Design Review Board (DRB) — Minutes
City of Spartanburg · Spartanburg County · Boards and Commissions · meeting of Dec 5, 2023 · Minutes
Open the original document More from City of Spartanburg
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
DRB – Meeting Minutes – 2023-12-05
Page 1 of 6
Meeting Minutes of the Design Review Board (DRB)
Tuesday, December 5, 2023, at 5:30 PM
City Council Chambers
The Design Review Board (DRB) on Tuesday, December 5, 2023, at 5:30pm. The following
Board Members were in attendance: Lauren Rogers, Tori Wallace-Babcock, Lucy Lynch,
Alexander Newman, and Lukas Hauser. Representing the City of Spartanburg’s Planning
Department was Martin Livingston, Community Development Director; Nan Zhou, Planner
II; and Tia Keitt, Planner II.
Roll Call:
Ms. Rogers: Lauren Rogers
Ms. Babcock: Tori Wallace-Babcock
Mr. Newman: Alexander Newman
Ms. Lynch: Lucy Lynch
Mr. Hauser: Lukas Hauser
Ms. Lynch: Per the Freedom of Information Act, public notice of this meeting has been
published, posted and mailed in compliance with the Freedom of Information Act and the
requirements of the City of Spartanburg Zoning Ordinance. We have one item on the agenda for
new business and no old business.
Approval of Agenda
On a motion by Ms. Rogers and second by Mr. Newman, the agenda was approved by a
vote of 5 to 0.
Ms. Rogers: Motion to approve.
Mr. Newman: Second
Ms. Lynch: All in favor of approving the amended agenda say aye?
Attendees: Aye.
Ms. Lynch: Okay so the amended agenda is approved. Minutes from October 3rd meeting?
Approval of Meeting Minutes for November 7, 2023
On a motion by Ms. Rogers and second by Mr. Hauser, the minutes was approved by a
vote of 5 to 0.
Ms. Rogers: Motion to approve minutes from November 7, meeting.
Ms. Rogers: Second
Ms. Lynch: All in favor of approving the minutes of the November meeting?
Attendees: Aye.
Old Business: None.
DRB – Meeting Minutes – 2023-12-05
Page 2 of 6
New Business:
DRB-23-020-00008 – The Design Review Board (DRB) has received a request for Full and
Final Approval for the proposed Spartanburg County Public Library – Headquarters
Expansion and Planetarium located in the DT Zone (Civic District) at 151 S. Church Street
(Tax Map Sheet: 7-12-21-074.00). Owner: Spartanburg County Library / Applicant: Adam
Flynn and Sarah Stevens, McMillan Pazdan Smith.
GENERAL PROJECT OVERVIEW
The proposed civic building expansion project is on a 4.99 acre parcel at the corner of Broad
Street and South Church Street.
AUTHORITY
This project is zoned Civic. Formal design review and approval by the Design Review Board is
required.
Because of the unique characteristics of the Civic/Landmark Building, it shall be subject to
Design Review in accordance with Section 2.4. As part of this review process, the applicant may
request modifications from the applicable district standards. However, all such modifications
shall otherwise conform to the general principles for Civic/Landmark buildings below:
• If indicated on the Downtown Master Plan, they must comply with the recommendations
therein.
• They should be sited to terminate a street vista whenever possible and must incorporate
appropriate prominent features, designs, and entrances to celebrate a visual termination.
• They should incorporate detailing and materials that are authentic to the intended style.
• A pedestrian plaza, courtyard, or similar landscaped area may be substituted for a
required building frontage and minimum setback line.
• Building entrances for civic buildings may be raised above the street elevation and
accessed via a monumental stair.
• They should respect the character of the fronting streets through the provision of a
pedestrian-friendly orientation including clear entrances from the street and permeable
street walls with adequate windows (no blank walls).
Preliminary Review was issued on August 1, 2023 with the following conditions:
• Resolution of the streetscape along Broad Street
• Presentation of design suggestions to mitigate the blank wall condition along Broad
Street
DETERMINATION OF COMPLETENESS
• Application complete
EXCEPTIONS
• 3.3.2.a Front Building Setback – Maximum setback of 6 ft – Setbacks range from 7 ft 9 in
to 35 ft
o Approval Granted Previously
DRB – Meeting Minutes – 2023-12-05
Page 3 of 6
• 6.4.4.a Minimize Blank Walls – Expanses of blank walls may not exceed 20 feet in
length – Proposed blank wall along Broad Street is 28 ft
o Conditional Approval Granted Previously Subject to Design Alternatives – See
Commentary
• 6.4.4.c Transparency Zone – Glazing (transparent windows or doors) must extend at least
60% of the total façade width – Proposed glazing along Broad Street is less than 60%
(primarily due to the 28 ft blank wall)
o Approval Previously Granted
• 8.1 Streetscape – Minimum 12 ft zone with trees in wells / preferred 16 ft zone
o Modification Requested
CODE REVIEW
A. Use Standards: The proposed use is permitted by right.
B. District Standards:
• 3.3.1 Lot Configuration: Compliant
• 3.3.2 Primary Building Standards: Maximum setback of 6 ft is proposed to be
exceeded
• 3.3.4 Building Height: Compliant
• 3.3.5 Permitted Parking Location: Not applicable
• 3.3.6 Building Frontage: Shopfront - permitted
C. General Standards:
o 4.1 Civic/Landmark Buildings:
• If indicated on the Downtown Master Plan, they must comply with the
recommendations therein. – Compliant
• They should be sited to terminate a street vista whenever possible and must
incorporate appropriate prominent features, designs, and entrances to celebrate
a visual termination. – Compliant
• They should incorporate detailing and materials that are authentic to the
intended style. – Compliant
• A pedestrian plaza, courtyard, or similar landscaped area may be substituted
for a required building frontage and minimum setback line. – Compliant
• Building entrances for civic buildings may be raised above the street elevation
and accessed via a monumental stair. – Compliant
• They should respect the character of the fronting streets through the provision
of a pedestrian-friendly orientation including clear entrances from the street
and permeable street walls with adequate windows (no blank walls). –
Conditional Exception Granted
D. Lot/Site Standards:
o 5.1.1 Lot Frontage: All lots must front on a street, square, or common open
space. Compliant
DRB – Meeting Minutes – 2023-12-05
Page 4 of 6
o 5.1.2 Corner Lots: Buildings located at street intersections must place the main
building, or part of the building, at the corner. Compliant
o 5.1.3 Pedestrian Entries from Frontage Line: Buildings must have their
principal pedestrian entrances on a frontage line. Compliant
E. Utilities and Trash Containment:
• 5.2.1 Underground Utilities: Compliance presumed
• 5.2.2 Solid Waste Storage Areas: Compliance presumed
• 5.2.3 Mechanical and Utility Equipment: Compliant
F. Building Standards:
• 6.1.1 General Design Principles - Connectivity: Exception Conditionally
Granted
• 6.1.1 General Design Principles - Downtown Should be Urban: Compliant
• 6.1.5 General Design Principles - Put People First: Streetscapes should be
composed of wide sidewalks for walking, seating, public art, and landscaping.
Exception required - see additional comments
• 6.2 Required Building Design Standards:
o 6.2.1 Architectural Style: Compliant
o 6.2.2 Compatibility: Compliant
o 6.2.3 Proportions: Compliant
o 6.2.4 Wall Materials: Compliant
o 6.2.5 Façade Treatment: Compliant
o 6.2.6 Building Entrances: Compliant
• 6.4 Specific Building Design Standards for Mixed-Use and Commercial
Buildings in D-T5
o 6.4.1 Roof and Eaves: Compliant
o 6.4.2 Canopies/Awnings: Compliant
o 6.4.3 Encroachments: Compliant
o 6.4.4 Ground Level Detailing
▪ a. Minimize Blank Walls: Expanses of blank walls may not
exceed 20 feet in length. (A “blank wall” is a facade that does not
contain transparent windows or doors.) - Exception required - see
additional comments
▪ c. Transparency Zone: Glazing must extend from the corner of
the front facade for a depth equal to 60% of the length of the
building Exception granted
o 6.4.5 Materials: Compliant
DRB – Meeting Minutes – 2023-12-05
Page 5 of 6
G. Parking:
• Not Applicable
H. Streetscape and Site Landscaping:
• 8.1 Required Streetscape: 16 ft streetscape zone with a minimum 16 ft sidewalk
and trees planted in wells consistent with downtown standards (40 ft on-center).
Exception required - see additional comments
I. Signage: Not applicable.
ADDITIONAL COMMENTS AND SUGGESTIONS FOR BOARD CONSIDERATION
• Blank Wall Condition along Broad Street: The proposed 25-foot-wide blank wall
along Broad Street contains a stairwell for emergency egress. At their previous meeting,
the DRB expressed concern for the proposed condition and requested that the design
team consider a treatment to mitigate this condition that could consider the following
treatments, or others as appropriate:
o Windows in the stairwell (presumably fire-rated) – an irregular pattern combined
with LED backlighting could make for a very interesting public art element
o Signage structure on which banners advertising library or community events can
be hung
o A vegetative element such as a green screen (vines trained to grow up the wall) or
some foundation plantings
o A public art component (e.g., applied sculpture, lighting, mural, video wall)
The proposed treatment appears to depict a modular brick pattern that breaks the
smoothness of the wall but still utilizes the same brick type and color. We have been told
by the applicant that lighting would also be included but as of this writing were awaiting
the details. In our view, this is a bit too subtle a treatment, at least what we’ve seen thus
far, relative to other blank wall conditions that have been approved by the DRB.
We recommend that the DRB provide further guidance to the applicant and request that
they come back at a later date to review the final design proposal.
• Substandard Streetscape along Broad Street and Church Street: The Broad Street
area is rapidly changing and there is a need to improve the streetscape conditions to
accommodate the future activities along that corridor. The DT-6 calls for a 16-foot-wide
streetscape zone and a 12-foot-wide streetscape zone in DT-5, consistent with the other
frontages along Broad Street. Given how many people we expect to be walking along
Broad Street, specifically to approach the Library expansion, we do believe that the
ideally configuration warrants the DT-6 standard streetscape, However, we do recognize
the existing conditions and believe that the 12 foot streetscape section is the bare
minimum condition with a goal of trying to retrofit as close to the 16 foot-wide
streetscape as possible.
The proposed streetscape condition remains substandard and actually takes a step
backward by removing some of the existing trees that provide a buffer between the
Source: City of Spartanburg website. First collected Nov 8, 2026.