Historic Preservation Review Committee Meeting — Agenda Packet
Town of Bluffton · Beaufort County · Historic Preservation Review Committee · meeting of Mar 30, 2026 · Agenda packets
Open the original document More from Town of Bluffton
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Historic Preservation Review Committee Meeting
Monday, March 30, 2026 at 4:00 PM
Theodore D. Washington Municipal Building, Henry “Emmett” McCracken Jr. Council Chambers,
20 Bridge Street, Bluffton, SC
AGENDA
I. CALL TO ORDER
II. ROLL CALL
III. PUBLIC COMMENT
IV. OLD BUSINESS
V. NEW BUSINESS
1. 33 Guerrard Avenue: A request by Chris Epps (InCircle Architecture), on behalf of the owner,
Webbdean Dev, LLC, for a review of a Certificate of Appropriateness - HD to construct a new
2-story Side Yard House of approximately 2,269 SF and a 2-story detached Carriage House of
approximately 996 SF, to be located at 33 Guerrard Avenue in Old Town Bluffton Historic
District and zoned Neighborhood General - HD zoning District. (COFA-03-26-020160) (Staff –
Charlotte Moore)
VI. DISCUSSION
VII. ADJOURNMENT
NEXT MEETING DATE: Monday, April 6, 2026
Page 1
Town of Bluffton, SC Historic Preservation Review Committee Meeting Agenda March 30, 2026
“FOIA Compliance – Public notification of this meeting has been published and posted in compliance
with the Freedom of Information Act and the Town of Bluffton policies.”
In accordance with the requirements of Title II of the Americans with Disabilities Act of 1990 ("ADA"), the
Town of Bluffton will not discriminate against qualified individuals with disabilities on the basis of
disability in its services, programs, or activities. The Town of Bluffton Council Chambers are ADA
compatible. Auditory accommodations are available. Any person requiring further accommodation
should contact the Town of Bluffton ADA Coordinator at 843.706.4500 or
adacoordinator@townofbluffton.com as soon as possible but no later than 48 hours before the
scheduled event.
Executive Session – The public body may vote to go into executive session for any item identified for
action on the agenda.
*Please note that each member of the public may speak at one public comment session and a form must
be filled out and given to the Town Clerk. To submit a public comment online, please click here:
https://www.townofbluffton.sc.gov/FormCenter/Town-15/Public-Comment-60
Public comment is limited to 3 minutes per speaker.
Page 2
PLAN REVIEW COMMENTS FOR COFA-03-26-020160
Town of Bluffton
Department of Growth Management
20 Bridge Street P.O. Box 386 Bluffton, South Carolina 29910
Telephone 843-706-4522
OLD TOWN
Plan Type: Apply Date:
Plan Status: Plan Address: 33 Guerrard Avenue
BLUFFTON, SC 29910
Historic District
Active
03/05/2026
Plan PIN #:Case Manager: R610 039 00A 0425 0000Charlotte Moore
Plan Description: A request by Chris Epps (InCircle Architecture), on behalf of the owner, Webbdean Dev, LLC, for a review of a
Certificate of Appropriateness - HD to construct a new 2-story Side Yard House of approximately 2,269 SF and
a 2-story detached Carriage House of approximately 996 SF, to be located at 33 Guerrard Avenue in Old Town
Bluffton Historic District and zoned Neighborhood General - HD zoning District. STATUS (03.24.2026): Concept
Plan to be reviewed by HPRC on March 30, 2026.
Staff Review (HD)
Submission #: 1 Recieved: 03/05/2026 Completed:
Reviewing Dept. Complete Date StatusReviewer
Approved with Conditions03/27/2026Beaufort Jasper Water and Sewer
Review
Matthew Michaels
Comments:
Comments may be provided at time of building permit application.
Approved with Conditions03/27/2026Growth Management Dept Review
(HD)
Charlotte Moore
Comments:
03/27/2026 Page 1 of 3Page 3
Section V. Item # 1.
1. Lot Coverage: Per UDO Sec. 5.15.5.C., the maximum lot coverage permitted in the NG-HD district for a Side-yard House is
60% (as of January 13, 2026 UDO text amendment). Per UDO Sec. 9.3.D.2., lot coverage is the “portion of the lot covered by any
structure or constructed element that impedes infiltration of stormwater into the ground or disrupts vegetated surfaces. For
purposes of lot coverage standards, structures or constructed elements that allow some infiltration, such as decks, patios and
driveways, porous pavers or concrete, or other elements that disturb ground cover shall be counted towards the total surface
coverage unless they demonstrate they are a functional and integral part of a stormwater system and best management practice
in Article 5, Design Standards.” The driveway is shown as “permeable” on the survey but may be impermeable unless the
stormwater requirements can be met. For assistance, contact Sam Crotty (Town Stormwater Permit Administrator) at
scrotty@townofbluffton.com.
2. Building Orientation: The main structure is not parallel to the street. UDO Sec. 5.15.5.F.5.a. requires that the front principal
façade of a building must be built parallel to the street that it faces.
3. Side Yard: The placement of a Sideyard House in the center of the lot is contrary to the usual location of a Sideyard House,
which would be closer to one of the property lines. UDO Sec. 5.15.8.K. allows the structure to be placed a minimum of five (5) feet
from the property line; the plan shows a side yard of 10’-8”, most of which is a driveway that is located on the property line, thus
preventing the possibility of landscaping or a screening fence.
4. First Floor Height: The first-floor height of the main structure is 2’-10”. Residential structures must have a first finished floor
height raised a minimum of three (3) feet above average adjacent sidewalk grade (UDO Sec. 5.15.5.F.1.c.).
5. Service Yards: The service yard for the main structure may be undersized, and the gate must be removed for utility access if
electric meters are within this area (likewise for carriage house service yard).
6. Foundation: Provide a foundation detail. Per UDO Sec. 5.15.6.O., underpinning must be a minimum of 1-inch behind the face
of piers.
7. Chimney: Provide a chimney cap detail, with material to be used, and consider a more traditional cap, such as a bishop’s
arch. A double bishop’s arch is suggested.
8. Windows: a) There are multiple fixed windows, which is not an operation permitted per UDO Sec. 5.15.6.I.3.b. (single/double
hung, casement, awning/tilt are permitted). b) Per UDO Sec. 5.15.6.I.1.b., window openings should be oriented vertically, and
vertical rhythm should be established (UDO Sec. 5.15.5.F.4.e.) Multiple windows are oriented horizontally, and vertical rhythm is
lacking on the left elevation. Restudy these window configurations. Label window types.
9. Doors: a) Reconsider the lite pattern on the Carriage House door as it does not match the door or window patterns on the
main structure; b) The door headers on the second-story porch differ from the door headers on the ground floor; and, c) Label
door types. Carriage house door does not show as a door type.
10. Roof: The Project Analysis sheet indicates a “metal” roof of unknown configuration is proposed; the plans show architectural
shingles. Provide correct roof type; if metal, identify the metal type and whether the roof will be standing-seam or 5-V crimp as
required by UDO Sec. 5.15.6.J. Show porch ceiling material and configuration (e.g., beaded, tongue & groove).
11. Materials, Configurations and Dimensions: Label all materials on the Final Plan (in addition to the Project Analysis sheet)
and ensure that they comply with UDO Sec. 5.15., as applicable. Any materials, configurations and dimensions not in compliance
with the UDO must be identified in a narrative with an explanation for consideration by the HPC. Include vent, soffit (UDO Sec.
5.15.6.P.), porch ceiling details. The Final Plan will not be scheduled for an HPC agenda if information is missing.
12. Landscape Plan: Provide a Landscape Plan that shows 75% tree canopy coverage at maturity (UDO Sec. 5.3.3.G.1.); provide
a street tree (UDO Sec. 5.3.7.A.); provide 8’-0” foundation planting at front elevation (UDO Sec. 5.3.7.E.2.). Landscaping may be
used to screen meters.
13. At time of Final Plan submission, provide a written response to these HPRC comments.
Approved with Conditions03/27/2026HPRC Review Charlotte Moore
Comments:
03/27/2026 Page 2 of 3Page 4
Section V. Item # 1.
1. While a Sideyard House is a permitted building type in this district, Guerrard Avenue is mostly 1 to 1.5 story homes with the
Medium House building type the most common building type for new construction. This type would fit within the small lot much
better and fit well among the other homes.
2. The site plan is missing the service yards and chimney. The carriage house ground floor window and door configurations do
not match the elevations.
3. Provide a section of the porch and paneled portion.
4. Consider use of a finished material like cement board for the trim instead of pressure treated grade wood.
5. Consider adding a trim piece where the wall meets the soffit.
6. The diagonal bracket member is unclear and appears too skinny on the elevations.
7. The left and rear elevations of the house rely too heavily on transom windows. Revisit these elevations to include windows to
break up the facade and balance with the remainder of the architecture.
8. Revisit the panel detail on the stair hall to remove the skinny row at the top of the first floor and make the bottom panels the
same height on both floors
Approved with Conditions03/19/2026Watershed Management Review Samantha Crotty
Comments:
All development exceeding 5,000 sq. ft. of land disturbance will have to meet SoLoCo Standards and retain the first 1.95" of
stormwater onsite using approved BMPs (example: rain gardens or rain barrels). Additional comments may be provided at time of
building permit submittal/stormwater permit review.
Approved03/06/2026Transportation Department
Review - HD
Mark Maxwell
Comments:
No comments
Plan Review Case Notes:
03/27/2026 Page 3 of 3Page 5
Section V. Item # 1.
Source: Town of Bluffton website. First collected Nov 7, 2026.