commercial park per approval number LU-24-0004. Phase 3 will disturb approximately 33 AC of the total 289 AC, and will not divide the existing parcel. Within that parcel, nine (9) additional buildings will be constructed, comprising a total of no more than 800,000 SF. Your expeditious review is greatly appreciated. Ple ase contact me via phone at 843-333-5962 or email at rhall@seamonwhiteside.com if you have any questions or need further clarification for this project. Seamon Whiteside and Associates, Inc. Ryan Hall, P.E. Civil Engineering Director OUTPARCELPONDOUTPARCEL 5+/- 1.7 ACRES INDUSTRIAL 1120' x 500'60,000 SFINDUSTRIAL 2120' x 500'60,000 SFINDUSTRIAL 3120' x 632'75,840 SF INDUSTRIAL 3POND INDUSTRIAL 1+2POND OUTPARCELWET POND ALTERNATE OUTPARCEL ROADOUTPARCEL 6+/- 2.7 ACRES 124 123 BUILDING 1267,840 SF310' x 864'FFE ±908 CROSWELL SCHOOL ROAD PHASE 1 ACCESS(TRUCK ACCESS) 1.56 ACDETENTIONPOND CLASS 1 LANDSCAPEBUFFER (30' FROM R/W)FRONT SETBACK (20' FROM R/W)4545454545454545 45454545 45 45454545454545454545454545454545454545454545454545 NOTE: THIS PLAN IS CONCEPTUAL IN NATURE AND SUBJECT TO CHANGE PLOTTED:11/11/2024 1:34 PM, BY Austin Horvat P:\ACAD-D-3\10066\CAD Files\Exhibits\Land Use - PC\Speedway Indsutrial Master Plan Ph3 - Planning Commission.dwg SCALE: 1" = 100'050100200SEWN PHASE 1 MULTI-USE PARK.APPROVAL NO.: LU-24-0004GENERAL INFORMATIONTMS # = 5049-16-94-6647TOTAL LOT AREA = 289 ACEXISTING SPEEDWAY LOT AREA = 33 ACTOTAL BUILDING LOT AREA = 33 ACZONING = GENERAL DEVELOPMENT DISTRICTSETBACKS: FRONT = 20 LF SIDE = 7 LF REAR = 10 LFBUFFERYARD: AS NOTEDMAX DENSITY: 0.75 FAR x 33 AC x 43,560 SQFT = 1,078,110 SQFTBUILDING AREA = ±300,000 SQFTFLOOD ZONE : ZONE X/AE PROPOSED PHASE 3MULTI-USE PARK SPEEDWAY MULTI USE PARKPHASE 3PICKENS COUNTY, SC11/10/2024 OUTPARCEL 2 +/-3.86 AC WB-67 - Interstate Semi-Trailer WB-67 - Interstate Semi-Trailer WB-67 - Interstate Semi-Trailer WB-67 - Interstate Semi-Trailer 10 9 9 10 9 10 10 10 10 10 10 8 8 7 5 10 10 10 PROPOSED INTERSECTION PROPOSED INTERSECTION POSSIBLE NEW ROW 20' SETBACK FROM NEW ROW 46 34 11 20 9 46 27 158 8,000 GAL PUL 12,000 GAL DSL 20,000 GAL RUL 20,000 GAL/6,000 GAL DSL DEF 20,000 GAL DSL HIGHWAY 123 OUTPARCEL 1 +/- 3.3 AC OUTPARCEL 2 +/- 2.2 ACRES OUTPARCEL 3 +/- 2.9 ACRES OUTPARCEL 4 +/- 3.3 ACRES [gas station] BUILDING 1 BUILDING 12 HIGHWAY 123 POND PEDESTRIAN SIDEWALK & LANDSCAPE MONUMENT BOULEVARD + FLAGS OUTPARCEL 6 +/ - 23.33 ACRES THE LINE SHOWN ABOVE IS EXACTLY ONE INCH LONG AT THIS SHEETS ORIGINAL PAGE SIZE LS3P PROJECT: ORIG SUBMISSION: NOT FOR CONSTR UCT ION SHEET NAME: SHEET: A B C D E 1 2 3 4 5 6 DATE DESCRIPTION ∆ COPYRIGHT 2023 ALL RIGHTS RESERVED. PRINTED OR ELECTRONIC DRAWINGS AND DOCUMENTATION MAY NOT BE REPRODUCED IN ANY FORM WITHOUT WRITTEN PERMISSION FROM LS3P ASSOCIATES LTD. 11/27/2024 9:52:23 AM A-100.5f OPTION 5 - INDUSTRIAL PARCEL 2 3154-240344 10/07/24 Realty Link Calhoun Memorial Hwy Easley, South Carolina 29640 Greenville-Pickens Speedway Concept Plan PROGRESS WWW.LS3P.COM 2 WEST WASHINGTON STREET STE 600 GREENVILLE, SOUTH CAROLINA 29601 TEL. 864.235.0405 FAX. 864.233.4027 LU-24-0011: GP Speedway Multi-Use Park Staff Report Planning Commission Public Hearing: January 13, 2025 6:30 PM The following report constitutes an assessment and evaluation by Planning Staff on the above mentioned request. Applicant: SC Speedway Hwy 124, LLC 201 Riverplace, Ste 400 Greenville, SC 29601 Property Owner(s): SC Speedway Hwy 124, LLC Property Location: 3800 Calhoun Memorial Highway Acreage: 33 Tax Map Numbers: 5049-16-94-6647 County Council District 6 Land Use Request: Creation of a Multi-Use Park. Variance Request(s) from Planning Commission: None Request Overview: This is phase 3 of the proposal to transform the Greenville Pickens Speedway and its surrounding area into a Multi-Use Park. Nine buildings will be constructed, covering a total of 800,000 square feet. The entire site spans 33 acres. This site plan indicates that this ph ase will be developed over the racetrack, with the site entrance relocated to SC Hwy 123. Current Property Use: The property is listed on the Assessor site as commercial. Surrounding Area: The area to the west is mostly residential, the area to the north is bordered by Southern Railway and mostly vacant land, to the east is vacant land, and to the south is SC Hwy 123 and SC Hwy 124 and commercial uses. Utilities & Infrastructure Transportation: The property is proposed to be served by SC Hwy 123, which is a state-maintained roadway. Water: Properties to be serviced by Powdersville Water Sewerage: Properties to be serviced by Easley Combined Utilities. Property Development History: This property appears to have been commercial for as far back as 1965. Comments from Reviewing Agencies: SCDOT: Has issued an encroachment approval for phase 1 Pickens County Engineer: Has been in contact about the project via email communication. Schools: N/A Storm Water: The site plan is currently under review. Staff Analysis of Standards for Land Use Approval: Staff analysis of the application is made based upon the findings criteria as set forth in Section 1205(f) of the UDSO. The applicant has submitted his/her response to the same findings criteria. A. Is the proposed use consistent with other uses in the area or the general development patterns occurring in the area? The proposed use, if developed according to existing County standards and according to the applicant’s submitted proposal, will be consistent with the majority of uses in the immediate area and the direction set by the Comp Plan. B. Will the proposed use adversely affect the existing use or usability of adjacent or nearby property? With strict adherence to the development standards for the proposed uses, the proposed use should not adversely affect the existing use of adjacent property. C. Is the proposed use compatible with the goals, objectives, purpose and intent of the Comprehensive Plan? The proposed use is consistent with the adopted Future Land Use/Character Area map of the Comprehensive Plan. The Character Area designation for the area is Commercial Gateway Corridor. D. Will the proposed use not cause an excessive or burdensome use of public facilities or services, including but not limited to streets, schools, water or sewer utilities, and police or fire protection? If developed according to adopted development standards, the project should not cause a burden on existing facilities or services. E. Is the property suitable for the proposed use relative to the requirements set forth in this development ordinance such as off -street parking, setbacks, buffers, and access? Yes. The applicant’s proposal before the Commission will meet the respective standards as set forth in the Unified Development Standards Ordinance of Pickens County. F. Does the proposed use reflect a reasonable balance between the promotion of the public health, safety, morality, or general welfare and the right to unrestricted use of property? As proposed by the applicant and as outlined in the UDSO the proposed development of the property in question should provide for a reasonable balance between the promotion of public health, safety, morality, or general welfare and the right to unrestricted use of property. General Requirements for A Large Project: Sec. 309 Large Scale Projects. 309 (a) Purpose. Large-scale projects can substantially impact environmental features, surrounding land use, traffic conditions and facilities, and public utilities. The purposes of this section, therefore, are to assure the proper siting of such projects in relation to th eir surroundings, and to avoid any negative impacts from improper planning and design. 309 (b) Definition. For purposes of this section, a large-scale project is defined as follows: (1) Any project that is capable of generating 1,000 average daily vehicle trips or more. Anticipated vehicle trips will be based upon the most current edition of Trip Generation published by the Institute of Transportation Engineers. (2) A truck or bus terminal, including service facilities designed principally for such uses. (3) Outdoor sports or similar recreational facilities that encompass one (1) or more total acres in parking and facilities. 309 (c) Site Access Requirements. (1) External Road Configurations a. Road systems serving large scale projects shall be designed in relation to existing and planned external systems. b. To ensure proper location of vehicular access points along existing collector and arterial County roads, the SCDOT Access and Roadside Management Standards, as amended, shall be adhered to in providing for vehicular access to all collector and arterial streets. Principal vehicular access points shall be designed to encourage smooth traffic flow with controlled turning movement and minimize hazards to vehicular and pedestrian traffic. Merging and turning lanes and/or traffic dividers shall be required where existing or anticipated heavy flows indicate need. c. Such projects shall not be permit- ted access to a local residential street, but may border or front on a local commercial or industrial street. Where a large scale project is adjacent to more than one street, access shall be taken from the lower classification of street permitted, where feasible. d. Access for pedestrians and shall be by safe and convenient routes. Such access need not be adjacent to or limited to the vicinity of access points for automotive vehicles. Where there are crossings of pedestrian ways and vehicular routes at edges of projects, such crossings shall be safely located, marked and controlled and where such ways are exposed to substantial automotive traffic at edges of the district, safeguards including fencing may be required to prevent crossing except at designed points. e. More specifically, ingress, egress openings in concrete, asphalt, rock or other street curbing provisions, commonly referred to as "curb cuts", as well as other means of vehicular access to and from such projects shall be in accordance with the following requirements. (1) Access points to large -scale projects shall consist of two twelve (12) foot exit lanes and a twenty (20) foot entrance lane. A twenty-five (25) foot turning radius space will be provided and one hundred (100) feet of right - of-way where entrance/exit fronts with the intersecting street. Entrances and exits may not take access closer than one hundred twenty -five (125) feet from the right-of-way line of an intersecting major local or collector street and one hundred fifty (150) feet from an intersecting arterial street. (2) In no case shall any point of access or other means of vehicular ingress and egress from private property onto a public street be permitted closer than two hundred (200) feet to the intersecting point of that street's right-of- way line with the right -of-way of any portion of an interchange involving grade separations with that road and any limited access high - ways, said interchange to include all portions of all ramps, accelerating and decelerating lanes, merge lanes and other facilities specifically d e- signed to facilitate traffic movement onto and off of the limited access highway. (3) Where possible, entrances shall be located in a manner to allow at least one hundred (100) feet of sight distance for each ten (10) miles per hour of speed limit. Sight distance shall be measured from a seeing height of three and one-half (3.5) feet to an object one foot in height. (4) A fifteen (15) foot sight easement triangle shall be reserved by the developer and dedicated to Pickens County with the recording of the final plat. The sight easement shall be shown on the final plat before it is recorded. (2) Internal Road Configurations a. Streets, drives, and parking and service areas shall provide safe and convenient access to dwelling units and general facilities and for service and emergency vehicles. Streets shall be laid out so as not to encourage outside traffic to traverse the development on minor streets, not occupy more land than is required to provide access as indicated, or create unnecessary fragmentation of the project into small blocks. In general, the project shall be consistent with use and shape of the site and the convenience and safety of occupants and persons frequenting the project. b. Vehicular access to collector and arterial streets or portions of streets from off-street parking and service areas shall be so combined, limited, located, designed, and controlled as to channel traffic to and from such areas conveniently, safely, and i n a manner that minimizes traffic friction and promotes free flow of traffic on streets without excessive interruptions. To this end, the SCDOT Access and Roadside Management Standards, as amended, shall be adhered to in providing for vehicular access to all collector and arterial streets. Planning Staff Comments: Planning staff has been in contact with the applicant. The site plan complies with the Unified Development Standards Ordinance. Planning staff recommends approval of the project. Pickens County, SC Developed by Parcel ID    5049-16-94-6647 Account No   R0096776 Property Address    3800 CALHOUN MEM HWY EASLEY District G10-Georges Creek/Crosswell Brief Tax Description  HWY 123 AT CROSWELL SCHOOL RD, PLAT 620/78 TR 3B (Note: Not to be used on legal documents) Account Type   Commercial Class   Stadiums *CODE Acreage   33.4 LEA Code   0010 Value   $0 Ownership   RACETRACK LLC C/O KEVIN WHITAKER PO BOX 6628 GREENVILLE, SC 29615 Documents Date   Price   Doc   Vacant or Improved   n/a   $    /    n/a   n/a   $    /    n/a   Date created: 12/18/2024 Last Data Uploaded: 12/17/2024 8:24:56 PM 590 ft Overview Legend Parcels 911 Address Roads 61 CHAPTER 5 | LAND USE DRAFT | APRIL 2022 Character Areas Recreation and Open Space Community Commercial Center Agricultural Preservation Commercial Gateway CorridorRural Places Workplace Centers Residential Growth Institutional and Educational Urban Residential SR 11 Scenic Corridor Neighborhood Commercial Center

Source: Pickens County website. First collected Nov 7, 2026.