Public Facilities Committee Meeting
Beaufort County, SC
Council Chambers, Administration Building
Beaufort County Government Robert Smalls Complex
100 Ribaut Road, Beaufort
Monday, November 16, 2026
4:00 PM
AGENDA
COMMITTEE MEMBERS:
Logan Cunningham, Chair
Anna Maria Tabernik
Thomas Reitz
David P. Bartholomew, Vice-Chairman
Mark Lawson
Alice Howard, Ex-Officio
1. CALL TO ORDER:
2. PLEDGE OF ALLEGIANCE:
3. STATEMENT OF COMPLIANCE WITH FOIA:
4. APPROVAL OF AGENDA
5. APPROVAL OF MINUTES
● Minutes from October 19, 2026
6. PUBLIC COMMENT PERIOD – 15 MINUTES TOTAL
7. ASSISTANT COUNTY ADMINISTRATOR REPORT
8. AGENDA ITEMS
a. Informational Item: Airport Capital Improvement Program (ACIP) List for Hilton Head Island Airport
(HXD) and Beaufort Executive Airport (ARW). (FISCAL IMPACT: N/A) - Jon Rembold, A.A.E.,
Airports Director (3 min.)
b. A Resolution to accept a South Carolina Aeronautics Commission (SCAC) Entitlement Grant for the
Hilton Head Island Airport (HXD) Leakage and Retention Study — Contingent upon final grant offer.
(FISCAL IMPACT: The proposed total study cost is $11,000, with funding requested as
follows:
SCAC Entitlement Grant: $11,000
Local match: $0
Funding Source: GL 5402-90-0000-57130
Available balance: $6,894,212.83
CONTINGENT UPON FINAL GRANT OFFER) - Jon Rembold, A.A.E., Airports Director (3 min.)
c. A Resolution to Accept a South Carolina Aeronautics Commission (SCAC) Entitlement Grant for
the Hilton Head Island Airport (HXD) Terminal Parking Gate Electrical and Data Infrastructure
Page 1 of 194
Project — Contingent upon the final grant offer. (FISCAL IMPACT: The total project cost is
estimated at $35,905.00, with funding allocated as follows:
SCAC Entitlement Grant: $35,905.00
Local match: $0
Funding Source: GL 5402-90-0000-57130
Balance: $6,894,212.83
CONTINGENT UPON FINAL GRANT OFFER) - Jon Rembold, A.A.E., Airports Director (3 min.)
d. A Resolution to accept a South Carolina Aeronautics Commission (SCAC) Entitlement Grant for the
Hilton Head Island Airport (HXD) Pedestrian and Walkway Bridge Project — Contingent upon final
grant offer. (FISCAL IMPACT: The $125,000 grant to offset the project cost will be allocated
as follows:
SCAC Entitlement Grant: $125,000
Local match: $0
Funding Source: GL 5402-90-0000-57130
Balance: $6,894,212.83
CONTINGENT UPON FINAL GRANT OFFER) - Jon Rembold, A.A.E., Airports Director (3 min.)
e. An Ordinance Authorizing the Acceptance of Robin Way into County Road Inventory (FISCAL
IMPACT: Future impacts could cost below:
• Estimated potential cost for 20-year life cycle for resurfacing/maintenance ≈ $1.7 million
(C-Funds account # 2343-30-0000-54500)) - Bryan Bauer, Director of Engineering
Kelsie Floyd, Right of Way Manager (10 min)
f. An Ordinance Authorizing the County Administrator to Execute the Necessary Documents and
Provide Funding for the Purchase of the 302 Parker Drive for Public Works and Other County
Operations (FISCAL IMPACT:
The purchase price is $X,XXX,XXX, in addition to closing costs. The funding source is the
2025 GO Bonds Fund (Fund 4013), specifically for Renovations to Buildings - 4013-80-1301-
54420, which has an account balance of $25,000,000.
) - Jared Fralix, Assistant County Administrator, 10 minutes
g. A resolution adopting Beaufort County Road Construction Standards and Specifications (FISCAL
IMPACT: There is no fiscal impact to the County at this time.) - Bryan Bauer, PE, Director (5
minutes)
h. Approval of a Resolution to Remove Riley Rd from the 2018 Sales Tax project Broad River-Riley
Rd Sidewalk. (FISCAL IMPACT: Based on not constructing this portion of the project, the net
savings to the County will be $527,418.40) - Bryan Bauer, Director of Engineering (5 min)
i. Approval of a contract to Phillips Paving Company for the Stuart Point Pathway Project
($1,978,701.50) - Contingent upon final SC. Dept of Commerce approval (FISCAL IMPACT:
• Contract fee for materials and construction: $1,798,819.50
• Recommended contingency (10%): $179,882.00
• Total expected project budget: $1,978,701.50
• Funding source: Account No. 4705-80-0000-54500
• Balance of funding account: $17,170,887.18
• Community Block Grant funds: $200,000.00
) - Bryan Bauer, PE - Director of Engineering (5 min)
j. Approval of Contract to J. Bragg Consultants Inc for the 2018 One-Cent Sales Tax Program
Management ($1,445,481.27) (FISCAL IMPACT: Fee for program management services is
Page 2 of 194
$1,314,073.88. Staff recommends a 10% contingency of $131,407.39 for a total budget
request of $1,445,481.27. This total will be funded out of Sales Tax account 4705-80-0000-
54500-PGMNT with a budget of $3,000,000.) - Bryan Bauer, PE — Director of Engineering &
Jared Fralix, PE — Assistant County Administrator Infrastructure (5 min)
k. Approval of a contract to APAC Atlantic, LLC for Asphalt Resurfacing at Bluffton & St. Helena
Convenience Centers ($411,200.57) (FISCAL IMPACT:
• Contract fee for materials and construction: $373,818.70
• Recommended contingency (10%): $37,818.70
• Total expected project budget: $411,200.57
• Funding source: Account No. 4013-80-1340-54500 (240S02)
• Balance of funding account: $836,222.00
) - Bradley Harriott, 5 min
9. ADJOURNMENT
To watch committee or County Council meetings or for a complete list of agendas and backup packages,
please visit: https://beaufortcountysc.gov/council/council-committee-meetings/index.html
Page 3 of 194
Public Facilities Committee Meeting
Beaufort County, SC
Council Chambers, Administration Building
Beaufort County Government Robert Smalls Complex
100 Ribaut Road, Beaufort
Monday, October 19, 2026
4:00 PM
MINUTES
Watch the video stream available on the County's website to hear the Council’s discussion of a specific topic or
the complete meeting https://beaufortcountysc.new.swagit.com/videos/404301
1. Call to Order
Committee Chair Cunningham called the meeting to order at 4:23 PM
Present
Committee Chair Logan Cunningham
Committee Vice-Chair David Bartholomew - @ 4:32 PM
Committee Member Mark Lawson
Committee Member Thomas Reitz - Virtual
Ex-Officio Alice Howard
Committee Member Anna Maria Tabernik
Council Member Paula Brown
Council Gerald Dawson
Council Member York Glover
Council Member Joseph Passiment
Absent
Council Member Lawrence McElynn
2. Pledge of Allegiance
Committee Chair Cunningham led the Pledge of Allegiance.
3. Statement of Compliance with FOIA
Committee Chair Cunningham stated that public notification of this meeting had been published, posted,
and distributed in compliance with SC FOIA.
4. Approval of Agenda
Motion: It was moved by Council Member Dawson, seconded by Committee Member Lawson to
approve the agenda.
The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Member Lawson, Committee
Member Reitz, Ex-Officio Howard, Committee Member Tabernik, Council Member Brown, Council
Member Dawson, Council Member Glover, and Council Member Passiment. The motion passed 9:0.
Page 4 of 194
5. Approval of Minutes
Motion: It was moved by Committee Member Lawson, seconded by Committee Member Tabernik to
approve the minutes from August 17, 2026, and September 21, 2026.
The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Member Lawson, Committee
Member Reitz, Ex-Officio Howard, Committee Member Tabernik, Council Member Brown, Council
Member Dawson, Council Member Glover, and Council Member Passiment. The motion passed 9:0.
6. Public Comment Period
No public comments were taken.
7. Assistant County Administrator Report
a. Event Communication: Creep on Composting
Bradley Harriott updated the committee on the first Creep on Compost in the County.
b. SC Litter Association: Litter Award
Bradley Harriott brought forward a member of the Beaufort County Litter Control for the award they
won from Palmetto Pride.
c. Alljoy Drainage Study Results (for information only)
Ryne Phillips, Director of Water Resources, Seamon Whiteside, presented a PowerPoint of the Alljoy
Drainage Study Results.
d. Clerk of Court Renovations Discussion
8. Agenda Items
a. Update on Stormwater Utility Fee Study and Restructure - Jared Fralix, Assistant County
Administrator (30 min)
Taylor Brewer, Stormwater Program Manager, provided an update on the Stormwater Utility Fee Study
and Restructure. Please watch the video stream on the county's website to view the full update.
https://beaufortcountysc.new.swagit.com/videos/404301
b. Marine Project Prioritization Discussion (FISCAL IMPACT: There is no fiscal impact at this
time. This is for discussion only.) - Bryan Bauer, PE, Director or Engineering (5 Minutes)
Motion: It was moved by Committee Member Tabernik, seconded by Ex-Officio Howard to put the item
on the floor for discussion.
Bryan Bauer, Director of Engineering, presented a spreadsheet to the committee about the
prioritization of the marine projects in the county. Please watch the video stream on the county's
website to view the full discussion. https://beaufortcountysc.new.swagit.com/videos/404301
c. BC Connect App | One Year Service Progress Report (FISCAL IMPACT: No Fiscal Impact) -
Jared Fralix and Bradley Harriott, 10 minutes
Motion: It was moved by Council Member Dawson, seconded by Committee Vice-Chair Bartholomew to
put the item on the floor for discussion.
Bradley Harriott, Public Works Director, provided an update on the BC Connect App. Please watch the
Page 5 of 194
video stream on the county's website to view the full report.
https://beaufortcountysc.new.swagit.com/videos/404301
d. Approval of a Resolution for a Memorandum of Agreement (MOA) with the Town of Bluffton for the
Construction of Holly Hill Road (FISCAL IMPACT:
The estimated construction cost is not expected to exceed $2,000,000. The County’s
obligation will cover 50 percent of the overall project cost, capped at $1,000,000. This
amount will be funded by account 2005-60-0000-54420, which currently has a balance of
$1,284,520.00.
) - Jared Fralix, Assistant County Administrator (5 min)
Motion: It was moved by Committee Member Tabernik, seconded by Committee Member Lawson to
approve a Resolution for a Memorandum of Agreement (MOA) with the Town of Bluffton for the
Construction of Holly Hill Road.
The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Vice-Chair Bartholomew,
Committee Member Lawson, Committee Member Reitz, Ex-Officio Howard, Committee Member
Tabernik, Council Member Brown, Council Member Dawson, Council Member Glover, and Council
Member Passiment. The motion passed 10:0.
e. Approval of a Contract to O'Quinn Marine Construction for Broad River Boat Landing floating dock
replacement ($217,500) (FISCAL IMPACT: The contract fee for materials and construction is
$197,500.00. Staff recommends a 10% contingency of $19,750.00 for a total requested
budget of $217,250.00. The funding for this project is from Broad River Boat Ramp
Improvement Project A/H award, account # 2001-10-0000-57130-RIVER, with a balance of
$400,000.00.) - Bryan Bauer, PE, (5 minutes)
Motion: It was moved by Ex-Officio Howard, seconded by Council Member Dawson to approve a
contract to O'Quinn Marine Construction for Broad River Boat Landing floating dock replacement
($217,500).
The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Vice-Chair Bartholomew,
Committee Member Lawson, Committee Member Reitz, Ex-Officio Howard, Committee Member
Tabernik, Council Member Brown, Council Member Dawson, Council Member Glover, and Council
Member Passiment. The motion passed 10:0.
f. Approval of a Contract to Nix Construction for the construction of the Bailey Memorial Park
Project ($1,982,400.00). (FISCAL IMPACT: A Contract to Nix Construction for the
construction of the Bailey Memorial Park Project ($1,982,400.00) (FISCAL IMPACT: The
contract fee is for the construction of the Bailey Memorial Park in the amount of
$1,652,000.00 plus a 20% contingency ($330,400.00), bringing the total request to
$1,982,400.00. The funding for this project will be from the 2025 GO Bond in the GL account
4013-80-1610-54420 in the amount of ($1,982,400.00) and the account balance is
($5,940,912.00). ) - Ron Lewis, Facilities Management Project Manager II, (5 mins)
Motion: It was moved by Committee Member Lawson, seconded by Committee Member Tabernik to
approve a contract to Nix Construction for the construction of the Bailey Memorial Park Project
($1,982,400.00).
The Vote - Voting Yea: Committee Vice-Chair Bartholomew, Committee Member Lawson, Committee
Member Reitz, Ex-Officio Howard, Committee Member Tabernik, Council Member Brown, Council
Member Dawson, Council Member Glover, and Council Member Passiment.
Voting Nay: Committee Chair Cunningham. The motion passed 9:1.
Page 6 of 194
g. Approval of a contract award to Nix Construction Inc. for the design and build of a Pedestrian
Walkway and Bridge Project at the Hilton Head Island Airport ($243,000.00) (FISCAL IMPACT:
The South Carolina Aeronautics Commission (SCAC) will fund 100% of the total cost
($243,000.00) of the Pedestrian Walkway and Bridge Project through an Entitlement Grant.
Funding Source: GL 5402-90-0000-57130
Balance: $10,325,948.44
CONTINGENT UPON FINAL SCAC GRANT APPROVAL (anticipated 11/2026)) - Jon Rembold,
Airports Director, 3 minutes
Motion: It was moved by Committee Member Tabernik, seconded by Committee Member Lawson to
approve a contract award to Nix Construction Inc. for the design and build of a Pedestrian Walkway and
Bridge Project at the Hilton Head Island Airport ($243,000.00).
The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Vice-Chair Bartholomew,
Committee Member Lawson, Committee Member Reitz, Ex-Officio Howard, Council Member Brown,
Council Member Dawson, Council Member Glover, and Council Member Passiment. The motion passed
9:0.
* Committee Member Tabernik stepped out
h. Approval of Change Orders 1 and 2 for Beaufort Executive Airport Hangar Construction Project -
Site Development ($288,393.61) (FISCAL IMPACT: The total value of Change Orders No. 1
and No. 2 is $288,393.61, increasing the contract amount from $1,982,494.99 to
$2,270,888.60.
The change orders will be charged to airport funds under the following account:
GL Code: 5102-90-0000-57130 | SCAC Grant - Current Balance: $1,157,357.73
GL Code: 5100-90-0000-54100 | ARPA Grant - Current Balance: $1,019,233.48
) - Jon Rembold, Airports Director, 3 minutes
Motion: It was moved by Committee Vice-Chair Bartholomew, seconded by Committee Member
Lawson to approve of Change Orders 1 and 2 for Beaufort Executive Airport Hangar Construction
Project- Site Development ($288,393.61).
The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Vice-Chair Bartholomew,
Committee Member Lawson, Committee Member Reitz, Ex-Officio Howard, Committee Member
Tabernik, Council Member Brown, Council Member Dawson, Council Member Glover, and Council
Member Passiment. The motion passed 10:0.
i. Approval of Task Order to McSweeney Design for the Melrose Ferry Dock Replacement Design
($946,962.50) (FISCAL IMPACT: The contract amount will be $860,875.00 to McSweeney
Engineers. Staff recommends a 10% contingency for a total budget request of $946,962.50
to come from account # 2002-10-0000-54500-CIP which has a current amount of
$1,432,085.00, and account 4000-80-1243-54500-27007 which has an amount of $150,000.) -
Bryan Bauer, P.E., ENV SP, Director (5 minutes)
Motion: It was moved by Committee Member Lawson, seconded by Committee Member Tabernik to
approve a Task Order to McSweeny Design for the Melrose Ferry Dock Replacement Design
($946,962.50).
The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Vice-Chair Bartholomew,
Committee Member Lawson, Committee Member Reitz, Ex-Officio Howard, Committee Member
Tabernik, Council Member Brown, Council Member Dawson, Council Member Glover, and Council
Member Passiment. The motion passed 10:0.
Page 7 of 194
j. Approval of change order to Parrish & Partners for the Burnt Church Pathway ($63,936) (FISCAL
IMPACT: The change order for additional engineering services for redesign of a portion of
the project sidewalk is $58,126. Staff recommends a 10% contingency of $5,810 for a total
budget increase of $63,936. The funding for this project is from Account No. 4705-80-0000-
54500 PTHWY with a current balance of $17,226,840.32) - Bryan Bauer, Director of Engineering
(5 min)
Motion: It was moved by Council Member Brown, seconded by Committee Member Lawson to approve
a change order to Parrish & Partners for the Burnt Church Pathway ($63,936).
The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Vice-Chair Bartholomew,
Committee Member Lawson, Committee Member Reitz, Ex-Officio Howard, Committee Member
Tabernik, Council Member Brown, Council Member Dawson, Council Member Glover, and Council
Member Passiment. The motion passed 10:0.
k. Approval of a Resolution authorizing the County Administrator to pursue condemnation for a
portion of a parcel as specified on EXHIBIT “A” associated with right of way acquisition for Lady’s
Island Middle School Access Road as part of the 2018 One Cent Referendum. (FISCAL IMPACT:
Condemnation expenses range from $5,000 - $15,000 plus owner compensation for R/W.
The compensation for the parcel is specified on attached EXHIBIT “A” as $465,700. The
condemnation will be funded by 2018 One Cent Referendum Account # 4705-80-0000-54500-
LIMP with a current balance of $26,099,305.22.) - Bryan Bauer, PE, Director of Engineering (5
min)
Motion: It was moved by Committee Member Tabernik, seconded by Ex-Officio Howard to approve a
Resolution authorizing the County Administrator to pursue condemnation for a portion of a parcel as
specified on EXHIBIT "A" associated with the right of way acquisition for Lady's Island Middle School
Road Access Road as part of the 2018 Once Cent Referendum.
The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Member Lawson, Committee
Member Reitz, Ex-Officio Howard, Committee Member Tabernik, Council Member Brown, Council
Member Dawson, Council Member Glover, and Council Member Passiment.
Voting Nay: Committee Vice-Chair Bartholomew. The motion passed 9:1.
9. Adjournment
Ratified:
Page 8 of 194
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
INFORMATIONAL ITEM: AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP) LIST FOR HILTON HEAD ISLAND
AIRPORT (HXD) AND BEAUFORT EXECUTIVE AIRPORT (ARW).
MEETING NAME AND DATE:
Public Facilities Committee November 16, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
N/A
PRESENTER INFORMATION:
Jon Rembold, A.A.E., Airports Director (3 min.)
ITEM BACKGROUND:
The National Airports Capital Improvement Plan is an internal FAA document that serves as the primary
planning tool for identifying and prioritizing critical airport development and associated capital needs for the
National Airspace System. Each year the FAA requests a project list from each airport that receives project
funding. This is an informational update to brief Council on the ARW and HXD lists.
FISCAL IMPACT:
N/A
APPROVAL HISTORY:
This item was presented to the Airports Board at the meeting on November 5, 2026.
Page 9 of 194
FY28 - FY32 Capital Improvement Plan
LOC ID
ARW Project Funding Plan
FAA Fiscal
Year Project Name and Brief Description
NEPA Submission
date
Pavement
Rehabilitation
Projects Insert PCI Total Project Cost
Fed Share
AIP Entitlements AIG Funding
ATP/FCT
Funding
State
Participation
Sponsor
Participation PFC Funds
Additional Funds
Requested
Funds Cross check
(Should equal zero)
Entitlement Carryover $150,000 $268,520
NPE Funding $150,000
Planned 2027 Partial Parallel Taxiway (without significant wetland impact) - Construction Beaufort Executive
Airport Finding of No
Significant Impact/Record
of Decision for Phase I
Projects Reevaluation
(August 2025)
$6,238,013 $5,614,212 $300,000 $268,520 $311,901 $311,901 $5,045,692 $0.00
Resealing Existing T-Hangar Roof (SCAC) $0 $0
Entitlement Carryover $0 $0
NPE Funding $150,000
2028 Ramp Rehabilitation and Expansion (Design and Bidding) Beaufort Executive
Airport Finding of No
Significant Impact/Record
of Decision for Phase I
Projects Reevaluation
(August 2025)
$156,800 $141,120 $150,000 $7,840 $7,840 -$8,880 $0.00
ALP Update $450,000 $405,000 $0 $22,500 $22,500 $405,000 $0.00
Entitlement Carryover $0 $0
NPE Funding $150,000
2029 Ramp Rehabilitation (Construction) $150,000 $0 $0 -$150,000 $0.00
Perimeter Fencing and Gates (Design-Bidding) $0 $0 $0 $0 $0.00
Entitlement Carryover $0 $0
NPE Funding $150,000
2030 Ramp Expansion (Construction) $2,083,275 $1,874,948 $150,000 $104,164 $104,164 $1,724,948 $0.00
Expand Automobile Parking Lot $0 $0 $0 $0 $0.00
Entitlement Carryover $0 $0
NPE Funding $150,000
2031 Old Runway Rehabilitation and Aircraft Parking $1,319,875 $1,187,888 $150,000 $65,994 $65,994 $1,037,888 $0.00
Perimeter Fencing and Gates (Construction) $0 $0 $0 $0 $0.00
Entitlement Carryover $0 $0
NPE Funding $150,000
2032 RSA 07/25 (Design and Bidding) $771,530 $694,377 $150,000 $38,577 $38,577 $544,377 $0.00
** Add additional rows as needed
Check project eligibility (AIP Handbook)
Page 10 of 194
FY28 - FY32 Capital Improvement Plan
LOC ID
HXD Project Funding Plan
FAA Fiscal Year Project Name and Brief Description
NEPA Submission
date
Pavement
Rehabilitation
Projects Insert PCI Total Project Cost
Fed Share
AIP Entitlements AIG Funding ATP/FCT Funding
State
Participation
Sponsor
Participation PFC Funds
Additional Funds
Requested
Funds Cross check
(Should equal zero)
Entitlement Carryover $842,100 $913,640 $1,263,584
NPE Funding $1,300,000 $250,000
Planned 2027 Runway 03/21 Rehabilitation (Design and Bidding) $377,350 $339,615 $339,615 $0 $37,735 $0 $0 $0.00
26, 28, 30, 32 Hunter and 154 Beach City demolition (SCAC) $300,000 $300,000 $0
26 Hunter design documents (SCAC) $250,000 $250,000 $0
03/21 EMAS Seal Replacement (SCAC) $300,000 $300,000 $0
Parking Gates Design (SCAC) $31,000 $31,000
Entitlement Carryover $1,802,485 $913,640 $594,849
NPE Funding $1,300,000 $250,000
2028 Land Acquisition Reimbursement (Parcels R510 008 000 0307 0000 [30 Hunter Road], R510
004 000 0323 0000 [32 Hunter Road]) - Terminal Area Development
$3,325,820 $2,993,238 $2,079,598 $913,640 $332,582 $0 $0 $0.00
Commercial Service Terminal Phase II (Repackaging, Bidding, and Construction $46,329,632 $10,000,000 $10,000,000 $0 $0 $36,329,632
Recapturing displaced thresholds and departure surface clearing Environmental
Documentation
$350,000 $315,000 $315,000 $0 $35,000 $0 $0 $0.00
Entitlement Carryover $707,887 $477,267
NPE Funding $1,300,000 $250,000
2029 Recapturing displaced thresholds and departure surface clearing (Design and Bidding) $164,700 $148,230 $148,230 $16,470 $0 $0 $0.00
03/21 EMAS Seal Replacement (SCAC) $300,000 $0 $0 $300,000 $0 $0 $0.00
Entitlement Carryover $1,859,657 $0 $410,797
NPE Funding $1,300,000 $250,000
2030 Runway 03/21 Rehabilitation (Construction) $4,952,900 $4,457,610 $3,159,657 $495,290 $0 $1,297,953 $0.00
Recapturing displaced thresholds and departure surface clearing (Construction) $2,580,430 $2,322,387 $0 $165,507 $92,537 $2,322,387 $0.00
Entitlement Carryover $0 $0 $0
NPE Funding $1,300,000 $250,000
2031 Address Modifications to Standards (1) $10,336,005 $9,302,405 $1,300,000 $250,000 $783,600 $8,002,405 $0.00
Taxiway F Relocation (Design-Bidding) $1,649,400 $1,484,460 $0 $0 $164,940 $1,484,460 $0.00
Entitlement Carryover $0 $0 $0
NPE Funding $1,300,000 $250,000
2032 Address Modifications to Standards (2) $10,431,315 $9,388,184 $1,300,000 $250,000 $793,132 $8,088,183 $0.00
Entitlement Carryover $0 $0 $0
NPE Funding $1,300,000 $250,000
2033 Taxiway F Relocation (Construction) $25,841,900 $23,257,710 $1,300,000 $250,000 $2,334,190 $21,957,710 $0.00
** Add additional rows as needed
Check project eligibility (AIP Handbook)
Page 11 of 194
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
A RESOLUTION TO ACCEPT A SOUTH CAROLINA AERONAUTICS COMMISSION (SCAC) ENTITLEMENT GRANT
FOR THE HILTON HEAD ISLAND AIRPORT (HXD) LEAKAGE AND RETENTION STUDY — CONTINGENT UPON FINAL
GRANT OFFER.
MEETING NAME AND DATE:
Public Facilities Committee November 16, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of a resolution to accept a SCAC Entitlement Grant in the amount of $11,000 for
the HXD Leakage and Retention Study — Contingent upon the final grant offer.
PRESENTER INFORMATION:
Jon Rembold, A.A.E., Airports Director (3 min.)
ITEM BACKGROUND:
HXD seeks to better understand air travel demand generated by its catchment area and determine how much
of that demand uses HXD versus competing airports, particularly Savannah/Hilton Head International Airport.
Passenger counts at HXD alone do not capture travelers who use other airports. The proposed study will
estimate total catchment-area demand and passenger retention and leakage; profile destination markets and
airline shares; and provide supporting tables and maps. The findings will support airline recruitment, retention
and expansion discussions, identify opportunities to recapture passengers, and guide airport marketing and air
service planning, including efforts to strengthen year-round connectivity. The proposed scope includes a
review of available ticketing and U.S. Department of Transportation origin-and-destination data, or agreed-
upon equivalent sources, for a mutually agreed-upon 12-month period. Deliverables include an electronic
draft report, a final PDF report with supporting tables and maps, and one findings review with Airport staff.
FISCAL IMPACT:
The proposed total study cost is $11,000, with funding requested as follows:
SCAC Entitlement Grant: $11,000
Local match: $0
Funding Source: GL 5402-90-0000-57130
Available balance: $6,894,212.83
CONTINGENT UPON FINAL GRANT OFFER
APPROVAL HISTORY:
The Airports Board recommended approval of the Resolution to accept the SCAC grant at the monthly meeting
on November 5, 2026.
Page 12 of 194
RESOLUTION 2026/
A RESOLUTION TO ACCEPT A SOUTH CAROLINA AERONAUTICS
COMMISSION (SCAC) ENTITLEMENT GRANT FOR THE HILTON HEAD
ISLAND AIRPORT (HXD) LEAKAGE AND RETENTION STUDY - CONTINGENT
UPON FINAL GRANT OFFER
WHEREAS, HXD seeks to better understand air travel demand generated by its
catchment area, including the extent to which travelers use HXD or competing airports,
particularly Savannah/Hilton Head International Airport; and
WHEREAS, HXD proposes to conduct an air service development leakage and
retention study to estimate catchment-area travel demand, measure passenger retention and
leakage, and profile destination markets and airline shares; and
WHEREAS, the study will provide market data to support airline recruitment, retention
and expansion discussions, identify opportunities to recapture passengers, and guide airport
marketing and air service planning, including efforts to strengthen year-round connectivity; and
WHEREAS, HXD has applied to SCAC requesting 100% Commercial Service Airport
Entitlement Funds in the amount of $11,000 to fund professional consulting services for the
Leakage and Retention Study; and
NOW, THEREFORE, BE IT RESOLVED that Beaufort County Council, duly
assembled, does hereby authorize the acceptance of a SCAC entitlement grant in the amount of
$11,000 for the HXD Leakage and Retention Study, contingent upon the final SCAC grant
offer.
Adopted this ____ day of __________, 2026
COUNTY COUNCIL OF BEAUFORT COUNTY
BY:
Alice Howard, Chairman
ATTEST:
Sarah W. Brock, Clerk to Council
Page 13 of 194
1
PROJECT GRANT APPLICATION
(State Aid for Development of Public Airports)
SCAC Grant No: ____
(Leave blank – For SCAC Use only) Date
PART I - PROJECT INFORMATION
Grant Type being Requested (Check one):
2.5% State match of 95% AIP / AIG Grant
5% State match of 90% AIP
50% Terminal Building Development Grant (NTE $500,000)
60% State – Local Airport Development Grant
75% State – Local Airport Maintenance Grant
85% Non-NPIAS / Un classified, publicly owned, Airport Maintenance or Development
Grant
90% NPIAS Airport Secondary Runway Redevelopment Grant
100% Commercial Service Airport Entitlement Funds
100% Commercial Service Special Allocation
100% Distribution of Earmarked Funds
The (Airport Sponsor) ____________
(herein called the “Sponsor” ) hereby makes appl ication to the South Carolina Aeronautics
Commission (herein designated “SCAC") for a grant of State funds pursuant to applicable statutes,
regulations, and policies, for the purpose of aiding in financing a project (herein called the "Project")
for the development of the (Airport Name) _________ (herein called the
"Airport") located in the County of (County Name) ________ in the State of South
Carolina.
It is proposed that the project consist of the following described airport development (Insert brief
project description / title below):
all as more particularly described in the plans and specifications separately submitted to SCAC on
(Date) , which are made a part hereof by reference.
If applicable, please list numbers of all associated AIP / AIG Grant(s): ________________________
________________________________________________________________________________
(Note: AIP State Match Grants will not be issued in advance of their associated Federal Grant(s).
10/13/2026
Hilton Head Island Airport (HXD)
Beaufort
Hilton Head Island Airport
None
Hilton Head Island Airport request Entitlement Funds to conduct an air service development Leakage study to
understand the details of out market and catchment area. The data will aid in developing targeted airline
recruitment packages, marketing and advertising targets and other air service future efforts.
Page 14 of 194
2
PART II - REPRESENTATIONS
The Sponsor hereby represents and certifies as follows:
1. Legal Authority. The Sponsor has the legal power and authority:
(A) To do all things necessary to undertake and carryout the Project in
conformity with the applicable statues, regulations, and policies;
(B) To accept, receive and disburse grant funds from the State of South Carolina
in aid of the project on the terms and conditions stated in the applicable
statutes, regulations, policies, and proposed grant agreement, and;
2. Funds. The Sponsor now has on deposit $ _______ for
use in defraying the costs of the Project. The present status of these funds is as
follows:
The Sponsor hereby designates (insert name and job title of staff member):
Name: ____
Title: __________________________________________
to receive payments representing SCAC's share of the Project costs.
Printed Name of Sponsoring Agency's Representative
Signature of Sponsoring Agency's Representative
Representative Title
Please list the full name, title, and complete USPS mailing address of the authorized person to
whom the Grant offer and agreement should be mailed:
Name, Title: __________________________________________________
Address: _____________________________________________________
__________________________________________________________
Airport Finance Manager
Brian Cronin
Stephen J Parry
Deputy Airport Director
Jon Rembold, Airport Director
26 Hunter Road
Hilton Head Island SC 29926
Page 15 of 194
3
ATTACHMENT A
THE FOLLOWING IS A SUMMARY OF THE ACTUAL PROJECT COSTS:
ITEM
TOTAL COST
SPONSOR'S SHARE
OF COST
FEDERAL SHARE
OF COST
STATE SHARE OF
COST
AMOUNT AMOUNT AMOUNT
1. PLANNING COST
2. LAND COST
3. CONSTRUCTION COST
4. ENGINEERING COST
5. ADMINISTRATIVE COST
6. MISCELLANEOUS
7. TOTAL ALL ACTUAL
PROJECT COSTS
Rules for Reimbursing Project Costs Prior to the Grant Execution Date:
Unless specifically recommended by the Executive Director and approved in advance by the Commission, all
project costs must be incurred after the execution date of the Airport Development or Aviation Education
grant. Exceptions to this rule include:
Land or avigation easement acquisitions
Airfield facility emergencies not covered by insurance
Project exceptions identified in the relevant section of the FAA’s AIP Handbook
This policy does not prohibit grant amendments for change orders that arise during construction, provided
they are communicated with SCAC Airport Development staff in advance and approved by Commission.
$11,000
$11,000
$11,000
$11,000
Page 16 of 194
4
ATTACHMENT B
DOCUMENTATION SUPPORT
1. Is this project a result of facility requirements determined by a Master Plan, Airport Layout Plan (ALP),
the South Carolina Airport System Plan, or a revision to the ALP? ______Yes _______No
If so, indicate FAA or SCAC approval date:
2. Does this project require environmental study / documentation under the National Environmental
Policy Act of 1969 (NEPA)? Yes No
3. If so, please indicate the document type and its status:
Categorical Exclusion (CatEx)
Environmental Assessment (EA) _____________________________________________
Environmental Impact Statement (EIS)
4. Have all previous projects that involved federal and / or state funds been completed?
Yes No (List all Open Federal and State Grants below)
________________________________________________________________________________
_________________________________________________________________________________
5. If the State is unable to participate to the extent requested, what is the Sponsor's ability to fund a
share greater than the State match?
6. Name of Regional Planning Council which airport is located:
7. Has Federal Application Form 424 been submitted to the Inter -agency Council on Public
Transportation (State Clearinghouse) in accordance with Section 57-3-1050?
________Yes No
8. The following action has been taken by the local governing body to provide steps toward protective
zoning of the airspace and land surrounding the airport. Describe actions by the Sponsor and
governing body related to land use planning and zoning ordinances.
9. Anticipated date construction or planning / design project is to commence:
Start Date: Ending Date:
X
X
X
None
Lowcountry Council Of Governments
NA
NA
Please see the attached Grant list.
January 2027
January 2028
Page 17 of 194
5
ATTACHMENTS
Project information and Justification Statement
Federal and State outstanding grant list.
Bid tabulation (Construction projects) or appropriate cost data
Professional Services Work Authorization / Task Order
Copy of signed Federal Application Form 424 (if this request is associated with an FAA AIP /
AIG Grant)
Copy of executed Federal AIRPORT INFRASTRUCTURE GRANT AGREEMENT (if this request is
associated with an FAA AIP / AIG Grant)
Earmarked Funds spending plan
Project Environmental Documentation (Categorical Exclusion – CatEx) if required
(Revised: September 6, 2026)
Page 18 of 194
HHH Leakage and Retention Study | 1
Leakage and Retention Study
Hilton Head Island Airport (HHH) | Scope of Work and Funding Justification
Requested funding $11,000 in state entitlement funds for professional consulting services.
Purpose and justification
Hilton Head Island Airport requests funding for a leakage and retention study to quantify the air travel demand
generated by its catchment area and determine how much of that demand uses HHH versus competing
airports, particularly Savannah/Hilton Head International Airport. Airport passenger counts alone do not
capture travelers using other airports. The study will provide market evidence for airline recruitment, retention
and expansion discussions, identify passenger recapture opportunities, and guide airport marketing and air
service planning, including efforts to strengthen year-round connectivity. The requested expenditure is for
airport-specific research and analysis supporting these activities.
Scope of work
1 Define the market Confirm the catchment area and competing airports with Airport staff; prepare a ZIP
code catchment map, population and sample summary, and drive time map.
2 Estimate travel demand Analyze Airport Research Center (ARC) ticketing data and applicable US DOT origin
and destination data, or agreed equivalent sources, for the latest mutually agreed available 12-month period.
Document sources, sample coverage, extrapolation methods and limitations.
3 Measure retention and leakage Estimate total catchment demand and the passengers and percentage
retained at HHH or using competing airports, separating domestic and international travel.
4 Profile destinations and airlines Rank destination markets and airline shares; report estimated origin and
destination passengers, passengers per day each way, average fares and passenger revenue metrics where
supported by the data. Include resident and visitor shares where supportable and detail for HHH and principal
competing airports.
5 Report findings Summarize results and implications for airport air service development and passenger
recapture. Provide tables and maps supporting and illustrating the data for use by HHH.
Deliverables and cost
An electronic draft report, final PDF report with supporting tables and maps, and one findings review with
Airport staff. Proposed total fee: $11,000, including required data acquisition and normal project expenses,
subject to consultant confirmation. Study period, completion schedule and any seasonal breakout will be
agreed before authorization.
Page 19 of 194
HHH Leakage and Retention Study | 2
Draft Consultant Task Order
Hilton Head Island Airport Leakage and Retention Study
Task order number [Insert] Date [Insert]
Owner [Airport sponsor legal name]
Consultant [Consultant legal name]
Governing agreement [Agreement title and effective date]
Authorization and services
Upon execution and written notice to proceed by the Owner, the Consultant shall perform the scope of work
on the preceding page, incorporated into this task order. Before commencing analysis, the parties shall confirm
the catchment area, comparison airports, data sources and 12-month study period. The Consultant shall
disclose material data limitations and distinguish estimates from observed values.
Deliverables and review
The Consultant shall submit an electronic draft report for one consolidated Owner review, address comments
within the agreed scope, deliver the final PDF report and supporting tables and maps, and conduct one
findings review with Airport staff. The Owner shall provide available airport information and timely decisions
on study parameters and draft comments. Final acceptance will be based on completion of the agreed scope
and deliverables.
Schedule
Notice to proceed [Date] Draft report [Date] Final report [Date]
The parties shall agree on these dates before execution. Schedule changes require written agreement.
Compensation and payment
Proposed lump sum fee: $11,000, including professional services, required data acquisition and normal project
expenses, subject to Consultant confirmation before execution. Payment shall follow the governing agreement
and the following agreed billing schedule: [Insert]. The Consultant shall identify this task order and services
completed on each invoice. Compensation shall not exceed $11,000 without a written amendment approved
by the Owner.
Scope changes and agreement terms
Seasonal or monthly breakouts, additional survey work, and other services beyond the stated scope require
agreement on inclusion in the $11,000 fee or a written amendment before work begins. This task order is
subject to the governing agreement, including its applicable insurance, records, confidentiality and payment
provisions. Applicable state funding conditions shall be incorporated before execution.
Acceptance
Owner authorized representative
Signature __________________________ Date __________
Name and title _____________________________________
Consultant authorized representative
Signature __________________________ Date __________
Name and title _____________________________________
Page 20 of 194
Federal Grant # Description Grant ID Award Amount
64 Acquire Land for Development-28 Hunter Rd-Reimbursement 34500300642026 $ 1,358,322.00
63 Acquire Land for Development-26 Hunter Rd-Reimbursement 34500300632026 1,819,043.00
62 Taxiway F ROFA 34500300622025 306,022.00
61 Air Traffic Control Tower 34500300612025 300,000.00
60 Drainage Construction 34500300602025 1,390,569.00
59 SJBC Relocation EA (FAA AIP) 34500300592024 325,679.00
57 ALP Study (FAA BIL AIG) 34500300572024 825,757.00
56 ATP (BIL) 34500300562024 5,000,000.00
State Grant # Description Grant ID Award Amount
SCAC 23-025 SCAC 23-025-Taxiway F Strengthening SCAC 23-025 $ 378,044.00
SCAC 24-025 Perform Terminal Improvement SCAC 24-025 750,000.00
SCAC 23-029 Terminal Construction Project SCAC 23-029 12,000,000.00
All Grants Summary - Updated 10/13/2026
Page 21 of 194
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
A RESOLUTION TO ACCEPT A SOUTH CAROLINA AERONAUTICS COMMISSION (SCAC) ENTITLEMENT GRANT
FOR THE HILTON HEAD ISLAND AIRPORT (HXD) TERMINAL PARKING GATE ELECTRICAL AND DATA
INFRASTRUCTURE PROJECT — CONTINGENT UPON THE FINAL GRANT OFFER.
MEETING NAME AND DATE:
Public Facilities Committee November 16, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of a resolution to accept a SCAC Entitlement Grant in the amount of $35,905 for
the HXD Terminal Parking Gate Electrical and Data Infrastructure Project — Contingent upon the final grant
offer.
PRESENTER INFORMATION:
Jon Rembold, A.A.E., Airports Director (3 min.)
ITEM BACKGROUND:
HXD continues to experience increased demand for terminal parking due to growth in passenger traffic, rental
car operations, and airport staffing. The existing terminal parking facilities and infrastructure present
operational challenges in managing vehicle entry, exit, and parking access. HXD has engaged a professional
parking management contractor to implement and operate an improved terminal parking management
system. Dedicated electrical power and data connectivity at the parking access gates are needed to support
reliable equipment operation and access control. The proposed project will install the required electrical and
data infrastructure throughout the terminal parking facilities. These improvements are expected to enhance
operational efficiency, strengthen access management, improve the reliability of parking transactions, support
effective management of available parking resources, and protect an important airport revenue source.
FISCAL IMPACT:
The total project cost is estimated at $35,905.00, with funding allocated as follows:
SCAC Entitlement Grant: $35,905.00
Local match: $0
Funding Source: GL 5402-90-0000-57130
Balance: $6,894,212.83
CONTINGENT UPON FINAL GRANT OFFER
APPROVAL HISTORY:
The Airports Board recommended approval of the Resolution to accept the SCAC grant at the monthly meeting
on November 5, 2026.
Page 22 of 194
RESOLUTION 2026/
A RESOLUTION TO ACCEPT A SOUTH CAROLINA AERONAUTICS COMMISSION
(SCAC) ENTITLEMENT GRANT FOR THE HILTON HEAD ISLAND AIRPORT (HXD)
TERMINAL PARKING GATE ELECTRICAL AND DATA INFRASTRUCTURE
PROJECT - CONTINGENT UPON FINAL GRANT OFFER
WHEREAS, HXD continues to experience increased demand for terminal parking as a
result of growth in passenger enplanements, rental car operations, and airport staffing; and
WHEREAS, the existing terminal parking facilities and infrastructure present operational
challenges in managing vehicle entry, exit, and overall parking access; and
WHEREAS, HXD has engaged a professional parking management contractor to
implement and operate an improved terminal parking management system, which requires dedicated
electrical power and data connectivity at the parking access gates to support reliable operation and
access control; and
WHEREAS, the proposed Terminal Parking Gate Electrical and Data Infrastructure Project
will provide the necessary electrical and data infrastructure to support the parking gate equipment,
enhance operational efficiency, strengthen access management, improve the reliability of parking
transactions, and support effective management of airport parking resources; and
WHEREAS, HXD has applied to SCAC requesting 100% Commercial Service Airport
Entitlement Funds in the amount of $35,905 to offset the cost of installing the required electrical
and data infrastructure; and
NOW, THEREFORE, BE IT RESOLVED that Beaufort County Council, duly
assembled, does hereby authorize the acceptance of a SCAC entitlement grant in the amount of
$35,905 for the HXD Terminal Parking Gate Electrical and Data Infrastructure Project, contingent
upon the final SCAC grant offer.
Adopted this ____ day of __________, 2026
COUNTY COUNCIL OF BEAUFORT COUNTY
BY:
Alice Howard, Chairman
ATTEST:
Sarah W. Brock, Clerk to Council
Page 23 of 194
1
PROJECT GRANT APPLICATION
(State Aid for Development of Public Airports)
SCAC Grant No: ____
(Leave blank – For SCAC Use only) Date
PART I - PROJECT INFORMATION
Grant Type being Requested (Check one):
2.5% State match of 95% AIP / AIG Grant
5% State match of 90% AIP
50% Terminal Building Development Grant (NTE $500,000)
60% State – Local Airport Development Grant
75% State – Local Airport Maintenance Grant
85% Non-NPIAS / Un classified, publicly owned, Airport Maintenance or Development
Grant
90% NPIAS Airport Secondary Runway Redevelopment Grant
100% Commercial Service Airport Entitlement Funds
100% Commercial Service Special Allocation
100% Distribution of Earmarked Funds
The (Airport Sponsor) ____________
(herein called the “Sponsor” ) hereby makes appl ication to the South Carolina Aeronautics
Commission (herein designated “SCAC") for a grant of State funds pursuant to applicable statutes,
regulations, and policies, for the purpose of aiding in financing a project (herein called the "Project")
for the development of the (Airport Name) _________ (herein called the
"Airport") located in the County of (County Name) ________ in the State of South
Carolina.
It is proposed that the project consist of the following described airport development (Insert brief
project description / title below):
all as more particularly described in the plans and specifications separately submitted to SCAC on
(Date) , which are made a part hereof by reference.
If applicable, please list numbers of all associated AIP / AIG Grant(s): ________________________
________________________________________________________________________________
(Note: AIP State Match Grants will not be issued in advance of their associated Federal Grant(s).
10/13/2026
Hilton Head Island Airport (HXD)
Beaufort
Hilton Head Island Airport
None
Hilton Head Island Airport request Entitlement Funds for parking lot gate electrical and data facilty construction.
Total between 4 invoices/quotes $35,905
Page 24 of 194
2
PART II - REPRESENTATIONS
The Sponsor hereby represents and certifies as follows:
1. Legal Authority. The Sponsor has the legal power and authority:
(A) To do all things necessary to undertake and carryout the Project in
conformity with the applicable statues, regulations, and policies;
(B) To accept, receive and disburse grant funds from the State of South Carolina
in aid of the project on the terms and conditions stated in the applicable
statutes, regulations, policies, and proposed grant agreement, and;
2. Funds. The Sponsor now has on deposit $ _______ for
use in defraying the costs of the Project. The present status of these funds is as
follows:
The Sponsor hereby designates (insert name and job title of staff member):
Name: ____
Title: __________________________________________
to receive payments representing SCAC's share of the Project costs.
Printed Name of Sponsoring Agency's Representative
Signature of Sponsoring Agency's Representative
Representative Title
Please list the full name, title, and complete USPS mailing address of the authorized person to
whom the Grant offer and agreement should be mailed:
Name, Title: __________________________________________________
Address: _____________________________________________________
__________________________________________________________
Airport Finance Manager
Brian Cronin
Stephen J Parry
Deputy Airport Director
Jon Rembold, Airport Director
26 Hunter Road
Hilton Head Island SC 29926
Page 25 of 194
3
ATTACHMENT A
THE FOLLOWING IS A SUMMARY OF THE ACTUAL PROJECT COSTS:
ITEM
TOTAL COST
SPONSOR'S SHARE
OF COST
FEDERAL SHARE
OF COST
STATE SHARE OF
COST
AMOUNT AMOUNT AMOUNT
1. PLANNING COST
2. LAND COST
3. CONSTRUCTION COST
4. ENGINEERING COST
5. ADMINISTRATIVE COST
6. MISCELLANEOUS
7. TOTAL ALL ACTUAL
PROJECT COSTS
Rules for Reimbursing Project Costs Prior to the Grant Execution Date:
Unless specifically recommended by the Executive Director and approved in advance by the Commission, all
project costs must be incurred after the execution date of the Airport Development or Aviation Education
grant. Exceptions to this rule include:
Land or avigation easement acquisitions
Airfield facility emergencies not covered by insurance
Project exceptions identified in the relevant section of the FAA’s AIP Handbook
This policy does not prohibit grant amendments for change orders that arise during construction, provided
they are communicated with SCAC Airport Development staff in advance and approved by Commission.
$35,905
$35,905
$35,905
$35,905
Page 26 of 194
4
ATTACHMENT B
DOCUMENTATION SUPPORT
1. Is this project a result of facility requirements determined by a Master Plan, Airport Layout Plan (ALP),
the South Carolina Airport System Plan, or a revision to the ALP? ______Yes _______No
If so, indicate FAA or SCAC approval date:
2. Does this project require environmental study / documentation under the National Environmental
Policy Act of 1969 (NEPA)? Yes No
3. If so, please indicate the document type and its status:
Categorical Exclusion (CatEx)
Environmental Assessment (EA) _____________________________________________
Environmental Impact Statement (EIS)
4. Have all previous projects that involved federal and / or state funds been completed?
Yes No (List all Open Federal and State Grants below)
________________________________________________________________________________
_________________________________________________________________________________
5. If the State is unable to participate to the extent requested, what is the Sponsor's ability to fund a
share greater than the State match?
6. Name of Regional Planning Council which airport is located:
7. Has Federal Application Form 424 been submitted to the Inter -agency Council on Public
Transportation (State Clearinghouse) in accordance with Section 57-3-1050?
________Yes No
8. The following action has been taken by the local governing body to provide steps toward protective
zoning of the airspace and land surrounding the airport. Describe actions by the Sponsor and
governing body related to land use planning and zoning ordinances.
9. Anticipated date construction or planning / design project is to commence:
Start Date: Ending Date:
X
X
X
None
Lowcountry Council Of Governments
NA
See attached all open Federal and State Grant List
October 2026
November 2026
Page 27 of 194
5
ATTACHMENTS
Project information and Justification Statement
Federal and State Open Grants
Bid tabulation (Construction projects) or appropriate cost data
Professional Services Quotes/ Work Authorization / Task Order
Copy of signed Federal Application Form 424 (if this request is associated with an FAA AIP /
AIG Grant)
Copy of executed Federal AIRPORT INFRASTRUCTURE GRANT AGREEMENT (if this request is
associated with an FAA AIP / AIG Grant)
Earmarked Funds spending plan
Project Environmental Documentation (Categorical Exclusion – CatEx) if required
(Revised: September 6, 2026)
Page 28 of 194
Hilton Head Island Airport
State Entitlement Funding Request
Project Title: Terminal Parking Gate Electrical and Data Infrastructure
Project Description and Justification
Hilton Head Island Airport (HXD) continues to experience increased demand for terminal
parking as a result of growth in passenger enplanements, rental car operations, and airport
staffing. The existing terminal parking facilities, with their aging layout and infrastructure, pose
operational challenges for managing vehicle entry and exit and overall parking access.
To address these challenges, the airport has engaged a professional parking management
contractor to implement and operate an improved terminal parking management system. A
critical component of this system is the installation of dedicated electrical power and data
connectivity at each parking access gate to support reliable operation and access control.
The proposed project will provide the necessary electrical and data infrastructure to support
the parking gate equipment throughout the terminal parking facilities. These improvements will
enhance operational efficiency, strengthen access management, improve the reliability of
parking transactions, and support the airport's ability to effectively manage its available parking
resources.
The airport is requesting its allocated South Carolina Aeronautics Commission (SCAC) State
Entitlement Funds to offset the cost of installing the required electrical and data infrastructure.
The accompanying contractor quotations identify the anticipated installation costs associated
with providing these essential services to each parking gate location.
This investment represents a necessary infrastructure improvement that supports the airport's
parking management operations, protects an important airport revenue source, and provides a
foundation for continued improvements to the terminal parking system.
Page 29 of 194
Federal Grant # Description Grant ID Award Amount
64 Acquire Land for Development-28 Hunter Rd-Reimbursement 34500300642026 $ 1,358,322.00
63 Acquire Land for Development-26 Hunter Rd-Reimbursement 34500300632026 1,819,043.00
62 Taxiway F ROFA 34500300622025 306,022.00
61 Air Traffic Control Tower 34500300612025 300,000.00
60 Drainage Construction 34500300602025 1,390,569.00
59 SJBC Relocation EA (FAA AIP) 34500300592024 325,679.00
57 ALP Study (FAA BIL AIG) 34500300572024 825,757.00
56 ATP (BIL) 34500300562024 5,000,000.00
State Grant # Description Grant ID Award Amount
SCAC 23-025 SCAC 23-025-Taxiway F Strengthening SCAC 23-025 $ 378,044.00
SCAC 24-025 Perform Terminal Improvement SCAC 24-025 750,000.00
SCAC 23-029 Terminal Construction Project SCAC 23-029 12,000,000.00
All Grants Summary - Updated 10/13/2026
Page 30 of 194
ESTIMATE
Quality Connections, LLC
6013 Vaux Rd
Beaufort, SC 29906-9473
qualityconnectionsllc@gmail.com
+1 (843) 592-1540
Bill to
DAN NEESON
HILTON HEAD AIRPORT
Ship to
DAN NEESON
HILTON HEAD AIRPORT
Estimate details
Estimate no.: 1689
Estimate date: 09/15/2026
# Date Product or service Description Qty Rate Amount
1. Services 3/4 pipe 25 $15.00 $375.00
2. Services CAT 6 WIRE 1 $160.00 $160.00
3. Services GROUNDING & BOXES 1 $100.00 $100.00
4. Services UBIQUITI POINT TO POINT SYSTEM
AND MOUNTS
1 $350.00 $350.00
5. Services LABOR 1 $2,500.00 $2,500.00
Note to customer
-RUNNING CONNECTIONS FOR POINT-TO-POINT CONNECTIONS
SYSTEM TO WEST GATE
-RUNNING DATA CONNECTION FROM FIRST GATE TO SECOND
GATE
Total $3,485.00
Accepted date Accepted by
to k e n =
Page 31 of 194
INVOICE
Quality Connections, LLC
6013 Vaux Rd
Beaufort, SC 29906-9473
qualityconnectionsllc@gmail.com
+1 (843) 592-1540
Bill to
DAN NEESON
HILTON HEAD AIRPORT
Ship to
DAN NEESON
HILTON HEAD AIRPORT
Invoice details
Invoice no.: 1512
Terms: Net 30
Invoice date: 10/08/2026
Due date: 11/07/2026
# Date Product or service Description Qty Rate Amount
1. Services 3/4 pipe 5 $15.00 $75.00
2. Services CAT 6 WIRE 1 $160.00 $160.00
3. Services BOXES 1 $50.00 $50.00
4. Services UBIQUITI POINT TO POINT SYSTEM
AND MOUNTS
1 $350.00 $350.00
5. Services LABOR 1 $1,600.00 $1,600.00
Ways to pay
Note to customer
-RUNNING CONNECTIONS FOR POINT-TO-POINT CONNECTIONS
SYSTEM TO EAST GUARD GATE
View and pay
Total $2,235.00
Page 32 of 194
Credit Policy Disclosure
* In the event of late payment, a 1.5% monthly late fee will be applied to overdue invoices.
Page 1 of 2
Selectric
1211 Boundary St Ste B
Beaufort, SC 29902-4153 US
+18438129215
gaho@selectricllc.com
INVOICE
BILL TO
HH Airport Beaufort County
PO Drawer 1228
Beaufort, SC 29901
INVOICE 37171891
DATE 08/31/2026
TERMS Net 15
DUE DATE 09/15/2026
JOB NAME
HH Airport - Terminal Gates 1+2
ACTIVITY QTY RATE AMOUNT
Commercial:Comm. - Contract
6/29/26 - HH Airport Gates 1+2
- Re-pull existing wiring between airport terminal electrical closet and parking lot
pedestal. Utilize existing wiring and add neutral wire to ensure code-compliance.
- Provide and install 40A outdoor sub-panel in parking lot island to service gates 1
+ 2. Add (2) 20A breakers to connect existing gate wires to.
**If digging is required, Selectric LLC is not responsible for damage to anything
buried underground that is not revealed and marked by SC811 and is not
properly protected by conduit. Selectric LLC is not responsible for the existing
condition of any existing electrical that may be impacted by the scope of work.
Any additions to the scope of work will result in additional costs.
1 4,985.00 4,985.00
Commercial:Comm. - Contract
ADD IF NEEDED:
- If existing wire cannot be re-pulled due to its existing condition: Provide
replacement #6 wire to replace existing wire between terminal electrical closet
and parking lot pedestal
= $3,650
1 3,650.00 3,650.00
Commercial:Comm. - Contract
ADD IF NEEDED:
- If conduit and wire between gate 1 and gate 2 cannot be utilized in its current
condition: Provide and install up to 400ft of conduit and wire to provide 120v to
gate 1 + 2 from new pedestal mounted 40A sub-panel. Make necessary electrical
connections to gates and verify correct voltage. Will require SC811 and a
trencher machine to trench between gates.
= $6,955
1 6,955.00 6,955.00
Our preferred payment methods include credit cards and electronic funds
transfers (ACH). Payments via check are acceptable upon request. Early
payment discounts of up to 1.5% are offered for select services. Contact
our office for discount details.
SUBTOTAL 15,590.00
TAX 0.00
TOTAL 15,590.00
20270044
Line 1
$15,590.00
REC 9/3/26 RB
Page 33 of 194
Credit Policy Disclosure
* In the event of late payment, a 1.5% monthly late fee will be applied to overdue invoices.
Page 2 of 2
Ways to pay
View and pay
BALANCE DUE $15,590.00
tok en=
Page 34 of 194
Credit Policy Disclosure
* In the event of late payment, a 1.5% monthly late fee will be applied to overdue invoices.
Page 1 of 2
Selectric
1211 Boundary St Ste B
Beaufort, SC 29902-4153 US
+18438129215
gaho@selectricllc.com
INVOICE
BILL TO
HH Airport Beaufort County
PO Drawer 1228
Beaufort, SC 29901
INVOICE 37171892
DATE 08/31/2026
TERMS Net 15
DUE DATE 09/15/2026
JOB NAME
HH Airport - Guard + Gate
ACTIVITY QTY RATE AMOUNT
Commercial:Comm. - Contract
6/29/26 - HH Airport Guard Shack + Gate 3
- Install ground box where existing wire between terminal electrical closet and
"guard shack" panel has been cut. Pull up to 100' of wire between terminal
electrical closet panel and ground box. Make connection to existing wiring going
to "guard shack" panel.
**If digging is required, Selectric LLC is not responsible for damage to anything
buried underground that is not revealed and marked by SC811 and is not
properly protected by conduit. Selectric LLC is not responsible for the existing
condition of any existing electrical that may be impacted by the scope of work.
Any additions to the scope of work will result in additional costs.
1 4,895.00 4,895.00
Commercial:Comm. - Contract
ADD IF NEEDED:
- If existing conduit and wire between terminal electrical closet and "guard shack"
cannot be utilized due to its existing condition: Provide replacement #3 wire to
replace the existing. Repair conduit between terminal closet panel and new
ground box as needed.
= $9,400
1 9,400.00 9,400.00
Commercial:Comm. - Contract
ADD IF NEEDED:
- If gate 3 wire and guard shack panel connections have been disconnected:
Make necessary electrical connections to gate 3 and "guard shack" panel.
= $300
1 300.00 300.00
Our preferred payment methods include credit cards and electronic funds
transfers (ACH). Payments via check are acceptable upon request. Early
payment discounts of up to 1.5% are offered for select services. Contact
our office for discount details.
Ways to pay
SUBTOTAL 14,595.00
TAX 0.00
TOTAL 14,595.00
BALANCE DUE $14,595.00
20270044
Line 1
$14,595.00
REC 8/31/26 RB
Page 35 of 194
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
A RESOLUTION TO ACCEPT A SOUTH CAROLINA AERONAUTICS COMMISSION (SCAC) ENTITLEMENT GRANT
FOR THE HILTON HEAD ISLAND AIRPORT (HXD) PEDESTRIAN AND WALKWAY BRIDGE PROJECT — CONTINGENT
UPON FINAL GRANT OFFER.
MEETING NAME AND DATE:
Public Facilities Committee November 16, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval of a resolution to accept a SCAC Entitlement Grant in the amount of $125,000.00
for the HXD Pedestrian and Walkway Bridge Project (Design and Build) — Contingent upon final grant offer.
PRESENTER INFORMATION:
Jon Rembold, A.A.E., Airports Director (3 min.)
ITEM BACKGROUND:
HXD is experiencing increased demand for terminal parking due to growth in passenger traffic, rental car
operations, and airport staffing. To address limited parking capacity, the Airports Department proposes
constructing a pedestrian walkway and bridge connecting recently acquired property designated for
supplemental parking to the commercial terminal parking area. The connection will provide a safe pedestrian
route for airport employees and tenants, preserving existing terminal parking for passengers and rental car
operations while supporting future parking improvements.
FISCAL IMPACT:
The $125,000 grant to offset the project cost will be allocated as follows:
SCAC Entitlement Grant: $125,000
Local match: $0
Funding Source: GL 5402-90-0000-57130
Balance: $6,894,212.83
CONTINGENT UPON FINAL GRANT OFFER
APPROVAL HISTORY:
The Airports Board recommended approval of the Resolution to accept the SCAC grant at the monthly meeting
on November 5, 2026.
Page 36 of 194
RESOLUTION 2026/
A RESOLUTION TO ACCEPT A SOUTH CAROLINA AERONAUTICS
COMMISSION (SCAC) ENTITLEMENT GRANT FOR THE HILTON HEAD
ISLAND AIRPORT (HXD) PEDESTRIAN WALKWAY AND BRIDGE PROJECT
(DESIGN AND BUILD) - CONTINGENT UPON FINAL GRANT OFFER
WHEREAS, HXD is experiencing increased demand for terminal parking due to
continued growth, while the existing terminal parking lot has limited capacity; and
WHEREAS, HXD proposes the construction of a pedestrian walkway and bridge
connecting recently acquired property designated for supplemental parking to the existing
terminal parking area; and
WHEREAS, the proposed pedestrian walkway and bridge will provide a safe,
dedicated pedestrian route for airport employees and terminal tenants to utilize supplemental
parking while preserving existing terminal parking capacity for passengers and rental car
operations; and
WHEREAS, HXD has applied to the SCAC requesting 100% Commercial Service
Airport Entitlement Funds in the amount of $125,000 to offset project costs and supplement
available airport funding; and
NOW, THEREFORE, BE IT RESOLVED that Beaufort County Council, duly
assembled, does hereby authorize the acceptance of a SCAC entitlement grant in the amount of
$125,000 for the HXD Pedestrian Walkway and Bridge Project (Design and build) - contingent
upon SCAC grant offer.
Adopted this ____ day of __________, 2026
COUNTY COUNCIL OF BEAUFORT COUNTY
BY:
Alice Howard, Chairman
ATTEST:
Sarah W. Brock, Clerk to Council
Page 37 of 194
1
PROJECT GRANT APPLICATION
(State Aid for Development of Public Airports)
SCAC Grant No: ____
(Leave blank – For SCAC Use only) Date
PART I - PROJECT INFORMATION
Grant Type being Requested (Check one):
2.5% State match of 95% AIP / AIG Grant
5% State match of 90% AIP
50% Terminal Building Development Grant (NTE $500,000)
60% State – Local Airport Development Grant
75% State – Local Airport Maintenance Grant
85% Non-NPIAS / Un classified, publicly owned, Airport Maintenance or Development
Grant
90% NPIAS Airport Secondary Runway Redevelopment Grant
100% Commercial Service Airport Entitlement Funds
100% Commercial Service Special Allocation
100% Distribution of Earmarked Funds
The (Airport Sponsor) ____________
(herein called the “Sponsor” ) hereby makes appl ication to the South Carolina Aeronautics
Commission (herein designated “SCAC") for a grant of State funds pursuant to applicable statutes,
regulations, and policies, for the purpose of aiding in financing a project (herein called the "Project")
for the development of the (Airport Name) _________ (herein called the
"Airport") located in the County of (County Name) ________ in the State of South
Carolina.
It is proposed that the project consist of the following described airport development (Insert brief
project description / title below):
all as more particularly described in the plans and specifications separately submitted to SCAC on
(Date) , which are made a part hereof by reference.
If applicable, please list numbers of all associated AIP / AIG Grant(s): ________________________
________________________________________________________________________________
(Note: AIP State Match Grants will not be issued in advance of their associated Federal Grant(s).
10/13/2026
Hilton Head Island Airport (HXD)
Hilton Head Island Airport
Beaufort
Construction of a Pedestrian Walkway and Bridge to connect a parking area to the
commercial terminal
None
Page 38 of 194
2
PART II - REPRESENTATIONS
The Sponsor hereby represents and certifies as follows:
1. Legal Authority. The Sponsor has the legal power and authority:
(A) To do all things necessary to undertake and carryout the Project in
conformity with the applicable statues, regulations, and policies;
(B) To accept, receive and disburse grant funds from the State of South Carolina
in aid of the project on the terms and conditions stated in the applicable
statutes, regulations, policies, and proposed grant agreement, and;
2. Funds. The Sponsor now has on deposit $ _______ for
use in defraying the costs of the Project. The present status of these funds is as
follows:
The Sponsor hereby designates (insert name and job title of staff member):
Name: ____
Title: __________________________________________
to receive payments representing SCAC's share of the Project costs.
Printed Name of Sponsoring Agency's Representative
Signature of Sponsoring Agency's Representative
Representative Title
Please list the full name, title, and complete USPS mailing address of the authorized person to
whom the Grant offer and agreement should be mailed:
Name, Title: __________________________________________________
Address: _____________________________________________________
__________________________________________________________
Commercial Entitlement
Brian Cronin
Airport Finance Manager
Stephen J Parry
Deputy Airport Director
26 Hunter Road
Hilton Head Island SC 29926
Jon Rembold, Airport Director
Page 39 of 194
3
ATTACHMENT A
THE FOLLOWING IS A SUMMARY OF THE ACTUAL PROJECT COSTS:
ITEM
TOTAL COST
SPONSOR'S SHARE
OF COST
FEDERAL SHARE
OF COST
STATE SHARE OF
COST
AMOUNT AMOUNT AMOUNT
1. PLANNING COST
2. LAND COST
3. CONSTRUCTION COST
4. ENGINEERING COST
5. ADMINISTRATIVE COST
6. MISCELLANEOUS
7. TOTAL ALL ACTUAL
PROJECT COSTS
Rules for Reimbursing Project Costs Prior to the Grant Execution Date:
Unless specifically recommended by the Executive Director and approved in advance by the Commission, all
project costs must be incurred after the execution date of the Airport Development or Aviation Education
grant. Exceptions to this rule include:
Land or avigation easement acquisitions
Airfield facility emergencies not covered by insurance
Project exceptions identified in the relevant section of the FAA’s AIP Handbook
This policy does not prohibit grant amendments for change orders that arise during construction, provided
they are communicated with SCAC Airport Development staff in advance and approved by Commission.
$95,000
$148,000
$243,000
$125,000
$48,750
$76,250
$71,750
$46,250
$118,000
Page 40 of 194
4
ATTACHMENT B
DOCUMENTATION SUPPORT
1. Is this project a result of facility requirements determined by a Master Plan, Airport Layout Plan (ALP),
the South Carolina Airport System Plan, or a revision to the ALP? ______Yes _______No
If so, indicate FAA or SCAC approval date:
2. Does this project require environmental study / documentation under the National Environmental
Policy Act of 1969 (NEPA)? Yes No
3. If so, please indicate the document type and its status:
Categorical Exclusion (CatEx)
Environmental Assessment (EA) _____________________________________________
Environmental Impact Statement (EIS)
4. Have all previous projects that involved federal and / or state funds been completed?
Yes No (List all Open Federal and State Grants below)
________________________________________________________________________________
_________________________________________________________________________________
5. If the State is unable to participate to the extent requested, what is the Sponsor's ability to fund a
share greater than the State match?
6. Name of Regional Planning Council which airport is located:
7. Has Federal Application Form 424 been submitted to the Inter -agency Council on Public
Transportation (State Clearinghouse) in accordance with Section 57-3-1050?
________Yes No
8. The following action has been taken by the local governing body to provide steps toward protective
zoning of the airspace and land surrounding the airport. Describe actions by the Sponsor and
governing body related to land use planning and zoning ordinances.
9. Anticipated date construction or planning / design project is to commence:
Start Date: Ending Date:
X
NA
X
NA
NA
NA
X
None
Lowcountry Council Of Governments
NA
November 2026
February 2027
See attached open grant spreadsheet
Page 41 of 194
5
ATTACHMENTS
Open Grants and Project information and Justification Statement
Request-for-Aid / Project Sketch
Bid tabulation (Construction projects) or appropriate cost data
Pricing Sheet Professional Services Work Authorization / Task Order
Copy of signed Federal Application Form 424 (if this request is associated with an FAA AIP /
AIG Grant)
Copy of executed Federal AIRPORT INFRASTRUCTURE GRANT AGREEMENT (if this request is
associated with an FAA AIP / AIG Grant)
Earmarked Funds spending plan
Project Environmental Documentation (Categorical Exclusion – CatEx) if required
(Revised: September 6, 2026)
Page 42 of 194
Federal Grant # Description Grant ID Award Amount
64 Acquire Land for Development-28 Hunter Rd-Reimbursement 34500300642026 $ 1,358,322.00
63 Acquire Land for Development-26 Hunter Rd-Reimbursement 34500300632026 1,819,043.00
62 Taxiway F ROFA 34500300622025 306,022.00
61 Air Traffic Control Tower 34500300612025 300,000.00
60 Drainage Construction 34500300602025 1,390,569.00
59 SJBC Relocation EA (FAA AIP) 34500300592024 325,679.00
57 ALP Study (FAA BIL AIG) 34500300572024 825,757.00
56 ATP (BIL) 34500300562024 5,000,000.00
State Grant # Description Grant ID Award Amount
SCAC 23-025 SCAC 23-025-Taxiway F Strengthening SCAC 23-025 $ 378,044.00
SCAC 24-025 Perform Terminal Improvement SCAC 24-025 750,000.00
SCAC 23-029 Terminal Construction Project SCAC 23-029 12,000,000.00
All Grants Summary - Updated 10/13/2026
Page 43 of 194
Hilton Head Island Airport
State Entitlement Funding Request
Project Title: Pedestrian Walkway and Bridge Development
Project Description and Justification
Hilton Head Island Airport (HXD) is experiencing increased demand for terminal parking due to continued growth in passenger
enplanements, rental car operations, and airport staffing. The existing terminal parking lot has limited capacity to
accommodate these competing demands. The airport is currently conducting a parking study to evaluate future parking
expansion, improved accessibility, and long-term parking infrastructure needs.
To address immediate parking constraints, the airport proposes constructing a pedestrian walkway and bridge connecting
recently acquired property designated for supplemental parking to the existing terminal parking area. This connection will
provide a safe, dedicated pedestrian route for airport employees and terminal tenants, allowing them to utilize supplemental
parking while preserving existing terminal parking capacity for passengers and rental car operations.
Upon completion of future parking improvements, the walkway will also accommodate airport customers, providing an
additional pedestrian connection between the supplemental parking area and the terminal.
The project will be delivered utilizing a design-build approach to streamline design and construction, improve project
coordination, and expedite completion. The airport is requesting its allocated SCAC State Entitlement Funds to offset project
costs and supplement available airport funding.
This investment represents a practical infrastructure improvement that addresses current operational needs while supporting
the airport's long-term parking development strategy and continued growth.
Page 44 of 194
Approximate
Stormwater
Location
SECURITY
FENCE
PEDESTRIAN
WALKWAY
AND BRIDGE
TERMINAL MAIN
ENTRANCE
Page 45 of 194
Beaufort County, SC
Airports
Jon Rembold, Director
PO Box 1228, Beaufort, SC 29902
EEVALUATION TABULATION
RFP No. 082526
Pedestrian Walkway and Bridge Project at Hilton Head Island Airport
RESPONSE DEADLINE: August 25, 2026 at 3:00 pm
Report Generated: Wednesday, October 14, 2026
SELECTED VENDOR
VENDOR RECOMMENDED BY THE EVALUATION PROCESS
Vendor Location
NIX CONSTRUCTION Hilton Head Island, SC
VENDOR QUESTIONNAIRE PASS/FAIL
Question Title Astra Group, LLC D Anderson Construction
Company, Inc.
Esposito Commercial
Construction, LLC
NIX CONSTRUCTION Reeves Young, LLC
Proposer confirms the
proposal is firm for a
period of at least 90 days
from the closing date for
submission of proposal.
Pass Pass Pass Pass Pass
Please Provide Licenses
and Certificate of
Insurance.
Pass Pass Pass Pass Pass
Certification regarding
Debarment, Suspension,
Ineligibility, and
Voluntary exclusion
Pass Pass Pass Pass Pass
Page 46 of 194
EVALUATION TABULATION
RFP No. 082526
Pedestrian Walkway and Bridge Project at Hilton Head Island Airport
EVALUATION TABULATION
Request For Proposal - Pedestrian Walkway and Bridge Project at Hilton Head Island Airport
Page 2
QQuestion Title AAstra Group, LLC DD Anderson Construction
CCompany, Inc.
EEsposito Commercial
CConstruction, LLC
NNIX CONSTRUCTION RReeves Young, LLC
State whether your
company has been
involved in any litigation
within the past five (5)
years, arising out of your
performance.
Pass Pass Pass Pass Pass
Explain fully any litigation
involving performance.
Pass No Response No Response No Response No Response
Non-Segregated Facilities Pass Pass Pass Pass Pass
Please upload any
relevant certifications
and/or licenses
Pass No Response No Response Pass Pass
Proposal Pass Pass Pass Pass Pass
PPHASE 1
EVALUATORS
Name Title Agreement Accepted On
Marlene Myers Airports Business Manager Aug 26, 2026 8:20 AM
Charles Neeson Airport Operations Chief Aug 31, 2026 2:43 PM
Stephen Parry Deputy Airports Director Aug 26, 2026 2:49 PM
EVALUATION CRITERIA
Criteria Scoring Method Weight (Points)
Qualifications & Relevant Experience Points Based 35 (35% of Total)
Page 47 of 194
EVALUATION TABULATION
RFP No. 082526
Pedestrian Walkway and Bridge Project at Hilton Head Island Airport
EVALUATION TABULATION
Request For Proposal - Pedestrian Walkway and Bridge Project at Hilton Head Island Airport
Page 3
Description:
Evaluation of the proposer's experience designing and constructing pedestrian bridges, walkways, or similar infrastructure projects. Consideration will be given to
the firm's qualifications, experience on comparable projects, references, and demonstrated ability to successfully complete projects of similar scope and
complexity.
CCriteria SScoring Method WWeight (Points)
Project Approach & Technical Proposal Points Based 30 (30% of Total)
Description:
Evaluation of the proposer's understanding of the project, proposed design approach, construction methodology, permitting strategy, project schedule, and
ability to deliver a durable, safe, ADA-compliant, and low-maintenance pedestrian bridge and walkway.
CCriteria SScoring Method WWeight (Points)
Project Schedule Points Based 30 (30% of Total)
Description:
Evaluation of the proposed timeline for design, permitting, construction, and project completion, including the proposer's abil ity to complete the work efficiently
while minimizing disruption to airport operations.
CCriteria SScoring Method WWeight (Points)
Value to the Airport Points Based 5 (5% of Total)
Description:
The airport seeks a solution that provides the overall best value to the airport.
Value includes overall durability, warranty, aesthetics, low-maintenance materials, etc.
Page 48 of 194
EVALUATION TABULATION
RFP No. 082526
Pedestrian Walkway and Bridge Project at Hilton Head Island Airport
EVALUATION TABULATION
Request For Proposal - Pedestrian Walkway and Bridge Project at Hilton Head Island Airport
Page 4
AAGGREGATE SCORES SUMMARY
Vendor Marlene Myers Charles Neeson Stephen Parry Total Score
(Max Score 100)
NIX CONSTRUCTION 97 89 95 93.67
Reeves Young, LLC 96 86 92 91.33
D Anderson Construction
Company, Inc.
84 88 89 87
Astra Group, LLC 93 67 88 82.67
Esposito Commercial
Construction, LLC
85 79 81 81.67
VENDOR SCORES BY EVALUATION CRITERIA
Vendor Qualifications & Relevant
Experience
Points Based
35 Points (35%)
Project Approach &
Technical Proposal
Points Based
30 Points (30%)
Project Schedule
Points Based
30 Points (30%)
Value to the Airport
Points Based
5 Points (5%)
Total Score
(Max Score 100)
NIX CONSTRUCTION 33.7 28 27 5 93.67
Reeves Young, LLC 32.3 26.7 28 4.3 91.33
D Anderson Construction
Company, Inc.
29 27 27 4 87
Astra Group, LLC 32.7 23.7 22.7 3.7 82.67
Esposito Commercial
Construction, LLC
29 26.3 22.3 4 81.67
Page 49 of 194
Nix Construction Company, Inc.
2 Corpus Christi, Suite 203
Hilton Head Island, SC 29928
(843) 341-2330
www.NixConstruction.com
Gillian Murray September 25, 2026
Beaufort County Procurement
102 Industrial Village Rd #2
Beaufort, SC
Re: HH Airport Pedestrian Bridge – Pricing & Scheduling Options
Dear Gillian,
Below are the formal pricing and schedule options for our Hilton Head Airport Pedestrian
Bridge design-build proposal submitted last week.
Pricing
Option Phase 1 –
Design
Phase 2 –
Construction Total
Option 1 – Prefabricated Cascade truss
bridge, composite deck and top-chord
cladding, stainless cable rail
$95,000 $218,000 $313,000
Option 2 – Nix site-built timber bridge,
stainless cable rail $95,000 $148,000 $243,000
Phase 1 includes: Civil Engineering (Ward Edwards), Structural Engineering (29e6),
Wetlands/endangered Species Assessments (Newkirk), Geotechnical (Whitaker), Corridor Survey
(Atlas), and Nix Preconstruction Services.
Phase 2 includes: Concrete Abutments, Grading And Asphalt Paving, Erosion Control, Electrical
(Subcontractor And Fixtures), And General Conditions.
Schedule
We recognize the need for this project to complete before the Heritage Golf Tournament begins
in April 2027, however, we are unable to confirm the permitting portion of the schedule until we
are allowed to open clear communication with SC DES for Land Disturbance and Town of
Hilton Head Island for Building Permit requirements. Upon approval, we will immediately seek
direction from both jurisdictions to determine the fastest and most efficient way through this
process.
Scheduling Scenarios (From Notice to Proceed) Phase 1 – Design &
Bldg Permit
Phase 2 –
Construction Total
‘Excluding’ SC DES land-disturbance 14 weeks 5 weeks 19 weeks
‘Including’ SC DES land-disturbance 25 weeks 7 weeks 32 weeks
Page 50 of 194
Nix Construction Company, Inc.
2 Corpus Christi, Suite 203
Hilton Head Island, SC 29928
(843) 341-2330
www.NixConstruction.com
Thank you for allowing us the opportunity to provide this proposal and we look forward to
hearing from you soon.
Sincerely,
Eric Hoover, PE | President
Eric@NixConstruction.com | Cell: 843-505-2455
Page 51 of 194
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
AN ORDINANCE AUTHORIZING THE ACCEPTANCE OF ROBIN WAY INTO COUNTY ROAD INVENTORY
MEETING NAME AND DATE:
Public Facilities Committee November 16, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
The following approaches may be considered regarding the future maintenance of Robin Way and the Robin
Wood Special Purpose Tax District:
• Acceptance of Robin Way into the County Road Inventory: Accept Robin Way into the County road
inventory, with the County assuming responsibility for future roadway maintenance.
• Appointment of Members to the Robin Wood Board of Commissioners: Appoint members to the
board of commissioners to provide oversight and administration of the Robin Wood Special Purpose
Tax District.
PRESENTER INFORMATION:
Bryan Bauer, Director of Engineering
Kelsie Floyd, Right of Way Manager (10 min)
ITEM BACKGROUND:
The Robin Wood Special Purpose Tax District (SPTD) was established in 1992 through Ordinance 92/12 for the
purpose of maintaining the roadway to include drainage and other public works incidents to road
maintenance. The SPTD serves twenty-five lots within the Robin Wood Subdivision on Lady’s Island. Although
assessments were historically levied and collected to support these maintenance activities, Beaufort County
ceased collecting SPTD assessments around 2015. Despite the cessation of collections the district remains
codified in Division 8 of the Beaufort County Code.
A review of County records determined that Robin Way, the sole roadway providing access to all properties
within the subdivision, is privately owned by the original subdivision developers. Beaufort County also owns
the grassed detention area/open space depicted on Exhibit A of the proposed ordinance. The remaining two
out of four recognized owners of the roadway have submitted a petition requesting that Robin Way and the
associated drainage be accepted into the County road inventory for perpetual care. Additionally, of the
twenty-five abutting property owners within the Robin Wood Subdivision, nineteen have signed a petition
supporting Beaufort County’s acceptance of Robin Way into the County road maintenance system.
The County’s 2025 Annual Comprehensive Financial Report identifies an unexpended balance of $22,002
attributable to the SPTD. To address the request from the roadway owners and signed petitions of support
from residents of Robin Way, staff has prepared an ordinance for acceptance of Robin Way into Beaufort
County’s road inventory.
Page 52 of 194
FISCAL IMPACT:
Future impacts could cost below:
• Estimated potential cost for 20-year life cycle for resurfacing/maintenance ≈ $1.7 million (C-Funds account
# 2343-30-0000-54500)
APPROVAL HISTORY:
Page 53 of 194
ORDINANCE NO. 2026/
AN ORDINANCE AUTHORIZING THE ACCEPTANCE OF
ROBIN WAY INTO THE COUNTY ROAD INVENTORY
WHEREAS, Beaufort County Council established the Robin Wood Special
Purpose Tax District ("SPTD") in 1992 pursuant to Ordinance No. 92/12 for the
purpose of maintaining the roadway within the Robin Wood Subdivision, including
drainage and other public works incidental to road maintenance; and
WHEREAS, the Robin Wood SPTD encompasses twenty-five (25) lots
located within the Robin Wood Subdivision on Lady's Island in Beaufort County,
as more particularly depicted on Exhibit "A" attached hereto and incorporated
herein by reference; and
WHEREAS, assessments were historically levied and collected for the
Robin Wood SPTD to support roadway, drainage, and related maintenance
activities, although Beaufort County ceased collecting assessments for the SPTD
in or about 2015; and
WHEREAS, notwithstanding the cessation of assessment collections, the
SPTD was not formally repealed or dissolved by County Council and remains
established pursuant to Section 66-476 of the Beaufort County Code; and
WHEREAS, the Beaufort County 2025 Annual Comprehensive Financial
Report identifies a balance of Twenty -Two Thousand Two Dollars ($22,002)
attributable to the Robin Wood Special Purpose Tax District; and
W
HEREAS, through a review of Beaufort County records concerning
the Robin Wood Subdivision, it was determined that Robin Way, the sole
roadway within the Robin Wood Subdivision, is privately owned by the
developers of the subdivision; and
W
HEREAS, as the owners of Robin Way, the developers have submitted
a petition requesting that Robin Way be accepted into the County’s road
inventory; and
W
HEREAS, two developers have executed the petition, one original
developer is deceased, and another developer entity associated with the
subdivision has been dissolved according to records of the South Carolina
Secretary of State; and
W
HEREAS, the petition executed by the two developers is attached
hereto as Exhibit “B” and incorporated herein by reference; and
Page 54 of 194
WHEREAS, acceptance of Robin Way and the associated drainage
system into the County's maintenance system will provide for the orderly
transition of roadway and drainage maintenance responsibilities to Beaufort
County and provide for the perpetual care and maintenance of the roadway; and
WHEREAS, the County Council intends that the acceptance of Robin
Way and the associated drainage system authorized by this Ordinance be
considered separately from any future action concerning the dissolution of the
Robin Wood Special Purpose Tax District.
WHEREAS, County Council finds it appropriate to authorize the
County Administrator to execute any necessary conveyance or related documents
should the roads be determined to meet applicable County standards and
acceptance criteria; and
NOW, THEREFORE, BE IT ORDAINED that Beaufort County Council
authorize the County Administrator to execute any and all documents associated with
conveyance of Robin Way into the County Road Inventory, identified in attached Exhibit “A”.
ADOPTED this _____ day of _______, 2026.
COUNTY COUNCIL OF BEAUFORT COUNTY
By: ______________________________________
Alice Howard, Chair
ATTEST:
___________________________
Sarah W. Brock, Clerk to Council
Third and Final Reading:
Public Hearing:
Second Reading:
First Reading:
Page 55 of 194
Exhibit "A"
Page 56 of 194
Exhibit "B"
Page 57 of 194
Page 58 of 194
Street Name: Robin Way Year 1
Linear Feet: 1110 Mobilization 150,000.00$
Width (Ft.): 24 Bonds & Insurance 27,500.00$
Square Feet: 26,640 Traffic Control 150,000.00$
Liquid Asphalt 15,954.40$
4" Patching 14,800.00$
Surface D
Surface C 16,280.00$
2" Milling 29,600.00$
Rejuvenator
Year 1 Total: 404,134.00$
Year 10
Mobilization 195,715.98$
Bonds & Insurance 35,881.26$
Traffic Control 195,715.98$
Liquid Asphalt 10,408.44$
4" Patching 19,310.64$
Surface D 21,241.71$
Surface C
2" Milling
Rejuvenator
Year 10 Total: 478,274.00$
Year 20
Mobilization 263,025.91$
Bonds & Insurance 48,221.42$
Traffic Control 263,025.91$
Liquid Asphalt 13,988.07$
4" Patching 25,951.89$
Surface D
Surface C 85,641.24$
2" Milling 51,903.78$
Rejuvenator
Year 20 Total: 751,758.21$
Rejuvinator Cost (20 Year Life Cycle)
$70,979.21
20 Year Life Cycle Estimated Costs
TOTAL COST:
$1,705,145.82
Engineering Cost Estimate
Page 59 of 194
DIVISION 8. - ROBIN WOOD SPECIAL PURPOSE TAX DISTRICT
Sec. 66-476. - Creation; boundaries.
There is created a special purpose tax district to be known as the Robin Wood Special Purpose Tax
District which shall include those 25 lots located at Robin Wood Subdivision, on Lady's Island in the
county, in Robin Wood Subdivision shown on the plats in the office of the register of deeds.
(Code 1982, § 7-101)
Sec. 66-477. - Board of commissioners created, composition, terms of office.
(a) There is established the Robin Wood Board of Commissioners, composed of five members or fewer
to be appointed by the majority vote of the county council. Once 50 percent of the lots in the Robin
Wood Subdivision are sold, each member of the board must be a record owner, either in whole or
part, of a lot of land in Robin Wood Subdivision.
(b) The term of office shall be for a period of four years and shall continue until successors are
appointed and qualified. The board of commissioners shall follow t he guidelines as established in the
county's template ordinance.
(Code 1982, § 7-102)
Sec. 66-478. - Compensation, officers and reports of board of commissioners.
(a) The members of the board of commissioners of the Robin Wood Special Purpose Tax Distr ict shall
serve without pay and shall annually file a report with the county council, not later than November 1
of each year, showing all activities and disbursements during the fiscal year.
(b) The board shall select from among themselves a chairman, vi ce-chairman and secretary/treasurer
who shall each serve for two years from the date of their respective appointments. All official
documents shall be signed by the chairman and attested by the secretary, except that all
disbursements shall be by the treasurer.
(Code 1982, § 7-103)
Sec. 66-479. - Powers and duties of board of commissioners.
The board of commissioners of the Robin Wood Special Purpose Tax District shall have the following
powers and duties:
(1) Adopt an annual budget for the operation of the district and approve the expenditure of all
funds;
(2) May increase the assessment by majority vote of the board or by authority of this division
should inflation exceed the passbook rate thereby requi ring additional funds to meet budgeted
expenditures; or, if consolidation of lots occurs, the board shall ensure proper assessment on
an original plat basis. If the board fails to provide for an assessment in any year, the county
auditor and treasurer are directed to continue assessment as was established for the previous
year;
(3) Borrow money or accept donations under such terms and conditions as it may deem beneficial
for the district, and use or expend the money or donations for the purposes of maintaining roads
and improving drainage and other public works incident to road maintenance. The full faith and
Page 60 of 194
taxing power of the tax district is irrevocably pledged for the payment of the indebtedness of the
tax district;
(4) Levy and assess each lot within the district on an equal, per -lot basis, through the county
auditor and treasurer. The initial assessment shall be $27.50 per lot per year. Upon collection of
the assessments, the board shall, after deducting its costs therefrom, disburse the money to
any lender or other source of funding as may be necessary to pay any indebtedness by or on
behalf of the district. Remaining funds shall be placed in an escrow account bearing the highest
percentage rate available and under the protection of FDIC or FSLIC as a safeguard against
inflation;
(5) Enter into contracts for road resurfacing and/or maintenance and other public works incident to
road resurfacing and/or maintenance;
(6) Resurface and maintain roads, to include drainage and other public works incident to road
resurfacing and maintenance in the tax district; and
(7) Maintain roads and drainage easements in the tax district.
(Code 1982, § 7-104)
Sec. 66-480. - Duties of county auditor, treasurer and council.
The county auditor and treasurer and county council are directed to levy and assess each lot within
the Robin Wood Special Purpose Tax District and collect a tax therefrom, for such amounts as directed by
the board of commissioners, with the first assessment being $27.50 per year per lot for the Robin Wood
Special Purpose Tax District. (The formula for assessment shall be computed as follows: total linear
footage of roadways times $0.70 per foot divided by the number of lots. The equation is based upon
$34,000.00 per mile for a ten- year period.) All sums collected shall be credited to the district and
delivered to such persons or entities as may be directed by the board. The board is responsible for
notifying the county auditor of the assessment by March 15 of each calendar year.
(Code 1982, § 7-105)
Sec. 66-481. - Termination of district.
The board of commissioners of the Robin Wood Special Purpose Tax District shall be allowed to
petition the county to be dissolved upon presentation of sufficient documentation that the roads and
drainage which have been maintained by the special purpose tax district have been accepted for
perpetual care and maintenance by a governmental agency or duly incorporated homeowners'
association. The county council may, by majority vote, determine whether to dissolve the tax district or
continue its existence. Upon the tax district being dissolved, any funds belonging to the tax district shall
be paid to the Robin Wood Homeowners' Association if formed; if not, excess shall escheat to the general
fund of the county council.
(Code 1982, § 7-106)
Sec. 66-482. - Penalty for delinquency.
When the fees and assessments or any portion of the fees and ass essments charged against any
property or person in the Robin Wood Special Purpose Tax District for the current fiscal year are not paid
for by January 16 or 30 days after the mailing of the fee and assessment notice, whichever occurs later,
the county auditor shall add a penalty of three percent on the total amount of the fee assessment due,
and the county treasurer shall collect the penalty. If the fees and/or assessments and penalty are not paid
before the next February 2, an additional penalty of seven percent must be added by the county auditor
Page 61 of 194
and collected by the county treasurer. If the fees, assessments, and penalty are not paid before the next
March 17, an additional penalty of five percent must be added and collected by the county treasurer. If
the fees, assessments, and penalties are not paid before or by March 17, the county treasurer shall issue
his execution to the officer authorized and directed to collect delinquent taxes, assessments, and
penalties, and costs for their collection as provided in this division and by the Code of Laws for South
Carolina, 1976, as amended, for the collection of delinquent taxes. If the penalty dates required by this
section fall on a Saturday, Sunday or legal holiday, the dates are extended to the end of the second
business day immediately following which is not a Saturday, Sunday or legal holiday.
(Code 1982, § 7-107)
Secs. 66-483—66-510. - Reserved.
Page 62 of 194
Page 63 of 194
Page 64 of 194
Page 65 of 194
Page 66 of 194
Page 67 of 194
Page 68 of 194
Page 69 of 194
Page 70 of 194
Page 71 of 194
Page 72 of 194
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE NECESSARY DOCUMENTS AND
PROVIDE FUNDING FOR THE PURCHASE OF THE 302 PARKER DRIVE FOR PUBLIC WORKS AND OTHER COUNTY
OPERATIONS
MEETING NAME AND DATE:
Public Facilities Committee November 16, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Recommend that County Council approve the ordinance authorizing acquisition of 302 Parker Drive for use as
a Public Works facility
PRESENTER INFORMATION:
Jared Fralix, Assistant County Administrator, 10 minutes
ITEM BACKGROUND:
Beaufort County is working to improve its Public Works facilities to support more efficient operations and
consolidate functions within a coordinated campus. The Public Works facility was identified as a top priority in
the 2021 Facilities Master Plan. Initial studies and design have already been initiated for a new facility at the
Shanklin Road campus, and bond funding was secured in 2025 to fully fund the project.
During design, the GlassWRX facility, located at 302 Parker Drive, became available on the market and was
introduced as a purchase-and-renovate alternative to new construction. Based on investigation and due
diligence completed to date, County staff and the design team have determined that this alternative is feasible
and can meet the County’s needs while providing additional space, at an equivalent or lower overall project
cost, and within a shorter delivery timeframe than the new-build option.
The ordinance advances the Public Works improvement and consolidation effort by authorizing the County
Administrator to execute the purchase agreement and closing documents within the Council-approved price
and available appropriations, subject to satisfactory remaining due diligence and County Attorney approval as
to legal form.
FISCAL IMPACT:
The purchase price is $X,XXX,XXX, in addition to closing costs. The funding source is the 2025 GO Bonds Fund
(Fund 4013), specifically for Renovations to Buildings - 4013-80-1301-54420, which has an account balance of
$25,000,000.
APPROVAL HISTORY:
Page 73 of 194
ORDINANCE 2027/_____
AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE
THE NECESSARY DOCUMENTS AND PROVIDE FUNDING FOR THE PURCHASE
OF REAL PROPERTY AT 302 PARKER DRIVE FOR PUBLIC WORKS AND OTHER
COUNTY OPERATIONS
WHEREAS, Beaufort County (“County”) is a body politic and political subdivision of the
State of South Carolina; and
WHEREAS, under S.C. Code Ann. Sections 4-9-25 and 4-9-30, the County is empowered
to act in matters involving the health, safety, and welfare of its citizens, and may acquire real
property; and
WHEREAS, the County desires to purchase the real property commonly known as the
Glass WRX facility, owned by Glass WRX SC LLC, located at 302 Parker Drive, Beaufort County,
South Carolina, identified with TMS No R120 025 000 0170 000, together with the building and
improvements thereon, hereinafter referred to as the “Property”; and
WHEREAS, the County has identified the Property as a potential facility for consolidation
of Public Works and other County departments, including offices, operational support, equipment
storage, warehousing, and related County functions; and
WHEREAS, the County is conducting due diligence to evaluate the condition and
suitability of the Property, including roof replacement, structural improvements associated with
the proposed use, environmental conditions, title, and the cost of adapting the facility for County
operations; and
WHEREAS, the County agrees to purchase, and the Seller agrees to sell the Property for a purchase
price of XXXX Dollars ($XXX.00) plus closing costs as provided in the purchase agreement; and
WHEREAS, the funding for the purchase of the Property will be from the 2025 GO Bonds Fund
(Fund 4013) – Renovations to Buildings, line item 4013-80-1301-54420; and
WHEREAS, Beaufort County Council finds that acquisition of the Property, subject to the
conditions stated herein, is in the best interest of the citizens and residents of Beaufort County.
NOW, THEREFORE, BE IT ORDAINED by Beaufort County Council, duly assembled,
authorizes the County Administrator to execute the necessary documents to purchase and to fund the
purchase of the real property located at 302 Parker Drive as described above.
DONE this ____ day of ___________ 2027.
COUNTY COUNCIL OF BEAUFORT COUNTY
BY:
Alice Howard, Chairwoman
ATTEST:
Page 74 of 194
Sarah W. Brock, Clerk to Council
Page 75 of 194
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
A RESOLUTION ADOPTING BEAUFORT COUNTY ROAD CONSTRUCTION STANDARDS AND SPECIFICATIONS
MEETING NAME AND DATE:
Public Facilities Committee November 16, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval and referral to County Council for approval.
PRESENTER INFORMATION:
Bryan Bauer, PE, Director (5 minutes)
ITEM BACKGROUND:
Beaufort County has not had in-house road construction standards and specifications but has relied on the
South Carolina Department of Transportation Construction Standards and Specifications for guidance in
building roads and related structures. These standards and specifications are specific to Beaufort County and
reflect the needs and circumstances encountered in the Lowcountry and that are specific to Beaufort County.
FISCAL IMPACT:
There is no fiscal impact to the County at this time.
APPROVAL HISTORY:
Page 76 of 194
BEAUFORT COUNTY
STANDARDS & SPECIFICATIONS
February 2025
Prepared by:
Page 77 of 194
Beaufort County Standards &
Specifications
Page 2
Contents
Acronym/Abbreviations .............................................................................................................................................................................................4
CHAPTER 1. INTRODUCTION ...................................................................................................................................................................................5
CHAPTER 2. ENCROACHMENT PERMITS ............................................................................................................................................................6
2.1 Encroachments and Work within Rights-of-Way and Drainage Easements ......................................................................6
CHAPTER 3. CONTRACTS ........................................................................................................................................................................................10
3.1 OPEN SECTION ...............................................................................................................................................................................................10
CHAPTER 4. DRIVEWAYS, SCHOOL ACCESS DESIGN, STREET INTERSECTIONS, AND SIGHT DISTANCE ...........................10
4.1 General Information .....................................................................................................................................................................................10
CHAPTER 5. SIDEWALKS, TRAILS, AND CURB & GUTTER ........................................................................................................................11
5.1 General Information .....................................................................................................................................................................................11
CHAPTER 6. TRAFFIC CONTROL DEVICES .......................................................................................................................................................12
6.1 Work Zone Traffic Control .........................................................................................................................................................................12
Refer to the SCDOT Standard Drawings 600 Specification and MUTCD for information. ......................................................12
a) Lane restrictions on Bluffton and Buckwalter Parkway from 9PM to 6AM. ...................................................................12
b) Follow all other lane restrictions per the SCDOT .......................................................................................................................12
6.2 Traffic Control Signage ................................................................................................................................................................................12
Refer to the SCDOT Standard Drawings 600 Specification and MUTCD for information. ......................................................12
6.3 Signals .................................................................................................................................................................................................................12
6.4 Pavement Markings ......................................................................................................................................................................................12
6.5 Traffic Calming ................................................................................................................................................................................................14
CHAPTER 7. TRAFFIC IMPACT ANALYSIS (TIA) ............................................................................................................................................14
CHAPTER 8. ROADSIDE ENCROACHMENTS ....................................................................................................................................................18
8.1 Refer to Chapter 9 of the ARMS Manual, latest edition and the following .............................................................................18
CHAPTER 9. DRAINAGE, ENVIRONMENTAL, AND EROSION CONTROL .............................................................................................19
9.1 Refer to the SOLOCO Manual for information. ...................................................................................................................................19
CHAPTER 10. BRIDGES, CULVERTS AND RETAINING WALLS ................................................................................................................19
10.1 Refer to the SCDOT Bridge Manual (latest edition) for information. ....................................................................................19
CHAPTER 11. CONSTRUCTION ..............................................................................................................................................................................19
11.1 General Information ...................................................................................................................................................................................19
11.2 Minor Rural Road Standards ..................................................................................................................................................................23
11.3 Secondary Rural Road Standards .........................................................................................................................................................23
11.4 Local Road Standards ................................................................................................................................................................................24
11.5 Collector Road Standards .........................................................................................................................................................................25
Page 78 of 194
Beaufort County Standards &
Specifications
Page 3
11.6 Arterial/Industrial Road Standards .....................................................................................................................................................27
11.7 Road Design ...................................................................................................................................................................................................29
11.8 Construction ..................................................................................................................................................................................................30
CHAPTER 12. LANDSCAPING GUIDELINES ......................................................................................................................................................34
12.1 Refer to the County Development Code for information. .......................................................................................................34
CHAPTER 13. DIRT ROADS ...............................................................................................................................................................................34
13.1 Refer to the County Dirt Road Standards for information. ........................................................................................................34
CHAPTER 14. RIGHTS OF WAY ........................................................................................................................................................................34
14.1 OPEN SECTION .............................................................................................................................................................................................34
Definitions ......................................................................................................................................................................................................................34
References ......................................................................................................................................................................................................................42
Page 79 of 194
Beaufort County Standards &
Specifications
Page 4
Acronym/Abbreviations
Acronym/Abbreviation Definition
AASHTO American Association of State Highway and Transportation Officials
ADA Americans with Disabilities Act
ADAAG Americans with Disabilities Act Accessibility Guidelines
ARMS Access and Roadside Management Standards
ASTM American Society for Testing Materials
CDC County Development Code
COUNTY Beaufort County Engineering Department
HOA/POA Homeowners’ Association/Property Owners’ Association
MLW Mean Low Water
MUTCD Manual on Uniform Traffic Control Devices
NAVD 88 North American Vertical Datum of 1988
OCRM Office of Ocean and Coastal Resource Management
SCDES South Carolina Department of Environmental Services
SCDOT South Carolina Department of Transportation
SCDOT (SS) South Carolina Department of Transportation Standard Specifications for Highway Construction,
latest edition
SCDOT (SD) South Carolina Department of Transportation Standard Drawings, latest edition
SOLOCO Southern Lowcountry Stormwater Design Manual
TIA Traffic Impact Analysis
USACE United States Army Corps of Engineers
Page 80 of 194
Beaufort County Standards &
Specifications
Page 5
CHAPTER 1. INTRODUCTION
1.1 General Information
This Road Construction Manual is intended to provide the minimum requirements for improvements or construction
activities within the Beaufort County road system. Roads and associated systems must be designed and constructed in
accordance with these standards and approved by the COUNTY in order for the County to accept into the County Road
System and work in the County ROW, including:
A. New construction
B. Staged development of roadways
C. Widenings
D. Improvements to roadway appurtenances such as storm drainage systems
E. Encroachments
The Public Works Department/Engineering will approve all plans for the construction, upgrading, or encroachments into
County right-of-way. The Contractor/Developer will be responsible for providing quality control testing to Beaufort
County/Engineering departments. Construction of county roads and appurtenances will be subject to quality assurance
inspections and acceptance by Beaufort County Public Works, Engineering, or their designee.
1.2 Hierarchy of Standards
The Beaufort County Road Construction Manual is the principal document for county design and construction standards.
This document also references several other manuals for further information. Requirements not explicitly provided
herein shall fall back to the reference documents provided. All references to SCDOT specifications shall be the latest
version available at the time of bid.
Hierarchy of road standards:
A. Contract Documents
B. Beaufort County Road Construction Manual
C. Most recent SCDOT standards, specifications, instructional bulletins, and memos including:
i. Special Provisions
ii. Plans
iii. SCDOT Standard Drawings
iv. Supplemental Technical Specifications
v. Supplemental Specifications
vi. Standard Specifications
D. AASHTO and/or other applicable national highway standards
1.3 Design Year Requirements
In general, roadways should be designed for the anticipated traffic density 20 years from the proposed date of
construction. Current and future traffic data may be required to demonstrate the design capacity need. Long-range
planning studies, future development, and zoning regulations should be considered in the design. Traffic impact analysis
(TIA) may be required for the design.
Page 81 of 194
Beaufort County Standards &
Specifications
Page 6
CHAPTER 2. ENCROACHMENT PERMITS
2.1 Encroachments and Work within Rights-of-Way and Drainage Easements
A. Introduction. This section is intended to provide a general guideline for the design and construction of
structures that may be located within right-of-way or drainage easements that have been, or will be,
accepted into the Beaufort County maintenance system. No work shall be commenced until an
encroachment permit for such work has been obtained from the COUNTY. No roadways will be taken into
the County system unless approved by the County Council.
B. Encroachment Permits - General. Any permanent or temporary construction or placement of any structure
or object (driveway, sign, fence, utility, etc.) within a Beaufort County drainage easement or road right-of-way
must receive an encroachment permit from the Engineering Department prior to the beginning of work or
emplacement of structure or object. All work within publicly owned or maintained right-of-way and/or
easements must comply with the requirements provided in this chapter, the encroachment permit
application package, the SCDOT ARMS manual, and/or SCDOT’s Policy for Accommodating Utilities on
Highway Rights-of-Way. Any encroachment shall not impede sight distance of the traveling public.
1. The encroaching entity will submit all permit requests on the Beaufort County APPLICATION FOR
ENCROACHMENT PERMIT FORM for review. Permit applications will be reviewed and issued with
comments, approved, or denied by the COUNTY within 30 days of receipt. Applications are not
automatically approved after 30 days if no comments are received.
2. If it is the opinion of Beaufort County, SCDOT , or any other public agency, that it is necessary to relocate
or remove the encroachment, or any part thereof, due to the improvement, relocation, or widening of
the road, street, or drainage system, or for any other reason, such moving or removing will be done only
at the request of the COUNTY at the expense of the permittee.
3. The COUNTY may require the removal of unpermitted encroachments (driveways, piping of any kind,
physical structures, etc.). The County may remove the object, at the property owner’s expense, sooner
if the object is deemed hazardous to the public and causes unsafe conditions. The
Landowner/Developer will be notified of the illegal encroachment by letter and will be given 30 days to
remove the unpermitted encroachment or to obtain a permit. Should the encroachment not be removed
or permitted within this timeframe, Beaufort County, or an agent of the County, will remove the
encroachment at the expense of the Landowner/Developer.
4. The Beaufort County Engineering office shall be notified no later than 24 hours prior to the
commencement of work. Failure to do so shall be considered sufficient grounds to revoke the permit.
Work undertaken without a valid permit may be subject to legal action by the county attorney under the
applicable statutes of the County.
5. Adequate provisions shall be made for the protection of the traveling public at all times when
performing work under an encroachment permit. During the progress of the work, all necessary detours,
barricades, warning signs, and flagmen will be provided by, and at the expense of, the permittee to ensure
safety. Submit a Traffic Control Plan as described in the SCDOT (SS) Section 601.1.2 to be approved by
the COUNTY. Traffic control operations shall be supervised by a competent person.
6. Restoration work shall be immediately accomplished to return the road and/or drainage system to prior
Page 82 of 194
Beaufort County Standards &
Specifications
Page 7
condition or better. The liability of the permittee will not be released until all work is inspected and
approved by the COUNTY.
7. Any proposed infrastructure encroachment into a public easement which crosses a parcel boundary
shall be accompanied with written permission from affected landowner(s).
8. During construction, and prior to County acceptance, the applicant shall be responsible for the
maintenance of the road and all associated drainage for a one (1) year warranty period.
9. The permittee will be responsible for the maintenance associated with the permitted facility in
perpetuity. The permittee shall follow all necessary procedures to protect Beaufort County facilities
and the traveling public. Failure to do so may result in permit revocation.
10. The permittee will be responsible for coordinating work schedules, traffic impacts, and property access
changes with the businesses and/or homeowners impacted by the work.
C. Types of Encroachments within Public Rights-of-Way and Easements.
1. Driveway encroachment permit applications shall be designed in accordance with the SCDOT ARMS
Manual unless otherwise approved. Residential driveway widths shall be limited to a minimum 12 feet
and maximum 20 feet. Refer to the encroachment permit for driveway widths. Minimum driveway radii
shall be 5 feet. Shared driveways are allowed for commercial and residential use. Widths, radii, or curb
cut dimensions for shared driveways will be reviewed and approved on a site-specific basis. Driveway
culverts shall be a minimum diameter of 15 inches and a minimum of 20 feet in length, or additional
length necessary to maintain a 2:1 fill slope over the pipe. The permittee will be required to verify the
culvert is designed sufficient to not negatively impact the flow channel 300 feet upstream and
downstream of the encroachment or to the nearest culverts in each direction. Driveway aprons shall be
at least equal to the type of surface with which it is being connected (Pavement, rock, or earth). The
permittee may be required to provide as-built information for the driveway. Commercial driveways shall
be designed sufficient for the largest class vehicle use and will be reviewed on a site-specific basis.
2. The piping of open conveyances shall be sized appropriately to accommodate the drainage of upstream
and downstream flow. A minimum of one 4-foot by 4-foot junction box or inlet shall be required to
accept Roadway sheet flow, though more may be required at the discretion of the COUNTY
STORMWATER DEPARTMENT. Request for piping of roadside ditches may be rejected, at the discretion
of the COUNTY STORMWATER DEPARTMENT or removal of sprinklers will be at the cost of the property
owner.
3. The installation of physical structures (including, but not limited to, fences, trees, bridges, piping,
landscaping beds, roads, and driveways) shall require encroachment permits. Beaufort County
Engineering Department reserves the right to deny encroachment permit applications.
4. Landscaping and Planting. Installation of landscaping and planting shall require encroachment permits.
Each application will be reviewed for adequate site triangles, line-of-sight, etc. on a site-specific basis
by the COUNTY.
5. Subdivision Entrance Signs. Subdivision name signs at entrances to developments must be approved
as part of the development permitting and an encroachment permit. Subdivision name signs will be
located outside the road right-of-way except those signs located within a roadway median. All signs
shall be located outside of horizontal sight distance. Such signs, foundations for future signs, and
conduit for electrification of signs shall be shown on the construction plans and an encroachment
permit obtained prior to construction. Approval of the plans by the COUNTY does not imply or guarantee
the approval of other entities.
6. Utilities. The proposed concept for the location of all underground utility lines, including water, sanitary
Page 83 of 194
Beaufort County Standards &
Specifications
Page 8
sewer, gas, electrical, communication facilities, shall be shown utilizing typical roadway plans, cross
sections, and profiles. Non-typical locations, such as areas around trees, shall be shown in sufficient
detail for review and approval. Utility lines shall be located so that they will not interfere with the proper
functioning of the drainage system. For roads where a curb and gutter section is used, underground
utility main lines should be a minimum of 5 feet behind the back of the curb. For roads where the swale
ditch section is used, utility main lines should be installed not less than 15 feet from the centerline of
the roadway and not less than 5 feet
from the edge of pavement.
a. The minimum allowable cover over the top of the utility encroachment or other apparatus should be
36 inches. Deviations to the 36 inches cover requirement must be presented in the cross-section
format along with a written justification and submitted to the COUNTY for approval.
b. No work on utility lines within the limits of the proposed publicly maintained right-of-way shall
commence until the roadway plans showing the proposed locations of the utility lines have been
approved. In case any utility location is not provided, the developer shall be responsible for
notifying the utility that installation work within the proposed publicly- maintained right-of-way or
drainage easement will require the approval of the COUNTY.
c. Unapproved utility work within the right-of-way or drainage easement will result in an immediate
suspension of work until such time as the utility plans have been reviewed and approved by the
COUNTY.
d. Trenches or open cuts within the road right-of-way for utilities and/or other purposes shall be
properly backfilled with select material, mechanically compacted in 6-inch layers or flowable fill.
Backfill material shall be compacted to 95 percent of maximum density by method ASTM D 1557
Method A. Temporary patching shall be with a crusher run material or as approved by COUNTY.
Open cuts under pavement or areas to be paved shall be backfilled with flowable fill to the top of
subgrade elevation. The remaining depth to finish grade must be placed back to match the existing
pavement section, including base course material, or better. Open cuts under paved roads will
require the removal of an additional 1 foot of asphalt beyond the open cut in both directions to
allow for a clean asphalt joint. An open cut must be paved back to finish grade or match existing
pavement section within 7 days of excavation unless approved by COUNTY Failure to do so will
result in permit revocation.
e. Flowable Fill. The use of flowable fill is at the discretion of the COUNTY. Refer to Section 210 of the
SCDOT SS for guidance on the use of Flowable Fill. All flowable fill must be excavatable.
f. Steel Plates. Use steel plates within the travel way when backfill operations of an excavation in the
travel way, whether transverse or longitudinal, cannot be properly completed within a workday.
Steel plate bridging will be required to preserve unobstructed traffic flow within the roadways. In
such instances the following applies:
i. Steel plates must be able to withstand H-20 traffic loading without any movement.
ii. Steel plates shall be fabricated to meet ASTM A36 steel requirements.
iii. When two or more plates are used, the plates shall not be stacked on top of each other,
and vertical movement should be reduced as much as practical.
iv. Steel plates shall be installed to resist bending, vibrations, etc., under traffic loads and
shall be anchored securely to prevent movement. If these conditions are not met, the
applicant will be required to backfill and pave the excavation daily or use alternative
methods such as “Plate Locks” and/or ramps which are designed to secure the plates
with minimum noise and vibration. The use of “asphalt patch ramps” are not
permitted.
Page 84 of 194
Beaufort County Standards &
Specifications
Page 9
v. There shall be a minimum 12-inch overlap of the steel plate onto the surrounding
roadway.
vi. A “Steel Plate Ahead” sign that meets the MUTCD standards shall be used to warn
the
traveling public.
vii. All steel plates shall be properly marked with the contractor’s name.
viii. The use of steel plates is at the discretion of the COUNTY.
g. Where utilities have been designed to be placed at a depth or location such that the repair of that
utility would adversely impact the flow of vehicular traffic, the design professional shall either
address such concerns to the satisfaction of the COUNTY or redesign the utility layout. At grade
or above gradeinfrastructure shall not be placed within the travel way or drainage path
unless specifically approved by the encroachment permit. The
landowner/developer/utility provider may be required to obtain additional right-of-way or
easements to accommodate the proposed utility.
h. Utilities crossing under the roadway shall be at an angle of not more than 30 degrees from the
perpendicular to the road. All pipe to be sleeved or ductile.
i. The jetting or uncontrolled tunneling of utility lines under a paved road is not permitted. The cutting
of the pavement is not permitted except under extreme circumstances and only as permitted by
the COUNTY.
j. Proposed street lighting facilities (poles, fixtures, bulbs, lumens, etc.) shall be shown on the
roadway construction plans submitted to the Beaufort County Engineering Department for
approval.
k. The COUNTY will only permit utilities other than drainage facilities within drainage easements upon
specific written authorization.
l. Encroachments of storm drainage pipes greater than 15 inches will require outfall protection with
side slope stabilization for the full width of the ditch, swale, or canal (top of bank to top of bank),
and upstream and downstream of the encroachment for a minimum of 15 feet or greater in each
direction, dependent on-site conditions, and velocity of stormwater.
D. Zoning Permits. The COUNTY will review encroachment permit applications for signs and structures within
public right-of-way for compliance with this ordinance. No encroachment permits for signs, other than
traffic control signs, will be issued without the written approval of the COUNTY. Issuance of a zoning permit
does not ensure approval by the COUNTY.
E. Restoration of Infrastructure. Restoration is intended to aid proper county road maintenance. Any entity
performing work within County right-of-way that will damage an existing road, drainage system, or structure
must ensure that the systems will be returned to a condition equal to or better than that prior to
proposed/current construction work.
1. Any utility, public agency, or other entity or person performing work in a county right-of-way or easement
must obtain an encroachment permit prior to beginning any construction. The applicant shall furnish
information on the encroachment permit application detailing all work. Details on restoration of all
disturbed areas or utilities will also be provided on the encroachment permit application.
2. A precondition assessment shall be performed for access roads by contractor to help repair damage to
the roadway for 500 ft each direction.
3. Restoration work will return the road, drainage system, and any impacted utilities to prior condition or
better. The liability of the permittee will not be released until all work is inspected and approved by the
Page 85 of 194
Beaufort County Standards &
Specifications
Page
10
COUNTY.
F. Encroachment Permit Checklist.
1. Below are the minimum guidelines for submitting exhibits to Beaufort County:
A. All permits must be signed and dated and include:
- Name of road
- Width of right-of-way
- Width of pavement
- Distance to centerline of nearest intersection
- North arrow
- Location map
- Written description of work to be performed
- Drawing scale
- Pavement repair details
B. Utility Permits Must Also Include:
- Traffic Control Plan
- Boring & trenching details
- Details of pipes & sizes
- Depth below existing ground of utilities
- Utilities shown at a minimum of 5 feet from edge of pavement distance from edge
of pavement to utility
- Existing easements Shown
- Curbing detail (if curbing is disturbed)
- Sidewalk location and detail (if sidewalk is disturbed)
C. Road Tie-In Permits Must Also Include:
- Speed limit
- Sight distance
- Sight triangles
- Road or driveway profile
- Typical pavement section
- Angle of intersection
- Drainage flow direction
- Distance between driveways
- Catch basin/ditch section details (drainage plan)
- Adjacent driveways/roads
CHAPTER 3. CONTRACTS
3.1 OPEN SECTION
Page 86 of 194
Beaufort County Standards &
Specifications
Page
11
CHAPTER 4. DRIVEWAYS, SCHOOL ACCESS DESIGN, STREET
INTERSECTIONS, AND SIGHT DISTANCE
4.1 General Information
A. Driveways
1. Residential
a. Refer to Chapter 2.1, Section C of this manual.
b. Refer to Encroachment Permit.
c. Refer to SCDOT (SD), 720-405, 720-410, and 720-415.
2. Commercial
a. Refer to Chapter 2.1, Section C of this manual.
b. Refer to Chapter 3 of the ARMS Manual, latest edition.
c. Refer to SCDOT (SD), 720-405, 720-410, and 720-415.
B. School Access Design
1. Refer to Chapter 4 of the ARMS Manual, latest edition.
C. Street Intersections
1. Refer to Chapter 5 of the ARMS Manual, latest edition.
D. Sight Distance
1. Refer to Chapter 7 of the ARMS Manual, latest edition.
CHAPTER 5. SIDEWALKS, TRAILS, AND CURB & GUTTER
5.1 General Information
A. Sidewalks, Multiuse Paths, and Trails. Sidewalks shall be concrete unless approved by COUNTY. When
placed within the public right-of-way, pedestrian ways shall be constructed as specified below:
1. Asphalt Sidewalk. An asphalt sidewalk shall have a minimum asphalt thickness of 1-1/2 inches and a
minimum stone base course thickness of four (4) inches. The minimum width for pedestrian ways shall
be five (5) feet. All work, materials, methods, and equipment, unless specified otherwise herein, shall
be in accordance with the SCDOT (SS). For additional ADA requirements see Chapter 5.1 section 3, ADA
Requirements.
2. Concrete Sidewalk. A concrete sidewalk shall have a minimum thickness of four (4) inches except at
driveways where the minimum thickness shall be six (6) inches. Concrete shall have a minimum 28-day
compressive strength of 3,000 psi. Contraction joints shall be placed at intervals of not more than ten
Page 87 of 194
Beaufort County Standards &
Specifications
Page
12
(10) feet and transverse expansion joints shall be placed at intervals of not more than fifty (50) feet. The
minimum width for pedestrian ways shall be six (6) feet. All work, materials, methods, and equipment,
unless specified otherwise herein, shall be in accordance with the SCDOT (SS) and SCDOT (SD).
3. ADA Requirements. All pedestrian ways shall be in accordance with the latest edition of the Americans
with Disabilities Act Accessibility Guidelines (ADAAG) and the SCDOT (SS).
B. Crosswalks. Any deviation from Standards shall require approval by COUNTY and meet the minimum ADA
requirements.
C. Curb and Gutter.
1. Types of Curb and Gutter
a. Concrete Curb and Gutter. Either upright curb and gutter or roll curb and gutter may be used (see
details in SCDOT (SS), Section 720). If upright curb and gutter is utilized, driveway entrances for
subdivision lots shall be shown on the construction plans and constructed as part of the
development. The distance between construction joints and expansion joints, unless specified
otherwise herein, shall be in accordance with the SCDOT (SS).
b. Asphalt Curb and Gutter. Asphalt curb and gutter sections shall be submitted for approval. All
work, materials, methods, and equipment, unless specified otherwise herein, shall be in
accordance with the SCDOT (SS).
2. ADA Requirements. All curb construction shall be in accordance with the latest edition of the Americans
with Disabilities Act Accessibility Guidelines (ADAAG) and the SCDOT (SS).
CHAPTER 6. TRAFFIC CONTROL DEVICES
6.1 Work Zone Traffic Control
Refer to the SCDOT Standard Drawings 600 Specification and MUTCD for information.
a) Lane restrictions on Bluffton and Buckwalter Parkway from 9PM to 6AM.
b) Follow all other lane restrictions per the SCDOT.
6.2 Traffic Control Signage
Refer to the SCDOT Standard Drawings 600 Specification and MUTCD for
information. 6.3 Signals
SEE APPENDIX "A"
6.4 Pavement Markings
It is the intent of Beaufort County to incorporate these guidelines on all future roadway resurfacing and
roadway construction projects, unless otherwise noted. Stop bars shall be installed on roads where not
currently present as budget permits.
Materials:
1. All materials and installation methods shall conform to South Carolina Department of
Transportation (SCDOT) Standard Specifications for Highway Construction, most recent edition,
and all SCDOT supplemental and technical specifications, unless otherwise detailed by County
Engineering staff.
Placement Guidelines:
Page 88 of 194
Beaufort County Standards &
Specifications
Page
13
Consider the following guidelines for installation of pavement markings.
1. All Roads: The following apply to all County maintained roads:
• Installed Raised Pavement Markers (RPM) on all paved County maintained roads. Spacing of
RPMs shall be forty (40) feet longitudinally, unless otherwise specified.
• Do not include edge lines on streets with curb and gutters.
• For all roads that have a paved shoulder, include an edge line at the edge of the travel way,
leaving the paved shoulder beyond the edge line.
• Stop bars shall be installed on all County maintained roadways.
• All longitudinal striping shall be four (4) inch width unless otherwise specified.
2. Primary Roads:
• All primary roads shall have both center and edge line pavement markings. Do not include edge
lines on roads with curb and gutter.
• Longitudinal striping shall be six (6) inch width on routes with speeds exceeding forty-five
(45) miles per hour (mph) and with Average Daily Traffic (ADT) of ten thousand (10,000)
vehicles or greater.
3. Secondary Roads:
• Include centerline and edge line pavement markings on all rural secondary roads that are at
least twenty (20) feet wide and have and ADT of five hundred (500) or greater.
• Centerline pavement markings shall be applied on all roads with a speed limit greater than
thirty (30) mph.
• Centerline and edge line markings may be excluded from subdivision and neighborhood
streets, if speed limits are below thirty (30) mph.
Other Markings:
1. All other pavement markings, including but not limited to, symbols, bike lanes, and other
scenarios not developed in this standard shall be approved by the COUNTY and shall meet all
standards and specifications set forth by SCDOT and the Manual Uniform on Traffic Control
Devices (MUTCD) most recent edition.
Cross Walks:
1. All Roads: The following applies to all County Maintained Roads with signalized intersections.
a. The design of crosswalks shall be in accordance with the SCOT Specific details and
MUTCD standards.
b. If a local government would like to stripe and maintain a crosswalk of a different
pattern, it must at a minimum comply with MUTCD standards:
▪ All striping shall be white.
▪ Solid white lines shall mark all crosswalks. Crosswalk lines shall not be less than 6 inches or
greater than 24 inches in width.
▪ Either transverse or parallel lines shall be used.
2. Primary Roads:
• At the intersection of 4 or more lane roadways where the speed is equal to or greater than 45
mph and the volume of traffic is equal to or greater than 15,000 ADT, then a continental-styled
high visibility crosswalk is to be implemented on all legs of the intersection, unless prohibited
due to unfavorable pedestrian volumes, grades, and sight distance (per the SCDOT ARMS
Manual). The continental crosswalk should consist of a series of wide stripes parallel to the
curb for the length of the crossing. When applicable, continental crosswalks should be designed
with the stripes placed to avoid wheel paths, which can reduce long-term maintenance needs.
3. Secondary Roads:
Page 89 of 194
Beaufort County Standards &
Specifications
Page
14
• At the intersection of 2 or more lane roadways where the speed is equal to or greater than 35
mph and the volume of traffic is equal to or greater than 8,000 ADT, then a standard or ladder-
styled high visibility crosswalk is to be implemented on all legs of the intersection, unless
prohibited due to unfavorable pedestrian volumes, grades, and sight distance (per the SCDOT
ARMS Manual). The ladder crosswalk should consist of two 12-inch-wide white retro-
reflective thermoplastic stripes and a series of wide stripes parallel to the curb for the length
of the crossing.
4. Other Roads:
• At the intersection of 2 or more lane roadways where the speed is no more than 30 mph and
the volume of traffic is equal to or greater than 3,000 ADT, then a standard - style high visibility
crosswalk is to be implemented on all legs of the intersection, unless prohibited due to
unfavorable pedestrian volumes, grades, and sight distance (per the SCDOT ARMS Manual).
The standard crosswalk should consist of two 12-inch-wide white retro-reflective
thermoplastic stripes that delineate the sides of the pedestrian walking area. The stripes
should be transverse to the direction of vehicle travel and parallel to the direction of pedestrian
travel.
5. Colored Pavements:
• Further, FHWA Ruling 3(09)-25I – Application of Colored Pavements – clearly describes
acceptable and unacceptable color and pattern treatments for crosswalks. Local governments
should refer to this ruling when considering designs that differ MUTCD standards. Beaufort
County will assess any variations in local government crosswalk design including graphics or
elaborate designs.
*Note: Crosswalks are required at schools, parks, senior centers, transit stops, hospitals, campuses, and
major public buildings regardless of speed and volume. A crosswalk study will be required at all
unsignalized intersections before implementation, which should include vehicular volumes and speeds,
roadway width and configuration, stopping sight distance, distance to the next controlled crossing,
nighttime visibility, grade, and pedestrian volumes.
Roadways Maintained by other Jurisdictions:
It is the intent of Beaufort County to have a distinct striping plan utilized throughout the County. All roads
falling within the County shall utilize this plan as detailed below:
1. The County will incorporate this plan, at its own expense, on all SCDOT & municipally maintained
roadways when resurfacing or undertaking projects on routes not maintained by the County, if
approved by the SCDOT or municipality.
2. This plan will be utilized if a roadway falls within a municipality but is maintained by the
County/SCDOT. If the municipality would like markings or signage to adhere to a different
standard (such as a town/city design standard), then the municipality will be responsible for
funding the difference in construction costs between the standards.
6.5 Traffic Calming
Refer to the Beaufort County Traffic Calming Guidelines, latest edition.
CHAPTER 7. TRAFFIC IMPACT ANALYSIS (TIA)
Page 90 of 194
Beaufort County Standards &
Specifications
Page
15
7.1 Purpose, and Intent, and Applicability
This section of the ordinance establishes requirements for the analysis and evaluation of traffic impacts
associated with development. A traffic impact analysis (TIA) will be required with applications for rezoning,
preliminary plans, single-site development site plans, and encroachment permit applications. The following
provides the guidelines for the preparation of these TIAs. The estimate of the number of trips generated by
proposed developments will be based on the Institute of Transportation Engineers (ITE) Trip Generation, 11th
Edition, or latest edition at time of study. Other trip generation data collected locally may be used where
approved by the COUNTY.
A. A traffic impact analysis (TIA) study will be required for new developments when the proposed
development is projected to generate 50 or more trips during the peak hour of the traffic
generator or the peak hour of the adjacent street traffic (7:00 - 9:00 a.m. or 4:00 - 6:00 p.m.).
Proposed developments that do not meet this threshold may also be required to complete a
traffic study as determined by the COUNTY.
B. A traffic impact study will be required for a change or expansion at an existing site that results
in an expected increase of 50 or more trips during the peak hour of the traffic generator or the
peak hour of the adjacent street traffic (7:00 - 9:00 a.m. or 4:00 - 6:00 p.m.), or if the COUNTY
determines that the change or expansion of the existing site will have significant impact at
the existing access points, proposed access points, or surrounding intersections.
C. A driveway traffic analysis may be required if trip generation is projected to be below the
thresholds above at the request of the COUNTY.
7.2 TIA Requirements
The following criteria shall be used to evaluate the findings of traffic impact analyses:
1. A traffic impact analysis study shall be prepared in accordance with SCDOT standards.
2. Level of service (LOS). The results of the TIA shall inform and contemplate the traffic mitigation
measures necessary to ensure that the minimum service standards established herein are met
during the required planning horizon. The Future No-Build conditions LOS for study area
intersections, measured using the latest Transportation Research Board's Highway Capacity
Manual standards for LOS calculation, shall be maintained in the Future Build conditions. If a
reduction in the LOS is unavoidable, required improvements shall be identified to most effectively
and practically minimize the reduction in operational LOS. Post-development operational LOS
shall meet a LOS D goal for study area intersections. If LOS for an unsignalized intersection is found
to be LOS E or F, mitigation measures should be reviewed, and discussion included in the report
on potential side street queuing.
3. Number of access points. The number and spacing of access points shall comply with applicable
standards set forth in the SCDOT Access and Roadside Management Standards (ARMS manual)
and any designated Access Management Plans in the County’s Community Development Code
or any other access management planning in development. This shall be coordinated with
Beaufort County staff during the development of the TIA.
7.3 Traffic Study Preparation and/or Review
At the sole expense of the Applicant, the TIA shall be prepared by a traffic engineer licensed in South Carolina
who is experienced in the conduct of traffic analysis, and whom is one of the consultants previously selected for
On-Call traffic engineering services by the County. Applicant shall coordinate with Beaufort County staff on details
Page 91 of 194
Beaufort County Standards &
Specifications
Page
16
of the project to develop the scope of services for the TIA.
1. The Applicant shall provide the following information to County staff as part of the Applicant’s
request
for a TIA:
a. Total acreage for the project.
b. Description of the type of use(s) proposed and existing use or last known use.
c. Concept or sketch plan showing total square footage for the buildings (existing and
proposed), the number and type of dwelling units proposed, square footages floor area
by land use type, planned point(s) of access, proposed roads, internal accesses,
bike/pedestrian facilities, and any other transportation infrastructure or facilities, and
parking areas.
d. Projected buildout year when the site will be substantially occupied.
e. The project’s civil engineer shall design on-site vehicle circulation, queuing, and parking
patterns so as not to interfere with the flow of traffic on any public street, including
intersections and meets all SCDOT and Beaufort County driveway standards including
sight distance requirements. The project’s civil engineer shall ensure that no blocking of
internal driveways shall occur. Cross access shall be required between parcels, where
applicable.
f. The Applicant shall provide a site plan with driveway sight distance triangles, edge-to-
edge distance to adjacent driveways and intersections, and a demonstration that the
number of driveways proposed is the fewest necessary that provide safe and efficient
traffic operations.
g. Documentation of any pre-coordination with SCDOT regarding access location(s).
2. After determination of the scope of services, the County’s On-Call consultant shall provide a cost
estimate of such services to the COUNTY for review. An invoice shall be sent to the Applicant who
shall provide payment in an amount equal to the estimated cost to the COUNTY. The notice to
proceed will be provided by staff to the County’s On-Call consultant once the payment is
received.
3. Additional fees for services may be required if the Applicant substantially amends an application
and/or the consultant's appearance is requested at meetings beyond what was anticipated in the
initial scope of services. The Applicant shall remit payment to the COUNTY for these costs before
the services are provided.
7.4 TIA Required Components
The TIA shall include the following components unless otherwise coordinated with the COUNTY.
A. Existing conditions. Description of existing traffic conditions, including existing peak-hour traffic
volumes adjacent to the site and LOS for study area intersections. Existing traffic signal timings
should be used. Morning (a.m.) and evening (p.m.) peak hour turning movement counts from 7:00
a.m. to 9:00 a.m. and from 4:00 p.m. to 6:00 p.m., respectively, taken on a Tuesday, Wednesday, or
Thursday when area K-12 public and private schools are in session shall be used.
Other peak periods may need to be counted, as determined by the COUNTY, based on the specifics of
the project. This would be determined during the TIA scoping process. Seasonal data collection or
Page 92 of 194
Beaufort County Standards &
Specifications
Page
17
conversion to represent seasonal conditions may be requested for TIAs on Hilton Head Island. Existing
counts may be used if taken within 12 months of the submittal of the TIA, unless authorized by the
COUNTY. Other information that may be required to be collected may include, but is not limited to, crash
data, stopping sight distances, and 50th and 85th percentile speeds.
B. Proposed land use. As provided by the Applicant, a description of the current and proposed land
use including characteristics such as the number and type of dwelling units, square footage of the
floor area, accompanied with a project site plan (with buildings identified as to proposed use) and
a schedule for construction of the development and any proposed development stages should also
be included in the TIA.
C. Estimate of trip generation. As noted previously, the projected trips for the development should be
based on the most recent edition of the ITE Trip Generation Manual. Local trip generation studies
may be conducted if previously approved by the COUNTY. A table should be provided in the report
outlining the categories and quantities of land uses, with the corresponding trip generation rates or
equations, and the resulting number of trips. For large developments with multiple phases, the
table should be divided based on the trip generation for each phase.
Any reductions due to internal trip capture (to a maximum of 20 percent) and pass-by trips (to a
maximum of 10 percent of adjacent street traffic), and modal split should be justified and documented.
All trip generation and trip reduction calculations and supporting documentation shall be included in the
report appendix. Internal capture and pass-by should be based on ITE and National Cooperative Highway
Research Program (NCHRP) methodologies.
For developments that do not have a final site plan, the highest and best use of the parcel shall be used
in the TIA.
D. Trip distribution and traffic assignment. The trip distribution of the projected trip generation to the
adjacent street network and study area intersections shall be included in the report and the basis
should be explained.
E. Internal circulation, queuing and parking patterns. The TIA will generally review the on-site vehicle
circulation, queuing, and parking patterns to confirm that the flow of traffic is not impeded on any
public street or surrounding intersections and the driveway design meets SCDOT and Beaufort
County driveway standards for driveway width, throat, and sight distance requirements and cross
access is included on the plan if applicable.
F. Planning horizon. The TIA shall be performed for the year the development will be substantially
occupied. The buildout year for the development shall be provided by the Applicant. If the
development is planned to be phased, the phase year shall be provided by the Applicant.
G. Growth and Approved developments. In addition to the non-specific yearly growth, approved yet not
constructed developments within the vicinity of the site shall be included in the Future No-Build and
Build conditions. The approved developments to include in the study shall be coordinated with
COUNTY and SCDOT staff.
H. Future Year Analysis and Identification of Improvements. A capacity analysis should be performed
at each of the intersections and driveways (signalized and unsignalized) in the study area.
Page 93 of 194
Beaufort County Standards &
Specifications
Page
18
Intersection analysis shall include LOS determination for the overall intersection or approach
depending on the type of control at the intersection in the No-Build (without the development) and
Build (with the development) conditions based on the latest HCM methodologies.
If the capacity analysis indicates that an intersection does not meet the LOS standard, a mitigation
analysis will be conducted to identify the improvements needed to meet the LOS standard.
If the capacity analysis indicates that an intersection does not meet the LOS standard for No-Build
conditions, a mitigation analysis for Build conditions will be conducted to determine the improvements
needed to be completed for the project to accomplish the LOS and delay in No-Build conditions or better.
I. Access management standards. The report shall include the Applicant provided site plan showing
and description of the proposed access points and compare it to the applicable SCDOT and
Beaufort County standards and/or plans.
J. Auxiliary turn lane requirements. TIAs shall evaluate the need for right- and left-turn lanes at all
project driveways. Right- and left-turn lanes shall be installed in accordance with the criteria and
warrants contained in SCDOT's ARMS Manual.
K. Traffic signalization. If a traffic signal is proposed as a mitigation measure, a preliminary traffic
signal warrant analysis based on the Manual on Uniform Traffic Control Devices (MUTCD) shall be
included in the study. While the installation of a traffic signal on projected volumes may not be able
to be initially installed as the project traffic volumes are not yet realized, the Applicant shall provide
funds for the future signal(s) to the County to deposit into an escrow or special account set up for
this purpose, if future installation of a traffic signal(s) is approved. The Applicant is also responsible
for conducting the
future traffic signal warrant studies at the direction of the County.
The Applicant should make any turn lane improvements during construction so that if in the horizon year
a signal is warranted, one may be installed with little impact to the intersection.
L. Mitigation and alternatives. The TIA should include proposed improvements or access management
techniques as necessary to meet the LOS standards. The COUNTY will be responsible for final
determination of mitigation improvements required to be constructed by the Applicant as a part of
the development. Any improvements identified for the project including any future traffic signal
installations are above and beyond any transportation impact fees.
7.5 Coordination with SCDOT
The draft TIA shall be submitted to SCDOT and other applicable municipalities for review and comment. Any
SCDOT comments or requirements shall be incorporated in the study. These comments shall be coordinated with
County staff and shall be addressed prior to the finalization of the traffic study.
7.6 Review and Acceptance of Traffic Impact Analysis
The COUNTY shall also review and approve the traffic study once all County and SCDOT comments are addressed.
The COUNTY shall issue a memo or similar documenting the approval of the traffic study and the required
mitigation associated with the project.
Page 94 of 194
Beaufort County Standards &
Specifications
Page
19
7.7 Expiration Traffic Impact Analysis
The COUNTY may require an update to a previously approved TIA if any of the following criteria are met:
• If a proposed development does not commence within 12 months of the TIA.
• If the scale, intensity, or phasing of the proposed development that were contemplated in the
approved TIA are modified.
• If the number of access points, location of access points, or type of access points (right-in/right-out
driveway, full access driveway, etc.) that were contemplated in the approved TIA are modified.
• If the built environment dictates a change in land use or traffic distribution from what was
previously contemplated within an approved TIA.
• If the proposed development is not completed within the proposed buildout date utilized in the TIA.
CHAPTER 8. ROADSIDE ENCROACHMENTS
8.1 Refer to Chapter 9 of the ARMS Manual, latest edition and the following:
A. Any object placed within Beaufort County right-of-way easements that is not installed by the County or it’s
representative shall require an approved encroachment permit prior to installation. Mailboxes do not
require a permit; however, installations shall meet the guidelines in the SCDOT ARMS manual and Section
57-7-210 of the South Carolina Code of Laws.
B. The permittee will be required to maintain any item allowed in County right-of-way in perpetuity.
C. Homeowner’s Associations are allowed to apply for encroachment permits for objects constructed in County
right-of-way. These include subdivision entrance signs and landscaping. Irrigation and lighting installed under
a roadway must be encased in conduit. The permittee will be responsible for repairing any damage to
roadways caused by the failure or maintenance of permitted equipment.
D. Irrigation installed within County right-of-way is at the risk of the property owner. Irrigation shall not spray
water onto the roadway or walkway surface at any time.
E. A property owner will be notified of any illegally placed object or obstruction within County right-of-way or
easements and will have 30 days to move the object. The County will remove any object not removed by the
property owner within the 30-day period.
F. No encroachment shall impede sight distance.
CHAPTER 9. DRAINAGE, ENVIRONMENTAL, AND EROSION CONTROL
9.1 Refer to the SOLOCO Manual for information.
Page 95 of 194
Beaufort County Standards &
Specifications
Page
20
CHAPTER 10. BRIDGES, CULVERTS AND RETAINING WALLS
10.1 Refer to the SCDOT Bridge Manual (latest edition) for information.
CHAPTER 11. CONSTRUCTION
11.1 General Information
A. The landowner/developer responsibilities include:
1. Providing the County complete roadway and/or drainage system plans for the proposed development.
2. Securing South Carolina licensed and professional personnel to prepare designs acceptable to the
County.
3. Overseeing and coordinating the presentations, reviews, and revisions of the designs with the
appropriate agencies, and obtain required approvals and permits.
4. Providing field staking of the designs during the construction phase.
5. Coordinating County encroachment permit approval and subsequent inspections with the Engineering
Department.
6. Providing third-party materials testing/inspections and/or quality control testing documentation to
COUNTY.
7. Once the improvements proposed for public dedication are constructed, inspected, and approved by
the County, the landowner/developer shall provide as-built record drawings, record plats, etc. to the
COUNTY prior to final County acceptance of publicly dedicated roads. As-built record drawings must
comply with Section F of this chapter and shall be submitted to the Beaufort County Engineering
Department for review and approval. Once the as-built drawings are approved by the COUNTY, the
public dedication request will be scheduled for a County Council Committee meeting for
recommendation and subsequent County Council meeting for final determination. Final plats that
include public dedications of roads and/or drainage will not
be recorded until and unless County Council approves the dedication request(s), and all conditions of such
approval are addressed prior to final plat recording.
B. Coordination with other Reviewing Agencies. The design professional of record shall provide a list of all
regulatory permits required for the construction of all road and drainage systems This list shall include the
status of each permit along with corresponding application numbers and dates. The design professional-of-
record shall provide a copy of all approved permits, deemed essential by the COUNTY to the COUNTY prior
to final approval of the construction plans.
C. Right-of-Way Width. The minimum Right-of-Way width for a Roadway to be accepted into the County
maintenance system is 50 feet unless otherwise approved by the COUNTY. Refer to the Beaufort County
Dirt Roads Manual for more information on dirt roads.
D. Pedestrian Ways within Publicly Dedicated Right-of-Way. When pedestrian ways are provided within the
publicly dedicated right-of-way, they shall be constructed in accordance with Chapter 5.1 section 3, ADA
Requirements, unless otherwise approved by the COUNTY. For roadways with open roadside drainage
systems, pedestrian ways shall be placed behind the swales or ditches. For roadways with closed system
drainage systems, pedestrian ways shall have a minimum 5 ft of separation from the back of curb or edge of
Page 96 of 194
Beaufort County Standards &
Specifications
Page
21
pavement. Additional right-of-way or easements may be required to accommodate proposed pedestrian
ways.
E. General Requirements for Construction Plan Approval. The design professionals shall prepare and submit
one copy of roadway plans and profiles, including typical sections, drainage data, etc., to the Zoning and
Planning and COUNTY for review and approval prior to beginning construction of the roadway and drainage
systems. The designer's seal, signature, and South Carolina registration number shall be affixed to the plans
and specifications.
The Public Works Department reserves the right to request an electronic CAD or GIS file of the approved plans
including layout, road/right-of-way location, drainage easements, and other pertinent information that may be
used to augment the County GIS to be submitted with the as-built documents.
Construction drawings at a minimum shall include the following, if applicable as determined by the Directors of
the Zoning and Planning and Engineering Departments:
1. Roadway Design plans and profiles shall be prepared on 24-inch x 36-inch or 22-inch x 34-inch sheets,
having a profile at the bottom and a plan view at the top, with both the plan and profile stationing
oriented in the same direction. Residential and commercial plans may have a different sheet layout per
the approval of COUNTY.
2. All elevations shall be referenced to the NAVD 88. State horizontal plane national NAV83.
3. Scales shall be vertical 1 inch=2 feet and horizontal 1 inch= 50 feet or larger. The following shall be
shown in plan view:
a. Stations along the centerline of the proposed road with appropriate ties at intersecting streets.
b. The width of the right-of-way and names of proposed roads as approved by the Consolidated
9-1-1 Center (CDC), and names of existing roads.
c. Alignment information, curve data with P.C., P.T., and P.I. angle points, as well as angles
at intersections.
d. Arrows indicating the direction of drainage flow within the right-of-way.
e. Size, type, and location of trees proposed to remain within the clearing limits of the road right-
of-way.
f. DES /OCRM critical line and USACE jurisdictional wetland delineations which relate to the
right-of-
way or easements.
g. Existing and proposed drainage structures and drainage easements along with rights-of-way
and drainage way cross sections.
h. Benchmarks with locations, descriptions, coordinates, datum, etc.
i. Existing and proposed utility lines and utility easements.
j. Road cross sections with sidewalks (when required).
k. Details shall show sight distances, traffic control devices, design speeds for roads, and other
related information.
l. Other general construction details required to define the scope of work. Profiles shall show:
I. Existing road centerline elevations showing all breaks in grade, but in no case more
than 100’ feet apart. Profiles shall include existing roads to which ties are being made
Page 97 of 194
Beaufort County Standards &
Specifications
Page
22
with elevations extending approximately 200’ feet from the intersection.
II. Proposed street centerline profile with centerline elevations every 50’ feet on vertical
curves and at 100’ feet along tangents and at intersections.
III. Vertical curve data.
IV. Proposed and existing storm drains, sanitary sewers, water mains, pipe under drains,
and cross line pipes.
V. Proposed grades of all ditches and swales on or off site. Show existing grades of
incoming and outfall drainage ways for 200’ feet upstream/downstream if no grade
changes are proposed. An overall drainage plan shall be submitted along with the
plans and profiles and detail sheets.
VI. The drainage plan sheet shall show the street layout and the entire drainage system to
be constructed or improved, along with the sizes and invert elevations of drainage
pipes, the widths of proposed and existing drainage easements, the direction of
drainage flow (using arrows), detention ponds, outfall structures, lot drainage,
existing canals, tidal streams, etc.
VII. The drainage plan shall include pertinent drainage data such as drainage areas,
runoff coefficients, times of concentration (with computations), runoff volumes,
soils data, detention pond routing, pond crest elevations, and other related
information.
The following statements shall be included on the plans:
1. Statement to be placed by design professionals on road and drainage plans: "ALL MATERIALS AND
WORKMANSHIP SHALL BE IN ACCORDANCE WITH REQUIREMENTS OF THE COUNTY DEVELOPMENT
CODE."
2. Statement to be signed by the COUNTY or the authorized agent of the owner: “I certify as an agent for or
as a record owner, lessee, or record easement holder, I have or will have prior to undertaking the work
the necessary approval or permission from all other persons with a legal interest in said property to
conduct the work proposed in the approved subdivision construction plans."
F. Expiration Date for County's Approval of Construction Plans. Construction plan and specification approvals
have the same duration as the preliminary plat approval. Refer to CHAPTER 8, Subdivision Regulations, for
approval duration information.
G. County Inspection. All work required by the County for the project shall be inspected by the COUNTY
for
compliance with the approved plans and specifications. Inspections will be made to verify the materials and
workmanship of the contractor are meeting the contract specifications. Inspections will include material sampling
and testing, material inspections, construction observation and monitoring, and/or proof roll inspections. The
level and frequency of inspections will be sufficient to demonstrate quality assurance of the work as determined
by the County. The COUNTY will make inspections when:
a. The COUNTY has approved construction plans and specifications.
b. Sufficient notice is given. The contractor/developer shall give a one-week notice to the COUNTY prior to
beginning work at the site. After the initial notice, a 72-hour notice shall be given prior to beginning each
operation (or continuing an operation when the work has been disrupted for more than one workday).
c. A final project inspection shall be performed prior to scheduling the request for Council
consideration. The inspector shall have the authority to:
Page 98 of 194
Beaufort County Standards &
Specifications
Page
23
1. Certify that the construction and materials comply with the approved construction plans and
regulations.
2. Certify that material quantities comply with the approved construction plans.
3. Approve or reject materials and/or their installation in accordance with the approved construction
plans, specifications, and regulations.
4. Suspend work with the approval of the COUNTY.
H. Site Cleanup and Finish Grading. Prior to roadway and drainage system acceptance, the right-of-way and
drainage easements shall be cleared of all construction trash and debris. Lots or other areas designated on
the approved plans requiring fill or grading shall also be completed.
I. Maintenance Guarantees. Roadway and stormwater management/drainage systems that are to be
dedicated to Beaufort County for public ownership and maintenance shall be under warranty for all defects
and failures as described in this Section for a period of one (1) year. Prior to Final Plat approval, the Developer
shall provide written verification of financial responsibility for correction of defects and/or failures to
systems to be dedicated to the County. The warranty (minimally established at 20 percent of the
construction cost) shall be in an amount satisfactory to the COUNTY and effective for a period of two years
from County Council’s acceptance date, provided, however, that period may be extended at the COUNTY’S
discretion. The financial warranty shall be in the form of a no-contest, irrevocable bank letter of credit, a
performance and payment bond underwritten by an acceptable South Carolina licensed corporate surety,
or a cashier’s check. Payment is subject to County Attorney approval of the guarantee to determine that the
interests of Beaufort County are fully protected. If a cashier’s check is utilized, then the opinion of counsel
may be waived. The Beaufort County Engineering Department shall maintain surveillance over the system
and provide written notification to the landowner/Developer if repair work is required during the warranty
period. The Beaufort County Engineering Department shall identify defects not considered to be a public
safety issue and notify the landowner/Developer of such defects. The landowner/Developer shall have 30
days to prepare and submit a schedule of corrective actions for approval by the COUNTY. If defects are not
satisfactorily repaired within the approved schedule, the Beaufort County Engineering Department will
resolve the defects and bill the bonding company accordingly. The Beaufort County Engineering Department
shall address public safety defects immediately. Subsequently, the bonding company will be billed for
reimbursement.
J. Road Classifications and Traffic Data. Roadways in the County system are classified as one of the following:
a. Minor Rural
b. Secondary Rural
c. Local
Page 99 of 194
Beaufort County Standards &
Specifications
Page
24
d. Collector
e. Arterial/Industrial
11.2 Minor Rural Road Standards
A. Classification
1. Maximum of 10 Lots or 100 ADT.
2. Proposed paved speed limit under 30 mph.
3. Road length less than 0.5 mile and not identified as cut-through resulting in higher ADT.
B. Design Requirements.
1. Required Right-Of-Way. The standard right-of-way width is 50 feet. Reduced right-of-way width may be
accepted on a case-by-case basis.
2. Required Minimum Typical Section. Roads shall have a minimum travel way width of 18 feet. Ditch
sections will consist of a minimum shoulder width of 3 feet, 3:1 maximum front slope, and 2:1 maximum
back slope for ditches. Any fixed objects (electric poles, trees, etc. must be a minimum of 2 feet from
the back of curb or 4 feet from edge of travel way.
3. Required Minimum Road Elevations. The minimum road centerline elevation at finish grade shall be
elevation 7.5 based on NAVD 88.
4. Required Minimum Profile Gradient. The minimum road profile centerline gradient shall be 0.5% except
for causeways where land areas adjacent to the road embankment are jurisdictional wetlands or OCRM
Critical Area or as approved by COUNTY.
5. Road Centerline Minimum Curve Radius Criteria. Road centerline curve radii shall meet AASHTO
guidelines for the design speed limit.
6. The design professional shall provide supporting design data, including traffic control signage,
supporting the design speed.
7. All roads shall be designed with a minimum road centerline radius of 125 feet.
8. Horizontal sight distances shall be considered in the design process.
9. Vertical curves shall have a minimum length of 100 feet.
C. Roadway Drainage Design. The roadway drainage design must show, at a minimum, how the drainage is
directed away from the travel way. Refer to the SOLOCO Manual for spread calculations of 25-year storm
events and ponding within travel lanes.
D. Clearing and Grubbing. Minor rural road right-of-way shall be cleared and grubbed for a minimum width of
30 feet or to the required limits of disturbance. Tree canopies shall be pruned to a minimum height of 16.5
feet. Tree removal shall comply with the Beaufort County tree ordinance.
11.3 Secondary Rural Road Standards
A. Classification
1. Maximum of 400 ADT.
2. Proposed paved speed limit under 40 mph.
3. Road is in a rural setting with a low residential density per mile and no commercial traffic.
B. General Design Requirements.
1. Required Right-Of-Way. The required right-of-way width is 50 feet.
Page 100 of 194
Beaufort County Standards &
Specifications
Page
25
2. Required Minimum Typical Section. Roads shall have a minimum travel way width of 20 feet. Ditch
sections will consist of a minimum shoulder width of 3 feet, 3:1 maximum front slope, and 2:1 maximum
back slope for ditches. Any fixed objects (electric poles, trees, etc. must be a minimum of 2 feet from
the back of curb or 5 feet from edge of travel way.
3. Required Minimum Road Elevations. The minimum road centerline elevation at finish grade shall be
elevation 7.5 based on NAVD 88.
4. Required Minimum Profile Gradient. The minimum road profile centerline gradient shall be 0.5% except
for causeways where land areas adjacent to the road embankment are jurisdictional wetlands or OCRM
Critical Areas.
5. Road Centerline Minimum Curve Radius Criteria. Road centerline curve radii shall meet AASHTO
guidelines for the design speed limit.
6. The design professional shall provide supporting design data, including traffic control signage,
supporting the design speed.
7. All roads shall be designed with a minimum road centerline radius of 125 feet.
8. Horizontal sight distances shall be considered in the design process.
9. Vertical curves shall have a minimum length of 100 feet.
C. Roadway Drainage Design. Refer to the SOLOCO Manual for information
D. Clearing and Grubbing. Secondary Rural Road right-of-way shall be cleared and grubbed for a minimum
width of 40 feet or to the required limits of disturbance. Tree canopies should be pruned to a minimum
height of 18.0 feet. Tree removal shall comply with the Beaufort County tree ordinance.
E. Clearing of Drainage Easements. The full width of all drainage easements shall be cleared of trees,
buildings, fences, stumps, brush, logs, rubbish, roots, overhanging tree limbs, overhanging utility wires or
cables, or any other item that may, in the judgment of COUNTY interfere with the drainage facility or the
maintenance of the facility. Existing obstacles may be left in place upon approval of COUNTY provided that
all of the following criteria are met:
1. The drainage system or obstacle cannot be easily relocated.
2. Adequate and safe operational easement space for maintenance by mechanized equipment is provided.
3. The drainage way is not obstructed.
4. The drainage easement width is increased to accommodate the obstructions.
Tree removal shall comply with the Beaufort County tree ordinance.
11.4 Local Road Standards
A. Classification
1. Maximum of 750 ADT.
2. Road is in a residential or commercial setting with very little truck traffic.
3. Road feeds into a collector road or highway.
B. General Design Requirements.
1. Required Right-Of-Way. The minimum required right-of-way width is 50 feet.
2. Required Minimum Typical Section. Roads shall have a minimum travel way width of 22 feet. Ditch
sections will consist of a minimum shoulder width of 4 feet, 3:1 maximum front slope, and 2:1
Page 101 of 194
Beaufort County Standards &
Specifications
Page
26
maximum back slope
for ditches. Any fixed objects (electric poles, trees, etc.) must be a minimum of 2 feet from back of curb or
5’ from the edge of travel way or as approved by COUNTY.
3. Required Minimum Road Elevations. The minimum road centerline elevation at finish grade shall be
elevation 7.5 based on NAVD 88.
4. Required Minimum Profile Gradient. The minimum road profile centerline gradient shall be 0.5% except
for causeways where land areas adjacent to the road embankment are jurisdictional wetlands or OCRM
Critical Areas.
5. Road Centerline Minimum Curve Radius Criteria. Road centerline curve radii shall meet AASHTO
guidelines for the design speed limit.
6. The design professional shall provide supporting design data, including traffic control signage,
supporting the design speed.
7. All roads shall be designed with a minimum road centerline radius of 125 feet.
8. Horizontal sight distances shall be considered in the design process.
9. Vertical curves shall have a minimum length of 100 feet.
C. General Requirements of Design of Drainage Systems. Refer to the SOLOCO Manual for information.
D. Roadway Drainage Design. Refer to the SOLOCO Manual for information.
Outfall ditches to wetland areas shall be piped for a minimum length of 20 feet at their outfall ends, or an
alternative means of defining wetlands’ limits for maintenance identification purposes shall be submitted for
consideration.
E. Maintenance Plan. When Best Management Practices (BMPs) are required by local or state agencies or
proposed by the design professional, a maintenance plan must be provided in accordance with the
SOLOCO Manual.
F. Clearing and Grubbing. Local Road right-of-way shall be cleared and grubbed for the full right-of-way width.
Refer to current tree ordinance for pruning and/or removal. Tree removal shall comply with the Beaufort
County tree ordinance.
G. Clearing of Drainage Easements. The full width of all drainage easements shall be cleared of all trees,
buildings, fences, stumps, brush, logs, rubbish, roots, overhanging tree limbs, overhanging utility wires or
cables, or any other item that may, in the judgment of the COUNTY interfere with the drainage facility or the
maintenance of the facility. Refer to current tree ordinance for pruning and/or removal. Existing obstacles
may be left in place upon approval of the COUNTY provided that all of the following criteria are met:
a. The drainage system or obstacle cannot be easily relocated.
b. Adequate and safe operational easement space for maintenance by mechanized equipment is provided.
c. The drainage way is not obstructed.
d. The drainage easement width is increased to accommodate the
obstructions. Tree removal shall comply with the Beaufort County tree
ordinance.
Page 102 of 194
Beaufort County Standards &
Specifications
Page
27
11.5 Collector Road Standards
A. Classification
1. Over 750 ADT.
2. Road is in a residential or commercial setting. Serves other residential roads and is main connection to
highway network. In commercial settings, has up to 5% truck traffic.
B. General Design Requirements.
1. Required Right-Of-Way. The minimum right-of-way width is 50 feet; however, the road right-of-way
must be of sufficient width to provide for the following:
a. Drainage
b. Pavement and curb and gutter
c. Shoulders
d. Trees
e. Signage
f. Sidewalks where installed (or required)
g. Utilities such as streetlights and overhead/underground utility lines (electric, telephone, cable TV,
gas, water, and sewer).
2. Required Minimum Typical Section. Roads shall be constructed with curb and gutter and have a
minimum travel way width of 22 feet or 11-foot travel lanes.
3. Required Minimum Street Elevations. The minimum road centerline elevation at finish grade shall
be elevation 7.5 based on NAVD 88.
4. Required Minimum Profile Gradient. The minimum road profile centerline gradient shall be 0.5%
except for causeways where land areas adjacent to the road embankment are jurisdictional wetlands
or critical areas.
5. Road Centerline Minimum Curve Radius Criteria. Road centerline curve radii shall meet AASHTO
guidelines for the design speed limit.
6. The design professional shall provide supporting design data, including traffic control signage,
supporting the design speed.
7. All roads shall be designed with a minimum road centerline radius of 125 feet.
8. Horizontal sight distances shall be considered in the design process.
9. Vertical curves shall have a minimum length of 100 feet.
C. General Requirements for Design of Drainage Systems. Refer to the SOLOCO Manual for information
D. Roadway Drainage Design. Refer to the SOLOCO Manual for information.
E. Subsurface Drainage.
1. Where pipe under-drains are required (based on Geotechnical Report), their centerline shall be located
3.0 feet, at a minimum, behind the back of curb and shall be properly connected to a permanent drainage
outlet, such as a catch basin, junction box, or a manhole.
2. Piped underdrains shall conform to the underdrain details in section 802 of the SCDOT (SS). Underdrain
Page 103 of 194
Beaufort County Standards &
Specifications
Page
28
inverts shall be a minimum of 24 inches below the bottom of the curb and above any static lake/pond
elevation.
3. Suitable outlets for the pipe under-drains shall be provided in the drainage system design.
4. Pipes under-drains shall be installed at low points in the grade on both sides of the road for a minimum
distance of 100 feet in each direction along the road; except at locations where the design engineer can
demonstrate to the satisfaction of the COUNTY that the water table will not be within 24 inches of
centerline subgrade elevation.
5. Pipes underdrains, where required, shall be installed before the base course is placed.
6. Pipes underdrains shall be placed in other locations as determined by the design professional or as
required
by the COUNTY during construction.
7. Pipe underdrains shall be properly laid on grade, in accordance with these specifications, the SCDOT
(SS), and shall not be covered until they have been inspected and approved by the COUNTY.
8. Alternative under-drain designs shall be presented to the COUNTY for review and approval.
F. Maintenance Plan. When Best Management Practices (BMP) are required by local or state agencies or
proposed by the design professional, a maintenance plan must be provided in accordance with the
SOLOCO manual.
G. Piping and Easements. Unless justification is provided, to the satisfaction of the COUNTY all drainage
easements within the urban areas of the County shall be required to follow the SOLOCO manual.
H. Clearing and Grubbing. Collector road right-of-way shall be cleared and grubbed for the full right-of-way
width. Tree removal shall comply with the Beaufort County tree ordinance.
I. Clearing of Drainage Easements. The full width of all drainage easements shall be cleared of all trees,
buildings, fences, stumps, brush, logs, rubbish, roots, overhanging tree limbs, overhanging utility wires or
cables, or any other item that may, in the judgment of the COUNTY interfere with the drainage facility or the
maintenance of the facility. Existing obstacles may be left in place upon approval of the COUNTY provided
that all of the following criteria are met:
9. The drainage system or obstacle cannot be easily relocated.
10. Adequate and safe operational easement space for maintenance by mechanized equipment is provided.
11. The drainage way is not obstructed; and
12. The drainage easement width is increased to accommodate the
obstructions. Tree removal shall comply with the Beaufort County tree
ordinance.
11.6 Arterial/Industrial Road Standards
A. Classification
1. Over 750 ADT.
2. Road is in a commercial setting such as an industrial park. Has high ADT, multi-lane or median typical
section, and has considerable truck traffic.
B. General Design Requirements.
1. Required Right-Of-Way. The minimum right-of-way width is 66 feet; however, the road right-of-way
must be of sufficient width to provide for the following:
a. Drainage
Page 104 of 194
Beaufort County Standards &
Specifications
Page
29
b. Pavement and curb and gutter
c. Shoulders
d. Trees
e. Signage
f. Sidewalks where installed (or required)
g. Utilities such as streetlights and overhead/underground utility lines (electric, telephone, cable TV,
gas, water, and sewer).
2. Required Minimum Typical Section. Roads shall have a minimum lane width of 12 feet. Roads shall
have a cross-slope of 2% unless specified in roadway design guidelines or approved by the COUNTY.
Closed drainage
systems shall consist of barrier curb. Ditch sections will consist of a 6-foot shoulder, maximum 3:1 front slope
and maximum 2:1 back slope.
3. Required Minimum Road Elevations. The minimum road centerline elevation at finish grade shall
be elevation 7.5 based on NAVD 88.
4. Required Minimum Profile Gradient. The minimum road profile centerline gradient shall be 0.5%
except for causeways where land areas adjacent to the road embankment are jurisdictional wetlands
or critical areas.
5. Road Centerline Minimum Curve Radius Criteria. Road centerline curve radii shall meet AASHTO
guidelines for the design speed limit.
a. The design professional shall provide supporting design data, including traffic control signage,
supporting the design speed.
6. All roads shall be designed with a minimum road centerline radius of 125 feet.
7. Horizontal sight distances shall be considered in the design process.
8. Vertical curves shall have a minimum length of 100 feet.
C. General Requirements for Design of Drainage Systems. The design of drainage facilities for a development
must be done with consideration being given to the entire drainage basin. Provisions must be made to
receive and manage runoff from upstream areas and to ensure that downstream areas are not adversely
impacted by discharges or runoff. The current zoning of upstream properties and associated runoff factors
representing that land use, assumed to be fully developed, shall be used in determining design runoff rates
and quantities. It is not to be assumed that existing developed properties without storm water detention
systems will have them in the future. Drainage design requirements for the entire development shall
conform to the SOLOCO Manual.
D. Roadway Drainage Design. Stormwater systems conveying flow to or from roads shall be piped unless
otherwise approved by the COUNTY. Curb inlet structures shall be located so that drainage shall not be
carried in gutters for a distance exceeding 500 feet (accumulated distance). The 10-year average return
frequency storm shall not cause water to flow onto the road for a spread width greater than 5 feet. Culvert
piping running longitudinally with the road shall not be located under the pavement or curb and gutter, nor
shall it conflict with the normal location of under drains.
E. Subsurface Drainage.
1. Where pipe underdrains are required, their centerline shall be located 3.0 feet, at a minimum, behind
the back of curb and they shall be properly connected to a permanent drainage outlet, such as a catch
Page 105 of 194
Beaufort County Standards &
Specifications
Page
30
basin, junction box, or a manhole.
2. Piped underdrains shall conform to the underdrain details in section 802 of the SCDOT (SS). Underdrain
inverts shall be a minimum of 24 inches below the bottom of the curb and above any static lake/pond
elevation.
3. Suitable outlets for the pipe underdrains shall be provided in the drainage system design.
4. Pipe underdrains shall be installed at low points in the grade on both sides of the road for a minimum
distance of 100 feet in each direction along the road; except at locations where the design engineer can
demonstrate to the satisfaction of the STORMWATER DEPARTMENT that the water table will not be
within 24 inches of centerline subgrade elevation.
5. Pipe underdrains, where required, shall be installed before the base course is placed.
6. Pipe underdrains shall be placed in other locations as determined by the design professional or as
required by the STORMWATER DEPARTMENT during construction.
7. Pipe underdrains shall be properly laid on grade, in accordance with these specifications, the SCDOT
(SS), and
shall not be covered until they have been inspected and approved by the STORMWATER DEPARTMENT.
8. Alternative underdrain designs shall be presented to the STORMWATER DEPARTMENT for review and
approval.
F. Maintenance Plan. When Best Management Practices are required by local or state agencies or proposed by
the design professional, a maintenance plan must be provided in accordance with the SOLOCO manual.
G. Piping and Easements. Unless justification is provided, to the satisfaction of the STORMWATER
DEPARTMENT all drainage easements within the urban areas of the County shall be required to follow the
SOLOCO Manual.
H. Clearing and Grubbing. Except as otherwise stated herein, all arterial/industrial road rights-of-way shall
be cleared and grubbed for the full width of the right-of-way. Any/all tree canopies shall be pruned to a
minimum height of 16 feet. Selected specimen trees may be permitted to remain within the right-of-way
when the following conditions are met:
1. Trees are healthy, of aesthetic value, and are firmly rooted with the base of the tree being at or near
the elevation of the curb or edge of pavement.
2. The distance from the back of the curb to the nearest face of the tree is not less than 6 feet. If no
curb is present, the distance from the edge of pavement to the nearest face of the tree must be no less
than 10 feet.
3. Additional right-of-way is provided where necessary.
Tree removal shall comply with the Beaufort County tree ordinance.
I. Clearing of Drainage Easements. The full width of all drainage easements shall be cleared of all trees,
buildings, fences, stumps, brush, logs, rubbish, roots, overhanging tree limbs, overhanging utility wires or
cables, or any other item that may, in the judgment of the COUNTY interfere with the drainage facility or the
maintenance of the facility. Existing obstacles may be left in place upon approval of the STORMWATER
DEPARTMENT provided that all of the following criteria are met:
1. The drainage system or obstacle cannot be easily relocated.
2. Adequate and safe operational easement space for maintenance by mechanized equipment is provided.
3. The drainage way is not obstructed; and
4. The drainage easement width is increased to accommodate the obstructions.
5. Tree removal shall comply with the Beaufort County tree ordinance.
Page 106 of 194
Beaufort County Standards &
Specifications
Page
31
11.7 Road Design
A. Dead Ends.
1. Cul-de-Sac Streets. Cul-de-Sac Streets shall be provided at the terminus of closed end roads with a
minimum radius of 40 feet.
2. Temporary Cul-de-Sacs. Temporary cul-de-sacs shall be provided when incremental road construction
and/or phasing is requested by the developer. Temporary cul-de-sacs shall be constructed as required
by this section. Unpaved temporary cul-de-sacs shall require an additional 2 inches (compacted depth)
of base course.
3. Construction Access. The design professional shall identify the development's construction access
routes and submit its proposed road section and surface course design for approval by the COUNTY.
4. Inverted Crown Roads. Roads designed or constructed with inverted crowns shall not qualify for public
road acceptance by Beaufort County.
B. Pavement Design.
1. All pavement design shall be verified and/or provided by a design professional.
2. Pavement Base and Surfaces Courses. The base course shall meet the County Standards or the SCDOT
(SS). All inspection of work shall have a certification in the particular area that is being inspected
(SCDOT Earthwork & Base, SCDOT HMA Roadway, etc.). The width of the base course shall be 12 inches
greater than the width of the surface course, i.e., 6 inches on each side of the roadway. The compacted
depth of the base course shall be 6 inches or greater as approved by the COUNTY. After the base course
has been properly blended, mixed, wetted, shaped, and compacted to the approved typical section and
has been seasoned sufficiently and proof-rolled, the surface course shall be applied.
a. Proof-rolling shall be accomplished as described in the County Standards or the SCDOT (SS) for the
proof-rolling of the subgrade except that the minimum total weight of the testing vehicle shall be in
the 30-to 35-ton range.
b. The surface course materials, placement, and protection shall meet the requirements of the SCDOT
(SS) type C or equal. The compacted depth of the surface course shall be no less than 2 inches or
greater over 6 inches of base course as approved by the COUNTY. Weather and seasonal
restrictions to placement of the bituminous materials are described in the County Standards or the
SCDOT (SS).
3. Pavement Section for Typical Residential Roadway. The County standard asphalt pavement section for
use on residential roadways is a minimum 2 inches (220 lbs/SY) of compacted hot plant mix asphaltic
concrete meeting the County Standards or the SCDOT (SS), type C surface course. This material is to be
placed on a 6-inch minimum compacted base course and an approved subgrade. A prime coat meeting
the County Standards or the SCDOT (SS) is required when the base course will not be paved within one
week.
Roadways serving large residential areas or phased subdivisions may require pavement designs, exceeding
the minimum requirements, as determined by the COUNTY.
Asphalt compaction is to meet the minimum requirements in the SCDOT (SS).
4. Pavement Design for Commercial/Industrial Use Roadways. The design engineer shall provide a
pavement design for all roadways that serve commercial and industrial uses. The design shall include
at a minimum 2 inches of compacted hot plant mix asphaltic concrete meeting the County Standards
or the SCDOT (SS) type one, or equal, and a minimum 6 inches of compacted base course meeting the
COUNTY STANDARDS or the SCDOT (SS), with an approved subgrade. The pavement design shall
Page 107 of 194
Beaufort County Standards &
Specifications
Page
32
include information on anticipated traffic counts, traffic loadings, and site-specific soils. Further, the
COUNTY may require other pertinent information. A site-specific geotechnical report prepared by a
geotechnical engineer shall be provided to substantiate/justify the proposed design for the entire length
of the roadways to be constructed. A prime coat meeting the County Standards or the SCDOT (SS) is
required when the base course will not be paved within one week.
5. Alternative Pavement Designs. The County will consider alternative pavement materials designs. The
design professional should present appropriate design data including laboratory tests of foundation
soils to substantiate/justify the proposal.
11.8 Construction
A. Soil Testing. The COUNTY will determine the quality of foundation soils by visual observations and
adequate soil testing provided by the design professional. Without such testing, the COUNTY will utilize
judgment and experience to determine the quality of the foundation material and shall require
appropriate action including, but not limited to, undercutting or mucking and replacing the excavated
material with suitable earth materials. The contractor is responsible for providing quality control
testing.
B. Grading. Roads shall be graded to the designed typical section in accordance with the approved plans
and profiles. Grade stakes shall be set on centerlines at intervals of not more than 100 feet on tangent
grades and not more than 50 feet on vertical curves. Additional grade stakes may be required to ensure
that the final grade matches the designed typical section in the profile.
a. Grading work, materials, methods, and equipment, unless approved otherwise, shall be in
accordance with the requirements of the County Standards or the SCDOT (SS).
b. No base or surfacing materials shall be placed before the subgrade is inspected and approved by
the COUNTY.
c. In general, soils classified lower than “SC,” according to the Unified Soil Classification System, are
not
acceptable for the upper 24 inches of the Subgrade.
d. The compacted subgrade shall be proof rolled prior to placement of any base or surfacing
materials. Testing shall be performed in the presence of Beaufort County Engineering Department
or their designee. The testing procedure shall follow the SCDOT specifications. Any areas exhibiting
pumping or breaking of the surface shall be stabilized or removed to appropriate depth and
replaced with suitable material, recompacted, and retested.
C. Subgrade. Work shall consist of the construction and preparation of subgrade - the part of a roadway
intended to receive the base course, pavement, pedestrian way, curb and gutter, and/or shoulders.
a. Roads shall be graded to the designed typical section in accordance with the approved plan and
profile, and shall be free of roots, trash, and other unsuitable materials for a minimum depth of 18
inches below the finished subgrade.
b. A suitable soil is required for a minimum depth of 18 inches immediately below the base course to
provide a road that will serve the traffic needs in extremely dry, normal, and in wet weather. Where
necessary, a stabilizing-type soil shall be added and properly mixed with the soil in place for a depth
of not less than 6 inches.
c. When unstable material is encountered and it is necessary to perform mucking work, the roadway
shall be mucked for its entire width, ditch line to ditch line or extending 2 feet beyond the back of
curb; backfilled with a suitable, stable-type soil; and properly compacted. All objectionable loose
rock or boulders shall be removed or broken off to a depth of not less than 18 inches below the
surface of the subgrade. Granular stone or geotextile materials may be approved by Beaufort
County Engineering Department as a bridge lift.
Page 108 of 194
Beaufort County Standards &
Specifications
Page
33
d. The subgrade is to have sufficient moisture content and shall be compacted for a width extending 2
feet outside the edges of the proposed pavement before the base course is placed.
e. Subgrade lift material shall be compacted to not less than 95 percent of maximum density per SC-
T-29 & 30 for lift thicknesses over 6 inches. Maximum loose lift thickness for embankment and
subgrade soils is 8 inches. Density testing will be required once every 500 linear feet in alternating
lanes and a minimum of 3 tests per road. The entire subgrade will be inspected by Beaufort County
Engineering Department via proof roll prior to approval of placement of base course.
f. The subgrade shall be maintained in a smooth and compacted condition, free from ruts and
depressions, and shall be adequately drained. In no case shall any base, surface course, or
pavement be placed on a frozen, muddy, or unstable subgrade. Storing or stockpiling of materials
directly on the subgrade will not be permitted except with the approval of Beaufort County
Engineering Department.
D. Base Courses. Following the COUNTY’S approval of subgrade, base course shall be immediately
applied to protect the installed subgrade. The type of base course approved for the pavement design will
follow SCDOT specifications and the following:
a. Aggregate Base Course. Material shall meet SCDOT gradation requirements and be compacted to
a minimum of 98% of maximum density via modified proctor method. Density testing and depth
checks will be required once every 500 linear feet in alternating lanes and a minimum of 3 tests per
road. Tolerances for accepted base course depth will follow SCDOT specifications. Additional
depth checks may be performed to determine extent of unacceptable base lift. A proof-roll
will be required to
approve base course for paving. Moisture content and surface of base must be maintained daily, or
pavement installed within 72 hours of base course approval to avoid placement of prime coat.
b. Sand Clay Base Course. Material shall meet SCDOT gradation requirements and be compacted to
a minimum of 98% of maximum density via standard proctor method. Density testing and depth
checks will be required once every 500 linear feet in alternating lanes and a minimum of 3 tests per
road. Tolerances for accepted base course depth will follow SCDOT specifications. Additional
depth checks may be performed to determine extent of unacceptable base lift. A proof-roll will be
required to approve base course for paving. Moisture content and surface of base must be
maintained daily, or pavement installed within 72 hours of base course approval to avoid
placement of prime coat.
c. Asphalt Base Course. Asphalt base course materials, application, and testing shall follow Section
300/400 of the latest SCDOT specifications. The Contractor will be responsible for providing all
quality control inspections and documentation. Mix designs, load tickets, and test reports shall be
provided to the Engineer and COUNTY.
d. Cement Modified Base Courses. All cement modified base courses are subject to approval by
COUNTY to include earth bases, recycled bases, aggregate modified bases, and reclaimed bases.
Special consideration must be given when considering these methods to the site location,
population density and proximity to housing, weather conditions, and restrictions. Cement
modified bases applied to an existing roadway must be paved between 3-7 calendar days of mixing
or have a surface treatment applied. Cement modified mixes, application procedures, and testing
shall follow the latest SCDOT specifications.
e. Recycled Concrete. Refer to the SCDOT Supplemental Technical Specification (SC-M-306, latest
edition). Other base courses are at the discretion to be approved by Beaufort County.
E. Sidewalks and Curb & Gutter. Requirements for sidewalks and curb & gutter will follow the details
provided in Chapter 5 of this manual and SCDOT specifications. Minimum sampling and compressive
strength testing for concrete will be every 50 CY or one sample per day unless otherwise specified in
Page 109 of 194
Beaufort County Standards &
Specifications
Page
34
the construction documents. Sampling and testing procedures will follow (SS).
F. Closed Storm Drainage systems. The STORMWATER DEPARTMENT accepts drainage systems based on
the Smooth Walled Pipe (SWP) specification. The STORMWATER DEPARTMENT reserves the right to
specify material types in designated locations if it is in the best interest of the County for structural or
maintenance considerations.
a. All materials for pipe, catch basins, drop inlets, manholes, junction boxes, or other structures must
meet latest SCDOT specifications.
b. Backfill requirements under the roadway must meet SC-M-714 technical supplemental
specification. Backfill requirements outside of the pavement structure shall consist of suitable
backfill, clean of debris, and meeting the classifications outlined in Section 200 of the SCDOT
specifications. The STORMWATER DEPARTMENT or their designee shall approve the use of backfill
material.
c. Backfill material shall be compacted to not less than 95 percent of maximum density per SC-T-29
& 30 for at a maximum loose lift thicknesses of 8 inches. Maximum loose lift thickness for
embankment and subgrade soils is 8 inches. Density testing will be required once every 500 linear
feet for pipes outside of the pavement structure and at all crossline pipes under the roadway, per
lift.
d. Video inspect installed stormwater pipe systems in accordance with Section 714.3.11 of the SC-
M-714 technical supplemental specification or as approved by STORMWATER DEPARTMENT.
G. Paving. Asphalt paving materials, application, and testing shall follow Section 400 of the latest SCDOT
specifications. The contractor will be responsible for providing all quality control inspections and
documentation. Mix designs, load tickets, and test reports shall be provided to the Engineer and
the
COUNTY.
a. A pre-pave meeting with the contractor, engineer, inspector, and paving foreman shall be held prior
to HMA surface placement.
b. All HMA mix designs must be approved by the SCDOT prior to use.
c. When it is necessary to maintain traffic on a road or a section of road before prime coat has time to
sufficiently dry to prevent pickup, apply sand, or some approved granular material as a cover as
directed by the COUNTY. The cost of furnishing this material and performing this work shall be
incidental to the cost of the hot mix asphalt.
d. HMA paving shall follow all temperature restrictions provided in the specifications. The COUNTY
may waive any seasonal paving restrictions at their discretion.
e. The COUNTY will allow pay adjustments for asphalt cement fluctuations greater than 5% up or
down from the prevailing base price. This adjustment will be based on SCDOT monthly indexes and
follow Section 401 of the SCDOT specifications. Fuel adjustments for HMA will not be made.
f. Concrete pavements may be approved for use by the COUNTY. If approved, all materials,
application, and testing shall follow Section 500 of the SCDOT specifications.
g. Asphalt surface treatments may be allowed on certain low volume roads as determined by the
COUNTY. Materials, application, and testing shall follow Sections 406-408 of the SCDOT
specifications including the use of lightweight aggregate.
H. Seeding and Stabilization. All unpaved and disturbed areas within county right-of-way or limits of
disturbance shall meet the stabilization requirements provided in the plans, applicable permits and
under SOLOCO, unless governed by SCDOT SC-M-810 Specification (latest edition). The contractor
shall be responsible for use of best management practices (BMPs) necessary to control sediment on-
site throughout construction. The COUNTY shall complete and sign the SCDOT Seeding Inspection
Page 110 of 194
Beaufort County Standards &
Specifications
Page
35
Form at the time of installation. The contractor will maintain the site during construction, placing
temporary seeding for disturbed areas that are inactive for two weeks, establishing permanent
vegetation, and the maintenance of areas until the project is accepted by the COUNTY. If the project is
permitted under an NPDES permit, all requirements and activities must meet the conditions of the
permit.
I. Traffic Control/Signage. Traffic control items and permanent signage shall meet the requirements of the
Manual on Uniform Traffic Control Devices (MUTCD), Section 600 of the latest SCDOT specifications,
any applicable permits, or otherwise approved by the COUNTY.
a. The contractor/developer is responsible for maintaining and resetting signage on an existing road
project.
b. The contractor/developer is responsible for providing all signage required on a new roadway. Street
names will be approved by the COUNTY and color requirements will be provided.
c. If detailed traffic control plans are not provided, a predetermined Traffic Control Plan (TCP) shall
be submitted 7 days prior to the start of work for approval by the COUNTY.
d. If requested, the COUNTY may approve temporary road closings to help facilitate the completion
of work. The request must be given with sufficient notice to review, approve, and notify school
districts and public safety of the closing. Road closings must provide access to property by local
traffic and follow the hours of operation.
e. Failure to provide traffic control equipment and procedures meeting these requirements will result
in a stop work order and possible reduction in traffic control maintenance payments.
f. Striping plans will be at the discretion of BCE/PW. Any striping/marking materials shall meet MUTCD
and
SCDOT specifications.
CHAPTER 12. LANDSCAPING GUIDELINES
12.1 Refer to the County Development Code for information.
CHAPTER 13. DIRT ROADS
Dirt Road Improvement Policy
July 29, 2026
Beaufort County is committed to improving public dirt roads where citizens desire and as funding becomes
available. The first step is always to determine if the dirt road is in the public roadway system and if so, how
much available right of way is there.
If the road is not in the public system, then Policy Statements 15 and 17 provide guidance for bringing them into
the public system. Certain requirements must be met for consideration to bring any private road into the
Beaufort County roadway system. These include:
Page 111 of 194
Beaufort County Standards &
Specifications
Page
36
The road cannot be owned on both sides by one owner, which the County defines as a “private driveway”.
The road must be directly accessible from a public road.
The road must serve at least six (6) dwelling units.
A “Road Acceptance Application” must be submitted and signed by all associated property owners.
Final decision on acceptance will be determined by a vote of County Council.
Process:
For roads that are in the public system and the residents agree to improvement, then this policy provides
guidelines for that process.
Beaufort County Engineering Department will conduct a site visit to determine right of way needs and road
section. Other required elements for paving shall be considered at this time.
The Beaufort County Right of Way Manager will then verify the deeded right of way that exists in the public road
system, determine any additional right of way needs and prepare the preliminary letter to residents about right
of way acquisition.
Right of Way Manager will follow the approved procedure to formalize County Right of Way for the road (see
Ordinance 2025/30).
When formal right of way has been secured, the road can be included in the Dirt Road Improvement Plan
according to where it would normally fall due to established criteria.
Each year, based on available funding, roads will be included in that year’s dirt road improvement contract.
These roads will follow the design-build model of construction following the County’s standard specifications
and drawings.
Roadway Prioritization:
A five-year dirt road improvement plan is prepared and adopted by Council every several years. The plan
preparation includes an evaluation of all County maintained dirt roads. Roads are evaluated based on
condition, right-of-way, and traffic volume. Approximately 40 roads have full right-of-way out 172 roads that the
County maintains. About 20 of those are included in the current five-year plan. County will prioritize obtaining
right-of-way for roads in the order that they are ranked in the evaluation. If right-of-way is obtained prior to the
next evaluation, the roadway ranking will be reconsidered based on having full ROW but will not be prioritized
over those currently on the five-year plan.
Page 112 of 194
Beaufort County Standards &
Specifications
Page
37
Aggregate Surfaced Roads:
Roadways that will be surfaced with aggregate should be constructed in approximate accordance with the
FHWA Gravel Roads Construction and Maintenance Guide, as applicable, and meet the following
specifications.
Roads shall be surfaced with graded aggregate base course (GABC) meeting SCDOT standards and
specifications, as appropriate, or approved alternate. Local materials shall be prioritized.
Recycled concrete shall not be used for roadway surface.
Asphalt millings may be utilized if approved by staff. Millings shall not be used as standalone surface material,
unless prior approval is received, but must be mixed with clean aggregate to achieve an approved gradation.
Aggregate shall be constructed to achieve six (6) inch compacted thickness minimum.
Roadway surface must receive adequate moisture conditioning and compaction so that it will pass a proofroll
with a fully loaded tandem axle dump truck with minimum rutting, pumping, or observable surface
deformations.
Road surface shall be sloped to maintain positive drainage.
Design Standards:
The following design standards shall be used on all dirt roads in the Beaufort County roadway system unless
otherwise directed by the Beaufort County Engineering Director.
Geotechnical exploration shall be performed. SPT borings or hand augers with DCP should be extended, at a
minimum, every 500’ going from right-center-left. Borings should be extended to a depth great enough to
achieve relevant design information.
At least one (1) infiltration test shall be performed per roadway.
Roadway surface section will be determined based upon available ROW, geotechnical exploration, and other
design considerations.
The standard road section will have 1 ¾” (192.5 lb./sy) surface “C” hot mix asphalt (HMA) with 6” graded base
course as a minimum. Within SCDOT ROW road section shall be 2” surface “C”, 2” intermediate “C” asphalt on
8” graded aggregate base. Pavement section shall be verified using SCDOT Pavement Design methodology or
AASHTO 93.
Roadway geometry shall be determined based on existing alignment and available right of way. Refer to
Beaufort County Right of Way Acquisition Plan.
Page 113 of 194
Beaufort County Standards &
Specifications
Page
38
Standard lane width is 10’ but the minimum allowed shall be 9’ for a multilane roadway.
All roads shall include adequate area for the turnaround of emergency vehicles.
The proposed road improvements shall comply with any and all appropriate design criteria for the prevailing
road use and nature of traffic. The design and construction will also have to be in compliance with the current
edition SCDOT Standard Specifications and the current edition of the Manual on Uniform Traffic Control
Devices and all SCDOT
Supplements. The County utilizes as appropriate the SCDOT specifications as part of the construction
requirements for all County roadways.
Right of Way Requirements:
A 50’ right of way is required for a standard roadway. Below are design variances to be permitted only as
approved by the Beaufort County Engineering Director based on available right of way.
20’ ROW
Pervious Paving
Asphalt
Concrete
Geocell
30’ ROW
Asphalt/Microsurface/Chipseal
Single slope with ditching
Cub and Gutter
Valley Gutter
40’ ROW and greater
Asphalt/Microsurface/Chipseal
Regular crown with ditching
Construction Standard Practices:
The contractor shall have approved third party quality control testing throughout the project.
Page 114 of 194
Beaufort County Standards &
Specifications
Page
39
Beaufort County may provide approved third-party quality assurance testing and inspections. Testing shall
adhere to SCDOT specifications with the following exceptions:
Subgrade
Proofroll the subgrade in accordance with section 211 of the SCDOT Standard Specifications.
Provide Nuclear Gauge Density Test SC-29 &30, approximately every 500’ staggering the test from left-center-
right-center-left with a minimum 5 tests per road. Subgrade shall be compacted to a minimum of 95% density.
Aggregate Base
Proofroll the base in accordance with section 211 of the SCDOT Standard Specifications.
Provide nuclear gauge density test SC-T-30 approximately every 500’ staggering the test from left-center-right-
center-left with a minimum of 5 tests per road. Base shall be compacted to a minimum density of 98% density.
Laboratory proctor of aggregate base shall be used as comparison using ASTM D1557.
Asphalt
Asphalt QA/QC shall follow SCDOT standards.
Contractor shall submit all test reports and accompanying load tickets to the Beaufort County Engineering
Department within 48 hours of the work being completed. Forms to include 400.1, 400.2, 400.4, and AS1.
The paving schedule during the calendar year shall be based on local conditions, engineering considerations
and environmental considerations.
Striping and signage shall follow Beaufort County Standards, SCDOT standards and the Manual of Uniform
Traffic Control Devices (MUTCD).
Alternative methods for dirt road improvements shall be at the discretion of the Beaufort County Engineering
Director based on available right of way, roadway usage, traffic volume, and other design considerations.
Page 115 of 194
Beaufort County Standards &
Specifications
Page
40
CHAPTER 14. RIGHTS OF WAY
14.1 OPEN SECTION
Definitions
ADT (Average Daily Traffic). The average number of vehicles per day that pass over a given point.
Access. A way or means of approach to provide vehicular or pedestrian entrance or exit to a property.
Access Classification. A ranking system for roadways used to determine the appropriate degree of access management.
Factors considered include functional classification, the appropriate local government's adopted plan for the roadway,
subdivision of abutting properties, and existing level of access control.
Access Connection. Any driveway, street, turnout, or other means of providing for the movement of vehicles to or from
the public roadway system.
Access Management. The process of providing and managing access to land development while preserving the regional
flow of traffic in terms of safety, capacity, and speed.
Access Road. A street designed to provide vehicular access to abutting property and to discourage through traffic.
Alley. A public or private street designed to serve as secondary access to the side or rear of those properties whose
principal frontage/access is on another street.
Applicant. Any authorized agent, entity, or person(s) submitting an application for development.
Arterial Street. Carry longer-distance major traffic flows between important activity nodes. Conveys traffic between
nodes. They are designed to provide high-speed, high-level service for efficient movement of people and goods.
As-built. A map, plan, or layout showing the location and boundaries of land including existing utility lines and facilities.
Berm. A mound of soil, either natural or man-made, intended to buffer land uses or limit access.
Bike path. A surfaced or unsurfaced path designated for use by non-motorized cycles.
Bikeway. A surfaced pathway designed to be used by non-motorized cycles along the edge of an existing street.
Block. A parcel of land entirely surrounded by streets or highways, railroad right-of-way, waterways, subdivision
boundary, or by a combination thereof.
Buffer. An area within a property or site, generally adjacent to and parallel with the property line, either consisting of
natural vegetation or created by the use of trees, shrubs, and/or berms, designed to continuously limit the view and
Page 116 of 194
Beaufort County Standards &
Specifications
Page
41
sound from the site to adjacent sites or properties.
Building Line. That line which represents the distance that a building or structure must be setback from a lot boundary
line or a street right-of-way line, according to the terms of these regulations or the Zoning Ordinance. In all cases, the
building lines of a lot shall run parallel to and setback the appropriate distance as required by the zoning district in
which the lot is located from street right-of-way lines, street center lines, or other boundary lines.
Collector Street. Link local streets with the arterial street system. They collect traffic in local areas and provide the
connection to arterial streets. They may also directly serve abutting land uses.
Common Area. (See Open Space—Common).
Competent Person. An individual with the necessary training and experience to identify potential hazards within a work
zone, understand traffic control procedures, and have the authority to take corrective actions to ensure the safety of
workers and the public during construction or maintenance activities on a roadway.
Connection Spacing. The distance between connections, measured from the centerline of the first connection to the
centerline of the second connection along the edge of the traveled way.
Corner Clearance. The distance from an intersection of a public or private road to the nearest access connection,
measured from the centerline of the closest edge of the pavement of the intersecting road to the centerline of the
closest edge of the pavement of the connection along the traveled way.
Cross Access Easement. A non-exclusive easement in which a service drive is located that provides vehicular access
between two or more contiguous sites, so the driver need not enter the public street system.
Cul-de-sac. A local street with only one access point and having the other end designed for the reversal of traffic
movement.
Culvert. A structure designed to convey a watercourse, not incorporated in a closed drainage system, under a road,
railway, or pedestrian walk.
Curb. A vertical or upward sloping edge of a roadway usually made of concrete or paving materials.
Density. The permitted number of dwelling units per acre of land to be developed.
Design Standards. Standards that set forth specific improvement requirements as well as layout criteria.
Page 117 of 194
Beaufort County Standards &
Specifications
Page
42
Detention Basin. A pond, pool, or basin used for the storage of water runoff and the controlled release of such runoff
or as otherwise defined in SOLOCO.
Developer. The legal or beneficial owner(s) of a lot of any land included in a proposed development. Also, the holder
of an option or contract to purchase, or any other person having enforceable proprietary interest in such land.
Divided Street. Streets that have an island, median, or other street barrier separating moving lanes.
Driveway. A paved or unpaved area used for ingress or egress of vehicles and allowing access from a street to a building
or other structure or facility. Driveways are not inclusive of public or private roads constructed in accordance with the
design standards found in these regulations.
Easement. A grant of one or more property rights by a property owner to or for use by any person, firm, corporation,
the public, or another person or entity. Not inclusive of fee simple ownership.
Encroachment. Any obstruction in a delineated right-of-way or easement.
Engineer. A registered professional in good standing with the South Carolina Board of Registration for Professional
Engineers and Land Surveyors.
Entranceway treatments. (See Open Space—Common).
Floodplain. Areas subject to periodic flooding which are shown on maps prepared by the Federal Emergency
Management Agency (FEMA) for Beaufort County and are maintained by the Beaufort County Flood Control Officer.
Floodway. The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to
discharge the base flood without cumulatively increasing the water surface elevation more than one foot.
Frontage. See Lot Frontage.
Frontage Road. A public or private drive that generally parallels a public street between the right-of-way and the front
building setback line. The frontage road provides access to adjacent properties while separating them from the
arterial street.
Functional Classification. A system used to group public roadways into classes according to their purpose in moving
vehicles and providing access.
Governing Authority. The Beaufort County Council having jurisdiction in the area and matter involved.
Grade. The slope of a street, public way, or other land, specified in percentage (%) terms.
Greenways. (See Open Space—Recreational).
Gutter. A shallow channel usually set along a curb or the pavement edge of a road for purposes of catching and carrying
off runoff water.
Page 118 of 194
Beaufort County Standards &
Specifications
Page
43
HOA (Homeowner's Association). A group of property owners, established by legal documents, charged with the
management of a development, typically having the right to assess fees.
Intersection. A point where two or more roads cross at a grade.
Island. In street design, a raised curbed area placed to guide traffic and separate lanes or used for landscaping, signage,
or lighting.
Joint Access (or Shared Access). A driveway connecting two (2) or more contiguous sites to the public/private
street system.
Land Contract Sale Parcel. A parcel created through a contractual agreement in which no deed to transfer ownership
occurs until the agreed upon purchase price has been paid in full. The purchaser may or may not be responsible for
the property taxes of the parcel.
Land Development. A change in land characteristics through redevelopment, construction, subdivision into parcels,
condominium complexes, apartment complexes, commercial parks, shopping centers, industrial parks, manufactured
housing communities, or other developments for sale, lease or any combination of owner and rental characteristics.
Renovations, expansions, or up fittings of existing structures shall not be considered a land development.
Lease Parcel. A parcel created for lease, rental, or contractual purposes, and for which the ownership does not change.
Local Street. The lowest order of residential street (See Street Hierarchy). Provides frontage for access to lots and
carries traffic having destination or origin on the street itself. Designed to carry traffic at slow speeds.
Lot. A piece, parcel, tract, or plot of land intended as a unit for building development or other purpose, for sale, rent,
or lease.
Lot, Corner. Any lot having at least two contiguous sides abutting one or more streets, provided that the interior angle
at the intersection of such two sides is less than 135 degrees.
Lot Depth. The average distance measured from the front lot line to the rear lot line.
Lot, Flag. A large lot not meeting the minimum frontage requirements specified in the Beaufort County Zoning
Ordinance and where access to the public road is by a narrow, private easement or driveway.
Lot, Nonconforming. A lot that does not meet the dimensional requirements of the district in which it is located and
that existed before the requirement of the zoning ordinance became effective.
Lot, Through (double frontage lot). A lot that fronts upon two parallel streets or road rights-of-way; or, that fronts
upon two streets or road rights-of-way that do not intersect at the boundaries of the lot.
Lot Frontage. That portion of a lot extending along a street right-of-way line.
Page 119 of 194
Beaufort County Standards &
Specifications
Page
44
Lot of Record. A lot or parcel that exists as shown or described on a plat or deed in the records of the Register of Deeds
Office.
Lot Size. The size of a lot measured within the lot lines and expressed in terms of acres or square feet. Lots created
through the development of land shall meet the minimum size requirements as specified in the zoning ordinance.
Lot Width. The horizontal distance between side lot lines measured parallel to the front lot line at the minimum
required front setback line as defined in the Zoning Ordinance.
Major Development. Developments requiring formal review and approval of the Beaufort County Planning
Commission. Major developments include the following:
a. The creation or extension of any new public street.
b. The creation of a private street greater than 1,800 feet is utilized to obtain access.
c. The creation of more than ten lots/units (including the parent tract) regardless of whether adequate
access already exists.
d. Group developments such as apartment, condominium, and townhouse complexes.
e. Any commercial, industrial, or office land development, of regional significance, on a single tract or
parcel of land that will produce an estimated 5,000 or more average daily trips according to trip
generation rates established by the Institute of Transportation Engineers and established in the
current issue of the ITE Trip Generation Manual.
f. Any portion of a Planned Development District.
Manufactured Home Development. Development of a lot or parcel for the purposes of locating manufactured housing
for the purposes of lease, rental, or sale. Such development shall comply with all platting and improvement
requirements of Articles 2, 3, 4, and 6.
Median. A barrier placed between lanes of traffic flowing in opposite directions.
Median Island. An island in the center of a street that separates opposing traffic
flows. Minor Development.
1. Subdivisions or developments containing no more than ten lots/units (including the parent tract)
where access to a public or private street exists or where a new private street of less than 1,800 feet
is constructed to obtain access.
2. Any commercial, industrial, or office development on a single tract or parcel of land that will produce
between 1,000 and 5,000 average daily trips according to trip generation rates established by the
Institute of Transportation Engineers and established in the current issue of the ITE Trip Generation
Manual.
Natural water bodies. (See Open Space—Recreation).
Off-street Parking Space. A parking space provided outside of street right-of-way such as a parking lot, parking
structure, or private driveway.
On-street Parking Space. A parking space that is located within a dedicated street right-of-way.
Page 120 of 194
Beaufort County Trac Signal
Guidelines
45
Open Space—Common. Improved areas within a land development set-aside for use by all residents in the
community. Common open spaces may include the following:
a. Entranceway Treatments— Areas in the development facing an exterior street in which signs are
placed next to an interior street to inform motorists of the name of the development.
b. Wetlands— Wetlands include swamps, marshes, bogs, and similar areas as determined by the
appropriate regulatory agency.
c. Open Space—Recreational. Areas designed for active or passive uses that are planned, improved,
accessible, and useable by persons living within a development. Recreational open spaces may
include the following:
d. Amenities Areas— Areas within a development in which impervious surfaces are added to provide
recreational opportunities. Amenities areas may include but are not limited swimming pools, tennis
courts, racquetball courts, and shuffleboard courts.
e. Greenways— Open spaces designed to incorporate natural settings such as creeks and significant
stands of trees within neighborhoods that are entirely within a development and do not abut the
exterior boundary of the property. Greenways may be used for certain active uses such as walking,
jogging, or bicycling. A greenway differs from a park or square in that their detailing is natural and/or
informally planted except along right-of-way and may contain irregular topography.
f. Natural or Man-made Water Bodies— Any bay, lake, pond, or river greater than three acres in size and
created by nature.
g. Playgrounds— Playgrounds provide sunny and shaded areas for children as well as open shelter with
benches for parents. Playgrounds may be built within parks or may stand alone within a residential
block.
h. Playfields— Playfields provide areas designed for a variety of sports/athletic activities in which specific
field/ play area dimensions are required. Playfields usually include fields for softball, soccer,
baseball/t - ball, football, and/or volleyball.
i. Plaza— A plaza is an open area adjacent to, or part of, a civic building or facility. Plazas function as
gathering places and may incorporate a variety of non-permanent activities such as vendors and
display stands. Plazas may be left unplanted and may incorporate impervious surfaces.
j. Park— Parks may be designed for passive and/or active recreational uses that create a central space
that serves an entire neighborhood or group of neighborhoods. Parks may incorporate physical
features that are an asset to the community such as lake or river frontage, high ground, or significant
stands of trees.
k. Picnic Areas— Areas designed for an outing or excursion in which those taking part share a meal in an
area in which the land has been only minimally developed. Picnic areas include tables that may be
covered and screened to provide shelter from inclement weather and insects and may include grilles
for cooking.
l. Squares— Squares are areas for passive recreational use. Squares are bounded completely by
streets. A square allows for informal gatherings or child play. They must be improved open space but
Page 121 of 194
Beaufort County Trac Signal
Guidelines
46
cannot be covered with impervious materials.
m. Village Green— Open space which serves as the focal point for a development. Village greens are
typically bounded by streets and contain planted areas. The village green may contain a monument or
gazebo and have civic buildings (churches, community centers, and government buildings) located
around the perimeter of the green.
Open Space, Improved. Cleared of underbrush and debris.
Out-parcel. Any lot created from an overall tract wherein the remaining tract is larger than any single lot created and
wherein the conditions and locations of access to such lot from a public highway or street may be restricted and/or
provided through easements granted by the larger tract holder.
Parcel Split. A lot created through the subdivision of property into two or more parcels, lots, or tracts.
Parent Tract. The original lot, parcel, or tract of land as established in the Beaufort County Assessor's records, from
which the proposed subdivided lot(s), will be split. For the purposes of determining minor or major development
status, a parent tract is reviewed to determine the total number of parcel splits within a ten-year period.
Park. (See Open Space—Recreational).
Parking Lane. A lane usually located on the sides of streets, designed to provide on-street parking for vehicular traffic.
Parking Space. An area provided for the parking of a motor vehicle.
Picnic area. (See Open Space—Recreational).
Plat. A map or drawing upon which a developer's plan of the subdivision of property is presented for approval.
Platting Action. Plats prepared for the purposes of displaying changes to property that are required to be recorded as
legal documents with the Register of Deeds Office and require the review and approval of the Beaufort County Planning
Department. Submittal requirements for such plats are found on the Beaufort County website under the Register of
Deeds.
Playfields. (See Open Space—Recreational).
Playgrounds. (See Open Space—Recreational).
Plaza. (See Open Space—Recreational).
Private Road. Any road or thoroughfare for vehicular travel which is privately owned and maintained, and which
provides the principal means of access to abutting properties.
Public Road. A road under the jurisdiction of a public body.
Reserve Strip. A strip of property directly adjacent to an abutting property line. The property cannot be classified as a
Page 122 of 194
Beaufort County Trac Signal
Guidelines
47
building lot, utility easement, open space, recreation space or buffer yard.
Retention Basin. A pond, pool, or basin used for the permanent storage of water runoff or as otherwise defined in
SOLOCO.
Right-of-Way. Land reserved, used, or to be used for a highway, street, alley, walkway, drainage facility, or other public
purpose. Except for existing county roads located on prescriptive easements, right-of-way as defined herein are
characterized by fee-simple ownership. For roads maintained by the county without fee simple ownership, the right-
of-way shall be measured from the point of the ditch farthest from the centerline of the road.
Setback. The perpendicular distance between the property line and the primary structure and the right-of-way or
easement line. Setbacks for structures shall be as defined in the Beaufort County Zoning Ordinance.
Shoulder. The graded part of the right-of-way that lies between the edge of the main pavement or curb line and the
right-of-way line or ditch.
Sidewalk. A paved path provided for pedestrian use and usually located at the side of the road within the right-of-way.
Sight Triangle. A triangular shaped portion of property included within the right-of-way and established at street
intersections in which nothing is erected, placed, planted, or allowed to grow in such a manner as to limit or obstruct
the sight distance of motorists entering or leaving the intersection. Sight triangles shall adhere to the requirements
established in the most current edition of the SCDOT Highway Design Manual.
Site Plan. An accurately scaled development plan that illustrates the existing conditions on a land parcel as well as
depicting details of a proposed development.
Sketch Plan. A site plan of sufficient accuracy to illustrate a potential development activity.
Storm Water Detention. A provision for storage of storm water runoff and the controlled release of such runoff after
a flood or storm.
Street Hierarchy. The conceptual arrangement of streets based on function. A hierarchical approach to street design
classifies streets according to function, from high-traffic arterial roads down to streets whose function is residential
access. Systematizing street design into a road hierarchy promotes safety, efficient land use, and environmental
quality.
Stub-out (Stub-street). A portion of a street or road used as an extension to an abutting property that may be
developed in the future. May be permitted when a development is phased over a period of time, but only if the street
in its entirety has been approved in the preliminary plan.
Subcollector Street. Middle order of residential streets (See Street Hierarchy). Provides frontage for access to lots and
carries traffic of adjoining residential access streets. Traffic should have origin or destination in the immediate
neighborhood.
Subdivision. The division of a tract or parcel of land into two or more lots, building sites, or other divisions for the
purpose, whether immediate or future, of sale, lease, or building development, and includes all division of land
involving a new street or change in existing streets, and includes re-subdivision which would involve the further
division or relocation of lot lines of any lot or lots within a subdivision previously made and approved or recorded
according to law; or, the alteration of any streets or the establishment of new streets within any subdivision previously
Page 123 of 194
Beaufort County Trac Signal
Guidelines
48
made and approved or recorded according to law, and includes combinations of lots of record; however, the following
exceptions are included within this definition only for the purpose of requiring that the local planning agency be
informed and have a record of the subdivisions:
a. Combining or re-combining portions of previously platted lots where the total number of lots is
not increased and the resultant lots are equal to the ordinance standards.
b. Dividing land into parcels of five acres or more where no new street is involved. The Planning
Commission must receive plats of these exceptions as information and indicate that fact on the
plats.
c. Combining or re-combining entire lots of record where no new street or change of existing
street is involved.
Surveyor. A registered land surveyor in good standing with the South Carolina Board of Registration for Professional
Engineers and Land Surveyors.
Trip. A single or one-way vehicle movement to or from a property or study area.
Utility Coordinating Committee (UCC). A group of representatives from private and public agencies involved in
the development process.
Wetland. Wetlands include swamps, marshes, bogs, and similar areas as determined by applicable regulatory agencies.
Yard. A space on the same lot with a principal building, open, unoccupied, and unobstructed by buildings or structures
from ground to sky except where encroachments and accessory building and structures are expressly permitted.
Yard, Front. A yard situated between the front building line and the front lot line extending the full width of the lot.
Zoning Ordinance. Refers to the Beaufort County Zoning Ordinance.
Page 124 of 194
Beaufort County Trac Signal
Guidelines
49
References
Charleston County, South Carolina. Zoning and Land Development Regulations (ZLDR).
Horry County, South Carolina. 2001. Horry County Land Development Regulations.
Lexington County, South Carolina. 2022. Land Development Manual
South Carolina Department of Transportation (2008 Edition). Access and Roadside Management Standards.
South Carolina Department of Transportation (2021). Standard Drawings.
https://www.scdot.org/business/standard-drawings.html
South Carolina Department of Transportation (2025). Standard Specifications for Highway Construction.
Hodgins, B., G. Hoffmann, and K. Ellis. 2020. “Southern Lowcountry Stormwater Design Manual, Stormwater Best
Management Practices”. Beaufort, SC.
Page 125 of 194
Beaufort County Trac Signal
Guidelines
50
Beaufort County
Traffic Signal Guidelines
January 2026
Page 126 of 194
Beaufort County Trac Signal
Guidelines
51
PURPOSE
The purpose of this guide is to clarify expectations regarding signal design in Beaufort County. It is
intended as a supplement to the following references. These references provide additional details
and should be considered guiding documents that govern this supplement. The signal designer is
responsible for complying with the most current version of each reference.
References
South Carolina Department of Transportation (SCDOT) Traffic Signal Design Guidelines, latest
version
SCDOT Signal Design Specifications, latest version
Manual on Uniform Traffic Control Devices (MUTCD), latest version South Carolina Roadway
Design Manual, latest version
INTRODUCTION
Traffic signals in Beaufort County may be owned by SCDOT, Beaufort County, City of Beaufort, or
Town of Hilton Head Island. The SCDOT-owned traffic signals are maintained by Beaufort County,
City of Beaufort, or Town of Hilton Head Island through respective Signal Maintenance
Agreements with SCDOT. In addition to the Beaufort County assigned traffic signals, there are
some additional traffic signals outside of Beaufort County that are maintained by Beaufort County
on behalf of SCDOT as part of the Beaufort County/SCDOT Signal Maintenance Agreement.
This maintenance agreement also includes school flashers, pedestrian hybrid beacons, and other
sign flashers.
Figure 1 (North of Broad River), Figure 2 (South of Broad River), and Figure 3 (City of Beaufort/Port
Royal) show the locations of traffic signals in Beaufort County and the maintaining agency (City of
Beaufort, Beaufort County or SCDOT). Town of Hilton Head traffic signals are not shown.
Table 1 lists the Beaufort County-owned traffic signals and the traffic signals maintained by
Beaufort County as part of the Beaufort County/SCDOT Signals Maintenance Agreement. This list
is subject to change based on changes to the Beaufort County/SCDOT Signals Maintenance
Agreement and/or any new traffic signal installations on the Beaufort County roadway system.
Page 127 of 194
Beaufort County Trac Signal
Guidelines
52
Table 1:
Beaufort County Owned or Maintained Traffic Signals
Signal ID Number Location Beaufort County Owned Signals
101 US 17 at Big Estate Rd./Jacob White Rd.
103 May River Rd. at Buck Island Rd.
104 SC 46 at Sams Club/ Kitties Crossing
205 Buckwalter Parkway at Buckwalter Place Blvd. X
206 Buckwalter Parkway at Bluffton Parkway (N) X
207 Buckwalter Parkway at Lake Point Dr. X
208 Buckwalter Parkway at Bluffton Parkway (S) X
210 Buckwalter Parkway at McCracken Circle (S) X
212 Buckwalter Parkway at May River Rd. X
304 Bluffton Parkway at River Ridge Rd./ Flat Creek Dr. X
303 Bluffton Parkway at Hampton Parkway X
309 Bluffton Parkway at Buck Island Rd. X
310 Bluffton Parkway at Masters Way/ Crossings Blvd. X
311 Bluffton Parkway at Simmonsville Rd. X
313 Bluffton Parkway at Red Cedar St. X
315 Bluffton Parkway at Burnt Church Rd. X
317 Bluffton Parkway at Tanger Outlets 1 X
318 Bluffton Parkway at Malphrus Rd. X
321 Bluffton Parkway at Buckingham Plantation Dr. X
402 US 278 at I-95 SB Ramps
404 US 278 at Medical Center Dr.
405 US 278 at Lakeside Blvd. N/Latitude Blvd.
411 US 278 at D. Mark Cummings Rd.
414 US 278 at Sun City Blvd.
415 US 278 at Palmer Grace Dr. W/ Okatie Center Blvd. S
416 US 278 at Hampton Parkway
417 US 278 at Buckwalter Parkway
418 US 278 at St. Gregory Dr.
Page 128 of 194
Beaufort County Trac Signal
Guidelines
53
420 US 278 at Rose Hill Way/Whiteoaks Cir
421 US 278 at Belfair Oaks Dr./ Buck Island Rd.
422 US 278 at Belfair Village Dr./ S-474 (Simmonsville Rd.)
423 US 278 at SC 46 (Bluffton Rd.)/ Crescent Dr.
424 US 278 at Target
425 US 278 at Burnt Church Rd./ Trimblestone Rd.
426 US 278 at Sawmill Creek Rd.
427 US 278 at Malphrus Rd./ Colleton River Dr.
428 US 278 at Buckingham Plantation Dr./ Moss Creek Dr.
551 SC 170 at Snake Rd./ Callawassie Dr.
6800 SC 170 at SC 462
556 SC 170 at Oldfield Way/ E Argent Pkwy
557 SC 170 at Argent Blvd.
559 SC 170 at Cherry Point Rd./ Pearlstine Dr.
561 SC 170 at Tidewatch Dr.
567 SC 170 at US 278 WB Off-Ramp
569 SC 170 at Sun City Blvd.
570 SC 170 at Bluffton Parkway
571 SC 170 at Mill Creek Rd./ Gibbet Rd.
619 US 21 at Midtown Dr./Wrights Point Dr.
620 US 21 at SC 128 (Savannah Hwy.)
908 US 21 at Airport Circle
911 US 21 at Polowana Rd.
912 US 21 at S-7-45
*Subject to change
Page 129 of 194
Beaufort County Trac Signal
Guidelines
54
GENERAL PROCESS
The following section outlines the general process that should be followed in Beaufort County for
new signal installations or upgrades to existing signal installations. Signals maintained by the City
of Beaufort or the Town of Hilton Head Island are not included in these specifications; those
locations should be coordinated directly with municipal signals staff.
Signals on SCDOT Roadways
Coordination with both SCDOT and Beaufort County should occur early in the design process.
Approved traffic signal warrant analysis and SCDOT traffic signal concurrence letter shall be
provided to Beaufort County staff.
Per County Council, all new traffic signals should be mast arm installations. This requirement may
be waived by the Engineering Director or his/her designee. Due to the long lead time to order mast
arm poles, installation of a temporary span wire signal may be required. This should be
coordinated with SCDOT and Beaufort County.
Beaufort County and SCDOT should be invited to the pole siting meeting to provide input on the
preliminary pole locations. Subsurface utilities shall be marked prior to the pole siting meeting.
Potential utility conflicts should be reviewed. At the pole siting meeting special considerations
such as County preference items to include based on location, timing plans to be completed,
type of detection, etc. should be discussed.
A follow-up meeting regarding any special considerations for the intersection should be scheduled
if these are not addressed at the pole siting meeting.
A left-turn phasing memo shall be prepared and submitted to Beaufort County and SCDOT based
on SCDOT Traffic Signal Guidelines. Phasing approval letter from SCDOT shall be provided.
Draft traffic signal plans shall be provided to Beaufort County and SCDOT for review and comment.
Recommended signal timing including recommended cycle and split information should be
submitted for review to Beaufort County and SCDOT.
Traffic Signal Plan Review Packages should include the following:
Draft Traffic Signal Plan
Clearance Calculations Worksheet (Consultant is responsible for clearance calculations)
Clearance Calculations Sketch (Consultant is responsible for clearance calculations)
Approved traffic signal warrant analysis
Phasing Memo for left-turn arrow considerations
Page 130 of 194
Beaufort County Trac Signal
Guidelines
55
Recommended signal timing
Any special considerations
Page 131 of 194
Beaufort County Trac Signal
Guidelines
56
Once draft traffic signal design plans are approved by SCDOT and Beaufort County, the
approved signed and sealed traffic signal plans should be provided to the Beaufort County
Signals Manager with the expected construction time frame.
Beaufort County Signals Manager should be invited to the Pre-construction meeting for the
project.
At the cost of the developer, an IMSA Level II Field inspector must inspect the installation
and provide a letter of certification for the installation to Beaufort County.
Beaufort County Signals staff (and SCDOT staff, as appropriate) should be scheduled by
the developer to be on-site for the following construction milestones. A minimum of 48
hours’ notice is required.
Pole installation
Cabinet wiring completion
Turn on
Beaufort County will not be responsible for programming of the controller or for entry of new
timing plans. Beaufort County will not be responsible for the installation of detection
systems.
SCDOT Signal installation guidelines should be followed in coordination with Beaufort
County
SCDOT Signal Activation guidelines should be followed in coordination with Beaufort
County. Current guidelines are listed below but are subject to change.
Install [type of pole], including signal head connections, but do not install signal heads until
ready to place in flashing mode.
Install controller cabinet, set up [type of detection] and complete incidental work
necessary to place signal in flashing mode.
On the day the signal is to be placed in stop and go operation, erect W3-3 “SIGNAL
AHEAD” signs with W16-14P “NEW” plaques and orange flags on all approaches. Signs
shall be placed at least [distance] feet ahead of the stop bar on the [approach]. *Note
distance for all approaches.
Place signal in flash for 5-7 days to include a weekend prior to full activation.
After two months, remove signal ahead sign assembly from all approaches.
Signals on Beaufort County Roadways
Page 132 of 194
Beaufort County Trac Signal
Guidelines
57
Traffic signal warrant analysis results shall be submitted to Beaufort County staff. Traffic
signal installation concurrence shall be provided by the Director or his/her designee.
Coordination with Beaufort County should occur early in the design process
Per County Council mandate, all new traffic signals should be mast arm installations. This
requirement may be waived by the Engineering Director or his/her designee. Due to the
long lead time to order mast arm poles, installation of a temporary span wire signal may be
required. This should be coordinated with Beaufort County.
Beaufort County should be invited to the pole siting meeting to provide input on the
preliminary pole locations. Subsurface utilities shall be marked prior to the pole siting
meeting. Potential utility conflicts should be reviewed. At the pole siting meeting special
considerations such as County preference items to include based on location, timing
plans to be completed, type of detection, etc. should be discussed.
A follow-up meeting regarding any special considerations for the intersection should be
scheduled if these are not addressed at the pole siting meeting.
A left-turn phasing memo shall be prepared and submitted to Beaufort County based on
SCDOT Traffic Signal Guidelines. Phasing approval letter from SCDOT shall be provided.
Left-turn phasing shall be discussed with Beaufort County staff.
Draft traffic signal plans shall be provided to Beaufort County staff for review and
comment. A copy of the draft traffic signal plans should be provided to SCDOT for their
courtesy review and comment.
Signal timing information including recommended cycle and split information should be
submitted for review to Beaufort County.
Traffic Signal Plan Review Packages should include the following:
Draft Traffic Signal Plan
Clearance Calculations Worksheet (Consultant is responsible for clearance calculations)
Clearance Calculations Sketch (Consultant is responsible for clearance calculations)
Approved traffic signal warrant analysis
Phasing Memo for left-turn arrow considerations
Recommended signal timing
Page 133 of 194
Beaufort County Trac Signal
Guidelines
58
Any special considerations
Once draft traffic signal design plans are approved by Beaufort County, the approved
signed and sealed traffic signal plans should be provided to the Beaufort County Signals
Manager with the expected construction time frame
Beaufort County Signals Manager should be invited to the Pre-construction meeting for the
project.
An IMSA Level II Field inspector must inspect the installation and provide a letter of
certification for the installation to Beaufort County.
Beaufort County Signals staff should be scheduled by the developer to be on-site for the
following construction milestones. A minimum of 48 hours’ notice is required.
Pole installation
Cabinet wiring completion
Turn on
Beaufort County will not be responsible for programming the controller or entry of new
timing plans. Beaufort County will not be responsible for the installation of detection
systems.
16. SCDOT Signal Activation guidelines should be followed in coordination with Beaufort
County. Current guidelines are listed below but are subject to change.
Install [type of pole], including signal head connections, but do not install signal heads until
ready to place in flashing mode.
Install controller cabinet, set up [type of detection] and complete incidental work
necessary to place signal in flashing mode.
On the day the signal is to be placed in stop and go operation, erect W3-3 “SIGNAL
AHEAD” signs with W16-14P “NEW” plaques and orange flags on all approaches. Signs
shall be placed at least [distance] feet ahead of the stop bar on the [approach]. *Note
distance for all approaches.
Place signal in flash for 5-7 days to include a weekend prior to full activation.
After two months, remove signal ahead sign assembly from all approaches.
Page 134 of 194
Beaufort County Trac Signal
Guidelines
59
REQUIREMENTS
General requirements for traffic signal installation in Beaufort County are as follows:
Materials:
All designs (including foundations) shall meet current SCDOT standards and shall be
stamped and sealed by a South Carolina registered professional engineer.
All materials, unless otherwise approved, shall be included on the SCDOT QPL.
Inspections during construction shall be provided by a third-party inspector (with a
minimum of IMSA Level II certification).
Mast Arm Details:
Vertical support shall be fluted, unless approved by Beaufort County
Horizontal mast arm shall be smooth and straight
Nut covers shall be used in lieu of decorative base
Finish shall be powder coated black
Poles shall be ordered in increments of 5-feet ranging from 25-feet to 60-feet.
Traffic signal head mountings shall be rigid via astro-brackets.
Overhead street name signs shall be installed between signal heads with standard 8”
lettering.
Note: While the attached design detail is provided by Valmont, an alternate manufacturer
may be used provided that the specifications provided within this document and detail are
met to the satisfaction of Beaufort County and SCDOT.
Design Review:
Prior to ordering of any poles, designs shall be submitted and reviewed by Beaufort County
engineering staff and SCDOT staff (as appropriate) for approval. The following items shall
Page 135 of 194
Beaufort County Trac Signal
Guidelines
60
be included in the initial permit package and contractor package submittal. Typically, the
initial permit package is completed by the design engineer, and the contractor package
submittal is prepared by the selected contractor.
Initial Permit Package:
Traffic Signal Plan signed and sealed by a South Carolina professional engineer
Approval of traffic signal plan by SCDOT or Beaufort County (as appropriate)
Supplemental Construction Package:
Foundation design details and calculations adequate for local soil types signed and sealed
by a South Carolina professional engineer. Testing requirements should be confirmed
during the pre-construction meeting
Completed SCDOT “Mast Arm Information Form”
Completed SCDOT “2001 AASHTO Design Specifications Form”
Specifications and Catalog cuts package along with equipment and warranty materials
Traffic control plan as appropriate
SCDOT Permit
SPECIAL MATERIALS
The following notes the special materials and considerations in Beaufort County.
Detection and Communications Systems must be compatible with adjacent intersections.
The type of video or radar detection used must be approved by the Beaufort County Signals
Manager.
Video Detection – Video detection can be considered for signal installation with the
approval of SCDOT. A video detection trained traffic signal contractor shall be used for all
video system installations and programming. Beaufort County is not responsible for
programming detection zones; however, the contractor shall review the detection zones
with Beaufort County signals staff and the IMSA Level II inspector during the close-out
process. See SCDOT Signal Design Specifications
Radar Detection – Radar detection can be considered for signal installation with the
approval of SCDOT. A radar detection trained traffic signal contractor shall be used for all
Page 136 of 194
Beaufort County Trac Signal
Guidelines
61
radar system installations and programming. Beaufort County is not responsible for
programming detection zones; however, the contractor shall review the detection zones
with Beaufort County signals staff and the IMSA Level II inspector during the close-out
process. See SCDOT Signal Design Specifications
Central Control Communication – Central Control Communication should be installed at
each location. The specifics should be coordinated with Beaufort County staff.
Street Lights and Luminaires – Street lighting and luminaire fixture types will be reviewed on
a case-by-case basis during the signal design review. In the event that street lighting is
required, the lighting structure shall be Holophane or equivalent as depicted in the
attached detail.
Lighting fixtures shall be specified by Beaufort County Traffic Engineering for highway
lighting or by Beaufort County or the appropriate municipality for street lighting.
Emergency Management Equipment – During the review process, Beaufort County may
specify locations for Emergency Management equipment (cameras, etc.) that shall be
specified on the plans.
MAINTENANCE
Beaufort County and SCDOT staff will review the installation of the traffic signal as
appropriate. During the pre-construction meeting, Beaufort County and SCDOT staff shall
establish the milestones during the project that need to be observed and/or approved by
Beaufort County and SCDOT staff. The contractor shall provide 48 hours’ notice of such
activities or other notification time frame established in the pre-construction meeting.
Page 137 of 194
Resolution NO. 2026/ XX
A RESOLUTION OF THE BEAUFORT COUNTY COUNCIL ADOPTING
UPDATED ROAD CONSTRUCTION AND DESIGN STANDARDS FOR ROADS
WITHIN BEAUFORT COUNTY, SOUTH CAROLINA; ESTABLISHING MINIMUM
ENGINEERING, CONSTRUCTION, INSPECTION, AND ACCEPTANCE
REQUIREMENTS; AND PROVIDING FOR IMPLEMENTATION AND
ADMINISTRATION.
WHEREAS, Beaufort County Council recognizes that safe, reliable, durable, and
properly constructed roads are essential to the health, safety, welfare, economic development,
and quality of life of the residents and visitors of Beaufort County; and
WHEREAS, the continued growth and development of Beaufort County necessitates consistent,
modern, and enforceable road construction standards to ensure that new roads and roadway improvements are
designed and constructed to appropriate engineering standards; and
WHEREAS, inconsistent road construction practices, inadequate drainage infrastructure, insufficient
pavement design, and deficiencies in roadway construction can result in premature road deterioration, increased
maintenance expenses, flooding, traffic safety concerns, and unnecessary financial burdens on County taxpayers;
and
WHEREAS, Beaufort County Council desires to establish uniform minimum standards
governing road design, construction materials, pavement thickness, roadway drainage, grading,
rights-of-way, sidewalks, shoulders, curbing, traffic control devices, and related infrastructure;
and
WHEREAS, South Carolina Code of Laws Section 57-17-10 provides for County
supervision and control of public roads under the jurisdiction of the County; and
WHEREAS, South Carolina Code of Laws Section 57-3-600 establishes requirements
that must be satisfied before a county may accept a deed to a newly constructed road or agree to
maintain such a road, including compliance with applicable construction specifications and
standards; and
WHEREAS, Beaufort County currently maintains policies and procedures governing
road acceptance, maintenance responsibilities, and roadway infrastructure, and County Council
finds that adopting updated and comprehensive construction standards will further strengthen
the County's ability to protect public infrastructure and ensure responsible use of public
resources; and
WHEREAS, the County desires to coordinate its road construction standards with
applicable South Carolina Department of Transportation (SCDOT) specifications, applicable
federal requirements, and generally accepted professional engineering practices, while
recognizing the respective jurisdictional authority of the County, SCDOT, municipalities, and
other governmental agencies; and
WHEREAS, County Council finds that the adoption of uniform road construction
standards serves the public interest by improving roadway safety, enhancing infrastructure
Page 138 of 194
Resolution NO. 2026/ XX
durability, promoting responsible development, and reducing long-term public maintenance
costs.
NOW, THEREFORE, BE IT RESOLVED BY BEAUFORT COUNTY
COUNCIL, in meeting duly assembled, adopts the Beaufort County Road Construction and
Design Standards, attached hereto as Exhibit A and incorporated herein by reference, as the
minimum standards applicable to County road construction, reconstruction, roadway
improvement projects, and the consideration of newly constructed roads for acceptance into the
County-maintained road system.
Adopted this ____ day of __________, 2026.
COUNTY COUNCIL OF BEAUFORT COUNTY
BY:
Alice Howard, Chairman
ATTEST:
_____
Sarah W. Brock, Clerk to Council
Page 139 of 194
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
APPROVAL OF A RESOLUTION TO REMOVE RILEY RD FROM THE 2018 SALES TAX PROJECT BROAD RIVER-RILEY
RD SIDEWALK.
MEETING NAME AND DATE:
Public Facilities Committee November 16, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff Recommends approval of the resolution to remove the sidewalk along Riley Road from the Broad River-
Riley Sidewalk project from the 2018 sales tax.
PRESENTER INFORMATION:
Bryan Bauer, Director of Engineering (5 min)
ITEM BACKGROUND:
In 2018, the citizens of Beaufort County voted to impose a 4-year, $120M referendum for transportation
projects. The projects are as follows: US 278 Corridor Traffic Improvements, Lady’s Island Corridor Traffic
Improvements, Sidewalks and Multi-Use Pathways. A resolution was passed by County Council updating the
sales tax priorities based on updated collections and project estimates in July 2025. A sidewalk on Broad River
Boulevard and Riley Road was included. A public meeting was held for the project on August 18, 2026, along
with a corresponding virtual meeting. Those that commented were not in favor of a sidewalk on Riley Rd. Cost
savings to remove the Riley Rd portion of the project is:
Design no change since rework for plan and stormwater
report revisions
R/W
Acquisition
$47,110.00 Removes 3 tracts from the acquisition process
Utilities $55,420.20 15% of construction
Construction $369,468.00 Based on $225/LF for 0.311 miles of sidewalk
CEI $55,420.20 15% of construction
$527,418.40
FISCAL IMPACT:
Based on not constructing this portion of the project, the net savings to the County will be $527,418.40
APPROVAL HISTORY:
Page 140 of 194
In 2018, the citizens of Beaufort County voted to impose a 4-year, $120M referendum for transportation
projects. The projects are as follows: US 278 Corridor Traffic Improvements, Lady’s Island Corridor Traffic
Improvements, Sidewalks and Multi-Use Pathways. A resolution was passed by County Council updating the
sales tax priorities based on updated collections and project estimates in July 2025.
Page 141 of 194
Resolution NO. 2026/ XX
A RESOLUTION TO REDEFINE THE PROJECT SCOPE FOR THE BROAD RIVER
BOULEVARD – RILEY ROAD SIDEWALK PROJECT FROM THE 2018
TRANSPORTATION SALES TAX PROGRAM
WHEREAS, On November 13 th 2017, by ordinance number 2017/34, Beaufort County
Council ("County Council") adopted enabling legislation authorizing the levy and collection of a
one-cent transportation sales tax; and
WHEREAS, On November 6, 2018, the citizens of Beaufort County voted to impose a 4-year,
$120M referendum for transportation projects. The projects included: US 278 Corridor Traffic Improvements,
Lady’s Island Corridor Traffic Improvements, Sidewalks and Multi-Use Pathways; and
WHEREAS, Resolution 2025/46 was passed by County Council on July 14, 2025 updating the
sales tax priorities based on updated collections and project estimates in July 2025. A sidewalk on Broad River
Boulevard and Riley Road was included; and
WHEREAS, the Broad River Blvd-Riley Road project was reprioritized as:
1) A 5-foot concrete sidewalk beginning at Broad River Elementary School and
extending along Broad River Boulevard.
2) Turns onto Riley Road and continues to the intersection with Fair Road, serving the
Shadow Moss neighborhood; and
WHEREAS, a public meeting for the Broad River Boulevard project was held on August
18, 2026 along with a corresponding virtual meeting; and
WHEREAS, due to public comments, staff now recommends the removal of the section
of sidewalk along Riley Road from the project scope.
NOW, THEREFORE, BE IT RESOLVED BY BEAUFORT COUNTY
COUNCIL, in meeting duly assembled, establishes the redefined project scope for the Broad
River Boulevard to remove the Riley Road Sidewalk project from the 2018 One Cent
Transportation Sales Tax funds.
Adopted this ____ day of __________, 2026.
COUNTY COUNCIL OF BEAUFORT COUNTY
BY:
Alice Howard, Chairman
ATTEST:
_____
Sarah W. Brock, Clerk to Council
Page 142 of 194
Beaufort County conducted an in-person Public Meeting on August 18, 2026, in conjunction with a Virtual Public Meeting
from August 4, 2026, through September 2, 2026, for the proposed Broad River Boulevard and Riley Road Sidewalk project.
The following is a summary of the project with exhibits shown at the public meeting and published on the website.
The project is a proposed 6′ sidewalk on Broad River Boulevard from Broad River Elementary School to Riley Road and on
Riley Road from Broad River Boulevard to Fair Road. This sidewalk is approximately 0.7 5 miles long and will improve
pedestrian safety by providing a separate facility from the roadway.
Broad River Boulevard is a SCDOT-owned and maintained roadway with a variable present right of way and Riley Road is a
County-owned and maintained roadway with a variable present right of way. It is anticipated the sidewalk will remain within
the present right of way where possible, but new right of way will be required.
Meeting Summary:
Time Period:
• Public Meeting: August 18, 2026, from 5-7 pm at the Broad River Elementary School, 474 Broad River Boulevard,
SC – An informal, drop-in format meeting hosted by Beaufort County Engineering along with representatives from
J. Bragg Consulting, Inc. and Infrastructure Consulting and Engineering, Inc. Citizens were provided an opportunity
to review the exhibits and have a one -on-one question/answer session with project representatives. There were
12 attendees.
• Virtual Public Meeting: August 4 , 2026, through September 2 , 2026 – 30-day virtual meeting hosted on
www.BeaufortCountyPenny.com
Advertisements:
• E-mail advertisement on August 13, 2026, and County Administrator Weekly Update on August 15, 2026
• 7 “Yard” Signs total were placed on August 6, 2026
• County Public Meetings Calendar: https://www.beaufortcountysc.gov/calendar.html
Public Comments:
13 total comments were received by submitting the comment form during the public meeting or by an online comment
form, mail, e-mail, and hand delivery. Comments with a valid mailing address will receive a mailed response. The following
is a summary of comments received:
• 10 comments were submitted at the Public Meeting.
• 3 comments were submitted through the online comment form
On the Comment Form, they were asked if they were “In Favor Of” the project by answering “Yes” or “No”, if they lived
near the proposed project “Yes” or “No”, and if they would utilize the proposed sidewalk “Yes or “No.” This is a summary
of those who responded to the questions:
BROAD RIVER BLVD & RILEY RD SIDEWALK
SUMMARY & RECOMMENDATION
Page 143 of 194
Page 2
Sidewalk
“In Favor Of” “Lives Near” “Would Utilize”
Yes No Yes No Yes No
6’ Broad River Boulevard & Riley Road Sidewalk 4 8 12 1 4 8
The above chart represent s 12 commentor’s responses which were submitted. 1 commentor did not answer the above
questions and another commentor only provided a response to “lives near”. They were also provided with the opportunity
to submit a written comment. 13 commentors provided a written comment.
Several commentors may have been in favor of the project if it did not include a sidewalk on Riley Road. The residents of
Riley Road are not in favor of constructing the sidewalk on Riley Road.
Recommendation:
Based on the comments received from the meeting, it is recommended that the County proceed with the following:
• Construction of a new 6’ sidewalk only on Broad River Boulevard from Broad River Boulevard Elementary School
to Riley Road
• Remove the sidewalk on Riley Road from the project and do not construct
Comment Summary:
Note: Comments are copied as is with no edits.
I own land located at 29 Riley Rd (2 lots). My son and family has a house and reside on the property at 29 Riley Rd. If
the project starts, 29 Riley Rd would need an established driveway placed on lot 34, where the current mail box for 29
Riley Rd exist.
Yes we would use it on broad river blvd. We would not on Riley rd. We don't believe it's needed on Riley rd. The
setback on Riley rd and removal of trees etc to complete the project is unfair to the people on that road. It would be
better to extend the walkway the other direction to castle rock. wife most days picks up the trash on broad river blvd
from Joe Fraser to Donaldson camp rd. The side walk on broad river to Joe Frazier is to close to the road. At least from
Riley rd to castle rock rd. It would be better for everyone. Please leave Riley rd alone.
We believe the sidewalk should extend to the intersection of Broad River Blvd & Castle Rock Rd.
This is a ridiculous waste of taxpayers money. Nobody walks down this road. All kids that are dropped off by the school
bus are picked up by their parents.
There is never anyone walking on Riley or Fair Road. It makes no sense to add a sidewalk that doesn't get use. It will be
a waste of money to put it in. There also isn't a drainage problem even though that was said as well.
I have lived @ my address for 34 years. 1. The road, Riley Rd, is too dangerous for pedestrians. 2. We built a fence to
protect our family from careless drivers. 3. Can we monitor Riley Rd to evaluate how many people walk down our
road? If you notice anyone, please let us know. 4. In a nutshell. This is a waste of money! If it would help the
neighborhood, then I we be all for it. It simply defies logic! Waste of taxpayers money.
We see no use for it. No one walks on Riley Rd. We have not seen drainage problems. A few kids meet bus at Broad
River. We need speed bumps for drivers. We suggest using money in front of school for turn lane. We take care of our
yard & keep it where someone could walk in grass. We need speed bumps not a sidewalk.
Page 144 of 194
Page 3
I am in favor of a more walkable Beaufort County.
I'm not sure how to feel about it. I really don't approve of the sidewalk. It's not serving me any purpose and you are
taking property away from us to benefit someone else. It is not right.
Bringing in a sidewalk is not good. I strongly go against it. My drainfield is near my mailbox. My land is too low. My
fence is not to be removed, you will cause property damage, you will cause septic and drainfield damage. You will
cause hardship to my family. We lived there over 60 years now. You want to take away our land and heritage. the oak
tree is a part of our family and value and cannot be removed. Wd don't need your sidewalk. Go away!!
Why Riley Road? Better Castle Road Rd to Riley Rd. Considered Castle Rock to 170. There is a big soccer field on Castle
Rock and Colonial Heights has a lot of school age children.
Continually adding impervious surfaces exacerbates an ongoing stormwater problem. If there has been a strong need
for this sidewalk because of public safety and citizens requests for this sidewalk, please consider using pervious
materials. Cost and maintenance would most likely outweigh the negative impacts of overstressing an already
problematic stormwater issue, considering the amount of growth that is possible in this area.
I feel the Broad River Boulevard & Riley Road Sidewalk project represents a questionable use of the limited
transportation tax dollars. It dedicates over a million to constructing a sidewalk serving a relatively small residential
area. While pedestrian safety is an important objective, we should focus on whether this project provides sufficient
public benefit compared to other transportation needs such as reducing traffic congestion, improving major
intersections, repairing deteriorating roads, or addressing countywide infrastructure deficiencies. The project's
estimated cost has increased from approximately $1.19 million to $1.49 million, an increase of more than 25%, before
construction has even begun, and years after if was approved in the 2018 sales tax referendum. These delays and cost
increases raise questions about whether we are maximizing the value of available funds, for many residents who will
never use this sidewalk. The return on investment appears limited when compared with projects that would benefit
tens of thousands of daily drivers or address more pressing transportation challenges.
Page 145 of 194
BEAUFORT COUNTY
PUBLIC FACILITIES COMMITTEE
AGENDA ITEM SUMMARY
ITEM TITLE:
APPROVAL OF A CONTRACT TO PHILLIPS PAVING COMPANY FOR THE STUART POINT PATHWAY PROJECT
($1,978,701.50) - CONTINGENT UPON FINAL SC. DEPT OF COMMERCE APPROVAL
MEETING NAME AND DATE:
Public Facilities Committee November 16, 2026
STAFF RECOMMENDATION / COUNCIL OPTIONS:
Staff recommends approval to allocate a total project budget of $1,978,701.50 including contingency amount.
(Pending SC Dept. of Commerce Approval)
PRESENTER INFORMATION:
Bryan Bauer, PE - Director of Engineering (5 min)
ITEM BACKGROUND:
This project is part of the 2018 Sales Tax Program and is governed by an intergovernmental agreement
between SCDOT and Beaufort County.
This project has been approved by the US Department of Commerce for receipt of a $200,000 Community
Development Block Grant, to be applied to a portion of the total project costs. The award, and therefore
commencement of construction of the project as bid, is subject to full final approval by the Commerce
Department, contingent upon finding of an acceptable bid amount and bid process.
On September 16, 2026, Beaufort County published an invitation to bid for the project scope. Four bids were
received by the deadline of October 22, 2026, and determined to be fair and reasonable, and within expected
project cost estimates.
We are seeking PFC and County Counsel approvals at this time, with a final required approval to be issued by
the US Department of Commerce for the community block grant.
FISCAL IMPACT:
• Contract fee for materials and construction: $1,798,819.50
• Recommended contingency (10%): $179,882.00
• Total expected project budget: $1,978,701.50
• Funding source: Account No. 4705-80-0000-54500
• Balance of funding account: $17,170,887.18
• Community Block Grant funds: $200,000.00
APPROVAL HISTORY:
Page 146 of 194
Counsel approved design and plan preparation work in 2024.
Page 147 of 194
Beaufort County, SC
Engineering
Bryan Bauer, Director
PO Box 1228, Beaufort, SC 29902
EVALUATION TABULATION
IFB No. IFB 102226
S-70 Stuart Point Road Sidewalk
RESPONSE DEADLINE: October 22, 2026 at 3:00 pm
Report Generated: Friday, October 30, 2026
SELECTED VENDOR TOTALS
Vendor Total
Phillips Paving Co. $1,798,819.25
KTC Enterprises $2,477,923.64
Site-Prep Inc of NC $2,890,563.64
APAC Atlantic, Inc. $3,390,840.86
S-70 STUART POINT ROAD SIDEWALK BID SHEET
S-70 Stuart Point Road Sidewalk Bid Sheet APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC
Selected Line Item Description Quantity Unit of
Measure
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
X 1031000 MOBILIZATION 1 LS $195,000.00 $195,000.00 $142,000.00 $142,000.00 $229,790.00 $229,790.00 $148,100.00 $148,100.00
X 1032010 BONDS AND
INSURANCE
1 LS $60,000.00 $60,000.00 $72,020.05 $72,020.05 $25,300.00 $25,300.00 $55,000.00 $55,000.00
X 1050800 CONSTRUCTION
STAKES, LINES &
GRADES
1 EA $60,000.00 $60,000.00 $99,000.00 $99,000.00 $19,250.00 $19,250.00 $15,640.00 $15,640.00
X 2012000 CLEARING &
GRUBBING
WITHIN
ROADWAY
1 LS $400,000.00 $400,000.00 $92,000.00 $92,000.00 $50,000.00 $50,000.00 $193,500.00 $193,500.00
Page 148 of 194
EVALUATION TABULATION
IFB No. IFB 102226
S-70 Stuart Point Road Sidewalk
EVALUATION TABULATION
Invitation For Bid - S-70 Stuart Point Road Sidewalk
Page 2
S-70 Stuart Point Road Sidewalk Bid Sheet APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC
Selected Line Item Description Quantity Unit of
Measure
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
X 2025000 REMOVAL &
DISPOSAL OF
EXISTING
ASPHALT
PAVEMENT
50 SY $125.00 $6,250.00 $50.00 $2,500.00 $90.00 $4,500.00 $37.00 $1,850.00
X 2031000 UNCLASSIFIED
EXCAVATION
4930 CY $53.00 $261,290.00 $28.00 $138,040.00 $17.75 $87,507.50 $51.83 $255,521.90
X 2033000 BORROW
EXCAVATION
7932 CY $63.00 $499,716.00 $35.26 $279,682.32 $28.00 $222,096.00 $50.09 $397,313.88
X 2034000 MUCK
EXCAVATION
500 CY $94.00 $47,000.00 $27.00 $13,500.00 $39.50 $19,750.00 $80.92 $40,460.00
X 3050106 GRADED
AGGREGATE
BASE COURSE
(6" UNIFORM)
55 SY $205.00 $11,275.00 $90.00 $4,950.00 $42.00 $2,310.00 $84.05 $4,622.75
X 3050108 GRADED
AGGREGATE
BASE COURSE
(8" UNIFORM)
420 SY $140.00 $58,800.00 $45.25 $19,005.00 $46.00 $19,320.00 $71.87 $30,185.40
X 3059900 MAINTENANCE
STONE
338 TON $200.00 $67,600.00 $75.00 $25,350.00 $75.00 $25,350.00 $112.00 $37,856.00
X 4011004 LIQUID ASPHALT
BINDER PG64-22
20 TON $700.00 $14,000.00 $767.00 $15,340.00 $895.80 $17,916.00 $887.64 $17,752.80
X 4040340 ASPHALT
SURFACE
COURSE TYPE C
44 TON $375.00 $16,500.00 $361.11 $15,888.84 $225.50 $9,922.00 $223.45 $9,831.80
Page 149 of 194
EVALUATION TABULATION
IFB No. IFB 102226
S-70 Stuart Point Road Sidewalk
EVALUATION TABULATION
Invitation For Bid - S-70 Stuart Point Road Sidewalk
Page 3
S-70 Stuart Point Road Sidewalk Bid Sheet APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC
Selected Line Item Description Quantity Unit of
Measure
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
X 4040350 ASPHALT
SURFACE
COURSE TYPE D
288 TON $355.00 $102,240.00 $361.11 $103,999.68 $165.00 $47,520.00 $163.50 $47,088.00
X 6011000 TRAFFIC
CONTROL
1 LS $400,000.00 $400,000.00 $235,000.00 $235,000.00 $71,125.00 $71,125.00 $223,415.00 $223,415.00
X 6051120 PERMANENT
CONSTRUCTION
SIGNS (GROUND
MOUNTED)
288 SF $15.00 $4,320.00 $32.10 $9,244.80 $16.00 $4,608.00 $6.60 $1,900.80
X 6271015 8" WHITE SOLID
LINES
THERMOPLASTIC
- 125 MIL.
704 LF $2.80 $1,971.20 $9.60 $6,758.40 $5.00 $3,520.00 $10.90 $7,673.60
X 6271025 24" WHITE
SOLID LINES
(STOP/DIAG
LINES)-
THERMO.-125
MIL
140 LF $12.75 $1,785.00 $14.00 $1,960.00 $20.00 $2,800.00 $10.90 $1,526.00
X 7143615 15" SMOOTH
WALL PIPE
984 LF $110.00 $108,240.00 $142.00 $139,728.00 $68.65 $67,551.60 $186.30 $183,319.20
X 7143618 18" SMOOTH
WALL PIPE
608 LF $115.00 $69,920.00 $152.00 $92,416.00 $82.30 $50,038.40 $198.25 $120,536.00
X 7149999 CLEANING
EXISTING PIPE
310 LF $25.00 $7,750.00 $60.00 $18,600.00 $25.00 $7,750.00 $27.25 $8,447.50
X 7192010 DROP INLET (24"
X 24")
15 EA $6,250.00 $93,750.00 $4,400.00 $66,000.00 $6,292.00 $94,380.00 $5,380.00 $80,700.00
Page 150 of 194
EVALUATION TABULATION
IFB No. IFB 102226
S-70 Stuart Point Road Sidewalk
EVALUATION TABULATION
Invitation For Bid - S-70 Stuart Point Road Sidewalk
Page 4
S-70 Stuart Point Road Sidewalk Bid Sheet APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC
Selected Line Item Description Quantity Unit of
Measure
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
X 7197052 CONCRETE
COLLAR FOR UP
TO 24" PIPE
3 EA $5,000.00 $15,000.00 $5,400.00 $16,200.00 $4,155.00 $12,465.00 $3,785.00 $11,355.00
X 7204100 CONCRETE
SIDEWALK(4"
UNIFORM)
8429 SY $77.00 $649,033.00 $70.95 $598,037.55 $54.00 $455,166.00 $89.40 $753,552.60
X 7204900 DETECTABLE
WARNING
MATERIAL
492 SF $51.00 $25,092.00 $85.00 $41,820.00 $40.00 $19,680.00 $54.50 $26,814.00
X 7209000 PEDESTRIAN
RAMP
CONSTRUCTION
353 SY $126.00 $44,478.00 $12.80 $4,518.40 $115.00 $40,595.00 $119.36 $42,134.08
X 8041020 RIP-RAP (CLASS
B)
24 TON $385.00 $9,240.00 $375.00 $9,000.00 $100.00 $2,400.00 $178.00 $4,272.00
X 8048205 GEOTEXTILE FOR
EROSION
CONTROL
UNDER
RIPRAP(CLASS
2)TYPE B
33 SY $32.00 $1,056.00 $15.00 $495.00 $8.00 $264.00 $30.00 $990.00
X 8068301 TEMPORARY
BARRIER FENCE
(ORANGE)
1481 LF $3.40 $5,035.40 $9.00 $13,329.00 $2.25 $3,332.25 $2.62 $3,880.22
X 8071000 RESET FENCE 323 LF $35.50 $11,466.50 $37.00 $11,951.00 $15.00 $4,845.00 $51.16 $16,524.68
X 8072000 RESET CHAIN-
LINK FENCE
1381 LF $30.00 $41,430.00 $34.00 $46,954.00 $31.00 $42,811.00 $43.60 $60,211.60
Page 151 of 194
EVALUATION TABULATION
IFB No. IFB 102226
S-70 Stuart Point Road Sidewalk
EVALUATION TABULATION
Invitation For Bid - S-70 Stuart Point Road Sidewalk
Page 5
S-70 Stuart Point Road Sidewalk Bid Sheet APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC
Selected Line Item Description Quantity Unit of
Measure
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
X 8091010 RIGHT OF WAY
MARKER(REBAR
AND CAP)
89 EA $250.00 $22,250.00 $200.00 $17,800.00 $275.00 $24,475.00 $60.00 $5,340.00
X 8091050 RIGHT OF WAY
PLAT
1 LS $10,000.00 $10,000.00 $8,500.00 $8,500.00 $25,000.00 $25,000.00 $5,175.00 $5,175.00
X 8100100 PERMANENT
COVER
3.59 ACRE $1,416.00 $5,083.44 $1,000.00 $3,590.00 $2,035.00 $7,305.65 $1,543.00 $5,539.37
X 8100200 TEMPORARY
COVER
3.59 ACRE $933.00 $3,349.47 $1,000.00 $3,590.00 $1,375.00 $4,936.25 $1,016.00 $3,647.44
X 8104005 FERTILIZER
(NITROGEN)
359 LB $1.26 $452.34 $0.12 $43.08 $2.50 $897.50 $1.37 $491.83
X 8104010 FERTILIZER
(PHOSPHORIC
ACID)
359 LB $1.26 $452.34 $0.12 $43.08 $2.50 $897.50 $1.37 $491.83
X 8104015 FERTILIZER
(POTASH)
359 LB $1.26 $452.34 $0.12 $43.08 $2.50 $897.50 $1.37 $491.83
X 8105005 AGRICULTURAL
GRANULAR LIME
7183 LB $1.15 $8,260.45 $0.20 $1,436.60 $1.00 $7,183.00 $1.25 $8,978.75
X 8109050 SELECTIVE
WATERING
54300 GAL $0.01 $543.00 $0.32 $17,376.00 $0.10 $5,430.00 $0.14 $7,602.00
X 8109901 MOWING 14.37 ACRE $452.00 $6,495.24 $308.00 $4,425.96 $550.00 $7,903.50 $493.00 $7,084.41
X 8151203 HYDRAULIC
EROSION
CONTROL
PRODUCT
(HECP) - TYPE 3
1.59 ACRE $2,995.00 $4,762.05 $2,200.00 $3,498.00 $4,180.00 $6,646.20 $3,265.00 $5,191.35
Page 152 of 194
EVALUATION TABULATION
IFB No. IFB 102226
S-70 Stuart Point Road Sidewalk
EVALUATION TABULATION
Invitation For Bid - S-70 Stuart Point Road Sidewalk
Page 6
S-70 Stuart Point Road Sidewalk Bid Sheet APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC
Selected Line Item Description Quantity Unit of
Measure
Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total
X 8152007 SEDIMENT
TUBES FOR
DITCH CHECKS
1300 LF $11.26 $14,638.00 $35.00 $45,500.00 $14.30 $18,590.00 $12.27 $15,951.00
X 8153000 SILT FENCE 4133 LF $4.50 $18,598.50 $7.05 $29,137.65 $3.00 $12,399.00 $3.82 $15,788.06
X 8153090 REPLACE/REPAIR
SILT FENCE
413 LF $3.78 $1,561.14 $7.05 $2,911.65 $4.25 $1,755.25 $4.12 $1,701.56
X 8154050 REMOVAL OF
SILT RETAINED
BY SILT FENCE
1033 LF $1.65 $1,704.45 $3.50 $3,615.50 $4.55 $4,700.15 $1.80 $1,859.40
X 8156210 INLET
STRUCTURE
FILTER - TYPE B
15 EA $200.00 $3,000.00 $75.00 $1,125.00 $396.00 $5,940.00 $217.00 $3,255.00
Total $3,390,840.86 $2,477,923.64 $1,798,819.25 $2,890,563.64
VENDOR QUESTIONNAIRE PASS/FAIL
Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC
Certification Pass Pass Pass Pass
Contact information of
authorized representative?
Pass Pass Pass Pass
Please Provide Licenses and
Certificate of Insurance
Pass Pass Pass Pass
100% Labor and Material
Payment Bond
Pass Pass Pass Pass
Bidder Confirmation Pass Pass Pass Pass
Communications Pass Pass Pass Pass
Page 153 of 194
EVALUATION TABULATION
IFB No. IFB 102226
S-70 Stuart Point Road Sidewalk
EVALUATION TABULATION
Invitation For Bid - S-70 Stuart Point Road Sidewalk
Page 7
Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC
Are you submitting this bid as
a local vendor?
Pass Pass Pass Pass
Local Vendor Preference -
Participation Affidavit
No Response No Response No Response No Response
Non-Collusion Affidavit of
Prime Bidder
Pass Pass Pass Pass
Will you be using
subcontractors?
Pass Pass Pass Pass
Non-Collusion Affidavit of
Subcontractor
Pass No Response No Response Pass
Certification By Contractor
Regarding Non-Segregated
Facilities
Pass Pass Pass Pass
Business Organization
Type of Business Organization: Pass Pass Pass Pass
If you selected "Other" for
your type of business, please
explain:
Pass Pass Pass Pass
If applicable, please provide
name of partners and
additional information below:
Pass Pass Pass Pass
If your agency is a
Corporation:
Pass Pass Pass Pass
Are you a Subchapter S
Corporation?
Pass Pass Pass Pass
Please provide Subchapter S
Shareholders:
No Response Pass Pass Pass
Page 154 of 194
EVALUATION TABULATION
IFB No. IFB 102226
S-70 Stuart Point Road Sidewalk
EVALUATION TABULATION
Invitation For Bid - S-70 Stuart Point Road Sidewalk
Page 8
Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC
If individually owned: Pass Pass Pass Pass
Have you ever operated under
another name?
Pass Pass Pass Pass
Please provide all other
business names and addresses
of principal place of business
for each business:
Pass No Response No Response No Response
Bonding
Bid Bond Pass Pass Pass Pass
Please provide the Bonding
information:
Pass Pass Pass Pass
Do you intend to use any
alternative form of security
Pass Pass Pass Pass
Indicate the form of security
you intend to use and the
name, address, point of
contact, and telephone
number of the banks, savings
and loan, or surety you intend
to use. (NOTE: Prequalification
will not assure acceptance of
any form of security.)
No Response No Response No Response No Response
Have any Performance or
Payment Bond claims ever
been paid by any surety on
behalf of your organization?
Pass Pass Pass Pass
Page 155 of 194
EVALUATION TABULATION
IFB No. IFB 102226
S-70 Stuart Point Road Sidewalk
EVALUATION TABULATION
Invitation For Bid - S-70 Stuart Point Road Sidewalk
Page 9
Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC
State the name of the
project(s); the date; the name,
address, telephone number,
and contact person for the
claimant; the surety satisfying
the claim; the size of the
claim; and the circumstances
giving rise to the claim.
No Response No Response No Response No Response
Have you ever arbitrated or
litigated a claim with an
Owner, Architect, or Engineer
in the last five years?
Pass Pass Pass Pass
State the name of the
project(s); the date; the name,
address, telephone number,
and contact person for the
claimant; the surety satisfying
the claim; the size of the
claim; and the circumstances
giving rise to the claim.
(Provide attachments if
necessary.)
No Response No Response No Response No Response
Have you or any officer,
partner, or owner of your
organization, in any state or
territory of the United States,
or with respect to any agency
of the Federal government:
Page 156 of 194
EVALUATION TABULATION
IFB No. IFB 102226
S-70 Stuart Point Road Sidewalk
EVALUATION TABULATION
Invitation For Bid - S-70 Stuart Point Road Sidewalk
Page 10
Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC
In the last in the last five
years, received any fines or
citations for building code
violations which were
unrelated to design?
Pass Pass Pass Pass
Provide the name, address,
telephone number, contact
person, and circumstances
relating to the question.
No Response No Response No Response No Response
Ever been found to be guilty
of charges relating to conflicts
of interest:
Pass Pass Pass Pass
Provide the name, address,
telephone number, contact
person, and circumstances
relating to the question.
No Response No Response No Response No Response
Ever been convicted on
charges related to any
criminal activity relating to
construction means, methods,
or techniques; bidding or bid
rigging; or bribery?
Pass Pass Pass Pass
Provide the name, address,
telephone number, contact
person, and circumstances
relating to the question.
No Response No Response No Response No Response
In the last five years, been
found guilty of any minority
contracting law violations?
Pass Pass Pass Pass
Page 157 of 194
EVALUATION TABULATION
IFB No. IFB 102226
S-70 Stuart Point Road Sidewalk
EVALUATION TABULATION
Invitation For Bid - S-70 Stuart Point Road Sidewalk
Page 11
Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC
Provide the name, address,
telephone number, contact
person, and circumstances
relating to the question.
No Response No Response No Response No Response
In the last five years, pleaded
no contest in any criminal
proceeding related to
contracting?
Pass Pass Pass Pass
Provide the name, address,
telephone number, contact
person, and circumstances
relating to the question.
No Response No Response No Response No Response
Ever been disbarred from
doing Federal, state, or local
government work for any
reason?
Pass Pass Pass Pass
Provide the name, address,
telephone number, contact
person, and circumstances
relating to the question.
No Response No Response No Response No Response
Ever been terminated on a
contract due to your default?
Pass Pass Pass Pass
Provide the name, address,
telephone number, contact
person, and circumstances
relating to the question.
No Response No Response No Response No Response
In the last five years, paid
liquidated damages for being
late on a project?
Pass Pass Pass Pass
Page 158 of 194
EVALUATION TABULATION
IFB No. IFB 102226
S-70 Stuart Point Road Sidewalk
EVALUATION TABULATION
Invitation For Bid - S-70 Stuart Point Road Sidewalk
Page 12
Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC
Provide the name, address,
telephone number, contact
person, and circumstances
relating to the question.
No Response No Response No Response No Response
In the last five years, been
subject to tax collection
proceedings?
Pass Pass Pass Pass
Provide the name, address,
telephone number, contact
person, and circumstances
relating to the question.
No Response No Response No Response No Response
In the last seven years, filed
for bankruptcy?
Pass Pass Pass Pass
Provide the name, address,
telephone number, contact
person, and circumstances
relating to the question.
No Response No Response No Response No Response
Under what chapter of
bankruptcy did you file?
No Response No Response No Response No Response
If you filed under Chapter 11
Reorganization, how long did
you operate under this status?
No Response No Response No Response No Response
Are you operating under
Chapter 11 status now?
No Response No Response No Response No Response
Safety
Page 159 of 194
EVALUATION TABULATION
IFB No. IFB 102226
S-70 Stuart Point Road Sidewalk
EVALUATION TABULATION
Invitation For Bid - S-70 Stuart Point Road Sidewalk
Page 13
Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC
Have you, in the last three
years, been cited for willful
violations for failure to abate,
or for repeated violations, by
the United States
Occupational Safety and
Health Administration or by
the South Carolina
Occupational Safety and
Health Administration or by
any other governmental
body?
Pass Pass Pass Pass
State date, name, address,
telephone number, and
contact person for agency
issuing citation and the nature
of the violation. Also, advise
the amount of fines paid, if
any. Provide attachments if
necessary.
No Response No Response No Response No Response
List your worker’s
compensation experience
modifier for the last three
years.
No Response No Response No Response No Response
References
Page 160 of 194
EVALUATION TABULATION
IFB No. IFB 102226
S-70 Stuart Point Road Sidewalk
EVALUATION TABULATION
Invitation For Bid - S-70 Stuart Point Road Sidewalk
Page 14
Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC
Provide at least two
references from each industry
group listed. Provide other
references as requested.
Provide current names,
addresses, telephone
numbers, and contacts.
Pass Pass Pass Pass
Certification regarding
Debarment, Suspension,
Ineligibility, and Voluntary
Exclusion:
The contractor certifies: Pass Pass Pass Pass
Explain fully if it has been
involved in any litigation
involving performance.
No Response Pass No Response No Response
Small and Minority Business
Participation Program
Are you a Small or Minority
Business ?
Pass Pass Pass Pass
Upload your Small/Minority
Documentation
No Response Pass No Response No Response
Are you self-performing
100%?
Pass Pass Pass Pass