January 2025
LU-24-0009
Hagan RV Park
www.sitedesign-inc.com 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PH: (864) 271-0496
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS©
EASLEYPICKENS COUNTYSOUTH CAROLINA
RECREATIONAL VEHICLE (RV) PARKS & CAMPGROUND SITE NOTES(PER PICKENS COUNTY):1.NO SITE SHALL BE USED AS A PERMANENT RESIDENCE AND SHALL ONLY BE FOR THE USE OFTRAVEL TRAILERS, PICKUP CAMPERS, COACHES, MOTOR HOMES, CAMPING TRAILERS, OTHERVEHICLE ACCOMMODATIONS, TENTS, PARK MODEL UNITS, AND ON-SITE RENTAL CABINS. NOSITE MAY BE USED FOR MORE THAN ONE HUNDRED EIGHTY (180) DAYS IN ANY CALENDAR YEARBY THE SAME OCCUPANT.2.SITES MAY BE SERVED BY ON-SITE SEWAGE DISPOSAL SYSTEMS AS PERMITTED BY SCDHEC;HOWEVER, EACH INDIVIDUAL SITE MAY NOT BE SERVED WITH AN INDIVIDUAL SYSTEM.3.SITES WITHIN THE PARK THAT ARE NOT OTHERWISE SERVED WITH SEWAGE DISPOSALCONNECTION, AN ONSITE BATH HOUSE (PROVISIONS FOR RESTROOM AND BATHING FACILITIES)MUST BE PROVIDED.4.SITES SHALL NOT BE SERVED BY INDIVIDUALLY METERED POWER OR WATER SERVICE. WHENMULTIPLE SITES ARE BEING PROVIDED, MASTER METER(S) MUST PROVIDE SERVICE TO THEENTIRE PARK. ALL SITES MUST HAVE ACCESS TO PUBLIC WATER, EITHER DIRECTLY ORCOMMUNALLY.
RIGHT AND LEFT IN,RIGHT OUT DRIVEWAY
SEPTICFIELD
STORMWATERPOND
GRASSYOPEN AREA
CAMPER PAD(20'X50' TYP = 1,000 SF)
OFFICE ANDAMENITY AREA WITHSTORM SHELTERPULL THOUGHCAMPER PAD(20'X50' TYP)
PROPERTY LINE
HAYWOOD RD R/W LINE
PULL OFF AREAFOR CHECK-IN
HAYWOOD RD.
TRIBUTARY TO GOLDENCREEK CENTERLINEJEFFREY & TERESA HAGAN341 HAYWWOD ROAD36.244 ACRES(INCLUDES ANY & ALL R/W)
SITE DENSITY CALCULATIONS:CAMP GROUND - 4 SITES PER ACRE (36.24 ACRES X 4 SITES/ACRE = 144 SITES ALLOWABLE)REGULAR SITES PROVIDED:21SPACESHC SITES PROVIDED:1SPACESTOTAL SITES PROVIDED:22SPACESNOTE:1.A MINIMUM OF ONE (1) SITE MUST BE ADA ACCESSIBLE2.ALL SITES MUST BE A MINIMUM OF 690 SQ FT AND HAVE A STABILIZED AND COMPACTEDVEHICULAR PARKING PAD OF PACKED GRAVEL, PAVING, OR OTHER SUITABLE MATERIAL.
8910
7654
321
19
18
17
22
21
20
111213141516
100' SIDE SETBACK
20' FRONTSETBACK FROMR/W LINE
100.0'
24.0'
24.0'24.0'
PROPOSEDPROPERTY LINE
PROPOSEDPROPERTY LINE
SITE DATASITE ADDRESS341 HAYWOOD ROADEASLEY, SC 29640OWNER/DEVELOPERJEFFREY & TERESA HAGANPROPOSED USERV PARKTAX MAP #R0014942PARCEL AREA8.34 ACRESSETBACKSFRONT: 20'SIDES: 100'REAR: 100'
GRAVEL ROADS
GRAVELROADS
LU-24-0009: Hagan RV Park.
Staff Report
Planning Commission Public Hearing: January 13, 2025 6:30 PM
The following report constitutes an assessment and evaluation by Planning staff on the above
mentioned request.
Applicant: Teresa Hagan
341 Haywood Rd.
Easley, SC 29640
Property Owner(s): Teresa & Jeffrey Hagan
Property Location: 341 Haywood Rd. Easley, SC 29640
Acreage: 6 acres
Tax Map Number: 5009-18-32-2122
County Council District: 4
Land Use Request: LU-24-0009: The Land Use request is for a twenty two site RV park off of Haywood
Rd.
Variance Request(s) from Planning Commission: None
Request Overview:
The proposed RV park consists of twenty-two sites, utilizing approximately 6 acres of the
36.24-acre parcel. Access to the RV park will be from Haywood Road, which is maintained
by SCDOT.
Current Property Use:
The property is listed on the Assess or’s s ite as residential and shows as such in the aerial
photographs.
Surrounding Area:
The parcel is surrounded by residential areas to the North, East, and West. The South of the
property appears to be vacant land.
Utilities & Infrastructure
Transportation: The property is served by Haywood Road.
Emergency Services: Request a fire hydrant at the entrance.
Stormwater: Will require Stormwater permit.
Water: public water (Easley Combined)
Sewerage: Onsite Septic
Comments from Reviewing Agencies:
Staff Analysis of Standards for Land Use Approval:
Staff analysis of the application is made based upon the findings criteria as set forth in
Section 1205(f) of the UDSO. The applicant has submitted his/her response to the same
findings criteria.
A. Is the proposed use consistent with other uses in the area or the general
development patterns occurring in the area?
The proposed use is not consistent with uses in the immediate area or the general
development patterns in the area.
B. Will the proposed use adversely affect the existing use or usability of adjacent or
nearby property?
With strict adherence to the development standards for the proposed uses, the
proposed use should not adversely affect the existing use of adjacent property.
C. Is the proposed use compatible with the goals, objectives, purpose , and intent of
the Comprehensive Plan?
The proposed use is not consistent with the Comprehensive Plan as it
designates the area for Workplace Centers.
D. Will the proposed use not cause an excessive or burdensome use of public facilities
or services, including but not limited to streets, schools, water or sewer utilities,
and police or fire protection?
If developed according to the County development standards, the project
should not burden existing facilities or services.
E. Is the property suitable for the proposed use relative to the requirements set forth
in this development ordinance such as off -street parking, setbacks, buffers, and
access?
The applicant’s proposal before the Commission will meet the respective
standards as outlined in the Unified Development Standards Ordinance of
Pickens County.
F. Does the proposed use reflect a reasonable balance between the promotion of the
public health, safety, morality, or general welfare and the right to unrestricted use
of property?
The proposed development should provide for a balance of competing interests.
Sec. 302 Recreational Vehicle (RV) Parks and Campgrounds.
302 (a) Purpose.
The purpose of this section is to provide opportunities for quality
developed campgrounds and recreational vehicle parks that are
properly sited where there is adequate public street access and
adequate access to other public services which may be needed b y such
endeavor. In order to create a desirable and successful recreation
environment while protecting the public health, safety, and welfare,
Planning Commission review and consideration will be required;
unless exempted in the following sections. Two or more RVs on one
single parcel constitutes an RV Park.
302 (b) Use Standards.
(1) Each park or campground must have direct frontage and access to
a collector or arterial street. Access to each individual site and other
provided structures shall be from internal/private roads. Individual
sites shall not be accessed directly from a public road.
1a. Roadways within an RV Park or Campground shall be
constructed to all-weather standards: graveled road or road of
equivalent materials that is passable by vehicles under both wet
and dry weather conditions.
1b. All roadways shall have a minimum travel width of twelve
feet (12”) for single lane travel and twenty -four feet (24”) for
two lane travel, and a thirty -five foot (35”) turning radius
required on all curves to allow access by emergency vehicles.
(2) RV parks and campgrounds must be a minimum of five (5)-acres in
size and shall not exceed ten (10)-acres in the Appalachian, Agricultural, and
Natural Heritage Areas and must be a minimum of five (5) -acres in the
Community Center and Gateway Areas.
(3) No site shall be used as a permanent residence and shall only be for
the use of travel trailers, pickup campers, coaches, motor homes, camping
trailers, other vehicular accommodations, tents, park model units, and on-site
rental cabins. No site may be used for more than one hundred eighty (180)
days in any calendar year by the same occupant.
(4) Overall density of the park or campground shall be limited to no
more than four (4) sites per acre.
(5) Minimum Space Size. A minimum net space of 690 square feet is
required for each RV space.
(6) Setbacks. RV Parks shall maintain a minimum setback of 100 feet
rom all property lines.
(7) Sites may be served by on-site sewage disposal system as permitted
by SCDHEC; however, each individual site may not be served with an
individual system.
(8) For sites within the park that are not otherwise served with sewage
disposal connections, an onsite bath house (provisions for restroom and
bathing facilities) must be provided.
(9) Sites shall not be served by individually metered power or water
service. When multiple sites are being provided, master meter(s) must provide
service to the entire park. All sites must have access to public water, either
directly or communally.
(10) For parks with more than four (4) sites a storm shelter shall be
provided per IRC standards.
(11) At the time of application for land use approval, RV parks and
campgrounds must include a proper site management plan to be instituted
once operational.
(12) 911 Adressing is required for all RV parks and campgrounds.
(13) Buffers. RV parks are subject to a Class ll Buffer (see Figure 8.2,
Section 812
(14) Minimum Separation Between Recreational Vehicles.
1. A distance of a least 10 feet shall be maintained between
recreational vehicles.
2. For the purpose of this requirement, accessory structures and
accessories attached to an RV are considered a part of the
recreational vehicle.
Planning Staff Recommendation:
The site plan will comply with the new standards approved by the County Council on November
4, 2024. Staff has informed the applicant that there is a 100 -foot setback requirement from all
property lines, and a Class 2 buffer must be maintained within this setback area. The applicant
has been asked by staff to clearly indicate the Class 2 buffer on the site plan.
61
CHAPTER 5 | LAND USE
DRAFT | APRIL 2022
Character Areas
Recreation and Open Space Community
Commercial Center
Agricultural Preservation Commercial
Gateway CorridorRural Places
Workplace Centers
Residential Growth
Institutional and
Educational
Urban Residential
SR 11 Scenic Corridor
Neighborhood
Commercial Center
Pickens County, SC
Developed by
Parcel ID 5009-18-32-2122
Account No R0014942
Property
Address
341 HAYWOOD RD
EASLEY
District A09-Easley
Brief
Tax Description
S/SIDE HIGHLAND RD EXT.,
PLAT 612/313
(Note: Not to be used on
legal documents)
Account
Type
Residential
Class 1 Story
Acreage 36.244
LEA
Code
0008.7
Value $81,387
Ownership HAGAN
JEFFREY W
341
HAYWOOD
RD
EASLEY, SC
29640-0000
Documents
Date Price Doc Vacant or
Improved
2/24/2021 $385,000 2247/ / 214 Improved
2/12/2021 $0 612 / 313 Improved
Date created: 12/2/2024
Last Data Uploaded: 12/2/2024 8:30:07 PM
590 ft
Overview
Legend
Parcels
911 Address
Roads
January 2025
SDV-24-0003
Subdivision Variance
April Valley Ln
SDV-24-0003: Subdivision Variance April Valley Lane
Staff Report
Planning Commission Public Hearing: January 13, 2025 6:30 PM
The following report constitutes an assessment and evaluation by Planning staff on the above
mentioned request.
Applicant: Scott & Shannon Patterson
112 Woodstone Drive
Easley, SC 29642
Property Owner(s): Scott Patterson
Property Location: 300 & 304 April Valley Lane, Pickens SC 29671
Acreage: 4
Tax Map Number: 5101-00-89-0912
County Council District: 3
Land Use Request: SDV-24-0003:
Variance Request(s) from Planning Commission: The applicant is requesting a variance from
Article 10 Sec. 1012 (c) Private Road standards of the Unified Development Standards
Ordinance.
Request Overview:
This is a request to subdivide the properties at 300 April Valley Lane and 304 April Valley Lane
into two separate two-acre lots for individual residences. The remaining area of 15.474 acres will
be kept as vacant land. April Valley Lane is a private road that connects to Jameson Road, which
is a state road.
Current Property Use:
The property is currently listed on the Assessor’s site as vacant land. The property is also denoted
on the Assessor’s map with the two addresses of 300 and 304 April Valley Lane.
Surrounding Area:
The parcel is surrounded by residential areas to the West. April Valley RV Park is located to the
South of the parcel. The North and East sides of the property appear to be vacant land.
Utilities & Infrastructure
Transportation: The property is served by April Valley Lane, which is a private road.
Water: Public Water (Dacusville/Cedar Rock)
Sewerage: Onsite Septic
Private Road Standards
1012 (c) Private Roads.
(1) The maximum number of lots which may be served by a private road shall be governed by
Article 4 of this ordinance.
(2) The private road shall be located within a designated right-of-way of at least fifty (50) feet in
width and that right-of-way shall be owned and controlled by a homeowner’s association or
other entity responsible for the road’s maintenance.
(3) All lots must meet minimum Development Ordinance requirements for minimum frontage
onto the private road.
(4) Minimum lot size shall be governed by Article 4.
(5) The private road cannot originate from a shared driveway or from a common drive. The
private road may originate and connect to another private road provided that road meets the
minimum requirements listed in this section.
(6) The maintenance of the private road must be mutually agreed upon by the respective
property owners and this maintenance agreement shall be outlined in an access agreement to
be recorded with the Register of Deeds and individually noted within the respective deeds.
(7) The following plat certification shall be placed upon every plat for every lot utilizing a private
road:
“The private road and associated right-of-way shown on this plat shall be a private access not
owned, maintained, or supervised by Pickens County and not constructed pursuant to any plan
for future acceptance by Pickens County. All easements and rights-of-way shown upon the plat
shall not be accepted for maintenance by Pickens County at any time in the future unless
constructed as a public road in accordance with The Pickens County Unified Development
Ordinance, as amended.”
(8) All subdivisions utilizing private roads for access must be approved by the Planning
Commission in accordance with the procedures listed in Article 12.
(9) Only those lots approved by the Planning Commission and platted with the private road may
utilize said road.
(10) The private road must be named; said name shall be approved by Pickens County E-911
staff.
(11) Construction standards. The private road shall be constructed in accordance with the
respective requirements for a public, local residential street.
Planning Staff Recommendation:
April Valley Lane does not meet the standards set forth in the Unified Development Standards Ordinance.
Staff recommends against subdividing property off a substandard private road until the road is upgraded
to meet the Private Road standards specified in Article 10, Section 1012 (c) of the Pickens County Unified
Development Standards Ordinance.
Pickens County, SC
Developed by
Parcel ID 5101-00-89-0912
Account No R0093647
Property
Address
300 APRIL VALLEY LN
PICKENS
District A13-Pickens
Brief
Tax Description
W/SIDE BLUE RIDGE RD PLAT
616/101 PLAT 614/157 PLAT
614/286 PLAT 614/293 PLAT
614/295
(Note: Not to be used on legal
documents)
Account
Type
Vacant
Land
Class n/a
Acreage 19.494
LEA
Code
0016
Value $1,193
Ownership PATTERSON
SCOTT LEE
112
WOODSTONE
DR
GREENVILLE,
SC 29611-
0000
Documents
Date Price Doc Vacant or
Improved
8/30/2022 $305,000 2448/ / 257 Vacant
1/12/2022 $0 616 / 101 Vacant
Date created: 12/18/2024
Last Data Uploaded: 12/17/2024 8:24:56 PM
806 ft
Overview
Legend
Parcels
911 Address
Roads
January 2025
LU-24-0010
Phase 2 Speedway
Multi-Use Park
ADDENDUM TO THE
APPLICATION FOR LAND USE REVIEW/SUBDIVISION REVIEW
APPLICATIONS FOR LAND USE AND SUBDIVISION REVIEW HEARINGS
PICKENS COUNTY, SOUTH CAROLINA
APPLICANT: SC SPEEDWAY HWY 124, LLC
PROPERTY OWNER: ESTATE OF FRANCES L. MERCER, BY AND THROUGH HER
PERSONAL REPRESENTATIVE ELIZABETH LARK MERCER HUNTER
SIGNATURE PAGE
ESTATE OF FRANCES L. MERCER - OWNER OF THE FOLLOWING PARCEL:
Tax Map Number 5049-08-98-2239 consisting of approximately 12.9 acres
ESTATE OF FRANCES L. MERCER
Name: Elizabeth Lark Mercer Hunter
Title: Personal Representative of the Estate of Frances L. Mercer
Date: August 22 2024
Judson Mills Bldg 6000, Ste 6060, 701 Easley Bridge Rd, Greenville, SC 29611
(864) 298-0534 | SeamonWhiteside.com
Mount Pleasant | Greenville | Summerville | Spartanburg | Charlotte
Elevating the site design experience.
Seamon Whiteside & Associates, Inc
701 Easley Bridge Road, Ste. 6060
Greenville SC, 29611
November 11, 2024
Pickens County Planning Department
222 McDaniel Avenue, B-10
Pickens, SC 29671
Letter of Intent
Dear Trad,
This letter is to inform you of the necessary information regarding the land use development. The
property in question is to be used for an industrial park. Approximately 110 AC of the total 289
AC are being disturbed in the initial phase. 19 existing lots have been consolidated into five (5)
lots. Six (6) buildings were approved for the multi-use commercial park per approval number
LU-24-0004.
Phase 2 will disturb approximately 153 AC of the total 289 AC, consolidating 6 lots into two (2)
multi-use lots. Four (4) additional buildings will be constructed, comprising a total of no more
than 2,900,000 SF.
Your expeditious review is greatly appreciated. Ple ase contact me via phone at 843-333-5962 or
email at rhall@seamonwhiteside.com if you have any questions or need further clarification for
this project.
Seamon Whiteside and Associates, Inc.
Ryan Hall, P.E.
Civil Engineering Director
124
123
(BUILDING 10)337,500 SF(450' X 750')FFE: 665.00
130' DEEP TRUCK COURT
STORAGE LOT /TRAILER PARKING1 AC ±
130' DEEPTRUCK COURT
130' DEEPTRUCKCOURT
±100 PARKINGSPACES
BUILDING 8337,500 SF(450' X 750')
BUILDING 7251,100 SF310' x 810'
STORAGE LOT /TRAILER PARKING1 AC ±
1.44 ACESTIMATEDDETENTIONPOND
250 PARKING SPACES
BUILDING 2252,720 SF260' x 972'FFE ±966
BUILDING 3210,000 SF(600' X 350')FFE ±968
BUILDING 1267,840 SF310' x 864'FFE ±908
BUILDING 4STAMPINGINJECTION62,500 SF(250' X 250')FFE ±963
BUILDING 5PRODUCTIONEXPANSION210,000 SF(600' X 350')FFE ±958
BUILDING 6PRODUCTIONEXPANSION210,000 SF(600' X 350')FFE ±953
OFFICE17,500 SF50' x 350'
OFFICE12,500 SF50' x 250'
OFFICE12,500 SF50' x 250'
OFFICE25,000 SF100' x 250'
203 PARKING SPACES
189 PARKING SPACES
189 PARKING SPACES
79 PARKING SPACES
PAVILLION
CROSWELL SCHOOL ROAD
0.80 ACESTIMATEDDETENTIONPOND
0.64 ACESTIMATEDDETENTIONPOND
250± PARKING SPACES
1.73 ACESTIMATEDDETENTIONPOND
PHASE 1 ACCESS(TRUCK ACCESS)
GEORGES CREEK
CROSSWELL SCHOOLROAD (PRESCRIPTIVE R/W)
PASSENGER AND EMERGENCYVEHICLE ENTRANCE ONLY
INTERNAL PROPERTYLINES ARE CONCEPTUALIN NATURE
BUILDING 9677,160 SF570' x 1,188'
185' TRUCK COURT WITH +/-80 TRAILERSPACES
185' TRUCK COURT WITH +/-88 TRAILERSPACES
0.80 ACESTIMATEDDETENTIONPOND
2.46 ACESTIMATEDDETENTIONPOND
1.81 ACDETENTIONPOND
1.56 ACDETENTIONPOND
CLASS 1 LANDSCAPEBUFFER (30' FROM R/W)FRONT SETBACK (20' FROM R/W)
7' SIDE SETBACK
30' CLASS 1LANDSCAPE BUFFER
10' REAR SETBACK30' CLASS 1 LANDSCAPE BUFFER7' SIDE SETBACK
40' CLASS 2 LANDSCAPE BUFFER20' FRONT SETBACK
40' CLASS 2 LANDSCAPE BUFFER
EXISTING FLOODPLAIN
30' CLASS 1 LANDSCAPEBUFFER
30' CLASS 1 LANDSCAPE BUFFER
25' CLASS 5 LANDSCAPE BUFFER
45454545
4545
4545454545454545454545454545454545454545454545454545454545454545
GREENVILLE-PICKENS SPEEDWAY
NOTE: THIS PLAN IS CONCEPTUAL IN NATURE AND SUBJECT TO CHANGESPEEDWAY MULTI USE PARKPHASE 2PICKENS COUNTY, SC11/10/2024
PLOTTED:11/11/2024 9:19 AM, BY Benjamin Withrow P:\ACAD-D-3\10066\CAD Files\Exhibits\Land Use - PC\Speedway Indsutrial Master Plan Ph2 - Planning Commission.dwg
0SCALE: 1" = 200'100200400SEWN
PHASE 1 MULTI-USE PARK.APPROVAL NO.: LU-24-0004
GENERAL INFORMATIONTMS # = 5049-12-95-1720; 5049-12-97-4069; 5049-08-97-5822;5049-08-87-9745; 5049-08-98-2239; 5049-08-88-4098; 5049-12-86-3788;5049-12-76-6183; 5049-12-85-7235TOTAL LOT AREA = 289 ACBUILDING 7, 8, AND 9 LOT AREA = 121 ACBUILDING 10 LOT AREA = 32 ACTOTAL BUILDING LOT AREA = 153 ACZONING = GENERAL DEVELOPMENT DISTRICTSETBACKS: FRONT = 20 LF SIDE = 7 LF REAR = 10 LFBUFFERYARD: AS NOTEDMAX DENSITY: 0.75 FAR x 289 AC x 43,560 SQFT = 9,441,630 SQFTBUILDING AREA = ±2,900,000 SQFTFLOOD ZONE : ZONE X/AE
PROPOSED PHASE 2MULTI-USE PARK
LU-24-0010: GP Speedway Multi-Use Park Phase 2
Staff Report
Planning Commission Public Hearing: January 13, 2025 6:30 PM
The following report constitutes an assessment and evaluation by Planning Staff
on the above mentioned request.
Applicant: SC Speedway Hwy 124, LLC
201 Riverplace, Ste 400
Greenville, SC 29601
Property Owner(s): SC Speedway Hwy 124, LLC
Property Location: 3800 Calhoun Memorial Highway
Acreage: 153
Tax Map Numbers: 5049-12-95-1720; 5049-12-86-3788; 5049-
12-97-4069; 5049-12-88-7235; 5049-12-
76-6183; 5049-08-97-5822; 5049-18-87-
9745; 5049-08-88-4098; 5049-08-98-2239
County Council District 6
Land Use Request: Creation of a Multi-Use Park.
Variance Request(s) from Planning Commission: None
Request Overview:
This is Phase 2 of the proposal to transform the Greenville Pickens Speedway and its surrounding
area into a Multi-Use Park. In this phase, four new buildings will be constructed totaling 2,900,000
square feet. The total area of the site is 153 acres. The current site plan indicates that the racetrack
will remain intact, with a temporary site entrance located off SC Hwy 124 to the east of the track.
Current Property Use:
The properties are listed on the Assessor’s site as a combination of commercial, residential, and
vacant
Surrounding Area:
The area to the west is mostly residential, the area to the north is bordered by Southern Railway
and mostly vacant land, to the east is vacant land, and to the south is SC Hwy 123 and SC Hwy
124 and commercial uses.
Utilities & Infrastructure
Transportation:
The property is proposed to be served by SC Hwy 124, which is a state-maintained roadway.
Water:
Properties to be serviced by Powdersville Water
Sewerage:
Properties to be serviced by Easley Combined Utilities.
Property Development History:
This property appears to have been commercial for as far back as 1966.
Comments from Reviewing Agencies:
SCDOT: Has issued a encroachment approval for phase 1
Pickens County Engineer: Has been in contact about the project via email communication.
Schools:
N/A
Storm Water: Storm Water Permit will be required.
Staff Analysis of Standards for Land Use Approval:
Staff analysis of the application is made based upon the findings criteria as set forth in
Section 1205(f) of the UDSO. The applicant has submitted his/her response to the same
findings criteria.
A. Is the proposed use consistent with other uses in the area or the general
development patterns occurring in the area?
The proposed use, if developed according to existing County standards and
according to the applicant’s submitted proposal, will be consistent with the
majority of uses in the immediate area and the direction set by the
Comprehensive Plan.
B. Will the proposed use adversely affect the existing use or usability of adjacent or
nearby property?
With strict adherence to the development standards for the proposed uses, the
proposed use should not adversely affect the existing use of adjacent property.
C. Is the proposed use compatible with the goals, objectives, purpose and intent of the
Comprehensive Plan?
The proposed use is consistent with the adopted Future Land Use/Character
Area map of the Comprehensive Plan. The Character Area designation for the
area is Commercial Gateway Corridor.
D. Will the proposed use not cause an excessive or burdensome use of public facilities
or services, including but not limited to streets, schools, water or sewer utilities,
and police or fire protection?
If developed according to adopted development standards, the project should
not cause a burden on existing facilities or services.
E. Is the property suitable for the proposed use relative to the requirements set forth
in this development ordinance such as off -street parking, setbacks, buffers, and
access?
Yes. The applicant’s proposal before the Commission will meet the respective
standards as set forth in the Unified Development Standards Ordinance of
Pickens County.
F. Does the proposed use reflect a reasonable balance between the promotion of the
public health, safety, morality, or general welfare and the right to unrestricted use
of property?
As proposed by the applicant and as outlined in the UDSO the proposed
development of the property in question should provide for a reasonable
balance between the promotion of public health, safety, morality, or general
welfare and the right to unrestricted use of property.
General Requirements for A Large Project:
Sec. 309 Large Scale Projects.
309 (a) Purpose.
Large-scale projects can substantially impact environmental features, surrounding land
use, traffic conditions and facilities, and public utilities. The purposes of this section,
therefore, are to assure the proper siting of such projects in relation to th eir surroundings,
and to avoid any negative impacts from improper planning and design.
309 (b) Definition.
For purposes of this section, a large-scale project is defined as follows:
(1) Any project that is capable of generating 1,000 average daily vehicle trips or more.
Anticipated vehicle trips will be based upon the most current edition of Trip Generation
published by the Institute of Transportation Engineers.
(2) A truck or bus terminal, including service facilities designed principally for such uses.
(3) Outdoor sports or similar recreational facilities that encompass one (1) or more total
acres in parking and facilities.
309 (c) Site Access Requirements.
(1) External Road Configurations
a. Road systems serving large scale projects shall be designed in relation to existing
and planned external systems.
b. To ensure proper location of vehicular access points along existing collector and
arterial County roads, the SCDOT Access and Roadside Management Standards,
as amended, shall be adhered to in providing for vehicular access to all collector
and arterial streets. Principal vehicular access points shall be designed to encourage
smooth traffic flow with controlled turning movement and minimize hazards to
vehicular and pedestrian traffic. Merging and turning lanes and/or traffic dividers
shall be required where existing or anticipated heavy flows indicate need.
c. Such projects shall not be permit- ted access to a local residential street, but may
border or front on a local commercial or industrial street. Where a large scale
project is adjacent to more than one street, access shall be taken from the lower
classification of street permitted, where feasible.
d. Access for pedestrians and shall be by safe and convenient routes. Such access
need not be adjacent to or limited to the vicinity of access points for automotive
vehicles. Where there are crossings of pedestrian ways and vehicular routes at edges
of projects, such crossings shall be safely located, marked and controlled and where
such ways are exposed to substantial automotive traffic at edges of the district,
safeguards including fencing may be required to prevent crossing except at
designed points.
e. More specifically, ingress, egress openings in concrete, asphalt, rock or other
street curbing provisions, commonly referred to as "curb cuts", as well as other
means of vehicular access to and from such projects shall be in accordance with the
following requirements.
(1) Access points to large -scale projects shall consist of two twelve (12)
foot exit lanes and a twenty (20) foot entrance lane. A twenty-five (25) foot
turning radius space will be provided and one hundred (100) feet of right -
of-way where entrance/exit fronts with the intersecting street. Entrances and
exits may not take access closer than one hundred twenty -five (125) feet
from the right-of-way line of an intersecting major local or collector street
and one hundred fifty (150) feet from an intersecting arterial street.
(2) In no case shall any point of access or other means of vehicular ingress
and egress from private property onto a public street be permitted closer
than two hundred (200) feet to the intersecting point of that street's right-of-
way line with the right -of-way of any portion of an interchange involving
grade separations with that road and any limited access high - ways, said
interchange to include all portions of all ramps, accelerating and
decelerating lanes, merge lanes and other facilities specifically d e- signed
to facilitate traffic movement onto and off of the limited access highway.
(3) Where possible, entrances shall be located in a manner to allow at least
one hundred (100) feet of sight distance for each ten (10) miles per hour of
speed limit. Sight distance shall be measured from a seeing height of three
and one-half (3.5) feet to an object one foot in height.
(4) A fifteen (15) foot sight easement triangle shall be reserved by the
developer and dedicated to Pickens County with the recording of the final
plat. The sight easement shall be shown on the final plat before it is
recorded.
(2) Internal Road Configurations
a. Streets, drives, and parking and service areas shall provide safe and convenient
access to dwelling units and general facilities and for service and emergency
vehicles. Streets shall be laid out so as not to encourage outside traffic to traverse
the development on minor streets, not occupy more land than is required to provide
access as indicated, or create unnecessary fragmentation of the project into small
blocks. In general, the project shall be consistent with use and shape of the site and
the convenience and safety of occupants and persons frequenting the project.
b. Vehicular access to collector and arterial streets or portions of streets from off -
street parking and service areas shall be so combined, limited, located, designed,
and controlled as to channel traffic to and from such areas conveniently, safely, and
in a manner that minimizes traffic friction and promotes free flow of traffic on
streets without excessive interruptions. To this end, the SCDOT Access and
Roadside Management Standards, as amended, shall be adhered to in providing for
vehicular access to all collector and arterial streets.
Planning Staff Comments:
Planning staff has communicated with the applicant. The site plan meets the standards of
the Unified Development Standards Ordinance. Planning staff recommends the project's
approval.
Pickens County, SC
Developed by
Parcel ID 5049-12-86-3788
Account No R0096778
Property
Address
District G10-Georges Creek/Crosswell
Brief
Tax Description
N/SIDE CROSSWELL SCHOOL RD, SE/SIDE
LATHEM RD PLAT 559/10 PLAT 597/129 PLAT
610/56 PLAT 610/51 PLA
(Note: Not to be used on legal documents)
Account
Type
Vacant
Land
Class n/a
Acreage 41.2
LEA
Code
0011
Value $0
Ownership WHITAKER
KEVIN
615 ROPER
MOUNTAIN
RD
GREENVILLE,
SC 29615
Documents
Date Price Doc Vacant or
Improved
n/a $ / n/a
n/a $ / n/a
Date created: 12/18/2024
Last Data Uploaded: 12/17/2024 8:24:56 PM
1,180 ft
Overview
Legend
Parcels
911 Address
Roads
61
CHAPTER 5 | LAND USE
DRAFT | APRIL 2022
Character Areas
Recreation and Open Space Community
Commercial Center
Agricultural Preservation Commercial
Gateway CorridorRural Places
Workplace Centers
Residential Growth
Institutional and
Educational
Urban Residential
SR 11 Scenic Corridor
Neighborhood
Commercial Center
January 2025
LU-24-0011
Phase 3 Speedway
Multi-Use Park
ADDENDUM TO THE
APPLICATION FOR LAND USE REVIEW/SUBDIVISION REVIEW
APPLICATIONS FOR LAND USE AND SUBDIVISION REVIEW HEARINGS
PICKENS COUNTY, SOUTH CAROLINA
APPLICANT: SC SPEEDWAY HWY 124, LLC
PROPERTY OWNER: ESTATE OF FRANCES L. MERCER, BY AND THROUGH HER
PERSONAL REPRESENTATIVE ELIZABETH LARK MERCER HUNTER
SIGNATURE PAGE
ESTATE OF FRANCES L. MERCER - OWNER OF THE FOLLOWING PARCEL:
Tax Map Number 5049-08-98-2239 consisting of approximately 12.9 acres
ESTATE OF FRANCES L. MERCER
Name: Elizabeth Lark Mercer Hunter
Title: Personal Representative of the Estate of Frances L. Mercer
Date: August 22 2024
Judson Mills Bldg 6000, Ste 6060, 701 Easley Bridge Rd, Greenville, SC 29611
(864) 298-0534 | SeamonWhiteside.com
Mount Pleasant | Greenville | Summerville | Spartanburg | Charlotte
Elevating the site design experience.
Seamon Whiteside & Associates, Inc
701 Easley Bridge Road, Ste. 6060
Greenville SC, 29611
November 11, 2024
Pickens County Planning Department
222 McDaniel Avenue, B-10
Pickens, SC 29671
Letter of Intent
Dear Trad,
This letter is to inform you of the necessary information regarding the land use development. The
property in question is to be used for an industrial park. Approximately 110 AC of the total 289
AC are being disturbed in the initial phase. 19 existing lots have been consolidated into five (5)
lots. Six (6) buildings were approved for the multi-use commercial park per approval number
LU-24-0004.
Phase 3 will disturb approximately 33 AC of the total 289 AC, and will not divide the existing
parcel. Within that parcel, nine (9) additional buildings will be constructed, comprising a total of
no more than 800,000 SF.
Your expeditious review is greatly appreciated. Ple ase contact me via phone at 843-333-5962 or
email at rhall@seamonwhiteside.com if you have any questions or need further clarification for
this project.
Seamon Whiteside and Associates, Inc.
Ryan Hall, P.E.
Civil Engineering Director
OUTPARCELPONDOUTPARCEL 5+/- 1.7 ACRES
INDUSTRIAL 1120' x 500'60,000 SFINDUSTRIAL 2120' x 500'60,000 SFINDUSTRIAL 3120' x 632'75,840 SF
INDUSTRIAL 3POND
INDUSTRIAL 1+2POND
OUTPARCELWET POND
ALTERNATE OUTPARCEL ROADOUTPARCEL 6+/- 2.7 ACRES
124
123
BUILDING 1267,840 SF310' x 864'FFE ±908
CROSWELL SCHOOL ROAD
PHASE 1 ACCESS(TRUCK ACCESS)
1.56 ACDETENTIONPOND
CLASS 1 LANDSCAPEBUFFER (30' FROM R/W)FRONT SETBACK (20' FROM R/W)4545454545454545
45454545
45
45454545454545454545454545454545454545454545454545
NOTE: THIS PLAN IS CONCEPTUAL IN NATURE AND SUBJECT TO CHANGE
PLOTTED:11/11/2024 1:34 PM, BY Austin Horvat P:\ACAD-D-3\10066\CAD Files\Exhibits\Land Use - PC\Speedway Indsutrial Master Plan Ph3 - Planning Commission.dwg
SCALE: 1" = 100'050100200SEWN
PHASE 1 MULTI-USE PARK.APPROVAL NO.: LU-24-0004GENERAL INFORMATIONTMS # = 5049-16-94-6647TOTAL LOT AREA = 289 ACEXISTING SPEEDWAY LOT AREA = 33 ACTOTAL BUILDING LOT AREA = 33 ACZONING = GENERAL DEVELOPMENT DISTRICTSETBACKS: FRONT = 20 LF SIDE = 7 LF REAR = 10 LFBUFFERYARD: AS NOTEDMAX DENSITY: 0.75 FAR x 33 AC x 43,560 SQFT = 1,078,110 SQFTBUILDING AREA = ±300,000 SQFTFLOOD ZONE : ZONE X/AE
PROPOSED PHASE 3MULTI-USE PARK
SPEEDWAY MULTI USE PARKPHASE 3PICKENS COUNTY, SC11/10/2024
OUTPARCEL 2
+/-3.86 AC
WB-67 - Interstate Semi-Trailer
WB-67 - Interstate Semi-Trailer
WB-67 - Interstate Semi-Trailer
WB-67 - Interstate Semi-Trailer
10
9
9
10
9
10
10
10
10
10
10
8
8
7
5
10
10
10
PROPOSED INTERSECTION
PROPOSED INTERSECTION
POSSIBLE
NEW ROW
20' SETBACK FROM
NEW ROW
46 34
11
20
9
46
27
158
8,000 GAL
PUL
12,000 GAL
DSL
20,000 GAL
RUL
20,000 GAL/6,000 GAL
DSL
DEF
20,000 GAL
DSL
HIGHWAY 123
OUTPARCEL 1
+/- 3.3 AC
OUTPARCEL 2
+/- 2.2 ACRES
OUTPARCEL 3
+/- 2.9 ACRES
OUTPARCEL 4
+/- 3.3 ACRES
[gas station]
BUILDING 1
BUILDING 12
HIGHWAY 123
POND
PEDESTRIAN
SIDEWALK & LANDSCAPE
MONUMENT BOULEVARD + FLAGS
OUTPARCEL 6
+/ - 23.33 ACRES
THE LINE SHOWN ABOVE IS EXACTLY
ONE INCH LONG AT THIS SHEETS
ORIGINAL PAGE SIZE
LS3P PROJECT:
ORIG
SUBMISSION:
NOT
FOR
CONSTR
UCT
ION
SHEET NAME:
SHEET:
A
B
C
D
E
1 2 3 4 5 6
DATE DESCRIPTION ∆
COPYRIGHT 2023 ALL RIGHTS RESERVED. PRINTED OR
ELECTRONIC DRAWINGS AND DOCUMENTATION MAY
NOT BE REPRODUCED IN ANY FORM WITHOUT WRITTEN
PERMISSION FROM LS3P ASSOCIATES LTD.
11/27/2024 9:52:23 AM
A-100.5f
OPTION 5 -
INDUSTRIAL
PARCEL 2
3154-240344
10/07/24
Realty Link
Calhoun Memorial Hwy
Easley, South Carolina 29640
Greenville-Pickens
Speedway Concept Plan
PROGRESS
WWW.LS3P.COM
2 WEST WASHINGTON STREET STE 600
GREENVILLE, SOUTH CAROLINA 29601
TEL. 864.235.0405 FAX. 864.233.4027
LU-24-0011: GP Speedway Multi-Use Park
Staff Report
Planning Commission Public Hearing: January 13, 2025 6:30 PM
The following report constitutes an assessment and evaluation by Planning Staff
on the above mentioned request.
Applicant: SC Speedway Hwy 124, LLC
201 Riverplace, Ste 400
Greenville, SC 29601
Property Owner(s): SC Speedway Hwy 124, LLC
Property Location: 3800 Calhoun Memorial Highway
Acreage: 33
Tax Map Numbers: 5049-16-94-6647
County Council District 6
Land Use Request: Creation of a Multi-Use Park.
Variance Request(s) from Planning Commission: None
Request Overview:
This is phase 3 of the proposal to transform the Greenville Pickens Speedway and its surrounding
area into a Multi-Use Park. Nine buildings will be constructed, covering a total of 800,000 square
feet. The entire site spans 33 acres. This site plan indicates that this ph ase will be developed over
the racetrack, with the site entrance relocated to SC Hwy 123.
Current Property Use:
The property is listed on the Assessor site as commercial.
Surrounding Area:
The area to the west is mostly residential, the area to the north is bordered by Southern Railway
and mostly vacant land, to the east is vacant land, and to the south is SC Hwy 123 and SC Hwy
124 and commercial uses.
Utilities & Infrastructure
Transportation:
The property is proposed to be served by SC Hwy 123, which is a state-maintained roadway.
Water:
Properties to be serviced by Powdersville Water
Sewerage:
Properties to be serviced by Easley Combined Utilities.
Property Development History:
This property appears to have been commercial for as far back as 1965.
Comments from Reviewing Agencies:
SCDOT: Has issued an encroachment approval for phase 1
Pickens County Engineer: Has been in contact about the project via email communication.
Schools:
N/A
Storm Water: The site plan is currently under review.
Staff Analysis of Standards for Land Use Approval:
Staff analysis of the application is made based upon the findings criteria as set forth in
Section 1205(f) of the UDSO. The applicant has submitted his/her response to the same
findings criteria.
A. Is the proposed use consistent with other uses in the area or the general
development patterns occurring in the area?
The proposed use, if developed according to existing County standards and
according to the applicant’s submitted proposal, will be consistent with the
majority of uses in the immediate area and the direction set by the Comp Plan.
B. Will the proposed use adversely affect the existing use or usability of adjacent or
nearby property?
With strict adherence to the development standards for the proposed uses, the
proposed use should not adversely affect the existing use of adjacent property.
C. Is the proposed use compatible with the goals, objectives, purpose and intent of the
Comprehensive Plan?
The proposed use is consistent with the adopted Future Land Use/Character
Area map of the Comprehensive Plan. The Character Area designation for the
area is Commercial Gateway Corridor.
D. Will the proposed use not cause an excessive or burdensome use of public facilities
or services, including but not limited to streets, schools, water or sewer utilities,
and police or fire protection?
If developed according to adopted development standards, the project should
not cause a burden on existing facilities or services.
E. Is the property suitable for the proposed use relative to the requirements set forth
in this development ordinance such as off -street parking, setbacks, buffers, and
access?
Yes. The applicant’s proposal before the Commission will meet the respective
standards as set forth in the Unified Development Standards Ordinance of
Pickens County.
F. Does the proposed use reflect a reasonable balance between the promotion of the
public health, safety, morality, or general welfare and the right to unrestricted use
of property?
As proposed by the applicant and as outlined in the UDSO the proposed
development of the property in question should provide for a reasonable
balance between the promotion of public health, safety, morality, or general
welfare and the right to unrestricted use of property.
General Requirements for A Large Project:
Sec. 309 Large Scale Projects.
309 (a) Purpose.
Large-scale projects can substantially impact environmental features, surrounding land
use, traffic conditions and facilities, and public utilities. The purposes of this section,
therefore, are to assure the proper siting of such projects in relation to th eir surroundings,
and to avoid any negative impacts from improper planning and design.
309 (b) Definition.
For purposes of this section, a large-scale project is defined as follows:
(1) Any project that is capable of generating 1,000 average daily vehicle trips or more.
Anticipated vehicle trips will be based upon the most current edition of Trip Generation
published by the Institute of Transportation Engineers.
(2) A truck or bus terminal, including service facilities designed principally for such uses.
(3) Outdoor sports or similar recreational facilities that encompass one (1) or more total
acres in parking and facilities.
309 (c) Site Access Requirements.
(1) External Road Configurations
a. Road systems serving large scale projects shall be designed in relation to existing
and planned external systems.
b. To ensure proper location of vehicular access points along existing collector and
arterial County roads, the SCDOT Access and Roadside Management Standards,
as amended, shall be adhered to in providing for vehicular access to all collector
and arterial streets. Principal vehicular access points shall be designed to encourage
smooth traffic flow with controlled turning movement and minimize hazards to
vehicular and pedestrian traffic. Merging and turning lanes and/or traffic dividers
shall be required where existing or anticipated heavy flows indicate need.
c. Such projects shall not be permit- ted access to a local residential street, but may
border or front on a local commercial or industrial street. Where a large scale
project is adjacent to more than one street, access shall be taken from the lower
classification of street permitted, where feasible.
d. Access for pedestrians and shall be by safe and convenient routes. Such access
need not be adjacent to or limited to the vicinity of access points for automotive
vehicles. Where there are crossings of pedestrian ways and vehicular routes at edges
of projects, such crossings shall be safely located, marked and controlled and where
such ways are exposed to substantial automotive traffic at edges of the district,
safeguards including fencing may be required to prevent crossing except at
designed points.
e. More specifically, ingress, egress openings in concrete, asphalt, rock or other
street curbing provisions, commonly referred to as "curb cuts", as well as other
means of vehicular access to and from such projects shall be in accordance with the
following requirements.
(1) Access points to large -scale projects shall consist of two twelve (12)
foot exit lanes and a twenty (20) foot entrance lane. A twenty-five (25) foot
turning radius space will be provided and one hundred (100) feet of right -
of-way where entrance/exit fronts with the intersecting street. Entrances and
exits may not take access closer than one hundred twenty -five (125) feet
from the right-of-way line of an intersecting major local or collector street
and one hundred fifty (150) feet from an intersecting arterial street.
(2) In no case shall any point of access or other means of vehicular ingress
and egress from private property onto a public street be permitted closer
than two hundred (200) feet to the intersecting point of that street's right-of-
way line with the right -of-way of any portion of an interchange involving
grade separations with that road and any limited access high - ways, said
interchange to include all portions of all ramps, accelerating and
decelerating lanes, merge lanes and other facilities specifically d e- signed
to facilitate traffic movement onto and off of the limited access highway.
(3) Where possible, entrances shall be located in a manner to allow at least
one hundred (100) feet of sight distance for each ten (10) miles per hour of
speed limit. Sight distance shall be measured from a seeing height of three
and one-half (3.5) feet to an object one foot in height.
(4) A fifteen (15) foot sight easement triangle shall be reserved by the
developer and dedicated to Pickens County with the recording of the final
plat. The sight easement shall be shown on the final plat before it is
recorded.
(2) Internal Road Configurations
a. Streets, drives, and parking and service areas shall provide safe and convenient
access to dwelling units and general facilities and for service and emergency
vehicles. Streets shall be laid out so as not to encourage outside traffic to traverse
the development on minor streets, not occupy more land than is required to provide
access as indicated, or create unnecessary fragmentation of the project into small
blocks. In general, the project shall be consistent with use and shape of the site and
the convenience and safety of occupants and persons frequenting the project.
b. Vehicular access to collector and arterial streets or portions of streets from
off-street parking and service areas shall be so combined, limited, located,
designed, and controlled as to channel traffic to and from such areas conveniently,
safely, and i n a manner that minimizes traffic friction and promotes free flow of
traffic on streets without excessive interruptions. To this end, the SCDOT Access
and Roadside Management Standards, as amended, shall be adhered to in providing
for vehicular access to all collector and arterial streets.
Planning Staff Comments:
Planning staff has been in contact with the applicant. The site plan complies with the Unified
Development Standards Ordinance. Planning staff recommends approval of the project.
Pickens County, SC
Developed by
Parcel ID 5049-16-94-6647
Account No R0096776
Property
Address
3800 CALHOUN MEM HWY
EASLEY
District G10-Georges Creek/Crosswell
Brief
Tax Description
HWY 123 AT CROSWELL SCHOOL RD,
PLAT 620/78 TR 3B
(Note: Not to be used on legal documents)
Account
Type
Commercial
Class Stadiums
*CODE
Acreage 33.4
LEA Code 0010
Value $0
Ownership RACETRACK
LLC
C/O KEVIN
WHITAKER
PO BOX 6628
GREENVILLE,
SC 29615
Documents
Date Price Doc Vacant or
Improved
n/a $ / n/a
n/a $ / n/a
Date created: 12/18/2024
Last Data Uploaded: 12/17/2024 8:24:56 PM
590 ft
Overview
Legend
Parcels
911 Address
Roads
61
CHAPTER 5 | LAND USE
DRAFT | APRIL 2022
Character Areas
Recreation and Open Space Community
Commercial Center
Agricultural Preservation Commercial
Gateway CorridorRural Places
Workplace Centers
Residential Growth
Institutional and
Educational
Urban Residential
SR 11 Scenic Corridor
Neighborhood
Commercial Center
Source: Pickens County website. First collected Nov 7, 2026.