RecordWell Data

Planning Commission — Agenda Packet

City of Spartanburg · Spartanburg County · Boards and Commissions · meeting of Dec 21, 2023 · Agenda packets

Open the original document More from City of Spartanburg

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

The City of Spartanburg Planning Commission City of Spartanburg | Planning Commission 1 AGENDA December 21, 2023, at 5:30 P.M. City Hall Council Chambers 145 W. Broad Street – Spartanburg, SC 29306 (Please Note: Items as they appear on the docket may or may not be considered in the order as they are presented. The Chair will announce any changes after the roll call) I. Call to Order. II. Roll Call. III. Freedom of Information Act Compliance – Public notification of the Planning Commission meeting has been published, posted and mailed in compliance with the Freedom of Information Act and the requirements of the City of Spartanburg Zoning Ordinance. IV. Approval of Agenda. V. Disposition of Minutes of the November 16, 2023, Meeting. VI. Old Business: None. VII. New Business: 1. Final Development Plan Approval – 500 W. Main Street and 0 Oxford Road (TMS: 7-12-13- 024.00 and 7-12-13-001.00) from B-3, General Business District and R6, General Residential District to B-3, PDD General Business – Planned Development District to accommodate a mixed- use development. Owner: Richard Pennell, III; Palmetto Operating Company / Applicant: Brett Baumgarten; Coastal Partners, LLC / Danny Balon, Seamon Whiteside & Associates. 2. Planning Commission Update – Highland Neighborhood Transformation Plan Progress VIII. Site and Landscape Plans Approved since the November 16, 2023, Meeting: None. IX. City Council Updates since the November 16, 2023, Meeting: None. X. Staff Announcements. XI. Adjournment. For more information, please call Martin L. Livingston, Jr., AICP, CPM, Community Development Director at (864) 580-5323 or by email at planning@cityofspartanburg.org. Page 1 of 10 Planning Commission - Meeting Minutes – 2023-11-16 Page 1 of 4 P lanning Commission Meeting Minutes November 16, 2023 at 5:30 PM City Hall Council Chambers B oard Members Present: Dr. Phillip Stone, Reed Cunningham, Jemar Brown, Santiago Mariani, Kevin DeMark, Warwick Spencer, and Lekesa Whitner. City Staff Present: Martin Livingston, Community Development Director, Nan Zhou, City Planner I I; and Robert Coler, City Attorney. Rolls Ms. W hitner: Lekesa Whitner, Commissioner. Mr. Mariani: Santiago Mariani, Commissioner. Mr. Cunningham: Reed Cunningham, Commissioner. Dr. Stone: Phillip Stone, Commissioner. Mr. Brown: Jemar Brown, Commissioner Mr. Spencer: Warwick Spencer, Commissioner. Mr. DeMark: Kevin DeMark, Commissioner. D r. Stone: Alright, I call the November 16, 2023, meeting of the City of Spartanburg of the Planning Commission to order. My name is Dr. Phillip Stone and I’m the Commission Chair. I will be residing over this meeting this evening. I will note for the record we have all members of the Commission present. The Freedom of Information Act Compliance public notification of this meeting has been published, posted, and mailed in accordance with the Freedom of Information Act and the requirements of the City of Spartanburg Zoning Ordinance. Dr. Stone also welcomed the newest member Kevin DeMark to his first meeting since his appointment. A pproval of meeting agenda O n a motion by Ms. Whitner seconded by Mr. Mariani, the agenda for the meeting was approved, by a vote of 7 to 0. M s. Whitner: I move we accept the agenda. Mr. Mariani: Second. Dr. Stone: Moved by Ms. Whitner and seconded by Mr. Mariani to approve the agenda. All in favor say aye. Attendees: Aye. Dr. Stone: Any opposed? The agenda is approved. The minutes of the August 17, 2023 meeting. Do I hear a motion or any corrections or additions? A pproval of Meeting Minutes for August 17, 2023 On a motion by Mr. Spencer seconded by Ms. Whitner, the minutes of the meeting of August 17, 2023, was approved by a vote of 7 to 0. M r. Spencer: I make a motion that we accept the minutes of the August 17, 203meeting. Ms. Whitner: Second Dr. Phillip: Moved by Mr. Spencer seconded by Ms. Whitner to approve the minutes. All in favor say aye. Attendees: Aye. Page 2 of 10 Planning Commission - Meeting Minutes – 2023-11-16 Page 2 of 4 Dr. Phillip: Any opposed? The Minutes are approved. Old Business: None. New Business: Discussion of Roles and Responsibilities of the Planning Commission and its members. This item may require an Executive Session Pursuant to Section 30-4-70 (a)(2) of the South Carolina Code to Discuss Matters Relating to providing legal advice to the Planning Commission. Mr. Robert Coler recommended that the Planning Commission members request a motion to enter executive session to discuss this matter. On a motion by Mr. Cunningham and seconded by Mr. Mariani, the Planning Commission en tered executive session to discuss Matters Relating to providing legal advice to the Planning Commission by a vote of 7 to 0. On a motion by Mr. Mariani and seconded by Mr. DeMark, the Planning Commission exited executive session. Dr. Stone noted for the record there was no decision made in executive session and no decision made as a result of the discussion in executive session by a vote of 7 to 0. D iscussion on the Comprehensive Plan Implementation Matrix. Comprehensive Plan - Implementation Strategies 1 Update the Zoning Ordinance and Land Use Regulations to support the development of mixed income neighborhoods, increase housing diversity, encourage high-quality mixed-use development along commercial corridors, expand the use of form-based code, and increase density while ensuring neighborhood stability. 2 Continue to support, promote, and invest in initiatives structured to advance the economic mobility of youth and communities, led by our local partners (Spartanburg Academic Movement, Northside Development Group, United Way of the Piedmont, One Spartanburg Inc., Workforce Investment Board, local Colleges, and Universities, etc.), with emphasis on the intersectionality of education, health, housing, workforce, business development, transportation, community-based leadership, and social capital. 3 Encourage and support through regulatory policy, incentives, or financial support compact, mixed-use development that responds to the wants and needs of residents, workers, students, and visitors. While Downtown has— and should continue to have—the greatest mix of uses at the highest intensities, other areas, as shown on the Growth & Conservation Map, are also appropriate. Such areas are intended to complement, not compete with, Downtown. On a smaller scale, neighborhood centers and older retail areas should also accommodate a mix of uses. Page 3 of 10 Planning Commission - Meeting Minutes – 2023-11-16 Page 3 of 4 4 Initiate the process of becoming a nationally accredited parks and recreation agency. A process that aims to build a comprehensive management system of operational best practices, while sustaining high quality, inclusive, and accessible programs, facilities, and events that are influenced and supported by community members. 5 Ensure downtown Spartanburg is welcoming and inclusive for all residents. This could include a range of tools from historic interpretation of the history of Spartanburg from different perspectives, creating amenities and programs that facilitate bringing communities together, and a focus on businesses that are owned by traditionally under- represented populations. Seek input from BIPOC residents to determine what would make downtown feel more welcoming. 6 The City of Spartanburg will develop Sustainability and Resilience Plans to continue to provide the best quality of life for our residents and businesses. These plans will focus on public safety, equity, mitigating natural hazards, and economic development. Plans will be developed in collaboration with the State Office of Resilience, State Energy Office, community members, businesses, regional, and statewide partners. Additionally, plans will be developed with the intent to match the growing requirements of federal grants, bonds, and the needs of business and industry for the City of Spartanburg’s continued economic growth. 7 Continue to be a leader amongst local government agencies in efforts related to Racial Equity: • Sustain membership and affiliation with the Government Alliance on Race and Equity (a national network of government working to achieve racial equity and advance opportunities for all). • Continue to participate and support the Spartanburg Racial Equity Collaborative (A collaboration of organizations and individuals committed to advancing racial equity in Spartanburg through strategic efforts focused on listening, learning, collaboration, reconciliation, and relationship building) • Sustain our investment and support of initiatives that cultivate the growth of African American and Minority Businesses: (MWBE/City, Amplify/City, Start-Me/NDG, Power- Up/One Spartanburg). • Continue to invest in Community-based Leadership Programs: (Voyagers, Grassroots Leadership Development Institute, Highland Neighborhood Leadership institute, etc.) • Continue to maintain and operate community centers in low wealth neighborhoods: (Dr. TK Gregg, CC Woodson, Thornton) • Continue to facilitate opportunities that strengthens our residents’ relationship and understanding of government policies, and operations.: (Citizen Academy and Citizen Advisory Council). 8 Continue to develop, expand, and improve upon existing agencies and programs, and funding mechanisms to further provide housing, homeownership, shelter, temporary housing, or transition housing for all segments of the homeless population including men, women, youth, elderly, disabled, veterans, and those with mental illnesses and/or addictions. Page 4 of 10 Planning Commission - Meeting Minutes – 2023-11-16 Page 4 of 4 9 Work with Spartanburg County, SPATS, and SCDOT and other partners to improve the community's transportation infrastructure that foster access to job opportunities and increase families access to a livable wage, provide transportation to essential needs, and create a robust and safe transportation network throughout the community. 10 The City of Spartanburg will continue to research and deploy smart technology that helps connect our residents and keep our systems current and secure. To ensure the best quality of life for our residents the City will work to integrate connected services, such as traffic systems and app-based communications tools. The City will, as appropriate, investigate emerging technologies to make sure that our services securely meet the needs of our residents, businesses, and guests. Staff presented and discussed the 10 implementation strategies and stated that City Council requested a One-year Action Plan to be presented by the City Managers Office. Also, the City Manager’s Office discussed hiring a consultant to update the City’s Zoning Ordinance prior to the hiring of a Planning Director to get the process started. The estimated date of the Request for Qualifications will be issued in January. On a motion by Mr. Spencer and seconded by Mr. Mariani, the Planning Commission recommended staff schedule a presentation on the status of the Transformation Plans for the Northside and Highland Neighborhoods by a vote of 7 to 0. On a motion by Mr. Spencer and seconded by Mr. Brown, the Planning Commission recommended staff schedule a presentation to learn more about Movement 2030 efforts by a vote of 7 to 0. The meeting was adjourned at 7:28 PM. ________________________________ Dr. Phillip Stone, II, Chairman Page 5 of 10 Planning Department PO Box 1749 • Spartanburg, SC 29304 • phone: (864) 596-2068 • email: planning@cityofspartanburg.org website: www.cityofspartanburg.org MEMORANDUM TO: Planning Commissioners FROM: Martin L. Livingston, Jr. Community Development Director SUBJECT: The Planning Commission received a request for the Final Development Plan Approval – 500 W. Main Street and 0 Oxford Road (TMS: 7-12-13- 024.00 and 7- 12-13-001.00) from B -3, General Business District and R6, General Residential District to B -3, PDD General Business – Planned Development District to accommodate a mixed -use development. Owner: Richard Pennell, III; P almetto Operating Company / Applicant: Brett Baumgarten; Coastal Partners, LLC / Danny Balon, Seamon Whiteside & Associates. DATE: December 21, 2023 SUMMARY: The project site is an approximately 9.88 acre property at 500 W. Main Street. The purpose of the rezoning request is f or the development of a mixed use development and reuse of the Coca Cola facility into commercial and residential apartments in two (2) phases. Staff worked with the property owners, developers, and civil engineers to review the site plan and discussed the final site plan requirements for Phase I of the development which includes the commercial mixed use section of the development. The history of this project is as follows: • November 17, 2022: The Planning Commission recommended approval to City Council. • December 12, 2022: Public hearing with approval at first reading at City Council. • January 9, 2023: Public hearing with approval at second reading by City Council. • April 17, 2023: Preliminary Site Plan Review meeting with Site Plan Review Committee. • October 5, 2023: Final Plan Approval of the site and potential development. In accordance with Section 507 of the City of Spartanburg Zoning Ordinance, Planned Development Districts, after the first and second readings of the Ordinance, the City Council shall approve, deny, table or approve with modifications the plan in concept and the rezoning petition, subject to the submission of a Final Development Plan to be reviewed by the Planning Commission at a hearing. This request is for the Planning Commission to review and approve the Final Development Plan. NEXT STEPS: Within a maximum of three weeks following the date Final Approval by the Planning Commission of the Final Development Plan, the applicant shall submit three stamped and sealed plats of the approved Final Development Plan to the Planning Department who, at the expense of the developer shall record said Final Plan in the Office of the Register of Mesne Page 6 of 10 Page 2 of 2 Conveyance. The plat shall be in conformance with Section 507G.(1-8) of the City of Spartanburg Planned Development District Ordinance and shall show all applicable items. S TAFF RECOMMENDATION: Approve the applicant’s request for approval of the Final Development Plan subject to the attached Conditions of Approval. CO NDITIONS OF APPROVAL B-3, General Business District Planned Development District (PDD) Coca Cola Facility Redevelopment Phase I (Tax Map Number: 7-12-13-024.00 and 7-12-13-001.00) 1. I f one or more of the following conditions is not met with respect to all its terms, then this approval may be revoked. 2. A ll plans for future construction which are not covered by this review shall be submitted to the City Planning Department for review and approval. 3. A n updated Plat/survey is required indicating the combining of the property. 4. A preconstruction meeting is required with Buddy Bush, the City’s Building Official, and Jay Squires, the City’s Storm Water Manager, before any site work can begin on the property. Mr. Bush can be reached at bbush@cityofspartanburg.org or (864) 596-2111 and Mr. Squires can be reached at jsquires@cityofspartanburg.org or (864) 596- 2089 to schedule the preconstruction meeting. Page 7 of 10 VAN SITE OVERVIEW COKE FACILITY REDEVELOPMENT PHASE 1 SPARTANBURG, SOUTH CAROLINA TMS# 7-12-13-024.00, 7-12-13-001.00 OWNER/DEVELOPER: PALMETTO OPERATING COMPANY, LLC 101 E WASHINGTON ST, SUITE 400 GREENVILLE, SC 29601 CONTACT: BRETT BAUMGARTEN PHONE: (916) 719-1900 STORM WATER: CITY OF SPARTANBURG 801 UNION ST SPARTANBURG, SC 29302 CONTACT: JAY SQUIRES PHONE: (864) 596-2089 CIVIL ENGINEER & LANDSCAPE ARCHITECT: SEAMON WHITESIDE & ASSOCIATES, LLC 104 N DANIEL MORGAN AVE, SUITE 300 SPARTANBURG, SC 29301 CONTACT: DANNY BALON, PE PHONE: (864) 272-1272 SURVEYOR: EAS PROFESSIONALS, INC. 9 PILGRIM RD GREENVILLE, SC 29607 CONTACT: JUSTIN KILE PHONE: (864) 234-7368 PROJECT CONTACTS WATER SERVICE: SPARTANBURG WATER 175 N LIBERTY ST SPARTANBURG, SC 29306 CONTACT: KEVIN SMITH PHONE: (864) 580-5683 GENERAL NOTES PROJECT DESCRIPTION SITE LOCATION MAP SEWER SERVICE: SPARTANBURG WATER 175 N LIBERTY ST SPARTANBURG, SC 29306 CONTACT: JOEL WATSON PHONE: (864) 580-5683 SHEET REVISION HISTORY# C1.0 TITLESHEET A 10/14/22 H 05/04/23 02/16/23B C 02/21/23 D 03/27/23 E 03/30/23 F 04/12/23 G 04/27/23 05/17/23I J0 6 / 0 2 / 2 3 SCALE: 1" = 100' 0 50 100 200 S EW N R Know what's PROJECT SURVEY INFORMATION AND CONTRACTOR VERIFICATION REQUIREMENTS 1. BOUNDARY, TOPOGRAPHIC, TREE, WETLAND DELINEATION, AND OTHER EXISTING CONDITIONS SHOWN ARE FROM SURVEY PREPARED BY EAS PROFESIONALS, INC. DATED DECEMBER 16, 2022. THE TOPOGRAPHIC AND ELEVATION DATA SHOWN HEREON WAS OBTAINED FROM THE REFERENCED SURVEY AND IS NOT CERTIFIED AS CORRECT BY THIS ENGINEER. 2. PER REFERENCE SURVEY, ALL ELEVATIONS ARE BASED ON NAVD88 VERTICAL DATUM. HORIZONTAL DATUM IS STATE PLANE (SC NAD83). REFER TO SURVEY FOR BENCHMARK REFERENCE AND/OR LOCATION. CONTACT OWNER FOR ANY MISSING BOUNDARY PINS, MONUMENTS, OR VERTICAL DATUM BENCHMARKS NEEDED FOR ESTABLISHING CONSTRUCTION STAKING CONTROL. 3. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL PERIMETER BOUNDARY PROPERTY CORNERS AND VERIFYING BOUNDARY DATA AGAINST CONSTRUCTION PLANS AND/OR ELECTRONIC FILE INFORMATION PROVIDED TO THE CONTRACTOR. 4. PRIOR TO STARTING CONSTRUCTION, INCLUDING LAND DISTURBING ACTIVITIES, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS, INCLUDING BUT NOT LIMITED TO TOPOGRAPHIC, TREE, STORM DRAINAGE FACILITIES, AND ALL UTILITIES. EXISTING UTILITIES SHOWN ARE APPROXIMATE AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ENGINEER. THEREFORE, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE EXACT VERTICAL AND HORIZONTAL LOCATIONS OF ALL EXISTING UTILITIES. ANY DISCREPANCIES OR CONFLICTS IDENTIFIED DURING VERIFICATION OF EXISTING CONDITIONS AND UTILITIES SHALL BE REPORTED TO THE OWNER AND ENGINEER. ANY COSTS ASSOCIATED WITH CORRECTIVE WORK OR DAMAGES THAT ARE A RESULT OF THE CONTRACTOR NOT VERIFYING EXISTING CONDITIONS AND THE EXACT VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UTILITIES WILL BE THE CONTRACTOR'S RESPONSIBILITY. COPYRIGHT c SEAMON, WHITESIDE & ASSOCIATES, INC.THIS DRAWING SHALL NOT BE REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WITHOUT WRITTEN PERMISSION. GR4714 DB LM/CS 10/14/22DATE: 501 WANDO PARK BOULEVARD, SUITE 200 | MOUNT PLEASANT, SC 29464 | 508 RHETT STREET, SUITE 101 | GREENVILLE, SC 29601 500 W MAIN ST CITY OF SPARTANBURG, SOUTH CAROLINA COKE FACILITY REDEVELOPMENT PHASE 1 REVISION HISTORY DRAWN BY: CHECKED BY: SW+ PROJECT: MOUNT PLEASANT, SC 843.884.1667 GREENVILLE, SC 864.298.0534 WWW.SEAMONWHITESIDE.COM SUMMERVILLE, SC 843.972.0710 SPARTANBURG, SC 864.272.1272 CHARLOTTE, NC 980.312.5450 6/1/23 THIS PROJECT IS A REDEVELOPMENT OF THE EXISTING FACILITIES ON SITE FOR COMMERCIAL MIXED USE INCLUDING SITE, UTILITY INFRASTRUCTURE, AND STORM DRAINAGE IMPROVEMENTS. THE PROJECT IS LOCATED ON US HIGHWAY 29 (WEST MAIN STREET) IN THE CITY OF SPARTANBURG, SOUTH CAROLINA. PLANNING: CITY OF SPARTANBURG 440 S CHURCH ST SPARTANBURG, SC 29306 CONTACT: MARTIN LIVINGSTON PHONE: (864) 580-5323 ENERGY SERVICE: DUKE ENERGY 920 BEAUMONT AVE SPARTANBURG, SC 29303 CONTACT: STEVEN PRYOR PHONE: (864) 948-5610 GAS SERVICE: PIEDMONT NATURAL GAS 4720 PIEDMONT ROW DRIVE CHARLOTTE, NC 28210 CONTACT: DEE DEE HANKS PHONE: (704) 364-3120 PRICING DRAWINGSA 10/14/2022 COKE REDEVELOPMENT PHASE 1 INDEX C1.0 TITLESHEET C1.1 GENERAL NOTES C2.0 OVERALL EXISTING CONDITIONS C2.1 EXISTING CONDITIONS C2.2 DEMOLITION PLAN C3.0 EROSION CONTROL PHASE 1 PLAN C3.1 EROSION CONTROL PHASE 2 PLAN C3.2 EROSION CONTROL PHASE 3 PLAN C4.0 EROSION CONTROL DETAILS (1 OF 2) C4.1 EROSION CONTROL DETAILS (2 OF 2) C5.0 OVERALL SITE PLAN C5.1 SITE PLAN C5.2 SCDOT DRIVEWAY PLAN C5.3 LIFE SAFETY PLAN C6.0 GRADING PLAN C7.0 DRAINAGE PLAN C7.1 DRAINAGE PROFILES C8.0 UTILITY PLAN - WATER C8.1 UTILITY PLAN - SEWER C8.2 SANITARY SEWER PROFILES C9.0 SITE DETAILS (1 OF 3) C9.1 SITE DETAILS (2 OF 3) C9.2 SITE DETAILS (3 OF 3) C10.0 GRADING & DRAINAGE DETAILS (1 OF 2) C10.1 GRADING & DRAINAGE DETAILS (2 OF 2) C11.0 WATER DETAILS C11.1 SEWER DETAILS L1.0 LANDSCAPE PLAN L2.0 PLANT SCHEDULE AND DETAILS CITY OF SPARTANBURG PERMIT SUBMITTALSB 02/16/2023 SWS FIRE AND SSSD SEWER SUBMITTALC 02/21/2023 SCDOT DRIVEWAY ENCROACHMENT SUBMITTALD 03/27/2023 SPARTANBURG WATER FIRE SUBMITTALE 03/30/2023 CITY OF SPARTANBURG STORM WATER SUBMITTALF 04/12/2023 SSSD SEWER RESUBMITTALG 04/27/2023 SPARTANBURG WATER FIRE RESUBMITTALH 05/04/2023 SCDOT RESUBMITTALI 05/17/2023 CITY OF SPARTANBURG RESUBMITTALJ 06/02/2023 Page 8 of 10 N 66° 01' 57" E 86.48' S 23° 43' 22" E 53.04' S 66° 02' 28" W 84.95' N 25° 23' 31" W 38.36' S 21° 07' 12" E (TIE) 21.53' S 57° 15' 36" E 46.10' S 65° 44' 37" W 357.56' N 39° 43' 46" W 163.66' N 24° 02' 40" W 360.16' N 06° 37' 36" W 67.42' N 36° 10' 34" W 161.91' S 32° 41' 58" W62.58' N 69° 44' 16" W 103.08' N 25° 46' 14" W 94.96' N 25° 39' 52" W 99.96' N 25° 32' 43" W 49.91' N 25° 32' 12" W 49.88' N 26° 02' 01" W29.94' S 67° 46' 25" W 82.66' N 03° 34' 47" E 85.11' N 03° 49' 21" E 45.18' N 08° 16' 19" E 84.75' L1L2 S 57° 45' 15" E 205.48' L3 L4 S 56° 49' 57" E 143.66' S 57° 48' 23" E 125.24' S 80° 26' 14" E 274.87' L5 S 25° 46' 10" E 569.69' S 17° 35' 34" E 132.25' CEDAR STREET 15' R/W WIDTH PER PB 2 PG 72 UNIMPROVED AREA: 4,545 SF OR 0.10 OF AN ACRE N/F: ROSIE MILLER TMS: 7-12-13-050.00 DB 123-M PG 788 PB 2 PG 71-72 N/F: MARSHALL CLARK ET AL TMS: 7-12-13-048.00 DB 127-M PG 659 PB 2 PG 71-72 N/F: DEBORAH HOLMES TMS: 7-12-09-156.00 DB 132-C PG 276 N/F: VICTOR JOSEPH TMS: 7-12-09-190.00 DB 115-N PG 644 PB 51 PG 664 N/F: CITY OF SPARTANBURG TMS: 7-12-09-200.00 DB 101-R PG 762 N/F: THE BANKS LAW FIRM PA TMS: 7-12-13-051.00 DB 129-V PG 870 N/F: PALMETTO OPERATING COMPANY, LLC TMS 7-12-13-049.00 DB 130-K PG 599 PB 175 PG 56 N/F: STEPHEN WASHINGTON TMS: 7-12-13-042.00 DB 122-L PG 874 N/F: CAROLINA INS & INVESTMENT CO TMS: 7-12-13-041.00 DB 33-D PG 495 N/F: KAPASI INVESTMENTS, LLC TMS: 7-12-13-040.00 DB 93-Q PG 778 PB 165 PG 738 N/F: JAMES & LYNN FLYNN TMS: 7-12-13-035.00 DB 75-U PG 533 PB 177 PG 568 N/F: NEW LIFE MINISTRIES CHURCH OF SPARTANBURG TMS: 7-12-13-038.00 DB 70-T PG 575 PB 29 PG 52 N/F: SPANN VENTURES LLC TMS: 7-12-13-037.00 DB 124-A 569 PB 10 PG 100 N/F: CAPA REAL ESTATE LLC TMS: 7-12-13-005.00 DB 132-K PG 598 PB 151 PG 360N/F: EARLE CLOWNEY ETAL TMS: 7-12-13-004.00 DB 64-U PG 668 N/F: MOLLY UZOR TMS: 7-12-13-003.00 DB 89-R PG 634 PB 134 PG 811 N/F: DAX PROPERTIES LLC TMS: 7-12-13-002.01 DB 133-L PG 1 PB 92 PG 75 N/F: DAX PROPERTIES LLC TMS: 7-12-13-002.00 DB 133-L PG 1 PB 92 PG 75 N/F: ETHAN FLOYD TMS: 7-11-12-313.00 DB 132-C PG 708 PB 135 PG 66 N/F: LAW PETER TMS: 7-11-12-312.00 DB 114-X PG 845 PB 130 PG 202 N/F: JOSEPH WILKES, DAVID MEADOR & MCKINLEY WILKES TMS: 7-11-12-311.00 DB 139-H PG 329 PB 130 PG 202 N/F: MARSHALL CLARK ET AL TMS: 7-12-13-047.00 DB 127-M PG 659 PB 2 PG 71-72 N/F: JBURKE INVESTMENTS LLC TMS: 7-12-13-020.00 DB 124-Z PG 405 PB 25-266 6" W 163.66' W1 6 3 VAN EXISTING FACILITY (PROPOSED MIXED-USE) W MAIN ST SC HWY 29 75' R/W PER PB 175 PG 56 OXFORD RD 50' R/W PER PB 175 PG 56 MONK ST R/W UNKNOWN WHITEFORD RD ADA ACCESSIBLE ROUTE (TYP) ADA ACCESSIBLE ROUTE (TYP) PHASE TWO (SHOWN FOR REFERENCE ONLY. PHASE 2 DRAWINGS NOT INCLUDED IN THIS PERMIT SUBMITTAL. PHASE 2 DRAWINGS TO BE SUBMITTED AT A FUTURE DATE TBD) PHASE LINE WATER FEATURE / AMENITY AREA (DESIGN BY OTHERS - SEE ARCHITECTURAL DRAWINGS FOR DETAILS) 50' CONSTRUCTION BUFFER FROMCENTERLINE (TYP) 50' CONSTRUCTIONBUFFER FROM CENTERLINE (TYP) RI/RO DRIVEWAY FULL-ACCESS DRIVEWAY PRIVATE DRIVE TO CONNECT TO OXFORD RD SUTERA SEMI-INGROUD TRASH RECEPTACLES (TYP) TRASH COLLECTION: COKE BUILDING TRASH TO BE LOCATED WITHIN BUILDING AND HAULED OFF FROM LOADING AREA LOADING AREA ELEVATOR (BY OTHERS) C5.0 OVERALL SITE PLAN 02/16/23B D 03/27/23 F 04/12/23 05/17/23I J0 6 / 0 2 / 2 3 COPYRIGHT c SEAMON, WHITESIDE & ASSOCIATES, INC.THIS DRAWING SHALL NOT BE REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WITHOUT WRITTEN PERMISSION. GR4714 DB LM/CS 10/14/22DATE: 501 WANDO PARK BOULEVARD, SUITE 200 | MOUNT PLEASANT, SC 29464 | 508 RHETT STREET, SUITE 101 | GREENVILLE, SC 29601 500 W MAIN ST CITY OF SPARTANBURG, SOUTH CAROLINA COKE FACILITY REDEVELOPMENT PHASE 1 REVISION HISTORY DRAWN BY: CHECKED BY: SW+ PROJECT: MOUNT PLEASANT, SC 843.884.1667 GREENVILLE, SC 864.298.0534 WWW.SEAMONWHITESIDE.COM SUMMERVILLE, SC 843.972.0710 SPARTANBURG, SC 864.272.1272 CHARLOTTE, NC 980.312.5450 6/1/23 SCALE: 1" = 50' 25 50 1000 S E W N GENERAL NOTES: A. ALL DISTURBED AREAS OUTSIDE OF PAVEMENT AREAS ARE TO BE STABILIZED AND SEEDED IMMEDIATELY AFTER REACHING GRADE. AREAS TO BE VEGETATED/LANDSCAPED PER LANDSCAPING PLAN. B. ISLANDS WITHIN PARKING AREA TO BE STABILIZED AND SEEDED DURING CONSTRUCTION. AREAS TO BE VEGETATED/LANDSCAPED PER LANDSCAPE PLANS. C. CONTRACTOR TO ENSURE THAT ADA ACCESSIBLE ROUTE MEETS ALL ACCESSIBLE GUIDELINES. D. SEE DETAILS FOR ADA RAMP TYPE. E. ALL CURBING IN FRONT OF SITE FIRE PROTECTION SERVICES (REMOTE FDC AND FIRE HYDRANTS) SHALL BE BE PAINTED RED WITH NO PARKING IN WHITE TEXT ALONG THE FACE OF CURB. CONTRACTOR TO COORDINATE WITH CITY OF SPARTANBURG BUILDING DEPARTMENT. F. W MAIN STREET STREETSCAPE TO MEET SCDOT SIGHT DISTANCE REQUIREMENTS SITE PLAN NOTES: 1. ALL EXISTING DRIVEWAYS AND CURB CUTS THAT ARE NOT USED SHALL BE REMOVED AND REPLACED WITH CONCRETE CURBING, GUTTER, AND/OR SIDEWALK (IF EXISTING). 2. ALL PLANTING AREAS SHALL BE MECHANICALLY IRRIGATED. 3. THE DUMPSTER PAD AND SCREENING SHALL COMPLY WITH CITY STANDARDS AS FOUND IN SECTION 504.6 AND 505.63 OF THE CITY OF SPARTANBURG ZONING ORDINANCE. 4. ALL HANDICAP SPACES WILL BE MARKED WITH A FREESTANDING OR WALL MOUNTED SIGN. THE HANDICAP SIGN SHALL BE 7FT IN HEIGHT FROM BOTTOM OF THE SIGN OR ABOVE DRIVING SURFACE. (SEE DETAIL) 5. ALL SIGNAGE SHALL COMPLY WITH THE CITY OF SPARTANBURG ZONING ORDINANCE. 6. ALL LANDSCAPED AREAS WILL BE DELINEATED BY CURBING. RETAINING WALLS / DESIGN BUILD: 1. RETAINING WALLS SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR AS A DESIGN/BUILD COMPONENT OF THE PROJECT. SUBMITTALS SHALL BE SEALED BY A SC PROFESSIONAL ENGINEER AND SUBMITTED TO THE GEOTECHNICAL ENGINEER FOR REVIEW. THE DESIGN SHALL ENCOMPASS ALL COMPONENTS AND ASPECTS OF THE WALL, SUCH AS FOUNDATIONS, TIEBACKS, DRAINAGE PROTECTION (SURFACE AND GROUNDWATER), AND EROSION PROTECTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING PROPER BACKFILL MATERIAL IF THE ON-SITE SOIL IS UNSUITABLE. 2. THE RETAINING WALL STRUCTURE SHALL BE INSTALLED COMPLETE WITH WATER REPELLENCY AND FOUNDATION DRAINAGE TO PREVENT EFFLORESCENCE. BOTTOM ASH SHALL NOT BE PERMITTED IN THE CMU MATERIAL. 3. 42" TALL GUARDRAIL FENCE TO BE INSTALLED ON TOP OF WALL WHERE FALL HEIGHT EXCEEDS 30" PER IBC. SCDOT NOTES: 1. ANY WORK BUILT WITHIN THE SCDOT R/W THAT IS NOT BUILT PER THE SCDOT APPROVED PERMIT AND PLANS IS SUBJECT TO REMOVAL AND REPLACEMENT PER APPROVED PERMIT AND PLANS AFTER INSPECTION. 2. CONTRACTOR SHALL REFER TO THE APPROVED TRAFFIC SIGNAL PLANS PREPARED BY TRAFFIC ENGINEER FOR ALL REQUIRED TRAFFIC SIGNAL AND PAVEMENT MARKING WORK WITHIN SCDOT R/W. 3. THE CONTRACTOR SHALL MARK THE CENTERLINE OF EACH DRIVEWAY IN THE FIELD AND COMPLETE ANY CLEARING ALONG THE PROPERTY FRONTAGE AS NEEDED. ONCE MARKED AND THE CLEARING IS COMPLETE, THE CONTRACTOR SHALL NOTIFY SCDOT TO SCHEDULE A SITE VISIT TO VERIFY COMPLIANCE. 4. ALL PAVEMENT MARKINGS WITHIN SCDOT RIGHT-OF-WAY ARE TO BE THERMOPLASTIC. ANY PAVEMENT REDONE IN THE SCDOT R.O.W. SHALL MEET SCDOT STANDARDS. 5. EXISTING UTILITY NOTE: THE LOCATION OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING ANY WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT OCCUR DUE TO THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. STANDARD DUTY ASPHALT HEAVY DUTY ASPHALT CONCRETE SIDEWALK ADA PARKING CONCRETE HEAVY DUTY CONCRETE PARKING COUNT ADA ACCESSIBLE PATH (CIRCLE ON PATH INDICATES AN AREA IS ACCESSIBLE W/ MULTIPLE POTENTIAL ROUTES) SITE LEGEND 09 Page 9 of 10 VAN 357.6' ROAD FRONTAGE (5) CORF (5) CORF (38) Vib mis (28) Vib mis (3) Dis mnv (3) Dis mnv (56) ILVN (3) Dis mnv (6) Dis mnv (6) Dis mnv (3) Dis mnv (7) Dis mnv (14) ILVN (9) ILVN (11) Ile sha (9) Ile sha (76) LMBB(103) LMBB(117) LMBB(49) LMBB (31) LMBB (56) LMBB (57) LMBB (37) LMBB (109) LMBB (3) Dis mnv(3) Dis mnv (3) Dis mnv (19) Dis mnv (9) Dis mnv (7) Dis mnv (7) Dis mnv (48) LMBB (5) Dis mnv (5) Dis mnv (219) Hem hap (8) Dis mnv (54) Hem hap (39) LMBB (8) ILVN (13) ULMB (2) TAXD (12) Ace abz (5) Taxd (17,600 sf) SOD2 EXISTING VEGETATION TOREMAIN UNTIL PHASE 2 CONSTRUCTION 15' PHASE 2 BUFFERYARD 3 EXISTING VEGETATION TOREMAIN UNDISTURBED 15' PHASE 2 BUFFERYARD 3 (38,000 sf) SEED (9,100 sf) SEED 6' TALL STOCKADE FENCE(FINISHED SIDE TO FACEPROPERTY ADJOINER) 189.5' (5) Mag EXISTING VEGETATION TOREMAIN UNDISTURBED 15 30 60 SCALE: 1" = 30' 0 S E W N R Know what's L1.0 LANDSCAPE PLAN A 10/14/22 02/16/23B D 03/27/23 F 04/12/23 05/17/23I J0 6 / 0 2 / 2 3 STREET FRONTAGE PLANTING REQUIREMENTS: •• 358 LF OF ROAD FRONTAGE 1 CANOPY TREE / 100 LF = 4 2 ORNAMENTAL TREES / 100 LF (2 IN PLACE OF CANOPY TREE WHEN NEEDED) = 7 8 SMALL EVERGREEN SHRUBS / 100 LF = 29 STREET FRONTAGE PLANTING PROVIDED: CANOPY TREE = 3 ORNAMENTAL TREES = 10 SMALL EVERGREEN SHRUBS = 64 EXISTING UTILITY NOTE: THE LOCATION OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING ANY WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT OCCUR DUE TO THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTES: 1. APPLY 6' DIAMETER MULCH RING TO ALL TREES IN TURF AREAS. 2. SOD/SEED ALL DISTURBED AREAS NOT COVERED BY MULCH, VEGETATION, OR HARDSCAPE. DO NOT LEAVE BARE SOIL EXPOSED. 3. NO IRRIGATION COMPONENTS, INCLUDING BUT NOT LIMITED TO, VALVE BOXES, CONTROL BOXES, BACKFLOW PREVENTERS, AND/OR RAIN SENSORS ARE ALLOWED TO BE INSTALLED WITHIN DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY. 4. PLANT QUANTITIES IN PLANT SCHEDULE REPRESENT TOTAL REQUIRED PLANT MATERIAL BASED ON CITY OF GREER CODE OF ORDINANCES 5. ALL DISTURBED OPEN SPACE TO BE STABILIZED WITH SEED / SOD COPYRIGHT c SEAMON, WHITESIDE & ASSOCIATES, INC.THIS DRAWING SHALL NOT BE REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WITHOUT WRITTEN PERMISSION. GR4714 DB LM/CS 10/14/22DATE: 501 WANDO PARK BOULEVARD, SUITE 200 | MOUNT PLEASANT, SC 29464 | 508 RHETT STREET, SUITE 101 | GREENVILLE, SC 29601 500 W MAIN ST CITY OF SPARTANBURG, SOUTH CAROLINA COKE FACILITY REDEVELOPMENT PHASE 1 REVISION HISTORY DRAWN BY: CHECKED BY: SW+ PROJECT: MOUNT PLEASANT, SC 843.884.1667 GREENVILLE, SC 864.298.0534 WWW.SEAMONWHITESIDE.COM SUMMERVILLE, SC 843.972.0710 SPARTANBURG, SC 864.272.1272 CHARLOTTE, NC 980.312.5450 6/1/23 PHASE LINE IRRIGATION NOTE: ALL REQUIRED PLANTING AREAS SHALL BE MECHANICALLY IRRIGATED. THIS SHALL INCLUDE ALL TREE ISLANDS AND ALL AREAS OF REQUIRED FRONTAGE LANDSCAPING BETWEEN THE PARKING LOT AND PUBLIC STREETS. REQUIRED PLANTING AREAS ASSOCIATED WITH PARKING LOTS CONTAINING LESS THAN THIRTY (30) PARKING SPACES ARE NOT REQUIRED TO BE IRRIGATED. HOWEVER, AN EXTERIOR WATER SOURCE, SUCH AS A HOSE BIB, SHALL BE LOCATED WITHIN 100 FEET OF ALL REQUIRED PLANTING AREAS. PHASE TWO PHASE ONE PHASE TWO PHASE ONE Page 10 of 10

Source: City of Spartanburg website. First collected Nov 8, 2026.