Planning Commission — Agenda Packet
City of Spartanburg · Spartanburg County · Boards and Commissions · meeting of Dec 21, 2023 · Agenda packets
Open the original document More from City of Spartanburg
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
The City of Spartanburg
Planning Commission
City of Spartanburg | Planning Commission 1
AGENDA
December 21, 2023, at 5:30 P.M.
City Hall Council Chambers
145 W. Broad Street – Spartanburg, SC 29306
(Please Note: Items as they appear on the docket may or may not be considered in the
order as they are presented. The Chair will announce any changes after the roll call)
I. Call to Order.
II. Roll Call.
III. Freedom of Information Act Compliance – Public notification of the Planning Commission meeting
has been published, posted and mailed in compliance with the Freedom of Information Act and the
requirements of the City of Spartanburg Zoning Ordinance.
IV. Approval of Agenda.
V. Disposition of Minutes of the November 16, 2023, Meeting.
VI. Old Business: None.
VII. New Business:
1. Final Development Plan Approval – 500 W. Main Street and 0 Oxford Road (TMS: 7-12-13-
024.00 and 7-12-13-001.00) from B-3, General Business District and R6, General Residential
District to B-3, PDD General Business – Planned Development District to accommodate a mixed-
use development. Owner: Richard Pennell, III; Palmetto Operating Company / Applicant: Brett
Baumgarten; Coastal Partners, LLC / Danny Balon, Seamon Whiteside & Associates.
2. Planning Commission Update – Highland Neighborhood Transformation Plan Progress
VIII. Site and Landscape Plans Approved since the November 16, 2023, Meeting: None.
IX. City Council Updates since the November 16, 2023, Meeting: None.
X. Staff Announcements.
XI. Adjournment.
For more information, please call Martin L. Livingston, Jr., AICP, CPM, Community Development Director at
(864) 580-5323 or by email at planning@cityofspartanburg.org.
Page 1 of 10
Planning Commission - Meeting Minutes – 2023-11-16 Page 1 of 4
P
lanning Commission Meeting Minutes
November 16, 2023 at 5:30 PM
City Hall Council Chambers
B
oard Members Present: Dr. Phillip Stone, Reed Cunningham, Jemar Brown, Santiago Mariani,
Kevin DeMark, Warwick Spencer, and Lekesa Whitner. City Staff Present: Martin Livingston,
Community Development Director, Nan Zhou, City Planner I I; and Robert Coler, City
Attorney.
Rolls
Ms. W
hitner: Lekesa Whitner, Commissioner.
Mr. Mariani: Santiago Mariani, Commissioner.
Mr. Cunningham: Reed Cunningham, Commissioner.
Dr. Stone: Phillip Stone, Commissioner.
Mr. Brown: Jemar Brown, Commissioner
Mr. Spencer: Warwick Spencer, Commissioner.
Mr. DeMark: Kevin DeMark, Commissioner.
D
r. Stone: Alright, I call the November 16, 2023, meeting of the City of Spartanburg of the
Planning Commission to order. My name is Dr. Phillip Stone and I’m the Commission Chair. I will
be residing over this meeting this evening. I will note for the record we have all members of the
Commission present. The Freedom of Information Act Compliance public notification of this
meeting has been published, posted, and mailed in accordance with the Freedom of Information Act
and the requirements of the City of Spartanburg Zoning Ordinance. Dr. Stone also welcomed the
newest member Kevin DeMark to his first meeting since his appointment.
A
pproval of meeting agenda
O
n a motion by Ms. Whitner seconded by Mr. Mariani, the agenda for the meeting was
approved, by a vote of 7 to 0.
M
s. Whitner: I move we accept the agenda.
Mr. Mariani: Second.
Dr. Stone: Moved by Ms. Whitner and seconded by Mr. Mariani to approve the agenda. All in favor
say aye.
Attendees: Aye.
Dr. Stone: Any opposed? The agenda is approved. The minutes of the August 17, 2023 meeting. Do
I hear a motion or any corrections or additions?
A
pproval of Meeting Minutes for August 17, 2023
On a motion by Mr. Spencer seconded by Ms. Whitner, the minutes of the meeting of August
17, 2023, was approved by a vote of 7 to 0.
M
r. Spencer: I make a motion that we accept the minutes of the August 17, 203meeting.
Ms. Whitner: Second
Dr. Phillip: Moved by Mr. Spencer seconded by Ms. Whitner to approve the minutes. All in favor
say aye.
Attendees: Aye.
Page 2 of 10
Planning Commission - Meeting Minutes – 2023-11-16 Page 2 of 4
Dr. Phillip: Any opposed? The Minutes are approved.
Old Business: None.
New Business:
Discussion of Roles and Responsibilities of the Planning Commission and its members. This
item may require an Executive Session Pursuant to Section 30-4-70 (a)(2) of the South
Carolina Code to Discuss Matters Relating to providing legal advice to the Planning
Commission.
Mr. Robert Coler recommended that the Planning Commission members request a motion to enter
executive session to discuss this matter.
On a motion by Mr. Cunningham and seconded by Mr. Mariani, the Planning Commission
en
tered executive session to discuss Matters Relating to providing legal advice to the Planning
Commission by a vote of 7 to 0.
On a motion by Mr. Mariani and seconded by Mr. DeMark,
the Planning Commission exited
executive session. Dr. Stone noted for the record there was no decision made in executive
session and no decision made as a result of the discussion in executive session by a vote of 7 to
0.
D
iscussion on the Comprehensive Plan Implementation Matrix.
Comprehensive Plan - Implementation Strategies
1
Update the Zoning Ordinance and Land Use Regulations to support the development of
mixed income neighborhoods, increase housing diversity, encourage high-quality mixed-use
development along commercial corridors, expand the use of form-based code, and increase
density while ensuring neighborhood stability.
2
Continue to support, promote, and invest in initiatives structured to advance the economic
mobility of youth and communities, led by our local partners (Spartanburg Academic
Movement, Northside Development Group, United Way of the Piedmont, One Spartanburg
Inc., Workforce Investment Board, local Colleges, and Universities, etc.), with emphasis on
the intersectionality of education, health, housing, workforce, business development,
transportation, community-based leadership, and social capital.
3
Encourage and support through regulatory policy, incentives, or financial support compact,
mixed-use development that responds to the wants and needs of residents, workers,
students, and visitors. While Downtown has— and should continue to have—the greatest
mix of uses at the highest intensities, other areas, as shown on the Growth & Conservation
Map, are also appropriate. Such areas are intended to complement, not compete with,
Downtown. On a smaller scale, neighborhood centers and older retail areas should also
accommodate a mix of uses.
Page 3 of 10
Planning Commission - Meeting Minutes – 2023-11-16 Page 3 of 4
4
Initiate the process of becoming a nationally accredited parks and recreation agency. A
process that aims to build a comprehensive management system of operational best
practices, while sustaining high quality, inclusive, and accessible programs, facilities, and
events that are influenced and supported by community members.
5
Ensure downtown Spartanburg is welcoming and inclusive for all residents. This could
include a range of tools from historic interpretation of the history of Spartanburg from
different perspectives, creating amenities and programs that facilitate bringing
communities together, and a focus on businesses that are owned by traditionally under-
represented populations. Seek input from BIPOC residents to determine what would make
downtown feel more welcoming.
6
The City of Spartanburg will develop Sustainability and Resilience Plans to continue to
provide the best quality of life for our residents and businesses. These plans will focus on
public safety, equity, mitigating natural hazards, and economic development. Plans will be
developed in collaboration with the State Office of Resilience, State Energy Office,
community members, businesses, regional, and statewide partners. Additionally, plans will
be developed with the intent to match the growing requirements of federal grants, bonds,
and the needs of business and industry for the City of Spartanburg’s continued economic
growth.
7
Continue to be a leader amongst local government agencies in efforts related to Racial
Equity:
• Sustain membership and affiliation with the Government Alliance on Race and Equity (a
national network of government working to achieve racial equity and advance opportunities
for all).
• Continue to participate and support the Spartanburg Racial Equity Collaborative (A
collaboration of organizations and individuals committed to advancing racial equity in
Spartanburg through strategic efforts focused on listening, learning, collaboration,
reconciliation, and relationship building)
• Sustain our investment and support of initiatives that cultivate the growth of African
American and Minority Businesses: (MWBE/City, Amplify/City, Start-Me/NDG, Power-
Up/One Spartanburg).
• Continue to invest in Community-based Leadership Programs: (Voyagers, Grassroots
Leadership Development Institute, Highland Neighborhood Leadership institute, etc.)
• Continue to maintain and operate community centers in low wealth neighborhoods: (Dr.
TK Gregg, CC Woodson, Thornton)
• Continue to facilitate opportunities that strengthens our residents’ relationship and
understanding of government policies, and operations.: (Citizen Academy and Citizen
Advisory Council).
8
Continue to develop, expand, and improve upon existing agencies and programs, and
funding mechanisms to further provide housing, homeownership, shelter, temporary
housing, or transition housing for all segments of the homeless population including men,
women, youth, elderly, disabled, veterans, and those with mental illnesses and/or
addictions.
Page 4 of 10
Planning Commission - Meeting Minutes – 2023-11-16 Page 4 of 4
9
Work with Spartanburg County, SPATS, and SCDOT and other partners to improve the
community's transportation infrastructure that foster access to job opportunities and
increase families access to a livable wage, provide transportation to essential needs, and
create a robust and safe transportation network throughout the community.
10
The City of Spartanburg will continue to research and deploy smart technology that helps
connect our residents and keep our systems current and secure. To ensure the best quality
of life for our residents the City will work to integrate connected services, such as traffic
systems and app-based communications tools. The City will, as appropriate, investigate
emerging technologies to make sure that our services securely meet the needs of our
residents, businesses, and guests.
Staff presented and discussed the 10 implementation strategies and stated that City Council
requested a One-year Action Plan to be presented by the City Managers Office. Also, the City
Manager’s Office discussed hiring a consultant to update the City’s Zoning Ordinance prior to the
hiring of a Planning Director to get the process started. The estimated date of the Request for
Qualifications will be issued in January.
On a motion by Mr. Spencer and seconded by Mr. Mariani, the Planning Commission
recommended staff schedule a presentation on the status of the Transformation Plans for the
Northside and Highland Neighborhoods by a vote of 7 to 0.
On a motion by Mr. Spencer and seconded by Mr. Brown, the Planning Commission
recommended staff schedule a presentation to learn more about Movement 2030 efforts by a
vote of 7 to 0.
The meeting was adjourned at 7:28 PM.
________________________________
Dr. Phillip Stone, II, Chairman
Page 5 of 10
Planning Department
PO Box 1749 • Spartanburg, SC 29304 • phone: (864) 596-2068 • email: planning@cityofspartanburg.org
website: www.cityofspartanburg.org
MEMORANDUM
TO: Planning Commissioners
FROM: Martin L. Livingston, Jr.
Community Development Director
SUBJECT: The Planning Commission received a request for the Final Development Plan
Approval – 500 W. Main Street and 0 Oxford Road (TMS: 7-12-13- 024.00 and 7-
12-13-001.00) from B -3, General Business District and R6, General Residential
District to B -3, PDD General Business – Planned Development District to
accommodate a mixed -use development. Owner: Richard Pennell, III; P almetto
Operating Company / Applicant: Brett Baumgarten; Coastal Partners, LLC / Danny
Balon, Seamon Whiteside & Associates.
DATE: December 21, 2023
SUMMARY: The project site is an approximately 9.88 acre property at 500 W. Main Street. The
purpose of the rezoning request is f or the development of a mixed use development and reuse of
the Coca Cola facility into commercial and residential apartments in two (2) phases. Staff worked
with the property owners, developers, and civil engineers to review the site plan and discussed the
final site plan requirements for Phase I of the development which includes the commercial mixed
use section of the development.
The history of this project is as follows:
• November 17, 2022: The Planning Commission recommended approval to City Council.
• December 12, 2022: Public hearing with approval at first reading at City Council.
• January 9, 2023: Public hearing with approval at second reading by City Council.
• April 17, 2023: Preliminary Site Plan Review meeting with Site Plan Review Committee.
• October 5, 2023: Final Plan Approval of the site and potential development.
In accordance with Section 507 of the City of Spartanburg Zoning Ordinance, Planned
Development Districts, after the first and second readings of the Ordinance, the City Council shall
approve, deny, table or approve with modifications the plan in concept and the rezoning petition,
subject to the submission of a Final Development Plan to be reviewed by the Planning Commission
at a hearing. This request is for the Planning Commission to review and approve the Final
Development Plan.
NEXT STEPS: Within a maximum of three weeks following the date Final Approval by the
Planning Commission of the Final Development Plan, the applicant shall submit three stamped
and sealed plats of the approved Final Development Plan to the Planning Department who, at the
expense of the developer shall record said Final Plan in the Office of the Register of Mesne
Page 6 of 10
Page 2 of 2
Conveyance. The plat shall be in conformance with Section 507G.(1-8) of the City of Spartanburg
Planned Development District Ordinance and shall show all applicable items.
S
TAFF RECOMMENDATION: Approve the applicant’s request for approval of the Final
Development Plan subject to the attached Conditions of Approval.
CO
NDITIONS OF APPROVAL
B-3, General Business District
Planned Development District (PDD)
Coca Cola Facility Redevelopment Phase I
(Tax Map Number: 7-12-13-024.00 and 7-12-13-001.00)
1. I
f one or more of the following conditions is not met with respect to all its terms, then this
approval may be revoked.
2. A
ll plans for future construction which are not covered by this review shall be submitted to the
City Planning Department for review and approval.
3. A
n updated Plat/survey is required indicating the combining of the property.
4. A
preconstruction meeting is required with Buddy Bush, the City’s Building Official, and Jay
Squires, the City’s Storm Water Manager, before any site work can begin on the property. Mr.
Bush can be reached at bbush@cityofspartanburg.org or (864) 596-2111 and Mr. Squires can
be reached at jsquires@cityofspartanburg.org or (864) 596- 2089 to schedule the
preconstruction meeting.
Page 7 of 10
VAN
SITE OVERVIEW
COKE FACILITY REDEVELOPMENT PHASE 1
SPARTANBURG, SOUTH CAROLINA
TMS# 7-12-13-024.00, 7-12-13-001.00
OWNER/DEVELOPER:
PALMETTO OPERATING COMPANY, LLC
101 E WASHINGTON ST, SUITE 400
GREENVILLE, SC 29601
CONTACT: BRETT BAUMGARTEN
PHONE: (916) 719-1900
STORM WATER:
CITY OF SPARTANBURG
801 UNION ST
SPARTANBURG, SC 29302
CONTACT: JAY SQUIRES
PHONE: (864) 596-2089
CIVIL ENGINEER & LANDSCAPE ARCHITECT:
SEAMON WHITESIDE & ASSOCIATES, LLC
104 N DANIEL MORGAN AVE, SUITE 300
SPARTANBURG, SC 29301
CONTACT: DANNY BALON, PE
PHONE: (864) 272-1272
SURVEYOR:
EAS PROFESSIONALS, INC.
9 PILGRIM RD
GREENVILLE, SC 29607
CONTACT: JUSTIN KILE
PHONE: (864) 234-7368
PROJECT CONTACTS
WATER SERVICE:
SPARTANBURG WATER
175 N LIBERTY ST
SPARTANBURG, SC 29306
CONTACT: KEVIN SMITH
PHONE: (864) 580-5683
GENERAL NOTES
PROJECT DESCRIPTION
SITE LOCATION MAP
SEWER SERVICE:
SPARTANBURG WATER
175 N LIBERTY ST
SPARTANBURG, SC 29306
CONTACT: JOEL WATSON
PHONE: (864) 580-5683
SHEET REVISION HISTORY#
C1.0
TITLESHEET
A 10/14/22 H 05/04/23
02/16/23B
C 02/21/23
D 03/27/23
E 03/30/23
F 04/12/23
G 04/27/23
05/17/23I
J0 6 / 0 2 / 2 3
SCALE: 1" = 100'
0 50 100 200
S
EW
N
R
Know what's
PROJECT SURVEY INFORMATION AND CONTRACTOR VERIFICATION REQUIREMENTS
1. BOUNDARY, TOPOGRAPHIC, TREE, WETLAND DELINEATION, AND OTHER EXISTING CONDITIONS SHOWN ARE
FROM SURVEY PREPARED BY EAS PROFESIONALS, INC. DATED DECEMBER 16, 2022. THE TOPOGRAPHIC
AND ELEVATION DATA SHOWN HEREON WAS OBTAINED FROM THE REFERENCED SURVEY AND IS NOT
CERTIFIED AS CORRECT BY THIS ENGINEER.
2. PER REFERENCE SURVEY, ALL ELEVATIONS ARE BASED ON NAVD88 VERTICAL DATUM. HORIZONTAL DATUM
IS STATE PLANE (SC NAD83). REFER TO SURVEY FOR BENCHMARK REFERENCE AND/OR LOCATION.
CONTACT OWNER FOR ANY MISSING BOUNDARY PINS, MONUMENTS, OR VERTICAL DATUM BENCHMARKS
NEEDED FOR ESTABLISHING CONSTRUCTION STAKING CONTROL.
3. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL PERIMETER BOUNDARY PROPERTY CORNERS AND
VERIFYING BOUNDARY DATA AGAINST CONSTRUCTION PLANS AND/OR ELECTRONIC FILE INFORMATION
PROVIDED TO THE CONTRACTOR.
4. PRIOR TO STARTING CONSTRUCTION, INCLUDING LAND DISTURBING ACTIVITIES, THE CONTRACTOR IS
RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS, INCLUDING BUT NOT LIMITED TO TOPOGRAPHIC,
TREE, STORM DRAINAGE FACILITIES, AND ALL UTILITIES. EXISTING UTILITIES SHOWN ARE APPROXIMATE AND
HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ENGINEER. THEREFORE, THE CONTRACTOR
IS RESPONSIBLE FOR VERIFYING THE EXACT VERTICAL AND HORIZONTAL LOCATIONS OF ALL EXISTING
UTILITIES. ANY DISCREPANCIES OR CONFLICTS IDENTIFIED DURING VERIFICATION OF EXISTING CONDITIONS
AND UTILITIES SHALL BE REPORTED TO THE OWNER AND ENGINEER. ANY COSTS ASSOCIATED WITH
CORRECTIVE WORK OR DAMAGES THAT ARE A RESULT OF THE CONTRACTOR NOT VERIFYING EXISTING
CONDITIONS AND THE EXACT VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UTILITIES WILL BE
THE CONTRACTOR'S RESPONSIBILITY.
COPYRIGHT c SEAMON, WHITESIDE & ASSOCIATES, INC.THIS DRAWING SHALL NOT BE REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WITHOUT WRITTEN PERMISSION.
GR4714
DB
LM/CS
10/14/22DATE:
501 WANDO PARK BOULEVARD, SUITE 200 | MOUNT PLEASANT, SC 29464 | 508 RHETT STREET, SUITE 101 | GREENVILLE, SC 29601
500 W MAIN ST
CITY OF SPARTANBURG, SOUTH CAROLINA
COKE FACILITY
REDEVELOPMENT PHASE 1
REVISION HISTORY
DRAWN BY:
CHECKED BY:
SW+ PROJECT:
MOUNT PLEASANT, SC
843.884.1667
GREENVILLE, SC
864.298.0534
WWW.SEAMONWHITESIDE.COM
SUMMERVILLE, SC
843.972.0710
SPARTANBURG, SC
864.272.1272
CHARLOTTE, NC
980.312.5450
6/1/23
THIS PROJECT IS A REDEVELOPMENT OF THE EXISTING FACILITIES ON SITE FOR COMMERCIAL MIXED USE
INCLUDING SITE, UTILITY INFRASTRUCTURE, AND STORM DRAINAGE IMPROVEMENTS. THE PROJECT IS
LOCATED ON US HIGHWAY 29 (WEST MAIN STREET) IN THE CITY OF SPARTANBURG, SOUTH CAROLINA.
PLANNING:
CITY OF SPARTANBURG
440 S CHURCH ST
SPARTANBURG, SC 29306
CONTACT: MARTIN LIVINGSTON
PHONE: (864) 580-5323
ENERGY SERVICE:
DUKE ENERGY
920 BEAUMONT AVE
SPARTANBURG, SC 29303
CONTACT: STEVEN PRYOR
PHONE: (864) 948-5610
GAS SERVICE:
PIEDMONT NATURAL GAS
4720 PIEDMONT ROW DRIVE
CHARLOTTE, NC 28210
CONTACT: DEE DEE HANKS
PHONE: (704) 364-3120
PRICING DRAWINGSA 10/14/2022
COKE REDEVELOPMENT PHASE 1
INDEX
C1.0 TITLESHEET
C1.1 GENERAL NOTES
C2.0 OVERALL EXISTING CONDITIONS
C2.1 EXISTING CONDITIONS
C2.2 DEMOLITION PLAN
C3.0 EROSION CONTROL PHASE 1 PLAN
C3.1 EROSION CONTROL PHASE 2 PLAN
C3.2 EROSION CONTROL PHASE 3 PLAN
C4.0 EROSION CONTROL DETAILS (1 OF 2)
C4.1 EROSION CONTROL DETAILS (2 OF 2)
C5.0 OVERALL SITE PLAN
C5.1 SITE PLAN
C5.2 SCDOT DRIVEWAY PLAN
C5.3 LIFE SAFETY PLAN
C6.0 GRADING PLAN
C7.0 DRAINAGE PLAN
C7.1 DRAINAGE PROFILES
C8.0 UTILITY PLAN - WATER
C8.1 UTILITY PLAN - SEWER
C8.2 SANITARY SEWER PROFILES
C9.0 SITE DETAILS (1 OF 3)
C9.1 SITE DETAILS (2 OF 3)
C9.2 SITE DETAILS (3 OF 3)
C10.0 GRADING & DRAINAGE DETAILS (1 OF 2)
C10.1 GRADING & DRAINAGE DETAILS (2 OF 2)
C11.0 WATER DETAILS
C11.1 SEWER DETAILS
L1.0 LANDSCAPE PLAN
L2.0 PLANT SCHEDULE AND DETAILS
CITY OF SPARTANBURG PERMIT SUBMITTALSB 02/16/2023
SWS FIRE AND SSSD SEWER SUBMITTALC 02/21/2023
SCDOT DRIVEWAY ENCROACHMENT SUBMITTALD 03/27/2023
SPARTANBURG WATER FIRE SUBMITTALE 03/30/2023
CITY OF SPARTANBURG STORM WATER SUBMITTALF 04/12/2023
SSSD SEWER RESUBMITTALG 04/27/2023
SPARTANBURG WATER FIRE RESUBMITTALH 05/04/2023
SCDOT RESUBMITTALI 05/17/2023
CITY OF SPARTANBURG RESUBMITTALJ 06/02/2023
Page 8 of 10
N 66° 01' 57" E
86.48'
S 23° 43' 22" E
53.04'
S 66° 02' 28" W
84.95'
N 25° 23' 31" W
38.36'
S 21° 07' 12" E
(TIE) 21.53'
S 57° 15' 36" E
46.10'
S 65° 44' 37" W 357.56'
N 39° 43' 46" W 163.66'
N 24° 02' 40" W 360.16'
N 06° 37' 36" W
67.42'
N 36° 10' 34" W 161.91'
S 32° 41' 58" W62.58'
N 69° 44' 16" W
103.08'
N 25° 46' 14" W 94.96'
N 25° 39' 52" W 99.96'
N 25° 32' 43" W
49.91'
N 25° 32' 12" W
49.88'
N 26° 02' 01" W29.94'
S 67° 46' 25" W
82.66'
N 03° 34' 47" E
85.11'
N 03° 49' 21" E
45.18'
N 08° 16' 19" E
84.75'
L1L2
S 57° 45' 15" E 205.48'
L3
L4
S 56° 49' 57" E 143.66'
S 57° 48' 23" E 125.24'
S 80° 26' 14" E 274.87'
L5
S 25° 46' 10" E 569.69'
S 17° 35' 34" E
132.25'
CEDAR STREET
15' R/W WIDTH PER PB 2
PG 72
UNIMPROVED
AREA:
4,545 SF
OR 0.10 OF
AN ACRE
N/F: ROSIE MILLER
TMS: 7-12-13-050.00
DB 123-M PG 788
PB 2 PG 71-72
N/F: MARSHALL CLARK ET AL
TMS: 7-12-13-048.00
DB 127-M PG 659
PB 2 PG 71-72
N/F: DEBORAH HOLMES
TMS: 7-12-09-156.00
DB 132-C PG 276
N/F: VICTOR JOSEPH
TMS: 7-12-09-190.00
DB 115-N PG 644
PB 51 PG 664
N/F: CITY OF SPARTANBURG
TMS: 7-12-09-200.00
DB 101-R PG 762
N/F: THE BANKS LAW FIRM PA
TMS: 7-12-13-051.00
DB 129-V PG 870
N/F: PALMETTO
OPERATING COMPANY, LLC
TMS 7-12-13-049.00
DB 130-K PG 599
PB 175 PG 56
N/F: STEPHEN WASHINGTON
TMS: 7-12-13-042.00
DB 122-L PG 874
N/F: CAROLINA INS
& INVESTMENT CO
TMS: 7-12-13-041.00
DB 33-D PG 495
N/F: KAPASI INVESTMENTS, LLC
TMS: 7-12-13-040.00
DB 93-Q PG 778
PB 165 PG 738
N/F: JAMES & LYNN FLYNN
TMS: 7-12-13-035.00
DB 75-U PG 533
PB 177 PG 568
N/F: NEW LIFE MINISTRIES
CHURCH OF SPARTANBURG
TMS: 7-12-13-038.00
DB 70-T PG 575
PB 29 PG 52
N/F: SPANN VENTURES LLC
TMS: 7-12-13-037.00
DB 124-A 569
PB 10 PG 100
N/F: CAPA REAL ESTATE LLC
TMS: 7-12-13-005.00
DB 132-K PG 598
PB 151 PG 360N/F: EARLE CLOWNEY ETAL
TMS: 7-12-13-004.00
DB 64-U PG 668
N/F: MOLLY UZOR
TMS: 7-12-13-003.00
DB 89-R PG 634
PB 134 PG 811
N/F: DAX PROPERTIES LLC
TMS: 7-12-13-002.01
DB 133-L PG 1
PB 92 PG 75
N/F: DAX PROPERTIES LLC
TMS: 7-12-13-002.00
DB 133-L PG 1
PB 92 PG 75
N/F: ETHAN FLOYD
TMS: 7-11-12-313.00
DB 132-C PG 708
PB 135 PG 66
N/F: LAW PETER
TMS: 7-11-12-312.00
DB 114-X PG 845
PB 130 PG 202
N/F: JOSEPH
WILKES,
DAVID MEADOR
& MCKINLEY
WILKES
TMS: 7-11-12-311.00
DB 139-H PG 329
PB 130 PG 202
N/F: MARSHALL CLARK ET AL
TMS: 7-12-13-047.00
DB 127-M PG 659
PB 2 PG 71-72
N/F: JBURKE INVESTMENTS LLC
TMS: 7-12-13-020.00
DB 124-Z PG 405
PB 25-266
6"
W 163.66'
W1 6 3
VAN
EXISTING FACILITY
(PROPOSED MIXED-USE)
W MAIN ST
SC HWY 29
75' R/W PER PB 175 PG 56
OXFORD RD
50' R/W PER PB 175 PG 56
MONK ST
R/W UNKNOWN
WHITEFORD RD
ADA ACCESSIBLE ROUTE
(TYP)
ADA ACCESSIBLE ROUTE
(TYP)
PHASE TWO
(SHOWN FOR REFERENCE ONLY. PHASE 2 DRAWINGS NOT
INCLUDED IN THIS PERMIT SUBMITTAL. PHASE 2 DRAWINGS
TO BE SUBMITTED AT A FUTURE DATE TBD)
PHASE LINE
WATER FEATURE / AMENITY AREA
(DESIGN BY OTHERS - SEE ARCHITECTURAL
DRAWINGS FOR DETAILS)
50' CONSTRUCTION
BUFFER FROMCENTERLINE (TYP)
50' CONSTRUCTIONBUFFER FROM
CENTERLINE (TYP)
RI/RO DRIVEWAY
FULL-ACCESS
DRIVEWAY
PRIVATE DRIVE TO
CONNECT TO OXFORD RD
SUTERA SEMI-INGROUD
TRASH RECEPTACLES (TYP)
TRASH COLLECTION:
COKE BUILDING TRASH TO BE LOCATED WITHIN BUILDING
AND HAULED OFF FROM LOADING AREA
LOADING AREA
ELEVATOR
(BY OTHERS)
C5.0
OVERALL SITE
PLAN
02/16/23B
D 03/27/23
F 04/12/23
05/17/23I
J0 6 / 0 2 / 2 3
COPYRIGHT c SEAMON, WHITESIDE & ASSOCIATES, INC.THIS DRAWING SHALL NOT BE REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WITHOUT WRITTEN PERMISSION.
GR4714
DB
LM/CS
10/14/22DATE:
501 WANDO PARK BOULEVARD, SUITE 200 | MOUNT PLEASANT, SC 29464 | 508 RHETT STREET, SUITE 101 | GREENVILLE, SC 29601
500 W MAIN ST
CITY OF SPARTANBURG, SOUTH CAROLINA
COKE FACILITY
REDEVELOPMENT PHASE 1
REVISION HISTORY
DRAWN BY:
CHECKED BY:
SW+ PROJECT:
MOUNT PLEASANT, SC
843.884.1667
GREENVILLE, SC
864.298.0534
WWW.SEAMONWHITESIDE.COM
SUMMERVILLE, SC
843.972.0710
SPARTANBURG, SC
864.272.1272
CHARLOTTE, NC
980.312.5450
6/1/23
SCALE: 1" = 50'
25 50 1000
S
E
W
N
GENERAL NOTES:
A. ALL DISTURBED AREAS OUTSIDE OF PAVEMENT AREAS ARE TO BE STABILIZED AND
SEEDED IMMEDIATELY AFTER REACHING GRADE. AREAS TO BE
VEGETATED/LANDSCAPED PER LANDSCAPING PLAN.
B. ISLANDS WITHIN PARKING AREA TO BE STABILIZED AND SEEDED DURING
CONSTRUCTION. AREAS TO BE VEGETATED/LANDSCAPED PER LANDSCAPE PLANS.
C. CONTRACTOR TO ENSURE THAT ADA ACCESSIBLE ROUTE MEETS ALL ACCESSIBLE
GUIDELINES.
D. SEE DETAILS FOR ADA RAMP TYPE.
E. ALL CURBING IN FRONT OF SITE FIRE PROTECTION SERVICES (REMOTE FDC AND FIRE
HYDRANTS) SHALL BE BE PAINTED RED WITH NO PARKING IN WHITE TEXT ALONG THE
FACE OF CURB. CONTRACTOR TO COORDINATE WITH CITY OF SPARTANBURG BUILDING
DEPARTMENT.
F. W MAIN STREET STREETSCAPE TO MEET SCDOT SIGHT DISTANCE REQUIREMENTS
SITE PLAN NOTES:
1. ALL EXISTING DRIVEWAYS AND CURB CUTS THAT ARE NOT USED SHALL BE REMOVED
AND REPLACED WITH CONCRETE CURBING, GUTTER, AND/OR SIDEWALK (IF EXISTING).
2. ALL PLANTING AREAS SHALL BE MECHANICALLY IRRIGATED.
3. THE DUMPSTER PAD AND SCREENING SHALL COMPLY WITH CITY STANDARDS AS FOUND
IN SECTION 504.6 AND 505.63 OF THE CITY OF SPARTANBURG ZONING ORDINANCE.
4. ALL HANDICAP SPACES WILL BE MARKED WITH A FREESTANDING OR WALL MOUNTED
SIGN. THE HANDICAP SIGN SHALL BE 7FT IN HEIGHT FROM BOTTOM OF THE SIGN OR
ABOVE DRIVING SURFACE. (SEE DETAIL)
5. ALL SIGNAGE SHALL COMPLY WITH THE CITY OF SPARTANBURG ZONING ORDINANCE.
6. ALL LANDSCAPED AREAS WILL BE DELINEATED BY CURBING.
RETAINING WALLS / DESIGN BUILD:
1. RETAINING WALLS SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR AS A
DESIGN/BUILD COMPONENT OF THE PROJECT. SUBMITTALS SHALL BE SEALED BY A SC
PROFESSIONAL ENGINEER AND SUBMITTED TO THE GEOTECHNICAL ENGINEER FOR
REVIEW. THE DESIGN SHALL ENCOMPASS ALL COMPONENTS AND ASPECTS OF THE
WALL, SUCH AS FOUNDATIONS, TIEBACKS, DRAINAGE PROTECTION (SURFACE AND
GROUNDWATER), AND EROSION PROTECTION. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVIDING PROPER BACKFILL MATERIAL IF THE ON-SITE SOIL IS
UNSUITABLE.
2. THE RETAINING WALL STRUCTURE SHALL BE INSTALLED COMPLETE WITH WATER
REPELLENCY AND FOUNDATION DRAINAGE TO PREVENT EFFLORESCENCE. BOTTOM
ASH SHALL NOT BE PERMITTED IN THE CMU MATERIAL.
3. 42" TALL GUARDRAIL FENCE TO BE INSTALLED ON TOP OF WALL WHERE FALL HEIGHT
EXCEEDS 30" PER IBC.
SCDOT NOTES:
1. ANY WORK BUILT WITHIN THE SCDOT R/W THAT IS NOT BUILT PER THE SCDOT
APPROVED PERMIT AND PLANS IS SUBJECT TO REMOVAL AND REPLACEMENT PER
APPROVED PERMIT AND PLANS AFTER INSPECTION.
2. CONTRACTOR SHALL REFER TO THE APPROVED TRAFFIC SIGNAL PLANS PREPARED BY
TRAFFIC ENGINEER FOR ALL REQUIRED TRAFFIC SIGNAL AND PAVEMENT MARKING
WORK WITHIN SCDOT R/W.
3. THE CONTRACTOR SHALL MARK THE CENTERLINE OF EACH DRIVEWAY IN THE FIELD
AND COMPLETE ANY CLEARING ALONG THE PROPERTY FRONTAGE AS NEEDED. ONCE
MARKED AND THE CLEARING IS COMPLETE, THE CONTRACTOR SHALL NOTIFY SCDOT
TO SCHEDULE A SITE VISIT TO VERIFY COMPLIANCE.
4. ALL PAVEMENT MARKINGS WITHIN SCDOT RIGHT-OF-WAY ARE TO BE THERMOPLASTIC.
ANY PAVEMENT REDONE IN THE SCDOT R.O.W. SHALL MEET SCDOT STANDARDS.
5.
EXISTING UTILITY NOTE:
THE LOCATION OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY
ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS
REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL
EXISTING UTILITIES BEFORE COMMENCING ANY WORK, AND AGREES TO BE FULLY
RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT OCCUR DUE TO THE
CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND
UTILITIES.
STANDARD DUTY ASPHALT
HEAVY DUTY ASPHALT
CONCRETE SIDEWALK
ADA PARKING CONCRETE
HEAVY DUTY CONCRETE
PARKING COUNT
ADA ACCESSIBLE PATH
(CIRCLE ON PATH INDICATES AN AREA IS ACCESSIBLE
W/ MULTIPLE POTENTIAL ROUTES)
SITE LEGEND
09
Page 9 of 10
VAN
357.6' ROAD FRONTAGE
(5) CORF
(5) CORF
(38) Vib mis (28) Vib mis
(3) Dis mnv
(3) Dis mnv
(56) ILVN
(3) Dis mnv
(6) Dis mnv
(6) Dis mnv
(3) Dis mnv
(7) Dis mnv
(14) ILVN
(9) ILVN
(11) Ile sha
(9) Ile sha
(76) LMBB(103) LMBB(117) LMBB(49) LMBB
(31) LMBB
(56) LMBB
(57) LMBB
(37) LMBB
(109) LMBB
(3) Dis mnv(3) Dis mnv
(3) Dis mnv
(19) Dis mnv
(9) Dis mnv
(7) Dis mnv
(7) Dis mnv
(48) LMBB
(5) Dis mnv
(5) Dis mnv
(219) Hem hap
(8) Dis mnv
(54) Hem hap
(39) LMBB
(8) ILVN
(13) ULMB
(2) TAXD
(12) Ace abz
(5) Taxd
(17,600 sf) SOD2
EXISTING VEGETATION TOREMAIN UNTIL PHASE 2
CONSTRUCTION
15' PHASE 2
BUFFERYARD 3
EXISTING VEGETATION TOREMAIN UNDISTURBED
15' PHASE 2
BUFFERYARD 3
(38,000 sf) SEED
(9,100 sf) SEED
6' TALL STOCKADE FENCE(FINISHED SIDE TO FACEPROPERTY ADJOINER)
189.5'
(5) Mag
EXISTING VEGETATION TOREMAIN UNDISTURBED
15 30 60
SCALE: 1" = 30'
0
S
E
W
N
R
Know what's
L1.0
LANDSCAPE
PLAN
A 10/14/22
02/16/23B
D 03/27/23
F 04/12/23
05/17/23I
J0 6 / 0 2 / 2 3
STREET FRONTAGE PLANTING REQUIREMENTS:
•• 358 LF OF ROAD FRONTAGE
1 CANOPY TREE / 100 LF = 4
2 ORNAMENTAL TREES / 100 LF (2 IN PLACE OF CANOPY TREE WHEN NEEDED) = 7
8 SMALL EVERGREEN SHRUBS / 100 LF = 29
STREET FRONTAGE PLANTING PROVIDED:
CANOPY TREE = 3
ORNAMENTAL TREES = 10
SMALL EVERGREEN SHRUBS = 64
EXISTING UTILITY NOTE:
THE LOCATION OF EXISTING UNDERGROUND UTILITIES ARE
SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN
INDEPENDENTLY VERIFIED BY THE OWNER OR ITS
REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE
EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE
COMMENCING ANY WORK, AND AGREES TO BE FULLY
RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT
OCCUR DUE TO THE CONTRACTOR'S FAILURE TO EXACTLY
LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.
NOTES:
1. APPLY 6' DIAMETER MULCH RING TO ALL TREES IN TURF AREAS.
2. SOD/SEED ALL DISTURBED AREAS NOT COVERED BY MULCH,
VEGETATION, OR HARDSCAPE. DO NOT LEAVE BARE SOIL
EXPOSED.
3. NO IRRIGATION COMPONENTS, INCLUDING BUT NOT LIMITED TO,
VALVE BOXES, CONTROL BOXES, BACKFLOW PREVENTERS,
AND/OR RAIN SENSORS ARE ALLOWED TO BE INSTALLED WITHIN
DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY.
4. PLANT QUANTITIES IN PLANT SCHEDULE REPRESENT TOTAL
REQUIRED PLANT MATERIAL BASED ON CITY OF GREER CODE OF
ORDINANCES
5. ALL DISTURBED OPEN SPACE TO BE STABILIZED WITH SEED / SOD
COPYRIGHT c SEAMON, WHITESIDE & ASSOCIATES, INC.THIS DRAWING SHALL NOT BE REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WITHOUT WRITTEN PERMISSION.
GR4714
DB
LM/CS
10/14/22DATE:
501 WANDO PARK BOULEVARD, SUITE 200 | MOUNT PLEASANT, SC 29464 | 508 RHETT STREET, SUITE 101 | GREENVILLE, SC 29601
500 W MAIN ST
CITY OF SPARTANBURG, SOUTH CAROLINA
COKE FACILITY
REDEVELOPMENT PHASE 1
REVISION HISTORY
DRAWN BY:
CHECKED BY:
SW+ PROJECT:
MOUNT PLEASANT, SC
843.884.1667
GREENVILLE, SC
864.298.0534
WWW.SEAMONWHITESIDE.COM
SUMMERVILLE, SC
843.972.0710
SPARTANBURG, SC
864.272.1272
CHARLOTTE, NC
980.312.5450
6/1/23
PHASE LINE
IRRIGATION NOTE:
ALL REQUIRED PLANTING AREAS SHALL BE MECHANICALLY IRRIGATED. THIS
SHALL INCLUDE ALL TREE ISLANDS AND ALL AREAS OF REQUIRED FRONTAGE
LANDSCAPING BETWEEN THE PARKING LOT AND PUBLIC STREETS.
REQUIRED PLANTING AREAS ASSOCIATED WITH PARKING LOTS CONTAINING
LESS THAN THIRTY (30) PARKING SPACES ARE NOT REQUIRED TO BE
IRRIGATED. HOWEVER, AN EXTERIOR WATER SOURCE, SUCH AS A HOSE BIB,
SHALL BE LOCATED WITHIN 100 FEET OF ALL REQUIRED PLANTING AREAS.
PHASE TWO
PHASE ONE
PHASE TWO
PHASE ONE
Page 10 of 10
Source: City of Spartanburg website. First collected Nov 8, 2026.