RecordWell Data

Public Facilities Committee — Agenda Packet

Beaufort County · Beaufort County · Public Facilities Committee · meeting of Nov 16, 2026 · Agenda packets

Open the original document More from Beaufort County

This document is no longer listed on Beaufort County's website. We kept the copy we read.

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Public Facilities Committee Meeting Beaufort County, SC Council Chambers, Administration Building Beaufort County Government Robert Smalls Complex 100 Ribaut Road, Beaufort Monday, November 16, 2026 4:00 PM AGENDA COMMITTEE MEMBERS: Logan Cunningham, Chair Anna Maria Tabernik Thomas Reitz David P. Bartholomew, Vice-Chairman Mark Lawson Alice Howard, Ex-Officio 1. CALL TO ORDER: 2. PLEDGE OF ALLEGIANCE: 3. STATEMENT OF COMPLIANCE WITH FOIA: 4. APPROVAL OF AGENDA 5. APPROVAL OF MINUTES ● Minutes from October 19, 2026 6. PUBLIC COMMENT PERIOD – 15 MINUTES TOTAL 7. ASSISTANT COUNTY ADMINISTRATOR REPORT 8. AGENDA ITEMS a. Informational Item: Airport Capital Improvement Program (ACIP) List for Hilton Head Island Airport (HXD) and Beaufort Executive Airport (ARW). (FISCAL IMPACT: N/A) - Jon Rembold, A.A.E., Airports Director (3 min.) b. A Resolution to accept a South Carolina Aeronautics Commission (SCAC) Entitlement Grant for the Hilton Head Island Airport (HXD) Leakage and Retention Study — Contingent upon final grant offer. (FISCAL IMPACT: The proposed total study cost is $11,000, with funding requested as follows: SCAC Entitlement Grant: $11,000 Local match: $0 Funding Source: GL 5402-90-0000-57130 Available balance: $6,894,212.83 CONTINGENT UPON FINAL GRANT OFFER) - Jon Rembold, A.A.E., Airports Director (3 min.) c. A Resolution to Accept a South Carolina Aeronautics Commission (SCAC) Entitlement Grant for the Hilton Head Island Airport (HXD) Terminal Parking Gate Electrical and Data Infrastructure Page 1 of 194 Project — Contingent upon the final grant offer. (FISCAL IMPACT: The total project cost is estimated at $35,905.00, with funding allocated as follows: SCAC Entitlement Grant: $35,905.00 Local match: $0 Funding Source: GL 5402-90-0000-57130 Balance: $6,894,212.83 CONTINGENT UPON FINAL GRANT OFFER) - Jon Rembold, A.A.E., Airports Director (3 min.) d. A Resolution to accept a South Carolina Aeronautics Commission (SCAC) Entitlement Grant for the Hilton Head Island Airport (HXD) Pedestrian and Walkway Bridge Project — Contingent upon final grant offer. (FISCAL IMPACT: The $125,000 grant to offset the project cost will be allocated as follows: SCAC Entitlement Grant: $125,000 Local match: $0 Funding Source: GL 5402-90-0000-57130 Balance: $6,894,212.83 CONTINGENT UPON FINAL GRANT OFFER) - Jon Rembold, A.A.E., Airports Director (3 min.) e. An Ordinance Authorizing the Acceptance of Robin Way into County Road Inventory (FISCAL IMPACT: Future impacts could cost below: • Estimated potential cost for 20-year life cycle for resurfacing/maintenance ≈ $1.7 million (C-Funds account # 2343-30-0000-54500)) - Bryan Bauer, Director of Engineering Kelsie Floyd, Right of Way Manager (10 min) f. An Ordinance Authorizing the County Administrator to Execute the Necessary Documents and Provide Funding for the Purchase of the 302 Parker Drive for Public Works and Other County Operations (FISCAL IMPACT: The purchase price is $X,XXX,XXX, in addition to closing costs. The funding source is the 2025 GO Bonds Fund (Fund 4013), specifically for Renovations to Buildings - 4013-80-1301- 54420, which has an account balance of $25,000,000. ) - Jared Fralix, Assistant County Administrator, 10 minutes g. A resolution adopting Beaufort County Road Construction Standards and Specifications (FISCAL IMPACT: There is no fiscal impact to the County at this time.) - Bryan Bauer, PE, Director (5 minutes) h. Approval of a Resolution to Remove Riley Rd from the 2018 Sales Tax project Broad River-Riley Rd Sidewalk. (FISCAL IMPACT: Based on not constructing this portion of the project, the net savings to the County will be $527,418.40) - Bryan Bauer, Director of Engineering (5 min) i. Approval of a contract to Phillips Paving Company for the Stuart Point Pathway Project ($1,978,701.50) - Contingent upon final SC. Dept of Commerce approval (FISCAL IMPACT: • Contract fee for materials and construction: $1,798,819.50 • Recommended contingency (10%): $179,882.00 • Total expected project budget: $1,978,701.50 • Funding source: Account No. 4705-80-0000-54500 • Balance of funding account: $17,170,887.18 • Community Block Grant funds: $200,000.00 ) - Bryan Bauer, PE - Director of Engineering (5 min) j. Approval of Contract to J. Bragg Consultants Inc for the 2018 One-Cent Sales Tax Program Management ($1,445,481.27) (FISCAL IMPACT: Fee for program management services is Page 2 of 194 $1,314,073.88. Staff recommends a 10% contingency of $131,407.39 for a total budget request of $1,445,481.27. This total will be funded out of Sales Tax account 4705-80-0000- 54500-PGMNT with a budget of $3,000,000.) - Bryan Bauer, PE — Director of Engineering & Jared Fralix, PE — Assistant County Administrator Infrastructure (5 min) k. Approval of a contract to APAC Atlantic, LLC for Asphalt Resurfacing at Bluffton & St. Helena Convenience Centers ($411,200.57) (FISCAL IMPACT: • Contract fee for materials and construction: $373,818.70 • Recommended contingency (10%): $37,818.70 • Total expected project budget: $411,200.57 • Funding source: Account No. 4013-80-1340-54500 (240S02) • Balance of funding account: $836,222.00 ) - Bradley Harriott, 5 min 9. ADJOURNMENT To watch committee or County Council meetings or for a complete list of agendas and backup packages, please visit: https://beaufortcountysc.gov/council/council-committee-meetings/index.html Page 3 of 194 Public Facilities Committee Meeting Beaufort County, SC Council Chambers, Administration Building Beaufort County Government Robert Smalls Complex 100 Ribaut Road, Beaufort Monday, October 19, 2026 4:00 PM MINUTES Watch the video stream available on the County's website to hear the Council’s discussion of a specific topic or the complete meeting https://beaufortcountysc.new.swagit.com/videos/404301 1. Call to Order Committee Chair Cunningham called the meeting to order at 4:23 PM Present Committee Chair Logan Cunningham Committee Vice-Chair David Bartholomew - @ 4:32 PM Committee Member Mark Lawson Committee Member Thomas Reitz - Virtual Ex-Officio Alice Howard Committee Member Anna Maria Tabernik Council Member Paula Brown Council Gerald Dawson Council Member York Glover Council Member Joseph Passiment Absent Council Member Lawrence McElynn 2. Pledge of Allegiance Committee Chair Cunningham led the Pledge of Allegiance. 3. Statement of Compliance with FOIA Committee Chair Cunningham stated that public notification of this meeting had been published, posted, and distributed in compliance with SC FOIA. 4. Approval of Agenda Motion: It was moved by Council Member Dawson, seconded by Committee Member Lawson to approve the agenda. The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Member Lawson, Committee Member Reitz, Ex-Officio Howard, Committee Member Tabernik, Council Member Brown, Council Member Dawson, Council Member Glover, and Council Member Passiment. The motion passed 9:0. Page 4 of 194 5. Approval of Minutes Motion: It was moved by Committee Member Lawson, seconded by Committee Member Tabernik to approve the minutes from August 17, 2026, and September 21, 2026. The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Member Lawson, Committee Member Reitz, Ex-Officio Howard, Committee Member Tabernik, Council Member Brown, Council Member Dawson, Council Member Glover, and Council Member Passiment. The motion passed 9:0. 6. Public Comment Period No public comments were taken. 7. Assistant County Administrator Report a. Event Communication: Creep on Composting Bradley Harriott updated the committee on the first Creep on Compost in the County. b. SC Litter Association: Litter Award Bradley Harriott brought forward a member of the Beaufort County Litter Control for the award they won from Palmetto Pride. c. Alljoy Drainage Study Results (for information only) Ryne Phillips, Director of Water Resources, Seamon Whiteside, presented a PowerPoint of the Alljoy Drainage Study Results. d. Clerk of Court Renovations Discussion 8. Agenda Items a. Update on Stormwater Utility Fee Study and Restructure - Jared Fralix, Assistant County Administrator (30 min) Taylor Brewer, Stormwater Program Manager, provided an update on the Stormwater Utility Fee Study and Restructure. Please watch the video stream on the county's website to view the full update. https://beaufortcountysc.new.swagit.com/videos/404301 b. Marine Project Prioritization Discussion (FISCAL IMPACT: There is no fiscal impact at this time. This is for discussion only.) - Bryan Bauer, PE, Director or Engineering (5 Minutes) Motion: It was moved by Committee Member Tabernik, seconded by Ex-Officio Howard to put the item on the floor for discussion. Bryan Bauer, Director of Engineering, presented a spreadsheet to the committee about the prioritization of the marine projects in the county. Please watch the video stream on the county's website to view the full discussion. https://beaufortcountysc.new.swagit.com/videos/404301 c. BC Connect App | One Year Service Progress Report (FISCAL IMPACT: No Fiscal Impact) - Jared Fralix and Bradley Harriott, 10 minutes Motion: It was moved by Council Member Dawson, seconded by Committee Vice-Chair Bartholomew to put the item on the floor for discussion. Bradley Harriott, Public Works Director, provided an update on the BC Connect App. Please watch the Page 5 of 194 video stream on the county's website to view the full report. https://beaufortcountysc.new.swagit.com/videos/404301 d. Approval of a Resolution for a Memorandum of Agreement (MOA) with the Town of Bluffton for the Construction of Holly Hill Road (FISCAL IMPACT: The estimated construction cost is not expected to exceed $2,000,000. The County’s obligation will cover 50 percent of the overall project cost, capped at $1,000,000. This amount will be funded by account 2005-60-0000-54420, which currently has a balance of $1,284,520.00. ) - Jared Fralix, Assistant County Administrator (5 min) Motion: It was moved by Committee Member Tabernik, seconded by Committee Member Lawson to approve a Resolution for a Memorandum of Agreement (MOA) with the Town of Bluffton for the Construction of Holly Hill Road. The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Vice-Chair Bartholomew, Committee Member Lawson, Committee Member Reitz, Ex-Officio Howard, Committee Member Tabernik, Council Member Brown, Council Member Dawson, Council Member Glover, and Council Member Passiment. The motion passed 10:0. e. Approval of a Contract to O'Quinn Marine Construction for Broad River Boat Landing floating dock replacement ($217,500) (FISCAL IMPACT: The contract fee for materials and construction is $197,500.00. Staff recommends a 10% contingency of $19,750.00 for a total requested budget of $217,250.00. The funding for this project is from Broad River Boat Ramp Improvement Project A/H award, account # 2001-10-0000-57130-RIVER, with a balance of $400,000.00.) - Bryan Bauer, PE, (5 minutes) Motion: It was moved by Ex-Officio Howard, seconded by Council Member Dawson to approve a contract to O'Quinn Marine Construction for Broad River Boat Landing floating dock replacement ($217,500). The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Vice-Chair Bartholomew, Committee Member Lawson, Committee Member Reitz, Ex-Officio Howard, Committee Member Tabernik, Council Member Brown, Council Member Dawson, Council Member Glover, and Council Member Passiment. The motion passed 10:0. f. Approval of a Contract to Nix Construction for the construction of the Bailey Memorial Park Project ($1,982,400.00). (FISCAL IMPACT: A Contract to Nix Construction for the construction of the Bailey Memorial Park Project ($1,982,400.00) (FISCAL IMPACT: The contract fee is for the construction of the Bailey Memorial Park in the amount of $1,652,000.00 plus a 20% contingency ($330,400.00), bringing the total request to $1,982,400.00. The funding for this project will be from the 2025 GO Bond in the GL account 4013-80-1610-54420 in the amount of ($1,982,400.00) and the account balance is ($5,940,912.00). ) - Ron Lewis, Facilities Management Project Manager II, (5 mins) Motion: It was moved by Committee Member Lawson, seconded by Committee Member Tabernik to approve a contract to Nix Construction for the construction of the Bailey Memorial Park Project ($1,982,400.00). The Vote - Voting Yea: Committee Vice-Chair Bartholomew, Committee Member Lawson, Committee Member Reitz, Ex-Officio Howard, Committee Member Tabernik, Council Member Brown, Council Member Dawson, Council Member Glover, and Council Member Passiment. Voting Nay: Committee Chair Cunningham. The motion passed 9:1. Page 6 of 194 g. Approval of a contract award to Nix Construction Inc. for the design and build of a Pedestrian Walkway and Bridge Project at the Hilton Head Island Airport ($243,000.00) (FISCAL IMPACT: The South Carolina Aeronautics Commission (SCAC) will fund 100% of the total cost ($243,000.00) of the Pedestrian Walkway and Bridge Project through an Entitlement Grant. Funding Source: GL 5402-90-0000-57130 Balance: $10,325,948.44 CONTINGENT UPON FINAL SCAC GRANT APPROVAL (anticipated 11/2026)) - Jon Rembold, Airports Director, 3 minutes Motion: It was moved by Committee Member Tabernik, seconded by Committee Member Lawson to approve a contract award to Nix Construction Inc. for the design and build of a Pedestrian Walkway and Bridge Project at the Hilton Head Island Airport ($243,000.00). The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Vice-Chair Bartholomew, Committee Member Lawson, Committee Member Reitz, Ex-Officio Howard, Council Member Brown, Council Member Dawson, Council Member Glover, and Council Member Passiment. The motion passed 9:0. * Committee Member Tabernik stepped out h. Approval of Change Orders 1 and 2 for Beaufort Executive Airport Hangar Construction Project - Site Development ($288,393.61) (FISCAL IMPACT: The total value of Change Orders No. 1 and No. 2 is $288,393.61, increasing the contract amount from $1,982,494.99 to $2,270,888.60. The change orders will be charged to airport funds under the following account: GL Code: 5102-90-0000-57130 | SCAC Grant - Current Balance: $1,157,357.73 GL Code: 5100-90-0000-54100 | ARPA Grant - Current Balance: $1,019,233.48 ) - Jon Rembold, Airports Director, 3 minutes Motion: It was moved by Committee Vice-Chair Bartholomew, seconded by Committee Member Lawson to approve of Change Orders 1 and 2 for Beaufort Executive Airport Hangar Construction Project- Site Development ($288,393.61). The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Vice-Chair Bartholomew, Committee Member Lawson, Committee Member Reitz, Ex-Officio Howard, Committee Member Tabernik, Council Member Brown, Council Member Dawson, Council Member Glover, and Council Member Passiment. The motion passed 10:0. i. Approval of Task Order to McSweeney Design for the Melrose Ferry Dock Replacement Design ($946,962.50) (FISCAL IMPACT: The contract amount will be $860,875.00 to McSweeney Engineers. Staff recommends a 10% contingency for a total budget request of $946,962.50 to come from account # 2002-10-0000-54500-CIP which has a current amount of $1,432,085.00, and account 4000-80-1243-54500-27007 which has an amount of $150,000.) - Bryan Bauer, P.E., ENV SP, Director (5 minutes) Motion: It was moved by Committee Member Lawson, seconded by Committee Member Tabernik to approve a Task Order to McSweeny Design for the Melrose Ferry Dock Replacement Design ($946,962.50). The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Vice-Chair Bartholomew, Committee Member Lawson, Committee Member Reitz, Ex-Officio Howard, Committee Member Tabernik, Council Member Brown, Council Member Dawson, Council Member Glover, and Council Member Passiment. The motion passed 10:0. Page 7 of 194 j. Approval of change order to Parrish & Partners for the Burnt Church Pathway ($63,936) (FISCAL IMPACT: The change order for additional engineering services for redesign of a portion of the project sidewalk is $58,126. Staff recommends a 10% contingency of $5,810 for a total budget increase of $63,936. The funding for this project is from Account No. 4705-80-0000- 54500 PTHWY with a current balance of $17,226,840.32) - Bryan Bauer, Director of Engineering (5 min) Motion: It was moved by Council Member Brown, seconded by Committee Member Lawson to approve a change order to Parrish & Partners for the Burnt Church Pathway ($63,936). The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Vice-Chair Bartholomew, Committee Member Lawson, Committee Member Reitz, Ex-Officio Howard, Committee Member Tabernik, Council Member Brown, Council Member Dawson, Council Member Glover, and Council Member Passiment. The motion passed 10:0. k. Approval of a Resolution authorizing the County Administrator to pursue condemnation for a portion of a parcel as specified on EXHIBIT “A” associated with right of way acquisition for Lady’s Island Middle School Access Road as part of the 2018 One Cent Referendum. (FISCAL IMPACT: Condemnation expenses range from $5,000 - $15,000 plus owner compensation for R/W. The compensation for the parcel is specified on attached EXHIBIT “A” as $465,700. The condemnation will be funded by 2018 One Cent Referendum Account # 4705-80-0000-54500- LIMP with a current balance of $26,099,305.22.) - Bryan Bauer, PE, Director of Engineering (5 min) Motion: It was moved by Committee Member Tabernik, seconded by Ex-Officio Howard to approve a Resolution authorizing the County Administrator to pursue condemnation for a portion of a parcel as specified on EXHIBIT "A" associated with the right of way acquisition for Lady's Island Middle School Road Access Road as part of the 2018 Once Cent Referendum. The Vote - Voting Yea: Committee Chair Logan Cunningham, Committee Member Lawson, Committee Member Reitz, Ex-Officio Howard, Committee Member Tabernik, Council Member Brown, Council Member Dawson, Council Member Glover, and Council Member Passiment. Voting Nay: Committee Vice-Chair Bartholomew. The motion passed 9:1. 9. Adjournment Ratified: Page 8 of 194 BEAUFORT COUNTY PUBLIC FACILITIES COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: INFORMATIONAL ITEM: AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP) LIST FOR HILTON HEAD ISLAND AIRPORT (HXD) AND BEAUFORT EXECUTIVE AIRPORT (ARW). MEETING NAME AND DATE: Public Facilities Committee November 16, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: N/A PRESENTER INFORMATION: Jon Rembold, A.A.E., Airports Director (3 min.) ITEM BACKGROUND: The National Airports Capital Improvement Plan is an internal FAA document that serves as the primary planning tool for identifying and prioritizing critical airport development and associated capital needs for the National Airspace System. Each year the FAA requests a project list from each airport that receives project funding. This is an informational update to brief Council on the ARW and HXD lists. FISCAL IMPACT: N/A APPROVAL HISTORY: This item was presented to the Airports Board at the meeting on November 5, 2026. Page 9 of 194 FY28 - FY32 Capital Improvement Plan LOC ID ARW Project Funding Plan FAA Fiscal Year Project Name and Brief Description NEPA Submission date Pavement Rehabilitation Projects Insert PCI Total Project Cost Fed Share AIP Entitlements AIG Funding ATP/FCT Funding State Participation Sponsor Participation PFC Funds Additional Funds Requested Funds Cross check (Should equal zero) Entitlement Carryover $150,000 $268,520 NPE Funding $150,000 Planned 2027 Partial Parallel Taxiway (without significant wetland impact) - Construction Beaufort Executive Airport Finding of No Significant Impact/Record of Decision for Phase I Projects Reevaluation (August 2025) $6,238,013 $5,614,212 $300,000 $268,520 $311,901 $311,901 $5,045,692 $0.00 Resealing Existing T-Hangar Roof (SCAC) $0 $0 Entitlement Carryover $0 $0 NPE Funding $150,000 2028 Ramp Rehabilitation and Expansion (Design and Bidding) Beaufort Executive Airport Finding of No Significant Impact/Record of Decision for Phase I Projects Reevaluation (August 2025) $156,800 $141,120 $150,000 $7,840 $7,840 -$8,880 $0.00 ALP Update $450,000 $405,000 $0 $22,500 $22,500 $405,000 $0.00 Entitlement Carryover $0 $0 NPE Funding $150,000 2029 Ramp Rehabilitation (Construction) $150,000 $0 $0 -$150,000 $0.00 Perimeter Fencing and Gates (Design-Bidding) $0 $0 $0 $0 $0.00 Entitlement Carryover $0 $0 NPE Funding $150,000 2030 Ramp Expansion (Construction) $2,083,275 $1,874,948 $150,000 $104,164 $104,164 $1,724,948 $0.00 Expand Automobile Parking Lot $0 $0 $0 $0 $0.00 Entitlement Carryover $0 $0 NPE Funding $150,000 2031 Old Runway Rehabilitation and Aircraft Parking $1,319,875 $1,187,888 $150,000 $65,994 $65,994 $1,037,888 $0.00 Perimeter Fencing and Gates (Construction) $0 $0 $0 $0 $0.00 Entitlement Carryover $0 $0 NPE Funding $150,000 2032 RSA 07/25 (Design and Bidding) $771,530 $694,377 $150,000 $38,577 $38,577 $544,377 $0.00 ** Add additional rows as needed Check project eligibility (AIP Handbook) Page 10 of 194 FY28 - FY32 Capital Improvement Plan LOC ID HXD Project Funding Plan FAA Fiscal Year Project Name and Brief Description NEPA Submission date Pavement Rehabilitation Projects Insert PCI Total Project Cost Fed Share AIP Entitlements AIG Funding ATP/FCT Funding State Participation Sponsor Participation PFC Funds Additional Funds Requested Funds Cross check (Should equal zero) Entitlement Carryover $842,100 $913,640 $1,263,584 NPE Funding $1,300,000 $250,000 Planned 2027 Runway 03/21 Rehabilitation (Design and Bidding) $377,350 $339,615 $339,615 $0 $37,735 $0 $0 $0.00 26, 28, 30, 32 Hunter and 154 Beach City demolition (SCAC) $300,000 $300,000 $0 26 Hunter design documents (SCAC) $250,000 $250,000 $0 03/21 EMAS Seal Replacement (SCAC) $300,000 $300,000 $0 Parking Gates Design (SCAC) $31,000 $31,000 Entitlement Carryover $1,802,485 $913,640 $594,849 NPE Funding $1,300,000 $250,000 2028 Land Acquisition Reimbursement (Parcels R510 008 000 0307 0000 [30 Hunter Road], R510 004 000 0323 0000 [32 Hunter Road]) - Terminal Area Development $3,325,820 $2,993,238 $2,079,598 $913,640 $332,582 $0 $0 $0.00 Commercial Service Terminal Phase II (Repackaging, Bidding, and Construction $46,329,632 $10,000,000 $10,000,000 $0 $0 $36,329,632 Recapturing displaced thresholds and departure surface clearing Environmental Documentation $350,000 $315,000 $315,000 $0 $35,000 $0 $0 $0.00 Entitlement Carryover $707,887 $477,267 NPE Funding $1,300,000 $250,000 2029 Recapturing displaced thresholds and departure surface clearing (Design and Bidding) $164,700 $148,230 $148,230 $16,470 $0 $0 $0.00 03/21 EMAS Seal Replacement (SCAC) $300,000 $0 $0 $300,000 $0 $0 $0.00 Entitlement Carryover $1,859,657 $0 $410,797 NPE Funding $1,300,000 $250,000 2030 Runway 03/21 Rehabilitation (Construction) $4,952,900 $4,457,610 $3,159,657 $495,290 $0 $1,297,953 $0.00 Recapturing displaced thresholds and departure surface clearing (Construction) $2,580,430 $2,322,387 $0 $165,507 $92,537 $2,322,387 $0.00 Entitlement Carryover $0 $0 $0 NPE Funding $1,300,000 $250,000 2031 Address Modifications to Standards (1) $10,336,005 $9,302,405 $1,300,000 $250,000 $783,600 $8,002,405 $0.00 Taxiway F Relocation (Design-Bidding) $1,649,400 $1,484,460 $0 $0 $164,940 $1,484,460 $0.00 Entitlement Carryover $0 $0 $0 NPE Funding $1,300,000 $250,000 2032 Address Modifications to Standards (2) $10,431,315 $9,388,184 $1,300,000 $250,000 $793,132 $8,088,183 $0.00 Entitlement Carryover $0 $0 $0 NPE Funding $1,300,000 $250,000 2033 Taxiway F Relocation (Construction) $25,841,900 $23,257,710 $1,300,000 $250,000 $2,334,190 $21,957,710 $0.00 ** Add additional rows as needed Check project eligibility (AIP Handbook) Page 11 of 194 BEAUFORT COUNTY PUBLIC FACILITIES COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: A RESOLUTION TO ACCEPT A SOUTH CAROLINA AERONAUTICS COMMISSION (SCAC) ENTITLEMENT GRANT FOR THE HILTON HEAD ISLAND AIRPORT (HXD) LEAKAGE AND RETENTION STUDY — CONTINGENT UPON FINAL GRANT OFFER. MEETING NAME AND DATE: Public Facilities Committee November 16, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval of a resolution to accept a SCAC Entitlement Grant in the amount of $11,000 for the HXD Leakage and Retention Study — Contingent upon the final grant offer. PRESENTER INFORMATION: Jon Rembold, A.A.E., Airports Director (3 min.) ITEM BACKGROUND: HXD seeks to better understand air travel demand generated by its catchment area and determine how much of that demand uses HXD versus competing airports, particularly Savannah/Hilton Head International Airport. Passenger counts at HXD alone do not capture travelers who use other airports. The proposed study will estimate total catchment-area demand and passenger retention and leakage; profile destination markets and airline shares; and provide supporting tables and maps. The findings will support airline recruitment, retention and expansion discussions, identify opportunities to recapture passengers, and guide airport marketing and air service planning, including efforts to strengthen year-round connectivity. The proposed scope includes a review of available ticketing and U.S. Department of Transportation origin-and-destination data, or agreed- upon equivalent sources, for a mutually agreed-upon 12-month period. Deliverables include an electronic draft report, a final PDF report with supporting tables and maps, and one findings review with Airport staff. FISCAL IMPACT: The proposed total study cost is $11,000, with funding requested as follows: SCAC Entitlement Grant: $11,000 Local match: $0 Funding Source: GL 5402-90-0000-57130 Available balance: $6,894,212.83 CONTINGENT UPON FINAL GRANT OFFER APPROVAL HISTORY: The Airports Board recommended approval of the Resolution to accept the SCAC grant at the monthly meeting on November 5, 2026. Page 12 of 194 RESOLUTION 2026/ A RESOLUTION TO ACCEPT A SOUTH CAROLINA AERONAUTICS COMMISSION (SCAC) ENTITLEMENT GRANT FOR THE HILTON HEAD ISLAND AIRPORT (HXD) LEAKAGE AND RETENTION STUDY - CONTINGENT UPON FINAL GRANT OFFER WHEREAS, HXD seeks to better understand air travel demand generated by its catchment area, including the extent to which travelers use HXD or competing airports, particularly Savannah/Hilton Head International Airport; and WHEREAS, HXD proposes to conduct an air service development leakage and retention study to estimate catchment-area travel demand, measure passenger retention and leakage, and profile destination markets and airline shares; and WHEREAS, the study will provide market data to support airline recruitment, retention and expansion discussions, identify opportunities to recapture passengers, and guide airport marketing and air service planning, including efforts to strengthen year-round connectivity; and WHEREAS, HXD has applied to SCAC requesting 100% Commercial Service Airport Entitlement Funds in the amount of $11,000 to fund professional consulting services for the Leakage and Retention Study; and NOW, THEREFORE, BE IT RESOLVED that Beaufort County Council, duly assembled, does hereby authorize the acceptance of a SCAC entitlement grant in the amount of $11,000 for the HXD Leakage and Retention Study, contingent upon the final SCAC grant offer. Adopted this ____ day of __________, 2026 COUNTY COUNCIL OF BEAUFORT COUNTY BY: Alice Howard, Chairman ATTEST: Sarah W. Brock, Clerk to Council Page 13 of 194 1 PROJECT GRANT APPLICATION (State Aid for Development of Public Airports) SCAC Grant No: ____ (Leave blank – For SCAC Use only) Date PART I - PROJECT INFORMATION Grant Type being Requested (Check one):  2.5% State match of 95% AIP / AIG Grant  5% State match of 90% AIP  50% Terminal Building Development Grant (NTE $500,000)  60% State – Local Airport Development Grant  75% State – Local Airport Maintenance Grant  85% Non-NPIAS / Un classified, publicly owned, Airport Maintenance or Development Grant  90% NPIAS Airport Secondary Runway Redevelopment Grant  100% Commercial Service Airport Entitlement Funds  100% Commercial Service Special Allocation  100% Distribution of Earmarked Funds The (Airport Sponsor) ____________ (herein called the “Sponsor” ) hereby makes appl ication to the South Carolina Aeronautics Commission (herein designated “SCAC") for a grant of State funds pursuant to applicable statutes, regulations, and policies, for the purpose of aiding in financing a project (herein called the "Project") for the development of the (Airport Name) _________ (herein called the "Airport") located in the County of (County Name) ________ in the State of South Carolina. It is proposed that the project consist of the following described airport development (Insert brief project description / title below): all as more particularly described in the plans and specifications separately submitted to SCAC on (Date) , which are made a part hereof by reference. If applicable, please list numbers of all associated AIP / AIG Grant(s): ________________________ ________________________________________________________________________________ (Note: AIP State Match Grants will not be issued in advance of their associated Federal Grant(s). 10/13/2026 Hilton Head Island Airport (HXD) Beaufort Hilton Head Island Airport None Hilton Head Island Airport request Entitlement Funds to conduct an air service development Leakage study to understand the details of out market and catchment area. The data will aid in developing targeted airline recruitment packages, marketing and advertising targets and other air service future efforts. Page 14 of 194 2 PART II - REPRESENTATIONS The Sponsor hereby represents and certifies as follows: 1. Legal Authority. The Sponsor has the legal power and authority: (A) To do all things necessary to undertake and carryout the Project in conformity with the applicable statues, regulations, and policies; (B) To accept, receive and disburse grant funds from the State of South Carolina in aid of the project on the terms and conditions stated in the applicable statutes, regulations, policies, and proposed grant agreement, and; 2. Funds. The Sponsor now has on deposit $ _______ for use in defraying the costs of the Project. The present status of these funds is as follows: The Sponsor hereby designates (insert name and job title of staff member): Name: ____ Title: __________________________________________ to receive payments representing SCAC's share of the Project costs. Printed Name of Sponsoring Agency's Representative Signature of Sponsoring Agency's Representative Representative Title Please list the full name, title, and complete USPS mailing address of the authorized person to whom the Grant offer and agreement should be mailed: Name, Title: __________________________________________________ Address: _____________________________________________________ __________________________________________________________ Airport Finance Manager Brian Cronin Stephen J Parry Deputy Airport Director Jon Rembold, Airport Director 26 Hunter Road Hilton Head Island SC 29926 Page 15 of 194 3 ATTACHMENT A THE FOLLOWING IS A SUMMARY OF THE ACTUAL PROJECT COSTS: ITEM TOTAL COST SPONSOR'S SHARE OF COST FEDERAL SHARE OF COST STATE SHARE OF COST AMOUNT AMOUNT AMOUNT 1. PLANNING COST 2. LAND COST 3. CONSTRUCTION COST 4. ENGINEERING COST 5. ADMINISTRATIVE COST 6. MISCELLANEOUS 7. TOTAL ALL ACTUAL PROJECT COSTS Rules for Reimbursing Project Costs Prior to the Grant Execution Date: Unless specifically recommended by the Executive Director and approved in advance by the Commission, all project costs must be incurred after the execution date of the Airport Development or Aviation Education grant. Exceptions to this rule include:  Land or avigation easement acquisitions  Airfield facility emergencies not covered by insurance  Project exceptions identified in the relevant section of the FAA’s AIP Handbook This policy does not prohibit grant amendments for change orders that arise during construction, provided they are communicated with SCAC Airport Development staff in advance and approved by Commission. $11,000 $11,000 $11,000 $11,000 Page 16 of 194 4 ATTACHMENT B DOCUMENTATION SUPPORT 1. Is this project a result of facility requirements determined by a Master Plan, Airport Layout Plan (ALP), the South Carolina Airport System Plan, or a revision to the ALP? ______Yes _______No If so, indicate FAA or SCAC approval date: 2. Does this project require environmental study / documentation under the National Environmental Policy Act of 1969 (NEPA)? Yes No 3. If so, please indicate the document type and its status:  Categorical Exclusion (CatEx)  Environmental Assessment (EA) _____________________________________________  Environmental Impact Statement (EIS) 4. Have all previous projects that involved federal and / or state funds been completed? Yes No (List all Open Federal and State Grants below) ________________________________________________________________________________ _________________________________________________________________________________ 5. If the State is unable to participate to the extent requested, what is the Sponsor's ability to fund a share greater than the State match? 6. Name of Regional Planning Council which airport is located: 7. Has Federal Application Form 424 been submitted to the Inter -agency Council on Public Transportation (State Clearinghouse) in accordance with Section 57-3-1050? ________Yes No 8. The following action has been taken by the local governing body to provide steps toward protective zoning of the airspace and land surrounding the airport. Describe actions by the Sponsor and governing body related to land use planning and zoning ordinances. 9. Anticipated date construction or planning / design project is to commence: Start Date: Ending Date: X X X None Lowcountry Council Of Governments NA NA Please see the attached Grant list. January 2027 January 2028 Page 17 of 194 5 ATTACHMENTS  Project information and Justification Statement  Federal and State outstanding grant list.  Bid tabulation (Construction projects) or appropriate cost data  Professional Services Work Authorization / Task Order  Copy of signed Federal Application Form 424 (if this request is associated with an FAA AIP / AIG Grant)  Copy of executed Federal AIRPORT INFRASTRUCTURE GRANT AGREEMENT (if this request is associated with an FAA AIP / AIG Grant)  Earmarked Funds spending plan  Project Environmental Documentation (Categorical Exclusion – CatEx) if required (Revised: September 6, 2026) Page 18 of 194 HHH Leakage and Retention Study | 1 Leakage and Retention Study Hilton Head Island Airport (HHH) | Scope of Work and Funding Justification Requested funding $11,000 in state entitlement funds for professional consulting services. Purpose and justification Hilton Head Island Airport requests funding for a leakage and retention study to quantify the air travel demand generated by its catchment area and determine how much of that demand uses HHH versus competing airports, particularly Savannah/Hilton Head International Airport. Airport passenger counts alone do not capture travelers using other airports. The study will provide market evidence for airline recruitment, retention and expansion discussions, identify passenger recapture opportunities, and guide airport marketing and air service planning, including efforts to strengthen year-round connectivity. The requested expenditure is for airport-specific research and analysis supporting these activities. Scope of work 1 Define the market Confirm the catchment area and competing airports with Airport staff; prepare a ZIP code catchment map, population and sample summary, and drive time map. 2 Estimate travel demand Analyze Airport Research Center (ARC) ticketing data and applicable US DOT origin and destination data, or agreed equivalent sources, for the latest mutually agreed available 12-month period. Document sources, sample coverage, extrapolation methods and limitations. 3 Measure retention and leakage Estimate total catchment demand and the passengers and percentage retained at HHH or using competing airports, separating domestic and international travel. 4 Profile destinations and airlines Rank destination markets and airline shares; report estimated origin and destination passengers, passengers per day each way, average fares and passenger revenue metrics where supported by the data. Include resident and visitor shares where supportable and detail for HHH and principal competing airports. 5 Report findings Summarize results and implications for airport air service development and passenger recapture. Provide tables and maps supporting and illustrating the data for use by HHH. Deliverables and cost An electronic draft report, final PDF report with supporting tables and maps, and one findings review with Airport staff. Proposed total fee: $11,000, including required data acquisition and normal project expenses, subject to consultant confirmation. Study period, completion schedule and any seasonal breakout will be agreed before authorization. Page 19 of 194 HHH Leakage and Retention Study | 2 Draft Consultant Task Order Hilton Head Island Airport Leakage and Retention Study Task order number [Insert] Date [Insert] Owner [Airport sponsor legal name] Consultant [Consultant legal name] Governing agreement [Agreement title and effective date] Authorization and services Upon execution and written notice to proceed by the Owner, the Consultant shall perform the scope of work on the preceding page, incorporated into this task order. Before commencing analysis, the parties shall confirm the catchment area, comparison airports, data sources and 12-month study period. The Consultant shall disclose material data limitations and distinguish estimates from observed values. Deliverables and review The Consultant shall submit an electronic draft report for one consolidated Owner review, address comments within the agreed scope, deliver the final PDF report and supporting tables and maps, and conduct one findings review with Airport staff. The Owner shall provide available airport information and timely decisions on study parameters and draft comments. Final acceptance will be based on completion of the agreed scope and deliverables. Schedule Notice to proceed [Date] Draft report [Date] Final report [Date] The parties shall agree on these dates before execution. Schedule changes require written agreement. Compensation and payment Proposed lump sum fee: $11,000, including professional services, required data acquisition and normal project expenses, subject to Consultant confirmation before execution. Payment shall follow the governing agreement and the following agreed billing schedule: [Insert]. The Consultant shall identify this task order and services completed on each invoice. Compensation shall not exceed $11,000 without a written amendment approved by the Owner. Scope changes and agreement terms Seasonal or monthly breakouts, additional survey work, and other services beyond the stated scope require agreement on inclusion in the $11,000 fee or a written amendment before work begins. This task order is subject to the governing agreement, including its applicable insurance, records, confidentiality and payment provisions. Applicable state funding conditions shall be incorporated before execution. Acceptance Owner authorized representative Signature __________________________ Date __________ Name and title _____________________________________ Consultant authorized representative Signature __________________________ Date __________ Name and title _____________________________________ Page 20 of 194 Federal Grant # Description Grant ID Award Amount 64 Acquire Land for Development-28 Hunter Rd-Reimbursement 34500300642026 $ 1,358,322.00 63 Acquire Land for Development-26 Hunter Rd-Reimbursement 34500300632026 1,819,043.00 62 Taxiway F ROFA 34500300622025 306,022.00 61 Air Traffic Control Tower 34500300612025 300,000.00 60 Drainage Construction 34500300602025 1,390,569.00 59 SJBC Relocation EA (FAA AIP) 34500300592024 325,679.00 57 ALP Study (FAA BIL AIG) 34500300572024 825,757.00 56 ATP (BIL) 34500300562024 5,000,000.00 State Grant # Description Grant ID Award Amount SCAC 23-025 SCAC 23-025-Taxiway F Strengthening SCAC 23-025 $ 378,044.00 SCAC 24-025 Perform Terminal Improvement SCAC 24-025 750,000.00 SCAC 23-029 Terminal Construction Project SCAC 23-029 12,000,000.00 All Grants Summary - Updated 10/13/2026 Page 21 of 194 BEAUFORT COUNTY PUBLIC FACILITIES COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: A RESOLUTION TO ACCEPT A SOUTH CAROLINA AERONAUTICS COMMISSION (SCAC) ENTITLEMENT GRANT FOR THE HILTON HEAD ISLAND AIRPORT (HXD) TERMINAL PARKING GATE ELECTRICAL AND DATA INFRASTRUCTURE PROJECT — CONTINGENT UPON THE FINAL GRANT OFFER. MEETING NAME AND DATE: Public Facilities Committee November 16, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval of a resolution to accept a SCAC Entitlement Grant in the amount of $35,905 for the HXD Terminal Parking Gate Electrical and Data Infrastructure Project — Contingent upon the final grant offer. PRESENTER INFORMATION: Jon Rembold, A.A.E., Airports Director (3 min.) ITEM BACKGROUND: HXD continues to experience increased demand for terminal parking due to growth in passenger traffic, rental car operations, and airport staffing. The existing terminal parking facilities and infrastructure present operational challenges in managing vehicle entry, exit, and parking access. HXD has engaged a professional parking management contractor to implement and operate an improved terminal parking management system. Dedicated electrical power and data connectivity at the parking access gates are needed to support reliable equipment operation and access control. The proposed project will install the required electrical and data infrastructure throughout the terminal parking facilities. These improvements are expected to enhance operational efficiency, strengthen access management, improve the reliability of parking transactions, support effective management of available parking resources, and protect an important airport revenue source. FISCAL IMPACT: The total project cost is estimated at $35,905.00, with funding allocated as follows: SCAC Entitlement Grant: $35,905.00 Local match: $0 Funding Source: GL 5402-90-0000-57130 Balance: $6,894,212.83 CONTINGENT UPON FINAL GRANT OFFER APPROVAL HISTORY: The Airports Board recommended approval of the Resolution to accept the SCAC grant at the monthly meeting on November 5, 2026. Page 22 of 194 RESOLUTION 2026/ A RESOLUTION TO ACCEPT A SOUTH CAROLINA AERONAUTICS COMMISSION (SCAC) ENTITLEMENT GRANT FOR THE HILTON HEAD ISLAND AIRPORT (HXD) TERMINAL PARKING GATE ELECTRICAL AND DATA INFRASTRUCTURE PROJECT - CONTINGENT UPON FINAL GRANT OFFER WHEREAS, HXD continues to experience increased demand for terminal parking as a result of growth in passenger enplanements, rental car operations, and airport staffing; and WHEREAS, the existing terminal parking facilities and infrastructure present operational challenges in managing vehicle entry, exit, and overall parking access; and WHEREAS, HXD has engaged a professional parking management contractor to implement and operate an improved terminal parking management system, which requires dedicated electrical power and data connectivity at the parking access gates to support reliable operation and access control; and WHEREAS, the proposed Terminal Parking Gate Electrical and Data Infrastructure Project will provide the necessary electrical and data infrastructure to support the parking gate equipment, enhance operational efficiency, strengthen access management, improve the reliability of parking transactions, and support effective management of airport parking resources; and WHEREAS, HXD has applied to SCAC requesting 100% Commercial Service Airport Entitlement Funds in the amount of $35,905 to offset the cost of installing the required electrical and data infrastructure; and NOW, THEREFORE, BE IT RESOLVED that Beaufort County Council, duly assembled, does hereby authorize the acceptance of a SCAC entitlement grant in the amount of $35,905 for the HXD Terminal Parking Gate Electrical and Data Infrastructure Project, contingent upon the final SCAC grant offer. Adopted this ____ day of __________, 2026 COUNTY COUNCIL OF BEAUFORT COUNTY BY: Alice Howard, Chairman ATTEST: Sarah W. Brock, Clerk to Council Page 23 of 194 1 PROJECT GRANT APPLICATION (State Aid for Development of Public Airports) SCAC Grant No: ____ (Leave blank – For SCAC Use only) Date PART I - PROJECT INFORMATION Grant Type being Requested (Check one):  2.5% State match of 95% AIP / AIG Grant  5% State match of 90% AIP  50% Terminal Building Development Grant (NTE $500,000)  60% State – Local Airport Development Grant  75% State – Local Airport Maintenance Grant  85% Non-NPIAS / Un classified, publicly owned, Airport Maintenance or Development Grant  90% NPIAS Airport Secondary Runway Redevelopment Grant  100% Commercial Service Airport Entitlement Funds  100% Commercial Service Special Allocation  100% Distribution of Earmarked Funds The (Airport Sponsor) ____________ (herein called the “Sponsor” ) hereby makes appl ication to the South Carolina Aeronautics Commission (herein designated “SCAC") for a grant of State funds pursuant to applicable statutes, regulations, and policies, for the purpose of aiding in financing a project (herein called the "Project") for the development of the (Airport Name) _________ (herein called the "Airport") located in the County of (County Name) ________ in the State of South Carolina. It is proposed that the project consist of the following described airport development (Insert brief project description / title below): all as more particularly described in the plans and specifications separately submitted to SCAC on (Date) , which are made a part hereof by reference. If applicable, please list numbers of all associated AIP / AIG Grant(s): ________________________ ________________________________________________________________________________ (Note: AIP State Match Grants will not be issued in advance of their associated Federal Grant(s). 10/13/2026 Hilton Head Island Airport (HXD) Beaufort Hilton Head Island Airport None Hilton Head Island Airport request Entitlement Funds for parking lot gate electrical and data facilty construction. Total between 4 invoices/quotes $35,905 Page 24 of 194 2 PART II - REPRESENTATIONS The Sponsor hereby represents and certifies as follows: 1. Legal Authority. The Sponsor has the legal power and authority: (A) To do all things necessary to undertake and carryout the Project in conformity with the applicable statues, regulations, and policies; (B) To accept, receive and disburse grant funds from the State of South Carolina in aid of the project on the terms and conditions stated in the applicable statutes, regulations, policies, and proposed grant agreement, and; 2. Funds. The Sponsor now has on deposit $ _______ for use in defraying the costs of the Project. The present status of these funds is as follows: The Sponsor hereby designates (insert name and job title of staff member): Name: ____ Title: __________________________________________ to receive payments representing SCAC's share of the Project costs. Printed Name of Sponsoring Agency's Representative Signature of Sponsoring Agency's Representative Representative Title Please list the full name, title, and complete USPS mailing address of the authorized person to whom the Grant offer and agreement should be mailed: Name, Title: __________________________________________________ Address: _____________________________________________________ __________________________________________________________ Airport Finance Manager Brian Cronin Stephen J Parry Deputy Airport Director Jon Rembold, Airport Director 26 Hunter Road Hilton Head Island SC 29926 Page 25 of 194 3 ATTACHMENT A THE FOLLOWING IS A SUMMARY OF THE ACTUAL PROJECT COSTS: ITEM TOTAL COST SPONSOR'S SHARE OF COST FEDERAL SHARE OF COST STATE SHARE OF COST AMOUNT AMOUNT AMOUNT 1. PLANNING COST 2. LAND COST 3. CONSTRUCTION COST 4. ENGINEERING COST 5. ADMINISTRATIVE COST 6. MISCELLANEOUS 7. TOTAL ALL ACTUAL PROJECT COSTS Rules for Reimbursing Project Costs Prior to the Grant Execution Date: Unless specifically recommended by the Executive Director and approved in advance by the Commission, all project costs must be incurred after the execution date of the Airport Development or Aviation Education grant. Exceptions to this rule include:  Land or avigation easement acquisitions  Airfield facility emergencies not covered by insurance  Project exceptions identified in the relevant section of the FAA’s AIP Handbook This policy does not prohibit grant amendments for change orders that arise during construction, provided they are communicated with SCAC Airport Development staff in advance and approved by Commission. $35,905 $35,905 $35,905 $35,905 Page 26 of 194 4 ATTACHMENT B DOCUMENTATION SUPPORT 1. Is this project a result of facility requirements determined by a Master Plan, Airport Layout Plan (ALP), the South Carolina Airport System Plan, or a revision to the ALP? ______Yes _______No If so, indicate FAA or SCAC approval date: 2. Does this project require environmental study / documentation under the National Environmental Policy Act of 1969 (NEPA)? Yes No 3. If so, please indicate the document type and its status:  Categorical Exclusion (CatEx)  Environmental Assessment (EA) _____________________________________________  Environmental Impact Statement (EIS) 4. Have all previous projects that involved federal and / or state funds been completed? Yes No (List all Open Federal and State Grants below) ________________________________________________________________________________ _________________________________________________________________________________ 5. If the State is unable to participate to the extent requested, what is the Sponsor's ability to fund a share greater than the State match? 6. Name of Regional Planning Council which airport is located: 7. Has Federal Application Form 424 been submitted to the Inter -agency Council on Public Transportation (State Clearinghouse) in accordance with Section 57-3-1050? ________Yes No 8. The following action has been taken by the local governing body to provide steps toward protective zoning of the airspace and land surrounding the airport. Describe actions by the Sponsor and governing body related to land use planning and zoning ordinances. 9. Anticipated date construction or planning / design project is to commence: Start Date: Ending Date: X X X None Lowcountry Council Of Governments NA See attached all open Federal and State Grant List October 2026 November 2026 Page 27 of 194 5 ATTACHMENTS  Project information and Justification Statement  Federal and State Open Grants  Bid tabulation (Construction projects) or appropriate cost data  Professional Services Quotes/ Work Authorization / Task Order  Copy of signed Federal Application Form 424 (if this request is associated with an FAA AIP / AIG Grant)  Copy of executed Federal AIRPORT INFRASTRUCTURE GRANT AGREEMENT (if this request is associated with an FAA AIP / AIG Grant)  Earmarked Funds spending plan  Project Environmental Documentation (Categorical Exclusion – CatEx) if required (Revised: September 6, 2026) Page 28 of 194 Hilton Head Island Airport State Entitlement Funding Request Project Title: Terminal Parking Gate Electrical and Data Infrastructure Project Description and Justification Hilton Head Island Airport (HXD) continues to experience increased demand for terminal parking as a result of growth in passenger enplanements, rental car operations, and airport staffing. The existing terminal parking facilities, with their aging layout and infrastructure, pose operational challenges for managing vehicle entry and exit and overall parking access. To address these challenges, the airport has engaged a professional parking management contractor to implement and operate an improved terminal parking management system. A critical component of this system is the installation of dedicated electrical power and data connectivity at each parking access gate to support reliable operation and access control. The proposed project will provide the necessary electrical and data infrastructure to support the parking gate equipment throughout the terminal parking facilities. These improvements will enhance operational efficiency, strengthen access management, improve the reliability of parking transactions, and support the airport's ability to effectively manage its available parking resources. The airport is requesting its allocated South Carolina Aeronautics Commission (SCAC) State Entitlement Funds to offset the cost of installing the required electrical and data infrastructure. The accompanying contractor quotations identify the anticipated installation costs associated with providing these essential services to each parking gate location. This investment represents a necessary infrastructure improvement that supports the airport's parking management operations, protects an important airport revenue source, and provides a foundation for continued improvements to the terminal parking system. Page 29 of 194 Federal Grant # Description Grant ID Award Amount 64 Acquire Land for Development-28 Hunter Rd-Reimbursement 34500300642026 $ 1,358,322.00 63 Acquire Land for Development-26 Hunter Rd-Reimbursement 34500300632026 1,819,043.00 62 Taxiway F ROFA 34500300622025 306,022.00 61 Air Traffic Control Tower 34500300612025 300,000.00 60 Drainage Construction 34500300602025 1,390,569.00 59 SJBC Relocation EA (FAA AIP) 34500300592024 325,679.00 57 ALP Study (FAA BIL AIG) 34500300572024 825,757.00 56 ATP (BIL) 34500300562024 5,000,000.00 State Grant # Description Grant ID Award Amount SCAC 23-025 SCAC 23-025-Taxiway F Strengthening SCAC 23-025 $ 378,044.00 SCAC 24-025 Perform Terminal Improvement SCAC 24-025 750,000.00 SCAC 23-029 Terminal Construction Project SCAC 23-029 12,000,000.00 All Grants Summary - Updated 10/13/2026 Page 30 of 194 ESTIMATE Quality Connections, LLC 6013 Vaux Rd Beaufort, SC 29906-9473 qualityconnectionsllc@gmail.com +1 (843) 592-1540 Bill to DAN NEESON HILTON HEAD AIRPORT Ship to DAN NEESON HILTON HEAD AIRPORT Estimate details Estimate no.: 1689 Estimate date: 09/15/2026 # Date Product or service Description Qty Rate Amount 1. Services 3/4 pipe 25 $15.00 $375.00 2. Services CAT 6 WIRE 1 $160.00 $160.00 3. Services GROUNDING & BOXES 1 $100.00 $100.00 4. Services UBIQUITI POINT TO POINT SYSTEM AND MOUNTS 1 $350.00 $350.00 5. Services LABOR 1 $2,500.00 $2,500.00 Note to customer -RUNNING CONNECTIONS FOR POINT-TO-POINT CONNECTIONS SYSTEM TO WEST GATE -RUNNING DATA CONNECTION FROM FIRST GATE TO SECOND GATE Total $3,485.00 Accepted date Accepted by to k e n = Page 31 of 194 INVOICE Quality Connections, LLC 6013 Vaux Rd Beaufort, SC 29906-9473 qualityconnectionsllc@gmail.com +1 (843) 592-1540 Bill to DAN NEESON HILTON HEAD AIRPORT Ship to DAN NEESON HILTON HEAD AIRPORT Invoice details Invoice no.: 1512 Terms: Net 30 Invoice date: 10/08/2026 Due date: 11/07/2026 # Date Product or service Description Qty Rate Amount 1. Services 3/4 pipe 5 $15.00 $75.00 2. Services CAT 6 WIRE 1 $160.00 $160.00 3. Services BOXES 1 $50.00 $50.00 4. Services UBIQUITI POINT TO POINT SYSTEM AND MOUNTS 1 $350.00 $350.00 5. Services LABOR 1 $1,600.00 $1,600.00 Ways to pay Note to customer -RUNNING CONNECTIONS FOR POINT-TO-POINT CONNECTIONS SYSTEM TO EAST GUARD GATE View and pay Total $2,235.00 Page 32 of 194 Credit Policy Disclosure * In the event of late payment, a 1.5% monthly late fee will be applied to overdue invoices. Page 1 of 2 Selectric 1211 Boundary St Ste B Beaufort, SC 29902-4153 US +18438129215 gaho@selectricllc.com INVOICE BILL TO HH Airport Beaufort County PO Drawer 1228 Beaufort, SC 29901 INVOICE 37171891 DATE 08/31/2026 TERMS Net 15 DUE DATE 09/15/2026 JOB NAME HH Airport - Terminal Gates 1+2 ACTIVITY QTY RATE AMOUNT Commercial:Comm. - Contract 6/29/26 - HH Airport Gates 1+2 - Re-pull existing wiring between airport terminal electrical closet and parking lot pedestal. Utilize existing wiring and add neutral wire to ensure code-compliance. - Provide and install 40A outdoor sub-panel in parking lot island to service gates 1 + 2. Add (2) 20A breakers to connect existing gate wires to. **If digging is required, Selectric LLC is not responsible for damage to anything buried underground that is not revealed and marked by SC811 and is not properly protected by conduit. Selectric LLC is not responsible for the existing condition of any existing electrical that may be impacted by the scope of work. Any additions to the scope of work will result in additional costs. 1 4,985.00 4,985.00 Commercial:Comm. - Contract ADD IF NEEDED: - If existing wire cannot be re-pulled due to its existing condition: Provide replacement #6 wire to replace existing wire between terminal electrical closet and parking lot pedestal = $3,650 1 3,650.00 3,650.00 Commercial:Comm. - Contract ADD IF NEEDED: - If conduit and wire between gate 1 and gate 2 cannot be utilized in its current condition: Provide and install up to 400ft of conduit and wire to provide 120v to gate 1 + 2 from new pedestal mounted 40A sub-panel. Make necessary electrical connections to gates and verify correct voltage. Will require SC811 and a trencher machine to trench between gates. = $6,955 1 6,955.00 6,955.00 Our preferred payment methods include credit cards and electronic funds transfers (ACH). Payments via check are acceptable upon request. Early payment discounts of up to 1.5% are offered for select services. Contact our office for discount details. SUBTOTAL 15,590.00 TAX 0.00 TOTAL 15,590.00 20270044 Line 1 $15,590.00 REC 9/3/26 RB Page 33 of 194 Credit Policy Disclosure * In the event of late payment, a 1.5% monthly late fee will be applied to overdue invoices. Page 2 of 2 Ways to pay View and pay BALANCE DUE $15,590.00 tok en= Page 34 of 194 Credit Policy Disclosure * In the event of late payment, a 1.5% monthly late fee will be applied to overdue invoices. Page 1 of 2 Selectric 1211 Boundary St Ste B Beaufort, SC 29902-4153 US +18438129215 gaho@selectricllc.com INVOICE BILL TO HH Airport Beaufort County PO Drawer 1228 Beaufort, SC 29901 INVOICE 37171892 DATE 08/31/2026 TERMS Net 15 DUE DATE 09/15/2026 JOB NAME HH Airport - Guard + Gate ACTIVITY QTY RATE AMOUNT Commercial:Comm. - Contract 6/29/26 - HH Airport Guard Shack + Gate 3 - Install ground box where existing wire between terminal electrical closet and "guard shack" panel has been cut. Pull up to 100' of wire between terminal electrical closet panel and ground box. Make connection to existing wiring going to "guard shack" panel. **If digging is required, Selectric LLC is not responsible for damage to anything buried underground that is not revealed and marked by SC811 and is not properly protected by conduit. Selectric LLC is not responsible for the existing condition of any existing electrical that may be impacted by the scope of work. Any additions to the scope of work will result in additional costs. 1 4,895.00 4,895.00 Commercial:Comm. - Contract ADD IF NEEDED: - If existing conduit and wire between terminal electrical closet and "guard shack" cannot be utilized due to its existing condition: Provide replacement #3 wire to replace the existing. Repair conduit between terminal closet panel and new ground box as needed. = $9,400 1 9,400.00 9,400.00 Commercial:Comm. - Contract ADD IF NEEDED: - If gate 3 wire and guard shack panel connections have been disconnected: Make necessary electrical connections to gate 3 and "guard shack" panel. = $300 1 300.00 300.00 Our preferred payment methods include credit cards and electronic funds transfers (ACH). Payments via check are acceptable upon request. Early payment discounts of up to 1.5% are offered for select services. Contact our office for discount details. Ways to pay SUBTOTAL 14,595.00 TAX 0.00 TOTAL 14,595.00 BALANCE DUE $14,595.00 20270044 Line 1 $14,595.00 REC 8/31/26 RB Page 35 of 194 BEAUFORT COUNTY PUBLIC FACILITIES COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: A RESOLUTION TO ACCEPT A SOUTH CAROLINA AERONAUTICS COMMISSION (SCAC) ENTITLEMENT GRANT FOR THE HILTON HEAD ISLAND AIRPORT (HXD) PEDESTRIAN AND WALKWAY BRIDGE PROJECT — CONTINGENT UPON FINAL GRANT OFFER. MEETING NAME AND DATE: Public Facilities Committee November 16, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval of a resolution to accept a SCAC Entitlement Grant in the amount of $125,000.00 for the HXD Pedestrian and Walkway Bridge Project (Design and Build) — Contingent upon final grant offer. PRESENTER INFORMATION: Jon Rembold, A.A.E., Airports Director (3 min.) ITEM BACKGROUND: HXD is experiencing increased demand for terminal parking due to growth in passenger traffic, rental car operations, and airport staffing. To address limited parking capacity, the Airports Department proposes constructing a pedestrian walkway and bridge connecting recently acquired property designated for supplemental parking to the commercial terminal parking area. The connection will provide a safe pedestrian route for airport employees and tenants, preserving existing terminal parking for passengers and rental car operations while supporting future parking improvements. FISCAL IMPACT: The $125,000 grant to offset the project cost will be allocated as follows: SCAC Entitlement Grant: $125,000 Local match: $0 Funding Source: GL 5402-90-0000-57130 Balance: $6,894,212.83 CONTINGENT UPON FINAL GRANT OFFER APPROVAL HISTORY: The Airports Board recommended approval of the Resolution to accept the SCAC grant at the monthly meeting on November 5, 2026. Page 36 of 194 RESOLUTION 2026/ A RESOLUTION TO ACCEPT A SOUTH CAROLINA AERONAUTICS COMMISSION (SCAC) ENTITLEMENT GRANT FOR THE HILTON HEAD ISLAND AIRPORT (HXD) PEDESTRIAN WALKWAY AND BRIDGE PROJECT (DESIGN AND BUILD) - CONTINGENT UPON FINAL GRANT OFFER WHEREAS, HXD is experiencing increased demand for terminal parking due to continued growth, while the existing terminal parking lot has limited capacity; and WHEREAS, HXD proposes the construction of a pedestrian walkway and bridge connecting recently acquired property designated for supplemental parking to the existing terminal parking area; and WHEREAS, the proposed pedestrian walkway and bridge will provide a safe, dedicated pedestrian route for airport employees and terminal tenants to utilize supplemental parking while preserving existing terminal parking capacity for passengers and rental car operations; and WHEREAS, HXD has applied to the SCAC requesting 100% Commercial Service Airport Entitlement Funds in the amount of $125,000 to offset project costs and supplement available airport funding; and NOW, THEREFORE, BE IT RESOLVED that Beaufort County Council, duly assembled, does hereby authorize the acceptance of a SCAC entitlement grant in the amount of $125,000 for the HXD Pedestrian Walkway and Bridge Project (Design and build) - contingent upon SCAC grant offer. Adopted this ____ day of __________, 2026 COUNTY COUNCIL OF BEAUFORT COUNTY BY: Alice Howard, Chairman ATTEST: Sarah W. Brock, Clerk to Council Page 37 of 194 1 PROJECT GRANT APPLICATION (State Aid for Development of Public Airports) SCAC Grant No: ____ (Leave blank – For SCAC Use only) Date PART I - PROJECT INFORMATION Grant Type being Requested (Check one):  2.5% State match of 95% AIP / AIG Grant  5% State match of 90% AIP  50% Terminal Building Development Grant (NTE $500,000)  60% State – Local Airport Development Grant  75% State – Local Airport Maintenance Grant  85% Non-NPIAS / Un classified, publicly owned, Airport Maintenance or Development Grant  90% NPIAS Airport Secondary Runway Redevelopment Grant  100% Commercial Service Airport Entitlement Funds  100% Commercial Service Special Allocation  100% Distribution of Earmarked Funds The (Airport Sponsor) ____________ (herein called the “Sponsor” ) hereby makes appl ication to the South Carolina Aeronautics Commission (herein designated “SCAC") for a grant of State funds pursuant to applicable statutes, regulations, and policies, for the purpose of aiding in financing a project (herein called the "Project") for the development of the (Airport Name) _________ (herein called the "Airport") located in the County of (County Name) ________ in the State of South Carolina. It is proposed that the project consist of the following described airport development (Insert brief project description / title below): all as more particularly described in the plans and specifications separately submitted to SCAC on (Date) , which are made a part hereof by reference. If applicable, please list numbers of all associated AIP / AIG Grant(s): ________________________ ________________________________________________________________________________ (Note: AIP State Match Grants will not be issued in advance of their associated Federal Grant(s). 10/13/2026 Hilton Head Island Airport (HXD) Hilton Head Island Airport Beaufort Construction of a Pedestrian Walkway and Bridge to connect a parking area to the commercial terminal None Page 38 of 194 2 PART II - REPRESENTATIONS The Sponsor hereby represents and certifies as follows: 1. Legal Authority. The Sponsor has the legal power and authority: (A) To do all things necessary to undertake and carryout the Project in conformity with the applicable statues, regulations, and policies; (B) To accept, receive and disburse grant funds from the State of South Carolina in aid of the project on the terms and conditions stated in the applicable statutes, regulations, policies, and proposed grant agreement, and; 2. Funds. The Sponsor now has on deposit $ _______ for use in defraying the costs of the Project. The present status of these funds is as follows: The Sponsor hereby designates (insert name and job title of staff member): Name: ____ Title: __________________________________________ to receive payments representing SCAC's share of the Project costs. Printed Name of Sponsoring Agency's Representative Signature of Sponsoring Agency's Representative Representative Title Please list the full name, title, and complete USPS mailing address of the authorized person to whom the Grant offer and agreement should be mailed: Name, Title: __________________________________________________ Address: _____________________________________________________ __________________________________________________________ Commercial Entitlement Brian Cronin Airport Finance Manager Stephen J Parry Deputy Airport Director 26 Hunter Road Hilton Head Island SC 29926 Jon Rembold, Airport Director Page 39 of 194 3 ATTACHMENT A THE FOLLOWING IS A SUMMARY OF THE ACTUAL PROJECT COSTS: ITEM TOTAL COST SPONSOR'S SHARE OF COST FEDERAL SHARE OF COST STATE SHARE OF COST AMOUNT AMOUNT AMOUNT 1. PLANNING COST 2. LAND COST 3. CONSTRUCTION COST 4. ENGINEERING COST 5. ADMINISTRATIVE COST 6. MISCELLANEOUS 7. TOTAL ALL ACTUAL PROJECT COSTS Rules for Reimbursing Project Costs Prior to the Grant Execution Date: Unless specifically recommended by the Executive Director and approved in advance by the Commission, all project costs must be incurred after the execution date of the Airport Development or Aviation Education grant. Exceptions to this rule include:  Land or avigation easement acquisitions  Airfield facility emergencies not covered by insurance  Project exceptions identified in the relevant section of the FAA’s AIP Handbook This policy does not prohibit grant amendments for change orders that arise during construction, provided they are communicated with SCAC Airport Development staff in advance and approved by Commission. $95,000 $148,000 $243,000 $125,000 $48,750 $76,250 $71,750 $46,250 $118,000 Page 40 of 194 4 ATTACHMENT B DOCUMENTATION SUPPORT 1. Is this project a result of facility requirements determined by a Master Plan, Airport Layout Plan (ALP), the South Carolina Airport System Plan, or a revision to the ALP? ______Yes _______No If so, indicate FAA or SCAC approval date: 2. Does this project require environmental study / documentation under the National Environmental Policy Act of 1969 (NEPA)? Yes No 3. If so, please indicate the document type and its status:  Categorical Exclusion (CatEx)  Environmental Assessment (EA) _____________________________________________  Environmental Impact Statement (EIS) 4. Have all previous projects that involved federal and / or state funds been completed? Yes No (List all Open Federal and State Grants below) ________________________________________________________________________________ _________________________________________________________________________________ 5. If the State is unable to participate to the extent requested, what is the Sponsor's ability to fund a share greater than the State match? 6. Name of Regional Planning Council which airport is located: 7. Has Federal Application Form 424 been submitted to the Inter -agency Council on Public Transportation (State Clearinghouse) in accordance with Section 57-3-1050? ________Yes No 8. The following action has been taken by the local governing body to provide steps toward protective zoning of the airspace and land surrounding the airport. Describe actions by the Sponsor and governing body related to land use planning and zoning ordinances. 9. Anticipated date construction or planning / design project is to commence: Start Date: Ending Date: X NA X NA NA NA X None Lowcountry Council Of Governments NA November 2026 February 2027 See attached open grant spreadsheet Page 41 of 194 5 ATTACHMENTS  Open Grants and Project information and Justification Statement  Request-for-Aid / Project Sketch  Bid tabulation (Construction projects) or appropriate cost data  Pricing Sheet Professional Services Work Authorization / Task Order  Copy of signed Federal Application Form 424 (if this request is associated with an FAA AIP / AIG Grant)  Copy of executed Federal AIRPORT INFRASTRUCTURE GRANT AGREEMENT (if this request is associated with an FAA AIP / AIG Grant)  Earmarked Funds spending plan  Project Environmental Documentation (Categorical Exclusion – CatEx) if required (Revised: September 6, 2026) Page 42 of 194 Federal Grant # Description Grant ID Award Amount 64 Acquire Land for Development-28 Hunter Rd-Reimbursement 34500300642026 $ 1,358,322.00 63 Acquire Land for Development-26 Hunter Rd-Reimbursement 34500300632026 1,819,043.00 62 Taxiway F ROFA 34500300622025 306,022.00 61 Air Traffic Control Tower 34500300612025 300,000.00 60 Drainage Construction 34500300602025 1,390,569.00 59 SJBC Relocation EA (FAA AIP) 34500300592024 325,679.00 57 ALP Study (FAA BIL AIG) 34500300572024 825,757.00 56 ATP (BIL) 34500300562024 5,000,000.00 State Grant # Description Grant ID Award Amount SCAC 23-025 SCAC 23-025-Taxiway F Strengthening SCAC 23-025 $ 378,044.00 SCAC 24-025 Perform Terminal Improvement SCAC 24-025 750,000.00 SCAC 23-029 Terminal Construction Project SCAC 23-029 12,000,000.00 All Grants Summary - Updated 10/13/2026 Page 43 of 194 Hilton Head Island Airport State Entitlement Funding Request Project Title: Pedestrian Walkway and Bridge Development Project Description and Justification Hilton Head Island Airport (HXD) is experiencing increased demand for terminal parking due to continued growth in passenger enplanements, rental car operations, and airport staffing. The existing terminal parking lot has limited capacity to accommodate these competing demands. The airport is currently conducting a parking study to evaluate future parking expansion, improved accessibility, and long-term parking infrastructure needs. To address immediate parking constraints, the airport proposes constructing a pedestrian walkway and bridge connecting recently acquired property designated for supplemental parking to the existing terminal parking area. This connection will provide a safe, dedicated pedestrian route for airport employees and terminal tenants, allowing them to utilize supplemental parking while preserving existing terminal parking capacity for passengers and rental car operations. Upon completion of future parking improvements, the walkway will also accommodate airport customers, providing an additional pedestrian connection between the supplemental parking area and the terminal. The project will be delivered utilizing a design-build approach to streamline design and construction, improve project coordination, and expedite completion. The airport is requesting its allocated SCAC State Entitlement Funds to offset project costs and supplement available airport funding. This investment represents a practical infrastructure improvement that addresses current operational needs while supporting the airport's long-term parking development strategy and continued growth. Page 44 of 194 Approximate Stormwater Location SECURITY FENCE PEDESTRIAN WALKWAY AND BRIDGE TERMINAL MAIN ENTRANCE Page 45 of 194 Beaufort County, SC Airports Jon Rembold, Director PO Box 1228, Beaufort, SC 29902 EEVALUATION TABULATION RFP No. 082526 Pedestrian Walkway and Bridge Project at Hilton Head Island Airport RESPONSE DEADLINE: August 25, 2026 at 3:00 pm Report Generated: Wednesday, October 14, 2026 SELECTED VENDOR VENDOR RECOMMENDED BY THE EVALUATION PROCESS Vendor Location NIX CONSTRUCTION Hilton Head Island, SC VENDOR QUESTIONNAIRE PASS/FAIL Question Title Astra Group, LLC D Anderson Construction Company, Inc. Esposito Commercial Construction, LLC NIX CONSTRUCTION Reeves Young, LLC Proposer confirms the proposal is firm for a period of at least 90 days from the closing date for submission of proposal. Pass Pass Pass Pass Pass Please Provide Licenses and Certificate of Insurance. Pass Pass Pass Pass Pass Certification regarding Debarment, Suspension, Ineligibility, and Voluntary exclusion Pass Pass Pass Pass Pass Page 46 of 194 EVALUATION TABULATION RFP No. 082526 Pedestrian Walkway and Bridge Project at Hilton Head Island Airport EVALUATION TABULATION Request For Proposal - Pedestrian Walkway and Bridge Project at Hilton Head Island Airport Page 2 QQuestion Title AAstra Group, LLC DD Anderson Construction CCompany, Inc. EEsposito Commercial CConstruction, LLC NNIX CONSTRUCTION RReeves Young, LLC State whether your company has been involved in any litigation within the past five (5) years, arising out of your performance. Pass Pass Pass Pass Pass Explain fully any litigation involving performance. Pass No Response No Response No Response No Response Non-Segregated Facilities Pass Pass Pass Pass Pass Please upload any relevant certifications and/or licenses Pass No Response No Response Pass Pass Proposal Pass Pass Pass Pass Pass PPHASE 1 EVALUATORS Name Title Agreement Accepted On Marlene Myers Airports Business Manager Aug 26, 2026 8:20 AM Charles Neeson Airport Operations Chief Aug 31, 2026 2:43 PM Stephen Parry Deputy Airports Director Aug 26, 2026 2:49 PM EVALUATION CRITERIA Criteria Scoring Method Weight (Points) Qualifications & Relevant Experience Points Based 35 (35% of Total) Page 47 of 194 EVALUATION TABULATION RFP No. 082526 Pedestrian Walkway and Bridge Project at Hilton Head Island Airport EVALUATION TABULATION Request For Proposal - Pedestrian Walkway and Bridge Project at Hilton Head Island Airport Page 3 Description: Evaluation of the proposer's experience designing and constructing pedestrian bridges, walkways, or similar infrastructure projects. Consideration will be given to the firm's qualifications, experience on comparable projects, references, and demonstrated ability to successfully complete projects of similar scope and complexity. CCriteria SScoring Method WWeight (Points) Project Approach & Technical Proposal Points Based 30 (30% of Total) Description: Evaluation of the proposer's understanding of the project, proposed design approach, construction methodology, permitting strategy, project schedule, and ability to deliver a durable, safe, ADA-compliant, and low-maintenance pedestrian bridge and walkway. CCriteria SScoring Method WWeight (Points) Project Schedule Points Based 30 (30% of Total) Description: Evaluation of the proposed timeline for design, permitting, construction, and project completion, including the proposer's abil ity to complete the work efficiently while minimizing disruption to airport operations. CCriteria SScoring Method WWeight (Points) Value to the Airport Points Based 5 (5% of Total) Description: The airport seeks a solution that provides the overall best value to the airport. Value includes overall durability, warranty, aesthetics, low-maintenance materials, etc. Page 48 of 194 EVALUATION TABULATION RFP No. 082526 Pedestrian Walkway and Bridge Project at Hilton Head Island Airport EVALUATION TABULATION Request For Proposal - Pedestrian Walkway and Bridge Project at Hilton Head Island Airport Page 4 AAGGREGATE SCORES SUMMARY Vendor Marlene Myers Charles Neeson Stephen Parry Total Score (Max Score 100) NIX CONSTRUCTION 97 89 95 93.67 Reeves Young, LLC 96 86 92 91.33 D Anderson Construction Company, Inc. 84 88 89 87 Astra Group, LLC 93 67 88 82.67 Esposito Commercial Construction, LLC 85 79 81 81.67 VENDOR SCORES BY EVALUATION CRITERIA Vendor Qualifications & Relevant Experience Points Based 35 Points (35%) Project Approach & Technical Proposal Points Based 30 Points (30%) Project Schedule Points Based 30 Points (30%) Value to the Airport Points Based 5 Points (5%) Total Score (Max Score 100) NIX CONSTRUCTION 33.7 28 27 5 93.67 Reeves Young, LLC 32.3 26.7 28 4.3 91.33 D Anderson Construction Company, Inc. 29 27 27 4 87 Astra Group, LLC 32.7 23.7 22.7 3.7 82.67 Esposito Commercial Construction, LLC 29 26.3 22.3 4 81.67 Page 49 of 194 Nix Construction Company, Inc. 2 Corpus Christi, Suite 203 Hilton Head Island, SC 29928 (843) 341-2330 www.NixConstruction.com Gillian Murray September 25, 2026 Beaufort County Procurement 102 Industrial Village Rd #2 Beaufort, SC Re: HH Airport Pedestrian Bridge – Pricing & Scheduling Options Dear Gillian, Below are the formal pricing and schedule options for our Hilton Head Airport Pedestrian Bridge design-build proposal submitted last week. Pricing Option Phase 1 – Design Phase 2 – Construction Total Option 1 – Prefabricated Cascade truss bridge, composite deck and top-chord cladding, stainless cable rail $95,000 $218,000 $313,000 Option 2 – Nix site-built timber bridge, stainless cable rail $95,000 $148,000 $243,000 Phase 1 includes: Civil Engineering (Ward Edwards), Structural Engineering (29e6), Wetlands/endangered Species Assessments (Newkirk), Geotechnical (Whitaker), Corridor Survey (Atlas), and Nix Preconstruction Services. Phase 2 includes: Concrete Abutments, Grading And Asphalt Paving, Erosion Control, Electrical (Subcontractor And Fixtures), And General Conditions. Schedule We recognize the need for this project to complete before the Heritage Golf Tournament begins in April 2027, however, we are unable to confirm the permitting portion of the schedule until we are allowed to open clear communication with SC DES for Land Disturbance and Town of Hilton Head Island for Building Permit requirements. Upon approval, we will immediately seek direction from both jurisdictions to determine the fastest and most efficient way through this process. Scheduling Scenarios (From Notice to Proceed) Phase 1 – Design & Bldg Permit Phase 2 – Construction Total ‘Excluding’ SC DES land-disturbance 14 weeks 5 weeks 19 weeks ‘Including’ SC DES land-disturbance 25 weeks 7 weeks 32 weeks Page 50 of 194 Nix Construction Company, Inc. 2 Corpus Christi, Suite 203 Hilton Head Island, SC 29928 (843) 341-2330 www.NixConstruction.com Thank you for allowing us the opportunity to provide this proposal and we look forward to hearing from you soon. Sincerely, Eric Hoover, PE | President Eric@NixConstruction.com | Cell: 843-505-2455 Page 51 of 194 BEAUFORT COUNTY PUBLIC FACILITIES COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AN ORDINANCE AUTHORIZING THE ACCEPTANCE OF ROBIN WAY INTO COUNTY ROAD INVENTORY MEETING NAME AND DATE: Public Facilities Committee November 16, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: The following approaches may be considered regarding the future maintenance of Robin Way and the Robin Wood Special Purpose Tax District: • Acceptance of Robin Way into the County Road Inventory: Accept Robin Way into the County road inventory, with the County assuming responsibility for future roadway maintenance. • Appointment of Members to the Robin Wood Board of Commissioners: Appoint members to the board of commissioners to provide oversight and administration of the Robin Wood Special Purpose Tax District. PRESENTER INFORMATION: Bryan Bauer, Director of Engineering Kelsie Floyd, Right of Way Manager (10 min) ITEM BACKGROUND: The Robin Wood Special Purpose Tax District (SPTD) was established in 1992 through Ordinance 92/12 for the purpose of maintaining the roadway to include drainage and other public works incidents to road maintenance. The SPTD serves twenty-five lots within the Robin Wood Subdivision on Lady’s Island. Although assessments were historically levied and collected to support these maintenance activities, Beaufort County ceased collecting SPTD assessments around 2015. Despite the cessation of collections the district remains codified in Division 8 of the Beaufort County Code. A review of County records determined that Robin Way, the sole roadway providing access to all properties within the subdivision, is privately owned by the original subdivision developers. Beaufort County also owns the grassed detention area/open space depicted on Exhibit A of the proposed ordinance. The remaining two out of four recognized owners of the roadway have submitted a petition requesting that Robin Way and the associated drainage be accepted into the County road inventory for perpetual care. Additionally, of the twenty-five abutting property owners within the Robin Wood Subdivision, nineteen have signed a petition supporting Beaufort County’s acceptance of Robin Way into the County road maintenance system. The County’s 2025 Annual Comprehensive Financial Report identifies an unexpended balance of $22,002 attributable to the SPTD. To address the request from the roadway owners and signed petitions of support from residents of Robin Way, staff has prepared an ordinance for acceptance of Robin Way into Beaufort County’s road inventory. Page 52 of 194 FISCAL IMPACT: Future impacts could cost below: • Estimated potential cost for 20-year life cycle for resurfacing/maintenance ≈ $1.7 million (C-Funds account # 2343-30-0000-54500) APPROVAL HISTORY: Page 53 of 194 ORDINANCE NO. 2026/ AN ORDINANCE AUTHORIZING THE ACCEPTANCE OF ROBIN WAY INTO THE COUNTY ROAD INVENTORY WHEREAS, Beaufort County Council established the Robin Wood Special Purpose Tax District ("SPTD") in 1992 pursuant to Ordinance No. 92/12 for the purpose of maintaining the roadway within the Robin Wood Subdivision, including drainage and other public works incidental to road maintenance; and WHEREAS, the Robin Wood SPTD encompasses twenty-five (25) lots located within the Robin Wood Subdivision on Lady's Island in Beaufort County, as more particularly depicted on Exhibit "A" attached hereto and incorporated herein by reference; and WHEREAS, assessments were historically levied and collected for the Robin Wood SPTD to support roadway, drainage, and related maintenance activities, although Beaufort County ceased collecting assessments for the SPTD in or about 2015; and WHEREAS, notwithstanding the cessation of assessment collections, the SPTD was not formally repealed or dissolved by County Council and remains established pursuant to Section 66-476 of the Beaufort County Code; and WHEREAS, the Beaufort County 2025 Annual Comprehensive Financial Report identifies a balance of Twenty -Two Thousand Two Dollars ($22,002) attributable to the Robin Wood Special Purpose Tax District; and W HEREAS, through a review of Beaufort County records concerning the Robin Wood Subdivision, it was determined that Robin Way, the sole roadway within the Robin Wood Subdivision, is privately owned by the developers of the subdivision; and W HEREAS, as the owners of Robin Way, the developers have submitted a petition requesting that Robin Way be accepted into the County’s road inventory; and W HEREAS, two developers have executed the petition, one original developer is deceased, and another developer entity associated with the subdivision has been dissolved according to records of the South Carolina Secretary of State; and W HEREAS, the petition executed by the two developers is attached hereto as Exhibit “B” and incorporated herein by reference; and Page 54 of 194 WHEREAS, acceptance of Robin Way and the associated drainage system into the County's maintenance system will provide for the orderly transition of roadway and drainage maintenance responsibilities to Beaufort County and provide for the perpetual care and maintenance of the roadway; and WHEREAS, the County Council intends that the acceptance of Robin Way and the associated drainage system authorized by this Ordinance be considered separately from any future action concerning the dissolution of the Robin Wood Special Purpose Tax District. WHEREAS, County Council finds it appropriate to authorize the County Administrator to execute any necessary conveyance or related documents should the roads be determined to meet applicable County standards and acceptance criteria; and NOW, THEREFORE, BE IT ORDAINED that Beaufort County Council authorize the County Administrator to execute any and all documents associated with conveyance of Robin Way into the County Road Inventory, identified in attached Exhibit “A”. ADOPTED this _____ day of _______, 2026. COUNTY COUNCIL OF BEAUFORT COUNTY By: ______________________________________ Alice Howard, Chair ATTEST: ___________________________ Sarah W. Brock, Clerk to Council Third and Final Reading: Public Hearing: Second Reading: First Reading: Page 55 of 194 Exhibit "A" Page 56 of 194 Exhibit "B" Page 57 of 194 Page 58 of 194 Street Name: Robin Way Year 1 Linear Feet: 1110 Mobilization 150,000.00$ Width (Ft.): 24 Bonds & Insurance 27,500.00$ Square Feet: 26,640 Traffic Control 150,000.00$ Liquid Asphalt 15,954.40$ 4" Patching 14,800.00$ Surface D Surface C 16,280.00$ 2" Milling 29,600.00$ Rejuvenator Year 1 Total: 404,134.00$ Year 10 Mobilization 195,715.98$ Bonds & Insurance 35,881.26$ Traffic Control 195,715.98$ Liquid Asphalt 10,408.44$ 4" Patching 19,310.64$ Surface D 21,241.71$ Surface C 2" Milling Rejuvenator Year 10 Total: 478,274.00$ Year 20 Mobilization 263,025.91$ Bonds & Insurance 48,221.42$ Traffic Control 263,025.91$ Liquid Asphalt 13,988.07$ 4" Patching 25,951.89$ Surface D Surface C 85,641.24$ 2" Milling 51,903.78$ Rejuvenator Year 20 Total: 751,758.21$ Rejuvinator Cost (20 Year Life Cycle) $70,979.21 20 Year Life Cycle Estimated Costs TOTAL COST: $1,705,145.82 Engineering Cost Estimate Page 59 of 194 DIVISION 8. - ROBIN WOOD SPECIAL PURPOSE TAX DISTRICT Sec. 66-476. - Creation; boundaries. There is created a special purpose tax district to be known as the Robin Wood Special Purpose Tax District which shall include those 25 lots located at Robin Wood Subdivision, on Lady's Island in the county, in Robin Wood Subdivision shown on the plats in the office of the register of deeds. (Code 1982, § 7-101) Sec. 66-477. - Board of commissioners created, composition, terms of office. (a) There is established the Robin Wood Board of Commissioners, composed of five members or fewer to be appointed by the majority vote of the county council. Once 50 percent of the lots in the Robin Wood Subdivision are sold, each member of the board must be a record owner, either in whole or part, of a lot of land in Robin Wood Subdivision. (b) The term of office shall be for a period of four years and shall continue until successors are appointed and qualified. The board of commissioners shall follow t he guidelines as established in the county's template ordinance. (Code 1982, § 7-102) Sec. 66-478. - Compensation, officers and reports of board of commissioners. (a) The members of the board of commissioners of the Robin Wood Special Purpose Tax Distr ict shall serve without pay and shall annually file a report with the county council, not later than November 1 of each year, showing all activities and disbursements during the fiscal year. (b) The board shall select from among themselves a chairman, vi ce-chairman and secretary/treasurer who shall each serve for two years from the date of their respective appointments. All official documents shall be signed by the chairman and attested by the secretary, except that all disbursements shall be by the treasurer. (Code 1982, § 7-103) Sec. 66-479. - Powers and duties of board of commissioners. The board of commissioners of the Robin Wood Special Purpose Tax District shall have the following powers and duties: (1) Adopt an annual budget for the operation of the district and approve the expenditure of all funds; (2) May increase the assessment by majority vote of the board or by authority of this division should inflation exceed the passbook rate thereby requi ring additional funds to meet budgeted expenditures; or, if consolidation of lots occurs, the board shall ensure proper assessment on an original plat basis. If the board fails to provide for an assessment in any year, the county auditor and treasurer are directed to continue assessment as was established for the previous year; (3) Borrow money or accept donations under such terms and conditions as it may deem beneficial for the district, and use or expend the money or donations for the purposes of maintaining roads and improving drainage and other public works incident to road maintenance. The full faith and Page 60 of 194 taxing power of the tax district is irrevocably pledged for the payment of the indebtedness of the tax district; (4) Levy and assess each lot within the district on an equal, per -lot basis, through the county auditor and treasurer. The initial assessment shall be $27.50 per lot per year. Upon collection of the assessments, the board shall, after deducting its costs therefrom, disburse the money to any lender or other source of funding as may be necessary to pay any indebtedness by or on behalf of the district. Remaining funds shall be placed in an escrow account bearing the highest percentage rate available and under the protection of FDIC or FSLIC as a safeguard against inflation; (5) Enter into contracts for road resurfacing and/or maintenance and other public works incident to road resurfacing and/or maintenance; (6) Resurface and maintain roads, to include drainage and other public works incident to road resurfacing and maintenance in the tax district; and (7) Maintain roads and drainage easements in the tax district. (Code 1982, § 7-104) Sec. 66-480. - Duties of county auditor, treasurer and council. The county auditor and treasurer and county council are directed to levy and assess each lot within the Robin Wood Special Purpose Tax District and collect a tax therefrom, for such amounts as directed by the board of commissioners, with the first assessment being $27.50 per year per lot for the Robin Wood Special Purpose Tax District. (The formula for assessment shall be computed as follows: total linear footage of roadways times $0.70 per foot divided by the number of lots. The equation is based upon $34,000.00 per mile for a ten- year period.) All sums collected shall be credited to the district and delivered to such persons or entities as may be directed by the board. The board is responsible for notifying the county auditor of the assessment by March 15 of each calendar year. (Code 1982, § 7-105) Sec. 66-481. - Termination of district. The board of commissioners of the Robin Wood Special Purpose Tax District shall be allowed to petition the county to be dissolved upon presentation of sufficient documentation that the roads and drainage which have been maintained by the special purpose tax district have been accepted for perpetual care and maintenance by a governmental agency or duly incorporated homeowners' association. The county council may, by majority vote, determine whether to dissolve the tax district or continue its existence. Upon the tax district being dissolved, any funds belonging to the tax district shall be paid to the Robin Wood Homeowners' Association if formed; if not, excess shall escheat to the general fund of the county council. (Code 1982, § 7-106) Sec. 66-482. - Penalty for delinquency. When the fees and assessments or any portion of the fees and ass essments charged against any property or person in the Robin Wood Special Purpose Tax District for the current fiscal year are not paid for by January 16 or 30 days after the mailing of the fee and assessment notice, whichever occurs later, the county auditor shall add a penalty of three percent on the total amount of the fee assessment due, and the county treasurer shall collect the penalty. If the fees and/or assessments and penalty are not paid before the next February 2, an additional penalty of seven percent must be added by the county auditor Page 61 of 194 and collected by the county treasurer. If the fees, assessments, and penalty are not paid before the next March 17, an additional penalty of five percent must be added and collected by the county treasurer. If the fees, assessments, and penalties are not paid before or by March 17, the county treasurer shall issue his execution to the officer authorized and directed to collect delinquent taxes, assessments, and penalties, and costs for their collection as provided in this division and by the Code of Laws for South Carolina, 1976, as amended, for the collection of delinquent taxes. If the penalty dates required by this section fall on a Saturday, Sunday or legal holiday, the dates are extended to the end of the second business day immediately following which is not a Saturday, Sunday or legal holiday. (Code 1982, § 7-107) Secs. 66-483—66-510. - Reserved. Page 62 of 194 Page 63 of 194 Page 64 of 194 Page 65 of 194 Page 66 of 194 Page 67 of 194 Page 68 of 194 Page 69 of 194 Page 70 of 194 Page 71 of 194 Page 72 of 194 BEAUFORT COUNTY PUBLIC FACILITIES COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE NECESSARY DOCUMENTS AND PROVIDE FUNDING FOR THE PURCHASE OF THE 302 PARKER DRIVE FOR PUBLIC WORKS AND OTHER COUNTY OPERATIONS MEETING NAME AND DATE: Public Facilities Committee November 16, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Recommend that County Council approve the ordinance authorizing acquisition of 302 Parker Drive for use as a Public Works facility PRESENTER INFORMATION: Jared Fralix, Assistant County Administrator, 10 minutes ITEM BACKGROUND: Beaufort County is working to improve its Public Works facilities to support more efficient operations and consolidate functions within a coordinated campus. The Public Works facility was identified as a top priority in the 2021 Facilities Master Plan. Initial studies and design have already been initiated for a new facility at the Shanklin Road campus, and bond funding was secured in 2025 to fully fund the project. During design, the GlassWRX facility, located at 302 Parker Drive, became available on the market and was introduced as a purchase-and-renovate alternative to new construction. Based on investigation and due diligence completed to date, County staff and the design team have determined that this alternative is feasible and can meet the County’s needs while providing additional space, at an equivalent or lower overall project cost, and within a shorter delivery timeframe than the new-build option. The ordinance advances the Public Works improvement and consolidation effort by authorizing the County Administrator to execute the purchase agreement and closing documents within the Council-approved price and available appropriations, subject to satisfactory remaining due diligence and County Attorney approval as to legal form. FISCAL IMPACT: The purchase price is $X,XXX,XXX, in addition to closing costs. The funding source is the 2025 GO Bonds Fund (Fund 4013), specifically for Renovations to Buildings - 4013-80-1301-54420, which has an account balance of $25,000,000. APPROVAL HISTORY: Page 73 of 194 ORDINANCE 2027/_____ AN ORDINANCE AUTHORIZING THE COUNTY ADMINISTRATOR TO EXECUTE THE NECESSARY DOCUMENTS AND PROVIDE FUNDING FOR THE PURCHASE OF REAL PROPERTY AT 302 PARKER DRIVE FOR PUBLIC WORKS AND OTHER COUNTY OPERATIONS WHEREAS, Beaufort County (“County”) is a body politic and political subdivision of the State of South Carolina; and WHEREAS, under S.C. Code Ann. Sections 4-9-25 and 4-9-30, the County is empowered to act in matters involving the health, safety, and welfare of its citizens, and may acquire real property; and WHEREAS, the County desires to purchase the real property commonly known as the Glass WRX facility, owned by Glass WRX SC LLC, located at 302 Parker Drive, Beaufort County, South Carolina, identified with TMS No R120 025 000 0170 000, together with the building and improvements thereon, hereinafter referred to as the “Property”; and WHEREAS, the County has identified the Property as a potential facility for consolidation of Public Works and other County departments, including offices, operational support, equipment storage, warehousing, and related County functions; and WHEREAS, the County is conducting due diligence to evaluate the condition and suitability of the Property, including roof replacement, structural improvements associated with the proposed use, environmental conditions, title, and the cost of adapting the facility for County operations; and WHEREAS, the County agrees to purchase, and the Seller agrees to sell the Property for a purchase price of XXXX Dollars ($XXX.00) plus closing costs as provided in the purchase agreement; and WHEREAS, the funding for the purchase of the Property will be from the 2025 GO Bonds Fund (Fund 4013) – Renovations to Buildings, line item 4013-80-1301-54420; and WHEREAS, Beaufort County Council finds that acquisition of the Property, subject to the conditions stated herein, is in the best interest of the citizens and residents of Beaufort County. NOW, THEREFORE, BE IT ORDAINED by Beaufort County Council, duly assembled, authorizes the County Administrator to execute the necessary documents to purchase and to fund the purchase of the real property located at 302 Parker Drive as described above. DONE this ____ day of ___________ 2027. COUNTY COUNCIL OF BEAUFORT COUNTY BY: Alice Howard, Chairwoman ATTEST: Page 74 of 194 Sarah W. Brock, Clerk to Council Page 75 of 194 BEAUFORT COUNTY PUBLIC FACILITIES COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: A RESOLUTION ADOPTING BEAUFORT COUNTY ROAD CONSTRUCTION STANDARDS AND SPECIFICATIONS MEETING NAME AND DATE: Public Facilities Committee November 16, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval and referral to County Council for approval. PRESENTER INFORMATION: Bryan Bauer, PE, Director (5 minutes) ITEM BACKGROUND: Beaufort County has not had in-house road construction standards and specifications but has relied on the South Carolina Department of Transportation Construction Standards and Specifications for guidance in building roads and related structures. These standards and specifications are specific to Beaufort County and reflect the needs and circumstances encountered in the Lowcountry and that are specific to Beaufort County. FISCAL IMPACT: There is no fiscal impact to the County at this time. APPROVAL HISTORY: Page 76 of 194 BEAUFORT COUNTY STANDARDS & SPECIFICATIONS February 2025 Prepared by: Page 77 of 194 Beaufort County Standards & Specifications Page 2 Contents Acronym/Abbreviations .............................................................................................................................................................................................4 CHAPTER 1. INTRODUCTION ...................................................................................................................................................................................5 CHAPTER 2. ENCROACHMENT PERMITS ............................................................................................................................................................6 2.1 Encroachments and Work within Rights-of-Way and Drainage Easements ......................................................................6 CHAPTER 3. CONTRACTS ........................................................................................................................................................................................10 3.1 OPEN SECTION ...............................................................................................................................................................................................10 CHAPTER 4. DRIVEWAYS, SCHOOL ACCESS DESIGN, STREET INTERSECTIONS, AND SIGHT DISTANCE ...........................10 4.1 General Information .....................................................................................................................................................................................10 CHAPTER 5. SIDEWALKS, TRAILS, AND CURB & GUTTER ........................................................................................................................11 5.1 General Information .....................................................................................................................................................................................11 CHAPTER 6. TRAFFIC CONTROL DEVICES .......................................................................................................................................................12 6.1 Work Zone Traffic Control .........................................................................................................................................................................12 Refer to the SCDOT Standard Drawings 600 Specification and MUTCD for information. ......................................................12 a) Lane restrictions on Bluffton and Buckwalter Parkway from 9PM to 6AM. ...................................................................12 b) Follow all other lane restrictions per the SCDOT .......................................................................................................................12 6.2 Traffic Control Signage ................................................................................................................................................................................12 Refer to the SCDOT Standard Drawings 600 Specification and MUTCD for information. ......................................................12 6.3 Signals .................................................................................................................................................................................................................12 6.4 Pavement Markings ......................................................................................................................................................................................12 6.5 Traffic Calming ................................................................................................................................................................................................14 CHAPTER 7. TRAFFIC IMPACT ANALYSIS (TIA) ............................................................................................................................................14 CHAPTER 8. ROADSIDE ENCROACHMENTS ....................................................................................................................................................18 8.1 Refer to Chapter 9 of the ARMS Manual, latest edition and the following .............................................................................18 CHAPTER 9. DRAINAGE, ENVIRONMENTAL, AND EROSION CONTROL .............................................................................................19 9.1 Refer to the SOLOCO Manual for information. ...................................................................................................................................19 CHAPTER 10. BRIDGES, CULVERTS AND RETAINING WALLS ................................................................................................................19 10.1 Refer to the SCDOT Bridge Manual (latest edition) for information. ....................................................................................19 CHAPTER 11. CONSTRUCTION ..............................................................................................................................................................................19 11.1 General Information ...................................................................................................................................................................................19 11.2 Minor Rural Road Standards ..................................................................................................................................................................23 11.3 Secondary Rural Road Standards .........................................................................................................................................................23 11.4 Local Road Standards ................................................................................................................................................................................24 11.5 Collector Road Standards .........................................................................................................................................................................25 Page 78 of 194 Beaufort County Standards & Specifications Page 3 11.6 Arterial/Industrial Road Standards .....................................................................................................................................................27 11.7 Road Design ...................................................................................................................................................................................................29 11.8 Construction ..................................................................................................................................................................................................30 CHAPTER 12. LANDSCAPING GUIDELINES ......................................................................................................................................................34 12.1 Refer to the County Development Code for information. .......................................................................................................34 CHAPTER 13. DIRT ROADS ...............................................................................................................................................................................34 13.1 Refer to the County Dirt Road Standards for information. ........................................................................................................34 CHAPTER 14. RIGHTS OF WAY ........................................................................................................................................................................34 14.1 OPEN SECTION .............................................................................................................................................................................................34 Definitions ......................................................................................................................................................................................................................34 References ......................................................................................................................................................................................................................42 Page 79 of 194 Beaufort County Standards & Specifications Page 4 Acronym/Abbreviations Acronym/Abbreviation Definition AASHTO American Association of State Highway and Transportation Officials ADA Americans with Disabilities Act ADAAG Americans with Disabilities Act Accessibility Guidelines ARMS Access and Roadside Management Standards ASTM American Society for Testing Materials CDC County Development Code COUNTY Beaufort County Engineering Department HOA/POA Homeowners’ Association/Property Owners’ Association MLW Mean Low Water MUTCD Manual on Uniform Traffic Control Devices NAVD 88 North American Vertical Datum of 1988 OCRM Office of Ocean and Coastal Resource Management SCDES South Carolina Department of Environmental Services SCDOT South Carolina Department of Transportation SCDOT (SS) South Carolina Department of Transportation Standard Specifications for Highway Construction, latest edition SCDOT (SD) South Carolina Department of Transportation Standard Drawings, latest edition SOLOCO Southern Lowcountry Stormwater Design Manual TIA Traffic Impact Analysis USACE United States Army Corps of Engineers Page 80 of 194 Beaufort County Standards & Specifications Page 5 CHAPTER 1. INTRODUCTION 1.1 General Information This Road Construction Manual is intended to provide the minimum requirements for improvements or construction activities within the Beaufort County road system. Roads and associated systems must be designed and constructed in accordance with these standards and approved by the COUNTY in order for the County to accept into the County Road System and work in the County ROW, including: A. New construction B. Staged development of roadways C. Widenings D. Improvements to roadway appurtenances such as storm drainage systems E. Encroachments The Public Works Department/Engineering will approve all plans for the construction, upgrading, or encroachments into County right-of-way. The Contractor/Developer will be responsible for providing quality control testing to Beaufort County/Engineering departments. Construction of county roads and appurtenances will be subject to quality assurance inspections and acceptance by Beaufort County Public Works, Engineering, or their designee. 1.2 Hierarchy of Standards The Beaufort County Road Construction Manual is the principal document for county design and construction standards. This document also references several other manuals for further information. Requirements not explicitly provided herein shall fall back to the reference documents provided. All references to SCDOT specifications shall be the latest version available at the time of bid. Hierarchy of road standards: A. Contract Documents B. Beaufort County Road Construction Manual C. Most recent SCDOT standards, specifications, instructional bulletins, and memos including: i. Special Provisions ii. Plans iii. SCDOT Standard Drawings iv. Supplemental Technical Specifications v. Supplemental Specifications vi. Standard Specifications D. AASHTO and/or other applicable national highway standards 1.3 Design Year Requirements In general, roadways should be designed for the anticipated traffic density 20 years from the proposed date of construction. Current and future traffic data may be required to demonstrate the design capacity need. Long-range planning studies, future development, and zoning regulations should be considered in the design. Traffic impact analysis (TIA) may be required for the design. Page 81 of 194 Beaufort County Standards & Specifications Page 6 CHAPTER 2. ENCROACHMENT PERMITS 2.1 Encroachments and Work within Rights-of-Way and Drainage Easements A. Introduction. This section is intended to provide a general guideline for the design and construction of structures that may be located within right-of-way or drainage easements that have been, or will be, accepted into the Beaufort County maintenance system. No work shall be commenced until an encroachment permit for such work has been obtained from the COUNTY. No roadways will be taken into the County system unless approved by the County Council. B. Encroachment Permits - General. Any permanent or temporary construction or placement of any structure or object (driveway, sign, fence, utility, etc.) within a Beaufort County drainage easement or road right-of-way must receive an encroachment permit from the Engineering Department prior to the beginning of work or emplacement of structure or object. All work within publicly owned or maintained right-of-way and/or easements must comply with the requirements provided in this chapter, the encroachment permit application package, the SCDOT ARMS manual, and/or SCDOT’s Policy for Accommodating Utilities on Highway Rights-of-Way. Any encroachment shall not impede sight distance of the traveling public. 1. The encroaching entity will submit all permit requests on the Beaufort County APPLICATION FOR ENCROACHMENT PERMIT FORM for review. Permit applications will be reviewed and issued with comments, approved, or denied by the COUNTY within 30 days of receipt. Applications are not automatically approved after 30 days if no comments are received. 2. If it is the opinion of Beaufort County, SCDOT , or any other public agency, that it is necessary to relocate or remove the encroachment, or any part thereof, due to the improvement, relocation, or widening of the road, street, or drainage system, or for any other reason, such moving or removing will be done only at the request of the COUNTY at the expense of the permittee. 3. The COUNTY may require the removal of unpermitted encroachments (driveways, piping of any kind, physical structures, etc.). The County may remove the object, at the property owner’s expense, sooner if the object is deemed hazardous to the public and causes unsafe conditions. The Landowner/Developer will be notified of the illegal encroachment by letter and will be given 30 days to remove the unpermitted encroachment or to obtain a permit. Should the encroachment not be removed or permitted within this timeframe, Beaufort County, or an agent of the County, will remove the encroachment at the expense of the Landowner/Developer. 4. The Beaufort County Engineering office shall be notified no later than 24 hours prior to the commencement of work. Failure to do so shall be considered sufficient grounds to revoke the permit. Work undertaken without a valid permit may be subject to legal action by the county attorney under the applicable statutes of the County. 5. Adequate provisions shall be made for the protection of the traveling public at all times when performing work under an encroachment permit. During the progress of the work, all necessary detours, barricades, warning signs, and flagmen will be provided by, and at the expense of, the permittee to ensure safety. Submit a Traffic Control Plan as described in the SCDOT (SS) Section 601.1.2 to be approved by the COUNTY. Traffic control operations shall be supervised by a competent person. 6. Restoration work shall be immediately accomplished to return the road and/or drainage system to prior Page 82 of 194 Beaufort County Standards & Specifications Page 7 condition or better. The liability of the permittee will not be released until all work is inspected and approved by the COUNTY. 7. Any proposed infrastructure encroachment into a public easement which crosses a parcel boundary shall be accompanied with written permission from affected landowner(s). 8. During construction, and prior to County acceptance, the applicant shall be responsible for the maintenance of the road and all associated drainage for a one (1) year warranty period. 9. The permittee will be responsible for the maintenance associated with the permitted facility in perpetuity. The permittee shall follow all necessary procedures to protect Beaufort County facilities and the traveling public. Failure to do so may result in permit revocation. 10. The permittee will be responsible for coordinating work schedules, traffic impacts, and property access changes with the businesses and/or homeowners impacted by the work. C. Types of Encroachments within Public Rights-of-Way and Easements. 1. Driveway encroachment permit applications shall be designed in accordance with the SCDOT ARMS Manual unless otherwise approved. Residential driveway widths shall be limited to a minimum 12 feet and maximum 20 feet. Refer to the encroachment permit for driveway widths. Minimum driveway radii shall be 5 feet. Shared driveways are allowed for commercial and residential use. Widths, radii, or curb cut dimensions for shared driveways will be reviewed and approved on a site-specific basis. Driveway culverts shall be a minimum diameter of 15 inches and a minimum of 20 feet in length, or additional length necessary to maintain a 2:1 fill slope over the pipe. The permittee will be required to verify the culvert is designed sufficient to not negatively impact the flow channel 300 feet upstream and downstream of the encroachment or to the nearest culverts in each direction. Driveway aprons shall be at least equal to the type of surface with which it is being connected (Pavement, rock, or earth). The permittee may be required to provide as-built information for the driveway. Commercial driveways shall be designed sufficient for the largest class vehicle use and will be reviewed on a site-specific basis. 2. The piping of open conveyances shall be sized appropriately to accommodate the drainage of upstream and downstream flow. A minimum of one 4-foot by 4-foot junction box or inlet shall be required to accept Roadway sheet flow, though more may be required at the discretion of the COUNTY STORMWATER DEPARTMENT. Request for piping of roadside ditches may be rejected, at the discretion of the COUNTY STORMWATER DEPARTMENT or removal of sprinklers will be at the cost of the property owner. 3. The installation of physical structures (including, but not limited to, fences, trees, bridges, piping, landscaping beds, roads, and driveways) shall require encroachment permits. Beaufort County Engineering Department reserves the right to deny encroachment permit applications. 4. Landscaping and Planting. Installation of landscaping and planting shall require encroachment permits. Each application will be reviewed for adequate site triangles, line-of-sight, etc. on a site-specific basis by the COUNTY. 5. Subdivision Entrance Signs. Subdivision name signs at entrances to developments must be approved as part of the development permitting and an encroachment permit. Subdivision name signs will be located outside the road right-of-way except those signs located within a roadway median. All signs shall be located outside of horizontal sight distance. Such signs, foundations for future signs, and conduit for electrification of signs shall be shown on the construction plans and an encroachment permit obtained prior to construction. Approval of the plans by the COUNTY does not imply or guarantee the approval of other entities. 6. Utilities. The proposed concept for the location of all underground utility lines, including water, sanitary Page 83 of 194 Beaufort County Standards & Specifications Page 8 sewer, gas, electrical, communication facilities, shall be shown utilizing typical roadway plans, cross sections, and profiles. Non-typical locations, such as areas around trees, shall be shown in sufficient detail for review and approval. Utility lines shall be located so that they will not interfere with the proper functioning of the drainage system. For roads where a curb and gutter section is used, underground utility main lines should be a minimum of 5 feet behind the back of the curb. For roads where the swale ditch section is used, utility main lines should be installed not less than 15 feet from the centerline of the roadway and not less than 5 feet from the edge of pavement. a. The minimum allowable cover over the top of the utility encroachment or other apparatus should be 36 inches. Deviations to the 36 inches cover requirement must be presented in the cross-section format along with a written justification and submitted to the COUNTY for approval. b. No work on utility lines within the limits of the proposed publicly maintained right-of-way shall commence until the roadway plans showing the proposed locations of the utility lines have been approved. In case any utility location is not provided, the developer shall be responsible for notifying the utility that installation work within the proposed publicly- maintained right-of-way or drainage easement will require the approval of the COUNTY. c. Unapproved utility work within the right-of-way or drainage easement will result in an immediate suspension of work until such time as the utility plans have been reviewed and approved by the COUNTY. d. Trenches or open cuts within the road right-of-way for utilities and/or other purposes shall be properly backfilled with select material, mechanically compacted in 6-inch layers or flowable fill. Backfill material shall be compacted to 95 percent of maximum density by method ASTM D 1557 Method A. Temporary patching shall be with a crusher run material or as approved by COUNTY. Open cuts under pavement or areas to be paved shall be backfilled with flowable fill to the top of subgrade elevation. The remaining depth to finish grade must be placed back to match the existing pavement section, including base course material, or better. Open cuts under paved roads will require the removal of an additional 1 foot of asphalt beyond the open cut in both directions to allow for a clean asphalt joint. An open cut must be paved back to finish grade or match existing pavement section within 7 days of excavation unless approved by COUNTY Failure to do so will result in permit revocation. e. Flowable Fill. The use of flowable fill is at the discretion of the COUNTY. Refer to Section 210 of the SCDOT SS for guidance on the use of Flowable Fill. All flowable fill must be excavatable. f. Steel Plates. Use steel plates within the travel way when backfill operations of an excavation in the travel way, whether transverse or longitudinal, cannot be properly completed within a workday. Steel plate bridging will be required to preserve unobstructed traffic flow within the roadways. In such instances the following applies: i. Steel plates must be able to withstand H-20 traffic loading without any movement. ii. Steel plates shall be fabricated to meet ASTM A36 steel requirements. iii. When two or more plates are used, the plates shall not be stacked on top of each other, and vertical movement should be reduced as much as practical. iv. Steel plates shall be installed to resist bending, vibrations, etc., under traffic loads and shall be anchored securely to prevent movement. If these conditions are not met, the applicant will be required to backfill and pave the excavation daily or use alternative methods such as “Plate Locks” and/or ramps which are designed to secure the plates with minimum noise and vibration. The use of “asphalt patch ramps” are not permitted. Page 84 of 194 Beaufort County Standards & Specifications Page 9 v. There shall be a minimum 12-inch overlap of the steel plate onto the surrounding roadway. vi. A “Steel Plate Ahead” sign that meets the MUTCD standards shall be used to warn the traveling public. vii. All steel plates shall be properly marked with the contractor’s name. viii. The use of steel plates is at the discretion of the COUNTY. g. Where utilities have been designed to be placed at a depth or location such that the repair of that utility would adversely impact the flow of vehicular traffic, the design professional shall either address such concerns to the satisfaction of the COUNTY or redesign the utility layout. At grade or above gradeinfrastructure shall not be placed within the travel way or drainage path unless specifically approved by the encroachment permit. The landowner/developer/utility provider may be required to obtain additional right-of-way or easements to accommodate the proposed utility. h. Utilities crossing under the roadway shall be at an angle of not more than 30 degrees from the perpendicular to the road. All pipe to be sleeved or ductile. i. The jetting or uncontrolled tunneling of utility lines under a paved road is not permitted. The cutting of the pavement is not permitted except under extreme circumstances and only as permitted by the COUNTY. j. Proposed street lighting facilities (poles, fixtures, bulbs, lumens, etc.) shall be shown on the roadway construction plans submitted to the Beaufort County Engineering Department for approval. k. The COUNTY will only permit utilities other than drainage facilities within drainage easements upon specific written authorization. l. Encroachments of storm drainage pipes greater than 15 inches will require outfall protection with side slope stabilization for the full width of the ditch, swale, or canal (top of bank to top of bank), and upstream and downstream of the encroachment for a minimum of 15 feet or greater in each direction, dependent on-site conditions, and velocity of stormwater. D. Zoning Permits. The COUNTY will review encroachment permit applications for signs and structures within public right-of-way for compliance with this ordinance. No encroachment permits for signs, other than traffic control signs, will be issued without the written approval of the COUNTY. Issuance of a zoning permit does not ensure approval by the COUNTY. E. Restoration of Infrastructure. Restoration is intended to aid proper county road maintenance. Any entity performing work within County right-of-way that will damage an existing road, drainage system, or structure must ensure that the systems will be returned to a condition equal to or better than that prior to proposed/current construction work. 1. Any utility, public agency, or other entity or person performing work in a county right-of-way or easement must obtain an encroachment permit prior to beginning any construction. The applicant shall furnish information on the encroachment permit application detailing all work. Details on restoration of all disturbed areas or utilities will also be provided on the encroachment permit application. 2. A precondition assessment shall be performed for access roads by contractor to help repair damage to the roadway for 500 ft each direction. 3. Restoration work will return the road, drainage system, and any impacted utilities to prior condition or better. The liability of the permittee will not be released until all work is inspected and approved by the Page 85 of 194 Beaufort County Standards & Specifications Page 10 COUNTY. F. Encroachment Permit Checklist. 1. Below are the minimum guidelines for submitting exhibits to Beaufort County: A. All permits must be signed and dated and include: - Name of road - Width of right-of-way - Width of pavement - Distance to centerline of nearest intersection - North arrow - Location map - Written description of work to be performed - Drawing scale - Pavement repair details B. Utility Permits Must Also Include: - Traffic Control Plan - Boring & trenching details - Details of pipes & sizes - Depth below existing ground of utilities - Utilities shown at a minimum of 5 feet from edge of pavement distance from edge of pavement to utility - Existing easements Shown - Curbing detail (if curbing is disturbed) - Sidewalk location and detail (if sidewalk is disturbed) C. Road Tie-In Permits Must Also Include: - Speed limit - Sight distance - Sight triangles - Road or driveway profile - Typical pavement section - Angle of intersection - Drainage flow direction - Distance between driveways - Catch basin/ditch section details (drainage plan) - Adjacent driveways/roads CHAPTER 3. CONTRACTS 3.1 OPEN SECTION Page 86 of 194 Beaufort County Standards & Specifications Page 11 CHAPTER 4. DRIVEWAYS, SCHOOL ACCESS DESIGN, STREET INTERSECTIONS, AND SIGHT DISTANCE 4.1 General Information A. Driveways 1. Residential a. Refer to Chapter 2.1, Section C of this manual. b. Refer to Encroachment Permit. c. Refer to SCDOT (SD), 720-405, 720-410, and 720-415. 2. Commercial a. Refer to Chapter 2.1, Section C of this manual. b. Refer to Chapter 3 of the ARMS Manual, latest edition. c. Refer to SCDOT (SD), 720-405, 720-410, and 720-415. B. School Access Design 1. Refer to Chapter 4 of the ARMS Manual, latest edition. C. Street Intersections 1. Refer to Chapter 5 of the ARMS Manual, latest edition. D. Sight Distance 1. Refer to Chapter 7 of the ARMS Manual, latest edition. CHAPTER 5. SIDEWALKS, TRAILS, AND CURB & GUTTER 5.1 General Information A. Sidewalks, Multiuse Paths, and Trails. Sidewalks shall be concrete unless approved by COUNTY. When placed within the public right-of-way, pedestrian ways shall be constructed as specified below: 1. Asphalt Sidewalk. An asphalt sidewalk shall have a minimum asphalt thickness of 1-1/2 inches and a minimum stone base course thickness of four (4) inches. The minimum width for pedestrian ways shall be five (5) feet. All work, materials, methods, and equipment, unless specified otherwise herein, shall be in accordance with the SCDOT (SS). For additional ADA requirements see Chapter 5.1 section 3, ADA Requirements. 2. Concrete Sidewalk. A concrete sidewalk shall have a minimum thickness of four (4) inches except at driveways where the minimum thickness shall be six (6) inches. Concrete shall have a minimum 28-day compressive strength of 3,000 psi. Contraction joints shall be placed at intervals of not more than ten Page 87 of 194 Beaufort County Standards & Specifications Page 12 (10) feet and transverse expansion joints shall be placed at intervals of not more than fifty (50) feet. The minimum width for pedestrian ways shall be six (6) feet. All work, materials, methods, and equipment, unless specified otherwise herein, shall be in accordance with the SCDOT (SS) and SCDOT (SD). 3. ADA Requirements. All pedestrian ways shall be in accordance with the latest edition of the Americans with Disabilities Act Accessibility Guidelines (ADAAG) and the SCDOT (SS). B. Crosswalks. Any deviation from Standards shall require approval by COUNTY and meet the minimum ADA requirements. C. Curb and Gutter. 1. Types of Curb and Gutter a. Concrete Curb and Gutter. Either upright curb and gutter or roll curb and gutter may be used (see details in SCDOT (SS), Section 720). If upright curb and gutter is utilized, driveway entrances for subdivision lots shall be shown on the construction plans and constructed as part of the development. The distance between construction joints and expansion joints, unless specified otherwise herein, shall be in accordance with the SCDOT (SS). b. Asphalt Curb and Gutter. Asphalt curb and gutter sections shall be submitted for approval. All work, materials, methods, and equipment, unless specified otherwise herein, shall be in accordance with the SCDOT (SS). 2. ADA Requirements. All curb construction shall be in accordance with the latest edition of the Americans with Disabilities Act Accessibility Guidelines (ADAAG) and the SCDOT (SS). CHAPTER 6. TRAFFIC CONTROL DEVICES 6.1 Work Zone Traffic Control Refer to the SCDOT Standard Drawings 600 Specification and MUTCD for information. a) Lane restrictions on Bluffton and Buckwalter Parkway from 9PM to 6AM. b) Follow all other lane restrictions per the SCDOT. 6.2 Traffic Control Signage Refer to the SCDOT Standard Drawings 600 Specification and MUTCD for information. 6.3 Signals SEE APPENDIX "A" 6.4 Pavement Markings It is the intent of Beaufort County to incorporate these guidelines on all future roadway resurfacing and roadway construction projects, unless otherwise noted. Stop bars shall be installed on roads where not currently present as budget permits. Materials: 1. All materials and installation methods shall conform to South Carolina Department of Transportation (SCDOT) Standard Specifications for Highway Construction, most recent edition, and all SCDOT supplemental and technical specifications, unless otherwise detailed by County Engineering staff. Placement Guidelines: Page 88 of 194 Beaufort County Standards & Specifications Page 13 Consider the following guidelines for installation of pavement markings. 1. All Roads: The following apply to all County maintained roads: • Installed Raised Pavement Markers (RPM) on all paved County maintained roads. Spacing of RPMs shall be forty (40) feet longitudinally, unless otherwise specified. • Do not include edge lines on streets with curb and gutters. • For all roads that have a paved shoulder, include an edge line at the edge of the travel way, leaving the paved shoulder beyond the edge line. • Stop bars shall be installed on all County maintained roadways. • All longitudinal striping shall be four (4) inch width unless otherwise specified. 2. Primary Roads: • All primary roads shall have both center and edge line pavement markings. Do not include edge lines on roads with curb and gutter. • Longitudinal striping shall be six (6) inch width on routes with speeds exceeding forty-five (45) miles per hour (mph) and with Average Daily Traffic (ADT) of ten thousand (10,000) vehicles or greater. 3. Secondary Roads: • Include centerline and edge line pavement markings on all rural secondary roads that are at least twenty (20) feet wide and have and ADT of five hundred (500) or greater. • Centerline pavement markings shall be applied on all roads with a speed limit greater than thirty (30) mph. • Centerline and edge line markings may be excluded from subdivision and neighborhood streets, if speed limits are below thirty (30) mph. Other Markings: 1. All other pavement markings, including but not limited to, symbols, bike lanes, and other scenarios not developed in this standard shall be approved by the COUNTY and shall meet all standards and specifications set forth by SCDOT and the Manual Uniform on Traffic Control Devices (MUTCD) most recent edition. Cross Walks: 1. All Roads: The following applies to all County Maintained Roads with signalized intersections. a. The design of crosswalks shall be in accordance with the SCOT Specific details and MUTCD standards. b. If a local government would like to stripe and maintain a crosswalk of a different pattern, it must at a minimum comply with MUTCD standards: ▪ All striping shall be white. ▪ Solid white lines shall mark all crosswalks. Crosswalk lines shall not be less than 6 inches or greater than 24 inches in width. ▪ Either transverse or parallel lines shall be used. 2. Primary Roads: • At the intersection of 4 or more lane roadways where the speed is equal to or greater than 45 mph and the volume of traffic is equal to or greater than 15,000 ADT, then a continental-styled high visibility crosswalk is to be implemented on all legs of the intersection, unless prohibited due to unfavorable pedestrian volumes, grades, and sight distance (per the SCDOT ARMS Manual). The continental crosswalk should consist of a series of wide stripes parallel to the curb for the length of the crossing. When applicable, continental crosswalks should be designed with the stripes placed to avoid wheel paths, which can reduce long-term maintenance needs. 3. Secondary Roads: Page 89 of 194 Beaufort County Standards & Specifications Page 14 • At the intersection of 2 or more lane roadways where the speed is equal to or greater than 35 mph and the volume of traffic is equal to or greater than 8,000 ADT, then a standard or ladder- styled high visibility crosswalk is to be implemented on all legs of the intersection, unless prohibited due to unfavorable pedestrian volumes, grades, and sight distance (per the SCDOT ARMS Manual). The ladder crosswalk should consist of two 12-inch-wide white retro- reflective thermoplastic stripes and a series of wide stripes parallel to the curb for the length of the crossing. 4. Other Roads: • At the intersection of 2 or more lane roadways where the speed is no more than 30 mph and the volume of traffic is equal to or greater than 3,000 ADT, then a standard - style high visibility crosswalk is to be implemented on all legs of the intersection, unless prohibited due to unfavorable pedestrian volumes, grades, and sight distance (per the SCDOT ARMS Manual). The standard crosswalk should consist of two 12-inch-wide white retro-reflective thermoplastic stripes that delineate the sides of the pedestrian walking area. The stripes should be transverse to the direction of vehicle travel and parallel to the direction of pedestrian travel. 5. Colored Pavements: • Further, FHWA Ruling 3(09)-25I – Application of Colored Pavements – clearly describes acceptable and unacceptable color and pattern treatments for crosswalks. Local governments should refer to this ruling when considering designs that differ MUTCD standards. Beaufort County will assess any variations in local government crosswalk design including graphics or elaborate designs. *Note: Crosswalks are required at schools, parks, senior centers, transit stops, hospitals, campuses, and major public buildings regardless of speed and volume. A crosswalk study will be required at all unsignalized intersections before implementation, which should include vehicular volumes and speeds, roadway width and configuration, stopping sight distance, distance to the next controlled crossing, nighttime visibility, grade, and pedestrian volumes. Roadways Maintained by other Jurisdictions: It is the intent of Beaufort County to have a distinct striping plan utilized throughout the County. All roads falling within the County shall utilize this plan as detailed below: 1. The County will incorporate this plan, at its own expense, on all SCDOT & municipally maintained roadways when resurfacing or undertaking projects on routes not maintained by the County, if approved by the SCDOT or municipality. 2. This plan will be utilized if a roadway falls within a municipality but is maintained by the County/SCDOT. If the municipality would like markings or signage to adhere to a different standard (such as a town/city design standard), then the municipality will be responsible for funding the difference in construction costs between the standards. 6.5 Traffic Calming Refer to the Beaufort County Traffic Calming Guidelines, latest edition. CHAPTER 7. TRAFFIC IMPACT ANALYSIS (TIA) Page 90 of 194 Beaufort County Standards & Specifications Page 15 7.1 Purpose, and Intent, and Applicability This section of the ordinance establishes requirements for the analysis and evaluation of traffic impacts associated with development. A traffic impact analysis (TIA) will be required with applications for rezoning, preliminary plans, single-site development site plans, and encroachment permit applications. The following provides the guidelines for the preparation of these TIAs. The estimate of the number of trips generated by proposed developments will be based on the Institute of Transportation Engineers (ITE) Trip Generation, 11th Edition, or latest edition at time of study. Other trip generation data collected locally may be used where approved by the COUNTY. A. A traffic impact analysis (TIA) study will be required for new developments when the proposed development is projected to generate 50 or more trips during the peak hour of the traffic generator or the peak hour of the adjacent street traffic (7:00 - 9:00 a.m. or 4:00 - 6:00 p.m.). Proposed developments that do not meet this threshold may also be required to complete a traffic study as determined by the COUNTY. B. A traffic impact study will be required for a change or expansion at an existing site that results in an expected increase of 50 or more trips during the peak hour of the traffic generator or the peak hour of the adjacent street traffic (7:00 - 9:00 a.m. or 4:00 - 6:00 p.m.), or if the COUNTY determines that the change or expansion of the existing site will have significant impact at the existing access points, proposed access points, or surrounding intersections. C. A driveway traffic analysis may be required if trip generation is projected to be below the thresholds above at the request of the COUNTY. 7.2 TIA Requirements The following criteria shall be used to evaluate the findings of traffic impact analyses: 1. A traffic impact analysis study shall be prepared in accordance with SCDOT standards. 2. Level of service (LOS). The results of the TIA shall inform and contemplate the traffic mitigation measures necessary to ensure that the minimum service standards established herein are met during the required planning horizon. The Future No-Build conditions LOS for study area intersections, measured using the latest Transportation Research Board's Highway Capacity Manual standards for LOS calculation, shall be maintained in the Future Build conditions. If a reduction in the LOS is unavoidable, required improvements shall be identified to most effectively and practically minimize the reduction in operational LOS. Post-development operational LOS shall meet a LOS D goal for study area intersections. If LOS for an unsignalized intersection is found to be LOS E or F, mitigation measures should be reviewed, and discussion included in the report on potential side street queuing. 3. Number of access points. The number and spacing of access points shall comply with applicable standards set forth in the SCDOT Access and Roadside Management Standards (ARMS manual) and any designated Access Management Plans in the County’s Community Development Code or any other access management planning in development. This shall be coordinated with Beaufort County staff during the development of the TIA. 7.3 Traffic Study Preparation and/or Review At the sole expense of the Applicant, the TIA shall be prepared by a traffic engineer licensed in South Carolina who is experienced in the conduct of traffic analysis, and whom is one of the consultants previously selected for On-Call traffic engineering services by the County. Applicant shall coordinate with Beaufort County staff on details Page 91 of 194 Beaufort County Standards & Specifications Page 16 of the project to develop the scope of services for the TIA. 1. The Applicant shall provide the following information to County staff as part of the Applicant’s request for a TIA: a. Total acreage for the project. b. Description of the type of use(s) proposed and existing use or last known use. c. Concept or sketch plan showing total square footage for the buildings (existing and proposed), the number and type of dwelling units proposed, square footages floor area by land use type, planned point(s) of access, proposed roads, internal accesses, bike/pedestrian facilities, and any other transportation infrastructure or facilities, and parking areas. d. Projected buildout year when the site will be substantially occupied. e. The project’s civil engineer shall design on-site vehicle circulation, queuing, and parking patterns so as not to interfere with the flow of traffic on any public street, including intersections and meets all SCDOT and Beaufort County driveway standards including sight distance requirements. The project’s civil engineer shall ensure that no blocking of internal driveways shall occur. Cross access shall be required between parcels, where applicable. f. The Applicant shall provide a site plan with driveway sight distance triangles, edge-to- edge distance to adjacent driveways and intersections, and a demonstration that the number of driveways proposed is the fewest necessary that provide safe and efficient traffic operations. g. Documentation of any pre-coordination with SCDOT regarding access location(s). 2. After determination of the scope of services, the County’s On-Call consultant shall provide a cost estimate of such services to the COUNTY for review. An invoice shall be sent to the Applicant who shall provide payment in an amount equal to the estimated cost to the COUNTY. The notice to proceed will be provided by staff to the County’s On-Call consultant once the payment is received. 3. Additional fees for services may be required if the Applicant substantially amends an application and/or the consultant's appearance is requested at meetings beyond what was anticipated in the initial scope of services. The Applicant shall remit payment to the COUNTY for these costs before the services are provided. 7.4 TIA Required Components The TIA shall include the following components unless otherwise coordinated with the COUNTY. A. Existing conditions. Description of existing traffic conditions, including existing peak-hour traffic volumes adjacent to the site and LOS for study area intersections. Existing traffic signal timings should be used. Morning (a.m.) and evening (p.m.) peak hour turning movement counts from 7:00 a.m. to 9:00 a.m. and from 4:00 p.m. to 6:00 p.m., respectively, taken on a Tuesday, Wednesday, or Thursday when area K-12 public and private schools are in session shall be used. Other peak periods may need to be counted, as determined by the COUNTY, based on the specifics of the project. This would be determined during the TIA scoping process. Seasonal data collection or Page 92 of 194 Beaufort County Standards & Specifications Page 17 conversion to represent seasonal conditions may be requested for TIAs on Hilton Head Island. Existing counts may be used if taken within 12 months of the submittal of the TIA, unless authorized by the COUNTY. Other information that may be required to be collected may include, but is not limited to, crash data, stopping sight distances, and 50th and 85th percentile speeds. B. Proposed land use. As provided by the Applicant, a description of the current and proposed land use including characteristics such as the number and type of dwelling units, square footage of the floor area, accompanied with a project site plan (with buildings identified as to proposed use) and a schedule for construction of the development and any proposed development stages should also be included in the TIA. C. Estimate of trip generation. As noted previously, the projected trips for the development should be based on the most recent edition of the ITE Trip Generation Manual. Local trip generation studies may be conducted if previously approved by the COUNTY. A table should be provided in the report outlining the categories and quantities of land uses, with the corresponding trip generation rates or equations, and the resulting number of trips. For large developments with multiple phases, the table should be divided based on the trip generation for each phase. Any reductions due to internal trip capture (to a maximum of 20 percent) and pass-by trips (to a maximum of 10 percent of adjacent street traffic), and modal split should be justified and documented. All trip generation and trip reduction calculations and supporting documentation shall be included in the report appendix. Internal capture and pass-by should be based on ITE and National Cooperative Highway Research Program (NCHRP) methodologies. For developments that do not have a final site plan, the highest and best use of the parcel shall be used in the TIA. D. Trip distribution and traffic assignment. The trip distribution of the projected trip generation to the adjacent street network and study area intersections shall be included in the report and the basis should be explained. E. Internal circulation, queuing and parking patterns. The TIA will generally review the on-site vehicle circulation, queuing, and parking patterns to confirm that the flow of traffic is not impeded on any public street or surrounding intersections and the driveway design meets SCDOT and Beaufort County driveway standards for driveway width, throat, and sight distance requirements and cross access is included on the plan if applicable. F. Planning horizon. The TIA shall be performed for the year the development will be substantially occupied. The buildout year for the development shall be provided by the Applicant. If the development is planned to be phased, the phase year shall be provided by the Applicant. G. Growth and Approved developments. In addition to the non-specific yearly growth, approved yet not constructed developments within the vicinity of the site shall be included in the Future No-Build and Build conditions. The approved developments to include in the study shall be coordinated with COUNTY and SCDOT staff. H. Future Year Analysis and Identification of Improvements. A capacity analysis should be performed at each of the intersections and driveways (signalized and unsignalized) in the study area. Page 93 of 194 Beaufort County Standards & Specifications Page 18 Intersection analysis shall include LOS determination for the overall intersection or approach depending on the type of control at the intersection in the No-Build (without the development) and Build (with the development) conditions based on the latest HCM methodologies. If the capacity analysis indicates that an intersection does not meet the LOS standard, a mitigation analysis will be conducted to identify the improvements needed to meet the LOS standard. If the capacity analysis indicates that an intersection does not meet the LOS standard for No-Build conditions, a mitigation analysis for Build conditions will be conducted to determine the improvements needed to be completed for the project to accomplish the LOS and delay in No-Build conditions or better. I. Access management standards. The report shall include the Applicant provided site plan showing and description of the proposed access points and compare it to the applicable SCDOT and Beaufort County standards and/or plans. J. Auxiliary turn lane requirements. TIAs shall evaluate the need for right- and left-turn lanes at all project driveways. Right- and left-turn lanes shall be installed in accordance with the criteria and warrants contained in SCDOT's ARMS Manual. K. Traffic signalization. If a traffic signal is proposed as a mitigation measure, a preliminary traffic signal warrant analysis based on the Manual on Uniform Traffic Control Devices (MUTCD) shall be included in the study. While the installation of a traffic signal on projected volumes may not be able to be initially installed as the project traffic volumes are not yet realized, the Applicant shall provide funds for the future signal(s) to the County to deposit into an escrow or special account set up for this purpose, if future installation of a traffic signal(s) is approved. The Applicant is also responsible for conducting the future traffic signal warrant studies at the direction of the County. The Applicant should make any turn lane improvements during construction so that if in the horizon year a signal is warranted, one may be installed with little impact to the intersection. L. Mitigation and alternatives. The TIA should include proposed improvements or access management techniques as necessary to meet the LOS standards. The COUNTY will be responsible for final determination of mitigation improvements required to be constructed by the Applicant as a part of the development. Any improvements identified for the project including any future traffic signal installations are above and beyond any transportation impact fees. 7.5 Coordination with SCDOT The draft TIA shall be submitted to SCDOT and other applicable municipalities for review and comment. Any SCDOT comments or requirements shall be incorporated in the study. These comments shall be coordinated with County staff and shall be addressed prior to the finalization of the traffic study. 7.6 Review and Acceptance of Traffic Impact Analysis The COUNTY shall also review and approve the traffic study once all County and SCDOT comments are addressed. The COUNTY shall issue a memo or similar documenting the approval of the traffic study and the required mitigation associated with the project. Page 94 of 194 Beaufort County Standards & Specifications Page 19 7.7 Expiration Traffic Impact Analysis The COUNTY may require an update to a previously approved TIA if any of the following criteria are met: • If a proposed development does not commence within 12 months of the TIA. • If the scale, intensity, or phasing of the proposed development that were contemplated in the approved TIA are modified. • If the number of access points, location of access points, or type of access points (right-in/right-out driveway, full access driveway, etc.) that were contemplated in the approved TIA are modified. • If the built environment dictates a change in land use or traffic distribution from what was previously contemplated within an approved TIA. • If the proposed development is not completed within the proposed buildout date utilized in the TIA. CHAPTER 8. ROADSIDE ENCROACHMENTS 8.1 Refer to Chapter 9 of the ARMS Manual, latest edition and the following: A. Any object placed within Beaufort County right-of-way easements that is not installed by the County or it’s representative shall require an approved encroachment permit prior to installation. Mailboxes do not require a permit; however, installations shall meet the guidelines in the SCDOT ARMS manual and Section 57-7-210 of the South Carolina Code of Laws. B. The permittee will be required to maintain any item allowed in County right-of-way in perpetuity. C. Homeowner’s Associations are allowed to apply for encroachment permits for objects constructed in County right-of-way. These include subdivision entrance signs and landscaping. Irrigation and lighting installed under a roadway must be encased in conduit. The permittee will be responsible for repairing any damage to roadways caused by the failure or maintenance of permitted equipment. D. Irrigation installed within County right-of-way is at the risk of the property owner. Irrigation shall not spray water onto the roadway or walkway surface at any time. E. A property owner will be notified of any illegally placed object or obstruction within County right-of-way or easements and will have 30 days to move the object. The County will remove any object not removed by the property owner within the 30-day period. F. No encroachment shall impede sight distance. CHAPTER 9. DRAINAGE, ENVIRONMENTAL, AND EROSION CONTROL 9.1 Refer to the SOLOCO Manual for information. Page 95 of 194 Beaufort County Standards & Specifications Page 20 CHAPTER 10. BRIDGES, CULVERTS AND RETAINING WALLS 10.1 Refer to the SCDOT Bridge Manual (latest edition) for information. CHAPTER 11. CONSTRUCTION 11.1 General Information A. The landowner/developer responsibilities include: 1. Providing the County complete roadway and/or drainage system plans for the proposed development. 2. Securing South Carolina licensed and professional personnel to prepare designs acceptable to the County. 3. Overseeing and coordinating the presentations, reviews, and revisions of the designs with the appropriate agencies, and obtain required approvals and permits. 4. Providing field staking of the designs during the construction phase. 5. Coordinating County encroachment permit approval and subsequent inspections with the Engineering Department. 6. Providing third-party materials testing/inspections and/or quality control testing documentation to COUNTY. 7. Once the improvements proposed for public dedication are constructed, inspected, and approved by the County, the landowner/developer shall provide as-built record drawings, record plats, etc. to the COUNTY prior to final County acceptance of publicly dedicated roads. As-built record drawings must comply with Section F of this chapter and shall be submitted to the Beaufort County Engineering Department for review and approval. Once the as-built drawings are approved by the COUNTY, the public dedication request will be scheduled for a County Council Committee meeting for recommendation and subsequent County Council meeting for final determination. Final plats that include public dedications of roads and/or drainage will not be recorded until and unless County Council approves the dedication request(s), and all conditions of such approval are addressed prior to final plat recording. B. Coordination with other Reviewing Agencies. The design professional of record shall provide a list of all regulatory permits required for the construction of all road and drainage systems This list shall include the status of each permit along with corresponding application numbers and dates. The design professional-of- record shall provide a copy of all approved permits, deemed essential by the COUNTY to the COUNTY prior to final approval of the construction plans. C. Right-of-Way Width. The minimum Right-of-Way width for a Roadway to be accepted into the County maintenance system is 50 feet unless otherwise approved by the COUNTY. Refer to the Beaufort County Dirt Roads Manual for more information on dirt roads. D. Pedestrian Ways within Publicly Dedicated Right-of-Way. When pedestrian ways are provided within the publicly dedicated right-of-way, they shall be constructed in accordance with Chapter 5.1 section 3, ADA Requirements, unless otherwise approved by the COUNTY. For roadways with open roadside drainage systems, pedestrian ways shall be placed behind the swales or ditches. For roadways with closed system drainage systems, pedestrian ways shall have a minimum 5 ft of separation from the back of curb or edge of Page 96 of 194 Beaufort County Standards & Specifications Page 21 pavement. Additional right-of-way or easements may be required to accommodate proposed pedestrian ways. E. General Requirements for Construction Plan Approval. The design professionals shall prepare and submit one copy of roadway plans and profiles, including typical sections, drainage data, etc., to the Zoning and Planning and COUNTY for review and approval prior to beginning construction of the roadway and drainage systems. The designer's seal, signature, and South Carolina registration number shall be affixed to the plans and specifications. The Public Works Department reserves the right to request an electronic CAD or GIS file of the approved plans including layout, road/right-of-way location, drainage easements, and other pertinent information that may be used to augment the County GIS to be submitted with the as-built documents. Construction drawings at a minimum shall include the following, if applicable as determined by the Directors of the Zoning and Planning and Engineering Departments: 1. Roadway Design plans and profiles shall be prepared on 24-inch x 36-inch or 22-inch x 34-inch sheets, having a profile at the bottom and a plan view at the top, with both the plan and profile stationing oriented in the same direction. Residential and commercial plans may have a different sheet layout per the approval of COUNTY. 2. All elevations shall be referenced to the NAVD 88. State horizontal plane national NAV83. 3. Scales shall be vertical 1 inch=2 feet and horizontal 1 inch= 50 feet or larger. The following shall be shown in plan view: a. Stations along the centerline of the proposed road with appropriate ties at intersecting streets. b. The width of the right-of-way and names of proposed roads as approved by the Consolidated 9-1-1 Center (CDC), and names of existing roads. c. Alignment information, curve data with P.C., P.T., and P.I. angle points, as well as angles at intersections. d. Arrows indicating the direction of drainage flow within the right-of-way. e. Size, type, and location of trees proposed to remain within the clearing limits of the road right- of-way. f. DES /OCRM critical line and USACE jurisdictional wetland delineations which relate to the right-of- way or easements. g. Existing and proposed drainage structures and drainage easements along with rights-of-way and drainage way cross sections. h. Benchmarks with locations, descriptions, coordinates, datum, etc. i. Existing and proposed utility lines and utility easements. j. Road cross sections with sidewalks (when required). k. Details shall show sight distances, traffic control devices, design speeds for roads, and other related information. l. Other general construction details required to define the scope of work. Profiles shall show: I. Existing road centerline elevations showing all breaks in grade, but in no case more than 100’ feet apart. Profiles shall include existing roads to which ties are being made Page 97 of 194 Beaufort County Standards & Specifications Page 22 with elevations extending approximately 200’ feet from the intersection. II. Proposed street centerline profile with centerline elevations every 50’ feet on vertical curves and at 100’ feet along tangents and at intersections. III. Vertical curve data. IV. Proposed and existing storm drains, sanitary sewers, water mains, pipe under drains, and cross line pipes. V. Proposed grades of all ditches and swales on or off site. Show existing grades of incoming and outfall drainage ways for 200’ feet upstream/downstream if no grade changes are proposed. An overall drainage plan shall be submitted along with the plans and profiles and detail sheets. VI. The drainage plan sheet shall show the street layout and the entire drainage system to be constructed or improved, along with the sizes and invert elevations of drainage pipes, the widths of proposed and existing drainage easements, the direction of drainage flow (using arrows), detention ponds, outfall structures, lot drainage, existing canals, tidal streams, etc. VII. The drainage plan shall include pertinent drainage data such as drainage areas, runoff coefficients, times of concentration (with computations), runoff volumes, soils data, detention pond routing, pond crest elevations, and other related information. The following statements shall be included on the plans: 1. Statement to be placed by design professionals on road and drainage plans: "ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH REQUIREMENTS OF THE COUNTY DEVELOPMENT CODE." 2. Statement to be signed by the COUNTY or the authorized agent of the owner: “I certify as an agent for or as a record owner, lessee, or record easement holder, I have or will have prior to undertaking the work the necessary approval or permission from all other persons with a legal interest in said property to conduct the work proposed in the approved subdivision construction plans." F. Expiration Date for County's Approval of Construction Plans. Construction plan and specification approvals have the same duration as the preliminary plat approval. Refer to CHAPTER 8, Subdivision Regulations, for approval duration information. G. County Inspection. All work required by the County for the project shall be inspected by the COUNTY for compliance with the approved plans and specifications. Inspections will be made to verify the materials and workmanship of the contractor are meeting the contract specifications. Inspections will include material sampling and testing, material inspections, construction observation and monitoring, and/or proof roll inspections. The level and frequency of inspections will be sufficient to demonstrate quality assurance of the work as determined by the County. The COUNTY will make inspections when: a. The COUNTY has approved construction plans and specifications. b. Sufficient notice is given. The contractor/developer shall give a one-week notice to the COUNTY prior to beginning work at the site. After the initial notice, a 72-hour notice shall be given prior to beginning each operation (or continuing an operation when the work has been disrupted for more than one workday). c. A final project inspection shall be performed prior to scheduling the request for Council consideration. The inspector shall have the authority to: Page 98 of 194 Beaufort County Standards & Specifications Page 23 1. Certify that the construction and materials comply with the approved construction plans and regulations. 2. Certify that material quantities comply with the approved construction plans. 3. Approve or reject materials and/or their installation in accordance with the approved construction plans, specifications, and regulations. 4. Suspend work with the approval of the COUNTY. H. Site Cleanup and Finish Grading. Prior to roadway and drainage system acceptance, the right-of-way and drainage easements shall be cleared of all construction trash and debris. Lots or other areas designated on the approved plans requiring fill or grading shall also be completed. I. Maintenance Guarantees. Roadway and stormwater management/drainage systems that are to be dedicated to Beaufort County for public ownership and maintenance shall be under warranty for all defects and failures as described in this Section for a period of one (1) year. Prior to Final Plat approval, the Developer shall provide written verification of financial responsibility for correction of defects and/or failures to systems to be dedicated to the County. The warranty (minimally established at 20 percent of the construction cost) shall be in an amount satisfactory to the COUNTY and effective for a period of two years from County Council’s acceptance date, provided, however, that period may be extended at the COUNTY’S discretion. The financial warranty shall be in the form of a no-contest, irrevocable bank letter of credit, a performance and payment bond underwritten by an acceptable South Carolina licensed corporate surety, or a cashier’s check. Payment is subject to County Attorney approval of the guarantee to determine that the interests of Beaufort County are fully protected. If a cashier’s check is utilized, then the opinion of counsel may be waived. The Beaufort County Engineering Department shall maintain surveillance over the system and provide written notification to the landowner/Developer if repair work is required during the warranty period. The Beaufort County Engineering Department shall identify defects not considered to be a public safety issue and notify the landowner/Developer of such defects. The landowner/Developer shall have 30 days to prepare and submit a schedule of corrective actions for approval by the COUNTY. If defects are not satisfactorily repaired within the approved schedule, the Beaufort County Engineering Department will resolve the defects and bill the bonding company accordingly. The Beaufort County Engineering Department shall address public safety defects immediately. Subsequently, the bonding company will be billed for reimbursement. J. Road Classifications and Traffic Data. Roadways in the County system are classified as one of the following: a. Minor Rural b. Secondary Rural c. Local Page 99 of 194 Beaufort County Standards & Specifications Page 24 d. Collector e. Arterial/Industrial 11.2 Minor Rural Road Standards A. Classification 1. Maximum of 10 Lots or 100 ADT. 2. Proposed paved speed limit under 30 mph. 3. Road length less than 0.5 mile and not identified as cut-through resulting in higher ADT. B. Design Requirements. 1. Required Right-Of-Way. The standard right-of-way width is 50 feet. Reduced right-of-way width may be accepted on a case-by-case basis. 2. Required Minimum Typical Section. Roads shall have a minimum travel way width of 18 feet. Ditch sections will consist of a minimum shoulder width of 3 feet, 3:1 maximum front slope, and 2:1 maximum back slope for ditches. Any fixed objects (electric poles, trees, etc. must be a minimum of 2 feet from the back of curb or 4 feet from edge of travel way. 3. Required Minimum Road Elevations. The minimum road centerline elevation at finish grade shall be elevation 7.5 based on NAVD 88. 4. Required Minimum Profile Gradient. The minimum road profile centerline gradient shall be 0.5% except for causeways where land areas adjacent to the road embankment are jurisdictional wetlands or OCRM Critical Area or as approved by COUNTY. 5. Road Centerline Minimum Curve Radius Criteria. Road centerline curve radii shall meet AASHTO guidelines for the design speed limit. 6. The design professional shall provide supporting design data, including traffic control signage, supporting the design speed. 7. All roads shall be designed with a minimum road centerline radius of 125 feet. 8. Horizontal sight distances shall be considered in the design process. 9. Vertical curves shall have a minimum length of 100 feet. C. Roadway Drainage Design. The roadway drainage design must show, at a minimum, how the drainage is directed away from the travel way. Refer to the SOLOCO Manual for spread calculations of 25-year storm events and ponding within travel lanes. D. Clearing and Grubbing. Minor rural road right-of-way shall be cleared and grubbed for a minimum width of 30 feet or to the required limits of disturbance. Tree canopies shall be pruned to a minimum height of 16.5 feet. Tree removal shall comply with the Beaufort County tree ordinance. 11.3 Secondary Rural Road Standards A. Classification 1. Maximum of 400 ADT. 2. Proposed paved speed limit under 40 mph. 3. Road is in a rural setting with a low residential density per mile and no commercial traffic. B. General Design Requirements. 1. Required Right-Of-Way. The required right-of-way width is 50 feet. Page 100 of 194 Beaufort County Standards & Specifications Page 25 2. Required Minimum Typical Section. Roads shall have a minimum travel way width of 20 feet. Ditch sections will consist of a minimum shoulder width of 3 feet, 3:1 maximum front slope, and 2:1 maximum back slope for ditches. Any fixed objects (electric poles, trees, etc. must be a minimum of 2 feet from the back of curb or 5 feet from edge of travel way. 3. Required Minimum Road Elevations. The minimum road centerline elevation at finish grade shall be elevation 7.5 based on NAVD 88. 4. Required Minimum Profile Gradient. The minimum road profile centerline gradient shall be 0.5% except for causeways where land areas adjacent to the road embankment are jurisdictional wetlands or OCRM Critical Areas. 5. Road Centerline Minimum Curve Radius Criteria. Road centerline curve radii shall meet AASHTO guidelines for the design speed limit. 6. The design professional shall provide supporting design data, including traffic control signage, supporting the design speed. 7. All roads shall be designed with a minimum road centerline radius of 125 feet. 8. Horizontal sight distances shall be considered in the design process. 9. Vertical curves shall have a minimum length of 100 feet. C. Roadway Drainage Design. Refer to the SOLOCO Manual for information D. Clearing and Grubbing. Secondary Rural Road right-of-way shall be cleared and grubbed for a minimum width of 40 feet or to the required limits of disturbance. Tree canopies should be pruned to a minimum height of 18.0 feet. Tree removal shall comply with the Beaufort County tree ordinance. E. Clearing of Drainage Easements. The full width of all drainage easements shall be cleared of trees, buildings, fences, stumps, brush, logs, rubbish, roots, overhanging tree limbs, overhanging utility wires or cables, or any other item that may, in the judgment of COUNTY interfere with the drainage facility or the maintenance of the facility. Existing obstacles may be left in place upon approval of COUNTY provided that all of the following criteria are met: 1. The drainage system or obstacle cannot be easily relocated. 2. Adequate and safe operational easement space for maintenance by mechanized equipment is provided. 3. The drainage way is not obstructed. 4. The drainage easement width is increased to accommodate the obstructions. Tree removal shall comply with the Beaufort County tree ordinance. 11.4 Local Road Standards A. Classification 1. Maximum of 750 ADT. 2. Road is in a residential or commercial setting with very little truck traffic. 3. Road feeds into a collector road or highway. B. General Design Requirements. 1. Required Right-Of-Way. The minimum required right-of-way width is 50 feet. 2. Required Minimum Typical Section. Roads shall have a minimum travel way width of 22 feet. Ditch sections will consist of a minimum shoulder width of 4 feet, 3:1 maximum front slope, and 2:1 Page 101 of 194 Beaufort County Standards & Specifications Page 26 maximum back slope for ditches. Any fixed objects (electric poles, trees, etc.) must be a minimum of 2 feet from back of curb or 5’ from the edge of travel way or as approved by COUNTY. 3. Required Minimum Road Elevations. The minimum road centerline elevation at finish grade shall be elevation 7.5 based on NAVD 88. 4. Required Minimum Profile Gradient. The minimum road profile centerline gradient shall be 0.5% except for causeways where land areas adjacent to the road embankment are jurisdictional wetlands or OCRM Critical Areas. 5. Road Centerline Minimum Curve Radius Criteria. Road centerline curve radii shall meet AASHTO guidelines for the design speed limit. 6. The design professional shall provide supporting design data, including traffic control signage, supporting the design speed. 7. All roads shall be designed with a minimum road centerline radius of 125 feet. 8. Horizontal sight distances shall be considered in the design process. 9. Vertical curves shall have a minimum length of 100 feet. C. General Requirements of Design of Drainage Systems. Refer to the SOLOCO Manual for information. D. Roadway Drainage Design. Refer to the SOLOCO Manual for information. Outfall ditches to wetland areas shall be piped for a minimum length of 20 feet at their outfall ends, or an alternative means of defining wetlands’ limits for maintenance identification purposes shall be submitted for consideration. E. Maintenance Plan. When Best Management Practices (BMPs) are required by local or state agencies or proposed by the design professional, a maintenance plan must be provided in accordance with the SOLOCO Manual. F. Clearing and Grubbing. Local Road right-of-way shall be cleared and grubbed for the full right-of-way width. Refer to current tree ordinance for pruning and/or removal. Tree removal shall comply with the Beaufort County tree ordinance. G. Clearing of Drainage Easements. The full width of all drainage easements shall be cleared of all trees, buildings, fences, stumps, brush, logs, rubbish, roots, overhanging tree limbs, overhanging utility wires or cables, or any other item that may, in the judgment of the COUNTY interfere with the drainage facility or the maintenance of the facility. Refer to current tree ordinance for pruning and/or removal. Existing obstacles may be left in place upon approval of the COUNTY provided that all of the following criteria are met: a. The drainage system or obstacle cannot be easily relocated. b. Adequate and safe operational easement space for maintenance by mechanized equipment is provided. c. The drainage way is not obstructed. d. The drainage easement width is increased to accommodate the obstructions. Tree removal shall comply with the Beaufort County tree ordinance. Page 102 of 194 Beaufort County Standards & Specifications Page 27 11.5 Collector Road Standards A. Classification 1. Over 750 ADT. 2. Road is in a residential or commercial setting. Serves other residential roads and is main connection to highway network. In commercial settings, has up to 5% truck traffic. B. General Design Requirements. 1. Required Right-Of-Way. The minimum right-of-way width is 50 feet; however, the road right-of-way must be of sufficient width to provide for the following: a. Drainage b. Pavement and curb and gutter c. Shoulders d. Trees e. Signage f. Sidewalks where installed (or required) g. Utilities such as streetlights and overhead/underground utility lines (electric, telephone, cable TV, gas, water, and sewer). 2. Required Minimum Typical Section. Roads shall be constructed with curb and gutter and have a minimum travel way width of 22 feet or 11-foot travel lanes. 3. Required Minimum Street Elevations. The minimum road centerline elevation at finish grade shall be elevation 7.5 based on NAVD 88. 4. Required Minimum Profile Gradient. The minimum road profile centerline gradient shall be 0.5% except for causeways where land areas adjacent to the road embankment are jurisdictional wetlands or critical areas. 5. Road Centerline Minimum Curve Radius Criteria. Road centerline curve radii shall meet AASHTO guidelines for the design speed limit. 6. The design professional shall provide supporting design data, including traffic control signage, supporting the design speed. 7. All roads shall be designed with a minimum road centerline radius of 125 feet. 8. Horizontal sight distances shall be considered in the design process. 9. Vertical curves shall have a minimum length of 100 feet. C. General Requirements for Design of Drainage Systems. Refer to the SOLOCO Manual for information D. Roadway Drainage Design. Refer to the SOLOCO Manual for information. E. Subsurface Drainage. 1. Where pipe under-drains are required (based on Geotechnical Report), their centerline shall be located 3.0 feet, at a minimum, behind the back of curb and shall be properly connected to a permanent drainage outlet, such as a catch basin, junction box, or a manhole. 2. Piped underdrains shall conform to the underdrain details in section 802 of the SCDOT (SS). Underdrain Page 103 of 194 Beaufort County Standards & Specifications Page 28 inverts shall be a minimum of 24 inches below the bottom of the curb and above any static lake/pond elevation. 3. Suitable outlets for the pipe under-drains shall be provided in the drainage system design. 4. Pipes under-drains shall be installed at low points in the grade on both sides of the road for a minimum distance of 100 feet in each direction along the road; except at locations where the design engineer can demonstrate to the satisfaction of the COUNTY that the water table will not be within 24 inches of centerline subgrade elevation. 5. Pipes underdrains, where required, shall be installed before the base course is placed. 6. Pipes underdrains shall be placed in other locations as determined by the design professional or as required by the COUNTY during construction. 7. Pipe underdrains shall be properly laid on grade, in accordance with these specifications, the SCDOT (SS), and shall not be covered until they have been inspected and approved by the COUNTY. 8. Alternative under-drain designs shall be presented to the COUNTY for review and approval. F. Maintenance Plan. When Best Management Practices (BMP) are required by local or state agencies or proposed by the design professional, a maintenance plan must be provided in accordance with the SOLOCO manual. G. Piping and Easements. Unless justification is provided, to the satisfaction of the COUNTY all drainage easements within the urban areas of the County shall be required to follow the SOLOCO manual. H. Clearing and Grubbing. Collector road right-of-way shall be cleared and grubbed for the full right-of-way width. Tree removal shall comply with the Beaufort County tree ordinance. I. Clearing of Drainage Easements. The full width of all drainage easements shall be cleared of all trees, buildings, fences, stumps, brush, logs, rubbish, roots, overhanging tree limbs, overhanging utility wires or cables, or any other item that may, in the judgment of the COUNTY interfere with the drainage facility or the maintenance of the facility. Existing obstacles may be left in place upon approval of the COUNTY provided that all of the following criteria are met: 9. The drainage system or obstacle cannot be easily relocated. 10. Adequate and safe operational easement space for maintenance by mechanized equipment is provided. 11. The drainage way is not obstructed; and 12. The drainage easement width is increased to accommodate the obstructions. Tree removal shall comply with the Beaufort County tree ordinance. 11.6 Arterial/Industrial Road Standards A. Classification 1. Over 750 ADT. 2. Road is in a commercial setting such as an industrial park. Has high ADT, multi-lane or median typical section, and has considerable truck traffic. B. General Design Requirements. 1. Required Right-Of-Way. The minimum right-of-way width is 66 feet; however, the road right-of-way must be of sufficient width to provide for the following: a. Drainage Page 104 of 194 Beaufort County Standards & Specifications Page 29 b. Pavement and curb and gutter c. Shoulders d. Trees e. Signage f. Sidewalks where installed (or required) g. Utilities such as streetlights and overhead/underground utility lines (electric, telephone, cable TV, gas, water, and sewer). 2. Required Minimum Typical Section. Roads shall have a minimum lane width of 12 feet. Roads shall have a cross-slope of 2% unless specified in roadway design guidelines or approved by the COUNTY. Closed drainage systems shall consist of barrier curb. Ditch sections will consist of a 6-foot shoulder, maximum 3:1 front slope and maximum 2:1 back slope. 3. Required Minimum Road Elevations. The minimum road centerline elevation at finish grade shall be elevation 7.5 based on NAVD 88. 4. Required Minimum Profile Gradient. The minimum road profile centerline gradient shall be 0.5% except for causeways where land areas adjacent to the road embankment are jurisdictional wetlands or critical areas. 5. Road Centerline Minimum Curve Radius Criteria. Road centerline curve radii shall meet AASHTO guidelines for the design speed limit. a. The design professional shall provide supporting design data, including traffic control signage, supporting the design speed. 6. All roads shall be designed with a minimum road centerline radius of 125 feet. 7. Horizontal sight distances shall be considered in the design process. 8. Vertical curves shall have a minimum length of 100 feet. C. General Requirements for Design of Drainage Systems. The design of drainage facilities for a development must be done with consideration being given to the entire drainage basin. Provisions must be made to receive and manage runoff from upstream areas and to ensure that downstream areas are not adversely impacted by discharges or runoff. The current zoning of upstream properties and associated runoff factors representing that land use, assumed to be fully developed, shall be used in determining design runoff rates and quantities. It is not to be assumed that existing developed properties without storm water detention systems will have them in the future. Drainage design requirements for the entire development shall conform to the SOLOCO Manual. D. Roadway Drainage Design. Stormwater systems conveying flow to or from roads shall be piped unless otherwise approved by the COUNTY. Curb inlet structures shall be located so that drainage shall not be carried in gutters for a distance exceeding 500 feet (accumulated distance). The 10-year average return frequency storm shall not cause water to flow onto the road for a spread width greater than 5 feet. Culvert piping running longitudinally with the road shall not be located under the pavement or curb and gutter, nor shall it conflict with the normal location of under drains. E. Subsurface Drainage. 1. Where pipe underdrains are required, their centerline shall be located 3.0 feet, at a minimum, behind the back of curb and they shall be properly connected to a permanent drainage outlet, such as a catch Page 105 of 194 Beaufort County Standards & Specifications Page 30 basin, junction box, or a manhole. 2. Piped underdrains shall conform to the underdrain details in section 802 of the SCDOT (SS). Underdrain inverts shall be a minimum of 24 inches below the bottom of the curb and above any static lake/pond elevation. 3. Suitable outlets for the pipe underdrains shall be provided in the drainage system design. 4. Pipe underdrains shall be installed at low points in the grade on both sides of the road for a minimum distance of 100 feet in each direction along the road; except at locations where the design engineer can demonstrate to the satisfaction of the STORMWATER DEPARTMENT that the water table will not be within 24 inches of centerline subgrade elevation. 5. Pipe underdrains, where required, shall be installed before the base course is placed. 6. Pipe underdrains shall be placed in other locations as determined by the design professional or as required by the STORMWATER DEPARTMENT during construction. 7. Pipe underdrains shall be properly laid on grade, in accordance with these specifications, the SCDOT (SS), and shall not be covered until they have been inspected and approved by the STORMWATER DEPARTMENT. 8. Alternative underdrain designs shall be presented to the STORMWATER DEPARTMENT for review and approval. F. Maintenance Plan. When Best Management Practices are required by local or state agencies or proposed by the design professional, a maintenance plan must be provided in accordance with the SOLOCO manual. G. Piping and Easements. Unless justification is provided, to the satisfaction of the STORMWATER DEPARTMENT all drainage easements within the urban areas of the County shall be required to follow the SOLOCO Manual. H. Clearing and Grubbing. Except as otherwise stated herein, all arterial/industrial road rights-of-way shall be cleared and grubbed for the full width of the right-of-way. Any/all tree canopies shall be pruned to a minimum height of 16 feet. Selected specimen trees may be permitted to remain within the right-of-way when the following conditions are met: 1. Trees are healthy, of aesthetic value, and are firmly rooted with the base of the tree being at or near the elevation of the curb or edge of pavement. 2. The distance from the back of the curb to the nearest face of the tree is not less than 6 feet. If no curb is present, the distance from the edge of pavement to the nearest face of the tree must be no less than 10 feet. 3. Additional right-of-way is provided where necessary. Tree removal shall comply with the Beaufort County tree ordinance. I. Clearing of Drainage Easements. The full width of all drainage easements shall be cleared of all trees, buildings, fences, stumps, brush, logs, rubbish, roots, overhanging tree limbs, overhanging utility wires or cables, or any other item that may, in the judgment of the COUNTY interfere with the drainage facility or the maintenance of the facility. Existing obstacles may be left in place upon approval of the STORMWATER DEPARTMENT provided that all of the following criteria are met: 1. The drainage system or obstacle cannot be easily relocated. 2. Adequate and safe operational easement space for maintenance by mechanized equipment is provided. 3. The drainage way is not obstructed; and 4. The drainage easement width is increased to accommodate the obstructions. 5. Tree removal shall comply with the Beaufort County tree ordinance. Page 106 of 194 Beaufort County Standards & Specifications Page 31 11.7 Road Design A. Dead Ends. 1. Cul-de-Sac Streets. Cul-de-Sac Streets shall be provided at the terminus of closed end roads with a minimum radius of 40 feet. 2. Temporary Cul-de-Sacs. Temporary cul-de-sacs shall be provided when incremental road construction and/or phasing is requested by the developer. Temporary cul-de-sacs shall be constructed as required by this section. Unpaved temporary cul-de-sacs shall require an additional 2 inches (compacted depth) of base course. 3. Construction Access. The design professional shall identify the development's construction access routes and submit its proposed road section and surface course design for approval by the COUNTY. 4. Inverted Crown Roads. Roads designed or constructed with inverted crowns shall not qualify for public road acceptance by Beaufort County. B. Pavement Design. 1. All pavement design shall be verified and/or provided by a design professional. 2. Pavement Base and Surfaces Courses. The base course shall meet the County Standards or the SCDOT (SS). All inspection of work shall have a certification in the particular area that is being inspected (SCDOT Earthwork & Base, SCDOT HMA Roadway, etc.). The width of the base course shall be 12 inches greater than the width of the surface course, i.e., 6 inches on each side of the roadway. The compacted depth of the base course shall be 6 inches or greater as approved by the COUNTY. After the base course has been properly blended, mixed, wetted, shaped, and compacted to the approved typical section and has been seasoned sufficiently and proof-rolled, the surface course shall be applied. a. Proof-rolling shall be accomplished as described in the County Standards or the SCDOT (SS) for the proof-rolling of the subgrade except that the minimum total weight of the testing vehicle shall be in the 30-to 35-ton range. b. The surface course materials, placement, and protection shall meet the requirements of the SCDOT (SS) type C or equal. The compacted depth of the surface course shall be no less than 2 inches or greater over 6 inches of base course as approved by the COUNTY. Weather and seasonal restrictions to placement of the bituminous materials are described in the County Standards or the SCDOT (SS). 3. Pavement Section for Typical Residential Roadway. The County standard asphalt pavement section for use on residential roadways is a minimum 2 inches (220 lbs/SY) of compacted hot plant mix asphaltic concrete meeting the County Standards or the SCDOT (SS), type C surface course. This material is to be placed on a 6-inch minimum compacted base course and an approved subgrade. A prime coat meeting the County Standards or the SCDOT (SS) is required when the base course will not be paved within one week. Roadways serving large residential areas or phased subdivisions may require pavement designs, exceeding the minimum requirements, as determined by the COUNTY. Asphalt compaction is to meet the minimum requirements in the SCDOT (SS). 4. Pavement Design for Commercial/Industrial Use Roadways. The design engineer shall provide a pavement design for all roadways that serve commercial and industrial uses. The design shall include at a minimum 2 inches of compacted hot plant mix asphaltic concrete meeting the County Standards or the SCDOT (SS) type one, or equal, and a minimum 6 inches of compacted base course meeting the COUNTY STANDARDS or the SCDOT (SS), with an approved subgrade. The pavement design shall Page 107 of 194 Beaufort County Standards & Specifications Page 32 include information on anticipated traffic counts, traffic loadings, and site-specific soils. Further, the COUNTY may require other pertinent information. A site-specific geotechnical report prepared by a geotechnical engineer shall be provided to substantiate/justify the proposed design for the entire length of the roadways to be constructed. A prime coat meeting the County Standards or the SCDOT (SS) is required when the base course will not be paved within one week. 5. Alternative Pavement Designs. The County will consider alternative pavement materials designs. The design professional should present appropriate design data including laboratory tests of foundation soils to substantiate/justify the proposal. 11.8 Construction A. Soil Testing. The COUNTY will determine the quality of foundation soils by visual observations and adequate soil testing provided by the design professional. Without such testing, the COUNTY will utilize judgment and experience to determine the quality of the foundation material and shall require appropriate action including, but not limited to, undercutting or mucking and replacing the excavated material with suitable earth materials. The contractor is responsible for providing quality control testing. B. Grading. Roads shall be graded to the designed typical section in accordance with the approved plans and profiles. Grade stakes shall be set on centerlines at intervals of not more than 100 feet on tangent grades and not more than 50 feet on vertical curves. Additional grade stakes may be required to ensure that the final grade matches the designed typical section in the profile. a. Grading work, materials, methods, and equipment, unless approved otherwise, shall be in accordance with the requirements of the County Standards or the SCDOT (SS). b. No base or surfacing materials shall be placed before the subgrade is inspected and approved by the COUNTY. c. In general, soils classified lower than “SC,” according to the Unified Soil Classification System, are not acceptable for the upper 24 inches of the Subgrade. d. The compacted subgrade shall be proof rolled prior to placement of any base or surfacing materials. Testing shall be performed in the presence of Beaufort County Engineering Department or their designee. The testing procedure shall follow the SCDOT specifications. Any areas exhibiting pumping or breaking of the surface shall be stabilized or removed to appropriate depth and replaced with suitable material, recompacted, and retested. C. Subgrade. Work shall consist of the construction and preparation of subgrade - the part of a roadway intended to receive the base course, pavement, pedestrian way, curb and gutter, and/or shoulders. a. Roads shall be graded to the designed typical section in accordance with the approved plan and profile, and shall be free of roots, trash, and other unsuitable materials for a minimum depth of 18 inches below the finished subgrade. b. A suitable soil is required for a minimum depth of 18 inches immediately below the base course to provide a road that will serve the traffic needs in extremely dry, normal, and in wet weather. Where necessary, a stabilizing-type soil shall be added and properly mixed with the soil in place for a depth of not less than 6 inches. c. When unstable material is encountered and it is necessary to perform mucking work, the roadway shall be mucked for its entire width, ditch line to ditch line or extending 2 feet beyond the back of curb; backfilled with a suitable, stable-type soil; and properly compacted. All objectionable loose rock or boulders shall be removed or broken off to a depth of not less than 18 inches below the surface of the subgrade. Granular stone or geotextile materials may be approved by Beaufort County Engineering Department as a bridge lift. Page 108 of 194 Beaufort County Standards & Specifications Page 33 d. The subgrade is to have sufficient moisture content and shall be compacted for a width extending 2 feet outside the edges of the proposed pavement before the base course is placed. e. Subgrade lift material shall be compacted to not less than 95 percent of maximum density per SC- T-29 & 30 for lift thicknesses over 6 inches. Maximum loose lift thickness for embankment and subgrade soils is 8 inches. Density testing will be required once every 500 linear feet in alternating lanes and a minimum of 3 tests per road. The entire subgrade will be inspected by Beaufort County Engineering Department via proof roll prior to approval of placement of base course. f. The subgrade shall be maintained in a smooth and compacted condition, free from ruts and depressions, and shall be adequately drained. In no case shall any base, surface course, or pavement be placed on a frozen, muddy, or unstable subgrade. Storing or stockpiling of materials directly on the subgrade will not be permitted except with the approval of Beaufort County Engineering Department. D. Base Courses. Following the COUNTY’S approval of subgrade, base course shall be immediately applied to protect the installed subgrade. The type of base course approved for the pavement design will follow SCDOT specifications and the following: a. Aggregate Base Course. Material shall meet SCDOT gradation requirements and be compacted to a minimum of 98% of maximum density via modified proctor method. Density testing and depth checks will be required once every 500 linear feet in alternating lanes and a minimum of 3 tests per road. Tolerances for accepted base course depth will follow SCDOT specifications. Additional depth checks may be performed to determine extent of unacceptable base lift. A proof-roll will be required to approve base course for paving. Moisture content and surface of base must be maintained daily, or pavement installed within 72 hours of base course approval to avoid placement of prime coat. b. Sand Clay Base Course. Material shall meet SCDOT gradation requirements and be compacted to a minimum of 98% of maximum density via standard proctor method. Density testing and depth checks will be required once every 500 linear feet in alternating lanes and a minimum of 3 tests per road. Tolerances for accepted base course depth will follow SCDOT specifications. Additional depth checks may be performed to determine extent of unacceptable base lift. A proof-roll will be required to approve base course for paving. Moisture content and surface of base must be maintained daily, or pavement installed within 72 hours of base course approval to avoid placement of prime coat. c. Asphalt Base Course. Asphalt base course materials, application, and testing shall follow Section 300/400 of the latest SCDOT specifications. The Contractor will be responsible for providing all quality control inspections and documentation. Mix designs, load tickets, and test reports shall be provided to the Engineer and COUNTY. d. Cement Modified Base Courses. All cement modified base courses are subject to approval by COUNTY to include earth bases, recycled bases, aggregate modified bases, and reclaimed bases. Special consideration must be given when considering these methods to the site location, population density and proximity to housing, weather conditions, and restrictions. Cement modified bases applied to an existing roadway must be paved between 3-7 calendar days of mixing or have a surface treatment applied. Cement modified mixes, application procedures, and testing shall follow the latest SCDOT specifications. e. Recycled Concrete. Refer to the SCDOT Supplemental Technical Specification (SC-M-306, latest edition). Other base courses are at the discretion to be approved by Beaufort County. E. Sidewalks and Curb & Gutter. Requirements for sidewalks and curb & gutter will follow the details provided in Chapter 5 of this manual and SCDOT specifications. Minimum sampling and compressive strength testing for concrete will be every 50 CY or one sample per day unless otherwise specified in Page 109 of 194 Beaufort County Standards & Specifications Page 34 the construction documents. Sampling and testing procedures will follow (SS). F. Closed Storm Drainage systems. The STORMWATER DEPARTMENT accepts drainage systems based on the Smooth Walled Pipe (SWP) specification. The STORMWATER DEPARTMENT reserves the right to specify material types in designated locations if it is in the best interest of the County for structural or maintenance considerations. a. All materials for pipe, catch basins, drop inlets, manholes, junction boxes, or other structures must meet latest SCDOT specifications. b. Backfill requirements under the roadway must meet SC-M-714 technical supplemental specification. Backfill requirements outside of the pavement structure shall consist of suitable backfill, clean of debris, and meeting the classifications outlined in Section 200 of the SCDOT specifications. The STORMWATER DEPARTMENT or their designee shall approve the use of backfill material. c. Backfill material shall be compacted to not less than 95 percent of maximum density per SC-T-29 & 30 for at a maximum loose lift thicknesses of 8 inches. Maximum loose lift thickness for embankment and subgrade soils is 8 inches. Density testing will be required once every 500 linear feet for pipes outside of the pavement structure and at all crossline pipes under the roadway, per lift. d. Video inspect installed stormwater pipe systems in accordance with Section 714.3.11 of the SC- M-714 technical supplemental specification or as approved by STORMWATER DEPARTMENT. G. Paving. Asphalt paving materials, application, and testing shall follow Section 400 of the latest SCDOT specifications. The contractor will be responsible for providing all quality control inspections and documentation. Mix designs, load tickets, and test reports shall be provided to the Engineer and the COUNTY. a. A pre-pave meeting with the contractor, engineer, inspector, and paving foreman shall be held prior to HMA surface placement. b. All HMA mix designs must be approved by the SCDOT prior to use. c. When it is necessary to maintain traffic on a road or a section of road before prime coat has time to sufficiently dry to prevent pickup, apply sand, or some approved granular material as a cover as directed by the COUNTY. The cost of furnishing this material and performing this work shall be incidental to the cost of the hot mix asphalt. d. HMA paving shall follow all temperature restrictions provided in the specifications. The COUNTY may waive any seasonal paving restrictions at their discretion. e. The COUNTY will allow pay adjustments for asphalt cement fluctuations greater than 5% up or down from the prevailing base price. This adjustment will be based on SCDOT monthly indexes and follow Section 401 of the SCDOT specifications. Fuel adjustments for HMA will not be made. f. Concrete pavements may be approved for use by the COUNTY. If approved, all materials, application, and testing shall follow Section 500 of the SCDOT specifications. g. Asphalt surface treatments may be allowed on certain low volume roads as determined by the COUNTY. Materials, application, and testing shall follow Sections 406-408 of the SCDOT specifications including the use of lightweight aggregate. H. Seeding and Stabilization. All unpaved and disturbed areas within county right-of-way or limits of disturbance shall meet the stabilization requirements provided in the plans, applicable permits and under SOLOCO, unless governed by SCDOT SC-M-810 Specification (latest edition). The contractor shall be responsible for use of best management practices (BMPs) necessary to control sediment on- site throughout construction. The COUNTY shall complete and sign the SCDOT Seeding Inspection Page 110 of 194 Beaufort County Standards & Specifications Page 35 Form at the time of installation. The contractor will maintain the site during construction, placing temporary seeding for disturbed areas that are inactive for two weeks, establishing permanent vegetation, and the maintenance of areas until the project is accepted by the COUNTY. If the project is permitted under an NPDES permit, all requirements and activities must meet the conditions of the permit. I. Traffic Control/Signage. Traffic control items and permanent signage shall meet the requirements of the Manual on Uniform Traffic Control Devices (MUTCD), Section 600 of the latest SCDOT specifications, any applicable permits, or otherwise approved by the COUNTY. a. The contractor/developer is responsible for maintaining and resetting signage on an existing road project. b. The contractor/developer is responsible for providing all signage required on a new roadway. Street names will be approved by the COUNTY and color requirements will be provided. c. If detailed traffic control plans are not provided, a predetermined Traffic Control Plan (TCP) shall be submitted 7 days prior to the start of work for approval by the COUNTY. d. If requested, the COUNTY may approve temporary road closings to help facilitate the completion of work. The request must be given with sufficient notice to review, approve, and notify school districts and public safety of the closing. Road closings must provide access to property by local traffic and follow the hours of operation. e. Failure to provide traffic control equipment and procedures meeting these requirements will result in a stop work order and possible reduction in traffic control maintenance payments. f. Striping plans will be at the discretion of BCE/PW. Any striping/marking materials shall meet MUTCD and SCDOT specifications. CHAPTER 12. LANDSCAPING GUIDELINES 12.1 Refer to the County Development Code for information. CHAPTER 13. DIRT ROADS Dirt Road Improvement Policy July 29, 2026 Beaufort County is committed to improving public dirt roads where citizens desire and as funding becomes available. The first step is always to determine if the dirt road is in the public roadway system and if so, how much available right of way is there. If the road is not in the public system, then Policy Statements 15 and 17 provide guidance for bringing them into the public system. Certain requirements must be met for consideration to bring any private road into the Beaufort County roadway system. These include: Page 111 of 194 Beaufort County Standards & Specifications Page 36 The road cannot be owned on both sides by one owner, which the County defines as a “private driveway”. The road must be directly accessible from a public road. The road must serve at least six (6) dwelling units. A “Road Acceptance Application” must be submitted and signed by all associated property owners. Final decision on acceptance will be determined by a vote of County Council. Process: For roads that are in the public system and the residents agree to improvement, then this policy provides guidelines for that process. Beaufort County Engineering Department will conduct a site visit to determine right of way needs and road section. Other required elements for paving shall be considered at this time. The Beaufort County Right of Way Manager will then verify the deeded right of way that exists in the public road system, determine any additional right of way needs and prepare the preliminary letter to residents about right of way acquisition. Right of Way Manager will follow the approved procedure to formalize County Right of Way for the road (see Ordinance 2025/30). When formal right of way has been secured, the road can be included in the Dirt Road Improvement Plan according to where it would normally fall due to established criteria. Each year, based on available funding, roads will be included in that year’s dirt road improvement contract. These roads will follow the design-build model of construction following the County’s standard specifications and drawings. Roadway Prioritization: A five-year dirt road improvement plan is prepared and adopted by Council every several years. The plan preparation includes an evaluation of all County maintained dirt roads. Roads are evaluated based on condition, right-of-way, and traffic volume. Approximately 40 roads have full right-of-way out 172 roads that the County maintains. About 20 of those are included in the current five-year plan. County will prioritize obtaining right-of-way for roads in the order that they are ranked in the evaluation. If right-of-way is obtained prior to the next evaluation, the roadway ranking will be reconsidered based on having full ROW but will not be prioritized over those currently on the five-year plan. Page 112 of 194 Beaufort County Standards & Specifications Page 37 Aggregate Surfaced Roads: Roadways that will be surfaced with aggregate should be constructed in approximate accordance with the FHWA Gravel Roads Construction and Maintenance Guide, as applicable, and meet the following specifications. Roads shall be surfaced with graded aggregate base course (GABC) meeting SCDOT standards and specifications, as appropriate, or approved alternate. Local materials shall be prioritized. Recycled concrete shall not be used for roadway surface. Asphalt millings may be utilized if approved by staff. Millings shall not be used as standalone surface material, unless prior approval is received, but must be mixed with clean aggregate to achieve an approved gradation. Aggregate shall be constructed to achieve six (6) inch compacted thickness minimum. Roadway surface must receive adequate moisture conditioning and compaction so that it will pass a proofroll with a fully loaded tandem axle dump truck with minimum rutting, pumping, or observable surface deformations. Road surface shall be sloped to maintain positive drainage. Design Standards: The following design standards shall be used on all dirt roads in the Beaufort County roadway system unless otherwise directed by the Beaufort County Engineering Director. Geotechnical exploration shall be performed. SPT borings or hand augers with DCP should be extended, at a minimum, every 500’ going from right-center-left. Borings should be extended to a depth great enough to achieve relevant design information. At least one (1) infiltration test shall be performed per roadway. Roadway surface section will be determined based upon available ROW, geotechnical exploration, and other design considerations. The standard road section will have 1 ¾” (192.5 lb./sy) surface “C” hot mix asphalt (HMA) with 6” graded base course as a minimum. Within SCDOT ROW road section shall be 2” surface “C”, 2” intermediate “C” asphalt on 8” graded aggregate base. Pavement section shall be verified using SCDOT Pavement Design methodology or AASHTO 93. Roadway geometry shall be determined based on existing alignment and available right of way. Refer to Beaufort County Right of Way Acquisition Plan. Page 113 of 194 Beaufort County Standards & Specifications Page 38 Standard lane width is 10’ but the minimum allowed shall be 9’ for a multilane roadway. All roads shall include adequate area for the turnaround of emergency vehicles. The proposed road improvements shall comply with any and all appropriate design criteria for the prevailing road use and nature of traffic. The design and construction will also have to be in compliance with the current edition SCDOT Standard Specifications and the current edition of the Manual on Uniform Traffic Control Devices and all SCDOT Supplements. The County utilizes as appropriate the SCDOT specifications as part of the construction requirements for all County roadways. Right of Way Requirements: A 50’ right of way is required for a standard roadway. Below are design variances to be permitted only as approved by the Beaufort County Engineering Director based on available right of way. 20’ ROW Pervious Paving Asphalt Concrete Geocell 30’ ROW Asphalt/Microsurface/Chipseal Single slope with ditching Cub and Gutter Valley Gutter 40’ ROW and greater Asphalt/Microsurface/Chipseal Regular crown with ditching Construction Standard Practices: The contractor shall have approved third party quality control testing throughout the project. Page 114 of 194 Beaufort County Standards & Specifications Page 39 Beaufort County may provide approved third-party quality assurance testing and inspections. Testing shall adhere to SCDOT specifications with the following exceptions: Subgrade Proofroll the subgrade in accordance with section 211 of the SCDOT Standard Specifications. Provide Nuclear Gauge Density Test SC-29 &30, approximately every 500’ staggering the test from left-center- right-center-left with a minimum 5 tests per road. Subgrade shall be compacted to a minimum of 95% density. Aggregate Base Proofroll the base in accordance with section 211 of the SCDOT Standard Specifications. Provide nuclear gauge density test SC-T-30 approximately every 500’ staggering the test from left-center-right- center-left with a minimum of 5 tests per road. Base shall be compacted to a minimum density of 98% density. Laboratory proctor of aggregate base shall be used as comparison using ASTM D1557. Asphalt Asphalt QA/QC shall follow SCDOT standards. Contractor shall submit all test reports and accompanying load tickets to the Beaufort County Engineering Department within 48 hours of the work being completed. Forms to include 400.1, 400.2, 400.4, and AS1. The paving schedule during the calendar year shall be based on local conditions, engineering considerations and environmental considerations. Striping and signage shall follow Beaufort County Standards, SCDOT standards and the Manual of Uniform Traffic Control Devices (MUTCD). Alternative methods for dirt road improvements shall be at the discretion of the Beaufort County Engineering Director based on available right of way, roadway usage, traffic volume, and other design considerations. Page 115 of 194 Beaufort County Standards & Specifications Page 40 CHAPTER 14. RIGHTS OF WAY 14.1 OPEN SECTION Definitions ADT (Average Daily Traffic). The average number of vehicles per day that pass over a given point. Access. A way or means of approach to provide vehicular or pedestrian entrance or exit to a property. Access Classification. A ranking system for roadways used to determine the appropriate degree of access management. Factors considered include functional classification, the appropriate local government's adopted plan for the roadway, subdivision of abutting properties, and existing level of access control. Access Connection. Any driveway, street, turnout, or other means of providing for the movement of vehicles to or from the public roadway system. Access Management. The process of providing and managing access to land development while preserving the regional flow of traffic in terms of safety, capacity, and speed. Access Road. A street designed to provide vehicular access to abutting property and to discourage through traffic. Alley. A public or private street designed to serve as secondary access to the side or rear of those properties whose principal frontage/access is on another street. Applicant. Any authorized agent, entity, or person(s) submitting an application for development. Arterial Street. Carry longer-distance major traffic flows between important activity nodes. Conveys traffic between nodes. They are designed to provide high-speed, high-level service for efficient movement of people and goods. As-built. A map, plan, or layout showing the location and boundaries of land including existing utility lines and facilities. Berm. A mound of soil, either natural or man-made, intended to buffer land uses or limit access. Bike path. A surfaced or unsurfaced path designated for use by non-motorized cycles. Bikeway. A surfaced pathway designed to be used by non-motorized cycles along the edge of an existing street. Block. A parcel of land entirely surrounded by streets or highways, railroad right-of-way, waterways, subdivision boundary, or by a combination thereof. Buffer. An area within a property or site, generally adjacent to and parallel with the property line, either consisting of natural vegetation or created by the use of trees, shrubs, and/or berms, designed to continuously limit the view and Page 116 of 194 Beaufort County Standards & Specifications Page 41 sound from the site to adjacent sites or properties. Building Line. That line which represents the distance that a building or structure must be setback from a lot boundary line or a street right-of-way line, according to the terms of these regulations or the Zoning Ordinance. In all cases, the building lines of a lot shall run parallel to and setback the appropriate distance as required by the zoning district in which the lot is located from street right-of-way lines, street center lines, or other boundary lines. Collector Street. Link local streets with the arterial street system. They collect traffic in local areas and provide the connection to arterial streets. They may also directly serve abutting land uses. Common Area. (See Open Space—Common). Competent Person. An individual with the necessary training and experience to identify potential hazards within a work zone, understand traffic control procedures, and have the authority to take corrective actions to ensure the safety of workers and the public during construction or maintenance activities on a roadway. Connection Spacing. The distance between connections, measured from the centerline of the first connection to the centerline of the second connection along the edge of the traveled way. Corner Clearance. The distance from an intersection of a public or private road to the nearest access connection, measured from the centerline of the closest edge of the pavement of the intersecting road to the centerline of the closest edge of the pavement of the connection along the traveled way. Cross Access Easement. A non-exclusive easement in which a service drive is located that provides vehicular access between two or more contiguous sites, so the driver need not enter the public street system. Cul-de-sac. A local street with only one access point and having the other end designed for the reversal of traffic movement. Culvert. A structure designed to convey a watercourse, not incorporated in a closed drainage system, under a road, railway, or pedestrian walk. Curb. A vertical or upward sloping edge of a roadway usually made of concrete or paving materials. Density. The permitted number of dwelling units per acre of land to be developed. Design Standards. Standards that set forth specific improvement requirements as well as layout criteria. Page 117 of 194 Beaufort County Standards & Specifications Page 42 Detention Basin. A pond, pool, or basin used for the storage of water runoff and the controlled release of such runoff or as otherwise defined in SOLOCO. Developer. The legal or beneficial owner(s) of a lot of any land included in a proposed development. Also, the holder of an option or contract to purchase, or any other person having enforceable proprietary interest in such land. Divided Street. Streets that have an island, median, or other street barrier separating moving lanes. Driveway. A paved or unpaved area used for ingress or egress of vehicles and allowing access from a street to a building or other structure or facility. Driveways are not inclusive of public or private roads constructed in accordance with the design standards found in these regulations. Easement. A grant of one or more property rights by a property owner to or for use by any person, firm, corporation, the public, or another person or entity. Not inclusive of fee simple ownership. Encroachment. Any obstruction in a delineated right-of-way or easement. Engineer. A registered professional in good standing with the South Carolina Board of Registration for Professional Engineers and Land Surveyors. Entranceway treatments. (See Open Space—Common). Floodplain. Areas subject to periodic flooding which are shown on maps prepared by the Federal Emergency Management Agency (FEMA) for Beaufort County and are maintained by the Beaufort County Flood Control Officer. Floodway. The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot. Frontage. See Lot Frontage. Frontage Road. A public or private drive that generally parallels a public street between the right-of-way and the front building setback line. The frontage road provides access to adjacent properties while separating them from the arterial street. Functional Classification. A system used to group public roadways into classes according to their purpose in moving vehicles and providing access. Governing Authority. The Beaufort County Council having jurisdiction in the area and matter involved. Grade. The slope of a street, public way, or other land, specified in percentage (%) terms. Greenways. (See Open Space—Recreational). Gutter. A shallow channel usually set along a curb or the pavement edge of a road for purposes of catching and carrying off runoff water. Page 118 of 194 Beaufort County Standards & Specifications Page 43 HOA (Homeowner's Association). A group of property owners, established by legal documents, charged with the management of a development, typically having the right to assess fees. Intersection. A point where two or more roads cross at a grade. Island. In street design, a raised curbed area placed to guide traffic and separate lanes or used for landscaping, signage, or lighting. Joint Access (or Shared Access). A driveway connecting two (2) or more contiguous sites to the public/private street system. Land Contract Sale Parcel. A parcel created through a contractual agreement in which no deed to transfer ownership occurs until the agreed upon purchase price has been paid in full. The purchaser may or may not be responsible for the property taxes of the parcel. Land Development. A change in land characteristics through redevelopment, construction, subdivision into parcels, condominium complexes, apartment complexes, commercial parks, shopping centers, industrial parks, manufactured housing communities, or other developments for sale, lease or any combination of owner and rental characteristics. Renovations, expansions, or up fittings of existing structures shall not be considered a land development. Lease Parcel. A parcel created for lease, rental, or contractual purposes, and for which the ownership does not change. Local Street. The lowest order of residential street (See Street Hierarchy). Provides frontage for access to lots and carries traffic having destination or origin on the street itself. Designed to carry traffic at slow speeds. Lot. A piece, parcel, tract, or plot of land intended as a unit for building development or other purpose, for sale, rent, or lease. Lot, Corner. Any lot having at least two contiguous sides abutting one or more streets, provided that the interior angle at the intersection of such two sides is less than 135 degrees. Lot Depth. The average distance measured from the front lot line to the rear lot line. Lot, Flag. A large lot not meeting the minimum frontage requirements specified in the Beaufort County Zoning Ordinance and where access to the public road is by a narrow, private easement or driveway. Lot, Nonconforming. A lot that does not meet the dimensional requirements of the district in which it is located and that existed before the requirement of the zoning ordinance became effective. Lot, Through (double frontage lot). A lot that fronts upon two parallel streets or road rights-of-way; or, that fronts upon two streets or road rights-of-way that do not intersect at the boundaries of the lot. Lot Frontage. That portion of a lot extending along a street right-of-way line. Page 119 of 194 Beaufort County Standards & Specifications Page 44 Lot of Record. A lot or parcel that exists as shown or described on a plat or deed in the records of the Register of Deeds Office. Lot Size. The size of a lot measured within the lot lines and expressed in terms of acres or square feet. Lots created through the development of land shall meet the minimum size requirements as specified in the zoning ordinance. Lot Width. The horizontal distance between side lot lines measured parallel to the front lot line at the minimum required front setback line as defined in the Zoning Ordinance. Major Development. Developments requiring formal review and approval of the Beaufort County Planning Commission. Major developments include the following: a. The creation or extension of any new public street. b. The creation of a private street greater than 1,800 feet is utilized to obtain access. c. The creation of more than ten lots/units (including the parent tract) regardless of whether adequate access already exists. d. Group developments such as apartment, condominium, and townhouse complexes. e. Any commercial, industrial, or office land development, of regional significance, on a single tract or parcel of land that will produce an estimated 5,000 or more average daily trips according to trip generation rates established by the Institute of Transportation Engineers and established in the current issue of the ITE Trip Generation Manual. f. Any portion of a Planned Development District. Manufactured Home Development. Development of a lot or parcel for the purposes of locating manufactured housing for the purposes of lease, rental, or sale. Such development shall comply with all platting and improvement requirements of Articles 2, 3, 4, and 6. Median. A barrier placed between lanes of traffic flowing in opposite directions. Median Island. An island in the center of a street that separates opposing traffic flows. Minor Development. 1. Subdivisions or developments containing no more than ten lots/units (including the parent tract) where access to a public or private street exists or where a new private street of less than 1,800 feet is constructed to obtain access. 2. Any commercial, industrial, or office development on a single tract or parcel of land that will produce between 1,000 and 5,000 average daily trips according to trip generation rates established by the Institute of Transportation Engineers and established in the current issue of the ITE Trip Generation Manual. Natural water bodies. (See Open Space—Recreation). Off-street Parking Space. A parking space provided outside of street right-of-way such as a parking lot, parking structure, or private driveway. On-street Parking Space. A parking space that is located within a dedicated street right-of-way. Page 120 of 194 Beaufort County Tra￿c Signal Guidelines 45 Open Space—Common. Improved areas within a land development set-aside for use by all residents in the community. Common open spaces may include the following: a. Entranceway Treatments— Areas in the development facing an exterior street in which signs are placed next to an interior street to inform motorists of the name of the development. b. Wetlands— Wetlands include swamps, marshes, bogs, and similar areas as determined by the appropriate regulatory agency. c. Open Space—Recreational. Areas designed for active or passive uses that are planned, improved, accessible, and useable by persons living within a development. Recreational open spaces may include the following: d. Amenities Areas— Areas within a development in which impervious surfaces are added to provide recreational opportunities. Amenities areas may include but are not limited swimming pools, tennis courts, racquetball courts, and shuffleboard courts. e. Greenways— Open spaces designed to incorporate natural settings such as creeks and significant stands of trees within neighborhoods that are entirely within a development and do not abut the exterior boundary of the property. Greenways may be used for certain active uses such as walking, jogging, or bicycling. A greenway differs from a park or square in that their detailing is natural and/or informally planted except along right-of-way and may contain irregular topography. f. Natural or Man-made Water Bodies— Any bay, lake, pond, or river greater than three acres in size and created by nature. g. Playgrounds— Playgrounds provide sunny and shaded areas for children as well as open shelter with benches for parents. Playgrounds may be built within parks or may stand alone within a residential block. h. Playfields— Playfields provide areas designed for a variety of sports/athletic activities in which specific field/ play area dimensions are required. Playfields usually include fields for softball, soccer, baseball/t - ball, football, and/or volleyball. i. Plaza— A plaza is an open area adjacent to, or part of, a civic building or facility. Plazas function as gathering places and may incorporate a variety of non-permanent activities such as vendors and display stands. Plazas may be left unplanted and may incorporate impervious surfaces. j. Park— Parks may be designed for passive and/or active recreational uses that create a central space that serves an entire neighborhood or group of neighborhoods. Parks may incorporate physical features that are an asset to the community such as lake or river frontage, high ground, or significant stands of trees. k. Picnic Areas— Areas designed for an outing or excursion in which those taking part share a meal in an area in which the land has been only minimally developed. Picnic areas include tables that may be covered and screened to provide shelter from inclement weather and insects and may include grilles for cooking. l. Squares— Squares are areas for passive recreational use. Squares are bounded completely by streets. A square allows for informal gatherings or child play. They must be improved open space but Page 121 of 194 Beaufort County Tra￿c Signal Guidelines 46 cannot be covered with impervious materials. m. Village Green— Open space which serves as the focal point for a development. Village greens are typically bounded by streets and contain planted areas. The village green may contain a monument or gazebo and have civic buildings (churches, community centers, and government buildings) located around the perimeter of the green. Open Space, Improved. Cleared of underbrush and debris. Out-parcel. Any lot created from an overall tract wherein the remaining tract is larger than any single lot created and wherein the conditions and locations of access to such lot from a public highway or street may be restricted and/or provided through easements granted by the larger tract holder. Parcel Split. A lot created through the subdivision of property into two or more parcels, lots, or tracts. Parent Tract. The original lot, parcel, or tract of land as established in the Beaufort County Assessor's records, from which the proposed subdivided lot(s), will be split. For the purposes of determining minor or major development status, a parent tract is reviewed to determine the total number of parcel splits within a ten-year period. Park. (See Open Space—Recreational). Parking Lane. A lane usually located on the sides of streets, designed to provide on-street parking for vehicular traffic. Parking Space. An area provided for the parking of a motor vehicle. Picnic area. (See Open Space—Recreational). Plat. A map or drawing upon which a developer's plan of the subdivision of property is presented for approval. Platting Action. Plats prepared for the purposes of displaying changes to property that are required to be recorded as legal documents with the Register of Deeds Office and require the review and approval of the Beaufort County Planning Department. Submittal requirements for such plats are found on the Beaufort County website under the Register of Deeds. Playfields. (See Open Space—Recreational). Playgrounds. (See Open Space—Recreational). Plaza. (See Open Space—Recreational). Private Road. Any road or thoroughfare for vehicular travel which is privately owned and maintained, and which provides the principal means of access to abutting properties. Public Road. A road under the jurisdiction of a public body. Reserve Strip. A strip of property directly adjacent to an abutting property line. The property cannot be classified as a Page 122 of 194 Beaufort County Tra￿c Signal Guidelines 47 building lot, utility easement, open space, recreation space or buffer yard. Retention Basin. A pond, pool, or basin used for the permanent storage of water runoff or as otherwise defined in SOLOCO. Right-of-Way. Land reserved, used, or to be used for a highway, street, alley, walkway, drainage facility, or other public purpose. Except for existing county roads located on prescriptive easements, right-of-way as defined herein are characterized by fee-simple ownership. For roads maintained by the county without fee simple ownership, the right- of-way shall be measured from the point of the ditch farthest from the centerline of the road. Setback. The perpendicular distance between the property line and the primary structure and the right-of-way or easement line. Setbacks for structures shall be as defined in the Beaufort County Zoning Ordinance. Shoulder. The graded part of the right-of-way that lies between the edge of the main pavement or curb line and the right-of-way line or ditch. Sidewalk. A paved path provided for pedestrian use and usually located at the side of the road within the right-of-way. Sight Triangle. A triangular shaped portion of property included within the right-of-way and established at street intersections in which nothing is erected, placed, planted, or allowed to grow in such a manner as to limit or obstruct the sight distance of motorists entering or leaving the intersection. Sight triangles shall adhere to the requirements established in the most current edition of the SCDOT Highway Design Manual. Site Plan. An accurately scaled development plan that illustrates the existing conditions on a land parcel as well as depicting details of a proposed development. Sketch Plan. A site plan of sufficient accuracy to illustrate a potential development activity. Storm Water Detention. A provision for storage of storm water runoff and the controlled release of such runoff after a flood or storm. Street Hierarchy. The conceptual arrangement of streets based on function. A hierarchical approach to street design classifies streets according to function, from high-traffic arterial roads down to streets whose function is residential access. Systematizing street design into a road hierarchy promotes safety, efficient land use, and environmental quality. Stub-out (Stub-street). A portion of a street or road used as an extension to an abutting property that may be developed in the future. May be permitted when a development is phased over a period of time, but only if the street in its entirety has been approved in the preliminary plan. Subcollector Street. Middle order of residential streets (See Street Hierarchy). Provides frontage for access to lots and carries traffic of adjoining residential access streets. Traffic should have origin or destination in the immediate neighborhood. Subdivision. The division of a tract or parcel of land into two or more lots, building sites, or other divisions for the purpose, whether immediate or future, of sale, lease, or building development, and includes all division of land involving a new street or change in existing streets, and includes re-subdivision which would involve the further division or relocation of lot lines of any lot or lots within a subdivision previously made and approved or recorded according to law; or, the alteration of any streets or the establishment of new streets within any subdivision previously Page 123 of 194 Beaufort County Tra￿c Signal Guidelines 48 made and approved or recorded according to law, and includes combinations of lots of record; however, the following exceptions are included within this definition only for the purpose of requiring that the local planning agency be informed and have a record of the subdivisions: a. Combining or re-combining portions of previously platted lots where the total number of lots is not increased and the resultant lots are equal to the ordinance standards. b. Dividing land into parcels of five acres or more where no new street is involved. The Planning Commission must receive plats of these exceptions as information and indicate that fact on the plats. c. Combining or re-combining entire lots of record where no new street or change of existing street is involved. Surveyor. A registered land surveyor in good standing with the South Carolina Board of Registration for Professional Engineers and Land Surveyors. Trip. A single or one-way vehicle movement to or from a property or study area. Utility Coordinating Committee (UCC). A group of representatives from private and public agencies involved in the development process. Wetland. Wetlands include swamps, marshes, bogs, and similar areas as determined by applicable regulatory agencies. Yard. A space on the same lot with a principal building, open, unoccupied, and unobstructed by buildings or structures from ground to sky except where encroachments and accessory building and structures are expressly permitted. Yard, Front. A yard situated between the front building line and the front lot line extending the full width of the lot. Zoning Ordinance. Refers to the Beaufort County Zoning Ordinance. Page 124 of 194 Beaufort County Tra￿c Signal Guidelines 49 References Charleston County, South Carolina. Zoning and Land Development Regulations (ZLDR). Horry County, South Carolina. 2001. Horry County Land Development Regulations. Lexington County, South Carolina. 2022. Land Development Manual South Carolina Department of Transportation (2008 Edition). Access and Roadside Management Standards. South Carolina Department of Transportation (2021). Standard Drawings. https://www.scdot.org/business/standard-drawings.html South Carolina Department of Transportation (2025). Standard Specifications for Highway Construction. Hodgins, B., G. Hoffmann, and K. Ellis. 2020. “Southern Lowcountry Stormwater Design Manual, Stormwater Best Management Practices”. Beaufort, SC. Page 125 of 194 Beaufort County Tra￿c Signal Guidelines 50 Beaufort County Traffic Signal Guidelines January 2026 Page 126 of 194 Beaufort County Tra￿c Signal Guidelines 51 PURPOSE The purpose of this guide is to clarify expectations regarding signal design in Beaufort County. It is intended as a supplement to the following references. These references provide additional details and should be considered guiding documents that govern this supplement. The signal designer is responsible for complying with the most current version of each reference. References South Carolina Department of Transportation (SCDOT) Traffic Signal Design Guidelines, latest version SCDOT Signal Design Specifications, latest version Manual on Uniform Traffic Control Devices (MUTCD), latest version South Carolina Roadway Design Manual, latest version INTRODUCTION Traffic signals in Beaufort County may be owned by SCDOT, Beaufort County, City of Beaufort, or Town of Hilton Head Island. The SCDOT-owned traffic signals are maintained by Beaufort County, City of Beaufort, or Town of Hilton Head Island through respective Signal Maintenance Agreements with SCDOT. In addition to the Beaufort County assigned traffic signals, there are some additional traffic signals outside of Beaufort County that are maintained by Beaufort County on behalf of SCDOT as part of the Beaufort County/SCDOT Signal Maintenance Agreement. This maintenance agreement also includes school flashers, pedestrian hybrid beacons, and other sign flashers. Figure 1 (North of Broad River), Figure 2 (South of Broad River), and Figure 3 (City of Beaufort/Port Royal) show the locations of traffic signals in Beaufort County and the maintaining agency (City of Beaufort, Beaufort County or SCDOT). Town of Hilton Head traffic signals are not shown. Table 1 lists the Beaufort County-owned traffic signals and the traffic signals maintained by Beaufort County as part of the Beaufort County/SCDOT Signals Maintenance Agreement. This list is subject to change based on changes to the Beaufort County/SCDOT Signals Maintenance Agreement and/or any new traffic signal installations on the Beaufort County roadway system. Page 127 of 194 Beaufort County Tra￿c Signal Guidelines 52 Table 1: Beaufort County Owned or Maintained Traffic Signals Signal ID Number Location Beaufort County Owned Signals 101 US 17 at Big Estate Rd./Jacob White Rd. 103 May River Rd. at Buck Island Rd. 104 SC 46 at Sams Club/ Kitties Crossing 205 Buckwalter Parkway at Buckwalter Place Blvd. X 206 Buckwalter Parkway at Bluffton Parkway (N) X 207 Buckwalter Parkway at Lake Point Dr. X 208 Buckwalter Parkway at Bluffton Parkway (S) X 210 Buckwalter Parkway at McCracken Circle (S) X 212 Buckwalter Parkway at May River Rd. X 304 Bluffton Parkway at River Ridge Rd./ Flat Creek Dr. X 303 Bluffton Parkway at Hampton Parkway X 309 Bluffton Parkway at Buck Island Rd. X 310 Bluffton Parkway at Masters Way/ Crossings Blvd. X 311 Bluffton Parkway at Simmonsville Rd. X 313 Bluffton Parkway at Red Cedar St. X 315 Bluffton Parkway at Burnt Church Rd. X 317 Bluffton Parkway at Tanger Outlets 1 X 318 Bluffton Parkway at Malphrus Rd. X 321 Bluffton Parkway at Buckingham Plantation Dr. X 402 US 278 at I-95 SB Ramps 404 US 278 at Medical Center Dr. 405 US 278 at Lakeside Blvd. N/Latitude Blvd. 411 US 278 at D. Mark Cummings Rd. 414 US 278 at Sun City Blvd. 415 US 278 at Palmer Grace Dr. W/ Okatie Center Blvd. S 416 US 278 at Hampton Parkway 417 US 278 at Buckwalter Parkway 418 US 278 at St. Gregory Dr. Page 128 of 194 Beaufort County Tra￿c Signal Guidelines 53 420 US 278 at Rose Hill Way/Whiteoaks Cir 421 US 278 at Belfair Oaks Dr./ Buck Island Rd. 422 US 278 at Belfair Village Dr./ S-474 (Simmonsville Rd.) 423 US 278 at SC 46 (Bluffton Rd.)/ Crescent Dr. 424 US 278 at Target 425 US 278 at Burnt Church Rd./ Trimblestone Rd. 426 US 278 at Sawmill Creek Rd. 427 US 278 at Malphrus Rd./ Colleton River Dr. 428 US 278 at Buckingham Plantation Dr./ Moss Creek Dr. 551 SC 170 at Snake Rd./ Callawassie Dr. 6800 SC 170 at SC 462 556 SC 170 at Oldfield Way/ E Argent Pkwy 557 SC 170 at Argent Blvd. 559 SC 170 at Cherry Point Rd./ Pearlstine Dr. 561 SC 170 at Tidewatch Dr. 567 SC 170 at US 278 WB Off-Ramp 569 SC 170 at Sun City Blvd. 570 SC 170 at Bluffton Parkway 571 SC 170 at Mill Creek Rd./ Gibbet Rd. 619 US 21 at Midtown Dr./Wrights Point Dr. 620 US 21 at SC 128 (Savannah Hwy.) 908 US 21 at Airport Circle 911 US 21 at Polowana Rd. 912 US 21 at S-7-45 *Subject to change Page 129 of 194 Beaufort County Tra￿c Signal Guidelines 54 GENERAL PROCESS The following section outlines the general process that should be followed in Beaufort County for new signal installations or upgrades to existing signal installations. Signals maintained by the City of Beaufort or the Town of Hilton Head Island are not included in these specifications; those locations should be coordinated directly with municipal signals staff. Signals on SCDOT Roadways Coordination with both SCDOT and Beaufort County should occur early in the design process. Approved traffic signal warrant analysis and SCDOT traffic signal concurrence letter shall be provided to Beaufort County staff. Per County Council, all new traffic signals should be mast arm installations. This requirement may be waived by the Engineering Director or his/her designee. Due to the long lead time to order mast arm poles, installation of a temporary span wire signal may be required. This should be coordinated with SCDOT and Beaufort County. Beaufort County and SCDOT should be invited to the pole siting meeting to provide input on the preliminary pole locations. Subsurface utilities shall be marked prior to the pole siting meeting. Potential utility conflicts should be reviewed. At the pole siting meeting special considerations such as County preference items to include based on location, timing plans to be completed, type of detection, etc. should be discussed. A follow-up meeting regarding any special considerations for the intersection should be scheduled if these are not addressed at the pole siting meeting. A left-turn phasing memo shall be prepared and submitted to Beaufort County and SCDOT based on SCDOT Traffic Signal Guidelines. Phasing approval letter from SCDOT shall be provided. Draft traffic signal plans shall be provided to Beaufort County and SCDOT for review and comment. Recommended signal timing including recommended cycle and split information should be submitted for review to Beaufort County and SCDOT. Traffic Signal Plan Review Packages should include the following: Draft Traffic Signal Plan Clearance Calculations Worksheet (Consultant is responsible for clearance calculations) Clearance Calculations Sketch (Consultant is responsible for clearance calculations) Approved traffic signal warrant analysis Phasing Memo for left-turn arrow considerations Page 130 of 194 Beaufort County Tra￿c Signal Guidelines 55 Recommended signal timing Any special considerations Page 131 of 194 Beaufort County Tra￿c Signal Guidelines 56 Once draft traffic signal design plans are approved by SCDOT and Beaufort County, the approved signed and sealed traffic signal plans should be provided to the Beaufort County Signals Manager with the expected construction time frame. Beaufort County Signals Manager should be invited to the Pre-construction meeting for the project. At the cost of the developer, an IMSA Level II Field inspector must inspect the installation and provide a letter of certification for the installation to Beaufort County. Beaufort County Signals staff (and SCDOT staff, as appropriate) should be scheduled by the developer to be on-site for the following construction milestones. A minimum of 48 hours’ notice is required. Pole installation Cabinet wiring completion Turn on Beaufort County will not be responsible for programming of the controller or for entry of new timing plans. Beaufort County will not be responsible for the installation of detection systems. SCDOT Signal installation guidelines should be followed in coordination with Beaufort County SCDOT Signal Activation guidelines should be followed in coordination with Beaufort County. Current guidelines are listed below but are subject to change. Install [type of pole], including signal head connections, but do not install signal heads until ready to place in flashing mode. Install controller cabinet, set up [type of detection] and complete incidental work necessary to place signal in flashing mode. On the day the signal is to be placed in stop and go operation, erect W3-3 “SIGNAL AHEAD” signs with W16-14P “NEW” plaques and orange flags on all approaches. Signs shall be placed at least [distance] feet ahead of the stop bar on the [approach]. *Note distance for all approaches. Place signal in flash for 5-7 days to include a weekend prior to full activation. After two months, remove signal ahead sign assembly from all approaches. Signals on Beaufort County Roadways Page 132 of 194 Beaufort County Tra￿c Signal Guidelines 57 Traffic signal warrant analysis results shall be submitted to Beaufort County staff. Traffic signal installation concurrence shall be provided by the Director or his/her designee. Coordination with Beaufort County should occur early in the design process Per County Council mandate, all new traffic signals should be mast arm installations. This requirement may be waived by the Engineering Director or his/her designee. Due to the long lead time to order mast arm poles, installation of a temporary span wire signal may be required. This should be coordinated with Beaufort County. Beaufort County should be invited to the pole siting meeting to provide input on the preliminary pole locations. Subsurface utilities shall be marked prior to the pole siting meeting. Potential utility conflicts should be reviewed. At the pole siting meeting special considerations such as County preference items to include based on location, timing plans to be completed, type of detection, etc. should be discussed. A follow-up meeting regarding any special considerations for the intersection should be scheduled if these are not addressed at the pole siting meeting. A left-turn phasing memo shall be prepared and submitted to Beaufort County based on SCDOT Traffic Signal Guidelines. Phasing approval letter from SCDOT shall be provided. Left-turn phasing shall be discussed with Beaufort County staff. Draft traffic signal plans shall be provided to Beaufort County staff for review and comment. A copy of the draft traffic signal plans should be provided to SCDOT for their courtesy review and comment. Signal timing information including recommended cycle and split information should be submitted for review to Beaufort County. Traffic Signal Plan Review Packages should include the following: Draft Traffic Signal Plan Clearance Calculations Worksheet (Consultant is responsible for clearance calculations) Clearance Calculations Sketch (Consultant is responsible for clearance calculations) Approved traffic signal warrant analysis Phasing Memo for left-turn arrow considerations Recommended signal timing Page 133 of 194 Beaufort County Tra￿c Signal Guidelines 58 Any special considerations Once draft traffic signal design plans are approved by Beaufort County, the approved signed and sealed traffic signal plans should be provided to the Beaufort County Signals Manager with the expected construction time frame Beaufort County Signals Manager should be invited to the Pre-construction meeting for the project. An IMSA Level II Field inspector must inspect the installation and provide a letter of certification for the installation to Beaufort County. Beaufort County Signals staff should be scheduled by the developer to be on-site for the following construction milestones. A minimum of 48 hours’ notice is required. Pole installation Cabinet wiring completion Turn on Beaufort County will not be responsible for programming the controller or entry of new timing plans. Beaufort County will not be responsible for the installation of detection systems. 16. SCDOT Signal Activation guidelines should be followed in coordination with Beaufort County. Current guidelines are listed below but are subject to change. Install [type of pole], including signal head connections, but do not install signal heads until ready to place in flashing mode. Install controller cabinet, set up [type of detection] and complete incidental work necessary to place signal in flashing mode. On the day the signal is to be placed in stop and go operation, erect W3-3 “SIGNAL AHEAD” signs with W16-14P “NEW” plaques and orange flags on all approaches. Signs shall be placed at least [distance] feet ahead of the stop bar on the [approach]. *Note distance for all approaches. Place signal in flash for 5-7 days to include a weekend prior to full activation. After two months, remove signal ahead sign assembly from all approaches. Page 134 of 194 Beaufort County Tra￿c Signal Guidelines 59 REQUIREMENTS General requirements for traffic signal installation in Beaufort County are as follows: Materials: All designs (including foundations) shall meet current SCDOT standards and shall be stamped and sealed by a South Carolina registered professional engineer. All materials, unless otherwise approved, shall be included on the SCDOT QPL. Inspections during construction shall be provided by a third-party inspector (with a minimum of IMSA Level II certification). Mast Arm Details: Vertical support shall be fluted, unless approved by Beaufort County Horizontal mast arm shall be smooth and straight Nut covers shall be used in lieu of decorative base Finish shall be powder coated black Poles shall be ordered in increments of 5-feet ranging from 25-feet to 60-feet. Traffic signal head mountings shall be rigid via astro-brackets. Overhead street name signs shall be installed between signal heads with standard 8” lettering. Note: While the attached design detail is provided by Valmont, an alternate manufacturer may be used provided that the specifications provided within this document and detail are met to the satisfaction of Beaufort County and SCDOT. Design Review: Prior to ordering of any poles, designs shall be submitted and reviewed by Beaufort County engineering staff and SCDOT staff (as appropriate) for approval. The following items shall Page 135 of 194 Beaufort County Tra￿c Signal Guidelines 60 be included in the initial permit package and contractor package submittal. Typically, the initial permit package is completed by the design engineer, and the contractor package submittal is prepared by the selected contractor. Initial Permit Package: Traffic Signal Plan signed and sealed by a South Carolina professional engineer Approval of traffic signal plan by SCDOT or Beaufort County (as appropriate) Supplemental Construction Package: Foundation design details and calculations adequate for local soil types signed and sealed by a South Carolina professional engineer. Testing requirements should be confirmed during the pre-construction meeting Completed SCDOT “Mast Arm Information Form” Completed SCDOT “2001 AASHTO Design Specifications Form” Specifications and Catalog cuts package along with equipment and warranty materials Traffic control plan as appropriate SCDOT Permit SPECIAL MATERIALS The following notes the special materials and considerations in Beaufort County. Detection and Communications Systems must be compatible with adjacent intersections. The type of video or radar detection used must be approved by the Beaufort County Signals Manager. Video Detection – Video detection can be considered for signal installation with the approval of SCDOT. A video detection trained traffic signal contractor shall be used for all video system installations and programming. Beaufort County is not responsible for programming detection zones; however, the contractor shall review the detection zones with Beaufort County signals staff and the IMSA Level II inspector during the close-out process. See SCDOT Signal Design Specifications Radar Detection – Radar detection can be considered for signal installation with the approval of SCDOT. A radar detection trained traffic signal contractor shall be used for all Page 136 of 194 Beaufort County Tra￿c Signal Guidelines 61 radar system installations and programming. Beaufort County is not responsible for programming detection zones; however, the contractor shall review the detection zones with Beaufort County signals staff and the IMSA Level II inspector during the close-out process. See SCDOT Signal Design Specifications Central Control Communication – Central Control Communication should be installed at each location. The specifics should be coordinated with Beaufort County staff. Street Lights and Luminaires – Street lighting and luminaire fixture types will be reviewed on a case-by-case basis during the signal design review. In the event that street lighting is required, the lighting structure shall be Holophane or equivalent as depicted in the attached detail. Lighting fixtures shall be specified by Beaufort County Traffic Engineering for highway lighting or by Beaufort County or the appropriate municipality for street lighting. Emergency Management Equipment – During the review process, Beaufort County may specify locations for Emergency Management equipment (cameras, etc.) that shall be specified on the plans. MAINTENANCE Beaufort County and SCDOT staff will review the installation of the traffic signal as appropriate. During the pre-construction meeting, Beaufort County and SCDOT staff shall establish the milestones during the project that need to be observed and/or approved by Beaufort County and SCDOT staff. The contractor shall provide 48 hours’ notice of such activities or other notification time frame established in the pre-construction meeting. Page 137 of 194 Resolution NO. 2026/ XX A RESOLUTION OF THE BEAUFORT COUNTY COUNCIL ADOPTING UPDATED ROAD CONSTRUCTION AND DESIGN STANDARDS FOR ROADS WITHIN BEAUFORT COUNTY, SOUTH CAROLINA; ESTABLISHING MINIMUM ENGINEERING, CONSTRUCTION, INSPECTION, AND ACCEPTANCE REQUIREMENTS; AND PROVIDING FOR IMPLEMENTATION AND ADMINISTRATION. WHEREAS, Beaufort County Council recognizes that safe, reliable, durable, and properly constructed roads are essential to the health, safety, welfare, economic development, and quality of life of the residents and visitors of Beaufort County; and WHEREAS, the continued growth and development of Beaufort County necessitates consistent, modern, and enforceable road construction standards to ensure that new roads and roadway improvements are designed and constructed to appropriate engineering standards; and WHEREAS, inconsistent road construction practices, inadequate drainage infrastructure, insufficient pavement design, and deficiencies in roadway construction can result in premature road deterioration, increased maintenance expenses, flooding, traffic safety concerns, and unnecessary financial burdens on County taxpayers; and WHEREAS, Beaufort County Council desires to establish uniform minimum standards governing road design, construction materials, pavement thickness, roadway drainage, grading, rights-of-way, sidewalks, shoulders, curbing, traffic control devices, and related infrastructure; and WHEREAS, South Carolina Code of Laws Section 57-17-10 provides for County supervision and control of public roads under the jurisdiction of the County; and WHEREAS, South Carolina Code of Laws Section 57-3-600 establishes requirements that must be satisfied before a county may accept a deed to a newly constructed road or agree to maintain such a road, including compliance with applicable construction specifications and standards; and WHEREAS, Beaufort County currently maintains policies and procedures governing road acceptance, maintenance responsibilities, and roadway infrastructure, and County Council finds that adopting updated and comprehensive construction standards will further strengthen the County's ability to protect public infrastructure and ensure responsible use of public resources; and WHEREAS, the County desires to coordinate its road construction standards with applicable South Carolina Department of Transportation (SCDOT) specifications, applicable federal requirements, and generally accepted professional engineering practices, while recognizing the respective jurisdictional authority of the County, SCDOT, municipalities, and other governmental agencies; and WHEREAS, County Council finds that the adoption of uniform road construction standards serves the public interest by improving roadway safety, enhancing infrastructure Page 138 of 194 Resolution NO. 2026/ XX durability, promoting responsible development, and reducing long-term public maintenance costs. NOW, THEREFORE, BE IT RESOLVED BY BEAUFORT COUNTY COUNCIL, in meeting duly assembled, adopts the Beaufort County Road Construction and Design Standards, attached hereto as Exhibit A and incorporated herein by reference, as the minimum standards applicable to County road construction, reconstruction, roadway improvement projects, and the consideration of newly constructed roads for acceptance into the County-maintained road system. Adopted this ____ day of __________, 2026. COUNTY COUNCIL OF BEAUFORT COUNTY BY: Alice Howard, Chairman ATTEST: _____ Sarah W. Brock, Clerk to Council Page 139 of 194 BEAUFORT COUNTY PUBLIC FACILITIES COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: APPROVAL OF A RESOLUTION TO REMOVE RILEY RD FROM THE 2018 SALES TAX PROJECT BROAD RIVER-RILEY RD SIDEWALK. MEETING NAME AND DATE: Public Facilities Committee November 16, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff Recommends approval of the resolution to remove the sidewalk along Riley Road from the Broad River- Riley Sidewalk project from the 2018 sales tax. PRESENTER INFORMATION: Bryan Bauer, Director of Engineering (5 min) ITEM BACKGROUND: In 2018, the citizens of Beaufort County voted to impose a 4-year, $120M referendum for transportation projects. The projects are as follows: US 278 Corridor Traffic Improvements, Lady’s Island Corridor Traffic Improvements, Sidewalks and Multi-Use Pathways. A resolution was passed by County Council updating the sales tax priorities based on updated collections and project estimates in July 2025. A sidewalk on Broad River Boulevard and Riley Road was included. A public meeting was held for the project on August 18, 2026, along with a corresponding virtual meeting. Those that commented were not in favor of a sidewalk on Riley Rd. Cost savings to remove the Riley Rd portion of the project is: Design no change since rework for plan and stormwater report revisions R/W Acquisition $47,110.00 Removes 3 tracts from the acquisition process Utilities $55,420.20 15% of construction Construction $369,468.00 Based on $225/LF for 0.311 miles of sidewalk CEI $55,420.20 15% of construction $527,418.40 FISCAL IMPACT: Based on not constructing this portion of the project, the net savings to the County will be $527,418.40 APPROVAL HISTORY: Page 140 of 194 In 2018, the citizens of Beaufort County voted to impose a 4-year, $120M referendum for transportation projects. The projects are as follows: US 278 Corridor Traffic Improvements, Lady’s Island Corridor Traffic Improvements, Sidewalks and Multi-Use Pathways. A resolution was passed by County Council updating the sales tax priorities based on updated collections and project estimates in July 2025. Page 141 of 194 Resolution NO. 2026/ XX A RESOLUTION TO REDEFINE THE PROJECT SCOPE FOR THE BROAD RIVER BOULEVARD – RILEY ROAD SIDEWALK PROJECT FROM THE 2018 TRANSPORTATION SALES TAX PROGRAM WHEREAS, On November 13 th 2017, by ordinance number 2017/34, Beaufort County Council ("County Council") adopted enabling legislation authorizing the levy and collection of a one-cent transportation sales tax; and WHEREAS, On November 6, 2018, the citizens of Beaufort County voted to impose a 4-year, $120M referendum for transportation projects. The projects included: US 278 Corridor Traffic Improvements, Lady’s Island Corridor Traffic Improvements, Sidewalks and Multi-Use Pathways; and WHEREAS, Resolution 2025/46 was passed by County Council on July 14, 2025 updating the sales tax priorities based on updated collections and project estimates in July 2025. A sidewalk on Broad River Boulevard and Riley Road was included; and WHEREAS, the Broad River Blvd-Riley Road project was reprioritized as: 1) A 5-foot concrete sidewalk beginning at Broad River Elementary School and extending along Broad River Boulevard. 2) Turns onto Riley Road and continues to the intersection with Fair Road, serving the Shadow Moss neighborhood; and WHEREAS, a public meeting for the Broad River Boulevard project was held on August 18, 2026 along with a corresponding virtual meeting; and WHEREAS, due to public comments, staff now recommends the removal of the section of sidewalk along Riley Road from the project scope. NOW, THEREFORE, BE IT RESOLVED BY BEAUFORT COUNTY COUNCIL, in meeting duly assembled, establishes the redefined project scope for the Broad River Boulevard to remove the Riley Road Sidewalk project from the 2018 One Cent Transportation Sales Tax funds. Adopted this ____ day of __________, 2026. COUNTY COUNCIL OF BEAUFORT COUNTY BY: Alice Howard, Chairman ATTEST: _____ Sarah W. Brock, Clerk to Council Page 142 of 194 Beaufort County conducted an in-person Public Meeting on August 18, 2026, in conjunction with a Virtual Public Meeting from August 4, 2026, through September 2, 2026, for the proposed Broad River Boulevard and Riley Road Sidewalk project. The following is a summary of the project with exhibits shown at the public meeting and published on the website. The project is a proposed 6′ sidewalk on Broad River Boulevard from Broad River Elementary School to Riley Road and on Riley Road from Broad River Boulevard to Fair Road. This sidewalk is approximately 0.7 5 miles long and will improve pedestrian safety by providing a separate facility from the roadway. Broad River Boulevard is a SCDOT-owned and maintained roadway with a variable present right of way and Riley Road is a County-owned and maintained roadway with a variable present right of way. It is anticipated the sidewalk will remain within the present right of way where possible, but new right of way will be required. Meeting Summary: Time Period: • Public Meeting: August 18, 2026, from 5-7 pm at the Broad River Elementary School, 474 Broad River Boulevard, SC – An informal, drop-in format meeting hosted by Beaufort County Engineering along with representatives from J. Bragg Consulting, Inc. and Infrastructure Consulting and Engineering, Inc. Citizens were provided an opportunity to review the exhibits and have a one -on-one question/answer session with project representatives. There were 12 attendees. • Virtual Public Meeting: August 4 , 2026, through September 2 , 2026 – 30-day virtual meeting hosted on www.BeaufortCountyPenny.com Advertisements: • E-mail advertisement on August 13, 2026, and County Administrator Weekly Update on August 15, 2026 • 7 “Yard” Signs total were placed on August 6, 2026 • County Public Meetings Calendar: https://www.beaufortcountysc.gov/calendar.html Public Comments: 13 total comments were received by submitting the comment form during the public meeting or by an online comment form, mail, e-mail, and hand delivery. Comments with a valid mailing address will receive a mailed response. The following is a summary of comments received: • 10 comments were submitted at the Public Meeting. • 3 comments were submitted through the online comment form On the Comment Form, they were asked if they were “In Favor Of” the project by answering “Yes” or “No”, if they lived near the proposed project “Yes” or “No”, and if they would utilize the proposed sidewalk “Yes or “No.” This is a summary of those who responded to the questions: BROAD RIVER BLVD & RILEY RD SIDEWALK SUMMARY & RECOMMENDATION Page 143 of 194 Page 2 Sidewalk “In Favor Of” “Lives Near” “Would Utilize” Yes No Yes No Yes No 6’ Broad River Boulevard & Riley Road Sidewalk 4 8 12 1 4 8 The above chart represent s 12 commentor’s responses which were submitted. 1 commentor did not answer the above questions and another commentor only provided a response to “lives near”. They were also provided with the opportunity to submit a written comment. 13 commentors provided a written comment. Several commentors may have been in favor of the project if it did not include a sidewalk on Riley Road. The residents of Riley Road are not in favor of constructing the sidewalk on Riley Road. Recommendation: Based on the comments received from the meeting, it is recommended that the County proceed with the following: • Construction of a new 6’ sidewalk only on Broad River Boulevard from Broad River Boulevard Elementary School to Riley Road • Remove the sidewalk on Riley Road from the project and do not construct Comment Summary: Note: Comments are copied as is with no edits. I own land located at 29 Riley Rd (2 lots). My son and family has a house and reside on the property at 29 Riley Rd. If the project starts, 29 Riley Rd would need an established driveway placed on lot 34, where the current mail box for 29 Riley Rd exist. Yes we would use it on broad river blvd. We would not on Riley rd. We don't believe it's needed on Riley rd. The setback on Riley rd and removal of trees etc to complete the project is unfair to the people on that road. It would be better to extend the walkway the other direction to castle rock. wife most days picks up the trash on broad river blvd from Joe Fraser to Donaldson camp rd. The side walk on broad river to Joe Frazier is to close to the road. At least from Riley rd to castle rock rd. It would be better for everyone. Please leave Riley rd alone. We believe the sidewalk should extend to the intersection of Broad River Blvd & Castle Rock Rd. This is a ridiculous waste of taxpayers money. Nobody walks down this road. All kids that are dropped off by the school bus are picked up by their parents. There is never anyone walking on Riley or Fair Road. It makes no sense to add a sidewalk that doesn't get use. It will be a waste of money to put it in. There also isn't a drainage problem even though that was said as well. I have lived @ my address for 34 years. 1. The road, Riley Rd, is too dangerous for pedestrians. 2. We built a fence to protect our family from careless drivers. 3. Can we monitor Riley Rd to evaluate how many people walk down our road? If you notice anyone, please let us know. 4. In a nutshell. This is a waste of money! If it would help the neighborhood, then I we be all for it. It simply defies logic! Waste of taxpayers money. We see no use for it. No one walks on Riley Rd. We have not seen drainage problems. A few kids meet bus at Broad River. We need speed bumps for drivers. We suggest using money in front of school for turn lane. We take care of our yard & keep it where someone could walk in grass. We need speed bumps not a sidewalk. Page 144 of 194 Page 3 I am in favor of a more walkable Beaufort County. I'm not sure how to feel about it. I really don't approve of the sidewalk. It's not serving me any purpose and you are taking property away from us to benefit someone else. It is not right. Bringing in a sidewalk is not good. I strongly go against it. My drainfield is near my mailbox. My land is too low. My fence is not to be removed, you will cause property damage, you will cause septic and drainfield damage. You will cause hardship to my family. We lived there over 60 years now. You want to take away our land and heritage. the oak tree is a part of our family and value and cannot be removed. Wd don't need your sidewalk. Go away!! Why Riley Road? Better Castle Road Rd to Riley Rd. Considered Castle Rock to 170. There is a big soccer field on Castle Rock and Colonial Heights has a lot of school age children. Continually adding impervious surfaces exacerbates an ongoing stormwater problem. If there has been a strong need for this sidewalk because of public safety and citizens requests for this sidewalk, please consider using pervious materials. Cost and maintenance would most likely outweigh the negative impacts of overstressing an already problematic stormwater issue, considering the amount of growth that is possible in this area. I feel the Broad River Boulevard & Riley Road Sidewalk project represents a questionable use of the limited transportation tax dollars. It dedicates over a million to constructing a sidewalk serving a relatively small residential area. While pedestrian safety is an important objective, we should focus on whether this project provides sufficient public benefit compared to other transportation needs such as reducing traffic congestion, improving major intersections, repairing deteriorating roads, or addressing countywide infrastructure deficiencies. The project's estimated cost has increased from approximately $1.19 million to $1.49 million, an increase of more than 25%, before construction has even begun, and years after if was approved in the 2018 sales tax referendum. These delays and cost increases raise questions about whether we are maximizing the value of available funds, for many residents who will never use this sidewalk. The return on investment appears limited when compared with projects that would benefit tens of thousands of daily drivers or address more pressing transportation challenges. Page 145 of 194 BEAUFORT COUNTY PUBLIC FACILITIES COMMITTEE AGENDA ITEM SUMMARY ITEM TITLE: APPROVAL OF A CONTRACT TO PHILLIPS PAVING COMPANY FOR THE STUART POINT PATHWAY PROJECT ($1,978,701.50) - CONTINGENT UPON FINAL SC. DEPT OF COMMERCE APPROVAL MEETING NAME AND DATE: Public Facilities Committee November 16, 2026 STAFF RECOMMENDATION / COUNCIL OPTIONS: Staff recommends approval to allocate a total project budget of $1,978,701.50 including contingency amount. (Pending SC Dept. of Commerce Approval) PRESENTER INFORMATION: Bryan Bauer, PE - Director of Engineering (5 min) ITEM BACKGROUND: This project is part of the 2018 Sales Tax Program and is governed by an intergovernmental agreement between SCDOT and Beaufort County. This project has been approved by the US Department of Commerce for receipt of a $200,000 Community Development Block Grant, to be applied to a portion of the total project costs. The award, and therefore commencement of construction of the project as bid, is subject to full final approval by the Commerce Department, contingent upon finding of an acceptable bid amount and bid process. On September 16, 2026, Beaufort County published an invitation to bid for the project scope. Four bids were received by the deadline of October 22, 2026, and determined to be fair and reasonable, and within expected project cost estimates. We are seeking PFC and County Counsel approvals at this time, with a final required approval to be issued by the US Department of Commerce for the community block grant. FISCAL IMPACT: • Contract fee for materials and construction: $1,798,819.50 • Recommended contingency (10%): $179,882.00 • Total expected project budget: $1,978,701.50 • Funding source: Account No. 4705-80-0000-54500 • Balance of funding account: $17,170,887.18 • Community Block Grant funds: $200,000.00 APPROVAL HISTORY: Page 146 of 194 Counsel approved design and plan preparation work in 2024. Page 147 of 194 Beaufort County, SC Engineering Bryan Bauer, Director PO Box 1228, Beaufort, SC 29902 EVALUATION TABULATION IFB No. IFB 102226 S-70 Stuart Point Road Sidewalk RESPONSE DEADLINE: October 22, 2026 at 3:00 pm Report Generated: Friday, October 30, 2026 SELECTED VENDOR TOTALS Vendor Total Phillips Paving Co. $1,798,819.25 KTC Enterprises $2,477,923.64 Site-Prep Inc of NC $2,890,563.64 APAC Atlantic, Inc. $3,390,840.86 S-70 STUART POINT ROAD SIDEWALK BID SHEET S-70 Stuart Point Road Sidewalk Bid Sheet APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC Selected Line Item Description Quantity Unit of Measure Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total X 1031000 MOBILIZATION 1 LS $195,000.00 $195,000.00 $142,000.00 $142,000.00 $229,790.00 $229,790.00 $148,100.00 $148,100.00 X 1032010 BONDS AND INSURANCE 1 LS $60,000.00 $60,000.00 $72,020.05 $72,020.05 $25,300.00 $25,300.00 $55,000.00 $55,000.00 X 1050800 CONSTRUCTION STAKES, LINES & GRADES 1 EA $60,000.00 $60,000.00 $99,000.00 $99,000.00 $19,250.00 $19,250.00 $15,640.00 $15,640.00 X 2012000 CLEARING & GRUBBING WITHIN ROADWAY 1 LS $400,000.00 $400,000.00 $92,000.00 $92,000.00 $50,000.00 $50,000.00 $193,500.00 $193,500.00 Page 148 of 194 EVALUATION TABULATION IFB No. IFB 102226 S-70 Stuart Point Road Sidewalk EVALUATION TABULATION Invitation For Bid - S-70 Stuart Point Road Sidewalk Page 2 S-70 Stuart Point Road Sidewalk Bid Sheet APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC Selected Line Item Description Quantity Unit of Measure Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total X 2025000 REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 50 SY $125.00 $6,250.00 $50.00 $2,500.00 $90.00 $4,500.00 $37.00 $1,850.00 X 2031000 UNCLASSIFIED EXCAVATION 4930 CY $53.00 $261,290.00 $28.00 $138,040.00 $17.75 $87,507.50 $51.83 $255,521.90 X 2033000 BORROW EXCAVATION 7932 CY $63.00 $499,716.00 $35.26 $279,682.32 $28.00 $222,096.00 $50.09 $397,313.88 X 2034000 MUCK EXCAVATION 500 CY $94.00 $47,000.00 $27.00 $13,500.00 $39.50 $19,750.00 $80.92 $40,460.00 X 3050106 GRADED AGGREGATE BASE COURSE (6" UNIFORM) 55 SY $205.00 $11,275.00 $90.00 $4,950.00 $42.00 $2,310.00 $84.05 $4,622.75 X 3050108 GRADED AGGREGATE BASE COURSE (8" UNIFORM) 420 SY $140.00 $58,800.00 $45.25 $19,005.00 $46.00 $19,320.00 $71.87 $30,185.40 X 3059900 MAINTENANCE STONE 338 TON $200.00 $67,600.00 $75.00 $25,350.00 $75.00 $25,350.00 $112.00 $37,856.00 X 4011004 LIQUID ASPHALT BINDER PG64-22 20 TON $700.00 $14,000.00 $767.00 $15,340.00 $895.80 $17,916.00 $887.64 $17,752.80 X 4040340 ASPHALT SURFACE COURSE TYPE C 44 TON $375.00 $16,500.00 $361.11 $15,888.84 $225.50 $9,922.00 $223.45 $9,831.80 Page 149 of 194 EVALUATION TABULATION IFB No. IFB 102226 S-70 Stuart Point Road Sidewalk EVALUATION TABULATION Invitation For Bid - S-70 Stuart Point Road Sidewalk Page 3 S-70 Stuart Point Road Sidewalk Bid Sheet APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC Selected Line Item Description Quantity Unit of Measure Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total X 4040350 ASPHALT SURFACE COURSE TYPE D 288 TON $355.00 $102,240.00 $361.11 $103,999.68 $165.00 $47,520.00 $163.50 $47,088.00 X 6011000 TRAFFIC CONTROL 1 LS $400,000.00 $400,000.00 $235,000.00 $235,000.00 $71,125.00 $71,125.00 $223,415.00 $223,415.00 X 6051120 PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 288 SF $15.00 $4,320.00 $32.10 $9,244.80 $16.00 $4,608.00 $6.60 $1,900.80 X 6271015 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 704 LF $2.80 $1,971.20 $9.60 $6,758.40 $5.00 $3,520.00 $10.90 $7,673.60 X 6271025 24" WHITE SOLID LINES (STOP/DIAG LINES)- THERMO.-125 MIL 140 LF $12.75 $1,785.00 $14.00 $1,960.00 $20.00 $2,800.00 $10.90 $1,526.00 X 7143615 15" SMOOTH WALL PIPE 984 LF $110.00 $108,240.00 $142.00 $139,728.00 $68.65 $67,551.60 $186.30 $183,319.20 X 7143618 18" SMOOTH WALL PIPE 608 LF $115.00 $69,920.00 $152.00 $92,416.00 $82.30 $50,038.40 $198.25 $120,536.00 X 7149999 CLEANING EXISTING PIPE 310 LF $25.00 $7,750.00 $60.00 $18,600.00 $25.00 $7,750.00 $27.25 $8,447.50 X 7192010 DROP INLET (24" X 24") 15 EA $6,250.00 $93,750.00 $4,400.00 $66,000.00 $6,292.00 $94,380.00 $5,380.00 $80,700.00 Page 150 of 194 EVALUATION TABULATION IFB No. IFB 102226 S-70 Stuart Point Road Sidewalk EVALUATION TABULATION Invitation For Bid - S-70 Stuart Point Road Sidewalk Page 4 S-70 Stuart Point Road Sidewalk Bid Sheet APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC Selected Line Item Description Quantity Unit of Measure Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total X 7197052 CONCRETE COLLAR FOR UP TO 24" PIPE 3 EA $5,000.00 $15,000.00 $5,400.00 $16,200.00 $4,155.00 $12,465.00 $3,785.00 $11,355.00 X 7204100 CONCRETE SIDEWALK(4" UNIFORM) 8429 SY $77.00 $649,033.00 $70.95 $598,037.55 $54.00 $455,166.00 $89.40 $753,552.60 X 7204900 DETECTABLE WARNING MATERIAL 492 SF $51.00 $25,092.00 $85.00 $41,820.00 $40.00 $19,680.00 $54.50 $26,814.00 X 7209000 PEDESTRIAN RAMP CONSTRUCTION 353 SY $126.00 $44,478.00 $12.80 $4,518.40 $115.00 $40,595.00 $119.36 $42,134.08 X 8041020 RIP-RAP (CLASS B) 24 TON $385.00 $9,240.00 $375.00 $9,000.00 $100.00 $2,400.00 $178.00 $4,272.00 X 8048205 GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B 33 SY $32.00 $1,056.00 $15.00 $495.00 $8.00 $264.00 $30.00 $990.00 X 8068301 TEMPORARY BARRIER FENCE (ORANGE) 1481 LF $3.40 $5,035.40 $9.00 $13,329.00 $2.25 $3,332.25 $2.62 $3,880.22 X 8071000 RESET FENCE 323 LF $35.50 $11,466.50 $37.00 $11,951.00 $15.00 $4,845.00 $51.16 $16,524.68 X 8072000 RESET CHAIN- LINK FENCE 1381 LF $30.00 $41,430.00 $34.00 $46,954.00 $31.00 $42,811.00 $43.60 $60,211.60 Page 151 of 194 EVALUATION TABULATION IFB No. IFB 102226 S-70 Stuart Point Road Sidewalk EVALUATION TABULATION Invitation For Bid - S-70 Stuart Point Road Sidewalk Page 5 S-70 Stuart Point Road Sidewalk Bid Sheet APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC Selected Line Item Description Quantity Unit of Measure Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total X 8091010 RIGHT OF WAY MARKER(REBAR AND CAP) 89 EA $250.00 $22,250.00 $200.00 $17,800.00 $275.00 $24,475.00 $60.00 $5,340.00 X 8091050 RIGHT OF WAY PLAT 1 LS $10,000.00 $10,000.00 $8,500.00 $8,500.00 $25,000.00 $25,000.00 $5,175.00 $5,175.00 X 8100100 PERMANENT COVER 3.59 ACRE $1,416.00 $5,083.44 $1,000.00 $3,590.00 $2,035.00 $7,305.65 $1,543.00 $5,539.37 X 8100200 TEMPORARY COVER 3.59 ACRE $933.00 $3,349.47 $1,000.00 $3,590.00 $1,375.00 $4,936.25 $1,016.00 $3,647.44 X 8104005 FERTILIZER (NITROGEN) 359 LB $1.26 $452.34 $0.12 $43.08 $2.50 $897.50 $1.37 $491.83 X 8104010 FERTILIZER (PHOSPHORIC ACID) 359 LB $1.26 $452.34 $0.12 $43.08 $2.50 $897.50 $1.37 $491.83 X 8104015 FERTILIZER (POTASH) 359 LB $1.26 $452.34 $0.12 $43.08 $2.50 $897.50 $1.37 $491.83 X 8105005 AGRICULTURAL GRANULAR LIME 7183 LB $1.15 $8,260.45 $0.20 $1,436.60 $1.00 $7,183.00 $1.25 $8,978.75 X 8109050 SELECTIVE WATERING 54300 GAL $0.01 $543.00 $0.32 $17,376.00 $0.10 $5,430.00 $0.14 $7,602.00 X 8109901 MOWING 14.37 ACRE $452.00 $6,495.24 $308.00 $4,425.96 $550.00 $7,903.50 $493.00 $7,084.41 X 8151203 HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 1.59 ACRE $2,995.00 $4,762.05 $2,200.00 $3,498.00 $4,180.00 $6,646.20 $3,265.00 $5,191.35 Page 152 of 194 EVALUATION TABULATION IFB No. IFB 102226 S-70 Stuart Point Road Sidewalk EVALUATION TABULATION Invitation For Bid - S-70 Stuart Point Road Sidewalk Page 6 S-70 Stuart Point Road Sidewalk Bid Sheet APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC Selected Line Item Description Quantity Unit of Measure Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost Total X 8152007 SEDIMENT TUBES FOR DITCH CHECKS 1300 LF $11.26 $14,638.00 $35.00 $45,500.00 $14.30 $18,590.00 $12.27 $15,951.00 X 8153000 SILT FENCE 4133 LF $4.50 $18,598.50 $7.05 $29,137.65 $3.00 $12,399.00 $3.82 $15,788.06 X 8153090 REPLACE/REPAIR SILT FENCE 413 LF $3.78 $1,561.14 $7.05 $2,911.65 $4.25 $1,755.25 $4.12 $1,701.56 X 8154050 REMOVAL OF SILT RETAINED BY SILT FENCE 1033 LF $1.65 $1,704.45 $3.50 $3,615.50 $4.55 $4,700.15 $1.80 $1,859.40 X 8156210 INLET STRUCTURE FILTER - TYPE B 15 EA $200.00 $3,000.00 $75.00 $1,125.00 $396.00 $5,940.00 $217.00 $3,255.00 Total $3,390,840.86 $2,477,923.64 $1,798,819.25 $2,890,563.64 VENDOR QUESTIONNAIRE PASS/FAIL Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC Certification Pass Pass Pass Pass Contact information of authorized representative? Pass Pass Pass Pass Please Provide Licenses and Certificate of Insurance Pass Pass Pass Pass 100% Labor and Material Payment Bond Pass Pass Pass Pass Bidder Confirmation Pass Pass Pass Pass Communications Pass Pass Pass Pass Page 153 of 194 EVALUATION TABULATION IFB No. IFB 102226 S-70 Stuart Point Road Sidewalk EVALUATION TABULATION Invitation For Bid - S-70 Stuart Point Road Sidewalk Page 7 Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC Are you submitting this bid as a local vendor? Pass Pass Pass Pass Local Vendor Preference - Participation Affidavit No Response No Response No Response No Response Non-Collusion Affidavit of Prime Bidder Pass Pass Pass Pass Will you be using subcontractors? Pass Pass Pass Pass Non-Collusion Affidavit of Subcontractor Pass No Response No Response Pass Certification By Contractor Regarding Non-Segregated Facilities Pass Pass Pass Pass Business Organization Type of Business Organization: Pass Pass Pass Pass If you selected "Other" for your type of business, please explain: Pass Pass Pass Pass If applicable, please provide name of partners and additional information below: Pass Pass Pass Pass If your agency is a Corporation: Pass Pass Pass Pass Are you a Subchapter S Corporation? Pass Pass Pass Pass Please provide Subchapter S Shareholders: No Response Pass Pass Pass Page 154 of 194 EVALUATION TABULATION IFB No. IFB 102226 S-70 Stuart Point Road Sidewalk EVALUATION TABULATION Invitation For Bid - S-70 Stuart Point Road Sidewalk Page 8 Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC If individually owned: Pass Pass Pass Pass Have you ever operated under another name? Pass Pass Pass Pass Please provide all other business names and addresses of principal place of business for each business: Pass No Response No Response No Response Bonding Bid Bond Pass Pass Pass Pass Please provide the Bonding information: Pass Pass Pass Pass Do you intend to use any alternative form of security Pass Pass Pass Pass Indicate the form of security you intend to use and the name, address, point of contact, and telephone number of the banks, savings and loan, or surety you intend to use. (NOTE: Prequalification will not assure acceptance of any form of security.) No Response No Response No Response No Response Have any Performance or Payment Bond claims ever been paid by any surety on behalf of your organization? Pass Pass Pass Pass Page 155 of 194 EVALUATION TABULATION IFB No. IFB 102226 S-70 Stuart Point Road Sidewalk EVALUATION TABULATION Invitation For Bid - S-70 Stuart Point Road Sidewalk Page 9 Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC State the name of the project(s); the date; the name, address, telephone number, and contact person for the claimant; the surety satisfying the claim; the size of the claim; and the circumstances giving rise to the claim. No Response No Response No Response No Response Have you ever arbitrated or litigated a claim with an Owner, Architect, or Engineer in the last five years? Pass Pass Pass Pass State the name of the project(s); the date; the name, address, telephone number, and contact person for the claimant; the surety satisfying the claim; the size of the claim; and the circumstances giving rise to the claim. (Provide attachments if necessary.) No Response No Response No Response No Response Have you or any officer, partner, or owner of your organization, in any state or territory of the United States, or with respect to any agency of the Federal government: Page 156 of 194 EVALUATION TABULATION IFB No. IFB 102226 S-70 Stuart Point Road Sidewalk EVALUATION TABULATION Invitation For Bid - S-70 Stuart Point Road Sidewalk Page 10 Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC In the last in the last five years, received any fines or citations for building code violations which were unrelated to design? Pass Pass Pass Pass Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response No Response No Response No Response Ever been found to be guilty of charges relating to conflicts of interest: Pass Pass Pass Pass Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response No Response No Response No Response Ever been convicted on charges related to any criminal activity relating to construction means, methods, or techniques; bidding or bid rigging; or bribery? Pass Pass Pass Pass Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response No Response No Response No Response In the last five years, been found guilty of any minority contracting law violations? Pass Pass Pass Pass Page 157 of 194 EVALUATION TABULATION IFB No. IFB 102226 S-70 Stuart Point Road Sidewalk EVALUATION TABULATION Invitation For Bid - S-70 Stuart Point Road Sidewalk Page 11 Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response No Response No Response No Response In the last five years, pleaded no contest in any criminal proceeding related to contracting? Pass Pass Pass Pass Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response No Response No Response No Response Ever been disbarred from doing Federal, state, or local government work for any reason? Pass Pass Pass Pass Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response No Response No Response No Response Ever been terminated on a contract due to your default? Pass Pass Pass Pass Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response No Response No Response No Response In the last five years, paid liquidated damages for being late on a project? Pass Pass Pass Pass Page 158 of 194 EVALUATION TABULATION IFB No. IFB 102226 S-70 Stuart Point Road Sidewalk EVALUATION TABULATION Invitation For Bid - S-70 Stuart Point Road Sidewalk Page 12 Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response No Response No Response No Response In the last five years, been subject to tax collection proceedings? Pass Pass Pass Pass Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response No Response No Response No Response In the last seven years, filed for bankruptcy? Pass Pass Pass Pass Provide the name, address, telephone number, contact person, and circumstances relating to the question. No Response No Response No Response No Response Under what chapter of bankruptcy did you file? No Response No Response No Response No Response If you filed under Chapter 11 Reorganization, how long did you operate under this status? No Response No Response No Response No Response Are you operating under Chapter 11 status now? No Response No Response No Response No Response Safety Page 159 of 194 EVALUATION TABULATION IFB No. IFB 102226 S-70 Stuart Point Road Sidewalk EVALUATION TABULATION Invitation For Bid - S-70 Stuart Point Road Sidewalk Page 13 Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC Have you, in the last three years, been cited for willful violations for failure to abate, or for repeated violations, by the United States Occupational Safety and Health Administration or by the South Carolina Occupational Safety and Health Administration or by any other governmental body? Pass Pass Pass Pass State date, name, address, telephone number, and contact person for agency issuing citation and the nature of the violation. Also, advise the amount of fines paid, if any. Provide attachments if necessary. No Response No Response No Response No Response List your worker’s compensation experience modifier for the last three years. No Response No Response No Response No Response References Page 160 of 194 EVALUATION TABULATION IFB No. IFB 102226 S-70 Stuart Point Road Sidewalk EVALUATION TABULATION Invitation For Bid - S-70 Stuart Point Road Sidewalk Page 14 Question Title APAC Atlantic, Inc. KTC Enterprises Phillips Paving Co. Site-Prep Inc of NC Provide at least two references from each industry group listed. Provide other references as requested. Provide current names, addresses, telephone numbers, and contacts. Pass Pass Pass Pass Certification regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion: The contractor certifies: Pass Pass Pass Pass Explain fully if it has been involved in any litigation involving performance. No Response Pass No Response No Response Small and Minority Business Participation Program Are you a Small or Minority Business ? Pass Pass Pass Pass Upload your Small/Minority Documentation No Response Pass No Response No Response Are you self-performing 100%? Pass Pass Pass Pass

Text truncated. Open the original for the full document.

Source: Beaufort County website. First collected Nov 8, 2026.